  1. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  2. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  3. Supply of nuclear materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-15

    Any large-scale atomic energy programme is inherently dependent on the availability of materials that can be used as fuel in reactors, and the International Atomic Energy Agency, at its inception, was intended to act as a bank for the flow of materials between Member States. According to its Statute, one of its primary functions is to provide materials 'to meet the needs of research on, and development and practical application of, atomic energy for peaceful purposes, including the production of electric power, with due consideration for the needs of the under-developed areas of the world'. If the Agency is to fulfil its Statutory function, it would be essential for it to have not only some ready sources of supply, but also an established framework of general terms and conditions on which it could secure the supplies. The latter would eliminate the need for going through elaborate procedural formalities whenever the Agency receives a new request for materials. Such a framework has now been established with the signing of broad agreements with three countries which had offered to supply various quantities of special fissionable materials to the Agency. These agreements, signed in Vienna on 11 May 1959, with the USSR, the UK and the USA, lay down the basic terms and conditions on which these three countries will make nuclear materials available when needed by the Agency. The USSR has agreed to make available to the Agency 50 kg of uranium-235, the UK 20 kg and the USA 5 000 kg. The material will be supplied in the form of enriched uranium in any concentration up to 20 per cent; the amounts mentioned relate to the 235-isotope content of the materials. The UK and the USA have agreed that the parties to a particular supply agreement may decide on higher enrichment of uranium to be used for research reactors, material testing reactors or for other research purposes. The USA has also agreed to make available to the Agency such additional supplies as would match in amount

  4. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  5. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  6. Installation for fatigue testing of materials at cryogenic temperatures

    International Nuclear Information System (INIS)

    Abushenkov, I.D.; Chernetskij, V.K.; Il'ichev, V.Ya.

    1986-01-01

    A new installation for mechanical fatigue tests of structural material samples is described, in which the possibility to conduct tests in the range of lower temperatures (4.2-300 K) is ensured. The installation permits to carry out fatigue tests using the method of axial loading of annular (up to 6 mm in diameter) and plane (up to 12 mm wide) samples during symmetric, asymmetric and pulsing loading cycles. It is shown that the installation suggested has quite extended operation possibilities and, coincidentally, it is characterized by design simplicity, compactness, comparatively low metal consumption and maintenance convenience

  7. Sustainability of water-supply at military installations, Kabul Basin, Afghanistan

    Science.gov (United States)

    Mack, Thomas J.; Chornack, Michael P.; Verstraeten, Ingrid M.; Linkov, Igor

    2014-01-01

    The Kabul Basin, including the city of Kabul, Afghanistan, is host to several military installations of Afghanistan, the United States, and other nations that depend on groundwater resources for water supply. These installations are within or close to the city of Kabul. Groundwater also is the potable supply for the approximately four million residents of Kabul. The sustainability of water resources in the Kabul Basin is a concern to military operations, and Afghan water-resource managers, owing to increased water demands from a growing population and potential mining activities. This study illustrates the use of chemical and isotopic analysis, groundwater flow modeling, and hydrogeologic investigations to assess the sustainability of groundwater resources in the Kabul Basin.Water supplies for military installations in the southern Kabul Basin were found to be subject to sustainability concerns, such as the potential drying of shallow-water supply wells as a result of declining water levels. Model simulations indicate that new withdrawals from deep aquifers may have less of an impact on surrounding community water supply wells than increased withdrawals from near- surface aquifers. Higher rates of recharge in the northern Kabul Basin indicate that military installations in that part of the basin may have fewer issues with long-term water sustainability. Simulations of groundwater withdrawals may be used to evaluate different withdrawal scenarios in an effort to manage water resources in a sustainable manner in the Kabul Basin.

  8. Instructional Aids, Materials, and Supplies--Guidelines.

    Science.gov (United States)

    Education Development Center, Inc., Newton, MA.

    This resource guide produced for the Follow Through Program, primarily lists instructional aids and supplies; it also suggests practical implications for provisioning the classroom environment, gives specific suggestions for Project Follow Through directors, and lists addresses of suppliers. The materials are divided into nine categories, which…

  9. Combined installation of electric and heat supply for climatic conditions of Iraq

    Science.gov (United States)

    Kaisi, Osama Al; Sidenkov, D. V.

    2017-11-01

    Electricity, heating and cooling are the three main components that make up the energy consumption base in residential, commercial and public buildings around the world. Demand for energy and fuel costs are constantly growing. Combined cooling, heating and power generation or trigeneration can be a promising solution to such a problem, providing an efficient, reliable, flexible, competitive and less harmful alternative to existing heat and cold supply systems. In this paper, scheme of the tri-generation plant on non-aqueous working substances is considered as an installation of a locally centralized electro-heat and cold supply of a typical residential house in a hot climate. The scheme of the combined installation of electro-heat (cold) supply consisted of the vapor power plant and heat pump system on low-boiling working substance for local consumers under the climatic conditions of Iraq is presented. The possibility of using different working substances in the thermodynamic cycles of these units, which will provide better efficiency of such tri-generation systems is shown. The calculations of steam turbine cycles and heat pump part on the selected working substances are conducted. It is proposed to use heat exchangers of plate type as the main exchangers in the combined processing. The developed method of thermal-hydraulic calculation of heat exchangers implemented in MathCad, which allows to evaluate the efficiency of plants of this type using the ε - NTU method. For the selected working substances of the steam part the optimal temperature of heat supply to the steam generator is determined. The results of thermodynamic and technical-economic analysis of the application of various working substances in the “organic” Rankine cycle of the steam turbine unit and the heat pump system of the heat and cold supply system are presented.

  10. Proposal to negotiate a contract, without competitive tendering, for the supply and installation of pipework for the new hostel

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate a contract for the supply and installation of new piping as preparatory work for the construction of a third on-site hostel. For the reasons explained in this document, the Finance Committee is invited to approve a contract with the SERVICES INDUSTRIELS DE GENEVE (SIG) (CH), without competitive tendering, for the supply and installation of new piping for an amount not exceeding 700 000 Swiss francs, not subject to revision.

  11. Irradiation facilities for materials research: IFMIF and small scale installations

    International Nuclear Information System (INIS)

    Perlado, J. M.; Victoria, M.

    2007-01-01

    The research of advance materials in nuclear fields such as new fission reactors (Generation-IV), Accelerator Driven Systems for Transmutation of Radioactive Wastes and Nuclear Fusion, is becoming very much common in the types of low activation and radiation resistant Materials. Ferritic-Martensitic Steels (based in 9-12 Cr) with or without Oxide Dispersion Techniques (Ytria Nanoparticles), Composites materials are becoming the new generation to answer requirements of high temperature, high radiation resistance of structural materials. Special dedication is appearing in general research programmes to this area of Materials. The understanding of their final performance needs a wider knowledge of the mechanisms of radiation damage in these materials from the atomistic scale to the macroscopic responses. New extensive campaigns are being funded to irradiate from simple elements to model alloys and finally the complex materials themselves. That sequence and its state of art will be presented One clear technique for that understanding is the Multi scale Modelling which includes simulation techniques from quantum mechanics, molecular dynamics, defects diffusion, mesoscopic modelling and finally the macroscopic constitutive relations for macroscopic analysis. However, in each one of these steps is necessary a systematic and well established program of experiments that combines the irradiation and the very detailed analysis with techniques such as Transmission Electron Microscope, Positron Annihilation, SIMS, Atom Probe, Nanoindebntation. A key aspect that wants to be presented in this work is the state of art and discussion of Irradiation Facilities for Materials studies. Those facilities goes from ion implantation sources, small accelerator, Experimental Reactors such High Flux Reactor, sophisticated Triple Beams Sources as JANNUS in France to generate at the same time displacements-hydrogen-helium, and projected very large neutron installation such as IFMIF. The role to

  12. Installation and operation of the Plantwide Fire Protection Systems and related Domestic Water Supply Systems

    International Nuclear Information System (INIS)

    1991-12-01

    A safe work environment is needed to support the Savannah River Site (SRS) mission of producing special nuclear material. This Environmental Assessment (EA) assesses the potential environmental impact(s) of adding to and upgrading the Plantwide Fire Protection System and selected related portions of the Domestic Water Supply System at SRS, Aiken, South Carolina. The following objectives are expected to be met by this action: Prevent undue threat to public health and welfare from fire at SRS; prevent undue hazard to employees at SRS from fire; prevent unacceptable delay to vital DOE programs as a result of fire at SRS; keep fire related property damage at SRS to a manageable level;, and provide an upgraded supply of domestic water for the Reactor Areas. The Reactor Areas' domestic water supplies do not meet current demand capacity due to the age and condition of the 30-year old iron piping. In addition, the water quality for these supplies is not consistent with current SCDHEC requirements. Therefore, DOE proposes to upgrade this Domestic Water Supply System to meet current demand and quality levels, as well as the needs of fire protection system improvement

  13. Modeling of materials supply, demand and prices

    Science.gov (United States)

    1982-01-01

    The societal, economic, and policy tradeoffs associated with materials processing and utilization, are discussed. The materials system provides the materials engineer with the system analysis required for formulate sound materials processing, utilization, and resource development policies and strategies. Materials system simulation and modeling research program including assessments of materials substitution dynamics, public policy implications, and materials process economics was expanded. This effort includes several collaborative programs with materials engineers, economists, and policy analysts. The technical and socioeconomic issues of materials recycling, input-output analysis, and technological change and productivity are examined. The major thrust areas in materials systems research are outlined.

  14. 23 CFR 140.908 - Materials and supplies.

    Science.gov (United States)

    2010-04-01

    ... Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if... job, less a consideration for loss in service life at 10 percent for rails, angle bars, tie plates and... measures for restoration of affected areas as required by the physical construction or by reason of safety...

  15. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  16. EXPERIMENTAL INSTALLATION FOR AN ASSESSMENT OF METHODS OF WATER SUPPLY IN AN INTERNAL COMBUSTION ENGINE

    Directory of Open Access Journals (Sweden)

    A. V. Bizhaev

    2015-01-01

    Full Text Available The water additive to fuel became one of effective ways of the solution of the main problems of the piston internal combustion engines (ICE as it reduces thermal factor of the engine, toxic emissions of exhaust products, and also increases efficiency by some operating modes. The way of fuel and air mix with water feeding in the combustion chamber has a great influence on process of combustion. Experimental installation for obtaining comparative characteristics of the main methods of water supply in the ICE combustion chamber was created. It was defined that there are two ways of water supply in the combustion chamber. At the first way water feed is carried out in the form of a water fuel emulsion which moves to the combustion chamber through a nozzle by means of the fuel pump with a high pressure. At the second way water arrives with air through the spraying element - the carburetor or a nozzle. This way is very simple in difference of emulsion feeding. The easiest way is nozzles application. It was established that the emulsion as the non-uniform highly dispersed fluid can be divide into components. Therefore it is necessary to use during the feeding system operation special emulsifiers with air for the uniformity water getting to the cylinder. The system for each nozzle opening at some point was offered. System of feedback with sensors of exhaust gases temperature in a final collector for adjustment of duration of injection was worked out. It was showed that at the developed experimental stand it is possible to carry out tests at various power modes. As result it will be possible to estimate both ways of fuel and air mix with water feeding.

  17. Influencing the central heating technologies installed in homes: The role of social capital in supply chain networks

    International Nuclear Information System (INIS)

    Wade, Faye; Shipworth, Michelle; Hitchings, Russell

    2016-01-01

    The likely installation of, and potential energy savings from, low carbon technologies in domestic buildings is not only dependent on those who fit them, but also the broader supply chains of which they are part. Despite this, the role of supply chain actors has been largely overlooked in strategies seeking to encourage the installation of more sustainable domestic heating technologies. With reference to central heating, this paper responds through an ethnographic analysis of how plumbers' merchants and sales representatives can influence the work of heating installers in the United Kingdom. It applies two dimensions of the concept of ‘social capital’: relational and structural. Relational social capital focuses on the trust, loyalty and reciprocity at play in relations, whilst structural social capital considers how the strength of tie can influence those to whom people turn for advice and support. Together, these ideas demonstrate how relationships amongst these groups can serve to influence product choice and facilitate information exchange. The paper concludes by discussing how these supply chains might be engaged with as a means of encouraging the installation of low carbon domestic technologies. - Highlights: •Ethnography is used to investigate the relationships in heating supply chains. •Social capital is seen to be an important part of these relationships. •These relationships could help in the promotion of low carbon technologies.

  18. Air intake device for at least one stand-by aggregate installed in an emergency power supply building

    International Nuclear Information System (INIS)

    Stoll, A.; Schilling, R.

    1980-01-01

    Stand-by aggregates are installed in an energency power supply building in order to ensure the cooling of nuclear power plants during accidents. In order to assure the stand-by aggregates to be supplied with combustion air also in the case of fire, each stand-by aggregate is provided with two intake pipes for the combustion air, which are horizontally lead through the building wall on the opposite sides of the energency power supply building. Fire valves are incorporated in the inlet pipes, and one of them will always close in the case of fire. (orig.) [de

  19. Principles for supplying virus-tested material.

    Science.gov (United States)

    Varveri, Christina; Maliogka, Varvara I; Kapari-Isaia, Theodora

    2015-01-01

    Production of virus-tested material of vegetatively propagated crops through national certification schemes has been implemented in many developed countries for more than 60 years and its importance for being the best virus control means is well acknowledged by growers worldwide. The two most important elements of certification schemes are the use of sensitive, reliable, and rapid detection techniques to check the health status of the material produced and effective and simple sanitation procedures for the elimination of viruses if present in candidate material before it enters the scheme. New technologies such as next-generation sequencing platforms are expected to further enhance the efficiency of certification and production of virus-tested material, through the clarification of the unknown etiology of several graft-transmissible diseases. The successful production of virus-tested material is a demanding procedure relying on the close collaboration of researchers, official services, and the private sector. Moreover, considerable efforts have been made by regional plant protection organizations such as the European and Mediterranean Plant Protection Organization (EPPO), the North American Plant Protection Organization (NAPPO), and the European Union and the USA to harmonize procedures, methodologies, and techniques in order to assure the quality, safety, and movement of the vegetatively propagated material produced around the world. © 2015 Elsevier Inc. All rights reserved.

  20. Protection of nuclear installations and materials against malevolent actions

    International Nuclear Information System (INIS)

    Aurelle, J.

    2001-01-01

    parts: an estimate of the resources required to destroy or sufficiently damage a system or function (for example, the quantity of explosives necessary); qualification of the paths leading to zones or systems deemed sensitive. 3) If need be, counter-measures are taken to protect zones for which the consequences would be unacceptable compared to the force of the aggression. Counter-measures are intended both to minimise sensitivity and make it more difficult to carry out the aggression envisaged. Several types of threats have been identified for the purposes of these studies: Internal threats involving actions taken by insiders acting alone or not; External threats involving actions by small group of attackers. Two assumptions are made when testing the ability of protection systems to counter aggressions of this type. The first involves a small team of attackers with limited resources, and the second takes into account a larger team with more sophisticated resources. Assumptions are also made as to the types of action which could be taken by malevolent workers in sensitive zones and the aggravating factors to be considered. As an example the loss of the offsite power supply could be taken into account. Acceptable consequences are taken as being those leading to levels of radioactive releases less than, or equal to, those taken into account in the facility safety case. This implies that vital zone vulnerability be reduced to a minimum so that an excellent level of protection can be provided for these areas. In the case of critical zones, the level of protection is considered on a case-by-case basis, depending on the consequences of malevolent actions. Finally, the paper will describe the concrete case of a nuclear installation. Emphasis will be paid on the defence in depth approach organized around prevention, management and mitigation measures. (author)

  1. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  2. Supply Inventory Management: Property Accountability at Research , Development, Test, and Evaluation Installations

    National Research Council Canada - National Science Library

    2002-01-01

    .... This report evaluates the Military Departments' improvement in maintaining property accountability over personal property at research, development, test, and evaluation installations, Personal...

  3. Failures in combined knowledge and material supply chains

    DEFF Research Database (Denmark)

    Koch, Christian

    2005-01-01

    by configuration by project. In such a setting creating value for the customers and the enterprises becomes dependent of the ability to organise and coordinate in the supply chains. That the configuration is not always successful can be demonstrated by studying the emergence of failures occurring in the supply......-month observation period. These were compiled and analysed. The economic consequences are calculated to be 8% of the production costs. The analysis of relations in the supply chain both shows relations to materials and knowledge chains and their interaction. Most of the failures were generated in the knowledge...... stream and then occasionally transfer into the material stream. The paper proposes initiatives to strengthen partnerships in supply chains and especially at engineer to order production. The contradiction between the permanent enterprise organisation potentially capable of handling purchasing...

  4. Proposal for the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel. Following a market survey carried out among 92 firms in fifteen Member States, a call for tenders (IT-2682/ST/LHC) was sent on 7 September 2001 to seven firms, seven consortia consisting of two firms and three consortia consisting of four firms, in twelve Member States. By the closing date, CERN had received 11 tenders from five firms and six consortia in ten Member States. The Finance Committee is invited to agree to the negotiation of a contract with RENCO (IT), the lowest compliant bidder, for the supply and installation of pipelines for the LHC accelerator tunnel for a total amount of 21 995 304 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 100%.

  5. Problems of metrological supply of carbon materials production

    International Nuclear Information System (INIS)

    Belov, G.V.; Bazilevskij, L.P.; Cherkashina, N.V.

    1989-01-01

    Carbon materials and products contain internal residual stresses and have an anisotropy of properties therefore special methods of tests are required to control their quality. The main metrological problems during development, production and application of carbon products are: metrological supply of production forms and records during the development of production conditions; metrological supply of quality control of the product; metrological supply of methods for the tests of products and the methods to forecast the characteristics of product quality for the period of quaranteed service life

  6. 78 FR 70077 - Issuance of Materials License for U.S. Army Installation Management Command

    Science.gov (United States)

    2013-11-22

    ... the Hilo Campus of the University of Hawaii on the island of Hawaii. On February 24, 2010, the ASLB... installations in Hawaii. The Army informed the NRC in November 2006 that it had discovered DU fragments at the... Barracks and Pohakuloa Training Area installations in Hawaii. Materials License SUC-1593 authorizes...

  7. Possibilities and prospects of investigation of irradiated structural and fuel materials using scanning electron microscope PHILLIPS XL 30 ESEM-TMP installed in the hot cell

    International Nuclear Information System (INIS)

    Golovanov, V. N.; Novoselov, A.E.; Kuzmin, S.V.; Yakovlev, V. V.

    2005-01-01

    Scanning electron microscope Philips XL 30 ESEM - TMP with X-ray microanalysis system INCA has been installed at SSC RF RIAR. The microscope is placed in the hot cell. Monitoring and control system is installed in the operator's room. Irradiated specimens are supplied to the hot cell through the transport terminal and installed into the microscope by manipulators. Direct contact of the personnel with radioactive materials is impossible. In addition it is developed the system of remote placement of the irradiated specimens into the specimen chamber of microscope. The system includes a stage with three seats, holders for different types of specimens and equipment for their remote loading in the holders. (Author)

  8. Construction raw materials policy and supply practices in Northwestern Europe

    NARCIS (Netherlands)

    Meulen, M.J. van der; Koopmans, T.P.F.; Pietersen, H.S.

    2003-01-01

    The present contribution is an inventory of the construction raw materials policy and supply practices in The Netherlands, Belgium, North Rhine-Westphalia, Lower Saxony, Great Britain, Norway and Denmark. The work has been commissioned by the Dutch government in order to benchmark its domestic

  9. Installation of depository for radioactive material in rocks

    International Nuclear Information System (INIS)

    Bergman, S.G.A.; Sagefors, K.I.; Aakesson, B.Aa.

    1985-01-01

    The rock outside the depository has a hollow space which is filled by elastoplastic material possible to deform. The solid body of the depository has a central vertical shaft and concentric vertical outer shafts. Between the shafts there are vertically oriented layers with tunnels for storage of waste. The tunnels slope down from the central shaft. (G.B.)

  10. Installation design of pump motor control systems for supplied of the RSG-GAS secondary raw water cooling system

    International Nuclear Information System (INIS)

    Kiswanto; Teguh Sulistyo; M-Taufik

    2013-01-01

    It has designed already of an installation of the pump motor control system for supplied of raw water to fulfil the RSG-GAS secondary cooling system. The installation design of this plant is used to supply electrical energy from PLN and 3 phase generator to operate the pump motor embedded multilevel type, capacity, Q = 30 m 3 /h; electric power, PN = 4 kW; voltage, 380V/3-/50Hz, and Y connections that can be operated manually or automatically by using the automatic transfer switch. The results obtained recapitulation total load of 4 kW, the magnitude of the nominal current of 9.5 A; kind of safety and capacity are used NFB 16 A, use of this type of cable to the control panel is PLN NYY 6 mm 2 diameter maximum current capacity of 25 A cable and use the control panel to the pump motor cable type NYY 4 mm 2 diameter maximum current capacity of 20 A. The design of the pump motor control system installation is ready to be implemented. (author)

  11. Army Installations Water Sustainability Assessment: An Evaluation of Vulnerability to Water Supply

    Science.gov (United States)

    2009-09-01

    hogs and pigs, horses and poultry . These categories represent varying levels of consumptive water use. Not all of the water that is withdrawn... dressing issues of present or future water rights. Though Army installations retain rights to any required water through the Federal reserved water

  12. Maxillary Sinus Membrane Elevation With Simultaneous Installation of Implants Without the Use of a Graft Material

    DEFF Research Database (Denmark)

    Starch-Jensen, Thomas; Schou, Søren

    2017-01-01

    OBJECTIVE: To compare implant treatment outcome after maxillary sinus membrane elevation with simultaneous installation of implants with or without the use of graft material applying the lateral window technique. MATERIALS AND METHODS: MEDLINE/PubMed, Cochrane Library, and Embase search in combin...

  13. Proposal for the award of a contract for the supply and installation of a pumping unit for gaseous helium

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of a pumping unit for gaseous helium. Following a market survey carried out among 17 firms in seven Member States, a call for tenders (IT-2930/LHC/LHC) was sent on 26 April 2001 to four firms in four Member States. By the closing date, CERN had received tenders from all firms. The Finance Committee is invited to agree to the negotiation of a contract with LEYBOLD (CH), the lowest bidder, for the supply and installation of a pumping unit for gaseous helium for a total amount of 716 600 euros (1 099 264 Swiss francs), not subject to revision, with an option for one additional pumping unit, for an additional amount of 704 000 euros (1 079 936 Swiss francs), not subject to revision, bringing the total amount to 1 420 600 euros (2 179 200 Swiss francs), not subject to revision. The above amounts in Swiss francs have been calculated using the rate of exchange applicable at the closing date of the call for tenders. The firm has indicated ...

  14. Proposal for the award of a blanket contract for the supply, installation and maintenance of the LHC access control system

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply, installation and maintenance of the LHC access control system. Following a market survey carried out among 134 firms in fifteen Member States, a call for tenders (IT-3026/TS/LHC) was sent on 22 January 2004 to eight firms and eight consortia in six Member States. By the closing date, CERN had received nine tenders from two firms and seven consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium CEGELEC CENTRE EST (FR) - CEGELEC (NL), the lowest technically compliant bidder, for the supply, installation and maintenance of the LHC access control system for a total amount not exceeding 4 600 000 euros (7 141 000 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - ...

  15. Power supply system for COMPASS tokamak re-installed at the IPP, Prague

    Czech Academy of Sciences Publication Activity Database

    Zajac, Jaromír; Pánek, Radomír; Žáček, František; Vlček, Jiří; Hron, Martin; Křivská, Alena; Hauptmann, R.; Daněk, M.; Šimek, J.; Prosek, J.

    2009-01-01

    Roč. 84, 7-11 (2009), s. 2020-2024 ISSN 0920-3796. [Symposium on Fusion Technology /25th./. Rostock, 15.09.2008-19.09.2008] Institutional research plan: CEZ:AV0Z20430508 Keywords : Compass * Power supply system * Flywheel-generator * Plasma start-up Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 1.122, year: 2009 http://dx.doi.org/10.1016/j.fusengdes.2008.11.092

  16. Wireless power transfer electric vehicle supply equipment installation and validation tool

    Science.gov (United States)

    Jones, Perry T.; Miller, John M.

    2015-05-19

    A transmit pad inspection device includes a magnetic coupling device, which includes an inductive circuit that is configured to magnetically couple to a primary circuit of a charging device in a transmit pad through an alternating current (AC) magnetic field. The inductive circuit functions as a secondary circuit for a set of magnetically coupled coils. The magnetic coupling device further includes a rectification circuit, and includes a controllable load bank or is configured to be connected to an external controllable load back. The transmit pad inspection device is configured to determine the efficiency of power transfer under various coupling conditions. In addition, the transmit pad inspection device can be configured to measure residual magnetic field and the frequency of the input current, and to determine whether the charging device has been installed properly.

  17. Tracking and Monitoring of Radioactive Materials in the Commercial Hazardous Materials Supply Chain

    International Nuclear Information System (INIS)

    Walker, Randy M.; Kopsick, Deborah A; Warren, Tracy A; Abercrombie, Robert K.; Sheldon, Frederick T; Hill, David E.; Gross, Ian G; Smith, Cyrus M.

    2007-01-01

    One of the main components of the Environmental Protection Agency's (EPA) Clean Materials Program is to prevent the loss of radioactive materials through the use of tracking technologies. If a source is inadvertently lost or purposely abandoned or stolen, it is critical that the source be recovered before harm to the public or the environment occurs. Radio frequency identification (RFID) tagging on radioactive sources is a technology that can be operated in the active or passive mode, has a variety of frequencies available allowing for flexibility in use, is able to transmit detailed data and is discreet. The purpose of the joint DOE and EPA Radiological Source Tracking and Monitoring (RadSTraM) project is to evaluate the viability, effectiveness and scalability of RFID technology under a variety of transportation scenarios. The goal of the Phase II was to continue testing integrated RFID tag systems from various vendors for feasibility in tracking radioactive sealed sources which included the following performance objectives: 1. Validate the performance of RFID intelligent systems to monitor express air shipments of medical radioisotopes in the nationwide supply chain, 2. Quantify the reliability of these tracking systems with regards to probability of tag detection and operational reliability, 3. Determine if the implementation of these systems improves manpower effectiveness, and 4. Demonstrate that RFID tracking and monitoring of radioactive materials is ready for large scale deployment at the National level. For purposes of analysis, the test scenario employed in this study utilized the real world commerce supply chain process for radioactive medical isotopes to validate the performance of intelligent RFID tags. Three different RFID systems were assessed from a shipping and packaging perspective, included varied environmental conditions, varied commodities on board vehicles, temporary staging in shipping terminals using various commodities and normal

  18. Resistance to ionizing radiations of materials installed at the CERN accelerators

    International Nuclear Information System (INIS)

    Schoenbacher, H.

    1982-01-01

    All materials installed in high energy accelerators along the lines of primary and secondary beams are exposed to ionizing radiation. This can in certain cases cause a degradation of the properties of these materials and consequently affect the good function of the installation. The author has taken at CERN large number of samples of materials in order to determine their radioresistance. Generally the organic materials and the electronic components are more sensitive to ionizing radiation. The author presents the results of these studies which concern the isolations of the cables (polyethylene, polyvinyl chloride, caoutchouc ethylene propylene, etc.), the isolations for the magnets on the base of epoxy resins, as well as other thermoresistant and thermoplastic products. The author equally presents a choice of materials and components which are used at CERN and which are resistant to radiations above an integral dose of 10 7 -10 8 Gy. (orig.)

  19. Installation of remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials

    International Nuclear Information System (INIS)

    Kato, Yoshiaki; Takada, Fumiki; Ohmi, Masao; Nakagawa, Tetsuya; Miwa, Yukio

    2008-06-01

    The remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials was installed in the JMTR hot laboratory at the first time in the world. The analyzer is used to study on IASCC (irradiation assisted stress corrosion cracking) or IGSCC (inter granular stress corrosion cracking) in reactor materials. This report describes the measurement procedure, the measured results and the operating experiences on the analyzer in the JMTR hot laboratory. (author)

  20. Security of a nuclear material in an installation is determined by how far the installation is to assure that nuclear material remains at a predetermined location

    International Nuclear Information System (INIS)

    Djoko Hari Nugroho

    2010-01-01

    This paper observed a preliminary design on nuclear material tracking system in the installation for decision making support based on multi sensor fusion that is reliable and accurate to ensure that the nuclear material remains inside the control area. Capability on decision making in the Management Information System is represented by an understanding of perception in the third level of abstraction. The second level will be achieved with the support of image analysis and organizing data. The first level of abstraction is constructed by merger between several CCD camera sensors distributed in a building in a data fusion representation. Data fusion is processed based on Wavelett approach. Simulation utilizing Matlab programming shows that Wavelett fuses multi information from sensors as well. Hope that when the nuclear material out of control regions which have been predetermined before, there will arise a warning alarm and a message in the Management Information System display. Thus the nuclear material movement time event can be obtained and tracked as well. (author)

  1. New method and installation for rapid determination of radon diffusion coefficient in various materials

    International Nuclear Information System (INIS)

    Tsapalov, Andrey; Gulabyants, Loren; Livshits, Mihail; Kovler, Konstantin

    2014-01-01

    The mathematical apparatus and the experimental installation for the rapid determination of radon diffusion coefficient in various materials are developed. The single test lasts not longer than 18 h and allows testing numerous materials, such as gaseous and liquid media, as well as soil, concrete and radon-proof membranes, in which diffusion coefficient of radon may vary in an extremely wide range, from 1·10 −12 to 5·10 −5 m 2 /s. The uncertainty of radon diffusion coefficient estimation depends on the permeability of the sample and varies from about 5% (for the most permeable materials) to 40% (for less permeable materials, such as radon-proof membranes). - Highlights: • The new method and installation for determination of radon diffusion coefficient D are developed. • The measured D-values vary in an extremely wide range, from 5×10 -5 to 1×10 -12 m 2 /s. • The materials include water, air, soil, building materials and radon-proof membranes. • The duration of the single test does not exceed 18 hours. • The measurement uncertainty varies from 5% (in permeable materials) to 40% (in radon gas barriers)

  2. Material Life Cycle Analysis for the Reduction of Waste Generation at Military Installations

    Science.gov (United States)

    2017-02-01

    Materials Management (SMM) Strategy. SMM is defined as an approach to serving human needs by using/reusing resources productively and sustainably...tributable to the product or process during its life cycle. In the case of waste management , different alternatives for reuse, recycling, and disposal—in...Installation Management (ACSIM). 2010. Qualified Recycling Program Handbook . Washington, DC: U.S. Army ACSIM, http://www.usar.army.mil/Portals/98

  3. New method and installation for rapid determination of radon diffusion coefficient in various materials.

    Science.gov (United States)

    Tsapalov, Andrey; Gulabyants, Loren; Livshits, Mihail; Kovler, Konstantin

    2014-04-01

    The mathematical apparatus and the experimental installation for the rapid determination of radon diffusion coefficient in various materials are developed. The single test lasts not longer than 18 h and allows testing numerous materials, such as gaseous and liquid media, as well as soil, concrete and radon-proof membranes, in which diffusion coefficient of radon may vary in an extremely wide range, from 1·10(-12) to 5·10(-5) m(2)/s. The uncertainty of radon diffusion coefficient estimation depends on the permeability of the sample and varies from about 5% (for the most permeable materials) to 40% (for less permeable materials, such as radon-proof membranes). Copyright © 2014. Published by Elsevier Ltd.

  4. Long term assurance of supply of raw materials

    International Nuclear Information System (INIS)

    1978-01-01

    The working group discussed the long-term assurance of uranium supply. A number of key questions is presented along with the answers given by representatives of 10 countries and by EC commission. Emphasis is laid on market stability and on the difficulties in adopting to sudden changes in the supply and demand situation

  5. Application of high-strength non-shrink cement based grouting material in nuclear power installations

    International Nuclear Information System (INIS)

    Li Zhong; Zuo Weiwei

    2011-01-01

    This paper briefly describes the related technical requirement of secondary grouting during the process of equipment installation in nuclear power projects. The method and procedure are introduced in detail from the aspects of acceptance, preparation, pouring, collecting and maintenance of the high-strength non-shrinking based pouring cement material, and the cautions during the construction is also provided. The factors affecting the quality of the field grouting is analyzed, and the measures to reduce or eliminate the micro-cracks during the process is provided. (authors)

  6. Decree of the Czechoslovak Atomic Energy Commission concerning the security protection of nuclear installations and nuclear materials

    International Nuclear Information System (INIS)

    1989-01-01

    In compliance with the Czechoslovak State Surveillance over Nuclear Safety of Nuclear Installations Act No. 28/1984, the Decree specifies requirements for assuring security protection of nuclear installations (and their parts) and of nuclear materials with the aim to prevent their abuse for jeopardizing the environment and the health and lives of people. (P.A.)

  7. Construction and equipment requirements for installations and laboratories handling unsealed radioactive materials in low and medium activity - Proposal of an Israeli standard

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Shlomo, A; Schlesinger, T; Barshad, M [Soreq Nuclear Research Center, Yavne (Israel)

    1993-10-01

    Working with unsealed radioactive materials involves risks of internal or external exposure to ionizing radiation. Exposure of human beings to ionizing radiation involves adverse health effects and must be prevented or at least reduced to reasonable levels. Radiation sources in this work are unsealed radioactive materials, that may be solids, liquid or in gaseous states, and in varying toxic levels. Various works and actions that are performed on the unsealed radioactive materials have varying potentials of dispersion, contamination and exposure, so that the combination of the type of work activity, isotope characteristics and physical state dictate the internal and external exposure risks. In order to limit the exposure of the personnel of installations and laboratories which deals with unsealed radioactive materials, national and international authorities and organizations standards and procedures for the requirements of construction and equipment of such installations and laboratories. This document means to be a proposal for an Israeli standard requirements for equipment and construction of installations working with low and medium activity unsealed radioactive materials. The targets for defining the, construction and equipment, requirements are: a. Safety and proper protection of personnel and public from external and internal exposure while the work is done properly. Proper protection against the risk of contaminating the environment. c. Standardization of requirements. d. Proper design of installations and laboratories. e. Supply means for evaluation and reduction of construction costs.The equipment detailed here refers to fixed (none movable) equipment which is a part of the construction of the laboratory or installation, unless specified otherwise. The document starts with a review of the recommendations of some international organizations (WHO, IAEA, NRPB) for construction and equipment requirements for these laboratories and installations. Then the

  8. Chapter No.5. Nuclear materials and physical protection of nuclear installations

    International Nuclear Information System (INIS)

    2002-01-01

    The State System of Accounting for and Control of Nuclear Material (SSAC) is based on requirements resulting from the Safeguards Agreement between the Government of the Slovak Republic and the IAEA. UJD performs this activity according to the 'Atomic Act' and relevant decree. The purpose of the SSAC is also to prevent unauthorised use of nuclear materials, to detect loses of nuclear materials and provide information that could lead to the recovery of missing material. The main part of nuclear materials under jurisdiction of the Slovak Republic is located at NPP Jaslovske Bohunice, NPP Mochovce and at interim storage in Jaslovske Bohunice. Even though that there are located more then 99% of nuclear materials in these nuclear facilities, there are not any significant problems with their accountancy and control due to very simply identification of accountancy units - fuel assemblies, and due to stability of legal subjects responsible for operation and for keeping of information continuity, which is necessary for fulfilling requirements of the Agreement. The nuclear material located outside nuclear facilities is a special category. There are 81 such subjects of different types and orientations on the territory of the Slovak Republic. These subjects use mainly depleted uranium as a shielding and small quantity of natural uranium, low enrichment uranium and thorium for experimental purposes and education. Frequent changes of these subjects, their transformations into the other subjects, extinction and very high fluctuation of employees causes loss of information about nuclear materials and creates problems with fulfilling requirements resulting from the Agreement. In 2001, the UJD carried out 51 inspections of nuclear materials, of which 31 inspections were performed at nuclear installations in co-operation with the IAEA inspectors. No discrepancies concerning the management of nuclear materials were found out during inspections and safeguards goals in year 2001 were

  9. SUSTAINABILITY OF SHORT FOOD SUPPLY CHAINS: ANALYSIS OF RAW MATERIAL SUPPLY IN MILAN PUBLIC SCHOOL CATERING

    Directory of Open Access Journals (Sweden)

    G. D’Anna

    2009-09-01

    Full Text Available The demand of short food supply chains is becoming more pressing by consumers, especially in the largest school catering. The implementation of the short chain in a large catering company of Milan, is described in this practical contribution. Several aspects of short food chains sustainability: legal, commercial and economic sustainability, hygienic and gastronomic sustainability, are discussed.

