WorldWideScience

Sample records for management plan volume

  1. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  2. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  3. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1995-08-01

    The Hanford Site Integrated Stabilization Management Plan (SISMP) is being developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutoniumbearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

  4. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  5. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    Science.gov (United States)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  6. Natural resource management plan : Volume I : Department of the Army, Rocky Mountain Arsenal

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Natural resource management plan for the Rocky Mountain Arsenal (RMA) was prepared by Colorado State University for the U.S. Government to guide management to...

  7. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1996-03-15

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

  8. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP.

  9. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1996-09-23

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

  10. Proposed Owyhee resource management plan and final environmental impact statement, Volume 2

    OpenAIRE

    U.S. Bureau of Land Management

    1999-01-01

    Five alternatives are described and analyzed in the final Environmental Impact Statement. Alternative A is a continuation of current management. Alternative B was developed through BLM staff interpretation and analysis of information submitted by the Owyhee Country Commissioners with the assistance of the Owyhee County Natural Resources Committee. Alternative C was developed by the BLM lower Snake River District interdisciplinary planning team. Alternative D was developed through BLM staff in...

  11. Planning manual for energy resource development on Indian lands. Volume II. Management and contractual arrangements

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This volume explores options for strengthening tribal control of energy-resource-development activities on their reservations. These options fall into two major categories: improvement of the tribe's internal administrative capability to plan, monitor, and regulate development activities; Part I of this volume addresses how this can be done. Another option deals with stronger and more-explicit contract terms in the development, agreement, and enforcement of those terms; Part II deals with this subject. In order to develop an effective control system, a tribe must be concerned with both of these areas. Contract stipulations will not be effective unless the tribe can ensure that they are enforced. Likewise, in monitoring and regulating company activities, a tribe is in a stronger position if it is backed up by contract terms governing operations on the reservation. The Tribes participating in this study have different levels of managerial capability and technical expertise in the energy field. Their interest in stronger controls on development varies. Therefore, a range of options is suggested.

  12. Energy Management Plan.

    Science.gov (United States)

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  13. Energy planning and management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  14. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  15. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  16. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  17. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  18. Wolf management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A memorandum from the Assistant Region Director, Refuges and Wildlife to all U.S. Fish and Wildlife refuge managers regarding the public planning effort on wolf...

  19. Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following plan is the result of a recent initiative in Region 5 to produce general management guidance based on stated objectives for individual field stations....

  20. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  1. Fire Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan considers fire on Erie as a tool for management and as a potential problem to be dealt with. This document discusses environmental impacts and alternatives...

  2. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  3. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  4. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  5. TWRS safety management plan

    Energy Technology Data Exchange (ETDEWEB)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  6. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  7. Types of Managed Care Plans

    Science.gov (United States)

    ... Size Email Print Share Types of Managed Care Plans Page Content Article Body ​Managed care plans have ... to any deductible you must meet. High Deductible Plans (HDP): HDPs, also known as consumer directed health ...

  8. Resource management plan for the Oak Ridge Reservation. Volume 29, Rare plants on the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, M. [Science Applications International Corp., Oak Ridge, TN (United States); Pounds, L. [Tennessee Univ., Knoxville, TN (United States); Oberholster, S. [USDA Forest Service, Montgomery, AL (United States); Parr, P.; Mann, L. [Oak Ridge National Lab., TN (United States); Edwards, L. [Clemson Univ., SC (United States). Dept. of Forestry; Rosensteel, B. [JAYCOR Environmental, Vienna, VA (United States)

    1993-08-01

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy`s Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated.

  9. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  10. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  11. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  12. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  13. Eleventh annual Department of Energy low-level waste management conference. Volume 2: Low-level waste strategy and planning, decontamination and decommissioning, compliance monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    Nineteen papers are presented in volume 2. The 11 papers in the LLW Strategy and Planning section discuss plans for disposal facilities in Texas, Pennsylvania, Hanford, the Southwest and Southeast Compacts, and others. Three papers discuss decontamination technology and activities. Environmental monitoring requirements and recommendations at LLW facilities are discussed in 5 papers. Papers have been processed separately for inclusion on the data base.

  14. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  15. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  16. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  17. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  18. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  19. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  20. Morris Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Morris Wetland Management District Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  1. Strategic Management for Organizational Effectiveness. The Effect of Human Resource Planning on Retention and Related Issues. Volume 3.

    Science.gov (United States)

    1984-12-01

    Science, 1971, 17. Peters, Thomas J., and Robert H. Waterman. In Search of Excellence. New York: Harper and Row, 1982. Pfeffer , Jeffrey ...market wages and so is not particularly liked. A-3. The HRM System and Mobility The human resource management system within each of the participant...a highly turbulent environment, the HRM system plays a less obvious and visible role than for those organizations which exist in a stable environment

  2. Bison and Elk Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Bison and Elk Management Plan is to provide managers with goals, objectives, and strategies for managing bison and elk on the National Elk Refuge...

  3. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  4. Kulm Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this habitat management plan (HMP) is to provide a strategic plan for consistently and effectively protecting, acquiring, enhancing, restoring, and...

  5. Nuclear Employment Planning. Volume 4. Data Dictionary

    Science.gov (United States)

    1990-12-01

    3398 t• DNA-TR-90-33-V4 Nuclear Employment Planning OIPU EWE COPY Volume IV-Data Dictionary Donald W. Doerfler D TIC Lowry A. West ELECTE Debora R...DNA 001 -88-C-0068 Volume IV--Data Dictionary PE 62715HPR - RW 6. AUTHOR(S) TA - RN Donald W. Doerfler , Lowry A. West, WU - DH042980 Debora R. Gleason

  6. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  7. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  8. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume I. Summary, objectives and management. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-01

    This document defines a plan for conducting selected aspects of the engineering testing required for magnetic fusion reactor FWBS components and systems. The ultimate product of this program is an established data base that contributes to a functional, reliable, maintainable, economically attractive, and environmentally acceptable commercial fusion reactor first wall, blanket, and shield system. This program plan updates the initial plan issued in November of 1980 by the DOE/Office of Fusion Energy (unnumbered report). The plan consists of two parts. Part I is a summary of activities, responsibilities and program management including reporting and interfaces with other programs. Part II is a compilation of the Detailed Technical Plans for Phase I (1982 to 1984) developed by the participants during Phase 0 of the program (July to December 1981).

  9. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  10. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  11. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  12. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  13. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  14. Management Plan: Parts I & II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Management Plan guides the long-range development of the Refuge by identifying and integrating appropriate habitats,...

  15. Fishery Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A plan stating the slot limits and other fishing regulations on Noxubee National Wildlife Refuge. The slot limits were put in place to encourage removal of excessive...

  16. Managing Changes in Building Plans.

    Science.gov (United States)

    Schoolhouse of Quality, 2000

    2000-01-01

    Examines why school building plans get modified, how it affects the new school, and what can be done to plan for it. The role of the architect in managing change and use of a contingency fund are discussed as are the five types of changes that can happen and how they should be paid for. (GR)

  17. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  18. Hanford site sodium management plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  19. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  20. HABITAT MANAGEMENT PLAN, INTEGRATED PEST MANAGEMENT PLAN, AND VISITOR SERVICES PLAN FOR SAM D. HAMILTON NOXUBEE NATIONAL WILDLIFE REFUGE

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains 3 major plans including the Habitat Management Plan, the Integrated Pest Management Plan and the Visitor Services Plan. These plans provide...

  1. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  2. Mississippi Sandhill Crane NWR Forest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mississippi Sandhill Crane NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  3. Forest Management Plan : Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  4. Forest Management Plan : Eufaula National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Eufaula National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  5. Forest Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  6. Draft Strategic Laboratory Missions Plan. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

  7. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  8. Total Quality Management Implementation Plan.

    Science.gov (United States)

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  9. Management Planning: Innovation on Campus.

    Science.gov (United States)

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  10. Capacity Planning and Leadtime management

    NARCIS (Netherlands)

    Zijm, Willem H.M.; Buitenhek, R.

    1996-01-01

    In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities

  11. LSHTM Data Management Plan for research projects

    OpenAIRE

    Knight, G

    2017-01-01

    A Data Management Plan is a planning document that outlines the decisions made on how data will be created, managed and used during a project. This document provides a template for use when planning data management activities in your research. Completed plans should be emailed to for comment.

  12. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  13. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  14. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  15. Ottawa National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ottawa NWR Cropland Management Plan addresses management practices of refuge land and serves as a guide to future management of cropland and moist soil management.

  16. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  17. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  18. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  19. Annual water management plan 1995-1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  20. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  1. Forest Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest...

  2. Litchfield Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Litchfield Wetland Management District for the next 15 years. This plan outlines the...

  3. Fur Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck NWR Fur Management Plan directs the management and regulation of trapping. The plan provides a description of the Refuge, describes the relation of...

  4. Forest Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney National Wildlife Refuge Forest Management Plan is a general plan which outlines the management objectives, forest descriptions and silviculture of various...

  5. Grassland Management Plan : Trempealeau National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Trempealeau National Wildlife Refuge Grassland Management Plan provides guidelines for grassland habitat preservation and management. The goals of this plan aim...

  6. Station Management Plan Maine Coastal Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan outlines how four Maine refuges and twelve islands and one peninsula should be managed over the next three to five years. Plan results are...

  7. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  8. Solid Waste Management Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  9. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  10. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  11. Blackwater National Wildlife Refuge Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Blackwater National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  12. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  13. Fur Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  14. Management plan abstract and keyword generator

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fill-in-the-blank Word form will generate abstracts for common management plans including: cropland management, disease contingency, fire management, fishing,...

