WorldWideScience

Sample records for management contract quality

  1. Quality management and quality assurance contracts

    International Nuclear Information System (INIS)

    Teichler, M.

    1991-01-01

    Quality assurance contracts belong to the most important instruments of quality management systems. As a result of such contracts, quality control is to be done not only by the buyer, but is made a task to be fulfilled by the manufacturer. The author of the article shows that quality assurance contracts do change the contractual relationship between supplier and buyer, but have no effect on economic and practical conditions. This is so because quality assurance contracts apply only to warranty claims, which play a subordinate role in the legal relationship between producer and buyer, or producer and consumer, as compared to the claims for damages arising out of the contracts. (orig.) [de

  2. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  3. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  4. Outsourcing Contract Success: A Quality Management Perspective

    OpenAIRE

    Vanita Yadav; B.A. Metri

    2010-01-01

    Despite the phenomenal growth in outsourcing of various business functions like Enterprise Systems outsourcing, IT outsourcing, and Business Process outsourcing, there has been relatively less attention given to the high-risk area of outsourcing contracts. In this regard, contract has been the conventional medium for governing outsourcing relationships. This study aims to bring forward the importance of quality in the entire contracting process, involving contract planning, pre-contract negot...

  5. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  6. A survey of innovative contracting for quality jobs and ecosystem management.

    Science.gov (United States)

    Cassandra Moseley

    2002-01-01

    This survey identifies and defines innovative contracting mechanisms developed in the Forest Service Pacific Northwest Region and northern California. A survey of nine case studies reveals that several new mechanisms have facilitated ecosystem management, quality jobs, and administrative efficiencies, but at times innovation was hampered by Forest Service institutional...

  7. Assessment of Navy Contract Management Processes

    Science.gov (United States)

    2016-04-30

    capability? • 85% of quality problems are related to processes, while only 15% of problems are controlled by individual workers ( Deming , 1986...eligible participants: 369 • Total surveys completed: 185 • Response rate: 50% CONTRACT MANAGEMENT MATURITY MODEL© MATURITY LEVEL 5...Measurement – Organizations systematically use performance metrics to measure the quality and evaluate the effectiveness of the contract management

  8. A comparative analysis of quality management standards for contract research organisations in clinical trials.

    Science.gov (United States)

    Murray, Elizabeth; McAdam, Rodney

    2007-01-01

    This article compares and contrasts the main quality standards in the highly regulated pharmaceutical industry with specific focus on Good Clinical Practice (GCP), the standard for designing, conducting, recording and reporting clinical trials involving human participants. Comparison is made to ISO quality standards, which can be applied to all industries and types of organisation. The study is then narrowed to that of contract research organisations (CROs) involved in the conduct of clinical trials. The paper concludes that the ISO 9000 series of quality standards can act as a company-wide framework for quality management within such organisations by helping to direct quality efforts on a long-term basis without any loss of compliance. This study is valuable because comparative analysis in this domain is uncommon.

  9. The 'Alternative Quality Contract,' based on a global budget, lowered medical spending and improved quality.

    Science.gov (United States)

    Song, Zirui; Safran, Dana Gelb; Landon, Bruce E; Landrum, Mary Beth; He, Yulei; Mechanic, Robert E; Day, Matthew P; Chernew, Michael E

    2012-08-01

    Seven provider organizations in Massachusetts entered the Blue Cross Blue Shield Alternative Quality Contract in 2009, followed by four more organizations in 2010. This contract, based on a global budget and pay-for-performance for achieving certain quality benchmarks, places providers at risk for excessive spending and rewards them for quality, similar to the new Pioneer Accountable Care Organizations in Medicare. We analyzed changes in spending and quality associated with the Alternative Quality Contract and found that the rate of increase in spending slowed compared to control groups, more so in the second year than in the first. Overall, participation in the contract over two years led to savings of 2.8 percent (1.9 percent in year 1 and 3.3 percent in year 2) compared to spending in nonparticipating groups. Savings were accounted for by lower prices achieved through shifting procedures, imaging, and tests to facilities with lower fees, as well as reduced utilization among some groups. Quality of care also improved compared to control organizations, with chronic care management, adult preventive care, and pediatric care within the contracting groups improving more in year 2 than in year 1. These results suggest that global budgets with pay-for-performance can begin to slow underlying growth in medical spending while improving quality of care.

  10. Multiple Challenges of Flexible Workforce Management: the contract managers experience

    Directory of Open Access Journals (Sweden)

    Yana Torres de Magalhães

    2010-07-01

    Full Text Available This article presents the results of a survey that had the purpose to evaluate the human resources (HR practices adopted by a Brazilian industrial corporation from the viewpoint of contracting out managers to deal with four flexible workforce management challenges: qualification; quality; commitment; standardization of outsourcing services. These HR practices are still little discussed by scholars. So, this is the main contribution of this article. It is also virtually nonexistent in the literature studies that encompass analysis about HR practices to deal with major challenges of outsourcing throughout the viewpoint of contracting out managers. We performed 15 semi-structured interviews with contracting out managers. It was also performed a documental analysis about the rules of outsourcing practices of the corporation. We found management practices to deal with each of the four challenges presented. The management of contracts and the provision of training programs were the most prominent of the related practices. The results show that Brazillian labor laws contribute to the segregation of temporary workers, because the companies avoid a more direct relationship fearing legal constraints. Although several efforts were put to improve the work conditions of the flexible workforce, these workers are still stigmatized, seen and treated as less important than direct employers; this causes negative impacts on commitment. The decision to use flexible workforce by companies is still mainly due to cost savings. Therefore, there is still a long way to improve HR practices related to temporary workers in order to avoid losses for all the social actors envolved.

  11. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  13. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  14. 48 CFR 12.208 - Contract quality assurance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract quality assurance... Items 12.208 Contract quality assurance. Contracts for commercial items shall rely on contractors' existing quality assurance systems as a substitute for Government inspection and testing before tender for...

  15. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  16. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  17. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  18. 48 CFR 2452.242-71 - Contract management system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  19. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  20. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  1. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to...

  2. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  3. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  4. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  5. Certified symbolic management of financial multi-party contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2015-01-01

    Domain-specific languages (DSLs) for complex financial contracts are in practical use in many banks and financial institutions today. Given the level of automation and pervasiveness of software in the sector, the financial domain is immensely sensitive to software bugs. At the same time...... automatically extract a Haskell implementation of an embedded contract DSL along with the formally verified contract management functionality. This approach opens a road map towards more reliable contract management software, including the possibility of analysing contracts based on symbolic instead of numeric...

  6. Price management mechanisms and the gas contract

    International Nuclear Information System (INIS)

    Dickson, D.J.

    1996-01-01

    Pricing objectives and risk management strategies that can be achieved through the proper use of the standard gas contract, were discussed. Main topics of discussion were: (1) gas sales contract and convertible pricing, (2) gas contract and imbedded hedging, gas contracts and exchange traded instruments, (4) gas contracts fixed for floating swaps, and OTC options and exotics, (5) options and exotic price structures, and (6) advantages and disadvantages of using the gas contract versus the swap agreement

  7. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  8. 6th Workshop on waste management contracts

    International Nuclear Information System (INIS)

    2000-01-01

    The workshop was intended for participants from industry and the service sector and municipalities responsible in particular for the legal aspects involved in the waste management business, namely for concluding the contracts with customers and contractors and for contract management in compliance with the laws and regulations of Germany and the European Union, including the relevant pollution control and monitoring obligations. Participants of the workshop received in-depth information and guidance through discussion of contracts and document types of relevance in this context. (orig./CB) [de

  9. 25 CFR 533.2 - Time for submitting management contracts and amendments.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Time for submitting management contracts and amendments. 533.2 Section 533.2 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR MANAGEMENT CONTRACT PROVISIONS APPROVAL OF MANAGEMENT CONTRACTS § 533.2 Time for submitting management contracts and...

  10. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  11. Career Management and the Changing Psychological Contract.

    Science.gov (United States)

    Atkinson, Carol

    2002-01-01

    A 1993 survey in a British bank revealed a lack of strategic approaches to career management and a negative psychological contract. A 2000 follow-up showed that employees viewed the new contract as a regression from a relational to a transactional approach. They had increased responsibility for career development, but management failed to provide…

  12. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  13. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  14. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  15. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    Science.gov (United States)

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  16. Development of a quality system for a contract irradiation facility

    International Nuclear Information System (INIS)

    Siyakus, G.

    2002-01-01

    . Even, some conditions required by the primary producer may be impossible to apply because of the design parameters of the facility or economical reasons. The worst situation is, transforming the commodity to be processed into garbage, because of the any misapprehension among the customer and the organization running the facility, or any level of misleading among the internal communication chain of the organization. Therefore, every step of the process from delivery of the product by the principal manufacturer up to the release of the commodity after irradiation should be firmly defined, organized, documented, validated and certified. The purpose of the irradiation may be at variance from decontamination of a food commodity to the sterilization of a medical supply. To make things easier, the case study which will be presented in the scope of this paper is limited with the radiation sterilization of medical supplies at the Food Irradiation and Sterilization Department (FISD) of Ankara Nuclear Research Center of Agriculture and Animal Science (ANRCAAS). To meet the requirements stated by the contract, an appropriate quality management system should be implemented. Basic activities for implementing a quality management system should be: A policy for quality management, An appropriate work flow, Contract model to make certain the demand of the primary producer, Straightforward documentation of the management responsibilities, Suitable premises, equipment and materials, Well defined and documented procedures, processes to be applied on the product, Traceable batch, product and dosimetry records, Definitely the radiation, chemical and biological safety issues related to the personnel working in the quality control laboratories and irradiation facility are more essential issues than the above mentioned topics and should be included into the quality system

  17. Managing the financial cost of exception to contracting standards

    DEFF Research Database (Denmark)

    Henschel, Rene Franz

    2008-01-01

    In managing financial cost of exception to contracting standards, the first step is to put up an intelligent contract standards exception monitoring system The next step is to maintain tailor-made, fair and transparent contracting standards The third step is to eliminate unnecessary information...... and repetitiveness in contracting standards The fourth step is to enable your organization and the customers or suppliers to handle the necessary exceptions themselves Finally you should consider the use of independent contracting standards and elimination of your own standards as a tool in managing the cost...

  18. 48 CFR 46.202-1 - Contracts for commercial items.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for commercial... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-1 Contracts for commercial items. When acquiring commercial items (see part 12), the Government shall rely on contractors' existing...

  19. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  20. Corporate management of quality in employee health plans.

    Science.gov (United States)

    Maxwell, James; Temin, Peter

    2003-01-01

    As large companies move their employees into managed care, they must concern themselves with the quality and price of their employees' health care. Based on a survey of Fortune 500 companies, we show that most are integrating several aspects of quality into their purchasing and contracting decisions by focusing on three dimensions--customer service, network composition, and clinical quality. Companies focus on the customer service dimension while the medical community emphasizes clinical quality.

  1. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  2. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  3. The missing link between maintenance contracts and flexible asset management

    OpenAIRE

    Marttonen-Arola, Salla; Viskari, Sari; Kärri, Timo

    2013-01-01

    The paper shows how additional value can be created in maintenance collaboration through integrating the features of flexible asset management into maintenance contracts. We expand the traditional typology of maintenance contracts and introduce a new contract type, flexible asset management contracts. Also value sharing in the new contract type is discussed. Our logic for sharing the value is based on reaching for win-win situations in industrial maintenance collaboration. Finally, we present...

  4. Comparative analysis between the manager contract and the administrator contract in the activity of hotel services from Romania

    Directory of Open Access Journals (Sweden)

    Neacșu, A.

    2012-01-01

    Full Text Available In the activity of any hotel company, the manager or the administrator plays an important role; that is why the relationships of the hotel units with managers and administrators must be well defined and assumed by both sides by means of specific contracts. Between the manager contract and the administrator contract there are similarities, but also differences. This paper analyzes the advantages and disadvantages that the two contracts present and also the situations in which they are recommended.

  5. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  6. The method innovation in nuclear equipment quality witness tracing and management

    International Nuclear Information System (INIS)

    Hao Guang

    2012-01-01

    The total construction cost of a nuclear power plant, equipment procurement cost accounts for about 47%-53%. Whether the quality of equipment can meet the technical requirements plays a significant role in the operation and maintenance of a nuclear power plant. Only if we adopt effective management can the equipment quality be ensured. As the most important method of quality control, the effective attendance and track of quality witness points has a crucial effect on contract smooth implementation as well. The essay mainly illustrates the method of quality witness point tracing and management and how to incorporate serious minded ideas and all take part in ways into quality management, hoping to offer some enlightenment on the innovation of nuclear power equipment quality management. (author)

  7. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  8. 48 CFR 42.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Office Functions 42... officer. (5) Negotiate forward pricing rate agreements (see 15.407-3). (6) Negotiate advance agreements..., packaging, and packing. (38) Ensure contractor compliance with contractual quality assurance requirements...

  9. [Impact of 3 years of contract implementation on the quality of cataract surgery].

    Science.gov (United States)

    Begiristain, J; Elizalde, B; Ibarluzea, J; Mendicute, J; Sola, C

    1999-01-01

    To assess the adequacy to clinical practice of cataract procedures contracted in the Gipuzkoa Health Area (in public as well as concerted hospitals) from 1995. A second aim is to identify the achievements obtained three years after its implementation comparing the data with those of 1994, a year before. Before its implementation a multidisciplinar team established the number of surgical procedures to be contracted each year by age and sex, as well as the technical and quality conditions (out-patient surgery, loco-regional anaesthetic, facoemulsification, etc.). Data used for the assessment: Cataracts Registry of the Ophthalmologic Unit, Patient Management Categories and surgical waiting lists. During the period studied, 8,073 cataract operations were performed, 9% higher than expected. The distribution by age and sex was as estimated. Technical and quality standards were fulfilled, except for the surgical waiting list, in at least 75% of the procedures. The surgical technique mainly used was facoenmulsification, increasing from 15% in 1994 to 76.5% in 1997. The contracting of cataract surgery has allowed the assessment, reordering, and establishment of standards of care for all the professionals involved in the process. There were improvements in clinical practice during the period studied. This has given raise to the homogenisation of care in all the units following technical and quality standards, meaning better equity for the patients in need of the procedure.

  10. R and D contract management systems in the USA; Beikoku ni okeru R and D contract kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Outlined herein are the US Government's R and D contract management, which is considered to have greatly contributed to promotion of innovation in the USA. The procedures for the R and D contracts are managed through the mechanisms of the (government procurement), following the FAR (Federal Acquisition Regulations) that govern the government procurement rules. The procedural flow includes planning, public announcement of inviting the application documents, examination of the applications, negotiations, granting the fund, project management, suspension of the project and completion of the project. The audition sometimes takes several years to complete. The staff managing the individual contract is fairly specialized, and a team consisting of several professionals is responsible for each project. The substantial lifetime training systems the contract officers can receive are established. The alternative contract system encourages the applications from consortiums, and private enterprises frequently tie up with academic organizations to apply for the funds. Granting the funds to consortiums have many advantages, e.g., cost sharing and technological transfer. (NEDO)

  11. The design of optimal electric power demand management contracts

    Science.gov (United States)

    Fahrioglu, Murat

    1999-11-01

    Our society derives a quantifiable benefit from electric power. In particular, forced outages or blackouts have enormous consequences on society, one of which is loss of economic surplus. Electric utilities try to provide reliable supply of electric power to their customers. Maximum customer benefit derives from minimum cost and sufficient supply availability. Customers willing to share in "availability risk" can derive further benefit by participating in controlled outage programs. Specifically, whenever utilities foresee dangerous loading patterns, there is a need for a rapid reduction in demand either system-wide or at specific locations. The utility needs to get relief in order to solve its problems quickly and efficiently. This relief can come from customers who agree to curtail their loads upon request in exchange for an incentive fee. This thesis shows how utilities can get efficient load relief while maximizing their economic benefit. This work also shows how estimated customer cost functions can be calibrated, using existing utility data, to help in designing efficient demand management contracts. In order to design such contracts, optimal mechanism design is adopted from "Game Theory" and applied to the interaction between a utility and its customers. The idea behind mechanism design is to design an incentive structure that encourages customers to sign up for the right contract and reveal their true value of power. If a utility has demand management contracts with customers at critical locations, most operational problems can be solved efficiently. This thesis illustrates how locational attributes of customers incorporated into demand management contract design can have a significant impact in solving system problems. This kind of demand management contracts can also be used by an Independent System Operator (ISO). During times of congestion a loss of economic surplus occurs. When the market is too slow or cannot help relieve congestion, demand management

  12. 48 CFR 46.305 - Cost-reimbursement service contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement service... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.305 Cost-reimbursement service contracts. The contracting officer shall insert the clause at 52.246-5, Inspection of Services—Cost Reimbursement, in...

  13. 48 CFR 46.303 - Cost-reimbursement supply contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement supply... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.303 Cost-reimbursement supply contracts. The contracting officer shall insert the clause at 52.246-3, Inspection of Supplies—Cost-Reimbursement, in...

  14. Ranking sources of hospital quality information for orthopedic surgery patients: consequences for the system of managed competition.

    NARCIS (Netherlands)

    Bes, R.E.; Berg, B. van den

    2013-01-01

    Background: Healthcare quality information is crucial for the system of managed competition. Within a system of managed competition, health insurers can selectively contract care providers and are allowed to channel patients towards contracted providers. The idea is that insurers have a stronger

  15. Software quality assurance and information management, October 1986 to October 1992

    International Nuclear Information System (INIS)

    Hill, I.E.

    1993-01-01

    This report describes the work carried out by Cedar Design Systems Limited under contract PECD 7/9/384. The brief for the contract was initially to provide advice on Software Quality Assurance (SQA) as part of the CEC PACOMA project. This was later extended to include further SQA and information management tasks specific to the HMIP Radioactive Waste Disposal Assessments Research Programme. (Author)

  16. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  17. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  18. Contracts and management services site support program plan WBS 6.10.14

    Energy Technology Data Exchange (ETDEWEB)

    Knoll, J.M. Jr.

    1994-09-01

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Program Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.

  19. The Importance of Employment Contract for Umsida Quality Employees Improvement

    Directory of Open Access Journals (Sweden)

    Noor Fatimah Mediawati

    2015-12-01

    Full Text Available The absence of employment contracts in UMSIDA recognized cause some problems. Especially in improving the performance of employees. Issues a little more disturbing harmonious labor relations between employees and UMSIDA. In the terminology of the Labour Act, employment contract terms it is known as the Employment Agreement. Where the existence of labor agreement / contract employment is expected to harmonize the working relationship with the employer in accordance with the applicable rules. The existence of employment contracts is also a legal instrument which according to researchers ought to be put forward in efforts to increase the qualifications and competence of employees. By contract it will also avoid things that are not desirable in an employment relationship, because each party will always carry out their rights and responsibilities are aligned and balanced. Tranquility in the work and the guarantee of legal protection are expected to improve employee performance especially towards quality UMSIDA 2020. So this study explored further the urgency employment contract once its design. How To Cite: Mediawati, N., & Phahlevy, R. (2015. The Importance of Employment Contract for Umsida Quality Employees Improvement. Rechtsidee, 2(2, 141-156. doi:http://dx.doi.org/10.21070/jihr.v2i2.106

  20. Why Training for Service Contract Management is Mission Essential

    National Research Council Canada - National Science Library

    Friar, Allen

    2005-01-01

    ... Programs provide vital services and act as force multipliers for forward deployment units. Consequently, a transformation in contracting and acquisition leadership along with proper planning is necessary to manage contracts...

  1. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  2. Lower- Versus Higher-Income Populations In The Alternative Quality Contract: Improved Quality And Similar Spending.

    Science.gov (United States)

    Song, Zirui; Rose, Sherri; Chernew, Michael E; Safran, Dana Gelb

    2017-01-01

    As population-based payment models become increasingly common, it is crucial to understand how such payment models affect health disparities. We evaluated health care quality and spending among enrollees in areas with lower versus higher socioeconomic status in Massachusetts before and after providers entered into the Alternative Quality Contract, a two-sided population-based payment model with substantial incentives tied to quality. We compared changes in process measures, outcome measures, and spending between enrollees in areas with lower and higher socioeconomic status from 2006 to 2012 (outcome measures were measured after the intervention only). Quality improved for all enrollees in the Alternative Quality Contract after their provider organizations entered the contract. Process measures improved 1.2 percentage points per year more among enrollees in areas with lower socioeconomic status than among those in areas with higher socioeconomic status. Outcome measure improvement was no different between the subgroups; neither were changes in spending. Larger or comparable improvements in quality among enrollees in areas with lower socioeconomic status suggest a potential narrowing of disparities. Strong pay-for-performance incentives within a population-based payment model could encourage providers to focus on improving quality for more disadvantaged populations. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Taboos and social contracts: Tools for ecosystem management ...

    African Journals Online (AJOL)

    Traditional taboos and social contracts played an important role in managing the Manambolomaty RAMSAR site. Taboos are defined as a prohibition imposed by social custom as a protective measure' and social contracts are – in conservation sense – a common agreement for achieving conservation, sustainable ...

  4. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  5. Can contracted out health facilities improve access, equity, and quality of maternal and newborn health services? Evidence from Pakistan.

    Science.gov (United States)

    Zaidi, Shehla; Riaz, Atif; Rabbani, Fauziah; Azam, Syed Iqbal; Imran, Syeda Nida; Pradhan, Nouhseen Akber; Khan, Gul Nawaz

    2015-11-25

    The case of contracting out government health services to non-governmental organizations (NGOs) has been weak for maternal, newborn, and child health (MNCH) services, with documented gains being mainly in curative services. We present an in-depth assessment of the comparative advantages of contracting out on MNCH access, quality, and equity, using a case study from Pakistan. An end-line, cross-sectional assessment was conducted of government facilities contracted out to a large national NGO and government-managed centres serving as controls, in two remote rural districts of Pakistan. Contracting out was specific for augmenting MNCH services but without contractual performance incentives. A household survey, a health facility survey, and focus group discussions with client and spouses were used for assessment. Contracted out facilities had a significantly higher utilization as compared to control facilities for antenatal care, delivery, postnatal care, emergency obstetric care, and neonatal illness. Contracted facilities had comparatively better quality of MNCH services but not in all aspects. Better household practices were also seen in the district where contracting involved administrative control over outreach programs. Contracting was also faced with certain drawbacks. Facility utilization was inequitably higher amongst more educated and affluent clients. Contracted out catchments had higher out-of-pocket expenses on MNCH services, driven by steeper transport costs and user charges for additional diagnostics. Contracting out did not influence higher MNCH service coverage rates across the catchment. Physical distances, inadequate transport, and low demand for facility-based care in non-emergency settings were key client-reported barriers. Contracting out MNCH services at government health facilities can improve facility utilization and bring some improvement in  quality of services. However, contracting out of health facilities is insufficient to increase

  6. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    Science.gov (United States)

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been

  7. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  8. An Analysis of Internal Controls for DoD Contract Management

    Science.gov (United States)

    2015-12-01

    alternative control activities to reduce the risk of fraud ( COSO , 2013; GAO, 2014). Also, the Office of Management and Budget (OMB), which contains an...force. Since 1992, the Government Accountability Office (GAO) has identified contract management within the DOD as an area for high risk in fraud...force. Since 1992, the Government Accountability Office (GAO) has identified contract management within the DOD as an area for high risk in fraud

  9. Ranking sources of hospital quality information for orthopedic surgery patients: consequences for the system of managed competition.

    Science.gov (United States)

    Bes, Romy Evelien; van den Berg, Bernard

    2013-01-01

    Healthcare quality information is crucial for the system of managed competition. Within a system of managed competition, health insurers can selectively contract care providers and are allowed to channel patients towards contracted providers. The idea is that insurers have a stronger bargaining position compared to care providers when they are able to channel patients. In the Dutch system of managed competition that was implemented in 2006, channelling patients to preferred providers has not yet been very successful. Empirical knowledge of which sources of hospital quality information they find important may help us to understand how to channel patients to preferred providers. The objective of this survey was to measure how patients rank various sources of information when they compare hospital quality in a system of managed competition. A written survey was conducted among clients of a large Dutch health insurance company. These clients underwent orthopedic surgery on the hip or knee no longer than 12 months ago. Two major players within a system of managed competition-health insurers and the government-were not seen as important sources of hospital quality information. In contrast, own experience and general practitioners (GPs) were seen as the most important sources of hospital quality information within the Dutch system of managed competition. Health insurers should take the main finding-that GPs are the most important source of hospital quality information-into account when they contract care providers and develop strategies for channeling patients towards preferred providers. A well-functioning system of managed competition will benefit patients, as it involves incentives for care providers to increase healthcare quality and to produce at the lowest cost per unit of quality.

  10. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  11. Measuring Healthcare Providers' Performances Within Managed Competition using Multidimensional Quality and Cost Indicators

    NARCIS (Netherlands)

    Portrait, F.R.M.; van den Berg, B.

    2015-01-01

    Background and objectives: The Dutch healthcare system is in transition towards managed competition. In theory, a system of managed competition involves incentives for quality and efficiency of provided care. This is mainly because health insurers contract on behalf of their clients with healthcare

  12. Contract Management: Organisational and Legal Form of Hotel Networks

    OpenAIRE

    Burak Tatyana V.

    2013-01-01

    Hotel business has been the most dynamic and profitable segment of economy, which is characterised with a high degree of internationalisation of capital and international character, during the recent decades. We clearly observe development of national and international hotel networks at this stage. Management contract is one of the methods of development and creation of hotel networks. The article describes theoretical basis of introduction of the contract management into the hotel business, ...

  13. 48 CFR 46.309 - Research and development contracts (short form).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Research and development... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.309 Research and development contracts... Development (Short Form), in solicitations and contracts for research and development when the clause...

  14. Asset Allocation and Optimal Contract for Delegated Portfolio Management

    Science.gov (United States)

    Liu, Jingjun; Liang, Jianfeng

    This article studies the portfolio selection and the contracting problems between an individual investor and a professional portfolio manager in a discrete-time principal-agent framework. Portfolio selection and optimal contracts are obtained in closed form. The optimal contract was composed with the fixed fee, the cost, and the fraction of excess expected return. The optimal portfolio is similar to the classical two-fund separation theorem.

  15. An Analysis of Category Management of Service Contracts

    Science.gov (United States)

    2017-12-01

    comprised of four steps to guide future category management teams in analyzing data and applying Category Management principles through the use of...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT AN ANALYSIS OF CATEGORY MANAGEMENT OF SERVICE CONTRACTS December 2017...Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project

  16. 75 FR 72830 - Medicare Program; Quality Improvement Organization (QIO) Contracts: Solicitation of Proposals...

    Science.gov (United States)

    2010-11-26

    ...] Medicare Program; Quality Improvement Organization (QIO) Contracts: Solicitation of Proposals From In-State... the Social Security Act (the Act) to provide at least 6 months' advance notice of the expiration dates of contracts with out- of-State Quality Improvement Organizations (QIOs) before renewing any of those...

  17. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  18. Managing Quality

    CERN Document Server

    Kelemen, Mihaela L

    2002-01-01

    Managing Quality provides a comprehensive review and critical analysis of quality management discourses and techniques by drawing on a number of management disciplines such as operations management, HRM, organizational behaviour, strategy, marketing and organization theory. The book: - introduces readers to key concepts and issues in quality management - provides an overview of both managerial and critical perspectives on quality management - presents the 'wisdom' of quality management gurus - documents the way quality is pursued in manufacturing, service and public sector organizations - comp

  19. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.308 Cost-reimbursement... of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  20. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract DAAA09-81-G-2008-0031)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Frawley, John; Bennett, Karen M

    2005-01-01

    .... Defense Contract Management Agency (DCMA), Pittsburgh, Pennsylvania, personnel stated that the former Defense Contract Administration Services Region Philadelphia initially paid the contract until the payment function was transferred...

  1. 42 CFR 438.356 - State contract options.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false State contract options. 438.356 Section 438.356 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS MANAGED CARE External Quality Review § 438.356 State contract options...

  2. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  3. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract No. F30602-81-C-0153)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Bennett, Karen M

    2005-01-01

    .... The Defense Contract Management Agency (DCMA) office in Orlando, Florida, administered the contract until October 7, 1985, when the responsibility for contract administration was transferred to the DCMA office in Palm Bay, Florida...

  4. The role of metrics and measurements in a software intensive total quality management environment

    Science.gov (United States)

    Daniels, Charles B.

    1992-01-01

    Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

  5. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  6. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  7. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    Science.gov (United States)

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  8. 48 CFR 46.307 - Fixed-price research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.307 Fixed-price research and development... Development—Fixed-Price, in solicitations and contracts for research and development when (1) the primary... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price research and...

  9. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  10. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  11. Information technology: management issues in outsource contracts.

    OpenAIRE

    2008-01-01

    This study concerns the investigation of management issues within information technology outsourcing contracts. The information technology outsourcing life cycle is used as the flow structure for the investigation. The associated user expectations that occur in each of the phases of the information technology outsourcing life cycle are identified. Following the identification of the management and user expectation issues in each phase of the outsource life cycle, the “Coetzee solution framewo...

  12. Marine Corps Contract Supply Model for High Quality Male Enlistment Contracts at the Recruiting Sub Station Level

    National Research Council Canada - National Science Library

    Welsh, Brian K

    2008-01-01

    .... This research develops contract production models at the Recruiting Sub Station level to estimate the effects of local economic conditions, demographics, and recruiting resources on new high quality...

  13. Contract Management Process Maturity: Empirical Analysis of Organizational Assessments

    Science.gov (United States)

    2009-08-27

    with the National Contract Management Association (NCMA), a Certified Purchasing Manager ( CPM ) with the Institute for Supply Management (ISM), and a...include advertising procurement opportunities, conducting industry and pre-proposal conferences, and amending solicitation documents as required. 4...with organizational core processes include advertising procurement opportunities, conducting solicitation and pre-proposal conferences, and amending

  14. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  15. 25 CFR 533.3 - Submission of management contract for approval.

    Science.gov (United States)

    2010-04-01

    ...) For new contracts and new operations, a three (3)-year business plan which sets forth the parties... operations, a three (3)-year business plan which sets forth the parties' goals, objectives, budgets... 25 Indians 2 2010-04-01 2010-04-01 false Submission of management contract for approval. 533.3...