  10. Managing the risks of the backfill production line from material acquisition to installation

    International Nuclear Information System (INIS)

    Kiviranta, Leena; Kumpulainen, Sirpa; Keto, Paula; Autio, Jorma; Siivonen, Markku; Koho, Petri

    2012-01-01

    Document available in extended abstract form only. The tunnel backfill of Finnish KBS-3V type repository for spent nuclear fuel consists of foundation layer that is installed at site, pre-compacted backfill blocks that fill most of the tunnel and bentonite pellets to fill the gap between blocks and tunnel wall. In order to ensure the quality, availability, and timely delivery of backfill materials and components, and further to ensure the fulfillment of the requirements and specifications set for backfilling of deposition tunnels, the backfill production line was explored step-by-step, and risks related were defined and analyzed. The work described in this paper was initiated by Posiva Oy and is reported in Keto et al. (2012). The first part of the backfill production line is described in Figure 1 for Friedland clay that is designed to be used for the backfill blocks. It consists of excavation, processing and delivery of materials to backfill production facility. Second part of the production line consists of manufacturing of the backfill components, and the third part is the installation. A preliminary risk assessment was done in 2011 for the acquisition of Friedland clay and manufacturing and installation of foundation layer, blocks and pellets. The critical points of the production line were determined using a material flow description where risk is defined as a probability of something unwanted to happen times the severity of the consequences. Risk analysis was performed by going through the whole backfill production line step by step and analyzing all the incidents, which have occurred (or might occur) during the backfilling operations. A risk number from 1 to 25 was given to each step of the chain depending on how long delay the problem causes and how often it occurs. Low risk was the target for each step of the chain, medium risk was considered tolerable, for high risks management actions to decrease the risk number were considered and extremely high risks

  11. Vulnerabilities and rupture risk in the supply of materials and medicine on the supply chain in the Public Hospital

    Directory of Open Access Journals (Sweden)

    Lilian de Fátima Silva

    2018-06-01

    Full Text Available Constant disruptions in the hospital supply chain caused by various sources of risk and vulnerability have been identified. This article aims to identify and analyze the main vulnerabilities that cause rupture risk in the supply of materials and medicines, on the supply chain in a public hospital in the city of Belo Horizonte. From qualitative research, we interviewed ten employees of the hospital and five suppliers. The interview script used was adapted from the model proposed by Mason-Jones and Towill (1988 and adapted by Bastos Junior (2007. As part of the results, it is possible to mention the risks of supply and the processes risk as being among those which were of more concern to the employees and the supply risks and control risk of more concern in the suppliers vision. It is inferred that more investment is necessary in the hospital supply chain management, given that the processes are based on the reaction to the risks rather than their prevention.

  12. The changing logistical system of the building materials supply chain

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2000-01-01

    This study analyses how policy measures and technological developments affect the trade-offs between elements of the logistical system of a supply chain. It is assumed that this logistical system consists of the following elements: sourcing, production, inventory, transportation and service. Two

  13. Peculiarities of physical protection assurance of the nuclear materials at nuclear installation decommissioning stage

    International Nuclear Information System (INIS)

    Pinchuk, M.G.

    2001-01-01

    On December 15, 2000 Unit 3 of Chernobyl NPP, which is the last one in Ukraine having RBMK-type reactor, was permanently shutdown before the end of its lifetime. A number of projects related to establishing infrastructure for the plant decommissioning are being implemented in compliance with the Ukraine's commitments. Decommissioning stage includes activities on fuel unloading from the cores of Unit I and Unit 3, fuel cooling in the ponds followed by the fuel transportation to the spent fuel dry storage facility (currently under construction) for its safe long-term storage. Special facilities are being created for liquid and solid radioactive waste treatment. Besides, it is planned to implement a number of projects to convert Shelter Object in environmentally safe structure. Physical protection work being an essential part of the nuclear material management is organized in line with the recommendations of the IAEA, and the Laws of Ukraine 'On Nuclear Energy Utilization and Radiation Safety', 'On Physical Protection of Nuclear Installations and Materials', 'Regulations on Physical Protection of Nuclear Materials and Installations', other codes and standards. While organizing physical protection on ChNPP decommissioning stage we have to deal with some specific features, namely: Significant amount of fuel assemblies, which are continuously transferred between various storage and operation facilities; Big amount of odd nuclear material at Shelter Object; 'Theft of new fuel fragments from the central hall of the Shelter Object in 1995 with the intention of their further sale. The thieves were detained and sentenced. The stolen material was withdrawn, that prevented its possible proliferation and illicit trafficking. At present physical protection of ChNPP does not fully satisfy the needs of the decommissioning stage and Ukraine's commitments on non-admission of illicit trafficking. Work is carried out, aimed to improve nuclear material physical protection, whose main

  14. Defending the Military Food Supply Acquisition, Preparation, and Protection of Food at U.S. Military Installations

    Science.gov (United States)

    2009-09-01

    former KGB official, with polonium - 210 in 2006.25 However, a number of factors make radiological contamination of food unlikely. First, it is...Defense University September 2009 Defending the Military Food Supply Acquisition, Preparation, and Protection of Food at U.S. Military...DATE SEP 2009 2. REPORT TYPE 3. DATES COVERED 00-00-2009 to 00-00-2009 4. TITLE AND SUBTITLE Defending the Military Food Supply Acquisition

  15. Raw material supply: challenge and chance for economy and state

    Energy Technology Data Exchange (ETDEWEB)

    Casper, W

    1976-01-01

    The imprint left by the 1973 oil embargo makes all nations aware of their dependence upon this and other raw materials. The author says the brunt of the embargo has dealt a heavier blow than has been realized on industrial nations and developing countries alike. The drastic decline of raw material prices has had threatening consequences for a number of raw-material-producing developing countries, making some nations unite for the purpose of market regulation. The cartel-like union of copper-producing countries is cited; producers of bauxite, iron ore, and tungsten have united; and some producers of tin have united. So far, the attempt to apply the oil strategy to other raw materials has not achieved the desired results; however, raw materials are no longer just a phase of the industrial process but have become a political matter of prime importance. (MCW)

  16. A stakeholder analysis of divergent supply-chain trends for the European onshore and offshore wind installations

    International Nuclear Information System (INIS)

    Wüstemeyer, Christoph; Madlener, Reinhard; Bunn, Derek W.

    2015-01-01

    This paper provides a survey-based analysis of investment decisions and structural shifts related to onshore and offshore wind power supply chains. Insights on cost reductions are obtained from a detailed stakeholder survey conducted amongst the European wind power industry in 2012. Overall, a rather more optimistic view of the scope for cost reductions in offshore technology is presented than has previously been evident in empirical analysis. From the analysis we conclude that the wind power industry has experienced a decoupling process of the offshore supply chain from its onshore counterpart with diverging technological requirements. For policy-makers, it is essential to acknowledge that barriers to adoption and the consequent needs for subsidies among the players in the onshore and offshore supply chains seem to differ, and that a micro-level analysis of the innovations and risks involved at the various stages in the supply chain is necessary. - Highlights: • Survey-based analysis of supply chain trends in the European wind energy industry. • Study of technology adoption decisions, structural shifts, and cost projections. • Results reveal a decoupling process between onshore and offshore supply chains. • Possibilities to transfer knowledge from the onshore to the offshore product vary. • The divergent barriers to adoption need to be accounted for by policy-makers

  17. Supply of equipment and components, materials of dedicated commercial grade, other services

    International Nuclear Information System (INIS)

    Perdices, D.; Perez Medina, E.

    2014-01-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  18. Materials Challenges and Testing for Supply of Energy and Resources

    CERN Document Server

    Bollinghaus, Thomas

    2012-01-01

    One major goal of the World Materials Research Institute Forum - WMRIF is to promote young scientists in the field of materials science and engineering. To enhance the international knowledge exchange between young postdoctoral scientists all over the world, WMRIF meanwhile regularly organizes joint workshops among the member institutes. These workshops also represent an increasingly appreciated platform to get known to each other and to build co-operations. For such workshops, various topics are selected, pointing to future perspectives and challenges in the field of Materials Science and Eng

  19. Optimum Installation of Sorptive Building Materials Using Contribution Ratio of Pollution Source for Improvement of Indoor Air Quality.

    Science.gov (United States)

    Park, Seonghyun; Seo, Janghoo

    2016-04-01

    Reinforcing the insulation and airtightness of buildings and the use of building materials containing new chemical substances have caused indoor air quality problems. Use of sorptive building materials along with removal of pollutants, constant ventilation, bake-out, etc. are gaining attention in Korea and Japan as methods for improving such indoor air quality problems. On the other hand, sorptive building materials are considered a passive method of reducing the concentration of pollutants, and their application should be reviewed in the early stages. Thus, in this research, activated carbon was prepared as a sorptive building material. Then, computational fluid dynamics (CFD) was conducted, and a method for optimal installation of sorptive building materials was derived according to the indoor environment using the contribution ratio of pollution source (CRP) index. The results show that a method for optimal installation of sorptive building materials can be derived by predicting the contribution ratio of pollutant sources according to the CRP index.

  20. The Supply Chain Triangle: How Synchronisation, Stability, and Productivity of Material Flows Interact

    Directory of Open Access Journals (Sweden)

    Florian Klug

    2013-01-01

    Full Text Available Empirical evidence created a commonly accepted understanding that synchronisation and stability of material flows impact its productivity. This crucial link between synchronous and stable material flows by time and quantity to create a supply chain with the highest throughput rates is at the heart of lean thinking. Although this supply chain triangle has generally been acknowledged over many years, it is necessary to reach a finer understanding of these dynamics. Therefore, we will develop and study supply chains with the help of fluid dynamics. A multistage, continuous material flow is modelled through a conservation law for material density. Unlike similar approaches, our model is not based on some quasi steady-state assumptions about the stochastic behaviour of the involved supply chain but rather on a simple deterministic rule for material flow density. These models allow us to take into account the nonlinear, dynamical interactions of different supply chain echelons and to test synchronised and stable flow with respect to its potential impacts. Numerical simulations verify that the model is able to simulate transient supply chain phenomena. Moreover, a quantification method relating to the fundamental link between synchronisation, stability, and productivity of supply chains has been found.

  1. Case Study Analysing Potentials to Improve Material Efficiency in Manufacturing Supply Chains, Considering Circular Economy Aspects

    Directory of Open Access Journals (Sweden)

    Anja T. Braun

    2018-03-01

    Full Text Available In order to decouple economic growth from global material consumption it is necessary to implement material efficiency strategies at the level of single enterprises and their supply chains, and to implement circular economy aspects. Manufacturing firms face multiple implementation challenges like cost limitations, competition, innovation and stakeholder pressure, and supplier and customer relationships, among others. Taking as an example a case of a medium-sized manufacturing company, opportunities to realise material efficiency improvements within the company borders—on the supply chain and by using circular economy measures—are assessed. Deterministic calculations and simulations, performed for the supply chain of this company, show that measures to increase material efficiency in the supply chain are important. However, they need to be complemented by efforts to return waste and used products to the economic cycle, which requires rethinking the traditional linear economic system.

  2. Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

    CERN Document Server

    2017-01-01

    Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

  3. Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

    CERN Document Server

    2012-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

  4. The Material Supply Adjustment Process in RAMF-SM, Step 2

    Science.gov (United States)

    2016-06-01

    I N S T I T U T E F O R D E F E N S E A N A L Y S E S The Material Supply Adjustment Process in RAMF-SM, Step 2 Eleanor L. Schwartz James S...5564 The Material Supply Adjustment Process in RAMF-SM, Step 2 Eleanor L. Schwartz James S. Thomason, Project Leader This page is intentionally blank...9 1. Inputs and Outputs .......................................................................................10 2. Specific Steps of the PEAP

  5. IMPROVING THE SYSTEM OF RAW MATERIAL SUPPLY OF THE MEAT INDUSTRY

    Directory of Open Access Journals (Sweden)

    A. M. Bukreev

    2013-01-01

    Full Text Available The article describes the characteristics of the process of improving the system raw materials supply of meat industry and presents the main factors, criteria, principles and algorithm rational distribution of the meat industry. The relevance of the research topic, in a globalized economy and Russia's accession to the WTO, caused by necessity to improve the system of raw material supply domestic enterprises and enhancing food security.

  6. Supply of avocado starch (Persea americana mill) as bioplastic material

    Science.gov (United States)

    Ginting, M. H. S.; Hasibuan, R.; Lubis, M.; Alanjani, F.; Winoto, F. A.; Siregar, R. C.

    2018-02-01

    The purpose of this study was to determine the effect of time precipitation of avocado slurry seed to yield of starch. Starch analysis included starch content, moisture content, amylose content, amylopectin content, ash content, protein content, fat content, Fourier transform infra red analysis and rapid visco analyzer. Supply of starch from avocado seeds was used by extraction method. Every one hundred grams of avocado slurry was precipitated by gravity with variations for 4 hours, 8 hours, 12 hours, 16 hours, 20 hours and 24 hours. The Starch yield was washed, and dried using oven at 70°C for 30 minutes. Starch yield was the highest as 24.20 gram at 24 hours. The result of starch characterization was 73.62%, water content 16.6%, amylose 0.07%, amylopectin 73.55%, ash content 0.23%, protein content 2.16%, fat content 1.09%. Rapid visco analyzer obtained at 91.33°C of gelatinization temperature. Scanning electron microscopy analyzes obtained 20 μm oval-shaped starch granules. Fourier Transform Infra Red analysis of starch obtained the peak spectrum of O-H group of alcohols, C-H alkanes and C-O ether.

  7. Bank of models of hydrogen diffusion in irradiated materials for nuclear and thermonuclear installation

    International Nuclear Information System (INIS)

    Chikhraj, E.V.; Tazhibaeva, I.L.; Shestakov, V.P.; Romanenko, O.G.; Klepikov, A.Kh.

    1996-01-01

    The programs for calculation of one-dimensional hydrogen distribution in diffusion media with traps are proposed. The programs have been described by the differential equations in partial derivatives, taking into account presence of convertible chemical reaction of the first order (model by Hurst-Gauss), presence of convertible chemical reaction of the second order (model by MacNabb and Forster) or presence of two different interchanging diffusion channels with traps under boundary conditions of first, second and third kinds. Programs allows to calculate and to show dynamic distribution and its flow in diffusion media and traps along the sample (both uniform and consisting of several different layers, distinguished by media structure and phase composition) in experiment on hydrogen permeability and thermodesorption. Conditions of flow continuity takes place on the borders of section layers. Code for resolving of inversive problem - extraction of diffusion parameters from an experimental curve of a gas permeation flow for specified above tree models of diffusion is developed also. The programs a written in Pascal in variants for DOS and for Windows-95. The programs could be applied for the analysis of gas release results being obtained from the structural materials samples of nuclear-power installation. 6 refs

  8. A reference device for evaluating the thermal behavior of installed multilayered wall containing a phase change material

    International Nuclear Information System (INIS)

    Pagliolico, S.L.; Sassi, G.; Cascone, Y.; Bongiovanni, R.M.

    2015-01-01

    Highlights: • Thermal analysis of installed wallboards embedding phase change material layer. • Simple devices and real conditions for thermal analysis toward a standardization. • Scanning calorimetric measurements as initial condition for data regression. • Bias correction of calorimetric measurements data by installation factors. • Practical approach to identify a reliable thermal curve for capacitive wallboards. - Abstract: Thermal inertia of lightweight building envelopes can be improved including phase change materials in multilayered wallboards. The thermal modeling of buildings for design purposes needs a robust description of the thermal properties of installed phase change materials. A standard method would improve the thermal characterization of commercial products. The aim of the study is to develop a simple methodology to obtain reliable thermal data for phase change materials integrated in multilayered wallboards. The methodology modifies differential scanning calorimetry measurements on phase change material by installation factors to obtain the apparent specific heat vs. temperature for the wallboard layer embedding phase change material. Simple cubic cells were realized as reference devices to simulate a confined environment. A dynamic model of heat transfer was developed to simulate the thermal behavior of devices. Installation factors were calculated by regression of the monitored temperatures inside and outside the devices operating under real environmental conditions. The apparent specific heat of phase change material, measured by differential scanning calorimetry at different rates, resulted in a spread of curves vs. temperature. Mean curves were used as initial condition for regression. The mean calculation method did not significantly affect the installed resulted curve. A unique curve of apparent specific heat vs. temperature best fit data measured over a wide range of experimental devices and conditions. Good regression

  9. Experimental study of the density distribution of the particles of the material in screw installation

    Directory of Open Access Journals (Sweden)

    Demidov S. F.

    2017-02-01

    Full Text Available the experimental studies of density distribution of the particles of a mixture of wheat, oats, rye to feed pigs by infrared heating at the time of stay and temperature at the exit of the installation. The purpose of the work is to study the quality of treatment of the product with the settings with the screw and the screw with installed round jumper on the pen of the screw. Screw installations with infrared emitters of selected wavelength give the opportunity for intense and continuous heat treatment process. The authors used the optimal parameters of the process with the screw and the screw with installed round jumper on the pen of the screw. The parameters of screw installation during the study were the following: the number of revolutions of the screw was 10 rpm, density of heat flux was 12 kW/m2, output capacity – 250 kg/h.

  10. Causes of shortage and delay in material supply: a preliminary study

    Science.gov (United States)

    Rahman, M. M.; Yap, Y. H.; Ramli, N. R.; Dullah, M. A.; Shamsuddin, M. S. W.

    2017-11-01

    Shortage and delay in materials supply is argued to be one of the most important factors that lead to delay in construction project delivery globally. However, the relevant underlying reasons vary from country to country. As such, this paper summarises the outcomes of a study that targeted identifying causes of shortage and delay in materials supply in Brunei Darussalam. The study was conducted through fifteen semi-structured interviews of contractors and materials suppliers in Brunei. The study identified six causes of shortageof materials and nine causes of delay in materials supply in Brunei. The most importantcausefor shortage of materials relates to the origin or availability of construction materials. On the other hand, the most influential cause of delay in material supply was found to be poor materials procurement and inventory management system, which has other underlying reasons such as late identification of the type of materials needed. The observations are expected to help in formulating or reviewing relevant policies, in order to ensure on-time project delivery.

  11. EFFICIENCY OF RAW MATERIAL INVENTORIES IN IMPROVING SUPPLY CHAIN PERFORMANCE of CV. FIVA FOOD

    Directory of Open Access Journals (Sweden)

    Artadi Nugraha

    2016-01-01

    Full Text Available The production and number of processed food industries have slightly increased; as a result, the companies must compete to maximize their profits by conducting their efficient production process. CV. Fiva Food is one of the companies in the field of processed foods, especially in processed meat that has implemented supply chain management. It is necessary for the company to take measurements of its performance and efficiency for the entire supply chain such as procurement of raw materials. The purposes of this study were to analyze the performance of the company's supply chain and determine the most efficient  method of procurement for its raw materials as well as and to provide recommendations for the company to improve its performance of entire supply chain. This study used SCOR in analyzing the performance of supply chain and EOQ and POQ method to be compared with the method that the company uses to determine which method of procurement for raw materials is the most efficient one. The result showed that based on the matrix, the company's performance is unfavorable when it was compared to the benchmark performance of inventory days of supply. In addition, this study showed that the POQ method produces the lowest total inventory cost with savings of Rp6.647.015 for raw materials of MDM whereas EOQ method produced the lowest total inventory cost with savings of Rp222.153,78 for raw materials of FQ85CL. Keywords: performance suppy chain, SCOR, fiva food, EOQ, POQ

  12. Proposal for the award of a contract for the supply and installation of prefabricated reinforced-concrete modules for an LHC access shaft

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply and installation of 33 prefabricated reinforced-concrete modules for the PX15 access shaft. Following a market survey carried out among 39 firms in fourteen Member States, a call for tenders (IT-2714/ST/LHC) was sent on 22 May 2000 to seven firms and one consortium consisting of four firms in seven Member States. By the closing date, CERN had received five tenders from four firms and one consortium in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium JOINT VENTURE CCC (CH-DE-AT), the lowest bidder after realignment, for the supply and installation of prefabricated reinforced-concrete modules for the PX15 access shaft for a total amount of 988 915 Swiss francs, not subject to revision. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE-89%; CH-6%; AT-5%.

  13. Proposal for the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS experiment

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS Experiment. Following a market survey carried out among 22 firms in seven Member States and seven firms in two non-Member States, a call for tenders (IT-2576/EP/CMS) was sent on 17 February 1999 to two firms in two Member States and one firm in one non-Member State. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE (FR), the lowest bidder, for the supply and installation of a cryogenic helium refrigeration system for an amount of 4 552 500 euros, subject to revision, with an option for one liquid nitrogen dewar and a one-year extension of the warranty period, for an amount of 205 000 euros, subject to revision, bringing the total amount to 4 757 500 euros. At the rate of exchange given in the tender, this amount is equal to 7 612 000 Swiss francs. This procurement will be financed by...

  14. Proposal for the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system. Following a market survey carried out among 61 firms in ten Member States and 14 firms in three non-Member States, a call for tenders (IT-2624/EP/ATLAS) was sent on 19 April 2002 to four firms and three consortia in six Member States and two firms in one non-Member State. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE ITALIA (IT), the lowest bidder, for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system for a total amount not exceeding 2 840 000 euros (4 191 300 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. This procurement will be financed by the ATLAS Common Fund and CERN's contribution will not exceed 8...

  15. Proposal for the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC. Following a market survey carried out among 42 firms in ten Member States, a call for tenders (IT-2722/LHC/LHC) was sent on 10 August 2000 to seven firms and three consortia, consisting of two firms each, in seven Member States. By the closing date, CERN had received five tenders from three firms and two consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm COSMI (IT), the lowest bidder fulfilling the technical requirements, for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for a total amount of 3 514 779 euros, (5 307 329 Swiss francs), not subject to revision, with options for additional equipment for heating the adsorber bed and additional heat exchanger/condenser equipment, for an additional amount of 80 081 euros (120 923 Swiss fra...

  16. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  17. Proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC

    CERN Document Server

    2003-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to the existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC with the firm DEMONT (IT) for an amount exceeding the previously approved amount of 3 818 877 euros (5 881 000 Swiss francs) by up to 2 157 800 euros (3 323 000 Swiss francs), subject to revision for inflation, bringing the total contract amount to a maximum amount of 5 976 677 euros (9 204 000 Swiss francs), subject to revision for inflation. The rate of exchange used is that stipulated in the initial tender (CERN/FC/4322). The firm has declared the following origin of the equipment covered by this adjudication proposal: IT - 85%, CZ - 5%, SK - 4%, FR - 3%, PL - 3%.

  18. Proposal for the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment. Following a market survey carried out among 54 firms in ten Member States, a call for tenders (IT-3090/ST) was sent on 29 August 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium HEKATRON (DE) - SOTEB (FR), the lowest bidder, for the supply and installation of automatic fire-detection and emergency-evacuation equipment for a total amount not exceeding 1 900 000 euros (2 946 650 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 70%; FR - 30%.

  19. MATERIAL SUPPLY AND MAGNETIC CONFIGURATION OF AN ACTIVE REGION FILAMENT

    Energy Technology Data Exchange (ETDEWEB)

    Zou, P.; Fang, C.; Chen, P. F.; Yang, K.; Hao, Q. [School of Astronomy and Space Science, Nanjing University, Nanjing 210023 (China); Cao, Wenda, E-mail: fangc@nju.edu.cn [Big Bear Solar Observatory, New Jersey Institute of Technology, 40386 North Shore Lane, Big Bear City, CA 92314 (United States)

    2016-11-10

    It is important to study the fine structures of solar filaments with high-resolution observations, since it can help us understand the magnetic and thermal structures of the filaments and their dynamics. In this paper, we study a newly formed filament located inside the active region NOAA 11762, which was observed by the 1.6 m New Solar Telescope at Big Bear Solar Observatory from 16:40:19 UT to 17:07:58 UT on 2013 June 5. As revealed by the H α filtergrams, cool material is seen to be injected into the filament spine with a speed of 5–10 km s{sup -1}. At the source of the injection, brightenings are identified in the chromosphere, which are accompanied by magnetic cancellation in the photosphere, implying the importance of magnetic reconnection in replenishing the filament with plasmas from the lower atmosphere. Counter-streamings are detected near one endpoint of the filament, with the plane-of-the-sky speed being 7–9 km s{sup -1} in the H α red-wing filtergrams and 9–25 km s{sup -1} in the blue-wing filtergrams. The observations are indicative that this active region filament is supported by a sheared arcade without magnetic dips, and the counter-streamings are due to unidirectional flows with alternative directions, rather than due to the longitudinal oscillations of filament threads as in many other filaments.

  20. 47 CFR 36.181 - Material and supplies-Account 1220.

    Science.gov (United States)

    2010-10-01

    ... JURISDICTIONAL SEPARATIONS PROCEDURES; STANDARD PROCEDURES FOR SEPARATING TELECOMMUNICATIONS PROPERTY COSTS... Material and Supplies and Cash Working Capital § 36.181 Material and supplies—Account 1220. (a) The amount included in Account 1220 is apportioned among the operations on the basis of the apportionment of the cost...

  1. Robust optimal control of material flows in demand-driven supply networks

    NARCIS (Netherlands)

    Laumanns, M.; Lefeber, A.A.J.

    2006-01-01

    We develop a model based on stochastic discrete-time controlleddynamical systems in order to derive optimal policies for controllingthe material flow in supply networks. Each node in the network isdescribed as a transducer such that the dynamics of the material andinformation flows within the entire

  2. Importance and possibilities of secondary cycles (recycling), substitution and innovation in mineral raw and primary material supply

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Part 1-4 of the series ''The basis of raw materials supply'' is intended to bring about a better understanding of the ''Concept for the supply of Austria with mineral raw- and primary materials''. Part 3 deals with recovery of raw material from old- and waste material as an important contribution to an extension of the supply's basis and to an improvement of raw material utilization.

  3. Nanotechnology and clean energy: sustainable utilization and supply of critical materials

    Energy Technology Data Exchange (ETDEWEB)

    Fromer, Neil A., E-mail: nafromer@caltech.edu [California Institute of Technology, Resnick Sustainability Institute (United States); Diallo, Mamadou S., E-mail: diallo@wag.caltech.edu [Korea Advanced Institute of Science and Technology (KAIST), Graduate School of Energy, Environment, Water and Sustainability (EEWS) (Korea, Republic of)

    2013-11-15

    Advances in nanoscale science and engineering suggest that many of the current problems involving the sustainable utilization and supply of critical materials in clean and renewable energy technologies could be addressed using (i) nanostructured materials with enhanced electronic, optical, magnetic and catalytic properties and (ii) nanotechnology-based separation materials and systems that can recover critical materials from non-traditional sources including mine tailings, industrial wastewater and electronic wastes with minimum environmental impact. This article discusses the utilization of nanotechnology to improve or achieve materials sustainability for energy generation, conversion and storage. We highlight recent advances and discuss opportunities of utilizing nanotechnology to address materials sustainability for clean and renewable energy technologies.

  4. Nanotechnology and clean energy: sustainable utilization and supply of critical materials

    International Nuclear Information System (INIS)

    Fromer, Neil A.; Diallo, Mamadou S.

    2013-01-01

    Advances in nanoscale science and engineering suggest that many of the current problems involving the sustainable utilization and supply of critical materials in clean and renewable energy technologies could be addressed using (i) nanostructured materials with enhanced electronic, optical, magnetic and catalytic properties and (ii) nanotechnology-based separation materials and systems that can recover critical materials from non-traditional sources including mine tailings, industrial wastewater and electronic wastes with minimum environmental impact. This article discusses the utilization of nanotechnology to improve or achieve materials sustainability for energy generation, conversion and storage. We highlight recent advances and discuss opportunities of utilizing nanotechnology to address materials sustainability for clean and renewable energy technologies

  5. Nanotechnology and clean energy: sustainable utilization and supply of critical materials

    Science.gov (United States)

    Fromer, Neil A.; Diallo, Mamadou S.

    2013-11-01

    Advances in nanoscale science and engineering suggest that many of the current problems involving the sustainable utilization and supply of critical materials in clean and renewable energy technologies could be addressed using (i) nanostructured materials with enhanced electronic, optical, magnetic and catalytic properties and (ii) nanotechnology-based separation materials and systems that can recover critical materials from non-traditional sources including mine tailings, industrial wastewater and electronic wastes with minimum environmental impact. This article discusses the utilization of nanotechnology to improve or achieve materials sustainability for energy generation, conversion and storage. We highlight recent advances and discuss opportunities of utilizing nanotechnology to address materials sustainability for clean and renewable energy technologies.

  6. Transportation flow analysis in a centralised supply chain at Toyota Material Handling Europe

    OpenAIRE

    Gustavsson, Styrbjörn; Öberg, Mikael

    2010-01-01

    This report is the result of a Master Thesis written at Toyota Material Handling Europe (TMHE), with the purpose to map the existing spare part supply chain structure and to analyse future suggested supply chain structures with a focus on transportation flows. TMHE is one of the world’s largest producing forklift distributers with large market shares throughout Europe. Besides the main activity of forklifts the aftermarket of distributing spare parts is a major business. With a current decent...

  7. Evolutional Optimization on Material Ordering and Inventory Control of Supply Chain through Incentive Scheme

    Science.gov (United States)

    Prasertwattana, Kanit; Shimizu, Yoshiaki; Chiadamrong, Navee

    This paper studied the material ordering and inventory control of supply chain systems. The effect of controlling policies is analyzed under three different configurations of the supply chain systems, and the formulated problem has been solved by using an evolutional optimization method known as Differential Evolution (DE). The numerical results show that the coordinating policy with the incentive scheme outperforms the other policies and can improve the performance of the overall system as well as all members under the concept of supply chain management.

  8. An outbreak of Campylobacter enteritis associated with a community water supply on a U.S. military installation.

    Science.gov (United States)

    DeFraites, Robert F; Sanchez, Jose L; Brandt, Cynthia A; Kadlec, Robert P; Haberberger, Richard L; Lin, Jenny J; Taylor, David N

    2014-11-01

    An outbreak of acute gastroenteritis involving 249 persons, 32% of whom were hospitalized, occurred on a U.S. Army installation in 1990. Campylobacter jejuni was isolated from 81 of 163 (50%) persons cultured. Seventeen isolates of C. jejuni available for serotyping were Lior serotype 5. The outbreak remained restricted to one recruit barracks area and adjacent Junior Reserve Officer Training Corps cadet barracks. Infection of sequential cohorts of recruits over an interval of 3 weeks suggested a continuing or intermittent common source. Contaminated food was not implicated because affected persons ate at separate dining facilities and other facilities with the same food sources had no associated illnesses. There was a strong association between the amount of water consumed by recruits and risk of diarrhea (chi-square test for trend, pwater collected in the affected area had no residual chlorine and when cultured yielded greater than 200 colonies of coliform bacteria per 100 mL of water sampled. Although Campylobacter was not isolated from water, living and dead birds were found in an elevated water storage tank providing drinking water to the affected area. This and other similar outbreaks indicate that contamination of water storage tanks can lead to large outbreaks of Campylobacter enteritis.

  9. Design, fabrication and installation of irradiation facilities -Advanced nuclear material development-

    International Nuclear Information System (INIS)

    Kim, Yong Seong; Lee, Jeong Yeong; Lee, Seong Ho; Ji, Dae Yeong; Kim, Seok Hoon; An, Seong Ho; Kim, Dong Hoon; Seok, Ho Cheon; Kim, Joon Yeon; Yang, Seong Hong

    1994-07-01

    The objective of this study is to design and construct the steady state fuel test loop and non-instrumented capsules to be installed in KMRR. The principle contents of this project are to design, fabricate the steady-state fuel test loop and non-instrumented capsule to be installed in KMRR for nuclear technology development. This project will be completed in 1996, so preparation of design criteria for fuel test loop have been performed in 1993 as the first year of the first phase in implementing this project. Also design and pressure drop test of non-instrumented capsule have been performed in 1993

  10. Providing for energy efficiency in homes and small buildings. Part III. Determining which practices are most effective and installing materials

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    The training program is designed to educate students and individuals in the importance of conserving energy and to provide for developing skills needed in the application of energy-saving techniques that result in energy-efficient buildings. A teacher guide and student workbook are available to supplement the basic manual. Subjects covered in Part III are: determining which practices are most efficient and economical; installing energy-saving materials; and improving efficiency of equipment.

  11. Eco-efficient concretes: the effects of using recycled ceramic material from sanitary installations on the mechanical properties of concrete.

    Science.gov (United States)

    Guerra, I; Vivar, I; Llamas, B; Juan, A; Moran, J

    2009-02-01

    The aim of this research was to investigate some of the physical and mechanical properties of concrete mixed under laboratory conditions, where different proportions of coarse aggregate materials were substituted by porcelain from sanitary installations. The results of the tests show that the concrete produced has the same mechanical characteristics as conventional concrete, thus opening a door to selective recycling of sanitary porcelain and its use in the production of concrete.

  12. Raw materials for the energy supply of the future. Geology, markets, environmental influences

    International Nuclear Information System (INIS)

    Hagelueken, Christian; Thauer, Rudolf K.; Buchholz, Peter; Gutzmer, Jens; Littke, Ralf; Angerer, Gerhard; Wellmer, Friedrich-Wilhelm

    2015-01-01

    More and more metals are needed to expand modern energy technologies, but we can not completely dispense with fossil raw materials and biomass in the near future either. Are the incidence of the conversion of energy sources sufficient? The analysis of the academy project ''Energy Systems of the Future'' (ESYS) comes to the conclusion that geologically enough raw materials are available. The challenge, however, is to make the supply safe, affordable and environmentally and socially compatible. The analysis explains the mechanisms of action on the global commodity markets and identifies supply risks. These include, for example, sudden demand on the international markets as well as the unequal distribution of the world's raw material reserves. This is followed by the analysis approaches, in order to recognize warning signals for potential raw material bottlenecks in time, to develop evasive strategies and to secure the raw material supply for the energy turnarounds. For example, the expansion of recycling can help to reduce the dependence on metal imports. In mining, on the other hand, innovative technologies have to be developed in order to improve the exploration and utilization of the deposits. By establishing binding environmental and social standards, the extraction of raw materials could also become more sustainable. The analysis also highlights the importance of bioenergy and fossil raw materials, such as oil and natural gas, for energy generation. The authors describe the advantages and disadvantages of these energy carriers and the measures that can be used to reduce environmental pollution such as greenhouse gas emissions. [de

  13. Comparative study of fix-installed monitoring instruments and its application in detecting uncontrolled trafficking of radioactive materials at airports

    International Nuclear Information System (INIS)

    Pujol, L.; Suarez-Navarro, M. J.; Gonzalez-Gonzalez, J. A.; Garcia-Galludo, M.

    2010-01-01

    In this paper we analyze the response of three commercial equipment designed to detect illicit trafficking or inadvertent movement of radioactive materials at airports when carried by passengers. We compared three fix-installed instruments: APM (Bicron), GR-606 (Exploranium), and FHT-1372 (Thermo Eberline). In this initial evaluation conducted at the Laboratory of Nuclear engineering of the School of Civil Engineering, it was observed that the FHT-1372 introduced a fester detection response, sensitive and allowed the measurement of total dose rate and artificial dose rate. This equipment was installed at the exit from customs passenger of Barajas international airport operating for a period of 108 days in 2002 with a total number of 1,339,931 people. this period was divided into 5 sessions to establish suitable investigation levels to detect a possible incident of radioactive material, which was finally set at 110 nSv/h to total dose rate and 25 nSv/h for artificial dose rate. During this period 39 possible incidents were detected above the investigation level established, 5 of them with a value 10 times the environmental background of the room where the equipment was installed (about 90 nSv/h), and no level exceeded 100 μSv/h at 1 m distance, which is the limit for legal transport of radioactive materials from the International Atomic Energy Agency (IAEA). (Author) 17 refs.

  14. Towards a dynamic assessment of raw materials criticality: linking agent-based demand--with material flow supply modelling approaches.

    Science.gov (United States)

    Knoeri, Christof; Wäger, Patrick A; Stamp, Anna; Althaus, Hans-Joerg; Weil, Marcel

    2013-09-01

    Emerging technologies such as information and communication-, photovoltaic- or battery technologies are expected to increase significantly the demand for scarce metals in the near future. The recently developed methods to evaluate the criticality of mineral raw materials typically provide a 'snapshot' of the criticality of a certain material at one point in time by using static indicators both for supply risk and for the impacts of supply restrictions. While allowing for insights into the mechanisms behind the criticality of raw materials, these methods cannot account for dynamic changes in products and/or activities over time. In this paper we propose a conceptual framework intended to overcome these limitations by including the dynamic interactions between different possible demand and supply configurations. The framework integrates an agent-based behaviour model, where demand emerges from individual agent decisions and interaction, into a dynamic material flow model, representing the materials' stocks and flows. Within the framework, the environmental implications of substitution decisions are evaluated by applying life-cycle assessment methodology. The approach makes a first step towards a dynamic criticality assessment and will enhance the understanding of industrial substitution decisions and environmental implications related to critical metals. We discuss the potential and limitation of such an approach in contrast to state-of-the-art methods and how it might lead to criticality assessments tailored to the specific circumstances of single industrial sectors or individual companies. Copyright © 2013 Elsevier B.V. All rights reserved.

  15. Study of device for precompaction and uniform supply of materials to working bodies of aggregate

    Science.gov (United States)

    Romanovich, A. A.; Kolesnikov, R. S.; Romanovich, M. A.

    2018-03-01

    The article considers perspective ways of increase of reliability and durability of the press roller grinder due to the uniform supply of crushed materials across the width of the rolls. The mechanism of distribution and pre- compaction of materials in a roller arrangement has been analytically studied, an equation has been derived for calculating the effort expended. The materials of the article are devoted to increasing the reliability of the press roller grinder due to the uniform supply of grindable materials along the width of the rolls and may be of interest to Russian and foreign organizations that carry out their activities in the field of exploitation, designing and manufacturing of crushing and grinding equipment.

