WorldWideScience

Sample records for major technical issues

  1. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Choi, J. T.; Kim, I. J. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1998-06-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are as follows : reliability of risk significant SSCs established during design stage must be maintained through the operating life of the plant, currently used classification method of plant conditions and safety requirement were reviewed, and a quantitative classification method is needed to be developed further, the basic regulatory directions are proposed for multiple failures such as SBO, TLOFW, multiple SGTR and ATWS, safety requirements are proposed for survivability/availability of severe accident mitigation design features by 5 items if basic requirements, selection of initial event, identification of available equipment and instruments, identification of environmental conditions and verification methods.

  2. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Oh, S. H.; Kang, H. J.; Kim, G. S. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H.; Jeong, Y. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1999-02-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are are as follows : related to the classification and acceptance criteria of plant conditions, currently used classification and safety requirement were reviewed and regulatory direction was proposed. Among multiple failures, it is identified that SBO, TLOFW, multiple SGTR and ATWS are basically to be considered for additional requirements for advanced reactors. This study reviewed risk aspects, design consideration, and trends of safety requirements, and proposed fundamental safety requirements to be applied for KNGR. Multiple steam generator tube failure is a significant safety concern because of the possibility of release of radionuclides to the environment through containment bypass. Proposed safety requirement for this event can be categorized mainly as analysis requirement, design evaluation requirement and PSA requirement; For protection of containment failure, a reasonable safety position is necessary through and integrated review of possibility of severe accident occurrence, effects of sever accident mitigation features and cost effects of these design features. With this consideration safety requirements developed are the analysis requirement, provision of protective measures and survivability/availability of protective measures.

  3. Technical issues for WIPP

    International Nuclear Information System (INIS)

    Hunter, T.O.

    1979-01-01

    Emplacement of wastes in the WIPP will include experiments on various waste types which will provide essential data on waste-rock interaction and repository response. These experiments will include evolution of the synergistic effects of both heat production, radiation, and actual waste forms. While these studies will provide essential data on the validity of waste isolation in bedded salt, they will be preceded by a broad-based experimental program which will resolve many of the current technical issues providing not only an assessment of the safety of performing such experiments but also the technical basis for assurance that the appropriate experiments are performed. Data and predictive modeling techniques, which are currently available, can bound the consequences associated with these technical issues. Predictions of the impact on public safety based on these analyses indicate that safe waste disposal in WIPP salt beds is achievable; however, a major use of WIPP will be to conduct realistic experiments with HLW forms to address some of the unresolved details of these waste/salt interactions

  4. Technical review of externalities issues. Final report

    International Nuclear Information System (INIS)

    Niemeyer, V.

    1994-12-01

    Externalities has become the catchword for a major experiment in electric utility regulation. Together with increased competition as a means for economic regulation, this experiment represents a potential revolution in how electric utilities are regulated. It is very important for utilities and policy makers to understand the technical issues and arguments driving the externality experiment. This Technical Review presents four papers covering topics in economics that may play important roles in this revolution. The four papers are: Economic Issues in the Application of Externalities to Electricity Resource Selection; Climate Change, the Marginal Cost of Carbon Dioxide Emissions and the Implications for Carbon Dioxide Emissions Adders; Positive Externalities and Benefits from Electricity; and Socioeconomic Effects of Externality Adders for Electric Utility Emissions

  5. Major issues in the training of security personnel

    International Nuclear Information System (INIS)

    Knauf, W.M.; Robertson, L.P.

    1982-01-01

    The effectiveness of the response component of a physical protection system depends greatly upon the training received by the security personnel. The issues and problems in the area of training which were of greatest concern to the attendees of the 1980 and 1981 INMM sponsored Technical Workshops on Guard Training are discussed. The attendees were training supervisors of managers of security personnel and represented a variety of organizations and companies including DOE facilities, NRC licensees, the military, private security contractors, and governmental agencies. Major categories of concern include: professionalism in security, legal constraints and obligations, physical and psychological testing and standards, governmental requirements, morale and motivation, and tactical training techniques

  6. Pipeline abandonment - a discussion paper on technical and environmental issues

    International Nuclear Information System (INIS)

    1996-11-01

    The technical and environmental issues associated with pipeline abandonment were reviewed to provide a basis for the development of guidelines that companies could follow in order to abandon oil and gas pipelines in an environmentally safe and economic manner. Some of the topics discussed include land use management, ground subsidence, soil and groundwater contamination, erosion and the potential to create water conduits. A major issue still to be resolved, i.e., the legal and financial aspects of pipeline abandonment, was addressed. An industry-financed fund has been created to cover the cost of reclamation and abandonment of orphaned pipelines and certain associated pipeline facilities. 30 refs., 4 tabs., 3 figs

  7. Governance of Technical Education in India : Key Issues, Principles, and Case Studies

    OpenAIRE

    Blom, Andreas; Cheong, Jannette

    2010-01-01

    Tertiary education, and in particular technical and engineering education, is critical to India's aspirations of strengthening its reputation as a major competitive player in the Global knowledge economy. The system is huge and complex, and there is a consensus that reforms are imperative. Issues of fair access and affordable participation in higher education are critical if India is to em...

  8. Large Water Cherenkov Detectors - Technical Issues -

    CERN Document Server

    Aihara, H

    2010-01-01

    We address technical issues and challenges to construct a one-megaton scale water Cherenkov detector for neutrino detection. Studies presented here are mostly based on preliminary work for Hyper Kamiokande project.

  9. Technical findings and regulatory analysis for Generic Safety Issue II.E.4.3, ''Containment Integrity Check''

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1988-04-01

    This report contains the technical findings and regulatory analysis for Generic Safety Issue II.E.4.3, ''Containment Integrity Check.'' An evaluation of the containment isolation history from 1965 to 1983 reveals that (except for a small number of events) containment integrity has been maintained and that the majority of reported events have been events related to exceeding Technical Specification limits (or 0.6 of the allowable leakage level). In addition, more recent risk analyses have shown that allowable leakage rates even if increased by a factor of 10 would not significantly increase risk. Potential methods of continuous monitoring are identified and evaluated. Therefore, these technical findings and risk evaluations support closure of Generic Safety Issue II.E.4.3

  10. Current technical issues in international safeguards

    International Nuclear Information System (INIS)

    Bennett, C.A.

    1977-01-01

    Safeguards systems, and the associated need for technical and systems development, reflect changing conditions and concerns associated with the nuclear fuel cycle and the safety and security of nuclear materials and facilities. In particular, the implementation of international safeguards has led to the recognition of certain technical issues, both old and new, which are in need of resolution. These are: 1. The grading of nuclear materials and facilities with respect to their relative safeguards significance. 2. The extension and upgrading of safeguards techniques to maintain adequate protection in view of constantly increasing amounts of material to be safeguarded. 3. The balance between safeguards mechanisms based on physical protection and material accounting, and the role of surveillance and containment in each case. 4. The role of information systems as a basis for both analytical feedback and the determination of the factors affecting system effectiveness and their interrelationship. 5. A determination of the degree to which the overall technical effectiveness of international inspection activities can be quantified. Each of these technical issues must be considered in light of the specific objectives of international safeguards, which differ from domestic safeguards in terms of the level of the threat, the safeguards mechanisms available, and the diversion strategies assumed. Their resolution in this international context is essential if the effectiveness and viability of international safeguards are to be maintained

  11. Report on the Current Technical Issues on ASME Nuclear Code and Standard

    International Nuclear Information System (INIS)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2008-11-01

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  12. Issues involved in translating technical texts from English into ...

    African Journals Online (AJOL)

    Issues involved in translating technical texts from English into Northern Sotho. ... some of the problems encountered by the translator, such as the lack of equivalent technical terms in the target language. ... AJOL African Journals Online.

  13. Denmark; Systemic Issues in Mortgage Loans and Covered Bond Finance: Technical Note

    OpenAIRE

    International Monetary Fund

    2014-01-01

    This technical note analyzes systemic issues in mortgage loans and covered bond finance in Denmark. Mortgage lending has seen significant product innovation in recent years. Loans with adjustable interest rates and/or interest-only periods, which have been introduced since the late 1990s, had grown to 75 percent and 53 percent, respectively, of total outstanding mortgage loans at the end of 2013. The major changes in the characteristics of the underlying mortgage loans have naturally been ref...

  14. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Gratson, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1992-01-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the Acid Pit and Transuranic Pits and Trenches (TRU-PTs) that are present at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues exist that must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues associated with ISV application at the INEL SDA. The activities of the ISV Steering Committee are summarized in three volumes of this report. Volume 1 identifies the systematic approach used to identify and prioritize the ISV technical issues, and briefly discusses the methodology that will be employed to resolve these issues. This document Volume 2 and Volume 3 discusses each technical issue in greater detail and suggest specific closure roadmaps to be used in resolving technical issues associated with ISV at the SDA Acid Pit and TRU-PTs, respectively

  15. Vocational technical and adult education: Status, trends and issues related to electronic delivery

    Science.gov (United States)

    Rothenberg, D.

    1973-01-01

    Data are analyzed, and trends and issues are discussed to provide information useful to the systems designer who wishes to identify and assess the opportunities for large scale electronic delivery in vocational/technical and adult education. Issues connected with vocational/technical education are investigated, with emphasis on those issues in the current spotlight which are relevant to the possibilities of electronic delivery. The current role of media is examined in vocational/technical instruction.

  16. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Krisman, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1992-07-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the acid pit and transuranic pits and trenches (TRU-PTs) at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues lated with ISV application at the SDA. The activities of the ISV Steering Committee are summarized in a three-volume report. Volume I identifies the systematic approach used to identify and prioritize the ISV technical issues and briefly discusses the methodology that will be employed to resolve these issues. Volumes 2 and 3 discuss each technical issue in greater detail and suggest specific closure roadmaps to be used in resolving technical issues associated with ISV at the SDA Acid Pit and TRU-PTS, respectively. The three-volume report is a working document that will be updated as necessary to reflect current evaluation strategy for the ISV technology. This is Volume 3

  17. Technical design issues for a field-portable supercritical fluid extractor

    Energy Technology Data Exchange (ETDEWEB)

    Wright, B.W.; Zemanian, T.S.; Robins, W.H.; Wright, C.W.

    1995-01-01

    Supercritical fluid extraction is gaining acceptance as an alternative sample preparation method for trace organic analysis. The development of SFE instrumentation optimized for field use requires taking several technical design issues including size and weight requirements, user-friendly operation, and technical performance capabilities into consideration. Parameters associated with a prototype SFE instrument under development for potential use in conducting on-site inspections of the Chemical Weapons Convention and its preliminary technical and operational performance are described.

  18. Research and Development Issues for Interactive Electronic Technical Manuals

    National Research Council Canada - National Science Library

    Ricci, Katrina

    2002-01-01

    .... While there is a wide range of research issues associated with technical manuals, the focus of the Intelligent Performance Support and Training effort is the development and evaluation of various...

  19. Analysis of the Current Technical Issues on ASME Code and Standard for Nuclear Mechanical Design(2009)

    International Nuclear Information System (INIS)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2009-11-01

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  20. Analysis of the Current Technical Issues on ASME Code and Standard for Nuclear Mechanical Design(2009)

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2009-11-15

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  1. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Gratson, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1991-12-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the Acid Pit and Transuranic Pits and Trenches (TRU-PTs) that are present at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues exist that must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues associated with ISV application at the INEL SDA. The activities of the ISV Steering Committee are summarized in three volumes of this report. This document, Volume 1, identifies the systematic approach used to identify and prioritize the ISV technical issues, and briefly discusses the methodology that will be employed to resolve these issues

  2. Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2006-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool for future work package planning

  3. Technical issues in licensing low-level radioactive waste facilities

    Energy Technology Data Exchange (ETDEWEB)

    Junkert, R. [California Dept. of Health Services, CA (United States)

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  4. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  5. Introduction to the special issue on the technical status of materials for a fusion reactor

    Science.gov (United States)

    Stork, D.; Zinkle, S. J.

    2017-09-01

    Materials determine in a fundamental way the performance and environmental attractiveness of a fusion reactor: through the size (power fluxes to the divertor, neutron fluxes to the first wall); economics (replacement lifetime of critical in-vessel components, thermodynamic efficiency through operating temperature etc); plasma performance (erosion by plasma fluxes to the divertor surfaces); robustness against off-normal accidents (safety); and the effects of post-operation radioactivity on waste disposal and maintenance. The major philosophies and methodologies used to formulate programmes for the development of fusion materials are outlined, as the basis for other articles in this special issue, which deal with the fundamental understanding of the issues regarding these materials and their technical status and prospects for development.

  6. Technical findings related to Generic Issue 23: Reactor coolant pump seal failure

    International Nuclear Information System (INIS)

    Ruger, C.J.; Luckas, W.J. Jr.

    1989-03-01

    Reactor coolant pumps contain mechanical seals to limit the leakage of pressurized coolant from the reactor coolant system to the containment. These seals have the potential to leak, and a few have degraded and even failed resulting in a small break loss of coolant accident (LOCA). As a result, ''Reactor Coolant Pump Seal Failure,'' Generic Issue 23 was established. This report summarizes the findings of a technical investigation generated as part of the program to resolve this issue. These technical findings address the various fact-finding issue tasks developed for the action plan associated with the generic issue, namely background information on seal failure, evaluation of seal cooling, and mechanical- and maintenance-induced failure mechanisms. 46 refs., 15 figs., 14 tabs

  7. Analysis of concentrating PV-T systems for the commercial/industrial sector. Volume III. Technical issues and design guidance

    Energy Technology Data Exchange (ETDEWEB)

    Schwinkendorf, W.E.

    1984-09-01

    This report provide appropriate guidance for addressing the major technical issues associated with the design and installation of a photovoltaic-thermal (PV-T) system. Nomographs are presented for developing preliminary sizing and costing, and issues associated with specific components and the overall design of the electrical and mechanical system are discussed. SAND82-7157/2 presents a review of current PV-T technology and operating systems and a study of potential PV-T applications. Detailed PV-T system designs for three selected applications and the results of a trade-off study for these applications are presented in SAND82-7157/4. A summary of the major results of this entire study and conclusions concerning PV-T systems and applications is presented in SAND82-7157/1.

  8. The Virtual Orchestra: Technical and Creative Issues

    Science.gov (United States)

    BIANCHI, F. W.; CAMPBELL, R. H.

    2000-04-01

    The interactive multi-channel computer music system known as the Virtual Orchestra has been used several times in professional opera and theater as an alternative to a live pit orchestra. The technical issues associated with this emerging technology, and the logistical problems of implementing it are discussed. In addition, this paper describes the equally important issues regarding the creative impact this will have on the industry. In particular, this paper explores the role of the musician/technologist and suggests that many of the fundamental premises of opera production will change as the industry begins to retool. This would include the way opera is rehearsed and performed, how it is created and disseminated, and how it will adjust to changing demographics.

  9. Investigating Technical and Pedagogical Usability Issues of Collaborative Learning with Wikis

    Science.gov (United States)

    Hadjerrouit, Said

    2012-01-01

    Wikis have been recently promoted as tools that foster collaborative learning. However, there has been little research devoted to the criteria that are suitable to address issues pertinent to collaborative learning. This paper proposes a set of criteria to explore technical and pedagogical usability issues of collaborative learning with wikis. The…

  10. Socio-technical Issues for Ubiquitous Information Society in 2010

    Science.gov (United States)

    Funabashi, Motohisa; Homma, Koichi; Sasaki, Toshiro; Sato, Yoshinori; Kido, Kunihiko; Fukumoto, Takashi; Yano, Koujin

    Impact of the ubiquitous information technology on our society is so significant that directing technological development and preparing institutional apparatus are quite important and urgent. The present paper elaborates, with the efforts by both humanity and engineering disciplines, to find out the socio-technical issues of ubiquitous information society in 2010 by inspecting social implications of emerging technology as well as social expectations. In order to deliberate the issues, scenarios are developed that describes possible life in ubiquitous information society. The derived issues cover integrating information technology and human body, producing smart sharable environment, protecting individual rights, fostering new service business, and forming community.

  11. Progress on resolution of major surety issues

    International Nuclear Information System (INIS)

    Bell, C.R.; Boudreau, J.M.

    1985-01-01

    This paper presents a summary of the major surety issues (safety, environmental protection, sageguards, reliability, quality assurance) that have been identified during Phase I of the SP-100 Program and the progress that has been made in analyzing the most important of these issues in the context of the conceptual design effort. These issues have been identified as inadvertent criticality, toxic material release and dispersion, radiation exposure following end-of-life reentry, potential diversion of special nuclear material, failure to achieve end-of-life neutronic shutdown, and structural predictability for end-of-life re-entry or boost. Because of the complexity of these issues, a simplified conservative approach was taken during Phase I. Progress on these issues has been mainly in the area of increased understanding of the issues, identification of design features to resolve the issues, and quantitative evaluations of the surety characteristics of the various design concepts

  12. Assessment of major technical hazards in the insurance business

    International Nuclear Information System (INIS)

    Huppmann, H.

    1981-01-01

    Major technical hazards are covered by means of demand premium rates and subjective corrections according to the degree of innovation and different environmental impacts. The insurer compensates remaining risks by compensatory payments or he moderates them at least in their effects. (DG) [de

  13. Power system technical performance issues related to the application of long HVAC cables

    DEFF Research Database (Denmark)

    Wiechowski, on behalf of Cigre WG C4.502, W.; Sluis, L. V. der; Ohno, Teruo

    2011-01-01

    This paper reports the progress of work of Cigre Working Group C4.502 “Power system technical performance issues related to the application of long HVAC cables”. The primary goal of the WG C4.502 is to write a technical brochure that will serve as practical guide for performing studies necessary...... for assessing the technical performance of HV/EHV systems with large share of AC cable lines. This paper besides providing a background for formulation of WG C4.502 and its overall aim, describes the tasks that were accomplished before the interim report was submitted to Study Committee C4 System Technical...... Performance in August 2010. The work in the WG is ongoing and final report will be ready according to the time schedule in 2012. The focus of this paper is in particular to show all issues related to system technical performance with assigned weights in terms of their importance and/or uniqueness for cable...

  14. On technical security issues in cloud computing

    DEFF Research Database (Denmark)

    Jensen, Meiko; Schwenk, Jörg; Gruschka, Nils

    2009-01-01

    , however, there are still some challenges to be solved. Amongst these are security and trust issues, since the user's data has to be released to the Cloud and thus leaves the protection sphere of the data owner. Most of the discussions on this topics are mainly driven by arguments related to organisational......The Cloud Computing concept offers dynamically scalable resources provisioned as a service over the Internet. Economic benefits are the main driver for the Cloud, since it promises the reduction of capital expenditure (CapEx) and operational expenditure (OpEx). In order for this to become reality...... means. This paper focusses on technical security issues arising from the usage of Cloud services and especially by the underlying technologies used to build these cross-domain Internet-connected collaborations....

  15. Major issues associated with DOE commercial recycling initiatives

    International Nuclear Information System (INIS)

    Motl, G.P.; Burns, D.D.; Rast, D.M.

    1994-01-01

    Major initiatives are underway within DOE to recycle large volumes of scrap material generated during cleanup of the DOE Weapons Complex. These recycling initiatives are driven not only by the desire to conserve natural resources, but also by the recognition that shallow level burial is not a politically acceptable option. The Fernald facility is in the vanguard of a number of major DOE recycling efforts. These early efforts have brought issues to light that can have a major impact on the ability of Fernald and other major DOE sites to expand recycling efforts in the future. Some of these issues are; secondary waste deposition, title to material and radioactive contaminants, mixed waste generated during recycling, special nuclear material possession limits, cost benefit, transportation of waste to processing facilities, release criteria, and uses for beneficially reused products

  16. The cloud security ecosystem technical, legal, business and management issues

    CERN Document Server

    Ko, Ryan

    2015-01-01

    Drawing upon the expertise of world-renowned researchers and experts, The Cloud Security Ecosystem comprehensively discusses a range of cloud security topics from multi-disciplinary and international perspectives, aligning technical security implementations with the most recent developments in business, legal, and international environments. The book holistically discusses key research and policy advances in cloud security - putting technical and management issues together with an in-depth treaties on a multi-disciplinary and international subject. The book features contributions from key tho

  17. Magnetic fusion energy plasma interactive and high heat flux components. Volume II. Technical assessment of the critical issues and problem areas in high heat flux materials and component development

    International Nuclear Information System (INIS)

    Abdou, M.A.; Boyd, R.D.; Easor, J.R.

    1984-06-01

    A technical assessment of the critical issues and problem areas for high heat flux materials and components (HHFMC) in magnetic fusion devices shows these problems to be of critical importance for the successful operation of near-term fusion experiments and for the feasibility and attractiveness of long-term fusion reactors. A number of subgroups were formed to assess the critical HHFMC issues along the following major lines: (1) source conditions, (2) systems integration, (3) materials and processes, (4) thermal hydraulics, (5) thermomechanical response, (6) electromagnetic response, (7) instrumentation and control, and (8) test facilities. The details of the technical assessment are presented in eight chapters. The primary technical issues and needs for each area are highlighted

  18. Magnetic fusion energy plasma interactive and high heat flux components. Volume II. Technical assessment of the critical issues and problem areas in high heat flux materials and component development

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.A.; Boyd, R.D.; Easor, J.R.; Gauster, W.B.; Gordon, J.D.; Mattas, R.F.; Morgan, G.D.; Ulrickson, M.A,; Watson, R.D.; Wolfer, W.G,

    1984-06-01

    A technical assessment of the critical issues and problem areas for high heat flux materials and components (HHFMC) in magnetic fusion devices shows these problems to be of critical importance for the successful operation of near-term fusion experiments and for the feasibility and attractiveness of long-term fusion reactors. A number of subgroups were formed to assess the critical HHFMC issues along the following major lines: (1) source conditions, (2) systems integration, (3) materials and processes, (4) thermal hydraulics, (5) thermomechanical response, (6) electromagnetic response, (7) instrumentation and control, and (8) test facilities. The details of the technical assessment are presented in eight chapters. The primary technical issues and needs for each area are highlighted.

  19. Suggested technical scheme to help resolve regulatory issues

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures.

  20. Suggested technical scheme to help resolve regulatory issues

    International Nuclear Information System (INIS)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures

  1. Technical issues in fusion reactors

    International Nuclear Information System (INIS)

    Rohatgi, V.K.; Vijayan, T.

    1989-01-01

    In this paper the issues in fusion reactor technology are examined. Rapid progress in fusion technology research in recent years can be attributed to the advances in various technologies. The commercial generation of fusion power greatly depends on the evolution and improvements in these technologies. With better understanding of plasma physics, fusion reactor designs are becoming more and more realistic and comprehensive. It is now possible to compare various concepts within the framework of established technologies. The technological issues needing better understanding and solutions to problem areas are identified. Various instabilities and energy losses are major problem areas. Extensive developments in reactor-relevant advanced materials, compact and powerful superconducting magnets, high-power systems, and plasma heating drivers need to be undertaken and emphasized

  2. Hanford tank clean up: A guide to understanding the technical issues

    International Nuclear Information System (INIS)

    Gephart, R.E.; Lundgren, R.E.

    1995-01-01

    One of the most difficult technical challenges in cleaning up the US Department of Energy's (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site's 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation's best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford's tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use

  3. Hanford tank clean up: A guide to understanding the technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Gephart, R.E.; Lundgren, R.E.

    1995-12-31

    One of the most difficult technical challenges in cleaning up the US Department of Energy`s (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site`s 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation`s best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford`s tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use.

  4. Containment-emergency-sump performance. Technical findings related to Unresolved Safety Issue A-43

    International Nuclear Information System (INIS)

    1983-04-01

    This report summarizes key technical findings related to the Unresolved Safety Issue A-43, Containment Emergency Sump Performance, and provides recommendations for resolution of attendant safety issues. The key safety questions relate to: (a) effects of insulation debris on sump performance; (b) sump hydraulic performance as determined by design features, submergence, and plant induced effects, and (c) recirculation pump performance wherein air and/or particulate ingestion can occur. The technical findings presented in this report provide information relevant to the design and performance evaluation of the containment emergency sump

  5. Integrating stakeholders' issues and concerns into Nirex's technical research

    International Nuclear Information System (INIS)

    Atherton, Elisabeth

    2004-01-01

    This note outlines some of the activities that Nirex has undertaken to try and integrate stakeholders' issues and concerns into the technical research we have undertaken and how we are attempting to address their issues. Nirex arranges a range of dialogue activities including workshops, meetings, interviews and focus groups with a wide range of stakeholders. These events are coordinated under what is called the Nirex Involvement Programme. The feedback and inputs we have received at these events have been used to influence the work that we undertake. Nirex's interactions with stakeholders, particularly members of the public and local councillors in the aftermath of losing the 1997 rock characterisation facility public inquiry at Sellafield, has been fundamental to changing our whole approach. We are now trying to understand people's issues and recognising that Nirex is accountable to a wide constituency of stakeholders, but particularly the general public and their elected representatives. It has also enabled Nirex to attempt to integrate people's issues and concerns into its work programmes. Specific examples of where stakeholders' issues have impacted on the technical work Nirex undertakes are outlined. (author)

  6. Overview of technical Issues Associated with the Long Term Storage of Light Water Reactor used Nuclear Fuel

    International Nuclear Information System (INIS)

    Sorenson, Ken B.

    2014-01-01

    The nuclear power technical community is developing the technical basis for demonstrating the safety of storing used nuclear fuel for extended periods of time. The combination of reactor operations that off-load spent fuel to interim storage, coupled with delays in repository construction, has resulted in the expectation that storage periods may be for longer periods of time than originally intended. As more fuel continues to be off-loaded from operating reactors, the need for expanded interim storage also increases. As repository programs are delayed, interim storage requirements will likely exceed licensing term limits. To address these operational realities, there has been a concerted international effort to identify and prioritize the technical issues that need to be addressed in order to demonstrate the safety of storing used nuclear fuel for extended periods of time. Since this is an international effort, different storage systems, regulations, and policies need to be considered. This results in differences in technical issues, as well as differences in priorities. However, this effort also identifies important commonalities in some technical areas that need to be addressed. A broad-based international evaluation of these technical issues provides a better understanding of technical concerns as they relate to individual storage systems and specific national regulatory frameworks. While there are several international activities underway that are focused on long term storage, this paper will discuss the activities of the Electric Power Research Institute (EPRI)/Extended Storage Collaboration Program (ESCP) International Subcommittee. A status report detailing the identification and prioritization of the technical issues was presented at the PSAM11 Conference in June 2012 (1). Since that conference, a final report has been completed by the EPRI/ESCP International Subcommittee (2). This paper will provide important results of the final report as well as

  7. Magnetic fusion energy plasma interactive and high heat flux components. Volume I. Technical assessment of the critical issues and problem areas in the plasma materials interaction field

    International Nuclear Information System (INIS)

    Conn, R.W.; Gauster, W.B.; Heifetz, D.; Marmar, E.; Wilson, K.L.

    1984-01-01

    A technical assessment of the critical issues and problem areas in the field of plasma materials interactions (PMI) in magnetic fusion devices shows these problems to be central for near-term experiments, for intermediate-range reactor devices including D-T burning physics experiments, and for long-term reactor machines. Critical technical issues are ones central to understanding and successful operation of existing and near-term experiments/reactors or devices of great importance for the long run, i.e., ones which will require an extensive, long-term development effort and thus should receive attention now. Four subgroups were formed to assess the critical PMI issues along four major lines: (1) PMI and plasma confinement physics experiments; (2) plasma-edge modelling and theory; (3) surface physics; and (4) materials technology for in-vessel components and the first wall. The report which follows is divided into four major sections, one for each of these topics

  8. Strategic issues for the oil majors - 1992

    Energy Technology Data Exchange (ETDEWEB)

    Oppenheimer, P M [Oxford Univ. (United Kingdom)

    1992-01-01

    Strategic issues facing major oil producers in the 1990s are very diffuse - in contrast with both the 1970s (when strategy meant the response to high oil prices) and the 1980s (when it meant anticipating and exploiting a drop in prices). Mainly upstream issues include the future of price management by OPEC or a successor, the speed of development of new markets for natural gas in power generation and the role of Russia in world energy markets. Other issues include the impact of environmental regulations and taxes on the product mix and on marketing. Human-resource management will continue to face the task of reconciling career opportunities with static or declining manpower requirements; and corporate cash mountains may periodically recur. (Author).

  9. Strategic issues for the oil majors - 1992

    International Nuclear Information System (INIS)

    Oppenheimer, P.M.

    1992-01-01

    Strategic issues facing major oil producers in the 1990s are very diffuse - in contrast with both the 1970s (when strategy meant the response to high oil prices) and the 1980s (when it meant anticipating and exploiting a drop in prices). Mainly upstream issues include the future of price management by OPEC or a successor, the speed of development of new markets for natural gas in power generation and the role of Russia in world energy markets. Other issues include the impact of environmental regulations and taxes on the product mix and on marketing. Human-resource management will continue to face the task of reconciling career opportunities with static or declining manpower requirements; and corporate cash mountains may periodically recur. (Author)

  10. Nuclear Energy Center Site Survey, 1975. Part III. Technical considerations

    International Nuclear Information System (INIS)

    1976-01-01

    Studies of the technical feasibility of nuclear energy centers (NECs) and the comparison between NEC technical feasibility and that of nuclear facilities on dispersed sites are reviewed. The conclusions related to technical feasibility of NEC are summarized. Technical feasibility was found to rest mainly on five major issues: heat dissipation, transmission, facility construction, radiological impact, and environmental impact. Although general conclusions can be reached in these five areas, it is recognized that they are interdependent, and detailed site-by-site analysis will be necessary. Some general conclusions on technical feasibility of NECs are presented, then detailed conclusions derived from the technical evaluation of NECs compared to dispersed site facilities are presented. The findings of this study on each of the five major feasibility issues are then discussed in sequence. The study concludes that nuclear energy centers, as defined herein, are technically feasible

  11. Technical issues in the geologic disposal of radioactive wastes

    International Nuclear Information System (INIS)

    Weart, W.D.

    1980-01-01

    The status of technical understanding regarding radioactive waste repositories in geologic media is improving at a rapid rate. Within a few years the knowledge regarding non-salt repositories will be on a par with that which now exists for salt. To date there is no technical reason to doubt that geologic repositories in several different geologic media can be safely implemented to provide long-term isolation of radioactive wastes. Indeed, for bedded salt, there is now sufficient knowledge to allow all the identified phenomena to be bounded with satisfactory resultant consequences. It is possible to now proceed with technical confidence in an orderly development of a bedded-salt repository at a satisfactory site. This development would call for in-situ experiments, at the earliest possible stage, to confirm or validate the predictions made for the site. These in-situ experiments will be necessary for each repository in a different rock type. If, for non-technical reasons, repository development is delayed, field test facilities should be located as soon as possible in geologic settings typical of proposed repositories. Extensive testing to resolve generic issues will allow subsequent development of repositories to proceed more rapidly with only minimal in-situ testing required to resolve site-specific concerns

  12. Nuclear energy in Texas: major issues and policy recommendations

    International Nuclear Information System (INIS)

    1979-01-01

    On December 15, 1978 the Texas Energy Advisory Council (TEAC) adopted the Texas Energy Policy, 1978 Update. The Council recognized the great complexity of technical, economic, social, and political issues which have an impact on nuclear power, and therefore decided that a special committee was needed to examine in greater detail the nuclear energy issues facing Texas. This report summarizes the work of the Advisory Committee on Nuclear energy. Topics discussed include: biological affects of low levels of radiation; transportation of radioactive material in Texas; uranium mining and milling; severance tax on uranium mining; alternate reactor designs and fuel cycles; financing nuclear plant construction; cost of disposing of nuclear wastes and decommissioning nuclear plants; low-level wastes; disposal of high-level wastes; commercial spent nuclear fuel reprocessing; and transmutation of radioactive wastes

  13. An analysis of the major challenges and obstacles for international technical cooperation in health, Brazil-Mozambique.

    Science.gov (United States)

    Pereira, Eduardo Mazzaroppi Barao

    2017-07-01

    Health has become a priority issue on the agenda in relation to Brazilian international technical cooperation in the last decade. This applies to Mozambique which is a strategic partner of Brazil's when one takes into consideration the volume of projects that have been undertaken between the two countries and the available resources on offer. There has been a shift in the foreign policy paradigm which has resulted in a new Brazilian foreign policy posture that promotes bilateral agreements and international cooperation. On conducting a retrospective and current analysis it is clear that there are, however, major obstacles and challenges for bilateral agreements and technical international cooperation that require in-depth study and which need to be dealt with in the area of health. This paper seeks to identify and analyze these obstacles with a view to providing proposals for ways forward. It takes the approach of using the methodology of reviewing specialized journals on this topic as well as using qualitative research from the main actors and institutions involved in bilateral cooperation.

  14. Non-technical issues in safety assessments for nuclear disposal facilities

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Brohmann, Bettina

    2010-09-01

    The paper highlights that a comprehensive approach to safety affords the consideration of technology, organisation, personnel and social environment. In several safety relevant contexts of nuclear waste disposal these fields are closely interrelated. The approach for the consideration of socio-scientific aspects which is sketched in this paper supports the systematic treatment of safety relevant non-technical issues in the safety case or in safety assessments for a disposal project. Furthermore it may foster the dialogue among specialists from the technical, the natural- and the socio-scientific field on questions of disposal safety. In this way it may contribute to a better understanding among the affected scientific disciplines in nuclear waste disposal.

  15. Research on Evaluation Methodology for High Temperature Components and Technical Issues

    International Nuclear Information System (INIS)

    Kim, Y.J.; Han, S.B.

    2007-03-01

    The research on evaluation methodology for high temperature components and technical issues includes the comparison of evaluation technology of Very High Temperature Reactors(VHTRs) with that of present commercial reactors, the review of Hot Gas Duct(HGD) insulation designs, the analysis of the codes related to VHTR component construction and the analysis of technical issues on application of present codes to HGD construction. Codes to assure the integrity of the VHTR components are not fully prepared yet in any country. To understand the evaluation technology of the VHTR-related codes, key requirements of ASME B and PV Code Section III, Subsection NB and NH were compared. Six kinds of HGD designs were reviewed and compared. A reference which analyzed seven kinds of present component codes were reviewed and the limitations of them were summarized. Especially it was found that the selection of materials is limited, material property data are not enough, and design analysis methodology is not fully specified

  16. Fitness for duty in the nuclear industry: Update of the technical issues 1996

    International Nuclear Information System (INIS)

    Durbin, N.; Grant, T.

    1996-05-01

    The purpose of this report is to provide an update of information on the technical issues surrounding the creation, implementation, and maintenance of fitness-for-duty (FFD) policies and programs. It has been prepared as a resource for Nuclear Regulatory Commission (NRC) and nuclear power plant personnel who deal with FFD programs. It contains a general overview and update on the technical issues that the NRC considered prior to the publication of its original FFD rule and the revisions to that rule (presented in earlier NUREG/CRs). It also includes chapters that address issues about which there is growing concern and/or about which there have been substantial changes since NUREG/CR-5784 was published. Although this report is intended to support the NRC's rule making on fitness for duty, the conclusions of the authors of this report are their own and do not necessarily represent the opinions of the NRC

  17. Briefing Products - Tools for Communicating Technical Issues to a Non-Technical Audience

    International Nuclear Information System (INIS)

    Clark, Harvey; Foster, Kevin T.

    2011-01-01

    Briefing Products are a new NARAC/IMAAC product line designed to communicate the consequences of a radiological, nuclear, chemical or biological agent incident to non-technical decision makers and key leaders. Each Briefing Product addresses a single decision or issue focused on potential actions that should be considered when responding to a hazard, while avoiding the use of technical or regulatory jargon. Briefing Products do not make protective action recommendations, although they do concretely assist decision-makers with development of their own protective actions by quoting or paraphrasing the published guidance relevant to the decision at hand. Briefing Products are produced in sets tailored to specific types of incident which together depict the key decisions and characteristics of the incident. Each Briefing Product in the set consists of three elements: (1) Primary Effects, (2) Key Points and (3) Presenter Notes. Both the Primary Effects and Key Points are ready for direct presentation, while the Presenter Notes are designed to provide background information to the presenter and are not for direct presentation to the audience. The Briefing Products themselves are alternative presentations of results from the customary standard NARAC/IMAAC technical products. Currently, Briefing Products are available for detonation of both RDDs (Radiological Dispersal Devices) and INDs (Improvised Nuclear Devices). A new set of products tailored to nuclear power plant (NPP) accidents is currently under development. This paper describes the scope, structure and content of the Briefing Product sets. Examples from the two sets of Briefing Products now available are presented.

  18. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  19. Key technical issues associated with a method of pulse compression. Final technical report

    International Nuclear Information System (INIS)

    Hunter, R.O. Jr.

    1980-06-01

    Key technical issues for angular multiplexing as a method of pulse compression in a 100 KJ KrF laser have been studied. Environmental issues studied include seismic vibrations man-made vibrations, air propagation, turbulence, and thermal gradient-induced density fluctuations. These studies have been incorporated in the design of mirror mounts and an alignment system, both of which are reported. A design study and performance analysis of the final amplifier have been undertaken. The pulse compression optical train has been designed and assessed as to its performance. Individual components are described and analytical relationships between the optical component size, surface quality, damage threshold and final focus properties are derived. The optical train primary aberrations are obtained and a method for aberration minimization is presented. Cost algorithms for the mirrors, mounts, and electrical hardware are integrated into a cost model to determine system costs as a function of pulse length, aperture size, and spot size

  20. Fitness for duty in the nuclear industry: Update of the technical issues 1996

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, N.; Grant, T. [eds.] [Battelle Seattle Research Center, WA (United States)

    1996-05-01

    The purpose of this report is to provide an update of information on the technical issues surrounding the creation, implementation, and maintenance of fitness-for-duty (FFD) policies and programs. It has been prepared as a resource for Nuclear Regulatory Commission (NRC) and nuclear power plant personnel who deal with FFD programs. It contains a general overview and update on the technical issues that the NRC considered prior to the publication of its original FFD rule and the revisions to that rule (presented in earlier NUREG/CRs). It also includes chapters that address issues about which there is growing concern and/or about which there have been substantial changes since NUREG/CR-5784 was published. Although this report is intended to support the NRC`s rule making on fitness for duty, the conclusions of the authors of this report are their own and do not necessarily represent the opinions of the NRC.

  1. Key issues and technical route of cyber physical distribution system

    Science.gov (United States)

    Zheng, P. X.; Chen, B.; Zheng, L. J.; Zhang, G. L.; Fan, Y. L.; Pei, T.

    2017-01-01

    Relying on the National High Technology Research and Development Program, this paper introduced the key issues in Cyber Physical Distribution System (CPDS), mainly includes: composite modelling method and interaction mechanism, system planning method, security defence technology, distributed control theory. Then on this basis, the corresponding technical route is proposed, and a more detailed research framework along with main schemes to be adopted is also presented.

  2. Critical technical issues and evaluation and comparison studies for inertial fusion energy reactors

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.A. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Ying, A.Y. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Tillack, M.S. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Ghoniem, N.M. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Waganer, L.M. (McDonnell Douglas Aerospace, St. Louis, MI (United States)); Driemeyer, D.E. (McDonnell Douglas Aerospace, St. Louis, MI (United States)); Linford, G.J. (TRW Space and Electronics Div., Redondo Beach, CA (United States)); Drake, D.J.

    1994-01-01

    Two inertial fusion energy (IFE) reactor design concepts developed in the Prometheus studies were evaluated. Objectives were to identify and characterize critical issues and the R and D required to resolve them, and to establish a sound basis for future IFE technical and programmatic decisions. Each critical issue contains several key physics and engineering issues associated with major reactor components and impacts key aspects of feasibility, safety, and economic potential of IFE reactors. Generic critical issues center around: demonstration of moderate gain at low driver energy, feasibility of direct drive targets, feasibility of indirect drive targets for heavy ions, feasibility of indirect drive targets for lasers, cost reduction strategies for heavy ion drivers, demonstration of higher overall laser driver efficiency, tritium self-sufficiency in IFE reactors, cavity clearing at IFE pulse repetition rates, performance/reliability/lifetime of final laser optics, viability of liquid metal film for first wall protection, fabricability/reliability/lifetime of SiC composite structures, validation of radiation shielding requirements, design tools, and nuclear data, reliability and lifetime of laser and heavy ion drivers, demonstration of large-scale non-linear optical laser driver architecture, demonstration of cost effective KrF amplifiers, and demonstration of low cost, high volume target production techniques. Quantitative evaluation and comparison of the two design options have been made with special focus on physics feasibility, engineering feasibility, economics, safety and environment, and research and development (R and D) requirements. Two key conclusions are made based on the overall evaluation analysis. The heavy-ion driven reactors appear to have an overall advantage over laser-driven reactors.

  3. Gender Issues in Technical Communication Studies: An Overview of the Implications for the Profession, Research, and Pedagogy.

    Science.gov (United States)

    Allen, Jo

    1991-01-01

    Presents an overview of research and unanswered questions related to gender issues in technical communication. Addresses the consequences of the feminization of technical communication, research on gender differences in technical communication, and the means for encouraging a more gender-balanced view of business and industry. (SR)

  4. Investigating Some Technical Issues on Cohesive Zone Modeling of Fracture

    Science.gov (United States)

    Wang, John T.

    2011-01-01

    This study investigates some technical issues related to the use of cohesive zone models (CZMs) in modeling fracture processes. These issues include: why cohesive laws of different shapes can produce similar fracture predictions; under what conditions CZM predictions have a high degree of agreement with linear elastic fracture mechanics (LEFM) analysis results; when the shape of cohesive laws becomes important in the fracture predictions; and why the opening profile along the cohesive zone length needs to be accurately predicted. Two cohesive models were used in this study to address these technical issues. They are the linear softening cohesive model and the Dugdale perfectly plastic cohesive model. Each cohesive model constitutes five cohesive laws of different maximum tractions. All cohesive laws have the same cohesive work rate (CWR) which is defined by the area under the traction-separation curve. The effects of the maximum traction on the cohesive zone length and the critical remote applied stress are investigated for both models. For a CZM to predict a fracture load similar to that obtained by an LEFM analysis, the cohesive zone length needs to be much smaller than the crack length, which reflects the small scale yielding condition requirement for LEFM analysis to be valid. For large-scale cohesive zone cases, the predicted critical remote applied stresses depend on the shape of cohesive models used and can significantly deviate from LEFM results. Furthermore, this study also reveals the importance of accurately predicting the cohesive zone profile in determining the critical remote applied load.

  5. Identification of technical problems encountered in the shallow land burial of low-level radioactive wastes

    International Nuclear Information System (INIS)

    Jacobs, D.G.; Epler, J.S.; Rose, R.R.

    1980-03-01

    A review of problems encountered in the shallow land burial of low-level radioactive wastes has been made in support of the technical aspects of the National Low-Level Waste (LLW) Management Research and Development Program being administered by the Low-Level Waste Management Program Office, Oak Ridge National Laboratory. The operating histories of burial sites at six major DOE and five commercial facilities in the US have been examined and several major problems identified. The problems experienced st the sites have been grouped into general categories dealing with site development, waste characterization, operation, and performance evaluation. Based on this grouping of the problem, a number of major technical issues have been identified which should be incorporated into program plans for further research and development. For each technical issue a discussion is presented relating the issue to a particular problem, identifying some recent or current related research, and suggesting further work necessary for resolving the issue. Major technical issues which have been identified include the need for improved water management, further understanding of the effect of chemical and physical parameters on radionuclide migration, more comprehensive waste records, improved programs for performance monitoring and evaluation, development of better predictive capabilities, evaluation of space utilization, and improved management control

  6. Identification of technical problems encountered in the shallow land burial of low-level radioactive wastes

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D.G.; Epler, J.S.; Rose, R.R.

    1980-03-01

    A review of problems encountered in the shallow land burial of low-level radioactive wastes has been made in support of the technical aspects of the National Low-Level Waste (LLW) Management Research and Development Program being administered by the Low-Level Waste Management Program Office, Oak Ridge National Laboratory. The operating histories of burial sites at six major DOE and five commercial facilities in the US have been examined and several major problems identified. The problems experienced st the sites have been grouped into general categories dealing with site development, waste characterization, operation, and performance evaluation. Based on this grouping of the problem, a number of major technical issues have been identified which should be incorporated into program plans for further research and development. For each technical issue a discussion is presented relating the issue to a particular problem, identifying some recent or current related research, and suggesting further work necessary for resolving the issue. Major technical issues which have been identified include the need for improved water management, further understanding of the effect of chemical and physical parameters on radionuclide migration, more comprehensive waste records, improved programs for performance monitoring and evaluation, development of better predictive capabilities, evaluation of space utilization, and improved management control.

  7. Non-technical Issues in Design and Development of Personal Portable Devices.

    Science.gov (United States)

    Lhotska, Lenka; Cheshire, Paul; Pharow, Peter; Macku, David

    2016-01-01

    Mobile technologies are constantly evolving and with the development of Internet of Things we can expect continuous increase of various applications. Mobile technologies have undeniable opportunities to play an important role in health services. Concerning purely technical aspects, almost every problem can be solved. However, there are still many unsolved and unclear issues related with ethics and governance mechanisms for mobile phone applications. These issues are even more critical in medical and health care applications of mobile technologies. This paper tries to analyse ethical, and privacy-related challenges that may occur when introducing Personal Portable Devices (PPD) to collect and record personal health data in health care and welfare environment.

  8. Dryland ecohydrology and climate change: critical issues and technical advances

    Directory of Open Access Journals (Sweden)

    L. Wang

    2012-08-01

    Full Text Available Drylands cover about 40% of the terrestrial land surface and account for approximately 40% of global net primary productivity. Water is fundamental to the biophysical processes that sustain ecosystem function and food production, particularly in drylands where a tight coupling exists between ecosystem productivity, surface energy balance, biogeochemical cycles, and water resource availability. Currently, drylands support at least 2 billion people and comprise both natural and managed ecosystems. In this synthesis, we identify some current critical issues in the understanding of dryland systems and discuss how arid and semiarid environments are responding to the changes in climate and land use. The issues range from societal aspects such as rapid population growth, the resulting food and water security, and development issues, to natural aspects such as ecohydrological consequences of bush encroachment and the causes of desertification. To improve current understanding and inform upon the needed research efforts to address these critical issues, we identify some recent technical advances in terms of monitoring dryland water dynamics, water budget and vegetation water use, with a focus on the use of stable isotopes and remote sensing. These technological advances provide new tools that assist in addressing critical issues in dryland ecohydrology under climate change.

  9. Technical requirement of experiments and facilities for fusion nuclear technology

    International Nuclear Information System (INIS)

    Abdou, M.; Tillak, M.; Gierszwski, P.; Grover, J.; Puigh, R.; Sze, D.K.; Berwald, D.

