  1. Numerical simulation studies of gas production scenarios from hydrate accumulations at the Mallik Site, McKenzie Delta, Canada

    International Nuclear Information System (INIS)

    Moridis, George J.; Collett, Timothy S.; Dallimore, Scott R.; Satoh, Tohru; Hancock, Stephen; Weatherill, Brian

    2002-01-01

    The Mallik site represents an onshore permafrost-associated gas hydrate accumulation in the Mackenzie Delta, Northwest Territories, Canada. An 1150 m deep gas hydrate research well was drilled at the site in 1998. The objective of this study is the analysis of various gas production scenarios from several gas-hydrate-bearing zones at the Mallik site. The TOUGH2 general-purpose simulator with the EOSHYDR2 module were used for the analysis. EOSHYDR2 is designed to model the non-isothermal CH(sub 4) (methane) release, phase behavior and flow under conditions typical of methane-hydrate deposits by solving the coupled equations of mass and heat balance, and can describe any combination of gas hydrate dissociation mechanisms. Numerical simulations indicated that significant gas hydrate production at the Mallik site was possible by drawing down the pressure on a thin free-gas zone at the base of the hydrate stability field. Gas hydrate zones with underlying aquifers yielded significant gas production entirely from dissociated gas hydrate, but large amounts of produced water. Lithologically isolated gas-hydrate-bearing reservoirs with no underlying free gas or water zones, and gas-hydrate saturations of at least 50% were also studied. In these cases, it was assumed that thermal stimulation by circulating hot water in the well was the method used to induce dissociation. Sensitivity studies indicated that the methane release from the hydrate accumulations increases with gas-hydrate saturation, the initial formation temperature, the temperature of the circulating water in the well, and the formation thermal conductivity. Methane production appears to be less sensitive to the rock and hydrate specific heat and permeability of the formation

  2. Progress in the ICDP Mallik 2002 Data and Information System

    Science.gov (United States)

    Loewner, R.; Conze, R.; Mallik Working Group

    2003-04-01

    This contribution forms part of the scientific activities for the Mallik 2002 Production Research Well Program. The program participants include 8 partners: The Geological Survey of Canada (GSC), The Japan National Oil Corporation (JNOC), GeoForschungsZentrum Potsdam (GFZ), United States Geological Survey (USGS), United States Department of the Energy (USDOE), India Ministry of Petroleum and Natural Gas (MOPNG)/Gas Authority of India (GAIL) and the Chevron-BP-Burlington joint venture group. Since December 2001 the scientific investigations of the Mallik Gas Hydrate Production Research Well Program in the Canadian Mackenzie Delta were supported by a new Data and Information System. Due to the particular conditions and characteristics of methane drilling projects, we were able to elaborate a data management system in three main phases. These phases were realized very close in time and space to the activities and operations at the drill site, and in the laboratories of the Inuvik Research Center: 1. The first approach was to set up a database structure supported by the ICDP Drilling Information System (DIS) during the planning phase since fall 2001. This system encompasses various components helping in administration and operation of the system as well as in presentation of the data. 2. During the second phase, the drilling period of the main well hole (Mallik5L-38), we installed the Mallik-DIS in a small local network at the Inuvik Research Center, and maintained this system for data acquisition and core scanning. Each day we transferred all digital core pictures and archiving information of the core runs to the confidential Mallik Web sites, under extremely high security precautions. 3. While the scientific evaluation phase still continues since end of March 2002, several data sets have been already collected, prepared and incorporated into the Mallik Data Warehouse. These processed data have been made available on the Mallik Web sites within the ICDP Information

  3. Numerical studies of gas production from several CH4 hydrate zones at the Mallik site, Mackenzie Delta, Canada

    Science.gov (United States)

    Moridis, G.J.; Collett, T.S.; Dallimore, S.R.; Satoh, T.; Hancock, S.; Weatherill, B.

    2004-01-01

    The Mallik site represents an onshore permafrost-associated gas hydrate accumulation in the Mackenzie Delta, Northwest Territories, Canada. A gas hydrate research well was drilled at the site in 1998. The objective of this study is the analysis of various gas production scenarios from five methane hydrate-bearing zones at the Mallik site. In Zone #1, numerical simulations using the EOSHYDR2 model indicated that gas production from hydrates at the Mallik site was possible by depressurizing a thin free gas zone at the base of the hydrate stability field. Horizontal wells appeared to have a slight advantage over vertical wells, while multiwell systems involving a combination of depressurization and thermal stimulation offered superior performance, especially when a hot noncondensible gas was injected. Zone #2, which involved a gas hydrate layer with an underlying aquifer, could yield significant amounts of gas originating entirely from gas hydrates, the volumes of which increased with the production rate. However, large amounts of water were also produced. Zones #3, #4 and #5 were lithologically isolated gas hydrate-bearing deposits with no underlying zones of mobile gas or water. In these zones, thermal stimulation by circulating hot water in the well was used to induce dissociation. Sensitivity studies indicated that the methane release from the hydrate accumulations increased with the gas hydrate saturation, the initial formation temperature, the temperature of the circulating water in the well, and the formation thermal conductivity. Methane production appears to be less sensitive to the specific heat of the rock and of the hydrate, and to the permeability of the formation. ?? 2004 Published by Elsevier B.V.

  4. Progress in the Mallik 2002 Data and Information System

    Science.gov (United States)

    Loewner, R.; Conze, R.; Laframboise, R. R.; Working Group, M.

    2002-12-01

    Since December 2001 scientific investigations in a gas hydrate research well program were undertaken in the Mackenzie Delta in the Canadian Arctic, supported by a new Data and Information System. The program comprised a main production well and two scientific observation wells. During the drilling period of the main Mallik well hole we were able to elaborate an information system very close in time and space to the activities and operations at the drill site and in the laboratories of the Inuvik Research Center. Due to the particular conditions and characteristics of Methane Drilling Projects, the technical realization and the structure of the data management required adapted individual solutions. On the one hand, the physical properties of the Methane and the climate in the Arctic enforced working under extreme conditions not only for the staff but also for the technical equipment. On the other hand, the sensitive data demanded security on a very high level. Considering these characteristics, a database structure has been set up successfully on a server in Inuvik, supported by our Drilling Information System (DIS). The drilling period ended in March 2002 and the scientific evaluation phase began. Until now a detailed database with all on-site gained information and data from the succeeding analyses has been made available in the ICDP information network (http://www.icdp-online.de/html/sites/mallik/index/index.html). Lithological descriptions, borehole measurements, monitoring data and an archive of all the core runs and samples are stored in the Mallik Data Warehouse. A request started from the Internet generates results dynamically which accomplish the needs of the user. The user even can generate own litho-logs which enables him/her to compare all kinds of borehole information for his/her scientific work. All these functions and sevices are covered by an highly sophisticated security management due to different defined areas of confidentiality within the Mallik

  5. McKenzie River Subbasin Assessment, Summary Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Alsea Geospatial, Inc.

    2000-02-01

    This document summarizes the findings of the McKenzie River Subbasin Assessment: Technical Report. The subbasin assessment tells a story about the McKenzie River watershed. What is the McKenzie's ecological history, how is the McKenzie doing today, and where is the McKenzie watershed headed ecologically? Knowledge is a good foundation for action. The more we know, the better prepared we are to make decisions about the future. These decisions involve both protecting good remaining habitat and repairing some of the parts that are broken in the McKenzie River watershed. The subbasin assessment is the foundation for conservation strategy and actions. It provides a detailed ecological assessment of the lower McKenzie River and floodplain, identifies conservation and restoration opportunities, and discusses the influence of some upstream actions and processes on the study area. The assessment identifies restoration opportunities at the reach level. In this study, a reach is a river segment from 0.7 to 2.7 miles long and is defined by changes in land forms, land use, stream junctions, and/or cultural features. The assessment also provides flexible tools for setting priorities and planning projects. The goal of this summary is to clearly and concisely extract the key issues, findings, and recommendations from the full-length Technical Report. The high priority recommended action items highlight areas that the McKenzie Watershed Council can significantly influence, and that will likely yield the greatest ecological benefit. People are encouraged to read the full Technical Report if they are interested in the detailed methods, findings, and references used in this study.

  6. Awadesh Kumar Mallik

    Indian Academy of Sciences (India)

    Home; Journals; Bulletin of Materials Science. AWADESH KUMAR MALLIK. Articles written in Bulletin of Materials Science. Volume 38 Issue 3 June 2015 pp 717-724. Influence of growth conditions on microstructure and defects in diamond coatings grown by microwave plasma enhanced CVD · Kalyan Sundar Pal Sandip ...

  7. Broadband Seismic Studies at the Mallik Gas Hydrate Research Well

    Science.gov (United States)

    Sun, L. F.; Huang, J.; Lyons-Thomas, P.; Qian, W.; Milkereit, B.; Schmitt, D. R.

    2005-12-01

    The JAPEX/JNOC/GSC et al. Mallik 3L-38, 4L-38 and 5L-38 scientific wells were drilled in the MacKenzie Delta, NWT, Canada in early 2002 primarily for carrying out initial tests of the feasibility of producing methane gas from the large gas hydrate deposits there [1]. As part of this study, high resolution seismic profiles, a pseudo-3D single fold seismic volume and broadband (8~180Hz) multi-offset vertical seismic profiles (VSP) were acquired at the Mallik site. Here, we provide details on the acquisition program, present the results of the 2D field profile, and discuss the potential implications of these observations for the structure of the permafrost and gas hydrate zones. These zones have long been problematic in seismic imaging due to the lateral heterogeneities. Conventional seismic data processing usually assume a stratified, weak-contrast elastic earth model. However, in permafrost and gas hydrate zones this approximation often becomes invalid. This leads to seismic wave scattering caused by multi-scale perturbation of elastic properties. A 3D viscoelastic finite difference modeling algorithm was employed to simulate wave propagation in a medium with strong contrast. Parameters in this modeling analysis are based on the borehole geophysical log data. In addition, an uncorrelated Vibroseis VSP data set was studied to investigate frequency-dependent absorption and velocity dispersion. Our results indicate that scattering and velocity dispersion are important for a better understanding of attenuation mechanisms in heterogeneous permafrost and gas hydrate zones. [1] Dallimore, S.R., Collett, T.S., Uchida, T., and Weber, M., 2005, Overview of the science program for the Mallik 2002 Gas Hydrate Production Research Well Program; in Scientific Results from Mallik 2002 Gas Hydrate production Research Well Program, MacKenzie Delta, Northwest Territories, Canada, (ed.) S.R. Dallimore and T.S. Collett; Geological Survey of Canada, Bulletin 585, in press.

  8. Reconnaissance of land-use sources of pesticides in drinking water, McKenzie River, Oregon

    Science.gov (United States)

    Kelly, Valerie J.; Anderson, Chauncey W.; Morgenstern, Karl

    2012-01-01

    The Eugene Water and Electric Board (EWEB) provides water and electricity to the City of Eugene, Oregon, from the McKenzie River. In the spring of 2002, EWEB initiated a pesticide monitoring program in cooperation with the U.S. Geological Survey as part of their Drinking Water Source Protection Plan. Approximately twice yearly pesticide samples were collected from 2002 to 2010 at a suite of sampling sites representing varying land uses in the lower McKenzie River basin. A total of 117 ambient samples were collected from 28 tributary and mainstem sites, including those dominated by forestry, urban, and agricultural activities, as well as the mouths of major tributaries characterized by a mixture of upstream land use. Constituents tested included 175 compounds in filtered water (72 herbicides, 43 insecticides, 10 fungicides, and 36 of their degradation products, as well as 14 pharmaceutical compounds). No attempt was made to sample different site types equivalently; sampling was instead designed primarily to characterize representative storm events during spring and fall runoff conditions in order to assess or confirm the perceived importance of the different site types as sources for pesticides. Sampling was especially limited for agricultural sites, which were only sampled during two spring storm surveys. A total of 43 compounds were detected at least once, with many of these detected only at low concentrations (urban stormwater drains. Urban sites also were associated with the highest concentrations, occasionally exceeding 1 microgram per liter. Many of the compounds detected at urban sites were relatively hydrophobic (do not mix easily with water), persistent, and suspected of endocrine disruption. In contrast, forestry compounds were rarely detectable in the McKenzie River, even though forest land predominates in the basin and forestry pesticide use was detected in small tributaries draining forested lands following application. Agricultural pesticide runoff was

  9. Mallik data and information system : development of a scientific data exchange platform

    Energy Technology Data Exchange (ETDEWEB)

    Lowner, R.; Conze, R. [GeoForschungsZentrum Potsdam, Potsdam (Germany)

    2005-07-01

    The Mallik Data and Information System (Mallik DIS) includes 3 main components which make it possible to acquire, integrate and disseminate interdisciplinary data from the Mallik 2002 Gas Hydrate Production Research Well Program. The system provides a secure and accessible archive of quality controlled scientific results of the project. The 3 main components are: (1) a digital scanner which produces a catalogue of digital core images, (2) the data warehouse which is a vital database and archive that provides members of the Mallik team with access to project data sets via Internet, and (3) the web portal of the International Continental Scientific Drilling Program information network which allows the separate data sets to be retrieved, viewed and integrated with other project data sets.

  10. McKenzie River Subbasin Assessment, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Alsea Geospatial, Inc.

    2000-02-01

    This document details the findings of the McKenzie River Subbasin Assessment team. The goal of the subbasin assessment is to provide an ecological assessment of the McKenzie River Floodplain, identification of conservation and restoration opportunities, and discussion of the influence of some upstream actions and processes. This Technical Report can be viewed in conjunction with the McKenzie River Subbasin Summary or as a stand-alone document. The purpose of the technical report is to detail the methodology and findings of the consulting team that the observations and recommendations in the summary document are based on. This part, Part I, provides an introduction to the subbasin and a general overview. Part II details the specific findings of the science team. Part III provides an explanation and examples of how to use the data that has been developed through this assessment to aid in prioritizing restoration activities. Part III also includes the literature cited and appendices.

  11. Detailed evaluation of gas hydrate reservoir properties using JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well downhole well-log displays

    Science.gov (United States)

    Collett, T.S.

    1999-01-01

    The JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well project was designed to investigate the occurrence of in situ natural gas hydrate in the Mallik area of the Mackenzie Delta of Canada. Because gas hydrate is unstable at surface pressure and temperature conditions, a major emphasis was placed on the downhole logging program to determine the in situ physical properties of the gas-hydrate-bearing sediments. Downhole logging tool strings deployed in the Mallik 2L-38 well included the Schlumberger Platform Express with a high resolution laterolog, Array Induction Imager Tool, Dipole Shear Sonic Imager, and a Fullbore Formation Microlmager. The downhole log data obtained from the log- and core-inferred gas-hydrate-bearing sedimentary interval (897.25-1109.5 m log depth) in the Mallik 2L-38 well is depicted in a series of well displays. Also shown are numerous reservoir parameters, including gas hydrate saturation and sediment porosity log traces, calculated from available downhole well-log and core data. The gas hydrate accumulation delineated by the Mallik 2L-38 well has been determined to contain as much as 4.15109 m3 of gas in the 1 km2 area surrounding the drill site.

  12. The effects of McKenzie and Brunkow exercise program on spinal mobility comparative study

    Directory of Open Access Journals (Sweden)

    Emela Mujić Skikić

    2004-02-01

    Full Text Available This study encompassed 64 participants with symptoms of low back pain, 33 in McKenzie group and 31 in Brunkow group. Patients attended exercise program daily and they were asked to do the same exercise at home--five times a day in series of 5 to 10 repetition each time, depending of stage of disease and pain intensity. All patients were assessed for the spinal motion, before and after the treatment. All parameters for spinal movements showed improvement after exercising McKenzie program for lower back pain with a significant difference of p<0.01 for all motions. Also, in Brunkow group, all of the parameters showed statistically significant improvement at the end of treatment in relation to pre-treatment values, with significant difference of p<0.01 for all motions. Statistically comparison between McKenzie and Brunkow difference in score at the end of the treatment showed statistically significant improvement in McKenzie group, for extension, right and left side flexion, while flexion score didn't show statistically significant difference. McKenzie exercises seemed to be more effective than Brunkow exercises for improvement in spinal motion. Both, McKenzie and Brunkow exercises can be used for spinal mobility improvement in patients with lower back pain, but is preferable to use McKenzie exercises first, to decrease the pain and increase spinal mobility, and then Brunkow exercises to strengthen the paravertebral muscles.

  13. Effective-Medium Models for Marine Gas Hydrates, Mallik Revisited

    Science.gov (United States)

    Terry, D. A.; Knapp, C. C.; Knapp, J. H.

    2011-12-01

    Hertz-Mindlin type effective-medium dry-rock elastic models have been commonly used for more than three decades in rock physics analysis, and recently have been applied to assessment of marine gas hydrate resources. Comparisons of several effective-medium models with derivative well-log data from the Mackenzie River Valley, Northwest Territories, Canada (i.e. Mallik 2L-38 and 5L-38) were made several years ago as part of a marine gas hydrate joint industry project in the Gulf of Mexico. The matrix/grain supporting model (one of the five models compared) was clearly a better representation of the Mallik data than the other four models (2 cemented sand models; a pore-filling model; and an inclusion model). Even though the matrix/grain supporting model was clearly better, reservations were noted that the compressional velocity of the model was higher than the compressional velocity measured via the sonic logs, and that the shear velocities showed an even greater discrepancy. Over more than thirty years, variations of Hertz-Mindlin type effective medium models have evolved for unconsolidated sediments and here, we briefly review their development. In the past few years, the perfectly smooth grain version of the Hertz-Mindlin type effective-medium model has been favored over the infinitely rough grain version compared in the Gulf of Mexico study. We revisit the data from the Mallik wells to review assertions that effective-medium models with perfectly smooth grains are a better predictor than models with infinitely rough grains. We briefly review three Hertz-Mindlin type effective-medium models, and standardize nomenclature and notation. To calibrate the extended effective-medium model in gas hydrates, we use a well accepted framework for unconsolidated sediments through Hashin-Shtrikman bounds. We implement the previously discussed effective-medium models for saturated sediments with gas hydrates and compute theoretical curves of seismic velocities versus gas hydrate

  14. McKenzie River Watershed Coordination, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Thrailkil, Jim

    2003-11-01

    BPA funding, in conjunction with contributions from numerous partners organizations and grant funds supports the McKenzie Watershed Council's (MWC) efforts to coordinate restoration and monitoring programs of federal, state, local government, and residents within the watershed. Primary goals of the MWC are to improve resource stewardship and conserve fish, wildlife, and water quality resources. Underpinning the goals is the MWC's baseline program centered on relationship building and information sharing. Objectives for FY02 included: (1) Continue to coordinate McKenzie Watershed activities among diverse groups to restore fish and wildlife habitat in the watershed, with a focus on the middle to lower McKenzie, including private lands and the McKenzie-Willamette confluence area; (2) Influence behavior of watershed residents to benefit watershed function though an outreach and education program, utilizing (BPA funded) Assessment and Conservation Strategy information to provide a context for prioritized action; (3) Continue to maintain and sustain a highly functional watershed council; (4) Maintain and improve water quality concerns through the continuation of Council-sponsored monitoring and evaluation programs; and (5) Continue to secure other funding for watershed restoration and protection projects and Council operations.

  15. McKenzie River Focus Watershed Coordination: Year-End Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Thrailkil, Jim

    2000-01-01

    This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management include the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing

  16. Implication of seismic attenuation for gas hydrate resource characterization, Mallik, Mackenzie Delta, Canada

    Science.gov (United States)

    Bellefleur, G.; Riedel, M.; Brent, T.; Wright, F.; Dallimore, S. R.

    2007-10-01

    Wave attenuation is an important physical property of hydrate-bearing sediments that is rarely taken into account in site characterization with seismic data. We present a field example showing improved images of hydrate-bearing sediments on seismic data after compensation of attenuation effects. Compressional quality factors estimated from zero-offset Vertical Seismic Profiling data acquired at Mallik, Northwest Territories, Canada, demonstrate significant wave attenuation for hydrate-bearing sediments. These results are in agreement with previous attenuation estimates obtained from sonic logs and crosshole data at different frequency intervals. The application of an inverse Q-filter to compensate attenuation effects of permafrost and hydrate-bearing sediments improved the resolution of surface 3D seismic data and its correlation with log data, particularly for the shallowest gas hydrate interval. Compensation of the attenuation effects of the permafrost likely explains most of the improvements for the shallow gas hydrate zone. Our results show that characterization of the Mallik gas hydrates with seismic data not corrected for attenuation would tend to overestimate thicknesses and lateral extent of hydrate-bearing strata and hence, the volume of hydrates in place.

  17. Halogen systematics in the Mallik 5L-38 gas hydrate production research well, Northwest Territories, Canada: Implications for the origin of gas hydrates under terrestrial permafrost conditions

    International Nuclear Information System (INIS)

    Tomaru, Hitoshi; Fehn, Udo; Lu, Zunli; Matsumoto, Ryo

    2007-01-01

    The authors report here halogen concentrations in pore waters and sediments collected from the Mallik 5L-38 gas hydrate production research well, a permafrost location in the Mackenzie Delta, Northwest Territories, Canada. Iodine and Br are commonly enriched in waters associated with CH 4 , reflecting the close association between these halogens and source organic materials. Pore waters collected from the Mallik well show I enrichment, by one order of magnitude above that of seawater, particularly in sandy layers below the gas hydrate stability zone (GHSZ). Although Cl and Br concentrations increase with depth similar to the I profile, they remain below seawater values. The increase in I concentrations observed below the GHSZ suggests that I-rich fluids responsible for the accumulation of CH 4 in gas hydrates are preferentially transported through the sandy permeable layers below the GHSZ. The Br and I concentrations and I/Br ratios in Mallik are considerably lower than those in marine gas hydrate locations, demonstrating a terrestrial nature for the organic materials responsible for the CH 4 at the Mallik site. Halogen systematics in Mallik suggest that they are the result of mixing between seawater, freshwater and an I-rich source fluid. The comparison between I/Br ratios in pore waters and sediments speaks against the origin of the source fluids within the host formations of gas hydrates, a finding compatible with the results from a limited set of 129 I/I ratios determined in pore waters, which gives a minimum age of 29 Ma for the source material, i.e. at the lower end of the age range of the host formations. The likely scenario for the gas hydrate formation in Mallik is the derivation of CH 4 together with I from the terrestrial source materials in formations other than the host layers through sandy permeable layers into the present gas hydrate zones

  18. Effects of Attenuation of Gas Hydrate-bearing Sediments on Seismic Data: Example from Mallik, Northwest Territories, Canada

    Science.gov (United States)

    Bellefleur, G.; Riedel, M.; Brent, T.

    2007-05-01

    Wave attenuation is an important physical property of hydrate-bearing sediments that is rarely taken into account in site characterization with seismic data. We present a field example showing improved images of hydrate- bearing sediments on seismic data after compensation of attenuation effects. Compressional quality factors (Q) are estimated from zero-offset Vertical Seismic Profiling data acquired at Mallik, Northwest Territories, Canada. During the last 10 years, two internationally-partnered research drilling programs have intersected three major intervals of sub-permafrost gas hydrates at Mallik, and have successfully extracted core samples containing significant amount of gas hydrates. Individual gas hydrate intervals are up to 40m in thickness and are characterized by high in situ gas hydrate saturation, sometimes exceeding 80% of pore volume of unconsolidated clastic sediments having average porosities ranging from 25% to 40%. The Q-factors obtained from the VSP data demonstrate significant wave attenuation for permafrost and hydrate- bearing sediments. These results are in agreement with previous attenuation estimates from sonic logs and crosshole data at different frequency intervals. The Q-factors obtained from VSP data were used to compensate attenuation effects on surface 3D seismic data acquired over the Mallik gas hydrate research wells. Intervals of gas hydrate on surface seismic data are characterized by strong reflectivity and effects from attenuation are not perceptible from a simple visual inspection of the data. However, the application of an inverse Q-filter increases the resolution of the data and improves correlation with log data, particularly for the shallowest gas hydrate interval. Compensation of the attenuation effects of the permafrost likely explains most of the improvements for the shallow gas hydrate zone. Our results show that characterization of the Mallik gas hydrates with seismic data not corrected for attenuation would tend to

  19. McKenzie River focus watershed coordination: year-end report, 2001; ANNUAL

    International Nuclear Information System (INIS)

    Thrailkil, Jim

    2001-01-01

    BPA funding, in conjunction with contributions from numerous partners organizations, supports the McKenzie Watershed Council's efforts to coordinate restoration and monitoring programs of federal, state, local government, and residents within the watershed. The goal of the MWC is to improve resource stewardship and conserve fish, wildlife, and water quality resources. The MWC will always have a baseline program centered on relationship building and information sharing. Objectives for FY01 included: (1) Continue to coordinate McKenzie Watershed activities among diverse groups that restore fish and wildlife habitat in the watershed, with a focus on the lower McKenzie, including private lands and the McKenzie-Willamette confluence area; (2) Influence behavior of watershed residents to benefit watershed function though a strategic and comprehensive outreach and education program, utilizing Assessment and Conservation Strategy information to provide a context for prioritized action; (3) Continue to maintain and sustain a highly functional watershed council; (4) Maintain and improve water quality concerns through the continuation of Council-sponsored monitoring and evaluation programs; and (5) Continue to secure other funding for watershed restoration and protection projects and Council operations

  20. McKenzie River Focus Watershed Coordination: Fiscal Year 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Runyon, John; Davis-Born, Renee

    1998-01-01

    This report summarizes accomplishments made by the McKenzie River Focus Watershed Council in the areas of coordination and administration during Fiscal Year 1998. Coordination and administration consists of tasks associated with Focus Watershed Council staffing, project management, and public outreach.

  1. Simulating the gas hydrate production test at Mallik using the pilot scale pressure reservoir LARS

    Science.gov (United States)

    Heeschen, Katja; Spangenberg, Erik; Schicks, Judith M.; Priegnitz, Mike; Giese, Ronny; Luzi-Helbing, Manja

    2014-05-01

    LARS, the LArge Reservoir Simulator, allows for one of the few pilot scale simulations of gas hydrate formation and dissociation under controlled conditions with a high resolution sensor network to enable the detection of spatial variations. It was designed and built within the German project SUGAR (submarine gas hydrate reservoirs) for sediment samples with a diameter of 0.45 m and a length of 1.3 m. During the project, LARS already served for a number of experiments simulating the production of gas from hydrate-bearing sediments using thermal stimulation and/or depressurization. The latest test simulated the methane production test from gas hydrate-bearing sediments at the Mallik test site, Canada, in 2008 (Uddin et al., 2011). Thus, the starting conditions of 11.5 MPa and 11°C and environmental parameters were set to fit the Mallik test site. The experimental gas hydrate saturation of 90% of the total pore volume (70 l) was slightly higher than volumes found in gas hydrate-bearing formations in the field (70 - 80%). However, the resulting permeability of a few millidarcy was comparable. The depressurization driven gas production at Mallik was conducted in three steps at 7.0 MPa - 5.0 MPa - 4.2 MPa all of which were used in the laboratory experiments. In the lab the pressure was controlled using a back pressure regulator while the confining pressure was stable. All but one of the 12 temperature sensors showed a rapid decrease in temperature throughout the sediment sample, which accompanied the pressure changes as a result of gas hydrate dissociation. During step 1 and 2 they continued up to the point where gas hydrate stability was regained. The pressure decreases and gas hydrate dissociation led to highly variable two phase fluid flow throughout the duration of the simulated production test. The flow rates were measured continuously (gas) and discontinuously (liquid), respectively. Next to being discussed here, both rates were used to verify a model of gas

  2. Development of an Environmental Flow Framework for the McKenzie River Basin, Oregon

    Science.gov (United States)

    Risley, John; Wallick, J. Rose; Waite, Ian; Stonewall, Adam J.

    2010-01-01

    The McKenzie River is a tributary to the Willamette River in northwestern Oregon. The McKenzie River is approximately 90 miles in length and has a drainage area of approximately 1,300 square miles. Two major flood control dams, a hydropower dam complex, and two hydropower canals significantly alter streamflows in the river. The structures reduce the magnitude and frequency of large and small floods while increasing the annual 7-day minimum streamflows. Stream temperatures also have been altered by the dams and other anthropogenic factors, such as the removal of riparian vegetation and channel simplification. Flow releases from one of the flood control dams are cooler in the summer and warmer in the fall in comparison to unregulated flow conditions before the dam was constructed. In 2006, the Oregon Department of Environmental Quality listed a total of 112.4, 6.3, and 55.7 miles of the McKenzie River basin mainstem and tributary stream reaches as thermally impaired for salmonid rearing, salmonid spawning, and bull trout, respectively. The analyses in this report, along with previous studies, indicate that dams have altered downstream channel morphology and ecologic communities. In addition to reducing the magnitude and frequency of floods, dams have diminished sediment transport by trapping bed material. Other anthropogenic factors, such as bank stabilization, highway construction, and reductions of in-channel wood, also have contributed to the loss of riparian habitat. A comparison of aerial photography taken in 1939 and 2005 showed substantial decreases in secondary channels, gravel bars, and channel sinuosity, particularly along the lower alluvial reaches of the McKenzie River. In addition, bed armoring and incision may contribute to habitat degradation, although further study is needed to determine the extent of these processes. Peak streamflow reduction has led to vegetation colonization and stabilization of formerly active bar surfaces. The large flood control

  3. Vertical seismic profile data from well Mallik 2L-38 for gas hydrate studies

    Energy Technology Data Exchange (ETDEWEB)

    Mi, Y [Calgary Univ., AB (Canada). Dept. of Geology and Geophysics; Walia, R [Victoria Univ., BC (Canada) School of Earth and Ocean Sciences; Hyndman, R [Geological Survey of Canada, Sidney, BC (Canada) Pacific Geoscience Centre

    1999-07-01

    A gas hydrate research well was drilled in the Canadian Arctic to study gas hydrates in a permafrost setting in a collaborative research project between the Japan National Oil Corp., the Geological Survey of Canada and other agencies. The multidisciplinary study included an electromagnetic survey, permafrost and gas hydrate coring, comprehensive downhole geophysical logging and measurement. Laboratory studies concerned studies on recovered cuttings and core including sedimentology, physical properties, geochemistry, and reservoir characteristics of the Mallik gas accumulation. As part of the Mallik 2L-38 field program, a vertical seismic profiling survey was conducted at zero and other offset source positions with three component receiver tools and horizontal and vertical vibration sources. A special effort was made to record shear wave data, which will be used to estimate the effect of gas hydrate on formation velocities and to determine gas hydrate concentration as a function of the Mallik gas accumulation. From the initial VSP analysis, certain conclusions follow: 1) zero offset vertical vibration component Z and horizontal X component data give reliable velocity determination within the gas hydrate formation zone. P wave velocities from offset VSP data show an excellent consistency with that from offset data and with the sonic log. And 2) the VSP data permit reliable identification of gas hydrate bearing zones. Abstract only included.

  4. The effect of hydrate content on seismic attenuation: A case study for Mallik 2L-38 well data, Mackenzie delta, Canada

    Science.gov (United States)

    Chand, Shyam; Minshull, Tim A.

    2004-07-01

    Observations of velocities in sediments containing gas hydrates show that the strength of sediments increases with hydrate saturation. Hence it is expected that the attenuation of these sediments will decrease with increasing hydrate saturation. However, sonic log measurements in the Mallik 2L-38 well and cross hole tomography measurements in the Mallik field have shown that attenuation increases with hydrate saturation. We studied a range of mechanisms by which increasing hydrate saturation could cause increased attenuation. We found that a difference in permeability between the host sediment and the newly formed hydrate can produce the observed effect. We modelled attenuation in terms of Biot and squirt flow mechanisms in composite media. We have used our model to predict observed attenuations in the Mallik 2L-38 well, Mackenzie Delta, Canada.

  5. Fluid Flow Patterns During Production from Gas Hydrates in the Laboratory compared to Field Settings: LARS vs. Mallik

    Science.gov (United States)

    Strauch, B.; Heeschen, K. U.; Priegnitz, M.; Abendroth, S.; Spangenberg, E.; Thaler, J.; Schicks, J. M.

    2015-12-01

    The GFZ's LArge Reservoir Simulator LARS allows for the simulation of the 2008 Mallik gas hydrate production test and the comparison of fluid flow patterns and their driving forces. Do we see the gas flow pattern described for Mallik [Uddin, M. et al., J. Can. Petrol Tech, 50, 70-89, 2011] in a pilot scale test? If so, what are the driving forces? LARS has a network of temperature sensors and an electric resistivity tomography (ERT) enabling a good spatial resolution of gas hydrate occurrences, water and gas distribution, and changes in temperature in the sample. A gas flow meter and a water trap record fluid flow patterns and a backpressure valve has controlled the depressurization equivalent to the three pressure stages (7.0 - 5.0 - 4.2 MPa) applied in the Mallik field test. The environmental temperature (284 K) and confining pressure (13 MPa) have been constant. The depressurization induced immediate endothermic gas hydrate dissociation until re-establishment of the stability conditions by a consequent temperature decrease. Slight gas hydrate dissociation continued at the top and upper lateral border due to the constant heat input from the environment. Here transport pathways were short and permeability higher due to lower gas hydrate saturation. At pressures of 7.0 and 5.0 MPa the LARS tests showed high water flow rates and short irregular spikes of gas production. The gas flow patterns at 4.2 MPa and 3.0MPa resembled those of the Mallik test. In LARS the initial gas surges overlap with times of hydrate instability while water content and lengths of pathways had increased. Water production was at a minimum. A rapidly formed continuous gas phase caused the initial gas surges and only after gas hydrate dissociation decreased to a minimum the single gas bubbles get trapped before slowly coalescing again. In LARS, where pathways were short and no additional water was added, a transport of microbubbles is unlikely to cause a gas surge as suggested for Mallik.

  6. Geologic and porous media factors affecting the 2007 production response characteristics of the JOGMEC/NRCan/AURORA Mallik gas hydrate production research well

    Energy Technology Data Exchange (ETDEWEB)

    Dallimore, S. R.; Wright, J. F.; Nixon, F. M. [Natural Resources Canada, Sidney, BC (Canada). Geological Survey of Canada; Kurihara, M. [Japan Oil Engineering, Tokyo (Japan); Yamamoto, K.; Fujii, T.; Fujii, K.; Numasawa, M.; Yasuda, M. [Japan Oil, Gas, Metals National Corp., Chiba (Japan). Technical Research Centre; Imasato, Y. [Schlumberger K.K., Fuchinombe (Japan)

    2008-07-01

    The joint research project between Japan Oil, Gas and Metals National Corporation (JOGMEC), Natural Resources Canada (NRCan) and the Aurora Research Institute was conducted in an effort to measure and monitor the response of a terrestrial gas hydrate reservoir to pressure draw down. This paper reviewed the geologic setting and porous media conditions of a concentrated gas hydrate production interval between 1093 and 1105 m. The short-duration production test was conducted at the Mallik site in Canada's Mackenzie Delta in April 2007. The production interval consists of a sand-dominated succession with occasional silty sand interbeds. Gas hydrate occurs primarily within the sediment pore spaces, with concentrations ranging between 50-90 per cent. Experiments on pore water salinity and porous media conditions on pressure-temperature stability suggest that the partition between gas hydrate stability and instability should be considered as a phase boundary zone rather than a discrete threshold. The experiment revealed that there are significant changes to the physical properties following gas hydrate dissociation, with sediments containing no hydrate behaving as unconsolidated sands. A strong reservoir response to pressure draw down was observed with increasing gas flow during the testing period. Sand inflow to the well during the test may be attributed to loss of sediment strength during gas hydrate dissociation, with the sediment behaving as a gasified slurry. It was concluded that the gas flow response observed during the 2007 production test at Mallik was highly influenced by porous media properties and by the geological heterogeneities which may initiate high permeability conduits in sediments within the production interval of the Mallik gas hydrate reservoir. 18 refs., 6 figs.

  7. A comparison of the effects of pilates and mckenzie training on pain and general health in men with chronic low back pain: A randomized trial

    Directory of Open Access Journals (Sweden)

    Ali Hasanpour-Dehkordi

    2017-01-01

    Full Text Available Background: Today, chronic low back pain is one of the special challenges in healthcare. There is no unique approach to treat chronic low back pain. A variety of methods are used for the treatment of low back pain, but the effects of these methods have not yet been investigated adequately. Aim: The aim of this study was to compare the effects of Pilates and McKenzie training on pain and general health of men with chronic low back pain. Materials and Methods: Thirty-six patients with chronic low back pain were chosen voluntarily and assigned to three groups of 12 each: McKenzie group, Pilates group, and control group. The Pilates group participated in 1-h exercise sessions, three sessions a week for 6 weeks. McKenzie group performed workouts 1 h a day for 20 days. The control group underwent no treatment. The general health of all participants was measured by the General Health Questionnaire 28 and pain by the McGill Pain Questionnaire. Results: After therapeutic exercises, there was no significant difference between Pilates and McKenzie groups in pain relief (P = 0.327. Neither of the two methods was superior over the other for pain relief. However, there was a significant difference in general health indexes between Pilates and McKenzie groups. Conclusion: Pilates and McKenzie training reduced pain in patients with chronic low back pain, but the Pilates training was more effective to improve general health.

  8. 2016 Oregon Department of Geology and Mineral Industries (DOGAMI) Oregon Lidar: McKenzie River

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Quantum Spatial collected Light Detection and Ranging (LiDAR) data for the Oregon LiDAR Consortium (OLC) McKenzie River study area. This study area is located near...

  9. Overview of the science activities for the 2002 Mallik gas hydrate production research well program, Mackenzie Delta, N.W.T., Canada

    Science.gov (United States)

    Dallimore, S. R.; Collett, T. S.; Uchida, T.; Weber, M.

    2003-04-01

    With the completion of scientific studies undertaken as part of the 1998 Mallik 2L-38 gas hydrate research well, an international research site was established for the study of Arctic natural gas hydrates in the Mackenzie Delta of northwestern Canada. Quantitative well log analysis and core studies reveal multiple gas hydrate layers from 890 m to 1106 m depth, exceeding 110 m in total thickness. High gas hydrate saturation values, which in some cases exceed 80% of the pore volume, establish the Mallik gas hydrate field as one of the most concentrated gas hydrate reservoirs in the world. Beginning in December 2001 and continuing to the middle of March 2002, two 1188 m deep science observation wells were drilled and instrumented and a 1166 m deep production research well program was carried out. The program participants include 8 partners; The Geological Survey of Canada (GSC), The Japan National Oil Corporation (JNOC), GeoForschungsZentrum Potsdam (GFZ), United States Geological Survey (USGS), United States Department of the Energy (USDOE), India Ministry of Petroleum and Natural Gas (MOPNG)/Gas Authority of India (GAIL) and the Chevron-BP-Burlington joint venture group. In addition the project has been accepted as part of the International Scientific Continental Drilling Program. The Geological Survey of Canada is coordinating the science program for the project and JAPEX Canada Ltd. acted as the designated operator for the fieldwork. Primary objectives of the research program are to advance fundamental geological, geophysical and geochemical studies of the Mallik gas hydrate field and to undertake advanced production testing of a concentrated gas hydrate reservoir. Full-scale field experiments in the production well monitored the physical behavior of the hydrate deposits in response to depressurization and thermal stimulation. The observation wells facilitated cross-hole tomography and vertical seismic profile experiments (before and after production) as well as

  10. Rapid resolution of chronic shoulder pain classified as derangement using the McKenzie method: a case series

    Science.gov (United States)

    Aytona, Maria Corazon; Dudley, Karlene

    2013-01-01

    The McKenzie method, also known as Mechanical Diagnosis and Therapy (MDT), is primarily recognized as an evaluation and treatment method for the spine. However, McKenzie suggested that this method could also be applied to the extremities. Derangement is an MDT classification defined as an anatomical disturbance in the normal resting position of the joint, and McKenzie proposed that repeated movements could be applied to reduce internal joint displacement and rapidly reduce derangement symptoms. However, the current literature on MDT application to shoulder disorders is limited. Here, we present a case series involving four patients with chronic shoulder pain from a duration of 2–18 months classified as derangement and treated using MDT principles. Each patient underwent mechanical assessment and was treated with repeated movements based on their directional preference. All patients demonstrated rapid and clinically significant improvement in baseline measures and the disabilities of the arm, shoulder, and hand (QuickDASH) scores from an average of 38% at initial evaluation to 5% at discharge within 3–5 visits. Our findings suggest that MDT may be an effective treatment approach for shoulder pain. PMID:24421633

  11. Seismic modeling of multidimensional heterogeneity scales of Mallik gas hydrate reservoirs, Northwest Territories of Canada

    Science.gov (United States)

    Huang, Jun-Wei; Bellefleur, Gilles; Milkereit, Bernd

    2009-07-01

    In hydrate-bearing sediments, the velocity and attenuation of compressional and shear waves depend primarily on the spatial distribution of hydrates in the pore space of the subsurface lithologies. Recent characterizations of gas hydrate accumulations based on seismic velocity and attenuation generally assume homogeneous sedimentary layers and neglect effects from large- and small-scale heterogeneities of hydrate-bearing sediments. We present an algorithm, based on stochastic medium theory, to construct heterogeneous multivariable models that mimic heterogeneities of hydrate-bearing sediments at the level of detail provided by borehole logging data. Using this algorithm, we model some key petrophysical properties of gas hydrates within heterogeneous sediments near the Mallik well site, Northwest Territories, Canada. The modeled density, and P and S wave velocities used in combination with a modified Biot-Gassmann theory provide a first-order estimate of the in situ volume of gas hydrate near the Mallik 5L-38 borehole. Our results suggest a range of 528 to 768 × 106 m3/km2 of natural gas trapped within hydrates, nearly an order of magnitude lower than earlier estimates which did not include effects of small-scale heterogeneities. Further, the petrophysical models are combined with a 3-D finite difference modeling algorithm to study seismic attenuation due to scattering and leaky mode propagation. Simulations of a near-offset vertical seismic profile and cross-borehole numerical surveys demonstrate that attenuation of seismic energy may not be directly related to the intrinsic attenuation of hydrate-bearing sediments but, instead, may be largely attributed to scattering from small-scale heterogeneities and highly attenuate leaky mode propagation of seismic waves through larger-scale heterogeneities in sediments.

  12. A Comparison of the Effects of Pilates and McKenzie Training on Pain and General Health in Men with Chronic Low Back Pain: A Randomized Trial.

    Science.gov (United States)

    Hasanpour-Dehkordi, Ali; Dehghani, Arman; Solati, Kamal

    2017-01-01

    Today, chronic low back pain is one of the special challenges in healthcare. There is no unique approach to treat chronic low back pain. A variety of methods are used for the treatment of low back pain, but the effects of these methods have not yet been investigated adequately. The aim of this study was to compare the effects of Pilates and McKenzie training on pain and general health of men with chronic low back pain. Thirty-six patients with chronic low back pain were chosen voluntarily and assigned to three groups of 12 each: McKenzie group, Pilates group, and control group. The Pilates group participated in 1-h exercise sessions, three sessions a week for 6 weeks. McKenzie group performed workouts 1 h a day for 20 days. The control group underwent no treatment. The general health of all participants was measured by the General Health Questionnaire 28 and pain by the McGill Pain Questionnaire. After therapeutic exercises, there was no significant difference between Pilates and McKenzie groups in pain relief ( P = 0.327). Neither of the two methods was superior over the other for pain relief. However, there was a significant difference in general health indexes between Pilates and McKenzie groups. Pilates and McKenzie training reduced pain in patients with chronic low back pain, but the Pilates training was more effective to improve general health.

  13. McKenzie Classification of Extremity Lesions - An audit of primary care patients in 3 clinics

    DEFF Research Database (Denmark)

    Melbye, Martin

    2007-01-01

    Syndrome classification based on mechanical testing guides clinical decision making in conservative musculoskeletal care. The aim of this audit was to investigate how many patients presenting with problems in the extremities could be classified into the mechanical syndromes described by Robin Mc...... ranged from 4,5 to 6 years. The mechanical classification  determined by the therapists,  and was recorded on the first three visits. Mechanical classification was based on strict operational definitions. Assessment sheets were collected from each therapist, to determine their adherence...... to the operational definitions. 135 consecutive patients were included over an 18 months period and 28 patients were excluded. Of  the 107 patients with extremity joint problems, 73% were classified into one of McKenzie's mechanical syndromes by therapists trained in the McKenzie method. 34% of patients were...

  14. Overview of the 2006-2008 JOGMEC/NRCan/Aurora Mallik Gas Hydrate Production Test Program

    Science.gov (United States)

    Yamamoto, K.; Dallimore, S. R.

    2008-12-01

    During the winters of 2007 and 2008 the Japan Oil, Gas and Metals National Corporation (JOGMEC) and Natural Resources Canada (NRCan), with Aurora Research Institute as the operator, carried out an on-shore gas hydrate production test program at the Mallik site, Mackenzie Delta, Northwest Territories, Canada. The prime objective of the program was to verify the feasibility of depressurization technique by drawing down the formation pressure across a 12m perforated gas hydrate bearing section. This project was the second full scale production test at this site following the 2002 Japex/JNOC/GSC et al Mallik research program in which seven participants organizatinos from five countries undertook a thermal test using hot water circulation Field work in 2007 was devoted to establishing a production test well, installing monitoring devices outside of casing, conducting base line geophysical studies and undertaking a short test to gain practical experience prior to longer term testing planned for 2008 . Hydrate-dissociated gas was produced to surface by depressurization achieved by lowering the fluid level with a dowhole pump. However, the operation was terminated 60 hours after the start of the pumping mainly due to sand production problems. In spite of the short period (12.5 hours of ellapsed pumping time), at least 830m3 of the gas was produced and accumulated in the borehole. Sand screens were installed across the perforated interval at the bottom hole for the 2008 program to overcome operational problems encountered in 2007 and achieve sustainable gas production. Stable bottom hole flowing pressures were successfully achieved during a 6 day test with continuous pump operation. Sustained gas production was achieved with rates between 2000- 4000m3/day and cummulative gas volume in the surface of approximately 13,000m3. Temperature and pressure data measured at the bottom hole and gas and water production rates gave positive evidence for the high efficiency of gas

  15. 2016 Oregon Department of Geology and Mineral Industries (DOGAMI) Oregon Lidar DEM: McKenzie River

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Quantum Spatial collected Light Detection and Ranging (LiDAR) data for the Oregon LiDAR Consortium (OLC) McKenzie River study area. This study area is located near...

  16. Waveform tomography images of velocity and inelastic attenuation from the Mallik 2002 crosshole seismic surveys

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Hou, F. [Queen' s Univ., Kingston, ON (Canada); Bauer, K.; Weber, M. [GeoForschungsZentrum Potsdam, Potsdam (Germany)

    2005-07-01

    A time-lapse crosshole seismic survey was conducted at the Mallik field in Canada's Northwest Territories as part of the 2002 Mallik Gas Hydrate Production Research Well Program. The acquired data provided information on the distribution of the compressional-velocity and compressional-attenuation properties of the sediments. Waveform tomography extracted that information and provided subwavelength high-resolution quantitative images of the seismic velocity and attenuation from the first repeat survey, using frequencies between 100 Hz and 1000 Hz. A preprocessing flow was applied to the waveform data that includes tube-wave suppression, low-pass filtering, spatial subsampling, time-windowing, and amplitude equalization. Travel times by anisotropic velocity tomography was used to obtain the starting model for the waveform tomography. The gas-hydrate-bearing sediments were seen as laterally, continuous, high-velocity anomalies and were characterized by an increase in attenuation. The velocity images resolved individual layers as thin as a few metres. These layers could be followed across the area of interest. Slight lateral changes in velocity and in the attenuation factor were observed.

  17. A Randomized Controlled Trial Comparing the McKenzie Method to Motor Control Exercises in People With Chronic Low Back Pain and a Directional Preference.

    Science.gov (United States)

    Halliday, Mark H; Pappas, Evangelos; Hancock, Mark J; Clare, Helen A; Pinto, Rafael Z; Robertson, Gavin; Ferreira, Paulo H

    2016-07-01

    Study Design Randomized clinical trial. Background Motor control exercises are believed to improve coordination of the trunk muscles. It is unclear whether increases in trunk muscle thickness can be facilitated by approaches such as the McKenzie method. Furthermore, it is unclear which approach may have superior clinical outcomes. Objectives The primary aim was to compare the effects of the McKenzie method and motor control exercises on trunk muscle recruitment in people with chronic low back pain classified with a directional preference. The secondary aim was to conduct a between-group comparison of outcomes for pain, function, and global perceived effect. Methods Seventy people with chronic low back pain who demonstrated a directional preference using the McKenzie assessment were randomized to receive 12 treatments over 8 weeks with the McKenzie method or with motor control approaches. All outcomes were collected at baseline and at 8-week follow-up by blinded assessors. Results No significant between-group difference was found for trunk muscle thickness of the transversus abdominis (-5.8%; 95% confidence interval [CI]: -15.2%, 3.7%), obliquus internus (-0.7%; 95% CI: -6.6%, 5.2%), and obliquus externus (1.2%; 95% CI: -4.3%, 6.8%). Perceived recovery was slightly superior in the McKenzie group (-0.8; 95% CI: -1.5, -0.1) on a -5 to +5 scale. No significant between-group differences were found for pain or function (P = .99 and P = .26, respectively). Conclusion We found no significant effect of treatment group for trunk muscle thickness. Participants reported a slightly greater sense of perceived recovery with the McKenzie method than with the motor control approach. Level of Evidence Therapy, level 1b-. Registered September 7, 2011 at www.anzctr.org.au (ACTRN12611000971932). J Orthop Sports Phys Ther 2016;46(7):514-522. Epub 12 May 2016. doi:10.2519/jospt.2016.6379.

  18. Introduction of the 2007-2008 JOGMEC/NRCan/Aurora Mallik Gas Hydrate Production Research Program, NWT, Canada

    Science.gov (United States)

    Yamamoto, K.; Dallimore, S. R.; Numasawa, M.; Yasuda, M.; Fujii, T.; Fujii, K.; Wright, J.; Nixon, F.

    2007-12-01

    Japan Oil, Gas and Metals National Corporation (JOGMEC) and Natural Resource Canada (NRCan) have embarked on a new research program to study the production potential of gas hydrates. The program is being carried out at the Mallik gas hydrate field in the Mackenzie Delta, a location where two previous scientific investigations have been carried in 1998 and 2002. In the 2002 program that was undertaken by seven partners from five countries, 468m3 of gas flow was measured during 124 hours of thermal stimulation using hot warm fluid. Small-scale pressure drawdown tests were also carried out using Schlumberger's Modular Dynamics Tester (MDT) wireline tool, gas flow was observed and the inferred formation permeabilities suggested the possible effectiveness of the simple depressurization method. While the testing undertaken in 2002 can be cited as the first well constrained gas production from a gas hydrate deposit, the results fell short of that required to fully calibrate reservoir simulation models or indeed establish the technical viability of long term production from gas hydrates. The objectives of the current JOGMEC/NRCan/Aurora Mallik production research program are to undertake longer term production testing to further constrain the scientific unknowns and to demonstrate the technical feasibility of sustained gas hydrate production using the depressurization method. A key priority is to accurately measure water and gas production using state-of-art production technologies. The primary production test well was established during the 2007 field season with the re-entry and deepening of JAPEX/JNOC/GSC Mallik 2L-38 well, originally drilled in 1998. Production testing was carried out in April of 2007 under a relatively low drawdown pressure condition. Flow of methane gas was measured from a 12m perforated interval of gas-hydrate-saturated sands from 1093 to 1105m. The results establish the potential of the depressurization method and provide a basis for future

  19. Gas geochemistry studies at the gas hydrate occurrence in the permafrost environment of Mallik (NWT, Canada)

    Science.gov (United States)

    Wiersberg, T.; Erzinger, J.; Zimmer, M.; Schicks, J.; Dahms, E.; Mallik Working Group

    2003-04-01

    We present real-time mud gas monitoring data as well as results of noble gas and isotope investigations from the Mallik 2002 Production Research Well Program, an international research project on Gas Hydrates in the Northwest Territories of Canada. The program participants include 8 partners; The Geological Survey of Canada (GSC), The Japan National Oil Corporation (JNOC), GeoForschungsZentrum Potsdam (GFZ), United States Geological Survey (USGS), United States Department of the Energy (USDOE), India Ministry of Petroleum and Natural Gas (MOPNG)/Gas Authority of India (GAIL) and the Chevron-BP-Burlington joint venture group. Mud gas monitoring (extraction of gas dissolved in the drill mud followed by real-time analysis) revealed more or less complete gas depth profiles of Mallik 4L-38 and Mallik 5L-38 wells for N_2, O_2, Ar, He, CO_2, H_2, CH_4, C_2H_6, C_3H_8, C_4H10, and 222Rn; both wells are approx. 1150 m deep. Based on the molecular and and isotopic composition, hydrocarbons occurring at shallow depth (down to ˜400 m) are mostly of microbial origin. Below 400 m, the gas wetness parameter (CH_4/(C_2H_6 + C_3H_8)) and isotopes indicate mixing with thermogenic gas. Gas accumulation at the base of permafrost (˜650 m) as well as δ13C and helium isotopic data implies that the permafrost inhibits gas flux from below. Gas hydrate occurrence at Mallik is known in a depth between ˜890 m and 1100 m. The upper section of the hydrate bearing zone (890 m--920 m) consists predominantly of methane bearing gas hydrates. Between 920 m and 1050 m, concentration of C_2H_6, C_3H_8, and C_4H10 increases due to the occurrence of organic rich sediment layers. Below that interval, the gas composition is similar to the upper section of the hydrate zone. At the base of the hydrate bearing zone (˜1100 m), elevated helium and methane concentrations and their isotopic composition leads to the assumption that gas hydrates act as a barrier for gas migration from below. In mud gas

  20. A COMPARATIVE STUDY TO FIND OUT THE EFFECTIVENESS BETWEEN CORE STABILIZATION VS MCKENZIE EXERCISES IN THE TREATMENT OF PATIENTS WITH MECHANICAL LOW BACK PAIN

    Directory of Open Access Journals (Sweden)

    Abhijit Dutta

    2015-10-01

    Full Text Available Background: Mechanical Low back pain is a leading cause of disability. It occurs in similar proportions in all cultures, interferes with quality of life and work performance. Both male and female populations are affected; however, there is a tendency towards a higher incidence in male patients. Mechanical low back pain is associated with pain and clinical instability in lumbar motion segments. Exercises play an important part in the rehabilitation of low back pain. The aim of this study was to compare the effectiveness between Core stabilization vs McKenzie exercises in the treatment of patients with mechanical low back pain. Methods: 30 patients were selected between the age groups of 20 yrs to 50 yrs and having a past history of low back pain for one month. 15 patients were allotted to each group of experiment. Group I was given Core stabilization exercises and Group II with McKenzie exercises. Interferential therapy was a common treatment for both the groups. Evaluations of the subjects were done using the Revised Oswestry Disability Index and Dynamic Endurance tests. Results: Data analysis revealed statistically significant difference between both the groups (p<0.05 and proved that Core stabilization exercises is more effective than McKenzie exercises in mechanical low back pain. Conclusion: This study shows that core stabilization exercises possess a greater potential over McKenzie exercises in treating Mechanical Low back pain patients.

  1. DIAGNÓSTICO E TRATAMENTO NA DOR LOMBAR INESPECÍFICA ATRAVÉS DO MÉTODO MCKENZIE: UMA REVISÃO BIBLIOGRÁFICA

    Directory of Open Access Journals (Sweden)

    Marilia de Souza Vieira Fabre

    2017-02-01

    Full Text Available Resumo – Introdução: O método Mckenzie consiste em um programa de movimentos prescritos por fisioterapeuta, sem o auxílio de equipamentos específicos, onde o paciente aprende a identificar os movimentos, posturas e atividades que aumentam e pioram a sua dor, podendo tratá-las restaurando os mecanismos funcionais. Objetivo: Verificar as publicações na área da fisioterapia relacionadas aos benefícios do método Mckenzie no tratamento da dor lombar inespecífica. Método: Revisão bibliográfica na base de dados PubMed e Lilacs utilizando as palavras-chave: “Method Mckenzie”, “treatment”, “low back pain”. Resultados: foram encontrados 101 artigos, sendo que apenas 22 encontravam- se nos critérios de inclusão, palavra-chave, pesquisas realizadas nos ultimos 10 anos e em seres humanos com textos completo em inglês. Conclusão: O método Mckenzie apesar de ainda mostrar poucas evidências específicas, possui características próprias de autocuidado e de tratamento que agem de forma positiva na gestão da dor, mostrando à sua importância fundamental na avaliação e na classificação das disfunções.

  2. Habitat Evaluation Procedures (HEP) Report; Big Island - The McKenzie River, Technical Report 1998-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Sieglitz, Greg

    2001-03-01

    The Big Island site is located in the McKenzie River flood plain, containing remnant habitats of what was once more common in this area. A diverse array of flora and fauna, representing significant wildlife habitats, is present on the site. Stands of undisturbed forested wetlands, along with riparian shrub habitats and numerous streams and ponds, support a diversity of wildlife species, including neotropical migratory songbirds, raptors, mammals, reptiles, and amphibians (including two State-listed Sensitive Critical species). The project is located in eastern Springfield, Oregon (Figure 1). The project area encompasses 187 acres under several ownerships in Section 27 of Township 17S, Range 2W. Despite some invasion of non-native species, the site contains large areas of relatively undisturbed wildlife habitat. Over several site visits, a variety of wildlife and signs of wildlife were observed, including an active great blue heron rookery, red-Legged frog egg masses, signs of beaver, and a bald eagle, Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Bonneville Power Administration's (BPA) Mitigation and Enhancement Plan for the Willamette River Basin. Under this Plan, mitigation goals and objectives were developed as a result of the loss of wildlife habitat due to the construction of Federal hydroelectric facilities in the Willamette River Basin. Results of the Habitat Evaluation Procedures (HEP) will be used to: (1) determine the current habitat status of the study area and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area.

  3. A simple method to predict regional fish abundance: an example in the McKenzie River Basin, Oregon

    Science.gov (United States)

    D.J. McGarvey; J.M. Johnston

    2011-01-01

    Regional assessments of fisheries resources are increasingly called for, but tools with which to perform them are limited. We present a simple method that can be used to estimate regional carrying capacity and apply it to the McKenzie River Basin, Oregon. First, we use a macroecological model to predict trout densities within small, medium, and large streams in the...

  4. Gas-hydrate concentration estimated from P- and S-wave velocities at the Mallik 2L-38 research well, Mackenzie Delta, Canada

    Science.gov (United States)

    Carcione, José M.; Gei, Davide

    2004-05-01

    We estimate the concentration of gas hydrate at the Mallik 2L-38 research site using P- and S-wave velocities obtained from well logging and vertical seismic profiles (VSP). The theoretical velocities are obtained from a generalization of Gassmann's modulus to three phases (rock frame, gas hydrate and fluid). The dry-rock moduli are estimated from the log profiles, in sections where the rock is assumed to be fully saturated with water. We obtain hydrate concentrations up to 75%, average values of 37% and 21% from the VSP P- and S-wave velocities, respectively, and 60% and 57% from the sonic-log P- and S-wave velocities, respectively. The above averages are similar to estimations obtained from hydrate dissociation modeling and Archie methods. The estimations based on the P-wave velocities are more reliable than those based on the S-wave velocities.

  5. Field Tests of the Magnetotelluric Method to Detect Gas Hydrates, Mallik, Mackenzie Delta, Canada

    Science.gov (United States)

    Craven, J. A.; Roberts, B.; Bellefleur, G.; Spratt, J.; Wright, F.; Dallimore, S. R.

    2008-12-01

    The magnetotelluric method is not generally utilized at extreme latitudes due primarily to difficulties in making the good electrical contact with the ground required to measure the electric field. As such, the magnetotelluric technique has not been previously investigated to direct detect gas hydrates in on-shore permafrost environments. We present the results of preliminary field tests at Mallik, Northwest Territories, Canada, that demonstrate good quality magnetotelluric data can be obtained in this environment using specialized electrodes and buffer amplifiers similar to those utilized by Wannamaker et al (2004). This result suggests that subsurface images from larger magnetotelluric surveys will be useful to complement other techniques to detect, quantify and characterize gas hydrates.

  6. InSAR-based detection of McKenzie River Delta Permafrost loss

    Science.gov (United States)

    Oliver-Cabrera, T.; Wdowinski, S.

    2017-12-01

    Permafrost underlies most of the McKenzie River, North America's largest delta. The in the delta is catalogued as discontinuous permafrost due to the influence of shifting river channels on near-surface ground temperatures. The area is affected by climate change, studies show that ground temperature has increased by 1.5°C since 1970, due to rising annual mean air temperature. Flooding regimes within the delta are also affected by the changing climate due to melting of near surface ground ice together with sea-level rise increasing the potential of land subsidence. Observed consequences of changes occurring in the region are vegetation growth and northward migration of the tree line. The growing vegetation can affect physical properties of the accumulated snow, including depth, density and thermal conductivity. Thogether these variations affect permafrost stability. Permafrost changes can be measured throughout the impacts on river runoffs, ground water, drainages, carbon release, land subsidence and even infrastructure damages. Degradation of permafrost can also be measured by observing ecological changes in the area. In this study, we use InSAR observations to detect permafrost changes and their transition to wetland or vegetated land cover. Our data consist of four ALOS-PALSAR frames covering the entire McKenzie River Delta with temporal coverage spanning from January 2007 to March of 2011. Each frame has 20 to 24 acquisitions, in which half of the data acquired with HH polarization and the other half with HH+HV. We process the data using ROI_PAC and PYSAR software packages. Preliminary results have detected the following spatial patterns: (1) An overall good coherence of summer interferograms with 46-92 day interferograms, (2) Low coherence of winter interferograms (November to February), probably to the increase in snow coverage, (3) Phase jumps along the border of the river reflecting morphological differences between the region near to the river and other

  7. The Arctic: The Physical Environment

    Science.gov (United States)

    2010-09-01

    research well (JAPEX/JNOC/GSC Mallik 2L-38) on the north coast of the Mackenzie Delta, Northwest Territories, near the site of an existing...exploration well.134 It is estimated that that Mallik well contains 100 billion cubic meters of gas hydrates. In the spring of 2002, an expanded consortium...of Canada, Germany, Japan, and the United States began carrying out more extensive tests on the Mallik well. In the future, if these and other

  8. Holocene volcanism of the upper McKenzie River catchment, central Oregon Cascades, USA

    Science.gov (United States)

    Deligne, Natalia I.; Conrey, Richard M.; Cashman, Katharine V.; Champion, Duane E.; Amidon, William H.

    2016-01-01

    To assess the complexity of eruptive activity within mafic volcanic fields, we present a detailed geologic investigation of Holocene volcanism in the upper McKenzie River catchment in the central Oregon Cascades, United States. We focus on the Sand Mountain volcanic field, which covers 76 km2 and consists of 23 vents, associated tephra deposits, and lava fields. We find that the Sand Mountain volcanic field was active for a few decades around 3 ka and involved at least 13 eruptive units. Despite the small total volume erupted (∼1 km3 dense rock equivalent [DRE]), Sand Mountain volcanic field lava geochemistry indicates that erupted magmas were derived from at least two, and likely three, different magma sources. Single units erupted from one or more vents, and field data provide evidence of both vent migration and reoccupation. Overall, our study shows that mafic volcanism was clustered in space and time, involved both explosive and effusive behavior, and tapped several magma sources. These observations provide important insights on possible future hazards from mafic volcanism in the central Oregon Cascades.

  9. In situ thermal conductivity of gas-hydrate-bearing sediments of the Mallik 5L-38 well

    Science.gov (United States)

    Henninges, J.; Huenges, E.; Burkhardt, H.

    2005-11-01

    Detailed knowledge about thermal properties of rocks containing gas hydrate is required in order to quantify processes involving gas hydrate formation and decomposition in nature. In the framework of the Mallik 2002 program, three wells penetrating a continental gas hydrate occurrence under permafrost were successfully equipped with permanent fiber-optic distributed temperature sensing cables. Temperature data were collected over a 21-month period after completing the wells. Thermal conductivity profiles were calculated from the geothermal data as well as from a petrophysical model derived from the available logging data and application of mixing law models. Results indicate that thermal conductivity variations are mainly lithologically controlled with a minor influence from hydrate saturation. Average thermal conductivity values of the hydrate-bearing sediments range between 2.35 and 2.77 W m-1 K-1. Maximum gas hydrate saturations can reach up to about 90% at an average porosity of 0.3.

  10. Effectiveness of McKenzie Method-Based Self-Management Approach for the Secondary Prevention of a Recurrence of Low Back Pain (SAFE Trial): Protocol for a Pragmatic Randomized Controlled Trial.

    Science.gov (United States)

    de Campos, Tarcisio F; Maher, Chris G; Clare, Helen A; da Silva, Tatiane M; Hancock, Mark J

    2017-08-01

    Although many people recover quickly from an episode of low back pain (LBP), recurrence is very common. There is limited evidence on effective prevention strategies for recurrences of LBP. The purpose of this study was to determine the effectiveness of a McKenzie method-based self-management approach in the secondary prevention of LBP. This will be a pragmatic randomized controlled trial. Participants will be recruited from the community and primary care, with the intervention delivered in a number of physical therapist practices in Sydney, Australia. The study will have 396 participants, all of whom are at least 18 years old. Participants will be randomly assigned to either the McKenzie method-based self-management approach group or a minimal intervention control group. The primary outcome will be days to first self-reported recurrence of an episode of activity-limiting LBP. The secondary outcomes will include: days to first self-reported recurrence of an episode of LBP, days to first self-reported recurrence of an episode of LBP leading to care seeking, and the impact of LBP over a 12-month period. All participants will be followed up monthly for a minimum of 12 months or until they have a recurrence of activity-limiting LBP. All participants will also be followed-up at 3, 6, 9, and 12 months to assess the impact of back pain, physical activity levels, study program adherence, credibility, and adverse events. Participants and therapists will not be masked to the interventions. To our knowledge, this will be the first large, high-quality randomized controlled trial investigating the effectiveness of a McKenzie method-based self-management approach for preventing recurrences of LBP. If this approach is found to be effective, it will offer a low-cost, simple method for reducing the personal and societal burdens of LBP. © 2017 American Physical Therapy Association

  11. The effects of cervical traction, cranial rhythmic impulse, and Mckenzie exercise on headache and cervical muscle stiffness in episodic tension-type headache patients.

    Science.gov (United States)

    Choi, Sung-Yong; Choi, Jung-Hyun

    2016-03-01

    [Purpose] The purpose of this study was to examine the effects of cervical traction treatment, cranial rhythmic impulse treatment, a manual therapy, and McKenzie exercise, a dynamic strengthening exercise, on patients who have the neck muscle stiffness of the infrequent episodic tension-type (IETTH) headache and frequent episodic tension-type headache(FETTH), as well as to provide the basic materials for clinical interventions. [Subjects] Twenty-seven subjects (males: 15, females: 12) who were diagnosed with IETTH and FETTH after treatment by a neurologist were divided into three groups: (a cervical traction group (CTG, n=9), a cranial rhythmic contractiongroup (CRIG, n=9), and a McKenzie exercise group (MEG, n=9). An intervention was conducted for each group and the differences in their degrees of neck pain and changes in muscle tone were observed. [Results] In the within-group comparison of each group, headache significantly decreased in CTG. According to the results of the analysis of the muscle tone of the upper trapezius, there was a statistically significant difference in MEG on the right side and in CRIG on the left side. According to the results of the analysis of the muscle tone of the sternocleidomastoid muscle, there was a statistically significant difference in MEG on the right side and in CRIG on the left side. [Conclusion] In the comparison of the splenius capitis muscle between the groups, there was a statistically significant difference on the right side. Hence, compared to the other methods, cervical traction is concluded to be more effective at reducing headaches in IETTH and FETTH patients.

  12. Remagnetization and Cementation of Unconsolidated Sediments in the Mallik 5L-38 Well (Canadian Arctic) by Solute Exclusion During Gas Hydrate Formation

    Science.gov (United States)

    Hamilton, T. S.; Enkin, R. J.; Esteban, L.

    2007-05-01

    Bulk magnetic properties provide a sensitive measure of sedimentary diagenesis related to the stability and growth of gas hydrates. The deposit at Mallik (Mackenzie Delta, Canadian Arctic) occurs in unconsolidated Tertiary sands, but is absent in interstratified silt layers. A detailed sampling of the JAPEX/JNOC/GSC Mallik 5L-38 core tested the use of magnetic properties for detecting diagenetic changes related to the hydrate. Petrographic studies reveal that the sands are well sorted and clean, with quartz > chert >> muscovite and little fines content. Excepting a few rare bands of indurated dolomite in the midst of the gas hydrate zone, there is little or no cementation in the sands. Detrital magnetite is the dominant magnetic mineral, comprising up to a few percent of the sand grain population. In contrast, the muddier layers have a somewhat different detrital grain composition, richer in lithic (sedimentary and metamorphic) grains, feldspar, and clays. They are extensively diagenetically altered (to as much as 30- 40%) and cemented with carbonates, clays, chlorite and the iron sulphide greigite (the dominant magnetic mineral). The greigite is recognized by its isotropic creamy-white reflectance, cubic to prismatic habit, and characteristic tarnish to faintly bluish bireflectant mackinawite. Habits range from disseminated cubes and colliform masses to inflationary massive sulphide veins and clots. Rare detrital grains of magnetite were observed among the silt grains, but never in a reaction relationship or overgrown. Instead the greigite has nucleated separately, in tensional fractures and granular masses up to 4 mm across. In this particular sediment sequence, being so quartz and chert rich, there is insufficient local source for the introduced cements (calcite, dolomite, greigite, clays, jarosite), so ions must have been introduced by fluid flow. Magnetic studies reveal a bi-modal character related to the lithology (sands versus silts) and their magnetic

  13. A Comparison of the Effects of Pilates and McKenzie Training on Pain and General Health in Men with Chronic Low Back Pain: A Randomized Trial

    OpenAIRE

    Hasanpour-Dehkordi, Ali; Dehghani, Arman; Solati, Kamal

    2017-01-01

    Background: Today, chronic low back pain is one of the special challenges in healthcare. There is no unique approach to treat chronic low back pain. A variety of methods are used for the treatment of low back pain, but the effects of these methods have not yet been investigated adequately. Aim: The aim of this study was to compare the effects of Pilates and McKenzie training on pain and general health of men with chronic low back pain. Materials and Methods: Thirty-six patients with chronic l...

  14. Vertical seismic profile data from well Mallik 2L-38 for gas hydrate studies

    Energy Technology Data Exchange (ETDEWEB)

    Mi, Y [Calgary Univ., AB (Canada); Walia, R [Victoria Univ., BC (Canada); Hyndman, R D; Sakai, A

    1999-01-01

    A gas hydrate research well was drilled in the Canadian Arctic to determine gas hydrates in a permafrost setting in a collaborative research project between the Japan National Oil Corp., and the Geological Survey of Canada with the participation of other agencies. The multidisciplinary study included an electromagnetic survey, permafrost and gas hydrate coring, and comprehensive downhole geophysical logging and measurement. Laboratory studies on recovered cores and cuttings included sedimentology, physical properties, geochemistry, and reservoir characteristics of the Mallik gas accumulation. As part of the field program, a vertical seismic profiling survey was conducted at zero and offset source positions with 3 component receiver tools and horizontal and vertical vibration sources. A special effort was made to record shear wave data, and results from this work were combined with down hole logs and regional surface seismic data. The data will be used also to determine the effect of gas hydrates on formation velocities and to measure gas hydrate concentrations as a function of depth in the formation penetrated by the well. Certain conclusions followed from the initial VSP analysis. 1) Zero offset vertical vibration Z component and horizontal X component data give reliable velocity estimation within the gas hydrate formation zone, and P wave velocities from offset data indicate excellent consistency with that from zero offset data and with the sonic log. 2) The VSP data permitted reliable identification of gas hydrate bearing zones. 4 refs.

  15. Characterization of the Paleoenvironmental Evolution of the Mallik Area From Gas Geochemistry Data

    Science.gov (United States)

    Wiersberg, T.; Erzinger, J.

    2007-12-01

    During drilling of the JAPEX/JNOC/GCS et al. Mallik Gas Hydrate Production Research wells (NWT, Canada), up to 35 vol-% CH4 were found in drill mud gas at 106 m depth within the permafrost. The carbon isotope composition of CH4 implies that this gas is of microbial origin (δ13C from -75‰ to - 77‰ PDB). Surprisingly, noble gas data suggest that at least some of this gas could be trapped in gas hydrates, at a depth distinctly shallower than the predicted gas hydrate stability field. Although microbes are capable of some metabolic activities at subzero temperatures, it is unlikely that production of methane under permafrost conditions can account for that amount of natural gas at this depth. Therefore, we suggest that the formation of this gas must have occurred under non-permafrost conditions. Furthermore, this gas reservoir was sealed from mixing with thermogenic gas, migrating from depth, which could be identified at the base of the permafrost at approx. 620m depth (δ13C=-42.5‰). We interpret the observed features by partially thawing of existing permafrost at least down to 106 m depth during a period of warming where the area was covered by a lake or by the ocean through inundation of the shoreline. Once the lake was drained or the shoreline was uplifted, the surface became again exposed to air and permafrost again developed on top of the unfrozen ground. As the permafrost gradually advanced downward, the water below was pressurized due to freezing and expansion of the newly formed ice, leading to pressure conditions that stabilize gas hydrates.

  16. Anthropocene Knowledge Practices in McKenzie Wark’s Molecular Red and Kim Stanley Robinson’s Aurora

    Directory of Open Access Journals (Sweden)

    Gib Prettyman

    2018-02-01

    Full Text Available Through a close reading of McKenzie Wark’s theoretical treatise 'Molecular Red' (2015 and Kim Stanley Robinson’s novel 'Aurora' (2015, this essay examines how Anthropocene knowledge practices challenge our conceptions of human agency in provocative and potentially productive ways. For example, our knowledge of climate science arises through global material infrastructures. As material components of Anthropocene knowledge practices, these infrastructures reveal the material labors and cyborg structures by means of which our knowledge is produced. Wark sees the heterogenous materiality of Anthropocene knowledge practices as evidence for the value of ‘low theories’ based on a ‘labor point of view.’ At the same time, Anthropocene knowledge practices reveal ‘eco-logical’ complexities and fundamental recognitions of the ‘intra-action’ of entangled matter. These complexities produce very estranged views of human agency. Robinson’s novel highlights the eco-logical implications of contemporary knowledge practices by imagining an interstellar ship that must function as a completely artificial ecosystem for a 170-year voyage to another solar system. The significance of knowledge practices and eco-logical complexity is most evident when failures or crises arise, and 'Aurora' tells the story of many such failures. However, I argue that Robinson’s novel and Wark’s ‘low theory’ ultimately function as hopeful accounts of Anthropocene knowledge practices. Among other things, these practices show the material importance of storytelling and point the way toward more complexly realist theories of human agency.

  17. Properties of samples containing natural gas hydrate from the JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well, determined using Gas Hydrate And Sediment Test Laboratory Instrument (GHASTLI)

    Science.gov (United States)

    Winters, W.J.

    1999-01-01

    As part of an ongoing laboratory study, preliminary acoustic, strength, and hydraulic conductivity results are presented from a suite of tests conducted on four natural-gas-hydrate-containing samples from the Mackenzie Delta JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well. The gas hydrate samples were preserved in pressure vessels during transport from the Northwest Territories to Woods Hole, Massachusetts, where multistep tests were performed using GHASTLI (Gas Hydrate And Sediment Test Laboratory Instrument), which recreates pressure and temperature conditions that are stable for gas hydrate. Properties and changes in sediment behaviour were measured before, during, and after controlled gas hydrate dissociation. Significant amounts of gas hydrate occupied the sample pores and substantially increased acoustic velocity and shear strength.

  18. Analyses of production tests and MDT tests conducted in Mallik and Alaska methane hydrate reservoirs : what can we learn from these well tests?

    Energy Technology Data Exchange (ETDEWEB)

    Kurihara, M.; Funatsu, K.; Ouchi, H. [Japan Oil Engineering Co., Tokyo (Japan); Masuda, Y. [Tokyo Univ., Tokyo (Japan). School of Engineering; Yamamoto, K. [Japan Oil, Gas and Metals National Corp., Tokyo (Japan); Narita, H. [National Inst. of Advanced Industrial Science and Technology, Tokyo (Japan); Dallimore, S.R. [Natural Resources Canada, Ottawa, ON (Canada). Geological Survey of Canada; Collett, T.S. [United States Geological Survey, Reston, VA (United States); Hancock, S.H. [APA Petroleum Engineering Ltd., Calgary, AB (Canada)

    2008-07-01

    This paper described a series of pressure drawdown tests conducted to evaluate a modular formation dynamics tester (MDT) wireline tool. The tests were conducted at the Mallik methane hydrate (MH) reservoir as well as in MH reservoirs in Alaska over a period of several years. Production tests were also conducted to evaluate depressurization methods, and measure production and bottomhole pressure (BHP) below known MH stability pressures in order to estimate permeability and MH dissociation radius properties. The results of the tests were then history-matched using a numerical simulator. An analysis of the simulation study showed that the MDT tests were useful in estimating initial effective permeability levels in the presence of MH. However, wellbore storage erased important data used to indicate the radius of MH dissociation and effective permeability after partial MH dissociation. The study also showed that steady flow conditions must be established before obtaining solutions from history-matched production tests. Parameters accurately estimated using the MDT and production tests were outlined, and suggestions for future designs and analyses for MH reservoirs were presented. 14 refs., 7 tabs., 17 figs.

  19. Amount of gas hydrate estimated from compressional- and shear-wave velocities at the JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well

    Science.gov (United States)

    Lee, M.W.

    1999-01-01

    The amount of in situ gas hydrate concentrated in the sediment pore space at the JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well was estimated by using compressional-wave (P-wave) and shear-wave (S-wave) downhole log measurements. A weighted equation developed for relating the amount of gas hydrate concentrated in the pore space of unconsolidated sediments to the increase of seismic velocities was applied to the acoustic logs with porosities derived from the formation density log. A weight of 1.56 (W=1.56) and the exponent of 1 (n=1) provided consistent estimates of gas hydrate concentration from the S-wave and the P-wave logs. Gas hydrate concentration is as much as 80% in the pore spaces, and the average gas hydrate concentration within the gas-hydrate-bearing section from 897 m to 1110 m (excluding zones where there is no gas hydrate) was calculated at 39.0% when using P-wave data and 37.8% when using S-wave data.

  20. Gas composition and isotopic geochemistry of cuttings, core, and gas hydrate from the JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well

    Science.gov (United States)

    Lorenson, T.D.

    1999-01-01

    Molecular and isotopic composition of gases from the JAPEX/JNOC/GSC Mallik 2L-38 gas hydrate research well demonstrate that the in situ gases can be divided into three zones composed of mixtures of microbial and thermogenic gases. Sediments penetrated by the well are thermally immature; thus the sediments are probably not a source of thermogenic gas. Thermogenic gas likely migrated from depths below 5000 m. Higher concentrations of gas within and beneath the gas hydrate zone suggest that gas hydrate is a partial barrier to gas migration. Gas hydrate accumulations occur wholly within zone 3, below the base of permafrost. The gas in gas hydrate resembles, in part, the thermogenic gas in surrounding sediments and gas desorbed from lignite. Gas hydrate composition implies that the primary gas hydrate form is Structure I. However, Structure II stabilizing gases are more concentrated and isotopically partitioned in gas hydrate relative to the sediment hosting the gas hydrate, implying that Structure II gas hydrate may be present in small quantities.

  1. The McKenzie method compared with manipulation when used adjunctive to information and advice in low back pain patients presenting with centralization or peripheralization. A randomized controlled trial

    DEFF Research Database (Denmark)

    Petersen, Tom; Larsen, Kristian; Nordsteen, Jan

    2011-01-01

    .Methods. A total of 350 patients suffering from low back pain with a duration of more than 6 weeks who presented with centralization or peripheralization of symptoms with or without signs of nerve root involvement, were enrolled in the trial. Main outcome was number of patients with treatment success defined...... a structured exercise programme tailored to the individual patient as well as manual therapy for the treatment of persistent low back pain. There is presently insufficient evidence to recommend the use of specific decision methods tailoring specific therapies to clinical subgroups of patients in primary care...... for more than six weeks presenting with centralization or peripheralization of symptoms, we found the McKenzie method to be slightly more effective than manipulation when used adjunctive to information and advice....

  2. Numerical modeling of the simulated gas hydrate production test at Mallik 2L-38 in the pilot scale pressure reservoir LARS - Applying the "foamy oil" model

    Science.gov (United States)

    Abendroth, Sven; Thaler, Jan; Klump, Jens; Schicks, Judith; Uddin, Mafiz

    2014-05-01

    In the context of the German joint project SUGAR (Submarine Gas Hydrate Reservoirs: exploration, extraction and transport) we conducted a series of experiments in the LArge Reservoir Simulator (LARS) at the German Research Centre of Geosciences Potsdam. These experiments allow us to investigate the formation and dissociation of hydrates at large scale laboratory conditions. We performed an experiment similar to the field-test conditions of the production test in the Mallik gas hydrate field (Mallik 2L-38) in the Beaufort Mackenzie Delta of the Canadian Arctic. The aim of this experiment was to study the transport behavior of fluids in gas hydrate reservoirs during depressurization (see also Heeschen et al. and Priegnitz et al., this volume). The experimental results from LARS are used to provide details about processes inside the pressure vessel, to validate the models through history matching, and to feed back into the design of future experiments. In experiments in LARS the amount of methane produced from gas hydrates was much lower than expected. Previously published models predict a methane production rate higher than the one observed in experiments and field studies (Uddin et al. 2010; Wright et al. 2011). The authors of the aforementioned studies point out that the current modeling approach overestimates the gas production rate when modeling gas production by depressurization. They suggest that trapping of gas bubbles inside the porous medium is responsible for the reduced gas production rate. They point out that this behavior of multi-phase flow is not well explained by a "residual oil" model, but rather resembles a "foamy oil" model. Our study applies Uddin's (2010) "foamy oil" model and combines it with history matches of our experiments in LARS. Our results indicate a better agreement between experimental and model results when using the "foamy oil" model instead of conventional models of gas flow in water. References Uddin M., Wright J.F. and Coombe D

  3. Using open hole and cased-hole resistivity logs to monitor gas hydrate dissociation during a thermal test in the mallik 5L-38 research well, Mackenzie Delta, Canada

    Science.gov (United States)

    Anderson, B.I.; Collett, T.S.; Lewis, R.E.; Dubourg, I.

    2008-01-01

    Gas hydrates, which are naturally occurring ice-like combinations of gas and water, have the potential to provide vast amounts of natural gas from the world's oceans and polar regions. However, producing gas economically from hydrates entails major technical challenges. Proposed recovery methods such as dissociating or melting gas hydrates by heating or depressurization are currently being tested. One such test was conducted in northern Canada by the partners in the Mallik 2002 Gas Hydrate Production Research Well Program. This paper describes how resistivity logs were used to determine the size of the annular region of gas hydrate dissociation that occurred around the wellbore during the thermal test in the Mallik 5L-38 well. An open-hole logging suite, run prior to the thermal test, included array induction, array laterolog, nuclear magnetic resonance and 1.1-GHz electromagnetic propagation logs. The reservoir saturation tool was run both before and after the thermal test to monitor formation changes. A cased-hole formation resistivity log was run after the test.Baseline resistivity values in each formation layer (Rt) were established from the deep laterolog data. The resistivity in the region of gas hydrate dissociation near the wellbore (Rxo) was determined from electromagnetic propagation and reservoir saturation tool measurements. The radius of hydrate dissociation as a function of depth was then determined by means of iterative forward modeling of cased-hole formation resistivity tool response. The solution was obtained by varying the modeled dissociation radius until the modeled log overlaid the field log. Pretest gas hydrate production computer simulations had predicted that dissociation would take place at a uniform radius over the 13-ft test interval. However, the post-test resistivity modeling showed that this was not the case. The resistivity-derived dissociation radius was greatest near the outlet of the pipe that circulated hot water in the wellbore

  4. Seismic Characterization and Continuity Analysis of Gas Hydrate Horizons Near the Mallik Research Wells, Mackenzie Delta, Canada

    Science.gov (United States)

    Bellefleur, G.; Riedel, M.; Brent, T.

    2005-12-01

    Gas hydrate deposits in arctic environment generally lack the BSR signature diagnostic of their presence in marine seismic data. The absence of the BSR signature complicates the estimation of the resources within or below the permafrost and the determination of their potential impact on future energy supplies, geohazard and climate change. We present results from a detailed seismic characterization of three gas hydrate horizons (A, B and C) intersected below the permafrost in five wells of the Mallik gas hydrate field located in the Mackenzie delta (Northwest Territories, Canada). The detailed seismic characterization included attribute analyses, synthetic modeling and acoustic impedance inversion and allowed estimation of the lateral continuity of the three horizons in the vicinity of the wells. Vertical Seismic Profiling (VSP) data, 3D and 2D industry seismic data and the 5L/2L-38 geophysical logs (density, P-wave sonic velocity) were used for this study. Synthetic modeling using the sonic and density logs reveals that the base of the lower gas hydrate horizons B and C can be identified on the industry 3D and 2D seismic sections as prominent isolated reflections. The uppermost gas hydrate occurrence (horizon A) and potentially other additional smaller-scale layers are identified only on the higher-resolution VSP data. The 3D industry seismic data set processed to preserve the relative true-amplitudes was used for attribute calculations and acoustic impedance inversion. The attribute maps defined areas of continuous reflectivity for horizons B and C and structural features disrupting them. Results from impedance inversion indicate that such continuous reflectivity around the wells is most likely attributable to gas hydrates. The middle gas hydrate occurrence (horizon B) covers an area of approximately 25 000m2. Horizon C, which marks the base of gas hydrate occurrence zone, extends over a larger area of approximately 120 000m2.

  5. Geomechanical response of permafrost-associated hydrate deposits to depressurization-induced gas production

    Science.gov (United States)

    Rutqvist, J.; Moridis, G.J.; Grover, T.; Collett, T.

    2009-01-01

    In this simulation study, we analyzed the geomechanical response during depressurization production from two known hydrate-bearing permafrost deposits: the Mallik (Northwest Territories, Canada) deposit and Mount Elbert (Alaska, USA) deposit. Gas was produced from these deposits at constant pressure using horizontal wells placed at the top of a hydrate layer (HL), located at a depth of about 900??m at the Mallik site and 600??m at the Mount Elbert site. The simulation results show that general thermodynamic and geomechanical responses are similar for the two sites, but with substantially higher production and more intensive geomechanical responses at the deeper Mallik deposit. The depressurization-induced dissociation begins at the well bore and then spreads laterally, mainly along the top of the HL. The depressurization results in an increased shear stress within the body of the receding hydrate and causes a vertical compaction of the reservoir. However, its effects are partially mitigated by the relatively stiff permafrost overburden, and compaction of the HL is limited to less than 0.4%. The increased shear stress may lead to shear failure in the hydrate-free zone bounded by the HL overburden and the downward-receding upper dissociation interface. This zone undergoes complete hydrate dissociation, and the cohesive strength of the sediment is low. We determined that the likelihood of shear failure depends on the initial stress state as well as on the geomechanical properties of the reservoir. The Poisson's ratio of the hydrate-bearing formation is a particularly important parameter that determines whether the evolution of the reservoir stresses will increase or decrease the likelihood of shear failure.

  6. Preliminary assessment of the waveform inversion method for interpretation of cross-well seismic data from the thermal production test, JAPEX/JNOC/GSC et al. Mallik 5L-38 gas hydrate production research well

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, T. [Nagoya Univ., Nagoya (Japan). Research Center for Seismology and Volcanology; Shimizu, S. [Japan National Oil Co., Chiba (Japan); Asakawa, E. [JGI Inc., Tokyo (Japan); Kamei, R.; Matsuoka, T. [Kyoto Univ., Kyoto (Japan). Dept. of Civil and Earth Resources Engineering

    2005-07-01

    The JAPEX/JNOC/GSC et al. Mallik 3L-38 and 4L-38 test wells were subjected to repeated cross-well seismic surveys before and during the gas production test from the gas-hydrate-bearing layer at a depth of about 905 to 920 m. High-resolution velocity images in the gas-hydrate-bearing layer were obtained using the frequency-domain nonlinear waveform inversion method. An acoustic waveform inversion method was used along with the frequency-domain approach in order to detect the change in acoustic properties of the gas-hydrate-bearing layer resulting from gas production. The layered structures with small lateral heterogeneities were reconstructed by tomography analysis of preprocessed waveform data using a smaller number of source-receiver pairs. Preliminary results reveal high velocity and very high attenuation in the gas-hydrate-bearing layers. No obvious velocity decreases were noted. Information for further detailed processing was also gathered.

  7. Gas Hydrates | Alaska Division of Geological & Geophysical Surveys

    Science.gov (United States)

    Preliminary Report - Cascadia Margin Gas Hydrates, Volume 204 Initial Report Mallik 2002 GSC Bulletin 585 : Scientific results from the Mallik 2002 gas hydrate production well program Offshore gas hydrate sample

  8. The Inverse of Banded Matrices

    Science.gov (United States)

    2013-01-01

    indexed entries all zeros. In this paper, generalizing a method of Mallik (1999) [5], we give the LU factorization and the inverse of the matrix Br,n (if it...r ≤ i ≤ r, 1 ≤ j ≤ r, with the remaining un-indexed entries all zeros. In this paper generalizing a method of Mallik (1999) [5...matrices and applications to piecewise cubic approximation, J. Comput. Appl. Math. 8 (4) (1982) 285–288. [5] R.K. Mallik , The inverse of a lower

  9. 76 FR 39438 - Solicitation for a Cooperative Agreement-Evaluating Early Access to Medicaid as a Reentry Strategy

    Science.gov (United States)

    2011-07-06

    ... substance use, all of which have been shown to contribute to decreased recidivism. (K. Mallik-Kane and C... Francisco County Jail.'' American Journal of Public Health, 98 (12): 2182-84.; K. Mallik-Kane and C. A...

  10. Bioremediation Approaches for Treating Low Concentrations of N-Nitrosodimethylamine in Groundwater

    Science.gov (United States)

    2008-10-01

    Tate and Alexander, 1975, 1976; Mallik and Tesfai, 1981). The persistence of NDMA derived originally from 1,1-dimethylhydrazine- based rocket fuel over...metabolism: Organic carbon oxidation coupled to dissimilatory reduction of iron or manganese. Appl. Environ. Microbiol. 54:1472-1480. Mallik , M

  11. Abiotic and Biotic Mechanisms Controlling In Situ Remediation of NDMA

    Science.gov (United States)

    2009-05-01

    1985; Mitch et al. 2003) and soil microcosms ( Mallik and Testai 1981). These results were confirmed in our laboratory (WES) using 14C-NDMA (Figure...9- Fluorenylmethylchloroformate.” Journal of Chromatography 721(2):231–239. Mallik MA and K Testai. 1981. “Transformation of Nitrosamines in Soil

  12. Fault system and thermal regime in the vicinity of site NGHP-01-10, Krishna-Godavari basin, Bay of Bengal

    Digital Repository Service at National Institute of Oceanography (India)

    Dewangan, P.; Srirama, G.; Ramprasad, T.; Ramana, M.V.; Jaiswal, P.

    driven (Milkov and Sassen, 2002). In structural accumulation gases are transported to the GHSZ through features such as faults and mud 3 volcanoes, e.g. northwestern Gulf of Mexico (Brooks et al., 1986; MacDonald et al., 1994; Milkov and Sassen, 2000... horizons, e.g., Blake ridge (Xu and Ruppel, 1999; Dickens et al., 1997), Gulf of Mexico minibasins (Milkov and Sassen, 2001; Pflaum et al., 1986), Nankai trough (Matsumoto et al., 2001), and Mallik (Dallimore et al., 1999). A combination of both...

  13. Collaborative Center in Polymer Photonics

    Science.gov (United States)

    2009-02-28

    2008). FA9550-05-1-0471 19 Final Report September 1, 2005 - February 28, 2009 S. F. Lyuksyutov (In collaboration with Prof. Dr. R. R. Mallik ...Technology 18 (5), August 4, 2008 3. E. Rowicka, D. Kashyn, M. A. Reagan, I. Dolog, P. B. Paramonov, R. R. Mallik , and S. F. Lvuksyutov "Influence of

  14. Sedimentological Properties of Natural Gas Hydrates-Bearing Sands in the Nankai Trough and Mallik Areas

    Science.gov (United States)

    Uchida, T.; Tsuji, T.; Waseda, A.

    2009-12-01

    The Nankai Trough parallels the Japanese Island, where extensive BSRs have been interpreted from seismic reflection records. High resolution seismic surveys have definitely indicated gas hydrate distributions, and drilling the MITI Nankai Trough wells in 2000 and the METI Tokai-oki to Kumano-nada wells in 2004 have revealed subsurface gas hydrate in the eastern part of Nankai Trough. In 1998 and 2002 Mallik wells were drilled at Mackenzie Delta in the Canadian Arctic that also clarified the characteristics of gas hydrate-dominant sandy layers at depths from 890 to 1110 m beneath the permafrost zone. During the field operations, the LWD and wire-line well log data were continuously obtained and plenty of gas hydrate-bearing sand cores were recovered. Subsequence sedimentological and geochemical analyses performed on those core samples revealed the crucial geologic controls on the formation and preservation of natural gas hydrate in sediments. Pore-space gas hydrates reside in sandy sediments mostly filling intergranular porosity. Pore waters chloride anomalies, core temperature depression and core observations on visible gas hydrates confirm the presence of pore-space gas hydrates within moderate to thick sandy layers, typically 10 cm to a meter thick. Sediment porosities and pore-size distributions were obtained by mercury porosimetry, which indicate that porosities of gas hydrate-bearing sandy strata are approximately 45 %. According to grain size distribution curves, gas hydrate is dominant in fine- to very fine-grained sandy strata. Gas hydrate saturations are typically up to 80 % in pore volume throughout most of the hydrate-dominant sandy layers, which are estimated by well log analyses as well as pore water chloride anomalies. It is necessary for investigating subsurface fluid flow behaviors to evaluate both porosity and permeability of gas hydrate-bearing sandy sediments, and the measurements of water permeability for them indicated that highly saturated

  15. QDR 2001: Strategy-Driven Choices for America’s Security

    Science.gov (United States)

    2001-04-01

    McKenzie, Jr., USMC; Lieutenant Colonel Philip M. Ruhlman , USAF; Lieutenant Colonel John J. Spinelli, USA; and Captain Sam J. Tangredi, USN. Their...one chosen by their service: Lieutenant Colonel Frank McKenzie, USMC; Lieutenant Colonel Philip Ruhlman , USAF; Lieutenant Colonel John Spinelli, USA

  16. Diatom community response to climate variability over the past 37,000 years in the sub-tropics of the Southern Hemisphere

    Energy Technology Data Exchange (ETDEWEB)

    Hembrow, Sarah C., E-mail: sarah.hembrow@scu.edu.au [School of Environment, Science and Engineering, Southern Cross University, Lismore, NSW 2480 (Australia); Taffs, Kathryn H. [School of Environment, Science and Engineering, Southern Cross University, Lismore, NSW 2480 (Australia); Atahan, Pia [Institute for Environmental Research, Australian Nuclear Science and Technology Organisation, Kirrawee, NSW 2232 (Australia); Parr, Jeff [School of Environment, Science and Engineering, Southern Cross University, Lismore, NSW 2480 (Australia); Zawadzki, Atun; Heijnis, Henk [Institute for Environmental Research, Australian Nuclear Science and Technology Organisation, Kirrawee, NSW 2232 (Australia)

    2014-01-01

    Climate change is impacting global surface water resources, increasing the need for a deeper understanding of the interaction between climate and biological diversity. This is particularly the case in the Southern Hemisphere sub-tropics, where little information exists on the aquatic biota response to climate variations. Palaeolimnological techniques, in particular the use of diatoms, are well established and can significantly contribute to the understanding of climatic variability and the impacts that change in climate have on aquatic ecosystems. A sediment core from Lake McKenzie, Fraser Island (Australia), was used to investigate interactions between climate influences and aquatic ecosystems. This study utilises a combination of proxies including biological (diatom), geochemical and chronological techniques to investigate long-term aquatic changes within the perched-dune lake. A combination of {sup 210}Pb and AMS {sup 14}C dates showed that the retrieved sediment represented a history of ca. 37,000 cal. yBP. The sedimentation rate in Lake McKenzie is very low, ranging on average from 0.11 mm to 0.26 mm per year. A sediment hiatus was observed between ca. 18,300 and 14,000 cal. yBP suggesting a period of dry conditions at the site. The diatom record shows little variability over the period of record, with benthic, freshwater acidic tolerant species dominating. Relative abundance of planktonic species and geochemical results indicates a period of increased water depth and lake productivity in the early Holocene and a gradual decrease in effective precipitation throughout the Holocene. Results from this study not only support earlier work conducted on Fraser Island using pollen reconstructions but also demonstrate that diatom community diversity has been relatively consistent throughout the Holocene and late Pleistocene with only minor cyclical fluctuation evident. This record is consistent with the few other aquatic palaeoecological records from the Southern

  17. Diatom community response to climate variability over the past 37,000 years in the sub-tropics of the Southern Hemisphere

    International Nuclear Information System (INIS)

    Hembrow, Sarah C.; Taffs, Kathryn H.; Atahan, Pia; Parr, Jeff; Zawadzki, Atun; Heijnis, Henk

    2014-01-01

    Climate change is impacting global surface water resources, increasing the need for a deeper understanding of the interaction between climate and biological diversity. This is particularly the case in the Southern Hemisphere sub-tropics, where little information exists on the aquatic biota response to climate variations. Palaeolimnological techniques, in particular the use of diatoms, are well established and can significantly contribute to the understanding of climatic variability and the impacts that change in climate have on aquatic ecosystems. A sediment core from Lake McKenzie, Fraser Island (Australia), was used to investigate interactions between climate influences and aquatic ecosystems. This study utilises a combination of proxies including biological (diatom), geochemical and chronological techniques to investigate long-term aquatic changes within the perched-dune lake. A combination of 210 Pb and AMS 14 C dates showed that the retrieved sediment represented a history of ca. 37,000 cal. yBP. The sedimentation rate in Lake McKenzie is very low, ranging on average from 0.11 mm to 0.26 mm per year. A sediment hiatus was observed between ca. 18,300 and 14,000 cal. yBP suggesting a period of dry conditions at the site. The diatom record shows little variability over the period of record, with benthic, freshwater acidic tolerant species dominating. Relative abundance of planktonic species and geochemical results indicates a period of increased water depth and lake productivity in the early Holocene and a gradual decrease in effective precipitation throughout the Holocene. Results from this study not only support earlier work conducted on Fraser Island using pollen reconstructions but also demonstrate that diatom community diversity has been relatively consistent throughout the Holocene and late Pleistocene with only minor cyclical fluctuation evident. This record is consistent with the few other aquatic palaeoecological records from the Southern Hemisphere sub

  18. The Molecular Epidemiology of Malaria in Western Kenya

    Science.gov (United States)

    2002-09-01

    transcriptional activation. Proc Natl Acad Sci USA 1997 94(7): 3195-9. 27. Uglialoro AM, Turbay D, Pesavento PA, Delgado JC, McKenzie FE, Gribben JG, Hartl D...Uglialoro AM, Turbay D, Pesavento PA, Delgado JC, McKenzie FE, Gribben JG, Hartl D, Yunis EJ, Goldfeld AE. Identification of three new single nucleotide

  19. Mallik, Prof. Roop

    Indian Academy of Sciences (India)

    Ethical Guidelines and Procedures document. Posted on 17 January 2017. A revised version of the document 'Scientific Values: Ethical Guidelines and Procedures' has been produced by the Academy's Panel on Scientific Values. For more details, see the Academy Committee on Scientific Values page.

  20. Mallik, Prof. Roop

    Indian Academy of Sciences (India)

    Specialization: Molecular Motors, Phagosome Dynamics, Lipid Droplets, Triglyceride Secretion from Liver Address: Department of Biological Sciences, Tata Institute of Fundamental Research, Homi Bhabha Road, Mumbai 400 005, Maharashtra Contact: Office: (022) 2278 2702. Residence: (022) 2280 4703. Fax: (022) ...

  1. Spatial resolution of gas hydrate and permeability changes from ERT data in LARS simulating the Mallik gas hydrate production test

    Science.gov (United States)

    Priegnitz, Mike; Thaler, Jan; Spangenberg, Erik; Schicks, Judith M.; Abendroth, Sven

    2014-05-01

    The German gas hydrate project SUGAR studies innovative methods and approaches to be applied in the production of methane from hydrate-bearing reservoirs. To enable laboratory studies in pilot scale, a large reservoir simulator (LARS) was realized allowing for the formation and dissociation of gas hydrates under simulated in-situ conditions. LARS is equipped with a series of sensors. This includes a cylindrical electrical resistance tomography (ERT) array composed of 25 electrode rings featuring 15 electrodes each. The high-resolution ERT array is used to monitor the spatial distribution of the electrical resistivity during hydrate formation and dissociation experiments over time. As the present phases of poorly conducting sediment, well conducting pore fluid, non-conducting hydrates, and isolating free gas cover a wide range of electrical properties, ERT measurements enable us to monitor the spatial distribution of these phases during the experiments. In order to investigate the hydrate dissociation and the resulting fluid flow, we simulated a hydrate production test in LARS that was based on the Mallik gas hydrate production test (see abstract Heeschen et al., this volume). At first, a hydrate phase was produced from methane saturated saline water. During the two months of gas hydrate production we measured the electrical properties within the sediment sample every four hours. These data were used to establish a routine estimating both the local degrees of hydrate saturation and the resulting local permeabilities in the sediment's pore space from the measured resistivity data. The final gas hydrate saturation filled 89.5% of the total pore space. During hydrate dissociation, ERT data do not allow for a quantitative determination of free gas and remaining gas hydrates since both phases are electrically isolating. However, changes are resolved in the spatial distribution of the conducting liquid and the isolating phase with gas being the only mobile isolating phase

  2. Nuclear Well Log Properties of Natural Gas Hydrate Reservoirs

    Science.gov (United States)

    Burchwell, A.; Cook, A.

    2015-12-01

    Characterizing gas hydrate in a reservoir typically involves a full suite of geophysical well logs. The most common method involves using resistivity measurements to quantify the decrease in electrically conductive water when replaced with gas hydrate. Compressional velocity measurements are also used because the gas hydrate significantly strengthens the moduli of the sediment. At many gas hydrate sites, nuclear well logs, which include the photoelectric effect, formation sigma, carbon/oxygen ratio and neutron porosity, are also collected but often not used. In fact, the nuclear response of a gas hydrate reservoir is not known. In this research we will focus on the nuclear log response in gas hydrate reservoirs at the Mallik Field at the Mackenzie Delta, Northwest Territories, Canada, and the Gas Hydrate Joint Industry Project Leg 2 sites in the northern Gulf of Mexico. Nuclear logs may add increased robustness to the investigation into the properties of gas hydrates and some types of logs may offer an opportunity to distinguish between gas hydrate and permafrost. For example, a true formation sigma log measures the thermal neutron capture cross section of a formation and pore constituents; it is especially sensitive to hydrogen and chlorine in the pore space. Chlorine has a high absorption potential, and is used to determine the amount of saline water within pore spaces. Gas hydrate offers a difference in elemental composition compared to water-saturated intervals. Thus, in permafrost areas, the carbon/oxygen ratio may vary between gas hydrate and permafrost, due to the increase of carbon in gas hydrate accumulations. At the Mallik site, we observe a hydrate-bearing sand (1085-1107 m) above a water-bearing sand (1107-1140 m), which was confirmed through core samples and mud gas analysis. We observe a decrease in the photoelectric absorption of ~0.5 barnes/e-, as well as an increase in the formation sigma readings of ~5 capture units in the water-bearing sand as

  3. Mapping the Fluid Pathways and Permeability Barriers of a Large Gas Hydrate Reservoir

    Science.gov (United States)

    Campbell, A.; Zhang, Y. L.; Sun, L. F.; Saleh, R.; Pun, W.; Bellefleur, G.; Milkereit, B.

    2012-12-01

    An understanding of the relationship between the physical properties of gas hydrate saturated sedimentary basins aids in the detection, exploration and monitoring one of the world's upcoming energy resources. A large gas hydrate reservoir is located in the MacKenzie Delta of the Canadian Arctic and geophysical logs from the Mallik test site are available for the gas hydrate stability zone (GHSZ) between depths of approximately 850 m to 1100 m. The geophysical data sets from two neighboring boreholes at the Mallik test site are analyzed. Commonly used porosity logs, as well as nuclear magnetic resonance, compressional and Stoneley wave velocity dispersion logs are used to map zones of elevated and severely reduced porosity and permeability respectively. The lateral continuity of horizontal permeability barriers can be further understood with the aid of surface seismic modeling studies. In this integrated study, the behavior of compressional and Stoneley wave velocity dispersion and surface seismic modeling studies are used to identify the fluid pathways and permeability barriers of the gas hydrate reservoir. The results are compared with known nuclear magnetic resonance-derived permeability values. The aim of investigating this heterogeneous medium is to map the fluid pathways and the associated permeability barriers throughout the gas hydrate stability zone. This provides a framework for an understanding of the long-term dissociation of gas hydrates along vertical and horizontal pathways, and will improve the knowledge pertaining to the production of such a promising energy source.

  4. EFFECTIVENESS OF MC KENZIE EXERCISES IN REDUCING NECK AND BACK PAIN AMONG MADRASSA STUDENTS

    Directory of Open Access Journals (Sweden)

    Saima Aziz

    2016-02-01

    Full Text Available Background: In this advanced era, neck and back pain has become a common musculoskeletal problem. These symptoms have a high prevalence in the community and now they are affecting even our adolescents leaving a major impact on youth’s functional and educational activities. Nevertheless, the burden of these musculoskeletal pains, which relates not only to its prevalence but also to increase in physiological and psychological stress among them, distressing their creativity. Madrassa students have a daily exposure to neck and back pain due to poor posture. The McKenzie method is a popular treatment for back and neck pain among physical therapists. So, the intention of this study is to test the effectiveness of McKenzie exercises in neck and back pain, because hardly any data is available on McKenzie technique and its outcome in Pakistan. The objective of the study is to determine the effectiveness of McKenzie exercises in reducing neck and back pain among madrassa students. Methods: The students were recruited from Madrassa Darul Akram (Baldia town and Jamia Ashraf-ul-madrassa (Gulshan-e-Iqbal Karachi. One sixty three students aged between 12–18 years of both genders who were fulfilling the inclusion criteria were selected from Madrassa Darul Akram (Baldia town and Jamia Ashraf-ul-madrassa (Gulshane-Iqbal. The participants received McKenzie exercises programs intervention for three consecutive weeks. Outcome Measure: Neck Disability Index (NDI, Modified Oswestry Low Back Pain Disability Index (ODI and Numeric Pain Rating Scale (NPRS Results: The present study showed significant results in all three scales in both genders (p<0.001.Among sections, the Hafiz students revealed greater score in all 3 scales before treatment as compared to ‘Alim/Alima’ and ‘Nazra’ students and after treatment showed significant results in all 3 domains (p<0.001. Conclusion: Findings of this study revealed that madrassa students were more prone to develop neck

  5. Methane accumulation and forming high saturations of methane hydrate in sandy sediments

    Energy Technology Data Exchange (ETDEWEB)

    Uchida, T.; Waseda, A. [JAPEX Research Center, Chiba (Japan); Fujii, T. [Japan Oil, Gas and Metals National Corp., Chiba (Japan). Upstream Technology Unit

    2008-07-01

    Methane supplies for marine gas hydrates are commonly attributed to the microbial conversion of organic materials. This study hypothesized that methane supplies were related to pore water flow behaviours and microscopic migration in intergranular pore systems. Sedimentology and geochemistry analyses were performed on sandy core samples taken from the Nankai trough and the Mallik gas hydrate test site in the Mackenzie Delta. The aim of the study was to determine the influence of geologic and sedimentolic controls on the formation and preservation of natural gas hydrates. Grain size distribution curves indicated that gas hydrate saturations of up to 80 per cent in pore volume occurred throughout the hydrate-dominant sand layers in the Nankai trough and Mallik areas. Water permeability measurements showed that the highly gas hydrate-saturated sands have a permeability of a few millidarcies. Pore-space gas hydrates occurred primarily in fine and medium-grained sands. Core temperature depression, core observations, and laboratory analyses of the hydrates confirmed the pore-spaces as intergranular pore fillings. Results of the study suggested that concentrations of gas hydrates may require a pore space large enough to occur within a host sediments, and that the distribution of porous and coarser-grained sandy sediments is an important factor in controlling the occurrence of gas hydrates. 11 refs., 4 figs.

  6. Manual Correction of an Acute Lumbar Lateral Shift: Maintenance of Correction and Rehabilitation: A Case Report with Video

    OpenAIRE

    Laslett, Mark

    2009-01-01

    The acute onset lumbar lateral shift, otherwise known as a list or acute scoliosis, is a common clinical observation associated with low back pain. In general orthopaedics, the presence of a lateral shift is associated with a poor prognosis; however, a manual correction method devised by McKenzie is claimed to produce rapid reversal of the deformity and reduction in pain. This single-case report presents the details of the McKenzie Mechanical Diagnosis and Treatment (MDT) management of a majo...

  7. Attenuation and velocity dispersion in the exploration seismic frequency band

    Science.gov (United States)

    Sun, Langqiu

    the well logs; the models' parameters are adjusted by fitting the synthetic data to the observed data. In this way, seismic attenuation and velocity dispersion provide new insight into petrophysics properties at the Mallik and McArthur River sites. Potentially, observations of attenuation and velocity dispersion in the exploration seismic frequency band can improve the deconvolution process for vibrator data, Q-compensation, near-surface analysis, and first break picking for seismic data.

  8. Resonance – Journal of Science Education | Indian Academy of ...

    Indian Academy of Sciences (India)

    article/fulltext/reso/013/06/0561-0582. Keywords. Brachistochrone problem; Fermat; Steiner problem; Kakeya problem; geodesic. Author Affiliations. A K Mallik1. Department Of Mechanical Engineering, Indian Institute of Technology, Kanpur, India.

  9. Nature and the public: Urban ecology and the politics of transportation in Progressive - Era Chicago. / La naturaleza y el público: La ecología urbana y la política de transporte en la progresista - Era Chicago

    Directory of Open Access Journals (Sweden)

    Gurovich W. Alberto (Presentador

    2000-08-01

    Full Text Available This article argues that the model of urban ecology, as was formulated by Burgess, and McKenzie Park, comes from a uniquely local political context, in a city that had been the site of years of intense political agitation for reform. It shows how the specific model development will, in turn, used to intervene in this kind of "social laboratory of the nation ", to the extent that its principles will help identify priorities and dynamics of public policy Chicago in the decades following its publication. / Este artículo sostiene que el modelo de la ecología urbana, tal y como fuera formulado por Burgess, Park y McKenzie, surge de un contexto político específicamente local, en una ciudad que había sido el lugar de años de intensa agitación política de reforma. Se muestra cómo el específico desarrollo del modelo será, a su vez, utilizado para intervenir en esa suerte de "laboratorio social de la nación", en la medida en que sus postulados van a contribuir a determinar las prioridades y dinámicas de la política pública de Chicago en las décadas siguientes a su publicación.

  10. Dynein's Network of Chemomechanical Motor Cycles

    Science.gov (United States)

    Shen, Weibo; Wang, Ziqing; Wang, Guodong

    2012-07-01

    An eight-state network model of dynein's chemomechanical motor cycles is developed, in which the states of an effective single dynein head are represented by the number of ATP binding at the primary site and the number of ATP binding at other three secondary sites. The binding and unbinding of ATP, as well as the hydrolysis of ATP and the reverse process, are characterized by transition rates between certain states. Our results show that the stall force of dynein increases fast with ATP up to 1 mM ATP, beyond which it increases slowly to a saturated value, and that load and ATP concentration can adjust the step size of dynein, i.e., dynein can shift gears according to conditions. These results are in agreement with experiments [R. Mallik, B. C. Carter, S. A. Lex, S. J. King and S. P. Gross, Nature 427, 649 (2004)].

  11. 76 FR 77768 - Information Collection; Flathead and McKenzie Rivers and McKenzie National Recreational Trail...

    Science.gov (United States)

    2011-12-14

    ... completed and validated, the hardcopy questionnaires will be discarded. Data will be imported into SPSS (Statistical Package for the Social Sciences) for analysis. The database will be maintained at the respective...

  12. Pleiotropic consequences of misexpression of the developmentally ...

    Indian Academy of Sciences (India)

    Author Affiliations. Moushami Mallik1 2 Subhash C Lakhotia1. Cytogenetics Laboratory, Department of Zoology, Banaras Hindu University, Varanasi 221 005, India; Molecular Neurogenetics Laboratory, Max-Planck Institute for Molecular Biomedicine, Roentgenstrasse 20, 48149 Muenster, Germany ...

  13. Vegetation - McKenzie Preserve [ds703

    Data.gov (United States)

    California Natural Resource Agency — The California Native Plant Society (CNPS) Vegetation Program produced a vegetation map and classification for approximately 11,600 acres primarily within Millerton...

  14. Morphology and slip rate of the Hurunui section of the Hope Fault, South Island, New Zealand

    International Nuclear Information System (INIS)

    Langridge, R.M.; Berryman, K.R.

    2005-01-01

    The Hurunui section of the Hope Fault is a newly defined, 42 km long geomorphic fault section which extends from Harper Pass to the Hope-Boyle River confluence. Reconnaissance mapping along the Hurunui section from Hope Shelter to Harper Pass provided new data on its location, geomorphology, displacement, and slip rate. More than 200 previously published field observations of dextrally and vertically displaced landforms along the fault provide data on the distribution of displacement along the fault trace. Five radiocarbon dates found in association with offset geomorphic features are presented and two new measures of dextral slip rate are calculated. At McKenzie Stream, a late Holocene fan complex is cut by the Hope Fault. Young abandoned and active channels on this surface show dextral offsets of up to 22 ± 2 m along a south-facing scarp with a height of up to 5 m. Woody litter from a unit in this complex has yielded a radiocarbon age of 2331 ± 55 yr BP and a corresponding minimum horizontal slip rate of 8.1-11.0 mm/yr. At Macs Knob, large dextral deflections of stream catchments are linked to episodes of glacial resetting of the landscape. Correlation of the offset of 'Macs stream' (166 ± 17 m) with a post-Aranuian age peat (10,782 ± 60 yr BP) yields a maximum horizontal slip rate of 13.0 ± 1.5 mm/yr. The single-event dextral displacement, based on offset stream channels at McKenzie fan, is 3.2-3.8 m (av. c. 3.4 m). The ratio of dextral to vertical slip is c. 7 ± 2:1, indicating that the Hope Fault has a dominantly strike-slip sense of motion. The average recurrence interval for the last 5-7 events (i.e., to produce 19-24 m slip at McKenzie fan) is 310-490 yr. The age of the most recent surface-rupturing earthquake at this site is not known, though felt effects, fault scaling, and landscape arguments indicate it was not the AD 1888 North Canterbury earthquake. (author). 48 refs., 10 figs., 2 tabs

  15. Ka kalal võivad olla tunded / Priit Ennet

    Index Scriptorium Estoniae

    Ennet, Priit

    2016-01-01

    Simon McKenzie ja Sonia Ray katsest sebrakaladega, mida nad tõlgendavad nii, et stressiseisundis kalad kutsusid selle leevendamiseks meelega esile palaviku seisundi eelistades ujuda harjumuspärasest kõrgema temperatuuriga vees

  16. Sadhana | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Sadhana. Sandip Bysakh. Articles written in Sadhana. Volume 39 Issue 4 August 2014 pp 957-970. Correlation between optical emission spectra and the process parameters of a 915 MHz microwave plasma CVD reactor used for depositing polycrystalline diamond coatings · Awadesh Kumar Mallik Sandip ...

  17. Ekspert: poerohkus ajab Eesti hinnad kõrgeks / Katre Pilvinski ; kommenteerinud Raul Puusepp

    Index Scriptorium Estoniae

    Pilvinski, Katre

    2010-01-01

    Kanada Guelphi ülikooli turundus- ja kaubandusprofessor Brent McKenzie leiab, et Eesti jaekaubandusturul on liiga palju erinevaid super- ja hüpermarketeid ning seetõttu pole jaemüüjatel suurt mõju varustajatele

  18. Nigerian Journal of Clinical Practice - Vol 16, No 4 (2013)

    African Journals Online (AJOL)

    Observational assessment and correlates to blood pressure of future physicians of Bengal · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. P Das, M Basu, K Chowdhury, S Mallik, G Dhar, A Biswas. http://dx.doi.org/10.4103/1119-3077.116884 ...

  19. Journal of Chemical Sciences | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Chemical Sciences; Volume 128; Issue 1. Formation of BH3 Adducts with Pyridine-2-Methylaminophosphine ligands: An experimental and computational study. Harinath Adimulam Dwijendra P Kukri Bhabani S Mallik Tarun K Panda. Regular Articles Volume 128 Issue 1 January 2016 pp 53-60 ...

  20. Journal of Earth System Science | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Earth System Science. Tapas Acharya. Articles written in Journal of Earth System Science. Volume 121 Issue 2 April 2012 pp 453-462. Analysis of lineament swarms in a Precambrian metamorphic rocks in India · Tapas Acharya Sukumar Basu Mallik · More Details Abstract Fulltext PDF.

  1. 75 FR 27623 - Qualification of Drivers; Exemption Applications; Vision

    Science.gov (United States)

    2010-05-17

    .... Askin, Paul J. Bannon, Ernie E. Black, Ronnie F. Bowman, Gary O. Brady, Stephen H. Goldcamp, Steven F. Grass, Wai F. King, Dennis E. Krone, Richard J. McKenzie, Jr., Christopher J. Meerten, Craig W. Miller...

  2. Soorituskeskne hindamine on värbamises töökindel meetod

    Index Scriptorium Estoniae

    2007-01-01

    Personalivärbamise firma Ferguson McKenzie uurimusest, milles selgitati soorituse hindamisele põhinevate valikumeetodite tõhusust, vaadeldes, kuidas eelnev töösooritus ja saavutused võimaldavad ennustada töötaja edukust ka tulevikus

  3. Journal of Chemical Sciences | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Chemical Sciences. G Krishnamoorthy. Articles written in Journal of Chemical Sciences. Volume 115 Issue 4 August 2003 pp 307-317 Physical and Theoretical. Kinetics of proton transfer in a green fluorescent protein: A laser-induced pH jump study · Roop Mallik Jayant B Udgaonkar G ...

  4. Managerial Techniques in Educational Administration.

    Science.gov (United States)

    Lane, John J.

    1983-01-01

    Management techniques developed during the past 20 years assume the rational bureaucratic model. School administration requires contingent techniques. Quality Circle, Theory Z, and the McKenzie 7-Framework are discussed as techniques to increase school productivity. (MD)

  5. 75 FR 38603 - Qualification of Drivers; Exemption Renewals; Vision

    Science.gov (United States)

    2010-07-02

    ... James C. Askin, Paul J. Bannon, Ernie E. Black, Ronnie F. Bowman, Gary O. Brady, Stephen H. Goldcamp, Steven F. Grass, Wai F. King, Dennis E. Krone, Richard J. McKenzie, Jr., Christopher J. Meerten, Craig W...

  6. Is nuclear energy safe for workers and the public. III

    International Nuclear Information System (INIS)

    McKenzie, J.J. Jr.

    1976-01-01

    Dr. McKenzie says a national energy policy does exist, being based on synthetic fuels from coal and nuclear energy to meet future demands, and based on a complete lack of attention to conservation. In meeting energy demands for the future, he feels the opportunity still exists to create the scenario that will require meaningful jobs in the process, jobs requiring less capital and less energy. On the risks of nuclear energy, Dr. McKenzie discusses the funding, research, and results of the Atomic Energy Commission's safety program. He airs his views on WASH-1400, the study by Professor Norman Rasmussen, dealing with the possibilities of reactor core meltdowns. He thinks a worse problem resulting from nuclear power plants is that of waste disposal and cites AEC's poor record of managing these wastes in Kansas and elsewhere. In concluding, Dr. McKenzie says: (1) nuclear power may not be the best thing in the world, maybe we should look at other alternatives; (2) conservation is most important, and creates jobs at the same time if handled correctly; (3) AFL-C10 should sponsor a study on energy systems investigating its employment potential, net energy, economic factors, and capital requirements; and (4) construction of nuclear and coal plants will create jobs, but building solar plants will create jobs with fewer restraints on the environment. A panel discussion follows this, the third paper, on nuclear safety for workers and the public

  7. Disease: H00753 [KEGG MEDICUS

    Lifescience Database Archive (English)

    Full Text Available Aydogdu O, Derbent M, Garcia-Minaur S, Reardon W, Gener B, Shalev S, Smith R, Wo... SB, Urquhart JE, Hilton E, McKenzie EA, Kammerer RA, Lewis M, Kerr B, Stuart H, Donnai D, Long DA, Burgu B,

  8. Roop Mallik | Speakers | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Teamwork in molecular motors: A cell biology perspective View Presentation / View Video. The unit generators of force that drive almost all biological movement are nanoscale molecules called motor proteins. A single motor generates a few pico-Newtons of force, which is not sufficient for most cellular processes. Multiple ...

  9. Bulletin of Materials Science | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Bulletin of Materials Science. S K Biswas. Articles written in Bulletin of Materials Science. Volume 33 Issue 3 June 2010 pp 251-255 Polymers. Effect of substrate roughness on growth of diamond by hot filament CVD · Awadesh K Mallik S R Binu L N Satapathy Chandrabhas Narayana Md Motin Seikh S A ...

  10. Geochemical characteristics of Mesoproterozoic metabasite dykes ...

    Indian Academy of Sciences (India)

    High Mg# observed in a number of samples indicates their derivation from .... show characteristic of orangeites, lamproites or ail- ... ite, and iron oxides. .... while preparing powder for the chemical analy- ses. ..... Cai K, Sun M, Yuan C, Zhao G, Xiao W, Long X and Wu .... Mallik A K, Gupta S N and Ray Barman T 1991 Dating.

  11. Pramana – Journal of Physics | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Pramana – Journal of Physics. Dipak Ghosh. Articles written in Pramana – Journal of Physics. Volume 63 Issue 5 November 2004 pp 963-968 Research Articles. Strong pionic intermittency in `cold' events in 12C–AgBr interactions at 4.5 A GeV · Dipak Ghosh Argha Deb Asok Kumar Mallik Sharmila Sarkar ...

  12. Turism rikastab : rahvusvaheline turismikonverents

    Index Scriptorium Estoniae

    2006-01-01

    28. septembril toimus Tallinnas Rahvusraamatukogus rahvusvaheline turismikonverents"Turism rikastab". Ülevaade majandus- ja kommunikatsiooniministeeriumi majandusarengu asekantsleri Maria Värtoni, Graham Mckenzie, Linnar Viigi, Nick Skelloni, Mario Ascencao (Haagi ülikool), David Carsoni (Ulsteri ülikool), Vesa Heikkineni ja Imre Sooääre ettekannetest

  13. Rhizobium as a crop enhancer and biofertilizer for increased cereal ...

    African Journals Online (AJOL)

    OHWESIRI IBUJE

    2010-09-13

    Sep 13, 2010 ... INTRODUCTION. The United Nations Food and Agriculture Organization ... new insights into recent development of rhizobia-cereal interaction. .... which caused changes in root morphology and physiology that resulted in .... Andrews M, James EK, Cummings SP, Zavalin AA, Vinogradova LV,. McKenzie BA ...

  14. ORIGINAL ARTICLE

    African Journals Online (AJOL)

    User

    Keywords: Asymptomatic bacteriuria, pregnancy, urine, Prevalence, Parity. INTRODUCTION. Urinary Tract Infections (UTIs) is an infection caused by the presence and growth of microorganisms anywhere in the urinary tract. It is perhaps the single most common bacterial infection of mankind (Morgan and McKenzie,. 1993 ...

  15. Secondary phases formed during nuclear waste glass-water interactions: Thermodynamic and derived properties

    International Nuclear Information System (INIS)

    McKenzie, W.F.

    1992-08-01

    The thermodynamic properties of secondary phases observed to form during nuclear waste glass-water interactions are of particular interest as it is with the application of these properties together with the thermodynamic properties of other solid phases, fluid phases, and aqueous species that one may predict the environmental consequences of introducing radionuclides contained in the glass into groundwater at a high-level nuclear waste repository. The validation of these predicted consequences can be obtained from laboratory experiments and field observations at natural analogue sites. The purpose of this report is to update and expand the previous compilation (McKenzie, 1991) of thermodynamic data retrieved from the literature and/or estimated for secondary phases observed to form (and candidate phases from observed chemical compositions) during nuclear waste glass-water interactions. In addition, this report includes provisionally recommended thermodynamic data of secondary phases

  16. 78 FR 36508 - Notice of Sugar Purchase and Exchange for Re-Export Program Credits; and Notice of Re-Export...

    Science.gov (United States)

    2013-06-18

    ...; telephone (202) 690-0734. For sugar purchase and general exchange information contact Pamela McKenzie... license balance within certain limits. Sugar exported or transferred is subtracted from the license balance, resulting in a license ``credit;'' sugar imported is added to the balance, resulting in a license...

  17. Genesis of a Joint Gallery of Sport Art.

    Science.gov (United States)

    Kozar, Andrew J.

    1989-01-01

    The University of Pennsylvania's dual sport art gallery showcases the work of R. Taft McKenzie and Joe Brown, two of the premier sport artists of our time. This article briefly outlines the artists' careers and describes the planning which led to establishment of the gallery. (IAH)

  18. New Fellows and Honorary Fellow

    Indian Academy of Sciences (India)

    Home; Fellowship. Fellow Profile. Elected: 1934 Section: Engineering & Technology. Taylor, Edward McKenzie 1940-43. Date of birth: 1889. Specialization: Agriculture. YouTube; Twitter; Facebook; Blog. Academy News. IAS Logo. 29th Mid-year meeting. Posted on 19 January 2018. The 29th Mid-year meeting of the ...

  19. Microeconomic determinants of skilled migration: The case of Suriname

    NARCIS (Netherlands)

    T.W. Dulam (Tina); Ph.H.B.F. Franses (Philip Hans)

    2014-01-01

    markdownabstract__Abstract__ Suriname witnesses a brain drain, in particular to the Netherlands. We study the determinants of this brain drain for skilled individuals, where we rely on an adaptation of the survey proposed in Gibson and McKenzie (2011). We managed to interview a unique set of 286

  20. Teekonnad tajutunnelites / Aita Kivi

    Index Scriptorium Estoniae

    Kivi, Aita, 1954-

    2001-01-01

    Sisu : Siri Hustvedt. Pimesi; Boris Vian. Päevade vaht; Christian Lore Weber. Altarimuusika; Kurt Vonnegut. Kassikangas; Jean Sasson. Printsess Sultana tütred; Karen Robards. Senaatori naine; Matthias Johann Eisen. Näkid, kratid, luupainajad; Mats Traat. Harala elulood; Steven L. McKenzie. Kuningas Taavet; Sally Ward. Terane laps; Ted Hughes. Luuletused

  1. Seismic Modeling Of Reservoir Heterogeneity Scales: An Application To Gas Hydrate Reservoirs

    Science.gov (United States)

    Huang, J.; Bellefleur, G.; Milkereit, B.

    2008-12-01

    Natural gas hydrates, a type of inclusion compound or clathrate, are composed of gas molecules trapped within a cage of water molecules. The occurrence of gas hydrates in permafrost regions has been confirmed by core samples recovered from the Mallik gas hydrate research wells located within Mackenzie Delta in Northwest Territories of Canada. Strong vertical variations of compressional and shear sonic velocities and weak surface seismic expressions of gas hydrates indicate that lithological heterogeneities control the distribution of hydrates. Seismic scattering studies predict that typical scales and strong physical contrasts due to gas hydrate concentration will generate strong forward scattering, leaving only weak energy captured by surface receivers. In order to understand the distribution of hydrates and the seismic scattering effects, an algorithm was developed to construct heterogeneous petrophysical reservoir models. The algorithm was based on well logs showing power law features and Gaussian or Non-Gaussian probability density distribution, and was designed to honor the whole statistical features of well logs such as the characteristic scales and the correlation among rock parameters. Multi-dimensional and multi-variable heterogeneous models representing the same statistical properties were constructed and applied to the heterogeneity analysis of gas hydrate reservoirs. The petrophysical models provide the platform to estimate rock physics properties as well as to study the impact of seismic scattering, wave mode conversion, and their integration on wave behavior in heterogeneous reservoirs. Using the Biot-Gassmann theory, the statistical parameters obtained from Mallik 5L-38, and the correlation length estimated from acoustic impedance inversion, gas hydrate volume fraction in Mallik area was estimated to be 1.8%, approximately 2x108 m3 natural gas stored in a hydrate bearing interval within 0.25 km2 lateral extension and between 889 m and 1115 m depth

  2. Site specific information in site selection

    International Nuclear Information System (INIS)

    Aeikaes, T.; Hautojaervi, A.

    1998-01-01

    The programme for the siting of a deep repository for final disposal of spent nuclear fuel was started already in 1983 and is carried out today by Posiva Oy which continues the work started by Teollisuuden Voima Oy. The programme aims at site selection by the end of the year 2000. The programme has progressed in successive interim stages with defined goals. After an early phase for site identification, five sites were selected in 1987 for preliminary site characterisation. Three of these were selected and judged to be best suited for the more detailed characterisation in 1992. An additional new site was included into the programme based on a separate feasibility study in the beginning of 1997. Since the year 1983 several safety assessments together with technical plans of the facility have been completed. When approaching the site selection the needs for more detailed consideration of the site specific properties in the safety assessment have been increased. The Finnish regulator STUK has published a proposal for general safety requirements for the final disposal of spent nuclear fuel in Finland. This set of requirements has been projected to be used in conjunction of the decision making by the end 2000. Based on the site evaluation all sites can provide a stable environment and there is evidence that the requirements for the longevity of the canister can be fulfilled at each site. In this manner the four candidate sites do not differ too much from each other. The main difference between the sites is in the salinity of the deep groundwater. The significance of differences in the salinity for the long-term safety cannot be defined yet. The differences may contribute to the discussion of the longevity of the bentonite buffer and also to the modelling of the groundwater flow and transport. The use of the geosphere as a transport barrier is basically culminated on the questions about sparse but fast flow routes and 'how bad channeling can be'. To answer these questions

  3. USGS leads United States effort in Mallik Well

    Science.gov (United States)

    2002-01-01

    This winter, in the extremely cold, far reaches of the upper Northwest Territory of Canada, there is an international consortium of researchers participating in a program to study methane hydrates. The researchers are currently drilling a 1200 m-deep production research well through the permafrost. It is one of three wells located in the Mackenzie Delta, on the shore of the Beaufort Sea. Two observation wells were drilled adjacent to the main production test well earlier this year.Research objectives for the program focus on two themes: (1) the assessment of the production and properties of gas hydrates, and (2) an assessment of the stability of continental gas hydrates given warming trends predicted by climate change models. Of particular interest is the physical response of the gas hydrate to depressurization and thermal production stimulation. Cores are being taken from the well, and scientists hope to retrieve at least 200 m of core, including all the gas hydrate-rich intervals. Once cored, the samples are transported 200 kilometers over ice roads to Inuvik. Nearly 60 researchers are examining the cores for everything from geophysical parameters to microbiological analyses.

  4. International Students' Attitudes Towards Malaysian English Ethnolects

    Science.gov (United States)

    Khojastehrad, Shadi; Rafik-Galea, Shameem; Abdullah, Ain Nadzimah

    2015-01-01

    Language attitudes are learned and formed in our social environment through hearing others referring to certain groups or people's languages and cultures, and also by exposure to particular varieties spoken in the context. This might lead to stereotyping English and its native speakers (McKenzie, 2008). In this sense, it is pedagogically…

  5. Public Affairs Training for the Army’s Officer Corps: Need or Neglect?

    Science.gov (United States)

    1983-06-06

    Individual Research Project, No. AD-783-802. Carlisle Barracks, Pennsylvania, 1974. McKenzie, Colin . "A Look at the News Media." US Army War College Mono...SAID IN 1978 Cronkite, Walter. "On Value of Newspaper Training for TV Reporters." San Francisco Examiner and Chronicle. March 5, 1978, p. 38. Drury

  6. Copper-promoted methylene C-H oxidation to a ketone derivative by O2

    DEFF Research Database (Denmark)

    Deville, Claire; McKee, Vickie; McKenzie, Christine J.

    2017-01-01

    stoichiometric dpeo C-H oxidation is reminiscent of the previously observed catalysis of dpeo oxidation by Mn(ii) [C. Deville, S. K. Padamati, J. Sundberg, V. McKee, W. R. Browne, C. J. McKenzie, Angew. Chem., Int. Ed., 2016, 55, 545-549]. By contrast dpeo oxidation is not observed during complexation reactions...

  7. Eluohtlik töö: globaalne üleskutse ajakirjanike turvalisuse kaitseks

    Index Scriptorium Estoniae

    Spindelegger, Michael

    2012-01-01

    Austria Vabariigi asekantsleri ja välisministri Michael Spindeleggeri ning Rahvusvahelise Pressiinstituudi (IPI) tegevdirektori Alison Bethel McKenzie ühine kommentaar selle aasta septembris ÜRO Inimõiguste Nõukogu poolt vastu võetud resolutsioonile ajakirjanike turvalisuse kohta ning ÜRO agentuuride juhtide koordinatsiooninõukogu poolt vastu võetud ajakirjanike turvalisust puudutavast tegevusplaanist

  8. Factors influencing academic success or failure of first-year and ...

    African Journals Online (AJOL)

    Erna Kinsey

    countries, such as Australia and the USA, where there is strong com- petition for university entrance. There is some research support for this practice (e.g. McKenzie & Schweitzer, 2001) but, in general, the ability of these techniques to predict student success has been quite limited (Riggs & Riggs, 1990-91; Graham, 1991).

  9. Site organization and site arrangement

    International Nuclear Information System (INIS)

    Boissonnet, B.; Macqueron, J.F.

    1976-01-01

    The present paper deals with criteria for the choice of a production unit or power plant site, the organization and development of a site in terms of its particular characteristics and takes into account personnel considerations in site organizations as well as the problem of integrating the architecture into the environment. (RW) [de

  10. Integrating evidence into practice: use of McKenzie-based treatment for mechanical low back pain

    Directory of Open Access Journals (Sweden)

    Clarke S

    2011-11-01

    Full Text Available Angela Dunsford1, Saravana Kumar1,2, Sarah Clarke1 1International Centre for Allied Health Evidence, 2School of Health Sciences, University of South Australia, Adelaide, South Australia, Australia Abstract: Low back pain (LBP is a major health issue with significant socioeconomic implications in most Western countries. Many forms of treatment have been proposed and investigated in the past, with exercise being a commonly prescribed intervention. Within allied health, in particular physiotherapy, there has been a growing movement that recognizes the role of the McKenzie method in treating LBP. Within the McKenzie framework, directional preference (DP exercises are one such intervention, with preliminary data demonstrating its effectiveness in the management of LBP. In this paper, we aim to integrate the evidence from current research, identified using a systematic review, and utilize a practical real-life case scenario to outline how evidence from the literature can be implemented in clinical practice. The findings from the systematic review indicate that DP exercises may have positive effects in the management of LBP. While the body of evidence to support this is limited (only four studies and therefore modest at best, it does provide some emerging evidence to support the use of DP exercises in clinical practice. Despite this, gaps also persist in the literature on DP exercises, and this relates to the exercise parameters and the compliance rates. Recognizing this dichotomy (modest evidence in some areas and evidence gaps in other areas, which is likely to confront health practitioners, using a practical approach with a real-life clinical scenario, we outline how the evidence from the systematic review can be implemented in clinical practice. This approach builds on the philosophy of evidence-based practice of integrating research evidence with clinical expertise and patient values. Keywords: low back pain, McKenzie method, directional

  11. Vulnerability of water supply from the Oregon Cascades to changing climate: linking science to users and policy

    Science.gov (United States)

    Kathleen A. Farley; Christina Tague; Gordon E. Grant

    2011-01-01

    Despite improvements in understanding biophysical response to climate change, a better understanding of how such changes will affect societies is still needed. We evaluated effects of climate change on the coupled human-environmental system of the McKenzie River watershed in the Oregon Cascades in order to assess its vulnerability. Published empirical and modeling...

  12. Managers’ perspectives: practical experience and challenges associated with variable-density operations and uneven-aged management

    Science.gov (United States)

    Kurtis E. Steele

    2013-01-01

    Variable-density thinning has received a lot of public attention in recent years and has subsequently become standard language in most of the Willamette National Forest’s timber management projects. Many techniques have been tried, with varying on-the-ground successes. To accomplish variable-density thinning, the McKenzie River Ranger District currently uses...

  13. Kaubakategooriate juhtimine annab konkurentide ees eelise / Marika Merilai

    Index Scriptorium Estoniae

    Merilai, Marika

    2008-01-01

    Tootekategooriate või ka kaubakategooriate juhtimine on ettevõtte äristrateegia, mis võimaldab jaekaubandusettevõttel saavutada konkurentidest paremaid tulemusi. Kanada turundusprofessori Brent McKenzie sõnul on kaubakategooriate juhtimine keeruline, kuna pole olemas ühte standardset lahendust, kuidas ettevõttes kategooriate juhtimist teostada. Skeem: Kaubakategooriate juhtimise eesmärgid. Kommenteerib ASi A-Selver sortimendijuht Agi Metsandi

  14. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  15. Site Closure Strategy Model for Creosote Site

    International Nuclear Information System (INIS)

    Coll, F.R.; Gray, D.R.

    2009-01-01

    In conjunction with RCRA site corrective action at an active wood preserving facility, a risk-based site closure strategy was developed and incorporated the performance of a dense non-aqueous phase liquid (DNAPL) source recovery remedy, a monitored natural attenuation (MNA) remedy for dissolved phase groundwater, and institutional controls. Innovative creosote DNAPL source recovery has been undertaken at the Site since 1998. Pooled creosote DNAPL is present 90 feet below ground within a transmissive sand and gravel aquifer with a saturated thickness of approximately 80 feet. The creosote DNAPL source is situated on the property boundary of the site and has generated a 1/2 mile off-site dissolved phase plume, creating significant NAPL management and remedial technology verification issues. To date, over 120,000 gallons of creosote DNAPL have been recovered from the subsurface utilizing a modified circulation well technology. A mass discharge flux protocol was developed to serve as a major performance metrics for the continuation of source removal efforts and to support the application of monitored natural attenuation as an associated remedial technology for groundwater. The mass removal success has supported the MNA remedy for dissolved phase groundwater and the associated development of institutional controls. The enacted site management strategy outlines the current and future risk management activities for the Site and represents an appropriate site closure strategy for the Site. (authors)

  16. On-line retailing : a Canadian perspective / Brent McKenzie

    Index Scriptorium Estoniae

    McKenzie, Brent

    2001-01-01

    Kaanel ajak. ilmumisaeg Winter 2001/2002. Kanadas on interneti teel ostjaid alla 2% neist, kes vastavaid interneti-lehekülgi külastavad. Konservatiivset suhtumist saab aga muuta, kui pakkuda head ja turvalist teenust ning kaupa hea hinnaga

  17. On-line retailing : a Canadian perspective / Brent McKenzie

    Index Scriptorium Estoniae

    McKenzie, Brent

    2002-01-01

    Kaanel ajak. ilmumisaeg 2001/2002. Kanadas on interneti teel ostjaid alla 2% neist, kes vastavaid interneti-lehekülgi külastavad. Konservatiivset suhtumist saab aga muuta, kui pakkuda head ja turvalist teenust ning kaupa hea hinnaga

  18. Study of site layout in the Rokkasho site

    International Nuclear Information System (INIS)

    Sato, Kazuyoshi; Tamura, Kousaku; Yagenji, Akira; Sekiya, Shigeki; Takahashi, Hideo; Neyatani, Yuzuru; Uehara, Masaharu; Motohashi, Keiichi; Hashimoto, Masayoshi; Ogino, Shunji; Nagamatsu, Nobuhide

    2006-03-01

    The Final Design Report (FDR) of the International Thermonuclear Experimental Reactor (ITER) was published on July 2001 as a summary of the Engineering Design Activity (EDA). After the EDA, site dependent design has been investigated for the invitation of ITER toward Rokkasho Site (Iyasakadai area) in Aomori prefecture. This report describes the results of site layout of major buildings and structures of ITER in the Rokkasho-Site. The data of the ground near the site and the results of site dependent design in Japan were applied to this study. Through this study, the most appropriate site layout has been constructed with satisfaction of following conditions. (1) Bedrock level at the tokamak complex building is relatively high and it can be reduced the cost of excavation and foundation work. (2) Total amount of excavation soil for site preparation is minimized and the flexibility of the layout is ensured with flat ground level. (3) Accessibility of human and equipments, reduction of noise and vibration to the environment can be obtained. Total length of ducts and piping between buildings in site is minimized. (author)

  19. Theory for site-site pair distribution functions of molecular fluids. II. Approximations for the Percus--Yevick site-site direct correlation functions

    International Nuclear Information System (INIS)

    Johnson, E.

    1977-01-01

    A theory for site-site pair distribution functions of molecular fluids is derived from the Ornstein-Zernike equation. Atom-atom pair distribution functions of this theory which were obtained by using different approximations for the Percus-Yevick site-site direct correlation functions are compared

  20. SitesIdentify: a protein functional site prediction tool

    Directory of Open Access Journals (Sweden)

    Doig Andrew J

    2009-11-01

    Full Text Available Abstract Background The rate of protein structures being deposited in the Protein Data Bank surpasses the capacity to experimentally characterise them and therefore computational methods to analyse these structures have become increasingly important. Identifying the region of the protein most likely to be involved in function is useful in order to gain information about its potential role. There are many available approaches to predict functional site, but many are not made available via a publicly-accessible application. Results Here we present a functional site prediction tool (SitesIdentify, based on combining sequence conservation information with geometry-based cleft identification, that is freely available via a web-server. We have shown that SitesIdentify compares favourably to other functional site prediction tools in a comparison of seven methods on a non-redundant set of 237 enzymes with annotated active sites. Conclusion SitesIdentify is able to produce comparable accuracy in predicting functional sites to its closest available counterpart, but in addition achieves improved accuracy for proteins with few characterised homologues. SitesIdentify is available via a webserver at http://www.manchester.ac.uk/bioinformatics/sitesidentify/

  1. Appendix 2: Risk-based framework and risk case studies. Risk assessment for wildfire in the Western United States.

    Science.gov (United States)

    David L. Peterson; Jeremy S. Littell

    2012-01-01

    Wildfire is one of the two most significant disturbance agents (the other being insects) in forest ecosystems of the Western United States, and in a warmer climate, will drive changes in forest composition, structure, and function (Dale et al. 2001, McKenzie et al. 2004). Although wildfire is highly stochastic in space and time, sufficient data exist to establish clear...

  2. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  3. Preliminary siting characterization Salt Disposition Facility - Site B

    International Nuclear Information System (INIS)

    Wyatt, D.

    2000-01-01

    A siting and reconnaissance geotechnical program has been completed in S-Area at the Savannah River Site in South Carolina. This program investigated the subsurface conditions for the area known as ''Salt Disposition Facility (SDF), Site B'' located northeast of H-Area and within the S-Area. Data acquired from the Site B investigation includes both field exploration and laboratory test data

  4. Automatic web site authoring with SiteGuide

    NARCIS (Netherlands)

    de Boer, V.; Hollink, V.; van Someren, M.W.; Kłopotek, M.A.; Przepiórkowski, A.; Wierzchoń, S.T.; Trojanowski, K.

    2009-01-01

    An important step in the design process for a web site is to determine which information is to be included and how the information should be organized on the web site’s pages. In this paper we describe ’SiteGuide’, a tool that automatically produces an information architecture for a web site that a

  5. Environmental isotopes to test hypotheses for fluid mud (mud bank) generation mechanisms along the southwest coast of India

    Digital Repository Service at National Institute of Oceanography (India)

    Jacob, N.; Ansari, M.A.; Revichandran, C.

    the sea (Mallik et al., 1988). Fluidmud has high socio-economic importance as it is considered responsible for the enormous fish catch during monsoon. Fluid mud is associated with high biological productivity as it is rich in organic matter, phytoplankton... tritium (3H), sourced from the fallout of thermo nuclear weapons testing, carried out in the atmosphere during 1950e1963, could be effectively used to identify the recent recharge (estimate residence time) from precipitation or surface water bodies...

  6. Site description of Forsmark at completion of the site investigation phase. SDM-Site Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-15

    The Swedish Nuclear Fuel and Waste Management Co., SKB, has undertaken site characterisation in two different areas, Forsmark and Laxemar-Simpevarp, in order to identify a suitable location for a geological repository of spent nuclear fuel according to the KBS-3 method. The site investigations have been conducted in campaigns, punctuated by data freezes. After each data freeze, the site data have been analysed and modelling has been carried out with the overall purpose to develop a site descriptive model (SDM). The site descriptive model is used by repository engineering to design the underground facility and to develop a repository layout adapted to the site. It is also essential for safety assessment, since the model is the only source for site-specific input. Another important use of the site descriptive model is in the environmental impact assessment. An SDM is an integrated model for geology, thermal properties, rock mechanics, hydrogeology, hydrogeochemistry, bedrock transport properties and a description of the surface system. The site descriptive model compiled in the current report, SDM-Site, presents an integrated understanding of the Forsmark area at the completion of the surface-based investigations, which were conducted at Forsmark during the period 2002 to 2007. It also provides a summary of the abundant underlying data and the discipline-specific models that support the site understanding. The description relies heavily on background reports that address, in particular, details in data analyses and modelling in the different disciplines. The Forsmark area is located in northern Uppland within the municipality of Oesthammar, about 120 km north of Stockholm. The candidate area for site investigation is located along the shoreline of Oeregrundsgrepen, within the north-western part of a major tectonic lens that formed between 1.87 and 1.85 billion years ago during the Svecokarelian orogeny. The candidate area is approximately 6 km long and 2 km wide. The

  7. Site description of Laxemar at completion of the site investigation phase. SDM-Site Laxemar

    Energy Technology Data Exchange (ETDEWEB)

    2009-12-15

    The Swedish Nuclear Fuel and Waste Management Company (SKB) has undertaken site characterisation in two different areas, Forsmark and Laxemar-Simpevarp, in order to identify a suitable location for a geological repository of spent nuclear fuel according to the KBS-3 method. The site investigations have been conducted in campaigns, punctuated by data freezes. After each data freeze, the site data have been analysed and modelling has been carried out with the overall purpose to develop a site descriptive model (SDM). The site descriptive model is used by repository engineering to design the underground facility and to develop a repository layout adapted to the site. It is also essential for safety assessment, since the SDM is the only source for site-specific input. Another important use of the site descriptive model is in the environmental impact assessment. An SDM is an integrated model of geology, thermal properties, rock mechanics, hydrogeology, hydrogeochemistry, bedrock transport properties and a description of the surface system. The site descriptive model compiled in the current report, SDM-Site Laxemar, presents an integrated understanding of the Laxemar-Simpevarp area (with special emphasis on the Laxemar subarea) at the completion of the surface-based investigations, which were conducted during the period 2002 to 2007. A summary is also provided of the abundant underlying data and the discipline specific models that support the site understanding. The description relies heavily on background reports that address, in particular, details of the data analyses and modelling of the different disciplines. The Laxemar-Simpevarp area is located in the province of Smaaland within the municipality of Oskarshamn, about 230 km south of Stockholm. The candidate area for site investigation is located along the shoreline of the strait of Kalmarsund, within a 1.8 billion year old suite of well preserved bedrock belonging to the Transscandinavian Igneous Belt formed during

  8. Site description of Laxemar at completion of the site investigation phase. SDM-Site Laxemar

    International Nuclear Information System (INIS)

    2009-12-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) has undertaken site characterisation in two different areas, Forsmark and Laxemar-Simpevarp, in order to identify a suitable location for a geological repository of spent nuclear fuel according to the KBS-3 method. The site investigations have been conducted in campaigns, punctuated by data freezes. After each data freeze, the site data have been analysed and modelling has been carried out with the overall purpose to develop a site descriptive model (SDM). The site descriptive model is used by repository engineering to design the underground facility and to develop a repository layout adapted to the site. It is also essential for safety assessment, since the SDM is the only source for site-specific input. Another important use of the site descriptive model is in the environmental impact assessment. An SDM is an integrated model of geology, thermal properties, rock mechanics, hydrogeology, hydrogeochemistry, bedrock transport properties and a description of the surface system. The site descriptive model compiled in the current report, SDM-Site Laxemar, presents an integrated understanding of the Laxemar-Simpevarp area (with special emphasis on the Laxemar subarea) at the completion of the surface-based investigations, which were conducted during the period 2002 to 2007. A summary is also provided of the abundant underlying data and the discipline specific models that support the site understanding. The description relies heavily on background reports that address, in particular, details of the data analyses and modelling of the different disciplines. The Laxemar-Simpevarp area is located in the province of Smaaland within the municipality of Oskarshamn, about 230 km south of Stockholm. The candidate area for site investigation is located along the shoreline of the strait of Kalmarsund, within a 1.8 billion year old suite of well preserved bedrock belonging to the Transscandinavian Igneous Belt formed during

  9. Site description of Forsmark at completion of the site investigation phase. SDM-Site Forsmark

    International Nuclear Information System (INIS)

    2008-12-01

    The Swedish Nuclear Fuel and Waste Management Co., SKB, has undertaken site characterisation in two different areas, Forsmark and Laxemar-Simpevarp, in order to identify a suitable location for a geological repository of spent nuclear fuel according to the KBS-3 method. The site investigations have been conducted in campaigns, punctuated by data freezes. After each data freeze, the site data have been analysed and modelling has been carried out with the overall purpose to develop a site descriptive model (SDM). The site descriptive model is used by repository engineering to design the underground facility and to develop a repository layout adapted to the site. It is also essential for safety assessment, since the model is the only source for site-specific input. Another important use of the site descriptive model is in the environmental impact assessment. An SDM is an integrated model for geology, thermal properties, rock mechanics, hydrogeology, hydrogeochemistry, bedrock transport properties and a description of the surface system. The site descriptive model compiled in the current report, SDM-Site, presents an integrated understanding of the Forsmark area at the completion of the surface-based investigations, which were conducted at Forsmark during the period 2002 to 2007. It also provides a summary of the abundant underlying data and the discipline-specific models that support the site understanding. The description relies heavily on background reports that address, in particular, details in data analyses and modelling in the different disciplines. The Forsmark area is located in northern Uppland within the municipality of Oesthammar, about 120 km north of Stockholm. The candidate area for site investigation is located along the shoreline of Oeregrundsgrepen, within the north-western part of a major tectonic lens that formed between 1.87 and 1.85 billion years ago during the Svecokarelian orogeny. The candidate area is approximately 6 km long and 2 km wide. The

  10. On-site and off-site activities

    International Nuclear Information System (INIS)

    Martin, H.D.

    1986-01-01

    Design principles for NPP training programs. Effects of NPP contracts. Effects of domestic industrial activities. The role of international bodies. Requirements for on-site training. Training abroad, technical, financial and social aspects. Training center on-site, an evaluation. (orig.)

  11. Region 9 NPL Sites (Superfund Sites 2013)

    Science.gov (United States)

    NPL site POINT locations for the US EPA Region 9. NPL (National Priorities List) sites are hazardous waste sites that are eligible for extensive long-term cleanup under the Superfund program. Eligibility is determined by a scoring method called Hazard Ranking System. Sites with high scores are listed on the NPL. The majority of the locations are derived from polygon centroids of digitized site boundaries. The remaining locations were generated from address geocoding and digitizing. Area covered by this data set include Arizona, California, Nevada, Hawaii, Guam, American Samoa, Northern Marianas and Trust Territories. Attributes include NPL status codes, NPL industry type codes and environmental indicators. Related table, NPL_Contaminants contains information about contaminated media types and chemicals. This is a one-to-many relate and can be related to the feature class using the relationship classes under the Feature Data Set ENVIRO_CONTAMINANT.

  12. Surface CO2 Exchange Dynamics across a Climatic Gradient in McKenzie Valley: Effect of Landforms, Climate and Permafrost

    Directory of Open Access Journals (Sweden)

    Natalia Startsev

    2016-11-01

    Full Text Available Northern regions are experiencing considerable climate change affecting the state of permafrost, peat accumulation rates, and the large pool of carbon (C stored in soil, thereby emphasizing the importance of monitoring surface C fluxes in different landform sites along a climate gradient. We studied surface net C exchange (NCE and ecosystem respiration (ER across different landforms (upland, peat plateau, collapse scar in mid-boreal to high subarctic ecoregions in the Mackenzie Valley of northwestern Canada for three years. NCE and ER were measured using automatic CO2 chambers (ADC, Bioscientific LTD., Herts, England, and soil respiration (SR was measured with solid state infrared CO2 sensors (Carbocaps, Vaisala, Vantaa, Finland using the concentration gradient technique. Both NCE and ER were primarily controlled by soil temperature in the upper horizons. In upland forest locations, ER varied from 583 to 214 g C·m−2·year−1 from mid-boreal to high subarctic zones, respectively. For the bog and peat plateau areas, ER was less than half that at the upland locations. Of SR, nearly 75% was generated in the upper 5 cm layer composed of live bryophytes and actively decomposing fibric material. Our results suggest that for the upland and bog locations, ER significantly exceeded NCE. Bryophyte NCE was greatest in continuously waterlogged collapsed areas and was negligible in other locations. Overall, upland forest sites were sources of CO2 (from 64 g·C·m−2·year−1 in the high subarctic to 588 g C·m−2·year−1 in mid-boreal zone; collapsed areas were sinks of C, especially in high subarctic (from 27 g·C·m−2 year−1 in mid-boreal to 86 g·C·m−2·year−1 in high subarctic and peat plateaus were minor sources (from 153 g·C·m−2·year−1 in mid-boreal to 6 g·C·m−2·year−1 in high subarctic. The results are important in understanding how different landforms are responding to climate change and would be useful in modeling the

  13. On-Site or Off-Site Renewable Energy Supply Options?

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Heiselberg, Per; Jensen, Rasmus Lund

    2012-01-01

    The concept of a Net Zero Energy Building (Net ZEB) encompasses two options of supplying renewable energy, which can offset energy use of a building, in particular on-site or off-site renewable energy supply. Currently, the on-site options are much more popular than the off-site; however, taking...... into consideration the limited area of roof and/or façade, primarily in the dense city areas, the Danish weather conditions, the growing interest and number of wind turbine co-ops, the off-site renewable energy supply options could become a meaningful solution for reaching ‘zero’ energy goal in the Danish context...... five technologies, i.e., two on-site options: (1) photovoltaic, (2) micro combined heat and power, and three off-site options: (1) off-site windmill, (2) share of a windmill farm and (3) purchase of green energy from the 100% renewable utility grid. The results indicate that in case of the on...

  14. Materialidad del texto, textualidad del libro

    Directory of Open Access Journals (Sweden)

    Roger Chartier

    2005-11-01

    Full Text Available This text wishes to show, through the case of Quixote, that the study of the conditions around text publishing and its sense understanding cannot be separated. The intercrossing between the history of the book (and printing and the sociology of texts as defined by D. F. McKenzie, seeks the possibility of overcoming the long-lasting and mutilating division between hermeneutics and bibliography.

  15. Interaction of Microbial and Abiotic Processes in Soil Leading to the (Bio)Conversion and Ultimate Attenuation of New Insensitive Munitions Compounds

    Science.gov (United States)

    2016-12-30

    adenine dinucleotide (phosphate) NC Camp Butner soil (alternative abbreviation, soil is from North Carolina) NCBI National Center for Biotechnology ...knowledge and perspectives of bioelimination of xenobiotic compounds. Journal of Biotechnology 51, 287-295, doi:http://dx.doi.org/10.1016/S0168...McKenzie, R. M. The synthesis of birnessite, cryptomelane, and some other oxides and hydroxides of manganese. Mineralogical Magazine 38, 493-502

  16. Nuclear power plant site evaluation using site population-meterology factor

    International Nuclear Information System (INIS)

    Rho, B.H.; Kang, C.H.

    1982-01-01

    In this paper, as a site evaluation technique, SPNF(Site Population Neteorology Factor) which is modified from SPF(Site Population Factor) of the USNRC model, is defined from site population and meteorology data in order to consider the radiological impacts to the population at large from the atmospheric dispersion of the radioactive effluents released during routine plant operation as well as accidental conditions. The SPMF model proved its propriety from the comparison of SPMF and SPF for Kori site. The relative suitability of Korean sites to the U.S. sites have been also examined using SPF. (Author)

  17. Superfund and Toxic Release Inventory Sites - MDC_ContaminatedSite

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — A point feature class of open DERM Contaminated sites - see phase code for status of site. Contaminated sites identifies properties where environmental contamination...

  18. An insight into subterranean flow proposition around Alleppey mudbank coastal sector, Kerala, India: Inferences from the subsurface profiles of ground penetrating radar

    Digital Repository Service at National Institute of Oceanography (India)

    Loveson, V.J.; Dubey, R.; DineshKumar, P.K.; Nigam, R.; Naqvi, S.W.A.

    -1 Author Version: Environ. Earth Sci., vol.75(20); 2016; no.1361 doi:10.1007/s12665-016-6172-6 An insight into subterranean flow proposition around Alleppey mudbank coastal sector, Kerala, India: inferences from the subsurface profiles of Ground... and productivity, physical and chemical aspects of the sea, annual drift etc. (Bristow et al., 1938; Varma and Kurup 1969; Gopinath and Qasim 1974; Jacob and Qasim (1974), Ramachandran and Mallik, 1985).Similar occurrences of mud banks in few other countries...

  19. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  20. Site decontamination

    International Nuclear Information System (INIS)

    Bicker, A.E.

    1981-01-01

    Among the several DOE sites that have been radiologically decontaminated under the auspices of the Nevada Operations Office are three whose physical characteristics are unique. These are the Tatum Dome Test Site (TDTS) near Hattiesburg, Mississippi; a location of mountainous terrain (Pahute Mesa) on the Nevada Test Site; and the GNOME site near Carlsbad, New Mexico. In each case the contamination, the terrain, and the climate conditions were different. This presentation includes a brief description of each site, the methods used to perform radiological surveys, the logistics required to support the decontamination (including health physics and sample analysis), and the specific techniques used to reduce or remove the contamination

  1. Bedrock hydrogeology Forsmark. Site descriptive modelling, SDM-Site Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    Follin, Sven (SF GeoLogic AB, Taeby (Sweden))

    2008-12-15

    The Swedish Nuclear Fuel and Waste Management Company (SKB) has conducted site investigations at two different locations, the Forsmark and Laxemar-Simpevarp areas, with the objective of siting a final repository for spent nuclear fuel according to the KBS-3 concept. Site characterisation should provide all data required for an integrated evaluation of the suitability of the investigated site and an important component in the characterisation work is the development of a hydrogeological model. The hydrogeological model is used by repository engineering to design the underground facility and to develop a repository layout adapted to the site. It also provides input to the safety assessment. Another important use of the hydrogeological model is in the environmental impact assessment. This report presents the understanding of the hydrogeological conditions of the bedrock at Forsmark reached following the completion of the surface-based investigations and provides a summary of the bedrock hydrogeological model and the underlying data supporting its development. It constitutes the main reference on bedrock hydrogeology for the site descriptive model concluding the surface-based investigations at Forsmark, SDM-site, and is intended to describe the hydraulic properties and hydrogeological conditions of the bedrock at the site and to give the information essential for demonstrating understanding

  2. Social Media Sites

    Science.gov (United States)

    Media Sites Site Registration Contact Us Search AF.mil: Home > AF Sites > Social Media Sites Social Media Welcome to the Air Force social media directory! The directory is a one-stop shop of official Air Force social media pages across various social media sites. Social media is all about

  3. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  4. Mach-6 Receptivity Measurements of Laser-Generated Perturbations on a Flared Cone

    Science.gov (United States)

    2014-08-01

    Shann Rufer, thank you for the guidance, the support, the living space, and of course, the wine and cheese! My fellow co-ops at NASA Langley...vorticity wave is given by McKenzie et al. [26] as tan θt = c M2n M1n tan θi (6.1) where c = a2/a1 and a indicates the speed of sound in the region

  5. Confidence assessment. Site-descriptive modelling SDM-Site Laxemar

    International Nuclear Information System (INIS)

    2009-06-01

    The objective of this report is to assess the confidence that can be placed in the Laxemar site descriptive model, based on the information available at the conclusion of the surface-based investigations (SDM-Site Laxemar). In this exploration, an overriding question is whether remaining uncertainties are significant for repository engineering design or long-term safety assessment and could successfully be further reduced by more surface-based investigations or more usefully by explorations underground made during construction of the repository. Procedures for this assessment have been progressively refined during the course of the site descriptive modelling, and applied to all previous versions of the Forsmark and Laxemar site descriptive models. They include assessment of whether all relevant data have been considered and understood, identification of the main uncertainties and their causes, possible alternative models and their handling, and consistency between disciplines. The assessment then forms the basis for an overall confidence statement. The confidence in the Laxemar site descriptive model, based on the data available at the conclusion of the surface based site investigations, has been assessed by exploring: - Confidence in the site characterization data base, - remaining issues and their handling, - handling of alternatives, - consistency between disciplines and - main reasons for confidence and lack of confidence in the model. Generally, the site investigation database is of high quality, as assured by the quality procedures applied. It is judged that the Laxemar site descriptive model has an overall high level of confidence. Because of the relatively robust geological model that describes the site, the overall confidence in the Laxemar Site Descriptive model is judged to be high, even though details of the spatial variability remain unknown. The overall reason for this confidence is the wide spatial distribution of the data and the consistency between

  6. Confidence assessment. Site-descriptive modelling SDM-Site Laxemar

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-15

    The objective of this report is to assess the confidence that can be placed in the Laxemar site descriptive model, based on the information available at the conclusion of the surface-based investigations (SDM-Site Laxemar). In this exploration, an overriding question is whether remaining uncertainties are significant for repository engineering design or long-term safety assessment and could successfully be further reduced by more surface-based investigations or more usefully by explorations underground made during construction of the repository. Procedures for this assessment have been progressively refined during the course of the site descriptive modelling, and applied to all previous versions of the Forsmark and Laxemar site descriptive models. They include assessment of whether all relevant data have been considered and understood, identification of the main uncertainties and their causes, possible alternative models and their handling, and consistency between disciplines. The assessment then forms the basis for an overall confidence statement. The confidence in the Laxemar site descriptive model, based on the data available at the conclusion of the surface based site investigations, has been assessed by exploring: - Confidence in the site characterization data base, - remaining issues and their handling, - handling of alternatives, - consistency between disciplines and - main reasons for confidence and lack of confidence in the model. Generally, the site investigation database is of high quality, as assured by the quality procedures applied. It is judged that the Laxemar site descriptive model has an overall high level of confidence. Because of the relatively robust geological model that describes the site, the overall confidence in the Laxemar Site Descriptive model is judged to be high, even though details of the spatial variability remain unknown. The overall reason for this confidence is the wide spatial distribution of the data and the consistency between

  7. Siting guidelines and their role in repository site selection

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1985-01-01

    The first requirement of the Nuclear Waste Policy Act was for the Secretary of Energy to issue general guidelines for siting repositories. The guidelines were to specify detailed geologic considerations that would be the primary criteria for the selection of sites in various host rocks, as well as factors that would qualify or disqualify any site from development as a repository. These guidelines were clearly intended to provide not only the framework for the siting program but also the stimulus for establishing effective communication and consultation among the parties involved in the program. The Act further required that the guidelines be a factor in the development of all future decision documents of the Office of Civilian Radioactive Waste Management, including the environmental assessments that would accompany the nomination of sites for characterization, the site-characterization plans that are to be prepared before the sinking of exploratory shafts at any candidate site, and the environmental impact statement that is to support the recommendation of a site for development as a repository. More than two years after its passage, the intention of the Act for the guidelines has been realized. Concurred in by the Nuclear Regulatory Commission on June 22, 1984, and issued by the Department in November 1984, the guidelines include postclosure technical guidelines that apply to conditions governing the long-term performance of the repository system; preclosure technical guidelines that apply to conditions governing the siting, construction, operation, and closure of the repository; and system guidelines whose objective is to ensure that the regulatory requirements of the Environmental Protection Agency and the Nuclear Regulatory Commission are met

  8. SiteGuide: An example-based approach to web site development assistance

    NARCIS (Netherlands)

    Hollink, V.; de Boer, V.; van Someren, M.; Filipe, J.; Cordeiro, J.

    2009-01-01

    We present ‘SiteGuide’, a tool that helps web designers to decide which information will be included in a new web site and how the information will be organized. SiteGuide takes as input URLs of web sites from the same domain as the site the user wants to create. It automatically searches the pages

  9. Feedback from performance assessment to site characterisation. The SITE-94 example

    International Nuclear Information System (INIS)

    Dverstorp, B.; Geier, J.

    1999-01-01

    Interaction and information exchange between site characterisation and performance assessment are key features of any successful radioactive waste management programme. Some examples are presented of the types of feedback that can be offered from performance assessment to site characterisation, based on SKI's most recent performance assessment project, SITE-94. SITE-94 in Sweden was an assessment of a hypothetical repository for spent nuclear fuel, based on real data gathered in the surface-based investigation of the Aespoe Hard Rock Laboratory site. Examples of feedback are given concerning quality control of data and site investigation procedures, identification of key parameters for the performance assessment, use of models for planning and evaluation of a site investigation, data sampling strategies, and guidance on future priorities for further development of site investigation methods. Because site characterisation serves multiple purposes, including provision of data for repository design and construction, it must account for and compromise among requirements from several lines of analyses in the performance assessment. (author)

  10. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  11. Fungos anamorfos (hyphomycetes da Floresta Nacional de Caxiuanã, Pará, Brasil: novos registros para o Neotrópico Anamorphic fungi (hyphomycetes from Caxiuanã National Forest, Pará, Brazil: new records for the Neotropics

    Directory of Open Access Journals (Sweden)

    Josiane Santana Monteiro

    2010-09-01

    Full Text Available Os hifomicetos são importantes decompositores e recicladores da matéria orgânica morta no ambiente e podem ser importantes patógenos de plantas e animais. Como parte do inventário da diversidade dos fungos sobre palmeiras da Amazônia Oriental, no sítio do Programa de Biodiversidade da Amazônia (PPBIO, na Floresta Nacional de Caxiuanã, Pará, foram identificados cinco novos registros de hifomicetos para o Neotrópico: Camposporium fusisporum Whitton, McKenzie & Hyde; Cylindrocarpon curtum Bugnicourt; Minimidochium microsporum Matsush.; Sporidesmiella aspera Kuthub. & Nawawi; Sporidesmium ghanaense M.B. Ellis. Stachybotrys theobromae Hansf. é citado pela primeira vez para o Brasil.The hyphomycetes are important decomposers and recyclers of dead organic matter in the environment and may be important pathogens of plants and animals. As part of the diversity inventory of palm-tree fungi from Eastern Amazonia, in Caxiuanã National Forest, Pará, five new records of hyphomycetes for the Neotropics were found: Camposporium fusisporum Whitton, McKenzie & Hyde; Cylindrocarpon curtum Bugnicourt; Minimidochium microsporum Matsush.; Sporidesmiella aspera Kuthub. & Nawawi; Sporidesmium ghanaense M.B. Ellis. Stachybotrys theobromae Hansf. is cited for the first time for Brazil.

  12. SiteFind: A software tool for introducing a restriction site as a marker for successful site-directed mutagenesis

    Directory of Open Access Journals (Sweden)

    Evans Paul M

    2005-12-01

    Full Text Available Abstract Background Site-directed mutagenesis is a widely-used technique for introducing mutations into a particular DNA sequence, often with the goal of creating a point mutation in the corresponding amino acid sequence but otherwise leaving the overall sequence undisturbed. However, this method provides no means for verifying its success other than sequencing the putative mutant construct: This can quickly become an expensive method for screening for successful mutations. An alternative to sequencing is to simultaneously introduce a restriction site near the point mutation in manner such that the restriction site has no effect on the translated amino acid sequence. Thus, the novel restriction site can be used as a marker for successful mutation which can be quickly and easily assessed. However, finding a restriction site that does not disturb the corresponding amino acid sequence is a time-consuming task even for experienced researchers. A fast and easy to use computer program is needed for this task. Results We wrote a computer program, called SiteFind, to help us design a restriction site within the mutation primers without changing the peptide sequence. Because of the redundancy of genetic code, a given peptide can be encoded by many different DNA sequences. Since the list of possible restriction sites for a given DNA sequence is not always obvious, SiteFind automates this task. The number of possible sequences a computer program must search through increases exponentially as the sequence length increases. SiteFind uses a novel "moving window" algorithm to reduce the number of possible sequences to be searched to a manageable level. The user enters a nucleotide sequence, specifies what amino acid residues should be changed in the mutation, and SiteFind generates a list of possible restriction sites and what nucleotides must be changed to introduce that site. As a demonstration of its use, we successfully generated a single point mutation

  13. Remaining Sites Verification Package for the 128-B-3 Burn Pit Site, Waste Site Reclassification Form 2006-058

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-11-17

    The 128-B-3 waste site is a former burn and disposal site for the 100-B/C Area, located adjacent to the Columbia River. The 128-B-3 waste site has been remediated to meet the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results of sampling at upland areas of the site also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  14. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  15. On multi-site damage identification using single-site training data

    Science.gov (United States)

    Barthorpe, R. J.; Manson, G.; Worden, K.

    2017-11-01

    This paper proposes a methodology for developing multi-site damage location systems for engineering structures that can be trained using single-site damaged state data only. The methodology involves training a sequence of binary classifiers based upon single-site damage data and combining the developed classifiers into a robust multi-class damage locator. In this way, the multi-site damage identification problem may be decomposed into a sequence of binary decisions. In this paper Support Vector Classifiers are adopted as the means of making these binary decisions. The proposed methodology represents an advancement on the state of the art in the field of multi-site damage identification which require either: (1) full damaged state data from single- and multi-site damage cases or (2) the development of a physics-based model to make multi-site model predictions. The potential benefit of the proposed methodology is that a significantly reduced number of recorded damage states may be required in order to train a multi-site damage locator without recourse to physics-based model predictions. In this paper it is first demonstrated that Support Vector Classification represents an appropriate approach to the multi-site damage location problem, with methods for combining binary classifiers discussed. Next, the proposed methodology is demonstrated and evaluated through application to a real engineering structure - a Piper Tomahawk trainer aircraft wing - with its performance compared to classifiers trained using the full damaged-state dataset.

  16. Nevada Test Site Environmental Report 2005, Attachment A - Site Description

    International Nuclear Information System (INIS)

    Cathy A. Wills

    2006-01-01

    This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report

  17. Nevada Test Site Environmental Report 2005, Attachment A - Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Cathy A. Wills

    2006-10-01

    This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  18. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  19. SITE-94. Site specific base data for the performance assessment

    International Nuclear Information System (INIS)

    Geier, J.; Tiren, S.; Dverstorp, B.; Glynn, P.

    1996-06-01

    This report documents the site specific base data that were available, and the utilization of these data within SITE-94. A brief summary is given of SKB's preliminary site investigations for the Aespoe Hard Rock Laboratory (HRL), which were the main source of site-specific data for SITE-94, and an overview is given of the field methods and instrumentation for the preliminary investigations. A compilation is given of comments concerning the availability and quality of the data for Aespoe, and specific recommendations are given for future site investigations. It was found that the HRL pre-investigations produced a large quantity of data which were, for the most part, of sufficient quality to be valuable for a performance assessment. However, some problems were encountered regarding documentation, procedural consistency, positional information, and storage of the data from the measurements. 77 refs, 4 tabs

  20. Quantifying siting difficulty: a case study of US transmission line siting

    Energy Technology Data Exchange (ETDEWEB)

    Vajjhala, S.P. [Resources for the Future, Washington DC (United States); Fischbeck, P.S. [Carnegie Mellon University, Pittsburgh, PA (United States). Departments of Social and Decision Sciences and Engineering and Public Policy

    2007-01-15

    The worldwide demand for new energy infrastructures has been paralleled in recent years by the increasing difficulty of siting major facilities. Siting difficulty is the subject of widespread discussion, but because of the complexity of the problem, potential solutions are not obvious or well understood. This paper presents a two-step policy-level framework that first develops an empirical measure of siting difficulty and then qualitatively assesses its major causes. The approach is based on the creation and aggregation of four siting indicators that are independent of the common causes and localized effects of siting problems. The proposed framework is demonstrated for the case of US transmission line siting. Results of the analyses reveal significant variations in state siting difficulty and industry experts' perceptions of its dominant causes, with implications for the long-term success of Regional Transmission Organizations (RTOs) and knowledge transfer among siting professionals in the deregulated industry. (author)

  1. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    International Nuclear Information System (INIS)

    Frigerio, N.A.; Habegger, L.J.; King, R.F.; Hoover, L.J.; Clark, N.A.; Cobian, J.M.

    1977-01-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability

  2. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    Energy Technology Data Exchange (ETDEWEB)

    Frigerio, N A [Environmental Impact Studies, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Habegger, L J; King, R F; Hoover, L J [Energy and Environmental Systems Division, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Clark, N A [Applied Mathematics Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Cobian, J M [Northwestern University, Evanston, Illinois 60201 (United States)

    1977-08-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability.

  3. Report of early site suitability evaluation of the potential repository site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Younker, J.L.; Andrews, W.B.; Fasano, G.A.; Herrington, C.C.; Mattson, S.R.; Murray, R.C. [Science Applications International Corp., Las Vegas, NV (United States); Ballou, L.B.; Revelli, M.A. [Lawrence Livermore National Lab., CA (United States); Ducharme, A.R.; Shephard, L.E. [Sandia National Labs., Albuquerque, NM (United States); Dudley, W.W.; Hoxie, D.T. [Geological Survey, Denver, CO (United States); Herbst, R.J.; Patera, E.A. [Los Alamos National Lab., NM (United States); Judd, B.R. [Decision Analysis Co., Portola Valley, CA (United States); Docka, J.A.; Rickertsen, L.D. [Weston Technical Associates, Washington, DC (United States)

    1992-01-01

    This study evaluated the technical suitability of Yucca Mountain, Nevada, as a potential site for a mined geologic repository for the permanent disposal of radioactive waste. The evaluation was conducted primarily to determine early in the site characterization program if there are any features or conditions at the site that indicate it is unsuitable for repository development. A secondary purpose was to determine the status of knowledge in the major technical areas that affect the suitability of the site. This early site suitability evaluation (ESSE) was conducted by a team of technical personnel at the request of the Associate Director of the US Department of Energy (DOE) Office of Geologic Disposal, a unit within the DOE`s Office of Civilian Radioactive Waste Management. The Yucca Mountain site has been the subject of such evaluations for over a decade. In 1983, the site was evaluated as part of a screening process to identify potentially acceptable sites. The site was evaluated in greater detail and found suitable for site characterization as part of the Environmental Assessment (EA) (DOE, 1986) required by the Nuclear Waste Policy Act of 1982 (NWPA). Additional site data were compiled during the preparation of the Site Characterization Plan (SCP) (DOE, 1988a). This early site suitability evaluation has considered information that was used in preparing both-documents, along with recent information obtained since the EA and SCP were published. This body of information is referred to in this report as ``current information`` or ``available evidence.``

  4. One-site versus two-site phacotrabeculectomy: a prospective randomized study

    Directory of Open Access Journals (Sweden)

    Moschos MM

    2015-08-01

    Full Text Available Marilita M Moschos,1 Irini P Chatziralli,2 Michael Tsatsos3 1First Department of Ophthalmology, University of Athens, 2Second Department of Ophthalmology, Ophthalmiatrion Athinon, Athens, Greece; 3Department of Ophthalmology, Cambridge University Hospital NHS, Cambridge, UK Purpose: The purpose of this study is to compare the efficacy and safety of one-site and two-site combined phacotrabeculectomy with foldable posterior chamber intraocular lens implantation.Methods: Thirty-four patients (41 eyes with glaucoma and cataract were randomly assigned to undergo either a one-site (22 eyes or a two-site (19 eyes combined procedure. One-site approach consisted of a standard superior phacotrabeculectomy with a limbus-based conjunctival flap, while two-site approach consisted of a clear cornea phacoemulsification and a separate superior trabeculectomy with a limbus-based conjunctival flap.Results: Mean follow-up period was 54 months (standard deviation [SD] 2.3. Mean preoperative intraocular pressure (IOP in the one-site group was 21.3 mmHg (SD 2.8 and in the two-site group was 21.8 mmHg (SD 3.0 (P>0.1. Mean postoperative IOP significantly decreased in both groups compared to the preoperative level and was 15.6 mmHg (SD 3.5 in the one-site group and 14.9 mmHg (SD 2.7 in the two-site group. Three months later, the difference between the two groups was not statistically significant (P=0.058. The one-site group required significantly more medications than the two-site group (P=0.03. Best-corrected visual acuity (BCVA improved similarly in both groups, but there was less postoperative (induced astigmatism in the two-site group in a marginal statistical level (P=0.058. Intra- and postoperative complications were comparable in the two groups.Conclusion: Both techniques yielded similar results concerning final BCVA and IOP reduction. However, the two-site group had less induced astigmatism and a better postoperative IOP control with less required

  5. Remediation management of complex sites using an adaptive site management approach.

    Science.gov (United States)

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  7. New evidence for the asthenospheric origin of the Cameroon Volcanic Line from 1D shear wave velocities

    CSIR Research Space (South Africa)

    Tokam, AP

    2013-10-01

    Full Text Available the mantle composition beneath Ethiopia and southern Brazil (Keranen et al., 2009; Julia et al., 2008). Many petrological studies of ultramafic orogenic massifs and ultramafic xenoliths along the CVL (mainly around Mount Cameroon and the Adamawa....N. and Oya, M. 2010. Petrological and chemical variability of peridotite xenoliths from the Cameroon Volcanic Line, West Africa: an evidence from Plume emplacement. Journal of Mineralogical and Petrological Sciences, 107, 57-69. McKenzie, D...

  8. Critical appraisal of the Spanner™ prostatic stent in the treatment of prostatic obstruction

    OpenAIRE

    McKenzie, Patrick; Badlani, Gopal

    2011-01-01

    Patrick McKenzie1, Gopal Badlani11Department of Urology, Wake Forest University School of Medicine, Winston-Salem NC, USAAbstract: The Spanner™ stent was first used in patients to relieve bladder outlet obstruction (BOO), and has recently been used in patients following transurethral microwave thermotherapy and men unfit for surgical intervention. We review the current literature on the role of the Spanner stent in treating prostatic obstruction compared to previously reported cases...

  9. Site locality identification study: Hanford Site. Volume II. Data cataloging

    International Nuclear Information System (INIS)

    1980-07-01

    Data compilation and cataloging for the candidate site locality identification study were conducted in order to provide a retrievable data cataloging system for the present siting study and future site evaluation and licensng processes. This task occurred concurrently with and also independently of other tasks of the candidate site locality identification study. Work in this task provided the data utilized primarily in the development and application of screening and ranking processes to identify candidate site localities on the Hanford Site. The overall approach included two steps: (1) data acquisition and screening; and (2) data compilation and cataloging. Data acquisition and screening formed the basis for preliminary review of data sources with respect to their probable utilization in the candidate site locality identification study and review with respect to the level of completeness and detail of the data. The important working assumption was that the data to be used in the study be based on existing and available published and unpublished literature. The data compilation and cataloging provided the basic product of the Task; a retrievable data cataloging system in the form of an annotated reference list and key word index and an index of compiled data. The annotated reference list and key word index are cross referenced and can be used to trace and retrieve the data sources utilized in the candidate site locality identification study

  10. Site locality identification study: Hanford Site. Volume I. Methodology, guidelines, and screening

    International Nuclear Information System (INIS)

    1980-07-01

    Presented in this report are the results of the site locality identification study for the Hanford Site using a screening process. To enable evaluation of the entire Hanford Site, the screening process was applied to a somewhat larger area; i.e., the Pasco Basin. The study consisted of a series of screening steps that progressively focused on smaller areas which are within the Hanford Site and which had a higher potential for containing suitable repository sites for nuclear waste than the areas not included for further study. Five site localities, designated H-1, H-2, H-3, H-4, H-5 (Figure A), varying in size from approximately 10 to 50 square miles, were identified on the Hanford Site. It is anticipated that each site locality may contain one or more candidate sites suitable for a nuclear waste repository. The site locality identification study began with definition of objectives and the development of guidelines for screening. Three objectives were defined: (1) maximize public health and safety; (2) minimize adverse environmental and socioeconomic impacts; and (3) minimize system costs. The screening guidelines have numerical values that provided the basis for the successive reduction of the area under study and to focus on smaller areas that had a higher likelihood of containing suitable sites

  11. Site Features

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of various site features from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times...

  12. Nevada Test Site Environmental Report 2007 Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Cathy Wills

    2008-09-01

    This appendix expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2007 (U.S. Department of Energy [DOE], 2008). Included are subsections that summarize the site's geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  13. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  14. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  15. Technical summary of groundwater quality protection program at the Savannah River Site, 1952--1986. Volume 1, Site geohydrology and waste sites

    Energy Technology Data Exchange (ETDEWEB)

    Heffner, J.D. [ed.] [Exploration Resources, Inc., Athens, GA (United States)

    1991-11-01

    This report provides information regarding the status of and groundwater quality at the waste sites at the Department of Energy`s (DOE) Savannah River Site (SRS). Specific information provided for each waste site at SRS includes its location, size, inventory (when known), and history. Many waste sites at SRS are considered to be of little environmental concern because they contain nontoxic or inert material such as construction rubble and debris. Other waste sites, however, either are known to have had an effect on groundwater quality or are suspected of having the potential to affect groundwater. Monitoring wells have been installed at most of these sites; monitoring wells are scheduled for installation at the remaining sites. Results of the groundwater analyses from these monitoring wells, presented in the appendices, are used in the report to help identify potential contaminants of concern, if any, at each waste site. The list of actions proposed for each waste site in Christensen and Gordon`s 1983 report are summarized, and an update is provided for each site. Planned actions for the future are also outlined.

  16. New Reactor Siting in Finland, Hanhikivi Site in Pyhaejoki - STUK preliminary safety assessment

    International Nuclear Information System (INIS)

    Nevalainen, Janne

    2013-01-01

    STUK has performed a preliminary assessment of the Decision-in-Principle on the Fennovoima application. A variety of factors must be considered in the selection of a site, including effects of the site on the plant design and the effects of the plant on the site environment. These include external hazards, both natural and human-induced. Since this is a new site, an extensive siting process is followed, that can include an EIA. A site survey is performed to identify candidate sites, after investigating a large region and rejecting unsuitable sites. The remaining sites are then screened and compared on the basis of safety and other considerations to select one or more preferred sites. Natural hazards include geology, seismology, hydrology and meteorology. Offshore ice will be a particular hazard for this plant, since the site is on average only 1.5 m above sea level. The design basis earthquake corresponds to a return frequency of 100,000 years, with 50 % confidence. The existing sites in southern Finland used a design peak ground acceleration of 0.1 g with the ground response spectrum maximum at 10 Hz. The candidate sites in northern Finland will require a peak ground acceleration of 0.2 g with the ground response spectrum maximum at 25 Hz

  17. Hydrogeological Site Descriptive Model - a strategy for its development during Site Investigations

    Energy Technology Data Exchange (ETDEWEB)

    Rhen, Ingvar [SWECO VIAK AB, Goeteborg (Sweden); Follin, Sven [SF GeoLogic AB, Stockholm (Sweden); Hermanson, Jan [Golder Associates, Stockholm (Sweden)

    2003-04-01

    The report is to present a strategy for the development of the Site Descriptive Hydrogeological Model within the SKB Site Investigation Programme. The report, and similar reports from the Geology, Rock Mechanics, Thermal properties, Hydrogeochemistry, Transport Properties and Surface Ecosystem disciplines are intended to guide SKB Site Descriptive Modelling but also to provide the authorities with an overview of how the modelling should be performed. Thus the objectives of this report are to: provide guidelines for the modelling of different sites resulting in consistent handling of modelling issues during the Site Investigations, provide a structure for the modelling sequence that is suitable for the establishment of a Site Descriptive model and provide some necessary details that should be considered in a Site Descriptive model.

  18. Hydrogeological Site Descriptive Model - a strategy for its development during Site Investigations

    International Nuclear Information System (INIS)

    Rhen, Ingvar; Follin, Sven; Hermanson, Jan

    2003-04-01

    The report is to present a strategy for the development of the Site Descriptive Hydrogeological Model within the SKB Site Investigation Programme. The report, and similar reports from the Geology, Rock Mechanics, Thermal properties, Hydrogeochemistry, Transport Properties and Surface Ecosystem disciplines are intended to guide SKB Site Descriptive Modelling but also to provide the authorities with an overview of how the modelling should be performed. Thus the objectives of this report are to: provide guidelines for the modelling of different sites resulting in consistent handling of modelling issues during the Site Investigations, provide a structure for the modelling sequence that is suitable for the establishment of a Site Descriptive model and provide some necessary details that should be considered in a Site Descriptive model

  19. Computer aided site management. Site use management by digital mapping

    International Nuclear Information System (INIS)

    Chupin, J.C.

    1990-01-01

    The logistics program developed for assisting the Hague site management is presented. A digital site mapping representation and geographical data bases are used. The digital site map and its integration into a data base are described. The program can be applied to urban and rural land management aid. Technical administrative and economic evaluations of the program are summarized [fr

  20. Site characterization quality assurance for the California LLRW Disposal Site Project

    International Nuclear Information System (INIS)

    Hanrahan, T.P.; Ench, J.E.; Serlin, C.L.; Bennett, C.B.

    1988-01-01

    In December of 1985 US Ecology was chosen as the license designee for the State of California's low-level radioactive waste disposal facility. In early 1987, three candidate sites were selected for characterization studies in preparation for identifying the preferred site. The geotechnical characterization activities along with studies of the ecological and archaeological attributes, as well as assessments of the socio-economic impacts and cultural resources all provide input towards selection of the proposed site. These technical studies in conjunction with comments from local citizen committees and other interested parties are used as a basis for determining the proposed site for which full site characterization as required by California licensing requirements are undertaken. The purpose of this paper is to present an overview of the program for Quality Assurance and Quality Control for the site characterization activities on the California LLRW Disposal Site Project. The focus is on three major perspectives: The composite QA Program and two of the primary characterization activities, the geotechnical and the meteorological investigations

  1. Site selection

    International Nuclear Information System (INIS)

    Olsen, C.W.

    1983-07-01

    The conditions and criteria for selecting a site for a nuclear weapons test at the Nevada Test Site are summarized. Factors considered are: (1) scheduling of drill rigs, (2) scheduling of site preparation (dirt work, auger hole, surface casing, cementing), (3) schedule of event (when are drill hole data needed), (4) depth range of proposed W.P., (5) geologic structure (faults, Pz contact, etc.), (6) stratigraphy (alluvium, location of Grouse Canyon Tuff, etc.), (7) material properties (particularly montmorillonite and CO 2 content), (8) water table depth, (9) potential drilling problems (caving), (10) adjacent collapse craters and chimneys, (11) adjacent expended but uncollapsed sites, (12) adjacent post-shot or other small diameter holes, (13) adjacent stockpile emplacement holes, (14) adjacent planned events (including LANL), (15) projected needs of Test Program for various DOB's and operational separations, and (16) optimal use of NTS real estate

  2. Site-Specific Atmospheric Dispersion Characteristics of Korean Nuclear Power Plant Sites

    International Nuclear Information System (INIS)

    Han, M. H.; Kim, E. H.; Suh, K. S.; Hwang, W. T.; Choi, Y. G.

    2001-01-01

    Site-specific atmospheric dispersion characteristics have been analyzed. The northwest and the southwest wind prevail on nuclear sites of Korea. The annual isobaric surface averaged for twenty years around Korean peninsula shows that west wind prevails. The prevailing west wind is profitable in the viewpoint of radiation protection because three of four nuclear sites are located in the east side. Large scale field tracer experiments over nuclear sites have been conducted for the purpose of analyzing the atmospheric dispersion characteristics and validating a real-time atmospheric dispersion and dose assessment system FADAS. To analyze the site-specific atmospheric dispersion characteristics is essential for making effective countermeasures against a nuclear emergency

  3. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  4. Contaminated Sites in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Sites contaminated by hazardous materials or wastes. These sites are those administered by the Contaminated Sites Section of Iowa DNR. Many are sites which are...

  5. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  6. Site Calibration report

    DEFF Research Database (Denmark)

    Yordanova, Ginka; Vesth, Allan

    The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1]. The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio...

  7. Veřejná podpora výzkumu a vývoje poskytovaná nepřímou formou v podmínkách malých a středních podniků s důrazem na informační zajištění

    OpenAIRE

    Filipová, Vladimíra

    2011-01-01

    Innovation is a critical factor of the economical development as it is the key source of a competitive advantage and brings an addend value of a concerete company (Zhang, 2O13); Technological innovation could be defined as an endogenous factor responding to economic challenges (McKenzie, 2OO8). Research and development provides innovations, whereas the production of research and development brings externalities. Externalities reduce the private return on investment as such, therefore research...

  8. Proceedings of a Workshop on the Physical Properties of Volcanic Seafloor, Held at Woods Hole, Massachusetts on April 24-26, 1990

    Science.gov (United States)

    1990-04-26

    sediment coring and heat flow survey (-* regional variation at srafloor) (suggest corridor north of Clipperton to - far enough to miss equatorial high...SAMPLE FROM SCAMOUNTS " PLATEAUS AND ASEIMIC RIDGES o OSOP SAMPLE FROM BEHIND 40 ISLAND ARCS 0 + OSOP SAMPLE OF SILL OR o MASSIVE FLOW Z 30 SOSCP SAMPLE...M. and McKenzie, D., 1987, Simple 2-D models of melt extraction at mid- ocean ridges and island arcs, Earth Planet. Sci. Lent., 83, 137-152. Verhoogen

  9. Site directed recombination

    Science.gov (United States)

    Jurka, Jerzy W.

    1997-01-01

    Enhanced homologous recombination is obtained by employing a consensus sequence which has been found to be associated with integration of repeat sequences, such as Alu and ID. The consensus sequence or sequence having a single transition mutation determines one site of a double break which allows for high efficiency of integration at the site. By introducing single or double stranded DNA having the consensus sequence flanking region joined to a sequence of interest, one can reproducibly direct integration of the sequence of interest at one or a limited number of sites. In this way, specific sites can be identified and homologous recombination achieved at the site by employing a second flanking sequence associated with a sequence proximal to the 3'-nick.

  10. Nevada National Security Site Environmental Report 2011 Attachment A: Site Description

    International Nuclear Information System (INIS)

    Wills, Cathy

    2012-01-01

    This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2011. Included are subsections that summarize the site's geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  11. Hanford Site Infrastructure Plan

    International Nuclear Information System (INIS)

    1990-01-01

    The Hanford Site Infrastructure Plan (HIP) has been prepared as an overview of the facilities, utilities, systems, and services that support all activities on the Hanford Site. Its purpose is three-fold: to examine in detail the existing condition of the Hanford Site's aging utility systems, transportation systems, Site services and general-purpose facilities; to evaluate the ability of these systems to meet present and forecasted Site missions; to identify maintenance and upgrade projects necessary to ensure continued safe and cost-effective support to Hanford Site programs well into the twenty-first century. The HIP is intended to be a dynamic document that will be updated accordingly as Site activities, conditions, and requirements change. 35 figs., 25 tabs

  12. Open-field test site

    Science.gov (United States)

    Gyoda, Koichi; Shinozuka, Takashi

    1995-06-01

    An open-field test site with measurement equipment, a turn table, antenna positioners, and measurement auxiliary equipment was remodelled at the CRL north-site. This paper introduces the configuration, specifications and characteristics of this new open-field test site. Measured 3-m and 10-m site attenuations are in good agreement with theoretical values, and this means that this site is suitable for using 3-m and 10-m method EMI/EMC measurements. The site is expected to be effective for antenna measurement, antenna calibration, and studies on EMI/EMC measurement methods.

  13. Methodology of site studies

    International Nuclear Information System (INIS)

    Caries, J.C.; Hugon, J.; Grauby, A.

    1980-01-01

    This methodology consists in an essentially dynamic, estimated and follow-up analysis of the impact of discharges on all the environment compartments, whether natural or not, that play a part in the protection of man and his environment. It applies at two levels, to wit: the choice of site, or the detailed study of the site selected. Two examples of its application will be developed, namely: at the choice of site level in the case of marine sites, and of the detailed study level of the chosen site in that of a riverside site [fr

  14. SITE: a methodology for assessment of energy facility siting patterns. Regional studies program

    International Nuclear Information System (INIS)

    Frigerio, N.A.; Habegger, L.J.; King, R.F.; Hoover, L.J.; Clark, N.A.; Cobian, J.M.

    1975-08-01

    The timely development of the nation's energy production capacity in a manner that minimizes potential adverse local and regional impacts associated with energy facilities requires the use of sophisticated techniques for evaluation of siting alternatives and fuel cycle options. This report is a documentation of the computerized SITE methodology that has been developed for evaluating health, environmental, and socioeconomic impacts related to utilization of alternate sites for energy production within a region of interest. The cost, impact, and attribute vectors, which are generated and displayed on density maps, can be used in a multiparameter overlay process to identify preferable siting areas. The assessment of clustered facilities in energy centers is also possible within the SITE analysis framework. An application of the SITE methodology to Northern Illinois is presented. Also included is a description of the ongoing extension of SITE for the accumulative evaluation of alternative regional energy siting patterns and fuel cycle options. An appendix provides documentation and user information for the SITE computer program

  15. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  16. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  17. The disposal of Canada's nuclear fuel waste: site screening and site evaluation technology

    International Nuclear Information System (INIS)

    Davison, C.C.; Brown, A.; Everitt, R.A.; Gascoyne, M.; Kozak, E.T.; Lodha, G.S.; Martin, C.D.; Soonawala, N.M.; Stevenson, D.R.; Thorne, G.A.; Whitaker, S.H.

    1994-06-01

    The concept for the disposal of Canada's nuclear fuel waste is to dispose of the waste in an underground vault, nominally at 500 m to 1000 m depth, at a suitable site in plutonic rock of the Canadian Shield. The feasibility of this concept and assessments of its impact on the environment and human health, will be documented by AECL in an Environmental Impact Statement (EIS). This report is one of nine primary references for the EIS. It describes the approach and methods that would be used during the siting stage of the disposal project to identify a preferred candidate disposal site and to confirm its suitability for constructing a disposal facility. The siting stage is divided into two distinct but closely related substages, site screening and site evaluation. Site screening would mainly involve reconnaissance investigations of siting regions of the Shield to identify potential candidate areas where suitable vault locations are likely to exist. Site screening would identify a small number of candidate areas where further detailed investigations were warranted. Site evaluation would involve progressively more detailed surface and subsurface investigations of the candidate areas to first identify potentially suitable vault locations within the candidate areas, and then characterize these potential disposal sites to identify the preferred candidate location for constructing the disposal vault. Site evaluation would conclude with the construction of exploratory shafts and tunnels at the preferred vault location, and underground characterization would be done to confirm the suitability of the preferred candidate site. An integrated program of geological, geophysical, hydrogeological, geochemical and geomechanical investigations would be implemented to obtain the geoscience information needed to assess the suitability of the candidate siting areas and candidate sites for locating a disposal vault. The candidate siting areas and candidate disposal vault sites would be

  18. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  19. Hanford Site Composite Analysis Technical Approach Description: Hanford Site Disposition Baseline.

    Energy Technology Data Exchange (ETDEWEB)

    Cobb, M. A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Dockter, R. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2017-10-02

    The permeability of ground surfaces within the U.S. Department of Energy’s (DOE) Hanford Site strongly influences boundary conditions when simulating the movement of groundwater using the Subsurface Transport Over Multiple Phases model. To conduct site-wide modeling of cumulative impacts to groundwater from past, current, and future waste management activities, a site-wide assessment of the permeability of surface conditions is needed. The surface condition of the vast majority of the Hanford Site has been and continues to be native soils vegetated with dryland grasses and shrubs.

  20. Thioredoxin binding site of phosphoribulokinase overlaps the catalytic site

    International Nuclear Information System (INIS)

    Porter, M.A.; Hartman, F.C.

    1986-01-01

    The ATP-regulatory binding site of phosphoribulokinase was studied using bromoacetylethanolamine phosphate (BrAcNHEtOP). BrAcNHEtOP binds to the active-regulatory binding site of the protein. Following trypsin degradation of the labeled protein, fragments were separated by HPLC and sequenced. (DT)

  1. Web sites that work secrets from winning web sites

    CERN Document Server

    Smith, Jon

    2012-01-01

    Leading web site entrepreneur Jon Smith has condensed the secrets of his success into 52 inspiring ideas that even the most hopeless technophobe can implement. The brilliant tips and practical advice in Web sites that work will uplift and transform any website, from the simplest to the most complicated. It deals with everything from fundamentals such as how to assess the effectiveness of a website and how to get a site listed on the most popular search engines to more sophisticated challenges like creating a community and dealing with legal requirements. Straight-talking, practical and humorou

  2. Nevada National Security Site Environmental Report 2011 Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Cathy Wills, ed.

    2012-09-12

    This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2011. Included are subsections that summarize the site's geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  3. 75 FR 879 - National Semiconductor Corporation Arlington Manufacturing Site Including On-Site Leased Workers...

    Science.gov (United States)

    2010-01-06

    ... engaged in activities related to the production of integrated circuits. The company reports that on-site... Corporation Arlington Manufacturing Site Including On-Site Leased Workers From GCA, CMPA (Silverleaf), Custom..., applicable to workers of National Semiconductor Corporation, Arlington Manufacturing Site, including on-site...

  4. 1994 Site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report.

  5. Site Specific Ground Response Analysis for Quantifying Site Amplification at A Regolith Site

    Directory of Open Access Journals (Sweden)

    Bambang Setiawan

    2017-08-01

    Full Text Available DOI: 10.17014/ijog.4.3.159-167A numerical model has demonstrated that it can simulate reasonably well earthquake motions at the ground level during a seismic event. The most widely used model is an equivalent linear approach. The equivalent linear model was used to compute the free-field response of Adelaide regolith during the 1997 Burra earthquake. The aim of this study is to quantify the amplification at the investigated site. The model computed the ground response of horizontally layered soil deposits subjected to transient and vertically propagating shear waves through a one-dimensional-soil column. Each soil layer was assumed to be homogeneous, visco-elastic, and infinite in the horizontal extent. The results of this study were compared to other studies and forward computation of the geotechnical dynamic parameters of the investigated site. The amplification triggered by the 1997 Burra seismic event was deduced. This study reveals the amplification factor up to 3.6 at the studied site.

  6. A future for nuclear sites beyond their service life. Nuclear site value development; Un avenir pour les sites nucleaires en fin de cycle. Valorisation des sites nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    As the nuclear industry moves into a new development phase, many facilities built in the fifties and sixties are reaching the end of their service life. Dismantling them and rehabilitating the sites on which they stand is a major industrial challenge which will give rise to a number of new projects. AREVA has more than 20 years' experience in these highly technical fields. As more and more sites reach the end of their service life, AREVA considers nuclear site value development as a fully-fledged industrial activity. The group's competencies in this field have been grouped together to form a dedicated entity: the Nuclear Site Value Development Business Unit, created in 2008. Several billion euros are invested in site value development projects which are far-reaching and complex, and often last for several decades. Long before work actually begins, lengthy studies and preparations are required to schedule operations, select the techniques to be used and optimize costs and deadlines. The Nuclear Site Value Development BU is currently working on four major projects involving its own facilities and those of the CEA: - La Hague: dismantling of the first generation of used fuel recycling facilities. Between 1966 and 1998, almost 5,000 tons of used fuel from graphite-moderated gas-cooled reactors, 4,500 tons of light water reactor fuel, as well as fuel from fast reactors and research reactors, were treated at UP2 400, the very first industrial recycling plant on the La Hague site. - Marcoule: first-time dismantling of a recycling plant. 1,000 rooms to be cleaned up, 30,000 tons of waste to be treated, 30 years of work. - Cadarache: first-time dismantling of a Mox fuel fabrication plant. The Cadarache plant was commissioned in 1962 to fabricate fuel for fast reactors; this was followed by MOX fuel for light water reactors, an activity which continued until the plant was shut down in 2003. - Annecy and Veurey: giving a new lease of life to former industrial sites

  7. Implementing Site-based Budgeting.

    Science.gov (United States)

    Sielke, Catherine C.

    2001-01-01

    Discusses five questions that must be answered before implementing site-based budgeting: Why are we doing this? What budgeting decisions will be devolved to the school site? How do dollars flow from the central office to the site? Who will be involved at the site? How will accountability be achieved? (Author/PKP)

  8. EPA True NO2 ground site measurements – multiple sites, TCEQ ground site measurements of meteorological and air pollution parameters – multiple sites ,GeoTASO NO2 Vertical Column

    Data.gov (United States)

    U.S. Environmental Protection Agency — EPA True NO2 ground site measurements – multiple sites - http://www-air.larc.nasa.gov/cgi-bin/ArcView/discover-aq.tx-2013; TCEQ ground site measurements of...

  9. New Site Coefficients and Site Classification System Used in Recent Building Seismic Code Provisions

    Science.gov (United States)

    Dobry, R.; Borcherdt, R.D.; Crouse, C.B.; Idriss, I.M.; Joyner, W.B.; Martin, G.R.; Power, M.S.; Rinne, E.E.; Seed, R.B.

    2000-01-01

    Recent code provisions for buildings and other structures (1994 and 1997 NEHRP Provisions, 1997 UBC) have adopted new site amplification factors and a new procedure for site classification. Two amplitude-dependent site amplification factors are specified: Fa for short periods and Fv for longer periods. Previous codes included only a long period factor S and did not provide for a short period amplification factor. The new site classification system is based on definitions of five site classes in terms of a representative average shear wave velocity to a depth of 30 m (V?? s). This definition permits sites to be classified unambiguously. When the shear wave velocity is not available, other soil properties such as standard penetration resistance or undrained shear strength can be used. The new site classes denoted by letters A - E, replace site classes in previous codes denoted by S1 - S4. Site classes A and B correspond to hard rock and rock, Site Class C corresponds to soft rock and very stiff / very dense soil, and Site Classes D and E correspond to stiff soil and soft soil. A sixth site class, F, is defined for soils requiring site-specific evaluations. Both Fa and Fv are functions of the site class, and also of the level of seismic hazard on rock, defined by parameters such as Aa and Av (1994 NEHRP Provisions), Ss and S1 (1997 NEHRP Provisions) or Z (1997 UBC). The values of Fa and Fv decrease as the seismic hazard on rock increases due to soil nonlinearity. The greatest impact of the new factors Fa and Fv as compared with the old S factors occurs in areas of low-to-medium seismic hazard. This paper summarizes the new site provisions, explains the basis for them, and discusses ongoing studies of site amplification in recent earthquakes that may influence future code developments.

  10. The site selection process

    International Nuclear Information System (INIS)

    Kittel, J.H.

    1989-01-01

    One of the most arduous tasks associated with the management of radioactive wastes is the siting of new disposal facilities. Experience has shown that the performance of the disposal facility during and after disposal operations is critically dependent on the characteristics of the site itself. The site selection process consists of defining needs and objectives, identifying geographic regions of interest, screening and selecting candidate sites, collecting data on the candidate sites, and finally selecting the preferred site. Before the site selection procedures can be implemented, however, a formal legal system must be in place that defines broad objectives and, most importantly, clearly establishes responsibilities and accompanying authorities for the decision-making steps in the procedure. Site selection authorities should make every effort to develop trust and credibility with the public, local officials, and the news media. The responsibilities of supporting agencies must also be spelled out. Finally, a stable funding arrangement must be established so that activities such as data collection can proceed without interruption. Several examples, both international and within the US, are given

  11. Site environmental programs

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.W.; Hanf, R.W.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the site environmental programs. Effluent monitoring and environmental surveillance programs monitor for impacts from operations in several areas. The first area consists of the point of possible release into the environment. The second area consists of possible contamination adjacent to DOE facilities, and the third area is the general environment both on and off the site.

  12. Site environmental programs

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Hanf, R.W.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the site environmental programs. Effluent monitoring and environmental surveillance programs monitor for impacts from operations in several areas. The first area consists of the point of possible release into the environment. The second area consists of possible contamination adjacent to DOE facilities, and the third area is the general environment both on and off the site

  13. LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, R. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-14

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  14. Inter-Site Consistency at a Multi-Site Psychiatry Clerkship

    Science.gov (United States)

    Shultes von Schlageter, Margo; Park, EunMi; Tucker, Phebe

    2006-01-01

    Objective: This study examines the effects of clinical site assignment within a multiple-site psychiatry clerkship program on the convergent outcome of the National Board of Medical Examiners (NBME) subject examination. Method: NBME scores, controlled for baseline pre-clerkship knowledge base as measured by second year human behavior scores, were…

  15. NRC staff site characterization analysis of the Department of Energy's Site Characterization Plan, Yucca Mountain Site, Nevada

    International Nuclear Information System (INIS)

    1989-08-01

    This Site Characterization Analysis (SCA) documents the NRC staff's concerns resulting from its review of the US Department of Energy's (DOE's) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation's first geologic repository for high-level radioactive waste. DOE's SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC's specific objections related to the SCP, and major comments and recommendations on the various parts of DOE's program, are presented in SCA Section 2, Director's Comments and Recommendations. Section 3 contains summaries of the NRC staff's concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE's program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC's responsibilities with respect to DOE's SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs

  16. Total number of planetary nebulae in different galaxies and the PN distance scale.

    Science.gov (United States)

    Peimbert, M.

    1990-12-01

    RESUMEN A partir de una muestra de quince galaxias se encuentra que la tasa de natalidad de nebulosas planetarias por unidad de luminosidad, , disminuye al aumentar la luminosidad y al aumentar (B - V)0. Se discuten posibles explicaciones para estos resultados. Se estima el valor de para la Galaxia y a partir de el se encuentra que el numero total de nebulosas planetarias en nuestra galaxia con R de 7200 j 1800. El valor galactico de implica que la mayorfa de las estrellas de masa intermedia pasa por la etapa de nebulosa planetaria. El valor galactico de , la tasa de mortalidad estelar por unidad de luminosidad y la tasa de natalidad de enanas blancas favorecen escalas de distancias largas para nebulosas planetarias, como la de Cudworth (1974) y la de Mallik y Peimbert (1988). ABSTRACT From a sample of fifteen galaxies it is found that the birth rate of PN per unit luminosity, , decreases with increasing luminosity and with increasing (B - V)0 possible reasons for these relationships are discussed. The value for the Galaxy is estimated and, from it, a total number of PN of 7200 # 1800 wid R < 0.64 pc is obtained. The galactic value implies that most of the intermediate mass stars go through the PN stage. The galactic value, the stellar death rate per unit luminosity and the white dwarf birth rate are in favor of long distance scales to PN like those of Cudworth (1974) and Mallik and (1988). Key wonis: NEBULAE.PLANETARY - STARS-EVOLUTION - STARS-SThLIAR STA. S

  17. Archie's Saturation Exponent for Natural Gas Hydrate in Coarse-Grained Reservoirs

    Science.gov (United States)

    Cook, Ann E.; Waite, William F.

    2018-03-01

    Accurately quantifying the amount of naturally occurring gas hydrate in marine and permafrost environments is important for assessing its resource potential and understanding the role of gas hydrate in the global carbon cycle. Electrical resistivity well logs are often used to calculate gas hydrate saturations, Sh, using Archie's equation. Archie's equation, in turn, relies on an empirical saturation parameter, n. Though n = 1.9 has been measured for ice-bearing sands and is widely used within the hydrate community, it is highly questionable if this n value is appropriate for hydrate-bearing sands. In this work, we calibrate n for hydrate-bearing sands from the Canadian permafrost gas hydrate research well, Mallik 5L-38, by establishing an independent downhole Sh profile based on compressional-wave velocity log data. Using the independently determined Sh profile and colocated electrical resistivity and bulk density logs, Archie's saturation equation is solved for n, and uncertainty is tracked throughout the iterative process. In addition to the Mallik 5L-38 well, we also apply this method to two marine, coarse-grained reservoirs from the northern Gulf of Mexico Gas Hydrate Joint Industry Project: Walker Ridge 313-H and Green Canyon 955-H. All locations yield similar results, each suggesting n ≈ 2.5 ± 0.5. Thus, for the coarse-grained hydrate bearing (Sh > 0.4) of greatest interest as potential energy resources, we suggest that n = 2.5 ± 0.5 should be applied in Archie's equation for either marine or permafrost gas hydrate settings if independent estimates of n are not available.

  18. Physical properties and rock physics models of sediment containing natural and laboratory-formed methane gas hydrate

    Science.gov (United States)

    Winters, W.J.; Pecher, I.A.; Waite, W.F.; Mason, D.H.

    2004-01-01

    This paper presents results of shear strength and acoustic velocity (p-wave) measurements performed on: (1) samples containing natural gas hydrate from the Mallik 2L-38 well, Mackenzie Delta, Northwest Territories; (2) reconstituted Ottawa sand samples containing methane gas hydrate formed in the laboratory; and (3) ice-bearing sands. These measurements show that hydrate increases shear strength and p-wave velocity in natural and reconstituted samples. The proportion of this increase depends on (1) the amount and distribution of hydrate present, (2) differences, in sediment properties, and (3) differences in test conditions. Stress-strain curves from the Mallik samples suggest that natural gas hydrate does not cement sediment grains. However, stress-strain curves from the Ottawa sand (containing laboratory-formed gas hydrate) do imply cementation is present. Acoustically, rock physics modeling shows that gas hydrate does not cement grains of natural Mackenzie Delta sediment. Natural gas hydrates are best modeled as part of the sediment frame. This finding is in contrast with direct observations and results of Ottawa sand containing laboratory-formed hydrate, which was found to cement grains (Waite et al. 2004). It therefore appears that the microscopic distribution of gas hydrates in sediment, and hence the effect of gas hydrate on sediment physical properties, differs between natural deposits and laboratory-formed samples. This difference may possibly be caused by the location of water molecules that are available to form hydrate. Models that use laboratory-derived properties to predict behavior of natural gas hydrate must account for these differences.

  19. Superfund Site Information - Site Sampling Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes Superfund site-specific sampling information including location of samples, types of samples, and analytical chemistry characteristics of...

  20. Implementing ‘Site BIM’

    DEFF Research Database (Denmark)

    Davies, Richard; Harty, Chris

    2013-01-01

    Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation...... of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM...

  1. Olkiluoto site description 2011

    International Nuclear Information System (INIS)

    2012-12-01

    This fourth version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2008 with the data and knowledge obtained up to December 2010. A descriptive model of the site (the Site Descriptive Model, SDM), i.e. a model describing the geological and hydrogeological structure of the site, properties of the bedrock and the groundwater and its flow, and the associated interacting processes and mechanisms. The SDM is divided into six parts: surface system, geology, rock mechanics, hydrogeology, hydrogeochemistry and transport properties

  2. Olkiluoto site description 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-12-15

    This fourth version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2008 with the data and knowledge obtained up to December 2010. A descriptive model of the site (the Site Descriptive Model, SDM), i.e. a model describing the geological and hydrogeological structure of the site, properties of the bedrock and the groundwater and its flow, and the associated interacting processes and mechanisms. The SDM is divided into six parts: surface system, geology, rock mechanics, hydrogeology, hydrogeochemistry and transport properties.

  3. Interns reflect: the effect of formative assessment with feedback during pre-internship

    OpenAIRE

    McKenzie, Susan; Burgess, Annette; Mellis, Craig

    2017-01-01

    Susan McKenzie,1 Annette Burgess,2 Craig Mellis1 1Central Clinical School, 2Education Office, Sydney Medical School, The University of Sydney, Sydney, NSW, Australia Background: It is widely known that the opportunity for medical students to be observed and to receive feedback on their procedural skills performance is variable in the senior years. To address this problem, we provided our Pre-Intern (PrInt) students with “one-to-one” formative feedback on their ability to p...

  4. Site Selection for Surplus Plutonium Disposition Facilities at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    2000-01-01

    A site selection study was conducted to evaluate locations for the proposed Surplus Plutonium Disposition Facilities. Facilities to be located include the Mixed Oxide (MOX) Fuel Fabrication Facility, the Pit Disassembly and Conversion Facility (PDCF), and the Plutonium Immobilization Project (PIP) facility. Objectives of the study include: (1) Confirm that the Department of Energy (DOE) selected locations for the MOX and PDCF were suitable based on selected siting criteria, (2) Recommend a site in the vicinity of F Area that is suitable for the PIP, and (3) Identify alternative suitable sites for one or more of these facilities in the event that further geotechnical characterization or other considerations result in disqualification of a currently proposed site

  5. Methods for estimating on-site ambient air concentrations at disposal sites

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1987-01-01

    Currently, Gaussian type dispersion modeling and point source approximation are combined to estimate the ambient air concentrations of pollutants dispersed downwind of an areawide emission source, using the approach of virtual point source approximation. This Gaussian dispersion modeling becomes less accurate as the receptor comes closer to the source, and becomes inapplicable for the estimation of on-site ambient air concentrations at disposal sites. Partial differential equations are solved with appropriate boundary conditions for use in estimating the on-site concentrations in the ambient air impacted by emissions from an area source such as land disposal sites. Two variations of solution techniques are presented, and their predictions are compared

  6. Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site

    Energy Technology Data Exchange (ETDEWEB)

    Daniel, Joe [Stoller Newport News Technology, Inc., Grand Junction, CO (United States); Tabor, Charles [Stoller Newport News Technology, Inc., Grand Junction, CO (United States); Survochak, Scott [U.S. Department of Energy, Office of Legacy Management, Grand Junction, CO (United States)

    2013-05-01

    The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is located in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.

  7. The Dermond vertical axis wind turbine : a suitable solution for remote sites; L'eolienne a axe vertical Dermond : une eolienne particulierement bien adaptee aux milieux isoles

    Energy Technology Data Exchange (ETDEWEB)

    Martel, P. [Genivar, Montreal, PQ (Canada); Dery, J. [Dermond Inc., Ada, MI (United States)

    2005-07-01

    A new prototype of a 100 kW truncated Darrieus type vertical axis wind turbine was put into service at the University of Quebec in Abitibi-Temiscamingue. The prototype was developed by Dermond Inc., a subsidiary of Mckenzie Bay International, and has been connected to the internal power distribution network at the University since October 2004. The Dermond turbine is well suited for isolated communities in northern Canada and is an important part of power management that competes with other small autonomous diesel powered systems. In addition to its simple and reliable mechanics, the innovative turbine is easy to install and maintain. It is omni-directional, and as such, is always oriented towards the wind. It is also equipped with an advanced electronic control system that addresses the problem of power quality in small autonomous networks. Since its installation, the prototype has met its performance targets and Dermond Inc. plans to market a new 200 kW wind turbine in 2006 with improved characteristics. Dermond Inc. is confident that this technology can penetrate the markets of remote areas, including northern communities and islands. This paper described the origins of the vertical axis technology and how Dermond Inc. improved upon it to include the possibility of integrating other energy sources or energy storage for additional power gains. 8 figs.

  8. Expedited Site Characterization: A rapid, cost-effective process for preremedial site characterization

    International Nuclear Information System (INIS)

    Burton, J.C.; Walker, J.L.; Jennings, T.V.; Aggarwal, P.K.; Hastings, B.; Meyer, W.T.; Rose, C.M.; Rosignolo, C.L.

    1993-01-01

    Argonne National Laboratory has developed a unique, cost- and time-effective, technically innovative process for preremedial site characterization, referred to as Expedited Site Characterization (ESC). The cost of the ESC field sampling process ranges from 1/10 to 1/5 of the cost of traditional site characterization. The time required for this ESC field activity is approximately 1/30 of that for current methods. Argonne's preremedial site investigations based on this approach have been accepted by the appropriate regulatory agencies. The ESC process is flexible and neither site nor contaminant dependent. The process has been successfully tested and applied in site investigations of multiple contaminated landfills in New Mexico (for the US Department of the Interior's Bureau of Land Management [BLM]) and at former grain storage facilities in Nebraska and Kansas, contaminated with carbon tetrachloride (for the Department of Agriculture's Commodity Credit Corporation [CCC/USDA]). A working demonstration of this process was sponsored by the US Department of Energy (DOE) Office of Technology Development as a model of the methodology needed to accelerate site characterizations at DOE facilities. This report describes the application of the process in New Mexico, Nebraska and Kansas

  9. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  10. Searching your site`s management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, W.; Rollin, C. [S.M. Stoller Corp., Boulder, CO (United States)

    1994-12-31

    The Department of Energy`s guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort.

  11. Application of the Integrated Site and Environment Data Management System for LILW Disposal Site

    International Nuclear Information System (INIS)

    Lee, Ji Hoon; Lee, Eun Yong; Kim, Chang Lak

    2007-01-01

    During the last five years, Site Information and Total Environmental data management System(SITES) has been developed. SITES is an integrated program for overall data acquisition, environmental monitoring, and safety analysis. SITES is composed of three main modules, such as site database system (SECURE), safety assessment system (SAINT) and environmental monitoring system (SUDAL). In general, for the safe management of radioactive waste repository, the information of site environment should be collected and managed systematically from the initial site survey. For this, SECURE module manages its data for the site characterization, environmental information, and radioactive environmental information etc. The purpose of SAINT module is to apply and analyze the data from SECURE. SUDAL is developed for environmental monitoring of the radioactive waste repository. Separately, it is ready to open to the public for offering partial information

  12. Nevada Test Site Environmental Report 2009, Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Cathy Wills, ed.

    2010-09-13

    This attachment expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2009. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  13. Ocean Disposal Site Monitoring

    Science.gov (United States)

    EPA is responsible for managing all designated ocean disposal sites. Surveys are conducted to identify appropriate locations for ocean disposal sites and to monitor the impacts of regulated dumping at the disposal sites.

  14. Site characterization criteria (DOE-STD-1022-94) for natural phenomena hazards at DOE sites

    International Nuclear Information System (INIS)

    Chen, J.C.; Ueng, T.S.; Boissonnade, A.C.

    1995-12-01

    This paper briefly summarizes requirements of site characterization for Natural Phenomena Hazards (NPH) at DOE sites. In order to comply with DOE Order 5480.28, site characterization criteria has been developed to provide site-specific information needed for development of NPH assessment criteria. Appropriate approaches are outlined to ensure that the current state-of-the-art methodologies and procedures are used in the site characterization. General and detailed site characterization requirements are provided in the areas of meteorology, hydrology, geology, seismology and geotechnical studies

  15. Non-Invasive Seismic Methods for Earthquake Site Classification Applied to Ontario Bridge Sites

    Science.gov (United States)

    Bilson Darko, A.; Molnar, S.; Sadrekarimi, A.

    2017-12-01

    How a site responds to earthquake shaking and its corresponding damage is largely influenced by the underlying ground conditions through which it propagates. The effects of site conditions on propagating seismic waves can be predicted from measurements of the shear wave velocity (Vs) of the soil layer(s) and the impedance ratio between bedrock and soil. Currently the seismic design of new buildings and bridges (2015 Canadian building and bridge codes) requires determination of the time-averaged shear-wave velocity of the upper 30 metres (Vs30) of a given site. In this study, two in situ Vs profiling methods; Multichannel Analysis of Surface Waves (MASW) and Ambient Vibration Array (AVA) methods are used to determine Vs30 at chosen bridge sites in Ontario, Canada. Both active-source (MASW) and passive-source (AVA) surface wave methods are used at each bridge site to obtain Rayleigh-wave phase velocities over a wide frequency bandwidth. The dispersion curve is jointly inverted with each site's amplification function (microtremor horizontal-to-vertical spectral ratio) to obtain shear-wave velocity profile(s). We apply our non-invasive testing at three major infrastructure projects, e.g., five bridge sites along the Rt. Hon. Herb Gray Parkway in Windsor, Ontario. Our non-invasive testing is co-located with previous invasive testing, including Standard Penetration Test (SPT), Cone Penetration Test and downhole Vs data. Correlations between SPT blowcount and Vs are developed for the different soil types sampled at our Ontario bridge sites. A robust earthquake site classification procedure (reliable Vs30 estimates) for bridge sites across Ontario is evaluated from available combinations of invasive and non-invasive site characterization methods.

  16. DOE site performance assessment activities

    International Nuclear Information System (INIS)

    1990-07-01

    Information on performance assessment capabilities and activities was collected from eight DOE sites. All eight sites either currently dispose of low-level radioactive waste (LLW) or plan to dispose of LLW in the near future. A survey questionnaire was developed and sent to key individuals involved in DOE Order 5820.2A performance assessment activities at each site. The sites surveyed included: Hanford Site (Hanford), Idaho National Engineering Laboratory (INEL), Los Alamos National Laboratory (LANL), Nevada Test Site (NTS), Oak Ridge National Laboratory (ORNL), Paducah Gaseous Diffusion Plant (Paducah), Portsmouth Gaseous Diffusion Plant (Portsmouth), and Savannah River Site (SRS). The questionnaire addressed all aspects of the performance assessment process; from waste source term to dose conversion factors. This report presents the information developed from the site questionnaire and provides a comparison of site-specific performance assessment approaches, data needs, and ongoing and planned activities. All sites are engaged in completing the radioactive waste disposal facility performance assessment required by DOE Order 5820.2A. Each site has achieved various degrees of progress and have identified a set of critical needs. Within several areas, however, the sites identified common needs and questions

  17. Nevada Test Site Environmental Report 2006 and Site Description (Volume 1)

    Energy Technology Data Exchange (ETDEWEB)

    Cathy Wills

    2007-10-01

    The Nevada Test Site Environmental Report 2006 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec). This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of nonradiological releases, implementation status of the NTS Environmental Management System, a summary of compliance with environmental regulations, pollution prevention and waste minimization accomplishments, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled Nevada Test Site Environmental Report Summary 2006 produced to be a more cost-effective means of distributing information contained in the NTSER to interested DOE stakeholders.

  18. Site selection - siting of the final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-03-01

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  19. Site selection - siting of the final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  20. Nevada Test Site Environmental Report 2006 and Site Description (Volume 1)

    International Nuclear Information System (INIS)

    Cathy Wills

    2007-01-01

    The Nevada Test Site Environmental Report 2006 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec). This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of nonradiological releases, implementation status of the NTS Environmental Management System, a summary of compliance with environmental regulations, pollution prevention and waste minimization accomplishments, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled Nevada Test Site Environmental Report Summary 2006 produced to be a more cost-effective means of distributing information contained in the NTSER to interested DOE stakeholders

  1. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  2. Site-Specific Seismic Site Response Model for the Waste Treatment Plant, Hanford, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Rohay, Alan C.; Reidel, Steve P.

    2005-02-24

    This interim report documents the collection of site-specific geologic and geophysical data characterizing the Waste Treatment Plant site and the modeling of the site-specific structure response to earthquake ground motions.

  3. Technical know-how of site descriptive modeling for site characterization - 59089

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Doke, Ryosuke; Niizato, Tadafumi; Yasue, Ken-ichi

    2012-01-01

    The site descriptive model covering the current status of characteristics of geological environment and the site evolution model for estimation of the long-term evolution of site conditions are used to integrate multi-disciplinary investigation results. It is important to evaluate uncertainties in the models, to specify issues regarding the uncertainties and to prioritize the resolution of specified issues, for the planning of site characterization. There is a large quantity of technical know-how in the modeling process. It is important to record the technical know-how with transparency and traceability, since site characterization projects generally need long duration. The transfer of the technical know-how accumulated in the research and development (R and D) phase to the implementation phase is equally important. The aim of this study is to support the planning of initial surface-based site characterizations based on the technical know-how accumulated from the underground research laboratory projects. These projects are broad scientific studies of the deep geological environment and provide a technical basis for the geological disposal of high-level radioactive wastes. In this study, a comprehensive task flow from acquisition of existing data to planning of field investigations through the modeling has been specified. Specific task flow and decision-making process to perform the tasks have been specified. (authors)

  4. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  5. Site enforcement tracking system (SETS): PRP listing by site for region 9

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  6. Site enforcement tracking system (SETS): PRP listing by site for region 8

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  7. Site enforcement tracking system (SETS): PRP listing by site for region 10

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  8. Site enforcement tracking system (SETS): PRP listing by site for region 3

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  9. Site enforcement tracking system (SETS): PRP listing by site for region 2

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  10. Site enforcement tracking system (SETS): PRP listing by site for region 5

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  11. Site enforcement tracking system (SETS): PRP listing by site for region 6

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  12. Nuclear site selection studies

    International Nuclear Information System (INIS)

    Gharib, A.; Zohoorian Izadpanah, A.A.; Iranmanesh, H.

    2000-01-01

    It is of special importance, especially from the nuclear safety viewpoint, to select suitable sites for different nuclear structures with the considered future activities. Site selection sometimes involves high costs not necessarily for merely selecting of site but for some preliminary measures to be taken so as the site may have the necessary characteristics. The more suitable the natural characteristics of the site for the considered project, the more successful and efficient the project, the lower the project costs and the longer the project operation period. If so, the project will cause the growth of public culture and sustainable socioeconomic development. This paper is the result of the conclusion of numerous massive reports of this activity in the preliminary phase based on theories, practices and the related safety principles on this ground as well as the application of data and information of the past and a glance to the future. The conception of need for a site for medium structures and nuclear research projects and how to perform this process are presented step by step here with a scientific approach to its selection during the investigations. In this study, it is practically described how the site is selected, by determining and defining the characteristics of research and nuclear projects with medium structures and also its fitting to the optimum site. The discovered sites typically involve the best advantages in technical and economic aspects and no particular contrast with the concerned structures

  13. Promoting Your Web Site.

    Science.gov (United States)

    Raeder, Aggi

    1997-01-01

    Discussion of ways to promote sites on the World Wide Web focuses on how search engines work and how they retrieve and identify sites. Appropriate Web links for submitting new sites and for Internet marketing are included. (LRW)

  14. Site selection handbook: Workshop on site selection for low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    1987-10-01

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) requires the Department of Energy (DOE) to provide technical assistance to ''...those compact regions, host States and nonmember States determined by the Secretary to require assistance.'' Technical assistance has been defined to include, but not be limited to, ''technical guidelines for site selection.'' This site selection workshop was developed to assist States and Compacts in developing new low-level radioactive waste (LLW) disposal sites in accordance with the requirements of the LLRWPAA. The workshop comprises a series of lectures, discussion topics, and exercises, supported by this Site Selection Workshop Handbook, designed to examine various aspects of a comprehensive site selection program. It is not an exhaustive treatment of all aspects of site selection, nor is it prescriptive. The workshop focuses on the major elements of site selection and the tools that can be used to implement the site selection program

  15. The voluntary siting process: The solution to siting in the Northeast Compact

    International Nuclear Information System (INIS)

    Deshais, J.B.

    1995-01-01

    The date: June 10, 1991. The decision: the announcement of three 'candidate sites' for a low-level radioactive waste (LLRW) facility in Connecticut following statewide screening. The debate: the right of the citizens of the state to refuse to have this type of facility in their 'backyard' versus the State's responsibility to provide for the safe management of LLRW generated within its borders. The debacle: vigorous opposition, political involvement, no opportunity for effective dialogue with the candidate towns. The end: a legislative mandate to terminate the siting process. This series of events, familiar to those in the business of attempting to site and develop unwanted and unwelcome facilities, would have thwarted efforts to provide for disposal capacity in the Northeast Compact region. Connecticut's efforts to site a LLRW disposal facility pursuant to a traditional 'decide-announce-defend' approach had apparently failed. New Jersey, its partner in the Compact, was also ready to proceed with a similar process that would lead to the naming of several candidate sites, but suspended its efforts to review other siting alternatives. The problem: a new approach was needed. The answer: both states would pursue voluntary siting for the LLRW facilities. The result: the best chance for successful development of LLRW disposal capacity in the Northeast Compact region

  16. Site Selection for the Salt Disposition Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    Gladden, J.B.; Rueter, K.J.; Morin, J.P.

    2000-01-01

    A site selection study was conducted to identify a suitable location for the construction and operation of a new Salt Disposition Facility (SDF) at the Savannah River Site (SRS). The facility to be sited is a single processing facility and support buildings that could house either of three technology alternatives being developed by the High Level Waste Systems Engineering Team: Small Tank Tetraphenylborate Precipitation, Crystalline Silicotitanate Non-Elutable Ion Exchange or Caustic Side Solvent Extraction. A fourth alternative, Direct Disposal in grout, is not part of the site selection study because a location has been identified that is unique to this technology (i.e., Z-Area). Facility site selection at SRS is a formal, documented process that seeks to optimize siting of new facilities with respect to facility-specific engineering requirements, sensitive environmental resources, and applicable regulatory requirements. In this manner, the prime objectives of cost minimization, environmental protection, and regulatory compliance are achieved. The results from this geotechnical characterization indicated that continued consideration be given to Site B for the proposed SDF. Suitable topography, the lack of surface hydrology and floodplain issues, no significant groundwater contamination, the presence of minor soft zones along the northeast portion of footprint, and no apparent geological structure in the Gordon Aquitard support this recommendation

  17. Facility siting as a decision process at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    1995-01-01

    Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating a facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts

  18. Site Environmental Report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, ``General Environmental Protection Program.`` This 1993 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in the Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here.

  19. Particle Physics Education Sites

    Science.gov (United States)

    back to home page Particle Physics Education Sites quick reference Education and Information - National Laboratory Education Programs - Women and Minorities in Physics - Other Physics Sites - Physics Alliance - Accelerators at National Laboratories icon Particle Physics Education and Information sites: top

  20. Site Area Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of site boundaries from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  1. Description of the Northwest hazardous waste site data base and preliminary analysis of site characteristics

    International Nuclear Information System (INIS)

    Woodruff, D.L.; Hartz, K.E.; Triplett, M.B.

    1988-08-01

    The Northwest Hazardous Waste RD and D Center (the Center) conducts research, development, and demonstration (RD and D) activities for hazardous and radioactive mixed-waste technologies applicable to remediating sites in the states of Idaho, Montana, Oregon, and Washington. To properly set priorities for these RD and D activities and to target development efforts it is necessary to understand the nature of the sites requiring remediation. A data base of hazardous waste site characteristics has been constructed to facilitate this analysis. The data base used data from EPA's Region X Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) and from Preliminary Assessment/Site Investigation (PA/SI) forms for sites in Montana. The Center's data base focuses on two sets of sites--those on the National Priorities List (NPL) and other sites that are denoted as ''active'' CERCLIS sites. Active CERCLIS sites are those sites that are undergoing active investigation and analysis. The data base contains information for each site covering site identification and location, type of industry associated with the site, waste categories present (e.g., heavy metals, pesticides, etc.), methods of disposal (e.g., tanks, drums, land, etc.), waste forms (e.g., liquid, solid, etc.), and hazard targets (e.g., surface water, groundwater, etc.). As part of this analysis, the Northwest region was divided into three geographic subregions to identify differences in disposal site characteristics within the Northwest. 2 refs., 18 figs., 5 tabs

  2. Nevada Test Site Environmental Report 2008 Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Cathy A. Wills

    2009-09-01

    This attachment expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2008 (National Security Technologies, LLC [NSTec], 2009a). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  3. Subsurface characterization and geohydrologic site evaluation West Chestnut Ridge site

    International Nuclear Information System (INIS)

    1984-01-01

    The West Chestnut Ridge Site at the Oak Ridge National Laboratory is being considered for use as a repository for low-level radioactive waste. The purposes of this study were to provide a geohydrological characterization of the site for use in pathways analysis, and to provide preliminary geotechnical recommendations that would be used for development of a site utilization plan. Subsurface conditions were investigated at twenty locations and observation wells were installed. Field testing at each location included the Standard Penetration Test and permeability tests in soil and rock. A well pumping test was ocmpleted at one site. Laboratory testing included permeability, deformability, strength and compaction tests, as well as index and physical property tests. The field investigations showed that the subsurface conditions include residual soil overlying a weathered zone of dolomite which grades into relatively unweathered dolomite at depth. The thickness of residual soil is typically 80 ft (24 m) on the ridges, but can be as little as 10 ft (3 m) in the valleys. Trench excavations to depths of 30 ft (9 m) should not present serious slope stability problems above the water table. On-site soils can be used for liners or trench backfill but these soils may require moisture conditioning to achieve required densities. 19 figures, 8 tables

  4. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  5. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  6. Small Wind Site Assessment Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Tim [Advanced Energy Systems LLC, Eugene, OR (United States); Preus, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    Site assessment for small wind energy systems is one of the key factors in the successful installation, operation, and performance of a small wind turbine. A proper site assessment is a difficult process that includes wind resource assessment and the evaluation of site characteristics. These guidelines address many of the relevant parts of a site assessment with an emphasis on wind resource assessment, using methods other than on-site data collection and creating a small wind site assessment report.

  7. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  8. NPL Site Locations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  9. NPL Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  10. Nevada Test Site annual site environmental report, 1989

    Energy Technology Data Exchange (ETDEWEB)

    Wruble, D T; McDowell, E M [eds.

    1990-11-01

    Prior to 1989 annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the US Department of Energy, Nevada Operations Office (DOE/NV). Results of the offsite radiological surveillance program conducted by the US Environmental Protection Agency (EPA), Environmental Monitoring Systems Laboratory, Las Vegas, Nevada, were reported separately by that Agency. Beginning with this 1989 annual Site environmental report for the NTS, these two documents are being combined into a single report to provide a more comprehensive annual documentation of the environmental protection program conducted for the nuclear testing program and other nuclear and non-nuclear activities at the Site. The two agencies have coordinated preparation of this combined onsite and offsite report through sharing of information on environmental releases and meteorological, hydrological, and other supporting data used in dose-estimate calculations. 57 refs., 52 figs., 65 tabs.

  11. Development and Application of SITES

    International Nuclear Information System (INIS)

    Park, Jo Wan; Yoon; Yoon, Jeong Hyoun; Kim, Chank Lak; Cho, Sung IL

    2008-01-01

    SITES (Site Information and Total Environmental Data Management System) has been developed for the purpose of systematically managing site characteristics and environmental data produced during the pre-operational, operational, and post-closure phases of a radioactive waste disposal facility. SITES is an integration system, which consists of 4 modules, to be available for maintenance of site characteristics data, for safety assessment, and for site/environment monitoring; site environmental data management module (SECURE), integrated safety assessment module (SAINT), site/environment monitoring module (SUDAL) and geological information module for geological data management (SITES-GIS). Each module has its database with the functions of browsing, storing, and reporting data and information. Data from SECURE and SUDAL are interconnected to be utilized as inputs to SAINT. SAINT has the functions that multi-user can access simultaneously via client-server system, and the safety assessment results can be managed with its embedded Quality Assurance feature. Comparison between assessment results and environmental monitoring data can be made and visualized in SUDAL and SITES-GIS. Also, SUDAL is designed that the periodic monitoring data and information could be opened to the public via internet homepage. SITES has applied to the Wolsong low- and intermediate-level radioactive waste disposal center in Korea, and is expected to enhance the function of site/environment monitoring in other nuclear-related facilities and also in industrial facilities handling hazardous materials.

  12. 2016 Inspection and Annual Site Status Report for the Site A/Plot M, Illinois, Decommissioned Reactor Site July 2016

    Energy Technology Data Exchange (ETDEWEB)

    Murl, Jeffrey [USDOE Office of Legacy Management, Washington, DC (United States); Miller, Michele [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-07-01

    The Site A/Plot M, Illinois, Decommissioned Reactor Site was inspected on May 17, 2016. The site, located within Cook County forest preserve that is open to the public, was found to be in good condition with one exception. Erosion on top of the grass-covered mound at Plot M continues to be a concern as presented in previous inspections. Ruts form in the soil on top of Plot M as a result of bike traffic using the open field as a pass thru between established bike trails within the forest preserve. Argonne National Laboratory (ANL) who is contracted directly from U.S. Department of Energy (DOE) has filled in the ruts with top soil and reseeding remains an ongoing process. Reseeded areas from 2015 are progressing nicely. No cause for a follow-up inspection was identified. In 2015, ANL plugged and abandoned 8 of 25 monitoring wells (BH41, BH51, BH52, BH54, DH9, DH10, DH13, and DH17). The 17 groundwater monitoring wells remaining at the site were inspected to confirm that they were locked and in good condition. Preliminary environmental monitoring results for 2015 are provided in a draft report titled Surveillance of Site A and Plot M, Report for 2015, prepared by ANL. The report also contains results of an independent analysis conducted by the Illinois Emergency Management Agency on some of the samples collected by ANL in 2015. The draft report states that the results of the surveillance program continue to indicate that the impact of radioactivity at Site A/Plot M is very low and does not endanger the health of those living in the area or visiting the site. The ANL monitoring report will be made available to the public on the DOE Office of Legacy Management public website when it is issued as final. A new county forest preserve campsite opened in 2015 at Bull Frog Lake, which is east of Plot M. Hiking trails connect Bull Frog Lake with Site A/Plot M. The site might receive more traffic from forest preserve visitors now that this new campsite is opened.

  13. Site investigations: Strategy for rock mechanics site descriptive model

    International Nuclear Information System (INIS)

    Andersson, Johan; Christiansson, Rolf; Hudson, John

    2002-05-01

    As a part of the planning work for the Site Investigations, SKB has developed a Rock Mechanics Site Descriptive Modelling Strategy. Similar strategies are being developed for other disciplines. The objective of the strategy is that it should guide the practical implementation of evaluating site specific data during the Site Investigations. It is also understood that further development may be needed. This methodology enables the crystalline rock mass to be characterised in terms of the quality at different sites, for considering rock engineering constructability, and for providing the input to numerical models and performance assessment calculations. The model describes the initial stresses and the distribution of deformation and strength properties of the intact rock, of fractures and fracture zones, and of the rock mass. The rock mass mechanical properties are estimated by empirical relations and by numerical simulations. The methodology is based on estimation of mechanical properties using both empirical and heroretical/numerical approaches; and estimation of in situ rock stress using judgement and numerical modelling, including the influence of fracture zones. These approaches are initially used separately, and then combined to produce the required characterisation estimates. The methodology was evaluated with a Test Case at the Aespoe Hard Rock Laboratory in Sweden. The quality control aspects are an important feature of the methodology: these include Protocols to ensure the structure and coherence of the procedures used, regular meetings to enhance communication, feedback from internal and external reviewing, plus the recording of an audit trail of the development steps and decisions made. The strategy will be reviewed and, if required, updated as appropriate

  14. Site investigations: Strategy for rock mechanics site descriptive model

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Hudson, John [Rock Engineering Consultants, Welwyn Garden City (United Kingdom)

    2002-05-01

    As a part of the planning work for the Site Investigations, SKB has developed a Rock Mechanics Site Descriptive Modelling Strategy. Similar strategies are being developed for other disciplines. The objective of the strategy is that it should guide the practical implementation of evaluating site specific data during the Site Investigations. It is also understood that further development may be needed. This methodology enables the crystalline rock mass to be characterised in terms of the quality at different sites, for considering rock engineering constructability, and for providing the input to numerical models and performance assessment calculations. The model describes the initial stresses and the distribution of deformation and strength properties of the intact rock, of fractures and fracture zones, and of the rock mass. The rock mass mechanical properties are estimated by empirical relations and by numerical simulations. The methodology is based on estimation of mechanical properties using both empirical and heroretical/numerical approaches; and estimation of in situ rock stress using judgement and numerical modelling, including the influence of fracture zones. These approaches are initially used separately, and then combined to produce the required characterisation estimates. The methodology was evaluated with a Test Case at the Aespoe Hard Rock Laboratory in Sweden. The quality control aspects are an important feature of the methodology: these include Protocols to ensure the structure and coherence of the procedures used, regular meetings to enhance communication, feedback from internal and external reviewing, plus the recording of an audit trail of the development steps and decisions made. The strategy will be reviewed and, if required, updated as appropriate.

  15. Site decommissioning management plan

    International Nuclear Information System (INIS)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff's strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites

  16. Site decommissioning management plan

    Energy Technology Data Exchange (ETDEWEB)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  17. Geo-Proxy-Based Site Classification for Regional Zonation of Seismic Site Effects in South Korea

    Directory of Open Access Journals (Sweden)

    Chang-Guk Sun

    2018-02-01

    Full Text Available Seismic site effects and topographic effects related to ground motion occur during an earthquake due to site-specific geotechnical or geological characteristics, including the geological or geographical structure and the characteristics of near-surface sub-soil layers. Site-specific site effects due to geological conditions have been confirmed in recent earthquake events. Earthquake-induced damage has mainly occurred at accumulated soft soil layers under basins or along coasts and rivers. An alternative method has recently been proposed for evaluating regional seismic site effects and amplification factors using digital elevation models (DEM. High-quality DEMs at high resolutions may be employed to resolve finer-scale variations in topographic gradients and consequently, correlated site response parameters. Because there are many regions in South Korea lacking borehole datasets, which are insufficient for site classification only using borehole datasets, a DEM-based proxy for seismic zonation can be effective. Thus, in this study, geo-proxy-based site classification was proposed based on empirical correlations with site response parameters and conducted for regional zonation of seismic site effects to identify the amplification of characteristics in the western metropolitan areas of South Korea, depending on the site-specific geo-spatial conditions.

  18. Session II-A. Site characterization

    International Nuclear Information System (INIS)

    McIntosh, W.

    1981-01-01

    Section II-A on Site Characterization consists of the following papers which describe the progress made during the past fiscal year toward identifying sites for high-level radioactive waste repositories in deep geologic formations: (1) progress in expanded studies for repository sites; (2) evaluation of geologic and hydrologic characteristics in the Basin and Range Province relative to high-level nuclear waste disposal; (3) siting progress: Permian region; (4) Paradox Basin site exploration: a progress report; (5) progress toward recommending a salt site for an exploratory shaft; (6) status of geologic investigations for nuclear waste disposal at the Nevada Test Site; (7) geohydrologic investigation of the Hanford Site, Washington: basalt waste isolation project. Highlights include: expanding studies in crystalline rocks, both in the Appalachian and Lake Superior regions; laying the ground work with the states in the Basin and Range Province to kick off a joint USGS-state province study; narrowing areas of the Permian and Paradox bedded salt regions to a few promising locations; issuing a Gulf Coast Salt Dome Evaluation report (ONWI-109) for public review and comment; narrowing the Nevada Test Site area and Hanford Site area to locations for detailed site investigations and exploratory shafts; progress in developing the subseabed and space disposals alternatives

  19. 1994 Site environmental report

    International Nuclear Information System (INIS)

    1995-07-01

    The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report

  20. Report of early site suitability evaluation of the potential repository site at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Younker, J.L.; Andrews, W.B.; Fasano, G.A.; Herrington, C.C.; Mattson, S.R.; Murray, R.C.; Ballou, L.B.; Revelli, M.A.; Ducharme, A.R.; Shephard, L.E.; Dudley, W.W.; Hoxie, D.T.; Herbst, R.J.; Patera, E.A.; Judd, B.R.; Docka, J.A.; Rickertsen, L.D.

    1992-01-01

    This study evaluated the technical suitability of Yucca Mountain, Nevada, as a potential site for a mined geologic repository for the permanent disposal of radioactive waste. The evaluation was conducted primarily to determine early in the site characterization program if there are any features or conditions at the site that indicate it is unsuitable for repository development. A secondary purpose was to determine the status of knowledge in the major technical areas that affect the suitability of the site. This early site suitability evaluation (ESSE) was conducted by a team of technical personnel at the request of the Associate Director of the US Department of Energy (DOE) Office of Geologic Disposal, a unit within the DOE's Office of Civilian Radioactive Waste Management. The Yucca Mountain site has been the subject of such evaluations for over a decade. In 1983, the site was evaluated as part of a screening process to identify potentially acceptable sites. The site was evaluated in greater detail and found suitable for site characterization as part of the Environmental Assessment (EA) (DOE, 1986) required by the Nuclear Waste Policy Act of 1982 (NWPA). Additional site data were compiled during the preparation of the Site Characterization Plan (SCP) (DOE, 1988a). This early site suitability evaluation has considered information that was used in preparing both-documents, along with recent information obtained since the EA and SCP were published. This body of information is referred to in this report as ''current information'' or ''available evidence.''

  1. Drupal 7 Multilingual Sites

    CERN Document Server

    Pol, Kristen

    2012-01-01

    A practical book with plenty of screenshots to guide you through the many features of multilingual Drupal. A demo ecommerce site is provided if you want to practice on a sample site, although you can apply the techniques learnt in the book directly to your site too. Any Drupal users who know the basics of building a Drupal site and are familiar with the Drupal UI, will benefit from this book. No previous knowledge of localization or internationalization is required.

  2. Site Response Analysis Using DeepSoil: Case Study of Bangka Site, Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Iswanto, Eko Rudi; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    Indonesia government declared through Act No. 17 year 2007 on the National Long-Term Development Plant Year 2005-2025 and Presidential Decree No. 5 year 2006 on the National Energy Policy (Indonesia 2007; Indonesia 2006), that nuclear energy is stated as a part of the national energy system. In order to undertake the above national policy, National Nuclear Energy Agency of Indonesia, as the promotor for the utilization of nuclear energy will conduct site study, which is a part of infrastructure preparation for NPP construction. Thorough preparation and steps are needed to operate an NPP and it takes between 10 to 15 years from the preliminary study (site selection, financial study, etc.) up to project implementation (manufacturing, construction, commissioning). During project implementation, it is necessary to prepare various documents relevant for permit application such as Safety Evaluation Report for site permit, Preliminary Safety Analysis Report and Environment Impact Assessment Report for construction permit. Considering the continuously increasing electricity energy demand, it is necessary to prepare for alternative NPP sites. The safety requirements of NPP's are stringent; amongst the various requirements is the ability to safely shut down in the wake of a possible earthquake. Ground response analysis of a potential site therefore needs to be carried out, parameter that affect the resistance of an NPP to earthquakes such as peak strain profiles is analysed. The objective of this paper is to analyse the ground response of the selected site for a NPP, using The Mw 7.9 in Sikuai Island, West Sumatra on September 12, 2007 as present input motion. This analysis will be carried out using a ground response analysis program, DeepSoil. In addition to this, an attempt was made to define the site specific input motion characteristics of the selected site for use in DeepSoil (DeepSoil 5.0). A site investigation at the WB site was performed primarily on the PS

  3. Assessment of candidate sites for disposal of treated effluents at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Davis, J.D.

    1992-01-01

    A rigidly defined evaluation process was used to recommend a preferred location to dispose of treated effluents from facilities in the 200 Areas of the US Department of Energy's Hanford Site in Washington State. First, siting constraints were defined based on functional design considerations and siting guidelines. Then, criteria for selecting a preferred site from among several candidates were identified and their relative importance defined. Finally, the weighted criteria were applied and a site was selected for detailed characterization by subsurface investigations

  4. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  5. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — National Priorities List (NPL) Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  6. Bald eagle site management plan for the Hanford Site, south-central Washington

    International Nuclear Information System (INIS)

    Fitzner, R.F.; Weiss, S.G.

    1994-12-01

    The CERCLA remedial investigations of waste sites on the Hanford Site will involve lands containing or adjacent to a bald eagle nest, winter concentration areas, or communal night roost. Because these CERCLA investigations may affect bald eagles, the DOE has prepared this Bald Eagle Site Management Plan (BESMP). However, it is intended that this BESMP be used or updated so as to be also applicable to future activities that affect bald eagles on the Hanford Site. Bald eagles regularly use the US Department of Energy's (DOE) Hanford Site in south-central Washington State during winter months for roosting, perching, and foraging. Each of these activities requires buffer zones to protect eagles from human disturbances. Buffer zones developed in this plan follow recommended guidelines and are intended to be used in planning. If Hanford Site activities in the vicinity of identified bald eagle use areas are carried out in accordance with this plan, such actions are not likely to adversely affect the eagles or their habitat. Activities that may be exceptions will involve informal or formal (whichever is appropriate) consultation with the US Fish and Wildlife Service as required by the Endangered Species Act

  7. Accounting for Framing-Effects - an informational approach to intensionality in the Bolker-Jeffrey decision model

    OpenAIRE

    Bourgeois-Gironde , Sacha; Giraud , Raphaël

    2005-01-01

    We suscribe to an account of framing-effects in decision theory in terms of an inference to a background informationa by the hearer when a speaker uses a certain frame while other equivalent frames were also available. This account was sketched by Craig McKenzie. We embed it in Bolker-Jeffrey decision model (or logic of action) - one main reason of this is that this latter model makes preferences bear on propositions. We can deduce a given anomaly or cognitive bias (namely framing-effects) in...

  8. NRC staff site characterization analysis of the Department of Energy`s Site Characterization Plan, Yucca Mountain Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-08-01

    This Site Characterization Analysis (SCA) documents the NRC staff`s concerns resulting from its review of the US Department of Energy`s (DOE`s) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation`s first geologic repository for high-level radioactive waste. DOE`s SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC`s specific objections related to the SCP, and major comments and recommendations on the various parts of DOE`s program, are presented in SCA Section 2, Director`s Comments and Recommendations. Section 3 contains summaries of the NRC staff`s concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE`s program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC`s responsibilities with respect to DOE`s SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs.

  9. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  10. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  11. Ames expedited site characterization demonstration at the former manufactured gas plant site, Marshalltown, Iowa

    International Nuclear Information System (INIS)

    Bevolo, A.J.; Kjartanson, B.H.; Wonder, J.D.

    1996-03-01

    The goal of the Ames Expedited Site Characterization (ESC) project is to evaluate and promote both innovative technologies (IT) and state-of-the-practice technologies (SOPT) for site characterization and monitoring. In April and May 1994, the ESC project conducted site characterization, technology comparison, and stakeholder demonstration activities at a former manufactured gas plant (FMGP) owned by Iowa Electric Services (IES) Utilities, Inc., in Marshalltown, Iowa. Three areas of technology were fielded at the Marshalltown FMGP site: geophysical, analytical and data integration. The geophysical technologies are designed to assess the subsurface geological conditions so that the location, fate and transport of the target contaminants may be assessed and forecasted. The analytical technologies/methods are designed to detect and quantify the target contaminants. The data integration technology area consists of hardware and software systems designed to integrate all the site information compiled and collected into a conceptual site model on a daily basis at the site; this conceptual model then becomes the decision-support tool. Simultaneous fielding of different methods within each of the three areas of technology provided data for direct comparison of the technologies fielded, both SOPT and IT. This document reports the results of the site characterization, technology comparison, and ESC demonstration activities associated with the Marshalltown FMGP site. 124 figs., 27 tabs

  12. SITE-94. Mineralogy of the Aespoe site

    International Nuclear Information System (INIS)

    Andersson, Karin

    1996-12-01

    The water composition has several impacts on the repository. It will influence the behaviour of the engineered materials (e.g. corrosion). It may also determine the possible solubility and speciation of released radionuclides. It also acts as a transport medium for the released elements. The groundwater composition and the potential development of the composition due to the presence of the repository as well as due to external variations is thus an important issue in a safety analysis. The development of the groundwater composition is strongly dependent on reactions with the minerals present in water bearing fractures. Here equilibrium chemistry may be of importance, but also reaction kinetics is important to the long-term behaviour. Within the SITE-94 project, a safety analysis is performed for the conditions at the Aespoe site. The mineralogy of the area has been evaluated from drill cores at various places at the site. In this report a recommendation for selection of mineralogy to be used in geochemical modelling of the repository is given. Calcite and iron containing minerals dominate the fracture filling mineralogy at the Aespoe site. Some typical fracture filling mineralogies may be identified in the fractures: epidote, chlorite, calcite, hematite, some illite/smectite + quartz, fluorite, pyrite and goethite. In addition to these a number of minor minerals are found in the fractures. Uncertainties in the fracture filling data may be due to problems when taking out the drill cores. Drilling water may remove important clay minerals and sealed fractures may be reopened mechanically and treated as water conducting fractures. The problem of determining the variability of the mineralogy along the flow paths also remains. This problem will never be solved when the investigation is performed by drilling investigation holes

  13. Meteorology in site operations

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    During the site selection and design phases of a plant, meteorological assistance must be based on past records, usually accumulated at stations not actually on the site. These preliminary atadvices will be averages and extremes that might be expected. After a location has been chosen and work has begun, current and forecast weather conditions become of immediate concern. On-site meteorological observations and forecasts have many applications to the operating program of an atomic energy site. Requirements may range from observations of the daily minimum temperatures to forecasts of radiation dosages from airborne clouds

  14. A Site Wide Perspective on Uranium Geochemistry at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Zachara, John M.; Brown, Christopher F.; Christensen, J. N.; Davis, Jim A.; Dresel, P. Evan; Liu, Chongxuan; Kelly, S. D.; McKinley, James P.; Serne, R. Jeffrey; Um, Wooyong

    2007-10-26

    Uranium (U) is an important risk-driving contaminant at the Hanford Site. Over 200,000 kg have been released to the vadose zone over the course of site operations, and a number of vadose zone and groundwater plumes containing the uranyl cation [UO22+, U(VI)] have been identified. U is recognized to be of moderate-to-high mobility, conditions dependent. The site is currently making decisions on several of these plumes with long-lasting implications, and others are soon to come. Uranium is one of nature’s most intriguing and chemically complex elements. The fate and transport of U(VI) has been studied over the long lifetime of the Hanford Site by various contractors, along with the Pacific Northwest National Laboratory (PNNL) and its collaborators. Significant research has more recently been contributed by the national scientific community with support from the U.S. Department of Energy’s (DOE) Office of Science through its Environmental Remediation Sciences Division (ERSD). This report represents a first attempt to integrate these findings into a cohesive view of the subsurface geochemistry of U at the Hanford Site. The objective is to inform all interested Hanford parties about the in-ground inventory of U and its geochemical behavior. This report also comments on the prospects for the development of a robust generic model to more accurately forecast future U(VI) migration at different Hanford waste sites, along with further research necessary to reach this goal.

  15. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  16. Site development

    International Nuclear Information System (INIS)

    Gaynor, R.K.

    1989-01-01

    Development of a low-level radioactive waste land disposal facility is little different than any industrial development of similar scope. Consideration must be made for normal business and operations management, security, facility maintenance, traffic control and necessary amenities for personnel. The item specific to the low-level waste site is the handling of radioactive waste materials and the regulatory and environmental protection procedures that must be planned for and accomodated in the site design and development. Each of these elements and the facility as a whole must be designed to be compatible with local land use plans, available transportation and support services, and the social and economic goals of the local community. Plans should also be made for quality control and orderly construction. This chapter deals with those aspects of the facility, its design and construction which are integral parts to the overall performance of the site

  17. XenoSite: accurately predicting CYP-mediated sites of metabolism with neural networks.

    Science.gov (United States)

    Zaretzki, Jed; Matlock, Matthew; Swamidass, S Joshua

    2013-12-23

    Understanding how xenobiotic molecules are metabolized is important because it influences the safety, efficacy, and dose of medicines and how they can be modified to improve these properties. The cytochrome P450s (CYPs) are proteins responsible for metabolizing 90% of drugs on the market, and many computational methods can predict which atomic sites of a molecule--sites of metabolism (SOMs)--are modified during CYP-mediated metabolism. This study improves on prior methods of predicting CYP-mediated SOMs by using new descriptors and machine learning based on neural networks. The new method, XenoSite, is faster to train and more accurate by as much as 4% or 5% for some isozymes. Furthermore, some "incorrect" predictions made by XenoSite were subsequently validated as correct predictions by revaluation of the source literature. Moreover, XenoSite output is interpretable as a probability, which reflects both the confidence of the model that a particular atom is metabolized and the statistical likelihood that its prediction for that atom is correct.

  18. Site Management Guide (Blue Book)

    International Nuclear Information System (INIS)

    2014-01-01

    The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department's postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE's postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site

  19. Site scientific mission plan for the Southern Great Plains CART Site, January--June 1999

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Sisterson, D.L.; Lamb, P.

    1999-03-10

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 1999, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  20. Site scientific mission plan for the Southern Great Plains CART site: July--December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on July 1, 1998, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  1. SiteChar. Characterisation of European CO2 storage. Deliverable 8.4. Quantitative social site characterisations

    Energy Technology Data Exchange (ETDEWEB)

    Brunsting, S.; Mastop, E.A. [ECN Policy Studies, Energy research Centre of the Netherlands ECN, Amsterdam (Netherlands); Kaiser, M.; Zimmer, R. [Unabhaengiges Institut fuer Umweltfragen UfU, Berlin (Germany)

    2013-06-15

    This report describes the results of the last stage of the in-depth social site characterisation activities at two prospective CCS sites as part of the SiteChar project: a CCS onshore site and a CCS offshore site. The onshore site is the Zalecze and Zuchlow site application (Poland - WP5) and the offshore site is the North Sea Moray Firth site (UK - WP3). This deliverable describes the results from a repeated quantitative measurement of local awareness, knowledge, and perceptions of CCS at both sites using representative surveys. For comparison and discussion of all SiteChar WP8 results we refer to the final summary report D8.5. The 2nd survey showed some interesting results. First of all, awareness of CCS was still very low. While in the UK around half of the respondents had at least heard of local plans for CCS, in Poland this was only 21%. It seems that awareness in the UK was mostly induced by specific plans in the area that were abandoned in the course of the SiteChar project. Second, it seems that on the whole the local publics were rather positive about CCS. Most respondents expected a positive impact of CCS on the region. In the UK, arguments for that were mainly economic, while in Poland arguments were mainly related to environmental concerns. Although there are some worries about risks of leakage, especially at the onshore site in Poland, people think that authorities will properly regulate CCS and monitor the safety of CCS. Expectations were mostly that it would be good for the country and that it will help reach international targets for CO2 reduction and buy time to develop renewable energy. Respondents seemed uncertain about the costs of using CCS and whether the technique is ready for widespread use. Especially in Poland people seemed to agree that CCS is essential for tackling climate change. Most differences between the two sites may be attributed to the proximity of the site to the local community. The Polish site is onshore and therefore much

  2. Environmental assessment: Davis Canyon site, Utah

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs

  3. Environmental assessment: Davis Canyon site, Utah

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high- level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of the five sites suitable for characterization.

  4. Environmental assessment: Davis Canyon site, Utah

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs.

  5. Environmental assessment: Davis Canyon site, Utah

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization.

  6. Environmental assessment: Davis Canyon site, Utah

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization

  7. Environmental assessment: Davis Canyon site, Utah

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high- level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of the five sites suitable for characterization

  8. MORPHOLOGY OF METHANE HYDRATE HOST SEDIMENTS

    International Nuclear Information System (INIS)

    JONES, K.W.; FENG, H.; TOMOV, S.; WINTER, W.J.; EATON, M.; MAHAJAN, D.

    2004-01-01

    Results from simulated experiments in several laboratories show that host sediments influence hydrate formation in accord with known heterogeneity of host sediments at sites of gas hydrate occurrence (1). For example, in Mackenzie Delta, NWT Canada (Mallik 2L-38 well), coarser-grained units (pore-filling model) are found whereas in the Gulf of Mexico, the found hydrate samples do not appear to be lithologically controlled. We have initiated a systematic study of sediments, initially focusing on samples from various depths at a specific site, to establish a correlation with hydrate occurrence (or variations thereof) to establish differences in their microstructure, porosity, and other associated properties. The synchrotron computed microtomography (CMT) set-up at the X-27A tomography beam line at the National Synchrotron Light Source (NSLS), Brookhaven National Laboratory was used as a tool to study sediments from Blake Ridge at three sub bottom depths of 0.2, 50, and 667 meters. Results from the tomographic analysis of the deepest sample (667 m) are presented here to illustrate how tomography can be used to obtain new insights into the structures of methane hydrate host sediments. The investigation shows the internal grain/pore space resolution in the microstructure and a 3-D visualization of the connecting pathways obtained following data segmentation into pore space and grains within the sediment sample. The analysis gives the sample porosity, specific surface area, mean particle size, and tortuosity, as well. An earlier report on the experimental program has been given by Mahajan et al. (2)

  9. Wind resource modelling for micro-siting - Validation at a 60-MW wind farm site

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, J C; Gylling Mortensen, N [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark); Said, U S [New and Renewable Energy Authority, Cairo (Egypt)

    1999-03-01

    This paper investigates and validates the applicability of the WAsP-model for layout optimization and micro-siting of wind turbines at a given site for a 60-MW wind farm at Zafarana at the Gulf of Suez in Egypt. Previous investigations show large gradients in the wind climate within the area. For the design and optimization of the wind farm it was found necessary to verify the WAsP extrapolation of wind atlas results from 2 existing meteorological masts located 5 and 10 km, respectively, from the wind farm site. On-site measurements at the 3.5 x 3.5 km{sup 2} wind farm site in combination with 7 years of near-site wind atlas measurements offer significant amounts of data for verification of wind conditions for micro-siting. Wind speeds, wind directions, turbulence intensities and guests in 47.5 m a.g.l. have been measured at 9 locations across the site. Additionally, one of the site masts is equipped as a reference mast, measuring both vertical profiles of wind speed and temperature as well as air pressure and temperature. The exercise is further facilitated by the fact that winds are highly uni-directional; the north direction accounting for 80-90% of the wind resource. The paper presents comparisons of 5 months of on-site measurements and modeled predictions from 2 existing meteorological masts located at distances of 5 and 10 km, respectively, from the wind farm site. Predictions based on terrain descriptions of the Wind Atlas for the Gulf of Suez 1991-95 showed over-predictions of wind speeds of 4-10%. With calibrated terrain descriptions, made based on measured data and a re-visit to critical parts of the terrain, the average prediction error of wind speeds was reduced to about 1%. These deviations are smaller than generally expected for such wind resource modeling, clearly documenting the validity of using WAsP modeling for micro-siting and layout optimization of the wind farm. (au)

  10. Nuclear waste repository siting

    International Nuclear Information System (INIS)

    Soloman, B.D.; Cameron, D.M.

    1987-01-01

    This paper discusses the geopolitics of nuclear waste disposal in the USA. Constitutional choice and social equity perspectives are used to argue for a more open and just repository siting program. The authors assert that every potential repository site inevitably contains geologic, environmental or other imperfections and that the political process is the correct one for determining sites selected

  11. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  12. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  13. Does Infection Site Matter? A Systematic Review of Infection Site Mortality in Sepsis.

    Science.gov (United States)

    Motzkus, Christine A; Luckmann, Roger

    2017-09-01

    Sepsis treatment protocols emphasize source control with empiric antibiotics and fluid resuscitation. Previous reviews have examined the impact of infection site and specific pathogens on mortality from sepsis; however, no recent review has addressed the infection site. This review focuses on the impact of infection site on hospital mortality among patients with sepsis. The PubMed database was searched for articles from 2001 to 2014. Studies were eligible if they included (1) one or more statistical models with hospital mortality as the outcome and considered infection site for inclusion in the model and (2) adult patients with sepsis, severe sepsis, or septic shock. Data abstracted included stage of sepsis, infection site, and raw and adjusted effect estimates. Nineteen studies were included. Infection sites most studied included respiratory (n = 19), abdominal (n = 19), genitourinary (n = 18), and skin and soft tissue infections (n = 11). Several studies found a statistically significant lower mortality risk for genitourinary infections on hospital mortality when compared to respiratory infections. Based on studies included in this review, the impact of infection site in patients with sepsis on hospital mortality could not be reliably estimated. Misclassification among infections and disease states remains a serious possibility in studies on this topic.

  14. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  15. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  16. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-17

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  17. CERCLA site assessment workbook

    International Nuclear Information System (INIS)

    1994-08-01

    This contains comments for each chapter of exercises (in Vol. 1) which illustrate how to conduct site assessments for CERCLA regulation. A through analysis of the exercises is provided so that work and solutions from Vol 1 can be critiqued and comments are also included on the strategy of site assessment whereas the exercises illustrate the principles involved. Covered exercises include the following: A preliminary assessment of a ground water site; waste characteristics and characterization of sources; documentation of observed releases and actual contamination of targets; the strategy of an SI at a surface water site; the soil exposure pathway; the air pathway

  18. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  19. Siting controversial facilities

    International Nuclear Information System (INIS)

    Baird, R.D.; Blacker, P.B.

    1985-01-01

    There is often significant difficulty involved with siting controversial facilities. The social and political problems are frequently far more difficult to resolve than the technical and economic issues. The tendancy for most developing organizations is to address only technical issues in the search for a technically optimal site, to the exclusion of such weighting considerations as the social and political climate associated with potential sites--an approach which often imperils the success of the project. The site selection processes currently suggested is summarized and two contemporary examples of their application are cited. The difference between developers' real objectives and the objectives they have implicitly assumed by adopting the recommended approaches without augmentation are noted. The resulting morass of public opposition is attributed to the failure to consider the needs of individuals and groups who stand to be negatively impacted by the development. A comprehensive implementation strategy which addresses non-technical consideration in parallel with technical ones is presented and evaluated

  20. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  2. A future for nuclear sites beyond their service life. Nuclear site value development

    International Nuclear Information System (INIS)

    2008-01-01

    As the nuclear industry moves into a new development phase, many facilities built in the fifties and sixties are reaching the end of their service life. Dismantling them and rehabilitating the sites on which they stand is a major industrial challenge which will give rise to a number of new projects. AREVA has more than 20 years' experience in these highly technical fields. As more and more sites reach the end of their service life, AREVA considers nuclear site value development as a fully-fledged industrial activity. The group's competencies in this field have been grouped together to form a dedicated entity: the Nuclear Site Value Development Business Unit, created in 2008. Several billion euros are invested in site value development projects which are far-reaching and complex, and often last for several decades. Long before work actually begins, lengthy studies and preparations are required to schedule operations, select the techniques to be used and optimize costs and deadlines. The Nuclear Site Value Development BU is currently working on four major projects involving its own facilities and those of the CEA: - La Hague: dismantling of the first generation of used fuel recycling facilities. Between 1966 and 1998, almost 5,000 tons of used fuel from graphite-moderated gas-cooled reactors, 4,500 tons of light water reactor fuel, as well as fuel from fast reactors and research reactors, were treated at UP2 400, the very first industrial recycling plant on the La Hague site. - Marcoule: first-time dismantling of a recycling plant. 1,000 rooms to be cleaned up, 30,000 tons of waste to be treated, 30 years of work. - Cadarache: first-time dismantling of a Mox fuel fabrication plant. The Cadarache plant was commissioned in 1962 to fabricate fuel for fast reactors; this was followed by MOX fuel for light water reactors, an activity which continued until the plant was shut down in 2003. - Annecy and Veurey: giving a new lease of life to former industrial sites in built

  3. The commissioning of CMS sites: Improving the site reliability

    International Nuclear Information System (INIS)

    Belforte, S; Fisk, I; Flix, J; Hernandez, J M; Klem, J; Letts, J; Magini, N; Saiz, P; Sciaba, A

    2010-01-01

    The computing system of the CMS experiment works using distributed resources from more than 60 computing centres worldwide. These centres, located in Europe, America and Asia are interconnected by the Worldwide LHC Computing Grid. The operation of the system requires a stable and reliable behaviour of the underlying infrastructure. CMS has established a procedure to extensively test all relevant aspects of a Grid site, such as the ability to efficiently use their network to transfer data, the functionality of all the site services relevant for CMS and the capability to sustain the various CMS computing workflows at the required scale. This contribution describes in detail the procedure to rate CMS sites depending on their performance, including the complete automation of the program, the description of monitoring tools, and its impact in improving the overall reliability of the Grid from the point of view of the CMS computing system.

  4. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  5. The SKI SITE-94 project approach to analyzing confidence in site-specific data

    International Nuclear Information System (INIS)

    Dverstorp, B.; Andersson, J.

    1995-01-01

    The ongoing SKI SITE-94 project is a fully integrated performance assessment based on a hypothetical repository at 500 m depth in crystalline rock. One main objective of the project is to develop a methodology for incorporating data from a site characterization into the performance assessment. The hypothetical repository is located at SKB's Hard Rock Laboratory at Aspo in south-eastern Sweden. The site evaluation in SITE-94 uses data from the pre-excavation phase that comprised measurements performed on the ground and in boreholes, including cross-hole hydraulic and tracer experiments. Uncertainties related to measurement technique, equipment and methods for interpretation were evaluated through a critical review of geohydraulic measurement methods and a complete re-evaluation of the hydraulic packer tests using the generalised radial flow (GRF) theory. Groundwater chemistry samples were analyzed for representativeness and sampling errors. A wide range of site models within geology, hydrogeology, geochemistry and rock mechanics has been developed and tested with the site characterization data. (authors). 10 refs., 3 figs., 2 tabs

  6. Environmental assessment, Richton Dome site, Mississippi

    International Nuclear Information System (INIS)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC Sections 10101-10226) requires the environmental assessment of a potential site to include a statement of the basis for the nomination of a site as suitable for characterization. Volume 2 of this environmental assessment provides a detailed evaluation of the Richton Dome Site and its suitability as the site for a radioactive waste disposal facility under DOE siting guidelines, as well as a comparison of the Richton Dome site with other proposed sites. Evaluation of the Richton Dome site is based on the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The comparative evaluation of proposed sites is required under DOE guidelines, but is not intended to directly support the subsequent recommendation of three sites for characterization as candidate sites. 428 refs., 24 figs., 62 tabs

  7. Environmental assessment: Richton Dome site, Mississippi

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines

  8. Environmental assessment: Richton Dome Site, Mississippi

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines.

  9. Environmental assessment: Richton Dome site, Mississippi

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines.

  10. Environmental assessment: Richton Dome Site, Mississippi

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines

  11. Nevada National Security Site Environmental Report 2012 Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Wills, Cathy A

    2013-09-11

    This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2012 (National Security Technologies, LLC [NSTec], 2013). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  12. Nevada National Security Site Environmental Report 2016, Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Wills, Cathy [National Security Technologies, LLC. (NSTec), Mercury, NV (United States)

    2017-09-07

    This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2016 (prepared by National Security Technologies, LLC [NSTec], 2017). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  13. Nevada National Security Site Environmental Report 2013 Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    Wills, C.

    2014-09-09

    This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2012 (National Security Technologies, LLC [NSTec], 2013). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  14. Site scientific mission plan for the southern great plains CART site January-June 2000.; TOPICAL

    International Nuclear Information System (INIS)

    Peppler, R. A.; Sisterson, D. L.; Lamb, P.

    2001-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 2000, and looks forward in less detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team[DSIT], Operations Team, and Instrument Team[IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding. With this issue, many aspects of earlier Site Scientific Mission Plan reports have been moved to ARM sites on the World Wide Web. This report and all previous reports are available on the SGP CART web site

  15. Site Scientific Mission Plan for the Southern Great Plains CART site: January--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, J.M.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1993-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1994, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM Functional Teams (Management Team, Experiment Support Team, Operations Team, Data Management Team, Instrument Team, and Campaign Team), and it serves to disseminate the plans more generally within the ARM Program and among the Science Team. This document includes a description of the site`s operational status and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods. Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, the ARM Program Experiment Center, and the aforementioned ARM Program Functional Teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  16. Development of site-specific soil cleanup criteria: New Brunswick Laboratory, New Jersey site

    Energy Technology Data Exchange (ETDEWEB)

    Veluri, V.R.; Moe, H.J.; Robinet, M.J.; Wynveen, R.A.

    1983-03-01

    The potential human exposure which results from the residual soil radioactivity at a decommissioned site is a prime concern during D and D projects. To estimate this exposure, a pathway analysis approach is often used to arrive at the residual soil radioactivity criteria. The development of such a criteria for the decommissioning of the New Brunswick Laboratory, New Jersey site is discussed. Contamination on this site was spotty and located in small soil pockets spread throughout the site area. Less than 1% of the relevant site area was contaminated. The major contaminants encountered at the site were /sup 239/Pu, /sup 241/Am, normal and natural uranium, and natural thorium. During the development of the pathway analysis to determine the site cleanup criteria, corrections for the inhomogeneity of the contamination were made. These correction factors and their effect upon the relevant pathway parameters are presented. Major pathways by which radioactive material may reach an individual are identified and patterns of use are specified (scenario). Each pathway is modeled to estimate the transfer parameters along the given pathway, such as soil to air to man, etc. The transfer parameters are then combined with dose rate conversion factors (ICRP 30 methodology) to obtain soil concentration to dose rate conversion factors (pCi/g/mrem/yr). For an appropriate choice of annual dose equivalent rate, one can then arrive at a value for the residual soil concentration. Pathway modeling, transfer parameters, and dose rate factors for the three major pathways; inhalation, ingestion and external exposure, which are important for the NBL site, are discussed.

  17. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  18. NOAA History - About This Site

    Science.gov (United States)

    NOAA History Banner gold bar divider home - takes you to index page about the site contacts noaa - takes you to the noaa home page search this site white divider about this site The NOAA History site is the result of the work of many individuals throughout 3d history page NOAA who have been inspired by

  19. General siting study 95. Siting of a deep repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    1995-10-01

    General Siting Study 95 is a detailed description of the work carried out to put the siting of a deep repository in a national and regional context. The report is based on SKB's siting factors, which have been applied on a national scale. Different factors of importance or of possible importance for the long-term radiological safety, technology, land and environment as well as society are described and evaluated. This report is the overall description on general siting studies which the government considered that SKB should report in connection with the RD and D Programme 95. 121 refs, 40 figs

  20. General siting study 95. Siting of a deep repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    General Siting Study 95 is a detailed description of the work carried out to put the siting of a deep repository in a national and regional context. The report is based on SKB`s siting factors, which have been applied on a national scale. Different factors of importance or of possible importance for the long-term radiological safety, technology, land and environment as well as society are described and evaluated. This report is the overall description on general siting studies which the government considered that SKB should report in connection with the RD and D Programme 95. 121 refs, 40 figs.

  1. Siting of research reactors

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this document is to develop criteria for siting and the site-related design basis for research reactors. The concepts presented in this document are intended as recommendations for new reactors and are not suggested for backfitting purposes for facilities already in existence. In siting research reactors serious consideration is given to minimizing the effects of the site on the reactor and the reactor on the site and the potential impact of the reactor on the environment. In this document guidance is first provided on the evaluation of the radiological impact of the installation under normal reactor operation and accident conditions. A classification of research reactors in groups is then proposed, together with a different approach for each group, to take into account the relevant safety problems associated with facilities of different characteristics. Guidance is also provided for both extreme natural events and for man-induced external events which could affect the safe operation of the reactor. Extreme natural events include earthquakes, flooding for river or coastal sites and extreme meteorological phenomena. The feasibility of emergency planning is finally considered for each group of reactors

  2. The Current and Historical Distribution of Special Status Amphibians at the Livermore Site and Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Hattem, M V; Paterson, L; Woollett, J

    2008-08-20

    65 surveys were completed in 2002 to assess the current distribution of special status amphibians at the Lawrence Livermore National Laboratory's (LLNL) Livermore Site and Site 300. Combined with historical information from previous years, the information presented herein illustrates the dynamic and probable risk that amphibian populations face at both sites. The Livermore Site is developed and in stark contrast to the mostly undeveloped Site 300. Yet both sites have significant issues threatening the long-term sustainability of their respective amphibian populations. Livermore Site amphibians are presented with a suite of challenges inherent of urban interfaces, most predictably the bullfrog (Rana catesbeiana), while Site 300's erosion issues and periodic feral pig (Sus scrofa) infestations reduce and threaten populations. The long-term sustainability of LLNL's special status amphibians will require active management and resource commitment to maintain and restore amphibian habitat at both sites.

  3. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  4. Geoscientific evaluation factors and criteria for siting and site evaluation. Progress report

    International Nuclear Information System (INIS)

    Stroem, A.; Ericsson, Lars O.; Svemar, C.; Almen, K.E.; Andersson, Johan

    1999-03-01

    The purposes of the present report are to: present the work that has been done to identify the parameters that need to be determined in a geoscientific site investigation and that serve as the basis for the work with geoscientific evaluation factors; give a progress report from the project that was initiated in 1997 named Siting Factors and Criteria for Site Evaluation, with an emphasis on definitions, outline and structure for the execution of the work; present geoscientific requirements on function both general and in detail in the form of an example for the discipline rock mechanics; present geoscientific evaluation factors associated with different stages in the siting work in the form of an example for the discipline hydrogeochemical composition; present plans for further work as regards criteria for site evaluation in different siting stages. The project is under way, and this is to be regarded as a progress report since e.g. criteria for site evaluation will be presented at a later date. The long-term performance and safety of the deep repository must always be evaluated by means of an integrated safety assessment. The work with factors and criteria can never take the place of such an assessment, but can provide guidance regarding its outcome. Requirements and preferences regarding the function of the rock in the deep repository have been clarified in this progress report. What is new here is the structuring that has been carried out, with a classification into different geoscientific disciplines, and the formalism that has been given to the terms requirement, preference and function. Based on fundamental safety and construction functions, requirements on function have been specified for the disciplines geology, thermal properties, hydro-geology, rock mechanics, chemistry and transport properties. Furthermore, function analyses have been identified by means of which it is possible to concretize requirements on function and which geoscientific parameters are

  5. Geoscientific evaluation factors and criteria for siting and site evaluation. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Stroem, A.; Ericsson, Lars O.; Svemar, C. [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Almen, K.E. [KEA GEO-konsult AB (Sweden); Andersson, Johan [Golder Grundteknik KB (Sweden)

    1999-03-01

    The purposes of the present report are to: present the work that has been done to identify the parameters that need to be determined in a geoscientific site investigation and that serve as the basis for the work with geoscientific evaluation factors; give a progress report from the project that was initiated in 1997 named Siting Factors and Criteria for Site Evaluation, with an emphasis on definitions, outline and structure for the execution of the work; present geoscientific requirements on function both general and in detail in the form of an example for the discipline rock mechanics; present geoscientific evaluation factors associated with different stages in the siting work in the form of an example for the discipline hydrogeochemical composition; present plans for further work as regards criteria for site evaluation in different siting stages. The project is under way, and this is to be regarded as a progress report since e.g. criteria for site evaluation will be presented at a later date. The long-term performance and safety of the deep repository must always be evaluated by means of an integrated safety assessment. The work with factors and criteria can never take the place of such an assessment, but can provide guidance regarding its outcome. Requirements and preferences regarding the function of the rock in the deep repository have been clarified in this progress report. What is new here is the structuring that has been carried out, with a classification into different geoscientific disciplines, and the formalism that has been given to the terms requirement, preference and function. Based on fundamental safety and construction functions, requirements on function have been specified for the disciplines geology, thermal properties, hydro-geology, rock mechanics, chemistry and transport properties. Furthermore, function analyses have been identified by means of which it is possible to concretize requirements on function and which geoscientific parameters are

  6. Repository site characterization

    International Nuclear Information System (INIS)

    Voss, J.W.; Pentz, D.L.

    1987-01-01

    The characterization of candidate repository sites has a number of programmatic objectives. Principal among these is the acquisition of data: a) to determine the suitability of a site relative to the DOE repository siting guidelines, b) to support model development and calculations to determine the suitability of a site relative to the post closure criteria of the NRC and EPA, c) to support the design of a disposal system, including the waste package and the engineered barrier system, as well as the shafts and underground openings of the repository. In meeting the gaols of site characterization, the authors have an obligation to conduct their investigations within an appropriate budget and schedule. This mandates that a well-constructed and systematic plan for field investigations be developed. Such a plan must fully account for the mechanisms which will control the radiologic performance in the repository. The plan must also flexibly and dynamically respond to the results of each step of field investigation, responding to the spatial variability of earth as well as to enhanced understandings of the performance of the disposal system. Such a plan must ensure that sufficient data are available to support the necessary probabilistic calculations of performance. This paper explores the planning for field data acquisition with specific reference to requirements for demonstrations of the acceptable performance for disposal systems

  7. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  8. Coordinated site characterization and performance assessment - an iterative approach for the site evaluation

    International Nuclear Information System (INIS)

    Papp, T.; Ericsson, L.O.; Thegerstroem, C.; Almen, K.E.

    1995-01-01

    SKB planning for siting a deep repository involves feasibility studies in 5-10 municipalities surface based characterization and drilling on two candidate sites and detailed characterization of one site including a shaft to proposed repository depth. The selection of a site or the detailed layout of the repository defines characteristics that might influence safety in a broad sense. There is a strong ling between the safety, technical (engineering) and functional aspects. The site selection will be based on general geoscientific information, i.e. mechanical stability, ground-water chemistry, slow ground-water movements and complicating factors like high potential for mineralization. The general layout of the repository in the actual geological structure of the site must be done with regard to a number of guidelines, e.g. to hydraulically separate the parts of the repository containing the spent nuclear fuel from those for other types of long lived waste and to separate the two stages of the spent fuel repository so they can be handled separately in the licensing process. When the various parts of the repository have been tentatively located the consequence of the multiple barrier principle is that the layout of the various parts should be made with the aim to utilize the available natural barrier system at the site as well as possible. (authors). 2 refs., 3 figs., 2 tabs

  9. Site characterization design and techniques used at the Southern Shipbuilding Corporation site

    International Nuclear Information System (INIS)

    Mueller, J.P.; Geraghty, C.A.; Moore, G.W.; Mullins, J.R.

    1995-01-01

    The Southern Shipbuilding Corporation (SSC) site is an inactive barge/ship manufacturing and repair facility situated on approximately 54 acres in Slidell, St. Tammany Parish, Louisiana. Two unlined surface impoundments (North and South impoundments) are situated on the northwest portion of the site and are surrounded on three sides by Bayou Bonfouca. These impoundments are the sources of carcinogenic polynuclear aromatic hydrocarbon (CPAH) contamination at the site. Inadequate containment has resulted in the release of impoundment wastes into the bayou. To evaluate potential response alternatives for the site, an Engineering Evaluation/Cost Analysis (EE/CA) field investigation was conducted from July through October 1994. A two phase sampling approach was used in combination with innovative and traditional sampling techniques, field screening technologies, and exploitation of the visual characteristics of the waste to determine the extent of waste migration with limited off-site laboratory confirmation. A skid-mounted mobile drilling unit, secured to a specialized sampling platform designed for multiple applications, was used for collection of sediment cores from the bayou as well as tarry sludge cores from the impoundments. Field screening of core samples was accomplished on site using an organic vapor analyzer and a total petroleum hydrocarbon (TPH) field analyzer. Pollutants of concern include metals, cyanide, dioxin, and organic compounds. This paper presents details on the sampling design and characterization techniques used to accomplish the EE/CA field investigation

  10. CCS site characterisation criteria

    Energy Technology Data Exchange (ETDEWEB)

    Bachu, S.; Hawkes, C.; Lawton, D.; Pooladi-Darvish, M.; Perkins, E.

    2009-12-15

    IEA GHG recently commissioned the Alberta Research Counil in Canada to conduct a review of storage site selection criteria and site characterisation methods in order to produce a synthesis report. This report reviews the literature on the subject on the site seleciton and characterisation since the publication of the IPCC Special Report on CCS, and provides a synthesis and classification of criteria. 161 refs.

  11. 14 CFR 420.21 - Launch site location review-launch site boundary.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site location review-launch site boundary. 420.21 Section 420.21 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... travels given a worst-case launch vehicle failure in the launch area. An applicant must clearly and...

  12. Site-Specific Innovation

    DEFF Research Database (Denmark)

    Reeh, Henrik; Hemmersam, Peter

    2015-01-01

    Currently, cities across the Northern European region are actively redeveloping their former industrial harbours. Indeed, harbours areas are essential in the long-term transition from industrial to information and experience societies; harbours are becoming sites for new businesses and residences...... question is how innovation may contribute to urban life and site-specific qualities....

  13. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE's repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab

  14. Site Practice

    DEFF Research Database (Denmark)

    Wahedi, Haseebullah

    2016-01-01

    different practices in the construction phase. The research is based on an ethnographic study of a case in Denmark. The empirical data were collected through direct observations and semi-structured interviews with site managers, contract managers, foremen and craftsmen. Findings revealed...... that the construction phase comprises several communities and practices, leading to various uses of the drawings. The results indicated that the craftsmen used drawings to position themselves in the correct location, and that the site managers and contract managers used them as management tools and legal documents...

  15. Microbes from mined sites: Harnessing their potential for reclamation of derelict mine sites

    International Nuclear Information System (INIS)

    Thavamani, Palanisami; Samkumar, R. Amos; Satheesh, Viswanathan; Subashchandrabose, Suresh R.; Ramadass, Kavitha; Naidu, Ravi; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu

    2017-01-01

    Derelict mines pose potential risks to environmental health. Several factors such as soil structure, organic matter, and nutrient content are the greatly affected qualities in mined soils. Soil microbial communities are an important element for successful reclamation because of their major role in nutrient cycling, plant establishment, geochemical transformations, and soil formation. Yet, microorganisms generally remain an undervalued asset in mined sites. The microbial diversity in derelict mine sites consists of diverse species belonging to four key phyla: Proteobacteria, Acidobacteria, Firmicutes, and Bacteroidetes. The activity of plant symbiotic microorganisms including root-colonizing rhizobacteria and ectomycorrhizal fungi of existing vegetation in the mined sites is very high since most of these microbes are extremophiles. This review outlines the importance of microorganisms to soil health and the rehabilitation of derelict mines and how microbial activity and diversity can be exploited to better plan the soil rehabilitation. Besides highlighting the major breakthroughs in the application of microorganisms for mined site reclamation, we provide a critical view on plant−microbiome interactions to improve revegetation at the mined sites. Also, the need has been emphasized for deciphering the molecular mechanisms of adaptation and resistance of rhizosphere and non-rhizosphere microbes in abandoned mine sites, understanding their role in remediation, and subsequent harnessing of their potential to pave the way in future rehabilitation strategies for mined sites. - Highlights: • Abandoned mines pose potential risks to human and environmental health. • Re-establishment of a self-sustaining vegetative cover at derelict mines is a major challenge. • Soil microbial communities are very important for successful reclamation of mined sites. • Role of microorganisms in soil function in derelict mines needs to be understood.

  16. Site scientific mission plan for the southern Great Plain CART site July-December 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, P.J.; Peppler, R.A.; Sisterson, D.L.

    1997-08-28

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  17. Site characterization criteria (DOE-STD-1022-94) for natural phenomena hazards at DOE sites. Revision 1

    International Nuclear Information System (INIS)

    Chen, J.C.; Ueng, Tzou-Shin; Boissonnade, A.C.

    1995-01-01

    This paper briefly summarizes requirements of site characterization for Natural Phenomena Hazards (NPH) at DOE sites. In order to comply with DOE Order 5480.28, site characterization criteria has been developed to provide site-specific information needed for development of NPH assessment criteria. Appropriate approaches are outlined to ensure that the current state-of-the-art methodologies and procedures are used in the site characterization. General and detailed site characterization requirements are provided in the areas of meteorology, hydrology, geology, seismology and geotechnical studies

  18. Comparison of Physical Properties of Marine and Arctic Gas-Hydrate-Bearing Deposits

    Science.gov (United States)

    Winters, W. J.; Walker, M.; Collett, T. S.; Bryant, S. L.; Novosel, I.; Wilcox-Cline, R.; Bing, J.; Gomes, M. L.

    2009-12-01

    Gas hydrate (GH) occurs in both marine settings and in arctic environments within a wide variety of sediment types. Grain-size analyses from both environments indicate that intrinsic host-sediment properties have a strong influence on gas-hydrate distribution and morphologic characteristics. Depending on the amount formed or dissociated, gas hydrate can significantly change in situ sediment acoustic, mechanical, and hydraulic properties. The U.S. Geological Survey, in cooperation with the U.S. Dept. of Energy, BP Expl.-Alaska, Nat. GH Prog. of India, Canadian Geological Survey, Int. Ocean Drilling Program, Japan Oil Gas and Metals Nat. Corp., Japan Pet. Expl. Co., Int. Marine Past Global Changes Study (IMAGES) program, and Paleoceanography of the Atlantic and Geochemistry (PAGE) program, determined physical properties from marine and arctic sediments and their relation to the presence of GH. At two arctic sites, the Mount Elbert well on the Alaskan North Slope and the Mallik wells on the Mackenzie Delta, NWT, >10-m thick gas-hydrate-bearing (GHB) sandy deposits are capped by finer-grained sediments that may reduce gas migration. In the Mount Elbert well, average median grain sizes (MGS) for the two thickest GHB deposits are 65 and 60 µm. Finer-grained (average MGS of 9 and 28 µm) sediments have plug permeabilities that are 300 and 14 times smaller than underlying GHB sediment. Average MGS of GHB sediment from the Mallik 2L well is ~ 111 µm, compared to overlying sediment with an average MGS of ~ 32 µm. Gas hydrate morphology in the Gulf of Mexico (GOM) and offshore India is substantially more complex than in the arctic, and is related to pervasive, although not exclusive, finer-grained deposits. Massive, several-cm thick, GH layers were recovered in piston cores in the northern GOM, in sediment with little visible lithologic variability (average MGS ~ 0.8 µm). In wells off the east coast of India, GH was present in sand-rich, fractured clay, and reservoirs

  19. Siting nuclear power plants

    International Nuclear Information System (INIS)

    Yellin, J.; Joskow, P.L.

    1980-01-01

    The first edition of this journal is devoted to the policies and problems of siting nuclear power plants and the question of how far commercial reactors should be placed from urban areas. The article is divided into four major siting issues: policies, risk evaluation, accident consequences, and economic and physical constraints. One concern is how to treat currently operating reactors and those under construction that were established under less-stringent criteria if siting is to be used as a way to limit the consequences of accidents. Mehanical cost-benefit analyses are not as appropriate as the systematic use of empirical observations in assessing the values involved. Stricter siting rules are justified because (1) opposition because of safety is growing: (2) remote siting will make the industry more stable; (3) the conflict is eliminated between regulatory policies and the probability basis for nuclear insurance; and (4) joint ownership of utilities and power-pooling are increasing. 227 references, 7 tables

  20. Seafloor spreading magnetic anomalies in the southeastern Arabian Sea

    Digital Repository Service at National Institute of Oceanography (India)

    Chaubey, A.K.; Bhattacharya, G.C; Rao, D.G.

    . A new geomagnetic polarity time scale for the Late Cretaceous and Cenozoic. J. Geophys. Res., 97: 13,917-13,951. Cande, S.C., La Brecque, J.L., Larson, R.L., Pitman, W.C., Golovchenko, X. and Haxby, W.F., 1989. Magnetic linea- tions of the world....O., Herron, E.M., Pitman, W.C. and Le Pichon, X., 1968. Marine magnetic anomalies, geomagnetic field reversals, and motions of the ocean floor and continents. J. Geophys. Res., 73: 2119-2136. McKenzie, D.P. and Sclater, J.G., 1971. The evolution...

  1. PROBLEMAS METODOLÓGICOS EN LAS INVESTIGACIONES SOBRE LAS CAPACIDADES INTELECTUALES EN EL ESPECTRO AUTISTA: EL CASO DE LA PERFECCIÓN DEL CONDICIONAL Methodological problems in research on intellectual abilities on the autism spectrum: the case of conditional perfection

    OpenAIRE

    Miguel López Astorga

    2012-01-01

    Recientemente, son muchos los trabajos que han aparecido en el área de la psicología y de la ciencia cognitiva con el propósito de analizar las maneras de razonar y las capacidades intelectuales de sujetos diagnosticados como autistas. Tal es el caso de una investigación de McKenzie, Evans y Handley. Nosotros revisamos en este trabajo su investigación y sostenemos que contiene problemas metodológicos. Así, tratamos de mostrar cuáles son dichos problemas y proponemos la estructura que, a nuest...

  2. PROBLEMAS METODOLÓGICOS EN LAS INVESTIGACIONES SOBRE LAS CAPACIDADES INTELECTUALES EN EL ESPECTRO AUTISTA: EL CASO DE LA PERFECCIÓN DEL CONDICIONAL

    OpenAIRE

    López Astorga,Miguel

    2012-01-01

    Recientemente, son muchos los trabajos que han aparecido en el área de la psicología y de la ciencia cognitiva con el propósito de analizar las maneras de razonar y las capacidades intelectuales de sujetos diagnosticados como autistas. Tal es el caso de una investigación de McKenzie, Evans y Handley. Nosotros revisamos en este trabajo su investigación y sostenemos que contiene problemas metodológicos. Así, tratamos de mostrar cuáles son dichos problemas y proponemos la estructura que, a nuest...

  3. "All Our Relations": Respecting People and Scholarship

    DEFF Research Database (Denmark)

    Lysgaard, Jonas Greve; Neilson, Alison; Spannring, Reingaard

    and politics in research as well as communications about research (McKenzie, 2005). Philip Payne (2005) challenges the limitations of textual discourse as a way of knowing; he focuses on “being, doing and becoming a relational, social and ecological ‘self’” (p. 415) and suggests that strong cultural production....... (2012). An environmental ethical conceptual framework for research on sustainability and environmental education. Environmental Education Research, ifirst article, 1-24. Kulnieks, A., Longboat, D. R. & Young, K. (2013). Contemporary Studies in Environmental and Indigenous Pedagogies. A Curricula...

  4. Use of DOE site selection criteria for screening low-level waste disposal sites on the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Lee, D.W.; Ketelle, R.H.; Stinton, L.H.

    1983-09-01

    The proposed Department of Energy (DOE) site selection criteria were applied to the Oak Ridge Reservation, and the application was evaluated to determine the criteria's usefulness in the selection of a low-level waste disposal site. The application of the criteria required the development of a methodology to provide a framework for evaluation. The methodology is composed of site screening and site characterization stages. The site screening stage relies on reconnaissance data to identify a preferred site capable of satisfying the site selection criteria. The site characterization stage relies on a detailed site investigation to determine site acceptability. The site selection criteria were applied to the DOE Oak Ridge Reservation through the site screening stage. Results of this application were similar to those of a previous siting study on the Oak Ridge Reservation. The DOE site selection criteria when coupled with the methodology that was developed were easily applied and would be adaptable to any region of interest

  5. Site scientific mission plan for the southern Great Plains CART site, January--June 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. The primary purpose of this site scientific mission plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team, Operations Team, and Instrument Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the Site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  6. 78 FR 14088 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-03-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act requires that public notice of this meeting be announced in the Federal Register.

  7. Analysis of ILRS Site Ties

    Science.gov (United States)

    Husson, V. S.; Long, J. L.; Pearlman, M.

    2001-12-01

    By the end of 2000, 94% of ILRS stations had completed station and site information forms (i.e. site logs). These forms contain six types of information. These six categories include site identifiers, contact information, approximate coordinates, system configuration history, system ranging capabilities, and local survey ties. The ILRS Central Bureau, in conjunction with the ILRS Networks and Engineering Working Group, has developed procedures to quality control site log contents. Part of this verification entails data integrity checks of local site ties and is the primary focus of this paper. Local survey ties are critical to the combination of space geodetic network coordinate solutions (i.e. GPS, SLR, VLBI, DORIS) of the International Terrestrial Reference Frame (ITRF). Approximately 90% of active SLR sites are collocated with at least one other space geodetic technique. The process used to verify these SLR ties, at collocated sites, is identical to the approach used in ITRF2000. Local vectors (X, Y, Z) from each ILRS site log are differenced from its corresponding ITRF2000 position vectors (i.e. no transformations). These X, Y, and Z deltas are converted into North, East, and Up. Any deltas, in any component, larger than 5 millimeter is flagged for investigation. In the absence of ITRF2000 SLR positions, CSR positions were used. To further enhance this comparison and to fill gaps in information, local ties contained in site logs from the other space geodetic services (i.e. IGS, IVS, IDS) were used in addition to ITRF2000 ties. Case studies of two collocated sites (McDonald/Ft. Davis and Hartebeeshtoek) will be explored in-depth. Recommendations on how local site surveys should be conducted and how this information should be managed will also be presented.

  8. International workshop on site investigation and evaluation based on the siting process in Sweden

    International Nuclear Information System (INIS)

    Andersson, Johan; Stroem, A.

    2001-06-01

    SKB's goal is to commence surface based site investigations in 2002. Extensive preparations are now being made for this transition to the next phase in the siting process for the deep repository for spent nuclear fuel. The purpose of the international workshop on site characterisation held at Aespoe April 2001 was to: present the SKB site investigation and evaluation programme to a group of international experts; discuss whether the available toolbox of investigation methods for surface based site investigations is appropriate and state-of-the-art in an international perspective; and by working group sessions discuss the level of ambition in the programme for site investigation for each discipline. This report summarises the conclusions of the workshop in general terms. Many of the detailed comments and ideas obtained at the workshop have already inspired and will also directly inspire the on-going planning work for site characterisation. The core activity at the workshop was the work performed by working groups. They addressed what should be considered for a site characterisation programme, based on the generic planning made so far by SKB. The working groups also outlined site specific characterisation programmes for the sites suggested by SKB. The tasks were strictly confined to technical and scientific modelling issues. The working group chairmen presented the working group results at the workshop and have also submitted short memos to SKB. The present document is a compilation of these memos. The SKB generic programme as presented in the existing top level documents, 'Requirements and Criteria and Overall Programme', received general endorsement and was appreciated for being comprehensive and systematic. For example, it contains comprehensive lists of parameters to be measured. However, there is need for prioritisation and sequencing. This is actually included in the current planning process at SKB where the generic programme later this year will be adapted to

  9. Remaining Sites Verification Package for 100-F-38 Stained Soil Site. Attachment to Waste Site Reclassification Form 2004-093

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2006-01-01

    The 100-F-38 Stained Soil site was an area of yellow stained soil that was discovered while excavating a trench for the placement of electrical conduit. The 100-F-38 Stained Soil site meets the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show demonstrate that residual contaminant concentrations support future unrestricted land uses that can be represented by a rural-residential scenario. The results also show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils and the contaminant concentrations remaining in the soil are protective of groundwater and the Columbia River

  10. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  11. Site characterization and validation

    International Nuclear Information System (INIS)

    Olsson, O.; Eriksson, J.; Falk, L.; Sandberg, E.

    1988-04-01

    The borehole radar investigation program of the SCV-site (Site Characterization and Validation) has comprised single hole reflection measurements with centre frequencies of 22, 45, and 60 MHz. The radar range obtained in the single hole reflection measurements was approximately 100 m for the lower frequency (22 MHz) and about 60 m for the centre frequency 45 MHz. In the crosshole measurements transmitter-receiver separations from 60 to 200 m have been used. The radar investigations have given a three dimensional description of the structure at the SCV-site. A generalized model of the site has been produced which includes three major zones, four minor zones and a circular feature. These features are considered to be the most significant at the site. Smaller features than the ones included in the generalized model certainly exist but no additional features comparable to the three major zones are thought to exist. The results indicate that the zones are not homogeneous but rather that they are highly irregular containing parts of considerably increased fracturing and parts where their contrast to the background rock is quite small. The zones appear to be approximately planar at least at the scale of the site. At a smaller scale the zones can appear quite irregular. (authors)

  12. Butterfly Assemblages Associated with Invasive Tamarisk (Tamarix spp.) Sites: Comparisons with Tamarisk Control and Native Vegetation Reference Sites

    OpenAIRE

    S. Mark Nelson; Rick Wydoski

    2013-01-01

    We studied butterfly assemblages at six types of riparian landscapes in five different watersheds in the southwestern United States (n=34 sites). Sites included exotic-invasive Tamarix ramosissima (tamarisk) dominated sites; sites where tamarisk was controlled, but not actively revegetated; sites revegetated with upland plants; sites where control was followed with riparian plant revegetation; native riparian vegetation sites; and sites that were a mixture of native and tamarisk vegetations. ...

  13. Confidence assessment. Site descriptive modelling SDM-Site Forsmark

    International Nuclear Information System (INIS)

    2008-09-01

    The objective of this report is to assess the confidence that can be placed in the Forsmark site descriptive model, based on the information available at the conclusion of the surface-based investigations (SDM-Site Forsmark). In this exploration, an overriding question is whether remaining uncertainties are significant for repository engineering design or long-term safety assessment and could successfully be further reduced by more surface based investigations or more usefully by explorations underground made during construction of the repository. The confidence in the Forsmark site descriptive model, based on the data available at the conclusion of the surface-based site investigations, have been assessed by exploring: Confidence in the site characterisation data base; Key remaining issues and their handling; Handling of alternative models; Consistency between disciplines; and, Main reasons for confidence and lack of confidence in the model. It is generally found that the key aspects of importance for safety assessment and repository engineering of the Forsmark site descriptive model are associated with a high degree of confidence. Because of the robust geological model that describes the site, the overall confidence in Forsmark site descriptive model is judged to be high. While some aspects have lower confidence this lack of confidence is handled by providing wider uncertainty ranges, bounding estimates and/or alternative models. Most, but not all, of the low confidence aspects have little impact on repository engineering design or for long-term safety. Poor precision in the measured data are judged to have limited impact on uncertainties on the site descriptive model, with the exceptions of inaccuracy in determining the position of some boreholes at depth in 3-D space, as well as the poor precision of the orientation of BIPS images in some boreholes, and the poor precision of stress data determined by overcoring at the locations where the pre

  14. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  15. Site vegetation report: Terrestrial vegetation survey (1993--1995) for the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1997-06-01

    The Ecological Monitoring Program (EcMP) was designed to investigate the long-term ecological trends in terrestrial and aquatic ecosystems at the US Department of energy's (DOE's) Rocky Flats Environmental Technology Site (Site) (DOE 1993). Field sampling was conducted during 1993, 1994, and 1995, until the program was terminated in late 1995. This report presents the terrestrial vegetation data that were gathered by the EcMP. The site is located on the Colorado Piedmont, east of the Front Range, between Boulder and Golden, approximately 25 km (16 miles) northwest of Denver. The topography and proximity of the Site to the mountain front result in an interesting mixture of prairie and mountain plant species. The Site is one of the few large, relatively undisturbed areas of its kind that remains along the Colorado Piedmont. Until 1989, the primary mission of the Site was the production of nuclear weapons components (DOE 1993). After production ceased, Site personnel shifted their focus to cleanup and closure

  16. Site vegetation report: Terrestrial vegetation survey (1993--1995) for the Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Ecological Monitoring Program (EcMP) was designed to investigate the long-term ecological trends in terrestrial and aquatic ecosystems at the US Department of energy`s (DOE`s) Rocky Flats Environmental Technology Site (Site) (DOE 1993). Field sampling was conducted during 1993, 1994, and 1995, until the program was terminated in late 1995. This report presents the terrestrial vegetation data that were gathered by the EcMP. The site is located on the Colorado Piedmont, east of the Front Range, between Boulder and Golden, approximately 25 km (16 miles) northwest of Denver. The topography and proximity of the Site to the mountain front result in an interesting mixture of prairie and mountain plant species. The Site is one of the few large, relatively undisturbed areas of its kind that remains along the Colorado Piedmont. Until 1989, the primary mission of the Site was the production of nuclear weapons components (DOE 1993). After production ceased, Site personnel shifted their focus to cleanup and closure.

  17. Procedural justice in wind facility siting: Recommendations for state-led siting processes

    International Nuclear Information System (INIS)

    Ottinger, Gwen; Hargrave, Timothy J.; Hopson, Eric

    2014-01-01

    Evidence suggests that state control of wind facility siting decisions fosters new project development more effectively than local control, yet the literature suggests that affected citizens tend to be more fairly represented in local siting processes. We argue that successful renewable energy policy must satisfy both the need for new project development and the obligation to procedural justice. To suggest how it can do so, we analyze existing state- and county-level siting processes in Washington state, finding that both fall short on measures of procedural justice. To overcome this limitation and address the tension between procedural justice and project development, we then propose a collaborative governance approach to wind facility siting, in which state governments retain ultimate authority over permitting decisions but encourage and support local-level deliberations as the primary means of making those decisions. Such an approach, we argue, would be more just, facilitate wind development by addressing community concerns constructively and result in better projects through the input of diverse stakeholders. - Highlights: • States have made wind energy development a priority. • Local opposition to new projects could hinder future wind energy development. • Procedural justice is necessary to resolve local issues and ensure timely wind facility siting. • Both state- and county-led siting processes fall short with respect to criteria for procedural justice, though local processes have some advantages. • States could instead induce counties, developers to engage in deliberation

  18. Catalytic site identification—a web server to identify catalytic site structural matches throughout PDB

    Science.gov (United States)

    Kirshner, Daniel A.; Nilmeier, Jerome P.; Lightstone, Felice C.

    2013-01-01

    The catalytic site identification web server provides the innovative capability to find structural matches to a user-specified catalytic site among all Protein Data Bank proteins rapidly (in less than a minute). The server also can examine a user-specified protein structure or model to identify structural matches to a library of catalytic sites. Finally, the server provides a database of pre-calculated matches between all Protein Data Bank proteins and the library of catalytic sites. The database has been used to derive a set of hypothesized novel enzymatic function annotations. In all cases, matches and putative binding sites (protein structure and surfaces) can be visualized interactively online. The website can be accessed at http://catsid.llnl.gov. PMID:23680785

  19. Site environmental report summary

    International Nuclear Information System (INIS)

    1992-01-01

    In this summary of the Fernald 1992 Site Environmental Report the authors will describe the impact of the Fernald site on man and the environment and provide results from the ongoing Environmental Monitoring Program. Also included is a summary of the data obtained from sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. These requirements are set to protect both man and the environment

  20. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Non-NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Non-NPL Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a...

  1. Nevada National Security Site Environmental Report 2010, Attachment A: Site Description

    Energy Technology Data Exchange (ETDEWEB)

    C. Wills, ed.

    2011-09-13

    Introduction to the Nevada National Security Site Environmental Report 2010. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  2. Allegheny County Illegal Dump Sites

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — The Illegal Dump Site dataset includes information on illegal dump sites, their type of trash, and the estimate tons of trash at each site. The information was...

  3. Ecological restoration of Central European mining sites: a summary of a multi-site analysis

    Energy Technology Data Exchange (ETDEWEB)

    Prach, K.; Rehounkova, K.; Rehounek, J.; Konvalinkova, P. [University of South Bohemia, Ceske Budejovice (Czech Republic)

    2011-07-01

    Sites disturbed by mining were surveyed in the Czech Republic, central Europe. The sites included spoil heaps from coal mining, sand and gravel pits, extracted peatlands and stone quarries. The following main conclusions emerged: I) potential for spontaneous succession to be used in restoration projects is between 95 and 100% of the total area disturbed; ii) mining sites, if mining is properly designed and then the sites are left to spontaneous succession, often act as refugia for endangered and retreating organisms, and may contribute substantially to local biodiversity.

  4. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  5. Site-to-site genetic correlations and their implications on breeding zone size and optimum number of progeny test sites for Coastal Douglas-fir.

    Science.gov (United States)

    G.R. Johnson

    1997-01-01

    Type B genetic correlations were used to examine the relation among geographic differences between sites and their site-to-site genetic (Type B) correlations. Examination of six local breeding zones in Oregon indicated that breeding zones were, for the most part, not too large because few environmental variables were correlated with Type B genetic correlations. The...

  6. Geological discrete fracture network model for the Laxemar site. Site Descriptive Modelling. SDM-Site Laxemar

    Energy Technology Data Exchange (ETDEWEB)

    La Pointe, Paul; Fox, Aaron (Golder Associates Inc (United States)); Hermanson, Jan; Oehman, Johan (Golder Associates AB, Stockholm (Sweden))

    2008-12-15

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is performing site characterization at two different locations, Forsmark and Laxemar, in order to locate a site for a final geologic repository for spent nuclear fuel. The program is built upon the development of Site Descriptive Models (SDMs) at specific timed data freezes. Each SDM is formed from discipline-specific reports from across the scientific spectrum. This report describes the methods, analyses, and conclusions of the modelling team in the production of the SDM-Site Laxemar geological discrete-fracture network (DFN) model. The DFN builds upon the work of other geological models, including the deformation zone and rock domain models. The geological DFN is a statistical model for stochastically simulating rock fractures and minor deformation zones at a scale of less than 1,000 m (the lower cut-off of the DZ models). The geological DFN is valid within six distinct fracture domains inside the Laxemar local model subarea: FSM{sub C}, FSM{sub E}W007, FSM{sub N}, FSM{sub N}E005, FSM{sub S}, and FSM{sub W}. The models are built using data from detailed surface outcrop maps, geophysical lineament maps, and the cored borehole record at Laxemar. The conceptual model for the SDM-Site Laxemar geological DFN model revolves around the identification of fracture domains based on relative fracture set intensities, orientation clustering, and the regional tectonic framework (including deformation zones). A single coupled fracture size/fracture intensity concept (the Base Model) based on a Pareto (power-law) distribution for fracture sizes was chosen as the recommended parameterisation. A slew of alternative size-intensity models were also carried through the fracture analyses and into the uncertainty and model verification analyses. Uncertainty is modelled by analysing the effects on fracture intensity (P32) that alternative model cases can have. Uncertainty is parameterised as a ratio between the P32 of the

  7. Geological discrete fracture network model for the Laxemar site. Site Descriptive Modelling. SDM-Site Laxemar

    International Nuclear Information System (INIS)

    La Pointe, Paul; Fox, Aaron; Hermanson, Jan; Oehman, Johan

    2008-10-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is performing site characterization at two different locations, Forsmark and Laxemar, in order to locate a site for a final geologic repository for spent nuclear fuel. The program is built upon the development of Site Descriptive Models (SDMs) at specific timed data freezes. Each SDM is formed from discipline-specific reports from across the scientific spectrum. This report describes the methods, analyses, and conclusions of the modelling team in the production of the SDM-Site Laxemar geological discrete-fracture network (DFN) model. The DFN builds upon the work of other geological models, including the deformation zone and rock domain models. The geological DFN is a statistical model for stochastically simulating rock fractures and minor deformation zones at a scale of less than 1,000 m (the lower cut-off of the DZ models). The geological DFN is valid within six distinct fracture domains inside the Laxemar local model subarea: FSM C , FSM E W007, FSM N , FSM N E005, FSM S , and FSM W . The models are built using data from detailed surface outcrop maps, geophysical lineament maps, and the cored borehole record at Laxemar. The conceptual model for the SDM-Site Laxemar geological DFN model revolves around the identification of fracture domains based on relative fracture set intensities, orientation clustering, and the regional tectonic framework (including deformation zones). A single coupled fracture size/fracture intensity concept (the Base Model) based on a Pareto (power-law) distribution for fracture sizes was chosen as the recommended parameterisation. A slew of alternative size-intensity models were also carried through the fracture analyses and into the uncertainty and model verification analyses. Uncertainty is modelled by analysing the effects on fracture intensity (P32) that alternative model cases can have. Uncertainty is parameterised as a ratio between the P32 of the alternative model and the P

  8. Double tracks test site characterization report

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents the results of site characterization activities performed at the Double Tracks Test Site, located on Range 71 North, of the Nellis Air Force Range (NAFR) in southern Nevada. Site characterization activities included reviewing historical data from the Double Tracks experiment, previous site investigation efforts, and recent site characterization data. The most recent site characterization activities were conducted in support of an interim corrective action to remediate the Double Tracks Test Site to an acceptable risk to human health and the environment. Site characterization was performed using a phased approach. First, previously collected data and historical records sere compiled and reviewed. Generalized scopes of work were then prepared to fill known data gaps. Field activities were conducted and the collected data were then reviewed to determine whether data gaps were filled and whether other areas needed to be investigated. Additional field efforts were then conducted, as required, to adequately characterize the site. Characterization of the Double Tracks Test Site was conducted in accordance with the US Department of Energy's (DOE) Streamlined Approach for Environmental Restoration (SAFER)

  9. Comparison of the Radionuclides Dispersion at the UAE Barakah Site with that at the ROK Shin-Kori Site - Comparison of the radionuclides dispersion in Barakah site with that in Shin-Kori site

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung-yeop; Lee, Kun Jai; Chang, Soon Heung [Korea Advanced Institute of Science and Technology, 291 Daehak-ro, Yuseong-gu, Daejeon, 305-701 (Korea, Republic of); Beeley, Philip A. [Khalifa University of Science, Technology and Research, P.O. Box 127788, Abu Dhabi (United Arab Emirates)

    2014-07-01

    In order to understand the characteristics of atmospheric dispersion of radionuclides in the desert environment of Barakah site in UAE, comparison research with the results of other environments could be an appropriate way to facilitate it. Shin-Kori site is the proper comparison target because same reactor type of APR1400 with that in Barakah site is under construction. Hypothetical accident scenario was considered and accident source term which had been developed in previous research has been applied as releasing source. After reviewing several computation codes, ADMS5 has been selected as an atmospheric dispersion modeling tool which is installing advanced Gaussian plum model and plentiful options. The climate data of both Barakah and Shin-Kori were acquired and the environments of both sites have been simulated considering wind speed, wind direction, temperature, humidity, ground surface roughness and etc. Near field final human doses on the maps have been schematised regarding statistical meteorological data of both sites and dose conversion factors from the publications of ICRP and federal guidance report of EPA. The results of this research are expected to enhance the understanding about differences between two environments which have same reactor type and to improve the comprehension of desert environment of Barakah site as well. Applying different dose conversion factors to Barakah site considering the desert biosphere could be further study to obtain more accurate results. (authors)

  10. Remaining Sites Verification Package for the 100-D-9 Boiler Fuel Oil Tank Site. Attachment to Waste Site Reclassification Form 2006-030

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 100-D-9 site is the former location of an underground storage tank used for holding fuel for the 184-DA Boiler House. Results of soil-gas samples taken from six soil-gas probes in a rectangle around the site the tank had been removed from concluded that there were no volatile organic compounds at detectable levels in the area. The 100-D-9 Boiler Fuel Oil Tank Site meets the remedial action objectives specified in the Remaining Sites ROD. The results demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  11. Integrated account of method, site selection and programme prior to the site investigation phase

    International Nuclear Information System (INIS)

    2000-12-01

    In order to dispose of the spent nuclear fuel in a safe manner, SKB plans to site a deep repository and an encapsulation plant with associated canister fabrication and transportation system. After an integrated evaluation of feasibility studies and other material, SKB will proceed with investigations of the rock and studies regarding establishment of the deep disposal system in the municipality of Oskarshamn or in Northern Uppland. The plans also include further study of the prospects for a deep repository in the municipality of Nykoeping. In the municipality of Oskarshamn, SKB plans further studies of a siting of the deep repository at Simpevarp. There SKB wants to initiate site investigations with test drilling. For the encapsulation plant, SKB wants to continue studying a siting at CLAB. In Northern Uppland, SKB plans to study two siting alternatives for the deep repository. One is Forsmark in the municipality of Oesthammar, where SKB wants to initiate a site investigation with test drilling. The other is Tierp north of Skutskaer, where SKB intends to start test drilling in an area north of Tierp. First, however, a suitable drilling area with possible transport solutions needs to be defined. This alternative requires the participation of the municipalities of both Tierp and Aelvkarleby. A siting of the encapsulation plant in Northern Uppland will also be studied. For the municipality of Nykoeping, SKB plans to conduct a new safety assessment for the Fjaellveden area, based on data from previous investigations as well as additional studies of how a deep repository could be arranged. SKB will thereby gather data from yet another geographic and geological region beyond those that are prioritized. No test drilling is planned in Nykoeping. The goal of the site investigation phase is to obtain all permits needed to build the planned facilities. It will take an estimated 7 - 8 years to assemble the requisite supporting material, carry out consultations, compile siting

  12. The Savannah River site`s groundwater monitoring program: second quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  13. Measuring site occupancy

    DEFF Research Database (Denmark)

    Rogowska-Wrzesinska, Adelina; Wojdyla, Katarzyna; Williamson, James

    2014-01-01

    occupancy of the modification site. We show that, on one hand, heavily modified cysteines are not necessarily involved in the response to oxidative stress. On the other hand residues with low modification level can be dramatically affected by mild oxidative imbalance. We make use of high resolution mass...... peptides corresponding to 90 proteins. Only 6 modified peptides changed significantly under mild oxidative stress. Quantitative information allowed us to determine relative modification site occupancy of each identified modified residue and pin point heavily modified ones. The method proved to be precise...... and sensitive enough to detect and quantify endogenous levels of oxidative stress on proteome-wide scale and brings a new perspective on the role of the modification site occupancy in cellular redox response....

  14. Criteria of site assessment

    International Nuclear Information System (INIS)

    Gibbs, P.; Fuchs, H.

    1975-01-01

    The criteria which lead to the choice of a particular site for a nuclear power station are in general very similar to those which would apply to any other type of power station. The principal differences derive from the simpler transport problems for the fuel compared with, say, solid fuel and the special safety considerations which attach to nuclear reactors. The search for a suitable site obviously starts by considering where the power is needed, i.e. where the load centers are and also the existing transmission network which may help to bring the power from a more remote site to the load centers. This economic incentive to put the plant close to loads conflicts directly with the nuclear safety argument which favours more remote siting, and part of the problem of site selection is to reconcile these two matters. In addition, there are many other important matters which will be considered later concerning the adequacy of cooling water supplies, foundation conditions, etc., all of which must be examined in considerable detail. (orig./TK) [de

  15. 78 FR 26005 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-05-03

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  16. 78 FR 65979 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-11-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 77 FR 24695 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-04-25

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. . 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  18. 77 FR 60688 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-10-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  19. 77 FR 13104 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-03-05

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  20. 77 FR 39235 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-07-02

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  1. 78 FR 716 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-01-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  2. 78 FR 54461 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-09-04

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  3. 77 FR 53193 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2012-08-31

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  4. Site scientific mission plan for the Southern Great Plains CART site: July--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1997-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  5. Structuring a cost-effective site characterization

    International Nuclear Information System (INIS)

    Berven, B.A.; Little, C.A.; Swaja, R.E.

    1990-01-01

    Successful chemical and radiological site characterizations are complex activities which require meticulously detailed planning. Each layer of investigation is based upon previously generated information about the site. Baseline historical, physical, geological, and regulatory information is prerequisite for preliminary studies at a site. Preliminary studies then provide samples and measurements which define the identity of potential contaminants and define boundaries around the area to be investigated. The goal of a full site characterization is to accurately determine the extent and magnitude of contaminants and carefully define the site conditions such that the future movements of site contaminants can be assessed for potential exposure to human occupants and/or environmental impacts. Critical to this process is the selection of appropriate measurement and sampling methodology, selection and use of appropriate instrumentation and management/interpretation of site information. Site investigations require optimization between the need of information to maximize the understanding of site conditions and the cost of acquiring that information. 5 refs., 1 tab

  6. Report of JLC site study group

    CERN Document Server

    Hasegawa, T; Yamashita, S

    2003-01-01

    This study group selected some good sites for construction of JLC (Electron-Positron Linear Collider) on the basis of investigation of data and field survey. The aims, activity, use of underground of private land, conditions of site, selection of site at present and future, summary and proposal are reported. 9 sites (Hidaka, Kitakami, Murayama, Abukuma, Kitaibaraki, Aichi and Gifu, Takamatsu, Hiroshima and Seburi range) are selected for the construction on the basis of firm ground and 4 sites (Okinawa, Harima, Tsukuba and Mutsuogawara) for development and researches. 9 sites area consists of plutonic rock or old strata of Paleozoic era. Many problems in each site are reported. There are three following proposals; 1) the self-governing communities of the sites have to understand JLC and start to construct it by information, 2) a site evaluation committee consists of specialist of civil engineering, building, social and natural environment and disaster prevention and 3) the vibration test should be carried out ...

  7. Siting the superconducting super collider

    International Nuclear Information System (INIS)

    Price, R.; Rooney, R.C.

    1988-01-01

    At the request of the Department of Energy, the National Academy of Sciences and the National Academy of Engineering established the Super Collider Site Evaluation Committee to evaluate the suitability of proposed sites for the Superconducting Super Collider. Thirty-six proposals were examined by the committee. Using the set of criteria announced by DOE in its Invitation for Site Proposals, the committee identified eight sites that merited inclusion on a ''best qualified list.'' The list represents the best collective judgment of 21 individuals, carefully chosen for their expertise and impartiality, after a detailed assessment of the proposals using 19 technical subcriteria and DOE's life cycle cost estimates. The sites, in alphabetical order, are: Arizona/Maricopa; Colorado; Illinois; Michigan/Stockbridge; New York/Rochester; North Carolina; Tennessee; and Texas/Dallas-Fort Worth. The evaluation of these sites and the Superconducting Super Collider are discussed in this book

  8. Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York

    International Nuclear Information System (INIS)

    1990-05-01

    IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs

  9. Closure report for CAU No. 450: Historical UST release sites, Nevada Test Site. Volume 1

    International Nuclear Information System (INIS)

    1997-09-01

    This report addresses the closure of 11 historical underground storage tank (UST) release sites within various areas of the Nevada Test Site (NTS). The closure of each hydrocarbon release has not been documented, therefore, this report addresses the remedial activities completed for each release site. The hydrocarbon release associated with each tank site within CAU 450 was remediated by excavating the impacted soil. Clean closure of the release was verified through soil sample analysis by an off-site laboratory. All release closure activities were completed following standard environmental and regulatory guidelines. Based upon site observations during the remedial activities and the soil sample analytical results, which indicated that soil concentrations were below the Nevada Administrative code (NAC) Action Level of 100 mg/kg, it is anticipated that each of the release CASs be closed without further action

  10. Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs.

  11. Site survey for nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide describes the first stage of the siting process for nuclear power plants - the site survey to select one or more preferred candidate sites. Its purpose is to recommend procedures and provide information for use in implementing a part of the Code of Practice on Safety in Nuclear Power Plant Siting (IAEA Safety Series No.50-C-S). The organization, procedures, methodologies, guidance for documenting the site survey process and examples of detailed procedures on some safety-related site characteristics are given in the Guide

  12. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  13. Introduction to the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report discusses the Site mission and provides general information about the site. The U.S. DOE has established a new mission for Hanford including: Management of stored wastes, environmental restoration, research and development, and development of new technologies. The Hanford Reservation is located in south central Washington State just north of the confluence of the Snake and Yakima Rivers with the Columbia River. The approximately 1,450 square kilometers which comprises the Hanford Site, with restricted public access, provides a buffer for the smaller areas within the site which have historically been used for the production of nuclear materials, radioactive waste storage, and radioactive waste disposal.

  14. Hanford Site sustainable development initiatives

    International Nuclear Information System (INIS)

    Sullivan, C.T.

    1994-05-01

    Since the days of the Manhattan Project of World War II, the economic well being of the Tri-Cities (Pasco, Kennewick, and Richland) of Washington State has been tied to the US Department of Energy missions at the nearby Hanford Site. As missions at the Site changed, so did the economic vitality of the region. The Hanford Site is now poised to complete its final mission, that of environmental restoration. When restoration is completed, the Site may be closed and the effect on the local economy will be devastating if action is not taken now. To that end, economic diversification and transition are being planned. To facilitate the process, the Hanford Site will become a sustainable development demonstration project

  15. Introduction to the Hanford Site

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report discusses the Site mission and provides general information about the site. The U.S. DOE has established a new mission for Hanford including: Management of stored wastes, environmental restoration, research and development, and development of new technologies. The Hanford Reservation is located in south central Washington State just north of the confluence of the Snake and Yakima Rivers with the Columbia River. The approximately 1,450 square kilometers which comprises the Hanford Site, with restricted public access, provides a buffer for the smaller areas within the site which have historically been used for the production of nuclear materials, radioactive waste storage, and radioactive waste disposal

  16. 78 FR 40130 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-07-03

    ...This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Savannah River Site. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.

  17. 78 FR 16260 - Environmental Management Site-Specific Advisory Board, Savannah River Site

    Science.gov (United States)

    2013-03-14

    ...On March 4, 2013, the Department of Energy (DOE) published a notice of open meeting announcing a meeting on March 25-26, 2013 of the Environmental Management Site-Specific Advisory Board, Savannah River Site (78 FR 14088). This document makes a correction to that notice.

  18. Management strategy for site characterization at candidate HLW repository sites

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1988-01-01

    This paper describes a management strategy for HLW repository site characterization which is aimed at producing an optimal characterization trajectory for site suitability and licensing evaluations. The core feature of the strategy is a matrix of alternative performance targets and alternative information-level targets which can be used to allocate and justify program effort. Strategies for work concerning evaluation of expected and disrupted repository performance are distinguished, and the need for issue closure criteria is discussed

  19. SiteChar – Methodology for a Fit-for-Purpose Assessment of CO2 Storage Sites in Europe

    Directory of Open Access Journals (Sweden)

    Delprat-Jannaud F.

    2015-04-01

    Full Text Available The FP7-funded SiteChar project examined the entire CO2 geological storage site characterisation process, from the initial feasibility studies through to the final stage of application for a CO2 storage permit based on criteria defined by the relevant European legislation. The SiteChar workflow for CO2 geological storage site characterisation provides a description of all elements of a site characterisation study, as well as guidance to streamline the site characterisation process and make sure that the output covers the aspects mentioned in the European Community (EC Storage Directive. Five potential European storage sites, representative of prospective geological contexts, were considered as test sites for the research work: a North Sea multi-store site (hydrocarbon field and aquifer offshore Scotland; an onshore aquifer in Denmark; an onshore gas field in Poland; an aquifer offshore in Norway; and an aquifer in the Southern Adriatic Sea. This portfolio combines complementary sites that allowed to encompass the different steps of the characterisation workflow. A key innovation was the development of internal ‘dry-run’ permit applications at the Danish and Scottish sites and their review by relevant regulatory authorities. This process helped to refine the site characterisation workflow, and aimed to identify remaining gaps in site-specific characterisation, needed to secure storage permits under the EC Storage Directive as implemented in ‘host’ Member States. SiteChar considered the important aspect of the public awareness and public opinions of these new technologies, in parallel to technical issues, on the onshore Polish and offshore Scottish sites. A new format to assist public opinion-forming processes was tested involving a small sample of local communities. Generic as well as site-specific information was made available to the general and local public via the internet and at information meetings. These exercises provide insight

  20. Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site, Waste Site Reclassification Form 2008-031

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2008-12-01

    The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  1. Air cleaning issues with contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    Bellamy, R.R. [Nuclear Regulatory Commission, King of Prussia, PA (United States)

    1997-08-01

    The US Nuclear Regulatory Commission has developed a list of contaminated sites that warrant special USNRC attention because they pose unique or complex decommissioning issues. This list of radiologically contaminated sites is termed the Site Decommissioning Management Plan (SDMP), and was first issued in 1990. A site is placed on the SDMP list if it has; (1) Problems with the viability of the responsible organization (e.g., the licensee for the site is unable or unwilling to pay for the decommissioning); (2) Large amounts of soil contamination or unused settling ponds or burial grounds that may make the waste difficult to dispose of; (3) The long-term presence of contaminated, unused buildings; (4) A previously terminated license; or (5) Contaminated or potential contamination of the ground water from on-site wastes. In deciding whether to add a site to the SDMP list, the NRC also considers the projected length of time for decommissioning and the willingness of the responsible organization to complete the decommissioning in a timely manner. Since the list was established, 9 sites have been removed from the list, and the current SDMP list contains 47 sites in 11 states. The USNRC annually publishes NUREG-1444, {open_quotes}Site Decommissioning Management Plan{close_quotes}, which updates the status of each site. This paper will discuss the philosophical goals of the SDMP, then will concentrate on the regulatory requirements associated with air cleaning issues at the SDMP sites during characterization and remediation. Both effluent and worker protection issues will be discussed. For effluents, the source terms at sites will be characterized, and measurement techniques will be presented. Off-site dose impacts will be included. For worker protection issues, air sampling analyses will be presented in order to show how the workers are adequately protected and their doses measured to satisfy regulatory criteria during decontamination operations. 1 tab.

  2. Thermal Site Descriptive Model. A strategy for the model development during site investigations. Version 1.0

    International Nuclear Information System (INIS)

    Sundberg, Jan

    2003-04-01

    Site investigations are in progress for the siting of a deep repository for spent nuclear fuel. As part of the planning work, strategies are developed for site descriptive modelling regarding different disciplines, amongst them the thermal conditions. The objective of the strategy for a thermal site descriptive model is to guide the practical implementation of evaluating site specific data during the site investigations. It is understood that further development may be needed. The model describes the thermal properties and other thermal parameters of intact rock, fractures and fracture zones, and of the rock mass. The methodology is based on estimation of thermal properties of intact rock and discontinuities, using both empirical and theoretical/numerical approaches, and estimation of thermal processes using mathematical modelling. The methodology will be used and evaluated for the thermal site descriptive modelling at the Aespoe Hard Rock Laboratory

  3. Retroviral integration: Site matters

    Science.gov (United States)

    Demeulemeester, Jonas; De Rijck, Jan

    2015-01-01

    Here, we review genomic target site selection during retroviral integration as a multistep process in which specific biases are introduced at each level. The first asymmetries are introduced when the virus takes a specific route into the nucleus. Next, by co‐opting distinct host cofactors, the integration machinery is guided to particular chromatin contexts. As the viral integrase captures a local target nucleosome, specific contacts introduce fine‐grained biases in the integration site distribution. In vivo, the established population of proviruses is subject to both positive and negative selection, thereby continuously reshaping the integration site distribution. By affecting stochastic proviral expression as well as the mutagenic potential of the virus, integration site choice may be an inherent part of the evolutionary strategies used by different retroviruses to maximise reproductive success. PMID:26293289

  4. Coal mine site reclamation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-02-15

    Coal mine sites can have significant effects on local environments. In addition to the physical disruption of land forms and ecosystems, mining can also leave behind a legacy of secondary detrimental effects due to leaching of acid and trace elements from discarded materials. This report looks at the remediation of both deep mine and opencast mine sites, covering reclamation methods, back-filling issues, drainage and restoration. Examples of national variations in the applicable legislation and in the definition of rehabilitation are compared. Ultimately, mine site rehabilitation should return sites to conditions where land forms, soils, hydrology, and flora and fauna are self-sustaining and compatible with surrounding land uses. Case studies are given to show what can be achieved and how some landscapes can actually be improved as a result of mining activity.

  5. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  6. Fixed-site physical protection system modeling

    International Nuclear Information System (INIS)

    Chapman, L.D.

    1975-01-01

    An evaluation of a fixed-site safeguard security system must consider the interrelationships of barriers, alarms, on-site and off-site guards, and their effectiveness against a forcible adversary attack whose intention is to create an act of sabotage or theft. A computer model has been developed at Sandia Laboratories for the evaluation of alternative fixed-site security systems. Trade-offs involving on-site and off-site response forces and response times, perimeter alarm systems, barrier configurations, and varying levels of threat can be analyzed. The computer model provides a framework for performing inexpensive experiments on fixed-site security systems for testing alternative decisions, and for determining the relative cost effectiveness associated with these decision policies

  7. Savannah River Site computing architecture

    Energy Technology Data Exchange (ETDEWEB)

    1991-03-29

    A computing architecture is a framework for making decisions about the implementation of computer technology and the supporting infrastructure. Because of the size, diversity, and amount of resources dedicated to computing at the Savannah River Site (SRS), there must be an overall strategic plan that can be followed by the thousands of site personnel who make decisions daily that directly affect the SRS computing environment and impact the site`s production and business systems. This plan must address the following requirements: There must be SRS-wide standards for procurement or development of computing systems (hardware and software). The site computing organizations must develop systems that end users find easy to use. Systems must be put in place to support the primary function of site information workers. The developers of computer systems must be given tools that automate and speed up the development of information systems and applications based on computer technology. This document describes a proposal for a site-wide computing architecture that addresses the above requirements. In summary, this architecture is standards-based data-driven, and workstation-oriented with larger systems being utilized for the delivery of needed information to users in a client-server relationship.

  8. Regional energy facility siting analysis

    International Nuclear Information System (INIS)

    Eberhart, R.C.; Eagles, T.W.

    1976-01-01

    Results of the energy facility siting analysis portion of a regional pilot study performed for the anticipated National Energy Siting and Facility Report are presented. The question of cell analysis versus site-specific analysis is explored, including an evaluation of the difference in depth between the two approaches. A discussion of the possible accomplishments of regional analysis is presented. It is concluded that regional sitting analysis could be of use in a national siting study, if its inherent limits are recognized

  9. Geological evolution, palaeoclimate and historical development of the Forsmark and Laxemar-Simpevarp areas. Site descriptive modelling SDM-Site

    Energy Technology Data Exchange (ETDEWEB)

    Soederbaeck, Bjoern [ed.

    2008-06-15

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is undertaking site characterization at two different locations, the Forsmark and Laxemar-Simpevarp areas, with the objective of siting a geological repository for spent nuclear fuel. The site investigations started in 2002 and were completed in 2007. The analysis and modelling of data from the site investigations, which have taken place during and after these investigations, provide a foundation for the development of an integrated, multidisciplinary site descriptive model (SDM) for each of the two sites. A site descriptive model constitutes a description of the site and its regional setting, covering the current state of the geosphere and the biosphere, as well as those natural processes that affect or have affected their long-term development. Hitherto, a number of reports presenting preliminary site descriptive models for Forsmark and Laxemar-Simpevarp have been published. In these reports, the evolutionary and historical aspects of the site were included in a separate chapter. The present report comprises a further elaboration of the evolutionary and historical information included in the preliminary SDM reports, but presented here in a separate, supplementary report to the final site description, SDM-Site. The report is common to the two investigated areas, and the overall objective is to describe the long-term geological evolution, the palaeoclimate, and the post-glacial development of ecosystems and of the human population at the two sites. The report largely consists of a synthesis of information derived from the scientific literature and other sources not related to the site investigations. However, considerable information from the site investigations that has contributed to our understanding of the past development at each site is also included. This unique synthesis of both published information in a regional perspective and new site-specific information breaks new ground in our understanding

  10. Geological evolution, palaeoclimate and historical development of the Forsmark and Laxemar-Simpevarp areas. Site descriptive modelling SDM-Site

    International Nuclear Information System (INIS)

    Soederbaeck, Bjoern

    2008-06-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is undertaking site characterization at two different locations, the Forsmark and Laxemar-Simpevarp areas, with the objective of siting a geological repository for spent nuclear fuel. The site investigations started in 2002 and were completed in 2007. The analysis and modelling of data from the site investigations, which have taken place during and after these investigations, provide a foundation for the development of an integrated, multidisciplinary site descriptive model (SDM) for each of the two sites. A site descriptive model constitutes a description of the site and its regional setting, covering the current state of the geosphere and the biosphere, as well as those natural processes that affect or have affected their long-term development. Hitherto, a number of reports presenting preliminary site descriptive models for Forsmark and Laxemar-Simpevarp have been published. In these reports, the evolutionary and historical aspects of the site were included in a separate chapter. The present report comprises a further elaboration of the evolutionary and historical information included in the preliminary SDM reports, but presented here in a separate, supplementary report to the final site description, SDM-Site. The report is common to the two investigated areas, and the overall objective is to describe the long-term geological evolution, the palaeoclimate, and the post-glacial development of ecosystems and of the human population at the two sites. The report largely consists of a synthesis of information derived from the scientific literature and other sources not related to the site investigations. However, considerable information from the site investigations that has contributed to our understanding of the past development at each site is also included. This unique synthesis of both published information in a regional perspective and new site-specific information breaks new ground in our understanding

  11. Application for Permit to Operate a Class II Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-03-31

    The Nevada Test Site (NTS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NTS and National Security Technologies LLC (NSTec) is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The site will be used for the disposal of refuse, rubbish, garbage, sewage sludge, pathological waste, Asbestos-Containing Material (ACM), industrial solid waste, hydrocarbon-burdened soil, hydrocarbon-burdened demolition and construction waste, and other inert waste (hereafter called permissible waste). Waste containing free liquids or regulated under Subtitle C of the Resource Conservation and Recovery Act (RCRA) will not be accepted for disposal at the site. Waste regulated under the Toxic Substance Control Act (TSCA), excluding Polychlorinated Biphenyl [PCB], Bulk Product Waste (see Section 6.2.5) and ACM (see Section 6.2.2.2) will not be accepted for disposal at the site. The disposal site will be used as the sole depository of permissible waste which is: (1) Generated by entities covered under the U.S. Environmental Protection Agency (EPA) Hazardous Waste Generator Identification Number for the NTS; (2) Generated at sites identified in the Federal Facilities Agreement and Consent Order (FFACO); (3) Sensitive records and media, including documents, vugraphs, computer disks, typewriter ribbons, magnetic tapes, etc., generated by NNSA/NSO or its contractors; (4) ACM generated by NNSA/NSO or its contractors according to Section 6.2.2.2, as necessary; (5) Hydrocarbon-burdened soil and solid waste from areas covered under the EPA Hazardous Waste Generator Identification Number for the NTS; (6) Other waste on a case-by-case concurrence by

  12. Remaining Sites Verification Package for the 600-233 Waste Site, Vertical Pipe Near 100-B Electrical Laydown Area. Attachment to Waste Site Reclassification Form 2005-041

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2005-01-01

    The 600-233 waste site consisted of three small-diameter pipelines within the 600-232 waste site, including previously unknown diesel fuel supply lines discovered during site remediation. The 600-233 waste site has been remediated to achieve the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  13. Site characterization plan overview: reference repository location, Hanford Site, Washington: Consultation draft: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    As part of the process for siting the nation's first geologic repository for radioactive waste, the Department of Energy (DOE) is preparing a site characterization plan for the Hanford site in Benton County, Washington. As a step in the preparation of that plan, the DOE has provided, for information and review, a consultation draft of the plan to the State of Washington, the affected Indian Tribes - the Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Indian Tribe, and the Yakima Indian Nation - and the US Nuclear Regulatory Commission. The Hanford site is one of three sites that the DOE currently plans to characterize;the other sites are the Deaf Smith County site in Texas and the Yucca Mountain site in Nevada. After site characterization has been completed and its results evaluated, the DOE will identify from among the three characterized sites the site that is preferred for the repository. The overview presented here consists of brief summaries of important topics covered in the consulation draft of the site characterization plan;it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with breif descriptions of the dispoal system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Hanford site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization

  14. Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, Ruben P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, Wendy [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-04

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  15. A Bayesian belief network approach for assessing uncertainty in conceptual site models at contaminated sites

    Science.gov (United States)

    Thomsen, Nanna I.; Binning, Philip J.; McKnight, Ursula S.; Tuxen, Nina; Bjerg, Poul L.; Troldborg, Mads

    2016-05-01

    A key component in risk assessment of contaminated sites is in the formulation of a conceptual site model (CSM). A CSM is a simplified representation of reality and forms the basis for the mathematical modeling of contaminant fate and transport at the site. The CSM should therefore identify the most important site-specific features and processes that may affect the contaminant transport behavior at the site. However, the development of a CSM will always be associated with uncertainties due to limited data and lack of understanding of the site conditions. CSM uncertainty is often found to be a major source of model error and it should therefore be accounted for when evaluating uncertainties in risk assessments. We present a Bayesian belief network (BBN) approach for constructing CSMs and assessing their uncertainty at contaminated sites. BBNs are graphical probabilistic models that are effective for integrating quantitative and qualitative information, and thus can strengthen decisions when empirical data are lacking. The proposed BBN approach facilitates a systematic construction of multiple CSMs, and then determines the belief in each CSM using a variety of data types and/or expert opinion at different knowledge levels. The developed BBNs combine data from desktop studies and initial site investigations with expert opinion to assess which of the CSMs are more likely to reflect the actual site conditions. The method is demonstrated on a Danish field site, contaminated with chlorinated ethenes. Four different CSMs are developed by combining two contaminant source zone interpretations (presence or absence of a separate phase contamination) and two geological interpretations (fractured or unfractured clay till). The beliefs in each of the CSMs are assessed sequentially based on data from three investigation stages (a screening investigation, a more detailed investigation, and an expert consultation) to demonstrate that the belief can be updated as more information

  16. Modeling Site Heterogeneity with Posterior Mean Site Frequency Profiles Accelerates Accurate Phylogenomic Estimation.

    Science.gov (United States)

    Wang, Huai-Chun; Minh, Bui Quang; Susko, Edward; Roger, Andrew J

    2018-03-01

    Proteins have distinct structural and functional constraints at different sites that lead to site-specific preferences for particular amino acid residues as the sequences evolve. Heterogeneity in the amino acid substitution process between sites is not modeled by commonly used empirical amino acid exchange matrices. Such model misspecification can lead to artefacts in phylogenetic estimation such as long-branch attraction. Although sophisticated site-heterogeneous mixture models have been developed to address this problem in both Bayesian and maximum likelihood (ML) frameworks, their formidable computational time and memory usage severely limits their use in large phylogenomic analyses. Here we propose a posterior mean site frequency (PMSF) method as a rapid and efficient approximation to full empirical profile mixture models for ML analysis. The PMSF approach assigns a conditional mean amino acid frequency profile to each site calculated based on a mixture model fitted to the data using a preliminary guide tree. These PMSF profiles can then be used for in-depth tree-searching in place of the full mixture model. Compared with widely used empirical mixture models with $k$ classes, our implementation of PMSF in IQ-TREE (http://www.iqtree.org) speeds up the computation by approximately $k$/1.5-fold and requires a small fraction of the RAM. Furthermore, this speedup allows, for the first time, full nonparametric bootstrap analyses to be conducted under complex site-heterogeneous models on large concatenated data matrices. Our simulations and empirical data analyses demonstrate that PMSF can effectively ameliorate long-branch attraction artefacts. In some empirical and simulation settings PMSF provided more accurate estimates of phylogenies than the mixture models from which they derive.

  17. Nuclear power: Siting and safety

    International Nuclear Information System (INIS)

    Openshaw, S.

    1986-01-01

    By 2030, half, or even two-thirds, of all electricity may be generated by nuclear power. Major reactor accidents are still expected to be rare occurrences, but nuclear safety is largely a matter of faith. Terrorist attacks, sabotage, and human error could cause a significant accident. Reactor siting can offer an additional, design-independent margin of safety. Remote geographical sites for new plants would minimize health risks, protect the industry from negative changes in public opinion concerning nuclear energy, and improve long-term public acceptance of nuclear power. U.K. siting practices usually do not consider the contribution to safety that could be obtained from remote sites. This book discusses the present trends of siting policies of nuclear power and their design-independent margin of safety

  18. Site scientific mission plan for the Southern Great Plains CART site: January 1997--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Institute for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States)

    1997-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  19. Closure Report for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 107 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Low Impact Soil Sites' and consists of the following 15 Corrective Action Sites (CASs), located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site: CAS 01-23-02, Atmospheric Test Site - High Alt; CAS 02-23-02, Contaminated Areas (2); CAS 02-23-03, Contaminated Berm; CAS 02-23-10, Gourd-Amber Contamination Area; CAS 02-23-11, Sappho Contamination Area; CAS 02-23-12, Scuttle Contamination Area; CAS 03-23-24, Seaweed B Contamination Area; CAS 03-23-27, Adze Contamination Area; CAS 03-23-28, Manzanas Contamination Area; CAS 03-23-29, Truchas-Chamisal Contamination Area; CAS 04-23-02, Atmospheric Test Site T4-a; CAS 05-23-06, Atmospheric Test Site; CAS 09-23-06, Mound of Contaminated Soil; CAS 10-23-04, Atmospheric Test Site M-10; and CAS 18-23-02, U-18d Crater (Sulky). Closure activities were conducted from February through April 2009 according to the FFACO (1996; as amended February 2008) and Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 107 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2009). The corrective action alternatives included No Further Action and Closure in Place with Administrative Controls. Closure activities are summarized.

  20. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed

  1. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was

  2. Preliminary Site Characterization Report, Rulsion Site, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    This report is a summary of environmental information gathered during a review of the documents pertaining to Project Rulison and interviews with personnel who worked on the project. Project Rulison was part of Operation Plowshare (a program designed to explore peaceful uses for nuclear devices). The project consisted of detonating a 43-kiloton nuclear device on September 10, 1969, in western Colorado to stimulate natural gas production. Following the detonation, a reentry well was drilled and several gas production tests were conducted. The reentry well was shut-in after the last gas production test and was held in standby condition until the general cleanup was undertaken in 1972. A final cleanup was conducted after the emplacement and testing wells were plugged in 1976. However, some surface radiologic contamination resulted from decontamination of the drilling equipment and fallout from the gas flaring during drilling operations. With the exception of the drilling effluent pond, all surface contamination at the Rulison Site was removed during the cleanup operations. All mudpits and other excavations were backfilled, and both upper and lower drilling pads were leveled and dressed. This report provides information regarding known or suspected areas of contamination, previous cleanup activities, analytical results, a review of the regulatory status, the site`s physical environment, and future recommendations for Project Ruhson. Based on this research, several potential areas of contamination have been identified. These include the drilling effluent pond and mudpits used during drilling operations. In addition, contamination could migrate in the gas horizon.

  3. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  4. Universal Access in Heritage Sites: A Case Study on Historic Sites in Jaipur, India.

    Science.gov (United States)

    Vardia, Shweta; Khare, Rachna; Khare, Ajay

    2016-01-01

    A nation is recognized by a range of its significant historical, cultural and natural properties. These properties are generally preserved and maintained either by national administration or by private owners and charitable trusts due to higher value of their cultural inheritance and termed globally as heritage or historic sites. Heritage sites are a significant asset, a unique and irreplaceable resource which reflects a rich and diverse expression of past societies and forms an integral part of local, regional and national cultural identity. Today, heritage sites also play an important role in communication and knowledge exchange. Thus the rapidly increasing heritage tourism industry faces several challenges too. One of the challenges is that there is a segment of society who is not yet able to equally enjoy the visit to historic structures/sites and attractions, facilities and services. This paper aims to study the experience and develop understanding regarding the heritage structures/sites approached and interacted by diverse users. This study is an outcome of a hands on workshop conducted with diverse users at various historic sites in the city of Jaipur viz. at The City Palace Complex, Jaipur, Jaigarh Fort and the Haveli at Kanota near to Jaipur India.

  5. High level radioactive waste siting processes: critical lessons from Canadian siting successes

    International Nuclear Information System (INIS)

    Hardy, D.R.

    1996-01-01

    While not without controversy, Canada's Crown Corporations, municipalities, agencies and private companies have had success in siting and achieving approval for operating: toxic and hazardous waste facilities; dry radioactive materials storage facilities; the Federal low-level radioactive waste disposal facility; and, several large and small domestic landfills. The cumulative experience gained from these siting and approval processes provides valuable advice in support of the siting and approval of high-level radioactive disposal facilities. Among the critical elements for the success of these siting efforts are: 1) the tinting, scope and character of the siting process reflects the cultural and social values of affected people; 2) the siting and approval processes has integrity -- characterized as rational processes in pursuit of the public interest; 3) sufficient time and resources are dedicated to listening carefully and examining issues seen to be important by the public; 4) all information is shared -- even if the information is potentially detrimental to the approval of the facility; 5) proponent has a prioritized multiple focus on 'health, safety and environment issues', on 'insuring that the environmental assessment process is socially acceptable' as well as on the 'approval considerations'; 6) the implementing agency seeks cooperation and win-win solutions with the local community; 7) the community has the option of opting-out of the process and the do-nothing and/or the not here option continues to be considered by the proponent; 8) local emergency response people are well-trained and accepting of the facility; 9) the community has a strong role in determining the terms, conditions and compensation related to the future facility. (author)

  6. Salmon Site Remedial Investigation Report

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  7. Formerly utilized MED/AEC sites remedial action program. Radiological survey of the former Watertown arsenal property, Site 34 and Site 41, Watertown, Massachusetts

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-10-01

    During the MED/AEC era, work involving radioactive materials was conducted at various sites within the arsenal complex. Building 34 housed a uranium machine shop, and a portion of Building 41 contained a foundry that was used for uranium work. Information provided by site personnel indicated that only depleted uranium was used in these buildings. Results of radiological analyses of contaminated material found at these sites indicated depleted uranium with uranium-236. Both buildings have been razed. The remnants still in place consist of the concrete floor slabs, access drives, and underground utility service trenches. This area is currently under the control of the Watertown Redevelopment Authority of Watertown, Massachusetts. During the period from June 25 through July 1, 1981, the Argonne National Laboratory (ANL), Occupational Health and Safety Division (OHS) Radiological Survey Group (RSG), conducted a radiological survey of Building Sites 34 and 41 at the direction of the US Department of Energy. Significant levels of contamination were found at 33 locations on the pad of Site 34 and in 5 out of 15 soild corings from the perimeter of the pad. No contamination was found on the pad of Site 41; however, two-thirds of this pad was covered with soil up to 4 ft thick. One of the 14 soil corings taken adjacent to the pad of Site 41 had elevated levels of uranium. Levels of contamination in excess of criteria, as identified in ANSI 13.12 and NRC Guidelines, were found at this site. The analyses of the samples from the sewer access points also revealed uranium and radium-226 anomalies. Therefore, according to NRC guidelines dated July 1982, it must be concluded that they are contaminated

  8. Conversion of agonist site to metal-ion chelator site in the beta(2)-adrenergic receptor

    DEFF Research Database (Denmark)

    Elling, C E; Thirstrup, K; Holst, Birgitte

    1999-01-01

    Previously metal-ion sites have been used as structural and functional probes in seven transmembrane receptors (7TM), but as yet all the engineered sites have been inactivating. Based on presumed agonist interaction points in transmembrane III (TM-III) and -VII of the beta(2)-adrenergic receptor,...... as generic, pharmacologic tools to switch 7TM receptors with engineered metal-ion sites on or off at will.......Previously metal-ion sites have been used as structural and functional probes in seven transmembrane receptors (7TM), but as yet all the engineered sites have been inactivating. Based on presumed agonist interaction points in transmembrane III (TM-III) and -VII of the beta(2)-adrenergic receptor......, in this paper we construct an activating metal-ion site between the amine-binding Asp-113 in TM-III-or a His residue introduced at this position-and a Cys residue substituted for Asn-312 in TM-VII. No increase in constitutive activity was observed in the mutant receptors. Signal transduction was activated...

  9. SSC [Superconducting Super Collider] site evaluations

    International Nuclear Information System (INIS)

    1988-11-01

    With this report, the SSC Site Task Force forwards to the Director, Office of Energy Research, US Department of Energy (DOE), its evaluation of the technical criteria and life-cycle costs for the proposed SSC sites judged to be the best qualified. The criteria against which each site was evaluated are those set forth in the Invitation for Site Proposals for the Superconducting Super Collider (DOE/ER-0315) (Invitation) which was prepared by the Task Force and issued in April 1987. The methodology followed by the Task Force in this report and in all other phases of the proposal evaluation has been consistent with the SSC site selection process approved by DOE's Energy System Acquisition Advisory Board (ESAAB). The goal of the site selection process is to identify a site that will permit the highest level of research productivity and overall effectiveness of the SSC at a reasonable cost of construction and operation and with minimial impact on the environment. The Task Force acknowledges that all seven sites are, indeed, highly qualified locations for the construction and operation of the SSC on the basis of technical and cost considerations. In performing its evaluation, which is presented in this paper, the Task Force took an in-depth look at each site on the basis of site visits and extensive technical analyses. A consensus rating for each technical evaluation criterion and subcriterion was developed for each site

  10. LIBRA: LIgand Binding site Recognition Application.

    Science.gov (United States)

    Hung, Le Viet; Caprari, Silvia; Bizai, Massimiliano; Toti, Daniele; Polticelli, Fabio

    2015-12-15

    In recent years, structural genomics and ab initio molecular modeling activities are leading to the availability of a large number of structural models of proteins whose biochemical function is not known. The aim of this study was the development of a novel software tool that, given a protein's structural model, predicts the presence and identity of active sites and/or ligand binding sites. The algorithm implemented by ligand binding site recognition application (LIBRA) is based on a graph theory approach to find the largest subset of similar residues between an input protein and a collection of known functional sites. The algorithm makes use of two predefined databases for active sites and ligand binding sites, respectively, derived from the Catalytic Site Atlas and the Protein Data Bank. Tests indicate that LIBRA is able to identify the correct binding/active site in 90% of the cases analyzed, 90% of which feature the identified site as ranking first. As far as ligand binding site recognition is concerned, LIBRA outperforms other structure-based ligand binding sites detection tools with which it has been compared. The application, developed in Java SE 7 with a Swing GUI embedding a JMol applet, can be run on any OS equipped with a suitable Java Virtual Machine (JVM), and is available at the following URL: http://www.computationalbiology.it/software/LIBRAv1.zip. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  11. Remaining Sites Verification Package for the 100-D-2 Lead Sheeting Waste Site. Attachment to Waste Site Reclassification Form 2007-030

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2008-01-01

    The 100-D-2 Lead Sheeting waste site was located approximately 50 m southwest of the 185-D Building and approximately 16 m north of the east/west oriented road. The site consisted of a lead sheet covering a concrete pad. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  12. Site environmental report for 1996

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-08-01

    To help verify effective protection of public safety and preservation of the environment, Sandia National Laboratories (SNL)/California maintains an extensive, ongoing environmental monitoring program. This program monitors all significant airborne and liquid effluents and the environment at the SNL/California site perimeter. Lawrence Livermore National Laboratory (LLNL) performs off-site environmental monitoring for both sites. These monitoring efforts ensure that emission controls are effective in preventing contamination of the environment. As part of SNL/California's Environmental Monitoring Program, an environmental surveillance system measures the possible presence of radioactive and hazardous materials in ambient air, surface water, groundwater, sewage, soil, vegetation, and locally produced food-stuffs. The program also includes an extensive environmental dosimetry program, which measures external radiation levels around the Livermore site and nearby vicinity. Each year, the results of the Environmental Monitoring Program are published in this report, the Site Environmental Report. This executive summary focuses on impacts to the environment and estimated radiation doses to the public from site emissions. Chapter 3, open-quotes Compliance Summary,close quotes reviews the site's various environmental protection activities and compliance status, with applicable environmental regulations. The effluent monitoring and environmental surveillance results for 1996 show that SNL/California operations had no harmful effects on the environment or the public. 37 figs., 12 tabs

  13. Technical advisory on SSC site criteria and catalog of site information needs

    Energy Technology Data Exchange (ETDEWEB)

    1985-06-15

    The Superconducting Super Collider, or SSC, is a proposed scientific instrument of the study of the fundamental nature of matter. In the SSC two 20-TeV beams of protons will be accelerated and counter circulate on an approximately circular path. The protons will be made to collide at six locations where detectors can be placed to count and measure the products of the collisions. These collisions, twenty times more energetic than in any existing facility, will enable scientists to probe deeper into the heart of matter in the quest for a deeper understanding of the universal forces of nature. The goal of the SSC project is to create a scientific laboratory in high energy physics whose facilities are unique. Ultimately the success of that laboratory will be measured by its scientific discoveries, measurements, interpretations, and innovations. Toward that end the accelerator-collider must be constructed to high standards at minimum cost and maximum effectiveness. Preparations must be made for future operations and a scientific-technical staff attracted and maintained. The chosen site must accommodate all of these factors. This document summarizes siting criteria for the SSC and enumerates site-specific information important to the evaluation of potential sites. This document is not a call for site proposals but a technical report prepared for the information and use of the Department of Energy (DOE).

  14. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.; Telleschi, P.

    1978-10-01

    Two of the main underground siting alternatives, the rock cavity plant and the pit siting, have been investigated in detail and two layouts, developed for specific sites, have been proposed. The influence of this type of siting on normal operating conditions and during abnormal occurences have been investigated. (Auth.)

  15. 10 CFR 72.96 - Siting limitations.

    Science.gov (United States)

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... site within which there is a candidate site for a HLW repository. This limitation shall apply until such time as DOE decides that such candidate site is no longer a candidate site under consideration for...

  16. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  17. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab

  18. Global positioning site environment evaluator

    International Nuclear Information System (INIS)

    Leffler, S.; Reeser, H.G.; Zaker, E.; Hansen, W.; Sikorski, R.W.

    1990-01-01

    Development of an innovative, integrated, automated system (Global Positioning Site Environment Evaluator - GPSEETM) for surveying contaminated waste sites is described. This system makes novel use of the Global Positioning System (GPS) satellite constellation for establishing specific locations and current times for surveying radioactive, hazardous, or mixed-waste sites. GPSEE may also be used for waste site contamination surveys after remediation activities to ensure environmental remediation is complete. A base station is established for collecting and recording data and directing field operations for field stations which may be located many miles from the base station. The field operators collect site surveying and contamination data utilizing a variety of chemical and radiological sensors. A major goal for the data collection process is to collect all data utilizing in situ sensors, thereby minimizing the need for collecting soil and water samples. Site contamination data is transmitted electronically to the base station for recording and processing. The GPSEE system is being developed for use at DOE/DOD and a variety of industrial facilities. 3 figs

  19. Japanese site for ITER: Rokkasho

    International Nuclear Information System (INIS)

    Kishimoto, Hiroshi

    2003-01-01

    This paper describes the status of Japanese efforts for hosting ITER in Japan. In May 2002, Japanese Government decided to propose an ITER site, Rokkasho in Aomori Prefecture, a Northern part of the main island, based on the comprehensive/intensive assessments by the Site Selection Committee established by Japanese Government. ITER is designed basically with a potential flexibility beyond the detailed technical objectives to have more clear scope for developing technical key elements in a future power plant. Various flexibilities in the construction, operation and decommissioning of ITER are totally assessed. Consequently the Japanese site has been chosen and it satisfies sufficiently not only the Site Requirements and the Site Design Assumptions but also the further extension and flexibilities. In particular the potential for more flexible construction schedule and operations is technically described as well as the fulfillment of the site requirements and its assumptions as the minimum requirements in this paper. The socio-cultural environment is also described briefly because of a key aspect for the scientists and engineers who will participate in the project

  20. 1992 Fernald Site Environmental Report

    International Nuclear Information System (INIS)

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992

  1. Site-Specific Waste Management Instruction - 100-DR-1 Group 2 Sites

    International Nuclear Information System (INIS)

    Jackson, R.W.

    1998-01-01

    This site-specific waste management instruction (SSWMI) provides guidance for the management of wastes that may be generated during the excavation and remediation of the 100-DR-1 Group 2 sites. The management of waste generated as a result of these activities will be as directed in this SSWMI. This SSWMI will be revised to incorporate guidance for management of wastes encountered that are not addressed in this SSWMI

  2. Environmental assessment, Richton Dome site, Mississippi (US)

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC Sections 10101-10226) requires the environmental assessment of a potential site to include a statement of the basis for the nomination of a site as suitable for characterization. Volume 2 of this environmental assessment provides a detailed evaluation of the Richton Dome Site and its suitability as the site for a radioactive waste disposal facility under DOE siting guidelines, as well as a comparison of the Richton Dome site with other proposed sites. Evaluation of the Richton Dome site is based on the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The comparative evaluation of proposed sites is required under DOE guidelines, but is not intended to directly support the subsequent recommendation of three sites for characterization as candidate sites. 428 refs., 24 figs., 62 tabs. (MHB)

  3. Early Site Permit Demonstration Program, plant parameters envelopes: Comparison with ranges of values for four hypothetical sites

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this volume is to report the results of the comparison of the ALWR plan parameters envelope with values of site characteristics developed for our hypothetical sites that generally represent conditions encountered within the United States. This effort is not intended to identify or address the suitability of any existing site, site area, or region in the United States. Also included in this volume is Appendix F, SERCH Summaries Regarding Siting

  4. Application for Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-08-05

    The NTS is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. NNSA/NSO is the federal lands management authority for the NTS and NSTec is the Management & Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The U10C Disposal Site is located in the northwest corner of Area 9 at the NTS (Figure 1) and is located in a subsidence crater created by two underground nuclear events, one in October 1962 and another in April 1964. The disposal site opened in 1971 for the disposal of rubbish, refuse, pathological waste, asbestos-containing material, and industrial solid waste. A Notice of Intent form to operate the disposal site as a Class II site was submitted to the state of Nevada on January 26, 1994, and was acknowledged in a letter to the DOE on February 8, 1994. It operated as a state of Nevada Class II Solid Waste Disposal Site (SWDS) until it closed on October 5, 1995, for retrofit as a Class III SWDS. The retrofit consisted of the installation of a minimum four-foot compacted soil layer to segregate the different waste types and function as a liner to inhibit leachate and water flow into the lower waste zone. Five neutron monitoring tubes were installed in this layer to monitor possible leachate production and water activity. Upon acceptance of the installed barrier and approval of an Operating Plan by NDEP/BFF, the site reopened in January 1996 as a Class III SWDS for the disposal of industrial solid waste and other inert waste.

  5. Forsmark site investigation. Programme for long-term observations of geosphere and biosphere after completed site investigations

    International Nuclear Information System (INIS)

    2007-06-01

    The site investigation at Forsmark was terminated the last of June, 2007. Hundreds of investigations have been conducted during a period of more than five years. Monitoring of a number of geoscientific parameters and biological objects has been one important part of the site investigation programme. Monitoring is defined as recurrent measurements of the same parameters/objects, so that time series are generated. Long-term monitoring of for example weather parameters, surface water discharge in brooks, and the groundwater head in a large number of boreholes has been conducted during the site investigations. Furthermore, repeated sampling of precipitation, surface water and groundwater in soil and rock for hydrochemical analyses has been carried out, and the groundwater flow in isolated borehole sections has been measured several times. Besides, some biological objects, for example rare bird species, have been invented each year of the site investigation. The measured parameters and the invented objects are characterized by a certain degree of time dependent variability, which is also site-specific. The aim of the monitoring is primarily to establish the 'undisturbed' conditions, the so called 'baseline'. If a deep repository is sited at Forsmark, many site-specific conditions will change, due to natural causes as well as to the construction works. Knowledge about the undisturbed conditions strengthens the ability to reveal and quantify such changes and to distinguish natural changes from those caused by the human activities. Another object of monitoring is to, by the study of the variability pattern of the monitored parameters, elevate the knowledge about the underlying, often complex causes governing the variations. In this way the description of site-specific conditions may be more precise and the prospects of modelling important processes are improved. After completion of the site investigations, a period of about two years will follow, when the investigation

  6. Forsmark site investigation. Programme for long-term observations of geosphere and biosphere after completed site investigations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-06-15

    The site investigation at Forsmark was terminated the last of June, 2007. Hundreds of investigations have been conducted during a period of more than five years. Monitoring of a number of geoscientific parameters and biological objects has been one important part of the site investigation programme. Monitoring is defined as recurrent measurements of the same parameters/objects, so that time series are generated. Long-term monitoring of for example weather parameters, surface water discharge in brooks, and the groundwater head in a large number of boreholes has been conducted during the site investigations. Furthermore, repeated sampling of precipitation, surface water and groundwater in soil and rock for hydrochemical analyses has been carried out, and the groundwater flow in isolated borehole sections has been measured several times. Besides, some biological objects, for example rare bird species, have been invented each year of the site investigation. The measured parameters and the invented objects are characterized by a certain degree of time dependent variability, which is also site-specific. The aim of the monitoring is primarily to establish the 'undisturbed' conditions, the so called 'baseline'. If a deep repository is sited at Forsmark, many site-specific conditions will change, due to natural causes as well as to the construction works. Knowledge about the undisturbed conditions strengthens the ability to reveal and quantify such changes and to distinguish natural changes from those caused by the human activities. Another object of monitoring is to, by the study of the variability pattern of the monitored parameters, elevate the knowledge about the underlying, often complex causes governing the variations. In this way the description of site-specific conditions may be more precise and the prospects of modelling important processes are improved. After completion of the site investigations, a period of about two years will follow, when

  7. State of Nevada comments on the US Department of Energy site characterization plan, Yucca Mountain site, Nevada

    International Nuclear Information System (INIS)

    1989-09-01

    In December 1988, the US Department of Energy issued a Site Characterization Plan (SCP) for the Yucca Mountain site, as required by Section 113 of the Nuclear Waste Policy Act of 1982 (NWPA). The purpose of site characterization is to develop sufficient information to support a determination of the suitability, or lack of suitability of the site to safely isolate high-level radioactive waste with reasonable certainty for thousands of years. The purpose of the Site Characterization Plan is to describe plans for obtaining sufficient information about the site, plans for mitigation of any adverse impacts occurring from site characterization activities, and plans for decontamination and decommissioning of the site if it is determined not to be suitable for a repository. Part I presents an overview of the State's comments. The overview takes the form of general concerns and comments organized by specific areas of concern. The overview does not follow the format of the SCP

  8. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    The Slick Rock uranium mill tailings sites are located near the small town of Slick Rock, in San Miguel County, Colorado. There are two designated UMTRA sites at Slick Rock, the Union Carbide (UC) site and the North Continent (NC) site. Both sites are adjacent to the Dolores River. The UC site is approximately 1 mile (mi) [2 kilometers (km)] downstream of the NC site. Contaminated materials cover an estimated 55 acres (ac) [22 hectares (ha)] at the UC site and 12 ac (4.9 ha) at the NC site. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 620, 000 cubic yards (yd 3 ) [470,000 cubic meters (m 3 )]. In addition to the contamination at the two processing site areas, four vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into groundwater

  9. SITE-94. Chemical and physical transport parameters for SITE-94

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Karin [Chalmers Univ. of Technology, Goeteborg (Sweden). Technical Environmental Planning

    1996-02-01

    Important parameters are the interactions of radionuclides with solid surfaces, parameters describing the geometrical conditions like porosity, data on water composition (ionic strength, pH, redox conditions, complex formers etc) and data on the solids that may be of importance to the water and radionuclide chemistry. In this report some of these data of relevance for the Aespoe site are discussed. Based on a literature survey, sorption data as well as values for some other parameters have been selected for rock, fracture fillings and bentonite relevant to the chemical conditions in and around a repository at Aespoe. A comparison to data used for earlier, site-specific as well as general, safety assessments of underground repositories has been performed. The data are recommendations for modelling of radionuclide release from a hypothetical high level waste repository at Aespoe. Since the data to a large extent are not based on experimental measurements, more accurate predictions may be expected if more experimental data are available. Before such studies are performed for a specific site, a variational analysis in order to evaluate the importance of the single parameters is recommended. After such a study, the key parameters may be investigated in detail and the modelling can be expected to be more accurate what concerns influence of single parameters. However, the uncertainty in conceptual areas like how to model accurately the long term hydrology of the site etc still remains. 32 refs.

  10. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    International Nuclear Information System (INIS)

    2013-01-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  11. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  12. Requirements of on-site facilities

    International Nuclear Information System (INIS)

    Burchardt, H.

    1977-01-01

    1) Requirements of on-site facilities: a) brief description of supplying the site with electricity and water; communication facilities, b) necessary facilities for containment and pipeline installation, c) necessary facilities for storage, safety, accommodation of personnel, housing; workshops; 2) Site management: a) Organisation schedules for 'turn-key-jobs' and 'single commission', b) Duties of the supervisory staff. (orig.) [de

  13. Metropolitan siting: a historical perspective

    International Nuclear Information System (INIS)

    Bunch, D.F.

    1978-09-01

    The paper discusses the development and implementation of the Reactor Site Criteria and particularly the evolving posture of the agency on the subject of metropolitan siting. The review actions on nine sites are described to illustrate the various issues and positions and to clarify at least some of the bases for current practices of the NRC staff

  14. YUCCA MOUNTAIN SITE DESCRIPTION

    International Nuclear Information System (INIS)

    Simmons, A.M.

    2004-01-01

    The ''Yucca Mountain Site Description'' summarizes, in a single document, the current state of knowledge and understanding of the natural system at Yucca Mountain. It describes the geology; geochemistry; past, present, and projected future climate; regional hydrologic system; and flow and transport within the unsaturated and saturated zones at the site. In addition, it discusses factors affecting radionuclide transport, the effect of thermal loading on the natural system, and tectonic hazards. The ''Yucca Mountain Site Description'' is broad in nature. It summarizes investigations carried out as part of the Yucca Mountain Project since 1988, but it also includes work done at the site in earlier years, as well as studies performed by others. The document has been prepared under the Office of Civilian Radioactive Waste Management quality assurance program for the Yucca Mountain Project. Yucca Mountain is located in Nye County in southern Nevada. The site lies in the north-central part of the Basin and Range physiographic province, within the northernmost subprovince commonly referred to as the Great Basin. The basin and range physiography reflects the extensional tectonic regime that has affected the region during the middle and late Cenozoic Era. Yucca Mountain was initially selected for characterization, in part, because of its thick unsaturated zone, its arid to semiarid climate, and the existence of a rock type that would support excavation of stable openings. In 1987, the United States Congress directed that Yucca Mountain be the only site characterized to evaluate its suitability for development of a geologic repository for high-level radioactive waste and spent nuclear fuel

  15. SITE COMPREHENSIVE LISTING (CERCLIS) - Contaminants at CERCLIS (Superfund) Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Contaminants at Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Sites - The CERCLIS Public Access Database...

  16. SITE-94. Discrete-feature modelling of the Aespoe site: 2. Development of the integrated site-scale model

    International Nuclear Information System (INIS)

    Geier, J.E.

    1996-12-01

    A 3-dimensional, discrete-feature hydrological model is developed. The model integrates structural and hydrologic data for the Aespoe site, on scales ranging from semi regional fracture zones to individual fractures in the vicinity of the nuclear waste canisters. Hydrologic properties of the large-scale structures are initially estimated from cross-hole hydrologic test data, and automatically calibrated by numerical simulation of network flow, and comparison with undisturbed heads and observed drawdown in selected cross-hole tests. The calibrated model is combined with a separately derived fracture network model, to yield the integrated model. This model is partly validated by simulation of transient responses to a long-term pumping test and a convergent tracer test, based on the LPT2 experiment at Aespoe. The integrated model predicts that discharge from the SITE-94 repository is predominantly via fracture zones along the eastern shore of Aespoe. Similar discharge loci are produced by numerous model variants that explore uncertainty with regard to effective semi regional boundary conditions, hydrologic properties of the site-scale structures, and alternative structural/hydrological interpretations. 32 refs

  17. SITE-94. Discrete-feature modelling of the Aespoe site: 2. Development of the integrated site-scale model

    Energy Technology Data Exchange (ETDEWEB)

    Geier, J.E. [Golder Associates AB, Uppsala (Sweden)

    1996-12-01

    A 3-dimensional, discrete-feature hydrological model is developed. The model integrates structural and hydrologic data for the Aespoe site, on scales ranging from semi regional fracture zones to individual fractures in the vicinity of the nuclear waste canisters. Hydrologic properties of the large-scale structures are initially estimated from cross-hole hydrologic test data, and automatically calibrated by numerical simulation of network flow, and comparison with undisturbed heads and observed drawdown in selected cross-hole tests. The calibrated model is combined with a separately derived fracture network model, to yield the integrated model. This model is partly validated by simulation of transient responses to a long-term pumping test and a convergent tracer test, based on the LPT2 experiment at Aespoe. The integrated model predicts that discharge from the SITE-94 repository is predominantly via fracture zones along the eastern shore of Aespoe. Similar discharge loci are produced by numerous model variants that explore uncertainty with regard to effective semi regional boundary conditions, hydrologic properties of the site-scale structures, and alternative structural/hydrological interpretations. 32 refs.

  18. Radiological audit of remedial action activities at the processing site, transfer site, and Cheney disposal site Grand Junction, Colorado: Audit date, August 9--11, 1993

    International Nuclear Information System (INIS)

    1993-08-01

    The Uranium Mill Tailing Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological audit of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site, transfer site, and Cheney disposal site in Grand Junction, Colorado. Jim Hylko and Bill James of the TAC conducted this audit August 9 through 11, 1993. Bob Cornish and Frank Bosiljevec represented the US Department of Energy (DOE). This report presents one programmatic finding, eleven site-specific observations, one good practice, and four programmatic observations

  19. Criminal Justice Web Sites.

    Science.gov (United States)

    Dodge, Timothy

    1998-01-01

    Evaluates 15 criminal justice Web sites that have been selected according to the following criteria: authority, currency, purpose, objectivity, and potential usefulness to researchers. The sites provide narrative and statistical information concerning crime, law enforcement, the judicial system, and corrections. Searching techniques are also…

  20. Environmental assessment, Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)