WorldWideScience

Sample records for management units construction

  1. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  2. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  3. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  4. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  5. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  6. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  7. Industrial safety management with emphasis on construction safety

    International Nuclear Information System (INIS)

    Bhattacharya, R.

    2016-01-01

    Safety professionals, line managers, team leaders and concerned workers today eagerly discuss to find out the best safety approach for their workplace. Some research suggested that behaviour based and comprehensive ergonomics approaches lead in average reduction of injuries. This article discusses 'the science and engineering' behind improvement in industrial safety aspects particularly at construction sites through various safety approaches. A high degree of commitment to safety by the project management and rigorous and proactive measures are essential to prevent accidents at construction sites particularly in DAE units because of its sensitivity. Persistent efforts by the project management are needed for sustainable and committed safety at work place. The number of fatalities occurring from construction work in DAE units is sometimes disturbing and fall of person from height and through openings are the major causes for serious accidents

  8. A regulatory perspective of the role of construction in revitalizing the United States nuclear industry

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1983-01-01

    Technical and managerial experience in nuclear power plant construction is presented from the perspective of the United States Nuclear Regulatory Commission (NRC). In the context of actions that would contribute to revitalizing the nuclear industry in the United States of America, greater effectiveness of utility management during construction is proposed. The reasons why management effectiveness is so important are developed beginning with summaries of defects that were built into several US plants under construction. The root causes of these significant defects were management failures. In terms of benefits, effective management is important because of its effects on nuclear safety, project construction costs, and future reliability of the plant after commissioning. Actions that would enhance good management include emphasizing the inseparable nature of production and quality, that quality cannot be inspected into a plant, and that a strong construction management staff and exchanges of experience and information are essential. Techniques that have been used successfully in construction management are discussed. NRC and industry initiatives are in progress to improve management responsibility and learning from experience. Projects include Owner's Certification, assessments of licensee performance, fostering good practices across the industry, and improving the NRC inspection programme. Revitalization will not be easy, but it is achievable. (author)

  9. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  10. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  11. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  12. Management as a Symbolizing Construction? Re-Arranging the Understanding of Management

    Directory of Open Access Journals (Sweden)

    Katharina Mayr

    2010-09-01

    Full Text Available In this article, we outline the concept of management as a symbolizing construction. According to Niklas LUHMANN, organizations process by referring to decisions. But decisions are not simply "given" and in principle invisible. This is the reason why organizations institute formalities like protocols, signatures or other insignia of the official that symbolize the decision—without actually being a decision. These symbols allow for making decisions "process-able." And just like a protocol or a signature, management symbolizes decisions as well. Management provides an organizational practice with symbols of decision making without being the "unity" of the decisions, as decisions perpetually have to be reconstructed, redefined and rearranged in the communication of all organizational units. Therefore management symbolizes on the one hand more than it can achieve. On the other hand the importance of management as a symbolizing construction lies in allowing the reconstruction, redefining and rearrangement of decisions by making them visible and recognizable. Heroic managers, meetings, management tools and procedures are solutions to the paradox of decision making. By symbolizing decidedness they create credibilities that conceal the self-referential construction of organizational communication and the paradox of its decision praxis. URN: urn:nbn:de:0114-fqs1003218

  13. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  14. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  15. Document management in engineering construction

    International Nuclear Information System (INIS)

    Liao Bing

    2008-01-01

    Document management is one important part of systematic quality management, which is one of the key factors to ensure the construction quality. In the engineering construction, quality management and document management shall interwork all the time, to ensure the construction quality. Quality management ensures that the document is correctly generated and adopted, and thus the completeness, accuracy and systematicness of the document satisfy the filing requirements. Document management ensures that the document is correctly transferred during the construction, and various testimonies such as files and records are kept for the engineering construction and its quality management. This paper addresses the document management in the engineering construction based on the interwork of the quality management and document management. (author)

  16. Peer Assessment for Construction Management and Quantity Surveying Students

    Directory of Open Access Journals (Sweden)

    Patricia McLaughlin

    2012-11-01

    Full Text Available Students undertaking the Bachelor of ConstructionManagement degree course at RMIT University, Melbourne,qualify for registration with the Australian Institute ofQuantity Surveyors (AIQS and the Australian Institute ofBuilding (AIB upon graduation. Over the past decade thedegree course has been constantly upgraded and altered inline with recommendations from professional bodies such asthese and other industry partners. In 1994 the Departmentof Building and Construction Economics re-assesseda range of subjects including the first year technologysubjects. Out of the review a problem-based integratedlearning unit was developed and tested. This unit has nowbeen in place for ten years.Quantity surveying and construction management likemost other professions in the construction industryrequire teamwork and advanced consultation skills. Theseskills may be learnt through experience but there isconsiderable evidence that these skills can be taught in theundergraduate years. Therefore in line with team-basedapproaches used in industry and professional constructionsettings, this year a new assessment model - peerassessment - will be applied to the problem-based learningunit. This paper describes the procedures and processesused to introduce the change and examines the theoreticalbase upon which the model was developed.

  17. Life cycle assessment of construction and demolition waste management

    DEFF Research Database (Denmark)

    Butera, Stefania; Christensen, Thomas Højlund; Astrup, Thomas Fruergaard

    2015-01-01

    Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed...... of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most...... of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing...

  18. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  19. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  20. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  1. Waste management regroups units into Rust International

    International Nuclear Information System (INIS)

    Kirschner, E.

    1992-01-01

    Three Waste Management (Oak Brook, IL) subsidiaries have proposed merging units from Chemical Waste Management (CWM) and Wheelabrator Technologies with the Brand Companies (Park Ridge, IL). Waste Management says the new company, to be called Rust International, will become one of the US's largest environmental consulting and infrastructure organizations and will include design and construction services. Waste Management expects the merged company's 1993 revenues to reach $1.8 billion. It will be based in Birmingham, AL and have 12,000 employees

  2. Simulation-based modeling of building complexes construction management

    Science.gov (United States)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  3. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  4. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  5. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  6. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  7. 7 CFR 1755.510 - Construction and assembly unit drawings.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction and assembly unit drawings. 1755.510..., AND STANDARD CONTRACT FORMS § 1755.510 Construction and assembly unit drawings. (a) The construction and assembly unit drawings in this section shall be used by borrowers to assist the installer in...

  8. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  9. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  10. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  11. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  12. Construction Management--Exploding Some Myths.

    Science.gov (United States)

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  13. Workshop presentation: research guidelines for Construction Management

    OpenAIRE

    Marco Alvise Bragadin

    2013-01-01

    Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...

  14. A theory of construction management?

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-09-01

    Full Text Available The links between theory and construction management (CM, and for that matter construction economics (CE, are not strong (see de Valence 2011. This may be one of the reasons why they have not gained complete acceptance as academic disciplines and are not seen as distinct branches of economics and management respectively. Another reason may be that products and production (the focus of management and economic theories respectively are not the same as projects and project management in general, and construction projects and CM in particular.

  15. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  16. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  17. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  18. Human Factors Simulation in Construction Management Education

    Science.gov (United States)

    Jaeger, M.; Adair, D.

    2010-01-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…

  19. Conceptual Model for Systematic Construction Waste Management

    OpenAIRE

    Abd Rahim Mohd Hilmi Izwan; Kasim Narimah

    2017-01-01

    Development of the construction industry generated construction waste which can contribute towards environmental issues. Weaknesses of compliance in construction waste management especially in construction site have also contributed to the big issues of waste generated in landfills and illegal dumping area. This gives sign that construction projects are needed a systematic construction waste management. To date, a comprehensive criteria of construction waste management, particularly for const...

  20. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  1. Strategies for healthcare facilities, construction, and real estate management.

    Science.gov (United States)

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  2. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  3. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  4. Control system design specification of advanced spent fuel management process units

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, S. H.; Kim, S. H.; Yoon, J. S

    2003-06-01

    In this study, the design specifications of instrumentation and control system for advanced spent fuel management process units are presented. The advanced spent fuel management process consists of several process units such as slitting device, dry pulverizing/mixing device, metallizer, etc. In this study, the control and operation characteristics of the advanced spent fuel management mockup process devices and the process devices developed in 2001 and 2002 are analysed. Also, a integral processing system of the unit process control signals is proposed, which the operation efficiency is improved. And a redundant PLC control system is constructed which the reliability is improved. A control scheme is proposed for the time delayed systems compensating the control performance degradation caused by time delay. The control system design specification is presented for the advanced spent fuel management process units. This design specifications can be effectively used for the detail design of the advanced spent fuel management process.

  5. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  6. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  7. Financial management of the construction company

    Directory of Open Access Journals (Sweden)

    Antosova, Karolina

    2016-12-01

    Full Text Available This paper informs about the financial management in the construction company. The work describes problems of the management, its tasks, goals, dependencies on the size of the construction company and progress in the construction production and also introduce topic of the risks in the construction business. Also controlling and reporting in the construction company together with basic tools are described in example of Metrostav a.s. in this work.

  8. Construction and management of ARDS/sepsis registry with REDCap.

    Science.gov (United States)

    Pang, Xiaoqing; Kozlowski, Natascha; Wu, Sulong; Jiang, Mei; Huang, Yongbo; Mao, Pu; Liu, Xiaoqing; He, Weiqun; Huang, Chaoyi; Li, Yimin; Zhang, Haibo

    2014-09-01

    The study aimed to construct and manage an acute respiratory distress syndrome (ARDS)/sepsis registry that can be used for data warehousing and clinical research. The workflow methodology and software solution of research electronic data capture (REDCap) was used to construct the ARDS/sepsis registry. Clinical data from ARDS and sepsis patients registered to the intensive care unit (ICU) of our hospital formed the registry. These data were converted to the electronic case report form (eCRF) format used in REDCap by trained medical staff. Data validation, quality control, and database management were conducted to ensure data integrity. The clinical data of 67 patients registered to the ICU between June 2013 and December 2013 were analyzed. Of the 67 patients, 45 (67.2%) were classified as sepsis, 14 (20.9%) as ARDS, and eight (11.9%) as sepsis-associated ARDS. The patients' information, comprising demographic characteristics, medical history, clinical interventions, daily assessment, clinical outcome, and follow-up data, was properly managed and safely stored in the ARDS/sepsis registry. Data efficiency was guaranteed by performing data collection and data entry twice weekly and every two weeks, respectively. The ARDS/sepsis database that we constructed and manage with REDCap in the ICU can provide a solid foundation for translational research on the clinical data of interest, and a model for development of other medical registries in the future.

  9. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  10. On how to do construction management communications engineering

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhi

    2014-01-01

    In the communication construction projects, improving the efectivenes of project management is an important part of the quality asurance program. The efectivenes of the communication and construction project management is afected by many factors. Therefore, the discusion of communication construction project management efectivenes is good for improving the quality of projects of great significance. This paper analyzes the characteristics and problems of communication construction projects, reflecting the importance of project management; then discused the factors afecting the efectivenes of project management; finaly targeted to improve the communication of construction project management efectivenes propose specific methods to ensure communication quality of construction projects.

  11. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  12. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  13. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  14. Main summaries of construction of the Rovno NPP third unit

    International Nuclear Information System (INIS)

    Smoktij, I.P.; Tsetsenko, I.K.

    1987-01-01

    The main technical and economic indices attained at the Rovno and Zaporozhe NPPs are considered. The estimated costs of the main installations of the building site, organizations participating in construction, labor forces at different building sections, duration of different stages of construction, actual labor costs associated with the reactor unit, volumes of construction and installation work, the construction schedule for the Rovno Unit-3 are given

  15. Formalizing the Process of Constructing Chains of Lexical Units

    Directory of Open Access Journals (Sweden)

    Grigorij Chetverikov

    2015-06-01

    Full Text Available Formalizing the Process of Constructing Chains of Lexical Units The paper investigates mathematical aspects of describing the construction of chains of lexical units on the basis of finite-predicate algebra. Analyzing the construction peculiarities is carried out and application of the method of finding the power of linear logical transformation for removing characteristic words of a dictionary entry is given. Analysis and perspectives of the results of the study are provided.

  16. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Science.gov (United States)

    2010-04-01

    ... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...

  17. STIMULATION OF CONSTRUCTION OF AFFORDABLE HOUSING BY REFORMATION OF A CONSTRUCTION COMPLEX MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    BRONEVYTSKYI S. P.

    2015-10-01

    Full Text Available Purpose. Development of offers on stimulation of construction of affordable housing by reformation of a construction complex management system. Methodology. The revelation of the problems of planning of construction in large cities. The analysis of forming of structure of a build complex management in soviet times and in a transitional period. The revelation of the modern, actual, socio-economic problems of the construction activity management. Proposition on the improvement of methods of construction management in cities of Ukraine. Results. The methods of a construction complex management in countries with a market economy as for building of affordable housing are shown. Originality. In composition of a town-planning documentations, except for the norms of the common use of territories of city (density of population of micro region, the maximum parameters of a construction examining of land areas are proposed to determine: building percent and coefficient of maximum superficial area. Practical value. The principle of management and organization of construction is norms of a build use of territories for building of mass affordable housing for funds of population and investors while providing of the comfort of housing in accordance with state construction norms.

  18. The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies

    Directory of Open Access Journals (Sweden)

    A.Q. Adeleke

    2018-03-01

    Full Text Available Background: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. Methods: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. Results: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. Conclusion: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the

  19. Project Management Unit for decommissioning of NPP Bohunice VI (2003-2014)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-conde, A.; Brochet, I.; Ferreira, A.

    2015-01-01

    From October 2003 until december 2014 the Consortium consisting of Iberdrola Engineering and Construction (leader). Empresarios Agrupados Internacional, and Indra Sistemas has carried out the project Project Management Unit ((PMU) for the decommissioning of Bohunice V1 NPP (units 1 and 2), type VVER-440/V-230 in Slovakia. during the first phase (2003-2007) EdF was also part of the Consortium. The project is funded by the Bohunice International Decommissioning Support Fund (BIDSF) administered by the RBRD. The main objective of the project is to provide the necessary engineering and resources of project management for planning, execution, management, coordination and monitoring of all tasks in support of the decommissioning. (Author)

  20. Internet-based Interactive Construction Management Learning System.

    Science.gov (United States)

    Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy

    2001-01-01

    Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…

  1. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  2. A Construction Management Framework for Mass Customisation in Traditional Construction

    Directory of Open Access Journals (Sweden)

    María Dolores Andújar-Montoya

    2015-04-01

    Full Text Available A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma, together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc..

  3. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  4. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  5. an appraisal of construction management practice in nigeria

    African Journals Online (AJOL)

    user

    Keywords: Construction Project, Management tools, Project delivery, Construction Industry, Nigeria. 1. ..... developing country” International Journal of Project. Management, Vol. 18, Number 3 ... Construction Industry Perspective”, Building &.

  6. Construct Measurement in Management Research

    DEFF Research Database (Denmark)

    Nielsen, Bo Bernhard

    2014-01-01

    Far too often do management scholars resort to crude and often inappropriate measures of fundamental constructs in their research; an approach which calls in question the interpretation and validity of their findings. Scholars often legitimize poor choices in measurement with a lack of availability......, this research note raises important questions about the use of proxies in management research and argues for greater care in operationalizing constructs with particular attention to matching levels of theory and measurement....

  7. Managing Client Values in Construction Design

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2008-01-01

    In construction projects the client will comprise both owner, end-users, and the wider society, representatives of which may have conflicting goals and values; and these may not be fully realized by the stakeholders themselves. Therefore it is a great challenge to capture and manage the values...... for capturing and managing client values within a lean framework. This paper describes the initial findings of a joint research project between academia and industry practitioners that seeks to develop the workshop method to create a state of the art approach in construction design management. This includes...... of the multiple stakeholders that constitutes the “client”. However, seeing client satisfaction as the end-goal of construction it is imperative to make client values explicit in the early project phase and make sure that these values are reflected in all subsequent phases of design and construction...

  8. Methodology to Estimate the Quantity, Composition, and Management of Construction and Demolition Debris in the United States

    Science.gov (United States)

    This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estima...

  9. Discursive construction of polyphony in healthcare management.

    Science.gov (United States)

    Hujala, Anneli; Rissanen, Sari

    2012-01-01

    The aim of the paper is to understand and define how the polyphony of management is constructed in interaction and to describe this through concrete management meeting cases. Polyphony refers to the diverse voices of various organization members, and how these voices are present, disclosed and utilized in management. The study is based on the social constructionist and discursive perspectives of management, which question the traditional, individualistic approaches of management. The issue was examined through a qualitative case study by analysing the micro-level management discourse in three healthcare organizations. Discursive practices that enhance or inhibit polyphony are often unnoticed and unconscious. Key moments of management discourse are an example of unconscious mundane practices through which members of organizations construct the reality of management. The empirical results are locally contextual. In the future, research will be able to apply the approach to diverse contexts as well as link micro-level discourses to the construction of broader health and social management discourses. The paper increases the understanding of how to enhance participation and staff contribution, and how to utilize the knowledge of all members of the organization. Both managers and other staff members are fully involved in the social construction of management. Micro-level discourse should be paid attention to in management work as well as in the education of managers and staff. The study increases the understanding of micro-level issues of management and challenges the conventional, taken-for-granted assumptions behind organization and management theories.

  10. Construction Management for Conventional Facilities of Proton Accelerator

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Cho, Jin Sam; Lee, Jae Sang

    2008-05-01

    Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, audit and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization for adjusting technical issues of overall construction. In this research, We reviewed the basic design and made a detail design of conventional facilities. Preparation for construction license, site improvement and access road construction is fulfilled. Also, we made the technical support for project host as follows : selection of project host organization and host site selection, construction technical work for project host organization and procedure management

  11. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    Science.gov (United States)

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  12. Waste management units - Savannah River Site

    International Nuclear Information System (INIS)

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only

  13. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  14. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  15. Supply Chain Management In Construction Revealed

    OpenAIRE

    Dr. Ghaith Al-Werikat

    2017-01-01

    The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  16. Construction method of pre assembled unit of bolt sphere grid

    Science.gov (United States)

    Hu, L. W.; Guo, F. L.; Wang, J. L.; Bu, F. M.

    2018-03-01

    The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.

  17. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  18. Supply Chain Management In Construction Revealed

    Directory of Open Access Journals (Sweden)

    Dr. Ghaith Al-Werikat

    2017-03-01

    Full Text Available The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  19. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    . Although the conceptual design work may be outsourced, the utilities manage everything else from the infrastructure, the access roads, the supply of utilities to the site (electricity, water, etc.), the site preparation, the general arrangement of the work areas, the interface between contractors, the scheduling of construction activities, at the site, to overseeing the work of all contractors from the safety, quality, scheduling and contractual standpoints. In order to manage and oversee the suppliers' construction works at the site, a considerable number of qualified engineers and inspectors are required. (3) Consequently to the previous two factors, the Japanese electric companies have built nuclear power plants by awarding split-package contracts (the so-called island approach) as well as smaller component contracts. E.g. HEPCO awarded some 150 contracts for the construction of Tomari NPP Unit 3. (4) Given the large number of utilities in Japan, each company built relatively few new nuclear power plants and this has made it difficult to maintain on their own a highly qualified workforce. Fortunately all utilities in Japan have developed and maintained good relationships with one another and willingly share their human resources where the need arises. Salaries and expenditures however continue to be paid by the original employers. This way the host utility can use the borrowed staff for its construction and the lending utility can maintain its qualified engineers for its next construction project.

  20. Life cycle assessment of construction and demolition waste management.

    Science.gov (United States)

    Butera, Stefania; Christensen, Thomas H; Astrup, Thomas F

    2015-10-01

    Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60-95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing that end-of-life impacts and leaching should not be disregarded when assessing environmental impacts from construction products and materials. CO2 uptake in the C

  1. Construction Management for Conventional Facilities of Proton Accelerator

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Cho, Jang Hyung; Cho, Sung Won

    2013-01-01

    Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works such as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, supervision and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization, Gyeongju city, for adjusting technically interrelated work during construction. In this research, We completed the basic, detail, and field changed design of conventional facilities. Acquisition of necessary construction and atomic license, radiation safety analysis, site improvement, access road construction were successfully done as well. Also, we participated in the project host related work as follows: Project host organization and site selection, construction technical work for project host organization and procedure management, etc. Consequently, we so fulfilled all of the own goals which were set up in the beginning of this construction project that we could made contribution for installing and running PEFP's developed 100MeV 20mA linear accelerator

  2. Applying Sensor-Based Technology to Improve Construction Safety Management.

    Science.gov (United States)

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  3. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  4. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  5. Hanford Site waste management units report

    International Nuclear Information System (INIS)

    1993-04-01

    The Hanford Site Waste Management Units Report was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments of the 1984. This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in the report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of the units report, the list of units is more extensive than required by Section 3004(u) of Hazardous and Solid Waste Amendments of the 1984. In Sections 3.0 through 6.0 of this report, the four aggregate areas are subdivided into their operable units. The operable units are further divided into two parts: (1) those waste management units assigned to the operable unit that will be remediated as part of the Environmental Restoration Remedial Actions (ERRA) Program, and (2) those waste management units located within the operable unit boundaries but not assigned to the ERRA program. Only some operable unit sections contain the second part

  6. Nurses’ Experiences of Managing and Management in a Critical Care Unit

    Directory of Open Access Journals (Sweden)

    K. Robyn Ogle

    2014-05-01

    Full Text Available In this article, we describe the major findings of an ethnographic study undertaken to investigate nurses’ experiences of managing nurses and being managed by nurses in an Australian critical care unit. Our purpose was to valorize and make space for nurses to speak of their experiences and investigate the cultural practices and knowledges that comprised nursing management discourses. Subjugated practices, knowledges, and discourses were identified, revealing how nurses were inscribed by, or resisted, the discourses, including their multiple mobile subject positions. Informed by critical, feminist, and postmodern perspectives, nine mobile subject positions were identified. Direct participant observation, participant interviews, and reflective field notes were analyzed for dominant and subjugated discourses. The major finding described is the subject position of “junior novice.” Nurses informed by dominant patriarchal and organizational discourses participated in constructing and reinscribing their own submissive identity reflected in interprofessional relations that lacked individual valuing and undermined their self-esteem.

  7. Nurses’ Experiences of Managing and Management in a Critical Care Unit

    Science.gov (United States)

    Ogle, K. Robyn; Glass, Nel

    2014-01-01

    In this article, we describe the major findings of an ethnographic study undertaken to investigate nurses’ experiences of managing nurses and being managed by nurses in an Australian critical care unit. Our purpose was to valorize and make space for nurses to speak of their experiences and investigate the cultural practices and knowledges that comprised nursing management discourses. Subjugated practices, knowledges, and discourses were identified, revealing how nurses were inscribed by, or resisted, the discourses, including their multiple mobile subject positions. Informed by critical, feminist, and postmodern perspectives, nine mobile subject positions were identified. Direct participant observation, participant interviews, and reflective field notes were analyzed for dominant and subjugated discourses. The major finding described is the subject position of “junior novice.” Nurses informed by dominant patriarchal and organizational discourses participated in constructing and reinscribing their own submissive identity reflected in interprofessional relations that lacked individual valuing and undermined their self-esteem. PMID:28462287

  8. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  9. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  10. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  11. Hanford Site Waste Managements Units reports

    International Nuclear Information System (INIS)

    1992-01-01

    The Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC 1984). This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in this report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. The information in this report is extracted from the Waste Information Data System (WIDS). The WIDS provides additional information concerning the waste management units contained in this report and is maintained current with changes to these units. This report is updated annually if determined necessary per the Hanford Federal Facility Agreement and Consent Order Order (commonly referred to as the Tri-Party Agreement, Ecology et al. 1990). This report identifies 1,414 waste management units. Of these, 1,015 units are identified as solid waste management units (SWMU), and 342 are RCRA treatment, storage, and disposal units. The remaining 399 are comprised mainly of one-time spills to the environment, sanitary waste disposal facilities (i.e., septic tanks), and surplus facilities awaiting decontamination and decommissioning

  12. Using Construction Management for Public and Institutional Facilities.

    Science.gov (United States)

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  13. Hanford Site waste management units report

    International Nuclear Information System (INIS)

    1993-04-01

    The Hanford Site Waste Management Units Report was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments of the 1984. This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in the report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of the units report, the list of units is more extensive than required by Section 3004(u) of Hazardous and Solid Waste Amendments of the 1984. In Sections 3.0 through 6.0 of this report, the four aggregate areas are subdivided into their operable units. The operable units are further divided into two parts: (1) those waste management units assigned to the operable unit that will be remediated as part of the Environmental Restoration Remedial Actions (ERRA) Program, and (2) those waste management units located within the operable unit boundaries but not assigned to the ERRA program. Only some operable unit sections contain the second part.Volume two contains Sections 4.0 through 6.0 and the following appendices: Appendix A -- acronyms and definition of terms; Appendix B -- unplanned releases that are not considered to be units; and Appendix C -- operable unit maps

  14. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  15. Methodical ecologization principles in construction management

    OpenAIRE

    Nuzhina Irina Pavlovna; Yudakhina Olga Borisovna

    2015-01-01

    In the article the subject of ecologization of construction sector is presented, the necessity of ecologization technology and technological processes is proved. The article also presents principles of ecologically friendly management of construction and investment activities and describes these principles in detail.