  16. Quality management system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mu Sung

    2009-08-15

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  17. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  18. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  19. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  20. Options analysis of managed care contracting and regulation: theory and evidence.

    Science.gov (United States)

    McLean, R A; Magiera, F T

    2000-08-01

    Managed care contracts can be represented as bundles of options. In particular, the managed care provider is short a call option. To hedge the risk involved in such contracts, managed care contractors can construct several types of virtual put options, among them the ownership of facilities. Agency theory and options theory suggest that for-profit managed care plans, in the presence of debt, will engage in less hedging activity than will other managed care plans. Here, the authors test that hypothesis, using data for Florida HMOs in 1995, and they reject the null hypothesis. That managed care organizations act as if they are short a call option raises interesting regulatory issues, including the possibility of using a hedge-based regulatory scheme in place of a net-worth-based scheme.

  1. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  2. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  3. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  4. The application of total quality management principles to spacecraft mission operations

    Science.gov (United States)

    Sweetin, Maury

    1993-03-01

    By now, the philosophies of Total Quality Management have had an impact on every aspect of American industrial life. The trail-blazing work of Deming, Juran, and Crosby, first implemented in Japan, has 're-migrated' across the Pacific and now plays a growing role in America's management culture. While initially considered suited only for a manufacturing environment, TQM has moved rapidly into the 'service' areas of offices, sales forces, and even fast-food restaurants. The next logical step has also been taken - TQM has found its way into virtually all departments of the Federal Government, including NASA. Because of this widespread success, it seems fair to ask whether this new discipline is directly applicable to the profession of spacecraft operations. The results of quality emphasis on OAO Corporation's contract at JPL provide strong support for Total Quality Management as a useful tool in spacecraft operations.

  5. The application of total quality management principles to spacecraft mission operations

    Science.gov (United States)

    Sweetin, Maury

    1993-01-01

    By now, the philosophies of Total Quality Management have had an impact on every aspect of American industrial life. The trail-blazing work of Deming, Juran, and Crosby, first implemented in Japan, has 're-migrated' across the Pacific and now plays a growing role in America's management culture. While initially considered suited only for a manufacturing environment, TQM has moved rapidly into the 'service' areas of offices, sales forces, and even fast-food restaurants. The next logical step has also been taken - TQM has found its way into virtually all departments of the Federal Government, including NASA. Because of this widespread success, it seems fair to ask whether this new discipline is directly applicable to the profession of spacecraft operations. The results of quality emphasis on OAO Corporation's contract at JPL provide strong support for Total Quality Management as a useful tool in spacecraft operations.

  6. 77 FR 12925 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2012-03-02

    ...-Reimbursement Contracts AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and... addresses the use and management of cost- reimbursement contracts. DATES: Effective Date: April 2, 2012 FOR...-reimbursement contracts in the following three areas: 1. Circumstances when cost-reimbursement contracts are...

  7. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  8. Internet quality management

    International Nuclear Information System (INIS)

    Park, Yeong Taek; Song, Hae Geun

    2000-09-01

    This book guides the useful application of internet quality management. It mentions understanding of modern quality management, which includes basics of quality management, six sigma quality innovation, best system, search way of quality information, consideration for effective information search, establishment of quality information center using bookmark, sites related quality by fields, journal sites related quality, sites related quality award,and web sites of the highest business.

  9. The economical contracting management in Agricultural Cooperatives: tools for evaluating their performance.

    Directory of Open Access Journals (Sweden)

    Rafael Enrique Viña Echevarría

    2014-06-01

    Full Text Available The economic and management contracts involve strategic actions, legal and operational purposes that make possible to convert the goal of an organization on results that express the fulfillment of the mandates and satisfies customers on the basis of the duties and obligations set out in the negotiating document. This article aims to get inside into the performance evaluation of the management of the recruitment of Agricultural Cooperatives and to reflex about the insufficiencies evidenced in this process. To which we developed a theoretical valuation and economic procurement praxiological showing a group of deficiencies that have impacted in the contracts management The study was able to obtain, process, analyze, interpret and argue the problems associated with economic contracting and justify the need to propose a system of indicators to assess recruitment management Agricultural Cooperatives in the province of Sancti Spiritus, the results revealed the ineffectiveness of the process and the negative impact on the productive base.

  10. Quality management using TQC

    International Nuclear Information System (INIS)

    Hwang, Ui Cheol

    1992-03-01

    This book introduces conception on quality and quality management, standardization with meaning, principle and structure of it, and system, company standard for quality management, quality management on planning, organization and operation, quality guarantee with system evaluation and information, policy management on policy, purpose and daily life, quality management on research and development infrastructure, quality management on design and production facilities, statistical method of quality management, control chart and process capability.

  11. Management of Contract Waivers and Deviations for Defense Systems

    National Research Council Canada - National Science Library

    1998-01-01

    This report is the fourth and final in a series of reports resulting from our audit of management of contract waivers and deviations for Defense systems and summarizes our overall evaluation. Report...

  12. Measuring Healthcare Providers' Performances Within Managed Competition Using Multidimensional Quality and Cost Indicators.

    Science.gov (United States)

    Portrait, France R M; van der Galiën, Onno; Van den Berg, Bernard

    2016-04-01

    The Dutch healthcare system is in transition towards managed competition. In theory, a system of managed competition involves incentives for quality and efficiency of provided care. This is mainly because health insurers contract on behalf of their clients with healthcare providers on, potentially, quality and costs. The paper develops a strategy to comprehensively analyse available multidimensional data on quality and costs to assess and report on the relative performance of healthcare providers within managed competition. We had access to individual information on 2409 clients of 19 Dutch diabetes care groups on a broad range of (outcome and process related) quality and cost indicators. We carried out a cost-consequences analysis and corrected for differences in case mix to reduce incentives for risk selection by healthcare providers. There is substantial heterogeneity between diabetes care groups' performances as measured using multidimensional indicators on quality and costs. Better quality diabetes care can be achieved with lower or higher costs. Routine monitoring using multidimensional data on quality and costs merged at the individual level would allow a systematic and comprehensive analysis of healthcare providers' performances within managed competition. Copyright © 2015 John Wiley & Sons, Ltd.

  13. The integrated supplier: key to cost management and multi-franchise capitation contracting.

    Science.gov (United States)

    Schuweiler, R C

    1996-05-01

    Capitation...most healthcare providers do not work under it, comprehend it, or even want it, yet supply capitation contracting seminars are popping up everywhere creating the feeling that the bandwagon is leaving, and it might be time to get on board. Not true. Supply capitation is not for all organizations. Capitation contracting is not easy and there are not many successful models to help the uninitiated. If a panacea is sought for reducing supply costs, capitation is only one component of a systematic strategy to reduce materiel costs. This article suggests a direction using the Group Health Materiel Management (Group Health Cooperative of Puget Sound, WA) experience as a point of reference. It advocates a systematic approach that focuses on expense reduction in: cost of goods, holding cost of inventory, labor cost associated with all materiel processes, distribution cost (transportation and par stock pick, pack, and replenishment), product utilization, variation in product standards, and waste stream byproducts. At Group Health (GH) these issues are primarily addressed through the use of: information systems, supplier certification/selection processes, group purchasing compliance, supply channel management, supply capitation contracting programs, standardization, and utilization management. Because of managed care organizational structure, Group Health Cooperative supply capitation contracting, as performed at GH, is discussed not as a quick fix solution but in the spirit of sharing our experience with others who may be considering it as a cost savings tactic in the context of a broad-based materiel management strategy. This article highlights the experiences of GH beginning with materiel management's business process assumptions toward multiple-franchise supply capitation.

  14. Quality management certification for the nuclear industry

    International Nuclear Information System (INIS)

    Wilmer, T.J.

    1993-01-01

    Historically for safety critical items, the United Kingdom nuclear companies either conducted their own inspection and audit of suppliers or sub-contracted staff to do so on their behalf. However, it is becoming unrealistic for these services to be undertaken in-house for economic reasons. The power industry is looking outside its own immediate expertise to that of 3rd Party Certification Bodies. There is a danger of introducing an element of risk unless the Certification Body really does understand the industry and its requirements. The Nuclear Installations Inspectorate (NII) makes it mandatory for nuclear installations to have in place Quality management systems that meet the requirements of BS 5882. This standard requires the use of quality assurance programmes and a greater degree of understanding of nuclear regulations and codes of practice than is required by BS 5750. This is a very significant factor, recognising as it does the need to harmonise the management interface between an operator of a nuclear installation and suppliers to that same installation. (author)

  15. Quality management tool

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Tae Hun

    2011-09-15

    This book introduces basic conception of quality with characteristic, price, cost, and function, basic conception on quality management, introduction and operation of quality management, quality guaranteed and claim like handling of claim of goods, standards, and quality guaranteed method, basic tools of quality management such as Pareto diagram, characteristic diagram, cause-and-effect, fish born diagram check sheet histogram scatter diagram graph and stratification new seven tools of QC, quality deployment function and measurement system.

  16. Quality management tool

    International Nuclear Information System (INIS)

    Lee, Tae Hun

    2011-09-01

    This book introduces basic conception of quality with characteristic, price, cost, and function, basic conception on quality management, introduction and operation of quality management, quality guaranteed and claim like handling of claim of goods, standards, and quality guaranteed method, basic tools of quality management such as Pareto diagram, characteristic diagram, cause-and-effect, fish born diagram check sheet histogram scatter diagram graph and stratification new seven tools of QC, quality deployment function and measurement system.

  17. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  18. THE IMPACT OF PSYCHOLOGICAL CONTRACT ON RELATIONSHIP QUALITY IN FINANCIAL SERVICES MARKET

    Directory of Open Access Journals (Sweden)

    Mario Pepur

    2013-02-01

    Full Text Available The theoretical arguments of the psychological contracts arise from the social exchange theory. According to this theory, all the parties involved in any type of relationships want to build a relationship based on mutual respect and fairness. The main goal of this paper is to explore the influence that psychological contracts have on the quality of the business-to-business relationship in the financial services market. The research conducted in this paper continued the pioneer work of Kingshott and Pecotich (2007 and by extending their conceptual model it provided the theoretical and practical insights specific to the business-to-business market. In the empirical part of the paper, the relationship between hotels and financial institutions in the Republic of Croatia is tested using the canonical correlation analysis. The results of the analysis confirm that the psychological contracts have an influence on the relationship quality between the partners in the financial services market.

  19. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  20. Relationships between Medicare Advantage contract characteristics and quality-of-care ratings: an observational analysis of Medicare Advantage star ratings.

    Science.gov (United States)

    Xu, Peng; Burgess, James F; Cabral, Howard; Soria-Saucedo, Rene; Kazis, Lewis E

    2015-03-03

    The Centers for Medicare & Medicaid Services (CMS) publishes star ratings on Medicare Advantage (MA) contracts to measure plan quality of care with implications for reimbursement and bonuses. To investigate whether MA contract characteristics are associated with quality of care through the Medicare plan star ratings. Retrospective study of MA star ratings in 2010. Unadjusted and adjusted multivariable linear regression models assessed the relationship between 5-star rating summary scores and plan characteristics. CMS MA contracts nationally. 409 (71%) of a total of 575 MA contracts, covering 10.56 million Medicare beneficiaries (90% of the MA population) in the United States in 2010. The MA quality ratings summary score (stars range from 1 to 5) is a quality measure based on 36 indicators related to processes of care, health outcomes, access to care, and beneficiary satisfaction. Nonprofit, larger, and older MA contracts were more likely to receive higher star ratings. Star ratings ranged from 2 to 5. Nonprofit contracts received an average 0.55 (95% CI, 0.42 to 0.67) higher star ratings than for-profit contracts (P  star ratings than for-profit contracts. When comparing health plans in the future, the CMS should give increasing attention to for-profit plans with lower quality ratings and consider developing programs to assist newer and smaller plans in improving their care for Medicare beneficiaries. None.

  1. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  2. Trust-based or performance-based management: a study of employment contracting in hospitals.

    Science.gov (United States)

    Pettersen, Inger Johanne

    2011-01-01

    Hospitals are frequently changing managerial practices due to numerous public sector reforms taking place. In general, these reforms include the making and monitoring of contracts that regulate relations between the hospitals and their professional staffs. The aim of this paper is to discuss some main characteristics of the contracts that regulate the perceived relations between physicians as employees and the public hospital as employer. The theoretical framework is based on a contract theory approach. The empirical data is based on survey data from full-time employed physicians in the medical and surgical divisions in one of the largest university hospitals in Norway. This study shows that perceived obligations and psychological contracts indicate high degree of relational contracts between the hospital and the physicians. These socio-cultural elements should be recognized as important mechanisms of coordination and communication when policy makers and hospital managers are designing hospital management control systems. Copyright © 2009 John Wiley & Sons, Ltd.

  3. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  4. Quality management and quality assurance

    International Nuclear Information System (INIS)

    Pieroni, N.

    1991-01-01

    The main common difficulties are presented found in the implementation of effective Quality Management and Quality Assurance Programmes, based on the recommendations of the IAEA International Nuclear Safety Advisory Group, the information collected by the IAEA experts participating in its meetings, and the results of the IAEA Operational Safety Review Team missions. The difficulties were identified in several areas. The most relevant root causes can be characterized as lack of understanding of quality principles and difficulty in implementation by the responsible management. The IAEA programme is described attempting to provide advice and support in the implementation of an effective quality programme through a number of activities including: preparation of practical guidelines, training programmes for management personnel, assistance in building up qualified manpower, and promoting the quest for excellence through the exchange of experience in the implementation of effective Quality Management and Quality Assurance Programmes in nuclear power plants with good performance records. (Z.S.)

  5. 48 CFR 46.707 - Pricing aspects of fixed-price incentive contract warranties.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing aspects of fixed-price incentive contract warranties. 46.707 Section 46.707 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 46.707 Pricing aspects of...

  6. [The Brazilian National Health Surveillance Agency performance evaluation at the management contract model].

    Science.gov (United States)

    Moreira, Elka Maltez de Miranda; Costa, Ediná Alves

    2010-11-01

    The Brazilian National Health Surveillance Agency (Anvisa) is supervised by the Ministry of Health by means of a management contract, a performance evaluation tool. This case study was aimed at describing and analyzing Anvisa's performance evaluation model based on the agency's institutional purpose, according to the following analytical categories: the management contract formalization, evaluation tools, evaluators and institutional performance. Semi-structured interviews and document analysis revealed that Anvisa signed only one management contract with the Ministry of Health in 1999, updated by four additive terms. The Collegiate Board of Directors and the Advisory Center for Strategic Management play the role of Anvisa's internal evaluators and an Assessing Committee, comprising the Ministry of Health, constitutes its external evaluator. Three phases were identified in the evaluation model: the structuring of the new management model (1999-2000), legitimation regarding the productive segment (2001-2004) and widespread legitimation (2005). The best performance was presented in 2000 (86.05%) and the worst in 2004 (40.00%). The evaluation model was shown to have contributed little towards the agency's institutional purpose and the effectiveness measurement of the implemented actions.

  7. Management in general practice: the challenge of the new General Medical Services contract.

    Science.gov (United States)

    Checkland, Kath

    2004-10-01

    Managers in general practice perform a variety of roles, from purely administrative to higher-level strategic planning. There has been little research investigating in detail how they perform these roles and the problems that they encounter. The new General Medical Services (GMS) contract contains new management challenges and it is not clear how practices will meet these. To improve understanding of the roles performed by managers in general practice and to consider the implications of this for the implementation of the new GMS contract. In-depth qualitative case studies covering the period before and immediately after the vote in favour of the new GMS contract. Three general practices in England, chosen using purposeful sampling. Semi-structured interviews with all clinical and managerial personnel in each practice, participant and non-participant observation, and examination of documents. Understanding about what constitutes the legitimate role of managers in general practice varies both within and between practices. Those practices in the study that employed a manager to work at a strategic level with input into the direction of the organisation demonstrated significant problems with this in practice. These included lack of clarity about what the legitimate role of the manager involved, problems relating to the authority of managers in the context of a partnership, and lack of time available to them to do higher-level work. In addition, general practitioners (GPs) were not confident about their ability to manage their managers' performance. The new GMS contract will place significant demands on practice management. These results suggest that it cannot be assumed that simply employing a manager with high-level skills will enable these demands to be met; there must first be clarity about what the manager should be doing, and attention must be directed at questions about the legitimacy enjoyed by such a manager, the limits of his or her authority, and the

  8. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  9. Two-year impact of the alternative quality contract on pediatric health care quality and spending.

    Science.gov (United States)

    Chien, Alyna T; Song, Zirui; Chernew, Michael E; Landon, Bruce E; McNeil, Barbara J; Safran, Dana G; Schuster, Mark A

    2014-01-01

    To examine the 2-year effect of Blue Cross Blue Shield of Massachusetts' global budget arrangement, the Alternative Quality Contract (AQC), on pediatric quality and spending for children with special health care needs (CSHCN) and non-CSHCN. Using a difference-in-differences approach, we compared quality and spending trends for 126,975 unique 0- to 21-year-olds receiving care from AQC groups with 415,331 propensity-matched patients receiving care from non-AQC groups; 23% of enrollees were CSHCN. We compared quality and spending pre (2006-2008) and post (2009-2010) AQC implementation, adjusting analyses for age, gender, health risk score, and secular trends. Pediatric outcome measures included 4 preventive and 2 acute care measures tied to pay-for-performance (P4P), 3 asthma and 2 attention-deficit/hyperactivity disorder quality measures not tied to P4P, and average total annual medical spending. During the first 2 years of the AQC, pediatric care quality tied to P4P increased by +1.8% for CSHCN (P < .001) and +1.2% for non-CSHCN (P < .001) for AQC versus non-AQC groups; quality measures not tied to P4P showed no significant changes. Average total annual medical spending was ~5 times greater for CSHCN than non-CSHCN; there was no significant impact of the AQC on spending trends for children. During the first 2 years of the contract, the AQC had a small but significant positive effect on pediatric preventive care quality tied to P4P; this effect was greater for CSHCN than non-CSHCN. However, it did not significantly influence (positively or negatively) CSHCN measures not tied to P4P or affect per capita spending for either group.

  10. Risk management and oil trading contracts

    International Nuclear Information System (INIS)

    Sas, B.

    1992-01-01

    The oil market provides an excellent case study for an analysis of the commodity trading risks and the development of contractual instruments and market structures to meet these risks. The paper identifies the main risks, namely performance, credit/payment, price, regulatory, fiscal, and ''trading'' risk. A conceptual framework provides the basis to trace the evolution of the risk management instruments from relational (e.g. long-term), through ''transactional'' (e.g. spot and forwards) to ''institutional'' (e.g. futures and options) and finally ''pricing'' (e.g. swaps and trigger pricing) contracts. (author)

  11. Government Health Care Contract Incentives: Making Managed Health Care Work in Federal Government Procurements

    National Research Council Canada - National Science Library

    Teskey, Mark S

    1999-01-01

    Contracting for managed health care systems is a complex undertaking. The current TRICARE contracts captured all the important parts of the system and ensured detailed compliance with the many system requirements...

  12. Customer relationship management in the contract pharmaceutical industry: an exploratory study for measuring success.

    Science.gov (United States)

    Kros, John F; Nadler, Scott; Molis, Justin

    2007-01-01

    Managing customer relationships is a very important issue in business-to-business markets. This research investigates the growing number of available resources defining Customer Relationship Management (CRM) efforts, and how they are being applied within the Contract Pharmaceutical Manufacturing industry. Exploratory study results using face-to-face and telephone questionnaires based on four criteria for rating a company's CRM efforts are presented. Data was collected from large Contract Pharmaceutical Manufacturing companies in the US market. The results and conclusions are discussed relating how the Contract Pharmaceutical Manufacturing industry is implementing CRM including some potential steps to take when considering a CRM initiative.

  13. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  14. Story quality management

    International Nuclear Information System (INIS)

    1976-12-01

    This book is written to explain quality management using stories, which have each story about quality management. The titles of stories are way to tell the meaning in mind, mom, house wife's meal costs a great deal, good bye digestive medicine, beans cooked in soy sauce, wedding and space rocket, each story is used to give descriptions of quality management like procedure and decision for division of labor, quality guaranteed and histogram.

  15. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  16. Managing Reputation in Contract-Based Distributed Systems

    Science.gov (United States)

    Baldoni, Roberto; Doria, Luca; Lodi, Giorgia; Querzoni, Leonardo

    In industry practice, bilateral agreements are established between providers and consumers of services in order to regulate their business relationships. In particular, Quality of Service (QoS) requirements are specified in those agreements in the form of legally binding contracts named Service Level Agreements (SLA). Meeting SLAs allows providers to be seen in the eyes of their clients, credible, reliable, and trustworthy. This contributes to augment their reputation that can be considered an important and competitive advantage for creating potentially new business opportunities.

  17. Super Energy Savings Performance Contracts: Federal Energy Management Program (FEMP) Program Overview (revision)

    International Nuclear Information System (INIS)

    Pitchford, P.

    2001-01-01

    This four-page publication describes the U.S. Department of Energy's (DOE's) streamlined energy savings performance contracting, or ''Super ESPC,'' process, which is managed by DOE's Federal Energy Management Program (FEMP). Under a Super ESPC, a qualifying energy service company (ESCO) from the private sector pays for energy efficiency improvements or advanced renewable energy technologies (e.g., photovoltaic systems, wind turbines, or geothermal heat pumps, among others) for a facility of a government agency. The ESCO is then repaid over time from the agency's resulting energy cost savings. Delivery orders under these contracts specify the level of performance (energy savings) and the repayment schedule; the contract term can be up to 25 years, although many Super ESPCs are for about 10 years or less

  18. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth; Smulders, Peter; Taris, Toon W

    2012-10-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract, temporary contract with prospect of permanent work, fixed-term contract, temporary agency contract and on-call contract) in the quality of working life, job insecurity, health and work-related attitudes and (2) investigate whether these latter contract group differences in health and work-related attitudes can be explained by differences in the quality of working life and/or job insecurity. Data were collected from the Netherlands Working Conditions Survey 2008 (N = 21,639), and Hypotheses were tested using analysis of variance and cross-table analysis. Temporary work was associated with fewer task demands and lower autonomy and was more often passive or high-strain work, while permanent work was more often active work. Except for on-call work, temporary work was more insecure and associated with worse health and work-related attitude scores than permanent work. Finally, the quality of working life and job insecurity partly accounted for most contract differences in work-related attitudes but not in health. Especially agency workers have a lower health status and worse work-related attitudes. Job redesign measures regarding their quality of working life and job insecurity are recommended.

  19. MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

    International Nuclear Information System (INIS)

    Kronvall, C.M.

    2011-01-01

    In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D and D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

  20. Consolidating staff augmentation contracts improves teamwork and reduces costs

    International Nuclear Information System (INIS)

    Townsend, J.; Sibilla, L.; Gregovich, J.W.

    1991-01-01

    Nuclear power plants have traditionally used multiple contracting firms to provide temporary staff augmentation personnel primarily because of two perceptions: (1) managers believe they have greater access to a higher quality, readily available pool of applicants. (2) using multiple contractors inherently keeps costs down as a result of several competitors submitting resumes for the same position. This paper provides information, based on the experiences of a leading nuclear power plant, that disproves these perceptions. It explains why consolidating several contracts for professional and technical classifications (excluding craft labor and refueling personnel) and competitively bidding and awarding the contract to a single contracting firm promotes teamwork and reduces costs

  1. ENUSA: from the quality management to the management quality

    International Nuclear Information System (INIS)

    Alvarez, P.; Artieda, J. I.; Prieto, M.

    2003-01-01

    This article reviews how the idea of quality has evolved throughout recent history. The most modern management models such as EFQM and the most advanced continuous improvement methodologies such as 6 Sigma are no more than links in the chain of evolution of the quality concept. The title clearly synthesizes the idea to be conveyed; instead of considering quality as just one more activity, it must be a core, appreciable part of company management. (Author)

  2. The new Facilities Management contract at CERN from 1st July 2002

    CERN Document Server

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent cont...

  3. THE NEW FACILITIES MANAGEMENT CONTRACT AT CERN FROM 1st JULY 2002

    CERN Multimedia

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent contro...

  4. [The use of management contracts and professional incentives in the public health sector].

    Science.gov (United States)

    Ditterich, Rafael Gomes; Moysés, Simone Tetu; Moysés, Samuel Jorge

    2012-04-01

    Results-based management is a cornerstone of reform in public administration, including the health field, and has become the basis for other innovations such as the institutionalization of management contracts and the use of professional incentives. This review article aims to introduce and discuss the use of such management contracts in the public health sector. Management by results has developed means and tools that highlight the importance of shared responsibility and mutual commitment between workers and management-level directors. Thus, preset goals are negotiated among all the stakeholders and are evaluated periodically in order to grant professional incentives. It is necessary to improve the mechanisms for control and observation, to more precisely determine the healthcare and management indicators and their patterns, to train stakeholders in designing the plan, and to improve the use of professional incentives in order to effectively increase accountability vis-à-vis the desired results.

  5. COST QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vitanova Gordana

    2009-05-01

    Full Text Available Within the contemporary economic conditions, enterprises might achieve a competitive advantage if only they sell goods and services with high quality and lower prices. Customers, usually, prefer quality goods with acceptable prices, while such goods create reputation with the particular brand. The perfect control system is necessary to achieve a high quality product, which the cost quality management is considered to be an indispensable part in. The cost quality is nevertheless created to ensure that customers’ requirements are being appropriately attained. The most important objective of quality costs controlling is to assist the management in enhancing the product’s value permanently. The superior cost quality control system helps the management to achieve other strategic objectives, such as: producing goods with acceptable costs and deliver the products to their customers in time.

  6. Quality Management in Education.

    Science.gov (United States)

    Tribus, Myron

    When transferring the methods of quality management from industry to academia, there are important differences that must be considered. This paper describes the differences between traditional management and quality management, and shows how Deming's principles of Total Quality Management (TQM) can be applied to education. Some of these principles…

  7. Total Quality Management – A Way to Manage Organizations Centred on Quality

    Directory of Open Access Journals (Sweden)

    Vasile Dinu

    2017-11-01

    Full Text Available Following the consolidation and maturation of quality management, the evolution of this concept has demonstrated that its most advanced form has become Total Quality Management (TQM. Total Quality Management is a way of leading quality-centred organizations, as this is the main driving force that can direct the organization on the way to excellence in business. At the same time, it is based on the participation of all members, pursuing the efficiency of the long-term activity, leading to the effective satisfaction of the client, as well as to the benefits for all members of organization and for society. Total Quality Management is an approach that aims to continuously improve quality and performance to meet or exceed customer expectations. This can be accomplished by integrating all the functions and performance-related processes in a company. TQM targets all the quality improvement measures used by a company, including quality design and development, control, management, continuous improvement and quality assurance. In other words, TQM considers all quality measures at all levels and compartments that involve all employees in order to obtain long-term benefits

  8. Implementation and implication of total quality management on client- contractor relationship in residential projects

    Science.gov (United States)

    Murali, Swetha; Ponmalar, V.

    2017-07-01

    To make innovation and continuous improvement as a norm, some traditional practices must become unlearnt. Change for growth and competitiveness are required for sustainability for any profitable business such as the construction industry. The leading companies are willing to implement Total Quality Management (TQM) principles, to realise potential advantages and improve growth and efficiency. Ironically, researches recollected quality as the most significant provider for competitive advantage in industrial leadership. The two objectives of this paper are 1) Identify TQM effectiveness in residential projects and 2) Identify the client satisfaction/dissatisfaction areas using Analytical Hierarchy Process (AHP) and suggest effective mitigate measures. Using statistical survey techniques like set of questionnaire survey, it is observed that total quality management was applied in some leading successful organization to an extent. The main attributes for quality achievement can be defined as teamwork and better communication with single agreed goal between client and contractor. Onsite safety is a paramount attribute in the identifying quality within the residential projects. It was noticed that the process based quality methods such as onsite safe working condition; safe management system and modern engineering process safety controls etc. as interlinked functions. Training and effective communication with all stakeholders on quality management principles is essential for effective quality work. Late Only through effective TQM principles companies can avoid some contract litigations with an increased client satisfaction Index.

  9. Cutting out the middleman: physicians can contract directly with employers--a viable alternative to adversarial managed care agreements.

    Science.gov (United States)

    Lester, Howard

    2002-01-01

    HMOs, PPOs, and other managed care "middlemen" control the means by which most physicians do business with employers. As physicians face dwindling reimbursements, greater practice restrictions, and increased pressure to sign adversarial middleman contracts, interest in direct contracting has grown. This article introduces direct contracting as an important alternative to commercial managed care agreements; cites the key advantages and process of direct contracting; and offers practical recommendations for helping physician practices successfully negotiate direct physician/employer agreements.

  10. 41 CFR 51-6.11 - Quality complaints.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Quality complaints. 51-6.11 Section 51-6.11 Public Contracts and Property Management Other Provisions Relating to Public... commodities received from Defense Logistics Agency supply centers, General Services Administration supply...

  11. Population-based contracting (population health): part II.

    Science.gov (United States)

    Jacofsky, D J

    2017-11-01

    Modern healthcare contracting is shifting the responsibility for improving quality, enhancing community health and controlling the total cost of care for patient populations from payers to providers. Population-based contracting involves capitated risk taken across an entire population, such that any included services within the contract are paid for by the risk-bearing entity throughout the term of the agreement. Under such contracts, a risk-bearing entity, which may be a provider group, a hospital or another payer, administers the contract and assumes risk for contractually defined services. These contracts can be structured in various ways, from professional fee capitation to full global per member per month diagnosis-based risk. The entity contracting with the payer must have downstream network contracts to provide the care and facilities that it has agreed to provide. Population health is a very powerful model to reduce waste and costs. It requires a deep understanding of the nuances of such contracting and the appropriate infrastructure to manage both networks and risk. Cite this article: Bone Joint J 2017;99-B:1431-4. ©2017 The British Editorial Society of Bone & Joint Surgery.

  12. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    Science.gov (United States)

    2016-08-30

    Sea Systems issue guidance to contracting officers to obtain a quality assurance surveillance plan for all service contracts, and ensure that the...prepare a quality assurance surveillance plan (QASP) for service contracts in order to facilitate assessment of contractor performance.12 Furthermore...that the contracting activities received and paid for goods or services that did not meet contract performance standards. At the time of the audit

  13. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  14. The role of the psychological contract in the motivation of nurses.

