WorldWideScience

Sample records for management plan utilizing

  1. Light Duty Utility Arm computer software configuration management plan

    Energy Technology Data Exchange (ETDEWEB)

    Philipp, B.L.

    1998-09-14

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software.

  2. Demand-Side Management and Integrated Resource Planning: Findings from a Survey of 24 Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, M.

    1991-01-01

    Integrated resource planning differs from traditional utility planning practices primarily in its increased attention to demand-side management (DSM) programs and its integration of supply- and demand-side resources into a combined resource portfolio. This report details the findings from an Oak Ridge National Laboratory (ORNL) survey of 24 electric utilities that have well-developed integrated planning processes. These utilities account for roughly one-third of total capacity, electricity generation, and DSM-program expenditures nationwide. The ORNL survey was designed to obtain descriptive data on a national sample of utilities and to test a number of hypothesized relationships between selected utility characteristics and the mix of resources selected for the integrated plan, with an emphasis on the use of DSM resources and the processes by which they are chosen. The survey solicited information on each utility's current and projected resource mix, operating environment, procedures used to screen potential DSM resources, techniques used to obtain public input and to integrate supply- and demand-side options into a unified plan, and procedures used in the final selection of resources for the plan.

  3. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  4. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  5. Strategic planning in electric utilities: Using wind technologies as risk management tools

    Energy Technology Data Exchange (ETDEWEB)

    Hoff, T E [Pacific Energy Group, Stanford, CA (United States); Parsons, B [National Renewable Energy Lab., Golden, CO (United States)

    1996-06-01

    This paper highlights research investigating the ownership of renewable energy technologies to mitigate risks faced by the electric utility industry. Renewable energy technology attributes of fuel costs, environmental costs, lead time, modularity, and investment reversibility are discussed. Incorporating some of these attributes into an economic evaluation is illustrated using a municipal utility`s decision to invest in either wind generation or natural gas based generation. The research concludes that wind and other modular renewable energy technologies, such as photovoltaics, have the potential to provide decision makers with physical risk-management investments.

  6. Utility-Based HTN Planning

    NARCIS (Netherlands)

    Georgievski, Ilche; Lazovik, Alexander

    2014-01-01

    We propose the use of HTN planning for risk-sensitive planning domains. We suggest utility functions that reflect the risk attitude of compound tasks, and adapt a best-first search algorithm to take such utilities into account.

  7. Utilization of ERTS-1 data in geological evaluation, regional planning, forest management, and water management in North Carolina

    Science.gov (United States)

    Welby, C. W. (Principal Investigator); Lammi, J. O.; Carson, R. J., III

    1974-01-01

    The author has identified the following significant results. ERTS-1 imagery has been evaluated for use in resource planning and management in North Carolina, and found to be useful for general reconnaissance purposes in forestry, geology, and water resources work. It has also been used for studying large-scale transient phenomena such as river plumes and movement of sediment in the sounds. ERTS-1 imagery has been an aid to geologic and land-use mapping. Stereoscopes, projectors of various kinds, and microscopes have proved useful instruments for the kinds of data acquisition needed by resource planners and managers.

  8. Electric utility industry and planning

    Energy Technology Data Exchange (ETDEWEB)

    Schiffman, Y. (ed.)

    1983-01-01

    The objective of the workshop reported in these proceedings was to bring together planners, public officials, and community leaders with members of the utility industry to learn about utilities and to permit a meaningful exchange of information. This workshop was held at the Annual Meeting of the American Planning Association and its Energy Planning Division. The workshop was designed to inform planners about the electric-utility industry. A separate abstract was prepared for each of 4 individual presentations.

  9. Utility of Preoperative CA125 Assay in the Management Planning of Women Diagnosed with Uterine Cancer

    Directory of Open Access Journals (Sweden)

    N. Povolotskaya

    2014-01-01

    grade did not (P=0.5. Overall, at five-year follow-up, while there were no deaths among the women with preoperative serum CA125 less than 12 U/mL, eleven of the twenty-three deaths (47.82% in the study occurred in women with a preoperative CA125 more than 28 U/mL. Conclusions. A preoperative CA125 assay for women with uterine cancer is a relatively inexpensive, reproducible, and objective test which provides valuable information regarding the risk of metastatic disease and overall likelihood of long term survival. Patients with a low likelihood of metastatic/nodal disease (favourable tissue type and CA125 level < 28 U/mL and significant comorbidities may benefit from avoiding an extended complete staging procedure. Alternatively, a high level of CA125 may prompt further imaging and multidisciplinary discussions to plan for individualised management and consideration for recruitment to clinical trials.

  10. Muskrat population dynamics and vegetation utilization : A management plan : Quarterly progress report : April, May, June 1979

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Quarterly report on a study of muskrat population dynamics and vegetation utilization, being led by Utah State University for a doctorate dissertation. The study...

  11. Muskrat population dynamics and vegetation utilization : A management plan : Report on 1980 field season

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Report for the 1980 field season on a study of muskrat population dynamics and vegetation utilization, being led by Utah State University for a doctorate...

  12. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-02-01

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

  13. The clinical utility of QSM: disease diagnosis, medical management, and surgical planning.

    Science.gov (United States)

    Eskreis-Winkler, Sarah; Zhang, Yan; Zhang, Jingwei; Liu, Zhe; Dimov, Alexey; Gupta, Ajay; Wang, Yi

    2017-04-01

    Quantitative susceptibility mapping (QSM) is an MR technique that depicts and quantifies magnetic susceptibility sources. Mapping iron, the dominant susceptibility source in the brain, has many important clinical applications. Herein, we review QSM applications in the diagnosis, medical management, and surgical treatment of disease. To assist in early disease diagnosis, QSM can identify elevated iron levels in the motor cortex of amyotrophic lateral sclerosis patients, in the substantia nigra of Parkinson's disease (PD) patients, in the globus pallidus, putamen, and caudate of Huntington's disease patients, and in the basal ganglia of Wilson's disease patients. Additionally, QSM can distinguish between hemorrhage and calcification, which could prove useful in tumor subclassification, and can measure microbleeds in traumatic brain injury patients. In guiding medical management, QSM can be used to monitor iron chelation therapy in PD patients, to monitor smoldering inflammation of multiple sclerosis (MS) lesions after the blood-brain barrier (BBB) seals, to monitor active inflammation of MS lesions before the BBB seals without using gadolinium, and to monitor hematoma volume in intracerebral hemorrhage. QSM can also guide neurosurgical treatment. Neurosurgeons require accurate depiction of the subthalamic nucleus, a tiny deep gray matter nucleus, prior to inserting deep brain stimulation electrodes into the brains of PD patients. QSM is arguably the best imaging tool for depiction of the subthalamic nucleus. Finally, we discuss future directions, including bone QSM, cardiac QSM, and using QSM to map cerebral metabolic rate of oxygen. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  14. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    OpenAIRE

    Barbose, Galen

    2008-01-01

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to activ...

  15. Energy Management Plan.

    Science.gov (United States)

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  16. RTNS-II utilization plan

    Energy Technology Data Exchange (ETDEWEB)

    Zwilsky, Klaus M.

    1978-09-01

    This plan describes a general program for the effective utilization of this resource by the fusion materials community. Because its flux is low relative to levels expected in commercial fusion reactors, the RINS-II is not expected to produce data of direct engineering significance (with some exceptions). Rather, it will be used chiefly to aid in the development of models of high energy neutron effects. Such models are needed in projecting engineering data obtained in high flux fission reactors to the fusion environment. Fission reactors, because of their relatively soft neutron spectra, cannot produce the high ratio of transmutations to displacements (except in an important special case) or the high energy recoil atoms appropriate to fusion reactors utilizing the D-T reaction.

  17. Utilization of health care services in rural and urban areas: a determinant factor in planning and managing health care delivery systems.

    Science.gov (United States)

    Oladipo, Jimoh Ayanda

    2014-06-01

    Disparities in use of healthcare services between rural and urban areas have been empirically attributed to several factors. This study explores the existence of this disparity and its implication for planning and managing healthcare delivery systems. The objectives determine the relative importance of the various predisposing, enabling, need and health services factors on utilization of health services; similarity between rural and urban areas; and major explanatory variables for utilization. A four-stage model of service utilization was constructed with 31 variables under appropriate model components. Data is collected using cross-sectional sample survey of 1086 potential health services consumers in selected health facilities and resident milieu via questionnaire. Data is analyzed using factor analysis and cross tabulation. The 4-stage model is validated for the aggregate data and data for the rural areas with 3-stage model for urban areas. The order of importance of the factors is need, enabling, predisposing and health services. 11 variables are found to be powerful predictors of utilization. Planning of different categories of health care facilities in different locations should be based on utilization rates while proper management of established facilities should aim to improve health seeking behavior of people.

  18. Energy planning and management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  19. Risk management for drinking water safety in low and middle income countries - cultural influences on water safety plan (WSP) implementation in urban water utilities.

    Science.gov (United States)

    Omar, Yahya Y; Parker, Alison; Smith, Jennifer A; Pollard, Simon J T

    2017-01-15

    We investigated cultural influences on the implementation of water safety plans (WSPs) using case studies from WSP pilots in India, Uganda and Jamaica. A comprehensive thematic analysis of semi-structured interviews (n=150 utility customers, n=32 WSP 'implementers' and n=9 WSP 'promoters'), field observations and related documents revealed 12 cultural themes, offered as 'enabling', 'limiting', or 'neutral', that influence WSP implementation in urban water utilities to varying extents. Aspects such as a 'deliver first, safety later' mind set; supply system knowledge management and storage practices; and non-compliance are deemed influential. Emergent themes of cultural influence (ET1 to ET12) are discussed by reference to the risk management, development studies and institutional culture literatures; by reference to their positive, negative or neutral influence on WSP implementation. The results have implications for the utility endorsement of WSPs, for the impact of organisational cultures on WSP implementation; for the scale-up of pilot studies; and they support repeated calls from practitioner communities for cultural attentiveness during WSP design. Findings on organisational cultures mirror those from utilities in higher income nations implementing WSPs - leadership, advocacy among promoters and customers (not just implementers) and purposeful knowledge management are critical to WSP success.

  20. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  1. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  2. Utilization management in anatomic pathology.

    Science.gov (United States)

    Lewandrowski, Kent; Black-Schaffer, Steven

    2014-01-01

    There is relatively little published literature concerning utilization management in anatomic pathology. Nonetheless there are many utilization management opportunities that currently exist and are well recognized. Some of these impact only the cost structure within the pathology department itself whereas others reduce charges for third party payers. Utilization management may result in medical legal liabilities for breaching the standard of care. For this reason it will be important for pathology professional societies to develop national utilization guidelines to assist individual practices in implementing a medically sound approach to utilization management.

  3. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  4. Forest Management Plan, ERDA Oak Ridge Reservation: 1976--1980

    Energy Technology Data Exchange (ETDEWEB)

    Bradburn, D. M.

    1977-06-01

    The ERDA Oak Ridge Reservation Forest Management Plan is utilized as a guide in the managing and administering of the natural resources of the forest. A revised management plan summarizes the goals and accomplishment of the previous plan while recommending necessary improvements and alternatives for the ensuing management cycle. The management plan contains programmatic assessments of silvicultural activities and their environmental impacts.

  5. Shareholders, creditors approve utility reorganization plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-04-12

    Shareholders and all classes of secured creditors of Public Service Company of New Hampshire voted overwhelmingly last month to approve Northeast Utilities' Chapter 11 reorganization plan for PSNH, the utility announced. PSNH filed for bankruptcy protection in January 1988. Under the reorganization plan, Connecticut-based NU would acquire the utility for $2.3 billion. While PSNH's preferred and common stockholders voted to accept the proposal, holders of warrants to purchase PSNH common stock rejected the plan. Except for the votes of a group of independent power producers, PSNH's unsecured creditors also voted to accept the plan.

  6. Wolf management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A memorandum from the Assistant Region Director, Refuges and Wildlife to all U.S. Fish and Wildlife refuge managers regarding the public planning effort on wolf...

  7. Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following plan is the result of a recent initiative in Region 5 to produce general management guidance based on stated objectives for individual field stations....

  8. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  9. Fire Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan considers fire on Erie as a tool for management and as a potential problem to be dealt with. This document discusses environmental impacts and alternatives...

  10. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  11. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  12. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  13. TWRS safety management plan

    Energy Technology Data Exchange (ETDEWEB)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  14. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  15. Types of Managed Care Plans

    Science.gov (United States)

    ... Size Email Print Share Types of Managed Care Plans Page Content Article Body ​Managed care plans have ... to any deductible you must meet. High Deductible Plans (HDP): HDPs, also known as consumer directed health ...

  16. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  17. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  18. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  19. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  20. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  1. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  2. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  3. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  4. Utilization and management of alder.

    Science.gov (United States)

    David G. Briggs; Dean S. DeBell; William A. Atkinson

    1978-01-01

    In the Pacific Northwest and British Columbia, red alder often grows on forest lands following natural or man-caused disturbances. Frequently ignored as a pest or weed, many alder stands have developed to the point where important utilization and management questions are being asked. It is recognized that alder is a fast growing species, and that its rapid early growth...

  5. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  6. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  7. Light duty utility arm startup plan

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, G.A.

    1998-09-01

    This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).

