WorldWideScience

Sample records for major thoroughfare plan

  1. THE MORPHOLOGY OF TÂRNAVA MARE CORRIDOR AND IT’S CONDITIONING ON THE SETTLEMENTS AND THOROUGHFARES PLANNING (COPŞA MICĂ – BLAJ SECTOR

    Gheorghe ROŞIAN

    2011-04-01

    Full Text Available Settlements and thoroughfares positioning in hilly terrains, fragmented by valleys, as in the Târnava Mare Corridor case, is influenced by the value of morphological parameters. The variety of the relief, as extension and altitude, determines a specific distribution of the resources offered by the other geographic components. This directs to the anthropic component adaptation to local conditions, action expressed by capitalizing the favorable areas and avoiding the restrictive ones.

  2. Major planning enquiries

    Shore, P

    1978-11-01

    This is a speech delivered by the U.K. Secretary of State for the Environment in Manchester (UK) on September 13th 1978. It outlines the Minister's views on the role and significance of major planning inquiries - such as that proposed to be held on the Commercial Demonstration Fast Reactor. (CDFR) (author).

  3. 15 CFR 265.21 - Improper use of roads as thoroughfares.

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Improper use of roads as thoroughfares... § 265.21 Improper use of roads as thoroughfares. Except as otherwise provided herein, no person shall drive a motor vehicle or bicycle onto the site for the sole purpose of using the roads of the site as a...

  4. Quality planning for major plant design modifications

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  5. Major issues on establishing an emergency plan in nuclear facilities

    Chen, Zhu-zhou

    1988-03-01

    Several major issues on emergency planning and preparation in nuclear facilities were discussed -- such as the importance of emergency planning and preparation, basic principles of intervention and implementation of emergency plan and emergency training and drills to insure the effectiveness of the emergency plan. It is emphasized that the major key point of emergency planning and response is to avoid the occurrence of serious nonrandom effect. 12 refs., 3 tabs

  6. 78 FR 54949 - Major Project Financial Plan Guidance

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  7. Developments in the strategic planning of the major oil companies

    Jenkins, Gilbert

    2000-01-01

    This paper focuses on the changes in strategic planning of the major oil companies since the 1970s, and considers the reorganisations of the companies, and upstream and downstream planning. New directions for the major companies downstream operation in the retail and aviation sectors, and the influence of the BP/AMOCO/ARCO/BURMAH, EXXON/MOBIL and TOTAL/FINA/ELF mergers on the international oil industry are explored. Tables illustrating the earnings of the major oil companies for upstream and downstream operations, and chemicals in 1999, and for BP UK exploration and production, and refining and marketing profits (quarterly) for 1983-2000 are presented

  8. Strategic planning among the oil and gas major

    Grant, R.M.

    1998-01-01

    The increased focus on profitability and shareholder return, the impossibility of forecasting and the increased need for flexibility have made the strategic planning processes of the oil majors to change considerably in the past decade. While shifting from control to co-ordination, strategic planning has been acting less as a guidance and more as a mechanism for improving the quality of strategic decision-making [it

  9. Family planning: a major public health programme in India.

    Datta, S

    1968-01-01

    India's increase of 12 million people each year nullifies almost all the considerable progress the country made in agriculture and industrial production during 19 years of her freedom. Today she ranks 2nd in population and 7th in land area of the world. She claims 15% of the world's population, on about 2.4% of the world's land area. The Government of India has taken family planning as a major national health program under her Five-Year Plans, but impact of this program is not felt as yet. Since this is a difficult complex problem with many facets, it has to be attacked forcefully, drastically, and on all fronts. An all-out war has to be waged against the population growth. India should attack it with all the weapons she had: education, propaganda, taxation, legalization of abortion, and even compulsory sterilization. Overnight change in the fertility pattern of the people is impossible.

  10. National response plan - Major nuclear or radiological accidents

    2014-02-01

    France has been implementing stringent radiation protection and nuclear safety and security measures for many years. However, this does not mean that the country is exempt from having to be prepared to deal with an emergency. Changes in France, Europe and other parts of the globe have made it necessary for France to reconsider how it responds to nuclear and radiological emergencies. As the potential impact of a nuclear or radiological accident can affect a wide range of activities, the plan described herein is based on a cross-sector and inter-ministerial approach to emergency response. The Chernobyl and Fukushima-Daiichi disasters are proof that the consequences of a major nuclear or radiological accident can affect all levels of society. These challenges are substantial and relate to: public health: An uncontrolled nuclear accident can have immediate consequences (death, injury, irradiation) as well as long-term consequences that can lead to increased risk of developing radiation-induced diseases (such as certain types of cancer); environmental quality: Radiation contamination can last for several decades and, in some cases, can result in an area being closed off permanently to the public; economic and social continuity: Nuclear accidents bring human activity to a halt in contaminated areas, disrupting the economic and social order of the entire country. It may therefore be necessary to adapt economic and social systems and carry out clean-up operations if people and businesses have been displaced; quality of international relations: Related to fulfillment of obligations to alert and inform European and international partners. This international dimension also covers the protection of French nationals present in countries stricken by a nuclear accident. This national plan provides reference information on how to prepare for a nuclear or radiological emergency and make the appropriate decisions in the event of an emergency. It covers the emergency phase (including

  11. Developing "Green" Business Plans: Using Entrepreneurship to Teach Science to Business Administration Majors and Business to Biology Majors

    Letovsky, Robert; Banschbach, Valerie S.

    2011-01-01

    Biology majors team with business administration majors to develop proposals for "green" enterprise for a business plan competition. The course begins with a series of student presentations so that science students learn about the fundamentals of business, and business students learn about environmental biology. Then mixed biology-business student…

  12. Science and technology planning in LDCs: major policy issues

    Wionczek, M S

    1979-05-01

    Science in the less-developed countries (LDCs) should be underplanned rather than overplanned. Furthermore, the planning should be directed to the outer fringes of the scientific endeavor and to its infrastructure and not to the substance of scientific research itself. Planning of applied research and technological development in the LDC is another story. It cannot be done without entering into the substantive problems of applied research and technological development. Attempts to set the broad overall national targets for science and technology (S and T) expenditures -in terms of the proportion of the (GNP) or the per capita income- which do not consider the science and technology system's financial and human resources absorption capacity, are useless. 8 references.

  13. Expectant management of PPROM and major complications before planned delivery

    Bendix, J M; Hegaard, H K; Bergholt, T

    2015-01-01

    Women with pre-term pre-labour rupture of membranes (PPROM) 22-33 weeks' gestation were included in a retrospective cohort study with a structured audit to identify risk factors of major complications following PPROM and to assess whether these complications are predictable. Of the 234 women...

  14. Financial planning for major initiatives: a framework for success.

    Harris, John M

    2007-11-01

    A solid framework for assessing a major strategic initiative consists of four broad steps: Initial considerations, including level of analysis required and resources that will be brought to bear. Preliminary financial estimates for board approval to further assess the initiative. Assessment of potential partners' interest in the project. Feasibility analysis for board green light.

  15. Planning on a regional basis for a major radiation accident

    Casey, W.R.

    1981-01-01

    As a part of the Radiological Assistance Program, members of the Safety and Environmental Protection Division of Brookhaven National Laboratory have served as a response team for many years to the northeastern section of the United States. During this time, responses have been made to several significant incidents, including the accident at Three Mile Island. The planning and preparation for emergency response activities will be discussed. Included will be a review of instrument requirements, analytical and support equipment, modes of response, and communication needs. Interaction with and support from other response teams will be discussed. In particular, the lessons from the respone to Three Mile Island will be reviewed

  16. Prevention of Major Accident Hazards (MAHs) in major Hazard Installation (MHI) premises via land use planning (LUP): a review

    Khudbiddin, M. Q.; Rashid, Z. A.; Yeong, A. F. M. S.; Alias, A. B.; Irfan, M. F.; Fuad, M.; Hayati, H.

    2018-03-01

    For a number of years, there is a concern about the causes of major hazards, their identification, risk assessment and the process of its management from the global perspective on the activities of the industries due to the protection of the environment, human and property. Though, industries cannot take pleasure in their business by harming the nature of the land, there are a number of measures that need to be put into consideration by the industries. Such measures are in terms of management and safety for the businesses, lives, properties, as well as the environment. The lack of consideration in the selected appropriate criteria can result in major accidental hazards (MAHs). This paper will review the land use planning (LUP) methods used in the past and present to prevent major accident hazards at major hazard installation (MHI).

  17. Risk assessment of major hazards and its application in urban planning: a case study.

    Zhou, Yafei; Liu, Mao

    2012-03-01

    With the rapid development of industry in China, the number of establishments that are proposed or under construction is increasing year by year, and many are industries that handle flammable, explosive, toxic, harmful, and dangerous substances. Accidents such as fire, explosion, and toxic diffusion inevitably happen. Accidents resulting from these major hazards in cities cause a large number of casualties and property losses. It is increasingly important to analyze the risk of major hazards in cities realistically and to suitably plan and utilize the surrounding land based on the risk analysis results, thereby reducing the hazards. A theoretical system for risk assessment of major hazards in cities is proposed in this article, and the major hazard risk for the entire city is analyzed quantitatively. Risks of various major accidents are considered together, superposition effect is analyzed, individual risk contours of the entire city are drawn out, and the level of risk in the city is assessed using "as low as reasonably practicable" guidelines. After the entire city's individual risk distribution is obtained, risk zones are divided according to corresponding individual risk value of HSE, and land-use planning suggestions are proposed. Finally, a city in China is used as an example to illustrate the risk assessment process of the city's major hazard and its application in urban land-use planning. The proposed method has a certain theoretical and practical significance in establishing and improving risk analysis of major hazard and urban land-use planning. On the one hand, major urban public risk is avoided; further, the land is utilized in the best possible way in order to obtain the maximum benefit from its use. © 2011 Society for Risk Analysis.

  18. Engaged in Debate: Major Albert C. Wedemeyer and the 1941 Victory Plan in Historical Memory

    2017-05-25

    motorization . During this time, the US Army transformed from the paradigmatic square infantry division to the smaller, more mobile, and more powerful...Mobilization Plan (IMP) to inform mobilization and gain strategic flexibility in the event of a major war.33...Concept of Operations The competing historical narratives cast Wedemeyer’s strategic concept as either the work of unparalleled genius, per Watson

  19. Development and improvement implementation on radioprotection in industrial radiography works at thoroughfares or urban and rural areas

    Teixeira, Pedro Barbosa; Aquino, Josilto Oliveira de; Souza, Luiz Antonio C. de; Costa, Evaldo Luiz Correa da

    1999-01-01

    Treating of areas with access of the population and being known that some of these works should be accomplished in emergency character (maximum period of 24 hours), it's necessary the adaptation of the norms of radiation protection in the country, with elaboration of specific rules, which were condensed in a standard document named Plan of restrict Areas with Specific Authorization (PARAE). We believe that the document at issue (PARAE), it could serve as parameter to other countries having in mind that its application has caused an improvement in the radiation protection of the enterprises in the country, producing an increase of quality in the area of radiation protection, so much in the execution of the tasks as in personnel formation, as well as in the own control accomplished by the Regulatory Authority. (author)

  20. Regional coordination in medical emergencies and major incidents; plan, execute and teach

    Hedelin Annika

    2009-07-01

    Full Text Available Abstract Background Although disasters and major incidents are difficult to predict, the results can be mitigated through planning, training and coordinated management of available resources. Following a fire in a disco in Gothenburg, causing 63 deaths and over 200 casualties, a medical disaster response centre was created. The center was given the task to coordinate risk assessments, disaster planning and training of staff within the region and on an executive level, to be the point of contact (POC with authority to act as "gold control," i.e. to take immediate strategic command over all medical resources within the region if needed. The aim of this study was to find out if the centre had achieved its tasks by analyzing its activities. Methods All details concerning alerts of the regional POC was entered a web-based log by the duty officer. The data registered in this database was analyzed during a 3-year period. Results There was an increase in number of alerts between 2006 and 2008, which resulted in 6293 activities including risk assessments and 4473 contacts with major institutions or key persons to coordinate or initiate actions. Eighty five percent of the missions were completed within 24 h. Twenty eight exercises were performed of which 4 lasted more than 24 h. The centre also offered 145 courses in disaster and emergency medicine and crisis communication. Conclusion The data presented in this study indicates that the center had achieved its primary tasks. Such regional organization with executive, planning, teaching and training responsibilities offers possibilities for planning, teaching and training disaster medicine by giving immediate feed-back based on real incidents.

  1. Women planning to major in computer science: Who are they and what makes them unique?

    Lehman, Kathleen J.; Sax, Linda J.; Zimmerman, Hilary B.

    2016-12-01

    Despite the current growing popularity of the computer science (CS) major, women remain sorely underrepresented in the field, continuing to earn only 18% of bachelor's degrees. Understanding women's low rates of participation in CS is important given that the demand for individuals with CS training has grown sharply in recent years. Attracting and retaining more women to high-paying fields like CS may also help narrow the gender pay gap. Further, it is important that women participate in developing new technology so that technology advances serve the needs of both women and men. This paper explores the background characteristics, career aspirations, and self-perceptions of 1636 female first-year college students in the United States who intend to major in CS and compares them with 4402 male CS aspirants as well as with 26,642 women planning to major in other STEM sub-fields. The findings reveal a unique profile of women who pursue the CS major and notes many significant differences between men and women in CS and between women in CS and those in other STEM fields. For instance, women in CS tend to earn lower high school grades than women in other STEM fields, but earn higher SAT verbal scores. They also rate themselves higher than men in CS and women in other STEM fields on measures of their artistic ability, but rate themselves lower on other self-ratings, including academic and leadership ability. Further, women in CS are more likely to be undecided in their career plans than men in CS and women in other STEM fields. Understanding the unique characteristics of women in CS will help inform policies and recruitment programs designed to address the gender gap in computing.

  2. The Fusion Science Research Plan for the Major U.S. Tokamaks. Advisory report

    1996-01-01

    In summary, the community has developed a research plan for the major tokamak facilities that will produce impressive scientific benefits over the next two years. The plan is well aligned with the new mission and goals of the restructured fusion energy sciences program recommended by FEAC. Budget increases for all three facilities will allow their programs to move forward in FY 1997, increasing their rate of scientific progress. With a shutdown deadline now established, the TFTR will forego all but a few critical upgrades and maximize operation to achieve a set of high-priority scientific objectives with deuterium-tritium plasmas. The DIII-D and Alcator C-Mod facilities will still fall well short of full utilization. Increasing the run time in vii DIII-D is recommended to increase the scientific output using its existing capabilities, even if scheduled upgrades must be further delayed. An increase in the Alcator C-Mod budget is recommended, at the expense of equal and modest reductions (~1%) in the other two facilities if necessary, to develop its capabilities for the long-term and increase its near-term scientific output.

  3. National plan of response to a major nuclear or radiological accident

    2014-02-01

    The first part of this document presents the response strategies and principles to be applied in the case of a major nuclear or radiological accident. It presents the general framework and the 8 reference situations which are used as references for the plan. It presents the general organisation of crisis management by the State (initial organisation, organisation at the national level, communication channel, international channels, case of transport of radioactive materials, responsibility of the various actors). Then, it presents the strategies of response, i.e., a global strategy and more specific strategies applicable in different sectors or fields: for the control of the concerned installation or transport, in the case of transport of radioactive materials, for the protection of the population, for the taking into care, for communication, for the continuity of social and economic life, at the European level, for the post-accidental management. The second part is a guide which contains sheets describing reactions in different situations: uncertainty, accident in an installation resulting in an either immediate and short, or immediate and long, or delayed and long release, accident in a transport of radioactive materials with potential release, accident occurring abroad which may have a more or less significant impact in France, and accident at sea

  4. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  5. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  6. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  7. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    Oliver, H.W. [Geological Survey, Menlo Park, CA (USA); Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA); Nelson, P.H. [Geological Survey, Denver, CO (USA)] [eds.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs.

  8. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    Oliver, H.W.; Hardin, E.L.; Nelson, P.H.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs

  9. Visuospatial planning in unmedicated major depressive disorder and bipolar disorder : distinct and common neural correlates

    Rive, M. M.; Koeter, M. W. J.; Veltman, D. J.; Schene, A. H.; Ruhe, H. G.

    Background Cognitive impairments are an important feature of both remitted and depressed major depressive disorder (MDD) and bipolar disorder (BD). In particular, deficits in executive functioning may hamper everyday functioning. Identifying the neural substrates of impaired executive functioning

  10. Lessons learned in planning ALARA/health physics support for major nuclear power plant outages

    Gilman, T.R.; Lesinski, M.L.

    1987-01-01

    Although as low as reasonably achievable (ALARA)/health physics is viewed as necessary support for nuclear power plant outage work, it can be the last area to which attention is given in preparing for a large-scope outage. Inadequate lead times cause last-minute preparations resulting in delays in planned work. The Dresden Unit 3 Recirculation Piping Replacement Project is examined from a planning viewpoint. The attention that was given the various areas of a comprehensive ALARA/health physics program is examined, and approximate recommended lead times are discussed. The discussion will follow a chronological path from project inception to the beginning stages of outage work. Initially, the scope of work needs to be assessed by individuals familiar with similar projects of equivalent magnitude. Those individuals need to be health physics professionals who understand the particular utility and/or the site's way of doing business. They should also possess a good understanding of preferred industry practices

  11. IT Infrastructure Planning from a North Denmark Perspective: Major Problems, Consequences and Possible Solutions

    Knudsen, Thomas Phillip; Madsen, Ole Brun

    2004-01-01

    are proposed. These problems appear on the background of a dawning understanding of IT infrastructure as a crucial part of the modern society comparable to the recognised infrastructures, such as roads and electricity. The IT-infrastructure and the problems are placed in the context of the growing importance......This paper gives an overview of the more prominent problems in IT infrastructure evolution and in particular the neccessary planning process in Denmark. A discussion of consequences and possible solutions is presented. Through the DDN-project Nordjysk Netforum, NJNF, and its partners and attendant...... research at Aalborg University, AAU, it has become apparent that several problems pose significant hindrances to an efficient IT-infrastructrure planning and implementation. These problems range form awareness of IT-infrastructure issues, over education and research to main cause and possible solutions...

  12. IT infrastructure planning from a North Denmark perspective: Major problems, consequences and possible solutions

    Madsen, Ole Brun; Knudsen, Thomas Phillip

    are proposed. These problems appear on the background of a dawning understanding of IT infrastructure as a crucial part of the modern society comparable to the recognised infrastructures, such as roads and electricity. The IT-infrastructure and the problems are placed in the context of the growing importance......This paper gives an overview of the more prominent problems in IT infrastructure evolution and in particular the neccessary planning process in Denmark. A discussion of consequences and possible solutions is presented. Through the DDN-project Nordjysk Netforum, NJNF, and its partners and attendant...... research at Aalborg University, AAU, it has become apparent that several problems pose significant hindrances to an efficient IT-infrastructrure planning and implementation. These problems range form awareness of IT-infrastructure issues, over education and research to main cause and possible solutions...

  13. Succession planning and staff retention challenges: An industrial outlook and major risks

    Sindisiwe Bonisile Maphisa

    2017-07-01

    Full Text Available The sugar manufacturing industry in the emerging economy is potentially at high risk of not achieving its goals of increasing production output. This is due to higher than average age of growers, nonexistence of effective succession planning to expedite the transition to a new generation of growers, related increasing departure of farmers from the industry and difficulty in attracting new talent to the industry due to the high cost of entry. This research sought to explore managements’ perceptions of succession planning and the impact it has on retention at a Sugar Manufacturing Company. In order to achieve the research aim and objectives, a qualitative approach was utilised in the form of an exploratory case study. A single case study was also chosen because this is a critical, unique and revelatory case and the researchers had access to the case previously inaccessible to empirical research. Purposive sampling was used and total of 15 managers participated in this study. The study found that the company is not doing enough to implement succession planning programmes even though there are potential candidates who can be trained and developed into management positions.

  14. The Event Chain of Survival in the Context of Music Festivals: A Framework for Improving Outcomes at Major Planned Events.

    Lund, Adam; Turris, Sheila

    2017-08-01

    Despite the best efforts of event producers and on-site medical teams, there are sometimes serious illnesses, life-threatening injuries, and fatalities related to music festival attendance. Producers, clinicians, and researchers are actively seeking ways to reduce the mortality and morbidity associated with these events. After analyzing the available literature on music festival health and safety, several major themes emerged. Principally, stakeholder groups planning in isolation from one another (ie, in silos) create fragmentation, gaps, and overlap in plans for major planned events (MPEs). The authors hypothesized that one approach to minimizing this fragmentation may be to create a framework to "connect the dots," or join together the many silos of professionals responsible for safety, security, health, and emergency planning at MPEs. Adapted from the well-established literature regarding the management of cardiac arrests, both in and out of hospital, the "chain of survival" concept is applied to the disparate groups providing services that support event safety in the context of music festivals. The authors propose this framework for describing, understanding, coordinating and planning around the integration of safety, security, health, and emergency service for events. The adapted Event Chain of Survival contains six interdependent links, including: (1) event producers; (2) police and security; (3) festival health; (4) on-site medical services; (5) ambulance services; and (6) off-site medical services. The authors argue that adapting and applying this framework in the context of MPEs in general, and music festivals specifically, has the potential to break down the current disconnected approach to event safety, security, health, and emergency planning. It offers a means of shifting the focus from a purely reactive stance to a more proactive, collaborative, and integrated approach. Improving health outcomes for music festival attendees, reducing gaps in planning

  15. Assessment of emergency response planning and implementation in the aftermath of major natural disasters and technological accidents

    Milligan, Patricia A.; Jones, Joseph; Walton, F.; Smith, J.D.

    2008-01-01

    Emergency planning around nuclear power plants represents some of the most mature and well developed emergency planning in the United States. Since the implementation of NUREG-0654 / FEMA-REP-1, Rev. 1, A Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (NRC, 1980a) the licensees, local, and State agencies have developed detailed Radiological Emergency Response Programs. An important component of these plans is the evacuation of the population in the event of a general emergency condition at the plant. In January 2005, the U.S. Nuclear Regulatory Commission (NRC) published the landmark report, 'Identification and Analysis of Factors Affecting Emergency Evacuations' (NUREG/CR 6864/), which represented the most comprehensive investigation of public evacuations in the United States in more than 15 years. Since the completion of this research, several high profile evacuations have occurred, including Hurricane Katrina in New Orleans, Hurricane Rita in Houston, as well as major wildfires across the western U.S. The NRC commissioned an update to its 2005 evacuation case study publication to evaluate the evacuation experience of the selected communities (e.g., timeliness, related injuries, hazard avoidance); the level of preplanning that was in place for the affected areas and extent that the pre planned requirements were implemented during the emergency response; the critical factors contributing to the efficiency of or impediments to the evacuations (e.g., training, drills, preparedness, experience, resources, facilities, and organizational structure); and additional factors that may have contributed to less than satisfactory public response (i.e., availability of personal transportation, use of public transportation, lack of availability of shelters, etc.). The comprehensive report will be published in fall of 2008 as NUREG/CR-6981, Assessment of Emergency Response Planning and

  16. Job search and the theory of planned behavior: Minority – majority group differences in The Netherlands

    E.A.J. van Hooft (Edwin); M.Ph. Born (Marise); T.W. Taris (Toon); H. van der Flier (Henk)

    2003-01-01

    textabstractThe labor market in many Western countries increasingly diversifies. However, little is known about job search behavior of 'non-traditional' applicants such as ethnic minorities. This study investigated minority – majority group differences in the predictors of job search behavior, using

  17. Creation of inpatient capacity during a major hospital relocation: lessons for disaster planning.

    Jen, Howard C; Shew, Stephen B; Atkinson, James B; Rosenthal, J Thomas; Hiatt, Jonathan R

    2009-09-01

    To identify tools to aid the creation of disaster surge capacity using a model of planned inpatient census reduction prior to relocation of a university hospital. Prospective analysis of hospital operations for 1-week periods beginning 2 weeks (baseline) and 1 week (transition) prior to move day; analysis of regional hospital and emergency department capacity. Large metropolitan university teaching hospital. Hospital census figures and patient outcomes. Census was reduced by 36% from 537 at baseline to 345 on move day, a rate of 18 patients/d (P emergency operations was unchanged. Hospital admissions were decreased by 42%, and the adjusted discharges per occupied bed were increased by 8% (both P capacity to absorb new patients was limited. During a period in which southern California population grew by 8.5%, acute care beds fell by 3.3%, while Los Angeles County emergency departments experienced a 13% diversion rate due to overcrowding. Local or regional disasters of any size can overwhelm the system's ability to respond. Our strategy produced a surge capacity of 36% without interruption of emergency department and trauma services but required 3 to 4 days for implementation, making it applicable to disasters and mass casualty events with longer lead times. These principles may aid in disaster preparedness and planning.

  18. Major Sports events in Brazil: from the expression of brazilian sports policy to the urban neodevelopmentalist planning concept

    Lino Castellani Filho

    2014-06-01

    Full Text Available We will seek some considerations about the major sports events in the Brazilian  territory as  the main expression of a particular logic of urban development and less of a sports policy itself, focusing on its impact in South America. In particular, we will focus on the paradox of the official discourse centered on the recognition of the Sport as Social Right and of a practice committed to the neodevelopmentalist conception of urban planning, ratifying its apprehension as a product likely to be commercialized having high appeal in the field of business.

  19. How major restaurant chains plan their menus: the role of profit, demand, and health.

    Glanz, Karen; Resnicow, Ken; Seymour, Jennifer; Hoy, Kathy; Stewart, Hayden; Lyons, Mark; Goldberg, Jeanne

    2007-05-01

    Increased away-from-home eating is associated with lower diet quality, and may contribute to the increasing prevalence of overweight and obesity. Healthier food choices in restaurants may help mitigate the rise in obesity and improve diet quality. This study sought to understand the views of executives at major U.S. restaurant chains regarding the process, motivation for, and challenges of offering healthier options on their menus. The Healthy Menu Study used in-depth structured telephone interviews with 41 senior menu development and marketing executives at leading casual dining and fast-food restaurant chains. The interview guide covered menu trends, influences on introduction and continuation of new menu items, and barriers to adding healthy foods. Data analysis included tabulation of responses, identification of themes, and examination of subgroup differences. Growing sales and increasing profits are the most important considerations, mentioned by 61% of respondents; health and nutrition were noted as important by 21%. Restaurants may try to avoid losing groups with a "health seeker" by offering healthier foods (low in fat and calories, more fruits and vegetables) (27% of chains), but operators believe demand for healthier foods is not widespread. Additional obstacles to including healthier menu items are short shelf life of produce (46%), increased preparation time, low sales, and high labor costs. Not surprisingly, profit margins are the primary determinants of why restaurants do or do not add and continue to serve healthier food options. Without an increase in consumer demand, it is unlikely the restaurant industry will increase their offering of healthy food choices. Insight into the restaurant industry perspective is important for developing promising strategies to encourage healthier eating patterns.