    1986-06-01

    The technical issues and requirements of experiments and facilities for fusion nuclear technology (FNT) have been investigated. The nuclear subsystems addressed are: a) blanket, b) radiation shield, c) tritium processing system, and d) plasma interactive components. Emphasis has been placed on the important and complex development problems of the blanket. A technical planning process for FNT has been developed and applied, including four major elements: 1) characterization of issues, 2) quantification of testing requirements, 3) evaluation of facilities, and 4) development of a test plan to identify the role, timing, characteristics and costs of major experiments and facilities

  10. 75 FR 68780 - Reliability Monitoring, Enforcement and Compliance Issues; Agenda for the Technical Conference

    Science.gov (United States)

    2010-11-09

    ... Commissioner-led Technical Conference on November 18, 2010 in the above-referenced proceeding to explore issues...://www.ferc.gov . Anyone with Internet access who desires to listen to this event can do so by navigating...

  11. KBS Annual Report 1982. Summaries of technical reports issued during 1982

    International Nuclear Information System (INIS)

    1983-07-01

    The purpose of the KBS Annual Report is to inform interested organizations and individuals of the research and development work perfomed by the division KBS within the Swedish Nuclear Fuel Supply Co. (SKBF) on the handling, treatment and final storage of nuclear wastes in Sweden. In the Annual Report for 1982 the summaries of 27 technical reports and other publications issued during the year are listed. (K.A.E.)

  12. Some challenges and issues in managing, and preserving access to, long-lived collections of digital scientific and technical data

    Directory of Open Access Journals (Sweden)

    W L Anderson

    2006-01-01

    Full Text Available One goal of the Committee on Data for Science and Technology is to solicit information about, promote discussion of, and support action on the many issues related to scientific and technical data preservation, archiving, and access. This brief paper describes four broad categories of issues that help to organize discussion, learning, and action regarding the work needed to support the long-term preservation of, and access to, scientific and technical data. In each category, some specific issues and areas of concern are described.

  13. Agricultural Ethics, Environmental Ethics, and Bioethics : the Major Issues of Agricultural Ethics

    OpenAIRE

    畠中, 和生

    2002-01-01

    It is the aim of the paper is to make the major issues of agricultural ethics clear by comparing them with the ones of environmental ethics and bioethics. The main topics in this paper are following. 1. The major issues of the debate over agricultural ethics are (1) agricultural threats to public health and safety; (2) government responsibility for controlling agricultural resource depletion; (3) agricultural contributions to ecological disturbance; (4) government responsibility for preservin...

  14. Technical issues of fabrication technologies of reduced activation ferritic/martensitic steels

    International Nuclear Information System (INIS)

    Tanigawa, Hiroyasu; Sakasegawa, Hideo; Hirose, Takanori

    2013-01-01

    Highlights: • The key technical issues of RAFM steel fabrication are the control of Ta, and deoxidation of the steel with a limited amount of Al addition. • Addition of Ta with poor deoxidation might results in the agglomeration of inclusions at 1/2t position. • ESR was proved to be effective removing Ta oxide inclusions and avoiding agglomeration of inclusions at 1/2t position, and achieving low oxygen concentration. -- Abstract: The key issue for DEMO application is that Reduced activation ferritic/martensitic (RAFM) steels fabrication technologies has to be highly assured, especially with respect to high availability, reliability and reduced activation capability on the DEMO level fabrication, which requires not a few tons but thousand tons RAFM fabrication. One of the key technical issues of RAFM fabrication is the control of Ta, and deoxidation of the steel with a limited amount of Al addition. The series of F82H (Fe–8Cr–2W–V, Ta) melting revealed that Ta have tendency to form oxide on melting process, and this will have large impact on reliability of the steels. Al is also the key elements, as it is commonly used for deoxidation of steels, and achieving lower oxygen level is essential to obtain good mechanical properties, but the maximum concentration of Al is limited in view of reduced activation capability. These tendency and limitation resulted in the Ta oxide agglomeration in the middle of plate, but the remelting process, ESR (electro slag remelting), was found to be successful on removing those Ta oxides

  15. Facilitating Site Specific and Citizens Advisory Boards: Running Effective Meetings that Involve Complex Technical Issues

    International Nuclear Information System (INIS)

    Freeman, J.

    2009-01-01

    Environmental cleanup issues at federal sites are more often than not on the agendas of meetings of the Site Specific Advisory Boards (SSABs), also called Citizens Advisory Boards (CABs), that exist at most U.S. Department of Energy (DOE) sites with an Environmental Management (EM) mission. In 1994, when Congress established these committees comprised of local citizens, it enabled community stakeholders to become more directly involved in DOE EM cleanup decisions. This involvement is to help the agency make cost-effective and environmentally sound decisions which lead to faster, safer cleanups. Eight local Boards that fall under the Federal Advisory Committee Act-chartered EM SSAB charter are found in Hanford, Washington; Idaho; Northern New Mexico; Nevada; Oak Ridge, Tennessee; Paducah, Kentucky; Portsmouth, Ohio; and at the Savannah River Site in South Carolina. These boards provide advice and recommendations about EM site-specific issues such as cleanup standards (how clean is clean?), environmental restoration, waste management, the stabilization and disposal of non-stockpile nuclear materials, future land use and long-term stewardship, risk assessment and management, and cleanup science and technology activities. These issues are, by their very nature, loaded with complicated technical terms and strategies, scientific data and interpretations, and long histories of studies and reports. The members of SSABs and CABs rotate on and off the Boards according to defined terms of office, thereby routinely opening the Boards' ranks to new members, many of whom are new to the issues. In addition, members of the public who have access to public comment periods at each Board meeting run up against the same daunting menu of obscure acronyms, scientific terms and notations, and an historical trail which is not always evident except to those involved with the issues over many years. How does a facilitator effectively guide such a group of citizens, each of whom arrives to

  16. Technical issues of electric nanopulse contact lithotripsy as factors affecting lithotripsy effectiveness and probe resourses

    Directory of Open Access Journals (Sweden)

    L. Yu. Ivanova

    2012-01-01

    Full Text Available To assess the relationship of main technical issues of electric nanopulse contact lithotripsy (CLT with lithotripsy effectiveness and lithotripsy resources of probe.Electric nanopulses were transmitted by the flexible probes and the lithotripter «Urolit». The relationship between lithotripsy effectiveness and tip diameter of probes, pulse energy, pulse frequency was assessed, and resources of lithotripsy probes with different diameters of the tip were analyzed.Sufficient number of electric nanopulse to destroy stone models was less when tip diameter, nanopulse energy and frequency were greater.Effectiveness of electric nanopulse CLT can be enhanced with the increase of nanopulse energy, frequency and probe diameter. Complex correction of technical issues of electric nanopulse CLT can be a way of probe resources saving.

  17. Socio-technical issues and challenges in implementing safe patient handovers: insights from ethnographic case studies.

    Science.gov (United States)

    Balka, Ellen; Tolar, Marianne; Coates, Shannon; Whitehouse, Sandra

    2013-12-01

    Ineffective handovers in patient care, including those where information loss occurs between care providers, have been identified as a risk to patient safety. Computerization of health information is often offered as a solution to improve the quality of care handovers and decrease adverse events related to patient safety. The purpose of this paper is to broaden our understanding of clinical handover as a patient safety issue, and to identify socio-technical issues which may come to bear on the success of computer based handover tools. Three in depth ethnographic case studies were undertaken. Field notes were transcribed and analyzed with the aid of qualitative data analysis software. Within case analysis was performed on each case, and subsequently, cross case analyses were performed. We identified five types of socio-technical issues which must be addressed if electronic handover tools are to succeed. The inter-dependencies of these issues are addressed in relation to arenas in which health care work takes place. We suggest that the contextual nature of information, ethical and medico-legal issues arising in relation to information handover, and issues related to data standards and system interoperability must be addressed if computerized health information systems are to achieve improvements in patient safety related to handovers in care. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  18. Review of technical issues related to the failure of Rosemount pressure transmitters due to fill oil loss. Final report

    International Nuclear Information System (INIS)

    James, R.W.; Gaertner, J.P.; Burns, E.T.; Horn, A.; Lee, L.K.

    1994-08-01

    Rosemount pressure transmitters are extensively used in both safety and non-safety applications in US nuclear power plants. They are used to measure pressure, flow, and water level. Rosemount pressure transmitter models 1151, 1152, 1153A, 1153, and 1154 use a fill oil to hydraulically transmit process pressure exerted on outer isolating diaphragms to internal diaphragms. The resulting deflection of the internal diaphragms changes the distance between them and a central diaphragm separating the transmitter interior into two volumes. The change in distance is measured as a change in electrical capacitance between the isolating diaphragms and the central diaphragm and can be related to differential pressure. The fill oil also functions as a dielectric. It has been well established that this fill oil can potentially leak over time, decreasing transmitter accuracy and increasing transmitter response time. Ultimately, the transmitter can fail. An extensive effort has been expended by the nuclear power industry collectively to analyze this issue and develop technically sound and reasonable requirements to mitigate the effects of oil loss in Rosemount pressure transmitters. Despite this, technical concerns have still been raised regarding the technical validity of the past analyses of this problem and its scope. In May 1993, the NRC created an internal group to comprehensively review the Rosemount issue and the NRC's action in addressing it to ensure that all available technical information has been considered. Because this issue remains of active technical interest and because the past work on this subject has been done by many different groups and organizations, EPRI has prepared this report to thoroughly document the current technical understanding of this issue, to perform additional analysis, and to identify any appropriate additional technical research activities regarding oil loss in Rosemount pressure transmitters

  19. Estimate of Technical Potential for Minimum Efficiency Performance Standards in 13 Major World Economies

    Energy Technology Data Exchange (ETDEWEB)

    Letschert, Virginie [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Desroches, Louis-Benoit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ke, Jing [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McNeil, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-07-01

    As part of the ongoing effort to estimate the foreseeable impacts of aggressive minimum efficiency performance standards (MEPS) programs in the world’s major economies, Lawrence Berkeley National Laboratory (LBNL) has developed a scenario to analyze the technical potential of MEPS in 13 major economies around the world1 . The “best available technology” (BAT) scenario seeks to determine the maximum potential savings that would result from diffusion of the most efficient available technologies in these major economies.

  20. Electronic Scholarly Journals: A Review of Technical Issues in Digital Environment

    Directory of Open Access Journals (Sweden)

    Golnessa Galyani Moghaddam

    2006-12-01

    Full Text Available Scholarly journals are known as the most important medium for scholarly communication since long time back. As technology transforms the flow of information and idea everywhere, it changes the nature of scholarly communications and publishing of scholarly journals as well. The electronic scholarly publishing rapidly produced an expectation, among researchers of the availability of articles at their desktop, rather than the previous scenario of visiting the library to read a print journal issue. There are lots of technological improvements in electronic journals publishing. The present paper looks at some of technical issues in electronic publishing such as DOI, DOI-X, CrossRef, Citation/Reference Linking, OpenURL, SFX and MetaLib which are being used in the World Wide Web.

  1. Major issues on establishing an emergency plan in nuclear facilities

    International Nuclear Information System (INIS)

    Chen, Zhu-zhou

    1988-03-01

    Several major issues on emergency planning and preparation in nuclear facilities were discussed -- such as the importance of emergency planning and preparation, basic principles of intervention and implementation of emergency plan and emergency training and drills to insure the effectiveness of the emergency plan. It is emphasized that the major key point of emergency planning and response is to avoid the occurrence of serious nonrandom effect. 12 refs., 3 tabs

  2. A study on technical issues of materials and design bases in ASME section III subsection NH code

    International Nuclear Information System (INIS)

    Lee, Hyeong Yeon; Kim, Jong Bum; Yoo, Bong

    2000-12-01

    In this study, an analysis of evaluation report by ORNL on the technical issues of elevated temperatures design guide line, ASME Code Section III Subsection NH was conducted and a brief evaluation procedure of the creep-fatigue damage was presented. ORNL published the report in 1993 and reviewed the issue areas where code rules or regulatory guides may be lacking or inadequate to ensure safe operation over the expected life cycles for liquid metal reactor systems. From historical viewpoint of the ASME NH code development, ASME Code Case 47 was changed much in 1989 edition, which includes the stress relaxation behavior in creep damage evaluation. Afterwards the 1992 version of CC N-47 was upgraded to Subsection NH in 1995 edition, which is the same with that of CC N-47 1992 edition except few material data. This report brings up the technical and regulatory issues that can not guarantee the safe and reliable operation of the ALMR which got the conceptual design certification from NRC. Twenty three technical issues were raised and settlement methodology were proposed. Additionally, the status of items approved by ASME code subgroup of elevated temperature design committee for the revision of the most recent 1998 edition of ASME NH was described

  3. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  4. Technical and socio-political issues in radioactive waste disposal 1986. Vol. 1

    International Nuclear Information System (INIS)

    Parker, F.L.; Kasperson, R.E.; Andersson, T.L.; Parker, S.A.

    1987-11-01

    The purpose of the study was to provide an integrated technical and socio-political analysis of how six countries (Federal Republic of Germany, France, Sweden, Switzerland, United Kingdom and the United States of America) have responded to four key issues in radioactive waste management: a) What constitutes 'safe' or 'absolutely safe' disposal, b) site selection processes, c) timing and type of interim storage. (orig./HP)

  5. Technical and Ethical Issues in Indicator Systems

    Directory of Open Access Journals (Sweden)

    Carol Taylor Fitz-Gibbon

    2002-01-01

    Full Text Available Most indicator systems are top-down, published, management systems, addressing primarily the issue of public accountability. In contrast we describe here a university-based suite of "grass-roots," research-oriented indicator systems that are now subscribed to, voluntarily, by about 1 in 3 secondary schools and over 4,000 primary schools in England. The systems are also being used by groups in New Zealand, Australia and Hong Kong, and with international schools in 30 countries. These systems would not have grown had they not been cost-effective for schools. This demanded the technical excellence that makes possible the provision of one hundred percent accurate data in a very timely fashion. An infrastructure of powerful hardware and ever-improving software is needed, along with extensive programming to provide carefully chosen graphical and tabular presentations of data, giving at-a-glance comparative information. Highly skilled staff, always learning new techniques, have been essential, especially as we move into computer-based data collection. It has been important to adopt transparent, readily understood methods of data analysis where we are satisfied that these are accurate, and to model the processes that produce the data. This can mean, for example, modelling separate regression lines for 85 different examination syllabuses for one age group, because any aggregation can be shown to represent unfair comparisons. Ethical issues are surprisingly often lurking in technical decisions. For example, reporting outcomes from a continuous measure in terms of the percent of students who surpassed a certain level, produces unethical behavior: a concentration of teaching on borderline students. Distortion of behavior and data corruption are ever-present concerns in indicator systems. The systems we describe would have probably failed to thrive had they not addressed schools' on-going concerns about education. Moreover, data interpretation can only be

  6. Promoting business with corporate gifts: major issues and empirical evidence

    OpenAIRE

    Fan, Y

    2006-01-01

    Corporate gifts are an important tool in the marketing communication mix. This paper is divided into two parts. It first reviews the literature of corporate gifts and incentives, focusing on major issues in the use of corporate gifts: marketing issues, practical considerations, and ethical and cultural concerns. In the second part, it presents a survey in the UK airline industry. Corporate gifts are found to be used mainly as a means of enhancing corporate image and creating goodwill. They ar...

  7. Independent technical review of Savannah River Site Defense Waste Processing Facility technical issues

    International Nuclear Information System (INIS)

    1992-07-01

    The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) will vitrify high-level radioactive waste that is presently stored as liquid, salt-cake, and sludge in 51 waste-storage tanks. Construction of the DWPF began in 1984, and the Westinghouse Savannah Company (WSRC) considers the plant to be 100% turned over from construction and 91% complete. Cold-chemical runs are scheduled to begin in November 1992, and hot start up is projected for June 1994. It is estimated that the plant lifetime must exceed 15 years to complete the vitrification of the current, high-level tank waste. In a memo to the Assistant Secretary for Defense Programs (DP-1), the Assistant Secretary for Environmental Restoration and Waste management (EM-1) established the need for an Independent Technical Review (ITR), or the Red Team, to ''review process technology issues preventing start up of the DWPF.'' This report documents the findings of an Independent Technical Review (ITR) conducted by the Department of Energy (DOE), Office of Environmental Restoration and Waste Management (EM), at the request of the Assistant Secretary for Environmental Restoration and Waste Management, of specified aspects of Defense Waste Process Facility (DWPF) process technology. Information for the assessment was drawn from documents provided to the ITR Team by the Westinghouse Savannah River Company (WSRC), and presentations, discussions, interviews, and tours held at the Savannah River Site (SRS) during the weeks of February and March 9, 1992

  8. Technical issues and solutions on ITER first wall beryllium application. Industrial viewpoint

    International Nuclear Information System (INIS)

    Iwadachi, T.; Uda, M.; Ito, M.; Miyakawa, M.; Ibuki, M.

    2004-01-01

    Beryllium is selected as reference armor material of ITER primary first wall and is joined to the copper alloy heat sink such as CuCrZr or Dispersion Strengthened Copper (DSCu) Various joining technologies have been successfully developed and the manufacturing possibilities of large size first wall panels with beryllium armor has been demonstrated. Based on such results, further technical improvement is needed to reduce manufacturing cost and ensure the reliability of joining in actual size first wall. The technical issues to optimize the fabrication process of beryllium attachment were shown in this paper from an industrial point of view. Determination of the optimum size and the surface qualities of beryllium tiles are important issues in term of the material specification to ensure joining reliability and to reduce cost. The consolidation method and the finish machining methods of beryllium tiles are also critical in terms of material cost. These items should be determined by paying concern to the accommodation of the joining methods. The selections of slitting methods for attached beryllium have a great influence on fabrication cost. In the actual fabrication of beryllium attachment, safety provisions for exposure to beryllium in working environment and the recycling of the waste from the fabrication processes will be concerned sufficiently. (author)

  9. Review on technical issues influencing the performance of chemical barriers of TRU waste repository

    International Nuclear Information System (INIS)

    Fujita, Tomonari; Sugiyama, Daisuke; Tsukamoto, Masaki; Yokoyama, Hayaichi

    1997-01-01

    Studies of technical issues influencing the performance assessment of TRU waste disposal which is occurred from the nuclear fuel reprocessing were reviewed in related to the development of safety analysis method. Especially, the chemical containment was investigated as a key barrier to radionuclide migration. TRU waste including long-lived radionuclides need long-term performance assessment which could be assumed only by the chemical barrier. The description of technical issues concerned with the performance of TRU waste repository has been divided into the following categories: long-term degradation of cementitious materials as engineered barrier for radionuclide migration, effect of colloids, organic macromolecules and organic degradation products on chemical behavior of radionuclides, gas generation by corrosion of metallic wastes, and effects of microbial activity. Preliminary performance assessment indicated that important factors affecting performance of chemical barriers in near-field were the distribution coefficient and the solubility of radionuclides in near-field groundwater. Therefore, it was identified that key issues associated with performance of chemical barrier were evaluation of (a) the long-term change of distribution coefficient of cementitious material through the degradation under repository condition and (b) chemical speciation change of radionuclides such as increase of solubility by the presence of colloidal-size materials. (author)

  10. Regulatory and technical reports compilation for 1980

    International Nuclear Information System (INIS)

    Oliu, W.E.; McKenzi, L.

    1981-04-01

    This compilation lists formal regulatory and technical reports and conference proceedings issued in 1980 by the US Nuclear Regulatory Commission. The compilation is divided into four major sections. The first major section consists of a sequential listing of all NRC reports in report-number order. The second major section of this compilation consists of a key-word index to report titles. The third major section contains an alphabetically arranged listing of contractor report numbers cross-referenced to their corresponding NRC report numbers. Finally, the fourth section is an errata supplement

  11. Evaluation of systems interactions in nuclear power plants: Technical findings related to Unresolved Safety Issue A-17

    International Nuclear Information System (INIS)

    Thatcher, D.

    1989-05-01

    This report presents a summary of the activities related to Unresolved Safety Issue (USI)A-17, ''Systems Interactions in Nuclear Power Plants,'' and also includes the NRC staff's conclusions based on those activities. The staff's technical findings provide the framework for the final resolution of this unresolved safety issue. The final resolution will be published later as NUREG-1229. 52 refs., 4 tabs

  12. Approaching Technical Issues in Architectural Education

    DEFF Research Database (Denmark)

    Pugnale, Alberto; Parigi, Dario

    2012-01-01

    This paper discusses teaching of technical subjects in architecture, presenting two experimental activities, recently organized at Aalborg University - a two week long workshop and a one day long lecture. From the pedagogical point of view, the activities are strategically placed between conventi......This paper discusses teaching of technical subjects in architecture, presenting two experimental activities, recently organized at Aalborg University - a two week long workshop and a one day long lecture. From the pedagogical point of view, the activities are strategically placed between...

  13. Endogeneity Corrected Stochastic Production Frontier and Technical Efficiency

    NARCIS (Netherlands)

    Shee, A.; Stefanou, S.E.

    2015-01-01

    A major econometric issue in estimating production parameters and technical efficiency is the possibility that some forces influencing production are only observed by the firm and not by the econometrician. Not only can this misspecification lead to a biased inference on the output elasticity of

  14. Issues in target R and D

    International Nuclear Information System (INIS)

    Watanabe, Noboru

    1999-01-01

    Various important technical issues in the design study of an intense pulsed spallation neutron source are discussed. A design concept of the target-moderator-reflector system for the JAERI 5 MW pulsed spallation source is proposed, with some new ideas, based on these discussions. Various important design parameters which have great influence on the neutronic performance and major engineering issues are clarified. After extensive optimization studies the predicted neutronic performance of this source is compared with those in other similar projects to judge the proposed concept with its optimized design parameters. The performance was found to be very high. However, there still exist many rooms for further optimization studies. A great deal of engineering efforts are also indispensable to solve the technical problems. (author)

  15. Issues in target R and D

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Noboru [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-03-01

    Various important technical issues in the design study of an intense pulsed spallation neutron source are discussed. A design concept of the target-moderator-reflector system for the JAERI 5 MW pulsed spallation source is proposed, with some new ideas, based on these discussions. Various important design parameters which have great influence on the neutronic performance and major engineering issues are clarified. After extensive optimization studies the predicted neutronic performance of this source is compared with those in other similar projects to judge the proposed concept with its optimized design parameters. The performance was found to be very high. However, there still exist many rooms for further optimization studies. A great deal of engineering efforts are also indispensable to solve the technical problems. (author)

  16. Technical Issues and Proposes on the Legislation of Probabilistic Safety Assessment in Periodic Safety Review

    International Nuclear Information System (INIS)

    Hwang, Seok-Won; Jeon, Ho-Jun; Na, Jang-Hwan

    2015-01-01

    Korean Nuclear Power Plants have performed a comprehensive safety assessment reflecting design and procedure changes and using the latest technology every 10 years. In Korea, safety factors of PSR are revised to 14 by revision of IAEA Safety Guidelines in 2003. In the revised safety guidelines, safety analysis field was subdivided into deterministic safety analysis, PSA (Probabilistic safety analysis), and hazard analysis. The purpose to examine PSA as a safety factor on PSR is to make sure that PSA results and assumptions reflect the latest state of NPPs, validate the level of computer codes and analytical models, and evaluate the adequacy of PSA instructions. In addition, its purpose is to derive the plant design change, operating experience of other plants and safety enhancement items as well. In Korea, PSA is introduced as a new factor. Thus, the overall guideline development and long-term implementation strategy are needed. Today in Korea, full-power PSA model revision and low-power and shutdown (LPSD) PSA model development is being performed as a part of the post Fukushima action items for operating plants. The scope of the full-power PSA is internal/external level 1, 2 PSA. But in case of fire PSA, the scope is level 1 PSA using new method, NUREG/CR-6850. In case of LPSD PSA, level 1 PSA for all operating plants, and level 2 PSA for 2 demonstration plants are under development. The result of the LPSD PSA will be used as major input data for plant specific SAMG (Severe Accident Management Guideline). The scope of PSA currently being developed in Korea cannot fulfill 'All Mode, All Scope' requirements recommended in the IAEA Safety Guidelines. Besides the legislation of PSA, step-by-step development strategy for non-performed scopes such as level 3 PSA and new fire PSA is one of the urgent issues in Korea. This paper suggests technical issues and development strategies for each PSA technical elements.

  17. Subsurface Contaminant Focus Area: Monitored Natural Attenuation (MNA)--Programmatic, Technical, and Regulatory Issues

    Energy Technology Data Exchange (ETDEWEB)

    Krupka, Kenneth M.; Martin, Wayne J.

    2001-07-23

    Natural attenuation processes are commonly used for remediation of contaminated sites. A variety of natural processes occur without human intervention at all sites to varying rates and degrees of effectiveness to attenuate (decrease) the mass, toxicity, mobility, volume, or concentration of organic and inorganic contaminants in soil, groundwater, and surface water systems. The objective of this review is to identify potential technical investments to be incorporated in the Subsurface Contaminant Focus Area Strategic Plan for monitored natural attenuation. When implemented, the technical investments will help evaluate and implement monitored natural attenuation as a remediation option at DOE sites. The outcome of this review is a set of conclusions and general recommendations regarding research needs, programmatic guidance, and stakeholder issues pertaining to monitored natural attenuation for the DOE complex.

  18. Website design: technical, social and medical issues for self-reporting by elderly patients.

    Science.gov (United States)

    Taylor, Mark J; Stables, Rod; Matata, Bashir; Lisboa, Paulo J G; Laws, Andy; Almond, Peter

    2014-06-01

    There is growing interest in the use of the Internet for interacting with patients, both in terms of healthcare information provision and information gathering. In this article, we examine the issues in designing healthcare websites for elderly users. In particular, this article uses a year-long case study of the development of a web-based system for self-reporting of symptoms and quality of life with a view to examine the issues relating to website design for elderly users. The issues identified included the technical, social and medical aspects of website design for elderly users. The web-based system developed was based on the European Quality of Life 5-Dimensions health-status questionnaire, a commonly used tool for patient self-reporting of quality of life, and the more specific coronary revascularisation outcome questionnaire. Currently, self-reporting is generally administered in the form of paper-based questionnaires to be completed in the outpatient clinic or at home. There are a variety of issues relating to elderly users, which imply that websites for elderly patients may involve different design considerations to other types of websites.

  19. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    International Nuclear Information System (INIS)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung

    2016-01-01

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA

  20. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung [Kyung Hee Univ., Yongin (Korea, Republic of)

    2016-10-15

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA.

  1. Resolution of digital instrumentation and control and human factors technical and regulatory issues for new plants and for modernization of operating plants

    International Nuclear Information System (INIS)

    Naser, J.A.; Torok, R.C.; Canavan, K.T.

    2008-01-01

    There are several technical and regulatory issues in the areas of digital I and C, human factors, and control rooms needing generic resolution. If they are not generically resolved, they can contribute to protracted regulatory reviews for operating plant license amendments and substantial delays and increased costs for new plant COL approvals. Therefore; a coordinated, proactive program has been established to resolve key issues. Both Industry and NRC have roles in resolving these key issues and addressing them in future design efforts and regulatory reviews. The Industry initiative is led by the NEI Digital I and C and Human Factors Working Group. NRC has established Task Working Groups under the NRC Digital I and C Steering Committee to address the issues and interact with Industry. EPRI is providing technical input and resolution leadership for some of the issues being addressed in three of the task working groups. For the Highly Integrated Control Room - Human Factors Task area, EPRI has taken the lead in developing draft industry position technical reports for the following three issues: 1) Minimum inventory of human system interfaces, 2) Computerized procedures and associated topics of automation and soft controls, and 3) Methodology to determine the acceptability of manual operator actions response times for a BTP 7-19 software common cause failure. For the Diversity and Defense-in-Depth area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Integrating defensive measures and diversity attributes to protect against digital common cause failures and 2) Susceptibility of digital devices and components to common cause failures. For the Risk Informing area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Clarifying how to use current methods to model digital systems in a PRA and 2) Application of PRA to specific digital I and C issues

  2. Some Major Issues Influencing Nuclear Energy Prospective

    International Nuclear Information System (INIS)

    Feretic, D.

    2012-01-01

    The presentation analyses some issues which are of particular importance for future nuclear power application. These include duration of uranium reserves and high level radioactive waste decay period in function of uranium reserves (determined, assumed and speculative) and type of fuel cycle used. Public acceptance during essential historical milestones of nuclear power use, influence of safety and compatibility evaluations, quantified risk, externalities and nuclear accidents. Short review of major accidents, causes, consequences, impact of LNT and hormesis hypothesis. Particular problem for future of nuclear power is potential shortage of experienced personnel due to long period without plants construction. To address some of problems which may face future investors a brief review of specific events experienced during construction of NPP Krsko is presented. Such events could be of interest to countries planning to construct nuclear power plant.(author).

  3. Research on U.S. nuclear power plant major equipment aging

    International Nuclear Information System (INIS)

    Nakos, J.T.; Rosinski, S.T.

    1994-01-01

    The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), in cooperation with nuclear power plant utilities and the Nuclear Energy Institute, have prepared equipment aging evaluations of nuclear power plant equipment for life extension considerations. Specifically, these evaluations focused on equipment considered important for plant license renewal (U.S. Code of Federal Regulations 10CFR54). open-quotes Industry Reportsclose quotes (IRs), jointly funded by DOE and EPRI, evaluated the aging of major systems, structures, and components (e.g., reactor pressure vessels, Class I structures, PWR and BWR containments, etc.) and contain a mixture of technical and licensing information. open-quotes Aging Management Guidelinesclose quotes (AMGs), funded by DOE, evaluate aging for commodity types of equipment (e.g., pumps, electrical switchgear, heat exchangers, etc.) and concentrate on technical issues only. AMGs are intended for systems engineers and plant maintenance staff. A significant number of technical issues were resolved during IR interactions with the U.S. Nuclear Regulatory Commission (NRC). However, certain technical issues have not been resolved and are considered open-quotes openclose quotes. Examples include certain issues related to fatigue, neutron irradiation embrittlement, intergranular stress corrosion cracking (IGSCC) and electrical cable equipment qualification. Direct NRC interaction did not take place during preparation of individual AMGs due to their purely technical nature. The eventual use of AMGs in a future license renewal application will likely require NRC interaction at that time. With a few noted exceptions, the AMG process indicated that current aging management practices of U.S. utilities were effective in preventing age-related degradation. This paper briefly describes the IR and AMG processes and summarizes the unresolved technical issues identified through preparation of the documents

  4. Safety and man in light of the analysis of major technical accidents

    International Nuclear Information System (INIS)

    Carnino, A.

    1990-01-01

    Up to the seventies, it was not easy to admit human failure as a cause of industrial accidents. Man was considered as reliable. With the perfection of materials, technical systems and industrial processes though, man has become the weakest link in the chain of technical events. He is and stays a remarkably reliable being, with a roughly estimated average failure quota of 1:1000 manipulations. If the hypothetical risk should be kept very low, this value can become a problem. Instead of judging a mistake as a punishable crime, as the present tendency will have it, a more differentiated, systematical approach is called for. By means of an analysis of four major accidents - Chernobyl, Three Mile Island, Challenger and Bhopal - interesting parallels between the causes of such accidents can be found. Human failure, e.g. of a surgeon, is in most cases, the direct cause of an accident. A whole series of further causes, which can be assigned to different areas of influence but are usually interdependent, also play a role. While the human factor must be viewed as more or less predetermined, far reaching improvements can be made to reduce the risk of accident. Today, thanks to modern technology and new findings, it is possible to practically neutralize human error. This creates more costs and necessitates giving up short term production maximization. It also requires the willingness to give safety absolute priority. The name 'culture de surete' (safety culture) is used to describe this concept. Surprising similarities between the causes of the four mentioned major accidents were discovered. Certain circumstances, such as the time of day, played a role. The concept of a plant, resp. technical process has an essential influence, as well as company policy (importance of safety, preparation of emergency procedures, training, maintenance, company rules) and management (evaluation and realization of foreign and the company's own operation experiences and error alarms). (author) 7

  5. Major unresolved issues preventing a timely resolution to radioactive waste disposal

    International Nuclear Information System (INIS)

    1978-01-01

    GAO surveyed a portion of the literature on radioactive waste management and identified those major issues which could impede the timely and comprehensive removal of obstacles to demonstrating a national radioactive waste disposal program. Presently, U.S. radioactive waste policy goals are unclear in that there is no clear differentiation of management, regulation (licensing), and research, development, and demonstration functions. Decisions on such important issues as regulatory responsibility over radioactive wastes, criteria for radioactive waste form and performance, method of final disposition, and repository site locations must be made, and made soon, in order to assure public health and safety and adequate management of these potentially hazardous materials

  6. Technical evaluation report of the Fort St. Vrain final draft upgraded technical specifications

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1989-01-01

    This report is a technical evaluation of the final draft of the Fort St. Vrain (FSV) Upgraded Technical Specifications (UT/S) as issued by Public Service of Colorado (PSC) on May 27, 1988 with subsequent supplemental updates issued on June 15, 1988 and August 5, 1988. It has been compared for consistency, and safety conservatism with the Fort St. Vrain (FSV) Updated Final Safety Analysis Report (FSAR), the FSV Safety Evaluation Report (SER), the Facility Operating License, DPR-34, and all amendments to the Facility Operating License issued as of June 1, 1988, and Appendix A to the Operating License DPR-34, Technical Specifications. Because of the age of the plant, no supplements to the Fort St. Vrain SER have been issued since the original SER was not issued as a WASH or a NUREG report. This made it necessary to review all amendments to the Facility Operating License since they would contain the safety evaluations done to support changes to the Facility Operating License. The upgraded Fort St. Vrain Technical Specifications were also broadly compared with the latest Westinghouse Standard Technical Specifications (WSTS) to assure that what was proposed for Fort St. Vrain was consistent with the latest NRC staff practices for standard technical specifications

  7. Technical resolution of Generic Safety Issue A-29

    International Nuclear Information System (INIS)

    1989-09-01

    This report summarizes key technical findings related to Generic Safety Issue A-29, ''Nuclear Power Plant Design for Reduction of Vulnerability to Industrial Sabotage.'' The findings in this report deal with (1) a historical review of reported sabotage-related events at nuclear facilities, (2) NRC physical security requirements, (3) industry measures to prevent/mitigate sabotage, (4) design and procedural approaches that could be used to deter sabotage, (5) current NRC and industry initiatives aimed at personnel screening and selection, and (6) design considerations applicable to Advanced Light Water Reactors (ALWRs). The results reveal that insider sabotage at operating nuclear plants has not been a significant problem in the United States to date and that there are no singular design modifications or procedures that by themselves would completely eliminate or mitigate the threat of insider sabotage. Rather, it will take a combination of systematic and focused improvements in the three areas of reliable personnel, effective design features, and plant procedures developed to provide a strategy to deal with prevention of insider sabotage and to be able to mitigate adverse actions. 24 refs., 2 figs., 5 tabs

  8. Approaching socio-technical issues in Knowledge Communication

    DEFF Research Database (Denmark)

    Kampf, Constance; Islas Sedano, Carolina

    2008-01-01

    This paper looks at the connection between technology, knowledge management and knowledge communication theory from a process perspective. Knowledge management and knowledge communication processes are examined through the iterations in creating project goals and objectives which connect the social...... and objectives with respect to knowledge communication theory, demonstrating the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication....

  9. Technical Issues Map for the NHI System Interface and Support Systems Area: 2nd Quarter FY07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway in the 2nd quarter of FY07

  10. SKB annual report 1993. Including summaries of technical reports issued during 1993

    International Nuclear Information System (INIS)

    1994-05-01

    This is the annual report on the activities of the Swedish Nuclear and Waste Management Co., SKB. It contains in part I an overview of SKB activities in different fields. Part II gives a description of the research and development work on nuclear waste disposal performed during 1993. Lectures and publications during 1993 as well as reports issued in the SKB technical series are listed in part III. Part IV contains the summaries of all technical reports issued during 1993. SKB is the owner of CLAB, the Central Facility for Interim Storage of Spent Nuclear Fuel, located at Oskarshamn. CLAB was taken into operation in July 1985 and to the end of 1993 in total 1 885 tonnes of spent fuel (measured as uranium) have been received. Transportation from the nuclear sites to CLAB is made by a special ship, M/S Sigyn. At Forsmark the final repository for Radioactive Waste - SFR - was taken into operation in April 1988. The repository is situated in crystalline rock under the Baltic Sea. At the end of 1993 a total of 13 000 m 3 of waste have been deposited in SFR. SKB is in charge of a comprehensive research and development programme on geological disposal of nuclear waste. Some of the main areas for SKB research are: Groundwater movements; Bedrock stability; Groundwater chemistry and nuclide migration; Methods and instruments for in situ characterization of crystalline bedrock; Characterization and leaching of spent nuclear fuel; Properties of bentonite for buffer, backfilling and sealing; Radionuclide transport in biosphere and dose evaluations; Development of performance and safety assessment methodology and assessment models; Construction of an underground research laboratory

  11. Type B liquid package technical issues -- Experience with LR-56 safety analysis

    International Nuclear Information System (INIS)

    Smith, A.C.; Alstine, M.N. van; Gromada, R.J.; Hensel, S.J.; Gupta, N.K.

    1997-01-01

    In the course of the development of nuclear industry in France, shipment of Type B quantities (i.e., quantities having significant radiological consequences) of radioactive liquids between different, sites became necessary. Based on the experience acquired at the Commissariat a l'Energie Atomique (CEA) nuclear centers, a series of tanker trailers has been developed to meet this need. Similarly, as part of the ongoing program to process wastes to stable end forms, a need exists to move radioactive liquids at several DOE sites. The LR-56, developed by CEA to transport liquids of medium to high activity, was selected for these US applications, based on its design features and successful operating experience in France. No comparable Type B liquid packages are certified in the US Packages employed in transport of Type B quantities of liquids are either only suitable for small volumes, or are used within site boundaries with extensive administrative controls employed to insure that an adequate level of safety is maintained. The requirement is to provide safety equivalent to the level established by federal regulations in 10 CFR 71. Type B radioactive materials packages (RAM packages) are typically simple, rugged containers which are designed and fabricated in accordance with the ASME Boiler and Pressure Vessel Code to provide containment under the normal conditions of transport (NCT) and hypothetical accident conditions (HAC) established by the regulations. Packages designed for liquid contents must address a number of technical issues which are not common to packages for solid contents. This paper reviews the technical issues associated with Type B liquid packages from the perspective of the experience gained from the evaluation of the LR-56 for use at DOE sites

  12. Quantifying the perceived risks associated with nuclear energy issues

    International Nuclear Information System (INIS)

    Sandquist, G.M.

    2004-01-01

    A mathematical model is presented for quantifying and assessing perceived risks in an empirical manner. The analytical model provides for the identification and assignment of any number of quantifiable risk perception factors that can be incorporated within standard risk methodology. The set of risk perception factors used to demonstrate the model are those that have been identified by social and behavioural scientists as principal factors influencing people in their perception of risks associated with major technical issues. These same risk factors are commonly associated with nuclear energy issues. A rational means is proposed for determining and quantifying these risk factors for a given application. The model should contribute to improved understanding of the basis and logic of public risk perception and provide practical and effective means for addressing perceived risks when they arise over important technical issues and projects. (author)

  13. Medical school accreditation in Australia: Issues involved in assessing major changes and new programs

    Directory of Open Access Journals (Sweden)

    Michael J. Field

    2011-06-01

    Full Text Available The Australian Medical Council (AMC is an independent company for quality assurance and quality improvement in medical education in Australia and New Zealand. Accreditation procedures for the 20 medical schools in these two countries are somewhat different for three different circumstances or stages of school development: existing medical schools, established courses undergoing major changes, and new schools. This paper will outline some issues involved in major changes to existing courses, and new medical school programs. Major changes have included change from a 6 year undergraduate course to a 5 year undergraduate course or 4 year graduate-entry course, introduction of a lateral graduate-entry stream, new domestic site of course delivery, offshore course delivery, joint program between two universities, and major change to curriculum. In the case of a major change assessment, accreditation of the new or revised course may be granted for a period up to two years after the full course has been implemented. In the assessment of proposals for introduction of new medical courses, six issues needing careful consideration have arisen: forward planning, academic staffing, adequate clinical experience, acceptable research program, adequacy of resources, postgraduate training program and employment.

  14. Overview of Major Issues of Tax Treaties Law in Kosovo

    OpenAIRE

    Bedri Peci

    2015-01-01

    The aim of this research is to analyze and find out the major issue of tax treaties law in Kosovo. In this analysis we have used the research method of case study. The results of research show that the legal framework for the elimination of double taxation, after 1999, initially started its establishment journey from the United Nations Administration Mission in Kosovo (UNMIK). Taking into consideration the specifications of the political status, the process for the establishment of the unilat...

  15. Engaging Local Stakeholders on Technical Issues: Test Case at the La Hague Reprocessing Plant - 59211

    International Nuclear Information System (INIS)

    Gilli, Ludivine

    2012-01-01

    In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) lead a pilot action dealing with the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of the pilot program was to test ways for IRSN and a few local stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the local stakeholders to review the operator's decommissioning application and provide input. The pilot program confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues. Three factors influence the extent of the challenge: the knowledge gap between experts and local stakeholders, the conflict between transparency and confidentiality which is inherent with technical topics, and the difficulty for an official expertise institute to hold a dialogue with 'outsiders' during an ongoing reviewing process in which it is participating. The pilot program, given its mixed results, also provided valuable lessons for further improvement of stakeholders' involvement. (authors)

  16. Critical technical issues and evaluation and comparison studies for inertial fusion energy reactors

    International Nuclear Information System (INIS)

    Abdou, M.A.; Ying, A.Y.; Tillack, M.S.; Ghoniem, N.M.; Waganer, L.M.; Driemeyer, D.E.; Linford, G.J.; Drake, D.J.

    1994-01-01

    The critical issues, evaluation and comparison of two inertial fusion energy (IFE) reactor design concepts developed in the Prometheus studies are presented. The objectives were (1) to identify and characterize the critical issues and the R and D required to solve them, and (2) to establish a sound basis for future IFE technical and programmatic decisions by evaluating and comparing the different design concepts. Quantitative evaluation and comparison of the two design options have been made with special focus on physics feasibility, engineering feasibility, economics, safety and environment, and research and development (R and D) requirements. Two key conclusions are made based on the overall evaluation analysis: (1) The heavy-ion driven reactors appear to have an overall advantage over laser-driven reactors; and: (2) The differences in scores are not large and future results of R and D could change the overall ranking of the two IFE concepts

  17. Major issues associated with nuclear power generation cost and their evaluation

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Shimogori, Kei; Suzuki, Atsuhiko

    2015-01-01

    This paper discusses the evaluation of power generation cost that is an important item for energy policy planning. Especially with a focus on nuclear power generation cost, it reviews what will become a focal point on evaluating power generation cost at the present point after the estimates of the 'Investigation Committee on Costs' that was organized by the government have been issued, and what will be a major factor affecting future changes in costs. This paper firstly compared several estimation results on nuclear power generation cost, and extracted/arranged controversial points and unsolved points for discussing nuclear power generation cost. In evaluating nuclear power generation cost, the comparison of capital cost and other costs can give the understanding of what can be important issues. Then, as the main issues, this paper evaluated/discussed the construction cost, operation/maintenance cost, external cost, issue of discount rate, as well as power generation costs in foreign countries and the impact of fossil fuel prices. As other issues related to power generation cost evaluation, it took up expenses for decommissioning, disposal of high-level radioactive waste, and re-processing, outlined the evaluation results by the 'Investigation Committee on Costs,' and compared them with the evaluation examples in foreign countries. These costs do not account for a large share of the entire nuclear power generation costs. The most important point for considering future energy policy is the issue of discount rate, that is, the issue of fund-raising environment for entrepreneurs. This is the factor to greatly affect the economy of future nuclear power generation. (A.O.)

  18. Tanks Focus Area FY98 midyear technical review

    Energy Technology Data Exchange (ETDEWEB)

    Schlahta, S.N.; Brouns, T.M.

    1998-06-01

    The Tanks Focus Area (TFA) serves as the DOE`s Office of Environmental Management`s national technology and solution development program for radioactive waste tank remediation. Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. In total, 17 technologies and technical solutions were selected for review. The purpose of each review was to understand the state of development of each technology selected for review and to identify issues to be resolved before the technology or technical solution progressed to the next level of maturity. The reviewers provided detailed technical and programmatic recommendations and comments. The disposition of these recommendations and comments and their impact on the program is documented in this report.

  19. Tanks Focus Area FY98 midyear technical review

    International Nuclear Information System (INIS)

    Schlahta, S.N.; Brouns, T.M.

    1998-06-01

    The Tanks Focus Area (TFA) serves as the DOE's Office of Environmental Management's national technology and solution development program for radioactive waste tank remediation. Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. In total, 17 technologies and technical solutions were selected for review. The purpose of each review was to understand the state of development of each technology selected for review and to identify issues to be resolved before the technology or technical solution progressed to the next level of maturity. The reviewers provided detailed technical and programmatic recommendations and comments. The disposition of these recommendations and comments and their impact on the program is documented in this report

  20. BWR feedwater nozzle and control rod drive return line nozzle cracking: resolution of generic technical activity A-10. Technical report

    International Nuclear Information System (INIS)

    Snaider, R.

    1980-11-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-10, 'BWR Nozzle Cracking'. Generic Technical Activity A-10 is one of the generic technical subjects designated as 'unresolved safety issues' pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical issues, the technical studies and analyses performed by the General Electric Company and the NRC staff, the staff's technical positions based on these studies, and the staff's plans for continued implementation of its technical positions. It also provides information for further work to resolve the non-destructive examination issue

  1. Chernobyl, Three Mile Island and beyond: Lessons for Ontario? Current issue paper 117

    Energy Technology Data Exchange (ETDEWEB)

    Yeager, K L

    1991-03-01

    This current issue paper reviews major accidents which have occurred at commercial and military nuclear facilities, and provides basic background on nuclear power and reactor design features to assist the novice in understanding the very complex technical issues surrounding these events. Above all, the role of human factors in the prevention of potential accident situations is emphasized. (author).

  2. Chernobyl, Three Mile Island and beyond: Lessons for Ontario? Current issue paper 117

    International Nuclear Information System (INIS)

    Yeager, K.L.

    1991-03-01

    This current issue paper reviews major accidents which have occurred at commercial and military nuclear facilities, and provides basic background on nuclear power and reactor design features to assist the novice in understanding the very complex technical issues surrounding these events. Above all, the role of human factors in the prevention of potential accident situations is emphasized. (author)

  3. KBS Annual Report 1983. Including summaries of technical reports issued during 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The purpose of the KBS Annual Report is to inform interested organizations and individuals of the research and development work performed by the division KBS within the Swedish Nuclear Fuel Supply Co (SKBF) on the handling, treatment and final storage of nuclear wastes in Sweden. The Annual Report normally contains a presentation of the legal and organizational situation followed by an account of the progress within different areas of the R and D-work. This account also includes indications of the activities planned for the future. At the end of the report the summaries of 76 technical reports and other publications issued during the year are listed in special appendices. (K.A.E.)