    Science.gov (United States)

    Corder, Emma; Ronnie, Linda

    2018-02-05

    Purpose Although private health care is regarded as providing a premium quality experience for both patients and staff alike, it is not without its daily challenges for health professionals. This study aims to explore the psychological contract of nurses to develop a greater understanding of how employee-employer interaction impacts motivation levels. Design/methodology/approach Data were gathered through semi-structured interviews with thirteen nurses at a private hospital in South Africa. Five nursing managers were interviewed to provide a management perspective. Thematic analysis was used to identify the salient elements of the psychological contract and to establish connections with motivational features. Findings The psychological contract of nurses was balanced in nature, contained predominantly relational elements and was characterized by the need for manager support, leadership and autonomy. Motivation was a by-product of fulfilment and was enhanced by a combination of tangible and intangible rewards. Practical implications Nursing managers should recognize their role in caring for the wellbeing of their staff and should be trained accordingly. Equipping nurses with the necessary tools to work autonomously, as well as acknowledging their skills, will stimulate confidence and improve motivation. Originality/value This study makes an important contribution to the existing literature on the psychological contract of nurses within the health-care system. It provides insight into relationship-based mechanisms that can be used to improve the motivation of nurses and thus impact the overall quality of patient care.

  15. Employment contracts: Cross-sectional and longitudinal relations with quality of working life, health and well-being

    NARCIS (Netherlands)

    Kompier, M.; Ybema, J.F.; Janssen, J.; Taris, T.

    2009-01-01

    Objectives: The aim of this study was to enhance (i) insight in the relationship between different types of employment contract and the quality of working life, health and well-being, and (ii) our causal understanding of these relationships by comparing employees whose contract type changes across

  16. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  17. Report of the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    The report from the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators on the future management and disposition of the power purchase agreements entered into by Ontario Hydro with each non-utility generator (a NUG) is discussed. The integration of NUG contracts into a restructured competitive electricity market, the complexity of the contracts and the disparity of size, resources and approach to the integration exercise of the NUGs produces to an array of challenging issues. The committee identified three alternative strategies for dealing with NUG contracts in Ontario. The first is to use the independent Electricity Market Operator as a purely passive contract holder and above-market cost collection agent. The second is to make the Ontario Electricity Financial Corporation (OEFC) the contract holder and use a commercially oriented manager to administer the NUG contracts. This would minimize above-market costs and to advise on buyouts, compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a single pooled Competition Transfer Charge. The third is to make the OEFC the contract holder, use a commercially oriented manager to administer the NUG contracts, to minimize above-market costs and to advise on buyouts. The OEFC would compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a pooled CTC. The IMO would be used to collect the above-market NUG contract part of the pooled CTC as agent of the contract holder, in a contract uplift that would, like the levy in the first strategy, be charged to wholesale market participants and be included in rates paid by domestic end-use customers.1

  18. 76 FR 14543 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2011-03-16

    ..., Sequence 1] RIN 9000-AL78 Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement... other than firm-fixed-price contracts (e.g., cost-reimbursement, time-and-material, and labor-hour...-reimbursement contracts and identifies the following three areas that the Defense Acquisition Regulation Council...

  19. MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

    Energy Technology Data Exchange (ETDEWEB)

    KRONVALL CM

    2011-01-14

    In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

  20. Pan-European management of electricity portfolios: Risks and opportunities of contract bundling

    International Nuclear Information System (INIS)

    Gampert, Markus; Madlener, Reinhard

    2011-01-01

    Due to the liberalization of energy markets in the European Union, today's European utilities not only focus on electricity supply, but also offer exchange-traded 'structured products' or portfolio management for unbundling financial and physical risk positions. Many utilities are only able to provide these services in their domestic markets. In a globalized economy, the need for a centrally organized pan-European portfolio management has arisen, as it allows a simplified commodity sourcing in combination with an optimized risk management. In this paper, we examine the challenges to be overcome for establishing a European-wide bundling of electricity contracts. For this purpose, a case study based on the business perspective of RWE Supply and Trading in Central and Eastern Europe is carried out. In a first step, we analyze general requirements for a pan-European bundling of electricity contracts. Then, RWE's situation in Europe is examined, based on which we finally propose a concept to meet customer demands in Central and Eastern Europe. - Research highlights: → Analysis of electricity market liberalization in Central and Eastern Europe. → Identification of requirements and problems for pan-European bundling of contracts. → Case study based on RWE Supply and Trading perspective in Central and Eastern Europe. → Model development for pan-European unbundling of financial/physical risk positions.

  1. Management of Liquidity Risk Using Foreign Exchange Swap Contracts

    Directory of Open Access Journals (Sweden)

    Ivica Prga

    2009-12-01

    Full Text Available Croatian banks, like the other world banks, are exposed to liquidity risk. This is very significant question to them, particularly in this complex and crisis time. Therefore, the Croatian banks pay much attention to the management of liquidity. In these attempts, the banks use various derivative financial instruments of which the foreign exchange swap contracts are particularly remarkable.

  2. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  3. Exploration and practice on contract management of Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Yonggang

    2002-01-01

    In the market economy, Daya Bay Nuclear Power Station needs to out source or allow to suppliers among industries, while concentrating its core competitive capability, for safely and stable operation. By evaluating the features of contract management in Daya Bay Nuclear Power Station, set up the organization and process of the supply management

  4. Developing a framework of, and quality indicators for, general practice management in Europe.

    Science.gov (United States)

    Engels, Yvonne; Campbell, Stephen; Dautzenberg, Maaike; van den Hombergh, Pieter; Brinkmann, Henrik; Szécsényi, Joachim; Falcoff, Hector; Seuntjens, Luc; Kuenzi, Beat; Grol, Richard

    2005-04-01

    To develop a framework for general practice management made up of quality indicators shared by six European countries. Two-round postal Delphi questionnaire in the setting of general practice in Belgium, France, Germany, The Netherlands, Switzerland and the United Kingdom. Six national expert panels, each consisting of 10 members, primarily primary care practitioners and experts in the field of quality in primary care participated in the study. The main outcome measures were: (a) a European framework with indicators for the organization of primary care; and (b) ratings of the face validity of the usefulness of the indicators by expert panels in six countries. Agreement was reached about a definition of practice management across five domains (infrastructure, staff, information, finance, and quality and safety), and a common set of indicators for the organization of general practice. The panellist response rate was 95%. Sixty-two indicators (37%) were rated face valid by all six panels. Examples include out of hours service, accessibility, the content of doctors' bags and staff involvement in quality improvement. No indicators were rated invalid by all six panels. It proved to be possible to develop a European set of indicators for assessing the quality of practice management, despite the differences in health care systems and cultures in the six different countries. These indicators will now be used in a quality assessment procedure of practice management in nine European countries. While organizational indicators are part of the new GMS contract in the UK, this research shows that many practice management issues within primary care are also of relevance in other European countries.

  5. Learning in a self-managed management career : the relation between managers' HRD-patterns, psychological career contracts and mobility perpectives

    NARCIS (Netherlands)

    Lankhuijzen, E.S.K.

    2002-01-01

    This thesis focuses on the significance of managers HRD-activities (learning activities) in modern career contexts. Based on literature study and several pre-studies, a conceptual research model was developed containing three main elements: HRD-pattern, psychological career contract and mobility

  6. Quality management in industry

    International Nuclear Information System (INIS)

    Saegesser, R.

    1992-01-01

    Using the example of the introduction of quality management in industry, the procedure in the Sulzer Concern is described. After an historical review, the principles of quality management drawn up at Sulzer, their implementation, the training from top to bottom and quality assurance used as an instrument of quality management are described. Supporting measures and the periphery are also mentioned. Finally, the initial experience gained from this introduction, which is not yet complete, is presented. 4 figs

  7. [Quality Manager 2.0 in hospitals: A practical guidance for executive managers, medical directors, senior consultants, nurse managers and practicing quality managers].

    Science.gov (United States)

    Pilz, Stefan; Hülsmann, Sylvia; Michallik, Stefan; Rimbach-Schurig, Monika; Schollmeier, Margarita; Sommerhoff, Benedikt; Weßling, Adelheid

    2013-01-01

    Aiming at the development of perspectives and recommendations for modern quality management in health services the GQMG conducted a study on the role and self-conception of quality managers in hospitals. It seems obvious that the effectiveness of quality management clearly depends on the executive board's skilful installation of quality management, their support of quality managers and, particularly in larger-sized institutions on the coordination of staff units and cross-sectional functions.(As supplied by author). Copyright © 2013. Published by Elsevier GmbH.

  8. The ‘Alternative Quality Contract’ in Massachusetts, Based on Global Budgets, Lowered Medical Spending and Improved Quality

    Science.gov (United States)

    Song, Zirui; Safran, Dana Gelb; Landon, Bruce E.; Landrum, Mary Beth; He, Yulei; Mechanic, Robert E.; Day, Matthew P.; Chernew, Michael E.

    2012-01-01

    Seven provider organizations in Massachusetts entered the Blue Cross Blue Shield Alternative Quality Contract in 2009, followed by four more organizations in 2010. This contract, based on a global budget and pay-for-performance for achieving certain quality benchmarks, places providers at risk for excessive spending and rewards them for quality, similar to the new Pioneer Accountable Care Organizations in Medicare. We analyzed changes in spending and quality associated with the Alternative Quality Contract and found that the rate of increase in spending slowed compared to control groups. Overall, participation in the contract over two years led to a savings of 3.3% (1.9% in year-1, 3.3% in year-2) compared to spending in groups not participating in the contract. The savings were even higher for groups whose previous experience had been only in fee-for-service contracting. Such groups’ quarterly savings over two years averaged 8.2% (6.3% in year-1, 9.9% in year-2). Quality of care also improved within organizations participating in the Alternative Quality Contract compared to control organizations in both years. Chronic care management, adult preventive care, and pediatric care improved from year 1 to year 2 within the contracting groups. These results suggest that global budgets coupled with pay-for-performance can begin to slow the underlying growth in medical spending while improving quality. PMID:22786651

  9. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  10. Electricity market risk management using forward contracts with bilateral options

    International Nuclear Information System (INIS)

    Chung, T.S.; Yu, C.W.; Wong, K.P.; Zhang, S.H.

    2003-01-01

    Extreme short-term price volatility in competitive electricity markets creates the need for risk management arrangements. A new electricity forward contract with bilateral financial options is introduced, which allows both seller and buyer to take advantage of flexibility in generation and consumption to obtain monetary benefits while simultaneously removing the risk of market price fluctuations. The option theory is incorporated to formulate the contract price. The strike prices of options are derived from solving an equilibrium model in which both the buyer and the seller aim to maximise their own profit. Theoretical analysis shows that the proposed optional forward contract presents a more equitable and reasonable payoff structure that allows the buyer and seller to earn a larger overall expected benefit, and the contractual arrangement supports efficiency in economic dispatch of electricity production and consumption. The insights obtained from these results will be helpful to participants in the contractual decision-making process. (Author)

  11. The reliability-quality relationship for quality systems and quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg; Rahaman, Faiad; Urban, Jason M

    2012-01-01

    Engineering reliability typically refers to the probability that a system, or any of its components, will perform a required function for a stated period of time and under specified operating conditions. As such, reliability is inextricably linked with time-dependent quality concepts, such as maintaining a state of control and predicting the chances of losses from failures for quality risk management. Two popular current good manufacturing practice (cGMP) and quality risk management tools, failure mode and effects analysis (FMEA) and root cause analysis (RCA) are examples of engineering reliability evaluations that link reliability with quality and risk. Current concepts in pharmaceutical quality and quality management systems call for more predictive systems for maintaining quality; yet, the current pharmaceutical manufacturing literature and guidelines are curiously silent on engineering quality. This commentary discusses the meaning of engineering reliability while linking the concept to quality systems and quality risk management. The essay also discusses the difference between engineering reliability and statistical (assay) reliability. The assurance of quality in a pharmaceutical product is no longer measured only "after the fact" of manufacturing. Rather, concepts of quality systems and quality risk management call for designing quality assurance into all stages of the pharmaceutical product life cycle. Interestingly, most assays for quality are essentially static and inform product quality over the life cycle only by being repeated over time. Engineering process reliability is the fundamental concept that is meant to anticipate quality failures over the life cycle of the product. Reliability is a well-developed theory and practice for other types of manufactured products and manufacturing processes. Thus, it is well known to be an appropriate index of manufactured product quality. This essay discusses the meaning of reliability and its linkages with quality

  12. Total Quality Management in a Knowledge Management Perspective.

    Science.gov (United States)

    Johannsen, Carl Gustav

    2000-01-01

    Presents theoretical considerations on both similarities and differences between information management and knowledge management and presents a conceptual model of basic knowledge management processes. Discusses total quality management and quality control in the context of information management. (Author/LRW)

  13. 41 CFR 109-27.102-50 - Systems contracting.

    Science.gov (United States)

    2010-07-01

    ...-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102-50 Systems contracting. Systems contracting may... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Systems contracting. 109-27.102-50 Section 109-27.102-50 Public Contracts and Property Management Federal Property Management...

  14. Contract Design: The problem of information asymmetry

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries.  Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation.  Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection and after conclusion of a contract (moral hazard.  Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved

  15. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  16. Introduction of quality management (1973)

    International Nuclear Information System (INIS)

    1973-03-01

    This book deals with quality management, which indicates company activity, function and system, quality and price, basic, technology, production, policy and train of quality management, data experience and sense, data for analysis, about experiment plan, method for analysis, what is quality? standardization for process control, quality and check, education plan, practice of education, check of the result and reliability and quality management and assurance of reliability.

  17. Integrating total quality management principles with the requirements of DOE Order 5700.6C

    Energy Technology Data Exchange (ETDEWEB)

    Hedges, D. [Scientific Ecology Group, Inc. (United States)

    1993-03-01

    The Department of Energy has recently required its field offices, contractors, and subcontractors to implement DOE Order 5700.6C, ``Quality Assurance,`` for all work on waste management contracts. The order restructures the 18 criteria of NQA-1 and focuses on the role of management in achieving and assuring quality, performance of activities to achieve and assure quality, and management`s assessment of its performance for the purpose of identifying improvements to be made. The DOE order also introduces elements of the total quality management (TQM) philosophy, which were not present in DOE Order 5700.6B. The research community within DOE has recently issued a document entitled DOE Order 5700.6C Implementation Guide, which is more explicit about the integration of TQM principles with the implementation of DOE Order 5700.6C in research facilities. The Environmental Protection Agency is sponsoring a quality assurance standard (ANSI/ASQC E-4) to replace EPA`s QAMS 005/80. The new standard is consistent with DOE Order 5700.6C, and it also stresses the integration of TQM principles within the quality assurance process. This paper discusses the intent and philosophy of the 10 criteria of the new DOE order, the status of ANSI/ASQC E-4, and how to effectively integrate TQM principles into the quality assurance process as the conversion is made from NQA-1 to DOE Order 5700.6C. The purpose and value of DOE Order 5700.6C Implementation Guide for research will also be discussed.

  18. The Alternative Quality Contract: Impact on Service Use and Spending for Children With ADHD.

    Science.gov (United States)

    Joyce, Nina R; Huskamp, Haiden A; Hadland, Scott E; Donohue, Julie M; Greenfield, Shelly F; Stuart, Elizabeth A; Barry, Colleen L

    2017-12-01

    In 2009, Blue Cross-Blue Shield of Massachusetts (BCBSMA) implemented the alternative quality contract (AQC), which pays provider organizations a global payment for all services used by enrollees. BCBSMA claims for 2006-2011 were used to compare youths enrolled in provider organizations participating in the AQC (7,407 person-years [PYs]) with those not participating (45,398 PYs). Difference-in-differences models estimated changes in mental health and substance abuse treatment service utilization and spending attributable to the AQC. The AQC was associated with small increases in the probability of any outpatient visits and in the probability and number of medication management visits among children with attention-deficit hyperactivity disorder (ADHD). Spending did not change, and there was no evidence of reductions in service utilization or spending for children with ADHD in the first three years of AQC implementation.

  19. Quality Assurance Practices for the AN/FMQ-7 Optical Telescope Procurement

    National Research Council Canada - National Science Library

    1994-01-01

    ... contract quality assurance practices by the Defense Contract Management Mea Operations Dallas, Texas (DCMAO Dallas), on an Air Force contract for upgrading the Air Force's solar electro-optical network...

  20. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  1. Portuguese food composition database quality management system.

    Science.gov (United States)

    Oliveira, L M; Castanheira, I P; Dantas, M A; Porto, A A; Calhau, M A

    2010-11-01

    The harmonisation of food composition databases (FCDB) has been a recognised need among users, producers and stakeholders of food composition data (FCD). To reach harmonisation of FCDBs among the national compiler partners, the European Food Information Resource (EuroFIR) Network of Excellence set up a series of guidelines and quality requirements, together with recommendations to implement quality management systems (QMS) in FCDBs. The Portuguese National Institute of Health (INSA) is the national FCDB compiler in Portugal and is also a EuroFIR partner. INSA's QMS complies with ISO/IEC (International Organization for Standardisation/International Electrotechnical Commission) 17025 requirements. The purpose of this work is to report on the strategy used and progress made for extending INSA's QMS to the Portuguese FCDB in alignment with EuroFIR guidelines. A stepwise approach was used to extend INSA's QMS to the Portuguese FCDB. The approach included selection of reference standards and guides and the collection of relevant quality documents directly or indirectly related to the compilation process; selection of the adequate quality requirements; assessment of adequacy and level of requirement implementation in the current INSA's QMS; implementation of the selected requirements; and EuroFIR's preassessment 'pilot' auditing. The strategy used to design and implement the extension of INSA's QMS to the Portuguese FCDB is reported in this paper. The QMS elements have been established by consensus. ISO/IEC 17025 management requirements (except 4.5) and 5.2 technical requirements, as well as all EuroFIR requirements (including technical guidelines, FCD compilation flowchart and standard operating procedures), have been selected for implementation. The results indicate that the quality management requirements of ISO/IEC 17025 in place in INSA fit the needs for document control, audits, contract review, non-conformity work and corrective actions, and users' (customers

  2. Impact on quality culture of total quality management practices factors

    Directory of Open Access Journals (Sweden)

    Faihan Mosaad Saud Alotaibi

    2014-09-01

    Full Text Available This study investigated total quality management practices and quality culture of Saudi Arabian contractors. Improving the quality can be achieved through implementation of total quality management although studies and researches work regarding this improvement is still lacking. A quantitative approach using the survey method was employed. With assistance from the Saudi Arabia Ministry of Municipal and Rural Affairs, survey questionnaires were distributed to selected contractors in Saudi Arabia. The collected data were analysed using correlation, and multiple regression analyses. The key findings were the confirmation of significant relationships between all total quality management practices and quality culture and a positive relationship between quality management practices and quality culture. Furthermore, total quality management practices were found to be able to explain 68.1% of the variance in quality culture, while quality culture explained 12.5% of the variance in competitiveness. Quality culture was found to only partially mediate the relationship between total quality management practices and competitiveness.

  3. Contract Design: Financial Options and Risk.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  4. Quality assurance and supervision of mass concrete construction under EPC mode

    International Nuclear Information System (INIS)

    Peng Hong

    2013-01-01

    Taking one typical general contraction project-Hainan Changjiang nuclear power project as an example, this paper introduces the mass concrete construction of nuclear island foundation of Unit 1 in its installation phase, elaborates how to conduct quality assurance and supervision for concrete production, construction, supervision and management, detects relevant weak points of quality and management in the mass concrete construction through quality assurance supervision, puts forward management requirements for the supervising organizations, accumulates useful experience on how to promote contractors to implement the contract in line with national laws, regulations and to improve the management in equipment installation, commissioning and acceptance. (authors)

  5. Software quality management

    International Nuclear Information System (INIS)

    Bishop, D.C.; Pymm, P.

    1991-01-01

    As programmable electronic (software-based) systems are increasingly being proposed as design solutions for high integrity applications in nuclear power stations, the need to adopt suitable quality management arrangements is paramount. The authors describe Scottish Nuclear's strategy for software quality management and, using the main on-line monitoring system at Torness Power Station as an example, explain how this strategy is put into practice. Particular attention is given to the topics of software quality planning and change control. (author)

  6. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  7. The impact of leadership qualities on quality management improvement

    Directory of Open Access Journals (Sweden)

    Ph. D. Radoslaw Wolniak

    2011-05-01

    Full Text Available Currently, the importance of leadership is considered more and more often in quality management. The need of an appropriate leader has been already emphasized in ISO 9000 standards, in TQM philosophy as well as in different models of improvement which are used in the methodologies of prizing quality. Yet, it is in the concept of TQL where the attitude based on the need of leadership in an organization has achieved its best-developed, full shape. On the basis of the conducted studies, the following publication presents the analysis of the dependence between leadership qualities of managers and the improvement of quality management. There has been an attempt to define the qualities, which a manager being responsible for quality management, should have.

  8. The impact of leadership qualities on quality management improvement

    Directory of Open Access Journals (Sweden)

    Radoslaw Wolniak

    2011-12-01

    Full Text Available Currently, the importance of leadership is considered more and more often in quality management. The need of an appropriate leader has been already emphasized in ISO 9000 standards, in TQM philosophy as well as in different models of improvement which are used in the methodologies of prizing quality. Yet, it is in the concept of TQL where the attitude based on the need of leadership in an organization has achieved its best-developed, full shape. On the basis of the conducted studies, the following publication presents the analysis of the dependence between leadership qualities of managers and the improvement of quality management. There has been an attempt to define the qualities, which a manager being responsible for quality management, should have.

  9. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  10. Quality management in SNSA

    International Nuclear Information System (INIS)

    Levstek, M.F.; Slokan Dusic, D.

    2002-01-01

    The Slovenian Nuclear Safety Administration (SNSA) within the Ministry of Environment, Spatial Planning and Energy acts as the national regulatory authority for nuclear safety and radiation protection of workers in nuclear installations and of population in the vicinity of nuclear facilities. The SNSA has decided to document its own quality management system due to two basic reasons. Firstly, as a regulatory body for nuclear and radiological safety the SNSA should have an adequate quality management system. Secondly, the Slovenian Government stimulates the initiation of a quality system in all public authorities and that is evident from its strategic directives and aims. In order to develop the quality management system the Quality Board and the Project Team have been established. The quality management system is being developed in accordance with International Standard ISO 9001: 2000, IAEA Safety Series No. 50-C/SG-Q; January 2001 and the IAEATECDOC- 1090: Quality Assurance within Regulatory Bodies; June 1999 considering all other adequate documents referring to nuclear quality. The quality manual together with subordinate level documents are the means to conveying the elements and operation of the quality system to all staff involved, ensuring that the system is effectively implemented and achieves its goals.(author)

  11. An Examination of the Relational Aspects of Leadership Credibility, Psychological Contract Breach and Violation, and Interactional Justice

    OpenAIRE

    Johnson, Nicole Annette

    2009-01-01

    Especially during times of intense change, managers may negatively impact the quality of employee-manager relationships by breaching or violating psychological contract terms and exhibiting unfair treatment (i.e., interactional injustice) in the workplace. A psychological contract is conceptualized as an exmployee's perception or individualistic belief about the reciprocal and promissory nature of the employment relationship (Argyris, 1960; Levinson, Price, Munden, Mandl, & Solley, 1966; Rou...

  12. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  13. Quality management and Juran's legacy

    NARCIS (Netherlands)

    Bisgaard, S.

    2008-01-01

    Quality management provides the framework for the industrial application of statistical quality control, design of experiments, quality improvement, and reliability methods. It is therefore helpful for quality engineers and statisticians to be familiar with basic quality management principles. In

  14. Development on quality management concepts

    OpenAIRE

    Dragan Cristian; Stanca Costel

    2011-01-01

    The purpose of this paper is to perform an analysis of the history of the Total Quality Management (TQM) in the private sector, taking a closer look at its five stages in the Western hemisphere: quality inspection, statistical quality control, system-oriented quality assurance, company-wide quality control, total quality management

  15. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  16. Health, safety, and environmental management system operation in contracting companies: A case study.

    Science.gov (United States)

    Nassiri, Parvin; Yarahmadi, Rasoul; Gholami, Pari Shafaei; Hamidi, Abdolamir; Mirkazemi, Roksana

    2016-05-03

    Systematic and cooperative interactions among parent industry and contractors are necessary for a successful health, safety, and environmental management system (HSE-MS). This study was conducted to evaluate the HSE-MS performance in contracting companies in one of the petrochemical industries in Iran during 2013. Managers of parent and contracting companies participated in this study. The data collection forms included 7 elements of an integrated HSE-MS (leadership and commitment; policy and strategic objectives; organization, resources, and documentation; evaluation and risk management; planning; implementation and monitoring; auditing and reviewing). The results showed that mean percentage of the total scores in seven elements of HSE-MS was 85.7% and 87.0% based on self-report and report of parent company, respectively. In conclusion, this study showed that HSE-MS was desirably functioning; however, improvement to ensure health and safety of workers is still required.

  17. The contracting risks of nuclear power engineering and the risk management strategies

    International Nuclear Information System (INIS)

    Ding Shuying

    2010-01-01

    With the trend of professional operation on the nuclear power engineering (thereafter using NPE for short) construction, the companies specialized on NPE whole-contracting are established one after the other, the mode of NPE whole-contracting has been wide adopted domestically. As people always concern for the safety of nuclear power, the risks exposed to NPE contractors are also concerned with the operator, the NPE corporations and the society. Therefore, it is very meaningful to analyze on the risks exposed to NPE contractors and the strategies they should take, for it not only determines whether the NPE construction will be finished on time, but also related to sustainable development of the NPE contracting corporations. The main content of this paper includes the analysis on the features and advantages of NPE whole contracting, the major NPE contracting risks, such as nuclear safety risks, strategic risks, market risks, legal risks, financial risks and operation risks, and the strategies to prevent or to control these risks. The paper focuses on identifying those business processes which risks may frequently take place, and how to manage them, illustrating practice cases to explain the theory, in order to make reference to NPE corporations. (author)

  18. Quality function and the quality manager

    Directory of Open Access Journals (Sweden)

    Dr.Sc. Miraç Hani

    2012-12-01

    Full Text Available In many organizations, management systems are viewed in terms of the internal dynamics between marketing, design, production, distribution, and accounting. A change is required from this to a larger system which also encompasses and integrates the business interests of customers and   suppliers. Management needs to develop an in-depth understanding of these relationships and how they may be used to cement the partnership concept. The quality function should be the organization’s focal point in this respect and should be equipped to gauge internal and external customers, expectations and degree of satisfaction. It should also identify quality deficiencies in all business functions and promote improvements. The role of the quality function is to make quality become an inseparable aspect of every employee’s performance and responsibility. The transition in many companies from quality departments with line functions will require careful planning, direction and monitoring. Quality professionals have developed numerous techniques and skills focused on product or service quality.

  19. 48 CFR 970.2210 - Service Contract Act.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  20. Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

    International Nuclear Information System (INIS)

    2009-01-01

    The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract

  1. Some Operational Aspects Relating to Quality Management and Total Quality Management

    OpenAIRE

    Sorin GRESOI; Aurelian DIACONU

    2013-01-01

    The work pass in review a few basic concepts found in quality management focusing on operational aspects of quality assurance in production activity and continue with issues regarding total quality strategy, the vector of competitiveness on the market.

  2. Total quality management in American industry.

    Science.gov (United States)

    Widtfeldt, A K; Widtfeldt, J R

    1992-07-01

    The definition of total quality management is conformance to customer requirements and specifications, fitness for use, buyer satisfaction, and value at an affordable price. The three individuals who have developed the total quality management concepts in the United States are W.E. Deming, J.M. Juran, and Philip Crosby. The universal principles of total quality management are (a) a customer focus, (b) management commitment, (c) training, (d) process capability and control, and (e) measurement through quality improvement tools. Results from the National Demonstration Project on Quality Improvement in Health Care showed the principles of total quality management could be applied to healthcare.

  3. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  4. Quality Assurance Program Plan Waste Management Federal Services of Hanford, Inc

    International Nuclear Information System (INIS)

    VOLKMAN, D.D.

    1999-01-01

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program

  5. Optimal contract for a fund manager, with capital injections and endogenous trading constraints

    OpenAIRE

    Nadtochiy, Sergey; Zariphopoulou, Thaleia

    2018-01-01

    In this paper, we construct a solution to the optimal contract problem for delegated portfolio management of the fist-best (risk-sharing) type. The novelty of our result is (i) in the robustness of the optimal contract with respect to perturbations of the wealth process (interpreted as capital injections), and (ii) in the more general form of principals objective function, which is allowed to depend directly on the agents strategy, as opposed to being a function of the generated wealth only. ...

  6. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  7. Dependence on Supplier, Supplier Trust and Green Supplier Integration: The Moderating Role of Contract Management Difficulty

    Directory of Open Access Journals (Sweden)

    Xuesong Zhao

    2018-05-01

    Full Text Available This study aims to investigate the impacts of dependence on supplier and supplier trust on green supplier integration, and the moderating role of contract management difficulty. In this study, we develop a dependence-trust-integration model based on resource dependence theory, social capital theory and transaction cost theory. We examine the hypothesized relationships using hierarchical regression analyses based on data collected from 187 Chinese firms. Our findings suggest that dependence on supplier has positive impacts on green supplier integration and supplier trust. Supplier trust partially mediates the relationship between dependence on supplier and green supplier integration. In addition, contract management difficulty negatively moderates the relationship between supplier trust and green supplier integration. This research contributes to the literature by offering empirical evidence concerning the indirect relationship between dependence on supplier and green supplier integration via supplier trust, and the trust-integration link depends on the level of contract management difficulty.

  8. Quality Management in Higher Education

    OpenAIRE

    Svoboda, Petr

    2017-01-01

    The thesis deals with quality management theory as an important part of management science. The primary objective of this work is an identification, formulation and analysis of such managerial issues in quality of higher education, which either are not known, or whose resolution is not considered fully sufficient. The thesis contains a bibliography of more than 200 related scientific works and presents selected issues of quality management in higher education, such as quality perception or it...