  16. Determining the essential skill requirements for construction managers' practice in Nigeria

    Directory of Open Access Journals (Sweden)

    Olabode E Ogunsanmi

    2016-12-01

    Full Text Available The study investigates the essential skill requirements for construction managers in Nigeria. The objective is to determine the most important skill requirements for construction managers. A structured questionnaire was administered to construction professionals who worked recently with construction managers in their recently completed projects. Snowballing sampling technique was used to select seventy (70 respondents, however only forty (40 responses were used for the data analysis. The results indicate that essential skills required by the construction managers for their jobs include: procedural-industrial skills, quality assurance/management, listening skills, knowledge of codes and regulations, sustainable skills and ability to learn skills. These skills are important for the construction manager to practice effectively in Nigeria and other developing countries. These findings have seven practical implications to professional bodies, Universities and other trainers of construction managers, whose present curricula may be deficient in knowledge areas in industry (business, managerial, personal and technical. These institutions may need to re-orientate and improve the curricula for newly trained construction managers to cope with current skill requirements. On the other hand, recruiting agencies should ensure that job applicants with the right hard and soft skills are engaged as construction managers. Consequently efficient and effective management of future construction projects in Nigeria and other developing countries can be ensured.

  17. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  18. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  19. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  20. Construction Management: Building Schools Faster in the International Marketplace

    Science.gov (United States)

    Scarano, Joseph J.

    1976-01-01

    Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)

  1. Information systems for material flow management in construction processes

    Science.gov (United States)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  2. Best Practice of Construction Waste Management and Minimization

    Directory of Open Access Journals (Sweden)

    Khor Jie Cheng

    2014-07-01

    Full Text Available Material management is an important issue as seen in construction waste management. Best practice of material management is accompanied by various benefits which are acknowledged by several studies. The site layout has particular effects on both materials and their waste through effective waste management practice. Ignoring the benefits of material management could result in a daily reduction in productivity of up to 40% by material wastage. Thus, the benefits of effective material management must be well comprehended for the sake of waste minimization. Another convincing fact about waste is that poor site management accounts for the largest factor of waste generation. Hence the site condition is very crucial in developing effective material management. Factors contributing to the efficiency of material management process are effective logistical management and supply chain management. The logistics system must be performing as schedule so that materials are wisely managed on-site without encountering presence of excessive materials. As materials management is closely related to logistics in construction projects, there will be delay in construction projects when materials are not delivered to site as scheduled. The management must be effective in terms of delivery, off-loading, storage, handling, on-site transportation and on-site utilization of materials.

  3. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  4. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  5. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    Directory of Open Access Journals (Sweden)

    Larissa A. R. U. Freitas

    2017-07-01

    Full Text Available The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ecology contributions to waste management in industrial construction. The waste management strategies adopted in two industrial construction projects in Brazil are analyzed. The main waste streams generated are identified, recycling and landfilling diversion rates are presented and waste recovery through Industrial Symbiosis is discussed. A SWOT analysis was carried out. Results demonstrate that 9% of the waste produced in one of the projects was recovered through Industrial Symbiosis, while in the other project, waste recovery through Industrial Symbiosis achieved the rate of 30%. These data reveal Industrial Symbiosis’ potential to reduce landfilling of industrial construction wastes, contributing to waste recovery in construction. In addition, results show that industrial construction projects can benefit from the following synergies common in Industrial Ecology place-based approaches: centralized waste management service, shared waste management infrastructure and administrative simplification.

  6. Estimation of construction waste generation and management in Thailand.

    Science.gov (United States)

    Kofoworola, Oyeshola Femi; Gheewala, Shabbir H

    2009-02-01

    This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.

  7. Managing Forest Conflicts: Perspectives of Indonesia’s Forest Management Unit Directors

    Directory of Open Access Journals (Sweden)

    Larry A. Fisher

    2017-04-01

    Full Text Available Recent expansion of the forestry and plantation sectors in Indonesia has intensified agrarian and natural resource conflicts, and created increased awareness of the social, economic and environmental impacts of these disputes. Addressing these disputes is a critical issue in advancing Indonesia’s commitment to sustainable forest management. The Forest Management Units (Kesatuan Pengelolaan Hutan, or KPH, have become the pivotal structural element for managing all state forests at the local level, with responsibility for conventional forest management and policy implementation (establishing management boundaries, conducting forest inventory, and developing forest management plans, as well as the legal mandate to communicate and work with indigenous people and local communities. This paper presents the results of a national survey of all currently functioning KPH units, the first of its kind ever conducted with KPH leadership, to obtain a system-wide perspective of the KPHs’ role, mandate, and capacity for serving as effective intermediaries in managing forest conflicts in Indonesia. The survey results show that the KPHs are still in a very initial stage of development, and are struggling with a complex and rapidly evolving policy and institutional framework. The most common conflicts noted by respondents included forest encroachment, tenure disputes, boundary conflicts, and illegal logging and land clearing. KPH leadership views conflict resolution as among their primary duties and functions, and underscored the importance of more proactive and collaborative approaches for addressing conflict, many seeing themselves as capable facilitators and mediators. Overall, these results juxtapose a generally constructive view by KPH leadership over their role and responsibility in addressing forest management conflicts, with an extremely challenging social, institutional, and political setting. The KPHs can certainly play an important role as local

  8. Enhancing knowledge sharing management using BIM technology in construction.

    Science.gov (United States)

    Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.

  9. Management of construction and demolition wastes as secondary building resources

    Science.gov (United States)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  10. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  11. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  12. Sustainable Management of Construction and Demolition Materials

    Science.gov (United States)

    This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.

  13. Healthcare managers' construction of the manager role in relation to the medical profession.

    Science.gov (United States)

    von Knorring, Mia; Alexanderson, Kristina; Eliasson, Miriam A

    2016-05-16

    Purpose - The purpose of this paper is to explore how healthcare managers construct the manager role in relation to the medical profession in their organisations. Design/methodology/approach - In total, 18 of Sweden's 20 healthcare chief executive officers (CEOs) and 20 clinical department managers (CDMs) were interviewed about their views on management of physicians. Interviews were performed in the context of one aspect of healthcare management; i.e., management of physicians' sickness certification practice. A discourse analysis approach was used for data analysis. Findings - Few managers used a management-based discourse to construct the manager role. Instead, a profession-based discourse dominated and managers frequently used the attributes "physician" or "non-physician" to categorise themselves or other managers in their managerial roles. Some managers, both CEOs and CDMs, shifted between the management- and profession-based discourses, resulting in a kind of "yes, but […]" approach to management in the organisations. The dominating profession-based discourse served to reproduce the power and status of physicians within the organisation, thereby rendering the manager role weaker than the medical profession for both physician and non-physician managers. Research limitations/implications - Further studies are needed to explore the impact of gender, managerial level, and basic profession on how managers construct the manager role in relation to physicians. Practical implications - The results suggest that there is a need to address the organisational conditions for managers' role taking in healthcare organisations. Originality/value - Despite the general strengthening of the manager position in healthcare through political reforms during the last decades, this study shows that a profession-based discourse clearly dominated in how the managers constructed the manager role in relation to the medical profession on the workplace level in their organisations.

  14. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  15. 7 CFR 275.6 - Management units.

    Science.gov (United States)

    2010-01-01

    ... FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Management Evaluation (ME... management unit; (iii) Food Stamp Program participation, including the number of persons and number of... 7 Agriculture 4 2010-01-01 2010-01-01 false Management units. 275.6 Section 275.6 Agriculture...

  16. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  17. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  18. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  19. Hanford Site Waste Management Units Report

    International Nuclear Information System (INIS)

    1991-01-01

    This Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC). The report provides a comprehensive inventory of all types of waste management units at the Hanford Site and consists of waste disposal units, including (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structure, (5) RCRA treatment and storage units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. In support of the Hanford RCRA permit, a field was added to designate whether the waste management unit is a solid waste management unit (SWMU). As SWMUs are identified, they will added to the Hanford Waste Information Data System (WIDS), which is the database supporting this report, and added to the report at its next annual update. A quality review of the WIDS was conducted this past year. The review included checking all data against their reference and making appropriate changes, updating the data elements using the most recent references, marking duplicate units for deletion, and addition additional information. 6 refs

  20. Hanford Site Waste Management Units Report

    International Nuclear Information System (INIS)

    1991-01-01

    This Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC). The report provides a comprehensive inventory of all types of waste management units at the Hanford Site and consists of waste disposal units, including (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment and storage units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. In support of the Hanford RCRA permit, a field was added to designate whether the waste management unit is a solid waste management unit (SWMU). As SWMUs are identified, they will added to the Hanford Waste Information Data System (WIDS), which is the database supporting this report, and added to the report at its next annual update. A quality review of the WIDS was conducted this past year. The review included checking all data against their reference and making appropriate changes, updating the data elements using the most recent references, marking duplicate units for deletion, and adding additional information. 6 refs

  1. Considering Materials Management in Construction: An Exploratory Study

    Directory of Open Access Journals (Sweden)

    Zakaria Dakhli

    2018-03-01

    Full Text Available While materials count for a considerable amount of construction costs, the way materials are managed seems to be improvised rather than approached methodically. This study investigates the practice of novel techniques used to manage materials in the construction industry. Techniques that have already proven themselves to be efficient ways to manage the production pace within the industry include the pull system, Just-In-Time, Kitting and off-site fabrication. These are explained and assessed in the context of the French construction industry through an exploratory study, supported by a questionnaire completed by contractors. The results reveal that a clear plan to manage materials on-site is lacking among the respondents, creating common inventory problems. This research provides evidence to support the central role played by an efficient management of material flow on-site. It also highlights the obstacles that hinder the adoption of innovative techniques, such as sub-contractor coordination.

  2. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  3. Construction quality management principles and good practice

    CERN Document Server

    Watson, Paul

    2011-01-01

    Quality management is essential for facilitating the competitiveness of modern day commercial organizations. Excellence in quality management is a requisite for construction organizations who seek to remain competitive and successful. The challenges presented by competitive construction markets and large projects that are dynamic and complex necessitate the adoption and application of quality management approaches. This textbook is written in line with the ISO 9001:2008 standard and provides a comprehensive evaluation of quality management systems and tools. Their effectiveness in achieving project objectives is explored, as well as applications in corporate performance enhancement. Both the strategic and operational dimensions of quality assurance are addressed by focusing on providing models of best practice. The reader is supported throughout by concise and clear explanations and with self-assessment questions. Practical case study examples show how various evaluative-based quality management systems and t...

  4. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  5. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  6. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  7. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  8. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  9. Life cycle assessment of construction and demolition waste management

    International Nuclear Information System (INIS)

    Butera, Stefania; Christensen, Thomas H.; Astrup, Thomas F.

    2015-01-01

    Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared

  10. Life cycle assessment of construction and demolition waste management

    Energy Technology Data Exchange (ETDEWEB)

    Butera, Stefania, E-mail: stbu@teknologisk.dk; Christensen, Thomas H.; Astrup, Thomas F.

    2015-10-15

    Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared

  11. Innovative quality management practices in the Dutch construction industry

    NARCIS (Netherlands)

    Bossink, B.A.G.

    2002-01-01

    Quality management practices do support the management of strategically important innoυation processes. This conclusion is based on empirical research in the Dutch construction industry. A large-scale innovative construction project is intensively studied during a three-year period. The quality

  12. Challenges encountered by critical care unit managers in the large intensive care units.

    Science.gov (United States)

    Matlakala, Mokgadi C; Bezuidenhout, Martie C; Botha, Annali D H

    2014-04-04

    Nurses in intensive care units (ICUs) are exposed regularly to huge demands interms of fulfilling the many roles that are placed upon them. Unit managers, in particular, are responsible for the efficient management of the units and have the responsibilities of planning, organising, leading and controlling the daily activities in order to facilitate the achievement of the unit objectives. The objective of this study was to explore and present the challenges encountered by ICU managers in the management of large ICUs. A qualitative, exploratory and descriptive study was conducted at five hospital ICUs in Gauteng province, South Africa. Data were collected through individual interviews from purposively-selected critical care unit managers, then analysed using the matic coding. Five themes emerged from the data: challenges related to the layout and structure of the unit, human resources provision and staffing, provision of material resources, stressors in the unit and visitors in the ICU. Unit managers in large ICUs face multifaceted challenges which include the demand for efficient and sufficient specialised nurses; lack of or inadequate equipment that goes along with technology in ICU and supplies; and stressors in the ICU that limit the efficiency to plan, organise, lead and control the daily activities in the unit. The challenges identified call for multiple strategies to assist in the efficient management of large ICUs.

  13. Challenges encountered by critical care unit managers in the large intensive care units

    Directory of Open Access Journals (Sweden)

    Mokgadi C. Matlakala

    2014-04-01

    Full Text Available Background: Nurses in intensive care units (ICUs are exposed regularly to huge demands interms of fulfilling the many roles that are placed upon them. Unit managers, in particular, are responsible for the efficient management of the units and have the responsibilities of planning, organising, leading and controlling the daily activities in order to facilitate the achievement of the unit objectives. Objectives: The objective of this study was to explore and present the challenges encountered by ICU managers in the management of large ICUs. Method: A qualitative, exploratory and descriptive study was conducted at five hospital ICUs in Gauteng province, South Africa. Data were collected through individual interviews from purposively-selected critical care unit managers, then analysed using the matic coding. Results: Five themes emerged from the data: challenges related to the layout and structure of the unit, human resources provision and staffing, provision of material resources, stressors in the unit and visitors in the ICU. Conclusion: Unit managers in large ICUs face multifaceted challenges which include the demand for efficient and sufficient specialised nurses; lack of or inadequate equipment that goes along with technology in ICU and supplies; and stressors in the ICU that limit the efficiency to plan, organise, lead and control the daily activities in the unit. The challenges identified call for multiple strategies to assist in the efficient management of large ICUs.

  14. Repository construction management and quality assurance

    International Nuclear Information System (INIS)

    Hood, F.C.

    1984-01-01

    An emphasis on preventive rather than reactive management is key to an efficient construction management operation. Development of contingency plans to deal with unexpected adverse conditions, e.g., brine pockets during mining operations, are an integral part of the management program to ensure project safety, quality, cost, schedule and environmental objectives are met. A viable quality assurance program with active management support will optimize management effectiveness in reaching project goals. With adequate planning and perceptive application of the proper management controls, Quality Assurance becomes an essential ingredient for efficiently managing a job because it has been built into the management system rather than being an uninvolved peripheral entity. 6 references, 3 figures

  15. Corrective action management unit application for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  16. Corrective action management unit application for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ''Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.'' The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ''package'' for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package

  17. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    OpenAIRE

    Larissa A. R. U. Freitas; Alessandra Magrini

    2017-01-01

    The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ec...

  18. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  19. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  20. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  1. The four roles of supply chain management in construction

    NARCIS (Netherlands)

    Vrijhoef, R.; Koskela, L.

    2000-01-01

    It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies

  2. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  3. Environmental management systems - before, during and after construction

    International Nuclear Information System (INIS)

    Braun, T.L.

    1997-01-01

    The purpose of this paper is to describe an operational environmental managment system (EMS) as developed by TransCanada PipeLines, including an example of the application and concomitant benefits. The focus will be on the planning, construction, inspection and post-construction monitoring programs, covering approximately 3,190 kilometers of large diameter pipeline constructed between 1990 and 1996, across a wide range of Canadian land-uses and ecosystems. With the implementation of such systems, governments have recognized that corporate responsibility and self-management on environmental matters can result in effective, environmentally sound programs that minimize impacts and allow for a more cost-effective and streamlined regulatory approach. (au)

  4. The construction of enterprise content management platform

    International Nuclear Information System (INIS)

    Liu Diyong

    2010-01-01

    The paper introduces the content management platform development background and the construction mode of Sanmen Nuclear Power Co., Ltd. It also proposes the system design architecture, especially focuses on the implementation of the project, the key technical issues and the project management experience. In addition, it describes how to classify, manage and use the unformatted information, digital assets and documents. (author)

  5. Factors Affecting Productivity in the United States Naval Construction Force

    National Research Council Canada - National Science Library

    Morton, Darren

    1997-01-01

    By using a craftsman questionnaire, this thesis identifies and ranks the most important factors impairing Petty Officer productivity and morale in the United States Naval Construction Force (Seabees...

  6. School Construction Management: Expert Administrators Speak.

    Science.gov (United States)

    Fickes, Michael

    2001-01-01

    Presents expert opinion on school construction management communication concerning educational needs, obtaining consensus among diverse groups, and envisioning what schools must offer in the future. Why furniture issues are also important is highlighted. (GR)

  7. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  8. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  9. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  10. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  11. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  12. VALUE-BASED APPROACH TO MANAGING CURRENT ASSETS OF CORPORATE CONSTRUCTION COMPANIES

    Directory of Open Access Journals (Sweden)

    Galyna Shapoval

    2017-09-01

    Full Text Available In modern conditions of management, the value of an enterprise becomes the main indicator, which is learned not only by scientists, but also by owners of enterprise and potential investors. Current assets take a very important place among the factors that affect the value of an enterprise, so management of current assets becomes more acute from the point of their impact on enterprise value. The purpose of the paper is to develop a system of value-based management of corporate construction companies’ current assets. The main tasks are: the study of current assets impact on the value of corporate construction companies, the definition of value-based approach to managing current assets of corporate enterprises and development of value-based management system of corporate construction companies’ current assets by elements. General scientific and special research methods were used while writing the work. Value-based management of current assets involves value-based management of the elements of current assets. The value-based inventory management includes the following stages of management: the assessment of reliability and choice of supplier according to the criterion of cash flow maximization, the classification of stocks in management accounting according to the rhythm of supply and the establishment of periodicity of supplies in accordance with the needs of the construction process. The value-based management of accounts receivable includes the following stages of management: assessment of the efficiency of investment of working capital into accounts receivable, the assessment of customers' loyalty and the definition of credit conditions and monitoring of receivables by construction and debt instruments. Value-based cash management involves determining the required level of cash to ensure the continuity of the construction process, assessing the effectiveness of cash use according to the criterion of maximizing cash flow, as well as budget

  13. Construction safety management guide for use with DOE Order 440.1

    International Nuclear Information System (INIS)

    1997-01-01

    DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule

  14. Critical analysis of procurement techniques in construction management sectors

    Science.gov (United States)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  15. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  16. An Overview of Total Quality Management (TQM) practice in Construction Sector

    Science.gov (United States)

    Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed

    2018-04-01

    In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.

  17. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  18. Assessment of supply chain management in Nigerian construction ...

    African Journals Online (AJOL)

    This paper on assessment of supply Chain Management (SCM) in Effective Project ... in Imo state focused on identifying the challenges of construction supply chain ... and diverse objective were ranked highest whereas unfair risk allocation and poor ... The study recommends that construction stakeholders should embrace ...

  19. A BIM-based approach to reusing construction firm’s management information

    OpenAIRE

    Zhiliang Ma

    2012-01-01

    Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Inf...

  20. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    Science.gov (United States)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  1. Higher Education Change and Its Managers: Alternative Constructions

    Science.gov (United States)

    Hotho, Sabine

    2013-01-01

    This article is based on a case study conducted in the context of UK higher education change. The article argues that "change" is a construct created in discourses of change policy and change management, and resulting in reductivist change management discourses which may impede rather than facilitate effective change management in the…

  2. Hanford Site Waste Management Units Report

    Energy Technology Data Exchange (ETDEWEB)

    Shearer, Jeffrey P. [Hanford Site (HNF), Richland, WA (United States)

    2012-02-29

    The Hanford Site Waste Management Units Report (HSWMUR) has been created to meet the requirements of the Tri-Party Agreement (TPA) Action Plan, Section 3.5, which states: “The Hanford Site Waste Management Units Report shall be generated, in a format agreed upon by the Parties, as a calendar year report and issued annually by the DOE by the end of February of each year, and posted electronically for regulator and public access. This report shall reflect all changes made in waste management unit status during the previous year.” This February 2012 version of the HSWMUR contains a comprehensive inventory of the 3389 sites and 540 subsites in the Waste Information Data System (WIDS). The information for each site contains a description of each unit and the waste it contains, where applicable. The WIDS database provides additional information concerning the sites contained in this report and is maintained with daily changes to these sites.

  3. Hanford Site Waste Management Units Report

    Energy Technology Data Exchange (ETDEWEB)

    Shearer, Jeffrey P. [Hanford Site (HNF), Richland, WA (United States)

    2013-02-13

    The Hanford Site Waste Management Units Report (HSWMUR) has been created to meet the requirements of the Tri-Party Agreement (TPA) Action Plan, Section 3.5, which states: “The Hanford Site Waste Management Units Report shall be generated, in a format agreed upon by the Parties, as a calendar year report and issued annually by the DOE by the end of February of each year, and posted electronically for regulator and public access. This report shall reflect all changes made in waste management unit status during the previous year.” This February 2013 version of the HSWMUR contains a comprehensive inventory of the 3427 sites and 564 subsites in the Waste Information Data System (WIDS). The information for each site contains a description of each unit and the waste it contains, where applicable. The WIDS database provides additional information concerning the sites contained in this report and is maintained with daily changes to these sites.

  4. Hanford Site Waste Management Units Report

    Energy Technology Data Exchange (ETDEWEB)

    Shearer, Jeffrey P. [Hanford Site (HNF), Richland, WA (United States)

    2014-02-19

    The Hanford Site Waste Management Units Report (HSWMUR) has been created to meet the requirements of the Tri-Party Agreement (TPA) Action Plan, Section 3.5, which states: “The Hanford Site Waste Management Units Report shall be generated, in a format agreed upon by the Parties, as a calendar year report and issued annually by the DOE by the end of February of each year, and posted electronically for regulator and public access. This report shall reflect all changes made in waste management unit status during the previous year.” This February 2013 version of the HSWMUR contains a comprehensive inventory of the 3438 sites and 569 subsites in the Waste Information Data System (WIDS). The information for each site contains a description of each unit and the waste it contains, where applicable. The WIDS database provides additional information concerning the sites contained in this report and is maintained with daily changes to these sites.

  5. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  6. Management of waste from packaging of construction materials in building construction works

    OpenAIRE

    González Pericot, Natalia; Río Merino, Mercedes del

    2011-01-01

    Every material arriving at the construction site comes protected in some type of packaging, fundamentally cardboard, plastic or wood, and presently the great majority of these packagings finish in a container mixed with the rest of waste of the construction work. The increasing tendency to use prefabricated materials increases the volume of packaging necessary in product transport; in addition, the traditional materials also arrive more protected with packaging. A specific management for ...

  7. Functioning of primary health care in opinion of managers of primary health care units.

    Science.gov (United States)

    Bojar, I; Wdowiak, L; Kwiatosz-Muc, M

    2006-01-01

    The aim of the research is to get to know opinions of primary health care managers concerning working of primary health care and concerning quality of medical services offered by family doctors out-patient clinics. The research among managers of primary health care units took place in all out-patient clinics in Lublin province. Research instrument was survey questionnaire of authors own construction. Results were statistically analyzed. From 460 surveys sent, 108 questionnaires were accepted to analysis. Majority of managers of out-patient clinics of primary health care is satisfied with the way and the quality of work of employed staff. In opinion of 71.3% of managers access to family doctor services is very good. Availability of primary health care services is better estimated by managers of not public units. The occupied local provide comfortable work for the staff in opinion of 78.5% of surveyed managers of out-patient clinics. Managers estimate the level of their services as very good (37.96%) and good (37.96%) comparing to other such a subjects present in the market. Internal program of improving quality is run in 22% of out-patient clinics, which were investigated. Managers of primary health care units assess the quality of their services as good and very good. They estimate positively the comfort and politeness in serving patients as well as technical status of equipment and the lodging. They assess availability of their services as very good. Large group of managers of family doctors practices recognizes neighborhood practices as a competitors.

  8. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Plant Engineering and Construction System with Knowledge Management: A Case Study in NPP Construction in Hitachi-GE NE

    International Nuclear Information System (INIS)

    Mochida, T.; Hamamoto, M.; Nakamitsu, N.