  4. The issue resolution process in the Civilian Radioactive Waste Transportation Program

    International Nuclear Information System (INIS)

    Holm, J.A.; Denny, S.

    1987-01-01

    The Civilian Radioactive Waste Management (OCRWM) Program consists of various technical and institutional program activities which engender concern from the general public and from policymakers at federal, state, and local levels. Most familiar are the concerns centered around selection of a site for a repository; however, the transportation portion of the OCRWM program also engenders similar concerns for safety, efficiency and effectiveness. The major Transportation institutional issues were detailed in the Institutional Plan, issued in 1986, and include topics such as liability, defense waste, routing, emergency response, risk identification and mitigation, cash integrity, inspection and enforcement of high-level waste shipments and use of overweight trucks as part of the modal mix. This paper will define the process being used to identify and resolve institutional issues, show how the technical and institutional issues interface and are addressed, and briefly describe four specific activities which illustrate the process of resolving institutional issues in the Transportation program

  5. Fitness for duty in the nuclear power industry: A review of technical issues

    International Nuclear Information System (INIS)

    Moore, C.; Barnes, V.; Hauth, J.

    1989-05-01

    This report presents information gathered and analyzed in support of the US Nuclear Regulatory Commission's (NRC's) efforts to develop a rule that will ensure that workers with unescorted access to protected areas of nuclear power plants are fit for duty. This report supplements information previously published in NUREG/CR-5227, Fitness for Duty in the Nuclear Power Industry: A Review of Technical Issues (Barnes et al., 1988). The primary potential fitness-for-duty concern addressed in both of these reports is impairment caused by substance abuse, although other fitness concerns are discussed. This report addresses issues pertaining to workers' use and misuse of alcohol, prescription drugs, and over-the-counter drugs as fitness-for-duty concerns; responds to several questions raised by NRC Commissioners; discusses subversion of the chemical testing process and methods of preventing such subversion; and examines concerns about the urinalysis cutoff levels used when testing for marijuana metabolites, amphetamines, and phencyclidine

  6. Experimental results obtained with the simulated cold moderator system. System characteristics and technical issues

    CERN Document Server

    Aso, T; Hino, R; Kaminaga, M; Kinoshita, H; Takahashi, T

    2002-01-01

    The Japan Atomic Energy Research Institute and the High Energy Accelerator Research Organization have been developing a Mega-Watt scale spallation target system. In the system, neutrons generated in a target are sorted out their energy to the proper values in liquid-hydrogen moderators. Then, the liquid-hydrogen is forced to circulate in order to suppress hydrogen temperature increase. In the operation of moderators, it is very important to establish a safety protection system against emergency shutdown of the accelerator or accidents of the cold moderator system. In order to obtain a technical data for design and safety review of the liquid-hydrogen system, we have fabricated an experimental apparatus simulated the cold moderator system using liquid nitrogen (max. 1.5 MPa, mini. 77 K) instead of liquid hydrogen. The experiments on a controllability of the system were carried out to investigate dynamic characteristics of the system. This report presents the experimental results and technical issues for the co...

  7. Use of Career Education and Occupation Information Services in Boosting Enrolment into Vocational and Technical Education Programs in Nigeria

    Science.gov (United States)

    Igbinedion, V. I.; Ojeaga, I. J.

    2012-01-01

    The major thrust of technical and vocational education (TVE) worldwide is to address issues of youth unemployment, poverty and international competitiveness in skills development towards current and projected opportunities and challenges. The paper posits that despite the evidence of numerous reforms in vocational and technical education programs…

  8. Summary of breakout Session F1: F1, decision support systems - technical databases

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The discussions in breakout session F1 are summarized. The topics discussed include oil properties database, case histories database, technical experts database, sorbents database, dispersants database, equipment inventories, and response information. General comments and concerns were discussed and major research issues outlines

  9. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  10. Technology assessment of future intercity passenger transporation systems. Volume 2: Identification of issues affecting intercity transportation

    Science.gov (United States)

    1976-01-01

    Papers on major issues and trends that affect the future of intercity transportation are presented. Specific areas covered include: political, social, technological, institutional, and economic mechanisms, the workings of which determine how future intercity transporation technologies will evolve and be put into service; the major issues of intercity transportation from the point of view of reform, including candidate transporation technologies; and technical analysis of trends affecting the evolution of intercity transportation technologies.

  11. Five major controversial issues about fusion level selection in corrective surgery for adolescent idiopathic scoliosis: a narrative review.

    Science.gov (United States)

    Lee, Choon Sung; Hwang, Chang Ju; Lee, Dong-Ho; Cho, Jae Hwan

    2017-07-01

    treatment of adolescent idiopathic scoliosis have been resolved by understanding its mechanism and via technical advancement, no definite guideline for fusion level selection has been established. A review of five major controversial issues about fusion level selection could provide better understanding of adolescent idiopathic scoliosis. We believe that a thorough validation study of the abovementioned controversial issues can help address them. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. Technical bases for estimating fission product behavior during LWR accidents. Technical report

    International Nuclear Information System (INIS)

    1981-06-01

    The objective of this report is to provide the Nuclear Regulatory Commission and the public with a description of the best technical information currently available for estimating the release of radioactive material during postulated reactor accidents, and to identify where gaps exist in our knowledge. This report focuses on those low probability-high consequence accidents involving severe damage to the reactor core and core meltdown that dominate the risk to the public. Furthermore, in this report particular emphasis is placed on the accident behavior of radioactive iodine, as (1) radioiodine is predicted to be a major contributor to public exposure, (2) current regulatory accident analysis procedures focus on iodine, and (3) several technical issues have been raised recently about the magnitude of iodine release. The generation, transport, and attenuation of aerosols were also investigated in some detail to assess their effect on fission product release estimates and to determine the performance of engineered safety features under accident conditions exceeding their design bases

  13. Procurement activities required by the nuclear program developed by nuclearelectrica national company- technical issues versus public acquisitions legal issues

    International Nuclear Information System (INIS)

    Vatamanu, Mariana

    2007-01-01

    Public procurement is one of the areas of the single market where the results of the liberalization drive have not yet measured up to expectations. This communication presents some technical issues versus public acquisition legal issues and suggests ways and means of improving contract award procedures. Procurement area includes the acquisition of goods, services and works, thus assumption not only for purchasing equipment, components, spare-parts or materials, but also hiring of the contractors or consultants to carry out services and works. Procurement is related to the function of management of supply, which encompasses aside range of planning function, coding and classification, stockholding policies, store-keeping, stores accounting, etc. but it is also related to the hiring of contractors or consultants for work or services. As an answer to the challenge of the increasing market globalization it has been developed the ISO quality system, within 9000 family of standards. The very intensive competition for all market clients, either locally or globally, encouraged development of a new concept of quality management systems. Due to its specificity of activity and with respect to the rules and legislation requirements imposed either by the internal Romanian Laws and Regulations or/and by international market rules and constrains, the development, construction and operation of a Nuclear Power Plant shall be performed in a controlled condition and based on specific authorizations obtained by the Owner of the NPP from the Romanian Regulatory Authorities. The experience, accumulated by over 10 years of operation of Cernavoda NPP Unit 1 by our company, demonstrates the high importance of the Quality Management System that imposes the quality of the components installed on the plant, the services and the works developed to assure a safety operation of the nuclear unit, with a strongly dependence by the procurement system established for purchasing of goods, services and

  14. Environmental issues in China

    International Nuclear Information System (INIS)

    Travis, P.S.

    1991-10-01

    Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs

  15. Technical Issues in the development of high burnup and long cycle fuel pellets

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Joo; Yang, Jae Ho; Oh, Jang Soo; Kim, Keon Sik; Rhee, Young Woo; Kim, Jong Hun; Nam, Ik Hui [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-10-15

    Over the last half century, a nuclear fuel cycle, a fuel discharged burnup and a uranium enrichment of the LWR (Light Water Reactor) fuel have continuously increased. It was the efforts to reduce the LWR fuel cycle cost, and to make reactor operation more efficiently. Improved fuel and reactor performance contribute further to the reduction and management efficiency of spent fuels. The primary incentive for operating nuclear reactor fuel to higher burnup and longer cycle is the economic benefits. The fuel cycle costs could be reduced by extending fuel discharged burnup and fuel cycle length. The higher discharged burnup can increase the energy production per unit fuel mass or fuel assembly. The longer fuel cycle can increase reactor operation flexibility and reduce the fuel changing operation and the spent fuel management burden. The margin to storage capacity limits would be also increased because high burnup and long cycle fuel reduces the mass of spent fuels. However, increment of fuel burnup and cycle length might result in the acceleration of material aging consisting fuel assembly. Then, the safety and integrity of nuclear fuel will be degraded. Therefore, to simultaneously enhance the safety and economics of the LWR fuel through the fuel burnup and cycle extension, it is indispensable to develop the innovative nuclear fuel material concepts and technologies which can overcome degradation of fuel safety. New fuel research project to extend fuel discharged burnup and cycle length has been launched in KAERI. Main subject is to develop innovative LWR fuel pellets which can provide required fuel performance and safety at extended fuel burnup and cycle length. In order to achieve the mission, we need to know that what the impediments are and how to break through current limit of fuel pellet properties. In this study, the technical issues related to fuel pellets at high burnup were surveyed and summarized. We have collected the technical issues in the literatures

  16. Technical Issues in the development of high burnup and long cycle fuel pellets

    International Nuclear Information System (INIS)

    Kim, Dong Joo; Yang, Jae Ho; Oh, Jang Soo; Kim, Keon Sik; Rhee, Young Woo; Kim, Jong Hun; Nam, Ik Hui

    2012-01-01

    Over the last half century, a nuclear fuel cycle, a fuel discharged burnup and a uranium enrichment of the LWR (Light Water Reactor) fuel have continuously increased. It was the efforts to reduce the LWR fuel cycle cost, and to make reactor operation more efficiently. Improved fuel and reactor performance contribute further to the reduction and management efficiency of spent fuels. The primary incentive for operating nuclear reactor fuel to higher burnup and longer cycle is the economic benefits. The fuel cycle costs could be reduced by extending fuel discharged burnup and fuel cycle length. The higher discharged burnup can increase the energy production per unit fuel mass or fuel assembly. The longer fuel cycle can increase reactor operation flexibility and reduce the fuel changing operation and the spent fuel management burden. The margin to storage capacity limits would be also increased because high burnup and long cycle fuel reduces the mass of spent fuels. However, increment of fuel burnup and cycle length might result in the acceleration of material aging consisting fuel assembly. Then, the safety and integrity of nuclear fuel will be degraded. Therefore, to simultaneously enhance the safety and economics of the LWR fuel through the fuel burnup and cycle extension, it is indispensable to develop the innovative nuclear fuel material concepts and technologies which can overcome degradation of fuel safety. New fuel research project to extend fuel discharged burnup and cycle length has been launched in KAERI. Main subject is to develop innovative LWR fuel pellets which can provide required fuel performance and safety at extended fuel burnup and cycle length. In order to achieve the mission, we need to know that what the impediments are and how to break through current limit of fuel pellet properties. In this study, the technical issues related to fuel pellets at high burnup were surveyed and summarized. We have collected the technical issues in the literatures

  17. Experimental results obtained with the simulated cold moderator system. System characteristics and technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Aso, Tomokazu; Kaminaga, Masanori; Haga, Katsuhiro; Kinoshita, Hidetaka; Takahashi, Toshio; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-12-01

    The Japan Atomic Energy Research Institute and the High Energy Accelerator Research Organization have been developing a Mega-Watt scale spallation target system. In the system, neutrons generated in a target are sorted out their energy to the proper values in liquid-hydrogen moderators. Then, the liquid-hydrogen is forced to circulate in order to suppress hydrogen temperature increase. In the operation of moderators, it is very important to establish a safety protection system against emergency shutdown of the accelerator or accidents of the cold moderator system. In order to obtain a technical data for design and safety review of the liquid-hydrogen system, we have fabricated an experimental apparatus simulated the cold moderator system using liquid nitrogen (max. 1.5 MPa, mini. 77 K) instead of liquid hydrogen. The experiments on a controllability of the system were carried out to investigate dynamic characteristics of the system. This report presents the experimental results and technical issues for the construction of a practical liquid-hydrogen moderator system of the Mega-Watt scale target system. (author)

  18. Technical and ethical challenges of fertility preservation in young cancer patients.

    Science.gov (United States)

    Deepinder, Fnu; Agarwal, Ashok

    2008-06-01

    As cancer treatment improves, more young men and women survive, but they suffer from infertility as a major sequel of cancer treatment. Gamete and embryo cryopreservation are the only options available to these patients for preserving their fertility. Although cryopreservation of spermatozoa and embryos are already established, oocyte banking is still experimental. The advent of testicular tissue cryopreservation and spermatogonial stem cell transplantation in men, and ovarian tissue cryopreservation and in-vitro follicular maturation in women, has started a frenzy of experiments worldwide trying to demonstrate their potential use in fertility preservation. Although major improvements have been made in tissue cryobanking in the past decade, there are still many unresolved technical issues related to these procedures. Furthermore, the intersection of cancer and fertility preservation in young patients raises ethical, legal and policy issues for oncologists and cancer survivors. Informed consent of minor patients, legal parentage and medical negligence claims are some of the potential legal challenges faced by society and healthcare providers. This review summarizes the technical and ethical challenges of gamete cryopreservation in young cancer patients.

  19. Technical issues and a prospect of ICAI. Chiteki CAI no gijutsu kadai to kongo no doko

    Energy Technology Data Exchange (ETDEWEB)

    Otsuki, S. (Kyushu Institute of Technology, Kitakyushu (Japan))

    1992-12-10

    This paper explains technical issues and a prospect for intelligent computer assisted instruction (ICAI) which combines the intelligent tutoring system (ITS) with an open-ended (discovery) type education system. The paper summarizes the ITS characterized by modelling students based on error-origin diagnostic technologies; various functions that have been realized for the first time therefrom; different methods for error diagnosis and error-origin diagnosis; and criteria to evaluate these methods (evaluating generality, coverage, and tractability). The paper indicates that no complete diagnostic methods have been obtained according to these criteria, that, therefore, an issue of incompleteness in the student model still remains, and that unsolved issues in the ITS include some that exceed the framework of the ITS. Also mentioned in the paper are that the discovery type education system has a possibility of realizing an education with new quality, and that a new attempt is being performed to merge the ITS with the discovery type education system. 17 refs., 2 figs.

  20. Aligning Career and Technical Education

    Science.gov (United States)

    Workman, Ed; Stubbs, Joyce

    2011-01-01

    The issues and concerns facing Kentucky Career and Technical Teacher Education (KY CTTE), university teacher educators and state department Career and Technical Education (CTE) leaders in providing and preparing the best CTE teachers possible are not unique to Kentucky. In an effort to better understand these issues and concerns a team of state…

  1. Nuclear waste management: A review of issues

    International Nuclear Information System (INIS)

    Angino, E.E.

    1985-01-01

    The subject of radioactive waste management and burial is a subject that raises strong emotional and political issues and generates sharp technical differences of opinion. The overall problem can be subdivided into the three major categories of (1) credibility and emotionalism, (2) technology, and (3) nuclear waste isolation and containment. An area of concern desperately in need of attention is that of proper public education on all aspects of the high-level radioactive-waste (rad-waste) burial problem. A major problem related to the rad-waste issue is the apparent lack of an official, all-encompassing U.S. policy for nuclear waste management, burial, isolation, and regulation. It is clear from all past technical reports that disposal of rad wastes in an appropriate geologic horizon is the best ultimate solution to the waste problem. After 25 y of dealing with the high-level radioactive waste problem, the difficulty is that no proposed plan has to date been tested properly. It is this indecision and reaction that has contributed in no small way to the public perception of inability to solve the problem. One major change that has occurred in the last few years was the enactment of the Nuclear Waste Policy Act of 1982. This act mandates deadlines, guidelines, and state involvement. It is time that strong differences of opinions be reconciled. One must get on with the difficult job of selecting the best means of isolating and burying these wastes before the task becomes impossible

  2. Postclosure risks at the proposed Yucca Mountain repository: A review of methodological and technical issues

    International Nuclear Information System (INIS)

    Emel, J.; Kasperson, R.E.; Goble, R.; Renn, O.

    1988-06-01

    Accordingly, the first section of the report provides an overview and critique of the risk analysis methodology proposed by the US Department of Energy (DOE 1988) in the Draft Site Characterization Plan (SCP) and related documents. The second section addresses specific technical problems associated with the site. Each section considers the significance or implications of the issues for the successful long-term isolation of radioactive wastes from the biosphere. We conclude with overall observations on the adequacy of current understandings and approaches in the waste disposal program and implications for the State of Nevada

  3. Distributed generation - SHPP - Small hydroelectric power plants: technical and environmental issues; Geracao distribuida - PCH'S: aspectos tecnicos e ambientais

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Moacyr Trindade de Oliveira [Comissao de Servicos Publicos de Energia do Estado de Sao Paulo (CSPE), SP (Brazil)]. E-mail: mtandrade@sp.gov.br

    2004-07-01

    The Brazilian electrical system is presenting significant changes in its organizational structure in order to adapt to the new government's policies, market characteristics and the need for expansion of generation systems (supply), transmission and distribution (transport), and commercialization (demand) of energy. The previous structure propitiated the absolute control of the Union in the introduction of new plants, searching for a prioritization to their unit cost of energy, used as an 'Index of Merit' and expressed by U.S. $ / MWh, with planning costs increasing extent. This alternative did not address the environmental issues, referring only those technical aspects and costs of implementation. The socio-environmental issues were relegated to second plan. The significant interest of manufacturers prioritized the {sup b}ig construction{sup ,} as the simultaneous achievement of several big constructions enabling the consolidation of a constant flow of resources and sedimentary longevity of the situation. This paper aims to discuss and present the benefits of distributed generation electric power, with features to complement the offer, but with benefits for micro-regions in which they are deployed, based on technical, economic and socio environmental issues. (author)

  4. Evaluation of water-hammer experience in nuclear power plants. Technical findings relevant to Unresolved Safety Issue A-1

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1983-05-01

    This report summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. It should also be noted that this report does not represent a substitute for current rules and regulations

  5. Evaluation of water hammer occurrence in nuclear power plants: technical findings relevant to unresolved safety issue A-1

    International Nuclear Information System (INIS)

    1984-03-01

    This report, which includes responses to public comments, summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. This report does not represent a substitute for current rules and regulations

  6. Technical aspects, a starting point for debate

    International Nuclear Information System (INIS)

    Iracane, D.; Chaix, P.

    2002-01-01

    What was first viewed by scientists and engineers simply as a common technical problem has now become a major social issue. The choice of a long-term solution for waste from the nuclear industry takes into consideration all aspects of the controversy, now an integral part of R and D projects. Research, development, and innovation must provide a 'constructive' way out of this type of controversy. This is the conviction that scientists and sociologists have come to after two years of cooperation. (authors)

  7. Training of technical staff and technical staff managers

    International Nuclear Information System (INIS)

    Moody, G.F.

    1991-01-01

    The purpose of Technical Staff and Technical Staff Managers training is to provide job skills enhancement to individuals selected to fill key technical positions within a nuclear utility. This training is unique in that unlike other training programs accredited by the National Academy for Nuclear Training, it does not lead to specific task qualification. The problems encountered when determining the student population and curriculum are a direct result of this major difference. Major problems encountered are determining who should attend the training, what amount of training is necessary and sufficient, and how to obtain the best feedback in order to effect substantive program improvements. These topics will be explored and possible solutions discussed

  8. Selection of a new nuclear unit for Slovakia: possibilities and key technical issues

    International Nuclear Information System (INIS)

    Misak, J.

    2009-01-01

    Plans for construction of new nuclear unit at Jaslovske Bohunice brings forward the issue of selection of reactor design. This paper compares technical characteristics (safety and operational) of pressurized water reactors that are at present available in the market, such as AP 1000 (WEC), EPR (AREVA), AES 2006 (ASE), APWR 1700 (Mitsubishi) and APR 1400 (Korea Hydro and Nuclear). Selected parameters that require close attention in future negotiations with potential suppliers are discussed in detail. Compared are parameters as type of the reactor, reactor output power, quantified level of safety, compliance with national legislature and international safety requirements, operational flexibility in meeting requirements of the grid, using of verified technology, measures for coping with severe accidents, resistance against extreme external conditions etc. (authors)

  9. Environmental issues in China

    Energy Technology Data Exchange (ETDEWEB)

    Travis, P.S.

    1991-10-01

    Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs.

  10. Nuclear power debate: moral, economic, technical, and political issues

    International Nuclear Information System (INIS)

    Meyers, D. III.

    1977-01-01

    The pace at which nuclear power will develop is clouded with uncertainties. At the end of 1976 in the United States, 61 nuclear reactors were operating, representing slightly more than 9 percent of the country's total generating capacity. Another 168 reactors were either planned, under construction, or on order. Outside the United States, commitments to nuclear power grew by 17 percent in 1975 over 1974. Indonesia, Turkey, and Poland ordered nuclear plants, bringing to 41 the number of countries committed to nuclear energy. In 1976, 112 nuclear reactors were operating in 18 countries; an additional 342 plants were planned, on order, or under construction. The speed at which nuclear power will continue to grow is dependent on a number of factors: the rate at which demand for energy increases, the changing economics of alternative methods of energy production, the processes by which decisions affecting nuclear power development are made, and the degree to which they satisfy public concerns about the safety of nuclear energy. This book addresses itself to these factors as follows: Economic issues: At what rate will demand for energy increase, and how can that demand be met. (Chapter 2.) How cost-competitive are the major alternative methods of producing electricity that now exist--nuclear power and coal. (Chapter 3.) Decision making issues: Are the processes by which decisions to proceed with development of nuclear power, both in government and in industry, adequate to protect the interests of the public and of investors. (Chapters 4 and 5.) Safety issues: Are nuclear power plants themselves safe. (Chapters 6 and 7.) Can adequate safeguards be established to ensure protection against misuse of the products or by-products of those plants and to ensure the permanent safe storage of radioactive wastes

  11. Technical and perceptual issues on head-related transfer functions sets for use in binaural synthesis

    DEFF Research Database (Denmark)

    Toledo, Daniela

    of binaural synthesis in providing a realistic and/or convincing virtual sonic experience relies largely on technical and perceptual issues inherent to the HRTFs and their use, particularly on how well the spectral features of the HRTFs used match those of the listener. This PhD thesis focused on identifying...... the spectral features that cue sound localization in the mid-sagittal plane. Listening tests were conducted from which groups of individual and non-individual HRTFs that evoked the same direction were obtained. Analysis of these HRTFs suggested that the relevant spectral cues covered a broad range...

  12. Biomass Gasification - A synthesis of technical barriers and current research issues for deployment at large scale

    Energy Technology Data Exchange (ETDEWEB)

    Heyne, Stefan [Chalmers Univ. of Technology, Gothenburg (Sweden); Liliedahl, Truls [KTH, Royal Inst. of Technology, Stockholm (Sweden); Marklund, Magnus [Energy Technology Centre, Piteaa (Sweden)

    2013-09-01

    Thermal gasification at large scale for cogeneration of power and heat and/or production of fuels and materials is a main pathway for a sustainable deployment of biomass resources. However, so far no such full scale production exists and biomass gasification projects remain at the pilot or demonstration scale. This report focuses on the key critical technology challenges for the large-scale deployment of the following biomass-based gasification concepts: Direct Fluidized Bed Gasification (FBG), Entrained Flow Gasification (EFG) and indirect Dual Fluidized Bed Gasification (DFBG). The main content in this report is based on responses from a number of experts in biomass gasification obtained from a questionnaire. The survey was composed of a number of more or less specific questions on technical barriers as to the three gasification concepts considered. For formalising the questionnaire, the concept of Technology Readiness Level (TRL 1-9) was used for grading the level of technical maturity of the different sub-processes within the three generic biomass gasification technologies. For direct fluidized bed gasification (FBG) it is mentioned that the technology is already available at commercial scale as air-blown technology and thus that air-blown FBG gasification may be reckoned a mature technology. The remaining technical challenge is the conversion to operation on oxygen with the final goal of producing chemicals or transport fuels. Tar reduction, in particular, and gas cleaning and upgrading in general are by far the most frequently named technical issues considered problematic. Other important aspects are problems that may occur when operating on low-grade fuels - i.e. low-cost fuels. These problems include bed agglomeration/ash sintering as well as alkali fouling. Even the preparation and feeding of these low-grade fuels tend to be problematic and require further development to be used on a commercial scale. Furthermore, efficient char conversion is mentioned by

  13. Parliamentarian sovereignty and technical development

    International Nuclear Information System (INIS)

    Dreier, H.; Hofmann, J.

    1986-01-01

    The title indicates the points of main emphasis of the contributions, and points to the programme embodied in the volume. The question is - given the tremendous and ever increasing amount of secondary problems associated with a heated technology development - whether the 'sovereign' state is at all capable of controlling, piloting and fostering technic-scientific processes. The first part ('sovereignty and parliamentarian legislator state') concentrates on the history of notions and ideas in the concept of the sovereign, modern state, and on the constitutional law in force (Dreier, Frohn); the current efficiency of parliament as an organ of control in the process of legislation is investigated (Schulze-Fielitz). The central concern of part 2 ('environmental law and technical development') are topical questions of environmental law (Hofmann, Luebbe-Wolff). Besides the analysis of dogmatic problems of a special administrative law, the major issue is whether and in how far - given modern large-scale technologies - law can adequately govern technique (Schmidt). By analyzing the relationship between technical development and possibilities for guidance by a parliamentarian constitutional state, the articles deal with a central point of intersection between state and administrative law. (orig./HP) [de

  14. Dynamics of Major Cereals Productivity in Nepal

    Directory of Open Access Journals (Sweden)

    Samaya Gairhe

    2018-05-01

    Full Text Available Cereal crops have played major roles in addressing food security issues in Nepal. In recent years there have been fluctuations in crop production and demands situations due to various reasons. Thus, the present study aims to analyze the dynamics of major cereals productivity in Nepal from 1995 to 2014. Focus group discussions were done in mid-hills and tarai of Nepal in 2015. Percentage change, compound growth rate, annual rate of change, coefficient of variation, instability index were calculated to analyze results. The result shows that the area, production and productivity of major cereals had an increasing trend over the study period. The major factors contributing on productivity increase in cereal crops were irrigation facilities, use of improved and hybrid seeds, chemical fertilizer and better technical knowhow among the farmers. For effective adoption of research outputs to improve the productivity emphasis should also be given on promotion of public private partnership (PPP in research and development.

  15. Assessment and management of ageing of major nuclear power plant components important to safety: Steam generators

    International Nuclear Information System (INIS)

    1997-11-01

    This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety which was issued by the IAEA in 1992. They have been compiled using contributions from technical experts in typically 10 to 12 countries for each report, a feedback from a September 1994 Technical Committee Meeting attended by 53 technical experts from 21 Member States (who reviewed first drafts in specialized working groups), and review comments from invited specialists

  16. Technical issues of reduced activation ferritic/martensitic steels for fabrication of ITER test blanket modules

    International Nuclear Information System (INIS)

    Tanigawa, H.; Hirose, T.; Shiba, K.; Kasada, R.; Wakai, E.; Serizawa, H.; Kawahito, Y.; Jitsukawa, S.; Kimura, A.; Kohno, Y.; Kohyama, A.; Katayama, S.; Mori, H.; Nishimoto, K.; Klueh, R.L.; Sokolov, M.A.; Stoller, R.E.; Zinkle, S.J.

    2008-01-01

    Reduced activation ferritic/martensitic steels (RAFMs) are recognized as the primary candidate structural materials for fusion blanket systems. The RAFM F82H was developed in Japan with emphasis on high-temperature properties and weldability. Extensive irradiation studies have conducted on F82H, and it has the most extensive available database of irradiated and unirradiated properties of all RAFMs. The objective of this paper is to review the R and D status of F82H and to identify the key technical issues for the fabrication of an ITER test blanket module (TBM) suggested from the recent research achievements in Japan. This work clarified that the primary issues with F82H involve welding techniques and the mechanical properties of weld joints. This is the result of the distinctive nature of the joint caused by the phase transformation that occurs in the weld joint during cooling, and its impact on the design of a TBM will be discussed

  17. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  18. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  19. Human factors: A major issue in plant aging

    International Nuclear Information System (INIS)

    Widrig, R.D.

    1985-01-01

    Humans play a significant role in the effects of aging on safe and reliable operation of nuclear power plants. These human issues may be more important than the issues of materials and component degradation with age. Human actions can accelerate or decelerate physical aging of a plant. And an aging plant can have a significant negative impact on staff quality and performance. The purpose of this paper is to provide some insights into the nature of these human factors issues and their relationship to plant aging. An early awareness of these issues facilitates timely action to at least mitigate these problems before they become insurmountable

  20. Technical Issues Associated With the Use of Intermediate Ethanol Blends (>E10) in the U.S. Legacy Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Rich, Bechtold [Alliance Technical Services; Thomas, John F [ORNL; Huff, Shean P [ORNL; Szybist, James P [ORNL; West, Brian H [ORNL; Theiss, Timothy J [ORNL; Timbario, Tom [Alliance Technical Services; Goodman, Marc [Alliance Technical Services

    2007-08-01

    The Oak Ridge National Laboratory (ORNL) supports the U.S. Department of Energy (DOE) in assessing the impact of using intermediate ethanol blends (E10 to E30) in the legacy fleet of vehicles in the U.S. fleet. The purpose of this report is to: (1) identify the issues associated with intermediate ethanol blends with an emphasis on the end-use or vehicle impacts of increased ethanol levels; (2) assess the likely severity of the issues and whether they will become more severe with higher ethanol blend levels, or identify where the issue is most severe; (3) identify where gaps in knowledge exist and what might be required to fill those knowledge gaps; and (4) compile a current and complete bibliography of key references on intermediate ethanol blends. This effort is chiefly a critical review and assessment of available studies. Subject matter experts (authors and selected expert contacts) were consulted to help with interpretation and assessment. The scope of this report is limited to technical issues. Additional issues associated with consumer, vehicle manufacturer, and regulatory acceptance of ethanol blends greater than E10 are not considered. The key findings from this study are given.

  1. Technical evaluation of major candidate blanket systems for fusion power reactor

    International Nuclear Information System (INIS)

    Tone, Tatsuzo; Seki, Masahiro; Minato, Akio

    1987-03-01

    The key functions required for tritium breeding blankets for a fusion power reactor are: (1) self-sufficient tritium breeding, (2) in-situ tritium recovery and low tritium inventory, (3) high temperature cooling giving a high efficiency of electricity generation and (4) thermo-mechanical reliability and simplified remote maintenance to obtain high plant availability. Blanket performance is substantially governed by materials selection. Major options of structure/breeder/coolant/neutron multiplier materials considered for the present design study are PCA/Li 2 O/H 2 O/Be, Mo-alloy/Li 2 O/He/Be, Mo-alloy/LiAlO 2 /He/Be, V-alloy/Li/Li/none, and Mo-alloy/Li/He/none. In addition, remote maintenance of blankets, tritium recovery system, heat transport and energy conversion have been investigated. In this report, technological problems and critical R and D issues for power reactor blanket development are identified and a comparison of major candidate blanket concepts is discussed in terms of the present materials data base, economic performance, prospects for future improvements, and engineering feasibility and difficulties based on the results obtained from individual design studies. (author)

  2. {sup 18}F-FDG PET/CT quantification in head and neck squamous cell cancer: principles, technical issues and clinical applications

    Energy Technology Data Exchange (ETDEWEB)

    Manca, Gianpiero; Volterrani, Duccio [University Hospital of Pisa, Regional Center of Nuclear Medicine, Pisa (Italy); Vanzi, Eleonora [University Hospital of Siena, Service of Medical Physics, Siena (Italy); Rubello, Domenico; Grassetto, Gaia [Santa Maria della Misericordia Rovigo Hospital, Department of Nuclear Medicine, Rovigo (Italy); Giammarile, Francesco [Faculte Charles Merieux, Medecine Nucleaire, Centre Hospitalier and Biophysique, Lyon (France); Wong, Ka Kit [University of Michigan Hospital, Nuclear Medicine/Radiology Department, Ann Arbor, MI (United States); Nuclear Medicine Service, Department of Veterans Affairs Health System, Ann Arbor, MI (United States); Perkins, Alan C. [University of Nottingham, Department of Radiological Sciences, School of Medicine, Nottingham (United Kingdom); Colletti, Patrick M. [Southern University of California, Department of Radiology, Los Angeles, CA (United States)

    2016-07-15

    {sup 18}F-FDG PET/CT plays a crucial role in the diagnosis and management of patients with head and neck squamous cell cancer (HNSCC). The major clinical applications of this method include diagnosing an unknown primary tumour, identifying regional lymph node involvement and distant metastases, and providing prognostic information. {sup 18}F-FDG PET/CT is also used for precise delineation of the tumour volume for radiation therapy planning and dose painting, and for treatment response monitoring, by detecting residual or recurrent disease. Most of these applications would benefit from a quantitative approach to the disease, but the quantitative capability of {sup 18}F-FDG PET/CT is still underused in HNSCC. Innovations in PET/CT technology promise to overcome the issues that until now have hindered the employment of dynamic procedures in clinical practice and have limited ''quantification'' to the evaluation of standardized uptake values (SUV), de facto a semiquantitative parameter, the limits of which are well known to the nuclear medicine community. In this paper the principles of quantitative imaging and the related technical issues are reviewed so that professionals involved in HNSCC management can reflect on the advantages of ''true'' quantification. A discussion is then presented on how semiquantitative information is currently used in clinical {sup 18}F-FDG PET/CT applications in HNSCC, by discussing the improvements that could be obtained with more advanced and ''personalized'' quantification techniques. (orig.)

  3. Examining the Impact of Non-Technical Security Management Factors on Information Security Management in Health Informatics

    Science.gov (United States)

    Imam, Abbas H.

    2013-01-01

    Complexity of information security has become a major issue for organizations due to incessant threats to information assets. Healthcare organizations are particularly concerned with security owing to the inherent vulnerability of sensitive information assets in health informatics. While the non-technical security management elements have been at…

  4. Environmental Science and Research Foundation annual technical report: Calendar year 1996

    International Nuclear Information System (INIS)

    Morris, R.C.; Blew, R.D.

    1997-01-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation's mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed

  5. Environmental Science and Research Foundation annual technical report: Calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Morris, R.C.; Blew, R.D. [eds.

    1997-07-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed.

  6. Cultural Adaptations: Conceptual, Ethical, Contextual, and Methodological Issues for Working with Ethnocultural and Majority-World Populations.

    Science.gov (United States)

    Bernal, Guillermo; Adames, Cristina

    2017-08-01

    Mayor advancements have been achieved in research on the cultural adaptation of prevention and treatment interventions that are conducted with diverse ethnocultural groups. This commentary addresses conceptual, ethical, contextual, and methodological issues related to cultural adaptations. The articles in this special issue represent a major contribution to the study of cultural adaptations in prevention science. We frame our analysis of fidelity to core intervention components using a conceptual approach that examines (a) the propositional model (theory of change), (b) the procedural model (theory of action, methods), and (c) the philosophical assumptions that undergird these models. Regarding ethics, we caution against imposing the norms, values, and world views of the Western dominant society onto vulnerable populations such as ethnocultural groups. Given that the assumption of universality in behavioral science has been questioned, and as randomized clinical trials (RCTs) seldom examine the ecological validity of evidence-based interventions and treatments (EBI/T), imposing such interventions onto ethnocultural groups is problematic since these interventions contain values, norms, beliefs, and worldviews that may be contrary to those held by many ethnocultural groups. Regarding methods, several innovative designs are discussed that serve as alternatives to the RCT and represent an important contribution to prevention science. Also, we discuss guidelines for conducting cultural adaptations. Finally, the articles in this special issue make a major contribution to the growing field of cultural adaptation of preventive interventions with ethnocultural groups and majority-world populations.

  7. Containment Emergency Sump Performance. Technical findings related to Unresolved Safety Issue A-43. Revision 1

    International Nuclear Information System (INIS)

    1985-10-01

    This report summarizes key technical findings related to Unresolved Safety Issue (USI) A-43, Containment Emergency Sump Performance. Both BWRs and PWRs are considered in this report. Emergency core cooling systems require a clean, reliable water source to maintain long-term recirculation following a loss-of-coolant accident (LOCA). PWRs rely on the containment emergency sump to provide such a water supply to residual heat removal pumps and containment spray pumps. BWRs rely on pump suction intakes in the suppression pool or wet well to provide water to residual heat removal and core spray systems. Thus, the technical findings in this report provide information on post-LOCA recirculation. These findings have been derived from extensive experimental studies, generic plant studies, and assessments of sumps used for long-term cooling. Results of hydraulic tests have shown that the potential for air ingestion is less severe than previously hypothesized. The effects of debris blockage on NPSH margin must be dealt with on a plant-specific basis. These findings have been used to develop revisions to Regulatory Guide 1.82 and Standard Review Plan Section 6.2.2 (NUREG-0800)

  8. Technical and Vocational Education for Zimbabwe's Rural ...

    African Journals Online (AJOL)

    The main purpose of this paper is to highlight some issues and concerns in the Zimbabwean educational system in general, and in particular, issues and concerns within the purview for technical and vocational education. The paper will further provoke debate within the context of technical and vocational education as a ...

  9. Issues in Data Labelling

    NARCIS (Netherlands)

    Cowie, Roddy; Cox, Cate; Martin, Jeam-Claude; Batliner, Anton; Heylen, Dirk K.J.; Karpouzis, Kostas; Cowie, Roddy; Pelachaud, Catherine; Petta, Paolo

    2011-01-01

    Labelling emotion databases is not a purely technical matter. It is bound up with theoretical issues. Different issues affect labelling of emotional content, labelling of the signs that convey emotion, and labelling of the relevant context. Linked to these are representational issues, involving time

  10. The nuclear controversy-what are the issues

    International Nuclear Information System (INIS)

    Wyatt, A.

    1976-01-01

    The various issues raised by anti-nuclear groups are outlined and rebutted. Issues are grouped under four headingss - Economic; Technical; Social/Ethical/Moral; Political. Issues debated under economic aspects include conservation, unemployment resulting from energy use, use of alternative enrgy sources, high capital cost of nuclear power, high energy consumption in construction of plants, performance unreliability, depletion of uranium and excessive cost of decommissioning. Technically related issues, reactor safety, possibility of nuclear power plant explosion, waste managment, toxicity of plutonium, emission of radioactive material, thermal pollution and environmental effect of heavy water production are also discussed. Social/ethical/moral issues rebutted include radiation effects on health and genetic effects, deaths among uranium miners, morality of long-term waste storage, lack of faith in technical solutions and technical people, opposition to current life style, secrecy of information, nuclear proliferation and unsuitability of nuclear technology to the needs of developing countries. Political issues discussed are sabotage/terrorism possibilites, police state tactics in protection of nuclear facilities, misuse of technolgy by society, high energy society is capitalist and low energy society is Marxist, centralization of power, need for a great nuclear debate and the question of who pays for safety. Scientists and technical people are called upon to debate in their areas of specialty and are cautioned to be aware of tactics involved in meeting challengers head-on. (J.T.A.)

  11. CLOUD COMPUTING SECURITY ISSUES

    Directory of Open Access Journals (Sweden)

    Florin OGIGAU-NEAMTIU

    2012-01-01

    Full Text Available The term “cloud computing” has been in the spotlights of IT specialists the last years because of its potential to transform this industry. The promised benefits have determined companies to invest great sums of money in researching and developing this domain and great steps have been made towards implementing this technology. Managers have traditionally viewed IT as difficult and expensive and the promise of cloud computing leads many to think that IT will now be easy and cheap. The reality is that cloud computing has simplified some technical aspects of building computer systems, but the myriad challenges facing IT environment still remain. Organizations which consider adopting cloud based services must also understand the many major problems of information policy, including issues of privacy, security, reliability, access, and regulation. The goal of this article is to identify the main security issues and to draw the attention of both decision makers and users to the potential risks of moving data into “the cloud”.

  12. Predictors of employer satisfaction: technical and non-technical skills.

    Science.gov (United States)

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  13. The Use of Ascorbic Acid as a Food Additive: Technical-Legal Issues

    Science.gov (United States)

    Varvara, Michele; Bozzo, Giancarlo; Celano, Giuseppe; Disanto, Chiara; Pagliarone, Cosimo Nicola

    2016-01-01

    Ascorbic acid (C6H8O6) is an organic compound belonging to the family of monosaccharide. It is highly soluble in water, and is often called one of the secrets of the Mediterranean diet. Its use is widespread in the food industry is also important, having always been exploited for its antioxidant and stabilising ability. Many indeed are the additive formulations that take advantage of these properties. The purpose of this paper is to explain the characteristics that make ascorbic acid an important food additive and to emphasise the technical and legal issues related to its use in food productions. In particular, in the course of this employment, laws and scientific studies have been applied to the resolution of a lawsuit, having as its object the use of ascorbic acid in preparations of ground beef sold at a butcher shop. The views expressed in court by the technical consultant have led to the acquittal of the accused, in the light of the demonstrated and proven non-toxicity of the molecule and the use of a mixture of additives for the production of sausage. The European and national legislations, supported by numerous scientific studies, define the possible use of ascorbic acid according to the principle of quantum satis, and it can be used in foods for children. Our work aims to represent further evidence of the safety of use of ascorbic acid as a food additive, and – as confirmed by the legal decision reported – it wants to bring out the prospects for use of ascorbic acid for technological purposes even by registered establishments. PMID:27800425

  14. Technical and Vocational Education in Nigeria: Issues, Challenges and a Way Forward

    Science.gov (United States)

    Okoye, Reko; Arimonu, Maxwell Onyenwe

    2016-01-01

    Technical education, as enshrined in the Nigerian national policy on education, is concerned with qualitative technological human resources development directed towards a national pool of skilled and self reliant craftsmen, technicians and technologists in technical and vocational education fields. In Nigeria, the training of technical personnel…

  15. Towards technical interoperability in telemedicine.

    Energy Technology Data Exchange (ETDEWEB)

    Craft, Richard Layne, II

    2004-05-01

    For telemedicine to realize the vision of anywhere, anytime access to care, the question of how to create a fully interoperable technical infrastructure must be addressed. After briefly discussing how 'technical interoperability' compares with other types of interoperability being addressed in the telemedicine community today, this paper describes reasons for pursuing technical interoperability, presents a proposed framework for realizing technical interoperability, identifies key issues that will need to be addressed if technical interoperability is to be achieved, and suggests a course of action that the telemedicine community might follow to accomplish this goal.

  16. Residual life assessment of major LWR components: NPAR approach and results

    International Nuclear Information System (INIS)

    Shah, V.N.; Weidenhamer, G.H.; Vora, J.P.

    1991-01-01

    The nuclear plant aging research (NPAR) program is systematically addressing the technical issues associated with understanding and managing aging of major LWR components. Twenty-one major components have been identified and prioritized according to their relevance to plant safety. Qualitative aging assessment has identified pertinent design features, materials, stressors, environments, aging mechanisms. and failure modes for each of the components. Emerging inspection, surveillance, and monitoring methods to characterize aging damage and mitigation methods to reduce the damage are currently being assessed. The results of all these assessments are used to develop life-assessment procedures for the components and are included in appropriate documents supporting the regulatory requirements for license renewal. (author)

  17. The Kozloduy absurdity: Legal and political dimensions of the Bulgarian Nuclear Power Plant issue

    International Nuclear Information System (INIS)

    Semov, A.

    2006-01-01

    The issue of Kozloduy NPP is long-standing and sensitive. Complicated technical, legal, economical, political and purely ethical issues are involved in it. Their entire review in this brief presentation is impossible. The paper therefore only dwells on some of the major issues, the way they have been presented by the Civil Committee for Kozloduy NPP Defence. Following an outline of the way the situation developed, the paper discusses legally binding acts and then considers other legally relevant factors. The possible existence of a friendly political climate in Europe allowing reconsideration of the matter is also dealt with. (author)

  18. Experts' perspective on the performance of Chinese technical guidelines for Plan Environmental Impact Assessment

    International Nuclear Information System (INIS)

    He Jia; Sun Sun; Bao Cunkuan; Chen Fan; Jiang Dahe

    2011-01-01

    This research was to evaluate the Technical Guideline (HJ/T130-2003) effectiveness based on data resource from a questionnaire survey and interviews on EIA experts. The result demonstrated that the guideline served mainly as a quality control measure for PEIA products, and only a small proportion of experts considered it effective due to its inconsistency with the newly released Chinese PEIA Regulation (2009) and poor practicability. Current status of SEA implementation in China was also studied in terms of application fields, effectiveness evaluation, and major issues to affect SEA, to conclude that SEA implementation in China is premature, and with limited effectiveness. The major problem was the lack of effective methodologies and technical tools. Recommendations for revising the PEIA Guideline and advices to improving SEA implementation in China were accordingly proposed.

  19. Technical Elements (CCT1)

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    2017-01-01

    Many of the aspects dealt with in the CA EPBD are closely interlinked with each other and may refer to both new and existing buildings, as well as to inspection and certification. This is also true for technical aspects, such as the calculation methodologies, and how to include technical systems......’ efficiency or how to integrate renewable energy within them. The central team for Technical Elements deals with issues of a technical nature, which are common to new and existing buildings, and/or with minimum demands, certification and inspection. This report focuses on the implementation of Articles 3, 4...

  20. Three technical issues in fatigue damage assessment of nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Shah, V.N.

    1991-01-01

    This paper addresses three technical issues that affect the fatigue damage assessment of nuclear power plant components: the effect of the environment on the fatigue life, the importance of the loading sequence in calculating the fatigue crack-initiation damage, and the adequacy of current inservice inspection requirements and methods to characterize fatigue cracks. The environmental parameters that affect the fatigue life of carbon and low alloy steel components are the sulphur content in the steel, the temperature, the amount of dissolved oxygen in the coolant, and the presence of oxidizing agents such as copper oxide. The occurrence of large-amplitude stress cycles early in a component's life followed by low-amplitude stress cycles may cause crack initiation at a cumulative usage factor less than 1.0. The current inservice inspection requirements include volumetric inspections of welds but not of some susceptible sites in the base metal. In addition, the conventional ultrasonic testing techniques need to be improved for reliable detection and accurate sizing of fatigue cracks. 28 refs., 4 figs., 1 tab

  1. Is evolutionary psychology a metatheory for psychology? A discussion of four major issues in psychology from an evolutionary developmental perspective

    NARCIS (Netherlands)

    Ploeger, A.; van der Maas, H.L.J.; Raijmakers, M.E.J.

    2008-01-01

    Evolutionary psychology has been proposed as a metatheoretical framework for psychology. We argue that evolutionary psychology should be expanded if it is to offer new insights regarding the major issues in psychology. Evolutionary developmental biology can provide valuable new insights into issues

  2. High-speed civil transport issues and technology program

    Science.gov (United States)

    Hewett, Marle D.

