WorldWideScience

Sample records for management plan 2001-2005

  1. CNES Strategic Plan 2001-2005

    Science.gov (United States)

    Janichewski, S.; Ben Aı̈m, H.

    2004-04-01

    CNES's latest strategic plan defines the French space agency's strategic focus and charts its course for the 2001-2005 timeframe. Based on a vision of how the space sector will evolve over the period up to 2010, the Strategic Plan sets out the agency's ambition for 2005: " CNES—space technology serving society". This ambition is structured around four challenges: Focusing actions on society's needs in three areas where space technology can make a major difference—environment, science and the information society and mobility. Building the foundation for success by ensuring competitive access to space and boosting basic research and technological innovation. Strengthening national and European synergies to ensure complementarity between: the ESA European framework, which is well adapted for major projects and the development of a European Space Strategy (ESS); and the national framework to support activities of national responsibility such as defence, science and technology development, and to improve competitiveness through direct international cooperation with other space agencies. Forging effective partnerships with its research and industry partners in Europe and France to enhance performance by: developing a service culture; building partnerships; concentrating on core competencies where it can most add value; improving skills and responsiveness in line with its strategic position; ensuring transparent and rigorous management of public funds. This Strategic Plan will be implemented in the 2001-2005 timeframe at all management levels. Implementation will be eased by the fact that the plan has been drawn up through a specific process designed to make internal management aware of the analysis underlying it. This will ensure that all stakeholders understand and appropriate the plan's orientations and thus play an active role in CNES' development. This process involved five successive steps: shared assessment of the space sector's evolution, providing a common

  2. Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  3. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  4. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  5. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  6. Savannah River Site FY 2001 Spent Nuclear Fuel Integrated Management Plan

    International Nuclear Information System (INIS)

    Dunsmuir, M.D.

    2000-01-01

    This document presents the SRS integrated near and long-term plans (FY 2001 through 2035) for the safe life cycle management of SNF inventories and other SFSD legacy material programs/projects that impact this mission until final disposition has been implemented

  7. Lokasi Dan Kelompok Teater Indonesia 2001-2005 (Analisis Rubrik Teater Majalah Tempo

    Directory of Open Access Journals (Sweden)

    Nurhadi Nurhadi

    2010-06-01

    Full Text Available Artikel ini bertujuan mendeskripsikan kelompok-kelompok teater yang berkecimpung dalam pementasan teater di Indonesia dan peta lokasi pementasan sebagaimana diulas dalam majalah Tempo tahun 2001-2005. Hasil penelitian ini menunjukan kelompok teater yang paling konsisten dalam mementaskan suatu naskah setiap tahunnya adalah Teater Koma. Kelompok teater berikutnya yang relatif banyak berkiprah dari tahun 2001-2005 berdasarkan artikel rubrik teater Tempo yaitu Teater Mandiri, Teater Garasi, dan Actors Unlimited Bandung. Kelompok teater pada jajaran berikutnya yang mementaskan lebih dari satu kali pada periode 2001-2005, yaitu Teater Gandrik, Bengkel Teater, dan Mainteater Jakarta. Lokasi pementasan teater selama 2001-2005 berdasarkan rubrik teater majalah Tempo sebagian besar berlangsung di berbagai gedung teater di Jakarta. Perbandingan jumlah lokasi pertunjukannya adalah sebagai berikut: Jakarta (50 pementasan, Yogyakarta (6 pementasan, Surakarta (2 pementasan dan Bandung (1 pementasan. Abstract: This article aims to describe the theater groups being active in theater performances in Indonesia and the performance location map as reviewed in Tempo magazine in 2001-2005. The research result has shown that the most consistent theater group in performing a script each year is Teater Koma. The next group which have relatively many performances in 2001-2005 according to Tempo’s articles are Teater Mandiri, Teater Garasi, and Actors Unlimited Bandung. The next level groups which have more than one performance in 2001-2005 are Teater Gandrik, Bengkel Teater, and Mainteater Jakarta. The theater performance locations in 2001-2005, according to Tempo’s articles, mostly took place in Jakarta’s theater houses. The ratio of performance locations amount is as follows: Jakarta (50 performances, Yogyakarta (6 performances, Surakarta (2 performances, and Bandung (1 performance. Key Words: theater performance location, theater group, Tempo magazine

  8. Cesarean section rates and indications at our clinic between 2001 and 2005

    Directory of Open Access Journals (Sweden)

    Ertan Uzun

    2006-12-01

    Full Text Available OBJECTIVE: Cesarean section has increased risks for maternal mortality and morbidity, and perinatal morbidity. The purpose of this study was to analyze the annual distribution of indications and rates of cesarean sections in all deliveries that happened between 2001 and 2005.\tMATERIAL-METHODS: We evaluated retrospectively the hospital records of 1806 patients who underwent cesarean section among 2416 deliveries at Suleyman Demirel University, School of Medicine, Department of Obstetrics and Gynecology, between 2001- 2005. The annual distribution of patients with cesarean section were analyzed with respect to age, parity, vaginal birth rate and cesarean section indications.\tRESULTS: The rate of cesarean section is between 58.1% and 85.2%. This rate increased by years. The most increased indications of cesarean section were previous cesarean, cephalo-pelvic disproportion, and fetal distress. While the rate of previous cesarean\twas 18.3 % in 2001, it increased to 29.6 % in 2005. In a same manner, the rates of cephalo-pelvic disproportion was raised from 2.8% to 21.4%.. The indications of fetal distress and desire of contraception were decreased during this period (p CONCLUSION: The cesarean rate has increased by years in our clinic. This increase was attributed to the increased rate of previous cesarean section, the increased number of primigravid women over 35 year old, and the management of breech presentations. The widespread use of antenatal diagnostic techniques also caused an increase in the rate of cesarean section.

  9. AAPCC database characterization of native U.S. venomous snake exposures, 2001-2005.

    Science.gov (United States)

    Seifert, Steven A; Boyer, Leslie V; Benson, Blaine E; Rogers, Jody J

    2009-04-01

    Differences in victim demographics, clinical effects, managements, and outcomes among native viperid (rattlesnake, copperhead, and cottonmouth) and elapid (coral snake) species have not been systematically characterized. The database of the American Association of Poison Control Centers from 2001 through 2005 was analyzed. Between 2001 and 2005, there were 23,676 human exposures (average = 4,735/year) to native venomous snakes in the United States reported to U.S. poison centers in all states except Hawaii: 98% were to viperid snakes and 2% to elapids. Overall, 77% of victims were male, 70% were adults >20 years, and 12% were aged less than 10 years. Sixty-five cases involved pregnant women, with rattlesnake bites resulting in moderate or greater effects in over 70%. The overall hospital admission rate was 53%. Outcomes were generally more severe with rattlesnake and copperhead envenomations and in children <6 years of age. The fatality rate of reported cases was 0.06%. Native U.S. venomous snakebite results in considerable morbidity and mortality. Rattlesnake and copperhead envenomations, and those in children <6 years of age, produce the most severe outcomes, but coral snakebites result in similar hospital admission rates.

  10. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.

    2000-10-01

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  11. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  12. Burlington Bottoms wildlife mitigation site : five-year habitat management plan, 2001-2005

    International Nuclear Information System (INIS)

    Beilke, Susan G.

    2001-01-01

    Historically the lower Columbia and Willamette River Basins were ecologically rich in both the habitat types and the species diversity they supported. This was due in part to the pattern of floods and periodic inundation of bottomlands that occurred, which was an important factor in creating and maintaining a complex system of wetland, meadow, and riparian habitats. This landscape has been greatly altered in the past 150 years, primarily due to human development and agricultural activities including cattle grazing, logging and the building of hydroelectric facilities for hydropower, navigation, flood control and irrigation in the Columbia and Willamette River Basins. The Burlington Bottoms (BB) wetlands contains some of the last remaining bottomlands in the area, supporting a diverse array of native plant and wildlife species. Located approximately twelve miles northwest of Portland and situated between the Tualatin Mountains to the west and Multnomah Channel and Sauvie Island to the east, the current habitats are remnant of what was once common throughout the region. In order to preserve and enhance this important site, a five-year habitat management plan has been written that proposes a set of actions that will carry out the goals and objectives developed for the site, which includes protecting, maintaining and enhancing wildlife habitat for perpetuity

  13. Burlington Bottoms Wildlife Mitigation Site : Five-Year Habitat Management Plan, 2001-2005, 2000-2001 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beilke, Susan G.

    2001-09-01

    Historically the lower Columbia and Willamette River Basins were ecologically rich in both the habitat types and the species diversity they supported. This was due in part to the pattern of floods and periodic inundation of bottomlands that occurred, which was an important factor in creating and maintaining a complex system of wetland, meadow, and riparian habitats. This landscape has been greatly altered in the past 150 years, primarily due to human development and agricultural activities including cattle grazing, logging and the building of hydroelectric facilities for hydropower, navigation, flood control and irrigation in the Columbia and Willamette River Basins. The Burlington Bottoms (BB) wetlands contains some of the last remaining bottomlands in the area, supporting a diverse array of native plant and wildlife species. Located approximately twelve miles northwest of Portland and situated between the Tualatin Mountains to the west and Multnomah Channel and Sauvie Island to the east, the current habitats are remnant of what was once common throughout the region. In order to preserve and enhance this important site, a five-year habitat management plan has been written that proposes a set of actions that will carry out the goals and objectives developed for the site, which includes protecting, maintaining and enhancing wildlife habitat for perpetuity.

  14. LBNL Institutional Plan, FY 1996--2001. Draft

    International Nuclear Information System (INIS)

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions

  15. LBNL Institutional Plan, FY 1996--2001. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  16. Astronautics and Aeronautics: A Chronology, 2001-2005

    Science.gov (United States)

    Ivey, William Noel; Lewis, Marieke

    2010-01-01

    This report is a chronological compilation of narrative summaries of news reports and government documents highlighting significant events and developments in U.S. and foreign aeronautics and astronautics. It covers the years 2001 through 2005. These summaries provide a day-by-day recounting of major activities, such as administrative developments, awards, launches, scientific discoveries, corporate and government research results, and other events in countries with aeronautics and astronautics programs. Researchers used the archives and files housed in the NASA History Division, as well as reports and databases on the NASA Web site.

  17. ANSTO Strategic Plan 2000/2001 - 2004/2005

    International Nuclear Information System (INIS)

    2001-01-01

    This new five-year plan outlines strategies to prepare ANSTO for the opportunities provided by the replacement research reactor, building on the successes of its predecessor plan in reforming the organisation.The Strategic Plan focuses on the innovation process itself as a driver of future prosperity. It embodies the Commonwealth Government's emphasis on an outputs and outcomes framework to deliver results, and to further strengthen accountability in light of the significant research investment at ANSTO. A balanced Scorecard approach of driving strategic and business processes through four different perspectives will ensure the efficient achievement of relevant results. ANSTO is responsible for delivering specific scientific services and products to government, industry, academia and other research organisations. Activities are grouped into five externally focused core business areas.These are the areas through which ANSTO will develop new knowledge, deliver quality services, support business opportunities and ensure that nuclear science and technology and related capabilities provide an innovative impetus to benefit society. A separate internal stream provides support for organisational development. The challenge of the next five years is to streamline the innovation process to improve delivery of results. ANSTO is a knowledge-based organisation with the major strengths being its people, a multidisciplinary approach to its operation, and its facilities.Through a collaborative effort driven by this strategic plan, ANSTO will be able to deliver new and exciting outcomes that can be put into practice by participants and clients across Australia. ANSTO's strategic direction, as presented in this plan, is owned by the Board and staff

  18. Application of BET_EF at Mount Etna: a retrospective analysis (years 2001-2005

    Directory of Open Access Journals (Sweden)

    Jacopo Selva

    2011-12-01

    Full Text Available Advances in volcano monitoring and forecasting need a multidisciplinary collaborative framework. In light of this, a Bayesian Event Tree (BET approach was performed by the application of the BET for Eruption Forecasting (BET_EF code to analyze the space-time distribution of the volcanic activity of Mount Etna from 2001-2005. First, a reliable monitoring dataset was set up after some sessions to elicit geophysical, volcanological and geochemical ‘precursor’ parameters. A constant unrest probability of 100%, with a magma involvement usually greater than 95%, was computed throughout the time period analyzed. Eruption probabilities higher than 90% were estimated a few days before the onsets of the 2001 and 2002-2003 flank eruptions. Values slightly higher than 75% were observed during the lava fountaining period in June-July 2001. However, the probabilities flattened to around 30% for the 2004-2005 flank eruption. With suitable data, a good depiction of the actual location of the eruptive scenario for the 2001 and 2002-2003 events was provided. Conversely, the size of the eruptions was not indicated.

  19. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  20. 40 CFR 60.2055 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  1. A patient survey of nursing practice philosophy in 2001 and 2005.

    Science.gov (United States)

    Noble, Helen; Bradley, Ruth; Freed, Naomi

    The nursing philosophy group at St Bartholomew School of Nursing and the London NHS Trust came together to review the existing nursing philosophy, which had been in place since 1996. A new philosophy was circulated in June 2000 and it was viewed as essential that this document be reviewed regularly in response to patient needs. A patient survey was produced to assess patients' understanding of the philosophy and how it related to their inpatient stay. It was an important management tool, which enabled the development of patient-centred nursing based on real patient experience. The philosophy was updated in 2003 and the patient survey has since been repeated in 2005. Results have been delivered back to the Trust's Nursing Policy Board and action plans have been agreed based on the results of the survey in 2005 within the Trust's shared governance framework.

  2. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  3. Management system - PNS ISO/IEC 17025:2005

    International Nuclear Information System (INIS)

    Baje, Perla F.

    2009-01-01

    Management system is a set of policies, processes and procedures needed for planning and execution in the core business area of the organization. It is a set of policies and objectives to direct and control an organization with regard to quality. ISO 17025:2005 is the administrative and technical systems that govern the operations of the laboratory

  4. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. Comprehensive College Plan for 2000-2001.

    Science.gov (United States)

    San Antonio Coll., TX.

    The document describes San Antonio College's (Texas) strategic goals and objectives for 2000-2001. San Antonio College's comprehensive planning and evaluation process monitors the achievement of college-wide goals and initiatives supporting the college's Vision and Mission Statement and the Alamo Community College District's Strategic Plan. The…

  7. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  8. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  9. 2001 Toxic Chemical Release Inventory Emergency Planning and Community Right to Know Act SEC 313

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    2002-01-01

    Pursuant to section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA), and Executive Order 13148, Greening the Government Through Leadership in Environmental Management, the US Department of Energy has prepared and submitted a Toxic Chemical Release Inventory for the Hanford Site covering activities performed during calendar year 2001. EPCRA Section 313 requires facilities that manufacture, process, or otherwise use listed toxic chemicals in quantities exceeding established threshold levels to report total annual releases of those chemicals. During calendar year 2001, Hanford Site activities resulted in one chemical used in amounts exceeding an activity threshold. Accordingly, the Hanford Site 2001 Toxic Chemical Release Inventory, DOE/RL-2002-37, includes total annual amount of lead released to the environment, transferred to offsite locations, and otherwise managed as waste

  10. Plan de implementación de un SGSI acorde a la norma ISO/IEC 27001:2005

    OpenAIRE

    Álvarez Verdugo, Joaquín

    2014-01-01

    Plan de implementación de un SGSI acorde a la norma ISO/IEC 27001:2005 en un organismo público municipal. Pla d'implementació d'un SGSI d'acord amb la norma ISO/IEC 27001:2005 en un organisme públic municipal. Master thesis for the ICT Security management program.

  11. Powernext Day-AheadTM statistics April 30, 2005

    International Nuclear Information System (INIS)

    2005-04-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the April 30, 2005 update of Powernext Day-Ahead TM statistics: traded volumes and average prices from November 2001 to April 2005, monthly overview from April 2004 to April 2005 (volumes, prices and price spreads), weekly overview from January to April 2005, daily and hourly overview and market resilience for April 2005, power consumption in March and April 2005 (average consumption, average forecasted consumption and average price on Powernext Day-Ahead TM ), power consumption on the French hub from January to April 2005 and Powernext Day-Ahead TM prices, transfer capacities in April 2005 (daily capacity allocations for France-Germany, France-Switzerland and France-Spain, daily and monthly capacity allocations for France-Belgium, auction on the France-UK Interconnector, daily and yearly capacity allocation for France-Italy), temperature variations in France from November 2004 to April 2005 and average prices on Powernext Day-Ahead TM , and balancing mechanism for March-April 2005 (half-hourly imbalance settlement prices). (J.S.)

  12. [Analysis of citations and national and international impact factor of Farmacia Hospitalaria (2001-2005)].

    Science.gov (United States)

    Aleixandre-Benavent, R; González Alcaide, G; Miguel-Dasit, A; González de Dios, J; de Granda Orive, J I; Valderrama Zurián, J C

    2007-01-01

    The objective of this study is to analyse the citation patterns and impact and immediacy indicators of the Farmacia Hospitalaria journal during the period 2001-2005. An analysis of citations chosen from 101 Spanish health science journals was carried out in order to determine the citing and cited journals and the national and international impact and immediacy indicators. A similar methodology used by Thomson ISI in Science Citation Index (SCI) and Journal Citation Reports (JRC) was applied. Farmacia Hospitalaria made 1,370 citations to 316 different journals. The percentage of self-citations was 9%. The national impact factor increased from 0.178 points in 2001 to 0.663 points in 2005 while the international impact factor increased from 0.178 to 0.806 for the same period. The analysis of citation patterns demonstrates the multidisciplinary nature of Farmacia Hospitalaria and a significant growth in the impact indicators over recent years. These indicators are higher than those of some other pharmacy journals included in Journal Citation Reports. Self-citation was not excessive and was similar to that of other journals.

  13. MANAGEMENT BOARD - MEETING OF 27 SEPTEMBER 2001

    CERN Multimedia

    2001-01-01

    Outcome of the September Meetings of the Scientific Policy Committee, Finance Committee, Committee of Council and Council The Director-General reported on two of the main items examined by the Council and its bodies in the week beginning 17th September. First, following a series of discussions at the various committees over several months, the Council had taken note of a document defining the global LHC Computing Grid project and had approved the annexed proposal relating to Phase 1 in an extraordinary session convened for that purpose. Phase 1 covers the development and prototyping activities to be carried out at CERN and in the Member and non-Member States from 2001 to 2004, prior to installation and operation of the full world-wide initial production Grid system in the years 2005 to 2007 (Phase 2). As well as laying down the scope and goals of the Project, the document submitted to the Council describes the additional resource requirements at CERN and a plan to finance them through special contributions fr...

  14. CHILDHOOD GUILLIAN-BARRE SYNDROME IN THE IRAN’S EAST AZERBAIJAN PROVINCE: 2001-2005

    OpenAIRE

    M. Barzegar; S. Davari Farid; S. Dastgiri; A. Malekian; V. Toopchizadeh

    2008-01-01

     ObjectiveThis study aims at determining the epidemiologic, presenting symptoms, clinical course and electrophysiologic features of childhood Guillain-Barre Syndrome (GBS) in the East Azarbaijan province over a period of five years.Materials & Methods All the patients, aged< 15 years, referred/admitted to Tabriz Children Hospital with GBS between January 2001 and December 2005 were investigated.ResultsOne hundred and twelve subjects were enrolled during this period. The average annual inciden...

  15. Powernext futures statistics - August 31, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the August 31, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for August 2005, base-load and peak-load contracts overview from March 2005 to August 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in August 2005 (average bid ask spread and availability). (J.S.)

  16. Powernext futures statistics - December 31, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the December 31, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for December 2005, base-load and peak-load contracts overview from July 2005 to December 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in December 2005 (average bid ask spread and availability). (J.S.)

  17. Powernext futures statistics - November 30, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the November 30, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for November 2005, base-load and peak-load contracts overview from June 2005 to November 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in November 2005 (average bid ask spread and availability). (J.S.)

  18. A Management Plan for Historic Bridges in Virginia : The 2017 Update

    Science.gov (United States)

    2018-04-01

    A Management Plan for Historic Bridges in Virginia, published in 2001, identified the management and treatment needs for 55 historic bridges in Virginia (i.e., bridges that were individually eligible for or listed on the National Register of Historic...

  19. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  20. For information MANAGEMENT BOARD MEETING OF 26 APRIL 2001

    CERN Document Server

    2001-01-01

    The Management Board's meeting on 26 April was essentially devoted to discussion of the Organization's medium-term plan, to be set out in the document 'Scientific Activities of CERN and Budget Estimates for the Years 2002-2005' and presented to the Council and its committees for approval in June, after submission of a preliminary draft to the Scientific Policy Committee (SPC) at its meeting on 7 May. The Director-General reviewed the main changes with respect to last year's plan and indicated that the document would take into account a number of significant developments over the past twelve months, which had enabled the Management to build up a much clearer picture of the Laboratory's medium-term future. These included the final closure of LEP, the completion of the Five-Yearly Remuneration Review, the elaboration of a LHC final machine and detector commissioning schedule, and, more recently, the completion of the LHC Computing Review. The conclusions and recommendations of the latter review would be presente...

  1. Internet cigarette purchasing among 9th grade students in western New York: 2000-2001 vs. 2004-2005.

    Science.gov (United States)

    Fix, Brian V; Zambon, Margaret; Higbee, Cheryl; Cummings, K Michael; Alford, Terry; Hyland, Andrew

    2006-09-01

    To assess trends and correlates of youth cigarette purchasing behavior on the Internet. In 2000-2001, Roswell Park Cancer Institute conducted a survey asking 7,019 ninth grade students in Erie and Niagara Counties in New York State about their tobacco use and purchasing habits, including use of the Internet to buy cigarettes. The 2004-2005 survey is a replication of the 2000-2001 survey. Both surveys used an anonymous, self-administered questionnaire survey. These data were combined in order to examine trends in youth smoking behavior. Students surveyed in 2004-2005 were 2.6 times more likely (95% CI: 1.5, 4.6) to have purchased cigarettes over the Internet in the 30 days prior to the survey than those surveyed in 2001 (5.2% to 1.6%); however, the intention to use the Internet as a cigarette source in the future did not change between survey periods. Youth online cigarette purchasing has increased but intention to use the Internet to purchase cigarettes in the future has remained the same, suggesting that this trend may be reaching a plateau. Recent public efforts to reduce online cigarette sales will need to be evaluated in order to determine which policy or combination of policies are most effective.

  2. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  3. Trends in rooting media in Dutch horticulture during the period 2001-2005: The new growing media project

    NARCIS (Netherlands)

    Blok, C.; Verhagen, J.B.G.M.

    2009-01-01

    An overview of the developments in the area and volume of substrates used for horticultural rooting media in Holland in the period 2001 to 2005 is given. The overview is followed by a discussion of some trends in society and technology including the interest of public and society in a possible

  4. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  5. Oak woodland conservation management planning in southern CA - lessons learned

    Science.gov (United States)

    Rosi Dagit

    2015-01-01

    The California Oak Woodlands Conservation Act (AB 242 2001) established requirements for the preservation and protection of oak woodlands and trees, and allocated funding managed by the Wildlife Conservation Board. In order to qualify to use these funds, counties and cities need to adopt an oak conservation management plan. Between 2008 and 2011, a team of concerned...

  6. Câncer cutâneo em Taubaté (SP - Brasil, de 2001 a 2005: um estudo de prevalência Skin cancer in Taubaté (SP - Brazil, from 2001 to 2005: a prevalence study

    Directory of Open Access Journals (Sweden)

    Flávia Regina Ferreira

    2008-08-01

    Full Text Available FUNDAMENTOS: O câncer figura como a terceira principal causa de morte no Brasil. A pele é a localização mais freqüente, e estima-se que cerca de 50% das pessoas brancas com mais de 60 anos desenvolverão algum tipo de neoplasia cutânea. OBJETIVO: Descrever o perfil dos indivíduos com câncer da pele atendidos no Hospital Universitário de Taubaté no período de 2001 a 2005. MÉTODOS: Estudo transversal de base hospitalar envolvendo indivíduos atendidos no Serviço de Dermatologia do Hospital Universitário de Taubaté no período de janeiro de 2001 a dezembro de 2005. As variáveis do estudo foram sexo, idade, cor da pele, localização e tipo clínico do tumor: carcinoma basocelular, carcinoma espinocelular, combinado e melanoma. As técnicas estatísticas utilizadas foram a do qui-quadrado, t de Student e Anova. RESULTADOS: Foram incluídos no estudo 639 indivíduos, e a prevalência encontrada foi de 50 casos/100.000 habitantes. A faixa etária mais acometida foi a partir dos 60 anos, a proporção de indivíduos acometidos foi maior para o sexo feminino em relação ao masculino (57,2%/42,8% e a proporção de brancos/não brancos foi de 4:1. CONCLUSÃO: Este trabalho vem preencher uma lacuna, dada a inexistência de estudos na região e também à escassez de estudos no Estado de São Paulo, e os achados foram coincidentes com os da literatura.BACKGROUND: Cancer represents the third principal cause of death in Brazil. Skin is the most frequent location and about 50% of caucasian patients older than sixty years will develop some type of cutaneous cancer. OBJECTIVE: To describe the profile of the individuals with skin cancer assisted at the University Hospital of Taubaté in the period between 2001 and 2005. METHODS: A hospital-based cross-sectional study involving individuals assisted at the Dermatology Department at the University Hospital of Taubaté in the period between January 2001 to December 2005 was performed. Study

  7. Subnotificação de acidentes por animais peçonhentos registrados pelo SINAN no Estado do Rio de Janeiro no período de 2001 a 2005 Underreporting of accidents with venomous animals registered by SINAN in the State of Rio de Janeiro from 2001 to 2005

    Directory of Open Access Journals (Sweden)

    Judith Tiomny Fiszon

    2008-03-01

    Full Text Available Com o objetivo de verificar se o Sistema de Informação de Agravos de Notificação (SINAN já permite prescindir de sistemas de informação paralelos voltados ao controle da distribuição do soro, essencial ao atendimento das vítimas de acidentes por animais peçonhentos, foram comparados os dados dos acidentes causados por serpentes, aranhas e escorpiões, disponibilizados pelo SINAN para o Estado do Rio de Janeiro, com os registrados pela Secretaria de Estado de Saúde do Rio de Janeiro (SES-RJ, de 2001 a 2005. Constatou-se o aumento da capacidade do SINAN para registrar os acidentes e a existência de discrepâncias de dados em municípios e regiões do Estado. Foi especialmente alta a subnotificação de acidentes ofídicos pelo SINAN. Discute-se as implicações desse resultado para estudos e pesquisas, bem como para o planejamento e a gestão dos serviços e distribuição dos soros, e conclui-se que ainda não é possível prescindir dos dados da SES-RJ.This article has the objective of determining if the Disease Reporting Information System (SINAN of the State of Rio de Janeiro, Brazil, is adequate enough to do without corresponding information systems directed to serum distribution control, essential to provide care to victims of venomous animals. With this purpose, we compared data of accidents caused by snakes, spiders and scorpions reported to the State Health Department of Rio de Janeiro and those registered in the SINAN from 2001 to 2005. We found an increase in the number of cases reported to SINAN and disagreements in data from municipalities and regions of the State. More specifically, we noticed high underreporting of snake accidents in the SINAN. This paper addresses the implications of these results for studies and research, as well as for planning and management of healthcare services and serum distribution. The conclusion is that it is not possible to rule out data from the Rio de Janeiro State Health Department for

  8. Increasing effect of body weight perception on suicidal ideation among young Korean women: Findings from the Korea National Health and Nutrition Examination Survey 2001 and 2005

    Directory of Open Access Journals (Sweden)

    Dong-Sik Kim

    2011-01-01

    Full Text Available Dong-Sik KimDepartment of Gender Equality and Social Cohesion Research, Korean Women's Development Institute, Seoul, Republic of KoreaObjective: To examine the prevalence of actual and perceived overweight and to compare the mediating effect of perceived overweight on the relationship between actual overweight and suicidal ideation among young Korean women between 2001 and 2005.Methods: Data were gathered from the 2001 and 2005 Korean National Health and Nutrition Examination Surveys involving a nationally representative sample of young women (568 in 2001 and 385 in 2005 aged 20–29 years.Results: Over the 5-year period, the prevalence of actual overweight (body mass index ≥23 kg/m2 and perceived overweight increased by 10.5% and 22.8%, respectively. The discrepancy between actual and perceived body weights was much wider in 2005 than in 2001. After controlling for covariates (age, marital status, educational attainment, employment status, smoking status, alcohol consumption, and regular exercise, overweight women were more likely to think about suicide than their normal-weight counterparts in both periods. However, in both periods, the association between overweight and suicidal ideation became nonsignificant when perceived weight was considered. In both periods, a self-perception of overweight was associated with an increased risk of suicidal ideation, but the association was much stronger in 2005 than in 2001.Conclusion: This study suggests a need for educational programs or effective treatments to help young women who perceive themselves as overweight to reduce the potential risk of suicidal ideation in later life.Keywords: body mass index, perceived body weight, body weight, body image, suicidal ideation 

  9. NERSC 2001 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Hules, John (editor)

    2001-12-12

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005.