  16. Towards a dynamic assessment of raw materials criticality: Linking agent-based demand — With material flow supply modelling approaches

    International Nuclear Information System (INIS)

    Knoeri, Christof; Wäger, Patrick A.; Stamp, Anna; Althaus, Hans-Joerg; Weil, Marcel

    2013-01-01

    Emerging technologies such as information and communication-, photovoltaic- or battery technologies are expected to increase significantly the demand for scarce metals in the near future. The recently developed methods to evaluate the criticality of mineral raw materials typically provide a ‘snapshot’ of the criticality of a certain material at one point in time by using static indicators both for supply risk and for the impacts of supply restrictions. While allowing for insights into the mechanisms behind the criticality of raw materials, these methods cannot account for dynamic changes in products and/or activities over time. In this paper we propose a conceptual framework intended to overcome these limitations by including the dynamic interactions between different possible demand and supply configurations. The framework integrates an agent-based behaviour model, where demand emerges from individual agent decisions and interaction, into a dynamic material flow model, representing the materials' stocks and flows. Within the framework, the environmental implications of substitution decisions are evaluated by applying life-cycle assessment methodology. The approach makes a first step towards a dynamic criticality assessment and will enhance the understanding of industrial substitution decisions and environmental implications related to critical metals. We discuss the potential and limitation of such an approach in contrast to state-of-the-art methods and how it might lead to criticality assessments tailored to the specific circumstances of single industrial sectors or individual companies. - Highlights: ► Current criticality assessment methods provide a ‘snapshot’ at one point in time. ► They do not account for dynamic interactions between demand and supply. ► We propose a conceptual framework to overcomes these limitations. ► The framework integrates an agent-based behaviour model with a dynamic material flow model. ► The approach proposed makes

  17. Determining the Supply of Material Resources for High-Rise Construction: Scenario Approach

    Science.gov (United States)

    Minnullina, Anna; Vasiliev, Vladimir

    2018-03-01

    This article presents a multi-criteria approach to determining the supply of material resources for high-rise construction under certain and uncertain conditions, which enables integrating a number of existing models into a fairly compact generalised economic and mathematical model developed for two extreme scenarios.

  18. Guide to Effective Business Practices in Buying School Supplies, Instructional Materials, Equipment and Services.

    Science.gov (United States)

    Association of School Business Officials International, Reston, VA.

    This guide to effective business practices is intended to assist schools in establishing general policies and procedures for buying supplies, instructional materials, equipment, and services. Federal, state, and local laws must be considered in addition to the recommendations made in this report. Practical guidelines are given for selecting…

  19. A TDR-based system for the localization of leaks in newly installed, underground pipes made of any material

    International Nuclear Information System (INIS)

    Cataldo, A; Cannazza, G; De Benedetto, E; Giaquinto, N

    2012-01-01

    In this paper, a time domain reflectometry-based system for locating leaks in underground pipes (made of any material) is presented. The proposed system simply requires that a biwire should be attached to the pipe (all along its length), at the time of installation. Basically, the biwire acts as a permanent sensing element that can be connected to the measurement instrument whenever it is necessary to check for the presence of leaks. It is worth emphasizing that such a simple and low-cost system could tremendously facilitate leak detection not only in water distribution systems but also in wastewater/sewer pipelines. The proposed system was validated through measurements on a newly installed pilot plant, in which a leak was intentionally provoked. (paper)

  20. Listing the investment costs and producing material analyses for given plants for energy supply

    International Nuclear Information System (INIS)

    Wagner, H.J.; Hansen, K.; Schoen, R.; Wassmann, B.

    1989-01-01

    In this comparison, the investment and material cost for the following plants are examined: 1. Solar service water treatment plants, 2. Solar heating plants, 3. Conventional comparative plants, 4. Heat pump heating plants, 5. Nuclear power stations and hardcoal-fired power stations, and 6. Wind energy converters. The technique of energy conversion of each is generally explained. In the appendix, points of the use of energy are given for the manufacture of components of the heating and installation trade. Specific energy costs per product unit are compiled for the different branches. (UA) [de

  1. Release of radioisotopes and activated materials from nuclear installations and facilities

    International Nuclear Information System (INIS)

    Manfredi, P.F.; Millaud, J. E.

    2001-01-01

    This report discusses the problems of release of items from facilities and installations where radiation-based activities have been carried out. Several situations are reviewed and their release problems are discussed in detail. Particular attention is devoted to the assessment of the activity of the items to be released. A correct assessment of the activity will help the decision about the final use of the items removed from the radiation-related facility, either re-use, entering the public market, recycling, disposal and storage under different procedures. Even the final destination of the building which hosted the facility needs to be decided on the basis of an accurate assessment of the residual activity. The assessment of the activity, besides being fundamental in guaranteeing a safe approach to the procedures related to the release may result in a substantial profit. This is the case of items whose level of activity is so low that they can be put on the public market, reused or recycled for final product subject to very stringent radiation safety requirements. It will be shown that detector techniques play a fundamental role in the release process. In particular, the low-level counting techniques are fundamental in establishing whether or not the unrestrained release is feasible or not

  2. High reliability solid refractive index matching materials for field installable connections in FTTH network

    Science.gov (United States)

    Saito, Kotaro; Kihara, Mitsuru; Shimizu, Tomoya; Yoneda, Keisuke; Kurashima, Toshio

    2015-06-01

    We performed environmental and accelerated aging tests to ensure the long-term reliability of solid type refractive index matching material at a splice point. Stable optical characteristics were confirmed in environmental tests based on an IEC standard. In an accelerated aging test at 140 °C, which is very much higher than the specification test temperature, the index matching material itself and spliced fibers passing through it had steady optical characteristics. Then we performed an accelerated aging test on an index matching material attached to a built-in fiber before splicing it in the worst condition, which is different from the normal use configuration. As a result, we confirmed that the repeated insertion and removal of fiber for splicing resulted in failure. We consider that the repetition of adhesion between index matching material and fibers causes the splice to degrade. With this result, we used the Arrhenius model to estimate a median lifetime of about 68 years in a high temperature environment of 60 °C. Thus solid type index matching material at a splice point is highly reliable over long periods under normal conditions of use.

  3. The evaluation process of the decommissioning of nuclear installations from the perspective of materials remelting

    International Nuclear Information System (INIS)

    Hornacek, M.; Necas, V.; Zachar, M.

    2012-01-01

    The subject of the work is to evaluate the process of decommissioning SW from operation in terms of releasable materials into the environment in the form of ingots after remelting depending on the changes of selected input parameters. The number as well as batch load is analysed in terms of compliance with the limits for release into the environment. Calculations were carried out by means of OMEGA and MicroShield , which are described more detailed in the next sections. (author)

  4. On-off controller for installation to test the pressurized water reactor material

    International Nuclear Information System (INIS)

    Zauq, M.H.

    1982-05-01

    This report describes the design of an ON-OFF controller based on the 6800 microprocessor in its assembly language and its interfacing with its environment (sensors, periphery, etc). The controller is meant to control the temperature and the pressure inside an experimental chamber in which the material under test is placed. The ''Design basis accident'' conditions (e.g., LOCA) for a pressurized water reactor are simulated in the experimental chamber [fr

  5. Material streams in the fuel supply to and disposal of waste from nuclear power stations

    International Nuclear Information System (INIS)

    Merz, E.

    1990-01-01

    The nuclear fuel cycle is characterized by specifically small, but complex material streams. The fresh fuel derived from natural uranium is fed into the cycle at the stage of fuel element fabrication, while at the end stage, waste from spent fuel element reprocessing, or non-reprocessible fuel elements, are taken out of the cycle and prepared for ultimate disposal. The alternative methods of waste management, reprocessing or direct ultimate disposal, are an issue of controversial debate with regard to their differences in terms of supply policy, economic and ecological aspects. (orig.) [de

  6. Design of Photovoltaic System with Electric network shot installed at small factories for the production of construction materials at Maisi

    International Nuclear Information System (INIS)

    Parúas Cuza, Rafael

    2017-01-01

    The project was developed in the Mini-industry of local production of materials of the construction belonging to the community of Tip of Maisi, County Guantanamo, with the objective of allowing the energy self-sufficiency in a sustainable way starting from the installation from a Photovoltaic System of Injection to Net, as catalyst of these productions, contributing to the development of the renewable sources of form energy decentralized for the local development, and the conservation from the environment when diminishing the emissions of polluting gases. Leaving of the solar resource of this area, the photovoltaic system was designed so that the capacity of the system to settle the consumption outline maintained by the mini-industry (45 kWh / day), avoiding the unnecessary deliveries to the electric external net, and in that way to shorten the period of recovery of this technology. (author)

  7. Chances for a long-term securing of the raw material supply to the FRG. Pt. 1

    International Nuclear Information System (INIS)

    1975-09-01

    The Federal Republic of Germany is almost completely dependent on raw material imports. Growing raw material consumption and an imminent increase in supply uncertainties will require intensified research and development work in the field of raw material safeguarding. Initial approaches to possible technical solutions are being indicated in connection with four raw materials (aluminium, copper, phosphate and carbon carriers). The material balances of these raw materials are shown and the technical and economic interrelations illustrated in the light of world-wide trends. It is being demonstrated that two essential objectives are to be pursued for securing raw material supplies: 1) extension of the raw material basis for primary and secondary raw materials, 2) improvement of raw material utilization in all sectors of economy. To provide a solution for the wide spectrum of tasks it will be necessary to establish adequate analytical methods and procedures. (orig.) [de

  8. Pulse explosion ion beam source with one pulse regime supply for surface modification of materials

    International Nuclear Information System (INIS)

    Korenev, S.A.

    1989-01-01

    A variant of explosion ion beam source with one positive pulse supply for surface modification of materials is described. Ion source consists of vacuum diode and pulse generator Arcadiev-Marx type. Residual gas pressure was p∼5x10 -5 torr in the diode. The sort of ions was fixed by materials initiator anode plasma. The produce carbon ions a carbon-fibrous initiator is used for niobium and titanium-niobium-titanium cable with picking copper matrix. The ions density current regulation is realized by by change of diode gap in the correspondence with Child-Langmuir law. For carbon ions the current density is j∼6A/cm 2 for voltage U∼100kV and j∼32A/cm 2 for voltage U∼300 kV. 7 refs.; 1 fig

  9. Exergy Analysis of the Supply of Energy and Material Resources in the Swedish Society

    Directory of Open Access Journals (Sweden)

    Mei Gong

    2016-09-01

    Full Text Available Exergy is applied to the Swedish energy supply system for the period 1970–2013. Exergy flow diagrams for the systems of electricity and district heating as well as for the total supply system of energy and material resources for 2012 are presented. The share of renewable use has increased in both electricity and district heat production. The resource use is discussed in four sectors: residential and service, transportation, industry and agriculture. The resource use is also analyzed with respect to exergy efficiency and renewable share. The total exergy input of energy and material resources amounts to about 2700 PJ of which about 530 PJ was used for final consumption in 2012. The results are also compared with similar studies. Even though the share of renewable resource use has increased from 42% in 1980 to 47% in 2012, poor efficiency is still occurring in transportation, space heating, and food production. A strong dependence on fossil and nuclear fuels also implies a serious lack of sustainability. A more exergy efficient technology and a higher renewable energy share are needed in order to become a more sustainable society.

  10. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  11. Closeout of NRC Bulletin 88-05: Nonconforming materials supplied by Piping Supplies, Inc., at Folsom, New Jersey, and West Jersey Manufacturing Company at Williamstown, New Jersey

    International Nuclear Information System (INIS)

    1990-05-01

    This report documents the activities that led to the closeout of U.S. Nuclear Regulatory Commission (NRC) Bulletin 88-05, which was issued on May 6, 1988. The bulletin required that licensees submit information on materials supplied by Piping Supplies, Inc. (PSI) and West Jersey Manufacturing Company (WJM), and requested that they (1) ensure that these materials complied with the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code) and design specifications or were suitable for their intended service or (2) replace such materials. Supplements 1 and 2 were issued on June 15 and August 3, 1988, respectively. In Supplement 2, another affiliated supplier, Chews Landing Metal Manufacturers, Incorporated (CLM), was identified. The staff concluded that (1) the analytical procedures used to qualify the nonconforming parts and the analysis results provide and adequate basis for resolving the staff's concerns regarding fitting and flanges; (2) even though the materials supplied by PSI, WJM, and CLM with falsified certified material test reports do not meet the ASME Code, their use is an acceptable alternative in accordance with Section 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations; (3) activities in response to Bulletin 88-05 regarding fittings and flanges can be closed for all operating plants; and (4) licensees should evaluate the use of product forms other fittings and flanges

  12. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  13. Materials used in new generation vehicles: supplies, shifts, and supporting infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.; Curlee, T.R. [Oak Ridge National Lab., TN (United States); Schexnayder, S.M. [Univ. of Tennessee, Knoxville, (United States)

    1997-08-01

    The Partnership for a New Generation of Vehicles (PNGV) program intends to develop new designs for automobiles that will reduce fuel consumption by two thirds but otherwise have price, comfort, safety, and other measures of performance similar to the typical automobile now on the market. PNGV vehicle designs are expected to substitute lightweight materials, such as aluminum, magnesium, carbon-reinforced polymer composites, glass-reinforced polymer composites, and ultra- light steel, for heavier materials such as steel and iron in automobile components. The target mass of a PNGV vehicle is 1,960 pounds, as compared to the average current vehicle that weights 3,240 pounds. Other changes could include the use of different ferrous alloys, engineering changes, or incorporation of advanced ceramic components. Widespread adoption of these vehicle designs would affect materials markets and require concurrent development and adoption of supporting technologies to supply the materials and to use and maintain them in automobiles. This report identifies what would be required to bring about these changes and developments in materials substitution; identifies reasons that might make these substitutions difficult to accomplish within the overall objectives and timetable of the PNGV program; and identifies any issues arising from the substitution that could prompt consideration of policies to deal with them. The analysis in this paper uses scenarios that assume the production of new generation vehicles will begin in 2007 and that their market share will increase gradually over the following 25 years. The scenarios on which the analysis is based assume a maximum substitution of each potential replacement material considered. This maximum substitution of individual materials (i.e., the amount of replacement material by weight that would be added to the baseline vehicle`s composition) is as follows: ULSAB (high strength steel), 298 lbs.; glass-reinforced composites, 653 lbs.; carbon

  14. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  15. Project of law authorizing the approval of the agreement between the government of the French republic and the government of the Russian federation relative to the civil liability by way of nuclear damage owing to the supply of materials from the French republic devoted to nuclear facilities in the Russian federation; Projet de loi autorisant l'approbation de l'accord entre le gouvernement de la republique francaise et le gouvernement de la federation de Russie relatif a la responsabilite civile au titre de dommages nucleaires du fait de fournitures en provenance de la republique francaise destinees a des installations nucleaires en federation de Russie

    Energy Technology Data Exchange (ETDEWEB)

    Raffarin, J.P.; Villepin, D. de

    2002-07-01

    An agreement between France and Russia was signed on June 20, 2000 about the civil liability of Russia because of the supply of French material devoted to Russian nuclear facilities. This agreement was necessary because Russia do not belong to any of the two big international civil liability systems relative to nuclear energy, i.e. the Paris convention from July 29, 1960 (in the OECD framework) and the Vienna convention from May 21, 1963 (in the IAEA framework). This agreement offers a protection to the French nuclear suppliers against any damage claims in the case of a nuclear accident occurring on the Russian federation territory. This project of law aims at approving this agreement. (J.S.)

  16. Framework for resilience in material supply chains, with a case study from the 2010 Rare Earth Crisis.

    Science.gov (United States)

    Sprecher, Benjamin; Daigo, Ichiro; Murakami, Shinsuke; Kleijn, Rene; Vos, Matthijs; Kramer, Gert Jan

    2015-06-02

    In 2010, Chinese export restrictions caused the price of the rare earth element neodymium to increase by a factor of 10, only to return to almost normal levels in the following months. This despite the fact that the restrictions were not lifted. The significant price peak shows that this material supply chain was only weakly resistant to a major supply disruption. However, the fact that prices rapidly returned to lower levels implies a certain resilience. With the help of a novel approach, based on resilience theory combined with a material flow analysis (MFA) based representation of the neodymium magnet (NdFeB) supply chain, we show that supply chain resilience is composed of various mechanisms, including (a) resistance, (b) rapidity, and (c) flexibility, that originate from different parts of the supply chain. We make recommendations to improve the capacity of the NdFeB system to deal with future disruptions and discuss potential generalities for the resilience of other material supply chains.

  17. Present and future trends in pellet markets, raw materials, and supply logistics in Sweden and Finland

    International Nuclear Information System (INIS)

    Selkimaeki, Mari; Mola-Yudego, Blas; Roeser, Dominik; Prinz, Robert; Sikanen, Lauri

    2010-01-01

    Wood pellets have become an important fuel in heat and power production, and pellet markets are currently undergoing rapid development. In this paper, the pellet markets, raw materials and supply structures are analyzed for Sweden and Finland, based on a database of the current location and production capacity of the pellet producers, complemented with existing reports and literature. In Sweden, a total of 94 pellet plants/producers were identified, producing 1.4 million tonnes of pellets, while the domestic consumption was 1.7 million tonnes, and about 400,000 t of pellets were imported to fulfil the demand in 2007. In Finland, 24 pellet plants/producers were identified and the production was around 330,000 t while the domestic consumption was 117,000 t in 2007. In Finland, pellet market has been long time export oriented, whereas domestic consumption has been growing mainly in the small scale consumer sector, estimated 15,000 households had pellet heating systems in 2008. In the future, the increasing number of pellet users will require a reliable delivery network and good equipment for bulk pellet deliveries. Provision of new raw materials and ensuring the good quality of pellets through the whole production, delivery and handling chain will be fundamental in order to increase the use of pellets and sustain the ability to compete with other fuels. (author)

  18. Mounting and performance measurements of a PV array addition to an existing small wind-power installation for greenhouse electric supply in Patagonia

    Directory of Open Access Journals (Sweden)

    Rafael Oliva

    2016-08-01

    Full Text Available A small wind-power system intended for electric supply of a research greenhouse at the local University facilities in San Julian region incorporates a photovoltaic (PV array and regulator, which is described in this report together with its data-acquisition system. The main application is control and lighting. The Alternative Energy Group at the University seeks through this project to acquire knowledge and practical experience in the combination of renewable energy sources for optimal electrical supply of isolated systems, their associated measurements and processing of resulting data

  19. Time presses for the installation of a central controller [in the energy supply industry]. Strategic re-orientation of the present system

    International Nuclear Information System (INIS)

    Van den Berg, R.J.; Van Essen, M.; Meulmeester, P.; Olde Rikkert, B.

    2007-01-01

    The installation of a so-called central controller for the electric power industry has a number of advantages for stakeholders in the energy market: improving the exchange of information between energy utilities, save costs by setting up central registers for connections, meters, measured data and central processes for e.g. reconciliation and management of measured data (in particular with regard to smart metering). As an example attention is paid to the NEMMCO-case (National Electricity Code Administrator) in Australia [nl

  20. The future supply of and demand for candidate materials for the fabrication of nuclear fuel waste disposal containers

    International Nuclear Information System (INIS)

    Grover, L.K.

    1990-01-01

    This report summarizes the findings of a literature survey carried out to assess the future world supply of and demand for titanium, copper and lead. These metals are candidate materials for the fabrication of containers for the immobilization and disposal of Canada's nuclear used-fuel waste for a reference Used-fuel Disposal Centre. Such a facility may begin operation by approximately 2020, and continue for about 40 years. The survey shows that the world has abundant supplies of titanium minerals (mostly in the form of ilmenite), which are expected to last up to at least 2110. However, for copper and lead the balance between supply and demand may warrant increased monitoring beyond the year 2000. A number of factors that can influence future supply and demand are discussed in the report

  1. The Texts of the Instruments connected with the Agency's Assistance to Turkey in furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-07-20

    The texts of the Master Agreement between the Agency and the Government of Turkey and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials are reproduced in this document for the information of all Members. Both Agreements entered into force on 8 February 1966.

  2. The Texts of the Instruments connected with the Agency's Assistance to Turkey in furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1966-01-01

    The texts of the Master Agreement between the Agency and the Government of Turkey and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials are reproduced in this document for the information of all Members. Both Agreements entered into force on 8 February 1966

  3. The Text of the Agreement connected with the Agency's Assistance to Bulgaria in furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1971-01-01

    The text of the Master Agreement between the Agency and the Government of Bulgaria for assistance by the Agency in furthering projects by the supply of materials is reproduced herein for the information of all Members. This Agreement entered into force on 15 July 1970.

  4. The Texts of the Instruments connected with the Agency's Assistance to Greece in furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1971-01-01

    The texts of the Master Agreement between the Agency and the Government of Greece, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials are reproduced herein for the information of all Members. These Agreements entered into force on 2 June 1970 and 20 July 1970 respectively.

  5. The Texts of the Instruments connected with the Agency's Assistance to India in furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1967-01-01

    The texts of the Master Agreement between the Agency and the Government of India, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced in this document for the information of all Members. Both Agreements entered into force on 9 December 1966

  6. The Text of the Agreement connected with the Agency's assistance to Pakistan in furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1971-01-01

    The text of the Master Agreement between the Agency and the Government of Pakistan for assistance by the Agency in furthering projects by the supply of materials is reproduced herein for the information of all Members. This Agreement entered into force on 27 February 1970.

  7. The Texts of the Instruments connected with the Agency's Assistance to Iraq in Furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1973-01-01

    The texts of the Master Agreement between the Agency and the Government of Iraq, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members

  8. The Texts of the Instruments connected with the Agency's Assistance to Brazil in Furthering Projects by the Supply of Material

    International Nuclear Information System (INIS)

    1971-01-01

    The texts of the Master Agreement between the Agency and the Government of Brazil, and of Supplementary Agreement No.1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. These Agreements entered into force on 20 November 1970 and 12 January 1971 respectively.

  9. The Text of the Agreement connected with the Agency's Assistance to Bulgaria in furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1971-05-20

    The text of the Master Agreement between the Agency and the Government of Bulgaria for assistance by the Agency in furthering projects by the supply of materials is reproduced herein for the information of all Members. This Agreement entered into force on 15 July 1970.

  10. The Texts of the Instruments connected with the Agency's Assistance to Mexico in Furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1973-11-28

    The texts of the Master Agreement between the Agency and the Government of Mexico, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members.

  11. The Texts of the Instruments connected with the Agency's Assistance to Greece in furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1971-05-27

    The texts of the Master Agreement between the Agency and the Government of Greece, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials are reproduced herein for the information of all Members. These Agreements entered into force on 2 June 1970 and 20 July 1970 respectively.

  12. The Texts of the Instruments connected with the Agency's Assistance to India in furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-06-09

    The texts of the Master Agreement between the Agency and the Government of India, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced in this document for the information of all Members. Both Agreements entered into force on 9 December 1966.

  13. The Texts of the Instruments connected with the Agency's Assistance to Brazil in Furthering Projects by the Supply of Material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1971-05-20

    The texts of the Master Agreement between the Agency and the Government of Brazil, and of Supplementary Agreement No.1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. These Agreements entered into force on 20 November 1970 and 12 January 1971 respectively.

  14. The Texts of the Instruments connected with the Agency's Assistance to Iraq in Furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1973-11-28

    The texts of the Master Agreement between the Agency and the Government of Iraq, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members.

  15. The Text of the Agreement connected with the Agency's assistance to Pakistan in furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1971-05-20

    The text of the Master Agreement between the Agency and the Government of Pakistan for assistance by the Agency in furthering projects by the supply of materials is reproduced herein for the information of all Members. This Agreement entered into force on 27 February 1970.

  16. Communications Received from the United States of America Regarding the Supply of Nuclear Material Through the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-08-29

    On 17 April 1975 the Director General received a letter dated 15 April from the Resident Representative of the United States of America to the Agency providing information in connection with contracts and other agreements signed by or on behalf of the United States Atomic Energy Commission for the supply of nuclear material through the Agency.

  17. Optimization of the raw material supply chain for Philips TL factories

    NARCIS (Netherlands)

    Rodrigues, Iana Araujo

    2009-01-01

    The globalization results in more complex and dynamic supply chains. While Asia becomes the first sourcing alternative for many companies, supply chains need to be redesigned in order to reduce costs, improve performance, increase flexibility and expand collaboration among the parties involved. It

  18. Thermodynamic, ecological and economic aspects of the use of the gas turbine for heat supply to the stripping process in a supercritical CHP plant integrated with a carbon capture installation

    International Nuclear Information System (INIS)

    Bartela, Łukasz; Skorek-Osikowska, Anna; Kotowicz, Janusz

    2014-01-01

    Highlights: • Variants of integration of CHP plant with CCS and gas turbine unit were analyzed. • The simulations of operation of plants under changing load were realized. • Conditions of competitiveness for all solutions were identified. • Integration can be profitable if prices of allowance will reach values >60 €/MgCO 2 . - Abstract: This paper presents the results of thermodynamic and economic analyses for eight variants of a combined heat and power (CHP) plant fuelled with coal working under supercritical steam parameters and integrated with a CO 2 capture installation and a gas turbine system. The motivation behind using a gas turbine in the system was to generate steam to supply heat for the stripping process that occurs in the separation installation to regenerate the sorbent. Additional analyses were conducted for the reference case, a CHP unit in which the CO 2 separation process was not conducted, to enable an economic evaluation of the integration of a CHP unit with a CO 2 separation installation according to the variants proposed. The break-even price of electricity and avoided emission costs were used to evaluate the respective solutions. In this paper, the results of the sensitivity analysis of the economic evaluation indicators in terms of the change in the annual operation time, price of emission allowance and heat demand rate for the realization of the stripping process for all cases are presented

  19. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  20. Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance

    Directory of Open Access Journals (Sweden)

    Dr. Ghaith Al-Werikat

    2017-03-01

    Full Text Available With the new developments and challenges within the construction industry improving the construction supply chain is becoming a major concern to both governments and industries. Improving the construction supply chain helps in improving the quality of construction projects reducing cost wastes delays and other disruptions. This paper discusses the analysis of material flow in the construction supply chain. The methodology consisted of preliminary investigations survey and simulation development to analyse the extent of impact that material flow has on construction projects in Jordan. Both the main survey and the investigations revealed that material flow delays are caused mainly by 3 types of delays late delivery wrong specification and material damaged on site. The highest impact regarding late deliveries was scaffolding with a 16 probability of occurrence a 2-day delay on the activitys duration. Concrete ranked highest regarding wrong specification with a 19 probability of occurrence an 8-day delay the activitys duration. Regarding materials damaged on site bricks ranked highest with a 9 probability of occurrence a 3-day delay on the duration. The simulation results exhibited a delay of 50 on the projects duration and a probability of a delay occurring is 9.2.

  1. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  2. Supply guarantee initiatives for nuclear fuel materials and services and their compatibility with the market

    International Nuclear Information System (INIS)

    Nagano, Koji

    2009-01-01

    This paper first discusses where and why those ideas for nuclear fuel supply assurance and guarantee mechanisms came out, and attempts to draw a comparison among the proposed schemes and thereby examine possible steps forward. (author)

  3. An evaluation of the procedures required to ensure consistent material supply in the Eastern Cape automotive industry

    Directory of Open Access Journals (Sweden)

    GS Horn

    2014-07-01

    Full Text Available There is a common perception that logistics practice and supply chain management have not yet reached the required international standards among all the supply chain members in the South African automotive industry. This article is based on a research study that investigated possible reasons for the inconsistent supply of materials in the Eastern Cape automotive industry specifically. Problems identified include the fact that suppliers are not evaluated on a regular basis and do not receive sufficient logistics training, while a commitment and will to development local suppliers is lacking. Recommendations made to the South African automotive industry include the improvement of development programmes to assist local suppliers in becoming world-class suppliers, better logistics training, more regular supplier assessments, as well as improved mutual communication among suppliers and motor vehicle assemblers.

  4. Construction and operation of mining and power supply installations in the German Democratic Republic after the enactment of the State Treaty on May 18, 1990

    International Nuclear Information System (INIS)

    Palm, M.

    1990-01-01

    The paper deals with differences in substantial laws in the states to the treaty in individual fields of law, and their respective constitutional roots. The initial situation - status quo ante (mining and energy law in Germany until 1945 and in the GDR until 1989), changes in mining and energy law in the GDR under the State Treaty of 18.5.1990 (basics of the new law in the GDR since 1.7.1990, further law-making acts concerning the mining and power supply industry). The author gives an outlook on the future mining and energy law in the GDR after the accession pursuant to article 23 of the basic law, i.e. the adoption of federal regulations of administrative, procedural, mining and energy law, and on uncertainties remaining during the transitional phase. (RST) [de

  5. Evaluation of the contact switch materials in high voltage power supply for generate of underwater shockwave by electrical discharge

    Directory of Open Access Journals (Sweden)

    K Higa

    2016-10-01

    Full Text Available We have developed the high voltage power-supply unit by Cockcroft-Walton circuit for ingenerate high pressure due to underwater shockwave by electrical discharge. This high voltage power supply has the problem of the metal contact switch operation that contact switch stop by melting and bonding due to electrical spark. We have studied the evaluation of materials of contact switch for the reducing electrical energy loss and the problem of contact switch operation. In this research, measurement of discharge voltage and high pressure due to underwater shockwave was carried out using the contact switch made of different materials as brass plate, brass-carbon plate-brass and carbon block. The contact switch made of carbon is effective to reduce energy loss and problem of contactor switch operation.

  6. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  7. The Texts of the Instruments connected with the Agency's Assistance to Yugoslavia in Furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1971-05-27

    The texts of the Master Agreement between the Agency and the Government of Yugoslavia, and of Supplementary Agreements No. 1 and No. 2 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. These Agreements entered into force on 29 May 1970, 8 September 1970 and 2 February 1971 respectively.

  8. The Texts of the Instruments Connected with the Agency's Assistance to Chile in Furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1973-01-01

    The texts of the Master Agreement between the Agency and the Government of Chile, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. The Master Agreement entered into force on 16 March 1973, pursuant to its Article XIV, and the Supplementary Agreement on 14 June 1973, pursuant to its Article IV.

  9. The Texts of the Instruments connected with the Agency's Assistance to Romania in Furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-06-09

    The texts of the Master Agreement between the Agency and the Government of Romania, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced in this document for the information of all Members. The former Agreement entered into force on 22 April 1966, and the latter on 1 August 1966.

  10. The Texts of the Instruments Connected with the Agency's Assistance to Chile in Furthering Projects by the Supply of Materials

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1973-11-29

    The texts of the Master Agreement between the Agency and the Government of Chile, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. The Master Agreement entered into force on 16 March 1973, pursuant to its Article XIV, and the Supplementary Agreement on 14 June 1973, pursuant to its Article IV.

  11. The Texts of the Instruments connected with the Agency's Assistance to Yugoslavia in Furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1971-01-01

    The texts of the Master Agreement between the Agency and the Government of Yugoslavia, and of Supplementary Agreements No. 1 and No. 2 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced herein for the information of all Members. These Agreements entered into force on 29 May 1970, 8 September 1970 and 2 February 1971 respectively.

  12. The Texts of the Instruments connected with the Agency's Assistance to Romania in Furthering Projects by the Supply of Materials

    International Nuclear Information System (INIS)

    1967-01-01

    The texts of the Master Agreement between the Agency and the Government of Romania, and of Supplementary Agreement No. 1 thereto, in connection with the Agency's assistance to that Government in furthering projects by the supply of materials, are reproduced in this document for the information of all Members. The former Agreement entered into force on 22 April 1966, and the latter on 1 August 1966

  13. Safety concerning the alteration in fuel material usage (new installation of the uranium enrichment pilot plant) at Ningyo Pass Mine of Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    A report of the Committee on Examination of Nuclear Fuel Safety was presented to the Atomic Energy Commission of Japan, which is concerned with the safety in the alteration of fuel material usage (new installation of the uranium enrichment pilot plant) at the Ningyo Pass Mine. Its safety was confirmed. The alteration, i.e. installation of the uranium enrichment pilot plant, is as follows. Intended for the overall test of centrifugal uranium enrichment technology, the pilot plant includes a two-storied main building of about 9,000 m 2 floor space, containing centrifuges, UF 6 equipment, etc., a uranium storage of about 1,000 m 2 floor space, and a waste water treatment facility, two-storied with about 300 m 2 floor space. The contents of the examination are safety of the facilities, criticality control, radiation control, waste treatment, and effects of accidents on the surrounding environment. (Mori, K

  14. Assessment of modalities of implementation of a pathway for the valorisation of metallic materials issued from the dismantling of nuclear installations. PNGMDR report

    International Nuclear Information System (INIS)

    2014-01-01

    Within the frame of the French national plan for the management of radioactive wastes (PNGMDR), this report addresses the issue of development of a pathway for the valorisation of metallic materials. After a recall of the history researches and activities on the recycling of materials from the nuclear industry, this report proposes an overview of the present situation in terms of legal context (legal texts, associated concepts, hierarchy of management modes, history and challenges about the definition of a radioactive substance), discusses inventories and flows of these materials and their foreseen evolution, indicates the characteristics and types of the various fields and radionuclides, discusses their physical characteristics (homogeneous or heterogeneous). It presents the main origins of ferrous metals (the Georges Besse I plant, steam generators of PWR, other stocks belonging to the different nuclear operators), discusses the storage capacities (increasing needs and a filling which appears to be quicker than foreseen), comments the physical and radiological characteristics of the delivered wastes. The next part addresses the use of recycled materials for the manufacturing of metallurgy end products (types of containers and other products). The fourth part presents existing industrial installation in Europe or currently projected installations in France: processing of low-level ferrous scraps by melting, processing in European foundries, industrial processes and sectors in Great Britain, project of processing of steam generators and diffusers. A plan of actions is briefly presented, as well as an approach in relationship with health and environmental stakes. Conditions of success are finally identified

  15. Emergency material allocation with time-varying supply-demand based on dynamic optimization method for river chemical spills.

    Science.gov (United States)

    Liu, Jie; Guo, Liang; Jiang, Jiping; Jiang, Dexun; Wang, Peng

    2018-04-13

    Aiming to minimize the damage caused by river chemical spills, efficient emergency material allocation is critical for an actual emergency rescue decision-making in a quick response. In this study, an emergency material allocation framework based on time-varying supply-demand constraint is developed to allocate emergency material, minimize the emergency response time, and satisfy the dynamic emergency material requirements in post-accident phases dealing with river chemical spills. In this study, the theoretically critical emergency response time is firstly obtained for the emergency material allocation system to select a series of appropriate emergency material warehouses as potential supportive centers. Then, an enumeration method is applied to identify the practically critical emergency response time, the optimum emergency material allocation and replenishment scheme. Finally, the developed framework is applied to a computational experiment based on south-to-north water transfer project in China. The results illustrate that the proposed methodology is a simple and flexible tool for appropriately allocating emergency material to satisfy time-dynamic demands during emergency decision-making. Therefore, the decision-makers can identify an appropriate emergency material allocation scheme in a balance between time-effective and cost-effective objectives under the different emergency pollution conditions.

  16. Trim coil power supplies

    International Nuclear Information System (INIS)

    Haisler, R.; Peeler, H.; Zajicek, W.

    1985-01-01

    The 18 trim coil power supplies have been constructed and are now in place in the K500 pit and pit mezzanine. Final wiring of the primary power and control power is proceeding along with installation of cooling water supplies. The supplies are expected to be ready for final testing into resistive loads at the beginning of June, 1985

  17. Guide to the declaration procedure and coding system for criteria concerning significant events related to safety, radiation protection or the environment, applicable to basic nuclear installations and the transport of radioactive materials

    International Nuclear Information System (INIS)

    Lacoste, Andre-Claude

    2005-01-01

    This guide notably contains various forms associated with the declaration of significant events, and explanations to fill them in: significant event declaration form for a basic nuclear installation, significant event declaration form for radioactive material transport, significant event report for a basic nuclear installation, significant event report for radioactive material transport, declaration criteria for significant events related to the safety of non-PWR basic nuclear installations, declaration criteria for significant events related to PWR safety, significant events declared further to events resulting in group 1 unavailability and non-compliance with technical operating specifications, declaration criteria for significant events concerning radiation protection for basic nuclear installations, declaration criteria for significant events concerning environmental protection, applicable to basic nuclear installations, and declaration criteria for significant events concerning radioactive material transport

  18. Hybrid supply chain model for material requirement planning under financial constraints: A case study

    Science.gov (United States)

    Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero

    2014-10-01

    Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.

  19. Food loss rate in food supply chain using material flow analysis.

    Science.gov (United States)

    Ju, Munsol; Osako, Masahiro; Harashina, Sachihiko

    2017-03-01

    The food loss rate is a factor that represents food consumption efficiency. To improve food consumption efficiency, we need to fundamentally quantify food loss at national and global levels. This study examines food and food waste flow and calculates the food loss rate in the food supply chain by targeting Japan. We analyzed inedible food waste and avoidable food losses in wholesale, manufacturing, retail, food services, and households and considered different supply chain pathways, different food categories representing whole Japanese meals, and weight changes after cooking. The results are as follows: (1) Japan has an overall rate of avoidable food losses of approximately 15% for meals (excluding agricultural losses), (2) the supply sector with the highest food loss rate is food services, and (3) the food category with the highest food loss rate is vegetables. Finally, we proposed a model for calculating food loss rates that could be used for future analysis in Japan or other countries. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Law nr 2015-588 of June 2, 2015 related to the strengthening of the protection of civil nuclear installations housing nuclear materials

    International Nuclear Information System (INIS)

    Hollande, Francois; Valls, Manuel; Taubira, Christiane; Le Drian, Jean-Yves; Cazeneuve, Bernard

    2015-01-01

    This publication contains the official text of a law adopted by the French Parliament for the strengthening of civil nuclear installations housing nuclear materials. The first article of this law is made of modifications introduced in the Defence Code. The second article states that a report is to be submitted by the Government to the Parliament on the risk and threat assessment of illegal UAVs flyovers, and on technical solutions to improve the detection and neutralisation of these aircraft, as well as on necessary legal adaptations to punish such infringements

  1. Implications of high renewable electricity penetration in the U.S. for water use, greenhouse gas emissions, land-use, and materials supply

    International Nuclear Information System (INIS)

    Arent, Doug; Pless, Jacquelyn; Mai, Trieu; Wiser, Ryan; Hand, Maureen; Baldwin, Sam; Heath, Garvin; Macknick, Jordan; Bazilian, Morgan; Schlosser, Adam; Denholm, Paul

    2014-01-01

    Highlights: • Renewable electricity generation could supply 80% of U.S. generation in 2050. • GHGs are reduced proportionally and water use is reduced by 50%. • Gross land-use impacts total less than 3% of land area of the contiguous U.S. • Some clean energy technologies rely on materials that face short-term risks. • No insurmountable long-term constraints to materials supply were identified. - Abstract: Recent work found that renewable energy could supply 80% of electricity demand in the contiguous United States in 2050 at the hourly level. This paper explores some of the implications of achieving such high levels of renewable electricity for supply chains and the environment in scenarios with renewable supply up to such levels. Expanding the renewable electricity supply at this scale by 2050 implies annual capacity additions of roughly 20 gigawatts per year (GW/year) over the next decade, rising to roughly 40 GW/year from 2040 to 2050. Given total 2012 renewable electricity capacity additions of slightly more than 16 GW, this suggests moderate growth of the related supply chains, averaging overall roughly 4% annual growth to 2040. Transitioning to high renewable electricity supply would lead to significant reductions in greenhouse gas emissions and water use, with only modest land-use implications. While renewable energy expansion implies moderate growth of the renewable electricity supply chains, no insurmountable long-term constraints to renewable electricity technology manufacturing capacity or materials supply are identified

  2. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  3. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  4. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  5. Further research on melting activated and contaminated materials from the decommissioning of nuclear installations for the final storage

    International Nuclear Information System (INIS)

    Deipenau, H.; Seidler, M.