    1992-01-01

    A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.

  3. Knowledge based systems: A critical survey of major concepts, issues and techniques. Visuals

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu

    1984-01-01

    This Working Paper Series entry represents a collection of presentation visuals associated with the companion report entitled, Knowledge Based Systems: A Critical Survey of Major Concepts, Issues, and Techniques, USL/DBMS NASA/RECON Working Paper Series report number DBMS.NASA/RECON-9. The objectives of the report are to: examine various techniques used to build the KBS; to examine at least one KBS in detail, i.e., a case study; to list and identify limitations and problems with the KBS; to suggest future areas of research; and to provide extensive reference materials.

  4. Research and Development Issues for Interactive Electronic Technical Manuals

    National Research Council Canada - National Science Library

    Ricci, Katrina

    2002-01-01

    ... technologies to support Interactive Electronic Technical Manuals (IETMs). A workshop was conducted at the NAVAIR Orlando, Training Systems Division to discuss the domain and to present current research in this area...

  5. Regulatory and technical reports, compilation for 1979. Volume 4. Bibliographical report Jan-Dec 79

    International Nuclear Information System (INIS)

    Oliu, W.E.; McKenzie, L.; Aragon, R.

    1980-07-01

    The compilation lists formal regulatory and technical reports issued in 1979 by the U.S. Nuclear Regulatory Commission (NRC) staff and by NRC contractors. The compilation is divided into three major sections. The first major section consists of a sequential listing of all NRC reports in report-number order. The first portion of this sequential section lists staff reports, the second portion lists NRC-sponsored conference proceedings, and the third lists contractor reports. Each report citation in the sequential section contains full bibliographic information

  6. Control of heavy loads at nuclear power plants: Resolution of Generic Technical Activity A-36. Technical report

    International Nuclear Information System (INIS)

    George, H.J.

    1980-07-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-36, Control of Heavy Loads Near Spent Fuel. Generic Technical Activity A-36 is one of the generic technical subjects designated as unresolved safety issues pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical studies and evaluations performed by the NRC staff, the staff's guidelines based on these studies, and the staff's plans for implementaton of its technical guidelines

  7. The IMO Technical Panel, its role and its stakeholdering process

    International Nuclear Information System (INIS)

    Cary, R.

    1999-01-01

    Some insight is provided for IPPSO members into the IMO Technical Panel (TP), its scope, modus operandi, and stakeholdering process. The TP is one of 3 panels recommended by the MDC and defined in the IMP bylaws. Its role is to consider rule changes and make recommendations to the IMO board. The aims of the Technical Panel are listed. The priority issues with significant direct impact on generators are: import and export transmission, including access to the inter-ties, and the Financial Transmission Rights associated with inter-ties, procedures governing new investment in transmission, participation and prudential requirements, and residual risk location, facility aggregation rules, local market power migration, must-run contracts; principles and forms of agreement, penalties for non-compliance with rules, and transitional provisions around market opening. The excluded major market design principles to be resolved by others are covered, as well as how it is decided what issues need attention. The TP does its work by: work planning, policy consultation, rule guidance and direction requests, and proposed rule amendments. Further points are listed concerning: how the TP secures stakeholder input, how the IPPSO stakeholder consultation process works, import and export transmission issues, and accreditation and prudential requirements

  8. Use Of Renewable Energy In The Electric Power Generation Sector In Mexico: Political, Regulatory, Economic And Technical Issues From 1965 To 2018

    Energy Technology Data Exchange (ETDEWEB)

    Elizalde-Baltierra, Alberto; Sasse, Diana; Zeferino-Abundis, Yolanda; Quiroz-Juarez, Carolina; Lopez-Satow, Edgar; Beltran-Mora, Hector; Crisostomo-Ramirez, David

    2010-09-15

    The aim of this work is to analyze the political, regulatory, economic and technical issues that have determined the use of primary energies for power generation in Mexico from 1965 to 2008, and its perspectives for the next 10 years, in particular the prospects of using renewable energies. In the 60's, hydro was the preferred source of energy to produce electricity for economical and technical reasons. Under the 'oil boom' in the 70s, transition to hydrocarbons resources (fuel oil) was progressive. As a result of implementing environmental policies, electricity has mainly been generated with natural gas since the early 2000.

  9. Regulatory issues for nuclear power plant life management

    International Nuclear Information System (INIS)

    Roe, J.

    2000-01-01

    The workshop of 26-27 june 2000, on nuclear power Plant LIfe Management (PLIM), also included working groups in which major issues facing PLIM activities for nuclear power plants were identified and discussed. The second group was on Regulation. The Regulatory Working Group will attempt to identify some of the more pertinent issues affecting nuclear plant regulation in a changing PLIM environment, to identify some possible actions to be taken to address these issues, and to identify some of the parties responsible for taking these actions. Some preliminary regulatory issues are noted below. This is not intended to be a comprehensive list of such issues but rather is intended to stimulate discussion among the experts attending this Workshop. One of the concerns in the regulatory arena is how the structural integrity of the plants can be assured for an extended lifetime. Technological advances directed toward the following are likely to be important factors in the regulatory process of life extension. - Preventive and corrective maintenance (e.g., water chemistry control, pressure vessel annealing, and replacement of core internals). - Ageing and degradation mechanisms and evaluation (e.g., embrittlement, wear, corrosion/erosion, fatigue, and stress corrosion). - Monitoring, surveillance, and inspection (e.g., fatigue monitoring and non-destructive testing). - Optimisation of maintenance (e.g., using risk-based analysis). On the business side, there is concern about technical support by manufacturers, fuel companies, and construction companies. Maintaining a strong technical base and skilled workers in a potentially declining environment is another concern in the regulatory community. Waste management and decommissioning remain significant issue regarding PLIM. These issues affect all three areas of concern - technology, business, and regulation. It is against this background, that the issues put forth in this paper are presented. The objective of presenting these

  10. The socio-technical system and nuclear safety

    International Nuclear Information System (INIS)

    Stefanescu, Petre; Mihailescu, Nicolae; Dragusin, Octavian

    1999-01-01

    In the field of nuclear safety there have been defined notions like 'technical factors' and 'human factors'. The technical factors depend on designing and manufacturing of components/equipment, actually depend on the people's work. The study of human factors consists in analyzing and recommending the terms that allow an individual to be a reliable and safety agent. Accordingly, he/she is placed in working conditions corresponding to human abilities, associating the means of three levels: - designing, i.e. the action upon the technical system and upon work organization; - correction, i.e. the action upon the evolution of the technical system and organizing; - formation/training, i.e. action upon operators. The paper presents a characterization of the socio-technical system and on this basis discusses the issue of individual adjustment to the socio-technical system and reciprocally, the issue of the socio-technical system adjustment to the individual. Concepts as: ergonomics, physical medium, man/machine interface and support of the operator, man/machine task sharing, the work organizing are put in relation with the central subject, the nuclear safety

  11. 48 CFR 952.242-70 - Technical direction.

    Science.gov (United States)

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  12. 48 CFR 1552.237-71 - Technical direction.

    Science.gov (United States)

    2010-10-01

    .... (d) Technical direction will be issued in writing or confirmed in writing within five (5) days after... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical direction. 1552... Technical direction. As prescribed in 1537.110, insert a clause substantially the same as the following...

  13. CTBT technical issues handbook

    International Nuclear Information System (INIS)

    Zucca, J.J.

    1994-05-01

    The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments

  14. 48 CFR 2452.237-73 - Conduct of Work and Technical Guidance.

    Science.gov (United States)

    2010-10-01

    ... conditions of the contract. (c) The GTR will issue technical guidance in writing or, if issued orally, he/she... Technical Guidance. 2452.237-73 Section 2452.237-73 Federal Acquisition Regulations System DEPARTMENT OF... Provisions and Clauses 2452.237-73 Conduct of Work and Technical Guidance. As prescribed in 2437.110(d...

  15. Language issues, an underestimated danger in major hazard control?

    Science.gov (United States)

    Lindhout, Paul; Ale, Ben J M

    2009-12-15

    Language issues are problems with communication via speech, signs, gestures or their written equivalents. They may result from poor reading and writing skills, a mix of foreign languages and other circumstances. Language issues are not picked up as a safety risk on the shop floor by current safety management systems. These safety risks need to be identified, acknowledged, quantified and prioritized in order to allow risk reducing measures to be taken. This study investigates the nature of language issues related danger in literature, by experiment and by a survey among the Seveso II companies in the Netherlands. Based on human error frequencies, and on the contents of accident investigation reports, the risks associated with language issues were ranked. Accident investigation method causal factor categories were found not to be sufficiently representative for the type and magnitude of these risks. Readability of safety related documents used by the companies was investigated and found to be poor in many cases. Interviews among regulators and a survey among Seveso II companies were used to identify the gap between the language issue related dangers found in literature and current best practices. This study demonstrates by means of triangulation with different investigative methods that language issue related risks are indeed underestimated. A recommended coarse of action in order to arrive at appropriate measures is presented.

  16. Language issues, an underestimated danger in major hazard control?

    Energy Technology Data Exchange (ETDEWEB)

    Lindhout, Paul, E-mail: plindhout@minszw.nl [Ministry of Social Affairs and Employment, AI-MHC, Anna van Hannoverstraat 4, P.O. Box 90801, 2509 LV The Hague (Netherlands); Ale, Ben J.M. [Delft University of Technology, TBM-Safety Science Group, Jaffalaan 5, 2628 BX Delft (Netherlands)

    2009-12-15

    Language issues are problems with communication via speech, signs, gestures or their written equivalents. They may result from poor reading and writing skills, a mix of foreign languages and other circumstances. Language issues are not picked up as a safety risk on the shop floor by current safety management systems. These safety risks need to be identified, acknowledged, quantified and prioritised in order to allow risk reducing measures to be taken. This study investigates the nature of language issues related danger in literature, by experiment and by a survey among the Seveso II companies in the Netherlands. Based on human error frequencies, and on the contents of accident investigation reports, the risks associated with language issues were ranked. Accident investigation method causal factor categories were found not to be sufficiently representative for the type and magnitude of these risks. Readability of safety related documents used by the companies was investigated and found to be poor in many cases. Interviews among regulators and a survey among Seveso II companies were used to identify the gap between the language issue related dangers found in literature and current best practices. This study demonstrates by means of triangulation with different investigative methods that language issue related risks are indeed underestimated. A recommended coarse of action in order to arrive at appropriate measures is presented.

  17. Language issues, an underestimated danger in major hazard control?

    International Nuclear Information System (INIS)

    Lindhout, Paul; Ale, Ben J.M.

    2009-01-01

    Language issues are problems with communication via speech, signs, gestures or their written equivalents. They may result from poor reading and writing skills, a mix of foreign languages and other circumstances. Language issues are not picked up as a safety risk on the shop floor by current safety management systems. These safety risks need to be identified, acknowledged, quantified and prioritised in order to allow risk reducing measures to be taken. This study investigates the nature of language issues related danger in literature, by experiment and by a survey among the Seveso II companies in the Netherlands. Based on human error frequencies, and on the contents of accident investigation reports, the risks associated with language issues were ranked. Accident investigation method causal factor categories were found not to be sufficiently representative for the type and magnitude of these risks. Readability of safety related documents used by the companies was investigated and found to be poor in many cases. Interviews among regulators and a survey among Seveso II companies were used to identify the gap between the language issue related dangers found in literature and current best practices. This study demonstrates by means of triangulation with different investigative methods that language issue related risks are indeed underestimated. A recommended coarse of action in order to arrive at appropriate measures is presented.

  18. DOE technical standards list: Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    This Department of Energy (DOE) technical standards list (TSL) has been prepared by the Office of Nuclear Safety Policy and Standards (EH-31) on the basis of currently available technical information. Periodic updates of this TSL will be issued as additional information is received on standardization documents being issued, adopted, or canceled by DOE. This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listings of current DOE technical standards, non-Government standards that have been adopted by DOE, other standards-related documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  19. Study of tunnelling through water-bearing fracture zones. Baseline study on technical issues with NE-1 as reference

    International Nuclear Information System (INIS)

    Yanting Chang; Swindell, Robert; Bogdanoff, Ingvar; Lindstroem, Beatrice; Termen, Jens; Starsec, Peter

    2005-04-01

    , based on the review of the geological and hydrogeological characteristics of the deformation zone NE-1. In the descriptive model, the water-bearing fracture zone consists of an 8 metre wide central core zone and a 15 meter wide transition zone sited on either side of the core zone. Rock mechanical and hydrogeological properties of the rock mass as well as in situ rock stresses are assigned in the descriptive model. To highlight the important technical issues in tunnelling through water-bearing fracture zones, system analysis and problem identification based on a literature review of relevant case histories are conducted. The identified important technical issues, namely large water inflow and tunnel stability, will be the objects to be analysed in this study. Control of water inflows is the key issue for the safe passage of a tunnel through a water-bearing fracture zone with the characteristics of NE-1. Technical issues associated with the two most used methods for water inflow control, namely grouting and ground freezing are discussed. The analyses regarding water inflows associated with grouting are presented. The degree of difficulty for water inflow control increases with depth. The study indicates that control of water inflows at all the depths could be achieved by grouting with current technology. But ground freezing might be an alternative for the core zone, for instance at a depth of 600 metres. Due to the high water pressure that may be encountered at a depth of 600 metres, precautions must be taken in the decision making process in selecting the most appropriate methods of groundwater control. The deformation analysis indicates that large deformations are unlikely to occur in the transition zone, even at a depth of 600 metres. The reduction in rock mass quality in the core zone, however, is likely to result in large deformations at great depths. The estimated mean values of deformation for an unsupported tunnel in the core zone are 60 mm and 130 mm at depths

  20. Study of tunnelling through water-bearing fracture zones. Baseline study on technical issues with NE-1 as reference

    Energy Technology Data Exchange (ETDEWEB)

    Yanting Chang; Swindell, Robert; Bogdanoff, Ingvar; Lindstroem, Beatrice; Termen, Jens [WSP Sweden, Stockholm (Sweden) ; Starsec, Peter [SGI, Linkoeping (Sweden)

    2005-04-01

    established, based on the review of the geological and hydrogeological characteristics of the deformation zone NE-1. In the descriptive model, the water-bearing fracture zone consists of an 8 metre wide central core zone and a 15 meter wide transition zone sited on either side of the core zone. Rock mechanical and hydrogeological properties of the rock mass as well as in situ rock stresses are assigned in the descriptive model. To highlight the important technical issues in tunnelling through water-bearing fracture zones, system analysis and problem identification based on a literature review of relevant case histories are conducted. The identified important technical issues, namely large water inflow and tunnel stability, will be the objects to be analysed in this study. Control of water inflows is the key issue for the safe passage of a tunnel through a water-bearing fracture zone with the characteristics of NE-1. Technical issues associated with the two most used methods for water inflow control, namely grouting and ground freezing are discussed. The analyses regarding water inflows associated with grouting are presented. The degree of difficulty for water inflow control increases with depth. The study indicates that control of water inflows at all the depths could be achieved by grouting with current technology. But ground freezing might be an alternative for the core zone, for instance at a depth of 600 metres. Due to the high water pressure that may be encountered at a depth of 600 metres, precautions must be taken in the decision making process in selecting the most appropriate methods of groundwater control. The deformation analysis indicates that large deformations are unlikely to occur in the transition zone, even at a depth of 600 metres. The reduction in rock mass quality in the core zone, however, is likely to result in large deformations at great depths. The estimated mean values of deformation for an unsupported tunnel in the core zone are 60 mm and 130 mm at

  1. Citation analysis of Computer Standards & Interfaces: Technical or also non-technical focus?

    NARCIS (Netherlands)

    G. van de Kaa (Geerten); H.J. de Vries (Henk); B. Baskaran (Balakumaran)

    2015-01-01

    textabstractThis paper analyzes to which extent research published in Computer Standards & Interfaces (CSI) has a technical focus. We find that CSI has been following its scope very closely in the last three years and that the majority of its publications have a technical focus. Articles published

  2. Overview of Major Issues of Tax Treaties Law in Kosovo

    Directory of Open Access Journals (Sweden)

    Bedri Peci

    2015-06-01

    Full Text Available The aim of this research is to analyze and find out the major issue of tax treaties law in Kosovo. In this analysis we have used the research method of case study. The results of research show that the legal framework for the elimination of double taxation, after 1999, initially started its establishment journey from the United Nations Administration Mission in Kosovo (UNMIK. Taking into consideration the specifications of the political status, the process for the establishment of the unilateral and bilateral legal framework has been made with mistakes, slow and with delays. Following its declaration of independence, Kosovo has paid greater attention to tax treaties. Although double taxation relief in Kosovo may be obtained either unilaterally or under a tax treaty, there remains a lot of work to be done for the completion of the necessary framework for elimination of double taxation. The double taxation relief provided by a tax treaty prevails over the domestic relief. The study is of particular relevance to scholars, tax practitioners, expatriates who work and invest in Kosovo, etc

  3. The Boston Study: Analysis of a Major Metropolitan Business- and Technical-Communication Market.

    Science.gov (United States)

    Buchholz, William J.

    1989-01-01

    Presents a year-long study of the duties, skills, and knowledge required of business- and technical-communication professionals in Boston, Massachusetts. Focuses on six categories of practice: technical communication, publishing, public relations, marketing, development, and training. Suggests that in the next decade communication practitioners…

  4. Works Technical Department progress report, March 1961

    Energy Technology Data Exchange (ETDEWEB)

    None

    1961-04-19

    This document details the activities of the Savannah River Works Technical Department during the month of March 1961. Topics discussed are: Reactor Technology, Separations Technology, Engineering Assistance, Health Physics, Laboratories Overview, and Technical Papers Issued.

  5. SLIM-MAUD: an approach to assessing human error probabilities using structured expert judgment. Volume II. Detailed analysis of the technical issues

    International Nuclear Information System (INIS)

    Embrey, D.E.; Humphreys, P.; Rosa, E.A.; Kirwan, B.; Rea, K.

    1984-07-01

    This two-volume report presents the procedures and analyses performed in developing an approach for structuring expert judgments to estimate human error probabilities. Volume I presents an overview of work performed in developing the approach: SLIM-MAUD (Success Likelihood Index Methodology, implemented through the use of an interactive computer program called MAUD-Multi-Attribute Utility Decomposition). Volume II provides a more detailed analysis of the technical issues underlying the approach

  6. Public Communication of Technical Issues in Today's Changing Visual Language - 12436

    Energy Technology Data Exchange (ETDEWEB)

    Hermann, Laura [Potomac Communications Group (United States)

    2012-07-01

    Communication regarding the management of radioactive materials is a well-established challenge. Residents and consumers have suspected for years that companies and governments place short-term economic concerns ahead of health and safety. This skepticism is compounded with increased attention to safety issues at nuclear power plants everywhere after Fukushima. Nonetheless, today's environment presents unexpected opportunities to transform public fear into teachable moments that bring knowledge and facts to discussions on nuclear energy. In the weeks following Japan's crisis, the lack of reliable information on radiation levels saw citizens taking to the streets with dosimeters and Geiger counters in crowd-sourced radiation monitoring efforts. Efforts, based mainly online, represent a growing set of examples of how internet and cell-phone technology are being put to use in emergency situations. The maps, graphs and tables created to meet public interest also exemplify some of the psychological priorities of audiences and present learning tools that can improve future education efforts in non-emergency situations. Industry outreach efforts often consist of technical details and quantitative data that are difficult for lay audiences to interpret. The intense attention to nuclear energy issues since last March has produced a wide array of visual samples. Citizen monitors, news organizations, government agencies and others have displayed quantitative information in innovative ways. Their efforts offer new perspective on what charts, maps and info graphics do - or need to do - to illustrate requirements, record assessments and promote understanding of nuclear-waste issues. Surveying the best examples, nuclear communicators can improve their offerings of easy-to-use, evidence-based visuals to inform stakeholders. Familiar to most communications professionals in the nuclear industry, risk communication is a science-based approach with over three decades of

  7. Special issue containing papers presented at the 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems (7-11 September 2011) Special issue containing papers presented at the 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems (7-11 September 2011)

    Science.gov (United States)

    Berk, H. L.

    2012-09-01

    addition, a significant number of studies focused on understanding nonlinear behaviour by means of computer simulation of energetic particle driven instability. An under-represented area of investigation was the study of electron runaway formation during major tokamak disruptions. It was noted in an overview by S. Putvinski that electron energies in the 10-20 MeV range is to be expected during projected major disruptions in ITER and that reliable methods for mitigation of the runaway process needs to be developed. Significant recent work in the field of the disruption induced electron runaway, which was reported by J. Riemann, does not appear in this special issue of Nuclear Fusion as the work had been previously submitted to Physics of Plasmas [3]. Overall it is clear that reliable mitigation of electron runaway is an extremely important topic that is in need of better understanding and solutions. It has been my pleasure to serve as the organizer of the 12th meeting and to serve as a Guest Editor of this issue of Nuclear Fusion. I am sure that the contents of this issue will serve as a valuable research guide to the field of energetic particle behaviour in a burning plasma for many years to come. The site of the next meeting will by Beijing, China in the fall of 2013, which will be organized by Zinghong Lin. References [1] Program 2011 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems (Austin, Texas, USA, 7-11 September 2011) http://w3fusion.ph.utexas.edu/ifs/iaeaep/program.html [2] Program 2011 5th IAEA Technical Meeting on Theory of Plasma Wave Instabilities (Austin, Texas, USA, 5-7 September 2011) http://w3fusion.ph.utexas.edu/ifs/iaeapi/program.html [3] Riemann J., Smith H.M. and Helander P. 2012 Phys. Plasmas 19 012507

  8. Technical issues of RAFMs for the fabrication of ITER Test Blanket Module

    International Nuclear Information System (INIS)

    Tanigawa, Hiroyasu; Hirose, Takanori; Shiba, Kiyoyuki

    2007-01-01

    Reduced activation ferritic/martensitic steels (RAFMs) are recognized as the primary candidate structural materials for fusion blanket systems, as it has they have been developed based on massive industrial experience of ferritic/martensitic steel replacing Mo and Nb of high chromium heat resistant martensitic steels (such as modified 9Cr-1Mo) with W and Ta, respectively. F82H and JLF-1 are RAFMs, which have been developed and studied in Japan and the various effects of irradiation were reported. F82H is designed with emphasis on high temperature property and weldability, and was provided and evaluated in various countries as a part of the IEA fusion materials development collaboration. The JAEA/US collaboration program also has been conducted with the emphasis on irradiation effects of F82H. Now, among the existing database for RAFMs the most extensive one is that for F82H. The objective of this paper is to review the R and D status of F82H and to identify the key technical issues for the fabrication of ITER Test Blanket Module (TBM) suggested from the recent achievements in Japan. It is desirable to make the status of RAFMs equivalent to commercial steels to use RAFMs as the ITER-TBM structural material. This would require demonstrating the reproducibility and weldability as well as providing the database. The excellent reproducibility of F82H has been demonstrated with four 5-ton-heats, and two of them were provided as F82H-IEA heats. It has been also proved that F82H could be provided as plates (thickness of 1.5 to 55 mm), pipes and rectangular tubes. It is also important to have the excellent weldability as the TBM has about 300m length of weld line, and it was proved through TIG, EB and YAG weld test performed in air atmosphere. Various mechanical and microstructural data have been accumulated including long-term tests such as creep rupture tests and aging tests. Although F82H is a well-perceived RAFM as the ITER-TBM structural material, some issues are

  9. The technical supervision interface

    CERN Document Server

    Sollander, P

    1998-01-01

    The Technical Control Room (TCR) is currently using 30 different applications for the remote supervision of the technical infrastructure at CERN. These applications have all been developed with the CERN made Uniform Man Machine Interface (UMMI) tools built in 1990. However, the visualization technology has evolved phenomenally since 1990, the Technical Data Server (TDS) has radically changed our control system architecture, and the standardization and the maintenance of the UMMI applications have become important issues as their number increases. The Technical Supervision Interface is intended to replace the UMMI and solve the above problems. Using a standard WWW-browser for the display, it will be inherently multi-platform and hence available for control room operators, equipment specialists and on-call personnel.

  10. Branch technical position for performance assessment of low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Campbell, A.C.; Abramson, L.; Byrne, R.M.

    1994-01-01

    The U.S. Nuclear Regulatory Commission has developed a Draft Branch Technical Position on Performance Assessment of Low-Level Radioactive Waste Disposal Facilities. The draft technical position addresses important issues in performance assessment modeling and provides a framework and technical basis for conducting and evaluating performance assessments in a disposal facility license application. The technical position also addresses specific technical policy issues and augments existing NRC guidance pertaining to LLW performance assessment

  11. Mechanism analysis on nuclear technical relocation of the major countries

    International Nuclear Information System (INIS)

    1985-12-01

    This report is about cooperation method of nuclear energy among the USA, France and Canada. So it deals with building a cooperative system on nuclear technical relocation, researching a foreign policy on nuclear energy of the USA and cooperation method and cooperation trend of Japan, Canada, Russia, China and West Germany.

  12. Kentucky Career and Technical Teacher Education Programs/Ongoing Issues

    Science.gov (United States)

    Workman, Ed; Stubbs, Joyce

    2012-01-01

    What is Career and Technical Education (CTE)? How does one identify and recognized strong CTE educational programs? And after one has answers to the first two questions, how does one successfully align CTE teacher education (CTTE) programs across large institutions such as colleges within universities, or in Kentucky's endeavor within universities…

  13. Procedures for evaluating technical specifications (PETS)

    International Nuclear Information System (INIS)

    Samanta, P.K.; Boccio, J.L.; Vesely, W.E.

    1987-01-01

    In this paper, aspects of technical specifications relating to Generic Issues B-56 and B-61 are discussed from a risk-standpoint. These primarily deal with the risk issues associated with (1) adaptive diesel test requirements/surveillance test intervals, and (2) the effectiveness of cumulative outage time requirements for controlling downtime risk. Risk and reliability approaches are presented which (1) allow risk-acceptable test intervals to be determined for any diesel and (2) show the potential risk-control capability of prescribed allowed cumulative outage times. This work was conducted through NRC's Procedures for Evaluating Technical Specifications (PETS) Program. The overall objective of this program is to develop and demonstrate methodologies that utilize risk insights and reliability techniques for evaluating the scope, detailed requirements, and safety impact of plant technical specifications

  14. Presentation of the G-24 technical working group on training

    International Nuclear Information System (INIS)

    Haber, S.

    1993-01-01

    The Technical Working Group on Training (TWG-T) was created during the Plenary Session of September 1992 in order to inform the Members on ongoing activities in the Nuclear Training field, define redundancies and gaps of the ''Assistance Programs'', and propose efficient ways to progress. Training was recognized as one major activity through which operational safety can be very effectively and quite quickly improved and therefore the Plenary Session unanimously decided to launch a TWG on the subject. The present report is issued one year after the creation of the TWG. It summarizes the major steps of the activities and presents the relevant results. It also contains copies of documents on training infrastructures and requirements, provided by the recipient countries during the course of the work

  15. Human factors: a major issue in plant aging

    International Nuclear Information System (INIS)

    Widrig, R.D.

    1985-07-01

    Human factors issues will be of great significance in the safe and reliable operation of aging nuclear power plants, and they may be more important than materials/component-type issues. Human actions can accelerate or decelerate te physical aging process. And an aging plant can have significant negative implications on staff performance and actions. Some examples include difficulties in attracting and retaining good managers, financial decisions based on a short and uncertain remaining plant life, difficulties in replacing retiring staff, increased maintenance complexity, and increased burden on training. These problems can be dealt with more effectively by early recognition and a well conceived mitigation effort

  16. Evaluation on safety issues of SMART

    International Nuclear Information System (INIS)

    Kim, W. S.; Seol, K. W.; Yoon, Y. K.; Lee, J. H.

    2001-01-01

    Safety issues on the SMART were evaluated in the light of the compliance with the Ministerial Ordinance of Technical Requirements applying to Nuclear Installations, which was recently revised. Evaluation concludes that regulatory requirements associated with following items have to be developed as the licensing criteria for the SMART: (1) proving the safety of design or materials different form existing reactors; (2) coping with beyond design basis accidents; (3) rulemaking on the safety of reactor safeguard vessel ; (4) ensuring integrity of steam generator tubes; and (5) classifying equipment based on their safety significance. Appropriate actions including implementation of new requirements under development should be taken for safety issues such as diversity of reactivity control and in-service inspection of steam generator tubes that are not complied with the current Technical Requirements. Safety level of the SMART design will be evaluated further by the more detailed assessment according to the Technical Requirements, and additional safety issues will be identified and resolved, if it necessary

  17. Space reactor fuels performance and development issues

    International Nuclear Information System (INIS)

    Wewerka, E.M.

    1984-01-01

    Three compact reactor concepts are now under consideration by the US Space Nuclear Power Program (the SP-100 Program) as candidates for the first 100-kWe-class space reactor. Each of these reactor designs puts unique constraints and requirements on the fuels system, and raises issues of fuel systems feasibility and performance. This paper presents a brief overview of the fuel requirements for the proposed space reactor designs, a delineation of the technical feasibility issues that each raises, and a description of the fuel systems development and testing program that has been established to address key technical issues

  18. State-of-art report on digital I and C system reliability issues for nuclear power plants

    International Nuclear Information System (INIS)

    Hwang, In Koo; Lee, Dong Gyoung; Cha, Kyung Ho; Kwon, Kee Choon; Wood, Richard T.

    2000-01-01

    As the instrumentation and control (Iand C) equipment suppliers tend to provide digital components rather than conventional analog type components for instrument and control systems of nuclear power plants(NPPs), it is unavoidable to adopt digital equipment for safety I and C systems as well as non-safety systems. However, the full introduction of digital equipment to I and C systems of nuclear power plants raises several concerns which have not been considered for conventional analog I and C systems. The two major examples of the issues of digital systems are electromagnetic compatibility (EMC) and software reliability. KAERI invited a technical expert, Dr. Richard T. Wood, from Oak Ridge National Laboratory (ORNL) in Unites States and held seminars to recognize the state-of-art of the above issues and to share the information on techniques dealing with the problems. Dr. Wood has been working on the development of EMC guidelines and technical basis in using digital equipment for safety systems in nuclear power plants on the sponsorship of US Nuclear Regulatory Commission (NRC). Being based on his statements and discussions during his visit, this report describes technical considerations and issues on digital safety I and C system application in NPPs, EMC methods, environmental effects vulnerable to digital components, reliability assurance methods, etc. (author)

  19. Sustainable network of independent technical expertise for radioactive waste disposal

    International Nuclear Information System (INIS)

    Serres, Christophe; Rocher, Muriel; Lemy, Frank; Havlova, Vaclava; Mrskova, Adela; Heriard Dubreuil, Gilles

    2014-01-01

    Full text of publication follows: SITEX is a 24-month FP7 project led by IRSN and bringing together 15 organisations representing technical safety organisations (TSO) and safety authorities, as well as civil society outreach specialists involved in the 'regulatory' review process of geological disposal of radioactive waste. SITEX aims at establishing the conditions required for developing a sustainable network of experts from various horizons (authorities, TSO, academic organisations, civil society,...) capable of developing and coordinating the technical expertise that is required from the stakeholders in charge of delivering opinion, independently from the waste management organisations (WMO), on the safety of geological disposals. The SITEX programme of work is split into a set of six work packages that address technical and organisational issues allowing to propose a structure of the missions and operating mode of the future network. These issues relate on the one hand to the study of the potential for sharing and developing technical expertise practices amongst stakeholders, on the other hand on the ability to implement co-ordinated R and D programmes run by TSO in order to develop the scientific knowledge necessary to perform independent technical assessments. Two major perspectives are identified for the future of the SITEX network: its ability to foster co-operation between regulatory bodies, TSO, implementers and civil society with a view to enhancing common understanding of key safety issues and challenges and to identifying possible harmonisation of practices; the constitution of a scientific task force (mainly driven by TSO) for research definition and implementation at the European level allowing to improve the co-ordination of scientific programmes between TSO and developing its own skills and analytical tools, independently of the WMO. A comprehensive list of safety issues relevant to the development and implementation of a geological repository has

  20. Socio-Technical Considerations for the Use of Blockchain Technology in Healthcare.

    Science.gov (United States)

    Wong, Ming Chao; Yee, Kwang Chien; Nøhr, Christian

    2018-01-01

    Blockchain technology is often considered as the fourth industrial revolution that will change the world. The enthusiasm of the transformative nature of blockchain technology has infiltrated healthcare. Blockchain is often seen as the much needed and perfect technology for healthcare, addressing the difficult and complex issues of security and inter-operability. More importantly, the "value" and trust-based system can deliver automated action and response via its smart contract mechanism. Healthcare, however, is a complex system. Health information technology (HIT) so far, has not delivered its promise of transforming healthcare due to its complex socio-technical and context sensitive interaction. The introduction of blockchain technology will need to consider a whole range of socio-technical issues in order to improve the quality and safety of patient care. This paper presents a discussion on these socio-technical issues. More importantly, this paper argues that in order to achieve the best outcome from blockchain technology, there is a need to consider a clinical transformation from "information" to "value " and trust. This paper argues that urgent research is needed to address these socio-technical issues in order to facilitate best outcomes for blockchain in healthcare. These socio-technical issues must then be further evaluated by means of working prototypes in the medical domain in coming years.

  1. Policy and technical issues for international safeguards in nuclear weapons states

    International Nuclear Information System (INIS)

    Markin, J.T.; Stanbro, W.D.

    1994-01-01

    Expansion of international safeguards into the military and commercial fuel cycles of the nuclear weapons states (NWS) -- the subject of previous proposals in international safeguards discussions and of studies in the safeguards literature -- has been given impetus by recent US government initiatives for safeguards on excess weapons materials and a verified fissile materials production cutoff. These proposals, if implemented, would have implications on the safeguards objectives, approaches, and technologies that are traditionally employed in international safeguards. This paper examines the modifications and innovations that might be required to the current international safeguards regime in meeting these proposed new roles. Although the examples given are in the context of the US materials and facilities, many of the conclusions are valid for other NWS. None of the statements in this paper represent official US position on policy for international safeguards in weapons states. Instead, the purpose is to identify policy and technical issues and to offer, where possible, options for their resolution. This paper limits consideration to the potential role of the IAEA in verifying these proposed initiatives for declared facilities, recognizing that there may also be a role for bilateral, multilateral, or regional verification regimes. Indeed, in some cases verification of weapons materials may be more appropriate for a bilateral arrangement. Because traditional IAEA safeguards may not be admissible for weapons materials, the concept of ''transparency'' is suggested as a less intrusive alternative providing some confidence that materials are as declared

  2. Standard technical specifications for Westinghouse pressurized water reactors (revision issued Fall 1981). Technical report

    International Nuclear Information System (INIS)

    Virgilio, M.J.

    1981-11-01

    The Standard Technical Specifications for Westinghouse Pressurized Water Reactors (W-STS) is a generic document prepared by the U.S. NRC for use in the licensing process of current Westinghouse Pressurized Water Reactors. The W-STS sets forth the Limits, Operating Conditions and other requirements applicable to nuclear reactor facility operation as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  3. Managing mixed wastes: technical issues

    International Nuclear Information System (INIS)

    Lytle, J.E.; Eyman, L.D.; Burton, D.W.; McBrayer, J.F.

    1986-01-01

    The US Department of Energy manages wastes that are both chemically hazardous and radioactive. These mixed wastes are often unique and many have national security implications. Management practices have evolved over the more than forty years that the Department and its predecessor agencies have been managing these wastes, both in response to better understanding of the hazards involved and in response to external, regulatory influences. The Department has recently standarized its waste management practices and has initited an R and D program to address priority issues identified by its operating contractor organizations. The R and D program is guided by waste management strategy that emphasizes reduction of human exposure to hazardous wastes in the environment, reduction of the amount and toxicity of wastes generated, treatment of wastes that are generated to reduce volumes and toxicities, and identification of alternatives to land disposal of wastes that remain hazardous following maximum practicable treatment

  4. Non-technical constraints on CBM develoment

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, R.M. [IEA Coal Research, London (United Kingdom)

    1995-12-31

    Non-technical issues affecting the development of coalbed methane are considered. These include infrastructure, economics and legal issues. In the USA the 1980 tax credit proved to be an important stimulus. Problems concerning ownership of resources may have hindered development. 36 refs., 1 fig., 1 tab.

  5. Representations and coverage of non-English-speaking immigrants and multicultural issues in three major Australian health care publications.

    Science.gov (United States)

    Garrett, Pamela W; Dickson, Hugh G; Whelan, Anna Klinken; Whyte, Linda

    2010-01-03

    No recent Australian studies or literature, provide evidence of the extent of coverage of multicultural health issues in Australian healthcare research. A series of systematic literature reviews in three major Australian healthcare journals were undertaken to discover the level, content, coverage and overall quality of research on multicultural health. Australian healthcare journals selected for the study were The Medical Journal of Australia (MJA), The Australian Health Review (AHR), and The Australian and New Zealand Journal of Public Health (ANZPH). Reviews were undertaken of the last twelve (12) years (1996-August 2008) of journal articles using six standard search terms: 'non-English-speaking', 'ethnic', 'migrant', 'immigrant', 'refugee' and 'multicultural'. In total there were 4,146 articles published in these journals over the 12-year period. A total of 90 or 2.2% of the total articles were articles primarily based on multicultural issues. A further 62 articles contained a major or a moderate level of consideration of multicultural issues, and 107 had a minor mention. The quantum and range of multicultural health research and evidence required for equity in policy, services, interventions and implementation is limited and uneven. Most of the original multicultural health research articles focused on newly arrived refugees, asylum seekers, Vietnamese or South East Asian communities. While there is some seminal research in respect of these represented groups, there are other communities and health issues that are essentially invisible or unrepresented in research. The limited coverage and representation of multicultural populations in research studies has implications for evidence-based health and human services policy.

  6. Representations and coverage of non-English-speaking immigrants and multicultural issues in three major Australian health care publications

    Science.gov (United States)

    2010-01-01

    Background No recent Australian studies or literature, provide evidence of the extent of coverage of multicultural health issues in Australian healthcare research. A series of systematic literature reviews in three major Australian healthcare journals were undertaken to discover the level, content, coverage and overall quality of research on multicultural health. Australian healthcare journals selected for the study were The Medical Journal of Australia (MJA), The Australian Health Review (AHR), and The Australian and New Zealand Journal of Public Health (ANZPH). Reviews were undertaken of the last twelve (12) years (1996-August 2008) of journal articles using six standard search terms: 'non-English-speaking', 'ethnic', 'migrant', 'immigrant', 'refugee' and 'multicultural'. Results In total there were 4,146 articles published in these journals over the 12-year period. A total of 90 or 2.2% of the total articles were articles primarily based on multicultural issues. A further 62 articles contained a major or a moderate level of consideration of multicultural issues, and 107 had a minor mention. Conclusions The quantum and range of multicultural health research and evidence required for equity in policy, services, interventions and implementation is limited and uneven. Most of the original multicultural health research articles focused on newly arrived refugees, asylum seekers, Vietnamese or South East Asian communities. While there is some seminal research in respect of these represented groups, there are other communities and health issues that are essentially invisible or unrepresented in research. The limited coverage and representation of multicultural populations in research studies has implications for evidence-based health and human services policy. PMID:20044938

  7. Major nuclear safety and regulatory issues in Korea

    International Nuclear Information System (INIS)

    Chang, Soon Heung

    2004-01-01

    Recently the value of nuclear energy is being re-considered due to the increase of oil price, the lack of energy supply, and the competition with renewable energy source. In Unites States, Europe, and East Asia, the prospects for continuous nuclear energy development or the policy for retaining nuclear energy have been announced. According to the nuclear energy promotion plan in Korea, there are 19 operating nuclear plants currently and more 7 plants will be constructed in the future. Until now, qualitative as well as quantitative growth is remarkable. Korean nuclear power plants achieved world-best level of capacity factor. However, because of the various nuclear industrial activities, we have a lot of regulatory issues for operating plants, building new plants, and other nuclear related facilities such as research reactors or radioactive waste storage facility. In this article, important regulatory issues which are emerging in Korea will be reviewed and the approaches to solve the issues including public acceptance will be presented. Especially, I will go into detail of two special case studies: The one is the thermal sleeve separation incident in Younggwang nuclear units 5 and 6 whose outage lasts about 80 days and 90 days respectively, which is not common in worldwide nuclear history. The other is about consensus meeting of Korea nuclear energy policy which was managed by a non-governmental organization. (author)

  8. Workshop on rock mechanics issues in repository design and performance assessment

    International Nuclear Information System (INIS)

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ''Rock Mechanics Issues in Repository Design and Performance Assessment'' on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions

  9. Embedding Career Issues in Advanced Psychology Major Courses

    Science.gov (United States)

    Halonen, Jane S.; Dunn, Dana S.

    2018-01-01

    Despite the popularity of the psychology major, complaints regularly arise about the value of majoring in psychology. This article reviews the workforce advantages that accrue to successful psychology students and encourages new strategies for emphasizing the professional development goal in the American Psychological Association's…

  10. Technical Support and Transfer of Geothrmal Technical Knowledge and Information

    Energy Technology Data Exchange (ETDEWEB)

    John W. Lund; Toni" Boyd

    2007-11-14

    The Geo-Heat Center (GHC) staff provided responses to 1442 technical support requests during the contract period (April 1, 2006 to September 30, 2007), which were six quarters under this contract. Our website, consisting of 1900 files, also contributes to our technical assistance activity. Downloaded files were 1,889,323 (3,448 per day) from our website, the total number of users was 1,365,258 (2,491 per day), and the total number of hits were 6,008,500 (10,064 per day). The GHC staff attended 60 workshops, short course and professional meeting and made 29 technical presentations. The staff also prepared and mailed out 2,000 copies of each of five issues of the GHC Quaterly Bulletin which contained 26 articles. We also mailed out approximately 5,000 papers and publications to interested individuals and organizations.

  11. Liability and automation : issues and challenges for socio-technical systems

    NARCIS (Netherlands)

    Contissa, G.; Laukyte, M.; Sartor, G.; Schebesta, H.; Masutti, A.; Lanzi, P.; Marti, P.; Tomasello, P.

    2013-01-01

    Who is responsible for accidents in highly automated systems? How do we apportion liability among the various participants in complex socio-technical organisations? How can different liability regulations at different levels (supranational, national, local) be harmonized? How do we provide for

  12. A systematic review of religious beliefs about major end-of-life issues in the five major world religions.

    Science.gov (United States)

    Chakraborty, Rajshekhar; El-Jawahri, Areej R; Litzow, Mark R; Syrjala, Karen L; Parnes, Aric D; Hashmi, Shahrukh K

    2017-10-01

    The objective of this study was to examine the religious/spiritual beliefs of followers of the five major world religions about frequently encountered medical situations at the end of life (EoL). This was a systematic review of observational studies on the religious aspects of commonly encountered EoL situations. The databases used for retrieving studies were: Ovid MEDLINE In-Process & Other Non-Indexed Citations, Ovid MEDLINE, Ovid EMBASE, Ovid PsycINFO, Ovid Cochrane Central Register of Controlled Trials, Ovid Cochrane Database of Systematic Reviews, and Scopus. Observational studies, including surveys from healthcare providers or the general population, and case studies were included for review. Articles written from a purely theoretical or philosophical perspective were excluded. Our search strategy generated 968 references, 40 of which were included for review, while 5 studies were added from reference lists. Whenever possible, we organized the results into five categories that would be clinically meaningful for palliative care practices at the EoL: advanced directives, euthanasia and physician-assisted suicide, physical requirements (artificial nutrition, hydration, and pain management), autopsy practices, and other EoL religious considerations. A wide degree of heterogeneity was observed within religions, depending on the country of origin, level of education, and degree of intrinsic religiosity. Our review describes the religious practices pertaining to major EoL issues and explains the variations in EoL decision making by clinicians and patients based on their religious teachings and beliefs. Prospective studies with validated tools for religiosity should be performed in the future to assess the impact of religion on EoL care.

  13. ITER technical advisory committee meeting

    International Nuclear Information System (INIS)

    Fujiwara, M.

    1999-01-01

    The ITER Technical Advisory Committee (TAC) meeting took place on December 20-22, 1999 at the Naka Joint Work Site. The objective of this meeting was to review the document 'Technical Basis for ITER-FEAT Outline Design (ODR)' issued by the Director on December 10. It was also aimed at providing the ITER Meeting scheduled for January 19-20, 2000 in Tokyo with a technical assessment of ODR and recommendations for the optimization of the anticipated plasma performance and engineering design, based on the guidelines approved by the Council in June 1998 and recommendations of the last TAC meeting

  14. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1983-06-01

    The unresolved safety issues summary is designed to provide the management of the nuclear regulatory commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to congress pursuant to section 210 of the Energy Reorganization Act of 1974 as amended. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The schedule for implementation will not normally be included in the task action plan(s) for the resolution of a USI since the nature and extent of the activities necessary to accomplish the implementation cannot normally be reasonably determined prior to the determination of a technical resolution. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  15. Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, R.D.; Warren, R.W. [eds.

    1998-05-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects.

  16. Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997

    International Nuclear Information System (INIS)

    Reynolds, R.D.; Warren, R.W.

    1998-05-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation's mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects

  17. Technical documentation challenges in aviation maintenance : a proceedings report.

    Science.gov (United States)

    2012-11-01

    The 2012 Technical Documentation workshop addressed both problems and solutions associated with technical : documentation for maintenance. These issues are known to cause errors, rework, maintenance delays, other : safety hazards, and FAA administrat...

  18. Technical progress by major task. Semiannual technical progress report, September 29, 1997 - March 29, 1998

    International Nuclear Information System (INIS)

    1998-01-01

    The technical progress achieved during the period 29 September 1997 through 29 March 1998 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described in this report. The report is organized by program task structure: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; RTG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair

  19. Liability and automation : issues and challenges for socio-technical systems

    NARCIS (Netherlands)

    Contissa, Giuseppe; Laukyte, Migle; Sartor, Giovanni; Schebesta, H.; Masutti, Anna; Lanzi, Paola; Marti, Patrizia; Paola, Tomasello

    2013-01-01


    Who is responsible for accidents in highly automated systems? How do we apportion liability among the various participants in complex socio-technical organisations? How can different liability regulations at different levels (supranational, national, local) be harmonized? How do we provide for

  20. Emerging ICT implementation issues in aged care.

    Science.gov (United States)

    Kapadia, Vasvi; Ariani, Arni; Li, Junhua; Ray, Pradeep K

    2015-11-01

    Demand for aged care services continues to soar as a result of an aging population. This increasing demand requires more residential aged care facilities and healthcare workforce. One recommended solution is to keep older people in their homes longer and support their independent life through the use of information and communication technologies (ICT). However, the aged care sector is still in the early stages of adopting ICT. The aim of this study was to identify the key issues that affect the adoption of ICT in the aged care sector. A systematic literature review was undertaken and involved four steps. The first two steps aimed to identify and select relevant articles. Data was then extracted from the selected articles and identified issues were analyzed and grouped into three major categories. ICT adoption issues were categorized into different perspectives, representing older people, health professionals and management. Our findings showed that all three groups were mostly concerned with issues around behavior, cost and lack of technical skills. Findings reported in this study will help decision makers at aged care settings to systematically understand issues related to ICT adoption and thus proactively introduce interventions to improve use of ICT in this sector. On the basis of our findings, we suggest future research focus on the examination of aged care workflow and assessment of return on ICT investment. Copyright © 2015. Published by Elsevier Ireland Ltd.