  20. Planning Major Curricular Change.

    Kirkland, Travis P.

    Decision-making and change models can take many forms. One researcher (Nordvall, 1982) has suggested five conceptual models for introducing change: a political model; a rational decision-making model; a social interaction decision model; the problem-solving method; and an adaptive/linkage model which is an amalgam of each of the other models.…

  1. Careful treatment planning enables safe ablation of liver tumors adjacent to major blood vessels by percutaneous irreversible electroporation (IRE).

    Kos, Bor; Voigt, Peter; Miklavcic, Damijan; Moche, Michael

    2015-09-01

    Irreversible electroporation (IRE) is a tissue ablation method, which relies on the phenomenon of electroporation. When cells are exposed to a sufficiently electric field, the plasma membrane is disrupted and cells undergo an apoptotic or necrotic cell death. Although heating effects are known IRE is considered as non-thermal ablation technique and is currently applied to treat tumors in locations where thermal ablation techniques are contraindicated. The manufacturer of the only commercially available pulse generator for IRE recommends a voltage-to-distance ratio of 1500 to 1700 V/cm for treating tumors in the liver. However, major blood vessels can influence the electric field distribution. We present a method for treatment planning of IRE which takes the influence of blood vessels on the electric field into account; this is illustrated on a treatment of 48-year-old patient with a metastasis near the remaining hepatic vein after a right side hemi-hepatectomy. Output of the numerical treatment planning method shows that a 19.9 cm3 irreversible electroporation lesion was generated and the whole tumor was covered with at least 900 V/cm. This compares well with the volume of the hypodense lesion seen in contrast enhanced CT images taken after the IRE treatment. A significant temperature raise occurs near the electrodes. However, the hepatic vein remains open after the treatment without evidence of tumor recurrence after 6 months. Treatment planning using accurate computer models was recognized as important for electrochemotherapy and irreversible electroporation. An important finding of this study was, that the surface of the electrodes heat up significantly. Therefore the clinical user should generally avoid placing the electrodes less than 4 mm away from risk structures when following recommendations of the manufacturer.

  2. An advance care plan decision support video before major surgery: a patient- and family-centred approach.

    Isenberg, Sarina R; Crossnohere, Norah L; Patel, Manali I; Conca-Cheng, Alison; Bridges, John F P; Swoboda, Sandy M; Smith, Thomas J; Pawlik, Timothy M; Weiss, Matthew; Volandes, Angelo E; Schuster, Anne; Miller, Judith A; Pastorini, Carolyn; Roter, Debra L; Aslakson, Rebecca A

    2018-06-01

    Video-based advanc care planning (ACP) tools have been studied in varied medical contexts; however, none have been developed for patients undergoing major surgery. Using a patient- and family-centredness approach, our objective was to implement human-centred design (HCD) to develop an ACP decision support video for patients and their family members when preparing for major surgery. The study investigators partnered with surgical patients and their family members, surgeons and other health professionals to design an ACP decision support video using key HCD principles. Adapting Maguire's HCD stages from computer science to the surgical context, while also incorporating Elwyn et al 's specifications for patient-oriented decision support tool development, we used a six-stage HCD process to develop the video: (1) plan HCD process; (2) specify where video will be used; (3) specify user and organisational requirements; (4) produce and test prototypes; (5) carry out user-based assessment; (6) field test with end users. Over 450 stakeholders were engaged in the development process contributing to setting objectives, applying for funding, providing feedback on the storyboard and iterations of the decision tool video. Throughout the HCD process, stakeholders' opinions were compiled and conflicting approaches negotiated resulting in a tool that addressed stakeholders' concerns. Our patient- and family-centred approach using HCD facilitated discussion and the ability to elicit and balance sometimes competing viewpoints. The early engagement of users and stakeholders throughout the development process may help to ensure tools address the stated needs of these individuals. NCT02489799. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  3. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    Bennett, Sophie; Kemp, Simon [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Hudson, Malcolm D., E-mail: mdh@soton.ac.uk [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Institute for Life Sciences, University of Southampton, SO17 1BJ (United Kingdom)

    2016-01-15

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  4. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    Bennett, Sophie; Kemp, Simon; Hudson, Malcolm D.

    2016-01-01

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  5. Integrated Logistics Support Plan (ILSP) for the Ports and Waterways Safety System (PAWSS) Project - A Level I Major Acquisition

    1997-09-30

    This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...

  6. Modeled Sea Level Rise Impacts on Coastal Ecosystems at Six Major Estuaries on Florida's Gulf Coast: Implications for Adaptation Planning.

    Geselbracht, Laura L; Freeman, Kathleen; Birch, Anne P; Brenner, Jorge; Gordon, Doria R

    2015-01-01

    The Sea Level Affecting Marshes Model (SLAMM) was applied at six major estuaries along Florida's Gulf Coast (Pensacola Bay, St. Andrews/Choctawhatchee Bays, Apalachicola Bay, Southern Big Bend, Tampa Bay and Charlotte Harbor) to provide quantitative and spatial information on how coastal ecosystems may change with sea level rise (SLR) and to identify how this information can be used to inform adaption planning. High resolution LiDAR-derived elevation data was utilized under three SLR scenarios: 0.7 m, 1 m and 2 m through the year 2100 and uncertainty analyses were conducted on selected input parameters at three sites. Results indicate that the extent, spatial orientation and relative composition of coastal ecosystems at the study areas may substantially change with SLR. Under the 1 m SLR scenario, total predicted impacts for all study areas indicate that coastal forest (-69,308 ha; -18%), undeveloped dry land (-28,444 ha; -2%) and tidal flat (-25,556 ha; -47%) will likely face the greatest loss in cover by the year 2100. The largest potential gains in cover were predicted for saltmarsh (+32,922 ha; +88%), transitional saltmarsh (+23,645 ha; na) and mangrove forest (+12,583 ha; +40%). The Charlotte Harbor and Tampa Bay study areas were predicted to experience the greatest net loss in coastal wetlands The uncertainty analyses revealed low to moderate changes in results when some numerical SLAMM input parameters were varied highlighting the value of collecting long-term sedimentation, accretion and erosion data to improve SLAMM precision. The changes predicted by SLAMM will affect exposure of adjacent human communities to coastal hazards and ecosystem functions potentially resulting in impacts to property values, infrastructure investment and insurance rates. The results and process presented here can be used as a guide for communities vulnerable to SLR to identify and prioritize adaptation strategies that slow and/or accommodate the changes underway.

  7. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  8. Strategic Planning Information Online: A Step-by-Step Guide through Major Checkpoints. . . What Database to Use When.

    Marsh, Sharon G.

    1984-01-01

    This article concentrates on the use of online searching to provide information needed by business for strategy formulation. The following steps are explained: environment analysis (structural analysis, trend analysis); business analysis; strategy formulation; strategic anticipation; strategic plan formalization; and implementation and control.…

  9. Measuring and managing radiologist workload: application of lean and constraint theories and production planning principles to planning radiology services in a major tertiary hospital.

    MacDonald, Sharyn L S; Cowan, Ian A; Floyd, Richard; Mackintosh, Stuart; Graham, Rob; Jenkins, Emma; Hamilton, Richard

    2013-10-01

    We describe how techniques traditionally used in the manufacturing industry (lean management, the theory of constraints and production planning) can be applied to planning radiology services to reduce the impact of constraints such as limited radiologist hours, and to subsequently reduce delays in accessing imaging and in report turnaround. Targets for imaging and reporting were set aligned with clinical needs. Capacity was quantified for each modality and for radiologists and recorded in activity lists. Demand was quantified and forecasting commenced based on historical referral rates. To try and mitigate the impact of radiologists as a constraint, lean management processes were applied to radiologist workflows. A production planning process was implemented. Outpatient waiting times to access imaging steadily decreased. Report turnaround times improved with the percentage of overnight/on-call reports completed by a 1030 target time increased from approximately 30% to 80 to 90%. The percentage of emergency and inpatient reports completed within one hour increased from approximately 15% to approximately 50% with 80 to 90% available within 4 hours. The number of unreported cases on the radiologist work-list at the end of the working day reduced. The average weekly accuracy for demand forecasts for emergency and inpatient CT, MRI and plain film imaging was 91%, 83% and 92% respectively. For outpatient CT, MRI and plain film imaging the accuracy was 60%, 55% and 77% respectively. Reliable routine weekly and medium to longer term service planning is now possible. Tools from industry can be successfully applied to diagnostic imaging services to improve performance. They allow an accurate understanding of the demands on a service, capacity, and can reliably predict the impact of changes in demand or capacity on service delivery. © 2013 The Royal Australian and New Zealand College of Radiologists.

  10. Value of a step-up diagnosis plan: CRP and CT-scan to diagnose and manage postoperative complications after major abdominal surgery

    Jennifer Straatman

    2014-12-01

    Full Text Available Postoperative complications frequently follow major abdominal surgery and are associated with increased morbidity and mortality. Early diagnosis and treatment of complications is associated with improved patient outcome. In this study we assessed the value of a step-up diagnosis plan by C-reactive protein and CT-scan (computed tomography-scan imaging for detection of postoperative complications following major abdominal surgery. An observational cohort study was conducted of 399 consecutive patients undergoing major abdominal surgery between January 2009 and January 2011. Indication for operation, type of surgery, postoperative morbidity, complications according to the Clavien-Dindo classification and mortality were recorded. Clinical parameters were recorded until 14 days postoperatively or until discharge. Regular C-reactive protein (CPR measurements in peripheral blood and on indication -enhanced CT-scans were performed. Eighty-three out of 399 (20.6 % patients developed a major complication in the postoperative course after a median of seven days (IQR 4-9 days. One hundred and thirty two patients received additional examination consisting of enhanced CT-scan imaging, and treatment by surgical reintervention or intensive care observation. CRP levels were significantly higher in patients with postoperative complications. On the second postoperative day CRP levels were on average 197.4 mg/L in the uncomplicated group, 220.9 mg/L in patients with a minor complication and 280.1 mg/L in patients with major complications (p < 0,001. CT-scan imaging showed a sensitivity of 91.7 % and specificity of 100 % in diagnosis of major complications. Based on clinical deterioration and the increase of CRP, an additional enhanced CT-scan offered clear discrimination between patients with major abdominal complications and uncomplicated patients. Adequate treatment could then be accomplished.

  11. Emergency planning and the Control of Major Accident Hazards (COMAH/Seveso II) Directive: An approach to determine the public safety zone for toxic cloud releases

    O'Mahony, Mary T.; Doolan, Donal; O'Sullivan, Alice; Hession, Michael

    2008-01-01

    The EU Control of Major Accidents Hazards Directive (Seveso II) requires an external emergency plan for each top tier site. This paper sets out a method to build the protection of public health into emergency planning for Seveso sites in the EU. The method involves the review of Seveso site details prescribed under the directive. The site safety report sets out the potential accident scenarios. The safety report's worst-case scenario, and chemical involved, is used as the basis for the external emergency plan. A decision was needed on the appropriate threshold value to use as the level of concern to protect public health. The definitions of the regulatory standards (air quality standards and occupational standards) in use were studied, how they are derived and for what purpose. The 10 min acute exposure guideline level (AEGL) for a chemical is recommended as the threshold value to inform decisions taken to protect public health from toxic cloud releases. The area delimited by AEGL 1 defines the population who may be concerned about being exposed. They need information based on comprehensive risk assessment. The area delimited by AEGL 2 defines the population for long-term surveillance when indicated and may include first responders. The area delimited by AEGL 3 defines the population who may present acutely to the medical services. It ensures that the emergency responders site themselves safely. A standard methodology facilitates discussions with plant operators and concerned public. Examples show how the methodology can be adapted to suit explosive risk and response to fire

  12. Analysis of the major factors of influence on the conditions of the intensity modulated radiation therapy planning optimization in head and neck

    Kim, Dae Sup; Yoon, In Ha; Lee, Woo Seok; Back, Geum Mun

    2014-01-01

    To derive the most appropriate factors by considering the effects of the major factors when applied to the optimization algorithm, thereby aiding the effective designing of a ideal treatment plan. The eclipse treatment planning system(Eclipse 10.0, Varian, USA) was used in this study. The PBC (Pencil Beam Convolution) algorithm was used for dose calculation, and the DVO (Dose Volume Optimizer 10.0.28) Optimization algorithm was used for intensity modulated radiation therapy. The experimental group consists of patients receiving intensity modulated radiation therapy for the head and neck cancer and dose prescription to two planned target volume was 2.2 Gy and 2.0 Gy simultaneously. Treatment plan was done with inverse dose calculation methods utilizing 6 MV beam and 7 fields. The optimal algorithm parameter of the established plan was selected based on volume dose-priority(Constrain), dose fluence smooth value and the impact of the treatment plan was analyzed according to the variation of each factors. Volume dose-priority determines the reference conditions and the optimization process was carried out under the condition using same ratio, but different absolute values. We evaluated the surrounding normal organs of treatment volume according to the changing conditions of the absolute values of the volume dose-priority. Dose fluence smooth value was applied by simply changing the reference conditions (absolute value) and by changing the related volume dose-priority. The treatment plan was evaluated using Conformal Index, Paddick's Conformal Index, Homogeneity Index and the average dose of each organs. When the volume dose-priority values were directly proportioned by changing the absolute values, the CI values were found to be different. However PCI was 1.299±0.006 and HI was 1.095±0.004 while D5%/D95% was 1.090±1.011. The impact on the prescribed dose were similar. The average dose of parotid gland decreased to 67.4, 50.3, 51.2, 47.1 Gy when the absolute

  13. Improving Prevention, Early Recognition and Management of Acute Kidney Injury after Major Surgery: Results of a Planning Meeting with Multidisciplinary Stakeholders

    Matthew T James

    2014-08-01

    Full Text Available Purpose of review: Acute kidney injury (AKI is common after major surgery, and is associated with morbidity, mortality, increased length of hospital stay, and high health care costs. Although recent guidelines for AKI provide recommendations for identification of patients at risk, monitoring, diagnosis, and management of AKI, there is lack of understanding to guide successful implementation of these recommendations into clinical practice. Sources of information: We held a planning meeting with multidisciplinary stakeholders to identify barriers, facilitators, and strategies to implement recommendations for prevention, early identification, and management of AKI after major surgery. Barriers and facilitators to knowledge use for peri-operative AKI prevention and care were discussed. Findings: Stakeholders identified barriers in knowledge (how to identify high-risk patients, what criteria to use for diagnosis of AKI, attitudes (self-efficacy in preventive care and management of AKI, and behaviors (common use of diuretics, non-steroidal anti-inflammatory drugs, withholding of intravenous fluids, and competing time demands in peri-operative care. Educational, informatics, and organizational interventions were identified by stakeholders as potentially useful elements for future interventions for peri-operative AKI. Limitation: Meeting participants were from a single centre. Implications: The information and recommendations obtained from this stakeholder's meeting will be useful to design interventions to improve prevention and early care for AKI after major surgery.

  14. Effect of Loading Dose of Atorvastatin Prior to Planned Percutaneous Coronary Intervention on Major Adverse Cardiovascular Events in Acute Coronary Syndrome: The SECURE-PCI Randomized Clinical Trial.

    Berwanger, Otavio; Santucci, Eliana Vieira; de Barros E Silva, Pedro Gabriel Melo; Jesuíno, Isabella de Andrade; Damiani, Lucas Petri; Barbosa, Lilian Mazza; Santos, Renato Hideo Nakagawa; Laranjeira, Ligia Nasi; Egydio, Flávia de Mattos; Borges de Oliveira, Juliana Aparecida; Dall Orto, Frederico Toledo Campo; Beraldo de Andrade, Pedro; Bienert, Igor Ribeiro de Castro; Bosso, Carlos Eduardo; Mangione, José Armando; Polanczyk, Carisi Anne; Sousa, Amanda Guerra de Moraes Rego; Kalil, Renato Abdala Karam; Santos, Luciano de Moura; Sposito, Andrei Carvalho; Rech, Rafael Luiz; Sousa, Antônio Carlos Sobral; Baldissera, Felipe; Nascimento, Bruno Ramos; Giraldez, Roberto Rocha Corrêa Veiga; Cavalcanti, Alexandre Biasi; Pereira, Sabrina Bernardez; Mattos, Luiz Alberto; Armaganijan, Luciana Vidal; Guimarães, Hélio Penna; Sousa, José Eduardo Moraes Rego; Alexander, John Hunter; Granger, Christopher Bull; Lopes, Renato Delascio

    2018-04-03

    The effects of loading doses of statins on clinical outcomes in patients with acute coronary syndrome (ACS) and planned invasive management remain uncertain. To determine if periprocedural loading doses of atorvastatin decrease 30-day major adverse cardiovascular events (MACE) in patients with ACS and planned invasive management. Multicenter, double-blind, placebo-controlled, randomized clinical trial conducted at 53 sites in Brazil among 4191 patients with ACS evaluated with coronary angiography to proceed with a percutaneous coronary intervention (PCI) if anatomically feasible. Enrollment occurred between April 18, 2012, and October 6, 2017. Final follow-up for 30-day outcomes was on November 6, 2017. Patients were randomized to receive 2 loading doses of 80 mg of atorvastatin (n = 2087) or matching placebo (n = 2104) before and 24 hours after a planned PCI. All patients received 40 mg of atorvastatin for 30 days starting 24 hours after the second dose of study medication. The primary outcome was MACE, defined as a composite of all-cause mortality, myocardial infarction, stroke, and unplanned coronary revascularization through 30 days. Among the 4191 patients (mean age, 61.8 [SD, 11.5] years; 1085 women [25.9%]) enrolled, 4163 (99.3%) completed 30-day follow-up. A total of 2710 (64.7%) underwent PCI, 333 (8%) underwent coronary artery bypass graft surgery, and 1144 (27.3%) had exclusively medical management. At 30 days, 130 patients in the atorvastatin group (6.2%) and 149 in the placebo group (7.1%) had a MACE (absolute difference, 0.85% [95% CI, -0.70% to 2.41%]; hazard ratio, 0.88; 95% CI, 0.69-1.11; P = .27). No cases of hepatic failure were reported; 3 cases of rhabdomyolysis were reported in the placebo group (0.1%) and 0 in the atorvastatin group. Among patients with ACS and planned invasive management with PCI, periprocedural loading doses of atorvastatin did not reduce the rate of MACE at 30 days. These findings do not support the routine use

  15. Artificial Neural Network forecasting of storm surge water levels at major estuarine ports to supplement national tide-surge models and improve port resilience planning

    French, Jon; Mawdsley, Robert; Fujiyama, Taku; Achuthan, Kamal

    2017-04-01

    Effective prediction of tidal storm surge is of considerable importance for operators of major ports, since much of their infrastructure is necessarily located close to sea level. Storm surge inundation can damage critical elements of this infrastructure and significantly disrupt port operations and downstream supply chains. The risk of surge inundation is typically approached using extreme value analysis, while short-term forecasting generally relies on coastal shelf-scale tide and surge models. However, extreme value analysis does not provide information on the duration of a surge event and can be sensitive to the assumptions made and the historic data available. Also, whilst regional tide and surge models perform well along open coasts, their fairly coarse spatial resolution means that they do not always provide accurate predictions for estuarine ports. As part of a NERC Environmental Risks to Infrastructure Innovation Programme project, we have developed a tool that is specifically designed to forecast the North Sea storm surges on major ports along the east coast of the UK. Of particular interest is the Port of Immingham, Humber estuary, which handles the largest volume of bulk cargo in the UK including major flows of coal and biomass for power generation. A tidal surge in December 2013, with an estimated return period of 760 years, partly flooded the port, damaged infrastructure and disrupted operations for several weeks. This and other recent surge events highlight the need for additional tools to supplement the national UK Storm Tide Warning Service. Port operators are also keen to have access to less computationally expensive forecasting tools for scenario planning and to improve their resilience to actual events. In this paper, we demonstrate the potential of machine learning methods based on Artificial Neural Networks (ANNs) to generate accurate short-term forecasts of extreme water levels at estuarine North Sea ports such as Immingham. An ANN is

  16. Street canyon ventilation control by proper planning and development

    Balakin Vladimir Vasil'evich

    2014-05-01

    Full Text Available The objective of street canyon ventilation control in major streets is a tool of air pollution prevention in them, protection of housing areas from excessive wind or preservation and intensification of existing wind speed in case of insufficient ventilation. The maximum permissible concentration of car exhaust pollutants with wind speed within comfortable and permissible values by physiological and hygienic criteria, are ensured as from 40 to 70 % of thoroughfares in major cities. The dependence of air pollution level on wind speed is comparable to its dependence on traffic intensity and ratio of buildings height (H to street width. But one has to take into account that, if the wind blows across the street, vortices form within the street canyon, which results in higher concentration of car exhaust pollutants near the downwind buildings. The objective of this work is to find the functional dependences of wind speed in a major street on its width and density of buildings, and also to find out which street configurations are favorable for formation of closed air circulation within it, resulting in insufficient aeration. The experimental research was done on a site for large-scale modeling of built-up urban territory, using cup anemometers. The coefficients of dependence of wind speed within a street on the types of buildings and on the street width were obtained. Characteristics of street layouts for control of aeration were determined. Building density rates for maximizing or optimizing the wind speed were determined. Street layouts are considered where stable vortices form between the buildings. For example, vortices within the street canyon’s cross-section appear when buildings squarish in ground plan situated far apart are replaced by oblong ones with the minimum allowed intervals of 15 meters between them (for 5-storeyed buildings; or intervals equal to the buildings’ height, or where the buildings are long and close together. With

  17. Enviromental and land use Planning decision support system: An application example / Ordenación ambiental del Territorio sistema de apoyo a la decisión: Un ejemplo de aplicación

    Ardeshir Anjomani

    2011-09-01

    Full Text Available This paper deals with land use/environmental planning problems and describes the application of an innovative planning approach to develop alternative land use solutions. It provides an implementation example of a framework that can be applied to a variety of complex environmental and land use planning problems. The paper first briefly introduces an analysis process and a related Spatial Decision Support System (SDSS, which utilizes GIS and optimization models, both of which were developed in previous works. Then it attempts to demonstrate how the process and the SDSS can be used in real world situations to help in analysis and planning of spatial distribution of activities. This is accomplished by applying the innovative land-use planning approach to an area located in the fringe of a thriving metropolitan area, which encompasses a newly developed lake and major thoroughfares. Este artículo trata sobre el uso del suelo / problemas de planificación ambiental y se describe la aplicación de un enfoque de planificación innovador para desarrollar soluciones alternativas de uso del suelo. Se proporciona un ejemplo de implementación de un marco que se puede aplicar a una variedad de complejos problemas de la planificación ambiental y uso de la tierra. El primer artículo presenta brevemente un proceso de análisis relacionados con el sistema espacial de soporte de decisiones (SDSS, que utiliza modelos de SIG y de optimización, los cuales se han desarrollado en trabajos anteriores. A continuación, se intenta demostrar que el proceso y el SDSS se pueden utilizar en situaciones del mundo real para ayudar en el análisis y la planificación de la distribución espacial de las actividades. Esto se logra mediante la aplicación del innovador uso de la tierra enfoque de planificación de una zona situada en el borde de una próspera área metropolitana, que incluye un lago de nuevo desarrollo y las principales carreteras.

  18. Modeled Sea Level Rise Impacts on Coastal Ecosystems at Six Major Estuaries on Florida’s Gulf Coast: Implications for Adaptation Planning

    Birch, Anne P.; Brenner, Jorge; Gordon, Doria R.

    2015-01-01

    The Sea Level Affecting Marshes Model (SLAMM) was applied at six major estuaries along Florida’s Gulf Coast (Pensacola Bay, St. Andrews/Choctawhatchee Bays, Apalachicola Bay, Southern Big Bend, Tampa Bay and Charlotte Harbor) to provide quantitative and spatial information on how coastal ecosystems may change with sea level rise (SLR) and to identify how this information can be used to inform adaption planning. High resolution LiDAR-derived elevation data was utilized under three SLR scenarios: 0.7 m, 1 m and 2 m through the year 2100 and uncertainty analyses were conducted on selected input parameters at three sites. Results indicate that the extent, spatial orientation and relative composition of coastal ecosystems at the study areas may substantially change with SLR. Under the 1 m SLR scenario, total predicted impacts for all study areas indicate that coastal forest (-69,308 ha; -18%), undeveloped dry land (-28,444 ha; -2%) and tidal flat (-25,556 ha; -47%) will likely face the greatest loss in cover by the year 2100. The largest potential gains in cover were predicted for saltmarsh (+32,922 ha; +88%), transitional saltmarsh (+23,645 ha; na) and mangrove forest (+12,583 ha; +40%). The Charlotte Harbor and Tampa Bay study areas were predicted to experience the greatest net loss in coastal wetlands The uncertainty analyses revealed low to moderate changes in results when some numerical SLAMM input parameters were varied highlighting the value of collecting long-term sedimentation, accretion and erosion data to improve SLAMM precision. The changes predicted by SLAMM will affect exposure of adjacent human communities to coastal hazards and ecosystem functions potentially resulting in impacts to property values, infrastructure investment and insurance rates. The results and process presented here can be used as a guide for communities vulnerable to SLR to identify and prioritize adaptation strategies that slow and/or accommodate the changes underway. PMID:26207914

  19. 浅析军工重大项目的策划与研究%Planning and Research of Military Major Projects

    郑京森

    2015-01-01

    Excellent project planning is the important bridge connecting the project and project management. For a long time, project planning has been a short slab of military project. Influenced by the traditional planning system, military industrial project planning has been mired in plans and risk assessments. Referring to civil project planning ideas and methods, and combined with the characteristics of military projects, the defense industry project planning is studied and discussed in this papaer. At the same time, this plan has received preliminary application in some important projects.%优秀的项目策划是连接项目与项目管理的重要桥梁,长期以来,项目策划都是军工项目的一大短板。受到传统的计划体制的影响,军工项目策划一直陷于计划加风险评估的窠臼。本文借鉴民用项目的策划理念和方法,结合军工项目的特点,对军工项目策划进行了初步研究和探讨。同时,此方案已经在某重大项目中得到初步应用。

  20. The Blayais major construction project into perspective: nuclear power and land use planning in France, from the 1960's to the 1990's

    Cardarelly, Sebastien

    2014-01-01

    The energy issue has heavily influenced the regional planning of the French territory. As a massive public investment endeavour, the nuclear power program propelled the development of an important industry and rose the question of its incorporation into regional planning policies. This article focuses on the 'Grand Chantier' of the Blayais power station

  1. An analysis of content in comprehensive cancer control plans that address chronic hepatitis B and C virus infections as major risk factors for liver cancer.