  8. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  9. Heavy precipitation and the responses within emergency management - a new approach for emergency planning and disaster prevention by utilizing fire brigade operation data

    Science.gov (United States)

    Kutschker, Thomas; Glade, Thomas

    2015-04-01

    An increase of intense rainfall events in the center regions of Europe is one of the assumed effects of climate change. Climate scenarios indicate also large seasonal and regional differences concerning the magnitude. Structural damages and financial loss resulting from heavy precipitation depend on natural parameters such as topography and vegetation cover of the specific area, but also on socio-economic parameters such as urbanized and industrialized areas, population density and the presence of critical infrastructure. In particular mudflows and floods cause damages such as flooded basements and streets, undercutting of roads or spilled sewage drains. The emergency management has to consider these effects appropriately. Commonly, this is the responsibilities is taken by the fire brigades and civil protection units. Within their daily routines, numerous data is collected, but commonly not utilized for scientific purposes. In particular fire brigade operation data can be used accordingly to describe the intensity of the aftermath when heavy precipitation strikes a certain area. One application is described in this study based on a example in Offenbach, Germany. The civil protection in Germany is based on a federal system with a bottom-up command-structure and responsibility to the local community. Therefore it is not easy to collect the overall incident data for a widespread affected area. To examine particular local effects of heavy precipitation events it is necessary to match the meteorological data provided by the German Meteorological Service (DWD) with the incident data of all effected fire brigades, which sometimes is impeded by the usual resolution of meteorological data. In this study, a method of comprehensive evaluation of meteorological data and the operation data from local fire brigades has been developed for the Rhine-Main-Area. This area is one of the largest metropolitan regions in Germany with a very high density in population as well as

  10. Morris Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Morris Wetland Management District Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  11. Utility Management in the 21st Century: Challenges and Opportunities.

    Science.gov (United States)

    Schubbe, Thomas L.

    1999-01-01

    Provides an overview of the factors that must be examined and the issues to be addressed when assessing an institution's utility systems. Describes the management, planning, financing, and political dynamics surrounding the ownership of an institution's energy facilities. (GR)

  12. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  13. Bison and Elk Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Bison and Elk Management Plan is to provide managers with goals, objectives, and strategies for managing bison and elk on the National Elk Refuge...

  14. Kulm Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this habitat management plan (HMP) is to provide a strategic plan for consistently and effectively protecting, acquiring, enhancing, restoring, and...

  15. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  16. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  17. Applying electrical utility least-cost approach to transportation planning

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, G.A.; Growdon, K.; Lagerberg, B.

    1994-09-01

    Members of the energy and environmental communities believe that parallels exist between electrical utility least-cost planning and transportation planning. In particular, the Washington State Energy Strategy Committee believes that an integrated and comprehensive transportation planning process should be developed to fairly evaluate the costs of both demand-side and supply-side transportation options, establish competition between different travel modes, and select the mix of options designed to meet system goals at the lowest cost to society. Comparisons between travel modes are also required under the Intermodal Surface Transportation Efficiency Act (ISTEA). ISTEA calls for the development of procedures to compare demand management against infrastructure investment solutions and requires the consideration of efficiency, socioeconomic and environmental factors in the evaluation process. Several of the techniques and approaches used in energy least-cost planning and utility peak demand management can be incorporated into a least-cost transportation planning methodology. The concepts of avoided plants, expressing avoidable costs in levelized nominal dollars to compare projects with different on-line dates and service lives, the supply curve, and the resource stack can be directly adapted from the energy sector.

  18. Productivity enhancement planning using participative management concepts

    Science.gov (United States)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  19. Planning manual for utility application of WECS

    Energy Technology Data Exchange (ETDEWEB)

    Park, G.L. (ed.)

    1979-06-01

    A two-part approach for evaluating the feasibility of wind electric conversion systems (WECS) for utility application is presented and explained. Assessment of wind energy potential, sites, interconnection, and capital and production costing is included. The first part is a brief preliminary procedure used to determine whether the expense and effort of a detailed investigation is justified. The preliminary procedure requires assumptions which limit its accuracy. If the result indicates that WECS have probable potential for a specific utility application, then a set of modifications to detailed conventional planning procedures is developed. The modifications include discussion of wind velocity estimation and effects of site features on wind velocity, institutional problems, siting, choosing generation cases with WECS, reliability considerations, production costing, and operating problems. Appendices include an annotated bibliography, wind measurement methods, procedure for estimating WECS capacity factor, and a method for generating correlated wind velocity samples for use in production cost programs.

  20. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  1. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  2. 24 CFR 599.507 - Tax incentives utilization plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA...

  3. Defense Infrastructure: Actions Needed to Strengthen Utility Resilience Planning

    Science.gov (United States)

    2016-11-01

    DEFENSE INFRASTRUCTURE Actions Needed to Strengthen Utility Resilience Planning Report to the Committee on Armed...to Strengthen Utility Resilience Planning What GAO Found Based on GAO’s survey of Department of Defense (DOD) owned utility systems, there were...Evaluation 40 Appendix I Scope and Methodology 42 Appendix II Survey on DOD-Owned Utility Resilience 48 Appendix III Comments from the

  4. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  5. Load Forecasting in Electric Utility Integrated Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  6. Management Plan: Parts I & II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Management Plan guides the long-range development of the Refuge by identifying and integrating appropriate habitats,...

  7. Fishery Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A plan stating the slot limits and other fishing regulations on Noxubee National Wildlife Refuge. The slot limits were put in place to encourage removal of excessive...

  8. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  9. Managing Changes in Building Plans.

    Science.gov (United States)

    Schoolhouse of Quality, 2000

    2000-01-01

    Examines why school building plans get modified, how it affects the new school, and what can be done to plan for it. The role of the architect in managing change and use of a contingency fund are discussed as are the five types of changes that can happen and how they should be paid for. (GR)

  10. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  11. Integration of solar energy into utility-system planning and strategies: 1980-2000

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The purpose of the conference was to address the following questions that the utility industry must face as they make short and long-range plans to meet the nation's energy needs: (1) How do utilities develop plans for solar energy in demand forecasting, plant expansion, capital requirements, load management, and consumer relations. (2) Which solar technologies will emerge as dominant in the future. (3) What rate of growth in the utilization of solar energy can be expected by utility managers. (4) How can utilities use information on developments in solar technology in their operations, planning, and management. (5) What part can utilities expect to play in the financing and control of major solar energy technologies. The views and information presented at the conference are recorded in 17 speeches and presentations.

  12. SLURM: Simple Linux Utility for Resource Management

    Energy Technology Data Exchange (ETDEWEB)

    Jette, M; Grondona, M

    2002-12-19

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling and stream copy modules. This paper presents an overview of the SLURM architecture and functionality.

  13. SLURM: Simplex Linux Utility for Resource Management

    Energy Technology Data Exchange (ETDEWEB)

    Jette, M; Grondona, M

    2003-04-22

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling, and stream copy modules. This paper presents an overview of the SLURM architecture and functionality.

  14. Hanford site sodium management plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  15. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  16. Light duty utility arm startup plan

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, G.A.

    1998-03-11

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened.

  17. HABITAT MANAGEMENT PLAN, INTEGRATED PEST MANAGEMENT PLAN, AND VISITOR SERVICES PLAN FOR SAM D. HAMILTON NOXUBEE NATIONAL WILDLIFE REFUGE

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains 3 major plans including the Habitat Management Plan, the Integrated Pest Management Plan and the Visitor Services Plan. These plans provide...

  18. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  19. Mississippi Sandhill Crane NWR Forest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mississippi Sandhill Crane NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  20. Forest Management Plan : Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  1. Forest Management Plan : Eufaula National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Eufaula National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  2. Forest Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  3. Total Quality Management Implementation Plan.

    Science.gov (United States)

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  4. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  5. Time management problems and discounted utility.

    Science.gov (United States)

    König, Cornelius J; Kleinmann, Martin

    2007-05-01

    The lens of behavioral decision theory offers a new perspective for research on time management. The basic idea of this approach is that people discount future consequences of their time management decisions, meaning that they work on tasks with smaller but sooner outcomes rather than on tasks with larger but later outcomes. The authors performed 2 experimental studies to test whether people are sensitive to differences in the discounted utility of time management decisions. In Experiment 1, they used vignettes of typical time management situations; Experiment 2 was a laboratory simulation (an in-basket task that was part of a training assessment). Participants in both studies were German students. As expected, manipulating the discounted utility of options resulted in different time management decisions. In Experiment 1, reactions to time management situations were judged as less likely if the reactions had lower discounted utilities. In Experiment 2, people spent less time on an interruption.

  6. Least-cost utility planning consumer participation manual. [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-12-31

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state`s citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a ``How-To`` manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  7. Least-cost utility planning consumer participation manual

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-01-01

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state's citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a How-To'' manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  8. SLURM: Simple Linux Utility for Resource Management

    Energy Technology Data Exchange (ETDEWEB)

    Jette, M; Dunlap, C; Garlick, J; Grondona, M

    2002-07-08

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling and stream copy modules. The design also includes a scalable, general-purpose communication infrastructure. This paper presents a overview of the SLURM architecture and functionality.

  9. Management Planning: Innovation on Campus.

    Science.gov (United States)

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  10. Capacity Planning and Leadtime management

    NARCIS (Netherlands)

    Zijm, Willem H.M.; Buitenhek, R.

    1996-01-01

    In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities

  11. LSHTM Data Management Plan for research projects

    OpenAIRE

    Knight, G

    2017-01-01

    A Data Management Plan is a planning document that outlines the decisions made on how data will be created, managed and used during a project. This document provides a template for use when planning data management activities in your research. Completed plans should be emailed to for comment.

  12. Treatment of Solar Generation in Electric Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  13. Asset Management for Water and Wastewater Utilities

    Science.gov (United States)

    Renewing and replacing the nation's public water infrastructure is an ongoing task. Asset management can help a utility maximize the value of its capital as well as its operations and maintenance dollars.

  14. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  15. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  16. Applying Utility Functions to Adaptation Planning for Home Automation Applications

    Science.gov (United States)

    Bratskas, Pyrros; Paspallis, Nearchos; Kakousis, Konstantinos; Papadopoulos, George A.

    A pervasive computing environment typically comprises multiple embedded devices that may interact together and with mobile users. These users are part of the environment, and they experience it through a variety of devices embedded in the environment. This perception involves technologies which may be heterogeneous, pervasive, and dynamic. Due to the highly dynamic properties of such environments, the software systems running on them have to face problems such as user mobility, service failures, or resource and goal changes which may happen in an unpredictable manner. To cope with these problems, such systems must be autonomous and self-managed. In this chapter we deal with a special kind of a ubiquitous environment, a smart home environment, and introduce a user-preference-based model for adaptation planning. The model, which dynamically forms a set of configuration plans for resources, reasons automatically and autonomously, based on utility functions, on which plan is likely to best achieve the user's goals with respect to resource availability and user needs.

  17. The Service Utility Model in Service Management

    Institute of Scientific and Technical Information of China (English)

    LI Yan; ZHOU Wen-an; SONG Jun-de

    2005-01-01

    Aiming to provide a measurable service Quality of Service (QoS) evaluating method for service inventory management, this paper proposes a new mobile Service Utility Model (SUM), considers the service and business layer elements into the service utility influence profile, and proposes an self-adaptive service inventory management algorithm as a QoS control scheme based on SUM. It can be concluded from the simulation result that the service inventory utility can be fully reflected by SUM and the whole system efficiency is greatly increased by using SUM as the adaptive rule.

  18. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  19. Integrated Transport Planning Framework Involving Combined Utility Regret Approach

    DEFF Research Database (Denmark)

    Wang, Yang; Monzon, Andres; Di Ciommo, Floridea;

    2014-01-01

    Sustainable transport planning requires an integrated approach involving strategic planning, impact analysis, and multicriteria evaluation. This study aimed at relaxing the utility-based decision-making assumption by newly embedding anticipated-regret and combined utility regret decision mechanisms...... in a framework for integrated transport planning. The framework consisted of a two-round Delphi survey, integrated land use and transport model for Madrid, and multicriteria analysis. Results show that (a) the regret-based ranking has a similar mean but larger variance than the utility-based ranking does, (b...

  20. Establishing benchmarks and metrics for utilization management.

    Science.gov (United States)

    Melanson, Stacy E F

    2014-01-01

    The changing environment of healthcare reimbursement is rapidly leading to a renewed appreciation of the importance of utilization management in the clinical laboratory. The process of benchmarking of laboratory operations is well established for comparing organizational performance to other hospitals (peers) and for trending data over time through internal benchmarks. However, there are relatively few resources available to assist organizations in benchmarking for laboratory utilization management. This article will review the topic of laboratory benchmarking with a focus on the available literature and services to assist in managing physician requests for laboratory testing. © 2013.

  1. Ottawa National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ottawa NWR Cropland Management Plan addresses management practices of refuge land and serves as a guide to future management of cropland and moist soil management.

  2. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  3. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  4. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  5. Annual water management plan 1995-1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  6. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  7. Forest Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest...

  8. Litchfield Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Litchfield Wetland Management District for the next 15 years. This plan outlines the...

  9. Fur Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck NWR Fur Management Plan directs the management and regulation of trapping. The plan provides a description of the Refuge, describes the relation of...

  10. Forest Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney National Wildlife Refuge Forest Management Plan is a general plan which outlines the management objectives, forest descriptions and silviculture of various...

  11. Grassland Management Plan : Trempealeau National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Trempealeau National Wildlife Refuge Grassland Management Plan provides guidelines for grassland habitat preservation and management. The goals of this plan aim...

  12. Station Management Plan Maine Coastal Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan outlines how four Maine refuges and twelve islands and one peninsula should be managed over the next three to five years. Plan results are...

  13. A good integrated resource plan: Guidelines for electric utilities and regulators

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1992-12-01

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility`s report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  14. Handbook on Planning for Sustainability for Water and Wastewater Utilities

    Science.gov (United States)

    The handbook details steps utilities can undertake to enhance their existing planning processes to ensure that water infrastructure investments are cost-effective over their life-cycle, resource efficient and support other relevant community goals.