  10. NERSC 2001 Annual Report; ANNUAL

    International Nuclear Information System (INIS)

    Hules, John

    2001-01-01

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005

  11. 2005 HI Office of Planning Lidar: Kilauea Crater

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The State of Hawaii Planning Office contracted the Airborne 1 Corporation to collect, process and deliver several areas in Hawaii in the later part of 2005. 3,000...

  12. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  13. Evolution of Sustainability in American Forest Resource Management Planning in the Context of the American Forest Management Textbook

    Directory of Open Access Journals (Sweden)

    Thomas J. Straka

    2009-10-01

    Full Text Available American forest resource management and planning goes back to the European roots of American Forestry. Timber management plans, documents based on forest regulation for timber production, were the foundation of American forestry. These types of management plans predominated until World War II. Multiple use forestry developed after World War II and issues like recreation, wildlife, water quality, and wilderness became more important. In the 1970’s harvest scheduling became part of the planning process, allowing for optimization of multiple goals. By 2001 social, environmental, and economic goals were integrated into the timber production process. American forestry experienced distinct historical periods of resource planning, ranging from classic sustained yield timber production, to multiple use-sustained yield, to sustainable human-forest systems. This article traces the historical changes in forest management planning philosophy using the forest management textbooks of the time. These textbooks provide insight into the thought process of the forestry profession as changes in the concept of sustainability occurred.

  14. Metro Vancouver air quality management plan : progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-10-15

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs.

  15. Metro Vancouver air quality management plan : progress report

    International Nuclear Information System (INIS)

    2008-10-01

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs

  16. Managing water to protect fish: A review of California's environmental water account, 2001-2005

    Science.gov (United States)

    Brown, L.R.; Kimmerer, W.; Brown, R.

    2009-01-01

    The Sacramento-San Joaquin Delta, the landward reach of the San Francisco Estuary, provides habitat for threatened delta smelt, endangered winter-run Chinook salmon, and other species of concern. It is also the location of huge freshwater diversion facilities that entrain large numbers of fish. Reducing the entrainment of listed fishes into these facilities has required curtailment of pumping, reducing the reliability of water deliveries. We reviewed the first 5 years (2001-2005) of the Environmental Water Account (EWA), a program instituted to resolve conflicts between protecting listed fishes and providing a reliable water supply. The EWA provided fishery agencies with control over 0.2-0.4 km3 of water to be used for fish protection at no cost to users of exported water, and fish agencies guaranteed no disruption of water supply for fish protection. The EWA was successful in reducing uncertainty in water supply; however, its contribution to the recovery of listed fishes was unclear. We estimated the effectiveness of the EWA to be modest, increasing the survival of winter-run Chinook salmon by 0-6% (dependent on prescreen mortality), adult delta smelt by 0-1%, and juvenile delta smelt by 2-4%. Allocating EWA water for a single life stage of one species could provide larger gains in survival. An optimally allocated EWA of equal size to the median of the first 5 years could increase abundance of juvenile delta smelt up to 7% in the springs of dry years. If the EWA is to become a long-term program, estimates of efficacy should be refined. If the program is to be held accountable for quantitative increases in fish populations, it will be necessary to integrate scientific, possibly experimental, approaches. ?? 2008 Springer Science+Business Media, LLC.

  17. Nuclear waste management in Finland. Final report of public sector's research programme JYT2001 (1997-2001)

    International Nuclear Information System (INIS)

    Rasilainen, K.

    2002-05-01

    According to Finnish nuclear energy legislation, each producer of nuclear waste is responsible for the safe handling, management, and disposal of its waste, as well as for the costs arising. The Posiva company, owned by the nuclear energy-producing power companies, is in charge of spent nuclear fuel management in Finland. The authorities supervise the management of nuclear waste and issue regulations for this purpose. In these demanding tasks the authorities have been supported by the Public Sector's Research Programme on Nuclear Waste Management (JYT2001). The objective of JYT2001 was to provide the authorities with independent expertise and research results relevant to the safety of nuclear waste management. Emphasis was placed on the geological disposal of spent nuclear fuel. The research area was divided into (1) technical studies on the safety of spent fuel disposal, and (2) social science studies related to nuclear waste management. The technical studies covered bedrock behaviour, the hydrogeology and geochemistry of the bedrock, the stability of the bentonite buffer, and the migration of radionuclides in the bedrock. In addition, performance assessment methodology was covered, as well as waste management technologies and costs. The social science studies were focussed on observing the Decision in Principle (DiP) process including the Environmental Impact Assessment (EIA), and media issues related to the spent fuel disposal facility. JYT2001 provided considerable support to the authorities in helping them deal with technical and social science questions. The Government's positive Decision in Principle (DiP) on Posiva's application for a spent fuel disposal facility in Eurajoki was ratified by Parliament in May 2001. The existence of a credible JYT2001 programme, independent of Posiva, obviously contributed to the high level of public confidence in the Finnish nuclear waste management programme. According to the schedule of the Finnish nuclear waste management

  18. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    , cost, and schedule. The NIF Director controls the NNDP Interim Management Plan. A Draft Program Execution Plan (PEP) for the National NIF Diagnostics Program has been also been prepared (NIF-0072083, Oct 2001, attached as Attachment 1) that describes the NNDP technical, cost, and schedule baselines, the method by which the NNDP will fund and monitor the work to be done by the participating laboratories; the process for controlling changes; and the associated reporting and review process. This plan is expected to be approved by the relevant stakeholders at the appropriate time; however, since October 2001, the NNDP has been operating according to the processes laid out in the draft PEP. Below is a summary of the most important aspects of the NNDP that are being applied during this interim period before approval of the full PEP

  19. Forecasting the demand on solar water heating systems and their energy savings potential during the period 2001-2005 in Jordan

    International Nuclear Information System (INIS)

    Kablan, M.M.

    2003-01-01

    Jordan is an example of a developing country that depends almost exclusively on imported oil. Luckily, Jordan is blessed with good solar energy resources. However, only 24% of Jordanian families are installing solar water heating systems (SWHS). The objective of this research is to forecast the yearly demand on SWHS by the household sector during the period 2001-2005 and to compute the potential energy savings throughout the investigated period due to the use of SWHS. It is found that the net energy collected over the entire investigated period is about 1454.4 million kW h. In addition, the capital savings over the entire investigated period is estimated to be 46.28 million US$ if SWHS are used to heat water instead of the commonly used LPG gas cookers. The results of the research may assist decision makers in the energy sector to implement more comprehensive plans that encourage more families to install SWHS and save on imported oil

  20. Corporate plan 1997/98 to 2001/02

    International Nuclear Information System (INIS)

    1997-01-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970 with functions concerning the protection of people from radiation hazards. Members of the Board are appointed by the Health Ministers. Officers and employees of the Board are responsible to it for executing the functions. The Board produces a Corporate Plan which is presented to the Department of Health, its sponsoring Department. This is the Corporate Plan for 1997/98 and the subsequent four years to 2001/02. It follows from discussions with Government Departments and other customers and reflects Ministerial priorities. It also takes into account the recommendations of the recent Cabinet Office publication on Objective Setting and Monitoring in Executive Non-Departmental Public Bodies prepared by the Efficiency Unit. And it reflects the outcome of the recent Prior Options Review of the Board. The main purposes of the Corporate Plan are to describe the broad programme of work for the planning period and the manner in which it is to be implemented, to identify the strategic and specific objectives, and to make the necessary financial forecasts. (author)

  1. Management of the mass casualty from the 2001 Jos crisis | Ozoilo ...

    African Journals Online (AJOL)

    Background: We report our experience in the hospital management of mass casualty following the Jos civil crisis of 2001. Materials and Methods: Aretrospective analysis of the records of patients managed in the Jos civil crisis of September 2001, in Plateau State, Nigeria. Information extracted included demographic data of ...

  2. Enova results report 2005; Enova resultatrapport 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    In 2005 Enova entered into agreements with 186 projects that together provided an energy result of 2 TWh. The result is almost evenly divided between projects providing higher energy production and projects that reduce energy use. The energy production consists of 585 GWh in new wind power and 409 GWh in new heat energy in 2005. Overall for the period 2001 to 2005, Enova contracted for energy results of well over 6.6 TWh. Enova is doing well in relation to the objectives set for its activities.

  3. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  4. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-04-16

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State.... ``Improving Air Quality with Economic Incentive Programs,'' EPA- 452/R-01-001, January 2001. B. Does the rule...

  5. Plans for the NKS-program 1998-2001

    International Nuclear Information System (INIS)

    Bennerstedt, T.

    1999-08-01

    The present report is a comprehensive compilation of the adopted NKS project plans for the sixth four-year period, 1998-2001. Most of the plans are in English. One is in both English and Danish. One is in Norwegian, with a brief summary in English. Only two of the six appendices are in English. In spite of this, it is believed that the report will serve as a valuable source of information not only to those actually active in or closely following the NKS work, but also the international scientific community, e.g., within EU and in the Baltic States. The research program incorporates reactor safety, radioactive waste, emergency preparedness, radioecology, cross-disciplinary studies, and information issues. The necessary administrative support program, including the NKS Secretariat, is not described herein. Neither is the aim, scope or organization of NKS, since this has been covered elsewhere. (EHS)

  6. Management of the mass casualty from the 2001 Jos crisis.

    Science.gov (United States)

    Ozoilo, K N; Kidmas, A T; Nwadiaro, H C; Iya, D; Onche, I I; Misauno, M A; Sule, A Z; Yiltok, S J; Uba, A F; Ramyil, V M; Dakum, N K; Ugwu, B T

    2014-01-01

    We report our experience in the hospital management of mass casualty following the Jos civil crisis of 2001. A retrospective analysis of the records of patients managed in the Jos civil crisis of September 2001, in Plateau State, Nigeria. Information extracted included demographic data of patients, mechanisms of injury, nature and site of injury, treatment modalities and outcome of care. A total of 463 crisis victims presented over a 5 day period. Out of these, the records of 389 (84.0%) were available and analyzed. There were 348 (89.5%) males and 41 females (10.5%) aged between 3 weeks and 70 years, with a median age of 26 years. Most common mechanisms of injury were gunshot in 176 patients (45.2%) and blunt injuries from clubs and sticks in 140 patients (36.0%). Debridement with or without suturing was the most common surgical procedure, performed in 128 patients (33%) followed by exploratory laparotomy in 27 (6.9%) patients. Complications were documented in 55 patients (14.1%) and there were 16 hospital deaths (4.1% mortality). Challenges included exhaustion of supplies, poor communication and security threats both within the hospital and outside. Most patients reaching the hospital alive had injuries that did not require lifesaving interventions. Institutional preparedness plan would enable the hospital to have an organized approach to care, with better chances of success. More effective means of containing crises should be employed to reduce the attendant casualty rate.

  7. Plans for the NKS-program 1998-2001; Planer for NKS-programmet 1998-2001

    Energy Technology Data Exchange (ETDEWEB)

    Bennerstedt, T [ed.

    1999-08-01

    The present report is a comprehensive compilation of the adopted NKS project plans for the sixth four-year period, 1998-2001. Most of the plans are in English. One is in both English and Danish. One is in Norwegian, with a brief summary in English. Only two of the six appendices are in English. In spite of this, it is believed that the report will serve as a valuable source of information not only to those actually active in or closely following the NKS work, but also the international scientific community, e.g., within EU and in the Baltic States. The research program incorporates reactor safety, radioactive waste, emergency preparedness, radioecology, cross-disciplinary studies, and information issues. The necessary administrative support program, including the NKS Secretariat, is not described herein. Neither is the aim, scope or organization of NKS, since this has been covered elsewhere. (EHS)

  8. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  9. Análisis epidemiológico de la mortalidad por causas en la Bahía de Algeciras (2001-2005 Epidemiological analysis of mortality by causes in Bahía de Algeciras, Spain (2001-2005

    Directory of Open Access Journals (Sweden)

    Concepción Cruz Rojo

    2009-10-01

    Full Text Available Objetivos: Analizar la mortalidad general y prematura por causas de los habitantes de la Bahía de Algeciras, un área particularmente expuesta a la contaminación atmosférica. Métodos: Se comparan las tasas ajustadas por edad y las tasas de años potenciales de vida perdidos de 1 a 70 años, por sexo y por causas, del área estudiada (años 2001 a 2005, con el resto de Andalucía (años 2001 a 2005 y el conjunto de España (año 2003 mediante la razón de las tasas (riesgo relativo y su intervalo de confianza del 95% (IC95%, y las diferencias de las tasas (riesgo atribuible. Resultados: Se encuentra un exceso de mortalidad general y prematura estadísticamente significativo en los hombres y las mujeres de la Bahía de Algeciras, una zona próxima al estrecho de Gibraltar que soporta unos altos niveles de contaminación atmosférica. El riesgo relativo de la mortalidad prematura en los hombres es de 1,16 (IC95%: 1,15-1,17 respecto a Andalucía y de 1,30 (IC95%: 1,29-1,32 respecto a España, y en las mujeres es de 1,17 (IC95%: 1,15-1,19 y 1,24 (IC95%: 1,22-1,26, respectivamente. De los grandes grupos de causas estudiados destaca el mayor riesgo de muerte por enfermedades infecciosas y parasitarias, respiratorias y tumores malignos. Por causas específicas, sobresalen la isquemia cardiaca y los tumores mal definidos en ambos sexos. En los hombres destaca la sobremortalidad general y prematura de los tumores de traquea, bronquio y pulmón, vejiga urinaria y cirrosis hepática. Conclusiones: Se constata un mayor riesgo de mortalidad general y prematura en los hombres y las mujeres de la Bahía de Algeciras, una zona con elevada concentración industrial y contaminación atmosférica. Se propone continuar con investigaciones específicas y plantear actuaciones concretas encaminadas a promover un desarrollo económico sostenible.Objective: To analyze general mortality and premature mortality by cause in the population of Bahía de Algeciras, an area

  10. MANAGEMENT BOARD MEETING OF 6 DECEMBER 2001

    CERN Multimedia

    2001-01-01

    Outcome of the Special Meeting of the Scientific Policy Committee on 16th November 2001 and of the Special Meeting of the Committee of Council on 21st November 2001 The Director-General reported that the special meeting of the Scientific Policy Committee on 16 November had been devoted to an examination of the LHC Cost Review and of the Management's proposed funding scenarios and organizational measures for LHC completion on the basis of the relevant documents already submitted to the Finance Committee on 6 and 7 November. The SPC had welcomed the creation of the five internal task forces set up to examine the possibilities for and implications of savings, increased efficiency and restructuring throughout the Organization, expressing appreciation for the inclusion of an external representative in each task force and noting that the conclusions reached in that framework would enable it to advise the Management and Council on how to make the maximum savings with minimum damage to the European particle physics p...

  11. Western Area Power Administration annual site environmental report for calendar year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-12-31

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its

  12. Business process management : 3rd international conference, BPM 2005, Nancy, France, September 5-8, 2005 : proceedings

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Benatallah, B.; Casati, F.; Curbera, F.

    2005-01-01

    This volume contains the proceedings of the 3rd International Conference on Business Process Management (BPM 2005), organized by LORIA in Nancy, France, September 5–8, 2005. This year, BPM included several innovations with respect to previous editions, most notably the addition of an industrial

  13. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  14. [Gender analysis among articles published in Enfermedades Infecciosas y Microbiología Clínica (2001-2005)].

    Science.gov (United States)

    Aleixandre-Benavent, Rafael; González-Alcaide, Gregorio; Alonso-Arroyo, Adolfo; Castellano-Gómez, Miguel; Valderrama-Zurián, Juan Carlos

    2007-12-01

    There is growing concern for promoting equality between sexes and full integration of women in research activities. The purpose of this study is to identify the bibliometric characteristics of articles published during the 2001-2005 period in Enfermedades Infecciosas y Microbiología Clínica (EIMC) from the perspective of gender. EIMC records for 2001-2005 were obtained from the Science Citation Index database and differences according to sex were calculated for the following indicators: year of publication, type of document, number and order of author signatures, number of collaborators, and the signature/article index at the institutional and geographical level. A total of 2,163 authors were identified, 1,220 (56.4%) men and 943 (43.6%) women. The greatest of contribution from women was in original articles (42.32% of signatures). Excluding the Centro Nacional de Microbiología (Spanish National Center for Microbiology), the participation of women was lower than men in the most productive institutions. There were significant differences regarding the number of papers published and the number of collaborators; with greater productivity for men and a higher rate of collaboration for women. Studies on scientific activity according to gender provide essential information to establish the basis for a policy of equality in this regard. A yearly increase of almost 1% was seen in the number of female authors contributing articles to the EIMC, which, if the trend continues, will result in parity in coming years. Nevertheless, the presence of women in positions of high productivity remains low. The causes of this difference should be identified and corrected.

  15. National Fire Plan Research and Development 2004-2005 accomplishment report

    Science.gov (United States)

    Michael W. Hilbruner; Paul Keller

    2007-01-01

    This report highlights accomplishments achieved by USDA Forest Service National Fire Plan Research and Development projects from 2004 through 2005 in four key areas: firefighting, rehabilitation and restoration, hazardous fuels reduction, and community assistance. These highlights illustrate the broad range of knowledge and tools introduced and generated by the...

  16. Group EDF annual report 2005 sustainable development; Groupe EDF rapport annuel 2005 developpement durable

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-05-15

    The EDF Group's Sustainable Development Report for 2005 is designed to report on Group commitments particularly within its Agenda 21, its ethical charter, and the Global Compact. It has also been prepared with reference to external reference frameworks: the Global Reporting Initiative (GRI) guidelines and the French New Economic Regulations (NRE) contained in the May 15, 2001 French law. It contents the Chairman's statement, the evaluation of renewing and sharing commitments with all stakeholders, the managing local issues, EDF responses to the challenges of the future. Indicators are also provided. (A.L.B.)

  17. Management report 2005 CNEN - Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    2006-03-01

    This document reports the results of the activity management of the Comissao Nacional de Energia Nuclear - CNEN - Brazil during the year of 2005, involving the Brazilian program of nuclear activities in the areas of nuclear safety, research and development, radiopharmaceutical production, institutional management, teaching, administration in general and miscellaneous

  18. Changes in health and primary health care use of Moroccan and Turkish migrants between 2001 and 2005: a longitudinal study

    Directory of Open Access Journals (Sweden)

    Foets Marleen

    2008-01-01

    Full Text Available Abstract Background Social environment and health status are related, and changes affecting social relations may also affect the general health state of a group. During the past few years, several events have affected the relationships between Muslim immigrants and the non-immigrant population in many countries. This study investigates whether the health status of the Moroccan and Turkish immigrants in the Netherlands has changed in four years, whether changes in health status have had any influence on primary health care use, and which socio-demographic factors might explain this relationship. Methods A cohort of 108 Turkish and 102 Moroccan respondents were interviewed in 2001 and in 2005. The questionnaire included the SF-36 and the GP contact frequency (in the past two months. Interviews were conducted in the language preferred by the respondents. Data were analysed using multivariate linear regression. Results The mental health of the Moroccan group improved between 2001 and 2005. Physical health remained unchanged for both groups. The number of GP contacts decreased with half a contact/2 months among the Turkish group. Significant predictors of physical health change were: age, educational level. For mental health change, these were: ethnicity, age, civil status, work situation in 2001, change in work situation. For change in GP contacts: ethnicity, age and change in mental and physical health. Conclusion Changes in health status concerned the mental health component. Changes in health status were paired with changes in health care utilization. Among the Turkish group, an unexpected decrease in GP contacts was noticed, whilst showing a generally unchanged health status. Further research taking perceived quality of care into account might help shedding some light on this outcome.

  19. 2001 AIR & WASTE MANAGEMENT ASSOCIATION DELEGATION TO CHINA

    Science.gov (United States)

    The paper describes a visit to the People's Republic of China (China) by members of the Air & Waste Management Association in October-November 2001 as part of a People to People Ambassador Program delegation. The delegation's main goal was to exchange information in the field of ...

  20. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  1. Strategic Planning by the Chairmen, Joint Chiefs of Staff, 1990 to 2005

    National Research Council Canada - National Science Library

    Meinhart, RIchard

    2006-01-01

    .... This Letort Paper examines how four Chairmen Joint Chiefs of Staff from 1990 to 2005 used a strategic planning system to enable them to meet their statutory responsibilities specified in Title 10 US...

  2. Determinantes da recuperação do emprego formal no Brasil: evidências para o período 2001/2005 e hipoteses para uma agenda de pesquisa

    Directory of Open Access Journals (Sweden)

    José Celso Cardoso Junior

    2009-12-01

    Full Text Available Decisive factors affecting the recent increase in formal employment in Brazil. This paper gives a general overview of the evolution of labour market indicators between 1995 and 2005 in Brazil. It shows an overall increase in formal employment rates from 2001 to 2005, as opposite to what had happened from 1995 to 1999. It is argued that such recent trends might indicate the reconfiguration of the labour market in better terms, with potential positive consequences to the finance performance of the Social Security sector. The paper also examines some of the major factors associated with this new trend and their chances to maintain such tendency in the near future. It's important to notice that all of them may be subject to some kind of political management by the State. In other words, we suggest that there are suficient instruments and operative skills in the Brazilian State to make these and others factors work in favour of a more persistent strategy of development with social inclusion through labour.

  3. Kansas' forest resources, 2005

    Science.gov (United States)

    W. Keith Moser; Gary J. Brand; Melissa Powers

    2007-01-01

    The USDA Forest Service, Northern Research Station, Forest Inventory and Analysis (NRS-FIA) program is changing to a Web-based, dynamically linked reporting system. As part of the process, this year NRS-FIA is producing this abbreviated summary of 2005 data. This resource bulletin reports on area, volume, and biomass using data from 2001 through 2005. Estimates from...

  4. The G8 summit of Gleneagles (July 6-8, 2005) - the energy-climate action plan - the France-Algeria cooperation. The works of the national commission of the public debate about energy - the management of nuclear wastes - the EPR at Flamanville - the Cotentin-Maine VHV line. The oil prices surge during summer 2005, national and international reactions

    International Nuclear Information System (INIS)

    Lamy, J.; Locufier, A.; Vincent, C.; Bros, Th.; Delmestre, N.; Noilban, F.; Quintaine, Th.; Perrin, J.L.; Branche, Th.; Barthe, F.

    2006-01-01

    This issue of Energies et matieres premieres newsletter comprises five articles dealing with: 1 - the energy-climate action plan adopted by the presidents of the 8 more industrialized countries of the world (G8) during the Gleneagles summit (Scotland) in July 6-8, 2005. This action plan was discussed in association with five emerging countries, among the biggest energy consumers in the world; 2 - the works carried out by the national commission of the public debate on energy about the management of radioactive wastes. The article recalls the 3 axes of research (separation-transmutation, underground disposal and surface or sub-surface storage) and the planning of the preparation of the future project of radioactive management law which will be examined by the European parliament during the second quarter of 2006; 3 - the public debate about the setting up of the European pressurized reactor (EPR) at Flamanville (Cotentin, France); 4 - the public debate about the project of very-high voltage power line between Flamanville and Maine region for the reinforcement of the regional power grid; and 5 - the national and international reactions in front of the surge of oil prices during summer 2005. (J.S.)

  5. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  6. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes

  7. International wind energy development. World market update 2000. Forecast 2001-2005

    International Nuclear Information System (INIS)

    2001-03-01

    most significant technological trend in the market is the continuing upscaling of macines. From year 2000 the average size of WTGs is 800 kW (in 1999: 729 kW). A second trend is the implementation of more advanced control and power regulation systems, particularly on the MW machines. Another trend is the increased focus on 'direct drive' machines, even though it is not yet reflected in commercial sales other than those from Enercon and Lagerwey. Several new concepts have been announced during the year 2000. It is likely that within few years we will see commercial direct drive machines from other companies. Offshore development - demonstrated in two projects: Utgrunden, 10 MW (Sweden) and Middelgrunden, 40 MW (Denmark) - indicates that the 1.5 - 2.0 MW turbines are used for offshore. Regarding foundations, it seems that the monopile concept will be the preferred option. The special topic in this World Market Update enlightens status and perspectives of the offshore development to take off 2-5 years ahead. The new forecast released in this WMU shows an average growth rate of 17.6% for the period 2001-2005. The main trends reflected in this year's forecast are: 1) A moderate growth in Europe until offshore really takes off. It will start in Denmark in 2002 and in Germany from 2005. Germany is the market where the largest projects are being planned. 2) There is still uncertainty about the US situation beyond 2001 - including the question as to how the US government will contribute to the 'climate change' issue. 3) A steady growth in Asia, but not fast enough to meet future needs. More efficient procedures in the governments administration of the renewable field may speed up the development in China and India. 4) Another topic affecting the growth is the industry's ability to meet the future demand. It is worth noting, that the present industry has gone through two years with growth rates of + 50%, and the whole supply chain has also to be turned in for this high level of

  8. Understanding culture in territorial management and its implications for spatial planning. The case of floodplain management in urbanised delta regions in the Netherlands and Thailand

    Directory of Open Access Journals (Sweden)

    Suwanna Rongwiriyaphanich

    2014-08-01

    Full Text Available Previous experiences have shown that the implementation of planning policy does not always lead to the originally intended territorial management outcomes. This issue
is particularly crucial when policy ideas, institutions, models and programmes are transferred into places with different cultural settings without adaptations (Knieling and Othengrafen 2009b; Sanyal 2005. These unexpected consequences in planning practice and management outcomes have brought a significant amount of attention to the importance and roles of culture on shaping decision-making in territorial management process and determining transferability of a policy (Friedmann 2005a, 2005b; de Jong and Mamadouh 2002; Sanyal 2005; Ostrom 2005a; Knieling and Othengrafen 2009b. However, conceptual frameworks that seek to understand the roles of culture and its implications for spatial planning are still rather limited. This study presents and applies an integrative conceptual framework which is used
to explain how culture, planning policy and territorial management outcomes are interrelated, and what the implications are for spatial planning. The framework integrates relevant theories and ideas from anthropology, organisational management and political sciences to understand influences of culture on spatial planning. The integrative framework suggests a way of characterising territorial management in the form of ideal types. This helps simplify cultures regarding territorial management to make them comparable. It enables an analysis of ‘cultures’ that includes a broader scope of culture than existing frameworks that focus primarily on ‘planning cultures’ expressed in forms of planning systems, organisations and instruments. This broader scope includes also the implicit expressions of culture in informal forms, such as ideas, customs and social behaviours shared by involved actors in the management of a given territory. The framework also offers two analytical perspectives

  9. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  10. 5. Work Report. September 1, 2005; 5. Informe de Labores. 1 Septiembre 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    In agreement with the disposition in the 93 Th article of the Mexican United States Constitution Policy, the National Institute of Nuclear Research which is directed as decentralized public organization of the Federal Government presents its labor report corresponding to the year 2005. The institution purpose is to perform research and development in the nuclear science and technology fields, as well as to promote the peaceful uses of the nuclear energy and divulging the advances reached for entailing them to the economic, social, scientific and technological development of the country. In this report the frame of the National Plan of Development 2001-2006 and of the Energy Sectoral Program 2001-2006 are presented and whose entity objectives are the following: to use in a sure and reliable way the sources of nuclear energy and their applications for peaceful uses, maintaining those but high international standards. To promote the application of the nuclear techniques in the solution of problems of the nuclear industry, oil company and the electrical sector. To maintain the national leadership in the development, production and application of radioisotopes and radiopharmaceuticals. To contribute to the formation of human resources in the nuclear area. (Author)

  11. Outlook 2001

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    ABARE's Executive Director, Brian Fisher in his address at the annual assembly of economists and commodity producers (Outlook 2001) indicated that the world economic growth, which is of critical importance to the direction of world commodity prices, is assumed to ease in 2001 but to strengthen in 2002. Yet despite the slower world economic growth he forecast that Australia's commodity exports would rise to be worth $86 billion in 2000-2001 and $89 billion in 2001 - 2002 reflecting a relatively low Australian dollar. The value of commodity exports is then forecast to trend downwards in real terms for the remainder of the outlook period to 2005-2006. In preparing commodity projections ABARE assumed world economic growth to moderate to around 3.4% in 2001, and then strengthen to 3.9%, in 2002 supported by lower interest rates in key economies. Activity in the Australian economy is assumed to remain reasonably firm in the short term. While growth in domestic demand is likely to moderate, export performance is expected to remain strong. There has been a remarkable improvement in Australia's trade performance during the last year. This improvement is expected to continue in the short term. For energy commodities, export earnings are forecast to increase from $18.4 billion in 1999-2000 to $25.1 billion in 2000-2001 before declining to $24.4 billion in 2001-2002

  12. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  13. Group EDF annual report 2005 sustainable development

    International Nuclear Information System (INIS)

    2006-05-01

    The EDF Group's Sustainable Development Report for 2005 is designed to report on Group commitments particularly within its Agenda 21, its ethical charter, and the Global Compact. It has also been prepared with reference to external reference frameworks: the Global Reporting Initiative (GRI) guidelines and the French New Economic Regulations (NRE) contained in the May 15, 2001 French law. It contents the Chairman's statement, the evaluation of renewing and sharing commitments with all stakeholders, the managing local issues, EDF responses to the challenges of the future. Indicators are also provided. (A.L.B.)