    2016-01-01

    Full text: Hitachi-GE Nuclear Energy, Ltd. (HGNE) has more than 40 years BWR plants construction experience. The company continues to develop plant engineering system and plant construction systems based on the experience and the lessons learned. Currently, these systems are integrated in a variety of knowledge bases using the latest information technology (IT). Their performance is continuously validated in the recent NPP constructions. Typical examples are shown as case studies for knowledge management. These plant engineering and construction management systems are essential to achieve the on-time and on-budget-goals in NPP construction projects. (author

  10. Risk management in the construction industry: a new literature review

    Directory of Open Access Journals (Sweden)

    Renault Berenger Y.

    2016-01-01

    Full Text Available The construction industry is well known as a highly risk prone industry owing to the complexity of its activities and dynamic project environments generating an atmosphere of risks that must be taken into consideration in the decision process. For this reason, we have developed this treatise to elucidate the fundamentals of risk management through a concise new proposal of literature review for risk management in construction. Our explanation of this is venture is that over the years, this area has been acknowledged as a crucial process in the business institutions and the most discussed subject among experts and researchers in the construction sector. We have tried in this report to present the most recent studies considering the impossibility to present all definitions of the concept of risk. This study is mainly a literature review; it looks at the literature relating to the concept of risk, risk management in construction as well as methods used in construction industry.

  11. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  12. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  13. An appraisal of construction management practice in Nigeria | Ugwu ...

    African Journals Online (AJOL)

    An appraisal of construction management practice in Nigeria. ... 108 questionnaires were distributed to the key construction actors as follows: 45 to ... conflicting design information, effective co-ordination of resources, critical path method, ...

  14. Constructing counterproductive behavior for supporting evironmental management system research

    Science.gov (United States)

    Tiarapuspa; Indyastuti, D. L.; Sari, W. R.

    2018-01-01

    This study aims to explore the definition of counterproductive behavior based on supervisors’ and sub ordinaries’ perceptions. Recently, environmental management system is a strategic tool to gain a competitive advantage. Human resource is the vital factor for successful environmental management system. Counterproductive behavior will destroy environmental management system. Unfortunately, the construct of counterproductive behavior is still debatable. Different culture show different dimensions and indicators of counterproductive behavior. The unclear construct results ambiguous empirical evidence. This study results that many items are included of counterproductive behavior, such as come late, impolite communication, playing gadget in working time, and the other negative behaviors.

  15. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  16. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  17. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  18. Implementation of Risk Management in Malaysian Construction Industry: Case Studies

    OpenAIRE

    Abdul-Rahman, Hamzah; Wang, Chen; Sheik Mohamad, Farhanim

    2015-01-01

    Construction industries are exposed to wide array of risks, such as financial, design, and contractual ones, which might have a direct impact on their performance toward achieving the desired objectives. Risk Management is a proactive decision-making process used to minimize and manage the risks in the most efficient and appropriate manner. However, most construction firms in Malaysia do not apply formal risk management in their projects. Thus, this study aims to identify the actual process o...

  19. High-rise construction in the Russian economy: modeling of management decisions

    Science.gov (United States)

    Miroshnikova, Tatyana; Taskaeva, Natalia

    2018-03-01

    The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.

  20. Lean construction management the Toyota way

    CERN Document Server

    Gao, Shang

    2014-01-01

    The book presents a mixed research method adopted to assess and present the Toyota Way practices within construction firms in general and for firms in China specifically. The results of an extensive structured questionnaire survey based on the Toyota Way-styled attributes identified were developed, and data collected from building professionals working in construction firms is presented. The quantitative data presented in the book explains the status quo of the Toyota Way-styled practices implemented in the construction industry, as well as the extent to which these attributes were perceived for lean construction management. The book highlights all the actionable attributes derived from the Toyota Way model appreciated by the building professionals, but alerts the readers that some attributes felled short of implementation. Further findings from in-depth interviews and case studies are also presented in the book to provide to readers an understanding how these Toyota Way practices can be implemented in real-l...

  1. The context of innovation management in construction firms

    NARCIS (Netherlands)

    Hartmann, Andreas

    2006-01-01

    Conscious management of innovation in construction firms is becoming more and more a necessity. However, the possibilities and ways to successfully put an innovative idea into practice depend on a range of contingencies. A framework of innovation management was devised to structure the context

  2. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  3. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  4. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  5. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  6. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  7. Management units radio physics hospital clinic: New management model?

    International Nuclear Information System (INIS)

    Iborra Oquendo, M.; Angulo Pain, E.; Castro Ramirez, I.; Quinones Rodriguez, L. A.; Urena Llinares, A.; Richarter Reina, J. M.; Lupiani Castellanos, J.; Ramos Caballero, L. I.

    2011-01-01

    Clinical management in the Andalusian Health Service is a process of organizational design that allows professionals to incorporate the management of resources used in their own clinical practice. In the Clinical Management Units activity develops according to different objectives, among them: encourage the involvement of health professionals in managing the centers, enhance continuity of care between the two levels of care, improve work organization and raise patient satisfaction.

  8. A BIM-based approach to reusing construction firm’s management information

    Directory of Open Access Journals (Sweden)

    Zhiliang Ma

    2012-12-01

    Full Text Available Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Information Modeling technology. In the paper, the current approaches are reviewed at first, and then the framework of the new approach is described. Next, the key issues of the new approach are clarified. Finally, a use case of the new approach is demonstrated. It is concluded that the new approach can be used in construction firms to better reuse the accumulated management information.

  9. Occupational safety and health management in the construction industry: a review.

    Science.gov (United States)

    Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin

    2017-09-11

    The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.

  10. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    Science.gov (United States)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  11. Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand.

    Science.gov (United States)

    Manowong, Ektewan

    2012-01-01

    Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.

  12. Construction management research at the interface of design and explanatory science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2011-01-01

    Purpose – The purpose of this study is to characterize construction management research at the interface of explanatory science and design science. Design/methodology/approach – The dual nature of construction management research is analyzed by relating this field of research to natural science,

  13. 20th International Symposium on Advancement of Construction Management and Real Estate

    CERN Document Server

    Zheng, Sheng; Luo, Jiaojiao; Wang, Wei; Mo, Zhibin; Shan, Liping

    2017-01-01

    These conference proceedings offer an outstanding resource for academics and professionals, sharing essential findings on the latest developments in real estate and construction management. The subject is “Advancement of Construction Management and Real Estate” in the context of new-type urbanization. The Chinese Research Institute of Construction Management (CRIOCM), working in close collaboration with Zhejiang University, organized CRIOCM2015, the 20th International Symposium. Written by academics and professionals from all over the world, these proceedings discuss the latest achievements, research outputs and advances between frontier disciplines in the field of construction management and real estate. They cover a wide range of topics, including new-type urbanization, land development and land use, urban development and management, the real estate market and housing policies. The discussions will provide an important reference source on the implementation of new-type urbanization in China and abroad.

  14. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  15. Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.

    Science.gov (United States)

    Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.

    2002-01-01

    Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…

  16. Cultural differences between construction professionals in Denmark and United Kingdom

    DEFF Research Database (Denmark)

    Hancock, M.R.

    /Building Surveyors in relation to the Services Procurement Directive of the European Union. It is recommended that further studies be undertaken in order to develop a cultural profiling model and methods for the building sector to help identify areas of potential conflicts. The report is aimed at construction......This report presents the results of an investigation into cultural differences between professional members of the construction sector of Denmark and the United Kingdom. In particular it refers to differences between Arkitekter/Architects, Civilingeniører/Civil Engineers and Bygningskonstruktører...

  17. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  18. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2018-06-01

    Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  19. Welcoming high reliability organising in construction management

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Doree, Andries G.; Smith, S.D.; Ahiaga-Dagbui, D.D.

    2013-01-01

    To achieve project objectives, construction project managers have to manoeuvre through complex coordination structures. They have to simultaneously deal with limited budgets, tight schedules, demanding stakeholders and a fragmented supply-chain. Despite their extensive coordination efforts, project

  20. HSE management for AP1000 nuclear plant construction in EPC mode

    International Nuclear Information System (INIS)

    He Xiaogang; Wei Zhong

    2010-01-01

    As a new nuclear type, AP1000 will become the development direction of Chinese nuclear project. EPC General Contract mode is favored by nuclear owners both at home and abroad. Therefore, there is necessity for studying HSE management system and method suitable for AP1000 nuclear plant construction (ANPC) based on combination of AP1000 construction characters in EPC mode. This can not only ensure safety for ANPC but also positively promote national nuclear power development. For this reason, based on site HSE management of the first AP1000 nuclear plant under construction, HSE management system and method for ANPC in EPC mode was proposed after analysis of the character of EPC mode and ANPC character. It is hoped that it will be helpful for safe construction for ANPC. (authors)

  1. Logistic description of investment and construction management

    Directory of Open Access Journals (Sweden)

    Sborshchikov Sergey Borisovich

    2014-01-01

    Full Text Available The article is devoted to the questions of defining dynamic behavior of investment and construction activity as a technical and economic system and its formalized description. It is offered to use the term "condition vector" as one of the main characteristics while describing investment and construction activity. Logistic interpretation of a sustainable development of investment and construction defines the concept of optimum trajectory, which considers various dependencies of its components (construction operations, their preparation, design, material, technique, personnel, information, investment, etc.. It is necessary to point out that this state is homeostatic, which means, the managing system must provide continuous monitoring of each system component of investment and construction activities in accordance with the sustainable development pathway. The concept of dynamic balance used in logistics is identical to the concept of homeostatic balance, which is accepted in system engineering. It is defined as a property of technical and economic system, which implies that its deviations from the development pathway lie within admissible values.

  2. A Comparative Study of Effectiveness of Peer Assessment of Individuals' Contributions to Group Projects in Undergraduate Construction Management Core Units

    Science.gov (United States)

    Jin, Xiao-Hua

    2012-01-01

    In recent years, various forms of group work have been introduced in university courses across various subject domains, including construction management courses. Although the use of group work in higher education has sound pedagogical reasons and advantages, group work has its own drawbacks. Therefore, the acceptance by students and the success…

  3. Evaluation of environmental management resources (ISO 14001) at civil engineering construction worksites: a case study of the community of Madrid.

    Science.gov (United States)

    Rodríguez, Gracia; Alegre, Francisco Javier; Martínez, Germán

    2011-07-01

    Management Unit. As a result, the application of EMSs in construction projects often appeared to be more of a formality, which was merely a way of maintaining the certification of the Environmental Management System. It was more a means of meeting the requirements for submitting a tender to contracting organisms rather than an indicator of any real commitment to improving the environmental performance of construction companies. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Improvement of the material and transport component of the system of construction waste management

    Science.gov (United States)

    Kostyshak, Mikhail; Lunyakov, Mikhail

    2017-10-01

    Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.

  5. Organisation Development through Management Development: The United Biscuits Example.

    Science.gov (United States)

    Campbell, Andrew; Winterburn, Den

    1988-01-01

    The success of the strategic management program developed by United Biscuits (United Kingdom) for senior managers resulted from (1) tailoring the program to organizational and individual needs; (2) using company-specific material; (3) involving top management; and (4) using a follow-up program. (JOW)

  6. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  7. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  8. Expanded Organic Building Units for the Construction of Highly Porous Metal-Organic Frameworks

    NARCIS (Netherlands)

    Kong, G.Q.; Han, Z.D.; He, Y.; Qu, S.; Zhou, W.; Yildirim, T.; Krishna, R.; Zou, C.; Chen, B.; Wu, C.D.

    2013-01-01

    wo new organic building units that contain dicarboxylate sites for their self-assembly with paddlewheel [Cu2(CO2)4] units have been successfully developed to construct two isoreticular porous metal-organic frameworks (MOFs), ZJU-35 and ZJU-36, which have the same tbo topologies (Reticular Chemistry

  9. Efficiency potential of management and technical solutions for a construction object

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2014-01-01

    Full Text Available The authors investigate the models of efficiency potential of management and technical solutions for a construction object, which allows accounting for the influence of management-technological and administrative solutions in the process of implementing construction project. The solutions are represented by various factors – solitary integral potentials. The factors, which should be taken into account in the process of developing an integral model, are: development of general contracting structure, project decisions, management decisions, administrative decisions and ecological impact. In is necessary to develop the model, which will integrally put together the above mentioned factors of a construction project, observe and investigate other factors, create a model and get the opportunity not only to predict the endpoint of the future construction object on the stage of formulating technological requirements, but also to monitor the changes of this prognosis in time. The parameters of the integral potential will allow the system to obtain flexibility, which makes it possible to adjust to the changes usually taking place on a construction object and at the same time to aim for optimization of organizational, technological and administrative solutions in the process of reaching endpoint of construction.

  10. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  11. Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico

    International Nuclear Information System (INIS)

    Moore, Darlene R.; Schrader, Scott A.; King, Gabriel G.; Cormier, John

    2000-01-01

    In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million

  12. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  13. Autoclaved aerated concrete : shaping the evolution of residential construction in the United States.

    OpenAIRE

    Bukoski, Steven C.

    1998-01-01

    CIVINS (Civilian Institutions) Thesis document Precast Autoclaved Aerated Concrete (AAC) is a proven construction material used in Europe for over 70 years. Introduced to the United States in 1990, construction thus far is limited to commercial and custom borne applications. Premium benefits include energy efficiency and resistance to natural disaster and pests. Despite being the leading residential construction material in Europe and Japan, lumber is the leading material of choice in the ...

  14. Construct validation of supply chain management in cooperative

    OpenAIRE

    Idris, Nurjihan; Arshad, Fatimah Mohamed; Radam, Alias; Ali, Noor Azman

    2009-01-01

    This study attempts to analyze construct in supply chain and to determine which construct contribute to performance of agricultural cooperatives in Malaysia. The primary data is collected via questionnaire from top level management of agricultural cooperatives using 5-item Likert scale. Factor analysis and structural equations modeling were used to analyze the data. Findings show that cooperatives places importance on quality and technology, logistic, supplier and governance. As a whole, supp...

  15. Fluid management in space construction

    Science.gov (United States)

    Snyder, Howard

    1989-01-01

    The low-g fluids management group with the Center for Space Construction is engaged in active research on the following topics: gauging; venting; controlling contamination; sloshing; transfer; acquisition; and two-phase flow. Our basic understanding of each of these topics at present is inadequate to design space structures optimally. A brief report is presented on each topic showing the present status, recent accomplishings by our group and our plans for future research. Reports are presented in graphic and outline form.

  16. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  17. Probabilistic analysis in the life cycle management of construction deficiencies

    International Nuclear Information System (INIS)

    Zebroski, E.; Starr, C.

    1985-01-01

    The author discusses the urgent need for better systems and procedures for evaluating actual or suspected construction deficiencies in nuclear power plants. The following topics of interest are discussed: summary of tools available, use of plant-specific probabilistic risk assessments, general process for the rational management of construction deficiencies, rationales for the timing of required corrective actions, example of deficiency management in France, proposed screening process, deficiencies calling for corrective actions, institutional obstacles, and specific recommendations

  18. Evolutionary Game Model Study of Construction Green Supply Chain Management under the Government Intervention

    Science.gov (United States)

    Xing, Yuanzhi; Deng, Xiaoyi

    2017-11-01

    The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.

  19. Management self-assessment in construction phase of nuclear power station

    International Nuclear Information System (INIS)

    Shao Bixiu

    2004-01-01

    Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective

  20. Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil.

    Science.gov (United States)

    Penteado, Carmenlucia Santos Giordano; Rosado, Laís Peixoto

    2016-10-01

    Brazil, as a result of economic development and strengthening of the construction industry in recent years, is generating an increasing amount of construction and demolition waste (CDW). Hence, environmental assessment of the management systems is vital. A life cycle assessment (LCA) is presented of CDW management in a medium-sized municipality located in the southeast region of Brazil, where the impacts of leaching were not considered due to absence of consistent data. Six different proposed scenarios for the current CDW management situation have been considered. These scenarios comprised the combined use of landfilling, sorting, and recycling, and the use of CDW as paving material for landfill roads, in different percentages. Considering 0.8 ton of waste as the functional unit, the life cycle inventory was performed using primary data obtained from field survey and secondary data from the database Ecoinvent version 3.1, and from the literature. The method CML 2 baseline 2001 was used for environmental impacts evaluation. The results highlight that recycling is beneficial when efficient CDW sorting takes place at construction sites, avoiding the transport of refuse to sorting and recycling facilities, and the distance between the generation source and the recycling unit is within 30 km. Thus, our results are helpful to ensure that the decision-making processes are based on environmental and technical aspects, and not only on economic and political factors, and also provide data and support for other LCA studies on CDW. © The Author(s) 2016.

  1. On the effectiveness in implementing a waste-management-plan method in construction

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method

  2. Strategies, methods and tools for managing nanorisks in construction

    Science.gov (United States)

    López de Ipiña, J. M.; Vaquero, C.; Boutry, D.; Damlencourt, J. F.; Neofytou, P.; Pilou, M.; Jankowska, E.; Larraza, I.; Pina, R.; Fernández, S.; Contreras, S.; Romero, A.; Calderon, M.; Swiezewsk, P.; Otkallo, K.; Pintea, A.; Salazar, C.; Oroz, T.; Hargreaves, B.; Ciobanu, R.; Tabrea, A.; Hazebrouck, B.; Salvi, O.; Stockmann-Juvala, H.; Vaananen, V.; Pui, D. H. Y.; Thompson, Drew

    2015-05-01

    This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO2, SiO2, carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies.

  3. Strategies, methods and tools for managing nanorisks in construction

    International Nuclear Information System (INIS)

    De Ipiña, J M López; Vaquero, C; Boutry, D; Damlencourt, J F; Neofytou, P; Pilou, M; Jankowska, E; Larraza, I; Pina, R; Fernández, S; Contreras, S; Romero, A; Calderon, M; Swiezewsk, P; Otkallo, K; Pintea, A; Salazar, C; Oroz, T; Hargreaves, B; Ciobanu, R

    2015-01-01

    This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO 2 , SiO 2 , carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies. (paper)

  4. MANAGEMENT OF RISKS BASED ON INTERACTION BETWEEN CONSTRUCTION EXPERT AND CUSTOMER ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Александр Васильевич Харитонович

    2016-02-01

    Full Text Available The paper describes problems connected to management of risk and key characteristics of interaction of construction expert and organization-customer of expert services. We have conducted the analysis of different schemes used for management of risk, their advantages and disadvantages. In addition authors describe the main opportunities that appear in the organization as a result of the systematic engagement of an external expert at different stages of investment and construction project (getting recommendations aimed at improving of the organization adaptability to changes and risks; improving the efficiency of management of investment and construction projects etc..

  5. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  6. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  7. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  8. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  9. The comparison of license management procedure for nuclear power plant in China and United States

    International Nuclear Information System (INIS)

    Yu Zusheng

    2006-01-01

    'Tow steps' license management procedure for nuclear power plant has been performed bas- ted on the requirement of 10CFR Part50-DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES in United States since last century fifties. In order to ulterior reduce the risk of investment and technical for new construction nuclear power plants, new regulations 'One step' license management procedure-10CFR Part52-EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS issued in 1989. The new regulations has been adopted by new design of nuclear power plant, for example AP1000. ‘The similar tow steps’ license management procedure for nuclear power plant has been performed basted on the requirement of HAFO01/01 Rules for the Implementation of Regulations on the Safety Regulation for Civilian Nuclear Installations of the People's Re- public of China Part One: Application and Issuance of Safety License for Nuclear Power Plant (December 1993) in China since last century nineties. This article introduces and compares the requirements and characteristics of above license management procedure for nuclear power plant in China and United States. (author)

  10. Construction of test-bed system of voltage management system to ...

    African Journals Online (AJOL)

    Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.

  11. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    Science.gov (United States)

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    Directory of Open Access Journals (Sweden)

    Tsenguun Ganbat

    2018-01-01

    Full Text Available International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 peer-reviewed journal articles for the years 2007–2017. Thus five steps of bibliometric analysis were conducted based on the proposed frameworks of BIM risk management in international construction (BIM-RM-INTL. The results show that the popularization of BIM not only attracts all stakeholders’ interests but also brings some risks. For example, financial factors are hard to detect and control through BIM, information loss during transmission stands out, and BIM has no unified standards and regulations for international construction. The research has mapped existing research results and their relationships for future risk management in BIM-enabled international construction.

  13. Trend-Analysis and Research Direction in Construction Management Literature

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    Planning and scheduling, both in the form of pre-assembly construction as well as increase in cost and time are all themes that haven’t been studies in a trend-analysis, with the purpose of finding gaps and research directions in the literature. The aim of this paper is therefor to analyze...... of Construction Engineering and Management....

  14. The innovation and application of the nuclear power construction management information system MISNPC

    International Nuclear Information System (INIS)

    Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua

    2009-01-01

    This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)

  15. Assessing the Performance of Business Unit Managers

    NARCIS (Netherlands)

    Bouwens, J.F.M.G.; van Lent, L.A.G.M.

    2006-01-01

    Using a sample of 140 managers, we investigate the use of various performance metrics in determining the periodic assessment, bonus decisions, and career paths of business unit managers.We show that the weight on accounting return measures is associated with the authority of these managers, and we

  16. Elementary Introduction to the Green Management of the Construction in Whole Process

    Science.gov (United States)

    Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi

    Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.

  17. End-to-end requirements management for multiprojects in the construction industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    Performance Concrete and insulation materials – is used. By means of action research and interviews of case project staff it has become evident that many elements of formalized requirements management are missing in the case project. To fill those gaps and be able to manage requirements end...... with regards to requirements management. As the literature study gives little new information, a series of interviews are initiated with experts from industry and universities. Those interviews reveal major shortcomings in the way requirements are handled in Danish construction companies today. In order...... to give managers of construction projects a useful and guiding tool for formally managing requirements that is rooted in practice, the “Conceptual requirements management framework”, is created. The framework builds upon the gathered empirical data, obtained by action research, interviews, and available...

  18. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  19. Construct Validation of the Behavior and Instructional Management Scale

    Science.gov (United States)

    Martin, Nancy K.; Sass, Daniel A.

    2010-01-01

    Beliefs related to classroom management vary among teachers and play an important role in classrooms. Despite the importance of this construct, valid measures have proven difficult to develop. This study evaluated the psychometric properties of the Behavior and Instructional Management Scale (BIMS), a short but valid measure of teachers'…

  20. Quality assurance and supervision of mass concrete construction under EPC mode

    International Nuclear Information System (INIS)

    Peng Hong

    2013-01-01

    Taking one typical general contraction project-Hainan Changjiang nuclear power project as an example, this paper introduces the mass concrete construction of nuclear island foundation of Unit 1 in its installation phase, elaborates how to conduct quality assurance and supervision for concrete production, construction, supervision and management, detects relevant weak points of quality and management in the mass concrete construction through quality assurance supervision, puts forward management requirements for the supervising organizations, accumulates useful experience on how to promote contractors to implement the contract in line with national laws, regulations and to improve the management in equipment installation, commissioning and acceptance. (authors)

  1. Unit 1 and Unit 2 Nuclear Power Plant Mochovce construction finishing from primary contractor of technological part. Skoda Praha a. s. point of view

    International Nuclear Information System (INIS)

    Horky, F.

    2000-01-01

    In this paper the history of delivery of technological part for NPP V-1 Mochovce as well as of reconstruction and safety improvements by the Skoda Praha a.s. is presented. Primary contractor of technological part Skoda Praha together with its final suppliers proved ability to realize under hard conditions such a complicated work what was indisputedly Units 1 and 2 finishing. Company proved capability to conform itself flexibly in the course of work to requirements of customer for realization of safety measures which means that Units 1 and 2 fully satisfy international standards. By fulfilment of primary contractor of technology obligations and above all by takeover of complex responsibility for both Units putting in operation including responsibility for 'past' Skoda Praha put away one of basic problems which occurred in decision making to whom will be assigned construction finishing contract. These facts fully qualify Skoda Praha to be selected for possible Units 3 and 4 construction finishing as one of chief construction finishing participant

  2. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  3. Care management in nursing within emergency care units

    Directory of Open Access Journals (Sweden)

    Roberta Juliane Tono de Oliveira

    2015-12-01

    Full Text Available Objective.Understand the conditions involved in the management of nursing care in emergency care units. Methodology. Qualitative research using the methodological framework of the Grounded Theory. Data collection occurred from September 2011 to June 2012 through semi-structured interviews with 20 participants of the two emergency care units in the city of Florianopolis, Brazil. Results. Hindering factors to care management are: lack of experience and knowledge of professionals in emergency services; inadequate number of professionals; work overload of emergency care units in the urgent care network; difficulty in implementing nursing care systematization, and need for team meetings. Facilitating factors are: teamwork; importance of professionals; and confidence of the nursing technicians in the presence of the nurse. Conclusion. Whereas the hindering factors in care management are related to the organizational aspects of the emergency care units in the urgency care network, the facilitating ones include specific aspects of teamwork.