  15. Factors influencing utilization of Natural Family Planning among ...

    African Journals Online (AJOL)

    Factors influencing utilization of Natural Family Planning among Child Bearing Women in Chilonga ... Medical Journal of Zambia ... The literature review was mainly obtained from studies conducted globally, regionally and Zambia inclusively.

  16. Optimal planning for the sustainable utilization of municipal solid waste.

    Science.gov (United States)

    Santibañez-Aguilar, José Ezequiel; Ponce-Ortega, José María; Betzabe González-Campos, J; Serna-González, Medardo; El-Halwagi, Mahmoud M

    2013-12-01

    The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits.

  17. [Hip Fracture--Epidemiology, Management and Liaison Service. Prevention of the secondary hip fractures utilizing the regional post-referral treatment plan].

    Science.gov (United States)

    Matsushita, Mutsumi

    2015-04-01

    Fragility fracture can result in a series of fractures, with the need for the prevention of secondary hip fractures seen as increasingly pertinent in Japan. In 2006, regional post-referral treatment plans for femoral neck fracture came into effect in Japan, but treatment of fracture and prevention of secondary fracture were fragmented. Patient education about prevention included on explanation forms were commenced, but the levels of discharge prescription for osteoporosis medications did not indicate an improvement. We evaluated a fracture liaison service for post-referral treatment plans for femoral neck fracture, by registering rehabilitation-stage hospitals and surveying data over a six-month period about whether there was prescription of osteoporosis medications on discharge, and the varieties of medication prescribed.

  18. Solid Waste Management Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  19. Optimal planning for the sustainable utilization of municipal solid waste

    Energy Technology Data Exchange (ETDEWEB)

    Santibañez-Aguilar, José Ezequiel [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Ponce-Ortega, José María, E-mail: jmponce@umich.mx [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Betzabe González-Campos, J. [Institute of Chemical and Biological Researches, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Serna-González, Medardo [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); El-Halwagi, Mahmoud M. [Chemical Engineering Department, Texas A and M University, College Station, TX 77843 (United States); Adjunct Faculty at the Chemical and Materials Engineering Department, Faculty of Engineering, King Abdulaziz University, P.O. Box 80204, Jeddah 21589 (Saudi Arabia)

    2013-12-15

    Highlights: • An optimization approach for the sustainable management of municipal solid waste is proposed. • The proposed model optimizes the entire supply chain network of a distributed system. • A case study for the sustainable waste management in the central-west part of Mexico is presented. • Results shows different interesting solutions for the case study presented. - Abstract: The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits.

  20. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  1. A good integrated resource plan: Guidelines for electric utilities and regulators

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1992-12-01

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility's report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  2. A bayesian approach to laboratory utilization management

    Directory of Open Access Journals (Sweden)

    Ronald G Hauser

    2015-01-01

    Full Text Available Background: Laboratory utilization management describes a process designed to increase healthcare value by altering requests for laboratory services. A typical approach to monitor and prioritize interventions involves audits of laboratory orders against specific criteria, defined as rule-based laboratory utilization management. This approach has inherent limitations. First, rules are inflexible. They adapt poorly to the ambiguity of medical decision-making. Second, rules judge the context of a decision instead of the patient outcome allowing an order to simultaneously save a life and break a rule. Third, rules can threaten physician autonomy when used in a performance evaluation. Methods: We developed an alternative to rule-based laboratory utilization. The core idea comes from a formula used in epidemiology to estimate disease prevalence. The equation relates four terms: the prevalence of disease, the proportion of positive tests, test sensitivity and test specificity. When applied to a laboratory utilization audit, the formula estimates the prevalence of disease (pretest probability [PTP] in the patients tested. The comparison of PTPs among different providers, provider groups, or patient cohorts produces an objective evaluation of laboratory requests. We demonstrate the model in a review of tests for enterovirus (EV meningitis. Results: The model identified subpopulations within the cohort with a low prevalence of disease. These low prevalence groups shared demographic and seasonal factors known to protect against EV meningitis. This suggests too many orders occurred from patients at low risk for EV. Conclusion: We introduce a new method for laboratory utilization management programs to audit laboratory services.

  3. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  4. Blackwater National Wildlife Refuge Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Blackwater National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  5. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  6. Fur Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  7. Management plan abstract and keyword generator

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fill-in-the-blank Word form will generate abstracts for common management plans including: cropland management, disease contingency, fire management, fishing,...

  8. Furbearer Management Plan : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  9. Chautauqua National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chautauqua National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  10. Refuge Management Plan, Part III : Chapter 2 : Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  11. SLURM: Simple Linux Utility for Resource Management

    Energy Technology Data Exchange (ETDEWEB)

    Jette, M; Dunlap, C; Garlick, J; Grondona, M

    2002-04-24

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, and scheduling modules. The design also includes a scalable, general-purpose communication infrastructure. Development will take place in four phases: Phase I results in a solid infrastructure; Phase II produces a functional but limited interactive job initiation capability without use of the interconnect/switch; Phase III provides switch support and documentation; Phase IV provides job status, fault-tolerance, and job queuing and control through Livermore's Distributed Production Control System (DPCS), a meta-batch and resource management system.

  12. Survey of state regulatory activities on least cost planning for gas utilities

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A. (Lawrence Berkeley Lab., CA (United States) National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Hopkins, M.E. (Fleming Group, Washington, DC (United States))

    1991-04-01

    Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs.

  13. Utility Battery Storage Systems Program plan: FY 1994--FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

  14. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  15. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  16. Fish Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fish Management Plan for Muscatatuck NWR. The Plan provides an introduction to the Refuge, a description of the area, a description of the fish resource...

  17. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  18. Spring Creek Common Allotment habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management plan for the Spring Creek Common Allotment on Charles M. Russell National Wildlife Refuge, in McCone and Garfield Counties, Montana. This plan discusses...

  19. Santee National Wildlife Refuge Fire Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Fire Management Plan is to provide objectives and guidelines for managingthe 15,095 acres of the Santee National Wildlife Refuge. This plan will...

  20. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  1. State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, Mark Newton [Pacific Economics Group Research LLC (United States); Makos, Matt [Pacific Economics Group Research LLC (United States); Deason, Jeff [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-31

    Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Mark Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear

  2. Kirtland's Warbler Wildlife Management Area Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kirtland's Warbler Wildlife Management Area Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  3. Calculating cost savings in utilization management.

    Science.gov (United States)

    MacMillan, Donna

    2014-01-01

    A major motivation for managing the utilization of laboratory testing is to reduce the cost of medical care. For this reason it is important to understand the basic principles of cost accounting in the clinical laboratory. The process of laboratory testing includes three distinct components termed the pre-analytic, analytic and post-analytic phases. Utilization management efforts may impact the cost structure of these three phases in different ways depending on the specific details of the initiative. Estimates of cost savings resulting from utilization management programs reported in the literature have often been fundamentally flawed due to a failure to understand basic concepts such as the difference between laboratory costs versus charges and the impact of reducing laboratory test volumes on the average versus marginal cost structure in the laboratory. This article will provide an overview of basic cost accounting principles in the clinical laboratory including both job order and process cost accounting. Specific examples will be presented to illustrate these concepts in various different scenarios.

  4. Communications technologies for demand side management, DSM, and European utility communications architecture, EurUCA

    Energy Technology Data Exchange (ETDEWEB)

    Kaerkkaeinen, S.; Kekkonen, V. [VTT Energy, Espoo (Finland); Rissanen, P. [Tietosavo Oy (Finland)

    1996-12-31

    In this project the main target is to develop and assess methods for DSM (Demand Side Management) and distribution automation planning from the utility`s point of view. The final goal is to integrate these methods for the strategic planning of electric utilities. In practice the project is divided into four main parts: The development and assessment of DSM/IRP planning methods and cost/benefit analysis as a part of international co-operation (IEA DSM Agreement: Annex IV, European Cost/Benefit analysis of DSM, EUBC, and Finnish SAVE-project started in 1995 in co-operation with SRC International and six electric utilities in Finland); Development of PC-based DSM planning and assessment tools at VTT; Development of a decision support system of distribution network planning including DSM options at Tietosavo Oy and Integration of DSM planning and network planning tools in co-operation with VTT Energy and Tietosavo Oy

  5. Strategic Planning and Army Installation Management.

    Science.gov (United States)

    1996-01-01

    program. The U.S. Army has adopted the Malcolm Baldrige National Quality Award criteria for use in the ACOE program. Strategic planning is one of the...seven pillars of the Baldrige criteria. The Army has recognized that strategic planning is the key to the future. Strategic planning is the key to...and utilization of strategic planning . This paper examines through case study analysis several civilian communities and lessons learned through their

  6. 40 CFR 72.43 - Phase I reduced utilization plans.

    Science.gov (United States)

    2010-07-01

    ... the unit for any year in 1995-1999, the designated representative shall state each such limitation and... representative of the compensating unit to surrender allowances by the allowance transfer deadline of the year... utilization plans. (a) Applicability. This section shall apply to the designated representative of: (1)...

  7. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  8. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of ``traditional`` electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states` least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  9. Lower Hatchie Forest Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Forest Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  10. Montezuma National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Montezuma National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  11. Rocky Mountain Arsenal : 2006 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  12. Rocky Mountain Arsenal : 2007 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  13. Wilderness Management Plan: Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Wilderness Management Plan for Tamarac NWR provides an introduction to the Refuge; a description of the Wilderness Area; a summary of management practices;...

  14. Fisheries Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fisheries Management Plan for Muscatatuck NWR provides an introduction to the Refuge, summarizes the relationship of fishery management to Refuge objectives,...

  15. Muscatatuck National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  16. Water Management Plan Recommendations for 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This memorandum outlines the management strategy for water level management on St. Vincent Island in 2007. A table of planned water levels for each month is provided...

  17. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  18. Lacassine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lacassine National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  19. Chincoteague National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chincoteague National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  20. Agassiz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  1. Fire management plan Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to initiate the integrated program of fire management. Component management actions will include suppression (including the appropriate...

  2. Sabine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sabine NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  3. Mandalay National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mandalay NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  4. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  5. Efficient energy utilization and environmental issues applied to power planning

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Hector, E-mail: hcampbellr@gmail.com [Instituto de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C., Mexico, P.O. Box 3439, Calexico, CA 92232 (United States); Montero, Gisela; Perez, Carlos [Instituto de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C., Mexico, P.O. Box 3439, Calexico, CA 92232 (United States); Lambert, Alejandro [Facultad de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C. (Mexico)

    2011-06-15

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO{sub 2} to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO{sub 2}. The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO{sub 2}. - Highlights: > We contrast power planning methods for supply electricity for economy development. > Importance of policies for electricity savings and efficient use in power planning. > Systemic planning facilitates decision-making process for electricity optimization. > Supply-side planning will cause climb in prices and loss of energy self-sufficiency. > Power planning should be immersed in an environment of appropriate energy policies.

  6. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  7. Resource management in utility and cloud computing

    CERN Document Server

    Zhao, Han

    2013-01-01

    This SpringerBrief reviews the existing market-oriented strategies for economically managing resource allocation in distributed systems. It describes three new schemes that address cost-efficiency, user incentives, and allocation fairness with regard to different scheduling contexts. The first scheme, taking the Amazon EC2? market as a case of study, investigates the optimal resource rental planning models based on linear integer programming and stochastic optimization techniques. This model is useful to explore the interaction between the cloud infrastructure provider and the cloud resource c

  8. Data Management, a Utility for Science

    Science.gov (United States)

    Parsons, M. A.; Duerr, R.; Beitler, J.

    2005-12-01

    Data management is a utilitarian endeavor. The oft-stated explosion in scientific data volumes has almost become cliché, and it is widely assumed that we will need to adopt innovative new technologies to manage and provide access to this huge volume of data. Yet users want to concentrate on analyzing or interpreting the data and would rather not be bothered with the cutting edge particulars of how the data flows into their model, analysis tool, or instruction module. They would prefer to just push a button and have the data flow and not worry about finding, extracting, and assessing the relevant data. In short, users would prefer that data management worked like a basic utility--simple, reliable, predictable, and easy to add on to. When data managers adopt this perspective--that data archiving and and delivery is much like a utility or infrastructural technology--it informs many aspects of data systems design from general cost models to software durability and interoperability to the particulars of a user interface. This perspective does not prohibit innovative approaches to data management challenges, but it does guide the approach we take to address those challenges. The software industry is beginning to realize that some software should be viewed as basic infrastructure (e.g., traffic light timing). Similarly, the business world now recognizes that basic information technology is a routine cost of doing business much like electricity and plumbing. By reviewing the experience of these two industries and the broader evolution of utilitarian and infrastructural technologies, we develop a set of best practices that can guide the development of data systems that are durable, reliable, and simple to use.

  9. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed o...

  10. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  11. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  12. Managing Dualities in Planned Change Initiatives

    Science.gov (United States)

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  13. Planning and managing the physician workforce

    OpenAIRE

    Schoenbaum Stephen C

    2012-01-01

    Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and pro...

  14. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  15. The novel use of climate information in water utility planning

    Science.gov (United States)

    Yates, D. N.

    2016-12-01

    Municipal water utilities have a long history of planning and yet their traditional use of climate information has been rather static in nature, using approaches such as 'safe-yield' to design their water infrastructure. New planning paradigms, such as triple-bottom-line approaches that integerate environemntal, social, and financial aspects of the water enterprise have led water utilies to use climate information in a much more rich and informative way. This presentation will describe examples of how climate climate information, hydrologic modeling, and water systems decision support tools are uniquely bleneded to help water utilties make informed decisions.

  16. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  17. Multiobjective financial planning model for electric-utility rate regulation

    Energy Technology Data Exchange (ETDEWEB)

    Linke, C.M.; Whitford, D.T.