  9. Quality management

    International Nuclear Information System (INIS)

    1989-01-01

    The 1989 Quality Management Conference focusses on process control and the thus achievable product quality. It is shown that the buyers' increasing demands on product quality require appropriate response in terms of enhanced efforts and methods for quality assurance in the production process. The connection between quality targets and the expenditure required is shown, as well as a comparative validation of efficiency of quality assurance methods. The firms selected for representation at this conference cover a wide range of products so that practically the entire scope of process control problems in the various industrial branches is discussed in the conference contributions. The last conference session is concerned with the strategies and technical developments for enhanced combination of quality assurance and control and production processes. (orig./HP) [de

  10. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  11. Fundamentals of Value Based Management in practice of Quality management

    Directory of Open Access Journals (Sweden)

    Katarzyna Szczepańska

    2010-03-01

    Full Text Available The article discusses the practical aspects of using the theory of value management in quality management. Presents the essence of value based management (VBM as a background of reflection on its links with quality management. Coherence of the concept in practice, been reviewed in the author’s own studies. The discovery of absence of sufficient procedural structure of the metrics of an economic – financial, to measure the value of the quality management system, points to a gap between the theoretical and practical considerations in managing the value of the company quality management system.  

  12. Contracting and Performance in Agencies

    DEFF Research Database (Denmark)

    Bjørnholt, Bente; Houlberg Salomonsen, Heidi; Rennison, Betina Wolfgang

    As part of New Public Management (NPM), contracting represents a supplement to the traditional hierarchical and rule-based managing of relations between actors in order to improve performance (Fortin and van Hassel 2000; Greve and Ejersbo 2002; Drewry et al. 2005; Verhoest 2005). To various degrees...... higher goal attainment when agency head experience that the department balance dialogue and autonomy with some element of control in the process of internal contracting (Bjørnholt and Salomonsen 2011). This implies, that effective steering include a combination of decentralized management...... and how a balanced use of internal contracting leads to a better performance. These findings are then theoretically interpreted based upon a combination of literature on agencification as well as public management. We compare contracting across all Danish agencies based on a combination of survey...

  13. Report on Allegation of Unsatisfactory Conditions Regarding Actions by the Defense Contract Management Agency, Earned Value Management Center

    Science.gov (United States)

    2010-07-28

    object ivity of Defen se Contract Management Agency to carry ou t its ea rn ed va lue managemen t oversight responsibilities; and DCMA Response: Non...Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302...Earned Value Management Center Director advised us that the 2-week time frame was “standard operating procedure” for performing compliance reviews at

  14. Evaluating opportunities for direct contracting between employers and physician-hospital organizations.

    Science.gov (United States)

    Straley, P F; Swaim, C R

    1994-01-01

    Employers seeking to reduce health care expenditures are turning to direct contracting as a way to control provider cost increases. In a direct contract, the participation of third parties is minimized. The health care provider and a corporate buyer directly negotiate a price agreement for the delivery of health care services. However, as managed care penetration increases, the ability of hospitals and physicians to assume risk while providing high quality, cost effective care will be paramount. Physicians and hospitals who choose to work together may find a physician-hospital organization an effective vehicle to meet the current and future market challenges of direct contracting.

  15. Implementation guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1998-01-01

    This report is an Implementation Guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511 to provide a set of uniform instructions for managing the two contractors selected. The primary objective is to produce the necessary deliverables and services for the HTI project within schedule and budget

  16. Quality Management and Information Brokerage.

    Science.gov (United States)

    van Halm, Johan

    1995-01-01

    To compete effectively, information brokers need to adopt management and marketing tools; Total Quality Management can upgrade an organization's performance by using customer feedback of its services. SERVQUAL identifies gaps in service by assessing quality expectations versus quality experiences. (AEF)

  17. A Contract That Manages Itself: The Time Has Arrived

    Science.gov (United States)

    2015-02-01

    technology inspires contracting. The Smart Contract The paradigm of a contract as a static document is about to change. The days of a contract being read...efficiency is of paramount importance in order for an organization to perform its mission. The Smart Contract as an Object In discussions about...the contract object ( smart contract ) exists, the contract will be able to interact with other objects. That will enable the contract to know how

  18. Quality Management, Quality Assurance and Quality Control in Blood Establishments

    OpenAIRE

    Bolbate, N

    2008-01-01

    Quality terms and the roots of the matter are analyzed according to European Committee’s recommendations. Essence of process and product quality control as well as essence of quality assurance is described. Quality system’s structure including quality control, quality assurance and management is justified in the article.

  19. A decision-making framework to integrate maintenance contract conditions with critical spares management

    International Nuclear Information System (INIS)

    Godoy, David R.; Pascual, Rodrigo; Knights, Peter

    2014-01-01

    Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits

  20. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  1. Managing the risks associated with natural gas purchase contracts

    International Nuclear Information System (INIS)

    Brett, T.

    2003-01-01

    This presentation described different styles of gas contracts. When markets opened in 1986, many contracts were between end users and producers, and a few marketers. Typically, contracts were for a fixed price and term. In 1990, when gas futures contracts began trading on NYMEX, contracts began to have floating prices, and prices linked to NYMEX prices. Standard gas contracts were developed in the mid-late 1990s. This paper described the differences between plain retail gas contracts, retail gas contracts between mass marketers and end users, wholesale contracts, contracts between producers and marketers, transportation contracts and domestic contracts. Both contracting parties obtain business and legal advice from consultants and lawyers with knowledge in energy transactions. Master agreement contracts were also described with reference to the Gas EDI contract. Examples of changing regulatory requirements were also outlined along with some traps to avoid. Bundled transportation agreements are standard documents that can be negotiated in special circumstances to charge customers who fail to deliver. They should be considered as tariffs

  2. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  3. Developing Quality Managers and Quality Management: The Challenge to Leadership in Library Organizations.

    Science.gov (United States)

    Orenstein, David

    1999-01-01

    Considers the use of Total Quality Management (TQM) tools by library managers to develop quality relationships between staff and customers. Topics include building a shared vision, putting the needs of customers before organizational politics, cooperation between levels of employees, communication, teamwork, trust, redesigning processes and…

  4. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  5. Supply chain quality management

    Directory of Open Access Journals (Sweden)

    Hannan Amoozad Mahdiraji

    2012-10-01

    Full Text Available In recent years, there are several methods introduced for the improvement of operational performances. Total quality management and supply chain management are two methods recommended for this purpose. These two approaches have been studied in most researches separately, while they have objectives in common, and this makes them a strategic means, which can be used, simultaneously. Total quality management and supply chain management play significant roles to increase the organizational competitiveness power. Moreover, they have only one purpose that is customer satisfaction, and they are different only on their approaches to reach their objectives. In this research, we aim to study both approaches of quality management and supply chain, their positive increasing effects that may be generated after their integration. For this purpose, the concept and definitions of each approach is studied, independently, their similarities and differences are recognized, and finally, the advantages of their integration are introduced.

  6. Performance Contracting as a Performance Management Tool in the Public Sector in Kenya: Lessons of learning

    Science.gov (United States)

    Hope, Kempe Ronald, Sr.

    2013-01-01

    The purpose of this article is to provide an assessment and analysis of public sector performance contracting as a performance management tool in Kenya. It aims to demonstrate that performance contracting remains a viable and important tool for improving public sector performance as a key element of the on-going public sector transformation…

  7. Quality management of nuclear power plants

    International Nuclear Information System (INIS)

    Maxwell, D.A.; Hille, F.J.M.

    1995-01-01

    The paper discusses the various approaches to quality management and the progressive development from traditional quality assurance (QA) concepts through integrated and performance based quality management systems to total quality management. Experience has shown that in many cases the traditional implementation of QA in nuclear power plant life-cycle activities has resulted in limited benefits. The paper outlines the advantages of developing an integrated quality management system, which, besides satisfying the QA standards, focuses on the performance of an organization. This reflects the approach implicit in the proposed revisions of the IAEA QA standards (code and guides). Such a quality management system provides the framework within which processes are controlled to meet the business objectives and is capable of accommodating easily new requirements, such as environmental management. An integrated quality management system should not be focused specifically on regulatory (and hence nuclear safety) issues, but should constitute the whole management system of the organization, of which safety and the environment are of course important elements. The paper gives a practical example of this approach implemented company wide. This approach is similar to other approaches in place or being developed by many Foratom members. The paper also lists the components of total quality management, which is considered to constitute the future direction for the nuclear power industry. The quality management system is the primary vehicle to meet the fundamental objectives, but total quality can only be realized by developing the full potential of people through team work in order to continuously improve the system and the performance of the organization by focusing on internal as well as external customers. (author). 6 refs, 3 figs, 2 tab

  8. Solutions to Improve Educational Management Quality

    OpenAIRE

    Ramezan Jahanian; Masoomeh Motahari

    2013-01-01

    Nowadays, enhancing the quality in educational systems of different countries has gained especial importance and stand. Improving utilizing and increasing the quality in our country’s educational system is felt too. One of the utilizing factors in education system is to improve the educational management quality.In this article, effective factors in educational management quality and one of its improving solutions, thorough management quality, is analyzed.

  9. [Quality management in intensive care medicine].

    Science.gov (United States)

    Martin, J; Braun, J-P

    2013-09-01

    Treatment of critical ill patients in the intensive care unit is tantamount to well-designed risk or quality management. Several tools of quality management and quality assurance have been developed in intensive care medicine. In addition to extern quality assurance by benchmarking with regard to the intensive care medicine, peer review procedures have been established for external quality assurance in recent years. In the process of peer review of an intensive care unit (ICU), external physicians and nurses visit the ICU, evaluate on-site proceedings, and discuss with the managing team of the ICU possibilities for optimization. Furthermore, internal quality management in the ICU is possible based on the 10 quality indicators of the German Interdisciplinary Society for Intensive Care Medicine (DIVI, "Deutschen Interdisziplinären Vereinigung für Intensiv- und Notfallmedizin"). Thereby every ICU has numerous possibilities to improve their quality management system.

  10. An SME's quality management experience

    International Nuclear Information System (INIS)

    Gorham, B.; Scott, C.K.

    2006-01-01

    Small and medium sized enterprises (SME's) that supply services to nuclear power plants have to meet the station's quality requirements. To improve its quality program, Atlantic Nuclear (an SME) adopted the ISO 9001 standard for its management system. Vendor registrations are then achieved by adding specific elements as required by the clients. This paper discusses the experience, both positive and negative, from implementing and continually improving the quality management program for Atlantic Nuclear, a small nuclear engineering service provider. We also discuss how quality management principles are implemented and embraced by the company. (author)

  11. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  12. [Quality management is associated with high quality services in health care].

    Science.gov (United States)

    Nielsen, Tenna Hassert; Riis, Allan; Mainz, Jan; Jensen, Anne-Louise Degn

    2013-12-09

    In these years, quality management has been the focus in order to meet high quality services for the patients in Danish health care. This article provides information on quality management and quality improvement and it evaluates its effectiveness in achieving better organizational structures, processes and results in Danish health-care organizations. Our findings generally support that quality management is associated with high quality services in health care.

  13. Quality assurance management policies and requirements

    International Nuclear Information System (INIS)

    1985-10-01

    The purpose of this document is to: set forth overall, integrated quality assurance management policies and requirements for the entire Civilian Radioactive Waste Management Program; define management responsibilities for assuring quality; and provide a general framework for the development of more detailed quality assurance management policies and requirements by program, project, and contractor organizations

  14. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  15. Quality management in shipping companies

    Directory of Open Access Journals (Sweden)

    Đergović Dragana M.

    2017-01-01

    Full Text Available As international business becomes more competitive, companies are finding that they need to work more effectively to stay in business. Quality assurance has become very important to the majority of production and service companies with international activity. Shipping companies were also required to implement a quality management system. The huge importance of safety in maritime transport operations resulted in the International Safety Management Code (ISM Code by the International Maritime Organization. The general management system principles embodied by the maritime ISM Code and generics ISO standards, have enabled their complementary application in establishing a quality management system in shipping companies, within a safety management system as its subset.

  16. Supplier behaviour and public contracting in the English agency nursing market.

    Science.gov (United States)

    Lonsdale, Chris; Kirkpatrick, Ian; Hoque, Kim; de Ruyter, Alex

    2010-01-01

    The worldwide expansion in the use of private firms to deliver public services and infrastructure has promoted a substantial literature on public sector contract and relationship management. This literature is currently dominated by the notion that supplier relationships should be based upon trust. Less prominent are more sceptical approaches that emphasize the need to assiduously manage potential supplier exploitation and opportunism. This article addresses this imbalance by focusing upon the recent experience of the English National Health Service (NHS) in its dealings with its nursing agencies. Between 1997 and 2001, the NHS was subjected to considerable exploitation and opportunism. This forced managers to adopt a supply strategy based upon an assiduous use of e-auctions, framework agreements and quality audits. The article assesses the effectiveness of this strategy and reflects upon whether a more defensive approach to contract and relationship management offers a viable alternative to one based upon trust.

  17. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  18. 48 CFR 242.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ...) Contractor estimating systems (see FAR 15.407-5); and (B) Contractor material management and accounting... report identifying significant accounting system or related internal control deficiencies. (9) For... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract...

  19. Quality assurance as a management duty

    International Nuclear Information System (INIS)

    Hudritsch, J.

    1992-01-01

    This paper deals with the framework conditions for quality, methods and techniques, process thought, self-examination and controlling. The term 'Total Quality Management' is explained. It is shown that quality management must be an integral component of daily management practice by senior staff. figs., tabs

  20. 15 CFR 995.25 - Quality management system.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Quality management system. 995.25... § 995.25 Quality management system. (a) Quality management system for CEVADs. (1) CEVAD shall operate a quality management system, based on ISO 9001-2000 or equivalent, which embraces all elements of the...

  1. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  2. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  3. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  4. Managing the relational character of public-private partnership contracts

    OpenAIRE

    Cvetković, Predrag

    2015-01-01

    A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration). Cons...

  5. Managed care and the quality of substance abuse treatment.

    Science.gov (United States)

    Shepard, Donald S; Daley, Marilyn; Ritter, Grant A; Hodgkin, Dominic; Beinecke, Richard H

    2002-12-01

    In the US, the spiraling costs of substance abuse and mental health treatment caused many state Medicaid agencies to adopt managed behavioral health care (MBHC) plans during the 1990s. Although research suggests that these plans have successfully reduced public sector spending, their impact on the quality of substance abuse treatment has not been established. The Massachusetts Medicaid program started a risk-sharing contract with MHMA, a private, for-profit specialty managed behavioral health care (MBHC) carve-out vendor on July 1, 1992. This paper evaluates the carve-out s impact on spending per inpatient episode and three proxy measures of quality: (i) access to inpatient treatment (ii) 30-day re-admissions and (iii) continuity of care. Medicaid claims for inpatient treatment were collapsed into episodes. Clients were tracked across the five-year period and an interrupted time series design was used to compare the three quality outcomes and spending in the year prior to (FY1992) and the four years during MHMA (FY1993-FY1996). Logistic and linear regression models were used to control for race, disability status, age, gender and primary diagnosis. Despite a 99% reduction in the use of hospital-based settings, access to 24-hour services overall increased by 38%, largely due to an expansion in the use of freestanding detoxification and acute residential services. Continuity improved by 73%. Nevertheless, rates of 7-day (58%) and 30-day (24%) readmission increased significantly, even after controlling for increases in disability status. Per episode spending decreased by 76% ($2,773), characterized by a dramatic spending reduction in FY1993 that was maintained but not augmented in subsequent years. The carve-out had mixed effects on the quality of substance abuse treatment. While one of the three measures (readmission rates) deteriorated, two improved (access and continuity). Rapid re-admissions were strongly associated with shorter lengths of stay, suggesting that

  6. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  7. The quality of tourism destination – integrated quality management

    Directory of Open Access Journals (Sweden)

    Ida Vajčnerová

    2009-01-01

    Full Text Available The paper deals with the quality of tourism services. It mentions various ways of approaching quality management, such as the standards of quality, systems based on ISO standards and systems of complex quality management. It describes approaches applied in the Czech Republic and points out the difficulty keeping the quality in tourism. Tourism services are not offered individually, which is why it is necessary to assess the quality of a whole complex of services within the frame of a tourism product or a tourist destination. The level of tourists' satisfaction is not based on the quality of individual tou­rism services or a destination product but it arises from their overall impression which is formed from the hospitality of local inhabitants, the willingness of employees, the cleanness of the environment, security and so on. The presumption of maintaining the quality of a destination is a unified approach of all participants in tourism development that can be reached by various forms of cooperation. Crea­ting a strategic alliance is one of such possibilities. The main objective of the article is to introduce the European system of Integrated Quality Management (IQM and the tool for assessing the qua­li­ty in a destination “Qualitest”. The Integrated Quality Management is an approach based on the cooperation of all areas taking part in tourism development in a destination. The qua­li­ty is assessed in a complex way with respect to tourism development impacts on local inhabitants and the environment. “Qualitest” is made of 16 indexes that are focused on the quality of a destination and the quality of a product. Each index is evaluated by three indicators that asses the quality of conditions (QPCI, the quality of management (QMI and the quality of a destination performance (QPI. These indicators combine qualitative as well as quantitative values. The precondition for using “Qualitest” in our destinations is the existence of a

  8. 48 CFR 251.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Fleet Management System (IFMS) Vehicles 251.205 Contract clause. Use the clause at 252.251-7001, Use of Interagency Fleet Management System (IFMS)Vehicles and Related Services, in solicitations and contracts which include the clause at FAR 52.251-2, Interagency Fleet Management System (IFMS) Vehicles and Related...

  9. Statistical quality management using miniTAB 14

    International Nuclear Information System (INIS)

    An, Seong Jin

    2007-01-01

    This book explains statistical quality management giving descriptions of definition of quality, quality management, quality cost, basic methods of quality management, principles of control chart, control chart for variables, control chart for attributes, capability analysis, other issues of statistical process control, acceptance sampling, sampling for variable acceptance, design and analysis of experiment, Taguchi quality engineering, reaction surface methodology reliability analysis.

  10. Use of performance standards in behavioral health carve-out contracts among Fortune 500 firms.

    Science.gov (United States)

    Merrick, E L; Garnick, D W; Horgan, C M; Goldin, D; Hodgkin, D; Sciegaj, M

    1999-06-25

    To determine the prevalence and nature of performance standards in specialty managed behavioral healthcare contracts among Fortune 500 companies. This was a cross-sectional survey of all companies listed on the Fortune 500 during 1994, 1995, or both. From April 1997 to May 1998 we conducted a mailed survey with phone follow-up. Of the 68% of firms that responded, over one third reported carve-out contracts. The survey focused on whether companies had behavioral health carve-out contracts with specialty vendors and characteristics of these contracts, including the use of performance standards. More than three quarters of the Fortune 500 companies reporting specialty behavioral healthcare contracts used at least one performance standard. Most common were administrative standards (70.2%) and customer service standards (69.4%). About half of the companies used quality standards, whereas only a third used provider-related standards. Most (58.8%) companies using performance standards also specified financial consequences. Larger Fortune 500 firms were significantly more likely to use performance standards. Risk contracts and contracts that included all covered employees were also more likely to include some categories of standards. Administrative and customer service standards may be most common because companies find it easier to specify those standards, especially compared with clinical quality measures. To the extent that employers want to obtain the most value from their behavioral healthcare purchasing, we expect that more will begin to adopt quality standards in their contracts, especially as performance measures become more refined. Reliance on accreditation, however, is an alternative approach for employers.

  11. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J. van den; Smulders, P.G.W.; Taris, T.W.

    2012-01-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract,

  12. Repository construction management and quality assurance

    International Nuclear Information System (INIS)

    Hood, F.C.

    1984-01-01

    An emphasis on preventive rather than reactive management is key to an efficient construction management operation. Development of contingency plans to deal with unexpected adverse conditions, e.g., brine pockets during mining operations, are an integral part of the management program to ensure project safety, quality, cost, schedule and environmental objectives are met. A viable quality assurance program with active management support will optimize management effectiveness in reaching project goals. With adequate planning and perceptive application of the proper management controls, Quality Assurance becomes an essential ingredient for efficiently managing a job because it has been built into the management system rather than being an uninvolved peripheral entity. 6 references, 3 figures

  13. Air Quality Management Process Cycle

    Science.gov (United States)

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  14. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  15. Quality management

    OpenAIRE

    Forrest, Diana

    1997-01-01

    scen Scenario Interactive Media Element This mini-case study walks users through a scenario and user must make business decisions for a company that looks at the issues of quality and cost. GB3042 Operations Management

  16. Heavy Water Quality Management in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Ho Chul; Lee, Mun; Kim, Hi Gon; Park, Chan Young; Choi, Ho Young; Hur, Soon Ock; Ahn, Guk Hoon

    2008-12-15

    Heavy water quality management in the reflector tank is a very important element to maintain the good thermal neutron flux and to ensure the performance of reflector cooling system. This report is written to provide a guidance for the future by describing the history of the heavy water quality management during HANARO operation. The heavy water quality in the reflector tank has been managed by measuring the electrical conductivity at the inlet and outlet of the ion exchanger and by measuring pH of the heavy water. In this report, the heavy water quality management activities performed in HANARO from 1996 to 2007 ere described including a basic theory of the heavy water quality management, exchanging history of used resin in the reflector cooling system, measurement data of the pH and the electrical conductivity, and operation history of the reflector cooling system.

  17. Quality management: does it pay off?

    Science.gov (United States)

    van den Heuvel, Jaap; Bogers, Ad J J C; Does, Ronald J M M; van Dijk, Sandra L; Berg, Marc

    2006-01-01

    Health care today is facing serious quality problems while costs are exploding. Quality management therefore becomes a major strategic challenge. In this article, we go through the strategy deployment and quality management process of the Red Cross Hospital in the Netherlands. Growth, efficiency improvement, and optimizing quality of care were chosen as our main strategic goals. To enable achievement of these goals, we implemented and integrated an ISO 9001:2000 quality management system with Six Sigma, a quality improvement approach from industry. The results of 5 years of quality management illustrated by the scores of a number of performance indicators clearly show that we were able to achieve all our strategic goals. On the basis of our findings, we believe that the combination of ISO 9000 and Six Sigma provides the proper tools to bring health care organizations to a higher level of performance.

  18. Total quality management in orthodontic practice.

    Science.gov (United States)

    Atta, A E

    1999-12-01

    Quality is the buzz word for the new Millennium. Patients demand it, and we must serve it. Yet one must identify it. Quality is not imaging or public relations; it is a business process. This short article presents quality as a balance of three critical notions: core clinical competence, perceived values that our patients seek and want, and the cost of quality. Customer satisfaction is a variable that must be identified for each practice. In my practice, patients perceive quality as communication and time, be it treatment or waiting time. Time is a value and cost that must be managed effectively. Total quality management is a business function; it involves diagnosis, design, implementation, and measurement of the process, the people, and the service. Kazien is a function that reduces value services, eliminates waste, and manages time and cost in the process. Total quality management is a total commitment for continuous improvement.

  19. Corporate data quality management in context

    OpenAIRE

    Lucas, Ana

    2010-01-01

    Presently, we are well aware that poor quality data is costing large amounts of money to corporations all over the world. Nevertheless, little research has been done about the way Organizations are dealing with data quality management and the strategies they are using. This work aims to find some answers to the following questions: which business drivers motivate the organizations to engage in a data quality management initiative?, how do they implement data quality management? an...

  20. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  1. Contract Management Monitoring And Evaluation Of Ghana School Feeding Programme At Atwima Kwanwoma District

    Directory of Open Access Journals (Sweden)

    Andrews Osei Mensah

    2015-08-01

    Full Text Available Ghana School Feeding Programme was introduced at Atwima Kwanwoma District and other parts of the country in 2008 to alleviate hunger and to provide good nutrition for pupils in the public basic schools. Caterers were given contract to provide food to the school pupils on every school-going day under Ghana school feeding programme. Some years have lapsed and there is the need to look back and evaluate this programme taking into consideration the award and management of those contracts. The study also examined how the programme is monitored and evaluated. Data was collected from 80 respondents comprising 29 school pupils and 51 other actors through the use of questionnaire and interview guide It was realised that caterers who are well experience in catering services were awarded contracts based on their past experience and financial abilities through submission of their certificates but not necessarily through bidding. The main component of managing the caterers contract included monitoring payment of debt and problems solving as well as supervision through visiting the schools on quarterly basis. The programme has helped to increase enrolment and retaining pupils in school. It was found out that food giving to the pupils was not served on time not regularly bases and was not sufficient to the pupils as well. The health component of the programme has not been successful as expected. It is recommended that fruits and variety of foods need to be introduced together with de-worming the pupils.

  2. 48 CFR 542.1107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract... clause may be used in indefinite-delivery definite-quantity contracts for Stock or Special Order Program...

  3. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  4. Dynamic contracting mechanism for pavement maintenance management

    NARCIS (Netherlands)

    Demirel, H.C.; De Ridder, H.A.J.

    2013-01-01

    Technological advances, financial possibilities and changes of demands have increasingly affected the pavement maintenance environment for outsourcing in recent years. This induces complexity in the contracting methods of pavement maintenance activities. Despite the fact that current contracting

  5. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  6. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  7. The evolving local social contract for managing climate and disaster risk in Vietnam.

    Science.gov (United States)

    Christoplos, Ian; Ngoan, Le Duc; Sen, Le Thi Hoa; Huong, Nguyen Thi Thanh; Lindegaard, Lily Salloum

    2017-07-01

    How do disasters shape local government legitimacy in relation to managing climate- and disaster-related risks? This paper looks at how local authorities in Central Vietnam perceive their social contract for risk reduction, including the partial merging of responsibilities for disaster risk management with new plans for and investments in climate change adaptation and broader socioeconomic development. The findings indicate that extreme floods and storms constitute critical junctures that stimulate genuine institutional change. Local officials are proud of their strengthened role in disaster response and they are eager to boost investment in infrastructure. They have struggled to reinforce their legitimacy among their constituents, but given the shifting roles of the state, private sector, and civil society, and the undiminished emphasis on high-risk development models, their responsibilities for responding to emerging climate change scenarios are increasingly nebulous. The past basis for legitimacy is no longer valid, but tomorrow's social contract is not yet defined. © 2017 The Author(s). Disasters © Overseas Development Institute, 2017.

  8. Options for change in the NHS consultant contract.

    Science.gov (United States)

    Clarke, R W; Gray, C

    The lead negotiators for the management and consultant sides in an NHS trust in northern England responded to debate in their trust about consultant contracts by offering to research the attitudes of their peers towards a variety of contract options. The options tested included the current contract; models already examined in the trust and elsewhere, such as time sensitive and mild performance related contracts; and some more radical and speculative possibilities, including consultants franchising their services to the trust. Beyond the predictable conclusion that consultants would prefer no change while managers desired it, a time sensitive contract emerged as having potential for successful negotiation. On the other hand, neither consultants nor managers favoured a strict performance related contract or a fee for service contract. There was a strong similarity of opinion between the two groups on the relative salary values of the options, though the consultants consistently priced these higher than the managers.

  9. Quality Management of Engineering Education

    DEFF Research Database (Denmark)

    Bentz, Sigurd

    1997-01-01

    Quality management has made a major impact on many commercial and manufacturing companies. Although higher education are similar to companies in some respects, they are different in others. So a well established commercial quality management system can't simply be transferred to higher education...

  10. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  11. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  12. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  13. Quality Management of Services

    Directory of Open Access Journals (Sweden)

    Yuriy I. Dreizis

    2016-10-01

    Full Text Available It is shown that services take the leading place in modern, post-industrial society. The world economy has passed the period of deindustrialization and became service economy. Fundamentals of service economy are not physical goods, but service. The special nature of service and its property demands the mechanism of management, other than physical goods. Ensuring necessary quality of the provided service is one of the main problems, which is put before the organization by peculiar properties of service. Therefore, quality management of service is the most important branch of management of the modern organization.

  14. Leader--member exchange, differentiation, and psychological contract fulfillment: a multilevel examination.

    Science.gov (United States)

    Henderson, David J; Wayne, Sandy J; Shore, Lynn M; Bommer, William H; Tetrick, Lois E

    2008-11-01

    Prior integrations of the leader-member exchange (LMX) and psychological contract literatures have not clarified how within-group LMX differentiation influences employees' attitudes and behaviors in the employment relationship. Therefore, using a sample of 278 members and managers of 31 intact work groups at 4 manufacturing plants, the authors examined how LMX operating at the within-group level (relative LMX, or RLMX) and the group level influenced perceptions of psychological contract fulfillment and employee-level outcomes. Controlling for individual-level perceptions of LMX quality, results indicated a positive relationship between RLMX and fulfillment, which was strengthened as group-level variability in LMX quality increased. Perceptions of fulfillment mediated the relationship between RLMX and performance and sportsmanship behaviors. The importance of conceptualizing LMX as simultaneously operating at multiple levels is highlighted.

  15. HARD QUALITY MANAGEMENT AND PERFORMANCE: THE MODERATING ROLE OF SOFT QUALITY MANAGEMEN

    Directory of Open Access Journals (Sweden)

    Muhammad Madi Bin Abdullah

    2017-09-01

    Full Text Available The main aim of this study is to examine the moderating role of soft quality management practices (management commitment, customer focus, employee involvement, training and education, reward and recognition and supplier relationship between hard quality management and performance. The study uses data from 255 Electrical & Electronic organizations in Malaysia. A stepwise regression method was used. The results provided empirical support for the moderating role of soft quality management practices on the relationship between hard quality management and performance in a Malaysian context.

  16. Probability concepts in quality risk management.

    Science.gov (United States)

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  17. Quality management in a radiological practice

    Energy Technology Data Exchange (ETDEWEB)

    Kirsch, Michael, E-mail: kirschm@uni-greifswald.d [Department of Radiology, Universitaetsklinikum Greifswald der Ernst-Moritz-Arndt-Universitaet Greifswald AOR, Ferdinand-Sauerbruch-Strasse, 17487 Greifswald (Germany); Vogg, Ingrid, E-mail: ivmobil2@medimpuls.d [Stapelfelder Strasse 84, 22143 Hamburg (Germany); Hosten, Norbert, E-mail: hosten@uni-greifswald.d [Department of Radiology, Universitaetsklinikum Greifswald der Ernst-Moritz-Arndt-Universitaet Greifswald AOR, Ferdinand-Sauerbruch-Strasse, 17487 Greifswald (Germany); Flessa, Steffen, E-mail: Steffen.Flessa@uni-greifswald.d [General Business Studies and Health Management, Friedrich-Loeffler-Strasse 70, 17487 Greifswald (Germany)

    2010-07-15

    This paper describes the introduction of a total quality management system in a radiological practice. Certification was based on DIN EN ISO 9001:2000. The implementation of the quality management system had to overcome a number of barriers, for instance, legal obligations of a partnership association, leadership problems, and the fear to loose all hindered implementation. The knowledge of these barriers induces a faster and cheaper implementation of a quality management system in a radiological practice as a foundation of improved quality and competitiveness.

