WorldWideScience

Sample records for management implementation plan

  1. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  2. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  5. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  6. U.S. Department of Energy, defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Chee, T.

    1988-01-01

    This paper reports that the program implementation plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  7. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  8. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  9. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  10. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in ...

  11. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  12. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  13. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  14. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  15. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  16. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  17. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  18. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  19. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  20. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  1. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  2. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  3. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  4. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  5. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  6. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  7. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  8. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  9. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  10. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  11. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  12. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  13. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  14. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  15. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  16. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  17. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  18. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  19. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  20. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  1. On the effectiveness in implementing a waste-management-plan method in construction

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method

  2. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  4. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  5. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  6. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan; Yolo-Solano Air Quality Management District AGENCY: Environmental... revision to the Yolo-Solano Air Quality Management District portion of the California State Implementation...-Solano Air Quality Management District (YSAQMD) Rule 2.41, adopted on September 10, 2008, and submitted...

  7. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  8. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  9. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  10. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  11. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  12. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  13. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State... for the South Coast Air Quality Management District (SCAQMD). The Antelope Valley Air Pollution...

  14. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura.... SUMMARY: EPA is finalizing approval of revisions to the Antelope Valley Air Quality Management District...

  15. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental Protection Agency (EPA... Air Quality Management District. (1) Rule 1165, ``Glass Melting Furnaces,'' amended on August 25, 2008...

  16. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  17. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  18. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  19. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  20. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  1. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of the... approving with the dates that they were adopted by the Antelope Valley Air Quality Management District...

  2. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  3. The experiences from implementing decision support technology to address water management plans in an operational environment

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, S. [4DM Inc., Toronto, ON (Canada); Tonkin, C. [Ontario Power Generation Inc., Toronto, ON (Canada)

    2005-07-01

    This presentation described Ontario Power Generation's experience in implementing a decision support tool to enable water management plans for its operations through technology solutions. All hydroelectric producers in Ontario are required to make water management plans in order to maintain water levels and flows in their operating regions. This regulation was created in response to environmental concerns as well as to changes in the electricity market and growth of residential and cottage property near water bodies. In order to keep informed and to address compliance issues, operators and managers need situation awareness information to balance operational decisions. The online Adaptive Water Management System (AWMS) decision support tool was recently adopted by Ontario Power Generation to provide information needed to address the requirements of Water Management Plans. The AWMS provides users with information on water levels and flows; the ability to implement, modify, and manage daily instructions at the facilities; track conditions in the watershed; and, provide a status of compliance. The tool was developed by 4DM Inc. in collaboration with Ottawa St. Lawrence Plant Group for the Madawaska River Watershed Management, a model partnership between operator, regulator and Public Advisory Committee to develop a water management plan.

  4. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  5. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  6. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-16

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents...

  7. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  8. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  9. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  10. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  11. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...

  12. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... not a ``significant regulatory action'' subject to review by the Office of Management and Budget under...

  13. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'s Designee. (i) Incorporation by Reference. (A) South Coast Air Quality Management District. (1...

  14. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-01-25

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  15. 75 FR 37308 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-06-29

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...) * * * (i) * * * (C) Yolo Solano Air Quality Management District (1) Rule 3.21, ``Rice Straw Emission...

  16. Operational considerations for implementing regional sediment management plans in the northern Gulf of Mexico

    Science.gov (United States)

    Underwood, Steven G.; Khalil, Syed M.; Byrnes, Mark R.; Steyer, Gregory D.; Raynie, Richard C

    2015-01-01

    Development of a comprehensive and stakeholder-driven Regional Sediment Management plan can provide the basis for long-term sustainable resource use and protection. This paper highlights three operational components that can positively influence sediment management at a regional scale, including (1) integration of an operational sediment budget, (2) development of a monitoring and adaptive management plan, and (3) development of a regional sediment availability and allocation program. These components seek to incorporate science and adaptive management through implementation of an organized and well-documented decision making process. They represent a coordinated framework that could serve as a guide for unifying financial investments in regional sediment management plans. Collectively, they establish an integrated process for addressing uncertainties about future system change in light of shrinking federal and state budgets, competing demands for sediment resources within riverine and marine waters, and policy considerations related to sediment/water use (e.g., navigation and commerce versus environmental management).

  17. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2011-08-17

    ... the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality standards... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  18. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0383; FRL-9428-1] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State...

  19. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (Yolo-Solano AQMD) portion of the.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart...

  20. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-01-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Air Quality Management District There are two 1-hour ozone nonattainment areas within the jurisdiction...

  1. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-03-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  2. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-26

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October...

  3. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...

  4. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...,'' Northeast States for Coordinated Air Use Management, December 2000. B. Does the rule meet the evaluation...

  5. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  6. Implementing the 2012 North American Waterfowl Management Plan revision: Populations, habitat, and people

    Science.gov (United States)

    Humburg, Dale D.; Anderson, Michael G.; Brasher, Michael G.; Carter, Michael F.; Eadie, John M.; Fulton, David C.; Johnson, Fred A.; Runge, Michael C.; Vrtiska, Mark P.

    2018-01-01

    The North American Waterfowl Management Plan (NAWMP) has established a model for wildlife conservation planning over the last 3 decades. Management at a continental scale, leveraged funding, regional partnerships, and a strong science basis have been notable features. Periodic updates to the NAWMP occurred since implementation in 1986; however, a fundamental revision was accomplished in 2012 after extensive stakeholder engagement. An explicit fundamental goal for waterfowl conservation supporters was added in 2012, complementing existing goals for sustainable populations and sufficient habitat found in previous updates. We present a synopsis of progress toward implementation of the 2012 NAWMP and challenge the waterfowl management community to continue with meaningful steps toward achieving NAWMP goals. Adding goals and objectives for supporters increases potential relevance of NAWMP; however, it also presents a level of complexity that was not entirely anticipated. Additionally, the 2012 NAWMP recognized that traditional support from waterfowl hunters alone will not be sufficient to support waterfowl conservation in the future. Simultaneous consideration of multiple objectives, although implicit before, now is a specific focus for habitat and harvest management affecting hunters and other users of the waterfowl resource. The waterfowl management community is faced with revisiting objectives and management actions related to harvest regulations, landscape priorities, habitat conservation, and public engagement to garner broader support. These persistent management challenges are tangible and relevant candidates for greater integration. Ultimately, the structures and processes supporting waterfowl management also will need to be reconsidered.

  7. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD...

  8. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  9. 77 FR 74372 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-12-14

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... of South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... of Appeals for the District of Columbia Circuit. South Coast Air Quality Management District v. EPA...

  10. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); does...

  11. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... action: Is not a ``significant regulatory action'' subject to review by the Office of Management and...

  12. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0987; FRL-9617-5] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  13. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0394; FRL-9845-4] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  14. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  15. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Science.gov (United States)

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  16. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  17. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  18. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  19. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  20. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  1. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  2. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-06-24

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Index rather than on 1-hour ozone forecasted values; (b) forecast criteria for allowing a...

  3. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... submit regulations that control the primary and secondary National Ambient Air Quality Standards (NAAQS...

  4. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Standards (NAAQS). The revisions to the primary and secondary Lead NAAQS were to provide increased...

  5. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  6. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  7. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9432-1] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  8. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0030; FRL-9308-4] Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State...

  9. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  10. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0503; FRL-9183-5] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  11. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0897; FRL-9499-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  12. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-04-16

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State.... ``Improving Air Quality with Economic Incentive Programs,'' EPA- 452/R-01-001, January 2001. B. Does the rule...

  13. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0286; FRL-9138-7] Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...

  14. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  15. Implementing Total Quality Management in a University Setting.

    Science.gov (United States)

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  16. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  17. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  18. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  19. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  20. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  1. Job sharing in clinical nutrition management: a plan for successful implementation.

    Science.gov (United States)

    Visocan, B J; Herold, L S; Mulcahy, M J; Schlosser, M F

    1993-10-01

    While women continue to enter the American work force in record numbers; many experience difficulty in juggling career and family obligations. Flexible scheduling is one option used to ease work and family pressures. Women's changing work roles have potentially noteworthy implications for clinical nutrition management, a traditionally female-dominated profession where the recruitment and retention of valued, experienced registered dietitians can prove to be a human resources challenge. Job sharing, one type of flexible scheduling, is applicable to the nutrition management arena. This article describes and offers a plan for overcoming obstacles to job sharing, including determining feasibility, gaining support of top management, establishing program design, announcing the job share program, and using implementation, monitoring, and fine-tuning strategies. Benefits that can be derived from a successful job share are reduced absenteeism, decreased turnover, enhanced recruitment, improved morale, increased productivity, improved job coverage, and enhanced skills and knowledge base. A case study illustrates one method for achieving job sharing success in clinical nutrition management.

  2. Opportunity costs of implementing forest plans

    Science.gov (United States)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  3. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  4. Management Cycle: from Planning to Evaluation

    OpenAIRE

    Kova?i?, Luka; Jakši?, Želimir

    2008-01-01

    The planning process in health care known as management cycle or cycle of organization and management is described. The cycle is divided in four main elements: planning, organization, implementation and evaluation. Each element is defined and described.

  5. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  6. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    Science.gov (United States)

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  7. Consolidating tactical planning and implementation frameworks for integrated vector management in Uganda.

    Science.gov (United States)

    Okia, Michael; Okui, Peter; Lugemwa, Myers; Govere, John M; Katamba, Vincent; Rwakimari, John B; Mpeka, Betty; Chanda, Emmanuel

    2016-04-14

    Integrated vector management (IVM) is the recommended approach for controlling some vector-borne diseases (VBD). In the face of current challenges to disease vector control, IVM is vital to achieve national targets set for VBD control. Though global efforts, especially for combating malaria, now focus on elimination and eradication, IVM remains useful for Uganda which is principally still in the control phase of the malaria continuum. This paper outlines the processes undertaken to consolidate tactical planning and implementation frameworks for IVM in Uganda. The Uganda National Malaria Control Programme with its efforts to implement an IVM approach to vector control was the 'case' for this study. Integrated management of malaria vectors in Uganda remained an underdeveloped component of malaria control policy. In 2012, knowledge and perceptions of malaria vector control policy and IVM were assessed, and recommendations for a specific IVM policy were made. In 2014, a thorough vector control needs assessment (VCNA) was conducted according to WHO recommendations. The findings of the VCNA informed the development of the national IVM strategic guidelines. Information sources for this study included all available data and accessible archived documentary records on VBD control in Uganda. The literature was reviewed and adapted to the local context and translated into the consolidated tactical framework. WHO recommends implementation of IVM as the main strategy to vector control and has encouraged member states to adopt the approach. However, many VBD-endemic countries lack IVM policy frameworks to guide implementation of the approach. In Uganda most VBD coexists and could be managed more effectively if done in tandem. In order to successfully control malaria and other VBD and move towards their elimination, the country needs to scale up proven and effective vector control interventions and also learn from the experience of other countries. The IVM strategy is important in

  8. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  9. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  10. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  11. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  12. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  13. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  14. Reduction of mercury in plant effluents data management implementation plan FY 1998 Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Fischer, K.N.; Forsberg, V.M.

    1998-01-01

    The purpose of the Data Management Implementation Plan (DMIP) is to document the requirements and responsibilities for managing, using, and archiving data used for the Reduction of Mercury in Plant Effluents (RMPE) project. The DMIP was created for the RMPE project in accordance with the guidance given in Environmental Data Management Implementation Handbook for the Environmental Restoration Program (ES/ER/TM- 88/R 1) and in ''Developing, implementing, and Maintaining Data Management Implementation Plans'' (EMEF/ER-P2216, Rev. 0). This document reflects the state of the RMPE project and the types of environmental monitoring planned as they existed through March 16, 1998. The scope of this document is the management of the RMPE project's environmental information, which includes electronic or hard copy records describing environmental processes or conditions. The RMPE program was established as a best management practice to address sources in the Y-12 Plant that contribute mercury to plant effluents being discharged to Upper East Fork Poplar Creek. The strategy is multifaceted: reroute clean water through clean conduits; clean, reline, and/or replace mercury-contaminated water conduits; eliminate or reduce accumulations of mercury in tanks and sumps; isolate inaccessible mercury from contact with water; and install treatment capability for streams where the source(s) cannot be eliminated or mitigated to acceptable levels. The RMPE project database consists of data from surface water monitoring and sediment sampling at locations of interest within the Y-12 Plant. This DMIP describes the types and sources of RMPE data, other data systems relevant to the RMPE project, the different data management interactions and flow of information involved in processing RMPE data, and the systems used in data management

  15. Innovative Activities to Ensure Safety: Strategy and Plans to Implement Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Eremin, S.; Tikhonov, N.; Yuzhakov, A.

    2016-01-01

    Full text: The Russian operating organization Concern Rosenergoatom established a program for a knowledge management (KM) implementation in the organization as part of ROSATOM State Corporation KM activities. The plan includes activities both in the framework of the classic knowledge management cycle: detection, preservation, retention, sharing and transfer, as well as creation of new knowledge such as training programs for the construction of new nuclear power plants. The approach embraces key techniques overviewed in IAEA documents on KM, and ROSATOM’s strategical focus on the commercial use of R&D results and corporate knowledge and, thus, contribute to safe, reliable and efficient operation of NPPs. (author

  16. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  17. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  18. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  19. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  20. 40 CFR 763.93 - Management plans.

    Science.gov (United States)

    2010-07-01

    ... implementation in a timely fashion. (d) Each local education agency shall maintain and update its management plan... surveillance and training. (12) With respect to each consultant who contributed to the management plan, the name of the consultant and one of the following statements: (i) If the State has adopted a contractor...

  1. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  2. Succession planning for RNs: implementing a nurse management internship.

    Science.gov (United States)

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  3. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  4. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  5. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management of...

  6. Sustainable Forest Management in Cameroon Needs More than Approved Forest Management Plans

    Directory of Open Access Journals (Sweden)

    Paolo Omar. Cerutti

    2008-12-01

    Full Text Available One of the main objectives of the 1994 Cameroonian forestry law is to improve the management of production forests by including minimum safeguards for sustainability into compulsory forest management plans. As of 2007, about 3.5 million hectares (60% of the productive forests are harvested following the prescriptions of 49 approved management plans. The development and implementation of these forest management plans has been interpreted by several international organizations as long awaited evidence that sustainable management is applied to production forests in Cameroon. Recent reviews of some plans have concluded, however, that their quality was inadequate. This paper aims at taking these few analyses further by assessing the actual impacts that approved management plans have had on sustainability and harvesting of commercial species. We carry out an assessment of the legal framework, highlighting a fundamental flaw, and a thorough comparison between data from approved management plans and timber production data. Contrary to the principles adhered to by the 1994 law, we find that the government has not yet succeeded in implementing effective minimum sustainability safeguards and that, in 2006, 68% of the timber production was still carried out as though no improved management rules were in place. The existence of a number of approved management plans cannot be used a proxy for proof of improved forest management.