    1983-08-01

    The interests of the three parties to the regulatory process (investors in an electric utility, consumers, and regulators) are often in conflict. Investors are concerned with shareholder wealth maximization, while consumers desire dependable service at low rates. If the desired end product of regulation is to establish rates that balance the interests of consumers and investors, then a financial planning model is needed that accurately reflects the multi-objective nature of the regulatory decision process. This article develops such a multi-objective programming model for examining the efficient trade-offs available to utility regulators in setting rates of return. 8 references, 2 figures, 7 tables.

  18. Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fur management plan for Stillwater Wildlife Management Area outlines methods of fur harvest, trapping territories, selection of trappers, trapping equipment,...

  19. Integrated Pest Management Plan Kulm Wetland Management District 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  20. Amendment I : Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This amendment to the fur management plan for Stillwater Wildlife Management area calls for the annual trapping of beaver. The Lower Carson River is overpopulated...

  1. Integrated Pest Management Plan : Kulm Wetland Management District 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  2. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  3. Defense Depot Tracy Total Quality Management Plan

    Science.gov (United States)

    1989-07-01

    PAGES TQM ( Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  4. 77 FR 55222 - Notice of Availability of the Draft Resource Management Plan Amendment and the Draft...

    Science.gov (United States)

    2012-09-07

    ..., recreation management, social and economic values, utility corridors, roads and travel management, and visual... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan Amendment and the... Garfield, Moffat and Rio Blanco Counties, CO AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  5. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  6. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  7. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite States...

  8. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  9. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  10. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  11. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  12. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarett [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  13. Fishery Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Tamarac NWR provides an inventory of fishery resources on the Refuge including a description of the water area and fish sampling...

  14. Fishery management plan: Yazoo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Yazoo National Wildlife Refuge. Data was provided by the Refuge and Area Office Wildlife...

  15. Merced National Wildlife Refuge water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The details of this plan are separated into ten sections: Background, Water Management Related Goals and Objectives, Policies and Procedures, Inventory and Existing...

  16. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  17. Gulf of Maine Tern Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following management plan provides an outline of the tasks proposed to restore tern numbers to levels approximating those reached during the last period of...

  18. Meredosia National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Meredosia National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at...

  19. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  20. Cropland Management Plan: Louisa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Louisa National Wildlife Refuge Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at...

  1. 1991-92 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge – McGregor District Water Management Plan has been developed to meet the station objectives set forth...

  2. Cropland Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  3. Crop Management Plan: Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sherburne NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  4. Agassiz National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  5. Cropland Management Plan: Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  6. Fishery Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of the Mingo NWR Fishery Management Plan are to maintain and improve the quality of aquatic habitats for a well-balanced community of fish and other...

  7. Fire Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Finding of No Significant Impact (FONSI) and the Environmental Assessment (EA) for the Ottawa NWR Fire Management Plan. A description of...

  8. Yukon Flats cooperative moose management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Moose management plan designed to promote an increase in the moose populations in the following ways. Improve moose harvest reporting to better document subsistence...

  9. Cropland Management Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Dahomey NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  10. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  11. Fishery management plan for the Dorris reservoir

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for Dorris Reservoir at Modoc National Wildlife Refuge. The U.S. Fish and Wildlife service proposes to continue a public fishing program...

  12. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  13. Agassiz National Wildlife Refuge : Safety Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of this Safety Management Plan are to identify and define safety hazards that may be encountered on Agassiz Refuge and the procedures to be followed...

  14. Draft of the PHENIX Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  15. Sustainable forest management planning in Serbia

    Directory of Open Access Journals (Sweden)

    Medarević Milan

    2014-01-01

    Full Text Available The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200 years (The Plan of Deliblato Sands Afforestation 1806. There are two basic assumptions that define forest management planning: sustainability and multifunctionality. Today, forest management planning in Serbia is regulated by the Law on forests and it has the characteristics of a system. The planning also has the characteristics of an integral, integrated and adaptive system. The latter is particularly important in terms of pronounced climatic changes. For the forests in protected objects of nature, there are also other types of plans that complement sector plans in forestry (e.g. management plans in protected areas.

  16. Planning and managing the physician workforce.

    Science.gov (United States)

    Schoenbaum, Stephen C

    2012-03-12

    National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries.This is a commentary on http://www.ijhpr.org/content/1/1/13.

  17. Planning and managing the physician workforce

    Directory of Open Access Journals (Sweden)

    Schoenbaum Stephen C

    2012-03-01

    Full Text Available Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries. This is a commentary on http://www.ijhpr.org/content/1/1/13.

  18. Scoping study of integrated resource planning needs in the public utility sector

    Energy Technology Data Exchange (ETDEWEB)

    Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  19. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  20. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  1. Economics of Red Pine Management for Utility Pole Timber

    Science.gov (United States)

    Gerald H. Grossman; Karen Potter-Witter

    1991-01-01

    Including utility poles in red pine management regimes leads to distinctly different management recommendations. Where utility pole markets exist, managing for poles will maximize net returns. To do so, plantations should be maintained above 110 ft2/ac, higher than usually recommended. In Michigan's northern lower peninsula, approximately...

  2. Wilderness management plan : Farallon National Wildlife Refuge : Farallon Wilderness : Wilderness management plan [draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Farallon Wilderness. After introducing the area, it analyzes current management practices against current public...

  3. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  4. Stillwater Wildlife Management Area : Grasslands Management Plan : North Marsh Unit

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan is designed to serve as the initial Fish and Wildlife Service habitat management proposal for the North Marsh grazing unit of Stillwater National Wildlife...

  5. Total Quality Management Implementation Plan for Military Personnel Management

    Science.gov (United States)

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  6. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No. 68 / Monday, April 9, 2012... National Forest System Land Management Planning AGENCY: Forest Service, USDA. ACTION: Final rule and record... land management planning rule (planning rule). The new planning rule guides the development, amendment...

  7. Marketing a managed care plan: achieving product differentiation.

    Science.gov (United States)

    Romeo, N C

    1996-01-01

    The health care marketplace is changing dramatically, even without federal reform measures. This is a volatile, yet promising, time to market a managed care plan. Before marketing the product, it is critical that the competition is thoroughly evaluated and consumer and employer needs are researched. The final product should be distinguishable from the competition and address market needs. Promotion can then begin, utilizing a proactive public relations and advertising campaign in addition to traditional methods of marketing.

  8. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  9. The Rutgers Workflow Management System: Migrating a Digital Object Management Utility to Open Source

    Directory of Open Access Journals (Sweden)

    Grace Agnew

    2007-12-01

    Full Text Available This article examines the development, architecture, and future plans for the Workflow Management System, software developed by Rutgers University Libraries (RUL to create and catalog digital objects for repository ingest and access. The Workflow Management System (WMS was created as a front-end utility for the Fedora open source repository platform and a vehicle for a flexible, extensible metadata architecture, to serve the information needs of a large university and its collaborators. The next phase of development for the WMS shifted to a re-engineering of the WMS as an open source application. This paper discusses the design and architecture of the WMS, its re-engineering for open source release, remaining issues to be addressed before application release, and future development plans for the WMS.

  10. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  11. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  12. Myopia management: multihospital portfolio planning.

    Science.gov (United States)

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  13. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  14. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...-1104. FOR FURTHER INFORMATION CONTACT: Ecosystem Management Coordination staff's Planning Specialist... management plans (the planning rule). The National Forest Management Act (NFMA) at 16 U.S.C. 1604(g)(3)(D...

  15. Double-O Habitat Management Plan: Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Double-0 Plan is a step-down plan of the 1985 Refuge Master Plan and Environmental Assessment. The purpose of this plan is to guide the management, protection,...

  16. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  17. Data Management Facility Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  18. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  19. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  20. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  1. Working memory management and predicted utility.

    Science.gov (United States)

    Chatham, Christopher H; Badre, David

    2013-01-01

    Given the limited capacity of working memory (WM), its resources should be allocated strategically. One strategy is filtering, whereby access to WM is granted preferentially to items with the greatest utility. However, reallocation of WM resources might be required if the utility of maintained information subsequently declines. Here, we present behavioral, computational, and neuroimaging evidence that human participants track changes in the predicted utility of information in WM. First, participants demonstrated behavioral costs when the utility of items already maintained in WM declined and resources should be reallocated. An adapted Q-learning model indicated that these costs scaled with the historical utility of individual items. Finally, model-based neuroimaging demonstrated that frontal cortex tracked the utility of items to be maintained in WM, whereas ventral striatum tracked changes in the utility of items maintained in WM to the degree that these items are no longer useful. Our findings suggest that frontostriatal mechanisms track the utility of information in WM, and that these dynamics may predict delays in the removal of information from WM.

  2. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...) The functions to be exercised by the Indian Tribe pertain to the management and protection of...

  3. Using care plans to better manage multimorbidity

    Directory of Open Access Journals (Sweden)

    Mark AJ Morgan

    2015-09-01

    Full Text Available Background The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs, each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. Methods A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control from 11 Australian general practices in regional and metropolitan areas. Results Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. Conclusion The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  4. Using care plans to better manage multimorbidity.

    Science.gov (United States)

    Morgan, Mark Aj; Coates, Michael J; Dunbar, James A

    2015-01-01

    The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs), each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control) from 11 Australian general practices in regional and metropolitan areas. Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  5. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-11-01

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... States, Metropolitan Planning Organizations (MPO), and local governments that intend to initiate or continue Integrated Corridor Management (ICM) development with their partners, such as arterial management...

  6. Defense System Software Management Plan

    Science.gov (United States)

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  7. Elementary Christian School Teachers Utilizing Biblical Concepts in Classroom Management

    Science.gov (United States)

    Hill, Christy E.

    2014-01-01

    This phenomenological study examined biblical concepts utilized by elementary Christian school teachers in classroom management in two Christian schools in Virginia. Items examined included which biblical components were being utilized and how teachers are utilizing them. Determining factors influencing the incorporation of biblical concepts in…

  8. Hierarchical Planning Methodology for a Supply Chain Management

    National Research Council Canada - National Science Library

    Virna Ortiz-Araya; Víctor M Albornoz

    2012-01-01

      Hierarchical production planning is a widely utilized methodology for real world capacitated production planning systems with the aim of establishing different decision-making levels of the planning...

  9. Canadian Space Agency Space Station Freedom utilization plans

    Science.gov (United States)

    Faulkner, James; Wilkinson, Ron

    Under the terms of the NASA/CSA Memorandum of Understanding, Canada will contribute the Mobile Servicing System and be entitled to use 3 percent of all Space Station utilization resources and user accommodations over the 30 year life of the Station. Equally importantly Canada, like NASA, can begin to exploit these benefits as soon as the Man-Tended Capability (MTC) phase begins, in early 1997. Canada has been preparing its scientific community to fully utilize the Space Station for the past five years; most specifically by encouraging, and providing funding, in the area of Materials Science and Applications, and in the area of Space Life Sciences. The goal has been to develop potential applications and an experienced and proficient Canadian community able to effectively utilize microgravity environment facilities such as Space Station Freedom. In addition, CSA is currently supporting four facilities; a Laser Test System, a Large Motion Isolation Mount, a Canadian Float Zone Furnace, and a Canadian Protein Crystallization Apparatus. In late April of this year CSA sent out a Solicitation of Interest (SOI) to potential Canadian user from universities, industry, and government. The intent of the SOI was to determine who was interested, and the type of payloads which the community at large intended to propose. The SOI will be followed by the release of an Announcement of Opportunity (AO) following governmental approval of the Long Term Space plan later this year, or early next year. Responses to the AO will be evaluated and prioritized in a fair and impartial payload selection process, within the guidelines set by our international partners and the Canadian Government. Payload selection is relatively simple compared to the development and qualification process. An end-to-end user support program is therefore also being defined. Much of this support will be provided at the new headquarters currently being built in St. Hubert, Quebec. It is recognized that utilizing the

  10. Hanford site integrated pest management plan

    Energy Technology Data Exchange (ETDEWEB)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  11. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth.......The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... 1970 until 1977. The reforms established an integrated planning system aiming to achieve spatial coordination through a hierarchy of plans occurring at multiple scales and a certain degree of horizontal and vertical integration of policies across sectors and jurisdictions. Since then, Denmark has been...

  12. Policies, standards and managements associated with PG utilization

    Science.gov (United States)

    Chuan, L. M.; Zheng, H. G.; Zhao, J. J.; Wang, A. L.; Sun, S. F.

    2017-08-01

    With rapid growth in the production of high concentration phosphate and compound fertilizers in China, PG production is increasing every year. However, its utilization is not increasing at the same pace. Phosphogypsum is usually stored in such a way that not only it occupies lot of land, but also leads to minimal environmental pollution. This paper summarized the policies, standards and managements issues associated with PG utilization, and in order to help the PG utilization and management effectively.