  14. Annual report 2001. General direction of energy and raw materials

    International Nuclear Information System (INIS)

    2001-01-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  15. Supervision of Waste Management and Environmental Protection at the Swedish Nuclear Facilities 2001

    CERN Document Server

    Persson, M

    2003-01-01

    The report summarizes the supervision of waste management and environmental protection at the nuclear facilities that was carried out by the Swedish Radiation Protection Authority in 2001. A summary of the inspections and a description of important issues connected with the supervision of the nuclear facilities are given.The inspections during 2001 have focused on theme inspections of waste management, environmental inspections considering the environmental monitoring at the Swedish nuclear facilities and review safety analysis and research programs from the Swedish Nuclear Fuel and Waste Management Co.The Swedish Radiation Protection Authority finds that the operations are mainly performed according to current regulations

  16. Radioactive waste management plan for the PBMR (Pty) Ltd fuel plant

    International Nuclear Information System (INIS)

    Makgae, Mosidi E.

    2009-01-01

    The Pebble Bed Modular Reactor (Pty) Ltd Fuel Plant (PFP) radioactive waste management plan caters for waste from generation, processing through storage and possible disposal. Generally, the amount of waste that will be generated from the PFP is Low and Intermediate Level Waste. The waste management plan outlines all waste streams and the management options for each stream. It also discusses how the Plant has been designed to ensure radioactive waste minimisation through recycling, recovery, reuse, treatment before considering disposal. Compliance to the proposed plan will ensure compliance with national legislative requirements and international good practice. The national and the overall waste management objective is to ensure that all PFP wastes are managed appropriately by utilising processes that minimize, reduce, recover and recycle without exposing employees, the public and the environment to unacceptable impacts. Both International Atomic Energy Agency (IAEA) and Department of Minerals and Energy (DME) principles act as a guide in the development of the strategy in order to ensure international best practice, legal compliance and ensuring that the impact of waste on employees, environment and the public is as low as reasonably achievable. The radioactive waste classification system stipulated in the Radioactive Waste Management Policy and Strategy 2005 will play an important role in classifying radioactive waste and ensuring that effective management is implemented for all waste streams, for example gaseous, liquid or solid wastes.

  17. Rise, use and treatment of works in Austria. Compiled for the Austrian Federal Waste Management Plan 2001

    International Nuclear Information System (INIS)

    Perz, K.

    2001-06-01

    The Austrian Waste Management Act (AWG) entered into force on 1 July 1990. Paragraph 1 of the act defines the following objectives: to keep detrimental, unbeneficial or otherwise unhealthy influences on man, as well as on animals, plants, their living conditions and their natural environment as low as possible; to preserve raw material and energy resources; to keep the demand for landfill capacities as low as possible; to ensure that only such materials should remain as waste, the dumping of which does not present any potential hazard for future generations (precautionary principle). The waste management act thus places the highest priority on the protection of human beings and the environment and upon the preservation of natural resources. Accordingly, it must be the aim of waste management to handle waste in such a way that environmental pollution is kept as low as possible by prevention, recovery and disposal. Paragraph 5 of the Austrian waste management act stipulates that the Federal Minister of Agriculture, Forestry, Environment and Water Management has to issue the Federal Waste Management Plan in order to reach the objectives and observing the rules of modern waste management. Following the first waste management plan in 1992 an amendment is required every three years. This is why the Austrian Federal Environment Agency elaborated the following studies: waste generation, recovery and disposal in Austria; hazardous waste and waste oils in Austria; non-hazardous waste in Austria. Further information on waste management facilities in Austria is presented on our homepage (http://www.ubavie.gv.at). (author)

  18. Environmental Management Performance Report to DOE-RL September 2001

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2001. All other information is updated as of August 22, 2001 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable, without agreement by the regulating party

  19. Horonobe Underground Research Laboratory project. Synthesis of phase I investigation 2001-2005. Volume 'geoscientific research'

    International Nuclear Information System (INIS)

    Ota, Kunio; Abe, Hironobu; Kunimaru, Takanori

    2011-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe in Hokkaido, northern Japan. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The present report summarises the results of the Phase I geoscientific research carried out from March 2001 to March 2005. Integration of the results from different disciplines ensures that the Phase I goals have been successfully achieved and identifies key issues that need to be addressed in Phases II and III. More importantly, efforts are made to summarise as many lessons learnt from the Phase I investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. Based on experiences of selecting the URL area and site in Horonobe Town, important factors that should be taken into consideration in such selection processes and their rationale are demonstrated. In the course of stepwise surface-based investigations, a number of achievements have been made, which can eventually provide examples of integrated methodologies for characterising the sedimentary formations. The relevant surface-based investigation techniques have thus been further developed. The Horonobe URL has been designed based on geoscientific information accumulated during the surface-based investigations and the plans for safe construction and operation of the URL have been defined in a feasible manner. In addition, a variety of environmental measures taken during Phase I have proved to be

  20. How do Category Managers Manage?

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Sigurbjornsson, Tomas

    2013-01-01

    The aim of this research is to explore the managerial role of category managers in purchasing. A network management perspective is adopted. A case based research methodology is applied, and three category managers managing a diverse set of component and service categories in a global production...... firm is observed while providing accounts of their progress and results in meetings. We conclude that the network management classification scheme originally deve loped by Harland and Knight (2001) and Knight and Harland (2005) is a valuable and fertile theoretical framework for the analysis...

  1. Integrated energy, air quality and greenhouse gas management plan

    International Nuclear Information System (INIS)

    2004-03-01

    This report outlines the measures that the Resort Municipality of Whistler has taken to become a sustainable community. In 2000, the Municipality adopted the Natural Step, a tool developed by international scientists to integrate ecological principles into the practices of communities, organizations and individuals. In 2001, the Municipality adopted a comprehensive sustainability plan. This report describes the efforts to manage energy, air quality, and greenhouse gases (GHG). More than 90 per cent of the common air contaminants that contribute to air quality problems in Whistler come from the combustion of fossil fuels. The community can reduce emissions of carbon monoxide, oxides of nitrogen, oxides of sulphur, volatile organic compounds, and particulate matter by managing energy and GHG emissions. This report is divided into several sections dealing with corporate and community energy use. It presents a community profile for Whistler, its energy and emissions inventory from 2000, and an integrated energy plan. An energy and emissions forecast for 2000 to 2020 was also included along with an implementation strategy for a sustainable energy future for Whistler. refs., tabs., figs

  2. Annual report of National Institute of Radiological Sciences, 2005

    International Nuclear Information System (INIS)

    2006-10-01

    Five years have passed since the National Institute of Radiological Sciences (NIRS) was reformed as an Independent Administrative Institution (IAI) in April 2001, and this fiscal year (2005-2006) is the last year in the first Mid-term Plan of NIRS. The main items of this report, being the same as the previous year's, are: the summary of NIRS activities; research and development including studies of important project, fundamental research, fundamental and frontier research, contract research and fact-finding; management; organization/budget/finance; and appendix. Important projects are radiological studies in advanced medicine, on sensitivity, of effects on human and of hazard. Fundamental research concerns studies of environmental radiation, radiobiology, heavy particle ion therapy, diagnostic imaging, dose assessment and protection in medical radiation, brain function, development of High-Coverage Expression Profiling (HiCEP) technique and new crossover studies. Fact-finding studies are on the present situations of people exposed by nuclear experiment at Bikini Atoll in 1954 and of patients treated with thorotrast in past. Appendix cites the personnel name list, honorable events, cooperative studies, patent situation and others. (J.P.N.)

  3. Incidencia de cáncer en el área sanitaria del Salnés: período 2001-2005

    OpenAIRE

    García Sanz, Teresa

    2011-01-01

    [Resumen] Se registraron todos los casos de cáncer diagnosticados en el Hospital del Salnés desde enero 2001 hasta diciembre de 2005; todos confirmados histológicamente. Se calculó la densidad de incidencia para cada tipo de tumor; se ajustó a la población mundial para compararla con la incidencia en diversos registros de otras Comunidades Autónomas españolas. El cáncer más frecuente fue, en varones, el cáncer de piel no melanoma, el cáncer de próstata y del cáncer de colon; e...

  4. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  5. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  6. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  7. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  8. Development Plan of the Sub sector Coal 1997, 2005

    International Nuclear Information System (INIS)

    1996-11-01

    This third version of the Development Plan of the Sub-sector Coal, subsequent to the editions of 1994 and 1995, it not only obeys the initial purpose of upgrading the plan annually, but to that, there being it conceived from a principle as an indicative and dynamic plan, they have happened circumstances, such as new laws and regulations, changes in the national and international market, variations in the energy politics of the country and other that force to their upgrade. The plan, although it maintains the general structure of the previous versions, fixed as planning Bureau horizon the year 2005, and it contemplates some actions to advance on the part of the State, represented by Ecocarbon. They settle down this way, strategic objectives for each one of their programs that they should be translated in the achievement of the end enunciated in the precedent paragraph. As the achievement of the auto- sustainability of the mining in the proposed term cannot be reached without the participation and the commitment of the private sector that it is the main actor in the development of the industry, the plan it includes an agreement of commitment, signed by authorized representatives guided to the achievement of the looked for objective. It is clear that, to reach the enunciated objective, a permanent evaluation of the goals, the planning bureau of the sub-sector is needed it should stay, looking for the participation of the carboniferous private sector to reach a progressive development of the mining of the coal and of the industry in general

  9. Evolution of the efficiency and agro-environmental impact of a traditional irrigation land in the middle Ebro Valley (2001-2007)

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Garizabal, I.; Causape Valenzuela, J.; Abrahao, R.

    2009-07-01

    Alternatives in irrigation management can lead to the creation of irrigation lands that are more efficient and more respectful towards the environment. The objective of this work is to analyze the evolution of the agro-environmental impact in a traditional irrigation land of the middle Ebro Valley (Spain) which has experienced changes in its management. For such, water, salt and nitrate balances were accomplished in a hydrological basin (95 ha) in 2001, 2005, 2006 and 2007. The drought of 2005 caused more intensive water use (86%), increasing in 33% the irrigation efficiency when compared to 2001 (53%), even though a high hydric deficit (24%) was caused. Changes in the flood irrigation system management (from rotation to on demand), maximum allocations of irrigation water, billing for the volume of irrigation water consumed and the expansion of crops with lower water and fertilization needs made it possible to achieve irrigation efficiencies of approximately 73% (an increase of 20%) and to halve salt (1.3 Mg ha{sup -}1 year-1) and nitrate (25 kg NO{sub 3} --N ha{sup -}1 year{sup -}1) loads exported in the drainage. The evaluated management changes have been efficient, but nevertheless, crops still suffer certain hydric stress and since 2005 a slight but worrying negative agro-environmental tendency has been observed and should be reversed. (Author)

  10. The investigation of the national views for the strategic plan 2005-2009 of OECD/NEA

    International Nuclear Information System (INIS)

    Ko, H. S.; Ryu, J. S.; Lee, K. S.; Yang, M. H.

    2004-01-01

    OECD/NEA has been developing the Strategic Plan of 2005-2009 which will be used as the guidelines of NEA activities for this period. Korean government is of the view that national interests in the cooperation with OECD/NEA become important and are needed to be reflected to this Strategic Plan. We has prepared and suggested Korean proposal for the Strategic Plan of OECD/NEA

  11. Katrina's Lessons in California: Social and Political Trajectories of Flood Management in the Sacramento River Watershed since 2005

    Science.gov (United States)

    Comby, E.; Le Lay, Y. F.; Piegay, H.

    2017-12-01

    Over the last decade, major changes have occurred in the way that environments are managed. They can be linked with external or internal events which may shape public perception. An external event can reveal a forgotten risk and create a social problem (Hilgartner et Bosk 1988). Following the Advocacy Coalition Framework (Sabatier 1988), we studied the role of Hurricane Katrina in flood management in California from 2005 to 2013. How do policies intend to increase the city's resilience? We compared different flood policies of the Sacramento River from 2005 to 2013, by combining field observations with a principal dataset of 340 regional newspaper items (Sacramento Bee). Media coverage was analyzed using content, quotation, and textometry as well as GIS. We underlined temporal variability in public perceptions towards floods. Some planning choices (such as levees) became controversial, while journalists praised weirs, bypasses, and dams. However, Katrina does not seem to have a real impact on urban sprawl strategies in three Sacramento neighborhoods (Fig.1). We analyzed also the limits of the comparison between New Orleans and Sacramento. Dialog between stakeholders existed in space and time between here (California) and elsewhere (Louisiana), present (post-2005) and past (Katrina catastrophe), and risk and disaster. Katrina was a national scandal with political announcements. However, flood policy was developed first at a regional and then local scales. After Katrina awareness, conflicts appear: some California residents refuse to have a policy linked to Katrina applied to them. We underlined that different stakeholders became prominent: it may be useless to tackle with only one institution. Some institutions had an integrated river management, while others kept a traditional risk management. We assessed the changes in river management while using discourse to understand the (potential) shift in human-river relationships from risk management to integrated river

  12. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  13. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  14. Management report 2005 CNEN - Brazilian Nuclear Energy Commission; Relatorio de gestao 2005 CNEN - Comissao Nacional de Energia Nuclear

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This document reports the results of the activity management of the Comissao Nacional de Energia Nuclear - CNEN - Brazil during the year of 2005, involving the Brazilian program of nuclear activities in the areas of nuclear safety, research and development, radiopharmaceutical production, institutional management, teaching, administration in general and miscellaneous.

  15. Nuclear waste management plan of the Finnish TRIGA reactor

    International Nuclear Information System (INIS)

    Salmenhaara, S.E.J. . Author

    2004-01-01

    The FiR 1 - reactor, a 250 kW Triga reactor, has been in operation since 1962. The main purpose to run the reactor is now the Boron Neutron Capture Therapy (BNCT). The BNCT work dominates the current utilization of the reactor. The weekly schedule allows still one or two days for other purposes such as isotope production and neutron activation analysis. According to the Finnish legislation the research reactor must have a nuclear waste management plan. The plan describes the methods, the schedule and the cost estimate of the whole decommissioning waste and spent fuel management procedure starting from the removal of the spent fuel, the dismantling of the reactor and ending to the final disposal of the nuclear wastes. The cost estimate of the nuclear waste management plan has to be updated annually and every fifth year the plan will be updated completely. According to the current operating license of our reactor we have to achieve a binding agreement, in 2005 at the latest, between our Research Centre and the domestic nuclear power companies about the possibility to use the Olkiluoto final disposal facility for our spent fuel. There is also the possibility to make the agreement with USDOE about the return of our spent fuel back to USA. If we want, however, to continue the reactor operation beyond the year 2006, the domestic final disposal is the only possibility. In Finland the producer of nuclear waste is fully responsible for its nuclear waste management. The financial provisions for all nuclear waste management have been arranged through the State Nuclear Waste Management Fund. The main objective of the system is that at any time there shall be sufficient funds available to take care of the nuclear waste management measures caused by the waste produced up to that time. The system is applied also to the government institutions like FiR 1 research reactor. (author)

  16. Water Use in Florida, 2005 and Trends 1950-2005

    Science.gov (United States)

    Marella, Richard L.

    2008-01-01

    Water is among Florida's most valued resources. The State has more than 1,700 streams and rivers, 7,800 freshwater lakes, 700 springs, 11 million acres of wetlands, and underlying aquifers yielding quantities of freshwater necessary for both human and environmental needs (Fernald and Purdum, 1998). Although renewable, these water resources are finite, and continued growth in population, tourism, and agriculture will place increased demands on these water supplies. The permanent population of Florida in 2005 totaled 17.9 million, ranking fourth in the Nation (University of Florida, 2006); nearly 86 million tourists visited the State (Orlando Business Journal, 2006). In 2005, Florida harvested two-thirds of the total citrus production in the United States and ranked fifth in the Nation net farm income (Florida Department of Agriculture and Consumer Services, 2006). Freshwater is vital for sustaining Florida's population, economy, and agricultural production. Accurate estimates reflecting water use and trends in Florida are compiled in 5-year intervals by the U.S. Geological Survey (USGS) in cooperation with the Florida Department of Environmental Protection (FDEP) and the Northwest Florida, St. Johns River, South Florida, Southwest Florida, and Suwannee River Water Management Districts (Marella, 2004). This coordinated effort provides the necessary data and information for planning future water needs and resource management. The purpose of this fact sheet is to present the highlights of water use in Florida for 2005 along with some significant trends in withdrawals since 1950.

  17. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  18. Childhood deaths from external causes in Estonia, 2001-2005.

    Science.gov (United States)

    Väli, Marika; Lang, Katrin; Soonets, Ruth; Talumäe, Marika; Grjibovski, Andrej M

    2007-07-17

    In 2000, the overall rate of injury deaths in children aged 0-14 was 28.7 per 100000 in Estonia, which is more than 5 times higher than the corresponding rate in neighbouring Finland. This paper describes childhood injury mortality in Estonia by cause and age groups, and validates registration of these deaths in the Statistical Office of Estonia against the autopsy data. The data on causes of all child deaths in Estonia in 2001-2005 were abstracted from the autopsy protocols at the Estonian Bureau of Forensic Medicine. Average annual mortality rates per 100,000 were calculated. Coverage (proportion of the reported injury deaths from the total number of injury deaths) and accuracy (proportion of correctly classified injury deaths) of the registration of causes of death in Statistical Office of Estonia were assessed by comparing the Statistical Office of Estonia data with the data from Estonian Bureau of Forensic Medicine. Average annual mortality from external causes in 0-14 years-old children in Estonia was 19.1 per 100,000. Asphyxia and transport accidents were the major killers followed by poisoning and suicides. Relative contribution of these causes varied greatly between age groups. Intent of death was unknown for more than 10% of injury deaths. Coverage and accuracy of registration of injury deaths by Statistical Office of Estonia were 91.5% and 95.3%, respectively. Childhood mortality from injuries in Estonia is among the highest in the EU. The number of injury deaths in Statistical Office of Estonia is slightly underestimated mostly due to misclassification for deaths from diseases. Accuracy of the Statistical Office of Estonia data was high with some underestimation of intentional deaths. Moreover, high proportion of death with unknown intent suggests underestimation of intentional deaths. Reduction of injury deaths should be given a high priority in Estonia. More information on circumstances around death is needed to enable establishing the intent of death.

  19. MANAGEMENT BOARD MEETING OF 8 NOVEMBER 2001

    CERN Multimedia

    2001-01-01

    The Management Board's meeting on 8 November 2001 was essentially convened to review the meeting of the Finance Committee on 6 and 7 November and to examine the financial and organisational measures needed to resolve the present budget difficulties associated with the increase in the LHC materials cost announced in September. The Director-General reported that, following the Management's submission of the preliminary results of the LHC cost-to-completion review in September, revealing a final materials cost some 20% higher than originally estimated in 1996, the first day of the Finance Committee's November meeting had been devoted to a presentation of updated cost-to-completion estimates, based on a detailed review of all LHC system and sub-system components, and to the examination of initial funding scenarios and organisational measures for the remaining period of LHC construction (2002-2006) and the first years of operation (2006-2012). The Committee had taken note that the Management would provide more pre...

  20. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  1. Radioactive Waste Management BasisSept 2001

    International Nuclear Information System (INIS)

    Goodwin, S.S.

    2011-01-01

    This Radioactive Waste Management Basis (RWMB) documents radioactive waste management practices adopted at Lawrence Livermore National Laboratory (LLNL) pursuant to Department of Energy (DOE) Order 435.1, Radioactive Waste Management. The purpose of this RWMB is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

  2. Kootenai River White Sturgeon Recovery Implementation Plan and Schedule; 2005-2010, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Anders, Paul

    2007-03-01

    Kootenai River white sturgeon have been declining for at least 50 years and extinction of the wild population is now imminent (Paragamian et al. 2005). Only 630 adults were estimated to remain in 2002 from a population ten times that size just 20 years ago. Significant recruitment of young sturgeon has not been observed since the early 1970s and consistent annual recruitment has not been seen since the 1950s. The remaining wild population consists of a cohort of large, old fish that is declining by about 9% per year as fish die naturally and are not replaced. At this rate, the wild population will disappear around the year 2040. Numbers have already reached critical low levels where genetic and demographic risks are acute. The Kootenai River White Sturgeon Recovery Team was convened in 1994, provided a draft Recovery Plan in 1996 and the first complete Recovery Plan for Kootenai River white sturgeon in 1999 (USFWS 1996, 1999). The Plan outlined a four part strategy for recovery, including: (1) measures to restore natural recruitment, (2) use of conservation aquaculture to prevent extinction, (3) monitoring survival and recovery, and (4) updating and revising recovery plan criteria and objectives as new information becomes available. Sturgeon recovery efforts are occurring against a backdrop of a broader ecosystem protection and restoration program for the Kootenai River ecosystem. With abundance halving time of approximately 8 years, the Kootenai River white sturgeon population is rapidly dwindling, leaving managers little time to act. Decades of study consistently indicate that recruitment failure occurs between embryo and larval stages. This assertion is based on four key observations. First, almost no recruitment has occurred during the last 30 years. Second, thousands of naturally produced white sturgeon embryos, most viable, have been collected over the past decade, resulting from an estimated 9 to 20 spawning events each year. Third, Kootenai River white

  3. Water resource systems planning and management an introduction to methods, models, and applications

    CERN Document Server

    Loucks, Daniel P

    2017-01-01

    This book is open access under a CC BY-NC 4.0 license. This revised, updated textbook presents a systems approach to the planning, management, and operation of water resources infrastructure in the environment. Previously published in 2005 by UNESCO and Deltares (Delft Hydraulics at the time), this new edition, written again with contributions from Jery R. Stedinger, Jozef P. M. Dijkman, and Monique T. Villars, is aimed equally at students and professionals. It introduces readers to the concept of viewing issues involving water resources as a system of multiple interacting components and scales. It offers guidelines for initiating and carrying out water resource system planning and management projects. It introduces alternative optimization, simulation, and statistical methods useful for project identification, design, siting, operation and evaluation and for studying post-planning issues. The authors cover both basin-wide and urban water issues and present ways of identifying and evaluating alternatives for ...

  4. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  5. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  6. Progress of nuclear safety research. 2001

    Energy Technology Data Exchange (ETDEWEB)

    Anoda, Yoshinari; Sasajima, Hideo; Nishiyama, Yutaka (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-10-01

    JAERI is conducting nuclear safety research primarily at the Nuclear Safety Research Center in close cooperation with the related departments in accordance with the Long Term Plan for Development and Utilization of Nuclear Energy or the Safety Research Annual Plan issued by the Japanese government. The safety research at JAERI concerns the engineering safety of nuclear power plants and nuclear fuel cycle facilities, and radioactive waste management as well as advanced technology for safety improvement or assessment. Also, JAERI has conducted international collaboration to share the information on common global issues of nuclear safety. This report summarizes the nuclear safety research activities of JAERI from April 1999 through March 2001. (author)

  7. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  8. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  9. Publicación Estudiantil en Revistas Médicas Venezolanas, 2001 - 2005

    Directory of Open Access Journals (Sweden)

    Rafael Angulo

    2008-01-01

    Full Text Available Objetivo: Cuantificar la participación estudiantil en la publicación de contribuciones originales en revistas médicas venezolanas. Diseño: estudio observacional ,retrospectivo. Lugar: Hemeroteca de la Facultad de Medicina de la Universidad de Los Andes y en la página web de SciELO Venezuela. Población: artículos originales, comunicaciones cortas y cartas al editor, publicadas en el periodo 2001 al 2005, en los volúmenes de revistas de periodicidad trimestral actualizadas. Intervenciones: revisión de la filiación de los autores (estudiante o profesional, universidad y escuela de procedencia, tipo de artículo y revista de publicación. Principales resultados: frecuencia y porcentaje de artículos con participación estudiantil. Resultados: se incluyeron 333 contribuciones originales de tres revistas, en 3,9% (11 hubo participación estudiantil en la autoría. La Revista de la Sociedad Venezolana de Microbiología fue la que publicó más artículos estudiantiles (5. El año 2002 se registraron seis publicaciones, sin encontrar una tendencia por año. Todas las publicaciones fueron realizadas entre profesionales y estudiantes, en todos los casos un profesional fue el primer autor. Conclusiones: la participación estudiantil en la publicación de artículos en revistas médicas venezolanas está presente pero en un bajo porcentaje. Se recomienda orientar a los estudiantes en la publicación de sus investigaciones.

  10. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-09-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  11. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-01-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  12. Group EDF at a glance 2005; Groupe EDF l'essentiel 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-05-15

    The EDF Group is a leading player in the European energy industry, present in all areas of the electricity value chain, from generation to trading, and increasingly active in the gas chain in Europe. 2005 was a crucial year for EDF: growth in sales and a doubling of net income, the opening of the capital, the stepping up of our strategic development plan focused on Europe, a new public service agreement in France. This document presents the main points of the group activities in 2005: the group profile, the growing of the group, the solid position in France (sales and marketing, production and global warming, the radioactive wastes management and the business), consolidating positions in Europe and the international activities by pursuing a selective strategy. (A.L.B.)

  13. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  14. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  15. 5. Work Report. September 1, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    In agreement with the disposition in the 93 Th article of the Mexican United States Constitution Policy, the National Institute of Nuclear Research which is directed as decentralized public organization of the Federal Government presents its labor report corresponding to the year 2005. The institution purpose is to perform research and development in the nuclear science and technology fields, as well as to promote the peaceful uses of the nuclear energy and divulging the advances reached for entailing them to the economic, social, scientific and technological development of the country. In this report the frame of the National Plan of Development 2001-2006 and of the Energy Sectoral Program 2001-2006 are presented and whose entity objectives are the following: to use in a sure and reliable way the sources of nuclear energy and their applications for peaceful uses, maintaining those but high international standards. To promote the application of the nuclear techniques in the solution of problems of the nuclear industry, oil company and the electrical sector. To maintain the national leadership in the development, production and application of radioisotopes and radiopharmaceuticals. To contribute to the formation of human resources in the nuclear area. (Author)

  16. Challenges of the management of mass casualty: lessons learned from the Jos crisis of 2001.

    Science.gov (United States)

    Ozoilo, Kenneth N; Pam, Ishaya C; Yiltok, Simon J; Ramyil, Alice V; Nwadiaro, Hyacinth C

    2013-10-28

    Jos has witnessed a series of civil crises which have generated mass casualties that the Jos University Teaching Hospital has had to respond to from time to time. We review the challenges that we encountered in the management of the victims of the 2001 crisis. We reviewed the findings of our debriefing sessions following the sectarian crisis of September 2001 and identified the challenges and obstacles experienced during these periods. Communication was a major challenge, both within and outside the hospital. In the field, there was poor field triage and no prehospital care. Transportation and evacuation was hazardous, for both injured patients and medical personnel. This was worsened by the imposition of a curfew on the city and its environs. In the hospital, supplies such as fluids, emergency drugs, sterile dressings and instruments, splints, and other consumables, blood and food were soon exhausted. Record keeping was erratic. Staff began to show signs of physical and mental exhaustion as well as features of anxiety and stress. Tensions rose between different religious groups in the hospital and an attempt was made by rioters to attack the hospital. Patients suffered poor subsequent care following resuscitation and/or surgery and there was neglect of patients on admission prior to the crisis as well as non trauma medical emergencies. Mass casualties from disasters that disrupt organized societal mechanisms for days can pose significant challenges to the best of institutional disaster response plans. In the situation that we experienced, our disaster plan was impractical initially because it failed to factor in such a prolongation of both crisis and response. We recommend that institutional disaster response plans should incorporate provisions for the challenges we have enumerated and factor in peculiarities that would emanate from the need for a prolonged response.

  17. [Latest trends in the surgical management of mandibular condyle fractures in France, 2005-2012].