  18. Quality management in a radiological practice

    International Nuclear Information System (INIS)

    Kirsch, Michael; Vogg, Ingrid; Hosten, Norbert; Flessa, Steffen

    2010-01-01

    This paper describes the introduction of a total quality management system in a radiological practice. Certification was based on DIN EN ISO 9001:2000. The implementation of the quality management system had to overcome a number of barriers, for instance, legal obligations of a partnership association, leadership problems, and the fear to loose all hindered implementation. The knowledge of these barriers induces a faster and cheaper implementation of a quality management system in a radiological practice as a foundation of improved quality and competitiveness.

  19. Quality management: does it pay off?

    NARCIS (Netherlands)

    van den Heuvel, J.; Bogers, A.J.J.C.; Does, R.J.M.M.; van Dijk, S.L.; Berg, M.

    2006-01-01

    Health care today is facing serious quality problems while costs are exploding. Quality management therefore becomes a major strategic challenge. In this article, we go through the strategy deployment and quality management process of the Red Cross Hospital in the Netherlands. Growth, efficiency

  20. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Information 4 Responsible Office 4 References 4 Program Description 5 Business Case 5 Program Status 6 Schedule 7 Performance...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS

  1. Development of Quality Management Systems: How Have Disruptive Technological Innovations in Quality Management Affected Organizations?

    Directory of Open Access Journals (Sweden)

    Pasi Hellman

    2013-07-01

    Full Text Available This research investigates the history of quality and development of quality management systems. History of quality is investigated from Hammurabi’s law all the way to today’s reigning quality initiatives including ISO, Six Sigma and Lean manufacturing. In the last chapters the current state of quality management is being examined. The foresight method is also opened up and examined. The Innovator’s dilemma concept, originally presented by Clayton Christensen, is used to analyse how quality management systems have been evolved in the last 100 years. Special emphasis is placed on the US manufacturing in the 1970s and 1980s. Based on the literature, the concept of Innovator’s dilemma and the fall of US manufacturing are merged. The result is a prime example that the Innovator’s Dilemma is a universal phenomenon. The industry leader is trying to maintain its position and do everything right but still it is destined to fail. The causes and effects are being discussed in later chapters.

  2. Quality management in Irish health care.

    Science.gov (United States)

    Ennis, K; Harrington, D

    1999-01-01

    This paper reports on the findings from a quantitative research study of quality management in the Irish health-care sector. The study findings suggest that quality management is what hospitals require to become more cost-effective and efficient. The research also shows that the culture of health-care institutions must change to one where employees experience pride in their work and where all are involved and committed to continuous quality improvement. It is recommended that a shift is required from the traditional management structures to a more participative approach. Furthermore, all managers whether from a clinical or an administration background must understand one another's role in the organisation. Finally, for quality to succeed in the health-care sector, strong committed leadership is required to overcome tensions in quality implementation.

  3. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  4. Leadership and Total Quality Management

    Science.gov (United States)

    1992-04-15

    leadership and management skills yields increased productivity. This paper will focus on the skills required of senior level leaders (leaders at the...publication until it has been cleared by the appropriate mii..-, service or government agency. Leadership and Total Quality Management An Individual Study...llty Codes fAvti1 and/or DltISpecial Abstract AUTHOR: Harry D. Gatanas, LTC, USA TITLE: Leadership and Total Quality Management FORMAT- Individual

  5. Total quality management implementation guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  6. 48 CFR 1851.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1851.205 Section 1851.205 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management...

  7. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  8. 48 CFR 970.2307-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Vehicle Fleet Fuel Efficiency, in all management contracts providing for Contractor management of the motor vehicle fleet. [68 FR 52131, Sept. 2, 2003] Effective Date Note: At 75 FR 57695, Sept. 22, 2010... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency...

  9. Development of accounting quality management system

    Directory of Open Access Journals (Sweden)

    Plakhtii T.F.

    2017-08-01

    Full Text Available Accounting organization as one of the types of practical activities at the enterprise involves organization of the process of implementation of various kinds of accounting procedures to ensure meeting needs of the users of accounting information. Therefore, to improve its quality an owner should use tools, methods and procedures that enable to improve the quality of implementation of accounting methods and technology. The necessity of using a quality management system for the improvement of accounting organization at the enterprise is substantiated. The system of accounting quality management is developed and grounded in the context of ISO 9001:2015, which includes such processes as the processes of the accounting system, leadership, planning, and evaluation. On the basis of specification and justification of the set of universal requirements (content requirements, formal requirements the model of the environment of demands for high-quality organization of the computerized accounting system that improves the process of preparing high quality financial statements is developed. In order to improve the system of accounting quality management, to justify the main objectives of its further development, namely elimination of unnecessary characteristics of accounting information, the differences between the current level of accounting information quality and its perfect level are considered; the meeting of new needs of users of accounting information that have not been satisfied yet. The ways of leadership demonstration in the system of accounting quality management of accounting subjects at the enterprise are substantiated. The relationship between the current level of accounting information quality and its perfect level is considered. The possible types of measures aimed at improving the system of accounting quality management are identified. The paper grounds the need to include the principle of proper management in the current set of accounting

  10. General principles of the quality management

    International Nuclear Information System (INIS)

    Koutaniemi, P.

    2005-01-01

    The objective of the presentation is to outline some general infrastructure of nuclear industry with regard to the quality management; to emphasise significance of safety management as an integral part of the quality management; and to highlight different steps of the management process in a near-time working, at an annual level and as a strategic process

  11. QUALITY MANAGEMENT IN ECOLOGICAL BEEF PRODUCTION

    Directory of Open Access Journals (Sweden)

    Cornelia Petroman

    2012-09-01

    Full Text Available Producing high quality beef asks for the implementation of a performing management of raising cattle ecologically. The main ways of improving beef quality management have a technical nature: sustaina ble grazing management to conserve floral diversity and to obtain ecological beef and rational distribution of the cattle over the grassland to facilitate vegetation recovery and to avoid the setting of invasive species. Implementing a sustainable manageme nt of the resources in the neighborhood of animal farms has beneficial effects on beef quality, brings good economic income through the practice of best beef quality management, protects the environment long - term, and reduces infrastructure expenses thus a voiding the risks of meat contamination.

  12. [Quality management in cardiovascular echography].

    Science.gov (United States)

    Gullace, Giuseppe

    2002-12-01

    The quality management of an organization can be defined as the ability to identify, plan and implement programs of measure, analysis, verification and control that allow to monitor management, resources, activities, processes and output/outcome of the same organization, including the satisfaction of the customers. Whatever the model used, it is demonstrated that the management-quality system, either for professional quality or for organization, turns out to be effective even in the health organizations within and to any level of organizational-structural complexity. The present paper concerns the experience of the Italian Society of Cardiovascular Echography (SIEC) on quality certification, both as a scientific society compared to other health organizations and to cardiovascular echo laboratories, and the definition of minimum requirements for the accreditation of the same laboratories. The model most frequently used for quality management is represented by the ISO 9000: Vision 2000, that is a management model with specific reference to the organization and the customer satisfaction. The model applied to the health structure needs a rapid change in mentality that addresses the operators to define, share and achieve objectives to be brought on by means of an active collaboration, group activity and deep sense of belonging necessary to the attainment of expected objectives. When the model is applied by a scientific society, it is necessary to take into account the different structural and functional organization, the constitution and the operators differing on the point of view of origin, experiences, mentality, and roles. The ISO 9000: Vision 2000 model can be applied also to the cardiovascular echo laboratory which may be compared to a simple organization; for its corrected functioning, SIEC has defined minimal requirements for the accreditation, realization and modalities to carry out and manage quality. The quality system represents a new way of operating of an

  13. 41 CFR 101-26.803-2 - Reporting quality deficiencies.

    Science.gov (United States)

    2010-07-01

    ... Discrepancy Reports Center regarding defective items will be maintained as a quality history file for use in... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Reporting quality... § 101-26.803-2 Reporting quality deficiencies. (a) Quality deficiencies are defined as defects or...

  14. Commitments of Psychological Contracts and Diagnostic Use of Management Control Systems

    OpenAIRE

    Ivan Canan; Gilberto de Andrade Martins; Patrícia Oda

    2016-01-01

    Investigating the commitments the Surveillance Agents from the National Telecommunications Agency (Anatel) made in their psychological contracts and the diagnostic use of the management control system of the entity, this study tested the hypothesis that individuals tend to be more committed to aspects they are charged for within organizations. This is a theoretical and empirical study that assumed that the commitments comprise the part of the belief that individuals develop on reciprocal rela...

  15. 76 FR 76811 - Stakeholders Meeting Regarding Ready Reserve Force (RRF) Ship Manager Contract Program

    Science.gov (United States)

    2011-12-08

    ... Owner/Operator requirement. 12-ship award limit. Definition of Ship Manager ``business entity..., Maritime Security Program, or Tanker Emergency Preparedness Agreement. Small business, sub-contracting vs... affiliation to Rilla Gaither at [email protected] by close of business Monday, December 5, 2011. DATES...

  16. Endogenous Market Structures and Contract Theory. Delegation, principal-agent contracts, screening, franchising and tying

    OpenAIRE

    Etro Federico

    2010-01-01

    I study the role of unilateral strategic contracts for firms active in markets with price competition and endogenous entry. Traditional results change substantially when the market structure is endogenous rather than exogenous. They concern 1) contracts of managerial delegation to non-profit maximizers, 2) incentive principal-agent contracts in the presence of moral hazard on cost reducing activities, 3) screening contracts in case of asymmetric information on the productivity of the managers...

  17. [From quality management to dynamic management through quality: Deployment within a radiotherapy group].

    Science.gov (United States)

    Guerrier, B; Halm, É; Craman, M; Dujols, J-P; Norkowski, J-L; Meynard, K

    2017-10-01

    In 2015, the quality group of the radiotherapy clinic Groupement de Radiothérapie et d'Oncologie des Pyrénées (GROP, Pau, France) decided to review the deployment of its quality approach in order to optimize it continuously. For this, two improvements were proposed: an involvement of process drivers and a material and financial investment in document management software. The implementation of these organizational and managerial provisions enabled us to better cover the requirements of the ISO 9001 standard, the international reference in quality management. Copyright © 2017 Société française de radiothérapie oncologique (SFRO). Published by Elsevier SAS. All rights reserved.

  18. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  19. The determinants of HMOs' contracting with hospitals for bypass surgery.

    Science.gov (United States)

    Gaskin, Darrell J; Escarce, José J; Schulman, Kevin; Hadley, Jack

    2002-08-01

    Selective contracting with health care providers is one of the mechanisms HMOs (Health Maintenance Organizations) use to lower health care costs for their enrollees. However, are HMOs compromising quality to lower costs? To address this and other questions we identify factors that influence HMOs' selective contracting for coronary artery bypass surgery (CABG). Using a logistic regression analysis, we estimated the effects of hospitals' quality, costliness, and geographic convenience on HMOs' decision to contract with a hospital for CABG services. We also estimated the impact of HMO characteristics and market characteristics on HMOs' contracting decision. A 1997 survey of a nationally representative sample of 50 HMOs that could have potentially contracted with 447 hospitals. About 44 percent of the HMO-hospital pairs had a contract. We found that the probability of an HMO contracting with a hospital increased as hospital quality increased and decreased as distance increased. Hospital costliness had a negative but borderline significant (0.10 penetration did not affect the probability of contracting. HMO characteristics also had significant effects on contracting decisions. The results suggest that HMOs value quality, geographic convenience, and costliness, and that the importance of quality and costliness vary with HMO. Greater HMO competition encourages broader hospital networks whereas greater hospital competition leads to more restrictive networks.

  20. Construction quality management principles and good practice

    CERN Document Server

    Watson, Paul

    2011-01-01

    Quality management is essential for facilitating the competitiveness of modern day commercial organizations. Excellence in quality management is a requisite for construction organizations who seek to remain competitive and successful. The challenges presented by competitive construction markets and large projects that are dynamic and complex necessitate the adoption and application of quality management approaches. This textbook is written in line with the ISO 9001:2008 standard and provides a comprehensive evaluation of quality management systems and tools. Their effectiveness in achieving project objectives is explored, as well as applications in corporate performance enhancement. Both the strategic and operational dimensions of quality assurance are addressed by focusing on providing models of best practice. The reader is supported throughout by concise and clear explanations and with self-assessment questions. Practical case study examples show how various evaluative-based quality management systems and t...

  1. 48 CFR 942.270-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 942.270-2 Section 942.270-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 942.270-2 Contract clause. The clause at 952...

  2. Knowledge Management, Total Quality Management and Innovation: A New Look

    Directory of Open Access Journals (Sweden)

    Amir Honarpour

    2012-09-01

    Full Text Available In the present challenging dynamic environment, innovation is considered as a capability that renews the competitive advantage of a company. In recent years, considerable effort has been made to examine the factors that affect innovation in organizations. Knowledge management and total quality management, which play an important role in the contemporary management progress, are among the factors investigated. On the one hand, knowledge management has been recognized as an enabler that can deploy innovation by creating, storing, transferring, and applying knowledge, while on the other hand, the implementation of total quality management practices are addressed as one of the important factors that can influence innovation in a positive way. Lately, although a few researchers have shown some interest in the relationship of total quality management and knowledge management and their have not reached a consensus to conceptualize this relation. Looking at it from the methodological perspective, this problem can be tackled by using the Joint Variance analysis method where it can demonstrate correlation among independent variables and the effect of them on innovation. This study aims to propose a framework that shows how total quality management and knowledge management are reciprocally related to each other and how this affinity can impact innovation.

  3. Total Quality Management Simplified.

    Science.gov (United States)

    Arias, Pam

    1995-01-01

    Maintains that Total Quality Management (TQM) is one method that helps to monitor and improve the quality of child care. Lists four steps for a child-care center to design and implement its own TQM program. Suggests that quality assurance in child-care settings is an ongoing process, and that TQM programs help in providing consistent, high-quality…

  4. Quality management, a directive approach to patient safety.

    Science.gov (United States)

    Ayuso-Murillo, Diego; de Andrés-Gimeno, Begoña; Noriega-Matanza, Concha; López-Suárez, Rafael Jesús; Herrera-Peco, Ivan

    Nowadays the implementation of effective quality management systems and external evaluation in healthcare is a necessity to ensure not only transparency in activities related to health but also access to health and patient safety. The key to correctly implementing a quality management system is support from the managers of health facilities, since it is managers who design and communicate to health professionals the strategies of action involved in quality management systems. This article focuses on nursing managers' approach to quality management through the implementation of cycles of continuous improvement, participation of improvement groups, monitoring systems and external evaluation quality models (EFQM, ISO). The implementation of a quality management system will enable preventable adverse effects to be minimized or eliminated, and promote patient safety and safe practice by health professionals. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  5. 48 CFR 970.1706-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1706... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706-2 Contract clause. The contracting officer shall insert the clause at 48 CFR 52.217-9, Option to Extend the Term of...

  6. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  7. 42 CFR 422.504 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ...) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Application Procedures and Contracts for Medicare Advantage... determinations of amounts payable under the contract. (iv) Properly reflect all direct and indirect costs claimed..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Schedules of...

  8. ISO 9000 and the total quality management models

    OpenAIRE

    Pacios Lozano, Ana Reyes

    1997-01-01

    Establishes the most outstanding differences between the ISO 9000 norms and total quality management as forms or manners of managing quality used in some information services. Compares two models of total quality: European Foundation far Quality Management and Malcolm Baldrige Awards.

  9. 7 CFR 1717.608 - RUS approval of contracts.

    Science.gov (United States)

    2010-01-01

    ... the contracts or arrangements, and regardless of whether or not a Federal power marketing agency is a party to any of them. (d) System management and maintenance contracts. RUS approval of contracts for the management and operation of a borrower's electric system or for the maintenance of the electric system is...

  10. THE EXISTING BARRIERS IN IMPLEMENTING TOTAL QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Salagean Horatiu Catalin

    2014-07-01

    Full Text Available In the current market economy, companies are constantly struggling to achieve a sustained competitive advantage that will enable them to improve performance, which results in increased competitiveness, and of course, profit. Among the few competitive advantages that can become sustainable competitive advantages, quality plays a crucial role. Recent research shows that about 90% of buyers in the international market, consider quality as having at least equal importance with price in making the decision to purchase. In the opinion of some specialists in economic theory and practice, total quality refers to the holistic approach of quality, which actually means, addressing all aspects of economic and social development and technical of quality. Thus, the holistic approach of quality at organisation-wide involves procedural approach of quality, in this respect, the study focuses on this type of quality approach, i.e. the procedural approach, taking into account the strategic aspects of the continuous improvement of quality, which means in fact, the quality management. Total Quality Management is seen as a way to transform the economies of some countries to be more competitive than others. However, Total Quality Management brings not and will not produce results overnight, it is not a panacea for all the problems facing the organization. Total Quality Management requires a change in organizational culture, which must focus on meeting customer expectations and increasing the involvement of all employees to meet this objective, as an expression of the ethics of continuous improvement. In general, research on quality aiming identify why an organization should adopt the principles of total quality management, but attempts to identify the failing companies' attempts to implement total quality management principles are not so visible. Concerns companies to introduce quality management systems are becoming more pronounced, therefore, in this study we try to

  11. Total Quality Management in Education. Second Edition.

    Science.gov (United States)

    Sallis, Edward

    Quality is at the top of most agendas, and improving quality is probably the most important task facing any institution. In addition, quality is difficult to define or measure. This book, the second edition of "Total Quality Management in Education," introduces the key concepts of Total Quality Management (TQM) and demonstrates how they…

  12. Concepts of total quality management in radiology

    International Nuclear Information System (INIS)

    Pratik Kumar

    2003-01-01

    Quality is one of the touch-stones to determine the competitive advantage for a service, product or company. Total Quality Management has a large ambit, which encompasses not only the quality of images and services producing these images, but also the customers satisfaction. In health care patients satisfaction is divided into three parts: patient quality, professional quality and management quality

  13. QUALITY OF MANAGEMENT IN PUBLIC ADMINISTRATION

    Directory of Open Access Journals (Sweden)

    Ileana (BĂDULESCUANASTASE

    2015-04-01

    Full Text Available This paper shows the emmergence of strong aspects that require a deep transformation of the organization through the implementation of the Quality and management. We start from knowing the status of the organization, the environment, and through continuous improvement, the implementation of the Quality of management will try to reach stages closer to excellence. In this sense, the applyable practice in Public Administration must start from something elementary and simple, to allow the realization of some improvements, with a modern administration, with a number of considerable tasks. The introduction of a system of Quality management must be the decision of superior management, and the idea that sustains the arguments must be the following: the growth of productivity, the raise of income, the improvement of the image, the growth of competitiveness, the reducing of costs, the improvement of the environment. This way, reductions of consumptions in the Public Administration through improvements in the Quality of management must be determined.

  14. Quality assurance and management

    International Nuclear Information System (INIS)

    Newcomb, W.E.

    1989-01-01

    This paper traces the evolution of the quality assurance program of an office of waste management development (OWTD). The program's needs and commitment are examined. The author reports on the role of program and technical managers in such a program

  15. Translation and Quality Management

    DEFF Research Database (Denmark)

    Petersen, Margrethe

    1996-01-01

    theory which would seem likely to be of interest in this connection and section 2. gives a linguist's introduction to the part of the area of quality management which I consider relevant for present purposes. Section 3. is devoted to the case study of a small translation firm which has been certified......The aim of this article is to consider the issue of quality in translation. Specifically, the question under consideration is whether quality assurance in relation to translation is feasible and, if so, what some of the implications for translation theory, translation practice and the teaching...... of translation would be. To provide a backdrop against which the issue may be discussed, I present an overview of the two areas which seem most likely to hold potential answers, viz., that of translation theory and that of quality management. Section 1. gives a brief outline of some contributions to translation...

  16. Quality control in manufacture of lead boron polyethylene plate

    International Nuclear Information System (INIS)

    Wu Ying

    2008-01-01

    For the quality assurance management in the manufacture of lead boron polyethylene plate,target shall be defined and planning shall be conducted first; personnel shall be trained to improve the execution force; institutional system shall be continuously upgraded and environment protection shall be strengthened.Quality management has achieved excellent result, with qualification rate for contracts reaches 100%, to ensure successful production. (author)

  17. Implementation of Good Clinical Laboratory Practice (GCLP) guidelines within the External Quality Assurance Program Oversight Laboratory (EQAPOL).

    Science.gov (United States)

    Todd, Christopher A; Sanchez, Ana M; Garcia, Ambrosia; Denny, Thomas N; Sarzotti-Kelsoe, Marcella

    2014-07-01

    The EQAPOL contract was awarded to Duke University to develop and manage global proficiency testing programs for flow cytometry-, ELISpot-, and Luminex bead-based assays (cytokine analytes), as well as create a genetically diverse panel of HIV-1 viral cultures to be made available to National Institutes of Health (NIH) researchers. As a part of this contract, EQAPOL was required to operate under Good Clinical Laboratory Practices (GCLP) that are traditionally used for laboratories conducting endpoint assays for human clinical trials. EQAPOL adapted these guidelines to the management of proficiency testing programs while simultaneously incorporating aspects of ISO/IEC 17043 which are specifically designed for external proficiency management. Over the first two years of the contract, the EQAPOL Oversight Laboratories received training, developed standard operating procedures and quality management practices, implemented strict quality control procedures for equipment, reagents, and documentation, and received audits from the EQAPOL Central Quality Assurance Unit. GCLP programs, such as EQAPOL, strengthen a laboratory's ability to perform critical assays and provide quality assessments of future potential vaccines. © 2013.

  18. 48 CFR 244.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 244.403... OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 244.403 Contract clause. (1) 252.225-7009, Restriction on Acquisition of...

  19. Quality Management and Business Excellence

    Directory of Open Access Journals (Sweden)

    Vasile Dinu

    2017-02-01

    Full Text Available An excellent organization involves much more than the implementation and the certification of one or more models of management systems. It means developing techniques and tools of busin excellence which lead the organization to outstanding performance on quality, costs and deadlines in order to meet the expectations of all their stakeholders. Such an approach is needed especially in the context of an economy marked by globalization, extremely complex and dynamic that causes spectacular changes in the business environment by integrating quality management principles on purpose to develop sustainable excellence. Not coincidentally, the new edition of the European excellence model EFQM integrates for the first time the principle "managing with agility“ with the principles: “developing organizational capability”, “harnessing creativity & innovation”, “adding value to the customer”, “sustaining outstanding results” for the organization and “creating a sustainable future”. Also, the new model for quality management system defined by the edition from 2015 of ISO 9000 standards , promotes the process-based approach, incorporating the cycle "Plan - Do − Check − Act" (PDCA and the risk-based thinking, focusing on organizational change and innovation, in order to ensure a sustainable performance in business. Noteworthy is the endeavor for the development of a high-level structure for all international standards for management systems, aiming to harmonize these standards to facilitate the implementation of integrated management systems (quality − environment − security − social responsibility.

  20. Implementation of the ISO 9001 quality management system - process, impact and benefits

    Directory of Open Access Journals (Sweden)

    Aleksandar Ž. Drenovac

    2013-10-01

    Full Text Available Modern business is characterized by greater and greater market competition through all business areas and all activities. Establishment of market positions is a very important element of business activities in every organization. Quality of products and/or services provides recognizability at market and raising of ratings. Implementation of the ISO 9001 quality management system opens positions for secure national and international markets; it is also an identifier of an efficiently and effectively process-wise organized system in an organization. Introduction An increase of impact of quality and demands for ensuring quality before contract approvals has been visible lately. All vendors at the multinational market must ensure confidence in the quality of their products or services in order to satisfy customer demands which is an ultimate goal. Organizations which have the certificated ISO 9001 standard are known for their persistence and reliability, so they reach high reputation by applying  the standard. Implementation of a quality management system Implementation of a quality management system is done by system engineering, as a process based on a top management decision. It can be applied through the engagement of professionals from within the organization, as well as through outsourced consultants. The process is based on the PDCA cycle and the eight principles of quality management in an ISO 9001 organization. Defining assignments in accordance with the standard The Quality Manual, as a document which contains quality aims and through which a complete model of the quality management system is described, should be an initial element for the process of implementing a quality management system. It contains an overview of all procedures and directions used for achieving quality policy, i.e. for the implementation of a quality management system in every part of a business system. Implementation of procedures When the Quality manual is created

  1. IMPROVING QUALITY MANAGEMENT IN PANIFICATION

    Directory of Open Access Journals (Sweden)

    Cornelia Petroman

    2010-12-01

    Full Text Available Consumers of panification products (as well as consumers of any other type of product or service are concerned about the quality of the products they purchase. Implementing the quality management system in the food industry is not compulsory, but it can bring about numerous, palpable benefits, particularly in reducing the amount of acryl amide. It is a modern system allowing the management analysis aiming at checking and reaching the goals to define new objectives, and the continuous improvement of the quality of processes and products.

  2. Total quality management in hotel industry

    OpenAIRE

    Mitreva, Elizabeta; Saneva, Dusica; Miteva, Natasa

    2017-01-01

    Total quality management (TQM) is a systematic management approach aiming at continuous increase of the value offered to consumers through improvement of service quality. In hotel industry, success is achieved through service quality, which stands as a key factor for sustainability in the twenty-first century. Nowadays, quality is the basic factor for survival on the market, better competition, and greater profitability. TQM is a process that starts and ends with the consumer. The aim of this...

  3. Data quality management and data cleaning

    OpenAIRE

    Podobnikar , Uroš

    2016-01-01

    Today´s enterprises are often challenged by managing a large amount of data used in their business operation. Assurance and maintenance of adequate data quality level are important aspects of data quality management due to many reasons. On the one hand, the adequate data quality level represents a competitive advantage, and on the other hand, low data quality level leads to many unpleasant consequences. In the past, frameworks, methodologies, and tools to help ensuring adequate level of da...

  4. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  5. Quality Management. Chapter 19

    Energy Technology Data Exchange (ETDEWEB)

    Hiles, P. A. [Glan Clwyd Hospital, Bodelwyddan (United Kingdom); McLean, I. D. [International Atomic Energy Agency, Vienna (Austria); Christofides, S. [New Nicosia General Hospital, Nicosia (Cyprus)

    2014-09-15

    This chapter introduces the principles and definitions of quality management systems (QMSs) for radiology facilities, to give a framework to assist in the setting up of such systems and to emphasize the role of the medical physicist in this context. While there is a diversity of terms currently in use to describe quality processes both generally and specifically within radiology, there is broad agreement that the effective management of radiation medicine services demands a quality culture that includes a systematic approach to the elements that govern the delivery of that service. Therefore, the concept of quality assurance (QA) within the radiological facility covers, in its widest sense, all those factors that affect the intended outcome, that is, a clinical diagnosis. The medical physicist has an important role in the overall QMS, especially, but not exclusively, with respect to the equipment performance. A worked example of a quality control (QC) programme is included at the end of the chapter, to demonstrate the depth of detail and involvement of the medical physicist.

  6. 48 CFR 970.0470-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0470... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0470-2 Contract clause. The contracting officer shall insert the clause at 970.5204-2, Laws, Regulations, and DOE...

  7. 48 CFR 970.0371-9 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0371... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-9 Contract clause. The contracting officer shall insert the clause at 970...

  8. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  9. 48 CFR 970.0370-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0370... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370-2 Contract clause. (a) The contracting officer shall insert the clause at 970...

  10. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  11. Managing water utility financial risks through third-party index insurance contracts

    Science.gov (United States)

    Zeff, Harrison B.; Characklis, Gregory W.

    2013-08-01

    As developing new supply capacity has become increasingly expensive and difficult to permit (i.e., regulatory approval), utilities have become more reliant on temporary demand management programs, such as outdoor water use restrictions, for ensuring reliability during drought. However, a significant fraction of water utility income is often derived from the volumetric sale of water, and such restrictions can lead to substantial revenue losses. Given that many utilities set prices at levels commensurate with recovering costs, these revenue losses can leave them financially vulnerable to budgetary shortfalls. This work explores approaches for mitigating drought-related revenue losses through the use of third-party financial insurance contracts based on streamflow indices. Two different types of contracts are developed, and their efficacy is compared against two more traditional forms of financial hedging used by water utilities: Drought surcharges and contingency funds (i.e., self-insurance). Strategies involving each of these approaches, as well as their use in combination, are applied under conditions facing the water utility serving Durham, North Carolina. A multireservoir model provides information on the scale and timing of droughts, and the financial effects of these events are simulated using detailed data derived from utility billing records. Results suggest that third-party index insurance contracts, either independently or in combination with more traditional hedging tools, can provide an effective means of reducing a utility's financial vulnerability to drought.

  12. Quality Management of Measurements incl. Documentation

    DEFF Research Database (Denmark)

    Tosello, Guido; De Chiffre, Leonardo

    2004-01-01

    -Nürnberg, Chair for Quality Management and Manufacturing-Oriented Metrology (Germany). 'Metro-E-Learn' project proposes to develop and implement a coherent learning and competence chain that leads from introductory and foundation e-courses in initial manufacturing engineering studies towards higher....... Machine tool testing 9. The role of manufacturing metrology for QM 10. Inspection planning 11. Quality management of measurements incl. Documentation 12. Advanced manufacturing measurement technology The present report (which represents the section 11 - Quality management of measurements incl....... Documentation – of the e-learning system) is part of the contribution of the Department for Manufacturing Engineering and Management (IPL) / Centre for Geometrical Metrology (CGM) at the Technical University of Denmark to the MINERVA EU project mentioned above....