    Momin, Behnoosh; Richardson, Lisa

    2012-08-01

    Chronic hepatitis B and hepatitis C virus (HBV and HCV) infections are among the leading causes of preventable death worldwide. Chronic viral hepatitis is the cause of most primary liver cancer, which is the third leading cause of cancer deaths globally and the ninth leading cause of cancer deaths in the United States. The extent to which comprehensive cancer control (CCC) programs in states, tribal governments and organizations, territories, and Pacific Island jurisdictions address chronic hepatitis B and/or hepatitis C infections as risk factors for liver cancer or recommend interventions for liver cancer prevention in their CCC plans remains unknown. We searched CCC plans for this information using the search tool at http://www.cdc.gov/cancer/ncccp/ to access the content of plans for this information. A combination of key search terms including "liver cancer", "hepatitis", "chronic alcohol", and "alcohol abuse" were used to identify potential content regarding liver cancer risk factors and prevention. Relevant content was abstracted for further review and classification. Of 66 (Although CDC funds 65 programs, one of the Pacific Island Jurisdiction grantees is the Federated States of Micronesia (FSM). This national program supports four FSM states, each of which submits a cancer plan to CDC for a total of 69 plans. During this time period, 66 plans were available on the website.) CCC plans, 27% (n = 18) addressed liver cancer using the above-mentioned search terms. In the 23 plans that addressed HBV and/or HCV, there were 25 goals, objectives, strategies, and outcomes aimed at reducing the incidence or prevalence of HBV and/or HCV infection. While nearly a third of CCC programs identify at least one goal, objective, strategy, outcome, or prevention program to reduce cancer burden in their CCC plans, few plans discuss specific actions needed to reduce the burden of liver cancer.

  2. Major depression

    Depression - major; Depression - clinical; Clinical depression; Unipolar depression; Major depressive disorder ... providers do not know the exact causes of depression. It is believed that chemical changes in the ...

  3. Driving speed on thoroughfares in minor towns in Denmark

    Jørgensen, Morten; Agerholm, Niels; Lahrmann, Harry

    Sammenhængen mellem trafikulykker og hastighed viser, at øget hastighed resulterer i flere og mere alvorlige trafikulykker. Tidligere undersøgelser har indikeret, at bilister overskrider hastighedsgrænsen på gennemfartsveje i mindre byer i Danmark. For at holde farten nede i bygennemfarter er der...

  4. Major Links.

    Henderson, Tona

    1995-01-01

    Provides electronic mail addresses for resources and discussion groups related to the following academic majors: art, biology, business, chemistry, computer science, economics, health sciences, history, literature, math, music, philosophy, political science, psychology, sociology, and theater. (AEF)

  5. Major Roads

    Minnesota Department of Natural Resources — This data set contains roadway centerlines for major roads (interstates and trunk highways) found on the USGS 1:24,000 mapping series. These roadways are current...

  6. Planning ahead

    Davies, J. [Mintec Inc. (US)

    2004-09-01

    The paper presents a state-of-the-art mine planning program that facilitates data storage and provides easy access to essential mine information. MineSight from Mintec, Inc., and the addition MineSight 3D provide a powerful tool used by major coal companies worldwide, offering modelling of different deposit types and complete planning tools including advanced surface/surface and solid/surface intersection routines. The new MineSight Operations addition helps to streamline the planning process and store raw blasthole data (in acQuire) and essential cut attribute information. 12 figs.

  7. Hanford Site Development Plan

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  8. Hanford Site Development Plan

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  9. Internet plan and planning

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  10. Managemant of NASA's major projects

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  11. Do Biology Majors Really Differ from Non–STEM Majors?

    Cotner, Sehoya; Thompson, Seth; Wright, Robin

    2017-01-01

    Recent calls to action urge sweeping reform in science education, advocating for improved learning for all students—including those majoring in fields beyond the sciences. However, little work has been done to characterize the differences—if any exist—between students planning a career in science and those studying other disciplines. We describe an attempt to clarify, in broad terms, how non–STEM (science, technology, engineering, and mathematics) majors differ from life sciences majors, and how they are similar. Using survey responses and institutional data, we find that non–STEM majors are not unilaterally science averse; non–STEM majors are more likely than biology majors to hold misconceptions about the nature of science, yet they are not completely ignorant of how science works; non–STEM majors are less likely than biology majors to see science as personally relevant; and non–STEM majors populations are likely to be more diverse—with respect to incoming knowledge, perceptions, backgrounds, and skills—than a biology majors population. We encourage science educators to consider these characteristics when designing curricula for future scientists or simply for a well-informed citizenry. PMID:28798210

  12. Securing Major Events

    Loeoef, Susanna

    2013-01-01

    When asked why the IAEA should provide nuclear security support to countries that organize large public events, Nuclear Security Officer Sophia Miaw answers quickly and without hesitation. ''Imagine any major public event such as the Olympics, a football championship, or an Expo. If a dirty bomb were to be exploded at a site where tens of thousands of people congregate, the radioactive contamination would worsen the effects of the bomb, increase the number of casualties, impede a rapid emergency response, and cause long term disruption in the vicinity,'' she said. Avoiding such nightmarish scenarios is the driving purpose behind the assistance the IAEA offers States that host major sporting or other public events. The support can range from a single training course to a comprehensive programme that includes threat assessment, training, loaned equipment and exercises. The type and scope of assistance depends on the host country's needs. ''We incorporate nuclear security measures into their security plan. We don't create anything new,'' Miaw said

  13. Decree no 88-622 of 6 May 1988 on emergency plans, in implementation of Act no 87-565 of 22 July 1987 on the organisation of public safety, forestry protection against fires and prevention of major risks

    1988-01-01

    This Decree contains provisions concerning special action plans (plans particuliers d'intervention - PPI) which are a type of emergency plan dealing in particular with sites which have at least one large nuclear installation in the following categories: a nuclear reactor with a thermal power greater than ten megawatts; plants for the processing of irradiated nuclear fuels, isotopic separation, chemical conversion of nuclear fuels and their fabrication. The PPI includes the description of the installation concerned, the list of communes on whose territory the emergency plan applies, the measures for protecting and informing the population, the diagrams for its evacuation, as well as information on shelters. Also listed are the emergency measures for neighbouring populations to be taken by the operator before the police authorities intervene or on their behalf [fr

  14. Do Biology Majors Really Differ from Non-STEM Majors?

    Cotner, Sehoya; Thompson, Seth; Wright, Robin

    2017-01-01

    Recent calls to action urge sweeping reform in science education, advocating for improved learning for all students-including those majoring in fields beyond the sciences. However, little work has been done to characterize the differences-if any exist-between students planning a career in science and those studying other disciplines. We describe an attempt to clarify, in broad terms, how non-STEM (science, technology, engineering, and mathematics) majors differ from life sciences majors, and how they are similar. Using survey responses and institutional data, we find that non-STEM majors are not unilaterally science averse; non-STEM majors are more likely than biology majors to hold misconceptions about the nature of science, yet they are not completely ignorant of how science works; non-STEM majors are less likely than biology majors to see science as personally relevant; and non-STEM majors populations are likely to be more diverse-with respect to incoming knowledge, perceptions, backgrounds, and skills-than a biology majors population. We encourage science educators to consider these characteristics when designing curricula for future scientists or simply for a well-informed citizenry. © 2017 S. Cotner et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  15. Key Planning Factors for Recovery from a Radiological Terrorism Incident

    2012-09-01

    measurements are made, these are collected electronically4 and automatically exported to local operation centers and incident command posts where the...economic, natural and built environments and a move to self-sufficiency, sustainability and resilience.” As can be seen in Figure 3-11, some long-term...Transportation and access routes Bridges Streets and thoroughfares Sidewalks and walkways Release of property from radiologically controlled areas

  16. OCRWM's evolving strategic planning process and the 1990 plan

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  17. FAA Flight Plan 2009-2013

    2009-01-01

    The Flight Plan is the strategic plan for the agency, the plan to help us prepare for the future. The majority of FAAs responsibilities are our core functionsour everyday roles and responsibilitieswhich are not specifically highlighted in th...

  18. Major Sport Venues

    Department of Homeland Security — The Major Public Venues dataset is composed of facilities that host events for the National Association for Stock Car Auto Racing, Indy Racing League, Major League...

  19. Major Depression Among Adults

    ... Depressive Episode Among Adolescents Data Sources Share Major Depression Definitions Major depression is one of the most ... Bethesda, MD 20892-9663 Follow Us Facebook Twitter YouTube Google Plus NIMH Newsletter NIMH RSS Feed NIMH ...

  20. Operating plan FY 1998

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  1. HANDI 2000 project execution plan

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  2. Plan well, plan often

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  3. Language Planning: Corpus Planning.

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  4. Fund management plan

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  5. Prospects after Major Trauma

    Holtslag, H.R.

    2007-01-01

    Introduction. After patients survived major trauma, their prospects, in terms of the consequences for functioning, are uncertain, which may impact severely on patient, family and society. The studies in this thesis describes the long-term outcomes of severe injured patients after major trauma. In

  6. Biological characterization of venom peptides from the neotropical social waps Polistes major major (Dominican Republic)

    Slaninová, Jiřina; Fučík, Vladimír; Borovičková, Lenka; Čeřovský, Václav

    2007-01-01

    Roč. 151, S1 (2007), s. 87-89 ISSN 1213-8118. [Pharmacological Days. Czech and Slovak Pharmacological Meeting /57./. Olomouc, 12.09.2007-14.09.2007] Institutional research plan: CEZ:AV0Z40550506 Keywords : venom peptides * Polistes major major Subject RIV: CE - Biochemistry

  7. Exploring the Potential of Transient Receptor Potential: Troubleshooting Troublesome Calcium Thoroughfares in Biomedicine

    Ammad Ahmad Farooqi

    2010-12-01

    Full Text Available Transient Receptor Potential-Canonical (TRPC channels are the border guards residing in the supra-molecular assembly of plasma membrane. TRPCs represent a family of channels that have dual functions of store-operated and second messenger-operated channels in a diversity of cell types. Any disruption in the spatio-temporal organization drastically influences the calcium homeostasis. This review summarizes current interpretations on the infrastructure and characteristic divalent ions regulation in molecular anomalies. A specific targeting of these channels will enable us to get a step closer to personalized medicines.

  8. 75 FR 16837 - Public Review of Draft United States Thoroughfare, Landmark, and Postal Address Data Standard

    2010-04-02

    ... comments shall be sent to Julie Binder Maitra, of the FGDC Secretariat via electronic mail, [email protected] electronic addresses such as e-mail addresses. It recognizes that some organizations are prohibited by..., participants will receive written notification of how their comments were addressed by electronic or postal...

  9. Major operations and activities

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development.

  10. A major safety overhaul

    2003-01-01

    A redefined policy, a revamped safety course, an environmental project... the TIS (Technical Inspection and Safety) Division has begun a major safety overhaul. Its new head, Wolfgang Weingarten, explains to the Bulletin why and how this is happening.

  11. Allegheny County Major Rivers

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset contains locations of major rivers that flow through Allegheny County. These shapes have been taken from the Hydrology dataset. The Ohio River,...

  12. Major operations and activities

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development

  13. Major Environmental Policy in 2000

    Choi, Hong Jin [Ministry Of Environment, Kwachon (Korea)

    2000-04-01

    As a new millennium has started, there are active movements developing a basic paradigm of vision and policy over a nation-wide to prepare changes actively. For the environmental sector, it is possible to live in a pleasant environment if everyone prepare and work together like dealing with Y2K problem. With a goal of being an environmentally advanced country in the early new millennium, it is planned to improve a basic life environment such as water and air and to promote an advanced environmental management policy for showing results of its reform in 2000. Therefore, it examines environmental management circumstances and a direction of environmental policy first and it discusses more about major environmental policy related to petroleum industry. 7 tabs.

  14. MAJOR REPOSITORY DESIGN ISSUES

    JACK N. BAILEY, DWAYNE CHESTNUT, JAMES COMPTON AND RICHARD D. SNELL

    1997-01-01

    The Yucca Mountain Project is focused on producing a four-part viability assessment in late FY98. Its four components (design, performance assessment, cost estimate, and licensing development plan) must be consistent. As a tool to compare design and performance assessment options, a series of repository pictures were developed for the sequential time phases of a repository. The boundaries of the time phases correspond to evolution in the engineered barrier system (EBS)

  15. Major international sport profiles.

    Patel, Dilip R; Stier, Bernhard; Luckstead, Eugene F

    2002-08-01

    Sports are part of the sociocultural fabric of all countries. Although different sports have their origins in different countries, many sports are now played worldwide. International sporting events bring athletes of many cultures together and provide the opportunity not only for athletic competition but also for sociocultural exchange and understanding among people. This article reviews five major sports with international appeal and participation: cricket, martial arts, field hockey, soccer, and tennis. For each sport, the major aspects of physiological and biomechanical demands, injuries, and prevention strategies are reviewed.

  16. Hospital admission planning to optimize major resources utilization under uncertainty

    Dellaert, N.P.; Jeunet, J.

    2010-01-01

    Admission policies for elective inpatient services mainly result in the management of a single resource: the operating theatre as it is commonly considered as the most critical and expensive resource in a hospital. However, other bottleneck resources may lead to surgery cancellations, such as bed

  17. Hospital admission planning to optimize major resources utilization under uncertainty

    Dellaert, N.P.; Jeunet, J.

    2010-01-01

    Admission policies for elective inpatient services mainly result in the management of a single resource: the operating theatre as it is commonly considered as the most critical and expensive resource in a hospital. However, other bottleneck resources may lead to surgery cancellations, such as bed capacity and nursing staff in Intensive Care (IC) units and bed occupancy in wards or medium care (MC) services. Our incentive is therefore to determine a master schedule of a given number of patient...

  18. Transportation Institutional Plan

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  19. 'Plans are useless'.

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve.

  20. Major New Initiatives

    First page Back Continue Last page Overview Graphics. Major New Initiatives. Multi-party multi-rate video conferencing OOPS. Live Lecture OOPS. Rural ATM Machine Vortex. Finger print detection HP-IITM. Medical Diagnostic kit NeuroSynaptic. LCD projection system TeNeT. Web Terminal MeTeL Midas. Entertainment ...

  1. Major Biomass Conference

    Top Scientists, Industry and Government Leaders to Gather for Major Biomass Conference America, South America and Europe will focus on building a sustainable, profitable biomass business at the Third Biomass Conference of the Americas in Montreal. Scheduled presentations will cover all biomass

  2. Unity in Major Themes

    Booss-Bavnbek, Bernhelm; Davis, Philip J.

    We describe and explain the desire, common among mathematicians, both for unity and independence in its major themes. In the dialogue that follows, we express our spontaneous and considered judgment and reservations; by contrasting the development of mathematics as a goal-driven process as opposed...

  3. Epistemic Planning

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  4. Information Communication Technology Planning in Developing Countries

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  5. Program Planning in Health Professions Education

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  6. Warehouse operations planning model for Bausch & Lomb

    Atilgan, Ceren

    2009-01-01

    Operations planning is a major part of the Sales& Operations Planning (S&OP) process. It provides an overview on the operations capacity requirements by considering the supply and demand plan. However, Bausch& Lomb does not have a structured operations planning process for their warehouse

  7. Forward planning

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  8. The Ursa Major supercluster

    Schuch, N.J.

    1983-01-01

    An optical and a radio survey have been carried out. The optical observations consist of a spectroscopic survey in which redshift data for cluster galaxies and optical identifications of radio sources were obtained with the 98-inch Isaac Newton telescope at the Royal Greenwich Observatory, and the 200-inch Hale telescope; the photographic survey in B, V and R colors was made with the 48-inch Schmidt telescope at Palomar. Some results on the galaxy distribution in the Ursa Major supercluster are briefly discussed. (Auth.)

  9. Layered Safe Motion Planning for Autonomous Vehicles.

    1995-09-01

    The major problem addressed by this research is how to plan a safe motion for autonomous vehicles in a two dimensional, rectilinear world. With given start and goal configurations, the planner performs motion planning which

  10. Buyer-supplier relationships and planning solutions

    Hvolby, H.H.; Trienekens, J.H.; Steger-Jensen, K.

    2007-01-01

    The paper focuses on supply chain relationships and segmented planning and ICT concepts. Major supplier segments are distinguished based on literature: capacity suppliers, standard suppliers, system suppliers and key suppliers. Next, current supply chain planning solutions are distinguished: vendor

  11. BNL accelerator plans

    Lowenstein, D.I.

    1986-01-01

    The Brookhaven National Laboratory plan for high energy and heavy ion physics accelerator use for the next ten-year period is described. The two major initiatives are in the construction of the Relativistic Heavy Ion Collider and the upgrade of the Alternating Gradient Synchrotron to a ''Mini Kaon Factory''

  12. Metropolitan planning organizations and transportation planning for megaregions

    2014-12-01

    Planning transportation across jurisdictions is a challenge faced in geographic areas throughout the U.S. Researchers identify megaregions as the sub-set of major regions, often multi-state, with the most significant transportation challenges, opport...

  13. Elective course planning

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  14. Major Depressive Disorder

    G Grobler

    2013-08-01

    Full Text Available The treatment guideline draws on several international guidelines: (iPractice Guidelines of the American Psychiatric Association (APAfor the Treatment of Patients with Major Depressive Disorder, SecondEdition;[1](ii Clinical Guidelines for the Treatment of DepressiveDisorders by the Canadian Psychiatric Association and the CanadianNetwork for Mood and Anxiety Treatments (CANMAT;[2](iiiNational Institute for Clinical Excellence (NICE guidelines;[3](iv RoyalAustralian and New Zealand College of Psychiatrists Clinical PracticeGuidelines Team for Depression (RANZCAP;[4](v Texas MedicationAlgorithm Project (TMAP Guidelines;[5](vi World Federation ofSocieties of Biological Psychiatry (WFSBP Treatment Guideline forUnipolar Depressive Disorder;[6]and (vii British Association forPsychopharmacology Guidelines.[7

  15. Inspection planning

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  16. AECB strategic plan 1999

    1999-03-01

    This strategic plan provides the direction and focus required to successfully carry out our mandate in an efficient and effective manner over the next two to three years. It gives broad corporate direction by identifying where efforts need to be focussed, and therefore provides guidance for setting priorities and allocating resources. While we cannot ignore any aspect of our mandate, we must recognize that we will always have more work to do than can be accomplished within the resources available to us. Therefore we must set priorities and develop appropriate management systems to ensure that our major efforts and our resources are being directed towards those priorities. Our strategic plan is not a static document. We will always be faced with new challenges, and our strategies for meeting those challenges will also have to change. Therefore our strategic plan must be seen as a guide that reflects both the ever-changing environment and our ability to deal with new or evolving changes effectively. This plan is not intended to be a detailed operational plan. Each directorate must develop its own operational plans and procedures based on the directions in this strategic plan, and on corporate priorities and policies. (author)

  17. Space shuttle operations integration plan

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  18. Communication Planning.

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  19. Conference Planning.

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  20. Systemic Planning

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  1. Marketing plan

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  2. Ontological Planning

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  3. Ultimate disposal: a plan for achievement

    Bartlett, J.W.

    1975-01-01

    Four major topics relevant to R and D plans for disposal were: functions of planning, plans development procedures, R and D program procedures, and R and D plans content. Comments on these topics emphasize four major points: plans and their results support decisions on disposal methods; decisions will winnow options on the basis of comprehensive assessments; the R and D plan for disposal will be comprehensive and maintain options; time frame for the R and D program may be about 20 years. Prior and on-going work has provided a good foundation for this planning effort and the content of the plans. The R and D plans are expected to be developed this year and updated periodically

  4. Planning Meals

    ... Take the guess work out of what to eat using our tips, recipes and sample meals. Featured Book: Ultimate Diabetes Meal Planner includes weekly plans for breakfast, lunch, dinner, and snacks, along with detailed recipes that make ...

  5. Education plan

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  6. business plan

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  7. 1994 Site Development Plan: A plan with vision

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  8. Planned Positron Factory project

    Okada, Sohei

    1990-01-01

    The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)

  9. Midwest regional management plan

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  10. Scenario planning.

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  11. Audit and Evaluation Plan FY 2002

    2002-01-01

    .... These projects also have been coordinated in the joint audit and inspection planning groups that address coverage in each major functional area. The plan also includes audit policy and oversight projects planned to start in FY 2002; however, intelligence coverage will be addressed separately.

  12. Energy planning and management plan

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  13. Family planning education.

    Hamburg, M V

    1983-02-01

    teaching in the middle school does include sex education and reproduction. Sex information for adults is offered at the time of marriage. Married or about to be married adults are the major target of the state's family planning education effort. The key educators are an extensive network of family planning workers. All hospitals have a family planning office, and there are also family planning workers in the factories. What is unique about the Chinese approach is its use of reward and punishment.

  14. ASPECTOS PRIORIZADOS EN LOS PLANES DE MEJORA DE LAS CARRERAS ACREDITADAS Y FOMENTO DE UNA CULTURA DE EVALUACIÓN EN LA UNIVERSIDAD DE COSTA RICA (PRIORITIES FAVORED BY ACCREDITED UNIVERSITY MAJORS IN THEIR SELFIMPROVEMENT PLANS AND PROMOTION OF A SELF-EVALUATION CULTURE IN THE UNIVERSITY OF COSTA RICA

    Guido Guido Elsiana

    2011-08-01

    Full Text Available Resumen:El artículo describe y analiza dieciséis planes de mejora realizados por las carreras de la Universidad de Costa Rica (UCR, que fueron acreditadas por el Sistema Nacional de Acreditación (SINAES entre los años del 2001 al 2010. Se ofrece un panorama de cuáles son las principales debilidades y acciones que han priorizado esas carreras para mejorar la calidad de sus ofertas académicas. Asimismo, se analiza la contribución los procesos de autoevaluación a la creación de una cultura de la evaluación en la UCR. Los hallazgos obtenidos de este estudio se presentan según los componentes valorados por el SINAES: currículum, administración de la carrera o programa, personal académico, estudiantes, infraestructura y equipamiento, impacto y pertinencia de la carrera. Se encontraron dos tipos de acciones de mejora, la primera de ellas relacionada con aspectos propios de la carrera y la otra que corresponde a la institución. Las categorías que más reportaron las unidades académicas fueron las que contenían acciones de mejora relacionadas con: la planta física, la actualización curricular, con la formación y reclutamiento de personal docente.Abstract: This article describes and analyzes sixteen self improvement plans conducted by academic departments in the University of Costa Rica (UCR after their self evaluations. The academic programs or majors of these units have all been accredited by the National Accreditation System (SINAES between 2001 and 2010. It overviews the priorities listed by academic units to improve the quality of their academic services, as well as the extent to which these processes contribute to the development of an evaluation culture in the UCR. Results are organized according to evaluation criteria listed by SINAES: curriculum, management of the academic program, faculty, students, infrastructure and equipment, impact and pertinence of each academic program or major. We found two types of improvement

  15. Institutional Plan FY 2003 - 2007

    Chartock, Michael; Hansen, Todd

    2003-01-27

    Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

  16. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  17. Draft Transportation Institutional Plan

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  18. Annual plan, December 1999

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  19. Flight Planning

    1991-01-01

    Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

  20. Weaving History through the Major

    Mayfield, Betty

    2014-01-01

    The benefits of including the study of the history of mathematics in the education of mathematics majors have been discussed at length elsewhere. Many colleges and universities now offer a History of Mathematics course for mathematics majors, for mathematics education majors, or for general credit. At Hood College, we emphasize our commitment to…

  1. Planning in Dynamic and Uncertain Environments

    1994-05-01

    119 E.3 SIPE Restrictions .................................. 120 F Demonstrations in the SOCAP Domain 121 F.1 SOCAP Demonstration...planning problem from the U.S. Central Command. Their application system, SOCAP (System for Operations and Crises Action Planning), was a major component of...Technology SCren I Domain Reasoning STechnology Requirements • SOCAP Military Operations -w Planning Planning Problem System Figure 1.1: Overview of SRI

  2. Tax planning strategies for physicians.

    Pope, Thomas R; Schwartz, Richard W

    2002-07-01

    The development of tax reduction strategies is a critical aspect of both corporate and personal financial planning because taxes represent the largest annual expenditure for the majority of Americans. The categories of tax reduction strategies discussed include charitable-giving techniques, ways to maximize business deductions, shifting income to family members, education tax incentives, retirement planning, and small business tax considerations. One use for these tax savings is the enhancement of a corporation's capabilities to provide services to patients.

  3. Recertification Project Plan

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  4. Attitudes toward family planning.

    Gille, H

    1984-06-01

    Many of the 135 countries participating in the 1974 UN World Population Conference were far from accepting the basic human right to decide freely and responsibly the number and spacing of their children and to have the information, education, and means to do so. Considerable progress has been made since then, and the number of developing countries that provide direct government support for family planning has increased to over 60%. Many have liberalized laws and regulations which restricted access to modern contraceptive methods, and a growing number provide family planning services within their health care programs. A few have recognized the practice of family planning as a constitutional right. In late 1983 at the Second African Population Conference, recognition of family as a human right was strongly contested by several governments, particularly those of West Africa. in developed countries most of the women at risk of unwanted pregnancy are using contraceptives. Of the major developing regions the highest use level is in Latin America, wherein most countries 1/3 to 1/2 of married women are users. Levels in Asian countries range from up to 10% in Afghanistan, Nepal, and Pakistan to up to 40% in the southeastern countries. China, a special case, now probably exceeds an overall use level of 2/3 of married women. Contraceptive use is lowest in Africa. There is room for improvement even among many of the successful family planning programs, as access to contraceptives usually is not sufficient to overcome limiting factors. To ensure the individual's free choice and strengthen the acceptability and practice of family planning, all available methods should be provided in service programs and inluded in information and education activities. Family planning programs should engage local community groups, including voluntary organizations, in all aspects of planning, management, and allocation of resources. At the government level a clear political commitment to family

  5. Interdisciplinary Project Experiences: Collaboration between Majors and Non-Majors

    Smarkusky, Debra L.; Toman, Sharon A.