    Science.gov (United States)

    Trost, O; Péron, J-M

    2013-12-01

    The surgical treatment of mandibular condylar fractures is commonly performed. We had for aim to present the latest trends in the surgical management of condylar fractures in France, between 2005 and 2012. A survey was performed among the 49 members of the French college of oral and maxillofacial surgeons between January and September 2012, with a questionnaire sent by email. We analyzed the therapeutic management, the surgical indications; the techniques used according to the fracture, and the postoperative treatment protocols. The data was compared to that of a similar study performed in 2005. The overall reply rate was 86%. Low subcondylar fractures were operated on in all institutions (100%), compared to 76% in 2005. The most popular technique was the high submandibular approach with intraoral miniplate fixation osteosynthesis. High subcondylar and diacapitular fractures were operated on in respectively 82% and 35% of the cases compared to 29% and 10% in 2005 with various surgical techniques and postoperative management. French maxillofacial surgeons operated on more mandibular condylar fractures in 2012 than in 2005. As observed in 2005, the lower and the more dislocated the fractures were, the more they were operated on. The high submandibular approach has become the most popular approach. The use of miniplates for bone fixation has become common. Diacapitular fractures were usually treated functionally. The postoperative management varied greatly from one team to the other. Copyright © 2013. Published by Elsevier Masson SAS.

  18. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  19. Management report of the executive board 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This 2005 report of the executive board of the group AREVA provides information on the following five topics: 1 - asset of financial position and performance with the human resources and the environmental report. 2 - general information on the company and share capital. 3 - the regulated agreements. 4 - information regarding executive management and supervisory bodies. 5 - annual general meeting of shareholders of may 2, 2006 and financial statements and notes. (A.L.B.)

  20. Management report of the executive board 2005

    International Nuclear Information System (INIS)

    2005-01-01

    This 2005 report of the executive board of the group AREVA provides information on the following five topics: 1 - asset of financial position and performance with the human resources and the environmental report. 2 - general information on the company and share capital. 3 - the regulated agreements. 4 - information regarding executive management and supervisory bodies. 5 - annual general meeting of shareholders of may 2, 2006 and financial statements and notes. (A.L.B.)

  1. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  2. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  3. Mortalidade materna e incidência de dengue na Região Sudeste do Brasil: estudo ecológico no período 2001-2005 Maternal mortality and impact of dengue in Southeast Brazil: an ecological study, 2001-2005

    Directory of Open Access Journals (Sweden)

    Anne Karin Madureira da Mota

    2012-06-01

    Full Text Available O objetivo desse estudo foi explorar a distribuição de efeitos reprodutivos em decorrência da infecção por dengue durante a gestação, entre 2001 e 2005. Foi realizado estudo epidemiológico com delineamento ecológico cujas unidades de análise foram municípios com mais de 80 mil habitantes na Região Sudeste do Brasil. Nestes, foi determinada a correlação entre a incidência de dengue em mulheres de 15 a 39 anos e indicadores selecionados de mortalidade (materna, fetal, perinatal, neonatal, neonatal precoce e infantil, por meio do coeficiente de correlação de Spearman. Foi observada a presença de forte correlação positiva entre as medianas das taxas de incidência de dengue em mulheres de 15 a 39 anos e as medianas da taxas de mortalidade materna (r = 0,88; IC95%: 0,51; 1,00, com coeficiente de determinação R² = 0,78. A magnitude da correlação observada entre a incidência de dengue e a mortalidade materna na Região Sudeste é sugestiva de que a ocorrência da infecção durante a gravidez possa impactar negativamente a evolução desta, com repercussões para a mortalidade materna.The aim of this study was to explore the distribution of reproductive outcomes following dengue virus infection during pregnancy (2001-2005. An ecological epidemiological study was conducted in all counties with more than 80,000 inhabitants in Southeast Brazil. The study explored the correlation between dengue incidence rates in women 15-39 years of age and selected mortality indicators (maternal, fetal, perinatal, neonatal, early neonatal, and infant in these counties, and Spearman correlation coefficients were calculated. A positive correlation was observed between median dengue incidence in women 15-39 years of age and median maternal mortality (r = 0.88; 95%CI: 0.51; 1.00, with a determination coefficient R² = 0.78. The correlation between dengue incidence in childbearing-age women and reproductive outcomes in Southeast Brazil suggests that

  4. The ExamBase Project at the University of Auckland 2001-2005

    OpenAIRE

    Holley, Rose

    2005-01-01

    Exam papers have always been a heavily used resource in University of Auckland libraries. Prior to 2001 the library provided hard copies of exam papers in all its 15 libraries. These were heavily used at all times of the year, especially in the weeks leading up to exams. In 1996 the University Library first began to explore the possibility of providing past exam papers electronically to University students and staff. In 2001 a trial pilot project was carried out, which was successful result...

  5. National report of the Slovak Republic. Compiled in terms of the joint convention on the safety of spent fuel management and on the safety of radioactive waste management. 2005

    International Nuclear Information System (INIS)

    Hekel, P.; Ivan, J.; Lukacovic, K.; Parimucha, F.; Suss, J; Tomek, J.; Jurina, V.; Kobzova, D.; Konecny, L.; Homola, J.; Zavazanova, A.; Metke, E.; Turner, M.; Vaclav, J.; Ziakova, M.; Pospisil, M.; Petrik, T.

    2005-09-01

    The National Report (Compiled in terms of the Joint Convention - September 2005) contains information how each of the obligations of the Joint Convention have been implemented. A account of activities carried out by the Nuclear Regulatory Authority of the Slovak Republic (UJD) and other Slovak organisations are presented. These activities are reported under the headings: (A) Introduction; (B) Spent fuel and radioactive waste management; C) Scope of application; (D) Inventories and lists; (E) Legislation and regulation; (F) Other general safety provisions; (G) Safety of spent fuel management; (H) Safety of RAW management; (I) Transboundary movement of SF and RAW; (J) Disused sealed sources; (K) planned activiries to improve safety; (L) Annexes

  6. Estructura salarial y segmentación en el mercado laboral de Colombia: un análisis de las siete principales ciudades, 2001-2005

    OpenAIRE

    Mesa, Diana Carolina; Garcia-Suaza, Andres; Roa, Mónica

    2015-01-01

    Este documento se concentra en el estudio de las diferencias salariales mediante la comparación de las distribuciones de los salarios para las siete principales ciudades colombianas en el periodo 2001-2005 con datos de la Encuesta Continua de Hogares. Se detectan diferencias significativas que se explican a la luz de la teoría del capital humano y de segmentación laboral; mediante la estimación de ecuaciones de salarios a partir de las características socioeconómicas d...

  7. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  8. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  9. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  10. Proceedings from the 2001 NASA Occupational Health Conference: Risk Assessment and Management in 2001

    Science.gov (United States)

    Roberson, Sheri (Editor); Kelly, Bruce (Editor); Gettleman, Alan G. (Technical Monitor)

    2001-01-01

    This Conference convened approximately 86 registered participants of invited guest speakers, NASA presenters, and a broad spectrum of the Occupational Health disciplines representing NASA Headquarters and all NASA Field Centers. Two days' Professional Development Courses on Exposure Assessment Strategies and Statistics and on Advanced Cardiac Life Support training and recertification preceded the Conference. With the theme, 'Risk Assessment and Management in 2001,' conferees were first provided updates from the Program Principal Center Office and the Headquarters Office. Plenary sessions elaborated on several topics: biological terrorism, OSHA recordability, Workers' Compensation issues, Federal ergonomic standards, bridging aerospace medicine and occupational health-especially in management of risk in spaceflight, and EAP operations with mission failures. A keynote address dealt with resiliency skills for 21st century workers and two NASA astronaut speakers highlighted a tour of the Johnson Space Center. During discipline specific breakout sessions, current issues in occupational health management and policy, credentialing and privileging, health risk assessment, measurement and standardization, audits, database development, prevention and rehabilitation, international travel and infection control, employee assistance, nursing process, and environmental health were presented.

  11. The extended teamwork 2004/2005 exploratory study. Study plan

    International Nuclear Information System (INIS)

    Skjerve, Ann Britt; Strand, Stine; Skraaning, Gyrd Jr.; Nihlwing, Christer; Helgar, Stein; Olsen, Asle; Kvilesjoe, Hans Oeyvind; Meyer, Geir; Droeivoldsmo, Asgeir; Svengren, Haakan

    2005-09-01

    The report documents the study plan for the Extended Teamwork 2004/2005 exploratory study, which is performed within the Extended Teamwork HRP research program. The purpose of the research program is to generate ideas on how teamwork in nuclear power plants may be affected by the introduction of new operational concepts. The Extended Teamwork 2004/2005 exploratory study contributes with empirical knowledge on the effect of a new operational concept, implying increased automation levels, changed operator roles, redefined competence requirements to the operators, and new technologies to support co-operation, on teamwork. The Extended Teamwork 2004/2005 exploratory study covered occurrences during the early transition phase, i.e., from the time the operators are introduced to the possible future operational environment, to the time they have completed the twelve scenarios comprised by the study. The study assessed how familiarity with operation in the possible future operational environment may affect the extent and quality of co-operation. The report accounts for the motivation for performing the exploratory study, and explains the research question. It describes the theoretical approach, which is based on Co-operation Theory, the human-centered automation approach, and theories on co-operation across distances, and introduces the concept extended teamwork. It also describes the method applied: it provides a detailed description of the possible future operational environment, including requirements with respect to autonomy and authority - both for humans and for automatic agents, and describes the technology applied to support co-operation in the control-room team. In addition, all measurement techniques applied in the study are accounted for (system logs, questionnaires, interviews, etc.). (Author)

  12. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  13. Spatial and temporal distribution of tributyltin (TBT) in seawater, sediments and bivalves from coastal areas of Korea during 2001-2005.

    Science.gov (United States)

    Choi, Minkyu; Choi, Hee-Gu; Moon, Hyo-Bang; Kim, Gui-Young

    2009-04-01

    Tributyltin (TBT) concentrations were determined in seawater, sediments and bivalve samples collected from Korean coastal areas during 2001-2005, to investigate the levels and temporal variation in TBT contamination in relation to the timing of the imposition of regulations on TBT use in Korea. TBT concentrations ranged from TBT were found at locations close to intensive shipping traffic and industrial complexes, and the contamination at some hot spot areas was high enough to cause harmful effects on marine organisms. TBT concentrations and their occurrence in Korean coastal waters have been decreasing annually. In particular, TBT concentrations in seawater have dramatically decreased. This result is consistent with regulations and bans on the use of TBT in Korea.

  14. Childhood deaths from external causes in Estonia, 20012005

    Science.gov (United States)

    Väli, Marika; Lang, Katrin; Soonets, Ruth; Talumäe, Marika; Grjibovski, Andrej M

    2007-01-01

    Background In 2000, the overall rate of injury deaths in children aged 0–14 was 28.7 per 100000 in Estonia, which is more than 5 times higher than the corresponding rate in neighbouring Finland. This paper describes childhood injury mortality in Estonia by cause and age groups, and validates registration of these deaths in the Statistical Office of Estonia against the autopsy data. Methods The data on causes of all child deaths in Estonia in 20012005 were abstracted from the autopsy protocols at the Estonian Bureau of Forensic Medicine. Average annual mortality rates per 100,000 were calculated. Coverage (proportion of the reported injury deaths from the total number of injury deaths) and accuracy (proportion of correctly classified injury deaths) of the registration of causes of death in Statistical Office of Estonia were assessed by comparing the Statistical Office of Estonia data with the data from Estonian Bureau of Forensic Medicine. Results Average annual mortality from external causes in 0–14 years-old children in Estonia was 19.1 per 100,000. Asphyxia and transport accidents were the major killers followed by poisoning and suicides. Relative contribution of these causes varied greatly between age groups. Intent of death was unknown for more than 10% of injury deaths. Coverage and accuracy of registration of injury deaths by Statistical Office of Estonia were 91.5% and 95.3%, respectively. Conclusion Childhood mortality from injuries in Estonia is among the highest in the EU. The number of injury deaths in Statistical Office of Estonia is slightly underestimated mostly due to misclassification for deaths from diseases. Accuracy of the Statistical Office of Estonia data was high with some underestimation of intentional deaths. Moreover, high proportion of death with unknown intent suggests underestimation of intentional deaths. Reduction of injury deaths should be given a high priority in Estonia. More information on circumstances around death is

  15. Childhood deaths from external causes in Estonia, 20012005

    Directory of Open Access Journals (Sweden)

    Soonets Ruth

    2007-07-01

    Full Text Available Abstract Background In 2000, the overall rate of injury deaths in children aged 0–14 was 28.7 per 100000 in Estonia, which is more than 5 times higher than the corresponding rate in neighbouring Finland. This paper describes childhood injury mortality in Estonia by cause and age groups, and validates registration of these deaths in the Statistical Office of Estonia against the autopsy data. Methods The data on causes of all child deaths in Estonia in 20012005 were abstracted from the autopsy protocols at the Estonian Bureau of Forensic Medicine. Average annual mortality rates per 100,000 were calculated. Coverage (proportion of the reported injury deaths from the total number of injury deaths and accuracy (proportion of correctly classified injury deaths of the registration of causes of death in Statistical Office of Estonia were assessed by comparing the Statistical Office of Estonia data with the data from Estonian Bureau of Forensic Medicine. Results Average annual mortality from external causes in 0–14 years-old children in Estonia was 19.1 per 100,000. Asphyxia and transport accidents were the major killers followed by poisoning and suicides. Relative contribution of these causes varied greatly between age groups. Intent of death was unknown for more than 10% of injury deaths. Coverage and accuracy of registration of injury deaths by Statistical Office of Estonia were 91.5% and 95.3%, respectively. Conclusion Childhood mortality from injuries in Estonia is among the highest in the EU. The number of injury deaths in Statistical Office of Estonia is slightly underestimated mostly due to misclassification for deaths from diseases. Accuracy of the Statistical Office of Estonia data was high with some underestimation of intentional deaths. Moreover, high proportion of death with unknown intent suggests underestimation of intentional deaths. Reduction of injury deaths should be given a high priority in Estonia. More information on

  16. [Soil-transmitted helminth trends and prevalence in La Virgen, Colombia 1995-2005].

    Science.gov (United States)

    Fernández-Niño, Julián A; Reyes-Harker, Patricia; Moncada-Alvarez, Ligia I; López, Myriam C; Cháves, María Del Pilar; Knudson, Angélica; Ariza, Yoseth

    2007-01-01

    Describing soil-transmitted helminthiasis prevalence and trends in children aged less than 15 in the village of La Virgen, Cundinamarca. Three non-random surveys were carried out on school-children aged 0 to 15 years. Intestinal parasitism was determined In the three cross-sectional studies by direct examination of fecal samples and modified Ritchie-Frick concentration method. Intestinal parasitism distribution was analysed and the trend during 1995-2005 described. The prevalence of intestinal parasitism in children aged less than 5 increased from 62,5 % in 1995 to 66,7 % in 2001 and to 69 % in 2005; soil-transmitted helminthiasis prevalence in this age group was 37,5 % in 1995, 23,6 % in 2001 and 27,6 % in 2005. The prevalence of intestinal parasitism for children aged over 5 increased from 86,2 % in 1995 to 89,1 % in 2005; soil-transmitted helminthiasis prevalence was 62,9 % in 1995, 39,8 % in 2001 and 23,9 % in 2005. Soil-transmitted helminthiasis was endemic and presented high prevalence during the study period. Effective control measures are needed to prevent intestinal parasitism in pre-school and schoolchildren.

  17. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  18. Expansion of discharge planning system in Japan: Comparison of results of a nationwide survey between 2001 and 2010

    Directory of Open Access Journals (Sweden)

    Nagata Satoko

    2012-08-01

    Full Text Available Abstract Background In response to the rapid aging of the population in Japan, many care systems have been created in quick succession. Establishment of discharge planning departments (DPDs in hospitals is one of them. In this study, we compared the distribution and characteristics of DPDs and the characteristics of the hospitals that have DPDs between 2001 and 2010 in Japan. Methods We mailed a questionnaire about the characteristics of hospitals and existence and situation of DPDs to all general hospitals with 100 or more general beds in 2001 and in 2010. Results In 2001, of the 3,268 hospitals queried, 1,568 (48.0% responded and 1,357 (41.5% were selected for data analysis. In 2010, among 2,600 hospitals, 940 hospitals (36.1% responded and 913 (35.1% met the inclusion criteria. The percentage of hospitals with DPDs increased from 30% to more than 70% between the two surveys. More departments were under the direct control of the hospital director and more physicians participated in discharge planning activities in 2010 than in 2001. In 2001, private hospitals and hospitals with an affiliated institution or agency tended to have a DPD; however, the relationship between these factors and the presence of a DPD had disappeared in 2010. Larger hospitals and hospitals with more nurses per patient tended to have a DPD both in 2001 and 2010. Conclusions Since 2008, the establishment of a DPD has been directly connected to medical fees so hospital administrators might have recognized the DPD as a “necessary and paid for” department. Having a DPD was the majority’s policy in Japan, and we must recognize the importance of quality assurance through DPDs from now on, especially in small hospitals.

  19. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  20. Sport Facility Planning and Management. Sport Management Library.

    Science.gov (United States)

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  1. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  2. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  3. Horonobe Underground Research Laboratory project. Synthesis of phase 1 investigation 2001-2005, Volume 'geological disposal research'

    International Nuclear Information System (INIS)

    Fujita, Tomoo; Taniguchi, Naoki; Maekawa, Keisuke; Sawada, Atsushi; Makino, Hitoshi; Sasamoto, Hiroshi; Yoshikawa, Hideki; Shibata, Masahiro; Ota, Kunio; Miyahara, Kaname; Naito, Morimasa; Yui, Mikazu; Matsui, Hiroya; Hama, Katsuhiro; Kunimaru, Takanori; Takeuchi, Ryuji; Tanai, Kenji; Kurikami, Hiroshi; Wakasugi, Keiichiro; Ishii, Eiichi

    2011-03-01

    This report summarizes the progress of research and development on geological disposal during the surface-based investigation phase (2001-2005) in the Horonobe Underground Research Laboratory project, of which aims are to apply the design methods of geological disposal and mass transport analysis to actual geological conditions obtained from the project as an example of actual geological environment. For the first aim, the design methods for the geological disposal facility proposed in 'H12 report (the second progress report)' was reviewed and then improved based on the recent knowledge. The applicability of design for engineered barrier system, backfill of disposal tunnel, underground facility was illustrated. For the second aim, the conceptual structure from site investigation and evaluation to mass transport analysis was developed as a work flow at first. Then following this work flow a series of procedures for mass transport analysis was applied to the actual geological conditions to illustrate the practical workability of the work flow and the applicability of this methodology. Consequently, based on the results, future subjects were derived. (author)

  4. Horonobe Underground Research Laboratory project synthesis of phase I investigation 2001-2005. Volume 'Geological disposal research'

    International Nuclear Information System (INIS)

    Fujita, Tomoo; Taniguchi, Naoki; Tanai, Kenji; Nishimura, Mayuka; Kobayashi, Yasushi; Hiramoto, Masayuki; Maekawa, Keisuke; Sawada, Atsushi; Makino, Hitoshi; Sasamoto, Hiroshi; Yoshikawa, Hideki; Shibata, Masahiro; Wakasugi, Keiichiro; Nakano, Katsushi; Seo, Toshihiro; Miyahara, Kaname; Naito, Morimasa; Yui, Mikazu; Matsui, Hiroya; Kurikami, Hiroshi; Kunimaru, Takanori; Ishii, Eiichi; Ota, Kunio; Hama, Katsuhiro; Takeuchi, Ryuji

    2007-03-01

    This report summarizes the progress of research and development on geological disposal during the surface-based investigation phase (2001-2005) in the Horonobe Underground Research Laboratory project (HOR), of which aims are to apply the design methods of geological disposal and mass transport analysis to actual geological conditions obtained from the surface-based investigations in HOR as an example of actual geological environment. For the first aim, the design methods for the geological disposal facility proposed in 'H12 report (the second progress report)' was reviewed and then improved based on the recent knowledge. The applicability of design for engineered barrier system, backfill of disposal tunnel, underground facility was illustrated. For the second aim, the conceptual structure from site investigation and evaluation to mass transport analysis was developed as a work flow at first. Then following this work flow a series of procedures for mass transport analysis was applied to the actual geological conditions to illustrate the practical workability of the work flow and the applicability of this methodology. Consequently, based on the results, future subjects were derived. (author)

  5. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  6. Wisconsin's forest resources, 2005

    Science.gov (United States)

    Charles, H. (Hobie) Perry; Gary J. Brand

    2006-01-01

    The annual forest inventory of Wisconsin continues, and this document reports 2001-05 moving averages for most variables and comparisons between 2000 and 2005 for growth, removals, and mortality. Summary resource tables can be generated through the Forest Inventory Mapmaker website at http://ncrs2.fs.fed.us/4801/fiadb/index. htm. Estimates from this inventory show a...

  7. Pelagic Project Mauritania 2005-2006

    NARCIS (Netherlands)

    Heessen, H.J.L.; Tjoe-Awie, P.J.; Haan, de D.; Ybema, M.S.

    2007-01-01

    The Pelagic Project Mauritania 2005-2006 was the continuation of two earlier, but similar, projects for the years 1998-2001 and 2002-2004. The project was carried out in cooperation between IMARES and IMROP and had as most important objectives to further the assessment of small pelagic species,

  8. Financial Management Status Report and 5-Year Plan, 1997 Through 2001

    National Research Council Canada - National Science Library

    1997-01-01

    This financial management status report contains the GSA vision statement, goals and strategies, asset management, organization and personnel, accountability and control, financial management systems...

  9. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  10. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  11. The DISAM Journal of International Security Assistance Management. Volume 23, Number 3, Spring 2001

    Science.gov (United States)

    2001-01-01

    there are rights and freedoms to which every human is entitled, no matter where he or she lives. In this issue we offer the introduction to the report...Assistance Management INTRODUCTION The last DISAM Journal, Winter 2000/2001 Edition, provided an extensive description and analysis of the numerous...FY2001 Country/Program by ESF Budget ESF Geographical Region Funding Request Funding Partnerships to Eliminate Sweatshops 4.000 5.000 3.986 Environmental

  12. Waste Isolation Pilot Plant 2001 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions, Inc.

    2002-09-20

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  13. Waste Isolation Pilot Plant 2001 Site Environmental Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions, Inc.

    2002-01-01

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment

  14. Nuclear Safety and Radiation Protection in France in 2005; La surete nucleaire et la radioprotection en France en 2005. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-04-15

    In 2005, the Asn pursued its significant investment in radiation protection and reaffirms its ambition to become as efficient in radiation protection as it is in nuclear safety as of 2009. 2005 was a year of great progress for the Asn as it consolidated its organisation and working methods, in accordance with the 2005-2007 strategic plan it set for itself. The Asn continued progress in the field of radiation protection has given rise to various new regulations to improve the legislative and regulatory framework in this area. The Asn plans to step up its efforts to ensure better monitoring of patient exposure to ionizing radiation and to provide better management of radon-related risks, particularly in housing. Fully aware that its newfound power in this area requires outside evaluation, the Asn has asked the International Atomic Energy Agency (IAEA) to organize an I.R.R.S. (Integrated Regulatory Review Service) assignment consisting of a peer-conducted audit. The IAEA has confirmed that this audit will take place in November 2006. (N.C.)

  15. Crisis management: Planning for the inevitable

    Directory of Open Access Journals (Sweden)

    Niyaz Aboudzadeh

    2014-06-01

    Full Text Available The aim of this study is to identify important factors influencing organizational readiness to deal with the crisis in business organizations. The study designs a questionnaire in Likert scale and distributes it among some experts who work for Mapna company in Iran. The study uses the method developed by Mitroff (2005 [Mitroff, I. I. (2005. Why some companies emerge stronger and better from a crisis: 7 essential lessons for surviving disaster. AMACOM Div American Mgmt Assn.], which investigates the effects of four factors including job satisfaction, increase in income, cost reduction and change in strategies on crisis management. Using Pearson correlation ratio, the study has confirmed a positive and meaningful relationship between crisis management and three factors including increase in income, cost reduction and change in strategies. However, the study did not find any evidence to support the relationship between job satisfaction and crisis management.

  16. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  17. The French National Nutrition and Health Program: 2001-2006-2010.

    Science.gov (United States)

    Hercberg, Serge; Chat-Yung, Stacie; Chaulia, Michel

    2008-01-01

    Established in 2001-2005 then extended to 2010, the French National Nutrition and Health Program (PNNS) is a nutrition policy whose objective is to improve the health status of the population by acting on one of its major determinants, nutrition. Nine priority objectives focusing on diet, physical activity and nutritional status were determined. Program strategies are based on fundamental principles including food culture, pleasure, and gastronomy. This multidisciplinary program involves stakeholders from ministries, research and educational institutions, food industry, healthcare, and consumers. More than 75% of the public health actions planned were accomplished or in progress by the end of 2005, particularly those concerning nutrition communication, education, research and nutritional surveillance. Dietary guidelines were established and are now considered the official reference in France. Actions focusing on the healthcare system, economic actors and players and specific population groups need further development. The success of a public health program like the PNNS requires a combination of synergistic and complementary actions, measures, regulations and laws. A national study at the end of the PNNS will determine if objectives were achieved.

  18. Combining Human Resource and Stakeholder Management Perspectives

    DEFF Research Database (Denmark)

    Ravazzani, Silvia; Mormino, Sara

    2015-01-01

    This paper explores collaborative learning activities involving HR and external stakeholders that organizations decide to plan and implement in order to obtain benefits in terms of knowledge sharing, stakeholder understanding and value creation. The increasing uncertainty and multiplicity of comp...... and corporate learning in a stakeholder-oriented perspective can play a strategic role in supporting business strategy, providing organizations the resources to meet internal and external needs (Wilson, 2005) and to interconnect with their value network.......This paper explores collaborative learning activities involving HR and external stakeholders that organizations decide to plan and implement in order to obtain benefits in terms of knowledge sharing, stakeholder understanding and value creation. The increasing uncertainty and multiplicity...... of competitive pressures and stakeholder demands (Harrison, St. John, 1996) require organizations, and in particular HR, to take on a more strategic role aimed to build new capability and support the overarching business strategy (Ulrich, Beatty 2001). This study draws on Strategic Human Resource Management...

  19. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  20. Evaluation of the occupational exposure to external sources of ionizing radiation in Cuba in the period 2001-2005; Evaluacion de la exposicion ocupacional a fuentes externas de radiacion ionizante en Cuba en el periodo 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Molina P, D.; Martinez H, E.; Castro S, A. [Laboratorio de Dosimetria Externa, CPHR, A.P. 6195, C.P. 10600, La Habana (Cuba)]. e-mail: daniel@cphr.edu.cu

    2006-07-01

    The single radiological surveillance of the occupational exposure to external radiation sources in Cuba it is carried out by the Radiation Protection and Hygiene Center (CPHR). The data corresponding to the external exposure are presented. The service it covers to all the occupationally exposed workers (TOEs) of the country that work fundamentally the radiodiagnostic practices, nuclear medicine, radiotherapy and research. The purpose of this work is to carry out an analysis of the occupational exposures of the TOE of the country starting of the results registered by the service of single radiological surveillance in the period 2001 to 2005, keeping in mind the indicators used by the UNSCEAR. The annual average effective dose (E) for each practice is shown. The obtained results showed that the values of annual average effective dose (E) its are bigger for the radiodiagnostic practices, radiotherapy and nuclear medicine. In a general way, all the E values are inferior to 2.00 mSv. The number of TOEs that overcame the 20 mSv established as annual dose limit, it went inferior to 1% of the controlled total universe. (Author)

  1. Nuclear Safety and Radiation Protection in France in 2005

    International Nuclear Information System (INIS)

    2006-04-01

    In 2005, the Asn pursued its significant investment in radiation protection and reaffirms its ambition to become as efficient in radiation protection as it is in nuclear safety as of 2009. 2005 was a year of great progress for the Asn as it consolidated its organisation and working methods, in accordance with the 2005-2007 strategic plan it set for itself. The Asn continued progress in the field of radiation protection has given rise to various new regulations to improve the legislative and regulatory framework in this area. The Asn plans to step up its efforts to ensure better monitoring of patient exposure to ionizing radiation and to provide better management of radon-related risks, particularly in housing. Fully aware that its newfound power in this area requires outside evaluation, the Asn has asked the International Atomic Energy Agency (IAEA) to organize an I.R.R.S. (Integrated Regulatory Review Service) assignment consisting of a peer-conducted audit. The IAEA has confirmed that this audit will take place in November 2006. (N.C.)

