WorldWideScience

Sample records for mcnary dam 1987-1988

  1. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

    1989-09-01

    We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

  2. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  3. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  4. Assessing survival of Mid-Columbia River released juvenile salmonids at McNary Dam, Washington, 2008-09

    Science.gov (United States)

    Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.

    2010-01-01

    Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because

  5. Evaluation of factors affecting collection efficiency estimates of chinook salmon and steelhead smolts at McNary Dam, 1989. Final report

    International Nuclear Information System (INIS)

    Stuehrenberg, L.; Smith, D.; Johnson, O.W.

    1995-10-01

    Populations of salmonid smolts migrating through the hydropower system on the Columbia River incur some rate of mortality at each dam. To set priorities on options to minimize losses and provide safe passage of the smolts at dams, estimates of smolt survival at each dam are necessary. Two methods have been developed to obtain these survival estimates: the direct and the indirect method. With the indirect method, a test group of fish is released upstream and a-control group is released downstream from the area of interest. With the direct method, a single release of fish above the area of interest is used, with subsequent recovery below the area of interest. In 1988, the National Marine Fisheries Service (NMFS) began a 2-year study at McNary Dam to address possible sources of variation associated with the direct method of obtaining survival estimates. Five study objectives were established to determine whether (1) fish from the Columbia and Snake Rivers mixed as they migrated to McNary Dam (release-location tests); (2) collection rates for Columbia and Snake River stocks were the same (river-of-origin tests); (3) test-group release timing influenced recovery rates (time-of-release tests); (4) a collection-rate bias existed from use of test fish previously guided and collected at the recovery site (tests of previously guided fish); and (5) recovery rates obtained with PIT-tagged fish were comparable to those previously obtained with freeze-branded fish (PIT-tag vs. freeze-brand technology)

  6. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  7. Columbia River Salmonid Outmigration: McNary Dam Passage and Enhanced Smolt Quality, 1984 Second Year Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl B.

    1984-07-01

    The effects of the McNary Dam transportation system on emigrating fall and spring chinook smolts were evaluated using physiological indices of stress (e.g., plasma cortisol, hepatic glycogen, leucocrit, interrenal cell nuclear diameter) and performance tests (e.g., saltwater challenge, secondary stress challenge, disease resistance). Controlled experiments were conducted in a hatchery environment to characterize the fishes' physiological responses to stress, and disease resistance to allow a basis for judging the nature of the stress experienced by smolts at McNary Dam. 55 figs., 3 tabs.

  8. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  9. A Markov chain analysis of the movements of juvenile salmonids, including sockeye salmon, in the forebay of McNary Dam, Washington and Oregon, 2006-09

    Science.gov (United States)

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the valuable information collected at McNary Dam was in the form of three-dimensional (hereafter referred to as 3-D) tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and testing of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting 3-D results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we used a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis allowed us to numerically summarize the behavior of fish in the forebay. This report is the second report published in 2012 that uses this analytical method. The first report included only fish released as part of the annual studies conducted at McNary Dam. This second report includes sockeye salmon that were released as part of studies conducted by the Chelan and Grant County Public Utility Districts at mid-Columbia River dams. The studies conducted in the mid-Columbia used the same transmitters as were used for McNary Dam studies, but transmitter pulse width was different between studies. Additionally, no passive integrated transponder tags were implanted in sockeye salmon. Differences in transmitter pulse width resulted in lower detection probabilities for sockeye salmon at McNary Dam. The absence of passive integrated transponder tags prevented us from determining if fish passed the powerhouse through the juvenile bypass system (JBS) or turbines. To

  10. Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batton, George [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ingraham, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xi [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wagner, Katie A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-23

    The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  11. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam: Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1997-1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    1999-02-01

    The authors report on their progress from April 1997 through March 1998 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), National Marine Fisheries Service (NMFS; Report D), U.S. Fish and Wildlife Service (USFWS; Report E), and Columbia River Inter-Tribal Fish Commission (CRITFC; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of the work from April 1997 through March 1998 listed.

  12. Effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and status and habitat requirements of white sturgeon populations in the Columbia and Snake Rivers upstream from McNary Dam

    International Nuclear Information System (INIS)

    Beamesderfer, R.C.; Nigro, A.A.

    1993-12-01

    This report details activities during the first year of Phase II of this sturgeon research. In Phase I, the authors assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The status and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, US Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparation for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report

  13. Progress report 1987-1988. Reactor Chemistry Department

    International Nuclear Information System (INIS)

    1988-01-01

    Review of the activities performed by the Reactor Chemistry Department of the National Atomic Energy Commission of Argentina during 1987-1988. This department provides services and assistance in all matters related to water chemistry and nuclear reactors chemistry, in all their phases: design, construction, commissioning and decommissioning. The appendix includes information on the Reactor Chemistry Department staff, its publications, services, seminars, courses and conferences performed during 1987-1988. (Author) [es

  14. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  15. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Volume 2: Supplemental papers and data documentation; Final report

    International Nuclear Information System (INIS)

    Beamesderfer, R.C.; Nigro, A.A.

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary

  16. Effects of Mitigation Measures on Productivity of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam, and Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesdorfer, Raymond C.; Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-12-01

    We report on our progress from April 1992-March 1993 in research on white sturgeon in the lower Columbia River. The study began in July 1986 and progress through 1992 was summarized in a comprehensive report in 2 volumes (Beamesderfer and Nigro 1993a, 1993b). This report details activities during the first year of Phase II of this sturgeon research. In Phase I, we assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The status and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, U.S. Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparations for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report.

  17. Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam Volume II; Supplemental Papers and Data Documentation, 1986-1992 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesderfer, Raymond C.; Nigro, Anthony A. [Oregon Dept. of Fish and Wildlife, Clackamas, OR (US)

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary.

  18. A multi-year analysis of spillway survival for juvenile salmonids as a function of spill bay operations at McNary Dam, Washington and Oregon, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.

    2012-01-01

    We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized

  19. Tropical impacts of SST forcing: A case study for 1987 versus 1988

    Science.gov (United States)

    Druyan, Leonard M.; Hastenrath, Stefan

    1994-01-01

    The response of the NASA/Goddard Institute for Space Studies general circulation model (GCM) to large tropical sea surface temperature (SST) anomalies is investigated by evaluating model simulations of the particularly contrasting summer monsoon seasons 1987 and 1988. These years are representative of the warm and cold phases, respectively, of a recent El Nino-Southern Oscillation (ENSO) event. An ensemble averaging the results of three simulations was considered for each season, using monthly mean observed SST anomalies for June-August 1987 and 1988 as lower boundary forcing. Consistent with the European Center for Medium Weather Forecast (ECMWF)-analyzed winds, the simulations based on 1988 as compared to 1987 SST exhibit stronger upper-tropospheric irrotational circulation between the monsoon regions and the Southern Hemispheric sub-tropical anticyclones, a stronger Pacific Walker cell and a weaker subtropical westerly jet over the South Pacific. In the same vein, the modeled precipitation, indicating a more northerly position of the Pacific Inter-Tropical Convergence Zone (ITCZ) in 1988 compared with 1987, is supported by satellite observations of outgoing longwave radiation and highly reflective clouds.

  20. Annual report 1987-1988

    International Nuclear Information System (INIS)

    1988-01-01

    This First Annual Report of the Safety Review Committee describes the Committee's operations for the year ending 30 June 1988. The Committee was established on 27 April 1987 in accordance with Section 26 of the Australian Nuclear Science and Technology Organisation (ANSTO) Act. The report provides an overview of ANSTO's Lucas Heights site, its facilities and resources and the potential of its operations for off-site consequences. The safety of the HIFAR and MOATA reactors, the HIFAR refurbishing program, the management of radioactive wastes, and occupational health and safety are discussed as well as the regulatory environment in which ANSTO operates

  1. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  2. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  3. Solar-Geophysical Data Number 525, May 1988. Part 2 (comprehensive reports). Data for November 1987, and miscellanea

    International Nuclear Information System (INIS)

    Coffey, H.E.

    1988-05-01

    Contents include: detailed index for 1987 and 1988; data for November 1987 -- (Meudon carte synoptique, solar flares, solar radio bursts at fixed frequencies, solar x-ray radiation from GOES satellite, mass ejections from the sun, active prominences and filaments); miscellaneous data -- interplanetary solar particles and plasma -- (IMP 8 solar wind -- October 1987 - January 1988, IMP 8 solar particles -- September 1985 - May 1986)

  4. Radioactivity of foodstuffs in Finland in 1987-1988

    International Nuclear Information System (INIS)

    Rantavaara, A.

    1991-06-01

    Radiocesium and radiostrontium in foodstuffs of agricultural origin were surveyed in Finland in 1987 - 1988. The nationwide survey was a continuation to an earlier foodstuff monitoring programme, which was extended both areally and by the types of foodstuffs after the Chernobyl accident in 1986. The purpose of the programme was to give information for dose assessment and on temporal changes and regional differences in the contents of fallout radionuclides in foodstuffs

  5. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-03-01

    We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  6. White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2005-08-01

    We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  7. Search for TeV gamma rays from SN1987A during December 1987 and January 1988

    International Nuclear Information System (INIS)

    Bond, I.A.; Conway, M.J.; Budding, E.

    1988-04-01

    Very high energy γ rays from the supernova SN1987A were searched for at the Black Birch Range in New Zealand during December 1987 and January 1988. The total data obtained during 42 hours of observation time give an upper bound on the flux at 95 % confidence level of 6.1 x 10 -12 cm -2 s -1 for γ rays with energies larger than 3 TeV. Data obtained on January 14 and 15 are found to have excess counts, above the background level, corresponding to a flux of (1.9 ± 0.5) x 10 -11 cm -2 s -1 . The energy emitted in TeV γ rays, by attributing this excess to γ rays from SN1987A, is calculated ∼ 10 43 erg assuming that the duration of the excess was 2 ∼ 3 days. PACS numbers: 97.60.Bw, 95.85.Qx. (author)

  8. Main Ring bunch spreaders: Past, 1987/1988 fixed target run, and proposed future

    International Nuclear Information System (INIS)

    Jackson, G.P.

    1989-01-01

    During the last 1987--1988 fixed target running period beam intensity was limited many times by coherent instabilities in both the Main Ring and in the Tevatron. The intensity thresholds for instabilities are generally inversely proportional to the proton bunch length. Since fixed target operations are insensitive to the longitudinal phase space emittance of the beam, bunch spreaders are employed to increase this emittance, and hence the bunch length. As a result, more beam intensity can be delivered to the fixed target experiments. This paper starts with a short history behind the old Main Ring bunch spreader. After discussing the physics of stimulated emittance growth, the design and performance of the 1987--1988 fixed target run Main Ring bunch spreader is discussed. Finally, designs of improved Main Ring and Tevatron bunch spreaders for the next fixed target run are proposed. 23 figs

  9. Annual report on nuclear physics activities. July 1, 1987 - June 30, 1988

    International Nuclear Information System (INIS)

    Doll, P.; Meisel, G.

    1989-02-01

    This report surveys the activities in basic research from July 1, 1987 to June 30, 1988 at the Institute for Nuclear Physics (IK) of the Kernforschungszentrum Karlsruhe. The research program of this institute comprises nuclear astropysics, laser spectroscopy, nuclear reactions with light ions, neutron physics, neutrino physics and high energy physics, as well as detector technology. (orig.) [de

  10. Biennial activity report of metallurgy programme for 1987 and 1988

    International Nuclear Information System (INIS)

    Shanmugam, V.; Rao, B.P.C.; Bhanu Sankara Rao, K.; Muralidharan, P.; Bhaduri, A.K.; Kuppusami, P.; Shyamsunder, M.T.; Sampath, N.; Sreedharan, O.M.

    1990-01-01

    The research and development (R and D) activities in the field of metallurgy at Indira Gandhi Centre for Atomic Research, Kalpakkam during 1987-1988 are reported in the form of individual summaries arranged under headings : (1) Mechanical Metallurgy Section, (2) Physical Metallurgy Section, (3) Chemical Metallurgy Section, (4) Materials Technology Section, (5) Division for PIE and NDT Development and (6) Quality Engineering Section. A list of publications by the staff scientists working in the field of metallurgy during report period is given in one of the appendices. (author). figs., tabs

  11. Analyses of potential factors affecting survival of juvenile salmonids volitionally passing through turbines at McNary and John Day Dams, Columbia River

    Science.gov (United States)

    Beeman, John; Hansel, Hal; Perry, Russell; Hockersmith, Eric; Sandford, Ben

    2011-01-01

    This report describes analyses of data from radio- or acoustic-tagged juvenile salmonids passing through hydro-dam turbines to determine factors affecting fish survival. The data were collected during a series of studies designed to estimate passage and survival probabilities at McNary (2002-09) and John Day (2002-03) Dams on the Columbia River during controlled experiments of structures or operations at spillways. Relatively few tagged fish passed turbines in any single study, but sample sizes generally were adequate for our analyses when data were combined from studies using common methods over a series of years. We used information-theoretic methods to evaluate biological, operational, and group covariates by creating models fitting linear (all covariates) or curvilinear (operational covariates only) functions to the data. Biological covariates included tag burden, weight, and water temperature; operational covariates included spill percentage, total discharge, hydraulic head, and turbine unit discharge; and group covariates included year, treatment, and photoperiod. Several interactions between the variables also were considered. Support of covariates by the data was assessed by comparing the Akaike Information Criterion of competing models. The analyses were conducted because there was a lack of information about factors affecting survival of fish passing turbines volitionally and the data were available from past studies. The depth of acclimation, tag size relative to fish size (tag burden), turbine unit discharge, and area of entry into the turbine intake have been shown to affect turbine passage survival of juvenile salmonids in other studies. This study indicates that turbine passage survival of the study fish was primarily affected by biological covariates rather than operational covariates. A negative effect of tag burden was strongly supported in data from yearling Chinook salmon at John Day and McNary dams, but not for subyearling Chinook salmon or

  12. Reactor Engineering Department annual report (April 1, 1987 - March 31, 1988)

    International Nuclear Information System (INIS)

    1988-11-01

    This report summarizes the research and development activities in the Department of Reactor Engineering during the fiscal year of 1987 (April 1, 1987 - March 31, 1988). The major activities in the Department concerns the programs of the high temperature gas-cooled reactor, the high conversion light water reactor, the advanced fission reactor system and the fusion reactor at JAERI and the fast breeder reactor at PNC. The report contains the latest progress in nuclear data and group constants, theoretical methods and code development, reactor physics experiments and analyses, fusion neutronics, shielding, reactor and nuclear instrumentation, reactor control/diagnosis and robotics, as well as the new topics from this fiscal year on advanced reactors system design studies and technique developments related the facilities in the Department. Also described are the activities of the Research Committee on Reactor Physics. (author)

  13. The 1987-1988 progress report of the CEA-Euratom Association Research Laboratory

    International Nuclear Information System (INIS)

    1989-05-01

    The progress report of the CEA-Euratom Association Research Group, concerning 1987 and 1988 activities, is presented. The report involves the work carried out for assembling the Tore Supra system. The different components and the operating modes are described. The report includes: the Tore Supra construction and running, theoretical work, numerical calculations and results, the tritium technology, safety studies, supraconductors and bobbins. The Tore Supra contributions to the JET program are given [fr

  14. Studies in theoretical high energy particle physics: Technical progress report [February 1987-February 1988

    International Nuclear Information System (INIS)

    Sukhatme, U.P.; Keung, Wai-Yee; Kovacs, E.

    1988-02-01

    This is a technical progress report for grant No. FG02-84ER40173 for the period February 1987 to February 1988. Our research on supersymmetric quantum mechanics has yielded many interesting results. In particular, a systematic approach to the tunneling problem in double well potentials has been developed. Higgs boson related physics at the high energy hadron colliders has been extensively studied

  15. Annual report 1987-1988

    International Nuclear Information System (INIS)

    1988-01-01

    The paper presents: the annual report 1987/8 of the University Research Reactor, Risley, United Kingdom. The report contains a description of the current research programme using reactor produced isotopes and other reactor facilities. A summary of the work carried out by the Activation Analysis Service during 1987/8 is also given, along with the Reactor Teaching Programme, and the reactor operation and site safety arrangements. (U.K.)

  16. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Mallette, Christine [Oregon Department of Fish and Wildlife

    2009-07-28

    We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  17. Western Research Institute: Annual technical progress report, October 1987--September 1988

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    This report describes the technical progress made by the Western Research Institute of the University of Wyoming Research Institute of the University of Wyoming Research Corporation on work performed for the period October 1, 1987 through September 30, 1988. This research involves five resource areas: oil shale, tar sand, underground coal gasification, advanced process technology, and advanced fuels research. Under the terms of the cooperative agreement, an annual project plan has been approved by DOE. The work reported herein reflects the implementation of the research in the plan and follows the structure used therein. 49 refs., 32 figs., 87 tabs.

  18. Chemical Technology Division: Progress report, January 1, 1987--June 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This progress report summarizes the research and development efforts conducted in the Chemical Technology Division (Chem Tech) during the period January 1, 1987, to June 30, 1988. The following major areas are covered: waste management and environmental programs, radiochemical and reactor engineering programs, basic science and technology, Nuclear Regulatory Commission programs, and administrative resources and facilities. The Administrative Summary, an appendix, presents a comprehensive listing of publications, oral presentations, awards and recognitions, and patents of Chem Tech staff members during this period. A staffing level and financial summary and lists of seminars and Chem Tech consultants for the period are also included.

  19. Chemical Technology Division: Progress report, January 1, 1987--June 30, 1988

    International Nuclear Information System (INIS)

    1989-02-01

    This progress report summarizes the research and development efforts conducted in the Chemical Technology Division (Chem Tech) during the period January 1, 1987, to June 30, 1988. The following major areas are covered: waste management and environmental programs, radiochemical and reactor engineering programs, basic science and technology, Nuclear Regulatory Commission programs, and administrative resources and facilities. The Administrative Summary, an appendix, presents a comprehensive listing of publications, oral presentations, awards and recognitions, and patents of Chem Tech staff members during this period. A staffing level and financial summary and lists of seminars and Chem Tech consultants for the period are also included

  20. Central collisions of heavy ion physics: Supplemental annual report, October 1, 1987-March 31, 1988

    International Nuclear Information System (INIS)

    Fung, S.Y.

    1988-02-01

    This report briefly describes the activities of the Heavy Ion Physics Group at the University of California, Riverside in the six months from October 1, 1987 to March 31, 1988. During this period, our program continues to focus on correlation studies in central collisions at the Bevalac and AGS energies, and neutrino interactions and oscillation studies at LAMPF

  1. Geotechnical Field Data and Analysis Report, July 1987--June 1988

    International Nuclear Information System (INIS)

    1989-08-01

    The Geotechnical Field Data and Analysis Report (GFDAR) is prepared to provide a timely assessment of the geotechnical status of the Waste Isolation Pilot Plant (WIPP). During the period of shaft sinking and construction of the principal underground access and experimental areas, reporting was on a quarterly basis. Because excavation of the waste storage panels will take place more slowly and over an extended period, reporting in the coming years will be on an annual cycle. Data collected before June 30 of the year of the report will be presented and analyzed. This report presents and analyzes all data collected between July 31, 1987, and June 30, 1988. 3 refs., 410 figs., 30 tabs

  2. Radioactivity in foodstuffs 1988

    International Nuclear Information System (INIS)

    1989-01-01

    The average radioactivity dose level to which the Norwegian population was exposed through the ingestion of food in 1988 was between 0.10 and 0.15 mSv. This was about the same as in 1987. The radioactivity dose to which individuals with certain special dietary habits (large proportions of freshwater fish and reindeer meat in the diet) were exposed, was, however, up to three times higher in 1988 than in 1987. This was due firstly to the fact that reindeer meat which had been produced prior to the Chernobyl accident was no longer available, and secondly, to dietary advice not being followed as closely as before. The cost-benefit ratio of the measures introduced to reduce radioactivity levels in food, i.e. resources employed compared with the actual reduction in radioactivity levels achieved, has proved to be reasonably satisfactory, both in 1987 and 1988. Action levels and dietary advice remained unchanged in 1988. The present report summarizes results of analyses performed in 1988, and describes the measures introduced concerning various categorites of foods. Measures introduced were, as in 1987, primarily focused on the production of sheep meat (mutton/lamb) and on reindeer farming. 4 figs., 1 tab

  3. Scottish Universities Research and Reactor Centre annual report 1987-1988

    International Nuclear Information System (INIS)

    Whitley, J.E.

    1988-01-01

    The Scottish Universities Research and Reactor Centre (SURRC) provides facilities for research in isotopic, nuclear and earth sciences and collaborates with Scottish University departments on a wide range of research topics. One of its main areas of work is the Isotope Geology Unit. This has worked with the Nuclear Medicine Unit on the application of enriched stable isotope tracers in the biological and clinical sciences. The measurement of radioactive isomers is applied to quaternary geology, archaeology, nuclear medicine, health physics, oceanography, atomospheric sciences, environmental chemistry, nuclear waste disposal and mathematical modelling of the environment. There are also radiocarbon dating facilities. The facilities and the research undertaken at the Centre in the year 1987-1988, the Centre's twenty-fifth year are summarized in this report. (U.K.)

  4. Geotechnical Field Data and Analysis Report, July 1987--June 1988

    International Nuclear Information System (INIS)

    1989-08-01

    The Geotechnical Field Data and Analysis Report (GFDAR) is prepared to provide a timely assessment of the geotechnical status of the Waste Isolation Pilot Plant (WIPP). During the period of shaft sinking and construction of the principal underground access and experimental areas, reporting was on a quarterly basis. Because geotechnical responses of existing underground facilities have slowed to nearly steady-state and excavation of the waste storage panels will take place more slowly and over an extended period, reporting in the coming years will be on an annual cycle. Data collected before June 30 of the year of the report will be presented and analyzed. This report presents and analyzes all data collected between July 31, 1987, and June 30, 1988. 35 refs., 47 figs

  5. Testing of indoor radon-reduction techniques in central Ohio houses: Phase 1 (Winter 1987-1988). Report for October 1987-August 1988 (Final)

    International Nuclear Information System (INIS)

    Findlay, W.O.; Robertson, A.; Scott, A.G.

    1989-07-01

    The U.S. Environmental Protection Agency (EPA) has a program to demonstrate practical, cost-effective methods to reduce indoor radon concentrations in housing to 150 Bq/cu m (4 pCi/L) or less. The complete program will evaluate the full range of radon-reduction methods, i.e., house ventilation, sealing of entry routes, soil ventilation, radon removal from water, and air cleaning in the full range of housing substructure types and building styles, and geological conditions across the continental United States. The program described in the report demonstrated certain radon-reduction methods in housing and geology typical of southern Ohio in particular, and the central Great Plains States in general. The testing of radon-mitigation systems in Ohio houses is envisioned as taking place in two phases. The report describes Phase 1, which was carried out in 16 existing houses in the Dayton area during the 1987-1988 heating season

  6. Zooplankton biomass and production in the North Sea during the Autumn Circulation experiment, October 1987–March 1988

    DEFF Research Database (Denmark)

    Hay, S.J.; Kiørboe, Thomas; Matthews, A.

    1991-01-01

    Distribution and abundance of zooplankton in the North Sea during the Autumn Circulation Experiment (October 1987–March 1988) were examined. From shipboard egg production incubations and the distributions of eggs, nauplii and females, the productivity of various copepod species was described. Aga...

  7. Theoretical reversed field pinch studies: Progress report, August 31, 1987 to June 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This paper describes the progress made in Grant DE-FG02-85ER53212 since the end of the last year, August 31, 1987 to the present (June, 1988). Substantial results have emerged in two areas of high importance to the RFP program - nonlinear evolution with nonideal boundaries and self-consistent equilibrium in the presence of field errors. Both of these topics are critical for a basic understanding of RFP physics, for interpretation of current experiments, and for design of future devices and reactors. 3 refs

  8. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  9. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  10. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  11. Yucca Mountain Project: A summary of technical support activities, January 1987--June 1988

    International Nuclear Information System (INIS)

    1989-05-01

    This report is a summary of the technical support activities of Mifflin ampersand Associates, Inc., during the 18-month period beginning 01 January 1987 and ending on 30 June 1988. It covers the following topics: Vadose zone drilling site selection, permits and quality assurance (QA) procedures; climate change; geochemistry, mineralogy; disturbed zone; hydrogeology; and review of technical documents. The report is organized by generally discussing each topic from the following perspectives: issue(s), objective(s) of activity, finding(s), interpretation of finding(s), additional work needed, recommended program, and existing program

  12. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  13. Estabilidade constitucional e acordos constitucionais: os processos constituintes de Brasil (1987-1988 e Espanha (1977-1978 Constitutional stability and constitutional agreements: the constituent process of Brazil (1987-1988 and Spain (1977-1978

    Directory of Open Access Journals (Sweden)

    Antonio Gomes Moreira Maués

    2008-12-01

    Full Text Available O artigo analisa os acordos que formaram as maiorias nas assembléias constituintes de Brasil (1987-1988 e Espanha (1977-1978, buscando indentificar sua contribuição para a estabilidade constitucional dos dois países. O estudo foi desenvolvido em três níveis: estudo das normas regimentais das assembléias constituintes; tabulação das votações que aprovaram dispositivos constitucionais; e análise dos debates constitucionais, na qual foram identificados três processos de formação de maiorias, concessões mútuas, não-decisão e maioria aritmética. O trabalho demonstra que o uso de concessões mútuas e da não-decisão na constituinte favorece o processo de construção do consenso em torno da constituição, contribuindo para sua estabilidade.The article analyses the agreements which formed the majorities in the constituent assemblies of Brazil (1987-1988 and Spain (1977-1978, trying to identify its contribution to the constitutional stability in both countries. This analysis is developed through three steps: study of the rules that governed the constituent assemblies; organization of data about the votings which approved constitutional provisions; and analysis of the constitutional debates, in which three process of majority formation have been identified, mutual concessions; no-decision and arithmetical majority. The work shows that the use of mutual concessions and no-decision in the constituent assembly promotes the process of consensus building regarding the constitution, contributing to its stability.

  14. EL PESO DE LA MEMORIA EN LOS INICIOS DE LA TRANSICIÓN A LA DEMOCRACIA EN CHILE (1987-1988

    Directory of Open Access Journals (Sweden)

    CAROLINA GARCÍA GONZÁLEZ

    2006-12-01

    Full Text Available El artículo que se presenta a continuación analiza los primeros años de la transición chilena (1987-1988 desde la perspectiva de la memoria histórica, considerando la forma en que los recuerdos de lo que habían sido los gobiernos de Frei y de la Unidad popular, así como los del golpe de Estado y la dictadura, marcaron el desarrollo político y social durante el periodo señalado, es decir, el proceso plebiscitario de 1988. Para ello, se consideran las instancias que hicieron posible dicho proceso electoral, las campañas oficialistas y opositoras que se desarrollaron, y las razones que permiten explicar su resultado y considerarlo el punto de origen del proceso que permitió el retorno a la democracia en Chile, tras diecisiete años de dictaduraThe article that is shown analyze the firsts years of Chilean transition (1987-1988 from the perspective of the historic memory, considering the shape in that the remembers of had been the Frei and Popular Unity government, thus like the military State Stroke and the Dictatorship, signed the politic and social development in that period, specially, in the voting process of 1988. For that, we consider the instances that made that voting process possible, the developed pro-government officials and opponents campaigns, and the reasons that explain the results to consider it the process origin point that it allowed the return to the democracy in Chile, after 17 years of dictatorship

  15. Report for the coal type committee meetings in fiscal 1988; 1987 nendo tanshu iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The first committee meeting was held on September 30, 1987. The major agenda included: a development plan for the basic research, and as the summary of the achievements in fiscal 1986, Chinese coal liquefaction tests, coal type surveys, coal resource surveys, and as the research plan for fiscal 1987, coal resource surveys (Alaskan coal and Kalimantan coal), coal type surveys, and Chinese coal liquefaction tests. The results thereon were reported and deliberated. The second committee meeting was held on February 25, 1988. The agenda included: an interim report on the Chinese coal liquefaction tests, coal type surveys, coal resource surveys, (Alaskan coal and Kalimantan coal), as the interim report on the research achievements in fiscal 1987. Among the agenda, especially on the Chinese coal liquefaction tests, the data of the tests performed by the Chinese side and presented at the Japan-China joint technology sub-committee were introduced in detail, having drawn attention of the attendants. The first committee meeting reported the result of the autoclave test carried out by the Chinese side, the result of operation of the small continuous device (0.1 t/d) in fiscal 1986, and the result of the autoclave test performed by Mitsui Engineering and Shipbuilding for comparison. The second committee meeting reported the result of continuous operation implemented in China from August through September 1987 in the Chinese coal liquefaction test. (NEDO)

  16. Radioactivity levels in mushrooms collected in the area of Karlsruhe during 1987 and 1988

    International Nuclear Information System (INIS)

    Rueckert, G.; Diehl, J.F.; Heilgeist, M.

    1990-01-01

    Radioactive contamination of wild-growing mushrooms collected in the Northern Black Forest and neighbouring Rhine Valley area has been monitored since the Chernobyl reactor accident. Cs-134, Cs-137, Ag-110m and the natural nuclide K-40 were determined by gamma-spectrometry. Pooled data from all species and all locations showed a decrease in the radio-caesium levels from 1986 to 1988, both in mean values and maximum values. Samples of the same species collected at the same location exhibited large differences, although mixed samples rather than individual mushrooms were measured. Accumulation of caesium was observed particularly in Laccaria amethystina, Xerocomus badius, Xerocomus chrysenteron, Cantharellus tubaeformis, Laccaria laccata, and Russula ochroleuca, with maximum values of 3600 (1986), 2000 (1987), and 1200 (1988) Bq/kg of radio-caesium. A large number of species, among them Calocybe gambosa and Coprinus comatus, showed very small accumulations or no caesium. An accumulation of silver was found in Macrolepiota rhacodes and Agaricus arvensis, which contained a maximum of 11 Bq/kg Ag-110m. (orig.) [de

  17. Triennial technical report - 1986, 1987, 1988 - Instituto de Engenharia Nuclear (IEN) -Dept. of Reactors (DERE)

    International Nuclear Information System (INIS)

    1989-01-01

    The research activities developed during the period 1986, 1987 and 1988 by the Reactor Department of Brazilian Nuclear Energy Commission (CNEN-DERE) are summarized. The principal aim of the Department of Reactors is concerned to the study and development of fast reactors and research thermal reactors. The DERE also assists the CNEN in the areas related to analysis of power reactor structure; to teach Reactor Physics and Engineering at the University, and professional training to the Nuclear Engineering Institute. To develop its research activity the DERE has three big facilities: Argonauta reactor, CTS-1 sodium circuit, and water circuit. (M.I.)

  18. Nuclear Technology Programs semiannual progress report, October 1987--March 1988

    International Nuclear Information System (INIS)

    Harmon, J.E.

    1990-08-01

    This document reports on the work done by the Nuclear Technology Programs of the Chemical Technology Division, Argonne National Laboratory, in the period October 1987--March 1988. Work in applied physical chemistry included investigations into the processes that control the release and transport of fission products under accident-like conditions, the thermophysical properties of metal fuel and blanket materials of the Integral Fast Reactor, and the properties of selected materials in environments simulating those of fusion energy systems. In the area of separation science and technology, the bulk of the effort is concerned with developing and implementing processes for the removal and concentration of actinides from waste streams contaminated by transuranic elements. Another effort is concerned with examining the feasibility of substituting low-enriched for high-enriched uranium in the production of fission product 99 Mo. In the area of waste management, investigations are underway on the performance of materials in projected nuclear repository conditions to provide input to the licensing of the nation's high-level waste repositories

  19. A search for the millimetre lines of HCN in Comets Wilson 1987 VII and Machholz 1988 XV

    Science.gov (United States)

    Crouvisier, J.; Despois, D.; Bockelee-Morvan, D.; Gerard, E.; Paubert, G.; Johansson, L. E. B.; Ekelund, L.; Winnberg, A.; Ge, W.; Irvine, W. M.; Kinzel, W. M.; Schloerb, F. P.

    1990-08-01

    The J(1-0) lines of HCN at 89 GHz were searched for in Comet Wilson 1987 VII, with the FCRAO, the SEST and the IRAM radio telescopes between February and June 1987. There was no firm detection, but significant upper limits were obtained, which put severe constraints on the HCN production rate in that comet. A direct comparison with the observations of P/Halley suggests that the HCN abundance relative to water might be smaller in Comet Wilson by at least a factor of two. The J(1-0) and J(3-2) lines of HCN at 89 and 266 GHz were searched for in Comet Machholz 1988 XV when it was close to perihelion at 0.17 AU from the sun. There was no detection. At that moment, the comet was probably no longer active.

  20. Annual report 1987-1988

    International Nuclear Information System (INIS)

    1988-01-01

    For this thirtieth year of operation, the Institute's twenty constituent organisations were eighteen Australian universities, the Australian Nuclear Science and Technology Organisation (ANSTO) and the Commonwealth Scientific and Industrial Research Organisation (CSIRO). Through 1987-88, AINSE's operations supported research and training in the nuclear field, assisted the application of nuclear techniques in science, engineering and industrial technology, and assisted the universities and similar organisations in using the reactors, accelerators and other special facilities within the Lucas Heights Research Laboratories

  1. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  2. Spectroscopy Division progress report for January 1987 - December 1988

    International Nuclear Information System (INIS)

    Dixit, R.M.