    2014-01-01

    Students in computer science and information technology should be engaged in solving real-world problems received from government and industry as well as those that expose them to various areas of application. In this paper, we discuss interdisciplinary project experiences between majors and non-majors that offered a creative and innovative…

  6. VOYAGE PLANNING

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  7. Big plans.

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  8. Business plan

    Dorożyński, Tomasz; Urbaniak, Wojciech

    2016-01-01

    Running a business on an international scale requires not only a substantial body of knowledge but also the ability to apply it in practice. That is why our textbook, with a vast collection of practical examples, discusses a wide variety of pertinent issues connected with business operations in international markets, from international market analysis, drafting business plans, concluding business transactions and the insurance of goods through to customs clearance procedures and professional ...

  9. Strategic plan

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  10. Comprehensive facilities plan

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  11. NASA Technology Plan 1998

    1998-01-01

    This NASA Strategic Plan describes an ambitious, exciting vision for the Agency across all its Strategic Enterprises that addresses a series of fundamental questions of science and research. This vision is so challenging that it literally depends on the success of an aggressive, cutting-edge advanced technology development program. The objective of this plan is to describe the NASA-wide technology program in a manner that provides not only the content of ongoing and planned activities, but also the rationale and justification for these activities in the context of NASA's future needs. The scope of this plan is Agencywide, and it includes technology investments to support all major space and aeronautics program areas, but particular emphasis is placed on longer term strategic technology efforts that will have broad impact across the spectrum of NASA activities and perhaps beyond. Our goal is to broaden the understanding of NASA technology programs and to encourage greater participation from outside the Agency. By relating technology goals to anticipated mission needs, we hope to stimulate additional innovative approaches to technology challenges and promote more cooperative programs with partners outside NASA who share common goals. We also believe that this will increase the transfer of NASA-sponsored technology into nonaerospace applications, resulting in an even greater return on the investment in NASA.

  12. Process Management Plans

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  13. Developing a Personal Financial Planning Program: More than Just Courses

    Martin, Charles L., Jr.

    2007-01-01

    Personal financial planning is considered one of the major growth professions of the coming decade. Besides providing an opportunity for employment, a major in personal financial planning can open the door to a rewarding and challenging career. Career opportunities in the personal financial planning field include opening a private practice or…

  14. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  15. Unconventional Internships for English Majors.

    Otto, Don H.

    After five years of research, the English department at St. Cloud (Minnesota) State University created an internship program for English majors. The philosophy behind the program is that the typical experience of the English major in college is excellent preparation for what the college graduate will be doing in most careers in business,…

  16. Do You Have Major Depression?

    ... of this page please turn Javascript on. Feature: Depression Do You Have Major Depression? Past Issues / Fall 2009 Table of Contents Simple ... member may have major depression. —NIMH Types of Depression Just like other illnesses, such as heart disease, ...

  17. The planning cycle.

    Johnson, William

    2005-01-01

    Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.

  18. Planning Inequality

    Mandersheid, Katharina; Richardson, Tim

    2011-01-01

    as a territorial container, in which the social merges into regional and national entities. Correspondingly, movement is only interpreted as a derived demand, ignoring its integrative aspect as precondition of participation and part of network capital. On the other hand, the spatiality of the economy...... is represented as something outside and fluid which is meant to be channelled into the territorial containers by means of regional development and spatial planning. These representations of the social suggest a territorialized culturally integrated society as the unquestioned frame of reference which has lost...

  19. Understanding the Changing Dynamics of the Gender Gap in Undergraduate Engineering Majors: 1971-2011

    Sax, Linda J.; Kanny, M. Allison; Jacobs, Jerry A.; Whang, Hannah; Weintraub, Dayna S.; Hroch, Amber

    2016-01-01

    In this paper we examine the level and determinants of entering college students' plans to major in engineering. While the overall level of interest in engineering has fluctuated between 1971 and 2011, a very large gender gap in freshman interest remains. We find that the percent of first-year women who plan to major in engineering is roughly the…

  20. Optics Supply Planning System

    Gaylord, J.

    2009-01-01

    at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details

  1. Management of planned unit outages

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  2. Stenting of major airway constriction

    Wu Xiaomei

    2002-01-01

    Objective: To investigate the correlated issues in the stenting treatment of major airway constriction. Methods: Nineteen cases of major airway stenting procedure were studied retrospectively. The clinical choice of stents of different advantages or deficiencies were discussed. The importance of intravenous anesthesia supporting, life-parameters monitoring during the procedures and the prevention of complications were analysed. Results: Under intravenous and local anesthesia, 19 Wallstents had been successively placed and relieved 19 cases of major airway constrictions due to malignant or benign diseases (15 of tumors, 3 of tuberculosis, 1 of tracheomalacia). Intravenous anesthesia and life-parameters monitoring had made the procedures more safe and precise. Conclusions: Major airway stenting is an reliable method for relieving tracheobronchial stenosis; and intravenous anesthesia supporting and life-parameters monitoring guarantee the satisfactions of procedures

  3. Major hazards onshore and offshore

    1992-01-01

    This symposium continues the tradition of bringing together papers on a topic of current interest and importance in terms of process safety - in this case, Major Hazards Onshore and Offshore. Lord Cullen in his report on the Piper Alpha disaster has, in effect, suggested that the experience gained in the control of major hazards onshore during the 1980s should be applied to improve safety offshore during the 1990s. This major three-day symposium reviews what has been learned so far with regard to major hazards and considers its present and future applications both onshore and offshore. The topics covered in the programme are wide ranging and deal with all aspects of legislation, the application of regulations, techniques for evaluating hazards and prescribing safety measures in design, construction and operation, the importance of the human factors, and recent technical developments in protective measures, relief venting and predicting the consequences of fires and explosions. (author)

  4. Multiemployer Pension Plans

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  5. Liquid in the major incision

    Herrera Jaramillo, Diego Alberto; Ortega Jaramillo, Hector

    2003-01-01

    We present the case of a patient with spill pleural extending in the left major incision. In the chest thorax PA, we could observe one of the complex radiographic appearances that take the reconfiguration of fluid in this localization, being this appearance dependent of the patient's position. Some points are also discussed on the anatomy of the major incisions and some of their radiographic characteristics

  6. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  7. Emergency planning for industrial hazards

    Gow, H.B.F.; Kay, R.W.

    1988-01-01

    The European Communities have produced a Directive on the Major Accident Hazards of Certain Industrial Activities which sets out standards for the control and mitigation of the hazards presented by sites and storages which contain significant quantities of dangerous substances. An essential element of these controls is the provision of effective on-and off-site emergency plans. This conference explores the considerable research effort which is going on throughout the world in the improvement of systems for emergency planning. Attention was also drawn to areas where difficulties still exist, for example in predicting the consequences of an accident, the complexities of communication problems and the difficulties arising from involvement of the public. The proceedings are in six parts which deal with organizations implementing emergency planning: on- and off-site emergency planning and design; techniques for emergency plans; expenses and auditing of emergency plans; lessons learnt from the emergency management of major accidents; information to the public to and during emergencies. (author)

  8. Mega-Planning in Population

    Clark, Sarah C.; Murray, Margo

    2005-01-01

    Clark and Murray examine the six Critical Performance Factors for Mega planning in an example drawn from the five-year history of the population program of a major west coast philanthropy. In this article, the authors describe the salience and scope of the population issue as it is relates to other global trends; the steps the foundation took to…

  9. Planning the Dutch GP workforce.

    Batenburg, R.; Velden, L. van der; Greuningen, M. van

    2010-01-01

    CONTEXT: For a long time, shortages of health care personnel have been a major worldwide concern of health policy makers, professional bodies and patient organisations (cf. OECD, 2008). It is commonly acknowledged that manpower planning can be an important instrument to control shortages (and

  10. BROOKHAVEN: Major detectors for RHIC under construction

    Ludlam, Thomas W.

    1994-01-01

    On March 9-10, a cost and schedule review at Brookhaven verified construction readiness for the PHENIX detector (May 1993, page 10). PHENIX thus joins STAR (Solenoidal Tracking at RHIC - November 1991, page 17), whose construction plan was ratified in January 1993, as a major detector to take data when the RHIC heavy ion collider is completed in mid-1999. The goal of both detectors is to search for the transition from ordinary nuclear matter to a new state of matter consisting of (momentarily) unconfined quarks and gluons. This transition to a ''quark-gluon plasma'' (QGP) is predicted to occur under extreme conditions of temperature and energy density, as is likely to be the case in the collision of heavy ions of sufficient energy. RHIC is expected to produce the highest energy densities ever observed on the nuclear scale

  11. MAJOR PROJECTS THAT INFLUENCE WORLD TRADE

    GEORGE CORNEL DUMITRESCU

    2014-11-01

    Full Text Available In 1869, with the opening of the Suez Canal, world trade entered a new era of development. The commercial routes linking the Far East to the western countries were shortened considerably as compared to the maritime corridor around the Cape of Good Hope. In 1914, the opening of the Panama Canal sealed the new deal in world trade, opening for business the shortest commercial routes around the world. After 145 years from the inauguration of the Suez Canal, world trade is on the eve of a new expansion. Two major projects: the expansion of both the Suez and Panama canals, planned to be completed in the next two years, will double their transit capacity. This paper does a comparative analysis of these two strategic projects, underlining the main benefits for Egypt, Panama and world trade, based on the available statistical data, reports and literature in the field.

  12. Some Major Issues Influencing Nuclear Energy Prospective

    Feretic, D.

    2012-01-01

    The presentation analyses some issues which are of particular importance for future nuclear power application. These include duration of uranium reserves and high level radioactive waste decay period in function of uranium reserves (determined, assumed and speculative) and type of fuel cycle used. Public acceptance during essential historical milestones of nuclear power use, influence of safety and compatibility evaluations, quantified risk, externalities and nuclear accidents. Short review of major accidents, causes, consequences, impact of LNT and hormesis hypothesis. Particular problem for future of nuclear power is potential shortage of experienced personnel due to long period without plants construction. To address some of problems which may face future investors a brief review of specific events experienced during construction of NPP Krsko is presented. Such events could be of interest to countries planning to construct nuclear power plant.(author).

  13. Family planning costs and benefits.

    1989-01-01

    Government sponsored family planning programs have had major success in declining birth rates in Barbados, China, Cuba, Hong Kong, Indonesia, Korea, Mexico, Singapore, Sri Lanka, Taiwan, and Thailand. Non- government programs have had similar success in Brazil and Colombia. These programs have been estimated as preventing over 100 million births in China and 80 million in India. Research indicates that family planning programs can produce a 30-50% drop in fertility. Family planning information and some contraceptives can be best distributed through community organizations. Research also indicates male opposition has been a major factor in wider acceptance of family planning. Surveys indicate that 50% of the woman who want no additional children are not using any birth control. Many governments do not have the resource and money to implement programs. In the developing countries if those who were able to prevent the unwanted births had birth control, the population increases in those countries would have been 1.3% versus 2.2%. In earlier family planning programs foreign assistance paid over 80% of the cost, and national governments 20%; today this is reversed. The World Bank estimates that for major improvements in population growth and women's health, $7 billion will be needed yearly by the year 2000. The countries that have had the similar goals in development of human resources, social services, health, and education. They have attended to the status of women, female employment, and maternal and child health. Estimates are that 1.3 billion couples and individuals will need family planning services by the year 2000, and this will be a formidable task. This key elements of successful family planning programs are community participation, decentralization, and training.

  14. Consumers with Major Depressive Disorder: Factors Influencing Job Placement

    Hergenrather, Kenneth C.; Haase, Eileen; Zeglin, Robert J.; Rhodes, Scott D.

    2013-01-01

    The theory of planned behavior (TPB) was applied to study the factors that influence the intention of public rehabilitation placement professionals to place consumers with major depressive disorder (MDD) in jobs. A sample of 108 public rehabilitation placement professionals in the Mid-Atlantic region of the United States completed the MDD…

  15. Gulf digs in to tap a major uranium orebody

    Jackson, D.

    1977-01-01

    The progress and future plans of Gulf Mineral Resources Co. for tapping and developing a major uranium orebody via two concrete-lined shafts in the Grants uranium mineral belt in New Mexico are discussed. The mineralogy of the Grants belt is discussed as it relates to the Gulf development project. Numerous pictures of the operation are included

  16. Major Decisions: Motivations for Selecting a Major, Satisfaction, and Belonging

    Soria, Krista M.; Stebleton, Michael

    2013-01-01

    In this paper, we analyzed the relationship between students' motivations for choosing academic majors and their satisfaction and sense of belonging on campus. Based on a multi-institutional survey of students who attended large, public, research universities in 2009, the results suggest that external extrinsic motivations for selecting a major…

  17. Writing a successful business plan.

    Haag, A B

    1997-01-01

    1. In creating and building a business, the entrepreneur assumes all the responsibilities for its development and management, as well as the risks and risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. 2. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished product communicates the product/service to others and provides the basis for the financial proposal. 3. Planning helps identify customers, market area, pricing strategy, and competitive conditions. It aids in decision making and is an essential guide for operating a business successfully and measuring progress. 4. The business plan not only serves as a mechanism for obtaining any needed financial resources, but also indicates the future direction of the company.

  18. Comprehensive highway corridor planning with sustainability indicators.

    2011-10-01

    "The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pr...

  19. Amtrak's strategic business plan : progress to date

    1996-07-24

    To address its financial crisis and make its operations more efficient, in 1995 : Amtrak undertook a major corporate restructuring, along with developing its : Strategic Business Plan. This report (1) reviews Amtrak's success to date in : achieving f...

  20. Occupation Iraqi Freedom: The Importance of Planning

    Caston, Christine J

    2007-01-01

    ... addressed by the Combatant and Joint Force Commanders. The lack of an occupation plan had a major impact on how the Combatant Commander carried out Phases IV and V of Operation Iraqi Freedom and provides relevant lessons for future operations.

  1. Ontario's energy action plan

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  2. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  3. Personality, academic majors and performance

    Vedel, Anna; Thomsen, Dorthe Kirkegaard; Larsen, Lars

    2015-01-01

    Personality–performance research typically uses samples of psychology students without questioning their representativeness. The present article reports two studies challenging this practice. Study 1: group differences in the Big Five personality traits were explored between students (N = 1067......) in different academic majors (medicine, psychology, law, economics, political science, science, and arts/humanities), who were tested immediately after university enrolment. Study 2: six and a half years later the students’ academic records were obtained, and predictive validity of the Big Five personality...... traits and their subordinate facets was examined in the various academic majors in relation to Grade Point Average (GPA). Significant group differences in all Big Five personality traits were found between students in different academic majors. Also, variability in predictive validity of the Big Five...

  4. Plan Repair as an Extension of Planning

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  5. Major disruption process in tokamak

    Kurita, Gen-ichi; Azumi, Masafumi; Tuda, Takashi; Takizuka, Tomonori; Tsunematsu, Toshihide; Tokuda, Shinji; Itoh, Kimitaka; Takeda, Tatsuoki

    1981-11-01

    The major disruption in a cylindrical tokamak is investigated by using the multi-helicity code, and the destabilization of the 3/2 mode by the mode coupling with the 2/1 mode is confirmed. The evolution of the magnetic field topology caused by the major disruption is studied in detail. The effect of the internal disruption on the 2/1 magnetic island width is also studied. The 2/1 magnetic island is not enhanced by the flattening of the q-profile due to the internal disruption. (author)

  6. Marketing Plan for a Case company

    Iadykina, Anastasiia; Pavlidi, Kiriaki

    2015-01-01

    The major objective of this thesis is composing a concise, reliable and useful marketing plan for a Phimiso - My Sushi Café. The necessity of implementing the marketing planning and document a marketing plan with an action program arose when the case company experienced the negative affect of poor concept with misleading message and way too wide expansion of the menu. All of the above lead to outflow of the customers and stagnancy of the company. The final document covers the traditi...

  7. Writing a successful business plan: an overview.

    Haag, Annette B

    2013-01-01

    In creating and building a business, the entrepreneur assumes all the responsibilities for development and management, as well as the risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished plan communicates the product or service to others and provides the basis for the financial proposal. Copyright 2013, SLACK Incorporated.

  8. Family planning: the unfinished agenda.

    Cleland, John; Bernstein, Stan; Ezeh, Alex; Faundes, Anibal; Glasier, Anna; Innis, Jolene

    2006-11-18

    Promotion of family planning in countries with high birth rates has the potential to reduce poverty and hunger and avert 32% of all maternal deaths and nearly 10% of childhood deaths. It would also contribute substantially to women's empowerment, achievement of universal primary schooling, and long-term environmental sustainability. In the past 40 years, family-planning programmes have played a major part in raising the prevalence of contraceptive practice from less than 10% to 60% and reducing fertility in developing countries from six to about three births per woman. However, in half the 75 larger low-income and lower-middle income countries (mainly in Africa), contraceptive practice remains low and fertility, population growth, and unmet need for family planning are high. The cross-cutting contribution to the achievement of the Millennium Development Goals makes greater investment in family planning in these countries compelling. Despite the size of this unfinished agenda, international funding and promotion of family planning has waned in the past decade. A revitalisation of the agenda is urgently needed. Historically, the USA has taken the lead but other governments or agencies are now needed as champions. Based on the sizeable experience of past decades, the key features of effective programmes are clearly established. Most governments of poor countries already have appropriate population and family-planning policies but are receiving too little international encouragement and funding to implement them with vigour. What is currently missing is political willingness to incorporate family planning into the development arena.

  9. Planning documents: a business planning strategy.

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  10. Ontological Models to Support Planning Operations, Phase II

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  11. Defense waste management plan

    1983-06-01

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  12. SERC corporate plan 1993

    1993-03-01

    In its last Corporate Plan, the Science and Engineering Research Council (SERC) planned wide-ranging policy and programme reviews. These have been carried out and the results set the context for this plan. In addition, the SERC is responding to major changes in the higher education sector and a difficult financial climate. The Plan has been prepared before the Government's proposed White Paper on science and technology is available but is consistent with the SERC's advice on the White Paper. The SERC's ''mission statement'' recognises its dual role of strengthening the United Kingdom's capabilities in fundamental research and of developing capabilities in strategic research related to industrial and social need. Six strategic aims are identified: the funding of a portfolio of excellent research which contributes both to advancement of knowledge, and economic and social advance, the support of the training of scientists and engineers, the improvement of knowledge transfer within the ''science and engineering base'' and between this base and industry, the promotion of effective international collaboration, increasing the public awareness of research in science and engineering and improving the economy, efficiency and effectiveness of all of the SERC's operations. Within its programme expenditure, the SERC will examine whether funding should be extended to a wider range of bodies; develop new, more efficient, ways of funding higher education institutes (HEI) research; increase emphasis on output measures of research; specify service standards; and market-test scientific support activities. The SERC will make gains of at least 1.5% a year in efficiency of administration, through measures including market testing, and will extend management accounting systems. (Author)

  13. Major KEEP Findings, 1971 - 1975.

    Kamehameha Schools, Honolulu, HI. Kamehameha Early Education Project.

    This report lists the 34 major research findings from the Kamehameha Early Education Program (KEEP) for the years 1971-1975. Each finding is accompanied by a listing of KEEP technical reports and working papers which contain information relevant to that finding. Included among areas covered in the findings are: (1) student motivation, (2) teacher…

  14. Dynamic range majority data structures

    Elmasry, Amr Ahmed Abd Elmoneim; He, Meng; Munro, J. Ian

    2011-01-01

    Given a set P of n coloured points on the real line, we study the problem of answering range α-majority (or "heavy hitter") queries on P. More specifically, for a query range Q, we want to return each colour that is assigned to more than an α-fraction of the points contained in Q. We present a ne...

  15. Understanding Business Majors' Learning Styles

    Giordano, James; Rochford, Regina A.

    2005-01-01

    Recently, business education programs have experienced a decline in enrollment and an increase in attrition. To understand these issues and recommend solutions, the learning styles of 503 first-year business majors at an urban community college were examined. The results demonstrated that: (a) 94% of the participants were analytic learners; (b)…

  16. Epidemiology of major depressive disorder

    Stegenga, B.T.

    2011-01-01

    Major depressive disorder (MDD) is a serious health problem and will be the second leading cause of burden of disease worldwide by 2030. To be able to prevent MDD, insight into risk factors for the onset of MDD is of clear importance. On the other hand, if onset of MDD has occurred, one may argue

  17. Rediscovering Major N. Clark Smith.

    Buckner, Reginald T.

    1985-01-01

    Historians of American music education have yet to recognize a Black music educator as important and worthy of observation. This article discusses a candidate--Major Nathaniel Clark Smith, a little-known Black music educator, composer of more than a hundred works, businessman, humanitarian, and teacher of numerous big-name jazz musicians. (RM)

  18. Endocrinopathies in thalassemia major patient

    Lubis, D. A.; Yunir, E. M.

    2018-03-01

    Advanced in chelation therapy and regular blood transfusion have marked improvements in the life expectancy of patients with thalassemia major, however these patients still have to deal with several complications. We report a 19-year-old male, presented with multiple endocrine complication-related thalassemia; hypogonadism, short stature, osteoporosis with history of fracture, and subclinical hypothyroid.

  19. Physics momentum 'stars' draw majors

    Lindström, I

    2003-01-01

    Over the past decade, the number of University of Arizona students declaring physics as their major has doubled, amid a national decline. According to a recent report by the National Task Force on Undergraduate Physics, it is the university's dedication to its undergraduate physics program which draws students in (1 page).

  20. Major Depression Can Be Prevented

    Munoz, Ricardo F.; Beardslee, William R.; Leykin, Yan

    2012-01-01

    The 2009 Institute of Medicine report on prevention of mental, emotional, and behavioral disorders (National Research Council & Institute of Medicine, 2009b) presented evidence that major depression can be prevented. In this article, we highlight the implications of the report for public policy and research. Randomized controlled trials have shown…

  1. Dirichlet polynomials, majorization, and trumping

    Pereira, Rajesh; Plosker, Sarah

    2013-01-01

    Majorization and trumping are two partial orders which have proved useful in quantum information theory. We show some relations between these two partial orders and generalized Dirichlet polynomials, Mellin transforms, and completely monotone functions. These relations are used to prove a succinct generalization of Turgut’s characterization of trumping. (paper)

  2. An animated depiction of major depression epidemiology

    Patten Scott B

    2007-06-01

    Full Text Available Abstract Background Epidemiologic estimates are now available for a variety of parameters related to major depression epidemiology (incidence, prevalence, etc.. These estimates are potentially useful for policy and planning purposes, but it is first necessary that they be synthesized into a coherent picture of the epidemiology of the condition. Several attempts to do so have been made using mathematical modeling procedures. However, this information is not easy to communicate to users of epidemiological data (clinicians, administrators, policy makers. Methods In this study, up-to-date data on major depression epidemiology were integrated using a discrete event simulation model. The mathematical model was animated in Virtual Reality Modeling Language (VRML to create a visual, rather than mathematical, depiction of the epidemiology. Results Consistent with existing literature, the model highlights potential advantages of population health strategies that emphasize access to effective long-term treatment. The paper contains a web-link to the animation. Conclusion Visual animation of epidemiological results may be an effective knowledge translation tool. In clinical practice, such animations could potentially assist with patient education and enhanced long-term compliance.

  3. An animated depiction of major depression epidemiology.

    Patten, Scott B

    2007-06-08

    Epidemiologic estimates are now available for a variety of parameters related to major depression epidemiology (incidence, prevalence, etc.). These estimates are potentially useful for policy and planning purposes, but it is first necessary that they be synthesized into a coherent picture of the epidemiology of the condition. Several attempts to do so have been made using mathematical modeling procedures. However, this information is not easy to communicate to users of epidemiological data (clinicians, administrators, policy makers). In this study, up-to-date data on major depression epidemiology were integrated using a discrete event simulation model. The mathematical model was animated in Virtual Reality Modeling Language (VRML) to create a visual, rather than mathematical, depiction of the epidemiology. Consistent with existing literature, the model highlights potential advantages of population health strategies that emphasize access to effective long-term treatment. The paper contains a web-link to the animation. Visual animation of epidemiological results may be an effective knowledge translation tool. In clinical practice, such animations could potentially assist with patient education and enhanced long-term compliance.

  4. Hazardous materials incidents on major highways -- A case study

    McElhaney, M.S.

    1995-01-01

    Personnel from both the public and private sectors have been involved for many years in pre-planning for hazardous materials releases at fixed installations all over the world. As a result of several major petroleum releases during marine transportation, oil companies, private contractors and government agencies have been preparing contingency plans for oil spills and other petroleum product releases in marine settings. Various industry groups have also developed plans for railway and pipeline disasters. These response plans are of varying quality, complexity and usefulness. Organizations such as plant emergency response teams, government agencies, contract response and clean-up crews and fire departments use these plans as a basis for training and resource allocation, hopefully becoming familiar enough with them that the plans are truly useful when product releases occur. Planners and emergency responders to hazardous materials releases must overcome some of the deficiencies which have long stood in the way of efficient and effective response and mitigation efforts. Specifically they must recognize and involve all resources with which they may respond or interact during an incident. This involvement should begin with the planning stages and carry through to training and emergency response and recovery efforts. They must ensure that they adopt and utilize a common command and control system and that all potential resources know this system thoroughly and train together before the incident occurs. It is only through incorporating these two factors that may successfully combat the ever growing number of unwanted product releases occurring in the more difficult realm of transportation

  5. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  6. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  7. Plan Colombia

    Noam Chomsky

    2000-12-01

    Full Text Available Colombia recibe más ayuda militar de Estados Unidos que el resto de América Latina y el Caribe unidos, y esta situación puede profundizarse con la ejecución del Plan Colombia, fundamentado en la lucha antidrogas. Sin embargo, el pais ha sido calificado con el récord en violación de derechos humanos. En este contexto se aplica la reforma económica más significativa en la década de los noventa, generando condicionantes en los procesos de integración con sus vecinos. En concordancia con el secretario de Defensa, Henry Stimson, desde los años 60 Estados Unidos estaba autorizado para controlar su propio sistema regional, mientras todos los demás intenlos serian desmantelados. La presentación ambigua de esta política del gobierno estadounidense en Colombia es cómo disociar esta guerra contra la droga y la lucha irregular contrainsurgente En Estados Unidos hay otra opinión que debe conocerse para comprender las divergencias en e! interior de dicho país. Este artículo del prestigioso profesor universitario del MU, Noam Chomsky, es un referente obligado en términos de opinión pública y académica de dimensión internacional, por el inmenso respeto que infunde tanto en América como en Europa

  8. Distance majorization and its applications.

    Chi, Eric C; Zhou, Hua; Lange, Kenneth

    2014-08-01

    The problem of minimizing a continuously differentiable convex function over an intersection of closed convex sets is ubiquitous in applied mathematics. It is particularly interesting when it is easy to project onto each separate set, but nontrivial to project onto their intersection. Algorithms based on Newton's method such as the interior point method are viable for small to medium-scale problems. However, modern applications in statistics, engineering, and machine learning are posing problems with potentially tens of thousands of parameters or more. We revisit this convex programming problem and propose an algorithm that scales well with dimensionality. Our proposal is an instance of a sequential unconstrained minimization technique and revolves around three ideas: the majorization-minimization principle, the classical penalty method for constrained optimization, and quasi-Newton acceleration of fixed-point algorithms. The performance of our distance majorization algorithms is illustrated in several applications.