  15. Furbearer Management Plan : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  16. Chautauqua National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chautauqua National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  17. Refuge Management Plan, Part III : Chapter 2 : Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  18. Advances in Serials Management. Volume 6.

    Science.gov (United States)

    Hepfer, Cindy, Ed.; Gammon, Julia, Ed.; Malinowski, Teresa, Ed.

    In order to further discussion and support constructive change, this volume presents the following eight papers on various dimensions of serials management: (1) "CD-ROMs, Surveys, and Sales: The OSA [Optical Society of America] Experience" (Frank E. Harris and Alan Tourtlotte); (2) "Management and Integration of Electronic Journals into the…

  19. Advances in Serials Management. Volume 6.

    Science.gov (United States)

    Hepfer, Cindy, Ed.; Gammon, Julia, Ed.; Malinowski, Teresa, Ed.

    In order to further discussion and support constructive change, this volume presents the following eight papers on various dimensions of serials management: (1) "CD-ROMs, Surveys, and Sales: The OSA [Optical Society of America] Experience" (Frank E. Harris and Alan Tourtlotte); (2) "Management and Integration of Electronic Journals into the…

  20. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  1. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  2. Fish Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fish Management Plan for Muscatatuck NWR. The Plan provides an introduction to the Refuge, a description of the area, a description of the fish resource...

  3. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  4. Spring Creek Common Allotment habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management plan for the Spring Creek Common Allotment on Charles M. Russell National Wildlife Refuge, in McCone and Garfield Counties, Montana. This plan discusses...

  5. Santee National Wildlife Refuge Fire Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Fire Management Plan is to provide objectives and guidelines for managingthe 15,095 acres of the Santee National Wildlife Refuge. This plan will...

  6. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  7. Financial Management System. Volume I.

    Science.gov (United States)

    1980-01-01

    be either "planned" or "actual". FMS can re- flect the position of new Efforts within the procurement cycle . An Effort consists of two levels in FMS...A field carnot belong to more than one record. Data type. A field can be of type string (text), integer, floating point (decimal), dollar amount, or...Continue on reverse side if needed)" F74-VARIABLE-KEY VI: TPO stid (initialized) V2: stid of first Effort in sequence V3: handle of first PR VIO

  8. Kirtland's Warbler Wildlife Management Area Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kirtland's Warbler Wildlife Management Area Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  9. National waste terminal storage program: Office of Nuclear Waste Isolation Technical Program Plan. Volume 1, Technical Overview

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-16

    A Technical Program Plan was developed detailing projected activities toward the development and operation of a geologic waste repository. This volume presents the overall program in summary fashion: objectives, technical scope, technical approach, schedule plan, FY 1979 budget and milestone plan, organization, management processes, and nuclear waste isolation issues. 8 figures, 8 tables. (DLC)

  10. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  11. Predicting patient volume in cardiac catheterization laboratory to improve resource management.

    Science.gov (United States)

    Liu, Jianhua; Santangelo, Jennifer; James, Randy; Watters, Coyt D; Orsini, Anthony; Mekhjian, Hagop; Kamal, Jyoti

    2008-11-06

    Using historical data within the Information Warehouse of the Ohio State University Medical Center, prediction on daily patient volume to catheterization laboratory was attempted to facilitate resource management and planning.

  12. Lower Hatchie Forest Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Forest Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  13. Montezuma National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Montezuma National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  14. Rocky Mountain Arsenal : 2006 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  15. Rocky Mountain Arsenal : 2007 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  16. Wilderness Management Plan: Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Wilderness Management Plan for Tamarac NWR provides an introduction to the Refuge; a description of the Wilderness Area; a summary of management practices;...

  17. Fisheries Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fisheries Management Plan for Muscatatuck NWR provides an introduction to the Refuge, summarizes the relationship of fishery management to Refuge objectives,...

  18. Muscatatuck National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  19. Water Management Plan Recommendations for 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This memorandum outlines the management strategy for water level management on St. Vincent Island in 2007. A table of planned water levels for each month is provided...

  20. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  1. Lacassine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lacassine National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  2. Chincoteague National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chincoteague National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  3. Agassiz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  4. Fire management plan Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to initiate the integrated program of fire management. Component management actions will include suppression (including the appropriate...

  5. Sabine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sabine NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  6. Mandalay National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mandalay NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  7. Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-19

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

  8. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  9. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  10. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed o...

  11. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  12. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  13. Managing Dualities in Planned Change Initiatives

    Science.gov (United States)

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  14. Planning and managing the physician workforce

    OpenAIRE

    Schoenbaum Stephen C

    2012-01-01

    Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and pro...

  15. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  16. Draft Site Treatment Plan (DSTP), Volumes I and II

    Energy Technology Data Exchange (ETDEWEB)

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.

  17. Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fur management plan for Stillwater Wildlife Management Area outlines methods of fur harvest, trapping territories, selection of trappers, trapping equipment,...

  18. Integrated Pest Management Plan Kulm Wetland Management District 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  19. Amendment I : Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This amendment to the fur management plan for Stillwater Wildlife Management area calls for the annual trapping of beaver. The Lower Carson River is overpopulated...

  20. Integrated Pest Management Plan : Kulm Wetland Management District 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  1. Volume visualization in radiation treatment planning.

    Science.gov (United States)

    Pelizzari, C A; Chen, G T

    2000-12-01

    Radiation treatment planning (RTP), historically an image-intensive discipline and one of the first areas in which 3D information from imaging was clinically applied, has become even more critically dependent on accurate 3D definition of target and non-target structures in recent years with the advent of conformal radiation therapy. In addition to the interactive display of wireframe or shaded surface models of anatomic objects, proposed radiation beams, beam modifying devices, and calculated dose distributions, recently significant use has been made of direct visualization of relevant anatomy from image data. Dedicated systems are commercially available for the purpose of geometrically optimizing beam placement, implementing in virtual reality the functionality of standard radiation therapy simulators. Such "CT simulation" systems rely heavily on 3D visualization and on reprojection of image data to produce simulated radiographs for comparison with either diagnostic-quality radiographs made on a simulator or megavoltage images made using the therapeutic beams themselves. Although calculation and analysis of dose distributions is an important component of radiation treatment design, geometric targeting with optimization based on 3D anatomic information is frequently performed as a separate step independent of dose calculations.

  2. Breckinridge Project, initial effort. Report VI. Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  3. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  4. Defense Depot Tracy Total Quality Management Plan

    Science.gov (United States)

    1989-07-01

    PAGES TQM ( Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  5. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  6. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  7. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite States...

  8. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  9. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  10. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  11. Fishery Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Tamarac NWR provides an inventory of fishery resources on the Refuge including a description of the water area and fish sampling...

  12. Fishery management plan: Yazoo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Yazoo National Wildlife Refuge. Data was provided by the Refuge and Area Office Wildlife...

  13. Merced National Wildlife Refuge water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The details of this plan are separated into ten sections: Background, Water Management Related Goals and Objectives, Policies and Procedures, Inventory and Existing...

  14. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  15. Gulf of Maine Tern Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following management plan provides an outline of the tasks proposed to restore tern numbers to levels approximating those reached during the last period of...

  16. Meredosia National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Meredosia National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at...

  17. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  18. Cropland Management Plan: Louisa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Louisa National Wildlife Refuge Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at...

  19. 1991-92 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge – McGregor District Water Management Plan has been developed to meet the station objectives set forth...

  20. Cropland Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  1. Crop Management Plan: Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sherburne NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  2. Agassiz National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  3. Cropland Management Plan: Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  4. Fishery Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of the Mingo NWR Fishery Management Plan are to maintain and improve the quality of aquatic habitats for a well-balanced community of fish and other...

  5. Fire Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Finding of No Significant Impact (FONSI) and the Environmental Assessment (EA) for the Ottawa NWR Fire Management Plan. A description of...

  6. Yukon Flats cooperative moose management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Moose management plan designed to promote an increase in the moose populations in the following ways. Improve moose harvest reporting to better document subsistence...

  7. Cropland Management Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Dahomey NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  8. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  9. Fishery management plan for the Dorris reservoir

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for Dorris Reservoir at Modoc National Wildlife Refuge. The U.S. Fish and Wildlife service proposes to continue a public fishing program...

  10. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  11. Agassiz National Wildlife Refuge : Safety Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of this Safety Management Plan are to identify and define safety hazards that may be encountered on Agassiz Refuge and the procedures to be followed...

  12. Draft of the PHENIX Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  13. Sustainable forest management planning in Serbia

    Directory of Open Access Journals (Sweden)

    Medarević Milan

    2014-01-01

    Full Text Available The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200 years (The Plan of Deliblato Sands Afforestation 1806. There are two basic assumptions that define forest management planning: sustainability and multifunctionality. Today, forest management planning in Serbia is regulated by the Law on forests and it has the characteristics of a system. The planning also has the characteristics of an integral, integrated and adaptive system. The latter is particularly important in terms of pronounced climatic changes. For the forests in protected objects of nature, there are also other types of plans that complement sector plans in forestry (e.g. management plans in protected areas.

  14. Forest Management Plan, ERDA Oak Ridge Reservation: 1976--1980

    Energy Technology Data Exchange (ETDEWEB)

    Bradburn, D. M.

    1977-06-01

    The ERDA Oak Ridge Reservation Forest Management Plan is utilized as a guide in the managing and administering of the natural resources of the forest. A revised management plan summarizes the goals and accomplishment of the previous plan while recommending necessary improvements and alternatives for the ensuing management cycle. The management plan contains programmatic assessments of silvicultural activities and their environmental impacts.