  4. Care management in nursing within emergency care units.

    Science.gov (United States)

    Tono de Oliveira, Roberta Juliane; Vieira Hermida, Patrícia Madalena; da Silva Copelli, Fernanda Hannah; Guedes Dos Santos, José Luís; Lorenzini Erdmann, Alacoque; Regina de Andrade, Selma

    2015-12-01

    Understand the conditions involved in the management of nursing care in emergency care units. Qualitative research using the methodological framework of the Grounded Theory. Data collection occurred from September 2011 to June 2012 through semi-structured interviews with 20 participants of the two emergency care units in the city of Florianopolis, Brazil. Hindering factors to care management are: lack of experience and knowledge of professionals in emergency services; inadequate number of professionals; work overload of emergency care units in the urgent care network; difficulty in implementing nursing care systematization, and need for team meetings. Facilitating factors are: teamwork; importance of professionals; and confidence of the nursing technicians in the presence of the nurse. Whereas the hindering factors in care management are related to the organizational aspects of the emergency care units in the urgency care network, the facilitating ones include specific aspects of teamwork.

  5. Analysis of Informationization Construction of Business Financial Management under the Network Economy

    Science.gov (United States)

    Dong, Yahui; Zhang, Pengwei; Li, Wei

    To strengthen the informationization construction of the financial management has great significance to the achievement of business management informationization, and under the network economic environment, it is an important task of the financial management that how to conduct informationization construction of traditional financial management to provide true, reliable and complete financial information system for the business managers. This paper thoroughly researches the problem of financial information orientation management (FIOM) by taking the method of combining theory with practice. This paper puts forward the thinking method of financial information management, makes the new contents of E-finance. At last, this paper rebuilds the system of finance internal control from four aspects such as control of organization and management, system development control and safety control of network system.

  6. Managing Conflict in The Nigerian Construction Industry: A Study of ...

    African Journals Online (AJOL)

    The study investigated the causes of conflictin the Nigerian construction industry and, the strategies for managing them in terms of resolutions and prevention. A quantitative approach using questionnaire survey was adopted to empirically test the opinions of construction professionals on causes of conflicts and ...

  7. Health care units and human resources management trends.

    Science.gov (United States)

    André, Adriana Maria; Ciampone, Maria Helena Trench; Santelle, Odete

    2013-02-01

    To identify factors producing new trends in basic health care unit management and changes in management models. This was a prospective study with ten health care unit managers and ten specialists in the field of Health in São Paulo, Southeastern Brazil, in 2010. The Delphi methodology was adopted. There were four stages of data collection, three quantitative and the fourth qualitative. The first three rounds dealt with changing trends in management models, manager profiles and required competencies, and the Mann-Whitney test was used in the analysis. The fourth round took the form of a panel of those involved, using thematic analysis. The main factors which are driving change in basic health care units were identified, as were changes in management models. There was consensus that this process is influenced by the difficulties in managing teams and by politics. The managers were found to be up-to-date with trends in the wider context, with the arrival of social health organizations, but they are not yet anticipating these within the institutions. Not only the content, but the professional development aspect of training courses in this area should be reviewed. Selection and recruitment, training and assessment of these professionals should be guided by these competencies aligned to the health service mission, vision, values and management models.

  8. Positive experience in the construction and project management of Kashiwazaki-Kariwa no. 6 and no. 7

    International Nuclear Information System (INIS)

    Minematsu, A.

    1999-01-01

    Kashiwazaki-Kariwa No.6 and No.7 (K-6/7), the world first Advanced Boiling Water Reactor (ABWR) units, started commercial operations on November 7, 1996 and July 2, 1997 respectively. ABWR has been developed as a standard design of the next generation BWR to meet common goals set by the Japanese electric utilities and BWR manufacturers (GE, Hitachi and Toshiba) based on our design, construction, operation and maintenance experience of nuclear power plants. The construction of K-6/7 and confirmatory tests for the verification of the first-of-a-kind (FOAK) design features of ABWR were conducted smoothly without any delay. The duration of the construction was 51.5 months. It was shorter than conventional BWRs in Japan by nearly one year. This was realized by design features of ABWR for better constructability, a principle of 'test before use' applied to the FOAKs, advanced construction technology, detailed engineering at very early stages of the project, and good construction management. The positive experience in the K-6/7 project is now being reviewed and standardized for next ABWR projects. The data and knowledge accumulated through the K-6/7 project will be utilized effectively with the aide of the latest information technology. (author)

  9. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  10. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  11. DRUG MANAGEMENT REVIEWS IN DISTRICT DRUG MANAGEMENT UNIT AND GENERAL HOSPITAL

    Directory of Open Access Journals (Sweden)

    Max Joseph Herman

    2009-12-01

    Full Text Available Drug is one of the essential elements in healthcare that should be effectively and efficiently managed. Following thedecentralization in 2001 in Indonesia, drug management has changed in district drug management units and also in District General Hospitals. Certainly this condition influences the sustainability of drug access in primary health care such as in Community Health Center and District General Hospital, especially in drug financing policy. A cross sectional descriptive study to obtain information on drug management in public healthcare in district had been carried out between July and December 2006 in 10 District Public Drug Management Units from 10 district health offices and 9 district general hospitals as samples. Data were collected by interviewing heads of Drug Section in District Health Offices and heads of Hospital Pharmacies using structured questionnaires and observing drug storage in District Drug Management Units, Community Health Centers, and Hospital Pharmacies. Results of the study show that drug planning in District Health Offices and General Hospitals did not meet the basic real need in some districts nor District Hospitals. The minimum health service standards had no been achieved yet. Furthermore, drug procurement, storage and recording as well as reporting was not good enough either, such as shown by the existence of expired drugs. Lead time for drug delivery to community health centers in some districts was longer than the average of lead time in the past 3 years.

  12. A comparative study of Japan and United States nuclear enterprise: Industry structure and construction experience

    International Nuclear Information System (INIS)

    Hinman, G.W.; Lowinger, T.C.

    1987-01-01

    Both Japan and the United States have undertaken major programs to utilize nuclear power for central station electricity generation. Over the past 20 years, the Japanese have developed their own construction and government regulatory institutions and now have an essentially independent domestic nuclear power program. Nuclear construction and government oversight of nuclear power have developed somewhat differently in Japan and the United States, reflecting to some extent the two countries' different business and social cultures. In the United States the vendor and utility industries are much more fragmented than those in Japan, and construction projects are carried out on a more competitive basis. The Japanese industry operates through a few well-established consortia while the U.S. industry does not. Relations among the national government, the vendors, and the electric utilities tend to be cooperative in Japan while they are more adversarial in the Untied States. This paper discusses these topics in a framework of a comparative study of the countries' nuclear industries. Whether because of the factors mentioned above or for other reasons the success of nuclear power in Japan and the United States has differed dramatically in recent years. This paper compares the performance of the nuclear enterprise in these two countries in terms of the physical attributes of the plants themselves, the labor required to build them, and the construction times required. It also discusses the relationship between initial estimates of costs and schedules and actual results achieved. On all counts, recent Japanese performance has been better than in the United States

  13. Construction of APR1000 nuclear power information management system based on international standards

    International Nuclear Information System (INIS)

    Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang

    2010-01-01

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  14. Construction of APR1000 nuclear power information management system based on international standards

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)

    2010-10-15

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  15. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  16. Implementing a Nurse Manager Profile to Improve Unit Performance.

    Science.gov (United States)

    Krugman, Mary E; Sanders, Carolyn L

    2016-06-01

    Nurse managers face significant pressures in the rapidly changing healthcare environment. Staying current with multiple sources of data, including reports that detail institutional and unit performance outcomes, is particularly challenging. A Nurse Manager Customized Profile was developed at a western academic hospital to provide a 1-page visual of pertinent data to help managers and director supervisors focus coaching to improve unit performance. Use of the Decisional Involvement Scale provided new insights into measuring manager performance.

  17. Auditing of suppliers as the requirement of quality management systems in construction

    Science.gov (United States)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  18. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  19. The new VLT-DSM M2 unit: construction and electromechanical testing

    Science.gov (United States)

    Gallieni, Daniele; Biasi, Roberto

    2013-12-01

    We present the design, construction and validation of the new M2 unit of the VLT Deformable Secondary Mirror. In the framework of the Adaptive Optics Facility program, ADS and Microgate designed a new secondary unit which replaces the current Dornier one. The M2 is composed by the mechanical structure, a new hexapod positioner and the Deformable Secondary Mirror unit.The DSM is based on the well proven contactless, voice coil motor technology that has been already successfully implemented in the MMT, LBT and Magellan adaptive secondaries, and is considered a promising technical choice for the E-ELT M4 and the GMT ASM. The VLT adaptive unit has been fully integrated and, before starting the optical calibration, has completed the electromechanical characterization, focused on the dynamic performance. With respect to the previous units we introduced several improvements, both in hardware and control architecture that allowed achieving a significant enhancement of the system dynamics and reduction of power consumption.

  20. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  1. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  2. Causal Factors of Corruption in Construction Project Management: An Overview.

    Science.gov (United States)

    Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming

    2017-11-11

    The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as

  3. Exploration and practice of data management in information construction of Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Jiang Lirui; Wang Yinhui; Liu Feng; Zhu Yunfei; Song Jili

    2014-01-01

    The paper introduces the exploration and practices in TNPS data management system construction, data management system maturity model construction, management system maturity self-evaluation and data quality improvement, etc. Through the identification and illustration on TNPS data management functions and it also illustrates the effect of scientific management on the enterprise operation with the combination of the characteristics of Big Data Time. Then it looks into the prospect of the data management. (authors)

  4. Construction schedule management of China Experimental Fast Reactor

    International Nuclear Information System (INIS)

    Wang Yue

    2012-01-01

    China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)

  5. Using management inquiry to co-construct other memories about the future

    DEFF Research Database (Denmark)

    Larsen, Mette Vinther; Willert, Søren

    2017-01-01

    on the acknowledgment that people in organizations have memories of the future. And it is argued that the prospective memories managers have of how an organizational dilemma will unfold in the nearby future shape their actions and co-construction of meaning in the present. In the article, we exemplify and explore how......The focal point in this article is to explore how management inquiry in the context of reflexive dialogical action research can be used as a way for researchers and managers to jointly construct knowledge that partakes in developing organizational life from “within.” This article builds...... researchers and managers by using “unadjusted responses” and “social poetics” as ways of gesturing and responding can engage in management inquiry and enhance the future managers remember to make room for more desirable future memories to emerge that expand managers’ possible space for action in the present....

  6. Analysis of factors influencing safety management for metro construction in China.

    Science.gov (United States)

    Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B

    2014-07-01

    With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    OpenAIRE

    Ganbat, Tsenguun; Chong, Heap-Yih; Liao, Pin-Chao; Wu, You-Di

    2018-01-01

    International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM) emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 pee...

  8. The use of production management techniques in the construction of large scale physics detectors

    International Nuclear Information System (INIS)

    Bazan, A.; Chevenier, G.; Estrella, F.

    1999-01-01

    The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Workflow Management Software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an Information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector construction. This is the first time industrial production techniques have been deployed to this extent in detector construction

  9. Assessment of different construction and demolition waste management approaches

    Directory of Open Access Journals (Sweden)

    Manal S. Abdelhamid

    2014-12-01

    Full Text Available The waste generated from construction and demolition sites is considered one of the most irritating problems in Egypt. In the last 10 years some effort has been made toward solving this problem, the most outstanding is the newly issued Egyptian rating system “Green Pyramids Rating System”. It emphasizes on waste management and particularly “site provision and environment” which contributes to 75% of the management category score. However the traditional practice which is limited to dumping all the generated waste is still dominating. The absence of sustainable practices in construction sector in Egypt led to the lack in financial and environmental data. From strategic perspective, the research aims at developing a detailed procedure to evaluate two construction and demolition waste management approaches by means of Decision Matrix technique. A detailed study is introduced for the two approaches; for each approach a flow chart is developed to demonstrate its lifecycle, as well as the cost break down structure and the different stakeholders’ roles. A penetration discussion of the pros and cons for each approach was developed accordingly and came out with sixteen influencing attributes for both approaches. The previous steps paved the ground to construct a Decision Matrix to decide on one of the approaches from a strategic environmentally oriented perspective. The study relied on the detailed and deep demonstration of the two approaches to justify the assigned weight for attributes and scores for corresponding approach. From a strategic perspective, the decision came out in favor of the more environmentally friendly approach.

  10. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  11. The Measurement of Time: Children's Construction of Transitivity, Unit Iteration, and Conservation of Speed.

    Science.gov (United States)

    Long, Kathy; Kamii, Constance

    2001-01-01

    Interviews 120 children in kindergarten and grades 2, 4, and 6 with five Piagetian tasks to determine the grade level at which most have constructed transitive reasoning, unit iteration, and conservation of speed. Indicates that construction of the logic necessary to make sense of the measurement of time is generally not complete before sixth…

  12. System dynamic modeling on construction waste management in Shenzhen, China.

    Science.gov (United States)

    Tam, Vivian W Y; Li, Jingru; Cai, Hong

    2014-05-01

    This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.

  13. Care management in nursing within emergency care units

    OpenAIRE

    Roberta Juliane Tono de Oliveira; Patrícia Madalena Vieira Hermida; Fernanda Hannah da Silva Copelli; José Luís Guedes dos Santos; Alacoque Lorenzini Erdmann; Selma Regina de Andrade

    2015-01-01

    Objective.Understand the conditions involved in the management of nursing care in emergency care units. Methodology. Qualitative research using the methodological framework of the Grounded Theory. Data collection occurred from September 2011 to June 2012 through semi-structured interviews with 20 participants of the two emergency care units in the city of Florianopolis, Brazil. Results. Hindering factors to care management are: lack of experience and knowledge of professionals in emergency se...

  14. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  15. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  16. Managing Natural Resources for Sustainable Livelihoods: Uniting ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2003-07-31

    Jul 31, 2003 ... Management of local resources has a greater chance of a ... Managing Natural Resources for Sustainable Livelihoods: Uniting Science and Participation ... innovative approaches for establishing and sustaining participation and ... A new IDRC-supported project will help improve water conservation and ...

  17. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  18. Positioning and Priorities of Growth Management in Construction Industrialization: Chinese Firm-Level Empirical Research

    Directory of Open Access Journals (Sweden)

    Jingxiao Zhang

    2017-06-01

    Full Text Available The purpose of this research is to quantitatively evaluate the growth phase, position, and priorities of the industrialization policy management of the construction industry at firm level. The goal is to integrate quantitative dynamics into the policy-making process for sustainable policy development in future China. This research proposes an integrated framework, including growth management model and industrial policy evaluation method, to identify the challenges of construction industrialization and policy management. The research applies the mixed system method, which includes entropy method and average score method, to analyze the growth stage and major impact indexes targeting 327 survey samples. The empirical results show that the proposed conceptual framework and policy evaluation method could effectively determine the growth position and directions of the construction industrialization. For verification purpose, the study uses the local industry data from Shaanxi Province, China. The calculation results substantiate that the construction industry is in the middle section of the third growth phase. The comparison of the results from statistical methods shows that the local construction industry still needs substantial effort in policy management to improve its sustainable industrialization level. As countermeasures, the policy priorities should concentrate on: (1 enhancing effective cooperation among universities, research institutions and enterprises; (2 improving actions towards technology transfer into productivity; and (3 encouraging market acceptance of construction industrialization. This research complements the existing literature of policy evaluation of construction industrialization. Moreover, it provides theoretical and operational steps on industry policy evaluation and growth management framework, with accurate and ample data analysis on firm-level survey. Researchers and policy makers can use this research for further

  19. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  20. Present status of Tomari No.3 unit construction and efforts for preventing global warming

    International Nuclear Information System (INIS)

    Ouchi, Tamotsu; Sakai, Ichiro; Makino, Takeshi

    2009-01-01

    Hokkaido Electric Power Company, Inc. (HEPCO) supplies electricity to almost all area of Hokkaido. Its service area accounts for about one-fifth of Japan's area, on the other hand, the population of the service area only accounts for 4.4% of the nation. This means Hokkaido's nature is precious, and one of HEPCO's missions is to protect such environment, with providing stable electricity. Therefore, nuclear power, which does not emit greenhouse effect gas for generation, is becoming more important. HEPCO's operating nuclear power stations are Tomari No.1 unit and No.2 unit. Their generation capacity is 579 MW respectively. Now, No.3 unit is under construction. Its generation capacity is 912 MW and it will be operational in December 2009. In Hokkaido, about one fourth of electricity is now produced by nuclear power, however, after Tomari No.3 is completed, more than 40% of electricity will be produced by nuclear. So, Tomari No.3 unit will contribute stable supply of electricity in the first half of 21st century and prevent global warming in Hokkaido. This paper describes the present status of Tomari No.3 unit construction with major specifications and our efforts to prevent global warming. (author)

  1. Present status of Tomari No.3 unit construction and efforts for preventing global warming

    International Nuclear Information System (INIS)

    Ouchi, Tamotsu

    2008-01-01

    Hokkaido Electric Power Company, Inc. (HEPCO) supplies electricity to almost all area of Hokkaido. Its service area accounts for about one-fifth of Japan's area, on the other hand, the population of the service area only accounts for 4.4% of the nation. This means Hokkaido's nature is precious, and one of HEPCO's missions is to protect such environment, with providing stable electricity. Therefore, nuclear power, which does not emit greenhouse effect gas for generation, is becoming more important. HEPCO's operating nuclear power stations are Tomari No.1 unit and No.2 unit. Their generation capacity is 579 MW respectively. Now, No.3 unit is under construction. Its generation capacity is 912 MW and it will be operational in December 2009. In Hokkaido, about one fourth of electricity is now produced by nuclear power, however, after Tomari No.3 is completed, about 40% of electricity will be produced by nuclear. So, Tomari No.3 unit will contribute stable supply of electricity in the first half of 21st century and prevent global warming in Hokkaido. This paper describes the present status of Tomari No.3 unit construction with major specifications and our efforts to prevent global warming. (author)

  2. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  3. An Analysis of Enterprise Risk Management and IT Effectiveness Constructs

    Science.gov (United States)

    Waithe, Errol

    2016-01-01

    One major problem many organizations are facing is balancing the risk-management practices of the organization with overall information technology (IT) effectiveness. The purpose of this non-experimental quantitative correlational study was to assess the constructs and correlations associated with enterprise risk management and IT effectiveness.…

  4. Cernovoda construction on target for Unit 1 startup in 1994

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    AECL and the Italian company Ansaldo have formed a joint venture to complete the first unit of the five-unit station at Cernovoda, with AECL assuming overall project management. Financing of the project is being provided jointly, with $315 million form the Canadian Export Development Corp. and $175 million from the Italian government. First criticality is scheduled for October 1994, and connection to the grid in December 1994. When complete, Cernovoda will supply 30% of Romania's electricity

  5. Cooperation in Construction:

    DEFF Research Database (Denmark)

    Vogelius, Peter; Storgaard, Kresten

    2016-01-01

    The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed the communic......The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed...... the companies in the case can be understood as possessing a social capital which is enforced and united by initiatives of the main contractor. The social capital was built up and maintained through the actual constitution of cooperation already in the initial phase of bidding before the building process....... The management logic of the main contractor is interpreted as based on a sociology-inspired understanding focusing on norms and social values rather than on contractual (law) and functional (engineering) logic, which had hitherto been prevalent in Danish construction management....

  6. Putting into practice error management theory: Unlearning and learning to manage action errors in construction.

    Science.gov (United States)

    Love, Peter E D; Smith, Jim; Teo, Pauline

    2018-05-01

    Error management theory is drawn upon to examine how a project-based organization, which took the form of a program alliance, was able to change its established error prevention mindset to one that enacted a learning mindfulness that provided an avenue to curtail its action errors. The program alliance was required to unlearn its existing routines and beliefs to accommodate the practices required to embrace error management. As a result of establishing an error management culture the program alliance was able to create a collective mindfulness that nurtured learning and supported innovation. The findings provide a much-needed context to demonstrate the relevance of error management theory to effectively address rework and safety problems in construction projects. The robust theoretical underpinning that is grounded in practice and presented in this paper provides a mechanism to engender learning from errors, which can be utilized by construction organizations to improve the productivity and performance of their projects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. Constructing collaboration and management platform with spring+ hibernate

    International Nuclear Information System (INIS)

    Zhang Hongmei; Ou Ge; Nie Jianyin; Song Liming; Chen Gang

    2007-01-01

    HCMP is the platform of collaboration and management for HXMT. The documents of HXMT project are the main context of HCMP. Besides the users of HXMT project, HCMP also serves other users. HCMP adopts the hierarchy Web structure to implement context release, documents approval, project management and portal website. HCMP provides the support of informatlization and standardization for HXMT project. This paper adopts Spring + Hibernate technique to construct the J2EE architecture, based on which HCMP is implemented. (authors)

  8. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  9. ROW (Right-of-Way) interfering construction activities management program

    Energy Technology Data Exchange (ETDEWEB)

    Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)

  10. The method of using current regulations and standards in designing management and technologies of construction

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.

  11. AREVA Logistics Business Unit Transportation Risk Management Initiative

    International Nuclear Information System (INIS)

    Anne, C.

    2009-01-01

    A safe, secure and reliable transportation organization is a key component for the success of the nuclear industry. With the forecasted increase of radioactive material transport flows in future and the changing environment, AREVA Logistic Business Unit (L-BU) must ensure that safety and security risks are minimized but also ensure of the chain supply for its various facilities (mines, conversion, enrichment, fuel manufacturing, reprocessing, etc). AREVA L-BU Unit is implementing a transportation risk management initiative for the radioactive shipments of the AREVA group across all the Business Unit involved in shipments of radioactive and nuclear materials. The paper will present the four main components of the risk management. (authors)

  12. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  13. Management of metrology in measuring of the displacement of building construction

    Directory of Open Access Journals (Sweden)

    Jiří Kratochvíl

    2007-06-01

    Full Text Available The metrology management of the measurement of the displacement of building construction is not regulated in the standard ČSN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project. Then we have to pay an attention to the metrological management during this measurement (Stage of realization and during the evaluation of this measurement (Stage of evaluation. We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback. The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.

  14. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  15. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  16. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  17. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  18. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Science.gov (United States)

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  19. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  20. Investigation of Visual Management Cases in Construction by an Analytical Framework from Manufacturing

    OpenAIRE

    Murata, K.; Nakajima, K.; Kinoshita, K.; Tezel, Algan; Koskela, Lauri; Tzortzopoulos, Patricia; Katayama, H.

    2016-01-01

    Along with the progress of globalization, speed and efficiency have become more critical for any industry than ever before. In this sense, the concept and methods of lean management, promoting these performances, have been deployed from manufacturing, its origin industry, to other industries. This paper deals with this management style in the construction industry, called lean construction. In particular, visual management (VM) as one effective tool in this scheme is focused on. A number of V...

  1. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  2. Assessing buyer-supplier relationship management: a multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.; Buter, J.I.H.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  3. Assessing buyer-supplier relationship management : A multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  4. Forest carbon management in the United States: 1600-2100

    Science.gov (United States)

    Richard A. Birdsey; Kurt Pregitzer; Alan Lucier

    2006-01-01

    This paper reviews the effects of past forest management on carbon stocks in the United States, and the challenges for managing forest carbon resources in the 21st century. Forests in the United States were in approximate carbon balance with the atmosphere from 1600-1800. Utilization and land clearing caused a large pulse of forest carbon emissions during the 19th...

  5. Management information systems. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, D.; Spence, A.C.

    1985-02-01

    The successful application in the United Kingdom of the real time monitoring and control systems (MINOS) for underground mining operations, particularly in coal transport and the development of coalface monitoring (FIDO) in 1980 led naturally to the design of an operational data base for management. A User Group of experienced colliery managers produced a Management Information System (MIS) requirements specification and began the evolution of the systems of today. Twenty-four mines operate MIS in different ways from total dependency to a means of checking their manual reporting system. MIS collects useful data from all the major MINOS applications and provides a means of manually inputting other, relevant information. A wide variety of displays and reports are available to management, adjusted to meet individual requirements. The benefits from the use of MIS are difficult to quantify, since they become part of the management process. Further developments are taking place based on operational experience and requirements and taking advantage of the recent advances in computer technology. MIS is the modern management tool in British coal mining, collecting, storing, analysing and presenting accurate information upon which management decision making is based.

  6. Walking the tightrope: Constructing gender and professional identities in account management

    NARCIS (Netherlands)

    Gremmen, C.C.M.; Benschop, Y.W.M.

    2009-01-01

    This paper contributes to the growing stream of organization research that explores the relationship between professional identities and gender. Our central question pertains to how account managers ‘do gender’ in constructing their professional identities. While account management has been

  7. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Science.gov (United States)

    2010-10-01

    ... production inventory and include programmed extra units to cover replacement during the fabrication process... ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-3 Unit acquisition cost. (a... production costs (for assets produced or constructed). (5) Engineering, architectural, and other outside...