  13. A benders decomposition approach to multiarea stochastic distributed utility planning

    Science.gov (United States)

    McCusker, Susan Ann

    Until recently, small, modular generation and storage options---distributed resources (DRs)---have been installed principally in areas too remote for economic power grid connection and sensitive applications requiring backup capacity. Recent regulatory changes and DR advances, however, have lead utilities to reconsider the role of DRs. To a utility facing distribution capacity bottlenecks or uncertain load growth, DRs can be particularly valuable since they can be dispersed throughout the system and constructed relatively quickly. DR value is determined by comparing its costs to avoided central generation expenses (i.e., marginal costs) and distribution investments. This requires a comprehensive central and local planning and production model, since central system marginal costs result from system interactions over space and time. This dissertation develops and applies an iterative generalized Benders decomposition approach to coordinate models for optimal DR evaluation. Three coordinated models exchange investment, net power demand, and avoided cost information to minimize overall expansion costs. Local investment and production decisions are made by a local mixed integer linear program. Central system investment decisions are made by a LP, and production costs are estimated by a stochastic multi-area production costing model with Kirchhoff's Voltage and Current Law constraints. The nested decomposition is a new and unique method for distributed utility planning that partitions the variables twice to separate local and central investment and production variables, and provides upper and lower bounds on expected expansion costs. Kirchhoff's Voltage Law imposes nonlinear, nonconvex constraints that preclude use of LP if transmission capacity is available in a looped transmission system. This dissertation develops KVL constraint approximations that permit the nested decomposition to consider new transmission resources, while maintaining linearity in the three

  14. Utilizing the Enterprise Resource Plannig (ERP supporting logistcs teaches and suppli chain management

    Directory of Open Access Journals (Sweden)

    Allan Augusto Platt

    2010-01-01

    Full Text Available The present work introduces one methodology for Logistics and Supply Chain Management teaching through an utilization of an Enterprise Resource Planning, called also ERP. In the first place it is defined what Logistics is, identifying the conjunct of business activities grouped under your concept, and presented to the students in the class, as well the actual concept of Supply Chain Management, covering the inter organization activities. The Enterprise Resource Planning (ERP is afterwards characterized, like an evolution of MRP System (Material Requirement Planning and the necessity of companies improve the control of yours operations and decision-making. Examples about the use of ERP like a support instrument in the process of teaching/ learning are demonstrated right away. At last the work present the possibility of ERP utilization for teaching subjects like Logistics and Supply Chain Management, clarifying using two cases developed in Brazil.

  15. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  16. Grasslands Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of this Grassland Management Plan for Tamarac NWR is to provide a variety of quality grasslands, by the year 1999 totaling 2,500 acres and eventually 5,000...

  17. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  18. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  19. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  20. Scenario-based water resources planning for utilities in the Lake Victoria region

    Science.gov (United States)

    Mehta, Vishal K.; Aslam, Omar; Dale, Larry; Miller, Norman; Purkey, David R.

    Urban areas in the Lake Victoria (LV) region are experiencing the highest growth rates in Africa. As efforts to meet increasing demand accelerate, integrated water resources management (IWRM) tools provide opportunities for utilities and other stakeholders to develop a planning framework comprehensive enough to include short term (e.g. landuse change), as well as longer term (e.g. climate change) scenarios. This paper presents IWRM models built using the Water Evaluation And Planning (WEAP) decision support system, for three towns in the LV region - Bukoba (Tanzania), Masaka (Uganda), and Kisii (Kenya). Each model was calibrated under current system performance based on site visits, utility reporting and interviews. Projected water supply, demand, revenues and costs were then evaluated against a combination of climate, demographic and infrastructure scenarios up to 2050. Our results show that water supply in all three towns is currently infrastructure limited; achieving existing design capacity could meet most projected demand until 2020s in Masaka beyond which new supply and conservation strategies would be needed. In Bukoba, reducing leakages would provide little performance improvement in the short-term, but doubling capacity would meet all demands until 2050. In Kisii, major infrastructure investment is urgently needed. In Masaka, streamflow simulations show that wetland sources could satisfy all demand until 2050, but at the cost of almost no water downstream of the intake. These models demonstrate the value of IWRM tools for developing water management plans that integrate hydroclimatology-driven supply to demand projections on a single platform.

  1. Department of Defense Energy Management Plan, 1980

    Science.gov (United States)

    1980-07-01

    Energy Usage in Existing Buildings . .......... .111-29 111-11 Timetable for Developing Utility Efficiency Standards ................. .......... 111-30...in the Defense Energy Emergency Planning System (DEEMS) document (Appendix A). The purpose of the DEEMS is to assure the availabilty of fuels to the...unleaded gasoline usage , y 1985. It is anticipated that sufficient supplies of ’alcohol and non-petroleum derived fuel will be available. DoD’s

  2. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  3. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  4. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization......The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  5. Energy management plan; Plano de gestao energetica

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira Lima, Antenor de; Assis, Francisco Mendes M. de; Burgoa, Jaime Antonio [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1992-12-31

    This paper shows methodologies and guidelines for implementation of electric power management, conservation and rational-use programmes, in various consumer sectors of the Electric Company of Minas Gerais state, Brazil. It also showed the selection criteria of this programme, the potential market evaluation and electric power conservation goals, and the attributions of the Electric Utilities involved in this programme. 9 tabs..

  6. Enhancing the utility of prostascint SPECT scans for patient management.

    Science.gov (United States)

    Noz, Marilyn E; Chung, Grace; Lee, Benjamin Y; Maguire, Gerald Q; DeWyngaert, J Keith; Doshi, Jay V; Kramer, Elissa L; Murphy-Walcott, Antoinette D; Zeleznik, Michael P; Kwak, Noeun G

    2006-04-01

    This project investigated reducing the artifact content of In-ill ProstaScint SPECT scans for use in treatment planning and management. Forty-one patients who had undergone CT or MRI scans and simultaneous Tc-99m RBC/In-111 ProstaScint SPECT scans were included. SPECT volume sets, reconstructed using Ordered Set-Expectation Maximum (OS-EM) were compared against those reconstructed with standard Filtered Back projection (FBP). Bladder activity in Tc-99m scans was suppressed within an ellipsoidal volume. Tc-99m voxel values were subtracted from the corresponding In-111 after scaling based on peak activity within the descending aorta. The SPECT volume data sets were merged with the CT or MRI scans before and after processing. Volume merging, based both on visual assessment and statistical evaluation, was not affected. Thus iterative reconstruction together with bladder suppression and blood pool subtraction may improve the interpretation and utility of ProstaScint SPECT scans for patient management.

  7. Comprehensive Conservation Plan: Huron Wetland Management District, Madison Wetland Management District, Sand Lake Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Huron Wetland Management District, Madison Wetland Management District, and Sand Lake...

  8. Maintenance Management in Network Utilities Framework and Practical Implementation

    CERN Document Server

    Gómez Fernández, Juan F

    2012-01-01

    In order to satisfy the needs of their customers, network utilities require specially developed maintenance management capabilities. Maintenance Management information systems are essential to ensure control, gain knowledge and improve-decision making in companies dealing with network infrastructure, such as distribution of gas, water, electricity and telecommunications. Maintenance Management in Network Utilities studies specified characteristics of maintenance management in this sector to offer a practical approach to defining and implementing  the best management practices and suitable frameworks.   Divided into three major sections, Maintenance Management in Network Utilities defines a series of stages which can be followed to manage maintenance frameworks properly. Different case studies provide detailed descriptions which illustrate the experience in real company situations. An introduction to the concepts is followed by main sections including: • A Literature Review: covering the basic concepts an...

  9. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  10. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  11. The demand-side management program development process: A utility perspective

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, A.K. [Oak Ridge National Lab., TN (United States); Yourstone, N.E. [Yourstone (Evelin), Albuquerque, NM (United States)

    1992-03-01

    This report describes an aspect of DSM that has received little attention, namely, how utilities develop DSM programs. The selection of utilities to study purposely was biased in favor of those with reputations for being experienced DSM program developers so as to optimize the chances to obtain detailed information. The DSM planning process is affected by organizational factors and external influences: (1) the location of the demand-side planning department within the utility; (2) the demand-side planning group`s functional responsibilities; (3) upper management participation in the DSM program development process; and (4) the organizational relationship between (or, separation of) supply-side and demand-side planning. Organizational factors reflect utilities` views of DSM programs and thus can affect the adoption of a technology- or customer-oriented approach. Despite repeated claims of the uniqueness of the demand- side planning process and its resistance to standardization, two general approaches to program development were discerned, namely technology- or customer-orientation. Although utilities consider customer related and technological factors in their DSM program development process, utilities can be differentiated by their emphasis on one or the other approach. 25 refs.

  12. The demand-side management program development process: A utility perspective

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, A.K. (Oak Ridge National Lab., TN (United States)); Yourstone, N.E. (Yourstone (Evelin), Albuquerque, NM (United States))

    1992-03-01

    This report describes an aspect of DSM that has received little attention, namely, how utilities develop DSM programs. The selection of utilities to study purposely was biased in favor of those with reputations for being experienced DSM program developers so as to optimize the chances to obtain detailed information. The DSM planning process is affected by organizational factors and external influences: (1) the location of the demand-side planning department within the utility; (2) the demand-side planning group's functional responsibilities; (3) upper management participation in the DSM program development process; and (4) the organizational relationship between (or, separation of) supply-side and demand-side planning. Organizational factors reflect utilities' views of DSM programs and thus can affect the adoption of a technology- or customer-oriented approach. Despite repeated claims of the uniqueness of the demand- side planning process and its resistance to standardization, two general approaches to program development were discerned, namely technology- or customer-orientation. Although utilities consider customer related and technological factors in their DSM program development process, utilities can be differentiated by their emphasis on one or the other approach. 25 refs.

  13. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  14. Introduction of a process-oriented quality management system for the planning area of a grid of utilities; Einfuehrung eines prozessorientierten Qualitaetsmanagementsystems fuer den Planungsbereich eines Verbund-EVU

    Energy Technology Data Exchange (ETDEWEB)

    Schaefer, R.; Haaker, H. [EnBW Ingenieure GmbH, Stuttgart (Germany)

    1999-10-01

    At the beginning of 1996 Badenwerk AG decided to introduce a Quality Management System (QM System) to DIN EN ISO 9001 for a section of their enterprise. This system has been elaborated with the joint efforts of the staff of the respective section. In elaborating this system, the requirements of the technical manager who has to solve complex planning and construction tasks in energy plant construction were to be taken into consideration. The chosen form of representation of procedure description has created an optimum of transparency which is a prerequisite for a sustained, continual improvement process and best possible client orientation. The QM System has therefore been developed and arranged in a procedure-oriented way. It could be put into force in March 1997; in November 1997 it has been certified by TUeV-CERT. (orig.) [Deutsch] Anfang 1996 beschloss Badenwerk AG, fuer einen Teilbereich des Unternehmens ein Qualitaetsmanagement-System (QM-System) nach DIN EN ISO 9001 einzufuehren. Dieses System wurde unter Einbindung der Mitarbeiter des betroffenen Bereiches erarbeitet. Dabei war sicherzustellen, dass den Erfordernissen und Belangen eines technischen Dienstleisters, der komplexe Planungs- und Errichtungsaufgaben im Energieanlagenbau zu loesen hat, Rechnung getragen wird. Durch die gewaehlte Darstellung der Ablaufbeschreibungen wird ein Hoechstmass an Transparenz geschaffen, die Voraussetzung fuer einen konsequenten kontinuierlichen Verbesserungsprozess und groesstmoegliche Kundenorientierung ist. Das QM-System wurde daher prozess- und ablauforientiert entwickelt und gegliedert. Ende Maerz 1997 konnte es in Kraft gesetzt werden; im November 1997 wurde es durch den TUeV-CERT zertifiziert. (orig.)

  15. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... is up to two wavelengths, significant capacity savings are possible. Network planning in the form of optimal design of national and regional telecommunication networks is thoroughly studied and promising computer programs and methods are developed. In the optimization process are both duct, fiber......, and switch equipment cost considered. The contribution in network planning are one of the most important contributions with direct usability....

  16. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  17. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  18. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  19. Des Lacs National Wildlife Refuge Water Management Plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  20. Water Management Plan 1949 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  1. Pocosin Lakes National Wildlife Refuge : 2006 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  2. Pocosin Lakes National Wildlife Refuge : 2009 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2009 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  3. Des Lacs National Wildlife Refuge Water Management Plan 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  4. Water Management Plan 1950 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  5. Water Management Plan Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  6. Des Lacs National Wildlife Refuge Water Management Plan 1961

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  7. Des Lacs National Wildlife Refuge Water Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  8. Pocosin Lakes National Wildlife Refuge : 2004 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  9. Strategic plan for Hanford site information management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  10. U.S. electric utility demand-side management 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents comprehensive information on electric power industry demand-side management activities in the United States at the national, regional, and utility levels. Data is included for energy savings, peakload reductions, and costs.

  11. U.S. electric utility demand-side management 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents comprehensive information on electric power industry demand-side management activities in the United States at the national, regional, and utility levels. Data is included for energy savings, peakload reductions, and costs.

  12. Yukon Flats National Wildlife Refuge Fishery. Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Yukon Flats National Wildlife Refuge Fishery Management Plan (Fishery Plan) provides comprehensive management direction to insure that fish species and habitats...

  13. Windom Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Windom Wetland Management District for the next 15 years. This plan outlines the...

  14. Forest Management Plan : Upper Mississippi River Wildlife & Fish Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi National Wildlife and Fish Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest...

  15. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  16. Grassland Management Plan: Union Slough National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The plan outlines grassland habitat management objectives for Union Slough National Wildilfe Refuge. The Grassland Management Plan objectives include; preserve...

  17. Comprehensive Conservation Plan: North Dakota Wetland Management Districts

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on North Dakota Wetland Management Districts for the next 15 years. This plan outlines the...

  18. Iowa Wetland Management District: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Iowa Wetland Management District for the next 15 years. This plan outlines the Refuge...

  19. Comprehensive hatchery management plan: Carson National Fish Hatchery

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Hatchery Management Plan (CHMP) for the Carson National Fish Hatchery (NFH) is an operational management plan which outlines policy, legal...

  20. Crab Orchard National Wildlife Refuge : Wilderness Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Wilderness Management Plan is a general plan which outlines the Refuge management objectives, wilderness creation and...

  1. Ottawa National Wildlife Refuge : Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Ottawa NWR Integrated Pest Management plan (IPM) is to provide a plan and a tool for adaptive management of invasive species on the Refuge. The...