  13. KNOWLEDGE, INTELECTUAL CAPITAL AND QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2009-12-01

    Full Text Available From the contemporary change management paradigm and new, knowledge-based economy, we emphasize the impact of advanced managerial tools. As evidenced in practice, simultaneous implementation of several management approaches, concepts and methods brings about more integral corporate success. We advocate integration of up-to-date approaches - knowledge management (KM and intellectual capital management (ICM as well as balanced scorecard (BSC under the "conceptional umbrella" of quality management, i.e. quality management system (QMS and total quality management (TQM. Interrelating elements of these management concepts through comparison of respective characteristics, differences and similarities, connections and complementary activities, we establish relations and interdependence which result in synergy when applied concurrently. QMS implementation (in accordance with ISO 9000 standard series, enroute to TQM, KM is improved, intellectual capital enlarged (via knowledge, skills, motivation, management systems, procedures, information and product flow, customer and other stakeholder relations and application of BSC facilitated. Conversely, KM and BSC improve opportunities for attaining organisational and business excellence. All mentioned concepts can be viewed as facets of modern integral management model, in continual dynamic interaction that brings about a potential for improved competitive advantage and business performance.

  14. Business process quality management

    NARCIS (Netherlands)

    Reijers, H.A.; Mendling, J.; Recker, J.; Brocke, vom J.; Rosemann, M.

    2010-01-01

    Abstract Process modeling is a central element in any approach to Business Process Management (BPM). However, what hinders both practitioners and aca demics is the lack of support for assessing the quality of process models — let alone realizing high quality process models. Existing frameworks are

  15. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  16. Acceptance of selective contracting: the role of trust in the health insurer.

    Science.gov (United States)

    Bes, Romy E; Wendel, Sonja; Curfs, Emile C; Groenewegen, Peter P; de Jong, Judith D

    2013-10-02

    In a demand oriented health care system based on managed competition, health insurers have incentives to become prudent buyers of care on behalf of their enrolees. They are allowed to selectively contract care providers. This is supposed to stimulate competition between care providers and both increase the quality of care and contain costs in the health care system. However, health insurers are reluctant to implement selective contracting; they believe their enrolees will not accept this. One reason, insurers believe, is that enrolees do not trust their health insurer. However, this has never been studied. This paper aims to study the role played by enrolees' trust in the health insurer on their acceptance of selective contracting. An online survey was conducted among 4,422 people insured through a large Dutch health insurance company. Trust in the health insurer, trust in the purchasing strategy of the health insurer and acceptance of selective contracting were measured using multiple item scales. A regression model was constructed to analyse the results. Trust in the health insurer turned out to be an important prerequisite for the acceptance of selective contracting among their enrolees. The association of trust in the purchasing strategy of the health insurer with acceptance of selective contracting is stronger for older people than younger people. Furthermore, it was found that men and healthier people accepted selective contracting by their health insurer more readily. This was also true for younger people with a low level of trust in their health insurer. This study provides insight into factors that influence people's acceptance of selective contracting by their health insurer. This may help health insurers to implement selective contracting in a way their enrolees will accept and, thus, help systems of managed competition to develop.

  17. Acceptance of selective contracting: the role of trust in the health insurer

    Science.gov (United States)

    2013-01-01

    Background In a demand oriented health care system based on managed competition, health insurers have incentives to become prudent buyers of care on behalf of their enrolees. They are allowed to selectively contract care providers. This is supposed to stimulate competition between care providers and both increase the quality of care and contain costs in the health care system. However, health insurers are reluctant to implement selective contracting; they believe their enrolees will not accept this. One reason, insurers believe, is that enrolees do not trust their health insurer. However, this has never been studied. This paper aims to study the role played by enrolees’ trust in the health insurer on their acceptance of selective contracting. Methods An online survey was conducted among 4,422 people insured through a large Dutch health insurance company. Trust in the health insurer, trust in the purchasing strategy of the health insurer and acceptance of selective contracting were measured using multiple item scales. A regression model was constructed to analyse the results. Results Trust in the health insurer turned out to be an important prerequisite for the acceptance of selective contracting among their enrolees. The association of trust in the purchasing strategy of the health insurer with acceptance of selective contracting is stronger for older people than younger people. Furthermore, it was found that men and healthier people accepted selective contracting by their health insurer more readily. This was also true for younger people with a low level of trust in their health insurer. Conclusion This study provides insight into factors that influence people’s acceptance of selective contracting by their health insurer. This may help health insurers to implement selective contracting in a way their enrolees will accept and, thus, help systems of managed competition to develop. PMID:24083663

  18. Quality management principles and practices impact on the companies' quality performance

    OpenAIRE

    Barros, Síria Alves; Sampaio, Paulo; Saraiva, Pedro

    2014-01-01

    Publicado em "Proceedings of the 1st International Conference on Quality Engineering and Management" Purpose - The aim of this paper is to expose the conceptual model which pretends to reflect the relationship between the use and implementation of quality management principles and practices and their impact on the companies’ quality performance. Design/methodology/approach – Based on the literature review carried out, we have identified the most common and used quality manageme...

  19. Statistical quality management

    NARCIS (Netherlands)

    Laan, van der P.

    1992-01-01

    Enkele algemene opmerkingen worden gemaakt over statistische kwaliteitszorg. Totale of Integrale Kwaliteitszorg (Total Quality Management) wordt kort besproken. Voordracht gehouden op 21 oktober 1992 voor leden van de studentenvereniging GEWIS voor Wiskunde en Informatica.

  20. Urban air quality management. V. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This is the first in a series of reports commissioned by the International Petroleum Industry Environmental Conservation Association (IPIECA) to represent members' views on the management of urban air quality in the growing cities in developing countries. In this report, a general, science based framework is provided as a basis for understanding the nature of the problem in any specific urban area, the range of solutions that might be available, and the potential impact of each solution and its least cost privatisation. The topics covered are: a process for urban air quality management; setting air quality targets; a structured approach to the assessment of current and future air quality modelling methodologies; identification and collation of air quality model input data; development of socio-economic scenarios -long-term trend forecasting; cost effectiveness studies; the IPIECA approach to urban air quality management - development of partnerships; encouraging commitment to implementation of programme recommendations. (7 figures; 2 tables; 18 references). (UK)

  1. Colour Management as a Precondition of Quality

    Directory of Open Access Journals (Sweden)

    Stefan Brues

    2004-12-01

    Full Text Available Colour management technology has reached a high level of maturity. Only ten years after it first appeared on the market, ICC colour profiles have become indispensable in modern premedia. It can be said without exaggeration that colour management has revolutionised digital proof printing. A whole range of newcomers in the print industry supplier community offer an intelligent combination of a PostScript RIP with integral colour management functions. The quality of these low-priced proofing systems has now reached such a high level that even discerning customers accept such digital proofs as contract proofs. Modular proofing solutions are regularly to be found among the leaders in the digital proofer tests.Working with colour profiles and profiled workflows is still a major problem area. It is no mere chance that notably digital proofing is the field in which users work with colour profiles in virtually all systems, since applications here are locally limited.An important step for the widespread use of colour management technology is the now very extensive implementation of ICC mechanisms in application programs such as Adobe Photoshop. Version 7 is regarded as a model of well thought-out ICC-based colour management implementation. As Microsoft has neglected the ICC standard in recent years, Adobe has created its own colour management interface, called ACE. Based on the ICC standard, it is regarded by many experts as a reference implementation. Adobe products, which are so important for the graphic arts industry, now contain a standard colour management platform across all supported operating systems. Incompatibilities at system level can now be virtually ruled out, at least across the Adobe product line, including the important interfaces with PostScript and PDF.Modern prepress technology is set to move ever further away from exclusive print production for standardised offset print. Multiple use of production data is still at an early stage

  2. Approaches to the quality management in tourism services

    Directory of Open Access Journals (Sweden)

    Ida Vajčnerová

    2010-01-01

    Full Text Available The paper focuses on the systems of quality used in tourism services. It introduces approaches based on observing facility standards that are used in the Czech Republic in the area of accommodation and boarding services (Hotelstars, HACAP, then ISO standards of 9000 group and the systems of complex quality management. Within the frame of complex quality management it deals with the model of exceptionality EFQM (European Foundation for Quality Management and the European integrated system of quality IQM (Integrated Quality Management in more detail. The necessity to support the quality of tourism services is pointed out in the paper, as well as to create a national system of quality or possibly using already existing European systems of international character.

  3. Total Quality Management. A Selected Bibliography

    Science.gov (United States)

    1994-03-01

    and Publow, Mark. "Understanding and Managing Authority Relationships : Guidelines for Supervisors and Sub- ordinates." QUALITY PROGRESS, Vol. 25...NEXT OPERATION AS CUSTOMER (NOAC): HOW TO IMPROVE QUALITY, COST AND CYCLE TIME IN SERVICE OPERATIONS. New York: American Management Association, 1991...Keith. HORIZONTAL MANAGEMENT : BEYOND TOTAL CUSTOMER SATISFACTION. New York: Lexington Books, 1991. 211pp. (HD66 D45 1991) Donnelly, James H., Jr. CLOSE

  4. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes.

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth N J; Taris, Toon W

    2012-01-01

    Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable trajectories, whereas upward trajectories were expected to be for the better and downward trajectories to be for the worse (Hypothesis 1). As turnover theories suggest that this hypothesis may only apply to workers who do not change employer, we also examined these contract trajectories stratified for a change of employer (Hypothesis 2). Drawing on the 2007 and 2008 waves of the Netherlands Working Conditions Cohort Study (N=9,688), repeated measures analysis of covariance showed little across-time change in the criterion variables, thus largely disconfirming our first hypothesis. These results could (at least partly) be explained by employer change; this was generally associated with improved scores among all contract trajectories (Hypothesis 2). However, workers receiving a less stable contract from the same employer were found to be at risk for health and well-being problems. Segmentation theory-based assumptions on contract trajectories primarily apply to stable and downward contract trajectories at the same employer, whereas assumptions from turnover theories better apply to contract trajectories combined with a change of employer. Future research should focus more closely on factors predicting "involuntary" downward trajectories into precarious temporary employment or unemployment.

  5. [QUIPS: quality improvement in postoperative pain management].

    Science.gov (United States)

    Meissner, Winfried

    2011-01-01

    Despite the availability of high-quality guidelines and advanced pain management techniques acute postoperative pain management is still far from being satisfactory. The QUIPS (Quality Improvement in Postoperative Pain Management) project aims to improve treatment quality by means of standardised data acquisition, analysis of quality and process indicators, and feedback and benchmarking. During a pilot phase funded by the German Ministry of Health (BMG), a total of 12,389 data sets were collected from six participating hospitals. Outcome improved in four of the six hospitals. Process indicators, such as routine pain documentation, were only poorly correlated with outcomes. To date, more than 130 German hospitals use QUIPS as a routine quality management tool. An EC-funded parallel project disseminates the concept internationally. QUIPS demonstrates that patient-reported outcomes in postoperative pain management can be benchmarked in routine clinical practice. Quality improvement initiatives should use outcome instead of structural and process parameters. The concept is transferable to other fields of medicine. Copyright © 2011. Published by Elsevier GmbH.

  6. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  7. Developing a TQM quality management method model

    NARCIS (Netherlands)

    Zhang, Zhihai

    1997-01-01

    From an extensive review of total quality management literature, the external and internal environment affecting an organization's quality performance and the eleven primary elements of TQM are identified. Based on the primary TQM elements, a TQM quality management method model is developed. This

  8. Total quality management and nursing: a shared vision.

    Science.gov (United States)

    Morey, W

    1996-09-01

    The application of the Total Quality Management (TQM) philosophy within the health care sector would enhance the development of nursing power, leadership and knowledge. TQM challenges conventional management techniques as it requires a participative management style in order to be effective. There are many potential benefits for nurses, when quality assurance monitoring within a hierarchical management structure, is replaced with a focus on continuous quality improvement by every member of staff. These benefits are described within the context of both organisational and personal commitment to Total Quality Management.

  9. Quality Management in Slovenian Education Programmes

    Directory of Open Access Journals (Sweden)

    Milena Alič

    2015-05-01

    Full Text Available Product and service quality, effective process management, continuous improvement and innovation are some essential conditions for making a successful business. They are often emphasised by managers of successful organizations, by authors of professional and scientific papers and even by politicians and journalists. Quality management standards and models, such as ISO 9001 and EFQM model appeared in assistance to the needs of organisations to assure stable product and service quality, to improve it and to make the production process and its supporting processes effective. It has been 28 years since the standard ISO 9001 appeared. Now it is the most widely spread global standard implemented in more than 1.100.000 organizations worldwide. If quality management was proved to be an important approach to make organizations operate better and thus to contribute to well-being of the society, it would be expected that it is somehow included in our regular school programmes on all the levels. We expect that learning and living quality approaches in childhood and youth would be the least costly way to improve the culture of quality in the society and to implement it in our organizations as well. The paper gives some insight in the situation by searching for quality management related programmes and approaches in our primary, secondary and tertiary school programmes. The purpose of this paper is only to highlight the issue of teaching for quality in our regular education programmes – just to become aware of it and to find some improvement opportunities. There should be still some more detailed research on this topic to give strong suggestions.

  10. Optimal Management of Supply Disruptions when Contracting with Unreliable, Risk-averse, Suppliers

    OpenAIRE

    Parlane, Sarah; Tsai, Ying-Yi

    2017-01-01

    This paper investigates the optimal management of supply disruptions by a manufacturer who uses order inflation and/or investments in process reliability when contracting two risk-averse suppliers. We consider that these investments can be subject to moral hazard. Technically we solve a newsvendor optimization problem using a random capacity model of disruption. In such a model, the order size does not affect the average production but impacts the probability of disruption. When investments a...

  11. Quality management in radiation protection

    International Nuclear Information System (INIS)

    Baehrle, H.G.

    1997-01-01

    Quality Management in Radiation Protection Quality management (QM) in the field of Radiation Protection was discussed in a previous issue (2/97) using the example of QMS at the Paul Scherrer Institut (PSI). The present article describes the major features involved in the establishment of a functional QMS. Establishment of the QMS lead to a deeper understanding of administrative and operational aspects of the working methods involved. (orig.) [de

  12. Quality Management and Juran’s Legacy

    NARCIS (Netherlands)

    Bisgaard, S.

    2007-01-01

    Keywords: Quality Engineering Six Sigma Design for Six Sigma Abstract: Quality management provides the framework for the industrial application of statistical quality control, design of experiments, quality improvement and reliability methods. It is therefore helpful for quality engineers and

  13. Building Psychological Contracts in Security-Risk Environments

    DEFF Research Database (Denmark)

    Ramirez, Jacobo; Madero, Sergio; Vélez-Zapata, Claudia

    2015-01-01

    This paper examines the reciprocal obligations between employers and employees that are framed as psychological contracts in security-risk environments. A total of 30 interviews based on psychological contract frameworks, duty-of-care strategies in terms of human resource management (HRM) systems...... and the impacts of narcoterrorism on firms were conducted with human resources (HR) personnel, line managers and subordinates at eight national and multinational corporations (MNCs) with subsidiaries in Colombia and Mexico. Our findings generally support the existence of a relational psychological contract in our...... sample. Duty-of-care strategies based on both HRM systems and the sensitivities of HR personnel and line managers to the narcoterrorism context, in combination with both explicit and implicit security policies, tend to be the sources of the content of psychological contracts. We propose a psychological...

  14. Do competition and managed care improve quality?

    Science.gov (United States)

    Sari, Nazmi

    2002-10-01

    In recent years, the US health care industry has experienced a rapid growth of managed care, formation of networks, and an integration of hospitals. This paper provides new insights about the quality consequences of this dynamic in US hospital markets. I empirically investigate the impact of managed care and hospital competition on quality using in-hospital complications as quality measures. I use random and fixed effects, and instrumental variable fixed effect models using hospital panel data from up to 16 states in the 1992-1997 period. The paper has two important findings: First, higher managed care penetration increases the quality, when inappropriate utilization, wound infections and adverse/iatrogenic complications are used as quality indicators. For other complication categories, coefficient estimates are statistically insignificant. These findings do not support the straightforward view that increases in managed care penetration are associated with decreases in quality. Second, both higher hospital market share and market concentration are associated with lower quality of care. Hospital mergers have undesirable quality consequences. Appropriate antitrust policies towards mergers should consider not only price and cost but also quality impacts. Copyright 2002 John Wiley & Sons, Ltd.

  15. Food quality management : A techno-managerial approach

    NARCIS (Netherlands)

    Luning, P.A.; Marcelis, W.J.; Jongen, W.M.F.

    2002-01-01

    The book focuses on consumer-driven Quality Management in food production systems using a product-based approach. It integrates organizational and technological aspects of food product quality into one techno-managerial concept and it presents an integrated view of how Quality Management is to be

  16. Implications of business ethics for quality management

    NARCIS (Netherlands)

    Fisscher, O.A.M.; Nijhof, A.H.J.

    2005-01-01

    In the academic world research in the fields of quality management and business ethics are often separated. One reason for this is that the origins are very different; business ethics stemming from philosophy while quality management has developed from management studies. With the present

  17. Value chain analysis in quality management context

    Directory of Open Access Journals (Sweden)

    Popescu, M.

    2011-01-01

    Full Text Available Based on the description of value chain analysis, which is a strategic management tool attributed to Michel Porter, the paper aims to demonstrate that quality management applies this method, under specific forms. The paper's specific objectives are: to redefine the functions of value chain analysis in the context of quality management; to clarify the significance and the possibilities of measuring the value added; to present management tools and techniques needed to control and systematically improve performance. Research methodology is based on examples, previous studies and a case study that reveals the diversity of indicators for measuring the value added and analysis tools used in quality management.

  18. On Quality of Service Management

    National Research Council Canada - National Science Library

    Lee, Chen

    1999-01-01

    A quality of service (QoS) management framework for systems is presented that satisfies application needs along multiple dimensions such as timeliness, reliability, cryptographic security and other application specific quality requirements...

  19. Quality Management Principles in the Management of Shipboard Discharges

    Directory of Open Access Journals (Sweden)

    Vjekoslav Koljatić

    2006-05-01

    Full Text Available Environmental control of vessels is a management functionthat requires applied technology, training and diligentmanagement. Quality Management is a tool for developing environmentalprograms to control corporate environmental exposures.The management of environmental regulations, requirementsand concerns requires a systematic approach. QualityManagement (QM embodies principles of policy delineation,operations accountability, documentation and review.These principles are all transferable to most aspects of shipmanagement. Properly implemented, they assign respective responsibilitiesfor both shore side and shipboard staff Both ISMand IS0-9000 Certification requirements embody the principlesof QM as requirements for certification. If, however, onelooks beyond the certification process, these principles makegood business sense. The benefits of QM are both economic aswell as assisting in corporate risk management. This paper willfocus on the risk management benefits as they apply of environmentalhealth programs in the marine environment includingports.

  20. Service quality for facilities management in hospitals

    CERN Document Server

    Sui Pheng, Low

    2016-01-01

    This book examines the Facilities Management (FM) of hospitals and healthcare facilities, which are among the most complex, costly and challenging kind of buildings to manage. It presents and evaluates the FM service quality standards in Singapore’s hospitals from the patient’s perspective, and provides recommendations on how to successfully improve FM service quality and achieve higher patient satisfaction. The book also features valuable supplementary materials, including a checklist of 32 key factors for successful facilities management and another checklist of 24 service attributes for hospitals to achieve desirable service quality in connection with facilities management. The book adopts a unique approach of combining service quality and quality theory to provide a more holistic view of how FM service quality can be achieved in hospitals. It also integrates three instruments, namely the SERVQUAL model, the Kano model and the QFD model to yield empirical results from surveys for implementation in hosp...

  1. An Introduction to Quality Management: Selected Readings.

    Science.gov (United States)

    total quality management (TQM). Through the kind permission of a number of publishers, we have been able to reproduce here some key articles about...TQM. It is not the intent of this technical note to provide a comprehensive study of quality management , but rather to aid in planning for an...implementation of the Deming approach to TQM. Although the Navy aviation community chose the Deming approach to quality management , as reflected in the selected

  2. QUALITY MANAGEMENT AND INTEGRATED TOTAL QUALITY IN SPANISH MINING: RESULTS OF AN EMPIRICAL STUDY

    OpenAIRE

    ESCANCIANO, CARMEN; IGLESIAS-RODRÍGUEZ, FRANCISCO-JAVIER

    2012-01-01

    This paper presents the results of an empirical study conducted in Spain among mining companies that hold ISO 9001 certification. This study aimed at reflecting upon quality management in Spanish mining; and discovering whether the certification of a quality management system provides companies with a framework for integrating total quality management with other management systems, such as environmental management or occupational health and safety management. En este artículo se presentan ...

  3. Quality Management Program

    International Nuclear Information System (INIS)

    1991-10-01

    According to section 35.32, ''Quality Management Program,'' of 10 CFR Part 35, ''Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010

  4. Government/Andra 2001/2004 quadrennial contract

    International Nuclear Information System (INIS)

    2002-01-01

    The French national agency for the management of radioactive wastes (ANDRA) was created on December 31, 1991 with the objective of carrying out research works in the domain of the long term management of radioactive wastes: research programs, management of waste disposal facilities, realisation and exploitation of underground laboratories for the design and setting up of new disposal facilities, definition of safety rules, conditioning and disposal specifications, inventory and localization of all radioactive wastes inside the French territory. This documents aims at defining the missions of the Andra for the 2001-2004 era, ten years after its creation: classification of radioactive wastes; positioning and missions of the Agency; objectives for the industrial mission (safety, storage and disposal solutions, management solutions, continuation of the inventory work, optimization of disposal costs, memory and surveillance); objectives of the research mission (high scientific level projects, structuration of researches, reinforcement of the coordination between the 3 axes of the 1991 law, exploitation and management of underground laboratories, spreading out of scientific results); objectives of the information mission (inventory and localization of wastes, realization of a reference inventory, contribution to the local information, proposal for a clear and verifiable information); international policy objectives (promotion of contacts and cooperations with foreign partners, representation of the Agency among the big international organizations, punctual missions for the valorization of the Agency competencies); evaluation and quality assurance inside the Agency (safety evaluation, scientific and technical evaluation, quality policy and environment, ethics, contract follow up). (J.S.)

  5. Total Quality Management in Higher Education.

    Science.gov (United States)

    Sherr, Lawrence A.; Lozier, G. Gredgory

    1991-01-01

    Total Quality Management, based on theories of W. Edward Deming and others, is a style of management using continuous process improvement characterized by mission and customer focus, a systematic approach to operations, vigorous development of human resources, long-term thinking, and a commitment to ensuring quality. The values espoused by this…

  6. 2015/2016 Quality Risk Management Benchmarking Survey.

    Science.gov (United States)

    Waldron, Kelly; Ramnarine, Emma; Hartman, Jeffrey

    2017-01-01

    This paper investigates the concept of quality risk management (QRM) maturity as it applies to the pharmaceutical and biopharmaceutical industries, using the results and analysis from a QRM benchmarking survey conducted in 2015 and 2016. QRM maturity can be defined as the effectiveness and efficiency of a quality risk management program, moving beyond "check-the-box" compliance with guidelines such as ICH Q9 Quality Risk Management , to explore the value QRM brings to business and quality operations. While significant progress has been made towards full adoption of QRM principles and practices across industry, the full benefits of QRM have not yet been fully realized. The results of the QRM Benchmarking Survey indicate that the pharmaceutical and biopharmaceutical industries are approximately halfway along the journey towards full QRM maturity. LAY ABSTRACT: The management of risks associated with medicinal product quality and patient safety are an important focus for the pharmaceutical and biopharmaceutical industries. These risks are identified, analyzed, and controlled through a defined process called quality risk management (QRM), which seeks to protect the patient from potential quality-related risks. This paper summarizes the outcomes of a comprehensive survey of industry practitioners performed in 2015 and 2016 that aimed to benchmark the level of maturity with regard to the application of QRM. The survey results and subsequent analysis revealed that the pharmaceutical and biopharmaceutical industries have made significant progress in the management of quality risks over the last ten years, and they are roughly halfway towards reaching full maturity of QRM. © PDA, Inc. 2017.

  7. Review of the Literature on the Changing Psychological Contract: Implications on Career Management and Organizations

    Science.gov (United States)

    Lessner, Ryan; Akdere, Mesut

    2008-01-01

    The changing psychological contract has become a focus for organizational development, especially as job roles within organizations continue to change. This literature review examines the evolving employee-employer relationship and how this relationship has impacted career management and organizations for over the past century. The paper…

  8. Public health laboratory quality management in a developing country.

    Science.gov (United States)

    Wangkahat, Khwanjai; Nookhai, Somboon; Pobkeeree, Vallerut

    2012-01-01

    The article aims to give an overview of the system of public health laboratory quality management in Thailand and to produce a strengths, weaknesses, opportunities and threats (SWOT) analysis that is relevant to public health laboratories in the country. The systems for managing laboratory quality that are currently employed were described in the first component. The second component was a SWOT analysis, which used the opinions of laboratory professionals to identify any areas that could be improved to meet quality management systems. Various quality management systems were identified and the number of laboratories that met both international and national quality management requirements was different. The SWOT analysis found the opportunities and strengths factors offered the best chance to improve laboratory quality management in the country. The results are based on observations and brainstorming with medical laboratory professionals who can assist laboratories in accomplishing quality management. The factors derived from the analysis can help improve laboratory quality management in the country. This paper provides viewpoints and evidence-based approaches for the development of best possible practice of services in public health laboratories.

  9. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  10. From technical quality assurance of radiotherapy to a comprehensive quality of service management system

    International Nuclear Information System (INIS)

    Kehoe, T.; Rugg, L.

    1999-01-01

    A hierarchy of dosimetry, planning and machine performance checks and evaluations of clinical outcomes have been widely used in radiotherapy for decades. Procedures, codes of practice and guidance are readily available on the technical aspects of radiotherapy treatments, maintenance of which is achieved by quality control checks within a quality assurance approach to radiotherapy. Recently a series of high profile, well-publicised treatment accidents resulting in damage to patients have focused the attention of both professionals and the public. There is now pressure to introduce formal quality management systems. Patients and their relatives/carers are having their expectations raised but their definition of a quality service differs from that generally considered by the oncology professionals. Most departmental managers and staff have wide experience of quality control checks. They understand the philosophy of quality assurance. However the idea of formal quality systems/quality management is alien to them. What is a professional/departmental manager to do? This paper addresses that question by discussing the underlying principles of quality management covering service provision as well as technical radiotherapy treatment delivery and by providing some guidance based on experience in the practical implementation of quality management through three stages of development: a QA programme incorporating checks on essential parts of the technical treatment delivery, a formal documented certified QA system focusing on technical treatment delivery, a comprehensive quality management system covering all parts of a service. One possible action plan is provided indicating progress through the three stages of development based on experience in one large Radiation Oncology Department. With planning, resources and commitment. a comprehensive quality of service management system is achievable in radiotherapy. (author.)

  11. 14 CFR 60.5 - Quality management system.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Quality management system. 60.5 Section 60... requirement of this chapter unless the sponsor has established and follows a quality management system (QMS...) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.5 Quality...

  12. Quality management for WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Feist, J.-H.; Bramow, H.-J.; Braeuer, T.; Gliege, G.; Kamionka, U.; Krause, B.; Pieger-Frey, M.; Wanner, M.

    2001-01-01

    The WENDELSTEIN 7-X stellarator is the next step device in the stellarator line of IPP Garching and is being built in the new branch institute of IPP at Greifswald. Start of operation is scheduled for 2006. The W7-X project is presently the largest scientific project in Germany with a total spending of 300 MEU during the construction phase. From the beginning of the design up to the end of operation, the project will last for almost 40 years. More than 350 people are expected to work on W7-X during the operational phase. An experiment of this size needs an industrial type management. An essential central function within this management is performed by the quality management division. This division is responsible for the following subtasks: system co-ordination, documentation, quality planning and quality assurance. A quality system is established for the W7-X construction project which is based on the DIN EN ISO 9000 family. The basis of the quality system is a quality manual together with the necessary procedures and instructions. Quality planning and assurance is carried out in close co-operation with the various technical divisions

  13. Incentive contracts and time use

    OpenAIRE

    Tor Viking Eriksson; Jaime Ortega

    2011-01-01

    Empirical studies on incentive contracts have primarily been concerned with the effects on employees’ productivity and earnings. The productivity increases associated with such contracts may, however, come at the expense of quality of life at or outside work. In this paper we study the effect on the employees’ non-work activities, testing whether incentive contracts lead to a change in the allocation of time across work and non-work activities. In doing so, we distinguish between two effects,...

  14. AMCP Partnership Forum: Advancing Value-Based Contracting.

    Science.gov (United States)

    2017-11-01

    During the past decade, payment models for the delivery of health care have undergone a dramatic shift from focusing on volume to focusing on value. This shift began with the Affordable Care Act and was reinforced by the Medicare Access and CHIP Reauthorization Act of 2015 (MACRA), which increased the emphasis on payment for delivery of quality care. Today, value-based care is a primary strategy for improving patient care while managing costs. This shift in payment models is expanding beyond the delivery of health care services to encompass models of compensation between payers and biopharmaceutical manufacturers. Value-based contracts (VBCs) have emerged as a mechanism that payers may use to better align their contracting structures with broader changes in the health care system. While pharmaceuticals represent a small share of total health care spending, it is one of the fastest-growing segments of the health care marketplace, and the increasing costs of pharmaceuticals necessitate more flexibility to contract in new ways based on the value of these products. Although not all products or services are appropriate for these types of contracts, VBCs could be a part of the solution to address increasing drug prices and overall drug spending. VBCs encompass a variety of different contracting strategies for biopharmaceutical products that do not base payment rates on volume. These contracts instead may include payment on the achievement of specific goals in a predetermined patient population and offer innovative solutions for quantifying and rewarding positive outcomes or otherwise reducing payer risk associated with pharmaceutical costs. To engage national stakeholders in a discussion of current practices, barriers, and potential benefits of VBCs, the Academy of Managed Care Pharmacy (AMCP) convened a Partnership Forum on Advancing Value-Based Contracting in Arlington, Virginia, on June 20-21, 2017. The goals of the VBC forum were as follows: (a) agree to a definition

  15. The development of quality assurance and quality management in civil engineering

    International Nuclear Information System (INIS)

    Haste, N.D.