    1989-01-01

    During the period January 1987 - December 1988, the Spectroscopy Division has carried out research and development in many areas of analytical spectroscopy, atomic spectra and spectra of diatomic and polyatomic molecules. The Division has acquired an ICP spectrometer and an excimer laser pumped dye laser during this period and they have been used very fruitfully for research and development. Research in high resolution atomic spectroscopy has continued to flourish. Beam foil spectroscopy and spectroscopy of low energy plasma focus sources have been put on a firm foundation. Setting up of new experimental systems for solid state spectral studies at liquid helium temperatures have been started. A good amount of theoretical work in forbidden transitions, has been carried out. Diode laser spectroscopy has been used for high precision intensity and frequency measurements. Service facilities like quality control analysis of nuclear materials and supply of optical components and thin film devices have performed with maximum efficiency. The electronics and instrumentation group has developed several facilities for various experimental set ups. Brief description of all these and other activities of the Division are given in the present progress report. A list of publications and a divisional staff chart are also given. (author). figs., tabs

  3. Cloud amount/frequency, ANIMALS - INDIVIDUAL and other data from AIRCRAFT in the Bering Sea from 1987-09-02 to 1988-10-20 (NODC Accession 9100026)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The aerial surveys of Whales data in this accession were collected from aircraft by Steve Tracey over the Bering Sea between September 1987 and October 1988 by Sea...

  4. Cloud amount/frequency, ANIMALS - INDIVIDUAL and other data from AIRCRAFT in the Chukchi Sea from 1987-09-01 to 1988-10-16 (NODC Accession 9100025)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The aerial surveys of Whales data in this accession were collected from aircraft by Don Llungblad over the Chukchi Sea between September 1987 and October 1988 by Sea...

  5. Postaccident changes in heath status of the Chornobyl cleanup workers 1986-1987 (period of observation 1988-2012)

    International Nuclear Information System (INIS)

    Buzunov, V.O.; Vojchulene, Yu.S.; Domashevs'ka, T.Je.; Khabarova, T.P.; Kortushyin, G.Yi.

    2015-01-01

    Long-term cohort epidemiological study (period of observation 1988-2012) has been conducted using data of the State Registry of Ukraine of Persons Affected by the Chornobyl Accident. Study cohort - 196,423 males-participants of the Chornobyl recovery operations in 1986-1987. Epidemiological and mathematical- and-statistical methods were used. We have found a dramatic deterioration of the Chornobyl cleanup workers' health due to the growth of wide range of nontumor diseases, especially circulatory, digestive, respiratory, endocrine, genitourinary and nervous system diseases. In postaccident period, disability and mortality have increased significantly due to nontumor diseases. Circulatory diseases make major contribution to the structure of causes of disability and death. When studying the dynamics of nontumor incidence, we have found that in 1988-1992 the highest, throughout postaccident period, rate of mental and behavioral disorders, diseases of the nervous system was mainly due to disorders of the autonomic nervous system. Since 1993-1997, rate of this pathology has significantly reduced and remained stable in subsequent years of observation. Thus, we can assume that in the early postaccident period, stress factor in combination with radiation one had the greatest impact on health of cleanup workers, resulting in the development of other nontumor diseases in the remote postaccident period. The study revealed an evident increase in nontumor incidence, disability and mortality from nontumor diseases among Chornobyl cleanup workers 1986-1987; the highest rate of nontumor incidence was observed 12-21 years after the Chornobyl accident

  6. Theoretical studies of intermediate-energy nuclear physics: Annual technical progress report for April 1, 1987 to March 31, 1988

    International Nuclear Information System (INIS)

    Horowitz, C.J.; Macfarlane, M.H.; Serot, B.D.

    1988-01-01

    In the period covered by this report (April 1, 1987 to March 31, 1988), work focused on five main areas: Relativistic Theories of Nuclear Structure and Saturation; Relativistic Descriptions of Proton-Nucleus Scattering; Multipole Sum Rules and Ground-State Correlations; Gamow-Teller Excitations in Nuclear Charge-Exchange Reactions; Relativistic Many-Body Theory at Finite Temperature and Density. Results and publications in these areas are summarized in this report. 32 refs., 1 fig

  7. Chemical and depth data from the ALPHA HELIX using bottle casts in the Bering Sea from 1987-09-07 to 1988-06-11 (NODC Accession 0000263)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Chemical and depth data were collected from the ALPHA HELIX from September 7, 1987 to June 11, 1988. Data were submitted by the University of Alaska - Fairbanks;...

  8. UK Safeguards R and D Project progress report for the period May 1987 -April 1988

    International Nuclear Information System (INIS)

    Packer, T.W.

    1988-09-01

    The main categories of task included in the United Kingdom safeguards research and development programme are summarised in the first section. These are: tasks concerned with the development of instruments and techniques for reprocessing and centrifuge enrichment plant safeguards; tasks concerned with the development of instruments and techniques for general application in the field of safeguards; tasks which are services to the International Atomic Energy Authority and exploratory and short term tasks which occur from time to time. The next three sections contain progress reports on the individual tasks and section 6 lists reports and papers relevant to work on UK safeguards research and development published between May 1987 and April 1988. (U.K.)

  9. Advanced engineering design program at the University of Illinois for the 1987-1988 academic year

    Science.gov (United States)

    Sivier, Kenneth R.; Lembeck, Michael F.

    1988-01-01

    The participation of the University of Illinois at Urbana-Champaign in the NASA/USRA Universities Advanced Engineering Design Program (Space) is reviewed for the 1987 to 88 academic year. The University's design project was the Manned Marsplane and Delivery System. In the spring of 1988 semester, 107 students were enrolled in the Aeronautical and Astronautical Engineering Departments' undergraduate Aerospace Vehicle Design course. These students were divided into an aircraft section (responsible for the Marsplane design), and a spacecraft section (responsible for the Delivery System Design). The design results are presented in Final Design Reports, copies of which are attached. In addition, five students presented a summary of the design results at the Program's Summer Conference.

  10. Coal. [1987 and 1989

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-01

    Despite increases in recently negotiated coal prices in US dollar terms, unit export returns for Australian coal are expected to rise only marginally in 1988-89 due to the anticipated appreciation of the Australian dollar. Australian coal production is expected to recover in 1988-89, after falling in 1987-88. A table summarising coal statistics in 1985-87 is presented. 2 figs., 1 tab.

  11. Oldman River Dam wildlife habitat mitigation program, Pincher Creek, Alberta: Final report. Summary of the implementation phase, 1987--1993

    International Nuclear Information System (INIS)

    1998-01-01

    This article summarizes the 1987--1993 implementation phase of the Oldman River Dam Wildlife Habitat Mitigation Program, intended to offset the negative impact of dam construction and operation on plant and animal species. Projects carried out during the program included creation of wetlands, tree and shrub planting, installation of snow and wildlife fences, and installation of replacement nesting sites for birds. Summaries are provided of the process that led to the final program design, the projects undertaken to complete the program, the design strategies, and the proposed habitat mitigation projects. Also included are an inventory of completed projects, an evaluation of the program's success in meeting its objectives and of the mitigation techniques used in the program, and a recommended strategy for future management of the program. Appendices include habitat suitability index models, summaries of related reports, vegetation maps, and a grazing management plan

  12. Indiana University high energy physics, Task A: Technical progress report, December 1, 1987-November 30, 1988

    International Nuclear Information System (INIS)

    Brabson, B.B.; Crittenden, R.R.; Dzierba, A.R.; Martin, H.J.; Ogren, H.O.; Zieminski, A.

    1988-01-01

    This year at Brookhaven data from last year's run on the production of the KKπ system by π's, K's and antiprotons was analyzed. Analysis of the Fermilab fixed-target jet experiment, E557, resulted in 3 publications. In addition two conference contributions were prepared and a third paper will be written. Otherwise E557 is finished. A dimuon detector for E672 was installed and tested. This took place in early 1987. Data were from June, 1987 to February, 1988. Some 800 tapes of triggers (about 10K/tape) are in hand with data from both the E672 and E706 apparatus. We participated in the coordination and writing of software for the D0 collider detector at Fermilab. We will be increasing our efforts in D0. Data-taking with the High-Resolution Spectrometer (HRS) at SLAC is completed. This year 12 publications resulted. More are in preparation. Hardware was built for the muon upgrade for the Mark2 detector at the SLC. Beam position monitors for the SLC are being built and also working on 308/E microprocessors for Mark2 data analysis. At SLAC we are also involved in the SLC Polarization Collaboration

  13. Evaluation and compilation of DOE waste package test data: Biannual report, August 1987--January 1988

    International Nuclear Information System (INIS)

    Interrante, C.; Escalante, E.; Fraker, A.; Ondik, H.; Plante, E.; Ricker, R.; Ruspi, J.

    1988-08-01

    This report summarizes results of the National Bureau of Standards (NBS) evaluations on waste packages designed for containment of radioactive high-level nuclear waste (HLW). The waste package is a proposed engineered barrier that is part of a permanent repository for HLW. Metal alloys are the principal barriers within the engineered system. Since enactment of the Budget Reconciliation Act for Fiscal Year 1988, the Yucca Mountain, Nevada, site (in which tuff is the geologic medium) is the only site that will be characterized for use as high-level nuclear waste repository. During the reporting period of August 1987 to January 1988, five reviews were completed for tuff, and these were grouped into the categories: ferrous alloys, copper, groundwater chemistry, and glass. Two issues are identified for the Yucca Mountain site: the approach used to calculate corrosion rates for ferrous alloys, and crevice corrosion was observed in a copper-nickel alloy. Plutonium can form pseudo-colloids that may facilitate transport. NBS work related to the vitrification of HLW borosilicate glass at the West Valley Demonstration Project (WVDP) and the Defense Waste Processing Facility (DWPF) and activities of the DOE Materials Characterization Center (MCC) for the 6-month reporting period are also included. 27 refs., 3 figs

  14. Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L.; Scholz, Allan T.; Griffith, James R.

    1990-10-01

    In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. The monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.

  15. Evaluation of the geologic relations and seismotectonic stability of the Yucca Mountain area, Nevada Nuclear Waste Site Investigation (NNWSI); Final report, January 1, 1987--June 30, 1988: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-10-01

    This report provides a summary of progress for the project ``Evaluation of the Geologic Relations and Seismotectonic Stability of the Yucca Mountain Area, Nevada Nuclear Waste Site Investigation (NNWSI)`` for the eighteen month period of January 1, 1987 to June 10, 1988. This final report was preceded by the final report for the initial six month period, July 1, 1986 to December 31, 1986 (submitted on January 25, 1987, and revised in June 1987.) Quaternary Tectonics, Geochemical, Mineral Deposits, Vulcanic Geology, Seismology, Tectonics, Neotectonics, Remote Sensing, Geotechnical Assessments, Geotechnical Rock Mass Assessments, Basinal Studies, and Strong Ground Motion.

  16. The US uranium industry's operations and financial performance during 1988

    International Nuclear Information System (INIS)

    Walton, H.

    1989-01-01

    This paper presents the operating and financial statistics collected from the U.S. uranium industry by the Energy Information Administration (EIA). Uranium concentrate production probably is the most important indicator of overall activity in the domestic raw materials industry. Production in 1988 of 13.1 million pounds U 3 O 8 was only slightly higher than 1987 production, however it was about 70 percent less than the peak production level of 43.7 million pounds recorded in 1980. Production in 1988 from conventional milling was 7.0 million pounds, a decrease of 18 percent from the 8.5 million pounds produced in 1987. Production from nonconventional facilities in 1988 was 6.1 million pounds U 3 O 8 , and increase of 37 percent above the level for 1987. This is the highest level for production from nonconventional facilities since 1981

  17. Limits on an optical pulsar in supernova 1987A

    International Nuclear Information System (INIS)

    Pennypacker, C.R.; Morris, D.E.; Muller, R.A.

    1989-01-01

    Since March 1987 the optical flux from supernova 1987A for periodic pulsations has been sought. As of August 1988, after 38 separate observations, no pulsar has been detected. The typical upper limit placed on the pulsed fraction optical light from the supernova is 0.0002, for pulse frequencies in the range 0.03-5000 Hz. The best limit on the pulsed fraction of supernova light is 7 x 10 to the -6th, on January 22, 1988. On August 28, 1988 the faintest limit for the magnitude of the pulsar, dimmer than 20th mag is reached. These limits are based on Fourier transforms of up to 67 million points, covering a range of spindown rates. 25 refs

  18. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1994-10-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1994 spring outmigration at migrant traps on the Snake River, Clearwater River, and Salmon River. The 1994 snowpack was among the lowest since the beginning of the present drought, and the subsequent runoff was very poor. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1994. Total annual (hatchery + wild) chinook salmon catch at the Snake River trap was 1.5 times greater than in 1993. Hatchery and wild steelhead trout catches were similar to 1993. The Snake River trap collected 30 age 0 chinook salmon. Hatchery chinook salmon catch at the Clearwater River trap was 3.5 times higher than in 1993, and wild chinook salmon catch was 4.2 times higher. Hatchery steelhead trout trap catch was less than half of 1993 numbers because the trap was fishing near the north shore during the majority of the hatchery steelhead movement due to flow augmentations from Dworshak. Wild steelhead trout trap catch was 2 times higher than in 1993. The Salmon River trap was operated for about a month longer in 1994 than in 1993 due to extremely low flows. Hatchery chinook salmon catch was 1.4 times greater in 1994 than the previous year. Wild chinook salmon catch was slightly less in 1994. The 1994 hatchery steelhead trout collection did not change significantly from 1993 numbers. Wild steelhead trout collection in 1994 was 59% of the 1993 catch. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993, cumulative interrogation data is not comparable with the prior five years (1988-1992).

  19. Official opening of the Olympic Dam project

    International Nuclear Information System (INIS)

    Parbo, A.

    1989-01-01

    This is the text of an address given on November 5, 1988 to mark the commencement of production of copper, uranium, gold and silver from the first stage of the Olympic Dam project at Roxby Downs, South Australia. The huge deposit was discovered in 1975 and years of exploration, underground development, metallurgical testing, planning and establishing the infrastructure followed, at a cost of $750 million. 740 people are now employed at Olympic Dam. The first shipment of copper and uranium oxide left for Sweden at the end of November 1988. The deposit is able to support a much higher production rate as the market for the products, particularly uranium, improves

  20. ANSTO strategic plan 1988-1993

    International Nuclear Information System (INIS)

    1988-12-01

    This Strategic Plan outlines the development of the Australian Nuclear Science and Technology Organisation in the five year period 1988/89-1992/93. Its formulation is a continuation of the corporate planning process, initiated after the promulgation of the ANSTO Act in April 1987, which culminated in the publication of the ANSTO Corporate Plan, 1987. The Plan constitutes the basis for the development of business plans for each sector of the Organisation

  1. Streamflow and water-quality data for Meadow Run Basin, Fayette County, Pennsylvania, December 1987-November 1988. Open file report

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Witt, E.C.

    1989-01-01

    Streamflow and water-quality data were collected throughout the Meadow Run basin, Fayette County, Pennsylvania, from December 7, 1987 through November 15, 1988, to determine the prevailing quality of surface water over a range of hydrologic conditions. The data will assist the Pennsylvania Department of Environmental Resources during its review of coal-mine permit applications. A water-quality station near the mouth of Meadow Run provided continuous-record of stream stage, pH, specific conductance, and water temperature. Monthly water-quality samples collected at the station were analyzed for total and dissolved metals, nutrients, major cations and anions, and suspended-sediment concentrations

  2. Annual report of National Institute of Radiological Sciences, April 1987 - March 1988

    International Nuclear Information System (INIS)

    1988-07-01

    The Annual Report of April 1987-March 1988 provides the information on up-to-date research activities of the National Institute of Radiological Sciences (NIRS) in Japan. Researches undertaken in the NIRS aim at promoting medical application of radiation and at investigating health effects of radiation and radiation protection. The research scope is therefore widely ranging from physics to genetics and from environmental science to clinical medicine. In addition to basic researches carried out by 14 research divisions, the following three longterm projects which were organized by scientists recruited from several divisions are currently in progress: (1) stochastic effects of radiation and risk estimation; (2) assessment of human exposure to environmental radiation; and (3) medical use of accelerated heavy ions. Projects (1) and (2) were finalized in this fiscal year. This volume is divided into the following scientific categories for ease of reader's understanding: physics, chemistry, biochemistry and biophysics, cell biology, immunology and hematology, pathology and physiology, genetics, clinical research, and environmental science, covering a total of 93 titles. Activities of each research division and organization of the NIRS are given in Appendices. (N.K.)

  3. Cambios en la prevalencia de la caries dental en escolares de tres regiones de México: encuestas de 1987-1988 y de 1997-1998

    Directory of Open Access Journals (Sweden)

    Velázquez Monroy Oscar

    2003-01-01

    Full Text Available OBJETIVO: Comparar la prevalencia y la gravedad de la caries dental en dos estudios de vigilancia epidemiológica realizados en tres regiones de México en los años 1987-1988 y en 1997-1998. MÉTODOS: La encuesta de 1987-1988 se aplicó a una muestra representativa de escolares de 6 a 10 años de edad de los estados de Nuevo León, Tabasco y el Distrito Federal (D.F.; adicionalmente se incluyeron escolares de 12 años del D.F. El total de alumnos examinados en 1987-1988 fue de 7590. En la encuesta de 1997-1998 se incluyó a escolares de 6 a 10 y 12 años de edad de las tres regiones estudiadas. El total de alumnos incluidos en 1997-1998 fue de 8164. Se compararon las medias del índice de dientes cariados, perdidos u obturados (CPOD de cada grupo de edad en ambos períodos. RESULTADOS: Los resultados mostraron una disminución de la prevalencia y de la gravedad de la caries dental en los grupos de edad examinados (P < 0,05. En 1997-1998, tanto en el estado de Tabasco como en el de Nuevo León se logró la meta propuesta por la Organización Mundial de la Salud de reducir a no más de tres los dientes cariados, perdidos u obturados a los 12 años de edad, con índices de CPOD de 2,67 y 1,72, respectivamente, aunque el D.F. sobrepasó esa cifra tope (CPOD = 3,11. CONCLUSIÓN: La disminución observada en los índices CPOD podría deberse a varios factores, tales como el consumo de sal fluorada, el uso de dentífricos y enjuagues fluorados, y un mayor acceso a los servicios odontológicos.

  4. High energy physics at the University of Iowa: Progress report, 1 February 1987-31 January 1988

    International Nuclear Information System (INIS)

    McCliment, E.R.; Newsom, C.R.; Onel, Y.; Mallik, U.

    1988-01-01

    Research in high-energy physics at Iowa is in three areas--hyperon decay (ERM and CRN), hadronic interactions (Y. Onel), and charm physics (U. Mallik). In this document we report our progress in each of these areas. McCliment and Newsom built a silicon Σ + and Ξ - radiative decays. The SSD system was extensively tested in Proton Center during the 1987-1988 fixed-target run. Studies included alignment, tracking, efficiency, noise, and temperature stability. Work was also completed on a measurement of the Ξ - production polarization and magnetic moment from E715 data. A draft of the paper is included in the progress report as Appendix A. The polarized beam line for experiment E704 was commissioned during the same fixed-target run. Onel and his students were involved in running and developing the analysis for the Coulomb Nuclear Interaction Polarimeter. Our preliminary analysis indicates that the polarization beam is consistent with design expectations. During 1988 we also constructed five drift chambers and a delay line chamber for Fermilab experiment E683. We have also spent a limited amount of time on our CERN activities in designing, planning, and doing calculations and simulations for M258 (SPIN-SPLITTER). At MARK III, U. Mallik completed an amplitude analysis of the decay mode J//Psi/ → Ω + f 2 (1270), which will soon be submitted to Physical Review D. A draft of this paper is included as Appendix B. She presented an invited talk on the MARK III results at the BNL spectroscopy conference, ''Glueballs, Hybrids, and Exotics.'' This talk will be published in the proceedings. She also worked with the e-p physics group at the Snowmass Workshop in Summer, 1988. This work will also be published in the Snowmass proceedings. Her student, Maria Roco, participated in drift chamber repair and software of the MARK III at SLAC in the summer of 1988

  5. Annual report 1987-88

    International Nuclear Information System (INIS)

    1988-01-01

    The tenth annual report of the Supervising Scientist on the operation of the Environment Protection (Alligator Rivers Region) Act 1978 covers the period 1 July 1987 to 30 June 1988. Significant developments include the adequacy of water and sediment runoff control measures at Coronation Hill, the options aimed at reducing the chance of water release from the Ranger Uranium Mine site during the Wet season and an incident involving an overflow of material from a tailings neutralisation tank at the Ranger mine site on 1-2 February 1988

  6. Turbidity, SOLAR RADIATION - ATMOSPHERIC and other data from OSHORO MARU in the Bay of Bengal, North Pacific Ocean and North Atlantic Ocean from 1987-11-27 to 1988-09-04 (NODC Accession 9700003)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Hydrochemical, hydrophysical, and other data were collected from the OSHORO MARU from November 27, 1987 to September 4, 1988. Data were submitted by Katsuji...

  7. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2004-09-01

    The runoff volumes in 2003 were below average for the January to July period above Lower Granite Dam (79%) and The Dalles Dam (82%). The year 2003 hydrosystem operations and runoff conditions resulted in flows that met the spring seasonal Biological Opinion flow objectives at Lower Granite Dam, McNary Dam and Priest Rapids Dam. However, summer seasonal flows at Lower Granite Dam and McNary Dam were considerably below the Biological Opinion objectives of 50.7 Kcfs at Lower Granite Dam and 2000 Kcfs at McNary Dam. Actual summer seasonal flows were just 32.3 Kcfs and 135.5 Kcfs, respectively. In most instances spill was provided as described by the Biological Opinion program for fish passage, within the constraints of the State waivers for total dissolved gas supersaturation levels. Spill was altered during spill testing and most notably during the month of August at Ice Harbor dam. At this project spill was modified from a 24-hour program to a 12-hour nightly spill period pending the evaluation of studies being conducted in-season. Spill was not returned to full implementation of the Biological Opinion levels even after data showed that spillway passage had the highest associated fish survival. This experience demonstrated the difficulty of managing the hydrosystem for fish passage based on preliminary data and data collected in-season. Increased hatchery releases and higher wild fish production resulted in a population of yearling chinook at Lower Granite Dam being one of the highest observed in recent years. However, the increased hatchery production may have been offset to some extent by decreased survival from release to Lower Granite Dam as suggested by the lower than average survival observed for the PIT tagged trap released fish to Lower Monumental Dam. Travel times were also longer for hatchery spring chinook compared to recent past years. The short duration of high flows that occurred in the Lower Snake River was too late for yearling chinook, but likely was

  8. Aerospace and energetics research program: Annual report, 15 August 1987--14 August 1988

    International Nuclear Information System (INIS)

    Vlases, G.C.; Pietrzyk, Z.A.

    1989-01-01

    This document reports on work accomplished under grant DE-FG06-87ER53243 for the period August 15, 1987 - August 14, 1988, on the Coaxial Slow Source device (CSS). The CSS project was initiated within the UW CT program following a favorable peer review in March 1984, and began operating in February 1985. The CSS was conceived to provide an alternative generation scheme for ERC's which is more amenable to scaling to reactor size devices by virtue of its low voltage, slow rise time characteristics. Prior to the present reporting period it had already been found possible to generate the desired ''annular FRC's'' over a wide range of fill pressures, using applied loop voltages of 2 kV with a rise time of about 30 μs. Considerable progress has been made during the last 12 months. A substantially upgraded device, which we call CSS-U, was built and put into operation in an expanded 1500 ft 2 laboratory. The diagnostics were also considerably upgraded. Initial operation of the CSS-U has provided new information into the nature of CSS discharged. 8 refs., 35 figs., 3 tabs

  9. Annual report of the Naka Fusion Research Establishment for the period of April 1, 1987 to March 31, 1988

    International Nuclear Information System (INIS)

    1988-11-01

    Research and development activities of the Naka Fusion Research Establishment for the period of April 1987 to March 1988 are described. In JT-60, the plasma heating experiment aiming at a reactor-grade plasma was started in June 1987, after completing the integrated performance test of NBI and RF heating systems with the tokamak machine, most of the first wall being replaced to carbon tiles from titanium-carbide films. Enphasis was placed in the experiment on increasing the plasma current together with the optimization of plasma control and heating. The steady improvement of plasma performance lead finally in September reactor-grade plasma parameters, which were located inside the region depicted by the Atomic Energy Commission at the start of the JT-60 project. In JFT-2M and Doublet III-D, extensive experiments revealed detailed phenomenology of H-mode transition and its characteristics. The test of a prototype turbo molecular pump with a ceramic rotor driven by gas turbine was successfully completed. In the development of negative ion sources, steady improvement was made in the efficiency of negative ion formation and beam extraction. In the RF technology, test-fabricated 120 GHz gyrotron worked well. The Demo Poloidal Coil program was progressed as scheduled. The coils, two NbTi and one Nb 3 Sn, were under fabrication. The large cryogenic system was completed by sharing the JT-60 power supply. In the Tritium Process Laboratory, installation into glove boxes was completed in March 1988 of various experimental apparatus, i.e., fuel clean-up system, cryogenic distillation and thermal diffusion systsms for hydrogen isotope separation etc. In the reactor design study, recapitulation and review of FER design for last two years were made. (author)

  10. Nutrients data from the R/V ALPHA HELIX and T.G. THOMPSON as part of the Inner Shelf Transfer and Recycling Project from 17 April 1987 to 21 July 1988 (NODC Accession 0000296)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Nitrate, nitrite, phosphate, silicate, and other data were collected from the R/V ALPHA HELIX and THOMAS G. THOMPSON from April 17, 1987 to July 21, 1988. Data were...

  11. Near-surface ozone content at the Molodezhnaia and Mirnyi Antarctic stations, according to measurements made during spring 1987 to autumn 1988

    Energy Technology Data Exchange (ETDEWEB)

    Gruzdev, A.N.; Elokhov, A.S. (Rossiiskaia Akademiia Nauk, Institut Fiziki Atmosfery, Moscow (Russian Federation))

    1992-01-01

    Results are presented of near-surface ozone measurements at the Molodezhnaia and Mirnyi Antarctic stations, conducted from the spring of 1987 to the autumn of 1988, as well as of measurements by an aircraft flying along the Mirnyi-Vostok-Mirnyi path (one flight). Mechanisms of diurnal, day-to-day, and annual ozone variability are examined. It is found that, during synoptically active periods, the near-surface ozone correlates positively with the temperature above the atmosphere-land boundary layer, while during the synoptically quiet period the ozone concentrations correlate with the direction of the surface katabatic wind. 29 refs.

  12. Scientific and technical production of Ipen - 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This bulletin shows the papers done by the Ipen's researches during the 1988. In the appendix, the papers published since 1985 to 1987 are presented. The references are grouped by publications types. (author) [pt

  13. Radioactivity of people in Finland in 1988

    International Nuclear Information System (INIS)

    Rahola, T.; Suomela, M.; Illukka, E.; Pusa, S.

    1991-03-01

    After the reactor accident at Chernobyl radioactive fallout was carried by air streams to most parts of Europe. In 1988 radionuclides causing internal contamination were transported to man only via foodchains and no longer via inhalation, as had happened immediately after the Chernobyl accident. To determine the level of radionuclides in the body and to estimate the internal radiation doses caused by the Chemobyl accident, whole-body counting measurements were performed. Nine different groups of people were measured during 1988. Three were local reference groups, two groups of radiation workers, one a population group representing the whole country and three groups representing those with special dietary habits. The weighted mean 137 Cs body burden in the population group was 1300 Bq at the end of 1988, the minimum body burden being 50 Bq and the maximum 7700 Bq. The measurement data showed that the maximum body burdens were reached in summer 1987. The group with special diets did not necessarily follow this pattern. The mean effective dose equivalents delivered to people in Finland in 1988, estimated by using the measurement data on the population goup, was 0.05 mSv the corresponding dose equivalent in 1987 being 0.08 mSv

  14. Measuring taste impairment in epidemiologic studies: the Beaver Dam Offspring Study.

    Science.gov (United States)

    Cruickshanks, K J; Schubert, C R; Snyder, D J; Bartoshuk, L M; Huang, G H; Klein, B E K; Klein, R; Nieto, F J; Pankow, J S; Tweed, T S; Krantz, E M; Moy, G S

    2009-07-01

    Taste or gustatory function may play an important role in determining diet and nutritional status and therefore indirectly impact health. Yet there have been few attempts to study the spectrum of taste function and dysfunction in human populations. Epidemiologic studies are needed to understand the impact of taste function and dysfunction on public health, to identify modifiable risk factors, and to develop and test strategies to prevent clinically significant dysfunction. However, measuring taste function in epidemiologic studies is challenging and requires repeatable, efficient methods that can measure change over time. Insights gained from translating laboratory-based methods to a population-based study, the Beaver Dam Offspring Study (BOSS) will be shared. In this study, a generalized labeled magnitude scale (gLMS) method was used to measure taste intensity of filter paper disks saturated with salt, sucrose, citric acid, quinine, or 6-n-propylthiouracil, and a gLMS measure of taste preferences was administered. In addition, a portable, inexpensive camera system to capture digital images of fungiform papillae and a masked grading system to measure the density of fungiform papillae were developed. Adult children of participants in the population-based Epidemiology of Hearing Loss Study in Beaver Dam, Wisconsin, are eligible for this ongoing study. The parents were residents of Beaver Dam and 43-84 years of age in 1987-1988; offspring ranged in age from 21-84 years in 2005-2008. Methods will be described in detail and preliminary results about the distributions of taste function in the BOSS cohort will be presented.

  15. Nuclear Energy Decree of February 12, 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This decree no. 161/1988 entered into force on 1 March 1988. It was made in accordance with Section 82 of the 1987 Nuclear Energy Act and aims to define the scope of application of the Act. The Decree deals with the licensing procedure for nuclear installations and competence in this field. It also establishes exemptions to the licencing of radioactive materials and covers radioactive waste management and its financing. (NEA) [fr

  16. Energy Program annual report, 1988

    International Nuclear Information System (INIS)

    Borg, I.Y.

    1989-07-01

    This report is a summary of work done during FY 1988 (October 1, 1987--September 30, 1988) by the Energy Program of the Lawrence Livermore National Laboratory (LLNL). The program addresses problems relating to supply and utilization of energy in the US. Traditionally the focus of activities has been on long-range technical challenges that are unlikely to be pursued by the private sector. Individual projects making up the Energy Program are divided into three sections in this review: Nuclear Energy, Fossil Energy, and Nonfossil Energy. (Nonfossil Energy research includes work on geothermal resources and combustion chemistry.)

  17. Polarized proton acceleration at the BNL AGS, 1988

    International Nuclear Information System (INIS)

    Ahrens, L.

    1988-01-01

    The present status of the polarized proton acceleration at the Brookhaven AGS is described. Some details regarding the tune-up and performance during the December 1987-January 1988 physics run are given. 2 refs., 4 figs

  18. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  19. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  20. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  1. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  2. Asymmetry of the envelope of supernova 1987A

    Energy Technology Data Exchange (ETDEWEB)

    Papaliolios, C.; Karovska, M.; Koechlin, L.; Nisenson, P.; Standley, C.; Heathcote, S.

    1989-04-13

    The supernova SN1987A in the Large Magellanic Cloud has been observed by high-angular-resolution speckle interferometry since 25 March (30 days after the explosion) with the 4-m telescope at the Cerro Tololo Interamerican Observatory. Data obtained on 25 March and 2 April 1987 revealed a second bright 'companion' source separated from the supernova by 60 milliarcseconds and less than three magnitudes fainter than the supernova. Measurements of the average diameter of the supernova envelope have been made from data recorded from March 1987 to April 1988. Here we present a more detailed analysis of these data, which shows that the expanding envelope is asymmetric. (author).

  3. Asymmetry of the envelope of supernova 1987A

    International Nuclear Information System (INIS)

    Papaliolios, C.; Karovska, M.; Koechlin, L.; Nisenson, P.; Standley, C.; Heathcote, S.

    1989-01-01

    The supernova SN1987A in the Large Magellanic Cloud has been observed by high-angular-resolution speckle interferometry since 25 March (30 days after the explosion) with the 4-m telescope at the Cerro Tololo Interamerican Observatory. Data obtained on 25 March and 2 April 1987 revealed a second bright 'companion' source separated from the supernova by 60 milliarcseconds and less than three magnitudes fainter than the supernova. Measurements of the average diameter of the supernova envelope have been made from data recorded from March 1987 to April 1988. Here we present a more detailed analysis of these data, which shows that the expanding envelope is asymmetric. (author)

  4. Dam water quality study. Report to Congress

    International Nuclear Information System (INIS)

    1989-05-01

    The objective of the report is to identify water quality effects attributable to the impoundment of water by dams as required by Section 524 of the Water Quality Act of 1987. The document presents a study of water quality effects associated with impoundments in the U.S.A

  5. Streamflow and water-quality data for Little Scrubgrass Creek basin, Venango and Butler Counties, Pennsylvania, December 1987 - November 1988

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Durlin, R.R.

    1989-01-01

    Streamflow and water-quality data were collected throughout the Little Scrubgrass Creek basin, Venango and Butler Counties, Pennsylvania, from December 1987 to November 1988, to determine the prevailing quality of surface water throughout the basin. This data will assist the Pennsylvania Department of Environmental Resources during its review of coal mine permit applications. A water-quality station on Little Scrubgrass Creek near Lisbon, provided continuous-record of stream stage, Ph, specific conductance, and water temperature. Monthly water-quality samples collected at this station were analyzed for total and dissolved metals, nutrients, major cations and anions, and suspended sediment concentrations. Fourteen partial-record sites, located throughout the basin, were similarly sampled four times during the period of study. Streamflow and water-quality data obtained at these sites during various base flow periods are also presented. 14 refs., 4 figs., 14 tabs

  6. Performance monitoring report for the Niagara Falls Storage Site Waste Containment Structure, Lewiston, New York: Calendar year 1987 and January--June of 1988

    International Nuclear Information System (INIS)

    Blanke, J.A.; Johnson, R.T.; Stanley, W.F.

