  1. TWRS Privatization Phase 1 Master Site Plan

    International Nuclear Information System (INIS)

    PARAZIN, R.J.

    1999-01-01

    The U.S. Department of Energy (DOE) has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two privatization phases. Phase I, a 'proof of concept' phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary far privatization to proceed. Once established, privatization will be expanded in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. In conjunction with preparation of the Tank Waste Remediation System (TWRS) Privatization Request for Proposals (RFP)(RL, 1996), a location was selected for the Phase I demonstration facilities (Shord, 1996). The location selected was the area previously developed and characterized for the Grout Disposal Site, adjoining the 200 East Area. The site is of sufficient size for a Private Contractor (PC) to carry out pretreatment, immobilization, and vitrification operations and possesses the required characteristics (e.g., close to feed tanks) to best facilitate the Phase I operations. This overall long-range Master Site Plan (MSP) has been developed to establish a ''baseline'' for the (TWRS) Privatization Phase I (TPPI) PC Site. The MSP depicts the planned layout for the PC Site along with various interfaces between the site and other Hanford utilities and functions. The complete integration of TPPl MSP with overall Hanford Site planning process will assist in establishing the PC site and the necessary priorities to meet the Hanford cleanup mission. The MSP has been developed systematically into a comprehensive, safe, flexible, logical and cost-effective plan. The general philosophy behind the preparation of a MSP for the TPPl program is that it will serve as a single source documentation of the planning for the development of the TPPl complex. The effort will plan temporary and permanent land use, utilities, and traffic flow for the overall program. It will identify needs

  2. Site 300 City Water Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Jeff [Stantec Consulting Services Inc., Irvine, CA (United States)

    2017-03-13

    Lawrence Livermore National Laboratory (LLNL), a scientific research facility, operates an experimental test site known as Site 300. The site is located in a remote area of southeastern Alameda County, California, and consists of about 100 facilities spread across 7,000-acres. The Site 300 water system includes groundwater wells and a system of storage tanks, booster pumps, and underground piping to distribute water to buildings and significant areas throughout the site. Site 300, which is classified as a non-transient non-community (NTNC) water system, serves approximately 110 employees through 109 service connections. The distribution system includes approximately 76,500-feet of water mains varying from 4- to 10-inches in diameter, mostly asbestos cement (AC) pipe, and eleven water storage tanks. The water system is divided into four pressure zones fed by three booster pump stations to tanks in each zone.

  3. Interior design. Mastering the master plan.

    Science.gov (United States)

    Mesbah, C E

    1995-10-01

    Reflecting on the results of the survey, this proposed interior design master planning process addresses the concerns and issues of both CEOs and facility managers in ways that focus on problem-solving strategies and methods. Use of the interior design master plan process further promotes the goals and outcomes expressed in the survey by both groups. These include enhanced facility image, the efficient selection of finishes and furnishings, continuity despite staff changes, and overall savings in both costs and time. The interior design master plan allows administrators and facility managers to anticipate changes resulting from the restructuring of health care delivery. The administrators and facility managers are then able to respond in ways that manage those changes in the flexible and cost-effective manner they are striving for. This framework permits staff members to concentrate their time and energy on the care of their patients--which is, after all, what it's all about.

  4. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  5. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  6. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  7. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  8. A master plan for the radwaste management

    International Nuclear Information System (INIS)

    Kim, Y.E.; Lee, S.H.; Lee, C.K.; Moon, S.H.; Sung, R.J.; Sung, K.W.

    1983-01-01

    The accumulated total amount of low-level radioactive wastes to be produced from operating power reactors and nuclear installations up until the year 2007 is estimated to 900,000 drum(approximately 200,000M 3 ). An effective master plan for the safe disposal of the wastes is necessary. Among many different disposal methods available for low-and medium-level radwastes, the engineered trench approach was chosen by an extensive feasibility study as the optimum method for Korea. Site selection, construction and commissioning of such a disposal facility are presumed to take two and a half years, beginning in July 1983. The total cost in opening the site and the unit disposal cost per drum were estimated to be 11 billion won and 40,000 won, respectively. An agency(KORDA) managing the operation of the disposal site is recommended to be established by 1987, assuming that the agency's economic feasibility can be justified by that time. When the disposal site is commissioned, a regulatory guide for ground disposal will be available, and supporting R and D work on the disposal site will be complete. Studies on the technology of radwaste treatment will continue through this period. For the longer term, staff training and future planning have been undertaken to ensure that a master plan, which can be expected to be used as a guideline for disposal of all radioactive waste arising, is fully adequate. (Author)

  9. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  10. United States Shipbuilding Standards Master Plan

    National Research Council Canada - National Science Library

    Horsmon, Jr, Albert W

    1992-01-01

    This Shipbuilding Standards Master Plan was developed using extensive surveys, interviews, and an iterative editing process to include the views and opinions of key persons and organizations involved...

  11. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  12. AUA Program Master Plan. Volume 1: Overview

    Science.gov (United States)

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  13. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  14. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  15. Colorado Academic Library Master Plan, Spring 1982.

    Science.gov (United States)

    Breivik, Patricia Senn; And Others

    Based on a need to assess current library strengths and weaknesses and to project potential library roles in supporting higher education, this master plan makes a series of recommendations to Colorado's academic libraries. It is noted that the plan was endorsed by both the Colorado Commission on Higher Education and the Colorado State Department…

  16. Structural master plan of flood mitigation measures

    OpenAIRE

    A. Heidari

    2009-01-01

    Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possi...

  17. Coho Salmon Master Plan, Clearwater River Basin.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe; FishPro

    2004-10-01

    uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation

  18. APPLICATION OF SUSTAINABILITY CRITERIA TO STELLA, MISSOURI-ECONOMIC PLANNING-PRELIMINARY SITE INFORMATION AND ELEMENTS OF THE MASTER PLAN-16NOV2006 (1130)

    Science.gov (United States)

    Economic systems constraints and performance requirements that are essential to providing goods and services, jobs, and a functioning economic system form a list of criteria for planning a sustainable economy. This presentation places these economic criteria in the context of Ste...

  19. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    conjunct ion with a modified Lookingglass Hatchery. Each alternative was evaluated based on criteria developed for rearing fish for a conservation program. After this review, the Nez Perce Tribe determined the only alternative that meets the needs of the program is the alternative to use new facilities in conjunction with a modified Lookingglass Hatchery. This is the Proposed Alternative. The Proposed Alternative would require: Construction of a new incubation and rearing facility in the Imnaha River and modifications of the existing Gumboot facility to accommodate the Imnaha component of the Lookingglass Hatchery production; Construction of a new incubation and rearing facility in the Lostine River to accommodate the Lostine component of the Lookingglass Hatchery production; and Modifications at Lookingglass Hatchery to accommodate the Upper Grande Ronde and Catherine Creek components of the Lookingglass Hatchery production. After an extensive screening process of potential sites, the Nez Perce Tribe proposes the Marks Ranch site on the Imnaha River and the Lundquist site on the Lostine River for new facilities. Conceptual design and cost estimates of the proposed facilities are contained in this master plan. The proposed facilities on the Imnaha and Lostine rivers would be managed in conjunction with the existing adult collection and juvenile acclimation/release facilities. Because this master plan has evolved into an endeavor undertaken primarily by the Nez Perce Tribe, the focus of the document is on actions within the Imnaha and Lostine watersheds where the Nez Perce Tribe have specific co-management responsibilities. Nevertheless, modifications at Lookingglass Hatchery could make it possible to provide a quality rearing environment for the remainder of the CPP. The Nez Perce Tribe will assist co-managers in further evaluating facility needs and providing other components of the NPPC master planning process to develop a solution for the entire CPP. Although the fish

  20. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  1. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  2. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  3. Radiotherapy facilities: Master planning and concept design considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals.

  4. Radiotherapy Facilities: Master Planning and Concept Design Considerations (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology and a typical project work plan, and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  5. Radiotherapy facilities: Master planning and concept design considerations

    International Nuclear Information System (INIS)

    2014-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  6. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    the issues specific to the later assessment (ETL 1110-3-407, pp 1-9 to 1-10). Under the : estructured master planning process discussed in this report...Lisa~m 0111utHars M143 AMW PRO*b LAMM~e 0)3. AMW uaides, Uso ~ow (M Port RJ." 21719 7%s pubhicaton was repfodaaced on moycled V&Mp. /| / 121 DATEI:

  7. Structural master plan of flood mitigation measures

    Directory of Open Access Journals (Sweden)

    A. Heidari

    2009-01-01

    Full Text Available Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possibility of flood overtopping. Different flood mitigation alternatives are investigated from various aspects in the Dez and Karun river floodplain areas as a case study in south west of IRAN. The results show that detention dam and flood diversion are the best alternatives of flood mitigation methods as well as enforcing the flood control purpose of upstream multipurpose reservoirs. Dyke and levees are not mostly justifiable because of negative impact on down stream by enhancing routed flood peak discharge magnitude and flood damages as well.

  8. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  9. Double Star project - master science operations plan

    Science.gov (United States)

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  10. Double Star project - master science operations plan

    Directory of Open Access Journals (Sweden)

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  11. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  12. Remote Excavation of Heavily Contaminated UXO Sites. The Range Master

    National Research Council Canada - National Science Library

    Crandall, Alan L

    2007-01-01

    USA Environmental, Inc., and Timberline Environmental Services, Inc., developed the Range Master, a remote controlled scraper with an integrated power screen, to excavate and sift the top 12 inches of heavily contaminated UXO sites...

  13. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  14. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  15. Developing Scientific Index System of Urban Master Planning

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>Master plan is the fundamental basis for urban construction and administration, an important public policy of the govern-ments, as well as an overall, comprehen-sive, and strategic task related to politics, economy,

  16. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  17. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  18. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  19. Succession, Development and Innovation of the Master Plan of Beijing

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    <正> The Master Plan of Beijing (2004 - 2020),approved in January 2005 by the State Council, is an important strategic, holistic and comprehensive plan for Beijing to face the new century, to realize the stra-tegic proposition of"New Beijing, Great Olympics", and to fully push forward the harmonious and sustainable development of economy, society, population, resources and environment.

  20. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  1. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  2. Site 300 SPCC Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-23

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  3. Master plans for pedestrian and bicycle transportation: community characteristics.

    Science.gov (United States)

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  4. Housing, health and master planning: rules of engagement.

    Science.gov (United States)

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  5. Hanford Site Infrastructure Plan

    International Nuclear Information System (INIS)

    1990-01-01

    The Hanford Site Infrastructure Plan (HIP) has been prepared as an overview of the facilities, utilities, systems, and services that support all activities on the Hanford Site. Its purpose is three-fold: to examine in detail the existing condition of the Hanford Site's aging utility systems, transportation systems, Site services and general-purpose facilities; to evaluate the ability of these systems to meet present and forecasted Site missions; to identify maintenance and upgrade projects necessary to ensure continued safe and cost-effective support to Hanford Site programs well into the twenty-first century. The HIP is intended to be a dynamic document that will be updated accordingly as Site activities, conditions, and requirements change. 35 figs., 25 tabs

  6. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  7. Perancangan Master Plan Sistem Informasi Akademik STT Dharma Iswara Madiun

    Directory of Open Access Journals (Sweden)

    Hani Atun Mumtahana

    2016-12-01

    Full Text Available Teknologi Informasi dan Sistem Informasi sudah menjadi hal paling mendasar dalam suatu organisasi dalam menjalankan proses bisnis. Perkembangan Teknologi Informasi dan Sistem Informasi (TI/SI yang baik harus direncanakan dengan baik. Master Plan merupakan suatu pedoman jangka pendek, menengah dan jangka panjang dalam pengembangan TI/SI suatu organisasi/perusahaan. Dalam menjalankan proses bisnis yang disesuaikan dengan Visi, Misi dan Tujuannya, STT Dharma Iswara Madiun lebih menitik beratkan pada Pelayanan Bidang Akademik (disesuaikan dengan gambaran Portofolio Aplikasi. Untuk menghasilkan pelayanan yang prima dalam bidang Akademik, perancangan Master Plan Sistem Informasi Akademik merupakan salah satu cara untuk membuat perencanaan jangka panjang pemeliharaan Sistem Informasi Akademik. Pada penelitian ini perancangan Master Plan Sistem Informasi Akademik dilakukan dengan perumusan Rencana Strategis STT Dharma Iswara Madiun, membuat arsitektur Sistem Informasi dengan framework Zachman 4 kolom (data (what, function (how, network (where dan people (who dan 3 baris (planner, owner dan designer. Hasil penelitian ini berupa rencana pengembangan Sistem Infromasi Akademik dalam bentuk Master Plan pada jangka pendek, jangka menengah dan jangka panjang.

  8. Master planning for successful safeguard/security systems engineering

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1987-01-01

    The development and phased implementation of an overall master plan for weapons systems and facilities engaged in the complexities of high technology provides a logical road map for system accomplishment. An essential factor in such a comprehensive plan is development of an integrated systems security engineering plan. Some DOD programs use new military regulations and policy directives to mandate consideration of the safeguard/security disciplines be considered for weapons systems and facilities during the entire life cycle of the program. The emphasis is to make certain the weapon system and applicable facilities have complementary security features. Together they must meet the needs of the operational mission and, at the same time, provide the security forces practical solutions to their requirements. This paper discusses the process of meshing the safe- guards/security requirements with an overall the master plan and the challenges attendant to this activity

  9. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  10. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  11. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  12. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  13. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  14. Master plan of Mizunami underground research laboratory

    International Nuclear Information System (INIS)

    1999-04-01

    In June 1994, the Atomic Energy Commission of Japan reformulated the Long-Term Programme for Research, Development and Utilisation of Nuclear Energy (LTP). The LTP (item 7, chapter 3) sets out the guidelines which apply to promoting scientific studies of the deep geological environment, with a view to providing a sound basis for research and development programmes for geological disposal projects. The Japan Nuclear Cycle Development Institute (JNC) has been conducting scientific studies of the deep geological environment as part of its Geoscientific Research Programme. The LTP also emphasised the importance of deep underground research facilities in the following terms: Deep underground research facilities play an important role in research relating to geological disposal. They allow the characteristics and features of the geological environment, which require to be considered in performance assessment of disposal systems, to be investigated in situ and the reliability of the models used for evaluating system performance to be developed and refined. They also provide opportunities for carrying out comprehensive research that will contribute to an improved overall understanding of Japan's deep geological environment. It is recommended that more than one facility should be constructed, considering the range of characteristics and features of Japan's geology and other relevant factors. It is important to plan underground research facilities on the basis of results obtained from research and development work already carried out, particularly the results of scientific studies of the deep geological environment. Such a plan for underground research facilities should be clearly separated from the development of an actual repository. JNC's Mizunami underground research laboratory (MIU) Project will be a deep underground research facility as foreseen by the above provisions of the LTP. (author)

  15. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Science.gov (United States)

    Jenna H. Tilt; Lee. Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  16. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  17. Louisiana's 2017 Master Plan for a Sustainable Coast

    Science.gov (United States)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  18. Methodical approaches in the Norwegian Master Plan for Water Resources

    International Nuclear Information System (INIS)

    Bowitz, Einar

    1997-01-01

    The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs

  19. Mastering Search Analytics Measuring SEO, SEM and Site Search

    CERN Document Server

    Chaters, Brent

    2011-01-01

    Many companies still approach Search Engine Optimization (SEO) and paid search as separate initiatives. This in-depth guide shows you how to use these programs as part of a comprehensive strategy-not just to improve your site's search rankings, but to attract the right people and increase your conversion rate. Learn how to measure, test, analyze, and interpret all of your search data with a wide array of analytic tools. Gain the knowledge you need to determine the strategy's return on investment. Ideal for search specialists, webmasters, and search marketing managers, Mastering Search Analyt

  20. Path planning of master-slave manipulator using graphic simulator

    International Nuclear Information System (INIS)

    Lee, J. Y.; Kim, S. H.; Song, T. K.; Park, B. S.; Yoon, J. S.

    2002-01-01

    To handle the high level radioactive materials such as spent fuels remotely, the master-slave manipulator is generally used as a remote handling equipment in the hot cell. To analyze the motion and to implement the training system by virtual reality technology, the simulator for M-S manipulator using the computer graphics is developed. The parts are modelled in 3-D graphics, assembled, and kinematics are assigned. The inverse kinematics of the manipulator is defined, and the slave of manipulator is coupled with master by the manipulator's specification. Also, the virtual work cell is implemented in the graphical environment which is the same as the real environment and the path planning method using the function of the collision detection for a manipulator are proposed. This graphic simulator of manipulator can be effectively used in designing of the maintenance processes for the hot cell equipment and enhance the reliability of the spent fuel management

  1. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  2. Development of a master plan for industrial solid waste management

    International Nuclear Information System (INIS)

    Karamouz, M.; Zahraie, B.; Kerachian, R.; Mahjouri, N.; Moridi, A.

    2006-01-01

    Rapid industrial growth in the province of Khuzestan in the south west of Iran has resulted in disposal of about 1750 tons of solid waste per day. Most of these industrial solid wastes including hazardous wastes are disposed without considering environmental issues. This has contributed considerably to the pollution of the environment. This paper introduces a framework in which to develop a master plan for industrial solid waste management. There are usually different criteria for evaluating the existing solid waste pollution loads and how effective the management schemes are. A multiple criteria decision making technique, namely Analytical Hierarchy Process, is used for ranking the industrial units based on their share in solid waste related environmental pollution and determining the share of each unit in total solid waste pollution load. In this framework, a comprehensive set of direct, indirect, and supporting projects are proposed for solid waste pollution control. The proposed framework is applied for industrial solid waste management in the province of Khuzestan in Iran and a databank including GIS based maps of the study area is also developed. The results have shown that the industries located near the capital city of the province, Ahwaz, produce more than 32 percent of the total solid waste pollution load of the province. Application of the methodology also has shown that it can be effectively used for development of the master plan and management of industrial solid wastes

  3. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  4. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  5. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    Science.gov (United States)

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  6. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  7. Are master plans effective in limiting development in China's disaster-prone areas?

    OpenAIRE

    Kim, Saehoon; Rowe, Peter G.

    2013-01-01

    The effectiveness of urban master plans in limiting development in a disaster-prone area of China was empirically investigated by measuring cities’ land-cover changes against their master plans. If a master plan serves as guidance for urban polices that reduce property loss from earthquakes, floods, landslides,land subsidence, and rises in sea level, it will substantially limit urban development in areas at risk from environmental hazards. An environmental risk map weighted toward valuable...

  8. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  9. Site decommissioning management plan

    International Nuclear Information System (INIS)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff's strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites

  10. Site decommissioning management plan

    Energy Technology Data Exchange (ETDEWEB)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  11. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.

    Science.gov (United States)

    2012-06-01

    Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...

  12. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  13. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    International Nuclear Information System (INIS)

    De Montis, Andrea; Ledda, Antonio; Caschili, Simone; Ganciu, Amedeo; Barra, Mario

    2014-01-01

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aim of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring

  14. 77 FR 48550 - Technicolor Creative Services, Post Production Feature Mastering Division Including On-Site...

    Science.gov (United States)

    2012-08-14

    ... Services, Post Production Feature Mastering Division Including On-Site Leased Workers From Ajilon... Services, Post Production Feature Mastering Division, Hollywood, California (subject firm). The worker... the workers meet the eligibility requirements of the Trade Act of 1974. Conclusion After careful...

  15. Minimizing Lid Overstows in Master Stowage Plans for Container Vessels is NP-Complete

    DEFF Research Database (Denmark)

    Ajspur, Mai Lise; Jensen, Rune Møller; Guilbert, Nicolas

    Container vessel stowage is a particularly hard combinatorial problem within the shipping industry. The currently most successful approaches decompose the problem hierarchically and first generate a master plan that handle highlevel constraints and objectives such as balance and stress moments...... that it is an NP -complete problem to generate master plans that minimize the number of these lid overstows. Since any efficient approach to container vessel stowage most likely must include a master plan, the implication of this result is that future research must focus and developing good heuristics...

  16. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  17. Integral stormwater management master plan and design in an ecological community.

    Science.gov (United States)

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  18. Homeroom Activities in a College of Technology Based on the Master Plan

    Science.gov (United States)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  19. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  20. The Effect of Modeling Qualities, Tones and Gages in Ceramic Supply Chains' Master Planning

    Directory of Open Access Journals (Sweden)

    Isabel MUNDI

    2012-01-01

    Full Text Available Ceramic production processes are characterized by providing quantities of the same finished goods that differ in qualities, tones and gages. This aspect becomes a problem for ceramic supply chains (SCs that should promise and serve customer orders with homogeneous quantities of the same finished good. In this paper a mathematical programming model for the cen-tralized master planning of ceramic SC is proposed. Inputs to the master plan include demand forecasts in terms of customer order classes based on their order size and splitting percentages of a lot into homogeneous sub-lots. Then, the master plan defines the size and loading of lots to production lines and their distribution with the aim of maximizing the number of customer orders fulfilled with homogeneous quantities in the most efficient manner for the SC. Finally, the effect of modeling qualities, tones and gages in master planning is assessed.

  1. "Hospital Master Plan'ist" haiglavõrgu arengukavani / Tarmo Bakler

    Index Scriptorium Estoniae

    Bakler, Tarmo, 1970-

    2003-01-01

    Ülevaade, kuidas Hospital Master Planìs toodud põhimõtteid on kasutatud praeguseni elluviidud muutuste tegemisel ja kuidas on HMPd täiendatud Eesti Tervishoiuprojekt 2015 koostatud haiglavõrgu arengukavas 2002. Kaart. Tabelid

  2. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    Science.gov (United States)

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  3. Australia's master plan for uranium: questions still cloud the future

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    Although the Australian Government has given the long-awaited green light for mining and export of uranium, potential uranium producers will have to battle a welter of red tape before the production outlook from the 1980s on becomes clear. An extensive number of bureaucratic agencies must be established before site work can begin. However, it now seems reasonably certain that by the mid-1980s Australian uranium mines will be producing 10,000 to 15,000 mtpy of uranium oxide. After that, production should grow rapidly, given the government's optimism about longer term market prospects. In the months ahead the government will assess the levels of international demand to be expected in coming years and will plan production and sales to meet those needs. Uranium deposits developed so far are described briefly

  4. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, Charles G

    2012-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.