    1990-07-01

    The unconditional reuse of activated and contaminated materials by melting and the production of qualified casks (type A- and type B-containers) was proved. Investigations on nuclide distribution in the melting furnace, molten material, dust and slag were used as a basis for the erection of a new central melting facility. Melting contaminated carbon steel a mass of 2-5% of the contaminated material was generated as dust and slag. They must be handled and transported as radioactive waste. Melting non-ferrous material activity contents could be reached for unconditional reuse. Binding radioactive carbon in the metal matrix of cast iron is only possible by using crushed graphite. The investigations of this project showed that unconditional reuse of contaminated material is possible in industrial scale. Doses of the workers and of the people in the environment of the facility resulting from melting were far below the limits of the German radiation protection law. Up to 1990 a mass of 2000 Mg of contaminated material was melted in the Siempelkamp foundry. Mass inventories for the dismantling of a reference power plant SWR 900 MWe are calculated. (orig./HP) With 7 refs., 18 tabs., 12 figs [de

  6. Supply of equipment and components, materials of dedicated commercial grade, other services; Suministro de equipos y respuestos. Materiales de grado comercial dedicados. Otros servicios

    Energy Technology Data Exchange (ETDEWEB)

    Perdices, D.; Perez Medina, E.

    2014-10-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  7. Investigating erosion of building materials used in an installation for pneumatic transport of coke breeze and coal

    Energy Technology Data Exchange (ETDEWEB)

    Bandrowski, J.; Kot-Borkowska, Z.; Misztal, M.; Raczek, J.; Kaczmarzyk, G.

    1980-09-01

    This article investigates the influence of the following factors on erosion of building material used in pneumatic transport of coal and coke breeze: intensity of coal or coke breeze flow within the range of 47 to 120 kg/h for coke and 99 to 165 kg/h for coal; speed of solid material particles within the range 3.71 to 7.97 m/s for coke, and 3.30 to 7.58 m/s for coal; duration of the experiments 0.5 to 1.5 h for coke and 2.0 to 5.0 for coal; angle of inclination of the sample of building material 30 to 60 degrees for both coal and coke breeze. Three types of construction material used in pneumatic transport were tested: steel, concrete and chamotte bricks. Investigations show that concrete is characterized by the highest erosion, chamotte bricks by medium erosion and steel by the lowest erosion. As a result of mathematical processing of experimental data, empirical models of erosion of the three materials are constructed. (7 refs.)

  8. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  9. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  10. Supply guarantee initiatives for nuclear fuel materials and services and their compatibility with the market. Present discussions and future prospects

    International Nuclear Information System (INIS)

    Nagano, Koji

    2008-01-01

    Under the weakening NPT (Non-Proliferation Treaty) regime, a number of proposals and initiatives for nuclear fuel supply assurance and guarantee mechanisms have been brought on the agenda of international discussions and negotiations. This report first discusses where and why those ideas came out, and then turn to the current situations of markets of nuclear fuel materials and services in terms of degree of market concentration to specific suppliers. Based on those observations, the author attempts to draw a comparison among the proposed schemes in order to examine possible steps for forward that pose least possible influences adverse to the individual markets and thereby could better attract possible recipient states' interests. The report suggests that those initiatives are classified in three types; a) physical assurance, i.e. specific nation(s) and/or entit(-y/-ies) prepare dedicated reserve of materials and/or service capacities for the purpose of supply assurance; b) collective assurance, i.e. a group of nations and/or entities collectively submit their excess materials and service capacities when assurance is activated; and c) financial measures. In view of their feasibility, a two-step approach might be found practical to implement and promote; i.e. 1) in a short-run, a 'soft' scheme which never interferes NPT signatories' right of peaceful development and use of nuclear power could be set and implemented, and 2) in a long-run, R and D efforts should be undertaken to create such a sufficient economic margin that potential recipient states may lose justification of self-development of nuclear fuel cycle technologies and businesses when compared with those services provided by foreign sources attached with a sufficient degree of supply assurances. (author)

  11. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  12. Farm Water Supply and Sanitation--Pipe, Plumbing, Skills and Symbols. Student Materials. V.A. III. V-D-1, V-D-2.

    Science.gov (United States)

    Texas A and M Univ., College Station. Vocational Instructional Services.

    Designed for use by individuals enrolled in vocational agricultural classes, these student materials deal with farm water supply, sanitation, and plumbing skills. Topics covered in the unit are maintaining the farm water supply; repairing faucets and valves, leaks in pipes and storage tanks, and water closets; clearing clogged drains and traps;…

  13. Introductory lecture: materials aspects of the supply and use of energy

    International Nuclear Information System (INIS)

    Pooley, D.

    1982-01-01

    Materials technology has a vital role to play in changes and improvements which are needed in the energy scene. For example, high-temperature corrosion-resistant materials will enable more efficient aircraft engines to be made. Understanding and combatting corrosion will continue to be important in the treatment and disposal of radioactive waste associated with the use of nuclear power. Many renewable energy sources, often particularly attractive in poor countries, will be economic only if the devices collecting or converting the sunlight, wind power, or other forms of raw energy are able to use materials very effectively and economically and in ways which ensure that the costs of operating and maintaining the devices are not too high. (author)

  14. Did Raw Material Shortages Decide World War Two? New Data for the Example of Nazi Rubber Supplies

    Directory of Open Access Journals (Sweden)

    Paul Ferdinand Schmelzing

    2017-06-01

    Full Text Available Despite a well-established literature on the economics of World War Two, to this day reliable statistics on overall raw material supplies for Nazi Germany are lacking. The operations of shell companies, the special de jure status of occupied areas, and the Wehrmacht practice to “live off the land” have led to a significant underestimation of de facto resource endowments of the Third Reich. For the example of rubber—one of the prime “scarce war commodities”—this article demonstrates the extent and sources of deficiencies, and offers new data. On this basis, and in contrast to recent arguments that view raw materials as a “basic constraint” of the German economy, it is shown that surprisingly comfortable supplies existed between December 1941 and May 1944, during which Nazi-controlled Europe seemed ready to allow a realization of Hitler’s ‘Lebensraum’ designs. The failure to realize those designs originated in military setbacks—which subsequently impacted economic performance as a secondary effect.

  15. Investigation of effect of stopping supply flow into the cell on the confinement of the radioactive materials under fire accident

    International Nuclear Information System (INIS)

    Abe, Hitoshi; Watanabe, Koji

    1999-03-01

    On November 20th 1997, a fire accident happened at Uranium Enrichment Research Laboratory, Tokai, Japan Atomic Energy Research Institute and ventilation filters in the laboratory clogged. When fire accident occurs in a controlled area, a large quantity of smoke generates in the area and dropping exhaust flow from the area by the clogging of ventilation filters and rising pressure in the area are caused. Moreover, leakage of smoke including radioactive materials from the area by the pressure rising is expected. To prevent the leakage, it is expected that stopping supply flow to the area during a fire accident is effective, however, quantitative evaluation about this effect has not been performed. By using CELVA-1D code, one-dimensional thermofluid analysis code, this effect is evaluated quantitatively by modeling the laboratory and estimating source terms released during the fire accident. As the results, it has been found that the efficiency of confinement of the radioactive materials into the area is preserved in the slightly long period of time in case of stopping supply flow to the area, however, this effect can be neglected in case that scale of fire accident is relatively large. (author)

  16. 18 CFR 367.1540 - Account 154, Materials and operating supplies.

    Science.gov (United States)

    2010-04-01

    ... if not known. The cost of repairing the items must be charged to the maintenance account appropriate... the items. The cost of repairing the items must be charged to the appropriate expense account as indicated by previous use. (3) Scrap and non-usable materials included in this account must be carried at...

  17. [Hygienic characteristic of some new materials used for new and modernized water supply systems].

    Science.gov (United States)

    Prokopov, V A; Mironets, N V; Gakal, R K; Martyshchenko, N V; Nadvornaia, Zh N; Poviĭchuk, E R

    1993-09-01

    Activated carbon FAS/Pt and membrane GOMPOD do not deteriorate water quality under its purification. Mineralisator MP-UK in general does not deteriorate water quality. All the studied materials were recommended for treatment and conditioning of water in space apparatuses.

  18. Project, installation and operational tests of a pneumatic system for the IEA-R1 reactor materials

    International Nuclear Information System (INIS)

    Fernando, Alberto de Jesus; Madi Filho, Tufic

    2009-01-01

    Pneumatic Transfer Systems (PTS) are equipment broadly and world widely used for the transport, movement and transfer of diverse types of materials, objects and cargo between two or more environments, near or distant from each other [1]. Due to their flexibility and quickness, the system application is present in several areas, such as medicine (hospitals and clinic analyses laboratories); industry (automobile, metallurgy, iron-making. chemical, food production) commerce (gasoline stations, cinemas, supermarkets, banks, tolls, on-line commerce, casinos); public service (public institutions, courts). In the nuclear field, the PTS has, also, a vast application, highlighting its use in the radioisotope and radiopharmaceuticals of short half life production, such as 67 Ga, 201 Tl, 18F and 123 I-ultra pure. The development of this work is directed to the application of the Pneumatic Transfer System in transport and transfer of materials that will be irradiated in the IEA-R1 reactor, located in the Institute of Energetic and Nuclear Research, IPEN/CNEN-SP, for application of the Neutron Activation Analysis (NAA). (author)

  19. State planning policy 2/07: protection of extractive resources results in certainty of materials supply

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-15

    Extractive resources are primary source materials used for building infrastructure such as roads, ports, airports, bridges, railways, factories, hospitals, schools and homes. The Policy seeks to protect those essential and finite construction materials for future and existing extraction purposes. Population increases in south-east Queensland the upgrading of rail and port facilities to export coal and other minerals will form a major part in the expansion of extractive industry. Over $4 billion has been committed by the Government and industry to coal infrastructure developments such as upgrades at RG Tanna, Barney Point and the proposed Wiggins Island coal terminals at Gladstone, the Dalryample Bay and Hay Point terminals near Mackay and the Abbot Point coal terminal near Bower. The new Bauhinia regional railway will service the Rolleston coal mines.

  20. Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

    CERN Document Server

    2014-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

  1. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  2. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  3. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  4. Analysis of forecasting and inventory control of raw material supplies in PT INDAC INT’L

    Science.gov (United States)

    Lesmana, E.; Subartini, B.; Riaman; Jabar, D. A.

    2018-03-01

    This study discusses the data forecasting sales of carbon electrodes at PT. INDAC INT L uses winters and double moving average methods, while for predicting the amount of inventory and cost required in ordering raw material of carbon electrode next period using Economic Order Quantity (EOQ) model. The result of error analysis shows that winters method for next period gives result of MAE, MSE, and MAPE, the winters method is a better forecasting method for forecasting sales of carbon electrode products. So that PT. INDAC INT L is advised to provide products that will be sold following the sales amount by the winters method.

  5. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  6. Iron losses evaluation in soft magnetic materials with a sinusoidal voltage supply

    DEFF Research Database (Denmark)

    Nedelcu, Steluţa; Ritchie, Ewen; Leban, Krisztina Monika

    2013-01-01

    This paper presents an evaluation method of for specific iron losses in non-oriented laminated steel suitable for electric motors and transformers in the case of a sinusoidal excitation. The model is based on the separation of loss contribution due to hysteresis, eddy currents and excess losses...... (between 0.35 mm and 0.65 mm) and alloy compositions. Hysteresis and eddy currents loss coefficients have been considered as dependent on the frequency. For curve fitting of these coefficients third and fourth polynomials were employed, with good result for all the frequencies and magnetic flux density...... and it is proposing an identification procedure for the model coefficients from multi-frequency single sheet tests. The frequencies used are in the range 10 Hz and 150 Hz and with the values of magnetic flux density in the range 0.1 T and 1.4 T. The model was applied on six magnetic materials of different thicknesses...

  7. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  8. Decree of the 23-rd of June 2015 related to installations implementing radioactive materials, radioactive wastes or solid residues of uranium, thorium or radium ore submitted to authorization according to entry 1716, to entry 1735 and to entry 2797 of the nomenclature of classified installations

    International Nuclear Information System (INIS)

    Blanc, P.

    2015-01-01

    This decree defines general prescriptions applicable to installations implementing radioactive materials, to installations used as depository, warehousing or storage of radioactive materials under the form of solid residues of radium, thorium or uranium ore, as well as some processing products, and to installations used for the management of radioactive wastes in an industrial or commercial facility. The decree contains general arrangements about authorisation request, financial guarantees and conditions of exploitation. It addresses measures and arrangements for the management of installations, for the management of radioactive materials and wastes, for the prevention of atmospheric pollution, for the protection of water resources and aquatic media. It also contains general rules for waste management, specific rules for radioactive waste management. It addresses measures and arrangements regarding the prevention of technological risks, the monitoring of installations and of their impact. An appendix addresses the various aspects of the quality management system: organisation and personnel, risk identification and assessment, process management and exploitation monitoring, management of modifications, planning of emergency situation, return on experience, performance monitoring. A last appendix addresses the monitoring of underground waters

  9. Reassessing Roman ceramic building materials: economics, logistics and social factors in the supply of tile to Dorchester on Thames, Oxfordshire

    Directory of Open Access Journals (Sweden)

    Edward C. Peveler

    2017-01-01

    Full Text Available This research explores the supply of Roman ceramic building materials to Dorchester on Thames, Oxfordshire. Mineralogy and bulk chemistry of tile fabrics were analysed by thin-section and scanning electron microscopy. The assemblage from this Roman ‘small town’ has shown, besides the existence of local manufacture, that tegulae were on occasion transported c. 50 km by road to the site. The ‘pink grog-tempered ware’ fabric in which some tegulae were made is analogous to a fabric used to produce large storage jars in the vicinity of Stowe Park, Buckinghamshire. Analysis and discussion of the mechanisms and logistics which facilitated the production and long-distance transport of these tiles and jars is undertaken. Social and economic factors involved in their production and purchase are proposed. This study demonstrates the importance of greater levels of analysis of building materials, with the potential to inform us about social strata beneath those most visible in the historical and archaeological record, and a significant, often neglected aspect of the Roman economy.

  10. Sustainable prevention of resource conflicts. Raw materials supply and demand (Report 2); Rohstoffkonflikte nachhaltig vermeiden. Rohstoffe zwischen Angebot und Nachfrage (Teilbericht 2)

    Energy Technology Data Exchange (ETDEWEB)

    Taenzler, Dennis; Westerkamp, Meike [Adelphi Research, Berlin (Germany); Supersberger, Nikolaus; Ritthoff, Michael; Bleischwitz, Raimund [Wuppertal Institut (Germany)

    2011-04-15

    The demand for both energetic and non-energetic raw materials has been increasing continuously during the past few decades. Especially during the last few years, the threat of structural shortages of supply or availability came into focus. The discussion is highly controversial, especially in the case of petroleum. This sub-report presents an analysis of the supply situation of energetic and non-energetic raw materials, i.e. petroleum, coal and nuclear fuels on the one hand as well as iron and steel, chromium, nickel, cobalt, aluminium, magnesium, copper, platinum and platinum metals, industrial minerals, boron salts, phosphate, zirconium and zirconium oxide on the other hand. It is important to discuss also regional availability patterns in order to arrive at a regional picture of potential supply risks and resulting conflicts over raw materials as this is the best way to assess the danger of impending conflicts. (orig.)

  11. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  12. The Effects of Water-Absorbent Materials on Water Supply for Tree Planting in the Semi-Arid Regions

    Directory of Open Access Journals (Sweden)

    Gholam Reza Davarpanah Davarpanah

    2005-03-01

    Full Text Available Numerous studies have so far been focused on increasing irrigation efficiency through such measures as soil moisture retention and soil moisture capacity as well as improving soil physical conditions. In this study, surface runoff reduction, deep penetration of rain water, and use of rain water at irrigation sites with the help of water absorbent chemicals were investigated as measures of supplying for tree water demand and also of reducing drought effects. The absorbent material was purchased from Iran Polymer Research Center. The experimental design included three independent experiments in a completely randomized block design (CRBD with 5 treatments (0, 50, 100, 150 and 200 gr. of the absorbent material and three replications. The tree species used in the experiments were Amygdalus sp., Vitis vinifera, and Pistacia vera. There were 5 experimental units with 4 trees planted 3×3 meters apart. Appropriate amounts of the test material (absorbent were mixed with soil. Three characters of survival including: growth diameter, height, and canopy cover were recorded 4 times a year over two consecutive years. Mstat-c statistical software was used in the statistical analysis (Factor option. Results showed that the tree species had significant differences in their survival due to their genetic and physiological characteristics, so that the species of Vitis vinifera and Pistacia vera recorded the minimum and maximum survival values, respectively. Data collection within the present study is suggested to be continued and similar studies with light and sandy textured soils under greenhouse conditions are needed in order to gain more accurate information on these effects.

  13. 24 CFR 3280.803 - Power supply.

    Science.gov (United States)

    2010-04-01

    ...-Wiring Devices-Dimensional Specifications). (g) The overall length of a power-supply cord, measured from... supply shall be by means of: (1) One mast weatherhead installation installed in accordance with Article... underside of the manufactured home. The manufacturer shall provide in his written installation instructions...

  14. [Importance of material logistics in the interface management of operation departments: is the supply of sterile equipment a new business area of operation room organization?].

    Science.gov (United States)

    Schmeck, J; Schmeck, S B; Kohnen, W; Werner, C; Schäfer, M; Gervais, H

    2008-08-01

    The implementation of diagnosis-related groups (DRGs) sharply increased economic pressure on hospitals. Hence, process optimization was focussed on cost-intensive areas, namely the operation room (OR) departments. Work-flow in the OR is characterized by a mandatory interlocking of the job functions of many different occupational groups and the availability of a variety of different materials. Alternatives for staff assignment optimization have been published in numerous publications dealing with the importance of OR management. In this connection the issue of material logistics in the context of OR management has not been frequently addressed. In order to perform a surgical procedure according to plan, one depends on personnel and on timely availability of the materials needed. Supply of sterilized materials is of utmost importance, because in most hospitals sterilized surgical devices constitute a critical resource. In order to coordinate the OR process with the production flow of sterilized materials, an organizational connection to the OR management makes sense. Hence, in a German university hospital the Department of Hospital Sterile Supplies was integrated into the OR management of the Department of Anesthesiology. This led to a close coordination of work-flow processes, and concomitantly a significant reduction of production costs of sterile supplies could be achieved by direct interaction with the OR. Thus, hospital sterile supplies can reasonably be integrated into an OR management representing a new interesting business area for OR organization.

  15. Recommendation for the design of warehousing installations complementary with storage. Document handed to the Ministry of Ecology, Sustainable Development and Energy within the frame of the National Plan of Management of Radioactive Materials and Wastes 2013-2015

    International Nuclear Information System (INIS)

    2015-01-01

    This report first recalls the guidelines defined by the law of June 2006 related to the sustainable management of radioactive materials and wastes, outlines the complementarity between reversible storage and warehousing, proposes an assessment of studies and researches performed on warehousing, and gives recommendations for the design of warehousing installations complementary with storage. In a second part, the report describes the arrangements in favour of durability of warehousing installations (structure in reinforced concrete, metallic components, and materials used for waste packaging). The control is addressed in the next part: control of waste packages, knowledge acquisition during the warehousing phase, and control of the components of the warehousing installation. The last part addresses the design of warehousing in relationship with storage reversibility, notably for the warehousing of high-level parcels removed from storage (different modes of warehousing are presented) and for the warehousing of intermediate-level-long-lived parcels removed from storage (presentation of the warehousing mode)

  16. The coupling of coal and nuclear energy for the long-term supply of energy and raw materials

    International Nuclear Information System (INIS)

    Knizia, K.

    1986-10-01

    In view of the limited world reserves of fossil fuels and the increase in demand to be expected because of the continued growth of the world population, coal and nuclear energy will have to make an increasing contribution to the energy supply. Their contribution will range from electricity generation to the heat sector and to the raw materials market via various gases obtained from them. The further development towards this field of tasks will lead first via the gasification of coal. It will be carried out autothermally in the first stage of development. The gas produced is suitable for realising considerable improvements in efficiency as compared to coal-fired power stations of present-day design since it will permit the generation of electricity via combined gas turbine/steam turbine processes. Efforts are being made to take further the processes based on this technology by introducing a sodium circuit in addition to the coal gasification, which will make it possible to keep the plants required for coal gasification small. In later stages, this technology will also be suitable for producing a considerable improvement in the diversion of heat at high temperatures from high-temperature reactor nuclear power stations for several purposes. (author)

  17. The application of impedance measurement to assess biofilm development on technical materials used for water supply system construction

    Science.gov (United States)

    Wolf, Mirela; Traczewska, Teodora; Grzebyk, Tomasz

    2017-11-01

    The lack of biological stability of water which is introduced into the network, leads primarily to its secondary contamination during transport to the consumer. The water that is biologically unstable creates ideal conditions for colonization of the inner surface of pipelines by microorganisms and adhesion of their products (biocorrosion). The studies was conducted using the identified microorganisms isolated from the water supply network which accounted inocula in continuous culture of biofilm in CDC reactor. As a result of studies it was revealed the presence of biofilm formed on different materials polyethylene, polypropylene, polyvinyl chloride, polybutylene. Microbiological biodiversity of organisms inhabiting a biofilm of the diversity of nucleic acids was used. It was observed the amount of the psychrophilic bacteria oscillation in the effluent from the reactor. It was also determined the affinity of various bacteria to the plastic through adhesion measurement using impedance spectroscopy. For impedance measurements apparatus SIGNAL RECOVERY 7280 DSP LOCK-IN AMPLIFIER was used, recording impedance components (real and imaginary). The results will allow for the creation of biosensor systems that can be used in predicting health risks in connection with drinking water and taking corrective actions.

  18. The application of impedance measurement to assess biofilm development on technical materials used for water supply system construction

    Directory of Open Access Journals (Sweden)

    Wolf Mirela

    2017-01-01

    Full Text Available The lack of biological stability of water which is introduced into the network, leads primarily to its secondary contamination during transport to the consumer. The water that is biologically unstable creates ideal conditions for colonization of the inner surface of pipelines by microorganisms and adhesion of their products (biocorrosion. The studies was conducted using the identified microorganisms isolated from the water supply network which accounted inocula in continuous culture of biofilm in CDC reactor. As a result of studies it was revealed the presence of biofilm formed on different materials polyethylene, polypropylene, polyvinyl chloride, polybutylene. Microbiological biodiversity of organisms inhabiting a biofilm of the diversity of nucleic acids was used. It was observed the amount of the psychrophilic bacteria oscillation in the effluent from the reactor. It was also determined the affinity of various bacteria to the plastic through adhesion measurement using impedance spectroscopy. For impedance measurements apparatus SIGNAL RECOVERY 7280 DSP LOCK-IN AMPLIFIER was used, recording impedance components (real and imaginary. The results will allow for the creation of biosensor systems that can be used in predicting health risks in connection with drinking water and taking corrective actions.

  19. Development of laser material processing and laser metrology techniques. Development of the power supply of high power CO{sub 2} laser for material processing

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Heon Ju; Lee, Yong Hak; Jang, Do Hyun; Kim, Su Hun [Cheju National University, Cheju (Korea, Republic of)

    1994-08-01

    The 2 Kw solid state RF power supply has been designed and fabricated The power supply was composed of oscillator, driver amplifier and power amplifier. Each part of the power supply was developed and tested. The impedance matching circuit to apply this RF power supply for laser discharge excitation was fabricated also. The RF discharge experiment for the excitation of CO{sub 2} laser was performed. The radiofrequency power supply which has the output power of 2 Kw has been developed. The subsystems of the power supply have been fabricated and their performances were reliable. The RF discharge experiment to generate the laser plasma has been performed and input power density of 6 W/cm{sub 3} has been achieved. (author). 5 refs., 28 figs., 8 tabs.

  20. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  1. The Text of the Agreement connected with the Agency's Assistance to Pakistan in furthering Projects by the Supply of Materials. Supplementary Agreement No. 1

    International Nuclear Information System (INIS)

    1972-01-01

    The text of the Supplementary Agreement No. 1 to the Master Agreement between the Agency and the Government of Pakistan for assistance by the Agency in furthering projects by the supply of materials is reproduced herein for the information of all Members. The Supplementary Agreement entered into force on 16 November 1971.

  2. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  3. Evaluation of several types of curing and protective materials for concrete : final report on part II : installation report and initial condition survey of bridge decks.

    Science.gov (United States)

    1970-01-01

    Thirty-nine test panels were installed on three interstate bridges to evaluate several combinations of curing and protective treatments for concrete. Panels were cured with white pigmented liquid membrane and white polyethylene, both with and without...

  4. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  5. International symposium on uranium production and raw materials for the nuclear fuel cycle - Supply and demand, economics, the environment and energy security. Extended synopses

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The IAEA periodically organizes nical meetings and international symposia on all areas of the uranium production cycle. This publication contains 160 extended synopses related to the 2005 international symposium on 'Uranium Production and Raw Materials for the Nuclear Fuel Cycle - Supply and Demand, Economics, the Environment and Energy Security'. They cover all areas of natural uranium resources and production cycle including uranium supply and demand; uranium geology and deposit; uranium exploration; uranium mining and milling; waste management; and environment and regulation. Each synopsis was indexed individually.

  6. Investigations of nuclei-products formation in target and construction materials of electro-nuclear installations irradiated by 1.5 GeV and 130 MeV photons

    International Nuclear Information System (INIS)

    Titarenko, Y.E.; Karpihin, E.I.; Smolyakov, A.F.

    1996-01-01

    Different versions of installations for transmutation or incineration of actinides and long-lived fission products are being considered nowadays; the source of neutrons in these installations is supposed to be a nuclon-meson cascade arising under interaction of 0.8--1.5 GeV proton beam and the substance of a target. ''Heavy'' materials: eutectics of lead and bismuth or tangsten, are supposed to be used as targets. In correspondence with this, measurements of the cross sections of spallation of nuclides of these materials under impact of the protons of different energies are going on in ITEP. Nuclides used as construction materials for the accelerator are also being measured. Numerical simulation of experimental results with utilization of the codes HETC, INUCLE, CEM95 capable to calculate the process of nuclon- meson cascade in the investigated targets is being carried out

  7. Review of electricity supply failures and plant improvements over 25 years operation of the Harwell materials test reactors

    International Nuclear Information System (INIS)

    Taylor, D.J.

    1986-01-01

    The evolution of the on-site electrical power sources is described, operational experience is reported and shortcomings are identified. Disturbances in the external power supplies to the reactors are listed for the past 25 years and failure probabilities are derived from this historical data. The 132 kV overhead supply to the Harwell site is identified as the source of nearly 90% of the disturbances. (author)

  8. Review of electricity supply failures and plant improvements over 25 years operation of the Harwell materials test reactors

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D. J. [UKAEA Harwell (United Kingdom)

    1986-02-15

    The evolution of the on-site electrical power sources is described, operational experience is reported and shortcomings are identified. Disturbances in the external power supplies to the reactors are listed for the past 25 years and failure probabilities are derived from this historical data. The 132 kV overhead supply to the Harwell site is identified as the source of nearly 90% of the disturbances. (author)

  9. THE CONTROL ALGORITHM OF THE DRYING PROCESS PARTICULATE MATERIALS IN THE APPARATUS WITH THE SWIRLING FLOW OF COOLANT AND MICROWAVE ENERGY SUPPLY

    Directory of Open Access Journals (Sweden)

    S. T. Antipov

    2015-01-01

    Full Text Available The technical task of the process is to improve the drying quality of the final product, increasing the precision and reliability of control, the reduction of specific energy consumption. One of the ways to improve the process is complex and i ts local automation. This paper deals with the problems of development and creation of a new control algorithm drying process of the particulate material. Identified a number of shortcomings of the existing methods of automatic control of the process. As a result, the authors proposed a method for drying particulate materials in the device with swirling flow and the microwave energy supply and its automatic control algorithm. The description of the operating principle of the drying apparatus consists in that the particulate material is wet by using a tangential flow of coolant supplied to the cylinder-drying apparatus which also serves the axial coolant flow, whereby the heat transfer fluid with the particulate material begins to undergo a complex circular movement along the circumference apparatus, thereby increasing its speed and its operation control algorithm. The work of this scheme is carried out at three levels of regulation on the basis of determining the coefficient of efficiency of the dryer, which makes it possible to determine the optimal value of the power equipment and to forecast the cost of electricity. All of the above allows you to get ready for a high quality product while minimizing thermal energy and material costs by optimizing the operating parameters of the drying of the particulate material in the dryer with a combined microwave energy supply and ensure the rational use of heat energy by varying their quantity depending on the characteristics to be dried particulate material and the course of the process.

  10. Raw materials and energy - effects of globalization on the safety of German's supply sufficiency; Rohstoffe und Energie. Auswirkungen der Globalisierung auf die Versorgungssicherheit Deutschlands

    Energy Technology Data Exchange (ETDEWEB)

    Wellmer, F.W. [Technische Univ. Berlin (Germany)

    2001-07-01

    Raw material deposits are not mobile, so globalisation has always been an important element of raw materials production and trade. Raw materials production and transport should be regarded as a large-scale system. Lower freight rates have made overseas transport possible even for bulk raw materials. If we look at Germany's raw materials supply, we find that we are customers buying from the whole world. [German] Da Lagerstaetten ortsgebunden sind, ist Globalisierung seit jeher ein wesentliches Element von Rohstoffgewinnung und handel. Rohstoffgewinnung und Transportmoeglichkeiten muessen als Grosssystem betrachtet werden. Nicht zuletzt wegen der gesunkenen Frachtraten ist der ueberseeische Transport heute selbst fuer Massenrohstoffe moeglich geworden. Betrachtet man die Rohstoffversorgung Deutschlands, wird deutlich, dass wir Kunde der ganzen Welt sind. (orig.)

  11. Ensuring power and raw materials supply. A challenge to politics and economy?; Sichere Energie- und Rohstoffversorgung. Herausforderung fuer Politik und Wirtschaft?

    Energy Technology Data Exchange (ETDEWEB)

    Bardt, H.

    2008-07-01

    In recent years the booming Chinese economy and the expected additional demand from India have led to a significant increase in the need for raw materials. This increase has been accompanied by rising prices for energy feedstocks and mineral resources and a reduction in the availability of certain products. At the same time, there are limits to the expansion of supply, since natural resources are essentially finite. These developments have led to a lively debate among industrialists and politicians on the strategies to be adopted to secure supplies of raw materials. Here, two steps are essential. First, production and consumption must be adapted to higher prices. Secondly, a policy must be developed to combat the protectionism currently prevalent in the international commodity markets, which is in many cases pushing up prices and reducing prosperity. (orig.)

  12. WATER SUPPLY ANALYSIS

    International Nuclear Information System (INIS)

    Clark, R.D.

    1996-01-01

    This analysis defines and evaluates the surface water supply system from the existing J-13 well to the North Portal. This system includes the pipe running from J-13 to a proposed Booster Pump Station at the intersection of H Road and the North Portal access road. Contained herein is an analysis of the proposed Booster Pump Station with a brief description of the system that could be installed to the South Portal and the optional shaft. The tanks that supply the water to the North Portal are sized, and the supply system to the North Portal facilities and up to Topopah Spring North Ramp is defined

  13. The Texts of the Instruments connected with the Agency's Assistance to India in Furthering Projects by the Supply of Materials. Supplementary Agreements Nos 4, 5 and 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1972-04-14

    As a sequel to the assistance which the Agency has provided to the Government of India in furthering projects by the supply of materials, three additional Supplementary Agreements to the Master Agreement concerning the provision of that assistance have been concluded between the Agency and the Government. These Supplementary Agreements entered into force on 1 July 1971, 20 August 1971 and 1 October 1971 respectively, and the texts are reproduced herein for the information of all Members.

  14. The Texts of the Instruments connected with the Agency's Assistance to India in Furthering Projects by the Supply of Materials. Supplementary Agreements Nos 4, 5 and 6

    International Nuclear Information System (INIS)

    1972-01-01

    As a sequel to the assistance which the Agency has provided to the Government of India in furthering projects by the supply of materials, three additional Supplementary Agreements to the Master Agreement concerning the provision of that assistance have been concluded between the Agency and the Government. These Supplementary Agreements entered into force on 1 July 1971, 20 August 1971 and 1 October 1971 respectively, and the texts are reproduced herein for the information of all Members

  15. The Texts of the Instruments connected with the Agency's Assistance to India in Furthering Projects by the Supply of Materials. Second and Third Supplementary Agreements

    International Nuclear Information System (INIS)

    1971-01-01

    As a sequel to the assistance which the Agency has provided to the Government of India in furthering projects by the supply of materials, two additional Supplementary Agreements to the Master Agreement concerning the provision of that assistance have been concluded between the Agency and the Government. These Supplementary Agreements entered into force on 2 July 1970 and 16 November 1970 respectively, and the texts are reproduced herein for the information of all Members

  16. The Texts of the Instruments connected with the Agency's Assistance to Romania in Furthering Projects by the Supply of Materials. Second and Third Supplementary Agreements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1970-02-06

    As a sequel to the assistance which the Agency has provided to the Government of Romania in furthering projects by the supply of materials, two additional Supplementary Agreements to the Master Agreement concerning the provision of that assistance have been concluded between the Agency and the Government. These Agreements entered into force on 4 June 1968 and 21 August 1968 respectively, and the texts are reproduced herein for the information of all Members.

  17. The Texts of the Instruments connected with the Agency's Assistance to Romania in Furthering Projects by the Supply of Materials. Second and Third Supplementary Agreements

    International Nuclear Information System (INIS)

    1970-01-01

    As a sequel to the assistance which the Agency has provided to the Government of Romania in furthering projects by the supply of materials, two additional Supplementary Agreements to the Master Agreement concerning the provision of that assistance have been concluded between the Agency and the Government. These Agreements entered into force on 4 June 1968 and 21 August 1968 respectively, and the texts are reproduced herein for the information of all Members

  18. Filter to be tightly installed in a room as a partition and which can be filled with a contact material susceptible of being poured e.g. activated charcoal for cleaning especially radioactive air or gases in nuclear installations

    International Nuclear Information System (INIS)

    Neumann, G.M.

    1978-01-01

    The filter is designed in such manner that it will resist all loads - including earthquake - without loosing its operability. It consists of a box formed by stable corner irons filled with absorbing material and bounded on two sides by sieves through which the radioactive gases can flow in and out. The invention especially concerns the configuration of the perforations and the screwing of the casing elements to the frame as well as the arrangement in the concrete wall. Measures for fire fighting are also provided for. (UWI) [de

  19. 41 CFR 101-42.1101 - Federal supply classification (FSC) groups and classes which contain hazardous materials.

    Science.gov (United States)

    2010-07-01

    ..., building paper, and thermal insulation materials Asbestos cloth which has loose fibers or particles that... shipment. 5965 Headsets, handsets, microphones, and speakers Items containing magnetic material. 5970... hazardous chemicals, solvents. 6625 Electrical and electronic properties measuring and testing instruments...

  20. The effect of cleanliness control during installation work on the amount of accumulated dust in ducts of new HVAC installations.

    Science.gov (United States)

    Holopainen, R; Tuomainen, M; Asikainen, V; Pasanen, P; Säteri, J; Seppänen, O

    2002-09-01

    The aim of this study was to evaluate the amount of dust in supply air ducts in recently installed ventilation systems. The samples for the determination of dust accumulation were collected from supply air ducts in 18 new buildings that have been constructed according to two different cleanliness control levels classified as category P1 (low oil residues and protected against contaminations) and category P2, as defined in the Classification of Indoor Climate, Construction and Building Materials. In the ducts installed according to the requirements of cleanliness category P1 the mean amount of accumulated dust was 0.9 g/m2 (0.4-2.9 g/m2), and in the ducts installed according to the cleanliness category P2 it was 2.3 g/m2 (1.2-4.9 g/m2). A significant difference was found in the mean amounts of dust between ducts of categories P1 and P2 (P < 0.008). The cleanliness control procedure in category P1 proved to be a useful and effective tool for preventing dust accumulation in new air ducts during the construction process. Additionally, the ducts without residual oil had lower amounts of accumulated dust indicating that the demand for oil free components in the cleanliness classification is reasonable.