  1. Trends in Career and Technical Education Research

    Science.gov (United States)

    Rojewski, Jay W.; Asunda, Paul; Kim, Soo Jung

    2008-01-01

    The purpose of this literature review was to identify current trends and issues in research focusing on career and technical education (CTE). The primary sources of literature for this review included all research articles published in three refereed scholarly journals--"Career and Technical Education Research," "Journal of Career and Technical…

  2. 75 FR 33682 - Export Administration Regulations; Technical Amendments

    Science.gov (United States)

    2010-06-15

    ...-01] RIN 0694-AE93 Export Administration Regulations; Technical Amendments AGENCY: Bureau of Industry... Bureau of Industry and Security (BIS) makes a technical amendment to the Export Administration... review of final decisions and orders issued in BIS export control administrative enforcement proceedings...

  3. Design Issues for Producing Effective Multimedia Presentations.

    Science.gov (United States)

    Mason, Lisa D.

    1997-01-01

    Discusses design issues for interactive multimedia. Notes that technical communication instructors must consider navigational aids, the degree of control a user should have, audio cues, color and typographical elements, visual elements, and copyright issues. (RS)

  4. [DEONTOLOGICAL ISSUES IN RAILWAY HYGIENE].

    Science.gov (United States)

    Kaptsov, V A

    2015-01-01

    There are presented the main ethical and deontological problems encountered in practice and research activities of the hygienist in transport. There is shown the importance of strict compliance with hygienic standards, disregard for the principle of "technical attainability", the necessity of continuous training, improvement of skills of sanitary-educational activity and readiness to solve emerging ethical issues in connection with the development of scientific and technical progress.

  5. FUNCTIONS OF THE IMAGE IN SHAPING THE TECHNICAL THINKING OF STUDENTS

    Directory of Open Access Journals (Sweden)

    Mariusz Śniadkowski

    2014-11-01

    Full Text Available The world of technology can be a tool to support development processes, primarily cognitive, emotional and motivational. Adoption issues shaping the image function in the technical thinking of students is justified in many ways: a – impact on the development of human image; b – multidimensional image and diversity of its media resources; c – the influence of the image on shaping the attitudes and behaviors of education; d – state of research on the evolution of technical thinking of youth. Development of the technical thinking is one of the objectives in the process of technical education. A picture taking part in it by building concepts and technical imagination fulfilling a significant role in the illustration and understanding of issues and technical products and the specific technical action. Technical education requires from teachers to enter a wide range of activities in the teaching process in the direction of the effective application and the use of image in the development of technical thinking and imagination of students. Pictures have a prominent role here.

  6. Workshop on rock mechanics issues in repository design and performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ``Rock Mechanics Issues in Repository Design and Performance Assessment`` on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions. Selected papers have been indexed separately for inclusion the Energy Science and Technology Database.

  7. Issues in Electronic Publishing.

    Science.gov (United States)

    Meadow, Charles T.

    1997-01-01

    Discusses issues related to electronic publishing. Topics include writing; reading; production, distribution, and commerce; copyright and ownership of intellectual property; archival storage; technical obsolescence; control of content; equality of access; and cultural changes. (Author/LRW)

  8. How to be an Effective Technical Writer?

    OpenAIRE

    M Solaiman Ali; Dheya Al-Othmany

    2012-01-01

    Abstract--This paper has focused on technical writing as a skill for engineers. It has sought to define technical writing and throw light on the content and technique of writing the various components of successful technical reports (for example, articles, papers, or research reports, such as theses and dissertations). Then, it has highlighted other special features and principles of effective technical writing. The material in this paper is divided into seven major parts. Part 1 (Technical w...

  9. US decommissioning strategy in today's regulatory, technical, political, and economic environments

    International Nuclear Information System (INIS)

    Colvin, J.F.

    1995-01-01

    The United States commercial nuclear power industry is nearly forty years old. Soon after the turn of the century, the United States expects to see a significant rise in the number of plants requiring decommissioning. This, coupled with recent economic pressures which are impacting the U.S. electrical generation industry and have resulted in the premature shutdown of some nuclear power plants, heighten the need for clear regulations and standards addressing facility closure and decommissioning. Since the issue of decommissioning involves public health and safety, technical, environmental and financial aspects, this complex regulatory environment poses a major challenge to the industry in this area. There are three fundamental issues facing utilities as they develop strategies for the eventual decommissioning of their nuclear power plants. These issues are the regulatory approach to decommissioning, the question of the availability of adequate funding, including the uncertainty resulting from the uncertainty of waste disposal options, and the need to meet environmental standards for the protection of health and safety. Futhermore, these issues, in particular the economic-related issues, are magnified in the event of prematurely shut down nuclear power plant. (Author)

  10. Perspectives and reconciliation of viewpoints on risk assessment issues

    International Nuclear Information System (INIS)

    Smith, C.F.; Cohen, J.J.

    1980-01-01

    It is important to recognize the distinction between risk assessment and its components which include risk analysis, perspectives study, and decision analysis. Divergence of opinion within the scientific community as well as the public at large is a characteristic of issues related to nuclear power. The divergent opinions can largely be characterized as either optimistic or pessimistic in nature. Reconciliation of divergent viewpoints presents some difficult challenges. It is doubtful that issues which have an emotional or philosophical basis can be resolved through technical efforts. Public education on the technical issues might prove helpful

  11. Technical and Non-Technical Issues towards the Commercialisation of Wave Energy Converters

    DEFF Research Database (Denmark)

    Chozas, Julia Fernandez

    , it then determines the stages where there is a gap in research, and lastly, it analyses the identified key subjects. Accordingly, the thesis elaborates on seven areas: . i. It examines regulatory frameworks for wave energy developments and how they affect project execution. . ii. It investigates the role...... are of relevance to successfully reach the commercialisation of WECs and need attention from the sector as such, not least from device developers. The thesis is presented in two parts: a main introduction and a collection of papers. The first part provides a brief history of wave energy, introduces the research...... topic, describes the different disciplines addressed in the thesis and relates them. The eight papers comprise the core part of the work. The papers address the research topic in different ways: from a legal, social, technical and economic viewpoint, and from various WEC development stages. All...

  12. Technical and Non-Technical Issues Towards the Commercialisation of Wave Energy Converters

    DEFF Research Database (Denmark)

    Chozas, Julia Fernandez

    . As a result, the thesis first identifies the phases that generally appear within WEC developments, it then determines the stages where there is a gap in research, and lastly, it analyses the identified key subjects. Accordingly, the thesis elaborates on seven areas: i. It examines regulatory frameworks...... and a collection of papers. The first part provides a brief history of wave energy, introduces the research topic, describes the different disciplines addressed in the thesis and relates them. The eight papers comprise the core part of the work. The papers address the research topic in different ways: from a legal......, social, technical and economic viewpoint, and from various WEC development stages. All the analyses are carried out from the perspective of device developers. The understanding of WEC developments has been central to the outline of the thesis, as it has formed the framework of the work. The developments...

  13. Institutional issues affecting the integration and use of remotely sensed data and geographic information systems

    Science.gov (United States)

    Lauer, D.T.; Estes, J.E.; Jensen, J.R.; Greenlee, D.D.

    1991-01-01

    The developers as well as the users of remotely sensed data and geographic information system (GIS) techniques are associated with nearly all types of institutions in government, industry, and academia. Individuals in these various institutions often find the barriers to accepting remote sensing and GIS are not necessarily technical in nature, but can be attributed to the institutions themselves. Several major institutional issues that affect the technologies of remote sensing and GIS are data availability, data marketing and costs, equipment availability and costs, standards and practices, education and training, and organizational infrastructures. Not only are problems associated with these issues identified, but needs and opportunities also are discussed. -from Authors

  14. Key issues for passive safety

    International Nuclear Information System (INIS)

    Hayns, M.R.

    1996-01-01

    The paper represents a summary of the introductory presentation made at this Advisory Group Meeting on the Technical Feasibility and Reliability of Passive Safety Systems. It was intended as an overview of our views on what are the key issues and what are the technical problems which might dominate any future developments of passive safety systems. It is, therefore, not a ''review paper'' as such and only record the highlights. (author)

  15. Key issues for passive safety

    Energy Technology Data Exchange (ETDEWEB)

    Hayns, M R [AEA Technology, Harwell, Didcot (United Kingdom). European Institutions; Hicken, E F [Forschungszentrum Juelich GmbH (Germany)

    1996-12-01

    The paper represents a summary of the introductory presentation made at this Advisory Group Meeting on the Technical Feasibility and Reliability of Passive Safety Systems. It was intended as an overview of our views on what are the key issues and what are the technical problems which might dominate any future developments of passive safety systems. It is, therefore, not a ``review paper`` as such and only record the highlights. (author).

  16. Issues in the future supply of electricity to the Northeast. [1985 and 2000

    Energy Technology Data Exchange (ETDEWEB)

    Meier, P.M.; McCoy, T.H.; Rahman, S.

    1976-06-01

    This assessment of the problems of the electric sector is part of the BNL study on the Energy Future of the Northeast. Topics covered by the issue papers include the potential supply of energy to the Northeast from coal, oil, natural gas, liquefied natural gas, nuclear power, municipal waste, solar energy, and wind power, and the demand for energy in the Northeast from the industrial, transportation, and residential and commercial sectors. This paper compares energy demand projections derived in other parts of the Northeast Energy Perspectives Study to current utility projections; discusses major technical issues in capacity forecasting, including system load factors, outage rates, scale economies, unit sizes, and generation mix planning; discusses major siting constraints faced by each type of generation in the Northeast; and prepares preliminary forecasts of the number and type of new generation facilities necessary by 1985 and 2000, and an analysis of the implications for regional siting policy. (MCW)

  17. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  18. Technical safety requirements for the Annular Core Research Reactor Facility (ACRRF)

    International Nuclear Information System (INIS)

    Boldt, K.R.; Morris, F.M.; Talley, D.G.; McCrory, F.M.

    1998-01-01

    The Technical Safety Requirements (TSR) document is prepared and issued in compliance with DOE Order 5480.22, Technical Safety Requirements. The bases for the TSR are established in the ACRRF Safety Analysis Report issued in compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. The TSR identifies the operational conditions, boundaries, and administrative controls for the safe operation of the facility

  19. Fusion Canada issue 6

    International Nuclear Information System (INIS)

    1989-02-01

    A short bulletin from the National Fusion Program. Included in this issue is a funding report for CFFTP, a technical update for Tokamak de Varennes and a network for university research by the National Fusion Program. 4 figs

  20. MDRC's Career and Technical Education Projects. Issue Focus

    Science.gov (United States)

    MDRC, 2017

    2017-01-01

    The past decade has seen a resurgence of interest in career and technical education (CTE) as a way to engage students, help people build the skills necessary to succeed in a technologically advanced economy, and meet employer demand for workers. MDRC--which has a two-decade history of developing and evaluating CTE programs, including their…

  1. Tools to support important technical decisions during accident conditions

    International Nuclear Information System (INIS)

    Tenschert, J.; Bergiers, C.

    2008-01-01

    To handle design basis and beyond design basis accidents with intact reactor core, Nuclear Power Plants are using Emergency Operating Procedures (EOP) that they may have developed based on the generic Westinghouse Emergency Response Guidelines. Even though the EOPs are very directive, some questions are left to external support, i.e. to a team of persons constituting the so-called Technical Support Center (TSC). The Pressurized Water Reactor Owner Group (PWROG, previously Westinghouse Owner Group, WOG) has developed a TSC manual to support this group in their decision making process. Because of the specific and particular design of the Beznau NPP (KKB) Safety Systems, development of a plant-specific TSC manual required a lot of additions compared to the generic material. This plant-specific TSC manual is a helpful tool for the Site Emergency Director (SED) of the KKB to better evaluate issues and potential concerns arising while executing the EOPs. The majority of considered issues are relevant for beyond design basis accidents and external events. (orig.)

  2. MAJOR ISSUES IN BRINGING ABOUT SUSTAINABILITY

    Directory of Open Access Journals (Sweden)

    Mircea SAVEANU

    2015-03-01

    Full Text Available Research on sustainability is now fast approaching half a century of dedicated work. Although there have been significant breakthroughs, sustainability and its corollary, sustainable development, have proven a tough nut to crack. In our paper, we have started from some fundamental questions, which have yet to be answered and analyzed the implications that stem from these questions. Going past the problem of weakly quantifiable concepts in the definition, a very important issue is that of individual and community preferences. Specifically, these are all short to mid-term lived, while some sustainability problems, particularly those relating to the environment require a significantly longer time period. Another implication is that, given our limited resources, sustainable development would require a careful balance between investments among the three pillars of sustainability, and not follow a maximization policy. Lastly, we conclude that basing our sustainability policies on premises of linear evolution is a dangerous undertaking.

  3. Independent technical review, handbook

    International Nuclear Information System (INIS)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project

  4. Independent technical review, handbook

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  5. Analysis of Technical Feasibility of Traveling Wave Reactor

    International Nuclear Information System (INIS)

    Kim, Sang Ji; Yoo, Jae Woon; Bae, In Ho

    2011-01-01

    The status and trend of TWR, patent status and its major technical characteristics were examined in this study. Main technical features of traveling wave reactor can be characterized as a reactor operation without refueling up to the reactor life more than 60 years and TWR utilizes depleted uranium which would be produced from the enrichment process as a byproduct. Enriched fuel is only loaded to an igniter which is required for initiation of burning wave. In this study, quantitative analysis of TWR arising from the technical features was carried out in terms of resource utilization, safety and integrity, and proliferation resistance. In parallel with the concept review of TerraPower SWR design concepts, independent analysis of SWR design by altering a design specification and operation strategy was done in this study. The fuel rod design of SWR was also investigated based on the current database of fuel irradiation and performance. The technical issues of TWR or SWR which should be prior to detailed research and development can be summarized as follows: ·Strong physical protection is required during the shuffling or in-service inspection period to improve the proliferation resistance. ·New flow control logic or device is required for distributing the assembly-wise flow to be corresponded with power swing of fuel assembly. ·High integrity cladding material need to be developed for covering the high fast neutron fluence more than three times of current limit which result from the high burnup and long fuel cycle. The metal fuel under the high burnup condition should be validated through the irradiation test

  6. Environmental Science and Research Foundation. Annual technical report, April 11, 1994--December 31, 1994

    International Nuclear Information System (INIS)

    Reynolds, T.D.; Morris, R.C.; Markham, O.D.

    1995-06-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office, by the Environmental Science and Research Foundation (Foundation) for work under contract DE-AC07-94ID13268. The Foundation began, on April 11, 1994, to conduct environmental surveillance near to and distant from the Idaho National Engineering Laboratory, provide environmental public relations and education related to INEL natural resource issues, and conduct ecological and radioecological research benefiting major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Infrastructure

  7. Environmental Science and Research Foundation. Annual technical report, April 11, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, T.D.; Morris, R.C.; Markham, O.D. [eds.

    1995-06-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office, by the Environmental Science and Research Foundation (Foundation) for work under contract DE-AC07-94ID13268. The Foundation began, on April 11, 1994, to conduct environmental surveillance near to and distant from the Idaho National Engineering Laboratory, provide environmental public relations and education related to INEL natural resource issues, and conduct ecological and radioecological research benefiting major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Infrastructure.

  8. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  9. Transportable educational programs for scientific and technical professionals: More effective utilization of automated scientific and technical data base systems

    Science.gov (United States)

    Dominick, Wayne D.

    1987-01-01

    This grant final report executive summary documents a major, long-term program addressing innovative educational issues associated with the development, administration, evaluation, and widespread distribution of transportable educational programs for scientists and engineers to increase their knowledge of, and facilitate their utilization of automated scientific and technical information storage and retrieval systems. This educational program is of very broad scope, being targeted at Colleges of Engineering and Colleges of Physical sciences at a large number of colleges and universities throughout the United States. The educational program is designed to incorporate extensive hands-on, interactive usage of the NASA RECON system and is supported by a number of microcomputer-based software systems to facilitate the delivery and usage of the educational course materials developed as part of the program.

  10. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  11. Telemedicine: licensing and other legal issues.

    Science.gov (United States)

    Siegal, Gil

    2011-12-01

    The growth of information technology and telecommunications has created promising opportunities for better, faster, more accessible, barrier-free health care; telemedicine (TM). The feasibility of many TM projects depends on resolving legal issues. Mastering technical issues or providing training remain important benchmarks for implementation of TM, but legal issues constrain progress. This article identifies the key legal issues, maps current legislation, and offers a forecast of necessary steps to expedite the dissemination of TM. Copyright © 2011 Elsevier Inc. All rights reserved.

  12. Practices in communicating technical issues to the general public

    International Nuclear Information System (INIS)

    Drabova, D.; Storey, P.

    2006-01-01

    The conclusions and recommendations of this session can be summarized this way. - Basic goal for the regulator is to protect the public and communication is a must to fully achieve this goal. - Regulator should become the prime source of information to the public and the media, regulator should base its actions upon values of competence, independence, transparency and stringency. - Set up of a Information and Communication Policy will help for consistency and efficiency. Policy will include setting goals, strategies, organisational aspects, procedures, and tools. Practices should be developed in accordance with local culture. - Challenges will consider transparency, public involvement and consultation with the stakeholders. - Practices will include in general: - Interactions with the media like press releases, news conferences, media workshops. Printed materials from plant periodical status reports, to periodical and annual reports and specific reports. Audio-visual materials. Use of radio and TV. Web site and electronic mail. - Method chosen depends on the targeted audience and the relevance of the topic. - Messages should be clearly understandable. Do not dehumanize the message by making it technically unintelligible. - Two excellent examples presented. How local culture and social characteristics were taken into account in designing and implementing plans is key for success. - Municipalities are to be considered as front line stakeholders. - Communicators role is relevant to meet regulatory needs. Good collaboration between communicators and technical staff produces benefits for the nuclear regulator and the public. (authors)

  13. Technical clarity in inter-agency negotiations: Lessons from four hydropower projects

    Science.gov (United States)

    Burkardt, Nina; Lamb, Berton Lee; Taylor, Jonathan G.; Waddle, Terry J.

    1995-01-01

    We investigated the effect of technical clarity on success in multi-party negotiations in the Federal Energy Regulatory Commission (FERC) licensing process. Technical clarity is the shared understanding of dimensions such as the geographic extent of the project, range of flows to be considered, important species and life stages, and variety of water uses considered. The results of four hydropower licensing consultations are reported. Key participants were interviewed to ascertain the level of technical clarity present during the consultations and the degree to which the consultations were successful. Technical clarity appears to be a prerequisite for successful outcomes. Factors that enhance technical clarity include simple project design, new rather than existing projects, precise definition of issues, a sense of urgency to reach agreement, a sense of fairness among participants, and consistency in participation. Negotiators should not neglect the critical pre-negotiation steps of defining technical issues and determining appropriate studies, deciding how to interpret studies, and agreeing on responses to study results.

  14. A major safety overhaul

    CERN Multimedia

    2003-01-01

    A redefined policy, a revamped safety course, an environmental project... the TIS (Technical Inspection and Safety) Division has begun a major safety overhaul. Its new head, Wolfgang Weingarten, explains to the Bulletin why and how this is happening.

  15. Monetary Cooperation in East Asia: Major Issues and Future Prospects

    Directory of Open Access Journals (Sweden)

    Jai-Won Ryou

    2004-06-01

    Full Text Available The Asian currency crisis in 1997 and the launch of the euro in 1999 made the possibility and desirability of introducing a regional currency union in East Asia a point of debate. At present, the empirical findings and policy implications of previous studies are mixed. We are still in need of theoretical and empirical studies that capture the salient features of East Asia, and give us reliable recommendations for incentive structures, configurations and policy instruments in monetary cooperation in its various stages. This paper aims to review major conceptual and empirical issues relevant to monetary cooperation in East Asia, including proposals for a regional cooperative framework for exchange rate stability or forming a currency union in the region. East Asian countries have no experience with any type of monetary cooperation and all we have are hypothetical predictions. Nevertheless, East Asian countries may be on the brink of an historical evolution to economic and monetary integration, as Europe was half a century ago. The progressive integration of markets in East Asia has conferred a commonality of economic interest upon the countries in the region. As the economic structures of East Asian countries converge with one another through closer ties of trade, investment and finance, the necessity for monetary cooperation will be more likely to emerge in the future. Monetary cooperation in East Asia will be a long process. East Asian countries should make efforts to build collective institutions in the beginning.

  16. Visualizing interdependencies in technical design

    NARCIS (Netherlands)

    Oosterman, B.J.; Gaalman, G.J.C.; Kuijpers, F.P.J.; Riiahuhta, A.; Pulkkinen, A.

    2001-01-01

    The control and understanding of complex design processes is an important issue in practice and theory. Recent research shows that documentation and analysis of technical interactions between design tasks (using Design Structure Matrices) gives a thorough understanding of the underlying complex

  17. American Samoa Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Conrad, M.; Funk, K.; Kandt, A.; McNutt, P.

    2011-09-01

    This document is an initial energy assessment for American Samoa, the first of many steps in developing a comprehensive energy strategy. On March 1, 2010, Assistant Secretary of the Interior Tony Babauta invited governors and their staff from the Interior Insular Areas to meet with senior principals at the National Renewable Energy Laboratory (NREL). Meeting discussions focused on ways to improve energy efficiency and increase the deployment of renewable energy technologies in the U.S. Pacific Territories. In attendance were Governors Felix Camacho (Guam), Benigno Fitial (Commonwealth of the Northern Mariana Islands), and Togiola Tulafono, (American Samoa). This meeting brought together major stakeholders to learn and understand the importance of developing a comprehensive strategic plan for implementing energy efficiency measures and renewable energy technologies. For several decades, dependence on fossil fuels and the burden of high oil prices have been a major concern but never more at the forefront as today. With unstable oil prices, the volatility of fuel supply and the economic instability in American Samoa, energy issues are a high priority. In short, energy security is critical to American Samoa's future economic development and sustainability. Under an interagency agreement, funded by the Department of Interior's Office of Insular Affairs, NREL was tasked to deliver technical assistance to the islands of American Samoa. Technical assistance included conducting an initial technical assessment to define energy consumption and production data, establish an energy consumption baseline, and assist with the development of a strategic plan. The assessment and strategic plan will be used to assist with the transition to a cleaner energy economy. NREL provided an interdisciplinary team to cover each relevant technical area for the initial energy assessments. Experts in the following disciplines traveled to American Samoa for on-island site assessments: (1

  18. Global process industry initiatives to reduce major accident hazards

    Energy Technology Data Exchange (ETDEWEB)

    Pitblado, Robin [DNV Energy Houston, TX (United States). SHE Risk Management; Pontes, Jose [DNV Energy Rio de Janeiro, RJ (Brazil). Americas Region; Oliveira, Luiz [DNV Energy Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Since 2000, disasters at Texas City, Toulouse, Antwerp, Buncefield, P-36 and several near total loss events offshore in Norway have highlighted that major accident process safety is still a serious issue. Hopes that Process Safety Management or Safety Case regulations would solve these issues have not proven true. The Baker Panel recommended to BP several actions mainly around leadership, incentives, metrics, safety culture and more effective implementation of PSM systems. In Europe, an approach built around mechanical integrity and safety barriers, especially relating to technical safety systems, is being widely adopted. DNV has carried out a global survey of process industry initiatives, by interview and by literature review, for both upstream and downstream activities, to identify what the industry itself is planning to implement to enhance process safety in the next 5 - 10 years. This shows that an approach combining Baker Panel and EU barrier approaches and some nuclear industry real-time risk management approaches might be the best means to achieve a factor of 3-4 improvement in process safety. (author)

  19. Technical basis for the ITER-FEAT outline design

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-11-01

    This ITER EDA Documentation Series issue summarizes the results of the ITER Engineering Design Activities on the technical basis for the ITER-FEAT outline design. This issue also comprises some physical analysis activities as well as structure and goals of the Physics Expert Group activities.

  20. Technical basis for the ITER-FEAT outline design

    International Nuclear Information System (INIS)

    2000-01-01

    This ITER EDA Documentation Series issue summarizes the results of the ITER Engineering Design Activities on the technical basis for the ITER-FEAT outline design. This issue also comprises some physical analysis activities as well as structure and goals of the Physics Expert Group activities

  1. The future of nuclear power after Sizewell B. 3 v.: v. 1 Economic issues; v. 2 Environmental and safety issues; v. 3 Public perception issues

    International Nuclear Information System (INIS)

    1987-01-01

    The three days of conference proceedings are published in three separate volumes. The first includes 7 papers relating to economic issues - those presented at the Sizewell-B public inquiry and the changes in the economic situation since the inquiry ended. The electricity demand, how this demand is to be met by nuclear and other fuel sources and how energy conservation might be an economic alternative to simply building more generating capacity are all issues discussed. The possible privatisation of the industry is also touched on. Volume two has 8 papers concerned with environmental and safety issues. These include the influence of the Sizewell-B decision on nuclear licensing and reactor safety, the technical and safety aspects of pressurized water reactors (PWR), the roles of British Nuclear Fuels and the United Kingdom Atomic Energy Authority, and radiation protection and effluent discharge control. The six papers in volume 3 look at public perception issues - not only towards nuclear power but towards the public inquiry process. The local authority view, the Friends of the Earth case against the PWR, and technical expertise in the decision process are also topics covered. All the papers are indexed separately. (UK)

  2. B factory RF system design issues

    International Nuclear Information System (INIS)

    Zisman, M.S.

    1992-01-01

    We discuss the issues of relevance to the design of a B factory RF system. First, the general parameter regime is outlined, and the reasons behind certain commonly made choices are indicated. This regime involves high beam currents, and many relatively short bunches. Next, the physics difficulties associated with coupled-bunch instabilities are described briefly. We then describe in general terms the alternative approaches taken by various B factory designers, the motivation for these choices, and the technical issues raised by them. Technical solutions have been proposed for both the room-temperature and the superconducting RF scenarios, and considerable R ampersand D is being carried out worldwide to confirm and optimize these solutions

  3. B factory rf system design issues

    International Nuclear Information System (INIS)

    Zisman, M.S.

    1992-06-01

    We discuss the issues of relevance to the design of a B factory RF system. First, the general parameter regime is outlined, and the reasons behind certain commonly made choices are indicated. This regime involves high beam currents, and many relatively short bunches. Next, the physics difficulties associated with coupled-bunch instabilities are described briefly. We then describe in general terms the alternative approaches taken by various B factory designers, the motivation for these choices, and the technical issues raised by them. Technical solutions have been proposed for both the room-temperature and the superconducting RF scenarios, and considerable R ampersand D is being carried out worldwide to confirm and optimize these solutions

  4. (ICT) to Technical Services in Libraries

    African Journals Online (AJOL)

    The term technical services is used in this paper to refer to the major operations that are common to all Technical Services Divisions in libraries – namely, cataloguing, classification, indexing and abstracting. These activities have many repetitive components which used to be done manually. But today the new technology ...

  5. The technical designer: a new craft approach for creating seamless knitwear

    OpenAIRE

    Taylor, J

    2015-01-01

    The separation of the design and technical roles within commercial knitwear design has led to a 'technical skills gap' between designers and industrial knitting technology, which has contributed to the communication problems between designers and technicians. Historically, these issues have been ignored and designers have accepted compromised versions of their original ideas. However, the advent of seamless knitting technology has exacerbated the issue and the skills gap has grown exponential...

  6. NuPEER Dijon 2005 Symposium. Ageing issues in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Emond, David (ed.) [BCCN, Autorite de Surete Nucleaire, ASN, 6, place du Colonel Bourgoin, 75572 Paris Cedex 12 (France)

    2005-07-01

    The French Nuclear Safety Authority (ASN) organized an international symposium on regulatory aspects of ageing issues for nuclear pressure equipment. The ageing of nuclear pressure equipment is an issue of growing importance for nuclear regulators and material experts worldwide as age-related degradation of major pressure-retaining components challenges the remaining operating life of nuclear power plants. This symposium aimed at providing a forum for technical exchange among the staffs responsible for nuclear pressure equipment within the safety authorities and the associated expertise organisations. The contents of the symposium is as follows: 1. Control and supervision of safety of nuclear pressure equipment in France and abroad; 1.1. Position of the French Nuclear Safety Authority (1 paper); 1.2. Regulatory practices worldwide (4 papers); 1.3. Licence renewal: Field experience (2 papers); 1.4. Role of international organisations (1 paper); 2. Management of equipment and materials: From design to degradation mechanisms; 2.1. Operation and equipment (4 papers); 2. Evolution of materials (4 papers); 2.3. Fatigue degradation mechanisms (3 papers); 2.4. Contribution of research and development (4 papers); 3. In-service inspection: Evolutions, methods and strategies; 3.1. Methods and evolution (1 paper); 3.2. Qualification of methods (2 papers); 3.3. Surveillance strategies (2 papers); 4. Testimonies and points of view of utilities (3 papers); 5. Ageing issues taken into account in non nuclear fields (2 papers). The symposium began with workshops devoted to: Operation and equipment; Behaviour of materials; Fatigue degradations; Contributions of research and development. The symposium continued with plenary session that addressed the following issues: Control and supervision of safety of nuclear pressure equipment; Role of international organisations; In-service inspection: Objectives, methods and strategies; Point of view of utilities; Technical summary and

  7. Exercise redox biochemistry: Conceptual, methodological and technical recommendations

    Directory of Open Access Journals (Sweden)

    James N. Cobley

    2017-08-01

    Full Text Available Exercise redox biochemistry is of considerable interest owing to its translational value in health and disease. However, unaddressed conceptual, methodological and technical issues complicate attempts to unravel how exercise alters redox homeostasis in health and disease. Conceptual issues relate to misunderstandings that arise when the chemical heterogeneity of redox biology is disregarded: which often complicates attempts to use redox-active compounds and assess redox signalling. Further, that oxidised macromolecule adduct levels reflect formation and repair is seldom considered. Methodological and technical issues relate to the use of out-dated assays and/or inappropriate sample preparation techniques that confound biochemical redox analysis. After considering each of the aforementioned issues, we outline how each issue can be resolved and provide a unifying set of recommendations. We specifically recommend that investigators: consider chemical heterogeneity, use redox-active compounds judiciously, abandon flawed assays, carefully prepare samples and assay buffers, consider repair/metabolism, use multiple biomarkers to assess oxidative damage and redox signalling. Keywords: Exercise, Oxidative stress, Free radical, Antioxidants, Redox signalling

  8. Exercise redox biochemistry: Conceptual, methodological and technical recommendations.

    Science.gov (United States)

    Cobley, James N; Close, Graeme L; Bailey, Damian M; Davison, Gareth W

    2017-08-01

    Exercise redox biochemistry is of considerable interest owing to its translational value in health and disease. However, unaddressed conceptual, methodological and technical issues complicate attempts to unravel how exercise alters redox homeostasis in health and disease. Conceptual issues relate to misunderstandings that arise when the chemical heterogeneity of redox biology is disregarded: which often complicates attempts to use redox-active compounds and assess redox signalling. Further, that oxidised macromolecule adduct levels reflect formation and repair is seldom considered. Methodological and technical issues relate to the use of out-dated assays and/or inappropriate sample preparation techniques that confound biochemical redox analysis. After considering each of the aforementioned issues, we outline how each issue can be resolved and provide a unifying set of recommendations. We specifically recommend that investigators: consider chemical heterogeneity, use redox-active compounds judiciously, abandon flawed assays, carefully prepare samples and assay buffers, consider repair/metabolism, use multiple biomarkers to assess oxidative damage and redox signalling. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  9. Fusion Canada issue 7

    International Nuclear Information System (INIS)

    1989-05-01

    A short bulletin from the National Fusion Program. Included in this issue are CFFTP highlights on the Karlsruhe Isotope Separation System, a report on ITER tritium process systems, an experimental update on Tokamak de Varennes and Canada-U.S. bilateral technical collaboration topics. 2 figs

  10. Fusion Canada issue 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-05-01

    A short bulletin from the National Fusion Program. Included in this issue are CFFTP highlights on the Karlsruhe Isotope Separation System, a report on ITER tritium process systems, an experimental update on Tokamak de Varennes and Canada-U.S. bilateral technical collaboration topics. 2 figs.

  11. Neuroimaging findings with MDMA/ecstasy: technical aspects, conceptual issues and future prospects.

    Science.gov (United States)

    Reneman, Liesbeth; de Win, Maartje M L; van den Brink, Wim; Booij, Jan; den Heeten, Gerard J

    2006-03-01

    Users of ecstasy (3,4-methylenedioxymethamphetamine; MDMA) may be at risk of developing MDMA-induced injury to the serotonin (5-HT) system. Previously, there were no methods available for directly evaluating the neurotoxic effects of MDMA in the living human brain. However, development of in vivoneuroimaging tools have begun to provide insights into the effects of ecstasy on the human brain. Single photon emission computed tomography (SPECT), positron emission computed tomography (PET) and proton magnetic resonance spectroscopy (1H-MRS) studies which have evaluated ecstasy's neurotoxic potential will be reviewed and discussed in terms of technical aspects, conceptual issues and future prospects. Although PET and SPECT may be limited by several factors such as the low cortical uptake and the use of a non-optimal reference region (cerebellum) the few studies conducted so far provide suggestive evidence that people who heavily use ecstasy are at risk of developing subcortical, and probably also cortical reductions in serotonin transporter (SERT) densities, a marker of 5-HT neurotoxicity. There seem to be dose-dependent and transient reductions in SERT for which females may be more vulnerable than males. 1H-MRS appears to be a less sensitive technique for studying ecstasy's neurotoxic potential. Whether individuals with a relatively low ecstasy exposure also demonstrate loss of SERT needs to be determined. Because most studies have had a retrospective design, in which evidence is indirect and differs in the degree to which any causal links can be implied, longitudinal studies in human ecstasy users are needed to draw definite conclusions.

  12. Federal Technical Information and U.S. Competitiveness: Needs, Opportunities, and Issues.

    Science.gov (United States)

    Hill, Christopher T.

    1989-01-01

    Discusses the importance of competitiveness to the American economy and examines three areas where federal information policies affect American competitiveness: providing the private sector with technical information; making federal information resources available to industry; and restricting foreign access to those resources. For each area,…

  13. ITER co-ordinated technical activities

    International Nuclear Information System (INIS)

    2001-01-01

    As agreed upon between the ITER Engineering Design Activities (EDA) Parties 'Co-ordinated Technical Activities' (CTA) means technical activities which are deemed necessary to maintain the integrity of the international project, so as to prepare for the ITER joint implementation. The scope of these activities includes design adaptation to the specific site conditions, safety analysis and licensing preparation that are based on specific site offers, evaluation of cost and construction schedule, preparation of procurement documents and other issues raised by the Parties collectively, whilst assuring the coherence of the ITER project including design control

  14. Accelerator assisted repositories, technical issue identification and economic assessment

    Energy Technology Data Exchange (ETDEWEB)

    Myers, T.; Favale, A.; Berwald, D. [Northrop Grumman Corp., Bethpage, NY (United States)

    1995-12-31

    An investigation (technical and economic) is presented to quantify the impact of accelerator assisted repository (AAR) system on the US national nuclear repository strategy. An overview of US spent fuel policy is presented which provides a means to comparatively assess competing spent fuel disposition technologies under investigation. The advantages of an AAR system are highlighted and discussed. A companion economic analysis is presented. The results indicate that although a US geologic waste repository will continue to be required, waste partitioning and accelerator transmutation of selected actinides, and long-lived fission products, can result in substantial benefits. (author) 18 refs.

  15. Professional Issues In Software Engineering

    CERN Document Server

    Bott, Frank; Eaton, Jack; Rowland, Diane

    2000-01-01

    An comprehensive text covering all the issues that software engineers now have to take into account apart from the technical side of things. Includes information on the legal, professional and commercial context in which they work.

  16. Polymer Solidification Technology - Technical Issues and Challenges

    International Nuclear Information System (INIS)

    Jensen, Charles; Kim, Juyoul

    2010-01-01

    Many factors come into play, most of which are discovered and resolved only during full-scale solidification testing of each of the media commonly used in nuclear power plants. Each waste stream is unique, and must be addressed accordingly. This testing process is so difficult that Diversified's Vinyl Ester Styrene and Advanced Polymer Solidification are the only two approved processes in the United States today. This paper summarizes a few of the key obstacles that must be overcome to achieve a reliable, repeatable process for producing an approved Stable Class B and C waste form. Before other solidification and encapsulation technologies can be considered compliant with the requirements of a Stable waste form, the tests, calculations and reporting discussed above must be conducted for both the waste form and solidification process used to produce the waste form. Diversified's VERI TM and APS TM processes have gained acceptance in the UK. These processes have also been approved and gained acceptance in the U. S. because we have consistently overcome technical hurdles to produce a complaint product. Diversified Technologies processes are protected intellectual property. In specific instances, we have patents pending on key parts of our process technology

  17. Assessment and management of ageing of major nuclear power plant components important to safety: PWR vessel internals

    International Nuclear Information System (INIS)

    1999-10-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wear-out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), and water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues. The guidance reports are directed at technical experts from NPPs and from regulatory, plant design, manufacturing and technical support organizations dealing with specific plant

  18. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  19. Final Technical Report: Hydrogen Codes and Standards Outreach

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Karen I.

    2007-05-12

    This project contributed significantly to the development of new codes and standards, both domestically and internationally. The NHA collaborated with codes and standards development organizations to identify technical areas of expertise that would be required to produce the codes and standards that industry and DOE felt were required to facilitate commercialization of hydrogen and fuel cell technologies and infrastructure. NHA staff participated directly in technical committees and working groups where issues could be discussed with the appropriate industry groups. In other cases, the NHA recommended specific industry experts to serve on technical committees and working groups where the need for this specific industry expertise would be on-going, and where this approach was likely to contribute to timely completion of the effort. The project also facilitated dialog between codes and standards development organizations, hydrogen and fuel cell experts, the government and national labs, researchers, code officials, industry associations, as well as the public regarding the timeframes for needed codes and standards, industry consensus on technical issues, procedures for implementing changes, and general principles of hydrogen safety. The project facilitated hands-on learning, as participants in several NHA workshops and technical meetings were able to experience hydrogen vehicles, witness hydrogen refueling demonstrations, see metal hydride storage cartridges in operation, and view other hydrogen energy products.

  20. International linear collider. A technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Ned [Argonne National Laboratory, IL (United States); Aderhold, Sebastian [DESY, Hamburg (Germany); Adolphsen, Chris [Stanford Linear Accelerator Center, Menlo Park, CA (United States); and others

    2012-07-01

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R and D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  1. International Linear Collider-A Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Elsen, Eckhard; /DESY; Harrison, Mike; /Brookhaven; Hesla, Leah; /Fermilab; Ross, Marc; /Fermilab; Royole-Degieux, Perrine; /Paris, IN2P3; Takahashi, Rika; /KEK, Tsukuba; Walker, Nicholas; /DESY; Warmbein, Barbara; /DESY; Yamamoto, Akira; /KEK, Tsukuba; Yokoya, Kaoru; /KEK, Tsukuba; Zhang, Min; /Beijing, Inst. High Energy Phys.

    2011-11-04

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  2. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    Energy Technology Data Exchange (ETDEWEB)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  3. Hanford sitewide grounwater remediation - supporting technical information

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-05-01

    The Hanford Sitewide Groundwater Remediation Strategy was issued in 1995 to establish overall goals for groundwater remediation on the Hanford Site. This strategy is being refined to provide more detailed justification for remediation of specific plumes and to provide a decision process for long-range planning of remediation activities. Supporting this work is a comprehensive modeling study to predict movement of the major site plumes over the next 200 years to help plan the remediation efforts. The information resulting from these studies will be documented in a revision to the Strategy and the Hanford Site Groundwater Protection Management Plan. To support the modeling work and other studies being performed to refine the strategy, this supporting technical information report has been produced to compile all of the relevant technical information collected to date on the Hanford Site groundwater contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, and description of the contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, description of the contaminant plumes, rate of movement based on the conceptual model and monitoring data, risk assessment, treatability study information, and current approach for plume remediation

  4. Guidelines for Preparing Final Technical Reports

    International Development Research Centre (IDRC) Digital Library (Canada)

    fdieudonne

    Prior to submitting the Final Technical Report, any outstanding issues related to dissemination in accordance with ... The report should be an opportunity to reflect on the management of the project from various perspectives: .... of poor quality.

  5. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1982-06-01

    The unresolved safety issues summary is designed to provide the management of the Nuclear Regulatory Commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to Congress pursuant to Section 210 of the Energy Reorganization Act of 1974 as amended. This summary utilizes data collected from the Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, and the National Laboratories and is prepared by the Office of Resource Management. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  6. Critically Review and Discuss Major Issues in“Financing Small Businesses”

    Institute of Scientific and Technical Information of China (English)

    MA Ming-lu

    2013-01-01

    The main purpose of this essay is to discuss and study the financing issues related to small business, and there is analysis about different financing methods, which divides them into internal and external sources. The essay examines the literature, mainly journal articles, on the financing issues related to internal and external financing and compare them and discuss about their advantages and disadvantages. And in order to make the points clear, it relates to some real cases of small companies financing methods, which helps to put the discussion in proper context.

  7. The transportation issue management system: A tool for issue resolution

    International Nuclear Information System (INIS)

    Branch, K.M.; Boryczka, M.K.

    1987-01-01

    During the last decade, issue management programs have been developed and used by a number of large corporations in the United States. These systems have generally been designed to help senior program managers identify issues, develop strategic plans, and resolve issues. These systems involve scanning and abstracting literature to create a database that is then used for 1) issue identification, 2) issue analysis, 3) priority assessment, 4) development of corporate position/strategic options, and 5) action planning and implementation. Most of the existing systems rely on staff to identify trends in the computerized output, analyze the importance of the issue to the company, and assist in developing corporate responses. The Department of Energy has recently developed an issue management system for the Office of Civilian Radioactive Waste Management's (OCRWM) transportation program. This system is designed to help DOE identify institutional issues related to radioactive waste transportation, analyze the issues, and resolve them in a manner that is responsive to interested parties. The system will contain pertinent information from DOE technical reports, other federal documents, correspondence, professional journals, popular literature, newsclips, legislation and testimony. The program is designed around a number of institutional issues including: prenotification, physical protection procedures; highway, rail, and barge routing; inspections and enforcement of shipments; emergency response; liability, cask design and testing; overweight trucks; rail service; modal mix; infrastructure improvements; training standards, and operational procedures

  8. Nuclear Power Plant Temelin Technical Support Centre

    International Nuclear Information System (INIS)

    Krizek, K.

    2000-01-01

    The erection of the Technical Support Centre for the Nuclear Power Plant Temelin has been a relatively sophisticated and costly issue. It was by proper use of the existing systems, as e.g. I and C, ISE and other systems, that a robust system has been created that is able to meet any requirements laid on the performance of the Technical Support Centre. The decision of the utility CEZ, a.s. that made it possible to establish the Technical Support Centre at the Nuclear Power Plant Temelin has been a right step which shows the level of safety culture within the utility. (author)

  9. Technical and commercial aspects of the connection of wind turbines to electricity supply networks in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, P. [Garrad Hassan & Partners Ltd., Glasgow (United Kingdom)

    1996-12-31

    This paper reviews some technical and commercial issues now topical for wind energy developments in Europe. The technical issues are important because of the weak nature of the existing electricity systems in rural or upland areas. Several commercial issues are considered which may improve the economics of wind energy as market incentives are gradually withdrawn. 9 refs.

  10. Middlesex Community College Software Technical Writing Program.

    Science.gov (United States)

    Middlesex Community Coll., Bedford, MA.

    This document describes the Software Technical Writing Program at Middlesex Community College (Massachusetts). The program is a "hands-on" course designed to develop job-related skills in three major areas: technical writing, software, and professional skills. The program was originally designed in cooperation with the Massachusetts High…

  11. How to be an Effective Technical Writer?

    Directory of Open Access Journals (Sweden)

    M Solaiman Ali

    2012-07-01

    Full Text Available Abstract--This paper has focused on technical writing as a skill for engineers. It has sought to define technical writing and throw light on the content and technique of writing the various components of successful technical reports (for example, articles, papers, or research reports, such as theses and dissertations. Then, it has highlighted other special features and principles of effective technical writing. The material in this paper is divided into seven major parts. Part 1 (Technical writing for engineers stresses that a successful engineering career requires strong writing skills. Part 2 (How to write the major sections or elements of a report describes the techniques of writing the abstract, introduction, literature review, procedure/methods & materials, results, discussion, conclusion, and recommendations. Part 3 (Special features of technical writing brings into focus some of the special features of technical writing such as tables & graphs in the text, graphics in instructions, team writing, ethics (plagiarism, document sources, three citation styles and IEEE reference style. Part 4 (Technical usage deals with writing abbreviations, initialisms and acronyms, numbers, units of measurement, and equations.Part 5 (Technical style highlights the imperative writing style and other features of technical writing such as the use of active and passive voices, plain vs. complex syntax, avoiding redundant or superfluous expressions, and vague generalities, using words or expressions with visual impact, the past tense to describe experimental work, the present tense to describe hypotheses, principles, theories and truths, and breaking up the text of the report into short sections. Part 6 (Document specifications emphasizes the technical writer’s need to conform to such document specifications as word count, format, font, number of words per line of text imposed. Part 7 (Reader-friendly technical writing suggests choosing the varied writing modes

  12. Analysis of Causes of Major Environmental Issues Occurring on Sea Coastlines of the Peter the Great Bay

    Science.gov (United States)

    Golikov, S. Yu; Dulepov, V. I.; Maiorov, I. S.

    2017-11-01

    The geoecological assessment of any territory or aquatic area is based on the evaluation of the natural resource potential, conditions and factors influencing its development as well as the analysis of major environmental issues that characterize the current regional state. The monitoring of water ecosystems under the conditions of anthropogenic impact on coastal areas is of significant importance within the study of the conservation and restoration of biodiversity, in the assessment of the dynamics of various environmental factors and their effects on ecosystems and on the bioresources management planning.

  13. Technical evaluation report on the 120 Vac vital instrument buses and inverter Technical Specifications Issue B71

    International Nuclear Information System (INIS)

    St Leger-Barter, G.; White, R.L.