  7. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  8. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  9. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  10. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  11. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  12. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  13. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  14. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  15. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  16. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  17. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  18. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  19. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  20. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  1. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  2. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  3. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  4. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories. We are proposing to approve these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  5. Energy management information systems - planning manual and tool

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    An Energy Management Information System (EMIS) provides relevant information that makes energy, performance visible to various levels of an organization, enabling individuals and departments to plan, make decisions and take effective action to manage energy. This manual has two objectives: 1. To enable companies to conduct EMIS audits and prepare EMIS implementation plans; 2. To provide companies with the tools to prepare a financial business case for EMIS implementation. This manual consists of four parts: 1. EMIS Audit is theoretical and provides the methodology to be used by outside or in-house engineers and consultants to do a thorough EMIS Audit. 2. Implementation Plan is to help industry do the work themselves. 3. Appendices is to help the user develop an EMIS Audit, gather data and score their company, prepare a conceptual and detailed design, as well as a business and financial plan for implementation.

  6. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  7. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  8. Effect of Organizational Culture Factors on Knowledge Management Processes Implementation in Technology & Deputy Tax Planning Agency

    Directory of Open Access Journals (Sweden)

    Hamid Rahimian

    2011-10-01

    Full Text Available This research was a case study to evaluate the effect of organizational culture on knowledge management processes implementation in Technology & Deputy Tax Planning Agency was done by Survey Method. Population of the study was experts in Technology & Deputy Tax planning of the organization. Research tools included two questionnaires: the organizational culture profile and the processes of knowledge management. The first questionnaire has surveyed the seven components of organizational culture (competitiveness, social responsibility, supportiveness, innovation, emphasis on rewards, performance orientation, and stability. The second has explored six processes such as creation, capture, organization, storage, dissemination and application of knowledge. The results of this research showed that according to the experts the components of organizational culture and knowledge management were in the intermediate level. Between each of the seven components of organizational culture was 70% positive and significant relationship with knowledge management processes. Also, among each of the seven components of organizational culture was positive and significant relationship with knowledge management processes. Regression analysis gave the same result that only two components of social responsibility and performance orientation in predicting the changing role of knowledge management processes have been effective.

  9. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  10. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  11. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    Science.gov (United States)

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  12. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  13. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  14. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  15. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories for the AVAQMD and SJVUAPCD. We are approving these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  16. Knowledge management implementation and the tools utilized in ...

    African Journals Online (AJOL)

    Knowledge management implementation and the tools utilized in healthcare for ... a knowledge driven process and thus knowledge management and the tools to ... health record systems, communities of practice and advanced care planning.

  17. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  18. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  19. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  20. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  1. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  2. Developing Asset Life Cycle Management capabilities through the implementation of Asset Life Cycle Plans – an Action Research project

    OpenAIRE

    Ruitenburg, Richard; Braaksma, Anne Johannes Jan

    2017-01-01

    Asset Life Cycle Management is a strategic approach to managing physical assets over their complete life cycle. However, the literature and the recent ISO 55,000 standard do not offer guidance as to how to develop such an approach. This paper investigates the main capabilities for Asset Life Cycle Management by means of a four year Action Research project implementing Asset Life Cycle Plans. Five main capabilities emerged: 1. strategic information use; 2. alignment of operations and strategy;...

  3. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  4. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air Pollution Control District (MBUAPCD) and Santa Barbara County Air Pollution Control District (SCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions local rules that address emission statements for AVAQMD, rule rescissions that address public records for MBUAPCD, and define terms for SBCAPCD, under the Clean Air Act as amended in 1990 (CAA or the Act).

  5. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  6. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  7. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  8. Pre-implementation studies of a workforce planning tool for nurse staffing and human resource management in university hospitals.

    Science.gov (United States)

    van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester

    2016-03-01

    To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.

  9. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  10. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  11. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  12. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  13. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions to local rules that define terms used in other air pollution regulations in these areas and a rule rescission that address Petroleum Coke Calcining Operations--Oxides of Sulfur, under the Clean Air Act as amended in 1990 (CAA or the Act).

  14. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  15. An Operational Framework for Insecticide Resistance Management Planning.

    Science.gov (United States)

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  16. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  17. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  18. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  19. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), we are approving local rules that define terms used in other air pollution regulation in these areas and approving a rule rescission that addresses Petroleum Coke Calcining Operations--Oxides of Sulfur.

  20. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  1. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  2. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  3. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  4. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  5. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  6. Community participation in fire management planning: The Trinity county fire safe council's fire plan

    Science.gov (United States)

    Yvonne Everett

    2008-01-01

    In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...

  7. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  8. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  9. 40 CFR 60.2065 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan must... additional waste management measures and implement those measures the source considers practical and feasible, considering the effectiveness of waste management measures already in place, the costs of additional measures...

  10. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  11. Formalizing expert knowledge to compare alternative management plans: sociological perspective to the future management of Baltic salmon stocks

    DEFF Research Database (Denmark)

    Haapasaari, Päivi Elisabet; Karjalainen, Timo P.

    2010-01-01

    Designing and implementing long-term management plans is difficult both because of the complexity of the fisheries system, and the behaviour of humans. We compared four alternative management plans for the Baltic salmon stocks through approaching experts who interpreted and expressed the views of d...... net provides potential for creating a holistic picture of a fishery by combining the data describing fishers’ commitment with biological data regarding fish stock dynamics and with economic data analyzing economically sound fisheries management.......Designing and implementing long-term management plans is difficult both because of the complexity of the fisheries system, and the behaviour of humans. We compared four alternative management plans for the Baltic salmon stocks through approaching experts who interpreted and expressed the views...... of different stakeholder groups on the options. The focus of the study was on stakeholders’ commitment to the alternative management plans. Committing enhances the probability of achieving the ultimate objective of a plan, while if stakeholders do not commit, the effects of the plan may be less predictable...

  12. 40 CFR 60.2901 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Analysis Waste Management Plan § 60.2901 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as... must identify any additional waste management measures and implement those measures the source...

  13. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  14. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  15. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  16. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  17. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  18. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  19. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  20. DOE organization and management approach in responding to recommendation 94-2 - The implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Widmayer, D.

    1995-12-31

    In March, the Department of Energy (DOE) submitted the Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2, {open_quotes}Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Sites.{close_quotes} This paper discusses the management organization and interactions established to accomplish the tasks developed to respond to the DNFSB Recommendation. The organization of the tasks into six technical areas and the interfaces and connections between the tasks are briefly described. A summary of how each significant part of the DNFSB Recommendation is being addressed is presented. This paper provides a brief introduction to the remaining presentations in this session.

  1. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  2. Report: policy drivers and the planning and implementation of integrated waste management in Ireland using the regional approach.

    Science.gov (United States)

    Rudden, P J

    2007-06-01

    Waste management in Ireland has been dramatically transformed over the past 10 years from over 90% reliance on landfill towards a fully integrated approach. According to the latest EPA National Database Report in 2007 our municipal (household and commercial but excluding construction and demolition) recycling rate was 35% in 2005. This has been achieved through the implementation of 10 regional waste management plans all prepared within a new national planning framework in accordance with the Waste Management Act 1996 and Government policy document 'Changing Our Ways', published in 1998 by the Irish Department of the Environment, Heritage and Local Government. The principal drivers of the waste management plans and strategies are the EU Waste Framework Directive (recently revised), the EU Packaging Directive and the EU Landfill Directive. In addition, there were substantial political and environmental drivers due to the relatively poor standard of landfills in Ireland. Strict landfill regulation by the Environment Protection Agency commenced in 1997and led to many closures of poor facilities and new standards of siting design and operation. This has led to very high landfill charges that are only now beginning to stabilize. The key to improving public attitudes to the greatly improving waste management system has been the degree and content of stakeholder involvement programmes. These programmes are now consolidated into a national 'Race against Waste' programme (www.raceagainstwaste.ie). The purpose of the programme is to create awareness and deal with many of the misconceptions in the public mind attached to waste treatment methods especially incineration. Waste management is after all about people.

  3. Implementation of enterprise resource planning systems: a user perspective

    Science.gov (United States)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  4. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  5. South African small and medium-sized enterprise owners’ intention to implement an environmental management system

    Directory of Open Access Journals (Sweden)

    Fredrika (Miemie W. Struwig

    2017-06-01

    Aim: This article investigates South African small and medium-sized enterprise (SME owners’ intentions to implement an environmental management system based on the theory of planned behaviour. Setting: Although large businesses are clearly of interest with respect to their environmental management, especially given their prominence in many of the most environmentally impactful sectors, the relative neglect of the environmental management of SMEs is disconcerting, given their overall importance in most economies. In addition, very little research used the theory of planned behaviour to empirically test SME owners’ intentions, to implement an environmental management system. Method: A quantitative survey was used to collect primary data from 326 SME owners by a structured questionnaire. Results: Regression analysis results confirmed the influence of SME owners’ attitudes towards an environmental management system and pro-environmental norms on their intention to implement an environmental management system. Perceived behavioural control, however, did not significantly influence the SME owners’ intention to implement an environmental management system. Conclusion: These findings provide valuable insights into the implementation of environmental management systems among South African SMEs. The theory of planned behaviour also seems to be an appropriate means to investigate the intentions of SMEs to implement an environmental management system.

  6. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    Science.gov (United States)

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  7. Participative management and shared leadership: implementing a model.

    Science.gov (United States)

    Noonan, D

    1995-01-01

    The author identifies the development, implementation and outcomes of a task subgroup model of management that provides a mechanism for shared leadership, planning, decision making, implementation and evaluation by staff, patients and families on a program level. The conceptual model and its operationalization are outlined within the context of the rehabilitation program at the Providence Centre in Scarborough, Ontario.

  8. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  9. Endangered Species and North American Waterfowl Management Plan Joint Venture Areas

    National Research Council Canada - National Science Library

    Allred, Karla

    1996-01-01

    ...) Endangered Species Recovery Plans that meet the recovery plan requirements; and the percent of Corps acreage included within North American Waterfowl Management Joint Venture Implementation Plans where proposed work has been accomplished...

  10. CONCEPTUAL CLARIFICATION OF PLANNING AND STRATEGIC THINKING IN HUMAN RESOURCE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Matei ȘTEFAN

    2013-10-01

    Full Text Available Many of the concepts and techniques for strategic management have been developed and successfully applied within many companies. As managers are trying to manage better and to face the changes in economical climate, a company develops over four phases of strategic actions and management. These phases consist of basic financial planning, prognosis-based planning, external environment oriented planning and strategic management. Moreover, strategic management consists of four basic elements which ensure a structured format for examination of company strategies: scanning the business environment, strategy formulation, strategy implementation, evaluation and control.

  11. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  12. Implementing ecosystem-based marine management as a process of regionalisation

    DEFF Research Database (Denmark)

    Hegland, Troels Jacob; Raakjær, Jesper; van Tatenhove, Jan

    2015-01-01

    and the Baltic Sea Fisheries Forum, both examples of regionalisation processes in order to implement ecosystem-based marine management. The Helsinki Commission Group for implementation of the ecosystem approach is a joint management body for the implementation of the Baltic Sea Action Plan and the European Union......This article deals with the implementation of ecosystem-based marine management in the Baltic Sea. It explores and documents in particular the preliminary lessons from environmental and fisheries management with reference to the Helsinki Commission Group for implementation of the ecosystem approach......'s Marine Strategy Framework Directive. The Baltic Sea Fisheries Forum is a new governing body to facilitate regional cooperation in fisheries management. The aim of the article is twofold: a) to describe and discuss two different pathways of regionalisation in the Baltic Sea and b) to explore how...

  13. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  14. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  15. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  16. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  17. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  18. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  19. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  20. Best management practices for creating a community wildfire protection plan

    Science.gov (United States)

    Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams

    2012-01-01

    A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...

  1. Earned Value Management (EVM) Implementation Handbook

    Science.gov (United States)

    Terrell, Stefanie M.; Richards, Brad W.

    2018-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  2. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  3. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  4. 76 FR 55541 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia: Kentucky; Ohio...

    Science.gov (United States)

    2011-09-07

    ... Cabell and Wayne Counties in their entireties and a portion of Mason County (Graham Tax District) in West... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S...

  5. Collaborative planning approach to inform the implementation of a healthcare manager intervention for hispanics with serious mental illness: a study protocol

    Directory of Open Access Journals (Sweden)

    Cabassa Leopoldo J

    2011-07-01

    Full Text Available Abstract Background This study describes a collaborative planning approach that blends principles of community-based participatory research (CBPR and intervention mapping to modify a healthcare manager intervention to a new patient population and provider group and to assess the feasibility and acceptability of this modified intervention to improve the physical health of Hispanics with serious mental illness (SMI and at risk for cardiovascular disease (CVD. Methods The proposed study uses a multiphase approach that applies CBPR principles and intervention-mapping steps--an intervention-planning approach--to move from intervention planning to pilot testing. In phase I, a community advisory board composed of researchers and stakeholders will be assembled to learn and review the intervention and make initial modifications. Phase II uses a combination of qualitative methods--patient focus groups and stakeholder interviews--to ensure that the modifications are acceptable to all stakeholders. Phase III uses results from phase II to further modify the intervention, develop an implementation plan, and train two care managers on the modified intervention. Phase IV consists of a 12-month open pilot study (N = 30 to assess the feasibility and acceptability of the modified intervention and explore its initial effects. Lastly, phase V consists of analysis of pilot study data and preparation for future funding to develop a more rigorous evaluation of the modified intervention. Discussion The proposed study is one of the few projects to date to focus on improving the physical health of Hispanics with SMI and at risk for CVD by using a collaborative planning approach to enhance the transportability and use of a promising healthcare manager intervention. This study illustrates how blending health-disparities research and implementation science can help reduce the disproportionate burden of medical illness in a vulnerable population.

  6. Collaborative planning approach to inform the implementation of a healthcare manager intervention for Hispanics with serious mental illness: a study protocol.

