WorldWideScience

Sample records for mcgriff edison project

  1. Prediction and optimization methods for electric vehicle charging schedules in the EDISON project

    DEFF Research Database (Denmark)

    Aabrandt, Andreas; Andersen, Peter Bach; Pedersen, Anders Bro

    2012-01-01

    project has been launched to investigate various areas relevant to electric vehicle integration. As part of EDISON an electric vehicle aggregator has been developed to demonstrate smart charging of electric vehicles. The emphasis of this paper is the mathematical methods on which the EDISON aggregator...

  2. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  3. Southern California Edison High Penetration Photovoltaic Project - Year 1

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B.; Kroposki, B.; Neal, R.; Katiraei, F.; Yazdani, A.; Aguero, J. R.; Hoff, T. E.; Norris, B. L.; Parkins, A.; Seguin, R.; Schauder, C.

    2011-06-01

    This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigating high-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirable distribution system impacts caused by high-penetration PV installations.

  4. The Edison Environmental Center Permeable Pavement Site - slides

    Science.gov (United States)

    This is a presentation for a second Community Outreach Event called "Chemistry Works!" at West Windsor Public Library on Saturday, November 5th. It will review the permeable pavement research project at the Edison Environmental center. Besides slide persentation, two demo units w...

  5. Company profile: Edison of Italy

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The energy subsidiary of the Montedison chemicals company (Ferruzzi Group), Edison is Italy's largest private sector electricity producer. Last year production amounted to 4.7 TWh, an increase of 8.2% on 1990, and at the end of June this year, total net production of 2.4 TWh was 14.8% higher than in the first half of 1991. Edison also ranks first in the Italian league of private sector hydrocarbons producers, its Edison Gas subsidiary controlling a group that has significant exploration and development interests. These are mainly in Italy where production amounted to 333m cubic metres of natural gas and 690,000 barrels of oil in the first half of the year. The recent acquisition of Deutsche Shell's Italian fields should allow Edison to reach 2bn cubic metres of gas production by 1996. (author)

  6. PREFACE: Edison 16

    Science.gov (United States)

    Varani, Luca; Palermo, Christophe; Bastard, Gérald

    2009-11-01

    Conference logo On behalf of the organizing committee we welcome all participants to the 16th International Conference on Electron Dynamics In Semiconductors, Optoelectronics and Nanostructures (EDISON). Since the first meeting, organized in 1973 in Modena (Italy), this international conference has been regularly organized mostly each two years, and after 28 years EDISON is back to Montpellier for its 16th edition. This conference was previously known as 'Hot Carriers In Semiconductors' (HCIS). For some years the name was changed into 'Nonequilibrium Carrier Dynamics in Semiconductors' (keeping the acronym HCIS). Then, during the last meeting of the international advisory committee in Tokyo, the decision was taken to find a new denomination that should be more adapted to the latest evolutions in the domains covered by the conference. After several discussions and a vote within the committee, the new acronym of EDISON was chosen. Therefore EDISON 16 can be considered as the last of a long series of conferences and, at the same time, the first of a new cycle of conferences. The primary focus of EDISON is to provide an international meeting place to discuss the latest progress in the field of nonequilibrium classical and quantum carrier dynamics, from semiconductor bulk materials up to advanced structures and nanometric devices. This includes: classical incoherent transport, as well as coherent transport, usually analyzed by means of ultrafast electrical and optical excitations. To accompany the newest developments, TeraHertz phenomena, with a special attention to quantum cascade lasers, have been added to the list of topics. More recently new subjects have been included such as spintronics, transport in organic materials, graphene and carbon nanotubes. This list of topics is regularly modified and updated at each edition of the conference to represent but also anticipate the latest scientific evolutions. The distinctive features of EDISON are: A long-lasting history

  7. Practicing like Thomas Edison.

    Science.gov (United States)

    Baum, Neil; Ornstein, Hal

    2013-01-01

    For many centuries, medicine has practiced in a vacuum, and the healthcare profession has been isolated from other scientific disciplines. Beginning in the 20th century, doctors and scientists have looked to others for ideas, suggestions, innovations, and new technologies. Probably no one in the past hundred years has done so much to change the world than Thomas Edison. This article will discuss eight principles of Edison and how they may apply to our profession and our practices.

  8. The light bulb, cystoscopy, and Thomas Alva Edison.

    Science.gov (United States)

    Moran, Michael E

    2010-09-01

    Thomas Alva Edison was an icon of American achievement who literally invented the 20th century. Although best known as the inventor of the electric light bulb, the phonograph, and motion pictures, he also left a lasting legacy via peripheral developmental applications, such as endoscopes. A review of published urologic writings about incandescent cystoscopes was cross-referenced to writings about or from Edison. Important events that allowed transference of technology from the Edison laboratory to clinical practice were emphasized. Edison was born in 1847 while Lincoln was serving in Congress; he died in 1931 when Hoover struggled with the Great Depression. Edison's life spanned the formative period of America that Henry Adams called the "coming of age." Edison received a Sprengel vacuum device in late 1879, and as usual, he was able to tweak the machine to better performance. For 5 days in October, 16 to 21, he improved the vacuum from 1/100,000 to 1/1,000,000 atm, and his first incandescent bulb burned softly. On December 21, 1879, he leaked the story to N.Y. Herald journalist Marshall Fox, and the world was notified of the light bulb. Special Christmas light visits started in Menlo Park just 4 days later. Edison patented the screw cap for easy changes, and the first bulbs sold for 40 cents (cost $1.40). 100,000 bulbs sold in 1882, 4 million by 1892, and 45 million in 1903. Immediately, competitors and specialty manufacturers entered the market. Dr. Henry Koch and Charles Preston in Rochester, N.Y., developed a smaller, low amperage bulb that could be fitted to medical devices. No discussion of electricity and modern applications would be complete without some discussion of Thomas Alva Edison and his sentinel contributions. The first church, post office, and ship were illuminated in 1892. The first hotel, theater, and electric sign were in 1893. The rapidity of dispersal and secondary applications of Edison's inventions is typified by the rise of cystoscopes

  9. EDISON – Study on optimal grid integration of electric vehicles

    DEFF Research Database (Denmark)

    Foosnæs, Anders Holm; Andersen, Claus Amtrup; Christensen, Linda

    2011-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both individual car owners, and society as a whole through reductions in CO2 emissions. The consortium partners...

  10. New Jersey's Thomas Edison and the fluoroscope.

    Science.gov (United States)

    Tselos, G D

    1995-11-01

    Thomas Edison played a major role in the development of early x-ray technology in 1896, notably increasing tube power and reliability and making the fluoroscope a practical instrument. Eventually, Edison would move x-ray technology from the laboratory to the marketplace.

  11. A Model Technology Educator: Thomas A. Edison

    Science.gov (United States)

    Pretzer, William S.; Rogers, George E.; Bush, Jeffery

    2007-01-01

    Reflecting back over a century ago to the small village of Menlo Park, New Jersey provides insight into a remarkable visionary and an exceptional role model for today's problem-solving and design-focused technology educator: Thomas A. Edison, inventor, innovator, and model technology educator. Since Edison could not simply apply existing knowledge…

  12. Thomas Alva Edison

    Indian Academy of Sciences (India)

    lived thousand years in a single night," he often used to say. Edison's creativity, courage ... sense of discerning what would be useful to people were perhaps his main attributes. .... 21, 1879. The first successful incandescent electric light of the.

  13. What would Edison do with solid state lighting?

    Science.gov (United States)

    Ferguson, Ian T.; Melton, Andrew; Xu, Tianming; Jamil, Muhammad; Fenwick, Will

    2010-08-01

    Thomas Edison is widely regarded as the greatest inventor in history and the most prominent individual behind the invention of the electric light. His impressive characteristics as an individual that led to his amazing success as an innovator continue to be an inspiration for researchers today. This paper considers how Edison might proceed in developing solid state lighting into a technology capable of displacing incumbent light sources, including his own incandescent lamps, then reviews some of the "Edison-like" contributions made to solid state lighting by the Next Generation Lighting research program at Georgia Tech.

  14. Thomas Alva Edison (170th Anniversary of His Birth

    Directory of Open Access Journals (Sweden)

    V. P. Samokhin

    2017-01-01

    Full Text Available A brief overview of the major technical achievements of Thomas Edison, an outstanding American inventor, author of more than 1,000 US patents and several thousand patents in other countries, honorary academician of the USSR. Presents biographical information and details of the formation of Edison, his work as a telegrapher, organizing the world's first industrial research laboratory for the continuous development of technological innovations, as well as some interesting facts about his life and work. This includes pioneering work on the creation of Edison incandescent lighting, the distribution system for their power and cinema. Edison can be considered the founder of the multimedia technology, as it was the beginning of the invention of the phonograph of phonics and disc phonograph recording of depth was the basis of mechanical recording. Name Edison are geographic features, a lot of companies and educational institutions. He was a member of many Academies of Sciences and entered the list of "100 most outstanding people for 1,000 years." Bust open in the Hall of Fame of great Americans, and a bronze statue - sculptures at the National Hall on Capitol Hill.

  15. Edison Is the Symptom, NCLB Is the Disease

    Science.gov (United States)

    Campbell, Peter

    2007-01-01

    Engaging students requires giving them a say in what they learn and how they will learn it. However, in strictly disciplined, rule-bound schools with test-driven curricula, this cannot happen. Edison Schools, Inc., a for-profit Education Management Organization (EMO), and Confluence Academy, an Edison-run school located in one of the most…

  16. Happy Birthday, Thomas Edison!

    Science.gov (United States)

    Dalton, Edward A.

    1997-01-01

    Discusses the work and inventions of Thomas Edison and their use in making teachers and students aware of the importance of electrotechnology in their lives and in their futures. Enables students to learn about science, experimentation, research, the process of invention, and the thrill of discovery. Describes educational resources available from…

  17. Edison Demonstration of Smallsat Networks (EDSN)

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Edison Demonstration of SmallSat Networks (EDSN) mission will launch and deploy a group of eight cubesats into a loose formation approximately 250 miles (400...

  18. Thomas Alva Edison (170th Anniversary of His Birth)

    OpenAIRE

    V. P. Samokhin; E A. Tikhomirovа

    2017-01-01

    A brief overview of the major technical achievements of Thomas Edison, an outstanding American inventor, author of more than 1,000 US patents and several thousand patents in other countries, honorary academician of the USSR. Presents biographical information and details of the formation of Edison, his work as a telegrapher, organizing the world's first industrial research laboratory for the continuous development of technological innovations, as well as some interesting facts about his life a...

  19. Commonwealth Edison operating experience: the people factor

    International Nuclear Information System (INIS)

    Soth, L.

    1983-01-01

    Since 1955, Commonwealth Edison's nuclear commitment has evolved into three operating stations, another in startup, and two more under construction. Paralleling this evolution has been the investment in the personnel resources to operate, maintain, and manage these facilities. The personnel resource, its training and development, is the foundation for safe operation at any nuclear plant - the people factor. The personnel requirement at Edison has expanded and evolved with each station to meet ever increasing regulatory requirements. An extensive training organization has been developed to emphasize the importance of the man side of the human factors man/machine interface. Personnel errors are investigated to identify and correct the root causes, and outstanding personnel performance is recognized by the Company

  20. Permeable Pavement Research - Edison, New Jersey

    Science.gov (United States)

    This presentation provides the background and summary of results collected at the permeable pavement parking lot monitored at the EPA facility in Edison, NJ. This parking lot is surfaced with permeable interlocking concrete pavers (PICP), pervious concrete, and porous asphalt. ...

  1. Thomas Edison's Inventions in the 1900s and Today: From "New" to You! [Lesson Plan].

    Science.gov (United States)

    2002

    The purpose of this lesson is to familiarize students with life and technology around 1900 so that they can better understand how Thomas Edison and his many inventions influenced both. Without some understanding of Edison's time, it is unclear just how significant an impact Edison had on the world, both then and now. While the incandescent light…

  2. 76 FR 42725 - Notice of Availability of the Record of Decision for the Southern California Edison Company...

    Science.gov (United States)

    2011-07-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-17905, LLCAD06000 L51010000 ER0000 LVRWB09B1820] Notice of Availability of the Record of Decision for the Southern California Edison Company Devers-Palo Verde No. 2 Transmission Line Project, California AGENCY: Bureau of Land Management, Interior...

  3. Consolidated Edison Company of New York, Inc

    International Nuclear Information System (INIS)

    Raebiger, R.F.; King, R.D.; Friess, R.A.

    1992-01-01

    This paper reports that in 1989 Consolidated Edison Company of New York which initiated a comprehensive tank cleaning and inspection program of their petroleum distillate storage facilities. The program was initiated by the issuance of new regulations of the New York State Department of Environmental Conservation. A total of 10 storage tanks were cleaned, inspected and detailed engineering reports prepared for each storage tank. A total of 28 distillate storage facilities will be inspected over a three year period of time. The tanks ranged in size from 18,000 to 2,701,00 gallons and contained either No. 2 Fuel Oil or Kerosene. The project included waste disposal, tank cleaning, inspection, engineering evaluations and the design of tank repairs. Of the 10 tanks inspected, three of the tanks required extensive repairs including the design and installation of a new bottom shell course and partial floor replacement for one of the tanks. The project was completed on schedule and within the budget allocated. The ten tank project was evaluated upon its completion and recommendations regarding tank operations and maintenance were provided to minimize maintenance problems for the future

  4. Commonwealth Edison captures intruders on screen

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Commonwealth Edison has developed three software programs, with the supporting hardware, that significantly upgrade security monitoring capabilities at nuclear power stations. These are Video Capture, the Alternate Perimeter Alarm Reporting System, and the Redundant Access Control System. Conventional video systems only display what is happening at the moment and rewinding a VCR to discover what occurred earlier takes time. With Video Capture the images can be instantly restored to the monitor screen and printed out. When one of the security devices used to monitor the perimeter of a Commonwealth Edison nuclear power station is tripped, the Video Capture program stores the visual image digitally. This is done using similar technology to the employed in fax machines. The security staff are thus able to distinguish immediately between disturbances taking place simultaneously at different security zones. They can magnify and compare the stored images and print them out. The Alternate Perimeter Alarm Reporting System was developed to speed the transmission of alarm signals from the security sensors to the security computer. The Redundant Access Control System (RACS) was originally developed to meet the requirement of the Nuclear Regulatory Commission (NRC) for a secondary computer-operated security measure to monitor employee access to a nuclear power station. When employee drug testing became an additional NRC requirement, the Nuclear Division of Commonwealth Edison asked their programmers to modify RACS to generate a random list of personnel to be tested for substance abuse. RACS was then further modified to produce numerous station operating reports that had been previously compiled manually. (author)

  5. Microorganism Removal in Permeable Pavement Parking Lots in Edison Environmental Center, New Jersey

    Science.gov (United States)

    Three types of permeable pavements (pervious concrete, permeable interlocking concrete pavers, and porous asphalt) were monitored at the Edison Environmental Center in Edison, New Jersey for indicator organisms such as fecal coliform, enterococci, and E. coli. Results showed tha...

  6. Edison Home Community Study Unit.

    Science.gov (United States)

    Lee County School District, Ft. Myers, FL. Dept. of Environmental Education and Instructional Development Services.

    History is not merely events that occurred in the past. The past has influenced the present, as the present will influence the future. The purpose of this community study unit is to provide fourth grade students with an opportunity to investigate some of the history of Lee County, Florida. The unit's focus is on Thomas Edison, who built a home in…

  7. Con Edison power failure of July 13 and 14, 1977. Final staff report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    On July 13, 1977 the entire electric load of the Con Edison system was lost, plunging New York City and Westchester County into darkness. The collapse resulted from a combination of natural events, equipment malfunctions, questionable system-design features, and operating errors. An attempt is made in this report to answer the following: what were the specific causes of the failure; if equipment malfunctions and operator errors contributed, could they have been prevented; to what extent was Con Edison prepared to handle such an emergency; and did Con Edison plan prudently reserve generation, for reserve transmission capability, for automatic equipment to protect its system, and for proper operator response to a critical situation. Following the introductory and summary section, additional sections include: the Consolidated Edison system; prevention of bulk power-supply interruptions; the sequence of failure and restoration; analysis of the July 1977 power failure; restoration sequence and equipment damage assessment; and other investigations of the blackout. (MCW)

  8. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    International Nuclear Information System (INIS)

    Kelley, Nathan; Corsaro, Pietro

    2004-01-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects

  9. ALARA Council: Sharing our resources and experiences to reduce doses at Commonwealth Edison Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rescek, F. [Commonwealth Edison Co., Downers Grove, IL (United States)

    1995-03-01

    Commonwealth Edison Company is an investor-owned utility company supplying electricity to over three million customers (eight million people) in Chicago and northern Illinois, USA. The company operates 16 generating stations which have the capacity to produce 22,522 megawatts of electricity. Six of these generating stations, containing 12 nuclear units, supply 51% of this capacity. The 12 nuclear units are comprised of four General Electric boiling water (BWR-3) reactors, two General Electric BWR-5 reactors, and six Westinghouse four-loop pressurized water reactors (PWR). In August 1993, Commonwealth Edison created an ALARA Council with the responsibility to provide leadership and guidance that results in an effective ALARA Culture within the Nuclear Operations Division. Unlike its predecessor, the Corporate ALARA Committee, the ALARA Council is designed to bring together senior managers from the six nuclear stations and corporate to create a collaborative effort to reduce occupational doses at Commonwealth Edison`s stations.

  10. Organism Detection in Permeable Pavement Parking Lot Infiltrates at the Edison Environmental Center, New Jersey

    Science.gov (United States)

    Three types of permeable pavements were monitored at the Edison Environmental Center in Edison, New Jersey for indicator organisms such as fecal coliform, enterococci, and E. coli. Results showed that porous asphalt had much lower concentration in monitored infiltrate compared t...

  11. 75 FR 66795 - Enesco, LLC, Gund Division, Distribution Center, Edison, NJ; Notice of Affirmative Determination...

    Science.gov (United States)

    2010-10-29

    ... Division, Distribution Center, Edison, NJ; Notice of Affirmative Determination Regarding Application for..., Distribution Center, Edison, New Jersey (subject firm). The determination was issued on August 27, 2010. The...). The workers are engaged in activities related to the supply of packaging and distribution services...

  12. DC Grids for Smart LED-Based Lighting: The EDISON Solution

    Directory of Open Access Journals (Sweden)

    Steffen Thielemans

    2017-09-01

    Full Text Available This paper highlights the benefits and possible drawbacks of a DC-based lighting infrastructure for powering Light Emitting Diode (LED-lamps. It also evaluates the efforts needed for integrating the so called smart lighting and other sensor/actuator based control systems, and compares existing and emerging solutions. It reviews and discusses published work in this field with special focus on the intelligent DC-based infrastructure named EDISON that is primarily dedicated to lighting, but is applicable to building automation in general. The EDISON “PowerLAN” consists of a DC-based infrastructure that offers telecommunication abilities and can be applied to lighting retrofitting scenarios for buildings. Its infrastructure allows simple and efficient powering of DC-oriented devices like LED lamps, sensors and microcontrollers, while offering a wired communication channel. This paper motivates the design choices for organizing DC lighting grids and their associated communication possibilities. It also shows how the EDISON based smart lighting solution is evolving today to include new communication technologies and to further integrate other parts of building management solutions through the OneM2M (Machine to Machine service bus.

  13. 76 FR 30739 - Notice of Availability of the Record of Decision for Southern California Edison's Eldorado...

    Science.gov (United States)

    2011-05-26

    ... LLCAD09000] Notice of Availability of the Record of Decision for Southern California Edison's Eldorado... INFORMATION: Southern California Edison (SCE) filed an application under Title V of the Federal Land Policy...) for further requirements. Authority: 40 CFR 1506.6. Thomas Pogacnik, Deputy State Director. [FR Doc...

  14. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman [Consolidated Edison Company Of New York, Inc., NY (United States)

    2014-12-28

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  15. CERN's LHC is awarded the 2012 EPS Edison Volta Prize

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    The European Physical Society (EPS), the Centro di Cultura Scientifica “Alessandro Volta” and Edison S.p.A. have awarded the 2012 EPS Edison Volta Prize for outstanding contributions to physics to three CERN physicists.   The award was given to: • Rolf-Dieter Heuer, CERN Director-General, • Sergio Bertolucci, CERN Director for Research and Computing, • Stephen Myers, CERN Director for Accelerators and Technology, for having led - building on decades of dedicated work by their predecessors - the culminating efforts in the direction, research and operation of the CERN Large Hadron Collider (LHC), which resulted in many significant advances in high energy particle physics, in particular, the first evidence of a Higgs-like boson in July 2012. To learn more, check out e-EPS News.

  16. Electrical Connections: Letters to Thomas Edison in Response to His Claim of Solving Incandescent Lighting, 1878.

    Science.gov (United States)

    Bazerman, Charles

    1994-01-01

    Discusses the way in which letters sent to Thomas Edison following the report that he had solved the problem of incandescent lighting reveal the many discursive worlds that Edison's work touched. Claims these letters indicate how a technological accomplishment is also a multiple, complex social, and communicative accomplishment, creating place and…

  17. Metal concentrations from permeable pavement parking lot in Edison, NJ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements...