  1. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  2. Control Analysis Of Tobacco Raw Material Supplies Using Eoq Method Economic Order Quantity To Reach Efficiency Total Costs Of Raw Material In Pr. Sukun

    Directory of Open Access Journals (Sweden)

    Wiwik Sudarwati

    2017-07-01

    Full Text Available The raw material inventory control system determines and guarantees the availability of raw material stock in the right quantity quality and timing. The problem in this research is the procurement of raw materials of tobacco. PR. Sukun still often experiences the excess. This is related to the frequency of raw material purchases and the quantity of raw material purchases which can lead to waste of working capital embedded in raw material inventory raw material ordering costs and raw material storage costs. The purpose of this research is to know how to make an efficiency level in procurement of raw material inventory between EOQ method compared with policy of PR. Sukun. The type of research used is analytic descriptive type. Data analysis begins by analyzing raw material quantity comparison total raw material inventory cost and raw material cost between PR Sukun policy with EOQ method. Based on the results of research known that by using EOQ method can be much more efficient compared to policy of PR. Sukun. The quantity and frequency of purchasing raw materials is less but still take into account the safety stock and reorder point so the production process is not disturbed. In addition the cost of purchasing ordering costs and raw materials storage costs less so as to create efficiencies on the cost of raw materials inventory. PR. Sukun in the procurement of raw material inventory should use EOQ method to be more efficient and take into account the safety stock and reorder point to avoid the inventory excess of raw materials.

  3. Technology assessment of solar-energy systems. Materials resource and hazardous materials impacts of solar deployment

    Science.gov (United States)

    Schiffman, Y. M.; Tahami, J. E.

    1982-04-01

    The materials-resource and hazardous-materials impacts were determined by examining the type and quantity of materials used in the manufacture, construction, installation, operation and maintenance of solar systems. The materials requirements were compared with US materials supply and demand data to determine if potential problems exist in terms of future availability of domestic supply and increased dependence on foreign sources of supply. Hazardous materials were evaluated in terms of public and occupational health hazards and explosive and fire hazards. It is concluded that: although large amounts of materials would be required, the US had sufficient industrial capacity to produce those materials; (2) postulated growth in solar technology deployment during the period 1995-2000 could cause some production shortfalls in the steel and copper industry; the U.S. could increase its import reliance for certain materials such as silver, iron ore, and copper; however, shifts to other materials such as aluminum and polyvinylchloride could alleviate some of these problems.

  4. Discrete element modeling of the mass movement and loose material supplying the gully process of a debris avalanche in the Bayi Gully, Southwest China

    Science.gov (United States)

    Zhou, Jia-wen; Huang, Kang-xin; Shi, Chong; Hao, Ming-hui; Guo, Chao-xu

    2015-03-01

    The dynamic process of a debris avalanche in mountainous areas is influenced by the landslide volume, topographical conditions, mass-material composition, mechanical properties and other factors. A good understanding of the mass movement and loose material supplying the gully process is very important for understanding the dynamic properties of debris avalanches. Three-dimensional particle flow code (PFC3D) was used to simulate a debris avalanche in Quaternary deposits at the Bayi Gully, Southwest China. FORTRAN and AutoCAD were used for the secondary development to display the mass movement process and to quantitatively describe the mass movement and loose material supplying the gully process. The simulated results show that after the landslide is initiated, the gravitational potential energy is converted into kinetic energy with a variation velocity for the sliding masses. Two stages exist for the average-movement velocity: the acceleration stage and the slowdown stage, which are influenced by the topographical conditions. For the loose materials supplying the gully process, the cumulative volume of the sliding masses into the gully gradually increases over the time. When the landslide volume is not large enough, the increasing landslide volume does not obviously influence the movement process of the sliding masses. The travel distance and movement velocity increase with the decreasing numerical parameters, and the mass-movement process is finished more quickly using low-value parameters. The deposition area of the sliding masses decreases with the increasing numerical parameters and the corresponding deposition thickness increases. The mass movement of the debris avalanche is not only influenced by the mechanical parameters but is also controlled by the topographical conditions.

  5. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  6. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  7. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  8. The expansion of nuclear energy in industrialized and developing countries: Reasons, market shares, fissile material supply and waste management

    International Nuclear Information System (INIS)

    Schwarz, D.

    1992-01-01

    At present there are more ethical-anthropological reasons than economic ones which speak for an expansion of nuclear energy: Ecological, climatic, peace and resource policy problems which most porbably will be unsolvable by real human beings and expensive methods leaving out nuclear energy. The risks resulting from that exceed by several orders of magnitude the risk which would be involved in the operation of various thousands of modern nuclear power plants. Most of the nuclear power plants are and will be operated today and tomorrow in industrialized countries; however, some of them are running already today in several threshold countries. Therefore the safety of nuclear power plants must be such as to permit their construction anywhere. Together with intensified saving, nuclear energy can solve energy policy problems in all sectors of the energy market predominantly in a non-fossil way, namely by taking over almost the entire power generation, by economical application of power instead of fossil fuels, rendering at the same time a large number of energy services, and supplying process and heating heat. Uranium supply will be solved internationally by prospection and increased uranium exploitation, or by the breeder, at economically reasonable cost. Safe waste management is technically feasible. Lack of acceptance neccessitates at present safe intermediate storage at reasonable cost. When discussing this question the ethical aspect of nuclear energy expansion should be stressed. (orig./UA) [de

  9. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  10. Safety reassessment of the old installations involved in fuel cycle

    Energy Technology Data Exchange (ETDEWEB)

    Guillard, M

    2003-01-01

    Since the early 1990's, CEA (French atomic energy commission) has been preparing a plan for the renovation of a laboratory situated at Cadarache and dedicated to the study of irradiated materials and fuels. The main aim of this renovation was the improvement of the seismic behaviour of the laboratory since it was not built according to the para-seismic rules now in force. The solution chosen, given the different projects studied, the provisional unavailability of the plant and the related costs, was a partial reinforcement of the building in association with a limited plant life time and the reduction of activities in the oldest part of the installation. Another aim of this renovation was a global upgrading of the safety concerning: -) radioactive material containment (upgrade of the first static barrier by reinforcing cell leak-proofing, installation of a second level of very high efficiency filtration at the cell outputs, and separation of cell and general building ventilation networks; -) fire protection (fire sectoring with the isolation of the premises involving safety-important equipment, replacement of the automatic fire detection system, and definition of a new piloting of ventilation in case of fire); -) power cut risks (installation of permanent sources for the power supply of safety-important equipment); and -) earthquake behaviour (addition of reinforced connections between the 3 parts of the building, strengthening of peripheral walls, widening of joints between cells and building, and reinforcement of the foundation of the concrete cells). (A.C.)

  11. Safety reassessment of the old installations involved in fuel cycle

    International Nuclear Information System (INIS)

    Guillard, M.

    2003-01-01

    Since the early 1990's, CEA (French atomic energy commission) has been preparing a plan for the renovation of a laboratory situated at Cadarache and dedicated to the study of irradiated materials and fuels. The main aim of this renovation was the improvement of the seismic behaviour of the laboratory since it was not built according to the para-seismic rules now in force. The solution chosen, given the different projects studied, the provisional unavailability of the plant and the related costs, was a partial reinforcement of the building in association with a limited plant life time and the reduction of activities in the oldest part of the installation. Another aim of this renovation was a global upgrading of the safety concerning: -) radioactive material containment (upgrade of the first static barrier by reinforcing cell leak-proofing, installation of a second level of very high efficiency filtration at the cell outputs, and separation of cell and general building ventilation networks; -) fire protection (fire sectoring with the isolation of the premises involving safety-important equipment, replacement of the automatic fire detection system, and definition of a new piloting of ventilation in case of fire); -) power cut risks (installation of permanent sources for the power supply of safety-important equipment); and -) earthquake behaviour (addition of reinforced connections between the 3 parts of the building, strengthening of peripheral walls, widening of joints between cells and building, and reinforcement of the foundation of the concrete cells). (A.C.)

  12. Ministerial Decree of 3 March 1978 approving the general conditions of the third party liability insurance policy for operators of nuclear installations and the general conditions of insurance policies for third party liability for transport of nuclear materials

    International Nuclear Information System (INIS)

    1978-01-01

    This Decree by the Ministry for Industry, Commerce and Crafts and the Ministry for transport of Italy was made in implementation of Section 2 of the Decree No. 519 by the president of the Republic of 2 May 1975 amending Section 15 to 24 of Act No. 1860 of 31 December 1962 on the Peaceful Uses of Nuclear Energy. This present Decree approves the general conditions of third party liability insurance policies for operators of nuclear installations and for transport of radioactive materials. (NEA) [fr

  13. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  14. The text of the Agreement of 22 September 1982 between Chile and the Agency for the application of safeguards in connection with the supply of nuclear material from the United Kingdom of Great Britain and Northern Ireland

    International Nuclear Information System (INIS)

    1983-07-01

    The full text of the agreement of 22 September 1982 between Chile and the Agency for the application of safeguards to nuclear material supplied from the United Kingdom of Great Britain and Northern Ireland is presented

  15. The legal regime of nuclear materials supply and international safeguards laid down in the EURATOM treaty, and how it has been modified by subsequent practice

    International Nuclear Information System (INIS)

    Manig, W.

    1993-01-01

    Practice deviating from the authentic text of the EURATOM treaty is lawful only when based on official and accepted interpretation of the EURATOM treaty, or on amendment by accepted practice. According to Art. 204 of the Constituent Act, amendments require governmental consent and ratification. The chapters of the EURATOM treaty dealing with nuclear materials supply and nuclear safeguards have been made subject to simplified procedures of revision. The procedures of revision stipulated in the treaty do not altogether rule out amendment based on principles other than those stipulated. The European Communities do not have the status of a federation, so that Member States have a vital say in procedures for revision of the Communities' constituent acts. They have the right to initiate and adopt amendments by procedures not mentioned in the treaty. Constituent acts of international organisations, particularly of those endowed with supranational authority, like EURATOM, may only be modified if the interests of the organisation, normally safeguarded by its bodies, are left untouched. Amendments must not be put down in writing. There is the possibility of tacit amendment, if the common practice reflects a consensus among all parties concerned about the particular amendment. Such amendment by continuous, common practice is subject to the general constraints governing amendment of the constituent acts of the three European Communities (participation of the bodies of the organisation, acquis communautaire). The amendments relating to nuclear materials supply and the international safeguards which have been created by practice are in line with these provisions, as the Commission, the Council, Member States and the supply agency are practising the amended procedures, so that the amendments of chapters VI and VII of the Constituent Act of EURATOM, as expressed in practice, are legally effective. (orig./HP) [de

  16. Radioactive waste warehousing site installation - INB 56, Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the installation located in Cadarache and used for radioactive waste warehousing (description, radioactive and chemical materials, specific risks, present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, margin assessment), external flooding (installation sizing, margin assessment in relationship with the different flooding origins), other extreme natural events (hail, extreme rainfalls, strong winds, lightning, and earthquake exceeding the design level), loss of electric supplies. The next parts address severe accident management (means and organization for crisis management, robustness of available means), and subcontracting conditions and practices

  17. 49 CFR 236.516 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  18. 47 CFR 80.1015 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Power supply. 80.1015 Section 80.1015... MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1015 Power supply. (a) There must be readily available for use under normal load conditions, a power supply sufficient...

  19. Longer-term domestic supply problems for nonrenewable materials with special emphasis on energy-related applications

    International Nuclear Information System (INIS)

    Goeller, H.E.

    1980-01-01

    An examination is made on how materials are used in present and future energy production and use. Problem areas which are discussed include by-products production, import limitations, substitution and recycle, accelerated use, synthesis, and the adequacy of the data bases availability

  20. Installation of a power supply system: The simple and low-cost way. Blocking oscillator with high performance factor; Aufbau einer Stromversorgung - einfach und preisguenstig. Realisierung eines Sperrwandlers mit hohem Leistungsfaktor

    Energy Technology Data Exchange (ETDEWEB)

    Adragna, C [SGS-Thomson Microelectronics, Agrate (Italy)

    1998-05-26

    There are several ways of constructing power supply systems with power factor correction. The two most common ways for PWM-based control are : Control via fixed-frequency average current or transition mode control. The former is more efficient but also much more costly. In the range below 150 W, a TM solution is the method of choice. (orig.) [Deutsch] Stromversorgungen mit Leistungsfaktor-Korrektur lassen sich auf verschiedene Arten realisieren. Die zwei gebraeuchlichsten Methoden fuer eine PWM-basierte Regelung sind: Regelung ueber den Festfrequenz-Strommittelwert oder der Transition Mode. Waehrend erstere leistungsfaehiger, aber auch erheblich aufwendiger ist, laesst sich letztere wesentlich billiger umsetzen. Im Leistungsbereich unter 150 W bietet sich eine TM-Loesung an. (orig.)

  1. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  2. Trends and perspectives of raw materials supply in Germany in the 21st millennium. Colloquium 5. Conference report; Trends und Perspektiven der Rohstoffversorgung Deutschlands im 21. Jahrhundert. Kolloquium 5. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    Slaby, D; Brezinski, H [comps.; Technische Univ. Bergakademie Freiberg (Germany). Fakultaet fuer Wirtschaftswissenschaften; Gerhardt, H [comp.; Technische Univ. Bergakademie Freiberg (Germany). Inst. fuer Bergbau; Herzig, P [comp.; Technische Univ. Bergakademie Freiberg (Germany). Inst. fuer Mineralogie

    1999-07-01

    The conference report comprises papers on raw materials policy and management, coal mining in Poland and Czekhia, perspectives of raw materials supply in Germany, mining law and raw materials supply, information systems for regional planning, and the use of washery tailings as construction materials. Ten papers have been recorded separately in the ENERGY database. [German] Der Tagungsband enthaelt Beitraege, die neben der Energierohstoffpolitik, die Rohstoffwirtschaft, den Kohlenbergbau in Polen und Tschechien betreffen. Es werden Perpesktiven der Rohstoffversorgung Deutschlands in der Zukunft sowie Bergrecht und Rohstoffsicherung diskutiert. Weitere Arbeiten betreffen Informationssyteme zur Regionalplannung sowie die Verwertung von Waschbergen als Baustoffersatz. Fuer die Datenbank Energy wurden zehn Beitraege separat aufgenommen.

  3. MANAGEMENT PROCEDURE OF SUPPLIES OF UNITS, MATERIALS AND CONSTITUENT PARTS FOR REPAIR AND MAINTENANCE SUPPORT OF TRANSPORT AND PRODUCTION MACHINES

    Directory of Open Access Journals (Sweden)

    Victor Yurievich Stroganov

    2017-05-01

    Full Text Available This article considers a question of creation of schemes and sequence of passing of the main stages of process of execution of repair and maintenance works order taking into account formation of stocks of necessary spare parts, materials and constituent parts. Models of an input stream are offered for inventory control system, which are rather adequately described by autoregressive models of order two.

  4. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  5. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  6. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Jungmann, A.

    1976-01-01

    A nuclear reactor metal pressure vessel is surrounded by a concrete wall forming an annular space around the vessel. Thermal insulation is in this space and surrounds the vessel, and a coolant-conductive layer is also in this space surrounding the thermal insulation, coolant forced through this layer reducing the thermal stress on the concrete wall. The coolant-conductive layer is formed by concrete blocks laid together and having coolant passages, these blocks being small enough individually to permit them to be cast from concrete at the reactor installation, the thermal insulation being formed by much larger sheet-metal clad concrete segments. Mortar is injected between the interfaces of the coolant-conductive layer and concrete wall and the interfaces between the fluid-conductive layer and the insulation, a layer of slippery sheet material being interposed between the insulation and the mortar. When the pressure vessel is thermally expanded by reactor operation, the annular space between it and the concrete wall is completely filled by these components so that zero-excursion rupture safeguard is provided for the vessel. 4 claims, 1 figure

  7. PV supply chain growing pains

    Energy Technology Data Exchange (ETDEWEB)

    Wilkins, A. [Matrix Energy Inc., Montreal, PQ (Canada)

    2010-11-15

    This article discussed issues involving the supply chain for photovoltaic (PV) equipment that is emerging in Ontario as a result of the Feed-in-Tariff (FIT) program that was launched in late 2009. The rapidly developing PV supply chain may not be taking a sustainable path. The domestic-content requirement is making manufacturers outlay capital to set up manufacturing in Ontario without reliable market data. Only a small number of dealer/installers have any meaningful experience designing and installing grid-tie PV. Until recently, wholesale distributors designed and supplied most grid-tie PV systems in Canada, and solar dealers/installers or electricians or electrical contractors did the installation. Instead of selling directly to dealer/installers, solar manufacturers should develop strong relationships with wholesalers, who have system design experience and product training. This would allow manufacturers to focus on their core strength, reach more customers, and keep lower inventory levels. Wholesale distributors in turn provide dealer/installers with expertise in product and system design, training from a range of manufacturers, marketing and logistics support, and immediate access to inventory. Manufacturers generally lack appropriate accounting, engineering, marketing, and logistics services to deal with a multitude of active accounts, and they are not structured to work with architects and engineers to do complete system design. Partnering with wholesale distributors allows manufacturers to take on the residential and small-scale commercial sectors by building brand awareness and increasing market share and sales across Canada. 2 figs.

  8. PV supply chain growing pains

    International Nuclear Information System (INIS)

    Wilkins, A.

    2010-01-01

    This article discussed issues involving the supply chain for photovoltaic (PV) equipment that is emerging in Ontario as a result of the Feed-in-Tariff (FIT) program that was launched in late 2009. The rapidly developing PV supply chain may not be taking a sustainable path. The domestic-content requirement is making manufacturers outlay capital to set up manufacturing in Ontario without reliable market data. Only a small number of dealer/installers have any meaningful experience designing and installing grid-tie PV. Until recently, wholesale distributors designed and supplied most grid-tie PV systems in Canada, and solar dealers/installers or electricians or electrical contractors did the installation. Instead of selling directly to dealer/installers, solar manufacturers should develop strong relationships with wholesalers, who have system design experience and product training. This would allow manufacturers to focus on their core strength, reach more customers, and keep lower inventory levels. Wholesale distributors in turn provide dealer/installers with expertise in product and system design, training from a range of manufacturers, marketing and logistics support, and immediate access to inventory. Manufacturers generally lack appropriate accounting, engineering, marketing, and logistics services to deal with a multitude of active accounts, and they are not structured to work with architects and engineers to do complete system design. Partnering with wholesale distributors allows manufacturers to take on the residential and small-scale commercial sectors by building brand awareness and increasing market share and sales across Canada. 2 figs.

  9. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  10. Raw materials for the energy supply of the future. Geology, markets, environmental influences; Rohstoffe fuer die Energieversorgung der Zukunft. Geologie, Maerkte, Umwelteinfluesse

    Energy Technology Data Exchange (ETDEWEB)

    Hagelueken, Christian [Umicore, Hanau-Wolfgang (Germany); Thauer, Rudolf K. [Max-Planck-Institut fuer Terrestrische Mikrobiologie, Marburg (Germany); Buchholz, Peter [Bundesanstalt fuer Geowissenschaften und Rohstoffe, Hannover (Germany). Deutsche Rohstoffagentur; Herzig, Peter [GEOMAR Helmholtz-Zentrum fuer Ozeanforschung Kiel (Germany); Gutzmer, Jens [Technische Univ. Bergakademie Freiberg (Germany); Helmholtz-Institut Freiberg fuer Ressourcentechnologie (Germany); Littke, Ralf [Rheinisch-Westfaelische Technische Hochschule (RWTH), Aachen (Germany); Angerer, Gerhard; Wellmer, Friedrich-Wilhelm

    2015-11-15

    More and more metals are needed to expand modern energy technologies, but we can not completely dispense with fossil raw materials and biomass in the near future either. Are the incidence of the conversion of energy sources sufficient? The analysis of the academy project ''Energy Systems of the Future'' (ESYS) comes to the conclusion that geologically enough raw materials are available. The challenge, however, is to make the supply safe, affordable and environmentally and socially compatible. The analysis explains the mechanisms of action on the global commodity markets and identifies supply risks. These include, for example, sudden demand on the international markets as well as the unequal distribution of the world's raw material reserves. This is followed by the analysis approaches, in order to recognize warning signals for potential raw material bottlenecks in time, to develop evasive strategies and to secure the raw material supply for the energy turnarounds. For example, the expansion of recycling can help to reduce the dependence on metal imports. In mining, on the other hand, innovative technologies have to be developed in order to improve the exploration and utilization of the deposits. By establishing binding environmental and social standards, the extraction of raw materials could also become more sustainable. The analysis also highlights the importance of bioenergy and fossil raw materials, such as oil and natural gas, for energy generation. The authors describe the advantages and disadvantages of these energy carriers and the measures that can be used to reduce environmental pollution such as greenhouse gas emissions. [German] Fuer den Ausbau moderner Energietechnologien werden immer mehr Metalle benoetigt, doch auch auf fossile Rohstoffe und Biomasse koennen wir in naher Zukunft nicht vollstaendig verzichten. Reichen die Vorkommen zur Umsetzung der Energiewende aus? Die Analyse des Akademienprojekts &apos

  11. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  12. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  13. International symposium on uranium raw material for the nuclear fuel cycle: Exploration, mining, production, supply and demand, economics and environmental issues (URAM-2009). Book of abstracts

    International Nuclear Information System (INIS)

    2009-01-01

    The International Symposium on Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues (URAM-2009) addressed all aspects of the uranium fuel cycle, from the availability of raw materials to the long-term sustainability of nuclear power. The revival of the uranium industry in recent years has caused a dramatic increase in uranium exploration and mining activities in several countries. URAM-2009 was intended to bring together scientists, exploration and mining geologists, engineers, operators, regulators and fuel cycle specialists to exchange information and discuss updated research and current issues in uranium geology and deposits, exploration, mining and processing, production economics, and environmental and legal issues. Contributed papers covered uranium markets and economics (including supply and demand); social licensing in the uranium production cycle; uranium exploration (including uranium geology and deposits); uranium mining and processing; environmental and regulatory issues; human resources development. There was a poster session throughout the symposium, as well as an exhibition of topical photographs. A workshop on recent developments in Technical Cooperation Projects relevant to the Uranium Production Cycle area was also organized. On the last day of the symposium, there was an experts' Panel Discussion. The presentations and discussions at URAM-2009 (a) led to a better understanding of the adequacy of uranium sources (both primary and secondary) to meet future demand, (b) provided information on new exploration concepts, knowledge and technologies that will potentially lead to the discovery and development of new uranium resources, (c) described new production technology having the potential to more efficiently and economically exploit new uranium resources; (d) documented the environmental compatibility of uranium production and the overall effectiveness of the final

  14. An Integrated Carbon Policy-Based Interactive Strategy for Carbon Reduction and Economic Development in a Construction Material Supply Chain

    Directory of Open Access Journals (Sweden)

    Liming Zhang

    2017-11-01

    Full Text Available Carbon emissions from the construction material industry have become of increasing concern due to increasingly urbanization and extensive infrastructure. Faced with serious atmospheric deterioration, governments have been seeking to reduce carbon emissions, with carbon trading and carbon taxes being considered the most effective regulatory policies. Over time, there has been a global consensus that integrated carbon trading/carbon tax policies are more effective in reducing carbon emissions. However, in an integrated carbon reduction policy framework, balancing the relationship between emission reductions and low-carbon benefits has been found to be a critical issue for governments and enterprises in both theoretical research and carbon emission reduction practices. As few papers have sought to address these issues, this paper seeks to reach a trade-off between economic development and environmental protection involving various stakeholders: regional governments which aim to maximize social benefits, and producers who seek economic profit maximization. An iterative interactive algorithmic method with fuzzy random variables (FRVs is proposed to determine the satisfactory equilibrium between these decision-makers. This methodology is then applied to a real-world case to demonstrate its practicality and efficiency.

  15. Biofouling potential and material reactivity in a simulated water distribution network supplied with stormwater recycled via managed aquifer recharge.

    Science.gov (United States)

    Gonzalez, Dennis; Tjandraatmadja, Grace; Barry, Karen; Vanderzalm, Joanne; Kaksonen, Anna H; Dillon, Peter; Puzon, Geoff J; Sidhu, Jatinder; Wylie, Jason; Goodman, Nigel; Low, Jason

    2016-11-15

    The injection of stormwater into aquifers for storage and recovery during high water demand periods is a promising technology for augmenting conventional water reserves. Limited information exists regarding the potential impact of aquifer treated stormwater in distribution system infrastructure. This study describes a one year pilot distribution pipe network trial to determine the biofouling potential for cement, copper and polyvinyl chloride pipe materials exposed to stormwater stored in a limestone aquifer compared to an identical drinking water rig. Median alkalinity (123 mg/L) and colour (12 HU) in stormwater was significantly higher than in drinking water (82 mg/L and 1 HU) and pipe discolouration was more evident for stormwater samples. X-ray Diffraction and Fluorescence analyses confirmed this was driven by the presence of iron rich amorphous compounds in more thickly deposited sediments also consistent with significantly higher median levels of iron (∼0.56 mg/L) in stormwater compared to drinking water (∼0.17 mg/L). Water type did not influence biofilm development as determined by microbial density but faecal indicators were significantly higher for polyvinyl chloride and cement exposed to stormwater. Treatment to remove iron through aeration and filtration would reduce the potential for sediment accumulation. Operational and verification monitoring parameters to manage scaling, corrosion, colour, turbidity and microbial growth in recycled stormwater distribution networks are discussed. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  16. Terrigenous material supply to the Peruvian central continental shelf (Pisco, 14° S) during the last 1000 years: paleoclimatic implications

    Science.gov (United States)

    Briceño-Zuluaga, Francisco Javier; Sifeddine, Abdelfettah; Caquineau, Sandrine; Cardich, Jorge; Salvatteci, Renato; Gutierrez, Dimitri; Ortlieb, Luc; Velazco, Federico; Boucher, Hugues; Machado, Carine

    2016-03-01

    In the eastern Pacific, lithogenic input to the ocean responds to variations in the atmospheric and oceanic system and their teleconnections over different timescales. Atmospheric (e.g., wind fields), hydrological (e.g., fresh water plumes) and oceanic (e.g., currents) conditions determine the transport mode and the amount of lithogenic material transported from the continent to the continental shelf. Here, we present the grain size distribution of a composite record of two laminated sediment cores retrieved from the Peruvian continental shelf that record the last ˜ 1000 years at a sub-decadal to centennial time-series resolution. We propose novel grain size indicators of wind intensity and fluvial input that allow reconstructing the oceanic-atmospheric variability modulated by sub-decadal to centennial changes in climatic conditions. Four grain size modes were identified. Two are linked to aeolian inputs (M3: ˜ 54; M4: ˜ 91 µm on average), the third is interpreted as a marker of sediment discharge (M2: ˜ 10 µm on average), and the last is without an associated origin (M1: ˜ 3 µm). The coarsest components (M3 and M4) dominated during the Medieval Climate Anomaly (MCA) and the Current Warm Period (CWP) periods, suggesting that aeolian transport increased as a consequence of surface wind stress intensification. In contrast, M2 displays an opposite behavior, exhibiting an increase in fluvial terrigenous input during the Little Ice Age (LIA) in response to more humid conditions associated with El Niño-like conditions. Comparison with other South American paleoclimate records indicates that the observed changes are driven by interactions between meridional displacement of the Intertropical Convergence Zone (ITCZ), the South Pacific Subtropical High (SPSH) and Walker circulation at decadal and centennial timescales.

  17. Terrigeneous material supply to the Peruvian central continental shelf (Pisco 14° S) during the last 1100 yr: paleoclimatic implications

    Science.gov (United States)

    Briceño Zuluaga, F.; Sifeddine, A.; Caquineau, S.; Cardich, J.; Salvatteci, R.; Gutierrez, D.; Ortlieb, L.; Velazco, F.; Boucher, H.; Machado, C.

    2015-07-01

    In the Eastern Pacific, lithogenic input to the ocean is a response of the atmospheric and ocean system variability and their teleconnections over different timescales. Atmospheric (e.g., wind fields, precipitation), hydrological (e.g., fresh water plumes) and oceanic (e.g., currents) conditions determine the transport mode and the amount of lithogenic material transported from the continent to the continental shelf. Here, we present the grain size distribution of a composite record of two laminated sediment cores retrieved in the Peruvian continental shelf, covering the last ~1100 yr at sub-decadal to centennial time-series resolution. We then discuss the paleo-environmental significance and the climatic mechanisms involved. Four grain size modes were identified. Two are linked to aeolian inputs (M3: 53.0 μm and M4: 90.8 μm on average), the third is interpreted as a marker of sediment discharge (M2: 9.4 μm on average), and the last is without an associated origin (M1: ~3 μm). The coarsest components (M3 and M4) dominated during the Medieval Climate Anomaly (MCA) and Current Warm Period (CWP) periods, suggesting that aeolian transport increased as consequence of wind stress intensification. In contrast, M2 displays an opposite behavior, exhibiting an increase in fluvial terrigenous input during the Little Ice Age (LIA), in response to more humid conditions. Comparison with other South American paleoclimate records indicates that the observed changes are driven by interactions between meridional displacement of the Intertropical convergence zone (ITCZ) and of the South Pacific Sub-tropical High (SPSH) at decadal and centennial time scales.

  18. Parameter design for a phase change material board installed on the inner surface of building exterior envelopes for cooling in China

    International Nuclear Information System (INIS)

    Sun, Xiaoqin; Zhang, Quan; Medina, Mario A.; Lee, Kyoung Ok; Liao, Shuguang

    2016-01-01

    Highlights: • Phase change material (PCM) boards were simulated in building envelopes. • The buildings were located in four cities with different climatic conditions. • Energy and mass efficiency was proposed to evaluate utilization of PCM board. • The optimal melting temperature increased with increasing mean air temperature. - Abstract: Phase change materials (PCMs) can be used for building envelope thermal management and for energy conservation because of their potential to absorb and release large amounts of heat with small wall temperature variations. In this paper, the heat transfer theory of a PCM board used for building envelopes is presented, together with a mathematical model based on the moving heat-source method. It was found that the model accurately predicted the position of the solid–liquid interface in time and space, comparing with the published data. Energy and mass efficiency (EME) was proposed to evaluate the energy efficiency of PCM boards in office buildings located in various climatic regions in China for cooling. The influences on EME of parameters, including melting temperature of PCM, PCM board thickness and the heat transfer coefficient of building envelope, were analyzed. The optimal melting temperatures of PCM board, which resulted in the peak EME, in office building were 24.1 °C in Shenyang, 25.0 °C in Kunming, 25.3 °C in Zhengzhou and 25.5 °C Changsha, respectively. The EME increased with the increasing heat transfer coefficient of building envelope. For the city of Changsha with higher outdoor air temperature, none of the PCM boards modeled contributed effectively.

  19. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  20. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  1. Accelerated Logistics: Streamlining the Army's Supply Chain

    National Research Council Canada - National Science Library

    Wang, Mark

    2000-01-01

    ...) initiative, the Army has dramatically streamlined its supply chain, cutting order and ship times for repair parts by nearly two-thirds nationwide and over 75 percent at several of the major Forces Command (FORSCOM) installations...

  2. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  3. Comparative study of fix-installed monitoring instruments and its application in detecting uncontrolled trafficking of radioactive materials at airports; Estudio comparativo de equipos fijos de pedestal y su aplicacion en la detecciond el trafico incontrolado de material radiactivo en aeropuertos

    Energy Technology Data Exchange (ETDEWEB)

    Pujol, L.; Suarez-Navarro, M. J.; Gonzalez-Gonzalez, J. A.; Garcia-Galludo, M.

    2010-07-01

    In this paper we analyze the response of three commercial equipment designed to detect illicit trafficking or inadvertent movement of radioactive materials at airports when carried by passengers. We compared three fix-installed instruments: APM (Bicron), GR-606 (Exploranium), and FHT-1372 (Thermo Eberline). In this initial evaluation conducted at the Laboratory of Nuclear engineering of the School of Civil Engineering, it was observed that the FHT-1372 introduced a fester detection response, sensitive and allowed the measurement of total dose rate and artificial dose rate. This equipment was installed at the exit from customs passenger of Barajas international airport operating for a period of 108 days in 2002 with a total number of 1,339,931 people. this period was divided into 5 sessions to establish suitable investigation levels to detect a possible incident of radioactive material, which was finally set at 110 nSv/h to total dose rate and 25 nSv/h for artificial dose rate. During this period 39 possible incidents were detected above the investigation level established, 5 of them with a value 10 times the environmental background of the room where the equipment was installed (about 90 nSv/h), and no level exceeded 100 {mu}Sv/h at 1 m distance, which is the limit for legal transport of radioactive materials from the International Atomic Energy Agency (IAEA). (Author) 17 refs.

  4. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  5. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  6. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  7. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  8. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  9. Condition based spare parts supply

    NARCIS (Netherlands)

    Lin, X.; Basten, Robertus Johannes Ida; Kranenburg, A.A.; van Houtum, Geert-Jan

    2012-01-01

    We consider a spare parts stock point that serves an installed base of machines. Each machine contains the same critical component, whose degradation behavior is described by a Markov process. We consider condition based spare parts supply, and show that an optimal, condition based inventory policy

  10. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  11. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  12. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  13. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  14. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  15. 46 CFR 169.688 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...

  16. Strategic Supply

    National Research Council Canada - National Science Library

    Alexander, Kelly; Cole, Heather; Cural, Ahmet; Daugherty, Darryl; Howard, Russell; Keane, Thomas; Louie, K. Y; McNeely, Rosa; Mordente, Patrick; Petrillo, Robert

    2006-01-01

    ...; but rather, as an enabler across all industries. Therefore, this industry study looked at Strategic Supply as an integrated process performed by industries to obtain comparative and competitive advantage in the global marketplace...

  17. Strategic Supply

    National Research Council Canada - National Science Library

    Alexander, Kelly; Cole, Heather; Cural, Ahmet; Daugherty, Darryl; Howard, Russell; Keane, Thomas; Louie, K. Y; McNeely, Rosa; Mordente, Patrick; Petrillo, Robert

    2006-01-01

    .... The Council of Supply Chain Management Professionals (CSCMP) has defined SCM as,"...encompassing the planning and management of all activities involved in sourcing and procurement, conversion, and all Logistics Management activities...

  18. Supply and installation of falseceiling at Academys' Fellows

    Indian Academy of Sciences (India)

    2018-01-19

    Jan 19, 2018 ... 4. The work is to be carried out without any hindrance to the ... hours by providing caution boards wherever men are working. 7. .... ascertained damages and not by way of penalty, for every day/week or part thereof beyond the ...

  19. Biofuel supply chain considering depreciation cost of installed plants

    Science.gov (United States)

    Rabbani, Masoud; Ramezankhani, Farshad; Giahi, Ramin; Farshbaf-Geranmayeh, Amir

    2016-06-01

    Due to the depletion of the fossil fuels and major concerns about the security of energy in the future to produce fuels, the importance of utilizing the renewable energies is distinguished. Nowadays there has been a growing interest for biofuels. Thus, this paper reveals a general optimization model which enables the selection of preprocessing centers for the biomass, biofuel plants, and warehouses to store the biofuels. The objective of this model is to maximize the total benefits. Costs of the model consist of setup cost of preprocessing centers, plants and warehouses, transportation costs, production costs, emission cost and the depreciation cost. At first, the deprecation cost of the centers is calculated by means of three methods. The model chooses the best depreciation method in each period by switching between them. A numerical example is presented and solved by CPLEX solver in GAMS software and finally, sensitivity analyses are accomplished.

  20. Water supply

    International Nuclear Information System (INIS)

    Peterson, F.L.

    1986-01-01

    Options and methodologies for the development of fresh water supplies on Bikini Atoll are much the same as those practiced in the rest of the Marshall Islands and for that matter, most atolls in the central Pacific Ocean Basin. That is, rainfall distribution on Bikini produces a distinct wet season, lasting from about May through November, with the remaining months being generally dry. As a result, fresh water from surface catchments tends to be plentiful during the wet season? but is usually scarce during the dry months, and alternative sources such as groundwater must be utilized during this time. On Bikini the problems of fresh water supply are somewhat more difficult than for most Marshall Island atolls because rainfall is only about half the Marshall Island's average. Tus water supply is a critical factor limiting the carrying capacity of Bikini Atoll. To address this problem BARC has undertaken a study of the Bikini Atoll water supply. Te primary objectives of this work are to determine: (1) alternatives available for fresh water supply, 2 the amounts, location and quality of available supplies and 3 optimal development methods. The study planned for one's year duration, has been underway only since the summer of 1985 and is thus not yet fully completed. However, work done to date, which is presented in this report of preliminary findings, provides a reasonably accurate picture of Bikini's fresh water supplies and the various options available for their development. The work remaining to be completed will mainly add refinements to the water supply picture presented in the sections to follow

  1. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  2. Agreement of 11 October 1989 between the International Atomic Energy Agency and the Government of India for the application of safeguards in connection with the supply of nuclear material from France

    International Nuclear Information System (INIS)

    1990-01-01

    The text of the Agreement of 11 October 1989 between the Government of India and the Agency for the application of safeguards in connection with the supply of nuclear material from France, which was approved by the Board on 20 September 1989, is reproduced in this document

  3. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  4. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  5. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  6. Distribution of Asellus aquaticus and microinvertebrates in a non-chlorinated drinking water supply system – Effects of pipe material and sedimentation

    DEFF Research Database (Denmark)

    Christensen, Sarah Christine; Nissen, Erling; Arvin, Erik

    2011-01-01

    Danish drinking water supplies based on ground water without chlorination were investigated for the presence of the water louse, Asellus aquaticus, microinvertebrates (......Danish drinking water supplies based on ground water without chlorination were investigated for the presence of the water louse, Asellus aquaticus, microinvertebrates (...