    Science.gov (United States)

    Cabassa, Leopoldo J; Druss, Benjamin; Wang, Yuanjia; Lewis-Fernández, Roberto

    2011-07-26

    This study describes a collaborative planning approach that blends principles of community-based participatory research (CBPR) and intervention mapping to modify a healthcare manager intervention to a new patient population and provider group and to assess the feasibility and acceptability of this modified intervention to improve the physical health of Hispanics with serious mental illness (SMI) and at risk for cardiovascular disease (CVD). The proposed study uses a multiphase approach that applies CBPR principles and intervention-mapping steps--an intervention-planning approach--to move from intervention planning to pilot testing. In phase I, a community advisory board composed of researchers and stakeholders will be assembled to learn and review the intervention and make initial modifications. Phase II uses a combination of qualitative methods--patient focus groups and stakeholder interviews--to ensure that the modifications are acceptable to all stakeholders. Phase III uses results from phase II to further modify the intervention, develop an implementation plan, and train two care managers on the modified intervention. Phase IV consists of a 12-month open pilot study (N = 30) to assess the feasibility and acceptability of the modified intervention and explore its initial effects. Lastly, phase V consists of analysis of pilot study data and preparation for future funding to develop a more rigorous evaluation of the modified intervention. The proposed study is one of the few projects to date to focus on improving the physical health of Hispanics with SMI and at risk for CVD by using a collaborative planning approach to enhance the transportability and use of a promising healthcare manager intervention. This study illustrates how blending health-disparities research and implementation science can help reduce the disproportionate burden of medical illness in a vulnerable population.

  7. Prospects and Challenges of Implementing the Hydrographic Region VIII Basin Plan

    Directory of Open Access Journals (Sweden)

    Nathalia Silva Duarte

    2011-12-01

    Full Text Available The current “National Water Law” states that water resources plans must be elaborated by basins, states, and for the country. This essay discusses the water management process considering federal and state legislations and their interrelations, for the purpose of elucidating the gaps found in them , aiming at their applicability to the system of water resources management within the CBH- Macaé and Ostras scope. It also discusses the construction and evolution process of the above-mentioned committee, and developments in the implementation of the Basin Plan of Hydrographic Region VIII.

  8. Estuary ecosystem restoration: implementing and institutionalizing adaptive management: Institutionalizing adaptive management

    Energy Technology Data Exchange (ETDEWEB)

    Ebberts, Blaine D. [Portland District, U.S. Army Corps of Engineers, 333 SW 1st Avenue, Portland OR 97204 U.S.A.; Zelinsky, Ben D. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Karnezis, Jason P. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Studebaker, Cynthia A. [Portland District, U.S. Army Corps of Engineers, 333 SW 1st Avenue, Portland OR 97204 U.S.A.; Lopez-Johnston, Siena [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Creason, Anne M. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Krasnow, Lynne [Columbia Hydropower Branch, National Marine Fisheries Service, 1201 NE Lloyd Boulevard Suite 1100, Portland OR 97232 U.S.A.; Johnson, Gary E. [Pacific Northwest National Laboratory, 620 SW 5th Avenue, Suite 810, Portland OR 97204 U.S.A.; Thom, Ronald M. [Pacific Northwest National Laboratory, Marine Science Laboratory, 1286 Washington Harbor Road, Sequim WA 98382 U.S.A.

    2017-08-25

    We successfully implemented and institutionalized an adaptive management (AM) process for the Columbia Estuary Ecosystem Restoration Program, which is a large-scale restoration program focused on improving ecosystem conditions in the 234-km lower Columbia River and estuary. For our purpose, “institutionalized” means the AM process and restoration program are embedded in the work flow of the implementing agencies and affected parties. While plans outlining frameworks, processes, or approaches to AM of ecosystem restoration programs are commonplace, establishment for the long term is not. This paper presents the basic AM framework and explains how AM was implemented and institutionalized. Starting with a common goal, we pursued included a well-understood governance and decision-making structure, routine coordination and communication activities, data and information sharing, commitment from partners and upper agency management to the AM process, and meaningful cooperation among program managers and partners. The overall approach and steps to implement and institutionalize AM for ecosystem restoration explained here are applicable to situations where it has been less than successful or, as in our case, the restoration program is just getting started.

  9. Risk Management for Enterprise Resource Planning Post Implementation Using COBIT 5 for Risk

    OpenAIRE

    Indah, Dwi Rosa; Harlili, Harlili; Firdaus, Afriyan

    2014-01-01

    Risk management for ERP postimplementation is required to achieve ERP success. In this paper, risk management for ERP postimplementation is designed using COBIT 5 for Risk on APO12 processes. The design of a risk management framework begins with assessment of ERP postimplementation success adopting two approaches, namely the framework of ERP post-implementation success and Critical Success Factor of ERP post-implementation as an input to the risk identification adopted from COBIT 5 for Risk. ...

  10. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  11. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  12. Information for Participants Implementing Integrated Pest Management in Schools

    Science.gov (United States)

    Parents, school faculty and staff, school administrators, and pest management professionals all have important roles in planning and implementing school IPM. Find out about these roles and resources available to help.

  13. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  14. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    Science.gov (United States)

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  15. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  16. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  17. Strategic planning features of subsurface management in Kemerovo Oblast

    Science.gov (United States)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  18. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  19. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  20. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  1. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  2. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  3. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  4. Data management and processing plan, Department of Applied Geodesy

    International Nuclear Information System (INIS)

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL

  5. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  6. Care plans and care planning in the management of long-term conditions in the UK: a controlled prospective cohort study.

    Science.gov (United States)

    Reeves, David; Hann, Mark; Rick, Jo; Rowe, Kelly; Small, Nicola; Burt, Jenni; Roland, Martin; Protheroe, Joanne; Blakeman, Tom; Richardson, Gerry; Kennedy, Anne; Bower, Peter

    2014-09-01

    In the UK, the use of care planning and written care plans has been proposed to improve the management of long-term conditions, yet there is limited evidence concerning their uptake and benefits. To explore the implementation of care plans and care planning in the UK and associations with the process and outcome of care. A controlled prospective cohort study among two groups of patients with long-term conditions who were similar in demographic and clinical characteristics, but who were registered with general practices varying in their implementation of care plans and care planning. Implementation of care plans and care planning in general practice was assessed using the 2009-2010 GP Patient Survey, and relationships with patient outcomes (self-management and vitality) were examined using multilevel, mixed effects linear regression modelling. The study recruited 38 practices and 2439 patients. Practices in the two groups (high and low users of written documents) were similar in structural and population characteristics. Patients in the two groups of practices were similar in demographics and baseline health. Patients did demonstrate significant differences in reported experiences of care planning, although the differences were modest. Very few patients in the cohort reported a written plan that could be confirmed. Analysis of outcomes suggested that most patients show limited change over time in vitality and self-management. Variation in the use of care plans at the practice level was very limited and not related to patient outcomes over time. The use of written care plans in patients with long-term conditions is uncommon and unlikely to explain a substantive amount of variation in the process and outcome of care. More proactive efforts at implementation may be required to provide a rigorous test of the potential of care plans and care planning. © British Journal of General Practice 2014.

  7. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  8. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  9. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  10. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  11. Guidelines for evaluating software configuration management plans for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Kim, Jang Yeon

    2001-08-01

    Software configuration management (SCM) is the process for identifying software configuration items (CIs), controlling the implementation and changes to software, recording and reporting the status of changes, and verifying the completeness and correctness of the released software. SCM consists of two major aspects: planning and implementation. Effective SCM involves planning for how activities are to be performed, and performing these activities in accordance with the Plan. This report first reviews the background of SCM that include key standards, SCM disciplines, SCM basic functions, baselines, software entity, SCM process, the implementation of SCM, and the tools of SCM. In turn, the report provides the guidelines for evaluating the SCM Plan for digital I and C systems of nuclear power plants. Most of the guidelines in the report are based on IEEE Std 828 and ANSI/IEEE Std 1042. According to BTP-14, NUREG-0800, the evaluation topics on the SCM Plan is classified into three categories: management, implementation, and resource characteristics

  12. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  13. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    International Nuclear Information System (INIS)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.; Thieme, R.E.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a ''transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as ''buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containing mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs

  14. The implementation goals of geoinformation support to planning and spatial management at the local level in the framework of the ONIX project

    Directory of Open Access Journals (Sweden)

    Franc J. Zakrajšek

    1999-01-01

    Full Text Available The project objective is to strengthen the development, establishment, maintenance and use of the geographical data bases in the processes of physical planning and urban management on local level. It is a part of the Slovenian environmental project Onix. The current state is the phase of implementation.

  15. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  16. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  17. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  18. Tool to address green roof widespread implementation effect in flood characteristics for water management planning

    Directory of Open Access Journals (Sweden)

    R. Tassi

    2015-06-01

    Full Text Available In the last decades, new approaches were adopted to manage stormwater as close to its source as possible through technologies and devices that preserve and recreate natural landscape features. Green Roofs (GR are examples of these devices that are also incentivized by city's stormwater management plans. Several studies show that GR decreases on-site runoff from impervious surfaces, however, the analysis of the effect of widespread implementation of GR in the flood characteristics at the urban basin scale in subtropical areas are little discussed, mainly because of the absence of data. Thereby, this paper shows results related to the monitoring of an extensive modular GR under subtropical weather conditions, the development of a rainfall–runoff model based on the modified Curve Number (CN and SCS Triangular Unit Hydrograph (TUH methods and the analysis of large-scale impact of GR by modelling different basins. The model was calibrated against observed data and showed that GR absorbed almost all the smaller storms and reduced runoff even during the most intense rainfall. The overall CN was estimated in 83 (consistent with available literature with the shape of hydrographs well reproduced. Large-scale modelling (in basins ranging from 0.03 ha to several square kilometers showed that the widespread use of GRs reduced peak flows (volumes around 57% (48% at source and 38% (32% at the basin scale. Thus, this research validated a tool for the assessment of structural management measures (specifically GR to address changes in flood characteristics in the city's water management planning. From the application of this model it was concluded that even if the efficiency of GR decreases as the basin scale increase they still provide a good option to cope with urbanization impact.

  19. Greater Vancouver regional district air quality management plan : implementation status report

    International Nuclear Information System (INIS)

    2001-03-01

    In December 1994, an Air Quality Management Plan (AQMP) was adopted by the Greater Vancouver Regional District. The AQMP included ways to improve air quality in the region, leading to reduced emissions from commercial and industrial operations. This Plan encourages cooperation with the various communities affected to achieve clean air lifestyles and manage emissions from human activity to enhance human health and the integrity of the environment. The reduction of total emissions of the common air contaminants sulphur and nitrogen oxides, particulate matter, carbon monoxide and volatile organic compounds by 38 per cent is the stated aim of the AQMP. Five years of planning resulted in the formulation of the AQMP. The issues addressed were assigned one of four priorities as follows: priority 1 deals with ground level ozone and fine particulate, priority 2 looks at visibility, hazardous air pollutants, and global climate change, priority 3 concerns odour, carbon monoxide, sulphur dioxide, acidic deposition, and nitrogen dioxide, and priority 4 contains total suspended particulate matter and volatile organic compounds. A total of 54 Emission Reduction Measures were established, and the document reviewed them. Progress is being made in all areas. 2 tabs., 3 figs

  20. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  1. Implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Bullock, M.G.; Rodriguez, R.R.

    1987-05-01

    This document presents the current implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory. Information contained in this report was also included in several Department of Energy (DOE) planning documents for the Defense Transuranic Waste Program. This information can be found in the following DOE documents: Comprehensive Implementation Plan for the DOE Defense Buried TRU Waste Program; Defense Waste Management Plan for Buried Transuranic-Contaminated Waste, Transuranic-Contaminated Waste, Transuranic-Contaminated Soil, and Difficult-to-Certify Transuranic Waste; and Defense Special-Case Transuranic Waste Implementation Plan. 11 refs

  2. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  3. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  4. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  5. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  6. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  7. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  8. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  9. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  10. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC.

  11. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC

  12. A Strategic Plan for Introducing, Implementing, Managing, and Monitoring an Urban Extension Platform

    Science.gov (United States)

    Warner, Laura A.; Vavrina, Charlie S.; Campbell, Mary L.; Elliott, Monica L.; Northrop, Robert J.; Place, Nick T.

    2017-01-01

    Florida's Strategic Plan for Extension in Metropolitan Regions reflects an adaptive management approach to the state's urban Extension mission within the context of establishing essential elements, performance indicators, key outcomes, and suggested alternatives for action. Extension leadership has adopted the strategic plan, and implementation…

  13. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  14. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Science.gov (United States)

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  15. Implementing new product development: A study of personal characteristics among managers

    DEFF Research Database (Denmark)

    Jespersen, Kristina Risom; Bysted, Rune

    2016-01-01

    Strategy implementation is an important aspect of innovation, as only 30% of planned strategies are matched by realised innovation outcomes. The present study investigates this in a setting of strategic implementation of New Product Development (NPD). In the implementation process, the managers...... strategic intentions create information overload in the NPD process, which decreases the new product novelty. In contrast, realisation of defensive strategic intentions makes experienced NPD managers focus on known NPD competences, thereby decreasing the new product novelty of NPD efforts. The study...

  16. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  17. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  18. Clinical Implementation of an Online Adaptive Plan-of-the-Day Protocol for Nonrigid Motion Management in Locally Advanced Cervical Cancer IMRT

    Energy Technology Data Exchange (ETDEWEB)

    Heijkoop, Sabrina T., E-mail: s.heijkoop@erasmusmc.nl; Langerak, Thomas R.; Quint, Sandra; Bondar, Luiza; Mens, Jan Willem M.; Heijmen, Ben J.M.; Hoogeman, Mischa S.

    2014-11-01

    Purpose: To evaluate the clinical implementation of an online adaptive plan-of-the-day protocol for nonrigid target motion management in locally advanced cervical cancer intensity modulated radiation therapy (IMRT). Methods and Materials: Each of the 64 patients had four markers implanted in the vaginal fornix to verify the position of the cervix during treatment. Full and empty bladder computed tomography (CT) scans were acquired prior to treatment to build a bladder volume-dependent cervix-uterus motion model for establishment of the plan library. In the first phase of clinical implementation, the library consisted of one IMRT plan based on a single model-predicted internal target volume (mpITV), covering the target for the whole pretreatment observed bladder volume range, and a 3D conformal radiation therapy (3DCRT) motion-robust backup plan based on the same mpITV. The planning target volume (PTV) combined the ITV and nodal clinical target volume (CTV), expanded with a 1-cm margin. In the second phase, for patients showing >2.5-cm bladder-induced cervix-uterus motion during planning, two IMRT plans were constructed, based on mpITVs for empty-to-half-full and half-full-to-full bladder. In both phases, a daily cone beam CT (CBCT) scan was acquired to first position the patient based on bony anatomy and nodal targets and then select the appropriate plan. Daily post-treatment CBCT was used to verify plan selection. Results: Twenty-four and 40 patients were included in the first and second phase, respectively. In the second phase, 11 patients had two IMRT plans. Overall, an IMRT plan was used in 82.4% of fractions. The main reasons for selecting the motion-robust backup plan were uterus outside the PTV (27.5%) and markers outside their margin (21.3%). In patients with two IMRT plans, the half-full-to-full bladder plan was selected on average in 45% of the first 12 fractions, which was reduced to 35% in the last treatment fractions. Conclusions: The implemented

  19. 40 CFR 256.02 - Scope of the State solid waste management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.0...