  9. Neurobiology of Major Depressive Disorder

    Rosa Villanueva

    2013-01-01

    Full Text Available We survey studies which relate abnormal neurogenesis to major depressive disorder. Clinically, descriptive gene and protein expression analysis and genetic and functional studies revised here show that individual alterations of a complex signaling network, which includes the hypothalamic-pituitary-adrenal axis; the production of neurotrophins and growth factors; the expression of miRNAs; the production of proinflammatory cytokines; and, even, the abnormal delivery of gastrointestinal signaling peptides, are able to induce major mood alterations. Furthermore, all of these factors modulate neurogenesis in brain regions involved in MDD, and are functionally interconnected in such a fashion that initial alteration in one of them results in abnormalities in the others. We highlight data of potential diagnostic significance and the relevance of this information to develop new therapeutic approaches. Controversial issues, such as whether neurogenesis is the basis of the disease or whether it is a response induced by antidepressant treatments, are also discussed.

  10. Hanford Facility contingency plan

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  11. Third corporate plan September 1991

    1991-01-01

    The Science and Engineering Research Council (SERC) published its first Corporate Plan in 1985 and its second in 1989. This third plan comes at a time of considerable change for the Council. Funding is tightly constrained, with the costs of research rising. Changes in funding patterns have made the pursuit of research in the higher-education sector - where the SERC deploys much of its resource -much harder, yet major new challenges and opportunities are opening up. The refocusing of a large organisation like the SERC is not accomplished overnight and needs careful preparation. This plan is therefore an interim document describing some important decisions recently taken and the reviews now being carried out to set future priorities. A fourth plan, to be published early in 1993, will describe the outcome of this reappraisal and set a definitive path towards the end of the century. The aims for the following programmes are stated and the funding objectives stated: the science board materials commission, engineering board, astronomy and planetary science board, nuclear physics board, fellowships, central computing, repayment work administration. Corporate plan actions for the neutron facilities, nuclear structure research, particle physics, information technology, engineering and international cooperation are presented. The impact of the reused plan on the manpower requirements is discussed. (author)

  12. Digital Architecture Planning Model

    Oxstrand, Johanna Helene; Al Rashdan, Ahmad Yahya Mohammad; Bly, Aaron Douglas; Rice, Brandon Charles; Fitzgerald, Kirk; Wilson, Keith Leon

    2016-01-01

    As part of the U.S. Department of Energy's Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development

  13. Digital Architecture Planning Model

    Oxstrand, Johanna Helene [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Al Rashdan, Ahmad Yahya Mohammad [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Bly, Aaron Douglas [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Rice, Brandon Charles [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Fitzgerald, Kirk [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Wilson, Keith Leon [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS)

    2016-03-01

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including

  14. Community development planning

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  15. Teaching Treatment Planning.

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  16. Intelligent robot action planning

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  17. Planning hierarchy, modeling and sdvanced planning dystems

    Meyr, Herbert Ottmar

    2003-01-01

    Planning hierarchy, modeling and sdvanced planning dystems / B. Fleischmann, H. Meyr. - In: Supply chain management / ed. by A. G. de Kok ... - Amsterdam u.a. : Elsevier, 2003. - (Handbooks in operations research and management science ; 11)

  18. Financial planning

    Χατζηγώγου, Αρτεμις Π.

    2003-01-01

    Σκοπός της μελέτης αυτής, είναι η συγκέντρωση όλων των στοιχείων εκείνων που συνθέτουν μια οργανωμένη διαδικασία έρευνας, που είναι γνωστή ως Financial Planning. Θα μπορούσαμε εναλλακτικά να πούμε, ότι βασικά ο χρηματοοικονομικός σχεδιασμός προγραμματίζει, εξευρίσκει και χρησιμοποιεί τα κεφάλαια με τέτοιο τρόπο ώστε η συνεισφορά τους να είναι μεγαλύτερη στην αποτελεσματική λειτουργία της οικονομικής μονάδας. Παρέχει τις γνώσεις των χρηματιστικών αγορών από όπου αντλούνται τα κεφάλαια. Οδηγεί ...

  19. Epidemiology of major depressive disorder

    Stegenga, B.T.

    2011-01-01

    Major depressive disorder (MDD) is a serious health problem and will be the second leading cause of burden of disease worldwide by 2030. To be able to prevent MDD, insight into risk factors for the onset of MDD is of clear importance. On the other hand, if onset of MDD has occurred, one may argue that different course patterns of MDD can be identified and that it is essential to examine their relationship to symptoms and function over time. Insight into these course patterns could assist in p...

  20. Aostra claims major oilsands breakthrough

    Anon.

    1991-01-01

    This paper reports that Alberta Oil Sands Technology and Research Authority (Aostra) has completed a horizontal well in-situ steam injection project it calls a major breakthrough in commercially producing bitumen from the bast Athabasca oilsands deposit in Alberta. Aostra the its $71 million (Canadian) proof of concept pilot underground test facility (UTF) near Fort McMurray, achieved a 60% bitumen recovery rate, compared with less than 20% recovery typically achieved with Alberta bitumen. More than 100,000 bbl of bitumen was produced during the project

  1. Vanpooling: the three major approaches

    Sears, P.M.

    1979-08-01

    The manual provides technical assistance to existing or prospective vanpool sponsors. It is designed to help them promote vanpooling in its three major approaches: employer sponsored, third party sponsored, and driver owned and operated. The first chapter is an overview of vanpooling and a second chapter, on vanpool marketing, is addressed to ridesharing coordinators and others whose responsibilities include the promotion of vanpooling. Some fact sheets on the three approaches provide convenient summaries of the needs and opportunities of each approach and suggest solutions to practical problems likely to be encountered in starting new vanpool programs.

  2. Majority rule on heterogeneous networks

    Lambiotte, R

    2008-01-01

    We focus on the majority rule (MR) applied on heterogeneous networks. When the underlying topology is homogeneous, the system is shown to exhibit a transition from an ordered regime to a disordered regime when the noise is increased. When the network exhibits modular structures, in contrast, the system may also exhibit an asymmetric regime, where the nodes in each community reach an opposite average opinion. Finally, the node degree heterogeneity is shown to play an important role by displacing the location of the order-disorder transition and by making the system exhibit non-equipartition of the average spin

  3. Societal risk and major disasters

    Clement, C.F.

    1989-01-01

    A disaster can be defined as an event, or a series of events, in which a large number of people is adversely affected by a single cause. This definition includes man-made accidents, like that at Chernobyl, as well as the natural disasters that insurance companies are sometimes pleased to describe as Acts of God. In 1986 alone, 12,000 people died and 2.2 million were made homeless by 215 major accidents or disasters. The nature of risk is examined in this paper. (author)

  4. Upgrading France's emergency plans

    Moures, Y.

    1991-01-01

    In France as elsewhere, the Chernobyl accident spurred a new stage in the development of nuclear safety. In the months following the accident, France's Minister of Industry launched a campaign to strengthen research and safety measures to: prevent reactor accidents; reinforce the concept of quality in operations; train staff, in areas such as crisis management; systematically review plans, installations and techniques related to crisis management; study accident containment procedures. There was also a systematic review of communication links with authorities and outside emergency organizations during the critical phase of an accident. On the operational level regulatory monitoring procedures were reorganized and reinforced. France has not opted for the permanent presence of on-site inspectors, but rather for the total, continuous responsibility of the power plant operator, with the safety authority intervening at frequent intervals. A major programme was also established to increase capabilities for investigation and intervention in a radioactive environment in nuclear installations. (author)

  5. ESnet Program Plan 1994

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  6. Neuroscience discipline science plan

    1991-01-01

    Over the past two decades, NASA's efforts in the neurosciences have developed into a program of research directed at understanding the acute changes that occur in the neurovestibular and sensorimotor systems during short-duration space missions. However, the proposed extended-duration flights of up to 28 days on the Shuttle orbiter and 6 months on Space Station Freedom, a lunar outpost, and Mars missions of perhaps 1-3 years in space, make it imperative that NASA's Life Sciences Division begin to concentrate research in the neurosciences on the chronic effects of exposure to microgravity on the nervous system. Major areas of research will be directed at understanding (1) central processing, (2) motor systems, (3) cognitive/spatial orientation, and (4) sensory receptors. The purpose of the Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of neurosciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of nervous system function. It contains a general plan that will be used by NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.

  7. ESnet Program Plan 1994

    Merola, S.

    1994-01-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  8. Telecommunications Network Plan

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM's information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program's Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs

  9. ATLAS Upgrade Plans

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  10. Maintenance Business Plans.

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  11. Calfornia General Plans

    California Natural Resource Agency — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  12. Understanding health insurance plans

    ... page: //medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... plan for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  13. Scenario planning and nanotechnological futures

    Farber, Darryl; Lakhtakia, Akhlesh

    2009-01-01

    Scenario planning may assist us in harnessing the benefits of nanotechnology and managing the associated risks for the good of the society. Scenario planning is a way to describe the present state of the world and develop several hypotheses about the future of the world, thereby enabling discussions about how the world ought to be. Scenario planning thus is not only a tool for learning and foresight, but also for leadership. Informed decision making by experts and political leaders becomes possible, while simultaneously allaying the public's perception of the risks of new and emerging technologies such as nanotechnology. Two scenarios of the societal impact of nanotechnology are the mixed-signals scenario and the confluence scenario. Technoscientists have major roles to play in both scenarios.

  14. Urban structure, energy and planning

    Große, Juliane; Fertner, Christian; Groth, Niels Boje

    2016-01-01

    Transforming energy use in cities to address the threats of climate change and resource scarcity is a major challenge in urban development. This study takes stock of the state of energy in urban policy and planning and reveals potentials of and constraints to energy-efficient urban development....... The relationship between energy and urban structure provides a framework for discussing the role of urban planning to increase energy efficiency in cities by means of three in-depth case studies of medium-sized cities in Northern Europe: Eskilstuna in Sweden, Turku in Finland and Tartu in Estonia. In some ways...... these cities go ahead when it comes to their national climate and energy policies and aim to establish urban planning as an instrument to regulate and influence the city’s transition in a sustainable way. At the same time, the cities are constantly facing goal conflicts and limitations to their scope of action...

  15. The value of preoperative planning.

    Graves, Matt L

    2013-10-01

    "Better to throw your disasters into the waste paper basket than to consign your patients to the scrap heap" has been a proverb of Jeff Mast, one of the greatest fracture and deformity surgeons in the history of our specialty. Stated slightly more scientifically, one of the major values of simulation is that it allows one to make mistakes in a consequence-free environment. Preoperative planning is the focus of this article. The primary goal is not to provide you with a recipe of how to steps. Rather, the primary goal of this article is to explain why preoperative planning should be standard, to clarify what should be included, and to provide examples of what can happen when planning is ignored. At the end of this, we should all feel the need to approach fracture care more intellectually with forethought, both in our own practices and in our educational system.

  16. Planning for greater confinement disposal

    Gilbert, T.L.; Luner, C.; Meshkov, N.K.; Trevorrow, L.E.; Yu, C.

    1985-01-01

    A report that provides guidance for planning for greater-confinement disposal (GCD) of low-level radioactive waste is being prepared. The report addresses procedures for selecting a GCD technology and provides information for implementing these procedures. The focus is on GCD; planning aspects common to GCD and shallow-land burial are covered by reference. Planning procedure topics covered include regulatory requirements, waste characterization, benefit-cost-risk assessment and pathway analysis methodologies, determination of need, waste-acceptance criteria, performance objectives, and comparative assessment of attributes that support these objectives. The major technologies covered include augered shafts, deep trenches, engineered structures, hydrofracture, improved waste forms, and high-integrity containers. Descriptive information is provided, and attributes that are relevant for risk assessment and operational requirements are given. 10 refs., 3 figs., 2 tabs

  17. The ground based plan

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  18. TMI-2 core examination plan

    Carlson, J.O.

    1984-07-01

    The role of the Three Mile Island Unit 2 (TMI-2) core examination in the resolution of major nuclear safety issues is delineated in this plan. Relevant data needs are discussed, and approaches for recovering data from the TMI-2 plant are identified. Specific recommendations and justifications are provided for in situ documentation and off-site artifact examination activities. The research and development program is being managed by EG and G Idaho, Inc

  19. Neuroticism in remitted major depression

    Gade, Anders; Kristoffersen, Marius; Kessing, Lars Vedel

    2015-01-01

    not been consistent. METHOD: We examined neuroticism, extraversion and perceived stress in 88 fully remitted depressed patients with a mean age of 60 years and with a history of hospitalization for major depressive disorder. Patients were divided into those with onset after and those with onset before 50......BACKGROUND: The personality trait of neuroticism is strongly related to depression, but depression is etiologically heterogeneous. Late-onset depression (LOD) may be more closely related to vascular factors, and previous studies of neuroticism in LOD versus early-onset depression (EOD) have...... age of onset and neuroticism was confirmed in analyses based on age of depression onset as a continuous variable. CONCLUSION: Neuroticism may be an etiological factor in EOD but not or less so in LOD. This finding contributes to the growing evidence for etiological differences between early- and late...

  20. Strategic planning applied to quality in asthma management for children.

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  1. Planning for Interagency Cooperation in Rural Development. CARD Report 45.

    Rogers, David L.; Glick, Edward L.

    With a major emphasis on cooperative planning in rural development, three elements of development process were identified: (1) integration of units involved, occurring when several organizations contribute to a larger collective effort; (2) decentralized planning and local initiative, occurring when planning initiative is at the local level; (3)…

  2. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  3. 11. Strategic planning.

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  4. Psychosocial implications of Thalassemia Major.

    Aydinok, Yesim; Erermis, Serpil; Bukusoglu, Nagihan; Yilmaz, Deniz; Solak, Ufuk

    2005-02-01

    Many causes including the chronicity of disease, burden of treatment modalities, morbidities, and the expectation of early death resulting from the disease complications, may lead to psychosocial burden in Thalassemia Major (TM) patients. A total of 38 patients with TM and their mothers were recruited to evaluate the psychosocial burden as well as to disclose whether the psychological status of the patients contribute to the compliance with the therapy or to the contrary. Demographic and disease variables were obtained. Child Behavior Check-list (CBCL) was completed by the mothers of the patients. A detailed psychiatric interview based on the 4th edition of the Diagnostic and Statistical Manual diagnostic criteria was performed for each patient. Symptom Distress Checklist 90 (SCL-90) scale was given to all mothers for evaluating their psychopathology. Although CBCL scores remained between the normal ranges, desferrioxamine mesylate (DFO)-compliant patients and the patients with lower ferritin values had significantly higher scores. A total of 24% of the patients had a psychiatric diagnosis including major depression, anxiety disorder, tic disorder, and enuresis nocturnal. The psychiatric diagnosis was significantly higher in the patients who were compliant with desferrioxamine compared with the non-compliant group (P = 0.007). The SCL-90 scores indicated that the mothers who had a child with good adherence to DFO had higher scale scores than the mothers with a poor adherent child. The increase risk of psychosocial and behavioral problems in thalassemics and their parents indicated the importance of a lifelong psychosocial support for the prevention of mental health issues. The patients and their parents, who were more conscious of the illness, were more worried but more compliant with the therapy and need stronger psychiatric support.

  5. Thalassaemia major and the heart

    J. Malcolm Walker

    2013-03-01

    Full Text Available Disorders of haemoglobin synthesis are the commonest monogenetic disorders worldwide. When first described, thalassaemia was universally fatal in childhood, but after the adoption of regular blood transfusion survival until early teenage and adulthood was to be expected. At that stage in the life of these affected individuals organ failure followed, due to accumulated iron, for which the human has no excretory capacity. Principal amongst the tissues affected by iron overload is the heart and even to the present day, heart disease accounts for the overwhelming majority of premature deaths in this population. Managing transfusion derived iron overload was the next hurdle for clinicians and the families of the patients. For nearly four decades the only available treatment was the demanding regime of parenteral chelation therapy, required on a daily basis, to achieve growth, development and survival with limited or no organ damage. Despite the adoption of these treatment strategies the outlook for thalassaemia patients remained poor, with a 30% to 40% mortality occurring between late teenage and 30 years of age, even in well organised health care systems, such as in the UK, where regular transfusion and desferioxamine treatment were readily available. This dreadful early mortality, largely as a consequence of myocardial iron overload, (1,2 is now improving so that in the UK and other developed nations, heart failure in thalassaemic patients has become uncommon and premature death a much rarer tragedy. This editorial reviews, from a personal viewpoint of a cardiologist involved in the care of these patients for the last 20 years, the progress in the management of the cardiovascular complications of thalassaemia major (TM, which has followed better techniques of identifying those thalassaemic individuals at greatest risk, improved chelation strategies making best use of the three chelating agents that are now available and improved co

  6. Status report : British Columbia`s economic plan

    NONE

    1999-01-01

    A sector-by-sector update of actions taken under British Columbia`s three-year economic plan is outlined and the progress to date reviewed. The three year plan includes the support for industry growth in partnership with the private sector, making Vancouver a major international conference destination, and developing Vancouver International Airport into a major gateway to the Pacific. The plan also includes the promotion of adventure tourism in major international markets, and promoting aboriginal tourism and culture. The government also plans to stimulate the economy by providing $973 million in tax reductions for BC families and business. 1 tab.

  7. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  8. Planning for renewable energy in Devon

    1993-04-01

    The aim of the Study was to examine the technical, planning and environmental factors, and the resource availability, which may affect the development of renewable energy schemes in Devon, with particular reference to West Devon. The study was undertaken to draw up a specimen planning policy framework for the development of renewable energy in Devon, looking at each major renewable energy source and at the relevant environmental and planning constraints; using this framework, to amplify the draft Structure Plan policy for renewable energy; to draw up draft guidance and specimen policies for a Local Plan covering renewable energy for a District Council, in this case, West Devon Borough; and to provide a pilot study for implementing the draft Planning Policy Guidance (PPG) on renewable energy. (author)

  9. Planning for Internationalization By Investing in Faculty

    Lisa K. Childress

    2009-11-01

    Full Text Available Over the last half century, major world events have prompted higher education institutions to develop internationalization plans. In order engage faculty in internationalization, higher education scholars and practitioners have recommended that internationalization plans include allocated resources, such as budgets for academic exchanges, faculty development workshops, and international curricular development and research grants (Olson, Green, & Hill, 2006; Paige, 2005; Siaya & Hayward, 2003. Yet, a frequently cited obstacle to faculty engagement in internationalization plans is lack of funding (Backman, 1984; Bond, 2003; Ellingboe, 1998; Green & Olson, 2003; Steers & Ungsen, 1992; Woolston, 1983. A cross-case analysis reveals that differential investment leads to faculty engagement in internationalization plans. This article discusses how two institutions developed funds from a variety of sources and institutional levels to engage faculty in an institutional planning process. This study offers implications for institutional planning, resource dependency theory, and internationalization.

  10. Wabamun : a major inland spill

    Goodman, R.H.

    2006-01-01

    The 2 largest spills in Canada this century have been in freshwater environments. This paper evaluated remedial actions taken after a spill which occurred on the shore of Lake Wabamun, Alberta. A freight train derailed in the residential area, spilling 750 m 3 of oil into the lake. The initial response was inadequate as the spilled material was not immediately identified as oil. Some containment booms were deployed. By mid-morning, the oil slick had spread 12 km, and was driven by the wind onto the beaches of cottages. The limited amount of response equipment during the early stages of the spill caused anxiety among residents, which was further compounded by a lack of governmental involvement. The experience of Wabamun showed that the methods of operation and skill sets of environmental response organizations that routinely respond to small spills cannot readily be applied to larger spills. Plans by the railway for the Wabamun area were generic and did not focus on any particular response scenario. Limitations in the Transportation of Dangerous Good were noted, as the 2 substances which spilled were not identified as requiring labels. Various data gaps were identified concerning spills involving high density viscous oil; the dynamics of near neutral density oil; the flowing of hot product; interaction of fine sediments; and the cutting of reed beds. It was concluded that new detection technologies and response technologies are required concerning the detection of oil in water, the collection and removal of oil, and tar formation. The development of a new emergency response agency was recommended, as well as the establishment of a new research and technical information institute and incident command structure (ICS). 22 refs., 3 figs

  11. Environmental influences on major waterfowl diseases

    Friend, M.

    1992-01-01

    The decline of North American waterfowl resources since the 1960s is well-known to this audience and need not be detailed to establish that population numbers for several key waterfowl species are at or near their lowest levels since records have been kept. Loss of habitat is an accepted major cause for the decline of waterfowl numbers and the wildlife conservation community is responding with initiatives to prevent further loss of existing wetland acreage, restoration for degraded wetlands and creation of new wetlands. Numerous joint ventures focusing on key waterfowl habitat requirements are being developed under the North American Waterfowl Plan. The importance of habitat loss also is reflected in many of the presentations at this conference on wetland conservation, including one special session devoted solely to that topic. A basic premise of the focus on wetlands is that restoration of waterfowl populations is habitat dependent. This is a tenable thesis if other factors suppressing waterfowl numbers are dealt with and the habitat base being enhanced sustains waterfowl rather than contributes to their death. My presentation addresses disease as a factor suppressing waterfowl numbers and the relation of habitat quantity and quality with waterfowl disease.

  12. Major Deficiencies Preventing Auditors From Rendering Audit Opinions on DOD General Fund Financial Statements

    Rauu, Russell

    1995-01-01

    .... We plan to issue a similar report each year. The audit objective was to identify and summarize the major deficiencies that prevented auditors from rendering audit opinions, other than disclaimers, on Army and Air Force general fund financial...

  13. Tilecal meets two major milestones

    Cavalli-Sforza, M.

    Over the last two months the Tile Calorimeter passed not one but two major milestones. In early May, the last of the 64 modules that make up one of the two Extended Barrels arrived at CERN from IFAE-Barcelona, equipped with optical components and tested. And during the Overview Week in Clermont-Ferrand, the last of the 64 Barrel modules, mechanically assembled, arrived from JINR-Dubna. Just a brief reminder: the ATLAS Tile Calorimeter is composed of 3 cylinders ("barrels") of steel, scintillating tiles and optical fibers, altogether about 12 m long, with an outer diameter of 8.4 m, and weighing about 2700 tons. The central cavity will contain the Liquid Argon cryostats, and the whole calorimetry system will measure the direction and energy of jets produced at the LHC, as well as the missing transverse energy, which as everyone knows is one of the telltale signals of new and exciting physics. Each of the three cylinders is divided azimuthally into 64 modules - much like the slices of an orange. The modules ar...

  14. Is pregnancy planning associated with background characteristics and pregnancy-planning behavior?

    Stern, Jenny; Salih Joelsson, Lana; Tydén, Tanja

    2016-01-01

    household income, to be currently working (≥50%) and to have longer relationships than women with unplanned pregnancies. The level of pregnancy planning was associated with planning behavior, such as information-seeking and intake of folic acid, but without a reduction in alcohol consumption. One......-third of all women took folic acid 1 month prior to conception, 17% used tobacco daily and 11% used alcohol weekly 3 months before conception. Conclusions A majority rated their pregnancy as very or fairly planned, with socio-economic factors as explanatory variables. The level of pregnancy planning should......Introduction Prevalence of planned pregnancies varies between countries but is often measured in a dichotomous manner. The aim of this study was to investigate to what level pregnant women had planned their pregnancies and whether pregnancy planning was associated with background characteristics...

  15. Nuclear Security Systems and Measures for Major Public Events. Implementing Guide (French Edition)

    2017-01-01

    This publication provides an overview, based on practical experience and lessons learned, for establishing nuclear security systems and measures for major public events. It covers technical and administrative nuclear security measures for developing the necessary organizational structure, developing plans, strategies and concepts of operations, and making arrangements for implementing the developed plans, strategies and concepts.

  16. Conditional Epistemic Planning

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  17. Marketing Planning: Feeniks Koulu

    Raut, Biranjan

    2013-01-01

    Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is to come up with systematic marketing plan following structured process. Thesis employs qualitative research methodology following inductive reasoning approach. Thesis, initiates by outlining theoretical planning methods, which then is materialized into marketing plan with the help of empirical research. Discussion and...

  18. Policy and planning for large infrastructure projects

    Flyvbjerg, Bent

    2005-01-01

    This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation ...... for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important.......This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...

  19. Piping in need of a facelift

    HSE Unit

    2013-01-01

    The LS1 offers a good opportunity to renovate/consolidate the CERN piping system. This is actually one of this year’s objectives set by CERN's Director-General as the state of several pressurised pipe networks has become a matter of significant concern. The ageing infrastructure makes it essential to perform in-depth inspections and repairs on several networks, which are easier to perform when most systems are down.   We are advising each Department/Group concerned to take a series of actions to ensure that their pipelines comply with personal, environmental and operational safety requirements: an inventory of ageing installations to allow a long-term replacement plan to be drawn up; immediate repair in the event of major signs of deterioration; investigation and repair/mitigation measures to prevent leaks; marking and, if necessary, mechanical protection of pipes located in thoroughfares and exposed to vehicles or people. Help needed, questions? Do not hesitate to contact us ...