  7. The LECA installation - INB 55. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Leca base nuclear installation located in Cadarache (description, activities, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, reference earthquake and installation compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions, earthquake exceeding the design level) and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions and practices

  8. Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues (URAM-2009). Proceedings of an International Symposium

    International Nuclear Information System (INIS)

    2014-05-01

    This IAEA symposium is a third in a series which began in 2000 to discuss issues related to uranium raw materials. The symposia covered all areas of the uranium production cycle — including uranium geology, exploration, mining; milling and refining of uranium concentrates; and safety, environmental, social, training and regulatory issues — and reported on uranium supply and demand, and market scenarios. The first symposium was held in October 2000 — a time of extremely depressed market prices for uranium and of mines being closed — and primarily addressed environmental and safety issues in the uranium production cycle. By the time the second symposium was held in June 2005, the uranium market had started to improve after nearly two decades of depressed activity because of increased demand due to rising expectations for nuclear power expansion. Since then, there has been a dramatic rise in the uranium spot price, which in turn has promoted a significant increase in uranium exploration activities all over the world. The international symposium on Uranium Raw Material for the Nuclear Fuel Cycle (URAM-2009) was held at the IAEA, Vienna, 22–26 June 2009, at a time when nuclear energy was emerging as a viable alternative to meet the ever increasing demand of electricity in a sustainable manner, without degrading the environment. However, the global recession and credit crunch could impact the growth of the uranium industry. Since 2000, the identified uranium resource base has grown by more than 75%, exploration efforts have continued to increase in greenfield as well as brownfield sites, annual uranium production has risen, and the issue of social licensing and uranium stewardship has become increasingly important for public acceptance of the uranium industry. Some 210 delegates from 33 States and four international organizations participated in the symposium. In total, 120 technical papers were presented in the oral and poster sessions, and an exhibition on

  9. Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues (URAM-2009). Proceedings of an International Symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    This IAEA symposium is a third in a series which began in 2000 to discuss issues related to uranium raw materials. The symposia covered all areas of the uranium production cycle — including uranium geology, exploration, mining; milling and refining of uranium concentrates; and safety, environmental, social, training and regulatory issues — and reported on uranium supply and demand, and market scenarios. The first symposium was held in October 2000 — a time of extremely depressed market prices for uranium and of mines being closed — and primarily addressed environmental and safety issues in the uranium production cycle. By the time the second symposium was held in June 2005, the uranium market had started to improve after nearly two decades of depressed activity because of increased demand due to rising expectations for nuclear power expansion. Since then, there has been a dramatic rise in the uranium spot price, which in turn has promoted a significant increase in uranium exploration activities all over the world. The international symposium on Uranium Raw Material for the Nuclear Fuel Cycle (URAM-2009) was held at the IAEA, Vienna, 22–26 June 2009, at a time when nuclear energy was emerging as a viable alternative to meet the ever increasing demand of electricity in a sustainable manner, without degrading the environment. However, the global recession and credit crunch could impact the growth of the uranium industry. Since 2000, the identified uranium resource base has grown by more than 75%, exploration efforts have continued to increase in greenfield as well as brownfield sites, annual uranium production has risen, and the issue of social licensing and uranium stewardship has become increasingly important for public acceptance of the uranium industry. Some 210 delegates from 33 States and four international organizations participated in the symposium. In total, 120 technical papers were presented in the oral and poster sessions, and an exhibition on

  10. Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues (URAM-2009). Proceedings of an International Symposium

    International Nuclear Information System (INIS)

    2014-06-01

    This IAEA symposium is a third in a series which began in 2000 to discuss issues related to uranium raw materials. The symposia covered all areas of the uranium production cycle — including uranium geology, exploration, mining; milling and refining of uranium concentrates; and safety, environmental, social, training and regulatory issues — and reported on uranium supply and demand, and market scenarios. The first symposium was held in October 2000 — a time of extremely depressed market prices for uranium and of mines being closed — and primarily addressed environmental and safety issues in the uranium production cycle. By the time the second symposium was held in June 2005, the uranium market had started to improve after nearly two decades of depressed activity because of increased demand due to rising expectations for nuclear power expansion. Since then, there has been a dramatic rise in the uranium spot price, which in turn has promoted a significant increase in uranium exploration activities all over the world. The international symposium on Uranium Raw Material for the Nuclear Fuel Cycle (URAM-2009) was held at the IAEA, Vienna, 22–26 June 2009, at a time when nuclear energy was emerging as a viable alternative to meet the ever increasing demand of electricity in a sustainable manner, without degrading the environment. However, the global recession and credit crunch could impact the growth of the uranium industry. Since 2000, the identified uranium resource base has grown by more than 75%, exploration efforts have continued to increase in greenfield as well as brownfield sites, annual uranium production has risen, and the issue of social licensing and uranium stewardship has become increasingly important for public acceptance of the uranium industry. Some 210 delegates from 33 States and four international organizations participated in the symposium. In total, 120 technical papers were presented in the oral and poster sessions, and an exhibition on

  11. Additional safety assessment of the ATALANTE installation (INB nr 148) with respect to the accident which occurred in the Fukushima-Daiichi power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the ATALANTE base nuclear installation (site, activities, buildings, laboratories, materials, status with respect to the additional safety assessment), this document reports the identification of cliff-edge risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, margin assessment, earthquake-induced risks), flooding (different origins, alarm measures), other extreme natural events (lightning, rain falls, extreme earthquake with induced flooding), loss of electric supplies and of cooling systems (separately or combined). The next parts address the organization and means of intervention for severe accident management, and subcontracting practices

  12. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  13. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  14. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  15. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  16. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  17. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  18. The MCMF installation - INB 53. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the MCMF (fissile materials warehouse) base nuclear installation located in Cadarache (description, activities, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (reference earthquake, installation sizing and compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding like tempest, rainfalls and so on, earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions, modalities and practices

  19. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  20. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  1. Pengukuran Performansi Supply Chain Dengan Menggunakan Supply Chain Operation Reference (Scor) Berbasis Analytical Hierarchy Process (Ahp) Dan Objective Matrix (Omax)

    OpenAIRE

    Hanugrani, Nikita; Setyanto, Nasir Widha; Efranto, Remba Yanuar

    2013-01-01

    PT. Indonesian Tobacco merupakan salah satu Perusahaan rokok yang telah menerapkan konsep Supply Chain Management untuk mengatur proses aliran material. Selama berjalannya Supply Chain Management tersebut, Perusahaan belum pernah melakukan pengukuran terhadap performansi supply chain yang melibatkan semua pihak yang terkait. Metode yang digunakan untuk mengukur performansi supply chain adalah Supply Chain Operation Reference (SCOR). SCOR merupakan suatu model acuan proses untuk operasi supply...

  2. Installing Git under MacOS

    OpenAIRE

    Fitzpatrick, Benjamin

    2015-01-01

    Step by step guide to installing the version control software Git under the Macintosh Operating System MacOS X (and later). Includes a seqeunce of screenshots with hand drawn arrows ;-) These slides are part of the materials for an Introductory course on the R language and environment for statistial computing. Free and Open Source materials for this course hosted on GitHub: https://github.com/brfitzpatrick/Intro_to_R

  3. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  4. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  5. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  6. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  7. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  8. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  9. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  10. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  11. Steam turbine installations

    International Nuclear Information System (INIS)

    Bainbridge, A.

    1976-01-01

    The object of the arrangement described is to enable raising steam for driving steam turbines in a way suited to operating with liquid metals, such as Na, as heat transfer medium. A preheated water feed, in heat transfer relationship with the liquid metals, is passed through evaporator and superheater stages, and the superheated steam is supplied to the highest pressure stage of the steam turbine arrangement. Steam extracted intermediate the evaporator and superheater stages is employed to provide reheat for the lower pressure stage of the steam turbine. Only a major portion of the preheated water feed may be evaporated and this portion separated and supplied to the superheater stage. The feature of 'steam to steam' reheat avoids a second liquid metal heat transfer and hence represents a simplification. It also reduces the hazard associated with possible steam-liquid metal contact. (U.K.)

  12. Sustainable Construction Supply Chains through Synchronized Production Planning and Control in Engineer-to-Order Enterprises

    Directory of Open Access Journals (Sweden)

    Patrick Dallasega

    2017-10-01

    Full Text Available Sustainability in the supply chain is becoming more and more important for industrial enterprises in different sectors. This research article focuses on construction supply chains (CSCs in the Engineer-to-Order (ETO industry, where every product is almost unique based on specific customer needs and requirements. The development of methods and approaches for more sustainable supply chain management in construction is becoming even more important. Engineering, fabrication of parts and their installation on-site are not always well synchronized in ETO supply chains. The results of such supply chains are long lead times, inefficient material transport and high and uncontrolled levels of work-in-progress (WIP. This article describes a conceptual approach to synchronize demand on-site with supply in manufacturing using the CONstant Work In Progress (ConWIP concept from Lean Management to achieve Just-in-Time (JIT supply. As a result, sustainable supply chains in ETO enterprises, with optimizations from an economic, ecological and social point of view, can be designed. The approach has been validated in an industrial case study.

  13. Um modelo de decisão sobre a consignação de material estrangeiro em cadeias de suprimentos A decision model for the consignation of imported material in supply chains

    Directory of Open Access Journals (Sweden)

    Cristiano Morini

    2005-04-01

    Full Text Available A globalização dos negócios internacionais, o reduzido número de rotas de transporte internacional para o Brasil e a própria burocracia aduaneira pressionam as empresas industriais operando no Brasil a buscarem alternativas para reduzirem os tempos de resposta (atendimento aos seus clientes, sem prejuízos aos custos envolvidos. Nesse sentido, este trabalho propõe um modelo de decisão voltado à gestão da consignação de materiais estrangeiros em cadeias de suprimento. Para tal, a pesquisa aplicada apresenta estudos de caso. Um elemento-chave no modelo proposto é a definição do seu conjunto de variáveis de decisão. Assim, na primeira etapa de sua construção, o conjunto de variáveis, inicialmente proposto, foi testado e ajustado com base na realidade de algumas empresas importadoras que utilizam regimes aduaneiros especiais. Posteriormente, o modelo proposto foi testado em duas empresas da região de Campinas. Os dados obtidos mostraram ser viáveis a utilização do modelo em determinadas cadeias e para determinadas características de mercadorias, aproveitando-se da legislação aduaneira nacional como oportunidade de ganho de competitividade na gestão de cadeias de suprimentos com âmbito global.The globalization of international business, the paucity of international transportation routes to Brazil and the country's customs bureaucracy exert increasing pressure on manufacturers operating in Brazil to find alternatives to reduce the response time to customers without affecting costs. This article therefore presents a decision model for managing the consignation of imported materials in supply chains, whose development was based on several research methods, including the exploratory, the documental and case studies. A key factor in the proposed model is the definition of its set of decision variables. As the first step in the construction of this model, the initial set of proposed variables was tested and reviewed based on the

  14. Commercium Interruptus: Supply Chain Responses to Disaster

    National Research Council Canada - National Science Library

    Thomas, Rosalind

    2003-01-01

    ... in the processes of supply chain management. With regard to supplies, once a company knew where their, inbound materials were because of the linkages of computer systems, had a guaranteed date of delivery from an information-enabled...

  15. Strategic Supply

    Science.gov (United States)

    2006-01-01

    leaders as Sears, Limited Brands, DHL, Circuit City, Cingular, Nestle and IKEA (Manugistics, 2006). The Strategic Supply Chain Industry Study Group...inventory turns have increased. Other global customers have also reaped the benefits of the Manugistics software. IKEA , Sweden’s retail icon...turned to Manugistics after a mid-1990s ERP implementation failed to fix their forecasting problems, which gave way to fluctuating inventory levels. IKEA

  16. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  17. Supply chain management and optimization in manufacturing

    CERN Document Server

    Pirim, Harun; Yilbas, Bekir Sami

    2014-01-01

    This book introduces general supply chain terminology particularly for novice readers, state of the art supply chain management and optimization issues and problems in manufacturing. The book provides insights for making supply chain decisions, planning and scheduling through supply chain network. It introduces optimization problems, i.e. transportation of raw materials, products and location, inventory of plants, warehouses and retailers, faced throughout the supply chain network.

  18. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  19. Maintenance management of emergency power supply equipment (uninterruptible power supply) in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Nishida, Kyosuke; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

    2009-01-01

    Uninterruptible power supply systems are installed in the Tokai reprocessing plant in preparation for the emergency case that the commercial power supply is stopped by an accidental or intentional interruption in the supply of electricity. The uninterruptible power supply system particularly provides a temporary power source to the important devices for the radiation control of nuclear critical monitoring in the plant. Thus, the system is potentially important and essential for nuclear plants. The paper reports the current activities such as regular inspections, replacement of parts and system update, to maintain the function of uninterruptible power supply systems. (author)

  20. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  1. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  2. The text of the agreement of 18 September 1987 between Chile and the Agency for the application of safeguards to nuclear material supplied from the People's Republic of China

    International Nuclear Information System (INIS)

    1988-03-01

    The text of the Agreement between the Government of the Republic of Chile and the Agency for the application of safeguards to nuclear material in the form of UF 6 , enriched to 20% in the isotope U-235, supplied from the People's Republic of China for the fabrication of MTR-type fuel elements for Lo Aguirre research reactor, is reproduced. The agreement entered into force on 18 September 1987

  3. The Supply Chain System of Cassava on the Tapioca Industry

    OpenAIRE

    Hardoyo,; Safrudin, Ahmad; Komara, Ahmad

    2013-01-01

    The quantity, quality and continueity guarantee of raw material supply is a one of define factor for the succesfull of production process. To solve the problems of raw material supply on tapioca industry, it is important to develop a correct raw material supply management. That management must be accurate on quantity, quality, continuity and price. One of the developed management is supply chain managementThe purpose of this paper is to make a cassava raw material supply chain on 100 ton prod...

  4. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  5. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  6. Electrical installations of the Channel tunnel; Installations electriques du Tunnel sous la Manche

    Energy Technology Data Exchange (ETDEWEB)

    Kersabiec, G. de [Eurotunnel, Folkestone (United Kingdom)

    2002-08-01

    Like an underground factory, the railway and auxiliary equipments of the Channel tunnel between France and UK, need a reliable and redundant power supply with a high quality maintenance. This article presents: the design criteria of the power distribution systems, the installation itself and the organisation of its exploitation: 1 - transportation system of the Channel tunnel (loads to supply, exploitation imperatives, fundamental criteria); 2 - external power sources (connection to the UK and French grids, values used by the national grids); 3 - exploitation criteria, tunnel design; 4 - description (main UK and French power stations, 25 kV traction network, 21 kV distribution network, tunnels, lighting in railway tunnels, supply of terminals, earthing network); 5 - exploitation; 6 - maintenance and quality. (J.S.)

  7. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  8. The text of the agreement of 8 July 1982 between Argentina and the Agency for the application of Safeguards in connection with the supply of nuclear material from the Union of Soviet Socialist Republics

    International Nuclear Information System (INIS)

    1995-01-01

    The Agreement between the Republic of Argentina, the Federative Republic of Brazil, the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials and the International Atomic Energy Agency for the Application of Safeguards came into force on 4 March 1994. As a result of the coming into force of the aforesaid Agreement for Argentina, the application of safeguards under the Agreement of 8 July 1982 between Argentina and the IAEA for the application of safeguards in connection with the supply of nuclear material from the Union of Soviet Socialist Republics has been suspended

  9. Installation for rewetting experiments

    International Nuclear Information System (INIS)

    Rezende, H.C.; Ladeira, L.C.D.

    1986-03-01

    A test facility for rewetting experiments (ITR), has been erected at the Thermalhydraulics Laboratory of Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), with the objective of performing investigation of basic phenomena that occur during the reflood phase of a Loss of Coolant Accident (LOCA), in a Pressurized Water Reactor (PWR), utilizing tubular and annular test sections. The mechanical aspects of the facility, its power supply system and its instrumentation are described. The results of the calibration of the instruments and the description of two typical testes performed to verify the operational conditions are presented. A comparison with calculations using a computer code is also presented. (Author) [pt

  10. Developing sustainable food supply chains.

    Science.gov (United States)

    Smith, B Gail

    2008-02-27

    This paper reviews the opportunities available for food businesses to encourage consumers to eat healthier and more nutritious diets, to invest in more sustainable manufacturing and distribution systems and to develop procurement systems based on more sustainable forms of agriculture. The important factors in developing more sustainable supply chains are identified as the type of supply chain involved and the individual business attitude to extending responsibility for product quality into social and environmental performance within their own supply chains. Interpersonal trust and working to standards are both important to build more sustainable local and many conserved food supply chains, but inadequate to transform mainstream agriculture and raw material supplies to the manufactured and commodity food markets. Cooperation among food manufacturers, retailers, NGOs, governmental and farmers' organizations is vital in order to raise standards for some supply chains and to enable farmers to adopt more sustainable agricultural practices.

  11. Materialism.

    Science.gov (United States)

    Melnyk, Andrew

    2012-05-01

    Materialism is nearly universally assumed by cognitive scientists. Intuitively, materialism says that a person's mental states are nothing over and above his or her material states, while dualism denies this. Philosophers have introduced concepts (e.g., realization and supervenience) to assist in formulating the theses of materialism and dualism with more precision, and distinguished among importantly different versions of each view (e.g., eliminative materialism, substance dualism, and emergentism). They have also clarified the logic of arguments that use empirical findings to support materialism. Finally, they have devised various objections to materialism, objections that therefore serve also as arguments for dualism. These objections typically center around two features of mental states that materialism has had trouble in accommodating. The first feature is intentionality, the property of representing, or being about, objects, properties, and states of affairs external to the mental states. The second feature is phenomenal consciousness, the property possessed by many mental states of there being something it is like for the subject of the mental state to be in that mental state. WIREs Cogn Sci 2012, 3:281-292. doi: 10.1002/wcs.1174 For further resources related to this article, please visit the WIREs website. Copyright © 2012 John Wiley & Sons, Ltd.

  12. PFP supply fan motor starters

    International Nuclear Information System (INIS)

    Keck, R.D.

    1995-01-01

    The Plutonium Finishing Plant (PFP) is currently stabilizing about 25 kg of Pu sludge; upon completion of this task, PFP will be maintained in a safe standby condition to await decision from the PFP NEPA review. It can take about 10 years to initiate and complete terminal cleanout after this; the facility will then be decommissioned and decontaminated. The 234-5Z ventilation system must continue to operate until terminal cleanout. Part of the ventilation system is the seismic fan shutdown system which shuts down the ventilation supply fans in case of strong earthquake. This document presents criteria for installing solid state, reduced voltage motor starters and isolation contactors for the 8 main ventilation supply fans. The isolation contactors will shutdown the supply fans in event of earthquake

  13. 47 CFR 80.268 - Technical requirements for radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... a visual indication whenever the transmitter is supplying power to the antenna. (4) Have a two-tone... between masts or other supports subject to whipping, a safety link must be installed which under heavy stress will reduce breakage of the antenna, the halyards, or any other supporting elements. (d) The...

  14. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  15. Firewood supply

    International Nuclear Information System (INIS)

    Kaufmann, G.

    1992-01-01

    The use of wood shavings as a heating material in Switzerland is promoted. The processing possibilities of wood used for this purpose and its efficiency are discussed. Concrete proposals are put forward. figs., refs., 23 tabs

  16. Which place for nuclear power? The cost of power supplies security. The tariffs of power networks use. Towards a new regime of natural gas transportation in France. The mastery of raw materials supplies. The behaviour of the estate park of the collieries of the Nord-Pas-de-Calais basin

    International Nuclear Information System (INIS)

    Mattatia, St.; Bonnet, J.Ph.; Singly, B. de; Philippe, R.; Thouvenin, V.; Clain, Y.; Dalnoky, M.

    2002-01-01

    This issue of 'Energies et Matieres Premieres' quarterly newsletter comprises 6 articles dealing with: the share of nuclear power in the future world and French energy status (environmental and economical aspects, service life of nuclear power plants and coming up renewal, uncertainties); the cost of the security of power supplies (the improvement of power networks after the 1999 storms, the burial of power lines); how to charge for the uncatchable: the tariffs of use of power networks (the uncatchable notion of electricity transport, the first proposals of the French commission of electric power regulation (CRE), the general principles of tariffing and their practical implementation); towards a new regime of natural gas transportation in France (a legal regime that became singular inside the European Union, a careful financial evaluation of concessions, the new regime of transport permission); the mastery of raw materials supplies: a giant world scale 'Go' game (the Chinese control of the tungsten file, the titanium market, the policy of security of supplies for the sensible raw materials); the behaviour of the estate park of the old collieries of Nord-Pas de Calais region (northern France) belonging to the national group 'Charbonnages de France' (context and implementation of the transfer). The status of the evolution of the French energy consumption and bill since January 2000 is presented in a series of graphics at the end of this issue. (J.S.)

  17. Integrated decision making for the optimal bioethanol supply chain

    International Nuclear Information System (INIS)

    Corsano, Gabriela; Fumero, Yanina; Montagna, Jorge M.

    2014-01-01

    Highlights: • Optimal allocation, design and production planning of integrated ethanol plants is considered. • Mixed Integer Programming model is presented for solving the integration problem. • Different tradeoffs can be assessed and analyzed. • The modeling framework represents an useful tool for guiding decision making. - Abstract: Bioethanol production poses different challenges that require an integrated approach. Usually previous works have focused on specific perspectives of the global problem. On the contrary, bioethanol, in particular, and biofuels, in general, requires an integrated decision making framework that takes into account the needs and concerns of the different members involved in its supply chain. In this work, a Mixed Integer Linear Programming (MILP) model for the optimal allocation, design and production planning of integrated ethanol/yeast plants is considered. The proposed formulation addresses the relations between different aspects of the bioethanol supply chain and provides an efficient tool to assess the global operation of the supply chain taking into account different points of view. The model proposed in this work simultaneously determines the structure of a three-echelon supply chain (raw material sites, production facilities and customer zones), the design of each installed plant and operational considerations through production campaigns. Yeast production is considered in order to reduce the negative environmental impact caused by bioethanol residues. Several cases are presented in order to assess the approach capabilities and to evaluate the tradeoffs among all the decisions

  18. PLT neutral injection ignitron accelerating supply

    International Nuclear Information System (INIS)

    Ashcroft, D.L.; Murray, J.G.; Newman, R.A.; Peterson, F.L.

    1975-11-01

    A phase-controlled rectifier was designed for the accelerating supply on the PLT Neutral Beam Injection system at PPPL. The rectifier must furnish 70 amperes at up to 50 KV for 300 milliseconds, with a duty cycle of up to 10 percent. Protection of the injectors requires the supply to withstand repeated crowbarring. The rectifying element selected to satisfy these requirements was a commercially-available ignitron, installed in a supporting frame and using firing circuits and controls designed by PPPL

  19. PLT neutral injection ignitron accelerating supply

    International Nuclear Information System (INIS)

    Ashcroft, D.L.; Murray, J.G.; Newman, R.A.; Peterson, F.L.

    1976-03-01

    A phase-controlled rectifier has been designed for the accelerating supply on the PLT Neutral Beam Injection system at PPPL. The rectifier must furnish 70 amperes at up to 50 KV for 300 milliseconds, with a duty cycle of up to 10 percent. Protection of the injectors requires the supply to withstand repeated crowbarring. The rectifying element selected to satisfy these requirements was a commercially-available ignitron, installed in a supporting frame and using firing circuits and controls designed by PPPL

  20. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  1. Installation of a generator. Status as of May 15 1988

    International Nuclear Information System (INIS)

    Heugel, J.

    1988-05-01

    The status of the generator installation for the project Vivitron as of May 1988 is shown. The list of ordered materials and the balance-sheet of the done work are given. Work to be done is indicated [fr

  2. Auto component supply chain: a path to global India

    OpenAIRE

    Kale, Shailendra; Palacios Fernández, Miguel; Tafur Segura, José Javier; Jarad, Rajendra; Chitale, C.M.

    2011-01-01

    Supply chain management works to bring the supplier, the distributor, and the customer into one cohesive process. The Supply Chain Council defined supply chain as ‘Supply Chain: The flow and transformation of raw materials into products from suppliers through production and distribution facilities to the ultimate consumer., and then Sunil Chopra and Meindl, (2001) have define Supply chain management as ‘Supply Chain Management involves the flows between and among stages in a supply chain to m...

  3. Logistical Support for the Installation of the Plate Boundary Observatory GPS and Borehole Strainmeter Networks

    Science.gov (United States)

    Kurnik, C.; Austin, K.; Coyle, B.; Dittmann, T.; Feaux, K.; Friesen, B.; Johnson, W.; Mencin, D.; Pauk, B.; Walls, C.

    2007-12-01

    The Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project, is designed to study the three- dimensional strain field resulting from deformation across the active boundary zone between the Pacific and North American plates in the western United States. To meet these goals, UNAVCO will install 880 continuous GPS stations, 103 borehole strainmeter stations, 28 tiltmeters, and five laser strainmeters by October 2008. Such a broad network presents significant logisitical challenges, including moving supplies, equipment, and personnel around 6 million square kilometers, and this requires accurate tracking and careful planning. The PBO logistics chain includes the PBO headquarters at UNAVCO in Boulder, Colorado and five regional offices in the continental United States and Alaska, served by dozens of suppliers spread across the globe. These offices are responsible for building and maintaining sites in their region. Most equipment and supplies first arrive in Boulder, where they are tagged and entered into a UNAVCO-wide equipment database, assembled and quality checked as necessary, and sent on to the appropriate regional office. Larger items which are costly to store and ship from Boulder, such as batteries or long sections of stainless steel pipe and bar required for monuments, are shipped directly from the supplier to each region as needed. These supplies and equipment are also tracked through the ordering, delivery, installation, and maintenance cycle via Earned Value Management techniques which allow us to meet NSF and other Federal procurement rules. Early prototypes and assembly configurations aid the development of material and supply budgets. A thorough understanding of Federal procurement rules at project start up is critical as the project moves forward.

  4. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  5. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  6. The Pegase installation - INB 22. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Pegase base nuclear installation located in Cadarache (description and functions, radioactive and chemical materials, specific risks, present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing and compliance, margin assessment), external flooding (installation sizing and compliance, margin assessment in relationship with the different flooding origins), other extreme natural events (hail, extreme rainfalls, strong winds, lightning, and earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (means and organization for crisis management, robustness of available means), and subcontracting conditions and practices

  7. The Rapsodie installation - INB 25. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Rapsodie base nuclear installation located in Cadarache (brief description of buildings, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (reference earthquake, installation sizing and compliance issues, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding, earthquake exceeding the design level), and loss of external or internal electric supplies and of cooling systems. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions, modalities and practices

  8. The CHICADE installation - INB 156. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Chicade base nuclear installation located in Cadarache (brief description, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing and compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding like tempest, rainfalls and so on, earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions and practices

  9. Materials

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2009-02-01

    Full Text Available . It is generally included as part of a structurally insulated panel (SIP) where the foam is sandwiched between external skins of steel, wood or cement. Cement composites Cement bonded composites are an important class of building materials. These products... for their stone buildings, including the Egyptians, Aztecs and Inca’s. As stone is a very dense material it requires intensive heating to become warm. Rocks were generally stacked dry but mud, and later cement, can be used as a mortar to hold the rocks...

  10. Berlin Brandenburg International (BER: planning and implementation of a concrete supply chain for the airport construction site

    Directory of Open Access Journals (Sweden)

    Guido Riedel

    2012-12-01

    Full Text Available Background: With the decision to extend the airport Berlin-Schönefeld to the new airport Berlin Brandenburg International (BER in 2006, a construction of superlatives has emerged. One of the biggest challenges was the supply of around 2.5 million cubic meters of high quality concrete that had to be produced for the construction of the airport. Due to the scale of this enterprise as well as its environment, the logistic solution of raw material supply has to be found.       Method: The planning of the concrete supply chain for the airport construction site BER had to be carried out with two major goals: the stability of the supply chain to assure that the demands of the construction site are met and delays are prevented, as well as assurance of the high quality standards of the concrete production and to avoid an alkali silica reaction and the resulting unavoidable disaggregation of the concrete. External effects, such as the carbon dioxide emission and the effect of the supply chain on adjoining residents were key factors that had to be integrated in a holistic supply chain concept.  The principle underlying method is an analysis of limiting conditions for two approaches: a centralized supply chain with on-site concrete factory and upstream transport of raw materials versus a decentralized supply chain with off-site factories and downstream transport of ready-mixed concrete. Results: The analysis of constraints and the effects on key requirements of the concrete supply chain for the BER airport construction site lead to the installation of the most modern concrete plant in Europe. The benefits of a centralized supply chain are significant. On one hand, the high quality standards can be met with the on-site mixture of the concrete and centralized quality assurance, on the other hand, the majority of the supply traffic for the construction site was moved from the road to train-bound logistics, meeting the emission requirements of the

  11. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  12. Parâmetros de produtividade de um centro de material e esterilização Los parametros de productividad del centro de material y esterilización Productivity indicators in a sterilization central supply

    Directory of Open Access Journals (Sweden)

    Tânia Regina Sancinetti

    2007-06-01

    Full Text Available O estudo identifica parâmetros de produtividade no Centro de Material e Esterilização, com base em documentos, observação e cronometragem do processamento de duas amostras: caixa de herniorrafia e pacote de curativo. A produção média mensal foi de 30.466,42 artigos, a capacidade de produção, por hora, foi de 10,3 artigos por funcionário. O tempo de processamento do curativo do expurgo ao armazenamento foi, em média, de 295 minutos; o processo manual utilizou 46 minutos e o automatizado, 88 minutos. O tempo da caixa de herniorrafia foi de 329 minutos; o processo manual utilizou 60 minutos e o automatizado, 98 minutos. O processamento manual do curativo utilizou 59,23% horas produtivas no expurgo; 26,31% guarda e distribuição; 10,94% esterilização e 3,28% preparo. Quanto à caixa de herniorrafia: no preparo 16,20%; no expurgo 11,84%; na guarda e distribuição 7,47% e na esterilização 1,89%. Este estudo possibilitou aferir resultados e analisar o processo de trabalho no CME.El estudio identifica parámetros de productividad del Centro de Material y Esterilización, basados en documentos, observación y cronometraje procesadas en dos muestras: caja de herniorafia y fardo de curativo. El promedio de producción mensual fue de 30.466,42 artículos y el promedio de la capacidad de producción por hora fue 10,3 artículos por empleado. El tiempo de procesamiento del curativo del expurgo al almacenamiento fue en un promedio de 295 minutos; su proceso manual utilizó 46 minutos y lo automatizó en 88 minutos. El tiempo de la caja de herniorafia fue 329 minutos; su proceso manual utilizó 60 minutos y lo automatizó en 98 minutos. El procesamiento manual del curativo fue: 59,23% horas productivas encima del expurgo; 26,31% guarda y distribución; 10,94% esterilización y 3,28% preparo. Cuanto a la caja de herniorafia: en su preparo 16,20%; en el expurgo 11,84%; en la custodia y asignación 7,47% y en la esterilización 1,89%. El estudio

  13. NGLs supply

    International Nuclear Information System (INIS)

    Richardson, I.

    1999-01-01

    This presentation dealt with the supply of natural gas liquids (NGLs) as a prelude to a review of the Alliance pipeline project. With all approvals having been received both in Canada and the United States, and complete financing secured, construction of the line will commence in the spring of 1999, with operation scheduled to begin Oct. 1, 2000. U.S. midwest and Alberta field gas prices, natural gas production in Alberta and British Columbia, current Alberta gas exports, the Aux Sable's NGL markets, market access for Western Canadian NGLs, historical disposition of Alberta ethane, propane and butyl ethane availability in Alberta, and historical and forecast NGL recovery in Alberta and British Columbia with and without the Alliance pipeline were reviewed. It was concluded that additional natural gas pipeline capacity is necessary to stimulate industry activity and monetize Western Canada Sedimentary Basin reserves. In turn, increased natural gas production will stimulate NGL exports. The Alliance Pipeline will provide additional NGL export capacity and potentially increase producer netbacks while minimizing capital expenditures. . 14 figs

  14. Photoelectric installations in Tunisia

    Energy Technology Data Exchange (ETDEWEB)

    Darkazalli, G

    1983-01-01

    Four autonomous photoelectric power plants (FEU) have been in operation since February, 1983 in the village of Hamman Biadha. One of them based on a solar battery (SB) with a capacity of 29 kilowatts made of modules by the Solar Power Corporation (U.S.A.), has a storage battery (AB) with a capacity of 360 kilowatts per hour, and serves to supply alternating current, 220 volt voltage electric power to stores, a mill, a hospital, a school and streetlights near them and 22 houses. The solar battery is maintained in a maximal power mode which increases the energy production by 5 to 10 percent. As the charge of the storage battery is reduced below the assigned levels, the appropriate consumers are shut off. The daily energy productivity of the photoelectric power plant is 119 kilowatt hours per day in July and 65 kilowatt hours per day in December. A smaller variant of this photoelectric power plant with a capacity of 1.5 kilowatts provides electric power to a farm. The other two photoelectric power plants drive the irrigation systems for a greenhouse with an area of 10exp4 square meters and a fruit garden. The maximum productivity of each of them is 750 cubic meters per month with a delivery of 17 meters.

  15. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  16. Environmental Retail Supply Chains

    DEFF Research Database (Denmark)

    Kotzab, Herbert; Munch, Hilde; de Faultrier, Birgitte

    2011-01-01

    which were grouped into eight categories; they refer to “fundamental environmental attitude”, “use of energy”, “use of input material”, “product”, “packaging”, “transport”, “consumption” and “waste”. The level of environmental supply chain management can be characterised as very operational and very...... short-term oriented (green operations). Long-term oriented green design initiatives were hardly observed. Furthermore, the specific environmental activities of three retailers from Denmark, France and the UK were compared. Research limitations/implications – The empirical study investigates supply chain...... operations of retailers and excludes other areas of retail management. The results are based on material that is published by the respective companies and thus do not include internal reports. Originality/value – The main contribution of this paper is to test the proposition that global retailers follow...

  17. Perspectives of energy supply. Possibilities for restructuring the energy supply of Baden-Wuerttemberg with special regard to power supply. Materials volume 9. Economic and ecological aspects of energy consumption. Perspektiven der Energieversorgung. Moeglichkeiten der Umstrukturierung der Energieversorgung Baden-Wuerttembergs unter besonderer Beruecksichtigung der Stromversorgung. Materialienband 9. Wirtschaftliche und oekologische Aspekte der Energienutzung

    Energy Technology Data Exchange (ETDEWEB)

    Voss, A; Fiedler, F; Luhmann, H J

    1987-01-01

    The accident of Chernobyl certainly is a good reason to make once more a critical and very thorough review of the part nuclear energy will play in future in the supply of energy. The government of the Land Baden-Wuerttemberg commissioned an expert opinion in the summer of 1986 with the following intentions: To make a comprehensive analysis of ways technically feasible to safeguard the energy supply of Baden-Wuerttemberg in the long term, evaluate these as to their ecological, economic, and social repercussions, and to investigate in particular whether, to what extent and by what steps nuclear energy use can be made superfluous and what consequences this will entail. Building on the current state of knowledge, the expert opinion is to provide the basic data for weighing the benefits and risks of different technically feasible forms that the energy supply of Baden-Wuerttemberg may take in future. This publication presents the results of more than a year's intensive research work. This volume contains the complete scientific data of the sub-project 'Scenario of Energy Consumption and Energy Supply in Baden-Wuerttemberg'. The summarizing final report indicates the position of this sub-project within the overall problem.

  18. Status quo of supply technology

    Energy Technology Data Exchange (ETDEWEB)

    Noda, Shigeo

    1987-09-01

    Problems for gas supply function, activity of the Gas Association, and technological development mainly of the presented subjects are reported. According to the materials released by the Gas Associattion, demands for city gas by the 21st Century is expected to be rather high with 3.6% annual growth rate. It is premissed on an assumption that the superior quality of the city gas satisfying customer requirements would be further upgraded. The problems confronted by the supply function for this purpose are the pursuit for less cost, improvement in security, and stable gas supply. The Gas Association carried out research, investigation, preparation of standards, etc., and published instructive materials such as guide for main and branch piping, guide for supply piping, technical standards for gas related works, etc. It also has been endeavoring to popularize the use of polyethylene pipies, and studying the evaluation method for the renewal and repair of gas conduits and house regulator supply system, etc. The supply function has been working on the cutting dowm of costs, inprovement in security, and developing technologies such as underground probing radar, inteligent pipe locator, identifier for gas and water supply tubes, estimation of ground subsidence, inspection of inside of pipes by a television camera, etc. (1 tab)

  19. Distribution of Asellus aquaticus and microinvertebrates in a non-chlorinated drinking water supply system--effects of pipe material and sedimentation.

    Science.gov (United States)

    Christensen, Sarah C B; Nissen, Erling; Arvin, Erik; Albrechtsen, Hans-Jørgen

    2011-05-01

    Danish drinking water supplies based on ground water without chlorination were investigated for the presence of the water louse, Asellus aquaticus, microinvertebrates (tanks (6000 and 36,000 m(3)) as well as one clean water tank at a waterworks (700 m(3)) were inspected. Several types of invertebrates from the phyla: arthropoda, annelida (worms), plathyhelminthes (flatworms) and mollusca (snails) were found. Invertebrates were found at 94% of the sampling sites in the piped system with A. aquaticus present at 55% of the sampling sites. Populations of A. aquaticus were present in the two investigated elevated tanks but not in the clean water tank at a waterworks. Both adult and juvenile A. aquaticus (length of 2-10 mm) were found in tanks as well as in pipes. A. aquaticus was found only in samples collected from two of seven investigated distribution zones (zone 1 and 2), each supplied directly by one of the two investigated elevated tanks containing A. aquaticus. Microinvertebrates were distributed throughout all zones. The distribution pattern of A. aquaticus had not changed considerably over 20 years when compared to data from samples collected in 1988-89. Centrifugal pumps have separated the distribution zones during the whole period and may have functioned as physical barriers in the distribution systems, preventing large invertebrates such as A. aquaticus to pass alive. Another factor characterising zone 1 and 2 was the presence of cast iron pipes. The frequency of A. aquaticus was significantly higher in cast iron pipes than in plastic pipes. A. aquaticus caught from plastic pipes were mainly single living specimens or dead specimens, which may have been transported passively trough by the water flow, while cast iron pipes provided an environment suitable for relatively large populations of A. aquaticus. Sediment volume for each sample was measured and our study described for the first time a clear connection between sediment volume and living A. aquaticus

  20. CHALLENGES OF SUPPLY CHAIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Natalia GALANTON

    2017-11-01

    Full Text Available The present article highlights the basic characteristics of the supply chain, specific to changes in the business environment of companies at the beginning of the 21st century. Supply chain activities turn natural resources, raw materials and components into a finished product, which is then delivered to the final customer. The supply chain incorporates the production process alongside the raw material acquisition and distribution of finished products, encompassing all the existing process responsible for transforming the materials taken from the supplier to the finished products delivered to customers. Today, competitiveness and performance of an organization are dependent on belonging to an efficient and effective supply-delivery chain where synergies exist due to the establishment and implementation of common goals and strategies by partners. Competition does not take place between independent organizations or between small groups of organizations, but between supply and delivery chains, made up of interconnected networks of producers, distributors and logistics providers. Under these circumstances, supply chain managers must seek solutions to respond promptly to the most important challenges in the field.