  8. Y-12 Construction/Demolition Landfill VII: Permit application: Part 1 and 2

    International Nuclear Information System (INIS)

    1992-04-01

    The United States Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) at Oak Ridge, Tennessee: the Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL). Operations associated with the DOE energy research and production facilities at Oak Ridge result in the production of several types of waste materials. Disposal of solid waste (as defined in the Solid Waste Processing and Disposal Rules for Tennessee) in disposal facilities operated by the Y-12 Plant is the responsibility of Y-12 Waste Management Division (MWD). The WMD is proposing to develop a facility that will include two new disposal units: one for construction/demolition waste and spoil and one for industrial solid waste. This manual describes the closure and post-closure plans for the construction/demolition waste and spoil disposal unit. This disposal unit is referred to as the Y-12 Construction/Demolition Landfill VII (CD-VII) and is to be operated by the Y-12 Plant for the DOE. This will be a Tennessee Department of Environment and Conservation/Division of Solid Waste Management (TDEC/DSWM) Class IV disposal unit

  9. Risk management solutions for Cernavoda Unit #2 NPP completion

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.

    2002-01-01

    The greatest risk facing today's electric utilities is change. Utility risk managers are being challenged to address the changes of deregulation, new technologies and changing work force. The utilities must be more aware of where all its costs are located to face with the challenge of competition, forcing them to respond with lower prices and innovative services. For completion of large projects, like Cernavoda NPP, Unit 2, the utilities are facing also with certain specific risks: politic, economic, social. The natural perils or machinery breakdown are common risks for operation as well as for construction-commissioning projects. Beyond the explicit challenges associated with the completion of a nuclear power plant in a transition economy environment, the utilities are facing with new risk factors such as professional liability, political risk, product warranty and liability, international exposure, etc. Changes in other governmental policies are also affecting large projects, mentioning healthcare, workplace safety, workers' compensation, environmental clean up, etc.(author)

  10. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  11. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  12. The management of animal bites in the United kingdom.

    Science.gov (United States)

    Evgeniou, E; Markeson, D; Iyer, S; Armstrong, A

    2013-01-01

    Animal bites represent a significant global health issue. The evidence in the literature regarding their management in many areas is conflicting and unclear. This project attempts to identify current evidence in the literature on the management of animal bites and assess if current practice in the United Kingdom is evidence based. A literature review on the management of animal bites was performed, and a national UK survey was contacted using a questionnaire based on the available evidence in the literature. The results from this survey show that 98% of plastic surgery units routinely use prophylactic antibiotics in all animal bite wounds; 58% close low-risk injuries primarily after initial washout, and there are conflicting opinions regarding the management of associated fractures and soft tissue injuries. The available data in the literature suggest that appropriate wound management is the most important factor for prevention of infection in animal bites. Antibiotic prophylaxis should only be given in high-risk wounds and primary closure should be performed in low-risk wounds. The management protocols of many plastic surgery units often diverge from the available evidence within the literature. On the basis of a thorough literature review, a guideline for the management of animal bites is presented. Future studies should investigate the management of associated fractures and soft tissue injuries.

  13. MANAGEMENT PROCESS OF HEALTH AND SAFETY RISK IN THE NIGERIA CONSTRUCTION INDUSTRY

    OpenAIRE

    Akwu, Ifeoma Claris

    2017-01-01

    The study examined the state of health and safety risk management practices in the building sector of the construction industry with the objective to examine the health and safety risk management processes adopted by the construction industry in Nigeria; the study adopted the survey and case study research design. It employed the use of Delphi’s technique in the distribution of questionnaire and made use of chi-square analytical technique for the analysis of gathered data. The findings reveal...

  14. IMPLEMENTATION OF THE CONCEPT OF AUTOMATION AND INTELLECTUALIZATION OF MANAGEMENT OF ROAD CONSTRUCTION PROCESSES

    Directory of Open Access Journals (Sweden)

    Ivanchura Vladimir Ivanovich

    2018-02-01

    Full Text Available Subject: management of operating modes of road-building machines, taking into account the implementation of the concept of information modeling of the road. We have reviewed the status and the development problems for directions of improving the control systems of road-construction machine processes. In this work we focus on the road construction stage “laying asphalt-concrete - compaction”, the effective control of which can lead to significant improvement in the quality of road surfaces, increase of durability and reduction of defects in pavements. Research objectives: rationale and directions of realization of the concept of intellectualization of the road construction management. Materials and methods: analysis of the shortcomings of construction of asphalt-concrete pavements, analysis of the methods of workflow management of road-building machines. Results: we have substantiated the methodological background for the development of intellectual control systems of road-building machines. Conclusions: we considered possible ways of introducing the concept of intellectualization of management systems for road-building machines.

  15. Strategies to address management challenges in larger intensive care units.

    Science.gov (United States)

    Matlakala, M C; Bezuidenhout, M C; Botha, A D H

    2015-10-01

    To illustrate the need for and suggest strategies that will enhance sustainable management of a large intensive care unit (ICU). The challenges faced by intensive care nursing in South Africa are well documented. However, there appear to be no strategies available to assist nurses to manage large ICUs or for ICU managers to deal with problems as they arise. Data sources to illustrate the need for strategies were challenges described by ICU managers in the management of large ICUs. A purposive sample of managers was included in individual interviews during compilation of evidence regarding the challenges experienced in the management of large ICUs. The challenges were presented at the Critical Care Society of Southern Africa Congress held on 28 August to 2 September 2012 in Sun City North-West province, South Africa. Five strategies are suggested for the challenges identified: divide the units into sections; develop a highly skilled and effective nursing workforce to ensure delivery of quality nursing care; create a culture to retain an effective ICU nursing team; manage assets; and determine the needs of ICU nurses. ICUs need measures to drive the desired strategies into actions to continuously improve the management of the unit. Future research should be aimed at investigating the effectiveness of the strategies identified. This research highlights issues relating to large ICUs and the strategies will assist ICU managers to deal with problems related to large unit sizes, shortage of trained ICU nurses, use of agency nurses, shortage of equipment and supplies and stressors in the ICU. The article will make a contribution to the body of nursing literature on management of ICUs. © 2014 John Wiley & Sons Ltd.

  16. Nurse management skills required at an emergency care unit

    OpenAIRE

    Montezeli, Juliana Helena; Peres, Aida Maris; Bernardino, Elizabeth

    2013-01-01

    Objective: To identify the management skills needed for this professional at an emergency care unit. Method: An exploratory descriptive qualitative study conducted with eight nurses in which semi-structured interviews with nonparticipating systematic observation were conducted; the data was processed by content analysis. Results: The categories which emerged from the content analysis served as a list of management skills necessary to their work at the emergency care unit: leadership, decision...

  17. Nurse manager perspective of staff participation in unit level shared governance.

    Science.gov (United States)

    Cox Sullivan, Sheila; Norris, Mitzi R; Brown, Lana M; Scott, Karen J

    2017-11-01

    To examine the nurse manager perspective surrounding implementation of unit level shared governance in one Veterans Health Administration facility. Nursing shared governance is a formal model allowing nursing staff decision-making input into clinical practice, quality improvement, evidence-based practice and staff professional development. Unit level shared governance is a management process where decision authority is delegated to nursing staff at the unit level. Convenience sampling was used to recruit ten nurse managers who participated in face-to-face semi-structured interviews. Data were analysed using content analysis and constant comparison techniques. Demographic data were described using descriptive statistics. The participants included seven female and three male nurse managers with seven Caucasian and three African American. Participant quotes were clustered to identify sub-themes that were then grouped into four global themes to describe unit level shared governance. The global themes were: (1) motivation, (2) demotivation, (3) recommendations for success, and (4) outcomes. These research findings resonate with previous studies that shared governance may be associated with increased nurse empowerment, self-management, engagement, and satisfaction. These findings reflect the need for nurse managers to promote and recognize staff participation in unit level shared governance. © 2017 John Wiley & Sons Ltd.

  18. Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework

    Science.gov (United States)

    Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.

    2016-08-01

    Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.

  19. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  20. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Science.gov (United States)

    2010-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  1. Failure stress as a motivator for creative construction management

    NARCIS (Netherlands)

    Gassel, van F.J.M.; Visser, M.J.E.; Bronswijk, van J.E.M.H.; Haidu, M.; Skibniewski, M.

    2013-01-01

    A building assignment is a complex task that demands collaborative working in order to achieve added value for users and society through creative construction management. Modular building systems are used in workshops in the building environment domain to make students aware of various phenomena

  2. A Spanish model for quantification and management of construction waste.

    Science.gov (United States)

    Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio

    2009-09-01

    Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.

  3. A Spanish model for quantification and management of construction waste

    International Nuclear Information System (INIS)

    Solis-Guzman, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramirez-de-Arellano, Antonio

    2009-01-01

    Currently, construction and demolition waste (C and D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C and D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C and D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C and D waste volume in both new construction and demolition projects.

  4. An initial investigation on the challenges of managing construction workforce in Saudi Arabia

    Science.gov (United States)

    Al-Emad, N.; Rahman, I. A.

    2017-11-01

    Most of the construction workers in Saudi Arabia are foreigners from several countries having different knowledge, skills and cultures. These create challenges to administer the workers in ensuring project success. This paper presents an initial investigation to uncover the challenges faced by construction professionals in managing construction workforce in Saudi Arabia. It describes insight processes of handling the workforce during planning stage, recruitment procedures and construction stage based on interview with senior manager who are well experienced in handling mega construction projects in Saudi Arabia. The interview was carried out in semi structured mode where the interviewee was given ample time to express the experiences encountered in dealing the workforce issue. This preliminary work able to identify among important issues related to construction workers are restrictions to non-Muslim skilled workers, limited visa quota, being away from family, delay in salary payment, cheating of workers skill’s status, safety issues, communication barriers and living conditions. Hence, these issues require quality leadership attributes such as continuous empathy with workers, respectful, trustful, sincere, reliable, good communication skills and problem solving skills. These findings are useful to construction practitioners and also research work related to construction leadership in handling worker’s issues.

  5. MANAGEMENT OF CONSTRUCTION TIME AT THE RESTORATION OF THE OSTANKINO TV TOWER

    Directory of Open Access Journals (Sweden)

    Михаил Николаевич ЕРШОВ

    2015-05-01

    Full Text Available The article presents options for managing construction time at restoration and renovation of the "Ostankino television tower", Moscow, also provides variants of method for optimization construction and installation works. Methodology is based on the construction of the project models in Microsoft Project and their experimental and statistical analysis using software COMPEX. This method is effective in the optimization reconstruction of complex engineering structures.

  6. United States Program on Spent Nuclear Fuel and High-Level Radioactive Waste Management

    International Nuclear Information System (INIS)

    Stewart, L.

    2004-01-01

    The President signed the Congressional Joint Resolution on July 23, 2002, that designated the Yucca Mountain site for a proposed geologic repository to dispose of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The United States (U.S.) Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is currently focusing its efforts on submitting a license application to the U.S. Nuclear Regulatory Commission (NRC) in December 2004 for construction of the proposed repository. The legislative framework underpinning the U.S. repository program is the basis for its continuity and success. The repository development program has significantly benefited from international collaborations with other nations in the Americas

  7. Identification of management units using population genetic data

    NARCIS (Netherlands)

    Palsboll, Per J.; Berube, Martine; Allendorf, Fred W.

    The identification of management units (MUs) is central to the management of natural populations and is crucial for monitoring the effects of human activity upon species abundance. Here, we propose that the identification of MUs from population genetic data should be based upon the amount of genetic

  8. Management of health in the construction and assembly of land pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Richa, Newton M.M.; Ruella, Nildemar C [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The objectives of this study are: describe the main aspects of a health management experience in a work of construction and assembly of land pipeline, highlighting the positive impacts on safety and productivity; demonstrate that the general objective of the health function is to provide technical support to companies, information and services for leaders, managers, supervisors, workers and families in the management of multiple interfaces of health, especially the health-work interface; and demonstrate that the appropriate management of health may contribute significantly to the overall management of undertakings. (author)

  9. Feasibility Study on UAV-assisted Construction Surplus Soil Tracking Control and Management Technique

    Science.gov (United States)

    Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen

    2018-01-01

    Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.

  10. Final Report: Self-Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Inc., Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Inc., Cranberry Township, PA (United States)

    2016-07-29

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to

  11. Final Report: Self-Consolidating Concrete Construction for Modular Units

    International Nuclear Information System (INIS)

    Gentry, Russell; Kahn, Lawrence; Kurtis, Kimberly; Petrovic, Bojan; Loreto, Giovanni; Van Wyk, Jurie; Canterero-Leal, Carlos

    2016-01-01

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed ''self-compacting concrete'' or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This ''self-roughening'' was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by

  12. 50 CFR 600.320 - National Standard 3-Management Units.

    Science.gov (United States)

    2010-10-01

    .... Wherever practicable, an FMP should seek to manage interrelated stocks of fish. (c) Unity of management... management exits or is planned for a separate geographic area or for a distinct use of the stocks, or if the... stock of fish shall be managed as a unit throughout its range, and interrelated stocks of fish shall be...

  13. Environmental management of construction and demolition waste in Kuwait.

    Science.gov (United States)

    Kartam, Nabil; Al-Mutairi, Nayef; Al-Ghusain, Ibrahim; Al-Humoud, Jasem

    2004-01-01

    There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.

  14. Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects

    NARCIS (Netherlands)

    Voordijk, Johannes T.; Adriaanse, Adriaan Maria

    2016-01-01

    The objective is to explore what engaged scholarship (ES) could mean for construction management research in facilitating interactions between practice and theory. ES aims to develop knowledge that advances both science and practice through engagement of scholars with practice. Three types of ES are

  15. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  16. INCREASED COMPETITIVENESS OF CONSTRUCTION ENTERPRISES ON THE BASIS OF ORGANISATIONAL-ECONOMIC DECISIONS OF PERSONNEL POTENTIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J. R. Emirbekova

    2017-01-01

    Full Text Available Objectives. The development of an algorithm for optimising the formation and use of human resources of a construction enterprise.Methods. The research basis consists in a generalised methodology  for personnel management, as well as specific methods for logical  and statistical analysis of management decision-making in  construction activities. The approaches, criteria, indicators and methods for assessing the effectiveness of human resource  management are studied alongside factors influencing the efficiency  resource potential management in a construction enterprise.Results. A quantitative methodology for the selection of qualified  staff for the implementation of construction projects is proposed.  The indicators of the effectiveness of the staff potential are  determined. Qualitative and quantitative data for the optimal  personnel formation for the construction project realisation are  systematised. An algorithm for optimising the personnel potential of  a construction enterprise is proposed. The use of this algorithm will  inform the choice of organisational and economic solutions for the  formation and effective use of qualified personnel at the expense of  combining professions, thereby reducing the cost and duration of construction work and increasing the resource efficiency and competitiveness of the construction enterprise.Conclusion. The labour potential of a construction enterprise can  significantly contribute to increased efficiency if it is used  appropriately and in an organised manner, using modern scientific  methods of management. Methods for building and organising the  activity of the personnel management system are proposed and a  mechanism for establishing relationships between the employer and employees that promote the most effective use of all types of resources for the development of the enterprise according to  strategic objectives is disclosed. The dominant role of the

  17. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  18. Network design and operational modelling for construction green supply chain management

    Directory of Open Access Journals (Sweden)

    Pengfei Zhou Dong Chen

    2013-01-01

    Full Text Available Based on studying organizational structure of Construction Green Supply Chain Management (CGSCM, a mathematical programming model of CGSCM was proposed. The model aimed to maximize the aggregate profits of normalized construction logistics, the reverse logistics and the environmental performance. Numerical experiments show that the proposed approach can improve the aggregate profit effectively. In addition, return ratio, subsidies from governmental organizations, and environmental performance were analyzed for CGSCM performance. Herein, the proper return, subsidy and control strategy could optimize construction green supply chain.

  19. A bi-level environmental impact assessment framework for comparing construction and demolition waste management strategies.

    Science.gov (United States)

    Yazdanbakhsh, Ardavan

    2018-04-27

    Several pioneering life cycle assessment (LCA) studies have been conducted in the past to assess the environmental impact of specific methods for managing mineral construction and demolition waste (MCDW), such as recycling the waste for use in concrete. Those studies focus on comparing the use of recycled MCDW and that of virgin components to produce materials or systems that serve specified functions. Often, the approaches adopted by the studies do not account for the potential environmental consequence of avoiding the existing or alternative waste management practices. The present work focuses on how product systems need to be defined in recycling LCA studies and what processes need to be within the system boundaries. A bi-level LCA framework is presented for modelling alternative waste management approaches in which the impacts are measured and compared at two scales of strategy and decision-making. Different functional units are defined for each level, all of which correspond to the same flow of MCDW in a cascade of product systems. For the sole purpose of demonstrating how the framework is implemented an illustrative example is presented, based on real data and a number of simplifying assumptions, which compares the impacts of a number of potential MCDW management strategies in New York City. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Using Lean principles to manage throughput on an inpatient rehabilitation unit.

    Science.gov (United States)

    Chiodo, Anthony; Wilke, Ruste; Bakshi, Rishi; Craig, Anita; Duwe, Doug; Hurvitz, Edward

    2012-11-01

    Performance improvement is a mainstay of operations management and maintenance of certification. In this study at a University Hospital inpatient rehabilitation unit, Lean management techniques were used to manage throughput of patients into and out of the inpatient rehabilitation unit. At the start of this process, the average admission time to the rehabilitation unit was 5:00 p.m., with a median time of 3:30 p.m., and no patients received therapy on the day of admission. Within 8 mos, the mean admission time was 1:22 p.m., 50% of the patients were on the rehabilitation unit by 1:00 p.m., and more than 70% of all patients received therapy on the day of admission. Negative variance from this performance was evaluated, the identification of inefficient discharges holding up admissions as a problem was identified, and a Lean workshop was initiated. Once this problem was tackled, the prime objective of 70% of patients receiving therapy on the date of admission was consistently met. Lean management tools are effective in improving throughput on an inpatient rehabilitation unit.

  1. [Medication error management climate and perception for system use according to construction of medication error prevention system].

    Science.gov (United States)

    Kim, Myoung Soo

    2012-08-01

    The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

  2. Social science constructs in ecosystem assessments: revisiting community capacity and community resiliency.

    Science.gov (United States)

    Ellen M. Donoghue; Victoria E. Sturtevant

    2007-01-01

    This article explores the development of sociological constructs in community assessment components of large-scale ecosystem assessments. We compare the conceptual and operational development of the constructs of community capacity and community resiliency used in three community assessments in the western United States: the Forest Ecosystem Management Assessment Team...

  3. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  4. United nations Supported principles for Responsible Management Education

    DEFF Research Database (Denmark)

    Godemann, Jasmin; Moon, Jeremy; Haertle, Jonas

    2014-01-01

    and various ecological system crises. The United Nations supported Principles for Responsible Management Education (PRME) initiative is an important catalyst for the transformation of management education and a global initiative to change and reform management education in order to meet the increasing......The expectation that management education institutions should be leading thought and action on issues related to corporate responsibility and sustainability has been reinforced in the light of their association with business leaders' failings, including corporate corruption, the financial crisis...

  5. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    Science.gov (United States)

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  6. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  7. The use of production management techniques in the construction of large scale physics detectors

    CERN Document Server

    Bazan, A; Estrella, F; Kovács, Z; Le Flour, T; Le Goff, J M; Lieunard, S; McClatchey, R; Murray, S; Varga, L Z; Vialle, J P; Zsenei, M

    1999-01-01

    The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so- called Workflow Management software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector ...

  8. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    OpenAIRE

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods: The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became ...

  9. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  10. Nurses' knowledge and barriers regarding pain management in intensive care units.

    Science.gov (United States)

    Wang, Hsiang-Ling; Tsai, Yun-Fang

    2010-11-01

    To explore nurses' knowledge and barriers regarding pain management in intensive care units. Pain is a common and treatable condition among intensive care patients. Quality care of these patients depends on the pain knowledge and pain management skills of critical care nurses. However, no single study has explored these nurses' knowledge of and perceived barriers to pain management in Taiwan. A cross-sectional study. Intensive care unit nurses (n = 370) were recruited from 16 hospitals chosen by stratified sampling across Taipei County in Taiwan. Data were collected on nurses' knowledge of pain management using the Nurses' Knowledge and Attitudes Survey-Taiwanese version, on perceived barriers to pain management using a researcher-developed scale and on background information. The overall average correct response rate for the knowledge scale was 53.4%, indicating poor knowledge of pain management. The top barrier to managing pain identified by these nurses was 'giving proper pain prescription needs doctor's approval; can't depend on me'. Knowledge of pain management was significantly and negatively related to perceived barriers to pain management. In addition, scores for knowledge and perceived barriers differed significantly by specific intensive care unit. Knowledge also differed significantly by nurses' education level, clinical competence level (nursing ladder) and hospital accreditation category. Our results indicate an urgent need to strengthen pain education by including case analysis for intensive care nurses in Taiwan. Pain education should target knowledge deficits and barriers to changing pain management approaches for Taiwanese nurses in intensive care units. © 2010 Blackwell Publishing Ltd.

  11. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  12. Managing risks during the construction of a power generation facility

    International Nuclear Information System (INIS)

    Loulakis, M.C.

    1992-01-01

    The construction of a power generation facility is a substantial undertaking that involves considerable risks to all parties involved. While contractors are accustomed to dealing with risks, construction owners are typically more naive about not only the risks they are assuming in the construction of a project, but also about the role they play on the project itself. Owners and developers of power facilities must understand at the outset that their role during the construction of a project is as integral to the success of the project as that of the designer and contractor. In addition, owners should also understand that there are virtually no risks on a construction project that cannot be shifted among the contracting parties as part of the business deal. Consequently, an owner may contractually be assuming the risks of (1) unusually severe weather, (2) unexpected subsurface conditions, (3) strikes at the turbine supplier's plant or (4) changes in law - as well as the increases in price and delays to project completion associated with such risks. In light of this, a prudent owner will evaluate more than just whether there is sufficient financing to complete the construction of a contemplated project. Prudent owners will conduct a risk management review of the project structure and the contracting terms, with the primary focus being (1) the identification and analysis of the most significant risks faced, (2) a determination of how such risks can be either mitigated or eliminated, and (3) the assessment of the financial exposure to the owner should the potential risk become a reality. This paper will present the framework that owners and developers of power generation projects can use in undertaking such a risk management review

  13. Managing Multiple Forms of Employment in the Construction Sector

    DEFF Research Database (Denmark)

    Raja, Jawwad; D. Green, Stuart; Leiringer, Roine

    2013-01-01

    different contracting arrangements impinge on attempts to reposition human resource management (HRM) as a strategic function along the business partnering model. Elevating the role of the HR function is found to be difficult to reconcile with the concurrent demands of managing multiple forms of employment......The construction industry is one of the largest and most complex industrial sectors in the UK. The industry's failure to adopt progressive human resource (HR) practices is routinely blamed on the challenges of operating in a fragmented, project-based environment reliant on subcontracting...

  14. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  16. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Pingish, Panupong; Choi, Kwang Sik

    2010-01-01

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  17. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  18. 78 FR 77334 - Small Business Size Standards: Construction

    Science.gov (United States)

    2013-12-23

    ... enrollment in the System of Award Management's (SAM) Dynamic Small Business Search database, and more firms... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AG37 Small Business Size Standards: Construction AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small...

  19. The Role of Problem Solving in Construction Management Practices

    DEFF Research Database (Denmark)

    Schultz, Casper Siebken

    2012-01-01

    industry. An Industrial PhD carried out at a large Danish contractor examined how failures and defects are produced and handled in the social practices of construction projects. The study addresses quality issues related to project management and examines the role of problem solving practices......Quality issues are a topic of continuous interest in the Danish construction industry. Not only can failures and defects be vital to the success of the single project but also the annual profits of the whole company can be put at risk. Moreover quality issues jeopardize the reputation of the entire......-dispositions regarding quality issues in the decision making and redressing of defects and failures in the processes. The role of problem solving and trouble-shooting is analysed through the well-organized processes of erecting the precast concrete structure and the chaotic processes of constructing the penthouse storey...