  15. Planning and managing the physician workforce.

    Science.gov (United States)

    Schoenbaum, Stephen C

    2012-03-12

    National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries.This is a commentary on http://www.ijhpr.org/content/1/1/13.

  16. Planning and managing the physician workforce

    Directory of Open Access Journals (Sweden)

    Schoenbaum Stephen C

    2012-03-01

    Full Text Available Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries. This is a commentary on http://www.ijhpr.org/content/1/1/13.

  17. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  18. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  19. Wilderness management plan : Farallon National Wildlife Refuge : Farallon Wilderness : Wilderness management plan [draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Farallon Wilderness. After introducing the area, it analyzes current management practices against current public...

  20. Productivity enhancement planning using participative management concepts

    Science.gov (United States)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  1. Management of behavioral health provider networks in private health plans.

    Science.gov (United States)

    Garnick, Deborah W; Horgan, Constance M; Reif, Sharon; Merrick, Elizabeth L; Hodgkin, Dominic

    2008-01-01

    We explored the techniques used by private health plans or by their contracted managed behavioral healthcare organizations (MBHOs) to maintain networks of behavioral health providers. In particular, we focused on differences by health plans' product types (health maintenance organization, point-of-service plan, or preferred provider organization) and contracting arrangements (MBHO contracts, comprehensive contracts, or no contracts). More than 94% of products selected providers using credentialing standards, particular specialists, or geographic coverage. To retain providers viewed as high quality, 54% offer reduced administrative burden and 44% higher fees. Only 16% reported steerage to a core group of highest-quality providers and few reported an annual bonus or guaranteed volume of referrals. Some standard activities are common, but some health plans are adopting other approaches to retain higher-quality providers.

  2. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  3. Test Plan Development for Plastic Ammunition Containers. Volume 1

    Science.gov (United States)

    1989-03-15

    122 xii TEST PLAN DEVELOPMENT FOR PLASTIC AM4MINITION CONTAINERS - VOLUME I 1.0 INTRODUCTION The purpose of this project...11 LA 00 Li C:0 z CP -0 133 0( LIE r r ’ D2 U)~ E C IP a g 0- L) LaLn 4’ MOIAIV3H-Q3.~f-trCYin, 20o Tabla 6-D Performance Prediction Model 155ram

  4. Stillwater Wildlife Management Area : Grasslands Management Plan : North Marsh Unit

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan is designed to serve as the initial Fish and Wildlife Service habitat management proposal for the North Marsh grazing unit of Stillwater National Wildlife...

  5. Total Quality Management Implementation Plan for Military Personnel Management

    Science.gov (United States)

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  6. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No. 68 / Monday, April 9, 2012... National Forest System Land Management Planning AGENCY: Forest Service, USDA. ACTION: Final rule and record... land management planning rule (planning rule). The new planning rule guides the development, amendment...

  7. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  8. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  9. Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

    Science.gov (United States)

    Sapp, T. P.; Davin, D. E.

    1977-01-01

    The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

  10. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  11. Myopia management: multihospital portfolio planning.

    Science.gov (United States)

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  12. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  13. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...-1104. FOR FURTHER INFORMATION CONTACT: Ecosystem Management Coordination staff's Planning Specialist... management plans (the planning rule). The National Forest Management Act (NFMA) at 16 U.S.C. 1604(g)(3)(D...

  14. Data Management and Preservation Planning for Big Science

    Directory of Open Access Journals (Sweden)

    Juan Bicarregui

    2013-06-01

    Full Text Available ‘Big Science’ - that is, science which involves large collaborations with dedicated facilities, and involving large data volumes and multinational investments – is often seen as different when it comes to data management and preservation planning. Big Science handles its data differently from other disciplines and has data management problems that are qualitatively different from other disciplines. In part, these differences arise from the quantities of data involved, but possibly more importantly from the cultural, organisational and technical distinctiveness of these academic cultures. Consequently, the data management systems are typically and rationally bespoke, but this means that the planning for data management and preservation (DMP must also be bespoke.These differences are such that ‘just read and implement the OAIS specification’ is reasonable Data Management and Preservation (DMP advice, but this bald prescription can and should be usefully supported by a methodological ‘toolkit’, including overviews, case-studies and costing models to provide guidance on developing best practice in DMP policy and infrastructure for these projects, as well as considering OAIS validation, audit and cost modelling.In this paper, we build on previous work with the LIGO collaboration to consider the role of DMP planning within these big science scenarios, and discuss how to apply current best practice. We discuss the result of the MaRDI-Gross project (Managing Research Data Infrastructures – Big Science, which has been developing a toolkit to provide guidelines on the application of best practice in DMP planning within big science projects. This is targeted primarily at projects’ engineering managers, but intending also to help funders collaborate on DMP plans which satisfy the requirements imposed on them.

  15. STORMWATER BEST MANAGEMENT PRACTICES DESIGN GUIDE VOLUME 2 - VEGETATIVE BIOFILTERS

    Science.gov (United States)

    This document is Volume 2 of a three volume document that provides guidance on the selection and design of stormwater management Best Management Practices (BMPs). This second volume provides specific design guidance for a group of onsite BMP control practices that are referred t...

  16. STORMWATER BEST MANAGEMENT PRACTICES DESIGN GUIDE VOLUME 2 - VEGETATIVE BIOFILTERS

    Science.gov (United States)

    This document is Volume 2 of a three volume document that provides guidance on the selection and design of stormwater management Best Management Practices (BMPs). This second volume provides specific design guidance for a group of onsite BMP control practices that are referred t...

  17. Double-O Habitat Management Plan: Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Double-0 Plan is a step-down plan of the 1985 Refuge Master Plan and Environmental Assessment. The purpose of this plan is to guide the management, protection,...

  18. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  19. Data Management Facility Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  20. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  1. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  2. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  3. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...) The functions to be exercised by the Indian Tribe pertain to the management and protection of...

  4. Using care plans to better manage multimorbidity

    Directory of Open Access Journals (Sweden)

    Mark AJ Morgan

    2015-09-01

    Full Text Available Background The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs, each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. Methods A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control from 11 Australian general practices in regional and metropolitan areas. Results Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. Conclusion The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  5. Using care plans to better manage multimorbidity.

    Science.gov (United States)

    Morgan, Mark Aj; Coates, Michael J; Dunbar, James A

    2015-01-01

    The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs), each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control) from 11 Australian general practices in regional and metropolitan areas. Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  6. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-11-01

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... States, Metropolitan Planning Organizations (MPO), and local governments that intend to initiate or continue Integrated Corridor Management (ICM) development with their partners, such as arterial management...

  7. Defense System Software Management Plan

    Science.gov (United States)

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  8. Hanford site integrated pest management plan

    Energy Technology Data Exchange (ETDEWEB)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  9. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth.......The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... 1970 until 1977. The reforms established an integrated planning system aiming to achieve spatial coordination through a hierarchy of plans occurring at multiple scales and a certain degree of horizontal and vertical integration of policies across sectors and jurisdictions. Since then, Denmark has been...

  10. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  11. Grasslands Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of this Grassland Management Plan for Tamarac NWR is to provide a variety of quality grasslands, by the year 1999 totaling 2,500 acres and eventually 5,000...

  12. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  13. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  14. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  15. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  16. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  17. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization......The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  18. Comprehensive Conservation Plan: Huron Wetland Management District, Madison Wetland Management District, Sand Lake Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Huron Wetland Management District, Madison Wetland Management District, and Sand Lake...

  19. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  20. Sodium fast reactor safety and licensing research plan. Volume II.

    Energy Technology Data Exchange (ETDEWEB)

    Ludewig, H. (Brokhaven National Laboratory, Upton, NY); Powers, D. A.; Hewson, John C.; LaChance, Jeffrey L.; Wright, A. (Argonne National Laboratory, Argonne, IL); Phillips, J.; Zeyen, R. (Institute for Energy Petten, Saint-Paul-lez-Durance, France); Clement, B. (IRSN/DPAM.SEMIC Bt 702, Saint-Paul-lez-Durance, France); Garner, Frank (Radiation Effects Consulting, Richland, WA); Walters, Leon (Advanced Reactor Concepts, Los Alamos, NM); Wright, Steve; Ott, Larry J. (Oak Ridge National Laboratory, Oak Ridge, TN); Suo-Anttila, Ahti Jorma; Denning, Richard (Ohio State University, Columbus, OH); Ohshima, Hiroyuki (Japan Atomic Energy Agency, Ibaraki, Japan); Ohno, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Miyhara, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Yacout, Abdellatif (Argonne National Laboratory, Argonne, IL); Farmer, M. (Argonne National Laboratory, Argonne, IL); Wade, D. (Argonne National Laboratory, Argonne, IL); Grandy, C. (Argonne National Laboratory, Argonne, IL); Schmidt, R.; Cahalen, J. (Argonne National Laboratory, Argonne, IL); Olivier, Tara Jean; Budnitz, R. (Lawrence Berkeley National Laboratory, Berkeley, CA); Tobita, Yoshiharu (Japan Atomic Energy Agency, Ibaraki, Japan); Serre, Frederic (Centre d' %C3%94etudes nucl%C3%94eaires de Cadarache, Cea, France); Natesan, Ken (Argonne National Laboratory, Argonne, IL); Carbajo, Juan J. (Oak Ridge National Laboratory, Oak Ridge, TN); Jeong, Hae-Yong (Korea Atomic Energy Research Institute, Daejeon, Korea); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Corradini, Michael (University of Wisconsin-Madison, Madison, WI); Thomas, Justin (Argonne National Laboratory, Argonne, IL); Wei, Tom (Argonne National Laboratory, Argonne, IL); Sofu, Tanju (Argonne National Laboratory, Argonne, IL); Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN); Bari, R. (Brokhaven National Laboratory, Upton, NY); Porter D. (Idaho National Laboratory, Idaho Falls, ID); Lambert, J. (Argonne National Laboratory, Argonne, IL); Hayes, S. (Idaho National Laboratory, Idaho Falls, ID); Sackett, J. (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.