  2. Human Capital Management Plan Fiscal Years 2003- 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-09

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that

  3. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  4. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  5. Observations on the National Aeronautics and Space Administration's Fiscal Year 1999 Performance Report and Fiscal Year 2001 Performance Plan

    National Research Council Canada - National Science Library

    2000-01-01

    As you requested, we have reviewed the 24 Chief Financial Officers (CFO) Act agencies' fiscal year 1999 performance reports and fiscal year 2001 performance plans required by the Government Performance and Results Act of 1993 (GPRA...

  6. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  7. ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING

    Energy Technology Data Exchange (ETDEWEB)

    Peggy Robinson

    2005-07-01

    This report summarizes activities that have taken place in the last six (6) months (January 2005-June 2005) under the DOE-NETL cooperative agreement ''Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields, New Mexico and Wyoming'' DE-FC26-02NT15445. This project examines the practices and results of cultural resource investigation and management in two different oil and gas producing areas of the United States: southeastern New Mexico and the Powder River Basin of Wyoming. The project evaluates how cultural resource investigations have been conducted in the past and considers how investigation and management could be pursued differently in the future. The study relies upon full database population for cultural resource inventories and resources and geomorphological studies. These are the basis for analysis of cultural resource occurrence, strategies for finding and evaluating cultural resources, and recommendations for future management practices. Activities can be summarized as occurring in either Wyoming or New Mexico. Gnomon as project lead, worked in both areas.

  8. Informe 2005

    Directory of Open Access Journals (Sweden)

    Red de Cuadernos de Investigación Urbanística

    2006-01-01

    The 2005 report gathers the researchs developed in the universities members of the Red de Cuadernos de Investigación Urbanística. As it is own of a number of this nature, the intentions are diverse: to provide aid spreading the themes researched, to propose ways to Doctors or teachers and to build a solid base of investigation about urban development planning and land management. Therefore, the aforementioned summaries have a common resolution, circumstance that shows the importance of facing new reflections about such a complex and dynamic discipline as it is urban planning. From the Universidad del Nordeste (Argentinacomes the study of the programmatic guidelines needed in a whole housing policy appointed to the social sectors affected by poverty. Coming from México, from Universidad Nacional Autónoma Metropolitana (UNAM, an analysis of the roles and absence of the green spaces in México City. Also from México, Universidad Iberoamericana de Puebla, researches around the process of urban development planning, framing its properties and faults. The third contribution from México, this time from the Universidad Veracruzana, is a reflection about history, theory and practice of urban planning between 1876 and 2000 including its implications and foreigner regardings. Last, the Universidad Politécnica de Madrid, España, contributes with a critical viewpoint about the concepts of sustainability, urban growth and life quality standards. The article finishes with some potential solutions from a responsible and ecological practice of urban development planning.

  9. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  10. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  11. Patterns of Radiotherapy Practice for Patients With Cervical Cancer in Japan, 2003-2005: Changing Trends in the Pattern of Care Process

    Energy Technology Data Exchange (ETDEWEB)

    Tomita, Natsuo, E-mail: ntomita@aichi-cc.jp [Department of Radiation Oncology, Aichi Cancer Center Hospital, Nagoya (Japan); Toita, Takafumi [Department of Radiology, Graduate School of Medical Science, University of the Ryukyus, Okinawa (Japan); Kodaira, Takeshi [Department of Radiation Oncology, Aichi Cancer Center Hospital, Nagoya (Japan); Shinoda, Atsunori [Department of Radiology, Shinshu University School of Medicine, Matsumoto (Japan); Uno, Takashi [Department of Radiology, Graduate School of Medicine, Chiba University, Chiba (Japan); Numasaki, Hodaka; Teshima, Teruki [Department of Medical Physics and Engineering, Graduate School of Medicine, Osaka University, Suita (Japan); Mitsumori, Michihide [Department of Radiation Oncology and Image-applied Therapy, Graduate School of Medicine, Kyoto University, Kyoto (Japan)

    2012-08-01

    Purpose: The patterns of care study (PCS) of radiotherapy for cervical cancer in Japan over the last 10 years was reviewed. Methods and Materials: The Japanese PCS working group analyzed data from 1,200 patients (1995-1997, 591 patients; 1999-2001, 324 patients; 2003-2005, 285 patients) with cervical cancer treated with definitive radiotherapy in Japan. Results: Patients in the 2001-2003 survey were significantly younger than those in the 1999-2001 study (p < 0.0001). Histology, performance status, and International Federation of Gynecology and Obstetrics stage were not significantly different among the three survey periods. Use of combinations of chemotherapy has increased significantly during those periods (1995-1997, 24%; 1999-2001, 33%; 2003-2005, 54%; p < 0.0001). The ratio of patients receiving concurrent chemotherapy has also dramatically increased (1995-1997, 20%; 1999-2001, 54%; 2003-2005, 83%; p < 0.0001). As for external beam radiotherapy (EBRT), the application rate of four-field portals has greatly increased over the three survey periods (1995-1997, 2%; 1999-2001, 7%; 2003-2005, 21%; p < 0.0001). In addition, the use of an appropriate beam energy for EBRT has shown an increase (1995-1997, 67%; 1999-2001, 74%; 2003-2005, 81%; p = 0.064). As for intracavitary brachytherapy (ICBT), an iridium source has become increasingly popular (1995-1997, 27%; 1999-2001, 42%; 2003-2005, 84%; p < 0.0001). Among the three surveys, the ratio of patients receiving ICBT (1995-1997, 77%; 1999-2001, 82%; 2003-2005, 78%) has not changed. Although follow-up was inadequate in each survey, no significant survival differences were observed (p = 0.36), and rates of late Grade 3 or higher toxicity were significantly different (p = 0.016). Conclusions: The Japanese PCS has monitored consistent improvements over the past 10 years in the application of chemotherapy, timing of chemotherapy, and EBRT methods. However, there is still room for improvement, especially in the clinical

  12. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply

    Science.gov (United States)

    Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  13. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply.

    Science.gov (United States)

    Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  14. Comparing goodwill before and after the changes in us gaap in 2001

    NARCIS (Netherlands)

    Lycklama à Nijeholt, M.P.; Grift, Y.K.; Blommaert, J.M.J.

    2012-01-01

    This study examines whether the introduction of SFAS 141 “Business Combinations” (2001) and SFAS 142 “Goodwill and other Intangible Assets” (2001) has led to more precise information about accounting goodwill in the financial statements of acquirers. Acquisitions in the period 1997-2005 between US

  15. Group EDF at a glance 2005

    International Nuclear Information System (INIS)

    2006-05-01

    The EDF Group is a leading player in the European energy industry, present in all areas of the electricity value chain, from generation to trading, and increasingly active in the gas chain in Europe. 2005 was a crucial year for EDF: growth in sales and a doubling of net income, the opening of the capital, the stepping up of our strategic development plan focused on Europe, a new public service agreement in France. This document presents the main points of the group activities in 2005: the group profile, the growing of the group, the solid position in France (sales and marketing, production and global warming, the radioactive wastes management and the business), consolidating positions in Europe and the international activities by pursuing a selective strategy. (A.L.B.)

  16. Planning and Management - the Most Neglected Activities in ...

    African Journals Online (AJOL)

    Lexicography has a long history of ineffective planning and inefficient management. This article applies the methods of general planning and management to the planning and management of a lexicographic unit. Keywords: Planning, management, mission statement, strategic focus Areas, performance areas, situational ...

  17. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  18. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  19. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  20. Progress report: nuclear safety and radiation protection in France in 2005; Rapport annuel: la surete nucleaire et la radioprotection en France en 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The Asn (Nuclear safety authority) considers that 2005 was a satisfactory year in terms of nuclear safety and radiation protection. However, further progress can and must be made. 2005 was a year of great progress for the Asn as it consolidated its organisation and working methods, in accordance with the 2005-2007 strategic plan it set for itself. The Asn continued progress in the field of radiation protection has given rise to various new regulations to improve the legislative and regulatory framework in this area. 2005 was marked by significant progress in the process of harmonizing national nuclear safety policies Against a backdrop of the preparation of a bill on management of radioactive materials and waste, to be presented to Parliament in March 2006, 2005 was a year of important milestones. The Asn control activities encompass the following seven areas: development of general regulations for nuclear safety and radiation protection; management of individual authorization requests and receipt of declarations; inspection of nuclear activities; organisation of radiological surveillance of individuals and of the environment; preparation for management of emergency situations and implementation if necessary; contribution to public information on nuclear safety and radiation protection; determination of the French position within international community. Main topics in 2005: government bill on transparency and security in the nuclear field; the challenges and ambitions of the Asn; controlling exposure to radon; EPR Reactor Project Safety; working towards a law on radioactive waste in 2006; I.R.R.T.: an international audit of Asn in 2006; harmonization of nuclear safety in Europe; Chernobyl: what has been achieved over the past 20 years; informing the Public; internal authorizations. (N.C.)

  1. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  2. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  3. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  4. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  5. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  6. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  7. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  8. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  9. 2001 OE 84

    Czech Academy of Sciences Publication Activity Database

    Pravec, Petr; Kušnirák, Peter

    č. 7735 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : asteroids * monoliths * photometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  10. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  11. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  12. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  13. Conclusions of the Ad-hoc Review Committee (ARC) on the International Commission on Stratigraphy (ICS) of the International Union of Geological Sciences (IUGS) (Paris, 7-8 November 2005)

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ Background Following the recommendations of the IUGS Strategic Planning Committee (2000) and IUGS Strategic Action Plan (2001)to appoint Ad-hoc Review Committees (ARCs) to hold reviewsof all IUGS-funded scientific activities on a regular basis, theIUGS Executive Committee decided at its last meeting in Vilnius, Lithuania (March 2005) that an ARC should be convened toreview the IUGS International Commission on. Stratigraphy(ICS). ICS has been part of IUGS since 1965, and the last reviewof ICS by the IUGS was in 1995.

  14. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  15. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  16. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  17. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  18. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  19. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  20. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  1. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  2. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  3. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014......maximum 200 words) Navy Supply Systems Command (NAVSUP) lacks a business process framework for the development of Business Continuity Management

  4. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  5. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  6. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  7. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  8. AM data activities (1999-2001) at Data and Planning Center, National Institute for Fusion Science, Japan

    Energy Technology Data Exchange (ETDEWEB)

    Murakami, I [DPC, NIFS (Japan)

    2001-12-01

    In this report recent work at the Data and Planning Center, NIFS, consisting of compilation activities, research and collaboration programmes, data publications, and future plans, is presented. The NIFS website and services, the status of data records in the numerical databases (AMDIS, CHART, SPUTY and BACKS) and bibliographic databases are reviewed. These databases are accessed through the www and require a simple user registration process. The new database on recombination processes has been constructed and contains 26000 records for cross sections and rate coefficients for radiative, dielectronic or three-body recombination. New numerical databases in progress in 2001 include impact and ion/atom/molecule impact for molecular processes and autoionization.

  9. AM data activities (1999-2001) at Data and Planning Center, National Institute for Fusion Science, Japan

    International Nuclear Information System (INIS)

    Murakami, I.

    2001-01-01

    In this report recent work at the Data and Planning Center, NIFS, consisting of compilation activities, research and collaboration programmes, data publications, and future plans, is presented. The NIFS website and services, the status of data records in the numerical databases (AMDIS, CHART, SPUTY and BACKS) and bibliographic databases are reviewed. These databases are accessed through the www and require a simple user registration process. The new database on recombination processes has been constructed and contains 26000 records for cross sections and rate coefficients for radiative, dielectronic or three-body recombination. New numerical databases in progress in 2001 include impact and ion/atom/molecule impact for molecular processes and autoionization

  10. The Modern Management of Urban Planning and the Controlling Planning

    Institute of Scientific and Technical Information of China (English)

    1991-01-01

    <正> Since 1980s,with the further reform of political and economic systems,the urban construc-tion in our country has undergone great changes,greater than ever.Such changes pose a series ofnew problems to urban planning:How should planning be suitable for the development of moderncities?How should planning management coordinate with urban planning?How to carry out ur-ban planning under new situations? etc.The answers to these problems lie in one point:urbanplanning and plann ing management must be restructured.Only when the former is well com-bined with the latter can the above problems be solved satisfactorily.This article provides someviews in this respect.

  11. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  12. Impact of standardized clinical assessment and management plans on resource utilization and costs in children after the arterial switch operation.

    Science.gov (United States)

    Rathod, Rahul H; Jurgen, Brittney; Hamershock, Rose A; Friedman, Kevin G; Marshall, Audrey C; Samnaliev, Mihail; Graham, Dionne A; Jenkins, Kathy; Lock, James E; Powell, Andrew J

    2017-12-01

    Standardized Clinical Assessment and Management Plans (SCAMPs) are a quality improvement initiative designed to reduce unnecessary utilization, decrease practice variation, and improve patient outcomes. We created a novel methodology, the SCAMP managed episode of care (SMEOC), which encompasses multiple encounters to assess the impact of the arterial switch operation (ASO) SCAMP on total costs. All ASO SCAMP patients (dates March 2009 to July 2015) were compared to a control group of ASO patients (January 2001 to February 2009). Patients were divided into "younger" (operation while maintaining quality of care. © 2017 Wiley Periodicals, Inc.

  13. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  14. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  15. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  16. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  17. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  18. Management Cycle: from Planning to Evaluation

    OpenAIRE

    Kova?i?, Luka; Jakši?, Želimir

    2008-01-01

    The planning process in health care known as management cycle or cycle of organization and management is described. The cycle is divided in four main elements: planning, organization, implementation and evaluation. Each element is defined and described.

  19. Nurse manager succession planning: synthesis of the evidence.

    Science.gov (United States)

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  20. Development and implementation of a watershed management plan forLlac la Biche, Alberta, Canada.

    Science.gov (United States)

    White, J; Logan, M; Rawles, M

    2006-01-01

    Lakeland County is experiencing increasing developmental pressures arising from the oil and gas boom at nearby Fort McMurray. There is increased industrial traffic passing through the county, and 600 new residential lots are proposed in 2005, almost double from 5 years ago. Deteriorating surface water quality has been a concern in the area due to an increase in development and agriculture, while excessive fish harvesting and winterkills have impacted commercial and recreational fisheries. Today, walleye and pike populations in the lake remain collapsed and restocking efforts have not been successful. Due to the lack of studies done on the watershed, the county is leading a multidisciplinary research study which includes a baseline water quality study, riparian health assessments, land use mapping and ground-truthing and projects with the local health authority. This research has been summarized in a comprehensive state of the watershed report, which will be used to complete a watershed management plan for the Lac la Biche watershed. Recommendations from the state of the watershed report and watershed management plan will also be incorporated into municipal planning documents and recommend changes to the Municipal Government Act itself.

  1. Academic Librarian Competency as Defined in the Library and Information Science Journal Literature of 20012005 and 2011

    Directory of Open Access Journals (Sweden)

    Jennifer Lyn Soutter

    2013-03-01

    Full Text Available Competency definitions continue to become more popular in Library and Information Science (LIS and are being used not only to describe library positions but also as a means of assessment. This study investigates competency in the LIS academic context using English language peer-reviewed articles from the LIS journal literature for 20012005, with findings tested by the later inclusion of 2011 data. A quadripartite definition consisting of cognitive, functional, behavioral, and meta-competence elements is used as a template against which to explore definition creation and use. Results offer a template for critical analysis of competency as found within the LIS journal literature. The methodology used, one of coding, reveals a commonality to discussions of competency within these articles — reflecting a more holistic understanding than expected. But authors’ highlighted competency definitions tend not to parallel the discussion in their respective articles, as shown by the lack of inclusion of multiple elements from the same quadripartite definition.

  2. Sustainable Forest Management in Cameroon Needs More than Approved Forest Management Plans

    Directory of Open Access Journals (Sweden)

    Paolo Omar. Cerutti

    2008-12-01

    Full Text Available One of the main objectives of the 1994 Cameroonian forestry law is to improve the management of production forests by including minimum safeguards for sustainability into compulsory forest management plans. As of 2007, about 3.5 million hectares (60% of the productive forests are harvested following the prescriptions of 49 approved management plans. The development and implementation of these forest management plans has been interpreted by several international organizations as long awaited evidence that sustainable management is applied to production forests in Cameroon. Recent reviews of some plans have concluded, however, that their quality was inadequate. This paper aims at taking these few analyses further by assessing the actual impacts that approved management plans have had on sustainability and harvesting of commercial species. We carry out an assessment of the legal framework, highlighting a fundamental flaw, and a thorough comparison between data from approved management plans and timber production data. Contrary to the principles adhered to by the 1994 law, we find that the government has not yet succeeded in implementing effective minimum sustainability safeguards and that, in 2006, 68% of the timber production was still carried out as though no improved management rules were in place. The existence of a number of approved management plans cannot be used a proxy for proof of improved forest management.

  3. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  4. The associations between nationality, fertility history and diabetes-related mortality: a retrospective cohort study in the Brussels-Capital Region (2001-2005).

    Science.gov (United States)

    Vandenheede, Hadewijch; Deboosere, Patrick; Gadeyne, Sylvie; De Spiegelaere, Myriam

    2012-03-01

    The relationship between women's parity and diabetes mortality has been investigated in several studies, with mixed results. This study aims to establish if parity and age at first birth are associated with diabetes-related mortality and if these factors contribute to variations in diabetes-related mortality among women with different nationalities. Data of the 2001 census are linked to registration records of all deaths and emigrations (period 2001-2005). The study population comprises all female inhabitants of the Brussels-Capital Region aged 45-74 of either Belgian or North African nationality (n = 108 296). Age-standardized mortality rates (direct standardization) and mortality rate ratios (Poisson's regression) are computed. Both parity and age at first birth are associated with diabetes-related mortality. Highest risks of dying from diabetes are observed among grandmultiparous women and teenage mothers. Differences in diabetes-related mortality according to nationality are observed. Age-standardized diabetes mortality rates are higher in North African [ASMR = 417.4/100,000; 95% confidence interval (CI) 227.2-607.7] than in Belgian women (ASMR = 184.0/100,000; 95% CI 157.3-210.8). Taking parity, age at first birth and education into account, these differences largely disappear. Reproductive factors are associated with diabetes-related mortality and play an important part in the higher diabetes-related mortality of North African compared with Belgian women.

  5. A review of fast reactor program in Japan (April 2001 - March 2002)

    International Nuclear Information System (INIS)

    Nagata, T.; Ieda, Y.

    2002-01-01

    This report describes the research and development activities on fast reactors in Japan thru April 2001 to March 2002. In December 2001, the Cabinet decided the Plan for Reorganization of Government-funded Corporations including the merger of JNC and the Japan Atomic Energy Research Institute (JAERI). A law to set up a new entity is supposed to be submitted to the National Diet by the Japanese Fiscal Year (JFY) 2004. In the Experimental Fast Reactor Joyo, thirty-five duty cycle operations and thirteen special tests with the MK-II core were completed by June 2000 without any fuel pin failures or serious plant trouble. The reactor is currently being upgraded to the MK-III core. Though a fire broke out in the maintenance building of Joyo in October 2001, the Mk-III construction work was restarted in February 2002. In the Prototype Fast Breeder Reactor Monju, countermeasures against sodium leakage have already been drawn up based on Monju comprehensive safety review. The safety licensing examination for the plant modification of Monju is undergoing. As for the Feasibility Study on Commercialized Fast Reactor Cycle Systems, JFY2001 was the first year of its second phase. A three-year period from JFY2001 to 2003 is the initial term of this phase. During this term, research activities are being focused on the design of the candidate concepts and fundamental tests of key technologies. An interim summary of these activities will be checked and reviewed, and based on the results; the research for JFY 2004 to 2005 will be conducted in order to narrow down the number of alternatives for the fast reactor cycle. (author)

  6. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  7. Annual and activity report 2005 - INB - Brazilian Nuclear Industries. Nuclear fuel: technology for the essential

    International Nuclear Information System (INIS)

    2005-01-01

    This document reports the activities of Brazilian Nuclear Industry company during 2005 as follows: uranium isotope enrichment; production of nuclear fuel; mineral resources; finance and administration; planning and sales; quality, safety and environment, communication and social action; economic and financial management

  8. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  9. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  10. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  11. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  12. 2001 activity report; Rapport d'activite 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Managing radioactive waste for a better control in the future. The Quadrennial State/Andra contract, the double ISO 9001 (quality) and ISO 140001 (environment) certification and three diversified missions: industry, research and information. Those are the highlights of the activity report where the reader will be able to learn more about the Agency's major achievements in 2001. An appendix contains the management report of the Agency.

  13. 76 FR 53149 - North American Waterfowl Management Plan

    Science.gov (United States)

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  14. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  15. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  16. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  17. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  18. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  19. Forschungszentrum Karlsruhe Technik und Umwelt. Program budget for research and development 2001. Planning period 2001 - 2004

    International Nuclear Information System (INIS)

    2000-11-01

    The Karlsruhe Research Center is a national research center founded and substantially funded by the German Federal Government and the Land government of Baden-Wuerttemberg, the federal state where it is located. It is a member of the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren and is one of the most important, independent research centers in Germany working in the fields of the natural sciences and engineering sciences. The Center's R and D programmes encompass research activities up to pre-industrial scale as well as product and process development, research for precautionary policy and purposes, and fundamental research. The focal points of the R and D programme 2001 are explained under the following subject titles: - Environment - Public Health - Energy - Key Technologies - Fundamental Research. The programme reveals the shift of emphasis of activities which commenced in the early 1980s, away from nuclear engineering as the major focus in the early days towards a much wider spectrum of activities today, characterized by aspects such as complexity of tasks, long-term planning, and the need for cross-disciplinary and multilateral cooperation. The second volume of the publication explains the programme budget and apportionment of funds. (orig./CB) [de

  20. Comet 2001 Q2

    Czech Academy of Sciences Publication Activity Database

    Pravec, Petr; Kušnirák, Peter; Bouma, R. J.; Raymundo, P. M.

    č. 7687 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  1. Progress report: nuclear safety and radiation protection in France in 2005

    International Nuclear Information System (INIS)

    2007-01-01

    The Asn (Nuclear safety authority) considers that 2005 was a satisfactory year in terms of nuclear safety and radiation protection. However, further progress can and must be made. 2005 was a year of great progress for the Asn as it consolidated its organisation and working methods, in accordance with the 2005-2007 strategic plan it set for itself. The Asn continued progress in the field of radiation protection has given rise to various new regulations to improve the legislative and regulatory framework in this area. 2005 was marked by significant progress in the process of harmonizing national nuclear safety policies Against a backdrop of the preparation of a bill on management of radioactive materials and waste, to be presented to Parliament in March 2006, 2005 was a year of important milestones. The Asn control activities encompass the following seven areas: development of general regulations for nuclear safety and radiation protection; management of individual authorization requests and receipt of declarations; inspection of nuclear activities; organisation of radiological surveillance of individuals and of the environment; preparation for management of emergency situations and implementation if necessary; contribution to public information on nuclear safety and radiation protection; determination of the French position within international community. Main topics in 2005: government bill on transparency and security in the nuclear field; the challenges and ambitions of the Asn; controlling exposure to radon; EPR Reactor Project Safety; working towards a law on radioactive waste in 2006; I.R.R.T.: an international audit of Asn in 2006; harmonization of nuclear safety in Europe; Chernobyl: what has been achieved over the past 20 years; informing the Public; internal authorizations. (N.C.)

  2. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  3. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  4. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  5. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  6. Advanced Education Business Plan 2005-2008

    Science.gov (United States)

    Alberta Advanced Education, 2005

    2005-01-01

    In collaboration with learning providers, the advanced education system, industry, communities, government agencies and non-governmental organizations, Advanced Education strives to create accessible, affordable and quality learning opportunities that are responsive to the ongoing learning needs of Albertans. The Ministry's 2005-08 Business Plan…

  7. 40 CFR 763.93 - Management plans.

    Science.gov (United States)

    2010-07-01

    ... implementation in a timely fashion. (d) Each local education agency shall maintain and update its management plan... surveillance and training. (12) With respect to each consultant who contributed to the management plan, the name of the consultant and one of the following statements: (i) If the State has adopted a contractor...

  8. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  9. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  10. Sustainable development report 2005; Rapport developpement durable 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The Gaz de France strategic choices and management systems have long been inspired by the principles of sustainable development. This document presents the involvement of the Group in this policy: the profile of the gaz de France group, the highlights 2005, from the strategy to the action, the corporate culture of sharing and the dialogue, the corporate governance, the performance 2005 and indicators and external evaluation. (A.L.B.)

  11. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  12. Finnish Research Programme on Nuclear Waste Management (KYT). Framework Programme for 2002-2005

    International Nuclear Information System (INIS)

    Rasilainen, K.

    2002-12-01

    The new Finnish research programme on nuclear waste management (KYT) will be conducted in 2002 - 2005. This framework programme describes the starting point, the basic aims and the organisation of the research programme. The starting point of the KYT programme is derived from the present state and future challenges of Finnish nuclear waste management. The research programme is funded mainly by the Ministry of Trade and Industry (KTM), the Radiation and Nuclear Safety Authority (STUK), Posiva Oy, Fortum Oyj, Teollisuuden Voima Oy (TVO), and the National Technology Agency (Tekes). As both regulators and implementors are involved, the research programme concentrates on neutral research topics that must be studied in any case. Methods and tools for experimental and theoretical studies fall in this category. State of the art -reviews on relevant topics also create national know-how. Topics that directly belong to licensing activities of nuclear waste management are excluded from the research programme. KYT carries out technical studies that increase national know-how in the area of nuclear waste management. The aim is to maintain and develop basic expertise needed in the operations derived from the national nuclear waste management plan. The studies have been divided into strategic studies and studies enhancing the long-term safety of spent nuclear fuel disposal. Strategic studies support the overall feasibility of Finnish nuclear waste management. These studies include basic options and overall safety principles related to nuclear fuel cycle and nuclear waste management. In addition, general cost estimates as well as general safety considerations related to transportations, low- and medium level wastes, and decommissioning are included in strategic studies. Studies supporting the long-term safety of spent fuel disposal include issues related to performance assessment methodology, release of radionuclides from the repository, behaviour of bedrock and groundwater

  13. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  14. Sandia National Laboratories California Environmental Monitoring Program Annual Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2006-02-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 Update program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  15. Trends in Food Habits and Their Relation to Socioeconomic Status among Nordic Adolescents 2001/2002-2009/2010

    DEFF Research Database (Denmark)

    Fismen, Anne-Siri; Smith, Otto Robert Frans; Torsheim, Torbjørn

    2016-01-01

    , collected via three nationally representative and comparable questionnaire surveys in 2001/2002, 2005/2006 and 2009/2010. Food habits were identified by students' consumption of fruit, vegetables, sweets and sugar sweetened soft drink. Socioeconomic status (SES) was measured with the Family Affluence Scale...... at national level. In recent years, social inequalities in food habits have been attracted particular governmental interest and several initiatives addressing the socioeconomic gradient in food habits have been highlighted. However, few internationally published studies have evaluated how trends....../2002-2005/2006 and was stable thereafter. Denmark displayed an increase between 2001/2002-2005/2006 followed by a similar decrease between 2005/2006-2009/2010 for both sweet and soft drink consumption. Socioeconomic inequalities in fruit and vegetable consumption were observed in all countries, with no cross...

  16. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  17. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  18. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  19. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  20. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  1. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  2. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  5. Carbon budget of Ontario's managed forests and harvested wood products, 2001–2100

    Science.gov (United States)

    Jiaxin Chen; Stephen J. Colombo; Michael T. Ter-Mikaelian; Linda S. Heath

    2010-01-01

    Forest and harvested wood products (HWP) carbon (C) stocks between 2001 and 2100 for Ontario's managed forests were projected using FORCARB-ON, an adaptation of the U.S. national forest C budget model known as FORCARB2. A fire disturbance module was introduced to FORCARB-ON to simulate the effects of wildfire on C, and some of the model's C pools were re-...

  6. ASTRONET: Strategic Planning for European Astronomy 2005-2025

    Science.gov (United States)

    Andersen, Johannes; Mourard, Denis

    2015-08-01

    European astronomy, with ESO and ESA, is supported by a wide variety of independent national agencies or similar bodies, which jointly provide ~98% of the total funding (with ~2% EU grants). In 2005 these agencies concluded that common strategic planning would be a more cost-effective approach, so they founded a consortium, ASTRONET (http://www.astronet-eu.org/), to prototype such an effort for all of Europe, with EU support. A bottom-up process resulted in a Science Vision (2007) and Infrastructure Roadmap (2008) for European astronomy, with recent updates (2014).These ASTRONET reports cover all branches of astronomy; infrastructures at all electromagnetic wavelengths as well as particles etc., on the ground and in space; laboratory work, software and archiving; and training, recruitment and public outreach. In short, they are agreed blueprints for what Europe plans to accomplish in the next 1-2 decades.Subsequently, a systematic and sustained pragmatic effort has been made to implement the strategy laid out in the Roadmap, including a common European participation in projects and facilities of global dimensions. Decisions on the organisation and construction of several major research facilities have been taken as foreseen (E-ELT, SKA, CTA,…), and they are on track for completion around 2025. The task for global astronomy is now to optimise the overall scientific returns and cost-effectiveness of these investments across wavelength domains, scientific disciplines, and political and financial borders. Accordingly, ASTRONET is currently transforming itself into a permanent, self-sustaining activity reaching out to the world.The ideal of a fully integrated global astronomy may not be reached until ~2050, but no science is better suited than astronomy to set such an example: One Universe surrounds us all, and one Earth is our platform. The IAU General Assembly is a springboard towards this goal.