  18. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M. [ed.] [VTT Energy, Espoo (Finland). Energy Systems

    1996-12-31

    The report comprises a summary of the results of the first three years of the research programme EDISON on distribution automation in Finnish electrical utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of funding is from the Technology Development Centre (Tekes) and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of thirteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1996. (orig.)

  19. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M. [ed.] [VTT Energy, Espoo (Finland). Energy Systems

    1997-12-31

    The report comprises a summary of the results of the first four years of the research programme EDISON on distribution automation in Finnish utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of the funding is from the Technology Development Centre TEKES and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer associated automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of fifteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1997. (orig.) 43 refs.

  20. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M [ed.; VTT Energy, Espoo (Finland). Energy Systems

    1997-12-31

    The report comprises a summary of the results of the first three years of the research programme EDISON on distribution automation in Finnish electrical utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of funding is from the Technology Development Centre (Tekes) and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of thirteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1996. (orig.)

  1. Update to Permeable Pavement Research at the Edison Environmental Center - abstract

    Science.gov (United States)

    Abstract The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable pavers...

  2. Update to permeable pavement research at the Edison Environmental Center - slides

    Science.gov (United States)

    Abstract: The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavement including: interlocking concrete permeable paver...

  3. Analysis of a homemade Edison tinfoil phonograph.

    Science.gov (United States)

    Sagers, Jason D; McNeese, Andrew R; Lenhart, Richard D; Wilson, Preston S

    2012-10-01

    Thomas Edison's phonograph was a landmark acoustic invention. In this paper, the phonograph is presented as a tool for education in acoustics. A brief history of the phonograph is outlined and an analogous circuit model that describes its dynamic response is discussed. Microphone and scanning laser Doppler vibrometer (SLDV) measurements were made on a homemade phonograph for model validation and inversion for unknown model parameters. SLDV measurements also conclusively illustrate where model assumptions are violated. The model elements which dominate the dynamic response are discussed.

  4. The Invention Factory: Thomas Edison's Laboratories. Teaching with Historic Places.

    Science.gov (United States)

    Bolger, Benjamin

    This lesson explores the group of buildings in West Orange, New Jersey, built in 1887, that formed the core of Thomas Edison's research and development complex. They consisted of chemistry, physics, and metallurgy laboratories; machine shop; pattern shop; research library; and rooms for experiments. The lesson explains that the prototypes (ideas…

  5. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - presentation

    Science.gov (United States)

    The EPA’s Urban Watershed Management Branch has been monitoring an instrumented 110-space pervious pavement parking lot. The lot is used by EPA personnel and visitors to the Edison Environmental Center. The design includes 28-space rows of three permeable pavement types: asphal...

  6. Using OFI libfabric on Cori/Edison

    Energy Technology Data Exchange (ETDEWEB)

    Pritchard, Howard Porter [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Choi, Sung-Eun [Cray, Inc., Seattle, WA (United States)

    2016-08-22

    These are slides from a presentation during an NERSC site visit to Los Alamos National Laboratory. The following topics are covered: building/installing libfabric, OpenMPI using libfabric, MPICH using libfabric, Open SHMEM (Sandia), other applications, and what is next. The next steps are: get a libfabric 1.4 out, it would be nice to have libfabric 1.4 installed in system space on Cori, add libfabric modules on Cori, might be a good idea to have a SLURM PMI module to simplify its use when building/using Open MPI and MPICH built to use libfabric, and upgrade Edison to CLE 5.2 UP04 or newer.

  7. EDISON - research programme on electric distribution automation 1993-1997. Final report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M [ed.; VTT Energy, Espoo (Finland). Energy Systems

    1998-08-01

    This report comprises a summary of the results of the five year research programme EDISON on distribution automation in Finnish utilities. The research programme (1993 - 1997) was conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of the funding has been from the Technology Development Centre TEKES and from manufacturing companies. The goal of the research programme was to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer associated automation functions. In addition, the techniques for demand side management were developed and integrated into the automation scheme. The final aim was to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of nineteen projects are given in this report

  8. The energy efficiency partnership - Kraft General Foods and Boston Edison Company

    International Nuclear Information System (INIS)

    Crowley, J.C.; Donoghue, J.P.

    1993-01-01

    During the past twenty years, inordinate shifts in the supply and demand of energy have forced both electric utility companies and their customers to investigate new and innovative ways to satisfy the ever increasing demand for electricity. The Energy Efficiency Partnership, developed between Kraft General Foods and Boston Edison Company, presents an exemplary study of how two corporate giants creatively solved the problem of uncontrolled energy costs and its positive effect on the overall operations of Kraft General Foods, Framingham. But the Energy Efficiency Partnership did more than reduce energy costs, it provided benefits to all parties on the playing field. To understand its significance, a review of the partnership's history is paramount. The first official announcement of the Energy Efficiency Partnership was made on April 9, 1990. Framingham, MA, The Commonwealth of Massachusetts Kraft General Foods Framingham, and Boston Edison Company have joined forces in a $3.6 million dollar energy partnership that will help keep 250 industrial jobs in Massachusetts and could lead to the future expansion of the international food company's Framingham facility

  9. EDISON-WMW: Exact Dynamic Programing Solution of the Wilcoxon–Mann–Whitney Test

    Directory of Open Access Journals (Sweden)

    Alexander Marx

    2016-02-01

    Full Text Available In many research disciplines, hypothesis tests are applied to evaluate whether findings are statistically significant or could be explained by chance. The Wilcoxon–Mann–Whitney (WMW test is among the most popular hypothesis tests in medicine and life science to analyze if two groups of samples are equally distributed. This nonparametric statistical homogeneity test is commonly applied in molecular diagnosis. Generally, the solution of the WMW test takes a high combinatorial effort for large sample cohorts containing a significant number of ties. Hence, P value is frequently approximated by a normal distribution. We developed EDISON-WMW, a new approach to calculate the exact permutation of the two-tailed unpaired WMW test without any corrections required and allowing for ties. The method relies on dynamic programing to solve the combinatorial problem of the WMW test efficiently. Beyond a straightforward implementation of the algorithm, we presented different optimization strategies and developed a parallel solution. Using our program, the exact P value for large cohorts containing more than 1000 samples with ties can be calculated within minutes. We demonstrate the performance of this novel approach on randomly-generated data, benchmark it against 13 other commonly-applied approaches and moreover evaluate molecular biomarkers for lung carcinoma and chronic obstructive pulmonary disease (COPD. We found that approximated P values were generally higher than the exact solution provided by EDISON-WMW. Importantly, the algorithm can also be applied to high-throughput omics datasets, where hundreds or thousands of features are included. To provide easy access to the multi-threaded version of EDISON-WMW, a web-based solution of our algorithm is freely available at http://www.ccb.uni-saarland.de/software/wtest/.

  10. Thomas Edison, le magicien de Menlo Park la vie lumineuse d'un inventeur insatiable

    CERN Document Server

    Reyners, Benjamin; Klein-Scholz, Christelle

    2015-01-01

    Découvrez enfin tout ce qu'il faut savoir sur Thomas Edison et ses inventions en moins d'une heure ! Inventeur de génie, Thomas Edison est aussi l'un des plus prolifiques de tous les temps. Pourtant, rien ne laissait présager un tel destin... Peu scolarisé, il est d'abord vendeur de journaux à 12 ans, puis télégraphiste à 15, avant de devenir l'un des meilleurs ingénieurs de Wall Street à seulement 22 ans. Il ne cesse dès lors d'accumuler les succès. Doté d'une curiosité insatiable et passionné depuis l'enfance par les expériences en tous genres, il crée coup sur coup les plus grandes inventio

  11. Mobile incineration services at Commonwealth Edison's nuclear stations

    International Nuclear Information System (INIS)

    Smith, K.R.

    1985-01-01

    As the costs for low-level waste disposal escalate, and as the January 1, 1986 date draws nearer, utilities throughout the United States are formulating and implementing plans to reduce the volumes of the low-level radioactive waste being generated at their nuclear power stations. Techniques being used to accomplish this goal range from sorting of dry active waste to complete volume reduction systems, like the Aerojet VR Systems being installed at Commonwealth Edison's Byron and Braidwood Stations. In between these extremes are partial solutions to the problem, including compaction, shredding and compaction, super-compaction, resin dewatering, liquid drying, and now, mobile incineration. In June, 1983, Commonwealth Edison Company (CECO) of Chicago, Illinois, contracted Aerojet Energy Conversion Company (AECC) of Sacramento, California, to supply mobile VR services to the Dresden, La Salle, Quad Cities, and Zion Nuclear Stations. Per the contract, AECC is responsible for the design, fabrication, delivery, operation, and maintenance of a Mobile Volume Reduction System (MVRS) capable of processing combustible dry active waste and contaminated oil generated at these Com-Ed facilities. Initial commercial operation of the MVRS is planned for the Dresden Nuclear Power Station in May, 1985. This paper is intended to summarize some of the key elements resulting from the design, fabrication, and testing of the MVRS. In addition, it is intended to identify the tasks a potential user of the MVRS service must complete in order to receive permission from the Nuclear Regulatory Commission to operate the MVRS at their site

  12. No Underskirts in Africa: Edison Carneiro and the "Lineages" of Afro-Brazilian Religious Anthropology

    Directory of Open Access Journals (Sweden)

    Yvonne Maggie

    2015-04-01

    Full Text Available The article presents the folklorist, essayist, journalist and anthropologist Edison Carneiro (1912-1972 and situates him among the “lineages” or intellectual affiliations in the context of studies on Afro-Brazilian religious groups. Describing the life of Edison Carneiro, his relationship with American anthropologist Ruth Landes and his participation in the folkloric movement, I look to situate Carneiro among the various intellectual trends found within the study of Afro-Brazilian religions. I argue that the author occupied an ambiguous position in terms of the African presence in the constitution of Afro-Brazilian religions, showing close proximities to Ruth Landes, Franklin Frazier, Ruth Benedict, Donald Pierson and Robert Park on the one hand, and Melville Herskovitz, Roger Bastide and Arthur Ramos on the other. Carneiro’s studies of Candomblé de Caboclo express this double bind.

  13. Southern California Edison instrument setpoint program

    International Nuclear Information System (INIS)

    Bockhorst, R.M.; Quinn, E.L.

    1991-01-01

    In November of 1989, the US Nuclear Regulatory Commission (NRC) conducted an electrical safety system functional inspection (ESSFI) at the San Onofre nuclear generating station (SONGS), which was followed by an NRC audit on instrument setpoint methodology in January 1991. Units 2 and 3 at SONGS are 1100-MW(electric) Combustion Engineering (C-E) pressurized water reactors (PWRs) operated by Southern California Edison (SCE). The purpose of this paper is to summarize the results of the NRC audit and SCE's follow-up activities. The NRC team inspection reinforced the need to address several areas relative to the SCE setpoint program. The calculations withstood the intensive examination of four NRC inspectors for 2 weeks and only a few minor editorial-type problems were noted. Not one of the calculated plant protections system setpoints will change as a result of the audit. There were no questions raised relative to setpoint methodology

  14. PREFACE: 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19)

    Science.gov (United States)

    González, T.; Martín-Martínez, M. J.; Mateos, J.

    2015-10-01

    The 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19) was held at the Hospedería Fonseca (Universidad de Salamanca, Spain), on 29 June - 2 July, 2015, and was organized by the Electronics Area from the University of Salamanca. The Conference is held biannually and covers the recent progress in the field of electron dynamics in solid-state materials and devices. This was the 19th meeting of the international conference series formerly named Hot Carriers in Semiconductors (HCIS), first held in Modena in 1973. In the edition of 1997 in Berlin the name of the conference changed to International Conference on Nonequilibrium Carrier Dynamics in Semiconductors, keeping the same acronym, HCIS; and finally in the edition of Montpellier in 2009 the name was again changed to the current one, International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON). The latest editions took place in Santa Barbara, USA, in 2011 and Matsue, Japan, in 2013. Research work on electron dynamics involves quite different disciplines, and requires both fundamental and technological scientific efforts. Attendees to the conference come mostly from academic institutions, belonging to both theoretical and experimental groups working in a variety of fields, such as solid-state physics, electronics, optics, electrical engineering, material science, laser physics, etc. In this framework, events like the EDISON conference become a basic channel for the progress in the field. Here, researchers working in different areas can meet, present their latest advances and exchange their ideas. The program of EDISON'19 included 13 invited papers, 61 oral contributions and 73 posters. These contributions originated from scientists in more than 30 different countries. The Conference gathered 140 participants, coming from 24 different countries, most from Europe, but also with a significant participation

  15. A self-assessment program for Commonwealth Edison Company

    International Nuclear Information System (INIS)

    Garner, D.; Krowzak, F.; Wishau, R.

    1987-01-01

    This paper explains the assessment program developed by Commonwealth Edison Company (CECo) to evaluate the effectiveness of technical activities at its nuclear generating stations. The technical activities evaluated are in the areas of chemistry, emergency planning, radiation protection, and radioactive waste operations. The stations have technical programs for each of these areas and are set up to comply with applicable governmental laws and regulations, industry guidelines, and corporate policies and procedures. Reviews and audits need to be performed to ensure that technical program objectives are being met and that the programs are progressing as intended. Many organizations, including the Institute of Nuclear Power Operations, U.S. Nuclear Regulatory Commission, American Nuclear Insurers, and the CECo Quality Assurance Department perform such reviews and audits, which generate a wide variety of information on the stations' activities

  16. Benchmark of the CASMO-3G/MICROBURN-B codes for Commonwealth Edison boiling water reactors

    International Nuclear Information System (INIS)

    Wheeler, J.K.; Pallotta, A.S.

    1992-01-01

    The Commonwealth Edison Company has performed an extensive benchmark against measured data from three boiling water reactors using the Studsvik lattice physics code CASMO-3G and the Siemens Nuclear Power three-dimensional simulator code MICROBURN-B. The measured data of interest for this benchmark are the hot and cold reactivity, and the core power distributions as measured by the traversing incore probe system and gamma scan data for fuel pins and assemblies. A total of nineteen unit-cycles were evaluated. The database included fuel product lines manufactured by General Electric and Siemens Nuclear Power, wit assemblies containing 7 x 7 to 9 x 9 pin configurations, several water rod designs, various enrichments and gadolina loadings, and axially varying lattice designs throughout the enriched portion of the bundle. The results of the benchmark present evidence that the CASMO-3G/MICROBURN-B code package can adequately model the range of fuel and core types in the benchmark, and the codes are acceptable for performing neutronic analyses of Commonwealth Edison's boiling water reactors

  17. Nuclear criticality safety assessment of the Consolidated Edison Uranium-Solidification Program Facility

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1984-01-01

    A nuclear criticality assessment of the Consolidated Edison Uranium-Solidification Program facility confirms that all operations involved in the process may be conducted with an acceptable margin of subcriticality. Normal operation presents no concern since subcriticality is maintained by design. Several recommendations are presented to prevent, or mitigate the consequences of, any abnormal events that might occur in the various portions of the process. These measures would also serve to reduce to a minimum the administrative controls required to prevent criticality

  18. Thomas Edison State College and Colorado State University: Using Cutting-Edge Technology to Enhance CE Unit Success

    Science.gov (United States)

    van Zyl, Henry; Powell, Albert, Jr.

    2012-01-01

    Thomas Edison State College (TESC) and Colorado State University (CSU) offer significant contrasts in institutional culture, student demographics, faculty and institutional priorities and approaches to distance education course development and delivery. This article offers case studies showing that widely disparate program design and delivery…

  19. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  20. 77 FR 23275 - Notice of Availability of the Draft enXco Desert Harvest Solar Farm Project Environmental Impact...

    Science.gov (United States)

    2012-04-18

    ... Southern California Edison regional transmission grid. If the project is approved, construction would begin... 1610.2 Thomas Pogacnik, Deputy State Director. [FR Doc. 2012-9338 Filed 4-13-12; 4:15 pm] BILLING CODE...

  1. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals Associated with Deicing Chemicals from Edison Parking Lot, NJ

    Science.gov (United States)

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  2. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals associated with Deicing Chemicals from Edison Parking Lot, NJ - abstract

    Science.gov (United States)

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  3. 77 FR 1667 - Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, Respondent...

    Science.gov (United States)

    2012-01-11

    ..., Rio De Janeiro, R.J., Brazil 20531-070, Respondent; Order Relating to Nelson S. Galgoul The Bureau of... entry of the Order, Nelson S. Galgoul, with a last known address of Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, and when acting for or on his behalf, his representatives, assigns...

  4. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  5. A Project in Thermal Physics Involving a Car Parked in Direct Sunlight

    Science.gov (United States)

    Lee, Wei; Gilley, Heidi L.; Caris, Joshua B.

    1997-05-01

    A research project for introductory physics students, involving an estimate of the surface temperature of the Sun using a parked car, was carried out in the Summer 1995 Research Apprenticeships in Science Program, sponsored by Edison Industrial Systems Center, for local-area high school students. This activity entails both outdoor quantitative observations and theoretical analysis, and yields a result within 12 percent of the accepted value. It was demonstrated that the use of everyday materials and outdoor observations, such as those in this project, is not only educational but also intriguing. The success of this experiment as a summer research project will be discussed.

  6. NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

    2014-06-01

    In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

  7. Psychological health damage as an environmental effect: Metropolitan Edison Co. v. People Against Nuclear Energy

    International Nuclear Information System (INIS)

    Hoff, E.H.

    1984-01-01

    The Supreme court took a narrow view of the term environmental in Metropolitan Edison Co. v. People Against Nuclear Energy when it stated that the purpose of the National Environmental Policy Act (NEPA) is to protect the physical environment. Psychological health damage caused by the perception of the risk of a nuclear accident is not an environmental effect cognizable under NEPA unless their is a demonstrable relationship. Litigants seeking the protection of NEPA must carefully examine the origin and nature of alleged psychological harms and frame their complains to establish a close relationship between a change in the physical environment and the alleged psychological harm

  8. Update to Permeable Pavement Research at the Edison ...

    Science.gov (United States)

    The EPA’s Urban Watershed Management Branch (UWMB) has been monitoring the permeable pavement demonstration site at the Edison Environmental Center, NJ since 2010. This site has three different types of permeable pavements including interlocking concrete permeable pavers, pervious concrete, and porous asphalt. The permeable pavements are limited to parking spaces while adjacent driving lanes are impermeable and drain to the permeable surfaces. The parking lot is instrumented for continuous monitoring with thermistors and water content reflectometers that measure moisture as infiltrate passes through the storage gallery beneath the permeable pavements into the underlying native soil. Each permeable surface of the parking lot has four lined sections that capture infiltrate in tanks for water quality analyses; these tanks are capable of holding volumes up to 4.1 m3, which represents up to 38 mm (1.5 in.) for direct rainfall on the porous pavement and runoff from adjacent driving lanes that drain into the permeable surface.Previous technical releases concerning the demonstration site focused on monitoring techniques, observed chloride and nutrient concentrations, surface hydrology, and infiltration and evaporation rates. This presentation summarizes these past findings and addresses current water quality efforts including pH, solids analysis, total organic carbon, and chemical oxygen demand. Stormwater runoff continues to be a major cause of water pollution in

  9. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  10. 75 FR 25288 - Notice of Availability of the Draft Environmental Impact Report and Draft Environmental Impact...

    Science.gov (United States)

    2010-05-07

    ... Statement for the Southern California Edison Eldorado-Ivanpah Transmission Project, California and Nevada... need for the EITP project is to respond to Southern California Edison's (SCE) application for a right.... Authority: 40 CFR 1506.6, 1506.10, and 43 CFR 1610.2 Thomas Pogacnik, Deputy State Director. [FR Doc. 2010...

  11. Processing of sump sludges at the Commonwealth Edison Byron Nuclear Generating Station

    International Nuclear Information System (INIS)

    Herrmann, D.; Gardner, D.A.; Taylor, E.R. Jr.

    1990-01-01

    A basic criterion for the disposal of radioactive waste by shallow land burial is that the material must not contain free liquids. In addition burial sites' requirements regarding radioactive waste containing oils, even though solidified, are restrictive. At Commonwealth Edison Byron Nuclear Generating Station a methodology for processing treated waste sludges, originating form the turbine building's floor drains was developed and implemented. As a result of this effort, 322 drums of oil and water sludge were processed. A dry cake, i.e., no free liquids, was produced, packaged, and readied for disposal. The dry cake contained less than 2% oil. The liquid phases resulting from the processing of the treated waste sludge were oil (that was to be processed for disposal as non-radioactive) and filtrate containing less than 5 ppm total suspended solids (TSS) and oil/grease. The filtrate TSS was below the Station's National Pollution Discharge Elimination System (NPDES) permit release limits. 4 figs

  12. Project to demonstrate potential energy savings from industrial customers. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The full potential for electric load management was determined with respect to the industrial sector by adopting direct load management techniques. Certain options available to regulatory authorities and individual utilities to conserve energy are highlighted. By conducting a demonstration project on a representative sample of primary industrial customers, information could be obtained on the potential impact of direct load management methods and other end-use conservation programs on a system-wide basis or multi-system-wide basis. The study was conducted by the Michigan Public Service Commission in cooperation with the Detroit Edison Company.