  2. St. Croix Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on St. Croix Wetland Management District for the next 15 years. This plan outlines the...

  3. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  4. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  5. Trusted Computing Exemplar: Life Cycle Management Plan

    Science.gov (United States)

    2014-12-12

    Informal “An informal specification is written as prose in natural language...(e.g., Dutch, English, French, German). An informal specification is not...informal) prose . The restricted syntax language may be a natural language with restricted sentence structure and keywords with special meaning, or it may...accompanied by supporting explanatory (informal) prose .” [4] TCX: Life Cycle Management Plan NPS-CAG-14-002 4 2 Life Cycle Phases and Activities

  6. Remote sensing for land management and planning

    Science.gov (United States)

    Woodcock, Curtis E.; Strahler, Alan H.; Franklin, Janet

    1983-05-01

    The primary role of remote sensing in land management and planning has been to provide information concerning the physical characteristics of the land which influence the management of individual land parcels or the allocation of lands to various uses These physical characteristics have typically been assessed through aerial photography, which is used to develop resource maps and to monitor changing environmental conditions These uses are well developed and currently well integrated into the planning infrastructure at local, state, and federal levels in the United States. Many newly emerging uses of remote sensing involve digital images which are collected, stored, and processed automatically by electromechanical scanning devices and electronic computers Some scanning devices operate from aircraft or spacecraft to scan ground scenes directly; others scan conventional aerial transparencies to yield digital images. Digital imagery offers the potential for computer-based automated map production, a process that can significantly increase the amount and timeliness of information available to land managers and planners. Future uses of remote sensing in land planning and management will involve geographic information systems, which store resource information in a geocoded format. Geographic information systems allow the automated integration of disparate types of resource data through various types of spatial models so that with accompanying sample ground data, information in the form of thematic maps and/ or aerially aggregated statistics can be produced Key issues confronting the development and integration of geographic information systems into planning pathways are restoration and rectification of digital images, automated techniques for combining both quantitative and qualitative types of data in information-extracting procedures, and the compatibility of alternative data storage modes

  7. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  8. Utilizing verbally told stories for informal knowledge management

    NARCIS (Netherlands)

    Lukosch, S.G.; Klebl, M.; Buttler, T.

    2011-01-01

    In knowledge management, the act of telling stories is utilized to capture and convey knowledge. Spoken language is the basis for telling stories. Collaborative audio-based storytelling uses the act of verbally telling stories in groups. In this paper, we explore how to utilize verbally told stories

  9. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  10. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector.

  11. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  12. Management strategies in hospitals: scenario planning

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  13. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. Before grant assistance can be awarded for any treatment works project, the Regional Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  14. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2012-07-27

    ... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning; Correction...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012..., Subpart A--National Forest System Land Management Planning (36 CFR part 219, subpart A). One technical...

  15. 78 FR 13316 - National Forest System Land Management Planning Directives

    Science.gov (United States)

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... CONTACT: Annie Eberhart Goode, Planning Specialist, Ecosystem Management Coordination Staff, 202-205-1056...

  16. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. (a) From funds reserved under § 35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to: (1...

  17. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  18. 7 CFR 225.4 - Program management and administration plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Program management and administration plan. 225.4... Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year, each State agency shall submit to FNSRO a Program management and administration plan for that...

  19. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  20. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  1. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  2. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  3. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  4. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  5. Department of Energy plan for recovery and utilization of nuclear byproducts from defense wastes. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1983-08-01

    Nuclear wastes from the defense production cycle contain many uniquely useful, intrinsically valuable, and strategically important materials. These materials have a wide range of known and potential applications in food technology, agriculture, energy, public health, medicine, industrial technology, and national security. Furthermore, their removal from the nuclear waste stream can facilitate waste management and yield economic, safety, and environmental advantages in the management and disposal of the residual nuclear wastes that have no redemptive value. This document is the program plan for implementing the recovery and beneficial use of these valuable materials. An Executive Summary of this document, DOE/DP-0013, Vol. 1, January 1983, is available. Program policy, goals and strategy are stated in Section 2. Implementation tasks, schedule and funding are detailed in Section 3. The remaining five sections and the appendixes provide necessary background information to support these two sections. Section 4 reviews some of the unique properties of the individual byproduct materials and describes both demonstrated and potential applications. The amounts of byproduct materials that are available now for research and demonstration purposes, and the amounts that could be recovered in the future for expanded applications are detailed in Section 5. Section 6 describes the effects byproduct recovery and utilization have on the management and final disposal of nuclear wastes. The institutional issues that affect the recovery, processing and utilization of nuclear byproducts are discussed in Section 7. Finally, Section 8 presents a generalized mathematical process by which applications can be evaluated and prioritized (rank-ordered) to provide planning data for program management.

  6. Hanford site ground water protection management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  7. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... management planning for Indian forest land shall be carried out through participation in the development and...

  8. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  9. Assessing interdependent operational, tactical and strategic risks for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2015-05-01

    Risk management plays a key role in water utilities. Although risk tools are well-established at operational levels, approaches at the strategic level are rarely informed by systemic assessments of the water supply and lack a long-term perspective. Here, we report a baseline strategic risk analysis, founded on a systemic analysis of operational risks developed 'bottom-up' and validated in a large water utility. Deploying an action-oriented research method, supported by semi- structured interviews with in-house water utility risk experts, deep connections are established between operational risk and strategic risk that surpass those existing elsewhere in the sector. Accessible presentational formats - influence diagrams, risk "heat-maps" and supporting narratives are used to promote Board-level risk discussions, and characterise a baseline set of strategic risks core to forward utility master planning. Uniquely, the influence of operational events, exposures and potential harms, together with the mitigating measures in place to mediate these risks are linked to corporate objectives on business sustainability, profitability, water quality, water quantity, supply disruption and reputation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. 31 CFR 206.6 - Cash management planning and review.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review... planning and review. (a) An agency shall periodically perform cash management reviews to identify areas...) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL AGENCY...

  11. PLANNING AND MANAGING VIRTUALIZED NEXT GENERATION NETWORKS

    Directory of Open Access Journals (Sweden)

    Sukant K. Mohapatra

    2015-11-01

    Full Text Available Service convergence, content digitization, rapid and flexible service delivery, reduction of capital and operating costs, economies of scale, changes in telecom policy and regulation, and ever increasing competition have been key factors in the evolution of virtualized Next Generation Networks (vNGN. IPcentric converged networks aim to provide a multitude of services over a single network infrastructure. Tremendous success and benefit of server virtualization in data centers is driving the adaption of network virtualization. Network virtualization is applicable to enterprise data center, and enterprise as well as wide area networks. The focus of this paper is network virtualization aspects of service providers’ next generation network. The key factors for moving to virtualized network is optimal use and sharing of network infrastructure even among competitive service providers, programmability of network and rapid introduction of new service and standard based on open platform rather than proprietary implementation. Evolving Software Defined Network (SDN and Network Function Virtualization (NFV shall enable common network infrastructure sharing, control, and management at a higher layer thus making network devices more generic and less intelligent, thus enabling cost competitiveness and quick service delivery. Network virtualization shall enable key benefits such as lower cost, flexibility, efficiency, and security, However, the deployment of virtualized next generation networks has brought its unique challenges for network managers and planners, as the network has to be planned in a comprehensive way with effective management of virtual network elements, its correlation with physical infrastructure and monitoring of control functions and server platforms. This paper discusses generic next generation network, its virtualization, and addresses the challenges related to the planning and managing of virtualized next generation networks. This

  12. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  13. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  14. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  15. Exploring utility function in utility management: an evaluating method of library preservation.

    Science.gov (United States)

    Yan, Bin; Shi, Feng; Yu, Rui-Qiang

    2013-12-01

    In order to seek a new method of book evaluation and realize book resources sharing among the regional university libraries, we think that library should collect books of the high utility value in the case of limited funds. We proposed a changing Bellman equation as a utility function and used the explicit functions of the book usage factor and the book usage half-life derived from the utility function as an evaluating method of the collecting books. The results from empirical data given some conclusions such as the varieties diversity, the collected risk, the tendencies of reading varieties, species continuity and so on and a librarian can use the utility management to supplement the collections management.

  16. Trade-off decisions in distribution utility management

    Science.gov (United States)

    Slavickas, Rimas Anthony

    As a result of the "unbundling" of traditional monopolistic electricity generation and transmission enterprises into a free-market economy, power distribution utilities are faced with very difficult decisions pertaining to electricity supply options and quality of service to the customers. The management of distribution utilities has become increasingly complex, versatile, and dynamic to the extent that conventional, non-automated management tools are almost useless and obsolete. This thesis presents a novel and unified approach to managing electricity supply options and quality of service to customers. The technique formulates the problem in terms of variables, parameters, and constraints. An advanced Mixed Integer Programming (MIP) optimization formulation is developed together with novel, logical, decision-making algorithms. These tools enable the utility management to optimize various cost components and assess their time-trend impacts, taking into account the intangible issues such as customer perception, customer expectation, social pressures, and public response to service deterioration. The above concepts are further generalized and a Logical Proportion Analysis (LPA) methodology and associated software have been developed. Solutions using numbers are replaced with solutions using words (character strings) which more closely emulate the human decision-making process and advance the art of decision-making in the power utility environment. Using practical distribution utility operation data and customer surveys, the developments outlined in this thesis are successfully applied to several important utility management problems. These involve the evaluation of alternative electricity supply options, the impact of rate structures on utility business, and the decision of whether to continue to purchase from a main grid or generate locally (partially or totally) by building Non-Utility Generation (NUG).

  17. Zonal management of multi-purposes groundwater utilization based on water quality and impact on the aquifer.

    Science.gov (United States)

    Liang, Ching-Ping; Jang, Cheng-Shin; Chen, Ching-Fang; Chen, Jui-Sheng

    2016-07-01

    Groundwater is widely used for drinking, irrigation, and aquaculture in the Pingtung Plain, Southwestern Taiwan. The overexploitation and poor quality of groundwater in some areas of the Pingtung Plain pose great challenges for the safe use and sustainable management of groundwater resources. Thus, establishing an effective management plan for multi-purpose groundwater utilization in the Pingtung Plain is imperative. Considerations of the quality of the groundwater and potential impact on the aquifer of groundwater exploitation are paramount to multi-purpose groundwater utilization management. This study proposes a zonal management plan for the multi-purpose use of groundwater in the Pingtung Plain. The zonal management plan is developed by considering the spatial variability of the groundwater quality and the impact on the aquifer, which is defined as the ratio of the actual groundwater extraction rate to transmissivity. A geostatistical Kriging approach is used to spatially delineate the safe zones based on the water quality standards applied in the three groundwater utilization sectors. Suitable zones for the impact on the aquifer are then spatially determined. The evaluation results showing the safe water quality zones for the three types of utilization demands and suitable zones for the impact on aquifer are integrated to create a zonal management map for multi-purpose groundwater utilization which can help government administrators to establish a water resource management strategy for safe and sustainable use of groundwater to meet multi-purpose groundwater utilization requirements in the Pingtung Plain.

  18. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  19. Habitat Management Plan - Clarks River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Habitat Management Plans (HMPs) are dynamic working documents that provide refuge managers a decision-making process; guidance for the management of the refuge’s...

  20. Furbearer Management Plan : Big Stone National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Stone NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  1. Bombay Hook National Wildlife Refuge Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  2. Marsh and Water Management Plan : Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The marsh and water management plan outlines and describes management strategies for maintenance, rehabilitation, and development of managed waters on the Clarence...

  3. Fur Management Plan: Mark Twain National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  4. Long Term Fur Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  5. Crab Orchard National Wildlife Refuge : Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  6. Station Management Plan Long Island National Wildlife Refuge Complex 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan provides the Refuge Manager with three to five year guidance for managing eight National Wildlife Refuges located on Long Island, New...

  7. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  8. 1995 Annual Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1995 Water Management Plan for Muscatatuck NWR begins by summarizing the 1994 Water Management Program. Management results for moist soil units, green tree...

  9. Benton Lake National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Benton Lake NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  10. Mixed Waste Focus Area program management plan

    Energy Technology Data Exchange (ETDEWEB)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  11. Injury risk management plan for volleyball athletes.

    Science.gov (United States)

    James, Lachlan P; Kelly, Vincent G; Beckman, Emma M

    2014-09-01

    Volleyball is an increasingly popular team sport. As with any competitive sport, there is an inherent risk of injury that must be recognized and collaboratively managed. This article provides a practical approach to the management of volleyball injuries within a team or organization. A brief review of the epidemiological data is presented which establishes (i) ankle sprain, (ii) shoulder overuse injury, (iii) patella tendinopathy, and (iv) anterior cruciate ligament injury as the primary injuries to address amongst these athletes. The interaction of modifiable and non-modifiable risk factors for these injuries are used to classify athletes into high-, medium- and low-risk groups. Targeted training interventions are suggested, based upon the risk level of the athlete, to minimize the occurrence of these injuries. Practical methods for integrating these activities into a training plan are also discussed.

  12. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans...

  13. Utilization management in radiology, part 2: perspectives and future directions.

    Science.gov (United States)

    Duszak, Richard; Berlin, Jonathan W

    2012-10-01

    Increased utilization of medical imaging in the early part of the last decade has resulted in numerous efforts to reduce associated spending. Recent initiatives have focused on managing utilization with radiology benefits managers and real-time order entry decision support systems. Although these approaches might seem mutually exclusive and their application to radiology appears unique, the historical convergence and broad acceptance of both programs within the pharmacy sector may offer parallels for their potential future in medical imaging. In this second installment of a two-part series, anticipated trends in radiology utilization management are reviewed. Perspectives on current and future potential roles of radiologists in such initiatives are discussed, particularly in light of emerging physician payment models. Copyright © 2012 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  14. U.S. electric utility demand-side management 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Electric Utility Demand-Side Management report presents comprehensive information on electric power industry demand-side management (DSM) activities in the US at the national, regional, and utility levels. The objective of the publication is to provide industry decision makers, government policy makers, analysts, and the general public with historical data that may be used in understanding DSM as it related to the US electric power industry. The first chapter, ``Profile: U.S. Electric Utility Demand-Side Management,`` presents a general discussion of DSM, its history, current issues, and a review of key statistics for the year. Subsequent chapters present discussions and more detailed data on energy savings, peak load reductions and costs attributable to DSM. 9 figs., 24 tabs.