  5. On-site emergency planning

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture covers the Emergency Planning of the Operating organization and is based on the Code of Practice and Safety Guides of the IAEA as well as on arrangements in use at the Swiss Nuclear Power Station Beznau and - outlines the basis and content of an emergency plan - describes the emergencies postulated for emergency planning purposes - describes the responsibilities, the organization and the procedures of the operating organization to cope with emergency situations and the liaison between the operating organization, the regulatory body and public authorities - describes the facilities and equipment which should be available to cope with emergency sitauations - describes the measures and actions to be taken when an emergency arises in order to correct abnormal plant conditions and to protect the persons on-and off-site - describes the aid to be given to affected personnel - describes the aspects relevant to maintaining the emergency plan and organization in operational readiness. (orig./RW)

  6. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  7. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    Energy Technology Data Exchange (ETDEWEB)

    De Montis, Andrea, E-mail: andreadm@uniss.it [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Ledda, Antonio, E-mail: antonioledda@gmail.com [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Caschili, Simone, E-mail: s.caschili@ucl.ac.uk [UCL QASER Lab and Centre for Advanced Spatial Analysis, University College London, Gower Street, London WC1E 7HB (United Kingdom); Ganciu, Amedeo, E-mail: dott.amedeoganciu@gmail.com [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Barra, Mario, E-mail: barra@uniss.it [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy)

    2014-07-01

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aim of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.

  8. Network master planning for a global manufacturing company

    OpenAIRE

    Heinz, Michael Pierre

    2006-01-01

    Production in global, intra-organisational networks is becoming more common. In this context, the allocation of production quantities to constrained manufacturing capacity is a challenging process. Due to a volatile environment it is argued to be impossible to achieve a ‘clean’ system design with dedicated resources which exactly meets future demand. Thus, recursive ‘Network Master Planning’ (NMP) becomes necessary. The aim of this research is to generate an understanding of th...

  9. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  10. Ankara Historic City Centre Restoration Site Conservation Plan, its Characteristics, and Rationales for its Revocation

    Directory of Open Access Journals (Sweden)

    Mehmet Tuncer

    2013-12-01

    Full Text Available This is a comprehensive evaluation of the 1: 5000 Ankara Historic City Centre Restoration Site Conservation Master Development Plan and the 1: 1000 Conservation Implementation Plans, which have become a matter of litigation against the Ankara Metropolitan Municipality, filed by various non-governmental organizations, universities, the Union of Chambers of Turkish Architects and Engineers (TMMOB and public institutions; in terms of the environment, transportation and traffic as regards the entirety of the planned location, and the integrity of the plan, based on conservation-reclamation planning essentials and public interest. Thus the Ulus Ankara Historic City Centre Restoration Site Conservation Master Development and Implementation Plan and Plan Notes as ratified by the Ankara Metropolitan Municipality and Conservation Board, are examined in this context in terms of restoration site, protected site, conservation site, interaction and transition sites and historic and cultural properties.

  11. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  12. Master plan for remediation of the Sillamaee tailings pond and technical design project

    International Nuclear Information System (INIS)

    Kaasik, T.

    2000-01-01

    Remediation of the Sillamaee radioactive tailings pond is a priority in the Estonian National Environmental Plan. The Sillamaee plant has processed metal ores by hydrometallurgical methods since 1946. Processing continued until 1990, but in the 1970s, production of rare earths and rare metals was introduced and continues today at a smaller scale. The tailings pond contains residues from these operations. The environmental problems associated with the tailings pond are the stability of the dam and the release of contaminants. In order to deal with these two issues effectively, a master plan was drawn up. The master plan covers the period from 1997 to 2008 and was compiled with the cooperation of the Silmet Group and the Sillamaee International Expert Reference Group (SIERG). The master plan sets up a systematic approach for the overall tailings pond remediation, including drying its interior, reshaping and covering the surface, minimizing water flow through the tailings, and ensuring long-term dam stability

  13. A Case Study in Master Planning the Learning Landscape Hub Concepts for the University at Buffalo

    Science.gov (United States)

    Dugdale, Shirley; Torino, Roger; Felix, Elliot

    2009-01-01

    This case study describes concepts for three types of learning spaces that grew out of a Learning Landscape planning process. The process was part of a master plan study for the three campuses of the University at Buffalo. It involved research into user needs and aspirations about future pedagogy, development of learning space strategy,…

  14. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Erhart, Steven C. [National Nuclear Security Administration (NNSA), Washington, DC (United States); Spencer, Charles G. [Y-12 National Security Complex, Oak Ridge, TN (United States)

    2013-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  15. OPS Master

    Data.gov (United States)

    US Agency for International Development — OPS Master is a management tool and database for integrated financial planning and portfolio management in USAID Missions. Using OPS Master, the three principal...

  16. Off-site emergency planning

    International Nuclear Information System (INIS)

    Narrog, J.

    1980-01-01

    In the event of a nuclear accident, the actions taken to protect the public from off-site consequences must be effective. An effective organization of emergency actions is based on two components: the actions of the operator of the nuclear facility and the actions of the competent authorities. The measures of the operator are of special importance in the first hours after the beginning of the nuclear accident, because there is no other help. Therefore the operator of a nuclear facility shall be obliged under the nuclear licensing procedure to make provisions of his own and carry out protective measures which should be compiled in a so-called 'alarm-plan'. On the other hand the means of the operator are too small in many cases and there is a need for actions by the responsible authorities. The actions of the authorities should be compiled in a so-called 'emergency response plan'. The emergency response plan shall apply to all cases in which, as a result of occurrences in or at a nuclear facility, a damaging impact on the environment is expected or has occurred requiring the authorities in charge to intervene for its prevention or limitation. (orig./RW)

  17. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  18. Quality control of brachytherapy system module Oncentra MasterPlan V3.3 planning; Control de calidad del modulo de braquiterapia del sistema de planificacion Oncentra MasterPlan V3.3

    Energy Technology Data Exchange (ETDEWEB)

    Monja Ray, P. de la; Torres Pozas, S.; Sanchez Carrascal, M.; Macias Verde, D.; Martin Oliva, R.

    2011-07-01

    We present the results of quality control carried out the planning system (SP) MasterPlan Oncentra Brachy, version 3.3 (Nucletron), on the occasion of its launch, following the recommendations proposed in the Protocol for quality control in planning systems therapy with ionizing radiation [SEFM, published by the Spanish Society of Medical Physics (SEFM) in 2005].

  19. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sherry, T D; Kohlhorst, D P; Little, S K

    2011-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the DOE and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the Guiding Principles. Specifically, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP) while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. Table ES.2 gives a comprehensive overview of Y-12's performance status and planned actions. B&W Y-12's Energy Management mission is to incorporate renewable energy and energy efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. During FY 2011, the site formed a sustainability team (Fig. ES.1). The sustainability team provides a coordinated approach to meeting the various sustainability requirements and serves as a forum for increased communication and consistent implementation of sustainability activities at Y-12. The sustainability team serves as an information exchange mechanism to promote general awareness of sustainability information, while providing a system to document progress and to identify resources. These resources are necessary to implement activities that support the overall goals of sustainability, including reducing the use of resources and conserving energy. Additionally, the team's objectives include: (1) Foster a Y-12-wide philosophy to conserve resources; (2) Reduce the impacts of production operations in a cost-effective manner; (3) Increase materials recycling; (4) Use a minimum amount of energy and fuel; (5) Create a minimum of waste and pollution in achieving Y-12-strategic objectives; (6) Develop and implement techniques, technologies, process modifications, and programs that support sustainable acquisition; (7) Minimize the

  20. Arizona TeleMedicine Network: Engineering Master Plan.

    Science.gov (United States)

    Atlantic Research Corp., Alexandria, VA.

    As the planning document for establishing a statewide health communications system initially servicing the Papago, San Carlos and White Mountain Apache, Navajo, and Hopi reservations, this document prescribes the communications services to be provided by the Arizona TeleMedicine Network. Specifications include: (1) communications services for each…

  1. THE NIGERIAN GAS MASTER-PLAN, INVESTMENT OPPORTUNITIES, CHALLENGES, ISSUES AFFECTING POWER SECTOR: AN ANALYSIS

    Directory of Open Access Journals (Sweden)

    R. INGWE

    2014-11-01

    Full Text Available The Nigerian Gas Master-Plan, Investment Opportunities, Challenges, Issues Affecting Power Sector: an Analysis. The objective of this article is to contribute towards understanding of the Nigerian Gas Master Plan (NGMP/Plan and its bifurcations with key socio-economic development factors. I applied the method of discourse to bring to being some points that have hitherto been unknown about the Master-plan and its inter-relationships and bifurcations. Elaborated here are the spectacular gains that have accrued to the Latin American country, Trinidad and Tobago, from its recent development of natural gas resources. This was considered suitable and significant here for highlighting that if such spectacular achievements could be realized from Trinidad and Tobago’s relatively smaller gas deposit (15.3 tcf, probable reserves (8.4 tcf, possible reserves (6.2 tcf would be by far greater considering Nigeria’s larger natural gas reserves (184 tcf wealth as earlier stated. I show that the Plan is well designed relevant to addressing Nigeria’s current development needs generally. It presents potentials for stimulating Nigeria’s economic growth by harnessing the country’s abundant natural gas reserves. The Plan enumerates/ elaborates huge investment opportunities. Some challenges likely to be faced in the implementation/management of the Plan are already being surmounted as recent reports show that some of its key investments have been realized and the required infrastructure are being provided. Regarding the issues in the Master-plan that are likely to affect and are affecting Nigeria’s power sector development, I reckon that they are mostly positive factors due to the way the plan promises to stimulate electricity generation in our country.

  2. Logistics Automation Master Plan (LAMP). Better Logistics Support through Automation.

    Science.gov (United States)

    1983-06-01

    productivity and efficiency of DARCOM human resources through the design, development, and deployment of workspace automation tools. 16. Develop Area Oriented...See Resource Annex Budgeted and Programed Resources by FY: See Resource Annex Actual or Planned Source of Resources: See Resourece Annex. Purpose and...screen, video disc machine and a microcomputer. Pressure from a human hand or light per on the user friendly screen tells the computer to retrieve

  3. And the Sky Is Grey: The Ambivalent Outcomes of the California Master Plan for Higher Education

    Science.gov (United States)

    Marginson, Simon

    2018-01-01

    In the 1960 Master Plan for Higher Education, California in the United States famously combined the principles of excellence and access within a steep three-tiered system of Higher Education. It fashioned the world's strongest system of public research universities, while creating an open access system that brought college to millions of American…

  4. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  5. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  6. The Dutch Bicycle Master Plan and road safety : measures to be taken.

    NARCIS (Netherlands)

    Noordzij, P.C. & Blokpoel, A.

    1998-01-01

    The Bicycle Master Plan was launched in 1990 and concluded in 1996. To mark its conclusion, a study was carried out to assess developments in road safety for cyclists. An overview of future measures was also compiled. Since 1950, there have been three broad periods: (1) 1950-1975: an increase in the

  7. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    Science.gov (United States)

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  8. Master plan nurse duty roster using the 0-1 goal programming technique

    Science.gov (United States)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  9. Cooperative Path Planning and Constraints Analysis for Master-Slave Industrial Robots

    Directory of Open Access Journals (Sweden)

    Yahui Gan

    2012-09-01

    Full Text Available A strategy of cooperative path planning for a master-slave multiple robot system is presented in this paper. The path planning method is based on motion constraints between the end-effectors of cooperative robots. Cooperation motions have been classified into three types by relative motions between end-effectors of master and slave robots, which is concurrent cooperation, coupled synchronous cooperation and combined synchronous cooperation. Based on this classification, position /orientation constraints and joint velocity constraints are explored in-depth here. In order to validate the path planning method and the theoretical developments in motion constraints analysis, representative experiments based on two industrial robots, Motoman VA1400 and HP20, are provided at the end of the paper. The experimental results have proved both the effectiveness of the path planning method and the correctness of the constraints analysis.

  10. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  11. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  12. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  13. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  14. Executive summary, Hanford Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    1992-08-01

    A pollution prevention plan is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Hanford Site Pollution Prevention Plan is designed to eliminate or minimize pollutant releases to all environmental media from all aspects of Site operations. These efforts offer increased protection of public health and the environment. This plan reflects the goals and policies for pollution prevention at the Hanford Site and represents an ongoing effort to make pollution prevention part of the Site operating philosophy. The plan encompasses hazardous waste only and excludes radioactive waste and radioactive mixed waste

  15. Hanford Site Transuranic (TRU) Waste Certification Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Hanford Site Transuranic Waste Certification Plan establishes the programmatic framework and criteria with in which the Hanford Site ensures that contract-handled TRU wastes can be certified as compliant with the WIPP WAC and TRUPACT-II SARP

  16. Hanford Site Transuranic (TRU) Waste Certification Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-09-09

    The Hanford Site Transuranic Waste Certification Plan establishes the programmatic framework and criteria within which the Hanford Site ensures that contract-handled TRU wastes can be certified as compliant with the WIPP WAC and TRUPACT-II SARP.

  17. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  18. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    Science.gov (United States)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  19. Master Plan UMKM Berbasis Perikanan untuk Meningkatkan Pengolahan Produk Ikan yang Memiliki Nilai Tambah Tinggi

    OpenAIRE

    Meydianawathi, Luh Gede; Wiagustini, Ni Luh Putu; Riana, I Gede

    2014-01-01

    This research aims to generate a Master plan of fisheries-based SME development concept in Bali region, in order to build Bali as the centre for production and processing of fishery products in the Coridor of Bali-Nusa Tenggara. In Year-1 of the study period, the research activities carried out includes three processes, including analysis of the potensial of SMEs, analyzes the business cycle, and identification of barriers and chalenges. By using the method of linear regression analysis, Geog...

  20. Facility planning and site development

    International Nuclear Information System (INIS)

    Reisman, R.C.; Handmaker, H.

    1986-01-01

    Planning for a magnetic resonance imaging (MRI) facility should provide for the efficient operation of current and future MRI devices and must also take into consideration a broad range of general planning principles. Control of budgeted facility costs and construction schedules is of increasing importance due to the magnitude of expense of MRI facility development as well as the need to protect institutional or entrepreneurial investment. In a competitive environment facility costs may be the determining factor in a project's success

  1. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter 7 of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi (Estonia) present technical data on production units, also with regard to new facilities. (ARW)

  2. On-site emergency planning

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture covers the Emergency Planning of the Operating Organization and does not describe the functions and responsibilities of the Regulatory Body and public authorities. The lecture is based on the Codes of Practice and Safety Guides of the International Atomic Energy Agency (IAEA) and arrangements as in use in the Swiss Nuclear Power Station Beznau. (orig.)

  3. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  4. Savannah River Site's Site Specific Plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  5. Hazardous waste operational plan for site 300

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department

  6. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  7. Strategic plan for Hanford site information management

    International Nuclear Information System (INIS)

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site's decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE

  8. Evolutionary optimization technique for site layout planning

    KAUST Repository

    El Ansary, Ayman M.; Shalaby, Mohamed

    2014-01-01

    of design requirements. The developed technique is based on genetic algorithm which explores the search space for possible solutions. This study considers two dimensional site planning problems. However, it can be extended to solve three dimensional cases. A

  9. Site Transition Plan Guidance, December 2004

    International Nuclear Information System (INIS)

    2004-01-01

    A short Department of Energy program document has been created to provide an outline on what the Site Transition Plan (STP) objectives are for the transition from the Office of Environmental Management to the newly established Office of Legacy Management

  10. Optimal Pricing and Production Master Planning in a Multiperiod Horizon Considering Capacity and Inventory Constraints

    Directory of Open Access Journals (Sweden)

    Neale R. Smith

    2009-01-01

    Full Text Available We formulate and solve a single-item joint pricing and master planning optimization problem with capacity and inventory constrains. The objective is to maximize profits over a discrete-time multiperiod horizon. The solution process consists of two steps. First, we solve the single-period problem exactly. Second, using the exact solution of the single-period problem, we solve the multiperiod problem using a dynamic programming approach. The solution process and the importance of considering both capacity and inventory constraints are illustrated with numerical examples.

  11. FY 2017 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-11-30

    For more than 50 years, the United States (U.S.) Department of Energy’s (DOE’s) Pacific Northwest National Laboratory (PNNL) has advanced the frontiers of science and technology through courageous discovery and innovation. Our multidisciplinary team of more than 4,400 scientists, engineers, and support professionals is tackling global sustainability challenges in our science, energy, environmental, and security missions. For example, our research on how human and natural systems interact is critical to informing sustainable solutions to the nation’s energy and environmental challenges. PNNL is equally committed to sustainability right here at home, and we are making excellent progress toward the goals described in this plan. We are working on ongoing challenges, such as reducing the energy required to meet our research mission and promoting conservation among our employees.

  12. The Architect Carlos Contreras and the master plan of Aguascalientes, 1948. Modern city planning and influence on urban morphology

    Directory of Open Access Journals (Sweden)

    Alejandro Acosta Collazo

    2015-04-01

    Full Text Available This paper aims to analyze the ordering interest related to industry in the city, workers' housing needs, the impact on the phenomenon of the city shape of the moment and building complex urban morphology consistent, positive or negative, with a planning practice. The labor colonies and Industrial guild were the product of a social response to the demands of the manufacturing city in the first half of the twentieth century. Thanks to the Master Plan by architect Carlos Contreras Elizondo for the city of Aguascalientes in 1948. Also, this article seeks to address the impact of the Plan in the historic centreof Aguascalientes, which was modified over the years to meet the needs that arose.

  13. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  14. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  15. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  16. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  17. Developing a master plan for hospital solid waste management: A case study

    International Nuclear Information System (INIS)

    Karamouz, Mohammad; Zahraie, Banafsheh; Kerachian, Reza; Jaafarzadeh, Nemat; Mahjouri, Najmeh

    2007-01-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management

  18. Istra district heating system. General technical report. Appendix 1 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve the heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one issue for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers' lacking ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. The General Technical Report evaluates the technical situation and describes system improvements at a general level. The intention with this report is to provide important information useful to other district heating companies in Russia. (au)

  19. Istra district heating system. Specific technical report. Appendix 2 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one subject for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system, the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. (EHS)

  20. Master plan envisions multi-billion-dollar expansion of Vietnam's electricity monopoly

    International Nuclear Information System (INIS)

    2001-12-01

    Massive investment in Vietnam's electricity monopoly by Western aid and export credit agencies form part of the ten-year master plan developed for Vietnam. Central planning and political patronage, instead of market assessments and customer choice form the basis for monopoly investments in a centralized grid linking big hydro, gas, coal, and nuclear power projects. Western aid agencies might effectively crowd out viable private-sector energy investments by financing power projects considered too large and risky by the private sector. These investments by Western aid agencies would assist in winning contracts for favoured exporters of engineering services and equipment. It would be a breeding ground for corruption in Vietnam if market discipline, public oversight, and enforceable property rights are not present in the face of power sector aid. There is a real possibility that damages to the environment could result from electricity investments, and some communities might be victimized, electricity costs might increase, the indebtedness level of the population might increase

  1. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  2. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  3. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.

    2009-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  4. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan

    2011-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  5. A review on salt lake city, Kolkata, India: Master planning and realization

    Directory of Open Access Journals (Sweden)

    Tošković Dobrivoje

    2008-01-01

    Full Text Available Motivation for construction of Salt Lake City comes from the circumstances characterizing life in Calcutta known by its social, political and cultural activities. Among many problems, the City was faced with poverty and overcrowding. West Bengal Government realized that serious steps have to be taken to resolve the situation. One of the biggest actions of the Government was creation of so called 'NEDECO' Plan for reclamation certain area of the Salted Lakes, followed by the tender for urban planning. The enterprise for water ways Ivan Milutinović was considered the most convenient for both: reclamation and planning. The Conceptualization covers the Main Aims and interests forming plan basis where three factors were selected: urban character, new vs old town, inhabitants and town growth. Follows Existing Land Use Pattern of the Municipal Area. The realization of the Salt Lake Master Plan, as a part of the Municipal Area, is shown through an Overview of Achieved Infrastructure covering Roads, Water Supply, Sewerage, Area Level Storm Water Drainage, Solid Waste Management and, finally, through the Other Municipal Services, such as: Administrative Infrastructure, Health Infrastructure, Greeneries, Water bodies, Socio-Cultural Infrastructure. .

  6. Site management plan: Douglas Point Ecological Laboratory

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.

    1979-01-01

    A portion of the Douglas Point Site has been set aside for use as an ecological monitoring facility (DPEL). Plans call for it to provide for long-term scientific study and analysis of specific terrestrial and aquatic ecological systems representative of the coastal plain region of the mid-Atlantic United States. Discussion of the program is presented under the following section headings: goals and objectives; management and organization of DPEL; laboratory director; site manager; monitoring manager; research manager; and, organizational chart. The seven appendixes are entitled: detailed site description; supplemental land use plan; contract between Potomac Electric Power Company and Charles County Community Collge (CCCC); research and monitoring projects initiated at the Douglas Point Power Plant site; advisory committees; facilities and equipment; and CCCC personnel resumes

  7. AEA Technology, Harwell site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This plan, describes the site arrangements and facilities for dealing with an emergency at Harwell. These arrangements consist of amongst other things provision of suitably qualified, experienced and trained staff to take up posts, provision of suitable facilities and equipment, arrangements to alert and protect persons on and off the site, liaison and contact arrangements with external agencies and organisations and supply of information before and during any emergency. Other organisations have their own arrangements for dealing with an emergency at AEA Technology Harwell. The arrangements for dealing with any off-site consequences are drawn together in the ''Oxfordshire County Council Essential Services Emergency Plan (Off-Site) for AEA Technology, Harwell''. Prior information for members of the public who may be affected in the event of an emergency at Harwell is issued in the form of leaflets. (author)

  8. Hanford site transuranic waste sampling plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed

  9. Defense Acquisitions: Antiarmor Munitions Master Plan Does Not Identify Potential Excesses or Support Planned Procurements

    National Research Council Canada - National Science Library

    2000-01-01

    .... According to the report, the plan should identify the projected armored threat and the projected quantity of all antiarmor weapons, whether fielded or in development, with the purpose of identifying...

  10. Waste repository planned for Bruce Site

    International Nuclear Information System (INIS)

    King, F.