  20. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  1. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  2. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    needed to evaluate the implementation of the plans and, in many cases, the impact of the process on the plan. Performance can be improved with the assistance of policy makers by further developing guidelines, harmonising payment schemes with the conservation measures of the plans and providing training on conflict resolution. The evaluation framework proved to be suitable for the assessment of a large set of conservation related management planning processes, but it also had some limitations, e.g. concerning the incorporation of stakeholders' views in the evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  4. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    existing circumstance or history, and ineffective planning instruments. Cooperation between involved actors is also largely absent in planning practice. Overall, urban planning and management in Shanghai could benefit from more recognition and monitoring of plan implementation which would lead to some reconsideration of the planning tools and processes to more effectively guide future urban development.

  5. Danish risk management plans of the EU Floods Directive

    Directory of Open Access Journals (Sweden)

    Jebens Martin

    2016-01-01

    Full Text Available We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision support systems, a need to define acceptable risks, and a need to enhance coordi-nation between municipal and cross-sectorial actors as well as an increased effort to involve civil society is necessary. In general, the implementation of the Directive has significantly advanced the national scientific and cross-sectorial working platform for dealing with risks from floods.

  6. Risk management for drinking water safety in low and middle income countries - cultural influences on water safety plan (WSP) implementation in urban water utilities.

    Science.gov (United States)

    Omar, Yahya Y; Parker, Alison; Smith, Jennifer A; Pollard, Simon J T

    2017-01-15

    We investigated cultural influences on the implementation of water safety plans (WSPs) using case studies from WSP pilots in India, Uganda and Jamaica. A comprehensive thematic analysis of semi-structured interviews (n=150 utility customers, n=32 WSP 'implementers' and n=9 WSP 'promoters'), field observations and related documents revealed 12 cultural themes, offered as 'enabling', 'limiting', or 'neutral', that influence WSP implementation in urban water utilities to varying extents. Aspects such as a 'deliver first, safety later' mind set; supply system knowledge management and storage practices; and non-compliance are deemed influential. Emergent themes of cultural influence (ET1 to ET12) are discussed by reference to the risk management, development studies and institutional culture literatures; by reference to their positive, negative or neutral influence on WSP implementation. The results have implications for the utility endorsement of WSPs, for the impact of organisational cultures on WSP implementation; for the scale-up of pilot studies; and they support repeated calls from practitioner communities for cultural attentiveness during WSP design. Findings on organisational cultures mirror those from utilities in higher income nations implementing WSPs - leadership, advocacy among promoters and customers (not just implementers) and purposeful knowledge management are critical to WSP success. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.

  7. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  8. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    International Nuclear Information System (INIS)

    McCormack, R.L.

    1997-01-01

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O'Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE's baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  9. MEDBASE: Strategic Planning and Implementation of an Army Medical Department Software Application

    Science.gov (United States)

    2003-07-17

    downtime procedures) Software/ hardware performance testing Contingency plans Celebration / people management Risk Zone 4 Planning for upgrades...goal to “Crush Adidas !” and Honda’s goal in 1970 to “destroy Yamaha!”. MEDBASE: Strategy and Implementation 57 (3) Role Model BHAGs suit up-and...Crush Adidas ! (Nike, 1960s) Yamaha so tsubusu! We will destroy Yamaha! (Honda, 1970s) Role-Model BHAGs suit up-and-coming organizations Become the

  10. Danish risk management plans of the EU Floods Directive

    DEFF Research Database (Denmark)

    Jebens, Martin; Sørensen, Carlo Sass; Piontkowitz, Thorsten

    2016-01-01

    We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed...... and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision...... and cross-sectorial working platform for dealing with risks from floods....

  11. Developing an Implementation Plan. The Administration of Career Education: Module 8.

    Science.gov (United States)

    Drier, Harry N., Jr., Ed.; Martinez, Nancy S., Ed.

    The module is one of a series of eight developed to provide inservice education training for administrators of career education programs. An examination of basic scientific planning approaches and procedures is presented to provide the administrator with a basic tool to implement career education. Various scientific management techniques and their…

  12. The strategy of the shelter implementation plan (SIP) performance

    International Nuclear Information System (INIS)

    Geras'ko, V.N.; Nosovskij, A.V.

    1999-01-01

    In 1997 the 'Shelter Implementation Plan' (SIP) was developed it's purpose was to transform Unit 4 of the Chernobyl NPP into the ecologically safe system. The Plan was developed by common efforts of the Ukrainian scientists, CES representatives and experts from the United States of America. The fact that there are no nuclear and radiation safety criteria for the projects will result into the situation when different designers might use within the various project tasks various design criteria. Till now o exact date for the constructions stabilization activities has been defined, and it creates a kind of on definiteness while developing the Radioactive Waste Management strategy and Safe Confinement

  13. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  14. Plant specific severe accident management - the implementation phase

    International Nuclear Information System (INIS)

    Prior, R.

    1999-01-01

    Many plants are in the process of developing on-site guidance for technical staff to respond to a severe accident situation severe accident management guidance (SAMG). Once the guidance is developed, the SAMG must be implemented at the plant site, and this involves addressing a number of additional aspects. In this paper, approaches to this implementation phase are reviewed, including review and verification of plant specific SAMG, organizational aspects and integration with the emergency plan, training of SAMG users, validation and self-assessment and SAMG maintenance. Examples draw on experience from assisting numerous plants to implement symptom based severe accident management guidelines based on the Westinghouse Owners Group approach, in Westinghouse, non-Westinghouse and VVER plant types. It is hoped that it will be of use to those plant operators about to perform these activities.(author)

  15. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  16. Factors that hinder community participation in developing and implementing comprehensive council health plans in Manyoni District, Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel G. Kilewo

    2015-06-01

    Full Text Available Background: Decentralization of public health planning is proposed to facilitate public participation in health issues. Health Sector Reform in Tanzania places emphasis on the participation of lower level health facilities and community in health planning process. Despite availability of policies, guidelines, and community representative organs, actual implementation of decentralization strategies is poorly achieved. This study intended to find out factors that hinder community participation in developing and implementing Comprehensive Council Health Plan (CCHP. Materials and methods: A qualitative approach was conducted in this study with key informants from Health Facility Governing Committees (HFGC, Council Health Service Board (CHSB, and Council Health Management Team (CHMT. Data were collected using in-depth interviews. Data generated were analyzed for themes and patterns. Results: Factors that hindered community participation included lack of awareness on the CCHP among HFGC members, poor communication and information sharing between CHMT and HFGC, unstipulated roles and responsibilities of HFGC, lack of management capacity among HFGC members, and lack of financial resources for implementing HFGC activities. Conclusions: The identified challenges call for policy makers to revisit the decentralization by devolution policy by ensuring that local governance structures have adequate resources as well as autonomy to participate in planning and managing CCHP in general and health facility plans in particular.

  17. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles

    Science.gov (United States)

    Horne, Avril C.; Szemis, Joanna M.; Webb, J. Angus; Kaur, Simranjit; Stewardson, Michael J.; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  18. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles.

    Science.gov (United States)

    Horne, Avril C; Szemis, Joanna M; Webb, J Angus; Kaur, Simranjit; Stewardson, Michael J; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  19. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  20. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  1. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  2. Computer-aided waste management strategic planning and analysis

    International Nuclear Information System (INIS)

    Avci, H.I.; Kotek, T.J.; Koebnick, B.L.

    1995-01-01

    A computational model called WASTE-MGMT has been developed to assist in the evaluation of alternative waste management approaches in a complex setting involving multiple sites, waste streams, and processing options. The model provides the quantities and characteristics of wastes processed at any facility or shipped between any two sites as well as environmental emissions at any facility within the waste management system. The model input is defined by three types of fundamental waste management data: (1) waste inventories and characteristics at the point of generation; (2) treatment, storage, and disposal facility characteristics; and (3) definitions of alternative management approaches. The model has been successfully used in the preparation of the US Department of Energy (DOE) Environmental Management Programmatic.Environmental Impact Statement (EM PEIS). Certain improvements are either being implemented or planned that would extend the usefulness and applicability of the WASTE-MGMT model beyond the EM PEIS and info the. strategic planning for management of wastes under the responsibility of DOE or other agencies

  3. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka Shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2007-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal and spent nuclear fuel assemblies; treatment/decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  4. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2008-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal of spent nuclear fuel assemblies; treatment/ decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  5. Automation through the PIP [Program Implementation Plan] concurrence system improves information sharing among DOE [Dept. of Energy] managers

    International Nuclear Information System (INIS)

    Imholz, R.M.; Berube, D.S.; Peterson, J.L.

    1990-01-01

    The Program Implementation Plan (PIP) Concurrence System is designed to improve information sharing within the U.S. Department of Energy (DOE) and between DOE and the Field. Effectively sharing information enables DOE managers to make more informed, effective decisions. The PIP Concurrence System improved information sharing among DOE managers by defining the automated process for concurring on a DOE document, thus reducing the time required to concur on the document by 75%. The first step in defining an automated process is to structure the process for concurring on a document. Only those DOE managers with approved access could review certain parts of a document on a concurrence system. Remember that the concurrence process is a sign off procedure unlike a commentary process in which comments may not be restricted to certain people. The commentary process is the beginning of the concurrence process. The commentary process builds a document; the concurrence process approves it. 6 refs., 7 figs

  6. Implementation Of Strategic Management

    African Journals Online (AJOL)

    Administrator

    Creativity and innovation is the new game plan inherent in strategic .... The diagram below is a simplified operational model of strategic management, ..... Bryson (1995) outlines four benefits of strategic (planning) Management in his ... champions, good strategic planning teams, enough slack to handle potentially disruptive.

  7. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  8. Pro-ACT II: integrating utilization management, discharge planning, and nursing case management into the outcomes manager role.

    Science.gov (United States)

    Brett, J L; Bueno, M; Royal, N; Kendall-Sengin, K

    1997-02-01

    Building on redesign efforts that created case management, clinical care technicians, support service hosts, and pharmacy technician roles, this redesign focused on integrating case management, utilization management, and discharge planning functions into a new outcomes manager role. The authors describe the process of developing and implementing the new role and outline specific actions that eliminated redundancy and inefficiency. Results of the evaluation of the project are reviewed, including full-time equivalent and salary savings and employee and physician satisfaction improvements.

  9. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  10. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  11. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  12. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  13. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    Science.gov (United States)

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Planning, Management and Organizational Aspects of the Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    2013-08-01

    Many old reactors and other nuclear facilities worldwide are being actively dismantled or are candidates for decommissioning in the near term. A significant number of these facilities are located in Member States having little experience or expertise in planning and implementing state of the art decommissioning projects. Planning, management and organization are critical for the success of such projects. The main objective of IAEA technical activities related to decommissioning is to promote the exchange of lessons learned, thereby contributing to successful planning and implementation of decommissioning projects. Imperative for success is a better understanding of the decision making process, the comparison and selection of decommissioning plans and organizational provisions, and relevant issues affecting the entire decommissioning process. Topics addressed in this publication include details on development of the decommissioning plan, structuring of key project tasks, organizing the project management team, identifying key staffing positions and determining required workforce skills, and managing the transition from an operational phase to the decommissioning phase. It is expected that this project, and in particular the papers collected in this publication, will draw Member States' attention to the practicality and achievability of timely planning and smooth management of decommissioning projects, especially for smaller projects. Concluding reports summarizing the work undertaken under the aegis of a coordinated research project (CRP) on planning, management and organizational aspects in the decommissioning of nuclear facilities, and presented at the third and final research coordination meeting (RCM) held in Da Lat, Vietnam, 5-9 September 2011, are included in this publication. Operating experience and lessons learned during full scale applications, as well as national programmes and plans, are among the most significant achievements of the CRP and have been

  15. Planning, Management and Organizational Aspects of the Decommissioning of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Many old reactors and other nuclear facilities worldwide are being actively dismantled or are candidates for decommissioning in the near term. A significant number of these facilities are located in Member States having little experience or expertise in planning and implementing state of the art decommissioning projects. Planning, management and organization are critical for the success of such projects. The main objective of IAEA technical activities related to decommissioning is to promote the exchange of lessons learned, thereby contributing to successful planning and implementation of decommissioning projects. Imperative for success is a better understanding of the decision making process, the comparison and selection of decommissioning plans and organizational provisions, and relevant issues affecting the entire decommissioning process. Topics addressed in this publication include details on development of the decommissioning plan, structuring of key project tasks, organizing the project management team, identifying key staffing positions and determining required workforce skills, and managing the transition from an operational phase to the decommissioning phase. It is expected that this project, and in particular the papers collected in this publication, will draw Member States' attention to the practicality and achievability of timely planning and smooth management of decommissioning projects, especially for smaller projects. Concluding reports summarizing the work undertaken under the aegis of a coordinated research project (CRP) on planning, management and organizational aspects in the decommissioning of nuclear facilities, and presented at the third and final research coordination meeting (RCM) held in Da Lat, Vietnam, 5-9 September 2011, are included in this publication. Operating experience and lessons learned during full scale applications, as well as national programmes and plans, are among the most significant achievements of the CRP and have been

  16. Strategy and Portfolio Management Aspects of Integrated Business Planning

    Directory of Open Access Journals (Sweden)

    Peter Jurečka

    2013-03-01

    Full Text Available With ongoing globalization and thereof derived growing competitiveness on most markets, companies are under constant pressure to increase the effectiveness and efficiencies of their operations. This article focuses on one of the core business management processes – on planning, namely on Sales and Operations Planning (S&OP and its latest development stage represented by the concept of Integrated Business Planning (IBP. It aims to extend the traditional concept of S&OP for selected topics from business strategy and portfolio management, which structured inclusion into planning represent one of key factors distinguishing IBP from conventional S&OP. Implementation of IBP, which constitutes significant step towards operational excellence, is applicable for almost all business and thus can be used broadly as effective tool for facing the challenges of economic and financial crisis.