    2012-05-01

    Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

  1. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  2. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  3. Volume reduction philosophy and techniques in use or planned

    Energy Technology Data Exchange (ETDEWEB)

    Row, T.H.

    1984-01-01

    Siting and development of nuclear waste disposal facilities is an expensive task. In the private sector, such developments face siting and licensing issues, public intervention, and technology challenges. The United States Department of Energy (DOE) faces similar challenges in the management of waste generated by the research and production facilities. Volume reduction can be used to lengthen the service life of existing facilities. A wide variety of volume reduction techniques are applied to different waste forms. Compressible waste is compacted into drums, cardboard and metal boxes, and the loaded drums are supercompacted into smaller units. Large metallic items are size-reduced and melted for recycle or sent to shallow land burial. Anaerobic digestion is a process that can reduce cellulosic and animal wastes by 80%. Incinerators of all types have been investigated for application to nuclear wastes and a number of installations operate or are constructing units for low-level and transuranic solid and liquid combustibles. Technology may help solve many of the problems in volume reduction, but the human element also has an important part in solving the puzzle. Aggressive educational campaigns at two sites have proved very successful in reducing waste generation. This overview of volume reduction is intended to transfer the current information from many DOE facilities. 44 references, 85 figures, 5 tables.

  4. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... is up to two wavelengths, significant capacity savings are possible. Network planning in the form of optimal design of national and regional telecommunication networks is thoroughly studied and promising computer programs and methods are developed. In the optimization process are both duct, fiber......, and switch equipment cost considered. The contribution in network planning are one of the most important contributions with direct usability....

  5. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  6. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  7. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  8. Des Lacs National Wildlife Refuge Water Management Plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  9. Water Management Plan 1949 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  10. Pocosin Lakes National Wildlife Refuge : 2006 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  11. Pocosin Lakes National Wildlife Refuge : 2009 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2009 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  12. Des Lacs National Wildlife Refuge Water Management Plan 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  13. Water Management Plan 1950 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  14. Water Management Plan Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  15. Des Lacs National Wildlife Refuge Water Management Plan 1961

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  16. Des Lacs National Wildlife Refuge Water Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  17. Pocosin Lakes National Wildlife Refuge : 2004 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  18. Strategic plan for Hanford site information management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  19. Yukon Flats National Wildlife Refuge Fishery. Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Yukon Flats National Wildlife Refuge Fishery Management Plan (Fishery Plan) provides comprehensive management direction to insure that fish species and habitats...

  20. Windom Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Windom Wetland Management District for the next 15 years. This plan outlines the...

  1. Forest Management Plan : Upper Mississippi River Wildlife & Fish Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi National Wildlife and Fish Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest...

  2. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  3. Grassland Management Plan: Union Slough National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The plan outlines grassland habitat management objectives for Union Slough National Wildilfe Refuge. The Grassland Management Plan objectives include; preserve...

  4. Comprehensive Conservation Plan: North Dakota Wetland Management Districts

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on North Dakota Wetland Management Districts for the next 15 years. This plan outlines the...

  5. Iowa Wetland Management District: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Iowa Wetland Management District for the next 15 years. This plan outlines the Refuge...

  6. Comprehensive hatchery management plan: Carson National Fish Hatchery

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Hatchery Management Plan (CHMP) for the Carson National Fish Hatchery (NFH) is an operational management plan which outlines policy, legal...

  7. Crab Orchard National Wildlife Refuge : Wilderness Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Wilderness Management Plan is a general plan which outlines the Refuge management objectives, wilderness creation and...

  8. Ottawa National Wildlife Refuge : Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Ottawa NWR Integrated Pest Management plan (IPM) is to provide a plan and a tool for adaptive management of invasive species on the Refuge. The...

  9. St. Croix Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on St. Croix Wetland Management District for the next 15 years. This plan outlines the...

  10. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  11. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  12. Trusted Computing Exemplar: Life Cycle Management Plan

    Science.gov (United States)

    2014-12-12

    Informal “An informal specification is written as prose in natural language...(e.g., Dutch, English, French, German). An informal specification is not...informal) prose . The restricted syntax language may be a natural language with restricted sentence structure and keywords with special meaning, or it may...accompanied by supporting explanatory (informal) prose .” [4] TCX: Life Cycle Management Plan NPS-CAG-14-002 4 2 Life Cycle Phases and Activities

  13. Remote sensing for land management and planning

    Science.gov (United States)

    Woodcock, Curtis E.; Strahler, Alan H.; Franklin, Janet

    1983-05-01

    The primary role of remote sensing in land management and planning has been to provide information concerning the physical characteristics of the land which influence the management of individual land parcels or the allocation of lands to various uses These physical characteristics have typically been assessed through aerial photography, which is used to develop resource maps and to monitor changing environmental conditions These uses are well developed and currently well integrated into the planning infrastructure at local, state, and federal levels in the United States. Many newly emerging uses of remote sensing involve digital images which are collected, stored, and processed automatically by electromechanical scanning devices and electronic computers Some scanning devices operate from aircraft or spacecraft to scan ground scenes directly; others scan conventional aerial transparencies to yield digital images. Digital imagery offers the potential for computer-based automated map production, a process that can significantly increase the amount and timeliness of information available to land managers and planners. Future uses of remote sensing in land planning and management will involve geographic information systems, which store resource information in a geocoded format. Geographic information systems allow the automated integration of disparate types of resource data through various types of spatial models so that with accompanying sample ground data, information in the form of thematic maps and/ or aerially aggregated statistics can be produced Key issues confronting the development and integration of geographic information systems into planning pathways are restoration and rectification of digital images, automated techniques for combining both quantitative and qualitative types of data in information-extracting procedures, and the compatibility of alternative data storage modes

  14. Residual limb volume change: Systematic review of measurement and management

    Directory of Open Access Journals (Sweden)

    Joan E. Sanders, PhD

    2011-10-01

    Full Text Available Management of residual limb volume affects decisions regarding timing of fit of the first prosthesis, when a new prosthetic socket is needed, design of a prosthetic socket, and prescription of accommodation strategies for daily volume fluctuations. This systematic review assesses what is known about measurement and management of residual limb volume change in persons with lower-limb amputation. Publications that met inclusion criteria were grouped into three categories: group I: descriptions of residual limb volume measurement techniques; group II: studies investigating the effect of residual limb volume change on clinical care in people with lower-limb amputation; and group III: studies of residual limb volume management techniques or descriptions of techniques for accommodating or controlling residual limb volume. We found that many techniques for the measurement of residual limb volume have been described but clinical use is limited largely because current techniques lack adequate resolution and in-socket measurement capability. Overall, limited evidence exists regarding the management of residual limb volume, and the evidence available focuses primarily on adults with transtibial amputation in the early postoperative phase. While we can draw some insights from the available research about residual limb volume measurement and management, further research is required.

  15. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  16. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  17. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  18. Management strategies in hospitals: scenario planning

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  19. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. Before grant assistance can be awarded for any treatment works project, the Regional Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  20. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2012-07-27

    ... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning; Correction...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012..., Subpart A--National Forest System Land Management Planning (36 CFR part 219, subpart A). One technical...

  1. 78 FR 13316 - National Forest System Land Management Planning Directives

    Science.gov (United States)

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... CONTACT: Annie Eberhart Goode, Planning Specialist, Ecosystem Management Coordination Staff, 202-205-1056...

  2. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. (a) From funds reserved under § 35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to: (1...

  3. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  4. 7 CFR 225.4 - Program management and administration plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Program management and administration plan. 225.4... Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year, each State agency shall submit to FNSRO a Program management and administration plan for that...

  5. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  6. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  7. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  8. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  9. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  10. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  11. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  12. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  13. Hanford site ground water protection management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  14. A measurement of the effectiveness and efficiency of pre-disaster debris management plans.

    Science.gov (United States)

    Crowley, Julia

    2017-04-01

    Disaster debris management operations make up a significant portion of recovery expenses. The following study aims to examine how the presence of a plan makes disaster debris management effective and efficient. Ninety-five counties in the United States who received major disaster declarations between 2012 and 2015 were surveyed to examine the quality of their debris management processes. Forty-nine of these counties had debris management plans while forty-six did not. Statistical tests were conducted to address discrepancies in the effectiveness and efficiency of the debris management processes between the two groups. Such tests suggest that counties with pre-disaster debris management plans were more effective. These counties recycled almost twice as much disaster debris as counties without plans, and received over three times as much Public Assistance from the Federal Emergency Management Agency (FEMA). Counties with plans also reported higher levels of perceived preparedness for future debris challenges than counties without plans. Overall, counties with pre-disaster debris management plans were partially more efficient than counties without plans. They removed more cubic yards of debris per day, but there were no statistically significant differences between the two groups in the volume of debris removed per dollar. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... management planning for Indian forest land shall be carried out through participation in the development and...

  16. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  17. 31 CFR 206.6 - Cash management planning and review.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review... planning and review. (a) An agency shall periodically perform cash management reviews to identify areas...) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL AGENCY...

  18. Texas Chenier Plain Refuge Complex: Final Environmental Impact Statement, Comprehensive Conservation Plan, and Land Protection Plan (Volumes 1 and 2)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Texas Chenier Plains Refuge Complex for the next 15 years. This plan outlines the...