    1982-01-01

    The operation of a Pressurized Water Reactor (PWR) with one of its 120 Vac vital buses energized in an off-normal mode was analyzed. A Probabilistic Risk Assessment was made to determine the increment of risk by energizing a vital bus from an off-site source directly vs energizing it from its normal, uninterruptible source (i.e., a battery/inverter arrangement). The calculations were made based on uninterruptible source energized vital buses as the normal mode. The analysis indicated that a reduction in the incremental risk increase (caused by plant operation with a vital bus being energized in an off-normal mode) can be accomplished by limiting the time permitted in that condition. Currently, the time that a vital bus can be energized in the off-normal mode is not universally time-limited by plant Technical Specifications. Several alternatives for the reduction in incremental risk were examined and their value/impacts were derived. These data indicate that a recommendation be made for a Technical Specification time limitation of 72 hours per year for off-normal energizing a vital bus during operation of a PWR

  14. 76 FR 60017 - Technical Conference on Penalty Guidelines; Notice of Technical Conference on Penalty Guidelines

    Science.gov (United States)

    2011-09-28

    ... Conference on Penalty Guidelines; Notice of Technical Conference on Penalty Guidelines The staff of the... the Penalty Guidelines, which the Commission issued on September 17, 2010.\\1\\ The conference will be... impact of the Penalty Guidelines on compliance and enforcement matters. More information on the topics to...

  15. Technical risk audit method (tram): development and application to the auditing of major hazard sites

    International Nuclear Information System (INIS)

    Maddison, T.; Kirk, P.; Stansfield, R.

    1998-01-01

    The Technical Risk Audit Method (TRAM) has been developed by the UK Health and Safety Executive (UK HSE) as a risk-based auditing and inspection tool for application to Major Hazard process plant covered by the Seveso-I/Seveso-II directives. The objective of TRAM is to provide a framework in which plant inspection or audit can be undertaken and results collated. TRAM comprises a paper audit procedure and a software tool which is used to analyse the results. TRAM includes a semi-quantitative risk model, which may be used to rank risks both within and between similar facilities, using qualitative data collected during the inspection. The results of this qualitative analysis may be used to identify where inspector resources would be best deployed. To date, TRAM has been applied to a number of LPG storage and processing facilities in the UK, and the lessons learnt are being used to develop a robust version suitable for use by inspectors. The methodology will be made consistent with the risk model included in IEC 61508 'Functional safety of electrical/electronic/programmable electronic safety-related systems' to permit its application to a wide range of process plant and other hazardous facilities. (authors)

  16. A technical analysis of the IAEA nuclear safeguards

    International Nuclear Information System (INIS)

    Yoon, J. W.

    1998-01-01

    In the post-Cold War era, the threats of horizontal nuclear proliferation emerge as the forefront security issue while the nuclear arms races among existing nuclear weapon states reduce to a remarkable extent. In this context, there arises lots of research attention to the IAEA nuclear safeguards which have been viewed as the core of international monitoring on the clandestine nuclear activities of potential proliferators. However, previous attention tended to highlight the political aspects of the IAEA nuclear safeguards, centering on the possibilities and limitations of the IAEA's inspection authority. In contrast, this paper purports to focus on the technical aspects of the IAEA nuclear safeguards, so it can show the intrinsic problems of those safeguards in stemming the proliferation of nuclear weapons. This paper mainly deals with the technical objectives and options of the IAEA nuclear safeguards, the technical indices of clandestine nuclear activities, and some measures to improve the efficacy of the IAEA nuclear safeguards. Hopefully, this paper is expected to lead us to approach the issue of the North Korean nuclear transparency from the technical perspective as well as the political one

  17. Review of criticality safety and shielding analysis issues for transportation packages

    International Nuclear Information System (INIS)

    Parks, C.V.; Broadhead, B.L.

    1995-01-01

    The staff of the Nuclear Engineering Applications Section (NEAS) at Oak Ridge National Laboratory (ORNL) have been involved for over 25 years with the development and application of computational tools for use in analyzing the criticality safety and shielding features of transportation packages carrying radioactive material (RAM). The majority of the computational tools developed by ORNL/NEAS have been included within the SCALE modular code system (SCALE 1995). This code system has been used throughout the world for the evaluation of nuclear facility and package designs. With this development and application experience as a basis, this paper highlights a number of criticality safety and shielding analysis issues that confront the designer and reviewer of a new RAM package. Changes in the types and quantities of material that need to be shipped will keep these issues before the technical community and provide challenges to future package design and certification

  18. Evaluation of Station Blackout accidents at nuclear power plants. Technical findings related to Unresolved Safety Issue A-44. Draft report for comment

    International Nuclear Information System (INIS)

    Baranowsky, P.W.

    1985-05-01

    ''Station Blackout,'' which is the complete loss of alternating current (ac) electrical power in a nuclear power plant, has been designated as Unresolved Safety Issue A-44. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. This report documents the findings of technical studies performed as part of the program to resolve this issue. The important factors analyzed include: the frequency of loss of offsite power; the probability that emergency or onsite ac power supplies would be unavailable; the capability and reliability of decay heat removal systems independent of ac power; and the likelihood that offsite power would be restored before systems that cannot operate for extended periods without ac power fail, thus resulting in core damage. This report also addresses effects of different designs, locations, and operational features on the estimated frequency of core damage resulting from station blackout events

  19. Effective approaches to regulate mobile advertising: moving towards a co-ordinated legal, self-regulatory, and technical response

    DEFF Research Database (Denmark)

    Cleff, Evelyne Beatrix

    2009-01-01

    This article aims to contribute to the ongoing discourse about the issue of privacy in the mobile advertising domain. The article discusses the fundamental principles and information practices used in digital environments for protecting individuals' private data. Major challenges are identified t......, such as legislation, self-regulation and technical approaches. It is intended to promote an effective approach to improve consumer privacy in the mobile advertising domain.......This article aims to contribute to the ongoing discourse about the issue of privacy in the mobile advertising domain. The article discusses the fundamental principles and information practices used in digital environments for protecting individuals' private data. Major challenges are identified...... that should be addressed, so that fair information principles can be applied in the context of m-advertising. It also points out the limitations of these principles. Furthermore, the article discusses a range of models that is available for regulating the collection, use and disclosure of personal data...

  20. Integrating ethical and technical considerations in the energy debate

    International Nuclear Information System (INIS)

    Pickering, G.W.

    1980-01-01

    A study being carried out by the author on analyzing and integrating ethical and technical considerations in formulating an energy policy for the United States, with special emphasis on nuclear issues, is reviewed. Beginning with an overview of the historical development of the American nuclear program and the emergence of an organized politcal opposition to that program, seven outstanding issues are identified: institutional adequacy, radiation, reactor safety, waste disposal, economics and reliability, international consequences, and alternative energy sources, and an attempt is made to identify the range of dispute in relation to each. A framework is proposed for analyzing these issues by introducing guidelines for defining a social justice problem. Suggestions are made about how to get morally serious about such issues, and this framework is applied to four issues: radiation, reactor safety, waste disposal, and institutional adequacy. Ultimately it is a political choice whether or not to include nuclear power in a nations's energy policy. It is important, however, that such choices be made using the best technical and ethical assessments of the consequences. (LL)

  1. RANET technical guidelines: Interim technical guidelines for national assistance capabilities. Emergency preparedness and response. Date effective: 1 January 2007

    International Nuclear Information System (INIS)

    2006-12-01

    The publication is issued as an attachment to EPR-RANET (2006) and has the same status. It provides administrative and technical guidelines for National Assistance Capabilities and enters into effect on 1 January 2007. Additional technical guidelines are under development by assistance work group under international Action Plan for Strengthening the International Preparedness and Response System for Nuclear and Radiological Emergencies. As these are finalised they will be included in this document

  2. Assessment of the technical specifications for a flip-standard TRIGA core

    International Nuclear Information System (INIS)

    Feltz, D.E.; Randall, J.D.

    1974-01-01

    The Technical Specifications for the Texas A and M University mixed, FLIP-Standard TRIGA core were the first submitted and approved under the draft version of Standard ANS-15.1. According to one AEC official these were the best Technical Specifications ever issued to a Research Reactor. The Technical Specifications are evaluated after operating under them for over seven months. (author)

  3. Assessment of the technical specifications for a flip-standard TRIGA core

    Energy Technology Data Exchange (ETDEWEB)

    Feltz, D E; Randall, J D [Texas A and M University (United States)

    1974-07-01

    The Technical Specifications for the Texas A and M University mixed, FLIP-Standard TRIGA core were the first submitted and approved under the draft version of Standard ANS-15.1. According to one AEC official these were the best Technical Specifications ever issued to a Research Reactor. The Technical Specifications are evaluated after operating under them for over seven months. (author)

  4. Non-technical skills training to enhance patient safety.

    Science.gov (United States)

    Gordon, Morris

    2013-06-01

      Patient safety is an increasingly recognised issue in health care. Systems-based and organisational methods of quality improvement, as well as education focusing on key clinical areas, are common, but there are few reports of educational interventions that focus on non-technical skills to address human factor sources of error. A flexible model for non-technical skills training for health care professionals has been designed based on the best available evidence, and with sound theoretical foundations.   Educational sessions to improve non-technical skills in health care have been described before. The descriptions lack the details to allow educators to replicate and innovate further.   A non-technical skills training course that can be delivered as either a half- or full-day intervention has been designed and delivered to a number of mixed groups of undergraduate medical students and doctors in postgraduate training. Participant satisfaction has been high and patient safety attitudes have improved post-intervention.   This non-technical skills educational intervention has been built on a sound evidence base, and is described so as to facilitate replication and dissemination. With the key themes laid out, clinical educators will be able to build interventions focused on numerous clinical issues that pay attention to human factor contributors to safety. © 2013 John Wiley & Sons Ltd.

  5. A Synopsis of Technical Issues for Monitoring Sediment in Highway and Urban Runoff

    Science.gov (United States)

    Bent, Gardner C.; Gray, John R.; Smith, Kirk P.; Glysson, G. Douglas

    2000-01-01

    Accurate and representative sediment data are critical for assessing the potential effects of highway and urban runoff on receiving waters. The U.S. Environmental Protection Agency identified sediment as the most widespread pollutant in the Nation's rivers and streams, affecting aquatic habitat, drinking water treatment processes, and recreational uses of rivers, lakes, and estuaries. Representative sediment data are also necessary for quantifying and interpreting concentrations, loads, and effects of trace elements and organic constituents associated with highway and urban runoff. Many technical issues associated with the collecting, processing, and analyzing of samples must be addressed to produce valid (useful for intended purposes), current, complete, and technically defensible data for local, regional, and national information needs. All aspects of sediment data-collection programs need to be evaluated, and adequate quality-control data must be collected and documented so that the comparability and representativeness of data obtained for highway- and urban-runoff studies may be assessed. Collection of representative samples for the measurement of sediment in highway and urban runoff involves a number of interrelated issues. Temporal and spatial variability in runoff result from a combination of factors, including volume and intensity of precipitation, rate of snowmelt, and features of the drainage basin such as area, slope, infiltration capacity, channel roughness, and storage characteristics. In small drainage basins such as those found in many highway and urban settings, automatic samplers are often the most suitable method for collecting samples of runoff for a variety of reasons. Indirect sediment-measurement methods are also useful as supplementary and(or) surrogate means for monitoring sediment in runoff. All of these methods have limitations in addition to benefits, which must be identified and quantified to produce representative data. Methods for

  6. Validation issues for depletion and criticality analysis in burnup credit

    International Nuclear Information System (INIS)

    Parks, C.V.; Broadhead, B.L.; Dehart, M.D.; Gauld, I.C.

    2001-01-01

    This paper reviews validation issues associated with implementation of burnup credit in transport, dry storage, and disposal. The issues discussed are ones that have been identified by one or more constituents of the United States technical community (national laboratories, licensees, and regulators) that have been exploring the use of burnup credit. There is not necessarily agreement on the importance of the various issues, which sometimes is what creates the issue. The broad issues relate to the paucity of available experimental data (radiochemical assays and critical experiments) covering the full range and characteristics of spent nuclear fuel in away-from-reactor systems. The paper will also introduce recent efforts initiated at Oak Ridge National Laboratory (ORNL) to provide technical information that can help better assess the value of different experiments. The focus of the paper is on experience with validation issues related to use of burnup credit for transport and dry storage applications. (author)

  7. Portal Vein Embolization as an Oncosurgical Strategy Prior to Major Hepatic Resection: Anatomic, Surgical and Technical Considerations for Successful Outcomes

    Directory of Open Access Journals (Sweden)

    Sonia Tewani Orcutt

    2016-03-01

    Full Text Available Preoperative portal vein embolization (PVE is used to extend the indications for major hepatic resection, and it has become the standard of care for selected patients with hepatic malignancies treated at major hepatobiliary centers. To date, various techniques with different embolic materials have been used with similar results in the degree of liver hypertrophy. Regardless of the specific strategy used, both surgeons and interventional radiologists must be familiar with each other’s techniques to be able to create the optimal plan for each individual patient. Knowledge of the segmental anatomy of the liver is paramount to fully understand the liver segments that need to be embolized and resected. Understanding the portal vein anatomy and the branching variations, along with the techniques used to transect the portal vein during hepatic resection, is important because these variables can affect the PVE procedure and the eventual surgical resection. Comprehension of the advantages and disadvantages of approaches to the portal venous system and the various embolic materials used for PVE is essential to best tailor the procedures for each patient and to avoid complications. Before PVE, meticulous assessment of the portal vein branching anatomy is performed with cross-sectional imaging, and embolization strategies are developed based on the patient’s anatomy. The PVE procedure consists of several technical steps, and knowledge of these technical tips, potential complications and how to avoid the complications in each step is of great importance for safe and successful PVE, and ultimately successful hepatectomy. Because PVE is used as an adjunct to planned hepatic resection, priority must always be placed on safety, without compromising the integrity of the future liver remnant, and close collaboration between interventional radiologists and hepatobiliary surgeons is essential to achieve successful outcomes.

  8. Nuclear Energy Center Site Survey, 1975. Part IV. Practical issues of implementation

    International Nuclear Information System (INIS)

    1976-01-01

    The objective of Part IV is to assemble, organize, and present facts, analyses, and responsible viewpoints with respect to issues going beyond technical and technical-economic tradeoff considerations that bear on NECs; to identify options; and to analyze and comment on merits of alternative options. Five broad groups of issues addressed include jurisdictional and institutional; economic; social and political; accident risk; national security; and nuclear material safeguards

  9. Fusion Canada issue 4

    International Nuclear Information System (INIS)

    1988-05-01

    A short bulletin from the National Fusion Program. Included in this issue is a technical update on Tokamak de Varennes, a report on the Beatrix II Breeding Materials Test Program, the Tritium glovebox system for UPM, Saudi Arabia, a broad update of the Canadian Fusion Fuels Technology Project is also included. 1 fig

  10. Fusion Canada issue 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-05-01

    A short bulletin from the National Fusion Program. Included in this issue is a technical update on Tokamak de Varennes, a report on the Beatrix II Breeding Materials Test Program, the Tritium glovebox system for UPM, Saudi Arabia, a broad update of the Canadian Fusion Fuels Technology Project is also included. 1 fig.

  11. Technical Leadership Development Program

    Science.gov (United States)

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  12. An Effective Health and Medical Technical Authority

    Science.gov (United States)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that

  13. Cost estimate and economic issues associated with the MOX option (prior to DOE's record of decision)

    International Nuclear Information System (INIS)

    Reid, R.L.; Miller, J.W.

    1997-04-01

    Before the January 1997 Record of Decision (ROD), the U.S. Department of Energy Office of Fissile Materials Disposition (DOE-MD) evaluated three technologies for the disposition of ∼50 MT of surplus plutonium from defense-related programs-reactors, immobilization, and deep boreholes. As part of the process supporting the ROD, and comprehensive assessment of technical viability, cost, and schedule was conducted by DOE-MD and its national laboratory contractors. Oak Ridge National Laboratory managed and coordinated the life-cycle cost (LCC) assessment effort for this program. This report discusses the economic analysis methodology and the results for the reactor options considered prior to ROD. A secondary intent of the report is to discuss major technical and economic issues that impact cost and schedule. To evaluate the economics of the reactor option and other technologies on an equitable basis, a set of cost-estimating guidelines and a common cost-estimating format were utilized by all three technology teams. This report includes the major economic analysis assumptions and the comparative constant-dollar and discounted-dollar LCCs for all nine reactor scenarios

  14. WATTec '91. The technical professional: Staying current/staying competitive

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    WATTec '91 will concentrate on six areas of major importance in today's world: Education - training, hiring and retraining the technical professional at a time when there is a significant decline in enrollment in engineering and scientific disciplines; Environment - the technologies available, and those needed, to deal with waste, energy, and natural resource issues; Manufacturing - taking the factory of the future from a vision to reality; Materials - materials and material processes that will shape our future; Quality - tools for continuous improvement in day-to-day operations now in use and those that will be needed in the future; and Technology transfer - using, sharing, understanding, and adopting the technologies of the future and managing the people who rapidly implement them within our industries. All papers have been processed for inclusion on the data base

  15. Summary Report of the Technical Meeting on Inelastic Scattering and Capture Cross-section Data of Major Actinides in the Fast Neutron Region

    International Nuclear Information System (INIS)

    Plompen, Arjan; Kawano, Toshihiko; Capote Noy, Roberto

    2012-05-01

    Recently, tight target uncertainties on the capture and inelastic scattering data for major actinides were derived from advanced reactor sensitivity studies. A Technical Meeting on 'Inelastic Scattering and Capture Cross-section Data of Major Actinides in the Fast Neutron Region' was held at IAEA Headquarters, Vienna, Austria to review the status of nuclear data libraries for these cross sections, the status of the experimental results by which these can be tested and to evaluate what advances in nuclear modeling and measurement technique may bring to improve the knowledge of these cross sections. The participants compared recent evaluations with various modeling approaches that have not yet been adopted in data libraries. Several points of interest were found. First, different evaluations may show very similar performance for macroscopic benchmarks. Second, recent modeling improvements from different communities and using different codes tend to converge on the principles in the case of coupled channel calculations. In particular, it was shown that meaningful results require convergence with respect to the number of coupled channels and the use of the dispersive coupled channels potential based with an isospin dependent term to treat neutrons and protons in a coherent manner appears to be uncontested. Also, the issue regarding the use of transmission coefficients from coupled channels calculations in the Hauser Feshbach model was tackled. Recent and ongoing experimental efforts were presented for capture and inelastic scattering on the major actinides. Results from these are likely to become available in a period from 2 to 5 years. A discussion on the representation of the data in EXFOR revealed that care must be taken interpreting the numbers given in the case of inelastic scattering. It has been a long time since capture data were obtained for fissile nuclei and it is exciting to find new efforts are being considered at LANL, CERN and CENBG/IRMM. It was finally

  16. Embedded generation and network management issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This report focuses on the characteristics of power generators that are important to accommodation in a distribution system. Part 1 examines the differences between transmission and distribution systems, and issues such as randomness, diversity, predictability, and controllability associated with accommodation in a distribution system. Part 2 concentrates on technical and operational issues relating to embedded generation, and the possible impact of the New Electricity Trading Arrangements. Commercial issues, contractual relationships for network charging and provision of services, and possible ways forward are examined in the last three parts of the report.

  17. Rib fracture repair: indications, technical issues, and future directions.

    Science.gov (United States)

    Nirula, Raminder; Diaz, Jose J; Trunkey, Donald D; Mayberry, John C

    2009-01-01

    Rib fracture repair has been performed at selected centers around the world for more than 50 years; however, the operative indications have not been established and are considered controversial. The outcome of a strictly nonoperative approach may not be optimal. Potential indications for rib fracture repair include flail chest, painful, movable rib fractures refractory to conventional pain management, chest wall deformity/defect, rib fracture nonunion, and during thoracotomy for other traumatic indication. Rib fracture repair is technically challenging secondary to the human rib's relatively thin cortex and its tendency to fracture obliquely. Nonetheless, several effective repair systems have been developed. Future directions for progress on this important surgical problem include the development of minimally invasive techniques and the conduct of multicenter, randomized trials.

  18. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  19. Technical approach document

    International Nuclear Information System (INIS)

    1988-04-01

    This document describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPS standards. This document is a revision to the original document. Major revisions were made to the sections in riprap selection and sizing, and ground-water; only minor revisions were made to the remainder of the document. The US Nuclear Regulatory Commission (NRC) has prepared a Standard Review Plan (NRC-SRP) which describes factors to be considered by the NRC in approving the RAP. Sections 3.0, 4.0, 5.0, and 7.0 of this document are arranged under the same headings as those used in the NRC-SRP. This approach is adopted in order to facilitate joint use of the documents. Section 2.0 (not included in the NRC-SRP) discusses design considerations; Section 3.0 describes surface-water hydrology and erosion control; Section 4.0 describes geotechnical aspects of pile design; Section 5.0 discusses the Alternate Site Selection Process; Section 6.0 deals with radiological issues (in particular, the design of the radon barrier); Section 7.0 discusses protection of groundwater resources; and Section 8.0 discusses site design criteria for the RAC

  20. Technical writing in America: A historical perspective

    Science.gov (United States)

    Connaughton, M. E.

    1981-01-01

    The standard distinction between poetic and referential language, the gulf between science and the humanities, and the distress many teachers of English feel when faced for the first time with the prospect of teaching technical writing are discussed. In the introduction of many technical writing textbooks. Technical communication is divorced from other forms of linguistic experience by making language limiting and reductive rather than creative and expansive. The emphasis on technical/scientific writing as radically different had blinded people to those traits it has in common with all species of composition and has led to a neglect of research, on fundamental rhetorical issues. A complete rhetorical theory of technical discourse should include information about the attitudes and motives of writers, the situations which motivate (or coerce) them to write, definitive features of technical style and form, interrelationship of expression and creativity, and functions of communication in shaping and preserving scientific networds and institutions. The previous areas should be explored with respect to contemporary practice and within an historical perspective.

  1. An overview of economic and technical issues related to LWR MOX fuel usage

    International Nuclear Information System (INIS)

    Malone, J.P.; Varley, G.; Goldstein, L.

    1999-01-01

    This paper will present comparisons of the economics of MOX versus UO 2 fuels. In addition to the economics of the front end, the scope of the comparison will include the back end of the fuel cycle. Management of spent MOX fuel assemblies presents utilities with some technical issues that can complicate spent fuel pool operation. Alternative spent fuel management methods, such as dry storage of spent MOX fuel assemblies, will also be discussed. Differences in decay heat loads versus time for spent MOX and UO 2 fuel assemblies will be presented. This difference is one of the main problems confronting spent fuel managers relative to MOX. The difference in decay heat loads will serve as the basis for a performance overview of the various spent fuel technologies available today. The economics of the front end of MOX will be presented relative to UO 2 fuel. Availability of MOX manufacturing capability will also be discussed, along with a discussion of its impact on future MOX fabrication prices. The in-core performance of MOX will be compared to that of UO 2 fuel with similar performance characteristics. The information will include highlights of nuclear design and related operational considerations such as: Reactivity reduction with burnup is slower for MOX fuel than for UO 2 fuel; Spectral hardening resulting in lower control rod worths and a lower soluble boron worth; and more negative moderator, void and fuel temperature coefficients. A comparison of Westinghouse and ABB-CE core designs for use on disposition of weapons MOX in 12- and 18-month cycles will be presented. (author)

  2. Ranking of safety issues for WWER-440 model 230 nuclear power plants

    International Nuclear Information System (INIS)

    1992-02-01

    In response to requests from Member States operating Soviet designed WWER-440/230 nuclear power plants (NPPs) for assistance through the IAEA's nuclear safety services, a major international project was established to evaluate these first generation reactors as a complement to relevant ongoing national, bilateral and multilateral activities. The objective is to assist countries operating WWER-440/230 NPPs in performing comprehensive safety reviews aimed at identifying design and operational weaknesses. The scope of the project includes a review of the conceptual design of WWER-440/230 NPPs, safety review missions to each one of the operating reactors to review design and operational aspects and studies to resolve issues of generic safety concern. This report was prepared by a group of international experts and the IAEA staff and discussed by the Project Steering Committee, December 9-13, 1991 in Vienna. An overview of the safety issues identified is presented indicating their effect on the performance of the basic safety functions. Conceptual recommendations related to design issues are given as a technical basis for the safety modifications required

  3. Assessment of the technical viability of reactor options for plutonium disposition

    International Nuclear Information System (INIS)

    Primm, R.T. III.

    1996-01-01

    Various reactor concepts for the disposition of surplus Pu have been proposed by reactor vendors; not all have attained the same level of technical viability. Studies were performed to differentiate between reactor concepts by devising a quantitative index for technical viability. For a quantitative assessment, three issues required resolution: the definition of a technical maturity scale, the treatment of ''subjective'' factors which cannot be easily represented in a quantitative format, and the protocol for producing a single technical viability figure-of-merit for each alternative. Alternatives involving the use of foreign facilities were found to be the most technically viable

  4. Small wind turbines - Technical sheet

    International Nuclear Information System (INIS)

    2015-02-01

    This publication first proposes an overview of the technical context of small wind turbines (from less than 1 kW to 36 kW). It discusses issues related to mast height, indicates the various technologies in terms of machine geometry (vertical or horizontal axis), of mast and foundations, of mechanism of orientation with respect to the wind. It also outlines that power curves are not always reliable due to a lack of maturity of techniques and technologies. Other issues are discussed: wind characteristics, and the assessment of the national potential source. The next parts address the regulatory and economic context, environmental impacts (limited impact on landscape, noise), propose an overview of actors and market (supply and demand of small wind turbines in the USA and in France, actors involved in the chain value in France), and give some recommendations for the development of small wind turbines in France. The last part proposes a technical focus on self-consumption by professional in rural areas (production and consumption in farms)

  5. Magnetic Fusion Energy Plasma Interactive and High Heat Flux Components: Volume 5, Technical assessment of critical issues in the steady state operation of fusion confinement devices

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    Critical issues for the steady state operation of plasma confinement devices exist in both the physics and technology fields of fusion research. Due to the wide range and number of these issues, this technical assessment has focused on the crucial issues associated with the plasma physics and the plasma interactive components. The document provides information on the problem areas that affect the design and operation of a steady state ETR or ITER type confinement device. It discusses both tokamaks and alternative concepts, and provides a survey of existing and planned confinement machines and laboratory facilities that can address the identified issues. A universal definition of steady state operation is difficult to obtain. From a physics point of view, steady state is generally achieved when the time derivatives approach zero and the operation time greatly exceeds the characteristic time constants of the device. Steady state operation for materials depends on whether thermal stress, creep, fatigue, radiation damage, or power removal are being discussed. For erosion issues, the fluence and availability of the machine for continuous operation are important, assuming that transient events such as disruptions do not limit the component lifetimes. The panel suggests, in general terms, that steady state requires plasma operation from 100 to 1000 seconds and an availability of more than a few percent, which is similar to the expectations for an ETR type device. The assessment of critical issues for steady state operation is divided into four sections: physics issues; technology issues; issues in alternative concepts; and devices and laboratory facilities that can address these problems.

  6. Magnetic Fusion Energy Plasma Interactive and High Heat Flux Components: Volume 5, Technical assessment of critical issues in the steady state operation of fusion confinement devices

    International Nuclear Information System (INIS)

    1988-01-01

    Critical issues for the steady state operation of plasma confinement devices exist in both the physics and technology fields of fusion research. Due to the wide range and number of these issues, this technical assessment has focused on the crucial issues associated with the plasma physics and the plasma interactive components. The document provides information on the problem areas that affect the design and operation of a steady state ETR or ITER type confinement device. It discusses both tokamaks and alternative concepts, and provides a survey of existing and planned confinement machines and laboratory facilities that can address the identified issues. A universal definition of steady state operation is difficult to obtain. From a physics point of view, steady state is generally achieved when the time derivatives approach zero and the operation time greatly exceeds the characteristic time constants of the device. Steady state operation for materials depends on whether thermal stress, creep, fatigue, radiation damage, or power removal are being discussed. For erosion issues, the fluence and availability of the machine for continuous operation are important, assuming that transient events such as disruptions do not limit the component lifetimes. The panel suggests, in general terms, that steady state requires plasma operation from 100 to 1000 seconds and an availability of more than a few percent, which is similar to the expectations for an ETR type device. The assessment of critical issues for steady state operation is divided into four sections: physics issues; technology issues; issues in alternative concepts; and devices and laboratory facilities that can address these problems

  7. 78 FR 39284 - Technical Guidance for Assessing Environmental Justice in Regulatory Analysis

    Science.gov (United States)

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OA-2013-0320; FRL-9830-1] Technical Guidance for Assessing Environmental Justice in Regulatory Analysis AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... Environmental Protection Agency (EPA) issued for public comment a document entitled, ``Technical Guidance for...

  8. Practical boundary surveying legal and technical principles

    CERN Document Server

    Gay, Paul

    2015-01-01

    This guide to boundary surveying provides landowners, land surveyors, students and others with the necessary foundation to understand boundary surveying techniques and the common legal issues that govern boundary establishment.  Boundary surveying is sometimes mistakenly considered a strictly technical discipline with simple and straightforward technical solutions.  In reality, boundary establishment is often a difficult and complex matter, requiring years of experience and a thorough understanding of boundary law.  This book helps readers to understand the challenges often encountered by boundary surveyors and some of the available solutions. Using only simple and logically explained mathematics, the principles and practice of boundary surveying are demystified for those without prior experience, and the focused coverage of pivotal issues such as easements and setting lot corners will aid even licensed practitioners in untangling thorny cases. Practical advice on using both basic and advanced instruments ...

  9. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  10. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  11. Stockholm international conference 2003 on geological repositories: Political and technical progress

    International Nuclear Information System (INIS)

    2004-01-01

    The conference reviewed global progress made as well as current perspectives on the activities to develop geologic repositories. The objectives were to review the progress in policy making as well as technical issues and to strengthen international co-operation on waste management and disposal issues. The first day of the conference addressed the policy aspects of geological repositories and the second day featured the more technical issues. Session 1: International progress in performing long-term safety studies and security of geological disposal were discussed and reviewed with examples from OECD/NEA, Belgium, Sweden, USA, Switzerland and Russia. Session 2: Views on stakeholder involvement and decision making process were presented by international organisations and national implementers from Japan, United Kingdom, Belgium and OECD/NEA. Session 3: Views on stakeholder involvement and decision making process were presented by regional and local stakeholders from France, Finland, Korea and Sweden. Session 4: International instruments assisting in the implementation of geological repositories were discussed, for example ICRP and IAEA/NEA safety documents, Joint Convention, Safeguard agreements, Nuclear Liability Conventions, etc. Session 5: The contribution of Research, Development and Demonstration was discussed with overviews of the progress achieved on scientific and technical issues over the past four years. Progress and key issues were presented from Switzerland, USA, Finland, Japan, Sweden and IAEA. Each of the papers and poster presentations have been analysed and indexed separately

  12. Problems in Communication between Businesses and Technical Education System

    Directory of Open Access Journals (Sweden)

    Szafrański Maciej

    2017-06-01

    Full Text Available This paper presents how some communication problems between business and Technical Education System (TES can be reduced. This comes to a misunderstanding of the needs of entrepreneurs for the knowledge and skills, in this paper treated as a resource on the market. The authors explain why debated issue falls in the area of corporate management. It identifies one of the reasons hindering the solution of problems. In order to clarify the issues it references the achievements of analytic philosophy of language and the theory of communication code. It proposed a method of facilitating the solution of the problem, which is being implemented since 2016 by the research team, co-created by the authors of this publication. The aim of the development of this publication is to supplement the theoretical and practical knowledge of management in manufacturing companies and others with high technical potential, where there is a large, growing and rapidly changing demand for knowledge and technical skills.

  13. Competency-Based Business Degree. Issue Brief

    Science.gov (United States)

    Washington State Board for Community and Technical Colleges, 2014

    2014-01-01

    In January 2015, thirteen Washington community colleges launched an online, competency-based business transfer degree--the first in the state's community and technical college system. This issue brief provides answers to commonly asked questions about the new competency-based degree.

  14. Critical issues in mathematics education major contributions of Alan Bishop

    CERN Document Server

    Presmeg, Norma C; Presmeg, Norma C

    2008-01-01

    Here are presented the contributions of Professor Alan Bishop within the mathematics education research community. Six critical issues in the development of mathematics education research are reviewed and the current developments in each area are discussed.

  15. Career and Technical Education's Role in Rural Education. Issue Sheet

    Science.gov (United States)

    Association for Career and Technical Education (ACTE), 2015

    2015-01-01

    Technical, academic and employability knowledge and skills are essential for youth and adults to be lifelong learners, informed citizens and prepared and adaptable members of the workforce. CTE imparts these skills through engaging, relevant hands-on learning, integrated with academics, for all students, including those living in rural settings…

  16. GLOBAL 2009: Closing speech - the bulk of technical sessions

    International Nuclear Information System (INIS)

    Greneche, D.

    2009-01-01

    The author proposes an overview of the content of the hundred technical sessions of the GLOBAL 2009 conference. Thus, he addresses the twelve main issues: the upstream part of the fuel cycle, the present status of used fuel recycling, the waste management strategies and technologies, the transportation and storage of used fuels and radioactive materials, the definitive storage of nuclear wastes, the new technologies for fuel recycling, advanced designs of reactor cores and fuel management, long life radionuclide transmutation systems, the non proliferation issue, material management and options for sustainable fuel cycles, dismantling, decommissioning and resulting material management, transverse topics (technical-economic studies, nuclear energy applications other than electricity production, challenges of sustainable development of nuclear energy, advanced researches)

  17. Assessment and management of ageing of major nuclear power plant components important to safety: CANDU reactor assemblies

    International Nuclear Information System (INIS)

    2001-02-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance, design or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must therefore be effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wearout of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness for service) and the inspection, monitoring, and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs) including the Soviet designed water moderated and water cooled energy reactors (WWERs), are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age-related licensing issues. Since the reports are written from a safety perspective, they do not address life or life-cycle management of the plant components, which

  18. Assessment and Management of ageing of major nuclear power plant components important to safety: PWR pressure vessels

    International Nuclear Information System (INIS)

    1999-10-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (e.g., caused by unanticipated phenomena and by operating, maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wear-out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), including water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs; and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues. Since the reports are written from a safety perspective, they do not address life or life-cycle management of the plant components, which involves the integration of

  19. Assessment and management of ageing of major nuclear power plant components important to safety: BWR pressure vessels

    International Nuclear Information System (INIS)

    2005-10-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (caused for instance by unanticipated phenomena and by operating, maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling, within acceptable limits, the ageing degradation and wear out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. Since the reports are written from a safety perspective, they do not address life or life cycle management of plant components, which involves economic considerations. The current practices for the assessment of safety margins (fitness for service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), and water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues

  20. Identifying and training non-technical skills of nuclear emergency response teams

    International Nuclear Information System (INIS)

    Crichton, M.T.; Flin, R.

    2004-01-01

    Training of the non-technical (social and cognitive) skills that are crucial to safe and effective management by teams in emergency situations is an issue that is receiving increasing emphasis in many organisations, particularly in the nuclear power industry. As teams play a major role in emergency response organisations (ERO), effective functioning and interactions within, between and across teams is crucial, particularly as the management of an emergency situation often requires that teams are extended by members from various other sections and strategic groups throughout the company, as well as members of external agencies. A series of interviews was recently conducted with members of a UK nuclear emergency response organisation to identify the non-technical skills required by team members that would be required for managing an emergency. Critical skills have been identified as decision making and situation assessment, as well as communication, teamwork, and stress management. A number of training strategies are discussed which can be tailored to the roles and responsibilities of the team members and the team leader, based on the roles within the team being defined as either Decision Maker, Evaluator, or Implementor, according to Nuclear Energy Institute (NEI) classifications. It is anticipated that enhanced learning of the necessary non-technical skills, through experience and directed practice, will improve the skills of members of emergency response teams

  1. Identifying and training non-technical skills of nuclear emergency response teams

    Energy Technology Data Exchange (ETDEWEB)

    Crichton, M.T. E-mail: m.crichton@abdn.ac.uk; Flin, R

    2004-08-01

    Training of the non-technical (social and cognitive) skills that are crucial to safe and effective management by teams in emergency situations is an issue that is receiving increasing emphasis in many organisations, particularly in the nuclear power industry. As teams play a major role in emergency response organisations (ERO), effective functioning and interactions within, between and across teams is crucial, particularly as the management of an emergency situation often requires that teams are extended by members from various other sections and strategic groups throughout the company, as well as members of external agencies. A series of interviews was recently conducted with members of a UK nuclear emergency response organisation to identify the non-technical skills required by team members that would be required for managing an emergency. Critical skills have been identified as decision making and situation assessment, as well as communication, teamwork, and stress management. A number of training strategies are discussed which can be tailored to the roles and responsibilities of the team members and the team leader, based on the roles within the team being defined as either Decision Maker, Evaluator, or Implementor, according to Nuclear Energy Institute (NEI) classifications. It is anticipated that enhanced learning of the necessary non-technical skills, through experience and directed practice, will improve the skills of members of emergency response teams.

  2. Regulatory and technical reports (abstract index journal)

    International Nuclear Information System (INIS)

    1994-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  3. Plutonium: key issue in nuclear disarmament and non-proliferation of nuclear weapons

    International Nuclear Information System (INIS)

    Yoshisaki, M.B.

    1993-01-01

    The technical report is a 1993 update on weapons-grade plutonium, a key issue in nuclear disarmament. Its vital significance would again be discussed during the fifth and the last Review Conference on the Non-Proliferation Treaty (NPT) for Nuclear Weapons which would end in 1995. Member States shall decide whether an indefinite or conditional extension of NPT is necessary for world peace and international security. Two Non-NPT States, Russia and U.S.A. are in the forefront working for the reduction of nuclear weapons through nuclear disarmament. Their major effort is focused on the implementation of the Strategic Arms Reduction Treaty I and II or START I and II for world peace. The eventual implementation of START I and II would lead to the dismantling of plutonium from nuclear warheads proposed to be eliminated by both countries. This report gives three technical options to be derived from nuclear disarmament issues for the non-proliferation of nuclear weapons: (a) indefinite storage - there is no guarantee that these will not be used in the future (b) disposal as wastes - possible only in principle, because of lack of experience in mixing plutonium with high level wastes, and (c) source of energy - best option in managing stored weapons materials, because it satisfies non-proliferation objectives. It means fuel for energy in Light Water Reactors (LWR) or Fast Breeder Reactors (FBR). (author). 8 refs

  4. RNA-seq: technical variability and sampling

    Science.gov (United States)

    2011-01-01

    Background RNA-seq is revolutionizing the way we study transcriptomes. mRNA can be surveyed without prior knowledge of gene transcripts. Alternative splicing of transcript isoforms and the identification of previously unknown exons are being reported. Initial reports of differences in exon usage, and splicing between samples as well as quantitative differences among samples are beginning to surface. Biological variation has been reported to be larger than technical variation. In addition, technical variation has been reported to be in line with expectations due to random sampling. However, strategies for dealing with technical variation will differ depending on the magnitude. The size of technical variance, and the role of sampling are examined in this manuscript. Results In this study three independent Solexa/Illumina experiments containing technical replicates are analyzed. When coverage is low, large disagreements between technical replicates are apparent. Exon detection between technical replicates is highly variable when the coverage is less than 5 reads per nucleotide and estimates of gene expression are more likely to disagree when coverage is low. Although large disagreements in the estimates of expression are observed at all levels of coverage. Conclusions Technical variability is too high to ignore. Technical variability results in inconsistent detection of exons at low levels of coverage. Further, the estimate of the relative abundance of a transcript can substantially disagree, even when coverage levels are high. This may be due to the low sampling fraction and if so, it will persist as an issue needing to be addressed in experimental design even as the next wave of technology produces larger numbers of reads. We provide practical recommendations for dealing with the technical variability, without dramatic cost increases. PMID:21645359

  5. Minutes of the IFMIF technical meeting

    International Nuclear Information System (INIS)

    Nakamura, H.; Takeda, M.; Ida, M.; Maebara, S.; Yutani, T.; Sugimoto, M.

    2004-03-01

    The IFMIF Technical Meeting was held on December 4-5, 2003 at Shiran-kaikan, Kyoto University. The main objectives are 1) to finalize the Comprehensive Design Report (CDR), 2) to discuss IFMIF cost and organization, 3) to review technical status of major systems, transition phase activities and EVEDA plan. This report presents a brief summary of the results of the meeting. Agenda, participants list and presentation materials are attached as Appendix. (author)

  6. Intellectual property issues in holography and high tech

    Science.gov (United States)

    Reingand, Nadya

    2004-06-01

    The author with technical education background (Ph.D. in holography) shares her 3+ years of experience working on intellectual property (IP) issues that includes patents, trademarks, and copyrights. A special attention is paid to the patent issues: the application procedure, the patent requirements, the databases for prior art search, how to make the cost efficient filing.

  7. 75 FR 62534 - Reliability Monitoring, Enforcement and Compliance Issues; Notice of Technical Conference

    Science.gov (United States)

    2010-10-12

    ... Energy Regulatory Commission (Commission) will hold a Commissioner-led Technical Conference in the above... available through http://www.ferc.gov . Anyone with Internet access who desires to listen to this event can...

  8. Technical cooperation with Central and Eastern European countries with special focus on engineering aspects of lifetime optimisation

    International Nuclear Information System (INIS)

    Trampus, P.

    2002-01-01

    A regional Technical Cooperation project for Central and Eastern European countries was established and funded by the IAEA as a response to the region's need. Majority of these countries are now in the process of establishing/strengthening their infrastructure for assessment of structural integrity of primary circuit components for an appropriate level of safety and reliability. Moreover, extension of the operational life of the WWER nuclear power plants (NPPs) became part of the generation strategy in most of these countries. The overall objective of the project is to improve long term integrity of primary circuit components as a fundamental technical prerequisite to ensure plant operation until and beyond the design lifetime. In a series of workshops and technical meetings issues relevant to primary circuit component structural integrity with special regard to operational life optimization have been being addressed. The works under the project are coordinated with the European Commission's integrity related assistance projects, and some of the activities are jointly organized with the WANO Moscow Center. Main conclusions of the central topics are summarized in this paper

  9. TWRS vadose zone contamination issue expert panel report

    Energy Technology Data Exchange (ETDEWEB)

    Shafer, D.S.

    1997-05-01

    When members were first canvassed for participation in the Vadose Zone Expert Panel the stated purpose for convening the Panel was to review a controversial draft report, the SX Tank Farm Report. This report was produced by a DOE Grand Junction Project Office (GJPO) contractor, RUST Geotech, now MACTEC-ERS, for the DOE Richland Office (DOERL). Three meetings were planned for June, July and August, 1995 to review the draft report and to complete a Panel report by mid-September. The Expert Panel has found its efforts confounded by various non-technical issues. The Expert Panel has chosen to address some of the non-technical issues in this Preface rather than to dilute the technical discussion that follows in the body of this independent expert panel status report (Panel Report). Rather than performing a straightforward manuscript review, the Panel was asked to resolve conflicting interpretations of gamma-ray logging measurements performed in vadose zone boreholes (drywells) surrounding the high-level radioactive wastes of the SX tank farm. There are numerous and complex technical issues that must be evaluated before the vertical and radial extent of contaminant migration at the SX tank farm can be accurately assessed. When the Panel first met in early June, 1996, it quickly became apparent that the scientific and technical issues were obscured by policy and institutional affairs which have polarized discussion among various segments of the Hanford organization. This situation reflects the kinds of institutional problems described separately in reports by the National Research Council of the National Academy of Sciences (NAS/NRC), The Hanford Tanks Environmental Impacts and Policy Choices and BmTiers to Science: Technical Management of the Department of Energy Environmental Remediation Program. The Vadose Zone Characterization Program, appears to be caught between conflicting pressures and organizational mandates, some imposed from outside DOE-RL and some self

  10. Tactical and operational response to major incidents: feasibility and reliability of skills assessment using novel virtual environments.

    Science.gov (United States)

    Cohen, Daniel; Sevdalis, Nick; Patel, Vishal; Taylor, Michael; Lee, Henry; Vokes, Mick; Heys, Mick; Taylor, David; Batrick, Nicola; Darzi, Ara

    2013-07-01

    To determine feasibility and reliability of skills assessment in a multi-agency, triple-site major incident response exercise carried out in a virtual world environment. Skills assessment was carried out across three scenarios. The pre-hospital scenario required paramedics to triage and treat casualties at the site of an explosion. Technical skills assessment forms were developed using training syllabus competencies and national guidelines identified by pre-hospital response experts. Non-technical skills were assessed using a seven-point scale previously developed for use by pre-hospital paramedics. The two in-hospital scenarios, focusing on a trauma team leader and a silver/clinical major incident co-ordinator, utilised the validated Trauma-NOTECHS scale to assess five domains of performance. Technical competencies were assessed using an ATLS-style competency scale for the trauma scenario. For the silver scenario, the assessment document was developed using competencies described from a similar role description in a real-life hospital major incident plan. The technical and non-technical performance of all participants was assessed live by two experts in each of the three scenarios and inter-assessor reliability was computed. Participants also self-assessed their performance using identical proformas immediately after the scenarios were completed. Self and expert assessments were correlated (assessment cross-validation). Twenty-three participants underwent all scenarios and assessments. Performance assessments were feasible for both experts as well as the participants. Non-technical performance was generally scored higher than technical performance. Very good inter-rater reliability was obtained between expert raters across all scenarios and both technical and non-technical aspects of performance (reliability range 0.59-0.90, Psassessment in technical skills across all three scenarios (correlation range 0.52-0.84, Psskills. This study establishes feasibility and

  11. Unresolved safety issues summary. Volume 3, Number 3. Aqua book

    International Nuclear Information System (INIS)

    1981-01-01

    The 'Unresolved Safety Issues' summary is designed to provide the management of the Nuclear Regulatory Commission with a quarterly overview of the progress and plans for completion of generic tasks addressing Unresolved Safety Issues reported to Congress pursuant to section 210 of The Energy Reorganization Act of 1974 as amended. This summary utilizes data collected from the Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, and the National Laboratories and is prepared by the office of Management and Program Analysis. The definition of what constitutes completion of an unresolved safety issue (USI) has recently been expanded to include the implementation of the technical resolution. This is in acknowledgement of the fact that real safety benefits occur only after the implementation has taken place. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The schedule for implementation will not normally be included in the task action plan(s) for the resolution of a USI since the nature and extent of the activities necessary to accomplish the implementation cannot normally be reasonably determined prior to the determination of a technical resolution. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  12. Trust in technology a socio-technical perspective

    CERN Document Server

    Clarke, Karen; Rouncefield, Mark

    2006-01-01

    Encapsulates work done in the DIRC project (Interdisciplinary Research Collaboration in Dependability), bringing together a range of disciplinary approaches - computer science, sociology and software engineering - to produce a socio-technical systems perspective on the issues surrounding trust in technology in complex settings.

  13. Technical aspects of pediatric epilepsy surgery: Report of a multicenter, multinational web-based survey by the ILAE Task Force on Pediatric Epilepsy Surgery.