    1989-01-01

    A performance monitoring program has been developed for the Niagara Falls Storage Site (NFSS) Waste Containment Structure (WCS). The WCS contains soils contaminated with residual radioactive materials, rubble, and radioactive residues removed from various areas of the NFSS and vicinity properties during remedial action conducted by the Department of Energy (DOE) from 1982 through 1986. The NFSS is a part of the DOE Surplus Facilities Management Program (SFMP). The purpose of the performance monitoring program is to verify that the WCS main engineering elements are functioning to minimize infiltration of rainfall; prevent pollution of groundwater; preclude formation of leachate; and prevent radon emanation. This report presents the findings of performance monitoring conducted at the WCS during calendar year 1987, and January through June of 1988. the data received during the initial performance monitoring period in 1986 (Ref. 3) established a baseline for interpretation contained in this report. The period covered by this report has been expanded to include 6 months in 1988 because the impact of the winter is most evident in the spring growing season. 5 refs., 12 figs., 8 tabs

  7. 1988 activity report of the Nuclear Physics Institute

    International Nuclear Information System (INIS)

    1989-06-01

    The 1988 activity report of the Nuclear Physics Institute (France) is presented. The report covers the scientific activities from the 1st October 1987 to the 30th September 1988 and the technical developments form the 1st October 1986 to the 30th September 1988. The main research fields include works on exotic nuclei, hot nuclei characteristics, physics of strangeness, nuclear structure studies by means of nuclear reactions, high spin states and radiochemistry. The project of an electron accelerator, delivering a 4 GeV beam (in a first step), is one of the Institute's priorities. The research works carried out in the Experimental Research and Theoretical Physics Divisions as well as technological projects are included [fr

  8. McMaster Accelerator Laboratory. Annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This Annual Report summarizes the research activities at the McMaster Accelerator Laboratory. Included are reports of work carried out during the period of November 1987 to September 1988 with separate subsections for Nuclear Physics Research, Accelerator Mass Spectrometry, Atomic, Molecular and Material Sciences, and Nuclear Medicine. A number of the research reports are of a preliminary nature and the authors should be contacted before results are quoted. Details of the facility and its operation follow with reports of our computer control group. Finally there is a list of publications covering the period January 1987 to September 1988. The two major accelerators continue to operate very well. The model FN tandem Van De Graaff was used by four research groups for routine runs at a terminal voltage of 10 MV or higher with serveral days of experiments at 11 MV. The variety and stability of heavy ion beams continues to increase. Our technical staff have done an excellent job of improving and upgrading this facility and are to be congratulated on a job well done

  9. Environmental monitoring at Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The environmental management and protection program at the Olympic Dam uranium/copper/gold project, Roxby Downs, South Australia, monitors eight major environmental parameters - meteorology, vegetation, mine site rehabilitation, fauna, terrain, soil salinity, hydrogeology and well fields. It came into effect with the approval of the South Australian Government in March 1987. The Great Artesian Basin, one of the world's greatest artesian basins, is the source of the water supply for the project

  10. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproductive Success of Kokanee in the Flathead System, 1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Zubik, Raymond; Clancey, Patrick

    1988-05-01

    Studies of kokanee reproductive success in the Flathead system from 1981 to 1987 have assessed the losses in fish production attributable to hydroelectric operations. We estimated that the Flathead Lake shoreline spawning stock has lost at least 50,000 fish annually, since Kerr Dam was completed in 1938. The Flathead River spawning stock has lost 95,000 spawners annually because of the operations of Hungry Horse Dam. Lakeshore spawning has been adversely affected because Flathead Lake has been drafted to minimum pool during the winter when kokanee eggs are incubating in shallow shoreline redds. Egg mortality from exposure and desiccation of kokanee redds has increased since the mid 1970's. When the lake was drafted more quickly and held longer at minimum pool. Escapement surveys in the early 1950's, and a creel survey in the early 1960's have provided a baseline to which the present escapement levels can be compared, and loss estimated. Main stem Flathead River spawning has also declined since the mid 1970's when fluctuating discharge from Hungry Horse Dam during the spawning and incubation season exposed redds at the river margin and increased mortality. This decline followed an increase in main stem spawning in the late 1950's through the mid 1960's attributable to higher winter water temperature and relatively stable discharge from Hungry Horse Dam. Spawning escapement in the main stem exceeded 300,000 kokanee in the early 1970's as a result. Spawning in spring-influenced sites has comprised 35 percent of the main stem escapement from 1979 to 1986. We took that proportion of the early 1970's escapement (105,000) as the baseline against which to measure historic loss. Agricultural and suburban development has contributed less significantly to degradation of kokanee spawning habitat in the river system and on the Flathead Lake shoreline. Their influence on groundwater quality and substrate composition has limited

  11. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  12. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  13. Dam safety at Seven Sisters Generating Station

    International Nuclear Information System (INIS)

    Carson, R. W.; Gupta, R. C.

    1996-01-01

    A safety surveillance program for all hydraulic structures in Manitoba was first implemented in 1979, and updated in 1988. This contribution describes the current status of the program, and the nature of the issues that the program was designed to address. The Seven Sisters Station's dam on the Winnipeg River, about 90 km northeast of the City of Winnipeg, was used as an example. Extensive reviews of flood risks and downstream inundation potential at Seven Sisters' revealed a number of deficiencies; these findings will be incorporated into a corporate plan of overall remediation. Updating the program will also include efforts to ensure adherence to national dam safety guidelines. 5 figs

  14. The 1988 coal outlook: steadily rising consumption

    Energy Technology Data Exchange (ETDEWEB)

    Soras, C.G.; Stodden, J.R.

    1987-12-01

    Total coal use - domestic and foreign - will reach 910 million tons in 1988, an expansion of 1.3% from an estimated 898 million tons in 1987. The overall rise in consumption will add to inventory needs. Moreover, lower interest rates cut effective carrying costs and further encourage the holding of coal stocks by users. The results will be a gain in inventories of 3.5 tons by the end of 1988. As a result of all these factors, coal production is anticipated to rise by 11.6 million tons, or 1.2%, which projects firm markets in a time of relatively soft economic conditions in the USA. 2 tabs.

  15. High-energy γ-ray observations of SN 1987A

    International Nuclear Information System (INIS)

    Sood, R.K.; Thomas, J.A.; Waldron, L.; Manchanda, R.K.; Rochester, G.K.; Sumner, T.J.; Frye, G.; Jenkins, T.; Koga, R.; Ubertini, P.; Bazzano, A.; La Padula, C.; Staubert, R.; Kendziorra, E.

    1988-01-01

    SN 1987A has been observed with a combined high energy γ-ray (50-500 MeV) and hard X-ray (15-50 keV) payload during a balloon flight on 5 April 1988 from Alice Springs, Australia. The γ-ray observations, along with our earlier ones on 19 April 1987 are the only such observations of the supernova to date. The γ-ray detector characteristics are described. The preliminary results of the recent flight and their implications in terms of the known supernova parameters are discussed. 17 refs., 6 figs

  16. Department of the Navy Justification of Estimates for Fiscal Years 1988 and 1989 Submitted to Congress January 1987. Operation & Maintenance, Navy. Book 2 of 3. Budget Activity 7: Central Supply and Maintenance

    Science.gov (United States)

    1987-01-01

    installation of these kits. The objective is a coordinated and balanced program between kit procurement and kit installation. Modifications are installed...1987. 26 4. Program Decreases -6,278 A. Other Program Decreases in FY 1988 (-6,278) 1) Warehouse Enhancements/Quality of Worklife - Reduction in funding...the balancing of organic w6rkload requirements. 2Z Cog Restoration - Reflects .2,283 other eleclroic -equipment restorations increase from 226 to 405

  17. Post Flood Report March/April 1987.

    Science.gov (United States)

    1987-04-01

    JUSTIICATION ELECTE _ (SJUN .3 U DISIRIBWEION / NSRCTIEDo / AVAILABILIT CODES DISr AVAIL AND/OR SPECIALHOORHT___ETADREUNTD_-_____ DATE ACCESSIONED...Cotter - Secretary Appreciation is extended to Lawrence Bergen, Chief, Water Control Branch, who gave valuable assistance to RCC during the flood. Cover...photo of spillway discharge at Knightville Dam taken by Leo Milette on 6 April 1987 at 1320 hours with 1.9 feet of water over the crest. V.- V 8 8 4*1

  18. Newall Glacier Snow Pit and Ice Core, 1987 to 1989, Version 1

    Data.gov (United States)

    National Aeronautics and Space Administration — Snow pit and ice core data from the Newall Glacier (location - 162 30' East, 77 35' South) were collected during 1987 and 1988. These include information on...

  19. Streamflow and water-quality data for Little Clearfield Creek basin, Clearfield County, Pennsylvania, December 1987-November 1988. Open File Report

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Durlin, R.R.

    1989-01-01

    Streamflow and water-quality data were collected throughout the Little Clearfield Creek basin, Clearfield County, Pennsylvania, from December 1987 through November 1988, to determine the existing quality of surface water over a range of hydrologic conditions. The data will assist the Pennsylvania Department of Environmental Resources during its review of coal-mine permit applications. A water-quality station near the mouth of Little Clearfield Creek provided continuous-record of stream stage, pH, specific conductance, and water temperature. Monthly water-quality samples collected at the station were analyzed for total and dissolved metals, nutrients, major cations, and suspended-sediment concentrations. Seventeen partial-record sites, located throughout the basin, were similarly sampled four times during the study. Streamflow and water-quality data obtained at these sites during a winter base flow, a spring storm event, a low summer base flow, and a more moderate summer base flow also are presented

  20. 20 CFR 404.1267 - Failure to make timely payments-for wages paid prior to 1987.

    Science.gov (United States)

    2010-04-01

    ... Governments If A State Fails to Make Timely Payments-for Wages Paid Prior to 1987 § 404.1267 Failure to make... to the State under the other provision of the Social Security Act. [53 FR 32976, Aug. 29, 1988, as... paid prior to 1987. 404.1267 Section 404.1267 Employees' Benefits SOCIAL SECURITY ADMINISTRATION...

  1. Personal dose estimations for Olympic Dam's first year of production

    International Nuclear Information System (INIS)

    Sonter, M.; Hondros, J.

    1989-01-01

    Underground development activities have been underway at Olympic Dam since 1983; commercial ore extraction commenced in early 1988; and the metallurgical treatment plant commenced operation in mid 1988. Detailed and extensive radiation monitoring programs have been in place since commencement of activities and have enabled detailed individual assessment of personal doses. Results are shown, in histogram form, of doses to full and part-time underground mine workers pre-1988 and for calendar 1988; and projected annual doses to treatment plant workers for the period July 1988 to July 1989. Comments are included on the dose calculation assumptions applying in mine and mill and on the degree of conservatism of these assumptions. The doses presented show compliance with the limits quoted in the Australian code of practice; they compare well with other underground uranium mines, and they indicate effective pursuit of the 'alara' principle. 7 figs., 1 tab

  2. Streamflow and water-quality data for Little Scrubgrass Creek basin, Venango and Butler Counties, Pennsylvania, December 1987-November 1988. Open File Report

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Durlin, R.R.

    1989-01-01

    Streamflow and water-quality data were collected throughout the Little Scrubgrass Creek basin, Venango and Butler Counties, Pennsylvania, from December 1987 to November 1988, to determine the prevailing quality of surface water throughout the basin. The data will assist the Pennsylvania Department of Environmental Resources during its review of coal mine permit applications. A water-quality station on Little Scrubgrass Creek near Lisbon, provided continuous-record of stream stage, pH, specific conductance, and water temperature. Monthly water-quality samples collected at the station were analyzed for total and dissolved metals, nutrients, major cations and anions, and suspended sediment concentrations. Fourteen partial-record sites, located throughout the basin, were similarly sampled four times during the period of study. Streamflow and water-quality data obtained at these sites during various base flow periods are also presented

  3. La población de oso de las cavernas (Ursus spelaeus parvilatipedis n. ssp. de Troskaeta'ko-Kobea (Ataun - Gipuzkoa (Campañas de excavación de 1987 y 1988.

    Directory of Open Access Journals (Sweden)

    Trinidad de Torres Perezhidalgo

    1991-01-01

    Full Text Available Se estudia una abundante colección de restos óseos de oso de las cavernas (Ursus spelaeus parvilatipedis n.ssp. procedente de dos campañas de excavación paleontológica (1987 y 1988 llevadas a cabo en la cueva de Troskaeta (Gipuzkoa. El material es analizado métrica, taxonómica, morfológica y tafonómicamente. El trabajo incluye datos geomorfológicos sobre la cavidad.

  4. Evaluation of the 1987-1988 EIA Remedial and Compensatory Program.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia. Office of Research.

    Evaluation of South Carolina's 1987-88 Remedial and Compensatory Program, funded by the state's Education Improvement Act of 1984 (EIA), shows that the program was successful in raising the participants' achievement. The programs include basic skills learning in reading and mathematics in all grades, and writing in grades 6-12, but not all grades…

  5. JAERI tandem, linac and V.D.G. annual report 1987

    International Nuclear Information System (INIS)

    1988-10-01

    This annual report describes research activities which have been performed with the JAERI tandem accelerator, the electron linear accelerator and the Van de Graaff accelerator from April 1, 1987 to March 31, 1988. Summary reports of 49 papers, and list of publications, personnel and cooperative researches with universities are contained. (author)

  6. Exports of petroleum products, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    A summary is presented of exports of motor gasoline, middle distillate, aviation turbine fuel, heavy fuel oil, and partially processed oil from Canada for the 1988 calendar year. A discussion of petroleum product imports is included in order to put exports in the context of the overall trade. Exports of the above petroleum products averaged 32,000 m 3 /d in 1988, up 44% from 1987 levels. Each product except aviation fuel registered increases in export volumes, which reached the highest total volume of the decade. The main reason for the large increase was the first full year of production from the export-directed refinery at Come By Chance, Newfoundland. Export prices for light petroleum products stayed relatively close to USA spot prices. The heavy fuel oil price was mostly above the USA east coast spot price during 1988. Attractive prices on the USA east coast resulted in a few cargoes of middle distillate and motor gasoline shipped from British Columbia. Petroleum products imports came from 12 countries; Quebec had the largest volume of imports in 1988. The USA remained Canada's largest trading partner in petroleum products. Western exporters view the Far East as an ongoing important market. The top single exporter in Canada was Newfoundland Processing, with 32% of the total export volume. 12 figs., 3 tabs

  7. Changes in the diet in the Netherlands: 1987-88 to 1992

    NARCIS (Netherlands)

    Löwik, M.R.H.; Hulshof, K.F.A.M.; Heijden, L.J.M. van der; Brussaard, J.H.; Burema, J.; Kistemaker, C.; Vries, P.J.F. de

    1998-01-01

    From April 1987-March 1988, the first Dutch National Food Consumption Survey (DNFCS) was carried out among 2203 households comprising 5898 subjects, aged 1-85. In 1992 (January-December) the second DNFCS was conducted among 6218 subjects, aged 1-92 belonging to 2475 households. In both surveys,

  8. Occupational radiation exposures at PWR type reactors: international comparison of some global indicators between 1975 and 1988

    International Nuclear Information System (INIS)

    Benedittini, M.; Tabare, M.

    1989-12-01

    This report presents occupational radiation exposures at PWRs for 1988 in eight countries, i.e. Belgium, Federal Republic of Germany, Finland, France, Japan, Sweden, Switzerland, United-States. It updates the CEPN report no 145 which covered the 1975-1987 period. Only reactors in commercial operation since july 1974 are included in the analysis. As for the previous years, there is a general decrease of the mean annual collective dose per reactor: 2.42 man-Sv per reactor in 1988, while it was 2.56 man-Sv in 1987 and 2.83 man-Sv in 1986. The most important reduction concerns the US reactors (46% decrease since 1982) and those of the Federal Republic of Germany (49% decrease since 1981). This general trend is closely related to the dose reduction programs adopted in countries, combined with the positive impact of the past experience. However, despite this tendency, one may note a small increase of the collective occupational exposure for four out of the eight countries during the 1987-1988 period. The gap between lower and higher values is also continuously reducing: from respectively 0.67 man-Sv (Finland) and 3.66 man-Sv (US) in 1987 (factor of 5.5), to 0.88 man-Sv and 3.08 man-Sv in 1988 (factor of 3.5). Excluding Finland, the difference is reduced to a factor 2. These results show a clear tendency towards an uniformization of practices and operations. Annual collective dose results presented as a function of the number of operating years confirm previous results: for all units, a first period with a collective doses increase, followed by a relative stability or even a reduction, and then for some of them, a second increase. In 1988, the average annual collective dose per reactor for all PWRs is about 1.27 man-Sv after one operating year, 2.58 man-Sv after three years, and respectively 4.16, 3.86 and 3.96 man-Sv after seven, ten and fourteen years [fr

  9. Anthropometric Survey of U.S. Army Personnel: Pilot Summary Statistics, 1988

    Science.gov (United States)

    1991-07-01

    ppuilation it purports to represent. It was apparent in the mid-eighties that the Army’s ai~thropcmetric data base had serious deficiencies that...1987-1988 to correct these deficiencies . The goal of the 1988 Anthropcmetric Survey was to acquire a large body of data fzom comparably measured males...2ol w;t-h -&-2 th- -3- lying on tlhe f.i-r- tk2 .rl u.f the fcrz:firrjcr is callcultxi -a- folicý,r;: lV’RTS?-7..WrAI tElJF~j, fThEll plus - ST- U

  10. Analytical Chemistry Laboratory: Progress report for FY 1988

    International Nuclear Information System (INIS)

    Green, D.W.; Heinrich, R.R.; Graczyk, D.G.; Lindahl, P.C.; Erickson, M.D.

    1988-12-01

    The purpose of this report is to summarize the activities of the Analytical Chemistry Laboratory (ACL) at Argonne National Laboratory (ANL) for fiscal year 1988 (October 1987 through September 1988). The Analytical Chemistry Laboratory is a full-cost recovery service center, with the primary mission of providing a broad range of analytical chemistry support services to the scientific and engineering programs at ANL. In addition, the ACL conducts a research program in analytical chemistry, works on instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL handles a wide range of analytical problems, from routine standard analyses to unique problems that require significant development of methods and techniques

  11. Analytical Chemistry Laboratory: Progress report for FY 1988

    Energy Technology Data Exchange (ETDEWEB)

    Green, D.W.; Heinrich, R.R.; Graczyk, D.G.; Lindahl, P.C.; Erickson, M.D.

    1988-12-01

    The purpose of this report is to summarize the activities of the Analytical Chemistry Laboratory (ACL) at Argonne National Laboratory (ANL) for fiscal year 1988 (October 1987 through September 1988). The Analytical Chemistry Laboratory is a full-cost recovery service center, with the primary mission of providing a broad range of analytical chemistry support services to the scientific and engineering programs at ANL. In addition, the ACL conducts a research program in analytical chemistry, works on instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL handles a wide range of analytical problems, from routine standard analyses to unique problems that require significant development of methods and techniques.

  12. Overreaction or Fundamentals: Some Lessons from Insiders' Response to the Market Crash of 1987.

    OpenAIRE

    Seyhun, H Nejat

    1990-01-01

    This paper shows that the 1987 crash was a surprise to corporate insiders; insiders became buyers of stock in record numbers immediately following the crash; stocks that declined more during the crash were also purchased more by insiders; and stocks that were purchased more extensively by insiders during October 1987 showed larger positive returns in 1988. The overall evidence suggests that overreaction was an important part of the crash. Copyright 1990 by American Finance Association.

  13. Brine Sampling and Evaluation Program: 1988 report

    International Nuclear Information System (INIS)

    Deal, D.E.; Abitz, R.J.; Case, J.B.; Crawley, M.E.; Deshler, R.M.; Drez, P.E.; Givens, C.A.; King, R.B.; Myers, J.; Pietz, J.M.; Roggenthen, W.M.; Tyburski, J.R.; Belski, D.S.; Niou, S.; Wallace, M.G.

    1989-12-01

    The data presented in this report are the result of Brine Sampling and Evaluation Program (BSEP) activities at the Waste Isolation Pilot Plant (WIPP) during 1988. These activities, which are a continuation and update of studies that began in 1982 as part of the Site Validation Program, were formalized as the BSEP in 1985 to document and investigate the origins, hydraulic characteristics, extent, and composition of brine occurrences in the Permian Salado Formation, and seepage of that brine into the excavations at the WIPP. Previous BSEP reports (Deal and Case, 1987; Deal and others, 1987) described the results of ongoing activities that monitor brine inflow into boreholes in the facility, moisture content of the Salado Formation, brine geochemistry, and brine weeps and crusts. The information provided in this report updates past work and describes progress made during the calendar year 1988. During 1988, BSEP activities focused on four major areas to describe and quantify brine activity: (1) monitoring of brine inflow parameters, e.g., measuring brines recovered from holes drilled upward from the underground drifts (upholes), downward from the underground drifts (downholes), and near-horizontal holes; (2) characterizing the brine, e.g., the geochemistry of the brine and the presence of bacteria and their possible interactions with experiments and operations; (3) characterizing formation properties associated with the occurrence of brine; e.g., determining the water content of various geologic units, examining these units in boreholes using a video camera system, and measuring their resistivity (conductivity); and (4) modeling to examine the interaction of salt deformation near the workings and brine seepage through the deforming salt. 77 refs., 48 figs., 32 tabs

  14. National Register of research projects, 1986/1987: Part 3, Human sciences: Social sciences. Nasionale Register van navorsingsprojekte, 1986/1987: Deel III, Geesteswetenskappe: Sosiale wetenskappe

    Energy Technology Data Exchange (ETDEWEB)

    1988-08-01

    This Register is intended to serve as a source of information on research which is being conducted in all fields (both natural and human sciences) in the Republic of South Africa. New and current research projects that were commenced or modified during 1986--1987, on which information was received by the compilers until January 1988, are included, with the exception of confidential projects.

  15. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  16. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  17. Columbia River pathway report

    International Nuclear Information System (INIS)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab

  18. Surface water leakage, sedimentation and evaporation in arid regions: A case study of the Gargar dam, Algeria

    Directory of Open Access Journals (Sweden)

    Hassen Benfetta

    2017-12-01

    Full Text Available This study was carried out in order to assess the total capacity loss in Gargar dam, third-largest in Algeria, due to the mudding of the reservoir, intense evaporation and water leaks. We analysed the variation in leakage as a function of the reservoir level, and quantify losses due to leaks, sedimentation and evaporation. We relied on site visits and data obtained from the Algerian Agency for Dams and Transfers to assess the leakage volume; reservoir level; sedimentation and evaporation levels for the period 1988–2015. We present an updated report of this problem through the dam. We estimated total average losses of 23 million m3·year−1 for the period 1988–2015, made up of leakage (0.3 million m3·year−1, evaporation (18 million m3·year−1 and dead storage for 4.6 million m3·year−1. However, total losses for 2004 were estimated at 113.9 million m3, which increased to the alarming value of 166.8 million m3 in 2015. We suggest improving the waterproofness by a concrete screen, and reducing mudding and evaporation by reforestation, to increase the storage capacity of the dam.

  19. JPRS Report, Soviet Union KOMMUNIST No 3, February 1988.

    Science.gov (United States)

    1988-05-02

    maternal caress, something very personal and eternal. JPRS-UKO-88-008 2 May 1988 But when the heart is torn by bitterness, hurt and hatred, as in...34power" and authoritative management methods? In 1987 200 people telephoned the ispolkom in answer to the invitation to participate in discussing the...with equal enthusiasm he fought intuitivism, con- sidering it the foundation and justification of dogmatic and authoritarian thinking. We can

  20. New Law on Nuclear Energy into force on March 1, 1988

    International Nuclear Information System (INIS)

    Santaholma, J.

    1988-01-01

    In Finland new Law on Nuclear Energy enters into force on March 1, 1988 after ten years' preparation work. The Parliament approved the new law, compensating the old law on atomic energy on 1957, unanimously in November 1987. The new law provides the decisions on new nuclear power plants to be made by the Government and finally ratified by the Parliament

  1. Draft 1988 mission plan amendment

    International Nuclear Information System (INIS)

    1988-06-01

    This draft 1988 amendment to the Mission Plan for the Civilian Radioactive Waste Management Program has been prepared by the US Department of Energy (DOE). The purpose is to inform the Congress of the DOE's plans for implementing the provisions of the Nuclear Waste Policy Amendments Act of 1987 (P.L. 100-203) for the Civilian Radioactive Waste Management Program. This document is being submitted in draft form to Federal agencies, states, previously affected Indian Tribes, affected units of local government, and the public. After the consideration of comments, this amendment will be revised as appropriate and submitted to the Congress. 39 refs., 7 figs., 4 tabs

  2. Environmental design of the Olympic Dam operations

    International Nuclear Information System (INIS)

    Middleton, B.A.

    1989-01-01

    Environmental Design of The Olympic Dam Operations has been required to take into account the Environmental Management Programme as approved by the South Australian Government and radiological protection standards as determined by the Commonwealth of Australia's Code of Practice on Radiation Protection in the Mining and Milling of Radioactive Ores 1987. The article describes the natural environment, project assessment and infrastructure relating to the environmental design. The radiological standards refer to the control of exposure to radiation above naturally occurring background levels both for employees and for members of the public. 2 tabs., maps

  3. Uranium Mill Tailings Remedial Action Amendments Act of 1988. Introduced in the Senate, One Hundredth Congress, Second Session, Report 100-543, September 23, 1988

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The Committee on Energy and Natural Resources reported favorably on the Uranium Mill Tailings Remedial Action Amendments Act of 1987 (S.1991) with some amendments, the principal one being to change the 1987 date to 1988. The purpose of this bill is to authorize the Secretary of the Interior to transfer lands under the jurisdiction of the Bureau of Land Management to the Department of Energy for permanent surveillance and maintenance of remediated mill tailings as required by the Uranium Mill Tailings Radiation Control Act of 1978. The bill also extends the authority of the Secretary of Energy to perform remedial action at designated uranium mill tailings sites and vicinity properties until 30 September 1994. The authority to perform groundwater restoration activities is extended without limitation

  4. Report on the material committee meetings in fiscal 1987; 1987 nendo zairyo iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The material committee has held two meetings in this fiscal year. The first committee meeting (September 25, 1987) was held for the major agenda of (1) the development of a centrifugal slurry pump for liquefaction plants, and as the research and development in fiscal 1987, the in-plant tests on new materials and the development a let-down valve, which were reported and deliberated. The major agenda of the second committee meeting (February 24, 1988) were, as the summarized achievements in fiscal 1987, (2) development of a technology to manufacture hydrogen by utilizing coal, (3) in-plant tests on new materials, and (4) development of a let-down valve, which were reported and deliberated. In Item (1), wear in the shaft seal of the centrifugal slurry pump was discussed regarding its cause from the result of a contraction flow test. In Item (2), it was verified that picrochloromite and chromia are integrated as an electromelting aggregate for the atmospheric stability of refractories used in a gasification furnace, and that the test conditions for the refractories call for the refractories to be tested under severe conditions. In Item (3), how to proceed the tests in the future was verified on such items as corrosion patterns, tested materials, coal types, and the degree of corrosion. In Item (4), kinds and temperatures were verified on slurries used in the water-slurry wear test and the fretting corrosion test. (NEDO)

  5. Olympic Dam Operations

    International Nuclear Information System (INIS)

    Crew, R.J.

    1992-01-01

    The Olympic Dam copper-uranium-gold-silver deposit in South Australia was discovered in 1975. The Mine is located 520 kilometres NNW of Adelaide, in South Australia. Following a six year period of intensive investigation and assessment of all the aspects required for the development of the deposit, the Joint Venturers decided in December, 1985, to proceed with the project. Milling of ore commenced in June 1988 and final products are cathode copper, uranium ore concentrate (yellow cake), and refined gold and silver. Anticipated production, from treating approximately 1.5 million tonnes of ore, in normal production years, is expected to be 45,000 tonnes of copper, 1,600 tonnes of yellow cake (1350 tonnes of Uranium), 25,000 ounces of gold and 500,000 ounces of silver. (orig./HP) [de

  6. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater

  7. Solar-Geophysical Data Number 521, January 1988. Part 2 (comprehensive reports). Data for July 1987, and miscellanea

    International Nuclear Information System (INIS)

    Coffey, H.E.; McKinnon, J.A.

    1988-01-01

    Contents include: Detailed index for 1987; Data for July 1987--(Meudon Carte Synoptique, Solar flares, Solar radio bursts at fixed frequencies, Solar x-ray radiation from GOES satellite, Mass ejections from the sun, Active prominences and filaments); Miscellaneous data--Solar x-ray flare events May-December 1984

  8. 1988 Pilot Institute on Global Change on trace gases and the biosphere

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, J.A.; Moore, B. III

    1998-07-01

    This proposal seeks multi-agency funding to conduct an international, multidisciplinary 1988 Pilot Institute on Global Change to take place from August 7 through 21, 1988, on the topic: Trace Gases and the Biosphere. The institute, to be held in Snowmass, Colorado, is envisioned as a pilot version of a continuing series of institutes on Global Change (IGC). This proposal seeks support for the 1988 pilot institute only. The concept and structure for the continuing series, and the definition of the 1988 pilot institute, were developed at an intensive and multidisciplinary Summer Institute Planning Meeting in Boulder, Colorado, on August 24--25, 1987. The theme for the 1988 PIGC, Trace Gases and the Biosphere, will focus a concerted, high-level multidisciplinary effort on a scientific problem central to the Global Change Program. Dramatic year-to-year increases in the global concentrations of radiatively-active trace gases such as methane and carbon dioxide are now well documented. The predicted climatic effects of these changes lend special urgency to efforts to study the biospheric sources and sinks of these gases and to clarify their interactions and role in the geosphere-biosphere system.

  9. Identification of the Spawning, Rearing, and Migratory Requirements of Fall Chinook Salmon in the Columbia River Basin, Annual Report 1993.

    Energy Technology Data Exchange (ETDEWEB)

    Rondorf, Dennis W.; Tiffan, Kenneth F.

    1994-12-01

    Recovery efforts for the endangered fall chinook salmon necessitates knowledge of the factors limiting the various life history stages. This study attempts to identify those physical and biological factors which affect spawning of the fish in the free-flowing Snake River and their rearing seward migration through Columbia River basin reservoirs. The spawning was generally a November event in 1993, with some activity in late Oct. and early Dec. Spawning habitat availability was assessed by applying hydraulic and habitat models to known fall chinook salmon spawning sites. Juveniles were seined and PIT tagged in the free-flowing Snake River, and in the Columbia River in he Hanford Reach and in McNary Reservoir. Subyearling fish were marked at McNary Dam to relate river flow and migration patterns of juveniles to adult returns. Hydroacoustic surveys were conducted on McNary and John Day reservoirs and in net pens.

  10. Valuating report on radionuclide concentrations in the waste water and mixed slurry from the Vienna main clarifying plant for 1988

    International Nuclear Information System (INIS)

    Henrich, E.; Weisz, J.; Zapletal, M.; Haider, W.

    1989-03-01

    Sample preparation- and measuring methods, and results on 16 nuclides from the Vienna clarifying plant for 1988 are presented. Comparisons with the 1987 values are made and hypotheses about the sources of radionuclides - natural, atmospheric atomic weapons tests, Chernobyl accident and medical applications - are presented. An estimation of the activity transferred to the surface waters (Danube) over 1988 is also made. 16 refs., 8 figs., 6 tabs. (qui)

  11. Current meter data from moored current meter casts in the TOGA Area - Pacific (30 N to 30 S) as part of the Equatorial Pacific Ocean Climate Studies (EPOCS) project from 1987-05-01 to 1987-05-05 (NODC Accession 9000211)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Current meter data were collected using moored current meter casts in the TOGA Area - Pacific (30 N to 30 S) from 01 May 1987 to 06 August 1988. Data were submitted...

  12. System-Wide Significance of Predation on Juvenile Salmonids in Columbia and Snake River Reservoirs : Annual Report 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.; Poe, Thomas P.

    1993-12-01

    Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which were salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.

  13. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  14. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  15. Report on the separation and refining technology sub-committee meetings in fiscal 1987; 1987 nendo bunri seisei gijutsu bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The separation and refining technology sub-committee has held two meetings in this fiscal year. The first sub-committee meeting (October 9, 1987) was held for the major agenda of the research and development of the basic studies; as the summary of the achievements in fiscal 1986, the up-grading by fractions and of the total fraction collectively, up-grading of kerosene and light oil fractions, up-grading of medium to heavy fractions; and as the study plans for fiscal 1987, the up-grading of coal liquefied oil, a technology to separate hetero compounds, development of their applications, and the reports and deliberations thereon. The major agenda of the second sub-committee meeting (February 10, 1988) were the interim report on the achievements in research of up-grading the coal liquefied oil in fiscal 1987, the interim reports on research achievements in the technology to separate hetero compounds and development of its applications, and the reports and deliberations thereon. The conventional up-grading sub-committee was dissolved in fiscal 1987 to form a new organization, whereas the 'separation and refining sub-committee' was founded newly. With respect to the up-grading matters, reports were given on the achievements thereon as a result of using a micro reaction device and a bench reaction device as in the past, and on the achievements in the application development. In addition, on the hetero related matters, directionality of the survey and the result therefrom were reported. (NEDO)

  16. Non-accelerator particle physics: Progress report, February 1, 1987-January 31, 1988

    International Nuclear Information System (INIS)

    Steinberg, R.I.

    1988-01-01

    The goals of this research are the experimental testing of fundamental theories of physics such as grand unification and the exploration of cosmic phenomena through the techniques of particle physics. We are currently engaged in construction of the MACRO detector, an Italian-American collaborative research instrument with a total particle acceptance of 12,000 m 2 sr, which will perform a sensitive search for magnetic monopoles using excitation-ionization methods. Other major objectives of the MACRO experiment are to search for astrophysical high energy neutrinos expected to be emitted by such objects as Vela X-1, LMC X-4 and SN-1987A and to search for low energy neutrino bursts from gravitational stellar collapse. The past year has seen major progress in our program of liquid scintillator development. We now have an advanced scintillator formulation whose figure-of-merit for use in long counters (such as the MACRO counters) is double that of the previous best scintillator. The new formulation promises to enhance substantially the physics potential of the MACRO detector. Dr. Charles Lane (Ph.D. 1987, Caltech)l has now joined our group, resulting in significant expansion of our responsibilities on the MACRO experiment. We are now leaders of the American effort to develop the off-line data analysis for MACRO

  17. Multichannel Seismic Reflection Data - SCAR - Ross Sea 1987-1988, SDLS CD-ROM vol 2

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data are stacked multichannel marine seismic reflection data from six lines recorded during 1988 in the Ross Sea, Antarctica, by the Bundesanstalt fur...