    2004-01-01

    Ontario Power Generation (OPG) and Kincardine, the municipality nearest the Bruce site, have agreed in principal to the construction of a deep geologic repository for low and medium level radioactive waste on the site. The two parties signed the 'Kincardine Hosting Agreement' on October 13, 2004 to proceed with planning, seek regulatory approval and further public consultation of the proposed project. A construction Licence is not expected before 2013. (author)

  11. Experience of Sponge City Master Plan: A Case Study of Nanning City

    Institute of Scientific and Technical Information of China (English)

    Zhang Wei; Wang Jiazhuo; Che Han; Wang Chen; Zhang Chunyang; Shi Lian; Fan Jin; Li Caige

    2017-01-01

    As a new urban development pattern, the construction of sponge cities has been deeply integrated into the new urbanization and water safety strategy. Nanning City, as one of the first batch of experimental sponge cities in China, has undertaken exploration and practice on sponge city planning, construction, and management. The sponge city master plan of Nanning City establishes an urban ecological spatial pattern in order to protect the security of the sponge base. The sponge city construction strategy has also proposed an overall construction strategy of a sponge city in line with urban development features. Through the systematic analysis and planning, a “23+10+202” pattern of sponge city construction has been formed. “23” represents 23 drainage basins, in which major sponge facilities such as storage facilities, waterfront buffer zones, wetland parks, ecological rainwater corridor and sponge parks are allocated. “10” represents 10 sponge functional zones, which provide important reference for the establishment of sponge city construction index system. “202” represents 202 management units, which decomposes the general objective and provides technical support not only for sponge city construction and management, but also for the implementation of general objectives in the regulatory plan as well.

  12. Expanding Nuclear Power Programmes - Romanian experience: Master - Nuclear Materials and Technologies Educational Plan

    International Nuclear Information System (INIS)

    Valeca, S.; Valeca, M.

    2012-01-01

    The main objectives of the Master Nuclear Materials and Technologies Educational Plan are: 1. To deliver higher education and training in the following specific domains, such as: Powders Technology and Ceramic Materials, Techniques of Structural Analysis, Composite Materials, Semiconductor Materials and Components, Metals and Metallic Alloys, Optoelectronic Materials and Devices, Nuclear Materials, The Engineering of Special Nuclear Materials, 2. To train managers of the Nuclear Waste Products and Nuclear Safety, 3. To qualify in ICT Systems for Nuclear Process Guidance, 4. To qualify in Environmental Protection System at the Level of Nuclear Power Stations, 5. To train managers for Quality Assurance of Nuclear Energetic Processes, 6. To deliver higher education and training regarding the International Treatises, Conventions and Settlements in force in the field of nuclear related activities. (author)

  13. Site and facility transportation services planning documents

    Energy Technology Data Exchange (ETDEWEB)

    Ratledge, J.E. (Oak Ridge National Lab., TN (USA)); Danese, L.; Schmid, S. (Science Applications International Corp., Oak Ridge, TN (USA))

    1990-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab.

  14. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  15. Site and facility transportation services planning documents

    International Nuclear Information System (INIS)

    Ratledge, J.E.; Danese, L.; Schmid, S.

    1990-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab

  16. Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

    International Nuclear Information System (INIS)

    Che Xiuzhen; English, Alex; Lu Jia; Chen, Yongqin David

    2011-01-01

    The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: ·as a tool and process for achieving more sustainable and strategic planning; ·to determine the level of integration of SEA within the planning system; and, ·its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

  17. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  18. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  19. Idaho National Laboratory Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    E. D. Sellers

    2007-01-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  20. Idaho National Laboratory Site Pollution Prevention Plan

    Energy Technology Data Exchange (ETDEWEB)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  1. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  2. Draft reclamation program plan for site characterization

    International Nuclear Information System (INIS)

    1989-08-01

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation's first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs

  3. Reclamation plans at uranium mill tailings sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.

    1990-01-01

    Long-term stability of waste impoundments is of concern because of the long time periods over which various types of waste may remain active. Over the past decade much technology has been developed specifically for reclamation of uranium mill tailings impoundments. Aspects of this technology will be discussed here and is presented as also being directly applicable to reclamation of industrial waste impoundments in general. The paper discusses Title I and Title II sites which represent two different generations in uranium tailings impoundment construction. The comparison between the two represent differences in philosophies as well as in impoundment type. Reclamation of uranium mill tailings impoundments in the U.S. is controlled by Federal legislation, which has set forth the regulatory framework for reclamation plan approval. Title I requirements govern government owned inactive sites and Title II requirements govern active tailings impoundments or those operated by private industries. While the Title I and Title II designation may result in a slightly different regulatory process, reclamation of uranium tailings sites has the same. Differences between Title I and Title II reclamation plans to achieve surface stability relate primarily to the embankment and surface covers. The differences in the cover designs result from site-specific conditions, rather than from differences in engineering approaches or the regulatory process. This paper discusses the site-specific conditions that affect the selection of cover designs, and provides a comparative example to illustrate the effect of this condition

  4. Site characterization plan: Gulf Coast salt domes

    International Nuclear Information System (INIS)

    1983-12-01

    The National Waste Terminal Storage (NWTS) program of the US Department of Energy (DOE) is responsible for developing technology and providing facilities for safe, environmentally acceptable, permanent disposal of high-level nuclear waste. The Office of Nuclear Waste Isolation has been intensively investigating Gulf Coast Salt Dome Basin salt domes and bedded salt in Texas and Utah since 1978. In the Gulf Coast, the application of screening criteria in the region phase led to selection of eight domes for further study in the location phase. Further screening in the area phase identified four domes for more intensive study in the location phase: Oakwood Dome, Texas; Vacherie Dome, Louisiana; and Richton Dome and Cypress Creek Dome, Mississippi. For each dome, this Site Characterization Plan identifies specific hydrologic, geologic, tectonic, geochemical, and environmental key issues that are related to the DOE/NWTS screening criteria or affect the feasibility of constructing an exploratory shaft. The Site Characterization Plan outlines studies need to: (1) resolve issues sufficiently to allow one or more salt domes to be selected and compared to bedded salt sites in order to determine a prime salt site for an exploratory shaft; (2) conduct issue-related studies to provide a higher level of confidence that the preferred salt dome site is viable for construction of an exploratory shaft; and (3) provide a vehicle for state input to issues. Extensive references, 7 figures, 20 tables

  5. Implementation of the Master Plan Activities in Serayu River Voyage (SRV Within the Framework of Tourism Development in Banyumas Regency

    Directory of Open Access Journals (Sweden)

    Imam Pamungkas

    2015-02-01

    Full Text Available The Master Plan Activity of Serayu River Voyage (SRV for tourism development in Banyumas Regency were expected to be completed within five years from 2008 to 2012, but during the period until 2013, most programs and activities have not been implemented. The results showed that the Master Plan of SRV in the framework of tourism development in Banyumas Regency has not been implemented properly. The cause is the absence of good coordination between agencies, the lack programs and activities integration, supporting documents have not been revised, absence of good socialization, and the lack of private sector contribution. The factors that constrain and support implementation of the Master Plan is described as follows. Supporting factors: competent human resources (implementor already available at the managerial level and have intellectual tourism, it is only need to add personnel in the sector of culture; the availability of adequate budget; institutions that have been effective and efficient; High community response; High commitment of Banyumas Regent and cooperation related parties (stakeholders; and natural conditions of Serayu tend to calm and the river slope condition is small. The constrain factors: regulatory policies; integration of programs and activities; coordination and socialization implied sectoral ego that need to be addressed. Keywords : implementation, master plan, Serayu River Voyage, human resources, regulation

  6. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  7. Georgia Institute of Technology chilled water system evaluation and master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-15

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction in the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.

  8. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Evolutionary optimization technique for site layout planning

    KAUST Repository

    El Ansary, Ayman M.

    2014-02-01

    Solving the site layout planning problem is a challenging task. It requires an iterative approach to satisfy design requirements (e.g. energy efficiency, skyview, daylight, roads network, visual privacy, and clear access to favorite views). These design requirements vary from one project to another based on location and client preferences. In the Gulf region, the most important socio-cultural factor is the visual privacy in indoor space. Hence, most of the residential houses in this region are surrounded by high fences to provide privacy, which has a direct impact on other requirements (e.g. daylight and direction to a favorite view). This paper introduces a novel technique to optimally locate and orient residential buildings to satisfy a set of design requirements. The developed technique is based on genetic algorithm which explores the search space for possible solutions. This study considers two dimensional site planning problems. However, it can be extended to solve three dimensional cases. A case study is presented to demonstrate the efficiency of this technique in solving the site layout planning of simple residential dwellings. © 2013 Elsevier B.V. All rights reserved.

  10. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  11. Changing Perspectives on the Planning of Ankara (1924-2007 and Lessons for a New Master-Planning Approach to Developing Cities

    Directory of Open Access Journals (Sweden)

    Olgu Çalişkan

    2014-07-01

    Full Text Available As one of the newly planned capitals in the 20th century – like Islamabad, Canberra and Brazil –, Ankara represents an original case in planning history: from shaping a new town under the influence of early European urbanism to the control of a dynamic metropolitan form by structural planning approaches. Forming its urban core according to the initial planning perspectives between the beginning of 1930s and the mid-1970s, the city has entered a rapid phase of space production in its extensions for about the last thirty years.In the current period of development, highly fragmented urban peripheral formation has being occurred in Ankara. Since the existing trend on the dispersion of urban form lacking spatial coherence at different scale-levels causes the dominance of the private domain and a loss of urbanity, this trend might at first glance be considered as a break with the European tradition and the emergence of Anglo-Americanization in Turkish planning system in terms of looser development control approach on urban form.Before, coming to such a critical end-point, the paper prefers a closer look into the changing dynamics of master plans of the city. It is aimed to reveal the developmental logic of the city by means of master plan analysis. The comprehensive outlook – called plan matrix – is integrated into each master plan schema by correlating the basic components like main policy directions, depth of control, settlement typology, and city structure and form. Such a framework has a potential to be utilized for any kind of plan analysis at metropolitan scale for different cases. At the end of the analysis, the paper tends to address an alternative master planning approach for the similar types of developing cities striving for keeping its urban character within a fragmented urban body.

  12. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  13. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  14. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  15. Nevada Test Site Site Treatment Plan. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada's input. The options and schedules reflect a ''bottoms-up'' approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions

  16. Second ILAW Site Borehole Characterization Plan

    International Nuclear Information System (INIS)

    Reidel, S.P.

    2000-01-01

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford since 1944. Approximately 209,000 m 3 (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low-activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized. The low-activity vitrified waste will be disposed of in the 200 East Area of the Hanford Site. This report is a plan to drill and characterize the second borehole for the Performance Assessment. The first characterization borehole was drilled in 1998. The plan describes data collection activities for determining physical and chemical properties of the vadose zone and saturated zone on the northeast side of the proposed disposal site. These data will then be used in the 2005 Performance Assessment

  17. Replacement of Cross-Site Transfer System Startup Plan

    International Nuclear Information System (INIS)

    Gerken, M.D.

    1996-01-01

    This Startup Plan provides a discussion of organizational responsibilities, work planning, quality assurance (QA), personnel qualifications, and testing requirements for the Cross-Site Transfer System

  18. Hanford Site Transuranic (TRU) Waste Certification Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of US. Department of Energy (DOE) 0 435.1, ''Radioactive Waste Management,'' and the Contact-Handled (CH) Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC). WIPP-WAC requirements are derived from the WIPP Technical Safety Requirements, WIPP Safety Analysis Report, TRUPACT-II SARP, WIPP Land Withdrawal Act, WIPP Hazardous Waste Facility Permit, and Title 40 Code of Federal Regulations (CFR) 191/194 Compliance Certification Decision. The WIPP-WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WPP-WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their program for managing TRU waste and TRU waste shipments before transferring waste to WIPP. Waste characterization activities provide much of the data upon which certification decisions are based. Waste characterization requirements for TRU waste and TRU mixed waste that contains constituents regulated under the Resource Conservation and Recovery Act (RCRA) are established in the WIPP Hazardous Waste Facility Permit Waste Analysis Plan (WAP). The Hanford Site Quality Assurance Project Plan (QAPjP) (HNF-2599) implements the applicable requirements in the WAP and includes the qualitative and quantitative criteria for making hazardous waste determinations. The Hanford Site must also ensure that its TRU waste destined for disposal at WPP meets requirements for transport in the Transuranic Package Transporter-11 (TRUPACT-11). The US. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-11 requirements in the Safety Analysis Report for the TRUPACT-II Shipping Package (TRUPACT-11 SARP). In

  19. On new methodological and other standards in planning: The case of the Master Plan of Belgrade 2021

    Directory of Open Access Journals (Sweden)

    Vujošević Miodrag L.

    2002-01-01

    changed structure of stakeholders and concomitant institutional arrangements. This also applies to 'educators' in general, because the prolonged international isolation of the FR Yugoslavia has caused the gross of their knowledge and capabilities irrelevant. In sum, it seems that many planners would not be able to assume new roles that they are expected to on the part of the society at large. (8The planning/policy information, research, institutional and other support provided by the state and other agents often does not satisfy even the most basic needs in this fields, partly for a general scarcity of resources concomitant to the overall and deep social, economic and political crisis the society found itself in the 1990s. (9 Most frightfully, manipulation, paternalism and clientelism still represent dominant forms of power, which is a problem by itself in Yugoslavia being one of the most corruptive countries in the world. What is now most missing is a non-manipulative persuasion, as well as the authority of professional values, as the communication and interaction forms that seem only promising for and supportive to developing of a democratic, emancipatory and transformative planning mode. A number of attempts during the last decade to embark upon the preparation of the new 'Master Plan of the City Belgrade' (in the sequel: MP came into realization not before the democratic political changes of October 2000 took place in Serbia. However, the so far undertaken steps do not seem promising, as they failed to satisfy a number of methodological and other standards, as well as to introduce necessary innovations. Unfortunately, the MP was commissioned to the Bureau of Urban Planning of the City of Belgrade (otherwise a 'faithful ally' of all non-democratic regimes in the City's urban planning and related matters over the last more than ten years now, during which there has been a so far unrecorded squandering and illegal privatization of public urban assets, mostly uncontrolled

  20. Master plan for renewable energies + Summary for policy makers + Presentation to the Council of Ministers

    International Nuclear Information System (INIS)

    Blanc, Julien; Bitot, Stephane

    2012-01-01

    This document reports a study which aimed at determining a master plan which would allow a mix with 50 per cent of renewable energies for electricity production to be reached by 2020 in the specific case of French Polynesia. It proposes a comprehensive analysis of of the present energetic situation in Tahiti and in eleven islands of the French Polynesia. After a presentation of the social and economic context, the report proposes a diagnosis of energy and electricity consumption in Polynesia, an analysis of electricity demand and of its possible evolutions (scenarios), and an analysis of the present production (fossil thermal, hydroelectric, photovoltaic, and wind energy, quality and requirements for an island grid). It reports the analysis the potential of development of renewable energies (hydroelectricity, photovoltaic, other solar production, wind, biomass, marine renewable energies, seawater air conditioning), and the analysis of the supply-demand balance in the different scenarios for Tahiti and the other islands. Short term perspectives are discussed, and an overview of installed renewable powers is provided. A second document proposes a summary of this study under the form of a Power Point presentation illustrated by many graphs

  1. Master Plan UMKM Berbasis Perikanan untuk Meningkatkan Pengolahan Produk Ikan yang Memiliki Nilai Tambah Tinggi

    Directory of Open Access Journals (Sweden)

    I Gede Riana

    2015-11-01

    Full Text Available This research aims to generate a Master plan of fisheries-based SME development concept in Bali region, in order to build Bali as the centre for production and processing of fishery products in the Coridor of Bali-Nusa Tenggara. In Year-1 of the study period, the research activities carried out includes three processes, including analysis of the potensial of SMEs, analyzes the business cycle, and identification of barriers and chalenges. By using the method of linear regression analysis, Geographic Information System (GIS and Analytical Hierarchy Process (AHP, the study result in Year-1, obtained some information about characteristics of fisheries based SMEs Bali, consisting of: 1 there is positive effect between GDP growth and energy work on the level of productivity (output value of SMEs; 2 the need for development of fisheries-based SMEs in Bali include some operational, capital, and market access aspects. To the Bali Provincial Government, SMEs and the poblic are expected to synergize themselves, in term of institutionally, improving the quality of human recources, empowering financial institutions at the local level, as well as active participation in marketing access to the international level.

  2. National Ignition Facility Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, V.

    1997-09-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1{degree}C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  3. National Ignition Facility Site Management Plan

    International Nuclear Information System (INIS)

    Roberts, V.

    1997-01-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1 degree C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  4. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  5. Hanford site transuranic waste certification plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of U.S. Department of Energy (DOE) Order 5820.2A, ''Radioactive Waste Management, and the Waste Acceptance Criteria for the Waste Isolation Pilot Plant' (DOE 1996d) (WIPP WAC). The WIPP WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WIPP WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their management of TRU waste and TRU waste shipments before transferring waste to WIPP. The Hanford Site must also ensure that its TRU waste destined for disposal at WIPP meets requirements for transport in the Transuranic Package Transporter41 (TRUPACT-11). The U.S. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-I1 requirements in the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (NRC 1997) (TRUPACT-I1 SARP)

  6. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  7. Improving in organization of in-site planning for NPP

    International Nuclear Information System (INIS)

    Gitel'man, L.D.; Khanin, V.V.; Trunov, V.M.; Khanin, R.V.

    1986-01-01

    The organization of NPP section activity planning is considered. With regard to the structure of in-site plans by time and content, their distribution in organization control structure, order of plan development, stimulation, accounting and estimation of plan fulfillment, plan indices for each shop and plan-assignment form are developed

  8. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  9. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    2008, has been included as an appendix to the RMP Supplemental Information document. LLNL Site 200 is a research and development laboratory with infrastructure necessary to support its operations and personnel. Research and development activities at LLNL are focused on stockpile stewardship; achieving robust and vital scientific, engineering, and manufacturing capability; inertial confinement fusion; laser technology; materials and process science; computational and information sciences; basic sciences; engineering sciences; and biological sciences. Based upon CalARP Program regulations, guidance found in California Accidental Release Prevention Program (CalARP) Administering Guidance, Chapter 1, a review of facility specific documents, accident analyses summarized in this document and detailed in the LLNL Site 200 RMP Supporting Information document, LLNL has determined that each process meeting the CalARP threshold criteria meets the requirements for CalARP Program Level 1. In accordance with CalARP regulations, LLNL considers the natural segmentation of processes at Site 200 to be on a building basis and therefore consideration of inventory should be on a building basis rather than a 'site-wide' basis. Only those materials identified as equal to as or greater than the threshold quantities for the CalARP program on a building (process) level are reflected in this document. As such, materials and quantities reported in this document on a building (process) level will vary from materials and quantities reported in the LLNL Hazardous Materials Business Plan, Acutely Hazardous Material Registration Form on a site-wide level. For each process involving regulated quantities of lithium hydride, worst case accident analysis shows that the toxic endpoint lies within the site boundaries. These analyses document that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more

  10. Nevada Test Site, site treatment plan 1999 annual update

    International Nuclear Information System (INIS)

    1999-03-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  11. Innovative Stormwater Quality Tools by SARA for Holistic Watershed Master Planning

    Science.gov (United States)

    Thomas, S. M.; Su, Y. C.; Hummel, P. R.

    2016-12-01

    Stormwater management strategies such as Best Management Practices (BMP) and Low-Impact Development (LID) have increasingly gained attention in urban runoff control, becoming vital to holistic watershed master plans. These strategies can help address existing water quality impairments and support regulatory compliance, as well as guide planning and management of future development when substantial population growth and urbanization is projected to occur. However, past efforts have been limited to qualitative planning due to the lack of suitable tools to conduct quantitative assessment. The San Antonio River Authority (SARA), with the assistance of Lockwood, Andrews & Newnam, Inc. (LAN) and AQUA TERRA Consultants (a division of RESPEC), developed comprehensive hydrodynamic and water quality models using the Hydrological Simulation Program-FORTRAN (HSPF) for several urban watersheds in the San Antonio River Basin. These models enabled watershed management to look at water quality issues on a more refined temporal and spatial scale than the limited monitoring data. They also provided a means to locate and quantify potential water quality impairments and evaluate the effects of mitigation measures. To support the models, a suite of software tools were developed. including: 1) SARA Timeseries Utility Tool for managing and processing of large model timeseries files, 2) SARA Load Reduction Tool to determine load reductions needed to achieve screening levels for each modeled constituent on a sub-basin basis, and 3) SARA Enhanced BMP Tool to determine the optimal combination of BMP types and units needed to achieve the required load reductions. Using these SARA models and tools, water quality agencies and stormwater professionals can determine the optimal combinations of BMP/LID to accomplish their goals and save substantial stormwater infrastructure and management costs. The tools can also help regulators and permittees evaluate the feasibility of achieving compliance

  12. Y-12 Site-Sustainability Plan 2010

    Energy Technology Data Exchange (ETDEWEB)

    Sherry, T. D.; Kohlhorst, D. P.; Little, S. K.

    2010-12-01

    The accomplishments to date and the long-range planning of the Y-12 National Security Complex Energy Management program support the Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the guiding principles. The site is diligently working toward establishing and prioritizing projects to reach the goals that Executive Orders 13514 and 13423 set forth. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions that are based on the application of the fi ve guiding principles for High Performance Sustainable Buildings (HPSBs) to the maximum extent possible. Current limitations in achievement of the goals lie in the existing Future Years National Security Program funding profiles. Y-12 will continue to execute energy projects as funding becomes available or as they can be accomplished incrementally within existing funding profiles. All efforts will be made to integrate energy initiatives with ongoing site mission objectives. Figures ES.1-ES.4 show some examples of sustainability activities at the Y-12 Complex.

  13. Connecting Systems Model Design to Decision-Maker and Stakeholder Needs: Lessons from Louisiana's Coastal Master Plan

    Science.gov (United States)

    Fischbach, J. R.; Johnson, D.