  17. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-07-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9830-5] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional...

  18. Strategic Energy Management Plan For Fort Buchanan, Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Steven A.; Hunt, W. D.

    2001-10-31

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

  19. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  20. Institutional Issues in the Planning and Implementation of a Program to Dispose of High-Level Radioactive Wastes

    Science.gov (United States)

    1981-02-01

    environment including political and psychosociological variables, (2) implementation (2) H. Igor Ansoff , Roger P. Declerck and Robert L. Hayes, "From...Strategic Planning to Strategic Management" in From Strategic Planning to Strategic Management, edited by H. Igor Ansoff et al., John Wiley & Sons, 1976...Hanagement," in From Strategic Planning to Strategic Nanagement, edited by H. Igor Ansoff et al., Jon.𔃻 Wiley & Sons, 1976, p. 33. -44- is not willing to

  1. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  2. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  3. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  4. Local niche planning and its strategic implications for implementation of energy-efficient technology

    DEFF Research Database (Denmark)

    Quitzau, Maj-Britt; Hoffmann, Birgitte; Elle, Morten

    2012-01-01

    -management process for enabling transitions. The study outlines the proactive spatial planning of a Danish local authority in order to illustrate how the strategic work performed in this kind of local development project represents a special form of niche management that is able to create room for innovation...... such a gap between policy visions and their implementation in practice specific forms of strategic work is needed, according to new transformative ideas in spatial planning. The aim of this paper is to characterize the transformative capacities of this kind of strategic work at the spatial scale of the town...... in order to assess how such activities engage with sustainable transitions. The theoretical contribution of the paper is to compare strategic work performed in transformative forms of spatial planning with the strategic work intended in strategic niche management, which represent a change...

  5. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  6. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  7. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  8. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  9. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  10. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  11. Tank waste remediation system systems engineering management plan

    International Nuclear Information System (INIS)

    Peck, L.G.

    1998-01-01

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance

  12. Implementing Participatory Water Management: Recent Advances in Theory, Practice, and Evaluation

    Directory of Open Access Journals (Sweden)

    Yorck von Korff

    2012-03-01

    Full Text Available Many current water planning and management problems are riddled with high levels of complexity, uncertainty, and conflict, so-called "messes" or "wicked problems." The realization that there is a need to consider a wide variety of values, knowledge, and perspectives in a collaborative decision making process has led to a multitude of new methods and processes being proposed to aid water planning and management, which include participatory forms of modeling, planning, and decision aiding processes. However, despite extensive scientific discussions, scholars have largely been unable to provide satisfactory responses to two pivotal questions: (1 What are the benefits of using participatory approaches?; (2 How exactly should these approaches be implemented in complex social-ecological settings to realize these potential benefits? In the study of developing social-ecological system sustainability, the first two questions lead to a third one that extends beyond the one-time application of participatory approaches for water management: (3 How can participatory approaches be most appropriately used to encourage transition to more sustainable ecological, social, and political regimes in different cultural and spatial contexts? The answer to this question is equally open. This special feature on participatory water management attempts to propose responses to these three questions by outlining recent advances in theory, practice, and evaluation related to the implementation of participatory water management. The feature is largely based on an extensive range of case studies that have been implemented and analyzed by cross-disciplinary research teams in collaboration with practitioners, and in a number of cases in close cooperation with policy makers and other interested parties such as farmers, fishermen, environmentalists, and the wider public.

  13. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Ravindra [Argonne National Lab. (ANL), Argonne, IL (United States); Reilly, James T. [Reilly Associates, Pittston, PA (United States); Wang, Jianhui [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-03-01

    Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

  14. Data Management and Preservation Planning for Big Science

    Directory of Open Access Journals (Sweden)

    Juan Bicarregui

    2013-06-01

    Full Text Available ‘Big Science’ - that is, science which involves large collaborations with dedicated facilities, and involving large data volumes and multinational investments – is often seen as different when it comes to data management and preservation planning. Big Science handles its data differently from other disciplines and has data management problems that are qualitatively different from other disciplines. In part, these differences arise from the quantities of data involved, but possibly more importantly from the cultural, organisational and technical distinctiveness of these academic cultures. Consequently, the data management systems are typically and rationally bespoke, but this means that the planning for data management and preservation (DMP must also be bespoke.These differences are such that ‘just read and implement the OAIS specification’ is reasonable Data Management and Preservation (DMP advice, but this bald prescription can and should be usefully supported by a methodological ‘toolkit’, including overviews, case-studies and costing models to provide guidance on developing best practice in DMP policy and infrastructure for these projects, as well as considering OAIS validation, audit and cost modelling.In this paper, we build on previous work with the LIGO collaboration to consider the role of DMP planning within these big science scenarios, and discuss how to apply current best practice. We discuss the result of the MaRDI-Gross project (Managing Research Data Infrastructures – Big Science, which has been developing a toolkit to provide guidelines on the application of best practice in DMP planning within big science projects. This is targeted primarily at projects’ engineering managers, but intending also to help funders collaborate on DMP plans which satisfy the requirements imposed on them.

  15. Integrating Personalized and Community Services for Mobile Travel Planning and Management

    Science.gov (United States)

    Yu, Chien-Chih

    Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.

  16. Investigating Effects of Participatory Range Management Plans on Species Diversity in Semirum-Isfahan Province

    Directory of Open Access Journals (Sweden)

    M. Borhani

    2016-05-01

    Full Text Available In order to investigate the effects of range management plans on species diversity, richness and evenness in Semirum rangelands, 52 sites (28 with treated plan and 24 without treated plan were selected. The non-parametric indices for species richness (Margalof, Menhinick, Jacknife and counting method and species diversity (Simpson, Camargo, Smith and Wilson and modified Nee were compared in two management plans. The mean comparisons were made by independent T Student Test and Mann-Witheny U Test, and correlation was determined between diversity indices and vegetation parameters. Based on the results there was no significant difference between the two management systems regarding environmental features, while the implementation of range management plans caused significant reduction of stocking rate. Among the studied indices, evenness of species in sites without treated plan was significantly more than the sites with treated plan. The correlation matrix showed that there was a significant positive correlation between species richness and vegetation cover, production of perennial plans, and the rangeland condition and trend, while evenness showed significant negative correlation with these indices. Generally, implementation of range management plans has considerable effect on increasing climax species, dominance of Bromus tomentellus and it causes improvement of rangeland condition and reduction of evenness. This behavior could be explained by the balance between species competition and grazing pressure. Further, succession process of the studied communities demonstrates domination of some desirable species, high production and less diversity.

  17. Is population flow an unintended consequence of alcohol management plans?

    Science.gov (United States)

    Usher, Kim; Woods, Cindy; Lynch, Paul; Pointing, Shane Boris; Budden, Lea; Barker, Ruth; Catchpoole, Jesani; Clough, Alan

    2017-03-01

    The aim of this study was to gauge whether, and to what extent, population flow occurred as a result of the implementation of alcohol management plans in Indigenous communities. Alcohol management plans involving carriage limits and dry places were introduced into 15 Queensland Indigenous communities between 2002-2004. Controls on alcohol availability were further tightened between 2008-2010, seeing the closure of eight mainly remote community taverns/canteens. A retrospective observational study was undertaken using data from the Queensland Injury Surveillance Unit. Population flow was measured by changing patterns of alcohol-related injuries in a mining region near dry Indigenous communities following the introduction of alcohol management plans and a control mining region distant from Indigenous communities with alcohol management plans. Data were analysed using descriptive and inferential statistics. Logistic regression was used for the comparison of the characteristics between the emergency department presentations. The rates of alcohol-related injury presentations per 1000/population were calculated and age-standardised to the Australian population. Between the five-year periods 2003-2007 and 2008-2012, alcohol-related injury presentations to the Mount Isa emergency department trebled from an age-adjusted average annual rate of 9·5/1000 in the region's population to 27·1/1000 population. In the control region, alcohol-related emergency department injury presentations did not increase to the same degree with age-adjusted average annual rates of 1·42/1000 and 2·21/1000, respectively. The 10-year pattern of emergency department presentations for alcohol-related injuries increased significantly in the Mount Isa region compared with the control region. Further research should investigate the impacts of population flow related to Indigenous community alcohol management plans. Although initiatives such as alcohol management plans have been implemented to reduce

  18. Business continuity and disaster management within the public service in relation to a national development plan.

    Science.gov (United States)

    Ferguson, Cliff

    2018-01-01

    Within South Africa, few public service departments understand the concepts of business continuity management (BCM) and what it takes to implement a well-constructed business continuity plan. Likewise, few of these entities understand the purpose of designing and maintaining resilient systems that are immune to incidents. This paper discusses the integration of the South African Disaster Management Act 2002, the Disaster Management Framework and the National Development Plan, linking these to BCM, through a resilience period model, as a means for the implementation of resilience strategies. The goals of the National Development Plan are outlined with a view to how resilience can be achieved in each. A resilience period model has been advocated for the implementation of projects within the public sector in order to provide continuity and sustainability.

  19. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    Science.gov (United States)

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B.; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-01-01

    Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the units. Future

  20. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    Directory of Open Access Journals (Sweden)

    Malin Tistad

    2016-08-01

    Full Text Available Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs, yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a fourmonth leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the

  1. Strategic Aspects of Nuclear and Radiological Emergency Management. Planning for Effective Decision Making; Consequence Management and Transition to Recovery

    International Nuclear Information System (INIS)

    2010-01-01

    The collective experience of the NEA Working Party on Nuclear Emergency Matters (WPNEM), and in particular, the experience from the International Nuclear Emergency Exercise (INEX) series, has shown that it is important to plan and to implement emergency response actions based on a guiding strategic vision. Within this context, Strategic Aspects of Nuclear and Radiological Emergency Management presents a framework of strategic planning elements to be considered by national emergency management authorities when establishing or enhancing processes for decision making, and when developing or implementing protection strategies. The focus is on nuclear or radiological emergency situations leading to complex preparedness and response conditions, involving multiple jurisdictions and significant international interfaces. The report is aimed at national emergency management authorities, international organisations and those who are seeking to improve the effectiveness of emergency management. Its goal is to provide insights into decision-making processes within existing emergency planning arrangements. It also highlights common areas of good practice in decision making. Specific areas for improvement, identified during the INEX-3 consequence management exercise, are included, particularly in support of decision making for countermeasures for consequence management and the transition to recovery. (authors)

  2. Innovative solutions: sample financial management business plan: neurosurgical intensive care unit.

    Science.gov (United States)

    Villanueva-Baldonado, Analiza; Barrett-Sheridan, Shirley E

    2010-01-01

    This article describes one institution's intention to implement a financial management business plan for a neurosurgical intensive care unit in a level I trauma center. The financial objective of this proposed business plan includes a service increase in the patient population requiring critical care in a way that will help control costs.

  3. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  4. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  5. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  6. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS's program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives

  7. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  8. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  9. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  10. Work management administration FY 1995 site support program plan WBS 6.2

    Energy Technology Data Exchange (ETDEWEB)

    Hale, N.S.

    1994-09-01

    Westinghouse Hanford Company`s (WHC) near-term vision is to implement a Site-wide work management program that is consistent from one facility to the other, and can realize workforce efficiencies, minimum down time, and familiarization with facilities uniqueness. Additionally, consistent Hanford Site work management processes can produce meaningful information to be shared complex-wide as the US Department of Energy (DOE) cleans up facilities Site-wide. It is the mission of the WHC Work Management Administration Program to provide guidance and program direction on how to implement consistent and effective work management across the Hanford Site that comply with the DOE and other regulatory requirements. This report describes the steps needed to implement a work management plan at Hanford.

  11. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9901-58-Region 9] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional Haze...

  12. Planning and Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Grance Torales, V.L.; Lira, L.

    2016-01-01

    Full text: The present case aims to share the experience of the Intellectual Capital Section (ICS), part of Planning, Coordination and Control Department of the Argentine Atomic Energy Commission (CNEA) in its search for a sustainable knowledge management. Among the strategic objectives included in CNEA’s Strategic Plan (SP), is the development, preservation and transference of knowledge and experience. Under this framework, the role initially assumed by the ICS, consisted on the observation and diagnosis of the situation of the Institutional Human Capital (HC), through the study of the main characteristics of the staff of CNEA. The second stage of SP (2015–2025), which consisted of updating the HC data, the incorporation of the concept of “knowledge management” was approved by the authorities of the Institution. Based on this background, in 2016 the objectives of the ICS are aimed at organizing and coordinating a network of knowledge management that involves the entire organization. This new phase implies, among other things, the proposal of a knowledge management policy, interaction with other sectors of CNEA for implementation, analysis of the tools to be used, in order to determine a way and work style that suits the culture and structure of the organization. (author

  13. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  14. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    International Nuclear Information System (INIS)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP

  15. Merging Methods to Manage Uncertainty: Combining Simulation Modeling and Scenario Planning to Inform Resource Management Under Climate Change

    Science.gov (United States)

    Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.

    2017-12-01

    Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the

  16. Interagency Communication and Collaboration on School Crisis Response Planning and Management

    Science.gov (United States)

    Skavdahl, Britta M.

    2010-01-01

    Purpose. The purpose of this study was to determine what research-based and federally recommended practices in the area of school crisis response planning and management were being implemented in K-8 school districts in Northern California, as well as the degree with which the recommended practices were being implemented. Finally, the study…

  17. Metro manila transport and traffic management plan (1993-1998)

    Energy Technology Data Exchange (ETDEWEB)

    Cal, P.C.

    1995-12-31

    In 1988, former President Corazon Aquino created the Presidential Task Force on Traffic Management to formulate plans and programs to improve the traffic situation in Metro Manila and to address the emerging problem of air pollution and concern on renewable energy sources for transportation. The Task Force formulated the Metro Manila Traffic Improvement Plan (TRIP) which was approved by President Aquino for implementation. TRIP called for the development of a mass urban transport system, which included the expansion of the light rail transit system and the construction and improvement of the Metro Manila road network. Culled mainly from the TRIP proposals, the Updated Transport and Traffic Management Plan for Metro Manila (1993-1998) was developed through interagency discussions, public consultations, data collation and research work. This plan is directed towards the development of a more responsive public transport system, expansion of road network capacity, and improvement of traffic management and enforcement. Constraints may be present along the way but opportunities and potentials exist for the deliverance of daily commuters struggling to make a living.

  18. Implementation of a Document Management System in an Operating Nuclear Power Plan

    International Nuclear Information System (INIS)

    Martinez Ladron de Guevara, J.