  18. Energy management in the budget proposal for the year 1988

    International Nuclear Information System (INIS)

    Salminen, P.

    1987-01-01

    In the item 32.55 of the state budget proposal for the year 1988 the total amount of FIM 182 million has been reserved for energy management. This is over FIM 10 million less than the corresponding appropriation in 1987. In addition to this direct financing the state promotes and develops the Finnish energy management indirectly e.g. through energy research funded by the Technical Research Centre of Finland. In the article the use of the appropriation is described

  19. Spent fuel storage requirements, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    Historical inventories of spent fuel and Department of Energy (DOE) estimates of future discharges from US commercial nuclear reactors are presented for the next 20 years, through the year 2007. The eventual needs for additional spent fuel storage capacity are estimated. These estimates are based on the maximum capacities within current and planned at-reactor facilities and on any planned transshipments of fuel to other reactors or facilities. Historical data through December 1987 and projected discharges through the end of reactor life are used in this analysis. The source data was supplied by the utilities to DOE through the 1988 RW-859 data survey and by DOE estimates of future nuclear capacity, generation, and spent fuel discharges. 12 refs., 3 figs., 28 tabs

  20. Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1990-1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1991-09-01

    We report on our effort from April 1990 to March 1991 to describe the life history and population dynamics of white sturgeon Acipenser transmontanus in.John Day Reservoir. We set 1188 set lines and 26 gill nets. We caught 623 white sturgeon with set lines and 236 with gill nets. Catch per unit effort was much higher in areas near the tailrace than in downstream sites. Our setlines were size selective. We recaptured 3 fish released in John Day Reservoir in 1989 and 28 fish released in 1990. Sport and commercial fishermen recovered 62 tags from fish we tagged in Bonneville, The Dalles and John Day reservoirs, 1987-1990. We observed extensive movements of marked sturgeon within the reservoirs. We completed aging of available samples from all three reservoirs from 1987-1990. We aged fish as old as 46 years. Bone marks were observed on 74 of 78 fish previously injected with oxytetracycline and annulus formation was generally complete after June. We estimated parameters in a length-weight equation. About 1.5% of the female white sturgeon we examined to date had early or late vitellogenic eggs and would be expected to spawn the following year.

  1. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  2. What can be learned from the Simonette flood of August 1987?

    International Nuclear Information System (INIS)

    Rodman, R.F.

    1991-01-01

    The 1987 Simonette flood in Alberta was of unprecedented magnitude. It has been estimated as a 300- to 500-year return period event. Approximately 220 mm of precipitation fell over the 5,050 km 2 area in a day and a half, with 85% falling in a 24 hour period. The Streamflow Synthesis and Reservoir Regulation (SSARR) rainfall-runoff model of the U.S. Army Corps of Engineers, was used to try to simulate the flood. It was concluded that the flood could not be modelled because cascading debris dams and a landslide modified the rainfall-runoff hydrograph. Physical processes such as debris dams and landslides should be allowed for when selecting design events in hydrotechnical engineering. Sound engineering judgement must be applied on a case-by-case specific basis to justify this additional design allowance. 11 refs., 5 figs., 1 tab

  3. Accidents and troubles in nuclear fuel facilities in fiscal year 1987

    International Nuclear Information System (INIS)

    1988-01-01

    The number of the accidents and troubles reported in fiscal year 1987 in relation to nuclear fuel facilities based on the stipulation of the law on the regulation of nuclear raw materials, nuclear fuel materials and nuclear reactors was two. In Tokai Works, Power Reactor and Nuclear Fuel Development Corp., on September 17, 1987, the conveyor for transporting spent fuel in the separation and refining shop of the reprocessing plant broke down, consequently, the operation of the reprocessing plant was stopped for about five months. In Tokai Testing Works, Mitsubishi Heavy Industries Ltd., on February 7, 1988, a worker who was putting up posters in the control area of the uranium experiment facilities fell from a stepladder, and required treatment by entering a hospital for about one month, suffering bone fracture. (K.I.)

  4. Perfecting the Partnership: Revitalising the Maori Language in New Zealand Education and Society 1987-2014

    Science.gov (United States)

    Benton, Richard A.

    2015-01-01

    This paper looks at aspects of Maori language revitalisation since the passage of the Maori Language Act, 1987 which gave official status to the language. It is a sequel to an article on Maori language in education published in this journal the following year [Benton, R. A. (1988). "The Maori language in New Zealand education."…

  5. Nuclear structure studies using the high resolution spectrometer at the Los Alamos Clinton P. Anderson Meson Physics Facility: Annual progress report, [1987-1988

    International Nuclear Information System (INIS)

    1987-09-01

    This document constitutes the (1987 to 1988) progress report for the ongoing medium energy nuclear physics research program supported by the US Department of Energy with the University of Texas at Austin. A major part of the work has been and will continue to be associated with research done at the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF) using the High Resolution Spectrometer (HRS), the External Proton Beam (EPB), and the new Neutron Time of Flight Facility (NTOF). Other research is done at the Fermi National Accelerator Laboratory (FNAL). The research focuses on (1) providing proton + nucleus data which test nonrelativistic and relativistic models of the medium energy proton + nucleus interaction, (2) providing (p,p) and (p,n) data which are to be analyzed to provide new nuclear structure information (both ground state and excited state), (3) providing nucleon + nucleon data to aid in the systematic study of the fundamental nucleon-nucleon interaction, (4) developing and improving the proton + nucleus theoretical models themselves, and (5) initiating new experimental programs whose goals are to search for new phenomena in nuclear physics. 182 refs., 71 figs., 5 tabs

  6. US Department of Energy radioisotope customers with summary of radioisotope shipments, FY 1988

    International Nuclear Information System (INIS)

    Van Houten, N.C.

    1989-06-01

    Pacific Northwest Laboratory (PNL) prepared this edition of the radioisotope customer list at the request of the Office of Health and Environmental Research (ER-73), Office of Energy Research, US Department of Energy (DOE). This is the 25th report in a series dating from 1964. This report covers DOE radioisotope sales and distribution activities by its facilities to domestic, foreign and other DOE facilities for FY 1988. The report is divided into five sections: radioisotope suppliers, facility contacts, and radioisotopes or services supplied; a list of customers, suppliers, and radioisotopes purchased; a list of radioisotopes purchased cross-referenced to customer numbers; geographic locations of radioisotope customers; and radioisotope sales and transfers -- FY 1988. Radioisotopes not previously reported in this series of reports were argon-37, arsenic-72, arsenic-73, bismuth-207, gadolinium-151, rhenium-188, rhodium-101, selenium-72, xenon-123 and zirconium-88. The total value of DOE radioisotope sales for FY 1988 was $11.1 million, an increase of 3% from FY 1987

  7. US Department of Energy radioisotope customers with summary of radioisotope shipments, FY 1988

    Energy Technology Data Exchange (ETDEWEB)

    Van Houten, N.C.

    1989-06-01

    Pacific Northwest Laboratory (PNL) prepared this edition of the radioisotope customer list at the request of the Office of Health and Environmental Research (ER-73), Office of Energy Research, US Department of Energy (DOE). This is the 25th report in a series dating from 1964. This report covers DOE radioisotope sales and distribution activities by its facilities to domestic, foreign and other DOE facilities for FY 1988. The report is divided into five sections: radioisotope suppliers, facility contacts, and radioisotopes or services supplied; a list of customers, suppliers, and radioisotopes purchased; a list of radioisotopes purchased cross-referenced to customer numbers; geographic locations of radioisotope customers; and radioisotope sales and transfers -- FY 1988. Radioisotopes not previously reported in this series of reports were argon-37, arsenic-72, arsenic-73, bismuth-207, gadolinium-151, rhenium-188, rhodium-101, selenium-72, xenon-123 and zirconium-88. The total value of DOE radioisotope sales for FY 1988 was $11.1 million, an increase of 3% from FY 1987.

  8. Earthworm populations in soils contaminated by the Chernobyl atomic power station accident, 1986-1988

    International Nuclear Information System (INIS)

    Krivolutzkii, D.A.; Pokarzhevskii, A.D.; Viktorov, A.G.

    1992-01-01

    A study of earthworm populations in the 30 km zone around the Chernobyl atomic power station was carried out in 1986-1988. Significant differences in earthworm population numbers were found between highly contaminated and control plots in summer and autumn 1986 and in April 1987. But in the autumn of 1988 the earthworm population numbers in contaminated plots were higher than in the control plots. The ratio of mature to immature specimens was higher in 1986 in the contaminated plots in comparison with the control plots. Only one species of earthworms, Dendrobaena octahedra, was found in contaminated forest plots during the first 2 yr following the accident but in the control forest plots Apporectodea caliginosa was also found. (author)

  9. Annual report of the Japan Atomic Energy Research Institute, Apr. 1987 - Mar. 1988

    International Nuclear Information System (INIS)

    1988-01-01

    In fiscal 1987, the Atomic Energy Commission of Japan revised the 'Long term program for development and utilization of nuclear energy', which is done every five years. It determined the future direction of the research and development in JAERI. Three basic objectives are indicated in it, that is, to qualitatively upgrade nuclear technology, to tackle the frontiers of the technology, and to promote international collaboration. The new 'Long term task plan' of JAERI based on the 'Long term program' was established in August, 1987. The integral experiment on loss of coolant accident, the test on reactivity-initiated accident, the irradiation and post-irradiation examination of fuel, the development of safety analysis codes, the design and safety analysis of the Nuclear Fuel Cycle Safety Engineering Research Facility, the treatment and disposal of radioactive wastes, the preparatory work for constructing the High Temperature Engineering Test Reactor, the full scale plasma heating experiment with JT-60, the study on high efficiency confinement mode and current drive, the construction of the new home port for the nuclear ship 'Mutsu', the design of an advanced marine reactor, the reactor physics of FBRs and ATRs and other fundamental studies, and the operation of JRR-2, JRR-4 and JMTR are reported. (K.I.)

  10. Report on the Results of the 1988 Survey of Former Biomedical Engineering Technology Students. Research Report Number 56.

    Science.gov (United States)

    Livieratos, Barbara B.

    In spring 1988, a telephone survey was conducted of students who had been enrolled in Howard Community College's (HCC's) Biomedical Engineering Technology (BMET) program between 1972 and 1987. The study sought to gather information for future student recruitment and program planning efforts. Responses were obtained from 43 (35%) of a potential…

  11. Olympic Dam - the first decade

    International Nuclear Information System (INIS)

    Newton, A.W.; Wilson, M.A.; Harris, J.

    1988-01-01

    Most aspects of the pre-production phase of the Olympic Dam Project, from commencement of exploration in May 1975 through to commitment to development in December 1985 are documented here. The discovery by Western Mining Corporation Ltd of copper mineralisation on Roxby Downs Station in July 1975 has led to one of the more intensive base-metal exploration programmes undertaken in Australia. Comprehensive exploration, evaluation and feasibility studies between 1975 and 1985 have delineated a probable 450 million tonnes of higher grade ore containing 2.5% copper, 0.8 kg/t uranium oxide, 0.6 g/t gold and 6.0 g/t silver. The total resource is estimated at 2 billion tonnes containing 1.6% copper, 0.6 kg/t uranium oxide, 0.6 g/t gold and 3.5 g/t silver. At 31 December 1985, over 540 km of surface and underground drilling had been completed, comprising over 700 surface drillholes totalling 234 km of core and 218 km of open-hole drilling, and about 900 underground diamond-drillholes totalling 90 km. The Whenan Shaft had been sunk to 500 m and driving on three levels totalled almost 10 km. More than one million tonnes of ore and mullock were raised during development. A pilot treatment plant commissioned on site produced concentrates, matte and blister copper, and ammonium diuranate. Following a technical study of the Olympic Dam Project, completed in March 1985, and a subsequent economic feasibility study, it was announced on 11 June 1985 that the initial project was considered to be commercially viable. On 8 December 1985, the joint venturers, Western Mining Corporation Holdings Ltd (51%) and the BP Group (49%), announced their commitment to the Project. An appendix lists the important events that occurred between January 1986 and December 1987 in bringing Olympic Dam to the production state. 26 refs., 17 figs., 5 tabs., ills

  12. US Army Institute of Surgical Research Annual Research Progress Report for Fiscal Year 1988

    Science.gov (United States)

    1988-10-01

    ANGIOTENSIN ANALOGUES ......................................... 273 Takeshi Shimazu, MD; Hisashi Ikeuchi, MD; Robert C. Allen, MD, PhD; Gene B. Hubbard, DVM...malnourished animals. Surgery 96:308-14, 1984. 14. Jaffe BM, LaRosa CA, and Kimura K: Prostaglandins and surgical diseases. Curr Prob Surg 25:679-706...SAN ANTONIO, TEXAS 78234-5012 1 October 1987 - 30 September 1988 INVESTIGATORS Takeshi Shimazu, MD Hisashi Ikeuchi, MD Robert C. Allen, MD, PhD Gene

  13. Yucca Mountain Project bibliography, January--June 1988: An update: Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Tamura, A.T.; Lorenz, J.J.

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations Project was renamed the Yucca Mountain Project on August 5, 1988. This update contains information that was added to the DOE Energy Data Base during the first six months of 1988. The update is categorized by principal project participating organizations, and items are arranged in chronological order. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Previous information on this project can be found in the Nevada Nuclear Waste Storage Investigations bibliographies, DOE/TIC-3406 which covers the years 1977--1985, and DOE/OSTI-3406(Suppl.1) which covers 1986 and 1987. These bibliographies contain indexes for Corporate Author, Personal Author, Subject, Contract Number, Report Number, Order Number Correlation and Key Word in Context

  14. Evaluation of the 1996 predictions of the run-timing of wild migrant spring/summer yearling chinook in the Snake River Basin using Program RealTime

    International Nuclear Information System (INIS)

    Townsend, R.L.; Yasuda, D.; Skalski, J.R.

    1997-03-01

    This report is a post-season analysis of the accuracy of the 1996 predictions from the program RealTime. Observed 1996 migration data collected at Lower Granite Dam were compared to the predictions made by RealTime for the spring outmigration of wild spring/summer chinook. Appendix A displays the graphical reports of the RealTime program that were interactively accessible via the World Wide Web during the 1996 migration season. Final reports are available at address http://www.cqs.washington.edu/crisprt/. The CRISP model incorporated the predictions of the run status to move the timing forecasts further down the Snake River to Little Goose, Lower Monumental and McNary Dams. An analysis of the dams below Lower Granite Dam is available separately

  15. Instruction No. 3/1988, 1 June 1988.

    Science.gov (United States)

    1988-01-01

    This Instruction contains provisions relating to the injury and maltreatment of children and women and the enforcement of support payments to women and children. With respect to the maltreatment of children, it provides that the Spanish Office of the Public Prosecutor shall a) curb child abuse; b) take decisive action to protect minors who have been abused or are helpless and to execute the new responsibilities imposed by Law 21/1987 of November 11, which modifies the Civil Code with respect to adoption; and c) collect the necessary data with regard to felonies or misdemeanors that involve child abuse so as to allow for the compilation of annual statistics which may identify the magnitude of this problem; With respect to the maltreatment of women, the prosecutor shall a) curb the abuse of women, investigating those cases where a lack of evidence exists because women are afraid; and b) collect the necessary data with regard to felonies or misdemeanors that involve the abuse of women so as to allow for the compilation of annual statistics which may identify the social reality of this problem. With respect to support payments, the Instruction urges all prosecutors to monitor the execution of support payments using all judicial means authorized, including penal actions when applicable, or enforcement mechanisms which have been mentioned in this memo, that is, conditioning visitation rights on timely payment of the support established for food and education of the children. In Circular No. 32 of 15 April 1988, the National Directorate of Police is called on to provide all necessary police assistance to women who have been the object of illegitimate acts of force so that they can report such acts and to inform women of laws designed to help them and the means of availing themselves of these laws. See Anuario de Derecho Penal y Ciencias Penales, Vol. 41, No. 3, September-December 1988, p. 978. full text

  16. Yucca Mountain Project bibliography, July--December 1988: An update: Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Tamura, A.T.; Lorenz, J.J.

    1989-04-01

    This update contains information on the Yucca Mountain Project that was added to the Energy Data Base during the last six months of 1988. The update also includes a new section which provides information about publications on the Energy Data Base that were not sponsored by the project but have some relevance to it. This section covers the period 1977 to 1988. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. The update is categorized by principal project participating organizations, and items are arranged in chronological order. Participant-sponsored subcontractor reports, meeting papers, and journal articles are included with sponsoring organization. Previous information on this project can be found in the Nevada Nuclear Waste Storage Investigations bibliographies: DOE/TIC-3406, which covers the years 1977 to 1985; DOE/OSTI-3406(Suppl.1), which covers 1986 and 1987; and the Yucca Mountain Project Bibliography, DOE/OSTI-3406(Suppl.1)(Add. 1), which covers the first six months of 1988. All entries in these publications are searchable on-line on the NNW data base file which can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy

  17. Metal induced embrittlement. Annual report, [March 1, 1987--February 29, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Hoagland, R.G.

    1988-11-01

    This program is investigating the causes of embrittlement that occur in certain solid metals when exposed to liquid metals. The degree of embrittlement varies enormously among different solid/liquid pairs as witness, for example, the modest loss of load carrying, ability induced in carbon steels by Pb or the profound embrittlment of aluminum (particularly high strength) alloys by Hg and Ga. The structure of this study involves two types of activities: an experimental fracture mechanics study of the behavior of certain solid metals in liquid metals, and a theoretical study on an atomic scale of the crack tip deformation and extension behavior by means of atomistic simulation. This research, which began March 1, 1987, has completed its 20 month. A brief synopsis is given of performance in each of the areas of activity during the past year.

  18. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  19. National Radiological Protection Board accounts 1987-88

    International Nuclear Information System (INIS)

    1988-01-01

    The financial objectives for 1987-88 were to fund the technical programme and to increase the working balance to a realistic level in the region of Pound 400K as at 31 March 1988. To achieve these objectives profiled budgets were established and monitored throughout the year for a revenue expenditure programme of Pound 7313K and a capital programme of Pound 749K. To fund the difference between planned expenditure and total grants of Pound 4613K receipts of Pound 3600K were needed after allowing for non-recoverable VAT. In the event all objectives were attained with minor variances on the anticipated planned budget profiles with the net result that Pound 106K was added to the working balance. (author)

  20. Fish Passage Center 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele [Fish Passage Center of the Columbia Basin Fish & Wildlife Authority

    2008-11-25

    The January-July runoff volume above the Dalles Dam in 2007 was 89% of the average runoff volume for the 1971-2000 historical record. The April-July runoff volume at Lower Granite Dam was 68% of the 1971-2000 historical record. Over the 79 year historical record from 1929 through 2007, the 2007 January-July runoff volume at the Dalles was the 50th lowest year out of the 79th year record. The January through July runoff volume at Lower Granite was the 65th lowest runoff year out of 79 on record. This year can be characterized by steadily decreasing snowpack which was below average in the Columbia Basin by the end of April. The combination of runoff volume, decreasing snowpack and reservoir operations resulted in spring migration flows at McNary Dam averaging 239 Kcfs, slightly above the Biological Opinion flow objective of 237 Kcfs. However the spring period migration flows in the Snake River averaged 61 Kcfs at Lower Granite Dam, substantially below the Biological Opinion flow objective of 85 Kcfs. Summer migration period Biological Opinion flow objectives averaged 163 Kcfs at McNary Dam, substantially below the summer flow objective of 200 Kcfs. Summer migration period flows in the Snake River at Lower Granite Dam averaged 29 Kcfs, also substantially below the Biological Opinion flow objective of 50 Kcfs. Overall spring migrants in the Columbia River experienced better migration flows than spring migrants in the Snake River reach. Summer migration flow objectives were not achieved in either the Columbia or Snake rivers. The 2007 FCRPS Operations Agreement represents an expanded and improved spill program that goes beyond the measures contained in the 2004 Biological Opinion. During the spring period, spill now occurs for twenty-four hours per day at all projects, except for John Day Dam where the daily program remains at 12 hours. A summer spill program provides spill at all the fish transportation collector projects (Lower Granite, Little Goose, Lower Monumental

  1. JPRS Report, East Asia, Vietnam: TAP CHI CONG SAN, No. 10, October 1987

    Science.gov (United States)

    1988-02-09

    Followers in the Countries of Latin America [ Tran Anh] 48 JPRS-ATC-88-002 9 February 1988 VIETNAM: TAP CHI CONG SAN No 10, October 1987 [Except...character is not simply an ideological-political category applied in literature. Our party, as Truong Chinh said at the Third National Literature and Art...Hanoi TAP CHI CONG SAN in Vietnamese No 10, Oct 87pp 39-42 [Article by Nguyen Dang Quang, assistant editor-in-chief of GIAO DUC LY LUAN Journal

  2. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  3. Analytical quality control service programme, intercomparison runs, certified reference materials, reference materials 1987-88

    International Nuclear Information System (INIS)

    1986-12-01

    The purpose of the Analytical Quality Control Services (AQCS) programme provided by the IAEA, is to assist laboratories engaged in the analysis of nuclear, environmental, biological, and materials of marine origin for radionuclide, major, minor and trace elements, as well as stable isotopes using atomic and nuclear analytical techniques, to check the quality of their work. The tables give details of the intercomparison samples and reference materials distributed by the IAEA in the period 1987 to 1988. 2 tabs

  4. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, January 1--June 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Baum, J W; Boccio, J L; Diamond, D; Fitzpatrick, R; Ginsberg, T; Greene, G A; Guppy, J G; Hall, R E; Higgins, J C; Weiss, A J [comp.

    1988-12-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through December 31, 1987.

  5. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, January 1--June 30, 1988

    International Nuclear Information System (INIS)

    Baum, J.W.; Boccio, J.L.; Diamond, D.

    1988-12-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through December 31, 1987

  6. Nuclear power in Japan in 1987

    International Nuclear Information System (INIS)

    Molodtsov, S.D.

    1989-01-01

    Data on the development level of nuclear power in Japan as of 1988 beginning are presented. Total registed electric power of 36 nuclear power units under operation constituted 28046 MW. 13 power units with 12268 MW total power are under construction. In 1987 188.4 TWH electric power was generated at the Japanese NPPs, it constituted 31.7% of total electric power generation. About 360 bil. yens were assigned from the state budget to further development of nuclear power engineering. Efforts to create the improved BWR type reactor, as well as, scientific and research efforts on the development of fast breeder reactors, improvement of uranium enrichment and radioactive waste storage are carried out. It is expected that share of nuclear power in electric power generation in Japan will reach 40% to the beginning of the 21-th century

  7. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  8. Status of the flora and fauna on the Nevada Test Site, 1988

    International Nuclear Information System (INIS)

    Hunter, R.B.

    1992-06-01

    In 1987 the US Department of Energy (DOE) initiated a program to monitor the health of the Nevada Test Site (NTS) plants and animals in support of the National Environmental Protection Act. The program, part of DOE's Basic Environmental Compliance and Monitoring Program (BECAMP), monitors perennial and ephemeral plants, the more common species of rodents and lizards, and the horses, deer, raptors and other large animals on the NTS. This is a report of data collected on these flora and fauna for the year 1988, the second year of monitoring

  9. Waste acid detoxification and reclamation: Final Phase II report: Summary of distillation and material degradation tests for FY 1987 and FY 1988

    International Nuclear Information System (INIS)

    Brouns, T.M.; Stewart, T.L.

    1988-11-01

    The objective of the Waste Acid Detoxification and Reclamation project is to develop processes for reducing the volume, quantity, and toxicity of metal-bearing waste acids. The primary incentives for implementing these types of waste minimization processes are regulatory and economic (that is, to meet requirements in the Resource Conservation and Recovery Act and reduce the cost for treatment, storage, and disposal). Two precipitation processes and a distillation process are being developed to minimize waste from fuel fabrication operations or other metal-finishing operations conducted at US Department of Energy Defense Programs (DOE-DP) facilities. Waste process acids such as (1) HF-HNO 3 etch solutions containing Zr as a major metal impurity, and (2) HNO 3 strip solutions containing Cu as a major metal impurity are detoxified and reclaimed by concurrently precipitating heavy metals and regenerating acid for recycle. Acid from a third waste acid stream generated from chemical milling operations is reclaimed by the use of distillation. This stream comprises HNO 3 and H 2 SO 4 containing U as the major metal impurity. Distillation allows NO 3 /sup /minus// to be displaced by SO 4 /sup /minus/2/ in metal salts; free HNO 3 is then vaporized from the U-bearing sulfate stream. In a downstream precipitation step, uranium can be recovered from the sulfate stream. This report summarizes distillation tests and candidate material degradation tests conducted during FY 1987 and FY 1988

  10. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  11. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  12. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.

  13. Radiochemistry Division annual progress report: 1988

    International Nuclear Information System (INIS)

    1990-01-01

    The report covers the research and development (R and D) work carried out by Radiochemistry Division, Bhabha Atomic Research Centre, Bombay during the period 1987-1988. The R and D work is reported in the form of individual summari es grouped under the headings: (1)Actinide Chemistry, (2)Nuclear Chemistry, and (3)Spectroscopy. Some of the highlights of the work are studies on : (a)solvent extraction and complexation behaviour of actinides, (b)helium ion induced fission of 238 U and 165 Ho and fission yield of 252 Cf(sf), (c)separation of rare earths from fission products, (d)positron annihilation spectroscopy of high Tc superconductors, and (e)EPR spectroscopy of high Tc superconductors. Radioanalytical services and radiation sources given to the other Divisions and Organisations are listed. A list of publications and symposia papers by scientists of the Division is also given. 45 figs., 49 tabs

  14. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  15. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  16. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  17. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  18. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  19. Smolt Monitoring Program, Volume II, Migrational Characteristics of Columbia Basin Salmon and Steelhead Trout, 1986 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fish Passage Center

    1987-02-01

    Smolt Monitoring Program Annual Report, 1986, Volume I, describes the results of travel time monitoring and other migrational characteristics of yearling and sub-yearling chinook salmon (Oncorhynchus tshawytscha), sockeye salmon (Oncorhynchus nerka), and steelhead trout (Salmo gairdneri). This volume presents the data from Fish Passage Center freeze brands used in the analysis of travel time for Lewiston, Lower Granite, Lower Monumental, Rock Island, McNary, and John Day dams. Summary of data collection procedures and explanation of data listings are presented in conjunction with the mark recapture data. Data for marked fish not presented in this report will be provided upon request. Daily catch statistics (by species), flow, and sample parameters for the smolt monitoring sites, Clearwater, Lewiston, Lower Granite, Lower Monumental, Rock Island, McNary, John Day, and Bonneville also will be provided upon request.

  20. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  1. Medical follow up of ten patients victims of the radiological accident occurred in Goiania, Goias State, Brazil 1988/1992; Acompanhamento clinico de dez pacientes vitimas do acidente radiologico de Goiania - 1988/1992

    Energy Technology Data Exchange (ETDEWEB)

    Curado, M.P.; Morais, M.S.A.; Silva, J.F.; Assis, P.R.; Oliveira, A.R.; Santos, E.A

    1992-12-31

    The author makes an update of the medical aspects of ten victims of the radiological accident occurred in Goiania in September 1987. These patients received specialized treatment during the critical phase at Marcilio Dias Naval Hospital in Rio de Janeiro. Actually these patients are under medical follow-up at Leide das Neves Ferreira Foundation since march 1988. The clinical, haematological and laboratorial results are presented and discussed. The importance of a close medical follow-up direct victims of a radiological accident is stressed. (author) 13 refs., 5 tabs., 2 graphs.

  2. Review of JT-60 experimental results from June to October, 1988

    International Nuclear Information System (INIS)

    1989-03-01

    After the achievement of AEC (Atomic Energy Commission) milestone in October, 1987, a new divertor coil has been installed to produce divertor plasmas with a single null at the buttom. A pellet injector was also installed during the same shut down period. This report presents the results from the experiment held from June to October in 1988. Major experimental issues during this phase are: 1) confinement and 2) divertor characteristics of lower X-point discharges, 3) enhancement of confinement with pellet injection, 4) ion heating with ICRF of LHRF, 5) current drive with LHRF or ICRF, and evaluation of bootstrap current. (J.P.N.)

  3. Status of National Programmes on Fast Breeder Reactors. International Working Group on Fast Reactors, Twentieth Annual Meeting, Vienna, 24-27 March 1987

    International Nuclear Information System (INIS)

    1987-07-01

    The Agenda of the meeting was as follows: 1. Approval of the Agenda. 2. Approval of the minutes of the 19th meeting of the IWGFR. 3. Report of the Scientific Secretary regarding the WD activities of the Working Group. 4. Presentations and discussions on national programmes on fast breeder reactors. 5. Consideration of conferences on fast breeder reactors. a. ANS-ENS International Conference on Fast Breeder Systems Experience Gained and Path to Economical Power Generation, Richland, Washington, USA, 13-17 September 1987. b. International Conference on Liquid Metal Engineering and Technology, Avignon, France, 17-20 October 1988. c. Other meetings of interest to IWGFR members. 6. Consideration of major recommendations of some of the WD IWGFR Specialists' Meetings. 7. Consideration of arrangements for Specialists' Meetings in 1987. a. Specialists' Meeting on Fission and Corrosion Products Behaviour in Primary Circuits of LMFBRs, Karlsruhe, Fed. Rep. of Germany, May 1987. b. Specialists' Meeting on LMFBR Reactor Block Antiseismic Design and Verification, Bologna, Italy, October 1987. 8. Selection of topics for Specialists' Meetings to be held in 1988 and suggestions of the IWGFR on other Specialists' Meetings and their justifications. 9. Consideration of joint research activities: a. Coordinated Research Programme on a Comparative Assessment of Processing Techniques for Analysis of Sodium Boiling Noise Detection Data. b. Coordinated Research Programme on Intercomparison of LMFBR Core Mechanics Codes. c. New Topics of CRP. d. Other Activities. 10. Updating of ''LMFBR Plant Parameters''. 11. Informal discussion on ''Safety Criteria for Fast Reactors in IWGFR Countries''. 12. The date and place of the 21th Annual Meeting of the IWGFR

  4. Working Group on Ionising Radiations. Report 1987-88

    International Nuclear Information System (INIS)

    1989-01-01

    The programme of work for 1987/88 by the Working Group on Ionising Radiation, Health and Safety Commision in February 1988, included the main topics of continuing interest and concern in relation to ionising radiations in general and the Ionising Radiations Regulations 1985 (IRR 85) (Ref 1) in particular. These were: emergency dose limitation, occupational dose limitation, practical experience of the principle of keeping doses as low as reasonably practicable, experience of the regulatory requirements in respect of internal dosimetry and the need for a standing advisory committee on ionising radiations. Calibration of radiotherapy equipment was also considered as a matter of principle following a specific incident involving cancer patients. This report of progress during the first year summarises the Group's opinions on each topic and gives recommendations. (author)

  5. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  6. Water Science and Technology Board annual report 1987

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    In 1982, the National Research Council chose to recognize the importance of water resource issues by establishing the Water Science and Technology Board (WSTB). During the five years since its first meeting in November 1982, the WSTB has grown and matured. The WSTB has met 14 times to provide guidance and plan activities. Under the WSTB's direction, committees of experts have conducted approximately 30 studies on a broad array of topics, from dam safety to irrigation-induced water quality problems to ground water protection strategies. Studies have ranged in scope from the oversight of specific agency projects and programs to broader scientific reviews, such as a disciplinary assessment of the hydrologic sciences initiated in 1987. In all cases, studies have the general theme of ultimately improving the scientific and technological bases of programs of water management and environmental quality. This fifth annual report of the WSTB summarizes the Board's accomplishments during 1987, its current activities, and its plans for the future. The report also includes information on Board and committee memberships, program organizations, and the reports produced. The report should provide the reader with a basic understanding of the WSTB's interests, achievements, and capabilities. The WSTB welcomes inquiries and suggestions concerning its activities and will provide more detailed information on any aspects of its work to those interested.

  7. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1986-1987 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McCabe, Jr., George T. (National Marine Fisheries Service, Environmental and Technical Services Division, Portland, OR); Beckman, Lance G. (US Fish and Wildlife Service, Portland, OR); Kreitman, Gayle (Washington Department of Fisheries, Olympia, WA)

    1987-06-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts.

  8. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  9. The German insurance industry. 1988 yearbook of the Gesamtverband der Deutschen Versicherungswirtschaft e.V

    International Nuclear Information System (INIS)

    1988-01-01

    The annual report presents among other things the figures of the nuclear insurance line. The Association of Nuclear Insurers in the F.R.G., the DKVG, counts 105 member companies in the year 1988, who offer reinsurance protection for West German nuclear power stations up to DM 1.5 billions in the property insurance sector, and up to DM 200 millions in the nuclear liability sector. The inland portfolio of the DKVG' covers 22 nuclear power stations. The expenses to satisfy claims in 1987 amounted to DM 6.5 millions. (DG) [de

  10. Status and Monitoring of Natural and Supplemented Chinook Salmon in Johnson Creek, Idaho, 2006-2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rabe, Craig D.; Nelson, Douglas D. [Nez Perce Tribe

    2008-11-17

    were 120,415 HOR supplementation smolts released into Johnson Creek during the week of March 12, 2007. Life stage-specific juvenile survival from Johnson Creek to Lower Granite and McNary dams was calculated for brood year 2005 NOR and HOR supplementation juvenile Chinook salmon. Survival of NOR parr Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 16.2%. Survival of NOR presmolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 22.3%. Survival of NOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 44.7% and 32.9%. Survival of HOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 31.9% and 26.2%. Multi-year analysis on smolt to adult return rate's (SAR's) and progeny to parent ratio's (P:P's) were calculated for NOR and HOR supplementation Brood Year 2002 Chinook salmon. SAR's were calculated from Johnson Creek to Johnson Creek (JC to JC), Lower Granite Dam to Lower Granite (LGD to LGD), and Lower Granite Dam to Johnson Creek (LGD to JC); for NOR fish SAR's were 0.16%, 1.16% and 1.12%, while HOR supplementation SAR's from JC to JC, LGD to LGD and LGD to JC were 0.04%, 0.19% and 0.13%. P:P's for all returning NOR and HOR supplemented adults were under replacement levels at 0.13 and 0.65, respectively. Recruit per spawner estimates (R/S) for Brood Year 2005 adult Chinook salmon were also calculated for NOR and HOR supplemented Chinook salmon at JC and LGD. R/S estimates for NOR and HOR supplemented fish at JC were 231 and 1,745, while R/S estimates at LGD were 67 and 557. Management recommendations address (1) effectiveness of data collection methods, (2) sufficiency of data quality (statistical power) to enable management recommendations, (3) removal of uncertainty and subsequent cessation of M&E activities, and (4) sufficiency of findings for program modifications prior to

  11. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  12. Recovery of the coral Montastrea annularis in the Florida Keys after the 1987 Caribbean ``bleaching event''

    Science.gov (United States)

    Fitt, William K.; Spero, Howard J.; Halas, John; White, Michael W.; Porter, James W.