    1991-01-01

    The paper describes the development of Quality Assurance and Quality Management during construction at the Sizewell-B power plant from the lead provided in the Client's documentation. The hard lessons learnt from dealing with major suppliers and sub-contractors are explained. The paper concludes by describing the ways in which total Quality Management is now addressed within Laings Civil Engineering following the experiences at Sizewell and elsewhere. (author)

  16. DUQuE quality management measures: associations between quality management at hospital and pathway levels

    NARCIS (Netherlands)

    Wagner, C.; Groene, O.; Thompson, C.A.; DerSarkissian, M.; Klazinga, N.S.; Arah, O.A.; Sunol, R.

    2014-01-01

    Objective. The assessment of integral quality management (QM) in a hospital requires measurement and monitoring from different perspectives and at various levels of care delivery. Within the DUQuE project (Deepening our Understanding of Quality improvement in Europe), seven measures for QM were

  17. DUQuE quality management measures: associations between quality management at hospital and pathway levels.

    NARCIS (Netherlands)

    Wagner, C.; Groene, O.; Thompson, C.A.; DerSarkissian, M.; Klazinga, N.S.; Arah, O.A.; Suñol, R.

    2014-01-01

    Objective: The assessment of integral quality management (QM) in a hospital requires measurement and monitoring from different perspectives and at various levels of care delivery. Within the DUQuE project (Deepening our Understanding of Quality improvement in Europe), seven measures for QM were

  18. Improving Software Quality and Management Through Use of Service Level Agreements

    National Research Council Canada - National Science Library

    Gaines, Leonard T

    2005-01-01

    .... SLAs are typically used in outsourcing contracts for post-production support. We propose that SLAs be used in software acquisition to support quality and process control throughout the lifecycle...

  19. Total Quality Management as a Paradigm of Business Success

    Directory of Open Access Journals (Sweden)

    Luburić Radoica

    2014-01-01

    Full Text Available Total Quality Management denotes a path by which - both in a stable and a transitional environment, in a professional and scientific way and by applying a variety of methods and techniques, through constant improvements and involvement of all employees - one could get to a model that enables a simultaneous achievement of the top quality level on one hand, and the top management level, on the other. Total Quality Management is a paradigm of business success in the entire world because its set up, inter alia, improves internal functions of an organisation, instils confidence in customers and triggers improvement chain reactions with suppliers and stakeholders. Quality is the foundation and client orientation is the base of the entire concept of total quality management. Placing customers at the centre is the main idea behind the entire quality concept around which everything is built. Improving the capacity of an organization to understand and meet the actual customer needs, both stated and implied, is the main objective of the total quality management. Teamwork and team leadership play a specific role in the total quality management, top managers have the key responsibilities, and activities of the medium and lower level managers together with all employees are of immeasurable significance. Managing the teamwork within the total quality management is not only a requirement for its set up, development and implementation, but also for its survival. Total Quality Management is a managerial philosophy and a mode of running a business in order to achieve success.

  20. Quantitative research versus quality assurance, quality improvement, total quality management, and continuous quality improvement.

    Science.gov (United States)

    Vogelsang, J

    1999-04-01

    The purpose of this report is to provide a review of the scientific method used in the quantitative research studies for consumers, evaluators, and applied nurse researchers. The fundamental characteristics of the problem-solving/ performance-improvement processes of quality assurance, quality improvement, total quality management, and continuous quality improvement are described. Research is compared with these processes, and is followed by a discussion about the publication of quantitative research findings.

  1. Short Term Hedging Using Futures Contracts

    Directory of Open Access Journals (Sweden)

    Ioana – Diana PAUN

    2012-12-01

    Full Text Available The objective of this paper is to demonstrate the effectiveness of risk management portfolio using futures contracts to achieve hedging. The risk can be minimized once measured, and the traditional tool of market risk management is hedging. The objective is to identify the optimum position to minimize the variation in a contract concluded now. Clearly hedging portfolio will reduce not only risk but also profitability. In conclusion hedging aims risk management, no additional gain. Portfolio manager will have the opportunity to carefully consider the relationship between risk and return in order to act according to his profile and targeted results.

  2. Intelligent decision making in quality management theory and applications

    CERN Document Server

    Yanık, Seda

    2016-01-01

      This book presents recently developed intelligent techniques with applications and theory in the area of quality management. The involved applications of intelligence include techniques such as fuzzy sets, neural networks, genetic algorithms, etc. The book consists of classical quality management topics dealing with intelligent techniques for solving the complex quality management problems. The book will serve as an excellent reference for quality managers, researchers, lecturers and postgraduate students in this area. The authors of the chapters are well-known researchers in the area of quality management.  .

  3. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  4. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  5. Performance contracting in central government in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2015-01-01

    ) are observed across central government agencies, when the content of the performance contracts is compared. This makes it interesting to examine how variation in the content of the performance contracts across agencies can be explained? Based on a broad theoretical framework in which variation......This paper looks into performance contracting in Danish central government. Management by Objectives and Results (MBOR) was adopted in central government in Denmark during the 1980s and early 1990s. In 1991, performance contracts between parent ministries and their agencies were introduced...... in Danish central government. Since their introduction, performance contracts have become central elements in the steering and management of agencies in central government in Denmark, and today they are nearly universally adopted in central government. In Denmark, the Ministry of Finance is responsible...

  6. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  7. Contractibility of financial statement information prepared under IFRS: Evidence from debt contracts around IFRS adoption

    OpenAIRE

    Shivakumar, L; Ball, R; Li, X

    2015-01-01

    We outline several properties of IFRS that potentially affect the contractibility or the transparency of financial statement information, and hence the use of that information in debt contracts. Those properties include the increased choice among accounting rules IFRS gives to managers, enhanced rule-making uncertainty, and increased emphasis on fair value accounting. Consistent with reduced contractibility of IFRS financial statement information, we find a significant reduction in accounting...

  8. PROPOSAL OF THE SOCIAL CONTRACT IN MANAGEMENT AS INSTRUMENT OF ANALYSIS FOR THE EMPLOYMENT RELATION. THE EXPERIENCE OF AUTOMOTIVE INDUSTRY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Muresanu Doina

    2012-07-01

    through the systematic and global vision of the values and standards relating to the employment relation, that we can better comprehend the consequences of a change of the employment relation. Given its exploratory character, we use an inductive, thus qualitative, methodology, to perform this research. The partial results of the analysis of the interviews led in two Romanian companies during the summer of 2010 allowed us to identify several components, which we called "terms" of the social contract. These results will deliver to the practitioners and to the researchers in management a relevant tool to better understand the relation of employment in different national cultures as well as a measuring instrument for the quality of the employee-employer relation. Our communication ends by proposing various paths of reflection which will allow to use this approach in future researches concerning the employment relation.

  9. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  10. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J.van den; Taris, T.W.

    2012-01-01

    Objectives: Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable

  11. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  12. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  13. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  14. Analysis of international oil and gas contracts

    International Nuclear Information System (INIS)

    Moran, S.

    1992-01-01

    The purposes of this paper are to describe the main types of international petroleum contracts, to give the reader methods for comparing contract qualities and analyzing the profitability of petroleum field models under basic contract terms, to describe methods for assessing tradeoffs between various terms of a contract, to describe briefly U.S. Taxation of international petroleum extraction income, and to discuss certain special considerations that apply to the international arena

  15. Measuring effectiveness of food quality management

    NARCIS (Netherlands)

    Spiegel, van der M.

    2004-01-01

    Keywords: effectiveness, food quality management, instrument, quality performance, contextual factors, agri-food production, conceptual model, performance measurement indicators, identification, validation, assessment, quality assurance systems, QA systems, HACCP, Hygiene code, ISO, BRC, GMP, bakery

  16. DUQuE quality management measures: associations between quality management at hospital and pathway levels

    NARCIS (Netherlands)

    Wagner, Cordula; Groene, Oliver; Thompson, Caroline A.; Dersarkissian, Maral; Klazinga, Niek S.; Arah, Onyebuchi A.; Suñol, Rosa; Kringos, D. S.; Lombarts, K.; Plochg, T.; Lopez, M. A.; Secanell, M.; Sunol, R.; Vallejo, P.; Bartels, P.; Kristensen, S.; Michel, P.; Saillour-Glenisson, F.; Vlcek, F.; Car, M.; Jones, S.; Klaus, E.; Garel, P.; Hanslik, K.; Saluvan, M.; Bruneau, C.; Depaigne-Loth, A.; Shaw, C.; Hammer, A.; Ommen, O.; Pfaff, H.; Groene, O.; Botje, D.; Wagner, C.; Kutaj-Wasikowska, H.; Kutryba, B.; Escoval, A.; Franca, M.; Almeman, F.; Kus, H.; Ozturk, K.; Mannion, R.; Chow, A.; Dersarkissian, M.; Thompson, C.; Wang, A.; Thompson, A.

    2014-01-01

    The assessment of integral quality management (QM) in a hospital requires measurement and monitoring from different perspectives and at various levels of care delivery. Within the DUQuE project (Deepening our Understanding of Quality improvement in Europe), seven measures for QM were developed. This

  17. Contract law for physicians. The basics.

    Science.gov (United States)

    Eelkema, R

    1989-02-01

    As part of the Minnesota Medical Association's ongoing contract review process, this article provides information to help educate physicians about the major managed care contracts being offered to them. The information provided is not intended to, nor should it be a substitute for legal advice pertaining to an individual's practice and specific contracts with third parties. The MMA will not be making recommendations regarding the merits of any particular contract. A decision to enter into a contract rests with the physician and his or her clinic in consultation with private legal counsel.

  18. Covenant Violations and Dynamic Loan Contracting

    DEFF Research Database (Denmark)

    Freudenberg, Felix; Imbierowicz, Björn; Saunders, Anthony

    2017-01-01

    This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject...... potentially other explanations such as firm characteristics or agency problems between the lender and firm management, shareholders or public debtholders. After covenant violations in the prior contract, new loans have on average 18 bps higher spreads and include more of those covenant types which also have...

  19. Verification of a quality management theory: using a delphi study.

    Science.gov (United States)

    Mosadeghrad, Ali Mohammad

    2013-11-01

    A model of quality management called Strategic Collaborative Quality Management (SCQM) model was developed based on the quality management literature review, the findings of a survey on quality management assessment in healthcare organisations, semi-structured interviews with healthcare stakeholders, and a Delphi study on healthcare quality management experts. The purpose of this study was to verify the SCQM model. The proposed model was further developed using feedback from thirty quality management experts using a Delphi method. Further, a guidebook for its implementation was prepared including a road map and performance measurement. The research led to the development of a context-specific model of quality management for healthcare organisations and a series of guidelines for its implementation. A proper model of quality management should be developed and implemented properly in healthcare organisations to achieve business excellence.

  20. The inherent politics of quality in public park management

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Konijnendijk, Cecil Cornelis; Fors, Hanna

    2012-01-01

    In this paper, we highlight and illustrate the inherent politics embedded in “quality” as a concept for managing public parks. Reflecting more generic quality concepts, contemporary quality models in park management include concepts for both operational, strategic and stakeholder management as well...... managing the park organisation itself. However, quality concepts and their application through various management models include as well as exclude the access, values and worldviews of particular interests. In this way, any particular quality concept and model embeds its own politics by inherent...... allocations of ‘who gets what, when and how’. We illustrate the inherent politics by providing a case study of a widely adopted quality model for operational management that has been adopted and implemented in Denmark as part of new public management reforms. In perspective, other quality concepts and models...

  1. Organizational learning in developing the integrated quality management

    Directory of Open Access Journals (Sweden)

    Juhani Anttila

    2018-04-01

    Full Text Available High quality is organizations’ competitive advantage. It is beneficial to base this on professional approach, and basic concepts and definitions with scientific foundation. The necessary main concepts consist of quality, quality management, quality improvement and quality assurance. Organizations' top management is responsible of the quality management decisions and implementations. The present practical situation is fragmented and the implementations are most often based on the instrumental means of the different methodological schools, which is confusing and detrimental to the understanding and usefulness of the concept of quality management. It is not beneficial to build a special system for quality management by only following the requirements of the general standard. This cannot ensure competitive business advantage. In this article, we present an alternative approach that is a natural practical way to realize quality management as the teleological solution, Quality Integration, in which the general and specific quality concepts, principles and methodology are embedded within the normal business management activities. Our Quality Integration is based on the thinking of organizational learning. Its framework covers both running the current business and improving the overall business performance. This model has been used as the thinking framework in practical organizational cases since 1990’s. As the business circumstances change constantly, the organization must be constantly ready to renew through both small and radical changes. This change also receives resistance, and the development takes place according to a multi-phase process towards the new integration and requires a proper recognition and decisions. Principles of the organizational learning can help organizations in a consistent way. Evaluation of the overall organizational performance is an important quality management practice and should take into account performance enablers

  2. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  3. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  4. [Essential guidelines for Quality Management System].

    Science.gov (United States)

    Daunizeau, A

    2013-06-01

    The guidelines describe the essential parts of the quality management system to fulfil the requirements of the standard EN ISO 15 189. It includes mainly the organisation, the definition of responsibilities, training of personnel, the document control, the quality control, identification and control of nonconformities, corrective actions, preventive actions and evaluation, as audits and the management review.

  5. 48 CFR 1536.201 - Evaluation of contracting performance.

    Science.gov (United States)

    2010-10-01

    ... performance. 1536.201 Section 1536.201 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY... Contracting for Construction 1536.201 Evaluation of contracting performance. (a) The Contracting Officer will... will file the form in the contractor performance evaluation files which it maintains. (e) The Quality...

  6. Holistic Contract Administration in Army Forces Abroad

    Science.gov (United States)

    2016-10-01

    other began. Expanding the Scope of Quality Assurance Personnel charged with administering service contracts tend to heavily emphasize ensuring... audits deterred unethical contractor labor practices while providing contractor employees assur - ances of fair treatment. A well-written QASP will...Contracting Team at Camp As Sayliyah in Qatar. Gatewood, a U.S. Government civilian employee, was the lead quality assurance specialist for the 742nd

  7. 48 CFR 970.0407-1-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0407... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407-1-3 Contract clause. The contracting officer shall insert the clause at 970.5204-3, Access to and Ownership of Records...

  8. Total quality management analysis in printing industry | Ching ...

    African Journals Online (AJOL)

    Total quality management analysis in printing industry. ... Journal of Fundamental and Applied Sciences ... The organization is suggested to implement Total Quality Management (TQM) in order to improve the quality of the products and hence ...

  9. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Karen; Vasquez, Deb

    2017-01-01

    The Federal Energy Management Program's 'Utility Energy Service Contracts: Enabling Documents' provide legislative information and materials that clarify the authority for federal agencies to enter into utility energy service contracts, or UESCs.

  10. Contracting as a Science

    Science.gov (United States)

    2012-04-30

    disconfirmation of expectations theory to examine customer satisfaction in the procuring contracting officer (PCO)–program manager (PM) relationship in...marketing terms, finding that disconfirmed expectations lead to consumer satisfaction or dissatisfaction. The former approach presents the idea that if an...individual exerts effort, the expectation is that successful performance will occur leading to a desired result. In contracting, the theory might be

  11. Strategic collaborative quality management and employee job satisfaction.

    Science.gov (United States)

    Mosadeghrad, Ali Mohammad

    2014-05-01

    This study aimed to examine Strategic Collaborative Quality Management (SCQM) impact on employee job satisfaction. The study presents a case study over six years following the implementation of the SCQM programme in a public hospital. A validated questionnaire was used to measure employees' job satisfaction. The impact of the intervention was measured by comparing the pre-intervention and post-intervention measures in the hospital. The hospital reported a significant improvement in some dimensions of job satisfaction like management and supervision, organisational policies, task requirement, and working conditions. This paper provides detailed information on how a quality management model implementation affects employees. A well developed, well introduced and institutionalised quality management model can improve employees' job satisfaction. However, the success of quality management needs top management commitment and stability.

  12. Strategic Collaborative Quality Management and Employee Job Satisfaction

    Directory of Open Access Journals (Sweden)

    Ali Mohammad Mosadeghrad

    2014-05-01

    Full Text Available Background This study aimed to examine Strategic Collaborative Quality Management (SCQM impact on employee job satisfaction. Methods The study presents a case study over six years following the implementation of the SCQM programme in a public hospital. A validated questionnaire was used to measure employees’ job satisfaction. The impact of the intervention was measured by comparing the pre-intervention and post-intervention measures in the hospital. Results The hospital reported a significant improvement in some dimensions of job satisfaction like management and supervision, organisational policies, task requirement, and working conditions. Conclusion This paper provides detailed information on how a quality management model implementation affects employees. A well developed, well introduced and institutionalised quality management model can improve employees’ job satisfaction. However, the success of quality management needs top management commitment and stability.

  13. Verification of a Quality Management Theory: Using a Delphi Study

    Directory of Open Access Journals (Sweden)

    Ali Mohammad Mosadeghrad

    2013-11-01

    Full Text Available BackgroundA model of quality management called Strategic Collaborative Quality Management (SCQM model was developed based on the quality management literature review, the findings of a survey on quality management assessment in healthcare organisations, semi-structured interviews with healthcare stakeholders, and a Delphi study on healthcare quality management experts. The purpose of this study was to verify the SCQM model. MethodsThe proposed model was further developed using feedback from thirty quality management experts using a Delphi method. Further, a guidebook for its implementation was prepared including a road map and performance measurement. ResultsThe research led to the development of a context-specific model of quality management for healthcare organisations and a series of guidelines for its implementation. ConclusionA proper model of quality management should be developed and implemented properly in healthcare organisations to achieve business excellence.

  14. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  15. Helping air quality managers identify vulnerable communities

    CSIR Research Space (South Africa)

    Wright, C

    2008-10-01

    Full Text Available population exposure and vulnerability risk prioritisation model is proposed for potential use by air quality managers in conjunction with their air quality management plans. The model includes factors such as vulnerability caused by poverty, respiratory...

  16. QUALITY MANAGEMENT IN BANKING SYSTEM

    Directory of Open Access Journals (Sweden)

    Micuda Ion Dan

    2009-05-01

    Full Text Available Quality management banking perspective is extremely interesting, from the point of view of the activities specific, and of the permanent area competition improvement. Banks being aware of the quality problems also lead to the appearance and requirement of

  17. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  18. Performance-based contracts for road projects comparative analysis of different types

    CERN Document Server

    Gajurel, Ashish

    2014-01-01

    This book focuses on the aspects of contracting contracts, basically related to road construction and management contracts. The book presents an analytical study of Performance-Based Road Management and Maintenance (PMMR), Funktionsbauvertrag (FBV) (Function-Based Construction Contract) and Public Private Partnerships (PPP). A separate chapter is also included about the comparative study of these contract types. The book provides useful material for university libraries, construction companies and government departments of construction.

  19. HOTEL MANAGEMENT AND QUALITY OF HOTEL SERVICES

    Directory of Open Access Journals (Sweden)

    Ivica Batinić

    2016-01-01

    Full Text Available In conditions of increasing global competition, demands and needs of consumers, quality and quality management have become fundamental strategic factors of achieving profitability and competitiveness on the relentless tourism market. Any serious "top" hotel management, with a defined mission, vision and goals, must define a "special policy" of improving the quality of hotel services through "structural programs of quality improvement," which have become an important factor in the hotel business. With the design, introduction and control of a "special program" of quality improvement of hotel services, hotel management can have a positive impact on increasing satisfaction of customers and human resources, increasing competitiveness and market power of the hotel, the rationalization of operating costs and enhance the reputation and value of the hotel on the demanding tourist market.

  20. Report: Policies Needed for Proper Use and Management of Cost-Reimbursement Contracts Based on Duncan Hunter Act

    Science.gov (United States)

    Report #12-P-0320, March 6, 2012. EPA did not comply with several key revisions to the FAR as amended by the interim rule, Proper Use and Management of Cost Reimbursement Contracts (FAR Case 2008-030).

  1. The process approach to service quality management

    OpenAIRE

    Kamila Kowalik; Dorota Klimecka-Tatar

    2018-01-01

    In this paper a model of service quality management based on the process approach has been presented. The first part of the article contains the theoretical framework of service quality and the process approach in management. Next, quality of service process has been presented in reference to a process-based definition in quoted literature. Finally, the outcomes of a customer questionnaire concerning the validity of particular quality attributes has been presented. The collected data in relat...

  2. Information Support of the Higher Education Quality Management System

    Directory of Open Access Journals (Sweden)

    Murat K. Baymuldin

    2013-01-01

    Full Text Available The article deals with the quality management system (QMS of a university as a combination of organizational structure, procedures, processes and resources needed to implement quality policy with the help of quality planning, management, control and improvement, the need for automated information system of the university quality management system control

  3. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  4. Management Practice of Supply Chain Quality Management in Service-oriented Manufacturing Industry

    Directory of Open Access Journals (Sweden)

    Gu Ping

    2017-01-01

    Full Text Available Supply chain quality management (SCQM in service-oriented manufacturing industries is needed in delivering value to customers in all process of supply chain management based on total quality management (TQM. In the paper, we identify the latest themes through reviewing prior quality management and supply chain management(SCM literature. In particular, we find manufacturing firms transform from providing products towards providing services, which means they need to go through fundamental changes especially in supply chains. We use a case study of Heilan Home to illustrate the SCQM themes and their ways in industrial practice. Based on our research, the case study, the experience of working with this firm, we propose a SCQM performance evaluation framework, as well as four strategies for other industries to improve customer satisfaction and added value. In this way can promote the transformation and upgrading of the manufacturing industry in the perspective of quality.

  5. Records Management in Organization and Total Quality

    Directory of Open Access Journals (Sweden)

    Fahrettin Özdemirci

    1999-06-01

    Full Text Available In this article the relationship between total quality management and records managemen t are examined. It has also been indicated that the records mana­gement has vita'ly important part for realizing the total quality management approach.

  6. Quality in Qualitative Management Accounting Research

    DEFF Research Database (Denmark)

    Nørreklit, Hanne

    2014-01-01

    , the paper has implications for contemporary discussions on doing research that is relevant for practice. Originality/value: The paper provides novel insight into the analysis of quality in management accounting research. Additionally, it provides a framework for reflecting on the accumulation of practice......Purpose: The purpose of this article is to demonstrate how the quality of Qualitative Research in Accounting & Management (QRAM) is manifested through the conceptualization of knowledge about functioning actions that are applicable for local management accounting practices. Design...... to the development of a performativity in management accounting topos that integrates facts, possibilities, value and communication. Findings: The analysis documents that the three QRAM articles on inter-organizational cost management make a common contribution to the knowledge related to what to do to make...

  7. South Coast Air Quality Management District Truck Testing | Transportation

    Science.gov (United States)

    Research | NREL South Coast Air Quality Management District Truck Evaluation South Coast Air Quality Management District Truck Evaluation Photo of heavy-duty truck cab. Electric drayage truck Cargo Transportation project, conducted in partnership with the South Coast Air Quality Management

  8. 48 CFR 46.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... QUALITY ASSURANCE Warranties 46.710 Contract clauses. The clauses and alternates prescribed in this... research and development contract is contemplated and the use of a warranty clause has been approved under... performance specifications or design are of major importance; a fixed-price supply, service, or research and...

  9. Air quality management: challenges and solutions in delivering air quality action plans

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, C.I.; Longhurst, J.W.S.; Woodfield, N.K.

    2000-07-01

    The Air Quality Strategy for England, Scotland, Wales and Northern Ireland (DETR, 2001) has the aim of showing how improved local air quality in the UK may be delivered. Through a process of reviewing and assessing local air quality in both urban and rural localities, a clear picture is emerging of areas of the UK where air quality objectives are not likely to be met. The next challenge will be the identification of the required actions and new ways of working to achieve specific air quality objectives. The declaration of air quality management areas, where objectives are not predicted to be met by their target years, involves co-ordinated local action and collaborative working, which can only be effective with support across local authority departments and external stake holders. This paper provides a background to the relevant legislation underpinning, local air quality management and summarises the review and assessment process. It then comments on future directions in relation to the designation of Air Quality Management Areas and considers the requirements of action plans to deliver the goal of cleaner air in the UK. It is concluded that the UK has developed a highly sophisticated system of air quality management over a relatively short period of time, and with it has brought a new way of local authority working. The challenge of the next stage of the process is likely to be in implementing cost effective and proportional solutions to identified problems at the local level. (Author)

  10. EFFICIENCY AND QUALITY OF UNIVERSITY'S PERFORMANCE: FACULTY OPINION

    Directory of Open Access Journals (Sweden)

    Sergey Trapitsin

    2015-10-01

    Full Text Available The article dwells upon the issue of the quality and efficiency of higher education and presents the results of the survey which determines the readiness degree of the University teachers and management to the effective contract introduction. The contractual relationship is to be discussion based and similar to the social contract which is possible only if the upper and lower parts of the University structure will combine their efforts and effectively cooperate. The synthetic and multi-faceted socio-economic character of efficiency makes the development of practice-oriented tools for performance management of the University a burning issue.

  11. Has Outsourcing/Contracting Out Saved Money and/or Improved Service Quality? A Vote-Counting Analysis

    OpenAIRE

    Bourbeau, John Allen

    2004-01-01

    Most privatization literature, of which outsourcing/contracting out is a sub-set, discusses: 1) localized anecdotes of how organizations privatized; 2) privatization's history; 3) its types; and/or 4) its pros and cons. What is missing is a methodologically defensible, comprehensive, macro-view of whether or not outsourcing has saved money and/or improved service quality. Using the vote-counting analytical procedure, this dissertation provides one comprehensive view by analyzing and combin...

  12. Quality management in nuclear power plant technology

    International Nuclear Information System (INIS)

    Brosche, D.; Ehrnsperger, K.

    2001-01-01

    Quality assurance and therefore quality management are essential preconditions for the safety and availability of nuclear power plants. On the basis of the rules of the Kerntechnischer Ausschuss KTA 1401 the quality management in the former Bayernwerk AG and the Bayernwerk Kernenergie GmbH as well as in the Arbeitsgemeinschaft Auftragnehmerbeurteilung within the VGB Technical Association of Large Power Plant Operators is described. (orig.) [de

  13. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  14. Quality management system in Nuclear Medicine

    International Nuclear Information System (INIS)

    Peña Tornet, Adela; Torres Aroche, Leonel A.

    2016-01-01

    Establishing Management Systems (QMS) in services Nuclear Medicine (NM) is a prerequisite for optimizing the efficacy and safety of diagnostic and therapeutic procedures of this specialty and increase steadily the quality of the services provide patients. Several international organizations such as the IAEA and scientific specialty societies (SNM, EBNM, etc) and national bodies stimulate and enhance their introduction; in our country is also a requirement of the National Nuclear Safety Centre (CNSN). Are presented in this paper, the main experiences of our country related to the implementation of QMS and developed tools for achieving this goal, such as: The QNUMED automated web environment for managing indicators and documentation format digital; b) The development of prototypes and models for the implementation of the documentation system; d) requirements applying QUANUM in conducting audits of quality management in local services including QUANUM T ool tool; and f) human resource development issues in Quality Management. (author)

  15. TVA nuclear power: Management of the nuclear program through personal services contracts

    International Nuclear Information System (INIS)

    1987-01-01

    Mr. Steven White, a retired admiral, is serving as manager of the TVA Office of Nuclear Power. GAO previously concluded that Mr. White's retention under contractual arrangements constituted the improper use of a personal services contract and represented a circumvention of the statutory ceiling on salary payments to TVA employees. This report finds that Mr. White's rate of pay is within the range of the salaries paid by a sample of nonfederal utilities to their top executives and is over two and a half times the average salary paid to executives who hold positions which appear to have responsibility for managing the utilities' power or nuclear power operations. GAO also found that (1) TVA's Office of Nuclear Power has employed an additional 25 persons since 1986 under arrangements similar to the employing arrangements of Mr. White and (2) TVA's Nuclear Safety Review staff no longer reports directly to the TVA Board of Directors and General Manager. It has relocated from Knoxville, Tennessee to Chattanooga, Tennessee

  16. Contracting private sector providers for public sector health services in Jalisco, Mexico: perspectives of system actors

    Directory of Open Access Journals (Sweden)

    González Luz

    2009-10-01

    Full Text Available Abstract Introduction Contracting out health services is a strategy that many health systems in the developing world are following, despite the lack of decisive evidence that this is the best way to improve quality, increase efficiency and expand coverage. A large body of literature has appeared in recent years focusing on the results of several contracting strategies, but very few papers have addressed aspects of the managerial process and how this can affect results. Case description This paper describes and analyses the perceptions and opinions of managers and workers about the benefits and challenges of the contracting model that has been in place for almost 10 years in the State of Jalisco, Mexico. Both qualitative and quantitative information was collected. An open-ended questionnaire was used to obtain information from a group of managers, while information provided by a self-selected group of workers was collected via a closed-ended questionnaire. The analysis contrasted the information obtained from each source. Discussion and Evaluation Findings show that perceptions of managers and workers vary for most of the items studied. For managers the model has been a success, as it has allowed for expansion of coverage based on a cost-effective strategy, while for workers the model also possesses positive elements but fails to provide fair labour relationships, which negatively affects their performance. Conclusion Perspectives of the two main groups of actors in Jalisco's contracting model are important in the design and adjustment of an adequate contracting model that includes managerial elements to give incentives to worker performance, a key element necessary to achieve the model's ultimate objectives. Lessons learnt from this study could be relevant for the experience of contracting models in other developing countries.

  17. THE RELATIONSHIP BETWEEN MODELS OF QUALITY MANAGEMENT AND CSR

    Directory of Open Access Journals (Sweden)

    CĂTĂLINA SITNIKOV

    2015-03-01

    Full Text Available Lately, the quality management has integrated more and more among its components Corporate Social Responsibility (CSR. With strong roots in the foundation for sustainable development, protection of the environment, issues of social justness and economic growth, CSR raises numerous issues related to obtaining profits, business performance and firms and activities based on the quality of management. From the point of view of the last issues, the models of quality management built on the fundamental principles of quality become the foundation and catalyst for the effective implementation of CSR in organizations. This is the reason why it is necessary to investigate the extent to which quality management models provide frameworks and guidelines for integrating CSR in the management of quality and, moreover, in the management of the organization, with a clear focus on the extent to which the concept can be institutionalized and operated by the organization.

  18. Comparison of approaches to Total Quality Management. Including an examination of the Department of Energy`s position on quality management

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, C.T.