  20. Multi-Unit Aspects of the Pickering Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Morison, W. G. [Atomic Energy of Canada Ltd, Sheridan Park, ON (Canada)

    1968-04-15

    The Pickering nuclear generating station is located on the north shore of Lake Ontario, about 20 miles east of the city of Toronto, Canada. The station has been planned and laid out on an eight-unit station, four units of which have now been authorized for construction. Each of these four units consists of a single heavy-water moderated and cooled CANDU-type reactor and auxiliaries coupled to a single tandem compound turbine generator with a net output of approximately 500 MW(e). The units are identical and are scheduled to come into operation at intervals of one year from 1970 to 1973. The station has been planned with central facilities for: administration maintenance laboratories, stores, change rooms, decontamination and waste management services. A common control centre, cooling water intake and discharge system, and spent fuel storage bay for four units has been arranged. A feature of the multi-unit station is a common containment system. Cost savings in building a number of identical units on the same site result from a single exclusion area, shared engineering costs, equipment purchase contracts for four identical components, and efficient use of construction plant. Operating cost savings are anticipated in the use of a common operating and maintenance staff and spare parts inventory. The plant has been arranged to minimize problems of operating, commissioning and constructing units at the same time on the same site. The layout and construction sequence have been arranged so that the first unit can be commissioned and operated with little or no interference from the construction forces working on succeeding units. During the construction phase barriers will be erected in the common control centre between operating control equipment and that being installed. Operations and construction personnel will enter the plant by separate routes and work in areas separated by physical barriers. (author)

  1. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  2. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  3. Investigation and management of gastro-oesophageal reflux in United Kingdom neonatal intensive care units.

    Science.gov (United States)

    Rossor, Thomas; Andradi, Gwendolyn; Bhat, Ravindra; Greenough, Anne

    2018-01-01

    In 2004, wide variation in the investigation and management of gastro-oesophageal reflux (GOR) of infants on UK major neonatal units was demonstrated. Our aim was to resurvey neonatal practitioners to determine current practice and whether it was now evidence based. A questionnaire was sent to all 207 UK neonatal units. Responses were obtained from 84% of units. The most frequent 'investigation' was a trial of therapy (83% of units); pH studies were used in 38%, upper GI contrast studies in 19% and multichannel intraluminal impedance (MII)/pH studies in 5%. Only six units suggested a threshold for an abnormal pH study and two units for an abnormal MII study. Infants were commenced on antireflux medication without investigation always in 32% of units, often in 29%, occasionally in 19% and only never in 1%. Gaviscon was used as first line treatment in 60% of units, and other medications included ranitidine in 53%, thickening agents in 27%, proton pump inhibitors in 23%, domperidone in 22% and erythromycin in 6%. There remains a wide variation in diagnostic and treatment strategies for infants with suspected GOR on neonatal intensive care units, emphasising the need for randomised trials to determine appropriate GOR management. ©2017 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  4. Nursing professional practice environments: setting the stage for constructive conflict resolution and work effectiveness.

    Science.gov (United States)

    Siu, Heidi; Spence Laschinger, Heather K; Finegan, Joan

    2008-05-01

    The aim of this study was to examine the impact of nurses' perceived professional practice environment on their quality of nursing conflict management approaches and ultimately their perceptions of unit effectiveness from the perspective of Deutsch's theory of constructive conflict management. Rising reports of hostility and conflict among Canadian nurses are a concern to nurses' health and the viability of effective patient care delivery. However, research on the situational factors that influence nurses' ability to apply effective conflict resolution skills that lead to positive results in practice is limited. A nonexperimental, predictive design was used in a sample of 678 registered nurses working in community hospitals within a large metropolitan area in Ontario. The results supported a modified version of the hypothesized model [chi2(1) = 16.25, Goodness of Fit = 0.99, Comparative Fit Index = 0.98, Root-Mean-Square Error of Approximation = 0.15] linking professional practice environment and core self-evaluation to nurses' conflict management and, ultimately, unit effectiveness. Professional practice environment, conflict management, and core-self evaluation explained approximately 46.6% of the variance in unit effectiveness. Positive professional practice environments and high core self-evaluations predicted nurses' constructive conflict management and, in turn, greater unit effectiveness.

  5. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  6. Management and control aimed at reducing potential exposure of cobalt irradiation units

    International Nuclear Information System (INIS)

    Yan Yukui

    2003-01-01

    This paper is intended to address the problems of the management and control of potential exposure of cobalt irradiation units and analyze both the current situation and the resultant accident reasons associated with irradiation units, with the necessary control measures provided to reduce potential exposure. The concepts of defense in depth and excellent engineering practice are introduced in design to provide the units with sufficient redundancy. In the course of scientific management, the qualified applicants or registers devoted, strictly and effectively, their oversight, monitoring and regulation to the irradiation units. The effective management and control are achieved through safety analysis and assessment, reasonable regulatory system and source decommissioning system. (authors)

  7. Trend of the research on construction and demolition waste management

    International Nuclear Information System (INIS)

    Yuan Hongping; Shen Liyin

    2011-01-01

    Research interests in addressing construction and demolition (C and D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C and D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C and D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C and D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C and D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C and D waste management research, and this is considered a major methodology for future research in the discipline. C and D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C and D waste management has emerged as a new challenging topic.

  8. Trend of the research on construction and demolition waste management.

    Science.gov (United States)

    Yuan, Hongping; Shen, Liyin

    2011-04-01

    Research interests in addressing construction and demolition (C&D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C&D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C&D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C&D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C&D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C&D waste management research, and this is considered a major methodology for future research in the discipline. C&D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C&D waste management has emerged as a new challenging topic. Copyright © 2010 Elsevier Ltd. All rights reserved.

  9. Data exploration of social client relationship management (CRM 2.0) adoption in the Nigerian construction business.

    Science.gov (United States)

    Ojelabi, Rapheal A; Afolabi, Adedeji O; Oyeyipo, Opeyemi O; Tunji-Olayeni, Patience F; Adewale, Bukola A

    2018-06-01

    Integrating social client relationship management (CRM 2.0) in the built environment can enhance the relationship between construction organizations and client towards sustaining a long and lasting collaboration. The data exploration analyzed the e-readiness of contracting and consulting construction firms in the uptake of CRM 2.0 and the barriers encountered in the adoption of the modern business tool. The targeted organizations consist of seventy five (75) construction businesses operating in Lagos State which were selected from a pool of registered contracting and consulting construction firms using random sampling technique. Descriptive statistics of the e-readiness of contracting and consulting construction firms for CRM 2.0 adoption and barriers limiting its uptake were analyzed. Also, inferential analysis using Mann-Whitney U statistical and independent sample t-test was performed on the dataset obtained. The data generated will support construction firms on the necessity to engage in client social relationship management in ensuring sustainable client relationship management in the built environment.

  10. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  11. Design and construction of coal/biomass to liquids (CBTL) process development unit (PDU) at the University of Kentucky Center for Applied Energy Research (CAER)

    Energy Technology Data Exchange (ETDEWEB)

    Placido, Andrew [Univ. of Kentucky, Lexington, KY (United States); Liu, Kunlei [Univ. of Kentucky, Lexington, KY (United States); Challman, Don [Univ. of Kentucky, Lexington, KY (United States); Andrews, Rodney [Univ. of Kentucky, Lexington, KY (United States); Jacques, David [Univ. of Kentucky, Lexington, KY (United States)

    2015-10-30

    This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will produce research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in

  12. A historical context of municipal solid waste management in the United States.

    Science.gov (United States)

    Louis, Garrick E

    2004-08-01

    Municipal solid waste management (MSWM) in the United States is a system comprised of regulatory, administrative, market, technology, and social subcomponents, and can only be understood in the context of its historical evolution. American cities lacked organized public works for street cleaning, refuse collection, water treatment, and human waste removal until the early 1800s. Recurrent epidemics forced efforts to improve public health and the environment. The belief in anticontagionism led to the construction of water treatment and sewerage works during the nineteenth century, by sanitary engineers working for regional public health authorities. This infrastructure was capital intensive and required regional institutions to finance and administer it. By the time attention turned to solid waste management in the 1880s, funding was not available for a regional infrastructure. Thus, solid waste management was established as a local responsibility, centred on nearby municipal dumps. George Waring of New York City organized solid waste management around engineering unit operations; including street sweeping, refuse collection, transportation, resource recovery and disposal. This approach was adopted nationwide, and was managed by City Departments of Sanitation. Innovations such as the introduction of trucks, motorized street sweepers, incineration, and sanitary landfill were developed in the following decades. The Resource Conservation and Recovery Act of 1976 (RCRA), is the defining legislation for MSWM practice in America today. It forced the closure of open dumps nationwide, and required regional planning for MSWM. The closure of municipal dumps caused a 'garbage crisis' in the late 1980s and early 1990s. Private companies assumed an expanded role in MSWM through regional facilities that required the transportation of MSW across state lines. These transboundary movements of MSW created the issue of flow control, in which the US Supreme Court affirmed the protection

  13. An overview of the corrective action management unit and temporary unit regulations

    International Nuclear Information System (INIS)

    Green, D.R.; Corathers, L.; Coalgate, J.

    1995-01-01

    In February 1993, the US Environmental Protection Agency (EPA) promulgated the corrective action management unit (CAMU) and temporary unit (TU) regulations as 40 CFR Part 264, Subpart S. These regulations are intended to foster the selection of protective and cost-effective remedies for the restoration of sites contaminated by hazardous substances, hazardous wastes, and hazardous waste constituents by removing certain regulatory impediments to implementing those remedies, most notably those of the land disposal restrictions (LDRs). This paper provides a brief overview of the CAMU and TU regulations

  14. 76 FR 28954 - International Conservation and Management Measures Recognized by the United States

    Science.gov (United States)

    2011-05-19

    ... International Conservation and Management Measures Recognized by the United States AGENCY: National Marine... international conservation and management measures recognized by the United States. To fulfill this requirement, a list of agreements resulting in international conservation and management measures was first...

  15. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  16. The Crisis Management Practices of Australian Construction Companies

    Directory of Open Access Journals (Sweden)

    M Loosemore

    2012-11-01

    Full Text Available Recent world events in the international relations arena and the subsequent knock-on affect on the insurance industry, have sent shock-waves through Australia’s business community,elevating crisis management to the top of the managerial agenda. This paperpresents the findings of exploratory research, which investigated the crisis managementpractices of construction companies. Using a diagnostic model of crisis preparednesswhich has been developed and tested across a broad range of industries, it concludes thatif the sample surveyed is typical, then crisis planning is rudimentary and undertaken in aninsular, informal, fragmented fashion, supported by few resources and little strategicguidance. Consequently, many construction companies will have an inadequate understandingof their crisis exposure, of how to cope with crises when they happen and of howto learn and recover from their aftermath.

  17. Technology Trends and Opportunities for Construction Industry and Lifecycle Management

    OpenAIRE

    Janson, Vidar

    2017-01-01

    Master's thesis in for Offshore Technology: Industrial Asset Management The purpose of the report is to highlight methods that can make it easier for the construction industry and industry in general to benefit from new technology. The report is intended as a reference to technological solutions that along with some techniques, can streamline workflow for multiple tasks in planning, design, and operation and maintenance management. The problems focused on is how to: • Simplify the procu...

  18. Evolutionary algorithms and metaheuristics in civil engineering and Construction management

    CERN Document Server

    Greiner, David

    2015-01-01

    This book focuses on civil and structural engineering and construction management applications. The contributions constitute modified, extended and improved versions of research presented at the  minisymposium organized by the editors at the ECCOMAS conference on this topic in Barcelona 2014.

  19. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  20. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    Science.gov (United States)

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  1. Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'

    International Nuclear Information System (INIS)

    Emori, Kengo

    1979-01-01

    The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)

  2. Big Game Management Units, New Mexico Department of Game and Fish 2010

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — GMUs are based on New Mexico Department of Game and Fish Big Game Management Units and Game Management Sub-units as described in Title 19 Chapter 30 Part 4 ofThe New...

  3. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  4. Knowledge Management Practice in Two Australian Architecture-Engineering-Construction (AEC Companies

    Directory of Open Access Journals (Sweden)

    Patrick Zou

    2012-11-01

    Full Text Available Knowledge management (KM could be described as a management system that supports the creation, sharing and retrieving of valued information, expertise and insight within and across communities of people and related organizations using information and communication technologies and hence it is a combination of the effective application of information technlogy and management of human resources. KM is becoming a core competitive factor in construction operations. This paper presents the results of two case studies of KM practices in large AEC (architecture, engineering and construction companies through desk-top study and semi-structured interviews. The results indicate that implementing KM in AEC companies leads to competitive advantages and improved decision-making, problem solving and business performance. The results also indicateed that while technology plays an important role, top management commitment, total employee involvement, performance assessment and the culture of knowledge-learning and sharing must be considered when implementing KM. Therefore it is suggested that the implementation of KM should incorporate the company's vision, work processes, technology and culture, to improve the ability of knowledge creating, capturing, sharing, retrieving and ultimately, to improve the company's competitive advantage, decision making, problem solving and innovation.

  5. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  6. A constructivist approach for teaching research methodology in construction management

    NARCIS (Netherlands)

    Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig

    2010-01-01

    Construction Management (CM) is an acknowledged field of expertise and profession that requires students to research real world problems. To prepare the students for this task, many CM programs contain a Research Methodology (RM) course. However, after taking part in these courses, many students

  7. A Framework For A Decision Support Model For Supply Chain Management In The Construction Industry

    OpenAIRE

    Perdomo-Rivera, Jose Luis

    2004-01-01

    Materials are one of the areas that require special attention while creating a project's master plan as well as during the daily construction progress. The absence of materials when needed is one of the main causes of loss of productivity at a jobsite. Inefficient materials management can lead to an increase of 50% in work hours. As a result, a detailed plan for the materials management of each construction project is necessary. The critical role of materials management in the su...

  8. Constructing Proxy Variables to Measure Adult Learners' Time Management Strategies in LMS

    Science.gov (United States)

    Jo, Il-Hyun; Kim, Dongho; Yoon, Meehyun

    2015-01-01

    This study describes the process of constructing proxy variables from recorded log data within a Learning Management System (LMS), which represents adult learners' time management strategies in an online course. Based on previous research, three variables of total login time, login frequency, and regularity of login interval were selected as…

  9. Appropriate and sustainable wastewater management in developing countries by the use of constructed wetlands

    DEFF Research Database (Denmark)

    Brix, Hans; Koottatep, Thammarat; Fryd, Ole

    2010-01-01

    Constructed wetland systems for wastewater management may have great potential in developing countries as robust and decentralized solution. A case study from Koh Phi Phi island in Thailand where a constructed wetland systems was established after the destructions by the tsunami in 2004...... is described. The project includes a wastewater collection system for the main business area of the island, a pumping station, a multistage constructed wetland system, and a system for reuse of treated wastewater. The wastewater is treated to meet the Thai effluent standards for total suspended solids......, the system is only partly a success, mainly because no key-person or key-authority took responsibility for managing the system....

  10. An exploratory study of global leaders' and Chinese managers' leadership constructs in multinational corporations in China

    OpenAIRE

    Wang, Lake

    2012-01-01

    This research explores the leadership constructs of global leaders and Chinese managers in multi-national corporations (MNCs) in order to understand whether their constructs are misaligned, and if so, in what ways. To address these questions, data was gathered via repertory grid test interviews with 31 global leaders and 59 Chinese managers in six MNCs’ China organizations. Analysis subsequently revealed that global leaders rely upon twelve key constructs to define global leaders...

  11. Recruitment and Transition of Construction Lecturers in Further Education: The Perspective of Middle Managers

    Science.gov (United States)

    Page, Damien

    2013-01-01

    This article presents findings from a study of 14 heads of construction in further education colleges in England as they manage the transition of new construction lecturers from a culture of hypermasculinity to one of emotional labour and caring. It focuses firstly on the dilemmas faced by heads of construction at the recruitment stage before…

  12. Final Report: Self Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Electric Company, Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Electric Company, Cranberry Township, PA (United States)

    2016-07-29

    This report outlines the development of a self-consolidating concrete (also termed “self-compacting concrete” or SCC) so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The self-roughening concrete produced as part of this research was assessed in SC structures at three scales: small-scale shear-friction specimens, mid-scale beams tested in in-plane and out-of-plane bending, and a full-scale validation test using an SC module produced by Westinghouse as part of the Plant Vogtle expansion. The experiments show that the self-roughening concrete can produce a cold-joint surface of 0.25 inches (6 mm) without external vibration during concrete placement. The experiments and subsequent analysis show that the shear friction provisions of ACI 318-14, Section 22.9 can be used to assess the shear capacity of the cold-joints in SC modular construction, and that friction coefficient of 1.35 is appropriate for use with these provisions.

  13. 76 FR 8782 - Underground Construction Standard; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2011-02-15

    ...] Underground Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... Underground Construction (29 CFR 1926.800). DATES: Comments must be submitted (postmarked, sent, or received...). Seven paragraphs in the Underground Construction Standard (``the Standard''), 29 CFR 1926.800, require...

  14. Processes in construction of failure management expert systems from device design information

    Science.gov (United States)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  15. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  16. Determinants of Management Innovation in the Ghanaian Construction Consulting Sector

    Directory of Open Access Journals (Sweden)

    De-Graft Owusu-Manu

    2015-03-01

    Full Text Available Determinants of management innovation (MI within the Ghanaian construction consulting sector are examined. A sample of 70 consulting firms is surveyed using self-administered questionnaires. Data are analysed using descriptive statistics and factor analysis. Findings indicate that determinants of MI were interwoven among seven principal factors viz: community and market demands; financial and business management practices; human resource policies; creativity and organizational strategies; corporate social responsibility; prevailing conditions; and competitive leverage. The study adds to the discourse on evolution of innovation within the global consulting sector generally, while providing reference for practitioners and academics in the field with respect to MI determinants more specifically. It is envisaged that practitioners who adopt these findings in the construction consultancy sector would enhance their ability to provide innovative services to clients. Study recommendations include that future research should explore how innovation is diffused within consulting enterprises’ value chains. Paper Type: Research article

  17. Research and practice of informatization construction in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Guo Weiqun; Yu Ren; Xiang Xinmin

    2013-01-01

    The goal, content and requirement of the informatization construction in waste treatment and management in nuclear power system are discussed in the paper, as well as some key problems in this process. Taking the engineering practice of informatization construction in a waste treatment center as an example, the composition and architecture of the information system, the consideration and the solution methods of some key problems in system design and development are introduced in the paper. (authors)

  18. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Rockson Dobgegah

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  19. Practitioner Perceptions of Adaptive Management Implementation in the United States

    Directory of Open Access Journals (Sweden)

    Melinda Harm. Benson

    2013-09-01

    Full Text Available Adaptive management is a growing trend within environment and natural resource management efforts in the United States. While many proponents of adaptive management emphasize the need for collaborative, iterative governance processes to facilitate adaptive management, legal scholars note that current legal requirements and processes in the United States often make it difficult to provide the necessary institutional support and flexibility for successful adaptive management implementation. Our research explores this potential disconnect between adaptive management theory and practice by interviewing practitioners in the field. We conducted a survey of individuals associated with the Collaborative Adaptive Management Network (CAMNet, a nongovernmental organization that promotes adaptive management and facilitates in its implementation. The survey was sent via email to the 144 participants who attended CAMNet Rendezvous during 2007-2011 and yielded 48 responses. We found that practitioners do feel hampered by legal and institutional constraints: > 70% of respondents not only believed that constraints exist, they could specifically name one or more examples of a legal constraint on their work implementing adaptive management. At the same time, we found that practitioners are generally optimistic about the potential for institutional reform.

  20. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    Science.gov (United States)

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  1. Assessment Attributes on Effective Construction Management for Property Developers in Malaysia

    Directory of Open Access Journals (Sweden)

    Ayob Norizam

    2014-06-01

    attributes. Comparison was made with attributes from Project Management Book of Knowledge in order to explore the underlying suitability of the proposed attributes with the study area in terms of climate, economy, etc. Factor Analysis was adopted to investigate the group component relationships. This study focuses on the link between CSFs and the implementation of an effective construction management specifically for property developers in Malaysia.

  2. Application of 3D model in the schedule management of nuclear power plant construction

    International Nuclear Information System (INIS)

    Nian Fayang

    2009-01-01

    While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)

  3. Problems of improving the investing process management in NPP construction

    International Nuclear Information System (INIS)

    Denisov, G.A.

    1986-01-01

    Problems of development of the optimal system for the investing process management in NPP construction are discussed. It includes 3 steps: design construction ( including building structure and equipment production ), and achievement of designed technical and economical indices, during reactor start-up. The method for estimating the interest of each participator of the intensing process and developing the optimal solution, that is capable to approach these interests, is suggested. The conclusion is made that it is necessary to develop and confirm the branch standard, which should include a complex amalgamated network of works to improve the organization of the investing process

  4. Predictable grammatical constructions

    DEFF Research Database (Denmark)

    Lucas, Sandra

    2015-01-01

    My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting that these p......My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting...... that these predictable units should be considered grammatical constructions on a par with the nonpredictable constructions. Frequency has usually been seen as the only possible argument speaking in favor of viewing some formally and semantically fully predictable units as grammatical constructions. However, this paper...... semantically and formally predictable. Despite this difference, [méllo INF], like the other future periphrases, seems to be highly entrenched in the cognition (and grammar) of Early Medieval Greek language users, and consequently a grammatical construction. The syntactic evidence speaking in favor of [méllo...

  5. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  6. A model for evaluating the social performance of construction waste management

    International Nuclear Information System (INIS)

    Yuan Hongping

    2012-01-01

    Highlights: ► Scant attention is paid to social performance of construction waste management (CWM). ► We develop a model for assessing the social performance of CWM. ► With the model, the social performance of CWM can be quantitatively simulated. - Abstract: It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.

  7. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  8. Construction safety: Can management prevent all accidents or are workers responsible for their own actions?

    International Nuclear Information System (INIS)

    Cotten, G.B.; Jenkins, S.L.

    1997-01-01

    The construction industry has struggled for many years with the answer to the question posed in the title: Can Management Prevent All Accidents or Are Workers Responsible for Their Own Actions? In the litigious society that we live, it has become more important to find someone open-quotes at faultclose quotes for an accident than it is to find out how we can prevent it from ever happening again. Most successful companies subscribe to the theme that open-quotes all accidents can be prevented.close quotes They institute training and qualification programs, safe performance incentives, and culture-change-driven directorates such as the Voluntary Protection Program (VPP); yet we still see construction accidents that result in lost time, and occasionally death, which is extremely costly in the shortsighted measure of money and, in real terms, impact to the worker''s family. Workers need to be properly trained in safety and health protection before they are assigned to a job that may expose them to safety and health hazards. A management committed to improving worker safety and health will bring about significant results in terms of financial savings, improved employee morale, enhanced communities, and increased production. But how can this happen, you say? Reduction in injury and lost workdays are the rewards. A decline in reduction of injuries and lost workdays results in lower workers'' compensation premiums and insurance rates. In 1991, United States workplace injuries and illnesses cost public and private sector employers an estimated $62 billion in workers'' compensation expenditures

  9. COMPARISON OF TRENDS IN RISK MANAGEMENT THEORY AND PRACTICES WITHIN THE CONSTRUCTION INDUSTRY

    OpenAIRE

    Dena Crnković; Mladen Vukomanović

    2016-01-01

    This study considered the problem of understanding and use of risk management methods in construction projects and their representation in the literature and their practical application. Research of trends in risk management was conducted using studies from the EBSCO database that were published in the period from 1999 to 2015. The focus included the development of two terms, namely traditional and holistic approach to risk management as well as to uncertainty and opportunity management. The ...

  10. Delineating Supply Chain Management (SCM Features in Construction Project Delivery: The Nigerian Case

    Directory of Open Access Journals (Sweden)

    Benedict Amade

    2017-04-01

    Full Text Available This study sought to delineate SCM features using the analytical hierarchy process (AHP with a view to incorporating it into the delivery of construction projects in Nigeria. The study adopted an exploratory research design (quantitative and qualitative methods. A purposive and convenient sampling technique was deployed with the aid of semi-structured interview, case study; questionnaire survey in a construction firm in Port-Harcourt, Rivers State, Nigeria. Questionnaires were used to collect primary data after being pre-tested via a pilot study for validity and reliability. The data collected were analysed using the AHP. Findings from the study shows that the following features are key; Instituting trust and long term relationships amongst supply chain partners (ITP, supply chain finance (SCF, supply chain and continuous performance measurement (SCCPM, information technology (IT, quality management (QM, supply base management (SBM, senior management’s commitment (SMC and supply chain orientation (SCO. In delivering construction projects to success using the SCM approach, adequate attention and emphasis should be accorded to the aforementioned important features in the order they appear as they would aid in effecting the much needed success. It is also expected that the features would further be beneficial to construction firms as it would enable the firms to manage, measure and evaluate the gains ensuing from the deployment of SCM techniques.