    1993-07-01

    Many reef-building corals and other cnidarians lost photosynthetic pigments and symbiotic algae (zooxanthellae) during the coral bleaching event in the Caribbean in 1987. The Florida Reef Tract included some of the first documented cases, with widespread bleaching of the massive coral Montastrea annularis beginning in late August. Phototransects at Carysfort Reef showed discoloration of >90% of colonies of this species in March 1988 compared to 0% in July 1986; however no mortality was observed between 1986 and 1988. Samples of corals collected in February and June 1988 had zooxanthellae densities ranging from 0.1 in the most lightly colored corals, to 1.6x106 cells/cm2 in the darker corals. Minimum densities increased to 0.5x106 cells/cm2 by August 1989. Chlorophyll- a content of zooxanthellae and zooxanthellar mitotic indices were significantly higher in corals with lower densities of zooxanthellae, suggesting that zooxanthellar at low densities may be more nutrientsufficient than those in unbleached corals. Ash-free dry weight of coral tissue was positively correlated with zooxanthellae density at all sample times and was significantly lower in June 1988 compared to August 1989. Proteins and lipids per cm2 were significantly higher in August 1989 than in February or June, 1988. Although recovery of zooxanthellae density and coral pigmentation to normal levels may occur in less than one year, regrowth of tissue biomass and energy stores lost during the period of low symbiont densities may take significantly longer.

  13. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  14. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  15. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  16. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  17. AECB staff review of Bruce NGS 'A' operation for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    AECB project staff believes that overall performance of the station in 1988 was generally satisfactory and better than in 1987. However, this assessment is not supported by some of the key performance indicators, although the indicators in areas where AECB staff had specific concerns do support it. For example, the percentage of reported significant events attributable to human error, the number of operating memos beyond the review date, scheduled emergency drills completed, the number of completed reactor trips all show a significant improvement over the 1987 value. In addition, AECB staff has been encouraged by the licensee's implementation of effective review processes for operator and maintenance call-ups, routines and deficiencies, and the establishment of supervisor inspection tours and operator rounds programs. Nevertheless, it is the opinion of AECB staff that to achieve standards of operation which would be considered fully satisfactory, the backlog of maintenance work must be reduced, the quality of work performed in the plant improved, and assurance provided that the required quality standards are being consistently achieved and maintained

  18. Quantifying evaporation on the surface of slimes dams in the southeastern part of the North West Province

    OpenAIRE

    2014-01-01

    M.A. (Geography and Environmental Management) Water can be regarded as a scarce commodity in South Africa and one cannot rely solely on the discovery of new water resources to meet the ever increasing demands. Water is arguably the most precious resource in South Africa and its proper management in all spheres of activity is imperative ( Middleton and Stern,1987 ). This is no different in the mining industry where a primary consumptive use of water is in the tailings dams and associated re...

  19. Quantification of Libby Reservoir Water Levels Needed to Maintain or Enhance Reservoir Fisheries, 1988-1996 Methods and Data Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Dalbey, Steven Ray

    1998-03-01

    The Libby Reservoir study is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. This report summarizes the data collected from Libby Reservoir during 1988 through 1996.

  20. 1988 coal price negotiation

    Energy Technology Data Exchange (ETDEWEB)

    Senmura, Akira

    1988-12-01

    In the negotiation on raw coal price for 1988, which began at the end of 1987, Australia requested price rise of 4 - 5 dollars for the reason of rise of Australian dollars, conditions of mines, price drop in the past five years, and world supply/demand of coal. Japan insisted to maintain the price of preceding year. The talk ended in a dead lock which could last a long time. Negotiation on the Canadian coal price also encountered difficulties but an agreement was obtained in March as Japan accepted the increased price. After which, Japan and Australia agreed to raise the price by 2.90 dollars and an increase over last year. Producing countries also requested a wide price rise as 7.50 dollars for general coal, making in this area very difficult to progress. Finally, they agreed to raise the price by 6.30 dollars and the electric power utility in Japan responded by importing of U.S. coal, which has a lower heat output but is also cheaper. It depends on Australia for 70% of coal supply but started to diversify the source. 3 tabs.

  1. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  2. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XIII; Appraisal of System-Wide Survival Estimation of Snake River Yearling Chinook Salmon Released in 1997 and 1988, Using PIT-Tags Recovered from Caspian Tern and Double-Crested Cormorant Breeding Colonies on Rice Island, 1997-1998 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Perez-Comas, Jose A. (University of Washington, School of Fisheries, Seattle, WA)

    2000-05-01

    PIT-tags recovered from tern and cormorant breeding colonies at Rice Island and observations from the interrogation systems at John Day and Bonneville Dams were incorporated into survival analyses. Whether the estimates for the upper reaches of the system, between Lower Granite and McNary Dams were as expected (with weighted averages S{sub LGR-LGS} = 0.996, S{sub LGS-LMN} = 0.837, and S{sub LMN-McN} = 0.941), those for the lower reaches, between John Day and Bonneville Dams, appeared positively biased with survival estimates typically greater than 1. Their weighted averages were S{sub McN-JDA} = 0.707 and S{sub JDA-BON} = 1.792 for 1997 releases. For the 1998 releases, they were S{sub McN-JDA} = 0.795 and S{sub JDA-BON} = 1.312. If the estimates for the lower reaches were biased, the estimates for the whole project would also be biased (S{sub LGR-BON} = 0.819). We determined that bias could have arisen if the terns and cormorants of Rice Island fished for salmon yearlings in waters of the BON-Rice reach at low rates (M{sub BON-Rice} {le} 0.2), and the rates of tag-deposition and tag-detection were low (R{sub D} x R{sub R} {le} 0.4). Moreover, unknown levels of uncensored post-detection mortality and scavenging of previously dead salmon yearlings may have also added to the bias.

  3. The Nirex safety assessment research programme for 1987/88

    International Nuclear Information System (INIS)

    Cooper, M.J.; Tasker, P.W.

    1987-10-01

    This report outlines the work of the Nirex Safety Assessment Research Programme during the period 1st April 1987 to 31st March 1988. The research programme has the specific objective of providing the information requirements of the post-emplacement radiological safety case for the disposal of low-level and intermediate-level radioactive waste in underground repositories. For convenience the programme has been divided into seven areas: physical containment, near-field radionuclide chemistry, evolution of the near-field aqueous environment, mass transfer in the geosphere, the biosphere, gas evolution and migration, and integrated studies. The near-field includes the waste, its immobilising medium, its container, the engineered structure in which the container is emplaced and the immediately adjacent geological formation disturbed by the construction of the repository. (author)

  4. Proceedings of the International Conference on Lasers 󈨜 Held in Lake Tahoe, Nevada on 4-9 December 1988.

    Science.gov (United States)

    1989-01-01

    Multiphoton Double Ionization of Ba T. F. Gallagher, R. R. Jones, Y. Ziiu, U. Eichmann +, and W. Sandner + Department of Physics University of Virginia... Eichmann , Y. Zhu and T. F. Gallagher J. Phys. B 20 4461 tions, not necessarily at the shortest wavelengths. This is contrary (1987). to much of our...and J. M. Watson; Abstract 13.18, 10th International Free-Electron Laser Conference, Jerusalem , Israel, August 29-September 2, 1988. 2. "High-Extraction

  5. Quarterly report on program cost and schedule: Third quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes performance data through June 1988. In December 1987, Congress passed the Nuclear Waste Policy Amendments Act of 1987 which changed the near-term activities of the program. Specifically, this Act required that the tuff site in Nevada be characterized for the first repository and that site-specific activities at the other two first repository sites (the salt site in Texas and the basalt site in Washington) be terminated within 90 days of enactment. The Act requires the phase-out of all second repository activities designed to evaluate the suitability of crystalline rock as a potential hoist rock for a repository. The new legislation impacts the contents of this report by focusing the first repository program on the activities of the tuff project and phasing-out the activities for the salt, basalt and second repository projects

  6. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  7. The Agency's Technical Co-operation activities in 1987. Report by the Director General

    International Nuclear Information System (INIS)

    1988-08-01

    resources and 7.4% from In kind contributions. UNDP provided 6.2% of the total resources. Total new resources grew by 5.5% over the previous year, the total adjusted programme by 7.1%. Of this total adjusted programme, 61.3% was implement. The 67% implementation rate achieved in the TACF is higher than in any year prior to 1986. TACF pledges and miscellaneous income, reduced by losses on exchange, covered 88.6% of the target. The decline in percentage attainment of the target which began in 1983 continued unabated. The rate of annual increase in TACF resources declined further to 8.2%. The level of resources in 1987 was well below that assumed when the 1987 programme was designed. This shortfall in resources, combined with factors which favored project budget overruns, led to a level of over programming by year-end which was considerably above the acceptable limit. Measures taken in introducing the 1988 programme have in the meantime reduced this programme deficit to $5 million. Stringent control and conservative resource planning for the 1989-90 biennial programme will aim at ensuring that the approved programme will be contained within available resources. All future reports on technical co-operation activities covering the period starting from 1 January 1988 will present information concerning fields of activity in accordance with the Agency's Area of Activity/Project Codes (AAPC)

  8. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  9. Annual report of the Osaka Laboratory for Radiation Chemistry Japan Atomic Energy Research Institute, 22. April 1, 1988 - March 31, 1989

    International Nuclear Information System (INIS)

    1991-03-01

    This report describes research activities of Osaka Laboratory for Radiation Chemistry, JAERI during one year period from April 1, 1988 through March 31, 1989. The latest report, for 1987, is JAERI-M 90-054. Detailed descriptions of the activities are presented in the following subjects : (i) studies on laser-induced organic chemical reactions and (ii) studies on radiation chemistry of high polymers and radiation dosimetry. (J.P.N.)

  10. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  11. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  12. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  13. Brazil's Balbina Dam: Environment versus the legacy of the Pharaohs in Amazonia

    Science.gov (United States)

    Fearnside, Philip M.

    1989-07-01

    The Balbina Dam in Brazil's state of Amazonas floods 2360 km2 of tropical forest to generate an average of only 112.2 MW of electricity. The flat topography and small size of the drainage basin make output small. Vegetation has been left to decompose in the reservoir, resulting in acidic, anoxic water that will corrode the turbines. The shallow reservoir contains 1500 islands and innumerable stagnant bays where the water's residence time will be even longer than the average time of over one year. Balbina was built to supply electricity to Manaus, a city that has grown so much while the dam was under construction that other alternatives are already needed. Government subsidies explain the explosive growth, including Brazil's unified tariff for electricity. Alternative power sources for Manaus include transmission from more distant dams or from recently discovered oil and natural gas deposits. Among Balbina's impacts are loss of potential use of the forest and displacement of about one third of the surviving members of a much-persecuted Amerindian tribe: the Waimiri-Atroari. The dam was closed on 1 October 1987 and the first of five generators began operation in February 1989. The example of Balbina points to important ways that the decision-making process could be improved in Brazil and in the international funding agencies that have directly and indirectly contributed to the project. Environmental impact analyses must be completed prior to decisions on overall project implementation and must be free of influence from project proponents. The current environmental impact assessment system in Brazil, as in many other countries, has an undesirable influence on science policy, in addition to failing to address the underlying causes of environmentally destructive development processes and inability to halt “irreversible” projects like Balbina.

  14. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  15. AECB staff review of Bruce NGS'A' operation for the year 1987

    International Nuclear Information System (INIS)

    1988-06-01

    This report presents AECB project staff's review of major licensing issues and of the operational performance of the station during 1987. Ontario Hydro reports and official correspondence and observations on AECB staff at site have been taken into consideration. The report is limited to aspects of the station performance that AECB staff considers to have a safety significance. Where significant developments associated with issues addressed in the report occurred in the early part of 1988 (up to the time of writing), these are mentioned where appropriate. Ontario Hydro's Quarterly Reports for 1987 contain detailed technical information on the performance of the station, individual units and unit systems. It is the opinion of AECB project staff that despite a number of commendable actions and achievements which are identified in this report, the performance of the station in 1987 was only marginally satisfactory and less satisfactory than in 1986. This assessment is supported by key performance indicators such as the number of reportable significant events, the number of events caused by or influenced by human error and the reactor trip frequency, all of which exceeded 1986 levels, and also by the lack of satisfactory progress made during the year on actions to address the findings of the Fall '86 AECB Assessment of Operating Practices. AECB staff considers that the outstanding operations and maintenance problems that were identified in the 1986 Assessment are due, in part, to an ineffective quality assurance program, and in part to a shortage of resources

  16. SMM/HXRBS observations of Cygnus X-1 from 1986 December to 1988 April

    Science.gov (United States)

    Schwartz, R. A.; Orwig, L. E.; Dennis, B. R.; Ling, J. C.; Wheaton, W. A.

    1991-01-01

    The Solar Maximum Mission's Hard X-ray Burst Spectrometer made 30 measurements of Cygnus X-1 from December, 1986 to April, 1988, yielding a data set of broad synoptic coverage but limited duration for each data point. The hard X-ray intensity was found to be between the gamma(2) and gamma(3) levels, with a range of fluctuations about the average intensity level. The shape of the photon spectrum was found to be closest to that reported by Ling et al. (1983, 1987) during the time of the gamma(3) level emission, although the spectral shapes reported for the gamma(2) and gamma(1) levels were not precluded.

  17. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  18. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  19. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  20. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  1. De verkeersonveiligheid in 1987 : een kwantitatieve beschrijving van de verkeersonveiligheid in 1987.

    NARCIS (Netherlands)

    Blokpoel, A.

    1989-01-01

    Traffic safety in 1987 is described and quantitative description and analysis are given. 1987 is compared to the period 1982- 1986. In 1987 42.655 accidents with injuries were registered, out of which 1485 fatalities, and 35, 230 hospitalizations resulted. This is a slight decrease compared to 1986.

  2. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  3. Report on 1988 research result on the R and D of observation system for probing resources. 3/3; 1988 nendo shigen tansayo kansoku system no kenkyu kaihatsu. 3/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This paper explains the 1988 results of the specialized study in the R and D of the observation system for probing resources. In the system development of the synthetic-aperture radar (SAR) to be loaded on the earth resources satellite ERS-1, the basic design was reexamined, with an SAR system test carried out. A combination test was performed for SAR and the mission transmitter. The testing device was also improved and manufactured. The optical sensor needs to be a system that uses a wide wavelength area and that is capable of receiving a image data of a high surface resolution; accordingly, on the basis of 1988 results, it was tested by preparing an engineering model (EM). The mission recording device records the observation data of SAR and the optical sensor in an invisible area, reproduces it in a visible area in the ground station, and obtains data. The EM development test implemented in fiscal 1987 was continued for the electronics part and the transport part, with the specifications and interface control documents established simultaneously. Combination tests with the mission transmitter were carried out. Studies were also stated on the antenna part/transmitter part of the mission transmitter. (NEDO)

  4. Second meeting of the International Working Group on Advanced Technologies for Water Cooled Reactors, Helsinki, 6-9 June 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The Second Meeting of the IAEA International Working Group on Advanced Technologies for Water Cooled Reactors (IWGATWR) was held in Helsinki, Finland, from 6-9 June 1988. The Summary Report (Part II) contains the papers which review the national programmes since the first meeting of IWGATWR in May 1987 in the field of Advanced Technologies for Water Cooled Reactors and other presentations at the Meeting. A separate abstract was prepared for each of these 12 papers presented at the meeting. Figs and tabs

  5. Lessons from the autumn 2014 flash floods in the city of Nîmes and its neighborhood (France: behavior of several mitigation dams and hydrological analysis

    Directory of Open Access Journals (Sweden)

    Fouchier Catherine

    2016-01-01

    Full Text Available The Languedoc area, in Southern France, is prone to autumnal flash floods which are characteristic of the Mediterranean climate. To cope with this threat, the local authorities have chosen to build several dams on the main dangerous rivers of the area. We have focused on the flood mitigation facilities of two operators: the City of Nîmes and the Gardons Rivers Managing authority. After the catastrophic flash flood of October 1988, the city of Nîmes built flood mitigation dams on many of its high-risk streams. These flood barriers worked several times during the intense rainfalls of autumn 2014. The on-site conclusions drawn from these floods and the computation carried out with hydrological models confirmed how well the dams functioned. In 2010, the Gardons Rivers Managing authority built a flood mitigation dam on the Esquielle River to protect the village of Saint-Geniès-de-Malgoirès. The spillway of this dam worked for the first time in the autumn of 2014. We analyzed one of the major floods monitored on that occasion at its outlet. The goals of this study are: (i to evaluate dams efficiency and (ii to test, on a catchment which was not used for its calibration, the AIGA flash flood warning method, which was developed by IRSTEA.

  6. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  7. Annual report 1986-1987

    International Nuclear Information System (INIS)

    1988-01-01

    The Australian Nuclear Science and Technology Organisation (ANSTO) is a statutory body constituted by the ANSTO Act, 1987. The Act, which came into force on Monday, 27 April 1987, established ANSTO as the successor organisation to the Australian Atomic Energy Commission (AAEC) originally established under the Atomic Energy Act, 1953. The AAEC was abolished under the provisions of the Atomic Energy Amendment Act, 1987. This report covers the operations of the two statutory bodies for the financial year ended 30 June 1987

  8. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  9. A compilation of reports of the Advisory Committee on Reactor Safeguards: 1987 annual

    International Nuclear Information System (INIS)

    1988-04-01

    This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1987. It also includes a report to the Congress on the NRC Safety Research Program for FY 1988. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order

  10. Semi-quantitive microplankton analysis (Sylt Roads Time Series) in the Wadden Sea off List, Sylt, North Sea in 1987-2001

    OpenAIRE

    Rick, Johannes

    2016-01-01

    See data in other version: 1987 - https://doi.pangaea.de/10.1594/PANGAEA.861296 / 1988 - https://doi.pangaea.de/10.1594/PANGAEA.861297 / 1989 - https://doi.pangaea.de/10.1594/PANGAEA.861298 / 1990 - https://doi.pangaea.de/10.1594/PANGAEA.861299 / 1991 - https://doi.pangaea.de/10.1594/PANGAEA.861300 / 1992 - https://doi.pangaea.de/10.1594/PANGAEA.861301 / 1993 - https://doi.pangaea.de/10.1594/PANGAEA.861302 / 1994 - https://doi.pangaea.de/10.1594/PANGAEA.861303 / 1995 - https://doi.pangaea.de/...

  11. Non-LTE model calculations for SN 1987A and the extragalactic distance scale

    Science.gov (United States)

    Schmutz, W.; Abbott, D. C.; Russell, R. S.; Hamann, W.-R.; Wessolowski, U.

    1990-01-01

    This paper presents model atmospheres for the first week of SN 1987A, based on the luminosity and density/velocity structure from hydrodynamic models of Woosley (1988). The models account for line blanketing, expansion, sphericity, and departures from LTE in hydrogen and helium and differ from previously published efforts because they represent ab initio calculations, i.e., they contain essentially no free parameters. The formation of the UV spectrum is dominated by the effects of line blanketing. In the absorption troughs, the Balmer line profiles were fit well by these models, but the observed emissions are significantly stronger than predicted, perhaps due to clumping. The generally good agreement between the present synthetic spectra and observations provides independent support for the overall accuracy of the hydrodynamic models of Woosley. The question of the accuracy of the Baade-Wesselink method is addressed in a detailed discussion of its approximations. While the application of the standard method produces a distance within an uncertainty of 20 percent in the case of SN 1987A, systematic errors up to a factor of 2 are possible, particularly if the precursor was a red supergiant.

  12. Medical follow up of ten patients victims of the radiological accident occurred in Goiania, Goias State, Brazil 1988/1992

    International Nuclear Information System (INIS)

    Curado, M.P.; Morais, M.S.A.; Silva, J.F.; Assis, P.R.; Oliveira, A.R.; Santos, E.A.

    1992-01-01

    The author makes an update of the medical aspects of ten victims of the radiological accident occurred in Goiania in September 1987. These patients received specialized treatment during the critical phase at Marcilio Dias Naval Hospital in Rio de Janeiro. Actually these patients are under medical follow-up at Leide das Neves Ferreira Foundation since march 1988. The clinical, haematological and laboratorial results are presented and discussed. The importance of a close medical follow-up direct victims of a radiological accident is stressed. (author)

  13. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  14. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  15. Licensee contractor and vendor inspection status report: Quarterly report, October 1987-December 1987

    International Nuclear Information System (INIS)

    1988-02-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1987 thru December 1987. Also, included in this issue are the results of certain inspections performed prior to October 1987 that were not included in previous issues of NUREG-0040

  16. Licensee contractor and vendor inspection status report: Quarterly report, July 1987-September 1987

    International Nuclear Information System (INIS)

    1987-10-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from July 1987 through September 1987. Also included in this issue are the results of certain inspections performed prior to July 1987 that were not included in previous issues of NUREG-0040

  17. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  18. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  19. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  20. Report on 1988 research result on the R and D of observation system for probing resources. 1/3; 1988 nendo shigen tansayo kansoku system no kenkyu kaihatsu. 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This paper explains the 1988 results of the R and D of the observation system for probing resources. The system is scheduled to be loaded on earth resources satellite ERS-1 for which launching in 1991 has been set. On the basis of the results until fiscal 1987, 1988, technical examination was made continuously. As to the interface with the satellite body, the specifications were revised by making adjustment in technical items with the satellite body concerning electrical, mechanical, thermal and environmental interfaces, for example. In the sensor system, the technical specifications until now was reexamined and revised. In addition, an EM (engineering model) which was manufactured based on the basic design, was developed, tested and delivered to the satellite body side. In other words, in the studies of the on-satellite synthetic-aperture radar (SAR), the test device was improved and manufactured, with the EM and SAR system developed and tested. In the optical sensor, the test device was also prepared, with the EM manufactured, developed and tested. In the data transmission system, the specifications were revised by developing and testing an EM for the mission recording device. The mission transmitter was tested with EM and also in combination with other mission equipment. (NEDO)

  1. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  2. Annual report 1987 - 1988

    International Nuclear Information System (INIS)

    Whitley, J.E.

    1990-01-01

    The Scottish Universities Research and Reactor Centre (SURRC) is an inter-University research centre which seeks to provide, in its own right, a Scottish centre of excellence in key areas of the isotopic, nuclear and earth sciences and, as a shared equipment and resource centre, to offer collaborative research facilities and expertise for the benefit of the staff and students of a Consortium of Scottish Universities. In terms of its research interests, the Centre currently offers a wide range of facilities and expertise in subject areas including geology, medicine, biology, engineering, archaeology, environmental science, chemistry and physics. Foremost of the Centre's activities is the work of the Isotope Geology Unit (IGU). Particular in-house interests relate to the development and application of new techniques of measuring radiogenic and stable isotopes in the geological and geochemical contexts. Joint work of the Isotope Geology Unit and the Nuclear Medicine group has resulted in a growing interest and capability in the application of enriched stable isotope tracers in the biological and clinical sciences. The SURRC also has a range of facilities and expertise in areas involving measurements of radioactive, rather than stable, isotopes. The applications cross many subject boundaries, including Quaternary geology, archaeology, nuclear medicine, health physics, oceanography, atmospheric sciences, environmental chemistry/radioactivity, nuclear waste disposal and mathematical modelling of the environment. (author)

  3. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  4. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  5. Licensee contractor and vendor inspeecxtion status report: Quarterly report, January 1988-March 1988

    International Nuclear Information System (INIS)

    1988-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January 1988 through March 1988. Also included in this issue are the results of certain inspections performed prior to January 1988 that were not included in previous issues of NUREG-0040

  6. Licensee contractor and vendor inspection status report: Quarterly report April 1988--June 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from April 1988 through June 1988. Also included in this issue are the results of certain inspections performed prior to April 1988 that were not included in previous issues of NUREG-0040

  7. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  8. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  9. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  10. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  11. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  12. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  13. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  14. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  15. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  16. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  17. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  18. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  19. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to

  20. Evolution of the sensor fish device for measuring physical conditions in sever hydraulic environments

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Duncan, J. P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2003-03-01

    To assist in deriving biological specifications for design of turbine rehabilitation measures, new “fish-friendly” turbines, and spillway designs and operations, Pacific Northwest National Laboratory (PNNL) scientists have developed and tested an autonomous multi-sensor device called a Sensor Fish that can acquire pressure and tri-axial linear acceleration data during passage through severe hydraulic conditions. The purpose of the Sensor Fish is to characterize physical conditions fish experience during passage through hydro turbines, spill stilling basins, high-discharge outfalls, and other dam passage routes. This report discusses the development and field tests of the Sensor Fish at Rock Island, McNary, The Dalles, Bonneville, and Wanapum dams on the Columbia River and the Prosser Irrigation District on the Yakima River, which have shown that the device can withstand the severe environments of turbine, spill, and fish bypass passage and provide useful environmental data that can ultimately aid in the design and operation of new and existing turbines, spill, and dam fish bypass facilities.

  1. ITER Council proceedings: April 1988 - August 1989

    International Nuclear Information System (INIS)

    1990-01-01

    The ITER documentation series, of which this is the sixth report, began with a concise record of the decisions and actions taken in establishing ITER. The contents of that first report include the Terms of Reference Concerning Conceptual Design Activities for an International Thermonuclear Experimental Reactor. The Terms of Reference, which were part of the IAEA's invitation to the prospective parties, formally describe how the co-operative work of the four Parties in the specified activities is directed and managed. The first report in the series also covered activities from the initial meeting of the ITER Quadripartite Initiative Committee in March 1987 through March 1988. The present report is intended to make available in convenient form the essential information on ''landmark'' events in the direction of the ITER activities from the first meeting of the ITER Council (IC), in April 1988, through the letter report by the Council following their fourth meeting in July 1989. This report therefore covers approximately the first half of the Conceptual Design Activities, which are to be concluded in December 1990. THe next section of this report provides, for convenient reference, an overview of the organization and schedule that were adopted for the ITER activities through 1990. The sections that follow contain, for each of the four IC meetings during the period covered by this report, a copy of the official record of the transactions. The written reports of the ITER Management Committee (IMC) and the ITER Scientific and Technical Advisory Committee (ISTAC) to the IC in connection with the meetings are represented by summaries, prepared by the ITER Secretariat. These summaries include direct quotations of especially significant statements in the reports. In general, other supporting material is included only if it is of more than transitory significance. 1 fig and tabs

  2. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  3. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  4. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  5. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  6. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  7. TOVS data analysis during the catastrophic floods of Bangladesh of 1987 and 1988 and Cyclone of 1985

    International Nuclear Information System (INIS)

    Choudhury, A.M.

    1990-08-01

    Bangladesh has witnessed catastrophic floods in recent years so much so that in 1988 two-thirds of the country was flooded. This had created a world-wide attention. NOAA AVHRR and LANDSAT TM data have been analyzed to monitor floods. TOVS data prior to flooding, have also been analyzed to find out the causes of abnormal rainfall in the catchment area, responsible for flooding. TOVS data of the cyclone of 25 May 1985 which hit Bangladesh have also been analyzed. Satellite imagery can be very effectively used in the early warning of floods and cyclones. (author). 4 refs

  8. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  9. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  10. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  11. SKB annual report 1988

    International Nuclear Information System (INIS)

    1989-12-01

    This is the annual report on the activities of the Swedish Nuclear Fuel and Waste Management Co, SKB. It contains in part 1 an overview of SKB activities in different fields. Part 2 gives a description of the research and development work on nuclear waste disposal performed during 1988. Lectures and publications during 1988 as well as reports issued in the SKB technical report series are listed in part 3. Part 4 contains the summaries of all technical reports issued during 1988. SKB is in charge of a comprehensive research and development program on geological disposal of nuclear waste. The total cost for R and D during 1988 was 123.4 MSEK of which 19.3 MSEK came from participants outside Sweden

  12. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  13. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  14. Hydrodynamic Simulation of the Columbia River, Hanford Reach, 1940--2004

    Energy Technology Data Exchange (ETDEWEB)

    Waichler, Scott R.; Perkins, William A.; Richmond, Marshall C.

    2005-06-15

    Many hydrological and biological problems in the Columbia River corridor through the Hanford Site require estimates of river stage (water surface elevation) or river flow and velocity. Systematic collection of river stage data at locations in the Hanford Reach began in 1991, but many environmental projects need river stage information at unmeasured locations or over longer time periods. The Modular Aquatic Simulation System 1D (MASS1), a one-dimensional, unsteady hydrodynamic and water quality model, was used to simulate the Columbia River from Priest Rapids Dam to McNary Dam from 1940 to 2004, providing estimates of water surface elevation, volumetric flow rate, and flow velocity at 161 locations on the Hanford Reach. The primary input data were bathymetric/topographic cross sections of the Columbia River channel, flow rates at Priest Rapids Dam, and stage at McNary Dam. Other inputs included Yakima River and Snake River inflows. Available flow data at a gaging station just below Priest Rapids Dam was mean daily flow from 1940 to 1986 and hourly thereafter. McNary dam was completed in 1957, and hourly stage data are available beginning in 1975. MASS1 was run at an hourly timestep and calibrated and tested using 1991--2004 river stage data from six Hanford Reach locations (areas 100B, 100N, 100D, 100H, 100F, and 300). Manning's roughness coefficient in the Reach above each river recorder location was adjusted using an automated genetic algorithm and gradient search technique in three separate calibrations, corresponding to different data subsets, with minimization of mean absolute error as the objective. The primary calibration was based on 1999, a representative year, and included all locations. The first alternative calibration also used all locations but was limited in time to a high-flow period during spring and early summer of 1997. The second alternative calibration was based on 1999 and included only 300 Area stage data. Model goodness-of-fit for all

  15. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  16. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  17. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  18. Appalachian States Compact Low-Level Radioactive Waste management survey, 1987

    International Nuclear Information System (INIS)

    Singh, K.N.

    1989-03-01

    Since the enactment of the Low-Level Radioactive Waste Disposal Act in February 1988, the Commonwealth of Pennsylvania has undertaken major steps to develop a Low-Level Radioactive Waste (LLRW) Disposal Facility within its borders for the exclusive use of radioactive material licensees in the Appalachian States Compact. In order to adequately plan for the design and development of that facility, it is essential to obtain accurate data on LLRW being generated in the Compact. To that end, the Division of Nuclear Safety of the Pennsylvania Bureau of Radiation Protection (BRP) conducted a survey to determine volume and activity of LLRW shipped and stored in 1987 by the licensees in the Appalachian States Compact. The 1986 LLRW survey included licensees in Pennsylvania and Maryland, while surveys conducted prior to 1986 involved only Pennsylvania licensees. So this is the first survey conducted by BRP that has included all four states of the Compact

  19. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  20. Licensee contractor and vendor inspection status report: Quarterly report, October 1988--December 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from October 1988 through December 1988

  1. Tabulation of comet observations.

    Science.gov (United States)

    1991-07-01

    Concerning comets: 1957 III Arend-Roland, 1957 V Mrkos, 1958 III Burnham, 1959 III Bester-Hoffmeister, 1959 VI Alcock, 1959 VIII P/Giacobini-Zinner, 1960 I P/Wild 1, 1960 II Burnham, 1960 III P/Schaumasse, 1960 VIII P/Finlay, 1961 V Wilson-Hubbard, 1961 VIII Seki, 1962 III Seki-Lines, 1962 VIII Humason, 1963 I Ikeya, 1963 III Alcock, 1963 V Pereyra, 1964 VI Tomita-Gerber-Honda, 1964 VIII Ikeya, 1964 IX Everhart, 1979 X Bradfield, 1980 X P/Stephan-Oterma, 1980 XII Meier, 1980 XIII P/Tuttle, 1981 II Panther, 1982 I Bowell, 1982 IV P/Grigg-Skjellerup, 1982 VII P/d'Arrest, 1986 III P/Halley, 1987 IV Shoemaker, 1987 XII P/Hartley 3, 1987 XIX P/Schwassmann-Wachmann 2, 1987 XXIX Bradfield, 1987 XXX Levy, 1987 XXXII McNaught, 1987 XXXIII P/Borrelly, 1987 XXXVI P/Parker-Hartley, 1987 XXXVII P/Helin- Roman-Alu 1, 1988 III Shoemaker-Holt, 1988 V Liller, 1988 VIII P/Ge-Wang, 1988 XI P/Shoemaker-Holt 2, 1988 XIV P/Tempel 2, 1988 XV Machholz, 1988 XX Yanaka, 1988 XXI Shoemaker, 1988 XXIV Yanaka, 1989 III Shoemaker, 1989 V Shoemaker-Holt-Rodriquez, 1989 VIII P/Pons-Winnecke, 1989 X P/Brorsen-Metcalf, 1989 XI P/Gunn, 1989 XIII P/Lovas 1, 1989 XVIII McKenzie-Russell, 1989 XIX Okazaki-Levy-Rudenko, 1989 XX P/Clark, 1989 XXI Helin-Ronan-Alu, 1989 XXII Aarseth-Brewington, 1989h P/Van Biesbroeck, 1989t P/Wild 2, 1989u P/Kearns-Kwee, 1989c1 Austin, 1989e1 Skorichenko-George, 1990a P/Wild 4, 1990b Černis-Kiuchi-Nakamura, 1990c Levy, 1990e P/Wolf-Harrington, 1990f P/Honda-Mrkos-Pajdušáková, 1990g McNaught-Hughes, 1990i Tsuchiya-Kiuchi, 1990n P/Taylor, 1990ο P/Shoemaker-Levy 1, 1991a P/Metcalf-Brewington, 1991b Arai, 1991c P/Swift-Gehrels, 1991d Shoemaker-Levy, 1991e P/Shoemaker-Levy 3, 1991h P/Takamizawa, 1991j P/Hartley 1, 1991k P/Mrkos, 1991l Helin-Lawrence, 1991n P/Faye, 1991q P/Levy, 1991t P/Hartley 2, P/Encke, P/Schwassmann-Wachmann 1.