  7. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  8. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  9. Influência de variáveis climáticas sobre a incidência de meningite e sua distribuição espacial no município de Ponta Grossa - PR, 2001-2005 Influence of climatic variables on the incidence of meningitis and its space distribution in the city of Ponta Grossa-PR, 2001-2005

    Directory of Open Access Journals (Sweden)

    Caroliny Stocco

    2010-03-01

    Full Text Available Os elementos climáticos têm destacada influência sobre a manifestação de muitas doenças nos seres humanos. Assim, o objetivo deste estudo foi avaliar a influência de variáveis climáticas locais sobre a incidência mensal de meningite no Município de Ponta Grossa, Paraná, no período de 2001 a 2005, assim como distribuir espacialmente sua ocorrência na área urbana. A amostra inicial foi composta de 401 casos notificados e confirmados de indivíduos residentes nesse município. Verificou-se forte correlação entre a incidência média mensal de meningite e as variáveis climáticas temperatura média do ar, precipitação pluviométrica e umidade relativa do ar na maioria dos meses. A distribuição espacial dos casos em estudo revelou maior concentração nas porções centro-oeste e centro-norte da cidade.Climatic elements have an important influence on the manifestation of many human diseases. The objective of this study was to evaluate the influence of local climate variables on the monthly incidence of meningitis in the city of Ponta Grossa, State of Paraná, in the period from 2001 to 2005, and to spatially distribute its occurrence in the urban area. The initial sample was composed of 401 notified cases which were confirmed as being of resident citizens in this city. Strong correlation was verified between the average monthly incidence of meningitis and the following climate variables: mean air temperature, precipitation and relative humidity in most months. The spatial distribution of the cases under study showed higher concentration in the central-west and north-central portions of the city.

  10. 40 CFR 60.2899 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  11. Observations on the U.S. Agency for International Development's Fiscal Year 1999 Performance Report and Fiscal Years 2000 and 2001 Performance Plans

    National Research Council Canada - National Science Library

    2000-01-01

    As you requested, we have reviewed the 24 Chief Financial Officers (CFO) Act agencies' fiscal year 1999 performance reports and fiscal year 2001 performance plans required by the Government Performance and Results Act of 1993 (GPRA...

  12. [Evaluating cost/equity in the Colombian health system, 1998-2005].

    Science.gov (United States)

    Eslava-Schmalbach, Javier; Barón, Gilberto; Gaitán-Duarte, Hernando; Alfonso, Helman; Agudelo, Carlos; Sánchez, Carolina

    2008-01-01

    An economic analysis of cost-equity (from society's viewpoint) for evaluating the impact of Law 100/93 in Colombia between 1998 and 2005. An economic analysis compared costs and equity in health in Colombia between 1998 and 2005. Data was taken from the Colombian Statistics' Administration Department ( Departamento Administrativo Nacional de Estadistica - DANE) and from national demographic and health surveys carried out in 2000 and 2005. Information regarding costs was taken from the National Health Accounts' System. Inequity in Health was considered in line with the Inequity in Health Index (IHI). Incremental and average cost-equity analysis covered three sub-periods; 1998-1999 (during which time per capita gross internal product became reduced in Colombia ), 2000-2001 (during which time total health expense became reduced) and 2001 -2005. An unstable tendency for inequity in health becoming reduced during the period was revealed. There was an inverse relationship between IHI and public health spending and a direct relationship between out-of-pocket spending on health and equity in health (Spearman, p<0.05). The second period had the best incremental cost-equity ratio. Fluctuations in IHI and marginal cost-equity during the periods being analysed suggested that health spending depended on equity in health in Colombia during the period being studied.

  13. National Aeronautics and Space Administration FY 2001 Accountability Report

    Science.gov (United States)

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this Report.

  14. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  15. Estonie 2004-2005 : y a-t-il un pilote dans l'avion? / Antoine Chalvin

    Index Scriptorium Estoniae

    Chalvin, Antoine

    2005-01-01

    Ülevaade sündmustest Eesti poliitikas ja majanduses: valitsuskoalitsiooni lagunemine, sotsiaalpoliitika ning tervishoiu probleemid, Eesti-Vene piirileping, majandusnäitajad, Eesti-Prantsusmaa suhted, EL-iga liitumise mõjud. Tabelid. Lisad: Eesti poliitiliste sündmuste kronoloogia 2004-2005; Valimistulemused alates 2001; Valitsuse koosseis juunis 2005

  16. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  17. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  18. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  19. Evaluation of the occupational exposure to external sources of ionizing radiation in Cuba in the period 2001-2005

    International Nuclear Information System (INIS)

    Molina P, D.; Martinez H, E.; Castro S, A.

    2006-01-01

    The single radiological surveillance of the occupational exposure to external radiation sources in Cuba it is carried out by the Radiation Protection and Hygiene Center (CPHR). The data corresponding to the external exposure are presented. The service it covers to all the occupationally exposed workers (TOEs) of the country that work fundamentally the radiodiagnostic practices, nuclear medicine, radiotherapy and research. The purpose of this work is to carry out an analysis of the occupational exposures of the TOE of the country starting of the results registered by the service of single radiological surveillance in the period 2001 to 2005, keeping in mind the indicators used by the UNSCEAR. The annual average effective dose (E) for each practice is shown. The obtained results showed that the values of annual average effective dose (E) its are bigger for the radiodiagnostic practices, radiotherapy and nuclear medicine. In a general way, all the E values are inferior to 2.00 mSv. The number of TOEs that overcame the 20 mSv established as annual dose limit, it went inferior to 1% of the controlled total universe. (Author)

  20. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  1. Appointment with Climate 2005; Rendez-vous climat 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This document takes stock on the situation one year after the Climate Plan decided by the government in July 2004. It provides the allocutions of politicians occurred during the 14 and 15 November 2005 and a synthesis of the main questions and problems discussed during these two days. (A.L.B.)

  2. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP

  3. 40 CFR 62.14580 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  4. LBA-ECO LC-22 Post-deforestation Land Use, Mato Grosso, Brazil: 2001-2005

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides (1) areal estimates of deforestation events (>25 ha) that were identified from 2001-2004 in Mato Grosso by the Brazilian...

  5. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    Bončina, Andrej; Čavlović, Juro

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  6. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  7. Survey of roadside alien plants in Hawai`i Volcanoes National Park and adjacent residential areas 2001-2005

    Science.gov (United States)

    Bio, Keali'i F.; Pratt, Linda W.; Jacobi, James D.

    2012-01-01

    The sides of all paved roads of Hawai`i Volcanoes National Park (HAVO) were surveyed on foot in 2001 to 2005, and the roadside presence of 240 target invasive and potentially invasive alien plant species was recorded in mile-long increments. Buffer zones 5–10 miles (8–16 km) long along Highway 11 on either side of the Kīlauea and Kahuku Units of the park, as well as Wright Road that passed by the disjunct `Ōla`a Tract Unit, were included in the survey. Highway 11 is the primary road through the park and a major island thoroughfare. Three residential subdivisions adjacent to the park were similarly surveyed in 0.5–1 mile (0.8–1.6 km) intervals in 2003, and data were analyzed separately. Two roads to the east and northeast were also surveyed, but data from these disjunct areas were analyzed separately from park roads. In total, 174 of the target alien species were observed along HAVO roads and buffers, exclusive of residential areas, and the mean number of target aliens per mile surveyed was 20.6. Highway 11 and its buffer zones had the highest mean number of target alien plants per mile (26.7) of all park roads, and the Mauna Loa Strip Road had the lowest mean (11.7). Segments of Highway 11 adjacent to HAVO and Wright Road next to `Ōla`a Tract had mean numbers of target alien per mile (24–47) higher than those of any internal road. Alien plant frequencies were summarized for each road in HAVO. Fifteen new records of vascular plants for HAVO were observed and collected along park roads. An additional 28 alien plant species not known from HAVO were observed along the buffer segments of Highway 11 adjacent to the park. Within the adjacent residential subdivisions, 65 target alien plant species were sighted along roadsides. At least 15 potentially invasive species not currently found within HAVO were observed along residential roads, and several other species found there have been previously eliminated from the park or controlled to remnant populations

  8. LBA-ECO LC-22 Post-deforestation Land Use, Mato Grosso, Brazil: 2001-2005

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides (1) areal estimates of deforestation events (>25 ha) that were identified from 2001-2004 in Mato Grosso by the Brazilian Institute for...

  9. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  10. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  11. The use of physician-patient email: a follow-up examination of adoption and best-practice adherence 2005-2008.

    Science.gov (United States)

    Menachemi, Nir; Prickett, Charles T; Brooks, Robert G

    2011-02-25

    Improved communication from physician- patient emailing is an important element of patient centeredness. Physician-patient email use has been low; and previous data from Florida suggest that physicians who email with patients rarely implement best-practice guidelines designed to protect physicians and patients. Our objective was to examine whether email use with patients has changed over time (2005-2008) by using two surveys of Florida physicians, and to determine whether physicians have more readily embraced the best-practice guidelines in 2008 versus 2005. Lastly, we explored the 2008 factors associated with email use with patients and determined whether these factors changed relative to 2005. Our pooled time-series design used results from a 2005 survey (targeting 14,921 physicians) and a separate 2008 survey (targeting 7003 different physicians). In both years, physicians practicing in the outpatient setting were targeted with proportionally identical sampling strategies. Combined data from questions focusing on email use were analyzed using chi-square analysis, Fisher exact test, and logistic regression. A combined 6260 responses were available for analyses, representing a participation rate of 28.2% (4203/14,921) in 2005 and 29.4% (2057/7003) in 2008. Relative to 2005, respondents in 2008 were more likely to indicate that they personally used email with patients (690/4148, 16.6% vs 408/2001, 20.4%, c(2) (1) = 13.0, P email with patients did not change from 2005 to 2008 (2.9% vs 59/2001, 2.9%). Interest among physicians in future email use with patients was lower in 2008 (58.4% vs 52.8%, c(2) (2) = 16.6, P email best practices remained low in 2008. When comparing 2005 and 2008 adherences with each of the individual guidelines, rates decreased over time in each category and were significantly lower for 4 of the 13 guidelines. Physician characteristics in 2008 that predicted email use with patients were different from 2005. Specifically, in multivariate analysis

  12. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  13. Dificuldade de aprendizagem: principais abordagens terapêuticas discutidas em artigos publicados nas principais revistas indexadas no LILACS de fonoaudiologia no período de 2001 a 2005 Learning difficulties: main therapeutic approaches in articles published in the main speech therapy journals from 2001 to 2005 - indexed on Lilacs

    Directory of Open Access Journals (Sweden)

    Tereza Cristina Ferraz de Lima

    2007-12-01

    Full Text Available OBJETIVO: verificar artigos referentes às dificuldades de aprendizagem, tendo como objetivos específicos classificar o tipo de artigo, além de analisar a abordagem e a nomenclatura utilizada para identificação dos problemas de aprendizagem, pelos autores dos mesmos, nas revistas de 2001 a 2005 com indexação no LILACS. MÉTODOS: foram selecionados artigos com base nas seguintes palavras chaves: dificuldade de aprendizagem, distúrbio de aprendizagem, dificuldade de leitura e/ou escrita, dislexia, disortografia e disgrafia. RESULTADOS: o tipo de artigo mais publicado foi artigo original, seguido de estudo de caso. A principal nomenclatura utilizada pelos autores foram distúrbios ou dificuldades de aprendizagem, e a abordagem mais citada foi aquela que contempla a consciência fonológica. Verificou-se 207 artigos em linguagem, sendo 22 referentes ao tema desse trabalho. CONCLUSÃO: existe uma escassez de publicação de trabalhos na área de linguagem, principalmente ao tema relacionado à dificuldade de aprendizagem que talvez seja explicado pela falta de consenso entre os autores, levando tanto a uma dificuldade diagnóstica como terapêutica.PURPOSE: to check articles regarding learning difficulties, with the specific objectives of classifying the type of article as well as analyzing the approach and nomenclature that the authors used in the identification of learning problems in publications from 2001 to 2005 - indexed on LILACS. METHODS: survey of articles taking into consideration the following key words: learning difficulty, learning disability, reading and/or writing difficulty, dyslexia, dysortography and dysgraphy. RESULTS: original article was the most published, followed by case study. The main nomenclature that the authors used were "learning disability" or "learning difficulty", and the most cited approach was the one addressing phonological awareness. We observed 207 articles on language, 22 of these articles referred to the

  14. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  15. Nuclear and isotopic techniques for the characterization of submarine groundwater discharge in coastal zones. Results of a coordinated research project 2001-2006

    International Nuclear Information System (INIS)

    2007-07-01

    Submarine groundwater discharge (SGD) is now recognized as an important pathway between land and sea. As such, this flow may contribute to the biogeochemical and other marine budgets of nearshore waters. These discharges typically display significant spatial and temporal variability, making direct assessments difficult. Groundwater seepage is patchy, diffuse, temporally variable, and may involve multiple aquifers. Thus, the measurement of its magnitude and associated chemical fluxes is a challenging enterprise. An initiative on SGD characterization was developed by the IAEA and UNESCO in 2000 as a 5-year plan to assess methodologies and importance of SGD for coastal zone management. The IAEA component included a Coordinated Research Project (CRP) on Nuclear and Isotopic Techniques for the Characterization of Submarine Groundwater Discharge (SGD) in Coastal Zones, carried out jointly by the IAEA's Isotope Hydrology Section in Vienna and the Marine Environment Laboratory in Monaco, together with 9 laboratories from 8 countries. In addition to the IAEA, the Intergovernmental Oceanographic Commission (IOC) and the International Hydrological Programme (IHP) have provided support. This overall effort originally grew from a project sponsored by the Scientific Committee on Ocean Research (SCOR) who established a Working Group (112) on SGD. The activities included joint meetings (Vienna 2000, 2002, and 2005; Syracuse, Italy, 2001; and Monaco 2004), sampling expeditions (Australia 2000; Sicily 2001 and 2002; New York 2002; Brazil 2003; and Mauritius 2005), joint analytical work, data evaluation, and preparation of joint publications. The objectives of the CRP included the improvement of capabilities for water resources and environmental management of coastal zones; application of recently developed nuclear and isotopic techniques suitable for quantitative estimation of various components of SGD; understanding of the influence of SGD on coastal processes and on groundwater

  16. MANAGEMENT BOARD MEETING OF 26 JUNE 2001

    CERN Multimedia

    2001-01-01

    Report on the Outcome of the June Meetings of the Scientific Policy Committee, Finance Committee and Committee of Council and the June Council Session. The Director-General reported on a selection of highlights from the latest meetings of the Council and its committees in the week beginning 11th June. On the recommendation of the Finance Committee and Committee of Council, the Council had approved the Management's proposal to correct the discrepancy identified in the net salary adjustment implemented on 1st January 2001 by retroactively increasing the scale of basic salaries and stipends to achieve the 2.8% average net salary adjustment approved in December 2000 in the framework of the five-yearly review. The Council had also taken note of a report by the Working Group on the Enlargement of CERN's Membership, set up by the Committee of Council in March 2000 to study the conditions and consequences of the future accession of new Member States to the Organization, and had approved its recommendations for new co...

  17. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  18. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  19. Annual Site Environmental Report: 2005

    Energy Technology Data Exchange (ETDEWEB)

    sabba, d

    2007-02-03

    This report provides information about environmental programs during 2005 at the Stanford Linear Accelerator Center (SLAC). Seasonal activities that span calendar years are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC effectively applied environmental management in meeting the site's integrated safety and environmental management system (ISEMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2005, SLAC focused on these activities through the SLAC management systems (described in Chapter 3). These systems were also the way SLAC approached implementing ''greening of the government'' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. There were no reportable releases to the environment from SLAC operations during 2005. In addition, many improvements were continued during 2005, in waste minimization, recycling, stormwater drain system, groundwater restoration, and implementing a chemical management system (CMS) to better manage chemical use. Program-specific details are discussed.

  20. 40 CFR 60.3010 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  1. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  2. The European Regulation no. 761/2001 EMAS

    International Nuclear Information System (INIS)

    Andriola, L.; Battellini, S.

    2005-08-01

    The Regulation 761/2001 EMAS (Environmental Management and Audit Scheme), introduced by the 1836/93 Community regulation, is one of the tools activated by the European Union in order to apply the 5. and 6. Community Environmental Programme, in the field of firm-environment interactions at first (overcoming the old Command and Control logic), then by extending its applicability to ali Organisations. EMAS is a voluntary tool that enables Organisations to evaluate their own interaction with the Environment, to plan and check the yearly improvement of their environmental performance, providing the public documented relevant information. The report illustrates the procedure far applying this regulation, its implementation and new application trends in Italy and the advantages far firms [it

  3. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  4. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  5. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  6. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  7. Witnessing versus Fiction: Julia Frey’s diary of September 11, 2001 and Last Fall (2005 by Ronald Sukenick, her husband

    Directory of Open Access Journals (Sweden)

    Julia FREY

    2011-09-01

    Full Text Available Cette présentation compare de brefs extraits de trois textes par deux écrivains vivant ensemble à côté des tours jumelles du World Trade Center le 11 septembre 2001. Lorsqu’on compare les notes manuscrites retrouvées dans les affaires de Sukenick après la mort de l’auteur et son roman posthume Last Fall (2005, on voit que les phrases très courtes sont devenues des passages beaucoup plus élaborés, mais on constate aussi que l’événement lui-même n’a pas été fictionnalisé dans le roman. Même si le journal de Frey, écrit face aux ruines à l'aube du 12/09/2001, ne semble pas se préoccuper de style et s'il est beaucoup plus détaillé, il offre essentiellement le même récit que celui du roman de Sukenick. Frey a depuis terminé son propre roman qui comprend le récit tiré de son journal, à quelques modifications mineures près, concernant les événements pendant et après les attaques contre le World Trade Center. Le texte en est disponible en ligne http://juliafrey.blogspot.com/ >Balcony View - a 9/11 Diary En examinant ainsi l'ur texte pour le roman de chaque auteur, il apparaît que Sukenick et Frey choisissent de NE PAS fictionnaliser les événements du 11 septembre, suffisamment spectaculaires en eux-mêmes pour ne pas nécessiter d’habillage. Les deux auteurs se servent de leur expérience de ces événements de la même manière, les déplacant vers une structure fictionnelle, l'expérience devenant celle d'un personnage de fiction et ayant un impact sur l'intrigue du roman. Dans chacun des deux romans, l'impact physique et émotionnel du 11 septembre devient un tournant, un événement cataclysmique et totalement inattendu qui interrompt le cours de la vie quotidienne et modifie les relations entre les personnages. Les attaques ont joué le même rôle dans la vie des écrivains.This presentation compares brief excerpts of three texts, by two authors, living together at Ground Zero on 9/11/2001. Comparison

  8. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  9. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  10. Comet C/2001 J1

    Czech Academy of Sciences Publication Activity Database

    Pravec, Petr; Helin, E.; Lawrence, K.; Kotková, Lenka; Tichá, J.; Tichý, M.

    č. 7623 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  11. Chatham-Kent Hydro 2005 conservation and demand management plan : turn it off, turn it down, trade it in

    International Nuclear Information System (INIS)

    2005-01-01

    An outline of Chatham-Kent Hydro's conservation and demand management (CDM) plan was presented. The goal of the plan was to reduce energy consumption while assisting customers to achieve higher levels of energy efficiency. The plan was designed to support and expand on Chatham-Hydro's efforts in public education and interval metering, and also introduced other CDM programs such as smart metering; real time monitoring and load control; line loss improvements; power factor correction; and load displacement. The energy efficiency programs will use educational and financial incentives to help consumers save money. Educational programs were designed to explain the benefits of energy efficiency to consumers and service providers. All the programs are intended to provide consumers with the information necessary to pursue efficiency measures as well as to train service providers to increase their ability to provide efficient services. Various financial incentives will also be used to make the purchase of efficient technologies more economically feasible. It was noted that CDM programs will be monitored and evaluated based on costs, priorities and calculated annual financial savings before implementation. A budget summary was also included. Issues concerning commercial and industrial energy efficiency were examined, and details of low and fixed income customer programs were outlined. Strategies for municipal street lighting, heating, ventilation and air conditioning (HVAC) systems and new construction were presented. 1 tab., 1 fig

  12. Process Control Plan for 242-A Evaporator Campaign January 2001

    International Nuclear Information System (INIS)

    LE, E.Q.

    2001-01-01

    Wastewater stored in 104-AW that was generated during the terminal cleanout of the PUREX facility is the primary feed to be processed during the 242-A Evaporator Campaign 01-01, Approximately 801,600 gallons of 104-AW waste was transferred to feed tank 102-AW at the end of January 2001, in preparation for the campaign. The total feed volume that will be processed during Campaign 01-01 is 8 15,200 gallons, which includes the waste from 104-AW and residual waste from the previous evaporator campaign, 00-01, Additional feed will be generated during the pre-campaign cold run and processed during campaign 01-01. Based on characterization data from 104-AW feed waste 'and the evaluation of waste processability presented in Section 5 of this PCP, Campaign 01-01 does not pose any unacceptable risks to the facility, safety, environmental, human health offsite, or onsite personnel. Evaporator Campaign 01-01 is essential in supporting the River Protection Project (RPP) to maintaining its critical mission schedule and regulator commitments for tank waste systems. Several of RPP critical activities requiring completion of Campaign 01-01 by April 1, 2001 are highlighted below. Availability of DST space: Additional tank space that will be made available by this campaign is needed to support the continued interim stabilization of Single-Shell Tanks (SSTs). This additional space will also be used to move waste among Double-Shell Tanks (DSTs) to support the demonstrations of SST waste retrieval. DST life extension: An electrical outage in the AW Tank Farm is scheduled to begin following completion of the Campaign 01-01. This outage is a critical step in identifying and completing life extension upgrades to the DST systems. DST upgrades: Project W-314 plans significant upgrades to the AW Tank Farm to retrieve and supply waste feed to the Waste Treatment (Vitrification) Plant using a system that complies with current environmental requirements. These upgrades will commence on

  13. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and ... environmental management plan of the eastern coasts of Mazandaran Province. ..... REFERENCE ... Department of oceanography, texas A&M university. An online textbook.

  14. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  15. Hospital cost and quality performance in relation to market forces: an examination of U.S. community hospitals in the "post-managed care era".

    Science.gov (United States)

    Jiang, H Joanna; Friedman, Bernard; Jiang, Shenyi

    2013-03-01

    Managed care substantially transformed the U.S. healthcare sector in the last two decades of the twentieth century, injecting price competition among hospitals for the first time in history. However, total HMO enrollment has declined since 2000. This study addresses whether managed care and hospital competition continued to show positive effects on hospital cost and quality performance in the "post-managed care era." Using data for 1,521 urban hospitals drawn from the Healthcare Cost and Utilization Project, we examined hospital cost per stay and mortality rate in relation to HMO penetration and hospital competition between 2001 and 2005, controlling for patient, hospital, and other market characteristics. Regression analyses were employed to examine both cross-sectional and longitudinal variation in hospital performance. We found that in markets with high HMO penetration, increase in hospital competition over time was associated with decrease in mortality but no change in cost. In markets without high HMO penetration, increase in hospital competition was associated with increase in cost but no change in mortality. Overall, hospitals in high HMO penetration markets consistently showed lower average costs, and hospitals in markets with high hospital competition consistently showed lower mortality rates. Hospitals in markets with high HMO penetration also showed lower mortality rates in 2005 with no such difference found in 2001. Our findings suggest that while managed care may have lost its strength in slowing hospital cost growth, differences in average hospital cost associated with different levels of HMO penetration across markets still persist. Furthermore, these health plans appear to put quality of care on a higher priority than before.

  16. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  17. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  18. National Aeronautics and Space Administration Fiscal Year 2001 Accountability Report

    Science.gov (United States)

    2002-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events. The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this report.

  19. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  20. Science and Technology Policy Review 2005-2009 (Panama ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Outputs. Studies. Revisión del plan estratégico nacional de ciencia y tecnología de Panamá (2005-2009) y propuestas para el quinquenio 2010-2015 : informe. 48041. Reports. Revisión del plan estratégico nacional de ciencia y tecnología de Panamá (2005-2009) y propuestas para el quinquenio 2010-2015 : informe.

  1. 2001 activity report

    International Nuclear Information System (INIS)

    2002-01-01

    Managing radioactive waste for a better control in the future. The Quadrennial State/Andra contract, the double ISO 9001 (quality) and ISO 140001 (environment) certification and three diversified missions: industry, research and information. Those are the highlights of the activity report where the reader will be able to learn more about the Agency's major achievements in 2001. An appendix contains the management report of the Agency

  2. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  3. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  4. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  5. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  6. Environmental report 2001 - Verbund Austria Power Grid

    International Nuclear Information System (INIS)

    2002-01-01

    A balance of the environmental activities performed by Verbund Austria Power Grid during 2001 is presented. It comprises which measures were taken to reach their environmental objectives: certification of an environmental management system according to ISO 14001 and EMAS, environmental protection, policies, water and thermoelectric power generation status ( CO 2 , SO 2 , NO x emission monitoring, energy efficiency, replacement of old equipment), reduction of the greenhouse gases emissions and nature conservation. The report is divided in 8 sections: power grid, environmental policy, environmental management, power grid layout, environmental status of the system, introduction of new technologies for environmental monitoring, environmental objectives 2001 - 2002, and data and facts 2001. (nevyjel)

  7. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  8. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  9. Biont, a.s., Annual Report 2005

    International Nuclear Information System (INIS)

    Anon

    2006-01-01

    A brief account of activities carried out by the Biont, a.s. in 2005 is presented. These activities are reported under the headings: (1) Address of the Chairman of the Board; (2) Board of Directors; (3) Supervisory Board; (4) Report of the Board of Directors on the results of business activities 2005; (5) Business plan 2006; (6) Financial Statement Data 2005; (7) Loss compensation; (8) Report of Supervisory Board; (9) Independent Auditor's Report; (10) Contacts

  10. IFLA - Oslo 2005

    Czech Academy of Sciences Publication Activity Database

    Burgetová, Jarmila

    2005-01-01

    Roč. 14, č. 3 (2005), s. 6-7 ISSN 1210-0927 Institutional research plan: CEZ:AV0Z70830501 Keywords : International Federation of Library Associations and Institutions (IFLA) * IFLA World Library and Information Congress - Oslo Subject RIV: AF - Documentation, Librarianship, Information Studies

  11. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  12. Un Lustro de Investigación Histórico-Contable en España (2001-2005

    Directory of Open Access Journals (Sweden)

    Esteban Hernández Esteve

    2005-06-01

    Full Text Available Durante los últimos años la investigación en historia de la contabilidad en España ha alcanzado un notable nivel de desarrollo. Este trabajo pretende ilustrar este hecho ofreciendo una relación los más completa posible de las investigaciones publicadas y presentadas en congresos, así como de las tesis doctorales presentadas en las correspondientes universidades en los años 2001 a 2005. Se ha diferenciado entre las obras escritas en español y en inglés al objeto de observar el grado de penetración de los investigadores españoles en el ámbito internacional. Asimismo se ha clasificado los trabajos en tres grupos, según hayan sido escritos por un solo autor, por dos autores o por más de dos. Esta clasificación es útil para establecer el nivel de colaboración y trabajo en equipo que se da entre los investigadores españoles. Por otra parte, de acuerdo con los temas abordados se han distribuido los trabajos en cuatro grupos principales: historia de la contabilidad del sector privado (comerciantes, industriales, bancos, terratenientes, instituciones privadas, etc., historia de la contabilidad del sector público (Estado, organismos oficiales, instituciones municipales y locales, ejército, empresas públicas, etc., historia de la contabilidad de instituciones eclesiásticas (Iglesia secular: catedrales, diócesis, parroquias hermandades, cofradías, etc., e Iglesia regular: monasterios, y un grupo residual de trabajos varios. Cada grupo se analiza de por sí con ayuda de datos cuantitativos. Acto seguido, se procede a clasificar los trabajos por las épocas tratadas, así como por la clase de fuentes utilizadas. Finalmente, se intenta identificar los focos de investigación existentes en España, con indicación de sus planteamientos, perspectivas y metodología, siempre que sean perceptibles. Palabras clave: investigación histórico-contable, España, siglo XXI, tendencias. In recent years accounting history research has reached in

  13. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  14. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  15. "Since I have my case manager, I am back to life" case management in Croatia.