    2017-12-01

    Louisiana's Comprehensive Master Plan for a Sustainable Coast is a 50-year plan designed to reduce flood risk and minimize land loss while allowing for the continued provision of economic and ecosystem services from this critical coastal region. Conceived in 2007 in response to hurricanes Katrina and Rita in 2005, the master plan is updated on a five-year planning cycle by the state's Coastal Protection and Restoration Authority (CPRA). Under the plan's middle-of-the-road (Medium) environmental scenario, the master plan is projected to reduce expected annual damage from storm surge flooding by approximately 65% relative to a future without action: from 5.3 billion to 2.2 billion in 2040, and from 12.1 billion to 3.7 billion in 2065. The Coastal Louisiana Risk Assessment model (CLARA) is used to estimate the risk reduction impacts of projects that have been considered for implementation as part of the plan. Evaluation of projects involves estimation of cost effectiveness in multiple future time periods and under a range of environmental uncertainties (e.g., the rates of sea level rise and land subsidence, changes in future hurricane intensity and frequency), operational uncertainties (e.g., system fragility), and economic uncertainties (e.g., patterns of population change and asset exposure). Between the 2012 and 2017 planning cycles, many improvements were made to the CLARA model. These included changes to the model's spatial resolution and definition of policy-relevant spatial units, an improved treatment of parametric uncertainty and uncertainty propagation between model components, the addition of a module to consider critical infrastructure exposure, and a new population growth model. CPRA also developed new scenarios for analysis in 2017 that were responsive to new scientific literature and to accommodate a new approach to modeling coastal morphology. In this talk, we discuss how CLARA has evolved over the 2012 and 2017 planning cycles in response to the needs

  14. The establishment of master plan for developing advanced I and C technology -The development of advanced instrumentation and control technology-

    International Nuclear Information System (INIS)

    Ham, Chang Shik; Lee, Byung Sun; Kwon, Kee Choon; Lee, Dong Young; Hwang, In Koo; Lee, Jang Soo; Kim, Jung Soo; Kim, Chang Hwoi; Jung, Chul Hwan; Na, Nan Ju; Dong, In Sook; Kang, Soon Gu; Lyu, Chan Ho; Song, Soon Ja

    1994-07-01

    Although several organizations are performing their tasks making efforts to develop new digital technology for application to existing nuclear power plants as well as new plants of the future, their projects are similar to each other and have possibilities of redundant investment. Therefore, KAERI have established a Master Plan to define the suitable work-scope of each Instrumentation and Control (I and C) development project and proceed its development items continuously. Furthermore, in the project, several kinds of advanced technology for application of computer science and digital electronics were studied to obtain better reliability of the I and C systems and reduce opertor's burden. For establishing the Master Plan, functions of I and C system of NPPs were surveyed. Especially EPRI URD was deeply analyzed for setting up a basis of the foreign countries were referred for the Master Plan. For the new technology survey, fault-tolerant control technology and control system performance analysis methods were studied. Requirements of alarm and information system as well as technology of I and C network system of NPPs were also established to introduce the advantages of commercial distributed control system. (Author)

  15. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  16. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  17. Fiscal Year 2015 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Monica Rene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-16

    Los Alamos National Laboratory is taking action to operate as a living laboratory for sustainable solutions in buildings, climate, energy, purchasing, transportation, waste, and water. LANL prepared the fiscal year (FY) 2015 Site Sustainability Plan (SSP) to describe progress towards the goals established in the SSPP. In addition, per the requirements of DOE Order 436.1, Departmental Sustainability, Los Alamos National Laboratory (LANL) uses its International Organization for Standardization (ISO) 14001:2004 certified Environmental Management System (EMS) to establish objectives to improve compliance, reduce environmental impacts, increase operational capacity, and meet long-term sustainability goals. The goals of the 2015 SSP are fully integrated into LANL’s institutional environmental objectives under the EMS and its Long-Term Strategy for Environmental Stewardship & Sustainability (LTSESS).

  18. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  19. LLNL Livermore site Groundwater Surveillance Plan

    International Nuclear Information System (INIS)

    1992-04-01

    Department of Energy (DOE) Order 5400.1 establishes environ-mental protection program requirements, authorities, and responsibilities for DOE operations to assume compliance with federal, state, and local environmental protection laws and regulations; Federal Executive Orders; and internal DOE policies. ne DOE Order contains requirements and guidance for environmental monitoring programs, the objectives of which are to demonstrate compliance with legal and regulatory requirements imposed by federal, state, and local agencies; confirm adherence to DOE environmental protection polices; and support environmental management decisions. The environmental monitoring programs consist of two major activities: (1) measurement and monitoring of effluents from DOE operations, and (2) surveillance through measurement, monitoring, and calculation of the effects of those operations on the environment and public health. The latter concern, that of assessing the effects, if any, of Lawrence Livermore National Laboratory (LLNL) operations and activities on on-site and off-site surface waters and groundwaters is addressed by an Environmental Surveillance Program being developed by LLNL. The Groundwater Surveillance Plan presented here has been developed on a sitespecific basis, taking into consideration facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, the extent and use of local water resources, and specific local public interest and concerns

  20. Master-slave control with trajectory planning and Bouc-Wen model for tracking control of piezo-driven stage

    Science.gov (United States)

    Lu, Xiaojun; Liu, Changli; Chen, Lei

    2018-04-01

    In this paper, a redundant Piezo-driven stage having 3RRR compliant mechanism is introduced, we propose the master-slave control with trajectory planning (MSCTP) strategy and Bouc-Wen model to improve its micro-motion tracking performance. The advantage of the proposed controller lies in that its implementation only requires a simple control strategy without the complexity of modeling to avoid the master PEA's tracking error. The dynamic model of slave PEA system with Bouc-Wen hysteresis is established and identified via particle swarm optimization (PSO) approach. The Piezo-driven stage with operating period T=1s and 2s is implemented to track a prescribed circle. The simulation results show that MSCTP with Bouc-Wen model reduces the trajectory tracking errors to the range of the accuracy of our available measurement.

  1. 6 CFR 27.225 - Site security plans.

    Science.gov (United States)

    2010-01-01

    ... Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.225 Site security plans. (a) The Site Security Plan must... chemical facility security. (b) Except as provided in § 27.235, a covered facility must complete the Site...

  2. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  3. Site characterization plan: Public Handbook, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    1989-01-01

    The Yucca Mountain site in Nevada has been designated by the Nuclear Waste Policy Act of 1982, as amended, for detailed study as the candidate site for the first US geologic repository for spent nuclear fuel and high-level radioactive waste. The detailed study --- called ''site characterization'' --- will be conducted by the Department of Energy (DOE) to determine the suitability of the site for a repository and, if the site is suitable, to obtain from the Nuclear Regulatory Commission authorization to construct the repository. As part of the site characterization study, DOE has prepared a Site Characterization Plan (SCP) for the Yucca Mountain site. The Site Characterization Plan is a nine-volume document, approximately 6300 pages in length, which describes the activities that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. Part 1 of this Handbook explains what site characterization is and how the Site Characterization Plan (Plan) relates to it. Part 2 tells how to locate subjects covered in the Plan. Another major purpose of this Handbook is to identify opportunities for public involement in the review of the Site Characterization Plan. DOE wants to be sure that the public has adequate opportunities to learn about the Plan and review the results of the subsequent technical studies. 14 refs

  4. Impact of Urban Heat Island under the Hanoi Master Plan 2030 on Cooling Loads in Residential Buildings

    Directory of Open Access Journals (Sweden)

    Tran Hoang Hai Nam

    2015-01-01

    Full Text Available This study aims to evaluate the influence of urban heat island (UHI under the Hanoi Master Plan 2030 on the energy consumption for space cooling in residential buildings. The weather conditions under the current and future status (master plan condition simulated in the previous study (Trihamdani et al., 2014 were used and cooling loads in all the residential buildings in Hanoi over the hottest month were estimated under the simulated current and future conditions by using the building simulation program, TRNSYS (v17. Three most typical housing types in the city were selected for the simulation. The cooling loads of respective housing types were obtained in each of the districts in Hanoi. The results show that the total cooling loads over June 2010 is approximately 683 Terajoule (TJ under the current status, but it is predicted to increase to 903 TJ under the master plan condition. The increment is largely due to the increase in number of households (203 TJ or 92%, but partially due to the increase in urban temperature, i.e. UHI effect (17 TJ or 8%. The increments in new built-up areas were found to be larger than those in existing built-up areas. The cooling load in apartment is approximately half of that in detached house, which is approximately half of that in row house. Moreover, it was seen that although sensible cooling loads increased with the increase in outdoor temperature, the latent cooling loads decreased due to the decrease in absolute humidity and the increase in air temperature.

  5. TWRS phase I privatization site environmental baseline and characterization plan

    International Nuclear Information System (INIS)

    Shade, J.W.

    1997-01-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan

  6. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  7. Energy-Integrating Master Plan for the City of Atlantic City, New Jersey: energy conservation element. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-01

    The Master Plan describes a coordinated energy-conservation effort for the City, the effective application and ultimate success of which depend primarily on the active involvement of the City government and its functional departments. Following an introductory section, Section XXI, Community Energy Determinants, describes the natural and man-made environment, growth and energy profiles, and the institutional environment. Additional sections are entitled: Energy-Conservation Options (passive energy options and active energy-conservation options); Energy Integration; Community Energy Management; Energy-Conservation Implementation Plan; and an appendix containing an energy-related glossary, a directory to various sources of information on energy conservation, various technical documents, a copy of the National Energy Act, and a bibliography. (MCW)

  8. The National Shipbuilding Research Program. United States Shipbuilding Standards Master Plan Update

    National Research Council Canada - National Science Library

    1997-01-01

    .... 7. Develop a marketing strategy for the plan. 8. Adopt or convert existing global standards for domestic use. This update includes an updated survey, the SP-6 tactical plan, new windows into standards on the internet, and more.

  9. Savannah River Site approved site treatment plan, 2000 annual update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2000-04-20

    The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  10. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    International Nuclear Information System (INIS)

    Lawrence, B.

    1999-01-01

    The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information

  11. Savannah River Site approved site treatment plan, 2000 annual update

    International Nuclear Information System (INIS)

    Lawrence, B.

    2000-01-01

    The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information

  12. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  13. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  14. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  15. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  16. Site Decommissioning Management Plan. Supplement 1

    International Nuclear Information System (INIS)

    Fauver, D.N.; Weber, M.F.; Johnson, T.C.; Kinneman, J.D.

    1995-11-01

    The Nuclear Regulatory Commission (NRC) staff has identified 51 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety, they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC stairs strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 51 sites and describes the status of decommissioning activities at the sites. This is supplement number one to NUREG-1444, which was published in October 1993

  17. Savannah River Site Environmental Implentation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described

  18. Environmental Regulatory Compliance Plan for Site Characterization

    International Nuclear Information System (INIS)

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab

  19. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  20. An LNS Approach for Container Stowage Multi-port Master Planning

    DEFF Research Database (Denmark)

    Pacino, Dario

    2013-01-01

    The generation of competitive stowage plans have become a priority for the shipping industry. Stowage planning is NP-hard and is a challenging optimization problem in practice. Two-phase decomposition approaches have proved to give viable solutions. We propose a large neighborhood search (LNS) to...

  1. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  2. Plans for characterization of salt sites

    International Nuclear Information System (INIS)

    Heim, G.E.; Matthews, S.C.; Kircher, J.F.; Kennedy, R.K.

    1983-01-01

    This basic salt site characterization program has been designed to provide the data required to support the design, performance assessment, and licensing of each of the principal project elements: the repository, the shafts, and the surface facilities. The work has been sequenced to meet the design and licensing schedule. It is anticipated that additional characterization activities will be performed to address site-specific considerations and to provide additional information to address questions which arise during the evaluation of characterization data. 3 figures, 3 tables

  3. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  4. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  5. 1994 INEL site-specific plan

    International Nuclear Information System (INIS)

    Couch, B.

    1994-01-01

    This report presents plans for environmental restoration and waste management activities at the Idaho National Engineering Laboratory for fiscal year 1994. This years's plan focuses on issues affecting the Environmental Restoration and Waste Management Programs. The Environmental Restoration Program is concerned with all aspects of assessment and cleanup of inactive operations. It involves assessing and cleaning up (where necessary) inactive INEL waste areas that could release harmful substances into the environment, as well as safely managing surplus nuclear facilities. The Waste Management program involves treatment, storage, and disposal of radioactive, hazardous, mixed, and industrial waste by DOE activities. This program is designed to protect the safety of INEL employees, the public, and the environment in the design, construction, maintenance, and operation of INEL treatment, storage, and disposal facilities. It operates facilities in a cost-effective, environmentally sound, regulatory compliant, and publicly acceptable manner

  6. 1994 INEL site-specific plan

    Energy Technology Data Exchange (ETDEWEB)

    Couch, B.

    1994-05-01

    This report presents plans for environmental restoration and waste management activities at the Idaho National Engineering Laboratory for fiscal year 1994. This years`s plan focuses on issues affecting the Environmental Restoration and Waste Management Programs. The Environmental Restoration Program is concerned with all aspects of assessment and cleanup of inactive operations. It involves assessing and cleaning up (where necessary) inactive INEL waste areas that could release harmful substances into the environment, as well as safely managing surplus nuclear facilities. The Waste Management program involves treatment, storage, and disposal of radioactive, hazardous, mixed, and industrial waste by DOE activities. This program is designed to protect the safety of INEL employees, the public, and the environment in the design, construction, maintenance, and operation of INEL treatment, storage, and disposal facilities. It operates facilities in a cost-effective, environmentally sound, regulatory compliant, and publicly acceptable manner.

  7. The poplar MYB master switches bind to the SMRE site and activate the secondary wall biosynthetic program during wood formation.

    Directory of Open Access Journals (Sweden)

    Ruiqin Zhong

    Full Text Available Wood is mainly composed of secondary walls, which constitute the most abundant stored carbon produced by vascular plants. Understanding the molecular mechanisms controlling secondary wall deposition during wood formation is not only an important issue in plant biology but also critical for providing molecular tools to custom-design wood composition suited for diverse end uses. Past molecular and genetic studies have revealed a transcriptional network encompassing a group of wood-associated NAC and MYB transcription factors that are involved in the regulation of the secondary wall biosynthetic program during wood formation in poplar trees. Here, we report the functional characterization of poplar orthologs of MYB46 and MYB83 that are known to be master switches of secondary wall biosynthesis in Arabidopsis. In addition to the two previously-described PtrMYB3 and PtrMYB20, two other MYBs, PtrMYB2 and PtrMYB21, were shown to be MYB46/MYB83 orthologs by complementation and overexpression studies in Arabidopsis. The functional roles of these PtrMYBs in regulating secondary wall biosynthesis were further demonstrated in transgenic poplar plants showing an ectopic deposition of secondary walls in PtrMYB overexpressors and a reduction of secondary wall thickening in their dominant repressors. Furthermore, PtrMYB2/3/20/21 together with two other tree MYBs, the Eucalyptus EgMYB2 and the pine PtMYB4, were shown to differentially bind to and activate the eight variants of the 7-bp SMRE consensus sequence, composed of ACC(A/TA(A/C(T/C. Together, our results indicate that the tree MYBs, PtrMYB2/3/20/21, EgMYB2 and PtMYB4, are master transcriptional switches that activate the SMRE sites in the promoters of target genes and thereby regulate secondary wall biosynthesis during wood formation.

  8. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Science.gov (United States)

    2012-03-05

    ... Northrup, Project Manager, BLM Moab Field Office, 82 East Dogwood, Moab, UT 84532, telephone (435) 259-2151... Instruction Memorandum No. 2010-117. The MLP process will provide additional planning and analysis for areas... with varying mitigation levels for leasing. The planning area covers about 783,000 acres in east...

  9. Interface between the production plan and the master production schedule in assembly environments

    OpenAIRE

    Moya Navarro, Marcos; Sánchez Brenes, Magaly

    2012-01-01

    In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environmen...

  10. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  11. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  12. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  13. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  14. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    International Nuclear Information System (INIS)

    1994-01-01

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams

  15. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  16. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  17. 18th ICPR paper: Master Production Scheduling and A Comparision of Material Requirements Planning and Cover-Time Planning

    OpenAIRE

    2006-01-01

    Abstract For a company?s long-term profitability, most important processes are the way it starts parts of the manufacturing process before the customer order arrives and the way it determines and promises delivery quantities and times for the customer orders. In practical computer applications Material Requirement Planning and/or Reorder point systems are the base techniques mostly used. This article pre?sents Cover-Time Planning, a variant of a reorder point system. Cover-Time Pla...

  18. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  19. A Vision for the Future: Site-Based Strategic Planning.

    Science.gov (United States)

    Herman, Jerry J.

    1989-01-01

    Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…

  20. Project Gasbuggy well plugging and site restoration plan

    International Nuclear Information System (INIS)

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  1. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  2. Site Scientific Mission Plan for the Southern Great Plains CART site: January--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, J.M.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1993-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1994, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM Functional Teams (Management Team, Experiment Support Team, Operations Team, Data Management Team, Instrument Team, and Campaign Team), and it serves to disseminate the plans more generally within the ARM Program and among the Science Team. This document includes a description of the site`s operational status and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods. Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, the ARM Program Experiment Center, and the aforementioned ARM Program Functional Teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  3. Site scientific mission plan for the Southern Great Plains CART Site, January--June 1999

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Sisterson, D.L.; Lamb, P.

    1999-03-10

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 1999, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  4. Site scientific mission plan for the Southern Great Plains CART site: July--December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on July 1, 1998, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  5. Idaho Chemical Processing Plant Site Development Plan

    International Nuclear Information System (INIS)

    Ferguson, F.G.

    1994-02-01

    The Idaho Chemical Processing Plant (ICPP) mission is to receive and store spent nuclear fuels and radioactive wastes for disposition for Department of Energy (DOE) in a cost-effective manner that protects the safety of Idaho National Engineering Laboratory (INEL) employees, the public, and the environment by: Developing advanced technologies to process spent nuclear fuel for permanent offsite disposition and to achieve waste minimization. Receiving and storing Navy and other DOE assigned spent nuclear fuels. Managing all wastes in compliance with applicable laws and regulations. Identifying and conducting site remediation consistent with facility transition activities. Seeking out and implementing private sector technology transfer and cooperative development agreements. Prior to April 1992, the ICPP mission included fuel reprocessing. With the recent phaseout of fuel reprocessing, some parts of the ICPP mission have changed. Others have remained the same or increased in scope

  6. Mastering the Master Space

    CERN Document Server

    Forcella, Davide; He, Yang-Hui; Zaffaroni, Alberto

    2008-01-01

    Supersymmetric gauge theories have an important but perhaps under-appreciated notion of a master space, which controls the full moduli space. For world-volume theories of D-branes probing a Calabi-Yau singularity X the situation is particularly illustrative. In the case of one physical brane, the master space F is the space of F-terms and a particular quotient thereof is X itself. We study various properties of F which encode such physical quantities as Higgsing, BPS spectra, hidden global symmetries, etc. Using the plethystic program we also discuss what happens at higher number N of branes. This letter is a summary and some extensions of the key points of a longer companion paper arXiv:0801.1585.

  7. Hanford site implementation plan for buried, transuranic-contaminated waste

    International Nuclear Information System (INIS)

    1987-05-01

    The GAO review of DOE's Defense Waste Management Plan (DWMP) identified deficiencies and provided recommendations. This report responds to the GAO recommendations with regard to the Hanford Site. Since the issuance of the DWMP, an extensive planning base has been developed for all high-level and transuranic waste at the Hanford Site. Thirty-three buried sites have been identified as possibly containing waste that can be classified as transuranic waste. Inventory reports and process flowsheets were used to provide an estimate of the radionuclide and hazardous chemical content of these sites and approximately 370 additional sites that can be classified as low-level waste. A program undertaken to characterize select sites suspected of having TRU waste to refine the inventory estimates. Further development and evaluation are ongoing to determine the appropriate remedial actions, with the objectives of balancing long-term risks with costs and complying with regulations. 18 refs., 7 figs., 6 tabs

  8. Environmental Planning Strategies for Optimum Solid Waste Landfill Siting

    International Nuclear Information System (INIS)

    Sumiani, Y.; Onn, C.C.; Mohd, M.A.D.; Wan, W.Z.J.

    2009-01-01

    The use of environmental planning tools for optimum solid waste landfill siting taking into account all environmental implications was carried out by applying Life Cycle Analysis (LCA) to enhance the research information obtained from initial analysis using Geographical Information Systems (GIS). The objective of this study is to identify the most eco-friendly landfill site by conducting a LCA analysis upon 5 potential GIS generated sites which incorporated eleven important criteria related to the social, environmental, and economical factors. The LCA analysis utilized the daily distance covered by collection trucks among the 5 selected landfill sites to generate inventory data on total energy usage for each landfill sites. The planning and selection of the potential sites were facilitated after conducting environmental impact analysis upon the inventory data which showed the least environmental impact. (author)

  9. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  10. Site and facility waste transportation services planning documents

    International Nuclear Information System (INIS)

    Ratledge, J.E.; Schmid, S.; Danese, L.

    1991-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and maintenance of Site- and Facility-Specific Transportation Services Planning Documents (SPDs) and Site-Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities, with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations

  11. Site scientific mission plan for the southern great plains CART site January-June 2000.; TOPICAL

    International Nuclear Information System (INIS)

    Peppler, R. A.; Sisterson, D. L.; Lamb, P.

    2001-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 2000, and looks forward in less detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team[DSIT], Operations Team, and Instrument Team[IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding. With this issue, many aspects of earlier Site Scientific Mission Plan reports have been moved to ARM sites on the World Wide Web. This report and all previous reports are available on the SGP CART web site

  12. Paraho oil shale module. Site development plan, Task 4

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    A management plan and schedule which covers all requirements for gaining access to the site and for conducting a Paraho Process demonstration program have been prepared. The oil shale available should represent a regional resource of suitable size and quality for commercial development. Discussed in this report are: proof of ownership; requirements for rights-of-way for access to the site; local zoning restrictions; water rights; site availability verification; and other legal requirements. (DMC)

  13. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  14. Proposed Site Treatment Plan (PSTP). STP reference document

    International Nuclear Information System (INIS)

    1995-01-01

    The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP

  15. Site scientific mission plan for the Southern Great Plains CART site: January 1997--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Institute for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States)

    1997-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  16. Site scientific mission plan for the southern Great Plain CART site July-December 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, P.J.; Peppler, R.A.; Sisterson, D.L.