  2. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  3. Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996

    International Nuclear Information System (INIS)

    None

    1997-01-01

    OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D and D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D and D activities beginning in 1997

  4. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  5. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  6. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  7. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  8. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  9. Impacts of Water Levels on Breeding Canada Geese and Methods for Mitigation and Management in the Southern Flathead Valley, Montana, 1983-1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mackey, Dennis L.; Gregory, Shari K.; Matthews, William C. Jr.; Claar, James J.; Ball, I. Joseph

    1987-11-01

    Kerr Hydroelectric Dam is located at the south end of Flathead Lake, controls water levels on the lake and the Flathead River below the dam, and is currently operated as a load control facility. Current operation of Kerr Dam creates the greatest yearly water level fluctuations on both the lake and river during the Canada goose (Branta canadensis moffitti) brood and nesting period. Data collected from 1980-1982 indicated that goose nest numbers on the river were lower than during the 1950's, and that brood habitat on the lake may be limiting the goose population there. Our study was conducted from 1983-1987 to determine the effects of Kerr Dam operation on Canada goose populations and habitat on the south half of Flathead Lake and the Flathead River, and to formulate management and mitigation recommendations. Nesting geese on the river appeared to be negatively affected by a lack of nest sites free from predators, and responded to available artificial nest structures with an increase in nest numbers and nesting success. Under current dam operation, river channel depths and widths do not discourage access to nesting islands by mammalian predators during some years and high predation on ground nests occurs. Intensively used brood areas on the lake and river were identified and described. Brood habitat on the lake was lower in quality and quantity than on the river due to dam operations. Gosling mortality on the lake was high, almost 2 times higher than on the river. Lake broods expended more energy obtaining food than river broods. Losses of brood habitat in the form of wet meadow marshes were documented and mitigation options developed. Management/mitigation alternatives and monitoring methods for nesting and brooding geese were identified.

  10. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  11. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  12. Supernova 1987A in the Large Magellanic Cloud

    Science.gov (United States)

    Kafatos, Minas; Michalitsianos, Andrew G.

    2006-11-01

    Foreword; Acknowledgements; Workshop participants; 1. Images and spectrograms of Sanduleak - 69º202, the SN 1987a progenitor N. R. Walborn; 2. The progenitor of SN 1987A G. Sonneborn; 3. Another supernova with a blue progenitor C. M. Gaskell and W. C. Keel; 4. Optical and infrared observations of SN 1987A from Cerro Tololo Inter-American Observatory M. M. Phillips; 5. SN 1987A: observational results obtained at ESO I. J. Danziger, P. Bouchet, R. A. E. Fosbury, C. Gouiffes, L. B. Lucy, A. F. M. Moorwood, E. Oliva and F. Rufener; 6. Observations of SN 1987A at the South African Astronomical Observatory (SAAO) M. W. Feast; 7. Observations of SN 1987A at the Anglo-Australian Telescope W. J. Couch; 8. Linear polarimetric study of SN 1987A A. Clocchiatti, M. Méndez, O. Benvenuto, C. Feinstein, H. Marraco, B. García and N. Morrell; 9. Infrared spectroscopy of SN 1987A from the NASA Kuiper Airborne Observatory H. P. Larson, S. Drapatz, M. J. Mumma and H. A. Weaver; 10. Radio observations of SN 1987A N. Bartel et al.; 11. Ultraviolet observations of SN 1987A: clues to mass loss R. P. Kirshner; 12. On the energetics of SN 1987A N. Panagia; 13. On the nature and apparent uniqueness of SN 1987A A. V. Filippenko; 14. A comparison of the SN 1987A light curve with other type II supernovae, and the detectability of similar supernovae M. F. Schmitz and C. M. Gaskell; 15. P-Cygni features and photospheric velocities L. Bildsten and J. C. L. Wang; 16. The Neutrino burst from SN 1987A detected in the Mont Blanc LSD experiment M. Aglietta et al.; 17. Toward observational neutrino astrophysics M. Koshiba; 18. The discovery of neutrinos from SN 1987A with the IMB detector J. Matthews; 19. Peering into the abyss: the neutrinos from SN 1987A A. Burrows; 20. Phenomenological analysis of neutrino emission from SN 1987A J. N. Bahcall, D. N. Spergel and W. H. Press; 21. Mass determination of neutrinos H. Y. Chiu; 22. Neutrino transport in a type II supernova D. C. Ellison, P. M. Giovanoni

  13. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  14. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  15. Total-ozone and nitrogen-dioxide measurements at the Molodezhnaya and Mirnyi Antarctic stations during spring 1987-autumn 1988

    Energy Technology Data Exchange (ETDEWEB)

    Elokhov, A.S.; Gruzdev, A.N. (AN SSSR, Institut Fiziki Atmosfery, Moscow, (USSR))

    1991-09-01

    Results of measurements of the total-ozone and NO2 content during November-December (Molodezhnaya) and February-April 1988 (Mirnyi) are reported. During the November-December period an irregular total ozone increase was observed, which characterized the filling up of the ozone hole. Stratospheric warming and the total NO2 increase occurred simultaneously. During the summer-autumn period the total NO2 content decreased gradually. The evening total NO2 content was systematically greater than the morning one, which reflects changes in the NO2 abundance from day to night. 12 refs.

  16. Elemental contents determination in two different zones of Mexico City on the 1987-88 and 1994-95 winters

    International Nuclear Information System (INIS)

    Diaz G, R.V.

    1996-01-01

    During the 1987-1988 and 1994-1995 winters, there were taken samples of aerosols in Mexico City, in two different places, using an integral type of sampler which determines the total amount of suspended particulates; these samples were analyzed by the multi-element analysis technique called PIXE (Proton Induced X-ray Emission). One of the sites corresponds to the Alvaro Obregon area and the other to the Azcapotzalco area (a place near to the18 de Marzo Refinery). There were determined 16 elements, heavy metals, whose concentrations show differences for both sites and periods, standing out for this study the behavior of S, V and Pb. (Author)

  17. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987; Istrazivacki nuklearni reaktor RA Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1987. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction. [Serbo-Croat] Reaktor RA nije radio usled zabrane Izvsnog veca Skupstine Srbije od 27. avgusta 1984. U cilju povecanja pouzdanosti rada reaktora a da bi se udovoljilo zakonskim propisima sto je uslov za dobijanje stalne dozvole za rad realizovana su tri velika zahvata na reaktoru RA. Ovi zahvati obuhvatili su izgradnju sistema za hladjenje jezgra reaktora u slucaju nuzde, rekonstukciju postojeceg sistema specijalne ventilacije i rekonstrukciju sistema napajanja elektricnom energijom neophodnih potrosaca reaktora RA. Zapoceti su radovi na modernizaciji intrumentacije reaktora RA, projekat je izradjen u sovjetskoj organizaciji Atomenergoeksport, a trebalo bi da se realizuje do kraja 1989. godine. U cilju povecanja prostora za skladistenje ozracenog nuklearnog goriva i njegovog efikasnijeg koriscenja, izradjen je su projekti za rekonstrukciju postojecih uredjaja za rukovanje gorivom, povecanje smestajnog kapaciteta i preciscavanje vode u bazenima za odlezavanje. Realizaija ovih

  18. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  19. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  20. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  1. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  2. 1988 sheep monitoring programme January - December 1988

    International Nuclear Information System (INIS)

    Colgan, P.A.; Scully, B.J.

    1989-06-01

    This report summarises the work undertaken by the Board during 1988 and includes the results of in vivo farm measurements, slaughterhouse monitoring and butcher's shops surveys relating to sheep and sheepmeat

  3. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  4. The level of cesium radioactivity after the Chernobyl accident on the tea plantation in Turkey

    International Nuclear Information System (INIS)

    Elinc, F.; Antep, S.; Tuekenmez, I.; Celenk, I.; Demirel, H.

    1996-01-01

    The Eastern Black Sea coastal region in Turkey was contaminated with radionuclides after the Chernobyl accident.The radioactive Cs contamination was serious in the tea crop. The objective of this study was to find out the level of Cs contamination in the leaf of tea crop and the soil in years following the accident. The study was conducted on the sixty-two representative sampling units where leaf and soil samples were taken in 1987,1988 and 1989. The results obtained showed that although the levels of Cs radioactivity in the leaf of tea crop and in the soil were relatively high in June 1987, the level tended to decrease in September 1987 and the decrease was abrupt in 1988 and 1989, such that 2%, 63% and 94% of the leaf samples contained less than 600 Bq/kg Cs radioactivity in June of 1987,1988 and 1989, respectively. Although all the soil samples had Cs radioactivity June and September 1987 and in June 1988, 32% and 26% of the soils had no Cs radioactivity in September 1988 and 1989. The results showed that the amount of Cs radioactivity in the soil had positive correlation with the soil organic matter (P<0.01) in 1987 and 1988 but the correlation was not significant in 1989. The amount of Cs activity in the leaf samples had positive correlation (P<0.01) with the level of Cs activity in soil in 1987, the level of Cs radioactivity in the leaf of tea crop had inverse correlation (P<-0.05) with the exchangeable magnesium and calcium contents in the soil in 1987

  5. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  6. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  7. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  8. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  9. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  10. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  11. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  12. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  13. Rates of consumption of juvenile salmonids and alternative prey fish by northern squawfish, walleyes, smallmouth bass, and channel catfish in John Day Reservoir, Columbia River

    International Nuclear Information System (INIS)

    Vigg, S.; Poe, T.P.; Prendergast, L.A.; Hansel, H.C.

    1991-01-01

    Adult northern squawfish Ptychocheilus oregonesis, walleyes Stizostedion vitreum, smallmouth bass Micropterus dolomieu, and channel catfish Ictalurus punctatus were sampled from four regions of John Day Reservoir from April to August 1983-1986 to quantify their consumption of 13 species of prey fish, particularly seaward-migrating juvenile Pacific salmon and steelhead (Oncorhynchus spp.). Consumption rates were estimated from field data on stomach contents and digestion rate relations determined in previous investigations. For each predator, consumption rates varied by reservoir area, month, time of day, and predator size or age. The greatest daily consumption of salmonids by northern squawfish and channel catfish occurred in the upper end of the reservoir below McNary Dam. Greatest daily predation by walleyes and smallmouth bass occurred in the middle and lower reservoir. Consumption rates of all predators were highest in July, concurrent with maximum temperature and abundance of juvenile salmonids. Feeding by the predators tended to peak after dawn and near midnight. Northern squawfish below McNary Dam exhibited this pattern, but fed mainly in the morning hours down-reservoir. The daily ration of total prey fish was highest for northern squawfish over 451 mm fork length, for walleyes 201-250 mm, for smallmouth bass 176-200 mm, and for channel catfish 401-450 mm. Averaged over all predator sizes and sampling months (April-August), the total daily ration (fish plus other prey) of smallmouth bass was about twice that of channel catfish, northern squawfish, and walleyes. However, northern squawfish was clearly the major predator on juvenile salmonids

  14. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  15. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  16. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  17. The Prescription Drug Marketing Act of 1987.

    Science.gov (United States)

    Greenberg, R B

    1988-10-01

    The Prescription Drug Marketing Act of 1987 is described, and its implications for hospitals and other health-care entities are discussed. The act, which became effective on July 21, 1988, is intended to reduce public health risks from adulterated, misbranded, and counterfeit drug products that enter the marketplace through drug diversion. The law provides that prescription drug products manufactured in the United States and exported can no longer be reimported, except by the product's manufacturer. It also establishes restrictions on sales of prescription drug products and samples. Samples of prescription drug products may be distributed only if a licensed prescriber requests them. Other distribution channels for samples specified in the law are permissible, provided records are maintained. Under the law, wholesale distributors must be licensed by the state and meet uniform standards. Penalties for violations of the law are also identified. According to FDA's advisory guidelines on the statute, the law will permit hospitals to return drug products, provided the return is made to the manufacturer or wholesaler and provided written notice is secured that the goods were received (for manufacturers) or the goods were destroyed or returned to the manufacturer (for wholesalers). The final chapter on drug diversion must await issuance of final FDA regulations.

  18. [Possible cause of the increased incidence of lung cancer in 1987 in the 10th District of Budapest (1975-1989)].

    Science.gov (United States)

    Abrahám, E; Karácsonyi, L; Dinya, E

    1990-12-30

    In 1975 in one of the major industrial districts of Budapest some longitudinal epidemiological examinations were carried out with the aim of, among others, determination of connection between environmental injuries and lung cancer incidence in connection with determination of lung cancer risk groups. Between 1975-1989 out of the environmental injuries the most important was the radioactive contamination observed due to the atomic power station catastrophe in Chernobil (1986). In 1987 the incidence of lung cancer increased. The increase was significant among the 50-69-year-old women, and expressly among the heavy smokers. In 1987, especially among women, but also in both sexes, the ratio among the major cell types of lung cancer shifted towards micro-cellular ones. In 1988 and 1989 lung cancer incidence has decreased. In view of the above a hypothesis was raised: patients who have previously suffered immunobiological hurt, could not prevent the increased radioactive burden and got ill with lung cancer earlier, than it should have been happened without this increased burden. For clarification this question further examinations are considered to be necessary.

  19. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  20. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  1. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1995. Annual report

    International Nuclear Information System (INIS)

    Achord, S.; Eppard, M.B.; Sandford, B.P.; Matthews, G.M.

    1996-09-01

    We PIT tagged wild spring/summer chinook-salmon parr in the Snake River Basin in 1994 and subsequently monitored these fish during their smolt migration through Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Darns during spring, summer, and fall 1995. This report details our findings. The goals of this study are to (1) characterize the migration timing of different wild stocks of Snake River spring/summer chinook salmon smolts at dams on the Snake and Columbia Rivers, (2) determine if consistent patterns are apparent, and (3) determine what environmental factors influence migration timing

  2. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  3. Comments of the PRA Senior Review Panel on the meeting held December 1--3, 1987

    International Nuclear Information System (INIS)

    Sharp, D.A.

    1988-01-01

    This memorandum records the minutes of the PRA Senior Review Panel meeting held at Savannah River Laboratory (SRL) on December 1--3, 1987, and the report on that meeting written subsequently by the panel members. The minutes are contained as Attachment 2 of this memorandum, and the report as Attachment 1. The Panel indicated two principal concerns in their report: (1) that insufficient emphasis is being placed on the reliability data development program, and (2) that excessive detail is being built into the fault trees. These concerns have been addressed in a subsequent meeting with the Panel, held March 2--4, 1988. In addition, the members have been provided with a program document (Reference 1) indicating the extent, the timing, and the limitations of the data analysis effort for the PRA

  4. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  5. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  6. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  7. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  8. Exports of petroleum products, 1987

    International Nuclear Information System (INIS)

    1988-04-01

    A summary is presented of exports of motor gasoline, middle distillate, aviation turbine fuel, heavy fuel oil, and partially processed oil from Canada for the 1987 calendar year. A discussion of petroleum product imports is included in order to put exports in the context of the overall trade. Exports of the above petroleum products averaged 22,200 m 3 /d in 1987, up 15% from 1986 levels. Exports of middle distillates and aviation fuel had the largest gains in 1987. Export prices for light petroleum products stayed relatively close to USA spot prices. The heavy fuel oil price was below the New York spot price in the beginning of 1987 but remained close for the rest of the year. Canada's petroleum products exports were made to 5 countries while imports came from at least 13 countries. The USA remained Canada's largest trading partner in petroleum products. Exports to Japan and the Far East rose ca 60% over 1986. Product outturns for export were 9% of total Canadian refinery throughput. Exports of aviation turbine fuel from Ontario began in April 1987. The top single exporter in Canada was Irving Oil Ltd. with 2,485,000 m 3 . Irving was also the top exporter in 1986. 11 figs., 4 tabs

  9. Bibliography of NRL Publications--1988

    Science.gov (United States)

    1990-10-31

    Biochemistry . Review 8 38:2140-2 1lJ6, 1988 Society of Photo-Optical Instrumentation Engineers, Bellingham, WA, 1988 Effects of Self-Propagating Synthesis...P.C.,* Analvtical Chemistr. T.L., Seib, K.D., Smuda, J.W., Singh, A., Ahl, 60:2801-2811, 1988 P., Ayers. M.E., Dalziel, A., and Yager. P., 0 Medical ...L Ananithakrishnan S Bayles RA Blue JE Ancona MG Babu RS Bayne S Bluem H Anderson DE Bacalis NC Beach LA Bodanszky M 0 Anderson GS Baer RN Beacon

  10. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  11. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  12. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  13. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  14. AGS experiments---1987, 1988, 1989

    International Nuclear Information System (INIS)

    Depken, J.C.

    1989-04-01

    This report contains: Experimental Areas Layout; Table of Beam Parameters and Fluxes; Experiment Schedule ''as run''; Experiment Long Range Schedule; A listing of experiments by number; Two-page summaries of each experiment begin here, also ordered by number; Publications of AGS experiments; and List of experimenters

  15. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  16. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  17. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  18. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  19. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  20. SKB annual report 1987

    International Nuclear Information System (INIS)

    1988-05-01

    The annual report on the activities of the Swedish Nuclear Fuel and Waste Management contains in part I an overview of SKB activities in different fields. Part II gives a description of the research and development work on nuclear waste disposal performed during 1987. Lectures and publications during 1987 as well as reports issued in the SKB technical report series are listed in part III. Part IV contains the summaries of all technical reports issued during 1987. At Forsmark the first construction phase for the final repository for radioactive waste - SFR - is now completed. The repository is situated in crystalline rock under the Baltic Sea. The first construction phase includes rock caverns for 60 000 m 3 of waste. A second phase for additional 30 000 m 3 is planned to be built and commissioned around the year 2000. (orig./DG)

  1. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  2. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  3. 40 CFR 85.1403 - Particulate standard for pre-1994 model year urban buses effective at time of engine rebuild or...

    Science.gov (United States)

    2010-07-01

    ...) DDC 6V92TA 1979-1987 0.50 0.30 1988-1989 0.30 0.10 DDC 6V92TA DDECI 1986-1987 0.30 0.30 DDC 6V92TA DDECII 1988-1991 0.31 0.10 1992 0.25 0.10 1993 (no trap) 0.25 0.10 1993 (trap) 0.07 0.07 DDC Series 50 1993 0.16 0.10 DDC 6V71N 1973-1987 0.50 0.50 1988-1989 0.50 0.10 DDC 6V71T 1985-1986 0.50 0.50 DDC...

  4. Synchronous response of sedimentary organic carbon accumulation on the inner shelf of the East China Sea to the water impoundment of Three Gorges and Gezhouba Dams

    Science.gov (United States)

    Lin, Jia; Zhu, Qing; Hong, Yuehui; Yuan, Lirong; Liu, Jinzhong; Xu, Xiaoming; Wang, Jianghai

    2018-01-01

    Coastal seas, located between continents and the open ocean, are an important active carbon pool. The sedimentary total organic carbon (TOC) in these areas is a mixture of terrestrial and marine sources, and can be a powerful proxy for tracing natural processes and human activities. In this study, one fine-grained sediment core (DH5-1) from the inner shelf of the East China Sea was systematically analyzed for TOC and black carbon (BC) contents and TOC stable carbon isotope ratios (δ13C). By combining these data with 210Pb dating, an improved carbon correction model and a two end-member mixing model, we reconstructed century-scale high-resolution sequences of corrected TOC, terrestrial TOC and marine TOC contents and identified two carbon depletion events in the DH5-1 record. The two events, shown as two minima in the TOC profiles, correspond temporally to 1985-1987 AD and 2003-2006 AD, which exactly matches the water impoundment of the Gezhouba Dam and Three Gorges Dam, respectively. In addition, the variations in TOC contents and δ13C values before, during or after the minima demonstrate a relationship between the depletion events and water impoundment of the dams on the Changjiang River. The TOC reductions may represent synchronous responses of sedimentary TOC and resultant ecological effects on the inner shelf of the East China Sea to the water impoundment of the dams. These new TOC records reflect the interaction between natural and anthropogenic processes and, accordingly, provide a deep insight and important references for assessing marine ecological effects resulting from water impoundment of largescale dams.

  5. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  6. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  7. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  8. Potential impacts of damming the Juba Valley, western Somalia: Insights from geomorphology and alluvial history

    Science.gov (United States)

    Williams, Martin

    2014-05-01

    In 1988 plans were well advanced to dam the Juba River in western Somalia. The aims of the Baardheere Dam Project were to generate hydroelectric power for the capital Mogadishu, and to provide water for irrigation in the Juba Valley. A reconnaissance survey on foot along 500 km of the river upstream of the proposed dam site at Baardheere and detailed geomorphic mapping from air photos provided a basis for reconstructing the late Quaternary alluvial history of the river and for assessing the potential impact of the proposed dam. The Juba River rises in the Ethiopian Highlands and is the only river in Somalia that flows to the sea. Its history reflects climatic events in Ethiopia, where the Rift Valley lakes were very low during the LGM (21±2 ka), and high for about 5, 000 years before and after then. Cave deposits in Somalia indicate wetter conditions at 13, 10, 7.5 and 1.5 ka. Alluvial terraces in the Juba Valley range in age from late Pleistocene to late Holocene but only attain a few metres above the present floodplain. This is because the dry tributary valleys contain limestone caves and fissures that divert any high flows from the parent river underground, a process not known when the project was first approved. The oldest preserved terrace was cemented by calcrete by 40 ka. Alluvial gravels were deposited at the outlet of dry tributary valleys during times of episodic high-energy flow between 26 ka and 28 ka. Finely laminated shelly sands accumulated at 10 ka to form the 5 m terrace. The 2 m terrace was laid down 3.2 ka ago as a slackwater deposit. The lack of high-level alluvial terraces raises doubts over plans to dam the river, since rapid leakage would occur from side valleys and the reservoir would not attain the height needed to generate hydroelectric power. It would submerge all existing arable land along the river. Finally, the presence in the late Holocene alluvium of the sub-fossil gastropods Bulinus truncatus and Biomphalaria pfeifferi, which are

  9. Activity report 1988-1989

    International Nuclear Information System (INIS)

    Dagnegaard, E.; Johansson, Rolf.

    1989-12-01

    This report covers the activities of the department during the period 1 July 1988 - 30 June 1989, which is the academic year 1988/89. Research has continued in established areas such as adaptive control, computer aided control engineering, robotics, and information technology. The program package Simnon, that has been developed at the Department, is now available for mainframes, IBM-PC compatibles, and Sun workstations

  10. Status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam, annual progress report, July 1986 - March 1987.; ANNUAL

    International Nuclear Information System (INIS)

    Oregon Department of Fish and Wildlife; Washington Department of Fisheries

    1987-01-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts

  11. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  12. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  13. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  14. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  15. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  16. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  17. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  18. Jet joint undertaking annual report 1988

    International Nuclear Information System (INIS)

    1989-07-01

    The 1988 activity report of the Joint European Torus (JET) project, is presented. The report provides an overview of the scientific, technical and administrative status of the program. The background of the project, the description of JET and Euratom and International Fusion Programs are explained. The technical status of the machine is given and it includes: technical changes and achievements during 1988; details of the operational organisation of experiments and pulse statistics; and progress on enhancements in machine systems for future operations. The results of JET operations in 1988, under various conditions of heating and combined scenarios in different magnetic field configurations, are provided. The project budget situation, contractual arrangements, in 1988, and staff complements, are included

  19. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  20. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  1. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  2. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  3. A study on the effect of a broken large sabo dam on the sediment transportation in channel - an example of Baling-sabo-dam

    Science.gov (United States)

    Tseng, W. H.; Shieh, C. L.; Lee, S. P.; Tsang, Y. C.

    2009-04-01

    To retard the sediment transportation and its effect on the reservoir, large sabo dams are built in the main channel of the reservoir watershed in Taiwan. Therefore, these large sabo dams affect upstream, downstream, and the reservoir significantly if the dam breaks. There was about 450 mm of rain fell in the reservoir watershed during typhoon Wipha that struck Taiwan on 17-19, September, 2007. This heavy rainfall caused the Baling-sabo-dam broken about 60 m of the upper Dahan Creek in the Shimen Reservoir watershed. The dam, built in 1977, is 38 m in height, 80 m in width, and is designed to reserve sediment materials about 10 million m3. The upper river bed was diminished maximum to 20 m in a month; the deposited and affected areas are unable to estimate and still required to be observed. The main purpose of this paper is to analyze the topographic characteristic of the channel after the dam broke according to the topographic and surveyed data before and after the dam broke. The longitudinal profile and the cross section data show the effects to the channel after the dam break and the channel is able to classify in several sections. A simple comparison of the sediment discharge estimated from the hydrologic data with the topographic survey data is also analyzed. Keywords:dam break, sabo dam, sediment discharge

  4. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  5. Risoe annual report 1987

    International Nuclear Information System (INIS)

    1988-06-01

    An explanation of Risoe National Laboratory's function within the Danish research system is followed by brief accounts of research activities at Risoe during 1987. Energy resources, technology and policy are discussed, the annual accounts are presented, a guide to the National Laboratory and a list of its publications are given. Some of the research activities that took place in 1987 described in more detail are within the fields of chemistry and the environment, superconductivity, new aspects of powdery mildew, polymers and robotics. (AB)

  6. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  7. STABILITAS CHECK DAM DI ARBORETUM DESA SUMBER BRANTAS

    Directory of Open Access Journals (Sweden)

    Endang Purwati

    2012-09-01

    Full Text Available Abstract: The stability of check-dam in arboretum of Sumber Brantas village. Sumber Brantas water sources area is arboretum territory which has to be maintained as conservation either for technical or vegetation (plants cover by sustainable development. Arboretum territory is made as asylum in irrigation system district of Brantas River. This research discusses technical conservation activity to build the check dam in conserving the area. Check dam is built dimensionally by using HEC-RAS Program to get safe and stable dimension for rolling, shifting and piping of Sf > 1.5, and based on hydrologic analysis to get maximum flood discharge of 48.01 m3second-1. Hydraulic analysis is used to get water level profile and pressure for the dam body. Stability of the structure will be controlled by construction load (weight of check dam and its fully sediment storage condition. The result of this research shows that the safe and stable dimension for check dam are as follows: 28 meter of width; 3 meter of main height; 1.5 meter of sub-height; 10 meter of stilling basin length (Main Dam–Sub Dam.

  8. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  9. Gamma-Ray Imaging Spectrometer (GRIS) instrument and plans for serving SN 1987A

    International Nuclear Information System (INIS)

    Tueller, J.; Barthelmy, S.; Gehrels, N.; Teegarden, B.J.; Leventhal, M.; MacCallum, C.J.

    1988-01-01

    The Gamma-Ray Imaging Spectrometer (GRIS) is a powerful second-generation high-resolution gamma-ray spectrometer. It consists of an array of seven large (typically >200 cm 3 ) n-type Germanium detectors surrounded by a thick (15 m) NaI active shield. Its energy range is 0.02 to 10 MeV. A new detector segmentation technique will be employed to reduce the detector background. The β-decay background component, which is expected to be dominant in the 0.2--2 MeV range, will be suppressed by roughly a factor of 20. The 3σ GRIS sensitivity to a narrow Fe line at 847 keV (expected to be the most intense from a supernova) will be ∼2 x 10 -4 photons/cm 2 -s for an 8 hr observation of the LMC over Alice Springs, Australia with unsegmented detectors. The instrument in simplified form will be ready to observe SN 1987A in early 1988

  10. The blind men meet the elephant at the dam: Alternative spatial and taxonomic components reveal different insights about how low-head dams impact fish biodiversity

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Smith, Joseph M.; Hitchman, Sean M.

    2017-01-01

    Dams are ubiquitous environmental impacts that threaten aquatic ecosystems. The ability to compare across research studies is essential to conserve the native biodiversity that is impacted by the millions of low‐head dams that currently fragment streams and rivers. Here, we identify a previously unaddressed obstacle that impedes this generalization. Specifically, divergent spatial and taxonomic approaches that result from different conceptualizations of the dam‐biodiversity problem can produce conflicting science‐based conclusions about the same dam impact. In this research, using the same dammed and undammed sites, we evaluated the scientific generality of different conceptualizations of the dam‐biodiversity problem. We compared two different but commonly used spatial approaches—(1) above dam–below dam vs. (2) undammed–dammed comparisons—and 11 different, commonly used taxonomic approaches (three assemblage summaries, eight guilds). Sites above the dam structure had less diverse fish assemblages than sites below dams, whereas sites below the dam structure were similar to undammed sites. Thus, spatial approach 1 detected a large dam effect and spatial approach 2 detected a small dam effect. Similarly, some taxonomic responses (species richness, diversity, abundance, and number of guilds) detected large dam effects; other responses detected small (riffle specialist guild) or no dam effects (pool generalists). In summary, our results showed that how the problem was framed altered scientific conclusions and created different dam realities. The metaphor of how individual blind men disagree about the structure of an elephant, based on examinations of different body parts, reinforces the need for a coordinated, holistic perspective on dam research. Although no single approach is adequate for all problems, identifying the form, consequences of, and relationships among different research conceptualizations will set the stage for future syntheses of dam

  11. Progress report on safety research of high-level waste management for the period April 1987 to March 1988

    International Nuclear Information System (INIS)

    Nakamura, Haruto; Tashiro, Shingo

    1988-10-01

    Researches on high-level waste management at the High Level Waste Management Laboratory and the Waste Safety Testing Facility Operation Division of the Japan Atomic Energy Research Institute in the fiscal year of 1987 are reviewed in the three sections of the report. The topics are as follows: 1) On performance and durability of waste forms and engineered barrier materials, accelerated alpha radiation stability of glass form and Synroc has been investigated and stress corrosion cracking of canister materials was examined under simulated conditions. 2) Sorption of 237 Np on granite samples and behavior of iron during weathering of granites were studied with respect to safety evaluation for geological disposal. 3) Actual waste was transported from the Tokai Reprocessing Plant and hot operation using the actual waste was initiated at WASTEF. (author)

  12. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  13. Report on the year 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report gives a survey of the operation of the nuclear power plant 'Dodewaard' during 1987. A summary is given of the findings of the OSAR team and of the state of affairs with regard to COVRA, inter-national developments, judicial procedures, information, radiation control, waste processing and exploitation during 1987. Finally future perspectives are outlined. (H.W.). 3 fotos; 1 tab

  14. Physics Division progress report for period ending September 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Livingston, A.B. (ed.)

    1989-03-01

    This report covers the research and development activities of the Physics Division for the 1988 fiscal year, beginning October 1, 1987, and ending September 30, 1988. The activities of this Division are concentrated in the areas of experimental nuclear physics, experimental atomic physics, and theoretical nuclear and atomic physics. Operation of the Holifield Heavy Ion Research Facility as a national user facility continues to represent the single largest activity within the Division. This year saw the completion of the acceleration tube upgrade of the 25-MV tandem electrostatic accelerator and the achievement of record terminal potentials, operation for an experiment with 25 million volts on terminal, and successful tests with beam at 25.5 MV. The experimental nuclear physics program continues to be dominated by research utilizing heavy ions. These activities, while continuing to center largely on the Holifield Facility, have seen significant growth in the use of facilities that provide intermediate energies and especially ultrarelativistic beams. The UNISOR program, since its inception, has been intimately associated with the Division and, most particularly, with the Holifield Facility. In addition to the Holifield Facility, the Division operates two smaller facilities, the EN Tandem and the ECR Ion Source Facility, as ''User Resources.'' The efforts in theoretical physics, covering both nuclear and atomic physics, are presented. In addition to research with multicharged heavy ions from the ECR source, the effort on atomic physics in support of the controlled fusion program includes a plasma diagnostics development program. The concentration of this program on optical and laser technology is marked by the change in designation to the Laser and Electro-Optics Lab. A small, continuing effort in elementary particle physics, carried out in collaboration with the University of Tennessee, is reported.

  15. Physics Division progress report for period ending September 30, 1988

    International Nuclear Information System (INIS)

    Livingston, A.B.