  19. PLANNING AND MANAGING VIRTUALIZED NEXT GENERATION NETWORKS

    Directory of Open Access Journals (Sweden)

    Sukant K. Mohapatra

    2015-11-01

    Full Text Available Service convergence, content digitization, rapid and flexible service delivery, reduction of capital and operating costs, economies of scale, changes in telecom policy and regulation, and ever increasing competition have been key factors in the evolution of virtualized Next Generation Networks (vNGN. IPcentric converged networks aim to provide a multitude of services over a single network infrastructure. Tremendous success and benefit of server virtualization in data centers is driving the adaption of network virtualization. Network virtualization is applicable to enterprise data center, and enterprise as well as wide area networks. The focus of this paper is network virtualization aspects of service providers’ next generation network. The key factors for moving to virtualized network is optimal use and sharing of network infrastructure even among competitive service providers, programmability of network and rapid introduction of new service and standard based on open platform rather than proprietary implementation. Evolving Software Defined Network (SDN and Network Function Virtualization (NFV shall enable common network infrastructure sharing, control, and management at a higher layer thus making network devices more generic and less intelligent, thus enabling cost competitiveness and quick service delivery. Network virtualization shall enable key benefits such as lower cost, flexibility, efficiency, and security, However, the deployment of virtualized next generation networks has brought its unique challenges for network managers and planners, as the network has to be planned in a comprehensive way with effective management of virtual network elements, its correlation with physical infrastructure and monitoring of control functions and server platforms. This paper discusses generic next generation network, its virtualization, and addresses the challenges related to the planning and managing of virtualized next generation networks. This

  20. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  1. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  2. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  3. Volume II: Ecosystem management: principles and applications.

    Science.gov (United States)

    M.E. Jensen; P.S. Bourgeron

    1994-01-01

    This document provides land managers with practical suggestions for implementing ecosystem management. It contains 28 papers organized into five sections: historical perspectives, ecological principles, sampling design, case studies, and implementation strategies.

  4. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  5. Habitat Management Plan - Clarks River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Habitat Management Plans (HMPs) are dynamic working documents that provide refuge managers a decision-making process; guidance for the management of the refuge’s...

  6. Furbearer Management Plan : Big Stone National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Stone NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  7. Bombay Hook National Wildlife Refuge Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  8. Marsh and Water Management Plan : Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The marsh and water management plan outlines and describes management strategies for maintenance, rehabilitation, and development of managed waters on the Clarence...

  9. Fur Management Plan: Mark Twain National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  10. Long Term Fur Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  11. Crab Orchard National Wildlife Refuge : Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  12. Station Management Plan Long Island National Wildlife Refuge Complex 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan provides the Refuge Manager with three to five year guidance for managing eight National Wildlife Refuges located on Long Island, New...

  13. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  14. 1995 Annual Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1995 Water Management Plan for Muscatatuck NWR begins by summarizing the 1994 Water Management Program. Management results for moist soil units, green tree...

  15. Benton Lake National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Benton Lake NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  16. Mixed Waste Focus Area program management plan

    Energy Technology Data Exchange (ETDEWEB)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  17. Injury risk management plan for volleyball athletes.

    Science.gov (United States)

    James, Lachlan P; Kelly, Vincent G; Beckman, Emma M

    2014-09-01

    Volleyball is an increasingly popular team sport. As with any competitive sport, there is an inherent risk of injury that must be recognized and collaboratively managed. This article provides a practical approach to the management of volleyball injuries within a team or organization. A brief review of the epidemiological data is presented which establishes (i) ankle sprain, (ii) shoulder overuse injury, (iii) patella tendinopathy, and (iv) anterior cruciate ligament injury as the primary injuries to address amongst these athletes. The interaction of modifiable and non-modifiable risk factors for these injuries are used to classify athletes into high-, medium- and low-risk groups. Targeted training interventions are suggested, based upon the risk level of the athlete, to minimize the occurrence of these injuries. Practical methods for integrating these activities into a training plan are also discussed.

  18. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans...

  19. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  20. Environmental planning and management in Greater Johannesburg.

    Science.gov (United States)

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  1. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  2. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental asses...... in their SEAs of RBMPs is weak. In this paper the connections between climate change and water are reviewed. As a result, it is suggested that climate change needs to be considered in three ways: mitigation, adaptation and baseline adaptation. Udgivelsesdato: December......In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  3. HotSpot Software Configuration Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  4. Integrated safety management system verification: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  5. Integrated safety management system verification: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  6. Integrated safety management system verification: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, R.F.

    1998-08-10

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

  7. Editorial - International Journal of Sustainable Energy Planning and Management Vol 8

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2015-06-01

    Full Text Available This editorial introduces the eight volume of the International Journal of Sustainable Energy Planning and Management. The volume addresses economically optimal biogas facilities based on spatial analyses in the United States, and analyses of the role of municipalities in expanding biogas in Denmark. A large review article looks into community renewable energy networks, and finally support schemes for renewable energy production are analysed with cases from Denmark and South Africa.

  8. Draft Pacific Flyway management plan for the emperor goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to update previous versions of this plan (Pacific Flyway Council 1988) and reemphasize established goals and strategies for management of...

  9. Mark Twain National Wildlife Refuge : Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  10. Fisheries Management Plan Cameron Prairie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the fisheries management plan for the refuge. This plan develops strategies and tasks for maintaining a viable fishery for Unit 8. There are other areas...

  11. Wildland Fire Management Plan: Great River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan (FMP) for the Great River National Wildlife Refuge and for purposes of this plan includes Clarence Cannon National...

  12. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  13. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  14. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  15. Pacific Flyway management plan for the dusky Canada goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan for the dusky Canada goose (Branta canadensis occidentalis) is a revision of earlier plans adopted by the Pacific Flyway Council (1973, 1985,...

  16. Station Management Plan Mason Neck National Wildlife Refuge 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In March 1992, a planning team met to identify issues, set objectives and develop strategies for management of the three refuges. The information from the planning...

  17. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  18. Bear River Migratory Bird Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Bear River Migratory Bird Refuge for the next 15 years. This plan outlines the Refuge...

  19. Fishery management plan: Morgan Brake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines goals and objectives recommended by the Service Fisheries Assistance program. The plan is to be used as a guide in managing the Refuge's fishery...

  20. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  1. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and formulating the ... determine the planning perspective and problems approach in order to determine bottlenecks respectively. .... Goibar, Sari, Neka, Behshhr and Galogah cities.

  2. Marsh and Water Management Plan: Back Bay National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Marsh and Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of...

  3. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  4. Water Management Plan: Savannah National Wildlife Refuge Calendar Year 1962

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water Management Plan for Savannah NWR for calendar year 1962. This plan includes brief habitat descriptions and specific actions for Pools 2-7A, as well as...

  5. Umatilla National Wildlife Refuge: Comprehensive Conservation Plan Management Direction

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Umatilla NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  6. Rocky Mountain Arsenal 5 year fish and wildlife management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This five year management plan for Rocky Mountain Arsenal National Wildlife Refuge (RMA) was developed as a dynamic planning aid to guide and prioritize annual and...

  7. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  8. Water Management Plan: Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  9. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  10. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    Science.gov (United States)

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM ( Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  11. Data Science in Supply Chain Management: Data-Related Influences on Demand Planning

    Science.gov (United States)

    Jin, Yao

    2013-01-01

    Data-driven decisions have become an important aspect of supply chain management. Demand planners are tasked with analyzing volumes of data that are being collected at a torrential pace from myriad sources in order to translate them into actionable business intelligence. In particular, demand volatilities and planning are vital for effective and…

  12. Data Science in Supply Chain Management: Data-Related Influences on Demand Planning

    Science.gov (United States)

    Jin, Yao

    2013-01-01

    Data-driven decisions have become an important aspect of supply chain management. Demand planners are tasked with analyzing volumes of data that are being collected at a torrential pace from myriad sources in order to translate them into actionable business intelligence. In particular, demand volatilities and planning are vital for effective and…

  13. Turn over folders: a proven tool in succession management planning.

    Science.gov (United States)

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  14. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  15. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  16. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  17. Total Quality Management Office for Contracting Integrity Implementation Plan

    Science.gov (United States)

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  18. Developing a Sand Management Plan for Galveston Island

    Science.gov (United States)

    2015-10-16

    US Army Corps of Engineers BUILDING STRONG® Developing a Sand Management Plan for Galveston Island Ashley E. Frey, P. E. Research Civil...GenCade Alternatives • Sand Management Alternatives and Plan • Beach Nourishment Project 2 Innovative solutions for a safer, better world...BUILDING STRONG® Problem Statement/Approach Recommend a long-term plan of actions to better manage sands on Galveston Island Initial Tasks

  19. Neutralized current acid waste consolidation management plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Brown, R.G.; Galbraith, J.; Jensen, C.; Place, D.E.; Reddick, G.W.; Zuroff, W. [Westinghouse Hanford Co., Richland, WA (United States); Brothers, A.J. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-01-01

    The scope of this evaluation is to recommend a management plan for the high-heat tank waste, including neutralized current acid waste (NCAW) in AY and AZ Tank Farms, and tank C-106 waste. The movement of solids, liquids and salt cake in the designated tank farms is included. Decision analysis techniques were used to determine a recommended alternative. The recommended course of action was replacement of a 75-hp mixer pump in tank AY-102 and in-tank concentration of tank AZ-102 supernate. The alternative includes transfer fo tank C-106 sludge to tank AY-102, then transfer to tank AY-102 and tank C-106 sludge to tank AZ-101 using the new 75-hp mixer pump installed in tank AY-102. Tank AZ-101 becomes a storage tank for high-level waste (HLW) sludge, with the capacity to mix and transfer sludge as desired.