    1996-01-01

    The difficulty of implementing a document management system in an operating nuclear power plant basically lies in the high volume of information to be handled, in the different storage devices used and in the complexity of relations existing between the documentation and the physical elements of the facility. The documentation used in a power plant, mainly technical, is often stored on different devices (paper, microfilm, aperture cards, test files, vector files, raster files, etc) and usually features various identification criteria (engineering, manufacturing, plant staff, etc). Consequently, the system must be aimed at the management of multiformatted documentation, providing appropriate means of identification, capture and display for each case. The document management system must satisfy all information needs of each department of the plant, and should be adapted to the work cycles of the plant. Moreover, it should be integrated into other computer application in operation (maintenance, operation, procurement, etc), so that links can be established between the documentation and configuration elements. Although this is a complex procedure in operating power plants, there are integrating tools that facilitate the gradual implementation of this type of system. (Author)

  19. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  20. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  1. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  2. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  3. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  4. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  5. The development and implementation of a waste management strategy

    International Nuclear Information System (INIS)

    Fairhall, G.A.; Vickery, P.; Edmiston, L.

    1999-01-01

    Over the past forty years BNFL has operated 4 nuclear sites in the UK. Commercial operations on these sites span the full nuclear fuel cycle from enrichment, fuel fabrication, electricity generation, reprocessing, waste management, and decommissioning. Through the recent merger with Magnox Electric BNFL has acquired a further 8 Magnox reactor sites in the UK. Prior to 1980 BNFL adopted a policy of storing wastes generated by its activities in an unconditioned state in purpose built stores. This paper shows how BNFL's waste management strategy has developed to ensure how volume reduction technologies have been implemented for low level waste. Whilst immobilisation technologies have been implemented for high and intermediate level wastes. The paper describes how continual review of the strategy ensures waste management processes are continually monitored against progress and optimised to ensure all waste arisings are conditioned for final disposal. Finally the paper will show how the strategy can be used to develop waste management plans for customer sites. (author)

  6. [Ethical principles of management and planning during influenza pandemic].

    Science.gov (United States)

    Kubar', O I; Asatrian, A Zh

    2012-01-01

    The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.

  7. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  8. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  9. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Towards a resilience management framework for complex enterprise systems upgrade implementation

    Science.gov (United States)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  11. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  12. THE PLANNING, PROGRAMING, BUDGETING SYSTEM AND ITS IMPLEMENTATION IN THE SERBIAN MINISTRY OF DEFENSE

    Directory of Open Access Journals (Sweden)

    Sasa RADUSKI

    2010-01-01

    Full Text Available The main purpose of introducing the PPBES to the Serbian Ministry of Defense and the Serbian Armed Forces is to provide a rational management of resources and to maintain and build capacity of the Ministry and the Serbian Armed Forces in order to achieve their goals, objectives and missions.Expected results of implementation of the PPBES are reflected in increasing the efficiency and rationalization of the defense planning to a higher level, ensuring compatibility with defense planning and budgeting system of the state and developing a foundation for the effective management of defense resources.

  13. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  14. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  15. Z-Plant material information tracking system (ZMITS) software development and integration project management plan

    International Nuclear Information System (INIS)

    IBSEN, T.G.

    1999-01-01

    This document plans for software and interface development governing the implementation of ZMITS and other supporting systems necessary to manage information for material stabilization needs of the Project Hanford Management Contract (PHMC)

  16. Planning and management of logistic cycle

    OpenAIRE

    V. N. Kudashkin

    2017-01-01

    We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as ...

  17. Comparison of provider and plan-based targeting strategies for disease management.

    Science.gov (United States)

    Annis, Ann M; Holtrop, Jodi Summers; Tao, Min; Chang, Hsiu-Ching; Luo, Zhehui

    2015-05-01

    We aimed to describe and contrast the targeting methods and engagement outcomes for health plan-delivered disease management with those of a provider-delivered care management program. Health plan epidemiologists partnered with university health services researchers to conduct a quasi-experimental, mixed-methods study of a 2-year pilot. We used semi-structured interviews to assess the characteristics of program-targeting strategies, and calculated target and engagement rates from clinical encounter data. Five physician organizations (POs) with 51 participating practices implemented care management. Health plan member lists were sent monthly to the practices to accept patients, and then the practices sent back data reports regarding targeting and engagement in care management. Among patients accepted by the POs, we compared those who were targeted and engaged by POs with those who met health plan targeting criteria. The health plan's targeting process combined claims algorithms and employer group preferences to identify candidates for disease management; on the other hand, several different factors influenced PO practices' targeting approaches, including clinical and personal knowledge of the patients, health assessment information, and availability of disease-relevant programs. Practices targeted a higher percentage of patients for care management than the health plan (38% vs 16%), where only 7% of these patients met the targeting criteria of both. Practices engaged a higher percentage of their targeted patients than the health plan (50% vs 13%). The health plan's claims-driven targeting approach and the clinically based strategies of practices both provide advantages; an optimal model may be to combine the strengths of each approach to maximize benefits in care management.

  18. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  19. Waste generator services implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  20. Waste generator services implementation plan

    International Nuclear Information System (INIS)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999

  1. Caribou conservation and recovery in Ontario: development and implementation of the Caribou Conservation Plan

    Directory of Open Access Journals (Sweden)

    Ted (E.R. Armstrong

    2012-03-01

    Full Text Available The range of Ontario’s woodland caribou (Rangifer tarandus caribou (forest-dwelling ecotype has receded northward substantially over many decades, leading to its current Threatened designation. Ontario released its Caribou Conservation Plan (CCP in the fall of 2009. This policy responded to public input and recommendations from the Ontario Woodland Caribou Recovery Team and the Caribou Science Review Panel, and outlines conservation and recovery actions to conserve and recover caribou. Within an adaptive management framework, the CCP builds upon a recent history of managing at large landscape scales in Ontario to implement a range management approach as the basis for recovery actions. These commitments and actions include enhanced research and monitoring, improved caribou habitat planning at the landscape scale, an integrated range analysis approach using advanced assessment tools to evaluate thresholds of habitat amount, arrangement and disturbance, the assessment of probability of persistence, consideration of cumulative effects, meeting forest management silvicultural performance requirements, consideration of caribou recovery implications when managing other wildlife, an initial focus on the southern edge of caribou distribution where threats are most significant, improved outreach and stewardship, and consideration of Aboriginal Traditional Knowledge in recovery actions. Implementation of the CCP signifies a long-term provincial commitment to caribou recovery, initially focusing on identified priorities within the CCP.

  2. A strategic approach for Water Safety Plans implementation in Portugal.

    Science.gov (United States)

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  3. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  4. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  5. Planning principles as integral tool of financial planning implementation at enterprise

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2016-09-01

    Full Text Available The main problems of using financial planning tools, namely its principles, in order to achieve an effective system of financial planning at the enterprise are considered. Planning is an integral part of management and provides achievement of sustainable enterprise development, that is why, effective financial planning is the necessary means of realization of the main objective of the company – profit maximization. It is determined that the principles of financial planning are the objective category of planning science, which serves as a starting fundamental concept that expresses the cumulative effect of a number of laws. In addition, on the base of the aggregation and analysis of planning principles the system of financial planning principles is specified, providing efficient financial planning and control functions use, achievement of the mission and objectives of the economic entity activity management and ensuring of its profitability. The scientific novelty of the research lies in the specification of financial planning principles defining at the enterprise and their semantic characteristics

  6. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  7. Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling

    Science.gov (United States)

    Fryling, Meg

    2010-11-01

    Organisations often make implementation decisions with little consideration for the maintenance phase of an enterprise resource planning (ERP) system, resulting in significant recurring maintenance costs. Poor cost estimations are likely related to the lack of an appropriate framework for enterprise-wide pre-packaged software maintenance, which requires an ongoing relationship with the software vendor (Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4), 42-46). The end result is that critical project decisions are made with little empirical data, resulting in substantial long-term cost impacts. The product of this research is a formal dynamic simulation model that enables theory testing, scenario exploration and policy analysis. The simulation model ERPMAINT1 was developed by combining and extending existing frameworks in several research domains, and by incorporating quantitative and qualitative case study data. The ERPMAINT1 model evaluates tradeoffs between different ERP project management decisions and their impact on post-implementation total cost of ownership (TCO). Through model simulations a variety of dynamic insights were revealed that could assist ERP project managers. Major findings from the simulation show that upfront investments in mentoring and system exposure translate to long-term cost savings. The findings also indicate that in addition to customisations, add-ons have a significant impact on TCO.

  8. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  9. Asthma Management in Educational Settings: Implementing Guideline-Based Care in Washington State Schools.

    Science.gov (United States)

    Evans-Agnew, Robin A; Klein, Nicole; Lecce, Sally

    2015-11-01

    Managing asthma in the schools is complex and requires careful planning. This article highlights key steps in implementing guideline-based care for children with asthma in Washington State schools: assessing students, establishing acuity, communicating with parents, and training staff. Advance planning can improve outcomes for students, parents, and school staff in managing this complex and prevalent disease. NASN recently developed asthma management guidelines. Developing state-specific guidelines provides an opportunity to speak specifically to state laws and nurse practice acts while also reinforcing the importance of specialized practice to school nurses, school administrators and teachers, parents, and students. © 2015 The Author(s).

  10. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  11. Education Projects: Elaboration, Financing and Management. Fundamentals of Educational Planning, No. 38.

    Science.gov (United States)

    Magnen, Andre

    In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…

  12. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  13. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Science.gov (United States)

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  14. Change Management Perspectives in an ERP Module Implementation: A Case Study in a Telecommunication Company

    Directory of Open Access Journals (Sweden)

    Tota Simatupang

    2016-06-01

    Full Text Available Successful Enterprise Resource Planning (ERP projects require change management to support the integration of the ERP systems into work environment because ERP imple¬men¬tations involve lots of changes on technical infrastructures, business processes, organization structure, rules and skills of people in the organization. This study was aimed to explain the challenges in implementing an ERP module in a Indonesian telecommunication company, focusing on the change management process involves in the project. A case study at a tele¬com¬munication company was used to collect empirical data and to analyses important aspects of project arrangements that will have an impact on the change management process accompanying the ERP implementation project. The following two aspects of changes were analyzed as the impact of ERP implementation: changes in individual behaviors and changes in the organisational practices. Based on the empirical study, two important aspects of change management effectiveness in the project and post-project stage were highlighted: alignment of the organization structure to support IT-business collaboration and alignment of employee orientation towards effective use of ERP systems. Besides, this study also highlighted that it is important to plan and execute change management process in the post-project stage to obtain benefits from ERP implementation.

  15. Leadership in Real Time : A Model of Attributes Needed by a Project Manager in ERP Implementations

    OpenAIRE

    Gunson, John; De Blasis, Jean-Paul; Neary, Mary

    2003-01-01

    The characteristics and organizational impacts of an Enterprise Resource Planning (ERP) Implementation Project requires highly professional Project Manager skills and attributes. Some may be learned or bought but the more important skills need to be part of the Project Manager's personal makeup. Coaching, mentoring and leadership skills (and beyond) help the Project Manager to take right decisions as even unknown-unknown situations arise during the implementation. This paper contributes to id...

  16. THE PREMISES OF STRATEGIC MARKETING PLANNING IMPLEMENTATION WITHIN SMALL AND MEDIUM SIZED ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Popescu Andrei

    2011-07-01

    Full Text Available The main purpose of the present paper is to identify the framework and the necessary conditions for the small and medium sized enterprises (SMEs to be able to adopt the strategic marketing planning. Also, the paper aims to underline the importance of the strategic marketing planning and the manner in which the SMEs can adopt, implement and operationalize the strategic marketing planning instruments, whose correct understanding and usage ensure the capacity to generate competitive advantage, the key element both from the perspective of the fierce competition and the perspective of the future development of the SMEs. Within SMEs the implementation of marketing becomes an evident requirment, mostly due to the relationship that these have with the market, thus, leading towards market orientation of the activities, a new approach developed by the marketing vision on managing the activities from these types of organizations. Regarded upon, from the marketing perspective, the activities from the SMEs, especially the marketing activities, cannot take place randomly. Resource allocation, a characteristic of these types of organizations, and the objectives with regards to superior customer needs satisfaction and economic efficiency maximization, claim thorough plannification and deployment of the activities in a sequence that represents the implementation of a strategy previously assumed. Within this framework, the strategic marketing planning appears as a complex process employing all scientific instruments that comprise segmentation, positioning and marketing mix. Utilizing the strategic marketing planning within SMEs depends to further extend on marketing integration; process directly related with a series of factors such as the nature of the market, development stage, product type, management quality and the influences of the marketing department of the SME. The implications onto the marketing activities from SMEs are reflected upon each strategic

  17. THE SIGNIFICANCE OF MANAGEMENT INFORMATION SYSTEMS FOR ENHANCING STRATEGIC AND TACTICAL PLANNING

    Directory of Open Access Journals (Sweden)

    Akram Jalal Karim

    2011-08-01

    Full Text Available Management Information Systems (MIS is the key factor to facilitate and attain efficient decision making in an organization. This research explores the extent to which management information systems implemented to make successful decisions at two selected financial organizations. The research examined whether the selected financial institutions of Bahrain vary as to the use of Management Information Systems leadership of decision making for strategic and tactical planning purposes. The research adapted the quantitative research design to examine two research hypotheses. A total of 190 forms were equally distributed to those who are working at different management levels at the selected organizations. The results of the research showed that MIS was primarily used to enhance strategic planning in both financial institutions. The regression analysis revealed that Tactical planning is found to have no effect on Decision Making, while Strategic planning has a clear effect on the Decision Making Effectiveness in both organizations

  18. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital.

    Science.gov (United States)

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiasvand, Hesam

    2015-07-27

    A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders' satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be attributed to the implementation of such systems. As a result, hospitals

  19. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  20. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  1. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  2. Evaluation of the Strategy Management Implementation in Project- Oriented Service Organizations

    Directory of Open Access Journals (Sweden)

    Abolfazl Sherafat

    2014-02-01

    Full Text Available Although developing strategic and operational plans is a difficult and complicated process, their successful implementation is much more difficult. Many organizations fail in the full implementation of their strategies. This is not due to the partial definition of strategies and organization‘s operational plan, but this is likely due to the lack of strong framework for creating alignment between employees and operational process and the organizational goals. To implement strategies effectively and to develop a comprehensive management system and to improve the performance, Robert Kaplan and David Norton introduced a modern management system which is Balanced ScoreCard. Likewise they introduced five main criteria: leadership, translation, alignment, every day process and ongoing process for a strategy oriented organization. This paper is intended to offer a systematic approach for measuring the effectiveness and efficiency of the strategic plan performance. For this study the questionnaire was distributed in a project- orientated service organization and after collection, by the use of statistical. Analysis especially factor analysis the grouping of sub-criteria under the five main criteria was confirmed. The statistical analysis showed that, two criteria of alignment and every day work had the lowest scores in terms of both implementation and effectiveness in the organization‘s senior and executive manager‘s point of view. With deep interview, studying of scorecards and meeting of the strategic committee of the studied organization, the two dimension of alignment and every day work were further examined and after identifying upgradeable areas, some suggestions for improving the effectiveness and efficiency of the studied organization were presented.