  15. U.S. electric utility demand-side management 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The US Electric Utility Demand-Side Management report is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternative Fuels; Energy Information Administration (EIA); US Department of Energy. The report presents comprehensive information on electric power industry demand-side management (DSM) activities in the US at the national, regional, and utility levels. The objective of the publication is to provide industry decision makers, government policy makers, analysts, and the general public with historical data that may be used in understanding DSM as it relates to the US electric power industry. The first chapter, ``Profile: US Electric Utility Demand-Side Management``, presents a general discussion of DSM, its history, current issues, and a review of key statistics for the year. Subsequent chapters present discussions and more detailed data on energy savings, peak load reductions and costs attributable to DSM. 9 figs., 24 tabs.

  16. Environmental planning and management in Greater Johannesburg.

    Science.gov (United States)

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  17. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  18. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental asses...... in their SEAs of RBMPs is weak. In this paper the connections between climate change and water are reviewed. As a result, it is suggested that climate change needs to be considered in three ways: mitigation, adaptation and baseline adaptation. Udgivelsesdato: December......In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  19. HotSpot Software Configuration Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  20. US electric utility demand-side management, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-26

    The report presents comprehensive information on electric power industry demand-side management (DSM) activities in US at the national, regional, and utility levels. Objective is provide industry decision makers, government policy makers, analysts, and the general public with historical data that may be used in understanding DSM as it relates to the US electric power industry. The first chapter, ``Profile: US Electric Utility Demand-Side Management,`` presents a general discussion of DSM, its history, current issues, and a review of key statistics for the year. Subsequent chapters present discussions and more detailed data on energy savings, peak load reductions, and costs attributable to DSM.

  1. PUREX/UO{sub 3} deactivation project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  2. Successful process management for public utilities; Erfolgreiches Prozessmanagement fuer Stadtwerke

    Energy Technology Data Exchange (ETDEWEB)

    Knipprath, Daniel [projekt:unternehmensberatungsgesellschaft mbH, Muenchen (Germany); Schaefer, Anke [Dr. Schaefer PR- und Strategieberatung, Rostock (Germany)

    2011-06-15

    As a result of regulatory cuts in their revenue structure, public utilities are increasingly compelled to improve their cost efficiency. Furthermore, they have to deal with altered framework conditions of energy procurement as well as the necessity of sustainable customer loyalty management. The example of a regional supplier is used here to show how goal-oriented process management can contribute to securing a sustainable, promising position in the market.

  3. When the 'soft-path' gets hard: demand management and financial instability for water utilities

    Science.gov (United States)

    Zeff, H. B.; Characklis, G. W.

    2014-12-01

    In the past, cost benefit analysis (CBA) has been viewed as an effective means of evaluating water utility strategies, particularly those that were dependent on the construction of new supply infrastructure. As water utilities have begun to embrace 'soft-path' approaches as a way to reduce the need for supply-centric development, CBA fails to recognize some important financial incentives affected by reduced water consumption. Demand management, both as a short-term response to drought and in longer-term actions to accommodate demand growth, can introduce revenue risks that adversely affect a utility's ability to repay debt, re-invest in aging infrastructure, or maintain reserve funds for use in a short-term emergency. A utility that does not generate sufficient revenue to support these functions may be subject to credit rating downgrades, which in turn affect the interest rate it pays on its debt. Interest rates are a critical consideration for utility managers in the capital-intensive water sector, where debt payments for infrastructure often account for a large portion of a utility's overall costs. Even a small increase in interest rates can add millions of dollars to the cost of new infrastructure. Recent studies have demonstrated that demand management techniques can lead to significant revenue variability, and credit rating agencies have begun to take notice of drought response plans when evaluating water utility credit ratings, providing utilities with a disincentive to fully embrace soft-path approaches. This analysis examines the impact of demand management schemes on key credit rating metrics for a water utility in Raleigh, North Carolina. The utility's consumer base is currently experiencing rapid population growth, and demand management has the potential to reduce the dependence on costly new supply infrastructure but could lead to financial instability that will significantly increase the costs of financing future projects. This work analyzes how 'soft

  4. Optimization in the utility maximization framework for conservation planning: a comparison of solution procedures in a study of multifunctional agriculture

    Directory of Open Access Journals (Sweden)

    Jason Kreitler

    2014-12-01

    Full Text Available Quantitative methods of spatial conservation prioritization have traditionally been applied to issues in conservation biology and reserve design, though their use in other types of natural resource management is growing. The utility maximization problem is one form of a covering problem where multiple criteria can represent the expected social benefits of conservation action. This approach allows flexibility with a problem formulation that is more general than typical reserve design problems, though the solution methods are very similar. However, few studies have addressed optimization in utility maximization problems for conservation planning, and the effect of solution procedure is largely unquantified. Therefore, this study mapped five criteria describing elements of multifunctional agriculture to determine a hypothetical conservation resource allocation plan for agricultural land conservation in the Central Valley of CA, USA. We compared solution procedures within the utility maximization framework to determine the difference between an open source integer programming approach and a greedy heuristic, and find gains from optimization of up to 12%. We also model land availability for conservation action as a stochastic process and determine the decline in total utility compared to the globally optimal set using both solution algorithms. Our results are comparable to other studies illustrating the benefits of optimization for different conservation planning problems, and highlight the importance of maximizing the effectiveness of limited funding for conservation and natural resource management.

  5. Optimization in the utility maximization framework for conservation planning: a comparison of solution procedures in a study of multifunctional agriculture.

    Science.gov (United States)

    Kreitler, Jason; Stoms, David M; Davis, Frank W

    2014-01-01

    Quantitative methods of spatial conservation prioritization have traditionally been applied to issues in conservation biology and reserve design, though their use in other types of natural resource management is growing. The utility maximization problem is one form of a covering problem where multiple criteria can represent the expected social benefits of conservation action. This approach allows flexibility with a problem formulation that is more general than typical reserve design problems, though the solution methods are very similar. However, few studies have addressed optimization in utility maximization problems for conservation planning, and the effect of solution procedure is largely unquantified. Therefore, this study mapped five criteria describing elements of multifunctional agriculture to determine a hypothetical conservation resource allocation plan for agricultural land conservation in the Central Valley of CA, USA. We compared solution procedures within the utility maximization framework to determine the difference between an open source integer programming approach and a greedy heuristic, and find gains from optimization of up to 12%. We also model land availability for conservation action as a stochastic process and determine the decline in total utility compared to the globally optimal set using both solution algorithms. Our results are comparable to other studies illustrating the benefits of optimization for different conservation planning problems, and highlight the importance of maximizing the effectiveness of limited funding for conservation and natural resource management.

  6. Draft Pacific Flyway management plan for the emperor goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to update previous versions of this plan (Pacific Flyway Council 1988) and reemphasize established goals and strategies for management of...

  7. Mark Twain National Wildlife Refuge : Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  8. Fisheries Management Plan Cameron Prairie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the fisheries management plan for the refuge. This plan develops strategies and tasks for maintaining a viable fishery for Unit 8. There are other areas...

  9. Wildland Fire Management Plan: Great River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan (FMP) for the Great River National Wildlife Refuge and for purposes of this plan includes Clarence Cannon National...

  10. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  11. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  12. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  13. Pacific Flyway management plan for the dusky Canada goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan for the dusky Canada goose (Branta canadensis occidentalis) is a revision of earlier plans adopted by the Pacific Flyway Council (1973, 1985,...

  14. Station Management Plan Mason Neck National Wildlife Refuge 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In March 1992, a planning team met to identify issues, set objectives and develop strategies for management of the three refuges. The information from the planning...

  15. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  16. Bear River Migratory Bird Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Bear River Migratory Bird Refuge for the next 15 years. This plan outlines the Refuge...

  17. Fishery management plan: Morgan Brake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines goals and objectives recommended by the Service Fisheries Assistance program. The plan is to be used as a guide in managing the Refuge's fishery...

  18. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  19. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and formulating the ... determine the planning perspective and problems approach in order to determine bottlenecks respectively. .... Goibar, Sari, Neka, Behshhr and Galogah cities.

  20. Marsh and Water Management Plan: Back Bay National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Marsh and Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of...

  1. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  2. Water Management Plan: Savannah National Wildlife Refuge Calendar Year 1962

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water Management Plan for Savannah NWR for calendar year 1962. This plan includes brief habitat descriptions and specific actions for Pools 2-7A, as well as...

  3. Umatilla National Wildlife Refuge: Comprehensive Conservation Plan Management Direction

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Umatilla NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  4. Rocky Mountain Arsenal 5 year fish and wildlife management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This five year management plan for Rocky Mountain Arsenal National Wildlife Refuge (RMA) was developed as a dynamic planning aid to guide and prioritize annual and...

  5. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  6. Water Management Plan: Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  7. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  8. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    Science.gov (United States)

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM ( Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  9. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    Science.gov (United States)

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  10. Natural resource inventory for urban planning utilizing remote sensing techniques

    Science.gov (United States)

    Foster, K. E.; Mackey, P. F.; Bonham, C. D.

    1972-01-01

    Remote sensing techniques were applied to the lower Pantano Wash area to acquire data for planning an ecological balance between the expanding Tucson metropolitan area and its environment. The types and distribution of vegetation are discussed along with the hydrologic aspects of the Wash.

  11. Dueling Scorecards: How Two Colleges Utilize the Popular Planning Method

    Science.gov (United States)

    Ballentine, Howard; Eckles, Jay

    2009-01-01

    The Balanced Scorecard is a planning model used extensively in business to provide direction and accountability to an organization. Despite the demonstrated success of the model, it has not been widely used in higher education. This article compares and contrasts the use of the Balanced Scorecard by two small, private colleges. The article…

  12. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    Science.gov (United States)

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  13. Turn over folders: a proven tool in succession management planning.

    Science.gov (United States)

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  14. LiDAR utility for natural resource managers

    Science.gov (United States)

    Andrew Thomas Hudak; Jeffrey Scott Evans; Alistair Mattthew Stuart. Smith

    2009-01-01

    Applications of LiDAR remote sensing are exploding, while moving from the research to the operational realm. Increasingly, natural resource managers are recognizing the tremendous utility of LiDAR-derived information to make improved decisions. This review provides a cross-section of studies, many recent, that demonstrate the relevance of LiDAR across a suite of...

  15. SSL Pricing and Efficacy Trend Analysis for Utility Program Planning

    Energy Technology Data Exchange (ETDEWEB)

    Tuenge, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-10-01

    Report to help utilities and energy efficiency organizations forecast the order in which important SSL applications will become cost-effective and estimate when each "tipping point" will be reached. Includes performance trend analysis from DOE's LED Lighting Facts® and CALiPER programs plus cost analysis from various sources.

  16. UTILITY OF ANNUAL FINANCIAL STATEMENTS IN THE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    PUICAN LILIANA

    2015-07-01

    Full Text Available Process knowledge of the financial situation of the economic entity presupposes the use of analysis and synthesis, as indispensable tools of investigation. Financial management of the economic entity have to belong to the basic role in strategic financial decisions that would solve the problem of effective management of the process optimal growth, balanced and proportionate entity. That is why it becomes necessary and imperative objective analysis of the implications of the current financial management in economic entities familiarize managers with the basic tools with which they operate, acquiring knowledge about planning and financial control, evaluation techniques of investment projects, about how to conduct financial and economic diagnosis and management control of the entity, the key issues in its orientation towards performance.

  17. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  18. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  19. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  20. Total Quality Management Office for Contracting Integrity Implementation Plan

    Science.gov (United States)

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  1. Developing a Sand Management Plan for Galveston Island

    Science.gov (United States)

    2015-10-16

    US Army Corps of Engineers BUILDING STRONG® Developing a Sand Management Plan for Galveston Island Ashley E. Frey, P. E. Research Civil...GenCade Alternatives • Sand Management Alternatives and Plan • Beach Nourishment Project 2 Innovative solutions for a safer, better world...BUILDING STRONG® Problem Statement/Approach Recommend a long-term plan of actions to better manage sands on Galveston Island Initial Tasks

  2. Neutralized current acid waste consolidation management plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Brown, R.G.; Galbraith, J.; Jensen, C.; Place, D.E.; Reddick, G.W.; Zuroff, W. [Westinghouse Hanford Co., Richland, WA (United States); Brothers, A.J. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-01-01

    The scope of this evaluation is to recommend a management plan for the high-heat tank waste, including neutralized current acid waste (NCAW) in AY and AZ Tank Farms, and tank C-106 waste. The movement of solids, liquids and salt cake in the designated tank farms is included. Decision analysis techniques were used to determine a recommended alternative. The recommended course of action was replacement of a 75-hp mixer pump in tank AY-102 and in-tank concentration of tank AZ-102 supernate. The alternative includes transfer fo tank C-106 sludge to tank AY-102, then transfer to tank AY-102 and tank C-106 sludge to tank AZ-101 using the new 75-hp mixer pump installed in tank AY-102. Tank AZ-101 becomes a storage tank for high-level waste (HLW) sludge, with the capacity to mix and transfer sludge as desired.