    1997-08-28

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  17. The Planetary Collegium: Master Plan for a Distributed Mixed Reality Campus

    Directory of Open Access Journals (Sweden)

    Peter Anders

    2012-10-01

    Full Text Available This paper describes the design for a Mixed Reality campusfor the Planetary Collegium. The Collegium is an international research network centered at Plymouth, U.K. Its plans call for seven sub-centers, or nodes, to be builtin different parts of the world. These nodes would be linked by shared virtual spaces and digital networks. The paper describes how the Collegium’s seeming contradictions (distributed/unified, simulated/physical, local/remote can be reconciled. The resulting project is a mixed reality that transcends scales from global to local and, ultimately, to the constituent buildings and their digital spaces.

  18. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  19. Site scientific mission plan for the southern Great Plains CART site, January--June 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. The primary purpose of this site scientific mission plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team, Operations Team, and Instrument Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the Site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  20. Fiscal 2000 survey report. Foundation building project for international energy use rationalization. Master plan preparation for rationalized energy use; 2000 nendo kokusai energy shiyo gorika kiso seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For energy conservation and environmental protection using technologies for effective consumption of energy and for preventing pollution due to energy consumption, master plans were studied and prepared on photovoltaic power generation, wind power generation, natural gas utilization, and so on, for the Xinjiang Uygur Zizhiqu, Gansu Province, and Guandong Province, respectively. Propositions addressing the Xinjiang Uygur Zizhiqu involved a decrease in dependence on coal, utilization of natural gas, introduction of coal-fired cogeneration systems, introduction of wind power up to the level equivalent to the supply reserve capability, energy conversion and new industry development using natural gas, promotion of electrification of local communities, and so on. Propositions addressing Gansu Province involved the hydroelectric power system as the core of power sources, decrease in dependence on coal, enhanced utilization of natural gas, energy conversion and new industry development utilizing natural gas, and so on. Propositions addressing Guangdong Province involved a decrease in dependence on coal and oil, enhanced utilization of natural gas, introduction of natural gas-fired combined cycle power generation into urban sectors, accelerated utilization of wind power generation on isolated islands, and so on. (NEDO)

  1. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  2. EXPLORATION ON TECHNICAL REFORM OF STRATEGIC PLANNING AND URBAN MASTER PLANNING THROUGH THE ANALYSIS ON THEIR RELATIONSHIP%从战略规划与总体规划关系探讨两者技术改革

    Institute of Scientific and Technical Information of China (English)

    赵艳莉; 郑声轩; 张卓如

    2012-01-01

    Through the comparative analysis on the concept features and technical contents of strategic planning and master planning, this paper analyzes the types of urban strategic planning and clarifies the status and role of strategic planning in the planning system of China. Through the case study on the interaction between strategic planning and master planning, the paper elaborates their mutual supporting and complementary relationship, and points out that emphasizing the differentiated development of these two kinds of planning is favorable for the technical progress of planning, and that strategic planning should focus on goal guidance and master planning should strengthen the comprehensive control.%比较分析了战略规划与总体规划的概念特征及技术内容,并梳理城市发展战略规划的几种类型,认识战略规划在我国规划体系中的地位、作用.通过战略规划与总体规划互动的规划案例阐明两者互为支撑、互为补充的关系,提出强调两者的差异化发展有利于规划技术进步,战略规划应突出目标引导性,总体规划应加强综合控制性.

  3. Site scientific mission plan for the Southern Great Plains CART site: July--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1997-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  4. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  5. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE's repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab

  6. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  7. Socioeconomic monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the SMMP is to document compliance with the NWPA. In order to do so, a summary description of site characterization activities based on the consultation draft of the Site Characterization Plan and the final EA is provided. Subsequent chapters identify issues related to the potential for significant adverse impacts and the monitoring plans proposed to determine whether those impacts occur. Should monitoring confirm the potential for significant adverse impact, mitigative maesures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicable, any significant adverse environmental impacts. Proposed site characterization activites involve a variety of surface and subsurface activities including site preparation, access road construction and improvment, exploratory drilling and testing, geophysical surveys, geological mapping, and construction of the exploratory shaft facility. It is not anticipated that any significant adverse socioeconomic impacts will result form any of the proposed site characterization activities. However, the assessment of impacts in the EA, especially impacts related to employment and population growth, was based on assumptions concerning activities and conditions during the site characterization phase

  8. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  9. Land use planning and chemical sites. Summary report

    DEFF Research Database (Denmark)

    Grønberg, Carsten D.

    2000-01-01

    A methodology for land-use planning involving chemical sites has been developed for making decisions in local and regional administrations. The methodology treats land-use planning as a multi criteria decision and structures the planning process in sevensteps, where one can loop through the steps...... several times. Essential for the methodology is the specification of objectives setting the frame in which the alternatives are assessed and compared. The complete list of objectives includes the followingitems: safety and accidents, public distortion and health, environmental impact, cultural and natural...

  10. Hanford site pollution prevention plan progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kirkendall, J.R.

    1996-08-26

    This report tracks progress made during 1995 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307,`Plans,` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, `Waste Reduction,` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in- process reuse or reclamation of valuable spent material.

  11. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  12. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  13. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  14. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  15. Sustainable Impact of Landfill Siting towards Urban Planning in Malaysia

    Science.gov (United States)

    Sin Tey, Jia; Goh, Kai Chen; Ern Ang, Peniel Soon

    2017-10-01

    Landfill is one of the most common, widely used waste management technique in Malaysia. The ever increasing of solid waste has made the role of landfill become prominent despite the negative impacts that caused by the landfill is unavoidable. The public and government regulations are getting more aware with the negative impacts that could be brought by the landfill towards the community. It led to the cultural shift to integrate the concept of sustainability into the planning of siting a landfill in an urban area. However, current urban planning tends to emphasize more on the environmental aspect instead of social and economic aspects. This is due to the existing planning guidelines and stakeholder’s understandings are more on the environmental aspect. This led to the needs of incorporating the concept of sustainability into the urban planning. Thus, this paper focuses on the industry stakeholders view on the negative impacts that will cause by the landfill towards the urban planning. The industry stakeholders are those who are related to the decision-making in the selection of a landfill site in the government department. The scope of the study is within the country of Malaysia. This study was conducted through the semi-structured interviews with a total of fifteen industry stakeholders to obtain their perspective on the issues of impacts of siting a landfill in the urban area. The data obtained was analysed using the software, QSR NVivo version 10. Results indicate that landfill bought significant sustainability-related impacts towards landfill siting in urban planning. The negative impacts stated by the respondents are categorized under all three sustainable aspects such as environmental, social and economic. Among the results are such as the pollution, such as the generation of leachate, the objection in siting a landfill site against by the public, and the negotiating and getting money contribution from local authorities. The results produced can be served

  16. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  17. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  18. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  19. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  20. 10 CFR 60.17 - Contents of site characterization plan.

    Science.gov (United States)

    2010-01-01

    ....17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN... radioactive waste; (iv) Plans to control any adverse impacts from such site characterization activities that...-level radioactive waste to be emplaced in such geologic repository, a description (to the extent...

  1. Draft Site Treatment Plan (DSTP), Volumes I and II

    International Nuclear Information System (INIS)

    D'Amelio, J.

    1994-01-01

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state's input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only

  2. Livermore Site Spill Prevention, Control, and Countermeasures Plan, May 2017

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-05-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil.

  3. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans,'' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction,'' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD

  4. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ``Plans,`` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ``Waste Reduction,`` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

  5. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  6. Plan for addressing issues relating to oil shale plant siting

    Energy Technology Data Exchange (ETDEWEB)

    Noridin, J. S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L. W.; James, R.; Berdan, G.

    1987-09-01

    The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

  7. Coeur d'Alene Tribe Fish, Water and Wildlife Program : Coeur d'Alene Tribe Trout Production Facility Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Peters, Ronald L.; Woodward-Lilengreen, Kelly L.; Vitale, Angelo J.

    1999-09-01

    The Northwest Power Planning Council (Council) receives and reviews proposals to mitigate for fish and wildlife losses and refers approved measures to Bonneville Power Administration (BPA) for funding. The Northwest Power Act (Act) calls on the Council to include measures in its Columbia River Basin Fish and Wildlife Program (Program) to address system-wide fish and wildlife losses. The Act further states that the Council may include in its Program measures that provide off-site mitigation--mitigation physically removed from the hydro project(s) that caused the need to mitigate. The Program includes a goal ''to recover and preserve the health of native resident fish injured by the hydropower system, where feasible, and, where appropriate, to use resident fish to mitigate for anadromous fish losses in the system.'' Among those recommended measures are off-site mitigation for losses of anadromous fisheries including the measure under analysis in this Coeur d'Alene Tribe Trout Production Facility Master Plan, proposed by the Coeur d'Alene Tribe. To meet the need for off-site mitigation for anadromous fish losses in the Columbia River Basin in a manner consistent with the objectives of the Council's Fish and Wildlife Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operations and maintenance of a trout production facility on the Coeur d'Alene Indian Reservation. Measures for establishing a Coeur d'Alene fish production facility have been a part of the Council's Program since 1987. The Coeur d'Alene Tribe Trout Production Facility is intended to rear and release westslope cutthroat trout into rivers and streams with the express purpose of increasing the numbers of fish spawning, incubating and rearing in the natural environment. It will use the modern technology that hatcheries offer to overcome the mortality resulting from habitat degradation in lakes, rivers, and

  8. Hanford Site Pollution Prevention Plan Progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan.

  9. Hanford Site Pollution Prevention Plan Progress report, 1993

    International Nuclear Information System (INIS)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan

  10. Bald eagle site management plan for the Hanford Site, south-central Washington

    International Nuclear Information System (INIS)

    Fitzner, R.F.; Weiss, S.G.

    1994-12-01

    The CERCLA remedial investigations of waste sites on the Hanford Site will involve lands containing or adjacent to a bald eagle nest, winter concentration areas, or communal night roost. Because these CERCLA investigations may affect bald eagles, the DOE has prepared this Bald Eagle Site Management Plan (BESMP). However, it is intended that this BESMP be used or updated so as to be also applicable to future activities that affect bald eagles on the Hanford Site. Bald eagles regularly use the US Department of Energy's (DOE) Hanford Site in south-central Washington State during winter months for roosting, perching, and foraging. Each of these activities requires buffer zones to protect eagles from human disturbances. Buffer zones developed in this plan follow recommended guidelines and are intended to be used in planning. If Hanford Site activities in the vicinity of identified bald eagle use areas are carried out in accordance with this plan, such actions are not likely to adversely affect the eagles or their habitat. Activities that may be exceptions will involve informal or formal (whichever is appropriate) consultation with the US Fish and Wildlife Service as required by the Endangered Species Act

  11. Unlocking the electric mobility potential of Toronto: moving toward an electric mobility master plan for the city

    International Nuclear Information System (INIS)

    Gleeson, A.; Scratch, K.

    2010-10-01

    This report is an analysis of the current state of electric transportation and its potential integration in the transportation system of the city of Toronto. In this document, electric vehicles include every mode of transport involving the use of energy drawn from the electricity grid, such as plug-in hybrid electric vehicles (PHEV), extended range electric vehicles (EREV), battery electric vehicles (BEV), grid connected transit vehicles and electrified locomotives. An overview of the movement of people and goods, including the consideration of patterns of commuting and modes of transportation, is provided in the first section of this document. It has been demonstrated that most of the trips taking place in the city correspond to the predicted operating range of many EVs. Section one also provides a description of the local electricity grid system serving Toronto neighbourhoods and of the sources and movements of air contaminants. It gives a evaluation of the state of EV technologies and analyzes the economic and social factors that have an impact on the public perceptions regarding these technologies. Current policies and programs designed to promote market adoption of EVs around the world are outlined in the conclusion of this section. A simulation work was performed through a collaborative work with Toronto Hydro Electric System Limited in order to analyze the consequences of different EV charging scenarios on the electricity grid system. The results of this simulation are described in section two of the report. The document also presents the outcomes of the workshop on the implementation of an electric mobility master plan held in Toronto in April, 2010. 176 refs.

  12. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  13. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  14. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), authorizes the Department of Energy (DOE) to undertake remedial actions at 24 DOE designated processing sites. The term ''processing site,'' by statutory definition, means the inactive uranium mill or processing site and any other real property or improvement which is in the vicinity of the mill or processing site and is determined to be contaminated with residual radioactive materials derived from the mill or processing site. For purposes of this document, the inactive mill or processing site is referred to as the ''processing site'' and the other real property or improvement in the vicinity of such site is referred to as a 'vicinity property.'' The purpose of the remedial actions is to stabilize and control the uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner. Remedial actions undertaken by DOE are to be accomplished: With the full participation of the affected states and Indian tribes, in accordance with standards issued by the Environmental Protection Agency (EPA), and with the concurrence of the Nuclear Regulatory Commission (NRC). This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. 5 refs., 1 tab

  15. Strategic plan for Hanford Site Environmental Restoration Information Management

    International Nuclear Information System (INIS)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  16. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-05-01

    The Hanford Site WMin/P2 program is an organized, comprehensive, and continual effort to systematically reduce the quantity and toxicity of hazardous, radioactive, mixed, and sanitary wastes; conserve resources; and prevent or minimize pollutant releases to all environmental media from all Site activities. The Hanford Site WMin/P2 program plan reflects national and DOE waste minimization and pollution prevention goals and policies, and represents an ongoing effort to make WMin/P2 part of the Site operating philosophy. In accordance with these policies, a hierarchical approach to environmental management has been adopted and is applied to all types of polluting and waste generating activities. Pollution prevention and waste minimization through source reduction are first priority in the Hanford WMin/P2 program, followed by environmentally safe recycling. Treatment to reduce the quantity, toxicity, and/or mobility will be considered only when prevention or recycling are not possible or practical. Environmentally safe disposal is the last option

  17. Site Study Plan for Acoustics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Acoustics site study plan describes a field program which characterizes existing sound levels, determines the area's sound propagation characteristics, and monitors the project-related sound emissions. The plan describes for each study: the need for the study, study design, data management and use, schedule, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Requirements Document. 37 refs., 9 figs., 3 tabs

  18. Hanford site post-NPH building inspection plan

    International Nuclear Information System (INIS)

    Wagenblast, G.R. Westinghouse Hanford

    1996-01-01

    This plan establishes consistent post-NPH building inspection procedures and defines a procedure for prioritization of buildings for inspection to ensure the safety of facilities prior to reentry. Qualification of systems for restart of operation is not included. This plan takes advantage, where possible, of existing national procedures for post-NPH inspection of buildings, of existing structural design and evaluation documentation of Hanford facilities, and current and proposed seismic instrumentation located throughout the Hanford site. A list of buildings, prioritized according to current building safety function and building vulnerability (without regard for or information about a damaging natural forces event) is provided

  19. Decommissioning Planning for Nuclear Units at the Oskarshamn Site

    International Nuclear Information System (INIS)

    Rannemalm, Thom; Eriksson, Joergen; Bergh, Niklas

    2016-01-01

    This paper will describe the process that OKG is now in and how the regulatory framework in Sweden is set out with EIA preparation, SAR updates, decommissioning plans etc. and how OKG plans to meet some of the challenges that need to be considered in front of the decommissioning. There will be a discussion on which strategic decisions will have priority and why. The paper will also discuss some of the difficulties with having a site with two units in decommissioning and one unit in power operation. (authors)

  20. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  1. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  2. Groundwater well services site safety and health plan

    International Nuclear Information System (INIS)

    Tuttle, B.G.

    1996-08-01

    This Site Specific Health and Safety Plan covers well servicing in support of the Environmental Restoration Contractor Groundwater Project. Well servicing is an important part of environmental restoration activities supporting several pump and treat facilities and assisting in evaluation and servicing of various groundwater wells throughout the Hanford Site. Remediation of contaminated groundwater is a major part of the ERC project. Well services tasks help enhance groundwater extraction/injection as well as maintain groundwater wells for sampling and other hydrologic testing and information gathering

  3. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  4. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  5. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. Its applicability covers 24 inactive uranium mill tailings sites and approximately 8000 vicinity properties, no two of which are alike. This diversity dictates the more general approach of this plan. In practice, however, site-specific application will be implemented and will require extensive consultation with the appropriate state or tribe and the NRC. In addition, information concerning relevant Federal, state, or tribal standards and regulations will be considered along with any data that may assist in the evaluations. Throughout this process, DOE will encourage state and tribal participation to ensure that compliance with the EPA standards will be achieved

  6. Integrated planning for nuclear siting - The South African experience

    Energy Technology Data Exchange (ETDEWEB)

    Hobbs, J C.A.; Heidstra, N; Graupner, O F [Eskom, Johannesburg (South Africa); Hambleton-Jones, B [Atomic Energy Corporation of South Africa Ltd., Pellindaba, Pretoria (South Africa)

    1990-06-01

    This paper describes the process involved in the current national programme to identify potential sites for nuclear power development in South Africa. A description is given of the sensitivity studies - the evaluation of the potential perturbations to and opportunities for the biophysical and socioeconomic environments and the suitability studies - the evaluation of environmental influences on geotechnical, safety and financial considerations. This programme is divorced from any decision of whether or not to build further nuclear power station in South Africa. The programme described is a long range land-use planning exercise considered expedient in the face of competition for land that share similar requirements as those of nuclear power station sites. It is also designed to streamline nuclear power station lead times and to make national and regional planners aware of Eskom's requirements in the drafting of their policies and plans. (author)

  7. Integrated planning for nuclear siting - The South African experience

    International Nuclear Information System (INIS)

    Hobbs, J.C.A.; Heidstra, N.; Graupner, O.F.; Hambleton-Jones, B.

    1990-01-01

    This paper describes the process involved in the current national programme to identify potential sites for nuclear power development in South Africa. A description is given of the sensitivity studies - the evaluation of the potential perturbations to and opportunities for the biophysical and socioeconomic environments and the suitability studies - the evaluation of environmental influences on geotechnical, safety and financial considerations. This programme is divorced from any decision of whether or not to build further nuclear power station in South Africa. The programme described is a long range land-use planning exercise considered expedient in the face of competition for land that share similar requirements as those of nuclear power station sites. It is also designed to streamline nuclear power station lead times and to make national and regional planners aware of Eskom's requirements in the drafting of their policies and plans. (author)

  8. Site Support Program Plan for ICF Kaiser Hanford Company

    International Nuclear Information System (INIS)

    Benedetti, R.L.

    1994-10-01

    This document describes the Hanford Reservation site support program plan for each support division, in terms of safety, environmental concerns, costs, and reliability. Support services include the following: Piped Utilities; Electrical utilities; transportation; Energy management; General Administration Support Buildings; electrical safety upgrades. Contained in this Volume II is information covering the following: Operations and maintenance Utilities; Piped Utilities; Water systems Administration and Sampling; electrical utilities

  9. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  10. Site Support Program Plan for ICF Kaiser Hanford Company

    International Nuclear Information System (INIS)

    Benedetti, R.L.

    1994-10-01

    This document describes the Hanford Reservation site support program plan for each support division, in terms of safety, environmental concerns, costs, and reliability. Support services include the following: Piped Utilities; Electrical utilities; transportation; Energy management; General Administration Support Buildings; electrical safety upgrades. This Volume III discusses Operations and Maintenance Transportation and the Transportation Department including fleet maintenance, railroad operations and track maintenance, bus operations, solid waste disposal, special delivery services, and road maintenance

  11. Yucca Mountain Site Characterization Project Waste Package Plan

    International Nuclear Information System (INIS)

    Harrison-Giesler, D.J.; Jardine, L.J.