  20. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    Science.gov (United States)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  1. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  2. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  3. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  4. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  5. A groundwater management plan for Stuttgart.

    Science.gov (United States)

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  6. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained

  7. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained prominenc

  8. KNOWLEDGE MANAGEMENT AND ENTERPRISE RESOURCE PLANNING IMPLEMENTATION: A CONCEPTUAL MODEL

    Directory of Open Access Journals (Sweden)

    Sevenpri Candra

    2014-01-01

    Full Text Available The purpose of this research is examining the influence of organizational learning and knowledge management in enterprise resource planning implementation. This study is based on organizational learning, knowledge management and enterprise resource planning implementation. This research did not test all organizational factors and focus particularly on knowledge management capacity and absorptive capability. Enterprise resource planning implementation successful is a must. In today’s global and competitor in business, enterprise resource planning is becoming one of the main tools to achieve competitiveness in business. Enterprise resource planning is an infrastructure to create and maintain business to improve front-office and back-office efficiency and effectiveness. This study is significant to bring new thinking in determines the key antecedents to successful enterprise resource planning implementation based on knowledge management perspectives and it will helps to understand the key success factor in enterprise resource planning implementation.

  9. Editorial - International Journal of Sustainable Energy Planning and Management Vol 4

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2014-06-01

    Full Text Available This editorial introduces the fourth volume of the International Journal of Sustainable Energy Planning and Management. Topics include mean-variance approach of energy systems design, the role of heat savings in smart energy systems, analyses of the German secondary reserve market, options for replacing lignite-fired district heating in plants in Greece with biomass-fired district heating plants based on boilers or cogeneration of heat and power. Topics also include how local Norwegian governments engage in local energy planning and how they differ in approach. Finally, this volume addresses characterisation of the building stock with a view to assessing savings potentials with a case from Belgium.

  10. Handy Brake National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Handy Brake National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  11. Forest Management Plan Blackwater National Wildlife Refuge 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan will be geared mainly toward habitat management of refuge woodlands to benefit and/or protect the endangered Bald Eagle and the Delmarva...

  12. Refuge Management Plan, Part III : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR provides an overview of the Management Program. Outputs include endangered species maintenance, waterfowl production, waterfowl...

  13. Management Plan Parts I and II : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR summarizes the refuge objectives, history, resources, land status, and administration of the Refuge. Objectives and management...

  14. Habitat Management Plan Squaw Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  15. Habitat Management Plan for Bogue Chitto National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bogue Chitto NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bogue Chitto NWR,...

  16. Integrated Pest Management Plan for Sand Lake NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Sand Lake WMD. The...

  17. Grassland Management Plan Erie National Wildlife Refuge 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan provides well defined guidelines to accomplish the following goals at Erie National Wildlife Refuge : 1) to manage existing grasslands, 2)...

  18. Bombay Hook National Wildlife Refuge Cropland Management Plan 1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  19. Bombay Hook National Wildlife Refuge Cropland Management Plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  20. Bombay Hook National Wildlife Refuge Cropland Management Plan 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  1. A Timber Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for Mingo National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. A history and...

  2. Pocosin Lakes National Wildlife Refuge : 2002 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2002 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  3. Pocosin Lakes National Wildlife Refuge : 2003 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2003 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  4. Great River & Clarence Cannon National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Great River and Clarence Cannon NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  5. Habitat Management Plan for Logan Cave National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Logan Cave NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Logan Cave NWR, to...

  6. Habitat Management Plan for Tensas River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tensas River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tensas River NWR,...

  7. Habitat Management Plan for St. Marks National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The St. Marks NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at St. Marks NWR, to...

  8. Fire Managment Plan Presquile National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan for Presquile National Wildlife Refuge. It relates to existing land management policy, however, comprehensive...

  9. Forest Management Plan for Bayou Cocodrie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Cocodrie NWR Forest Management Plan provides a long-term vision and specific guidance on managing forest habitat for the resources of concern at Bayou...

  10. Arrowwood National Wildlife Refuge Complex Integrated Pest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arrowwood NWRC. The...

  11. Integrated Pest Management Plan Ouray National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Ouray NWR. The goals...

  12. Arapaho National Wildlife Refuge Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arapaho National...

  13. Louisa District Mark Twain NWR : Grassland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain National Wildlife Refuge- Louisa District Grassland Management Plan addresses management strategies to provide habitat and food for waterfowl and...

  14. Rocky Mountain Arsenal National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Habitat Management Plan identifies important wildlife resources on the Rocky Mountain Arsenal National Wildlife Refuge and the management strategies that will...

  15. Prime Hook National Wildlife Refuge Fire Management Plan 2002

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Department of the Interior fire management policy requires that all national wildlife refuges with vegetation that can sustain fire have a Fire Management Plan...

  16. Big Branch Marsh National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Branch National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  17. Mountain Longleaf National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mountain Longleaf National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  18. Merritt Island National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  19. Cape May National Wildlife Refuge Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan for Cape May National Wildlife Refuge provides the Refuge Manager with one to three year guidance for 1) acquiring or otherwise...

  20. Cameron Prairie National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cameron Prairie National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  1. Integrated Pest Management Plan Browns Park National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Browns Park National...

  2. Habitat Management Plan for Atchafalaya National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Atchafalaya NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Atchafalaya NWR,...

  3. Habitat Management Plan for Roanoke River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Roanoke River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Roanoke River...

  4. Habitat Management Plan for Lake Ophelia National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lake Ophelia NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Lake Ophelia NWR,...

  5. Habitat Management Plan for Delta and Breton National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Delta and Breton NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Delta and...

  6. Modoc National Wildlife Refuge annual water management plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1980, recommended water management for 1981, and...

  7. Modoc National Wildlife Refuge annual water management plan 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1981, recommended water management for 1982, and...

  8. Management Plan : Parts I & II : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parts I and II of the Management Plan for Tamarac NWR summarize the location, history, environment, resources, administration, land status, and current management...

  9. Pocosin Lakes National Wildlife Refuge : 2006 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  10. Pocosin Lakes National Wildlife Refuge : 2004 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  11. Pocosin Lakes National Wildlife Refuge : 2000 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2000 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  12. Pocosin Lakes National Wildlife Refuge : 2001 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2001 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  13. Pocosin Lakes National Wildlife Refuge : 1999 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1999 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  14. Moose/Habitat Management Plan : [Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kenai NWR Moose/Habitat Management Plan was developed to guide future FWS management of moose/habitat on Kenai NWR. The present status and trend of Kenai NWR...

  15. Grassland Management Plan Wertheim National Wildlife Refuge 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan for Wertheim National Wildlife Refuge is presented as an interim document to provide refuge staff in 1989 with management guidelines...

  16. Habitat Management Plan for Black Bayou Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Black Bayou Lake NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Black Bayou...

  17. Habitat Management Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pee Dee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Pee Dee NWR, to...

  18. Habitat Management Plan for Tennessee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tennessee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tennessee NWR, to...

  19. Habitat Management Plan for Bayou Cocodrie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Cocodrie NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Cocodrie...

  20. Rocky Mountain Arsenal National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  1. Habitat Management Plan for Carolina Sandhills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Carolina Sandhills NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Carolina...

  2. Aquatic management plan : [Rocky Mountain Arsenal National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The aquatic management plan for Rocky Mountain Arsenal National Wildlife Refuge (Refuge) provides management direction and guidance to ensure the conservation of...

  3. Integrated Pest Management Plan Medicine Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Medicine Lake NWR. The...

  4. Integrated Pest Management Plan - Fish Springs National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Fish Springs NWR. The...

  5. Fishery Management Plan Kenai National Wildlife Refuge FY 1996 - 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for the Kenai National Wildlife Refuge for the Kenai National Wildlife Refuge provides management direction necessary to ensure...

  6. Panther Swamp National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Panther Swamp National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  7. Fort Niobrara National Wildlife Refuge River Recreation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Fort Niobrara National Wildlife Refuge River Recreation Management Plan is to provide guidance and direction for management of recreational...

  8. Two Ponds National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  9. Habitat Management Plan for Pond Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pond Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  10. Occoquan Bay National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Occoquan Bay National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  11. Habitat Management Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pee Dee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Pee Dee NWR, to...

  12. Bayou Sauvage National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Sauvage NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage...

  13. Habitat Management Plan : Audubon National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Audubon National Wildlife Refuge Complex Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  14. Pocosin Lakes National Wildlife Refuge : 2005 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2005 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  15. Two Rivers National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Two Rivers National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  16. Bon Secour National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bon Secour National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  17. Fishery Management Plan : Ottawa National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Ottawa NWR provides an overview of the relationship between fishery management and Refuge objectives. Wildlife use and production...

  18. Moist Soil Management Plan : Hatchie National Wildlife Refuge : 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This moist soil management plan for Hatchie National Wildlife Refuge covers the 1982 management and manipulation of seasonally flooded wetlands to produce a mudflat...

  19. [Draft] Fishery Management Plan : Valentine National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fishery management plan for Valentine National Wildlife Refuge has objectives and strategies for fish management that are in agreement with the background and...

  20. Wilderness management plan : Monomoy National Wildlife Refuge : Monomoy Wilderness

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Monomoy Wilderness. After introducing the area, it analyzes current management practices against current public...

  1. Bayou Teche National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Teche NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage NWR,...

  2. Cypress Creek National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan (CMP) for Cypress Creek National Wildlife Refuge (NWR) was prepared to guide management direction of the Refuge over the next 15...