  3. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    Science.gov (United States)

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  4. Planning, managing and organizing the decommissioning of nuclear facilities: Lessons learned

    International Nuclear Information System (INIS)

    2004-05-01

    This publication is intended to encourage the development and improvement of decommissioning planning and management techniques, with the focus on organizational aspects, reduce the duplication of efforts by different parties by transfer of experience and know-how, and provide useful results for those Member States planning or implementing decommissioning projects. In general it can be stated that any decommissioning project can be completed without any deleterious effects on the safety of the workforce and the public or any identifiable impact on the environment. However, timeliness and cost-effectiveness are not always optimal. It has been noted on several occasions that the major weakness in decommissioning projects (as well as in other industrial projects) is often not the lack of technologies, but rather poor planning and management. This publication intends to stimulate awareness of the need for early and efficient planning and to foster developments in management and organization in association with planned or ongoing decommissioning projects. A companion report on Organization and Management for Decommissioning of Large Nuclear Facilities was published by the IAEA in 2000 (Technical Report Series (TRS) No. 399). That TRS provides generic guidance on organizational and management aspects. This TECDOC is complementary to the existing report in that it highlights practical experience - in particular, typical issues, evidence of poor management, undue delays, and lack of timely funding - and distils lessons learned from this experience

  5. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  6. An Implentation Methodology for Integrated Resource Management in Urban Water Planning

    Science.gov (United States)

    Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.

    2014-12-01

    Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.

  7. LABCORE post release 1.0 development system project management plan

    International Nuclear Information System (INIS)

    Rich, H.S.

    1994-01-01

    The LABCORE post release 1.0 development system project management plan (SPMP) is the primary planning document governing the development of specific enhancements to the LABCORE project. The mission of the Westinghouse Hanford Company (WHC) laboratories is changing from supporting the 200 Area chemical processing plants for process control, waste management, and effluent monitoring to supporting environmental restoration and regulatory compliance commitments. The LABCORE program was implemented as the key element for meeting the commitments by upgrading the laboratories through the implementation of an Automated Data Processing improvement program in January 1994. Scope for LABCORE release 1.0 consisted of hardware and software implementation required to support a minimum number of analyses (Single-Shell Tank [SST] analysis at 222S Laboratory and Performance Evaluation samples at the Waste Sampling Characterization Facility laboratory) using manual entry of data, and to support routine laboratory functions, common to all laboratories. LABCORE post release 1.0 enhancements will expand the functionality presented to the laboratory. Post release 1.0 enhancements will also address the integration of a database for Analytical Services Program Integration, budgeting, and scheduling offices into LABCORE

  8. Using technology for bed management in public hospitals - A strategic analysis and change management plan

    OpenAIRE

    Brayan, Daniel Joseph

    2005-01-01

    As healthcare organisations in New South Wales, Australia, are facing the increased demands of an aging population, new approaches to improving access to services are being sought. This project explores the potential of applying information technology to the management of beds in a large Sydney public hospital. More specifically, this project addresses the cultural and organizational aspects of hospital environments and factors them into a change management plan for implementing bed managemen...

  9. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  10. Savannah River Site FY 2001 Spent Nuclear Fuel Integrated Management Plan

    International Nuclear Information System (INIS)

    Dunsmuir, M.D.

    2000-01-01

    This document presents the SRS integrated near and long-term plans (FY 2001 through 2035) for the safe life cycle management of SNF inventories and other SFSD legacy material programs/projects that impact this mission until final disposition has been implemented

  11. Designing and implementing a geographical information system: A guide for managers of area-wide pest management programmes

    International Nuclear Information System (INIS)

    2006-04-01

    Over the past two decades, the use of computer software and mapping methods known as geographical information systems (GIS) has been adopted by an ever growing variety of professionals. Every activity that deals with location dependent information can use GIS, and agriculture is no exception. The potential of GIS and remote sensing (RS) to facilitate the planning and implementation of areawide integrated pest management (AW-IPM) programmes is enormous but unfortunately, these methods are still much underused. AW-IPM programmes, especially those that integrate the sterile insect technique (SIT) with other surveillance and control methods, would benefit considerably by drawing on GIS/RS. These programmes are often implemented over large areas of even tens of thousands of square kilometres, where surveillance methods are deployed and large data sets are systematically generated on a daily basis. The acquisition of geo-referenced data sets on pest presence/absence, relative abundance, disease prevalence, crop damage, etc., that will allow accurate spatial and temporal analysis is important for proper and timely decision making to efficiently plan and implement any operational pest management programme. Animal health and plant protection officials and pest control programme managers might be intuitively aware of the importance of employing GIS as an analytical tool. However, they often lack a deeper understanding of its capabilities. Since GIS is a desk exercise using computers, data analysis is often left to the computer staff without proper directives from the programme managers on programmatic needs. This is unfortunate as it will usually NOT bring the desired GIS-processed information to the decision makers. This manual targets area-wide pest control programme administrators and managers of FAO and IAEA Member States in an attempt to demonstrate the type of data processing and spatial analysis that can be expected of GIS. The manual does not aim to provide

  12. Implementation Of Quality Management System For Irradiation Processing Services

    Science.gov (United States)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  13. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  14. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  15. Implementation of Participatory Forest Management in Kenya

    DEFF Research Database (Denmark)

    Thygesen, S. H.; Løber, Trine; Skensved, E.M.

    2016-01-01

    This paper analyzes the distribution of powers before and after the implementation of participatory forest management (PFM) in Kenya. The paper is a case study of the Karima forest in the Central Highlands of Kenya. The study relies primarily on 34 semi-structured interviews with key actors...... of the forest communities and weak downward accountability relations. Finally, it illustrates a planning process, which has weaknesses in participation and inclusiveness. Consequently, the paper suggests three areas for PFM policy reform in Kenya: (i) the role (powers) and function of CFAs; (ii) benefit sharing...

  16. TECHNIQUE OF OPTIMAL AUDIT PLANNING FOR INFORMATION SECURITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    F. N. Shago

    2014-03-01

    Full Text Available Complication of information security management systems leads to the necessity of improving the scientific and methodological apparatus for these systems auditing. Planning is an important and determining part of information security management systems auditing. Efficiency of audit will be defined by the relation of the reached quality indicators to the spent resources. Thus, there is an important and urgent task of developing methods and techniques for optimization of the audit planning, making it possible to increase its effectiveness. The proposed technique gives the possibility to implement optimal distribution for planning time and material resources on audit stages on the basis of dynamics model for the ISMS quality. Special feature of the proposed approach is the usage of a priori data as well as a posteriori data for the initial audit planning, and also the plan adjustment after each audit event. This gives the possibility to optimize the usage of audit resources in accordance with the selected criteria. Application examples of the technique are given while planning audit information security management system of the organization. The result of computational experiment based on the proposed technique showed that the time (cost audit costs can be reduced by 10-15% and, consequently, quality assessments obtained through audit resources allocation can be improved with respect to well-known methods of audit planning.

  17. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  18. Practical implementation of a quality management system in a radiological department

    International Nuclear Information System (INIS)

    Huber, S.; Zech, C.J.

    2011-01-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards. (orig.) [de

  19. [Practical implementation of a quality management system in a radiological department].

    Science.gov (United States)

    Huber, S; Zech, C J

    2011-10-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.

  20. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  1. Risk Management method to ERP systems implementation based os critical sucess factors

    Directory of Open Access Journals (Sweden)

    Márcio Saez Caputo

    2004-10-01

    Full Text Available From the second half of years 90, the Enterprise Resource Planning (ERP systems implementation appears like one of the main investment focus related to the use of information technology in the companies, which aimed to acquire competitive advantages through cost reduction and differentiation of products with the use of these systems. ERP implementation showed to be much more than a technology project, involving structural and managing changes, becoming a complex and high risk process for the organizations. In the literature specialized on ERP, there are many examples of the difficulties of this type of project and about implementations that had not reached the expected objectives, frustrating the expectations of the contractors. The present work describes, first of all, the development of a risk management method to ERP systems implementation, based on critical success factors. Then, a case of application of the considered method is analyzed, detailing the steps and the results gotten until the moment. To the end, evidences regarding to how the method helps to improve risk management during ERP implementations are presented.

  2. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  3. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  4. Using Quality Improvement Methods to Implement an Electronic Medical Record (EMR) Supported Individualized Home Pain Management Plan for Children with Sickle Cell Disease.

    Science.gov (United States)

    Crosby, Lori E; Simmons, Kenya; Kaiser, Peggy; Davis, Blair; Boyd, Patricia; Eichhorn, Tiffany; Mahaney, Tracy; Joffe, Naomi; Morgan, Darice; Schibler, Kathy; Anderson, Viia; Quinn, Charles T; Kalinyak, Karen A

    2014-05-01

    Using quality improvement methodology, our goal was to develop and implement individualized home pain management plans (HPMP) that included pharmacologic as well as non-pharmacologic strategies for children with sickle cell disease (SCD). We hypothesized that successfully implemented HPMPs would have an impact on Emergency Department (ED) use, decreasing ED visits for uncomplicated SCD pain episodes. A multidisciplinary quality improvement team developed a questionnaire to assess the frequency, location and severity of a patient's pain during a routine, comprehensive visit in order to help the patient and family develop an effective pain management strategy using both pharmacologic and non-pharmacologic actions. Using plan do study act cycles (PDSAs), this team was able to build this process into the daily workflow for all SCD patients age 5 years to 21 years of age. Patients with comprehensive visits scheduled from January 2012 to May 2013 were included (N=188) in the intervention. By May of 2013, 88% of eligible patients had an individualized HPMP in place. There was a concomitant reduction in the percentage of SCD patients seen in the ED for uncomplicated SCD pain (6.9% vs. 1.1%). Using quality improvement methods, an individualized HPMP intervention was incorporated successfully into the daily workflow of a busy outpatient SCD clinic. This intervention has the potential to improve patient outcomes by decreasing avoidable ED visits as well as reducing overall healthcare costs.

  5. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  6. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  7. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  8. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    Science.gov (United States)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  10. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  11. Development and implementation of a watershed management plan forLlac la Biche, Alberta, Canada.

    Science.gov (United States)

    White, J; Logan, M; Rawles, M

    2006-01-01

    Lakeland County is experiencing increasing developmental pressures arising from the oil and gas boom at nearby Fort McMurray. There is increased industrial traffic passing through the county, and 600 new residential lots are proposed in 2005, almost double from 5 years ago. Deteriorating surface water quality has been a concern in the area due to an increase in development and agriculture, while excessive fish harvesting and winterkills have impacted commercial and recreational fisheries. Today, walleye and pike populations in the lake remain collapsed and restocking efforts have not been successful. Due to the lack of studies done on the watershed, the county is leading a multidisciplinary research study which includes a baseline water quality study, riparian health assessments, land use mapping and ground-truthing and projects with the local health authority. This research has been summarized in a comprehensive state of the watershed report, which will be used to complete a watershed management plan for the Lac la Biche watershed. Recommendations from the state of the watershed report and watershed management plan will also be incorporated into municipal planning documents and recommend changes to the Municipal Government Act itself.

  12. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  13. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  14. Organizational Factors that Affect the Implementation of Information Technology: Perspectives of Middle Managers in Iran.

    Science.gov (United States)

    Barzekar, Hosein; Karami, Mahtab

    2014-10-01

    to examine the organizational factors affecting the application of information technology in hospitals. Since the organizational factors are one of the most important determinants of successful projects, by understanding their impact and identifying them it can help planning a systematic IT implementation. In this cross-sectional descriptive study 110 middle managers were chosen from teaching hospitals. Structured questionnaire was used for the data collection. There was a significant relationship between organization resource, organizational knowledge, process, management structure and values and goals with implementation of information technology. Findings showed that organizational factors had a considerable impact on implementation of information technology. Top managers must consider the important aspects of effective organizational factors.

  15. Implementation of Knowledge Management in Organizations

    Science.gov (United States)

    Winkler, Katrin; Mandl, Heinz

    2007-01-01

    In the context of learning implementation of new ideas e.g. knowledge management in organizations often is neglected. Concerning knowledge management measures we demonstrate its implementation in organizations. A theoretical framework was developed showing the necessary basic conditions for implementing knowledge management. Subsequently we…

  16. Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians

    Energy Technology Data Exchange (ETDEWEB)

    Davenport, Lars [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Smythe, Louisa [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Sarquilla, Lindsey [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Ferguson, Kelly [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States)

    2015-03-27

    This plan outlines the Santa Ynez Band of Chumash Indians’ comprehensive energy management strategy including an assessment of current practices, a commitment to improving energy performance and reducing overall energy use, and recommended actions to achieve these goals. Vision Statement The primary objective of the Strategic Energy Management Plan is to implement energy efficiency, energy security, conservation, education, and renewable energy projects that align with the economic goals and cultural values of the community to improve the health and welfare of the tribe. The intended outcomes of implementing the energy plan include job creation, capacity building, and reduced energy costs for tribal community members, and tribal operations. By encouraging energy independence and local power production the plan will promote self-sufficiency. Mission & Objectives The Strategic Energy Plan will provide information and suggestions to guide tribal decision-making and provide a foundation for effective management of energy resources within the Santa Ynez Band of Chumash Indians (SYBCI) community. The objectives of developing this plan include; Assess current energy demand and costs of all tribal enterprises, offices, and facilities; Provide a baseline assessment of the SYBCI’s energy resources so that future progress can be clearly and consistently measured, and current usage better understood; Project future energy demand; Establish a system for centralized, ongoing tracking and analysis of tribal energy data that is applicable across sectors, facilities, and activities; Develop a unifying vision that is consistent with the tribe’s long-term cultural, social, environmental, and economic goals; Identify and evaluate the potential of opportunities for development of long-term, cost effective energy sources, such as renewable energy, energy efficiency and conservation, and other feasible supply- and demand-side options; and Build the SYBCI’s capacity for

  17. Tank farm instrumentation and data acquisition/management upgrade plan

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment

  18. Implementing Student Information Systems

    Science.gov (United States)

    Sullivan, Laurie; Porter, Rebecca

    2006-01-01

    Implementing an enterprise resource planning system is a complex undertaking. Careful planning, management, communication, and staffing can make the difference between a successful and unsuccessful implementation. (Contains 3 tables.)