    1991-02-01

    The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig

  12. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  13. Livermore Site Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-21

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

  14. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    International Nuclear Information System (INIS)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-01-01

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information

  15. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  16. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  17. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  18. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  19. Monitoring plan for characterization of the Building 3019 leak site

    International Nuclear Information System (INIS)

    1986-06-01

    The Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program to provide comprehensive management of areas where past research, development, and waste management activities have resulted in residual contamination of facilities or the environment. In the winter of 1985, elevated levels of strontium-90 were detected in White Oak Creek and the ORNL sewage treatment plant. A leak was subsequently identified in a low-level waste transfer line north of Building 3019. The period of leakage and the exact chemical composition of the effluent are unknown. Two dye tests conducted at the leak site have identified several possible pathways for contaminant migration. The discovery of a solution cavity in the Chickamauga bedrock underlying the leak site and the rapid appearance of dye in the sump at Building 3042 indicate the extension of the cavity system along strike to the east. This report outlines the available published and unpublished background information pertaining to the site and proposes a monitoring plan consisting of soil sample collection and monitor well installation to provide a preliminary assessment of the types and extent of contamination at the leak site. The plan is also designed to provide additional geologic and hydrologic data for evaluating possible contaminant migration pathways. 6 refs., 10 figs., 1 tab

  20. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  1. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs

  2. Site study plan for routine laboratory rock mechanics, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for Routine Laboratory Rock Mechanics describes routine laboratory testing to be conducted on rock samples collected as part of the characterization of the Deaf Smith County site, Texas. This study plan describes the early laboratory testing. Additional testing may be required and the type and scope of testing will be dependent upon the results of the early testing. This study provides for measurements of index, hydrological, mechanical, and chemical properties with tests which are standardized and used widely in geotechnical investigations. Another Site Study Plan for Nonroutine Laboratory Rock Mechanics describes laboratory testing of samples from the site to determine mechanical, thermomechanical, and thermal properties by less widely used methods, many of which have been developed specifically for characterization of the site. Data from laboratory tests will be used for characterization of rock strata, design of shafts and underground facilities, and modeling of repository behavior in support of resolution of both preclosure and postclosure issues. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 8 figs., 3 tabs

  3. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  4. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  5. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  6. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  7. Spatial Analysis of Urban Master Plans of Towns in North-Eastern Poland in the Context of Urban Revalorisation

    Science.gov (United States)

    Zagroba, Marek; Klopotowski, Maciej

    2017-12-01

    The research subject raised in this study is the urban structure of small towns in Warmia, a region rich in history, situated in the north-eastern Poland. This area, together with the neighbouring region of Mazury, is referred to as the Land of a Thousand Lakes. The historical events, such as the conquest of this territory by the Teutonic Order in 13th century, gave rise to the foundation of twelve towns in Warmia, which have survived until our time. Of these settlements, only one, which is Olsztyn, grew to a larger size over the centuries and eventually became the capital of Warmia. The others are still small towns, with a population from a few to less than twenty thousand inhabitants. The policy and economic goals of the Teutonic Order underlay the spread of a uniform type of urban master plan in the entire region. The establishment of urban centres was dictated by military considerations - all towns had fortified castles and were 15-30 km distant from one another, which stemmed from the organisation of the Teutonic State. The location of new towns in Warmia coincided in time with the general urban planning principles governing urban development in the Middle Ages. The medieval towns, which grew on the foundations of ancient cultures, were developed on a regular grid of streets, delineating land lots for compact town houses and a central square serving as a market place. Within this structure, the town’s most significant spatial dominants, such as a town hall, a church and a fortified castle, were situated. The castle often stood on the outskirts of a town, as it had to be connected to the town’s fortifications. The location of medieval towns in Warmia proceeded according to a similar concept. All these towns are distinguished by characteristically medieval, regular urban layouts, which - while being similar - have certain intrinsic features. Differences can be seen in the design of main streets, the size and proportions of market squares, the ways in which

  8. State of Nevada comments on the US Department of Energy site characterization plan, Yucca Mountain site, Nevada

    International Nuclear Information System (INIS)

    1989-09-01

    In December 1988, the US Department of Energy issued a Site Characterization Plan (SCP) for the Yucca Mountain site, as required by Section 113 of the Nuclear Waste Policy Act of 1982 (NWPA). The purpose of site characterization is to develop sufficient information to support a determination of the suitability, or lack of suitability of the site to safely isolate high-level radioactive waste with reasonable certainty for thousands of years. The purpose of the Site Characterization Plan is to describe plans for obtaining sufficient information about the site, plans for mitigation of any adverse impacts occurring from site characterization activities, and plans for decontamination and decommissioning of the site if it is determined not to be suitable for a repository. Part I presents an overview of the State's comments. The overview takes the form of general concerns and comments organized by specific areas of concern. The overview does not follow the format of the SCP

  9. Hanford Site physical separations CERCLA treatability test plan

    International Nuclear Information System (INIS)

    1992-03-01

    This test plan describes specifications, responsibilities, and general procedures to be followed to conduct a physical separations soil treatability test in the North Process Pond of the 300-FF-1 Operable Unit at the Hanford Site, Washington. The objective of this test is to evaluate the use of physical separation systems as a means of concentrating chemical and radioactive contaminants into fine soil fractions and thereby minimizing waste volumes. If successful the technology could be applied to clean up millions of cubic meters of contaminated soils in waste sites at Hanford and other sites. It is not the intent of this test to remove contaminated materials from the fine soils. Physical separation is a simple and comparatively low cost technology to potentially achieve a significant reduction in the volume of contaminated soils. Organic contaminants are expected to be insignificant for the 300-FF-I Operable Unit test, and further removal of metals and radioactive contaminants from the fine fraction of soils will require secondary treatment such as chemical extraction, electromagnetic separation, or other technologies. Additional investigations/testing are recommended to assess the economic and technical feasibility of applying secondary treatment technologies, but are not within the scope of this test. This plan provides guidance and specifications for the treatability test to be conducted as a service contract. More detailed instructions and procedures will be provided as part of the vendors (sellers) proposal. The procedures will be approved by Westinghouse Hanford Company (Westinghouse Hanford) and finalized by the seller prior to initiating the test

  10. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  11. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  12. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  13. Off-site emergency planning in Czech Republic

    International Nuclear Information System (INIS)

    Prouza, Z.; Drabova, D.

    1996-01-01

    In the Czech Republic, the NPP Dukovany - PWR 440/213-type (4 blocks) is currently in operation (from 1985) and NPP Temelin - PWR 1000 (2 blocks) is under construction. Radiation accident on the NPP is defined as an unexpected or unintentional event in a facility with a potential of off-site consequences. The principles of emergency planning in Czech Republic now are based on the philosophy and principles described in the ICRP Publication 40 and the IAEA Safety Series No. 55, 72, and includes already the post Chernobyl experiences. Nevertheless, Czech Republic legislation experiences an extensive reconstruction. The Atomic Act, which will be based from point of view the structure, philosophy and principles on new International Basic Safety Standards, already being elaborated. That acts and related laws should solve our legislative problems on field of emergency planning and preparedness

  14. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Operational Area Monitoring Plan for environmental monitoring, is for EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) which operates several offsite facilities in support of activities at the Nevada Test Site (NTS). These facilities include: (1) Amador Valley Operations (AVO), Pleasanton, California; (2) Kirtland Operations (KO), Kirtland Air Force base, Albuquerque, New Mexico (KAFB); (3) Las Vegas Area Operations (LVAO), Remote Sensing Laboratory (RSL), and North Las Vegas (NLV) Complex at Nellis Air Force Base (NAFB), North Las Vegas, Nevada; (4) Los Alamos Operations (LAO), Los Alamos, New Mexico; (5) Santa Barbara Operations (SBO), Goleta, California; (6) Special Technologies Laboratory (STL), Santa Barbara, California; (7) Washington Aerial Measurements Department (WAMD), Andrews Air Force Base, Maryland; and, (8) Woburn Cathode Ray Tube Operations (WCO), Woburn, Massachusetts. Each of these facilities has an individual Operational Area Monitoring Plan, but they have been consolidated herein to reduce redundancy

  15. Environmental Monitoring and Mitigation Plan for site characterization:

    International Nuclear Information System (INIS)

    1988-01-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with the letter and the spirit of applicable environmental statues and regulations. This document - the NNWSI Project's Environmental Regulatory Compliance Plan (ERCP) - is one means of implementing the policy. The ERCP describes the plan by which the NNWSI Project Office will comply with applicable environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statues and regulations. To achieve the goals of DOE, the ERCP will be developed in phases. This version of the ERCP is the first phase in this development. It represents the NNWSI Project's understanding of environmental regulatory requirements for site characterization of Yucca Mountain. After consultation with appropriate Federal and State agencies, the ERCP will be updated to reflect the results of these consultations. 29 figs., 1 tab

  16. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  17. Sustainable land use planning at the Semipalatinsk Nuclear Test Site

    International Nuclear Information System (INIS)

    Coughtrey, P.J.; Ridgway, R.B.; Baumann, P.

    2001-01-01

    Full text: The UK Department for International Development (DFID) has recently agreed to support a project to develop a participatory sustainable land use plan for areas affected by nuclear weapons testing at Semipalatinsk. This three year project is expected to be initiated in April 2001 and will form one component of the United Nations Development Programme (UNDP) Semipalatinsk Rehabilitation Programme. The project will be undertaken by a combination of Kazakh organizations working with UK consultants and will meet its overall aim through the following main activities: Development of institutional capacity in data management and analysis; Provision of information and education on environmental contamination, hazards and risks; Development of a participatory land use planning process and piloting of the process in specific areas and communities around the test site; Integration of mineral resource extraction in the land planning process with a focus- on water resource and environmental protection and participatory approaches to resolving land use conflicts; Development of legislative tools to permit the implementation of environmental management of resource exploitation. The project will make use of both modern satellite-based imagery and more traditional methods to determine the potential for different land uses within the test site. The results obtained will be incorporated with additional information on land use. radiological and hydrological conditions at the test site through a geographical information system (GIS) provided by the project. The GIS will form the core component for collation and distribution of information on options available for use of different areas of the test site and its vicinity. A participatory rural appraisal, using tried and tested techniques, will identify local interest groups in land use planning and identify the details of their stake in the process. The groups will include owners-herders, employee-herders, and subsistence

  18. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  19. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  20. Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, Ruben P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, Wendy [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-04

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  1. LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, R. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-14

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  2. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2018-03-01

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR

  3. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  4. Siting of the Swedish deep geological repository - experiences and plans

    International Nuclear Information System (INIS)

    Eng, T.; Backblom, G.; Thegerstrom, C.; Ahlbom, K.; Leijon, B.

    1996-01-01

    The paper provides a brief overview of the Swedish siting programme for a deep repository. A stepwise process is a key element in the planning and implementation of deep disposal of long-lived waste in Sweden. The local siting work is made in cooperation with the affected and concerned municipalities. The programs, decisions and results that so far have been reported and ongoing feasibility studies is a solid platform for the continuing siting work. It can be noted that the siting work in some cases has caused heavy opposition and negative opinions. Careful considerations on how to proceed to develop the necessary background material must therefore be made. The Environmental Impact Assessment (EIA) process that has started in conjunction with feasibility studies are judged to play an important role in the future. In this process, with extensive local involvement, critical issues can be detected at an early stage and sound ideas on both the process itself and on technical issues can be incorporated. To facilitate information exchange and cooperation between the municipalities involved and to coordinate liaison between the municipalities and county administrative boards affected by the studies, the Swedish government has appointed a National Coordinator for nuclear waste disposal. The government also has decided to provide the concerned municipalities with funding for their participation in the process. (author)

  5. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  6. Savannah River Site plan for performing maintenance in Federal Facility Agreement areas (O and M Plan)

    International Nuclear Information System (INIS)

    Morris, D.R.

    1996-01-01

    The Savannah River Site was placed on the National Priority List (NPL) in December 1989 and became subject to comprehensive remediation in accordance with CERCLA. The FFA, effective August 16, 1993, establishes the requirements for Site investigation and remediation of releases and potential releases of hazardous substances, and interim status corrective action for releases of hazardous wastes or hazardous constituents. It was determined that further direction was needed for the Operating Departments regarding operation and maintenance activities within those areas listed in the FFA. The Plan for Performing Maintenance (O and M Plan) provides this additional direction. Section 4.0 addresses the operation and maintenance activities necessary for continued operation of the facilities in areas identified as RCRA/CERCLA Units or Site Evaluation Areas. Certain types of the O and M activity could be construed as a remedial or removal action. The intent of this Plan is to provide direction for conducting operation and maintenance activities that are not intended to be remedial or removal actions. The Plan identifies the locations of the units and areas, defines intrusive O and M activities, classifies the intrusive activity as either minor or major, and identifies the requirements, approvals, and documentation necessary to perform the activity in a manner that is protective of human health and the environment; and minimizes any potential impact to any future removal and remedial actions

  7. NRC staff site characterization analysis of the Department of Energy`s Site Characterization Plan, Yucca Mountain Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-08-01

    This Site Characterization Analysis (SCA) documents the NRC staff`s concerns resulting from its review of the US Department of Energy`s (DOE`s) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation`s first geologic repository for high-level radioactive waste. DOE`s SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC`s specific objections related to the SCP, and major comments and recommendations on the various parts of DOE`s program, are presented in SCA Section 2, Director`s Comments and Recommendations. Section 3 contains summaries of the NRC staff`s concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE`s program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC`s responsibilities with respect to DOE`s SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs.

  8. NRC staff site characterization analysis of the Department of Energy's Site Characterization Plan, Yucca Mountain Site, Nevada

    International Nuclear Information System (INIS)

    1989-08-01

    This Site Characterization Analysis (SCA) documents the NRC staff's concerns resulting from its review of the US Department of Energy's (DOE's) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation's first geologic repository for high-level radioactive waste. DOE's SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC's specific objections related to the SCP, and major comments and recommendations on the various parts of DOE's program, are presented in SCA Section 2, Director's Comments and Recommendations. Section 3 contains summaries of the NRC staff's concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE's program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC's responsibilities with respect to DOE's SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs

  9. Research report for fiscal 1998. Basic research for promoting joint implementation, etc. (master plan for changing district heating boilers, Nizhniy Novgorod province); 1998 nendo chosa hokokusho. Nizhniy Novgorod shu chiiki danboyo boiler tenkan master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The above-named plan aims to reduce greenhouse gas emissions and enhance energy efficiency. The above-named Russian system for supplying heat and hot water is operated by the 51 local governments in the province, with boiler houses sited at 4047 locations. Almost all of them are approximately 30 years old, low in thermal efficiency because of their obsolete design and structure, costly because of their old parts and components wanting repair, and higher in fuel cost than those fired by natural gas. It is indispensable to replace the existing boilers with natural gas-fired boilers, and it is estimated that there are 4511 boilers that require such replacement. When the heat supply business operated by the local governments is modernized, the CO2 gas emission will be reduced by approximately 2.675-million tons/year. As for energy efficiency, it is found that replacement by heavy oil-fired boilers is the highest in terms of the effect of investment. (NEDO)

  10. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update (U)

    International Nuclear Information System (INIS)

    Lawrence, B.; Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information

  11. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    Science.gov (United States)

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  12. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  13. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  14. Site Study Plan for laboratory soil mechanics, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for laboratory soil mechanics describes the laboratory testing to be conducted on soil samples collected as part of the characterization of the Deaf Smith County site, Texas. This study provides for measurements of index, mechanical, thermal, hydrologic, chemical, and mineral properties of soils from boring throughout the site. Samples will be taken from Playa Borings/Trenching, Transportation/Utilities Foundation Borings, Repository Surface Facilities Design Foundation Borings, and Exploratory Shaft Facilities Design Foundation Borings. Data from the laboratory tests will be used for soil strata characterization, design of foundations for surface structures, design of transportation facilities and utility structures, design of impoundments, design of shaft lining, design of the shaft freeze wall, shaft permitting, performance assessment calculations, and other program requirements. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 6 figs., 3 tabs

  15. Site characterization plan overview: reference repository location, Hanford Site, Washington: Consultation draft: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    As part of the process for siting the nation's first geologic repository for radioactive waste, the Department of Energy (DOE) is preparing a site characterization plan for the Hanford site in Benton County, Washington. As a step in the preparation of that plan, the DOE has provided, for information and review, a consultation draft of the plan to the State of Washington, the affected Indian Tribes - the Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Indian Tribe, and the Yakima Indian Nation - and the US Nuclear Regulatory Commission. The Hanford site is one of three sites that the DOE currently plans to characterize;the other sites are the Deaf Smith County site in Texas and the Yucca Mountain site in Nevada. After site characterization has been completed and its results evaluated, the DOE will identify from among the three characterized sites the site that is preferred for the repository. The overview presented here consists of brief summaries of important topics covered in the consulation draft of the site characterization plan;it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with breif descriptions of the dispoal system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Hanford site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization

  16. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  17. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  18. The "Virtual Face" of Planning: How to Use Higher Education Web Sites to Assess Competitive Advantage

    Science.gov (United States)

    Meyer, Katrina A.; Wilson, Jeffery L.

    2010-01-01

    The research presented in this article demonstrates how to investigate the competitive position of an institution's academic programs or services through an analysis of the Web sites of other higher education institutions. By using information from research/doctoral, master's, baccalaureate, and community colleges across 40 states, this study…

  19. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  20. Atmospheric photochemical reactivity and ozone production at two sites in Hong Kong: Application of a Master Chemical Mechanism-photochemical box model

    Science.gov (United States)

    Ling, Z. H.; Guo, H.; Lam, S. H. M.; Saunders, S. M.; Wang, T.

    2014-09-01

    A photochemical box model incorporating the Master Chemical Mechanism (v3.2), constrained with a full suite of measurements, was developed to investigate the photochemical reactivity of volatile organic compounds at a semirural site (Mount Tai Mo Shan (TMS)) and an urban site (Tsuen Wan (TW)) in Hong Kong. The levels of ozone (O3) and its precursors, and the magnitudes of the reactivity of O3 precursors, revealed significant differences in the photochemistry at the two sites. Simulated peak hydroperoxyl radical (HO2) mixing ratios were similar at TW and TMS (p = 0.05), while the simulated hydroxyl radical (OH) mixing ratios were much higher at TW (p TMS, but at TW, both HCHO and O3 photolyses were found to be major contributors. By contrast, radical-radical reactions governed HOx radical losses at TMS, while at TW, the OH + NO2 reaction was found to dominate in the morning and the radical-radical reactions at noon. Overall, the conversion of NO to NO2 by HO2 dictated the O3 production at the two sites, while O3 destruction was dominated by the OH + NO2 reaction at TW, and at TMS, O3 photolysis and the O3 + HO2 reaction were the major mechanisms. The longer OH chain length at TMS indicated that more O3 was produced for each radical that was generated at this site.

  1. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  2. Put in value of the Santa Teresa Park as a cultural landscape. Project and Ordinance of the Landscape in the General Guidelines of its Master Plan

    Directory of Open Access Journals (Sweden)

    Nair Rosana Sommaruga Montiel

    2018-03-01

    Full Text Available The paper is a summary of the landscape studies developed in the framework of 'Lineamientos generales para el Plan Director del Parque Santa Teresa' (General guidelines for Santa Teresa Park Master Plan, agreement made between the Ministry of Tourism, and the Faculty of Architecture, Design And Urbanism of the University of the Republic between August 2015 and July 2016. The purpose of the Convention is to position the Santa Teresa Park as a "model park" for Uruguay, putting in value its patrimonial, landscape and Environmental characteristics, thus contributing to its tourism and sociocultural promotion. The entire project includes and combines different disciplinary studies as well as external contributions. The Research program “Landscape and Public Space” from the Institute of Design in collaboration with VIDIALAB develops the Characterization and Landscape Assessment of the Park, through studies and proposals on its landscape structures, sociocultural perceptions and the qualification of the visual landscape.

  3. Master Robotic Net

    Directory of Open Access Journals (Sweden)

    Vladimir Lipunov

    2010-01-01

    Full Text Available The main goal of the MASTER-Net project is to produce a unique fast sky survey with all sky observed over a single night down to a limiting magnitude of 19-20. Such a survey will make it possible to address a number of fundamental problems: search for dark energy via the discovery and photometry of supernovae (including SNIa, search for exoplanets, microlensing effects, discovery of minor bodies in the Solar System, and space-junk monitoring. All MASTER telescopes can be guided by alerts, and we plan to observe prompt optical emission from gamma-ray bursts synchronously in several filters and in several polarization planes.

  4. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  5. Subseabed disposal: systematic application of the site qualification plan

    International Nuclear Information System (INIS)

    Shephard, L.E.; Damuth, J.E.; Hayes, D.B.; Heath, G.R.; Laine, E.P.; Leinen, M.; Tucholke, B.E.

    1982-01-01

    Two criteria, geologic stability and barrier effectiveness, form the basis of the Subseabed Disposal Program's site qualification plan to evaluate the ocean basins and identify those regions having characteristics most favorable for containment of radioactive waste. Stability criteria are used to define those regions least likely to be disturbed by tectonic forces or oceanographic changes during the lifetime of a waste repository. Barrier criteria define those lithologies most likely to form an effective barrier to the release of radionuclides. Two north Pacific regions and three north Atlantic regions (PAC I and II and ATL I, II, and III, respectively) have thus far been selected for further investigation based on the site qualification plan. The PAC I region, centered on the Shatsky Rise in the northwest Pacific, has been subdivided into areas and locations on the basis of an exhaustive review of data available in the archives of national and international agencies and institutions. Results from three locations surveyed and sampled within the PAC I region (VEMA cruise 36-12) suggest some variability in seismic reflector character and lithology, attributable partially to the effects of the North Pacific current. PAC II, located northeast of Hawaii, represents a generic study region characteristic of the Pacific pelagic, abyssal hill environment. Seismic reflection surveys and sampling indicate uniform sediment properties and processes, both laterally and vertically, within the PAC II region. Initial investigation of Regions ATL I, II, and III, located within the distal Nares abyssal plain, the distal Sohm abyssal plain, and the Cape Verde region, respectively, suggests certain smaller areas within these regions warrant more detailed study

  6. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  7. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Environmental Monitoring Plan applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this Environmental Monitoring Plan brings together in one document a description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA). The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  8. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab

  9. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  10. Site characterization plan overview: Yucca Mountain site, Nevada Research and Development Area, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    To help the public better understand both the SCP and the site characterization program, the DOE has prepared this overview and the SCP Public Handbook. The overview presents summaries of selected topics covered in the SCP; it is not a substitute for the SCP. The organization of the overview is similar to that of the SCP itself, with brief descriptions of the Yucca Mountain site, the repository, and the containers in which the waste would be packaged, followed by a discussion of the characterization program to be carried out at the Yucca Mountain site. This overview is intended primarily for those persons who want to understand the general scope and basis of the site-characterization program, the activities to be conducted, and the facilities to be constructed without spending the time necessary to become familiar with all of the technical details presented in the SCP. For the readers of the SCP, the overview will be useful as a general guide to the plan. The SCP Public Handbook is a short document that contains brief descriptions of the SCP process and the contents of the SCP. It also explains how the public can submit comments on the SCP and lists the libraries and reading rooms at which the SCP is available. 9 refs., 18 tabs.

  11. Site characterization plan overview: Yucca Mountain site, Nevada Reserch and Development Area, Nevada

    International Nuclear Information System (INIS)

    1988-12-01

    To help the public better understand both the SCP and the site characterization program, the DOE has prepared this overview and the SCP Public Handbook. The overview presents summaries of selected topics covered in the SCP; it is not a substitute for the SCP. The organization of the overview is similar to that of the SCP itself, with brief descriptions of the Yucca Mountain site, the repository, and the containers in which the waste would be packaged, followed by a discussion of the characterization program to be carried out at the Yucca Mountain site. This overview is intended primarily for those persons who want to understand the general scope and basis of the site-characterization program, the activities to be conducted, and the facilities to be constructed without spending the time necessary to become familiar with all of the technical details presented in the SCP. For the readers of the SCP, the overview will be useful as a general guide to the plan. The SCP Public Handbook is a short document that contains brief descriptions of the SCP process and the contents of the SCP. It also explains how the public can submit comments on the SCP and lists the libraries and reading rooms at which the SCP is available. 9 refs., 18 tabs

  12. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  13. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs.