  3. Grand Cote National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Grand Cote NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  4. Red River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Red River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  5. Merritt Island National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  6. Agassiz National Wildlife Refuge : Marsh and Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Marsh and Water Management Plan (MWMP) is intended to guide the management of Agassiz NWR wetlands into the twenty-first century. The foundation on which this...

  7. Cahaba River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cahaba River National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  8. D'Arbonne National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The D'Arbonne National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  9. Upper Ouachita National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Ouachita National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  10. John Heinz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The John Heinz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  11. St. Vincent National Wildlife Refuge : Timber Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for St. Vincent National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. Two types...

  12. 77 FR 14568 - Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument...

    Science.gov (United States)

    2012-03-12

    ... analysis for this general management planning effort. SUPPLEMENTARY INFORMATION: This new GMP will update... planning process to date, the NPS planning team developed four preliminary alternatives for the management... National Park Service Environmental Impact Statement for Proposed General Management Plan,...

  13. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  14. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  15. Revised Comprehensive Conservation Plan and Environmental Impact Statement: Volumes 1 and 2- Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Revised Comprehensive Conservation Plan (Plan) and Environmental Impact Statement (EIS) for the Kenai National Wildlife Refuge will guide management of the...

  16. Planning and management of logistic cycle

    Directory of Open Access Journals (Sweden)

    V. N. Kudashkin

    2017-01-01

    Full Text Available We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as follows: method of system analysis, method of the theory of operations’ research, prognostics. Application of these methods allows forecasting material flows, creating the integrated management systems and controlling their movements, developing systems of logistic service, to optimize supply stock and solve a number of other tasks.A logistic approach to form a modern system of logistics will save time, reduce costs for the purchase of material resources, their delivery and storage.In modern conditions of the market economy, the considered time parameters of the logistic chain are essential for manufacturing enterprises because their records significantly increase the efficiency of the logistical system.Logistics is equipped with a special complex of economic and mathematical models, the main feature of which is the adaptability, i.e. ability to solve complex optimization problems in the operational mode and in the process of the management of material flows. The primary role of these models in a market economy is to identify quickly points of compromise.Dynamics to functional cycles gives the necessity to align resource needs «input» and «output». «Input» functional cycle is an order that specifies requirements for a product or service. Logistical system, which is able to complete fully the order of any size, as a rule, needs in the «combined» functional cycles, including different transactions and operations at different stages. The «output» of

  17. Sampling-based motion planning with reachable volumes: Theoretical foundations

    KAUST Repository

    McMahon, Troy

    2014-05-01

    © 2014 IEEE. We introduce a new concept, reachable volumes, that denotes the set of points that the end effector of a chain or linkage can reach. We show that the reachable volume of a chain is equivalent to the Minkowski sum of the reachable volumes of its links, and give an efficient method for computing reachable volumes. We present a method for generating configurations using reachable volumes that is applicable to various types of robots including open and closed chain robots, tree-like robots, and complex robots including both loops and branches. We also describe how to apply constraints (both on end effectors and internal joints) using reachable volumes. Unlike previous methods, reachable volumes work for spherical and prismatic joints as well as planar joints. Visualizations of reachable volumes can allow an operator to see what positions the robot can reach and can guide robot design. We present visualizations of reachable volumes for representative robots including closed chains and graspers as well as for examples with joint and end effector constraints.

  18. MANAGING HIGH-END, HIGH-VOLUME INNOVATIVE PRODUCTS

    Directory of Open Access Journals (Sweden)

    Gembong Baskoro

    2008-01-01

    Full Text Available This paper discuses the concept of managing high-end, high-volume innovative products. High-end, high-volume consumer products are products that have considerable influence to the way of life. Characteristic of High-end, high-volume consumer products are (1 short cycle time, (2 quick obsolete time, and (3 rapid price erosion. Beside the disadvantages that they are high risk for manufacturers, if manufacturers are able to understand precisely the consumer needs then they have the potential benefit or success to be the market leader. High innovation implies to high utilization of the user, therefore these products can influence indirectly to the way of people life. The objective of managing them is to achieve sustainability of the products development and innovation. This paper observes the behavior of these products in companies operated in high-end, high-volume consumer product.

  19. Collision Distance Detection Based on Swept Volume Strategy for Optimal Motion Plan

    Science.gov (United States)

    Huang, Tsai-Jeon

    A swept volume strategy to detect the collision distances between obstacles is presented in this paper for robot motion planning based on optimization technique. The strategy utilizes the recursive quadratic programming optimization method to perform the motion planning problem. This paper is based on segmental swept volume for convenient distance-to-contact calculation. Hermite interpolation is presented to approach the envelope bounding the swept volume. The new method is capable of handling a modestly non-convex swept volume and it has yielded accurate answers in distance calculations. Also, examples would be presented to illustrate and demonstrate this approach in the paper.

  20. Nurse manager succession planning: synthesis of the evidence.

    Science.gov (United States)

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  1. Succession planning for RNs: implementing a nurse management internship.

    Science.gov (United States)

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  2. A prospective study of OAR volume variations between two different treatment planning systems in radiotherapy

    Directory of Open Access Journals (Sweden)

    Bhudevi Soubhagya Kulkarni

    2015-09-01

    Full Text Available Purpose: It has been seen that there is a clinically significant variation in the volume calculated across different planning systems for the same digital imaging and communication (DICOM contours.The purpose of this study is to investigate the difference in volumes of organs at risk when the structure sets were exported from the Eclipse ((Palo Alto, USA Version 10.0 to XIO CMS (Electa, Crawley, UK Version 4.40.00 treatment planning system (TPS and identify how the differences occur. Methods: We prospectively analyzed the volumes of organs at risk from computerized tomography (CT data of 54 patients. Head and neck and brain tumors were taken for this study and contoured on Eclipse treatment planning system (TPS after importing images from CT. These contoured images were then exported using radiotherapy DICOM transfer facility to XIO CMS planning system and compared the contoured volumes with Eclipse TPS structured volumes. Results: Our analysis showed that the differences in calculated volumes of the contours for the patients between the two planning systems can be large. Mixed results are shown for different organs with the absolute volume difference ranging from -0.25 cc to 319.73 cc. These results clearly shown that the two TPS interprets the contours differently when calculating the volume, and there is a closer match with the theoretical calculated volumes with XIO CMS calculated volumes. Conclusion: Observed discrepancies were consistent between the two planning systems. This impact of contouring variability could play a role on plan quality metrics which is used as criteria for clinical trial protocol compliance.

  3. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  4. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  5. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  6. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  7. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth;

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  8. Issues of governance in water resource management and spatial planning

    NARCIS (Netherlands)

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial ma

  9. The consideration of emergency management issues in spatial planning practices

    NARCIS (Netherlands)

    Neuvel, J.M.M.; Brink, van den A.

    2010-01-01

    Spatial planning can play an important role in increasing the possibilities for emergency response. Nevertheless, little research has been done that explicitly looks at the way emergency management issues are addressed in predisaster spatial planning. We explore the consideration of emergency manage

  10. Uranium Mill Tailings Remedial Action Project surface project management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  11. Danish risk management plans of the EU Floods Directive

    DEFF Research Database (Denmark)

    Jebens, Martin; Sørensen, Carlo Sass; Piontkowitz, Thorsten

    2016-01-01

    We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed...... and cross-sectorial working platform for dealing with risks from floods....

  12. 40 CFR 262.214 - Laboratory management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  13. Planning among nurse managers in district hospitals in Ghana.

    Science.gov (United States)

    Asamani, James Avoka; Kwafo, Esther Oforiwaa; Ansah-Ofei, Adelaide Maria

    2013-12-01

    This article reports the results of a study that explored the planning practices of nurse managers at ward level, their knowledge of planning process and the factors that influence effective planning. Although the practice of planning was almost universal, half the participants had no knowledge of the process, and this knowledge gap was traced to a lack of educational preparation before their appointment. In-service training, support from management and staff, and funding were identified as major factors influencing effective planning at ward level. The authors recommend that prospective nurse managers have educational preparation before they take up these positions and nurse managers already in post have capacity-building training in planning.

  14. Future Communication, Computing, Control and Management Volume 1

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  15. Future Communication, Computing, Control and Management Volume 2

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  16. Future Computing, Communication, Control and Management Volume 2

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  17. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  18. TWRS systems engineering software configuration management plan

    Energy Technology Data Exchange (ETDEWEB)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  19. Croplands management plan: Wheeler National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan updates the agricultural portion of the Land Use Plan prepared and signed by C. M. Parker August 7, 1958 and revised March 3, 1959. A description of the...

  20. Program Planning Concepts in Solid Waste Management

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  1. Strategic Planning and Army Installation Management.