    Science.gov (United States)

    Gruber, Ema N; Ivezić-Strkalj, Sladana; Agius, Mark; Martić-Biocina, Sanja

    2008-03-01

    The authors present a case report of a patient who was treated by a case manager, a member of a Croatian Community Mental Health (CMH) Team, following the recommendations of WHO 2004 as well as the IRIS guidelines and the Basic Standards for Management of Patients with Serious Mental Illness in the Community (Agius 2005) and using the elements of Clinical case management (Muser 1998), Assertive community treatment model (Burns 1995, Scott 1995, Wolfsan 1990), the personal strength model (Rapp 1988) and Rehabilitation model (Anthony 1993). In order to emphasize the importance of the therapist-patient relationship in the treatment of chronic schizophrenic patients (Ivezic 2001) and creating the group atmosphere a Croatian model of case management is created where the patient's needs and risks are assessed by a multidisciplinary team which also conducts the recommended psychosocial interventions plan. The majority of interventions are conducted in groups. The case manager develops a confident relationship with a patient, nourishes the positive transference and aids the delivery of the treatment. The main goals of the interventions are empowerment of the patient, improvement of his abilities and decreasing of disabilities. The case manager also carries out a full assessment of the needs of the patient's family so that the family or carers are also included in the treatment or support if necessary (Gruber 2006). A case report of a patient and the work of her case manager as well as the case manager's diary (Gruber 2007) and the Croatian model of case management is presented in this article.

  16. Role of GIS in Health Management Information System and Medical Plan: A Case Study of Gangtok area, Sikkim, India

    Directory of Open Access Journals (Sweden)

    Ashok Kumar Sharma

    2015-03-01

    Full Text Available Geographical Information System (GIS in a Health Management Information System (HMIS can be a powerful tool to make health care delivery more effective and far more efficient. It includes database management, planning, risk service area mapping, location identification, etc. One of the causes for this sudden surge of GIS use in healthcare application is the spatial dependency of health related factors. The use of GIS helps capture, store, combine, analyze and display data using Remote Sensing, topographical surveys, urban survey and town planning, geology, hydrology, traffic and transport engineering, land use pattern, rainfall pattern, and drainage. (Mathew, 2005. In the research work use of GIS software ILWIS for assessing the social network and health services available in Gangtok area, East Sikkim. Mapping of essential resources like road networks, locate the health facility in the study area and find out the population density using GIS techniques.

  17. Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

    International Nuclear Information System (INIS)

    CLARK, D.E.

    2000-01-01

    The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This

  18. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  19. NuTEC annual report. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    This report summarizes the educational activities and related management of the Nuclear Technology and Education Center (NuTEC) during the 2001 fiscal year. Both Tokyo and Tokai Education Centers have successfully conducted almost all the planned domestic and international training courses. In addition, Tokai Education Center has performed the 3rd nuclear supervisor training course and other courses for special nuclear emergency preparedness in response to the legal amendment after the JCO criticality accident. The sum total number of participants was 1,310. The International Technology Transfer Division has not only planned and organized the international training courses, but also taken charge of the 3rd workshop on Human Resource Development under the framework of FNCA (Forum of Nuclear Cooperation in Asia). Various researches have been made to improve the educational program. (author)

  20. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  1. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  2. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    Science.gov (United States)

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  3. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  4. Report: policy drivers and the planning and implementation of integrated waste management in Ireland using the regional approach.

    Science.gov (United States)

    Rudden, P J

    2007-06-01

    Waste management in Ireland has been dramatically transformed over the past 10 years from over 90% reliance on landfill towards a fully integrated approach. According to the latest EPA National Database Report in 2007 our municipal (household and commercial but excluding construction and demolition) recycling rate was 35% in 2005. This has been achieved through the implementation of 10 regional waste management plans all prepared within a new national planning framework in accordance with the Waste Management Act 1996 and Government policy document 'Changing Our Ways', published in 1998 by the Irish Department of the Environment, Heritage and Local Government. The principal drivers of the waste management plans and strategies are the EU Waste Framework Directive (recently revised), the EU Packaging Directive and the EU Landfill Directive. In addition, there were substantial political and environmental drivers due to the relatively poor standard of landfills in Ireland. Strict landfill regulation by the Environment Protection Agency commenced in 1997and led to many closures of poor facilities and new standards of siting design and operation. This has led to very high landfill charges that are only now beginning to stabilize. The key to improving public attitudes to the greatly improving waste management system has been the degree and content of stakeholder involvement programmes. These programmes are now consolidated into a national 'Race against Waste' programme (www.raceagainstwaste.ie). The purpose of the programme is to create awareness and deal with many of the misconceptions in the public mind attached to waste treatment methods especially incineration. Waste management is after all about people.

  5. 40 CFR 60.2620 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  6. Participative planning and information flow within management control

    Directory of Open Access Journals (Sweden)

    Tomasz Dyczkowski

    2016-09-01

    Full Text Available The paper examines the relationships between two different approaches to planning processes (participa- tive and non-participative and information flows within management control in companies. It augments the existing theoretical and empirical research by coupling management control and management infor- mation with participative planning, not only in operational but also in the strategic perspective. The re- sults presented in the paper stem from two consecutive studies, conducted between November 2010 and January 2012 and between November 2013 and January 2014. The studies comprised 397 and 179 Polish companies respectively. The authors formulated two hypotheses linking participative planning with upward and downward management information flows. The paper employed a quantitative approach, using the Spearman rank correlation analysis and hierarchical clustering using the Ward method, which enabled comparative analyses both in reference to various groups of companies included in particular research samples and over time. The results obtained showed the positive influence of participative plan- ning both on upward and downward information flows in enterprises. In particular, participative planning reduced information imbalances between top (the management and lower (employees of functional departments tiers in organisation structures.

  7. 75 FR 33239 - Rangeland Allotment Management Planning on the Fall River West and Oglala Geographic Areas, Fall...

    Science.gov (United States)

    2010-06-11

    ...The USDA, Forest Service, will prepare an environmental impact statement (EIS) analyzing the management of rangeland vegetation resources, which includes livestock grazing, on the National Forest System (NFS) lands within the Oglala Geographic Area (OGA) of the Oglala National Grassland on the Pine Ridge Ranger District and the West Geographic Area (WGA) of the Buffalo Gap National Grassland on the Fall River Ranger District of the Nebraska National Forest (Analysis Area) areas as mapped by the 2001 Nebraska National Forest Revised Land and Resource Management Plan (Forest Plan). A Notice of Intent (NOI) for this project was published February 22, 2008 (73 No. 36 FR 9760- 9762). More than six months have elapsed since the projected draft environmental impact statement (DEIS) date in that original NOI. This revised NOI is being issued to update the project schedule. There will be a record of decision (ROD) for each geographic area. Proposed management actions would be implemented beginning in the year 2012. The agency gives notice of the full environmental analysis and decision-making process that will occur on the proposal so interested and affected people may become aware of how they may participate in the process and contribute to the final decision.

  8. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    Science.gov (United States)

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  9. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  10. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  11. The Swedish Nuclear Power Inspectorate's Review Statement and Evaluation of the Swedish Nuclear Fuel and Waste Management Co's RD and D Programme 2001

    International Nuclear Information System (INIS)

    2002-09-01

    According to the Act on Nuclear Activities, the holder of a licence to operate a nuclear reactor must adopt all necessary measures to manage and dispose of spent nuclear fuel and nuclear waste. The Act stipulates requirements on a research programme which is to be submitted to the competent regulatory authority once every three years. The Swedish Nuclear Power Inspectorate (SKI) is the competent authority that evaluates and reviews the programme. SKI distributes the programme to a wide circle of reviewing bodies for comment, including authorities, municipalities, universities and NGOs. The Swedish programme for final disposal of spent nuclear fuel started about 25 years ago. According to the Swedish Nuclear Waste Management Co. (SKB), the planned repository will not be closed until sometime in the 2050's. A series of decisions must be made before this goal is attained. The decision process can therefore be described as a multi-stage process. During each stages, safety will be evaluated and there is a possibility of taking additional time for development work or of selecting improved solutions. SKI's task is to ensure safety compliance throughout all of these stages. In its decision in January 2000, the Government explained that the Programme for Research, Development and Demonstration for the Treatment and Final Disposal of Nuclear Waste (RD and D Programme 98) complied with legislative requirements but that certain supplementary reporting should be conducted by SKB and submitted no later than when the next programme, in accordance with paragraph 12 of the Act on Nuclear Activities, was prepared (September 2001). The supplementary reporting requested by the Government, and which was submitted by SKB to SKI in December 2000, dealt with issues relating to method selection, site selection and the site investigation programme. SKI submitted its review of the supplement to the Government in June 2001 and the Government made a decision on the matter on November 1, 2001

  12. NSLS 2005 ACTIVITY REPORT (NATIONAL SYNCHROTRON LIGHT SOURCE ACTIVITY REPORT 2005)

    International Nuclear Information System (INIS)

    MILLER, L.

    2006-01-01

    efforts on NSLS-II, the world-leading third-generation synchrotron planned for construction at BNL. NSLS-II passed a critical milestone in 2005 with the approval by the Department of Energy of CD-0. BNL has established the NSLS-II Project Organization within the Light Sources Directorate to put in place the management systems and infrastructure necessary to execute this complex undertaking. I will serve as NSLS-II Project Director and also retain my position as Associate Laboratory Director for Light Sources, with the NSLS reporting to me. Another exciting development is the planned establishment of the Joint Photon Sciences Institute (JPSI). JPSI will be devoted to cultivating and fostering collaborative, interdisciplinary R and D in areas of the physical sciences, engineering, and the life sciences that are united in employing synchrotron-based methods. JPSI will also develop new methods and applications that exploit the unique capabilities of NSLS-II and will serve as a gateway for NSLS-II users. JPSI will be a partnership between the Department of Energy and New York State, and I am delighted that New York State Governor George Pataki has pledged $30 million for the construction of the JPSI building. The building will be located adjacent to NSLS-II and will contain offices, meeting rooms, and specialized laboratories. The operating expenses of JPSI and funding for its research programs will be provided by the federal government. Until a permanent NSLS Director is selected, NSLS User Science Division Associate Chair Chi-Chang Kao will serve as the Interim NSLS Director. I couldn't be leaving the facility in more capable hands. Chi-Chang will lead NSLS staff and users this year in the development of a five-year strategic plan for the NSLS, scheduled for completion by the end of summer 2006. The plan will outline the course for the future operation and development of the NSLS, and will help ensure that the future of the NSLS remains as bright as its past

  13. Evaluating the impact of a disease management program for chronic complex conditions at two large northeast health plans using a control group methodology.

    Science.gov (United States)

    Schwerner, Henry; Mellody, Timothy; Goldstein, Allan B; Wansink, Daryl; Sullivan, Virginia; Yelenik, Stephan N; Charlton, Warwick; Lloyd, Kelley; Courtemanche, Ted

    2006-02-01

    The objective of this study was to observe trends in payer expenditures for plan members with one of 14 chronic, complex conditions comparing one group with a disease management program specific to their condition (the intervention group) and the other with no specific disease management program (the control group) for these conditions. The authors used payer claims and membership data to identify members eligible for the program in a 12-month baseline year (October 2001 to September 2002) and a subsequent 12-month program year (October 2002 to September 2003). Two payers were analyzed: one health plan with members primarily in New Jersey (AmeriHealth New Jersey [AHNJ]), where the disease management program was offered, and one affiliated large plan with members primarily in the metro Philadelphia area, where the program was not offered. The claims payment policy for both plans is identical. Intervention and control groups were analyzed for equivalence. The analysis was conducted in both groups over identical time periods. The intervention group showed statistically significant (p control group. Intervention group members showed a reduction in expenditures of -8%, while control group members showed an increase of +10% over identical time periods. Subsequent analyses controlling for outliers and product lines served to confirm the overall results. The disease management program is likely responsible for the observed difference between the intervention and control group results. A well-designed, targeted disease management program offered by a motivated, supportive health plan can play an important role in cost improvement strategies for members with complex, chronic conditions.

  14. Training hospital managers for strategic planning and management: a prospective study.

    Science.gov (United States)

    Terzic-Supic, Zorica; Bjegovic-Mikanovic, Vesna; Vukovic, Dejana; Santric-Milicevic, Milena; Marinkovic, Jelena; Vasic, Vladimir; Laaser, Ulrich

    2015-02-26

    Training is the systematic acquisition of skills, rules, concepts, or attitudes and is one of the most important components in any organization's strategy. There is increasing demand for formal and informal training programs especially for physicians in leadership positions. This study determined the learning outcomes after a specific training program for hospital management teams. The study was conducted during 2006 and 2007 at the Centre School of Public Health and Management, Faculty of Medicine, University of Belgrade and included 107 participants involved in the management in 20 Serbian general hospitals. The management teams were multidisciplinary, consisting of five members on average: the director of the general hospital, the deputy directors, the head nurse, and the chiefs of support services. The managers attended a training program, which comprised four modules addressing specific topics. Three reviewers independently evaluated the level of management skills at the beginning and 12 months after the training program. Principal component analysis and subsequent stepwise multiple linear regression analysis were performed to determine predictors of learning outcomes. The quality of the SWOT (strengths, weaknesses, opportunities and threats) analyses performed by the trainees improved with differences between 0.35 and 0.49 on a Likert scale (p strategic planning. Following the training program, the external environment, strategic positioning, and quality of care were predictors of learning outcomes. The four regression models used showed that the training program had positive effects (p Strategic Plan comprising the hospital mission, vision, strategic objectives, and action plan. This study provided evidence that training for strategic planning and management enhanced the strategic decision-making of hospital management teams, which is a requirement for hospitals in an increasingly competitive, complex and challenging context. For the first time, half of

  15. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    its so-called “comprehensive-integrated” tradition and both the steering and strategic roles of national-level planning have been largely superseded by a more “flexible” planning style fit to promote specific sectoral agendas. While the legacy of land-use planning is still embedded at the local level...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  16. Healthcare waste management research: A structured analysis and review (2005-2014).

    Science.gov (United States)

    Thakur, Vikas; Ramesh, A

    2015-10-01

    The importance of healthcare waste management in preserving the environment and protecting the public cannot be denied. Past research has dealt with various issues in healthcare waste management and disposal, which spreads over various journals, pipeline research disciplines and research communities. Hence, this article analyses this scattered knowledge in a systematic manner, considering the period between January 2005 and July 2014. The purpose of this study is to: (i) identify the trends in healthcare waste management literature regarding journals published; (ii) main topics of research in healthcare waste management; (iii) methodologies used in healthcare waste management research; (iv) areas most frequently researched by researchers; and (v) determine the scope of future research in healthcare waste management. To this end, the authors conducted a systematic review of 176 articles on healthcare waste management taken from the following eight esteemed journals: International Journal of Environmental Health Research, International Journal of Healthcare Quality Assurance, Journal of Environmental Management, Journal of Hazardous Material, Journal of Material Cycles and Waste Management, Resources, Conservations and Recycling, Waste Management, and Waste Management & Research. The authors have applied both quantitative and qualitative approaches for analysis, and results will be useful in the following ways: (i) results will show importance of healthcare waste management in healthcare operations; (ii) findings will give a comparative view of the various publications; (c) study will shed light on future research areas. © The Author(s) 2015.

  17. RTE activity report 2005; RTE rapport d'activite 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The RTE (electric power transport network) is the french manger of the electric power transport. This activity report provides information on the company results for the year 2005: panorama of the year, management and organization, the place of RTE in the european market, the customers, the industrial tool, the environment the human resources, the international activity and the management report. (A.L.B.)

  18. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  19. The plan contract between CEA and the French state for 2001-2004

    International Nuclear Information System (INIS)

    Pijaudier-Cabot, F.

    2001-01-01

    The French energy commission (CEA) has defined 3 axis of development in the framework of a 4 year contract with the government. The first axis is to propose technological solutions for improving competitiveness of nuclear energy, for managing nuclear wastes and for assuring safety at any step of the nuclear industry. The second axis concerns promoting new technologies in the fields of energy, of information and of bio-engineering. CEA will develop studies about the use of hydrogen as an alternative energy for transport. The third axis deals more particularly with fundamental research in the fields of energy, of environment, of bio-technologies and of health (research about the prion for instance). The subsidy given by the state has been increased by 3.4% for 2001. (A.C.)

  20. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  1. Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    Dan Kayser

    2005-01-01

    This report summarizes the environmental status of Ames Laboratory for calendar year 2005. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2005, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled accordingly to all applicable EPA, State, Local and DOE Orders. The most recent RCRA inspection was conducted by EPA Region VII in January 1999. The Laboratory received a notice of violation (NOV) which included five citations. There have been no inspections since then. The citations were minor and were corrected by the Laboratory within the time allocated by the EPA. See correspondence in Appendix D. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2005. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2005. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. Pollution awareness, waste minimization and recycling programs were implemented in 1990 and updated in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, CRTs, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-CH, through the Laboratory's Self Assessment Report, on its Affirmative

  2. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  3. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  4. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  5. The flood risk management plan: towards spatial water governance

    NARCIS (Netherlands)

    Hartmann, T.; Driessen, P.

    2017-01-01

    The flood risk management plan challenges both water engineers and spatial planners. It calls for a new mode of governance for flood risk management. This contribution analyses how this mode of governance distinguishes from prevalent approaches. Spatial planning and water management in Europe are

  6. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  7. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...

  8. Comet C/2001 A1 (Linear)

    Czech Academy of Sciences Publication Activity Database

    Blythe, M.; Dawson, M.; Kornos, L.; Koleny, P.; Kotková, Lenka; Tichá, J.; Tichý, M.

    č. 7561 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  9. Comet C/2001 Q1 (Neat)

    Czech Academy of Sciences Publication Activity Database

    Lawrence, K. J.; Helin, E. F.; Pravdo, S. H.; Pravec, Petr; Kušnirák, Peter; Kočer, M.; Spahr, T. B.

    č. 7685 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  10. Comet P/2001 T3 (Neat)

    Czech Academy of Sciences Publication Activity Database

    Lawrence, K. J.; Pravdo, S. H.; Helin, E. F.; Pravec, Petr; Kušnirák, Peter; Tichá, J.; Tichý, M.; Jelínek, P.

    č. 7733 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  11. Comet P/2001 MD 7 (Linear)

    Czech Academy of Sciences Publication Activity Database

    Blythe, M.; Kotková, Lenka; Marsden, B. G.

    č. 7660 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  12. Comet C/2001 A2 (Linear)

    Czech Academy of Sciences Publication Activity Database

    Pravec, Petr; Kotková, Lenka; Tichý, M.; Kočer, M.

    č. 7564 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  13. Comet C/2001 Q6 (Neat)

    Czech Academy of Sciences Publication Activity Database

    Pravdo, S. H.; Helin, E. F.; Lawrence, K. J.; Tichý, M.; Kotková, Lenka; Wolf, M.; Balam, D.; Shelus, P. J.

    č. 7698 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  14. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  15. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  16. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  17. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  18. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  19. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Science.gov (United States)

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  20. Water Science and Technology Board Annual Report 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-10-01

    This annual report marks the twentieth anniversary of the Water Science and Technology Board (WSTB) (1982-2002). The WSTB oversees studies of water issues. The principal products of studies are written reports. These reports cover a wide range of water resources issues of national concern. The following three recently issued reports illustrate the scope of the WSTB's studies: Envisioning the Agenda for Water Resources Research in the Twenty-first Century. The Missouri River Ecosystem: Exploring the Prospects for Recovery, and Assessing the TMDL Approach to Water Quality Management. The WSTB generally meets three times each year where discussions are held on ongoing projects, strategic planning, and developing new initiatives. The meetings also foster communication within the water resources community. The annual report includes a discussion on current studies, completed studies 2001-2002, and future plans, as well as a listing of published reports (1983-2002).

  1. Environmental Management Performance Report to DOE-RL December 2001

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of October 31, 2001 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  2. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  3. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  4. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained

  5. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  6. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... management plan shall identify both the feasibility and the approach to separate certain components of solid... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section 60.55c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  7. Information Management for Factory Planning and Design

    OpenAIRE

    Chen, Danfang

    2012-01-01

    This thesis is dedicated to the manufacturing industry for the improvement of information management within the factory planningand design domain, and for more efficient factory planning and design. Currently the manufacturing industry lacks sufficient methods for capturing, structuring, and representing information and knowledge for easy access, exchange, integration and reuse within the domain. Therefore the focus of this thesis is on information and knowledge management within factory plan...

  8. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  9. Annual report and balance 2001; Memoria y balance 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2001 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  10. The evolving role and care management approaches of safety-net medicaid managed care plans

    OpenAIRE

    Gusmano, Michael K.; Sparer, Michael S.; Brown, Lawrence D.; Rowe, Catherine; Gray, Bradford

    2002-01-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods we studied these “safety-net” health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also f...

  11. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  12. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  13. Management and Planning for Small Community Wastewater

    Science.gov (United States)

    Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management Agencies, The Office of Wastewater Management at EPA, in cooperation with the Global Environment and

  14. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  15. Air quality management: challenges and solutions in delivering air quality action plans

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, C.I.; Longhurst, J.W.S.; Woodfield, N.K.

    2000-07-01

    The Air Quality Strategy for England, Scotland, Wales and Northern Ireland (DETR, 2001) has the aim of showing how improved local air quality in the UK may be delivered. Through a process of reviewing and assessing local air quality in both urban and rural localities, a clear picture is emerging of areas of the UK where air quality objectives are not likely to be met. The next challenge will be the identification of the required actions and new ways of working to achieve specific air quality objectives. The declaration of air quality management areas, where objectives are not predicted to be met by their target years, involves co-ordinated local action and collaborative working, which can only be effective with support across local authority departments and external stake holders. This paper provides a background to the relevant legislation underpinning, local air quality management and summarises the review and assessment process. It then comments on future directions in relation to the designation of Air Quality Management Areas and considers the requirements of action plans to deliver the goal of cleaner air in the UK. It is concluded that the UK has developed a highly sophisticated system of air quality management over a relatively short period of time, and with it has brought a new way of local authority working. The challenge of the next stage of the process is likely to be in implementing cost effective and proportional solutions to identified problems at the local level. (Author)

  16. Douglas Morrison 1930-2001

    CERN Multimedia

    2001-01-01

    It is with great sadness that we have learnt of the death of our colleague and friend Douglas Morrison on Sunday 25 February 2001. In accordance with the wishes of the family, the funeral will be strictly private. A memorial gathering is planned to be held at CERN at a later date. A full tribute will appear in the next issue.

  17. [Local planning: the speech of basic health care center manager].

    Science.gov (United States)

    Cubas, Márcia Regina

    2005-01-01

    As planning is understood as a management tool, this article offers an argument through the speech framework of Basic Health Care Center Managers in the city of Curitiba-PR, by means of the Collective Subject Speech Methodology on local planning aspects. Its purpose is to bring local managers to a reflection concerning their styles, practices and experiences, as well as to collaborate with central level leading teams towards building their planning processes in an upward, participatory, communicative and strategic way. Considerations of the speeches built from central ideas are presented: planning methodology; inter-sectoriality; territorial basis; team and community participation; training, autonomy and particular profile of local managers; the manager's agenda; and institutional culture.

  18. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  19. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  20. Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Chmielewska, D; Infeld, E; Zupranski, P [The Andrzej Soltan Institute for Nuclear Studies, Swierk-Otwock (Poland)

    2006-06-15

    The ''Annual Report 2005'' describes activities of Andrzej Soltan Institute for Nuclear Studies in 2005. Report consists in general two parts. First consists of general information about location, management, scientific council, personnel financial support and conferences while the second one the scientific activity of Institute. This part is divided into subsections which present progress in research of the Institut Departments and Establishments. A Foreword to report written by Director of the Institute prof. Ziemowit Sujkowski is also given.

  1. Annual Report 2005

    International Nuclear Information System (INIS)

    Chmielewska, D.; Infeld, E.; Zupranski, P.

    2006-06-01

    The ''Annual Report 2005'' describes activities of Andrzej Soltan Institute for Nuclear Studies in 2005. Report consists in general two parts. First consists of general information about location, management, scientific council, personnel financial support and conferences while the second one the scientific activity of Institute. This part is divided into subsections which present progress in research of the Institut Departments and Establishments. A Foreword to report written by Director of the Institute prof. Ziemowit Sujkowski is also given

  2. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  3. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  4. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  5. RTE activity report 2005; RTE rapport d'activite 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The RTE (electric power transport network) is the french manger of the electric power transport. This activity report provides information on the company results for the year 2005: panorama of the year, management and organization, the place of RTE in the european market, the customers, the industrial tool, the environment the human resources, the international activity and the management report. (A.L.B.)

  6. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. 14 refs., 13 figs., 9 tabs

  7. Data Management and Preservation Planning for Big Science

    Directory of Open Access Journals (Sweden)

    Juan Bicarregui

    2013-06-01

    Full Text Available ‘Big Science’ - that is, science which involves large collaborations with dedicated facilities, and involving large data volumes and multinational investments – is often seen as different when it comes to data management and preservation planning. Big Science handles its data differently from other disciplines and has data management problems that are qualitatively different from other disciplines. In part, these differences arise from the quantities of data involved, but possibly more importantly from the cultural, organisational and technical distinctiveness of these academic cultures. Consequently, the data management systems are typically and rationally bespoke, but this means that the planning for data management and preservation (DMP must also be bespoke.These differences are such that ‘just read and implement the OAIS specification’ is reasonable Data Management and Preservation (DMP advice, but this bald prescription can and should be usefully supported by a methodological ‘toolkit’, including overviews, case-studies and costing models to provide guidance on developing best practice in DMP policy and infrastructure for these projects, as well as considering OAIS validation, audit and cost modelling.In this paper, we build on previous work with the LIGO collaboration to consider the role of DMP planning within these big science scenarios, and discuss how to apply current best practice. We discuss the result of the MaRDI-Gross project (Managing Research Data Infrastructures – Big Science, which has been developing a toolkit to provide guidelines on the application of best practice in DMP planning within big science projects. This is targeted primarily at projects’ engineering managers, but intending also to help funders collaborate on DMP plans which satisfy the requirements imposed on them.

  8. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... principles of sustained yield management and will not be authorized until practical methods of harvest based on sound economic and silvicultural and other forest management principles have been prescribed... period in the future. Forest management plans shall be based on the principle of sustained yield...

  9. Injuries in youth football: national emergency department visits during 2001-2005 for young and adolescent players.

    Science.gov (United States)

    Mello, Michael J; Myers, Richard; Christian, Jennifer B; Palmisciano, Lynne; Linakis, James G

    2009-03-01

    Limited research exists describing youth football injuries, and many of these are confined to specific regions or communities. The authors describe U.S. pediatric football injury patterns receiving emergency department (ED) evaluation and compare injury patterns between the younger and older youth football participants. A retrospective analysis of ED data on football injuries was performed using the National Electronic Injury Surveillance System-All Injury Program. Injury risk estimates were calculated over a 5-year period (2001-2005) using participation data from the National Sporting Goods Association. Injury types are described for young (7-11 years) and adolescent (12-17 years) male football participants. There were an estimated total of 1,060,823 visits to U.S. EDs for males with football-related injuries. The most common diagnoses in the younger group (7-11 years) were fracture/dislocation (29%), sprain/strain (27%), and contusion (27%). In the older group (ages 12-17 years), diagnoses included sprain/strain (31%), fracture/dislocation (29%), and contusion (23%). Older participants had a significantly higher injury risk of injury over the 5-year study period: 11.0 (95% confidence interval [CI] = 9.2 to 12.8) versus 6.1 (95% CI = 4.8 to 7.3) per 1,000 participants/year. Older participants had a higher injury risk across all categories, with the greatest disparity being with traumatic brain injury (TBI), 0.8 (95% CI = 0.6 to 1.0) versus 0.3 (95% CI = 0.2 to 0.4) per 1,000 participants/year. National youth football injury patterns are similar to those previously reported in community and cohort studies. Older participants have a significantly higher injury risk, especially with TBI.

  10. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  11. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  12. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    Department of Fish and Wildlife (WDFW). The functions of the parties are described in an MOU between the YN and the WDFW. A Scientific and Technical Advisory Committee (STAC) consisting of one representative from each management entity reports to the Policy Group and provides technical input on policy and other issues. Additional committee's, such as the Monitoring Implementation and Planning Team (MIPT), serve as the discretion of STAC. The Policy Group and STAC meet periodically (usually monthly) to conduct the business of the YKFP. Although the YKFP is an all stocks initiative (BPA 1996), most effort to date has been directed at spring chinook salmon and coho salmon. This report is a compilation of the year's activities between August 1, 2001 and July 31, 2002. All findings should be considered preliminary until data collection is completed or the information is published in a peer-reviewed journal.