    Science.gov (United States)

    Cukiert, Arthur; Rydenhag, Bertil; Harkness, William; Cross, J Helen; Gaillard, William D

    2016-02-01

    Surgical techniques may vary extensively between centers. We report on a web-based survey aimed at evaluating the current technical approaches in different centers around the world performing epilepsy surgery in children. The intention of the survey was to establish technical standards. A request was made to 88 centers to complete a web-based survey comprising 51 questions. There were 14 questions related to general issues, 13 questions investigating the different technical aspects for children undergoing epilepsy surgery, and 24 questions investigating surgical strategies in pediatric epilepsy surgery. Fifty-two centers covering a wide geographic representation completed the questionnaire. The median number of resective procedures per center per year was 47. Some important technical practices appeared (>80% of the responses) such as the use of prophylactic antibiotics (98%), the use of high-speed drills for bone opening (88%), nonresorbable material for bone flap closure (85%), head fixation (90%), use of the surgical microscope (100%), and of free bone flaps. Other questions, such as the use of drains, electrocorticography (ECoG) and preoperative withdrawal of valproate, led to mixed, inconclusive results. Complications were noted in 3.8% of the patients submitted to cortical resection, 9.9% hemispheric surgery, 5% callosotomy, 1.8% depth electrode implantation, 5.9% subdural grids implantation, 11.9% hypothalamic hamartoma resection, 0.9% vagus nerve stimulation (VNS), and 0.5% deep brain stimulation. There were no major differences across regions or countries in any of the subitems above. The present data offer the first overview of the technical aspects of pediatric epilepsy surgery worldwide. Surprisingly, there seem to be more similarities than differences. That aside many of the evaluated issues should be examined by adequately designed multicenter randomized controlled trials (RCTs). Further knowledge on these technical issues might lead to increased

  14. Integrated risk - healthy technical conscience

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, P. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

    2015-07-01

    The personal obligation leaders and individuals internalize and exercise to ensure plant operation, maintenance, and engineering activities are conducted in a manner consistent with plant design, emergency response strategies, technical requirements and that preserve operating, design and safety margins. Technical errors are increasing, both in number and significance. Causes are common at many utilities. The majority of these engineering human performance weaknesses have not had immediate impact on station reliability and safety (not self-revealing). In some recent projects, the same weaknesses affected a station's viability.

  15. Technical, environmental, and socioeconomic factors associated with dry-cooled nuclear energy centers

    International Nuclear Information System (INIS)

    1976-04-01

    The report includes a review of the current state-of-the-art of dry-cooling technology for industrial and power-generating facilities and an evaluation of its technical potential and cost for large nuclear power plants. Criteria are formulated for coarse screening of the arid regions of the Western United States to select a surrogate site for more detailed site-specific analyses. The screening criteria included seismic considerations, existing transportation facilities, institutional and jurisdictional constraints, waste heat dissipation effects, water requirements, and ecologic and socioeconomic considerations. The Galt site near Las Vegas, Nevada was selected for the surrogate site analysis to assess important issues related to the construction and operation of twelve dry-cooled nuclear power plants at an arid location remote from major load centers. The assessment covers geotechnical, atmospheric and hydrologic considerations, special aspects of transporting large equipment overland to the site from seaports, analyses of potential transmission routes to major load centers, local institutional and taxing provisions, and ecologic and socioeconomic impacts

  16. Technical, environmental, and socioeconomic factors associated with dry-cooled nuclear energy centers

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-01

    The report includes a review of the current state-of-the-art of dry-cooling technology for industrial and power-generating facilities and an evaluation of its technical potential and cost for large nuclear power plants. Criteria are formulated for coarse screening of the arid regions of the Western United States to select a surrogate site for more detailed site-specific analyses. The screening criteria included seismic considerations, existing transportation facilities, institutional and jurisdictional constraints, waste heat dissipation effects, water requirements, and ecologic and socioeconomic considerations. The Galt site near Las Vegas, Nevada was selected for the surrogate site analysis to assess important issues related to the construction and operation of twelve dry-cooled nuclear power plants at an arid location remote from major load centers. The assessment covers geotechnical, atmospheric and hydrologic considerations, special aspects of transporting large equipment overland to the site from seaports, analyses of potential transmission routes to major load centers, local institutional and taxing provisions, and ecologic and socioeconomic impacts.

  17. Materials issues in cask development

    International Nuclear Information System (INIS)

    Chapman, R.L.; Sorensen, K.B.

    1987-01-01

    This paper identifies potential new materials as a function of their use in the cask. To the extent that identified materials are not yet qualified for their intended application, this paper identifies probable technical issues and development efforts that may be required to qualify the materials for use in transportation casks. 1 tab

  18. Palisades technical specification conversion from custom to new industry standard

    International Nuclear Information System (INIS)

    Foley, D.J.; Young, B.

    1990-01-01

    Consumers Power Company's (CPCo) Palisades plant is in the process of converting from custom technical specifications to the new industry standard, Restructured Standard Technical Specifications (RSTS). Custom technical specifications were the precursor to standard technical specifications, being issued to plants built prior to 1972. In May 1989, each of the four light water reactor owners' groups completed topical reports presenting their version of Restructured Standard Technical Specifications to the Nuclear Regulatory Commission (NRC). After approval of the owners' groups versions of the RSTs by the NRC, individual operating reactors will begin to make the conversion to the RSTS. Each owners' group has designated a lead plant, which will be the first of that vendor type to convert. All of the lead plants currently operate under standard technical specifications. The content of the RSTS was determined by comparing the standard technical specifications with selection criteria specified in the Commissions Interim Policy Statement

  19. Bibliography of Lewis Research Center Technical Publications announced in 1991

    Science.gov (United States)

    1992-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific engineering work performed and managed by the Lewis Research Center in 1991. All the publications were announced in the 1991 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  20. Food irradiation. Technical and legal aspects

    International Nuclear Information System (INIS)

    Vas, K.

    1978-01-01

    This document presents a brief technical discussion on a new major technique for food preservation and points out the necessary harmonization of national regulations to give them a broader application field [fr

  1. Issues for reuse of gloveboxes at LANL TA-55

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.; Pinson, P.A.; Miller, C.F.

    1998-08-01

    This report is a summary of issues that face plutonium glovebox designers and users at the Los Alamos National Laboratory (LANL) Technical Area 55 (TA-55). Characterizing the issues is a step in the task of enhancing the next generation glovebox design to minimize waste streams while providing the other design functions. This report gives an initial assessment of eight important design and operation issues that can benefit from waste minimization.

  2. Issues for reuse of gloveboxes at LANL TA-55

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Pinson, P.A.; Miller, C.F.

    1998-08-01

    This report is a summary of issues that face plutonium glovebox designers and users at the Los Alamos National Laboratory (LANL) Technical Area 55 (TA-55). Characterizing the issues is a step in the task of enhancing the next generation glovebox design to minimize waste streams while providing the other design functions. This report gives an initial assessment of eight important design and operation issues that can benefit from waste minimization

  3. Technical writing versus technical writing

    Science.gov (United States)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  4. Definition of containment issues

    International Nuclear Information System (INIS)

    Walker, D.H.

    1982-01-01

    Public Law 96-567 Nuclear Safety Research, Development and Demonstration Act of 1980, directed the US Department of Energy (DOE) to provide an accelerated and coordinated program for developing practical generic improvements that would enhance the capability for safe, reliable and economical operation of Light Water Nuclear Reactor Power Stations. The DOE approach to defining such a program will consist of two phases, (1) definition of program requirements and (2) implementation of the program plan. This paper summarizes the results of the program definition phase for the containment integrity function. The definition phase effort was carried out by two groups of knowledgeable technical experts from the nuclear industry, one of which addressed containment integrity. Tabulated in the paper are the issues identified by the working groups and their associated priorities. Also tabulated are those high priority issues for which ongoing programs do not appear to provide sufficient information to resolve the issue. The results of this review show that existing programs to a great extent address existing issues in a manner such that the issues should be resolved by the programs

  5. Independent Technical (open-quotes Red Teamclose quotes) Reviews

    International Nuclear Information System (INIS)

    Thullen, P.; Bennett, D.R.; Kosiewicz, S.T.; Weaver, D.L.

    1995-01-01

    Offices under the Assistant Secretary for Environmental Restoration and Waste Management (EM) in the Department of Energy (DOE) and some National Laboratories are using Independent Technical or open-quotes Red Teamclose quotes Reviews to understand and improve the performance of major projects, major system acquisitions, programs and organizations. A core group formed in 1991 by Los Alamos National Laboratory and Sandia National Laboratories, has organized teams of commercial and private consultants to perform over fifteen Independent Technical Reviews (ITRs) throughout the DOE Complex. This paper discusses: review initiation, team formation, methodology, site response, and observations gathered over the past three years

  6. Sustainable network of independent technical expertise for radioactive waste disposal (SITEX)

    Energy Technology Data Exchange (ETDEWEB)

    Serres, Christophe; Rocher, Muriel [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Bernier, Frederic [FANC, Brussels (Belgium); Havlova, Vaclava [UJV Rez, a.s., Rez (Czech Republic); Mrskova, Adela [DECOM A.S., Trnava (Slovakia); Dubreuil, Gilles Heriard [MUTADIS, Paris (France)

    2013-07-01

    SITEX is a 24 months FP7 Euratom project (from January 2012 to December 2013) led by IRSN and bringing together organisations representing technical safety organisations and nuclear safety authorities performing technical and scientific assessment of geological disposals for radioactive waste in the framework of their respective national regulatory review process of the safety case. Civil society outreach specialists of interaction with civil society are also involved in the project. SITEX aims at establishing the conditions required for developing sustainable interactions among experts from various horizons (nuclear safety authorities, technical safety organisations, civil society organisations..) capable of developing and coordinating joint and harmonized activities in relation with the safety assessment of the safety case. Among foreseen activities, partnership with the civil society experts is considered as a key function of the future network in order to contribute in enhancing trust in the decision making process. The SITEX program of work is split into a set of six workpackages that address technical and organizational issues allowing in fine to propose a structure of the activities and operating modes of the future network. These issues relate on the one hand to the study of the potential for sharing and developing technical expertise practices independently from the expertise developed by waste management organisations, on the other hand on the ability to implement coordinated R and D programs run by technical safety organisations in order to develop the scientific knowledge necessary to perform technical assessments. (orig.)

  7. Assessment and management of ageing of major nuclear power plant components important to safety: BWR pressure vessel internals

    International Nuclear Information System (INIS)

    2005-10-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (caused for instance by unanticipated phenomena and by operating maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling, within acceptable limits, the ageing degradation and ware out of components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of guidance reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. Since the reports are written from a safety perspective, they do not address life or life cycle management of plant components, which involves economic considerations. The current practices for the assessment of safety margins (fitness for service) and the inspection, monitoring and mitigation of ageing degradation of selected components of heavy water moderated reactors (HWRs), boiling water reactors (BWRs), pressurized water reactors (PWRs), and water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues

  8. Designing Second Language Performance Assessments. Technical Report.

    Science.gov (United States)

    Norris, John M.; Brown, James Dean; Hudson, Thom; Yoshioka, Jim

    This technical report focuses on the decision-making potential provided by second language performance assessments. First, performance assessment is situated within the broader discussion of alternatives in language assessment and in educational assessment in general. Next, issues in performance assessment design, implementation, reliability, and…

  9. Cable Television: Technical Considerations in Franchising Major Market Systems.

    Science.gov (United States)

    Pilnick, Carl

    The 1972 Federal Communications Commission's (FCC) regulations on cable television were intended to assist the penetration of cable television into the large metropolitan regions of the United States. In these major market areas, the task for developing an appropriate franchise is complicated by the changing functional nature of the cable systems…

  10. The 1996 meeting of the national technical workgroup on mixed waste thermal treatment

    International Nuclear Information System (INIS)

    1996-01-01

    The National Technical Workgroup on Mixed Waste Thermal Treatment held its annual meeting in Atlanta Georgia on March 12-14, 1996. The National Technical Workgroup (NTW) and this meeting were sponsored under an interagency agreement between EPA and DOE. The 1996 Annual Meeting was hosted by US DOE Oak Ridge Operations in conjunction with Lockheed Martin Energy Systems - Center for Waste Management. A new feature of the annual meeting was the Permit Writer Panel Session which provided an opportunity for the state and federal permit writers to discuss issues and potential solutions to permitting mixed waste treatment systems. In addition, there was substantial discussion on the impacts of the Waste Combustion Performance Standards on mixed waste thermal treatment which are expected to proposed very soon. The 1996 meeting also focussed on two draft technical resource documents produced by NTW on Waste Analysis Plans and Compliance Test Procedures. Issues discussed included public involvement, waste characterization, and emission issues

  11. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  12. Web Archiving: Issues and Problems in Collection Building and Access

    Directory of Open Access Journals (Sweden)

    Grethe Jacobsen

    2008-12-01

    Full Text Available Denmark began web archiving in 2005 and the experiences are presented with a specific focus on collection-building and issues concerning access. In creating principles for what internet materials to collect for a national collection, one can in many ways build on existing practice and guidelines. The actual collection requires strategies for harvesting relevant segments of the internet in order to assure as complete a coverage as possible. Rethinking is also necessary when it comes to the issue of description, but cataloguing expertise can be utilised to find new ways for users to retrieve information. Technical problems in harvesting and archiving are identifiable and can be solved through international cooperation. Access to the archived materials, on the other hand, has become the major challenge to national libraries. Legal obstacles prevent national libraries from offering generel access to their archived internet materials. In Europe the principal obstacles are the EU Directive on Data Protection (Directive 95/46/EC and local data protection legislation based on this directive. LIBER is urged to take political action on this issue in order that the general public may have the same access to the collection of internet materials as it has to other national collections.

  13. Uranium and nuclear issues

    International Nuclear Information System (INIS)

    1983-01-01

    This seminar focussed on the major issues affecting the future of the entire nuclear fuel cycle. In particular it covered issues bearing on the formation of public policy in relation to the use of uranium as an energy source: economic risk, industrial risks, health effects, site selection, environmental issues, and public acceptance

  14. Exploring Pair Programming Benefits for MIS Majors

    Directory of Open Access Journals (Sweden)

    April H. Reed

    2016-12-01

    Full Text Available Pair programming is a collaborative programming practice that places participants in dyads, working in tandem at one computer to complete programming assignments. Pair programming studies with Computer Science (CS and Software Engineering (SE majors have identified benefits such as technical productivity, program/design quality, academic performance, and increased satisfaction for their participants. In this paper, pair programming is studied with Management Information Systems (MIS majors, who (unlike CS and SE majors taking several programming courses typically take only one programming course and often struggle to develop advanced programming skills within that single course. The researchers conducted two pair programming experiments in an introductory software development course for MIS majors over three semesters to determine if pair programming could enhance learning for MIS students. The program results, researchers’ direct observations, and participants’ responses to a survey questionnaire were analyzed after each experiment. The results indicate that pair programming appears to be beneficial to MIS students’ technical productivity and program design quality, specifically the ability to create programs using high-level concepts. Additionally, results confirmed increased student satisfaction and reduced frustration, as the pairs worked collaboratively to produce a program while actively communicating and enjoying the process.

  15. The challenge of the future. Technical progress and ecological perspectives

    International Nuclear Information System (INIS)

    Jischa, M.F.

    1993-01-01

    The book introduces readers into the interrelated global problems population dynamics, energy supply, imminent climate catastrophe, environmetal pollution, finite resources and the conflict between the North and South. It encourages probing more deeply into the technical challenges of the future. The author demonstrates why economic and technical issues will soon be outstripped by questions of the environmental, human and social compatibility of new technologies. (orig./UA) [de

  16. Bibliography of Lewis Research Center technical publications announced in 1990

    Science.gov (United States)

    1991-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1990. All the publications were announced in the 1990 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  17. Bibliography of Lewis Research Center technical publications announced in 1992

    Science.gov (United States)

    1993-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1992. All the publications were announced in the 1992 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  18. Bibliography of Lewis Research Center technical publications announced in 1993

    Science.gov (United States)

    1994-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1993. All the publications were announced in the 1993 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  19. Bibliography of Lewis Research Center technical publications announced in 1989

    Science.gov (United States)

    1990-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1989. All the publications were announced in the 1989 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  20. Technical viability and development needs for waste forms and facilities

    Energy Technology Data Exchange (ETDEWEB)

    Pegg, I.; Gould, T.

    1996-05-01

    The objective of this breakout session was to provide a forum to discuss technical issues relating to plutonium-bearing waste forms and their disposal facilities. Specific topics for discussion included the technical viability and development needs associated with the waste forms and/or disposal facilities. The expected end result of the session was an in-depth (so far as the limited time would allow) discussion of key issues by the session participants. The session chairs expressed allowance for, and encouragement of, alternative points of view, as well as encouragement for discussion of any relevant topics not addressed in the paper presentations. It was not the intent of this session to recommend or advocate any one technology over another.

  1. Telepresence Robots in Daily Life - Technical Report

    NARCIS (Netherlands)

    van Delden, Robertus Wilhelmus; Bruijnes, Merijn

    Mobile remote presence systems (MRPs) are the logical next step in telepresence, but what are the ethical, social, legal, and technical implications of such systems going into the wide wild world? We explored these potential issues by immersing ourselves in a range of possible applications by

  2. State technical review of the HLNW program and the peer review process

    International Nuclear Information System (INIS)

    Jacob, G.R.

    1986-01-01

    Millions of dollars are being spent on state governments' review of the Department of Energy (DOE) high level waste (HLW) repository program. A significant portion of the review efforts focus on technical issues surrounding the development and installment of HLW disposal technologies. Some view the states' technical review efforts as part of a peer review process. However, this interpretation reveals a misunderstanding of the concept of peer review and the purposes of state technical review

  3. Hydrogen Production Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    The Hydrogen Production Technical Team Roadmap identifies research pathways leading to hydrogen production technologies that produce near-zero net greenhouse gas (GHG) emissions from highly efficient and diverse renewable energy sources. This roadmap focuses on initial development of the technologies, identifies their gaps and barriers, and describes activities by various U.S. Department of Energy (DOE) offices to address the key issues and challenges.

  4. Do You Have Major Depression?

    Science.gov (United States)

    ... of this page please turn Javascript on. Feature: Depression Do You Have Major Depression? Past Issues / Fall 2009 Table of Contents Simple ... member may have major depression. —NIMH Types of Depression Just like other illnesses, such as heart disease, ...

  5. Technical know-how of site descriptive modeling for site characterization - 59089

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Doke, Ryosuke; Niizato, Tadafumi; Yasue, Ken-ichi

    2012-01-01

    The site descriptive model covering the current status of characteristics of geological environment and the site evolution model for estimation of the long-term evolution of site conditions are used to integrate multi-disciplinary investigation results. It is important to evaluate uncertainties in the models, to specify issues regarding the uncertainties and to prioritize the resolution of specified issues, for the planning of site characterization. There is a large quantity of technical know-how in the modeling process. It is important to record the technical know-how with transparency and traceability, since site characterization projects generally need long duration. The transfer of the technical know-how accumulated in the research and development (R and D) phase to the implementation phase is equally important. The aim of this study is to support the planning of initial surface-based site characterizations based on the technical know-how accumulated from the underground research laboratory projects. These projects are broad scientific studies of the deep geological environment and provide a technical basis for the geological disposal of high-level radioactive wastes. In this study, a comprehensive task flow from acquisition of existing data to planning of field investigations through the modeling has been specified. Specific task flow and decision-making process to perform the tasks have been specified. (authors)

  6. Potential for low fracture toughness and lamellar tearing on PWR steam generator and reactor coolant pump supports. Resolution of generic technical activity A-12

    International Nuclear Information System (INIS)

    Snaider, R.P.; Hodge, J.M.; Levin, H.A.; Zudans, J.J.

    1979-10-01

    This report summarizes work performed by the Nuclear Regulatory Commission staff and its contractor, Sandia Laboratories, in the resolution of Generic Technical Activity A-12, ''Potential for Low Fracture Toughness and Lamellar Tearing in PWR Steam Generator and Reactor Coolant Pump Supports.'' The report describes the technical issues, the technical studies performed by Sandia describes the technical issues, the technical studies performed by Sandia Laboratories, the NRC staff's technical positions based on these studies, and the staff's plan for implementing its technical positions. It also provides recommendations for further work. The complete technical input from Sandia Laboratories is appended to the report

  7. The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

    Science.gov (United States)

    McGhee, D. S.

    2006-01-01

    Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

  8. Technical data summary supporting the spent nuclear fuel environment impact statement, March 1994

    International Nuclear Information System (INIS)

    Geddes, R.L.; Claxton, R.E.; Lengel, J.D.

    1994-03-01

    This report has been compiled by the WSRC Nuclear Materials Processing Division's Planning Section at the request of the Office of Spent Fuel Management and Special Projects (EM-37) to support issuance of the Spent Nuclear Fuel Environmental Impact Statement. Savannah River Site input data evaluates five programmatic options (including open-quotes No Actionclose quotes) ranging up to transfer of all DOE responsibility spent fuel to the SRS. For each option, a range of management/disposition scenarios has been examined. Each case summary provides information relative to the technical proposal, technical issues, environmental impacts, and projected costs for a forty year period (FY-35) when it is assumed that the material will be dispositioned from the SRS. The original issue of the report which was prepared under severe time constraints contained many simplifications and assumptions. Although the revisions have corrected some of the shortcomings of the original report, it is still highly recommended that significant additional study be performed before basing key decisions upon the data contained in this report. The data represents the best effort by a significant group of technical personnel familiar with nuclear materials processing, handling, and storage; but it is likely that careful scrutiny will reveal numerous discrepancies, inconsistencies and omissions. Nor does this report attempt to analyze every potential disposal pathway, but probably establishes the bounds for the most of the viable pathways. The bulk of the effort went into defining the engineering approaches necessary to execute the various mission scenarios which were changed since the last revision. The decision to limit reprocessing to only SRS aluminum clad required a major alteration of the TDS. Collection and/or calculation of much of the various waste, emission, and utility consumption data, so important to an EIS, has been updated since the last revision, but not thoroughly completed

  9. Major KEEP Findings, 1971 - 1975.

    Science.gov (United States)

    Kamehameha Schools, Honolulu, HI. Kamehameha Early Education Project.

    This report lists the 34 major research findings from the Kamehameha Early Education Program (KEEP) for the years 1971-1975. Each finding is accompanied by a listing of KEEP technical reports and working papers which contain information relevant to that finding. Included among areas covered in the findings are: (1) student motivation, (2) teacher…

  10. TWRS vadose zone contamination issue expert panel status report

    International Nuclear Information System (INIS)

    Shafer, D.S.

    1997-01-01

    When members were first canvassed for participation in the Vadose Zone Expert Panel the stated purpose for convening the Panel was to review a controversial draft report, the SX Tank Farm Report. This report was produced by a DOE Grand Junction Project Office (GJPO) contractor, RUST Geotech, now MACTEC-ERS, for the DOE Richland Office (DOERL). Three meetings were planned for June, July and August, 1995 to review the draft report and to complete a Panel report by mid-September. The Expert Panel has found its efforts confounded by various non-technical issues. The Expert Panel has chosen to address some of the non-technical issues in this Preface rather than to dilute the technical discussion that follows in the body of this independent expert panel status report (Panel Report). Rather than performing a straightforward manuscript review, the Panel was asked to resolve conflicting interpretations of gamma-ray logging measurements performed in vadose zone boreholes (drywells) surrounding the high-level radioactive wastes of the SX tank farm. There are numerous and complex technical issues that must be evaluated before the vertical and radial extent of contaminant migration at the SX tank farm can be accurately assessed. When the Panel first met in early June, 1996, it quickly became apparent that the scientific and technical issues were obscured by policy and institutional affairs which have polarized discussion among various segments of the Hanford organization. This situation reflects the kinds of institutional problems described separately in reports by the National Research Council of the National Academy of Sciences (NAS/NRC), The Hanford Tanks Environmental Impacts and Policy Choices and BmTiers to Science: Technical Management of the Department of Energy Environmental Remediation Program. The Vadose Zone Characterization Program, appears to be caught between conflicting pressures and organizational mandates, some imposed from outside DOE-RL and some self

  11. Operating experience feedback report: Technical specifications: Commercial power reactors

    International Nuclear Information System (INIS)

    O'Reilly, P.D.; Plumlee, G.L. III.

    1989-03-01

    This report documents a trends and patterns analysis of technical specification (TS)-related licensee event reports (LERs) conducted by the Nuclear Regulatory Commission's (NRC's) Office for Analysis and Evaluation of Operational Data (AEOD). The objectives of this analysis were (1) to identify and catalog technical specification-related LERs, (2) to categorize and evaluate the events reported in these a LERs, (3) to identify any issues arising from the evaluation which appear to have generic safety significance, or which relate to the on-going Technical Specification Improvement Program, and (4) to trend the results obtained from the analysis of the data obtained in (1) through (3). 9 refs., 9 figs., 22 tabs

  12. Major intraoperative complications during video-assisted thoracoscopic anatomical lung resections

    DEFF Research Database (Denmark)

    Decaluwe, Herbert; Petersen, René Horsleben; Hansen, Henrik

    2015-01-01

    OBJECTIVES: A multicentre evaluation of the frequency and nature of major intraoperative complications during video-assisted thoracoscopic (VATS) anatomical resections. METHODS: Six European centres submitted their series of consecutive anatomical lung resections with the intention to treat by VATS...... for technical reasons. In-hospital mortality was 1.4% (n = 43). Conversion to open thoracotomy was observed in 5.5% (n = 170), of whom 21.8% (n = 37) were for oncological reasons, 29.4% (n = 50) for technical reasons and 48.8% (n = 83) for complications. Vascular injuries were reported in 2.9% (n = 88) patients...... major surgery (n = 9) or immediate life-threatening complications (n = 17). Twenty-three percent of the in-hospital mortalities (n = 10/43) were related to major intraoperative complications. Eight pneumonectomies (five intraoperative and three postoperative at 0.3%) were a consequence of a major...

  13. Minutes of the IFMIF technical meetings, May 17-20, 2005, Tokyo, Japan

    International Nuclear Information System (INIS)

    Ida, Mizuho; Nakamura, Hiroo; Yutani, Toshiaki; Maebara, Sunao; Umetsu, Tomotake; Sugimoto, Masayoshi

    2005-08-01

    The International Fusion Materials Irradiation Facility (IFMIF) Technical Meetings were held on May 17-20, 2005 at Japan Atomic Energy Research Institute (JAERI) Tokyo. The main objectives were 1) to review technical status of the subsystems; accelerator, target and test facilities, 2) to technically discuss interface issues between target and test facilities, 3) to review results of peer-reviews performed in the EU and Japan, 4) to harmonize design/experimental activities among the subsystems, 5) to review and discuss the Engineering Validation and Engineering Design Activity (EVEDA) tasks, and 6) to make a report of 1) - 5) to the IFMIF Executive Subcommittee. This report presents a brief summary of the Target Technical, Meeting, Test Facilities Technical Meeting, Target/Test Facilities Interface Meeting, Accelerator Technical Meeting and the Technical Integration Meeting. (author)

  14. 78 FR 38311 - Reliability Technical Conference Agenda

    Science.gov (United States)

    2013-06-26

    ... issues related to the reliability of the Bulk-Power System. The agenda for this conference is attached... Reliability Technical Docket No. AD13-6-000 Conference. North American Electric Docket No. RC11-6-004 Reliability Corporation. North American Electric Docket No. RR13-2-000 Reliability Corporation. Not...

  15. Economic Reform Orchestra And Technical Manpower Development ...

    African Journals Online (AJOL)

    The study examined economic reform issues in Nigeria since 1986 and the impact on technical manpower development in Rivers State in particular. Two sets of structured questionnaire were used to elicit responses from target respondents who ultimately comprised 105 instructors and 340 final year students in the four ...

  16. Women and the nuclear issue

    International Nuclear Information System (INIS)

    Locke, David

    1989-01-01

    From the opinion surveys it was concluded that women do have different attitudes towards nuclear power compared to men. Women are more likely to be suspicious of nuclear power, mention the problem areas and less likely to mention benefits. The reasons for this are not difficult to understand, with, for example, the media highlighting the dangers of nuclear power, in particular the hazards of radiation as it affects people, especially children. The majority of women associate nuclear power with weapons and radiation, though specific fears about cancer including leukaemia are not as strong as might be expected. The major issue is still the disposal of waste, though for a time after Chernobyl the major nuclear accident superseded this. Women tend to be more confused by the wide range of issues presented to them and the contradictory attitudes. In our experience about twice as many women as men admit to being a d on't know . Women are more concerned with people and the environment than men. Men are more inclined to be brought up from an early age to be machine minded and they tend as a result to be more sympathetic towards the use of technology in society. It is not necessarily true that women are more 'anti-nuclear' although this does come out in many opinion polls. I think that women react to the leading question as to whether they are 'in favour' or 'not' of nuclear power by responding negatively because of their confusion. We have asked similar questions in our own opinion surveys but have given the opportunity for the respondent to declare a positive attitude towards nuclear power 'with reservations'. If they are allowed to express their reservations they often come to the conclusion in an intuitive way that nuclear power will be needed in the next century to provide energy for their children when the oil and gas run out and the coal is used to substitute for the hydrocarbons. A 'necessary evil' as one person put it. In the main our recommendation is that although

  17. Women and the nuclear issue

    Energy Technology Data Exchange (ETDEWEB)

    Locke, David [UKAEA (United Kingdom)

    1989-07-01

    From the opinion surveys it was concluded that women do have different attitudes towards nuclear power compared to men. Women are more likely to be suspicious of nuclear power, mention the problem areas and less likely to mention benefits. The reasons for this are not difficult to understand, with, for example, the media highlighting the dangers of nuclear power, in particular the hazards of radiation as it affects people, especially children. The majority of women associate nuclear power with weapons and radiation, though specific fears about cancer including leukaemia are not as strong as might be expected. The major issue is still the disposal of waste, though for a time after Chernobyl the major nuclear accident superseded this. Women tend to be more confused by the wide range of issues presented to them and the contradictory attitudes. In our experience about twice as many women as men admit to being a ''don't know''. Women are more concerned with people and the environment than men. Men are more inclined to be brought up from an early age to be machine minded and they tend as a result to be more sympathetic towards the use of technology in society. It is not necessarily true that women are more 'anti-nuclear' although this does come out in many opinion polls. I think that women react to the leading question as to whether they are 'in favour' or 'not' of nuclear power by responding negatively because of their confusion. We have asked similar questions in our own opinion surveys but have given the opportunity for the respondent to declare a positive attitude towards nuclear power 'with reservations'. If they are allowed to express their reservations they often come to the conclusion in an intuitive way that nuclear power will be needed in the next century to provide energy for their children when the oil and gas run out and the coal is used to substitute for the hydrocarbons. A 'necessary evil' as one person put it. In the main our recommendation is that

  18. Insight into the da Vinci® Xi - technical notes for single-docking left-sided colorectal procedures.

    Science.gov (United States)

    Ngu, James Chi-Yong; Sim, Sarah; Yusof, Sulaiman; Ng, Chee-Yung; Wong, Andrew Siang-Yih

    2017-12-01

    The adoption of robot-assisted laparoscopic colorectal surgery has been hampered by issues with docking, operative duration, technical difficulties in multi-quadrant access, and cost. The da Vinci® Xi has been designed to overcome some of these limitations. We describe our experience with the system and offer technical insights to its application in left-sided colorectal procedures. Our initial series of left-sided robotic colorectal procedures was evaluated. Patient demographics and operative outcomes were recorded prospectively using a predefined database. Between March 2015 and April 2016, 54 cases of robot-assisted laparoscopic left-sided colorectal procedures were successfully completed with no cases of conversion. The majority were low anterior resections for colorectal malignancies. Using the da Vinci® Xi Surgical System, multi-quadrant surgery involving dissection from the splenic flexure to the pelvis was possible without redocking. The da Vinci® Xi simplifies the docking procedure and makes single-docking feasible for multi-quadrant left-sided colorectal procedures. Copyright © 2016 John Wiley & Sons, Ltd.

  19. Yucca Mountain Project: A summary of technical support activities, January 1987--June 1988

    International Nuclear Information System (INIS)

    1989-05-01

    This report is a summary of the technical support activities of Mifflin ampersand Associates, Inc., during the 18-month period beginning 01 January 1987 and ending on 30 June 1988. It covers the following topics: Vadose zone drilling site selection, permits and quality assurance (QA) procedures; climate change; geochemistry, mineralogy; disturbed zone; hydrogeology; and review of technical documents. The report is organized by generally discussing each topic from the following perspectives: issue(s), objective(s) of activity, finding(s), interpretation of finding(s), additional work needed, recommended program, and existing program

  20. New challenges for Sportis Scientific Technical Journal

    Directory of Open Access Journals (Sweden)

    Víctor Arufe Giráldez

    2015-09-01

    Full Text Available In the publishing of this issue we want to advance two major events, the first of which is to inform the Sportis Magazine will from September 1, part of official scientific journal of the University of A Coruña, with this integration It aims to improve the dissemination of the journal in the most prestigious data bases of international level and contribute to the visibility of the University of A Coruña as committed to research in school sports college, psychomotor and Physical Education.The second story that we want to give is that the November 5-7 will be held at the Faculty of Education at the University of A Coruna, the V World Congress of Sports, Physical Education and Psychomotor School. You can participate by presenting a communication, poster or virtual poster, the best papers will be invited to publish their work as research article in the following issues of the magazine. Disponéis more information on the web www.sportis.es.In this third and final issue of the year, we beat record of article, in part due to the increase in the number of items received, a total of 10 works by experts and professionals from different countries will be published. Some of the issues addressed are: first aid teacher training, the attitude toward students with disabilities, futsal, using accelerometers, bodyboard training in young, innovative proposals such as the teaching unit based Hypopressive method, aquatic motor skills, study of sports organizations, studies involving different experts from different countries, analysis of skills in physical education ... Undoubtedly an interesting number to enjoy a good coffee or tea and gain greater technical and scientific knowledge.All equipment Sportis want is your pleasure this new publication and invite you to submit your work for future issues.Receive a warm greeting,Prof. Dr. Victor Arufe GiráldezChief Editor Sportis. International Journal of School Sports, Physical Education and Psychomotor

  1. 41th Plenary Meeting Report of the Scientific, Technical and Economic Committee for Fisheries (PLEN-12-03)

    DEFF Research Database (Denmark)

    Abella, J. A.; Andersen, J.; Bailey, N.

    The Scientific, Technical and Economic Committee for Fisheries hold its 41st plenary on 5-9 November 2012 in Brussels (Belgium). The terms of reference included both issues assessments of STECF Expert Working Group reports and additional requests submitted to the STECF by the Commission. Topics d...... dealt were inter alia assessments of Mediterranean and Black Sea stocks, evaluations of fishing effort regimes, technical measures, review of scientific advice on stocks and fisheries of EU interest, fisheries management plans evaluation issues.......The Scientific, Technical and Economic Committee for Fisheries hold its 41st plenary on 5-9 November 2012 in Brussels (Belgium). The terms of reference included both issues assessments of STECF Expert Working Group reports and additional requests submitted to the STECF by the Commission. Topics...

  2. Non-technical constraints to eradication: the Italian experience.

    Science.gov (United States)

    Moda, Giuliana

    2006-02-25

    Although technical constraints to eradication of bovine tuberculosis are well-recognised, non-technical constraints can also delay progress towards eradication, leading to inefficiency and increased programme costs. This paper seeks to analyse the main non-technical constraints that can interfere with the successful implementation of tuberculosis eradication plans, based on experiences from an area of high tuberculosis prevalence in Regione Piemonte, Italy. The main social and economic constraints faced in the past 20 years are reviewed, including a social reluctance to recognise the importance of seeking eradication as the goal of disease control, effective communication of technical issues, the training and the organization of veterinary services, the relationship between the regional authority and farmers and their representatives, and data management and epidemiological reporting. The paper analyses and discusses the solutions that were applied in Regione Piemonte and the benefits that were obtained. Tuberculosis eradication plans are one of the most difficult tasks of the Veterinary Animal Health Services, and non-technical constraints must be considered when progress towards eradication is less than expected. Organizational and managerial resources can help to overcome social or economic obstacles, provided the veterinary profession is willing to address technical, but also non-technical, constraints to eradication.

  3. Major gas projects in Latin America. Issues and perspectives

    International Nuclear Information System (INIS)

    Khelil, C.

    1997-01-01

    The Latin American energy demand will reach 677 MTOE by 2010, a 50% increase over 1995. There will be a major shift towards use of natural gas in power generation. US 503 10 9 Dollars will be required over 1995-2010 to discover and develop hydrocarbon reserves, build the pipeline system as well as generate and distribute electricity. US 19 10 9 Dollars will be required for gas pipelines and LNG projects in the region. Improvements in the policy, legal and regulatory framework are required in many countries to attract the needed investments. Several major gas projects are being implemented or planned in the region: Colombia Enron-built pipeline, Peru Camisea project, Chile Nova gas pipeline from Argentina, the Bolivia-Brazil pipeline and others. The World Bank group has been assisting countries in developing a competitive business environment and can provide, when needed, comfort to lenders in project financing through a guarantee scheme in several large complex cross border projects. (au)

  4. SU-E-CAMPUS-J-04: Image Guided Radiation Therapy (IGRT): Review of Technical Standards and Credentialing in Radiotherapy Clinical Trials

    International Nuclear Information System (INIS)

    Giaddui, T; Chen, W; Yu, J; Gong, Y; Galvin, J; Xiao, Y; Cui, Y; Yin, F; Craig, T; Dawson, L; Al-Hallaq, H; Chmura, S

    2014-01-01

    Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRT to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT

  5. SU-E-CAMPUS-J-04: Image Guided Radiation Therapy (IGRT): Review of Technical Standards and Credentialing in Radiotherapy Clinical Trials

    Energy Technology Data Exchange (ETDEWEB)

    Giaddui, T; Chen, W; Yu, J; Gong, Y; Galvin, J; Xiao, Y [Thomas Jefferson University, Philadelphia, PA (United States); Cui, Y; Yin, F [Duke University Medical Center, Durham, NC (United States); Craig, T; Dawson, L [The Princess Margaret Cancer Centre - UHN, Toronto, ON (Canada); Al-Hallaq, H; Chmura, S [The University of Chicago, Chicago, IL. (United States)

    2014-06-15

    Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRT to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT

  6. Issues related to the inter-utility transfer of material

    International Nuclear Information System (INIS)

    1993-08-01

    An option that utilities have for obtaining material is to procure the desired item(s) from another utility. There are several reasons utilities choose another utility as the procurement source including item obsolescence, prohibitive cost on the commercial market, and excessive lead time. This document provides information on the technical, quality, and commercial issues which utilities may need to address when selling material to or procuring material from other utilities. This report provides suggested approaches for each of the following technical and quality issues: Design considerations; item acceptability considerations; original supplier considerations; commercial grade item dedication considerations; reportability considerations; packaging, shipping, and storage considerations; documentation considerations; receipt inspection considerations. The information is provided primarily for the inter-utility transfer of safety-related material. Several of the topics, however, may also apply to the transfer of non-safety-related material. The report also provides considerations on commercial issues which may be addressed during the inter-utility transfer of materials

  7. Scope and Challenges of Technical Education: A Kerala Perspective

    Science.gov (United States)

    Rahman, M. Abdul; Unnikrishnan, Ramesh

    2015-01-01

    Technical education contributes a major share to the overall education system and plays a vital role in the social and economic development of our nation. Since independence, the technical education system in our country has grown into a fairly large-sized system, offering opportunities for education and training in a wide variety of trades and…

  8. Proceedings of the Efficient Separations and Processing Cross-Cutting Program Annual Technical Exchange Meeting

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains summaries of technology development presented at the 1995 Efficient Separations and Processing Cross-Cutting Program (ESP) Annual Technical Exchange Meeting. The ESP is sponsored by the US Department of Energy's Office of Environmental Management (EM), Office of Technology Development. The meeting is held annually to promote a free exchange of ideas among technology developers, potential users (for example, EM focus areas), and other interested parties within EM. During this meeting, developers of ESP-funded technologies describe the problems and needs addressed by their technologies; the technical approach, accomplishments, and resolution of issues; the strategy and schedule for commercialization; and evolving potential applications. Presenters are asked to address the following areas: Target waste management problem, waste stream, or data need; scientific background and technical approach; technical accomplishments and resolution of technical issues; schedule and strategy for commercializing and implementing the technology or acquiring needed data; potential alternate applications of the technology or data, including outside of DOE/EM. The meeting is not a program review of the individual tasks or subtasks; but instead focuses on the technical aspects and implementation of ESP-sponsored technology or data. The meeting is also attended by members of the ESP Technical Review Team, who have the opportunity at that time to review the ESP as a whole

  9. Are chartists artists? The determinants and profitability of recommendations based on technical analysis

    NARCIS (Netherlands)

    Gerritsen, Dirk F.

    2016-01-01

    The value of technical analysis (TA) has been debated for decades; however, limited evidence exists on the profitability of investment recommendations issued by technical analysts. These ‘chartists’ sometimes claim that TA is an art rather than a science. We evaluated > 5000 TA-based buy and sell

  10. IMPAK - 3/2003 issue

    International Nuclear Information System (INIS)

    2003-01-01

    IMPAK is quarterly bulletin of the Department of Environment, Malaysia. In this issue, IMPAK's theme is A Clean Environment for Healthy Living. This theme is also being used by Malaysian Environment Week (MASM), which was celebrated on 21-27 October 2003. IMPAK and MASM chose this theme to instill greater awareness and care for the environment so that all Malaysian will work together to protect their common heritage. Four feature articles are selected to strengthen the theme. The first article is Proper Solid Waste Management for Healthy Living: Importance and Key to Success explain that proper planning and management of solid waste is crucial and the best technical solution for it is public involvement. The second article is Recycling Our Commitment Towards Environmental Conservation' describe the tremendous benefits of recycling from economic and environmental aspects and its impact to save Mother Earth. The third article is From River to Drain (and Back Again) tells the uniqueness of relationship between rivers and local residents leads to the successful of nature waterways restoration. Last article Environmental Reporting: Issues and Challenges Ahead, explains the needs of having environmental report as it becomes reference for future development. In Technical Update section, IMPAK provide info on Biofilters for Hydrogen Sulfide Odour Control

  11. Safety of RBMK reactors: Setting the technical framework

    International Nuclear Information System (INIS)

    Lederman, L.

    1996-01-01

    This article reviews major efforts for improving the safety of RBMK reactors through a co-operative IAEA programme initiated in 1992. Specifically covered are technical findings of safety reviews related to the design and operation of the plants, and the documentation of findings through an Agency database intended to facilitate the technical co-ordination of ongoing national and international efforts for improving RBMK safety

  12. Technical evaluation of bids for nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    In continuation of its efforts to provide comprehensive and impartial guidance to Member States facing the need to introduce nuclear power, the International Atomic Energy Agency is issuing this guidebook as part of a series of guidebooks and codes of practice and, in particular, as a necessary supplement to 'Economic Evaluation of Bids for Nuclear Power Plants: A Guidebook', published by the IAEA in 1976 as Technical Reports Series No.175. The present publication is intended for project managers and senior engineers of electric utilities who are concerned with the evaluation of bids for a nuclear power project. It assumes that the reader has a good knowledge of the technical characteristics of nuclear power plants and of nuclear power project implementation. Its purpose is to provide the information necessary to organize, guide and supervise the technical evaluation of bids for a nuclear power project. It goes without saying that the technical staff carrying out the evaluation must have prior technical experience which cannot be provided by a guidebook

  13. Strategy for resolution of the flammable gas safety issue

    International Nuclear Information System (INIS)

    Johnson, G.D.

    1997-01-01

    This document provides a strategy for resolution of the Flammable Gas Safety Issue. It defines the key elements required for the following: Closing the Flammable Gas Unreviewed Safety Question (USQ); Providing the administrative basis for resolving the safety issue; Defining the data needed to support these activities; and Providing the technical and administrative path for removing tanks from the Watch List

  14. Strategy for resolution of the flammable gas safety issue

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D.

    1997-05-23

    This document provides a strategy for resolution of the Flammable Gas Safety Issue. It defines the key elements required for the following: Closing the Flammable Gas Unreviewed Safety Question (USQ); Providing the administrative basis for resolving the safety issue; Defining the data needed to support these activities; and Providing the technical and administrative path for removing tanks from the Watch List.

  15. Technical and governance considerations for advanced metering infrastructure/smart meters: Technology, security, uncertainty, costs, benefits, and risks

    International Nuclear Information System (INIS)

    McHenry, Mark P.

    2013-01-01

    The fundamental role of policymakers when considering Advanced Metering Infrastructure (AMI), or ‘smart meters for energy and water infrastructure is to investigate a broad range of complex interrelated issues. These include alternative technical and non-technical options and deployment needs, the cost and benefits of the infrastructure (risks and mitigation measures), and the impact of a number of stakeholders: consumers, distributors, retailers, competitive market operators, competing technology companies, etc. The scale and number of potential variables in the AMI space is an almost unprecedented challenge to policymakers, with the anticipation of new ancillary products and services, associated market contestability, related regulatory and policy amendments, and the adequacy of consumer protection, education, and safety considerations requiring utmost due-diligence. Embarking on AMI investment entails significant technical, implementation, and strategic risk for governments and administering bodies, and an active effort is required to ensure AMI governance and planning maximises the potential benefits, and minimise uncertainties, costs, and risks to stakeholders. This work seeks to clarify AMI fundamentals and discusses the technical and related governance considerations from a dispassionate perspective, yet acknowledges many stakeholders tend to dichotomise debate, and obfuscate both advantages and benefits, and the converse. - Highlights: • AMI presents an almost unprecedented technical and governance policy challenge. • AMI enables vertical integration of electricity, gas, water, IT, and telco entities • AMI investments involve major technical, implementation, and strategic decisions. • Adequacy of consumer education, safety, privacy, and protection is paramount. • Policy must maximise AMI benefits and minimise uncertainties, costs, and risks

  16. CERN LHC Technical Infrastructure Monitoring (TIM)

    CERN Document Server

    Epting, U; Martini, R; Sollander, P; Bartolomé, R; Vercoutter, B; Morodo-Testa, M C

    1999-01-01

    The CERN Large Hadron Collider (LHC) will start to deliver particles to its experiments in the year 2005. However, all the primary services such as electricity, cooling, ventilation, safety systems and others such as vacuum and cryogenics will be commissioned gradually between 2001 and 2005. This technical infrastructure will be controlled using industrial control systems, which have either already been purchased from specialized companies or are currently being put together for tender. This paper discusses the overall architecture and interfaces that will be used by the CERN Technical Control Room (TCR) to monitor the technical services at CERN and those of the LHC and its experiments. The issue of coherently integrating existing and future control systems over a period of five years with constantly evolving technology is addressed. The paper also summarizes the functionality of all the tools needed by the control room such as alarm reporting, data logging systems, man machine interfaces and the console mana...