    1994-03-01

    This paper presents a comparison of several qualitatively different approaches to Total Quality Management (TQM). The continuum ranges from management approaches that are primarily standards -- with specific guidelines, but few theoretical concepts -- to approaches that are primarily philosophical, with few specific guidelines. The approaches to TQM discussed in this paper include the International Organization for Standardization (ISO) 9000 Standard, the Malcolm Baldrige National Quality Award, Senge`s the Learning Organization, Watkins and Marsick`s approach to organizational learning, Covey`s Seven Habits of Highly Successful People, and Deming`s Fourteen Points for Management. Some of these approaches (Deming and ISO 9000) are then compared to the DOE`s official position on quality management and conduct of operations (DOE Orders 5700.6C and 5480.19). Using a tabular format, it is shown that while 5700.6C (Quality Assurance) maps well to many of the current approaches to TQM, DOE`s principle guide to management Order 5419.80 (Conduct of Operations) has many significant conflicts with some of the modern approaches to continuous quality improvement.

  19. Integrating Total Quality Management (TQM) and hazardous waste management

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Nancy [Colorado State Univ., Fort Collins, CO (United States)

    1993-11-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ``cradle to grave`` management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ``front-end`` treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ``mixed waste`` at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components.

  20. Integrating Total Quality Management (TQM) and hazardous waste management

    International Nuclear Information System (INIS)

    Kirk, N.

    1993-01-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ''cradle to grave'' management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ''front-end'' treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ''mixed waste'' at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components

  1. Quality assurance: Importance of systems and standard operating procedures.

    Science.gov (United States)

    Manghani, Kishu

    2011-01-01

    It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  2. Quality assurance: Importance of systems and standard operating procedures

    Directory of Open Access Journals (Sweden)

    Kishu Manghani

    2011-01-01

    Full Text Available It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  3. ADKAR MODEL VS. QUALITY MANAGEMENT CHANGE

    Directory of Open Access Journals (Sweden)

    Gratiela Dana Boca

    2013-12-01

    Full Text Available This research was conducted through different countries to identify dimensions and antecedents of buyer-seller relationships quality. In light of the findings dimensions of relationship quality have emerged: mutual trust, partners’ commitment in the relationship, cooperation and creativity and innovation. Also, the research identifies several key success factors in business relationships that are grouped into different categories: factors related to relational behaviours and factors related to characteristics of the offer. These results serve as valuable indicators, allowing managers to evaluate, adjust and develop their relationships marketing strategies. The ADKAR model provides a tool for improving the connection between individual performance, organizational change management and business results. This study provides a significant contribution to the relationship quality literature and present few ideas for future management in a new manufacture vision for MANU-FUTURE.

  4. Diabetes quality management in care groups and outpatient clinics

    NARCIS (Netherlands)

    Campmans-Kuijpers, M.J.E.

    2015-01-01

    This research project relates to diabetes quality management in Dutch care groups (40-200 GP practices) and outpatient clinics. Improvement of quality management at an organisational level on top of the existing quality management in separate general practices is expected to be associated with

  5. [ISO 9001:2015 Certification in Quality Management].

    Science.gov (United States)

    Enders, Christian; Lang, Gabriele E; Lang, Gerhard K; Werner, Jens Ulrich

    2017-07-01

    Quality management improves the structures, processes and results of organizations of all kinds. Many practices and clinics have their existing quality management system certified according to ISO 9001, (e.g., to check their own quality management system or to obtain a testimonial against third parties). The latest version ISO 9001:2015 contains some changes, both structurally and in terms of content. These changes can be met with reasonable efforts. An ISO 9001:2015 certification represents a value for your organization, but these advantages are often not directly measurable. Georg Thieme Verlag KG Stuttgart · New York.

  6. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  7. TOTAL QUALITY MANAGEMENT AND CONTEMPORARY HOTEL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Ivica Batinić

    2013-04-01

    Full Text Available Strong competition in the market has caused the development of a new management approach known as Total Quality Management (TQM. Due to importance that quality plays in achieving competitive advantage, the hotel industry started to apply TQM. During the introduction of these systems, hotel companies may use different approaches to suit their own buseiness requirements. In doing so, 'TQM standards' can be used, or various international standards and models of business excellence Malcolm Balridge National Quality Award and European Quality Award.

  8. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  9. EPA Region 3 Quality Management Plans

    Science.gov (United States)

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  10. [Quality assurance and quality management in intensive care].

    Science.gov (United States)

    Notz, K; Dubb, R; Kaltwasser, A; Hermes, C; Pfeffer, S

    2015-11-01

    Treatment success in hospitals, particularly in intensive care units, is directly tied to quality of structure, process, and outcomes. Technological and medical advancements lead to ever more complex treatment situations with highly specialized tasks in intensive care nursing. Quality criteria that can be used to describe and correctly measure those highly complex multiprofessional situations have only been recently developed and put into practice.In this article, it will be shown how quality in multiprofessional teams can be definded and assessed in daily clinical practice. Core aspects are the choice of a nursing theory, quality assurance measures, and quality management. One possible option of quality assurance is the use of standard operating procedures (SOPs). Quality can ultimately only be achieved if professional groups think beyond their boundaries, minimize errors, and establish and live out instructions and SOPs.

  11. 78 FR 72572 - Operational Contract Support

    Science.gov (United States)

    2013-12-03

    ... contract support (OCS), including OCS program management, contract support integration, and integration of... integration, and the integration of DoD contractor personnel into contingency operations outside the United... significant economic impact on a substantial number of small entities. Public Law 96-511, ``Paperwork...

  12. Contract-driven creation and operation of virtual enterprises

    NARCIS (Netherlands)

    Hoffner, Y.; Field, S.; Grefen, P.W.P.J.; Ludwig, H.

    2001-01-01

    This paper examines the support needed for dynamically creating and managing contract-driven virtual enterprises. Our approach to virtual enterprises views contracts as the central theme that runs throughout the enterprises' life cycle and touches upon all major aspects thereof. A Contract Framework

  13. Contract Driven Creation and Operation of Virtual Enterprises

    NARCIS (Netherlands)

    Hoffner, Yigal; Field, Simon; Grefen, P.W.P.J.; Ludwig, Heiko

    2001-01-01

    This paper examines the support needed for dynamically creating and managing contract-driven virtual enterprises. Our approach to virtual enterprises views contracts as the central theme that runs throughout the enterprises' life cycle and touches upon all major aspects thereof. A Contract Framework

  14. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  15. 50 CFR 81.12 - Contracts.

    Science.gov (United States)

    2010-10-01

    ... SPECIES OF FISH, WILDLIFE, AND PLANTS-COOPERATION WITH THE STATES § 81.12 Contracts. The State may use its... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Contracts. 81.12 Section 81.12 Wildlife... provided by Office of Management and Budget Circular A-102. The State is the responsible authority without...

  16. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  17. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  18. Measuring Effectiveness of Food Quality Management in the Bakery Sector

    NARCIS (Netherlands)

    Spiegel, van der M.; Luning, P.A.; Boer, de W.J.; Ziggers, G.W.; Jongen, W.M.F.

    2006-01-01

    Inappropriate management of food production operations cause several quality performance problems. Therefore, the actual contribution of food quality management to quality performance has to be revealed. This article investigates the effectiveness of food quality management in the bakery sector.

  19. [Clinical trial data management and quality metrics system].

    Science.gov (United States)

    Chen, Zhao-hua; Huang, Qin; Deng, Ya-zhong; Zhang, Yue; Xu, Yu; Yu, Hao; Liu, Zong-fan

    2015-11-01

    Data quality management system is essential to ensure accurate, complete, consistent, and reliable data collection in clinical research. This paper is devoted to various choices of data quality metrics. They are categorized by study status, e.g. study start up, conduct, and close-out. In each category, metrics for different purposes are listed according to ALCOA+ principles such us completeness, accuracy, timeliness, traceability, etc. Some general quality metrics frequently used are also introduced. This paper contains detail information as much as possible to each metric by providing definition, purpose, evaluation, referenced benchmark, and recommended targets in favor of real practice. It is important that sponsors and data management service providers establish a robust integrated clinical trial data quality management system to ensure sustainable high quality of clinical trial deliverables. It will also support enterprise level of data evaluation and bench marking the quality of data across projects, sponsors, data management service providers by using objective metrics from the real clinical trials. We hope this will be a significant input to accelerate the improvement of clinical trial data quality in the industry.

  20. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Science.gov (United States)

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  1. Significance of ISO 9000 Quality Management System for ...

    African Journals Online (AJOL)

    Significance of ISO 9000 Quality Management System for Performance ... of ISO 9000 Quality Management System implementation for performance improvement. ... to find out the relationship between certification and process variability.

  2. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  3. Project officer's perspective: quality assurance as a management tool.

    Science.gov (United States)

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  4. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    Science.gov (United States)

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1

  5. Urban Quality Development & Management

    DEFF Research Database (Denmark)

    Lehmann, Martin; Fryd, Ole

    2008-01-01

    Purpose: The purpose of this article is to describe and discuss the development and the structure of a new international master on the subject of Urban Quality Development & Management, and explore the potential of the process and the outcome in serving as models adoptable by faculty at other......: Urban quality development and management is dependent on human resource development, institutionalised networks and confident exchange of knowledge, and must identify and incorporate multiple environmental, social, economic and cultural aspects. The authors find that at the core of innovative societies......, an interlinkage exists between practice (business, civil society, governance) and theory (research, education). The case illustrates how a new curriculum takes time to develop and implement and how it relies on confidence and trust between partners, in this case cities and universities, before being able to plant...

  6. [Informatics data quality and management].

    Science.gov (United States)

    Feng, Rung-Chuang

    2009-06-01

    While the quality of data affects every aspect of business, it is frequently overlooked in terms of customer data integration, data warehousing, business intelligence and enterprise applications. Regardless of which data terms are used, a high level of data quality is a critical base condition essential to satisfy user needs and facilitate the development of effective applications. In this paper, the author introduces methods, a management framework and the major factors involved in data quality assessment. Author also integrates expert opinions to develop data quality assessment tools.

  7. Impact of culture on the application of quality management system

    OpenAIRE

    2012-01-01

    M.Ing. The management of quality in companies has become more and more strategically important over recent years. The emphasis on quality is vital to managing projects and achieving excellence in today’s global economy. Modern petrochemical construction project management has incorporated quality management principles and initiatives in their activities. The Quality Management System is used to ensure that the project will satisfy the requirements for which it was undertaken. Improving pro...

  8. Quality and reliability management and its applications

    CERN Document Server

    2016-01-01

    Integrating development processes, policies, and reliability predictions from the beginning of the product development lifecycle to ensure high levels of product performance and safety, this book helps companies overcome the challenges posed by increasingly complex systems in today’s competitive marketplace.   Examining both research on and practical aspects of product quality and reliability management with an emphasis on applications, the book features contributions written by active researchers and/or experienced practitioners in the field, so as to effectively bridge the gap between theory and practice and address new research challenges in reliability and quality management in practice.    Postgraduates, researchers and practitioners in the areas of reliability engineering and management, amongst others, will find the book to offer a state-of-the-art survey of quality and reliability management and practices.

  9. Technology usage, quality management system, and service quality in Thailand.

    Science.gov (United States)

    Sivabrovornvatana, Nilubon; Siengthai, Sununta; Krairit, Donyaprueth; Paul, Himangshu

    2005-01-01

    This article aims to explore the relationship between technology and quality management for enhancing Thai hospital service quality. The paper presents the findings of an exploratory study that investigates service quality from the customer and service provider perception. In-depth interviews were conducted with respondents in Thai hospitals. The interviews explored service-related factors that patients and service providers perceive to be important for hospital services. The first interview group consisted of professionals as internal customers in direct contact with external customers, while the second group consisted of external customers of the same hospitals. The study's outcomes clearly suggest factors that make significant contribution to service quality. These factors can be categorized according to five SERVQUAL dimensions (reliability, responsiveness, assurance, empathy, and tangibility), although some factors required slightly different interpretation. The findings suggest that hospitals can develop an appropriate approach to their advantage, which can yield sustainable improvement in service quality as perceived by patients and professionals. Hospitals can make better quality decisions based on structured measurement and knowledge. It is recommended that managers apply this knowledge for successful implementation of activities related to service quality in their organizations.

  10. Factors Affecting Time, Cost and Quality Management in Building ...

    African Journals Online (AJOL)

    The study is an assessment of time, cost and quality management in the Nigerian construction industry, and it aims to explore time cost and quality management in the construction industry. The objective of the study is to identify factors affecting time; cost and quality management in building construction projects. This study ...

  11. 48 CFR 1631.205-74 - FEHBP losses on other contracts.

    Science.gov (United States)

    2010-10-01

    ... carry forward” principle that is fundamental to continuing insurance contracts that are based on... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-74 FEHBP losses on...

  12. Nurse managers' work life quality and their participation in knowledge management: a correlational study.

    Science.gov (United States)

    Hashemi Dehaghi, Zahra; Sheikhtaheri, Abbas; Dehnavi, Fariba

    2015-01-01

    The association between quality of work life and participation in knowledge management is unknown. This study aimed to discover the association between quality of work life of nurse managers and their participation in implementing knowledge management. This was a correlational study. All nurse managers (71 people) from 11 hospitals affiliated with the Social Security Organization in Tehran, Iran, were included. They were asked to rate their participation in knowledge management and their quality of work life. Data was gathered by a researcher-made questionnaire (May-June 2012). The questionnaire was validated by content and construct validity approaches. Cronbach's alpha was used to evaluate reliability. Finally, 50 questionnaires were analyzed. The answers were scored and analyzed using mean of scores, T-test, ANOVA (or nonparametric test, if appropriate), Pearson's correlation coefficient and linear regression. Nurse managers' performance to implement knowledge management strategies was moderate. A significant correlation was found between quality of work life of nurse managers and their participation in implementing knowledge management strategies (r = 0.82; P The strongest correlations were found between implementation of knowledge management and participation of nurse managers in decision making (r = 0.82; P knowledge management.

  13. What is Total Quality Management?

    Science.gov (United States)

    Bryan, William A.

    1996-01-01

    Provides a general overview of Total Quality Management (TQM) and explains why there is pressure for change in higher education institutions. Defines TQM and the various themes, tools, and beliefs that make it different from other management approaches. Presents 14 principles and how they might be applied to student affairs. (RJM)

  14. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  15. Manager personality, manager service quality orientation, and service climate: test of a model.

    Science.gov (United States)

    Salvaggio, Amy Nicole; Schneider, Benjamin; Nishii, Lisa H; Mayer, David M; Ramesh, Anuradha; Lyon, Julie S

    2007-11-01

    This article conceptually and empirically explores the relationships among manager personality, manager service quality orientation, and climate for customer service. Data were collected from 1,486 employees and 145 managers in grocery store departments (N = 145) to test the authors' theoretical model. Largely consistent with hypotheses, results revealed that core self-evaluations were positively related to managers' service quality orientation, even after dimensions of the Big Five model of personality were controlled, and that service quality orientation fully mediated the relationship between personality and global service climate. Implications for personality and organizational climate research are discussed. (c) 2007 APA

  16. Quality management in shipping. Case study: Maersk Line Denmark

    Directory of Open Access Journals (Sweden)

    Anca MADAR

    2016-07-01

    Full Text Available Quality assurance has become very important to the majority of production or service companies with international activity. Maritime transport companies were also required to take measures to implement a quality management system. Because of navigation accidents that had a significant impact on shipping, there was designed a ship safety management code. To put into practice the quality management system, each company adopts specific quality strategies according to their activity.

  17. Quality control through dosimetry at a contract radiation processing facility

    International Nuclear Information System (INIS)

    Du Plessis, T.A.; Roediger, A.H.A.

    1985-01-01

    Reliable dosimetry procedures constitute a very important part of process control and quality assurance at a contract gamma radiation processing facility that caters for a large variety of different radiation applications. The choice, calibration and routine intercalibration of the dosimetry systems employed form the basis of a sound dosimetry policy in radiation processing. With the dosimetric procedures established, detailed dosimetric mapping of the irradiator upon commissioning (and whenever source modifications take place) is carried out to determine the radiation processing characteristics and peformance of the plant. Having established the irradiator parameters, routine dosimetry procedures, being part of the overall quality control measures, are employed. In addition to routine dosimetry, independent monitoring of routine dosimetry is performed on a bi-monthly basis and the results indicate a variation of better than 3%. On an annaul basis the dosimetry systems are intercalibrated through at least one primary standard dosimetry laboratory and to date a variation of better than 5% has been experienced. The company also participates in the Pilot Dose Assurance Service of the International Atomic Energy Agency, using the alanine/ESR dosimetry system. Routine calibration of the instrumentation employed is carried out on a regular basis. Detailed permanent records are compiled on all dosimetric and instrumentation calibrations, and the routine dosimetry employed at the plant. Certificates indicating the measured absorbed radiation doses are issued on request and in many cases are used for the dosimetric release of sterilized medical and pharmaceutical products. These procedures, used by Iso-Ster at its industrial gamma radiation facility, as well as the experience built up over a number of years using radiation dosimetry for process control and quality assurance are discussed. (author)

  18. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-01-01

    This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for 'error-free' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. (orig.)

  19. The changing psychological contract at work and employee burnout.

    Science.gov (United States)

    Malach Pines, Ayala

    2002-01-01

    Today we stand in a vortex of technological, economic, and cultural changes that altered dramatically the world of labor and with it the psychological contract between employers and employees. While the effects of the changed contract at work are usually addressed from an organizational, social or economic perspective, the current article addresses it from a psychological perspective from which one noteworthy cost of the changed psychological contract is employee burnout. The article describes burnout, differentiates it from stress, and proposes an existential perspective to explain its underlying dynamic, using the results of a cross-cultural study of Israeli and American managers as an example. Recent studies on gender differences in management are used to point in the recommended for preventing employee burnout, despite the new psychological contract, namely--a democratic, egalitarian management style.

  20. Analysis of Management Practices in Lagos State Tertiary Institutions through Total Quality Management Structural Framework

    Science.gov (United States)

    AbdulAzeez, Abbas Tunde

    2016-01-01

    This research investigated total quality management practices and quality teacher education in public tertiary institutions in Lagos State. The study was therefore designed to analyse management practices in Lagos state tertiary institutions through total quality management structural framework. The selected public tertiary institutions in Lagos…

  1. The main aspects of methodology of quality management system

    Directory of Open Access Journals (Sweden)

    Smirnova E.K.

    2017-03-01

    Full Text Available this article describes the formation and development of quality management as an integrated system. The author considers the theory and methodology of quality management since the early XXth century to the present day and describes the main problems encountered in the process of quality management system, as well as the ways to overcome them.

  2. Lessee´s Liabilities In The Leasing Housing Contract Intended For Family Dwelling Purposes Not Related To His Holder Quality

    Directory of Open Access Journals (Sweden)

    Maria Cristina Arrieta Blanquicett

    2015-07-01

    Full Text Available The leasing housing contract intended for family dwelling purposes was enforced in Colombia for nearly a decade, being quite useful for developing the country economy, in particular for the purchase of home. Despite the usefulness when executing it, several conflicts have arisen, reason why it is mandatory to build a legal regulation harmonized with its philosophy, such as “Creating new long and medium-term home financing mechanisms in Colombia”. All the foregoing in order to give a wide development to the postulate set forth in article 51 of the Political Constitution of 1991 that ensures the right to access to a decent housing. Since the legal regulation of housing leasing intended to family dwelling has been scarce and keeping in mind its atypical nature, it is required to identify what are the liabilities that arise to the contracting parties, in particular to the lessee, taking into account that between him and the good given in leasing there is a tenure relation. The leasing housing contract intended for family dwelling purposes besides of being an atypical contract is also a finance nature contract for which reason the entities authorized to enter into such type of transactions impose to the lessee several clauses that might be unrelated to the holder quality of the lessee; and thus, could turn out to be abusive in the light of the Political Constitution, the law and the doctrine regarding to the protection to the consumer. In conformity with the above mentioned reality, both the legislator and the Constitutional Court have set forth the guidelines to implement the mechanisms that seek for the protection of the lessee, bearing in mind that the subject matter of the housing leasing contract intended to family dwelling falls on a human right. Therefore, it is helpful to identify which are the liabilities of the lessee that are not related to his quality as holder in order to be able to assess them and conclude that they are in conflict

  3. Air quality management in Botswana

    Directory of Open Access Journals (Sweden)

    Modupe O. Akinola

    2017-06-01

    Full Text Available This paper examines air pollution situation and the history of air quality management in Botswana. The current air quality management in Botswana is still largely underpinned by the Atmospheric Pollution Prevention Act of 1971, supplemented by the more recently enacted legislations such as the Environmental Impact Assessment (EIA Act of 2010 and the Ambient Air Quality - Limits for Common Pollutants of 2012 published by the Botswana Bureau of Standards. Though commendable efforts have been made toward legislating against air and other forms of pollution, these have not yielded expected results in view of the prevailing levels of air pollutants like sulphur dioxide and fine particulate matters in the country’s atmospheric environment. Legislation as a sole measure may not be effective in tackling this challenge. Rather, government should also address some root-causes of the problem by making policies and programmes that will reduce unemployment and increase the earning capacity of citizenry. This will, among other things, effectively check poverty-induced biomass burning in the country. The paper looks at some other challenges of air pollution management and suggestions are made to tackle the identified problems.

  4. Data Quality- and Master Data Management - A Hospital Case.

    Science.gov (United States)

    Arthofer, Klaus; Girardi, Dominic

    2017-01-01

    Poor data quality prevents the analysis of data for decisions which are critical for business. It also has a negative impact on business processes. Nevertheless the maturity level of data quality- and master data management is still insufficient in many organizations nowadays. This article discusses the corresponding maturity of companies and a management cycle integrating data quality- and master data management in a case dealing with benchmarking in hospitals. In conclusion if data quality and master data are not properly managed, structured data should not be acquired in the first place due to the added expense and complexity.

  5. 48 CFR 927.303 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  6. 48 CFR 1845.106-70 - NASA contract clauses and solicitation provision.

    Science.gov (United States)

    2010-10-01

    ... will vest in the Government prior to delivery. (e) When approved by the Logistics Management Division... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 1845.106-70 NASA contract... to the SEMO's concurrence that adequate installation property management resources are available for...

  7. 7 CFR 250.53 - Contract provisions.

    Science.gov (United States)

    2010-01-01

    ... the food service management company will ensure that its system of inventory management will not... recipient agency's fixed-price contract with a food service management company. Such provisions must also be... management company must credit the recipient agency for the value of all donated foods received for use in...

  8. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-06-01

    The Pacific Northwest Laboratory (PNL) is a US Department of Energy (DOE) multi-program national laboratory. PNL develops waste management processes and techniques as well as providing management services for characterization and remediation of radioactive and/or hazardous waste sites for the DOE. This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for ''error-free'' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. 6 refs

  9. Information Architecture for Quality Management Support in Hospitals.

    Science.gov (United States)

    Rocha, Álvaro; Freixo, Jorge

    2015-10-01

    Quality Management occupies a strategic role in organizations, and the adoption of computer tools within an aligned information architecture facilitates the challenge of making more with less, promoting the development of a competitive edge and sustainability. A formal Information Architecture (IA) lends organizations an enhanced knowledge but, above all, favours management. This simplifies the reinvention of processes, the reformulation of procedures, bridging and the cooperation amongst the multiple actors of an organization. In the present investigation work we planned the IA for the Quality Management System (QMS) of a Hospital, which allowed us to develop and implement the QUALITUS (QUALITUS, name of the computer application developed to support Quality Management in a Hospital Unit) computer application. This solution translated itself in significant gains for the Hospital Unit under study, accelerating the quality management process and reducing the tasks, the number of documents, the information to be filled in and information errors, amongst others.

  10. 48 CFR 237.102-72 - Contracts for management services.

    Science.gov (United States)

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  11. A Study of Contract Broiler Production in Lombok, NTB: An Opportunity of Introducing Syariah Partnership

    Directory of Open Access Journals (Sweden)

    B. Indarsih

    2010-08-01

    Full Text Available A study to evaluate the implementation of integrated poultry production through contract farming system in Lombok, NTB was carried out from June to November 2009. The descriptive methods were used whilst the data was collected using survey methods. Fifty contract farmers were selected to measure the business performance with references on management, performance production index, FCR, and percentage of mortality. The results of this study indicated that the contract broiler production was chosen due to: (1 risk sharing (27.6%, financial credits (25.8%, and the guarantee of marketing (23.3 %. Dissatisfaction particularly in aspects of incentive determination, the quota, and margins. The margin ratios between farmers and integrators, 30%: 70%; 40%: 60% or 50%: 50% with no clear reasons. Performance parameter was as an expectation, suggesting feed quality and management aspects were well implemented. In respect to Syariah bank, its outstanding was well understood but it have not been attractive to the contract farmers. The capital is not the main reason to work with the integrators. The government involvement was needed to encourage poultry industry growth and looking for the new potential region and legislation on maintaining environment. New investors should be encouraged to overcome instability price.

  12. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    The Defense Finance and Accounting Service planned to replace the payment and entitlement function performed by the Mechanization of Contract Administration Services system with a new or modified system...

  13. Application of Total Quality Management in Education

    Science.gov (United States)

    Farooq, M. S.; Akhtar, M. S.; Ullah, S. Zia; Memon, R. A.

    2007-01-01

    The purpose of the paper is to analyzing thoughts of the modern management paradigm "Total Quality Management" (TQM), and its application in the field of education. The basic theme of TQM is participatory approach to address the question(s) of quality in business aswell as in the field of education. Reviewing fresh literature from the internet …

  14. DUQuE quality management measures: associations between quality management at hospital and pathway levels.

    Science.gov (United States)

    Wagner, Cordula; Groene, Oliver; Thompson, Caroline A; Dersarkissian, Maral; Klazinga, Niek S; Arah, Onyebuchi A; Suñol, Rosa

    2014-04-01

    The assessment of integral quality management (QM) in a hospital requires measurement and monitoring from different perspectives and at various levels of care delivery. Within the DUQuE project (Deepening our Understanding of Quality improvement in Europe), seven measures for QM were developed. This study investigates the relationships between the various quality measures. It is a multi-level, cross-sectional, mixed-method study. As part of the DUQuE project, we invited a random sample of 74 hospitals in 7 countries. The quality managers of these hospitals were the main respondents. Furthermore, data of site visits of external surveyors assessing the participating hospitals were used. Three measures of QM at hospitals level focusing on integral systems (QMSI), compliance with the Plan-Do-Study-Act quality improvement cycle (QMCI) and implementation of clinical quality (CQII). Four measures of QM activities at care pathway level focusing on Specialized expertise and responsibility (SER), Evidence-based organization of pathways (EBOP), Patient safety strategies (PSS) and Clinical review (CR). Positive significant associations were found between the three hospitals level QM measures. Results of the relationships between levels were mixed and showed most associations between QMCI and department-level QM measures for all four types of departments. QMSI was associated with PSS in all types of departments. By using the seven measures of QM, it is possible to get a more comprehensive picture of the maturity of QM in hospitals, with regard to the different levels and across various types of hospital departments.

  15. 48 CFR 923.903 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contractor Compliance With Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at.... Some DOE sites have a single Environmental Management System for the site while others have separate...

  16. How Accountable Care Organizations Responded to Pediatric Incentives in the Alternative Quality Contract.

    Science.gov (United States)

    Chien, Alyna T; Schiavoni, Katherine H; Sprecher, Eli; Landon, Bruce E; McNeil, Barbara J; Chernew, Michael E; Schuster, Mark A

    2016-03-01

    From 2009 to 2010, 12 accountable care organizations (ACOs) entered into the alternative quality contract (AQC), BlueCross BlueShield of Massachusetts's global payment arrangement. The AQC included 6 outpatient pediatric quality measures among 64 total measures tied to pay-for-performance bonuses and incorporated pediatric populations in their global budgets. We characterized the pediatric infrastructure of these adult-oriented ACOs and obtained leaders' perspectives on their ACOs' response to pediatric incentives. We used Massachusetts Health Quality Partners and American Hospital Association Survey data to characterize ACOs' pediatric infrastructure as extremely limited, basic, and substantial on the basis of the extent of pediatric primary care, outpatient specialist, and inpatient services. After ACOs had 16 to 43 months of experience with the AQC, we interviewed 22 leaders to gain insight into how organizations made changes to improve pediatric care quality, tried to reduce pediatric spending, and addressed care for children with special health care needs. ACOs' pediatric infrastructure ranged from extremely limited (eg, no general pediatricians in their primary care workforce) to substantial (eg, 42% of workforce was general pediatricians). Most leaders reported intensifying their pediatric quality improvement efforts and witnessing changes in quality metrics; most also investigated pediatric spending patterns but struggled to change patients' utilization patterns. All reported that the AQC did little to incentivize care for children with special health care needs and that future incentive programs should include this population. Although ACOs involved in the AQC were adult-oriented, most augmented their pediatric quality improvement and spending reduction efforts when faced with pediatric incentives. Copyright © 2016 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  17. Fit for purpose quality management system for military forensic exploitation.

    Science.gov (United States)

    Wilson, Lauren Elizabeth; Gahan, Michelle Elizabeth; Robertson, James; Lennard, Chris

    2018-03-01

    In a previous publication we described a systems approach to forensic science applied in the military domain. The forensic science 'system of systems' describes forensic science as a sub-system in the larger criminal justice, law enforcement, intelligence, and military systems, with quality management being an important supporting system. Quality management systems help to ensure that organisations achieve their objective and continually improve their capability. Components of forensic science quality management systems can include standardisation of processes, accreditation of facilities to national/international standards, and certification of personnel. A fit for purpose quality management system should be balanced to allow organisations to meet objectives, provide continuous improvement; mitigate risk; and impart a positive quality culture. Considerable attention over the last decades has been given to the need for forensic science quality management systems to meet criminal justice and law enforcement objectives. More recently, the need for the forensic quality management systems to meet forensic intelligence objectives has been considered. This paper, for the first time, discusses the need for a fit for purpose quality management system for military forensic exploitation. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  18. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  20. Food quality and safety management

    Directory of Open Access Journals (Sweden)

    Agnieszka Bilska

    2014-09-01

    Full Text Available Ensuring quality and safety of food are nowadays the most important goals set by companies who produce and distribute it. As a result, regulations have been introduced in the European Union countries concerning the production and distribution of food as well as norms which oblige companies to implement and execute several quality management systems.