  1. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  2. New intelligent magnet power supplies for LAMPF

    International Nuclear Information System (INIS)

    Cohen, S.; Sturrock, J.

    1991-01-01

    New magnet power supplies are scheduled to be installed in the proton linac at the Clinton P. Anderson Meson Physics Facility (LAMPF). The control and interface design of these power supplies represents a departure from all others onsite. A high-level ASCII control protocol has been designed. The supplies have sophisticated microprocessor control onboard and communicate with the accelerator control system via RS-422 (serial communications). The low-level software used by the accelerator control system is currently being rewritten to accommodate these new devices. They will communicate with the control system through a terminal server port connected to the site-wide ethernet backbone. This means that each supply will, for all intents and purposes, be a network object. Details of the design strategies for the analog and digital control for these supplies as well as the control protocol interface will be presented. 5 refs., 5 figs., 1 tab

  3. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  4. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  5. Installation for low temperature vapor explosion experiment

    International Nuclear Information System (INIS)

    Nilsuwankosit, Sunchai; Archakositt, Urith

    2000-01-01

    A preparation for the experiment on the low temperature vapor explosion was planned at the department of Nuclear Technology, Chulalongkorn University, Thailand. The objective of the experiment was to simulate the interaction between the molten fuel and the volatile cooling liquid without resorting to the high temperature. The experiment was expected to involve the injection of the liquid material at a moderate temperature into the liquid material with the very low boiling temperature in order to observe the level of the pressurization as a function of the temperatures and masses of the applied materials. For this purpose, the liquid nitrogen and the water were chosen as the coolant and the injected material for this experiment. Due to the size of the installation and the scale of the interaction, only lumped effect of various parameters on the explosion was expected from the experiment at this initial stage. (author)

  6. Electricity supply

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-10-01

    This report focuses on the Securities and Exchange Commission's (SEC) administration of the Public Utility Holding Company Act of 1935, intended to protect the public, investors, and consumers from abuses associated with the control of electric and gas utility companies through the holding company structure. These abuses include subjecting subsidiary utilities to excessive charges for services, construction work, and materials; frustrating effective state regulation through the holding company structure; and overloading subsidiary utilities with debt to prevent voluntary rate reductions. GAO discusses industry changes during the past decade involving electric utility holding companies; SEC's regulatory response to such changes; and the relationship between SEC, the Federal Energy Regulatory Commission, and states in protecting consumer and investor interests in light of these changes

  7. Optimum design of a nuclear heat supply

    International Nuclear Information System (INIS)

    Borel, J.P.

    1984-01-01

    This paper presents an economic analysis for the optimum design of a nuclear heat supply to a given district-heating network. First, a general description of the system is given, which includes a nuclear power plant, a heating power plant and a district-heating network. The heating power plant is fed with steam from the nuclear power plant. It is assumed that the heating network is already in operation and that the nuclear power plant was previously designed to supply electricity. Second, a technical definition of the heat production and transportation installations is given. The optimal power of these installations is examined. The main result is a relationship between the network capacity and the level of the nuclear heat supply as a substitute for oil under the best economic conditions. The analysis also presents information for choosing the best operating mode. Finally, the heating power plant is studied in more detail from the energy, technical and economic aspects. (author)

  8. Perspectives of energy supply. Possibilities for restructuring the energy supply of Baden-Wuerttemberg with special regard to power supply. Materials volume 6. Nuclear power. Pt. 2. Perspektiven der Energieversorgung. Moeglichkeiten der Umstrukturierung der Energieversorgung Baden-Wuerttembergs unter besonderer Beruecksichtigung der Stromversorgung. Materialienband 6. Kernenergie. T. 2

    Energy Technology Data Exchange (ETDEWEB)

    Voss, A; Schatz, A; Herold, H

    1987-01-01

    The accident of Chernobyl certainly is a good reason to make once more a critical and very thorough review of the part nuclear energy will play in future in the supply of energy. The government of the Land Baden-Wuerttemberg commissioned an expert opinion in the summer of 1986 with the following intentions: To make a comprehensive analysis of ways technically feasible to safeguard the energy supply of Baden-Wuerttemberg in the long term, evaluate these as to their ecological, economic, and social repercussions, and to investigate in particular whether, to what extent and by what steps nuclear energy use can be made superfluous and what consequences this will entail. Building on the current state of knowledge, the expert opinion is to provide the basic data for weighing the benefits and risks of different technically feasible forms that the energy supply of Baden-Wuerttemberg may take in future. This publication presents the results of more than a year's intensive research work. This volume contains the complete scientific data of the sub-project 'Nuclear Power'. The summarizing final report indicates the position of this sub-project within the overall problem.

  9. Development and optimization of an advanced process for non-dig installation of pipelines transporting energy and raw materials; Entwicklung und Optimierung eines neuen Verfahrens zur grabenlosen Verlegung von Rohrleitungen fuer den Energie- und Rohstofftransport

    Energy Technology Data Exchange (ETDEWEB)

    Koegler, Ruediger

    2008-04-07

    Controllable horizontal drilling is a method established worldwide for laying pipelines under natural or artificial obstacles without trenches. In 2002 an 18'' gas pipeline was laid under the river Rhone under the most difficult topographical and geological conditions for the French energy supplier Gaz de France by means of horizontal drilling technology. In this thesis the Easy pipe procedure has been developed derived from MT (Mircrotunneling) engineering. The procedure is stepwise as a pilot process introduced and furtheron developed and installed for pipeline laying. (orig./GL)

  10. 47 CFR 80.917 - Reserve power supply.

    Science.gov (United States)

    2010-10-01

    ... power supply must be adequately treated to prevent freezing or overheating consistent with the season... 47 Telecommunication 5 2010-10-01 2010-10-01 false Reserve power supply. 80.917 Section 80.917... MARITIME SERVICES Compulsory Radiotelephone Installations for Small Passenger Boats § 80.917 Reserve power...

  11. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  12. Governance In Project Configured Supply Chains

    DEFF Research Database (Denmark)

    Koch, Christian; Larsen, Casper Schultz; Gottlieb, Stefan Christoffer

    2006-01-01

    are integrated knowledge, material, workforce and management subsystem deliveries (the building core produced of pre-cast concrete, the elevator supply and the kitchen supply). Further 17 deliveries draws on more than 50 materials and component suppliers. The case project generated 160 failures over three months......This case study covers a Danish architectural, engineering and construction supply network for a specific building project. Failures in supply are used as indicators of the governance forms employed. The following governance forms are present; internal integration and hierarchy, SCM......-efforts, subsystem deliveries and contracting per project. The case exhibits a very uneven integration upstream: Three engineering design areas are integrated with production and the client function. Amongst supplies, the architectural design is the most 'clean-cut' knowledge supply, whereas the supplies...

  13. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  14. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  15. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  16. International Symposium on Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues. Presentations

    International Nuclear Information System (INIS)

    2014-01-01

    The long term sustainability of nuclear power will depend on, among several factors, an adequate supply of uranium resources that can be delivered to the marketplace at competitive prices. New exploration technologies and a better understanding of the genesis of uranium ores will be required to discover often deep-seated and increasingly hard to find uranium deposits. Exploration, mining and milling technologies should be environmentally benign, and site decommissioning plans should meet the requirements of increasingly stringent environmental regulations and societal expectations. The purpose of this symposium is to analyse uranium supply–demand scenarios and to present and discuss new developments in uranium geology, exploration, mining and processing, as well as in environmental requirements for uranium operations and site decommissioning. The presentations and discussions at URAM-2014 will: - Lead to a better understanding of the adequacy of uranium sources (both primary and secondary) to meet future demand; - Provide information on geological models, new exploration concepts, knowledge and technologies that will potentially lead to the discovery and development of new uranium resources; - Describe new production technologies that have the potential to more efficiently and sustainably develop new uranium resources; and - Document the environmental compatibility of uranium production and the overall effectiveness of progressive final decommissioning and, where required, remediation of production facilities.

  17. International Symposium on Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues. Book of Abstracts

    International Nuclear Information System (INIS)

    2014-01-01

    The long term sustainability of nuclear power will depend on, among several factors, an adequate supply of uranium resources that can be delivered to the marketplace at competitive prices. New exploration technologies and a better understanding of the genesis of uranium ores will be required to discover often deep-seated and increasingly hard to find uranium deposits. Exploration, mining and milling technologies should be environmentally benign, and site decommissioning plans should meet the requirements of increasingly stringent environmental regulations and societal expectations. The purpose of this symposium is to analyse uranium supply–demand scenarios and to present and discuss new developments in uranium geology, exploration, mining and processing, as well as in environmental requirements for uranium operations and site decommissioning. The presentations and discussions at URAM-2014 will: - Lead to a better understanding of the adequacy of uranium sources (both primary and secondary) to meet future demand; - Provide information on geological models, new exploration concepts, knowledge and technologies that will potentially lead to the discovery and development of new uranium resources; - Describe new production technologies that have the potential to more efficiently and sustainably develop new uranium resources; and - Document the environmental compatibility of uranium production and the overall effectiveness of progressive final decommissioning and, where required, remediation of production facilities.

  18. Co-combustion of cultivable raw materials in existing power supply plants -a study on the potential for such plants in the eastern Laender. Final report

    International Nuclear Information System (INIS)

    Grosskopf, W.; Kappelmann, K.H.

    1996-04-01

    The present study is dedicated to an analysis of co-combustion of biomass in existing power supply plants in the eastern Laender. The question to be resolved is whether the existing substantial potential for substituting fossil energy carriers for biomass in the short term and at low cost also offers a viable option from the viewpoint of political economy. In its final assessment the study also takes agropolitical and ecopolitical interests into account. A further basic question posed by this impact analysis is in what way the increased use of biomass as an energy carrier can contribute to farmers; income and thus help improve employment in rural area. Implicated in this is the question whether the conservation of developed land resulting from large-area biomass cultivation is desirable from the sociopolitical viewpoint. Another important aspect concerning the impact analysis is the question as to the environmental efficiency of biomass co-combustion given the Federal Government's aims regarding CO 2 abatement. The study examines how biomas co-combustion compares with other alternatives to this end in terms of CO 2 abatement costs. These deliberations provide the basis for the study's concluding recommendations to political decision makers who are confronted with the question whether and under what conditions public promotion of biomass co-combustion in the new Laender makes sociopolitical sense. (orig./SR) [de

  19. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  20. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  1. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  2. J.O. no. 10 of the 13 january 2004, page 991, text no. 14. Decrees, orders. General texts. Decree no. 2004-47 of the 12 january 2004 modifying the decree no. 96-978 of the 31 october 1996 relative to the creation of the nuclear installation no. 162 named EL4-D, installation of storage for the Monts d'Arree power plants materials

    International Nuclear Information System (INIS)

    2004-06-01

    The reactor EL4, implemented in december 1966, has definitely shutdown on the 31 july 1985. This reactor was an industrial prototype, built and exploited by Cea and EDF. In the framework of the partial dismantling of the installation, the decree 96-978 of the 31 october 1996 agreed the Cea to modify the installation to become a storage installation. (A.L.B.)

  3. Byproduct metals and rare-earth elements used in the production of light-emitting diodes—Overview of principal sources of supply and material requirements for selected markets

    Science.gov (United States)

    Wilburn, David R.

    2012-01-01

    The use of light-emitting diodes (LEDs) is expanding because of environmental issues and the efficiency and cost savings achieved compared with use of traditional incandescent lighting. The longer life and reduced power consumption of some LEDs have led to annual energy savings, reduced maintenance costs, and lower emissions of carbon dioxide, sulfur dioxide, and nitrogen oxides from powerplants because of the resulting decrease in energy consumption required for lighting applications when LEDs are used to replace less-energy-efficient sources. Metals such as arsenic, gallium, indium, and the rare-earth elements (REEs) cerium, europium, gadolinium, lanthanum, terbium, and yttrium are important mineral materials used in LED semiconductor technology. Most of the world's supply of these materials is produced as byproducts from the production of aluminum, copper, lead, and zinc. Most of the rare earths required for LED production in 2011 came from China, and most LED production facilities were located in Asia. The LED manufacturing process is complex and is undergoing much change with the growth of the industry and the changes in demand patterns of associated commodities. In many respects, the continued growth of the LED industry, particularly in the general lighting sector, is tied to its ability to increase LED efficiency and color uniformity while decreasing the costs of producing, purchasing, and operating LEDs. Research is supported by governments of China, the European Union, Japan, the Republic of Korea, and the United States. Because of the volume of ongoing research in this sector, it is likely that the material requirements of future LEDs may be quite different than LEDs currently (2011) in use as industry attempts to cut costs by reducing material requirements of expensive heavy rare-earth phosphors and increasing the sizes of wafers for economies of scale. Improved LED performance will allow customers to reduce the number of LEDs in automotive, electronic

  4. The hidden costs of installing Xpert machines in a tuberculosis high-burden country: experiences from Nigeria.

    Science.gov (United States)

    Abdurrahman, Saddiq Tsimiri; Emenyonu, Nnamdi; Obasanya, Olusegun Joshua; Lawson, Lovett; Dacombe, Russell; Muhammad, Muhammad; Oladimeji, Olanrewaju; Cuevas, Luis Eduardo

    2014-01-01

    Since the endorsement of GeneXpert MTB/RIF by the WHO, many countries have embarked on implementing this technology. We outline the cost of installing GeneXpert in district hospitals in Abuja, Nigeria. We prospectively documented costs related to the installation of GeneXpert at five sites. Costs were collected from receipts received from suppliers and normalized to USD 2012 values. Costs were often identified after initiating installation for many reasons. Installation varied widely between sites with sufficient space and power supply; sites with insufficient space or power supply and costs not directly associated with site installation. The basic cost for installation was USD 2,621.98 per machine. Sites that required additional space cost close to USD 7,000.00. Space and power requirements have a significant effect on installation costs. Countries need to carefully consider the placement of Xpert machines based on the quality and size of the available infrastructure.

  5. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, Hyungkyoo; Jung, Hoansung; Lim, Incheol; Ahn, Gukhoon

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30 MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extent of sags occur. HANARO has the reactor regulation system(RRS) and reactor protection system(RPS). HANARO is designed so as to be tripped automatically by insertion of control absorber rods(CAR) and shut-off rods(SOR). When voltage sag or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator on the power supply for CARs and SORs so as to prevent an unwanted trip. We undertook voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator. (author)

  6. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, H. K.; Jung, H. S.; Ahn, G. H.; Lim, I. C.

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extents of sags occur. HANARO has the reactor regulation system (RRS) and reactor protection system (RPS). HANARO is designed so as to tripped automatically by insertion of control absorber rods (CAR) and shut-off rods (SOR). When voltage or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator on the power supply for CARs and SORs so as to prevent an unwanted trip. We undertook voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator

  7. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  8. Supply risks associated with CdTe and CIGS thin-film photovoltaics

    International Nuclear Information System (INIS)

    Helbig, Christoph; Bradshaw, Alex M.; Kolotzek, Christoph; Thorenz, Andrea; Tuma, Axel

    2016-01-01

    Highlights: • Supply risks associated with thin film photovoltaic technologies are considered. • Eleven supply risk indicators are used to evaluate Cd, Te, Cu, In, Ga, Se and Mo. • Indicator weighting based on peer assessment and an Analytic Hierarchy Process. • Various possibilities for the aggregation of elemental supply risks discussed. • Aggregated results show a marginally lower supply risk for CdTe than for CIGS. - Abstract: As a result of the global warming potential of fossil fuels there has been a rapid growth in the installation of photovoltaic generating capacity in the last decade. While this market is dominated by crystalline silicon, thin-film photovoltaics are still expected to make a substantial contribution to global electricity supply in future, due both to lower production costs and to recent increases in conversion efficiency. At present, cadmium telluride (CdTe) and copper-indium-gallium diselenide (CuIn_xGa_1_−_xSe_2) seem to be the most promising materials and currently have a share of ≈9% of the photovoltaic market. An expected stronger market penetration by these thin-film technologies raises the question as to the supply risks associated with the constituent elements. Against this background, we report here a semi-quantitative, relative assessment of mid- to long-term supply risk associated with the elements Cd, Te, Cu, In, Ga, Se and Mo. In this approach, the supply risk is measured using 11 indicators in the four categories “Risk of Supply Reduction”, “Risk of Demand Increase”, “Concentration Risk” and “Political Risk”. In a second step, the single indicator values, which are derived from publicly accessible databases, are weighted relative to each other specifically for the case of thin film photovoltaics. For this purpose, a survey among colleagues and an Analytic Hierarchy Process (AHP) approach are used, in order to obtain a relative, element-specific value for the supply risk. The aggregation of these

  9. Regulation for installation and operation of reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning the description of an application for the approval of installation of a reactor, stipulated in Article 23 paragraph 2 of the Law for Regulation of Nuclear Source Materials, Nuclear Fuel Materials and Reactors (hereinafter referred to as the Law), the following items must be written. Namely, the heat output of the reactor in Article 23 paragraph 2 item 3 of the Law, the position, structure and facilities of the reactor facilities, described according to the stipulated classifications, the work plan, nuclear fuel materials employed, and the disposal of spent fuel. Concerning an application for the approval of a reactor installed aboard a foreign ship, stipulations are made separately. Description of an application for the approval of change of the heat output of a reactor and others should include the stipulated items. When it is wished to undergo inspection of the construction and performance of reactor facilities, an application for that end including the required items should be filed. Various safety measures preventing personnel from being exposed to radiation should be taken. When a foreign atomic-powered ship tries to enter a Japanese port, the stipulated necessary informations should be reported 60 days before such ship actually enters the Japanese port. A chief technician of reactors should take and pass the official examination. (Rikitake, Y.)

  10. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  11. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  12. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  13. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  14. MIG version 0.0 model interface guidelines: Rules to accelerate installation of numerical models into any compliant parent code

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, R.M.; Wong, M.K.

    1996-08-01

    A set of model interface guidelines, called MIG, is presented as a means by which any compliant numerical material model can be rapidly installed into any parent code without having to modify the model subroutines. Here, {open_quotes}model{close_quotes} usually means a material model such as one that computes stress as a function of strain, though the term may be extended to any numerical operation. {open_quotes}Parent code{close_quotes} means a hydrocode, finite element code, etc. which uses the model and enforces, say, the fundamental laws of motion and thermodynamics. MIG requires the model developer (who creates the model package) to specify model needs in a standardized but flexible way. MIG includes a dictionary of technical terms that allows developers and parent code architects to share a common vocabulary when specifying field variables. For portability, database management is the responsibility of the parent code. Input/output occurs via structured calling arguments. As much model information as possible (such as the lists of required inputs, as well as lists of precharacterized material data and special needs) is supplied by the model developer in an ASCII text file. Every MIG-compliant model also has three required subroutines to check data, to request extra field variables, and to perform model physics. To date, the MIG scheme has proven flexible in beta installations of a simple yield model, plus a more complicated viscodamage yield model, three electromechanical models, and a complicated anisotropic microcrack constitutive model. The MIG yield model has been successfully installed using identical subroutines in three vectorized parent codes and one parallel C++ code, all predicting comparable results. By maintaining one model for many codes, MIG facilitates code-to-code comparisons and reduces duplication of effort, thereby reducing the cost of installing and sharing models in diverse new codes.

  15. Risks and benefits of compost-like materials prepared by the thermal treatment of raw scallop hepatopancreas for supplying cadmium and the growth of alfalfa (Medicago sativa L.).

    Science.gov (United States)

    Ushijima, Kensuke; Fukushima, Masami; Kanno, Shinya; Kanno, Itoko; Ohnishi, Mitsuhiro

    2016-01-01

    Scallop hepatopancreas, fishery waste, contains relatively high levels of Cd and organic nitrogen compounds, the latter of which represent a fertilizer. In this study, raw scallop hepatopancreas tissue was thermally treated with sawdust and red loam in the presence of an iron catalyst to produce compost-like materials (CLMs). Two CLM samples were prepared by varying the content of raw scallop hepatopancreas tissue: 46 wt.% for CLM-1 and 18 wt.% for CLM-2. Mixtures of control soil (CTL) and CLMs (CLM content: 10 and 25 wt.%) were examined for the growth of alfalfa (Medicago sativa L.) to evaluate the risks and benefits of using this material for fertilization. The Cd content in shoots and roots of alfalfa, that were grown in the presence of CLMs, was significantly higher than those for the plants grown in the CTL, indicating that Cd had accumulated in the plants from CLMs. The accumulation of Cd in the alfalfa roots was quite high in the case of the 25% CLM-1 sample. However, alfalfa growth was significantly promoted in the presence of 10% CLM-1. This can be attributed to the higher levels of nitrogen and humic substances, which serve as fertilizer components. Although the fertilization effect in case of CLM-1showed a potential benefit, the accumulation of Cd in alfalfa was clearly increased in the presence of both CLMs. In conclusion, the use of CLMs produced from raw scallop hepatopancreas tissue can be considered to have a desirable benefit from standpoint of its use as fertilizer, but is accompanied by a risk of the accumulation of Cd in alfalfa plants.

  16. Business Modeling - Supply Chain Management

    OpenAIRE

    Abdillah, Leon

    2017-01-01

    BM-SCM consists of: 1) Introduction, 2) Basic Concepts, 3) Inventory Management, 4) Forecasting Material, 5) Requirements, ) Transportation Management, 7) Vendor Management, 8) Warehouse Management, 9) Cross Docking, 10) Third Party Logistics (3PLs), 11) IT in Supply Chain, and 12) Presentations.

  17. Economic drivers of mineral supply

    Science.gov (United States)

    Wagner, Lorie A.; Sullivan, Daniel E.; Sznopek, John L.

    2003-01-01

    The debate over the adequacy of future supplies of mineral resources continues in light of the growing use of mineral-based materials in the United States. According to the U.S. Geological Survey, the quantity of new materials utilized each year has dramatically increased from 161 million tons2 in 1900 to 3.2 billion tons in 2000. Of all the materials used during the 20th century in the United States, more than half were used in the last 25 years. With the Earth?s endowment of natural resources remaining constant, and increased demand for resources, economic theory states that as depletion approaches, prices rise. This study shows that many economic drivers (conditions that create an economic incentive for producers to act in a particular way) such as the impact of globalization, technological improvements, productivity increases, and efficient materials usage are at work simultaneously to impact minerals markets and supply. As a result of these economic drivers, the historical price trend of mineral prices3 in constant dollars has declined as demand has risen. When price is measured by the cost in human effort, the price trend also has been almost steadily downward. Although the United States economy continues its increasing mineral consumption trend, the supply of minerals has been able to keep pace. This study shows that in general supply has grown faster than demand, causing a declining trend in mineral prices.

  18. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  19. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  20. Adhesion analysis between metal supplies and composites materials reinforce with glass fiber; Analise de adesao antre materiais metalicos e materiais compositos reforcados com fibra e vidro

    Energy Technology Data Exchange (ETDEWEB)

    Oushiro, Karol B.; Costa, Anahi P. da; Botelho, Edson C. [UNESP, Guaratingueta, SP (Brazil). Faculdade de Engenharia. Dept. de Materiais e Tecnologia], e-mail: kaoushiro@hotmail.com; Costa, Michelle L. [UNESP, Guaratingueta, SP (Brazil). Faculdade de Engenharia. Dept. de Materiais e Tecnologia; Instituto de Aeronautica e Espaco (AMR/IAE/DCTA), Sao Jose dos Campos, SP (Brazil). Div. de Materiais

    2011-07-01

    The appearance of defects, mainly thinning caused by corrosion, is unavoidable in pipeline transport of fluids. Many repair techniques have been developed, among them, has been highlighting the pipeline repair with composite that is to involve the passage of the corroded pipeline with composite material. The study of these techniques is of great interest for the branch industry, since the efficiency of repair will depend on good adhesion between the repair composite and steel pipe. In this work, the bond strength between fiber glass/epoxy composite bonded to a steel tubing used in petrochemical plants was evaluated by mechanical testing of lap shear (ASTM D1002). These samples were conditioned using 2000 thermal shock cycles, and the mechanical results of the conditioned and non-conditioned samples were compared. With this, we observed that the polymer composites can be successfully used for repair of metallic pipes with petrochemical application, because when exposed to sudden temperature changes their mechanical properties (shear) remained practically unchanged. (author)

  1. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  2. Installation of the backfill and plug test

    International Nuclear Information System (INIS)

    Gunnarsson, D.; Borgesson, L.; Hokmark, H.; Hohannesson, L.E.; Sanden, T.

    2003-01-01

    The Backfill and Plug Test is a full scale test of backfill material, backfilling technique and a tunnel plug. The main objectives of the Backfill and Plug Test are: - to develop and test different materials and compaction techniques for backfilling of tunnels excavated by blasting; - to test the function of the backfill and its interaction with the surrounding rock in a tunnel excavated by blasting; - to develop technique for building tunnel plugs and to test the function. The installation was made in the Swedish underground laboratory, Aspo HRL, during 1999. The inner part of the tunnel is not used for the test but was filled with drainage material. The test volume, which is about 28 m long, can be divided into the following three parts: - the inner part filled with backfill containing 30% bentonite; - the outer part filled with backfill without bentonite and bentonite blocks and pellets at the roof; - the plug. Permeable layers divide the test volume into 11 test sections. The permeable layers are used for increasing the water saturation rate in the backfill and for applying hydraulic gradients between the layers for studying the flow of water in the backfill and in the near field rock. The permeable layers were installed every 2.2 m and each layer is divided into three units in order to separately measure the flow close to the roof, in the central areas of the tunnel and close to the floor. The outer part ends with a wall of prefabricated concrete beams that were used for temporary support of the backfill during the casting of the plug. The upper volume close to the plug is filled with bentonite pellets and blocks consisting of 20% bentonite and 80% sand. The backfill is instrumented with 34 pore water pressure cells, 21 total pressure cells, 57 sensors for monitoring the water saturation and 13 gauges for measuring the local hydraulic conductivity. The water pressures in the permeable mats are measured in all sections. Four pressure cylinders, 2 in the roof

  3. Lean Construction Supply Chain : A Literature Review

    OpenAIRE

    Ren, Jiamei

    2012-01-01

    The aim of this thesis is to enhance the management of supply systems in construction industry using lean principles. This study is an attempt to identify what kind of activities causes’ construction process delay and how to perform lean concept into supply chain in practice. The objective is to assure on-time delivery of information and materials to construction sites at lowest cost and maximum value for the customer. These study problems have been analysed from a lean construction supply ch...

  4. SNS AC Power Distribution and Reliability of AC Power Supply

    CERN Document Server

    Holik, Paul S

    2005-01-01

    The SNS Project has 45MW of installed power. A design description under the Construction Design and Maintenance (CDM) with regard to regulations (OSHA, NFPA, NEC), reliability issues and maintenance of the AC power distribution system are herewith presented. The SNS Project has 45MW of installed power. The Accelerator Systems are Front End (FE)and LINAC KLYSTRON Building (LK), Central Helium Liquefier (CHL), High Energy Beam Transport (HEBT), Accumulator Ring and Ring to Target Beam Transport (RTBT) Support Buildings have 30MW installed power. FELK has 16MW installed, majority of which is klystron and magnet power supply system. CHL, supporting the super conducting portion of the accelerator has 7MW installed power and the RING Systems (HEBT, RING and RTBT) have also 7MW installed power.*

  5. VG-400 atomic power and technological installation. Possible core design

    International Nuclear Information System (INIS)

    Komarov, E.V.; Laptev, F.V.; Lyubivyj, A.G.; Mitenkov, F.M.; Samojlov, O.B.; Sukhachevskij, Yu.B.

    1979-01-01

    The main characteristics, basic circuit and configuration of equipment of the VG-400 atomic power and technological installation are considered. This installation is intended for supplying with highly-potential heat of thermal electrochemical hydrogen production and for power generation in the steam-turbine cycle. The main installation characteristics: HTGR reactor heat power 1100 MW, electric power 300 MW, helium coolant pressure 50 atm, output temperature 950 deg C, steam pressure in the second contour 175 atm, temperature 535 deg C, core diameter and height 6.4 m and 4 m, respectively, number of spherical fuel elements 8.5x10 5 . The installation can ensure hydrogen production of 10 5 Nxm 3 /h. For the VG-400 reactor block the integral arrangement of the first circuit equipment in the reinforced concrete is chosen. Two versions of the reactor core with prismatic and spherical fuel elements are compared. It is shown that taking into account great potentialities of the spherical zone in a case of further temperature increase and its positive qualities with respect to construction and processing of fuel elements and graphite blocks, the utilization of simplier units and mechanisms in the overloading system and in the process of profiling of energy distribution the choice of the spherical configuration for the VG-400 pilot plant installation seems to be valid

  6. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  7. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  8. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  9. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  10. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  11. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  12. Magnet power supply as a network object

    International Nuclear Information System (INIS)

    Cohen, S.; Stuewe, R.

    1991-01-01

    Magnet power supplies with embedded microprocessor controls are being installed in the beam-lines of the linear accelerator and proton storage ring at LAMPF. Using an RS422 link they communicate with the accelerator control system through a terminal server connected to the site-wide DECnet backbone. Each supply is, for all intents and purposes, a network object. The controller has a command set of over seventy-five three-character ASCII control and read-back instructions. Strategies for choosing the appropriate control protocol and the process of integrating these devices into a large accelerator control system will be presented. 7 refs., 2 figs., 1 tab

  13. Safety installation for preventing pollution by pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Wittgenstein, G F

    1972-10-25

    A safety installation for preventing pollution by pipelines, particularly those used for transporting liquid hydrocarbons, is described. It is applicable to any pipeline, but particularly to underground or submarine pipelines, whether made of steel, plastics, or any other material. The 4 essential objects of the invention are to insure reliable prevention of pollution of the environment due to leakage of a hydrocarbon through cracks in the pipe; to evacuate the leakage flow without delay to a vessel; to signal almost instantaneously the existence of a leak; and to effect remote control of operations by which the dynamic pressure in the pipe is cancelled. Each equipped section consists of a fluid-type jacket of plastic material which surrounds the pipe, which at its ends is sealed off. It is these seals which delimit the sections. (7 claims)

  14. Manufacture and installation of JET MKII divertor support structure

    International Nuclear Information System (INIS)

    Celentano, G.; Altmann, H.; Macklin, B.; Miele, P.; Pick, M.A.; Tait, J.; Moletta, L.; Romagnolo, A.; Shaw, R.

    1995-01-01

    The water cooled support structure, comprising twenty-four modules is the main component of the JET MKII divertor system. It is to be installed in the vacuum vessel with high accuracy with respect to the magnetic center and the other in-vessel components. The paper describes the design and manufacturing cycle including the required tolerances, the assembly and installation method and the material production process required to ensure the accuracy and reliability of the MKII support structure system. The water cooling holes, machined into the support structure require the procurement of special material to prevent risks of leaks inside the vacuum vessel

  15. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  16. Uncertainties in the Bidirectional Biodiesel Supply Chain

    NARCIS (Netherlands)

    Bot, Pieter; van Donk, Dirk Pieter; Pennink, Bartjan; Simatupang, Togar M.

    2015-01-01

    For remote areas, small-scale local biodiesel production is particularly attractive if producers and consumers are the same. Such supply chains are labeled as bidirectional. However, little is known on how raw material supply, transportation, logistics, production and operations uncertainties impact

  17. Design Principles for Closed Loop Supply Chains

    NARCIS (Netherlands)

    H.R. Krikke (Harold); C.P. Pappis (Costas); G.T. Tsoulfas; J.M. Bloemhof-Ruwaard (Jacqueline)

    2001-01-01

    textabstractIn this paper we study design principles for closed loop supply chains. Closed loop supply chains aim at closing material flows thereby limiting emission and residual waste, but also providing customer service at low cost. We study 'traditional' and 'new' design principles known in the

  18. Adding a small hydroelectric power plant to the drinking water supply of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'eau potable de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The actual drinking water supply no longer satisfies the needs of the Liddes community (southwestern Switzerland). This final report prepared for the Swiss Federal Office of Energy (SFOE) describes the results of a study for an enhanced water supply system including a small hydroelectric power plant. The authors propose to collect the water of two sources of the mountain torrent Aron and to use the considerable pressure difference for power generation. Four variants have been studied differing in the exact height difference, the flow rate and the location of the turbine building. The recommended variant delivers a nominal flow of 18 l/s at difference in height of 377 m to a Pelton turbine equipped with a single injector, resulting in an electrical power output of 54 kW. Electrical power production would amount to 281,000 kWh/year and the production cost to 0.126 CHF/kWh.

  19. B-Plant canyon fire foam supply

    International Nuclear Information System (INIS)

    Gainey, T.

    1995-01-01

    A new raw water supply was installed for the B-Plant fire foam system. This document details tests to be performed which will demonstrate that the system can function as designed. The tests include: Verification of the operation of the automatic valves at the cells; Measurement of water flow and pressure downstream of the proportioner; Production of foam, and measurement of foam concentration. Included as an appendix is a copy of the work package resolution (J4 ampersand J4a)

  20. Acquired experience resulting from transforming a chemical installation into a nuclear one

    Energy Technology Data Exchange (ETDEWEB)

    Zamfirache, M.; Stefan, L.; Bornea, A.; Stefanescu, I. [National Research and Development Institute for Cryogenics and Isotopic Technologies - ICIT, Uzinei (Romania)

    2015-03-15

    ICIT-Valcea has developed an experimental pilot-scale installation for tritium and deuterium separation. The main objective of this pilot was to demonstrate the water detritiation technology and to transfer this technology to the CANDU reactors of the Cernavoda nuclear power plant. The pilot-scale installation was initiated in 1992. The initial design and construction were performed similarly to chemical plants as the separation of isotopes was focused on only hydrogen and deuterium to assess feasibility. In a second phase we have begun to transform it into a nuclear facility with the aim of separating tritium. Moving to tritium separation has imposed a lot of changes. Changes consisted mainly of: -) re-design of the technological systems for nuclear material processing, applying specific codes and standards (ASME, Romanian nuclear specific pressure boundary prescriptions for code classification); -) design and implementation of new systems, classified as safety systems; -) re-design and implementation of command and control systems, complying with the requirements of reliability and maintenance required for the project promoted; -) revaluation of auxiliary systems (utilities, power supply); -) implementing radiation protection systems, including secondary barriers; -) implementing and maintaining environment operational program specific to the new nuclear plant; -) developing and conducting safety analyzes; and -) the production of specific documentation to obtain the necessary permits for construction, commissioning and operation of the plant.

  1. The balance of uranium supply and demand to 1990

    International Nuclear Information System (INIS)

    Erkes, P.

    1980-01-01

    The subject is discussed under the following headings: lead times in the nuclear industry; short term flexibilities -impact on demand of changes in tails assay and effect on supply of changed operating characteristics; supply-demand balance (Uranium Institute methodology); installed nuclear capacity forecast; enrichment capacity forecast; uranium production projections; estimates of uranium supply and demand until 1990; the effect of stockpiling; recent influences on the supply and demand balance; the Harrisburg experience; the International Fuel Cycle Evaluation (INFCE); the oil price spiral; conclusions. (U.K.)

  2. Commercium Interruptus: Supply Chain Responses to Disaster

    National Research Council Canada - National Science Library

    Thomas, Rosalind

    2003-01-01

    The industrial base that the Department of Defense (DoD) depends on for weapon systems and other materials has participated in the transition to supply chain management along with the rest of industry...

  3. Decree of 4 September 1969, Stb. 403, concerning the implementation of Sections 16, 17, 19, paragraph 1 and 21 of the Nuclear Energy Act (Nuclear Installations, Fissionable Materials and Ores)

    International Nuclear Information System (INIS)

    1969-01-01

    This Decree lays down the licensing system for fissionable materials and ores except during transport or storage incidental to transport. It also provides for a procedure for objections by third parties against the granting of a licence. Such licences are granted jointly by the Minister for Economic Affairs and the Minister for Social Affairs and Public Health, where necessary in agreement with the other Ministers concerned. (NEA) [fr

  4. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  5. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  6. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  7. Commercial and industrial electric installations

    International Nuclear Information System (INIS)

    Carvajal, Carreno; William

    2000-01-01

    The proliferation of computers and other sensitive elements in the office ambient and of factory it has fomented the necessity to design the electric systems of the buildings considering topics of quality in the supply of the electric power (Power Quality). Exists great quantity of literature regarding the diagnosis and solution of quality problems of the supply in existent structures, but little allusion is made, to the design considerations to minimize this problem from the construction moment. The main focus of this article is of wired technical and on setting to earth recommended for the design of new structures

  8. Quality assurance in nuclear installations

    International Nuclear Information System (INIS)

    Torres M, Nelson.