  17. Bioethics for Technical Experts

    Science.gov (United States)

    Asano, Shigetaka

    Along with rapidly expanding applications of life science and technology, technical experts have been implicated more and more often with ethical, social, and legal problems than before. It should be noted that in this background there are scientific and social uncertainty elements which are inevitable during the progress of life science in addition to the historically-established social unreliability to scientists and engineers. In order to solve these problems, therefore, we should establish the social governance with ‘relief’ and ‘reliance’ which enables for both citizens and engineers to share the awareness of the issues, to design social orders and criterions based on hypothetical sense of values for bioethics, to carry out practical use management of each subject carefully, and to improve the sense of values from hypothetical to universal. Concerning these measures, the technical experts can learn many things from the present performance in the medical field.

  18. Establishing a legal service for major trauma patients at a major trauma centre in the UK.

    Science.gov (United States)

    Seligman, William H; Thompson, Julian; Thould, Hannah E; Tan, Charlotte; Dinsmore, Andrew; Lockey, David J

    2017-09-01

    Major trauma causes unanticipated critical illness and patients have often made few arrangements for what are sudden and life-changing circumstances. This can lead to financial, housing, insurance, legal and employment issues for patients and their families.A UK law firm worked with the major trauma services to develop a free and comprehensive legal service for major trauma patients and their families at a major trauma centre (MTC) in the UK. In 2013, a legal service was established at North Bristol NHS Trust. Referrals are made by trauma nurse practitioners and it operates within a strict ethical framework. A retrospective analysis of the activity of this legal service between September 2013 and October 2015 was undertaken. 66 major trauma patients were seen by the legal teams at the MTC. 535 hours of free legal advice were provided on non-compensation issues-an average of 8 hours per patient. This initiative confirms a demand for the early availability of legal advice for major trauma patients to address a range of non-compensation issues as well as for identification of potential compensation claims. The availability of advice at the MTC is convenient for relatives who may be spending the majority of their time with injured relatives in hospital. More data are needed to establish the rehabilitation and health effects of receiving non-compensation advice after major injury; however, the utilisation of this service suggests that it should be considered at the UK MTCs. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  19. A compendium of major US radiation protection standards and guides

    International Nuclear Information System (INIS)

    Mills, W.A.; Flack, D.S.; Arsenault, F.J.; Conti, E.F.

    1988-07-01

    Following discussion of the general issue, the CIRRPC Executive Committee approved, with concurrence of the full Committee, an Oak Ridge Associated Universities (ORAU) staff proposal to develop a compendium of Fact Sheets on the major US radiation protection standards and guides, existing or proposed. The compendium contains relevant legal or statutory information and detailed technical requirements that state and describe the protection to be achieved. The report provides appropriate legislative citations; notes any legislative language that gave direction to the development of standards promulgated under the legislation; cites rationales for the standards promulgated; and provides a listing of related standards. Two consultants with considerable experience in radiation protection regulations were contracted to assist the ORAU staff in developing the report. This report has been reviewed twice by the CIRRPC member agencies; once to ensure the accuracy of all the legal and technical facts in the compendium, and once to comment on the entire document, including the accompanying text. This final report reflects consideration of all the agencies' comments received during the reviews. Part I of this report presents information on the selection, preparation and content of the Fact Sheets; an overview of their scopes, applications and modes of control; and the ORAU conclusions and recommendations. Part II contains the Fact Sheets and a User's Guide to finding relevant information in the Fact Sheets

  20. Of Perspectives, Issues, and Politics in Materials Technology

    Science.gov (United States)

    Promisel, Nathan E.

    1985-12-01

    Recognizing the pervasive importance of materials science and engineering (MSE) to practically every facet of man’s life, this lecture takes a broad view of the origin and technical trends and achievements in MSE, briefly reviewing its history and relationship to society over many millennia, to the present day, with specific examples. Major emphasis, however, is placed on modern MSE as related to current national issues, using as illustrations of the latter natural resources, industry and the economy, research and development, education, and technology transfer. The discussion of these areas leads to consideration of the role of the Federal Government and the importance of and need for a coherent national policy to deal with critical issues, many of which are listed herein. Some important steps by the Government fostering high level coordination as well as cooperation among government, industry, and academe are cited. Having thus illustrated the pervasive and vital impact of MSE on society, and its current esteemed recognition and position of influence, the lecture concludes that in this period of global change — social, economic, and technological — there is a challenge to MSE to respond beneficially to societal needs more than ever before. The opportunity and mechanisms now exist. Greater participation in the public and political arenas, with mutual education, is indicated.

  1. Power System Technical Performance Issues Related to the Application of Long HVAC Cables

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    The aim of this TB is to serve as a practical guide for preparing models and performing studies necessary during the assessment of the technical performance of HV/EHV systems with a large share of (long) AC cables. The brochure follows all phases of planning and analysis of a typical underground...

  2. Technical approach document

    International Nuclear Information System (INIS)

    1989-12-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law 95-604 (PL95-604), grants the Secretary of Energy the authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards caused by inactive uranium mill sites. This Technical Approach Document (TAD) describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement remedial action plans (RAPS) and final designs that comply with EPA standards. It does not address the technical approaches necessary for aquifer restoration at processing sites; a guidance document, currently in preparation, will describe aquifer restoration concerns and technical protocols. This document is a second revision to the original document issued in May 1986; the revision has been made in response to changes to the groundwater standards of 40 CFR 192, Subparts A--C, proposed by EPA as draft standards. New sections were added to define the design approaches and designs necessary to comply with the groundwater standards. These new sections are in addition to changes made throughout the document to reflect current procedures, especially in cover design, water resources protection, and alternate site selection; only minor revisions were made to some of the sections. Sections 3.0 is a new section defining the approach taken in the design of disposal cells; Section 4.0 has been revised to include design of vegetated covers; Section 8.0 discusses design approaches necessary for compliance with the groundwater standards; and Section 9.0 is a new section dealing with nonradiological hazardous constituents. 203 refs., 18 figs., 26 tabs

  3. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  4. Environmental assessment for operations, upgrades, and modifications in SNL/NM Technical Area IV

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The proposed action for this EA for Sandia National Laboratories/New Mexico Technical Area IV, includes continuing existing operations, modification of an existing accelerator (Particle Beam Fusion Accelerator II) to support defnese-related Z-pinch experiments, and construction of two transformer oil storage tanks to support the expansion of the Advanced Pulsed Power Research Module, a single pulse accelerator. Based on the analyses in the EA, DOE believes that the proposed action is not a major federal action significantly affecting the quality of the human environment within the meaning of NEPA and CEQ NEPA implementing regulations in 40 CFR 1508.18 and 1508.27. Therefore, an environmental impact statement is not required, and a Finding of No Significant Impact is issued.

  5. Environmental assessment for operations, upgrades, and modifications in SNL/NM Technical Area IV

    International Nuclear Information System (INIS)

    1996-04-01

    The proposed action for this EA for Sandia National Laboratories/New Mexico Technical Area IV, includes continuing existing operations, modification of an existing accelerator (Particle Beam Fusion Accelerator II) to support defnese-related Z-pinch experiments, and construction of two transformer oil storage tanks to support the expansion of the Advanced Pulsed Power Research Module, a single pulse accelerator. Based on the analyses in the EA, DOE believes that the proposed action is not a major federal action significantly affecting the quality of the human environment within the meaning of NEPA and CEQ NEPA implementing regulations in 40 CFR 1508.18 and 1508.27. Therefore, an environmental impact statement is not required, and a Finding of No Significant Impact is issued

  6. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  7. GT-MHR power conversion system: Design status and technical issues

    International Nuclear Information System (INIS)

    Etzel, K.; Baccaglini, G.; Schwartz, A.; Hillman, S.; Mathis, D.

    1994-12-01

    The Modular Helium Reactor (MHR) builds on 30 years of international gas-cooled reactor experience utilizing the unique properties of helium gas coolant, graphite moderator and coated particle fuel. To efficiently utilize the high temperature potential of the MHR, an innovative power conversion system has been developed featuring an intercooled and recuperated gas turbine. The gas turbine replaces a conventional steam turbine and its many auxiliary components. The Power Conversion System converts the thermal energy of the helium directly into electrical energy utilizing a closed Brayton cycle. The Power Conversion System draws on even more years of experience than the MHR: the world's first closed-cycle plant, fossil fired and utilizing air as working fluid, started operation in Switzerland in 1939. Shortly thereafter, in 1945, the coupling of a closed-cycle plant to a nuclear heat generation system was conceived. Directly coupling the closed-cycle gas turbine concept to a modern, passively safe nuclear reactor opens a new chapter in power generation technology and brings with it various design challenges. Some of these challenges are associated with the direct coupling of the Power Conversion System to a nuclear reactor. Since the primary coolant is also the working fluid, the Power Conversion System has to be designed for reactor radionuclide plateout. As a result, issues like component maintainability and replaceability, and fission product effects on materials must be addressed. Other issues concern the integration of the Power Conversion System components into a single vessel. These issues include the selection of key technologies for the power conversion components such as submerged generator, magnetic bearings, seals, compact heat exchangers, and the overall system layout

  8. Identity Management issues in Cloud Computing

    OpenAIRE

    Saini, Smita; Mann, Deep

    2014-01-01

    Cloud computing is providing a low cost on demand services to the users, omnipresent network,large storage capacity due to these features of cloud computing web applications are moving towards the cloud and due to this migration of the web application,cloud computing platform is raised many issues like privacy, security etc. Privacy issue are major concern for the cloud computing. Privacy is to preserve the sensitive information of the cloud consumer and the major issues to the privacy are un...

  9. Telemedicine for Developing Countries. A Survey and Some Design Issues.

    Science.gov (United States)

    Combi, Carlo; Pozzani, Gabriele; Pozzi, Giuseppe

    2016-11-02

    Developing countries need telemedicine applications that help in many situations, when physicians are a small number with respect to the population, when specialized physicians are not available, when patients and physicians in rural villages need assistance in the delivery of health care. Moreover, the requirements of telemedicine applications for developing countries are somewhat more demanding than for developed countries. Indeed, further social, organizational, and technical aspects need to be considered for successful telemedicine applications in developing countries. We consider all the major projects in telemedicine, devoted to developing countries, as described by the proper scientific literature. On the basis of such literature, we want to define a specific taxonomy that allows a proper classification and a fast overview of telemedicine projects in developing countries. Moreover, by considering both the literature and some recent direct experiences, we want to complete such overview by discussing some design issues to be taken into consideration when developing telemedicine software systems. We considered and reviewed the major conferences and journals in depth, and looked for reports on the telemedicine projects. We provide the reader with a survey of the main projects and systems, from which we derived a taxonomy of features of telemedicine systems for developing countries. We also propose and discuss some classification criteria for design issues, based on the lessons learned in this research area. We highlight some challenges and recommendations to be considered when designing a telemedicine system for developing countries.

  10. Waste management issues and their potential impact on technical specifications of CANDU fuel materials

    International Nuclear Information System (INIS)

    Tait, J.C.; Johnson, L.H.

    1997-01-01

    The technical specifications for the composition of nuclear fuels and materials used in Canada's CANDU reactors have been developed by AECL and materials manufacturers, taking into account considerations specific to their manufacture and the effect of minor impurities on fuel behaviour in reactor. Nitrogen and chlorine are examples of UO 2 impurities, however, where there is no technical specification limit. These impurities are present in the source materials or introduced in the fabrication process and are neutron activated to 14 C and 36 C1, which after 129 I , are the two most significant contributors to dose in safety assessments for the disposal of used fuel. For certain impurities, environmental factors, particularly the safety of the disposal of used fuels, should be taken into consideration when deriving 'allowable' impurity limits for nuclear fuel materials. (author)

  11. Integrating technical analysis and public values in risk-based decision making

    International Nuclear Information System (INIS)

    Bohnenblust, Hans; Slovic, Paul

    1998-01-01

    Simple technical analysis cannot capture the complex scope of preferences or values of society and individuals. However, decision making needs to be sustained by formal analysis. The paper describes a policy framework which incorporates both technical analysis and aspects of public values. The framework can be used as a decision supporting tool and helps decision makers to make more informed and more transparent decisions about safety issues

  12. Assessment of distributed solar power systems: Issues and impacts

    Science.gov (United States)

    Moyle, R. A.; Chernoff, H.; Schweizer, T. C.; Patton, J. B.

    1982-11-01

    The installation of distributed solar-power systems presents electric utilities with a host of questions. Some of the technical and economic impacts of these systems are discussed. Among the technical interconnect issues are isolated operation, power quality, line safety, and metering options. Economic issues include user purchase criteria, structures and installation costs, marketing and product distribution costs, and interconnect costs. An interactive computer program that allows easy calculation of allowable system prices and allowable generation-equipment prices was developed as part of this project. It is concluded that the technical problems raised by distributed solar systems are surmountable, but their resolution may be costly. The stringent purchase criteria likely to be imposed by many potential system users and the economies of large-scale systems make small systems (less than 10 to 20 kW) less attractive than larger systems. Utilities that consider life-cycle costs in making investment decisions and third-party investors who have tax and financial advantages are likely to place the highest value on solar-power systems.

  13. 75 FR 35021 - Reliability Standards Development and NERC and Regional Entity Enforcement; Notice of Technical...

    Science.gov (United States)

    2010-06-21

    ... Standards Development and NERC and Regional Entity Enforcement; Notice of Technical Conference June 15, 2010... Technical Conference to address industry perspectives on certain issues pertaining to the development and... Electric Reliability Organization's (ERO) standards development process; communication and interactions...

  14. Reader-Centered Technical Writing

    Science.gov (United States)

    Narayanan, M.

    2012-12-01

    an old schema. This reinforces basic engineering and mathematical design concepts. Accommodation: Here, it may work in a different manner. Writers may have to accommodate an old schema to a new object. This helps engineers to focus more on applications. Adaptation: Assimilation and accommodation are the two sides of adaptation, Jean Piaget's term for what most of us would call learning. Mathematical design concepts generated by students should be suitable for creative engineering applications. References : Phillips, D. C. and Soltis, Jonas F. (2003) "Piagetian Structures and Psychological Constructivism," in Perspectives on Learning (4th edition). New York: Teachers College Press. Salvo, Michael J. (2001). Ethics of Engagement: User-Centered Design and Rhetorical Methodology. Technical Communication Quarterly Volume 10, Issue 3, 2001. pages 273-290. http://www.ship.edu/~cgboeree/piaget.html http://owl.english.purdue.edu/owl/resource/624/01/

  15. Overview of Variable Renewable Energy Regulatory Issues: A Clean Energy Regulators Initiative Report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.; Cox, S.

    2014-05-01

    This CERI report aims to provide an introductory overview of key regulatory issues associated with the deployment of renewable energy -- particularly variable renewable energy (VRE) sources such wind and solar power. The report draws upon the research and experiences from various international contexts, and identifies key ideas that have emerged from the growing body of VRE deployment experience and regulatory knowledge. The report assumes basic familiarity with regulatory concepts, and although it is not written for a technical audience, directs the reader to further reading when available. VRE deployment generates various regulatory issues: substantive, procedural, and public interest issues, and the report aims to provide an empirical and technical grounding for all three types of questions as appropriate.

  16. Key issues on safety design basis selection and safety assessment

    International Nuclear Information System (INIS)

    An, S.; Togo, Y.

    1976-01-01

    In current fast reactor design in Japan, four design accident conditions and four design seismic conditions are adopted as the design base classifications. These are classified by the considerations on both likelihood of occurrence and the severeness of the consequences. There are several major problem areas in safety design consideration such as core accident problems which include fuel sodium interaction, fuel failure propagation and residual decay heat removal, and decay heat removal systems problems which is more or less the problem of selection of appropriate system and of assurance of high reliability of the system. In view of licensing, two kinds of accidents are postulated in evaluating the adequacy of a reactor site. The one is the ''major accident'' which is the accident to give most severe radiation hazard to the public from technical point of view. The other is the ''hypothetical accident'', induced public accident of which is severer than that of major accident. While the concept of the former is rather unique to Japanese licensing, the latter is almost equivalent to design base hypothetical accident of the US practice. In this paper, design bases selections, key safety issues and some of the licensing considerations in Japan are described

  17. Current uranium mill licensing issues

    International Nuclear Information System (INIS)

    Scarano, R.A.

    1977-01-01

    The problems encountered to insure environmentally safe mining and milling of uranium ores are reviewed. Emphasis is placed on the management of tailings resulting from milling operations. It is pointed out that although the concentration of radioactivity in the tailings is relatively low, control measures are necessary because of the large quantities involved and because of the long half-life of the parent radionuclides present. The major concerns with mill tailings are radon release to the atmosphere and isolation of the tailings from the human environment. Since it is anticipated that the amount of tailings created by the year 2000 will be more than an order of magnitude greater than the quantities that have been generated during the past 30 years, it is recommended that all mill tailings storage areas be located remote from public contact and in areas such that disruption and dispersion by natural forces and seepage of toxic materials into ground water systems are reduced to the maximum extent achievable. Technical issues that receive attention during the NRC licensing process for uranium mills and the preparation of environmental impact statements are discussed briefly

  18. 7. IAEA Technical Meeting on Steady State Operation of Magnetic Fusion Devices - Booklet of abstracts

    International Nuclear Information System (INIS)

    2015-01-01

    This meeting has provided an appropriate forum to discuss current issues covering a wide range of technical topics related to the steady state operation issues and also to encourage forecast of the ITER performances. The technical meeting includes invited and contributed papers. The topics that have been dealt with are: 1) Superconducting devices (ITER, KSTAR, Tore-Supra, HT-7U, EAST, LHD, Wendelstein-7-X,...); 2) Long-pulse operation and advanced tokamak physics; 3) steady state fusion technologies; 4) Long pulse heating and current drive; 5) Particle control and power exhaust, and 6) ITER-related research and development issues. This document gathers the abstracts

  19. Technical considerations associated with spent fuel acceptance. Final report

    International Nuclear Information System (INIS)

    Supko, E.M.

    1996-06-01

    This study was initiated by the Electric Power Research Institute (EPRI) to identify technical considerations associated with spent fuel acceptance and implementation of a waste management system that includes the use of transportable storage systems, and to serve as an opening dialogue among Standard Contract Holders and the department of Energy's Office of Civilian Radioactive Waste management (OCRWM) prior to the development of waste acceptance criteria or issuance of a Notice of Proposed Rulemaking by OCRWM to amend the Standard Contract. The original purpose of the Notice of Proposed Rulemaking was to address changes to the Standard Contract to implement a multi-purpose canister based system and to address other issues that were not adequately addressed in the standard contract. Even if DOE does not develop a multi-purpose canister based system for waste acceptance, it will still be necessary to develop waste acceptance criteria in order to accept spent fuel in transportable storage systems that are being deployed for at-reactor storage. In this study, technical issues associated with spent fuel acceptance will be defined and potential options and alternatives for resolution of technical considerations will be explored

  20. The Changing Role of Vocational and Technical Education and Training (VOTEC). Women in Vocational and Technical Education: Changes and Challenges.

    Science.gov (United States)

    Organisation for Economic Cooperation and Development, Paris (France).

    Changes in the vocational and technical education (VTE) opportunities available for women in Organisation for Economic Cooperation Development (OECD) member countries in response to changing labor markets and job skill requirements were discussed at a June 1994 meeting of experts. The discussions focused on the following issues: gender differences…

  1. Evolving the Nation's Energy Infrastructure: A Challenging System Issue for the Twenty-First Century; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Garrett, B.

    2007-04-01

    Over the next several decades, a profound transformation of the global energy enterprise will occur driven largely by population growth and economic development. How this growing demand for energy is met poses one of the most complex and challenging issues of our time. The current national energy dialogue reflects the challenge in simultaneously considering the social, political, economic, and technical issues as the energy system is defined, technical targets are established, and programs and investments are implemented to meet those technical targets. This paper examines the general concepts and options for meeting this challenge.

  2. SUSTAINING OCCUPATIONAL INFORMATION FOR CAREER CHOICE AND DEVELOPMENT IN STUDENTS OF TECHNICAL COLLEGES IN ENUGU STATE, NIGERIA

    OpenAIRE

    Moses Ikebe Odo

    2015-01-01

    This study takes on the issue of sustaining occupational information for career choice and development in students of technical colleges in Enugu State, Nigeria. The method adopted for this study was the survey design and the population included were all final year students of the three government technical colleges in Enugu State of Nigeria. The technical colleges were sampled as follows: Government Technical College, Enugu (156 students); Government Technical College, Nsukka (148 students);...

  3. 77 FR 41402 - Supplemental Notice of Technical Conference

    Science.gov (United States)

    2012-07-13

    ... staff-led conference will be held in the Commission Meeting Room at the Commission's headquarters at 888.... A free webcast of the technical conference will be available. Anyone with Internet access who...) 208-2106 with the requested accommodations. Anyone wishing to comment on issues raised at the...

  4. Technical guide to criticality alarm system design

    International Nuclear Information System (INIS)

    Greenfield, B.

    2009-01-01

    An instructional manual was created to guide criticality safety engineers through the technical aspects of designing a criticality alarm system (CAS) for Dept. of Energy (DOE) hazard class 1 and 2 facilities. The manual was structured such that it can be used by engineers designing completely new systems and by those who are working with existing facilities. Major design tasks are thoroughly analyzed to provide concise direction for how to complete the analysis. Regulatory and technical performance requirements were both addressed. (authors)

  5. Introduction to insurance mathematics technical and financial features of risk transfers

    CERN Document Server

    Olivieri, Annamaria

    2015-01-01

    This second edition expands the first chapters, which focus on the approach to risk management issues discussed in the first edition, to offer readers a better understanding of the risk management process and the relevant quantitative phases. In the following chapters the book examines life insurance, non-life insurance and pension plans, presenting the technical and financial aspects of risk transfers and insurance without the use of complex mathematical tools.   The book is written in a comprehensible style making it easily accessible to advanced undergraduate and graduate students in Economics, Business and Finance, as well as undergraduate students in Mathematics who intend starting on an actuarial qualification path. With the systematic inclusion of practical topics, professionals will find this text useful when working in insurance and pension related areas, where investments, risk analysis and financial reporting play a major role.

  6. Internet of Things in Marketing: Opportunities and Security Issues

    Science.gov (United States)

    Abashidze, Irakli; Dąbrowski, Marcin

    2016-12-01

    Internet of Things (IoT) affects different areas of human activities: everyday life of ordinary citizens, work style of marketing teams, factories and even entire cities. Large companies try to implement the technology in their marketing strategy that reshapes not only communication style and product promotion but consumers' expectations, perceptions and requirements towards companies. IoT is expected to become a huge network that will encompass not only smart devices but significantly influence humans' behavior, in this particular case - decision making style in different phases of purchase process. Therefore, the need for comprehensive scientific research is necessary. The issue needs to be reviewed from various points of view, such as opportunities, advantages, disadvantages, legal and technical considerations. The paper is an attempt to review different aspects of using Internet of Things for marketing purposes, identify some of the major problems and present possible ways of solution.

  7. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How does my group identify a qualified technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS...: (1) Demonstrated knowledge of hazardous or toxic waste issues, relocation issues, redevelopment...

  8. Waste management issues and their potential impact on technical specifications of CANDU fuel materials

    Energy Technology Data Exchange (ETDEWEB)

    Tait, J.C.; Johnson, L.H. [Atomic Energy of Canada Limited, Pinawa, Manitoba (Canada)

    1997-07-01

    The technical specifications for the composition of nuclear fuels and materials used in Canada's CANDU reactors have been developed by AECL and materials manufacturers, taking into account considerations specific to their manufacture and the effect of minor impurities on fuel behaviour in reactor. Nitrogen and chlorine are examples of UO{sub 2} impurities, however, where there is no technical specification limit. These impurities are present in the source materials or introduced in the fabrication process and are neutron activated to {sup 14}C and {sup 36}C1, which after {sup 129}I , are the two most significant contributors to dose in safety assessments for the disposal of used fuel. For certain impurities, environmental factors, particularly the safety of the disposal of used fuels, should be taken into consideration when deriving 'allowable' impurity limits for nuclear fuel materials. (author)

  9. New thoughts about old issues and old thoughts about new issues

    DEFF Research Database (Denmark)

    The large and growing literature on 'public engagement' has centred on now-familiar themes of science and democracy, critiques of the deficit theory, relations between the sciences and their publics, and the need to 'open up' scientific governance to wider social issues and concerns. In this paper......, we hope to suggest some new theoretical departures and perspectives on what has become an 'old' (but nevertheless significant) set of issues. How has the notion of 'engagement' migrated over time and what new meanings has 'engagement' acquired? What socio-technical arrangements are necessary...... for the performance of 'homo participatus' and how does this concept relate to more established notions of 'homo economicus'? When and how can it be said that the publics have 'engaged' - and what does this form of taking into account imply? Finally, what of the moral dimensions within STS accounts of engagement...

  10. Technical Writing 1987: Galloping Off in at Least Two Directions.

    Science.gov (United States)

    Stohrer, Freda F.

    Technical writing instructors generally agree about the absolute need for communication skills throughout the technological work place, but a survey of technical writing journal articles shows a lack of focus on ways to address business's needs for on-the-job literacy. One major advance within the profession in recent years has been the…

  11. The Doha Agricultural Market Access Negotiations: Remaining Conceptual, Practical, and Technical Issues

    OpenAIRE

    Wainio, John; Podbury, Troy

    2007-01-01

    Before the World Trade Organization's (WTO) Doha round of multilateral trade negotiations can be concluded negotiators will need to agree on a host of market access issues, including the size of tariff cuts, a methodology for opening tariff quotas in the case of products exempted from applying full tariff cuts, and the amount of flexibility to be provided under special and differential treatment for developing countries. Each of these issues harbours a number of complex problems that will hav...

  12. Assessment of the implementation issues for fuel cells in domestic and small scale stationary power generation and CHP applications

    Energy Technology Data Exchange (ETDEWEB)

    Graham, G.; Cruden, A.; Hart, J.

    2002-07-01

    This report discusses implementation issues associated with the use of fuel cells in <10 kW domestic, small-scale power generation and combined heat and power (CHP) operations in the UK. The report examines the key issues (fuel cell system standards and certification, fuel infrastructure, commercial issues and competing CHP technologies), before discussing non-technical issues including finance, ownership, import and export configuration, pricing structure, customer acceptability, installation, operation and training of servicing and commissioning personnel. The report goes on to discuss market and technical drivers, grid connection issues and solutions, operations and maintenance. Recommendations for the future are made.

  13. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  14. Exploring Pair Programming Benefits for MIS Majors

    Science.gov (United States)

    Dongo, Tendai; Reed, April H.; O'Hara, Margaret

    2016-01-01

    Pair programming is a collaborative programming practice that places participants in dyads, working in tandem at one computer to complete programming assignments. Pair programming studies with Computer Science (CS) and Software Engineering (SE) majors have identified benefits such as technical productivity, program/design quality, academic…

  15. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  16. 77 FR 3766 - PJM Interconnection, L.L.C.; Notice of Staff Technical Conference

    Science.gov (United States)

    2012-01-25

    ... Interconnection, L.L.C.; Notice of Staff Technical Conference On December 14, 2011, the Commission issued an order... Interconnection, L.L.C.'s (PJM) filing.\\1\\ Take notice that the technical conference will be held on February 14...\\ PJM Interconnection, L.L.C., 137 FERC ] 61,204 (2011) (December 14 Order). All interested parties are...

  17. 78 FR 13563 - Energy Conservation Program: Availability of the Preliminary Technical Support Document for...

    Science.gov (United States)

    2013-02-28

    ... identify and resolve issues involved in the preliminary analyses. Chapter 2 of the preliminary technical... DOE conducted in-depth technical analyses in the following areas for GSFLs and IRLs currently under... also begun work on the manufacturer impact analysis and identified the methods to be used for the LCC...

  18. Achievements of the IAEA technical working group on life management of nuclear power plants (TWG-LMNPP) under the chairmanship of Acad. Myrddin Davies

    International Nuclear Information System (INIS)

    Kang, K.-S.; Tipping, Philip

    2004-01-01

    This meeting, organised by CRISM-PROMETEY in St Petersburg, Russia, is held to honour the memory of Academician Myrddin Davies, who passed away due to a tragic road accident on 11 March 2003 in Stretton, England. Academician Myrddin Davies started technical collaboration with the IAEA in the early 1980s, and in 1985 became chairman of the International Working Group on Reliability of Reactor Pressure Components (IWG-RRPC). Under his chairmanship this grew to become the Technical Working Group on Life Management of Nuclear Power Plants (TWG-LMNPP) covering broader issues and with world wide collaboration. An insight to the creation, working methods and achievements of the TWG-LMNPP is given in this paper. Acad. Myrddin Davies was a competent chairman at many specialist meetings, major conferences hosted by IAEA, other European organizations and Nuclear Engineering International activities. The direction given to the TWG-LMNPP by Acad. Myrddin Davies is shown to have made a significant contribution to the safe use of nuclear energy. Major contributions to nuclear technology of the TWG-LMNPP, during the Chairmanship of Myrddin Davies, are thus cited

  19. Education Studies: Issues & Critical Perspectives

    Science.gov (United States)

    Kassem, Derek; Mufti, Emmanuel; Robinson, John

    2006-01-01

    This major text for Education Studies students provides a critical account of key issues in education today. The text features: (1) A critical analysis of key issues in Education Studies to encourage students' thinking about education in the broadest terms; (2) Themed sections with introductions to link the issues discussed in each chapter; (3)…

  20. Methods for communicating technical information as public information

    International Nuclear Information System (INIS)

    Zara, S.A.

    1987-01-01

    Many challenges face the nuclear industry, especially in the waste management area. One of the biggest challenges is effective communication with the general public. Technical complexity, combined with the public's lack of knowledge and negative emotional response, complicate clear communication of radioactive waste management issues. The purpose of this session is to present and discuss methods for overcoming these obstacles and effectively transmitting technical information as public information. The methods presented encompass audio, visual, and print approaches to message transmission. To support these methods, the author also discusses techniques, based on current research, for improving the communication process

  1. Assessment and management of ageing of major nuclear power plant components important to safety. Primary piping in PWRs

    International Nuclear Information System (INIS)

    2003-07-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (caused for instance by unanticipated phenomena and by operating, maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must therefore be effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling, within acceptable limits, the ageing degradation and wear out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. Since the reports are written from a safety perspective, they do not address life or life cycle management of plant components, which involves economic considerations. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), and water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and to provide a common technical basis for dialogue between plant operators and regulators when dealing with age-related licensing issues. The

  2. Proposal for outline of training and evaluation method for non-technical skills

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko; Shibue, Hisao

    2015-01-01

    The purpose of this study is to systematize measures for improvement of emergency response capability focused on non-technical skills. As the results of investigation of some emergency training in nuclear power plant and referring to CRM training, following two issues were picked up. 1) Lack of practical training method for improvement of non-technical skills. 2) Lack of evaluation method of non-technical skills. Then, based on these 7 non-technical skills 'situational awareness' 'decision making' 'communication' 'teamworking' 'leadership' 'managing stress' 'coping with fatigue' are promotion factors to improve emergency response capability, we propose practical training method for each non-technical skill. Also we give example of behavioral markers as evaluation factor, and indicate approaches to introduce the evaluation method of non-technical skills. (author)

  3. Technical and logistic provisions for the delivery of radioactive wastes in the final repository Konrad

    International Nuclear Information System (INIS)

    Poeppinghaus, Jens

    2013-01-01

    The beginning of radioactive waste delivery to the final repository Konrad is planned for 2019. The main issue for the technical and logistic provisions is the development of a concept for the transport of the licensed radioactive waste containers to the site, including a turning concept for cylindrical waste forms and planning, construction and manufacture of transport equipment. Further issues include a logistic concept considering specific boundary conditions as administrative processes, priorities, special features of the delivering institutions and technical requirements of the repository.

  4. Status report on roadmap headquarters issue resolution activities

    International Nuclear Information System (INIS)

    1993-01-01

    The Roadmap Project Office (RPO), under the Office of Planning (EM-14), continues to review headquarters (HQ) issues raised by the field in their roadmap documents. Currently, twenty-nine HQ issues are in the ''resolution'' process or are being defined for resolution. The resolution process involves an Environmental Restoration and Waste Management Program (EM) HQ person, the Action Officer (AO), as the leader in the resolution process. The RPO is responsible to EM-14 for reporting on the progress of issue resolution activities and also to provide contractor support to each Action Officer: the contractor support person is identifies as the Issue Resolution Facilitator (IF). Field contacts also are identified for each issue. This document provides current information on HQ issues actively in the ''resolution'' process or being defined for resolution. The issues are primarily institutional rather than technical and mainly involve regulatory, coordination, prioritization, policy and management concerns

  5. Implications of higher energy - summary of benefits, issues, commissioning cost, SEU, Cryo, QPS margins, Potential availability issues

    CERN Document Server

    Alemany, R

    2012-01-01

    The LHC is technically almost ready to run at 4 TeV per beam in 2012. Nevertheless, a review of the advantages and disadvantages of such an energy step should be carefully made before taking this decision. There fore, this paper will summarize the benefits from the physics point of view; the potential issues like a possible increase of Single Event Errors , Unidentified Flying Objects, or a significant decrease of the quench margin from beam losses that, all in all , could lead to availability issues, compromising the integrated luminosity. And last but not least, the commissioning cost will be addressed.

  6. Recent NRC research activities addressing valve and pump issues

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, D.L.

    1996-12-01

    The mission of the U.S. Nuclear Regulatory Commission (NRC) is to ensure the safe design, construction, and operation of commercial nuclear power plants and other facilities in the U.S.A. One of the main roles that the Office of Nuclear Regulatory Research (RES) plays in achieving the NRC mission is to plan, recommend, and implement research programs that address safety and technical issues deemed important by the NRC. The results of the research activities provide the bases for developing NRC positions or decisions on these issues. Also, RES performs confirmatory research for developing the basis to evaluate industry responses and positions on various regulatory requirements. This presentation summarizes some recent RES supported research activities that have addressed safety and technical issues related to valves and pumps. These activities include the efforts on determining valve and motor-operator responses under dynamic loads and pressure locking events, evaluation of monitoring equipment, and methods for detecting and trending aging of check valves and pumps. The role that RES is expected to play in future years to fulfill the NRC mission is also discussed.

  7. Dealing with completeness, structural hierarchy, and seismic coupling issues: three major challenges for #Fault2SHA

    Science.gov (United States)

    Valensise, Gianluca; Barba, Salvatore; Basili, Roberto; Bonini, Lorenzo; Burrato, Pierfrancesco; Carafa, Michele; Kastelic, Vanja; Fracassi, Umberto; Maesano, Francesco Emanuele; Tarabusi, Gabriele; Tiberti, Mara Monica; Vannoli, Paola

    2016-04-01

    The vast majority of active faulting studies are performed at the scale of individual, presumably seismogenic faults or fault strands. Most SHA approaches and models, however, require homogeneus information on potential earthquake sources over the entire tectonic domain encompassing the site(s) of interest. Although it is out of question that accurate SHA must rely on robust investigations of individual potential earthquake sources, it is only by gathering this information in regionally extensive databases that one can address some of the most outstanding issues in the use of #Fault2SHA. We will briefly recall three issues that are particularly relevant in the investigation of seismogenic faulting in southern Europe. A fundamental challenge is the completeness of the geologic record of active faulting. In most tectonic environments many potential seismogenic faults are blind or hidden, or deform the lower crust without leaving a discernible signal at the surface, or occur offshore, or slip so slowly that nontectonic erosional-depositional processes easily outpace their surface effects. Investigating only well-expressed faults is scientifically rewarding but also potentially misleading as it draws attention on the least insidious faults, leading to a potential underestimation of the regional earthquake potential. A further issue concerns the hierarchy of fault systems. Most active faults do not comprise seismogenic sources per se but are part of larger systems, and slip only in conjunction with the master fault of each system. In the most insidious cases, only secondary faults are expressed at the surface while the master fault lies hidden beneath them. This may result in an overestimation of the true number of seismogenic sources that occur in each region and in a biased identification of the characteristics of the main player in each system. Recent investigations of geologic and geodetic vs earthquake release budgets have shown that the "seismic coupling", which

  8. Policy issues in interconnecting networks

    Science.gov (United States)

    Leiner, Barry M.

    1989-01-01

    To support the activities of the Federal Research Coordinating Committee (FRICC) in creating an interconnected set of networks to serve the research community, two workshops were held to address the technical support of policy issues that arise when interconnecting such networks. The workshops addressed the required and feasible technologies and architectures that could be used to satisfy the desired policies for interconnection. The results of the workshop are documented.

  9. 42nd Plenary Meeting Report of the Scientific, Technical and Economic Committee for Fisheries (PLEN-13-01)

    DEFF Research Database (Denmark)

    Casey, J.; Abella, J. A.; Andersen, J.

    The Scientific, Technical and Economic Committee for Fisheries hold its 42nd plenary on 8-12 April 2013 in Brussels (Belgium). The terms of reference included both issues assessments of STECF Expert Working Group reports and additional requests submitted to the STECF by the Commission. Topics dea...... were inter alia assessments of Mediterranean Sea stocks, future EU data collection, and technical measures.......The Scientific, Technical and Economic Committee for Fisheries hold its 42nd plenary on 8-12 April 2013 in Brussels (Belgium). The terms of reference included both issues assessments of STECF Expert Working Group reports and additional requests submitted to the STECF by the Commission. Topics dealt...

  10. INMM Physical Protection Technical Working Group Workshops

    International Nuclear Information System (INIS)

    Williams, J.D.

    1982-01-01

    The Institute of Nuclear Materials Management (INMM) established the Physical Protection Technical Working Group to be a focal point for INMM activities related to the physical protection of nuclear materials and facilities. The Technical Working Group has sponsored workshops with major emphasis on intrusion detection systems, entry control systems, and security personnel training. The format for these workshops has consisted of a series of small informal group discussions on specific subject matter which allows direct participation by the attendees and the exchange of ideas, experiences, and insights. This paper will introduce the reader to the activities of the Physical Protection Technical Working Group, to identify the workshops which have been held, and to serve as an introduction to the following three papers of this session

  11. Technical issues and conservation conditions of medicines in the primary health care of the Brazilian Unified Health System

    Science.gov (United States)

    Costa, Ediná Alves; Araújo, Patrícia Sodré; Pereira, Marcelo Tavares; Souto, Ana Cristina; Souza, Gisélia Santana; Guerra, Augusto Afonso; Acurcio, Francisco de Assis; Guibu, Ione Aquemi; Alvares, Juliana; Costa, Karen Sarmento; Karnikowski, Margô Gomes de Oliveira; Soeiro, Orlando Mario; Leite, Silvana Nair

    2017-01-01

    ABSTRACT OBJECTIVE To characterize the technical issues and conditions of medicines conservation in Primary Health Care of Brazilian regions, responsible for pharmacy/dispensing unit profile; environmental, storage, and dose fractioning conditions; inventory control and waste management; fire and electrical failure safety items; transportation problems; advertising regulation; and pharmacovigilance. METHODS This article is part of the Pesquisa Nacional sobre Acesso, Utilização e Promoção do Uso Racional de Medicamentos – Serviços (National Survey on Access, Use and Promotion of Rational Use of Medicines – Services)–, a cross-sectional and exploratory study, of evaluative nature, consisting of an information survey within a representative sample of municipalities, stratified by Brazilian regions, which constitute the study domains, and a sample of Primary Health Care services. Pharmaceutical services (PS) were directly observed with photographic record and face-to-face interviews with those responsible for the dispensing of medicines and over the telephone with those responsible for pharmaceutical services. Data were processed with the SPSS® software version 21. RESULTS The investigated dimensions showed relevant deficiencies and inequalities between the regions, generally more favorable in the Southeast and Midwest regions and weaker in the Northeast and North regions. We verified non-compliance with technical requirements and conditions essential to the conservation of medicines, which may interfere with the maintenance of stability and, thus, on their quality, efficacy, and safety. The regulation of advertising/promotion of medicines is still incipient and there is some progress in the structuring of mechanisms regarding pharmacovigilance. CONCLUSIONS The sanitary situation of medicines in Brazilian Primary Health Care is alarming due to the violation of the specific sanitary legislation for dispensing establishments and due to a wide range of

  12. LeBreton Flats district heating: Institutional issues

    Energy Technology Data Exchange (ETDEWEB)

    Gerow, L.B.; Bernstein, H.

    1981-12-01

    Despite the growing popularity in Europe of district heating as an alternative to conventional systems, a number of institutional barriers blocked the road to its successful implementation in Canada. These hurdles include questions of ownership, operation/administration, consumer accountability, financial arrangements, and general consumer acceptance of a new technology. In deciding on ownership, the major issues were legal. Provincial laws to be complied with included The Municipal Franchises Act, The Public Utilities Act, The Municipal Act and The Ontario Municipal Board Act. The operation and administration of the project were also beset with legal complications. The relevant laws were The Boilers and Pressure Vessels Act, and The Environmental Assessment Act. How to charge individual users (consumer accountability) raised a number of technical problems including metering and rate-setting for hot water distribution, and heat borrowing between units. The report recommends that groups planning to implement district heating are advised to allow plenty of lead time for obtaining approvals and franchising arrangements so as not to jeopardize construction schedules. 3 refs.

  13. Technical issues relating to the statistical parametric mapping of brain SPECT studies

    International Nuclear Information System (INIS)

    Hatton, R.L.; Cordato, N.; Hutton, B.F.; Lau, Y.H.; Evans, S.G.

    2000-01-01

    Full text: Statistical Parametric Mapping (SPM) is a software tool designed for the statistical analysis of functional neuro images, specifically Positron Emission Tomography and functional Magnetic Resonance Imaging, and more recently SPECT. This review examines some problems associated with the analysis of SPECT. A comparison of a patient group with normal studies revealed factors that could influence results, some that commonly occur, others that require further exploration. To optimise the differences between two groups of subjects, both spatial variability and differences in global activity must be minimised. The choice and effectiveness of co registration method and approach to normalisation of activity concentration can affect the optimisation. A small number of subject scans were identified as possessing truncated data resulting in edge effects that could adversely influence the analysis. Other problems included unusual areas of significance possibly related to reconstruction methods and the geometry associated with nonparallel collimators. Areas of extra cerebral significance are a point of concern - and may result from scatter effects, or mis registration. Difficulties in patient positioning, due to postural limitations, can lead to resolution differences. SPM has been used to assess areas of statistical significance arising from these technical factors, as opposed to areas of true clinical significance when comparing subject groups. This contributes to a better understanding of the effects of technical factors so that these may be eliminated, minimised, or incorporated in the study design. Copyright (2000) The Australian and New Zealand Society of Nuclear Medicine Inc

  14. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  15. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  16. The Agency's technical co-operation activities in 1992

    International Nuclear Information System (INIS)

    1993-08-01

    This report on the International Atomic Energy Agency's Technical Co-operation Activities in 1992 contains an overview of the general issues involved, including both in-house and external developments, resources and delivery, and evaluation of programs; an overview by field of activity and by division within the Agency; an overview by geographic area, distinguishing (i) Africa, (ii) Asia and the Pacific, (iii) Latin America, (iv) and the Middle East and Europe; an overview by component (i.e., experts, equipment, fellowships, training courses, sub-contracts and miscellaneous); and an overview by fund technical assistance and co-operation fund, extrabudgetary resources, United Nations Development Program (UNDP), assistance in kind. It also contains a profile on technical co-operation activities in Latin America. Projects concluded during 1992 are listed together with a description of their achievements. It concludes with implementation summaries. 10 figs, 9 tabs

  17. Technical/institutional prerequisite for nuclear forensics response framework

    International Nuclear Information System (INIS)

    Tamai, Hiroshi; Okubo, Ayako; Kimura, Yoshiki; Kokaji, Lisa; Shinohara, Nobuo; Tomikawa, Hirofumi

    2016-01-01

    Nuclear Forensics capability has been developed under the international collaborations. For its effective function, technical development in analysis of seized nuclear materials as well as the institutional development in comprehensive response framework are required under individual national responsibility. In order to keep the “chain of custody” in the proper operation of sample collection at the event scene, radiological analysis at the laboratory, storage of the samples, and further inspection and trial, close cooperation and information sharing between relevant organisations are essential. IAEA issues the Implementing Guide to provide the model action plan and assists individual national development. Some countries at the advancing stage of national response framework, promote the international cooperation for the technical improvement and awareness cultivation. Examples in such national developments will be introduced and prospective technical/institutional prerequisite for nuclear forensics response framework will be studied. (author)

  18. Issues for the long term management of radioactive waste

    International Nuclear Information System (INIS)

    Schneider, T.; Schieber, C.; Lavelle, S.

    2006-01-01

    High-level radioactive waste are currently managed in interim storage installations, providing an adequate protection of the public and the workers for the short term period. However, the long-term persistence of the radioactivity of the waste gives a new timescale dimension, never experimented by the society for the development of protection systems. In the framework of the European Commission research project 'COWAM-2' (COmmunity WAste Management) dedicated to the governance of radioactive waste management, the issues of 'long term governance' have been addressed by exploring the elements which can contribute to a better integration of the technical and societal time dimensions, taking into account technical, ethical, economic and organizational considerations. The originality of this project is to address the various issues within working groups involving stakeholders from different origins and European countries together with a research team. After a discussion on the time dimensions to be taken into account from the technical and societal perspective, this paper presents, mainly based on the findings of the COWAM-2 project, a brief analysis of the ethical criteria to be considered when future generations are concerned as well as some performance criteria regarding long term governance. Finally, it proposes a discussion on the interest for the radiation protection experts to engage a process with stakeholders concerned by radioactive waste management in order to favour the emergence of a sustainable management responding to the issues at stake and including radiation protection considerations for long term periods. (authors)

  19. Future Directions for Research on Online Technical Education

    Science.gov (United States)

    Horvitz, Brian S.

    2017-01-01

    Most research on online learning in higher education has been focused on general education at four-year institutions. There is a need for more research that focuses on online and hybrid education at community colleges in technical education fields. This issue includes articles from eight National Science Foundation funded projects doing innovative…

  20. Major hazards onshore and offshore

    International Nuclear Information System (INIS)

    1992-01-01

    This symposium continues the tradition of bringing together papers on a topic of current interest and importance in terms of process safety - in this case, Major Hazards Onshore and Offshore. Lord Cullen in his report on the Piper Alpha disaster has, in effect, suggested that the experience gained in the control of major hazards onshore during the 1980s should be applied to improve safety offshore during the 1990s. This major three-day symposium reviews what has been learned so far with regard to major hazards and considers its present and future applications both onshore and offshore. The topics covered in the programme are wide ranging and deal with all aspects of legislation, the application of regulations, techniques for evaluating hazards and prescribing safety measures in design, construction and operation, the importance of the human factors, and recent technical developments in protective measures, relief venting and predicting the consequences of fires and explosions. (author)