  13. Highlights from e-EPS: Jean-Michel Raimond wins EPS Edison-Volta Prize 2014

    CERN Multimedia

    Martina Knoop, e-EPS News

    2014-01-01

    e-EPS News is a monthly addition to the CERN Bulletin line-up, showcasing articles from e-EPS – the European Physical Society newsletter – as part of a collaboration between the two publications.   The European Physical Society has the pleasure to announce that the 2014 EPS Edison-Volta Prize is awarded to Jean-Michel Raimond for “seminal contribution to physics (that) have paved the way for novel explorations of quantum mechanics and have opened new routes in quantum information processing”. J.-M. Raimond’s PhD thesis was supervised by Serge Haroche at the École Normale Supérieure in Paris, France, in the early 1980′s, and together S. Haroche, M. Brune and J.-M. Raimond have built an extremely successful research group since then. J.-M. Raimond has made seminal contributions to the development of cavity QED experiments, in particular involving circular Rydberg atoms interacting with very high-Q superc...

  14. Alexander Graham Bell's Patent for the Telephone and Thomas Edison's Patent for the Electric Lamp. The Constitution Community: The Development of the Industrial United States (1870-1900).

    Science.gov (United States)

    Schur, Joan Brodsky

    In 1876 Americans held a Centennial Exhibition in Philadelphia (Pennsylvania) to celebrate the nation's birth 100 years earlier. Machinery Hall drew the most admiration and wonder. Alexander Graham Bell exhibited the first telephone, and Thomas Alva Edison presented the automatic telegraph, one of more than 1,000 inventions he would patent in his…

  15. Heritage plaza parking lots improvement project- Solar PV installation

    Energy Technology Data Exchange (ETDEWEB)

    Hooks, Todd [Agua Caliente Indian Reservation, Palm Springs, CA (United States)

    2017-03-31

    The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.

  16. 75 FR 80068 - Notice of Availability of the Final Environmental Impact Report/Final Environmental Impact...

    Science.gov (United States)

    2010-12-21

    ... Statement for the Southern California Edison Eldorado-Ivanpah Transmission Project, California and Nevada... respond to Southern California Edison's (SCE) application under Title V of the FLPMA (43 USC 1761) for.... Thomas Pogacnik, Deputy State Director. [FR Doc. 2010-31970 Filed 12-17-10; 8:45 am] BILLING CODE 4310-40...

  17. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  18. Summary of Dissimilar Metal Joining Trials Conducted by Edison Welding Institute

    Energy Technology Data Exchange (ETDEWEB)

    MJ Lambert

    2005-11-18

    Under the direction of the NASA-Glenn Research Center, the Edison Welding Institute (EWI) in Columbus, OH performed a series of non-fusion joining experiments to determine the feasibility of joining refractory metals or refractory metal alloys to Ni-based superalloys. Results, as reported by EWI, can be found in the project report for EWI Project 48819GTH (Attachment A, at the end of this document), dated October 10, 2005. The three joining methods used in this investigation were inertia welding, magnetic pulse welding, and electro-spark deposition joining. Five materials were used in these experiments: Mo-47Re, T-111, Hastelloy X, Mar M-247 (coarse-grained, 0.5 mm to several millimeter average grain size), and Mar M-247 (fine-grained, approximately 50 {micro}m average grain size). Several iterative trials of each material combination with each joining method were performed to determine the best practice joining method. Mo-47Re was found to be joined easily to Hastelloy X via inertia welding, but inertia welding of the Mo-alloy to both Mar M-247 alloys resulted in inconsistent joint strength and large reaction layers between the two metals. T-111 was found to join well to Hastelloy X and coarse-grained Mar M-247 via inertia welding, but joining to fine-grained Mar M-247 resulted in low joint strength. Magnetic pulse welding (MPW) was only successful in joining T-111 tubing to Hastelloy X bar stock. The joint integrity and reaction layer between the metals were found to be acceptable. This single joining trial, however, caused damage to the electromagnetic concentrators used in this process. Subsequent design efforts to eliminate the problem resulted in a loss of power imparted to the accelerating work piece, and results could not be reproduced. Welding trials of Mar M-247 to T-111 resulted in catastrophic failure of the bar stock, even at lower power. Electro-spark deposition joining of Mo-47Re, in which the deposited material was Hastelloy X, did not have a

  19. Summary of Dissimilar Metal Joining Trials Conducted by Edison Welding Institute

    International Nuclear Information System (INIS)

    MJ Lambert

    2005-01-01

    Under the direction of the NASA-Glenn Research Center, the Edison Welding Institute (EWI) in Columbus, OH performed a series of non-fusion joining experiments to determine the feasibility of joining refractory metals or refractory metal alloys to Ni-based superalloys. Results, as reported by EWI, can be found in the project report for EWI Project 48819GTH (Attachment A, at the end of this document), dated October 10, 2005. The three joining methods used in this investigation were inertia welding, magnetic pulse welding, and electro-spark deposition joining. Five materials were used in these experiments: Mo-47Re, T-111, Hastelloy X, Mar M-247 (coarse-grained, 0.5 mm to several millimeter average grain size), and Mar M-247 (fine-grained, approximately 50 (micro)m average grain size). Several iterative trials of each material combination with each joining method were performed to determine the best practice joining method. Mo-47Re was found to be joined easily to Hastelloy X via inertia welding, but inertia welding of the Mo-alloy to both Mar M-247 alloys resulted in inconsistent joint strength and large reaction layers between the two metals. T-111 was found to join well to Hastelloy X and coarse-grained Mar M-247 via inertia welding, but joining to fine-grained Mar M-247 resulted in low joint strength. Magnetic pulse welding (MPW) was only successful in joining T-111 tubing to Hastelloy X bar stock. The joint integrity and reaction layer between the metals were found to be acceptable. This single joining trial, however, caused damage to the electromagnetic concentrators used in this process. Subsequent design efforts to eliminate the problem resulted in a loss of power imparted to the accelerating work piece, and results could not be reproduced. Welding trials of Mar M-247 to T-111 resulted in catastrophic failure of the bar stock, even at lower power. Electro-spark deposition joining of Mo-47Re, in which the deposited material was Hastelloy X, did not have a

  20. Exploring Distributed Energy Alternatives to Electrical Distribution Grid Expansion in Souhern California Edison Service Territory

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Therese K [ORNL; Kingston, Tim [Gas Technology Institute

    2005-12-01

    Distributed energy (DE) technologies have received much attention for the energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention have been the desires to globally reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and concerns with interconnection on the distribution system. This study assesses the costs and benefits of DE to both consumers and distribution utilities and expands upon a precursory study done with Detroit Edison (DTE)1, by evaluating the combined impact of DE, energy-efficiency, photovoltaics (a use of solar energy), and demand response that will shape the grid of the future. This study was funded by the U.S. Department of Energy (DOE), Gas Research Institute (GRI), American Electric Power (AEP), and Gas Technology Institute's (GTI) Distributed Energy Collaborative Program (DECP). It focuses on two real Southern California Edison (SCE) circuits, a 13 MW suburban circuit fictitiously named Justice on the Lincoln substation, and an 8 MW rural circuit fictitiously named Prosper on the Washington Substation. The primary objectives of the study were threefold: (1) Evaluate the potential for using advanced energy technologies, including DE, energy-efficiency (EE), demand response, electricity storage, and photovoltaics (PV), to reshape electric load curves by reducing peak demand, for real circuits. (2) Investigate the potential impact on guiding technology deployment and managing operation in a way that benefits both utilities and their customers by: (a) Improving grid load factor for utilities; (b) Reducing energy costs for customers; and (c) Optimizing electric demand growth. (3) Demonstrate benefits by reporting on a recently installed advanced energy system at a utility customer site

  1. Electric vehicle integration in a real-time market

    DEFF Research Database (Denmark)

    Pedersen, Anders Bro

    with an externally simulated model of the power grid, it is be possible, in real-time, to simulate the impact of EV charging and help to identify bottlenecks in the system. In EDISON the vehicles are aggregated using an entity called a Virtual Power Plant (VPP); a central server monitoring and controlling...... the distributed energy resources registered with it, in order to make them appear as a single producer in the eyes of the market. Although the concept of a VPP is used within the EcoGrid EU project, the idea of more individual control is introduced through a new proposed real-time electricity market, where......This project is rooted in the EDISON project, which dealt with Electrical Vehicle (EV) integration into the existing power grid, as well as with the infrastructure needed to facilitate the ever increasing penetration of fluctuating renewable energy resources like e.g. wind turbines. In the EDISON...

  2. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  3. Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2002-01-01

    Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

  4. Thomas Edison Accelerated Elementary School.

    Science.gov (United States)

    Levin, Henry M.; Chasin, Gene

    This paper describes early outcomes of a Sacramento, California, elementary school that participated in the Accelerated Schools Project. The school, which serves many minority and poor students, began training for the project in 1992. Accelerated Schools were designed to advance the learning rate of students through a gifted and talented approach,…

  5. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  6. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  7. The solar two power tower project

    International Nuclear Information System (INIS)

    Chavez, J.M.; Klimas, P.C.; Laquil, P. de III; Skowronski, M.

    1993-01-01

    A consortium of United States utility concerns led by Southern California Edison Company (SCE) has begun a cooperative project with the U.S. Department of Energy (DOE) and industry to convert the 10-MWe Solar One Tower Pilot Plant to molten nitrate salt technology. Successful operation of the convert plant to be called Solar Two, will reduce the economic risks in building the initial commercial power tower projects and accelerate the commercial acceptance of this promising renewable energy technology. In a molten salt power tower plant, sunlight is concentrated by a field of sun-tracking mirrors, called heliostats, onto a centrally located receiver, atop a tower. Molten salt is heated in the receiver and stored until it is needed to generate steam to power a conventional turbine generator. Joining the SCE and DOE in sponsoring in sponsoring this project are the following organizations: Los Alamos department of Water Power, Idaho Power Company, PacifiCorp, Pacific Gas and Electric Company, Sacramento Municipal Utility District, Arizona Public Service Company, Salt River Project, City of Pasadena, California Energy Commission, Electric Power Research Institute, South Coast Air Quality Commission, Electric Power research Institute, South Coast Air Quality Management District, and Bechtel Corporation. The Solar Two project will convert the Solar One heat transfer system from a water/steam type to molten nitrate salt by replacing the water/steam receiver and oil/rock thermal storage system with a nitrate salt receiver, salt thermal storage, and steam generator. The estimate cost of Solar Two, including 3-year test period, is 48.5 millions. The plant will be on line in early 1995. (authors)

  8. Numeric models of distributed power generators and stores and their adaptation to the simulation softwaare (e.g. System NETOMAC). Simulation models for long-term operation. Project 5: Numeric models. Final report; Numerische Modelle der dezentralen Energieerzeuger und Speicher, und ihre Anpassung an die Simulationssoftware (u.a. System NETOMAC). Simulationsmodelle fuer den Langzeitbereich. Teilprojekt 5: Numerische Modelle. Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Orths, A.; Bachry, A.; Lebioda, A.; Purmann, M.

    2003-09-01

    In the key project 'EDISON', new technologies for electric power supply are investigated systematically. This comprised the development of mathematical models for commercial planning software (NETOMAC) for different decentral power generation systems like cogeneration systems, wind power systems, PV systems and fuel cells. The models will provide integration scenarios including sites for optimal network integration, optimisation of network operation, and network feedback effects. Prior to the start of the project, the available planning software did not include such models, so that the effects of decentral power generation and storage systems in electric power supply grids could not be investigated. (orig.) [German] Im Leitprojekt 'EDISON' wird der Einsatz neuer Technologie in elektrischen Energieversorgungsnetzen systemtechnisch untersucht. Dafuer werden sowohl fuer verschiedene Speicher wie Batteriespeicher, als auch unterschiedliche dezentrale Erzeugungseinheiten wie BHKW, Windkraftanlagen, Photovoltaikanlagen und Brennstoffzellen mathematische Modelle fuer uebliche Planungssoftware (NETOMAC) erarbeitet. Mit den Modellen sollen Einsatzszenarien fuer diese Betriebsmittel abgeleitet und anhand dynamischer Simulationsrechnungen Standorte der optimalen Netzanbindung, die Optimierung des Netzbetriebs und Netzrueckwirkung untersucht werden koennen. Vor Beginn des Projektes fehlten entsprechende Modelle in vorhandener Planungssoftware, so dass die Wirkung von dezentralen Erzeugern und Speichern in elektrischen Energieversorgungsnetzen nicht untersucht werden konnte. (orig.)

  9. Thomas Alva Edison—battery and device innovation in response to application's needs

    Science.gov (United States)

    Salkind, Alvin J.; Israel, Paul

    Thomas Alva Edison, the most prolific inventor in North America, with over 1000 patents, was the descendant of early settlers from the Netherlands to the Hudson Valley region of New York/New Jersey. However, his genealogical trail encompasses many cities, provinces, states, and countries, including Holland, France, Scotland, New Amsterdam, New York, New Jersey, Nova Scotia, Ontario, Ohio, and Michigan. He was motivated to develop and invent in response to perceived needs of commercial devices and was the creator of the concept of an industrial research laboratory. His activities covered a wide-range of chemical, electrical, medical, metallurgical, entertainment, and communication devices and led to the creation of major worldwide industries. However, his expressed underlying concern was the "service it might give others". This presentation reviews commercial developments in comparison with the technologies and motivations of the time and is illustrated by material from the Rutgers University 'Edison Papers Project', Edison's personal notes found in the Edison Battery Factory and preserved by Professor Salkind, and records of The Electrochemical Society.

  10. INDEX - a solution to the high cost of processing transient workers

    International Nuclear Information System (INIS)

    Stroupe, E.P.

    1987-01-01

    In 1985 twelve midwestern utilities formed the Nuclear Employee Data System for the US Nuclear Regulatory Commission's (NRC's) Region III (NEDS III) group. These utilities are Cleveland Electric Illuminating Company, Commonwealth Edison Company, Consumers Power Company, Detroit Edison Company, Illinois Power Company, Indiana and Michigan Electric Company, Iowa Electric Light and Power Company, Northern States Power Company, Toledo Edison Company, Union Electric Company, and Wisconsin Public Service Corporation. Early in 1986, Kansas Gas and Electric of NRC's Region IV joined the group and a cost-benefit study of a nuclear employee data system was initiated. The purpose of this system is to reduce the cost of processing workers requiring unescorted access to nuclear power plants. The involved utilities continued this project as the Integrated Nuclear Data Exchange (INDEX). In 1987 the following additional utilities joined INDEX: Houston Lighting and Power, Pacific Gas and Electric, Texas Utilities Electric Company, Arkansas Power and Light, Louisiana Power and Light, Systems Energy Resources Inc., and Southern California Edison. This paper summarizes the results of the study and discusses the current status of the program

  11. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  12. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  13. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  14. 76 FR 57073 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed enXco Desert...

    Science.gov (United States)

    2011-09-15

    ... the Southern California Edison regional transmission grid. If approved, project construction would.... Thomas Pogacnik, Deputy State Director, Natural Resources. Authority: 40 CFR 1501.7 and 43 CFR 1610.2 [FR...

  15. 75 FR 25238 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2010-05-07

    ... Ends: 06/28/2010, Contact: Thomas H. Stephan, 215-897-4916. EIS No. 20100163, Final EIS, BOP, 00... EIS, BLM, 00, Southern California Edison's Eldorado-Ivanpah Transmission Line Project, Construction...

  16. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  17. 75 FR 1801 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed First Solar Desert...

    Science.gov (United States)

    2010-01-13

    ... the Southern California Edison regional transmission grid. Should the project be approved, the... public review, we cannot guarantee that we will be able to do so. Thomas Pogacnik, Deputy State Director...

  18. Integrated-plant-safety assessment Systematic Evaluation Program. Dresden Nuclear Power Station, Unit 2, Commonwealth Edison Company, Docket No. 50-237

    International Nuclear Information System (INIS)

    1982-10-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of Dresden Nuclear Generating Station, Unit 2 owned and operated by the Commonwealth Edison Company and located in Grundy County, Illinois. Dresden Unit 2 is one of ten plants reviewed under Phase II of this program, which indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  19. 75 FR 49515 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Science.gov (United States)

    2010-08-13

    ... megawatt (MW) solar photovoltaic project which would connect to an existing Southern California Edison 33.... Thomas Pogacnik, Deputy State Director, Natural Resources. Authority: 40 CFR 1506.6 and 1506.10 and 43...

  20. Coolside Waste Management Research. Final report, April 23, 1991--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    This study was initiated during a successful test of the Coolside flue gas desulfurization technology at Ohio Edison`s Edgewater generating station in 1991. Coolside is a lime duct technology which is installed on the downstream side of the last heat exchanger. As tested by Ohio Edison, it also employs an alkali reagent, in this case NaOH, to enhance sulfur capture. The overall goal of this study was to develop sufficient chemical and physical data to insure the environmentally safe disposal of the material. This final report summarizes the important aspects of the project, but it does not present all of the data that was produced. Further details may be found in the monthly and quarterly reports that were filed with the Morgantown Energy Technology Center. This report is organized into six chapters which present the important conclusions of the principal areas of investigation.

  1. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Science.gov (United States)

    2012-11-13

    ... California Edison regional transmission grid. If approved, construction would begin in late 2013 and would..., 40 CFR 1506.10, 43 CFR 1610.2; 43 CFR 1610.5. Thomas Pogacnik, Deputy State Director, California. [FR...

  2. Interoperability of Demand Response Resources Demonstration in NY

    Energy Technology Data Exchange (ETDEWEB)

    Wellington, Andre

    2014-03-31

    The Interoperability of Demand Response Resources Demonstration in NY (Interoperability Project) was awarded to Con Edison in 2009. The objective of the project was to develop and demonstrate methodologies to enhance the ability of customer sited Demand Response resources to integrate more effectively with electric delivery companies and regional transmission organizations.

  3. On-grid PV implementation program. Phase I report, August 1994--January 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-29

    Southern California Edison Company (Edison) is finalizing a Cooperative Agreement with the U.S. Department of Energy (DOE) to develop high value On-Grid applications for electricity from Photovoltaics (PV). Edison`s efforts are the result of Edison`s long-standing commitment to the pursuit of Renewable Energy. Edison has been a world leader in the development and use of PV. As the technology becomes more commercial, Edison has been actively seeking more applications for PV. After strenuous effort, Edison has now received approval to offer off-grid PV packages within its service territory. In addition, Edison has been very interested in finding high-value on-grid PV applications that may have the potential to become cost effective as PV applications increase and prices decline. Such high-value applications at Edison and other utilities will accelerate the price reductions, which in turn will increase the number of cost-effective applications, driving towards a market competitive with traditional sources of energy. Edison`s efforts build upon the work done by Pacific Gas & Electric (PG&E) at their Kerman substation, but goes much further than that effort. Edison submitted its original proposal to the DOE on June 30, 1993. A revised proposal was submitted on February 1, 1994, in response to a letter from the DOE`s Director of Solar Energy, Robert H. Annan. In a letter dated March 30, 1994, from Paul K. Kearns, Head of Contracting Activity for the DOE`s Golden Field Office, the DOE conditionally approved certain pre-award contract costs. The Cooperative Agreement with DOE was executed on August 16, 1994.

  4. 76 FR 21402 - Notice of Availability of the Final Environmental Impact Statement for the Desert Sunlight...

    Science.gov (United States)

    2011-04-15

    ... Southern California Edison (SCE) of the new 500/220-kV Red Bluff Substation, where the project would.... Authority: 40 CFR 1506.6 and 1506.10; 43 CFR 1610.2 and1610.5. Thomas Pogacnik, Deputy State Director...

  5. Develop Improved Materials to Support the Hydrogen Economy

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Michael C. Martin

    2012-07-18

    The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects with near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.

  6. From state to market and back again: Egypt's experiment with independent power projects

    International Nuclear Information System (INIS)

    Eberhard, Anton; Gratwick, Katharine

    2007-01-01

    This paper focuses on Egypt's three independent power projects (IPPs), evaluating the context in which they were developed as well as how the context has changed. Initially the Egyptian government planned a series of 15 gas-fired, steam cycle, independent power projects. The first three, developed by InterGen, Edison and Electricite de France (EdF), yielded among the lowest generation tariffs across the developing world at US$0.025 per kilowatt hour (kWh). After the currency devaluation of 2002-2003, however, plans were shelved. Current plans, through to 2007, are now to be executed by the state-owned Egyptian Electricity Holding Company (EEHC), with concessionary funding provided by multilateral and bilateral agencies. Although capacity charges (in pound equivalency) have doubled, the power purchase agreements (PPAs) signed with each of the IPPs have held. Furthermore, a new regulatory body has had no impact on the existing contracts. While the original developers have sold their equity stake, new firms, with an increased appetite for risk, are stepping in to take their place. Meanwhile Egypt's liquefied natural gas (LNG) industry has developed over night; in just 2 years the country has become the world's sixth largest exporter, which raises questions about the long-term sustainability of gas-fired plants. (author)

  7. Milton Friedman: "TECHNOS" Interview.

    Science.gov (United States)

    TECHNOS, 1996

    1996-01-01

    This interview with Milton Friedman addresses his economic policies and how they might improve American public education. Highlights include teachers' unions and their negative impact on education, private schools and tax relief, the Edison Project, privatization of educational services, special needs students, California's Educational Freedom…

  8. Chemical Technology Division progress report, April 1, 1983-March 31, 1985

    International Nuclear Information System (INIS)

    1985-10-01

    The status of the following programs is reported: fission energy; nuclear and chemical waste management; environmental control technology; basic science and technology; biotechnology programs; transuranium-element processing; Nuclear Regulatory Commission programs; Consolidated Edison Uranium Solidification Project; radioactive materials production; computer 1 engineering applications; and miscellanous programs

  9. 77 FR 59165 - Notice of Intent To Prepare a Joint Supplemental Environmental Impact Statement/Environmental...