  3. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    Science.gov (United States)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  4. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  5. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  6. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  7. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  8. A groundwater management plan for Stuttgart.

    Science.gov (United States)

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  9. From masterplan to a municipal plan of energy utilization; Vom Masterplan zum kommunalen Energienutzungsplan

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, Tobias [Forschungsstelle fuer Energiewirtschaft e.V., Muenchen (Germany)

    2011-07-01

    Municipal plans of energy utilization enable the recognition of the amount and causer of the energy demand in a community or in an administrative district, a more efficient design of energy utilization and an enhanced use of renewable energies. The author of the contribution under consideration reports on the use of the extensive data base of the master plan for a development of plans for energy utilization. In analyzing the current situation, a detailed and spatially resolved presentation of the heat demand and electricity demand in the sectors of housing, industry and trade, commerce and services is performed. The potentials and the expected expansion of renewable energies are shown on the EEG database of the Research Center for Energy Economics (Munich, Federal Republic of Germany). Subsequently, regional targets are defined and derived from the municipal need for action. The municipal need for action can be incorporated into plans for energy utilization.

  10. 75 FR 37883 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2010-06-30

    ... planning processes provide an incumbent transmission owner with an unfair advantage over merchant and... provider with an undue advantage over a nonincumbent transmission developer. Neither incumbent nor... that provides an incumbent utility with an undue advantage over nonincumbent transmission project...

  11. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained

  12. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained prominenc

  13. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  14. KNOWLEDGE MANAGEMENT AND ENTERPRISE RESOURCE PLANNING IMPLEMENTATION: A CONCEPTUAL MODEL

    Directory of Open Access Journals (Sweden)

    Sevenpri Candra

    2014-01-01

    Full Text Available The purpose of this research is examining the influence of organizational learning and knowledge management in enterprise resource planning implementation. This study is based on organizational learning, knowledge management and enterprise resource planning implementation. This research did not test all organizational factors and focus particularly on knowledge management capacity and absorptive capability. Enterprise resource planning implementation successful is a must. In today’s global and competitor in business, enterprise resource planning is becoming one of the main tools to achieve competitiveness in business. Enterprise resource planning is an infrastructure to create and maintain business to improve front-office and back-office efficiency and effectiveness. This study is significant to bring new thinking in determines the key antecedents to successful enterprise resource planning implementation based on knowledge management perspectives and it will helps to understand the key success factor in enterprise resource planning implementation.

  15. SU-E-J-254: Utility of Pinnacle Dynamic Planning Module Utilizing Deformable Image Registration in Adaptive Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Jani, S [Sharp Memorial Hospital, San Diego, CA (United States)

    2014-06-01

    Purpose For certain highly conformal treatment techniques, changes in patient anatomy due to weight loss and/or tumor shrinkage can result in significant changes in dose distribution. Recently, the Pinnacle treatment planning system added a Dynamic Planning module utilizing Deformable Image Registration (DIR). The objective of this study was to evaluate the effectiveness of this software in adapting to altered anatomy and adjusting treatment plans to account for it. Methods We simulated significant tumor response by changing patient thickness and altered chin positions using a commercially-available head and neck (H and N) phantom. In addition, we studied 23 CT image sets of fifteen (15) patients with H and N tumors and eight (8) patients with prostate cancer. In each case, we applied deformable image registration through Dynamic Planning module of our Pinnacle Treatment Planning System. The dose distribution of the original CT image set was compared to the newly computed dose without altering any treatment parameter. Result was a dose if we did not adjust the plan to reflect anatomical changes. Results For the H and N phantom, a tumor response of up to 3.5 cm was correctly deformed by the Pinnacle Dynamic module. Recomputed isodose contours on new anatomies were within 1 mm of the expected distribution. The Pinnacle system configuration allowed dose computations resulting from original plans on new anatomies without leaving the planning system. Original and new doses were available side-by-side with both CT image sets. Based on DIR, about 75% of H and N patients (11/15) required a re-plan using new anatomy. Among prostate patients, the DIR predicted near-correct bladder volume in 62% of the patients (5/8). Conclusions The Dynamic Planning module of the Pinnacle system proved to be an accurate and useful tool in our ability to adapt to changes in patient anatomy during a course of radiotherapy.

  16. Strategic plan for the Northeast Waste Management Enterprise

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The Northeast Waste Management Enterprise (NEWME) is a new form of partnership whose goal is to increase the economic, commercial, and environmental effectiveness of solid waste management (SWM) through implementation of new technologies. Of particular interest to NEWME are technologies that are applicable to the Northeast`s waste management problems and technologies applicable to the Department of Energy`s waste management and environmental clean-up programs. These include land reclamation using bioremediation, pyrolysis, waste stabilization/ash utilization, and landfill containment. The next step, which has already begun, is to evaluate specific technologies within these focus areas. A concurrent economic analysis will take place along with each program, which, together with technical evaluations, will form the basis for decisions relating to the ultimate commercialization of the technology. The financial plan for NEWME anticipates an evolution over time in which the Federal Government provides most of the funding in the early design phase, with some industrial participation. As the program progresses through demonstration and early commercialization, the program becomes more expensive, and a larger fraction of the costs is borne by the private sector. NEWME itself will participate financially in each commercialization vehicle in order to form the basis for the eventual self-sufficient of the program.

  17. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  18. Handy Brake National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Handy Brake National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  19. Forest Management Plan Blackwater National Wildlife Refuge 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan will be geared mainly toward habitat management of refuge woodlands to benefit and/or protect the endangered Bald Eagle and the Delmarva...

  20. Refuge Management Plan, Part III : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR provides an overview of the Management Program. Outputs include endangered species maintenance, waterfowl production, waterfowl...

  1. Management Plan Parts I and II : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR summarizes the refuge objectives, history, resources, land status, and administration of the Refuge. Objectives and management...

  2. Habitat Management Plan Squaw Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  3. Habitat Management Plan for Bogue Chitto National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bogue Chitto NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bogue Chitto NWR,...

  4. Integrated Pest Management Plan for Sand Lake NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Sand Lake WMD. The...

  5. Grassland Management Plan Erie National Wildlife Refuge 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan provides well defined guidelines to accomplish the following goals at Erie National Wildlife Refuge : 1) to manage existing grasslands, 2)...

  6. Bombay Hook National Wildlife Refuge Cropland Management Plan 1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  7. Bombay Hook National Wildlife Refuge Cropland Management Plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  8. Bombay Hook National Wildlife Refuge Cropland Management Plan 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  9. A Timber Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for Mingo National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. A history and...

  10. Pocosin Lakes National Wildlife Refuge : 2002 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2002 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  11. Pocosin Lakes National Wildlife Refuge : 2003 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2003 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  12. Great River & Clarence Cannon National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Great River and Clarence Cannon NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  13. Habitat Management Plan for Logan Cave National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Logan Cave NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Logan Cave NWR, to...

  14. Habitat Management Plan for Tensas River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tensas River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tensas River NWR,...

  15. Habitat Management Plan for St. Marks National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The St. Marks NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at St. Marks NWR, to...

  16. Fire Managment Plan Presquile National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan for Presquile National Wildlife Refuge. It relates to existing land management policy, however, comprehensive...

  17. Forest Management Plan for Bayou Cocodrie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Cocodrie NWR Forest Management Plan provides a long-term vision and specific guidance on managing forest habitat for the resources of concern at Bayou...

  18. Arrowwood National Wildlife Refuge Complex Integrated Pest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arrowwood NWRC. The...

  19. Integrated Pest Management Plan Ouray National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Ouray NWR. The goals...

  20. Arapaho National Wildlife Refuge Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arapaho National...

  1. Louisa District Mark Twain NWR : Grassland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain National Wildlife Refuge- Louisa District Grassland Management Plan addresses management strategies to provide habitat and food for waterfowl and...

  2. Rocky Mountain Arsenal National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Habitat Management Plan identifies important wildlife resources on the Rocky Mountain Arsenal National Wildlife Refuge and the management strategies that will...

  3. Prime Hook National Wildlife Refuge Fire Management Plan 2002

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Department of the Interior fire management policy requires that all national wildlife refuges with vegetation that can sustain fire have a Fire Management Plan...

  4. Big Branch Marsh National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Branch National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  5. Mountain Longleaf National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mountain Longleaf National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  6. Merritt Island National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  7. Cape May National Wildlife Refuge Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan for Cape May National Wildlife Refuge provides the Refuge Manager with one to three year guidance for 1) acquiring or otherwise...

  8. Cameron Prairie National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cameron Prairie National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  9. Integrated Pest Management Plan Browns Park National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Browns Park National...

  10. Habitat Management Plan for Atchafalaya National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Atchafalaya NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Atchafalaya NWR,...

  11. Habitat Management Plan for Roanoke River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Roanoke River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Roanoke River...

  12. Habitat Management Plan for Lake Ophelia National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lake Ophelia NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Lake Ophelia NWR,...

  13. Habitat Management Plan for Delta and Breton National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Delta and Breton NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Delta and...

  14. Modoc National Wildlife Refuge annual water management plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1980, recommended water management for 1981, and...

  15. Modoc National Wildlife Refuge annual water management plan 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1981, recommended water management for 1982, and...

  16. Management Plan : Parts I & II : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parts I and II of the Management Plan for Tamarac NWR summarize the location, history, environment, resources, administration, land status, and current management...

  17. Pocosin Lakes National Wildlife Refuge : 2006 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  18. Pocosin Lakes National Wildlife Refuge : 2004 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  19. Pocosin Lakes National Wildlife Refuge : 2000 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2000 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  20. Pocosin Lakes National Wildlife Refuge : 2001 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2001 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  1. Pocosin Lakes National Wildlife Refuge : 1999 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1999 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  2. Moose/Habitat Management Plan : [Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kenai NWR Moose/Habitat Management Plan was developed to guide future FWS management of moose/habitat on Kenai NWR. The present status and trend of Kenai NWR...

  3. Grassland Management Plan Wertheim National Wildlife Refuge 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan for Wertheim National Wildlife Refuge is presented as an interim document to provide refuge staff in 1989 with management guidelines...

  4. Habitat Management Plan for Black Bayou Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Black Bayou Lake NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Black Bayou...

  5. Habitat Management Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pee Dee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Pee Dee NWR, to...

  6. Habitat Management Plan for Tennessee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tennessee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tennessee NWR, to...

  7. Habitat Management Plan for Bayou Cocodrie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Cocodrie NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Cocodrie...

  8. Rocky Mountain Arsenal National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  9. Habitat Management Plan for Carolina Sandhills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Carolina Sandhills NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Carolina...

  10. Aquatic management plan : [Rocky Mountain Arsenal National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The aquatic management plan for Rocky Mountain Arsenal National Wildlife Refuge (Refuge) provides management direction and guidance to ensure the conservation of...

  11. Integrated Pest Management Plan Medicine Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Medicine Lake NWR. The...

  12. Integrated Pest Management Plan - Fish Springs National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Fish Springs NWR. The...

  13. Fishery Management Plan Kenai National Wildlife Refuge FY 1996 - 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for the Kenai National Wildlife Refuge for the Kenai National Wildlife Refuge provides management direction necessary to ensure...

  14. Panther Swamp National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Panther Swamp National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  15. Fort Niobrara National Wildlife Refuge River Recreation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Fort Niobrara National Wildlife Refuge River Recreation Management Plan is to provide guidance and direction for management of recreational...

  16. Two Ponds National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  17. Habitat Management Plan for Pond Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pond Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  18. Occoquan Bay National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Occoquan Bay National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  19. Habitat Management Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pee Dee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Pee Dee NWR, to...

  20. Bayou Sauvage National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Sauvage NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage...

  1. Habitat Management Plan : Audubon National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Audubon National Wildlife Refuge Complex Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  2. Pocosin Lakes National Wildlife Refuge : 2005 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2005 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  3. Two Rivers National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Two Rivers National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  4. Bon Secour National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bon Secour National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  5. Fishery Management Plan : Ottawa National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Ottawa NWR provides an overview of the relationship between fishery management and Refuge objectives. Wildlife use and production...

  6. Moist Soil Management Plan : Hatchie National Wildlife Refuge : 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This moist soil management plan for Hatchie National Wildlife Refuge covers the 1982 management and manipulation of seasonally flooded wetlands to produce a mudflat...

  7. [Draft] Fishery Management Plan : Valentine National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fishery management plan for Valentine National Wildlife Refuge has objectives and strategies for fish management that are in agreement with the background and...

  8. Wilderness management plan : Monomoy National Wildlife Refuge : Monomoy Wilderness

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Monomoy Wilderness. After introducing the area, it analyzes current management practices against current public...

  9. Bayou Teche National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Teche NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage NWR,...

  10. Cypress Creek National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan (CMP) for Cypress Creek National Wildlife Refuge (NWR) was prepared to guide management direction of the Refuge over the next 15...

  11. Grand Cote National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Grand Cote NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  12. Red River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Red River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  13. Merritt Island National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  14. Agassiz National Wildlife Refuge : Marsh and Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Marsh and Water Management Plan (MWMP) is intended to guide the management of Agassiz NWR wetlands into the twenty-first century. The foundation on which this...

  15. Cahaba River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cahaba River National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  16. D'Arbonne National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The D'Arbonne National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  17. Upper Ouachita National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Ouachita National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  18. John Heinz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The John Heinz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  19. St. Vincent National Wildlife Refuge : Timber Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for St. Vincent National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. Two types...

  20. 77 FR 14568 - Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument...

    Science.gov (United States)

    2012-03-12

    ... analysis for this general management planning effort. SUPPLEMENTARY INFORMATION: This new GMP will update... planning process to date, the NPS planning team developed four preliminary alternatives for the management... National Park Service Environmental Impact Statement for Proposed General Management Plan,...