  11. Human resource management and unit performance in knowledge-intensive work.

    Science.gov (United States)

    Kehoe, Rebecca R; Collins, Christopher J

    2017-08-01

    To clarify the potential value of a targeted system of human resource (HR) practices, we explore the unique effects of a relationship-oriented HR system and the more commonly studied high commitment HR system on unit performance in the context of knowledge-intensive work. We develop theoretical arguments suggesting that the high commitment HR system contributes to unit performance through its positive effects on employees' collective organizational commitment, general and firm-specific human capital, and access to knowledge. We argue that the relationship-oriented HR system contributes to unit performance through its positive effects on employees' collective access to knowledge by fostering a social context and interpersonal exchange conditions which support employees' ongoing access to knowledge flows within and outside their unit and broader organization. Based on unit-level data collected from a matched sample of employees and managers in 128 units in the science and engineering division of a large hydroelectric power organization, our results suggest that the targeted, relationship-oriented HR system is related to firm performance and may complement a broader, high commitment approach to managing knowledge workers. Specifically, the positive relationship between the high commitment HR system and unit performance is mediated by employees' collective organizational commitment, firm-specific human capital, and access to knowledge in other organizational units; whereas the positive relationship between the relationship-oriented HR system and unit performance is mediated by units' access to knowledge within the unit, in other units, and outside the organization. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  12. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    Science.gov (United States)

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  13. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    Science.gov (United States)

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  14. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  15. HYDRAULIC UNITS FOR DRIVING SYSTEMS OF RUNNING EQUIPMENT IN ROAD CONSTRUCTION MACHINERY

    Directory of Open Access Journals (Sweden)

    A. Ja. Kotlobai

    2016-01-01

    Full Text Available Operational efficiency of multi-functional road construction machines depends on number of working bodies which are simultaneously performing technological operations. Systems for propulsion pto to the running equipment drive and active working bodies of road construction machines are developing in the way of using three-axis hydraulic drives. When designing a hydraulic system for road construction machinery dividing of power flow from propulsion to the running equipment drive and active working bodies is considered as rather essential problem. Leading companies do not pay attention to the development of flow divider designs, preferring to produce more expensive multi-flow pumps. One of the ways to increase efficiency of multi-functional road construction machinery is an implementation of running equipment hydraulic driving system based on a mono-aggregate pump unit which consists of a pump and a volumetric divider of power fluid flow. A principle of volumetric division and summing-up of power fluid flows, technical realization and methodology for calculation of key parameters of discrete flow distributors has been developed on the basis of discrete hydraulics regulations. The paper presents results of mathematical modeling of hydraulic systems equipped with the discrete flow distributor. Analysis of a dual-motor hydraulic drive operation has shown the following results: a discrete flow distributor ensures independent load mode of the current consumer circuit operation from the load mode of the second consumer circuit within a wide range of loads; rational value of working fluid flow discretization parameter is the following value interval k = 4–6, maximum value of parameter efficiency is reached when an angular velocity of a distributor rotor coincides with the angular velocity of a pump shaft; discrete flow distributor provides a possibility to change parameters of hydraulic flow feeding in consumers’ pressure lines within a wide range

  16. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  17. BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.

  18. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011

    Science.gov (United States)

    Craig Adair; David B. McKeever; Chris Gaston; Margaret. Stewart

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  19. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  20. Giving patients responsibility or fostering mutual response-ability: family physicians' constructions of effective chronic illness management.

    Science.gov (United States)

    Thille, Patricia H; Russell, Grant M

    2010-10-01

    Current visions of family medicine and models of chronic illness management integrate evidence-based medicine with collaborative, patient-centered care, despite critiques that these constructs conflict with each other. With this potential conflict in mind, we applied a critical discursive psychology methodology to present discursive patterns articulated by 13 family physicians in Ontario, Canada, regarding care of patients living with multiple chronic illnesses. Physicians constructed competing versions of the terms "effective chronic illness management" and "patient involvement." One construction integrated individual responsibility for health with primacy of "evidence," resulting in a conceptualization consistent with paternalistic care. The second constructed effective care as involving active partnership of physician and patient, implying a need to foster the ability of both practitioners and patients to respond to complex challenges as they arose. The former pattern is inconsistent with visions of family medicine and chronic illness management, whereas the latter embodies it.

  1. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  2. 77 FR 47883 - The Lead in Construction Standard; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2012-08-10

    ... Lead in Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... proposal to extend the Office of Management and Budget's (OMB) approval of the information collection requirements specified in the Lead in Construction Standard (29 CFR 1926.62). DATES: Comments must be submitted...

  3. Examining the relationships between span of control and manager job and unit performance outcomes.

    Science.gov (United States)

    Wong, Carol A; Elliott-Miller, Pat; Laschinger, Heather; Cuddihy, Michael; Meyer, Raquel M; Keatings, Margaret; Burnett, Camille; Szudy, Natalie

    2015-03-01

    Our aim was to examine the combination of frontline manager (FLM) personal characteristics and span of control (SOC) on their job and unit performance outcomes. Healthcare downsizing and reform have contributed to larger spans for FLMs in Canadian hospitals and increased concerns about manager workload. Despite a heightened awareness of SOC issues among decision makers, there is limited empirical evidence related to the effects of SOC on outcomes. A non-experimental predictive survey design was used to examine FLM SOC in 14 Canadian academic hospitals. Managers (n = 121) completed an online survey of work characteristics and The Ottawa Hospital (TOH) SOC tool. Unit turnover data were collected from organisational databases. The combination of SOC and core self-evaluation significantly predicted role overload, work control and job satisfaction, but only SOC predicted unit adverse outcomes and neither significantly predicted unit turnover. The findings contribute to an understanding of connections between the combination of SOC and core self-evaluation and manager job and unit performance outcomes. Organisational strategies to create manageable FLM SOC are essential to ensure exemplary job and unit outcomes. Core self-evaluation is a personality characteristic that may enhance manager performance in the face of high spans of control. © 2013 John Wiley & Sons Ltd.

  4. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  5. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  6. [Continuing training plan in a clinical management unit].

    Science.gov (United States)

    Gamboa Antiñolo, Fernando Miguel; Bayol Serradilla, Elia; Gómez Camacho, Eduardo

    2011-01-01

    Continuing Care Unit (UCA) focused the attention of frail patients, polypathological patients and palliative care. UCA attend patients at home, consulting, day unit, telephone consulting and in two hospitals of the health area. From 2002 UCA began as a management unit, training has been a priority for development. Key elements include: providing education to the workplace, including key aspects of the most prevalent health care problems in daily work, directing training to all staff including organizational aspects of patient safety and the environment, improved working environment, development of new skills and knowledge supported by the evidence-based care for the development of different skills. The unit can be the ideal setting to undertake the reforms necessary conceptual training of professionals to improve the quality of care. 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  7. Effect of CRAC units layout on thermal management of data center

    International Nuclear Information System (INIS)

    Nada, S.A.; Said, M.A.

    2017-01-01

    Highlights: • CFD study of thermal management in data centers. • Effects of layout arrangements of the CRACs units relative to the racks array on data center performance. • Design guide liens for data centers energy efficiency improvements. - Abstract: Comprehensive numerical studies of thermal management of data centers were presented by several investigators for different geometric and operating conditions of data centers. In the present work, a technical note regarding the effect of the computer room air conditioning (CRAC) units layout arrangements is presented. Two arrangements of CRAC units layouts are investigated; namely locating CRACs units in line with the racks row and locating the CRACs units perpendicular to the rack row. Temperature distributions, air flow characteristics particularly air recirculation and bypass and thermal management in data centers are evaluated in terms of the measureable overall performance parameters: supply/return heat indices (SHI/RHI) and return temperature indices (RTI). The results showed that locating CRAC units perpendicular to the racks row has the following effects: (i) enhances the uniformity of the air flow from the perforated tiles along the rack row, (ii) reduces the hot air recirculation at the ends racks of the row and the cold air bypass at the middle rack of the row and (iii) enhances the data center performance parameters RTI, SHI and RHI.

  8. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  9. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  10. Analysis and management of risks experienced in tunnel construction

    Directory of Open Access Journals (Sweden)

    Cagatay Pamukcu

    2015-12-01

    Full Text Available In this study, first of all, the definitions of "risk", "risk analysis", "risk assessment" and "risk management" were made to avoid any confusions about these terms and significance of risk analysis and management in engineering projects was emphasized. Then, both qualitative and quantitative risk analysis techniques were mentioned and within the scope of the study, Event Tree Analysis method was selected in order to analyze the risks regarding TBM (Tunnel Boring Machine operations in tunnel construction. After all hazards that would be encountered during tunnel construction by TBM method had been investigated, those hazards were undergoing a Preliminary Hazard Analysis to sort out and prioritize the risks with high scores. When the risk scores were taken into consideration, it was seen that the hazards with high risk scores could be classified into 4 groups which are excavation + support induced accidents, accidents stemming from geologic conditions, auxiliary works, and project contract. According to these four classified groups of initiating events, Event Tree Analysis was conducted by taking into care 4 countermeasures apart from each other. Finally, the quantitative and qualitative consequences of Event Tree Analyses, which were undertaken for all initiating events, were investigated and interpreted together by making comparisons and referring to previous studies.

  11. Construction management and economics: the epistemology of a multidisciplinary design science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2009-01-01

    Research in the field of construction management and economics (CME) can be characterized as a multidisciplinary design science. Results from the sciences and humanities are necessary inputs for this field of research that deals with design, production and operation of the built environment. The

  12. A role-play approach for teaching research methodology in construction management

    NARCIS (Netherlands)

    Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig; Dainty, A

    2008-01-01

    Assignments of Construction Management (CM) graduate programmes often require students to carry out research on real-world problems. To prepare students for this task, many CM-programmes contain a research methodology course. However, after taking part in these courses, many students still lack the

  13. 76 FR 70166 - Electrical Standards for Construction and General Industry; Extension of the Office of Management...

    Science.gov (United States)

    2011-11-10

    ...] Electrical Standards for Construction and General Industry; Extension of the Office of Management and Budget... contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K) and for General... maintenance of electric utilization equipment that prevent death and serious injuries among construction and...

  14. Development of a validation process for parameters utilized in optimizing construction quality management of pavements.

    Science.gov (United States)

    2006-01-01

    The implementation of an effective performance-based construction quality management requires a tool for determining impacts of construction quality on the life-cycle performance of pavements. This report presents an update on the efforts in the deve...

  15. Occupational health management system: A study of expatriate construction professionals.

    Science.gov (United States)

    Chan, I Y S; Leung, M Y; Liu, A M M

    2016-08-01

    Due to its direct impact on the safety and function of organizations, occupational health has been a concern of the construction industry for many years. The inherent complexity of occupational health management presents challenges that make a systems approach essential. From a systems perspective, health is conceptualized as an emergent property of a system in which processes operating at the individual and organizational level are inextricably connected. Based on the fundamental behavior-to-performance-to-outcome (B-P-O) theory of industrial/organizational psychology, this study presents the development of an I-CB-HP-O (Input-Coping Behaviors-Health Performance-Outcomes) health management systems model spanning individual and organizational boundaries. The model is based on a survey of Hong Kong expatriate construction professionals working in Mainland China. Such professionals tend to be under considerable stress due not only to an adverse work environment with dynamic tasks, but also the need to confront the cross-cultural issues arising from expatriation. A questionnaire was designed based on 6 focus groups involving 44 participants, and followed by a pilot study. Of the 500 questionnaires distributed in the main study, 137 valid returns were received, giving a response rate of 27.4%. The data were analyzed using statistical techniques such as factor analysis, reliability testing, Pearson correlation analysis, multiple regression modeling, and structural equation modeling. Theories of coping behaviors and health performance tend to focus on the isolated causal effects of single factors and/or posits the model at single, individual level; while industrial practices on health management tend to focus on organizational policy and training. By developing the I-CB-HP-O health management system, incorporating individual, interpersonal, and organizational perspectives, this study bridges the gap between theory and practice while providing empirical support for a

  16. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  17. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  18. Resource management for sustainable development : The application of a methodology to support resource management for the adequate application of Construction Systems to enhance sustainability in the lower income dwelling construction industry in Costa Rica

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Erkelens, P.A.; Jonge, de S.; Vliet, van A.A.M.

    2000-01-01

    This paper describes the results of the application of a methodology to support resource management for the enhancement of sustainability in the construction industry. Particular emphasis is given to the sustainability of manufacturing and application of construction systems for low income housing

  19. Wood Products Other Building Materials Used in New Residential Construction in the United States

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2015-01-01

    On average, new residential construction accounts for about one-third of all wood products consumed in the United States annually. During periods of robust housing activity, 45% or more of all wood products consumed are for new single-family and multifamily housing. This can fall to as low as 20% or less during times of economic recession. Unfortunately, 2012 was not...

  20. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  1. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  2. How the United States exports managed care to developing countries.

    Science.gov (United States)

    Waitzkin, H; Iriart, C

    2001-01-01

    As their expansion slows in the United States, managed care organizations will continue to enter new markets abroad. Investors view the opening of managed care in Latin America as a lucrative business opportunity. As public-sector services and social security funds are cut back, privatized, and reorganized under managed care, with the support of international lending agencies such as the World Bank, the effects of these reforms on access to preventive and curative services will hold great importance throughout the developing world. Many groups in Latin America are working on alternative projects that defend health as a public good, and similar movements have begun in Africa and Asia. Increasingly, this organizing is being recognized not only as part of a class struggle but also as part of a struggle against economic imperialism--which has now taken on the new appearance of rescuing less developed countries from rising health care costs and inefficient bureaucracies through the imposition of neoliberal managed-care solutions exported from the United States.

  3. Use of the "dual construct" for the management of complex spinal reconstructions.

    Science.gov (United States)

    Shen, Francis H; Qureshi, Rabia; Tyger, Rose; Lehman, Rebecca; Singla, Anuj; Shimer, Adam; Hassanzadeh, Hamid

    2018-03-01

    Surgical management of complex spinal reconstructions remains a clinical challenge, as pseudoarthrosis with subsequent rod breakage can occur. Increased rod density in the form of "satellite" or "outrigger" rods have been described; however, rod-fracture above or below satellite rods persist and can result in dissociation of the construct, loss of correction, and recurrence of deformity. The use of four distinct and mechanically independent rods (dual construct) reduces this concern. Since the original case description in 2006, there have been no other studies that use the dual construct for the surgical management of complex spinal reconstructions. The purpose of this study is to review the long-term experience and surgical technique using the dual construct, and to present our complications, rod fracture rates, and outcomes for the surgical management of complex spinal reconstructions. This study used a surgical technique with case series outcomes. Patients were from a single-institute who underwent dual construct between 2010 and 2014 and who were available for 2-year follow-up. Radiographic and functional outcomes, complications, rod fracture rates, and revision surgery rates were the outcome measures. A retrospective review was conducted from a single institution between 2010 and 2014, with a subsequent 2-year follow-up period. Extensive review of patients' medical record, radiographs, and advanced imaging where available was performed. Medical record was evaluated for patient demographics, surgical procedure, and complications. Radiographic measurements included presence or absence of implant failure and proximal junctional kyphosis or distal junctional kyphosis. A total of 36 patients underwent surgical reconstruction. The average estimated blood loss was 1,856 cc (range, 400-4,000 cc). The average length of stay was 7.3 days (range, 4-22 days). Clinical follow-up reported 21 patients (58.3%) with no or minimal pain. There were six deaths during the

  4. Review of Solid Waste Management Practice, Handling and Planning in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Fiza Mohd Noh

    2017-11-01

    Full Text Available The building and construction industry is a major contributor to the source of national economy. However, inappropriate construction waste management lead to various problems such as illegal dumping along the roadsides, demolition waste and disposal of construction at landfills that Malaysia is facing serious shortage of landfill space and recently the issue has become more serious throughout the country, which these have caused major government sources and environmental issue. Solid waste management is one of the environmental issues which always been a concerned to most governments. In urban areas, 46% of the population in the statistics that shows the world population has reached six billion. In 1997, generation of the municipal solid waste was about 0.49 billion tons around the globe with an estimated annual growth rate of 3.2-4.5% in develop nations and 2-3% in developing countries. The characteristics of solid waste generated were changed due to the rapid urbanization and industrialization.

  5. Nursing management and organizational ethics in the intensive care unit.

    Science.gov (United States)

    Wlody, Ginger Schafer

    2007-02-01

    This article describes organizational ethics issues involved in nursing management of an intensive care unit. The intensive care team and medical center management have the dual responsibility to create an ethical environment in which to provide optimum patient care. Addressing organizational ethics is key to creating that ethical environment in the intensive care unit. During the past 15-20 yrs, increasing costs in health care, competitive markets, the effect of high technology, and global business changes have set the stage for business and healthcare organizational conflicts that affect the ethical environment. Studies show that critical care nurses experience moral distress and are affected by the ethical climate of both the intensive care unit and the larger organization. Thus, nursing moral distress may result in problems related to recruitment and retention of staff. Other issues with organizational ethics ramifications that may occur in the intensive care unit include patient safety issues (including those related to disruptive behavior), intensive care unit leadership style, research ethics, allocation of resources, triage, and other economic issues. Current organizational ethics conflicts are discussed, a professional practice model is described, and multidisciplinary recommendations are put forth.

  6. A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

    Directory of Open Access Journals (Sweden)

    Ali Asghar Najafpoor

    2014-09-01

    Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

  7. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  8. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  9. Use of communication technologies in document exchange for the management of construction projects

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2016-06-01

    Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  10. Use of communication technologies in document exchange for the management of construction projects

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2016-06-01

    Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  11. Practice of knowledge management for institutes--take the construction of experience feedback system as the example

    International Nuclear Information System (INIS)

    Wu Kaiping

    2014-01-01

    The construction of experience feedback system is an important part and breakthrough point of institutes' knowledge management. It is significant for institutes' design, management, development and innovation. This article introduces the concept of experience feedback for institutes. It also goes details of the content of experience feedback system construction for institutes, including the founding of experience feedback organizational mechanism, the development of experience feedback system, construction of knowledge database system, the construction of knowledge resources, and the appraisal of experience feedback's performance. Furthermore, the recognition and support of leaders, understanding and cooperation of relative departments, and corporation's culture of encouraging knowledge sharing, also are the important guarantees for the good effects of institutes' experience feedback work. (author)

  12. 75 FR 60480 - Concrete and Masonry Construction; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2010-09-30

    ...] Concrete and Masonry Construction; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Concrete and Masonry Construction (29 CFR part 1926, subpart Q..., screens or pumps used for concrete and masonry construction) specified by paragraphs 1926.702(a)(2), (j)(1...

  13. Defining management units for cetaceans by combining genetics, morphlogy, acoustics and satellite tracking

    DEFF Research Database (Denmark)

    Sveegaard, Signe; Galatius, Anders; Dietz, Rune

    2015-01-01

    Managing animal units is essential in biological conservation and requires spatial and temporal identification of such units. Since even neighbouring populations often have different conservation status and face different levels of anthropogenic pressure, detailed knowledge of population structure......, seasonal range and overlap with animals from neighbouring populations is required to manage each unit separately. Previous studies on genetic structure and morphologic separation suggests three distinct populations of harbour porpoises with limited geographic overlap in the North Sea (NS), the Belt Sea (BS...... with the least overlap between populations and thus the least error when abundance and population status is estimated. Discriminant analysis of the satellite tracking data from the BS and NS populations showed that the best fit of the management unit border during the summer months was an east-west line from...

  14. Construction Waste Management Profiles, Practices, and Performance: A Cross-Jurisdictional Analysis in Four Countries

    Directory of Open Access Journals (Sweden)

    Vivian Wing-Yan Tam

    2016-02-01

    Full Text Available Construction waste management (CWM has received worldwide attention for some time. As a result, a plethora of research, investigating a wide array of CWM issues such as their profiles, practices, and performance, has been reported in individual economies around the globe. However, a cross-jurisdictional comparison of these issues is limitedly presented in the literature despite its importance to benchmarking performance and identifying best CWM practices in the context of globalization whereby knowledge sharing has already transcended traditional country boundaries. The aim of this ex post facto research is to compare CWM profiles, practices, and performance in Australia, Europe (Europe refers to EU-27 member countries in the European Union, including Belgium, France, Germany, Italy, Luxembourg, Netherlands, Denmark, Great Britain, Ireland, Portugal, Spain, Greece, Austria, Finland, Sweden, Czech Republic, Estonia, Hungary, Latvia, Lithuania, Poland, Slovakia, Slovenia, Malta, Cyprus, Bulgaria, and Romania., Hong Kong, and the United Kingdom at a national-level, with a view to facilitating CWM knowledge sharing internationally. It does so by triangulating empirical data collected from various national statistical yearbooks with research papers and professional reports on CWM in these economies. It is found that in producing one million (US dollars’ work, construction contributes a volume of solid waste ranging from 28 to 121 tons among countries. Conscientious CWM practices can make a significant difference in reducing, reusing, or recycling construction waste, as evident in the large variation in the CWM performance. While it might be oversimplified to conclude that the best practices in one country can be applied in another, the research provides insightful references into sharing CWM knowledge across boundaries.

  15. Bench-to-bedside review: leadership and conflict management in the intensive care unit.

    Science.gov (United States)

    Strack van Schijndel, Rob J M; Burchardi, Hilmar

    2007-01-01

    In the management of critical care units, leadership and conflict management are vital areas for the successful performance of the unit. In this article a practical approach to define competencies for leadership and principles and practices of conflict management are offered. This article is, by lack of relevant intensive care unit (ICU) literature, not evidence based, but it is the result of personal experience and a study of literature on leadership as well on conflicts and negotiations in non-medical areas. From this, information was selected that was recognisable to the authors and, thus, also seems to be useful knowledge for medical doctors in the ICU environment.

  16. A Research on the Construction of University R&D Management Team in China

    Science.gov (United States)

    Jia, Ning

    2007-01-01

    The system of Chinese universities R&D as a branch of the system of the whole country R&D, has a great effect on the development and innovation of the country's science and technique. Consequently, it's important to construct an effective management team with high diathesis for University R&D management. Based on the statistics of the…

  17. Fluid management in the optimization of space construction

    Science.gov (United States)

    Snyder, Howard

    1990-01-01

    Fluid management impacts strongly on the optimization of space construction. Large quantities of liquids are needed for propellants and life support. The mass of propellant liquids is comparable to that required for the structures. There may be a strong dynamic interaction between the stored liquids and the space structure unless the design minimizes the interaction. The constraints of cost and time required optimization of the supply/resupply strategy. The proper selection and design of the fluid management methods for: slosh control; stratification control; acquisition; transfer; gauging; venting; dumping; contamination control; selection of tank configuration and size; the storage state and the control system can improve the entire system performance substantially. Our effort consists of building mathematical/computer models of the various fluid management methods and testing them against the available experimental data. The results of the models are used as inputs to the system operations studies. During the past year, the emphasis has been on modeling: the transfer of cryogens; sloshing and the storage configuration. The work has been intermeshed with ongoing NASA design and development studies to leverage the funds provided by the Center.

  18. [Construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province].

    Science.gov (United States)

    Zhao-Hui, Zheng; Jun, Qin; Li, Chen; Hong, Zhu; Li, Tang; Zu-Wu, Tu; Ming-Xing, Zeng; Qian, Sun; Shun-Xiang, Cai

    2016-10-09

    To analyze the construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province, so as to provide the reference for the standardized detection and management of schistosomiasis laboratories. According to the laboratory standard of schistosomiasis at provincial, municipal and county levels, the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. The management system was already occupied over all the laboratories of schistosomiasis control institutions and was officially running. There were 588 non-conformities and the inconsistency rate was 19.60%. The non-conformity rate of the management system of laboratory quality control was 38.10% (224 cases) and the non-conformity rate of requirements of instrument and equipment was 23.81% (140 cases). The management system has played an important role in the standardized management of schistosomiasis laboratories.