  19. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  20. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  1. Implementation of the first adaptive management plan for a European migratory waterbird population: The case of the Svalbard pink-footed goose Anser brachyrhynchus

    Science.gov (United States)

    Madsen, Jesper; Williams, James Henty; Johnson, Fred A.; Tombre, Ingunn M.; Dereliev, Sergey; Kuijken, Eckhart

    2017-01-01

    An International Species Management Plan for the Svalbard population of the pink-footed goose was adopted under the Agreement on the Conservation of African-Eurasian Migratory Waterbirds in 2012, the first case of adaptive management of a migratory waterbird population in Europe. An international working group (including statutory agencies, NGO representatives and experts) agreed on objectives and actions to maintain the population in favourable conservation status, while accounting for biodiversity, economic and recreational interests. Agreements include setting a population target to reduce agricultural conflicts and avoid tundra degradation, and using hunting in some range states to maintain stable population size. As part of the adaptive management procedures, adjustment to harvest is made annually subject to population status. This has required streamlining of monitoring and assessment activities. Three years after implementation, indicators suggest the attainment of management results. Dialogue, consensus-building and engagement among stakeholders represent the major process achievements.

  2. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    OpenAIRE

    Ionica Oncioiu

    2014-01-01

    This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitiv...

  3. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is proposing to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP- approved Prevention of Significant Deterioration (PSD) permit programs. These proposed revisions update the definitions used in the districts' PSD permit programs.

  4. Sport Facility Planning and Management. Sport Management Library.

    Science.gov (United States)

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  5. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  6. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  7. Integration of biological, economic and sociological knowledge by Bayesian belief networks: the interdisciplinary evaluation of potential management plans for Baltic salmon

    DEFF Research Database (Denmark)

    Levontin, Polina; Kulmala, Soile; Haapasaari, Päivi Elisabet

    2011-01-01

    There is a growing need to evaluate fisheries management plans in a comprehensive interdisciplinary context involving stakeholders. The use of a probabilistic management model to evaluate potential management plans for Baltic salmon fisheries is demonstrated. The analysis draws on several scientific...... studies: a biological stock assessment with integrated economic analysis of the commercial fisheries, an evaluation of recreational fisheries, and a sociological study aimed at understanding stakeholder perspectives and potential commitment to alternative management plans. A Bayesian belief network is used...... is highlighted by modelling the link between commitment and implementation success. Such analyses, relying on prior knowledge, can forewarn of the consequences of management choices before they are implemented...

  8. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  9. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  10. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  11. The link between off-site-emergency planning and plant-internal accident management

    Energy Technology Data Exchange (ETDEWEB)

    Braun, H.; Goertz, R.

    1995-02-01

    A variety of accident management measures has been developed and implemented in the German nuclear power plants. They constitute a fourth level of safety in the defence-in-depth concept. The containment venting system is an important example. A functioning link with well defined lines of communication between plant-internal accident management and off-site disaster emergency planning has been established.

  12. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-19

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.

  13. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    Directory of Open Access Journals (Sweden)

    Ionica Oncioiu

    2014-10-01

    Full Text Available This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitive advantage resulting in innovative products, as well as the effectiveness of companies that use human resources evaluation platform. The need identified on the market to which the SMEs wish to answer by implementing the plan is represented by the nationwide lack of a complex solution covering both the evaluation and the management of human resources performances. The used methodology can be found in the analysis, developing a strategy for preventing financial, human, market, marketing - image risks and also the physical ones. With the SWOT analysis it was observed one of the strengths i.e. the existence of a single management system of employee performance that includes assessment specific features. In conclusion, there are no software solutions at national level, which would assess the human resources of an organization, following specific indicators of that organization, which could combine the assessment methods in order to achieve more a more efficient and versatile assessment.

  14. Implementation of Hepatitis Information Management System in Iran.

    Science.gov (United States)

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2015-11-17

    Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design's stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients' conditions. That mentioned system paves the way for the analysis of gathered information, managers' and specialists' access in different regions to

  15. Implementation of a change management solution based on a product lifecycle management system for a large international project

    International Nuclear Information System (INIS)

    Luehr, Anneke

    2011-08-01

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project

  16. STRATEGY IMPLEMENTATION STYLES OF MALAYSIAN, THAI AND HUNGARIAN MIDDLE MANAGERS

    Directory of Open Access Journals (Sweden)

    Maheshkumar P. Joshi

    2004-01-01

    Full Text Available There is a need for more comparative empirical research that examines middle manager roles in strategic change. This paper reports a study of middle managers in two dynamic settings: the Asia/Pacific region – Malaysia and Thailand; and Central/Eastern Europe – Hungary. Results of 213 respondents across three countries indicate that middle managers from all three tend toward use of authoritarian management styles even in proactive strategic change situations. However, Hungarians are less likely to use these styles than Thai and Malaysian middle managers. For all three countries, managers with less work experience were found to have lower tendencies to use an authoritarian style of implementation. When top managers exhibit an aggressive strategic posture, middle-managers from all three countries are also less likely to use an authoritarian style.Firms that want to stay competitive in the global market place must continuously evolve by successfully accomplishing strategic change (Struckman & Yammarino 2003. Although senior managers are critical in leading the strategic change process, even the best-planned strategic changes will not achieve their full potential unless they are well implemented. Part of the strategic leadership responsibility, therefore, includes establishing a climate in which the organization's rank and file will experience both a positive attitude about change and the confidence to actively seek change opportunities (Kanter 2003. Research attention is bringing more insight into the important roles of middle-managers in this process of implementing strategic change (Balogun & Jenkins 2003; Floyd & Wooldridge, 1992, 1994; Wooldridge & Floyd 1990. Although there is little doubt that active support by middle managers is critical for the strategies to be well implemented (Guth & MacMillan 1986, there remain many important questions with regard to how middle managers participate in this process (Balogun 2003.The need for research

  17. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  18. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    Energy Technology Data Exchange (ETDEWEB)

    Ji, H; Lorio, V; Cernica, G [Associates In Medical Physics, Lanham, MD (United States); Virginia Hospital Center, Arlington, VA (United States); Han, J; Nurhussien, M; Nasr, N; Hong, R [Virginia Hospital Center, Arlington, VA (United States)

    2016-06-15

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  19. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    International Nuclear Information System (INIS)

    Ji, H; Lorio, V; Cernica, G; Han, J; Nurhussien, M; Nasr, N; Hong, R

    2016-01-01

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  20. A Methodology to Implement an Information Security Management System

    Directory of Open Access Journals (Sweden)

    Alaíde Barbosa Martins

    2005-08-01

    Full Text Available Information security has actually been a major challenge to most organizations. Indeed, information security is an ongoing risk management process that covers all of the information that needs to be protected. ISO 17799 offers what companies need in order to better manage information security. The best way to implement this standard is to ease the security management process using a methodology that will define will define guidelines, procedures and tools that will be needed along the way. Hence, this paper proposes a methodology to assist companies in assessing their compliance with BS 7799/ ISO 17799 as well as planning and implementing the actions necessary to become compliant or certified to the standard. The concepts and ideas presented here had been applied in a case study involving the Cetrel S/A - Company of Environmental Protection. For this company, responsible for treatment of industrial residues generated by the Camaçari Petrochemical Complex and adjacent areas, to assure confidentiality and integrity of customers' data is a basic requirement.

  1. Fund management plan

    International Nuclear Information System (INIS)

    1983-05-01

    The Nuclear Waste Policy Act of 1982, P.L. 97-425 (the Act), provides for establishment of two separate special funds in the US Treasury, the Interim Storage Fund and the Nuclear Waste Fund (the Funds). The Interim Storage Fund (Sec. 136) is the financing mechanism for the provision of federal interim storage capacity, not to exceed 1900 metric tons, for spent nuclear fuel (SNF) from civilian reactors. Basically, interim storage of SNF is the responsibility of the owners and generators of nuclear wastes. Storage at government facilities will be provided only if the utilities do not have adequate storage capacity. The Nuclear Waste Fund (Sec. 302) is the statutory financing approach for the Department's radioactive waste disposal program. P.L. 97-425 directs utilities to pay a mandatory fee to cover DOE's expected costs for nuclear waste disposal. The Funds are administered by the Department of Energy. This Plan identifies how DOE will implement and manage the Nuclear Waste and Interim Storage Funds

  2. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  3. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2011-11-01

    ... the California State Implementation Plan, Placer County Air Pollution Control District AGENCY... the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management... internal combustion engines and water heaters. We are proposing to approve local rules to regulate these...

  4. Medizinbibliotheken: Innovativ denken, strategisch planen, praktisch umsetzen / Medical libraries: think innovative, plan strategically, implement in practice

    Directory of Open Access Journals (Sweden)

    Bauer, Bruno

    2011-12-01

    Full Text Available The focus of the current issue 3/2011 of GMS Medizin – Bibliothek – Information is the annual conference 2011 of the German Medical Libraries Association in Cologne. The motto of the conference was “Think innovative, plan strategically, implement in practice”. Focal points of the meeting were innovation management, marketing and new applications in medical libraries.The authors in this issue are Bruno Bauer, Daniel Formanek & Helmut Dollfuß (E-Books at medical libraries: They came to stay, Ursula Georgy (Systematic innovation management, Maurizio Grilli (New library portal at Province College for Health-Care Professions Claudiana, Bozen, Sabine Köhrer-Weisser (Marketing in One Person Libraries, Roland Mumenthaler (Innovation Management at ETH-Bibliothek, Markus Schmiel (Performance-related bonuses at Hannover Medical School: practical experience report of the library, Guus van den Brekel (Mobile Computing & Semantic Web in Health & Medicine, Iris Reimann & Sonja Fräntz (Think innovative, plan strategically, implement in practice – Annual Meeting 2011 of the German MLA, 19th to 21th September in Cologne and Eike Hentschel (Aus der AGMB.

  5. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes - Project

    International Nuclear Information System (INIS)

    Gazzo, Alexis; Robert, Jean-Gabriel; Abraham, Christophe; Benaze, Manon de

    2015-01-01

    A first document contains the project of the National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority, respectively on the plan preliminary focus, and on the plan itself. An answer to this last one is then proposed, followed by a synthesis of the plan project and the text of the corresponding decree

  6. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  7. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  8. NASE 2015: Implementation of a Management Quality System

    Science.gov (United States)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  9. Developing the (ASTM) voluntary consensus standards required to help implement the National Energy Plan

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The recommended guide is the first American Society for Testing and Materials (ASTM) matrix in a family of such documents that combined, will help manage the development of the ASTM standards considered necessary to implement the current National Plan for Energy Research, Development, and Demonstration. It is expected that the guide will provide a framework for standards development to complement the nation's research and development in support of critical energy needs. The recommended guide identifies the energy-critical areas that are to be developed, the master ASTM recommended guide for developing the standards required to help the National Plan, the section in which each energy-critical area is covered, and the suggested ASTM lead committee responsible for each area (fossil, solar, geothermal, conservation, fusion, and fission reactor development). A comprehensive matrix to identify the areas of need for which ASTM standards will be required to help implement the National Energy Plan is also presented

  10. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  11. Leadership and management curriculum planning for Iranian general practitioners.

    Science.gov (United States)

    Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza

    2015-10-01

    Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of  this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper

  12. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  13. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is taking direct final action to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP-approved Prevention of Significant Deterioration (PSD) permit programs. These revisions update the definitions used in the districts' PSD permit programs.

  14. Issues on safe radioactive waste management at ChNPP site in International Shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Kilochytska, T.; Gromyko, S.; Kadkin, Y.; Kondratiev, S.; Pavlenko, A.; Bogorinski, P.

    2003-01-01

    The International Shelter Implementation Plan (SIP) [1], is aimed to convert the ChNPP unit 4, destroyed by a beyond-design accident in 1986, into an environmentally safe facility by means of large-scale projects such as stabilization of the existing Sarcophagus (Shelter), construction of a New Safe Confinement (NSC), and installation of engineering and monitoring systems. This report presents some important safety issues concerning radioactive waste (RAW) management at the Shelter. One of the main problems of RAW management is to dispose of large volumes of RAW generated during ground preparation work. It is necessary that RAW be sorted carefully to separate low-active radioactive waste (LLW), which will be the majority, from high-level waste. Considering the fact that the Shelter is in the exclusion zone, the interim storage of LLW in this zone is possible, but a set of safety measures is required, e.g. prevention of dust generation or spreading of radioactivity with water. Another problem is high level RAW management. Highly radioactive fragments of the core, including fuel were ejected during the accident and are now buried under the man-made layer around the Shelter. Unanticipated disclosure of such fragments may happen during any ground preparation work as well as during clearing of premises inside the damaged buildings. Therefore, permanent radiation monitoring is required to prevent any intolerable exposure of workers. Unanticipated disclosure of high-active radioactive waste (HLW) could lead to considerable delay of any work. Since it is particularly difficult to remove HLW from those locations, which can not be easily accessed with removal equipment, such waste needs to be confined and properly shielded at in situ. Due to absence of a permanent HLW storage, an interim storage needs to be provided for in the territory of the Sarcophagus. (author)

  15. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    Science.gov (United States)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  16. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1995-08-01

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  17. Uncovering middle managers' role in healthcare innovation implementation.

    Science.gov (United States)

    Birken, Sarah A; Lee, Shoou-Yih Daniel; Weiner, Bryan J

    2012-04-03

    Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation.

  18. Implementation plans for the Korean certified tumor registrar qualification system.

    Science.gov (United States)

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  19. MaRDI-Gross – Data Management and Preservation Planning for Large Projects

    International Nuclear Information System (INIS)

    Jones, RWL; Henderson, RCW; Bicarregui, JC; Lambert, SC; Matthews, BM; Gray, N

    2012-01-01

    The MaRDI-Gross project aims to provide high-level guidance for the strategic and engineering development of Data Management and Preservation plans for Big Science data. The main outcome will be a document, the nominal audience for which is therefore rather narrow. However, the intention is that the document be of use to other planners and data architects who wish to implement good practice in this area. The goal of the document is not to provide mechanically applicable recipes, but to allow the user to develop and lead a high-level plan which is appropriate to their organisation. Throughout, the document is informed where appropriate by the OAIS reference model, which generally provides a useful guide to HEP data management planning.

  20. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.