    Science.gov (United States)

    2012-09-26

    ... Renewable Transmission Project (TRTP). The CPUC granted Southern California Edison (SCE) approval to build... . Responsible Official: The responsible official is Thomas Contreras, Forest Supervisor, Angeles National Forest.... Thomas A. Contreras, Forest Supervisor. [FR Doc. 2012-23471 Filed 9-25-12; 8:45 am] BILLING CODE 3410-11...

  10. Chemical Technology Division progress report, April 1, 1983-March 31, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-10-01

    The status of the following programs is reported: fission energy; nuclear and chemical waste management; environmental control technology; basic science and technology; biotechnology programs; transuranium-element processing; Nuclear Regulatory Commission programs; Consolidated Edison Uranium Solidification Project; radioactive materials production; computer 1 engineering applications; and miscellanous programs.

  11. Reviews Book: Marie Curie: A Biography Book: Fast Car Physics Book: Beautiful Invisible Equipment: Fun Fly Stick Science Kit Book: Quantum Theory Cannot Hurt You Book: Chaos: The Science of Predictable Random Motion Book: Seven Wonders of the Universe Book: Special Relativity Equipment: LabVIEWTM 2009 Education Edition Places to Visit: Edison and Ford Winter Estates Places to Visit: The Computer History Museum Web Watch

    Science.gov (United States)

    2011-07-01

    WE RECOMMEND Fun Fly Stick Science Kit Fun fly stick introduces electrostatics to youngsters Special Relativity Text makes a useful addition to the study of relativity as an undergraduate LabVIEWTM 2009 Education Edition LabVIEW sets industry standard for gathering and analysing data, signal processing, instrumentation design and control, and automation and robotics Edison and Ford Winter Estates Thomas Edison's home is open to the public The Computer History Museum Take a walk through technology history at this computer museum WORTH A LOOK Fast Car Physics Book races through physics Beautiful Invisible The main subject of this book is theoretical physics Quantum Theory Cannot Hurt You A guide to physics on the large and small scale Chaos: The Science of Predictable Random Motion Book explores the mathematics behind chaotic behaviour Seven Wonders of the Universe A textual trip through the wonderful universe HANDLE WITH CARE Marie Curie: A Biography Book fails to capture Curie's science WEB WATCH Web clips to liven up science lessons

  12. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  13. 77 FR 24646 - Open Access and Priority Rights on Interconnection Facilities

    Science.gov (United States)

    2012-04-25

    ...., Washington, DC 20426, (202) 502-8868. Christopher Thomas (Technical Information), Office of Energy Market....g., First Wind at 6-7. \\32\\ See, e.g., First Wind at 6-7; AWEA at 11; Edison Mission at 25; and Next...- constrained renewable generation.\\37\\ \\36\\ Puget at 8; Edison Mission at 17. \\37\\ Edison Mission at 19. 16...

  14. Water hammer simulator

    International Nuclear Information System (INIS)

    Sinha, S.K.; Madia, J.; Dixon, S.

    1995-01-01

    The Consolidated Edison Company of New York, Inc. (Con Edison) has constructed a first-of-a-kind water hammer events simulator for use at its training center. The Learning Center, Con Edison's central training facility, intends to use the simulator as an educational tool to demonstrate the various mechanisms of the water hammer phenomenon to power plant designers, engineers and operators. The water hammer phenomenon has been studied extensively for the past 15 years for the nuclear industry. However, the acknowledge of the various water hammer mechanisms and the measures to prevent or mitigate water hammer have not been widely disseminated among the operators of fossil-fueled power plants. Con Edison personnel who operate the various generation stations and the New York City steam distribution systems are expected to benefit from the new simulator. Knowledge gained from interacting with the simulator will be very important in helping the Con Edison prevent, mitigate, or accommodate water hammer at its facilities. The water hammer simulator was fabricated in Con Edison's central machine shop. Details of the design and construction of the simulator were finalized in consultation with Creare, Inc., an engineering research firm, located in Hanover, New Hampshire. The simulator seeks to recreate the essential features of water hammer in steam mines following the buildup of cold (subcooled) water by condensation and steam-water interaction. This paper describes the fabrication, design, testing, and operation of the Con Edison water hammer simulator. A discussion of how Con Edison plans to use the facility at The Learning Center is included

  15. Demonstration of natural gas reburn for NO{sub x} emissions reduction at Ohio Edison Company`s cyclone-fired Niles Plant Unit Number 1

    Energy Technology Data Exchange (ETDEWEB)

    Borio, R.W.; Lewis, R.D.; Koucky, R.W. [ABB Power Plant Labs., Windsor, CT (United States); Lookman, A.A. [Energy Systems Associates, Pittsburgh, PA (United States); Manos, M.G.; Corfman, D.W.; Waddingham, A.L. [Ohio Edison, Akron, OH (United States); Johnson, S.A. [Quinapoxet Engineering Solutions, Inc., Windham, NH (United States)

    1996-04-01

    Electric utility power plants account for about one-third of the NO{sub x} and two-thirds of the SO{sub 2} emissions in the US cyclone-fired boilers, while representing about 9% of the US coal-fired generating capacity, emit about 14% of the NO{sub x} produced by coal-fired utility boilers. Given this background, the Environmental Protection Agency, the Gas Research Institute, the Electric Power Research Institute, the Pittsburgh Energy Technology Center, and the Ohio Coal Development Office sponsored a program led by ABB Combustion Engineering, Inc. (ABB-CE) to demonstrate reburning on a cyclone-fired boiler. Ohio Edison provided Unit No. 1 at their Niles Station for the reburn demonstration along with financial assistance. The Niles Unit No. 1 reburn system was started up in September 1990. This reburn program was the first full-scale reburn system demonstration in the US. This report describes work performed during the program. The work included a review of reburn technology, aerodynamic flow model testing of reburn system design concepts, design and construction of the reburn system, parametric performance testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of the Niles No. 1 host unit, a discussion of conclusions and recommendations derived from the program, tabulation of data from parametric and long-term tests, and appendices which contain additional tabulated test results.

  16. Budget performance reporting and construction work packaging

    International Nuclear Information System (INIS)

    Strong, M.G.; Weyers, L.L.

    1976-01-01

    A changing financial, technological, and regulatory environment has increased the complexity, costliness, and risk involved in constructing new generating facilities. A primary challenge facing utility executives is to hold down costs on these construction projects. New construction management techniques are required to accomplish this. Commonwealth Edison has responded by implementing a new Budget Performance Reporting System and a Construction Work Packaging System. The new systems are being used successfully on four major construction projects with budgets totaling over $4 billion

  17. Cleveland, Toledo utilities merge to aid N-projects

    International Nuclear Information System (INIS)

    Utroska, D.

    1985-01-01

    A decision by the Cleveland Electric Illuminating Co. and Toledo Edison to merge was spurred by the need to strengthen their access to capital markets in order to complete several nuclear power plants now under construction and to possibly mitigate the impact of large rate increases on Ohio ratepayers. The two utilities will continue as local companies. If they obtain approval from the Securities and Exchange, the Ohio Public Utilities, and the Nuclear Regulatory Commissions for the $8 million affiliation, the new holding company will be among the 20 largest electric utilities in terms of the market value of its common stock. Some industry observers see this as a harbinger of more utility mergers. 1 figure

  18. Cyber-intrusion Auto-response and Policy Management System (CAPMS)

    Energy Technology Data Exchange (ETDEWEB)

    Lusk, Steve [ViaSat Inc., Boston, MA (United States); Lawrence, David [Duke Energy, Charlotte, NC (United States); Suvana, Prakash [Southern California Edison, Rosemead, CA (United States)

    2015-11-11

    The Cyber-intrusion Auto-response and Policy Management System (CAPMS) project was funded by a grant from the US Department of Energy (DOE) Cybersecurity for Energy Delivery Systems (CEDS) program with contributions from two partner electric utilities: Southern California Edison (SCE) and Duke Energy. The goal of the project was to demonstrate protecting smart grid assets from a cyber attack in a way that “does not impede critical energy delivery functions.” This report summarizes project goals and activities for the CAPMS project and explores what did and did not work as expected. It concludes with an assessment of possible benefits and value of the system for the future.

  19. Demand Response Spinning Reserve Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Nelson-Hoffman, Janine; Torres, Carlos; Hirth,Scott; Yinger, Bob; Kueck, John; Kirby, Brendan; Bernier, Clark; Wright,Roger; Barat, A.; Watson, David S.

    2007-05-01

    The Demand Response Spinning Reserve project is a pioneeringdemonstration of how existing utility load-management assets can providean important electricity system reliability resource known as spinningreserve. Using aggregated demand-side resources to provide spinningreserve will give grid operators at the California Independent SystemOperator (CAISO) and Southern California Edison (SCE) a powerful, newtool to improve system reliability, prevent rolling blackouts, and lowersystem operating costs.

  20. Nuclear Regulatory Commission Issuances, September 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Commonwealth Edison Company (Dresden Nuclear Power Station, Unit 1), Consolidated Edison Company of New York (Indian Point, Unit 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Power Authority of the State of New York (Indian Point, Unit 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2); Issuances of Atomic Safety and Licensing Appeal Boards--Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Philadelphia Electric Company, et al. (Peach Bottom Atomic Power Statin, Units 2 and 3), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Statin, Unit No. 2), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3); Issuances of the Atomic Safety Licensing Boards--Cleveland Electric Illuminating Company, et al. (Perry Nuclear Power Plant, Units 1 and 2), Commonwealth Edison Company (Dresden Station, Units 2 and 3), Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Southern California Edison Company, et al. (San Onofre Nuclear Generating Station, Units 2 and 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2), Texas Utilities Generating Company, et al

  1. Evaluation of examination techniques for ferritic stainless steel feedwater heater tubing

    International Nuclear Information System (INIS)

    Nugent, M.J.; Catapano, M.C.

    1995-01-01

    Ferritic stainless steel has been finding increased application in utility plant feedwater heaters due to good strength and corrosion resistance and absence of potential copper contamination of feedwater system. Ferritic stainless steel is highly magnetic and is generally not inspectable using conventional eddy current testing techniques. A variety of techniques have been developed for inspection of this tubing material used in typical heat exchanger applications. Through a project funded by the Empire State Electric Energy Research Corporation (ESEERCO), the evaluation of data generated by four present state of the art NDE testing techniques were evaluated on a controlled mock-up of the heater tubing with service related defects. The primary objective was to determine the strengths and limitations of each method. The testing of two in service feedwater heaters at the Consolidated Edison Company of New York, Inc. (Con Edison's) Arthur Kill Generating Station also allowed further evaluations based on actual field conditions

  2. Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2013-01-31

    The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233 (233U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233U waste stream requires a special analysis because the concentrations of thorium-229 (229Th), 230Th, 232U, 233U, and 234U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of

  3. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  4. Long-term Metal Performance of Three Permeable Pavements

    Science.gov (United States)

    EPA constructed a 4,000-m2 parking lot surfaced with three permeable pavements (permeable interlocking concrete pavers, pervious concrete, and porous asphalt) on the Edison Environmental Center in Edison, NJ in 2009. Samples from each permeable pavement infiltrate were collected...

  5. Correlation of Water Quality Parameters with Metal Concentrations in Permeable Pavement Infiltrate

    Science.gov (United States)

    EPA constructed a 4,000-m2 parking lot for research and demonstration of three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)] at the Edison Environmental Center in Edison, NJ in 2009. Infiltrate samples from e...

  6. Nitrogen Transformations in Three Types of Permeable Pavement

    Science.gov (United States)

    In 2009, USEPA constructed a 0.4-ha (1-ac) parking lot at the Edison Environmental Center in Edison, NJ, that incorporated three different permeable pavement types - permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA). The driving lanes...

  7. Correlation of Traditional Water Quality Parameters with Metal Concentrations in Permeable Pavement Infiltrate

    Science.gov (United States)

    EPA constructed a 4,000-m2 parking lot for research and demonstration of three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)] at the Edison Environmental Center in Edison, NJ in 2009. Infiltrate samples from e...

  8. High-Penetration PV Integration Handbook for Distribution Engineers

    Energy Technology Data Exchange (ETDEWEB)

    Seguin, Rich [Electrical Distribution Design, Blacksburg, VA (United States); Woyak, Jeremy [Electrical Distribution Design, Blacksburg, VA (United States); Costyk, David [Electrical Distribution Design, Blacksburg, VA (United States); Hambrick, Josh [Electrical Distribution Design, Blacksburg, VA (United States); Mather, Barry [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-01-01

    This handbook has been developed as part of a five-year research project which began in 2010. The National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed together to analyze the impacts of high-penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to leverage the experience that SCE and the project team would gain during the significant installation of 500 MW of commercial scale PV systems (1-5 MW typically) starting in 2010 and completing in 2015 within SCE’s service territory through a program approved by the California Public Utility Commission (CPUC).

  9. 76 FR 349 - Combined Notice of Filings #1

    Science.gov (United States)

    2011-01-04

    .... Applicants: Orange & Rockland Utilities, Inc., Consolidated Edison Energy, Inc., Consolidated Edison... Electric Utilities Corporation, PPL Great Works, LLC, PPL Maine, LLC, PPL Wallingford Energy LLC, PPL..., LLC, PPL Susquehanna, LLC, PPL New Jersey Solar, LLC, PPL New Jersey Biogas, LLC, PPL EnergyPlus, LLC...

  10. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  11. Development Block or Stimulant

    DEFF Research Database (Denmark)

    Howells, John; Ron D, Katznelson

    In this paper we examine over four hundred patents in the USPTO incandescent lamp patent-relevant categories to assess how Edison's basic 223, 898 patent influenced inventive activity in the field. We categorise patents as 'inventions around' claim 2 of Edison's patent when their claims clearly p...

  12. 75 FR 71114 - Combined Notice of Filings #1

    Science.gov (United States)

    2010-11-22

    ... Numbers: ER11-2060-000. Applicants: Edison Mission Marketing & Trading, Inc., Exelon Generation Company... Edison Mission Marketing & Trading, Inc., et. al. Filed Date: 11/09/2010. Accession Number: 20101109-5194....13(a)(2)(iii: Submission of Changes to Pricing Zone Rates--OMPA to be effective 7/26/2010. Filed Date...

  13. A Process for Predicting Manhole Events in Manhattan

    OpenAIRE

    Isaac, Delfina F.; Ierome, Steve; Dutta, Haimonti; Radeva, Axinia; Passonneau, Rebecca J.; Rudin, Cynthia

    2009-01-01

    We present a knowledge discovery and data mining process developed as part of the Columbia/Con Edison project on manhole event prediction. This process can assist with real-world prioritization problems that involve raw data in the form of noisy documents requiring significant amounts of pre-processing. The documents are linked to a set of instances to be ranked according to prediction criteria. In the case of manhole event prediction, which is a new application for machine learning, the goal...

  14. 78 FR 38389 - Proposed Modification to the Scopes of Recognition of Several NRTLs

    Science.gov (United States)

    2013-06-26

    ... Door Assemblies, Including Positive Pressure Testing of Side-Hinged and Pivoted Swinging Door... 4248-9 Fuseholders--Part 9: Class K. UL 4248-11 Fuseholders--Part 11: Type C (Edison Base) and Type S... 4248-9 Fuseholders--Part 9: Class K. UL 4248-11 Fuseholders--Part 11: Type C (Edison Base) and Type S...

  15. 45 CFR 650.19 - Electronic invention handling.

    Science.gov (United States)

    2010-10-01

    ... Report or a Final Invention Statement and Certification. (b) Questions on use of iEdison and requests for... 45 Public Welfare 3 2010-10-01 2010-10-01 false Electronic invention handling. 650.19 Section 650... PATENTS § 650.19 Electronic invention handling. (a) Grantees must use the iEdison Invention Information...

  16. 78 FR 70329 - Modification to the Scopes of Recognition of Several NRTLs; Final Determination

    Science.gov (United States)

    2013-11-25

    ... Assemblies, Including Positive Pressure Testing of Side-Hinged and Pivoted Swinging Door Assemblies. ANSI...--Part 11: Type C (Edison Base) and Type S Plug Fuse; UL 4248-12-- Fuseholders--Part 12: Class R; UL 4248... (Edison Base) and Type S Plug Fuse UL 4248-12 Fuseholders--Part 12: Class R UL 4248-15 Fuseholders--Part...

  17. The Human Voice and the Silent Cinema.

    Science.gov (United States)

    Berg, Charles M.

    This paper traces the history of motion pictures from Thomas Edison's vision in 1887 of an instrument that recorded body movements to the development of synchronized sound-motion films in the late 1920s. The first synchronized sound film was made and demonstrated by W. K. L. Dickson, an assistant to Edison, in 1889. The popular acceptance of…

  18. Thomas Alva Edison

    Indian Academy of Sciences (India)

    'Yankee' family known for its self reliance and self confidence, he rose to ... tycoon and a living legend. In 1913 he ... work and printing mechanisms and a variety of telegraph instru- ments. .... later added to the quality of life all over the world.

  19. Large-scale demonstration of reliability centered maintenance at two nuclear generating stations

    International Nuclear Information System (INIS)

    Gaertner, J.P.; Edgar, C.; Rodin, M.E.

    1989-01-01

    This paper reports that after successful single-system pilot applications of Reliability Centered Maintenance (RCM) at various utilities, EPRI with Rochester Gas and Electric and Southern California Edison is undertaking multiple-system applications of RCM at their respective nuclear plants. The objective is to demonstrate the feasibility and cost-effectiveness of large-scale RCM application. In addition, each utility has plant-specific objectives to improve maintenance and plant availability. Each project has selected a prioritized list of some 15-20 systems on which to perform RCM. Each project is employing somewhat different RCM analysis methods, both of which conform to a global RCM definition applicable to all EPRI RCM work to date. Each project has developed important insights for improving cost and value of future analyses. Both projects will have applied the RCM process, including implementation, on several plant systems by April 1989

  20. Multi-discipline Waste Acceptance Process at the Nevada National Security Site - 13573

    Energy Technology Data Exchange (ETDEWEB)

    Carilli, Jhon T. [US Department Of Energy, Nevada Site Office, P. O. Box 98518, Las Vegas, Nevada 89193-8518 (United States); Krenzien, Susan K. [Navarro-Intera, LLC, P. O. Box 98952, Las Vegas, Nevada 89193-8952 (United States)

    2013-07-01

    The Nevada National Security Site low-level radioactive waste disposal facility acceptance process requires multiple disciplines to ensure the protection of workers, the public, and the environment. These disciplines, which include waste acceptance, nuclear criticality, safety, permitting, operations, and performance assessment, combine into the overall waste acceptance process to assess low-level radioactive waste streams for disposal at the Area 5 Radioactive Waste Management Site. Four waste streams recently highlighted the integration of these disciplines: the Oak Ridge Radioisotope Thermoelectric Generators and Consolidated Edison Uranium Solidification Project material, West Valley Melter, and classified waste. (authors)

  1. Topics for application of expert systems for nuclear power plants

    International Nuclear Information System (INIS)

    Trovato, S.A.; Aydin, F.

    1992-01-01

    Expert systems are an innovative form of computer software which offer to enhance productivity and improve operations of nuclear power plants. A survey and assessment of opportunities for application of this technology at Consolidated Edison Company of New York, Inc.'s (Con Edison) Indian Point 2 nuclear power plant was conducted. Eleven topics for expert systems are discussed in this paper. 1 ref., 2 figs., 2 tabs

  2. Advanced technologies applied to work management

    International Nuclear Information System (INIS)

    Aldrich, L.R.

    1993-01-01

    Commonwealth Edison Company subscribes to the dose optimization principle and has implemented reasonable efforts to maintain exposures to radiation as far below dose limits as practical consistent with the state of technology, the economics of improvements in relation to the state of technology and the economics of improvements in relation to the benefits to the public health and safety. In an effort to lower collective exposures, Commonwealth Edison Company has focused on improving performance in four key areas which have proven to contribute to lower personnel exposures - Management Controls, Work practices, Source Term Reduction and Technological Advancements. This paper focuses on the advanced technologies that the Commonwealth Edison Company has employed in the areas of work planning, work performance and work monitoring to manage our occupational dose control

  3. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Science.gov (United States)

    2011-10-28

    ...-register to attend or present oral comments at the meetings by contacting Mr. Bruce Olson by telephone at 1... public meetings, the need should be brought to Mr. Bruce Olson's attention no later than December 8, 2011... FURTHER INFORMATION CONTACT: Mr. Bruce Olson, Project Manager, Environmental Projects Branch 2, Division...