    1989-03-01

    This report covers the research and development activities of the Physics Division for the 1988 fiscal year, beginning October 1, 1987, and ending September 30, 1988. The activities of this Division are concentrated in the areas of experimental nuclear physics, experimental atomic physics, and theoretical nuclear and atomic physics. Operation of the Holifield Heavy Ion Research Facility as a national user facility continues to represent the single largest activity within the Division. This year saw the completion of the acceleration tube upgrade of the 25-MV tandem electrostatic accelerator and the achievement of record terminal potentials, operation for an experiment with 25 million volts on terminal, and successful tests with beam at 25.5 MV. The experimental nuclear physics program continues to be dominated by research utilizing heavy ions. These activities, while continuing to center largely on the Holifield Facility, have seen significant growth in the use of facilities that provide intermediate energies and especially ultrarelativistic beams. The UNISOR program, since its inception, has been intimately associated with the Division and, most particularly, with the Holifield Facility. In addition to the Holifield Facility, the Division operates two smaller facilities, the EN Tandem and the ECR Ion Source Facility, as ''User Resources.'' The efforts in theoretical physics, covering both nuclear and atomic physics, are presented. In addition to research with multicharged heavy ions from the ECR source, the effort on atomic physics in support of the controlled fusion program includes a plasma diagnostics development program. The concentration of this program on optical and laser technology is marked by the change in designation to the Laser and Electro-Optics Lab. A small, continuing effort in elementary particle physics, carried out in collaboration with the University of Tennessee, is reported

  16. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    increase in hatchery Chinook catch in 2002 was due to a 3.1 fold increase in hatchery production and differences in flow between years. Changes in hatchery and wild steelhead catch are probably due to differences in flow between years. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2002 data detected a relation between migration rate and discharge for hatchery and wild Chinook salmon. For hatchery and wild Chinook salmon there was a 4.7-fold and a 3.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 1.8-fold and a 1.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2002 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for wild Chinook salmon and hatchery steelhead trout. The analysis was unable to detect a relation between migration rate and discharge for hatchery Chinook salmon. The lack of a detectable relation was probably a result of the migration rate data being spread over a very narrow range of discharge. Not enough data were available to perform the analysis for wild steelhead trout. Migration rate increased 4.3-fold for wild Chinook salmon and 2.2-fold for hatchery steelhead between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth

  17. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  18. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  19. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  20. Libby/Hungry Horse Dams Wildlife Mitigation Habitat Protection : Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1991-04-01

    The Columbia River Basin Fish and Wildlife Program identified mitigation goals for Hungry Horse and Libby dams (1987). Specific programs goals included: (1) protect and/or enhance 4565 acres of wetland habitat in the Flathead Valley; (2) protect 2462 acres of prairie habitat within the vicinity of the Tobacco Plains Columbian sharp-tailed grouse; (3) protect 8590 acres riparian habitat in northwest Montana for grizzly and black bears; and (4) protect 11,500 acres of terrestrial furbearer habitat through cooperative agreements with state and federal agencies and private landowners. The purpose of this project is to continue to develop and obtain information necessary to evaluate and implement specific wildlife habitat protection actions in northwestern Montana. This report summarizes project work completed between May 1, 1990, and December 31, 1990. There were three primary project objectives during this time: obtain specific information necessary to develop the mitigation program for Columbian sharp-tailed grouse; continue efforts necessary to develop, refine, and coordinate the mitigation programs for waterfowl/wetlands and grizzly/black bears; determine the opportunity and appropriate strategies for protecting terrestrial furbearer habitat by lease or management agreements on state, federal and private lands. 19 refs., 1 tab.

  1. Thermal monitoring of leakage through Karkheh embankment dam, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mirghasemi, A.A.; Bagheri, S.M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering; Heidarzadeh, M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering]|[Mahab Ghodss Consulting Engineers, Tehran (Iran, Islamic Republic of)

    2007-07-01

    A newly developed and simple method for monitoring seepage in embankment dams was presented. The method of temperature measurement is based on the fact that a change in permeability results in a change in seepage flow, thereby causing a temperature change that can be readily measured in the dam body and foundation. In this study, water leaking through the Karkheh embankment dam was thermally analyzed to determine a pattern and amount of water seepage. With nearly 33 million cubic metres of fill, the Karkheh earth and rock-fill dam is the largest dam in Iran. Construction was completed in 2000. The thermal processes in the embankment were studied due to the dam's complex thermo-hydraulic behaviour. Thermal data was collected and analyzed during construction and operation of the dam. This paper presented the temperature variations for the different dam zones, including core, upstream shell, downstream shell, upstream filter, downstream filter and the plastic concrete cut-off wall. It was determined that the clay core works very well as an impermeable curtain. It was also shown that temperature variations of the Karkheh reservoir water is seasonal, and decrease as water depth increases. The reservoir water temperature remains constant beyond depths of 60 metres. The thermal behaviour of the core is not similar to that of the reservoir, indicating a very low value of seepage through the core. The pattern of temperature variations in the upstream shell in the left abutment is harmonic, while in the right abutment it is not harmonic. A harmonic pattern of temperature variation exists in some aquifers of the dam foundation, indicating high seepage through these aquifers. The Karkheh dam cut-off wall performs satisfactorily. It was determined that one dimensional equations for estimating seepage cannot be applied for the Karkheh dam. 17 refs., 11 figs.

  2. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  3. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  4. Plugs or flood-makers? the unstable landslide dams of eastern Oregon

    Science.gov (United States)

    Safran, Elizabeth B.; O'Connor, Jim E.; Ely, Lisa L.; House, P. Kyle; Grant, Gordon E.; Harrity, Kelsey; Croall, Kelsey; Jones, Emily

    2015-01-01

    Landslides into valley bottoms can affect longitudinal profiles of rivers, thereby influencing landscape evolution through base-level changes. Large landslides can hinder river incision by temporarily damming rivers, but catastrophic failure of landslide dams may generate large floods that could promote incision. Dam stability therefore strongly modulates the effects of landslide dams and might be expected to vary among geologic settings. Here, we investigate the morphometry, stability, and effects on adjacent channel profiles of 17 former and current landslide dams in eastern Oregon. Data on landslide dam dimensions, former impoundment size, and longitudinal profile form were obtained from digital elevation data constrained by field observations and aerial imagery; while evidence for catastrophic dam breaching was assessed in the field. The dry, primarily extensional terrain of low-gradient volcanic tablelands and basins contrasts with the tectonically active, mountainous landscapes more commonly associated with large landslides. All but one of the eastern Oregon landslide dams are ancient (likely of order 103 to 104 years old), and all but one has been breached. The portions of the Oregon landslide dams blocking channels are small relative to the area of their source landslide complexes (0.4–33.6 km2). The multipronged landslides in eastern Oregon produce marginally smaller volume dams but affect much larger channels and impound more water than do landslide dams in mountainous settings. As a result, at least 14 of the 17 (82%) large landslide dams in our study area appear to have failed cataclysmically, producing large downstream floods now marked by boulder outwash, compared to a 40–70% failure rate for landslide dams in steep mountain environments. Morphometric indices of landslide dam stability calibrated in other environments were applied to the Oregon dams. Threshold values of the Blockage and Dimensionless Blockage Indices calibrated to worldwide

  5. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  6. The 20th anniversary of SN1987A

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, A [KEK, High Energy Accelerator Research Organization, Oho 1-1, Tsukuba, Ibaragi, 305-0801 (Japan)], E-mail: atsuto.suzuki@kek.jp

    2008-07-15

    Observation of a neutrino burst from the supernova, SN1987A opened a new window of observational astronomy by neutrinos. And the history showed that the SN1987A neutrino burst observation was the vanguard of successive discoveries of neutrino properties by Super-Kamiokande, SNO, K2K, KamLAND and so on. On the occasion of the SN1987A 20th anniversary, the backstage story up to the discovery of the SN1987A neutrino bursts is summarized, tracing the Kamiokande log-note and including the IMB, LSD and Baksan data.

  7. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  8. Report on the year 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report gives a survey of the operation of the nuclear power plant 'Dodewaard' during 1988. a summary is given of the state of affairs with regard to new housing developments (for the education group), COVRA, international developments, judicial procedures, information, radiation control, waste processing, exploitation during 1988, and future perspectives are outlined. (H.W.). 2 figs.; 8 fotos; 3 tabs

  9. Dynamic analyzing procedures adopted for concrete-faced rockfill dams in Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Tosun, H. [Dam Safety Association, Ankara (Turkey); Tosun, K. [TVT Hydrotech Bureau, Ankara (Turkey)

    2008-07-01

    A concrete faced rockfill dam (CFRD) has some advantages compared to other embankment types. The advantages include minimal settlement problems through the use of compacted rockfill; increased overall stability of the dam since the water pressure acts on the upstream face; and pore water pressure does not develop in the rockfill zone if it is well designed and constructed. It is thought that well-compacted CFRD has a high resistance to earthquake loading, as based on several factors including acceptable past performance of similar dams. While numerical solutions performed for this type of dams indicate that it is as safe as other embankment dams, their behavior is still questionable when they are subjected to severe seismic loading. This paper outlined the key principals of the dynamic analyzing method adopted for CFRDs in Turkey and summarized the practice of CFRDs with heights ranging from 54 to 135 metres throughout the country. Two-dimensional finite element models were executed to estimate displacements on the crest under the different loadings of earthquake. Dams that were discussed included the Kurtun Dam, the Torul Dam, the Atasu Dam, the Dim Dam, the Gordes Dam, and the Marmaris Dam. The paper also discussed the limitation about permanent settlement provided in the national dam specification and introduced the results obtained from a case study of the Pamukluk Dam located in southern Turkey. Geology and geotechnics as well as the embankment details and materials were discussed. The case study also summarized the selection of seismic parameters and dynamic analyses. 35 refs., 1 tab., 8 figs.

  10. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  11. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  12. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  13. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  14. Texas A and M University, Nuclear Science Center: Twenty-fourth progress report, January 1, 1987-December 31, 1987

    International Nuclear Information System (INIS)

    Crawford, K.C.; Davis, J.W.; Krohn, J.L.; Meyer, C.M.; Petesch, J.E.; Stasny, G.S.

    1988-03-01

    Utilization of the reactor (NSCR Reactor) during 1987 increased slightly over that in 1986. The main activity is shifting from isotope tracer production to testing and exposure irradiations. Core VIII-A, operational since March 1986, was used throughout 1987

  15. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  16. Studies of Columbia River water quality

    International Nuclear Information System (INIS)

    Onishi, Y.; Johanson, P.A.; Baca, R.G.; Hilty, E.L.

    1976-01-01

    The program to study the water quality of the Columbia River consists of two separate segments: sediment and radionuclide transport and temperature analysis. Quasi-two dimensional (longitudinal and vertical directions) mathematical simulation models were developed for determining radionuclide inventories, their variations with time, and movements of sediments and individual radionuclides in the freshwater region of the Columbia River below Priest Rapids Dam. These codes are presently being applied to the river reach between Priest Rapids and McNary Dams for the initial sensitivity analysis. In addition, true two-dimensional (longitudinal and lateral directions) models were formulated and are presently being programmed to provide more detailed information on sediment and radionuclide behavior in the river. For the temperature analysis program, river water temperature data supplied by the U. S. Geological Survey for six ERDA-sponsored temperature recording stations have been analyzed and cataloged on storage devices associated with ERDA's CDC 6600 located at Richland, Washington

  17. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  18. Uranium Resources, production and demand

    International Nuclear Information System (INIS)

    1988-01-01

    Periodic assessments of world uranium supply and demand have been conducted by the OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) since the mid 1960s. Published every two years, the report URANIUM RESOURCES, PRODUCTION AND DEMAND, commonly referred to as the RED BOOK, has become an essential reference document for nuclear planners and policy makers in the international nuclear community. The latest Red Book, published in 1988, was based on data collected mainly in early 1987. Most of the data for 1987 were therefore provisional. The STATISTICAL UPDATE 1988 provides updated 1987 data collected in 1988 and provisional data for 1988. The publication, which covers OECD Countries and gives Secretariat estimates for the rest of the World Outside Centrally Planned Economies (WOCA), is being issued every second year, between publications of more complete Red Books

  19. SN1987A's Twentieth Anniversary

    Science.gov (United States)

    2007-02-01

    Looking back at 20 Years of Observations of this Supernova with ESO telescopes The unique supernova SN 1987A has been a bonanza for astrophysicists. It provided several observational 'firsts,' like the detection of neutrinos from an exploding star, the observation of the progenitor star on archival photographic plates, the signatures of a non-spherical explosion, the direct observation of the radioactive elements produced during the blast, observation of the formation of dust in the supernova, as well as the detection of circumstellar and interstellar material. ESO PR Photo 08a/07 ESO PR Photo 08a/07 SN1987A in the Large Magellanic Cloud Today, it is exactly twenty years since the explosion of Supernova 1987A in the Large Magellanic Cloud was first observed, at a distance of 163,000 light-years. It was the first naked-eye supernova to be seen for 383 years. Few events in modern astronomy have met with such an enthusiastic response by the scientists and now, after 20 years, it continues to be an extremely exciting object that is further studied by astronomers around the world, in particular using ESO's telescopes. When the first signs of Supernova 1987A, the first supernova of the year 1987, were noticed early on 24 February of that year, it was clear that this would be an unusual event. It was discovered by naked-eye and on a panoramic photographic plate taken with a 10-inch astrograph on Las Campanas in Chile by Oscar Duhalde and Ian Shelton, respectively. A few hours earlier, still on 23 February, two large underground detectors - in Japan and the USA - had registered the passage of high-energy neutrinos. Since SN 1987A exploded in the Large Magellanic Cloud (LMC), it was only accessible to telescopes in the Southern Hemisphere, more particularly in Australia, South Africa, and South America. In Chile, ESO's observatory at La Silla with its armada of telescopes with sizes between 0.5 and 3.6-m, played an important role. ESO PR Photo 08c/07 ESO PR Photo 08c/07 The

  20. US/Japan Cooperation in High Energy Physics. Review of activities, 1988--1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-16

    The objective of the Implementing Arrangement was to further the energy programs of both countries by establishing a framework for cooperation in the field of high energy physics, including research, accelerator and detector instrumentation research and development, the fabrication and subsequent use of new experimental devices and facilities, and related joint efforts as may be mutually agreed. Over the years, this cooperation has been very effective and has strengthened the overall collaborative efforts and the understanding between our nations and their citizens. It has demonstrated to the world our ability to work together to attack difficult problems. High Energy Physics goes across national borders; the bond is clearly intellectual and common ground is shared for the benefit of all in a most effective manner. This review covers the activities conducted under the aegis of the US/Japan Committee for Cooperation in High Energy Physics during the past five years (1988--1993). This was the second such US review of the US/Japan cooperative activities; the first was held in 1987.

  1. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  2. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without

  3. Accidents in making fireworks. Tapaturmat polttopuun teossa

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H

    1991-01-01

    The accidents and the trends in the number of accidents and their causes were analyzed in a study conducted by the Forestry Department of the Work Efficiency Institute. The study was funded by the Finnish Agricultural Enterpreneurs' Pension Fund (MELA). The study material was selected from MELA's accident stage work and cause code. Altogether, the material comprised the following accidents that occurred while making and using firewood: 671 accidents in 1987 and 596 accidents in 1988. The amount of accidents caused by the working environment and hand tools was clearly higher in 1987 than in 1988. The number of accidents occurred while chopping wood was 20 % higher in 1987 than in 1988. April was the most accident-prone month both in 1987 and in 1988. Chopping of firewood was the most dangerous work stage in terms of the number of accidents. In 1988, the number of accidents in chopping firewood was 336, in sawing using circular saw 97 cases and other mechanized chopping led to 93 accidents. Heating with wood caused 33 accidents. In 1988 there were 10 (2 %) accidents involving loss of limbs and 9 of them occurred in the mechanized chopping of firewood. Nine accidents of these involved the loss of one or more fingers. Serious accidents, leading to inability to work for more than 3 months, were most frequent in chopping and in storing firewood.

  4. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  5. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  6. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  7. The 1988 Drought, Barges, and Diversion.

    Science.gov (United States)

    Changnon, Stanley A.

    1989-09-01

    The drought of 1988 rated as one of the nation's worst in the past 100 years, resulting in a myriad of impacts and responses. A notable, largely unexpected impact involved stoppages of barge traffic on the lower Mississippi River during June and July, a result of shallow areas produced by record low flows and shoaling. The barge industry hauls 45% of all bulk commodities (grains, coal, petroleum) shipped in the central United States. The low flows were a result of the unusually large areas extent of drought conditions across most of the Mississippi Basin, which comprises 40% of the continental United States. Most 1987 months had been relatively warm and dry, minimizing moisture in the soils and shallow ground water. Then deficient snowmelt (due to low winter snow-falls) and record low spring 1988 precipitation combined to produce the record low flows along much of the Mississippi River.Most responses to the drought came in a crisis mode and included concentrated dredging to open channels, government enforced reductions in barge loads and in numbers of barges per tow, tripled barge shipping rates, and shifts in transportation modes. The barge industry suffered a 20% income loss. The total losses to the barge industry coupled with higher costs for shipping were $1 billion. The Illinois Central Railroad, which parallels the major blocked waterways, used a climate prediction to anticipate the low flows 3 months in advance. They leased additional cars to help handle the increased shipments transferred from barges and made a sizable profit. A response proposed by Illinois and shippers-a temporary increase in the water diverted from lake Michigan to raise the levels on the lower Mississippi River-was met with strong objections by other lake states and Canada. The federal government declined the proposal, but the sizable controversy it engendered reflects the growing sensitivity to water resources issues in the Great Lakes Basin and is also illustrative of problems to be

  8. Grouting design for slope stability of kedung uling earthfill dam

    Directory of Open Access Journals (Sweden)

    Najib

    2018-01-01

    Full Text Available Kedung Uling earthfill dam locates at Wonogiri Regency, Central Java, Indonesia. The dam encountered sliding and settlement at the embankment wall. To minimize sliding and settlement and to optimize the dam, both field investigation and laboratory tests have been proceeded for slope stability analysis and remedial embankment wall. Soil and rock investigation around the dam, which is followed by 10 core drillings, have been conducted. Laboratory tests such as direct shear and index properties have also been carried on. The results were further used for dam slope stability model using slide 6.0 and were used to analyzed factor of safety (FS of Kedunguling dam. 10 conditions of dam were simulated and strengthening body of dam with grouting was designed. The results showed two conditions, which are condition of maximum water level with and without earthquake at downstream, were unsatisfy Indonesia National Standard (SNI for building and infrastructure. These conditions can be managed by using grouting for increasing stabilization of embankment wall. By setting up grouting, factor of safety increases and meet the SNI standard requirement.

  9. Non uniform nature of recorded ground accelerations at dam foundation interface

    Energy Technology Data Exchange (ETDEWEB)

    Ghaemian, Mohsen; Gilani, Morteza Sohrabi [Sharif University of Technology, Tehran, (Iran, Islamic Republic of); Noorzad, Ali [Power and Water University of Technology, Tehran, (Iran, Islamic Republic of)

    2010-07-01

    The Karun III is a double curved concrete arch dam located in Iran which was used to investigate earthquake motions and dam responses. This paper presented the study of the Karun III dam foundation interface. Using an array of 15 accelerometers, two major events that occurred on 2007.11.20 and 2007.11.21 were recorded during dam operation with a PGA at crest of 0.312 g and 0.109.g respectively. A finite element model of Karun III dam was performed. The response of the Karun III dam during the 2007 earthquake was investigated using the NSAD-DRI program. It was found that the motion of the dam foundation interface is non-uniform. There is a time shift and amplification at the abutment compared to those at the base of the dam. The results showed that the spatially varying earthquake assumption is in good agreement with the recorded displacement of the dam.

  10. Evolution of the Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.

    2003-02-28

    To assist in deriving biological specifications for design of turbine rehabilitation measures, new ''fish-friendly'' turbines, and spillway designs and operations, scientists at the Pacific Northwest National Laboratory (PNNL) have developed and tested an autonomous multi-sensor device called a Sensor Fish that can acquire pressure and tri-axial linear acceleration data during passage through severe hydraulic conditions. The purpose of the Sensor Fish is to characterize physical conditions fish experience during passage through hydro turbines, spill stilling basins, high-discharge outfalls, and other dam passage routes. The Sensor Fish was developed with the support of the U.S. Department of Energy's Advanced Hydropower Turbine System program. Field tests of the Sensor Fish at Rock Island, McNary, The Dalles, Bonneville, and Wanapum dams on the Columbia River and the Prosser Irrigation District on the Yakima River have shown that the device can withstand the severe environments of turbine, spill, and fish bypass passage and provide useful environmental data that can ultimately aid in the design and operation of new and existing turbines, spill, and dam fish bypass facilities.

  11. Verifying Pressure of Water on Dams, a Case Study

    Directory of Open Access Journals (Sweden)

    Temel Bayrak

    2008-09-01

    Full Text Available Sensing and monitoring deformation pattern of dams is often one of the most effective ways to understand their safety status. The main objective of the present study is to find the extent to which rising reservoir level affects the mechanism of deformation of the Yamula dam under certain changes in the reservoir level conditions during the first filling period. A new dynamic deformation analysis technique was developed to analyze four geodetic monitoring records consisting of vertical and horizontal displacements of nine object points established on the dam and six reference points surrounding it, to see whether the rising reservoir level is responsible for the vertical and horizontal deformations during the first filling period. The largest displacements were determined in the middle points of the dam construction. There is an apparent linear relationship between the dam subsidence and the reservoir level. The dynamic deformation model was developed to model this situation. The model infers a causative relationship between the reservoir level and the dam deformations. The analysis of the results determines the degree of the correlation between the change in the reservoir level and the observed structural deformation of the dam.

  12. Frisby v. Schultz, 27 June 1988.

    Science.gov (United States)

    1988-01-01

    The plaintiffs, anti-abortion protesters, challenged a Brookfield Wisconsin ordinance making it "unlawful for any person to engage in picketing before or about the residence or dwelling of any individual" and declaring that the primary purpose of the ban is to "protec[t] and preserv[e] the home" through assurance "that members of the community enjoy in their homes . . . a feeling of well-being, tranquillity, and privacy." They claimed that the ordinance violated their First Amendment rights of free speech. The Court reversed lower court rulings finding the ordinance unconstitutional. It held that the ban on picketing did not ban all picketing in residential areas, but, rather, only "focused picketing" taking place solely in front of a specific residence, and that the ordinance left ample means of alternative channels of communication. It concluded that the ordinance served a significant government interest of protecting residential privacy and that there was no constitutional right to force speech into the home of an unwilling listener. In 1988, US courts reached the following decisions with respect to the activities of anti-abortion protesters: 1) action charging anti-abortionists with conspiracy under federal laws is allowed (Portland Feminist Women's Health Center vs. Advocates for Life, US District Court, D. Oregon, 28 June 1988 [712 F.Supp. 165]); 2) action charging anti-abortionists with conspiracy under federal laws not allowed, but action charging anti-abortionists with violation of racketeering laws allowed (Feminist Women's Health Center vs. Roberts, US District Court, W.D. Washington, 11 March 1988 [1988 US Dist. Lexis 16325]); 3) action charging anti-abortionists with violation of racketeering laws allowed (Northeast Women's Center, Inc. vs. McMonagle, US District Court, E.D. Pennsylvania, 31 March 1988 [689 F.Supp. 465]); and 4) action charging anti-abortionists with conspiracy under federal laws and with violation of racketeering laws is allowed (Roe

  13. Supernova mechanisms: Before and after SN1987a

    International Nuclear Information System (INIS)

    Kahana, S.H.

    1987-01-01

    The impact of SN1987a on theoretical studies of the specific mechanism generating Type II supernovae is examined. The explosion energy extracted from analysis of the light curve for SN 1987a is on the edge of distinguishing between a prompt explosion from a hydrodynamic shock and a delayed, neutrino-induced, explosion. The detection of neutrinos from 1987a is also reanalyzed. 30 refs., 2 tabs

  14. Detection of water leaks in the dam Joumine and study of sedimentation in the dam Ghezela by nuclear method

    International Nuclear Information System (INIS)

    Sari Souha

    2013-01-01

    The objective of this study is to determinate the paths of leaks observed in the dam Joumine and to identify the origin of salinity in the drain D2. In addition, the evaluation of the sedimentation measurement of suspended elements in the dam Ghezela is our second objective. The Joumine dam located in the North-east of Tunisia (governorate of Bizerte), was built in 1983 has an upstream watershed area of 418 km 2 . The reservoir capacity is 130 Mm 3 . This dam observed a water leakage from its implementation at the two drains D1 and D2 with a emerging flow rate reached a value close to 500 l/s, about 16 pour cent of its capacity. The injection of an insulating material in Karsts networks reduces the leakage rate to a value of 120 l / s in 1993 and 88 l / s in 2013, but this decrease was accompanied by an increase in salinity level in D2. The results from a multidisciplinary approach showed that the leakage path from the left bank of the reservoir where the leak was first detected, heading both D1 and D2 drains and the salinity in drain D2 due to the dissolution of the gypsum layer downstream of the dam and the contribution of brackish water from the left bank. The Ghezela dam located in the same area, was built in 1984 has an upstream watershed area of 48 km 2 . This dam has been an increase in sedimentation of 0.3 million m3 in 1994 to 1.7 million m 3 in 2010. In this study, the suspended elements were measured with a nuclear probe composed by a radioactive source of americium 241 and a NaI detector trained by a boat at different depth in the reservoir.

  15. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  16. Family Relationships Act Amendment Act, 1988 (No. 2 of 1988), 3 March 1988.

    Science.gov (United States)

    1989-01-01

    The Family Relationships Act Amendment Act, (No. 2 of 1988), of March 3, 1988, (Acts of the Parliament of South Australia, 1988) includes Part IIB: Surrogacy, defining "procuration contract" as meaning a contract under which a person agrees to negotiate, arrange, or obtain the benefit of, a surrogacy contract on behalf of another; or a person agrees to introduce prospective parties to a surrogacy contract. "Surrogacy contract" means a contract under which a person agrees to become pregnant or to seek to become pregnant' and to surrender custody of, or rights in relation to, a child born as a result of the pregnancy; or a person who is already pregnant agrees to surrender custody of, or rights in relation to, a child born as a result of the pregnancy. "Valuable consideration," in relation to a contract, means consideration consisting of money or any other kind of property that has a monetary value. A surrogacy contract is illegal and void. A procuration contract is illegal and void. A person who gives any valuable consideration user, or in respect of, a procuration contract may recover the amount or value of that consideration, as a debt, from the person to whom the consideration was given. A person who 1) receives valuable consideration under a procuration contract, or enters into such a contract in the expectation of receiving valuable consideration; 2) induces another to enter into a surrogacy contract, having received or in the expectation of receiving valuable consideration from a third person who seeks the benefit of that contract; or 3) publishes an advertisement of causes an advertisement to be published to the effect that 1) a person is or may be willing to enter into a surrogacy contract; 2) a person is seeking a person willing to enter into a surrogacy contract; or 3) a person is willing to negotiate, arrange, or obtain the benefit of a surrogacy contract on behalf of another, is guilty of an offence. The penalty is $4,000 or imprisonment for 12 months.

  17. Towards a dams safety management system for Angola

    OpenAIRE

    Camilo, V.; Silva, A.; Costa, R.; Barateiro, J.; Portela, E. A.; Fonseca, J.

    2015-01-01

    Dams have contributed to the human development and have brought many benefits, such as delivering hydropower, irrigating agricultural fields, supplying drinking water, or just for navigational and recreational purposes. Nevertheless, dams are critical structures that raise multiple concerns and risks associated with the ecological, social and economic impact. Angola has a rich and complex network of water basins and dams that serves different strategic purposes as defined in it...

  18. Remote Sensing of Deformation of a High Concrete-Faced Rockfill Dam Using InSAR: A Study of the Shuibuya Dam, China

    Directory of Open Access Journals (Sweden)

    Wei Zhou

    2016-03-01

    Full Text Available Settlement is one of the most important deformation characteristics of high concrete faced rockfill dams (CFRDs, >100 m. High CFRDs safety would pose a great threat to the security of people’s lives and property downstream if this kind of deformation were not to be measured correctly, as traditional monitoring approaches have limitations in terms of durability, coverage, and efficiency. It has become urgent to develop new monitoring techniques to complement or replace traditional monitoring approaches for monitoring the safety and operation status of high CFRDs. This study examines the Shuibuya Dam (up to 233.5 m in height in China, which is currently the highest CFRD in the world. We used space-borne Interferometric Synthetic Aperture Radar (InSAR time series to monitor the surface deformation of the Shuibuya Dam. Twenty-one ALOS PALSAR images that span the period from 28 February 2007 to 11 March 2011 were used to map the spatial and temporal deformation of the dam. A high correlation of 0.93 between the InSAR and the in-situ monitoring results confirmed the reliability of the InSAR method; the deformation history derived from InSAR is also consistent with the in-situ settlement monitoring system. In addition, the InSAR results allow continuous investigation of dam deformation over a wide area that includes the entire dam surface as well as the surrounding area, offering a clear picture continuously of the dam deformation.

  19. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  20. National Program for Inspection of Non-Federal Dams. Miller Pond Dam (CT 00154), Thames River Basin, Waterford, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1980-08-01

    Road and adjacent to the Brook are likely to be impacted by dam failure. Because a breach of Miller Pond Dam would cause severe economic loss and the...TO THE ASSUMED SPILL CREST ELEVATION 3 WATER %. WACE ELEATCRS. SHOREI I NE AND 7AI NGTER COGRATIONS ARE APPROXIMATE, AS OBTAINED Dl"F I -t DAM INSECTION

  1. Seismic Analysis of Concrete Dam by Using Finite Element Method

    Directory of Open Access Journals (Sweden)

    Rozaina Ismail

    2017-01-01

    Full Text Available This paper reports a brief study on linear seismic analysis of Sg. Kinta Concrete Dam. The analysis was conducted in order to determine the performance and behaviour of the dam under seismic excitation. The dam was modelled as two-dimensional and developed based on the design drawing that is obtained from Angkasa Consulting Services Sdn. Bhd. The seismic analysis of the dam is conducted using finite element analysis software package LUSAS 14.3 and the dam has been analyse as a plain stress problem with a linear consideration. A set of historic data, with E1 Centro earthquake acceleration of about 0.50g is used as an earthquake excitation. The natural frequency and mode shape up to fifth mode of the dam has been obtained from the analysis to show the differences of the stress and deformation between each mode. The maximum horizontal and vertical stress of Sg. Kinta dam was found and the distribution of them was discussed in form of contours. The deformation of the dam were also been discussed by comparing the maximum displacement for each mode shaped.

  2. Alteration of stream temperature by natural and artificial beaver dams.

    Science.gov (United States)

    Weber, Nicholas; Bouwes, Nicolaas; Pollock, Michael M; Volk, Carol; Wheaton, Joseph M; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool-water channel scale temperature refugia through enhanced groundwater-surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species.

  3. National Program for Inspection of Non-Federal Dams. Tihonet Pond Number 2 Dam (MA 00030), Massachusetts Coastal Basin, Wareham, Massachusetts. Phase I Inspection Report.

    Science.gov (United States)

    1981-07-01

    drainage area above the dam is 8.1 square miles. The watershed is characterized by irregular topography: cranberry bogs, small ponds and depressions ...and recreational purposes. Water from this pond is used in the U irrigation of cranberry bogs downstream. The maximum storage capacity of the dam is...295-1000 g. PURPOSE OF DAM The dam impounds Tihonet Pond which is a storage reservoir 4_- 4 4: . * used principally for irrigating cranberry bogs which

  4. Studies on environmental radioactivity in Finland in 1987

    International Nuclear Information System (INIS)

    Suomela, M.; Blomqvist, L.; Rahola, T.; Rantavaara, A.

    1991-03-01

    The detailed results of the surveillance of environmental radioactivity in 1987 are given in 10 supplementary reports to this 1987 annual report which summarizes only the data needed for radiation dose estimates. In 1987, two radionuclides, 137 Cs and 134 Cs originating in the fallout from the Chernobyl accident, were important in determining external and internal radiation doses. The population-weighted mean external dose rate in October 1987 was 0.037 x 10 - 6 Svh - 1. The decline in the dose rate was slower than predicted in 1986. The mean effective dose equivalent was 0.10 mSv in 1987, one third lower than in 1986. The predicted dose commitment from external radiation was estimated at 1.7 mSv. The internal radiation doses were calculated in two different ways, via estimation of dietary intake and using whole-body counting results. The intake estimate was obtained from the nationwide survey of radiocesium concentrations in foodstuffs and consumption statistics. The mean annual intake of 137 Cs was 14 000 and that of 134 Cs 5600 Bq in 1987. About half of the intake came from agricultural products, one third from fish and the rest from wild berries, mushrooms and game. The resulting committed effective dose equivalent, 0.3 mSv, provides an upper estimate for the mean internal dose in 1987. The population group whole-body counted was selected from the whole population in 1986 using stratified sampling. As in 1986, the 137 Cs and 134 Cs body burdens reflected the deposition activity in the region in which people lived. The mean committed effective dose equivalent for the whole population based on whole-body counting was 0.13 mSv. About 0.08 mSv of this dose was delivered in 1987. The contribution of 134 Cs was less than 40 per cent

  5. National Program for Inspection of Non-Federal Dams. Paper Mill Pond Dam (CT 00621), Connecticut River Basin, Vernon, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1981-03-01

    HYDROLOGIC AND HYDRAULIC COMPUTATIONS E INFORMATION AS CONTAINED IN THE NATIONAL INVENTORY OF DAMS ,v ’walL.it, AM I OVERVIEV \\ PHOTO Iv 390 L-( ibb~ ~5~4 N...AS-A144 539 NATIONAL PROGRAM FOR INSPEGTION 0F NON-FEDERAL DAMS / PAPER MIL POND DAM (.(U CORPS OF ENGINEERS WALTHAM A S MA NEW ENGLANA DIV MAR...CATALOG NUMBER CT 00621A 4 TITLE (amdSubtile) S. TYPE OF REPORT & PERIOD’COVERED Paper Mill Pond Dam INSPECTION REPORT NATIONAL PROGRAM FOR INSPECTION

  6. Things begin to happen around Supernova 1987A

    Science.gov (United States)

    1994-01-01

    On 23 February 1994, it will be exactly seven years since the explosion of Supernova 1987A in the Large Magellanic Cloud [1] was first observed, at a distance of approx. 160,000 light-years. It was the first naked-eye supernova to be seen in almost four hundred years. Few events in modern astronomy have met with such an enthusiastic response by the scientists and this famous object has been under constant surveillance ever since. After several years of relative quiescence, things are now beginning to happen in the immediate neighbourhood of SN 1987A. Recent observations with the ESO 3.5 m New Technology Telescope (NTT) indicate that interaction between the stellar material which was ejected during the explosion and the surrounding ring-shaped nebulae has started. This signals the beginning of a more active phase during which the supernova is likely to display a number of new and interesting phenomena, never before observed. SEVEN YEARS IN THE LIFE OF A SUPERNOVA After brightening to maximum light at about magnitude 3 a few months after the explosion, the long period of steady fading which is typical for supernovae, set in by mid-1987. The matter ejected by the explosion took the form of an expanding fireball, which began to spread through the nearly empty space around the supernova with a velocity of almost 10,000 km/sec. As it cooled, the temperature and therefore the total brightness decreased and the supernova became fainter and fainter. At the present moment, the magnitude of SN 1987A is about 18.5, that is almost 2 million times fainter than it was at maximum. Various phenomena have been observed around SN 1987A during the past years. Already in early 1988, light echoes were seen as concentric, slowly expanding luminous circles; they represent the reflections of the explosion light flash in interstellar clouds inside the Large Magellanic Cloud, between the supernova and us. In 1989, high-resolution observations with the NTT showed an elliptical ``ring

  7. Hydraulic fracture considerations in oil sand overburden dams

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Madden, B.; Danku, M. [Syncrude Canada Ltd., Fort McMurray, AB (Canada)

    2008-07-01

    This paper discussed hydraulic fracture potential in the dry-filled temporary dams used in the oil sands industry. Hydraulic fractures can occur when reservoir fluid pressures are greater than the minimum stresses in a dam. Stress and strain conditions are influenced by pore pressures, levels of compaction in adjacent fills as well as by underlying pit floor and abutment conditions. Propagation pressure and crack initiation pressures must also be considered in order to provide improved hydraulic fracture protection to dams. Hydraulic fractures typically result in piping failures. Three cases of hydraulic fracture at oil sands operations in Alberta were presented. The study showed that hydraulic fracture failure modes must be considered in dam designs, particularly when thin compacted lift of dry fill are used to replace wetted clay cores. The risk of hydraulic fractures can be reduced by eliminating in situ bedrock irregularities and abutments. Overpressure heights, abutment sloping, and the sloping of fills above abutments, as well as the dam's width and base conditions must also be considered in relation to potential hydraulic fractures. It was concluded that upstream sand beaches and internal filters can help to prevent hydraulic fractures in dams in compacted control zones. 5 refs., 16 figs.