    1985-08-01

    It has been proven that the bad quality of products, equipment, installations, and services is not due to the lack of tests, experiments and verifications. The main causes are associated with insufficient organization of the activities that have influence on the quality. The garantee of quality is conceptualized as an appropriate instrument composed of normalized criteria initially in advanced technologies. Such as nuclear science and aerospace technology. However, with the appropriate modifications it can be applied to conventional technologies

  9. Method of installing well conductors

    International Nuclear Information System (INIS)

    Houser, D.M.

    1991-01-01

    This patent describes a method of installing a well conductor in a marine environment. It comprises sealing a well conductor with a watertight plug; submerging the conductor from an elevated platform; adding additional conductor lengths to the conductor as needed thereby forming a conductor string; adjusting the buoyancy of the string to control the lowering of the string to the sea floor; and drilling through the plug after the conductor string has achieved the desired penetration depth

  10. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  11. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  12. Safety requirements and radiological protection for ore installations

    International Nuclear Information System (INIS)

    2003-06-01

    This norm establishes the safety and radiological protection requirements for mining installations which manipulates, process and storing ores, raw materials, steriles, slags and wastes containing radionuclides of the uranium and thorium natural series, simultaneously or separated, and which can cause undue exposures to the public and workers, at anytime of the functioning or pos operational stage. This norm applies to the mining installations activities, suspended or which have ceased their activities before the issue date of this norm, destined to the mining, physical, chemical and metallurgical processing, and the industrialization of raw materials and residues containing associated radionuclides from the natural series of uranium and thorium, including the stages of implantation, operation and decommissioning of the installation

  13. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  14. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  15. Basis of conception for emergency plans of fuel cycle installations; Bases de conception des plans particuliers d`intervention des installations du cycle du combustible

    Energy Technology Data Exchange (ETDEWEB)

    Charles, T.; Mercier, J.P. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. d`Evaluation de Surete; Rzepka, J.P.; Dubiau, P.; Jouve, A.C. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. de Protection de l`Environnement et des Installations

    1994-12-31

    In this text we give the principles on which the fuel cycle installations emergency plans are based. The bases are the inventory of toxic and radioactive materials contained in the installation, the credible accident and the source term, the atmospheric diffusion. On these terms the risk for population is evaluated and relocation or confinement of population is taken.

  16. Laser power supply

    International Nuclear Information System (INIS)

    Bernstein, D.

    1975-01-01

    The laser power supply includes a regulator which has a high voltage control loop based on a linear approximation of a laser tube negative resistance characteristic. The regulator has independent control loops for laser current and power supply high voltage

  17. Installation of the Ion Accelerator for the Surface Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Hyeok-Jung; Kim, Han-Sung; Chung, Bo-Hyun; Ahn, Tae-Sung; Kim, Dae-Il; Kim, Cho-Rong; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In this paper, an introduction to the accelerator, an installation status at KOMAC and the operation plan of the accelerator are discussed. A pelletron, which has been used over 25 years at KIGAM, is moved and installed at KOMAC in order to supply a qualified service to ion beam users. The system will be installed in September and component tests will be carried. The operation of the system starts in 2016 after it gets operation license from Nuclear Safety and Security Commission. Korea Multi-purpose Accelerator Complex (KOMAC) is operating several ion beam accelerators to provide various ion beams to users. Those are a 100 MeV proton linear accelerator, a 220 keV ion implanter for gaseous ion beams, a 150 keV metal ion implanter and a 20 keV high-current ion implanter. All of those are the machine for user service and it is important to qualify the results of the irradiation conditions for user service. For this reason, an electrostatic tandem accelerator, which has been operating over 25 years at Korea Institute of Geoscience and Mineral Resources (KIGAM), is moved to KOMAC in order to supply the qualified and quantified data on the irradiation species.

  18. Supply Cain Risk Management

    OpenAIRE

    Goodwin, Les

    2011-01-01

    “The management of supply chain risk is crucial to any business, more so to Rolls Royce who face an almost doubling of load within the next 10 years. So what is supply chain risk management and how well is it deployed within an operational business of Rolls Royce? What are the tools and techniques available and what are the key issues around implementing world class supply chain risk management with a Supply Chain Unit within Rolls Royce?”

  19. Solar hot water system installed at Las Vegas, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

  20. Method for laboratory tests on noise emission from appliances used in water supply installations. Part 2:mounting and operating conditions for draw off taps and mixing valves; Kyusui kigu hasseion no jikkenshitsu sokuteiho dai2bu,. Kyusui oyobi kongo suisen no toritsuke houho narabini sado joken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This standard prescribes the laboratory of the water utensil occurrence sound prescribed with JIS A 1424-1 about the installation method of a water stopper to measure water utensil occurrence sound, and the mixed water stopper and the operation condition by the way of examining it, the test device in the way of measuring it. Or, the water stopper made the target, and a mixed water stopper were decided to be designed by the water pressure of the range of 0.1 - 0.5 MPa so that the building (sink, wash and bathtub) might do the use of the cold water in the neighborhood of the building and the warm water. The valve, which has an automatic temperature adjustment, mixed water stopper; a direct exit to the inside is excluded from the object. Moreover, an electric operation dialect is a combination device and this is excluded from the object. (NEDO)

  1. Alignment of global supply networks based on strategic groups of supply chains

    Directory of Open Access Journals (Sweden)

    Nikos G. Moraitakis

    2017-09-01

    Full Text Available Background: From a supply chain perspective, often big differences exist between global raw material suppliers’ approaches to supply their respective local markets. The progressing complexity of large centrally managed global supply networks and their often-unknown upstream ramifications increase the likelihood of undetected bottlenecks and inefficiencies. It is therefore necessary to develop an approach to strategically master the upstream complexity of such networks from a holistic supply chain perspective in order to align regional competitive priorities and supply chain structures. The objective of this research is hence to develop an approach for the supply-chain-based alignment of complex global supply networks. Method: We review existing literature from the fields of supply chain and network management, strategic sourcing, and strategic management. Based on the literature review and theoretical and practical considerations we deduce a conceptual approach to consider upstream supply chain structures in supply network alignment initiatives. Results: On the basis of these considerations and current empirical literature we transfer strategic group theory to the supply network management context. The proposed approach introduces strategic groups of supply chains as a segmentation criterion for complex global supply networks which enables the network-wide alignment of competitive priorities. Conclusion: Supply-chain-based segmentation of global supply network structures can effectively reduce the complexity, firms face when aiming to strategically align their supply chains on a holistic level. The results of this research are applicable for certain types of global supply networks and can be used for network alignment and strategy development. The approach can furthermore generate insights useable for negotiation support with suppliers.

  2. Design of efficient and safe sanitary installations; Ontwerpen van zuinige en veilige sanitaire installaties

    Energy Technology Data Exchange (ETDEWEB)

    Scheffer, W.; Pieterse-Quirijns, I.; Van Bergen, R.; Van Bruggen, M.; Nuijten, O.; Van der Lugt, W.; Wilschut, M.; Van Oostwaard, T.; Van Rijn, B.; Leiting, E.

    2012-12-15

    In this issue of ThemaTech several aspects regarding the title topic are discussed in 9 articles: hygienic and efficient design of main water supply systems, the scope of sustainable design and installation, calculation rules for the design of main water supply systems, prevention of Legionella in tap water, new calculation rules in comparison with the q{open_square}n method, energy efficient and safe thermal disinfection, urine as a source of useful materials, advise on legionella prevention for public water systems, saving cost with legionella prevention in the building process [Dutch] In deze aflevering van ThemaTech worden diverse aspecten m.b.t. het titel onderwerp behandeld in 9 artikelen: beter hygienisch en zuinig ontwerp van leidingwaterinstallaties, de reikwijdte van duurzaam ontwerpen en installeren, rekenregels voor het ontwerp van leidingwaterinstallaties, legionellapreventie in leidingwater, nieuwe rekenregels in vergelijking met de q{open_square}n method, energiezuinige en veilige thermische desinfectie, urine als bron van grondstoffen, advisering over legionella preventie voor collectieve leidingwaterinstallaties, kostenbesparing van legionellapreventie in het bouwproces.

  3. Energy supply. Energieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Eickhof, N.

    1983-01-01

    This anthology presents nine papers dealing with the following subjects: 1) international and national aspects of energy supply, 2) regional and local energy supply concepts, and 3) issues of district-heat supply. Each of the nine papers was entered separately.

  4. Gas supply device

    International Nuclear Information System (INIS)

    Yamamoto, Tokihiro.

    1986-01-01

    Purpose: When injecting gas during plasma discharge, to prevent erronous operation of the piezoelectric valves due to vibrations and to inject gas into the vacuum vessel by accurately controlling gas flow. Constitution: The piezoelectric valve designed to control the flow of gas when charging vacuum vessels is installed between the vacuum vessel and the gas cylinder and a pulse voltage generator to control the valve (open/close) and the reverse voltage generator to apply a reverse current to the valve element are also provided. When a voltage is applied to the piezoelectric element, the piezoelectric element bends. However, when the polarity is changed, the direction of the bend is also reversed. The seat portion is pressed in proportion to the degree of bending. When gas is injected while plasma is being discharged, the gap created, due to vibrations, between the piezoelectric element and the sealing material is prevented by the application of a reverse current. This allows precise control of the gas injection volume as well as the injection interval. This assures maintenance of precise test conditions when testing thermonuclear devices. (Horiuchi, T.)

  5. Legal aspects of nuclear fuel supply

    International Nuclear Information System (INIS)

    Sartorelli, C.

    1981-10-01

    This paper discusses the problems of nuclear fuel supply in the context of the types of purchase of uranium, the different technical operations involved (enrichment, reprocessing) and finally, the control exercised over such materials in the framework of IAEA Safeguards and the ''London Club'' agreement between the supplying countries. A description follows of the functions of the Euratom Supply Agency in application of the Euratom's Treaty's provisions on the principle of equal access to ores, source and special fissile materials for Community countries. (NEA) [fr

  6. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  7. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  8. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  9. Massive scale production and installation of flexible printed solar cells

    DEFF Research Database (Denmark)

    Hösel, Markus

    Printed solar cells can be prepared on a large scale (kilometers) on relatively small equipment using little material. The performance and lifetime are lower and shorter than many conventional PV technology but manufacturing speed, manufacturing cost, energy pay back time and installation speed can...... by far exceed known energy technologies with a significant potential for further improvement through architecture development and process intensification....

  10. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, Hyung Kyoo; Jung, Hoan Sung; Lim, In Cheol; Ahn, Guk Hoon

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extent of sags occur. HANARO has the reactor regulation system(RRs) and reactor protection system(RPS). HANARO is designed so as to be tripped automatically by insertion of control absorber rods(CAR) and shut off rods(SOR). When voltage sag or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator

  11. Report on the behalf of the Commission for Foreign Affairs, Defence and Armed Forces on the bill proposition adopted by the National Assembly, related on the strengthening of the protection of civil installations containing nuclear materials. Nr 446

    International Nuclear Information System (INIS)

    Pintat, Xavier

    2015-01-01

    In its first part, this report presents the nuclear sector as a sensitive sector under strict surveillance: a sector of critical importance (safety policy with its actors and its multi-level planning, a safety arrangement for the nuclear energy sector), a regulation specific to the nuclear sector, and specialised protection forces. It also addresses the issues of intrusions and over-flights (overview of intrusions, unsuitable penal repression, and new dimension of air safety due to the development of civil uses of drones). The next part comments the content of the bill proposition, and addresses the lack of a suitable penal regime for the protection of nuclear materials and of areas regarding defence. The scope of application of the bill proposition is discussed, as well as the applicable and additional penalties. A list of hearings is provided as well as non adopted amendments and a table proposing a comparison between different versions of the text

  12. DAΦNE magnet power supply system

    International Nuclear Information System (INIS)

    Ricci, R.; Sanelli, C.; Stecchi, A.

    1998-01-01

    The e + -e - , 1020 MeV at center of mass, Particle Accelerator Complex DAΦNE, consists of a linear accelerator (Linac), a damping ring (D.A.), nearly 180 m of transfer lines (T.L.) and two storage rings (S.R.), that intersect each other in two points (I.P.), for Φ particle production. The D.A., T.L. and S.R. magnets are powered by means of 462 power supplies, rating from 100 W to 1 MW. The very different output currents, from 10 A to 2300 A, and output voltages, from 8 V to 1300 V, imposed many different technical solution realized by the world industry. This paper describes the Power Supply System giving also a description of the different typologies, their characteristics and control systems. The paper reports also the power supply performances and gives information on their installation and first year operation period

  13. Acidente com material biológico entre trabalhadores da área de expurgo em centros de material e esterilização - DOI: 10.4025/actascihealthsci.v26i2.1577 Accident with biological material with workers of expurgation area in central supply - DOI: 10.4025/actascihealthsci.v26i2.1577

    Directory of Open Access Journals (Sweden)

    Shellen Bueno de Souza

    2004-04-01

    Full Text Available A limpeza dos artigos odonto-médico-hospitalares realizada por métodos manuais aumenta o risco de acidentes com material biológico. Foram objetivos deste estudo caracterizar os acidentes envolvendo exposição a material biológico entre trabalhadores de expurgos; identificar a freqüência da subnotificação dos acidentes e descrever as medidas de prevenção adotadas. Após aprovação em comitê de ética e consentimento dos trabalhadores, os dados foram coletados mediante entrevista com 111 trabalhadores de Centros de Material e Esterilização de hospitais da cidade de Goiânia, Estado de Goiás. Evidenciou-se que (33 29,8% dos profissionais relataram ter sofrido acidentes, destes (24 72,7% foram notificados e nove (27,3% não foram. A maioria (92,8% não soube citar os Equipamentos de Proteção Individual indicados para uso no expurgo. Os acidentes foram, predominantemente, ocasionados por objetos perfurocortantes, envolvendo membros superiores. Concluiu-se que a maioria dos profissionais não adere às medidas preventivas, o que os expõem a situações de risco que se agravam quando os acidentes não são notificados.The cleaning of odonto-medical-hospital articles made by handy methods increases the risk of accidents with biological material. This article has as purposes: to characterize accidents involving the exposure of expurgation’s workers to biological material; to identify the incidence of accident’s subnotifications and to describe the prevention’s steps chosen. After the approval of an Ethics Committee and the worker’s permission, the data were collected in an interview with 111 workers of Central Supply. These employers work in hospitals with a hundred or more beds, located in Goiânia-GO. The article showed that (33 29,8% of the workers listened said that they had accidents. Among these accidents, (24 72,7% were notified and nine woren’t. The majority of the workers, 92,8%, didn´t know the individual

  14. SIS: an accelerator installation for heavy ions of high energy

    International Nuclear Information System (INIS)

    The two major sections of the report cover the scientific experimental program and the accelerator installation. Topics covered in the first include: heavy ion physics in the medium energy region; nuclear physics at relativistic energies; atomic physics loss and capture cross sections for electrons; spectroscopy of few-electron systems; atomic collision processes; biological experiments; nuclear track techniques in biology; and experiments with protons and secondary radiation. The second includes: concept for the total installation; technical description of the SIS 12; technical description of the SIS 100; status of the UNILAC injector; development options for the SIS installations; properties of the heavy ion beam; and structural work and technical supply provisions. In this SIS project proposal, an accelerator installation based on two synchrotrons is described with which atomic nuclei up to uranium can be accelerated to energies of more than 10 GeV/μ. With the SIS 12, which is the name of the first stage, heavy ion physics at intermediate energies can be pursued up to 500 MeV/μ. The second stage, a larger synchrotron, the SIS 100, has a diameter of 250 m. With this device, it is proposed to open up the domain of relativistic heavy ion physics up to 14 GeV/μ (for intermediate mass particles) and 10 GeV/μ (for uranium)

  15. ACP Facility Safety Surveillance System Installation

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-10-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hotcell was built in the IMEF basement. All facilities which treat radioactive materials must manage CCTV system which is under control of Health Physics department. Three main points (including hotcell rear door area) have each camera, but operators who are in charge of facility management need to check the safety of the facility immediately through the network in his office. This needs introduce additional network cameras installation and this new surveillance system is expected to update the whole safety control ability with existing system

  16. Supply regimes in fisheries

    DEFF Research Database (Denmark)

    Nielsen, Max

    2006-01-01

    Supply in fisheries is traditionally known for its backward bending nature, owing to externalities in production. Such a supply regime, however, exist only for pure open access fisheries. Since most fisheries worldwide are neither pure open access, nor optimally managed, rather between the extremes......, the traditional understanding of supply regimes in fisheries needs modification. This paper identifies through a case study of the East Baltic cod fishery supply regimes in fisheries, taking alternative fisheries management schemes and mesh size limitations into account. An age-structured Beverton-Holt based bio......-economic supply model with mesh sizes is developed. It is found that in the presence of realistic management schemes, the supply curves are close to vertical in the relevant range. Also, the supply curve under open access with mesh size limitations is almost vertical in the relevant range, owing to constant...

  17. AGS tune jump power supply design and test

    International Nuclear Information System (INIS)

    Mi, J.; Glenn, J.W.; Huang, H.; Marneris, I.; Rosas, P.; Sandberg, J.; Tan, Y.; Zhang, W.

    2011-01-01

    A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

  18. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  19. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  20. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  1. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  2. The installation of helium auxiliary systems in HTGR

    International Nuclear Information System (INIS)

    Qin Zhenya; Fu Xiaodong

    1993-01-01

    The inert gas Helium was chosen as reactor coolant in high temperature gas coolant reactor, therefore a set of Special and uncomplex helium auxiliary systems will be installed, the safe operation of HTR-10 can be safeguarded. It does not effect the inherent safety of HTR-10 MW if any one of all those systems were damaged during operation condition. This article introduces the design function and the system principle of all helium auxiliary systems to be installed in HTR-10. Those systems include: helium purification and its regeneration system, helium supply and storage system, pressure control and release system of primary system, dump system for helium auxiliary system and fuel handling, gaseous waste storage system, water extraction system for helium auxiliary systems and evacuation system for primary system

  3. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  4. J.O. no. 10 of the 13 january 2004, page 991, text no. 14. Decrees, orders. General texts. Decree no. 2004-47 of the 12 january 2004 modifying the decree no. 96-978 of the 31 october 1996 relative to the creation of the nuclear installation no. 162 named EL4-D, installation of storage for the Monts d'Arree power plants materials; J.O. no. 10 du 13 janvier 2004, page 991, texte no. 14. Decrets, arretes, circulaires. Textes generaux. Decret no. 2004-47 du 12 janvier 2004 modifiant le decret no. 96-978 du 31 octobre 1996 relatif a la creation de l'installation nucleaire de base no. 162 denommee EL4-D, installation d'entreposage de materiels de la centrale nucleaire des monts d'Arree

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-06-01

    The reactor EL4, implemented in december 1966, has definitely shutdown on the 31 july 1985. This reactor was an industrial prototype, built and exploited by Cea and EDF. In the framework of the partial dismantling of the installation, the decree 96-978 of the 31 october 1996 agreed the Cea to modify the installation to become a storage installation. (A.L.B.)

  5. Synergy between the Multiple Supply Chain and Green Supply Chain Management (GSCM) approaches: an initial analysis aimed at fostering supply chain sustainability

    OpenAIRE

    Ana Lima de Carvalho; Livia Rodrigues Ignácio; Kleber Francisco Esposto; Aldo Roberto Ometto

    2016-01-01

    The concept of Green Supply Chain Management (GSCM) was created in the 90s to reduce the environmental impacts of productive systems. This approach seeks to improve the environmental performance of all the participants in a supply chain, from the extraction of raw materials to the use and final disposal of the product, through relationships of collaboration or conformity between the parties. The multiple supply chains approach established by Gattorna (2009) brought to light different supply c...

  6. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  7. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  8. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  9. Danish electricity supply. Statistik 1999

    International Nuclear Information System (INIS)

    2000-07-01

    The Association of Danish Electric Utilities issues each year the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The total electric power consumption in 1999 is almost the same as in 1998. There has been a moderate consumption increase in the households and the service sector whereas the consumption in industry has decreased. 1999 is the first year with actual competition in the power-producing sector. The increased competition from the Scandinavian hydro-electric power plants and the growing number of privately owned wind turbines and other decentralised power plants result in a decline in the power production at the electric utilities of 10% compared to the year 1998. In 1999 electric power from renewable energy sources such as wind, biomass, and waste covers close to 10% of the total Danish power consumption. More than 400 new turbines are installed in 1999 and the total capacity of wind power increases with ca. 20%. The actual energy content of the wind in 1999 was, however, 15% lower than normally which results in a significant reduction of the utilisation of the wind turbine capacity. (ln)

  10. Alignment of global supply networks based on strategic groups of supply chains

    OpenAIRE

    Nikos G. Moraitakis; Jiazhen Huo; Hans-Christian Pfohl

    2017-01-01

    Background: From a supply chain perspective, often big differences exist between global raw material suppliers’ approaches to supply their respective local markets. The progressing complexity of large centrally managed global supply networks and their often-unknown upstream ramifications increase the likelihood of undetected bottlenecks and inefficiencies. It is therefore necessary to develop an approach to strategically master the upstream complexity of such networks from a holistic su...

  11. How current are EURATOM provisions on nuclear supply and ownership in view of the European Union's enlargement?

    International Nuclear Information System (INIS)

    Bouquet, A.

    2001-01-01

    This contribution is mainly based on two papers presented at nuclear law conferences in 1998 and 2001, respectively setting out the special provisions governing supplies of nuclear fuels to the European Union (Chapter 6 of the Treaty establishing the European Atomic Energy Community, hereinafter referred to as the 'Euratom Treaty') and the right of ownership of the Euratom Community (Chapter 8 of the Euratom Treaty). These special Treaty provisions cannot be compared to anything observed in other legal systems. Hence, with their introduction into the legal systems of the new European Union member states, the question arises as to how current these provisions are and how they have been implemented in practice. Two of the fundamental objectives of the Euratom Treaty most relevant in this field are to ensure that all users in the Community receive a regular and equitable supply of ores and nuclear fuels (Article 2d Euratom) and to exercise the Community's right of ownership with respect to special fissile materials (Article 2f Euratom). Furthermore, the objectives of ensuring the establishment of the basic installations necessary for the development of nuclear energy in the Community (Article 2c Euratom), of safeguarding that material is not diverted from its intended use (Article 2e Euratom), of establishing a common market (Article 2g Euratom) and of maintaining external relations (Article 2h Euratom) can be relevant to nuclear trade and to the Supply Agency's action. The Treaty's philosophy with regard to supply and ownership is the result of a delicate compromise between public authority interventionism and a more free market approach. The interventionism resulted in a monopolistic system of supplies (exclusive right to conclude contracts, right of option, public authority ownership), whereas the free market approach brought about the commercial organisation of the entity responsible for the implementation of supply provisions (separate legal entity, market

  12. Custom 3D Printers Revolutionize Space Supply Chain

    Science.gov (United States)

    2015-01-01

    Under a series of SBIR contracts with Marshall Space Flight Center, start-up company Made In Space, located on the center's campus, developed a high-precision 3D printer capable of manufacturing items in microgravity. The company will soon have a printer installed on the International Space Station, altering the space supply chain. It will print supplies and tools for NASA, as well as nanosatellite shells and other items for public and private entities.

  13. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  14. Supply chain reliability modelling

    Directory of Open Access Journals (Sweden)

    Eugen Zaitsev

    2012-03-01

    Full Text Available Background: Today it is virtually impossible to operate alone on the international level in the logistics business. This promotes the establishment and development of new integrated business entities - logistic operators. However, such cooperation within a supply chain creates also many problems related to the supply chain reliability as well as the optimization of the supplies planning. The aim of this paper was to develop and formulate the mathematical model and algorithms to find the optimum plan of supplies by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Methods: The mathematical model and algorithms to find the optimum plan of supplies were developed and formulated by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Results and conclusions: The problem of ensuring failure-free performance of goods supply channel analyzed in the paper is characteristic of distributed network systems that make active use of business process outsourcing technologies. The complex planning problem occurring in such systems that requires taking into account the consumer's requirements for failure-free performance in terms of supply volumes and correctness can be reduced to a relatively simple linear programming problem through logical analysis of the structures. The sequence of the operations, which should be taken into account during the process of the supply planning with the supplier's functional reliability, was presented.

  15. Gas turbine installations in nuclear power plants in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Sevestedt, Lars [Electrical Equipment and Gas Turbines, Swedish State Power Board, Ringhals Nuclear Power Plant, S-430 22 Vaeroebacka (Sweden)

    1986-02-15

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  16. Gas turbine installations in nuclear power plants in Sweden

    International Nuclear Information System (INIS)

    Sevestedt, Lars

    1986-01-01

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  17. Supply Chain Management og Supply Chain costing

    DEFF Research Database (Denmark)

    Nielsen, Steen; Mortensen, Ole

    2002-01-01

    Formålet med denne artikel er at belyse de muligheder som ligger i at integrere virksomhedens økonomiske styring med begrebet Supply Chain Management (SCM). Dette søges belyst ved først at beskrive den teoretiske ramme, hvori SCM indgår. Herefter analyseres begrebet Supply Chain Costing (SCC) som...... Århus. Et resultat er, at via begrebet Supply Chain Costing skabes der mulighed for at måle logistikkædens aktiviteter i kr./øre. Anvendelsen af denne information har også strategisk betydning for at kunne vælge kunde og leverandør. Ved hjælp af integrationen skabes der også helt nye mulighed...

  18. Statement on incidents at nuclear installations - second quarter 1987

    International Nuclear Information System (INIS)

    1988-01-01

    The first incident reported occurred at the Sellafield reprocessing plant when a process worker was contaminated on the right knee of his overalls and received a skin dose in excess of the annual dose limit. Following an inquiry, he was allowed to return to normal working within 3 months. The second incident occurred at the Oldbury nuclear power station when reaction-1 tripped following the failure of one of the three phases of the electricity supply to part of the instrumentation. This caused a loss of forced coolant circulating for a short time following the reactor shutdown. However, following safety checks it was allowed to return to power. Improvements in the instrument supply system protection were subsequently installed on reactor-2 and will be, when possible, on reactor-1. (UK)

  19. Editorial: Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Dimitrios Aidonis

    2017-05-01

    Full Text Available This special issue has followed up the 3rd Olympus International Conference on Supply Chains held on Athens Metropolitan Expo, November 7 & 8 2015, Greece. The Conference was organized by the Department of Logistics Technological Educational Institute of Central Macedonia, in collaboration with the: a Laboratory of Quantitative Analysis, Logistics and Supply Chain Management of the Department of Mechanical Engineering, Aristotle University of Thessaloniki (AUTH, b Greek Association of Supply Chain Management (EEL of Northern Greece and the c Supply Chain & Logistics Journal. During the 2-Days Conference more than 60 research papers were presented covering the following thematic areas: (i Transportation, (ii Best Practices in Logistics, (iii Information and Communication Technologies in Supply Chain Management, (iv Food Logistics, (v New Trends in Business Logistics, and (vi Green Supply Chain Management. Three keynote invited speakers addressed interesting issues for the Operational Research, the Opportunities and Prospects of Greek Ports chaired Round Tables with other Greek and Foreign Scientists and Specialists.

  20. Sustainable Supply Chain Design

    DEFF Research Database (Denmark)

    Bals, Lydia; Tate, Wendy

    A significant conceptual and practical challenge is how to integrate triple bottom line (TBL; including economic, social and environmental) sustainability into global supply chains. Although this integration is necessary to slow down global resource depletion, understanding is limited of how...... to implement TBL goals across the supply chain. In supply chain design, the classic economic perspective still dominates, although the idea of the TBL is more widely disseminated. The purpose of this research is to add to the sustainable supply chain management literature (SSCM) research agenda...... by incorporating the physical chain, and the (information and financial) support chains into supply chain design. This manuscript tackles issues of what the chains are designed for and how they are designed structurally. Four sustainable businesses are used as illustrative case examples of innovative supply chain...

  1. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  2. Design and installation of a ferromagnetic wall in tokamak geometry

    International Nuclear Information System (INIS)

    Hughes, P. E.; Levesque, J. P.; Rivera, N.; Mauel, M. E.; Navratil, G. A.

    2015-01-01

    Low-activation ferritic steels are leading material candidates for use in next-generation fusion development experiments such as a prospective component test facility and DEMO power reactor. Understanding the interaction of plasmas with a ferromagnetic wall will provide crucial physics for these facilities. In order to study ferromagnetic effects in toroidal geometry, a ferritic wall upgrade was designed and installed in the High Beta Tokamak–Extended Pulse (HBT-EP). Several material options were investigated based on conductivity, magnetic permeability, vacuum compatibility, and other criteria, and the material of choice (high-cobalt steel) is characterized. Installation was accomplished quickly, with minimal impact on existing diagnostics and overall machine performance, and initial results demonstrate the effects of the ferritic wall on plasma stability

  3. Design and installation of a ferromagnetic wall in tokamak geometry

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P. E., E-mail: peh2109@columbia.edu; Levesque, J. P.; Rivera, N.; Mauel, M. E.; Navratil, G. A. [Columbia University Plasma Physics Laboratory, Columbia University, 102 S.W. Mudd, 500 W. 120th St., New York, New York 10027 (United States)

    2015-10-15

    Low-activation ferritic steels are leading material candidates for use in next-generation fusion development experiments such as a prospective component test facility and DEMO power reactor. Understanding the interaction of plasmas with a ferromagnetic wall will provide crucial physics for these facilities. In order to study ferromagnetic effects in toroidal geometry, a ferritic wall upgrade was designed and installed in the High Beta Tokamak–Extended Pulse (HBT-EP). Several material options were investigated based on conductivity, magnetic permeability, vacuum compatibility, and other criteria, and the material of choice (high-cobalt steel) is characterized. Installation was accomplished quickly, with minimal impact on existing diagnostics and overall machine performance, and initial results demonstrate the effects of the ferritic wall on plasma stability.

  4. Assessment of safety of the nuclear installations of the world

    International Nuclear Information System (INIS)

    Thomas, B.A.; Pozniakov, N.; Banga, U.

    1992-01-01

    Incidents and accidents periodically remind us that preventive measures at nuclear installations are not fully reliable. Although sound design is widely recognized to be prerequisite for safe operation, it is not sufficient. An active management that compensates for the weak aspects of the installations design by redundant operational provisions, is the key factor to ensure safe operation. Safety of nuclear installations cannot be assessed on an emotional basis. Since 1986, accurate safety assessment techniques based on an integrated approach to operational safety have been made available by the ASSET services and are applicable to any industrial process dealing with nuclear materials. The ASSET methodology enables to eliminate in advance the Root Causes of the future accidents by introducing practical safety culture principles in the current managerial practices

  5. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  6. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  7. Sustainable land use and renewable materials. Options for sustainable land use and resource protection strategies considering in particular a sustainable supply with renewable raw materials; Nachhaltige Flaechennutzung und nachwachsende Rohstoffe. Optionen einer nachhaltigen Flaechennutzung und Ressourcenschutzstrategien unter besonderer Beruecksichtigung der nachhaltigen Versorgung mit nachwachsenden Rohstoffen

    Energy Technology Data Exchange (ETDEWEB)

    Bringezu, Stefan; Schuetz, Helmut; Schepelmann, Philipp [Wuppertal Inst. fuer Klima, Umwelt, Energie (DE). Forschungsgruppe 3: Stoffstroeme und Ressourcenmanagement] (and others)

    2009-10-15

    This report highlights perspectives and options for action in order to promote sustainable land use considering resource of protection and supply with renewable raw materials. Land use within Germany is described as well as the global land use Germany based on its domestic consumption of products from agriculture and forestry. In terms of sustainable development, a long-lasting environmentally sound land use must be enabled which supports the required supply of renewable raw materials for energetic and non-energetic use while not endangering the future food supply of the growing world population. The Wuppertal Institute for Climate, Environment and Energy (WI), together with the Fraunhofer Institute for Environmental, Safety and Energy Technology (UMSICHT) in Oberhausen and the Institute for Energy and Environmental Research Heidelberg (IFEU), have for the first time with this study performed a comprehensive global land use balance for the consumption of food and non-food biomass in Germany, and have calculated in particular those greenhouse gas emissions which result from land use changes. In order not to endanger the climate and resource policy targets of the German government corrective measures for the implementation of policy targets for biomass use are needed. Existing targets for envisaged, enacted and promoted use of energy plants and biofuels should be reviewed. Existing legal biofuel quotas should by no means be increased. Furthermore, the national biofuels target for 2020 of a 12- 15% biofuels share of fuel consumption should be withdrawn, especially as this would send a clear international message. Such a target in the future would only be justifiable if the total amount of fuel consumed would decrease drastically (i.e. by more than half) as compared with today. Thereby the respective amount of biofuels required in the future would also decrease. The bonus for renewable raw materials of the Renewable Energy Sources Act (EEG) should be critically

  8. Switzerland's electricity supply industry

    International Nuclear Information System (INIS)

    Inwyler, Ch.

    1980-01-01

    After a short description of Switzerland's electricity supply industry, the author comments on the production and consumption of electrical energy as well as on Switzerland's role within the European grid. A brief survey of electricity supply as a service is followed by a discussion of the political tools (such as e.g. the referendum, the hearing procedure etc.), which are an essential clue for understanding the position of the electricity supply industry in Switzerland. (Auth.)

  9. Perspectives of electricity supply

    International Nuclear Information System (INIS)

    1988-01-01

    The 7 papers read at the symposium discussed the following subjects: Effects of the CO 2 problems of fossil energy systems on the world climate; status and perspectives of the German electricity industry in terms of competitiveness; The European electricity market and the integrated power supply system; Power supply without nuclear power; Costs and rates for households and other customers; Renewable energy sources and their contribution to energy supply in the Federal Republic of Germany; Electricity utilities as service partners. (UA) [de

  10. Supply chain components

    OpenAIRE

    Vieraşu, T.; Bălăşescu, M.

    2011-01-01

    In this article I will go through three main logistics components, which are represented by: transportation, inventory and facilities, and the three secondary logistical components: information, production location, price and how they determine performance of any supply chain. I will discuss then how these components are used in the design, planning and operation of a supply chain. I will also talk about some obstacles a supply chain manager may encounter.

  11. Supply chain components

    Directory of Open Access Journals (Sweden)

    Vieraşu, T.

    2011-01-01

    Full Text Available In this article I will go through three main logistics components, which are represented by: transportation, inventory and facilities, and the three secondary logistical components: information, production location, price and how they determine performance of any supply chain. I will discuss then how these components are used in the design, planning and operation of a supply chain. I will also talk about some obstacles a supply chain manager may encounter.

  12. D. C. power supply

    Energy Technology Data Exchange (ETDEWEB)

    Ohashi, N. Watanabe, Y.; Kitani, M

    1978-04-01

    DC power supplies are for ordinary and emergency use as power sources for various structures such as office buildings, department stores, hotels, and for facilities such as roads, tunnels, dams, power stations, etc. There is strong demand for these dc power supplies to be safe, automated, and maintenance free, and to have high reliability. A dc power supply which meets these demands is described; electric circuit construction is emphasized. (10 figures, 4 tables)

  13. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  14. Supply chain planning with sustainability considerations: an integrative framework

    DEFF Research Database (Denmark)

    Wang, Yang; Akkerman, Renzo; Birkved, Morten

    2011-01-01

    This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from sustai...... produced on industrial scale, studying several important planning decisions like temperature treatments and choice of packaging materials.......This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from...

  15. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  16. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  17. Qualtiy Issues in Project configured Supply Chains

    DEFF Research Database (Denmark)

    Koch, Christian; Larsen, Casper Schultz

    by configuration by project. In such a setting creating value for the customers and the enterprises becomes dependent of the ability to organise and coordinate in the supply chains. That the configuration is not always successful can be demonstrated by studying the emergence of failures occurring in the supply...... observation period. These were compiled and analysed. The economic consequences are calculated to be 8% of the production costs. The analysis of relations in the supply chain both show relations to materials and knowledge chains and their interaction. Most of the failures were generated in the knowledge...... stream and then occasionally transform into the material stream. The paper proposes initiatives to strengthen partnerships in supply chains and especially at engineer to order production. The contradiction between the permanent enterprise organisation potentially capable of handling purchasing...

  18. Nuclear Fuel Supply Arrangements through the IAEA

    International Nuclear Information System (INIS)

    Phuong, Ha-Vinh

    1981-10-01

    By virtue of its statutory functions, the International Atomic Energy Agency may be the depositary and also the supplier of nuclear materials made available to it by Member States, and these may then be stored in facilities it has acquired or which it has established under its control. However, this possibility did not materialize, mainly because the supplying states -few in number- do not want an international organization to become directly involved in bilateral transactions in that field. This paper analyses in particular the provisions of supply agreements concluded with the United Kingdom, the USA and the USSR. The Annex contains a Table of Agreements on supply of nuclear fuel and equipment concluded between supplying and consumer states through the IAEA. (NEA) [fr

  19. Alternative energy supply system to a rural village in Ethiopia

    NARCIS (Netherlands)

    Tucho, Gudina; Nonhebel, Sanderine

    2017-01-01

    Background Most households in rural developing countries do not have access to modern energy supply. Household level biogas energy was considered as an option but failed due to lack of sufficient resources for its installation and operation. A community energy system can be an option, but most

  20. Speaker's presentations. Energy supply security

    International Nuclear Information System (INIS)

    Pierret, Ch.

    2000-01-01

    This document is a collection of most of the papers used by the speakers of the European Seminar on Energy Supply Security organised in Paris (at the French Ministry of Economy, Finance and Industry) on 24 November 2000 by the General Direction of Energy and Raw Materials, in co-operation with the European Commission and the French Planning Office. About 250 attendees were present, including a lot of high level Civil Servants from the 15 European State members, and their questions have allowed to create a rich debate. It took place five days before the publication, on 29 November 2000, by the European Commission, of the Green Paper 'Towards a European Strategy for the Security of Energy Supply'. This French initiative, which took place within the framework of the European Presidency of the European Union, during the second half-year 2000. will bring a first impetus to the brainstorming launched by the Commission. (author)