  4. SOx-NOx-Rox Box{trademark} flue gas clean-up demonstration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The SNRB{trademark} Flue Gas Cleanup Demonstration Project was cooperatively funded by the U.S. Department of Energy (DOE), the Ohio Coal Development Office (OCDO), B&W, the Electric Power Research Institute (EPRI), Ohio Edison, Norton Chemical Process Products Company and the 3M Company. The SNRB{trademark} technology evolved from the bench and laboratory pilot scale to be successfully demonstrated at the 5-MWe field scale. Development of the SNRB{trademark} process at B&W began with pilot testing of high-temperature dry sorbent injection for SO{sub 2} removal in the 1960`s. Integration of NO{sub x} reduction was evaluated in the 1970`s. Pilot work in the 1980`s focused on evaluation of various NO{sub x} reduction catalysts, SO{sub 2} sorbents and integration of the catalyst with the baghouse. This early development work led to the issuance of two US process patents to B&W - No. 4,309,386 and No. 4,793,981. An additional patent application for improvements to the process is pending. The OCDO was instrumental in working with B&W to develop the process to the point where a larger scale demonstration of the technology was feasible. This report represents the completion of Milestone M14 as specified in the Work Plan. B&W tested the SNRB{trademark} pollution control system at a 5-MWe demonstration facility at Ohio Edison`s R. E. Burger Plant located near Shadyside, Ohio. The design and operation were influenced by the results from laboratory pilot testing at B&W`s Alliance Research Center. The intent was to demonstrate the commercial feasibility of the SNRB{trademark} process. The SNRB{trademark} facility treated a 30,000 ACFM flue gas slipstream from Boiler No. 8. Operation of the facility began in May 1992 and was completed in May 1993.

  5. Increase in the number of distributed power generation installations in electricity distribution grids - Literature; Zunahme der dezentralen Energieerzeugungsanlagen in elektrischen Verteilnetzen: Literatur

    Energy Technology Data Exchange (ETDEWEB)

    Gottsponer, O.; Mauchle, P.

    2003-07-01

    This is the tenth and last part of a final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This ninth appendix to the main report presents an overview and details of the literature and internet sources used in the project. Also, similar projects that discuss the problem area dealt with are briefly described. These include the Dispower, EDIson, DEMS, AMOEVES and ELSAD projects.

  6. OTTER: An Optimized Transit Tool And Easy Reference

    Science.gov (United States)

    2016-03-01

    TRANSIT TOOL AND EASY REFERENCE Warren Korban Blackburn Lieutenant Commander, United States Navy B.A., Thomas Edison State College, 2003...B.S.A.S.T., Thomas Edison State College, 2004 Submitted in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE IN...application. Each of these technologies adds to the efficiency of the fleet. As RADM Thomas Eccles said, “No single technology will enable the Navy to

  7. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Science.gov (United States)

    2011-12-14

    ... Information Contact: Mr. Bruce Olson, Project manager, Environmental Projects Branch 2, Division of New.... Telephone: (301) 415-3731; email: Bruce.Olson@nrc.gov . Dated at Rockville, Maryland, this 7th day of...

  8. Integrated control of next generation power system

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-02-28

    The multi-agent system (MAS) approach has been applied with promising results for enhancing an electric power distribution circuit, such as the Circuit of the Future as developed by Southern California Edison. These next generation power system results include better ability to reconfigure the circuit as well as the increased capability to improve the protection and enhance the reliability of the circuit. There were four main tasks in this project. The specific results for each of these four tasks and their related topics are presented in main sections of this report. Also, there were seven deliverables for this project. The main conclusions for these deliverables are summarized in the identified subtask section of this report. The specific details for each of these deliverables are included in the “Project Deliverables” section at the end of this Final Report.

  9. The ‘talking machine’ comes to the Dutch East Indies: The arrival of Western media technology in Southeast Asia

    Directory of Open Access Journals (Sweden)

    S. Suryadi

    2008-12-01

    Full Text Available The invention of sound recording technology in the nineteenth century was a modern miracle. Making possible the storage and preservation of sounds across time and distance, which previously could only be dreamed of, this invention contributed significantly to the developing entertainment world. Thomas Alva Edison first realized this dream in 1877 when he invented the tin-foil phonograph, which then inspired other scientists to perfect and develop his invention. During the last two decades of the 1800s sound recording machines were exhibited outside the United States of America, first in Europe and then in Australia and Asia. In Europe the machine was first demonstrated at the Academy of Science in Paris on 11 March 1878, where a French professor named Bonjour accused Edison of cheating. He stated that Edison was a ventriloquist.

  10. Spray polyurea coatings as containment liners in coal slurry storage ponds

    Energy Technology Data Exchange (ETDEWEB)

    Darden, J.W.; Loomis, R.; Roehm, F.T. [Willamette Valley Co., Eugene, OR (United States)

    1996-12-31

    The Southern California Edison (SCE) Mohave Generating Station was built in the early 1970`s in response to the shortage of oil due to the OPEC boycott. Coal/water slurry from the Black Mesa Pipeline is used to generate energy at the plant. Eight storage ponds, each about 175,000 square feet, were built in the mid to late 1970`s to insure a constant supply of slurry to feed the generating units. This paper describes the application of POLYQuik{trademark} P400 spray polyurea coating to the Marcona Pond, a coal slurry storage area at Southern California Edison`s Mohave Generating Station. The coating forms an impermeable barrier to prevent water loss and contamination of subgrade soils. The use of these coatings reduces facility downtime and liner replacement costs, offering a cost savings over the life of the pond.

  11. Environment-Induced Cracking of Metals, Proceedings of the International Conference (1st), Held in Kohler, Wisconsin on October 2-7, 1988

    Science.gov (United States)

    1990-01-01

    extracted phases in a Vacuum Gene - A summary of the results of the microstructura characterization atorst HB 5 scanning transmission electron... Fanc , 187) p.22.press. (France: Electricite de France, 1987), p. 22. 1188. S.M. Bruemmer, L.A. Charlot, C.H. Henager Jr., "Microstruc- 147. C.D...student. 26. B. Cox, Stress Corrosion Cracking, ed. J. Yahalom, A. Aladjem Later, Gene Bailey of Commonwealth Edison and the Edison Electric (Tel-Aviv

  12. Design/Construction of a Permeable Pavement Demonstration Site at the Edison Environmental Center (EEC)

    Science.gov (United States)

    This project will provide a scientifically defensible estimate of the performance of the three permeable surfaces: porous concrete, porous asphalt, and interlocking concrete pavers. The U.S. Environmental Protection Agency (EPA) can provide the results to municipalities enabling...

  13. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    Science.gov (United States)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  14. A structured approach to individual plant evaluation and accident management

    International Nuclear Information System (INIS)

    Klopp, G.T.

    1992-01-01

    The need for long term development of accident management programs is acknowledged and the key tool for that development is identified as the IPE Program. The Edison commitment to build an integrated program is cited and the effect on the IPE effort is considered. Edison's integrated program is discussed in detail. The key benefits, realism and long term savings, are discussed. Some of the highly visible products such as neural network artificial intelligence systems are cited

  15. Permeable pavement study (Edison)

    Data.gov (United States)

    U.S. Environmental Protection Agency — While permeable pavement is increasingly being used to control stormwater runoff, field-based, side-by-side investigations on the effects different pavement types...

  16. Reactor Emergency Action Level Monitor: Knowledge acquisition experiences

    International Nuclear Information System (INIS)

    Touchton, R.A.

    1987-01-01

    This paper presents the Knowledge Acquisition experiences in developing the Reactor Emergency Action Level Monitor (REALM) Expert System Prototype. REALM is an expert system which interprets plant sensor data and provides advice on the proper emergency classification. The REALM project is being funded by the Electric Power Research Institute, Consolidated Edison is serving as the host utility, and the effort is being conducted by Technology Applications, Inc. REALM is being designed to provide expert assistance in the identification of a nuclear power plant emergency situation and the determination of its severity, ultimately operating in a real-time, on-line processing environment. The paper discusses briefly the direct knowledge acquisition techniques used by the project team (who are themselves power industry engineers), to extract relevant knowledge from plant specifications and procedures

  17. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States); Hill, L.J. [Oak Ridge National Lab., TN (United States)

    1995-11-01

    This document contains summaries of the electric utilities performance-based rate plans for the following companies: Alabama Power Company; Central Maine Power Company; Consolidated Edison of New York; Mississippi Power Company; New York State Electric and Gas Corporation; Niagara Mohawk Power Corporation; PacifiCorp; Pacific Gas and Electric; Southern California Edison; San Diego Gas & Electric; and Tucson Electric Power. In addition, this document also contains information about LBNL`s Power Index and Incentive Properties of a Hybrid Cap and Long-Run Demand Elasticity.

  18. 77 FR 5787 - Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing...

    Science.gov (United States)

    2012-02-06

    ... Request: The licensee proposes to upgrade and overhaul all six pump-turbine/motor generating units of the... increase the authorized installed and hydraulic capacities of the project from 1,657.5 MW to 1,785 MW and...

  19. Staffing, qualification and organization for centralized and decentralized training

    International Nuclear Information System (INIS)

    Holyoak, R.H.

    1985-01-01

    This paper covers an extensive area. First a brief history of the training at Commonwealth Edison is presented so that the reader can get some idea of why some of the problems mentioned exist. Next is a discussion of the centralized and decentralized Commonwealth Edison production training organization. A brief review of the development of the Instructor Qualification Program and the training of instructors follows. Finally, a review of the problems and some solutions related to managing a centralized/decentralized training system is included

  20. District heating and cooling systems for communities through power-plant retrofit and distribution network. Volume 2. Tasks 1-3. Final report. [Downtown Toledo steam system

    Energy Technology Data Exchange (ETDEWEB)

    Watt, J.R.; Sommerfield, G.A.

    1979-08-01

    Each of the tasks is described separately: Task 1 - Demonstration Team; Task 2 - Identify Thermal Energy Source(s) and Potential Service Area(s); and Task 3 - Energy Market Analysis. The purpose of the project is to establish and implement measures in the downtown Toledo steam system for conserving scarce fuel supplies through cogeneration, by retrofit of existing base- or intermediate-loaded electric-generating plants to provide for central heating and cooling systems, with the ultimate purpose of applying the results to other communities. For Task 1, Toledo Edison Company has organized a Demonstration Team (Battelle Columbus Laboratories; Stone and Webster; Ohio Dept. of Energy; Public Utilities Commission of Ohio; Toledo Metropolitan Area Council of Governments; and Toledo Edison) that it hopes has the expertise to evaluate the technical, legal, economic, and marketing issues related to the utilization of by-product heat from power generation to supply district heating and cooling services. Task 2 gives a complete technical description of the candidate plant(s), its thermodynamic cycle, role in load dispatch, ownership, and location. It is concluded that the Toledo steam distribution system can be the starting point for developing a new district-heating system to serve an expanding market. Battelle is a member of the team employed as a subcontractor to complete the energy market analysis. The work is summarized in Task 3. (MCW)

  1. Plant Reliability - an Integrated System for Management (PR-ISM)

    International Nuclear Information System (INIS)

    Aukeman, M.C.; Leininger, E.G.; Carr, P.

    1984-01-01

    The Toledo Edison Company, located in Toledo, Ohio, United States of America, recently implemented a comprehensive maintenance management information system for the Davis-Besse Nuclear Power Station. The system is called PR-ISM, meaning Plant Reliability - An Integrated System for Management. PR-ISM provides the tools needed by station management to effectively plan and control maintenance and other plant activities. The PR-ISM system as it exists today consists of four integrated computer applications: equipment data base maintenance, maintenance work order control, administrative activity tracking, and technical specification compliance. PR-ISM is designed as an integrated on-line system and incorporates strong human factors features. PR-ISM provides each responsible person information to do his job on a daily basis and to look ahead towards future events. It goes beyond 'after the fact' reporting. In this respect, PR-ISM is an 'interactive' control system which: captures work requirements and commitments as they are identified, provides accurate and up-to-date status immediately to those who need it, simplifies paperwork and reduces the associated time delays, provides the information base for work management and reliability analysis, and improves productivity by replacing clerical tasks and consolidating maintenance activities. The functional and technical features of PR-ISM, the experience of Toledo Edison during the first year of operation, and the factors which led to the success of the development project are highlighted. (author)

  2. Electric vehicles in Danish power system with large penetration of wind power

    DEFF Research Database (Denmark)

    Yang, Lihui; Xu, Zhao; Østergaard, Jacob

    2011-01-01

    Electric vehicles (EVs) provide a unique opportunity for reducing the CO2 emissions from the transport sector. At the same time, EVs have the potential to play an important role in the economical and reliable operation of an electricity system with high penetration of renewable energy. An analysi......). The managing structure of V2G adopting virtual power plant (VPP) technology is proposed. © 2011 State Grid Electric Power Research Institute Press....... is made of the potential for using EVs in Denmark, and the benefits of the electric power system with high wind power generation by intelligent charging and discharging of EVs are enumerated. Based on the analysis, important technological gaps are identified, and the corresponding research and development...... initiatives of the recently established EDISON program are described. Moreover, the latest development of the EDISON program is treated, that is, EDISON as a research consortium to design a new model for the Danish power system with high penetration of wind power and EVs with vehicle to grid (V2G...

  3. A mutation in Nischarin causes otitis media via LIMK1 and NF-κB pathways.

    Directory of Open Access Journals (Sweden)

    Michael Crompton

    2017-08-01

    Full Text Available Otitis media (OM, inflammation of the middle ear (ME, is a common cause of conductive hearing impairment. Despite the importance of the disease, the aetiology of chronic and recurrent forms of middle ear inflammatory disease remains poorly understood. Studies of the human population suggest that there is a significant genetic component predisposing to the development of chronic OM, although the underlying genes are largely unknown. Using N-ethyl-N-nitrosourea mutagenesis we identified a recessive mouse mutant, edison, that spontaneously develops a conductive hearing loss due to chronic OM. The causal mutation was identified as a missense change, L972P, in the Nischarin (NISCH gene. edison mice develop a serous or granulocytic effusion, increasingly macrophage and neutrophil rich with age, along with a thickened, inflamed mucoperiosteum. We also identified a second hypomorphic allele, V33A, with only modest increases in auditory thresholds and reduced incidence of OM. NISCH interacts with several proteins, including ITGA5 that is thought to have a role in modulating VEGF-induced angiogenesis and vascularization. We identified a significant genetic interaction between Nisch and Itga5; mice heterozygous for Itga5-null and homozygous for edison mutations display a significantly increased penetrance and severity of chronic OM. In order to understand the pathological mechanisms underlying the OM phenotype, we studied interacting partners to NISCH along with downstream signalling molecules in the middle ear epithelia of edison mouse. Our analysis implicates PAK1 and RAC1, and downstream signalling in LIMK1 and NF-κB pathways in the development of chronic OM.

  4. Remotely operated facility for in situ solidification of fissile uranium

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Collins, E.D.; Patton, B.D.

    1986-01-01

    A heavily shielded, remotely operated facility, located within the Radiochemical processing Plant at Oak Ridge National Laboratory (ORNL), has been designed and is being operated to convert approx.1000 kg of fissile uranium (containing approx.75% 235 U, approx.10% 233 U, and approx.140 ppM 232 U) from a nitrate solution (130 g of uranium per L) to a solid oxide form. This project, the Consolidated Edison Uranium Solidification Program (CEUSP), is being carried out in order to prepare a stable uranium form for longterm storage. This paper describes the solidification process selected, the equipment and facilities required, the experimental work performed to ensure successful operation, some problems that were solved, and the initial operations

  5. Non-process instrumentation surveillance and test reduction

    International Nuclear Information System (INIS)

    Ferrell, R.; LeDonne, V.; Donat, T.; Thomson, I.; Sarlitto, M.

    1993-12-01

    Analysis of operating experience, instrument failure modes, and degraded instrument performance has led to a reduction in Technical Specification surveillance and test requirements for nuclear power plant process instrumentation. These changes have resulted in lower plant operations and maintenance (O ampersand M) labor costs. This report explores the possibility of realizing similar savings by reducing requirements for non-process instrumentation. The project team reviewed generic Technical Specifications for the four major US nuclear steam supply system (NSSS) vendors (Westinghouse, General Electric, Combustion Engineering, and Babcock ampersand Wilcox) to identify nonprocess instrumentation for which surveillance/test requirements could be reduced. The team surveyed 10 utilities to identify specific non-process instrumentation at their plants for which requirements could be reduced. The team evaluated utility analytic approaches used to justify changes in surveillance/test requirements for process equipment to determine their applicability to non-process instrumentation. The report presents a prioritized list of non-process instrumentation systems suitable for surveillance/test requirements reduction. The top three systems in the list are vibration monitors, leak detection monitors, and chemistry monitors. In general, most non-process instrumentation governed by Technical Specification requirements are candidates for requirements reduction. If statistical requirements are somewhat relaxed, the analytic approaches previously used to reduce requirements for process instrumentation can be applied to non-process instrumentation. The report identifies as viable the technical approaches developed and successfully used by Southern California Edison, Arizona Public Service, and Boston Edison

  6. Physics in WWI: Fighting the Acoustic War

    Science.gov (United States)

    Kevles, Daniel

    2015-01-01

    World War I was the first high-technology war, and when the United States began to prepare for it in 1915 the federal government turned to the storied inventor Thomas Edison. Edison formed a board that included industrial executives and engineers but only one physicist, its members holding that they wanted people who would do things and not just talk about them. However, in 1916, the nation's scientists managed to create a place for themselves in the preparedness effort by organizing the National Research Council under the National Academy of Sciences. Once the United States went to war, in April 1917, the NRC brought academic and industrial physicists together in efforts to detect incoming aircraft, submerged submarines, and the location of long-range artillery. The efforts employed devices that relied in the main on the detection and identification of sound waves from these weapons. The devices were passive responders, but they were marked by increasing sophistication and enabled the United States and its allies to prosecute an acoustic war. That branch of the war was militarily effective, overshadowed the work of Edison's group, and gained physicists high standing among leaders in both the military and industry.

  7. Technical evaluation of the susceptibility of safety-related systems to flooding caused by the failure of non-category 1 systems for the San Onofre Nuclear Power Plant, Unit 1

    International Nuclear Information System (INIS)

    Latorre, V.R.; Victor, R.A.

    1980-11-01

    This report documents the technical evaluation of Southern California Edison Company's San Onofre Nuclear Power Plant, Unit 1, to determine whether the failure of any non-Category 1 (seismic) equipment could result in a condition, such as flooding, that might potentially adversely affect the performance of safety-related equipment required for the safe shutdown of the facility or to mitigate the consequences of an accident. Criteria developed by the US Nuclear Regulatory Commission were used to evaluate the acceptability of the existing protection as well as measures taken by Southern California Edison Company to minimize the danger of flooding and to protect safety-related equipment

  8. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  9. Through the looking glass and back again: the PANE case, a rebuttal

    International Nuclear Information System (INIS)

    Bauser, D.B.

    1985-01-01

    The Supreme Court rejected the proposition that a federal agency is required to assess the psychological health aspects of a federal project in Metropolitan Edison Co. v. People Against Nuclear Energy (PANE). The author challenges an earlier article by W. Jordan when he finds that the PANE decision establishes that the National Environmental Policy Act (NEPA) does not require this kind of assessment. After reviewing the PANE case, he concludes that Jordan was incorrect in suggesting that the Court's decision was narrow in scope and that psychological distress would be a cognizable environmental impact under NEPA in many cases. The author agrees that psychological harm may well affect the quality of modern life, but it is not within the scope of NEPA

  10. Microorganism Removal in Permeable Pavement Parking Lots ...

    Science.gov (United States)

    Three types of permeable pavements (pervious concrete, permeable interlocking concrete pavers, and porous asphalt) were monitored at the Edison Environmental Center in Edison, New Jersey for indicator organisms such as fecal coliform, enterococci, and E. coli. Results showed that porous asphalt had much lower concentration in monitored infiltrate compared to pervious concrete and permeable interlocking concrete pavers. Concentrations of monitored organisms in infiltrate from porous asphalt were consistently below the bathing water quality standard. Fecal coliform and enterococci exceeded bathing water quality standards more than 72% and 34% of the time for permeable interlocking concrete pavers and pervious concrete, respectively. Purpose is to evaluate the performance of permeable pavement in removing indicator organisms from infiltrating stormwater runoff.

  11. 75 FR 54390 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-09-07

    ... consideration. Attorney for licensee: Douglas K. Porter, Esquire, Southern California Edison Company, 2244 Walnut Grove Avenue, Rosemead, California 91770. NRC Branch Chief: Michael T. Markley. Virginia Electric...

  12. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  13. Solution to valve failures at Braidwood induced by service water cavitation

    International Nuclear Information System (INIS)

    Ozol, J.; Schipiour, B.K.; Wix, J.E.