    Science.gov (United States)

    1996-01-01

    program. The U.S. Army has adopted the Malcolm Baldrige National Quality Award criteria for use in the ACOE program. Strategic planning is one of the...seven pillars of the Baldrige criteria. The Army has recognized that strategic planning is the key to the future. Strategic planning is the key to...and utilization of strategic planning . This paper examines through case study analysis several civilian communities and lessons learned through their

  2. EVOLUTION OF THE FOREST MANAGEMENT PHILOSOPHY IN TURKEY: A CASE STUDY OF ARTVIN PLANNING UNIT

    Directory of Open Access Journals (Sweden)

    Hacı Ahmet Yolasığmaz

    2006-04-01

    Full Text Available Forest management plans were firstly prepared and implemented in Turkey between 1963 and 1973. All forests in Turkey have been managed with timber oriented forest management philosophy; however, there have been some developments about inventory and silviculture techniques for approximately 40 years. Last decade, Turkey participated in Convention of Biological Diversity in Rio (1992 and included in both Pan – European and Near East Region Conventions. Nowadays, Turkish forest management philosophy has changed from timber management to ecosystem-based multiple-use forest planning with the principles of “sustainable forest management” criteria and indicators drafted in a few national and international agreements. Thus, Turkish forestry is underway in a restructuring process. This paper presents evolution of the traditional forest management philosophy in Turkey since 1963. This study was carried out in Artvin Planning Unit. Past two decade planning periods (managed under timber management approach was compared with current case study data used for forest multiple use management approach based on ecosystem in terms of distribution of age class, site class and change of volume and increment. In conclusion, former applications and techniques for adaptation of improvement must be analyzed and interpreted properly. Monetary resources and experts as well as legal, technique and scientific framework must be provided.

  3. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  4. The European flood risk management plan : Between spatial planning and water engineering

    NARCIS (Netherlands)

    Hartmann, Thomas; Juepner, R.

    2014-01-01

    In response to the extreme flood events of recent decades, the European Floods Directive (2007/60/EC) requires Member States of the European Union to develop Flood Risk Management Plans (Dworak & Görlach 2005). These plans need to be in place by 2015 and set‘appropriate objectives for the management

  5. The European flood risk management plan : Between spatial planning and water engineering

    NARCIS (Netherlands)

    Hartmann, Thomas; Juepner, R.

    2014-01-01

    In response to the extreme flood events of recent decades, the European Floods Directive (2007/60/EC) requires Member States of the European Union to develop Flood Risk Management Plans (Dworak & Görlach 2005). These plans need to be in place by 2015 and set‘appropriate objectives for the management

  6. Rational versus adaptive forest management planning: exploratory research on the strategic planning practices of Dutch forest management organizations

    NARCIS (Netherlands)

    Hoogstra-Klein, M.A.; Burger, M.

    2013-01-01

    The long-running debate between the rational and the adaptive school of strategic forest management planning has received considerable attention. There is, however, little empirical evidence of whether and how forest management organizations actually plan strategically. The goal of this paper is to

  7. Rational versus adaptive forest management planning: exploratory research on the strategic planning practices of Dutch forest management organizations

    NARCIS (Netherlands)

    Hoogstra-Klein, M.A.; Burger, M.

    2013-01-01

    The long-running debate between the rational and the adaptive school of strategic forest management planning has received considerable attention. There is, however, little empirical evidence of whether and how forest management organizations actually plan strategically. The goal of this paper is to

  8. Addressing Wildfire Risk in Forest Management Planning with Multiple Criteria Decision Making Methods

    Directory of Open Access Journals (Sweden)

    Susete Marques

    2017-02-01

    Full Text Available Wildfires impact the outcomes of forest management plans. Addressing that impact is thus critical for effective forest ecosystem management planning. This paper presents research on the use of multiple criteria decision making (MCDM methods that integrate wildfire risk in planning contexts characterized by multiple objectives. Specifically, an a posteriori preference modeling approach is developed that adds wildfire criteria to a set of objectives representing ecosystem services supply values. Wildfire risk criteria are derived from stand-level wildfire occurrence and damage models as well as from the characteristics of neighboring stands that may impact wildfire probability and spread. A forested landscape classified into 1976 stands is used for testing purposes. The management planning criteria include the carbon stock, harvest volumes for three forest species, the volume of the ending inventory, and resistance to wildfire risk indicators. Results show the potential of multiple criteria decision making methods to provide information about trade-offs between wildfire risk and the supply of provisioning (timber as well as regulatory (carbon ecosystem services. This information may contribute to the effectiveness of forest ecosystem management planning.

  9. Total Quality Management Plan: Technical and Logistics Services

    Science.gov (United States)

    1989-05-01

    ATES COVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Plan Technical and Logistics Services 6. AUTHOR(S) 7. PERFORMING...NUMBER OF PAGES TQM ( Total Quality Management ), Technical and Logistics Services, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...Programs C-6 2. ’LFA a. DRMS C-6 b. Defense Supply Centers C-7 c. DLSC C-7 d. DTIC C-8 11. TOTAL QUALITY MANAGEMENT PLAN TECHNICAL AND LOGISTICS SERVICES

  10. Office of General Counsel Total Quality Management Plan

    Science.gov (United States)

    1989-07-01

    Total Quality Management Plan 6. AUTHOR(S) 7...of General Counsel. - r DTIC 65 LE- E CTEn’" SEP291 989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Office of General...89) Pra-ifcr~bed ANSI Sid 139-1S ""-"’- ", ~ mmmmmu10n S S OFFICE OF GENERAL COUNSEL TOTAL QUALITY MANAGEMENT PLAN Acc’, ’ 7or. .?:" t ’_7 Codes K

  11. Total Quality Management Plan: Office of Public Affairs

    Science.gov (United States)

    1989-07-01

    AND DATES COVERED I July 1989 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Total Quality Management Plan Office of Public Affairs 6. AUTHOR(S) 7...ANSI %to 09-10 2g6. 1O2 TOTAL QUALITY MANAGEMENT PLAN Defense Logistics Agency Office of Public Affairs Ace!;son For NT-S G":I DTTC T ,’ Ju:.. t if...12 CONCEPTS We recognize that the following concepts are vital to total quality management (TQM) as it applies specifically

  12. Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and Reference Document

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1994-12-22

    The Compliance Plan Volume provides overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) and contains procedures to establish milestones to be enforced under the Order. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume and is provided for informational purposes only.

  13. Pacific Region salmon stock management plan

    National Research Council Canada - National Science Library

    1986-01-01

    .... Each option is a long-term stock management strategy that combines harvest management, habitat rehabilitation, and enhancement to increase benefits to Canadians from the salmon fishery. Contents...

  14. Engineering task plan for AX-104 residual waste volume and inventory data collection

    Energy Technology Data Exchange (ETDEWEB)

    Boechler, G.N., Fluor Daniel Hanford

    1997-03-06

    The purpose of this Engineering Task Plan is to document the strategy, equipment and responsibilities of the tasks required to preform the volume and inventory data collection of tank AX-104. The project is a part of the Hanford Tanks Initiative Plan document number WHC-SD-WM-PMP-022 Revision D.

  15. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    Science.gov (United States)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  16. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  17. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  18. Nevada Experiments and Operations Program (N Program) Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  19. Geothermal reservoir engineering management program plan (GREMP Plan)

    Energy Technology Data Exchange (ETDEWEB)

    1977-10-01

    A plan was formulated for development of the geothermal resources of the United States. Six major elements were identified to make up the research program structure. These are: properties of materials; definition of reservoir characteristics; description of example reservoirs; modeling the behavior of geothermal systems; exploitation strategies; and economics. The six elements yield twelve research categories and fifty research projects. These are discussed in detail in Appendix A and summarized in a table. (JGB)

  20. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  1. River basin management plans for the European Water Framework Directive

    NARCIS (Netherlands)

    Kronvang, B.; Bechmann, M.; Behrendt, H.; Ruboek, G.H.; Schoumans, O.F.

    2004-01-01

    The newly adopted EU water framework directive aims at protecting different water bodies by performing impact analysis and developing river basin management plans before 2009. The adoption of management measures in river basins demands that catchment managers are able to quantify the importance of d

  2. System Development of Estimated Figures of Volume Production Plan

    Science.gov (United States)

    Brazhnikov, Maksim A.; Khorina, Irina V.; Minina, Yulia I.; Kolyasnikova, Lyudmila V.; Streltsov, Aleksey V.

    2016-01-01

    The relevance of this problem is primarily determined by a necessity of improving production efficiency in conditions of innovative development of the economy and implementation of Import Substitution Program. The purpose of the article is development of set of criteria and procedures for the comparative assessment of alternative volume production…

  3. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  4. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  5. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  6. Managing Uncertainty: Thinking and Planning Strategically.

    Science.gov (United States)

    Lorenzo, Albert L.

    1993-01-01

    Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…

  7. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of...

  8. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National Preserve... to inform preparation of a Water Resources Management Plan/Environmental Impact Statement...

  9. Leopold Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This CCP articulates the management direction for the Leopold Wetland Management District for the next 15 years. Through goals, objectives, and strategies, this CCP...

  10. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  11. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  12. Grassland Management Plan Montezuma National Wildlife Refuge 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan supports the establishment of approximately 250 acres of additional managed waterfowl nesting cover and will provide the opportunity to achieve the...

  13. Chincoteague National Wildlife Refuge Upland Habitat Management Plan September 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chincoteague National Wildlife Refuge Master Plan guides the long-range development of the Refuge by identifying and integrating appropriate habitats, management...

  14. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  15. Crop and Grassland Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mingo NWR Crop and Grassland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations. In addition,...

  16. Lower Hatchie National Wildlife Refuge Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  17. Fire Management Plan for Pocosin Lakes National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan considers fire on Pocosin Lakes National Wildlife Refuge as a tool for management and as a potential problem to be dealt with. This document discusses...

  18. Fire Management Plan Rappahannock River Valley National Wildlife Refuge 2009

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan for the Rappahannock River Valley National Wildlife Refuge will provide guidance on a wide range of fire management activities including preparedness,...

  19. Fishery Management Plan for Mathews Brake National Wildlife Refuge - 1985

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Mathew's Brake National Wildlife Refuge. Data was provided by the refuge and area office...

  20. Fishery Management Plan: Banks Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to describe the fishery resources of Banks Lake NWR and to present a management scheme with supporting goals and objectives to best...