  20. India's misconceived family plan.

    Jacobson, J L

    1991-01-01

    India's goal of reducing the national birth rate by 50% by the year 2000 is destined to failure in the absence of attention to poverty, social inequality, and women's subordination--the factors that serve to perpetuate high fertility. There is a need to shift the emphasis of the population control effort from the obligation of individual women to curtail childbearing to the provision of the resources required for poor women to meet their basic needs. Female children are less likely to be educated or taken for medical care than their male counterparts and receive a lower proportion of the family's food supply. This discrimination stems, in large part, from parents' view that daughters will not be able to remunerate their families in later life for such investments. The myth of female nonproductivity that leads to the biased allocation of family resources overlooks the contribution of adult women's unpaid domestic labor and household production. Although government statistics state that women comprise 46% of India's agricultural labor force (and up to 90% of rural women participate in this sector on some basis), women have been excluded systematically from agricultural development schemes such as irrigation projects, credit, and mechanization. In the field of family planning, the Government's virtually exclusive focus on sterilization has excluded younger women who are not ready to terminate childbearing but would like methods such as condoms, diaphragms, IUDs, and oral contraceptives to space births. More general maternal-child health services are out of reach of the majority of poor rural women due to long distances that must be travelled to clinics India's birth rate could be reduced by 25% by 2000 just by filling the demand for quality voluntary family planning services. Without a sustained political commitment to improve the status of women in India, however, such gains will not be sustainable.

  1. Low-level waste certification plan

    Greenhalph, W.O.

    1995-01-01

    This plan describes the organization and methodology for the certification of solid low-level waste (LLW) and mixed-waste (MW) generated at any of the facilities or major work activities of the Engineered Process Application (EPA) organization. The primary LLW and MW waste generating facility operated by EPA is the 377 Building. This plan does not cover the handling of hazardous or non-regulated waste, though they are mentioned at times for completeness

  2. Telecommunications network modelling, planning and design

    Evans, Sharon

    2003-01-01

    Telecommunication Network Modelling, Planning and Design addresses sophisticated modelling techniques from the perspective of the communications industry and covers some of the major issues facing telecommunications network engineers and managers today. Topics covered include network planning for transmission systems, modelling of SDH transport network structures and telecommunications network design and performance modelling, as well as network costs and ROI modelling and QoS in 3G networks.

  3. Structural master plan of flood mitigation measures

    A. Heidari

    2009-01-01

    Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possi...

  4. Are pedestrians invisible in the planning process?

    Gemzøe, Lars

    2001-01-01

    The vehicular traffic is very visible in the planning process. One of the reasons is that there is always plenty of data on the problems of car traffic - but what about data on the pedestrians and their needs? Three major studies on people in public spaces in the Inner City of Copenhagen have...... supplied data that show the quantity, character and changes through 30 years of public life. People in Copenhagen have become visible in the planning process. cd-rom....

  5. MAJOR OIL PLAYS IN UTAH AND VICINITY

    Chidsey, Thomas C.; Morgan, Craig D.; McClure, Kevin; Willis, Grant C.

    2003-01-01

    Utah oil fields have produced over 1.2 billion barrels (191 million m 3 ). However, the 13.7 million barrels (2.2 million m 3 ) of production in 2002 was the lowest level in over 40 years and continued the steady decline that began in the mid-1980s. The Utah Geological Survey believes this trend can be reversed by providing play portfolios for the major oil-producing provinces (Paradox Basin, Uinta Basin, and thrust belt) in Utah and adjacent areas in Colorado and Wyoming. Oil plays are geographic areas with petroleum potential caused by favorable combinations of source rock, migration paths, reservoir rock characteristics, and other factors. The play portfolios will include: descriptions and maps of the major oil plays by reservoir; production and reservoir data; case-study field evaluations; summaries of the state-of-the-art drilling, completion, and secondary/tertiary techniques for each play; locations of major oil pipelines; descriptions of reservoir outcrop analogs; and identification and discussion of land use constraints. All play maps, reports, databases, and so forth, produced for the project will be published in interactive, menu-driven digital (web-based and compact disc) and hard-copy formats. This report covers research activities for the fourth quarter of the first project year (April 1 through June 30, 2003). This work included describing outcrop analogs to the Jurassic Nugget Sandstone and Pennsylvanian Paradox Formation, the major oil producers in the thrust belt and Paradox Basin, respectively. Production-scale outcrop analogs provide an excellent view, often in three dimensions, of reservoir-facies characteristics and boundaries contributing to the overall heterogeneity of reservoir rocks. They can be used as a ''template'' for evaluation of data from conventional core, geophysical and petrophysical logs, and seismic surveys. The Nugget Sandstone was deposited in an extensive dune field that extended from Wyoming to Arizona. Outcrop analogs are

  6. Guidelines for the undergraduate psychology major: Version 2.0.

    2016-01-01

    The APA Guidelines for the Undergraduate Psychology Major: Version 2.0 (henceforth Guidelines 2.0; APA, 2013) represents a national effort to describe and develop high-quality undergraduate programs in psychology. The task force charged with the revision of the original guidelines for the undergraduate major examined the success of the document's implementation and made changes to reflect emerging best practices and to integrate psychology's work with benchmarking scholarship in higher education. Guidelines 2.0 abandoned the original distinction drawn between psychology-focused skills and psychology skills that enhance liberal arts development. Instead, Guidelines 2.0 describes five inclusive goals for the undergraduate psychology major and two developmental levels of student learning outcomes. Suggestions for assessment planning are provided for each of the five learning goals. (c) 2016 APA, all rights reserved).

  7. PPARC. 1998 business plan

    1998-01-01

    The 1998 PPARC Business Plan is based on the allocation of Pound Sterling 191.268M for 1998/99 set out in 'Allocation of the Science Budget 1998-99'. The objectives and programme to be pursued by PPARC in the years 1998/99 to 2001/02 inclusive are set out; the internal programme guidelines remain largely as in the 1997 Business Plan. Detailed spending plans have only been drawn up for 1998/99, pending the outcome of the government's Comprehensive Spending Review (CSR), and may have to be revised in the light of that Review. Firm commitments for domestic expenditure already made, or to be made before the outcome of the CSR is known, will not exceed 95% of the domestic expenditure allocation for 1998/99 in 1999/00, and 90% thereof in 2000/01. The past decade has been one of exceptional progress in both astronomy and particle physics, with the very real prospect of making further major advances in the next decade. PPARC supported scientists have played a significant role in securing this progress, and Council is concerned to ensure that they should continue to do so. The recognised world-class strength of current and past UK research and training in astronomy and particle physics is in large measure due to investments made ten or more years ago, and this investment must continue into the future. Since its inception in 1994, Council has been striving to create additional headroom for new investment, and this Business Plan is the first in which Council's efforts will be fully realised, with the restructuring of the Royal Observatories being completed in 1998199, continued efficiency gains at all sites, and reduction in the CERN and ESA budgets, all contributing to increased flexibility in the domestic science programme. The PPARC programme is dominated by long term international commitments with a planning horizon which extends well beyond 2001/02. Council therefore plans on a correspondingly long timescale, drawing on the 'Road Map' of opportunities of the highest

  8. [Oromaxillofacial changes in thalassemia major].

    De Mattia, D; Pettini, P L; Sabato, V; Rubini, G; Laforgia, A; Schettini, F

    1996-01-01

    Sixty patients (31 male and 29 female) with thalassemia major, aged between 6 and 26 years, 18 of which were splenectomized, were observed in this study evaluating the oro-maxillo-facial alterations and correlating them to transfusion indexes, serum ferritin levels, splenectomy and age. For each patient a haematologic and odontostomatologic card was filed with a view to report the medical and clinical history regarding: the haematologic picture, the prevention of caries and parodontal disease, the facies characteristics, the odonto-stomatologic examination, the orthodontic diagnosis, the skull X-rays and the orthopantomography. Poor oral hygiene as well as misknowledge of prevention were generally observed. All the patients showed carious lesions but most of them had never seen a dentist for therapy. The disharmonious growth of splanchnocranium, with the enlargement of the jaw and of its alveolar process, induced by the bone marrow hyperplasia, produced various and serious malocclusion stages (Angle's II class, deep bite, open bite), gnathologic alterations, hypodiaphanous paranasal sinuses and orbital hypertelorism, with a typical oriental-like facies. Malocclusion and the poor oral hygienic conditions determined the occurrence of marginal gingivitis, mainly localized at the level of the lower frontal teeth. In only 3 patients the oral mucous membrane was pale and atrophic. During this investigation agenesia and dental retention were reported in 30% and in 26% of the examined cases respectively, while no patients had supernumerary teeth. Tooth volume, position and shape abnormalities rarely occurred. Only in two patients was enamel hypoplasia described. The caries frequency greatly varied in number and in degree. Only five patients did not show any carious lesions. The caries index (DMF) for the permanent teeth calculated in all the 60 subjects was 5, 12 +/- 4.76. By utilizing Spearman's rank test the number of teeth with caries in the permanent dentition (DFM

  9. Radioactive waste management plan. Plan 82

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  10. Planned hospital birth versus planned home birth

    Olsen, O.; Clausen, J.A.

    2012-01-01

    Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998....

  11. Changed planning for planned and unplanned change

    Woerkum, van C.; Aarts, N.; Herzele, Van A.

    2011-01-01

    Change, planned and unplanned, can be the product of events (change by chance), new language (change from societal interaction), and practices (track-bound change), and can involve many different societal actors. To position planning as an activity within this broader context, we present a model

  12. Customer-focused planning: Beyond integrated resource planning

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  13. Strategic Planning in U.S. Municipalities

    James VAN RAVENSWAY

    2015-12-01

    Full Text Available Strategic planning started in the U.S. as a corporate planning endeavor. By the 1960’s, it had become a major corporate management tool in the Fortune 500. At fi rst, it was seen as a way of interweaving policies, values and purposes with management, resources and market information in a way that held the organization together. By the 1950’s, the concept was simplifi ed somewhat to focus on SWOT as a way of keeping the corporation afl oat in a more turbulent world. The public sector has been under pressure for a long time to become more effi cient, effective and responsive. Many have felt that the adoption of business practices would help to accomplish that. One tool borrowed from business has been strategic planning. At the local government level, strategic planning became popular starting in the 1980’s, and the community’s planning offi ce was called on to lead the endeavor. The planning offi ce was often the advocate of the process. Urban planning offi ces had been doing long-range plans for decades, but with accelerating urban change a more rapid action-oriented response was desired. The paper describes this history and process in the East Lansing, Michigan, U.S., where comprehensive community plans are the result of a multi-year visioning process and call for action- oriented, strategies for targeted parts of the community.

  14. Planning for information systems

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  15. The nuclear emergency plans

    Fuertes Menendez, M. J.; Gasco Leonarte, L.; Granada Ferrero, M. J.

    2007-01-01

    Planning of the response to emergencies in nuclear plants is regulated by the Basic Nuclear Emergency Plan (PLABEN). This basic Plan is the guidelines for drawing up, implementing and maintaining the effectiveness of the nuclear power plant exterior nuclear emergency plans. The five exterior emergency plans approved as per PLABEN (PENGUA, PENCA, PENBU, PENTA and PENVA) place special emphasis on the preventive issues of emergency planning, such as implementation of advance information programs to the population, as well as on training exercises and drills. (Author)

  16. Salient Beliefs in Majoring in Management Information Systems: An Elicitation Study

    Chipidza, Wallace; Green, Gina; Riemenschneider, Cindy

    2016-01-01

    Research utilizing the Theory of Planned Behavior to understand behavior should first elicit beliefs about the phenomenon from the target population. In order to understand the reasons why students choose to major or not major in Management Information Systems (MIS), we elicited beliefs from 136 students attending university in the United States…

  17. MARKETING PLANNING IN HEALTHCARE INDUSTRY

    Bobeica Ana Amaria

    2013-04-01

    Full Text Available The purpose of this paper is to develop a perspective on what is important or critical to the discipline of healthcare marketing by analyzing the marketing plan from the institutional (or organizational perspective. This “salience issue” is complicated by the structural problems in healthcare such as new advertising programs, advances in medical technology, and the escalating costs of care in the recent economic situation of world economic crisis. Reviewing a case study, the paper examines how marketing managers face increasingly difficult management and it emphasizes one more time the importance of marketing in the internal organizational structure. Also it shows the direct connection between the marketing strategy, the Quality of Healthcare and marketing planning in the internal organization of Private Healthcare Practice in Romania. Also it concludes that marketing planning in healthcare has to be very precised in order to achieve some major objectives: customer care, financial stability, equilibrium between stakeholders and shareholders and future improvement in communication to customers. The marketing strategies and programs discussed in this paper follow the analysis of the 4Ps of Healthcare Marketing Services and propose call to action plans and possibilities that might result in a more particular case study analysis of the Romanian Healthcare Market.

  18. Underground storage tank management plan

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  19. Underground storage tank management plan

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  20. Multi-objective evolutionary emergency response optimization for major accidents

    Georgiadou, Paraskevi S.; Papazoglou, Ioannis A.; Kiranoudis, Chris T.; Markatos, Nikolaos C.

    2010-01-01

    Emergency response planning in case of a major accident (hazardous material event, nuclear accident) is very important for the protection of the public and workers' safety and health. In this context, several protective actions can be performed, such as, evacuation of an area; protection of the population in buildings; and use of personal protective equipment. The best solution is not unique when multiple criteria are taken into consideration (e.g. health consequences, social disruption, economic cost). This paper presents a methodology for multi-objective optimization of emergency response planning in case of a major accident. The emergency policy with regards to protective actions to be implemented is optimized. An evolutionary algorithm has been used as the optimization tool. Case studies demonstrating the methodology and its application in emergency response decision-making in case of accidents related to hazardous materials installations are presented. However, the methodology with appropriate modification is suitable for supporting decisions in assessing emergency response procedures in other cases (nuclear accidents, transportation of hazardous materials) or for land-use planning issues.

  1. Infrastructure Area Simplification Plan

    Field, L.

    2011-01-01

    The infrastructure area simplification plan was presented at the 3rd EMI All Hands Meeting in Padova. This plan only affects the information and accounting systems as the other areas are new in EMI and hence do not require simplification.

  2. INDOT Technical Training Plan

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  3. DASH Eating Plan

    ... Approaches to Stop Hypertension. It is an eating plan that is based on research studies sponsored by ... risk of getting heart disease. The DASH eating plan Emphasizes vegetables, fruits, and whole-grains Includes fat- ...

  4. TECHNOLOGICAL IMPLEMENTATION PLAN

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  5. Technology Implementation Plan

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  6. Planning for Office Automation.

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  7. Breastfeeding: Planning Ahead

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  8. Planning for Pregnancy

    ... Before Pregnancy Home Overview Planning for Pregnancy Women Men Image Library Women Who Want to Become Pregnant Women Who Do Not Want to Become Pregnant Hugging Nutrition Physical Activity Visiting the Doctor Planning for Pregnancy Language: English ( ...

  9. Planning a pregnancy

    ... on Twitter Facebook Pinterest Email Print Planning a pregnancy Lupus Foundation of America September 27, 2017 Resource ... History or presence of antiphospholipid antibodies Planning Your Pregnancy Although many lupus pregnancies will have no complications, ...

  10. Breastfeeding: Planning Ahead

    Full Text Available ... To receive Breastfeeding email updates Enter email Submit Planning ahead From choosing the crib to finding a ... care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  11. Breastfeeding: Planning Ahead

    Full Text Available ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  12. The Plan's the Thing.

    Raley, Nancy

    1986-01-01

    Planning is the process of setting direction, priorities, and guidelines. A CASE survey of public relations professionals is described that notes the use of staff retreats and brainstorming sessions, among other techniques and strategies, that help professionals plan. (MLW)

  13. Holiday Meal Planning

    ... Count Glycemic Index Low-Calorie Sweeteners Sugar and Desserts Fitness Exercise & Type 1 Diabetes Get Started Safely ... plan ahead. Fitting in Sweets Learn about eating desserts on special occasions. In this section Planning Meals ...

  14. Maine highway safety plan

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  15. Planning of nets

    Carberry, M

    1996-01-01

    The paper is about the planning of nets in areas of low density like it is the case of the rural areas. The author includes economic and technological aspects, planning of nets, demands and management among others

  16. Integrated transportation scenario planning.

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  17. Breastfeeding: Planning Ahead

    Full Text Available ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding ...

  18. Breastfeeding: Planning Ahead

    Full Text Available ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ...

  19. USCG Security Plan Review

    Department of Homeland Security — The Security Plan Review module is intended for vessel and facility operators to check on the status of their security plans submitted to the US Coast Guard. A MISLE...

  20. Network development plan 1995

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  1. An Automation Planning Primer.

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  2. Pollution prevention program plan 1996

    1996-01-01

    This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE's commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE's routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations

  3. 30 CFR 780.14 - Operation plan: Maps and plans.

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  4. Developing nursing care plans.

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  5. Interactive Energy Planning

    Blarke, Morten Boje

    2006-01-01

    Though it is being questioned whether planning theory should be fitted into neat typologies, some have described evolving planning theory as a journey away from ethnocentrism, through the lands of rationalism, pragmatism, socio-ecological idealism, political-economic mobilization, currently...... anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...

  6. Sport event marketing plan

    Gašović Milan

    2007-01-01

    Full Text Available A marketing plan details how an event organization will compete in the marketplace in terms of its service offerings, promotions and evaluation. During the first stage of the marketing plan process, a number of its consumers (current, former and prospective and competitors. Marketing objectives are developed and implemented using an action plan. The marketing plan objectives are evaluated using an objective-discrepancy approach to determine the extent to which they were attained.

  7. The Project of Planning

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  8. Planning for agroforestry

    Budd, W.W.; Duchhart, I.; Hardesty, L.N.; Steiner, F.

    1990-01-01

    In this book a selection of contributions to the international symposium "Planning for agroforestry", held at Washington State University on April 24-27, 1989, is published. First the planning for agroforestry and agroforestry diagnosis and design is viewed over. Then the planning for and

  9. Generational Pension Plan Designs

    Huang, Xiaohong; Mahieu, Ronald

    2010-01-01

    We propose a generational plan for the occupational pension provision in which people from the same generation are pooled in a generational fund. Each fund can set its own policies independently. This plan provides the benefits of differentiation missing in the prevailing collective plan and the

  10. Making a Quit Plan

    ... BACK CLOSE SMOKEFREE.GOV HOME Create My Quit Plan Quitting starts now. Make a plan . Step 1 of 7 mark Step 2 of ... boosts your chances of success. Build a quit plan to get ready and find out what to ...

  11. Making Planning Work

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  12. Planning for study abroad.

    Freeman, L H; Hermann, C P

    1994-01-01

    There is more to planning for study abroad than buying airplane tickets. Providing a successful course away from the host institution requires a great deal of planning by the educator. This planning includes course development, budget, marketing, travel, housing, food, and entertainment. Careful preparation provides both the educator and student a unique and enriching experience that goes beyond the traditional course.

  13. Bounded Intention Planning Revisited

    Sievers Silvan; Wehrle Martin; Helmert Malte

    2014-01-01

    Bounded intention planning provides a pruning technique for optimal planning that has been proposed several years ago. In addition partial order reduction techniques based on stubborn sets have recently been investigated for this purpose. In this paper we revisit bounded intention planning in the view of stubborn sets.

  14. Plan Merging : Experimental results

    De Weerdt, M.M.; Van der Krogt, R.P.J.; Zutt, J.

    2003-01-01

    In this paper we discuss the results of a plan merging algorithm. This algorithm coordinates the plans of multiple, autonomous agents, each able to independently find a plan. This algorithm is evaluated using realistic data from a taxi company. We show that when we allow passengers to be a few

  15. Introduction to planning law

    Ronellenfitsch, M.

    1986-01-01

    The author surveys the planning law in the Federal Republic of Germany. He deals with general regulations of the administrative procedure and land-use planning procedure and the main special rules of planning law, according to the Atomic Energy Act, the Nuclear Installation Ordinance and the Federal Act on the Protection against Nuisances. (WG) [de

  16. NACS Store Planning Manual.

    College Store Journal, 1979

    1979-01-01

    Topics discussed by the NACS Store Planning/Renovation Committees in this updated version of the college store renovation manual include: short- and long-range planning, financial considerations, professional planning assistance, the store's image and business character, location considerations, building requirements, space requirements, fixtures,…

  17. Language Policy and Planning.

    Takala, Sauli; Sajavaara, Kari

    2000-01-01

    Focuses on foreign language planning, or the planned changes in foreign language instructional systems and in uses of languages in different social contexts with special reference to the Nordic and Baltic countries. Special attention is given to the relationship between language planning and evaluation. (Author/VWL)

  18. Climate plan 2004; Plan climat 2004

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  19. Transportation planning for planned special events

    2011-05-01

    Unique among planned special event activities are those events that carry the National Special Security Event (NSSE) designation. NSSEs occur with some frequency, with 35 of these events held between September 1998 and February 2010. These events inc...

  20. The alignment between spatial planning, transportation planning ...

    planning and environmental management strategically, functionally and operationally is ongoing .... between the built and the natural environment .... priorities as being experienced in. South Africa. 2. ... (intervention) proposals as contained.

  1. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  2. Tank waste remediation system risk management plan

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  3. Planned Parenthood works with Korean government.

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  4. Systems Engineering Management Plan

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  5. Tax Planning for Enterprises

    Fan Weiqing

    2011-01-01

    @@ Tax planning is legal planning activities for tax savings, meaning tax payers make operation plans within the national policy framework and choose operation programs favorable to tax savings.Along with a maturing socialist market economy system in China, tax planning is becoming an integral part of enterprise management and operation.For a better tax planning, enterprises have to fully understand the meaning, get proficient at relevant strategies, and apply these methods to save taxes and realize the maximization of enterprise value while considering the actual situation.

  6. Configuration Management Program Plan

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  7. Inspection and test planning

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  8. When does treatment plan optimization require inverse planning?

    Sherouse, George W.

    1995-01-01

    which the most sophisticated techniques of inverse planning represent a cost-effective solution is relatively small, and that surprisingly simple optimization techniques (and correspondingly simple treatment delivery techniques) can reliably produce acceptable results for the majority of routine conformal radiotherapy practice

  9. Women's experiences with family planning.

    Gupte, M

    1994-06-01

    India's family planning programs target rural women because they do not have political power. Interviews with those in Maharashtra show their lack of choice and low access to resources and their need for safe contraception. In 2 rural villages, for every dead child, a woman bears, on average, 2 more children. When a child dies, villagers first suspect the mother of having performed voodoo or witchcraft. Other suspected women are deserted women, widows, and menstruating women. Health and family planning services are not based on people's perceptions of body, anatomy, illness, and cure. People are not informed about interventions, particularly contraception. Women are not comfortable with contraceptives, and when physician ignore genuine symptoms and sequelae, it reinforces women's suspicions about contraceptives. Sterilizations performed in camps result in more side effects than individually performed sterilizations. During 1975-1977, women were kidnapped and sterilized under very unhygienic conditions. Common complaints after sterilization are menstrual disturbances and lower back pain. Many private physicians treat these complaints by performing hysterectomy. Women rarely are involved in the decision-making process determining whether or not they should undergo sterilization. They are often given false promises, if they accept sterilization. Indian women have little choice in contraceptives. The low biodegradability of condoms poses a disposal problem. Health workers often dispose of IUDs, pills, and condoms which they claim have been accepted. Auxiliary nurse midwives are pressured to meet family planning targets, so they harass women to accept contraception. Village women do not trust them. Health workers often steal cases from each other. Many complain that minorities are responsible for the population explosion, but the minority's family size is basically the same as that of the majority. Low access to general health services and harassment to fulfill family

  10. Rakhaine community embraces family planning.

    Chowdhury, S M

    1994-01-01

    The Rakhaines are a small, tightly knit community of 15,000 people who occupy parts of the coastal and hilly districts of southern Bangladesh. It is a closed community with different ethnic origins and religion from other Bangladeshis. As such, they have been largely unreached by government health and family planning services. In response to the need to bring services to these people, contact was established between the Family Planning Association of Bangladesh (FPAB) and the Rakhaine in 1987 in the interest of improving family health and well-being among the Rakhaine people through the introduction of maternal and child health care and family planning. The Family Planning Services for the Rakhaine Community project of the FPAB began in Cox's Bazar and Harbang in late 1987, and spread gradually over the hilly terrain inhabited by the Rakhaine to now serve 2000 couples. Although family planning was the focal point, the project also incorporated schemes for income generation, maternal and child health care, and sanitation. At baseline, less than 25% of reproductive age couples were using contraception, but this proportion grew to 69% by 1993, higher than the national contraceptive prevalence rate of approximately 40%. Used by 41% of married women of reproductive age, the pill is the most preferred contraceptive method, followed by sterilization among 10% of women. The efforts of fieldworkers were crucial to program success. The author notes that current users have been using contraception on average for just over two years. Moreover, the level of tetanus toxoid immunization rose to 60% of pregnant women, while 75% of children are now immunized against major life-threatening diseases. Some costs are recovered, but not enough to finance the project.

  11. Major Highway Lines, US, 2015, NAVTEQ

    U.S. Environmental Protection Agency — NAVTEQ Major Highways for the United States. The Major Highways layer contains Road Network features based on the Functional Class attribute value on each link...

  12. Institutional plan. FY 1998--2003

    NONE

    1997-07-01

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  13. Not planning a sustainable transport system

    Finnveden, Göran; Åkerman, Jonas

    2014-01-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed

  14. Not planning a sustainable transport system

    Finnveden, Göran, E-mail: goran.finnveden@abe.kth.se; Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  15. Smart City Planning

    Ekman, Ulrik

    2018-01-01

    This article reflects on the challenges for urban planning posed by the emergence of smart cities in network societies. In particular, it reflects on reductionist tendencies in existing smart city planning. Here the concern is with the implications of prior reductions of complexity which have been...... undertaken by placing primacy in planning on information technology, economical profit, and top-down political government. Rather than pointing urban planning towards a different ordering of these reductions, this article argues in favor of approaches to smart city planning via complexity theory....... Specifically, this article argues in favor of approaching smart city plans holistically as topologies of organized complexity. Here, smart city planning is seen as a theory and practice engaging with a complex adaptive urban system which continuously operates on its potential. The actualizations in the face...

  16. On strategic spatial planning

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  17. Setup planning for machining

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  18. Why It Pays to Major in Economics

    Carroll, Thomas; Assane, Djeto; Busker, Jared

    2014-01-01

    In this article, the authors use a large, recent, and accessible data set to examine the effect of economics major on individual earnings. They find a significant positive earnings gain for economics majors relative to other majors, and this advantage increases with the level of education. Their findings are consistent with Black, Sanders, and…

  19. 75 FR 31383 - Major Capital Investment Projects

    2010-06-03

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCIES: Federal Transit Administration (FTA... current approach to evaluating and rating major capital investment projects (``New Starts'' and ``Small...'' to address identified transportation needs in the corridor without a major capital investment in new...