    1994-01-01

    Control valves throttle fluid from a high pressure to a lower pressure. On water systems, this throttling process may be accompanied by cavitation, which induces valve noise, vibration, and material damage. Extensive and significant caviation erosion has been experienced the last 10 years in most service water control valve bodies, downstream flanges, and reducers at Braidwood Station. There have been 40 different and distinct cavitation-induced failures in the service water system at Braidwood Station. These failures have created significant costs and continue to be a lingering source of operational maintenance costs to the Commonwealth Edison Company, which is incurring significant financial losses. It should be noted that almost all service water control valves experience some cavitation effects. Cavitation and cavitation damage are complex and elusive phenomena for which no single, simple analytical model exists. The purpose of this paper is to explain features of service water control valve cavitation failures and some of the solutions used by Commonwealth Edison at their six nuclear stations. The paper discusses the following: (1) Braidwood's history of erosion from cavitation; (2) Erosion-corrosion considerations; (3) The Instrument Society of America's valve sizing equations and how they relate to cavitation; (4) Methods to eliminate cavitation; (5) Corrective actions and practical approaches used by Commonwealth Edison to eliminate cavitation

  14. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  15. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  16. 77 FR 28880 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-05-16

    ... (NVO & OFF), 332 Hindry Avenue, Inglewood, CA 90301, Officers: Edison Chen, Manager (Qualifying..., Schiller Park, IL 60176, Officers: Scott A. Case, Vice President (Qualifying Individual), Thomas C. Case...

  17. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  18. Southern California Edison Grid Integration Evaluation: Cooperative Research and Development Final Report, CRADA Number CRD-10-376

    Energy Technology Data Exchange (ETDEWEB)

    Mather, Barry [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-07-09

    The objective of this project is to use field verification to improve DOE’s ability to model and understand the impacts of, as well as develop solutions for, high penetration PV deployments in electrical utility distribution systems. The Participant will work with NREL to assess the existing distribution system at SCE facilities and assess adding additional PV systems into the electric power system.

  19. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  20. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  1. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  2. PC based temporary shielding administrative procedure (TSAP)

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, D.E.; Pederson, G.E. [Sargent & Lundy, Chicago, IL (United States); Hamby, P.N. [Commonwealth Edison Co., Downers Grove, IL (United States)

    1995-03-01

    A completely new Administrative Procedure for temporary shielding was developed for use at Commonwealth Edison`s six nuclear stations. This procedure promotes the use of shielding, and addresses industry requirements for the use and control of temporary shielding. The importance of an effective procedure has increased since more temporary shielding is being used as ALARA goals become more ambitious. To help implement the administrative procedure, a personal computer software program was written to incorporate the procedural requirements. This software incorporates the useability of a Windows graphical user interface with extensive help and database features. This combination of a comprehensive administrative procedure and user friendly software promotes the effective use and management of temporary shielding while ensuring that industry requirements are met.

  3. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  4. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. 77 FR 21760 - Combined Notice of Filings #2

    Science.gov (United States)

    2012-04-11

    ... Numbers: ER12-1439-000. Applicants: PJM Interconnection, L.L.C. Description: First Revised Service... California Edison Company. Description: Amended SGIA SERV AG SCE-TDBU SCE-GPS 2501WSanBernardino Redlands...

  6. Midwest nukes tumble, rock industry: Byron, Marble Hill, Zimmer

    International Nuclear Information System (INIS)

    Nogee, A.

    1984-01-01

    The nuclear industry is suffering from a lack of investor confidence because of cancelled projects and the unprecedented rejection of an operating license for Commonwealth Edison's Byron plant on grounds that the utility failed to meet quality assurance responsibilities. When plans to complete the Zimmer and Marble Hill nuclear plants were abandoned, Bechtel came forward with a financing plan that, while rejected for Zimmer and Marble Hill, could lead to future bailouts. Both Zimmer and Marble Hill plants could be partially converted to coal. The loss of investor confidence in nuclear plants is largely due to political pressures brought on by a combination of citizen intervenors, whistle blowers on construction sites and disagreements between participating utilities. A rise in stock prices followed the cancellation announcements and the lowered investment security ratings

  7. Uranium supply in the United States: a current assessment

    International Nuclear Information System (INIS)

    Hogerton, J.F.

    1976-01-01

    Not long ago the availability of uranium was taken for granted by utilities planning nuclear power projects. Today it is difficult to find a utility with nuclear commitments that is not concerned about some aspect of uranium supply. Some are concerned about lack of coverage for near-term or even close-in requirements. Others are concerned about resources for the long-haul. All are concerned about what has been happening in the marketplace and are wondering what to expect in the future. Each of these three aspects of uranium supply are examined from the U.S. standpoint. The remarks reflect the findings of a study from the S. M. Stoller Corporation, carried out recently for the Edison Electric Institute and other utility sponsors, the report on which was released on March 31, 1976

  8. Costs and Benefits of Using Fuel Cells for Stationary Power Generation at Marine Corps Logistics Base Barstow Maintenance Center

    National Research Council Canada - National Science Library

    Schendler, Phillip

    2002-01-01

    We compare the costs and benefits of using two types of fuel cell power generation systems versus Southern California Edison to provide the base electricity load for the Marine Corps Logistics Base...

  9. 78 FR 71611 - Ocean Transportation Intermediary License Revocations and Terminations

    Science.gov (United States)

    2013-11-29

    .... Name: New York Logistic Services, Inc. Address: 1308 Merrywood Drive, Edison, NJ 08817. Date Revoked... maintain valid bonds. ;License No.: 022367N. Name: Blue Ocean Logistics Corporation dba B.O. Logistic Corp...

  10. 75 FR 47620 - Notice of Availability of the Final Environmental Impact Statement and Proposed Amendment to the...

    Science.gov (United States)

    2010-08-06

    ... Southern California Edison (SCE) Pisgah Substation; an administration building; a main services complex.... Authority: 40 CFR 1506.6 and 1506.10; and 43 CFR 1610.2. Thomas Pogacnik, Deputy State Director, Natural...

  11. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  12. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  13. 77 FR 16098 - In the Matter of All Operating Boiling Water Reactor Licensees With Mark I and Mark II...

    Science.gov (United States)

    2012-03-19

    .... Jack M. Davis Senior Vice President and Chief Nuclear Officer. Detroit Edison Company Fermi 2--210 NOC..., Inc Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Quad Cities Nuclear...

  14. Talking About Defense: Leathernecks in Lab Coats

    National Research Council Canada - National Science Library

    Wilson, George

    2002-01-01

    .... Anderson is not the typical bunker-charging, poster-boy Marine. An internationally known authority on new kinds of warfare, Anderson more resembles a militarized Thomas Edison, an experimenter in the science of war...

  15. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  16. 75 FR 17765 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Science.gov (United States)

    2010-04-07

    ... transmission line (which will connect to Southern California Edison's planned Red Bluff substation.... Authority: 40 CFR 1506.6 and 1506.10 and 43 CFR 1610.2 Thomas Pogacnik, Deputy State Director. [FR Doc. 2010...

  17. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  18. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  19. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2, (Docket Nos. 50-440 and 50-441)

    International Nuclear Information System (INIS)

    1984-02-01

    Supplement No. 4 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1, 2 and 3 to that report

  20. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2: Docket Nos. 50-440 and 50-441

    International Nuclear Information System (INIS)

    1983-01-01

    Supplement No. 2 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group (CAPCO)), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement No. 1 to that report

  1. Robot hunts sludge and hoses it away

    International Nuclear Information System (INIS)

    Trovato, S.A.

    1988-01-01

    Engineers are frustrated by the need to maintain equipment that tools can only reach with difficulty and that human hands cannot reach at all. Accessibility for inspection and maintenance is a frequently overlooked factor in the design of many types of equipment. Such is the case with pressurized-water-reactor (PWR) nuclear power plants that use steam generators. The steam generators form the boundary between the nuclear reactor coolant system and the secondary turbine cycle. Inspection and maintenance are hindered not only by inaccessibility but by radiation as well. To facilitate inspection and maintenance on the secondary side of these generators, Consolidated Edison of New York has collaborated in the development of a robot called Cecil - the Con Edison Combined Inspection and Lancing system. This article describe CECIL

  2. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2. Docket Nos. 50-440 and 50-441

    International Nuclear Information System (INIS)

    1983-04-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440/441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 and 2 to that report

  3. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  4. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  5. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  6. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  7. 75 FR 17762 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the Solar...

    Science.gov (United States)

    2010-04-07

    ... relocation of two Southern California Edison electrical transmission lines, construction of a new 5-mile long... guarantee that we will be able to do so. Thomas Pogacnik, Deputy State Director. Authority: 40 CFR 1506.6...

  8. 75 FR 30010 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Science.gov (United States)

    2010-05-28

    ..., Thomas[email protected] . Kimberly D. Bose, Secretary. Agenda for AD10-12 Staff Technical Conference on... Gribik and Li Zhang, Midwest ISO Gary Stern, Southern California Edison 9:25 a.m Session G--Variable...

  9. 78 FR 40497 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2013-07-05

    ... Southern California Edison substation at Substation Road. The power plant, access roads, well pads.... Thomas Pogacnik, Deputy State Director. [FR Doc. 2013-16128 Filed 7-3-13; 8:45 am] BILLING CODE 4310-40-P ...

  10. 75 FR 6057 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chevron...

    Science.gov (United States)

    2010-02-05

    ... connect it to an existing Southern California Edison 33 kV distribution system on public lands located...; 40 CFR 1506.10; 43 CFR 1610.2. Thomas Pogacnik, Deputy State Director, California. [FR Doc. 2010-2299...

  11. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  12. Alternatives to the 15% Rule

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, Robert Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Quiroz, Jimmy Edward [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Reno, Matthew J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Munoz-Ramos, Karina [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Smith, Jeff [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Rylander, Matthew [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Rogers, Lindsey [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Dugan, Roger [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Mather, Barry [National Renewable Energy Lab. (NREL), Golden, CO (United States); Coddington, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gotseff, Peter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ding, Fei [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    The third solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utility Commission (CPUC) is supporting the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with collaboration from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E), in research to improve the Utility Application Review and Approval process for interconnecting distributed energy resources to the distribution system. Currently this process is the most time - consuming of any step on the path to generating power on the distribution system. This CSI RD&D solicitation three project has completed the tasks of collecting data from the three utilities, clustering feeder characteristic data to attain representative feeders, detailed modeling of 16 representative feeders, analysis of PV impacts to those feeders, refinement of current screening processes, and validation of those suggested refinements. In this report each task is summarized to produce a final summary of all components of the overall project.

  13. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  14. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  15. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  16. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  17. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  18. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  19. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  2. In-field Welding and Coating Protocols

    Science.gov (United States)

    2009-05-12

    Gas Technology Institute (GTI) and Edison Welding Institute (EWI) created both laboratory and infield girth weld samples to evaluate the effects of weld geometry and hydrogen off-gassing on the performance of protective coatings. Laboratory made plat...

  3. R-ES-ONANCE--IOc-to-b-er

    Indian Academy of Sciences (India)

    to resolve whether DC or AC should be used for power supply. Thomas Alva ... storehouse of hydro electric energy. Edison ... was called. Alternating current is generated and consumed all ..... They have to be augmented and modernized ...

  4. iPod 10 aastane / Tõnu Ojala

    Index Scriptorium Estoniae

    Ojala, Tõnu, 1969-

    2011-01-01

    Oktoober ajaloos. 2001 - Apple tõi turule iPodi. 1976 - viperused Nõukogude kosmoselaevaga Sojuz-23. 1936 valmis Hooveri tamm. 1931 suri USA leidur Thomas Alva Edison. 1911 - Itaalia armee kasutas sõjas Türgi vastu esmakordselt lennukit

  5. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  6. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  7. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  8. Detection of semi-volatile organic compounds in permeable pavement infiltrate

    Science.gov (United States)

    Abstract The Edison Environmental Center (EEC) performs research on green infrastructure (GI) treatment options. One such treatment option is the use of permeable pavements. EEC constructed a parking lot comprised of three different permeable systems: permeable asphalt, porous ...

  9. Integrated Vegetation Management Practices Memorandum of Understanding

    Science.gov (United States)

    Memorandum of Understanding between EPA and the Edison Electric Institute, U.S. Department of Agriculture (Forest Service), and U.S. Department of the Interior (Bureau of Land Management, Fish and Wildlife Service, and National Park Service for IVM.

  10. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  11. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  12. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  13. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 7

    International Nuclear Information System (INIS)

    1985-11-01

    Supplement No. 7 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket No. 50-440 and 50-441) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 6 to that report

  14. Evaluating System Parameters on a Dragonfly using Simulation and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Bhatele, Abhinav [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jain, Nikhil [Univ. of Illinois, Urbana-Champaign, IL (United States); Livnat, Yarden [Univ. of Utah, Salt Lake City, UT (United States); Pascucci, Valerio [Univ. of Utah, Salt Lake City, UT (United States); Bremer, Peer-Timo [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Univ. of Utah, Salt Lake City, UT (United States)

    2015-04-24

    The dragon y topology is becoming a popular choice for build- ing high-radix, low-diameter networks with high-bandwidth links. Even with a powerful network, preliminary experi- ments on Edison at NERSC have shown that for communica- tion heavy applications, job interference and thus presumably job placement remains an important factor. In this paper, we explore the e ects of job placement, job sizes, parallel workloads and network con gurations on network through- put to better understand inter-job interference. We use a simulation tool called Damsel y to model the network be- havior of Edison and study the impact of various system parameters on network throughput. Parallel workloads based on ve representative communication patters are used and the simulation studies on up to 131,072 cores are aided by a new visualization of the dragon y network.

  15. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-04-01

    Supplement No. 6 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-540 and 50-441), has been prepared by the Office of the Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 5 to that report

  16. Industrial application of a graphics computer-based training system

    International Nuclear Information System (INIS)

    Klemm, R.W.

    1985-01-01

    Graphics Computer Based Training (GCBT) roles include drilling, tutoring, simulation and problem solving. Of these, Commonwealth Edison uses mainly tutoring, simulation and problem solving. These roles are not separate in any particular program. They are integrated to provide tutoring and part-task simulation, part-task simulation and problem solving, or problem solving tutoring. Commonwealth's Graphics Computer Based Training program was a result of over a year's worth of research and planning. The keys to the program are it's flexibility and control. Flexibility is maintained through stand alone units capable of program authoring and modification for plant/site specific users. Yet, the system has the capability to support up to 31 terminals with a 40 mb hard disk drive. Control of the GCBT program is accomplished through establishment of development priorities and a central development facility (Commonwealth Edison's Production Training Center)

  17. Conduct of operations training - An innovative approach to team building

    International Nuclear Information System (INIS)

    Widen, W.C.; Kurth, W.; Broccolo, A.

    1987-01-01

    The conduct of nuclear power plant operations is a key parameter for station management and regulators alike. Indeed, the basic methods and demeanor in which operating crews approach overall plant operations is perhaps the principal factor leading to safe and efficient operations. Hence, Commonwealth Edison's Zion Station has initiated an innovative and positive training program designed to increase operator awareness of conducting station operations in an attentive, diligent, and conscientious manner. This Conduct of Operations Training Program is a collaborative joint effort between Commonwealth Edison and the Westinghouse Nuclear Training Center. In particular, the key managers of Zion's operating department brainstormed various philosophies and strategies with senior training staff members of the Westinghouse Nuclear Training Center. The outcome of these sessions has formed the skeleton of an intensified, one-day Conduct of Operations course. Several unique aspects of this innovative course are described

  18. Germanium blocked impurity band far infrared detectors

    International Nuclear Information System (INIS)

    Rossington, C.S.

    1988-04-01

    The infrared portion of the electromagnetic spectrum has been of interest to scientist since the eighteenth century when Sir William Herschel discovered the infrared as he measured temperatures in the sun's spectrum and found that there was energy beyond the red. In the late nineteenth century, Thomas Edison established himself as the first infrared astronomer to look beyond the solar system when he observed the star Arcturus in the infrared. Significant advances in infrared technology and physics, long since Edison's time, have resulted in many scientific developments, such as the Infrared Astronomy Satellite (IRAS) which was launched in 1983, semiconductor infrared detectors for materials characterization, military equipment such as night-vision goggles and infrared surveillance equipment. It is now planned that cooled semiconductor infrared detectors will play a major role in the ''Star Wars'' nuclear defense scheme proposed by the Reagan administration

  19. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 8

    International Nuclear Information System (INIS)

    1986-01-01

    Supplement No. 8 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units and 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that has not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 7 to that report

  20. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-02-01

    Supplement No. 5 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, The Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 4 to that report

  1. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  2. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  3. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  4. 78 FR 24779 - Notice Pursuant to the National Cooperative Research and Production Act of 1993-Telemanagement Forum

    Science.gov (United States)

    2013-04-26

    ..., Hamilton, NEW ZEALAND; Nexio, Warsaw, POLAND; TV-7, Seversk, RUSSIA; Wellink, Moscow, RUSSIA; Corporate... Communications Corp., Middletown, NY; Mformation Software Technologies, Edison, NJ; Orchestral Networks, Atherton... names: China Comservice Software Technology Co., Ltd. to China Communication Service Application and...

  5. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  6. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  7. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  8. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  9. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  10. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-000] CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Complaint...

  11. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-10-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...

  12. 76 FR 59673 - Combined Notice of Filings #1

    Science.gov (United States)

    2011-09-27

    ... Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: SA... Edison Company submits tariff filing per 35.13(a)(2)(iii: SGIA WDAT SERV AG SCE-GPS UCSB Fuel Cell...

  13. Bioretention Systems: Partial Factorial Designs for Nitrate Removal

    Science.gov (United States)

    Changes in nutrient loadings are monitored by introducing captured stormwater runoff into eight outdoor rain gardens at EPA’s Urban Water Research Facility in Edison, New Jersey scaled for residential and urban landscapes. The partial factorial design includes non-vegetated meso...

  14. Rain Gardens: Stormwater Infiltrating Systems

    Science.gov (United States)

    The hydrological dynamics and changes in stormwater nutrient concentrations within rain gardens were studied by introducing captured stormwater runoff to rain gardens at EPA’s Urban Water Research Facility in Edison, New Jersey. The runoff used in these experiments was collected...

  15. Flow Dynamics and Nutrient Reduction in Rain Gardens

    Science.gov (United States)

    The hydrological dynamics and changes in stormwater nutrient concentrations within rain gardens were studied by introducing captured stormwater runoff to rain gardens at EPA’s Urban Water Research Facility in Edison, New Jersey. The runoff used in these experiments was collected...

  16. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  17. Zero plastics and the radiologically protected area low level waste lockout program. Final report

    International Nuclear Information System (INIS)

    Kelly, J.

    1995-11-01

    In 1993, EPRI initiated its Integrated LLW Cost and Volume Reduction Program. One key component of the project was the identification of unique or uncommon techniques and approaches to LLW management which could be transported with or without modification to other members of EPRI's Nuclear Power Business Group. Included among these unique approaches were: some nuclear stations had aggressively eliminated most of the plastic materials commonly used in radiologically protected areas (RPA), these included plastic bags, plastic sheeting and plastic sleeving; a few nuclear stations had completely eliminated from the RPA some of the disposable items routinely considered by most nuclear stations as absolutely essential, these included masking tape, duct tape and wood; a couple of leading edge plants were implementing RPA LLW lockout programs in an effort to control absolutely all materials entering or exiting the RPA and making the worker 100% responsible for managing her/his work environment. The above three approaches were so significant in their actual or potential impact that it was decided to initiate an independent research project to evaluate and demonstrate whether all three concepts could be implemented by a single nuclear station and with significant, positive results. This project reports on that research and demonstration project which was implemented at LaSalle and Zion nuclear stations, both of which are operated by Commonwealth Edison Company

  18. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  19. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  20. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  1. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  2. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  3. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  4. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  5. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  6. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  7. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  8. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  9. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  10. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  11. Favorable Decision Upholding Radioactive/Hazardous Mixed Waste Storage Civil Enforcement Policy

    Science.gov (United States)

    This page contains a copy of the U.S. Court of Appeals (District of Columbia Circuit) decision in Edison Electric Institute, et al. v. EPA, No. 91-1586, which upheld the EPA's August 29, 1991, radioactive/hazardous 'mixed waste' storage civil enforcement policy

  12. Performances of Metal Concentrations from Three Permeable Pavement Infiltrates

    Science.gov (United States)

    The U.S. Environmental Protection Agency designed and constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements: permeable interlocking concrete pavers, pervious concrete, and porous asphalt. Water sampling was con...

  13. Science: The Struggle for Survival, 1880 to 1894.

    Science.gov (United States)

    Kohlstedt, Sally Gregory

    1980-01-01

    The history of the Journal "Science" is described as it relates to problems in publication, editors, financing and collaboration. The success of the journal is attributed to the backing by prominent patrons including two inventors, Alexander Graham Bell and Thomas Edison. (SA)

  14. 75 FR 65667 - Lincoln Pharmacy; Revocation of Registration

    Science.gov (United States)

    2010-10-26

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Lincoln Pharmacy; Revocation of Registration... Order to Show Cause and Immediate Suspension of Registration (Order) to Lincoln Pharmacy (Respondent... pharmacy located at 52 Lincoln Highway, Edison, New Jersey, which is owned and operated by Mr. Vincent Hsia...

  15. Surface Infiltration Rates of Permeable Surfaces: Six Month Update (November 2009 through April 2010)

    Science.gov (United States)

    At the end of October 2009, EPA opened a parking lot on the Edison Environmental Center that included three parking rows of permeable pavement. The construction was a cooperative effort among EPA’s Office of Administration and Resources Management, National Risk Management Resea...

  16. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  17. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  18. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  19. Emergency preparedness training for local communities

    International Nuclear Information System (INIS)

    Cooley, M.J.; Thompson, K.K.