  14. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs

  15. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  16. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  17. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2007-01-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  18. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  19. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1996-01-01

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE's plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan

  20. Off-site shipment request development and review plan

    International Nuclear Information System (INIS)

    1992-05-01

    On May 17, 1991, Department of Energy Headquarters (DOE-HQ) imposed a moratorium on the shipment of all Resource Conservation and Recovery Act (RCRA) hazardous and Toxic Substances Control Act (TSCA) waste to commercial treatment, storage and disposal facilities. The moratorium was imposed after it was discovered that some shipments of RCRA and TSCA waste from Department of Energy (DOE) sites contained small quantities of radioactive and special nuclear material (SNM). The shipment of these wastes has been attributed to inconsistent and possibly erroneous interpretation of DOE Orders and guidance. In an effort to clarify existing DOE Orders and guidance and establish throughout the DOE complex, June 21, 1991, DOE-HQ issued in draft the Performance Objective for Certification of Non-Radioactive Hazardous Waste. This Performance Objective was subsequently approved on November 15, 1991. The Performance Objective contains specific requirements that must be net to allow the shipment of RCRA and TSCA waste for commercial treatment, storage and disposal. On July 16, 1991, based on the initial draft of the Performance Objective, Martin Marietta Energy Systems (MMES) issued a directive which applies the Performance Objective requirements to all wastes and materials. In addition, this MMES directive imposed the requirement for a review by a Central Waste Management (CWM) Readiness Review Board (RRB). Additional DOE and MMES guidance and directives have been issued since May 17, 1991. This plan applies to all waste destined for shipment from the Portsmouth Gaseous Diffusion Plant (PORTS) to off-site commercial treatment, storage and disposal facilities, and to all materials destined for recycle, surplus and salvage

  1. Library Web Site Administration: A Strategic Planning Model For the Smaller Academic Library

    Science.gov (United States)

    Ryan, Susan M.

    2003-01-01

    Strategic planning provides a useful structure for creating and implementing library web sites. The planned integration of a library's web site into its mission and objectives ensures that the library's community of users will consider the web site one of the most important information tools the library offers.

  2. Mastering Grunt

    CERN Document Server

    Li, Daniel

    2014-01-01

    This easy-to-understand tutorial provides you with several engaging projects that show you how to utilize Grunt with various web technologies, teaching you how to master build automation and testing with Grunt in your applications.If you are a JavaScript developer who is looking to streamline their workflow with build-automation, then this book will give you a kick start in fully understanding the importance of the described web technologies and automate their processes using Grunt.

  3. Development of Design Technology on Thermal-Hydraulic Performance in Tight-Lattice Rod Bundles: I-Master Plan and Executive Summary

    Science.gov (United States)

    Ohnuki, Akira; Kureta, Masatoshi; Yoshida, Hiroyuki; Tamai, Hidesada; Liu, Wei; Misawa, Takeharu; Takase, Kazuyuki; Akimoto, Hajime

    R&D project to investigate thermal-hydraulic performance in tight-lattice rod bundles for Innovative Water Reactor for Flexible Fuel Cycle has been progressed at Japan Atomic Energy Agency in collaboration with power utilities, reactor vendors and universities since 2002. In this series-study, we will summarize the R&D achievements using large-scale test facility (37-rod bundle with full-height and full-pressure), model experiments and advanced numerical simulation technology. This first paper described the master plan for the development of design technology and showed an executive summary for this project up to FY2005. The thermal-hydraulic characteristics in the tight-lattice configuration were investigated and the feasibility was confirmed based on the experiments. We have developed the design technology including 3-D numerical simulation one to evaluate the effects of geometry/scale on the thermal-hydraulic behaviors.

  4. On-site and off-site emergency planning at Cekmece Nuclear Research and Training Centre

    International Nuclear Information System (INIS)

    Soyberk, O.A.

    1986-01-01

    An emergency plan was prepared for minimizing the consequences of any unforeseen radiation accident in Cekmece Nuclear Research and Training Centre (CNAEM) in Istanbul, Turkey. CNAEM is situated near Kucukcekmece Lake, which is about 30 km to the west of Istanbul. It includes two pool-type research reactors of 1 MW(th) and 5 MW(th). The population in the nearest inhabited areas varies from 1000 to 50,000. Accidents are classified, according to their severity, into three categories at CNAEM: (a) local emergency, (b) on-site emergency, (c) off-site emergency. During local emergency situations evacuation is not necessary. An on-site emergency situation requires the evacuation of personnel from the plant. Personnel hearing the emergency alarm should move directly to the preselected place as soon as possible. An off-site emergency is any accident that leads to widespread contamination outside the boundary. In this situation the Turkish Atomic Energy Authority and governmental authorities are notified immediately. The emergency organization group consists of: (a) Plant Superintendent, (b) Emergency Director, (c) Reactor Supervisor, (d) Senior Health Physicist, (e) Reactor Shift Operator, (f) Health Physicists. The administration building will be used as the Emergency Control Centre. The emergency teams working under the direction of the Emergency Director consist of: (a) Health Physics, (b) Fire and Rescue, (c) First Aid and Decontamination, (d) Transportation, (e) Security and Patrol. The emergency situation is evaluated in three phases at CNAEM. The first phase is the first few hours after the beginning of the accident. The second phase is between 8-10 hours or more following the first phase. The third phase is the recovery phase. The integrated doses over periods of two hours and two days are calculated according to the situation of the core, i.e. total or partial melting, and weather conditions. The results of the calculated parameters can be adapted to possible

  5. Nevada Test Site site treatment plan. Final annual update. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  6. Succession planning for the future through an academic-practice partnership: a nursing administration master's program for emerging nurse leaders.

    Science.gov (United States)

    Sherman, Rose; Dyess, Susan; Hannah, Ed; Prestia, Angela

    2013-01-01

    A global nursing leadership shortage is projected by the end of this decade. There is an urgent need to begin developing emerging nurse leaders now. This article describes the work of an academic-practice partnership collaborative of nurse leaders. The goal of the partnership is to develop and promote an innovative enhanced nursing administration master's program targeted to young emerging nurse leaders, who have not yet moved into formal leadership roles. An action research design is being used in program development and evaluation. Qualities needed by emerging leaders identified through research included a need to be politically astute, competency with business skills required of nurse leaders today, comfort with ambiguity, use of a caring approach, and leadership from a posture of innovation. The current curriculum was revised to include clinical immersion with a nurse leader from the first semester in the program, a change from all online to online/hybrid courses, innovative assignments, and a strong mentorship component. Eighteen young emerging nurse leaders began the program in January 2012. Early outcomes are positive. The emerging nurse leaders may be uniquely positioned, given the right skills sets, to be nurse leaders in the new age.

  7. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  8. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan

  9. CAREM-25. Project recovery plan of the site at Lima

    International Nuclear Information System (INIS)

    De Arenaza, Ignacio J.

    2009-01-01

    , will be equally reconditioned and reused. The uses that will be given to the currently available buildings are varied, among which it can be highlighted the presence of an important visitor centre, a simulator, a general file (which will keep both the documentation belonging to the CAREM-25 and the one belonging to the ex PEAP) several areas of offices for the site tools store and offices at the stage of construction, a canteen, a recreation centre and workshops, always following a schedule that plans to satisfy the current environmental, well-being and safety at work guidelines. In this report it is expressed that the currently available structures will be maintained, from their external aspect, with a layout and a style similar to the original, in which it will be mentioned and presented the function and use for what it has been built. What has been expressed shows the intention to provide a solution to which it is one of the current greatest problems of the atomic energy, as it is to give a new destiny to a facility that has fallen into disuse. In the same way, it enforces the idea of CAREM as a sustainable and economical Reactor, giving the project a unique character and an additional value. (author)

  10. Hanford Integrated Planning Process: 1993 Hanford Site-specific science and technology plan

    International Nuclear Information System (INIS)

    1993-12-01

    This document is the FY 1993 report on Hanford Site-specific science and technology (S ampersand T) needs for cleanup of the Site as developed via the Hanford Integrated Planning Process (HIPP). It identifies cleanup problems that lack demonstrated technology solutions and technologies that require additional development. Recommendations are provided regarding allocation of funding to address Hanford's highest-priority technology improvement needs, technology development needs, and scientific research needs, all compiled from a Sitewide perspective. In the past, the S ampersand T agenda for Hanford Site cleanup was sometimes driven by scientists and technologists, with minimal input from the ''problem owners'' (i.e., Westinghouse Hanford Company [WHC] staff who are responsible for cleanup activities). At other times, the problem-owners made decisions to proceed with cleanup without adequate scientific and technological inputs. Under both of these scenarios, there was no significant stakeholder involvement in the decision-making process. One of the key objectives of HIPP is to develop an understanding of the integrated S ampersand T requirements to support the cleanup mission, (a) as defined by the needs of the problem owners, the values of the stakeholders, and the technology development expertise that exists at Hanford and elsewhere. This requires a periodic, systematic assessment of these needs and values to appropriately define a comprehensive technology development program and a complementary scientific research program. Basic to our success is a methodology that is defensible from a technical perspective and acceptable to the stakeholders

  11. Site study plan for regional hydrologic sampling and monitoring: Preliminary draft

    International Nuclear Information System (INIS)

    Dutton, A.R.

    1987-01-01

    The purpose of the Regional Hydrologic Studies Plan is to describe those field activities required for completion of the objectives of hydrologic activities. Many of these activities are regional in scope and are designed to provide a framework for understanding the hydrologic setting of the site and the hydrologic processes that influence site characteristics. Site Study Plans (SSPs) define activates at and in the immediate vicinity of the site. The activities specified in the Regional Hydrologic Studies Plan are performed beyond the confines of the site because the hydrologic systems extend beyond the site boundaries, because pertinent data that bear on site suitability are available outside of the site, and because natural analogues exist outside of the site that allow analysis of processes that are expected to operate within the site. 15 refs., 5 figs., 1 tab

  12. Mastering the Maestro: The Effective Maestro Asks Writers, Photographers, and Designers to Trade Places with Readers as They Plan.

    Science.gov (United States)

    Cripe, Dennis

    1998-01-01

    Considers two very different fictional high school newspaper editorships to see how the "maestro" process works. Notes that the process is a management technique similar to brainstorming but in which one person keeps the planning meeting focused. Suggests that the effective maestro asks writers, photographers, and designers to trade places with…

  13. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... to improve the learning environment and quality of life at the POM installation. The Final EIS... are also planned to Leadership in Energy and Environmental Design standards to conserve resources. The... the Chamberlain Library on the OMC. An electronic version of the Final EIS can be viewed or downloaded...

  14. 8051 Master

    International Nuclear Information System (INIS)

    Yoon, Deok Yong

    1981-01-01

    This book tells of system and function of 8051 like what micro controller is, command and addressing mode of 8051, handling of interrupt of 8051, and IO port and timer of 8051, outer interface of 8051 such as semiconductor memory and interface, timer and 82C54 PIT, serial communication and 82C55A PPI, parallel transmission and 82C55A PPI, and AP/D/A converter, tool for software development of 8051, 8051 master kit OK-8051, assembly language programming like instruction manual of OK-8051 kit and addition and subtraction program and C-language programing.

  15. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Science.gov (United States)

    2010-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  16. Brownfields Recommendations for Sustainable Site Design — Green Landscape Plan

    Science.gov (United States)

    The assessment of conditions contained in this report focuses on site-specific environmental and soil conditions that might affect recommendations related to sustainable landscaping and site design, stormwater management, and stormwater reuse.

  17. Confirmation Sampling and Analysis Plan for Spill Site Number 1

    National Research Council Canada - National Science Library

    1998-01-01

    ... No. 1 to document the effectiveness of bioventing for the remediation of petroleum-hydrocarbon-contaminated soils and to provide data for a risk-based assessment of contaminants remaining in site soils and groundwater. Spill Site...

  18. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 7

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Neavada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining hte geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare and environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  19. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 4

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package; and to present the plans for obtaining the geologic information necessary to demonstate the suitability of the site for a repository, to desin the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next; it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  20. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended by the Secretary of Energy and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared by the US Department of Energy (DOE) in accordance with the requirements of the Nulcear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of the site characterization plan are oulined, and compliance with applicable regulations is discussed

  1. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

  2. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Neavada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining hte geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare and environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

  3. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package; and to present the plans for obtaining the geologic information necessary to demonstate the suitability of the site for a repository, to desin the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next; it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

  4. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended by the Secretary of Energy and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared by the US Department of Energy (DOE) in accordance with the requirements of the Nulcear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of the site characterization plan are oulined, and compliance with applicable regulations is discussed.

  5. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

  6. Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

    International Nuclear Information System (INIS)

    Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has

  7. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  8. Management of comments on DOE's Site Characterization Plan (SCP) and integration with the planned geotechnical program

    International Nuclear Information System (INIS)

    Bjerstedt, T.W.; Gil, A.V.; Baird, F.A.

    1991-01-01

    The US DOE has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on both the SCP/Consultation Draft and the statutory SCP. Of these, 2,662 responses have been completed and returned to the originators. Many comments are programmatic in nature and express diverse concerns beyond the scope of the SCP. DOE uses a three-tiered process in responding to comments that integrated technical and management responsibilities. The process defines specific roles in developing, reviewing, and concurring on responses. Commitments or open-items can be generated in DOE responses to comments, which are tracked on a relational database. Major changes reflected in the Secretary of Energy's 1989 reassessment of the high-level waste program were advocated in comments on the SCP. Most DOE commitments, however, deal with consideration of recommendations contained in SCP comments relevant to low-levels of technical planning detail (SCP Study Plans). Commitments are discharged when referred to the appropriate quality-affecting or management process whereupon their merits can be evaluated

  9. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  10. Risky business: Assessing cleanup plans for waste sites

    International Nuclear Information System (INIS)

    Blaylock, B.

    1995-01-01

    ORNL was chosen to perform human health and ecological risk assessments for DOE because of its risk assessment expertise. The U.S. Department of Energy's many production and research sites contain radioactive and hazardous wastes. These waste sites pose potential risks to the health and safety of remediation and waste management workers and the public. The risks, however, vary from site to site. Some sites undoubtedly present larger risks than others and should be cleaned up first. However, before the cleanup begins, DOE is required by law to prepare an environmental impact statement on any actions that may significantly affect the environment-even actions that would clean it up

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  12. Carbon dioxide emissions and the overshoot ratio change resulting from the implementation of 2nd Energy Master Plan in South Korea

    Science.gov (United States)

    Yeo, M. J.; Kim, Y. P.

    2015-12-01

    The direction of the energy policies of the country is important in the projection of environmental impacts of the country. The greenhouse gases (GHGs) emission of the energy sector in South Korea is very huge, about 600 MtCO2e in 2011. Also the carbon footprint due to the energy consumption contributes to the ecological footprint is also large, more than 60%. Based on the official plans (the national greenhouse gases emission reduction target for 2030 (GHG target for 2030) and the 2nd Energy Master Plan (2nd EMP)), several scenarios were proposed and the sensitivity of the GHG emission amount and 'overshoot ratio' which is the ratio of ecological footprint to biocapacity were estimated. It was found that to meet the GHG target for 2030 the ratio of non-emission energy for power generation should be over 71% which would be very difficult. We also found that the overshoot ratio would increase from 5.9 in 2009 to 7.6 in 2035. Thus, additional efforts are required to reduce the environmental burdens in addition to optimize the power mix configuration. One example is the conversion efficiency in power generation. If the conversion efficiency in power generation rises up 50% from the current level, 40%, the energy demand and resultant carbon dioxide emissions would decrease about 10%. Also the influence on the environment through changes in consumption behavior, for example, the diet choice is expected to be meaningful.

  13. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs

  14. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs

  15. Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

  16. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

  17. The Development of an Information System Master Plan for the Pacific Missile Range Facility, Barking Sands, Hawaii

    Science.gov (United States)

    1992-03-01

    sites and support facilities are located on the islands of Niihau and Oahu. Figure 1 depicts the overall layout of PMRF. [Ref. 4: p. 2] In addition...the HIANG facility at Kokee: • a wideband microwave system serving Niihau Island remotely controls operation of the AN/APS-134 surveillance radar, and...provides relay of digitized radar data, control data and voice between the remotely operated, unmanned radar on Niihau Island and Barking Sands

  18. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  19. On-site emergency intervention plan for nuclear accident situation at SCN-Pitesti TRIGA Reactor

    International Nuclear Information System (INIS)

    Margeanu, S.; Oprea, I.

    2008-01-01

    A 14 MW TRIGA research reactor is operated on the Institute for Nuclear Research site. In the event of a nuclear accident or radiological emergency that may affect the public the effectiveness of protective actions depends on the adequacy of intervention plans prepared in advance. Considerable planning is necessary to reduce to manageable levels the types of decisions leading to effective responses to protect the public in such an event. The essential structures of our on-site, off-site and county emergency intervention plan and the correlation between emergency intervention plans are presented. (authors)

  20. Site study plan for intermediate hydrology clusters tests wells Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1988-01-01

    To characterize the geologic, geochemical, and hydrologic characteristics of intermediate-depth formations at the proposed Deaf Smith County, Texas, repository site, wells called Intermediate Hydrology clusters will test the Dewey Lake, Alibates, Salado, Yates, Upper and Lower Seven Rivers, and Queen Grayburg Formations. Sixteen wells will be installed at six locations. One location will have four wills, two locations will have three wells, and three locations will have two wells for a total of 16 wells. Testing of the formations is to proceed from the bottom up, with 2-day pumping tests at the less permeable formations. Tracer tests and tests for verticall hydraulic properties will be designed and performed after other hydrologic tests are completed. After testing, selected wells are to be completed as single or possibly dual monitoring wells to observe water-level trends. To develop a hydrogeologic testing plan, the response of each formation to potential testing procedures was evaluated using design values and an assumend range for hydraulic parameters. These evaluations indicate that hydraulic properties of a sandy zone of the Dockum, the lower Sever Rivers, and possibly the Alibates and Queen/Grayburg can be determined by pumping tests. Standard of shut-in slug tests must be conducted in the remaining formations. Tests of very long duration would be required to determine the verticla properties of less permeable formations. Tracer tests would also require weeks or months. 61 figs., 34 refs., 4 tabs

  1. Defense Infrastructure: Opportunity to Improve the Timeliness of Future Overseas Planning Reports and Factors Affecting the Master Planning Effort for the Military Buildup on Guam

    National Research Council Canada - National Science Library

    Lepore, Brian J; Little, Mark; Alcoser, Nelsie; Jones, Mae; Lenane, Kate; Matta, Julia; Moon, Jamilah

    2008-01-01

    ... after the February 2008 budget submission, even though both the Senate and conference reports accompanying the fiscal year 2004 military construction bill require DOD to issue the plans with the military construction budget submission...

  2. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  3. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  4. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  5. 38 CFR 39.20 - Site planning standards.

    Science.gov (United States)

    2010-07-01

    ... depending on the State veteran population and national cemetery availability. (3) Accessibility. The site.... The curbs shall not be less than 4 inches high and 4 inches wide. A level platform in a ramp shall not.... Site furnishings include signage, trash receptacles, benches, and flower containers. These items should...

  6. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan

  7. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    International Nuclear Information System (INIS)

    1985-01-01

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure

  8. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  9. Screening criteria for siting waste management facilities: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    The Midwest Interstate Low-Level Radioactive Waste Commission (Midwest Compact) seeks to define and place into operation a system for low-level waste management that will protect the public health and safety and the environment from the time the waste leaves its point of origin. Once the system is defined it will be necessary to find suitable sites for the components of that waste management system. The procedure for siting waste management facilities that have been chosen by the compact is one in which a host state is chosen for each facility. The host state is then given the freedom to select the site. Sites will be needed of low-level waste disposal facilities. Depending on the nature of the waste management system chosen by the host state, sites may also be needed for regional waste treatment facilities, such as compactors or incinerators. This report provides example criteria for use in selecting sites for low-level radioactive waste treatment and disposal facilities. 14 refs

  10. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  11. Sites Requiring Facility Response Plans, Geographic NAD83, EPA (2006) [facility_response_plan_sites_la_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Locations of facilities in Louisiana requiring Oil Pollution Act (OPA) Facility Response Plans (FRP). The dataset was provided by the Region 6 OSCARS program....

  12. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    International Nuclear Information System (INIS)

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document

  13. Land Use and Land Cover (LULC) Change Detection in Islamabad and its Comparison with Capital Development Authority (CDA) 2006 Master Plan

    Science.gov (United States)

    Hasaan, Zahra

    2016-07-01

    Remote sensing is very useful for the production of land use and land cover statistics which can be beneficial to determine the distribution of land uses. Using remote sensing techniques to develop land use classification mapping is a convenient and detailed way to improve the selection of areas designed to agricultural, urban and/or industrial areas of a region. In Islamabad city and surrounding the land use has been changing, every day new developments (urban, industrial, commercial and agricultural) are emerging leading to decrease in vegetation cover. The purpose of this work was to develop the land use of Islamabad and its surrounding area that is an important natural resource. For this work the eCognition Developer 64 computer software was used to develop a land use classification using SPOT 5 image of year 2012. For image processing object-based classification technique was used and important land use features i.e. Vegetation cover, barren land, impervious surface, built up area and water bodies were extracted on the basis of object variation and compared the results with the CDA Master Plan. The great increase was found in built-up area and impervious surface area. On the other hand vegetation cover and barren area followed a declining trend. Accuracy assessment of classification yielded 92% accuracies of the final land cover land use maps. In addition these improved land cover/land use maps which are produced by remote sensing technique of class definition, meet the growing need of legend standardization.

  14. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  15. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  16. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  17. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project

  19. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    International Nuclear Information System (INIS)

    1995-01-01

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals

  20. La "capacidad vial" del plan regulador chileno, ¿es lo suficientemente buena para dar forma a un entorno edificado sostenible?/ The "road capacity" of the chilean master plan is it good enough for shaping a sustainable built environment?

    Directory of Open Access Journals (Sweden)

    Cárdenas Jirón, Luz Alicia

    2000-03-01

    Full Text Available The "road capacity" of the Chilean Master Plan is a tool developed to measure the capacity of streets in terms of supporting the size of vehicle flow. This tool considers topics such as land use, population density and street width. The purpose of this technique is to incorporate it to the Master Plan, as a town planning instrument, so as to cope with traffic forecasting and congestion. However, the technique does not embrace any sustainability concept, this is due to a disregard of any district ´s social or environmental needs. Therefore a sustainable urban development would doubtfully be reached. It is argued that some other approaches are required for shaping a sustainable built environment in which it is understood that the streets are a public space for people rather than a platform for moving vehicles only. This means, to promote accessibility as well as mobility. In this paper the author reviews borrowed concepts such as "carrying capacity" and "environmental capacity" from bioregionalist and ecological disciplines using a case study in outskirts of Santiago´s metro area./La "capacidad vial" del Plan Regulador chileno es una herramienta desarrollada para medir la capacidad de las calles en términos de apoyar el tamaño del flujo de vehículos. Esta herramienta considera temas como el uso de la tierra, la densidad de población y ancho de la calle. El propósito de esta técnica es su incorporación al Plan Maestro, como un instrumento de planificación de la ciudad, con el fin de hacer frente a la previsión del tráfico y la congestión. Sin embargo, la técnica no incluye ningún concepto de sostenibilidad. Por lo tanto un desarrollo urbano sostenible dudosamente sería alcanzado. Se argumenta que algunos otros enfoques son necesarios para dar forma a un medio ambiente sostenible integrado, en el que se entiende que las calles son un espacio público para las personas en lugar de una plataforma para mover los vehículos solamente

  1. High-level radioactive waste repositories site selection plan

    International Nuclear Information System (INIS)

    Castanon, A.; Recreo, F.