  20. 2016 Status Report on Major Equipment Procurement

    David Perry

    2017-09-01

    Full Text Available The Department of National Defence made some progress in procurement in 2016 despite obstacles that included a continued drop in spending, the advent of a new federal Liberal government and uncertainty over the outcome of the Defence Policy Review. Four trends affected defence acquisitions in 2016. These include an ongoing slippage in recapitalizing the Canadian Armed Forces, some encouraging moves made on the shipbuilding and fighter jet files, mixed progress on implementing the 2014 Defence Procurement Strategy, and uncertainty over the Defence Policy Review. It is also too early to tell how the Trudeau government’s Policy on Results, known as the “deliverology” approach, will play out for defence procurement. However, Budget 2016’s major focus was not on defence, and it shifted some funding for capital equipment to a new endpoint of 2045. This suggests that delay in the overall defence procurement program continues. While the Liberals kept their pledge to make investment in the Royal Canadian Navy a priority, they also made good last year on a negative promise – not to purchase the F-35 stealth fighter bomber. However, further slowing things is the Liberals’ refusal to launch a competition to replace it until the Defence Policy Review is published. The government has made this situation more fraught with its intention to buy 18 Boeing Super Hornet fighter jets as interim aircraft, since Liberal policy requires the Royal Canadian Air Force to be capable of meeting both NORAD’s and NATO’s operational needs simultaneously. Prior to the release of the new defence policy, both the interim and permanent fighter aircraft projects lacked adequate funding. They were among several large projects that have been approved, but have not yet moved to the contract stage, and whose budgets were inadequate to move forward. Adding to this mix is the fact that a government-wide effort initiated in 2014 to streamline the defence procurement

  1. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Jinghuan He

    2015-01-01

    from a plan implementation perspective, and to establish an analytical framework for the study of the role of plans that fits the Chinese context. The findings may also help planners, policy makers and private developers to adjust urban planning within the implementation process in order to meet planning objectives at different levels. The evaluation of plan implementation can be divided into peformance-based and performance-based approaches Conformance approaches focus on the direct linkage (i.e. level of conformity between the plans and spatial outputs (Laurian et al., 2004; Tian & Shen, 2011. Performance approaches are concerned more with outcomes and the role of the plan in the urban development process (Barrett & Fudge, 1981; Faludi, 2000. Both of these approaches are employed in this research to evaluate the implementation of the Plan 1999. I firstly examine the level of conformity between the Plan 1999 and the overall peri-urban structure at the metropolitan level. I then use examples of specific areas (North Jinqiao Export Processing Zone and Xinmin Development Area to evaluate performance of the Plan 1999. The study also takes a diachronic approach, which looks at how relationships between variables change over time in the implementation of the Plan 1999. That is because the performance of plans is influenced by deeper-seated reasons such as the changing institutional context, particularly the levels of interaction between involved actors in the land development processes. As such, the changing planning system in Shanghai and the history of Shanghai’s peri-urban development in the second half of the 20th century are reviewed before the conformance-based and performance-based evaluation. This research leads to three major findings. First, peri-urban areas have played an increasingly important role in Shanghai’s urbanisation process through accommodating the rapidly increasing population and demands for growth. Such extensive peri-urban development was not

  2. Perceived Speech Privacy in Computer Simulated Open-plan Offices

    Pop, Claudiu B.; Rindel, Jens Holger

    2005-01-01

    In open plan offices the lack of speech privacy between the workstations is one of the major acoustic problems. Improving the speech privacy in an open plan design is therefore the main concern for a successful open plan environment. The project described in this paper aimed to find an objective...... parameter that correlates well with the perceived degree of speech privacy and to derive a clear method for evaluating the acoustic conditions in open plan offices. Acoustic measurements were carried out in an open plan office, followed by data analysis at the Acoustic Department, DTU. A computer model...

  3. PlanJury: probabilistic plan evaluation revisited

    Witte, M.; Sonke, J.-J.; van Herk, M.

    2014-03-01

    Purpose: Over a decade ago, the 'Van Herk margin recipe paper' introduced plan evaluation through DVH statistics based on population distributions of systematic and random errors. We extended this work for structures with correlated uncertainties (e.g. lymph nodes or parotid glands), and considered treatment plans containing multiple (overlapping) dose distributions (e.g. conventional lymph node and hypo-fractionated tumor doses) for which different image guidance protocols may lead to correlated errors. Methods: A command-line software tool 'PlanJury' was developed which reads 3D dose and structure data exported from a treatment planning system. Uncertainties are specified by standard deviations and correlation coefficients. Parameters control the DVH statistics to be computed: e.g. the probability of reaching a DVH constraint, or the dose absorbed at given confidence in a (combined) volume. Code was written in C++ and parallelized using OpenMP. Testing geometries were constructed using idealized spherical volumes and dose distributions. Results: Negligible stochastic noise could be attained within two minutes computation time for a single target. The confidence to properly cover both of two targets was 90% for two synchronously moving targets, but decreased by 7% if the targets moved independently. For two partially covered organs at risk the confidence of at least one organ below the mean dose threshold was 40% for synchronous motion, 36% for uncorrelated motion, but only 20% for either of the organs separately. Two abutting dose distributions ensuring 91% confidence of proper target dose for correlated motions led to 28% lower confidence for uncorrelated motions as relative displacements between the doses resulted in cold spots near the target. Conclusions: Probabilistic plan evaluation can efficiently be performed for complicated treatment planning situations, thus providing important plan quality information unavailable in conventional PTV based evaluations.

  4. Some insights into the intersection of physical planning and governance in Zimbabwe

    Chakwizira, J

    2008-04-01

    Full Text Available This paper presents some insights into the intersection of physical planning and governance in Zimbabwe. It argues that the major theoretical, policy and practice discourses - explaining the intersection of physical planning and governance - relate...

  5. New heuristics for planning operating rooms.

    Molina-Pariente, J.M.; Hans, Elias W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access

  6. 76 FR 47055 - Emergency Restoration Plan (ERP)

    2011-08-04

    ... (ERP) AGENCY: Rural Utilities Service, USDA. ACTION: Final rule. SUMMARY: The Rural Utilities Service... 12, 2004, at 69 FR 60541 requiring all borrowers to maintain an Emergency Response Plan (ERP) that... major natural or manmade disaster or other causes. This ERP requirement was not entirely new to the...

  7. Operations and maintenance plans for the TFTR

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  8. Development Plans and Life Plans: Knowledge Sharing?

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  9. PTTSA Action Plan Report

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  10. Agent independent task planning

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  11. Operation planning device

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  12. The Prototypical Majority Effect Under Social Influence.

    Koriat, Asher; Adiv-Mashinsky, Shiri; Undorf, Monika; Schwarz, Norbert

    2018-05-01

    Majority views are reported with greater confidence and fluency than minority views, with the difference increasing with majority size. This Prototypical Majority Effect (PME) was attributed generally to conformity pressure, but Koriat et al. showed that it can arise from the processes underlying decision and confidence independent of social influence. Here we examined the PME under conditions that differ in social influence. In Experiment 1, a robust PME emerged in the absence of information about the majority views, but the provision sof that information increased the choice of the majority view and magnified the PME. In Experiment 2, a PME emerged in a minority-biased condition that misled participants to believe that the majority view was the minority view, but the PME was stronger in a majority-biased condition. The results were discussed in terms of a dual-process view: The PME observed under social influence may contain externally driven and internally driven components.

  13. 30 CFR 784.23 - Operation plan: Maps and plans.

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  14. National transuranic program plan

    1994-01-01

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic wasteclose quotes. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial

  15. Regional Resource Planning Study

    2001-01-01

    Natural gas and electricity commodities are among the most volatile commodities in the world. Spurred on by the recent significant increases in the price of natural gas, the BC Utilities Commission initiated an investigation into factors impacting on natural gas prices, and the validity of the Sumas index (a market trading point, or interchange where multiple pipelines interconnect, allowing the purchase and sale of gas among market participants) as a price setting mechanism. The Commission also sought the opinions and perspectives of the the province's natural gas industry regarding the high volatility of the Sumas gas prices, and as to what could be done to alleviate the wild fluctuations. Following review of the responses from stakeholders, the Commission issued a directive to BC Gas to undertake discussions on regional resource planning with full representation from all stakeholders. This study is the result of the Commission's directive, and is intended to address the issues contained in the directives. Accordingly, the study examined gas demand in the region, demand growth, including power generation, natural gas resource balance in the region, the California impacts on demand and on supply to the region, supply shortfalls on a peak day, and on a seasonal and annual basis, near term remedies, possible resource additions in the longer term, the economic justification for adding major resources and proposed actions to develop needed resource additions. The study confirmed the existence of a growing capacity deficit, which limits the supply of natural gas to the region. Near term options to alleviate the regional capacity deficit were found to be limited to discouraging power generation from serving export markets, demand side management efforts, and expansion of the WEI's systems by 105 mmcf/d. Longer term solutions would involve larger scale expansion of WEI's T-South capacity, the BC Gas' Inland Pacific Connector Project and the Washington Lateral proposed by

  16. Wilderness fire management planning guide

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  17. Continuity planning for workplace infectious diseases.

    Welch, Nancy; Miller, Pamela Blair; Engle, Lisa

    2016-01-01

    Traditionally, business continuity plans prepare for worst-case scenarios; people plan for the exception rather than the common. Plans focus on infrastructure damage and recovery wrought by such disasters as hurricanes, terrorist events or tornadoes. Yet, another very real threat looms present every day, every season and can strike without warning, wreaking havoc on the major asset -- human capital. Each year, millions of dollars are lost in productivity, healthcare costs, absenteeism and services due to infectious, communicable diseases. Sound preventive risk management and recovery strategies can avert this annual decimation of staff and ensure continuous business operation. This paper will present a strong economic justification for the recognition, prevention and mitigation of communicable diseases as a routine part of continuity planning for every business. Recommendations will also be provided for environmental/engineering controls as well as personnel policies that address employee and customer protection, supply chain contacts and potential legal issues.

  18. Evacuation planning for Lilco's Shoreham plant

    Zorpette, G.

    1987-01-01

    This article reports that the Shoreham Nuclear Power Station, an 820-megawatt boiling-water reactor built by the Long Island Lighting Co., has taken 19 years to build and has so far cost nearly $5 billion. Because no emergency plan for coping with a major accident has been approved by the U.S. Nuclear Regulatory Commission, the plant has not been issued a Federal license to operate at full power. The cause of this impasse is the refusal of New York State and Suffolk County to participate in any emergency plan, on the ground that the geography of Long Island would make such a plan impossible to execute. The regulatory commission's rules require the operator of a nuclear plant to enlist cooperation from state and local authorities in an emergency plan. Shoreham's supporters charge that state and county are exploiting that requirement to block operation of the politically unpopular plant

  19. The public transportation system security and emergency preparedness planning guide

    2003-01-01

    Recent events have focused renewed attention on the vulnerability of the nation's critical infrastructure to major events, including terrorism. The Public Transportation System Security and Emergency Preparedness Planning Guide has been prepared to s...

  20. Fast Flux Test Facility project plan. Revision 2

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  1. Equipment acquisition plans for the SSCL magnet excitation power system

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  2. Fast Flux Test Facility project plan. Revision 2

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  3. Comprehensive highway corridor planning with sustainability indicators : [research summary].

    2013-04-01

    The Maryland State Highway Administration (SHA) has initiated major planning : efforts to improve transportation efficiency, safety and sustainability on critical : highway corridors through its Comprehensive Highway Corridor (CHC) program. : It is i...

  4. Chesapeake Highway Advisories Routing Traffic, Chart, Business Plan

    1996-10-01

    THE BUSINESS PLAN IS ORGANIZED INTO FOUR MAJOR SECTIONS. THE FIRST SECTION IS INTRODUCTORY IN NATURE AND PROVIDES BACKGROUND INFORMATION ON ITS AND THE CHART PROGRAM IN MARYLAND. IT INCLUDES THE CHART MISSION, GOALS AND OBJECTIVES, AS WELL AS OVERVIE...

  5. Surface Combatant Planning Since the End of the Cold War

    Gillen, Daniel

    1998-01-01

    .... This reduction was part of the U.S. military transformation in the post-Cold War period. This thesis examined the major factors that influenced the change in surface combatant planning since 1990, i.e...

  6. Schedule optimization study implementation plan

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  7. Future planning in preschool children.

    Moffett, Lillie; Moll, Henrike; FitzGibbon, Lily

    2018-05-01

    The capacity to plan ahead and provide the means for future ends is an important part of human practical reasoning. When this capacity develops in ontogeny is the matter of an ongoing debate. In this study, 4- and 5-year-olds performed a future planning task in which they had to create the means (a picture of a particular object, e.g., a banana) that was necessary to address a future end (of completing a game in which such a picture was missing). Children of both ages drew more targets than children in a control condition in which there was no future end to be pursued. Along with prior findings, the results suggest a major progression in children's future thinking between 3 and 5 years. Our findings expand on prior knowledge by showing that young children cannot only identify the probate means to future ends but determine such ends and create the means to achieve them, thus offering compelling evidence for future planning. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  8. Interim Hanford Waste Management Plan

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  9. Planning Public Transport

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  10. Practical Planning in COLLAGE

    Lansky, Amy L.; Getoor, Lise C.; Friedland, Peter (Technical Monitor)

    1994-01-01

    COLLAGE is a domain-independent planner that differs from traditional planners in two key ways: (1) it uses a diverse and extendible set of (it action-based) plan constructions methods; and (2) it utilizes a technique called (it localization) to partition the planning problem into smaller (and potentially interacting) sub problems. In this paper, we describe these features and how they are exploited in two different real-world planning domains. The first domain, building construction planning, has served as a framework for us to investigate how localization can improve scalability. The second domain, data analysis planning, benefits from COLLAGE's unique plan construction and representation methods. In addition, we describe extensions that were necessary to tackle these real-world problems.

  11. Business plan competition

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  12. Influenza pandemic planning guide

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  13. Management Planning In Transport

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  14. Planning Practice and Research

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  15. Utility planning for decommissioning

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  16. Contingency planning: preparation of contingency plans

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  17. Improving adherence with deferoxamine regimen in thalassemia major using education

    Gholamreza Pouladfar

    2006-02-01

    Full Text Available Background: Subcutaneous deferoxamine is the first line for management of iron overload in thalassemia major. There is a wide deferoxamine adherence variation in patients with thalassemia major. In order to assess the effect of education on patients and their parents, a cognitive approach was used. Methods: In a randomized control trial, 78 consecutive patients with thalassemia major were randomly divided into educational (38 cases, 50% male and 50% female and control (40 cases, 65% male and 35% female groups. Oral and practical education sessions for deferoxamine injection were planned. Deferoxamine usage, pump function, side effects, knowledge levels of the patients and their parents, and ferritin serum levels were assessed before and after the trail. The knowledge was also evaluated promptly after educational sessions. Results: the mean age of experimental and control groups were 14.6 and 13.0 years, respectively. There was no significant difference in age, sex and weight (P>0.05 at the end of the study, there was no significant change in the level of knowledge in both groups however, the patients who used deferoxamine at least 5 times a week were increased in the experimental group (P0.001. Conclusion: A cognitive approach had relatively significant effect on deferoxamine adherence. However, educational sessions had not dramatic change in knowledge levels of the patients and their parents, but oral and practical education produced a significant change in decreasing local side effects of subcutaneous deferoxamine in thalassemia major.

  18. Regional manpower planning

    G. Erens; P. Salamink; C.A. Van der Merwe CA

    2003-01-01

    Particular problems come to the fore when planning development at the regional level. These range from the complexities of the multifarious interactions between the sect oral and local components of the region to the necessity of achieving extensive participation of regional stakeholders in the planning process. In this paper a methodology for regional manpower planning is proposed. The methodology is designed to accommodate the full range of problems by applying a systems approach which is b...

  19. Tax planning in corporation

    Nevodnicheva, Yulia

    2010-01-01

    This thesis "Tax planning in corporation" puts brain to legal entity income tax and it is looking for possible solutions in tax planning in corporation. The first part deals with the tax theory, the other part is the theory of tax planning, comparison of tax regimes and tax policy and tax revenue by optimizing both internationally and in the local aspect. The last part discusses options for optimizing tax

  20. Biodiesel Test Plan

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  1. China SLAT Plan Template

    Dietrich, Richard E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  2. Antimicrobial activity of analogues of a peptide isolated from venom glands of social wasps Polistes major major inhabiting the Dominican Republic

    Ježek, Rudolf; Šebestík, Jaroslav; Šafařík, Martin; Borovičková, Lenka; Fučík, Vladimír; Čeřovský, Václav; Slaninová, Jiřina

    2008-01-01

    Roč. 14, č. 8 (2008), s. 99-99 ISSN 1075-2617. [European Peptide Symposium /30./. 31.08.2008-05.09.2008, Helsinki] Institutional research plan: CEZ:AV0Z40550506 Keywords : peptides from venom glands * Polistes major * synthesis and antimicrobial activity * analogues Subject RIV: CC - Organic Chemistry

  3. Animation of planning algorithms

    Sun, Fan

    2014-01-01

    Planning is the process of creating a sequence of steps/actions that will satisfy a goal of a problem. The partial order planning (POP) algorithm is one of Artificial Intelligence approach for problem planning. By learning G52PAS module, I find that it is difficult for students to understand this planning algorithm by just reading its pseudo code and doing some exercise in writing. Students cannot know how each actual step works clearly and might miss some steps because of their confusion. ...

  4. Reasoning about plans

    Allen, James; Pelavin, Richard; Tenenberg, Josh

    1991-01-01

    This book presents four contributions to planning research within an integrated framework. James Allen offers a survey of his research in the field of temporal reasoning, and then describes a planning system formalized and implemented directly as an inference process in the temporal logic. Starting from the same logic, Henry Kautz develops the first formal specification of the plan recognition process and develops a powerful family of algorithms for plan recognition in complex situations. Richard Pelavin then extends the temporal logic with model operators that allow the representation to

  5. Strategic planning for neuroradiologists.

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. Business Plans For Dummies

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  7. Planning Complex Projects Automatically

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  8. Research Planning Process

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  9. Public Participation Plan

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  10. Energy planning in Spain

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  11. Hanford Site Development Plan

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  12. US ITER Management Plan

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  13. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    NONE

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  14. Hanford Waste Vitrification Plant applied technology plan

    Kruger, O.L.

    1990-09-01

    This Applied Technology Plan describes the process development, verification testing, equipment adaptation, and waste form qualification technical issues and plans for resolution to support the design, permitting, and operation of the Hanford Waste Vitrification Plant. The scope of this Plan includes work to be performed by the research and development contractor, Pacific Northwest Laboratory, other organizations within Westinghouse Hanford Company, universities and companies with glass technology expertise, and other US Department of Energy sites. All work described in this Plan is funded by the Hanford Waste Vitrification Plant Project and the relationship of this Plan to other waste management documents and issues is provided for background information. Work to performed under this Plan is divided into major areas that establish a reference process, develop an acceptable glass composition envelope, and demonstrate feed processing and glass production for the range of Hanford Waste Vitrification Plant feeds. Included in this work is the evaluation and verification testing of equipment and technology obtained from the Defense Waste Processing Facility, the West Valley Demonstration Project, foreign countries, and the Hanford Site. Development and verification of product and process models and other data needed for waste form qualification documentation are also included in this Plan. 21 refs., 4 figs., 33 tabs

  15. Integrated Planning: Why is it so hard?

    Hesser, A.

    1994-01-01

    In this paper, the Manager of Planning integration at DOE-Richland and the Program Manager for Hanford Mission Planning at Pacific Northwest Laboratory and Westinghouse Hanford Company describe some of the reasons why integrated planning is so hard and what can be done to correct the situation. The authors use experiences from the last three years at Hanford to illustrate some of the difficulties in site integrated planning. The authors argue that integrated planning was not a major part of the previous diverse Site missions, but the change of mission has not resulted in a corresponding change of attitude about the need for such planning. Moreover, the DOE-RL staff is not structured or manned for planning, and a site perspective is the exception, rather than the norm. Contributing to this situation is the compartmentalization of funding and decision making and the diffusion of responsibility. The decision-making process at DOE sites is often not clear because of the evolving role of stakeholders, and agencies outside the DOE, especially regulators, are co-decision makers. The regulatory process and the requirements of environmental impact statements contribute to the diffusion of authority

  16. Automating Space Station operations planning

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  17. 77 FR 55168 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    2012-09-07

    ... Pollution Control Board or by the permittee. Actions to combine permit terms and conditions must include a... submitted by VADEQ for approval into the SIP were adopted by the State Air Pollution Control Board on June 8... prompt and appropriate measures to remedy the violations. Virginia's Voluntary Environmental Assessment...

  18. 76 FR 54706 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    2011-09-02

    ... such violations to the Commonwealth and takes prompt and appropriate measures to remedy the violations...).) List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  19. 76 FR 29686 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    2011-05-23

    ... evaluation and voluntarily discloses such violations to the Commonwealth and takes prompt and appropriate... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations...

  20. 77 FR 75380 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    2012-12-20

    ... and takes prompt and appropriate measures to remedy the violations. Virginia's Voluntary Environmental... 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference...

  1. Army Active/Reserve Mix; Force Planning for Major Regional Contingencies

    Sortor, Ronald

    1995-01-01

    .... However, for operations other than war-such as Somalia, Haiti, and potentially the Balkans or other trouble spots-the Army may not be able to call on the reserve components for frequent or extended deployments...

  2. Emergency planning lessons learned from a review of past major radiological accidents

    Stephan, J.G.; Selby, J.M.; Martin, J.B.; Moeller, D.W.; Vallario, E.J.

    1988-01-01

    In examining a range of nuclear accidents from the 1950s to the present that were reported in the literature, the authors have identified a number of contributing factors which affected human judgement during these events. One common thread found in a large number of accidents is the time of occurrence; a second is the adequacy of emergency training. The data show that events, whether severe accidents or operational incidents, appear to occur more frequently during off-normal hours such as the early morning shift, weekends, or holidays. Accidents seldom occur during the day shift when the full management team and senior operations personnel are present. As a result, those facility employees most expert in coping with the situation may not be available, and the normal chain of command may be disrupted. At several nuclear power plants, it was also observed that new or less experienced technicians are often assigned to night shifts. The lack of experienced human resources and the pressure of an accident situation can have an adverse impact on individuals who are faced with making important decisions

  3. Clinical Reasoning in the Assessment and Intervention Planning for Major Depression

    Hanchon, Timothy A.; Phelps, Kenneth W.; Fernald, Lori N.; Splett, Joni W.

    2017-01-01

    Accurate assessment and effective treatment of mood disorders, particularly depression, is critically important for the millions of youth who are experiencing such symptomatology and who are at risk for a multitude of deleterious outcomes. Although the extant empirical literature provides substantial guidance for the assessment and treatment of…

  4. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  5. An Examination of Family Physicians Plan Implementation in Rural ...

    Background: Family physician plan (FPP) and referral system (RS) is one of the major plans in Iran's health system with the aim of increasing the accountability in the health market, enhancing the public's access to the health services, lowering the unnecessary costs and equitable distribution of health across the society.

  6. Beyond the Inventory: Planning for Campus Greenhouse Gas Reduction

    Willson, Richard

    2010-01-01

    Climate change planning is fast becoming an important element in university policy and governance. As the causes and impacts of global climate change become more apparent, many universities are embracing climate planning roles as community leaders, educators and researchers, and operators of major activity centers. For example, 685 university…

  7. Corpus Planning for the Southern Peruvian Quechua Language.

    Coronel-Molina, Serafin M.

    1997-01-01

    The discussion of corpus planning for the Southern Quechua language variety of Peru examines issues of graphization, standardization, modernization, and renovation of Quechua in the face of increasing domination by the Spanish language. The efforts of three major groups of linguists and other scholars working on language planning in Peru, and the…

  8. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  9. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  10. The Strategic Plan and Local Economic Development of Cordoba, Argentina

    R. Vanella (Ricardo); C. Lucca (Carlos); J.R. Pittari (Jorge Romero); F. Steinberg (Florian); Zwanenburg Maria Zwanenburg (M.)

    2001-01-01

    textabstractThe Strategic Plan of Cordoba (SPC) is one of the few strategic urban development plans in Latin America, which has actually been implemented in the majority of its components. The SPC was conceived as a collective and global project of the city as a whole without excessive conflicting

  11. Congressional hearing reviews NSF major research and facilities projects

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  12. Major customer accounts - strategic alliances for the future

    Shields, R.G.; Ricker, S.M.

    1990-01-01

    As electric utilities look to the future, they are forecasting a need for increased power supply capacity to meet load requirements. But rather than focus solely on the construction of new generating capacity, many utilities facing supply shortages have sought to develop and apply peak shaving and load shifting techniques. They commonly evaluate both new generation and demand side management (DSM) as alternative options in an integrated, least-cost planning approach. Demand side management poses new challenges for utilities because for demand side management to be successful, the product needs to be sold to customers. Gone are the days when a utility simply had to market a single product - electricity. Today, supply planning and marketing organizations need to form an integrated approach to furthering a company's DSM objectives and to bring marketing concepts to this process. This paper does not attempt to argue the pros and cons of demand side management, nor to identify the right DSM alternatives. Rather, the authors focus on issues utilities must address in implementing DSM: (1) value and means of forming strategic alliances with major utility customers if a utility is going to be able to perform in an increasingly competitive environment in the future; (2) critical success factors for an effective DSM program targeted at major utility customers; and (3) necessity of applying key marketing principles to DSM program design and implementation

  13. Radioactive waste management plan. Plan 82

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  14. Majorization arrow in quantum-algorithm design

    Latorre, J.I.; Martin-Delgado, M.A.

    2002-01-01

    We apply majorization theory to study the quantum algorithms known so far and find that there is a majorization principle underlying the way they operate. Grover's algorithm is a neat instance of this principle where majorization works step by step until the optimal target state is found. Extensions of this situation are also found in algorithms based in quantum adiabatic evolution and the family of quantum phase-estimation algorithms, including Shor's algorithm. We state that in quantum algorithms the time arrow is a majorization arrow

  15. Performance profiles of major energy producers 1989

    1991-01-23

    Performance Profiles of Major Energy Producers 1989 is the thirteenth annual report of the Energy Information Administration's (EIA) Financial Reporting System (FRS). The report examines financial and operating developments, with particular reference to the 23 major energy companies (the FRS companies'') required to report annually on Form EIA-28. Financial information is reported by major lines of business including oil and gas production, petroleum refining and marketing, and other energy operations. Domestic and international operations are examined separately in this report. It also traces key developments affecting the financial performance of major energy companies in 1989, as well as review of important trends.