    1987-01-01

    Detroit Edison, in cooperation with Monroe County, has developed a comprehensive training program for local emergency workers in the area surrounding the Fermi 2 Nuclear Power Plant. Using expertise from both organizations, a program consisting of two videotapes, two slide-tapes and nine narrated slide series was produced to address the worker-specific training needs of county emergency workers. In June of 185, the program was approved by Detroit Edison and the Monroe County Board of Commissioners. To date, Monroe County has trained more than 1000 emergency workers. This program has been so well received that the county staff has developed and presented a modified version of this program to the general public. The result of this cooperative effort is increased public confidence in emergency preparedness at the state, local and utility level and a renewed spirit of cooperation and trust between the utility and local units of government

  20. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 10

    International Nuclear Information System (INIS)

    1986-09-01

    Supplement No. 10 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues and action items that had not been resolved or completed at the time of publication of the Safety Evaluation Report and Supplements Nos. 1 through 9 to that report

  1. 10CFR50.59 safety evaluations

    International Nuclear Information System (INIS)

    Grime, L.; Page, E.

    1987-01-01

    As a plant changes from the design phase to the operational phase, new regulations and standards apply. One such regulation is 10CFR50.59 on safety evaluations. Once an operating license is issued, it is mandatory to submit all applicable changes, tests, and experiments to the safety evaluation process. As preparation for this transition, Detroit Edison had procedures in place and conducted personnel training. Reviews of the safety engineering were conducted by the on-site review board. The off-site board delegated detailed reviews of most safety evaluations to the independent safety evaluation group (ISEG). The on-site group review included presentation of complete design packages by engineers. The ISEG and off-site review group's activity focused on safety evaluation. This paper addresses industry trends that were studied, Detroit Edison's recent actions, and industry issues related to 10CFR50.59 safety evaluations

  2. Achieving a SALP-1 radiation protection program

    International Nuclear Information System (INIS)

    Andersen, R.L.; Slider, J.E.

    1992-01-01

    In 1987, the Detroit Edison Company embarked on an ambitious program to raise the performance of the radiation protection (RP) program at its Fermi-2 nuclear plant. The target chosen was a systematic assessment of licensee's performance (SALP)-1 rating by the US Nuclear Regulatory Commission (NRC). This goal was achieved in the spring of 1990. This paper summarizes key parts of the improvement program undertaken by Detroit Edison, lessons learned from this experience, and recommendations about applying the lessons learned at other sites. This information may be particularly helpful to commercial and federal government sites wishing to upgrade the performance of their RP programs. Excellence does not necessarily require great expenditures on new equipment or additional staff. It requires a willingness and ability to examine all functions of the RP department and an honest assessment of the most efficient means to accomplish those functions

  3. John Ambrose Fleming and the Beginning of Electronics

    Energy Technology Data Exchange (ETDEWEB)

    Fred Dylla; Steve Corneliussen

    2004-11-01

    2004 was the centenary of John Ambrose Fleming's momentous patent on the thermionic diode that can be called the birth of electronics. The ''Edison effect'' was discovered in 1882; this was later shown to be the result of thermionic emission of electrons from a heated filament into a vacuum. Edison did not make any significant devices based on this discovery, and the effect was ignored for more than 8 years. In 1890 Fleming explained the effect and showed that the thermionic diode could be used as a rectifier. Fourteen years later Fleming filed his 1904 patent on the thermionic diode. It was the first public announcement of the electron tube; this revolutionized the development of radio and led to the invention of the thermionic triode by Lee de Forest in 1906. The background to these events will be described.

  4. Customer value - the missing link

    International Nuclear Information System (INIS)

    Pierce, A.R.; Martin, M.G.; Wagner, V.E.

    1993-01-01

    For many years electric utilities found it easy to provide value to their shareholders. With a monopoly service and decreasing costs it was easy to sell 70% more electricity each year and earn attractive returns. In the last 20 years electric utilities have teamed that it is not possible to provide value to their shareholders without providing value to their customers. Detroit Edison is learning that customer value is not always what the utility thinks it is. There is no better way to find out what customers value than to ask them. Detroit Edison has done a lot of direct asking in the last couple of years, through market research and individual interviews, and has learned indirectly from customers when a particular program does not succeed as we thought it should. Two areas where more has been learned about customer value are Demand Side Management (DSM) and Power Quality

  5. Programs that work : California case examples

    International Nuclear Information System (INIS)

    Rodgrigues, G.

    2007-01-01

    Examples of programs that work in California with respect to greenhouse gas emissions were discussed. Specifically, Southern California Edison (SCE) was noted as one of the country's largest investor-owned utilities that has provided environmental leadership in this area. Energy, environment, economy, and community were mentioned as being the four value propositions for demand side management (DSM) programs. The environmental benefits of California investor-owned utilities programs were also discussed. Customer participation in SCE's energy efficiency programs was defined as an important measure of success. Other topics that were addressed in the presentation included energy efficiency in the long-term resource plan; ratcheting codes and standards; effective marketing and outreach; residential and non-residential programs; partnership programs; and competitively-selected programs. Measurement, verification and evaluation were noted as being real savings. Initiatives on the horizon such as the California solar initiative and Edison smartconnect were presented. tabs., figs

  6. Commonwealth Edison Company pressure locking test report

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.; Kelly, J.F.

    1996-12-01

    Pressure Locking is a phenomena which can cause the unseating thrust for a gate valve to increase dramatically from its typical static unseating thrust. This can result in the valve actuator having insufficient capability to open the valve. In addition, this can result in valve damage in cases where the actuator capability exceeds the valve structural limits. For these reasons, a proper understanding of the conditions which may cause pressure locking and thermal binding, as well as a methodology for predicting the unseating thrust for a pressure locked or thermally bound valve, are necessary. This report discusses the primary mechanisms which cause pressure locking. These include sudden depressurization of piping adjacent to the valve and pressurization of fluid trapped in the valve bonnet due to heat transfer. This report provides a methodology for calculating the unseating thrust for a valve which is pressure locked. This report provides test data which demonstrates the accuracy of the calculation methodology.

  7. Commonwealth Edison Company pressure locking test report

    International Nuclear Information System (INIS)

    Bunte, B.D.; Kelly, J.F.

    1996-01-01

    Pressure Locking is a phenomena which can cause the unseating thrust for a gate valve to increase dramatically from its typical static unseating thrust. This can result in the valve actuator having insufficient capability to open the valve. In addition, this can result in valve damage in cases where the actuator capability exceeds the valve structural limits. For these reasons, a proper understanding of the conditions which may cause pressure locking and thermal binding, as well as a methodology for predicting the unseating thrust for a pressure locked or thermally bound valve, are necessary. This report discusses the primary mechanisms which cause pressure locking. These include sudden depressurization of piping adjacent to the valve and pressurization of fluid trapped in the valve bonnet due to heat transfer. This report provides a methodology for calculating the unseating thrust for a valve which is pressure locked. This report provides test data which demonstrates the accuracy of the calculation methodology

  8. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  9. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  10. Advanced Utility Mercury-Sorbent Field-Testing Program

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Landreth

    2007-12-31

    This report summarizes the work conducted from September 1, 2003 through December 31, 2007 on the project entitled Advanced Utility Mercury-Sorbent Field-Testing Program. The project covers the testing at the Detroit Edison St. Clair Plant and the Duke Power Cliffside and Buck Stations. The St. Clair Plant used a blend of subbituminous and bituminous coal and controlled the particulate emissions by means of a cold-side ESP. The Duke Power Stations used bituminous coals and controlled their particulate emissions by means of hot-side ESPs. The testing at the Detroit Edison St. Clair Plant demonstrated that mercury sorbents could be used to achieve high mercury removal rates with low injection rates at facilities that burn subbituminous coal. A mercury removal rate of 94% was achieved at an injection rate of 3 lb/MMacf over the thirty day long-term test. Prior to this test, it was believed that the mercury in flue gas of this type would be the most difficult to capture. This is not the case. The testing at the two Duke Power Stations proved that carbon- based mercury sorbents can be used to control the mercury emissions from boilers with hot-side ESPs. It was known that plain PACs did not have any mercury capacity at elevated temperatures but that brominated B-PAC did. The mercury removal rate varies with the operation but it appears that mercury removal rates equal to or greater than 50% are achievable in facilities equipped with hot-side ESPs. As part of the program, both sorbent injection equipment and sorbent production equipment was acquired and operated. This equipment performed very well during this program. In addition, mercury instruments were acquired for this program. These instruments worked well in the flue gas at the St. Clair Plant but not as well in the flue gas at the Duke Power Stations. It is believed that the difference in the amount of oxidized mercury, more at Duke Power, was the difference in instrument performance. Much of the equipment was

  11. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  12. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  13. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  14. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  15. Final environmental statement related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1982-04-01

    The proposed action is the issuance of an operating license to Commonwealth Edison Company (CECo) of Chicago, Illinois, for startup and operation of the Byron Station, Units 1 and 2 on a 710-ha (1754-acre) site in Ogle County 6 km (4 miles) south-southwest of Byron, Illinois, and 3 km (2 miles) east of the Rock River. Each of the two generating units consists of a pressurized-water reactor, four steam generators, one steam turbine generator, a heat-dissipation system, and associated auxiliary and engineered safeguards. Information is presented under the following topics: purpose and need for the action; alternatives to the proposed action; project description and affected environment; environmental consequences and mitigating actions; evaluation of the proposed action; list of contributors; list of agencies and organizations requested to comment on the draft environmental statement; and responses to comments on the Draft Environmental Statement

  16. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  17. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  18. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  19. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  20. ORD’s Urban Watershed Management Branch

    Science.gov (United States)

    This is a poster for the Edison Science Day, tentatively scheduled for June 10, 2009. This poster presentation summarizes key elements of the EPA Office of Research and Development’s (ORD) Urban Watershed Management Branch (UWMB). An overview of the national problems posed by w...

  1. 77 FR 48520 - Granting of Request for Early Termination of the Waiting Period Under the Premerger Notification...

    Science.gov (United States)

    2012-08-14

    ... Berger SE; Westcon Holdings, Inc.; Bilfinger Berger SE. 20121084 G Sony Corporation; GaiKai Inc.; Sony..., 2012 Through July 31, 2012 07/02/2012 20121012 G Pinnacle West Capital Corporation; Edison International; Pinnacle West Capital Corporation. 20121022 G Vector Capital IV International. L.P.; Technicolor...

  2. 78 FR 70032 - Combined Notice of Filings #1

    Science.gov (United States)

    2013-11-22

    .... Applicants: Florida Power & Light Company. Description: FPL Errata to the NITSA No. 162 Reallocation of.... ET 12/4/13. Docket Numbers: ER14-394-000. Applicants: Ethical Electric, Inc. Description: Ethical.... Docket Numbers: ER14-396-000. Applicants: Southern California Edison Company. Description: Notice of...

  3. 77 FR 41777 - Combined Notice of Filings #1

    Science.gov (United States)

    2012-07-16

    ... exempt wholesale generator filings: Docket Numbers: EG12-84-000. Applicants: Spion Kop Wind, LLC. Description: Spion Kop Wind, LLC Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date...., Commonwealth Edison Company, PECO Energy Company, Wind Capital Holdings, LLC, Constellation Power Source...

  4. Quantifying Evaporation and Evaluating Runoff Estimation Methods in a Permeable Pavement System

    Science.gov (United States)

    The U.S. Environmental Protection Agency constructed a 0.4-ha parking lot in Edison, New Jersey, that incorporated permeable pavement in the parking lanes which were designed to receive run-on from the impervious hot-mix asphalt driving lanes. Twelve lined permeable pavement sec...

  5. DEMONSTRATION OF SORBENT INJECTION TECHNOLOGY ON A WALL-FIRED UTILITY BOILER (EDGEWATER LIMB DEMONSTRATION)

    Science.gov (United States)

    The report gives results of the full-scale demonstration of Limestone Injection Multistage Burner (LIMB) technology on the coal-fired, 105 MW, Unit 4 boiler at Ohio Edison's Edgewater Station. eveloped as a technology aimed at moderate levels of sulfur dioxide (SO2) and nitrogen ...

  6. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  7. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  8. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  9. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  10. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  11. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  12. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  13. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  14. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  15. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  16. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  17. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  18. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  19. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  20. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  1. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  2. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  3. 10 Passed Technologies.

    Science.gov (United States)

    Montfort, Nick

    2001-01-01

    Argues that not every disappearing technology deserves that fate and presents 10 technologies that have an elegance and simplicity the winners lack such as the electric trolley, pneumatic post, Amiga, ribbon microphone, WordStar, Edison's wax cylinder, slide rule, reel mover, automatic watch, and airship. (Author/ASK)

  4. 75 FR 15949 - Revisions to Form, Procedures, and Criteria for Certification of Qualifying Facility Status for a...

    Science.gov (United States)

    2010-03-30

    ... technologies. \\20\\ Interstate Renewable Energy Council and SolarCity (Interstate Renewable); Sun Edison LLC... being small power production facilities, and 90 percent were made by solar-powered and wind-powered... electric energy solely by the use, as a primary energy source, of solar energy, wind energy, waste...

  5. 78 FR 68833 - Combined Notice of Filings #1

    Science.gov (United States)

    2013-11-15

    ... Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the... Company. Description: Southern California Edison Company submits LGIA with Portal Ridge Solar A, Portal Ridge Solar B, Portal Ridge Solar C to be effective 11/7/2013. Filed Date: 11/6/13. Accession Number...

  6. 78 FR 67355 - Combined Notice of Filings #2

    Science.gov (United States)

    2013-11-12

    ... Edison Company submits SGIA and Distribution Service Agmt with NRG Solar Blythe II LLC to be effective 12... submits BPA Trans System Interconnection Agmt--Wine Country to be effective 12/31/2013. Filed Date: 10/31... detailed information relating to filing requirements, interventions, protests, service, and qualifying...

  7. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  8. Research and development: widening the energy horizon

    Energy Technology Data Exchange (ETDEWEB)

    Darmstadter, J.; Landsberg, H.H.; Morton, H.C.

    1984-04-01

    Research and Development (R and D) is not a recent phenomenon. Only the name is new; the substance is old. Such scientists as Alessandro Volta, James Watt, or Thomas Edison would have been surprised to be told that they were in the R and D business, but, of course, they were. In fact, Edison was in the RDD and D business, the extra two D's standing for Demonstration and Deployment. In their lifetime such people were generally called inventors. Today, there are not only multitudes of individuals who engage in R and D, in small or large commercial groups, in government laboratories, or in universities, but there is also a substantial literature on just what R and D is and how it functions. In this article the authors try to identify current trends and where they might lead us and what policies are either in place or are desirable to draw the greatest benefit from R and D endeavors.

  9. A structured approach to individual plant evaluation and accident management

    International Nuclear Information System (INIS)

    Klopp, G.T.

    1991-01-01

    The current requirements for the performance of individual plant evaluations (IPE's) include the derivation of accident management insights as and if they occur in the course of finalizing an IPE. The development of formal, structured accident management programs is, however, explicitly excluded from current IPE requirements. The Nuclear Regulatory Commission is following the Nuclear Management and Resources Council (NUMARC) efforts to establish the framework(s) for accident management program development and plants to issue requirements on such development at a later date. The Commonwealth Edison program consists of comprehensive level 2 PRA's which address the requirements for IPE's and which go beyond those requirements. From the start of the IPE efforts, it was firmly held, within Edison, that the best way to fully and economically extract a viable accident management program from an IPE was to integrate the two efforts from the start and include the accident management program development as a required IPE product

  10. Estimation of the economic impacts of Three Mile Island nuclear power plant accident

    International Nuclear Information System (INIS)

    Sagara, Aya; Fujimoto, Noboru; Fukuda, Kenji

    1998-01-01

    The Three Mile Island nuclear power plant accident had an immediate negative impact on the economy of the seven-country area which surrounds the plant site. In order to estimate the social effect of the nuclear power plant accident economically, immediate and short term economical impacts on some industrial classification have been evaluated. The economical effect to Metropolitan Edison Co., the circumstantial payment of the insurance and the lawsuit for the compensation for damages, etc. have been estimated at dollar 90 million for the manufacturing and nonmanufacturing industry, dollar 5 million for the tourist industry and dollar 50,000 for agriculture. The total loss for the state and country governments is about dollar 90,000. Metropolitan Edison Co. expended also dollar 111 million for the substitute energy and dollar 760 million for the decontamination cost. Since the lawsuit for the compensation for damages is still continuing, the total impacts cost is calculated more than a billion dollar. (author)

  11. Programs that work : California case examples

    Energy Technology Data Exchange (ETDEWEB)

    Rodgrigues, G. [Southern California Edison, Rosemead, CA (United States)

    2007-07-01

    Examples of programs that work in California with respect to greenhouse gas emissions were discussed. Specifically, Southern California Edison (SCE) was noted as one of the country's largest investor-owned utilities that has provided environmental leadership in this area. Energy, environment, economy, and community were mentioned as being the four value propositions for demand side management (DSM) programs. The environmental benefits of California investor-owned utilities programs were also discussed. Customer participation in SCE's energy efficiency programs was defined as an important measure of success. Other topics that were addressed in the presentation included energy efficiency in the long-term resource plan; ratcheting codes and standards; effective marketing and outreach; residential and non-residential programs; partnership programs; and competitively-selected programs. Measurement, verification and evaluation were noted as being real savings. Initiatives on the horizon such as the California solar initiative and Edison smartconnect were presented. tabs., figs.

  12. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 9

    International Nuclear Information System (INIS)

    1986-03-01

    Supplement No. 9 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO) for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the staff's evaluation findings pertaining to the earthquake event that occurred in the vicinity of the Perry Nuclear Power Plant site on January 31, 1986, and is limited to that evaluation. Future supplemental reports will continue reporting on the status of new or unresolved issues since Supplement No. 8 was issued in January 1986

  13. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  14. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  15. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  16. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  17. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  18. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  19. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  20. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  1. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  2. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  3. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  4. OUT Success Stories: Solar Trough Power Plants

    Science.gov (United States)

    Jones, J.

    2000-08-01

    The Solar Electric Generating System (SEGS) plants use parabolic-trough solar collectors to capture the sun's energy and convert it to heat. The SEGS plants range in capacity from 13.8 to 80 MW, and they were constructed to meet Southern California Edison Company's periods of peak power demand.

  5. 77 FR 36423 - Labeling Requirements for Alternative Fuels and Alternative Fueled Vehicles

    Science.gov (United States)

    2012-06-19

    ... delivered to the following address: Federal Trade Commission, Office of the Secretary, Room H-113 (Annex N... cell, advanced lean burn, and hybrid motor vehicles) that were added to the definition of ``alternative... legislation (i.e., lean burn, hybrid, and fuel cell vehicles). No comments opposed this approach. Edison...

  6. Condition Assessment of Ferrous Water Transmission and Distribution Systems State of Technology Review Report

    Science.gov (United States)

    This White Paper was developed to serve as the basis for discussion at a Technology Forum on Condition Assessment of Water Transmission and Distribution Systems that was held on September 9 and 10, 2008, at Edison, NJ. It was distributed to the Forum participants for review in a...

  7. 77 FR 67313 - Revising the Exemption for Digger Derricks in the Cranes and Derricks in Construction Standard

    Science.gov (United States)

    2012-11-09

    ...'' chart).\\2\\ In addition, electric utilities typically place distribution transformers in a right of way... August 9, 2010, and the Edison Electric Institute (EEI) petitioned for review of the standard in the... broaden the exemption for digger derricks used in the electric-utility industry by means of this proposed...

  8. Fulltext PDF

    Indian Academy of Sciences (India)

    Ahmed Zewail Wins the 1999 Nobel Prize in Chemistry. Puspendu Kumar Das. RESEARCH NEWS. 101 More than a Handful 000 Ns +. A G Samuelson. BOOK REVIEWS. 105 Birds of Rishi Valley, and Renewal of their Habitats. Mahesh Rangarajan. Front Cover. : Edison's Phonograph. Back Cover. (Courtesy: Sujit K Sikdar).

  9. International recognition for ageing research: John Scott Award-2014 to Leonard Hayflick and Paul Moorhead

    DEFF Research Database (Denmark)

    Rattan, Suresh

    2014-01-01

    is the oldest scientific award in the United States and, as a legacy to Benjamin Franklin, they are in the historic company of past winners who include Marie Curie, Thomas Edison, Jonas Salk, Irving Langmuir, Nicola Tesla, Guglielmo Marconi, R. Buckminister Fuller, Sir Alexander Fleming, Sir Howard Florey...