  8. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    River blockages caused by landslide deposition are common phenomena in active mountain chains, influencing erosion-sedimentation patterns and acting as primary and secondary hazards. Regional scale analyses regarding their spatial distribution and morphometry allow establishing boundary conditions for their occurrence and stability, and determine differences among regions with different landscape and climatic conditions. Owing to the combination of endogenous and exogenous factors, landslide dams are frequent phenomena in the Andes. In the Argentinean NW and the Patagonian Andes, previous studies showed that stability of landslide dams determined by morphometric parameters generally matched satisfactorily with dam behavior, with some exceptions in which climatic component played an important role in dam longevity. Aiming to expand the knowledge of landslide dams in the Argentinean Andes, in this work we analyzed the stability of rock avalanche dams in the Pampeam flat slab subduction zone. In the study area, mountain dynamics creates suitable conditions for the occurrence of 34 rock avalanches with volumes up to 0.3 km3. They developed in deeply carved valleys (Cordillera) and Inter-thrust valleys (Precordillera). 22 impoundments of rivers resulted from channelized rock avalanches with long runouts (4-10 km) that blocked tributaries rivers, but most of them by rock avalanches that filled the valley bottom, with run up in the opposite slope and limited movement parallel to the valley axis. Most of the dams breached in unknown times, except for the last event that occurred on November 12th 2005. The quantification of morphometric parameters and contributing areas indicates the existence of dams with dimensionless blockage index above 2.75 (stable domain) and below 3.08 (instable domain). The Los Erizos dam in our study area and the Barrancas dam in the Patagonian Andes show that besides morphometric parameters, climatic conditions are decisive. Stable landslide dams

  9. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  10. Annual report of the Tandem Accelerator Center, University of Tsukuba, 1987

    International Nuclear Information System (INIS)

    1988-07-01

    This annual report covers the research activities and technical developments of the Tandem Accelerator Center, University of Tsukuba, in the period from April, 1987 to March, 1988. In the field of nuclear physics, the elastic and inelastic scattering of polarized protons from even-even medium weight nuclei was investigated systematically by light ion beam experiment. A QDQ type magnetic spectrograph for double scattering experiment was almost complete. The studies on heavy ion-induced fission reaction advanced by measuring anisotropy in fission angular distribution, and a view on the mechanism of the reaction was acquired. A new, ingenious technique enabled to identify prompt characteristics X-ray accompanying the fusion reaction induced by heavy ions. In the field of atomic and solid state physics, a strange dependence of equilibrium charge state on the atomic number of projectile heavy ions has been elucidated. The research on ion beam shadowing effect on the emission of ion-induced secondary electrons was continued. The Rutherford backscattering of O 4+ ions was applied to determine the composition of Y-Ba-Cu oxide film, and it shed light on the condition governing the nature of superconductive materials. The 12 UD Pelletron was operated quite satisfactorily. (Kako, I.)

  11. Responses of riparian reptile communities to damming and urbanization

    Science.gov (United States)

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  12. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  13. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    Directory of Open Access Journals (Sweden)

    Hai-ming Liu

    2018-01-01

    Full Text Available The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach segment, and artificial lake segment. The pore water pressure is obtained through solving the partial differential equation by separation variable method. On this basis, the dissipation and accumulation of pore water pressure of the upstream tailings dam are analyzed. The example of typical tailings is introduced to elaborate the applicability of the analytic solution. What is more, the application of pore water pressure in tailings dam is discussed. The research results have important scientific and engineering application value for the stability of tailings dam.

  14. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  15. Airborne and deposited radioactivity in Finland in 1987

    International Nuclear Information System (INIS)

    Aaltonen, H.; Saxen, R.; Ikaeheimonen, T.K.

    1990-04-01

    In the air surveillance programme concentrations of artificial radionuclides are monitored in the air close to the ground. In 1987, air dust samples were collected in Nurmijaervi, 40 km north of Helsinki and in Rovaniemi. When necessary, sampling was also launched in Helsinki. Several radionuclides originating from the accident in Chernobyl in 1987 could still be detected in air dust samples. A sharp decrease in the amounts of radioactive subtances deposited was noted at all the 18 sampling stations as against 1986. The total annual amounts of deposited 137 Cs varied at different stations in 1987 from 7.7 Bq/m 2 (Rovaniemi) to 1500 Bq/m 2 (Kauhava) and those of 90 Sr in 1986 from 4.7 Bq/m 2 (Taivalkoski) to 590 Bq/m 2 (Kuhmo) and in 1987 from 1.4 Bq/m 2 (Ivalo) to 38 Bq/m 2 (Kuhmo). The total annual amounts of 238 Pu and 239 , 240 Pu were 3.1 and 12 mBq/m 2 in Nurmijaervi and 3.4 and 14 mBq/m 2 and Lappeenranta in 1987, respectively. In 1987, resuspension of radionuclides was characteristic of the depostion situation. Due to this phenomenon, unexpectedly high contents of deposited radiocesium occurred occasionally in the samples, though the discharge caused by the Chernobyl accident lasted for only a short period in spring 1986. The proportion of 137 Cs originating from Chernobyl in 1987 varied from 3% to about 40% of the corresponding amounts in 1986 at different stations. The corresponding percentages for 90 Sr varied from 1.6% to 34%

  16. Changes in conifer and deciduous forest foliar and forest floor chemistry and basal area tree growth across a nitrogen (N) deposition gradient in the northeastern US

    Science.gov (United States)

    Johnny L. Boggs; Steven G. McNulty; Linda H. Pardo

    2007-01-01

    We evaluated foliar and forest floor chemistry across a gradient of N deposition in the Northeast at 11 red spruce (Picea rubens Sarg.) sites in 1987/1988 and foliar and forest floor chemistry and basal area growth at six paired spruce and deciduous sites in 1999. The six red spruce plots were a subset of the original 1987/1988 spruce sites. In 1999...

  17. Criterion 6, indicator 28 : total and per capita consumption of wood and wood products in round wood equivalents

    Science.gov (United States)

    James L. Howard; Rebecca Westby; Kenneth E. Skog

    2010-01-01

    Total consumption of wood and paper products and fuelwood, in roundwood equivalents, increased between 1965 and 1988 from 13.2 to 18.9 billion cubic feet. Since 1988, it has been about 20 billion cubic feet per year. Total per capita consumption increased between 1965 and 1987, from 68 to 83 ft3 per year. Since 1987 through 2006, per capita...

  18. National Dam Safety Program. Lakeview Estates Dam (MO 11004), Mississippi - Kaskaskia - St. Louis Basin, Warren County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1979-09-01

    ificatiozh Distributon/ Availabilit oe LAKEVIEW ESTATES DAM WARREN COUNTY, MISSOURI MISSOURI INVENTORY NO. 11004 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY...and *impounds less than 1,000 acre-feet of water . Our inspection and evaluation indicates that the spill- way of Lakeview Estates Dam does not meet...not be measured because of high reservoir level, scalloping near the crest and a berm just under the water surface. Limestone riprap in sizes from sand

  19. Seismic Fortification Analysis of the Guoduo Gravity Dam in Tibet, China

    Directory of Open Access Journals (Sweden)

    Peng Lin

    2015-01-01

    Full Text Available The primary aim of this research was to analyze the seismic performance of the Guoduo gravity dam. A nonlinear FEM method was implemented to study the deformation, stress, and overall stability of dam under both static and dynamic loading conditions, including both normal and overloading conditions. A dam seismic failure risk control method is proposed based on the cracking mechanism induced by the dynamic load to ensure dam safety and stability. Numerical simulation revealed that (1 under normal static and dynamic loading the symmetry of the displacement distributions is good, showing that the dam abutments and riverbed foundation have good overall stiffness. The stress distribution is a safe one for operation under both normal water loading and seismic loading. (2 Attention should be paid to the reinforcement design of outlets of the diversion dam monoliths, and enhance the capability of sustaining that tensile stress of dam monoliths. (3 The shape of the dam profile has a significant effect on the dynamic response of the dam. (4 By employing the “overload safety factor method,” the overall seismic fortification is as follows: K1=1.5, K2= 2~3, and K3= 3~4.

  20. In the Land of the Dammed: Assessing Governance in Resettlement of Ghana’s Bui Dam Project

    Directory of Open Access Journals (Sweden)

    Kwabena Asiama

    2017-11-01

    Full Text Available Resettlement resulting from dam construction has raised several concerns due to the negative aftermath impacts. In Ghana, the construction of three hydroelectric dams resulted in large-scale resettlements. Given the little experience that Ghana has in resettlements, it is necessary for a robust monitoring structure for resettlements. However, this was not available in the last resettlement undertaken for the Bui Dam Project. This paper aims at developing an assessment framework for monitoring resettlement activities on customary lands from a good governance perspective. Based on four good governance principles, transparency, public participation and inclusiveness, equity and rule of law and accountability, a good governance assessment framework is built and applied to the Bui Dam Project using a case study approach. Data were collected through interviews and focus group discussion with the key actors of the resettlement project. It was first found that the planning stage of the resettlement came out with a robust plan that was to prevent the impoverishment of the affected persons. However, in the implementation of the resettlement, not all good governance principles were adhered to. In conclusion, it was found that by deconstructing the resettlement process with a good governance framework, the problematic areas of the resettlement can be effectively differentiated between the planning and implementation phases.

  1. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  2. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Natural Resource Agency — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  3. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  4. The environmental impact of large dams

    International Nuclear Information System (INIS)

    Razvan, E.

    1992-01-01

    The campaigns of conservationist groups against dams are generally based on rather emotional issues. This paper puts the situation in a more rational perspective, by analysing the various claims which tend to be put forward concerning the impacts of large dams, examining the validity of the arguments, looking at ways in which any adverse effects can be mitigated, and presenting the complexity of the problems. (author)

  5. Discussion on the Safety Factors of Slopes Recommended for Small Dams

    Directory of Open Access Journals (Sweden)

    Jan Vrubel

    2017-01-01

    Full Text Available The design and assessment of the slope stability of small embankment dams is usually not carried out using slope stability calculations but rather by the comparison of proposed or existing dam slopes with those recommended by technical standards or guidelines. Practical experience shows that in many cases the slopes of small dams are steeper than those recommended. However, most of such steeper slopes at existing dams do not exhibit any visible signs of instability, defects or sliding. For the dam owner and also for dam stability engineers, the safety of the slope, expressed e.g. via a factor of safety, is crucial. The aim of this study is to evaluate the safety margin provided by recommended slopes. The factor of safety was evaluated for several dam shape and layout variants via the shear strength reduction method using PLAXIS software. The study covers various dam geometries, dam core and shoulder positions and parameter values of utilised soils. Three load cases were considered: one with a steady state seepage condition and two with different reservoir water level drawdown velocities – standard and critical. As numerous older small dams lack a drainage system, variants with and without a toe drain were assessed. Calculated factors of safety were compared with required values specified by national standards and guidelines.

  6. Annual report 1987

    International Nuclear Information System (INIS)

    1988-01-01

    In this annual report of the Dutch Interfacultary Reactor Institute, summary and detailed reports are presented of current research during 1987 of the departments radiochemistry, radiation chemistry, radiation physics and reactor physics. (H.W.). 61 refs.; 13 figs.; 14 tabs

  7. Owyhee River intracanyon lava flows: does the river give a dam?

    Science.gov (United States)

    Ely, Lisa L.; Brossy, Cooper C.; House, P. Kyle; Safran, Elizabeth B.; O'Connor, Jim E.; Champion, Duane E.; Fenton, Cassandra R.; Bondre, Ninad R.; Orem, Caitlin A.; Grant, Gordon E.; Henry, Christopher D.; Turrin, Brent D.

    2013-01-01

    Rivers carved into uplifted plateaus are commonly disrupted by discrete events from the surrounding landscape, such as lava flows or large mass movements. These disruptions are independent of slope, basin area, or channel discharge, and can dominate aspects of valley morphology and channel behavior for many kilometers. We document and assess the effects of one type of disruptive event, lava dams, on river valley morphology and incision rates at a variety of time scales, using examples from the Owyhee River in southeastern Oregon. Six sets of basaltic lava flows entered and dammed the river canyon during two periods in the late Cenozoic ca. 2 Ma–780 ka and 250–70 ka. The dams are strongly asymmetric, with steep, blunt escarpments facing up valley and long, low slopes down valley. None of the dams shows evidence of catastrophic failure; all blocked the river and diverted water over or around the dam crest. The net effect of the dams was therefore to inhibit rather than promote incision. Once incision resumed, most of the intracanyon flows were incised relatively rapidly and therefore did not exert a lasting impact on the river valley profile over time scales >106 yr. The net long-term incision rate from the time of the oldest documented lava dam, the Bogus Rim lava dam (≤1.7 Ma), to present was 0.18 mm/yr, but incision rates through or around individual lava dams were up to an order of magnitude greater. At least three lava dams (Bogus Rim, Saddle Butte, and West Crater) show evidence that incision initiated only after the impounded lakes filled completely with sediment and there was gravel transport across the dams. The most recent lava dam, formed by the West Crater lava flow around 70 ka, persisted for at least 25 k.y. before incision began, and the dam was largely removed within another 35 k.y. The time scale over which the lava dams inhibit incision is therefore directly affected by both the volume of lava forming the dam and the time required for sediment

  8. Some aspects in the legal regulation of the dams

    International Nuclear Information System (INIS)

    Tancev, Ljubomir

    1996-01-01

    In order to ensure high quality and low cost design and building of dams and appurtenant structures, as well as safe exploitation, it is obvious to have appropriate legislation. Keeping in mind that the dams are unique structures, for the design stage the legislation should be less strong. For the next phases - building, maintenance and exploitation - detail and rigorous legislation is recommended. It is emphasised that the engineers should have more freedom designing the dams, but they should be obvious to apply the most recent achievement in the field of the dam design and construction. For illustration, some aspects of three important questions are discussed - 1) the choice of maximum flood discharge, 2) the application of new materials and construction methods and 3) the application of modern methods for static and dynamic analysis of dams. (Author)

  9. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    OpenAIRE

    Liu, Hai-ming; Nan, Gan; Guo, Wei; Yang, Chun-he; Zhang, Chao

    2018-01-01

    The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach seg...

  10. Annual report on operation, utilization and technical development of research reactors and hot laboratory, from April 1, 1987 to March 31, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    Activities of the Department of Research Reactor Operation in fiscal year 1987 are described. The department is responsible for operation and maintenance of JRR-2, JRR-4, Research Reactor Development Division which performed upgraded JRR-3 and other R D, and Hot Laboratory. In the above connection various other work has also been performed, such as technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, we have performed post-irradiation examinations of fuels and materials, and also development of examination procedures, too. (author)

  11. 33 CFR 117.705 - Beaver Dam Creek.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  12. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages

    Energy Technology Data Exchange (ETDEWEB)

    Davard, J.

    1997-12-31

    The Dams bulletin reports on technical news concerning big French dams in operation. This issue comprises 5 papers. Two of them are examples of granting problems which led to the dismantling of the dams of Kernansquillec (Cotes d`Armor, France) and Maisons-Rouges (Indre-et-Loire, France) for economical and environmental reasons. The 3 other papers concern the life of French dams (technical control reports of the French dams in operation), the activities of the control service (annual inspections, preparation of draining operations, renewing of granting), and some general information (organisation of competent authorities, colloquium reports, hydro-power production during the first quarter of 1997). (J.S.)

  13. Habitat Evaluation Procedures Report; Graves Property - Yakama Nation.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul; Muse, Anthony

    2008-02-01

    A habitat evaluation procedures (HEP) analysis was conducted on the Graves property (140 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also documented the general ecological condition of the property. The Graves property was significantly damaged from past/present livestock grazing practices. Baseline HEP surveys generated 284.28 habitat units (HUs) or 2.03 HUs per acre. Of these, 275.50 HUs were associated with the shrubsteppe/grassland cover type while 8.78 HUs were tied to the riparian shrub cover type.

  14. Fosfortab fra det dyrkede areal til Stevning Dam, Hindemaj og Haderslev Dam

    DEFF Research Database (Denmark)

    Andersen, Hans Estrup; Heckrath, Goswin; Thodsen, Hans

    Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P-indeks-kortlægni......Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P...

  15. Annual report 1987 Materials Department

    International Nuclear Information System (INIS)

    1989-01-01

    Review of the activities performed by the Materials Department of the National Atomica Energy Commission of the Argentine Republic during the year 1987. The Department provides services and assistance in all matters related to metallography and special techniques, corrosion and materials' transport, transport phenomena, casting and solidification, damage by radiation, thermomechanical treatments, mechanical properties, fatigue and fracture, multinational project of research and development in materials, VII course on metallurgy and technology of materials. Likewise, information on the Materials Department's staff, its publications, projects and agreements, seminars, courses and conferences during 1987 is included [es

  16. Earth Sciences annual report, 1987

    International Nuclear Information System (INIS)

    Younker, L.W.; Donohue, M.L.; Peterson, S.J.

    1988-12-01

    The Earth Sciences Department at Lawrence Livermore National Laboratory conducts work in support of the Laboratory's energy, defense, and research programs. The Department is organized into ten groups. Five of these -- Nuclear Waste Management, Fossil Energy, Containment, Verification, and Research -- represent major programmatic activities within the Department. Five others -- Experimental Geophysics, Geomechanics, Geology/Geological Engineering, Geochemistry, and Seismology/Applied Geophysics -- are major disciplinary areas that support these and other laboratory programs. This report summarizes work carried out in 1987 by each group and contains a bibliography of their 1987 publications

  17. Dam-break studies for mine tailings impoundments

    International Nuclear Information System (INIS)

    Jeyapalan, J.K.

    1982-01-01

    This paper describes simple procedures for performing dam-break analyses. Tailings from dam failures usually liquefy and flow for substantial distances as a viscous fluid. The prediction of the possible extent of flow slide movement is illustrated using two case histories. Topics considered include the flow behavior of liquefied talings, dimensionsless numbers for mine tailings and associated flow regimes, laminar flow, and turbulent flow. The potential inundation regions downstream of mine tailings dams are assessed. It is concluded that instances of flow slides of mine waste embankments indicate that the failure of these structures has considerable potential for damage to life and property in many cases

  18. An Agricultural Expansion Strategy for Burundi

    Science.gov (United States)

    1991-04-04

    missions. Farmers were able to work continuous plots only in tl. cast of pineapple, strawberries, and pomegranates. However, fruit trees such as the guava ...110 tons Lemons 1,200 tons Pomelos 25 tons Avocados 12,000 tons Mangoes 5,200 tons Guavas 3,200 tons Beef heart 280 tons Medlars 320 tons Total 31,485...30,908 9 1987-1988 36,223 1,040 37,263 10 1988-1989 34,112 1,200 35,312 35 TABLE 3 PRODUCTION OF TEA 1987 1988 Production of Tea Leaves (tons) 20,562

  19. PHOTOELECTRIC OBSERVATIONS OF HD 8358

    Directory of Open Access Journals (Sweden)

    Woo-Baik Lee

    1989-06-01

    Full Text Available UBV photoelectric observations of RS CVn type variable star HD 8358 were made using the 61cm reflector at Sobaeksan Astronomical Observatory. The data were obtained on 15 nights from October 1987 to December 1988. Double peaks of maximum light is seen from the light curve and continuous change of phase in notified from the times of maximum lights. The colors of October, 1987 - January, 1988 observations are bluer in ∆(b-u, but redder in ∆(u-b, than those of November -December, 1988 observations.

  20. Radioactivity in foodstuffs 1987

    International Nuclear Information System (INIS)

    1988-01-01

    The dose of radioactivity to which the average Norwegian consumer was exposed through the consumption of food during the year immediately following the Chernobyl accident was 0.15 mSv. Certain individuals with special dietary habits (large proportions of freswater fish and reindeer meat), and who live in regions particularly affected by radionuclide contamination, have been exposed to higher doses (0.4 to 1.8 mSv). These doses would have been considerably higher had not dietary advise been followed. Even though health risk assessments suggested in the spring of 1987 that it was reasonable to revoke the action levels then in force, they were nevertheless maintained after political consideration of the situation. Measures implemented in 1987 have resulted in a certain reduction of the dose to which the population has been exposed, and the associated costs have also fallen considerably in relation to the situation in 1986. The present report summarizes analytical results of monitoring and surveillance activities in 1987 and describes the measures introduced with regard to the various categories of food. Measures have been introduced primarily in connection with sheep meat production and reindeer farming, even if certain measures have been necessary also with regard to goat milk and cheese manufacture

  1. Dams and river dolphins: Can they co-exist?

    International Nuclear Information System (INIS)

    Reeves, R.R.; Leatherwood, S.

    1994-01-01

    Dam construction is one of many ways that humans have modified river-dolphin habitats. It is suggested that physiographic and hydrologic complexity plays an important role in making rivers suitable for dolphins. If this hypothesis is true, then it can be assumed that dams and other artificial obstructions degrade dolphin habitat insofar as they reduce such complexity. This paper identifies some of the impacts that dams, barrages, and dikes might have on dolphins. Research is needed at project sites, both before and after construction, to document impacts. Specially designed ''swimways'' may allow upstream and downstream passage by dolphins and thus mitigate at least one of the adverse effects of dam projects, namely population fragmentation, but such measures aimed at benefiting single species are no substitute for protecting ecosystems. 30 refs

  2. The effect of low dose gamma irradiation on maize production (1985-1988)

    International Nuclear Information System (INIS)

    Al-Oudat, M.; Khalifa, K.

    1990-06-01

    Presowing seed irradiation has been reported as a useful application of radiation in agriculture to stimulate growth and increase the yield of certain field crops. To the best of our knowledge the feasibility of this treatment has not yet been tested on maize in Syria. Our experiments were carried out in controlled, in field conditions, and in a large scale application. Samples of air dried seeds of maize (Var. Gota-82 and LG-11) of previous season were irradiated by gamma-rays from a 137 Cs sourse using doses of 5, 7.5, 10, 15, 20, 30, 40 and 50 Gy. at dose rate of 9.8 - 9.2 Gy/min. Then were planted after 2 days from irradiation with unirradiated control, in complete randomized block design and replicated 4 times for four seasons (1985-1988). The date revealed that gamma irradiation, at interval doses of 5 - 10 Gy led to, first: Acceleration of seed germination, faster development, intensive development of root system, increase plant hieght (12 - 19%) and significant increase in ear size and number, and second: Increase both green mass (15 - 35%) and seed yield (10 - 31%), and percentage of seed protein (2 - 17%). Large scale applications were performed in 1987 and 1988 using a transportable irradiation unit POC-1 137 Cs and dose of 7.5 Gy. A significant yield increase was obtained from all fields. The average percentage increment varied from 13 - 30% which is approximately 382-765 Kg/h. Therefore, presowing seed irradiation with low doses gamma irradiation ranging from 5 to 10 Gy, was found to be feasible for application in qualitative and quantitative improvement of maize yield. (author). 38 refs., 12 figs., 44 tabs

  3. Clinical Investigation Program Fiscal Year 1987.

    Science.gov (United States)

    1987-10-01

    Cervical Dysphagia : Criteria for Patient Selection. Gary P. Wratten Surg Symposium, El Paso, TX, Apr 1987 Kreder KJ: A Massive Testicular Tumor in a...Academy of Otolaryngology-Head and Neck Surgery Ann Meeting, Chicago, IL, Sep 1987 Parkinson DW, Reinker KA: Slipped Capital Femoral Epiphysis and Renal...Osteodystrophy: A Case Report with Five Years Follow-Up, 28th Ann Society of Military Orthopaedic Surgeons, Colorado Springs, CO, Nov 1986 Parkinson

  4. Dynamic probability evaluation of safety levels of earth-rockfill dams using Bayesian approach

    Directory of Open Access Journals (Sweden)

    Zi-wu Fan

    2009-06-01

    Full Text Available In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined with the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.

  5. Mechanism Research of Arch Dam Abutment Forces during Overload

    Directory of Open Access Journals (Sweden)

    Yu Xia

    2015-01-01

    Full Text Available This paper presents research on the abutment forces of a double-curvature arch dam during overload based on numerical calculation results obtained through finite element method by Ansys. Results show that, with an increase in elevation, the abutment forces and bending moment of the arch dam increase first and then decrease from the bottom to the top of the dam. Abutment forces and bending moment reach their maximum at the middle or middle-down portion of the dam. The distributions of abutment forces and moment do not change during overload. The magnitude of each arch layer’s forces and moment increases linearly during overload. This result indicates that each arch layer transmits bearing loads to the rocks of the left and right banks steadily. This research explains the operating mechanism of an arch dam under normal and overload conditions. It provides a simple method to calculate the distribution of forces Fx and Fy and a new method to calculate the overload factor of an arch dam through the estimation of arch layers based on the redistribution characteristic of arch abutment forces.

  6. Determining The Water Quality of Maruf Dam (Boyabat–Sinop

    Directory of Open Access Journals (Sweden)

    Ekrem MUTLU

    2017-06-01

    Full Text Available In this study, the preliminary findings obtained from 3 sampling points, which represent the whole, on Maruf Irrigation Dam, which is located in Boyabat district of Sinop province, for 12 months between September 2015 and August 2016 were examined. The parameters monitored are temperature, dissolved oxygen, pH, electrical conductivity, total hardness, total alkalinity, chemical oxygen demand, biological oxygen demand, and dissolved anions and cations (sodium, potassium, calcium, magnesium, ammonium, nitrate, phosphate, chloride, sulfate, and sulfite. Because of its low dissolved ionic matter content, Maruf Dam was characterized as an alkali dam with mid-hard water and low electrical conductivity. In terms of parameters A and B of Surface Water Quality Management Regulation, the dam is considered “high-quality” and “unpolluted”. Besides the irrigation purposes, for which the barrage was constructed, the dam can also be used for aquaculture, animal breeding, and farming needs.

  7. Establishment of alien registration requirements, 7 January 1988.

    Science.gov (United States)

    1988-01-01

    On 7 January 1988, the Immigration Commissioner of the Philippines announced that all temporary or permanent aliens resident in the Philippines were required to register with the Commission on Immigration and Deportation in order to legalize their stay in the country. Those who failed to register by a March deadline were subject to immediate deportation. The Commission also set a P500,000 reward for those giving information on the whereabouts of overstaying or undesirable aliens. Effective 21 November 1988, President Corazon Aquino ordered the alien legalization program to be suspended. See Manila Radio Veritas, 18 November 1988; Foreign Broadcast Information Service, FBIS-EAS-88-224, 21 November 1988, p. 41. full text

  8. MNR's role in public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, Jennifer [Ministry of Natural Resources, Peterborough, ON (Canada)

    2011-07-01

    The Ministry of Natural Resources (MNR) is the largest dam owner in Ontario with around 400 dams located all across the province. MNR works to exercise stewardship of Ontario's water resources in a context of public safety, employee safety and environmental awarenes. This presentation shows the different measures MNR implemented to reduce risks. Warning signs, safety booms, barrel buoys and pedestrian fencing have been installed around dams to alert the public to possible dangers. In addition, MNR employees receive training in how to inspect dams for safety concerns, how to identify problems which could result in hazards to the public and how to work safely.

  9. Detection of Water Leaks in Beni-Haroun Dam (Algeria)

    International Nuclear Information System (INIS)

    Hocini, N.; Mami, M.

    2011-01-01

    The main objective of this work was to detect water leakage origin combining conventional, tracing and isotope techniques. The investigation was performed by a research team from the 'Algiers Nuclear Research Centre' in collaboration with engineers from the 'National Agency for Dams'. The chemical and isotopic results have shown no influence of dam water on the water sampled at the piezometers and drains that are present in the close neighbourhood of the dam. However, the water flowing at drain D15 has exhibited the nearest quality to that dam. Dye tracing has shown a water circulation through complex pathways for the left bank. (author)

  10. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  11. User's Guide: Arch Dam Stress Analysis System (ADSAS)

    National Research Council Canada - National Science Library

    1997-01-01

    .... ADSAS assumes linear elastic behavior for the entire dam, i.e. the dam is assumed to support the computed tensile stresses within the concrete mass and across the monolith joints without cracking or opening the joints...

  12. Radioactivity of people in Finland in 1987

    International Nuclear Information System (INIS)

    Rahola, T.; Suomela, M.; Illukka, E.; Pusa, S.

    1989-08-01

    The atmospheric nuclear bomb tests in the 1950s, '60s and '70s caused global radioactive fallout. After the reactor accident at Chernobyl on April 26, 1986, radioactive fallout was carried by by air streams to most parts of Europe. In 1987 radionuclides causing internal contamination were transported to man only via different foodchains and no longer via inhalation, as had happened immediately after the Chernobyl accident. To determine the level of radionuclides in the body and to estimate the internal radiation doses caused by the Chernobyl accident, whole-body counting measurements were performed. Ten different groups of people were measured during 1987. Three were local reference groups, two groups of radiation workers, one a population group representing the whole country and four groups representing those with special dietary habits. The weighted mean 137 Cs body burden in the population group was 2000 Bq at the end of 1987, the minimum body burden being 200 Bq and the maximum 10000 Bq. The measurement results showed that the maximum body burdens were reached in the summer 1987. The groups with special diets did not necessarily follow this pattern. The mean effective dose equivalents delivered in 1987 to people in Finland, estimated by using the measurement results of the population group, was 0.08 mSv, the corresponding dose equivalent in 1986 bein 0.06 mSv

  13. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    Chinook salmon and 2.4-fold for hatchery steelhead as discharge increased between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River and Salmon River traps were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993 and the installation of the Removable Spillway Weir at Lower Granite Dam in 2001, caution must be used in comparing cumulative interrogation data. Cumulative interrogations at the four dams for fish marked at the Snake River trap were 65% for hatchery Chinook, 72% for wild Chinook, 66% for hatchery steelhead, and 67% for wild steelhead. Cumulative interrogations at the four dams for fish marked at the Salmon River trap were 48% for hatchery Chinook, 61% for wild Chinook salmon, 57% for hatchery steelhead trout, and 56% for wild steelhead trout.

  14. Dams. Bulletin of the Technical Service of Electric Power and Big Dams; Barrages. Bulletin du Service Technique de l`Energie Electrique et des Grands Barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Four papers were selected in this issue of the bulletin of the Technical Service of Electric Power and Big Dams. The first one concerns the `Catastrophe Medicine` congress which took place in Amiens (France) in December 5 to 7 1996 and during which the analysis of experience feedbacks and lessons gained after dam accidents and organisation of emergency plans was discussed. The second one is a report of the conclusions of the decennial and annual inspections of French dams. The third paper describes the reinforcement of the Lavaud-Gelade dam embankment and the last paper reports on the Control Services activities concerning the French dams in operation for the forth quarter of the year 1996. (J.S.)

  15. Risk Perception Analysis Related To Existing Dams In Italy

    Science.gov (United States)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned

  16. Dam safety review using non-destructive methods for reinforced concrete structure

    Energy Technology Data Exchange (ETDEWEB)

    Philibert, Alain; Saint-Pierre, Francois; Turcotte, Bernard [Le Groupe S.M. International Inc., Sherbrooke, (Canada)

    2010-07-01

    Dams built at the beginning of the twentieth century include concrete structures that were put in under rehabilitation works. In some cases, the details of the structures are not well documented. In other cases, concrete damage can be hidden under new layers of undamaged material. This requires that the dam safety review in a real investigation gather the information necessary for carrying out the hydraulic and stability studies required by the Dam Safety Act. This paper presented the process of dam safety review using non-destructive methods for reinforced concrete structures. Two reinforced concrete dams built in the 1900's, the Eustic dam on the Coaticook River and the Frontenac dam on the Magog River near Sherbrooke, were evaluated by S.M. International using non-destructive methods such as sonic and ground penetrating radar methods. The studies allowed mapping of concrete damage and provided geometric information on some non visible structure elements that were part of previous reinforcement operations.

  17. How to manage the cumulative flood safety of catchment dams ...

    African Journals Online (AJOL)

    Dam safety is a significant issue being taken seriously worldwide. However, in Australia, although much attention is being devoted to the medium- to large-scale dams, minimal attention is being paid to the serious potential problems associated with smaller dams, particularly the potential cumulative safety threats they pose ...

  18. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  19. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  20. Summary of George Mason University SN1987A workshop

    International Nuclear Information System (INIS)

    van den Bergh, S.

    1990-01-01

    The author summaries studies of SN 1987A. This discussion focuses on how theories of core collapse in supernovae have been confirmed by observations of neutrinos produced by SN1987A and observations of the exponential tail of the light curve of SN1987A give strong support to the prediction that this phase of supernova light curves is powered by 56 Co decay