    1985-01-01

    A general vision of the high level nuclear waste (HLNW) and/or nuclear spent fuel facilities site selection processes is given, according to the main international nuclear safety regulatory organisms quidelines and the experience from those countries which have reached a larger development of their national nuclear programs. (author)

  2. Site qualification plan for the Subseabed Disposal Program

    International Nuclear Information System (INIS)

    Laine, E.P.; Anderson, D.R.; Hollister, C.D.

    1983-01-01

    In our evolving study to identify and examine sites in subseabed geological formations for use as repositories for high-level nuclear wastes, two primary criteria guide all phases of this work: the stability and barrier criteria of the site. The stability criterion defines areas of the seabed not likely to be disturbed by tectonic forces and oceanographic changes during the lifetime of a waste repository. The barrier criterion defines those subseabed geological formations most likely to form an effective barrier to the release of radionuclides. Because of the large area of the oceans, a phased approach has been adopted so that successively smaller areas of the seafloor can be studied in ever greater detail. The first phase, which is complete, has identified the abyssal clay deposits that are remote from tectonic boundaries and continental margins as being the regions (<10/sup 6/ km/sup 2/) on the seafloor within which acceptable sites might be most readily identified. The second phase involves downgrading less desirable areas within these regions using archived seismic reflection profiling, sediment cores, and oceanographic data. This winnowing process identifies locations about one degree square (≤10/sup 4/ km/sup 2/) for more detailed field studies during the first part of the third phase. From these locations candidate sites will be chosen, based on detailed geological and geophysical surveying. The second part of the third phase will involve detailed monitoring of the candidate sites to determine long-term baseline conditions. After monitoring is underway, a pilot repository will be established, using waste canisters

  3. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  4. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations

  5. Unmanned Aerial Vehicles Master Plan, 1994. Master Plan.

    Science.gov (United States)

    1994-05-31

    Terminal SINCGARS = Single-Channel Ground and Airborne Radio System Figure 3-5 Maneuver Variant CONOPS I Psychological operations. deployment with early...650 KM DAT M 3 K (300 DESIRED) BEYOND FORWARD LINE OF OWN TROOPS (FLOT) APPROXIMATE RADIUS OF ACTION LEGEND ATARS = Advanced Tactical Air

  6. Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    Carr, Adrianne E. [Argonne National Lab. (ANL), Argonne, IL (United States); Wuthrich, Kelsey K. [Argonne National Lab. (ANL), Argonne, IL (United States); Ziech, Angela M. [Argonne National Lab. (ANL), Argonne, IL (United States); Bowen, Esther E. [Argonne National Lab. (ANL), Argonne, IL (United States); Quinn, John [Argonne National Lab. (ANL), Argonne, IL (United States)

    2013-03-01

    This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use or with monitoring data.

  7. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  8. Geological-Hydrological Site Evaluation for NPP Planning

    Energy Technology Data Exchange (ETDEWEB)

    Faust, Brigitte; Mini, Paolo [Nordostsschweizerische Kraftwerke AG NOK, Parkstrasse 23, 5401 Baden (Switzerland)

    2008-07-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  9. Geological-Hydrological Site Evaluation for NPP Planning

    International Nuclear Information System (INIS)

    Faust, Brigitte; Mini, Paolo

    2008-01-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  10. UMTRA Project Site Observational Work Plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1994-09-01

    Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone

  11. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  12. Nuclear criticality project plan for the Hanford Site tank farms

    Energy Technology Data Exchange (ETDEWEB)

    Bratzel, D.R., Westinghouse Hanford

    1996-08-06

    The mission of this project is to provide a defensible technical basis report in support of the Final Safety Analysis Report (FSAR). This technical basis report will also be used to resolve technical issues associated with the nuclear criticality safety issue. The strategy presented in this project plan includes an integrated programmatic and organizational approach. The scope of this project plan includes the provision of a criticality technical basis supporting document (CTBSD) to support the FSAR as well as for resolution of the nuclear criticality safety issue. Specifically, the CTBSD provides the requisite technical analysis to support the FSAR hazard and accident analysis as well as for the determination of the required FSAR limits and controls. The scope of The CTBSD will provide a baseline for understanding waste partitioning and distribution phenomena and mechanistics for current operational activities inclusive of single-shell tanks, double-shell tanks, double-contained receiver tanks, and miscellaneous underground storage tanks.. Although the FSAR does not include future operational activities, the waste partitioning and distribution phenomena and mechanistics work scope identified in this project plan provide a sound technical basis as a point of departure to support independent safety analyses for future activities. The CTBSD also provides the technical basis for resolution of the technical issues associated with the nuclear criticality safety issue. In addition to the CTBSD, additional documentation will be required to fully resolve U.S. Department of Energy-Headquarters administrative and programmatic issues. The strategy and activities defined in this project plan provide a CTBSD for the FSAR and for accelerated resolution of the safety issue in FY 1996. On April 30, 1992, a plant review committee reviewed the Final Safety Analysis Reports for the single-shell, double-shell, and aging waste tanks in light of the conclusions of the inadequate waste

  13. Life Cycle Project Plan Outline: Web Sites and Web-based Applications

    Science.gov (United States)

    This tool is a guideline for planning and checking for 508 compliance on web sites and web based applications. Determine which EIT components are covered or excepted, which 508 standards and requirements apply, and how to implement them.

  14. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Decontamination Pond Facility. Revision 1

    International Nuclear Information System (INIS)

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes

  15. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting

  16. On the question of a site plan approval procedure for large-scale power stations

    International Nuclear Information System (INIS)

    Roemermann, K.

    1982-01-01

    The author discusses the question whether a plan approval procedure for large-sclae power plants might contribute to shortening the period of time currently used for the licensing of such plants. On the basis of current practice which includes a planning and building permission by virtue of section 35 of the building law (BBauG) together with an approval of plans within the framework of regional planning, the author explains and discusses various models of site plan approval procedures, (a.o. section 38 of the Federal building law). (HP) [de

  17. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  18. Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1992-07-01

    The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report

  19. Proposed site treatment plan (PSTP) Volumes I ampersand II ampersand reference document, Revision 3

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.

    1995-01-01

    The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste

  20. Interfaces entre a política habitacional e o Plano Diretor Participativo na metrópole Fortaleza-CE / Relations between the housing policy and participatory master plan in metropolis Fortaleza, Ceará, Brazil

    Directory of Open Access Journals (Sweden)

    Elizete de Oliveira Santos

    2013-12-01

    Full Text Available The housing question appears as essential element to understanding the production, consumption and appropriation processes of urban space, illuminating the relationship between sociospatial segregation and real state speculation that govern the brazilians' cities structuring. This paper proposes to discuss the relations between the Participatory Master Plan of Fortaleza (PDPFor and the Municipal Housing Policy (PHIS, aiming to contribute to the reflection of the importance of the urban and housing policies integration. The text is divided into three parts: the first discusses the context of the emergence of the master plans "new generation" in Brazil; the second reconstructs the preparation process of the PDPFor and PHIS; and the third proposes a questioning about the dialogue between the urban and housing political, based on the analysis of the content of PHIS and housing policy chapter in PDPFor.

  1. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  2. 218-E-8 Borrow Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The 218-E-8 Demolition Site was the site of a single demolition event in November of 1984. This demolition event was a form of thermal treatment for discarded explosive chemical products. Because the 218-E-8 Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations,'' Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 218-E-8 Borrow Pit Demolition Site Closure Plan consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3, Revision 4, and a closure plan. An explanation of the Part A Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the 218-E-8 Demolition Site, the history of the waste treated, and the approach that will be followed to close the 218-E-8 Demolition Site. Because there were no radioactively contaminated chemicals involved in t he demolitions at the 218-E-8 Borrow Pit site, the information on radionuclides is provided for ''information only.'' Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from 218-E-8 Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  3. Perry Nuclear Plant's Plans for on-site storage

    International Nuclear Information System (INIS)

    Ratchen, J.T.

    1993-01-01

    Because of current radwaste disposal legislation and the eventual denial of access to the Barnwell, Richland, and Beatty burial sites, it was imperative for the Perry nuclear power plant to develop alternative means for handling its generated radioactive waste. The previous radwaste facilities at Perry were developed for processing, packaging, short-term storage, and shipment for burial. In order to meet the changing needs, new facilities have been constructed to handle the processing, packaging, and 5-yr interim storage of both dry active waste (DAW) and dewatered or solidified resin, filter media, etc

  4. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Site Assessment Plan (SAP)? 285.605... Assessment Plan (SAP)? (a) A SAP describes the activities (e.g., installation of meteorological towers... project easement, or to test technology devices. (1) Your SAP must describe how you will conduct your...

  5. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  6. Changes of the carbon dioxide emissions and the overshoot ratio resulting from the implementation of the 2nd Energy Master Plan in the Republic of Korea

    International Nuclear Information System (INIS)

    Yeo, M.J.; Kim, Y.P.

    2016-01-01

    Based on the national greenhouse gas emission reduction target for 2030 (“GHG target for 2030″) and the 2nd Energy Master Plan (“2nd EMP”), several power mix configuration scenarios were tested to estimate the sensitivity of the carbon dioxide emissions and the ‘overshoot ratio’, which is the ratio of ecological footprint to biocapacity. It would be only possible to achieve the GHG target for 2030 if the fraction of non-emission energy be more than 70% of the total input primary energy for power generation with the current conversion efficiency (40%). Even the conversion efficiency is changed to 50%, still the carbon dioxide emissions are larger than the targeted carbon dioxide emissions from the energy sector. The overshoot ratio would still increase from 5.9 in 2009 to 7.6 in 2035 even with the successful implementation of the 2nd EMP. Thus, additional efforts to reduce the carbon dioxide emissions and the overshoot ratio from the energy sector are required beyond adjusting the supply mix configuration for power generation and the conversion efficiency. Policies and programs encouraging the changes in consumer behavior toward reduction of goods consumption and energy savings are expected to impact on reducing the carbon dioxide emissions and the overshoot ratio. - Highlights: •The overshoot ratio will increase in 2035 even if the 2nd EMP is fully implemented. •Power mix configuration changes would not be enough to achieve the GHG target. •Increasing the conversion efficiency is good in long-term to achieve the GHG target.

  7. Savannah River Site integrated stabilization management plan. Revision 3

    International Nuclear Information System (INIS)

    Geddes, R.L.; Barone, A.; Shook, H.E.; Varner, C.E.; Rollins, R.

    1996-01-01

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1. The concern is that the halt in production of materials to be used in nuclear weapons froze the manufacturing pipeline in a state that, for safety reasons, should not be allowed to persist unremediated. This recommendation had eight specific sub-recommendations that dealt with the potential problems. Specifically, the Board expressed concern about certain liquids and solids containing fissile materials and other radioactive substances located in spent fuel storage pools, reactor basins, reprocessing canyons; and various other facilities once used for processing and weapons manufacture. The WSRC and DOE-SR acknowledges and shares the Board's concerns and has developed this Integrated Stabilization Management Plan (ISMP) to aggressively address these urgent problems in a systems engineering approach

  8. Vulnerability Assessments and Resilience Planning at Federal Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moss, Richard H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Blohm, Andrew [Univ. of Maryland, College Park, MD (United States); Delgado, Alison [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henriques, Justin J. [James Madison Univ., Harrisonburg, VA (United States); Malone, Elizabeth L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-01

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Departments of Energy and Defense. The paper provides a framework of steps for climate vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change.

  9. Medical Technology Base Master Plan

    Science.gov (United States)

    1990-03-01

    trflpical areas relatcd Equin Encephalitis (’(FE) was developed, to 70 plague epidemics to weatlier as a functmo of flea physi. A malarnma...havo increased the likelihood of bum injuries. Bum treatment requires 8 huge investment of professional resources In terms of physicians, nurses , and...Support ai General Hospitais and Convalescent Centers 46 Inadequate Veterinary Support of Military Worlking Dogs ,MWD) Figurti VI-2. AMEOID Capab~ility

  10. Total Quality Management Master Plan

    Science.gov (United States)

    1989-01-01

    Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals

  11. The master plan of Cartagena

    International Nuclear Information System (INIS)

    Cardenas, Diego Hernan

    2004-01-01

    The paper refers to the activities to execute for ECOPETROL in the refinery of Cartagena, like they are the increment in the production of gasoline, new units of sulfur, optimization of the refinery including the construction of a new unit of raw

  12. Dayton Greenway Conceptual Master Plan

    OpenAIRE

    Gilboy, Elizabeth Truex; Philen, Melissa; Stroud, Patricia; Thomas, Andrea; Williams, Daphne; Alves, Elena; Zhong, Cen

    2016-01-01

    The Town of Dayton, with a population of just over 1,500 in 2013, is one of the oldest settled communities in Rockingham County and the county's second oldest incorporated town. Formed in 1778 from Augusta County, Rockingham County is bounded on the west by the Allegheny Mountains and on the east by the crest of the Blue Ridge Mountains. Between the natural boundaries, approximately a third of Rockingham County is protected by the Federal Government as National Forest and National Park land. ...

  13. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  14. Engineering, Analysis and Technology FY 1995 Site Support Program Plan

    International Nuclear Information System (INIS)

    Suyama, R.M.

    1994-09-01

    The vision of the Engineering, Analysis and Technology organization is to be recognized as the cost-effective supplier of specialized, integrated, multi-disciplined engineering teams to support Hanford missions. The mission of the Engineering, Analysis and Technology organization is to provide centralized engineering services. These services are focused on supplying technical design, analytical engineering and related support services that support Hanford's environmental restoration mission. These services include engineering analysis, design and development of systems and engineered equipment, supplying multi-disciplined engineering teams to all Hanford programs and project organizations, engineering document release, and site-wide leadership in the development and implementation of engineering standards, engineering practices, and configuration management processes

  15. Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ''limited use.''

  16. 6 CFR 27.245 - Review and approval of site security plans.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  17. Site observational work plan for the UMTRA Project Site at Riverton, Wyoming. Revision 3/95

    International Nuclear Information System (INIS)

    1995-03-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Riverton, Wyoming, site, is governed by the Uranium Mill Tailings Radiation Control Act and the US Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. The compliance strategy proposed for this site is natural flushing in conjunction with institutional controls. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels or alternate concentration limits that do not pose a risk to human health or the environment within 100 years. This document contains the following sections. Section 2.0 of this SOWP describes the requirements for meeting standards at UMTRA Project sites. Section 3.0 provides site-specific data and the related conceptual model. Section 4.0 provides the justification for the recommended ground water compliance strategy for the Riverton site. Section 5.0 provides the justification and process for collection and assessment of additional required data. Section 6.0 provides a list of the references cited. The appendixes include data on monitor wells and lithography, ground water, surface water, and sediment quality

  18. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  19. Y-12 Site environmental protection program implementation plan (EPPIP)

    International Nuclear Information System (INIS)

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually

  20. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  1. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  2. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  3. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs

  4. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, S.R.

    1994-09-01

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  5. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  6. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Grant Evenson

    2006-01-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139

  7. Long-term surveillance plan for the Mexican Hat disposal site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This plan describes the long-term surveillance activities for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Mexican Hat, Utah. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This long-term surveillance plan (LTSP) was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive material (RRM). This LTSPC documents the land ownership interests and details how the long-term care of the disposal site will be accomplished

  8. Site Sustainability Plan with FY2015 Performance Data

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Teresa A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hudey, Bryce D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-12-01

    Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory in the US Department of Energy (DOE) complex and one of the oldest national laboratories still operating at its original site. ORNL implemented an aggressive modernization program in 2000, providing modern, energy-efficient facilities that help to support the growth of important national scientific missions while faced with the unique and challenging opportunity to integrate sustainability into legacy assets. ORNL is committed to leveraging the outcomes of DOE-sponsored research programs to maximize the efficient use of energy and natural resources across a diverse campus. ORNL leadership in conjunction with the Sustainable Campus Initiative (SCI) maintains a commitment to the integration of technical innovations into new and existing facilities, systems, and processes with a comprehensive approach to achieving DOE directives and the new Executive Order 13693. Energy efficiency, greenhouse gas reductions, climate change resiliency, and other pursuits toward integrated sustainability factor in all we do. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community.

  9. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  10. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    Ground water in the uppermost aquifer beneath and downgradient from the Spook site was contaminated by uranium-processing activities that occurred from 1962 until 1966. Contamination from the tailings pile and the acid pond (including uranium, selenium, nitrate, and radium-226 and -228) leached into the subsurface by infiltration and migrated into ground water, forming a plume extending approximately 2,500 feet (ft) (760 meters [m]) downgradient from the site. The surface remedial action at the Spook site under Subpart A of 40 CFR Part 192 consisted of stabilizing the uranium mill tailings and other residual radioactive materials in a disposal cell in the bottom of the Spook open-pit mine and covering the cell with overburden material. The ground water protection strategy was supplemental standards based on Class 3 ground water in the uppermost aquifer because of widespread ambient contamination. The proposed ground water protection strategy to comply with Subpart B of 40 CFR Part 192 at the Spook site is to perform no remediation. This strategy is based on ground water in the uppermost aquifer (also the zone of contamination) being classified as Class 3, which allows the application of supplemental standards. Class 3 ground water beneath the Spook site is neither a current nor a potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed in public water supply systems

  11. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  12. A method for site-dependent planning and its application to the preselection of sites for thermal power plants

    International Nuclear Information System (INIS)

    Friedrich, R.

    1979-01-01

    In the first part of the paper a computer-aided method for dealing with the problems of site-dependent planning is described. By means of the modular program system COPLAN complex conjunction between locally varying data can be performed rapidly and accurately with respect to spatial orientation. The system consists of data input, numerous ways of processing, and graphical representation of the results. The second part shows the application of the system to preselection of sites for thermal power plants. By means of a method analyzing its usefulness, the suitability of each point in (the German Federal State of) Baden-Wuerttemberg as a power plant site is determined. Compared with the currently used methods of preliminary site selection the present method is distinguished by area-covering calculation, the possibility of balancing up advantages and disadvantages, as well as transparency and suitability for being checked up. The paper establishes and considers criteria from the fields of operational economy, safety, ecology, and district planning. The computations are performed for different orders of preference. It is shown that there are regions of sites which are acceptable with respect to a large spectrum of object systems. (orig.) [de

  13. Site study plan for EDBH [Engineering Design Boreholes] seismic surveys, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    Hume, H.

    1987-12-01

    This site study plan describes seismic reflection surveys to run north-south and east-west across the Deaf Smith County site, and intersecting near the Engineering Design Boreholes (EDBH). Both conventional and shallow high-resolution surveys will be run. The field program has been designed to acquire subsurface geologic and stratigraphic data to address information/data needs resulting from Federal and State regulations and Repository program requirements. The data acquired by the conventional surveys will be common-depth- point, seismic reflection data optimized for reflection events that indicate geologic structure near the repository horizon. The data will also resolve the basement structure and shallow reflection events up to about the top of the evaporite sequence. Field acquisition includes a testing phase to check/select parameters and a production phase. The field data will be subjected immediately to conventional data processing and interpretation to determine if there are any anamolous structural for stratigraphic conditions that could affect the choice of the EDBH sites. After the EDBH's have been drilled and logged, including vertical seismic profiling, the data will be reprocessed and reinterpreted for detailed structural and stratigraphic information to guide shaft development. The shallow high-resulition seismic reflection lines will be run along the same alignments, but the lines will be shorter and limited to immediate vicinity of the EDBH sites. These lines are planned to detect faults or thick channel sands that may be present at the EDBH sites. 23 refs. , 7 figs., 5 tabs

  14. Environmental planning and the siting of nuclear facilities: the integration of water, air, coastal, and comprehensive planning into the nuclear siting process. Improving regulatory effectiveness in federal/state siting actions

    International Nuclear Information System (INIS)

    Noble, J.B.; Epting, J.T.; Blumm, M.C.; Ackerman, S.; Laist, D.W.

    1977-02-01

    The National Environmental Policy Act, the Coastal Zone Management Act, the Federal Water Pollution Control Act, the Clean Air Act Amendments, and the Housing and Urban 701 Comprehensive Planning Assistance Program are discussed in relation to the planning and siting of nuclear facilities

  15. Soil class around me Serpong experimental power reactor (EPR) site plan base on micro tremor data

    International Nuclear Information System (INIS)

    Marjiyono; Soehaimi A; Hadi Suntoko; Yuliastuti; Syaeful H

    2015-01-01

    Surface geological characteristics has an important role on site response analysis in a region. In regard with experimental power reactor (EPR) construction plan in Serpong, the subsurface modeling from combination array and single station micro tremor data was done. The array and single station micro tremor measurement were performed in 9 and 90 sites, respectively, at ± 1 km radius around the EPR site plan. The Vs30 value was calculated from shear wave velocity structure around the investigated area. The soil classification based on Vs30 in the investigated area generally consists of SD (medium soil) and SC (soft rock) class. The EPR site plan its self in the SD class region. (author)

  16. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    International Nuclear Information System (INIS)

    2012-01-01

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  17. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  18. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  19. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Steam Cleaning Effluent Ponds

    International Nuclear Information System (INIS)

    1996-02-01

    This plan presents the strategy for the characterization of the Area 6 South and North Steam Cleaning Effluent Ponds (SCEPs) at the Nevada Test Site (NTS) to be conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration Division (ERD). The purposes of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste (IDW). The scope of the characterization may include excavation, drilling, and sampling of soil in and around both ponds; sampling of the excavated material; in situ sampling of the soil at the bottom and on the sides of the excavations as well as within subsurface borings; and conducting sample analysis for both characterization and waste management purposes. Contaminants of concern include RCRA-regulated VOCs and metals

  20. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose