WorldWideScience

Sample records for making contracting work

  1. Making contract farming work? : society and technology in Philippine transnational agribusiness

    OpenAIRE

    Vellema, S.

    2002-01-01

    Keywords: contract farming, agribusiness, Philippines, Southeast Asia, asparagus, hybrid maize

    Contract farming is a widespread and important tool for organising agricultural production in line with corporate strategies and market demands. This book analyses how Philippine farmers and transnational agribusiness make contract farming work in two production schemes in Mindanao: the export-oriented production of high-value asparagus and the risky production of hybrid maize see...

  2. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  3. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  4. Extended warranties, maintenance service and lease contracts modeling and analysis for decision-making

    CERN Document Server

    Murthy, D N Prabhakar

    2014-01-01

    Serving to unify the existing literature on extended warranties, maintenance service contracts and lease contracts, this book also presents a unique perspective on the topic focussed on cost analysis and decision-making from the perspectives of the parties involved. Using a game theoretic approach together with mathematical modelling, results are presented in an integrated manner with key topics that require further research highlighted in order to serve as a starting point for researchers (engineers and statisticians) who are interested in doing further work in these areas. Designed to assist practitioners (managers, engineers, applied statisticians) who are involved with extended warranties, maintenance service contracts and lease contracts, the book provides them with the models and techniques needed for proper cost analysis and effective decision-making. The book is also suitable for use as a reference text in industrial engineering, applied statistics, operations research and management.

  5. Making contract farming work? : society and technology in Philippine transnational agribusiness

    NARCIS (Netherlands)

    Vellema, S.

    2002-01-01

    Keywords: contract farming, agribusiness, Philippines, Southeast Asia, asparagus, hybrid maize

    Contract farming is a widespread and important tool for organising agricultural production in line with corporate strategies and market demands. This book analyses how Philippine farmers

  6. Quantification of contraction synchronicity and contraction work in coronary artery disease

    Energy Technology Data Exchange (ETDEWEB)

    Niimi, Takanaga; Nanasato, Mamoru [Nagoya Daini Red Cross Hospital, Nagoya (Japan); Maeda, Hisatoshi [Dept. of Radiological Technology, Nagoya University School of Health Sciences, Nagoya(Japan)

    2017-09-15

    This study quantified the contraction synchronicity (CS; with 100% representing full synchrony and −100% dyssynchrony) and contraction work (CW, millijoules per centimeter squared; representing myocardial area) in patients with reduced left ventricular ejection fraction (LVEF) associated with coronary artery disease (CAD)

  7. Contracting: The modern way to work. A professional's perspective

    International Nuclear Information System (INIS)

    Banks, C.D.; Pavan, E.A.

    1991-01-01

    The relationship between employers and employees in the oil and gas industry has undergone some fundamental changes, including increasing use of contract professionals, work sharing, more work done at home, individuals partnering or in association with groups of professionals, and transfer of properties to subsidiaries or contract management organizations. The use of contract professionals and technical personnel within an existing corporate structure is examined. Reasons for individuals to choose contracting include career choice, early- or semi-retired status, between jobs, and family/personal reasons. Contracting provides a more open relationship between the professional and the contractor, allows professionals to pursue a career of choice, and gives time flexibility. By contracting through a linking company, a professional can earn about the same annual income as through regular employment if 220 days of work a year can obtained. 1 tab

  8. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  9. A Liquid work-life under public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Christian

    for staff, however, are only poorly understood in current theory and research on public service contracting through partial concepts and a tendency to focus merely on negative outcomes. Against this shortfall, the aim in this paper is to build a conceptually and empirically richer and more authentic account......A part of the reality behind public service contracting in Denmark as well as in many other countries is that a growing number of people are employed in uncertain and temporary conditions and relations in what can be characterized as ‘liquidized’ work-lives. This reality and its consequences...... of staffs’ work-life under public service contracting. The paper relies empirically on focus group interviews in two cases of staff transfers in public service contracting with different levels of liquefaction. it is found that staff transfer is a composite experience for staff with differential outcomes...

  10. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  11. Government Health Care Contract Incentives: Making Managed Health Care Work in Federal Government Procurements

    National Research Council Canada - National Science Library

    Teskey, Mark S

    1999-01-01

    Contracting for managed health care systems is a complex undertaking. The current TRICARE contracts captured all the important parts of the system and ensured detailed compliance with the many system requirements...

  12. 48 CFR 36.609-3 - Work oversight in architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 36.609-3 Section 36.609-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.609-3 Work oversight in architect-engineer contracts. The contracting officer...

  13. 48 CFR 52.236-24 - Work Oversight in Architect-Engineer Contracts.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contracts. 52.236-24 Section 52.236-24 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-24 Work Oversight in Architect-Engineer Contracts. As prescribed in 36.609-3, insert the following clause: Work Oversight in Architect-Engineer Contracts (APR 1984) The extent and...

  14. 45 CFR 2543.84 - Contract Work Hours and Safety Standards Act.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Contract Work Hours and Safety Standards Act. 2543... OTHER NON-PROFIT ORGANIZATIONS Statutory Compliance § 2543.84 Contract Work Hours and Safety Standards Act. Where applicable, all contracts awarded by recipients in excess of $2000 for construction...

  15. 46 CFR Sec. 4 - Persons authorized to make awards under the NSA-WORKSMALREP Contract.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Persons authorized to make awards under the NSA-WORKSMALREP Contract. Sec. 4 Section 4 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION A... INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Sec. 4 Persons authorized to make awards under the NSA...

  16. Left Unsaid: The Role of Work Expectations and Psychological Contracts in Faculty Careers and Departure

    Science.gov (United States)

    O'Meara, KerryAnn; Bennett, Jessica Chalk; Neihaus, Elizabeth

    2016-01-01

    Early career faculty bring many expectations to the door-steps of their new academic homes. Yet such expectations are often left unsaid. Unfortunately, what is left unsaid can be a major factor in faculty departure. This study makes a distinct contribution to the departure literature by examining the psychological contracts and work expectations…

  17. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth; Smulders, Peter; Taris, Toon W

    2012-10-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract, temporary contract with prospect of permanent work, fixed-term contract, temporary agency contract and on-call contract) in the quality of working life, job insecurity, health and work-related attitudes and (2) investigate whether these latter contract group differences in health and work-related attitudes can be explained by differences in the quality of working life and/or job insecurity. Data were collected from the Netherlands Working Conditions Survey 2008 (N = 21,639), and Hypotheses were tested using analysis of variance and cross-table analysis. Temporary work was associated with fewer task demands and lower autonomy and was more often passive or high-strain work, while permanent work was more often active work. Except for on-call work, temporary work was more insecure and associated with worse health and work-related attitude scores than permanent work. Finally, the quality of working life and job insecurity partly accounted for most contract differences in work-related attitudes but not in health. Especially agency workers have a lower health status and worse work-related attitudes. Job redesign measures regarding their quality of working life and job insecurity are recommended.

  18. 48 CFR 936.609-3 - Work oversight in architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 936.609-3 Section 936.609-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 936.609-3 Work oversight in architect-engineer contracts. In addition to the clause at 48...

  19. The implicit contract: implications for health social work.

    Science.gov (United States)

    McCoyd, Judith L M

    2010-05-01

    Identifying common patient dynamics is useful for developing social work practice sensitivity in health social work. This article draws on findings from a study of women who terminated desired pregnancies because of fetal anomalies and identifies dynamics that may be applicable to many health settings. Data suggest that women have expectations that submission to medical care, particularly high-tech medical care, should ensure a positive outcome--in this case a healthy baby. Analysis of data reveals the presence of an implicit contract that the women hold with the medical system,"Mother Nature," or society. The analysis carries an implication that health social work should help patients develop realistic expectations about health care. The presence of implicit contracts may have further implications for liability and litigation. Social work roles and interventions are addressed.

  20. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  1. Psychological Contracts: Are They Still Relevant?

    Science.gov (United States)

    Maguire, Heather

    2002-01-01

    Empirical evidence from a banking organization illustrated how change has an impact on psychological contracts. Concluded that maintenance of contracts makes an important contribution to relationships but organizations need to adjust psychological contracts to meet the needs of the work force. (Contains 58 references.) (JOW)

  2. Study of the influence on emotional work contract nurses on Job Burnout

    Directory of Open Access Journals (Sweden)

    Song Changping

    2017-01-01

    Full Text Available Discuss the influences of contract nurse’ emotion work on job burnout and provide theoretical basis for reducing the job burnout of perception level which caused by emotion work of contract nurse. Methods: The data which comes from the questionnaire survey about the Chinese edition of Maslach job burnout scale for 298 contract nurse is used statistical analysis by SPSS11.5 software. Results: The current contract nurse is more inclined to “surface acting” on working and the nurses have a lower level “depersonalization” (P < 0.05, the difference is statistically significant and the more “deep acting” are used the lower level of job burnout. There is a various factors’ correlation between contract nurse’s emotion work and job burnout. : Conclusions: The “surface acting” could increase job burnout, “deep acting” and emotion expression requirements could increase personal job satisfaction.

  3. The relationships between perceived organizational support, affective commitment, psychological contract breach, organizational citizenship behaviour and work engagement.

    Science.gov (United States)

    Gupta, Vishal; Agarwal, Upasna A; Khatri, Naresh

    2016-11-01

    This study examines the factors that mediate and moderate the relationships of perceived organizational support with work engagement and organization citizenship behaviour. Specifically, affective commitment is posited to mediate and psychological contract breach to moderate the above relationships. Nurses play a critical role in delivering exemplary health care. For nurses to perform at their best, they need to experience high engagement, which can be achieved by providing them necessary organizational support and proper working environment. Data were collected via a self-reported survey instrument. A questionnaire was administered to a random sample of 750 nurses in nine large hospitals in India during 2013-2014. Four hundred and seventy-five nurses (63%) responded to the survey. Hierarchical multiple regression was used for statistical analysis of the moderated-mediation model. Affective commitment was found to mediate the positive relationships between perceived organizational support and work outcomes (work engagement, organizational citizenship behaviour). The perception of unfulfilled expectations (psychological contract breach) was found to moderate the perceived organizational support-work outcome relationships adversely. The results of this study indicate that perceived organizational support exerts its influence on work-related outcomes and highlight the importance of taking organizational context, such as perceptions of psychological contract breach, into consideration when making sense of the influence of perceived organizational support on affective commitment, work engagement and citizenship behaviours of nurses. © 2016 John Wiley & Sons Ltd.

  4. Women's Learning in Contract Work: Practicing Contradictions in Boundaryless Conditions

    Science.gov (United States)

    Fenwick, Tara

    2008-01-01

    The general rise in contractors, particularly among knowledge workers negotiating "boundaryless" employment conditions, has generated interest in the nature and forms of contract work. This article explores the learning of contract workers as they negotiate these conditions, with a focus on women. Drawing from a qualitative study of…

  5. The changing psychological contract at work and employee burnout.

    Science.gov (United States)

    Malach Pines, Ayala

    2002-01-01

    Today we stand in a vortex of technological, economic, and cultural changes that altered dramatically the world of labor and with it the psychological contract between employers and employees. While the effects of the changed contract at work are usually addressed from an organizational, social or economic perspective, the current article addresses it from a psychological perspective from which one noteworthy cost of the changed psychological contract is employee burnout. The article describes burnout, differentiates it from stress, and proposes an existential perspective to explain its underlying dynamic, using the results of a cross-cultural study of Israeli and American managers as an example. Recent studies on gender differences in management are used to point in the recommended for preventing employee burnout, despite the new psychological contract, namely--a democratic, egalitarian management style.

  6. Work engagement, psychological contract breach and job satisfaction

    OpenAIRE

    Rayton, Bruce A.; Yalabik, Zeynep Y.

    2014-01-01

    This study extends both Social Exchange Theory and the Job Demands-Resources model by examining the link between psychological contract breach (PCB) and work engagement, and by integrating job satisfaction into this exchange relationship. We argue that PCB reflects employees' feelings of resource loss, and that these feelings impact work engagement through their impact on job satisfaction. Levels of employee work engagement can therefore be viewed as reciprocation for the exchange content pro...

  7. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes.

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth N J; Taris, Toon W

    2012-01-01

    Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable trajectories, whereas upward trajectories were expected to be for the better and downward trajectories to be for the worse (Hypothesis 1). As turnover theories suggest that this hypothesis may only apply to workers who do not change employer, we also examined these contract trajectories stratified for a change of employer (Hypothesis 2). Drawing on the 2007 and 2008 waves of the Netherlands Working Conditions Cohort Study (N=9,688), repeated measures analysis of covariance showed little across-time change in the criterion variables, thus largely disconfirming our first hypothesis. These results could (at least partly) be explained by employer change; this was generally associated with improved scores among all contract trajectories (Hypothesis 2). However, workers receiving a less stable contract from the same employer were found to be at risk for health and well-being problems. Segmentation theory-based assumptions on contract trajectories primarily apply to stable and downward contract trajectories at the same employer, whereas assumptions from turnover theories better apply to contract trajectories combined with a change of employer. Future research should focus more closely on factors predicting "involuntary" downward trajectories into precarious temporary employment or unemployment.

  8. 48 CFR 42.705-1 - Contracting officer determination procedure.

    Science.gov (United States)

    2010-10-01

    ... a multidivisional corporation under the cognizance of a corporate administrative contracting officer... organization. (2) Business units not under the cognizance of a corporate administrative contracting officer... accounting system capabilities. The contractor, contracting officer, and auditor must work together to make...

  9. Job Insecurity and Innovative Work Behaviour: A Psychological Contract Perspective

    Directory of Open Access Journals (Sweden)

    Wendy Niesen

    2018-01-01

    Full Text Available Innovation is considered to be of crucial importance for organisational survival and growth, and in this respect employees play a leading role, as they are the ones who develop innovative ideas. At the same time, the struggle for organisational survival and growth gives rise to perceptions of job insecurity. To date, few studies have explored how employees’ innovative work behaviour (IWB is influenced by the perceived threat of job loss (i.e. job insecurity. As both job insecurity and IWB are increasingly salient in light of organisational change and competition, the present study examines the relationship between job insecurity and IWB, as well as the role of psychological contract breach in explaining this relationship. We hypothesized a negative relation between job insecurity and innovative work behaviour, with psychological contract breach as a mediator in this relationship. Participants were 190 employees from an industrial organisation that had faced restructuring and downsizing for several years. Contrary to our predictions, no direct association was found between job insecurity and the two sub-dimensions of innovative work behaviour (i.e., idea generation and idea implementation. Indirect relationships, however, were found between job insecurity and the two types of IWB through psychological contract breach. Surprisingly, psychological contract breach was positively related to idea generation and idea implementation. These findings shed new light on the relationship between job insecurity and IWB.

  10. 48 CFR 215.404-71-3 - Contract type risk and working capital adjustment.

    Science.gov (United States)

    2010-10-01

    .... Cost-plus-incentive-free (4) 1.0 0 to 2. Cost-plus-fixed-fee (4) 0.5 0 to 1. Time-and-materials... considered cost-plus-fixed-fee contracts for the purposes of assigning profit values. They shall not receive... CONTRACTING BY NEGOTIATION Contract Pricing 215.404-71-3 Contract type risk and working capital adjustment. (a...

  11. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  12. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J. van den; Smulders, P.G.W.; Taris, T.W.

    2012-01-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract,

  13. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  14. Return-to-work of sick-listed workers without an employment contract--what works?

    Science.gov (United States)

    Vermeulen, Sylvia J; Tamminga, Sietske J; Schellart, Antonius Jm; Ybema, Jan Fekke; Anema, Johannes R

    2009-07-14

    In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC) interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW) of these workers. A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4-6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract), level of education, reason for absenteeism (diagnosis), and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. At 7-9 months after the first day of reporting sick only 19% of the workers had (partially or completely) returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49%) intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC professional made and discussed a RTW action plan'. The

  15. Dynamics of psychological contracts with work engagement and turnover intention: the influence of organizational tenure

    NARCIS (Netherlands)

    Bal, P.M.; de Cooman, R.; Mol, S.T.

    2013-01-01

    This study investigated the interrelations of the psychological contract with work engagement and turnover intention, which has hitherto been a largely overlooked topic in psychological contract research. Although previous research has mainly focused on how psychological contracts influence job

  16. Does Work Make Us Free?

    Directory of Open Access Journals (Sweden)

    Lorenzo Toresini,

    2012-12-01

    so-called free private initiative. In capitalism, which does not guarantee work for everybody, the state and society as a whole have simply given up on one of their responsibilities. Work makes us free to the extent to which it brings about integration. At the end of the day integration is the only true therapeutic practice. Psychiatry derives from the tradition of the total institution, which was invented with a single goal in mind: to exclude and repress subjectivity and diversity. From this point of view, particular damage has been caused by the distinction, made at managerial level, between the Health and Social sectors. The truth is that the real cure for mental illness, just as for any other disability, is integration. And there is no better integration than that which involves constructing the world together. As is known the phrase “work makes free” still has a sinister ring related to recent history, displayed as it still is over the entry to the Auschwitz concentration camp: “Arbeit macht frei”. This phrase, which is certainly not devoid of internal logic, was used to attempt to legitimize the horror of the camps. In fact, this logic had simply been adopted from the philosophy and practice of total psychiatric institutions. In accordance with what has been said so far, work as a therapeutic measure has no place outside a free contract with an employer, by making the most of the creative or technical abilities of each individual, which is underlined by the fact that each person is paid for what he actually produces.

  17. 18 CFR 367.4160 - Account 416, Costs and expenses of merchandising, jobbing and contract work.

    Science.gov (United States)

    2010-04-01

    ... expenses of merchandising, jobbing and contract work. 367.4160 Section 367.4160 Conservation of Power and... § 367.4160 Account 416, Costs and expenses of merchandising, jobbing and contract work. (a) This account... sales rooms. (8) Maintaining display counters and other equipment used in merchandising. (9) Arranging...

  18. Making motherhood work

    Directory of Open Access Journals (Sweden)

    Rachel Thomson

    2011-07-01

    Full Text Available Motherhood can be a critical moment in the making of gendered biographies, and in the negotiation of a gendered division of labour within a household. This paper draws on the 'Making of Modern Motherhoods' study, which combined interviews with a diverse group of expectant first time mothers and family case studies in order to build an intergenerational and longitudinal perspective on contemporary mothering situations within the UK. In this paper, the category 'work' is used as a lens through which to encounter new motherhood. After contextualising working motherhood in relation to a sociological literature the paper draws on interviews undertaken with women towards the end of their pregnancy with their first child to reveal something of the emergent collision of working and maternal identities, women's experiences of being pregnant at work including the anticipation and managing of maternity leave. The second part presents a case study, which animates the personal drama involved in reconciling working and maternal commitments, tracing how a woman's feelings about work change over time in negotiation with partner, family and the market. As Sue Sharpe observed in her 1984 book on working mothers, 'full-time mothering has never been accessible to all women in the same way at the same time' (1984: 22. Social class, locality and migration shape a range of cultures of mothering within which work features very differently. Divisions exist between women who share a generational location as well as between women of different generations. This complexity is revealed through a juxtaposition of the voices of mothers and grandmothers, which show how work may both, divide and unite women in the project of motherhood.

  19. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  20. Return-to-work of sick-listed workers without an employment contract – what works?

    Science.gov (United States)

    Vermeulen, Sylvia J; Tamminga, Sietske J; Schellart, Antonius JM; Ybema, Jan Fekke; Anema, Johannes R

    2009-01-01

    Background In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC) interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW) of these workers. Methods A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4–6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract), level of education, reason for absenteeism (diagnosis), and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. Results At 7–9 months after the first day of reporting sick only 19% of the workers had (partially or completely) returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49%) intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC professional made and discussed a

  1. Return-to-work of sick-listed workers without an employment contract – what works?

    Directory of Open Access Journals (Sweden)

    Schellart Antonius JM

    2009-07-01

    Full Text Available Abstract Background In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW of these workers. Methods A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4–6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract, level of education, reason for absenteeism (diagnosis, and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. Results At 7–9 months after the first day of reporting sick only 19% of the workers had (partially or completely returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49% intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC

  2. Proposal for the award of an industrial support contract for indoor fitting work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for indoor fitting work (carpentry, glazing, venetian and roller blinds) at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm ROLAND COSTA MENUISERIE (CH), the lowest bidder, for the provision of indoor fitting work at CERN, for three years for a total amount not exceeding 1 213 403 Swiss francs, not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  3. The impact of environmental stressors and types of work contract on occupational stress.

    Science.gov (United States)

    Corrêa, Ana Paula; Ferreira, Maria Cristina

    2011-05-01

    This study aimed to investigate the impact of seven environmental stressors (role conflict, work overload, interpersonal difficulties, work-family conflict, work instability, lack of autonomy and pressure of responsibility) and the nature of the employment contract (permanent or atypical) on three psychological reactions to occupational stress (job satisfaction, positive emotions, and negative emotions at work). 305 Brazilian workers from both sexes participated in this research, distributed between permanent and atypical workers. The results showed that the role conflict and the work overload had a negative impact on job satisfaction. The role conflict had a negative impact on the positive emotions at work, while the pressure of responsibility interfered positively in it. The work overload interfered positively in the negative emotions at work, while the pressure of responsibility interfered negatively in it. The type of contract did not affect significantly any one of the dependent variables. The implications of the results for future research are discussed.

  4. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J.van den; Taris, T.W.

    2012-01-01

    Objectives: Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable

  5. The Labour Contract as a Basis of Appearance of Labour Relations

    OpenAIRE

    Вишновецька, Світлана Василівна; Національний авіаційний університет; Такаджі, Людмила Геннадіївна; Національний авіаційний університет

    2016-01-01

    The article is devoted to research of labour contract as a basis of appearance of labour relations. The problems of conclusion of labour contract, its entry into force, the time of appearance of the labour relationship are very topical. The labour contract is the main form of realization of the right to work, a basis of appearance of labour relations that makes legal base for their functioning. Before December 28th, 2014 the actual admission to work was a basis of appearance of labour relatio...

  6. Proposal for the award of an industrial support contract for minor civil-engineering work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor civil-engineering work at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm LOSINGER CONSTRUCTION (CH), the lowest bidder, for the provision of minor civilengineering work at CERN for three years for a total amount not exceeding 2 840 278 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  7. 48 CFR 227.7107-2 - Contracts for construction supplies and research and development work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for construction supplies and research and development work. 227.7107-2 Section 227.7107-2 Federal Acquisition Regulations... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-2 Contracts for construction supplies and...

  8. Make Markets Work for Climate

    International Nuclear Information System (INIS)

    2006-11-01

    In developing countries with rapidly growing economies, energy consumption will more than triple by 2030. This will require more than 8 trillion euros in investments in energy in these countries. The way these investments are made will be crucial in determining whether greenhouse gas emissions will rise proportionately. By creating a worldwide, lucrative market for clean technologies, countries can use the money they set aside for fighting climate change to stimulate large-scale private investment in clean energy production and efficient energy consumption. A well-functioning market ensures that money is invested where it will be the most cost-effective and will have the greatest impact in helping to solve a generally recognised problem. This also means making sure that innovations get to the market, so as to take advantage of economies of scale. The conference on 16 and 17 October 2006 in Amsterdam was the official start of the collaboration of governments, business and financial institutions to Make Markets Work for Climate. At the conference it was underlined that coordinated strategies are needed for international financial institutions, private banks, private investors and governments. Business and governments stand shoulder to shoulder in shaping the much needed actions on climate change. The participants agreed that potentially profitable opportunities exist for investment in commercial technologies in developing countries, especially aimed at energy efficiency. An enabling environment is needed in developing countries to attract funds for clean energy. Attention should be paid to less-developed countries. They have difficulty profiting from the current CDM market and are unable to compete on the technology learning curve. In order to make markets work for climate there is a strong need for long-term continuity in the carbon market beyond 2012. Governments need to create stable incentives for business to invest in clean energy technologies. Business is ready

  9. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  10. Permanent Temporariness? Changes in Social Contracts in Knowledge Work

    Directory of Open Access Journals (Sweden)

    Bente Rasmussen

    2012-02-01

    Full Text Available Many sociologists have argued that work no longer plays the central role in contemporary life experience because we have entered an age of insecurity in relation to employment, and knowledge workers are often pictured as egoistical portfolio workers who are only interested in their careers and no longer loyal to their employers. Cappelli (1999 on the other hand argues that more insecure employment relations is a result of employers’ strategy to buy workers rather than offering them long-term relations. Using case studies from seven different knowledge work contexts in Norway, this article argues that more temporary employment relations is not the result of career-seeking portfolio workers, but of changes in employment practices of their employers. These are not primarily changes in the formal employment contracts from permanent to temporary employment, but in the social contracts as they are practiced by the employers and experienced by the knowledge workers in the different contexts of knowledge work. The reason for more temporary relations was not because work does not matter for knowledge workers. On the contrary, we found that they accepted insecure conditions because work mattered and because they were eager to take on new tasks, learn the trade in new fields, and show that they were able to do the job. When they left their employer, it was because they were not able to do a good job in their positions or because they were increasingly directly exposed to an insecure market that signaled that they were not profitable (enough for their employer. Although changes in employment practices by the employers toward more short-term relations are not caused by disloyal portfolio workers, these practices may produce the problem of disloyal workers who have to secure their employment in the labor market.

  11. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  12. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  13. Contraction theory based adaptive synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Sharma, B.B.; Kar, I.N.

    2009-01-01

    Contraction theory based stability analysis exploits the incremental behavior of trajectories of a system with respect to each other. Application of contraction theory provides an alternative way for stability analysis of nonlinear systems. This paper considers the design of a control law for synchronization of certain class of chaotic systems based on backstepping technique. The controller is selected so as to make the error dynamics between the two systems contracting. Synchronization problem with and without uncertainty in system parameters is discussed and necessary stability proofs are worked out using contraction theory. Suitable adaptation laws for unknown parameters are proposed based on the contraction principle. The numerical simulations verify the synchronization of the chaotic systems. Also parameter estimates converge to their true values with the proposed adaptation laws.

  14. Ubiquitous Working: Do Work Versus Non-work Environments Affect Decision-Making and Concentration?

    Directory of Open Access Journals (Sweden)

    Carolin P. Burmeister

    2018-03-01

    Full Text Available New communication technologies and mobile devices have enabled knowledge workers to work independently of location and in more than one fixed environment (ubiquitous working. Previous research shows that physical environments can influence cognition and work performance. We manipulated environment (i.e., a virtual office as a typical work environment compared to a virtual garden as a non-work environment and time pressure (i.e., inducing time pressure vs. no time pressure in order to investigate whether the environment influences decision-making and concentration. N = 109 students participated in this laboratory experiment. We posited (a that a work environment would activate a work-related schema which in turn would enhance concentration performance and make decisions more risky compared to non-work environments and (b that the environmental effect is more pronounced if time pressure is present compared to conditions where no time pressure is present. We found modest hypothesis-confirming main effects of environment on decision-making and concentration but no interaction effect with time pressure. As we used an innovative methodology that entails several limitations, future research is needed to give insights into the process and to investigate whether results hold true for all types of work settings, work demands, or work activities.

  15. Ubiquitous Working: Do Work Versus Non-work Environments Affect Decision-Making and Concentration?

    Science.gov (United States)

    Burmeister, Carolin P; Moskaliuk, Johannes; Cress, Ulrike

    2018-01-01

    New communication technologies and mobile devices have enabled knowledge workers to work independently of location and in more than one fixed environment (ubiquitous working). Previous research shows that physical environments can influence cognition and work performance. We manipulated environment (i.e., a virtual office as a typical work environment compared to a virtual garden as a non-work environment ) and time pressure (i.e., inducing time pressure vs. no time pressure ) in order to investigate whether the environment influences decision-making and concentration. N = 109 students participated in this laboratory experiment. We posited (a) that a work environment would activate a work-related schema which in turn would enhance concentration performance and make decisions more risky compared to non-work environments and (b) that the environmental effect is more pronounced if time pressure is present compared to conditions where no time pressure is present. We found modest hypothesis-confirming main effects of environment on decision-making and concentration but no interaction effect with time pressure. As we used an innovative methodology that entails several limitations, future research is needed to give insights into the process and to investigate whether results hold true for all types of work settings, work demands, or work activities.

  16. A decision-making framework to integrate maintenance contract conditions with critical spares management

    International Nuclear Information System (INIS)

    Godoy, David R.; Pascual, Rodrigo; Knights, Peter

    2014-01-01

    Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits

  17. Can Conservation Contracts Co-exist with Change? Payment for Ecosystem Services in the Context of Adaptive Decision-Making and Sustainability

    Science.gov (United States)

    Hayes, Tanya; Murtinho, Felipe; Cárdenas Camacho, Luis Mario; Crespo, Patricio; McHugh, Sarah; Salmerón, David

    2015-01-01

    This paper considers the ability of payment for ecosystem services (PES) programs to operate in the context of dynamic and complex social-ecological systems. Drawing on the experiences of two different PES programs in Latin America, we examine how PES institutions fit with the tenets of adaptive decision-making for sustainable resource management. We identify how the program goals and the connection to the market influence the incentive structure, information gathering, learning and feedback processes, and the structure of decision-making rights, specifically the ability to make and modify resource-use rules. Although limited in their generalizability, findings from the two case studies suggest a tension between the contractual model of PES and adaptive decision-making in natural resource systems. PES programs are not inherently decentralized, flexible management tools, as PES contracts tend to restrict decision-making rights and offer minimal flexibility mechanisms to change resource-use practices over the duration of the contract period. Furthermore, PES design and flexibility is heavily dependent on the goals and mission of the buyer and the respective market. If PES is to facilitate sustainable resource management, greater attention is needed to assess how the institutional design of the PES contracts influence the motivation and capacity of participants and program officers alike to adaptively manage the respective resource systems.

  18. Can conservation contracts co-exist with change? Payment for ecosystem services in the context of adaptive decision-making and sustainability.

    Science.gov (United States)

    Hayes, Tanya; Murtinho, Felipe; Cárdenas Camacho, Luis Mario; Crespo, Patricio; McHugh, Sarah; Salmerón, David

    2015-01-01

    This paper considers the ability of payment for ecosystem services (PES) programs to operate in the context of dynamic and complex social-ecological systems. Drawing on the experiences of two different PES programs in Latin America, we examine how PES institutions fit with the tenets of adaptive decision-making for sustainable resource management. We identify how the program goals and the connection to the market influence the incentive structure, information gathering, learning and feedback processes, and the structure of decision-making rights, specifically the ability to make and modify resource-use rules. Although limited in their generalizability, findings from the two case studies suggest a tension between the contractual model of PES and adaptive decision-making in natural resource systems. PES programs are not inherently decentralized, flexible management tools, as PES contracts tend to restrict decision-making rights and offer minimal flexibility mechanisms to change resource-use practices over the duration of the contract period. Furthermore, PES design and flexibility is heavily dependent on the goals and mission of the buyer and the respective market. If PES is to facilitate sustainable resource management, greater attention is needed to assess how the institutional design of the PES contracts influence the motivation and capacity of participants and program officers alike to adaptively manage the respective resource systems.

  19. Making residency work hour rules work.

    Science.gov (United States)

    Cohen, I Glenn; Czeisler, Charles A; Landrigan, Christopher P

    2013-01-01

    In July 2011, the ACGME implemented new rules that limit interns to 16 hours of work in a row, but continue to allow 2nd-year and higher resident physicians to work for up to 28 consecutive hours. Whether the ACGME's 2011 work hour limits went too far or did not go far enough has been hotly debated. In this article, we do not seek to re-open the debate about whether these standards get matters exactly right. Instead, we wish to address the issue of effective enforcement. That is, now that new work hour limits have been established, and given that the ACGME has been unable to enforce work hour limits effectively on its own, what is the best way to make sure the new limits are followed in order to reduce harm to residents, patients, and others due to sleep-deprived residents? We focus on three possible national approaches to the problem, one rooted in funding, one rooted in disclosure, and one rooted in tort law. © 2013 American Society of Law, Medicine & Ethics, Inc.

  20. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    Directory of Open Access Journals (Sweden)

    Karen E. C. Levy

    2017-02-01

    Full Text Available This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, and the complex ways in which people use them. In the real world, contractual obligations are enforced through all kinds of social mechanisms other than formal adjudication—and contracts serve many functions that are not explicitly legal in nature, or even designed to be formally enforced. I describe three categories of contracting practices in which people engage (the inclusion of facially unenforceable terms, the inclusion of purposefully underspecified terms, and willful nonenforcement of enforceable terms to illustrate how contracts actually “work.” The technology of smart contracts neglects the fact that people use contracts as social resources to manage their relations. The inflexibility that they introduce, by design, might short-circuit a number of social uses to which law is routinely put. Therefore, I suggest that attention to the social and relational contexts of contracting are essential considerations for the discussion, development, and deployment of smart contracts.

  1. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  2. 21 CFR 14.15 - Committees working under a contract with FDA.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Committees working under a contract with FDA. 14.15 Section 14.15 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... committee: (1) The committee shall give public notice of its meetings and agenda, and provide interested...

  3. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  4. Making a clean break: addiction and Ulysses contracts.

    Science.gov (United States)

    Andreou, Chrisoula

    2008-01-01

    I examine current models of self-destructive addictive behaviour, and argue that there is an important place for Ulysses contracts in coping with addictive behaviour that stems from certain problematic preference structures. Given the relevant preference structures, interference based on a Ulysses contract need not involve questionably favouring an agent's past preferences over her current preferences, but can actually be justified in terms of the agent's current concerns and commitments.

  5. The role of CERN in the large construction contracts for LHC civil works

    CERN Document Server

    D'Aça-Castel-Branco, P

    1998-01-01

    The contracts for the civil engineering construction of the LHC are based upon the standard FIDIC (Fédération Internationale des Ingénieurs Conseils) document entitled "Conditions of Contract for Works of Civil Engineering Construction". FIDIC is a reputable supra-national and world-wide Federation of Consulting Engineers focused on the definition and regulation of the role of many parties involved with the International Construction Industry. An overview of FIDIC's and other Organizations', such as the World Bank, standard documents is presented. The difference between standard Contract documents and standard Bidding documents is pointed out. In view of CERN's status as an intergovernmental Organization, the original FIDIC standard documents needed to be adapted. The modifications are identified and explained. A concise definition of the role of each party concerned by the LHC construction Contracts, i.e. the Contractor, the Engineer and the Client (CERN), is made. Finally, a brief cost-benefit analysis o...

  6. 13 CFR 126.700 - What are the performance of work requirements for HUBZone contracts?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the performance of work... ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.700 What are the performance of work... meet the performance of work requirements set forth in § 125.6(c) of this chapter. (b) In addition to...

  7. Employment contracts: Cross-sectional and longitudinal relations with quality of working life, health and well-being

    NARCIS (Netherlands)

    Kompier, M.; Ybema, J.F.; Janssen, J.; Taris, T.

    2009-01-01

    Objectives: The aim of this study was to enhance (i) insight in the relationship between different types of employment contract and the quality of working life, health and well-being, and (ii) our causal understanding of these relationships by comparing employees whose contract type changes across

  8. Are Emotions Transmitted From Work to Family? A Crossover Model of Psychological Contract Breach.

    Science.gov (United States)

    Liang, Huai-Liang

    2018-01-01

    Based on affective events theory and the crossover model, this study examines the effect of psychological contract breach on employee dysfunctional behavior and partner family undermining and explores the crossover effect of employee dysfunctional behavior on partner family undermining in work-family issues. This study collected 370 employee-partner dyads (277 male employees, 93 female employees, M age = 43.59 years) from a large manufacturing organization. The results of this study support the conception that employees' psychological contract breach results in frustration in the workplace. In addition, mediation analysis results reveal that psychological contract breach relates to employee dysfunctional behavior in the workplace. The findings show that partners' psychological strain mediates the relationship between employee dysfunctional behavior and partner family undermining. Furthermore, these findings provide investigations for the crossover model to display the value of psychological contract breach in family issues.

  9. Custodial Contracting -- How It Worked in One District

    Science.gov (United States)

    Law, James E.

    1975-01-01

    Presents a specific explanation of one school's successful application of custodial contracting. Describes the advantages and disadvantages of the program and provides a sample custodial contract. (Author/DN)

  10. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  11. Ideational struggles over women's part-time work in Norway: Destabilizing the gender contract

    OpenAIRE

    Ellingsæter, Anne Lise; Mosesdottir, Lilja

    2017-01-01

    High rates of part-time work have been associated with high female employment rates in the Nordic countries, except for Finland. Part-time work has played a key role in the modification of the male breadwinner gender contract by enabling women to enter paid work while continuing to take on the main domestic responsibilities. Previously tacit and little disputed, this ‘normalization’ of women’s part-time work has increasingly become a contentious issue in the public debate in Norway, both in t...

  12. Making it work

    DEFF Research Database (Denmark)

    Winther, Jonas

    Within the field of health research, the randomised controlled trial (RCT) is often highlighted as the best method for producing statistically valid evidence about the effects of health interventions. To produce evidence that is also socially relevant, health researchers increasingly perform trials...... outside the laboratory in people’s everyday lives. This creates a situation, in which scientific ideals of methodological rigour must be made to work with trial participants and their ongoing everyday lives. Jonas Winther’s dissertation, Making it Work, explores how this ambition is pursued in practice....... The dissertation builds on Winther’s engagement as an ethnologist in an interdisciplinary research project in Denmark, which was structured around an intervention trial that tested the health effects of exercise in everyday life. Through ethnographic fieldwork among the participants and the researchers...

  13. Micro and small firms contracted the works of third sector contracting and public

    Directory of Open Access Journals (Sweden)

    Daniela Juliano Silva

    2015-06-01

    Full Text Available In a scenario of successive changes, we are faced today with a "new" State of design (First Sector subsidiary and developer, embracing new contracting models, involving private non-profit institutions (Third Sector ahead of social services relevance (health, education, technology, among others. To comply with the obligations entered into with the public entity (end-obligations, this Third Sector performs hires (to perform their half-bonds with the second sector (market, where they operate Micro and Small Businesses. This study aims a reflective look at these contracts, usually the result of simplified bidding process in order to verify their specificities and whether they take place in compliance with the prerogatives and differential treatment meted especially those business companies (art. 170, X, SC / 1988. In this endeavor, it was decided, besides a literature review by an investigative approach from the point of view of three different social organizations that have management contracts in health care with public entities and therefore have signed contracts with ME and EPP for the fulfillment of their obligations to the government.      

  14. Sandia National Laboratories: Working with Sandia: Contract Audit

    Science.gov (United States)

    Defense Systems & Assessments About Defense Systems & Assessments Program Areas Accomplishments Audit Sandia's Economic Impact Licensing & Technology Transfer Browse Technology Portfolios Audit iSupplier Account Accounts Payable Contract Information Construction and Facilities Contract Audit

  15. 20 CFR 655.185 - Job service complaint system; enforcement of work contracts.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job service complaint system; enforcement of... Job service complaint system; enforcement of work contracts. (a) Filing with DOL. Complaints arising under this subpart must be filed through the Job Service Complaint System, as described in 20 CFR part...

  16. Law, skills and the creation of jobs as "contract" work in India: Exploring survey data to make inferences for labour law reform

    OpenAIRE

    Singh, Jaivir; Das, Deb Kusum; Choudhury, Homagni; Kukreja, Prateek

    2016-01-01

    The paper begins with a discussion of Indian labour law and the increasing use of "contract labour" in Indian formal manufacturing. We question the widespread perception that employment of contract labour provides flexibility to employers in terms of adjustment in response to demand and technology shocks, by bringing in the concept of "incomplete contracts". Apart from the ASI data, we use the responses from a specially commissioned survey in Haryana: a state having a well-established industr...

  17. 29 CFR 5.15 - Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety...

    Science.gov (United States)

    2010-07-01

    ... minimum hourly wage required under the contract pursuant to the provisions of the Service Contract Act of... premium payment of one-half times such minimum hourly wage for all hours worked in excess of 40 hours in... this section are met. (ii) The apprentice or trainee comes within the definition contained in § 5.2(n...

  18. PERCEPTIONS OF THE PSYHOLOGICAL CONTRACT IN WORKING LIFEAND AN APPLICATION IN THE SERVICE SECTOR

    Directory of Open Access Journals (Sweden)

    Şenol Yaprak

    2016-07-01

    Full Text Available Unlike employment agreement, psychological contract comprises not only bothsides of the covenant in an employment relation but also involves the promisesand obligations being dependent on all types of perceived spoken messages,attitudes, and behaviours between the parties. As the individuals in various wayscan form this perception, the results during the process and the reflections to theworking life may display differences. The purpose of this study is to investigatethe impacts of the psychological contract on the relationship between employeeand employers. It is also within the scope of this study to evaluate the effects ofthe demographic characteristics such as gender, age, marital status, academicbackground, job tenure on psychological contract. In this study, firstly, the term“psychological contract” is examined, then employees’ ideas related topsychological contract are tried to be identified in health facilities and retailing sector in which flexible working is intensely implemented. The analyses of datacollected from the questionnaires have revealed the employees’ opinions abouttheissues within the context of psychological contract. When the results of this studyare assessed, it is concluded that demographic characteristics stated by theparticipants did not show any significant variation in the perception of bothorganizational and employees’ commitments.

  19. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  20. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  1. Conditions of contract for construction for building and engineering works designed by the employer : general conditions : guidance for the preparation of particular conditions forms of letter of tender, contract agreement and dispute adjudication agreement

    CERN Document Server

    1999-01-01

    Conditions of Contract for Construction, which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constructs the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical, electrical and/or construction works.

  2. Making working in retailing interesting

    DEFF Research Database (Denmark)

    Esbjerg, Lars; Buck, Nuka; Grunert, Klaus G.

    2010-01-01

    This paper is about how five retail chains in the Danish grocery industry attempt to make low-wage, low-status store-level retail jobs as checkout operators and sales assistants interesting from the perspective of both retailers and employees. Following analysis of the social and institutional...... and make store-level retail jobs interesting to them. Although retailers mainly focus their attention on career seekers, we find that working in retailing is interesting for all employee types because the retailers are currently able to meet their respective motivations and aspirations. Nevertheless, we...

  3. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  4. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  5. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  6. Efficient preloading of the ventricles by a properly timed atrial contraction underlies stroke work improvement in the acute response to cardiac resynchronization therapy

    Science.gov (United States)

    Hu, Yuxuan; Gurev, Viatcheslav; Constantino, Jason; Trayanova, Natalia

    2013-01-01

    Background The acute response to cardiac resynchronization therapy (CRT) has been shown to be due to three mechanisms: resynchronization of ventricular contraction, efficient preloading of the ventricles by a properly timed atrial contraction, and mitral regurgitation reduction. However, the contribution of each of the three mechanisms to the acute response of CRT, specifically stroke work improvement, has not been quantified. Objective The goal of this study was to use an MRI-based anatomically accurate 3D model of failing canine ventricular electromechanics to quantify the contribution of each of the three mechanisms to stroke work improvement and identify the predominant mechanisms. Methods An MRI-based electromechanical model of the failing canine ventricles assembled previously by our group was further developed and modified. Three different protocols were used to dissect the contribution of each of the three mechanisms to stroke work improvement. Results Resynchronization of ventricular contraction did not lead to significant stroke work improvement. Efficient preloading of the ventricles by a properly timed atrial contraction was the predominant mechanism underlying stroke work improvement. Stroke work improvement peaked at an intermediate AV delay, as it allowed ventricular filling by atrial contraction to occur at a low diastolic LV pressure but also provided adequate time for ventricular filling before ventricular contraction. Diminution of mitral regurgitation by CRT led to stroke work worsening instead of improvement. Conclusion Efficient preloading of the ventricles by a properly timed atrial contraction is responsible for significant stroke work improvement in the acute CRT response. PMID:23928177

  7. Creating a Classroom Team: How Teachers and Paraprofessionals Can Make Working Together Work

    Science.gov (United States)

    American Federation of Teachers (NJ), 2004

    2004-01-01

    Respect and communication. That's what teachers and paraprofessionals say makes an effective classroom team. In speaking with paraprofessionals and teachers, the American Federation of Teachers (AFT) has gathered several tips about how to make working together work. These tips include: (1) Creating a healthy, open relationship between teacher and…

  8. Psychological contract breach and work performance: Is social exchange a buffer or an intensifier?

    NARCIS (Netherlands)

    Bal, P.M.; Chiaburu, D.S.; Jansen, P.G.W.

    2010-01-01

    Purpose: The aim of this paper is to investigate how social exchanges modify the relationship between psychological contract breach and work performance. It aims to present two concurrent hypotheses, based on theoretical interaction effects of social exchanges (conceptualized as social exchange

  9. Making Michigan Right-to-Work: Implementation Problems in Public Schools

    Science.gov (United States)

    Spalding, Audrey

    2014-01-01

    This paper examines how public school districts responded to Michigan's 2012 "right-to-work" law. It describes the key findings from reviews of more than 500 teacher collective bargaining agreements. It also raises several questions about the legality of some union contracts with regard to this new law. Approximately 75 percent of…

  10. Swift and Smart Decision Making: Heuristics that Work

    Science.gov (United States)

    Hoy, Wayne K.; Tarter, C. J.

    2010-01-01

    Purpose: The aim of this paper is to examine the research literature on decision making and identify and develop a set of heuristics that work for school decision makers. Design/methodology/approach: This analysis is a synthesis of the research on decision-making heuristics that work. Findings: A set of nine rules for swift and smart decision…

  11. Trends in family labour, hired labour and contract work on french fieldcrop farms: the role of agricultural policies

    OpenAIRE

    Dupraz, Pierre; Latruffe, Laure

    2010-01-01

    This article analyses the factors driving the evolution of on-farm labour use, including own family labour, hired labour and contract work, in French fieldcrop farms during 1990-2007. Particular attention is given to the level and type of agricultural support. The increase in the farm labour force over the years is due to increases in hired labour and contract work which are complements for each other rather than substitutes, and complement for family labour. Crop area payments and Single Far...

  12. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  13. Brief considerations on the acquisition of works of art in the European regulation of public contracts

    Directory of Open Access Journals (Sweden)

    Pierpaolo Forte

    2017-11-01

    Full Text Available The work, renouncing to a precise definition of art, acknowledges that there are art objects and cultural objects, which, in this way, are relevant also in legal terms, and try to advance some reflections on the relevance of art in relation to the European discipline of public contracts and, in particular, what can be deduced from Directive 2014/24 / EU, which can well be understood as a sort of cultural sign that can provide insights into how art is perceived in Europe, even in political terms, in this historical phase. The paper therefore examines the use of negotiated procedures without prior publication of a contract notice, for the «creation or acquisition of a unique work of art or artistic performance», and to do so faces the problem of the object of the procurement by “contracting authorities” which deals with things or performances (works, supplies or services relating to artistic products, by examining the needs which a public administration may have in relation to obtaining the availability of a work of art, and the different modes of this type of acquisition. Finally, the study examines the theme of «art exhibitions», trying to prove that they are autonomous objects, which are represented in the European directive under the diction «artistic performance».

  14. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S. van den; Smulders, P.G.W.; Taris, T.W.

    2012-01-01

    Study aim: We hypothesise that due to a lower quality of working life and higher job insecurity, the health and workrelated attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent

  15. 48 CFR 32.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract financing... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.007 Contract financing payments. (a)(1) Unless... section, the due date for making contract financing payments by the designated payment office is the 30th...

  16. Features of the Maintenance Agreement (Contract for the Delivery of Goods, Works and Services for State and Municipal Needs

    Directory of Open Access Journals (Sweden)

    Evgeniya V. Loginova

    2015-12-01

    Full Text Available Article analyzes main features of the agreement (contract for the delivery of goods, works and services for state and municipal needs. It is shown that civil-legal nature of this agreement, which aims to meet the public interest. It is emphasized that this agreement is the special subject composition. Features of this type of contract, which is manifested in the use of special methods of placing state and municipal orders are shown. It is proved that for the public contract subject of the contract will depend on the considered whether the supply agreement or service contract. Existing in the modern civil law doctrine approaches to understanding the essential terms of the contract are analyzed. Features of pricing in this agreement is shown. It was concluded that, in contrast to other types of civil contracts, state contract has a wide range of essential conditions.

  17. Incentive contracts and time use

    OpenAIRE

    Tor Viking Eriksson; Jaime Ortega

    2011-01-01

    Empirical studies on incentive contracts have primarily been concerned with the effects on employees’ productivity and earnings. The productivity increases associated with such contracts may, however, come at the expense of quality of life at or outside work. In this paper we study the effect on the employees’ non-work activities, testing whether incentive contracts lead to a change in the allocation of time across work and non-work activities. In doing so, we distinguish between two effects,...

  18. Contracts in Public Administration

    Directory of Open Access Journals (Sweden)

    Agnieszka GRZESIOK-HOROSZ

    2011-03-01

    Full Text Available Objectives: The present makes a contribution to the discussion on contracts in administration under Polish law. It concentrates on theoretical issues, but ones of considerable practical significance. Prior Work though relatively poorly explored, field. This paper is a result of academic considerations on the classical institution of civil law, namely a bilateral juridical act significance of this area may be demonstrated by the fact that one scientific conference and a collection of papers have been devoted to contracts in administration. as research method, the analysis of jurisprudence and doctrinal writings referring to law currently in force. The paper discusses as well the draft of the administrative law, and includes comparative remarks. put forward certain comments pertainin legislation. The authors formulate as well outline theses interesting but complicated matters. As a voice in the doctrinal dispute it can als useful for law students. Value composition. Starting from gener the binding law and proposed amendments. The functioning in foreign countries and proposals of regulatory solutions.

  19. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  20. 78 FR 33605 - Process for a Designated Contract Market or Swap Execution Facility To Make a Swap Available to...

    Science.gov (United States)

    2013-06-04

    ... indexed swap (OIS)); currency (e.g., U.S. dollar, euro, British pound, Japanese yen); floating rate index... 37 and 38 Process for a Designated Contract Market or Swap Execution Facility To Make a Swap Available to Trade, Swap Transaction Compliance and Implementation Schedule, and Trade Execution Requirement...

  1. 48 CFR 32.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract price. 32.501-3... REQUIREMENTS CONTRACT FINANCING Progress Payments Based on Costs 32.501-3 Contract price. (a) For the purpose of making progress payments and determining the limitation on progress payments, the contract price...

  2. Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?

    Science.gov (United States)

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-07-01

    Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation of performance-based contracting (i.e. use of strict time registration rules and cost-efficiency measures) and autonomy and intrinsic job satisfaction. We hypothesised that: use of strict time registration rules and cost-efficiency measures relates to lower levels of autonomy and intrinsic job satisfaction (H1); there is an indirect relationship between use of strict time registration rules and use of cost-efficiency measures and intrinsic job satisfaction via autonomy (H2); higher levels of management support relate to the use of looser time registration rules and less use of cost-efficiency measures (H3); and higher levels of management support relate to higher levels of autonomy and intrinsic job satisfaction (H4). We used data from a cross-sectional survey conducted in 2010 of a sample of Dutch home-care workers (N = 156, response rate = 34%). Overall, our study suggests that the consequences of performance-based contracting for professionalism are ambiguous. More specifically, using strict time registration rules is related to lower levels of autonomy, whereas using cost-efficiency measures does not seem to affect autonomy (H1). Performance-based contracting has no consequences for the level of fulfilment home-care workers find in their job, as neither of the two contracting dimensions measured was directly or indirectly related to intrinsic job satisfaction (H1, H2). The role of managers must be taken into account when studying performance-based contracting, because perceived higher management support is related to managers' less frequent use of both strict time registration rules and of cost-efficiency measures (H3). The insight we gained into the importance of

  3. Making sustainability work

    International Nuclear Information System (INIS)

    Binswanger, Hans Christoph

    1998-01-01

    Today's economic theory usually neglects the role of nature and environment. To make sustainability work it is, however, essential to (re-)integrate nature into the standard concepts of economics, especially by incorporating natural factors into the production function. It must be acknowledged that economic growth is not (only) the result of technical change but is mainly caused by rising energy-inputs into the economy, and that this is necessarily followed by resource exhaustion and pollution. Therefore, nature must not only be taken into account as a central factor of production but also in the form of environmental quality which is the basis for human quality of life. A numeric example shows that a small, but steady decrease of yearly resource consumption is already apt to redirect the economy on a path of sustainable development

  4. Optimal Long-term Contracting with Learning

    OpenAIRE

    Jianfeng Yu; Bin Wei; Zhiguo He

    2012-01-01

    This paper introduces profitability uncertainty into an infinite-horizon variation of the classic Holmstrom and Milgrom (1987) model, and studies optimal dynamic contracting with endogenous learning. The agent's potential belief manipulation leads to the hidden information problem, which makes incentive provisions intertemporally linked in the optimal contract. We reduce the contracting problem into a dynamic programming problem with one state variable, and characterize the optimal contract w...

  5. Nurse manager cognitive decision-making amidst stress and work complexity.

    Science.gov (United States)

    Shirey, Maria R; Ebright, Patricia R; McDaniel, Anna M

    2013-01-01

      The present study provides insight into nurse manager cognitive decision-making amidst stress and work complexity.   Little is known about nurse manager decision-making amidst stress and work complexity. Because nurse manager decisions have the potential to impact patient care quality and safety, understanding their decision-making processes is useful for designing supportive interventions.   This qualitative descriptive study interviewed 21 nurse managers from three hospitals to answer the research question: What decision-making processes do nurse managers utilize to address stressful situations in their nurse manager role? Face-to-face interviews incorporating components of the Critical Decision Method illuminated expert-novice practice differences. Content analysis identified one major theme and three sub-themes.   The present study produced a cognitive model that guides nurse manager decision-making related to stressful situations. Experience in the role, organizational context and situation factors influenced nurse manager cognitive decision-making processes.   Study findings suggest that chronic exposure to stress and work complexity negatively affects nurse manager health and their decision-making processes potentially threatening individual, patient and organizational outcomes.   Cognitive decision-making varies based on nurse manager experience and these differences have coaching and mentoring implications. This present study contributes a current understanding of nurse manager decision-making amidst stress and work complexity. © 2012 Blackwell Publishing Ltd.

  6. Assessment of work-related muscle strain by using surface EMG during test contractions interposed between work periods of simulateted mushroom picking

    DEFF Research Database (Denmark)

    Ohashi, Jun-Ya; Blangsted, Anne Katrine; Nielsen, Pernille Kofoed

    2010-01-01

    Surface electromyograms(EMG) during test contractions (TCs) were studied to assess the muscle strain in simulated mushroom picking. Additionally, the duration of the TC for the effective assessment was investigated. Nine female subjects performed standardized shoulder abduction and a stooped...... posture for one minute as TCs. Each experiment consisted of a 60-min rest, three work periods (W1-W3), a 30-min rest, and two work periods (W4 and W5) separated by a 30-min rest period. The duration of each work period was about 20 min. A total of 18 TCs was performed between the work periods and every 10...

  7. Memories of early work on muscle contraction and regulation in the 1950's and 1960's

    International Nuclear Information System (INIS)

    Huxley, Hugh E.

    2008-01-01

    Professor Ebashi's epic work on the biochemistry of the regulation of muscle contraction began in the early 1950's, during the same period that work on the molecular basis of force production in muscle was also beginning. The latter work started in two MRC Research Units in the UK, and was continued jointly by the two workers from those Units who had, independently, gone to MIT to learn the new techniques of electron microscopy and to apply them to muscle. In a somewhat similar fashion, Professor Ebashi also spent one or two years in the USA, continuing his work on the role of calcium in muscle regulation in Lippman's laboratory, before returning to Japan to achieve the great breakthroughs in this work during the 1960's. Hanson and Huxley, after putting forward the overlapping actin and myosin filament arrays model for the striated muscle sarcomere, and subsequently the sliding filament model of muscle contraction (simultaneously with A.F Huxley and R. Niedergerke), returned to the UK to pursue detailed structural studies in separate Research Units, in a mixture of consultation, collaboration, and competition, during the later 1950's and throughout the 1960's. However, the path to enlightenment described here in some detail was somewhat more tortuous than the standard literature perhaps reveals. Nevertheless, by the time of the Cold Spring Harbor Symposium on Muscle Contraction in 1972, the two lines of enquiry on regulation itself, and on the tilting cross-bridge model of force production, had arrived at a good deal of common ground, and indeed the identification of troponin and its periodic distribution along the actin filaments had helped resolve a long-standing puzzle in the interpretation of the low angle X-ray diagram. Since then, an enormous amount of remarkable new work has been necessary to establish troponin regulation and the tilting cross-bridge mechanism in molecular detail, but the work in the 1950's and 1960's has provided a firm and accurate basis

  8. Terms of payment in the sales contract

    OpenAIRE

    Harmáčková, Iva

    2009-01-01

    This thesis makes an analysis of price and terms of payment in the sales contract. Both elements are conceived in terms of legal framework and in terms of importance for the parties to an international sales contract. The theoretical part deals with the role of the sales contract in business relations, structure and legal norms of the international sales contract. The practical part includes an analysis of specific international sales contract.

  9. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  10. Contractibility of financial statement information prepared under IFRS: Evidence from debt contracts around IFRS adoption

    OpenAIRE

    Shivakumar, L; Ball, R; Li, X

    2015-01-01

    We outline several properties of IFRS that potentially affect the contractibility or the transparency of financial statement information, and hence the use of that information in debt contracts. Those properties include the increased choice among accounting rules IFRS gives to managers, enhanced rule-making uncertainty, and increased emphasis on fair value accounting. Consistent with reduced contractibility of IFRS financial statement information, we find a significant reduction in accounting...

  11. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  12. Contract law for physicians. The basics.

    Science.gov (United States)

    Eelkema, R

    1989-02-01

    As part of the Minnesota Medical Association's ongoing contract review process, this article provides information to help educate physicians about the major managed care contracts being offered to them. The information provided is not intended to, nor should it be a substitute for legal advice pertaining to an individual's practice and specific contracts with third parties. The MMA will not be making recommendations regarding the merits of any particular contract. A decision to enter into a contract rests with the physician and his or her clinic in consultation with private legal counsel.

  13. The Relationship between the Employment Contract and other Civil Contracts

    OpenAIRE

    Răzvan Radu Popescu

    2015-01-01

    The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is...

  14. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  15. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  17. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  18. Making Sense Bringing Everyday Life at Work

    DEFF Research Database (Denmark)

    Egmose, Jonas; Gleerup, Janne; Nielsen, Birger Steen

    Inspired by contemporary work life studies on making sense at work this paper elaborates on using Critical Utopian Action Research as methodology for enabling shared learning spaces in which citizens and professionals can conjoin around discussions of deeper human aspirations enabled through...... synergies between civil engagement and organisational capabilities. The paper reports on experiences with enabling free spaces in the contexts of everyday life, where broader human concerns and aspirations can be addressed, as in the context of work life, where organisational responses on these orientations...

  19. Work and family decision-making framework: A motivational perspective

    OpenAIRE

    Chinchilla, Nuria; Moragas, Maruja; Kim, Sowon

    2012-01-01

    We introduce motivation theory as a way of understanding the decision-making process in the work and family context. We use core concepts from motivation theory - extrinsic, intrinsic and prosocial motivation - and link them to motivational learning to build our framework. We then propose a framework illustrating motivational factors that influence work-family decision-making and offer propositions focusing on the motivational consequences for individuals which will impact their future decisi...

  20. OBJECT OF THE CONTRACT FROM THE PERSPECTIVE OF THE CURRENT CIVIL CODE

    Directory of Open Access Journals (Sweden)

    Raluca Antoanetta TOMESCU

    2017-07-01

    Full Text Available An indispensable element of social relations, primarily the contract governs our existence. Virtually anything in our lives is governed by contracts. Any move we make, school, work performed, marriage, holidays, a house or a new car, will lead to the acceptance of a contract, or are a consequence of their existence. In the light of the codifications set forth in the current Civil Code, which regularly follows the modern proposals for contract rules, the legislator gives us a clear perspective on its essential conditions of validity. Thus, along with the ability to contract and the consent of the parties, as essential conditions of validity of the contract, the cause and object of the contract also arise. The purpose of this study is therefore to reflect upon the meaning of some terms such as "the object of the contract", "the object of the obligation" or "the object of the benefit" in agreement with the regulations contained in the current Civil Code, especially because in practice but sometimes also in legal doctrine, sufficient attention is not given to the legal sense of each of them, the current rule bringing clarifying regulations.

  1. Contract-based Internet Service Software Development

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Schneider, Gerardo

    The fast evolution of the Internet has popularized service-oriented architectures dynamic IT-supported inter-business collaborations. Yet, interoperability between different organizations, requires contracts to reduce risks. Thus, high-level models of contracts are making their way into service...

  2. 29 CFR 4.121 - Contracts for individual services.

    Science.gov (United States)

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Specific Exclusions § 4.121 Contracts for individual services. The Act... to an “employment contract” for “direct services,” makes it clear that the Act's application to... contract service, the exemption applies and the contract will not be subject to the Act's provisions. The...

  3. Global work contexts as sites of discursive sense making

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2014-01-01

    Global work contexts represent highly complex working environments with simultaneous attachment to several projects and teams (Rosen, Furst & Blackburn, 2007). This complexity increases the for the sense-making capabilities of employees (Weick, 1995). MyPhD project examines this sense-making proc...... of knowledge communication networks in a global organisation. Interviews were fully transscribed analysed using a combination of James Gee’s approach to discourse analysis, and a novel adaptation of Auatin’s speech act theory....

  4. Social contract theory and just decision making: lessons from genetic testing for the BRCA mutations.

    Science.gov (United States)

    Williams-Jones, Bryn; Burgess, Michael M

    2004-06-01

    Decisions about funding health services are crucial to controlling costs in health care insurance plans, yet they encounter serious challenges from intellectual property protection--e.g., patents--of health care services. Using Myriad Genetics' commercial genetic susceptibility test for hereditary breast cancer (BRCA testing) in the context of the Canadian health insurance system as a case study, this paper applies concepts from social contract theory to help develop more just and rational approaches to health care decision making. Specifically, Daniel's and Sabin's "accountability for reasonableness" is compared to broader notions of public consultation, demonstrating that expert assessments in specific decisions must be transparent and accountable and supplemented by public consultation.

  5. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Directory of Open Access Journals (Sweden)

    Randive Bharat

    2012-12-01

    Full Text Available Abstract Background Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC in rural India. Methods Facility survey was conducted in all secondary and tertiary public health facilities (44 in three heterogeneous districts in Maharashtra state of India. Interviews (42 were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Results Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month. The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Conclusions Density and geographic distribution of private specialists are important

  6. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Science.gov (United States)

    Randive, Bharat; Chaturvedi, Sarika; Mistry, Nerges

    2012-12-31

    Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC) in rural India. Facility survey was conducted in all secondary and tertiary public health facilities (44) in three heterogeneous districts in Maharashtra state of India. Interviews (42) were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS) provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month). The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Density and geographic distribution of private specialists are important influencing factors in determining feasibility and use of

  7. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  8. Another Look at Helmholtz's Model for the Gravitational Contraction of the Sun

    Science.gov (United States)

    Tort, A. C.; Nogarol, F.

    2011-01-01

    We take another look at the Helmholtz model for the gravitational contraction of the Sun. We show that there are two other pedagogically useful ways of rederiving Helmholtz's main results that make use of Gauss's law, the concept of gravitational field energy and the work-kinetic energy theorem. An account of the energy balance involved in the…

  9. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  10. Supporting the diversity of B2B e-contracting processes

    NARCIS (Netherlands)

    Angelov, S.A.; Grefen, P.W.P.J.

    2008-01-01

    Contracts specify the rights and obligations of the contracting parties. Information technologies can make e-contracting more efficient and effective. A process model for flexible B2B e-contracting is proposed that separates concerns by distinguishing function and communication perspectives of

  11. Psychological contract breach and work performance:Is social exchange a buffer or an intensifier?

    OpenAIRE

    Bal, P. Matthijs; Chiaburu, Dan S.; Jansen, Paul G. W.

    2010-01-01

    Purpose: The aim of this paper is to investigate how social exchanges modify the relationship between psychological contract breach and work performance. It aims to present two concurrent hypotheses, based on theoretical interaction effects of social exchanges (conceptualized as social exchange relationships, POS, and trust). Design/methodology/approach: Data were collected from a sample of 266 employees in a service sector company in the USA. Regression analysis was used to explore the moder...

  12. Review of Hanushek "Making Schools Work"

    Directory of Open Access Journals (Sweden)

    Herbert Gintis

    1995-03-01

    Full Text Available Making Schools Work is about the economics of educational policy. The Brookings Institution, publisher of the volume, is among the most respected institutions of economic policy research in the United States. The analysis and recommendations offered by Eric Hanushek, Professor of Economics at the University of Rochester, are based on original research financed by the Pew Charitable Trusts, and carried out by a distinguished group of economists.

  13. Contract law for the hospital and health administrator.

    Science.gov (United States)

    Bates, P W

    1986-01-01

    The author discusses the concept of a legal 'contract' and gives many examples of its application in hospitals and health settings. He describes the main features of a contract and gives special attention to personnel and clinical ramifications and to the role of agents in making contracts on behalf of hospitals.

  14. Linkage between Psychological Contract and Employee Retention

    African Journals Online (AJOL)

    GRACE

    strengthened by clearly stating expectations during recruitment and ... Impact of psychological contract in a work environment vis-à-vis employee retention, ..... psychological contract that will incite a faithful, fruitful and fulfilled work team.

  15. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  16. Contract farming with possible reneging in a developing country: Can it work?

    Directory of Open Access Journals (Sweden)

    Woonghee Tim Huh

    2012-12-01

    Full Text Available We consider a processed-food manufacturer that faces uncertain exogenous demand and procures a farm crop either from the outside market or from local farmers via contract farming. The contract price is determined at the beginning of the season when the market price is still uncertain. When the market price is realised, we allow the farmer the possibility of reneging from the contract, which occurs if the market price is sufficiently high. We show that granting farmers the option of reneging on the contract may improve the manufacturer's expected profit, and identify the conditions under which such an improvement can be expected.

  17. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  18. On the Dogmatics of Contract Interpretation

    Institute of Scientific and Technical Information of China (English)

    Yang Guoqing

    2017-01-01

    The interpretation of contract has attracted much attention in the practice of contract law and the basic problems to be solved are what the parties agree on and how to set up the rules of adjudication. The present domestic studies are not conducive to contract prac-tices because they either unnecessarily elevate scientific problems to the speculative realm of fantasy, or make the problems become more unreal and abstract. The two traditional theories of contract interpretation do not conflict in values in terms of the autonomy of the will and trust protection. However, in today' s society where cultural pluralism and legal value plural-ism exist, because of different contract practices, differentiation and individualization of con-tract interpretation will become the basic patterns. Therefore, it is impossible and unnecessary to construct a unitary model, but it is of great significance to introduce the dogmatics-orien-ted contract interpretation.

  19. Muscle contraction duration and fibre recruitment influence blood flow and oxygen consumption independent of contractile work during steady-state exercise in humans.

    Science.gov (United States)

    Richards, Jennifer C; Crecelius, Anne R; Kirby, Brett S; Larson, Dennis G; Dinenno, Frank A

    2012-06-01

    We tested the hypothesis that, among conditions of matched contractile work, shorter contraction durations and greater muscle fibre recruitment result in augmented skeletal muscle blood flow and oxygen consumption ( ) during steady-state exercise in humans. To do so, we measured forearm blood flow (FBF; Doppler ultrasound) during 4 min of rhythmic hand-grip exercise in 24 healthy young adults and calculated forearm oxygen consumption ( ) via blood samples obtained from a catheter placed in retrograde fashion into a deep vein draining the forearm muscle. In protocol 1 (n = 11), subjects performed rhythmic isometric hand-grip exercise at mild and moderate intensities during conditions in which time-tension index (isometric analogue of work) was held constant but contraction duration was manipulated. In this protocol, shorter contraction durations led to greater FBF (184 ± 25 versus 164 ± 25 ml min(-1)) and (23 ± 3 versus 17 ± 2 ml min(-1); both P flow. Our collective data indicate that, among matched workloads, shorter contraction duration and greater muscle fibre recruitment augment FBF and during mild-intensity forearm exercise, and that muscle blood flow is more closely related to metabolic cost ( ) rather than contractile work per se during steady-state exercise in humans.

  20. Making bilateral competition work

    International Nuclear Information System (INIS)

    Parkinson, T.

    1996-01-01

    Two alternative arrangements that have been advocated to implement California's proposed institution of retail wheeling are compared. San Diego Gas and Electric and Southern California Edison proposed the development of a centralized power pool (as in the United Kingdom) that would act as a spot market for buying and selling power. By contrast, Pacific Gas and Electric and Enron Power Marketing support individual contracts between suppliers and customers with centralized operator dispatch. The basic functional elements of two transmission systems that could support direct access are reviewed. 4 figs., 11 tabs., 10 refs

  1. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  2. 48 CFR 970.2303-3 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... facility, the clause at 48 CFR 970.5223-1, Integration of Environment, Safety and Health into Work Planning..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a) When work under management and operating contracts and subcontracts thereunder is to be performed at a...

  3. Working-Memory Load and Temporal Myopia in Dynamic Decision Making

    Science.gov (United States)

    Worthy, Darrell A.; Otto, A. Ross; Maddox, W. Todd

    2012-01-01

    We examined the role of working memory (WM) in dynamic decision making by having participants perform decision-making tasks under single-task or dual-task conditions. In 2 experiments participants performed dynamic decision-making tasks in which they chose 1 of 2 options on each trial. The decreasing option always gave a larger immediate reward…

  4. An Empirical Study of the Contracting Officer Representative’s Social Network

    Science.gov (United States)

    2013-09-01

    portion for this contract. This was a mixed time and materials/firm fixed price so it had to go firm fixed price which ties our hands somewhat, and it’s...they’re doing now, that they should be sending more work their way, is kind of what they are doing. They are marketing themselves, is really what they...make sure we keep on schedule, monthly meetings plus whatever conversations are needed, like work that’s being done on this NIKE site, communication

  5. Corruption in PPPs, Incentives and Contract Incompleteness

    OpenAIRE

    Elisabetta Iossa; David Martimort

    2014-01-01

    In a public procurement setting, we discuss the desirability of completing contracts with state-contingent clauses providing for monetary compensations to the contractor when revenue shocks occur. Realized shocks are private information of the contractor and this creates agency costs of delegated service provision. Verifying the contractor’s messages on the shocks entails contracting costs that make incomplete contracts attractive, despite their higher agency costs. A public official (supervi...

  6. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  7. Standard forms of construction contracts in Romania

    Directory of Open Access Journals (Sweden)

    Cristian Bănică

    2013-12-01

    Full Text Available Construction industry in Romania is under pressure to modernize in order to cope with the new demands of development and convergence with EU. Contractual procedures in construction have to become an integral part in this process of modernization. The article makes an introduction to the advantages of standard forms of contract and professional contract administration in construction and presents the current state-of-the art in the use of standard construction contracts in Romania. Some practical conclusions and recommendations are presented considering the need for further contract studies.

  8. The Impact of the Choice of Evaluation Criteria and the Type of Tender on the Awarding Public Contracts (in the Case of Construction Contracts at the Local Level in the Czech Republic

    Directory of Open Access Journals (Sweden)

    František Ochrana

    2015-01-01

    Full Text Available Public procurement may be examined from different perspectives. Using the Czech Republic as an example, this study is devoted to examining the impact of decisions made by the contracting authority regarding a public tender on the tender process itself and on the outcomes of the tender. The contracting authority addresses a number of decision-making issues regarding public procurements. For example, it needs to decide between two types of criteria (choosing between a single-criterion evaluation or rather opting for several evaluation criteria. At the same time, the authority is free to choose among different types of award procedures while adhering to certain restrictions imposed by the Act on Public Contracts. Using a sample of 1,027 construction work contracts awarded in the Czech Republic, the study examines, in more detail, the impacts of individual choices made by the contracting authority (namely the type of evaluation criteria chosen and the type of procedure for awarding contracts on the estimated and final price of public contracts. Recommendations on how to streamline the process of public procurement can be drawn from conclusions from the empirical analysis.

  9. Contract Teachers: Experimental Evidence from India. NBER Working Paper No. 19440

    Science.gov (United States)

    Muralidharan, Karthik; Sundararaman, Venkatesh

    2013-01-01

    The large-scale expansion of primary schooling in developing countries has led to the increasing use of non-civil-service contract teachers who are hired locally by the school, are not professionally trained, have fixed-term renewable contracts, and are paid much lower salaries than regular civil-service teachers. This has been a controversial…

  10. Making integrated rural development programmes work: A ...

    African Journals Online (AJOL)

    It follows from the foregoing that The Bank will assist poor countries with grants or soft loans to pilot-test the C4D strategy. The C4D strategy has been field-tested and, therefore, offers great promise of making poverty reduction programmes work more sustainably. It is inexcusable, therefore, for developing countries not to try ...

  11. Trends in family labour, hired labour and contract work on French and Swiss crop farms: The role of agricultural policies

    OpenAIRE

    Dupraz, Pierre; Latruffe, Laure; Mann, Stefan

    2010-01-01

    The objective of this article is to analyse the trends in on-farm labour use, including own family labour, hired labour and contract work, and to assess the factors driving their evolution in France and in Switzerland during 1990-2007. A particular attention is given to agricultural policies, namely the level and type of support. Results indicate that crop area payments discourage the different labour demands in both countries, while environment and investment payments favour contract and hir...

  12. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  13. 41 CFR 50-201.1 - The Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... Contracts Act. 50-201.1 Section 50-201.1 Public Contracts and Property Management Other Provisions Relating... Walsh-Healey Public Contracts Act. The Walsh-Healey Public Contracts Act, as amended (41 U.S.C. 35-45... making of contracts by the United States.” It is not an act of general applicability to industry. The...

  14. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  15. Union Contracts and Teacher Professional Development

    Directory of Open Access Journals (Sweden)

    Paul V. Bredeson

    2001-07-01

    Full Text Available In this article, I report the results of an investigation that examined the impact of teacher union contracts on the development of professional learning communities in schools. There are three primary sources of data used in the study: 1 100 written teacher union contract documents; 2 structured interview data from 21 educators (school superintendents, principals, directors of staff development, and teacher union representatives; and 3 focus group interview data from educational leaders in schools. The analysis and discussion focus on five areas related to teacher professional development with implications for policy and practice: explicit language covering opportunities for teaching learning in their work; governance and decision making structures, that is, specific provisions covering wages, hours, and conditions of employment; the description of legitimate and sponsored activities for the professional development of teachers; and the resources supporting the on-going professional growth of teachers. The findings indicate that rethinking, restructuring, and organizational re-culturing in schools are initial expressions of a new unionism that has the potential to lead to the development of more powerful professional learning communities in schools.

  16. Working memory capacity as controlled attention in tactical decision making.

    Science.gov (United States)

    Furley, Philip A; Memmert, Daniel

    2012-06-01

    The controlled attention theory of working memory capacity (WMC, Engle 2002) suggests that WMC represents a domain free limitation in the ability to control attention and is predictive of an individual's capability of staying focused, avoiding distraction and impulsive errors. In the present paper we test the predictive power of WMC in computer-based sport decision-making tasks. Experiment 1 demonstrated that high-WMC athletes were better able at focusing their attention on tactical decision making while blocking out irrelevant auditory distraction. Experiment 2 showed that high-WMC athletes were more successful at adapting their tactical decision making according to the situation instead of relying on prepotent inappropriate decisions. The present results provide additional but also unique support for the controlled attention theory of WMC by demonstrating that WMC is predictive of controlling attention in complex settings among different modalities and highlight the importance of working memory in tactical decision making.

  17. The Work Performed within Special Legal Labour Relations

    Directory of Open Access Journals (Sweden)

    Radu Răzvan Popescu

    2016-05-01

    Full Text Available Objectives The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Prior Work Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. Results An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contr act so different from other contracts. Value We think this article is an important step in the disclosure of the problem eraised by this types of labour performed in different legal labour relations.

  18. Alternative staffing services. Contract transcription.

    Science.gov (United States)

    Tessier, C

    1992-03-01

    Contract medical transcription services can be of great assistance in meeting the demands for transcription, without jeopardizing patient, physician, or institutional confidentiality. You simply must require the contract service to provide at least the same degree of protection and preservation of confidentiality that you should require inhouse. To achieve this you must make these requirements explicit, comprehensive, comprehensible, believable, and enforceable. Discuss the requirements with prospective contractors. Review them at least annually with existing contractors and when contracts are due for renewal. Be sure to specify the consequence of breaching confidentiality, and if there are breaches, enforce the terms of the contract. Consult your institution's legal counsel both in developing the contract and in enforcing its provisions. Take into consideration your department's and institution's policies, AHIMA's statement on confidentiality, as well as local, state, and federal laws. Above all, never lose sight of the patient. Ultimately, it is not patient information that you are obligated to protect. It is the patient.

  19. Author’s contract in the Albanian copyright law

    Directory of Open Access Journals (Sweden)

    Oltion Spiro

    2016-03-01

    Full Text Available The relation between the author and his/her artistic creation is very specific and at the same time a strong one. Such relation defies any property and affective connection that an individual may have with an object (Caron, 2011, 25. Copyright constitutes precisely the legal embodiment of the author’s intimate relationship with his/her work. Copyright is a plurality of legal provisions that belongs to the author of the work, in order to protect his/her ownership and eventually the commercial exploitation of such work. In this context, the author, through legal provisions and international conventions duly ratified by Albania, enjoys a relevant legal arsenal in order to defend his/her artistic works so that such works may have a live of its own (Vivant & Bruguière 2009, 23. One of these legal measures is the contract, which in legal doctrine is well known as the author’s contract. By means of such contract, the author has the right to distribute, reproduce, license or certify rights related to his/her artistic work. In this regard, the contract is an irreplaceable tool in the hands of the author to distribute the work and to give it an undeniable value, turning it into one of the most valuable intangible assets in civil circulation. The contract of the author, as the name indicates it, is a contract that obeys to the rules of civil law with respect to the quality of the parties, the characteristics of the object of the contract, its conclusion, the determination of remuneration and the term of duration. On the other hand, it is undeniable that the contract of the author contains rules which are not specifically contemplated by the Civil Code, such as rules relating to the form, interpretation and existence of some sui generis contracts provided in Law 9380 / 2005 “On copyright and related rights” (hereinafter referred to as “Law 9380/2005” or “Law on Copyright” as well as in the Draft Law On Authors Rights (hereinafter referred

  20. 48 CFR 252.217-7027 - Contract definitization.

    Science.gov (United States)

    2010-10-01

    ...., fixed-price or cost-and-fee) proposal and cost or pricing data supporting its proposal. (b) The schedule for definitizing this contract is as follows (insert target date for definitization of the contract... of the make-or-buy and subcontracting plans and cost or pricing data). (c) If agreement on a...

  1. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.; Vertragshandbuch Stromwirtschaft. Praxisgerechte Gestaltung und rechtssichere Anwendung

    Energy Technology Data Exchange (ETDEWEB)

    Schoene, Thomas (ed.)

    2014-07-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  2. Claims in civil engineering contracts

    CERN Document Server

    Speirs, N A

    1999-01-01

    This paper considers claims arising during civil engineering construction contracts. The meaning of the word 'claim' is considered and its possible implications for additional cost and time to completion. The conditions of the construction contract selected will influence the risk apportionment between contractor and client and the price offered by the contractor for the work. Competitive bidding constraints and profit margins in the construction industry, however, may also influence the price offered. This in turn can influence the likelihood of claims arising. The client from his point of view is concerned to complete the work within an agreed time and budget. The circumstances under which claims may arise are reviewed in relation to typical conditions of contract. These circumstances are then related to the CERN LHC civil works. Ways of avoiding claims, where this is possible, are considered. Finally, the means of evaluation of claims and their settlement are considered.

  3. Complex myograph allows the examination of complex muscle contractions for the assessment of muscle force, shortening, velocity, and work in vivo

    Directory of Open Access Journals (Sweden)

    Ruhschulte Hainer

    2008-07-01

    Full Text Available Abstract Background The devices used for in vivo examination of muscle contractions assess only pure force contractions and the so-called isokinetic contractions. In isokinetic experiments, the extremity and its muscle are artificially moved with constant velocity by the measuring device, while a tetanic contraction is induced in the muscle, either by electrical stimulation or by maximal voluntary activation. With these systems, experiments cannot be performed at pre-defined, constant muscle length, single contractions cannot be evaluated individually and the separate examination of the isometric and the isotonic components of single contractions is not possible. Methods The myograph presented in our study has two newly developed technical units, i.e. a. a counterforce unit which can load the muscle with an adjustable, but constant force and b. a length-adjusting unit which allows for both the stretching and the contraction length to be infinitely adjustable independently of one another. The two units support the examination of complex types of contraction and store the counterforce and length-adjusting settings, so that these conditions may be accurately reapplied in later sessions. Results The measurement examples presented show that the muscle can be brought to every possible pre-stretching length and that single isotonic or complex isometric-isotonic contractions may be performed at every length. The applied forces act during different phases of contraction, resulting into different pre- and after-loads that can be kept constant – uninfluenced by the contraction. Maximal values for force, shortening, velocity and work may be obtained for individual muscles. This offers the possibility to obtain information on the muscle status and to monitor its changes under non-invasive measurement conditions. Conclusion With the Complex Myograph, the whole spectrum of a muscle's mechanical characteristics may be assessed.

  4. 48 CFR 819.705 - Appeal of Contracting Officer decisions.

    Science.gov (United States)

    2010-10-01

    ... the Senior Procurement Executive (SPE) within 5 working days. The SPE shall have 15 working days to... decision. The contracting officer has 5 working days to reply to the challenge by either revising the... filed within 5 working days of receipt of the contracting officer's decision. The HCA has 5 working days...

  5. Making public-private partnerships work in Nigeria | Erumebor ...

    African Journals Online (AJOL)

    This Policy Brief delves into special cases and experiences of PPPs while reviewing critical challenges and proffering solutions to making PPPs work in Nigeria. Overall, the Brief recommends the review of the National Integrated Infrastructure Master Plan (NIIMP), enactment of PPP legislation and implementation support ...

  6. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  7. Contract Dynamics : Lessons from Empirical Analyses

    OpenAIRE

    Magali Chaudey

    2010-01-01

    Working paper GATE 2010-35; The recognition that contracts have a time dimension has given rise to a very abundant literature since the end of the 1980s. In such a dynamic context, the contract may take place over several periods and develop repeated interactions. Then, the principal topics of the analysis are commitment, reputation, memory and the renegotiation of the contract. Few papers have tried to apply the predictions of dynamic contract theory to data. The examples of applications int...

  8. Pricing structures in US coal supply contracts

    Science.gov (United States)

    Kacker, Kanishka

    The subject of my dissertation is the study of coal procurement by electric utilities in the US over 2 decades, from 1979 to 2000. Energy markets are typically characterized by severe contracting problems. Buyers and sellers therefore employ various instruments, such as contract length or complex pricing arrangements, to restrict these problems. Relationship specific investment, wherein buyers make investments specific to their suppliers, has been advanced as a prominent explanation for contractual length. Investment decisions are however endogenous in length or pricing, making causal identification of the role of investment specificity difficult. In my first chapter, I attempt a resolution. I use the 1990 Clean Air Act Amendment as an exogenous shifter of the extent of relationship specific investment. A key feature of the Amendment's design helps me define a difference-in-difference model arguably free of the endogeneity issues discussed above. I find that the plants forced into switching - Phase I plants located in the US Midwest - are more likely to choose fixed price contracts than those that were not. Further they also write contracts of shorter terms, with the reduction being approximately 30%. Considerably little is known about the performance implications of contractual choices. These form the basis for Chapter 2. Here I find prices to be lower, by between 5% to 20% of the total transaction price, but the probability of renegotiation higher, under fixed price contracts than under escalator or cost-plus contracts. Contract choices appear consistent with a trade-off between establishing incentives ex-ante and lowering negotiation costs ex-post, with relationship specific investments in particular making such a trade-off compelling. Chapter 3 considers the regulatory environment these utilities were subject to. Both incentive based regulation as well as the restructuring of electricity generation are smaller in comparison to relationship specific investment

  9. 24 CFR 983.207 - Condition of contract units.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.207... in accordance with the HQS. The PHA may not make any HAP payment to the owner for a contract unit.... Such remedies include termination of housing assistance payments, abatement or reduction of housing...

  10. Smell, Odor, and Somatic Work: Sense-Making and Sensory Management

    Science.gov (United States)

    Waskul, Dennis D.; Vannini, Phillip

    2008-01-01

    Sensation (noun) is emergent in joint acts of sensing (verb). To sense, in other words, is to make sense, and sense making entails what we call "somatic work." We investigate these dynamics in the context of olfaction, highlighting how olfaction intersects with social, cultural, and moral order--thus compelling reflexive forms of somatic…

  11. The Mediational Role of Relational Psychological Contract in Belief in a Zero-Sum Game and Work Input Attitude Dependency

    Directory of Open Access Journals (Sweden)

    Adamska Krystyna

    2015-12-01

    Full Text Available The purpose of this study was to investigate the mediational role of relational psychological contract in social beliefs and work input attitude dependency. We analyzed data taken from employees (N = 258 in four different organizations operating in the Pomeranian market.

  12. Contract & agency labour: beyond self-regulation?

    OpenAIRE

    Cotton, Elizabeth

    2010-01-01

    A paper about the regulation of contract labour. Academic and legal aspects as well as case studies of global union federation work to organise and regulate contract labour in Thailand, Pakistan, Colombia, South Korea and at international level.

  13. Fuzzy Group Decision Making Approach for Ranking Work Stations Based on Physical Pressure

    Directory of Open Access Journals (Sweden)

    Hamed Salmanzadeh

    2014-06-01

    Full Text Available This paper proposes a Fuzzy Group Decision Making approach for ranking work stations based on physical pressure. Fuzzy group decision making approach allows experts to evaluate different ergonomic factors using linguistic terms such as very high, high, medium, low, very low, rather than precise numerical values. In this way, there is no need to measure parameters and evaluation can be easily made in a group. According to ergonomics much work contents and situations, accompanied with multiple parameters and uncertainties, fuzzy group decision making is the best way to evaluate such a chameleon of concept. A case study was down to utilize the approach and illustrate its application in ergonomic assessment and ranking the work stations based on work pressure and found that this approach provides flexibility, practicality, efficiency in making decision around ergonomics areas. The normalized defuzzification numbers which are resulted from this method are compared with result of quantitative assessment of Automotive Assembly Work Sheet auto, it’s demonstrated that the proposed method result is 10% less than Automotive Assembly Work Sheet, approximately.

  14. How to make sure the logistics work well under new situation

    Institute of Scientific and Technical Information of China (English)

    Dai Shi-ming

    2014-01-01

    With the further development of economics and politics in China, each industry need to make some change and innovations, in order to catch up with the new situation. State-owned enterprises are also included. This essay wil be based on the writer's actual work : logistics management, dormitory management, fleet management. Firstly wil make brief introduction of the current working condition, point out the potential issues, then discuss and try to figure out how to solve and prevent them.

  15. Work Hours as a Moderator of the Relationship between Developmental Human Resource Management Practices and the Psychological Contract: A Multilevel Investigation

    OpenAIRE

    Håkensen, Katrine

    2014-01-01

    Purpose & background – The purpose of this study was to examine if part-time and full-time employees differ in terms of psychological contract content according to level of developmental HRM practices. The study adds to an ongoing research project Organizational antecedents of psychological contracts and work-related outcomes , run by Sabine Raeder, University of Oslo in cooperation with José María Peiró, University of Valencia, Spain. Design & methodology – A survey of 463 employees from 35...

  16. Employee decision-making about disclosure of a mental disorder at work.

    Science.gov (United States)

    Toth, Kate E; Dewa, Carolyn S

    2014-12-01

    Fear of stigma may lead employees to choose not to disclose a mental disorder in the workplace, thereby limiting help-seeking through workplace accommodation. Research suggests that various factors are considered in making decisions related to disclosure of concealable stigmatizing attributes, yet limited literature explores such decision-making in the context of mental disorder and work. The purpose of this grounded theory study was to develop a model of disclosure specific to mental health issues in a work context. In-depth interviews were conducted with 13 employees of a post-secondary educational institution in Canada. Data were analyzed according to grounded theory methods through processes of open, selective, and theoretical coding. Findings indicated that employees begin from a default position of nondisclosure that is attributable to fear of being stigmatized in the workplace as a result of the mental disorder. In order to move from the default position, employees need a reason to disclose. The decision-making process itself is a risk-benefit analysis, during which employees weigh risks and benefits within the existing context as they assess it. The model identifies that fear of stigmatization is one of the problems with disclosure at work and describes the disclosure decision-making process. Understanding of how employees make decisions about disclosure in the workplace may inform organizational policies, practices, and programs to improve the experiences of individuals diagnosed with a mental disorder at work. The findings suggest possible intervention strategies in education, policy, and culture for reducing stigma of mental disorders in the workplace.

  17. Performance contracting in central government in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2015-01-01

    ) are observed across central government agencies, when the content of the performance contracts is compared. This makes it interesting to examine how variation in the content of the performance contracts across agencies can be explained? Based on a broad theoretical framework in which variation......This paper looks into performance contracting in Danish central government. Management by Objectives and Results (MBOR) was adopted in central government in Denmark during the 1980s and early 1990s. In 1991, performance contracts between parent ministries and their agencies were introduced...... in Danish central government. Since their introduction, performance contracts have become central elements in the steering and management of agencies in central government in Denmark, and today they are nearly universally adopted in central government. In Denmark, the Ministry of Finance is responsible...

  18. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    OpenAIRE

    Karen E. C. Levy

    2017-01-01

    This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, an...

  19. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  20. Who gets fired, who gets re-hired: the role of workers' contract, age, health, work ability, performance, work satisfaction and employee investments.

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth N J; Taris, Toon W

    2015-04-01

    Many workers have been dismissed in the past few years, either becoming unemployed or finding re-employment. The current study examined whether dismissal and its follow-up for the employee (re-employment versus unemployment) could be predicted from workers' employment contract and age, and their health status, work ability, work performance, work satisfaction and employee investments at baseline. Our sample comprised a selection of participants from the Netherlands Working Conditions Survey 2010 who participated in a follow-up questionnaire in 2012 (N = 2,644). We used logistic regression analyses to test our hypotheses. Temporary employment, low health status, low work ability, poor work performance, low work satisfaction and no employee investments in terms of training predicted future dismissal. Furthermore, older workers and workers reporting decreased work performance due to impaired health at baseline had a lower chance of re-employment after being dismissed. Interestingly, after taking into account all predictors, former temporary workers without permanent employment prospects had much better chances of re-employment after their dismissal than former permanent workers. Temporary, less healthy, low work ability, poor performing, dissatisfied and "under-invested" workers are at risk for dismissal, whereas older and less healthy workers are (also) at risk for long-term unemployment after being dismissed.

  1. Housing and bed and board contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2011-01-01

    Full Text Available In this work not only legal nature of catering services is analyzed, but also legal position of parties in it. Catering contract (Housing and Bed and Board Contract is unnamed in our country and the main source of law for this contract are business practices and usage. A lot of attention is paid to this question. Lack of legal norms for this area is general characteristic for most of the tourism contracts. In this contract its title is also debatable because term 'catering services' is not usually used in practice. Although this contract is unnamed in Comparative Law ,in tourist more developed countries there are more codified business practices from this area and there is more Case Law. Having in mind development of tourist economy adequate legal conditions in tourism contract are expected.

  2. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  3. 48 CFR 970.2304-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2304-2 Contract clause. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. The contracting officer shall insert the...

  4. Does Contract Complexity Limit Opportunities? Vertical Organization and Flexibility

    NARCIS (Netherlands)

    H.P.G. Pennings (Enrico)

    2010-01-01

    textabstractThe vertical organization of production entails a range of make-or-buy decisions of intermediate goods that are influenced by the difficulty of writing contracts with a potential supplier. When contracting causes high transaction costs, a firm can decide to vertically integrate the

  5. Claims for Unabsorbed Overhead on Defense Contracts.

    Science.gov (United States)

    1985-09-01

    coat which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reimbureements , or settlements...ruled that the contractor was due some reimbursement . " - Allegheny appealed the contracting officer’s determination a second time questioning how much...amount of reimbursement . The final opinion also added the cost that was substantiated for replacement of operators and make-up pay. Therefore, the

  6. A Guide to Performance Contracting. A Presentation and Discussion of the Multiple Considerations Regarding Contracted Services in Local Education Agencies.

    Science.gov (United States)

    Adams, John W.; Kitchak, Karen H.

    This report provides a framework for evaluating the use of performance contracts. It serves as a working guide for those who are considering or are committed to performance contracts with public or private organizations. The topics cover (1) the theoretical basis and rationale of performance contracting, (2) the procurement model and the request…

  7. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  8. UNIDROITED POSITION AS A SOURCE OF CONTRACT LAW IN THE FUTURE OF INDONESIAN CONTRACT LAW AMANDEMENT

    Directory of Open Access Journals (Sweden)

    N. Ike Kusmiati

    2018-01-01

    Full Text Available [Unidroited Position As A Source Of Contract Law In The Future Of Indonesian Contract Law Amandement] Business transaction often faced the issue of ensuring that the rights and obligation are fulfilled as the agreement as agreed, especially when facing the difficulties of the rights and obligation of the parties due to different legal system between countries. Thereore, to answer the problems  the parties will seek legal sources, namely book III of the Civil Code in addition to studying and understanding the principles of internasional commercial contract law, namely UNIDROIT which contains principles that can be adopted as one of the works that seek Standarization of contract law to encourage the harmonization of commercial law international efforts to bring together different business actors between countries, so that the same legal basis is required in the coming renewal of Indonesia contract law. Keyword : Position, UNIDROIT, Law, Contract, Indonesia.

  9. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  10. 30 CFR 881.6 - Project contract.

    Science.gov (United States)

    2010-07-01

    ... contractors or suppliers for the construction, installation, services or work to be performed. (b) Project... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a...

  11. 48 CFR 1552.209-74 - Limitation of future contracting.

    Science.gov (United States)

    2010-10-01

    ... supports EPA's performance of Superfund Headquarters policy work including support for the analysis and... contracts, and Superfund Technical and Analytical support contracts. (d) To the extent that the work under... nondiscretionary technical or engineering services not specifically listed above, including laboratory analysis...

  12. Making work fit care: reconciliation strategies used by working mothers of adults with intellectual disabilities.

    Science.gov (United States)

    Chou, Yueh-Ching; Fu, Li-yeh; Chang, Heng-Hao

    2013-03-01

    This study explored the experiences of working mothers with an adult child with intellectual disabilities to understand how they reconcile paid work and care responsibilities. Fifteen working mothers in Taiwan with an adult child with intellectual disabilities were interviewed, and an interpretative phenomenological approach was adopted for data collection and analysis. All included mothers prioritized their caregiving role over paid work. The strategies used by these mothers to make paid work fit with caregiving included having strong social networks and informal support for their care work, use of formal services, personal religious beliefs and positive attitudes towards care, as well as having flexible working hours due to self-employment, good relations with employers, working positions and work locations. Formal systems, which include both welfare and labour policies, need to be responsive to and involved in supporting these working mothers, especially those who lack good personal networks. © 2012 Blackwell Publishing Ltd.

  13. Making sense of the disclosure of latent defects in financial statements and company acquisition contracts

    Directory of Open Access Journals (Sweden)

    Cornelius Killian

    2011-05-01

    Full Text Available This paper analyses the statement made by the South African Appeal Court Judge Holmes in the Phame v Paizes (1973 case and, using economic and unique South African legal principles, it examines the true legal nature of a contract to regulate company acquisitions.1 Two solutions are offered for financial managers in South Africa: (1 the contract to regulate company acquisitions is a forward contract and (2 the difficulty in identifying latent defects should not be grounds for reducing the price paid for a company or enterprise in the South African legal system.

  14. Determining the hydrodynamic indices of contractions

    International Nuclear Information System (INIS)

    Blagov, Eh.E.

    2002-01-01

    The new dependences, making it possible only by measuring the flow rate and pressure drop on the contraction device (CD) with the known geometry, including the regulatory organ, in the non-crisis mode of the turbulent flow to calculate all the hydrodynamic indices of this device, including the pressure reduction in the jet contraction, are obtained. This simplifies and accelerates the CD hydraulic tests of all types. The new methodology for determining the cavitation factual start on the CD is proposed [ru

  15. Modeling the Interest Rate Term Structure: Derivatives Contracts Dynamics and Evaluation

    Directory of Open Access Journals (Sweden)

    Pedro L. Valls Pereira

    2005-06-01

    Full Text Available This article deals with a model for the term structure of interest rates and the valuation of derivative contracts directly dependent on it. The work is of a theoretical nature and deals, exclusively, with continuous time models, making ample use of stochastic calculus results and presents original contributions that we consider relevant to the development of the fixed income market modeling. We develop a new multifactorial model of the term structure of interest rates. The model is based on the decomposition of the yield curve into the factors level, slope, curvature, and the treatment of their collective dynamics. We show that this model may be applied to serve various objectives: analysis of bond price dynamics, valuation of derivative contracts and also market risk management and formulation of operational strategies which is presented in another article.

  16. Making Team Differences Work

    Science.gov (United States)

    Strathman, Beth

    2015-01-01

    Most district and school leaders understand that recruiting group members who have differing backgrounds, perspectives, talents, and personalities makes for good decision-making. Unfortunately, simply assembling a variety of top-notch individuals does not necessarily mean their talents and perspectives will be fully considered. Beth Strathman…

  17. Clinical Decision Making of Nurses Working in Hospital Settings

    Directory of Open Access Journals (Sweden)

    Ida Torunn Bjørk

    2011-01-01

    Full Text Available This study analyzed nurses' perceptions of clinical decision making (CDM in their clinical practice and compared differences in decision making related to nurse demographic and contextual variables. A cross-sectional survey was carried out with 2095 nurses in four hospitals in Norway. A 24-item Nursing Decision Making Instrument based on cognitive continuum theory was used to explore how nurses perceived their CDM when meeting an elective patient for the first time. Data were analyzed with descriptive frequencies, t-tests, Chi-Square test, and linear regression. Nurses' decision making was categorized into analytic-systematic, intuitive-interpretive, and quasi-rational models of CDM. Most nurses reported the use of quasi-rational models during CDM thereby supporting the tenet that cognition most often includes properties of both analysis and intuition. Increased use of intuitive-interpretive models of CDM was associated with years in present job, further education, male gender, higher age, and working in predominantly surgical units.

  18. Behavioural contracting as a tool to help patients achieve better health.

    Science.gov (United States)

    Neale, A V

    1991-12-01

    Behavioural contracting is an intervention technique in which a client signs an agreement to make certain behaviour changes within a specified time, usually with explicitly defined rewards for adherence or success. Contracting is being increasingly used by health professionals to assist patients in making beneficial life style changes. This paper presents data on the outcome of behavioural contracting interventions to lower serum cholesterol and to increase exercise activity. Of 223 primary care patients enrolled in a health promotion programme, 179 met with the project health educator to improve their cardiovascular risk profile; 144 of these were classified as having 'high cholesterol' and 51 signed contracts to adopt the American Heart Association guidelines diet within a 3-month period. Everyone was encouraged to sign a contract to engage in aerobic exercise three times per week; 96 did so. The results indicate that contractors achieved greater beneficial health changes than non-contractors, and that the group which fully met their contract obligations experienced the greatest health benefit of all (either a lowering of cholesterol or a decreased exercising heart rate).

  19. When I'm 64: Psychological contract breach, work motivation and the moderating roles of future time perspective and regulatory focus

    NARCIS (Netherlands)

    Lange, A.H. de; Bal, P.M.; Heijden, B.I.J.M. van der; Jong, N. de; Schaufeli, W.B.

    2011-01-01

    There is an increasing need for managers to understand what motivates younger versus older workers to continue work within their company. We believe that this two-wave study among 90 Dutch employees is the first to examine: (1) the cross-lagged relationships between breach of psychological contract

  20. When I'm 64 : Psychological contract breach, work motivation and the moderating roles of future time perspective and regulatory focus

    NARCIS (Netherlands)

    de Lange, Annet H.; Bal, P. Matthijs; Van der Heijden, Beatrice I. J. M.; de Jong, Nicole; Schaufeli, Wilmar B.

    2011-01-01

    There is an increasing need for managers to understand what motivates younger versus older workers to continue work within their company. We believe that this two-wave study among 90 Dutch employees is the first to examine: (1) the cross-lagged relationships between breach of psychological contract

  1. CONTRACT FARMING PRACTICE IN INDIAN PUNJAB: FARMERS’ PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    Nivedita Sharma

    2014-01-01

    Full Text Available This paper examines the status quo of contract farming in Indian Punjab from the farmers‟ perspective. The analysis is based on the field survey of three districts of the state covering 300 contract farmers. It is observed that agribusiness normalization has taken hold of the CF practice and farmers are facing its brunt. Withdrawal of extension services, reneging on prices and procurement are the major issues afflicting CF. Lack of adjudication is making contract farming exploitative in approach and the study recommends vigilant and strong intervention of the government.

  2. New Perils for the Contract Ethnographer.

    Science.gov (United States)

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  3. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  4. Essence of Time in Construction Contracts

    Directory of Open Access Journals (Sweden)

    Tony Lim

    2012-11-01

    Full Text Available The building industry has in recent years seen huge costs incurreddue to disputes arising on notice requirement clauses. Theseclaims could have been averted if the parties had been diligent inproviding the necessary notices. This article sets out to explorethe law briefl y as interpreted by the courts in common law andequity and discuss the possibility of defence under the principle ofpromissory estoppel. More importantly it also shares the author’sview on how such pitfalls could have been prevented by givingthe proper notices within the timeline required by the contractconditions. It cannot be emphasised enough that contractorswould be wise to comply strictly with the notice provisions in thecontract instead of relying on the estoppel principle or waiver orunconscionability to save their day. Notice clauses essentiallyrequire a competent contracts administrator to follow the time lineprovided in the contract conditions and would be most effective ifthe project team worked closely with the contracts administratorto ensure that proper notices are given when directions orinstructions are received. Although it is common to see noticeclauses which make it a condition precedent for a contractor to beentitled to claim for an extension of time or loss and expense claimbeing interpreted restrictively, in any litigation or arbitration it isalways diffi cult to predict how the courts or tribunal would be willingto uphold such notice clause. It is therefore in the interest of theparties that notice clauses should be properly observed. Suffi ceto say, failure to comply with a notice clause and time bar may befatal to a claim.

  5. Art. 70-71: Incorporation and making available of standard contract terms

    NARCIS (Netherlands)

    Loos, M.; Colombi Ciacchi, A.

    2016-01-01

    Incorporation of standard terms is a much-debated issue in almost all legal systems. Any legal instrument on contract law therefore must provide an answer as to when terms are incorporated – but answers may vary considerably from one legal system to the next. In this chapter the provisions of the –

  6. Contract engineers cut costs, and flexibility

    International Nuclear Information System (INIS)

    Bhargava, V.M.

    1991-01-01

    Today's rapid expansion of technology is an important reason for considering hiring contract engineering labor for your power plant because technical specialization is an important aspect of the contract engineering industry. This paper reports that another reason is addressing peak work loads. Any amount of technical assistance is available to assist in meeting schedules. Although a typical human resources department of a utility or architect/engineer may contain a few hundred active resumes, a contract engineering firm may have upwards of 40,000 resumes on file from all parts of the country. Because contract workers know that contract agencies keep abreast of client needs, they are more apt to forward updated resumes to such agencies. Used properly, a contract engineering company's services will augment the efforts of a human resources group and, in the case of some smaller companies, actually take the place of all internal recruiting efforts

  7. The coordinating contracts of supply chain in a fuzzy decision environment.

    Science.gov (United States)

    Sang, Shengju

    2016-01-01

    The rapid change of the product life cycle is making the parameters of the supply chain models more and more uncertain. Therefore, we consider the coordination mechanisms between one manufacturer and one retailer in a fuzzy decision marking environment, where the parameters of the models can be forecasted and expressed as the triangular fuzzy variables. The centralized decision-making system, two types of supply chain contracts, namely, the revenue sharing contract and the return contract are proposed. To obtain their optimal policies, the fuzzy set theory is adopted to solve these fuzzy models. Finally, three numerical examples are provided to analyze the impacts of the fuzziness of the market demand, retail price and salvage value of the product on the optimal solutions in two contracts. It shows that in order to obtain more fuzzy expected profits the retailer and the manufacturer should seek as low fuzziness of demand, high fuzziness of the retail price and the salvage value as possible in both contracts.

  8. Comparing Different European Income Tax Policies Making Work Pay

    NARCIS (Netherlands)

    R.H.J.M. Gradus (Raymond); J.M. Julsing

    2003-01-01

    textabstractRaising the participation at the lower end of the labour market abstract is hindered by the high burden of taxation. Therefore, recently, in some European countries serious efforts have been made to make work pay. In this paper an overview of these current efforts is given. With the

  9. Making Work-Based Learning Work

    Science.gov (United States)

    Cahill, Charlotte

    2016-01-01

    Americans seeking employment often face a conundrum: relevant work experience is a prerequisite for many jobs, but it is difficult to gain the required experience without being in the workplace. Work-based learning--activities that occur in workplaces through which youth and adults gain the knowledge, skills, and experience needed for entry or…

  10. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  11. 48 CFR 36.517 - Layout of work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Layout of work. 36.517... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.517 Layout of work. The contracting officer shall insert the clause at 52.236-17, Layout of Work, in solicitations and contracts when...

  12. Common Elements for Success: What Makes the Deal Work at Contaminated Sites

    Science.gov (United States)

    This page contains the presentations from the Brown to Green: Make the Connection to Renewable Energy workshop held in Santa Fe, New Mexico, during December 10-11, 2008 regarding Common Elements for Success - What makes the Deal Work at Contaminated Sites.

  13. RENEGOTIATION MINING CONTRACT: LEGAL PARADIGM RECONSTRUCTION EFFORTS

    Directory of Open Access Journals (Sweden)

    Marilang -

    2014-07-01

    Full Text Available Renegotiation contract mining is not a priori notion that was born but is driven by the fact that empirical Work Contract (KK and coal mining concessions of the Works Agreement (Cca that are valid for this resulted in profits which are not comparable between countries with investors (domestic and foreign. In addition, Law No. 4 of 2009 about Mineral and Coal Mining (minerba through article 169 have been injected that though the mining contracts during the validity of this, still respected until the end, however, if the implementation of these contracts give rise to distortions for the national interest, then the Government must encourage the investors to do Renegotiation against existing contracts to comply with legislation minerba forever within a period of one year since the enactment of the legislation this minerba. Renegotiation mining contracts that have been approved on the fact of the matter is simply an attempt to reconstruct the ruling paradigm, so with that paradigm shift, both parties can reach the intersection for the benefit of both parties, i.e. the parties proportionately Indonesia suffered no losses on the one hand, and the benefit of the domestic and foreign investors remain in reasonable limits on the other. 

  14. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  15. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  16. Computerized system of team make-up and work allocation in the Belgian Zolder mine

    Energy Technology Data Exchange (ETDEWEB)

    Rustanowicz, M.

    1979-01-01

    System of work allocation introduced in 1974 in the Zolder Coal Mine (NV Kempense Steenkolenmijnen) in Belgium is evaluated. The system is based on an IBM 370/158 computer. An information management system supervises the programing work. There are approximately 30 programs. Absenteeism in the Belgian coal mines is generally high at approximately 24% and some months as high as 40%. Therefore, introducing a computerized system of work allocation and team make-up was advantageous. Operation of the system is described on the levels of foreman, engineers and director of the mine. Advantages of the system are numerous. It enables optimization of team make-up and work allocation, shortens the time of allocation of work by a foreman, increases efficiency of foremen's work and provides the director with the means and information necessary for efficient decision making in improving the productivity of the mine. (5 refs.) (In Polish)

  17. Intrinsic Factors Influencing Decision making of Arbitrators in Dispute Resolution of variation Claims

    Science.gov (United States)

    Iyer, K. C.; Chaphalkar, N. B.; Patil, Smita K.

    2018-06-01

    Occurrence of disputes is a common feature in construction contracts. Adjudication of disputes through the arbitration process involves detailed and through analysis of facts and evidences related to the case before arriving at the final decision. These facts and evidences have been explored by researchers to develop dispute resolution mechanisms. As a part of the research, the present work identifies the factors which influence the decision making of arbitrators in resolving disputes through a case study of 72 arbitration awards and settled court cases related to Indian construction contracts. This work further seeks consensus for the identified factors from experts and also ranks the factors based on their importance with the help of the responses obtained through a questionnaire survey and statistical tests.

  18. Tackling online inequality: Making digital platforms work for inclusive ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Tackling online inequality: Making digital platforms work for inclusive development. As they become an essential part of the digital experience, online platforms such as Facebook, Amazon, Uber, AirBnB, and Twitter are having a direct bearing on social inclusion and opportunity in many spheres of life for people around the ...

  19. Informal contracting between and within firms

    Directory of Open Access Journals (Sweden)

    Ricard Gil

    Full Text Available Abstract While informal contracts are widely used in modern economies, limited systematic empirical evidence is available to researchers and policy makers. This paper aims to fill the gap by discussing a selected sample of empirical works through the lens of a theoretical framework that clarifies the role of informal contracts. We also highlight unexplored research opportunities offered by more recent theoretical models that investigate how informal contracts are built over time, how they are subject to path dependency, and how relational rents are created, and are awaiting empirical analysis.

  20. Consistency Checking of Web Service Contracts

    DEFF Research Database (Denmark)

    Cambronero, M. Emilia; Okika, Joseph C.; Ravn, Anders Peter

    2008-01-01

    Behavioural properties are analyzed for web service contracts formulated in Business Process Execution Language (BPEL) and Choreography Description Language (CDL). The key result reported is an automated technique to check consistency between protocol aspects of the contracts. The contracts...... are abstracted to (timed) automata and from there a simulation is set up, which is checked using automated tools for analyzing networks of finite state processes. Here we use the Concurrency Work Bench. The proposed techniques are illustrated with a case study that include otherwise difficult to analyze fault...

  1. 48 CFR 9.507-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.507-2 Contract clause. (a) If..., for example, when the first production contract using the contractor's specifications or work statement is awarded, or it might extend through the entire life of a system for which the contractor has...

  2. Nonstandard Work, Substandard Jobs. Flexible Work Arrangements in the U.S.

    Science.gov (United States)

    Kalleberg, Arne L.; Rasell, Edith; Cassirer, Naomi; Reskin, Barbara F.; Hudson, Ken; Webster, David; Appelbaum, Eileen; Spalter-Roth, Roberta M.

    Nonstandard work arrangements (independent contracting, working for a temporary help agency, contract or on-call work, day labor, self-employment, and regular part-time employment) are growing more common in the United States. In 1995, more than 29 percent of all jobs were in nonstandard work arrangements. A study of these jobs and the…

  3. Galilean contractions of W-algebras

    Directory of Open Access Journals (Sweden)

    Jørgen Rasmussen

    2017-09-01

    Full Text Available Infinite-dimensional Galilean conformal algebras can be constructed by contracting pairs of symmetry algebras in conformal field theory, such as W-algebras. Known examples include contractions of pairs of the Virasoro algebra, its N=1 superconformal extension, or the W3 algebra. Here, we introduce a contraction prescription of the corresponding operator-product algebras, or equivalently, a prescription for contracting tensor products of vertex algebras. With this, we work out the Galilean conformal algebras arising from contractions of N=2 and N=4 superconformal algebras as well as of the W-algebras W(2,4, W(2,6, W4, and W5. The latter results provide evidence for the existence of a whole new class of W-algebras which we call Galilean W-algebras. We also apply the contraction prescription to affine Lie algebras and find that the ensuing Galilean affine algebras admit a Sugawara construction. The corresponding central charge is level-independent and given by twice the dimension of the underlying finite-dimensional Lie algebra. Finally, applications of our results to the characterisation of structure constants in W-algebras are proposed.

  4. Positive and negative implications entailed by fixed-term employment contracts

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2018-03-01

    Full Text Available Generally, fixed-term employment contracts are seen as a stepping stone to permanent employment; they have become popular among the flexible forms of work contracts, and are the object of an increasing number of debates and assessments, investigating both the respective legislation and the specific consequences on the parties concluding a fixed-term employment contract. Despite the positive aspects of temporary employment – a positive effect on the rate of employment, and the common perception of such contracts as a preliminary step to permanent employment, as well as the flexibility they bring to the labor market – one cannot ignore the negative implications of fixed-term contracts on the nature of the employment relationship, the system of social protection, the working conditions, the economic security, and the job stability. Based on these considerations, the present paper investigates the advantages and disadvantages of the individual fixed-term employment contract from the standpoints of both employers and employees. Obviously, this approach aims to explore the usefulness and importance of these contract types, as means for balancing the needs of employers and employees on the labor market, and for identifying concrete instances that justify the liberalization of fixed-term employment, despite all the inherent risks entailed by any type of non-standard work: lack of job security; reduced social protection and security for those concluding such a contract.

  5. Recognition For Index Option Contracts U nder IAS 39 And IFRS 9 – The Case Of Option Contracts Bound To BIST 30 Index

    Directory of Open Access Journals (Sweden)

    Nevran Karaca

    2014-09-01

    Full Text Available There is a limited number of academic studies about accoun ting for derivative products but non of them relating to the accounting for index option contracts. Within the scope of the study, it is aimed to indicate accounting regulations and procedures to be followed under IAS 39 and IFRS 9 for option contracts whi ch traded in Futures and Options Exchange. The BIST 30 index option contracts having the highest volume of transaction and traded in VIOP is the main subject of the study via this objective. It is aimed to make the issue explicit by the help of a fictional ized example about these contracts.

  6. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  7. Anatomy of a cogeneration deal : natural gas contracts and regulatory issues

    International Nuclear Information System (INIS)

    Brett, J.T.

    1999-01-01

    The special features of gas contracts for cogeneration projects were discussed. It was recommended that a gas power purchase contract should be entered early in a project development cycle to justify requests for new pipeline facilities. Issues regarding buyer's commitments, market prices, and volumes were also discussed. In the event of failure to deliver, the contract should include provisions which would make it possible to source gas elsewhere, terminate the contract or seek damages. This paper also discussed various pricing provisions in a gas commodity contract, security of supplies, gas transportation arrangements, regulatory considerations, outstanding issues, and IMO (independent market operator) requirements

  8. Under-Optimized Smart Contracts Devour Your Money

    OpenAIRE

    Chen, Ting; Li, Xiaoqi; Luo, Xiapu; Zhang, Xiaosong

    2017-01-01

    Smart contracts are full-fledged programs that run on blockchains (e.g., Ethereum, one of the most popular blockchains). In Ethereum, gas (in Ether, a cryptographic currency like Bitcoin) is the execution fee compensating the computing resources of miners for running smart contracts. However, we find that under-optimized smart contracts cost more gas than necessary, and therefore the creators or users will be overcharged. In this work, we conduct the first investigation on Solidity, the recom...

  9. The application of a selection of decision-making techniques by employees in a transport work environment in conjunction with their perceived decision-making success and practice

    Directory of Open Access Journals (Sweden)

    Theuns F.J. Oosthuizen

    2014-03-01

    Full Text Available A lack of optimum selection and application of decision-making techniques, in conjunction with suitable decision-making practice and perception of employees in a transport work environment demands attention to improve overall performance. Although multiple decision-making techniques exist, five prevalent techniques were considered in this article, namely the Kepner-Tregoe, Delphi, stepladder, nominal group and brainstorming techniques. A descriptive research design was followed, using an empirical survey which was conducted among 210 workers employed in a transport work environment and studying in the field of transport management. The purpose was to establish to what extent the five decision-making techniques are used in their work environment and furthermore how the decision-making practice of using gut-feel and/or a step-by-step decision-making process and their perception of their decision-making success relate. The research confirmed that the use of decision-making techniques is correlated to perceived decision-making success. Furthermore, the Kepner-Tregoe, stepladder, Delphi and brainstorming techniques are associated with a step-by-step decision-making process. No significant association was confirmed between the use of gut-feel and decision-making techniques. Brainstorming was found to be the technique most frequently used by transport employees; however, it has limitations as a comprehensive decision-making technique. Employees working in a transport work environment need training in order to select and use the four comprehensive decision-making techniques.

  10. 48 CFR 227.7103-6 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... software or computer software documentation (see 227.72), commercial items (see 227.7102-3), existing works...-engineer and construction contracts. (b)(1) Use the clause at 252.227-7013 with its Alternate I in research... Software Previously Delivered to the Government, in solicitations when the resulting contract will require...

  11. Making advanced analytics work for you.

    Science.gov (United States)

    Barton, Dominic; Court, David

    2012-10-01

    Senior leaders who write off the move toward big data as a lot of big talk are making, well, a big mistake. So argue McKinsey's Barton and Court, who worked with dozens of companies to figure out how to translate advanced analytics into nuts-and-bolts practices that affect daily operations on the front lines. The authors offer a useful guide for leaders and managers who want to take a deliberative approach to big data-but who also want to get started now. First, companies must identify the right data for their business, seek to acquire the information creatively from diverse sources, and secure the necessary IT support. Second, they need to build analytics models that are tightly focused on improving performance, making the models only as complex as business goals demand. Third, and most important, companies must transform their capabilities and culture so that the analytical results can be implemented from the C-suite to the front lines. That means developing simple tools that everyone in the organization can understand and teaching people why the data really matter. Embracing big data is as much about changing mind-sets as it is about crunching numbers. Executed with the right care and flexibility, this cultural shift could have payoffs that are, well, bigger than you expect.

  12. 48 CFR 536.570-5 - Working hours.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Working hours. 536.570-5... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-5 Working hours. Insert 552.236-74, Working Hours, in solicitations and contracts if construction, dismantling...

  13. 29 CFR 778.407 - The nature of the section 7(f) contract.

    Science.gov (United States)

    2010-07-01

    ... it is not in written form. Furthermore, the contract must be “bona fide.” This implies that both the making of the contract and the settlement of its terms were done in good faith. ... 29 Labor 3 2010-07-01 2010-07-01 false The nature of the section 7(f) contract. 778.407 Section...

  14. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Science.gov (United States)

    2012-12-06

    ..., to implement VA's authority under the Act to enter into provider agreements and contracts to pay for... these veterans using either contracts or provider agreements. Because the Act makes no further.... Paragraph (b) of revised Sec. 51.41 discusses contracts. The Act requires that rates of payments be ``based...

  15. Who influences white working-class boys’ higher education decision-making process? the role of social networks

    OpenAIRE

    McLellan, Ruth

    2013-01-01

    The study illuminates the influence of social networks on the HE decision-making process of white working-class boys. The impact of gender, race and social class social characteristics on white working-class boys HE decision-making is assessed. In addition, how white working-class boys define and discuss the membership of their social network, together with the phenomenon of social network influence on white working-class boys’ decision-making about HE at Key Stage 4.The expansive literature ...

  16. Contract farming in Costa Rica: opportunities for smallholders?

    OpenAIRE

    Sáenz-Segura, J.F.

    2006-01-01

    Transaction costs and other market failures are widely present in the agricultural sector of emerging economies and negatively affect to low-income smallholders, making difficult their integration into dynamic agri-food supply chains. Earlier literature mentions contract farming as an economic institution with the potential to incorporate smallholders into more advanced markets and strength supply chain integration. However, the application of contract farming in some countries of Latin Ameri...

  17. An event-based model for contracts

    Directory of Open Access Journals (Sweden)

    Tiziana Cimoli

    2013-02-01

    Full Text Available We introduce a basic model for contracts. Our model extends event structures with a new relation, which faithfully captures the circular dependencies among contract clauses. We establish whether an agreement exists which respects all the contracts at hand (i.e. all the dependencies can be resolved, and we detect the obligations of each participant. The main technical contribution is a correspondence between our model and a fragment of the contract logic PCL. More precisely, we show that the reachable events are exactly those which correspond to provable atoms in the logic. Despite of this strong correspondence, our model improves previous work on PCL by exhibiting a finer-grained notion of culpability, which takes into account the legitimate orderings of events.

  18. Working Memory and Decision-Making in a Frontoparietal Circuit Model.

    Science.gov (United States)

    Murray, John D; Jaramillo, Jorge; Wang, Xiao-Jing

    2017-12-13

    Working memory (WM) and decision-making (DM) are fundamental cognitive functions involving a distributed interacting network of brain areas, with the posterior parietal cortex (PPC) and prefrontal cortex (PFC) at the core. However, the shared and distinct roles of these areas and the nature of their coordination in cognitive function remain poorly understood. Biophysically based computational models of cortical circuits have provided insights into the mechanisms supporting these functions, yet they have primarily focused on the local microcircuit level, raising questions about the principles for distributed cognitive computation in multiregional networks. To examine these issues, we developed a distributed circuit model of two reciprocally interacting modules representing PPC and PFC circuits. The circuit architecture includes hierarchical differences in local recurrent structure and implements reciprocal long-range projections. This parsimonious model captures a range of behavioral and neuronal features of frontoparietal circuits across multiple WM and DM paradigms. In the context of WM, both areas exhibit persistent activity, but, in response to intervening distractors, PPC transiently encodes distractors while PFC filters distractors and supports WM robustness. With regard to DM, the PPC module generates graded representations of accumulated evidence supporting target selection, while the PFC module generates more categorical responses related to action or choice. These findings suggest computational principles for distributed, hierarchical processing in cortex during cognitive function and provide a framework for extension to multiregional models. SIGNIFICANCE STATEMENT Working memory and decision-making are fundamental "building blocks" of cognition, and deficits in these functions are associated with neuropsychiatric disorders such as schizophrenia. These cognitive functions engage distributed networks with prefrontal cortex (PFC) and posterior parietal

  19. Choosing Whether to Buy or Make : The Contracting Out of Employment Reintegration Services by Dutch Municipalities

    NARCIS (Netherlands)

    Plantinga, Mirjam; de Ridder, Ko; Corra, Alex

    The Western welfare states are under reform. An important part of these reforms is the introduction of market type mechanisms for the deliverance of public services. Over the years, many countries have chosen to contract out employment reintegration services. The underlying notion of contracting out

  20. 48 CFR 3009.171-3 - Determination of eligibility for award of FPS guard service contracts.

    Science.gov (United States)

    2010-10-01

    ... eligibility for award of FPS guard service contracts. 3009.171-3 Section 3009.171-3 Federal Acquisition... eligibility for award of FPS guard service contracts. (a) Contracting officers shall make a determination of eligibility for award of FPS guard service contracts upon identification of the apparent successful offeror as...

  1. Making 'what works' work

    DEFF Research Database (Denmark)

    Plum, Maja

    2017-01-01

    and a mattress. As such, the paper shows how DR, as an evidence-based method, is established through concrete relations, rather than abstracted and universal principals. It argues that these relations stabilising DR are never enacted once and for all, but require continual work to be held together as a method...... that ‘works’....

  2. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  3. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  4. Social contract and social integration in adolescent development.

    Science.gov (United States)

    Hilles, W S; Kahle, L R

    1985-10-01

    Eighty-nine subjects from two high schools were tested during the spring of their sophomore and senior years, when their mean ages were 16 years, 1 month, and 18 years, 1 month, respectively. Composites measured social contract with: (a) independence, (b) implicit social contract, societal norms and expectations, and (c) explicit social contracts, rules. Composites and single items measured social integration with: (d) role commitment, (e) social-American Dream, accepting the belief in the American Dream that hard work would lead to social success, (f) self-American Dream, belief that hard work will produce personal satisfaction and success, (g) raw deal, perceptions of being treated unfairly, (h) self-blame, and (i) feelings of hopelessness. The results of the cross-lagged panel correlations generally support the hypothesis that students respond to implicit social contracts through role commitment, which is further expressed by a belief in the American Dream for social fulfillment, while responding to the perception of explicit social contracts by not believing in the benefits of the American Dream for personal fulfillment. These results were interpreted as supporting Dienstbier's theory of moral development.

  5. 78 FR 7858 - Publication of Fiscal Year 2012 Service Contract Inventory

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF THE TREASURY Publication of Fiscal Year 2012 Service Contract Inventory AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2012 Service Contract Inventory. SUMMARY: The Department of the Treasury will make available to the public at http://www.treasury.gov/about...

  6. Contract Req Detailed Design Report Version 1: A C-BASS Component Contract Req Detailed Design Report Version 1: A C-BASS Component

    National Research Council Canada - National Science Library

    McGurin, Denis

    1999-01-01

    .... As part of the Corporate Business Application Software System (C-BASS) suite of work flow applications, Contract Req automates preparation of a requestor's procurement package as part of the contracting process for the U.S...

  7. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    Directory of Open Access Journals (Sweden)

    Jesper Rohr Hansen

    2013-05-01

    Full Text Available This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings, and to make them more energy efficient. At the moment 30 municipalities (of the 98 municipalities in Denmark are involved in, or preparing, ESCO contracts. Nevertheless, ESCO-contracting still faces many challenges on the Danish market, as there is a widespread skepticism towards the concept amongst many stakeholders. The purpose of this paper is to discuss the various experience gained so far by municipalities use of ESCO-contracting, the different approached to ESCO-contracting being used in practice, as well as the different viewpoints drivers and barriers behind the development. The strong growth in ESCO-contracts reflects that the ESCO-concept fits well with a number of present problems that municipalities are facing, as well as a flexible adaptation to the local context in different municipalities.

  8. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  9. Performance-Driven Interface Contract Enforcement for Scientific Components

    Energy Technology Data Exchange (ETDEWEB)

    Dahlgren, Tamara Lynn [Univ. of California, Davis, CA (United States)

    2008-01-01

    Performance-driven interface contract enforcement research aims to improve the quality of programs built from plug-and-play scientific components. Interface contracts make the obligations on the caller and all implementations of the specified methods explicit. Runtime contract enforcement is a well-known technique for enhancing testing and debugging. However, checking all of the associated constraints during deployment is generally considered too costly from a performance stand point. Previous solutions enforced subsets of constraints without explicit consideration of their performance implications. Hence, this research measures the impacts of different interface contract sampling strategies and compares results with new techniques driven by execution time estimates. Results from three studies indicate automatically adjusting the level of checking based on performance constraints improves the likelihood of detecting contract violations under certain circumstances. Specifically, performance-driven enforcement is better suited to programs exercising constraints whose costs are at most moderately expensive relative to normal program execution.

  10. Implementing a Rule-Based Contract Compliance Checker

    Science.gov (United States)

    Strano, Massimo; Molina-Jimenez, Carlos; Shrivastava, Santosh

    The paper describes the design and implementation of an independent, third party contract monitoring service called Contract Compliance Checker (CCC). The CCC is provided with the specification of the contract in force, and is capable of observing and logging the relevant business-to-business (B2B) interaction events, in order to determine whether the actions of the business partners are consistent with the contract. A contract specification language called EROP (for Events, Rights, Obligations and Prohibitions) for the CCC has been developed based on business rules, that provides constructs to specify what rights, obligation and prohibitions become active and inactive after the occurrence of events related to the execution of business operations. The system has been designed to work with B2B industry standards such as ebXML and RosettaNet.

  11. The Public Schools Contracts Law. Focus on School Law Series.

    Science.gov (United States)

    Dabreu, O. Lisa

    New Jersey's Public Schools Contracts Law, enacted on June 2, 1977, places limits on the authority of local and regional boards of education to make purchases and to enter into contracts, agreements, or leases for supplies or services. This publication is designed to provide information and guidance that will assist boards of education in meeting…

  12. Heat contracting - a contribution to climate protection, security of supply and competition; Waerme-Contracting - ein Beitrag zu Klimaschutz, Versorgungssicherheit und Wettbewerb

    Energy Technology Data Exchange (ETDEWEB)

    Quint, R.P. [GASAG WaermeService GmbH, Berlin (Germany)

    2007-08-15

    Contracting is an important trump card when it comes to containing the climate change and improving the security of supply - and a promising business field besides. This is an option that should be used more widely considering the ambitious energy efficiency improvement targets of the European Union and Germany, which are set at 20% and 50% percent over the year 1990, respectively. It is moreover an option that pays off. German tenancy law is in urgent need of a reform to make heat contracting more popular. Furthermore, the modernisation of heating systems through contracting should be placed on a level with modernisation effected by the landlord.

  13. Building electro-optical systems making it all work

    CERN Document Server

    Hobbs, Philip C D

    2009-01-01

    Praise for the First Edition ""Now a new laboratory bible for optics researchers has joined the list: it is Phil Hobbs's Building Electro-Optical Systems: Making It All Work.""-Tony Siegman, Optics & Photonics News Building a modern electro-optical instrument may be the most interdisciplinary job in all of engineering. Be it a DVD player or a laboratory one-off, it involves physics, electrical engineering, optical engineering, and computer science interacting in complex ways. This book will help all kinds of technical people sort through the complexit

  14. Army Contracting Command Workforce Model Analysis

    Science.gov (United States)

    2012-02-09

    Empresas in Madrid. His Air Force contracting experience includes F-22 Fighter, C-17 Cargo Transport , and a contingency deployment as director of Joint...and the University of Maryland (University College). He has also conducted visiting seminars at American University in Cairo and Instituto de ...the long total process times that are sometimes involved in weapon system contracting, such an assessment may equate to a de facto future work

  15. ON PRICE-MAKING CONTRACTS AND ECONOMIC THEORY: RETHINKING BERTRAND AND EDGEWORTH

    OpenAIRE

    Robert R. Routledge

    2012-01-01

    A problematic issue in economic theory is the study of price determination. Two distinct approaches to this difficult topic have been taken: (i) in Bertrand competition it is assumed sellers enter the market with a commitment to supply all demand forthcoming from buyers (ii) in Edgeworth competition sellers quote prices with no commitment to supply more than their competitive supply. Both these types of market contract struggle to provide credible pricemaking foundations for perfect competiti...

  16. Choreographies and Behavioural Contracts on the Way to Dynamic Updates

    Directory of Open Access Journals (Sweden)

    Mario Bravetti

    2014-11-01

    Full Text Available We survey our work on choreographies and behavioural contracts in multiparty interactions. In particular theories of behavioural contracts are presented which enable reasoning about correct service composition (contract compliance and service substitutability (contract refinement preorder under different assumptions concerning service communication: synchronous address or name based communication with patient non-preemptable or impatient invocations, or asynchronous communication. Correspondingly relations between behavioural contracts and choreographic descriptions are considered, where a contract for each communicating party is, e.g., derived by projection. The considered relations are induced as the maximal preoders which preserve contract compliance and global traces: we show maximality to hold (permitting services to be discovered/substituted independently for each party when contract refinement preorders with all the above asymmetric communication means are considered and, instead, not to hold if the standard symmetric CCS/pi-calculus communication is considered (or when directly relating choreographies to behavioral contracts via a preorder, no matter the communication mean. The obtained maximal preorders are then characterized in terms of a new form of testing, called compliance testing, where not only tests must succeed but also the system under test (thus relating to controllability theory, and compared with classical preorders such as may/must testing, trace inclusion, etc. Finally, recent work about adaptable choreographies and behavioural contracts is presented, where the theory above is extended to update mechanisms allowing choreographies/contracts to be modified at run-time by internal (self-adaptation or external intervention.

  17. 25 CFR 900.128 - What funding shall the Secretary provide in a construction contract?

    Science.gov (United States)

    2010-04-01

    ... Indian tribe or tribal organization of performing the contract, taking into consideration the terms of the contract and the requirements of the Act and any other applicable law; (b) The costs of preparing... contractor that carries out the construction contract to make a reasonable profit, taking into consideration...

  18. Jazzing up the Psychological Contract

    Science.gov (United States)

    Hartley, Nell Tabor

    2010-01-01

    Helping students and practitioners to understand and utilize the Psychological Contract is often a difficult task. Unlike fault-finding research, this paper presents the PC as a positive, vibrant and valuable tool. In an effort to make the concept less elusive, the paper draws upon the metaphor of jazz. The metaphor is an accepted tool of…

  19. Weak contractions via $\\lambda$-sequences

    OpenAIRE

    Agyingi, Collins Amburo; Gaba, Yaé Ulrich

    2018-01-01

    In this note, we discuss common fixed point for a family of self mapping defined on a metric type space and satisfying a weakly contractive condition. In our development, we make use of the $\\lambda$-sequence approach and also of a certain class of real valued maps. We derive some implications for self-mappings on quasi-pseudometric type spaces.

  20. Psychological contracts of hospice nurses.

    Science.gov (United States)

    Jones, Audrey Elizabeth; Sambrook, Sally

    2010-12-01

    Psychological contracts have been described as individuals' beliefs regarding the obligations, expectations, and contributions that exist between them and their employer. They can be influenced by the organization's culture and philosophy, through human resources policies, and through the employee's personality and characteristics. Owing to the recent economic crisis, hospices in the UK are currently in a transitional phase and are being expected to demonstrate efficiencies that might be more in line with a business model than a health-care environment. This may conflict with the philosophical views of hospice nurses. To support nurses through this transition, it might be helpful to understand the antecedents of hospice nurses' behaviour and how they construct their psychological contracts. Failure to offer adequate support might lead to negative outcomes such as a desire to leave the organisation, poorer quality work, or disruptive behaviour. This study used a modified grounded theory approach involving in-depth interviews to explore the context and content of the psychological contracts of hospice nurses in the UK. Four main themes emerged: the types of psychological contracts formed, how the contracts are formed, their contents, and the breaches and potential violations the nurses perceive.

  1. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  2. Career Stage and Generational Differences in Psychological Contracts

    Science.gov (United States)

    Hess, Narelle; Jepsen, Denise M.

    2009-01-01

    Purpose: The purpose of this paper is to determine how employees in different generational groups (or cohorts) and different career stages perceive their psychological contracts. Design/methodology/approach: A survey of 345 working adults included psychological contract obligations, incentives and importance and the cognitive responses of job…

  3. Lessons learned by (from?) an economist working in medical decision making.

    Science.gov (United States)

    Wakker, Peter P

    2008-01-01

    This article is a personal account of the author's experiences as an economist working in medical decision making. He discusses the differences between economic decision theory and medical decision making and gives examples of the mutual benefits resulting from interactions. In particular, he discusses the pros and cons of different methods for measuring quality of life (or, as economists would call it, utility), including the standard gamble, the time tradeoff, and the healthy-years equivalent methods.

  4. Making Agrifood Systems Work for the Rural Poor in Eastern and ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Making Agrifood Systems Work for the Rural Poor in Eastern and Southern Africa ... areas rely on a range of indigenous or underutilized crops for food, nutrition and income security. ... Advocates Coalition for Development and Environment.

  5. Defense Contracting: Use of Undefinitized Contract Actions Understand and Definitization Time Frames Often Not Met

    National Research Council Canada - National Science Library

    2007-01-01

    ...), which authorize contractors to begin work before reaching a final agreement on contract terms. The contractor has little incentive to control costs during this period, creating a potential for wasted taxpayer dollars...

  6. The role of the psychological contract in the motivation of nurses.

    Science.gov (United States)

    Corder, Emma; Ronnie, Linda

    2018-02-05

    Purpose Although private health care is regarded as providing a premium quality experience for both patients and staff alike, it is not without its daily challenges for health professionals. This study aims to explore the psychological contract of nurses to develop a greater understanding of how employee-employer interaction impacts motivation levels. Design/methodology/approach Data were gathered through semi-structured interviews with thirteen nurses at a private hospital in South Africa. Five nursing managers were interviewed to provide a management perspective. Thematic analysis was used to identify the salient elements of the psychological contract and to establish connections with motivational features. Findings The psychological contract of nurses was balanced in nature, contained predominantly relational elements and was characterized by the need for manager support, leadership and autonomy. Motivation was a by-product of fulfilment and was enhanced by a combination of tangible and intangible rewards. Practical implications Nursing managers should recognize their role in caring for the wellbeing of their staff and should be trained accordingly. Equipping nurses with the necessary tools to work autonomously, as well as acknowledging their skills, will stimulate confidence and improve motivation. Originality/value This study makes an important contribution to the existing literature on the psychological contract of nurses within the health-care system. It provides insight into relationship-based mechanisms that can be used to improve the motivation of nurses and thus impact the overall quality of patient care.

  7. Making Ends Meet: Insufficiency and Work-Family Coordination in the New Economy

    Science.gov (United States)

    Edgell, Penny; Ammons, Samantha K.; Dahlin, Eric C.

    2012-01-01

    The "New Economy" features 24/7 employment, varied work schedules, job insecurity, and lower benefits and wages, which lead to disparities in experiences of security and sufficiency. This study investigates sufficiency concerns in the New Economy; who is having trouble making ends meet? Sufficiency concerns are subjective perceptions that work is…

  8. Proposal for the award of an industrial services contract for electrical installation work and maintenance of lighting and low-voltage distribution

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for electrical installation work and maintenance of lighting and low-voltage distribution. Following a market survey carried out among 127 firms in fifteen Member States, a call for tenders (IT-2754/ST) was sent on 2 June 2000 to three firms and four consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received tenders from two firms and two consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE TRINDEL(FR) ? CONTROLMATIC (DE), the lowest bidder complying with the specified requirements, for an initial period of three years from 1 July 2001 for a total amount of 41 705 497 Swiss francs, not subject to revision until 31 December 2003. The contract will include options for two one-year extensions beyond the initial three-year period for a total amount of 27 803 664 Swiss francs, for which CERN will seek approval by the Finance ...

  9. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  10. The Effects of Age, Priming, and Working Memory on Decision-Making.

    Science.gov (United States)

    Wood, Meagan; Black, Sheila; Gilpin, Ansley

    2016-01-11

    In the current study, we examined the effects of priming and personality on risky decision-making while playing the Game of Dice Task (GDT). In the GDT, participants decide how risky they wish to be on each trial. In this particular study prior to playing the GDT, participants were randomly assigned to one of three priming conditions: Risk-Aversive, Risk-Seeking, or Control. In the Risk-Seeking condition, a fictional character benefitted from risky behavior while in the Risk-Aversive condition, a fictional character benefitted from exercising caution. Although not explicitly stated in the instructions, participants need to make "safe" rather than risky choices to optimize performance on the GDT. Participants were also given Daneman and Carpenter's assessment of working memory task. Interestingly, although older adults self-reported being more cautious than younger adults on the Domain Specific Risk Attitude scale (DOSPERT), older adults made riskier decisions than younger adults on the GDT. However, after controlling for working memory, the age differences on the GDT became insignificant, indicating that working memory mediated the relation between age and risky decisions on the GDT.

  11. Can Dentistry Have Two Contracts with the Public?

    Science.gov (United States)

    Nash, David A

    2015-01-01

    The social contract is an implicit agreement between parts of society and society as a whole. Since the Middle Ages, the learned professions, recently including dentistry, have had a covenantal relationship with the public based on trust, exchanging monopoly privileges for benefiting the public good. Unlike commercial trade in commodities, professional relationships are grounded in ensuring an adequate level of oral health to all. A second contract is emerging where dentists relate to society as business operators, exchanging commodity services for a price. Recent actions by the Federal Trade Commission and the U.S. Supreme Court make it unlikely that dentistry will be able to enjoy only selected aspects of each contract while avoiding obligations that it finds unfavorable.

  12. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  13. 42 CFR 51.21 - Contracts for program operations.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contracts for program operations. 51.21 Section 51... APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Program Administration and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work...

  14. On description of contracts and agreements in the context of SOA

    Directory of Open Access Journals (Sweden)

    Laima Paliulionienė

    2013-09-01

    Full Text Available The issue of making contracts between services in Service-Oriented Architecture (SOA arises naturally, because in real life services are subjects for negotiation and contracting. The notion of contract in SOA is rather misleading, because usually means just technical specification – input and output parameters, pre- and postconditions. However, there are also other aspects of contract. Service Level Agreements (SLAs often are used together with technical contract. SLAs describes the level of service expected by a customer from a supplier, laying out the metrics by which that service is measured, the remedies or penalties in case the agreed-upon levels are not achieved. The paper aim to clear up the notions of contract and agreement in SOA, discusses the properties of languages that are used to specify contacts and agreements, paying special attention to their legal aspects and comparing contract features in WS-Agreement ir WSLA.

  15. Natural gas contracts in efficient portfolios

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1994-12-01

    This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

  16. Making muscle elastic: the structural basis of myomesin stretching.

    Directory of Open Access Journals (Sweden)

    Larissa Tskhovrebova

    2012-02-01

    Full Text Available Skeletal and cardiac muscles are remarkable biological machines that support and move our bodies and power the rhythmic work of our lungs and hearts. As well as producing active contractile force, muscles are also passively elastic, which is essential to their performance. The origins of both active contractile and passive elastic forces can be traced to the individual proteins that make up the highly ordered structure of muscle. In this Primer, we describe the organization of sarcomeres--the structural units that produce contraction--and the nature of the proteins that make muscle elastic. In particular, we focus on an elastic protein called myomesin, whose novel modular architecture helps explain elasticity.

  17. The quality of life of single mothers making the transition from welfare to work.

    Science.gov (United States)

    Cook, Kay; Davis, Elise; Smyth, Paul; McKenzie, Hayley

    2009-09-01

    This study examined the quality of life of single mothers making the mandatory transition from welfare to work. The Australian government purported that the benefits of making this transition would include higher incomes, better social participation, and improved wellbeing. It is currently unknown, however, how single mothers currently engaged in welfare to work programs evaluate their quality of life. Quality of life scores for 334 single mothers engaged in welfare to work in Australia were compared with normative data. Participants reported significantly lower quality of life scores than the general population for all quality of life domains, highlighting the need to carefully examine welfare to work policies to ensure they promote participants' quality of life.

  18. An Optional Instrument for European Insurance Contract Law

    OpenAIRE

    Mandeep Lakhan; Helmut Heiss

    2010-01-01

    The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law) network, drafting a specific part of the Common Fr...

  19. Contract-oriented software development for internet services

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Ravn, Anders Peter

    2008-01-01

    COSoDIS (Contract-Oriented Software Development for Internet Services) develops novel approaches to implement and reason about contracts in service oriented architectures (SOA). The rationale is that system developers benefit from abstraction mechanisms to work with these architectures. Therefore...... the goal is to design and test system modeling and programming language tools to empower SOA developers to deploy highly dynamic, negotiable and monitorable Internet services....

  20. Efficient Structure-Based Models for the McKibben Contraction Pneumatic Muscle Actuator: The Full Description of the Behaviour of the Contraction PMA

    Directory of Open Access Journals (Sweden)

    Alaa Al-Ibadi

    2017-10-01

    Full Text Available To clarify the advantages of using soft robots in all aspects of life, the effective behaviour of the pneumatic muscle actuator (PMA must be known. In this work, the performances of the PMA are explained and modelled with three formulas. The first formula describes the pulling force of the actuator based on the structure parameters; furthermore, the formula presented is the generalised contraction force for wholly-pneumatic muscle actuators. The second important model is the length formula, which is modified to our previous work to fit different actuator structures. Based on these two models, the stiffness of the actuator is formulated to illustrate its variability at different air pressure amounts. In addition, these formulas will make the selection of proper actuators for any robot arm structure easier using the knowledge gained from their performance. On the other hand, the desired behaviour of this type of actuator will be predefined and controlled.

  1. Final Report for Contract No. MDA903-85-C-0472

    National Research Council Canada - National Science Library

    Lewman, T

    2002-01-01

    .... Work was performed on site at ARI Presidio of Monterey (ARI-POM). This document, the final report for the contract, describes the results achieved during the contract, and provides a list of the products delivered...

  2. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  3. Using Comics to Communicate Legal Contract Cancellation

    Directory of Open Access Journals (Sweden)

    Marietjie Botes

    2017-10-01

    Full Text Available This article investigates how comics can be used to adequately communicate the correct process of contract cancellation and whether comics can enhance understanding of the legal process. A survey of pre-owned vehicle buyers of various levels of education in Pretoria, South Africa found that when comics are used to communicate contract cancellation, a significant increase in the comprehension of the legal cancellation process occurs. The results may influence how contracting parties may choose to communicate complex legal issues in future, specifically to consumers with little formal education or when parties are confronted with severe language barriers, which is highly relevant in a country such as South Africa with eleven official languages and generally low levels of education. The article argues that representatives tasked with explaining contractual content to contracting parties should consider making use of comics to aid them in their communication process to ensure proper understanding and execution of terms and conditions, which in turn may lead to fewer disputes and avoid expensive litigation.

  4. The Effects of Age, Priming, and Working Memory on Decision-Making

    Directory of Open Access Journals (Sweden)

    Meagan Wood

    2016-01-01

    Full Text Available In the current study, we examined the effects of priming and personality on risky decision-making while playing the Game of Dice Task (GDT. In the GDT, participants decide how risky they wish to be on each trial. In this particular study prior to playing the GDT, participants were randomly assigned to one of three priming conditions: Risk-Aversive, Risk-Seeking, or Control. In the Risk-Seeking condition, a fictional character benefitted from risky behavior while in the Risk-Aversive condition, a fictional character benefitted from exercising caution. Although not explicitly stated in the instructions, participants need to make “safe” rather than risky choices to optimize performance on the GDT. Participants were also given Daneman and Carpenter’s assessment of working memory task. Interestingly, although older adults self-reported being more cautious than younger adults on the Domain Specific Risk Attitude scale (DOSPERT, older adults made riskier decisions than younger adults on the GDT. However, after controlling for working memory, the age differences on the GDT became insignificant, indicating that working memory mediated the relation between age and risky decisions on the GDT.

  5. The Importance of Employment Contract for Umsida Quality Employees Improvement

    Directory of Open Access Journals (Sweden)

    Noor Fatimah Mediawati

    2015-12-01

    Full Text Available The absence of employment contracts in UMSIDA recognized cause some problems. Especially in improving the performance of employees. Issues a little more disturbing harmonious labor relations between employees and UMSIDA. In the terminology of the Labour Act, employment contract terms it is known as the Employment Agreement. Where the existence of labor agreement / contract employment is expected to harmonize the working relationship with the employer in accordance with the applicable rules. The existence of employment contracts is also a legal instrument which according to researchers ought to be put forward in efforts to increase the qualifications and competence of employees. By contract it will also avoid things that are not desirable in an employment relationship, because each party will always carry out their rights and responsibilities are aligned and balanced. Tranquility in the work and the guarantee of legal protection are expected to improve employee performance especially towards quality UMSIDA 2020. So this study explored further the urgency employment contract once its design. How To Cite: Mediawati, N., & Phahlevy, R. (2015. The Importance of Employment Contract for Umsida Quality Employees Improvement. Rechtsidee, 2(2, 141-156. doi:http://dx.doi.org/10.21070/jihr.v2i2.106

  6. The values underlying team decision-making in work rehabilitation for musculoskeletal disorders.

    Science.gov (United States)

    Loisel, Patrick; Falardeau, Marlène; Baril, Raymond; José-Durand, Marie; Langley, Ann; Sauvé, Sandrine; Gervais, Julie

    2005-05-20

    This paper presents the results of a qualitative study on the values underlying the decision-making process of an interdisciplinary team working in a work rehabilitation facility of a Québec teaching hospital. In order to document the values underlying the decision-making process, a single case observational study was conducted. Interdisciplinary team weekly discussions on ongoing cases of 22 workers absent from work due to musculoskeletal disorders were videotaped. All discourses were transcribed and analyzed following an inductive and iterative approach. The values identified were validated by feedback from team members. Ten common decision values emerged from the data: (1) team unity and credibility, (2) collaboration with stakeholders, (3) worker's internal motivation, (4) worker's adherence to the program, (5) worker's reactivation, (6) single message, (7) reassurance, (8) graded intervention, (9) pain management and (10) return to work as a therapy. The analysis of these values led to the design of a model describing interrelations between them. This study throws light on some mechanisms underlying the decisions made by the team and determining its action. This improves understanding of the actions taken by an interdisciplinary team in work rehabilitation and may facilitate knowledge transfer in the training of other teams.

  7. Foxconned Labour as the Dark Side of the Information Age: Working Conditions at Apple’s Contract Manufacturers in China.

    Directory of Open Access Journals (Sweden)

    Marisol Sandoval

    2013-07-01

    Full Text Available Apple is one of the most dominant and most admired computer companies in the world. But hidden behind the clean surface of Apple’s advanced gadgets lies a dirty world of work. This paper focuses on the dark side of the information age by looking at working conditions in the workshops of Apple’s contract manufacturers in China. For this purpose I suggest a systematic model of working conditions that can be used for assessing and comparing work in different industries. Departing from Karl Marx’s circuit of capital it identifies elements that shape working conditions throughout the capital accumulation process including productive forces, relations of production, the production process, products, and labour legislation. Subsequently I apply this model to the realm of electronics manufacturing. Based on research conducted by corporate watchdogs this paper provides detailed insights into the work and life reality of workers in Apple’s first tier supplier factories. An analysis of Apple’s response to labour rights allegations furthermore reveals three ideological patterns that rather obscure existing problems than offering viable solutions.

  8. Virtual Team Work : Group Decision Making in 3D Virtual Environments

    NARCIS (Netherlands)

    Schouten, A.P.; van den Hooff, B.; Feldberg, F.

    2016-01-01

    This study investigates how three-dimensional virtual environments (3DVEs) support shared understanding and group decision making. Based on media synchronicity theory, we pose that the shared environment and avatar-based interaction allowed by 3DVEs aid convergence processes in teams working on a

  9. Virtual Team Work : Group Decision Making in 3D Virtual Environments

    NARCIS (Netherlands)

    Schouten, Alexander P.; van den Hooff, Bart; Feldberg, Frans

    This study investigates how three-dimensional virtual environments (3DVEs) support shared understanding and group decision making. Based on media synchronicity theory, we pose that the shared environment and avatar-based interaction allowed by 3DVEs aid convergence processes in teams working on a

  10. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  11. Russian Contract Law for Foreigners

    Directory of Open Access Journals (Sweden)

    Andrey Shirvindt

    2015-01-01

    Full Text Available The book by Maria Efremova, Svetlana Yakovleva and Jane Henderson aims to serve as a short introduction to Russian contract law for a foreign lawyer. Assuming that the target readership are mainly English lawyers the book’s second aim, expressly stated by the authors (pp. i, 1, is to make lawyers from common law countries familiar with codified law, with Russian law being just an example. The book covers most of the general law of obligations as well as some questions of formation and invalidity of contracts that belong to the general part of the Civil Сode, with this preceded by a brief introduction into the Russian law dealing with its history, federal structure and state agencies of Russia, its court system, sources of law and legal profession.

  12. 48 CFR 47.205 - Availability of term contracts and basic ordering agreements for transportation or for...

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION Contracts for Transportation or for Transportation-Related Services 47.205 Availability of term... is generally more economical and efficient for most agencies to make use of term contracts and basic... on behalf of other activities and agencies. For instance, GSA awards term contracts for services such...

  13. Lack of symmetry in employees' perceptions of the psychological contract.

    Science.gov (United States)

    Jepsen, Denise M; Rodwell, John J

    2012-06-01

    Despite debate on the nature of employees' perceptions of their psychological contract, little research has compared employees' and employers' sides of the psychological contract. All 80 items from both scales in the Psychological Contract Inventory were used in a survey of 436 currently working, non-student respondents. Structural equation modeling yielded nonsymmetrical perspectives on promises and obligations, highlighting the validity of approaching the issues via individual perceptions.

  14. Comment: Risk Allocation Norms of Civil Construction Contracts in ...

    African Journals Online (AJOL)

    This comment discusses risk allocation under Ethiopian construction law and examines risks in civil construction contracts. The comment highlights the gaps in risk allocation norms under the standard format of construction contract that was issued by the Ethiopian Ministry of Work and Urban Development (MoWUD) in 1994 ...

  15. 29 CFR 785.4 - Application to Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Application to Walsh-Healey Public Contracts Act. 785.4... Considerations § 785.4 Application to Walsh-Healey Public Contracts Act. The principles set forth in this part... employees performing work subject to the provisions of the Walsh-Healey Public Contracts Act. [35 FR 15289...

  16. Why do Participation in Decision Making Enhance Creativity in Work Groups?

    DEFF Research Database (Denmark)

    Christensen, Bo Thomas; Jønsson, Thomas

    It seems to be an established fact in the organizational psychological literature that participation in decision making leads to creativity and innovation in work groups and organizations. A quite extensive amount of research has claimed that the link exists, although only a somewhat smaller amount...... of research has established that there is a link between the two constructs of participation in decision making and creativity. But although this link has been clearly documented theories with clearly stated causal explanations of why participation in decision making (pdm) would lead to creativity...... factors include such different models as enhanced intrinsic motivation (Amabile, 2001; Conti & Amabile, 1999), reduction in resistance to change (De Dreu & West, 2001), pooling of unshared knowledge (Latham, Winters, & Locke, 1994) and better utilization of individual differences in cognitive style...

  17. Why does Participation in Decision Making Enhance Creativity in Work Groups?

    DEFF Research Database (Denmark)

    Christensen, Bo T.; Jønsson, Thomas S.

    It seems to be an established fact in the organizational psychological literature that participation in decision making leads to creativity and innovation in work groups and organizations. A quite extensive amount of research has claimed that the link exists, although only a somewhat smaller amount...... of research has established that there is a link between the two constructs of participation in decision making and creativity. But although this link has been clearly documented theories with clearly stated causal explanations of why participation in decision making (pdm) would lead to creativity...... factors include such different models as enhanced intrinsic motivation (Amabile, 2001; Conti & Amabile, 1999), reduction in resistance to change (De Dreu & West, 2001), pooling of unshared knowledge (Latham, Winters, & Locke, 1994) and better utilization of individual differences in cognitive style...

  18. Forestry contracting in South Africa

    CSIR Research Space (South Africa)

    Khosa, M

    2000-01-01

    Full Text Available of their workers directly to a contractor system. For example, forest contractors are now hired to carry out planting, tending and silvicultural operations. Sappi Forests, Mondi Forests and Safcol are all contracting certain work out and are currently assisting...

  19. Psychological contracts: a new strategy for retaining reduced-hour physicians.

    Science.gov (United States)

    Hartwell, Jennifer K

    2010-01-01

    As a retention strategy, healthcare organizations offer reduced-hour schedules to physicians seeking better work-family balance. However, this quantitative study of 94 full-time and reduced-hour female physicians in the Boston area found that working fewer hours helps physicians achieve better balance but does not improve their burnout or career satisfaction, or impact their intention to quit or leave the field of medicine. Instead, the findings demonstrate that psychological contract fulfillment, which reflects the subjective nature of the employment relationship, is more important than work hours, an objective job condition, in predicting intention to quit and these other outcomes. A fine-grained analysis is initiated uncovering the multidimensionality of the psychological contract construct. To integrate successful reduced-hour arrangements for physicians, medical managers are directed to the importance of understanding the composition of reduced-hour physicians' psychological contracts, specifically, their need to do challenging work, receive high levels of supervisor support, and promotion opportunities.

  20. Contract farming in Costa Rica: opportunities for smallholders?

    NARCIS (Netherlands)

    Sáenz-Segura, J.F.

    2006-01-01

    Transaction costs and other market failures are widely present in the agricultural sector of emerging economies and negatively affect to low-income smallholders, making difficult their integration into dynamic agri-food supply chains. Earlier literature mentions contract farming as an economic

  1. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  2. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  3. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  4. 48 CFR 32.405 - Applying Pub. L. 85-804 to advance payments under sealed bid contracts.

    Science.gov (United States)

    2010-10-01

    ... advance payments under sealed bid contracts. 32.405 Section 32.405 Federal Acquisition Regulations System... Non-Commercial Items 32.405 Applying Pub. L. 85-804 to advance payments under sealed bid contracts. (a... provisions of law relating to contracts, as explained in 50.101-1(a), also include making advance payments...

  5. A New Approach Regarding the Legal Contract Lesion

    Directory of Open Access Journals (Sweden)

    Sache Neculaescu

    2010-06-01

    Full Text Available Why not agreeing upon a contract based on misbalanced services: because the party benefiting from an excessive service unlawfully exploited the precarious situation of the other party as a result of whom came to accept an unfair contract, or because contractual balance must be an essential feature of which and every contract with clearly established services? Which of the two reasons mentioned above is more important in terms of current contractual discipline? These are two questions which, no matter what answers will get, will involve an important matter of choice, in relation to which it will be possible to assess correctly the solutions proposed by the new Romanian Civil Code, as well as by the main bills on Europeancodification of contract law. The present study upholds the idea of misbalanced services only if it constitutes rather a remedy for a contractual problem, if it is oriented towards the legitimate interests of the most vulnerable party of that contract and less interested in sanctioning the guilty conduct of the person who tookadvantage from an excessive service. As a consequence, we support the objective perspective in what misbalanced services are concerned, a reason for which we shall be making a few comments on some of thenew legal provisions, by referring to the main bills on the European codification of contract law, and stating later on a few de lege ferenda proposals, in terms of contracts based on misbalanced services.

  6. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  7. Water and Muscle Contraction

    Directory of Open Access Journals (Sweden)

    Enrico Grazi

    2008-08-01

    Full Text Available The interaction between water and the protein of the contractile machinery as well as the tendency of these proteins to form geometrically ordered structures provide a link between water and muscle contraction. Protein osmotic pressure is strictly related to the chemical potential of the contractile proteins, to the stiffness of muscle structures and to the viscosity of the sliding of the thin over the thick filaments. Muscle power output and the steady rate of contraction are linked by modulating a single parameter, a viscosity coefficient. Muscle operation is characterized by working strokes of much shorter length and much quicker than in the classical model. As a consequence the force delivered and the stiffness attained by attached cross-bridges is much larger than usually believed.

  8. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  9. HOMEWORKING CONTRACT AND TELEWORKING - IMPORTANCE AND ROLE IN THE ECONOMY

    Directory of Open Access Journals (Sweden)

    OANA-CARMEN RĂVAŞ

    2013-12-01

    Full Text Available Work at home leads to greater stability of the community, because changing jobs often lead to a change of life and inherent stress. Employers who choose to work at home do not have the problem of providing housing for service or cost they incurred directly or indirectly or through the gaining that lucrative acquire more space in the office or in premises whose owner is or the fact that there office rents. The individual contract of working at home is an individual employment contract named special character, with the main feature that "work place" is not located in the unit, the employer, but the employee's residence.

  10. Pooling knowledge and improving safety for contracted works at a large industrial park.

    Science.gov (United States)

    Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo

    2015-01-01

    At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.

  11. Collective contract in thermal equipment mounting process at the Balakovo NPP

    International Nuclear Information System (INIS)

    Shpol, E.A.; Goryashchenko, Yu.N.

    1986-01-01

    Experience of collective contract introduction into thermal equipment mounting process at the Balakovo NPP is briefly described.4627 thousand roubles are utilized and 45.6% of annual volume of works are made using the collective contract method in 1984 during reactor room construction at the Balakovo-1 NPP. Cost of works are reduced by 137.8 thousand roubles. The conclusion is made that the formation of large teams ( 45-70 men ) promotes labour productivity increase as well as high quality of works

  12. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  13. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  14. Key Considerations for Using No-Harm Contracts with Clients Who Self-Injure

    Science.gov (United States)

    Hyldahl, Rebecca S.; Richardson, Brent

    2011-01-01

    One of the more controversial issues in working with people who self-injure is whether counselors should use no-harm contracts. Important therapeutic considerations include the efficacy of such contracts or agreements in preventing self-injury, the emotional and behavioral responses of clients, and the perceived protection these contracts or…

  15. Muscle involvement during intermittent contraction patterns with different target force feedback modes

    DEFF Research Database (Denmark)

    Sjøgaard, G; Jørgensen, L V; Ekner, D

    2000-01-01

    and following 30 min of intermittent contractions showed larger fatigue development with proprioceptive feedback than visual feedback. Also rating of perceived exertion increased more during proprioceptive feedback than visual feedback. This may in part be explained by small differences in the mechanics during......: Feedback mode significantly effects the muscle involvement and fatigue during intermittent contractions. RelevanceIntermittent contractions are common in many work places and various feedback modes are being given regarding work requirements. The choice of feedback may significantly affect the muscle load...... and consequently the development muscle fatigue and disorders....

  16. New version of the “Working on the CERN site” document

    CERN Multimedia

    ProLiQS (Procurement Lifecycle Quality Subcommittee)

    2016-01-01

    CERN engages numerous contractors to carry out work on the CERN site. These outside companies must acquaint themselves with CERN’s complex and specific statutory context, which governs various aspects of their work from the bid until the end of the work on site and at every stage of the execution of the contract in between. A new version of the document that outlines the rules and conditions is now available.   In order to help contractors and the technical managers of contracts at CERN, a general document entitled “Working on the CERN site” (“Prestations sur le site du CERN” in French) was produced in the early 2010s. The goal was to make bidders and contractors aware of all the rules to which they are subject. A new version of this document is now at https://edms.cern.ch/ui/file/1155899/LAST_RELEASED/*.pdf The revision of the document essentially involved updating and clarifying many of its provisions, in particular those relating to safet...

  17. Chronic work stress and decreased vagal tone impairs decision making and reaction time in jockeys.

    Science.gov (United States)

    Landolt, Kathleen; Maruff, Paul; Horan, Ben; Kingsley, Michael; Kinsella, Glynda; O'Halloran, Paul D; Hale, Matthew W; Wright, Bradley J

    2017-10-01

    The inverse relationship between acute stress and decision-making is well documented, but few studies have investigated the impact of chronic stress. Jockeys work exhaustive schedules and have extremely dangerous occupations, with safe performance requiring quick reaction time and accurate decision-making. We used the effort reward imbalance (ERI) occupational stress model to assess the relationship of work stress with indices of stress physiology and decision-making and reaction time. Jockeys (N=32) completed computerised cognitive tasks (Cogstate) on two occasions; September and November (naturally occurring lower and higher stress periods), either side of an acute stress test. Higher ERI was correlated with the cortisol awakening responses (high stress r=-0.37; low stress r=0.36), and with decrements in decision-making comparable to having a blood alcohol concentration of 0.08 in the high stress period (pdecision-making. Potentially, this may be attributed to a 'tipping point' whereby the higher ERI reported by jockeys in the high stress period decreases vagal tone, which may contribute to reduced decision-making abilities. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  19. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  20. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  1. 77 FR 67584 - Air Carrier Contract Maintenance Requirements

    Science.gov (United States)

    2012-11-13

    ... many, including air carriers lowering costs by employing fewer maintenance personnel and reducing their... make accurate risk assessments. B. History In May 1996, employees of SabreTech, a contract maintenance...-certificated repair facilities, and the air carriers' outsourcing of maintenance. In each of those reports...

  2. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  3. Making mediation work.

    Science.gov (United States)

    Arif, Zeba

    2016-10-26

    Mediation can be an effective way of solving conflict between staff members. It signifies a willingness for people to work together to discuss their differences in a constructive way, before going down the official grievance route.

  4. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Science.gov (United States)

    2010-04-01

    ..., taking into consideration the terms of the contract and the requirements of the Act and any other applicable law; (2) The costs of preparing the contract proposal and supporting cost data; (3) The costs... construction contract to make a reasonable profit, taking into consideration the risks associated with carrying...

  5. [Psychological contract in the light of flexible employment: The review of studies].

    Science.gov (United States)

    Żołnierczyk-Zreda, Dorota

    Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  6. Making the audit work for you

    International Nuclear Information System (INIS)

    Wilczynski, E.J.

    1991-10-01

    These slides presented at an Environmental Auditing Conference, focus on one aspect of environmental auditing: its important role in the even broader practice of Environmental Management. The use of audits by the Department of Energy will be examined within the context of sound environmental management to illustrate the delicate practice of ''Making the Audit Work for You.'' A summary of the main points to be covered follows. (1) Brief description of DOE Environmental Audit process; disciplines covered, DOE Orders reviewed, management/operations evaluated. (2) Brief discussion of DOE/Secretary Watkin's Tiger Team initiative as the cornerstone of his plan to strengthen the Department's Environment, Safety, and Health (ESH) programs. (3) Examples given of the types of findings presented in each of these areas, along with brief examples of root causes, lessons learned, trends, and noteworthy practices. (4) Discussion of the relationships between environmental audits, safety and health assessments, and management and organization assessments. (5) Discussion of Environmental Auditing/Assessment and its recurring role in the Environmental Management continuum. (6) DOE is cited as an example of an organization that uses audits as a powerful environmental management tool to help achieve its objectives and multiple goals

  7. To tender, re-negotiate or partner: Strategies for contracting service companies

    International Nuclear Information System (INIS)

    Gouldie, T.A.

    1994-01-01

    The contracting of oilfield service companies by petroleum exploration and production operating companies is different than the contracting of civil engineering, construction or other project-oriented contractors. The relationship between operating companies and oilfield service companies has had a long and unique history which has evolved since the first oil wells were drilled over a century ago. The process of contracting service companies by operating companies for petroleum exploration and production work can be split into three distinct stages: (1) decide what it is that should be contracted out and what should be kept in house; (2) determine the method to use to select the contractor(s) to perform the work; and (3) agree to the contractual structure to best reflect the relationship the operating company and the service company with to initiate and maintain. As there are ongoing changes to the business structures and corporate thinking of both operating and service companies, there are also evolving changes to what are considered core businesses and the methods of selecting and contracting service companies by operating companies. Operating companies are recognizing the high costs of tendering for contractor services in terms of personnel time and administrative effort, and are relying more on negotiating and rolling-over existing contracts with their suitable, capable contractors. Partnering, in its many forms and levels, is increasingly being recognized as a useful method to get better work done at cheaper overall costs

  8. Features of the Market Achievement Plan (MAPII) contracts

    International Nuclear Information System (INIS)

    Roberts, B.

    2002-01-01

    This PowerPoint presentation described the MAPII products and contract characteristics with reference to aggregator role, location and system development. Work underway by the Balancing Pool for Alberta's Electricity Consumers was highlighted. It was demonstrated that 'all-in' costs of PPAs exceed market prices. Charts depicting both unit and strip contract interfaces were included. It was noted that the sale of a strip contract requires an aggregator whose function will essentially replace the interface between power pool participants and the power pool. Strip contract buyers will interface with the aggregator. The aggregator will have no discretion in managing offers. The three options for aggregator location are for the aggregator to be part of the balancing pool, attached to the power pool, or as an independent agent. 2 figs

  9. Values underlying perceptions of breach of the psychological contract

    Directory of Open Access Journals (Sweden)

    Leon Botha

    2010-10-01

    Research purpose: The study identifies the most important breaches and investigates which values underlie employee perceptions of breach of the psychological contract. It also addresses values that lead to employees interpreting incidents as breaches. Motivation for the study: The study calls on the fact that employees make inconsequential contributions to the terms of many formal employment contracts may imply that such contracts cannot be viewed as documents between equals. Research design, approach and method: The study identifies the most prominent breaches of the psychological contract and the values underlying the perceptions that violations have occurred. Main findings: The data revealed lack of promotion, poor interpersonal relations between colleagues and bad treatment by seniors as three main breaches of the contract, and social recognition, world of peace and sense of accomplishment as three dominant values that underlie perceptions of contract violation. Practical/managerial implications: The competent and intelligent manner in which lack of promotion is handled and communicated to employees is vital because it has implications for their willingness to contribute, their career prospects and their intention to stay in the organisation. Contribution/value-add: This research can serve as the basis for the development of survey or research instruments that are appropriate and relevant to the population.

  10. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  11. Make-or-buy decisions and the manipulability of performance measures

    OpenAIRE

    Andersson, Fredrik

    2009-01-01

    Abstract in Undetermined The make-or-buy decision is analyzed in a simple framework combining contractual incompleteness with the existence of an imperfect but contractible performance measure. Contractual incompleteness gives rise to two regimes, identified with make and buy. The performance measure on which comprehensive contracts can be written is imperfect in the sense of being subject to manipulation. The performance incentives faced by the agent are stronger in the “buy” regime. A posit...

  12. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  13. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  14. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  15. The psychological contracts of National Health Service nurses.

    Science.gov (United States)

    Purvis, Lynne J; Cropley, Mark

    2003-03-01

    Following the psychological contract model of the employee-employer exchange relationship is offered as a means of understanding the expectations of a UK sample of 223 National Health Service (NHS) nurses in association with their leaving intentions. A pilot study involving 21 NHS nurses, using the repertory grid technique was conducted to elicit contract expectations. Twenty-nine categories of expectation were identified through content analysis. The study proper, employed a survey developed on the basis of results from the pilot study to identify contract profiles among 223 nurses from three London/South-east NHS hospitals, using the Q-sort method. Type of contract held (relational/transactional), satisfaction (job and organization), and leaving intentions were also examined. Q-analysis yielded four contract profiles among the nurses sampled: 'self-development and achievement'; 'belonging and development'; 'competence and collegiality' and 'autonomy and development'. Correlation analysis demonstrated that leaving intentions were associated with a need for personal autonomy and development, and the violation of expectations for being appreciated, valued, recognized and rewarded for effort, loyalty, hard-work and achievement, negative endorsement of a relational contract, positive endorsement of a transactional contract, and job and organizational dissatisfaction. Findings illustrate the diagnostic utility of the term psychological contract for understanding the expectations of NHS nurses. The potential significance of these findings for managing nurse retention is highlighted.

  16. Is contracting out good or bad for employees?

    DEFF Research Database (Denmark)

    Vrangbæk, Karsten; Petersen, Ole Helby; Hjelmar, Ulf

    2015-01-01

    in the working conditions and work environment for the personnel in public organizations. In this article, we present the findings from a systematic review of studies documenting the consequences of contracting out for employees. The review is based on 26 empirical studies published between 2000 and 2012. We...... find both positive and negative effects for employees documented in the literature, although with a predominance of negative effects, including reductions in the workforce and other changes in the workforce composition such as the replacement of experienced employees with younger workers, poorer...... working conditions, lower salaries, fewer benefits, and reduced job satisfaction. We conclude that poorer conditions for the public service personnel are well documented as a short-term consequence of contracting out, while more studies covering a longer time-span are needed to assess whether...

  17. Considerations Relating to the Jurisdiction of the Arbitration Litigation on Solving Public Acquisition Contracts

    Directory of Open Access Journals (Sweden)

    Gina Livioara Goga

    2016-05-01

    Full Text Available The current legislation on public procurement, namely Government Emergency Ordinance no. 34/2006 on the public procurement contracts, public works concession contracts and service concession, currently governs the arbitration institution, having the possibility of settling any disputes regarding the execution of contracts. We consider that the contested provisions infringe the principle of predictability, as they are not clear because of the regulation of the two articles, and thus the analysis of the entire chapter entitled “Solving complaints” (Chapter IX of the G.E.O. 34/2006 in conjunction with the title order or with the purpose and principles of the adoption of G.E.O. 34/2006, it appears that it refers only to the procedure for settling disputes arising in attributing public procurement contracts, concession contracts for public works service concession contracts.

  18. "I Can Only Work So Hard Before I Burn Out." A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout.

    Science.gov (United States)

    Jones, Samantha K; Griep, Yannick

    2018-01-01

    Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee's well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this "double edged" role of meaningful work by drawing from ideological psychological contracts (iPCs), which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential "dark side" of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees' reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes.

  19. Contracts Take or Pay, for supply and transport of gas

    International Nuclear Information System (INIS)

    Velasquez Bermudez, Jesus Maria

    2000-01-01

    The present article has as objective to study the effect that has the contract of supply and of transport of gas that subscribe generators agents of the electric sector with the agents of the market of the gas. The article concentrates on the study of the denominated contracts take or pay. Initially the modeling is analyzed to include the effect of the contracts of gas in the mathematical models that are used to support the works of planning. Later on is studied of optimal form to determining the prices in spot markets of the industries associated to the contracts. Finally is presented the methodology and controlled experiments that allow to identify and to quantify the macro economic effect of the contracts

  20. Working memory deficits affect risky decision-making in methamphetamine users with attention-deficit/hyperactivity disorder.

    Science.gov (United States)

    Duarte, Nichole A; Woods, Steven Paul; Rooney, Alexandra; Atkinson, J Hampton; Grant, Igor

    2012-04-01

    Methamphetamine (MA) use and Attention-Deficit/Hyperactivity Disorder (ADHD) commonly co-occur and are independently associated with dysregulation of frontostriatal loops and risky decision-making; however, whether their comorbidity exacerbates risky decision-making is not known. This study evaluated 23 participants with histories of MA dependence and ADHD (MA+ADHD+), 25 subjects with MA dependence alone (MA+ADHD-), and 22 healthy adults (MA-ADHD-), who completed the Iowa Gambling Task (IGT) as part of a larger neuropsychiatric research evaluation. Results showed a significant interaction between ADHD, MA, and working memory, such that individuals with working memory deficits in the MA+ADHD+ cohort demonstrated the strongest propensity to select cards from "disadvantageous" versus "advantageous" decks on the IGT. This effect was not better explained by other psychiatric, substance use, neuromedical, or cognitive factors. Findings suggest that working memory deficits may moderate the expression of risky decision-making in MA users with ADHD. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Market making vs. market manipulation : an Alberta perspective

    International Nuclear Information System (INIS)

    Johnston, P.M.

    1998-01-01

    The Alberta Stock Exchange's (ASE's) filing and disclosure requirements for market making and promotion contracts are outlined. The discussion focuses on the differences between market making and market manipulation, acceptable and unacceptable methods of market making and promotion and common trading and securities legislation violations associated with these types of activities

  2. The domestic work of consumption: materiality, migration and home-making

    OpenAIRE

    Rosales, Marta Vilar

    2010-01-01

    This article aims to discuss the potentials of an integrated approach to two significant fields of practice: materiality and migration. Based on the results of a preliminary approach to the Portuguese migrant community in Toronto and three previous ethnographies with Portuguese and Indi-Portuguese migrants conducted in Lisbon, Maputo and four Brazilian cities, it intends in particular to explore the various ways in which the home and home-making as a social and cultural process can work as a ...

  3. Optimal design of uptime-guarantee contracts under IGFR valuations and convex costs

    OpenAIRE

    Hezarkhni, Behzad

    2016-01-01

    An uptime-guarantee contract commits a service provider to maintain the functionality of a customer’s equipment at least for certain fraction of working time during a contracted period. This paper addresses the optimal design of uptime-guarantee contracts for the service provider when the customer’s valuation of a contract with a given guaranteed uptime level has an Increasing Generalized Failure Rate (IGFR) distribution. We first consider the case where the service provider proposes only one...

  4. How to Prevent Corruption Without Affecting Efficiency? An Overview of Safeguard Measures for Contracting Out Public Services

    OpenAIRE

    Roger E. HAMLIN; Bianca COBÂRZAN

    2006-01-01

    The paper addresses the issue of finding the right balance between regulatory oversight, decision-making flexibility and reliance on market forces to safeguard the contracting-out process from corruption. The paper analyses the corrupt practices associated with contracting out local public services and the causes and consequences of this behavior. Taking into consideration new anticorruption strategies, we make recommendations for attaining equilibrium between flexible safeguard measures and ...

  5. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  6. Immigration, work and health in Spain: the influence of legal status and employment contract on reported health indicators.

    Science.gov (United States)

    Sousa, Emily; Agudelo-Suárez, Andrés; Benavides, Fernando G; Schenker, Marc; García, Ana M; Benach, Joan; Delclos, Carlos; López-Jacob, María José; Ruiz-Frutos, Carlos; Ronda-Pérez, Elena; Porthé, Victoria

    2010-10-01

    To analyze the relationship of legal status and employment conditions with health indicators in foreign-born and Spanish-born workers in Spain. Cross-sectional study of 1,849 foreign-born and 509 Spanish-born workers (2008-2009, ITSAL Project). Considered employment conditions: permanent, temporary and no contract (foreign-born and Spanish-born); considered legal statuses: documented and undocumented (foreign-born). Joint relationships with self-rated health (SRH) and mental health (MH) were analyzed via logistical regression. When compared with male permanently contracted Spanish-born workers, worse health is seen in undocumented foreign-born, time in Spain ≤3 years (SRH aOR 2.68, 95% CI 1.09-6.56; MH aOR 2.26, 95% CI 1.15-4.42); in Spanish-born, temporary contracts (SRH aOR 2.40, 95% CI 1.04-5.53); and in foreign-born, temporary contracts, time in Spain >3 years (MH: aOR 1.96, 95% CI 1.13-3.38). In females, highest self-rated health risks are in foreign-born, temporary contracts (aOR 2.36, 95% CI 1.13-4.91) and without contracts, time in Spain >3 years (aOR 4.63, 95% CI 1.95-10.97). Contract type is a health determinant in both foreign-born and Spanish-born workers. This study offers an uncommon exploration of undocumented migration and raises methodological issues to consider in future research.

  7. How do we make community owned information networks work for the poor?

    CSIR Research Space (South Africa)

    Morris, CF

    2009-01-01

    Full Text Available asked in this paper is how do we make community owned information networks work for the poor? A case study from Angola shares key lessons learnt in developing shared cost models in telecentres in the face of exorbitantly high connectivity costs. The real...

  8. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  9. [Contract learning: effects of professionalization on the student nurse].

    Science.gov (United States)

    Jubin, Patricia

    2013-03-01

    The reengineering of nurse training implies the implementation of self-development, empowering tools and a reshaping of the function of accompaniment during training which becomes a shared function. This work is part of a psycho-socio-educational approach of the accompaniment to self-directed learning and also in the field of practices of health and social work. This study contributes to the identification of the conditions of efficiency of contracting between student nurses, tutors and instructors. It aims to explore the interest of a triangular steering of the learning contract centered on the student's individual project and also the interest of meetings during training as triggers to a process of self-construction of competences. Moreover, the study aims to identify the effects of contract on professionalization. Our study reverts to the basic question of learning by contract as a pillar for the self-directed learning in an alternating training context. The empirical approach takes into account a qualitative study carried out with 15 people (tutors, managers, student nurses and instructors) in 3 health care structures and a quantitative study based on 78 first year students, 106 second year students, and 47 third year students at the same nursing education institute. The study shows that learning by contract is empowering and professionalizing, if the student is placed in favorable conditions of learning and contractual relationship.

  10. Features of the content of corporate contracts

    Directory of Open Access Journals (Sweden)

    Elena Petrovna Gladneva

    2015-09-01

    Full Text Available Objective to study the legal nature to reveal the peculiarities of the subject and other essential terms of corporate contracts as a technique and means of legal regulation of corporate relations. Methods general and specific methods of cognition dialectical formal logic analysis synthesis modeling structural and systemicfunctional methods as well as comparative legal logical legal historical legal grammatical methods and systemic interpretation. Results it is concluded that the object of corporate contracts includes terms about the features of implementation of corporate rights for shares and share in capital assets conditions order of the implementation of corporate rights and approval of other actions related to company management activity reorganization and liquidation the passive duty of corporate organizations to refrain from committing any action authority arising from the nature of corporate agreements as well as the active responsibilities associated with the certain implementation of corporate rights certified by stocks shares rights to stocks shares. In addition to the subject the content of corporate contractsincludes other essential necessary conditions stipulated by the corporate legislation norms and the agreement of the participants of economic entity. Scientific novelty for the first time taking into account modern achievements of civilistic jurisprudence and practice the authors investigate the relationship between the concepts of a civil contract and corporate contract give the definition of corporate contract show the specificity of the subject and other material terms of corporate contracts. Practical significance the findings can be taken into account in the further research of corporate law issues as subbranch of civil law used in law making and enforcement activities in the educational process as a teaching material in civil law. nbsp

  11. Long term contracts in portfolios of gas supply

    International Nuclear Information System (INIS)

    Burns, D.

    1992-01-01

    This paper promotes the idea of long-term contracting for natural gas local distributors and utilities. It presents a brief history of how the spot-market developed and the effects spot-marketing can have in times of supply shortages. This has also resulted in a drastic decrease in exploration and development in the gas industry as gas supplies have exceeding demand, driving the prices down. The paper proposes several methods to restabilize the long-term contracting of gas by considering volume and pricing flexibility. Some brief discussions of industry-wide statistics are presented to show reserve replacement costs which would be needed to preserve the industry in a profit-making situation

  12. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  13. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  14. Team contracts at the Gorlovskuglestroi organization

    Energy Technology Data Exchange (ETDEWEB)

    Vasil' ev, A.Z.

    1984-08-01

    Details are given of successes achieved in mine drivage under the team contract system at Artemugol' mines. Of 43 drivage teams, 15 are working with this system. In 1983 plan figures were generally exceeded. In one mine, the new system led to an increase from 48 to 73 m/month in average drivage rates. Production per man per shift rose from 1.04 to 1.5 m/sup 3/. These increases were partly due to use of a spiral cut for explosive fracturing, BU-1 drilling units and PPN-4 loaders. More efficient work organization led to the elimination of absenteeism and a decrease in consumption of materials and compressed air. Concrete forms were used 4-5 times instead of twice, and drill bits sharpened up to 5 times. Drawbacks to the system include cumbersome accounting procedures and the need for frequent amendments to contracts.

  15. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  16. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  17. 23 CFR 635.120 - Changes and extra work.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.120 Changes and extra work. (a) Following authorization to proceed with a project, all major changes in the plans and contract provisions and all major extra... to what constitutes a non-major change and non-major extra work. (c) Changes in contract time, as...

  18. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  19. Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

    CERN Document Server

    1987-01-01

    Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

  20. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  1. Effectiveness of a return-to-work program for workers without an employment contract, sick-listed due to common mental disorders.

    Science.gov (United States)

    Lammerts, Lieke; Schaafsma, Frederieke G; Bonefaas-Groenewoud, Karin; van Mechelen, Willem; Anema, Johannes

    2016-06-01

    Both the presence of mental health problems and the absence of an employment contract have been related to long-term sickness absence and unemployment, indicating a need for return-to-work (RTW) interventions. Our aim was to study the effectiveness of a new participatory, supportive RTW program for workers without an employment contract, sick-listed 2-14 weeks due to a common mental disorder, in comparison with usual care. A participatory approach, integrated care and direct placement in a competitive job were part of the new program. The primary outcome measure was duration until first sustainable RTW in competitive employment. Cox regression analysis was applied to study this outcome. Secondary outcome measures were average working hours, duration until any type of employment, sickness benefit duration, and perceived health and functioning. In total, 186 participants were included in the study and randomly allocated to an intervention group (N=94), or control group (N= 92). A hazard ratio (HR) of 1.15 (95% CI 0.61-2.16) for duration until first sustainable RTW indicated no significant effect of allocation to the new program, compared to usual care. Furthermore, no significant differences were found in favor of the intervention group on any secondary outcome. Compared to usual care, the new program did not result in a significant shorter duration until first sustainable RTW. However, due to low protocol adherence, it remains unclear what the results would have been if the program had been executed according to protocol.

  2. Long-term contracts for European gas supply - an empirical analysis of the changing nature of pipeline and LNG-contracts

    International Nuclear Information System (INIS)

    Neumann, Anne

    2005-01-01

    model of investment in infrastructure, where buyers and sellers have different valuations for flexibility and risk reflected in the structure of signed contracts. Our empirical test is based on a unique sample of long-term contracts investigating differences in pre-specified characteristics such as take-or-pay obligations (flexibility), contract duration or committed quantities delivered throughout the contracted time period of both LNG and pipeline contracts. Simultaneously, tribute to institutional differences in market design will be paid. The paper extends earlier work by the author on long-term contracts and supply security of natural gas in Europe (Neumann 2003, Neumann and Hirschhausen, 2004). (Author)

  3. Nuclear Power Plant Construction Contracts: A Review of the Major Problems

    International Nuclear Information System (INIS)

    Crawford, B.B.

    1977-01-01

    This paper analyses the problems raised by nuclear power plant construction contracts. To the extent these contracts can be defined as devices for allocating responsibilities and risks between the Contracting Parties, the author notes that the 'responsibilities' aspect presents no problem peculiar to the nuclear sector and that difficulties mainly stem from co-ordination of work. On the other hand, the list of problems linked to 'nuclear contract risks' is long: uncertainties in the licensing procedure and export licenses, changes in pricing due to inflation, imprevision and force majeure theories, protection of proprietary information, operator's civil liability for nuclear incidents. (NEA) [fr

  4. Bid process and contracting for remediation in New Mexico

    International Nuclear Information System (INIS)

    Fox, K.

    1994-01-01

    In an effort to provide cost effective and timely reclamation services to high priority leaking underground storage tank sites the New Mexico Environment Department has implemented a reclamation bidding process for qualified state contractors. The bid process was implemented in an attempt to make reclamation contractors more competitive and to encourage innovative technologies and contracting mechanisms. Overall the Bureau has received positive feedback from contractors participating in the process, especially regarding innovative technology and contracting. In addition, the process has provided excellent training for project managers and has allowed a critical review of the reclamation process for UST sites in general

  5. MUTUAL CONCESSIONS - SPECIFIC ELEMENT OF THE COMPROMISE/TRANSACTION CONTRACT

    Directory of Open Access Journals (Sweden)

    Georgeta-Bianca Spîrchez

    2012-11-01

    Full Text Available Given the usefulness and practical importance of the compromise contract conclusion and of the amicably dispute resolution, within the business world, we aim to analyze, in what follows, the concrete means by which these kind of settlement are achieved. Two questions become legitimate in the context of concerns about mutual concessions which the parties make in a compromise contract. These questions are the following: “What are the mutual concessions? Do mutual concessions mean equivalent concessions?” and “How mutual concessions are required to complete a valid settlement? Is the requirement of mutual concessions grounded?”

  6. Mitigating Provider Uncertainty in Service Provision Contracts

    Science.gov (United States)

    Smith, Chris; van Moorsel, Aad

    Uncertainty is an inherent property of open, distributed and multiparty systems. The viability of the mutually beneficial relationships which motivate these systems relies on rational decision-making by each constituent party under uncertainty. Service provision in distributed systems is one such relationship. Uncertainty is experienced by the service provider in his ability to deliver a service with selected quality level guarantees due to inherent non-determinism, such as load fluctuations and hardware failures. Statistical estimators utilized to model this non-determinism introduce additional uncertainty through sampling error. Inability of the provider to accurately model and analyze uncertainty in the quality level guarantees can result in the formation of sub-optimal service provision contracts. Emblematic consequences include loss of revenue, inefficient resource utilization and erosion of reputation and consumer trust. We propose a utility model for contract-based service provision to provide a systematic approach to optimal service provision contract formation under uncertainty. Performance prediction methods to enable the derivation of statistical estimators for quality level are introduced, with analysis of their resultant accuracy and cost.

  7. 40-Hz square-wave stimulation requires less energy to produce muscle contraction: compared with the TASER® X26 conducted energy weapon.

    Science.gov (United States)

    Comeaux, James A; Jauchem, James R; Cox, D Duane; Crane, Carrie C; D'Andrea, John A

    2013-07-01

    Conducted energy weapons (CEWs) (including the Advanced TASER(®) X26 model produced by TASER International, Inc.) incapacitate individuals by causing muscle contractions. In this study using anesthetized swine, the potential incapacitating effect of primarily monophasic, 19-Hz voltage imposed by the commercial CEW was compared with the effect of voltages imposed by a laboratory device that created 40-Hz square waves. Forces of muscle contraction were measured with the use of strain gauges. Stimulation with 40-Hz square waves required less pulse energy than stimulation with the commercial CEW to produce similar muscle contraction. The square-pulse stimulation, at the higher repetition rate, caused a more complete tetanus at a lower energy. Use of such a simple shape of waveform may be used to make future nonlethal weapon devices more efficient. © 2013 American Academy of Forensic Sciences Published 2013. This article is a U.S. Government work and is in the public domain in the U.S.A.

  8. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  9. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  10. Acceptability and Feasibility of a Shared Decision-Making Model in Work Rehabilitation: A Mixed-Methods Study of Stakeholders' Perspectives.

    Science.gov (United States)

    Coutu, Marie-France; Légaré, France; Durand, Marie-José; Stacey, Dawn; Labrecque, Marie-Elise; Corbière, Marc; Bainbridge, Lesley

    2018-04-16

    Purpose To establish the acceptability and feasibility of implementing a shared decision-making (SDM) model in work rehabilitation. Methods We used a sequential mixed-methods design with diverse stakeholder groups (representatives of private and public employers, insurers, and unions, as well as workers having participated in a work rehabilitation program). First, a survey using a self-administered questionnaire enabled stakeholders to rate their level of agreement with the model's acceptability and feasibility and propose modifications, if necessary. Second, eight focus groups representing key stakeholders (n = 34) and four one-on-one interviews with workers were conducted, based on the questionnaire results. For each stakeholder group, we computed the percentage of agreement with the model's acceptability and feasibility and performed thematic analyses of the transcripts. Results Less than 50% of each stakeholder group initially agreed with the overall acceptability and feasibility of the model. Stakeholders proposed 37 modifications to the objectives, 17 to the activities, and 39 to improve the model's feasibility. Based on in-depth analysis of the transcripts, indicators were added to one objective, an interview guide was added as proposed by insurers to ensure compliance of the SDM process with insurance contract requirements, and one objective was reformulated. Conclusion Despite initially low agreement with the model's acceptability on the survey, subsequent discussions led to three minor changes and contributed to the model's ultimate acceptability and feasibility. Later steps will involve assessing the extent of implementation of the model in real rehabilitation settings to see if other modifications are necessary before assessing its impact.

  11. Relationship Contracting: The South Australian Experience - A Case Study

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available The construction industry has long been accusedof poor performance. The confrontational attitudeof its members and the resultant adversarial atmosphere has been identified as a major factor responsible for this poor performance. A cultural change is required to remove these barriers and to promote optimum project outcomes. Relationship contracting is promoted as a way to support the shift from the adversarial culture to the co-operative and collaborative culture within the industry and the project team.The Adelaide Convention Centre Extensions project was the first in South Australia to be procure und r the principles of relationship contract1ng. Usmg the case study approach, this paper reviews the form of relationship contracting used in this milestone project. The paper documents the lessons learned from this project and makes recommendations that can lead to improvements for future projects.

  12. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  13. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  14. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  15. Specification Section 01065S ES&H for Service Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Kirsch, Greg C. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2014-07-01

    Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positive verification.

  16. Creating smart contracts using blockchain technology

    OpenAIRE

    Baronas, Erikas

    2018-01-01

    This paper presents Blockchain, crypto-currencie’s core technology analysis and smart cont- racts potentialities research. Bringing up two frameworks - Ethereum and Bitcoin - helps to un- derstand the principles of how decentralized system work and what solutions ensure data integrity and immutability in both technologies. The main goal of this work - prove, that smart contracts can be used in real world system model. Paper egzamines prototypes, which increase exponentially by their complexit...

  17. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  18. Maternal depression and trajectories of child internalizing and externalizing problems: the roles of child decision making and working memory.

    Science.gov (United States)

    Flouri, E; Ruddy, A; Midouhas, E

    2017-04-01

    Maternal depression may affect the emotional/behavioural outcomes of children with normal neurocognitive functioning less severely than it does those without. To guide prevention and intervention efforts, research must specify which aspects of a child's cognitive functioning both moderate the effect of maternal depression and are amenable to change. Working memory and decision making may be amenable to change and are so far unexplored as moderators of this effect. Our sample was 17 160 Millennium Cohort Study children. We analysed trajectories of externalizing (conduct and hyperactivity) and internalizing (emotional and peer) problems, measured with the Strengths and Difficulties Questionnaire at the ages 3, 5, 7 and 11 years, using growth curve models. We characterized maternal depression, also time-varying at these ages, by a high score on the K6. Working memory was measured with the Cambridge Neuropsychological Test Automated Battery Spatial Working Memory Task, and decision making (risk taking and quality of decision making) with the Cambridge Gambling Task, both at age 11 years. Maternal depression predicted both the level and the growth of problems. Risk taking and poor-quality decision making were related positively to externalizing and non-significantly to internalizing problems. Poor working memory was related to both problem types. Neither decision making nor working memory explained the effect of maternal depression on child internalizing/externalizing problems. Importantly, risk taking amplified the effect of maternal depression on internalizing problems, and poor working memory that on internalizing and conduct problems. Impaired decision making and working memory in children amplify the adverse effect of maternal depression on, particularly, internalizing problems.

  19. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  20. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  1. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  2. Energetic aspects of skeletal muscle contraction: implications of fiber types.

    Science.gov (United States)

    Rall, J A

    1985-01-01

    In this chapter fundamental energetic properties of skeletal muscles as elucidated from isolated muscle preparations are described. Implications of these intrinsic properties for the energetic characterization of different fiber types and for the understanding of locomotion have been considered. Emphasis was placed on the myriad of physical and chemical techniques that can be employed to understand muscle energetics and on the interrelationship of results from different techniques. The anaerobic initial processes which liberate energy during contraction and relaxation are discussed in detail. The high-energy phosphate (approximately P) utilized during contraction and relaxation can be distributed between actomyosin ATPase or cross-bridge cycling (70%) and the Ca2+ ATPase of the sacroplasmic reticulum (30%). Muscle shortening increases the rate of approximately P hydrolysis, and stretching a muscle during contraction suppresses the rate of approximately P hydrolysis. The economy of an isometric contraction is defined as the ratio of isometric mechanical response to energetic cost and is shown to be a fundamental intrinsic parameter describing muscle energetics. Economy of contraction varies across the animal kingdom by over three orders of magnitude and is different in different mammalian fiber types. In mammalian skeletal muscles differences in economy of contraction can be attributed mainly to differences in the specific actomyosin and Ca2+ ATPase of muscles. Furthermore, there is an inverse relationship between economy of contraction and maximum velocity of muscle shortening (Vmax) and maximum power output. This is a fundamental relationship. Muscles cannot be economical at developing and maintaining force and also exhibit rapid shortening. Interestingly, there appears to be a subtle system of unknown nature that modulates the Vmax and economy of contraction. Efficiency of a work-producing contraction is defined and contrasted to the economy of contraction

  3. FORMATION AND DEVELOPMENT PROSPECTS BASED PAY EFFECTIVE CONTRACT

    Directory of Open Access Journals (Sweden)

    Владимир Иванович Долгий

    2014-01-01

    Full Text Available In this article examines the application of the principle of «effective contract», the contracting institution to be introduced into the system of labor relations. Purpose of the article is to offer an effective method of the contract for the design of incentives to domestic enterprises of different ownership forms, including the budget. Distinctive features of the work, reflecting its novelty is the use of a set of methods and techniques for building an effective motivational model, as well as practical experience in implementation of the proposed instruments in the activities of Russian enterprises. At the heart of the functioning of this institution are techniques improve the fairness of the forms and payroll systems. With the proposed program can be measured by the individual results of specific employees. Using the «effective contract» to be used in schools to improve the motivation of the teaching staff.DOI: http://dx.doi.org/10.12731/2218-7405-2013-9-61

  4. The Relationship Between Population Size and Contracting Out Public Services

    DEFF Research Database (Denmark)

    Foged, Søren Kjær

    2015-01-01

    /contracting out relationship. Results show that the relationship differs across policy sectors: It is negative for services with high fixed costs, presumably due to scale economies, and is positive for services that are difficult to measure, probably due to more administrative and technical capacity in larger......What is the causal relationship between population size and the contracting out of public service delivery in local governments? The size of the population of a given municipality has long been thought to be an important driver of contracting out public service delivery, which theoretically...... streamlines public service production and saves taxpayers’ money. This article makes use of the 2007 Danish local government structural reform—when 239 municipalities were merged into 66 new entities while 29 municipalities remained untouched—as a quasi-experiment to explore the population size...

  5. Making the organic food service chain work and survive

    DEFF Research Database (Denmark)

    Kristensen, Niels Heine; Netterstrøm, Sune; He, Chen

    2009-01-01

    and organic procurement schemes are developing as a strategic part of policymaker’s tools. However evidence has shown that the organic change agenda in public food service supply chains seems to be fragile. This is due to the fact that the organic agenda challenges the normal way that food service provision...... in the policy process that make the organic food service chain work and survive on a long-term scale.......Public food provision has received increased attention over the past decades from policymakers, consumers and citizens. As an example food at schools are increasingly coming into focus of change and innovation agendas. One of the most persistent agendas is the call for more organic foods...

  6. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  7. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  8. The Terms of the Deal: A Quality Charter School Contract Defined. Authorizing Matters. Issue Brief

    Science.gov (United States)

    Haft, William

    2009-01-01

    A contract is about commitment and responsibility. It is about the commitment that two or more parties make and the responsibility to deliver on those commitments. When school developers and authorizers turn a charter application into a contract, the relationship transforms: it shifts from aspiration to expectation and from theory to practice. The…

  9. Strictly contractive quantum channels and physically realizable quantum computers

    International Nuclear Information System (INIS)

    Raginsky, Maxim

    2002-01-01

    We study the robustness of quantum computers under the influence of errors modeled by strictly contractive channels. A channel T is defined to be strictly contractive if, for any pair of density operators ρ, σ in its domain, parallel Tρ-Tσ parallel 1 ≤k parallel ρ-σ parallel 1 for some 0≤k 1 denotes the trace norm). In other words, strictly contractive channels render the states of the computer less distinguishable in the sense of quantum detection theory. Starting from the premise that all experimental procedures can be carried out with finite precision, we argue that there exists a physically meaningful connection between strictly contractive channels and errors in physically realizable quantum computers. We show that, in the absence of error correction, sensitivity of quantum memories and computers to strictly contractive errors grows exponentially with storage time and computation time, respectively, and depends only on the constant k and the measurement precision. We prove that strict contractivity rules out the possibility of perfect error correction, and give an argument that approximate error correction, which covers previous work on fault-tolerant quantum computation as a special case, is possible

  10. Political ideology and labor arbitrators' decision making in work-family conflict cases.

    Science.gov (United States)

    Biernat, Monica; Malin, Martin H

    2008-07-01

    Labor arbitrators were asked to render decisions about grievances brought by employees who had been fired because of problems created by work conflicts with family responsibilities. The study examined the effects of experimentally manipulated grievant attributes (gender, type of work-family conflict) as well as arbitrator attributes (gender, political ideology) on decision making. When employees were depicted as having had child care problems, liberal arbitrators tended to favor female over male grievants, and political conservatism predicted more favorable judgments rendered toward male grievants. Overall, the data suggest that child care responsibilities cue different patterns of gender bias among liberal and conservative decision makers.

  11. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Science.gov (United States)

    2010-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  12. The "Make or Buy" Decision: Five Main Points to Consider

    Science.gov (United States)

    Archer, Mary Ann E.

    1978-01-01

    Five points which should be considered when making decisions about whether to purchase magnetic tapes for in-hours searching by batch processing, purchase terminals and contract with on-line vendors, or contract with information brokers for retrospective searching or SDI are availability of information in the most useful form, hardware and…

  13. Co-operation and conflict under hard and soft contracting regimes: case studies from England and Wales

    OpenAIRE

    Hughes, David; Allen, Pauline; Doheny, Shane; Petsoulas, Christina; Vincent-Jones, Peter

    2013-01-01

    BACKGROUND: This paper examines NHS secondary care contracting in England and Wales in a period which saw increasing policy divergence between the two systems. At face value, England was making greater use of market levers and utilising harder-edged service contracts incorporating financial penalties and incentives, while Wales was retreating from the 1990 s internal market and emphasising cooperation and flexibility in the contracting process. But there were also cross-border spill-overs inv...

  14. 48 CFR 27.405-1 - Special works.

    Science.gov (United States)

    2010-10-01

    ... content, performance, or disclosure of the data. Examples are contracts for— (1) The production of audiovisual works, including motion pictures or television recordings with or without accompanying sound, or... performance. Contracts for the production of audiovisual works, sound recordings, etc., may include...

  15. 48 CFR 37.602 - Performance work statement.

    Science.gov (United States)

    2010-10-01

    ... on the use of measurable performance standards and financial incentives in a competitive environment... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance work statement... CATEGORIES OF CONTRACTING SERVICE CONTRACTING Performance-Based Acquisition 37.602 Performance work statement...

  16. Between Status and Contract?

    Directory of Open Access Journals (Sweden)

    Thorsten Keiser

    2013-01-01

    Full Text Available This contribution deals with unfree labour in Germany from the early modern age until the beginning of the 20th century. It presents the main conclusions of a book published in 2013 on this subject in German. Unfree labour is not identified in the first place with slavery or any other labour relationship based on status. Instead, this study aims at an analysis of freedom and coercion in contractual labour relationships. It will be argued that in Germany contractual labour relationships before 1800 were embedded in a legal system that strongly restricted contractual autonomy and aimed at the suppression of free labour markets. The scope of this legislation was to guarantee efficient labour performance, which was not only perceived as being in the personal interest of an employer, but as a fundamental element of the common good. After 1800 the system changed to more incentive-based legislation that established freedom of contract for labour relations. Nevertheless, coercion in order to perform the contractual duties of a work contract remained important for many groups of workers, especially farmhands and industrial workers. The last criminal sanctions for breaches of labour contracts were only abolished in the revolution of 1919. This development shows the difficulties German law had in extending the principles of private law to workers. When a system of free labour was fully established, the issue of unemployment and economic problems, especially in the Weimar Republic, required a new system of protective rules. The history of free market based labour contracts in Germany was therefore very short, with state intervention shi ing from control and coercion to social assistance.

  17. Psychological contracts in self-directed work teams : Development of a validated scale and its effect on team commitment

    NARCIS (Netherlands)

    Schreuder, F.; Schalk, R.; de Jong, J.P.

    2017-01-01

    Purpose This study aims to examine reciprocal exchange in teams using a psychological contract (PC) framework. Adopting Rousseau’s conceptualization of the contract, the authors explore the extent to which the team members reciprocate perceived team obligations and fulfilment by adjusting their own

  18. Statement to Sixth Review Meeting of Contracting Parties to Convention on Nuclear Safety, 4 April 2014, Vienna, Austria

    International Nuclear Information System (INIS)

    Amano, Y.

    2014-01-01

    Full text: Good afternoon, Dear Colleagues, Ladies and Gentlemen, I am pleased to say a few words to you at the end of the Sixth Review Meeting of the Contracting Parties to the Convention on Nuclear Safety. The Convention is a very important mechanism which has contributed a lot to strengthening nuclear safety in the countries which are party to it. In the last two weeks, you have addressed some very important issues. During your productive and lively discussions, a number of challenges were identified for consideration by Contracting Parties. These included: how to achieve harmonized emergency plans and response measures; how to make better use of operating and regulatory experience and international peer review services; and how to strengthen regulators' independence, safety culture, transparency and openness. The Agency will continue to work closely with you in addressing all of these issues. The Fifth Review Conference, which took place in 2011 just after the Fukushima Daiichi accident, was the first opportunity for Contracting Parties to address the accident in an international conference. The fact that you devoted a special session to the Fukushima Daiichi accident this time demonstrates the continued resolve of the Contracting Parties to ensure that the right lessons are learned everywhere. The Agency continues to work with all our Member States to implement the IAEA Action Plan on Nuclear Safety, about which you received a briefing. I know you will agree with me that it is vitally important that all the measures that have been agreed to strengthen global nuclear safety are actually implemented. Work continues on the IAEA report on the Fukushima Daiichi accident, which will be finalised this year. I understand that you decided to submit a proposal to amend the text of the Convention, addressing design and construction objectives for both existing and new nuclear power plants, to a Diplomatic Conference to be convened within one year. I am aware that a clear

  19. Development of a Draft Core Set of Domains for Measuring Shared Decision Making in Osteoarthritis: An OMERACT Working Group on Shared Decision Making

    Science.gov (United States)

    Toupin April, Karine; Barton, Jennifer; Fraenkel, Liana; Li, Linda; Grandpierre, Viviane; Guillemin, Francis; Rader, Tamara; Stacey, Dawn; Légaré, France; Jull, Janet; Petkovic, Jennifer; Scholte Voshaar, Marieke; Welch, Vivian; Lyddiatt, Anne; Hofstetter, Cathie; De Wit, Maarten; March, Lyn; Meade, Tanya; Christensen, Robin; Gaujoux-Viala, Cécile; Suarez-Almazor, Maria E.; Boonen, Annelies; Pohl, Christoph; Martin, Richard; Tugwell, Peter

    2015-01-01

    Objective Despite the importance of shared decision making for delivering patient-centred care in rheumatology, there is no consensus on how to measure its process and outcomes. The aim of this OMERACT working group is to determine the core set of domains for measuring shared decision making in intervention studies in adults with osteoarthritis (OA), from the perspective of patients, health professionals and researchers. Methods We followed the OMERACT Filter 2.0 to develop a draft core domain set, which consisted of: (i) forming an OMERACT working group; (ii) conducting a review of domains of shared decision making; and (iii) obtaining the opinions of stakeholders using a modified nominal group process held at a session activity at the OMERACT 2014 meeting. Results 26 stakeholders from Europe, North America and Australia, including 5 patient research partners, participated in the session activity. Participants identified the following domains for measuring shared decision making to be included as part of the Draft Core Set: 1) Identifying the decision; 2) Exchanging Information; 3) Clarifying views; 4) Deliberating; 5) Making the decision; 6) Putting the decision into practice; and 7) Assessing the impact of the decision. Contextual factors were also suggested. Conclusion We propose a Draft Core Set of shared decision making domains for OA intervention research studies. Next steps include a workshop at OMERACT 2016 to reach consensus on these proposed domains in the wider OMERACT group, as well as detail sub-domains and assess instruments to develop a Core Outcome Measurement Set. PMID:25877502

  20. Development of a Draft Core Set of Domains for Measuring Shared Decision Making in Osteoarthritis: An OMERACT Working Group on Shared Decision Making.

    Science.gov (United States)

    Toupin-April, Karine; Barton, Jennifer; Fraenkel, Liana; Li, Linda; Grandpierre, Viviane; Guillemin, Francis; Rader, Tamara; Stacey, Dawn; Légaré, France; Jull, Janet; Petkovic, Jennifer; Scholte-Voshaar, Marieke; Welch, Vivian; Lyddiatt, Anne; Hofstetter, Cathie; De Wit, Maarten; March, Lyn; Meade, Tanya; Christensen, Robin; Gaujoux-Viala, Cécile; Suarez-Almazor, Maria E; Boonen, Annelies; Pohl, Christoph; Martin, Richard; Tugwell, Peter S

    2015-12-01

    Despite the importance of shared decision making for delivering patient-centered care in rheumatology, there is no consensus on how to measure its process and outcomes. The aim of this Outcome Measures in Rheumatology (OMERACT) working group is to determine the core set of domains for measuring shared decision making in intervention studies in adults with osteoarthritis (OA), from the perspectives of patients, health professionals, and researchers. We followed the OMERACT Filter 2.0 method to develop a draft core domain set by (1) forming an OMERACT working group; (2) conducting a review of domains of shared decision making; and (3) obtaining opinions of all those involved using a modified nominal group process held at a session activity at the OMERACT 12 meeting. In all, 26 people from Europe, North America, and Australia, including 5 patient research partners, participated in the session activity. Participants identified the following domains for measuring shared decision making to be included as part of the draft core set: (1) identifying the decision, (2) exchanging information, (3) clarifying views, (4) deliberating, (5) making the decision, (6) putting the decision into practice, and (7) assessing the effect of the decision. Contextual factors were also suggested. We proposed a draft core set of shared decision-making domains for OA intervention research studies. Next steps include a workshop at OMERACT 13 to reach consensus on these proposed domains in the wider OMERACT group, as well as to detail subdomains and assess instruments to develop a core outcome measurement set.

  1. [Vertical integration and contracting-out in generic hospital services in Spain].

    Science.gov (United States)

    Puig-Junoy, J; Pérez-Sust, P

    2002-01-01

    This study examines the factors that influence make or buy decisions corresponding to four generic services (housekeeping, laundry, food services, and maintenance and security) in Spanish hospitals (3,160 transactions in 790 hospitals). The empirical estimation of a logistic model based on hospital utility maximization is presented. Factors included in the model are not only those related to transaction costs, but also those related to public intervention and the political dimension. A total of 55.7% of hospitals contracted-out at least one of the generic services. The services most frequently contracted-out were housekeeping and maintenance and security(45.1 and 32.5%, respectively). In contrast, the services (94.3% and 80.1%, respectively). Hospital size (economies of scale), measured by the number of beds, was one of the most important factors influencing make or buy decisions. We find evidence that economies of scale are related to a higher level of vertical integration, while specialization and for-profit objectives favor the decision to contract-out. The choice of organizational model for laundry services presents a different pattern from that of the other three services. Empirical results show that some asset specificity could be present in laundry services.

  2. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  3. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  4. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  5. Modelling elderly cardiac patients decision making using Cognitive Work Analysis: identifying requirements for patient decision aids.

    Science.gov (United States)

    Dhukaram, Anandhi Vivekanandan; Baber, Chris

    2015-06-01

    Patients make various healthcare decisions on a daily basis. Such day-to-day decision making can have significant consequences on their own health, treatment, care, and costs. While decision aids (DAs) provide effective support in enhancing patient's decision making, to date there have been few studies examining patient's decision making process or exploring how the understanding of such decision processes can aid in extracting requirements for the design of DAs. This paper applies Cognitive Work Analysis (CWA) to analyse patient's decision making in order to inform requirements for supporting self-care decision making. This study uses focus groups to elicit information from elderly cardiovascular disease (CVD) patients concerning a range of decision situations they face on a daily basis. Specifically, the focus groups addressed issues related to the decision making of CVD in terms of medication compliance, pain, diet and exercise. The results of these focus groups are used to develop high level views using CWA. CWA framework decomposes the complex decision making problem to inform three approaches to DA design: one design based on high level requirements; one based on a normative model of decision-making for patients; and the third based on a range of heuristics that patients seem to use. CWA helps in extracting and synthesising decision making from different perspectives: decision processes, work organisation, patient competencies and strategies used in decision making. As decision making can be influenced by human behaviour like skills, rules and knowledge, it is argued that patients require support to different types of decision making. This paper also provides insights for designers in using CWA framework for the design of effective DAs to support patients in self-management. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  6. “I Can Only Work So Hard Before I Burn Out.” A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout

    Science.gov (United States)

    Jones, Samantha K.; Griep, Yannick

    2018-01-01

    Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee’s well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this “double edged” role of meaningful work by drawing from ideological psychological contracts (iPCs), which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential “dark side” of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees’ reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes. PMID:29479334

  7. “I Can Only Work So Hard Before I Burn Out.” A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout

    Directory of Open Access Journals (Sweden)

    Samantha K. Jones

    2018-02-01

    Full Text Available Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee’s well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this “double edged” role of meaningful work by drawing from ideological psychological contracts (iPCs, which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential “dark side” of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees’ reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes.

  8. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  9. Real options theory to the pricing of allowances contract to carbon emission

    International Nuclear Information System (INIS)

    Horii, Leticia Takahashi; Parente, Virginia; Goldemberg, Jose

    2010-01-01

    The objective of this work is to develop a pricing model contract for allowances to emit carbon through Real Options. Emissions allowances are equivalent tons of carbon traded between Annex I countries from companies that have the ability to reduce their emissions beyond what is assigned to it. The surplus of emission reductions produced by these companies may be sold in the emissions market. Thus, this work can contribute to improving the management of contractual risk and enable companies estimated the price at which a contract can be signed. Properly evaluate the contracts that the market environment is a challenge for companies. The historic low of information and randomness in the price of carbon allowances in the spot market suggest extreme caution in its use. (author)

  10. [The state of the psychological contract and its relation with employees' psychological health].

    Science.gov (United States)

    Gracia, Francisco Javier; Silla, Inmaculada; Peiró, José María; Fortes-Ferreira, Lina

    2006-05-01

    In the present paper the role of the state of the psychological contract to predict psychological health results is studied in a sample of 385 employees of different Spanish companies. Results indicate that the state of the psychological contract significantly predicts life satisfaction, work-family conflict and well-being beyond the prediction produced by the content of the psychological contract. In addition, trust and fairness, two dimensions of the state of psychological contract, all together contribute to explain these psychological health variables adding value to the role as predictor of fulfillment of the psychological contract. The results support the approach argued by Guest and colleagues.

  11. The application of a selection of decision-making techniques by employees in a transport work environment in conjunction with their perceived decision-making success and practice

    OpenAIRE

    Theuns F.J. Oosthuizen

    2014-01-01

    A lack of optimum selection and application of decision-making techniques, in conjunction with suitable decision-making practice and perception of employees in a transport work environment demands attention to improve overall performance. Although multiple decision-making techniques exist, five prevalent techniques were considered in this article, namely the Kepner-Tregoe, Delphi, stepladder, nominal group and brainstorming techniques. A descriptive research design was followed, using an empi...

  12. Precarious Pedagogies? The Impact of Casual and Zero-Hour Contracts in Higher Education

    Directory of Open Access Journals (Sweden)

    Ana Lopes

    2015-05-01

    Full Text Available Precarious work is associated with and characterizes the effects of neoliberal policy—the transference of economic risk onto workers, the erosion of workers’ rights, the flexibilization and casualization of work contracts, self-responsibility, financial insecurity, and emotional stress. In the Higher Education (HE sector, the number of insecure academic jobs, especially zero-hour contracts for hourly paid teaching and short-term contract research, has grown exponentially in recent years in response to the structural and fiscal changes within universities, which reflect these global shifts. This paper presents findings from a pilot study conducted with academics on casual contracts in HE institutions in England and Wales. Qualitative interviews and focus groups were undertaken with teachers (lecturers and tutors on hourly paid and zero-hour contracts to examine the relationship between their contractual situations and pedagogical practices. The research broadly seeks to contribute to ongoing discussions concerned with the impact of neoliberalism on higher education and specifically highlights the case of contingent lecturers as casualties of the casualization of the academic labor force.

  13. Contracts for joint provision of local public services

    Directory of Open Access Journals (Sweden)

    Francisco José Villar Rojas

    2017-09-01

    Full Text Available This paper studies the way a Local authority can provide a public service of its competence jointly or cooperatively with other public authorities. Specifically, article 12.4 of Directive 2014/24 /EU, on «contracts for the joint provision of public services», is analyzed. Its basis and the conditions that must be fulfilled for its valid use are studied, as it is an exception to the rules on public works contracts. The conclusion is that European law supports and regulates a traditional way of managing local public services.

  14. 13 CFR 305.13 - Contract change orders.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract change orders. 305.13 Section 305.13 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE... all such work will be at the Recipient's risk until EDA completes its review. ...

  15. 77 FR 43080 - Federal Acquisition Regulation; Information Collection; Make-or-Buy Program

    Science.gov (United States)

    2012-07-23

    ... by make-or-buy decisions under certain Government prime contracts. Accordingly, FAR 15.407-2, Make-or...; Information Collection; Make-or- Buy Program AGENCIES: Department of Defense (DOD), General Services... requirement concerning Make- or-Buy Program. Public comments are particularly invited on: Whether this...

  16. Safety and health education and training of contract workers in nuclear power plants

    International Nuclear Information System (INIS)

    Matsumoto, Akikuni; Hara, Hisayuki; Nawata, Kazumitsu

    2008-01-01

    Nuclear power plants have used many contract workers. Their safety and health conditions are very important in Japan. Several amendments, which deregulate temporary personnel service and employment agency markets, have been done in recent years. The number of contract and temporary help agency workers have been rapidly increasing especially since the 1990s. As a result, ensuring the level of safety and health education and training of workers becomes a serious problem. This paper examines the possibility that the level of safety training of the contract workers is less than that of the direct-hire employees in nuclear power plants. We show that (1) the use of contract workers could be less efficient for ensuring the level of safety training, and (2) nuclear power plants still use contract workers in some situations in spite of the loss of efficiency. We also study legislations and past cases relating to nuclear power generation. We find that there are some structural problems that might make the contract workers less trained. (author)

  17. Positive feelings facilitate working memory and complex decision making among older adults.

    Science.gov (United States)

    Carpenter, Stephanie M; Peters, Ellen; Västfjäll, Daniel; Isen, Alice M

    2013-01-01

    The impact of induced mild positive feelings on working memory and complex decision making among older adults (aged 63-85) was examined. Participants completed a computer administered card task in which participants could win money if they chose from "gain" decks and lose money if they chose from "loss" decks. Individuals in the positive-feeling condition chose better than neutral-feeling participants and earned more money overall. Participants in the positive-feeling condition also demonstrated improved working-memory capacity. These effects of positive-feeling induction have implications for affect theory, as well as, potentially, practical implications for people of all ages dealing with complex decisions.

  18. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    Science.gov (United States)

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been

  19. Contract gangs: race, gender and vulnerability

    Directory of Open Access Journals (Sweden)

    Heather Goodall

    2015-12-01

    Full Text Available While violence directed at Indian students in Australian cities has been highlighted in the Indian and Australian press, far less attention has been paid to the violence directed at Indians in rural areas. This has most often involved Indians employed in contract labour in seasonal industries like fruit or vegetable picking. This article reviews various media accounts, both urban and rural, of violence directed at Indians from 2009 to 2012. It draws attention to the far longer history of labour exploitation which has taken place in rural and urban Australia in contract labour conditions and the particular invisibility of rural settings for such violence. Racial minorities, like Aboriginal and Chinese workers, and women in agriculture and domestic work, have seldom had adequate power to respond industrially or politically. This means that in the past, these groups been particularly vulnerable to such structural exploitation. The paper concludes by calling for greater attention not only to the particular vulnerability of Indians in rural settings but to the wider presence of racialised and gendered exploitation enabled by contract labour structures.

  20. 48 CFR 436.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...

  1. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  3. A Longitudinal Study of Age-Related Differences in Reactions to Psychological Contract Breach

    NARCIS (Netherlands)

    Bal, P.M.; Lange, A.H. de; Jansen, P.G.W.; Velde, M.E.G. van der

    2013-01-01

    The current paper investigated age-related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  4. A longitudinal study of age-related differences in reactions to psychological contract breach

    NARCIS (Netherlands)

    Bal, P.M.; de Lange, A.H.; Jansen, P.G.W.; van der Velde, E.G.

    2013-01-01

    The current paper investigated age-related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  5. a longitudinal study of age-related differences in reactions to phsycological contract breach

    NARCIS (Netherlands)

    Paul Jansen; Annet de Lange; Matthijs Bal; Mandy van der Velde

    2013-01-01

    The current paper investigated age‐related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  6. Supersize my identity: when thoughts of contracting swine flu boost one's patriotic identity

    NARCIS (Netherlands)

    Bélanger, J.J.; Faber, T.; Gelfand, M.J.

    2013-01-01

    Pandemics are socially threatening situations that rapidly spread across large regions. Thinking of contracting dangerous diseases can potentially evoke fear and death-related thoughts. The aim of the present work was to investigate how individuals respond to fear associated with contracting a

  7. Compact Environmental Anomaly Sensor (CEASE) Flight Integration Support Contract

    National Research Council Canada - National Science Library

    Redus, Robert

    2001-01-01

    .... Under the current contract, Amptek Inc, supported the successful spacecraft specific design work, final calibration, and the delivery, integration, and launch of two CEASE instruments - S/N 001 onto...

  8. International contracts within the business of MSMEs

    Directory of Open Access Journals (Sweden)

    Martha Cecilia López Fonseca

    2012-07-01

    Full Text Available The purpose is to explain, in general terms, some of the possibilities for micro, small and medium enterprises (MSMEs to internationalize, taking into consideration, among other aspects, the elaboration of the contract, preferably written. The meaning of international trade comes from the mercantilist, classical and neoclassical currents and from contemporary postulates, such as the theory of competitive advantage, which demonstrate the importance of the exchange of goods and services for economies. International trade relations of any company are based on requirements of importing or exporting raw materials, machinery, final and intermediate goods or services procurement. However, in practice, relations can cover a wider spectrum than the abovementioned operations. This essay mentions some elements that should be considered by the parties when making the negotiation and which will be reflected in the body of the contract.

  9. Uncovering the decision-making work of transferring dying patients home from critical care units: An integrative review.

    Science.gov (United States)

    Lin, Yanxia; Myall, Michelle; Jarrett, Nikki

    2017-12-01

    To understand how decisions are made to transfer dying patients home from critical care units. Many people prefer a home death, but a high proportion die in critical care units. Transferring dying patients home is recognized to be complex but transfer decision-making itself remains unclear. Integrative review. Seven bibliographic databases (origin-2015), grey literature and reference lists were searched. An integrative review method was used to synthesize data from diverse sources. Papers were selected through title and abstract screening and full-text reviewing, using inclusion and exclusion criteria derived from review questions. Following quality appraisal, data were extracted and synthesized using normalization process theory as a framework. The number of patients transferred home ranged from 1-346, with most papers reporting on the transfer of one or two patients. Four themes regarding transfer decision-making work were generated: divergent views and practice, multiple stakeholders' involvement in decision-making, collective work and limited understanding of individuals' experiences. The practice of transferring patients home to die and its decision-making varies internationally and is usually influenced by the care system, culture or religion. It is less common to transfer patients home to die from critical care units in western societies. A better understanding of the decision-making work was obtained but mainly from the perspective of hospital-based healthcare professionals. Further research is needed to develop decision-making practice guidance to facilitate patients' wishes to die at home. © 2017 John Wiley & Sons Ltd.

  10. INVESTIGATING WHAT ROMANIAN IT RECRUITERS AND EMPLOYEES VALUE WHEN THEY NEGOTIATE EMPLOYMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Anca Maria CLIPA

    2017-12-01

    Full Text Available When negotiating, people have economic as well noneconomic, subjective concerns. This study is an exploratory investigation into the objective and subjective factors influencing employment contract negotiations and the willingness to interact in future business negotiations in the case of Romanian IT employees and recruiters. The study draws on qualitative data collection and analysis methods, i.e. semi-structured interviews with 10 participants, projective techniques and content analysis. At the time, 5 of the participants held recruitment and contracting HR roles, and 5 were working as employees (programmers, business analysts, IT project managers. They all had a recent working contract negotiation experience (less than one year ago in the IT industry. Using the principles of corpus linguistics and the methods specific to discourse and critical discourse analysis, our study highlights some of the factors taken into account by Romanian IT employees and recruiters in employment contract negotiations.

  11. 48 CFR 47.207-2 - Duration of contract and time of performance.

    Science.gov (United States)

    2010-10-01

    ... performance of segments of a major job; e.g., an office relocation for which the work phases must be... time of performance. 47.207-2 Section 47.207-2 Federal Acquisition Regulations System FEDERAL...-Related Services 47.207-2 Duration of contract and time of performance. The contracting officer shall— (a...

  12. 7 CFR 1484.35 - Must Cooperators follow specific contracting procedures?

    Science.gov (United States)

    2010-01-01

    ... the decision-making process. [64 FR 52630, Sept. 30, 1999. Redesignated and amended at 65 FR 9995, Feb...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS PROGRAMS TO..., which are reimbursed with project funds, are documented by a purchase order, invoice, or contract; (2...

  13. 48 CFR 35.005 - Work statement.

    Science.gov (United States)

    2010-10-01

    .... (b) In basic research the emphasis is on achieving specified objectives and knowledge rather than on... between work statements for fixed-price contracts and cost-reimbursement contracts should be even clearer...

  14. Trust-based or performance-based management: a study of employment contracting in hospitals.

    Science.gov (United States)

    Pettersen, Inger Johanne

    2011-01-01

    Hospitals are frequently changing managerial practices due to numerous public sector reforms taking place. In general, these reforms include the making and monitoring of contracts that regulate relations between the hospitals and their professional staffs. The aim of this paper is to discuss some main characteristics of the contracts that regulate the perceived relations between physicians as employees and the public hospital as employer. The theoretical framework is based on a contract theory approach. The empirical data is based on survey data from full-time employed physicians in the medical and surgical divisions in one of the largest university hospitals in Norway. This study shows that perceived obligations and psychological contracts indicate high degree of relational contracts between the hospital and the physicians. These socio-cultural elements should be recognized as important mechanisms of coordination and communication when policy makers and hospital managers are designing hospital management control systems. Copyright © 2009 John Wiley & Sons, Ltd.

  15. Availability and the use of work-life balance benefits guaranteed by the Polish Labour Code among workers employed on the basis of employment contracts in small and medium enterprises

    OpenAIRE

    Aleksandra Andysz; Aleksandra Jacukowicz; Aleksander Stańczak; Marcin Drabek

    2016-01-01

    Objectives: Polish Labour Code provides employees with a range of solutions (benefits) supporting them in achieving balance between work and private life. This paper was aimed at indicating availability and the use of legal benefits supporting work-life balance (WLB) among Polish workers of small and medium enterprises. Material and Methods: The study sample included 219 respondents, aged 22–64, working in small and medium enterprises and employed on the basis of employment contracts for at l...

  16. Temporary Workforce Planning with Firm Contracts: A Model and a Simulated Annealing Heuristic

    Directory of Open Access Journals (Sweden)

    Muhammad Al-Salamah

    2011-01-01

    Full Text Available The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution.

  17. 7 CFR 1486.303 - What specific contracting procedures must be adhered to?

    Science.gov (United States)

    2010-01-01

    ...) Document the decision-making process. ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS EMERGING... documented by a purchase order, invoice, or contract; (2) Ensure that no employee or officer participates in...

  18. Making Markets in Long-Term Care: Or How a Market Can Work by Being Invisible.

    Science.gov (United States)

    Grit, Kor; Zuiderent-Jerak, Teun

    2017-09-01

    Many Western countries have introduced market principles in healthcare. The newly introduced financial instrument of "care-intensity packages" in the Dutch long-term care sector fit this development since they have some characteristics of a market device. However, policy makers and care providers positioned these instruments as explicitly not belonging to the general trend of marketisation in healthcare. Using a qualitative case study approach, we study the work that the two providers have done to fit these instruments to their organisations and how that enables and legitimatises market development. Both providers have done various types of work that could be classified as market development, including creating accounting systems suitable for markets, redefining public values in the context of markets, and starting commercial initiatives. Paradoxically, denying the existence of markets for long-term care and thus avoiding ideological debates on the marketisation of healthcare has made the use of market devices all the more likely. Making the market invisible seems to be an operative element in making the market work. Our findings suggest that Dutch long-term care reform points to the need to study the 'making' rather than the 'liberalising' of markets and that the study of healthcare markets should not be confined to those practices that explicitly label themselves as such.

  19. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  20. Did the Labor Contracts between the UAW and the Big Three Automakers Work?

    Science.gov (United States)

    Lucas, John J.; Furdek, Jonathan M.

    2010-01-01

    In the Fall 2007, there were landmark labor contracts agreed upon between the United Autoworkers (UAW) and the Big Three Automakers--General Motors, Ford Motor Company, and Chrysler LLC. The impetus for these truly historic labor agreements was to afford the automakers to remain competitive in the global market while labor was to be protected.…

  1. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  2. The Green Stamp in Power Supply Contracts - A proposal for the Brazilian Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Estrocio, Joao Paulo

    2010-09-15

    The insertion of a certification mechanism for discriminatory energy supply contracts aiming to make it possible to contract exclusively clean and renewable energy is presented. With the increasing interest for sustainability and carbon emissions reduction, there's a growing demand for clean energy reflected in people's choices for cleaner products. Electricity in a power grid, however, is result of a set of sources or plants, and its operation or dispatch. A proposal for clean energy contracts is presented, providing the market and the clients with the ability to choose to buy exclusively renewable energy through the grid.

  3. Right to property, inheritance, and contract and persons with mental illness.

    Science.gov (United States)

    Bhugra, Dinesh; Pathare, Soumitra; Joshi, Rajlaxmi; Nardodkar, Renuka; Torales, Julio; Tolentino, Edgardo Juan L; Dantas, Rubens; Ventriglio, Antonio

    2016-08-01

    Discrimination against people with mental illness is rife across the globe. Among different types of discrimination is the policy in many countries where persons with mental illness are forbidden to inherit property, and they are not able to enter into a contract in a large number of countries. Using various databases, legislations dealing with law of contract, law of succession/inheritance, and law relating to testamentary capacity (wills) of all UN Member states (193 countries) were studied. With respect to federal countries, the laws of the most populous state as a representative state in the respective country were studied. Only 40 Member States (21%) recognize/allow persons with mental health problems to enter into contracts. Of these, however, only 16 Member States (9%) recognize the right of persons with mental health problems to enter into a contract without any restrictions. The remaining 24 Member States (12%) allow a contract entered into by a person with mental health problems to be invalidated under certain conditions. These countries also make the validity of the contract subject to the capacity to consent or based on the level of understanding of the person with mental health problems. They may allow persons with mental health problems to enter into contracts only for transactions of an insignificant nature or of personal rights. Only 9% of the countries allow people with mental illness to enter into contracts in an unrestricted way. Furthermore, there remain variations between high income and low income states. In spite of international laws in many countries, laws remain discriminatory.

  4. Psychological contract breaches, organizational commitment, and innovation-related behaviors: a latent growth modeling approach.

    Science.gov (United States)

    Ng, Thomas W H; Feldman, Daniel C; Lam, Simon S K

    2010-07-01

    This study examined the relationships among psychological contract breaches, organizational commitment, and innovation-related behaviors (generating, spreading, implementing innovative ideas at work) over a 6-month period. Results indicate that the effects of psychological contract breaches on employees are not static. Specifically, perceptions of psychological contract breaches strengthened over time and were associated with decreased levels of affective commitment over time. Further, increased perceptions of psychological contract breaches were associated with decreases in innovation-related behaviors. We also found evidence that organizational commitment mediates the relationship between psychological contract breaches and innovation-related behaviors. These results highlight the importance of examining the nomological network of psychological contract breaches from a change perspective.

  5. Return to work of workers without a permanent employment contract, sick-listed due to a common mental disorder: design of a randomised controlled trial.

    Science.gov (United States)

    Lammerts, Lieke; Vermeulen, Sylvia J; Schaafsma, Frederieke G; van Mechelen, Willem; Anema, Johannes R

    2014-06-12

    Workers without a permanent employment contract represent a vulnerable group within the working population. Mental disorders are a major cause of sickness absence within this group. Common mental disorders are stress-related, depressive and anxiety disorders. To date, little attention has been paid to effective return to work interventions for this type of sick-listed workers. Therefore, a participatory supportive return to work program has been developed. It combines elements of a participatory return to work program, integrated care and direct placement in a competitive job.The objective of this paper is to describe the design of a randomised controlled trial to evaluate the cost-effectiveness of this program compared to care as usual. The cost-effectiveness of the participatory supportive return to work program will be examined in a randomised controlled trial with a follow-up of twelve months.The program strongly involves the sick-listed worker in the identification of obstacles for return to work and possible solutions, resulting in a consensus based action plan. This plan will be used as a starting point for the search of suitable competitive employment with support of a rehabilitation agency. During this process the insurance physician of the sick-listed worker contacts other caregivers to promote integrated care.Workers eligible to participate in this study have no permanent employment contract, have applied for a sickness benefit at the Dutch Social Security Agency and are sick-listed between two and fourteen weeks due to mental health problems.The primary outcome measure is the duration until first sustainable return to work in a competitive job. Outcomes are measured at baseline and after three, six, nine and twelve months. If the participatory supportive return to work program proves to be cost-effective, the social security system, the sick-listed worker and society as a whole will benefit. A cost-effective return to work program will lead to a

  6. Analysis of equilibrium about bidding strategy of suppliers with future contracts

    International Nuclear Information System (INIS)

    Yuan, Zhiqiang; Liu, Dong; Jiang, Chuanwen

    2007-01-01

    In this paper, the supply function model is employed to simulate the bidding strategy of suppliers in the power pool, and models of the supply function with future contracts are presented. It is proved that only one of the parameters between slope and intercept of the bidding curve is an independent variable in order to achieve definite equilibrium. In the meantime, the equilibria of the bidding strategy about suppliers are studied when different intercepts of the bidding curve are chosen. Some examples are employed to study the Nash equilibrium strategies of suppliers with different future contracts in various bidding strategy models. The results show that the equilibria are different in different bidding strategy models, but the future contracts can effectively make spot prices decrease in all the models

  7. Actively coping with violation : Exploring upward dissent patterns in functional, dysfunctional, and deserted psychological contract end states

    NARCIS (Netherlands)

    Schalk, M.J.D.; De Ruiter, M.; Van Loon, J.; Kuijpers, E.; Van Regenmortel, M.R.F.

    2018-01-01

    Recently, scholars have emphasized the importance of examining how employees cope with psychological contract violation and how the coping process contributes to psychological contract violation resolution and post-violation psychological contracts. Recent work points to the important role of

  8. Governance in Blockchain Technologies & Social Contract Theories

    Directory of Open Access Journals (Sweden)

    Wessel Reijers

    2016-12-01

    Full Text Available This paper is placed in the context of a growing number of social and political critiques of blockchain technologies. We focus on the supposed potential of blockchain technologies to transform political institutions that are central to contemporary human societies, such as money, property rights regimes, and systems of democratic governance. Our aim is to examine the way blockchain technologies canbring about - and justify - new models of governance. To do so, we draw on the philosophical works of Hobbes, Rousseau, and Rawls, analyzing blockchain governance in terms of contrasting social contract theories. We begin by comparing the justifications of blockchain governance offered by members of the blockchain developers’ community with the justifications of governance presented within social contract theories. We then examine the extent to which the model of governance offered by blockchain technologies reflects key governance themes and assumptions located within social contract theories, focusing on the notions of sovereignty, the initial situation, decentralization and distributive justice.

  9. The contracting round: achieving health gain or financial balance?

    Science.gov (United States)

    McCarthy, M

    1998-12-01

    In the 1991 National Health Service reforms, health authorities became responsible for the health of their resident population, and they contract for health services from NHS providers - trusts and primary care services. A case study in Camden and Islington, an inner London health district, during 1996-1997 shows that contracting was directed more towards achieving financial balance than health objectives. Reasons include the inflationary effect of competition within an internal market, the power of administrators in decision-making within the health authority, and lack of adequate financial accounting in the NHS to relate costs to health outcomes. The introduction of programme budgets for districts would provide more cost-effective use of the nation's resources.

  10. The role of collective labor contracts and individual characteristics on job satisfaction in Tuscan nursing homes.

    Science.gov (United States)

    Vainieri, Milena; Smaldone, Pierluigi; Rosa, Antonella; Carroll, Kathleen

    2017-08-23

    The role played by remuneration strategies in motivating health care professionals is one of the most studied factors. Some studies of nursing home (NH) services, while considering wages and labor market characteristics, do not explicitly account for the influence of the contract itself. This study investigates the relationship between the labor contracts applied in 62 Tuscan NHs and NH aides' job satisfaction with two aims: to investigate the impact of European contracts on employee satisfaction in health care services and to determine possible limitations of research not incorporating these contracts. We apply a multilevel model to data gathered from a staff survey administered in 2014 to all employees of 62 NHs to analyze two levels: individual and NH. Labor contracts were introduced into the model as a variable of NH. Findings show that the factors influencing nursing aides' satisfaction occur at both the individual and NH levels. Organizational characteristics explain 16% of the variation. For individual characteristics, foreign and temporary workers emerge as more satisfied than others. For NH variables, results indicate that the labor contract with the worst conditions is not associated with lower workers' satisfaction. Although working conditions play a relevant role in the job satisfaction of aides, labor contracts do not seem to affect it. Interestingly, aides of the NHs with the contract having the best conditions register a significantly lower level of satisfaction compared to the NHs with the worst contract conditions. This suggests that organizational factors such as culture, team work, and other characteristics, which were not explicitly considered in this study, may be more powerful sources of worker satisfaction than labor contracts. Our analysis has value as a management tool to consider alternative sources as well as the labor contract for employee incentives.This is an open-access article distributed under the terms of the Creative Commons

  11. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  12. The misrepresentation as a reason of rescission of contract

    Directory of Open Access Journals (Sweden)

    Popov Danica

    2013-01-01

    Full Text Available Sometimes a person may enter into a contract as a result of a statement made to him which is false. If the statement is a term of the contract he will have a remedy for breach of contract. If the statement is not a term of the contract it is called a mere misrepresentation, and the consequence is rescission of contract. A misrepresentation is an untrue statement of fact which is one of the causes which induces the contract. A misrepresentation is statement, or conduct, which conveys a false or wrong impression. A contract may be rescined on the ground of misrepresentation even if innocent. An innocent misrepresentation is one made with reasonable ground for believing it to be true, as where an honest mistake is made. The types of misrepresentation are various. Acording to the Obligation Act it is not any misrepresentation cause the rescind of contract, but only the importance one. The importance misrepresentations are: the error in supstantia and error in personae if the contract is made bearing in mind intuit personae contract. This paper explanes different kinds of misrepresentation giving some proposal for legal interpretation of the provisions of the Obligation Act. The misrepresentation means an untrue statement of facts, made by one party to the other in the course of negotiating a contract, that induces the other party to enter into the contract. The person making the misrepresentation is called the representor, and the person whom it is made is the representee. A false of fraudulent misrepresentation is one made with knowledge of its falsehood, and intended to deceive. In the case of fraudulent misrepresentation representor did not honestly believe in the truth of his statement, which is not the same as saying that he knew it to be false. A negligent misrepresentation is one made with no reasonable grounds for believing in to be true. An innocent misrepresentation is one made with reasonable grounds for believing in to the true, as where

  13. The profound precariousness of work through temporary work agency

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2016-12-01

    Full Text Available The increase in the number of atypical work contracts in the field of industry relationships, as part of a major European trend towards gaining more flexibility in the labour market, is significant and cannot be overlooked in most member countries of the European Union. This finding is corroborated by the recent surveys conducted across Europe, that reveal the prevalence of these flexible ways of organizing work, over the archetypal template of the individual work contract. However, this range of atypical contractual arrangements and the great number of versions and subcategories they include, are describing a number of negative features that seem to characterize these new forms of employment. Since the field of atypical employment is complex and we cannot analyse the incidence of these negative effects for all the atypical methods of employment, in the following article we will limit ourselves to explore the pressing issues related to the system of temporary work through work agencies. As we shall see, all aspects of the salary field, of health and safety at work and the level of insecurity and instability of labour through temporary work agency reveals a strong character associated with this kind of precarious employment.

  14. Report of the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    The report from the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators on the future management and disposition of the power purchase agreements entered into by Ontario Hydro with each non-utility generator (a NUG) is discussed. The integration of NUG contracts into a restructured competitive electricity market, the complexity of the contracts and the disparity of size, resources and approach to the integration exercise of the NUGs produces to an array of challenging issues. The committee identified three alternative strategies for dealing with NUG contracts in Ontario. The first is to use the independent Electricity Market Operator as a purely passive contract holder and above-market cost collection agent. The second is to make the Ontario Electricity Financial Corporation (OEFC) the contract holder and use a commercially oriented manager to administer the NUG contracts. This would minimize above-market costs and to advise on buyouts, compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a single pooled Competition Transfer Charge. The third is to make the OEFC the contract holder, use a commercially oriented manager to administer the NUG contracts, to minimize above-market costs and to advise on buyouts. The OEFC would compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a pooled CTC. The IMO would be used to collect the above-market NUG contract part of the pooled CTC as agent of the contract holder, in a contract uplift that would, like the levy in the first strategy, be charged to wholesale market participants and be included in rates paid by domestic end-use customers.1

  15. 48 CFR 2937.103-70 - Department of Labor checklist to aid analysis and review of requirements for service contracts.

    Science.gov (United States)

    2010-10-01

    ... provide for adequate monitoring of contractor performance? (3) Is the statement of work written so that it... contract? (4) Will the contractor be evaluating a competitor's work? (5) Does the contract allow the...

  16. Promised and Delivered Inducements and Contributions: An Integrated View of Psychological Contract Appraisal

    Science.gov (United States)

    Lambert, Lisa Schurer

    2011-01-01

    The reciprocal exchange of employees' work for pay that is central to employment relationships is viewed here through the lens of the psychological contract. A psychological contract involves promised inducements, promised contributions, delivered inducements, and delivered contributions: How an employee cognitively integrates these 4 elements is…

  17. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  18. Heterogeneous agents and decison making within firms

    OpenAIRE

    Hung, Chung-yu

    2015-01-01

    This dissertation explores the implications of agents’ heterogeneity in decision making within situations where information is not completely contractible. Specifically, the study applies empirical methods across three chapters to examine the role of employees’ traits and their mutual relationships in decision making within firms. The first chapter investigates the association between managerial ability and managers’ discretionary bonus decisions using a dataset from a Chinese hospital and sh...

  19. A participatory supportive return to work program for workers without an employment contract, sick-listed due to a common mental disorder: an economic evaluation alongside a randomized controlled trial.

    NARCIS (Netherlands)

    Lammerts, L.; van Dongen, J.M.; Schaafsma, F.G.; van Mechelen, W.; Anema, J.R.

    2017-01-01

    BACKGROUND: Mental disorders are associated with high costs for productivity loss, sickness absence and unemployment. A participatory supportive return to work (RTW) program was developed in order to improve RTW among workers without an employment contract, sick-listed due to a common mental

  20. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  1. Some considerations on the legal qualification of the contracting authority

    Directory of Open Access Journals (Sweden)

    Ioana Panagoreț

    2016-12-01

    Full Text Available The present study makes an analysis of the concept of contracting authority in the context in which the legal definition of this concept leads, in several specific cases, to doubts and the impossibility of correct application of the law when one puts into discussion the local authorities and some legal persons of public law who have a well-defined legal status. Both situations create real difficulties in practice by the correct application of public procurement law so that it may challenge these parts of such public contracts even if they are of good faith and desire the fair enforcement of law.

  2. How to Prevent Corruption Without Affecting Efficiency? An Overview of Safeguard Measures for Contracting Out Public Services

    Directory of Open Access Journals (Sweden)

    Roger E. HAMLIN

    2006-02-01

    Full Text Available The paper addresses the issue of finding the right balance between regulatory oversight, decision-making flexibility and reliance on market forces to safeguard the contracting-out process from corruption. The paper analyses the corrupt practices associated with contracting out local public services and the causes and consequences of this behavior. Taking into consideration new anticorruption strategies, we make recommendations for attaining equilibrium between flexible safeguard measures and accountable and transparent practices aimed at verifying whether regulations and standards are met. The strategy also emphasizes the training of public officials, to provide them with appropriate skills and professional capacity to identify and manage corruption risks. The last part of the paper recommends future research to identify best practices among different communities and states attempting to control corruption practices when contracting out public services.

  3. [Work satisfaction among Spanish nurses working in English hospitals].

    Science.gov (United States)

    Ruzafa-Martínez, María; Madrigal-Torres, Manuel; Velandrino-Nicolás, Antonio; López-Iborra, Lidón

    2008-01-01

    To evaluate work satisfaction among Spanish nurses employed by English hospitals, as well as the influence of several social and work-related variables associated with satisfaction. We performed a cross-sectional study. All Spanish nurses (n=360) with a contract with any English hospital in April 2003 were included in the study. The self-administered and validated Font Roja work satisfaction questionnaire was used. The response rate was 78.6%. Overall work satisfaction among Spanish nurses was medium. The dimensions with higher work satisfaction were relationships with colleagues and superiors. The dimensions showing lowest work satisfaction were job satisfaction and professional competence. Statistically significant and positive associations were obtained between level of English, professional grade, shift pattern, working in the intensive care unit or accident and emergency department, time worked in English hospitals and degree of work satisfaction. Employers of Spanish nurses should try to increase job satisfaction and professional competence among these workers. Incentivation and professional promotion systems might help achieve this aim. Employers could also try to improve Spanish nurses' English level before contracts are signed and pay special attention to their needs during the first working year. Spanish nurses job satisfaction would also increase if they were allowed to choose their working shift and the unit or ward where they are going to work.

  4. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  5. Variability in visual working memory ability limits the efficiency of perceptual decision making.

    Science.gov (United States)

    Ester, Edward F; Ho, Tiffany C; Brown, Scott D; Serences, John T

    2014-04-02

    The ability to make rapid and accurate decisions based on limited sensory information is a critical component of visual cognition. Available evidence suggests that simple perceptual discriminations are based on the accumulation and integration of sensory evidence over time. However, the memory system(s) mediating this accumulation are unclear. One candidate system is working memory (WM), which enables the temporary maintenance of information in a readily accessible state. Here, we show that individual variability in WM capacity is strongly correlated with the speed of evidence accumulation in speeded two-alternative forced choice tasks. This relationship generalized across different decision-making tasks, and could not be easily explained by variability in general arousal or vigilance. Moreover, we show that performing a difficult discrimination task while maintaining a concurrent memory load has a deleterious effect on the latter, suggesting that WM storage and decision making are directly linked.

  6. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  7. 48 CFR 1852.216-76 - Award Fee for service contracts.

    Science.gov (United States)

    2010-10-01

    ... payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for... [insert payment office] will make payment based on [Insert method of authorizing award fee payment, e.g... fee has been paid, the Contracting Officer may direct the withholding of further payment of award fee...

  8. Making it lean applying lean practices to the work of it

    CERN Document Server

    Williams, Howard

    2013-01-01

    Making IT Lean: Applying Lean Practices to the Work of IT presents Lean concepts and techniques for improving processes and eliminating waste in IT operations and IT Service Management, in a manner that is easy to understand. The authors provide a context for discussing several areas of application within this domain, allowing you to quickly gain insight into IT processes and Lean principles.The text reviews IT Service Management, with reference to the IT Infrastructure Library (ITIL®) as a framework for best practices-explaining how to use it to accommod

  9. The domestic work of consumption: materiality, migration and home-making

    Directory of Open Access Journals (Sweden)

    Marta Vilar Rosales

    2010-10-01

    Full Text Available This article aims to discuss the potentials of an integrated approach to two significant fields of practice: materiality and migration. Based on the results of a preliminary approach to the Portuguese migrant community in Toronto and three previous ethnographies with Portuguese and Indi-Portuguese migrants conducted in Lisbon, Maputo and four Brazilian cities, it intends in particular to explore the various ways in which the home and home-making as a social and cultural process can work as a significant field to explore that relation. It will be argued that domestic materiality constitutes a particularly productive field to look at the relationships between macro-contexts and micro-practices, social formations and cultural institutions that affect and shape the life experiences of those who migrate. In order to discuss its participation in the evaluations, reconfigurations and processes of rebuilding / reconstructions that necessarily take part in all migratory movements, the work of domestic consumption will be addressed as an expression of those processes but also as a constitutive activity, i. e., the (reproduction of identity and belonging.

  10. Monitoring supports performance in a dual-task paradigm involving a risky decision-making task and a working memory task

    Directory of Open Access Journals (Sweden)

    Bettina eGathmann

    2015-02-01

    Full Text Available Performing two cognitively demanding tasks at the same time is known to decrease performance. The current study investigates the underlying executive functions of a dual-tasking situation involving the simultaneous performance of decision making under explicit risk and a working memory task. It is suggested that making a decision and performing a working memory task at the same time should particularly require monitoring - an executive control process supervising behavior and the state of processing on two tasks. To test the role of a supervisory/monitoring function in such a dual-tasking situation we investigated 122 participants with the Game of Dice Task plus 2-back task (GDT plus 2-back task. This dual task requires participants to make decisions under risk and to perform a 2-back working memory task at the same time. Furthermore, a task measuring a set of several executive functions gathered in the term concept formation (Modified Card Sorting Test, MCST and the newly developed Balanced Switching Task (BST, measuring monitoring in particular, were used. The results demonstrate that concept formation and monitoring are involved in the simultaneous performance of decision making under risk and a working memory task. In particular, the mediation analysis revealed that BST performance partially mediates the influence of MCST performance on the GDT plus 2-back task. These findings suggest that monitoring is one important subfunction for superior performance in a dual-tasking situation including decision making under risk and a working memory task.

  11. Monitoring supports performance in a dual-task paradigm involving a risky decision-making task and a working memory task

    Science.gov (United States)

    Gathmann, Bettina; Schiebener, Johannes; Wolf, Oliver T.; Brand, Matthias

    2015-01-01

    Performing two cognitively demanding tasks at the same time is known to decrease performance. The current study investigates the underlying executive functions of a dual-tasking situation involving the simultaneous performance of decision making under explicit risk and a working memory task. It is suggested that making a decision and performing a working memory task at the same time should particularly require monitoring—an executive control process supervising behavior and the state of processing on two tasks. To test the role of a supervisory/monitoring function in such a dual-tasking situation we investigated 122 participants with the Game of Dice Task plus 2-back task (GDT plus 2-back task). This dual task requires participants to make decisions under risk and to perform a 2-back working memory task at the same time. Furthermore, a task measuring a set of several executive functions gathered in the term concept formation (Modified Card Sorting Test, MCST) and the newly developed Balanced Switching Task (BST), measuring monitoring in particular, were used. The results demonstrate that concept formation and monitoring are involved in the simultaneous performance of decision making under risk and a working memory task. In particular, the mediation analysis revealed that BST performance partially mediates the influence of MCST performance on the GDT plus 2-back task. These findings suggest that monitoring is one important subfunction for superior performance in a dual-tasking situation including decision making under risk and a working memory task. PMID:25741308

  12. Psychological contract in the light of flexible employment: The review of studies

    Directory of Open Access Journals (Sweden)

    Dorota Żołnierczyk-Zreda

    2016-08-01

    Full Text Available Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers’ disadvantage, as well as more transactional in their nature than those of permanent workers. The temporary workers’ well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4:529–536

  13. The psychological contract: is the UK National Health Service a model employer?

    Science.gov (United States)

    Fielden, Sandra; Whiting, Fiona

    2007-05-01

    The UK National Health Service (NHS) is facing recruitment challenges that mean it will need to become an 'employer of choice' if it is to continue to attract high-quality employees. This paper reports the findings from a study focusing on allied health professional staff (n = 67), aimed at establishing the expectations of the NHS inherent in their current psychological contract and to consider whether the government's drive to make the NHS a model employer meets those expectations. The findings show that the most important aspects of the psychological contract were relational and based on the investment made in the employment relationship by both parties. The employment relationship was one of high involvement but also one where transactional contract items, such as pay, were still of some importance. Although the degree of employee satisfaction with the relational content of the psychological contract was relatively positive, there was, nevertheless, a mismatch between levels of importance placed on such aspects of the contract and levels of satisfaction, with employees increasingly placing greater emphasis on those items the NHS is having the greatest difficulty providing. Despite this apparent disparity between employee expectation and the fulfilment of those expectations, the overall health of the psychological contract was still high.

  14. Adjudication and Aribitrability of Government Construction Contracts ...

    African Journals Online (AJOL)

    The former laws apply where a private individual or company usually referred to as 'employer' (otherwise known as 'owner' or 'client') enters into a construction contract with a contractor. And the latter involves a government department which intends to have construction works carried out on behalf of the government for ...

  15. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  16. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  17. Heterogeneous agents and decison making within firms

    NARCIS (Netherlands)

    Hung, Chung-yu

    2015-01-01

    This dissertation explores the implications of agents’ heterogeneity in decision making within situations where information is not completely contractible. Specifically, the study applies empirical methods across three chapters to examine the role of employees’ traits and their mutual relationships

  18. A supply chain contract with flexibility as a risk-sharing mechanism for demand forecasting

    Science.gov (United States)

    Kim, Whan-Seon

    2013-06-01

    Demand forecasting is one of the main causes of the bullwhip effect in a supply chain. As a countermeasure for demand uncertainty as well as a risk-sharing mechanism for demand forecasting in a supply chain, this article studies a bilateral contract with order quantity flexibility. Under the contract, the buyer places orders in advance for the predetermined horizons and makes minimum purchase commitments. The supplier, in return, provides the buyer with the flexibility to adjust the order quantities later, according to the most updated demand information. To conduct comparative simulations, four-echelon supply chain models, that employ the contracts and different forecasting techniques under dynamic market demands, are developed. The simulation outcomes show that demand fluctuation can be effectively absorbed by the contract scheme, which enables better inventory management and customer service. Furthermore, it has been verified that the contract scheme under study plays a role as an effective coordination mechanism in a decentralised supply chain.

  19. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  20. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  1. Contracts, Performance Measurement and Accountability in the Public Sector

    DEFF Research Database (Denmark)

    Drewry, Gavin; Greve, Carsten; Tanquerel, Thierry

    This book addresses issues to do with public accountability, audit and performance measurement that are both highly topical and of crucial importance to the theory and practice of public administration in an era of contractualized public management. The literature on public sector contracting...... of audit and accountability in a variety of countries and contexts; the third part offers some wider, cross-cutting perspectives. Based on the work of the EGPA permanent study group on the history of contractualization, Contracts, Performance Measurement and Accountability in the Public Sector draws upon...... - covering both 'hard' agreements (ones that are legally enforceable) and 'soft' agreements (enforced by negotiation and mutual trust) - has been growing for some time and the present book adds a primarily European perspective on contracting, performance-based management and accountability. One important...

  2. Contract portfolio optimization for a gasoline supply chain

    Science.gov (United States)

    Wang, Shanshan

    Major oil companies sell gasoline through three channels of trade: branded (associated with long-term contracts), unbranded (associated with short-term contracts), and spot market. The branded channel provides them with a long-term secured and sustainable demand source, but requires an inflexible long-term commitment with demand and price risks. The unbranded channel provides a medium level of allocation flexibility. The spot market provides them with the greatest allocation flexibility to the changing market conditions, but the spot market's illiquidity mitigates this benefit. In order to sell the product in a profitable and sustainable way, they need an optimal contract portfolio. This dissertation addresses the contract portfolio optimization problem from different perspectives (retrospective view and forward-looking view) at different levels (strategic level, tactical level and operational level). The objective of the retrospective operational model is to develop a financial case to estimate the business value of having a dynamic optimization model and quantify the opportunity values missed in the past. This model proves the financial significance of the problem and provides top management valuable insights into the business. BP has applied the insights and principles gained from this work and implemented the model to the entire Midwest gasoline supply chain to retrospectively review optimization opportunities. The strategic model is the most parsimonious model that captures the essential economic tradeoffs among different contract types, to demonstrate the need for a contract portfolio and what drives the portfolio. We examine the properties of the optimal contract portfolio and provide a comparative statics analysis by changing the model parameters. As the strategic model encapsulates the business problem at the macroscopic level, the tactical model resolves lower level issues. It considers the time dynamics, the information flow and contracting flow. Using

  3. 48 CFR 216.505-70 - Orders under multiple award contracts.

    Science.gov (United States)

    2010-10-01

    ... under each order as one of the factors in the selection decision; and (4) The contracting officer should... statute expressly authorizes or requires that the purchase be made from a specified source; or (2) One of... the intent to make the purchase, including a description of the supplies to be delivered or the...

  4. In vitro contraction of cytokinetic ring depends on myosin II but not on actin dynamics.

    Science.gov (United States)

    Mishra, Mithilesh; Kashiwazaki, Jun; Takagi, Tomoko; Srinivasan, Ramanujam; Huang, Yinyi; Balasubramanian, Mohan K; Mabuchi, Issei

    2013-07-01

    Cytokinesis in many eukaryotes involves the contraction of an actomyosin-based contractile ring. However, the detailed mechanism of contractile ring contraction is not fully understood. Here, we establish an experimental system to study contraction of the ring to completion in vitro. We show that the contractile ring of permeabilized fission yeast cells undergoes rapid contraction in an ATP- and myosin-II-dependent manner in the absence of other cytoplasmic constituents. Surprisingly, neither actin polymerization nor its disassembly is required for contraction of the contractile ring, although addition of exogenous actin-crosslinking proteins blocks ring contraction. Using contractile rings generated from fission yeast cytokinesis mutants, we show that not all proteins required for assembly of the ring are required for its contraction in vitro. Our work provides the beginnings of the definition of a minimal contraction-competent cytokinetic ring apparatus.

  5. Sleep pattern and decision-making in physicians from mobile emergency care service with 12-h work schedules.

    Science.gov (United States)

    Castro, Eleni de Araújo Sales; de Almondes, Katie Moraes

    2018-06-01

    Shift work schedules are biological standpoint worse because compel the body to anticipate periods of wakefulness and sleep and thus eventually cause a disruption of biological rhythms. The objective of this study is to evaluate the sleep pattern and decision-making in physicians working in mobile units of emergency attention undergoing day shift and rotating shift. The study included 26 physicians. The instruments utilized were a sociodemographic questionnaire, the Pittsburgh Sleep Quality Index, the Sleep Habits Questionnaire, the Epworth Sleepiness Scale and Chronotype Identification Questionnaire of Horne-Ostberg, the Iowa Gambling Task (IGT) and hypothetical scenarios of decision-making created according to the Policy-Capturing Technique. For inclusion and exclusion criteria, the participants answered the Chalder Fatigue Scale, the Beck Anxiety Inventory, the Beck Depression Inventory and the Inventory of Stress Symptoms for adults of Lipp. It was found good sleep quality for physicians on day shift schedule and bad sleep quality for physicians on rotating shift schedule. The IGT measure showed no impairment in decision-making, but the hypothetical scenarios revealed impairment decision-making during the shift for both schedules. Good sleep quality was related to a better performance in decision-making. Good sleep quality seems to influence a better performance in decision-making.

  6. Electricity market risk management using forward contracts with bilateral options

    International Nuclear Information System (INIS)

    Chung, T.S.; Yu, C.W.; Wong, K.P.; Zhang, S.H.

    2003-01-01

    Extreme short-term price volatility in competitive electricity markets creates the need for risk management arrangements. A new electricity forward contract with bilateral financial options is introduced, which allows both seller and buyer to take advantage of flexibility in generation and consumption to obtain monetary benefits while simultaneously removing the risk of market price fluctuations. The option theory is incorporated to formulate the contract price. The strike prices of options are derived from solving an equilibrium model in which both the buyer and the seller aim to maximise their own profit. Theoretical analysis shows that the proposed optional forward contract presents a more equitable and reasonable payoff structure that allows the buyer and seller to earn a larger overall expected benefit, and the contractual arrangement supports efficiency in economic dispatch of electricity production and consumption. The insights obtained from these results will be helpful to participants in the contractual decision-making process. (Author)

  7. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  8. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  9. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  10. Performance contracting to engage detoxification-only patients into continued rehabilitation.

    Science.gov (United States)

    Haley, Sean J; Dugosh, Karen Leggett; Lynch, Kevin G

    2011-03-01

    In 2006, only 18.7% of Delaware's detoxification patients were admitted to continuing recovery-oriented treatment within 30 days after discharge. In response, Delaware established financial contingencies to (1) maintain 90% detoxification occupancy, (2) make receipt of 10% of the facility's monthly reimbursement contingent on 25% of patients entering treatment, and (3) provide a $500 bonus for every patient with three or more prior detoxification visits who was retained in treatment. Under the performance contract, the detoxification provider (1) maintained the 90% occupancy requirement, (2) achieved the 25% treatment entry target for 7 of 12 months, and (3) observed only 8% (27/337) of detoxification completions that met the targeted length of stay. Continuation to and retention in treatment was even more constrained for patients with three or more prior detoxifications. Contrary to the policy intent, the number of patients with three or more detoxifications in fiscal year (FY) 2008 is nearly triple that of FY 2006. The modest gain in the transition rate was achieved without changes in patient access; the FY 2008 patient population reported significantly higher rates of homelessness and a younger age of first use than before the performance contract in FY 2006. Performance contracting may offer promise for improving transition to treatment rates. However, the unique needs of detoxification patients, the treatment capacity of each level of care to meet patient needs, and the structure of the performance contract must be carefully considered. Performance contracting efforts may be strengthened when service contracts across the system are tightly synchronized. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. The contracting risks of nuclear power engineering and the risk management strategies

    International Nuclear Information System (INIS)

    Ding Shuying

    2010-01-01

    With the trend of professional operation on the nuclear power engineering (thereafter using NPE for short) construction, the companies specialized on NPE whole-contracting are established one after the other, the mode of NPE whole-contracting has been wide adopted domestically. As people always concern for the safety of nuclear power, the risks exposed to NPE contractors are also concerned with the operator, the NPE corporations and the society. Therefore, it is very meaningful to analyze on the risks exposed to NPE contractors and the strategies they should take, for it not only determines whether the NPE construction will be finished on time, but also related to sustainable development of the NPE contracting corporations. The main content of this paper includes the analysis on the features and advantages of NPE whole contracting, the major NPE contracting risks, such as nuclear safety risks, strategic risks, market risks, legal risks, financial risks and operation risks, and the strategies to prevent or to control these risks. The paper focuses on identifying those business processes which risks may frequently take place, and how to manage them, illustrating practice cases to explain the theory, in order to make reference to NPE corporations. (author)

  12. Flexible forms of working hours

    OpenAIRE

    Knapp, Viktor

    2017-01-01

    66 Abstract - Flexible forms of working hours This diploma thesis deals with the flexible forms of working hours and its goal is to describe this issue in intelligible and comprehensive way. It is being very interesting and current theme which is to a great extent not subject to direct legal regulations and provides its contracting parties with a big amount of freedom of contract. This fact assists in bigger flexibilization of labour market and represents a significant instrument in the fight...

  13. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  14. Why haven’t weather derivatives been more successful as futures contracts? A case study

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2015-10-01

    Full Text Available Why have some seemingly promising futures contracts not succeeded in the recent past? In this paper, we examine one such example, the weather derivatives market. In two companion working papers, we also analyze two other futures market failures: namely, in the pulp market and in the uranium market. The structure of this paper is as follows. First we provide a brief history of weather derivatives contracts as well as a description of these contracts. Next we review customized over-the-counter (OTC weather derivatives contracts, as provided by reinsurers, and then we review why futures contracts are not as successful a method of risk transfer. Lastly we describe how weather exposures do not sufficiently match up against the criteria for the successful launch of a futures contract

  15. Second-Class Citizen? Contract Workers' Perceived Status, Dual Commitment and Intent to Quit

    Science.gov (United States)

    Boswell, Wendy R.; Watkins, Maria Baskerville; Triana, Maria del Carmen; Zardkoohi, Asghar; Ren, Run; Umphress, Elizabeth E.

    2012-01-01

    Outsourcing of jobs to contract workers who work alongside a client's employees has changed the human resource landscape of many organizations. In this study we examine how a contract worker's perceived employment status similarity to the client's own standard employees influences his/her affective commitment to both the client and the employer…

  16. How Critical Thinking Shapes the Military Decision Making Process

    Science.gov (United States)

    2004-05-17

    emotional rebuttal. Conversely, people cannot make good rational decisions without at least a twinge of emotion attached to the decision . 2) Our minds... decision they make . If emotions overwhelm reason, then decisions should be postponed.27 Service biases are one of the strongest emotional bias. Any...FINAL 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE How Critical Thinking Shapes the Military Decision Making Process 5a. CONTRACT

  17. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  18. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  19. Pricing of contract options for electric power; Precificacao de contrato de opcoes de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Leticia; Gunn, Laura Keiko; Correia, Paulo B. [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia

    2008-07-01

    The reorganization of the electric sector has improved the opportunity of energy trade through contracts, which have to be considered on the risk evaluation for generating companies. Different types of contracts have been used in electric energy commercialization. This work develops a model for option contract pricing. The classic model of options pricing used in the financial market is based in Black- Scholes. Due to the inherent feature of the Brazilian electrical system, with a strong predominance of hydroelectricity, the seasonal swing of the electricity price is the main source of contractual risk. So, the Black-Scholes model very is not adjusted. To deal with the uncertainties, this work uses an approach based on analysis of scenarios and binomial trees. Case studies are analyzed with binomial tree to calculate the price of the option contract. (author)

  20. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.