  10. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  11. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  12. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  13. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  14. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  15. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  16. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  17. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  18. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  19. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  20. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  1. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  2. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  3. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  4. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  5. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  6. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  7. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  8. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  9. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  10. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  11. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  12. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  13. Final status report in preparation for the chemical cleaning of Dresden-1, DNS-D1-034

    International Nuclear Information System (INIS)

    1981-09-01

    This report discusses the status of all of the activities conducted in preparation for the chemical cleaning of the Dresden-1 Nuclear Power Plant of Commonwealth Edison of Illinois. The metallurgical testing of a solvent and its ability to remove radioactivity are reviewed. Included are all engineering details relating to the modifications to the primary system to be able to perform the chemical cleaning and to rinse the cleaning solvent out of the equipment. A facility to store and process spent cleaning solutions is described in detail. Construction activities and preoperational activities are recounted. Licensing activities, quality assurance, safety, and radiation protection are discussed. The report includes recommendations for future actions for restarting the project when approval is received. All of the efforts discussed in this Final Status Report led to the conclusion that the chemical cleaning, as planned, was feasible. All of the necessary modifications and new equipment are in place and are operational

  14. Power plant and utility performance: how world-record outages are being achieved in the USA

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Two record-breaking refuelling outages at power reactors in the USA are described. The first, at Browns Ferry 3 BWR, was accomplished in 19 days 39 minutes - a shorter time than for an General Electric BWR anywhere in the world hitherto. The management attribute this success to planning, personnel and performance. As well as refuelling, inspections and maintenance, major modifications were carried out. These included the completion of the installation of digital feedwater reactor level control and digital feedwater heater level control. The second outage, at South Texas Project 2 BWR, at 17 days 14 hours and 10 minutes was the fastest yet recorded for any US nuclear unit. This achievement is ascribed to excellent outage preparation and scheduling, the superior condition of the plant equipment and teamwork and safety consciousness on behalf of the plant personnel. Finally, brief consideration is given to the nuclear performance recovery programme of Commonwealth Edison and Ontario Hydro Nuclear. (UK)

  15. Testing and model-aided analysis of a 2 kW el PEMFC CHP-system

    Science.gov (United States)

    König, P.; Weber, A.; Lewald, N.; Aicher, T.; Jörissen, L.; Ivers-Tiffée, E.; Szolak, R.; Brendel, M.; Kaczerowski, J.

    A prototype PEMFC CHP-system (combined heat and power) for decentralised energy supply in domestic applications has been installed in the Fuel Cell Testing Laboratory at the Institut für Werkstoffe der Elektrotechnik (IWE), Universität Karlsruhe (TH). The system, which was developed at the Zentrum für Sonnenenergie- und Wasserstoff-Forschung ZSW, Ulm (FC-stack) and the Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg (reformer) is operated and tested in close cooperation with the Stadtwerke Karlsruhe. The tests are carried out as part of the strategic project EDISon, which is supported by the German Federal Ministry of Economics and Technology (BMWA). The performance of the system is evaluated for different operating conditions. The tests include steady state measurements under different electrical and thermal loads as well as an analysis of the dynamic behaviour of the system during load changes. First results of these steady state and dynamic operation characteristics will be presented in this paper.

  16. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  17. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  18. High School and College Kids Collaborate on BOTS Competition

    Science.gov (United States)

    Hance, Dennis

    2012-01-01

    During the fall semester of 2010, mechanical engineering students from Edison State Community College and Wright State University shared their skills and knowledge with students from the Upper Valley JVS (UVJVS) pre-engineering technology program in a highly motivating robotics activity. The activity culminated in 47 teams from regional high…

  19. 76 FR 59119 - Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2011-09-23

    ... the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid... Motor Sales) ; on the east by Piers C and D; on the south by Southern California Edison (SCE) property... system, 12 rail-mounted electric-powered gantry cranes, and intermodal rail yard (10-loading tracks...

  20. Inventors and Inventions.

    Science.gov (United States)

    Dawson, Tom

    An 8-day unit introduces middle school students to American inventors and inventions. In separate lessons, students examine the patenting process, women inventors, minority inventors, Native American inventors, the airplane, Thomas Edison, and the impact of inventions on America's growth. A brief outline of daily lesson plans precedes a section of…

  1. LED licht van de toekomst

    NARCIS (Netherlands)

    Zeiler, W.

    2009-01-01

    De gloeilamp is verleden tijd, na ongeveer 125 jaar na de ontdekking door Thomas Edison valt langzaam maar zeker binnen een decennium het doek. Australië heeft de klassieke gloeilamp al in de ban gedaan en vele landen volgen deze trend. De rol van de klassieke gloeilamp wordt overgenomen door LED.

  2. Inspiration: One Percent and Rising

    Science.gov (United States)

    Walling, Donovan R.

    2009-01-01

    Inventor Thomas Edison once famously declared, "Genius is one percent inspiration and ninety-nine percent perspiration." If that's the case, then the students the author witnessed at the International Student Media Festival (ISMF) last November in Orlando, Florida, are geniuses and more. The students in the ISMF pre-conference workshop…

  3. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  4. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  5. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  6. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  7. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  8. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  9. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  10. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  11. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  12. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  13. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  14. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  15. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  16. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  17. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  18. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  19. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  20. RES MARCH COV 07 PRINT DP

    Indian Academy of Sciences (India)

    motors on AC. As a result of the “War of Currents”, Edison and. Westinghouse went nearly bankrupt. So in 1897, Tesla released. Westinghouse from contract obligations, providing Westinghouse a break from Tesla's patent royalties. In doing so Tesla gave away nearly 12 million dollars in royalty that he would have received.

  1. 78 FR 78508 - Quarterly Rail Cost Adjustment Factor

    Science.gov (United States)

    2013-12-26

    ... (ICC) outlined the procedures for calculating the all-inclusive index of railroad input prices [[Page... Association of American Railroads (AAR) is required to calculate the index on a quarterly basis and submit it... Procedures--Productivity Adjustment, 5 I.C.C.2d 434 (1989), aff'd sub nom. Edison Electric Institute v. ICC...

  2. Outlook for California's electric utility industry

    International Nuclear Information System (INIS)

    Frank, S.E.

    1996-01-01

    This article describes how the Southern California Edison Company deals with revolutionary change as the state's electricity industry reinvents itself. The topics of the article include how competition has make things better for SCEC's employees, customers, and shareholders, and an outline of the principal features of the electric utility industry in California

  3. What's Happening in February?

    Science.gov (United States)

    Weissman, Ron; And Others

    Brief information is given on 12 February events celebrated by Puerto Ricans: Groundhog Day; Candlemas; St. Valentine's Day; Mardi Gras; Ash Wednesday; Black History; and the birthdays of Thomas Alva Edison, Abraham Lincoln, Susan B. Anthony, Julia de Burgos, Luis Munoz Marin, and George Washington. Designed as a teacher resource, the booklet…

  4. Planting Seeds, Growing Diversity

    Science.gov (United States)

    Hua, Vanessa

    2011-01-01

    Last year, when students at Ridgecrest Intermediate School in Palos Verdes, California, were asked to name scientists, their answers--Benjamin Franklin, Thomas Edison, Albert Einstein, Bill Nye the Science Guy--reflected a common perception. Most of the leading scientists they came up with were white, male, or dead. Although women and people of…

  5. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  6. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  7. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  8. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  9. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  10. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  11. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  12. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  13. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  14. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  15. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  16. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  17. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  18. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  19. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  20. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  1. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  2. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  3. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  4. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  5. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  6. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  7. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  8. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  9. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  10. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  11. Permeable Pavement Research at the Edison Environmental Center

    Science.gov (United States)

    There are few detailed studies of full-scale, replicated, actively-used permeable pavement systems. Practitioners need additional studies of permeable pavement systems in its intended application (parking lot, roadway, etc.) across a range of climatic events, daily usage conditio...

  12. Edison's Modern Legend in Villiers' L'Eve future

    Directory of Open Access Journals (Sweden)

    Ana Oancea

    2012-03-01

    International and Electrical Expositions of the 1870s and 1880s. Villiers’ depiction of the protagonist as astute showman does not, however, amount to a criticism of his technological abilities. Instead, the author’s emphasis on these characteristics goes to solidify his legend as a modern, unique tale of economic success through applied science.

  13. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  14. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  15. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  16. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  17. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  18. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  19. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  20. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  1. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  2. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  3. 78 FR 18420 - Special Permit Applications Actions

    Science.gov (United States)

    2013-03-26

    ... of Energy, 49 CFR, 49 CFR Sec. To authorize the Washington, DC. 173.310. transportation in commerce..., attached to or 173.302(f)(3) and Sec. suspended from an aircraft, 175.75. in remote areas of the US without... transportation in Agency Region II, commerce of certain Edison, NJ. hazardous materials in support of the...

  4. Lessons from the Past for the Next Generation of Educational Video

    Science.gov (United States)

    Bush, Michael D.

    2015-01-01

    Hype surrounding the promise that technology has for education began with Thomas Edison in 1913, when he predicted that the motion picture would end the need for textbooks and revolutionize schools. Years later a phase of development was fueled by government funding, and the educational film industry reached a heyday following World War II, which…

  5. Strategies for organizing training: centralized or decentralized

    International Nuclear Information System (INIS)

    Kanous, L.E.

    1979-01-01

    STudies were conducted in the Detroit Edison Company for the purpose of determining effectiveness of training. A systems approach from the corporate perspective was found to be needed and worthwhile. At the conclusion of these studies a decision was made to move in the direction of a centralized vs decentralized organizational strategy for training

  6. The Turn of the Century. Tenth Grade Lesson. Schools of California Online Resources for Education (SCORE): Connecting California's Classrooms to the World.

    Science.gov (United States)

    Bartels, Dede

    In this 10th grade social studies and language arts interdisciplinary unit, students research and report on historical figures from the turn of the 20th century. Students are required to work in pairs to learn about famous and common individuals, including Andrew Carnegie, Samuel Gompers, Susan B. Anthony, Thomas Edison, Theodore Roosevelt, Booker…

  7. College Learning Anytime, Anywhere. New Ways for Anyone to Get College Credits and College Degrees by Off-Campus Study and Examinations.

    Science.gov (United States)

    Nyquist, Ewald B.; And Others

    Nontraditional methods of qualifying for a college degree are described in this student guide to off-campus study and examination. The three external degree institutions in the United States that offer these programs are discussed. They include: Regents External Degree Program of the University of the State of New York; Thomas A. Edison College of…

  8. Visualizing Music: The Archaeology of Music-Video.

    Science.gov (United States)

    Berg, Charles M.

    Music videos, with their characteristic visual energy and frenetic music-and-dance numbers, have caught on rapidly since their introduction in 1981, bringing prosperity to a slumping record industry. Creating images to accompany existing music is, however, hardly a new idea. The concept can be traced back to 1877 and Thomas Edison's invention of…

  9. Queens Tri-School Confederation, 1991-92 Evaluation Report.

    Science.gov (United States)

    Hannah, Susan; Dworkowitz, Barbara

    An evaluation was done of the Queens Tri-School Confederation, three high schools in the New York City Public Schools funded by a federal grant from the Magnet Schools Assistance Program. The grant provided Hillcrest, Jamaica, and Thomas A. Edison High Schools with funds to develop or expand emergency technician programs at Hillcrest; a law…

  10. Command and Control for War and Peace

    Science.gov (United States)

    1992-01-01

    can’t create crea- tivity ex nihilo. To guarantee the development of a creative genius comparable to a Thomas Edison, a William Shakespeare , a Frank...stalking them. One hiker sits down and takes off his hiking boots, replacing them with his running shoes, "What good will that do?" asks his companion

  11. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  12. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  13. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  14. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  15. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  16. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  17. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  18. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  19. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  20. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  1. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  2. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  3. Modification of an existing radwaste facility to provide onsite low level waste storage

    International Nuclear Information System (INIS)

    Ault, G.M.; Reiss, J.F.; Commonwealth Edison Co., Chicago, IL)

    1985-01-01

    The decision of whether or not to install onsite storage capacity for low-level radioactive waste is dictated by individual utility circumstances. Commonwealth Edison has decided to construct facilities to store low-level radwaste onsite at each of their four operating nuclear stations, and they plan to have those facilities in operation by January, 1986. At Dresden, that onsite storage capacity is being provided by modifying an existing radwaste building which already has installed a remotely-operated precision-placement type crane. The purposes of this paper are to describe: (1) how Commonwealth Edison arrived at the decision to construct onsite storage facilities as a hedge against possible disruption of burial site availability in January, 1986; (2) why the desire to minimize the capital investment for this protection led to selection of an uncomplicated design for their ''standard'' facility and to the decision to modify an existing building at Dresden rather than construct a new one; and (3) what is being done to adapt the Dresden 1 Decontamination/Radwaste Building for extended onsite storage

  4. The development of an effective performance indicator program aids management effectiveness

    International Nuclear Information System (INIS)

    Kelm, R.R.

    1989-01-01

    One problem that has plagued nuclear security departments has been the failure to adequately develop accurate and effective means of tracking and trending computer-based security system performance data at nuclear power facilities. The purpose of this paper is twofold: to provide information on the development and uses of one system employed by the Detroit Edison Company that has proven to be an effective performance indicator system to track security system data and to explain how management makes use of the system data. The performance indicator system has had a remarkable effect on the department's performance. The system's users have become more effective in isolating problems with security system components. The data have been utilized as part of the cost/benefit analysis for justifying improvements or equipment upgrades, clearly documenting cost savings. Finally, security management at all levels is able to promptly identify individual problems or trends. The time, money, and hours devoted to system development have greatly contributed to Detroit Edison's nuclear security department achieving a SALP 1 rating

  5. MPAS-Ocean NESAP Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, Mark Roger [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Arndt, William [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Keen, Noel [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-19

    NESAP performance improvements on MPAS-Ocean have resulted in a 5% to 7% speed-up on each of the examined systems including Cori-KNL, Cori-Haswell, and Edison. These tests were configured to emulate a production workload by using 128 nodes and a high-resolution ocean domain. Overall, the gap between standard and many-core architecture performance has been narrowed, but Cori-KNL remains considerably under-performing relative to Edison. NESAP code alterations affected 600 lines of code, and most of these improvements will benefit other MPAS codes (sea ice, land ice) that are also components within ACME. Modifications are fully tested within MPAS. Testing in ACME across many platforms is underway, and must be completed before the code is merged. In addition, a ten-year production ACME global simulation was conducted on Cori-KNL in late 2016 with the pre-NESAP code in order to test readiness and configurations for scientific studies. Next steps include assessing performance across a range of nodes, threads per node, and ocean resolutions on Cori-KNL.

  6. Safety Evaluation Report related to the restart of Davis-Besse Nuclear Power Station, Unit 1, following the event of June 9, 1985 (Docket No. 50-346)

    International Nuclear Information System (INIS)

    1986-06-01

    On June 9, 1985, the Davis-Besse Nuclear Power Station, operated by the Toledo Edison Company, experienced a partial loss of main feedwater while the plant was at 90% power. The ensuing reactor trip was followed by spurious isolation of the steam geneators which initiated a chain of events involving a number of equipment malfunctions and several operator errors ultimately interrupting all feedwater for a short period of time. By the time operators were able to restore feedwater, both steam generators had dried out. A letter from the Director of the Office of Nuclear Reactor Regulation, pursuant to 10 CFR 50.54(f) of the Commission's regulations, confirmed that the Davis-Besse facility would not be restarted without NRC approval. The letter also requested that Toledo Edison submit its program for resolving numerous concerns identified by the staff. In response, the license submitted the Davis-Besse Course of Action report. The staff has reviewed that document and other supporting material submitted by the licensee; the staff's evaluation of that information is presented in this report

  7. Tesla the life and times of an electric messiah

    CERN Document Server

    Cawthorne, Nigel

    2014-01-01

    Despite being incredibly popular during his time, Nikola Tesla today remains largely overlooked among lists of the greatest inventors and scientists of the modern era.  Thomas Edison gets all the glory for discovering the light bulb, but it was his one time assistant and life long arch nemesis, Tesla, who made the breakthrough in alternating current technology.  Edison and Tesla carried on a bitter feud for years, but it was Tesla's AC generators that illuminated the 1893 World's Fair in Chicago; the first time that an event of such magnitude had ever taken place under artificial light.  Today, all homes and electrical appliances run on Tesla's AC current.Born in Croatia in 1856, Tesla spoke eight languages and as well as almost single handedly developing household electricity.  During his life, he patented more than 700 inventions.  He invented electrical generators, FM radio, remote control robots, spark plugs and fluorescent lights.  He had a photographic memory and did advanced calculus and physic...

  8. Lessons learned from first generation nuclear plant probabalistic risk assessments

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1984-01-01

    The paper by Garrick summarizes the state-of-the-art in what are perhaps the most archetypical probabilistic risk assessments (PRAs). Because of its unique regulatory environment and because of the high levels of perceived (not necessarily actual) risk, the nuclear industry more than any other has been concerned with quantitative risk analysis. Garrick's paper summarizes the lessons learned from ten PRA's conducted in the nuclear industry, including six that can be characterized as full-scope risk studies. Most of the quantitative data, though, came from two especially thorough studies done for the Zion and Indian Point power plants, operated by Commonwealth Edison and Consolidated Edison respectively. The principal conclusions of the Garrick survey are that the public risk (from radiation release) is now known to be very small for commercial nuclear power plants, but that the risk to utilities (from core damage) is somewhat larger. Significant radiation releases require both core meltdown -- an event occurring only about once every 10,000 reactor-years -- and containment failure, occurring only about once in every hundred meltdowns

  9. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  10. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  11. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  12. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  13. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  14. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  15. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  16. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  17. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  18. Ultra advanced projects. ; Naming hyper-hightech projects. (Cho) no tsuku project. ; Naming no shikumi

    Energy Technology Data Exchange (ETDEWEB)

    Goto, Y. (Ministry of International Trade and Industry, Tokyo (Japan))

    1992-10-05

    Significance of using 'super' for naming a project of technological development is discussed. Functions of naming are classified into (1) recognition, (2) display and (3) sales-promotion, whereby mechanism of naming of merchandise that is developed through the technique of 3 is considered. Further, the mechanism of naming is discussed in relation to marketing. It is pointed out that naming of merchandise is determined on the basis of (1) concept of planned goods and (2) marketing-mixes composed of goods, price, sales-roots and sales-promotion. The same mechanism works also in a project for technological development. Technical trends are caught and projects are targetted by taking supposed regimes into account, thereby the most suitable mix is formed. The mix in the technological development is assumed to be composed of purpose, specification, regime and sales-promotion. Two examples of the governmental projects by Ministry of International Trade and Industry, 'the big regime for research and development on industrial technologies' and 'the regime for development of the fundamental technologies in the next generation' are introduced and the significance of their naming is described. 2 tabs.

  19. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  20. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  1. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  2. Geothermal Program Review X: proceedings. Geothermal Energy and the Utility Market -- the Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Each year the Geothermal Division of the US Department of Energy conducts an in-depth review of its entire geothermal R&D program. The conference serves several purposes: a status report on current R&D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal city. This year`s conference, Program Review X, was held in San Francisco on March 24--26, 1992. The theme of the review, ``Geothermal Energy and the Utility Market -- The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market,`` focused on the needs of the electric utility sector. Geothermal energy, with its power capacity potential of 10 GWe by the year 2010, can provide reliable, enviromentally clean electricity which can help offset the projected increase in demand. Program Review X consisted of seven sessions including an opening session with presentations by Mr. Vikram Budhraja, Vice President of System Planning and Operations, Southern California Edison Company, and Mr. Richard Jaros, President and Chief Operating Officer, California Energy Company. The six technical sessions included presentations by the relevant field researchers covering DOE-sponsored R&D in hydrothermal, hot dry rock, and geopressured energy. Individual projects are processed separately for the data bases.

  3. Geothermal energy and the utility market -- the opportunities and challenges for expanding geothermal energy in a competitive supply market: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Each year the Geothermal Division of the US Department of Energy conducts an in-depth review of its entire geothermal R D program. The conference serves several purposes: a status report on current R D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal city. This year's conference, Program Review X, was held in San Francisco on March 24--26, 1992. The theme of the review, Geothermal Energy and the Utility Market -- The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market,'' focused on the needs of the electric utility sector. Geothermal energy, with its power capacity potential of 10 GWe by the year 2010, can provide reliable, enviromentally clean electricity which can help offset the projected increase in demand. Program Review X consisted of seven sessions including an opening session with presentations by Mr. Vikram Budhraja, Vice President of System Planning and Operations, Southern California Edison Company, and Mr. Richard Jaros, President and Chief Operating Officer, California Energy Company. The six technical sessions included presentations by the relevant field researchers covering DOE-sponsored R D in hydrothermal, hot dry rock, and geopressured energy. Individual projects are processed separately for the data bases.

  4. Before the year 2000: Artificial neural networks may set the standard

    International Nuclear Information System (INIS)

    Michal, R.A.

    1994-01-01

    The use of artifical neural networks (ANNs) for monitoring of equipment and components in nuclear power plants could be commonplace before the turn of the century. Within five years, the relative inexpensiveness of neural networks could usher in a technology that will be used to detect incipient faults in machinery and increase effectiveness of maintenance scheduling. Working since November 1992 with the Electric Power Research Institute on research and development of the technology, SynEx and another Virginia-based company, A ampersand T, Inc., will later this year demonstrate prototype ANN systems at Consolidated Edison Company and New York State Electric Gas fossil fuel power plants. (Fossil fuel plants were chosen for the project because of easier access, as opposed to the security measures in place at nuclear facilities.) The demonstration will utilize sensors and the neural network systems to detect abnormal equipment behavior, sending signals back to centralized monitoring boards located in each plant's control room. The cost of the project, including research and development, will reach $1 million. However, the cost of installing a neural network at a nuclear plant within the next five years, according to Birdsall, could be as low as $10,000 to $15,000, with hopes of reducing the expenditure to just $5000

  5. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  6. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  7. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  8. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  9. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  10. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  11. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  12. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  13. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  14. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  15. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  16. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  17. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  18. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  19. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  20. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site