  13. FY 2005 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Supplement to the President`s FY 2005 Budget reports on the FY 2004 research and development R and D activities and FY 2005 plans of the multiagency Networking...

  14. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  15. Study on Flood Management Plan in Surabaya City

    Directory of Open Access Journals (Sweden)

    Anton Dharma Pusaka Mas

    2015-05-01

    Full Text Available The area alongside the Gunung Sari Channel has an important meaning to the development of Surabaya City. The rising development in this area which causes the increase of flood events induces negative impacts on the growth of Surabaya City. The flood management plan in Gunung Sari Channel has been conducted by Brantas Project since 1988. This planning was reviewed in 1993 and 1999. This research was conducted to analyze the performance of flood management plan by Brantas Project. It was constructively done by HEC-FDA Software which can develop risk analysis by including economic consideration. Hydro-Economy approach integrated with the HEC-FDA analysis can yield the indicator of flood management plan performance in the form of total cost and risk cost (Expected Annual Damage/EAD. The best total cost yielded from the analysis was Rp. 893,692,230, while the risk cost was Rp. 384,238,410/year. It is expected that this research result can used for achieving best performance for floods management in Gunung Sari Channel.

  16. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  17. Activity report 2001; Rapport annuel d'activite 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The DED, Department of the Wastes Studies, part of the Direction of the Nuclear Energy of the CEA, regroups knowledge in the domain of the chemistry, the biochemistry, the process measures and simulation engineering applied to the radioactive wastes management. This annual report presents for the year 2001 the missions, the organization, the scientific collaborations, the research programs and the publications of the Department. (A.L.B.)

  18. Site management plan: Douglas Point Ecological Laboratory

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.

    1979-01-01

    A portion of the Douglas Point Site has been set aside for use as an ecological monitoring facility (DPEL). Plans call for it to provide for long-term scientific study and analysis of specific terrestrial and aquatic ecological systems representative of the coastal plain region of the mid-Atlantic United States. Discussion of the program is presented under the following section headings: goals and objectives; management and organization of DPEL; laboratory director; site manager; monitoring manager; research manager; and, organizational chart. The seven appendixes are entitled: detailed site description; supplemental land use plan; contract between Potomac Electric Power Company and Charles County Community Collge (CCCC); research and monitoring projects initiated at the Douglas Point Power Plant site; advisory committees; facilities and equipment; and CCCC personnel resumes

  19. New chemical entities and their market penetration in Finland during the years 1996 through 2005.

    Science.gov (United States)

    Martikainen, Jaana E; Enlund, Hannes

    2009-03-01

    There is little empirical information about the role of new chemical entities (NCEs) and to what extent they are being adopted in modern health care. We aimed to investigate which NCEs were launched in Finland during the years 1996 through 2005 and how they penetrated the market in Finland. NCEs were identified from Finnish drug compendiums and verified from marketing authorization and drug wholesale databases. Market penetration was determined by extracting data about outpatient drug costs and consumption in the year 2005 from drug wholesale databases. Of the 294 NCEs introduced in 1996 through 2005, 55% were authorized nationally and 45% by the European Commission. Two hundred two NCEs (69%) had pharmacy sales in 2005. Most NCEs were for cancer (19), infections (18), cardiovascular diseases (17), and pain and arthritis (14). NCEs introduced from 1996 through 2005 comprised 38% of total outpatient prescription drug costs and 19% of the total volume of NCEs used by outpatients in 2005. The corresponding figures for the NCEs introduced in 2001 through 2005 were 11% and 4%. All drugs for dementia and multiple sclerosis, all biological drugs for rheumatoid arthritis, and most drugs for erectile dysfunction and osteoporosis were introduced during the study period. The cost of NCEs also accounted for >50% of costs for drugs to treat hyperlipidemia, peptic ulcer, psychosis, and diabetes mellitus. The use of NCEs was greater when measured in monetary value than in volume. The overall costs of NCEs introduced from 1996 through 2005 were high in several major drug classes, although their share of overall use was modest when measured in volume. The market penetration of drugs introduced during 2001 through 2005 was still rather low in 2005.

  20. Scenario Planning Implementation : A Case of a Malaysian Organisation

    OpenAIRE

    Lim, Lee Chin

    2007-01-01

    In this dynamic and ever changing era, uncertainties are inevitable. A successful organisation is one that is able to address the uncertainties in a world that is complex and unpredictable. Scenario planning is a strategic management tool that offers an alternative approach to planning in a world where linear logic does not prevail (Geons, 2001). It is a method for learning about the future by understanding the uncertainties and driving forces affecting an organisation’s future. Its core bene...

  1. Do Groundwater Management Plans Work? A statistical evaluation of the effectiveness of groundwater management plans towards achieving water supply and environmental objectives under a changing climate.

    Science.gov (United States)

    White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.

    2017-12-01

    Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed

  2. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  3. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  4. Liquidity management through financial planning

    OpenAIRE

    Kameníková Katarína

    2001-01-01

    One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial pl...

  5. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  6. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The Office of Financial Management, Planning and Evaluation is responsible for developing the Commission's...

  7. Annual report of Nuclear Science Research Institute, JFY2005

    International Nuclear Information System (INIS)

    2007-04-01

    Japan Atomic Energy Agency (JAEA) was inaugurated on October 1st, 2005. Works for the operation and maintenance of various research facilities as well as safety management, radiation protection, and radioactive wastes management, which have been undertaken by departments in Tokai Research Establishment of Japan Atomic Energy Research Institute (JAERI), were inherited by newly established departments of Nuclear Science Research Institute (NSRI). The NSRI is composed of Planning and Coordination Office and seven departments such as Department of Operational Safety Administration, Department of Radiation Protection, Department of Research Reactor and Tandem Accelerator, Department of Hot Laboratories and Facilities, Department of Criticality and Fuel Cycle Research Facilities, Department of Decommissioning and Waste Management, and Engineering Services Department. This annual report of JFY 2005 summarizes the activities of NSRI and is expected to be referred to and utilized by R and D departments and project promotion sectors at NSRI site for the enhancement of their own research and management activities to attain their goals according to Middle-term Plan' successfully and effectively. In chapter 1, outline of organization and administrative activities of NSRI is described. In chapter 2, the following activities made by the departments in NSRI are summarized, i.e., (1) operation and maintenance of research reactors (JRR-3, JRR-4, NSRR), criticality assemblies (STACY, TRACY, FCA, TCA), hot laboratories, (BECKY, Reactor Fuel Examination Facility, WASTEF, Research Laboratory 4, Plutonium Research Laboratory 1, Tokai Hot Laboratory, etc), and large-scale facilities (Tandem accelerator, LSTF, THYNC, TPTF, etc), and (2) safety management, radiation protection, management of radioactive wastes, decommissioning of nuclear facilities, engineering services, utilities and maintenance, etc, all of which are indispensable for the stable and safe operation and utilization of the

  8. The use and usefulness of inventory-based management planning to forest management

    DEFF Research Database (Denmark)

    Toft, Maja Nastasia Juul; Adeyeye, Yemi; Lund, Jens Friis

    2015-01-01

    -structured interviews, participatory rural appraisal exercises and analyses of aerial photographs. First, we find that the operational plans supposed to guide community-level management are based on sub-standard forest inventories, which limits their potential role in practical forest management. Second, we find...... of their forests in the sense that their impressions of past and current forest condition are mirrored in what we can observe from analysis of change in forest condition based on aerial photographs. Based on these results we question the usefulness of inventory-based management planning in the context of community...

  9. 2005: risks and opportunities for the renewable energies; 2005: risques et opportunites pour les energies renouvelables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-02-15

    This press conference takes stock on the renewable energies in the world at the date of the first of february 2005. A first part presents the renewable energies activities in the world, and then more specially in France, the 2001 directive on the development of the electric power from renewable sources, the controversy around the public service charges due to the renewable energies and the fiscal advantages proposed. The second part details each renewable energies sources situation, cost, capacity: photovoltaic, wind energy, hydroelectricity, thermal solar energy, wood energy, biofuels and heat pumps. (A.L.B.)

  10. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  11. 40 CFR 62.14432 - When must my waste management plan be completed?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  12. Women's Leadership in the ACR, 2001-2015.

    Science.gov (United States)

    Patel, Amy K; Fielding, Julia; Macura, Katarzyna J; Applegate, Kimberly E; Zackula, Rosalee; Arleo, Elizabeth Kagan

    2017-06-01

    To assess the trends of women in voluntary leadership roles in the ACR from 2001 to 2015. Retrospective leadership records from 2001 to 2015 were collected from the ACR Membership Database based on member demographics, gender, and participation in leadership roles at the national and state level. Data were sorted by gender and year to assess the proportion of women in each leadership position relative to total member/representation counts. Overall, there were increasing numbers of women represented in ACR leadership. From 2001 to 2015, there were increasing rates of women achieving fellowship in the College (7%-11%), now at parity with male member rates. Representation by women has risen from 7% to 21% for state chapter presidents and from 14% to 18% for state councilors. Comparing rolling 5-year averages from 2001-2005 and 2011-2015 showed statistically significant increases (P leadership roles. Women members of the council steering committee rose from 13% in 2001 to 19% in 2015, peaking at 24% in 2014. The Board of Chancellors (BOC) showed the largest increase in women, from 9% to 33%, with a peak at 37% in 2014. However, no BOC chairs were women, one council speaker was a woman, two women were ACR presidents, and two women were vice presidents. Women's participation in ACR leadership has increased significantly at the state level and in fellowship recognition. Although there are increasing numbers of women on the BOC, top positions remain male-dominated at the national level. Published by Elsevier Inc.

  13. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  14. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  15. Nuclear safety in France in 2001; La surete nucleaire en France en 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This press dossier summarizes the highlights of nuclear safety in France in 2001: the point-of-view of A.C. Lacoste, director of the French authority of nuclear safety (ASN), the new organisation of the control of nuclear safety and radiation protection, the ASN's policy of transparency, the evolutions of nuclear fuels and the consistency of the fuel cycle, the necessary evolutions of the nuclear crisis management, the harmonizing work of safety approaches carried out by the WENRA association. The following documents are attached in appendixes: the decrees relative to the reformation of the nuclear control in France, the missions of the ASN, the control of nuclear safety and radiation protection in France, the organization of ASN in March 2000, the incidents notified in 2001, the inspections performed in 2001, and the list of the main French nuclear sites. (J.S.)

  16. White Sturgeon Management Plan in the Snake River between Lower Granite and Hells Canyon Dams; Nez Perce Tribe, 1997-2005 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe Resources Management Staff, (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

    2005-09-01

    White sturgeon in the Hells Canyon reach (HCR) of the Snake River are of cultural importance to the Nez Perce Tribe. However, subsistence and ceremonial fishing opportunities have been severely limited as a result of low numbers of white sturgeon in the HCR. Hydrosystem development in the Columbia River Basin has depressed numbers and productivity of white sturgeon in the HCR by isolating fish in impounded reaches of the basin, restricting access to optimal rearing habitats, reducing the anadromous forage base, and modifying early life-history habitats. Consequently, a proactive management plan is needed to mitigate for the loss of white sturgeon production in the HCR, and to identify and implement feasible measures that will restore and rebuild the white sturgeon population to a level that sustains viability and can support an annual harvest. This comprehensive and adaptive management plan describes the goals, objectives, strategies, actions, and expected evaluative timeframes for restoring the white sturgeon population in the HCR. The goal of this plan, which is to maintain a viable, persistent population that can support a sustainable fishery, is supported by the following objectives: (1) a natural, stable age structure comprising both juveniles and a broad spectrum of spawning age-classes; (2) stable or increasing numbers of both juveniles and adults; (3) consistent levels of average recruitment to ensure future contribution to reproductive potential; (4) stable genetic diversity comparable to current levels; (5) a minimum level of abundance of 2,500 adults to minimize extinction risk; and (6) provision of an annual sustainable harvest of 5 kg/ha. To achieve management objectives, potential mitigative actions were developed by a Biological Risk Assessment Team (BRAT). Identified strategies and actions included enhancing growth and survival rates by restoring anadromous fish runs and increasing passage opportunities for white sturgeon, reducing mortality rates

  17. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  18. Proceedings of Alberta's environment conference 2005 : connecting and collaborating

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    Alberta's environmental management and leadership was discussed with reference to opportunities to collaborate in managing, protecting and sustaining the environment. Alberta has already made substantial achievements since it established the Environment Ministry in 1971. Achievements include Canada's first recycling programs for tires, bottles and electronics, and a climate change action plan. Currently, 90 per cent of the government's electricity needs are supplied by wind power from Pincher Creek and biomass from Grand Prairie. The conference themes for the 2005 conference were: partnering for success to support environmental management; sharing knowledge and new research results through environmental monitoring and reporting; future trends and the vision for environmental management and resource development; and, programs and policy that support environmental management. The conference featured 25 presentations, of which 5 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  19. Nevada Test Site 2001 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    Y. E. Townsend

    2002-06-01

    Environmental monitoring data, subsidence monitoring data, and meteorology monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) (refer to Figure 1). These monitoring data include radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada (BN) reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorology data indicate that 2001 was an average rainfall year: rainfall totaled 150 mm (5.9 in) at the Area 3 RWMS and 120 mm (4.7 in) at the Area 5 RWMS. Vadose zone monitoring data indicate that 2001 rainfall infiltrated less than one meter (3 ft) before being returned to the atmosphere by evaporation. Soil-gas tritium monitoring data indicate slow subsurface migration, and tritium concentrations in biota were lower than in previous years. All 2001 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility performance assessments

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  1. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  2. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  3. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  4. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  5. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  6. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  7. La Reconstrucción un proceso integrado por mejorar: contribuciones para la elaboración del plan regulador, experiencia inundaciones enero 2005, Caribe de Costa Rica

    Directory of Open Access Journals (Sweden)

    Esquivel Valverde, Lidier

    2005-08-01

    Full Text Available El documento hace un análisis sobre la importancia de tomar en cuenta medidas de prevención y mitigación en la última fase de una emergencia: la reconstrucción. Describe en forma general las etapas que se siguen después de una situación extrema de daños y se centra en el Plan Regulador o Plan de Reconstrucción. Presenta el caso de las inundaciones ocurridas en la Provincia de Limón en el año 2005 y un cuadro resumen de los costos generados por sector del Plan Regulador de los Decretos Ejecutivos 32180 y 322111MP-MOPT The document analyses the importance of considering prevention and mitigation measures in the last phase of an emergency: reconstruction. It describes in general the stages following after an extreme damages situation and focuses on the Regulatory Plan or Reconstruction Plan. It presents the case of the floods in Limón, 2005 and a summary chart with the costs generated by sector of the Regulatory Plan, Executive Decrees 32180 and 322111MP-MOPT

  8. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  9. Comet P/2001 Q5 (Linear-Neat)

    Czech Academy of Sciences Publication Activity Database

    Lawrence, K. J.; Helin, E. F.; Pravdo, S. H.; Spahr, T. B.; Tichý, M.; Kotková, Lenka; Galad, A.; Kalmančok, D.; Balam, D.; Shelus, P. J.

    č. 7697 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  10. Comet P/2001 TU 80 (Linear-Neat)

    Czech Academy of Sciences Publication Activity Database

    Kušnirák, Peter

    č. 7753 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet s * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  11. Management plan of useful life; Plan de gestion de vida util

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Zapata, J. D.

    2009-07-01

    The Cofrentes NPP Life Management Plan is a plant management program that covers all those activities aimed at monitoring, controlling and mitigating the effects of ageing in the safety-related structures, systems and components, as well as in the equipment that is of particular importance for long-term availability of the plant. the methodology used is based on the system and methods of the so-called UNESA Methodology, whose safety-related aspects have been updated with the application of criteria defined in Licensing Renewal regulation 10 CFR 54. the text develops the details of this plan and describes its status at the present time. (Author)

  12. Soedra's ecological forest management plans. Effects on production and economy

    International Nuclear Information System (INIS)

    Viklund, E.

    1998-01-01

    In 1995 SOEDRA Skog, Sweden's largest forest owners association, started making ecological forest management plans, Groena skogsbruksplaner. The ecological forest management plans are divided into different compartments in which the management is adapted to the present ecological conditions. The stands are divided into four different categories depending on the different values of nature conservation. The object of this study was to find an easy method to quantify and describe the effects of nature conservation on economy and forest production in SOEDRA:s ecological forest management plans. The developed and purposed method, called PLAN-metoden, does not consider the interests, measures beyond the period of the plan, or losses due to snow or wind. It calculates the difference between the purposed measures in the ecological management plan and an alternative with management according to the requirements of the present Forestry Act. The economic effects of nature conservation varies between a net profit of 0,3% and a cost of 9,1% when calculated with the cash-flow method. The average decrease of possible cutting of merchantable timber was 11,3% and varies between 3,1 and 32,9%. The average decrease of cutting possibilities was 12,9% and varies between a decrease of 0,7% and a decrease of 28,3% when calculated with a present value method. Mainly mature, well-stocked compartments, which are considered not to be managed in the future, give rise to high costs. Properties with unprofitable thinnings and costly scarification, regeneration and cleaning seem to be favoured by the nature conservation in the plans. The Ecological management plans are expected to be of great importance to the members of SOEDRA. The interest in nature conservation is larger than that of economical issues. In order to avoid unsatisfactory results the planning should be accomplished in close personal contact with the forest owner Examination paper 1998-1. 21 refs, 2 figs, 39 tabs

  13. 340 waste handling complex: Deactivation project management plan

    International Nuclear Information System (INIS)

    Stordeur, R.T.

    1998-01-01

    This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford's 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case

  14. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  15. Sustainable development report 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The Gaz de France strategic choices and management systems have long been inspired by the principles of sustainable development. This document presents the involvement of the Group in this policy: the profile of the gaz de France group, the highlights 2005, from the strategy to the action, the corporate culture of sharing and the dialogue, the corporate governance, the performance 2005 and indicators and external evaluation. (A.L.B.)

  16. Strategic Planning and Accountability in Irish Education

    Science.gov (United States)

    Gleeson, Jim; O Donnabhain, Diarmaid

    2009-01-01

    This article considers the impact of the New Public Management culture on Irish education and calls for a debate in relation to the prevailing bureaucratic model of accountability. The influence of the Lisbon Agenda (2000) on education planning is identified and the 2005/7 Education Strategy Statement is analysed using the relevant OECD framework.…

  17. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  18. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  19. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  20. 40 CFR 60.2900 - When must I submit my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  1. CONCEPTUAL CLARIFICATION OF PLANNING AND STRATEGIC THINKING IN HUMAN RESOURCE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Matei ȘTEFAN

    2013-10-01

    Full Text Available Many of the concepts and techniques for strategic management have been developed and successfully applied within many companies. As managers are trying to manage better and to face the changes in economical climate, a company develops over four phases of strategic actions and management. These phases consist of basic financial planning, prognosis-based planning, external environment oriented planning and strategic management. Moreover, strategic management consists of four basic elements which ensure a structured format for examination of company strategies: scanning the business environment, strategy formulation, strategy implementation, evaluation and control.

  2. National Ignition Facility Site Management Plan

    International Nuclear Information System (INIS)

    Roberts, V.

    1997-01-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1 degree C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  3. National Ignition Facility Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, V.

    1997-09-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1{degree}C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  4. Una aproximación empírica a la relación entre el desempleo y las vacantes para Popayán, 2001-2005

    Directory of Open Access Journals (Sweden)

    Jhon James Mora

    2006-12-01

    Full Text Available Este artículo presenta evidencia empírica sobre la relación entre las vacantes y el desempleo, a través de la Curva de Beveridge, para la ciudad de Popayán entre 2001 y 2005, siguiendo un modelo de datos de panel por áreas de desempeño. Los resultados del modelo muestran que la elasticidad del desempleo con respecto a las vacantes es estadísticamente significativa y positiva. Este resultado puede deberse a la existencia de shocks asimétricos en los distintos sectores de la economía payanés, que se estarían reflejando en la dinámica de las áreas de desempeño laboral. De esta forma, se estaría presentando una recomposición de las actividades económicas de la ciudad de Popayán durante el período estudiado.

  5. Technical Cooperation Report for 2005. Report by the Director General

    International Nuclear Information System (INIS)

    2006-09-01

    The Technical Cooperation Report for 2005 provides highlights of activities and achievements of the technical cooperation (TC) programme for the past year. The document also describes developments regarding the management of the programme and financial matters. Engaging and maintaining partners for development remained a priority for the Secretariat. During 2005, cooperation with the United Nations Development Programme/Global Environment Facility continued with a project in Africa regarding the management of the Nubian sandstone aquifer system. The TC programme is also playing a role in programmes funded through the World Bank (Guarani Aquifer Project), Asian Development Bank (Clean Air Initiative for Asian Cities) and African Development Bank (Southern Rift Valley Tsetse Eradication Project in Ethiopia and tsetse projects in other countries). TC programme activities during 2005 continued to support Member States in developmental areas related to nuclear science and technology. The spectrum of activities included the development of a system for the disposal of sealed radioactive sources; providing expert advice and computer applications for energy planning; training nuclear medicine specialists and radiation oncologists; continuing the core conversion of research reactor fuel from highly enriched uranium to low enriched uranium; and evaluating and monitoring a marine ecosystem for pollution sources and developing remedial actions. Along with implementing the programme for 2005, Secretariat staff were involved in the final phases of the change initiative. The new structure for the Department of Technical Cooperation took effect as of 9 December 2005. The review of programming processes evolved into the development of the Programme Cycle Management Framework. This approach to TC programming is facilitated by a web-based platform for stakeholders to develop and manage TC projects from concept through project design, approval, implementation and evaluation. To

  6. Technical Cooperation Report for 2005. Report by the Director General

    International Nuclear Information System (INIS)

    2006-08-01

    The Technical Cooperation Report for 2005 provides highlights of activities and achievements of the technical cooperation (TC) programme for the past year. The document also describes developments regarding the management of the programme and financial matters. Engaging and maintaining partners for development remained a priority for the Secretariat. During 2005, cooperation with the United Nations Development Programme/Global Environment Facility continued with a project in Africa regarding the management of the Nubian sandstone aquifer system. The TC programme is also playing a role in programmes funded through the World Bank (Guarani Aquifer Project), Asian Development Bank (Clean Air Initiative for Asian Cities) and African Development Bank (Southern Rift Valley Tsetse Eradication Project in Ethiopia and tsetse projects in other countries). TC programme activities during 2005 continued to support Member States in developmental areas related to nuclear science and technology. The spectrum of activities included the development of a system for the disposal of sealed radioactive sources; providing expert advice and computer applications for energy planning; training nuclear medicine specialists and radiation oncologists; continuing the core conversion of research reactor fuel from highly enriched uranium to low enriched uranium; and evaluating and monitoring a marine ecosystem for pollution sources and developing remedial actions. Along with implementing the programme for 2005, Secretariat staff were involved in the final phases of the change initiative. The new structure for the Department of Technical Cooperation took effect as of 9 December 2005. The review of programming processes evolved into the development of the Programme Cycle Management Framework. This approach to TC programming is facilitated by a web-based platform for stakeholders to develop and manage TC projects from concept through project design, approval, implementation and evaluation. To

  7. Technical Cooperation Report for 2005. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-08-15

    The Technical Cooperation Report for 2005 provides highlights of activities and achievements of the technical cooperation (TC) programme for the past year. The document also describes developments regarding the management of the programme and financial matters. Engaging and maintaining partners for development remained a priority for the Secretariat. During 2005, cooperation with the United Nations Development Programme/Global Environment Facility continued with a project in Africa regarding the management of the Nubian sandstone aquifer system. The TC programme is also playing a role in programmes funded through the World Bank (Guarani Aquifer Project), Asian Development Bank (Clean Air Initiative for Asian Cities) and African Development Bank (Southern Rift Valley Tsetse Eradication Project in Ethiopia and tsetse projects in other countries). TC programme activities during 2005 continued to support Member States in developmental areas related to nuclear science and technology. The spectrum of activities included the development of a system for the disposal of sealed radioactive sources; providing expert advice and computer applications for energy planning; training nuclear medicine specialists and radiation oncologists; continuing the core conversion of research reactor fuel from highly enriched uranium to low enriched uranium; and evaluating and monitoring a marine ecosystem for pollution sources and developing remedial actions. Along with implementing the programme for 2005, Secretariat staff were involved in the final phases of the change initiative. The new structure for the Department of Technical Cooperation took effect as of 9 December 2005. The review of programming processes evolved into the development of the Programme Cycle Management Framework. This approach to TC programming is facilitated by a web-based platform for stakeholders to develop and manage TC projects from concept through project design, approval, implementation and evaluation. To

  8. Technical Cooperation Report for 2005. Report by the Director General

    International Nuclear Information System (INIS)

    2006-08-01

    The Technical Cooperation Report for 2005 provides highlights of activities and achievements of the technical cooperation (TC) programme for the past year. The document also describes developments regarding the management of the programme and financial matters. Engaging and maintaining partners for development remained a priority for the Secretariat. During 2005, cooperation with the United Nations Development Programme/Global Environment Facility continued with a project in Africa regarding the management of the Nubian sandstone aquifer system. The TC programme is also playing a role in programmes funded through the World Bank (Guarani Aquifer Project), Asian Development Bank (Clean Air Initiative for Asian Cities) and African Development Bank (Southern Rift Valley Tsetse Eradication Project in Ethiopia and tsetse projects in other countries). TC programme activities during 2005 continued to support Member States in developmental areas related to nuclear science and technology. The spectrum of activities included the development of a system for the disposal of sealed radioactive sources; providing expert advice and computer applications for energy planning; training nuclear medicine specialists and radiation oncologists; continuing the core conversion of research reactor fuel from highly enriched uranium to low enriched uranium; and evaluating and monitoring a marine ecosystem for pollution sources and developing remedial actions. Along with implementing the programme for 2005, Secretariat staff were involved in the final phases of the change initiative. The new structure for the Department of Technical Cooperation took effect as of 9 December 2005. The review of programming processes evolved into the development of the Programme Cycle Management Framework. This approach to TC programming is facilitated by a web-based platform for stakeholders to develop and manage TC projects from concept through project design, approval, implementation and evaluation. To

  9. Language barrier, funding, communication and time management problems found in the Medical Journal of Indonesia, 1995 - 2001

    Directory of Open Access Journals (Sweden)

    Isnani A. Suryono

    2001-12-01

    Full Text Available The objective of this study is to assess the problems encountered in the management of Medical Journal of Indonesia and whether any progress has been achieved during the past 7 years. A retrospective descriptive study was done in the MJI. Available data used as parameters were: number of articles submitted and author's home institution, number of articles submitted and rejected, cause/criteria of rejection, qualification of reviewers and editors, duration of manuscript processing, and whether pre-scheduled time is met in the Med J Indones. For this purpose, all manuscripts from January 1995- January 2001 were evaluated. In addition, recent problems encountered were noted. Problems encountered were limited supply of manuscript that might be due to language barrier, decrease in circulation due to limited budget, communication problems due to seniority, and increase in average processing time that might be due to restriction in the time allocated for MJI Number of articles submitted by authors originating from national versus foreign institutions in 1995-1997 was 101 versus 16, and in 1998 - 2000 were 124 versus 84. Articles rejected were ±26.4 % (1999-2001 and the most frequent causes of rejection were insignificancy of substance and improper data analysis. As for the qualification of editors there was an increase in the number of PhDs and professors. Average processing time is approximately 1.5 times the scheduled time. It seems that the 4 main problems encountered were (1 Language barrier, (2 Funding, (3 Communication problems and (4 Time management; and though not impressive, there are definitely positive changes in the number of manuscipts submitted, qualification of editors and peer reviewers. Average processing time is about the same, and the prescheduled time of editing is yet to be met. (Med J  Indones 2001; 10: 252-8Keywords: language barrier, funding, communication problems, time management

  10. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  11. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  12. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  13. Community participation in fire management planning: The Trinity county fire safe council's fire plan

    Science.gov (United States)

    Yvonne Everett

    2008-01-01

    In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...

  14. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  15. 14 CFR 136.39 - Air tour management plans (ATMP).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall... of decision. (d) Procedure. In establishing an ATMP for a national park or tribal lands, the...

  16. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  17. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  18. 40 CFR 62.14590 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or... use of recyclable materials. The plan must identify any additional waste management measures, and the...

  19. 40 CFR 60.2630 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation... of recyclable materials. The plan must identify any additional waste management measures, and the...

  20. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system