  16. Performance profiles of major energy producers, 1991

    1992-01-01

    Performance Profiles of Major Energy Producers 1991 is the fifteenth annual report of the Energy Information Administration's (EIA) Financial Reporting System (FRS). The report examines financial and operating developments, with particular reference to the 23 major energy companies (the FRS companies) required to report annually on Form EIA-28. It also traces key developments affecting the financial performance of major energy companies in 1991, as well as reviews important trends. Financial information is reported by major lines of business including oil and gas production, petroleum refining and marketing, and other energy operations. Domestic and international operations are examined separately in this report

  17. Air quality management planning (AQMP

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  18. EMI Registry Development Plan

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  19. Technology Planning Strategies

    Decker, Kathy

    2004-01-01

    Effective planning strategies drive achievement of an overall technology goal to increase access to electronic information in real time in order to increase efficiency, productivity, and communication across campus. Planning relies on providing access, 'Anytime Anywhere' to student information, calendar, email, course management tools, and the…

  20. A landscape analysis plan

    Nancy E. Fleenor

    2002-01-01

    A Landscape Analysis Plan (LAP) sets out broad guidelines for project development within boundaries of the Kings River Sustainable Forest Ecosystems Project. The plan must be a dynamic, living document, subject to change as new information arises over the course of this very long-term project (several decades). Two watersheds, each of 32,000 acres, were dedicated to...

  1. Implementing a Capital Plan.

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  2. Statistical Analysis Plan

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  3. Jobs Plan Highlights Education

    Klein, Alyson

    2011-01-01

    President Barack Obama is putting new money to save educators' jobs and help states refurbish aging school facilities at the center of a nearly $450 billion plan to jump-start the sluggish economy. The author talks about the president's plan which is sure to face hurdles in a politically polarized Washington where one house of Congress is…

  4. A Process for Planning.

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  5. Environmental protection Implementation Plan

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  6. Natural Resource Management Plan

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  7. Temporal logic motion planning

    Seotsanyana, M

    2010-01-01

    Full Text Available In this paper, a critical review on temporal logic motion planning is presented. The review paper aims to address the following problems: (a) In a realistic situation, the motion planning problem is carried out in real-time, in a dynamic, uncertain...

  8. Creating a Marketing Plan.

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  9. Planning for College Success

    PEPNet, 2009

    2009-01-01

    "Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…

  10. Sales and operations planning

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  11. Sales and operations planning

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  12. Can Complexity be Planned?

    Ilona Koutny

    2015-04-01

    Full Text Available The long accepted complexity invariance of human languages has become controversial within the last decade. In investigations of the problem, both creole and planned languages have often been neglected. After a presentation of the scope of the invariance problem and the proposition of the natural to planned language continuum, this article will discuss the contribution of planned languages. It will analyze the complexity of Esperanto at the phonological, morphological, syntactic and semantic levels, using linguistic data bases. The role of the L2 speech community and development of the language will also be taken into account when discussing the endurance of the same level of simplicity of this planned international language. The author argues that complexity can be variable and to some extent planned and maintained.

  13. Health Workforce Planning

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  14. Framework for Maintenance Planning

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  15. Effective Hull IMMR plan

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  16. Emergency plan belgian experience

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  17. Planning and Foucault

    Flyvbjerg, Bent; Richardson, Tim

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on "what is actually...... done", as opposed to Habermas`  focus on "what should be done". We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  18. Planning and Foucault

    Flyvbjerg, Bent; Richardson, Tim

    2002-01-01

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on ?what is actually...... done?, as opposed to Habermas?s focus on ?what should be done?. We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  19. The 1986 action plan

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  20. Imaging of the major salivary glands

    Afzelius, Pia; Nielsen, Ming-Yuan; Ewertsen, Caroline

    2016-01-01

    The major salivary glands, submandibular, parotid and sublingual glands play an important role in preserving the oral cavity and dental health. Patients with problems of the major salivary glands may present with symptoms such as dry mouth, dysphagia and obstruction of duct, inflammation, severe...

  1. Work Values and College Major Choice

    Balsamo, Michela; Lauriola, Marco; Saggino, Aristide

    2013-01-01

    Our study sought to clarify the nature of the known individual differences in work values associated with academic college major choice, specifically the question whether these precede or follow the choice of an academic major. To rule out environmental influences during academic study, group differences in five value orientations were evaluated…

  2. Test for English Majors (TEM) in China

    Jin, Yan; Fan, Jinsong

    2011-01-01

    The purpose of the Test for English Majors (TEM) is to measure the English proficiency of Chinese university undergraduates majoring in English Language and Literature and to examine whether these students meet the required levels of English language abilities as specified in the National College English Teaching Syllabus for English Majors…

  3. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  4. Evaluating California local land use plan's environmental impact reports

    Tang Zhenghong; Bright, Elise; Brody, Samuel

    2009-01-01

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure

  5. Great Ellipse Route Planning Based on Space Vector

    LIU Wenchao

    2015-07-01

    Full Text Available Aiming at the problem of navigation error caused by unified earth model in great circle route planning using sphere model and modern navigation equipment using ellipsoid mode, a method of great ellipse route planning based on space vector is studied. By using space vector algebra method, the vertex of great ellipse is solved directly, and description of great ellipse based on major-axis vector and minor-axis vector is presented. Then calculation formulas of great ellipse azimuth and distance are deduced using two basic vectors. Finally, algorithms of great ellipse route planning are studied, especially equal distance route planning algorithm based on Newton-Raphson(N-R method. Comparative examples show that the difference of route planning between great circle and great ellipse is significant, using algorithms of great ellipse route planning can eliminate the navigation error caused by the great circle route planning, and effectively improve the accuracy of navigation calculation.

  6. 14 CFR Appendix B to Part 43 - Recording of Major Repairs and Major Alterations

    2010-01-01

    ... inspected. (d) For extended-range fuel tanks installed within the passenger compartment or a baggage... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Recording of Major Repairs and Major... to Part 43—Recording of Major Repairs and Major Alterations (a) Except as provided in paragraphs (b...

  7. Subprime Rescue Plans: Backdoor Bank Bailouts

    Dean Baker

    2008-01-01

    This report analyzes recent proposals suggesting that the government buy up or guarantee bad mortgage debt in an attempt to slow the increasing number of foreclosures the nation has seen in the wake of the housing market's meltdown. The study, which focuses on the plan put forth by the Office of Thrift Supervision, shows that banks and mortgage holders end up being the true beneficiaries of such plans at the expense of taxpayers and with few gains for the majority of homeowners currently faci...

  8. Clinical treatment planning in gynecologic cancer

    Brady, L.W.; Markoe, A.M.; Micaily, B.; Damsker, J.I.; Karlsson, U.L.; Amendola, B.E.

    1987-01-01

    Treatment planning in gynecologic cancer is a complicated and difficult procedure. It requires an adequate preoperative assessment of the true extent of the patient's disease process and oftentimes this can be achieved not only by conventional studies but must employ surgical exploratory techniques in order to truly define the extent of the disease. However, with contemporary sophisticated treatment planning techniques that are now available in most contemporary departments of radiation oncology, radiation therapy is reemerging as an important and major treatment technique in the management of patients with gynecologic cancer

  9. A Lesson Plan Incorporating Collaborative Strategic Reading

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen-sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo-cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  10. A Lesson Plan Incorporating Collaborative Strategic Reading

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen?sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo?cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  11. Fast Generation of Container Vessel Stowage Plans

    Pacino, Dario

    that the vessel is stable and seaworthy, and at the same time arrange the cargo such that the time at port is minimized. Moreover, stowage coordinators only have a limited amount of time to produce the plan. This thesis addresses the question of whether it is possible to automatically generate stowage plans...... test instances provided by a major liner shipping company. Improvements to the modeling of vessel stability and an analysis of its accuracy together with an analysis of the computational complexity of the container stowage problem are also included in the thesis, resulting in an overall in...

  12. Hydro-Quebec : positioning and strategic planning

    Lanoue, R.

    1998-01-01

    Hydro-Quebec's corporate concerns for 1998-2002 were highlighted. The Corporation's strategic plan envisages that within the next decade, the utility will boost sales by 25 per cent with an investment of $13.2 billion in new generation projects. The electric utility plans to build on past experience and maintain its electricity rates and service quality. Sustaining environmental quality while developing into a world class enterprise remains a major objective of the utility. Research and development will also continue to be an integral part of the utility's operations. Tabs., figs

  13. Assessment of LANL waste minimization plan

    Davis, K.D.; McNair, D.A.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to evaluate the Los Alamos National Laboratory (LANL) Waste Minimization Plan to determine if it meets applicable internal (DOE) and regulatory requirements. The intent of the effort is to assess the higher level elements of the documentation to determine if they have been addressed rather than the detailed mechanics of the program's implementation. The requirement for a Waste Minimization Plan is based in several DOE Orders as well as environmental laws and regulations. Table 2-1 provides a list of the major documents or regulations that require waste minimization efforts. The table also summarizes the applicable requirements

  14. 24 Command Fire Improvement Action Program Plan

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  15. US Strategic Plan: two years on

    Anon.

    1992-01-01

    In the two years since it issued its Strategic Plan for Building New Nuclear Power Plants, the US nuclear power industry says significant progress has been achieved. The plan's major points call for completing the engineering for advanced reactor designs over the next five years; identifying suitable sites for new nuclear plants; achieving stable regulatory conditions so investors can be assured of earning a fair return on financing for new plants; improving the performance of existing nuclear plants; resolving the waste problems; and improving public acceptance of nuclear power. (author)

  16. Fiscal planning of private electricity production projects

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  17. Extension planning for electrical energy supply systems

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  18. FY 2001 Hanford Waste Management Strategic Plan

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  19. Supply chain planning classification

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  20. Public affairs plan

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  1. Personal strategic planning

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  2. Public affairs plan

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  3. National Energy Plan II

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  4. Performance profiles of major energy producers 1992

    1994-01-01

    Performance Profiles of Major Energy Producers 1992 is the sixteenth annual report of the Energy Information Administration's (EIA) Financial Reporting System (FRS). The report examines financial and operating developments, with particular reference to the 25 major energy companies (the FRS companies) required to report annually on Form EIA-28. Financial information is reported by major lines of business, including oil and gas production, petroleum refining and marketing, and other energy operations. Domestic and international operations are examined separately in this report. The data are presented in the context of key energy market developments with a view toward identifying changing strategies of corporate development and measuring the apparent success of current ongoing operations

  5. Inequalities theory of majorization and its applications

    Olkin, Ingram

    1980-01-01

    Although they play a fundamental role in nearly all branches of mathematics, inequalities are usually obtained by ad hoc methods rather than as consequences of some underlying ""theory of inequalities."" For certain kinds of inequalities, the notion of majorization leads to such a theory that is sometimes extremely useful and powerful for deriving inequalities. Moreover, the derivation of an inequality by methods of majorization is often very helpful both for providing a deeper understanding and for suggesting natural generalizations.Anyone wishing to employ majorization as a tool in applicati

  6. Performance profiles of major energy producers 1994

    NONE

    1996-02-01

    Performance Profiles of Major Energy Producers 1994 is the eighteenth annual report of the Energy Information Administration`s (EIA) Financial Reporting System (FRS). The report examines financial and operating developments in energy markets, with particular reference to the 24 major U.S. energy companies required to report annually on Form EIA-28. Financial information is reported by major lines of business, including oil and gas production, petroleum refining and marketing, other energy operations, and nonenergy businesses. Financial and operating results are presented in the context of energy market developments with a view toward identifying changing corporate strategies and measuring the performance of ongoing operations both in the United States and abroad.

  7. Performance profiles of major energy producers 1979

    1981-07-01

    The purpose of this report is to examine year-to-year developments in the operations of 26 major US energy companies on a corporate level and also by major line of energy business and by major functions within each line of business. The period covered is 1977 to 1979. Comparisons of income and investment flow are featured and related to functionally allocated net investment in place. The presentation seeks to identify similarities and dissimilarities in results across lines-of-business activity or by firm size

  8. Parking management : strategies, evaluation and planning

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  9. Planning for the future.

    Stiewing, Janis

    2002-01-01

    Revising the strategic plan was the beginning of a multiyear initiative that will determine the path of the JRCERT. The key word in the preceding statement is beginning. The strategic plan is an ever-changing document. Although some components, such as the values statements, will stand over time, other components will change as accreditation and educational arenas change. That is the paradox of strategic planning: Remaining true to the vision, values and mission statements requires knowing when to change to keep the JRCERT aligned with the responsive to its communities of interest.

  10. Heat pump planning handbook

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  11. Sea materials experimental plans

    1987-07-01

    This Seal Materials Performance Test Plan describes the plan for testing materials that will be used to seal a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The need for sealing and backfilling the repository and the use of various sealing materials are described. The seal materials include mined salt backfills, cementitious bulkheads and plugs, and earthen backfills. The laboratory testing program for characterizing the behavior and performance of these materials is described. This report includes plans for screening materials, evaluating candidate materials to be tested, and testing a representative set of materials

  12. Business Plan: Elpis Restaurant

    Tran, Luu Quoc Phong

    2016-01-01

    The purpose of this Bachelor’s thesis is to create a business plan for starting up a restaurant in European – Asian style in Helsinki. While the restaurants are in European or Asian style separately, this restaurant will be unique with dishes which are based on local traditional dishes, traditional Asian dishes and mixture between them as well as creation of new dishes. This business plan is created to minimize the risk when starting up a restaurant. The plan will not only help the restaur...

  13. Environmental monitoring plan

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  14. The Past, Present, and Future of Discharge Planning in Taiwan

    Shu-Chuan Lin

    2013-06-01

    Full Text Available Discharge planning is an interdisciplinary approach to provide continuity of care; it is a process that includes identification, assessment, goal setting, planning, implementation, coordination, and evaluation. Discharge planning has been viewed as a major way to enhance a smooth transition for patients from the hospital to home or other chronic care units and as a solution to solve problems associated with postdischarge care. The promotion of discharge planning began in the United States in the 1960s. Nursing scholars from Taiwan learned about the concept of discharge planning from the United States in the early 1980s and subsequently introduced it to Taiwanese medical institutions in 1985. A policy to promote discharge planning in Taiwan was announced by the Executive Yuan, Department of Health in 1993. Following the healthcare reforms in 1995, discharge planning has since been strongly promoted. Studies concerning discharge planning in Taiwan showed some promising results, including increased satisfaction of patients and their families, improved preparation of caregivers, and improved quality of life for patients. However, patients receiving interdisciplinary discharge planning services were still in the minority. There was no standard evaluation procedure for interdisciplinary discharge planning, and a high percentage of patients thought that hospitals handled the postdischarge long-term care services referral procedure inadequately. Despite the positive attitudes toward discharge planning, many physicians still demonstrate an unsatisfactory level of knowledge and behaviors with regard to discharge planning. To enhance the implementation of discharge planning, a standard evaluation procedure for interdisciplinary discharge planning and improved physician awareness concerning the importance of discharge planning are needed. In Taiwan, the improvement of discharge planning in the foreseeable future is promising with the accreditation of the

  15. Financial planning considerations at retirement.

    Cole, R J

    1998-03-01

    The process of retirement planning is a difficult one for a physician. The Planning process should address the areas of Investment Planning, Estate Planning, and Risk Management. This article examines each of these dimensions with special emphasis on Modern Portfolio Theory as the basis for investment planning.

  16. What's an Asthma Action Plan?

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  17. MIPPA: First Broad Changes to Medicare Part D Plan Operations.

    LeMasurier, Jean D; Edgar, Babette

    2009-04-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.

  18. Teaching planning theory as planner roles in urban planning education

    Olesen, Kristian

    2018-01-01

    Planning theory is often portrayed as a subject that urban planning students find too abstract and fail to see the relevance of. This paper advocates the perspective that planning theory can be made more student-friendly. This requires, firstly, that academic discussions about the relevance...... of planning theory for urban planning practice are integrated into the course module. If students are to appreciate planning theory, it requires that they understand how planning theory can inspire planning practice. Secondly, it requires careful considerations to the pedagogy of planning theory. The paper...... suggests that teaching planning theory as a variety of planner roles offers a helpful pedagogical approach for helping students construct their identities as urban planners. The paper builds on the author’s own experiences of teaching planning theory in a master’s urban planning programme, and has been...

  19. Role of regional planning organizations in transportation planning across boundaries

    2014-06-11

    The Volpe Center conducted research for the Federal Highway Administration Office of Planning that explores the implications of Regional Planning Organizations (RPO) engaging in transportation planning partnerships and projects of megaregions signifi...

  20. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  1. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  2. Corporate plan 1994/95 to 1998/99

    1994-04-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970. As with all non-departmental public bodies it is required to prepare a Corporate Plan against which its performance and the relevance of its activities to contemporary requirements can be measured. The Board has produced annual Corporate Plans since 1986. In this issue, summary sections on background, objectives, and finances are followed by fifteen sections describing the major areas of work in a structured manner with the Plan objectives, achievements, and alterations set out. Altogether, the Plan shows a good level of attainment and a clear sense of direction. (author)

  3. Facility effluent monitoring plan determinations for the 400 Area facilities

    Nickels, J.M.

    1991-09-01

    This Facility Effluent Monitoring Plan determination resulted from an evaluation conducted for the Westinghouse Hanford Company 400 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans. Two major Westinghouse Hanford Company facilities in the 400 Area were evaluated: the Fast Flux Test Facility and the Fuels Manufacturing and examination Facility. The determinations were prepared by Westinghouse Hanford Company. Of these two facilities, only the Fast Flux Test Facility will require a Facility Effluent Monitoring Plan. 7 refs., 5 figs., 4 tabs

  4. Industrial developments challenging planning and research endeavours around Songkla Lake

    Jørgensen, Ulrik; Lauridsen, Erik Hagelskjær

    2004-01-01

    had several broad committees engaged in supporting these planning issues and resolve the conflicts be-tween different stakeholder interests in the regions development. The paper gives an overview over the types of problems that have been addressed in these major plans and studies and the types......, but the specific outcomes of the planning and the scientific result seem to be rather limited. In an attempt to find an explanation to this gap between planning and advice on one hand and the implementation on the other, it is important not only to look for policy answers. These would typically be ‘lack...

  5. Performance profiles of major energy producers 1993

    NONE

    1995-01-01

    Performance Profiles of Major Energy Producers 1993 is the seventeenth annual report of the Energy Information Administration`s (EIA) Financial Reporting System (FRS). The report examines financial and operating developments in energy markets, with particular reference to the 25 major US energy companies required to report annually on Form EIA-28. Financial information is reported by major liens of business, including oil and gas production, petroleum refining and marketing, other energy operations, and nonenergy businesses. Financial and operating results are presented in the context of energy market developments with a view toward identifying changing corporate strategies and measuring the performance of ongoing operations both in the US and abroad. This year`s report analyzes financial and operating developments for 1993 (Part 1: Developments in 1993) and also reviews key developments during the 20 years following the Arab Oil Embargo of 1973--1974 (Part 2: Major Energy Company Strategies Since the Arab Oil Embargo). 49 figs., 104 tabs.

  6. Major Development Communication Paradigms and Practices ...

    info

    major paradigms of development and communication practices on graphic ... mobilize, educate and persuade target audience to support human development ... facilitates the understanding of the themes, issues and facts of a campaign.

  7. Data Sets from Major NCI Initiaves

    The NCI Data Catalog includes links to data collections produced by major NCI initiatives and other widely used data sets, including animal models, human tumor cell lines, epidemiology data sets, genomics data sets from TCGA, TARGET, COSMIC, GSK, NCI60.

  8. Performance profiles of major energy producers 1996

    1998-01-01

    This publication examines developments in the operations of the major US e energy-producing companies on a corporate level, by major line of business, by major function within each line of business, and by geographic area. In 1996, 24 companies filed Form EIA-28. The analysis and data presented in this report represents the operations of the Financial Reporting System companies in the context of their worldwide operations and in the context of the major energy markets which they serve. Both energy and nonenergy developments of these companies are analyzed. Although the focus is on developments in 1996, important trends prior to that time are also featured. Sections address energy markets in 1996; key financial developments; oil and gas exploration, development, and production; downstream petroleum in 1996; coal and alternative energy; and foreign direct investment in US energy. 30 figs., 104 tabs

  9. Performance profiles of major energy producers 1996

    NONE

    1998-01-01

    This publication examines developments in the operations of the major US e energy-producing companies on a corporate level, by major line of business, by major function within each line of business, and by geographic area. In 1996, 24 companies filed Form EIA-28. The analysis and data presented in this report represents the operations of the Financial Reporting System companies in the context of their worldwide operations and in the context of the major energy markets which they serve. Both energy and nonenergy developments of these companies are analyzed. Although the focus is on developments in 1996, important trends prior to that time are also featured. Sections address energy markets in 1996; key financial developments; oil and gas exploration, development, and production; downstream petroleum in 1996; coal and alternative energy; and foreign direct investment in US energy. 30 figs., 104 tabs.

  10. April 2006. 32 Major Orthopaedic Procedures

    user

    2006-04-01

    Apr 1, 2006 ... Major Orthopaedic Procedures: 17 Year Trends. Biruk Lambisso Wamisho1 ... financial and logistic constraints with poor compliance of ... Modern orthopaedic surgery is very expensive. A highly ..... Case management. Tribury.

  11. Dynamics of Major Cereals Productivity in Nepal

    Samaya Gairhe

    2018-05-01

    Full Text Available Cereal crops have played major roles in addressing food security issues in Nepal. In recent years there have been fluctuations in crop production and demands situations due to various reasons. Thus, the present study aims to analyze the dynamics of major cereals productivity in Nepal from 1995 to 2014. Focus group discussions were done in mid-hills and tarai of Nepal in 2015. Percentage change, compound growth rate, annual rate of change, coefficient of variation, instability index were calculated to analyze results. The result shows that the area, production and productivity of major cereals had an increasing trend over the study period. The major factors contributing on productivity increase in cereal crops were irrigation facilities, use of improved and hybrid seeds, chemical fertilizer and better technical knowhow among the farmers. For effective adoption of research outputs to improve the productivity emphasis should also be given on promotion of public private partnership (PPP in research and development.

  12. Major Benno Leesiku mälestuseks

    2010-01-01

    Järelehüüe 2006. aastal surnud Kaitseliidu juhile, Eesti Laskurliidu asepresidendile ja võimlemistreenerite klubi Kartek presidendile major Benno Leesikule, kes oleks 17. jaanuaril 2010. aastal saanud 50-aastaseks

  13. Characterizing the epistemological development of physics majors

    Elizabeth Gire

    2009-02-01

    Full Text Available Students in introductory physics courses are likely to have views about physics that differ from those of experts. However, students who continue to study physics eventually become experts themselves. Presumably these students either possess or develop more expertlike views. To investigate this process, the views of introductory physics students majoring in physics are compared with the views of introductory physics students majoring in engineering. In addition, the views of physics majors are assessed at various stages of degree progress. The Colorado learning attitudes about science survey is used to evaluate students’ views about physics, and students’ overall survey scores and responses to individual survey items are analyzed. Beginning physics majors are significantly more expertlike than nonmajors in introductory physics courses, and this high level of sophistication is consistent for most of undergraduate study.

  14. Coherence for vectorial waves and majorization

    Luis, Alfredo

    2016-01-01

    We show that majorization provides a powerful approach to the coherence conveyed by partially polarized transversal electromagnetic waves. Here we present the formalism, provide some examples and compare with standard measures of polarization and coherence of vectorial waves.

  15. Researchers Realize Major Breakthrough in Understanding Endometriosis

    ... 16, 2014 Researchers Realize Major Breakthrough in Understanding Endometriosis For a disease that affects an estimated 6 ... 10% of women, surprisingly little is known about endometriosis — a disorder that causes uterine tissue to grow ...

  16. Disturbances in equilibrium function after major earthquake.

    Honma, Motoyasu; Endo, Nobutaka; Osada, Yoshihisa; Kim, Yoshiharu; Kuriyama, Kenichi

    2012-01-01

    Major earthquakes were followed by a large number of aftershocks and significant outbreaks of dizziness occurred over a large area. However it is unclear why major earthquake causes dizziness. We conducted an intergroup trial on equilibrium dysfunction and psychological states associated with equilibrium dysfunction in individuals exposed to repetitive aftershocks versus those who were rarely exposed. Greater equilibrium dysfunction was observed in the aftershock-exposed group under conditions without visual compensation. Equilibrium dysfunction in the aftershock-exposed group appears to have arisen from disturbance of the inner ear, as well as individual vulnerability to state anxiety enhanced by repetitive exposure to aftershocks. We indicate potential effects of autonomic stress on equilibrium function after major earthquake. Our findings may contribute to risk management of psychological and physical health after major earthquakes with aftershocks, and allow development of a new empirical approach to disaster care after such events.

  17. Major dealers' expert power in distribution channels

    Richard Chinomona; Marius Pretorius

    2011-01-01

    The importance of major dealers' expertise in distribution channels and effects on exchange relations is widely acknowledged by many SMEs in Africa and yet there seem to be a paucity of research on this matter. To address this dearth, the current study attempts to examine the relationship between major dealers' expert power and SME manufacturers' channel cooperation and the mediating influence of their trust, relationship commitment and satisfaction. The conceptualized model and five hypothes...

  18. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  19. The pectoralis major footprint: An anatomical study

    Eduardo Antonio de Figueired

    2013-12-01

    Full Text Available Objective: To study the insertion of the pectoralis major tendon to the humerus, through knowledge of its dimensions in the coronal and sagittal planes. Methods: Twenty shoulders from 10 cadavers were dissected and the pectoralis major tendon insertion on the humerus was identified and isolated. The dimensions of its "footprint" (proximal to distal and medial to lateral borders and the distance from the top edge of the pectoralis major tendon to apex of the humeral head structures were measured. Results: The average proximal to distal border length was 80.8 mm (range: 70 -90 and the medial-to-lateral border length was 6.1 mm (5 -7. The average distance (and range from the apex of the pectoralis major tendon to the humeral head was 59.3 mm. Conclusions: We demonstrate that the insertion of the pectoralis major tendon is laminar, and the pectoralis major tendon has an average footprint height and width of 80.8 mm and 6.1 mm, respectively.

  20. Speed management program plan.

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...