  19. Leadership skills for nursing unit managers to decrease intention to leave

    Directory of Open Access Journals (Sweden)

    Roche MA

    2015-05-01

    Full Text Available Michael A Roche,1 Christine Duffield,1,2 Sofia Dimitrelis,1 Belinda Frew1 1Centre for Health Services Management, Faculty of Health, University of Technology, Sydney, NSW, 2Clinical Nursing and Midwifery Research Centre, School of Nursing and Midwifery, Edith Cowan University, Joondalup, WA, Australia Aim: To examine specific elements of nursing leadership linked to intention to leave, in public acute care hospitals. Background: Nurse turnover is a global issue receiving widespread attention due to prolonged and projected workforce shortages. Nurse management and leadership qualities have been associated with intention to leave and turnover of nurses. The role of the nurse unit managers in the retention of nurses is becoming increasingly important, particularly because of their strong influence on the quality and stability of the work environment. Methods: Data were collected from 62 medical, surgical, and mixed units across eleven public acute care hospitals in three Australian states (September 2008 to August 2010. A total of 1,673 nurses completed a nurse survey that included measures of intention to leave and leadership aspects of the practice environment. Analyses explored specific leadership characteristics that were associated with turnover intent. Results: The role of nursing unit managers was confirmed to be a major factor in nurses’ intention to remain or leave their current workplace. Nurses valued “human” skills more highly than other leadership characteristics, including their manager’s connection with nurses’ concerns, clarity, participation in decisions, and encouragement. Conclusion: Strong leadership qualities in the nursing unit manager have been associated with greater job satisfaction, reduced turnover intention among nursing staff, and improved patient outcomes. Nurse leaders need to be supported in an effort to retain nurses given ongoing workforce issues and to ensure high-quality patient care. Keywords: nurse

  20. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  1. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  2. Mathematical Methods of Managing Economic Sustainability of the Construction Company

    Science.gov (United States)

    Kostuchenko, Vasiliy; Zdanov, Andrej; Rodionov, Anatolij

    2017-10-01

    This article presents a long-term research in developing innovative mathematical techniques of managing the contractor’s economic sustainability proven by some experimental studies. The article aims at presenting some practical results of applying these techniques to the scientific community. This research presents a description of some applied mathematical models, views, and some results of their practical application in the applied field for the purposes of evaluating operational sustainability and minimizing losses in the process of managing the company. The authors have put the technology they have developed to practical use, and the article presents the results of such application. The authors have put the developed technology to practical use. Company management also means the management of power consumption, which is highly vital both for the construction and maintenance of buildings and structures. The articles also dwell on some possible improvements of managing energy consumption within the framework of the general management of company’s economic sustainability, because these phenomena have a tight organic interdependence. The authors continue researching this direction in order to improve the production efficiency of the proposed technologies as well as to eliminate some drawbacks they have spotted.

  3. Experiences from implementation of ICT for resource management in small construction companies

    DEFF Research Database (Denmark)

    Svidt, Kjeld; Christiansson, Per

    2006-01-01

    This paper summarizes experiences from the process of implementation of ICT-based systems for resource management in small construction companies. The initial decision process, system requirements specification and integration, education and staff training, and end user experiences were followed ...

  4. An Exploration of the Perspectives of Associate Nurse Unit Managers Regarding the Implementation of Smoke-free Policies in Adult Mental Health Inpatient Units.

    Science.gov (United States)

    Dean, Tania D; Cross, Wendy; Munro, Ian

    2018-04-01

    In Adult Mental Health Inpatient Units, it is not unexpected that leadership of Associate Nurse Unit Managers contributes to successful implementation of smoke-free policies. In light of challenges facing mental health nursing, and limited research describing their leadership and the role it plays in addressing smoke-free policy implementation, the aim of this study is to explore Associate Nurse Unit Managers perspectives' regarding the implementation of smoke-free policies, which were introduced on 1 July, 2015. Individual in-depth semi-structured interviews were undertaken six months post the implementation of smoke-free policies. In this qualitative descriptive study, six Associate Nurse Unit Managers working in a Victorian public Adult Mental Health Inpatient Unit, were asked eight questions which targeted leadership and the implementation and enforcement of smoke-free policies. Associate Nurse Unit Managers provide leadership and role modeling for staff and they are responsible for setting the standards that govern the behavior of nurses within their team. All participants interviewed believed that they were leaders in the workplace. Education and consistency were identified as crucial for smoke-free policies to be successful. Participants acknowledged that the availability of therapeutic interventions, staff resources and the accessibility of nicotine replacement therapy were crucial to assist consumers to remain smoke-free while on the unit. The findings from this research may help to improve the understanding of the practical challenges that Associate Nurse Unit Manager's face in the implementation of smoke-free policies with implications for policies, nursing practice, education and research.

  5. Wood products used in constructing conservation and development projects by the Corps of Engineers in the United States, 1962 and 1978

    Science.gov (United States)

    W. H. Reid; D. B. McKeever

    Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...

  6. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  7. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  8. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  9. Causes of construction cost and time overruns: The 2010 FIFA World ...

    African Journals Online (AJOL)

    the FIFA World Cup remains a sought after goal for any country. Due to the magnitude ... unit of measure, the quantitative results from measuring against original project ... already identified (Dell'Apa, 2008), the South African construction industry started ... A study completed by the International Program in the Management.

  10. The Development Strategies for the Management Models of the Electronic Documents and Records in the United States, United Kingdom and Australia

    Directory of Open Access Journals (Sweden)

    Chiu-Yen Lin

    2015-06-01

    Full Text Available The trend toward electronic government has espoused a large quantity of electronic records, which challenge the existing records management models in the modern countries. This paper describes and compares the development and transition toward electronic records management in the United States, United Kingdom, and Australia to show how the three advanced countries evolved the government records management practices. The analysis emphasized on the holistic policy initiative perspective and compared the directives and regulations, research and development programs and plans, the emerging structures of governance, staffing and professional training, and risk management provisions. The comparison may shed lights on the government electronic management in the other countries. [Article content in Chinese

  11. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  12. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  13. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    Science.gov (United States)

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.

  14. Cooling tower, construction method method therefor and precast prestressed concrete building units

    International Nuclear Information System (INIS)

    Lin, T.Y.; Yang, Y.C.

    1978-01-01

    A large, thin-shell cooling tower, a method for its erection, and novel precast units are described. Upon a foundation a series of angularly-extending columns is erected, and the columns are joined at their upper ends by a lower ring. Then a ribbed, waffle-like reinforced concrete wall is constructed to extend up from the lower ring and to provide a shell with a shape such as a hyperbolic paraboloid. The ribbed outer (or inner) surface strengthens the structure while enabling the thickness of the portions in between the ribs to be relatively thin. A series of vertically-spaced horizontal circumferential reinforcing bars or post-tensioning cables and a series of horizontally-spaced vertical or inclined bars or cables are included in the wall. The wall is preferably made up from a series of precast units that are of novel structure in themselves. At the top of the wall is an upper ring joining the various elements together

  15. A Conceptual Model for Delineating Land Management Units (LMUs Using Geographical Object-Based Image Analysis

    Directory of Open Access Journals (Sweden)

    Deniz Gerçek

    2017-06-01

    Full Text Available Land management and planning is crucial for present and future use of land and the sustainability of land resources. Physical, biological and cultural characteristics of land can be used to define Land Management Units (LMUs that aid in decision making for managing land and communicating information between different research and application domains. This study aims to describe the classification of ecologically relevant land units that are suitable for land management, planning and conservation purposes. Relying on the idea of strong correlation between landform and potential landcover, a conceptual model for creating Land Management Units (LMUs from topographic data and biophysical information is presented. The proposed method employs a multi-level object-based classification of Digital Terrain Models (DTMs to derive landform units. The sensitivity of landform units to changes in segmentation scale is examined, and the outcome of the landform classification is evaluated. Landform classes are then aggregated with landcover information to produce ecologically relevant landform/landcover assemblages. These conceptual units that constitute a framework of connected entities are finally enriched given available socio-economic information e.g., land use, ownership, protection status, etc. to generate LMUs. LMUs attached to a geographic database enable the retrieval of information at various levels to support decision making for land management at various scales. LMUs that are created present a basis for conservation and management in a biodiverse area in the Black Sea region of Turkey.

  16. Study and practice on NI design management of the first AP1000 plant

    International Nuclear Information System (INIS)

    Jiang Feizhou

    2014-01-01

    For difficulties on NI design management during the construction of the world's first AP1000 unit, Sanmen Nuclear Power Corporation has established the effective method to improve the management of the NI design and the project construction based on the practice and improvement. This paper introduces difficulties on NI design management, and analyzes the causes of problems, and put forward recommended measures, to provide help and reference for the construction of similar nuclear power plants. (authors)

  17. Scale model helps Duke untie construction snags

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    A nuclear power plant model, only 60 percent complete, has helped Duke Power identify over 150 major design interferences, which, when resolved, will help cut capital expense and eliminate scheduling problems that normally crop up as revisions are made during actual plant construction. The model has been used by construction, steam production, and design personnel to recommend changes that should improve material handling, operations, and maintenance procedures as well as simplifying piping and cabling. The company has already saved many man-hours in material take-off, material management, and detailed drafting and expects to save even more with greater use of, and improvement in, its modeling program. Duke's modeling program was authorized and became operational in November 1974, with the first model to be the Catawba Nuclear Station. This plant is a two-unit station using Westinghouse nuclear steam supply systems in tandem with General Electric turbine-generators, horizontal feedwater heaters, and Foster Wheeler triple pressure condensers. Each unit is rated 1142 MWe

  18. Women Leaders' Construction of Leadership and Management of the Academic Department

    Science.gov (United States)

    Zulu, C. B.

    2011-01-01

    Research on women in leadership has received growing attention in recent years. But not enough studies have investigated the way women construct leadership and management of the academic department. This article reports on the findings of an inquiry into the experiences of women heads of academic departments (HoDs) at universities in South Africa…

  19. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  20. Evolution of the constructive adobe system in the Porcelain Industrial Unit of Vista Alegre (1937-1945

    Directory of Open Access Journals (Sweden)

    Alice Ruano

    2010-01-01

    Full Text Available The urban nucleus of the Porcelain Factory of Vista Alegre reveals a special interest in terms of the evolution of the traditional adobe construction in the town of Ílhavo, located in the district of Aveiro. Presenting a structured philosophy of intervention in the territory since its very beginning, it possesses a rich heritage in the field of construction and architecture. The measures planned and implemented in the second phase of Vista Alegre growth reporting its beginning to the ends of the 30's, and along the 40's, confirm it both in the rehabilitation, extension and new constructions in adobe masonry. Those measures were implemented during the structural changes of the Industrial Unit administration that only until this period belonged to the family of its founder. These changes creates one of the focus of innovation in the region, with new construction strategies and solutions in adobe buildings, which will prolonged the period of use of this construction system, noticeable in buildings dated of 1958 in the Vista Alegre and at least in 1970 in the town.

  1. Science, society, and America's nuclear waste: Unit 4, The waste management system

    International Nuclear Information System (INIS)

    1992-01-01

    This is unit 4 (The Waste Management System) in a four-unit secondary curriculum. It is intended to provide information about scientific and societal issues related to the management of spent nuclear fuel from generation of electricity at nuclear powerplants and high-level radioactive waste from US national defense activities. The curriculum, supporting classroom activities, and teaching materials present a brief discussion of energy and electricity generation, including that produced at nuclear powerplants; information on sources, amounts, location, and characteristics of spent nuclear fuel and high-level radioactive waste; sources, types and effects of radiation; US policy for managing and disposing of spent nuclear fuel and high-level radioactive waste and what other countries are doing; and the components of the nuclear waste management system

  2. Construction and psychometric testing of the EMPATHIC questionnaire measuring parent satisfaction in the pediatric intensive care unit

    NARCIS (Netherlands)

    Latour, Jos M.; van Goudoever, Johannes B.; Duivenvoorden, Hugo J.; Albers, Marcel J. I. J.; van Dam, Nicolette A. M.; Dullaart, Eugenie; van Heerde, Marc; de Neef, Marjorie; Verlaat, Carin W. M.; van Vught, Elise M.; Hazelzet, Jan A.

    To construct and test the reliability and validity of the EMpowerment of PArents in THe Intensive Care (EMPATHIC) questionnaire measuring parent satisfaction in the pediatric intensive care unit (PICU). Structured development and psychometric testing of a parent satisfaction-with-care instrument

  3. Construction and psychometric testing of the EMPATHIC questionnaire measuring parent satisfaction in the pediatric intensive care unit

    NARCIS (Netherlands)

    Latour, J.M.; van Goudoever, J.B.; Duivenvoorden, H.J.; Albers, M.J.I.J.; van Dam, N.A.M.; Dullaart, E.; van Heerde, M.; de Neef, M.; Verlaat, C.W.M.; van Vught, E.M.; Hazelzet, J.A.

    2011-01-01

    To construct and test the reliability and validity of the EMpowerment of PArents in THe Intensive Care (EMPATHIC) questionnaire measuring parent satisfaction in the pediatric intensive care unit (PICU). Structured development and psychometric testing of a parent satisfaction-with-care instrument

  4. Santee Cooper cross units 3 & 4: an EPCM success

    Energy Technology Data Exchange (ETDEWEB)

    Hickson, K.; Neher, S.; Koontz, N. [WorleyParons (United States)

    2009-05-15

    In late 2001, Santee Cooper began a project to add a third 600 MW unit to its coal-fired Cross Generating Station in Cross, S.C. Plans also included a fourth unit to be added later. The engineering, procurement and construction (EPCM) of Units 3 and 4 would eventually span almost seven years. The Cross Project demonstrates how Santee Cooper empowered its EPCM contractor to manage for change and how a well conceived plan and thoroughly developed schedule provide the necessary structure and flexibility to successful do so. The Cross Project experience reinforces the idea that for large projects an EPCM arrangement provides the agility necessary to manage change and the means to manage risk. The design, furnish and erect contracts were performance based contracts executed early to firm up the plant design and layout. 2 photos.

  5. Construct validity in Operations Management by using Rasch Measurement Theory. The case of the construct “motivation to implement continuous improvement"

    Directory of Open Access Journals (Sweden)

    Lidia Sanchez-Ruiz

    2016-12-01

    Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.

  6. The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam

    Science.gov (United States)

    Tripoli; Mubarak; Nurisra; Mahmuddin

    2018-05-01

    This paper discusses the implementation of Indonesian National Standard (SNI) 7394: 2008 on procedures for calculating the unit price of concrete work for the construction of building and housing. The standard provides some reinforced concrete constructions unit price (UP) analysis by specified the total number of reinforcing uses. Related to reinforced concrete beam work (Analysis No. 6.31), the reinforcement requirement is stated at 200 kg/m3 of concrete. Once the implementation considers various earthquake zoning, the question will arise about the extent to which the standard is feasible to apply. Therefore, this research aimed to analyze the possibility of UP standard implementation by certain earthquake zonation. This research is focused on the construction of reinforced concrete beam for buildings with function as educational, residential and office buildings. The data used are sourced from 21 buildings in two zones in Aceh Province, covering Zone 10 and Zone 15 based on earthquake map of SNI 1726: 2012. The analysis results indicate that the UP standard for reinforced concrete beam cannot be applied to all zoning. The UP standard is only possible on buildings constructed in Zone 10 or zonation with seismic spectral response 0.6g to 0.7g or lower.

  7. The United States initiative for international radioactive source management (ISRM)

    International Nuclear Information System (INIS)

    Naraine, N.; Karhnak, J.

    1999-01-01

    The United States takes seriously the potential problems from uncontrolled radioactive sources. To address these problems, the United States Department of State is leading the development of an initiative for International Radioactive Source Management (ISRM). The Department of State, through a number of Federal and state agencies, regulatory bodies and private industry, will endeavor to provide coordinated support to the international community, particularly through IAEA, to assist in the development and implementation of risk-based clearance levels to support import/export of radioactive contaminated metals and the tracking, management, identification, remediation, and disposition of 'lost sources' entering nation states and targeted industries. The United States believes that the international control of radioactive sources is critical in avoiding wide-spread contamination of the world metal supply. Thus the initiative has four objectives: (1) Protect sources from becoming lost (Tracking management); (2) Identify primary locations where sources have been lost (Stop future losses); (3) Locate lost sources (monitor and retrieve); and (4) Educate and train (deploy knowledge and technology). A number of efforts already underway in the United States support the overall initiative. The EPA has provided a grant to the Conference of Radiation Program Control Directors (CRCPD) to develop a nation-wide program for the disposition of orphaned radioactive sources. This program now has internet visibility and a toll-free telephone number to call for assistance in the disposal of sources. The Nuclear Regulatory Commission (NRC), the Department of Energy (DOE), and other government agencies as well as private companies are assisting CRCPD in this program. The NRC has begun a program to improve control of radioactive sources in the United States, and also intends to promulgate a regulation defining conditions for the release of materials from licensed facilities. The DOE is

  8. Construction of Network Management Information System of Agricultural Products Supply Chain Based on 3PLs

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The necessity to construct the network management information system of 3PLs agricultural supply chain is analyzed,showing that 3PLs can improve the overall competitive advantage of agricultural supply chain.3PLs changes the homogeneity management into specialized management of logistics service and achieves the alliance of the subjects at different nodes of agricultural products supply chain.Network management information system structure of agricultural products supply chain based on 3PLs is constructed,including the four layers (the network communication layer,the hardware and software environment layer,the database layer,and the application layer) and 7 function modules (centralized control,transportation process management,material and vehicle scheduling,customer relationship,storage management,customer inquiry,and financial management).Framework for the network management information system of agricultural products supply chain based on 3PLs is put forward.The management of 3PLs mainly includes purchasing management,supplier relationship management,planning management,customer relationship management,storage management and distribution management.Thus,a management system of internal and external integrated agricultural enterprises is obtained.The network management information system of agricultural products supply chain based on 3PLs has realized the effective sharing of enterprise information of agricultural products supply chain at different nodes,establishing a long-term partnership revolving around the 3PLs core enterprise,as well as a supply chain with stable relationship based on the supply chain network system,so as to improve the circulation efficiency of agricultural products,and to explore the sales market for agricultural products.

  9. Radioactive air emissions notice of construction portable/temporary radioactive air emission units - August 1998

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    1999-01-01

    This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type III). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a

  10. Managing the nuclear utility

    International Nuclear Information System (INIS)

    Williams, J.W. Jr.

    1985-01-01

    The Florida Power and Light Company (FP and L) is the fifth largest investor-owned utility in the country. The success of nuclear power generation at the St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 has resulted from a continuing management commitment to the nuclear program. The management of the power plants rely strongly on teamwork for most large projects and activities whether they entail plant operation, construction, or maintenance. Various examples of how teamwork has been used to realize the successful completion of projects or solutions to problems are given

  11. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  12. Nurses' perception of their manager's leadership style and unit climate: are there generational differences?

    Science.gov (United States)

    Farag, Amany A; Tullai-McGuinness, Susan; Anthony, Mary K

    2009-01-01

    To describe and compare how nurses representing four age cohorts perceive their manager's leadership style and unit climate. The current workforce consists of nurses representing four generational cohorts. Nursing literature suggests that nurses from each age cohort think, behave and approach work differently. Limited empirical evidence, however, exists about how nurses from each age cohort perceive two aspects of their work environment: their managers' leadership style and unit climate. This cross-sectional, descriptive survey was conducted using a convenience sample of 475 registered nurses working in different inpatient units in three community non-magnet hospitals. Only nurses from Boomer and Gen-Xers had sufficient representation to be included in the data analysis. Nurses from the two main age cohorts did not differ in their perceptions of their manager's leadership style. Significant differences were found in two unit climate dimensions. The Gen-Xers had a less favourable perception of their unit climate related to warmth and belonging and administrative support. Nurse manager's might reflect on how they interact with different age cohorts; and to involve nurses from various age cohorts in the development of policies to create a flexible work environment.

  13. Quality of care assessment in geriatric evaluation and management units: construction of a chart review tool for a tracer condition

    Directory of Open Access Journals (Sweden)

    Latour Judith

    2009-07-01

    Full Text Available Abstract Background The number of elderly people requiring hospital care is growing, so, quality and assessment of care for elders are emerging and complex areas of research. Very few validated and reliable instruments exist for the assessment of quality of acute care in this field. This study's objective was to create such a tool for Geriatric Evaluation and Management Units (GEMUs. Methods The methodology involved a reliability and feasibility study of a retrospective chart review on 934 older inpatients admitted in 49 GEMUs during the year 2002–2003 for fall-related trauma as a tracer condition. Pertinent indicators for a chart abstraction tool, the Geriatric Care Tool (GCT, were developed and validated according to five dimensions: access to care, comprehensiveness, continuity of care, patient-centred care and appropriateness. Consensus methods were used to develop the content. Participants were experts representing eight main health care professions involved in GEMUs from 19 different sites. Items associated with high quality of care at each step of the multidisciplinary management of patients admitted due to falls were identified. The GCT was tested for intra- and inter-rater reliability using 30 medical charts reviewed by each of three independent and blinded trained nurses. Kappa and agreement measures between pairs of chart reviewers were computed on an item-by-item basis. Results Three quarters of 169 items identifying the process of care, from the case history to discharge planning, demonstrated good agreement (kappa greater than 0.40 and agreement over 70%. Indicators for the appropriateness of care showed less reliability. Conclusion Content validity and reliability results, as well as the feasibility of the process, suggest that the chart abstraction tool can gather standardized and pertinent clinical information for further evaluating quality of care in GEMU using admission due to falls as a tracer condition. However, the GCT

  14. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  15. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  16. Science, society, and America's nuclear waste: Unit 4, The waste management system

    International Nuclear Information System (INIS)

    1992-01-01

    This is the teachers guide to unit 4, (The Waste Management System), of a four-unit secondary curriculum. It is intended to provide information about scientific and societal issues related to the management of spent nuclear fuel from generation of electricity at nuclear powerplants and high-level radioactive waste from US national defense activities. The curriculum, supporting classroom activities, and teaching materials present a brief discussion of energy and electricity generation, including that produced at nuclear powerplants; information on sources, amounts, location, and characteristics of spent nuclear fuel and high-level radioactive waste; sources, types and effects of radiation; US policy for managing and disposing of spent nuclear fuel and high-level radioactive waste and what other countries are doing; and the components of the nuclear waste management system

  17. The weaknesses of China's contractors in overseas construction project management: 2 case studies

    Directory of Open Access Journals (Sweden)

    Ph. D. Mo Xuan

    2012-05-01

    Full Text Available The practices of international construction contracting have been prevalent increasingly over the past half a centuru, Altough the contractors of highly developed world have dominated this field, there tends to be more players from newly emerging countries like China. The history of China's contractors performing in the overseas construction markets is divided into 3 major phases, namely the planning economy era, reform and openness perios and the latest nwe millennium. However, the know-how and techniques of modern project management have been widely deployed in China for merely 2 decades. While competing with those veterans in overseas markets, China's contractors still lack adequate advantages as well as experiences, leading to the underperformance or even failures. A 2-dimension framework of overseas project management, comprising the external risk and internal function aspects , is proposed. Based on the analysis of 2 recent cases in Saudi Arabia an Poland respectively, it's foung that the low cost strategy management in risk, commerce, cost, human resources, etc. are their fatal weaknesses.

  18. Study on time management of FCD concrete pouring AP1000 NPP and its application

    International Nuclear Information System (INIS)

    Wu Jie; Yang Ming; Cong Jiuyuan

    2010-01-01

    Haiyang nuclear power plant adopts the advanced third-generation nuclear power technology, AP1000, the design concept of passive system and the methods of modularization and 'open-top' construction greatly shortens the construction period. At the same time, higher requirements are put forward to the management of construction, quality and progress control. This paper will apply the statistical process control theory and method to the time management of FCD (First Concrete Day) to Unit 1 of Haiyang AP1000 nuclear power plant, and it brings up the mathematical model of time management based on verification through modeling, data analysis, model optimization and the actual construction work. The theory and method studied in this paper can not be only applied to the FCD concrete pouring for Unit 1 of Haiyang AP1000 nuclear power plant, but also have great referential and guiding significance to the continuous concreting of the mass concrete of the follow-up similar construction. (authors)

  19. Defining management units for cetaceans by combining genetics, morphology, acoustics and satellite tracking

    Directory of Open Access Journals (Sweden)

    Signe Sveegaard

    2015-01-01

    Full Text Available Managing animal units is essential in biological conservation and requires spatial and temporal identification of such units. Since even neighbouring populations often have different conservation status and face different levels of anthropogenic pressure, detailed knowledge of population structure, seasonal range and overlap with animals from neighbouring populations is required to manage each unit separately. Previous studies on genetic structure and morphologic separation suggests three distinct populations of harbour porpoises with limited geographic overlap in the North Sea (NS, the Belt Sea (BS and the Baltic Proper (BP region. In this study, we aim to identify a management unit for the BS population of harbour porpoises. We use Argos satellite data and genetics from biopsies of tagged harbour porpoises as well as acoustic data from 40 passive acoustic data loggers to determine management areas with the least overlap between populations and thus the least error when abundance and population status is estimated. Discriminant analysis of the satellite tracking data from the BS and NS populations showed that the best fit of the management unit border during the summer months was an east–west line from Denmark to Sweden at latitude 56.95°N. For the border between BS and BP, satellite tracking data indicate a sharp decline in population density at 13.5°E, with 90% of the locations being west of this line. This was supported by the acoustic data with the average daily detection rate being 27.5 times higher west of 13.5°E as compared to east of 13.5°E. By using this novel multidisciplinary approach, we defined a management unit for the BS harbour porpoise population. We recommend that these boundaries are used for future monitoring efforts of this population under the EU directives. The boundaries may also be used for conservation efforts during the summer months, while seasonal movements of harbour porpoises should be considered during

  20. Closure of hazardous and mixed radioactive waste management units at DOE facilities

    International Nuclear Information System (INIS)

    1990-06-01

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA