WorldWideScience

Sample records for major schedule milestones

  1. California LLW disposal site development update: Ahead of milestone schedule

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1987-01-01

    US Ecology has been designated by the State of California to locate, develop and operate a low-level radioactive waste disposal facility. In early 1986, the firm identified eighteen desert basins in southeastern California for siting consideration. Three candidate sites were selected for detailed field characterization work in February, 1987. A preferred site for licensing purposes will be identified in early 1988. California is currently ahead of the siting milestone schedule mandated by the Low-Level Radioactive Waste Policy Amendments Act. It is likely that a license application will be filed before the 1990 milestone date. This paper describes the process undertaken by US Ecology to identify three candidates sites for characterization, and the public involvement program supporting this decision. Future activities leading to final site development are also described

  2. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  3. Completion milestones

    International Nuclear Information System (INIS)

    Westbury, G.D.

    1995-01-01

    The Southeastern Environmental Resources Alliance (SERA) is a joint effort between the US Department of Energy, the states of Georgia and South Carolina, and Westinghouse US Department of Energy, the states of Georgia Savannah River Company (WSRC). The original proposal for SERA, submitted under the Technology Reinvestment Project (TRP), is based on improving the competitiveness of manufacturers within Georgia and South Carolina by addressing the costs associated with environmental and waste management issues. By using the many technologies available through the national laboratories, universities, the Savannah River Site, and the commercial sector, SERA will improve the competitive position of companies that would otherwise have no access to those technologies. This Start-Up Plan details the steps SERA will take to begin effective operations by June 1, 1995, and will focus on the short-term needs of the program. This plan will serve as a supplement to the original SERA proposal, and will address the major milestones included in the Department of Energy's Cooperative Agreement. Also documented are the planning processes that SERA will use to ensure the long-term viability of the program. The planning process will include additional work elements that are referenced by the original proposal, but, for the purposes of program start-up, are not immediately addressed. The major milestones and schedules are provided for each goal

  4. Tilecal meets two major milestones

    CERN Multimedia

    Cavalli-Sforza, M.

    Over the last two months the Tile Calorimeter passed not one but two major milestones. In early May, the last of the 64 modules that make up one of the two Extended Barrels arrived at CERN from IFAE-Barcelona, equipped with optical components and tested. And during the Overview Week in Clermont-Ferrand, the last of the 64 Barrel modules, mechanically assembled, arrived from JINR-Dubna. Just a brief reminder: the ATLAS Tile Calorimeter is composed of 3 cylinders ("barrels") of steel, scintillating tiles and optical fibers, altogether about 12 m long, with an outer diameter of 8.4 m, and weighing about 2700 tons. The central cavity will contain the Liquid Argon cryostats, and the whole calorimetry system will measure the direction and energy of jets produced at the LHC, as well as the missing transverse energy, which as everyone knows is one of the telltale signals of new and exciting physics. Each of the three cylinders is divided azimuthally into 64 modules - much like the slices of an orange. The modules ar...

  5. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  6. Overview of Milestone E activities, greater confinement than shallow land burial

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1981-01-01

    In summary, the objective of Milestone E is to provide the technology and documentation needed to open a site providing greater confinement than shallow land burial. To that end, ORNL has prepared a technical position paper defining greater confinement disposal, options for achieving it, and the need for this disposal technology. In order to meet the objective of the milestones, the LLWMP evaluated the full range of options to shallow land burial and decided to focus on a combination of greater depth solidification containment and engineered barriers. The program identified a series of research needs and then focused program efforts on resolving those needs. These tasks are proceeding on schedule at this time but budget reductions may have an impact on our ability to maintain the schedule

  7. Developmental Milestones

    Science.gov (United States)

    ... visit this page: About CDC.gov . Learn the Signs Home Milestones 2 months 4 months 6 months 9 months 1 year 18 months 2 years 3 years 4 years 5 years Milestone Tracker App Milestones in Action: Photos & Videos 2 months ...

  8. Infant developmental milestones and adult intelligence

    DEFF Research Database (Denmark)

    Flensborg-Madsen, Trine; Mortensen, Erik Lykke

    2015-01-01

    Intelligence Scale (WAIS). Associations between motor developmental milestones and IQwere analysed bymultiple linear regression adjusting for potential confounding factors. Results: Later acquisition of infant developmental milestones was associated with lower subsequent IQ, and the majority of significant......Background: A number of studies suggest a positive association between faster infant motor development and intellectual function in childhood and adolescence. However, studies investigating the relationship between infant motor development and intelligence in adulthood are lacking. Aims......: To investigate whether age at achievement of 12 motor developmental milestones was associated with adult intelligence and to evaluate the influence of sex, parental social status, parity,mother's cigarette consumption in the last trimester, gestational age, birthweight, and birth length on this association...

  9. Milestoning with coarse memory

    Science.gov (United States)

    Hawk, Alexander T.

    2013-04-01

    Milestoning is a method used to calculate the kinetics of molecular processes occurring on timescales inaccessible to traditional molecular dynamics (MD) simulations. In the method, the phase space of the system is partitioned by milestones (hypersurfaces), trajectories are initialized on each milestone, and short MD simulations are performed to calculate transitions between neighboring milestones. Long trajectories of the system are then reconstructed with a semi-Markov process from the observed statistics of transition. The procedure is typically justified by the assumption that trajectories lose memory between crossing successive milestones. Here we present Milestoning with Coarse Memory (MCM), a generalization of Milestoning that relaxes the memory loss assumption of conventional Milestoning. In the method, milestones are defined and sample transitions are calculated in the standard Milestoning way. Then, after it is clear where trajectories sample milestones, the milestones are broken up into distinct neighborhoods (clusters), and each sample transition is associated with two clusters: the cluster containing the coordinates the trajectory was initialized in, and the cluster (on the terminal milestone) containing trajectory's final coordinates. Long trajectories of the system are then reconstructed with a semi-Markov process in an extended state space built from milestone and cluster indices. To test the method, we apply it to a process that is particularly ill suited for Milestoning: the dynamics of a polymer confined to a narrow cylinder. We show that Milestoning calculations of both the mean first passage time and the mean transit time of reversal—which occurs when the end-to-end vector reverses direction—are significantly improved when MCM is applied. Finally, we note the overhead of performing MCM on top of conventional Milestoning is negligible.

  10. Developmental milestones record

    Science.gov (United States)

    Growth milestones for children; Normal childhood growth milestones; Childhood growth milestones ... activity in response Walks while holding on to furniture or other support Toddler -- 1 to 3 years ...

  11. Milestoning with transition memory

    Science.gov (United States)

    Hawk, Alexander T.; Makarov, Dmitrii E.

    2011-12-01

    Milestoning is a method used to calculate the kinetics and thermodynamics of molecular processes occurring on time scales that are not accessible to brute force molecular dynamics (MD). In milestoning, the conformation space of the system is sectioned by hypersurfaces (milestones), an ensemble of trajectories is initialized on each milestone, and MD simulations are performed to calculate transitions between milestones. The transition probabilities and transition time distributions are then used to model the dynamics of the system with a Markov renewal process, wherein a long trajectory of the system is approximated as a succession of independent transitions between milestones. This approximation is justified if the transition probabilities and transition times are statistically independent. In practice, this amounts to a requirement that milestones are spaced such that trajectories lose position and velocity memory between subsequent transitions. Unfortunately, limiting the number of milestones limits both the resolution at which a system's properties can be analyzed, and the computational speedup achieved by the method. We propose a generalized milestoning procedure, milestoning with transition memory (MTM), which accounts for memory of previous transitions made by the system. When a reaction coordinate is used to define the milestones, the MTM procedure can be carried out at no significant additional expense as compared to conventional milestoning. To test MTM, we have applied its version that allows for the memory of the previous step to the toy model of a polymer chain undergoing Langevin dynamics in solution. We have computed the mean first passage time for the chain to attain a cyclic conformation and found that the number of milestones that can be used, without incurring significant errors in the first passage time is at least 8 times that permitted by conventional milestoning. We further demonstrate that, unlike conventional milestoning, MTM permits

  12. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  13. Exact milestoning

    International Nuclear Information System (INIS)

    Bello-Rivas, Juan M.; Elber, Ron

    2015-01-01

    A new theory and an exact computer algorithm for calculating kinetics and thermodynamic properties of a particle system are described. The algorithm avoids trapping in metastable states, which are typical challenges for Molecular Dynamics (MD) simulations on rough energy landscapes. It is based on the division of the full space into Voronoi cells. Prior knowledge or coarse sampling of space points provides the centers of the Voronoi cells. Short time trajectories are computed between the boundaries of the cells that we call milestones and are used to determine fluxes at the milestones. The flux function, an essential component of the new theory, provides a complete description of the statistical mechanics of the system at the resolution of the milestones. We illustrate the accuracy and efficiency of the exact Milestoning approach by comparing numerical results obtained on a model system using exact Milestoning with the results of long trajectories and with a solution of the corresponding Fokker-Planck equation. The theory uses an equation that resembles the approximate Milestoning method that was introduced in 2004 [A. K. Faradjian and R. Elber, J. Chem. Phys. 120(23), 10880-10889 (2004)]. However, the current formulation is exact and is still significantly more efficient than straightforward MD simulations on the system studied

  14. US central station nuclear electric generating units: significant milestones (status as of January 1, 1979)

    International Nuclear Information System (INIS)

    1979-03-01

    Construction and operational milestones are tabulated for US nuclear power plants. Data are presented on nuclear steam supply system orders. A schedule of commercial operation and projected capital costs through 1990 is given

  15. Milestone-specific, Observed data points for evaluating levels of performance (MODEL) assessment strategy for anesthesiology residency programs.

    Science.gov (United States)

    Nagy, Christopher J; Fitzgerald, Brian M; Kraus, Gregory P

    2014-01-01

    Anesthesiology residency programs will be expected to have Milestones-based evaluation systems in place by July 2014 as part of the Next Accreditation System. The San Antonio Uniformed Services Health Education Consortium (SAUSHEC) anesthesiology residency program developed and implemented a Milestones-based feedback and evaluation system a year ahead of schedule. It has been named the Milestone-specific, Observed Data points for Evaluating Levels of performance (MODEL) assessment strategy. The "MODEL Menu" and the "MODEL Blueprint" are tools that other anesthesiology residency programs can use in developing their own Milestones-based feedback and evaluation systems prior to ACGME-required implementation. Data from our early experience with the streamlined MODEL blueprint assessment strategy showed substantially improved faculty compliance with reporting requirements. The MODEL assessment strategy provides programs with a workable assessment method for residents, and important Milestones data points to programs for ACGME reporting.

  16. Yucca Mountain Milestone

    International Nuclear Information System (INIS)

    Hunt, Rod

    1997-01-01

    The Department of Energy project to determine if the Yucca Mountain site in Nevada is suitable for geologic disposal of high-level nuclear waste reached a major milestone in late April when a 25-foot-diameter tunnel boring machine ''holed through'' completing a five-mile-long, horseshoe-shaped excavation through the mountain. When the cutting-head of the giant machine broke through to daylight at the tunnel's south portal, it ended a 2 1/2-year excavation through the mountain that was completed ahead of schedule and with an outstanding safety record. Video of the event was transmitted live by satellite to Washington, DC, where it was watched by Secretary of Energy Frederico Pena and other high-level DOE officials, signifying the importance of the project's mission to find a repository for high-level nuclear waste and spent nuclear fuel produced by nuclear power plants. This critical undertaking is being performed by DOE's Office of Civilian Radioactive Waste Management (OCRWM). The tunnel is the major feature of the Exploratory Studies Facility (ESF), which serves as an underground laboratory for engineers and scientists to help determine if Yucca Mountain is suitable to serve as a repository for the safe disposal of high-level nuclear waste. Morrison Knudsen's Environmental/Government Group is providing design and construction-management services on the project. The MK team is performing final design for the ESF and viability assessment design for the underground waste repository that will be built only if the site is found suitable for such a mission. In fact, if at anytime during the ESF phase, the site is found unsuitable, the studies will be stopped and the site restored to its natural state

  17. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  18. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  19. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  20. ALMA Achieves Major Milestone With Antenna-Link Success

    Science.gov (United States)

    2007-03-01

    The Atacama Large Millimeter/submillimeter Array (ALMA), an international telescope project, reached a major milestone on March 2, when two ALMA prototype antennas were first linked together as an integrated system to observe an astronomical object. The milestone achievement, technically termed "First Fringes," came at the ALMA Test Facility (ATF) on the grounds of the National Radio Astronomy Observatory's (NRAO) Very Large Array (VLA) radio telescope in New Mexico. NRAO is a facility of the National Science Foundation (NSF), managed by Associated Universities, Incorporated (AUI). AUI also is designated by NSF as the North American Executive for ALMA. ALMA Test Facility ALMA Test Facility, New Mexico: VertexRSI antenna, left; AEC antenna, right. CREDIT: Drew Medlin, NRAO/AUI/NSF Click on image for page of graphics and full information Faint radio waves emitted by the planet Saturn were collected by the two ALMA antennas, then processed by new, state-of-the-art electronics to turn the two antennas into a single, high-resolution telescope system, called an interferometer. Such pairs of antennas are the basic building blocks of multi-antenna imaging systems such as ALMA and the VLA. In such a system, each antenna is combined electronically with every other antenna to form a multitude of pairs. Each pair contributes unique information that is used to build a highly-detailed image of the astronomical object under observation. When completed in 2012, ALMA will have 66 antennas. The successful Saturn observation began at 7:13 p.m., U.S. Mountain Time Friday (0213 UTC Saturday). The planet's radio emissions at a frequency of 104 GigaHertz (GHz) were tracked by the ALMA system for more than an hour. "Our congratulations go to the dedicated team of scientists, engineers and technicians who produced this groundbreaking achievement for ALMA. Much hard work and many long hours went into this effort, and we appreciate it all. This team should be very proud today," said NRAO

  1. Drive theory and home run milestones in baseball: an historical analysis.

    Science.gov (United States)

    Goldschmied, Nadav; Harris, Michael; Vira, Damien; Kowalczyk, Jason

    2014-02-01

    The purpose of this investigation was to test whether the performance of the home run hitters in Major League Baseball adhered to predictions of Drive Theory. 24 baseball players who have hit at least 505 home runs were included in the sample. Their performance was assessed around the time in which they reached a significant home run career milestone, operationalized as either 500 or 600 home runs, or surpassing the league's home run record. As predicted, the players were found to require significantly more at-bats to complete the 5 home runs before the milestone, when stress was assumed to be mounting, than the 5 home runs after the milestone. In contrast, those players who reached the personal landmark from 1988 (the suspected commencement of the so-called "Steroid Era") onwards required the same number of at-bats before and after the milestone.

  2. A pilot study of orthopaedic resident self-assessment using a milestones' survey just prior to milestones implementation.

    Science.gov (United States)

    Bradley, Kendall E; Andolsek, Kathryn M

    2016-01-11

    To pilot test if Orthopaedic Surgery residents could self-assess their performance using newly created milestones, as defined by the Accreditation Council on Graduate Medical Education. In June 2012, an email was sent to Program Directors and administrative coordinators of the 154 accredited Orthopaedic Surgery Programs, asking them to send their residents a link to an online survey. The survey was adapted from the Orthopaedic Surgery Milestone Project. Completed surveys were aggregated in an anonymous, confidential database. SAS 9.3 was used to perform the analyses. Responses from 71 residents were analyzed. First and second year residents indicated through self-assessment that they had substantially achieved Level 1 and Level 2 milestones. Third year residents reported they had substantially achieved 30/41, and fourth year residents, all Level 3 milestones. Fifth year, graduating residents, reported they had substantially achieved 17 Level 4 milestones, and were extremely close on another 15. No milestone was rated at Level 5, the maximum possible. Earlier in training, Patient Care and Medical Knowledge milestones were rated lower than the milestones reflecting the other four competencies of Practice Based Learning and Improvement, Systems Based Practice, Professionalism, and Interpersonal Communication. The gap was closed by the fourth year. Residents were able to successfully self-assess using the 41 Orthopaedic Surgery milestones. Respondents' rate improved proficiency over time. Graduating residents report they have substantially, or close to substantially, achieved all Level 4 milestones. Milestone self-assessment may be a useful tool as one component of a program's overall performance assessment strategy.

  3. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  4. FITARA Milestones

    Data.gov (United States)

    Social Security Administration — Fulfills OMB's requirement to submit an update on progress of actions/milestones that were listed in SSA's FITARA Implementation Plan. This JSON file allows OMB to...

  5. Low-level radioactive waste management in New York State: Meeting the milestones

    International Nuclear Information System (INIS)

    White, I.L.

    1987-01-01

    The federal Low-Level Radioactive Waste Policy Act of 1980 made the states responsible for disposal of low-level radioactive waste (LLRW) generated within their borders. After extensive hearings and public participation, New York State enacted a Radioactive Waste Management Act (State LLRWMA) in July 1986. This paper describes New York's program and reviews the State's progress in complying with the milestone established by Public Law 99-240. A number of concerns about LLRW disposal and the schedule calling for a facility to be operational by January 1, 1993, are also discussed

  6. Immunization Milestones: A More Comprehensive Picture of Age-Appropriate Vaccination

    Directory of Open Access Journals (Sweden)

    Steve G. Robison

    2010-01-01

    Full Text Available A challenge facing immunization registries is developing measures of childhood immunization coverage that contain more information for setting policy than present vaccine series up-to-date (UTD rates. This study combined milestone analysis with provider encounter data to determine when children either do not receive indicated immunizations during medical encounters or fail to visit providers. Milestone analysis measures immunization status at key times between birth and age 2, when recommended immunizations first become late. The immunization status of a large population of children in the Oregon ALERT immunization registry and in the Oregon Health Plan was tracked across milestone ages. Findings indicate that the majority of children went back and forth with regard to having complete age-appropriate immunizations over time. We also found that immunization UTD rates when used alone are biased towards relating non-UTD status to a lack of visits to providers, instead of to provider visits on which recommended immunizations are not given.

  7. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  8. The Pension Fund passes important milestones

    CERN Document Server

    2012-01-01

    In this column, the Chairman of the Pension Fund Governing Board (PFGB) presents the Board's latest main decisions, initiatives and accomplishments to the Fund's members and beneficiaries.   Since my last report in October, the PFGB has passed several milestones in actuarial, technical and investment matters. The PFGB has completed an analysis of a request by the European Organisation for Astronomical Research in the Southern Hemisphere (ESO) to reduce the increased cost of pension insurance for new ESO recruits that has been caused by the increased CHF/€ exchange ratio. Currently the staff of ESO are admitted to the CERN Pension Fund, pursuant to a co-operation agreement between CERN and ESO dating back to 1968. This analysis assessed the actuarial, financial, administrative and legal implications, and is scheduled to be presented to the CERN Council and the Finance Committee in December. After an open tendering process the PFGB has selected Buck Consultants Limited...

  9. There is variability in the attainment of developmental milestones in the CDKL5 disorder.

    Science.gov (United States)

    Fehr, Stephanie; Leonard, Helen; Ho, Gladys; Williams, Simon; de Klerk, Nick; Forbes, David; Christodoulou, John; Downs, Jenny

    2015-01-01

    Individuals with the CDKL5 disorder have been described as having severely impaired development. A few individuals have been reported having attained more milestones including walking and running. Our aim was to investigate variation in attainment of developmental milestones and associations with underlying genotype. Data was sourced from the International CDKL5 Disorder Database, and individuals were included if they had a pathogenic or probably pathogenic CDKL5 mutation and information on early development. Kaplan-Meier time-to-event analyses investigated the occurrence of developmental milestones. Mutations were grouped by their structural/functional consequence, and Cox regression was used to investigate the relationship between genotype and milestone attainment. The study included 109 females and 18 males. By 5 years of age, only 75% of the females had attained independent sitting and 25% independent walking whilst a quarter of the males could sit independently by 1 year 3 months. Only one boy could walk independently. No clear relationship between mutation group and milestone attainment was present, although females with a late truncating mutation attained the most milestones. Attainment of developmental milestones is severely impaired in the CDKL5 disorder, with the majority who did attain skills attaining them at a late age. It appears as though males are more severely impaired than the females. Larger studies are needed to further investigate the role of genotype on clinical variability.

  10. Important Milestone for REX-ISOLDE

    CERN Multimedia

    2001-01-01

    CERN's new nuclear physics facility, REX-ISOLDE, reached an important milestone on Thursday 23 August. Scheduled for full commissioning later this year, REX-ISOLDE will take beams of unstable ions from the ISOLDE facility and accelerate them, opening up a wide range of new research avenues. Members of the REX-ISOLDE team with REXEBIS - successfully tested last week. The key to REX-ISOLDE is the process of accumulating and cooling unstable ions in a trap and then stripping them of electrons in a so-called charge breeder before accelerating them in a linear accelerator. The first part of this process is the job of REXTRAP, the largest particle trap of its kind, which was successfully tested in 1999 (Bulletin 49/99). Last week it was the turn of REXEBIS (Electron Beam Ion Source), which strips the ions of electrons, to be put through its paces. By increasing the charge of the ions by removing electrons, the length of the linear accelerator needed to accelerate the ions can be reduced, since higher charge mean...

  11. Milestones in welding technology

    Science.gov (United States)

    Dolby, Richard E.

    2013-09-01

    Sir Alan's PhD thesis describes his research into cracking during arc welding of armour steels. Throughout his career, he had a strong interest in defects of all types, how they formed in metallic structures and how the larger ones could be detected and sized by non-destructive techniques. He was also vitally concerned with how defects impacted on the engineering integrity of welded structures, particularly the risk of fracture in nuclear plant. This study presents a view of some of the major milestones in global welding technology that took place over the 60 or more years of Sir Alan's career and highlights those where he had a personal and direct involvement.

  12. UI researchers celebrate latest milestone in construction of atom smasher

    CERN Multimedia

    2007-01-01

    University of Iowa researchers joined their U.S. and international colleagues Dec. 19 in celebrating a major construction mile-stone that brings them one step closer to the completion of the most powerful device ever designed to search for the basic build-ing blocks of matter.

  13. Milestones in pressure vessel technology

    International Nuclear Information System (INIS)

    Spence, J.; Nash, D.H.

    2004-01-01

    The progress of pressure vessel technology over the years has been influenced by many important events. This paper identifies a number of 'milestones' which have provided a stimulus to analysis methods, manufacturing, operational processes and new pressure equipment. The formation of a milestone itself along with its subsequent development is often critically dependent on the work of many individuals. It is postulated that such developments takes place in cycles, namely, an initial idea, followed sometimes by unexpected failures, which in turn stimulate analysis or investigation, and when confidence is established, followed finally by the emergence of codes ad standards. Starting from the industrial revolution, key milestones are traced through to the present day and beyond

  14. Shortening the Miles to the Milestones: Connecting EPA-Based Evaluations to ACGME Milestone Reports for Internal Medicine Residency Programs.

    Science.gov (United States)

    Choe, John H; Knight, Christopher L; Stiling, Rebekah; Corning, Kelli; Lock, Keli; Steinberg, Kenneth P

    2016-07-01

    The Next Accreditation System requires internal medicine training programs to provide the Accreditation Council for Graduate Medical Education (ACGME) with semiannual information about each resident's progress in 22 subcompetency domains. Evaluation of resident "trustworthiness" in performing entrustable professional activities (EPAs) may offer a more tangible assessment construct than evaluations based on expectations of usual progression toward competence. However, translating results from EPA-based evaluations into ACGME milestone progress reports has proven to be challenging because the constructs that underlay these two systems differ.The authors describe a process to bridge the gap between rotation-specific EPA-based evaluations and ACGME milestone reporting. Developed at the University of Washington in 2012 and 2013, this method involves mapping EPA-based evaluation responses to "milestone elements," the narrative descriptions within the columns of each of the 22 internal medicine subcompetencies. As faculty members complete EPA-based evaluations, the mapped milestone elements are automatically marked as "confirmed." Programs can maintain a database that tallies the number of times each milestone element is confirmed for a resident; these data can be used to produce graphical displays of resident progress along the internal medicine milestones.Using this count of milestone elements allows programs to bridge the gap between faculty assessments of residents based on rotation-specific observed activities and semiannual ACGME reports based on the internal medicine milestones. Although potentially useful for all programs, this method is especially beneficial to large programs where clinical competency committee members may not have the opportunity for direct observation of all residents.

  15. UI researchers celebrate latest milestone in construction of atom smasher

    CERN Multimedia

    2007-01-01

    "University of Iowa researchers joined their U.S. and international colleagues De. 19 in celebrating a major construction mile-stone that brings them one step closer to the completion of the most powerful device ever designed to search for the basic build-ing blocks of matter." (1/2 page)

  16. The IEEE Milestone event at CERN

    CERN Multimedia

    2005-01-01

    On the initiative of its French and Swiss Sections, the IEEE has honoured CERN with an 'IEEE Milestone in the history of electricity and electronics' for the invention of the multi-wire proportional chamber in 1968. The IEEE established the Electrical Engineering Milestones programe in 1983 to honour significant achievements in the history of electrical and electronics engineering. To be designated, an achievement must be at least 25 years old, must have involved a unique solution to an engineering problem, and must have had at least regional impact. Currently there are more than  50 IEEE Milestones around the world. http://www.ieee.org/organizations/history_center/cern.html The installation and unveiling of this IEEE Milestone will provide the opportunity to emphasize the close relationship between science, technology, industry and well-being in society.  A ceremony, organised with the support of a group of IEEE members working at CERN, will be held at the CERN Globe of Science and Inn...

  17. Important ATLAS Forward Calorimeter Milestone Reached

    CERN Document Server

    Loch, P.

    The ATLAS Forward Calorimeter working group has reached an important milestone in the production of their detectors. The mechanical assembly of the first electromagnetic module (FCal1C) has been completed at the University of Arizona on February 25, 2002, only ten days after the originally scheduled date. The photo shows the University of Arizona FCal group in the clean room, together with the assembled FCal1C module. The module consists of a stack of 18 round copper plates, each about one inch thick. Each plate is about 90 cm in diameter, and has 12260 precision-drilled holes in it, to accommodate the tube/rod electrode assembly. The machining of the plates, which was done at the Science Technology Center (STC) at Carleton University, Ottawa, Canada, required high precision to allow for easy insertion of the electrode copper tube. The plates have been carefully cleaned at the University of Arizona, to remove any machining residue and metal flakes. This process alone took about eleven weeks. Exactly 122...

  18. Weld characterization of RAFM steel. EBP structural materials milestone 3

    Energy Technology Data Exchange (ETDEWEB)

    Alamo, A. [Service de Recherches Metallurgiques Appliquees, CEA Centre d' Etudes Nucleaires de Saclay, Saclay (France); Fontes, A. [Service de Techniques Avancees, CEA Centre d' Etudes Nucleaires de Saclay, Saclay (France); Schaefer, L. [Forschungszentrum Karlsruhe, Karlsruhe (Germany); Gauthier, A.; Tavassoli, A.A. [CEA Centre d' Etudes Nucleaires de Saclay, Saclay (France); Van Osch, E.V.; Van der Schaaf [ed.] [ECN Netherlands Energy Research Foundation, Petten (Netherlands)

    1999-07-01

    In the long term part of the European Fusion technology programme welding of reduced activation ferritic martensitic (RAFM)steels takes a prominent place. The blanket structures are complex and welding is an important element in manufacturing procedures. In the 95-98 program several Structural Materials tasks of the European Blanket Project are devoted to welding of RAFM steels. In the milestone 3 defined for the program a review of the weld characterization was foreseen in 1998. The present report gives the status of tasks and the major conclusions and recommendations of the welding milestone meeting. The major conclusion is that defect free GTAW (Gas Tungsten Arc Welding), EBW (Electron Beam Welding) and diffusion welds can be accomplished, but further work is needed to assure quantitatively the service boundary conditions. Also for irradiated steel additional work is recommended for the 99-02 period. Development of filler wire material for the European reference RAFM: EUROFER97 is necessary. Establishment of weldability tests must be settled in the next period also. 14 refs.

  19. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    Science.gov (United States)

    1987-09-15

    LOGISTIC SUPPORT (ILS) COST ESTIMATE SCODE NUMBER: NONE -ESPONSIBILITY: ROY & ILS ’,!,RATION: 22.00 WORK DAYS A-221 * .9 ..- 9 * PAGE: .LSMTEST SCHEDULE: CE...0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...RESPONSIBILITY: BELVOIR LAB DURATION: 20.00 WORK DAYS ENG DE I SCHEDULE: DV ENGINEERING DESIGN INITIATED. CODE NUMBER: NONE RESPONSIBILITY: BELVOIR LAB

  20. Tri-Party Agreement Milestone M-45-07A; complete evaluation of subsurface barrier feasibility: Summary report

    Energy Technology Data Exchange (ETDEWEB)

    Cox, G.E.; Peters, B.B.; Treat, R.L. [Enserch Environmental Corp., Richland, WA (United States); Bazinet, G.D.; Cruse, J.M.; Hampsten, K.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-09-01

    The US Department of Energy (DOE) has established the Tank Waste Remediation System (TWRS) program to safely manage and dispose the low-level and high-level radioactive and hazardous wastes currently held in 177 tanks and approximately 1,900 sealed capsules located on the Hanford Site. The remediation of the entire Hanford Site is being conducted under the Hanford Federal Facility Agreement and Consent Order, otherwise known as the Tri-Party Agreement. The three parties that concluded the agreement are the DOE, the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The purpose of the Tri-Party Agreement is to ensure that Hanford Site activities are performed in a manner that protects the public health, welfare, and the environment. The agreement provides a framework and structure for the many different agencies and regulations under which work is performed on the Site, listing responsibilities and attaching scheduled dates of completion for minimum performances (known as milestones). The Tri-Party Agreement Milestone M-45-07A requires that an assessment of the feasibility of subsurface barriers to support retrieval of tank waste be performed. The activities to meet this milestone have been completed, and are documented herein.

  1. Tri-Party Agreement Milestone M-45-07A; complete evaluation of subsurface barrier feasibility: Summary report

    International Nuclear Information System (INIS)

    Cox, G.E.; Peters, B.B.; Treat, R.L.; Bazinet, G.D.; Cruse, J.M.; Hampsten, K.L.

    1994-09-01

    The US Department of Energy (DOE) has established the Tank Waste Remediation System (TWRS) program to safely manage and dispose the low-level and high-level radioactive and hazardous wastes currently held in 177 tanks and approximately 1,900 sealed capsules located on the Hanford Site. The remediation of the entire Hanford Site is being conducted under the Hanford Federal Facility Agreement and Consent Order, otherwise known as the Tri-Party Agreement. The three parties that concluded the agreement are the DOE, the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The purpose of the Tri-Party Agreement is to ensure that Hanford Site activities are performed in a manner that protects the public health, welfare, and the environment. The agreement provides a framework and structure for the many different agencies and regulations under which work is performed on the Site, listing responsibilities and attaching scheduled dates of completion for minimum performances (known as milestones). The Tri-Party Agreement Milestone M-45-07A requires that an assessment of the feasibility of subsurface barriers to support retrieval of tank waste be performed. The activities to meet this milestone have been completed, and are documented herein

  2. Science of health care delivery milestones for undergraduate medical education.

    Science.gov (United States)

    Havyer, Rachel D; Norby, Suzanne M; Leep Hunderfund, Andrea N; Starr, Stephanie R; Lang, Tara R; Wolanskyj, Alexandra P; Reed, Darcy A

    2017-08-25

    The changing healthcare landscape requires physicians to develop new knowledge and skills such as high-value care, systems improvement, population health, and team-based care, which together may be referred to as the Science of Health Care Delivery (SHCD). To engender public trust and confidence, educators must be able to meaningfully assess physicians' abilities in SHCD. We aimed to develop a novel set of SHCD milestones based on published Accreditation Council for Graduate Medical Education (ACGME) milestones that can be used by medical schools to assess medical students' competence in SHCD. We reviewed all ACGME milestones for 25 specialties available in September 2013. We used an iterative, qualitative process to group the ACGME milestones into SHCD content domains, from which SHCD milestones were derived. The SHCD milestones were categorized within the current ACGME core competencies and were also mapped to Association of American Medical Colleges' Entrustable Professional Activities (AAMC EPAs). Fifteen SHCD sub-competencies and corresponding milestones are provided, grouped within ACGME core competencies and mapped to multiple AAMC EPAs. This novel set of milestones, grounded within the existing ACGME competencies, defines fundamental expectations within SHCD that can be used and adapted by medical schools in the assessment of medical students in this emerging curricular area. These milestones provide a blueprint for SHCD content and assessment as ongoing revisions to milestones and curricula occur.

  3. Milestone Completion Report WBS 1.3.5.05 ECP/VTK-m FY17Q4 [MS-17/03-06] Key Reduce / Spatial Division / Basic Advect / Normals STDA05-4.

    Energy Technology Data Exchange (ETDEWEB)

    Moreland, Kenneth D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-30

    The FY17Q4 milestone of the ECP/VTK-m project includes the completion of a key-reduce scheduling mechanism, a spatial division algorithm, an algorithm for basic particle advection, and the computation of smoothed surface normals. With the completion of this milestone, we are able to, respectively, more easily group like elements (a common visualization algorithm operation), provide the fundamentals for geometric search structures, provide the fundamentals for many flow visualization algorithms, and provide more realistic rendering of surfaces approximated with facets.

  4. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  5. Adapting planning and scheduling concepts to an engineering perspective: Key issues and successful techniques

    International Nuclear Information System (INIS)

    Finnegan, J.M.

    1986-01-01

    Traditional approaches to engineering planning are slanted toward the formats and interests of downstream implementation, and do not always consider the form and criticality of the front-end engineering development process. These processes and scopes are less defined and more subjective than most construction and operations tasks, and require flexible scheduling methods. This paper discusses the characteristics and requirement of engineering schedules, presents concepts for approaching planning in this field, and illustrates simple methods for developing and analyzing engineering plans, and evaluating schedule performance. Engineering plans are structured into a schedule hierarchy which delineates appropriate control and responsibilities, and is governed by key evaluation and decision milestones. Schedule risk analysis considers the uncertainty of engineering tasks, and critical resource constraints. Methods to evaluate schedule performance recognize that engineers and managers are responsible for adequate planning and forecasting, and quality decisions, even if they cannot control all factors influencing schedule results

  6. Verteporfin: a milestone in opthalmology and photodynamic therapy.

    Science.gov (United States)

    Brown, S B; Mellish, K J

    2001-02-01

    During the past year, a photosensitiser named benzoporphyrin derivative (BPD) has been approved in 26 countries under the generic name verteporfin (Visudynetrade mark, Novartis), for the treatment of patients with a certain type of the wet form of age-related macular degeneration (AMD) by photodynamic therapy (PDT). AMD is the leading cause of blindness in the developed world, with approximately half a million new cases of the wet form per year. The approval of Visudynetrade mark therapy represents a major milestone in ophthalmology since AMD was previously untreatable by any modality which would preserve existing vision. It was also a milestone in the development of PDT, not only because it represented the first breakthrough in the use of PDT to treat an otherwise untreatable condition, but also because it represented the first mass market for a PDT treatment where prospects of a substantial financial return on many years of investment appear to be likely. In this article, we look at the background to the development of BPD, primarily for its use in AMD, but also in other applications.

  7. ECP Milestone Report WBS 2.3.4.13 ECP/VTK-m FY18Q1 [MS-18/01-03] Multiblock / Gradients / Release STDA05-5.

    Energy Technology Data Exchange (ETDEWEB)

    Moreland, Kenneth D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pugmire, David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Geveci, Berk [Kitware, Inc., Clifton Park, NY (United States)

    2017-12-01

    The FY18Q1 milestone of the ECP/VTK-m project includes the implementation of a multiblock data set, the completion of a gradients filtering operation, and the release of version 1.1 of the VTK-m software. With the completion of this milestone, the new multiblock data set allows us to iteratively schedule algorithms on composite data structures such as assemblies or hierarchies like AMR. The new gradient algorithms approximate derivatives of fields in 3D structures with finite differences. Finally, the release of VTK-m version 1.1 tags a stable release of the software that can more easily be incorporated into external projects.

  8. The pathology milestones and the next accreditation system.

    Science.gov (United States)

    Naritoku, Wesley Y; Alexander, C Bruce; Bennett, Betsy D; Black-Schaffer, W Stephen; Brissette, Mark D; Grimes, Margaret M; Hoffman, Robert D; Hunt, Jennifer L; Iezzoni, Julia C; Johnson, Rebecca; Kozel, Jessica; Mendoza, Ricardo M; Post, Miriam D; Powell, Suzanne Z; Procop, Gary W; Steinberg, Jacob J; Thorsen, Linda M; Nestler, Steven P

    2014-03-01

    In the late 1990s, the Accreditation Council for Graduate Medical Education developed the Outcomes Project and the 6 general competencies with the intent to improve the outcome of graduate medical education in the United States. The competencies were used as the basis for developing learning goals and objectives and tools to evaluate residents' performance. By the mid-2000s the stakeholders in resident education and the general public felt that the Outcomes Project had fallen short of expectations. To develop a new evaluation method to track trainee progress throughout residency using benchmarks called milestones. A change in leadership at the Accreditation Council for Graduate Medical Education brought a new vision for the accreditation of training programs and a radically different approach to the evaluation of residents. The Pathology Milestones Working Group reviewed examples of developing milestones in other specialties, the literature, and the Accreditation Council for Graduate Medical Education program requirements for pathology to develop pathology milestones. The pathology milestones are a set of objective descriptors for measuring progress in the development of competency in patient care, procedural skill sets, medical knowledge, practice-based learning and improvement, interpersonal and communication skills, professionalism, and systems-based practice. The milestones provide a national standard for evaluation that will be used for the assessment of all residents in Accreditation Council for Graduate Medical Education-accredited pathology training programs.

  9. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  10. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  11. Variations in Sexual Identity Milestones among Lesbians, Gay Men and Bisexuals

    Science.gov (United States)

    Martos, Alexander; Nezhad, Sheila; Meyer, Ilan H.

    2016-01-01

    Despite a large body of literature covering sexual identity development milestones, we know little about differences or similarities in patterns of identity development among subgroups of the lesbian, gay, and bisexual (LGB) population. For this study, we assessed identity milestones for 396 LGB New Yorkers, ages 18–59. Sexual identity and disclosure milestones, were measured across gender, sexual identity, race/ethnicity, and age cohort subgroups of the LGB sample. Men experienced most sexual identity milestones earlier than women, but they tended to take more time between milestones. LGBs in younger age cohorts experienced sexual identity milestones and disclosure milestones earlier than the older cohorts. Bisexual people experienced sexual identity and disclosure milestones later than gay and lesbian people. Timing of coming out milestones did not differ by race/ethnicity. By comparing differences within subpopulations, the results of this study help build understanding of the varied identity development experiences of people who are often referred to collectively as “the LGB community.” LGB people face unique health and social challenges; a more complete understanding of variations among LGB people allows health professionals and social service providers to provide services that better fit the needs of LGB communities. PMID:27695579

  12. Noise-induced hearing loss milestones: Past and future

    CSIR Research Space (South Africa)

    Edwards, A

    2011-01-01

    Full Text Available At the 2003 Mine Health and Safety Summit, the milestones for elimination of Noise-induced Hearing Loss (NIHL) in the mining industry were agreed on. The first milestone, December 2008, has passed and the next one in 2013 is looming. The study...

  13. Associations of Early Developmental Milestones with Adult Intelligence

    Science.gov (United States)

    Flensborg-Madsen, Trine; Mortensen, Erik L.

    2018-01-01

    The study investigated whether age at attainment of 20 developmental milestones within the areas of language, walking, eating, dressing, social interaction, and toilet training was associated with adult intelligence. Mothers of 821 children of the Copenhagen Perinatal Cohort recorded 20 developmental milestones at a 3-year examination, and all…

  14. A milestone for the Three Gorges

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Rushu [China Yangzte Three Gorges Project Development Corp., Yichang Hubei (China)

    1999-10-01

    Massive flooding of the Yangtze river in 1998 was a serious cause for concern. The Three Gorges river diversion dam project will reduce the danger. The three construction stages are described. A major milestone was the closure of the Yangtze in 1997 and this was effectively the completion of Stage I. Stage II is construction of the earth-rock cofferdam as a temporary reservoir and the key factor for safe construction of the main stage II works in the dry pit. The cofferdam was filled to flood control elevation and up to July 1998 three peak floods had been handled successfully. Work is in hand for dealing with even higher floods. The 17-year scheme is due for completion in 2009. (UK)

  15. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    Science.gov (United States)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  16. Birth Cohort Differences in Sexual Identity Development Milestones among HIV-Negative Gay and Bisexual Men in the United States.

    Science.gov (United States)

    Grov, Christian; Rendina, H Jonathon; Parsons, Jeffrey T

    2017-10-12

    The coming-out process for gay and bisexual men (GBM) involves crossing sexual identity development (SID) milestones: (1) self-awareness of sexual attraction to the same sex, (2) self-acceptance of an identity as gay or bisexual, (3) disclosure of this sexual identity to others, and (4) having sex with someone of the same sex. We examined trends in SID milestones by birth cohort in a 2015 U.S. national sample of GBM (n = 1,023). Birth cohort was independent of when men first felt sexually attracted to someone of the same sex (median age 11 to 12). However, with the exception of age of first same-sex attraction, older cohorts tended to pass other milestones at later ages than younger cohorts. Latent class analysis (LCA) of SID milestone patterns identified three subgroups. The majority (84%) began sexual identity development with same-sex attraction around the onset of puberty (i.e., around age 10) and progressed to self-identification, same-sex sexual activity, and coming out-in that order. The other two classes felt same-sex attraction during teen years (ages 12.5 to 18.0) but achieved the remaining SID milestones later in life. For 13% of men, this was during early adulthood; for 3% of men, this was in middle adulthood. Findings highlight the need to monitor ongoing generational differences in passing SID milestones.

  17. Pediatric Program Director Minimum Milestone Expectations before Allowing Supervision of Others and Unsupervised Practice.

    Science.gov (United States)

    Li, Su-Ting T; Tancredi, Daniel J; Schwartz, Alan; Guillot, Ann; Burke, Ann E; Trimm, R Franklin; Guralnick, Susan; Mahan, John D; Gifford, Kimberly

    2018-04-25

    The Accreditation Council for Graduate Medical Education requires semiannual Milestone reporting on all residents. Milestone expectations of performance are unknown. Determine pediatric program director (PD) minimum Milestone expectations for residents prior to being ready to supervise and prior to being ready to graduate. Mixed methods survey of pediatric PDs on their programs' Milestone expectations before residents are ready to supervise and before they are ready to graduate, and in what ways PDs use Milestones to make supervision and graduation decisions. If programs had no established Milestone expectations, PDs indicated expectations they considered for use in their program. Mean minimum Milestone level expectations adjusted for program size, region, and clustering of Milestone expectations by program were calculated for prior to supervise and prior to graduate. Free-text questions were analyzed using thematic analysis. The response rate was 56.8% (113/199). Most programs had no required minimum Milestone level before residents are ready to supervise (80%; 76/95) or ready to graduate (84%; 80/95). For readiness to supervise, minimum Milestone expectations PDs considered establishing for their program were highest for humanism (2.46, 95% CI: 2.21-2.71) and professionalization (2.37, 2.15-2.60). Minimum Milestone expectations for graduates were highest for help-seeking (3.14, 2.83-3.46). Main themes included the use of Milestones in combination with other information to assess learner performance and Milestones are not equally weighted when making advancement decisions. Most PDs have not established program minimum Milestones, but would vary such expectations by competency. Copyright © 2018. Published by Elsevier Inc.

  18. Practical Implications for an Effective Radiology Residency Quality Improvement Program for Milestone Assessment.

    Science.gov (United States)

    Leddy, Rebecca; Lewis, Madelene; Ackerman, Susan; Hill, Jeanne; Thacker, Paul; Matheus, Maria; Tipnis, Sameer; Gordon, Leonie

    2017-01-01

    Utilization of a radiology resident-specific quality improvement (QI) program and curriculum based on the Accreditation Council for Graduate Medical Education (ACGME) milestones can enable a program's assessment of the systems-based practice component and prepare residents for QI implementation post graduation. This article outlines the development process, curriculum, QI committee formation, and resident QI project requirements of one institution's designated radiology resident QI program. A method of mapping the curriculum to the ACGME milestones and assessment of resident competence by postgraduate year level is provided. Sample projects, challenges to success, and lessons learned are also described. Survey data of current trainees and alumni about the program reveal that the majority of residents and alumni responders valued the QI curriculum and felt comfortable with principles and understanding of QI. The most highly valued aspect of the program was the utilization of a resident education committee. The majority of alumni responders felt the residency quality curriculum improved understanding of QI, assisted with preparation for the American Board of Radiology examination, and prepared them for QI in their careers. In addition to the survey results, outcomes of resident project completion and resident scholarly activity in QI are evidence of the success of this program. It is hoped that this description of our experiences with a radiology resident QI program, in accordance with the ACGME milestones, may facilitate the development of successful QI programs in other diagnostic radiology residencies. Copyright © 2017 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.

  19. Associations of early developmental milestones with adult intelligence

    DEFF Research Database (Denmark)

    Flensborg-Madsen, Trine; Mortensen, Erik Lykke

    2018-01-01

    developmental milestones at a 3-year examination, and all children were administered the Wechsler Adult Intelligence Scale when they were 20–34 years old. Later attainment of a number of milestones was associated with lower adult IQ with the strongest associations found for those related to language and social......The study investigated whether age at attainment of 20 developmental milestones within the areas of language, walking, eating, dressing, social interaction, and toilet training was associated with adult intelligence. Mothers of 821 children of the Copenhagen Perinatal Cohort recorded 20...... interaction. The adjusted full-scale IQ means were 107.0, 101.8, and 100.6 for being able to form a sentence at less than 24 months, at 24 months, and later than 24 months....

  20. Timing of motor milestones achievement and development of overweight in childhood

    DEFF Research Database (Denmark)

    Morgen, Camilla Schmidt; Andersen, Anne-Marie Nybo; Due, P

    2014-01-01

    WHAT IS ALREADY KNOWN ABOUT THIS SUBJECT: The risk of childhood obesity is influenced by a number of pre- and post-natal factors. The risk of childhood obesity is correlated with body weight during infancy, which might be related to the psychomotor development of the child. The previous literature...... on motor milestones and childhood overweight is limited and results are inconsistent. WHAT THIS STUDY ADDS: Weight status in early life and timing of achievement of gross motor milestones (the ability to sit and walk) are largely independent of each other. Timing of achievement of motor milestones in early...... life does not predict overweight or increased BMI later in childhood. BACKGROUND: Overweight may hinder achievement of gross motor milestones and delayed achievement of milestones may increase the risk of later overweight for reasons involving physical activity and the building of lean body mass...

  1. CERN receives prestigious Milestone recognition from IEEE

    CERN Multimedia

    2005-01-01

    The Nobel prize winner Georges Charpak and W. Cleon Anderson, IEEE President, unveil the Milestone bronze plaques. At a ceremony on 26 September at the Globe of Science and Innovation, Mr W. Cleon Anderson, President of the Institute of Electrical and Electronics Engineers (IEEE) formally dedicated Milestone plaques recognising the invention of electronic particle detectors at CERN. The plaque were unveiled by Mr Anderson and Georges Charpak, the Nobel-prize winning inventor of wire chamber technology at CERN in 1968. The IEEE is the world's largest professional association dedicated to the advancement of technology with 365,000 individual members in over 150 countries. Established in 1983, there are currently over 60 Milestones around the world. They honour momentous achievements in the history of electrical and electronics engineering, such as the landing of the first transatlantic cable, code breaking at Bletchley Park during World War II, and the development of the Japanese Bullet train, the Tokaido Shin...

  2. Charting the Road to Competence: Developmental Milestones for Internal Medicine Residency Training

    Science.gov (United States)

    Green, Michael L.; Aagaard, Eva M.; Caverzagie, Kelly J.; Chick, Davoren A.; Holmboe, Eric; Kane, Gregory; Smith, Cynthia D.; Iobst, William

    2009-01-01

    Background The Accreditation Council for Graduate Medical Education (ACGME) Outcome Project requires that residency program directors objectively document that their residents achieve competence in 6 general dimensions of practice. Intervention In November 2007, the American Board of Internal Medicine (ABIM) and the ACGME initiated the development of milestones for internal medicine residency training. ABIM and ACGME convened a 33-member milestones task force made up of program directors, experts in evaluation and quality, and representatives of internal medicine stakeholder organizations. This article reports on the development process and the resulting list of proposed milestones for each ACGME competency. Outcomes The task force adopted the Dreyfus model of skill acquisition as a framework the internal medicine milestones, and calibrated the milestones with the expectation that residents achieve, at a minimum, the “competency” level in the 5-step progression by the completion of residency. The task force also developed general recommendations for strategies to evaluate the milestones. Discussion The milestones resulting from this effort will promote competency-based resident education in internal medicine, and will allow program directors to track the progress of residents and inform decisions regarding promotion and readiness for independent practice. In addition, the milestones may guide curriculum development, suggest specific assessment strategies, provide benchmarks for resident self-directed assessment-seeking, and assist remediation by facilitating identification of specific deficits. Finally, by making explicit the profession's expectations for graduates and providing a degree of national standardization in evaluation, the milestones may improve public accountability for residency training. PMID:21975701

  3. Influences on achieving motor milestones: A twin-singleton study

    NARCIS (Netherlands)

    Brouwer, S.I.; van Beijsterveldt, C.E.M.; Bartels, M.; Hudziak, J.; Boomsma, D.I.

    2006-01-01

    In order to determine if twinning impacted achievement of motor milestones the attainment of early motor milestones in twins was examined and compared to published data from singletons of the same age from the same culture and birth years. We examined the influence of twinning, sex, zygosity and

  4. ATDM Rover Milestone Report STDA02-1 (FY2017 Q4)

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Matt [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Laney, Dan E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    We have successfully completed the MS-4/Y1 Milestone STDA02-1 for the Rover Project. This document describes the milestone and provides an overview of the technical details and artifacts of the milestone. This milestone is focused on building a GPU accelerated ray tracing package capable of doing multi-group radiography, both back-lit and with self-emission as well as serving as a volume rendering plot in VisIt and other VTK-based visualization tools. The long term goal is a package with in-situ capability, but for this first version integration into VisIt is the primary goal. Milestone Execution Plan: Create API for GPU Raytracer that supports multi-group transport (up to hundreds of groups); Implement components into one or more of: VTK-m, VisIt, and a new library/package implementation to be hosted on LLNL Bitbucket (initially), before releasing to the wider community.

  5. Developmental milestones record - 4 months

    Science.gov (United States)

    ... are expected to develop certain physical and mental skills. These skills are called milestones. Information All children develop a ... your child's health care provider. PHYSICAL AND MOTOR SKILLS The typical 4-month-old baby should: Slow ...

  6. Development and evaluation of standardized narrative cases depicting the general surgery professionalism milestones.

    Science.gov (United States)

    Rawlings, Arthur; Knox, Aaron D C; Park, Yoon Soo; Reddy, Shalini; Williams, Sarah R; Issa, Nabil; Jameel, Abid; Tekian, Ara

    2015-08-01

    Residency programs now are required to use educational milestones, which has led to the need for new methods of assessment. The literature suggests that narrative cases are a promising tool to track residents' progress. This study demonstrates the process for developing and evaluating narrative cases representing the five levels of the professionalism milestones. In 2013, the authors identified 28 behaviors in the Accreditation Council for Graduate Medical Education general surgery professionalism milestones. They modified previously published narrative cases to fit these behaviors. To evaluate the quality of these cases, the authors developed a 28-item, five-point scale instrument, which 29 interdisciplinary faculty completed. The authors compared the faculty ratings by narrative case and specialty with the authors' initial rankings of the cases by milestone level. They used t tests and analysis of variance to compare mean scores across specialties. The authors developed 10 narrative cases, 2 for each of the 5 milestone levels. Each case contained at least 20 of the 28 behaviors identified in the milestones. Mean faculty ratings matched the milestone levels. Reliability was good (G coefficient = 0.86, phi coefficient = 0.85), indicating consistency in raters' ability to determine the proper milestone level for each case. The authors demonstrate a process for using specialty-specific milestones to develop narrative cases that map to a spectrum of professionalism behaviors. This process can be applied to other competencies and specialties to facilitate faculty awareness of resident performance descriptors and provide a frame of reference for milestones assessment.

  7. Benchmarking of OEM Hybrid Electric Vehicles at NREL: Milestone Report

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K. J.; Rajagopalan, A.

    2001-10-26

    A milestone report that describes the NREL's progress and activities related to the DOE FY2001 Annual Operating Plan milestone entitled ''Benchmark 2 new production or pre-production hybrids with ADVISOR.''

  8. Adolescent predictors of emerging adulthood milestones in youth with spina bifida.

    Science.gov (United States)

    Zukerman, Jill M; Devine, Katie A; Holmbeck, Grayson N

    2011-04-01

    To examine the predictive utility of demographic (illness status and SES), individual (neurocognitive functioning and intrinsic motivation), and family-based (parental intrusiveness) factors during adolescence on the achievement of emerging adulthood milestones in youth with and without spina bifida (SB). Questionnaire and observational data were collected from 14/15-year-old adolescents with SB, typically developing peers, mothers, and teachers. Emerging adulthood milestones (i.e., leaving home, attending college, employment, romantic relationship experience, and number of friendships) were assessed at ages 18/19 years in the full sample and subset of youth who graduated from high school. Typically, developing youth were more likely to achieve milestones compared to youth with SB in the full sample but not when only high school graduates were compared. Executive function, SES, intrinsic motivation, and parental intrusiveness emerged as significant predictors for particular milestones. Interventions targeting executive function, intrinsic motivation, and parenting behavior may facilitate achievement of emerging adulthood milestones.

  9. Mapping Direct Observations From Objective Structured Clinical Examinations to the Milestones Across Specialties.

    Science.gov (United States)

    Baker-Genaw, Kimberly; Kokas, Maria S; Ahsan, Syed F; Darnley-Fisch, Deborah; Drake, Sean; Goyal, Nikhil; Inamdar, Kedar; Moutzouros, Vasilios; Prabhakar, Deepak; Rolland, Laurie; Sangha, Roopina; Shreve, Maria; Woodward, Ann

    2016-07-01

    Little is known about residents' performance on the milestones at the institutional level. Our institution formed a work group to explore this using an institutional-level curriculum and residents' evaluation of the milestones. We assessed whether beginner-level milestones for interpersonal and communication skills (ICS) related to observable behaviors in ICS-focused objective structured clinical examinations (OSCEs) for postgraduate year (PGY) 1 residents across specialties. The work group compared ICS subcompetencies across 12 programs to identify common beginner-level physician-patient communication milestones. The selected ICS milestone sets were compared for common language with the ICS-OSCE assessment tool-the Kalamazoo Essential Elements of Communication Checklist-Adapted (KEECC-A). To assess whether OSCE scores related to ICS milestone scores, all PGY-1 residents from programs that were part of Next Accreditation System Phase 1 were identified; their OSCE scores from July 2013 to June 2014 and ICS subcompetency scores from December 2014 were compared. The milestones for 10 specialties and the transitional year had at least 1 ICS subcompetency that related to physician-patient communication. The language of the ICS beginner-level milestones appears similar to behaviors outlined in the KEECC-A. All 60 residents with complete data received at least a beginner-level ICS subcompetency score and at least a satisfactory score on all 3 OSCEs. The ICS-OSCE scores for PGY-1 residents appear to relate to beginner-level milestones for physician-patient communication across multiple specialties.

  10. Level-1 Milestone 350 Definitions v1

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, T

    2006-11-17

    This milestone is the direct result of work that started seven years ago with the planning for a 100-teraFLOP platform and will be satisfied when 100 teraFLOPS is placed in operation and readied for Stockpile Stewardship Program simulations. The end product of this milestone will be a production-level, high-performance computing system, code named Purple, designed to be used to solve the most demanding stockpile stewardship problems, that is, the large-scale application problems at the edge of our understanding of weapon physics. This fully functional 100 teraFLOPS system must be able to serve a diverse scientific and engineering workload. It must also have a robust code development and production environment, both of which facilitate the workload requirements. This multi-year effort includes major activities in contract management, facilities, infrastructure, system software, and user environment and support. Led by LLNL, the trilabs defined the statement of work for a 100-teraFLOP system that resulted in a contract with IBM known as the Purple contract. LLNL worked with IBM throughout the contract period to resolve issues and collaborated with the Program to resolve contractual issues to ensure delivery of a platform that best serves the Program for a reasonable cost. The Purple system represents a substantial increase in the classified compute resources at LLNL for NNSA. The center computer environment must be designed to accept the Purple system and to scale with the increase of compute resources to achieve required end-to-end services. Networking, archival storage, visualization servers, global file systems, and system software will all be enhanced to support Purple's size and architecture. IBM and LLNL are sharing responsibility for Purple's system software. LLNL is responsible for the scheduler, resource manager, and some code development tools. Through the Purple contract, IBM is responsible for the remainder of the system software including the

  11. A multi-source feedback tool for measuring a subset of Pediatrics Milestones.

    Science.gov (United States)

    Schwartz, Alan; Margolis, Melissa J; Multerer, Sara; Haftel, Hilary M; Schumacher, Daniel J

    2016-10-01

    The Pediatrics Milestones Assessment Pilot employed a new multisource feedback (MSF) instrument to assess nine Pediatrics Milestones among interns and subinterns in the inpatient context. To report validity evidence for the MSF tool for informing milestone classification decisions. We obtained MSF instruments by different raters per learner per rotation. We present evidence for validity based on the unified validity framework. One hundred and ninety two interns and 41 subinterns at 18 Pediatrics residency programs received a total of 1084 MSF forms from faculty (40%), senior residents (34%), nurses (22%), and other staff (4%). Variance in ratings was associated primarily with rater (32%) and learner (22%). The milestone factor structure fit data better than simpler structures. In domains except professionalism, ratings by nurses were significantly lower than those by faculty and ratings by other staff were significantly higher. Ratings were higher when the rater observed the learner for longer periods and had a positive global opinion of the learner. Ratings of interns and subinterns did not differ, except for ratings by senior residents. MSF-based scales correlated with summative milestone scores. We obtain moderately reliable MSF ratings of interns and subinterns in the inpatient context to inform some milestone assignments.

  12. myTIPreport and Training for Independent Practice: A Tool for Real-Time Workplace Feedback for Milestones and Procedural Skills.

    Science.gov (United States)

    Connolly, AnnaMarie; Goepfert, Alice; Blanchard, Anita; Buys, Elizabeth; Donnellan, Nicole; Amundsen, Cindy L; Galvin, Shelley L; Kenton, Kimberly

    2018-02-01

    Few tools currently exist for effective, accessible delivery of real-time, workplace feedback in the clinical setting. We developed and implemented a real-time, web-based tool for performance-based feedback in the clinical environment. The tool (myTIPreport) was designed for performance-based feedback to learners on the Accreditation Council for Graduate Medical Education (ACGME) Milestones and procedural skills. "TIP" stands for "Training for Independent Practice." We implemented myTIPreport in obstetrics and gynecology (Ob-Gyn) and female pelvic medicine and reconstructive surgery (FPMRS) programs between November 2014 and May 2015. Residents, fellows, teachers, and program directors completed preimplementation and postimplementation surveys on their perceptions of feedback. Preimplementation surveys were completed by 656 participants of a total of 980 learners and teachers in 19 programs (12 Ob-Gyn and 7 FPMRS). This represented 72% (273 of 378) of learners and 64% (383 of 602) of teachers. Seventy percent of participants (381 of 546) reported having their own individual processes for real-time feedback; the majority (79%, 340 of 430) described these processes as informal discussions . Over 6 months, one-third of teachers and two-thirds of learners used the myTIPreport tool a total of 4311 times. Milestone feedback was recorded 944 times, and procedural feedback was recorded 3367 times. Feedback addressed all ACGME Milestones and procedures programmed into myTIPreport. Most program directors reported that tool implementation was successful. The majority of learners successfully received workplace feedback using myTIPreport. This web-based tool, incorporating procedures and ACGME Milestones, may be an important transition from other feedback formats.

  13. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Science.gov (United States)

    2010-07-01

    ... SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business... milestone payment amounts? (a) If you select the milestone payment method (see § 37.805), you must assess... needs for carrying out that phase of the research effort. (b) The Federal share at each milestone need...

  14. Retail market opening plan : key activities and milestones to market opening on May 1, 2002

    International Nuclear Information System (INIS)

    2002-01-01

    The Ontario Energy Board (OEB) published its Retail Market Readiness Plan in January 2000 with particular focus on what is needed by distributors to become ready for self certification on December 14, 2001. The market opening date has now been set for May 1, 2002 so the framework has been updated to focus on what is needed to open the electricity market to retail competition. This report describes the activities required for the opening of the retail electricity market with reference to the activities that the participants, distributors and retailers need to complete to properly interact at market opening. The measures that other organizations such as EBT hubs should take were also identified for cases where the measures involve cooperation and interaction with distributors and retailers to ensure a smooth transition to competition within the industry. While schedules of individual organizations will vary, market participants should try to align with the overall framework at key milestones. The mandatory requirements associated with milestones were included in Appendix B. These included requirements for: market opening baseline; market readiness activities; participant systems and organizational preparations; loading of new rates into systems; cutover to new systems by market participants; data scrubbing; multiple contract resolution; pre-market processing; distributor-retailer service agreement; retail prudential posting; inter-participant testing; contingency arrangements; stability period; and, market opening. Appendix A includes the Market Opening Gantt Chart. 1 tab

  15. Plan and schedule for disposition and regulatory compliance for miscellaneous streams. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    On December 23, 1991, the U.S. Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code (WAC) 173-216 (State Waste Discharge Permit Program) or WAC 173-218 (Washington Underground Injection Control Program) where applicable. Hanford Site liquid effluent streams discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams Phase II Streams Miscellaneous Streams. Phase I and Phase II Streams are addressed in two RL reports: open-quotes Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Siteclose quotes (DOE-RL 1987), and open-quotes Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Siteclose quotes. Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams. The disposition process for the Miscellaneous Streams is facilitated using a decision tree format. The decision tree and corresponding analysis for determining appropriate disposition of these streams is presented in this document

  16. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  17. Site management system executive summary report -- March 1995

    International Nuclear Information System (INIS)

    Schultz, E.A.

    1995-03-01

    Performance data for March 1995 reflects a continued unfavorable schedule variance and favorable cost variance. The March fiscal-year-to-date (FYTD) schedule variance is an unfavorable $105.5M. EM-30 (Office of Waste Management) is the biggest contributor ($81.9 million) to the behind-schedule condition. The majority of the EM-30 schedule variance is associated with the Tank Waste Remediation System (TWRS) program. A breakdown of individual program performance is listed on page 6. The TWRS schedule variance totals a negative $63.0 million and is attributed to the delay in receiving key decision 0 (KD-0) for Project W-314, open-quotes Tank Farm Restoration and Safe Operationsclose quotes; the delay in receiving KD-3 for Project W-320, open-quotes 106-C Sluicingclose quotes; late deployment of the rotary and push mode sampling trucks due to equipment and operational issues; late placement of melter contracts; and the Multi-Function Waste Tank Facility (MWTF) workscope still being a part of the baseline. Class I change requests are in process to rebaseline the activities associated with KDs. An aggressive sampling schedule has been developed for the rotary and push mode sampling activity. Thirty-seven enforceable agreement milestones were schedule FYTD. Thirty-six (97 percent) of the thirty-seven were completed on or ahead of schedule and one (3 percent) is delinquent. The Department of Energy, Richland Operations Office entered into dispute resolution on April 7, 1995, for the delinquent milestone. Six (13 percent) of the 39 remaining enforceable agreement milestones scheduled for FY 1995 are forecast to be late. Additional information on these milestones can be found on pages 13 through 15. Performance data reflects a significant favorable $25.7 million (4 percent) cost variance. The majority of the cost variance is attributed to progress towards achievement of productivity commitment goals and is expected to continue for the remainder of this fiscal year

  18. Milestone achievement in emerging adulthood in spina bifida: a longitudinal investigation of parental expectations

    Science.gov (United States)

    Holbein, Christina E; Zebracki, Kathy; Bechtel, Colleen F; Papadakis, Jaclyn Lennon; Bruno, Elizabeth Franks; Holmbeck, Grayson N

    2016-01-01

    Aim To assess changes over time in parents' expectations of adult milestone achievement (college attendance, full-time job attainment, independent living, marriage, parenthood) for young people with spina bifida, to examine how expectancies relate to actual milestone achievement, and to compare milestone achievement in emerging adults with spina bifida with that of peers with typical development. Method Sixty-eight families of children with spina bifida (mean=8.34y, 37 male, 31 female) and 68 families of children with typical development (mean=8.49y, 37 male, 31 female) participated at Time 1. At all subsequent timepoints, parents of young people with spina bifida were asked to rate their expectations of emerging adulthood milestone achievement. At Time 7, when participants were 22 to 23 years old, milestone achievement was assessed. Results Parents of young people with spina bifida lowered their expectations over time for most milestones; parents of children with higher cognitive ability reported decreases of lower magnitude. Parent expectancies were optimistic and unrelated to actual milestone achievement. Emerging adults with spina bifida were less likely than individuals with typical development to achieve all milestones. Interpretation Optimistic parental expectations may be adaptive for children with spina bifida and their families, although it is important for families to set realistic goals. Healthcare providers serve a key role in helping families of young people with spina bifida prepare for emerging adulthood. PMID:27651215

  19. Playing with curricular milestones in the educational sandbox: Q-sort results from an internal medicine educational collaborative.

    Science.gov (United States)

    Meade, Lauren B; Caverzagie, Kelly J; Swing, Susan R; Jones, Ron R; O'Malley, Cheryl W; Yamazaki, Kenji; Zaas, Aimee K

    2013-08-01

    In competency-based medical education, the focus of assessment is on learner demonstration of predefined outcomes or competencies. One strategy being used in internal medicine (IM) is applying curricular milestones to assessment and reporting milestones to competence determination. The authors report a practical method for identifying sets of curricular milestones for assessment of a landmark, or a point where a resident can be entrusted with increased responsibility. Thirteen IM residency programs joined in an educational collaborative to apply curricular milestones to training. The authors developed a game using Q-sort methodology to identify high-priority milestones for the landmark "Ready for indirect supervision in essential ambulatory care" (EsAMB). During May to December 2010, the programs'ambulatory faculty participated in the Q-sort game to prioritize 22 milestones for EsAMB. The authors analyzed the data to identify the top 8 milestones. In total, 149 faculty units (1-4 faculty each) participated. There was strong agreement on the top eight milestones; six had more than 92% agreement across programs, and five had 75% agreement across all faculty units. During the Q-sort game, faculty engaged in dynamic discussion about milestones and expressed interest in applying the game to other milestones and educational settings. The Q-sort game enabled diverse programs to prioritize curricular milestones with interprogram and interparticipant consistency. A Q-sort exercise is an engaging and playful way to address milestones in medical education and may provide a practical first step toward using milestones in the real-world educational setting.

  20. Early motor developmental milestones and level of neuroticism in young adulthood

    DEFF Research Database (Denmark)

    Flensborg-Madsen, T; Sørensen, H J; Revsbech, Rasmus

    2013-01-01

    traits is almost non-existent. This study is therefore the first to investigate associations between early motor developmental milestones and neuroticism in adulthood. Method Mothers of 9125 children of the Copenhagen Perinatal Cohort recorded 12 developmental milestones during the child's first year...... of life. A subsample of the cohort comprising 1182 individuals participated in a follow-up when they were aged 20-34 years and were administered the Eysenck Personality Questionnaire (EPQ). Associations between motor developmental milestones and level of neuroticism, extraversion and psychoticism were...... analysed by multiple linear regression adjusting for for sex, single-mother status, parity, mother's age, father's age, parental social status and birth weight....

  1. 14 CFR 1274.908 - Milestone payments.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Milestone payments. 1274.908 Section 1274.908 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH...) Taxpayer identification number (TIN). (x) While not required, the recipient is strongly encouraged to...

  2. Milestones Toward Majorana-Based Quantum Computing

    Directory of Open Access Journals (Sweden)

    David Aasen

    2016-08-01

    Full Text Available We introduce a scheme for preparation, manipulation, and read out of Majorana zero modes in semiconducting wires with mesoscopic superconducting islands. Our approach synthesizes recent advances in materials growth with tools commonly used in quantum-dot experiments, including gate control of tunnel barriers and Coulomb effects, charge sensing, and charge pumping. We outline a sequence of milestones interpolating between zero-mode detection and quantum computing that includes (1 detection of fusion rules for non-Abelian anyons using either proximal charge sensors or pumped current, (2 validation of a prototype topological qubit, and (3 demonstration of non-Abelian statistics by braiding in a branched geometry. The first two milestones require only a single wire with two islands, and additionally enable sensitive measurements of the system’s excitation gap, quasiparticle poisoning rates, residual Majorana zero-mode splittings, and topological-qubit coherence times. These pre-braiding experiments can be adapted to other manipulation and read out schemes as well.

  3. CERN receives prestigious Milestone recognition from IEEE

    CERN Multimedia

    2005-01-01

    At a ceremony at CERN, Mr W. Cleon Anderson, President of the Institute of Electrical and Electronics Engineers (IEEE) formally a Milestone plaque in recognition of the invention of electronic particle detectors at CERN

  4. Milestones: a rapid assessment method for the Clinical Competency Committee

    OpenAIRE

    Nabors, Christopher; Forman, Leanne; Peterson, Stephen J.; Gennarelli, Melissa; Aronow, Wilbert S.; DeLorenzo, Lawrence; Chandy, Dipak; Ahn, Chul; Sule, Sachin; Stallings, Gary W.; Khera, Sahil; Palaniswamy, Chandrasekar; Frishman, William H.

    2016-01-01

    Introduction Educational milestones are now used to assess the developmental progress of all U.S. graduate medical residents during training. Twice annually, each program?s Clinical Competency Committee (CCC) makes these determinations and reports its findings to the Accreditation Council for Graduate Medical Education (ACGME). The ideal way to conduct the CCC is not known. After finding that deliberations reliant upon the new milestones were time intensive, our internal medicine residency pr...

  5. A pilot study of orthopaedic resident self-assessment using a milestones’ survey just prior to milestones implementation

    Science.gov (United States)

    Bradley, Kendall E.

    2016-01-01

    Objectives To pilot test if Orthopaedic Surgery residents could self-assess their performance using newly created milestones, as defined by the Accreditation Council on Graduate Medical Education.  Methods In June 2012, an email was sent to Program Directors and administrative coordinators of the154 accredited Orthopaedic Surgery Programs, asking them to send their residents a link to an online survey. The survey was adapted from the Orthopaedic Surgery Milestone Project. Completed surveys were aggregated in an anonymous, confidential database. SAS 9.3 was used to perform the analyses. Results Responses from 71 residents were analyzed. First and second year residents indicated through self-assessment that they had substantially achieved Level 1 and Level 2 milestones. Third year residents reported they had substantially achieved 30/41, and fourth year residents, all Level 3 milestones. Fifth year, graduating residents, reported they had substantially achieved 17 Level 4 milestones, and were extremely close on another 15. No milestone was rated at Level 5, the maximum possible.  Earlier in training, Patient Care and Medical Knowledge milestones were rated lower than the milestones reflecting the other four competencies of Practice Based Learning and Improvement, Systems Based Practice, Professionalism, and Interpersonal Communication. The gap was closed by the fourth year. Conclusions Residents were able to successfully self-assess using the 41 Orthopaedic Surgery milestones. Respondents’ rate improved proficiency over time. Graduating residents report they have substantially, or close to substantially, achieved all Level 4 milestonesMilestone self-assessment may be a useful tool as one component of a program’s overall performance assessment strategy. PMID:26752012

  6. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  7. Validity of Simulation-Based Assessment for Accreditation Council for Graduate Medical Education Milestone Achievement.

    Science.gov (United States)

    Isaak, Robert S; Chen, Fei; Martinelli, Susan M; Arora, Harendra; Zvara, David A; Hobbs, Gene; Stiegler, Marjorie P

    2018-01-25

    The Accreditation Council for Graduate Medical Education requires biannual evaluation of anesthesiology residents on 25 subcompetency milestones. Some milestone domains are particularly challenging to repeatedly and reliably observe during clinical care. Simulation-Based Milestones Assessment (SBMA) may help overcome these challenges. However, few studies have examined the external validation of simulation assessment scores (ie, the relationships between simulation-based assessment scores and other standard measures of ability) for milestones. This study analyzed whether SBMA scores (1) discriminate by postgraduate year, (2) improve over time, and (3) correlate with traditional measures of performance. This is a retrospective analysis of 55 residents' SBMA data from 30 scenarios for two academic years. Each scenario was evaluated for time-in-training discrimination. Scenarios were then analyzed for SBMA scoring trends over time, and SBMA scores were compared with residents' clinical evaluations. Twenty-four SBMA scenarios discriminated by postgraduate year. Repeated measure analysis of variance showed statistically significant between-session score improvements (F (3, 54) = 17.79, P Medical Education milestone competencies.

  8. The ordering of milestones in language development for children from 1 to 6 years of age

    NARCIS (Netherlands)

    Luinge, Margreet R; Post, Wendy J; Wit, Hero P; Goorhuis-Brouwer, Sieneke M

    2006-01-01

    PURPOSE: To scale language milestones in a group of 527 children to provide an instrument for screening language development. Procedure The questionnaire regarding these milestones was completed by parental report. It was evaluated whether the scaled milestones satisfied the assumptions of the

  9. The ordering of milestones in language development for children from 1 to 6 years of age

    NARCIS (Netherlands)

    Luinge, Margreet R.; Post, Wendy J.; Wit, Hero P.; Goorhuis - Brouwer, Siena

    2006-01-01

    Purpose: To scale language milestones in a group of 527 children to provide an instrument for screening language development. Procedure: The questionnaire regarding these milestones was completed by parental report. It was evaluated whether the scaled milestones satisfied the assumptions of the

  10. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  11. 324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05)

    International Nuclear Information System (INIS)

    Hobart, R.L.

    1998-01-01

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05, requires US Department of Energy, Richland Operations Office to complete a 324 Facility Special-Case Waste Assessment in Support of 324 Closure. This document, HNF-1270, has been prepared with the intent of meeting this regulatory commitment. Alternatives for the special-case wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel

  12. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  13. Windows of achievement for development milestones of Sri Lankan infants and toddlers: estimation through statistical modelling.

    Science.gov (United States)

    Thalagala, N

    2015-11-01

    The normative age ranges during which cohorts of children achieve milestones are called windows of achievement. The patterns of these windows of achievement are known to be both genetically and environmentally dependent. This study aimed to determine the windows of achievement for motor, social emotional, language and cognitive development milestones for infants and toddlers in Sri Lanka. A set of 293 milestones identified through a literature review were subjected to content validation using parent and expert reviews, which resulted in the selection of a revised set of 277 milestones. Thereafter, a sample of 1036 children from 2 months to 30 months was examined to see whether or not they had attained the selected milestones. Percentile ages of attaining milestone were determined using a rearranged closed form equation related to the logistic regression. The parameters required for calculations were derived through the logistic regression of milestone achievement statuses against ages of children. These percentile ages were used to define the respective windows of achievement. A set of 178 robust indicators that represent motor, socio emotional, language and cognitive development skills and their windows of achievement relevant to 2 to 24 months of age were determined. Windows of achievement for six gross motor milestones determined in the study were shown to closely overlap a similar set of windows of achievement published by the World Health Organization indicating the validity of some findings. A methodology combining the content validation based on qualitative techniques and age validation based on regression modelling found to be effective for determining age percentiles for realizing milestones and determining respective windows of achievement. © 2015 John Wiley & Sons Ltd.

  14. Outcome of intraoperative goal-directed therapy using Vigileo/FloTrac in high-risk patients scheduled for major abdominal surgeries: A prospective randomized trial

    Directory of Open Access Journals (Sweden)

    Mohammed A. Elgendy

    2017-07-01

    Conclusion: The applied protocol for intraoperative GDT provided significant reduction of PO morbidities, ICU and hospital LOS but couldn‘t significantly reduce mortality rates in high risk patients scheduled for major abdominal surgeries.

  15. Learnings From the Pilot Implementation of Mobile Medical Milestones Application.

    Science.gov (United States)

    Page, Cristen P; Reid, Alfred; Coe, Catherine L; Carlough, Martha; Rosenbaum, Daryl; Beste, Janalynn; Fagan, Blake; Steinbacher, Erika; Jones, Geoffrey; Newton, Warren P

    2016-10-01

    Implementation of the educational milestones benefits from mobile technology that facilitates ready assessments in the clinical environment. We developed a point-of-care resident evaluation tool, the Mobile Medical Milestones Application (M3App), and piloted it in 8 North Carolina family medicine residency programs. We sought to examine variations we found in the use of the tool across programs and explored the experiences of program directors, faculty, and residents to better understand the perceived benefits and challenges of implementing the new tool. Residents and faculty completed presurveys and postsurveys about the tool and the evaluation process in their program. Program directors were interviewed individually. Interviews and open-ended survey responses were analyzed and coded using the constant comparative method, and responses were tabulated under themes. Common perceptions included increased data collection, enhanced efficiency, and increased perceived quality of the information gathered with the M3App. Residents appreciated the timely, high-quality feedback they received. Faculty reported becoming more comfortable with the tool over time, and a more favorable evaluation of the tool was associated with higher utilization. Program directors reported improvements in faculty knowledge of the milestones and resident satisfaction with feedback. Faculty and residents credited the M3App with improving the quality and efficiency of resident feedback. Residents appreciated the frequency, proximity, and specificity of feedback, and faculty reported the app improved their familiarity with the milestones. Implementation challenges included lack of a physician champion and competing demands on faculty time.

  16. NORMA PERKEMBANGAN MOTOR MILESTONE ANAK SEHAT DAN BERGIZI BAIK DALAM RANGKA PENGEMBANGAN SUATU RUJUKAN

    Directory of Open Access Journals (Sweden)

    Abas B. Jahari

    2012-11-01

    Full Text Available Norm of Motor Milestone Achievements In Healthy and Well Nourished Children Leading To The Development A Reference.Background: The prevalence of malnutrition is still high in Indonesia, and one of its functional consequences is level of the intelectual capacity of children. Motor development is an essential of cognitive performance, and it is generally believed related with nutritional status of children, however very few studies had been carried out in the field condition.Objectlves: To describe the ceiling of motor milestone achievements of healthy and well nourished children aged 3-18 months in the development of norms for Indonesian children.Methods: The study was conducted in 4 big cities: Surabaya, Malang, Bandung and Bogor in 2100 healthy and well nourished children aged 3-18 months came from high SES (socio-economic status families who had no constraints on achieving normal growth and development. There were 17 milestones observed by well trainned enumerators following standard procedure. Analysis of percentiles 5, 10, 50, 90, and 95 for age against motor achievement were carried out for all children.Results: The difference in the attainment of the ceiling of motor milestones between males and females were not significant at any points of observation, therefore sex combined norm curve of motor development for children aged 3-18 months was ilustrated.Conclusions: The norm of motor milestone development for Indonesian children aged 3-18 months has been developed. Before being used as a reference, it needs to be evaluated or it is reliability and feasibility.Keywords: motor milestone, motor development, reference of motor development.

  17. 2016 CSSE L3 Milestone: Deliver In Situ to XTD End Users

    Energy Technology Data Exchange (ETDEWEB)

    Patchett, John M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Nouanesengsy, Boonthanome [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Fasel, Patricia Kroll [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ahrens, James Paul [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-13

    This report summarizes the activities in FY16 toward satisfying the CSSE 2016 L3 milestone to deliver in situ to XTD end users of EAP codes. The Milestone was accomplished with ongoing work to ensure the capability is maintained and developed. Two XTD end users used the in situ capability in Rage. A production ParaView capability was created in the HPC and Desktop environment. Two new capabilities were added to ParaView in support of an EAP in situ workflow. We also worked with various support groups at the lab to deploy a production ParaView in the LANL environment for both desktop and HPC systems. . In addition, for this milestone, we moved two VTK based filters from research objects into the production ParaView code to support a variety of standard visualization pipelines for our EAP codes.

  18. 324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)

    International Nuclear Information System (INIS)

    Hobart, R.L.

    1998-01-01

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel

  19. Tri-Lab Co-Design Milestone: In-Depth Performance Portability Analysis of Improved Integrated Codes on Advanced Architecture.

    Energy Technology Data Exchange (ETDEWEB)

    Hoekstra, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hammond, Simon David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Richards, David [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bergen, Ben [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-01

    This milestone is a tri-lab deliverable supporting ongoing Co-Design efforts impacting applications in the Integrated Codes (IC) program element Advanced Technology Development and Mitigation (ATDM) program element. In FY14, the trilabs looked at porting proxy application to technologies of interest for ATS procurements. In FY15, a milestone was completed evaluating proxy applications in multiple programming models and in FY16, a milestone was completed focusing on the migration of lessons learned back into production code development. This year, the co-design milestone focuses on extracting the knowledge gained and/or code revisions back into production applications.

  20. Age cohort differences in the developmental milestones of gay men.

    Science.gov (United States)

    Drasin, Harry; Beals, Kristin P; Elliott, Marc N; Lever, Janet; Klein, David J; Schuster, Mark A

    2008-01-01

    As the social context in which gay men live changes due to greater visibility, greater acceptance, and easier access to gay subculture, gay males may self-identify and take part in gay social activities at earlier ages than in the past. This study examined whether developmental milestones associated with sexual orientation for gay men have changed over the past several decades. A large and diverse sample of 2,402 gay men who responded to a 1994 survey published in a national magazine provided retrospective information on the age at which they reached individual psychological, social, and sexual behavior developmental milestones. We found evidence that individual psychological and sexual behavior milestones (e.g., awareness of attraction to males, having an orgasm with other male) are slowly moving toward earlier chronological ages (by 1 year of age every 8-25 years, p coming out) are moving more rapidly in a similar direction (by 1 year of age every 2-5 years, p < 0.001). The authors perform an innovative sensitivity test to demonstrate the persistence of the finding after correcting for the bias attributable to underrepresentation of those who have not yet self-identified as gay in such samples.

  1. Extracting the diffusion tensor from molecular dynamics simulation with Milestoning

    International Nuclear Information System (INIS)

    Mugnai, Mauro L.; Elber, Ron

    2015-01-01

    We propose an algorithm to extract the diffusion tensor from Molecular Dynamics simulations with Milestoning. A Kramers-Moyal expansion of a discrete master equation, which is the Markovian limit of the Milestoning theory, determines the diffusion tensor. To test the algorithm, we analyze overdamped Langevin trajectories and recover a multidimensional Fokker-Planck equation. The recovery process determines the flux through a mesh and estimates local kinetic parameters. Rate coefficients are converted to the derivatives of the potential of mean force and to coordinate dependent diffusion tensor. We illustrate the computation on simple models and on an atomically detailed system—the diffusion along the backbone torsions of a solvated alanine dipeptide

  2. Computation of transit times using the milestoning method with applications to polymer translocation

    Science.gov (United States)

    Hawk, Alexander T.; Konda, Sai Sriharsha M.; Makarov, Dmitrii E.

    2013-08-01

    Milestoning is an efficient approximation for computing long-time kinetics and thermodynamics of large molecular systems, which are inaccessible to brute-force molecular dynamics simulations. A common use of milestoning is to compute the mean first passage time (MFPT) for a conformational transition of interest. However, the MFPT is not always the experimentally observed timescale. In particular, the duration of the transition path, or the mean transit time, can be measured in single-molecule experiments, such as studies of polymers translocating through pores and fluorescence resonance energy transfer studies of protein folding. Here we show how to use milestoning to compute transit times and illustrate our approach by applying it to the translocation of a polymer through a narrow pore.

  3. Evolution and application of the competencies and educational milestones in physician graduate education in the United States

    Directory of Open Access Journals (Sweden)

    Ingrid Philibert

    2015-01-01

    The development of the milestones and initial testing by communities of practice in internal medicine, pediatrics, surgery, emergency medicine, neurological surgery and urology establishes the initial validity argument for the milestones. Further validity evidence will require study of the value of the milestones in assessment and accreditation, and linking educational outcomes to the performance and clinical outcomes of physicians in practice.

  4. Factors affecting mobility milestones and activities of daily living after stroke

    International Nuclear Information System (INIS)

    Takeuchi, Masahito

    2008-01-01

    Mobility milestones are elementary movements related to activities of daily living (ADL) and have a significant influence on functional recovery after stroke. This study aimed to identify the factors affecting mobility milestones and to clarify the relationships between mobility milestones and ADL. Participants were in the acute phase after first-ever strokes (ischemic, n=77; hemorrhagic, n=84). Clinical and radiological factors within the first week were determined and their effects on mobility milestones after 4 weeks were analyzed using logistic regression analysis. After 4 weeks the patients were divided into four groups on the basis of sitting balance, standing balance, and walking ability. Then total ADL score was calculated using the Barthel index (BI), and percentage of independent patients in each 10 items of BI was transition rate of ADL for each of the four groups. Patients with ischemic stroke showed the following findings. Sitting balance was affected by severity of lower limb paralysis, consciousness level, and presence of an internal capsule lesion on computed tomography (CT) (R 2 =0.86); standing balance was influenced by severity of lower limb paralysis and consciousness level (R 2 =0.72); and walking ability was affected by severity of lower limb paralysis (R 2 =0.64). Patients with hemorrhagic stroke showed the following findings. Sitting balance was influenced by severity of lower limb paralysis, intraventricular hemorrhage on CT, blood pressure instability, and fever (R 2 =0.75); standing balance was affected by severity of lower limb paralysis, consciousness level, and presence of an internal capsule lesion (R 2 =0.58); and walking ability was influenced by severity of lower limb paralysis and presence of an internal capsule lesion (R 2 =0.70). In both types of stroke, sitting and standing balance and walking ability were directly associated with total ADL score, and sitting and standing balance became independent earlier than ADL. Severity of

  5. 20 CFR 411.566 - May an EN use outcome or milestone payments to make payments to the beneficiary?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false May an EN use outcome or milestone payments... an EN use outcome or milestone payments to make payments to the beneficiary? Yes, an EN may use milestone or outcome payments to make payments to a beneficiary. [73 FR 29350, May 20, 2008] ...

  6. Nightshade Prototype Experiments (Silverleaf)

    Energy Technology Data Exchange (ETDEWEB)

    Danielson, Jeremy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bauer, Amy L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-23

    The Red Sage campaign is a series of subcritical dynamic plutonium experiments designed to measure ejecta. Nightshade, the first experiments in Red Sage scheduled for fiscal year 2019, will measure the amount of ejecta emission into vacuum from a double-­shocked plutonium surface. To address the major technical risks in Nightshade, a Level 2 milestone was developed for fiscal year 2016. Silverleaf, a series of four experiments, was executed at the Los Alamos National Laboratory in July and August 2016 to demonstrate a prototype of the Nightshade package and to satisfy this Level 2 milestone. This report is documentation that Red Sage Level 2 milestone requirements were successfully met.

  7. Competency champions in the clinical competency committee: a successful strategy to implement milestone evaluations and competency coaching.

    Science.gov (United States)

    Ketteler, Erika R; Auyang, Edward D; Beard, Kathy E; McBride, Erica L; McKee, Rohini; Russell, John C; Szoka, Nova L; Nelson, M Timothy

    2014-01-01

    To create a clinical competency committee (CCC) that (1) centers on the competency-based milestones, (2) is simple to implement, (3) creates competency expertise, and (4) guides remediation and coaching of residents who are not progressing in milestone performance evaluations. We created a CCC that meets monthly and at each meeting reviews a resident class for milestone performance, a competency (by a faculty competency champion), a resident rotation service, and any other resident or issue of concern. University surgical residency program. The CCC members include the program director, associate program directors, director of surgical curriculum, competency champions, departmental chair, 2 at-large faculty members, and the administrative chief residents. Seven residents were placed on remediation (later renamed as coaching) during the academic year after falling behind on milestone progression in one or more competencies. An additional 4 residents voluntarily placed themselves on remediation for medical knowledge after receiving in-training examination scores that the residents (not the CCC membership) considered substandard. All but 2 of the remediated/coached residents successfully completed all area milestone performance but some chose to stay on the medical knowledge competency strategy. Monthly meetings of the CCC make milestone evaluation less burdensome. In addition, the expectations of the residents are clearer and more tangible. "Competency champions" who are familiar with the milestones allow effective coaching strategies and documentation of clear performance improvements in competencies for successful completion of residency training. Residents who do not reach appropriate milestone performance can then be placed in remediation for more formal performance evaluation. The function of our CCC has also allowed us opportunity to evaluate the required rotations to ensure that they offer experiences that help residents achieve competency performance necessary

  8. Milestone Age Affects the Role of Health and Emotions in Life Satisfaction: A Preliminary Inquiry

    Science.gov (United States)

    Miron-Shatz, Talya; Bhargave, Rajesh; Doniger, Glen M.

    2015-01-01

    Jill turns 40. Should this change how she evaluates her life, and would a similar change occur when she turns 41? Milestone age (e.g., 30, 40, 50)—a naturally occurring feature in personal timelines—has received much attention is popular culture, but little attention in academic inquiry. This study examines whether milestone birthdays change the way people evaluate their life. We show that life outlook is impacted by this temporal landmark, which appears to punctuate people’s mental maps of their life cycle. At these milestone junctures, people take stock of where they stand and have a more evaluative perspective towards their lives when making life satisfaction judgments. Correspondingly, they place less emphasis on daily emotional experiences. We find that milestone agers (vs. other individuals) place greater weight on health satisfaction and BMI and lesser weight on daily positive emotions in their overall life satisfaction judgments, whereas negative emotions remain influential. PMID:26244348

  9. Some Important Milestones in the Field of Blood Clotting.

    Science.gov (United States)

    Doolittle, Russell F

    2016-01-01

    Several different kinds of 'milestone' in the field of blood coagulation are described from the middle decades of the 20th century. Although viewed from the standpoint of clotting per se, attention is also given to implications for innate immunity. The first milestone considered is the protracted saga of clotting dependence on vitamin K, an adventure that spanned more than five decades beginning in the 1920s. The second has to do with the discovery of a half-dozen 'new' clotting factors during the period immediately following World War II. A third pursues a narrower focus and examines the once mysterious transformation of fibrinogen into fibrin. Finally, the clinical treatment of classical hemophilia had a remarkable turning point in the 1960s as the result of simple but sensible measures. © 2015 S. Karger AG, Basel.

  10. LLNL radioactive waste management plan as per DOE Order 5820.2

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of LLNL's radioactive waste management plan are discussed: program administration; description of waste generating processes; radioactive waste collection, treatment, and disposal; sanitary waste management; site 300 operations; schedules and major milestones for waste management activities; and environmental monitoring programs (sampling and analysis)

  11. Use of Key Performance Indicators to Improve Milestone Assessment in Semi-Annual Clinical Competency Committee Meetings.

    Science.gov (United States)

    Chen, Fei; Arora, Harendra; Martinelli, Susan M

    2017-01-01

    The Accreditation Council for Graduate Medical Education's Next Accreditation System requires residency programs to semiannually submit composite milestone data on each resident's performance. This report describes and evaluates a new assessment review procedure piloted in our departmental Clinical Competency Committee (CCC) semi-annual meeting in June 2016. A modified Delphi technique was utilized to develop key performance indicators (KPI) linking milestone descriptors to clinical practice. In addition, the CCC identified six specific milestone sub-competencies that would be prescored with objective data prior to the meeting. Each resident was independently placed on the milestones by 3 different CCC faculty members. Milestone placement data of the same cohort of 42 residents (Clinical Anesthesia Years 1-3) were collected to calculate inter-rater reliability of the assessment procedures before and after the implemented changes. A survey was administrated to collect CCC feedback on the new procedure. The procedure assisted in reducing meeting time from 8 to 3.5 hours. Survey of the CCC members revealed positive perception of the procedure. Higher inter-rater reliability of the milestone placement was obtained using the implemented KPIs (Intraclass correlation coefficient [ICC] single measure range: before=.53-.94, after=.74-.98). We found the new assessment procedure beneficial to the efficiency and transparency of the assessment process. Further improvement of the procedure involves refinement of KPIs and additional faculty development on KPIs to allow non-CCC faculty to provide more accurate resident evaluations.

  12. Toddlers’ Fine Motor Milestone Achievement is Associated with Early Touchscreen Scrolling

    Directory of Open Access Journals (Sweden)

    Rachael Bedford

    2016-08-01

    Full Text Available Touchscreen technologies provide an intuitive and attractive source of sensory/cognitive stimulation for young children. Despite fears that usage may have a negative impact on toddlers’ cognitive development, empirical evidence is lacking. The current study presents results from the UK Toddler Attentional Behaviours and LEarning with Touchscreens (TABLET project, examining the association between toddlers’ touchscreen use and the attainment of developmental milestones. Data were gathered in an online survey of 715 parents of 6- to 36-month-olds to address two research questions: 1 How does touchscreen use change from 6 to 36 months? 2 In toddlers (19 to 36 months i.e., above the median age, n = 366, how does retrospectively reported age of first touchscreen usage relate to gross motor (i.e., walking, fine motor (i.e., stacking blocks and language (i.e., producing two-word utterances milestones? In our sample, the proportion of children using touchscreens, as well as the average daily usage time, increased with age (youngest quartile, 6-11 months: 51.22% users, 8.53 minutes per day; oldest quartile, 26-36 months: 92.05% users, average use of 43.95 minutes per day. In toddlers, aged 19-36 months, age of first touchscreen use was significantly associated with fine motor (stacking blocks, p = 0.03, after controlling for covariates age, sex, mother’s education (a proxy for SES as well as age of early fine motor milestone achievement (pincer grip. This effect was only present for active scrolling of the touchscreen p = 0.04, not for video watching. No significant relationships were found between touchscreen use and either gross motor or language milestones. Touchscreen use increases rapidly over the first three years of life. In the current study, we find no evidence to support a negative association between the age of first touchscreen usage and developmental milestones. Indeed, earlier touchscreen use, specifically scrolling of the screen, was

  13. Milestone-compatible neurology resident assessments: A role for observable practice activities.

    Science.gov (United States)

    Jones, Lyell K; Dimberg, Elliot L; Boes, Christopher J; Eggers, Scott D Z; Dodick, David W; Cutsforth-Gregory, Jeremy K; Leep Hunderfund, Andrea N; Capobianco, David J

    2015-06-02

    Beginning in 2014, US neurology residency programs were required to report each trainee's educational progression within 29 neurology Milestone competency domains. Trainee assessment systems will need to be adapted to inform these requirements. The primary aims of this study were to validate neurology resident assessment content using observable practice activities (OPAs) and to develop assessment formats easily translated to the Neurology Milestones. A modified Delphi technique was used to establish consensus perceptions of importance of 73 neurology OPAs among neurology educators and trainees at 3 neurology residency programs. A content validity score (CVS) was derived for each neurology OPA, with scores ≥4.0 determined in advance to indicate sufficient content validity. The mean CVS for all OPAs was 4.4 (range 3.5-5.0). Fifty-seven (78%) OPAs had a CVS ≥4.0, leaving 16 (22%) below the pre-established threshold for content validity. Trainees assigned a higher importance to individual OPAs (mean CVS 4.6) compared to faculty (mean 4.4, p = 0.016), but the effect size was small (η(2) = 0.10). There was no demonstrated effect of length of education experience on perceived importance of neurology OPAs (p = 0.23). Two sample resident assessment formats were developed, one using neurology OPAs alone and another using a combination of neurology OPAs and the Neurology Milestones. This study provides neurology training programs with content validity evidence for items to include in resident assessments, and sample assessment formats that directly translate to the Neurology Milestones. Length of education experience has little effect on perceptions of neurology OPA importance. © 2015 American Academy of Neurology.

  14. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  15. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  16. Gauging knowledge of developmental milestones among Albertan adults: a cross-sectional survey

    Directory of Open Access Journals (Sweden)

    Tough Suzanne

    2010-04-01

    Full Text Available Abstract Background Parental knowledge of child development has been associated with more effective parenting strategies and better child outcomes. However, little is known about what adults who interact with children under the age of 14 years know about child development. Methods Between September 2007 and March 2008, computer assisted telephone interviews were completed with 1443 randomly selected adults. Adults were eligible if they had interacted with a child less than 14 years of age in the past six months and lived in Alberta, Canada. Results Sixty three percent of respondents answered two (or more out of four questions on physical development correctly. Fifteen percent of respondents answered two (or more out of three questions on cognitive development correctly. Seven percent of respondents answered three (or more out of five questions on social development correctly. Two percent of respondents answered three (or more out of five questions on emotional development correctly. Parents and females were better able to identify physical developmental milestones compared to non-parents and males. 81% of adults correctly responded that a child's experience in the first year of life has an important impact on later school performance, 70% correctly responded that a child's ability to learn is not set from birth, 50% of adults correctly responded that children learn more from hearing someone speak than from television, and 45% recognized that parents' emotional closeness with a baby influences later achievement. Parents were most likely to use doctors/paediatricians, books, and nurses as resources. Among parents, there was no relationship between knowledge and parenting morale. Conclusions The majority of adults were unable to correctly answer questions related to when children under six years of age typically achieve developmental milestones. Knowledge of physical development exceeded knowledge about cognitive, emotional and social development

  17. Normal motor milestone development for use to promote child care

    Directory of Open Access Journals (Sweden)

    Mahdin A. Husaini

    2016-10-01

    Full Text Available Background Motor behavior is an essential aspect of child development, and usually assessed in terms of age of achievement of motor milestone. The early detection of infants experiencing subtle delays in motor maturation can allow early intervention in developmental problems. Intervention can be more effective if delays are identified early. In order to facilitate the identification of early delays, the Center of Nutrition and Foods Research and Development in Bogor has designed a simple tool to monitor the child (aged 3 to 18 months motor development. Objective To develop an observable of normal gross motor maturation for use to detect deviance or motor delay. Methods A total of 2100 healthy children, aged 3-18 months, from high socio-economic group, in urban and suburban areas, were studied. Body length, weight and motor development were measured on all children. Gross motor development was measured 17 pre selected milestones: lie, sit, crawl, creep, stand Mth assistance, walk with assistance, stand alone, walk alone, and run. Results There were no differences between males and females in the comparison of attainment motor maturation therefore a sex combined curve was developed. Conclusion The curve of normal motor milestone development can be used as a tool to evaluate motor development over time, and/or as a child development card for use in primary health care.

  18. Milestone M4900: Simulant Mixing Analytical Results

    Energy Technology Data Exchange (ETDEWEB)

    Kaplan, D.I.

    2001-07-26

    This report addresses Milestone M4900, ''Simulant Mixing Sample Analysis Results,'' and contains the data generated during the ''Mixing of Process Heels, Process Solutions, and Recycle Streams: Small-Scale Simulant'' task. The Task Technical and Quality Assurance Plan for this task is BNF-003-98-0079A. A report with a narrative description and discussion of the data will be issued separately.

  19. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  20. Alternative Work Schedules in Office and Nonoffice Work Settings.

    Science.gov (United States)

    Kirk, Raymond J.; Barton, H. David

    A rapidly growing change in the workplace is the replacement of a fixed work schedule with a variety of alternative work schedules (AWS), including both flexible and compressed schedules. Experimenting organizations (N=901) evaluated one of four major categories of AWS in office and nonoffice settings, i.e., a flexible 8-hour day;…

  1. Code Verification Capabilities and Assessments in Support of ASC V&V Level 2 Milestone #6035

    Energy Technology Data Exchange (ETDEWEB)

    Doebling, Scott William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Budzien, Joanne Louise [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ferguson, Jim Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Harwell, Megan Louise [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hickmann, Kyle Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Israel, Daniel M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Magrogan, William Richard III [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Singleton, Jr., Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Srinivasan, Gowri [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Walter, Jr, John William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woods, Charles Nathan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-26

    This document provides a summary of the code verification activities supporting the FY17 Level 2 V&V milestone entitled “Deliver a Capability for V&V Assessments of Code Implementations of Physics Models and Numerical Algorithms in Support of Future Predictive Capability Framework Pegposts.” The physics validation activities supporting this milestone are documented separately. The objectives of this portion of the milestone are: 1) Develop software tools to support code verification analysis; 2) Document standard definitions of code verification test problems; and 3) Perform code verification assessments (focusing on error behavior of algorithms). This report and a set of additional standalone documents serve as the compilation of results demonstrating accomplishment of these objectives.

  2. The noise-induced hearing loss milestones: past and future

    CSIR Research Space (South Africa)

    Edwards, AL

    2012-10-01

    Full Text Available sought to answer the questions: Did we reach the 2008 milestone? What should the industry do now about hearing conservation that will ensure that there is no deterioration in hearing greater than 10% amongst noise-exposed miners? How can we ensure...

  3. 20 CFR 411.545 - How are the outcome payments calculated under the outcome-milestone payment system?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false How are the outcome payments calculated under the outcome-milestone payment system? 411.545 Section 411.545 Employees' Benefits SOCIAL SECURITY... are the outcome payments calculated under the outcome-milestone payment system? The amount of each...

  4. 20 CFR 411.560 - Is it possible to pay a milestone or outcome payment to more than one EN?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Is it possible to pay a milestone or outcome... possible to pay a milestone or outcome payment to more than one EN? It is possible for more than one EN (including a State VR agency acting as an EN) to receive payment based on the same milestone or outcome. If...

  5. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  6. Supercollider design submitted

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The research and development programme for the proposed US Superconducting Super Collider (SSC) passed a major milestone on schedule with the submission of a conceptual design report to the US Department of Energy (DOE) on 31 March. Since then, the design has been favourably reviewed by DOE officials

  7. Scoliosis in children with osteogenesis imperfecta: influence of severity of disease and age of reaching motor milestones

    NARCIS (Netherlands)

    Engelbert, Raoul H. H.; Uiterwaal, Cuno S. P. M.; van der Hulst, Annelies; Witjes, Baukje; Helders, Paul J. M.; Pruijs, Hans E. H.

    2003-01-01

    We studied the relationship between the age of reaching motor milestones, especially anti-gravity activities, and the age of development of pathological spinal curvatures in children with osteogenesis imperfecta (OI). We hypothesized that earlier achievement of anti-gravity motor milestones predicts

  8. Providing lipid-based nutrient supplements does not affect developmental milestones among Malawian children.

    Science.gov (United States)

    Mangani, Charles; Cheung, Yin Bun; Maleta, Kenneth; Phuka, John; Thakwalakwa, Chrissie; Dewey, Kathryn; Manary, Mark; Puumalainen, Taneli; Ashorn, Per

    2014-01-01

    To assess whether using lipid-based nutrient supplements (LNS) to complement the diets of infants and young children affected when they achieved selected developmental milestones. In rural Malawi, 840 6-month-old healthy infants were enrolled to a randomised trial. Control participants received no supplements, others were provided with milk-containing LNS, soy-containing LNS or corn-soy blend (CSB) for 12 months. Outcomes were the age at which they achieved key milestone: motor (walking with assistance, standing and walking alone, running), social (drinking from a cup and eating by themselves) and language (saying single comprehensible words and waving goodbye). The mean age at which the subjects walked with assistance was 42.5, 42.3, 42.7 and 43.2 weeks in the control, milk-LNS, soy-LNS and CSB groups, respectively (p = 0.748). There were also no significant differences in the mean age at standing alone (45.0, 44.9, 45.1 and 46.3 weeks), walking alone (54.6, 55.1, 55.3, 56.5 weeks), running (64.6, 63.7, 64.8, 65.9 weeks) or any other social or language milestones (each p > 0.10). The findings do not support a hypothesis that providing tested formulations and doses of micronutrient-fortified LNS or CSB would have an impact on when young children in rural Malawi achieved selected developmental milestones. ©2013 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  9. Visualization on supercomputing platform level II ASC milestone (3537-1B) results from Sandia.

    Energy Technology Data Exchange (ETDEWEB)

    Geveci, Berk (Kitware, Inc., Clifton Park, NY); Fabian, Nathan; Marion, Patrick (Kitware, Inc., Clifton Park, NY); Moreland, Kenneth D.

    2010-09-01

    This report provides documentation for the completion of the Sandia portion of the ASC Level II Visualization on the platform milestone. This ASC Level II milestone is a joint milestone between Sandia National Laboratories and Los Alamos National Laboratories. This milestone contains functionality required for performing visualization directly on a supercomputing platform, which is necessary for peta-scale visualization. Sandia's contribution concerns in-situ visualization, running a visualization in tandem with a solver. Visualization and analysis of petascale data is limited by several factors which must be addressed as ACES delivers the Cielo platform. Two primary difficulties are: (1) Performance of interactive rendering, which is most computationally intensive portion of the visualization process. For terascale platforms, commodity clusters with graphics processors(GPUs) have been used for interactive rendering. For petascale platforms, visualization and rendering may be able to run efficiently on the supercomputer platform itself. (2) I/O bandwidth, which limits how much information can be written to disk. If we simply analyze the sparse information that is saved to disk we miss the opportunity to analyze the rich information produced every timestep by the simulation. For the first issue, we are pursuing in-situ analysis, in which simulations are coupled directly with analysis libraries at runtime. This milestone will evaluate the visualization and rendering performance of current and next generation supercomputers in contrast to GPU-based visualization clusters, and evaluate the performance of common analysis libraries coupled with the simulation that analyze and write data to disk during a running simulation. This milestone will explore, evaluate and advance the maturity level of these technologies and their applicability to problems of interest to the ASC program. Scientific simulation on parallel supercomputers is traditionally performed in four

  10. Milestones in software engineering and knowledge engineering history: a comparative review.

    Science.gov (United States)

    del Águila, Isabel M; Palma, José; Túnez, Samuel

    2014-01-01

    We present a review of the historical evolution of software engineering, intertwining it with the history of knowledge engineering because "those who cannot remember the past are condemned to repeat it." This retrospective represents a further step forward to understanding the current state of both types of engineerings; history has also positive experiences; some of them we would like to remember and to repeat. Two types of engineerings had parallel and divergent evolutions but following a similar pattern. We also define a set of milestones that represent a convergence or divergence of the software development methodologies. These milestones do not appear at the same time in software engineering and knowledge engineering, so lessons learned in one discipline can help in the evolution of the other one.

  11. Early motor developmental milestones and level of neuroticism in young adulthood

    DEFF Research Database (Denmark)

    Flensborg-Madsen, Trine; Sørensen, Holger Jelling; Revsbech, Rasmus

    2012-01-01

    intelligence. CONCLUSIONS: The findings are the first of their kind and suggest that delays in early motor development may not only characterize psychopathological disorders such as schizophrenia, but may also be associated with the personality dimension of neuroticism in adulthood.......BACKGROUND: Studies investigating early developmental factors in relation to psychopathology have mainly focused on schizophrenia. The personality dimension of neuroticism seems to be a general risk factor for psychopathology, but evidence on associations between early developmental precursors...... and personality traits is almost non-existent. This study is therefore the first to investigate associations between early motor developmental milestones and neuroticism in adulthood. Method Mothers of 9125 children of the Copenhagen Perinatal Cohort recorded 12 developmental milestones during the child's first...

  12. Apparatus as Milestones in the History of Comparative Psychology

    Science.gov (United States)

    Washburn, David A.; Rumbaugh, Duane M.; Putney, R. Thompson

    1994-01-01

    Significant apparatus developments from the history of comparative psychology are reviewed, including the contemporary trend toward computer use in research with nonhuman animals. It is argued that milestone apparatus served not only to open new lines of inquiry but also to shape or delimit the nature of the answers that were obtained.

  13. E-learning for Newcomers on the IAEA Milestones Approach

    International Nuclear Information System (INIS)

    Halt, Lotta

    2014-01-01

    Background to E-learning modules: • Member States requesting assistance in introducing nuclear power programs; • Implement training for a broad audience at an overview level; • Foundation to better understand the IAEA Milestones approach; • MS may have problems providing satisfactory (nuclear) Education and Training; • Funded by Republic of Korea

  14. Modeling kinetics and equilibrium of membranes with fields: Milestoning analysis and implication to permeation

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Alfredo E. [Institute for Computational Engineering and Sciences, University of Texas at Austin, Austin, Texas 78712 (United States); Elber, Ron [Institute for Computational Engineering and Sciences, University of Texas at Austin, Austin, Texas 78712 (United States); Department of Chemistry, University of Texas at Austin, Austin, Texas 78712 (United States)

    2014-08-07

    Coarse graining of membrane simulations by translating atomistic dynamics to densities and fields with Milestoning is discussed. The space of the membrane system is divided into cells and the different cells are characterized by order parameters presenting the number densities. The dynamics of the order parameters are probed with Milestoning. The methodology is illustrated here for a phospholipid membrane system (a hydrated bilayer of DOPC (1,2-dioleoyl-sn-glycero-3-phosphocholine) lipid molecules). Significant inhomogeneity in membrane internal number density leads to complex free energy landscape and local maps of transition times. Dynamics and distributions of cavities within the membrane assist the permeation of nonpolar solutes such as xenon atoms. It is illustrated that quantitative and detailed dynamics of water transport through DOPC membrane can be analyzed using Milestoning with fields. The reaction space for water transport includes at least two slow variables: the normal to the membrane plane, and the water density.

  15. Modeling kinetics and equilibrium of membranes with fields: Milestoning analysis and implication to permeation

    International Nuclear Information System (INIS)

    Cardenas, Alfredo E.; Elber, Ron

    2014-01-01

    Coarse graining of membrane simulations by translating atomistic dynamics to densities and fields with Milestoning is discussed. The space of the membrane system is divided into cells and the different cells are characterized by order parameters presenting the number densities. The dynamics of the order parameters are probed with Milestoning. The methodology is illustrated here for a phospholipid membrane system (a hydrated bilayer of DOPC (1,2-dioleoyl-sn-glycero-3-phosphocholine) lipid molecules). Significant inhomogeneity in membrane internal number density leads to complex free energy landscape and local maps of transition times. Dynamics and distributions of cavities within the membrane assist the permeation of nonpolar solutes such as xenon atoms. It is illustrated that quantitative and detailed dynamics of water transport through DOPC membrane can be analyzed using Milestoning with fields. The reaction space for water transport includes at least two slow variables: the normal to the membrane plane, and the water density

  16. Milestones in Software Engineering and Knowledge Engineering History: A Comparative Review

    Science.gov (United States)

    del Águila, Isabel M.; Palma, José; Túnez, Samuel

    2014-01-01

    We present a review of the historical evolution of software engineering, intertwining it with the history of knowledge engineering because “those who cannot remember the past are condemned to repeat it.” This retrospective represents a further step forward to understanding the current state of both types of engineerings; history has also positive experiences; some of them we would like to remember and to repeat. Two types of engineerings had parallel and divergent evolutions but following a similar pattern. We also define a set of milestones that represent a convergence or divergence of the software development methodologies. These milestones do not appear at the same time in software engineering and knowledge engineering, so lessons learned in one discipline can help in the evolution of the other one. PMID:24624046

  17. Milestones in 150 years of the chemical industry

    International Nuclear Information System (INIS)

    Morris, P.J.T.; Campbell, W.A.; Roberts, H.L.

    1991-01-01

    Milestones in 150 years of the Chemical Industry charts the history of the industry in its crucial role of meetings basic human needs. The book provides on overview of developments in the industry in the fields of health, clothing, energy, materials and information technology and sets the information in an historical context. It will be of interest to chemists in industry, academic, business and to the lay public. (author)

  18. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  19. Adaptive Priority-Based Downlink Scheduling for WiMAX Networks

    OpenAIRE

    Wu, Shih-Jung; Huang, Shih-Yi; Huang, Kuo-Feng

    2012-01-01

    Supporting quality of service (QoS) guarantees for diverse multimedia services are the primary concerns for WiMAX (IEEE 802.16) networks. A scheduling scheme that satisfies QoS requirements has become more important for wireless communications. We propose a downlink scheduling scheme called adaptive priority-based downlink scheduling (APDS) for providing QoS guarantees in IEEE 802.16 networks. APDS comprises two major components: priority assignment and resource allocation. Different service-...

  20. 20 CFR 411.536 - Under what circumstances can we make a reconciliation payment under the outcome-milestone payment...

    Science.gov (United States)

    2010-04-01

    ... reconciliation payment under the outcome-milestone payment system? 411.536 Section 411.536 Employees' Benefits... Systems § 411.536 Under what circumstances can we make a reconciliation payment under the outcome-milestone payment system? When the beneficiary's outcome payment period begins before the beneficiary has...

  1. A milestone in safety

    CERN Multimedia

    2010-01-01

    Over recent days, we’ve achieved some historic milestones in LHC physics as we’ve made the transition from proton to ion running. These have been widely reported and I’ve communicated the news to you by e-mail. Less visible, but nonetheless vital to the functioning of the Lab, is an agreement that we’ll be signing with our Host States on 15 November. It will be the second tripartite agreement to be signed in as many months, and it is set to streamline our radiation protection and radiation safety.   The new agreement replaces existing bilateral agreements governing the procedures applying on the French and Swiss parts of the site. From an operational point of view, the new agreement simplifies matters by harmonising administrative processes while guaranteeing best practice in terms of radiation protection and radiation safety at CERN. The agreement is the result of many months of detailed discussions with the Autorité de Sûret&eac...

  2. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  3. Using a vision cognitive algorithm to schedule virtual machines

    OpenAIRE

    Zhao Jiaqi; Mhedheb Yousri; Tao Jie; Jrad Foued; Liu Qinghuai; Streit Achim

    2014-01-01

    Scheduling virtual machines is a major research topic for cloud computing, because it directly influences the performance, the operation cost and the quality of services. A large cloud center is normally equipped with several hundred thousand physical machines. The mission of the scheduler is to select the best one to host a virtual machine. This is an NPhard global optimization problem with grand challenges for researchers. This work studies the Virtual Machine (VM) scheduling problem on the...

  4. Fine motor and self-care milestones for individuals with Down syndrome using a Retrospective Chart Review.

    Science.gov (United States)

    Frank, K; Esbensen, A J

    2015-08-01

    Developmental milestone markers for fine motor and self-care skills among children with Down syndrome (DS) are either minimal, anecdotal or out-of date. Our goal was to produce normative expectations for the development of fine motor and self-care milestones specific to children with DS. A cross-sectional retrospective chart review was completed on 274 children with DS seen at a specialty clinic that ranged in age from 4 months to 18 years. Specific skills were assessed at occupational therapy assessments as either present or absent, including fine motor, handwriting, scissor usage, self-feeding and clothing management. Fine motor milestones describing when 10-30% ('early achievers') and 75-95% ('representative achievement') of children with DS had mastered each skill were developed based upon descriptive review. As the fine motor and self-care skills advanced in complexity, the range of ages for documented skill acquisition was observed to increase. Age ranges for the mastery of fine motor developmental milestones for early and representative achievement were developed based upon descriptive analysis of cross-sectional retrospective clinical chart reviews. That the age range for mastering fine motor and self-care skills broadens as children with DS get older is in agreement with what is identified in the DS behavioural phenotype with regard to variable motor skills overall. These fine motor and self-care developmental milestone markers contribute to the field by informing parents, caregivers and healthcare providers of potential fine motor and self-care outcomes and describing normative development for children with DS. © 2014 MENCAP and International Association of the Scientific Study of Intellectual and Developmental Disabilities and John Wiley & Sons Ltd.

  5. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  6. The Pediatrics Milestones Assessment Pilot: Development of Workplace-Based Assessment Content, Instruments, and Processes.

    Science.gov (United States)

    Hicks, Patricia J; Margolis, Melissa; Poynter, Sue E; Chaffinch, Christa; Tenney-Soeiro, Rebecca; Turner, Teri L; Waggoner-Fountain, Linda; Lockridge, Robin; Clyman, Stephen G; Schwartz, Alan

    2016-05-01

    To report on the development of content and user feedback regarding the assessment process and utility of the workplace-based assessment instruments of the Pediatrics Milestones Assessment Pilot (PMAP). One multisource feedback instrument and two structured clinical observation instruments were developed and refined by experts in pediatrics and assessment to provide evidence for nine competencies based on the Pediatrics Milestones (PMs) and chosen to inform residency program faculty decisions about learners' readiness to serve as pediatric interns in the inpatient setting. During the 2012-2013 PMAP study, 18 U.S. pediatric residency programs enrolled interns and subinterns. Faculty, residents, nurses, and other observers used the instruments to assess learner performance through direct observation during a one-month rotation. At the end of the rotation, data were aggregated for each learner, milestone levels were assigned using a milestone classification form, and feedback was provided to learners. Learners and site leads were surveyed and/or interviewed about their experience as participants. Across the sites, 2,338 instruments assessing 239 learners were completed by 630 unique observers. Regarding end-of-rotation feedback, 93% of learners (128/137) agreed the assessments and feedback "helped me understand how those with whom I work perceive my performance," and 85% (117/137) agreed they were "useful for constructing future goals or identifying a developmental path." Site leads identified several benefits and challenges to the assessment process. PM-based instruments used in workplace-based assessment provide a meaningful and acceptable approach to collecting evidence of learner competency development. Learners valued feedback provided by PM-based assessment.

  7. Brief Report: Ages of Language Milestones as Predictors of Developmental Trajectories in Young Children with Autism Spectrum Disorder

    Science.gov (United States)

    Kover, Sara T.; Edmunds, Sarah R.; Ellis Weismer, Susan

    2016-01-01

    Recognizing early risk markers in young children with autism spectrum disorder (ASD) is critical for timely diagnosis and intervention. The purpose of this study was to extend previous findings regarding language milestones to a longitudinal design, in which ages of expressive language milestones (i.e., first words, first phrases) could serve as…

  8. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  9. Microcomputer-based workforce scheduling for hospital porters.

    Science.gov (United States)

    Lin, C K

    1999-01-01

    This paper focuses on labour scheduling for hospital porters who are the major workforce providing routine cleansing of wards, transportation and messenger services. Generating an equitable monthly roster for porters while meeting the daily minimum demand is a tedious task scheduled manually by a supervisor. In considering a variety of constraints and goals, a manual schedule was usually produced in seven to ten days. To be in line with the strategic goal of scientific management of an acute care regional hospital in Hong Kong, a microcomputer-based algorithm was developed to schedule the monthly roster. The algorithm, coded in Digital Visual Fortran 5.0 Professional, could generate a monthly roster in seconds. Implementation has been carried out since September 1998 and the results proved to be useful to hospital administrators and porters. This paper discusses both the technical and human issues involved during the computerization process.

  10. TRT Barrel milestones passed

    CERN Multimedia

    Ogren, H

    2004-01-01

    The barrel TRT detector passed three significant milestones this spring. The Barrel Support Structure (BSS) was completed and moved to the SR-1 building on February 24th. On March 12th the first module passed the quality assurance testing in Building 154 and was transported to the assembly site in the SR-1 building for barrel assembly. Then on April 21st the final production module that had been scanned at Hampton University was shipped to CERN. TRT Barrel Module Production The production of the full complement of barrel modules (96 plus 9 total spares) is now complete. This has been a five-year effort by Duke University, Hampton University, and Indiana University. Actual construction of the modules in the United States was completed in the first part of 2004. The production crews at each of the sites in the United States have now completed their missions. They are shown in the following pictures. Duke University: Production crew with the final completed module. Indiana University: Module producti...

  11. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  12. Milestone and cost management financial reports for period ending September 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report is a monthly summary for September 1995 for work performed by IIT Research Institute under DOE contract number DE-AC05-93OR22160. Financial data and milestones for September 1995 are included in the report

  13. Relations of Alcohol Consumption with Smoking Cessation Milestones and Tobacco Dependence

    Science.gov (United States)

    Cook, Jessica W.; Fucito, Lisa M.; Piasecki, Thomas M.; Piper, Megan E.; Schlam, Tanya R.; Berg, Kristin M.; Baker, Timothy B.

    2012-01-01

    Objective: Alcohol consumption is associated with smoking cessation failure in both community and clinical research. However, little is known about the relation between alcohol consumption and smoking cessation milestones (i.e., achieving initial abstinence, avoiding lapses and relapse). Our objective in this research was to examine the relations…

  14. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  15. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  16. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    Science.gov (United States)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  17. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  18. A case study: the initiative to improve RN scheduling at Hamilton Health Sciences.

    Science.gov (United States)

    Wallace, Laurel-Anne; Pierson, Sharon

    2008-01-01

    In 2003, Hamilton Health Sciences embarked on an initiative to improve and standardize nursing schedules and scheduling practices. The scheduling project was one of several initiatives undertaken by a corporate-wide Nursing Resource Group established to enhance the work environment and patient care and to ensure appropriate utilization of nursing resources across the organization's five hospitals. This article focuses on major activities undertaken in the scheduling initiative. The step-by-step approach described, plus examples of the scheduling resources developed and samples of extended-tour schedules, will all provide insight, potential strategies and practical help for nursing administrators, human resources (HR) personnel and others interested in improving nurse scheduling.

  19. The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

    Energy Technology Data Exchange (ETDEWEB)

    Lavender, John C. [CH2M HILL Plateau Remediation Company, Richland, WA 99354 (United States); Edwards, W. Scott [Areva Federal Services, Richland, WA 99354 (United States); Macbeth, Paul J.; Self, Richard J. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); West, Lori D. [Materials and Energy Corporation, Richland, WA 99354 (United States)

    2012-07-01

    The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

  20. Major Biomass Conference

    Science.gov (United States)

    Top Scientists, Industry and Government Leaders to Gather for Major Biomass Conference America, South America and Europe will focus on building a sustainable, profitable biomass business at the Third Biomass Conference of the Americas in Montreal. Scheduled presentations will cover all biomass

  1. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  2. Putting the pediatrics milestones into practice: a consensus roadmap and resource analysis.

    Science.gov (United States)

    Schumacher, Daniel J; Spector, Nancy D; Calaman, Sharon; West, Daniel C; Cruz, Mario; Frohna, John G; Gonzalez Del Rey, Javier; Gustafson, Kristina K; Poynter, Sue Ellen; Rosenbluth, Glenn; Southgate, W Michael; Vinci, Robert J; Sectish, Theodore C

    2014-05-01

    The Accreditation Council for Graduate Medical Education has partnered with member boards of the American Board of Medical Specialties to initiate the next steps in advancing competency-based assessment in residency programs. This initiative, known as the Milestone Project, is a paradigm shift from traditional assessment efforts and requires all pediatrics residency programs to report individual resident progression along a series of 4 to 5 developmental levels of performance, or milestones, for individual competencies every 6 months beginning in June 2014. The effort required to successfully make this shift is tremendous given the number of training programs, training institutions, and trainees. However, it holds great promise for achieving training outcomes that align with patient needs; developing a valid, reliable, and meaningful way to track residents' development; and providing trainees with a roadmap for learning. Recognizing the resources needed to implement this new system, the authors, all residency program leaders, provide their consensus view of the components necessary for implementing and sustaining this effort, including resource estimates for completing this work. The authors have identified 4 domains: (1) Program Review and Development of Stakeholders and Participants, (2) Assessment Methods and Validation, (3) Data and Assessment System Development, and (4) Summative Assessment and Feedback. This work can serve as a starting point and framework for collaboration with program, department, and institutional leaders to identify and garner necessary resources and plan for local and national efforts that will ensure successful transition to milestones-based assessment. Copyright © 2014 by the American Academy of Pediatrics.

  3. Research on the ITOC based scheduling system for ship piping production

    Science.gov (United States)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  4. Real-time Energy Resource Scheduling considering a Real Portuguese Scenario

    DEFF Research Database (Denmark)

    Silva, Marco; Sousa, Tiago; Morais, Hugo

    2014-01-01

    The development in power systems and the introduction of decentralized gen eration and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which...... scheduling in smart grids, considering day - ahead, hour - ahead and real - time scheduling. The case study considers a 33 - bus distribution network with high penetration of distributed energy resources . The wind generation profile is base d o n a rea l Portuguese wind farm . Four scenarios are presented...... taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour - ahead and real - time scheduling...

  5. Social Withdrawal Behaviour at One Year of Age Is Associated with Delays in Reaching Language Milestones in the EDEN Mother-Child Cohort Study.

    Directory of Open Access Journals (Sweden)

    Antoine Guedeney

    Full Text Available The aim of the study was to examine the relationship between social withdrawal behaviour at one year and motor and language milestones.One-year old children from the EDEN French population-based birth cohort study (Study on the pre- and postnatal determinants of the child's development and prospective health Birth Cohort Study were included. Social withdrawal at one year was assessed by trained midwives using the Alarm Distress BaBy (ADBB scale. Midwives concurrently examined infants' motor and language milestones. Parents reported on child's psychomotor and language milestones, during the interview with the midwife.After adjusting for potential confounding factors, social withdrawal behaviour was significantly associated with concurrent delays in motor and language milestones assessed by the midwife or the parents.Higher scores on social withdrawal behaviour as assessed with the ADBB were associated with delays in reaching language milestones, and to a lesser extent with lower motor ability scores. Taking the contribution of social withdrawal behaviour into account may help understand the unfolding of developmental difficulties in children.

  6. Social Withdrawal Behaviour at One Year of Age Is Associated with Delays in Reaching Language Milestones in the EDEN Mother-Child Cohort Study.

    Science.gov (United States)

    Guedeney, Antoine; Forhan, Anne; Larroque, Beatrice; de Agostini, Maria; Pingault, Jean-Baptiste; Heude, Barbara

    2016-01-01

    The aim of the study was to examine the relationship between social withdrawal behaviour at one year and motor and language milestones. One-year old children from the EDEN French population-based birth cohort study (Study on the pre- and postnatal determinants of the child's development and prospective health Birth Cohort Study) were included. Social withdrawal at one year was assessed by trained midwives using the Alarm Distress BaBy (ADBB) scale. Midwives concurrently examined infants' motor and language milestones. Parents reported on child's psychomotor and language milestones, during the interview with the midwife. After adjusting for potential confounding factors, social withdrawal behaviour was significantly associated with concurrent delays in motor and language milestones assessed by the midwife or the parents. Higher scores on social withdrawal behaviour as assessed with the ADBB were associated with delays in reaching language milestones, and to a lesser extent with lower motor ability scores. Taking the contribution of social withdrawal behaviour into account may help understand the unfolding of developmental difficulties in children.

  7. Scheduling in Heterogeneous Grid Environments: The Effects of DataMigration

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this goal can be fully realized. One problem critical to the effective utilization of computational grids is efficient job scheduling. Our prior work addressed this challenge by defining a grid scheduling architecture and several job migration strategies. The focus of this study is to explore the impact of data migration under a variety of demanding grid conditions. We evaluate our grid scheduling algorithms by simulating compute servers, various groupings of servers into sites, and inter-server networks, using real workloads obtained from leading supercomputing centers. Several key performance metrics are used to compare the behavior of our algorithms against reference local and centralized scheduling schemes. Results show the tremendous benefits of grid scheduling, even in the presence of input/output data migration - while highlighting the importance of utilizing communication-aware scheduling schemes.

  8. Preparing medical students for obstetrics and gynecology milestone level one: a description of a pilot curriculum

    Directory of Open Access Journals (Sweden)

    Helen Morgan

    2014-11-01

    Full Text Available Background: The implementation of the Accreditation Council for Graduate Medical Education (ACGME Milestones in the field of obstetrics and gynecology has arrived with Milestones Level One defined as the level expected of an incoming first-year resident. Purpose: We designed, implemented, and evaluated a 4-week elective for fourth-year medical school students, which utilized a multimodal approach to teaching and assessing the Milestones Level One competencies. Methods: The 78-hour curriculum utilized traditional didactic lectures, flipped classroom active learning sessions, a simulated paging curriculum, simulation training, embalmed cadaver anatomical dissections, and fresh-frozen cadaver operative procedures. We performed an assessment of student knowledge and surgical skills before and after completion of the course. Students also received feedback on their assessment and management of eight simulated paging scenarios. Students completed course content satisfaction surveys at the completion of each of the 4 weeks. Results: Students demonstrated improvement in knowledge and surgical skills at the completion of the course. Paging confidence trended toward improvement at the completion of the course. Student satisfaction was high for all of the course content, and the active learning components of the curriculum (flipped classroom, simulation, and anatomy sessions had higher scores than the traditional didactics in all six categories of our student satisfaction survey. Conclusions: This pilot study demonstrates a practical approach for preparing fourth-year medical students for the expectations of Milestones Level One in obstetrics and gynecology. This curriculum can serve as a framework as medical schools and specific specialties work to meet the first steps of the ACGME's Next Accreditation System.

  9. IEEE Milestone at CERN - W Cleon Anderson (right), president of the Institute of Electrical and Electronics Engineers, unveils the Milestone plaque at CERN, together with Georges Charpak

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    At a ceremony on 26 September at CERN, W Cleon Anderson, president of the Institute of Electrical and Electronics Engineers (IEEE), formally dedicated a "Milestone" plaque in recognition of the invention of electronic particle detectors at CERN. The plaque was unveiled by Anderson and Georges Charpak, the Nobel-prize winning inventor of wire-chamber technology at CERN.

  10. Correlations Between Ratings on the Resident Annual Evaluation Summary and the Internal Medicine Milestones and Association With ABIM Certification Examination Scores Among US Internal Medicine Residents, 2013-2014.

    Science.gov (United States)

    Hauer, Karen E; Vandergrift, Jonathan; Hess, Brian; Lipner, Rebecca S; Holmboe, Eric S; Hood, Sarah; Iobst, William; Hamstra, Stanley J; McDonald, Furman S

    2016-12-06

    US internal medicine residency programs are now required to rate residents using milestones. Evidence of validity of milestone ratings is needed. To compare ratings of internal medicine residents using the pre-2015 resident annual evaluation summary (RAES), a nondevelopmental rating scale, with developmental milestone ratings. Cross-sectional study of US internal medicine residency programs in the 2013-2014 academic year, including 21 284 internal medicine residents (7048 postgraduate-year 1 [PGY-1], 7233 PGY-2, and 7003 PGY-3). Program director ratings on the RAES and milestone ratings. Correlations of RAES and milestone ratings by training year; correlations of medical knowledge ratings with American Board of Internal Medicine (ABIM) certification examination scores; rating of unprofessional behavior using the 2 systems. Corresponding RAES ratings and milestone ratings showed progressively higher correlations across training years, ranging among competencies from 0.31 (95% CI, 0.29 to 0.33) to 0.35 (95% CI, 0.33 to 0.37) for PGY-1 residents to 0.43 (95% CI, 0.41 to 0.45) to 0.52 (95% CI, 0.50 to 0.54) for PGY-3 residents (all P values internal medicine residents in the 2013-2014 academic year, milestone-based ratings correlated with RAES ratings but with a greater difference across training years. Both rating systems for medical knowledge correlated with ABIM certification examination scores. Milestone ratings may better detect problems with professionalism. These preliminary findings may inform establishment of the validity of milestone-based assessment.

  11. Completion of Level 4 Milestone M4AT-15OR2301039 for the Johnson Noise Thermometry for Drift-free Temperature Measurements Work Package AT-15OR230103

    Energy Technology Data Exchange (ETDEWEB)

    Britton Jr, Charles L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-14

    This memorandum constitutes our September 2015 level 4 milestone for the project entitled “Johnson Noise Thermometry for Drift-free Temperature Measurements” and satisfies the Milestone/Activity (Conclude HFIR field demonstration of JNT prototype). The progress summary describes the work performed to complete the subject milestone.

  12. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    Science.gov (United States)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  13. Generating unit maintenance scheduling under competitive market environments

    International Nuclear Information System (INIS)

    Jin Ho Kim; Jong Bae Park; Jong Keun Park; Yeung Han Chun

    2005-01-01

    A novel approach to a generating unit maintenance scheduling problem in competitive electricity markets is presented in this paper. The objective is to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoint of the generating unit maintenance scheduling (GMS) game and for obtaining the equilibrium solution for the GMS game. The GMS problem is formulated as a dynamic non-cooperative game with complete information. The players correspond to profit maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal schedule is defined by Nash equilibrium (equilibriums) of the game. Numerical results for two-Genco system are used to demonstrate that the proposed framework can be successfully applied to analyzing the strategic behaviors of each Genco and to obtaining the corresponding Nash equilibrium. The result indicates that generating unit maintenance schedule is one of the major strategic behaviors whereby Genco maximize their profits in a competitive market environment. (author)

  14. CLIC CRAB CAVITY SPECIFICATIONS MILESTONE: M10.3.4

    CERN Document Server

    Ambattu, P; Dexter, A; Jones, R; McIntosh, P; Shinton, I

    2010-01-01

    The starting point of Sub-task 2 is to document the currently anticipated requirements for the CLIC crab cavity system. This milestone concerns completion of the basic specifications for the CLIC crab cavity system. This comprises kick, power requirement, phase and amplitude stability, technology choice, and RF layout. The wakefield calculations of a baseline CLIC cavity will be used to estimate the required damping of the higher order modes as well as other special modes in crab cavities (the lower and same order modes).

  15. The Fifth Milestone in the Development of Chinese Language

    Directory of Open Access Journals (Sweden)

    Mateja PETROVČIČ

    2013-04-01

    Full Text Available Chinese language has changed drastically in the recent century. Papers on the language development mainly stress four big events in the Chinese history that imposed changes in language, i.e. The May Fourth Movement (1919, establishment of the People’s Republic of China (1949, Cultural Revolution (1966, and China’s reform and opening (1978. According to the features of recent neologisms, we suggest that the widening gap between rich and poor should be considered as the fifth milestone for changes in Chinese language.

  16. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  17. System Certification Procedures and Criteria Manual for Deep Submergence Systems

    Science.gov (United States)

    1973-07-01

    safety of the DSS personnel. Milestone Event Schedule A lit of sequential events in the certification process with estimated completion dates. Non...milestone event schedule should include a list of sequential events in the Certification process with estimated dates of completion. The time...valve lineup during flush and the direction of flow. In addition, if flushing blocks are used, the removed valve inter- nals should be cleaned in

  18. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  19. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. The association of 2-year-old training milestones with career length and racing success in a sample of Thoroughbred horses in New Zealand.

    Science.gov (United States)

    Tanner, J C; Rogers, C W; Firth, E C

    2013-01-01

    There is increasing evidence that exercise early in life has a positive effect on musculoskeletal health. At present, there is little whole population research investigating the effect of racing as 2-year-olds on future racing career. To investigate the association between attaining training milestones as 2-year-olds with length of career and racing success in Thoroughbred horses in New Zealand. Retrospective data were obtained of the 2001/02-born Thoroughbred foal crop. The 3 training milestones were: registered with a trainer, trialled and raced. The association of the training milestones with career length was measured using the outcomes: number of race starts and number of years raced, in a Cox regression model. Logistic regression models analysed the association of the training milestones with the outcomes: won or placed in a race. Linear regression was performed to assess the association of training milestones with total career earnings. Of 4683 horses in the population; 3152 horses were registered with a trainer, 2661 horses trialled and 2109 horses raced. Horses that raced as 2-year-olds had significantly (PHorses that raced as 2-year-olds had significantly (PHorses registered with a trainer, trialled or raced as 2-year-olds were more likely to have won or been placed in a race than those that achieved the milestones as 3-year-olds or older. Horses that first trialled and raced as 2-year-olds had greater total earnings than those that first trialled or raced at a later age. Two-year-old training milestones had a strong association with positive racing career outcomes. Horses in training or racing as 2-year-olds may have better musculoskeletal health throughout life than horses that are first in training or racing at a later age. © 2012 EVJ Ltd.

  1. Endorsement and Timing of Sexual Orientation Developmental Milestones Among Sexual Minority Young Adults in the Growing Up Today Study.

    Science.gov (United States)

    Katz-Wise, Sabra L; Rosario, Margaret; Calzo, Jerel P; Scherer, Emily A; Sarda, Vishnudas; Austin, S Bryn

    2017-02-01

    This research examined endorsement and timing of sexual orientation developmental milestones. Participants were 1,235 females and 398 males from the Growing Up Today Study, ages 22 to 29 years, who endorsed a sexual minority orientation (lesbian/gay, bisexual, mostly heterosexual) or reported same-gender sexual behavior (heterosexual with same-gender sexual experience). An online survey measured current sexual orientation and endorsement and timing (age first experienced) of five sexual orientation developmental milestones: same-gender attractions, other-gender attractions, same-gender sexual experience, other-gender sexual experience, and sexual minority identification. Descriptive analyses and analyses to test for gender and sexual orientation group differences were conducted. Results indicated that women were more likely than men to endorse same-gender attraction, other-gender attraction, and other-gender sexual experience, with the most gender differences in endorsement among mostly heterosexuals and heterosexuals with same-gender sexual experience. In general, men reached milestones earlier than women, with the most gender differences in timing among lesbian and gay individuals and heterosexuals with same-gender sexual experience. Results suggest that the three sexual minority developmental milestones may best characterize the experiences of lesbians, gay males, and female and male bisexuals. More research is needed to understand sexual orientation development among mostly heterosexuals and heterosexuals with same-gender sexual experience.

  2. Endorsement and Timing of Sexual Orientation Developmental Milestones Among Sexual Minority Young Adults in the Growing Up Today Study

    Science.gov (United States)

    Katz-Wise, Sabra L.; Rosario, Margaret; Calzo, Jerel P.; Scherer, Emily A.; Sarda, Vishnudas; Austin, S. Bryn

    2017-01-01

    This research examined endorsement and timing of sexual orientation developmental milestones. Participants were 1235 females and 398 males from the Growing Up Today Study, ages 22 to 29 years, who endorsed a sexual minority orientation (lesbian/gay, bisexual, mostly heterosexual) or reported same-gender sexual behavior (heterosexual with same-gender sexual experience). An online survey measured current sexual orientation and endorsement and timing (age first experienced) of five sexual orientation developmental milestones: same-gender attractions, other-gender attractions, same-gender sexual experience, other-gender sexual experience, and sexual minority identification. Descriptive analyses and analyses to test for gender and sexual orientation group differences were conducted. Results indicated that females were more likely than males to endorse same-gender attraction, other-gender attraction, and other-gender sexual experience, with the most gender differences in endorsement among mostly heterosexuals and heterosexuals with same-gender sexual experience. In general, males reached milestones earlier than females, with the most gender differences in timing among lesbian and gay individuals and heterosexuals with same-gender sexual experience. Results suggest that the three sexual minority developmental milestones may best characterize the experiences of lesbians, gay males, and female and male bisexuals. More research is needed to understand sexual orientation development among mostly heterosexuals and heterosexuals with same-gender sexual experience. PMID:27148762

  3. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  4. 20 CFR 411.555 - Can the EN keep the milestone and outcome payments even if the beneficiary does not achieve all...

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Can the EN keep the milestone and outcome payments even if the beneficiary does not achieve all outcome months? 411.555 Section 411.555 Employees... Payment Systems § 411.555 Can the EN keep the milestone and outcome payments even if the beneficiary does...

  5. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  6. Milestone compliance and value conflicts: Impediments to siting

    International Nuclear Information System (INIS)

    English, M.R.

    1987-01-01

    As compact regions and host states try to fulfill their responsibilities under the 1980 Low-Level Radioactive Waste Policy Act (LLWPA) and its 1985 amendments, they are caught between the competing demands of their stakeholders. These demands are based for the most part on legitimate interests and strongly held principles. But to the extent that those interests and principles differ among stakeholders, conflicts occur -- conflicts that may make meeting the LLWPA milestones difficult if not impossible. This paper, which is part of a multidisciplinary research project on value issues in radioactive waste management, considers where those conflicts are most likely to crop up and some of their root causes

  7. 1.2.1.1 Harvest, Collection and Storage Quarter 3 Milestone Report

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, Lynn M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, William A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cafferty, Kara G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bonner, Ian J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Huang, Qiyang [Idaho National Lab. (INL), Idaho Falls, ID (United States); Colby, Rachel D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-07-01

    Single pass baling of corn stover is required in order to meet targets for the herbaceous biomass 2017 logistics design case. Single-pass pass stover harvest is based on the grain harvest and generally results in stover with a moisture content of 30-50% wet basis (w.b). Aerobic storage of corn stover with high moisture results in high levels of dry matter loss (DML), up to 25%. Anaerobic storage (ensiling) reduces DML to less than 5%, but additional costs are associated with handling and transporting the extra moisture in the biomass. This milestone provides a best-estimate of costs for using high moisture feedstock within the conventional baled logistics system. The costs of three (3) anaerobic storage systems that reduce dry matter losses (bale wrap, silage tube, and silage drive over pile) are detailed in this milestone and compared to both a conventional dry-baled corn stover case and a high moisture bale case, both stored aerobically. The total logistics cost (harvest, collection, storage, and transportation) of the scenarios are as follows: the conventional multi-pass dry bale case and the single-pass high moisture case stored aerobically were nearly equivalent at $61.15 and $61.24/DMT. The single-pass bale wrap case was the lowest at $57.63/DMT. The bulk anaerobic cases were the most expensive at $84.33 for the silage tube case and $75.97 for the drive over pile, which reflect the additional expense of transporting high-moisture bulk material; however, a reduction in preprocessing costs may occur because these feedstocks are size reduced in the field. In summary, the costs estimates presented in this milestone report can be used to determine if anaerobic storage of high-moisture corn stover is an economical option for dry matter preservation.

  8. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  9. Timing of motor milestones achievement and development of overweight in childhood: a study within the Danish National Birth Cohort.

    Science.gov (United States)

    Schmidt Morgen, C; Andersen, A M N; Due, P; Neelon, S B; Gamborg, M; Sørensen, T I A

    2014-08-01

    Overweight may hinder achievement of gross motor milestones and delayed achievement of milestones may increase the risk of later overweight for reasons involving physical activity and the building of lean body mass. To investigate whether increased birth weight and body mass index (BMI) at 5 months is associated with the achievement of the ability to sit up and walk and whether delayed achievement of these milestones is associated with overweight at age 7 years. We used data from the Danish National Birth Cohort on 25,148 children born between 1998 and 2003. Follow-up took place from 2003 to 2010. Mean age at follow-up was 7.04 years. We used logistic and linear regression analyses. Birth weight and BMI at 5 months were marginally associated with earlier achievement of the ability to sit up and walk (regression coefficients between -0.027 months; [CI -0.042; -0.013] and -0.092 months [CI -0.118; -0.066]). Age in months of sitting and walking were not associated with overweight at age 7 years (ORs between 0.97 [CI 0.95-1.00] and 1.00 [CI 0.96-1.04]). Later achievement of sitting and walking predicted lower BMI at age 7 years (ln-BMI -z-scores between -0.023 [CI -0.029; -0.017] and -0.005 [CI -0.015; 0.005)). All observed associations were of negligible magnitude and we conclude that birth weight or BMI at age 5 months and motor milestones appear largely independent of each other and that timing of achievement of motor milestones seems not to be associated with later overweight or increased BMI. © 2013 The Authors. Pediatric Obesity © 2013 International Association for the Study of Obesity.

  10. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  11. Summary Report for ASC L2 Milestone #4782: Assess Newly Emerging Programming and Memory Models for Advanced Architectures on Integrated Codes

    Energy Technology Data Exchange (ETDEWEB)

    Neely, J. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hornung, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Black, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Robinson, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-09-29

    This document serves as a detailed companion to the powerpoint slides presented as part of the ASC L2 milestone review for Integrated Codes milestone #4782 titled “Assess Newly Emerging Programming and Memory Models for Advanced Architectures on Integrated Codes”, due on 9/30/2014, and presented for formal program review on 9/12/2014. The program review committee is represented by Mike Zika (A Program Project Lead for Kull), Brian Pudliner (B Program Project Lead for Ares), Scott Futral (DEG Group Lead in LC), and Mike Glass (Sierra Project Lead at Sandia). This document, along with the presentation materials, and a letter of completion signed by the review committee will act as proof of completion for this milestone.

  12. Collider baseline parameters: Milestone M1.5

    CERN Document Server

    Schulte, Daniel

    2016-01-01

    The deliverable D1.1 provided a preliminary specification of the layout and target operation parameters for the FCC-hh hadron collider concept. It serves as the basis for the studies in all work packages. Tis milestone summarises the outcome of the first studies of this design. The goal of the FCC hadron collider is to provide proton-proton collisions at a centre-of-mass energy of 100 TeV. The machine is compatible with ion beam operation. Assuming a nominal dipole field of 16 T, such a machine is based on a perimeter of 100 km. The machine is designed to accommodate two main proton experiments that are operated simultaneously. The machine delivers a peak luminosity of 5-30 x 1034 cm-2s-1. The layout allows for two additional special-purpose experiments.

  13. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  14. NWTS waste package program plan. Volume I. Program strategy, description, and schedule

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  15. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  16. Early milestones in the understanding of echolocation in bats.

    Science.gov (United States)

    Grinnell, Alan D

    2018-04-23

    Almost 80 years ago, Griffin and Galambos discovered the phenomenon of echolocation in bats. Since then, the field has grown exponentially as new generations of investigators have joined the chase and technological advances have revolutionized working with ultrasound in the laboratory and in the field. Today our understanding of the diversity of behavioral and neural adaptations for echolocation constitutes one of the paramount triumphs of neuroethology. At the invitation of the editor in chief, I here review some of the important milestones in the discovery and early understanding of echolocation in bats through about the mid-1980s.

  17. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  18. Milestones on a Shoestring: A Cost-Effective, Semi-automated Implementation of the New ACGME Requirements for Radiology.

    Science.gov (United States)

    Schmitt, J Eric; Scanlon, Mary H; Servaes, Sabah; Levin, Dayna; Cook, Tessa S

    2015-10-01

    The advent of the ACGME's Next Accreditation System represents a significant new challenge for residencies and fellowships, owing to its requirements for more complex and detailed information. We developed a system of online assessment tools to provide comprehensive coverage of the twelve ACGME Milestones and digitized them using freely available cloud-based productivity tools. These tools include a combination of point-of-care procedural assessments, electronic quizzes, online modules, and other data entry forms. Using free statistical analytic tools, we also developed an automated system for management, processing, and data reporting. After one year of use, our Milestones project has resulted in the submission of over 20,000 individual data points. The use of automated statistical methods to generate resident-specific profiles has allowed for dynamic reports of individual residents' progress. These profiles both summarize data and also allow program directors access to more granular information as needed. Informatics-driven strategies for data assessment and processing represent feasible solutions to Milestones assessment and analysis, reducing the potential administrative burden for program directors, residents, and staff. Copyright © 2015 AUR. Published by Elsevier Inc. All rights reserved.

  19. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  20. Attainment of gross motor milestones by preterm children with normal development upon school entry

    NARCIS (Netherlands)

    van Dokkum, Nienke H; de Kroon, Marlou L A; Bos, Arend F; Reijneveld, Sijmen A; Kerstjens, Jorien M

    BACKGROUND: Little is known on the motor development of moderately preterm born (MPT) children, in comparison with early preterm born (EPT) children and fullterm born (FT), for children with normal motor outcomes at school entry. AIMS: To compare attainment rates of gross motor milestones reached

  1. GLOA: A New Job Scheduling Algorithm for Grid Computing

    Directory of Open Access Journals (Sweden)

    Zahra Pooranian

    2013-03-01

    Full Text Available The purpose of grid computing is to produce a virtual supercomputer by using free resources available through widespread networks such as the Internet. This resource distribution, changes in resource availability, and an unreliable communication infrastructure pose a major challenge for efficient resource allocation. Because of the geographical spread of resources and their distributed management, grid scheduling is considered to be a NP-complete problem. It has been shown that evolutionary algorithms offer good performance for grid scheduling. This article uses a new evaluation (distributed algorithm inspired by the effect of leaders in social groups, the group leaders' optimization algorithm (GLOA, to solve the problem of scheduling independent tasks in a grid computing system. Simulation results comparing GLOA with several other evaluation algorithms show that GLOA produces shorter makespans.

  2. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  3. Design Principles and Algorithms for Air Traffic Arrival Scheduling

    Science.gov (United States)

    Erzberger, Heinz; Itoh, Eri

    2014-01-01

    This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

  4. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR (Integral Fast Reactor) program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. (author)

  5. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. 5 refs., 4 figs

  6. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  7. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  8. IMPACT OF BUFFER SIZE ON PQRS AND D-PQRS SCHEDULING ALGORITHMS

    OpenAIRE

    N. Narayanan Prasanth; Kannan Balasubramanian; R. Chithra Devi

    2016-01-01

    Most of the internet applications required high speed internet connectivity. Crosspoint Buffered Switches are widely used switching architectures and designing a scheduling algorithm is a major challenge. PQRS and D-PQRS are the two most successful schedulers used in Crosspoint Buffered Switches under unicast traffic. In this paper, we analysed the performance of PQRS and DPQRS algorithms by varying the crosspoint buffer size. Simulation result shows the delay performance of the switch increa...

  9. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  10. Impact on house staff evaluation scores when changing from a Dreyfus- to a Milestone-based evaluation model: one internal medicine residency program's findings

    Directory of Open Access Journals (Sweden)

    Karen A. Friedman

    2014-11-01

    Full Text Available Purpose: As graduate medical education (GME moves into the Next Accreditation System (NAS, programs must take a critical look at their current models of evaluation and assess how well they align with reporting outcomes. Our objective was to assess the impact on house staff evaluation scores when transitioning from a Dreyfus-based model of evaluation to a Milestone-based model of evaluation. Milestones are a key component of the NAS. Method: We analyzed all end of rotation evaluations of house staff completed by faculty for academic years 2010–2011 (pre-Dreyfus model and 2011–2012 (post-Milestone model in one large university-based internal medicine residency training program. Main measures included change in PGY-level average score; slope, range, and separation of average scores across all six Accreditation Council for Graduate Medical Education (ACGME competencies. Results: Transitioning from a Dreyfus-based model to a Milestone-based model resulted in a larger separation in the scores between our three post-graduate year classes, a steeper progression of scores in the PGY-1 class, a wider use of the 5-point scale on our global end of rotation evaluation form, and a downward shift in the PGY-1 scores and an upward shift in the PGY-3 scores. Conclusions: For faculty trained in both models of assessment, the Milestone-based model had greater discriminatory ability as evidenced by the larger separation in the scores for all the classes, in particular the PGY-1 class.

  11. Impact on house staff evaluation scores when changing from a Dreyfus- to a Milestone-based evaluation model: one internal medicine residency program's findings.

    Science.gov (United States)

    Friedman, Karen A; Balwan, Sandy; Cacace, Frank; Katona, Kyle; Sunday, Suzanne; Chaudhry, Saima

    2014-01-01

    As graduate medical education (GME) moves into the Next Accreditation System (NAS), programs must take a critical look at their current models of evaluation and assess how well they align with reporting outcomes. Our objective was to assess the impact on house staff evaluation scores when transitioning from a Dreyfus-based model of evaluation to a Milestone-based model of evaluation. Milestones are a key component of the NAS. We analyzed all end of rotation evaluations of house staff completed by faculty for academic years 2010-2011 (pre-Dreyfus model) and 2011-2012 (post-Milestone model) in one large university-based internal medicine residency training program. Main measures included change in PGY-level average score; slope, range, and separation of average scores across all six Accreditation Council for Graduate Medical Education (ACGME) competencies. Transitioning from a Dreyfus-based model to a Milestone-based model resulted in a larger separation in the scores between our three post-graduate year classes, a steeper progression of scores in the PGY-1 class, a wider use of the 5-point scale on our global end of rotation evaluation form, and a downward shift in the PGY-1 scores and an upward shift in the PGY-3 scores. For faculty trained in both models of assessment, the Milestone-based model had greater discriminatory ability as evidenced by the larger separation in the scores for all the classes, in particular the PGY-1 class.

  12. Using a vision cognitive algorithm to schedule virtual machines

    Directory of Open Access Journals (Sweden)

    Zhao Jiaqi

    2014-09-01

    Full Text Available Scheduling virtual machines is a major research topic for cloud computing, because it directly influences the performance, the operation cost and the quality of services. A large cloud center is normally equipped with several hundred thousand physical machines. The mission of the scheduler is to select the best one to host a virtual machine. This is an NPhard global optimization problem with grand challenges for researchers. This work studies the Virtual Machine (VM scheduling problem on the cloud. Our primary concern with VM scheduling is the energy consumption, because the largest part of a cloud center operation cost goes to the kilowatts used. We designed a scheduling algorithm that allocates an incoming virtual machine instance on the host machine, which results in the lowest energy consumption of the entire system. More specifically, we developed a new algorithm, called vision cognition, to solve the global optimization problem. This algorithm is inspired by the observation of how human eyes see directly the smallest/largest item without comparing them pairwisely. We theoretically proved that the algorithm works correctly and converges fast. Practically, we validated the novel algorithm, together with the scheduling concept, using a simulation approach. The adopted cloud simulator models different cloud infrastructures with various properties and detailed runtime information that can usually not be acquired from real clouds. The experimental results demonstrate the benefit of our approach in terms of reducing the cloud center energy consumption

  13. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  14. Sharing Data for Production Scheduling Using the ISA-95 Standard

    Energy Technology Data Exchange (ETDEWEB)

    Harjunkoski, Iiro, E-mail: iiro.harjunkoski@de.abb.com; Bauer, Reinhard [ABB Corporate Research, Industrial Software and Applications, Ladenburg (Germany)

    2014-10-21

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  15. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  16. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  17. Assessing Team Leadership in Emergency Medicine: The Milestones and Beyond.

    Science.gov (United States)

    Rosenman, Elizabeth D; Branzetti, Jeremy B; Fernandez, Rosemarie

    2016-07-01

    Team leadership is a critical skill for emergency medicine physicians that directly affects team performance and the quality of patient care. There exists a robust body of team science research supporting team leadership conceptual models and behavioral skill sets. However, to date, this work has not been widely incorporated into health care team leadership education. This narrative review has 3 aims: (1) to synthesize the team science literature and to translate important concepts and models to health care team leadership; (2) to describe how team leadership is currently represented in the health care literature and in the Accreditation Council for Graduate Medical Education Milestones for emergency medicine; and (3) to propose a novel, evidence-based framework for the assessment of team leadership in emergency medicine. We conducted a narrative review of the team science and health care literature. We summarized our findings and identified a list of team leadership behaviors that were then used to create a framework for team leadership assessment. Current health care team leadership measurement tools do not incorporate evidence-based models of leadership concepts from other established domains. The emergency medicine milestones include several team leadership behaviors as part of a larger resident evaluation program. However, they do not offer a comprehensive or cohesive representation of the team leadership construct. Despite the importance of team leadership to patient care, there is no standardized approach to team leadership assessment in emergency medicine. Based on the results of our review, we propose a novel team leadership assessment framework that is supported by the team science literature.

  18. 18 CFR 740.2 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... water management problems of the State and have a specific purpose or objective. Activities are further..., which shall begin during the fiscal year as defined above, during which program funds are authorized to.... Milestones mean key events in the activity implementation schedule. Milestones indicate important dates for...

  19. 77 FR 76078 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-26

    ... amendment revised the scope of Cyber Security Plan (CSP) Implementation Schedule Milestone 6 and paragraph 2... technical cyber security controls only. The operational and management controls, as described in Nuclear... the cyber security program (Milestone 8). Thus, all CSP activities would be fully implemented by the...

  20. Multiple routes and milestones in the folding of HIV-1 protease monomer.

    Directory of Open Access Journals (Sweden)

    Massimiliano Bonomi

    Full Text Available Proteins fold on a time scale incompatible with a mechanism of random search in conformational space thus indicating that somehow they are guided to the native state through a funneled energetic landscape. At the same time the heterogeneous kinetics suggests the existence of several different folding routes. Here we propose a scenario for the folding mechanism of the monomer of HIV-1 protease in which multiple pathways and milestone events coexist. A variety of computational approaches supports this picture. These include very long all-atom molecular dynamics simulations in explicit solvent, an analysis of the network of clusters found in multiple high-temperature unfolding simulations and a complete characterization of free-energy surfaces carried out using a structure-based potential at atomistic resolution and a combination of metadynamics and parallel tempering. Our results confirm that the monomer in solution is stable toward unfolding and show that at least two unfolding pathways exist. In our scenario, the formation of a hydrophobic core is a milestone in the folding process which must occur along all the routes that lead this protein towards its native state. Furthermore, the ensemble of folding pathways proposed here substantiates a rational drug design strategy based on inhibiting the folding of HIV-1 protease.

  1. IFR fuel cycle

    International Nuclear Information System (INIS)

    Battles, J.E.; Miller, W.E.; Lineberry, M.J.; Phipps, R.D.

    1992-01-01

    The next major milestone of the IFR program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase, which includes completion of facility modifications and installation and cold checkout of process equipment. This paper reviews the development of the electrorefining pyroprocess, the design and construction of the facility for the hot demonstration, the design and fabrication of the equipment, and the schedule and initial plan for its operation

  2. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  3. Developmental milestones for productivity occupations in children and youth: An integrative review.

    Science.gov (United States)

    d'Entremont, Lisette; Gregor, Megan; Kirou, Evangelia; Nelligan, Lindsay; Dennis, Donna

    2017-01-01

    Limited research exists on developmental milestones for productivity occupations throughout the paediatric lifespan, and negative connotations of work for children and youth may have contributed to a paucity of literature on the topic. To ascertain what is currently known about the timing and types of engagement in productivity occupations in children and youth aged 4-19. Literature referencing productive occupations in children and youth aged 4-19 was searched for this integrative review. Search terms were established based on paediatric age and occupational therapy descriptors, and terminology associated with productivity. Sixty-seven peer-reviewed articles were analyzed according to the constant comparative method. Six core productive occupations emerged as avenues for productive engagement: paid work, school-related activities, caring for self and others, household chores, volunteering, and agricultural chores. A timeline was constructed to display common milestones for engagement in these occupations throughout the paediatric lifespan. Paediatric engagement was found to be influenced by personal (age, gender, child and youth perceptions, and safety considerations), and environmental (familial factors, parental perceptions, societal influences, and safety considerations) factors. Approaches to paediatric practice must account for the full spectrum of productive occupations children and youth engage in beyond the school context.

  4. 1997 Hanford site report on land disposal restrictions for mixed waste

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1997-04-07

    The baseline land disposal restrictions (LDR) plan was prepared in 1990 in accordance with the Hanford Federal Facility Agreement and Consent Order (commonly referred to as the Tn-Party Agreement) Milestone M-26-00 (Ecology et al, 1989). The text of this milestone is below. ''LDR requirements include limitations on storage of specified hazardous wastes (including mixed wastes). In accordance with approved plans and schedules, the U.S. Department of Energy (DOE) shall develop and implement technologies necessary to achieve full compliance with LDR requirements for mixed wastes at the Hanford Site. LDR plans and schedules shall be developed with consideration of other action plan milestones and will not become effective until approved by the U.S. Environmental Protection Agency (EPA) (or Washington State Department of Ecology [Ecology]) upon authorization to administer LDRs pursuant to Section 3006 of the Resource Conservation and Recovery Act of 1976 (RCRA). Disposal of LDR wastes at any time is prohibited except in accordance with applicable LDR requirements for nonradioactive wastes at all times. The plan will include, but not be limited to, the following: Waste characterization plan; Storage report; Treatment report; Treatment plan; Waste minimization plan; A schedule depicting the events necessary to achieve full compliance with LDR requirements; and A process for establishing interim milestones.

  5. 1997 Hanford site report on land disposal restrictions for mixed waste

    International Nuclear Information System (INIS)

    Black, D.G.

    1997-01-01

    The baseline land disposal restrictions (LDR) plan was prepared in 1990 in accordance with the Hanford Federal Facility Agreement and Consent Order (commonly referred to as the Tn-Party Agreement) Milestone M-26-00 (Ecology et al, 1989). The text of this milestone is below. ''LDR requirements include limitations on storage of specified hazardous wastes (including mixed wastes). In accordance with approved plans and schedules, the U.S. Department of Energy (DOE) shall develop and implement technologies necessary to achieve full compliance with LDR requirements for mixed wastes at the Hanford Site. LDR plans and schedules shall be developed with consideration of other action plan milestones and will not become effective until approved by the U.S. Environmental Protection Agency (EPA) (or Washington State Department of Ecology [Ecology]) upon authorization to administer LDRs pursuant to Section 3006 of the Resource Conservation and Recovery Act of 1976 (RCRA). Disposal of LDR wastes at any time is prohibited except in accordance with applicable LDR requirements for nonradioactive wastes at all times. The plan will include, but not be limited to, the following: Waste characterization plan; Storage report; Treatment report; Treatment plan; Waste minimization plan; A schedule depicting the events necessary to achieve full compliance with LDR requirements; and A process for establishing interim milestones

  6. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  7. Influence of economic factor and site milestones on the salience of environmental issues at Department of Energy sites

    International Nuclear Information System (INIS)

    O'Connor, S.; Yin, J.

    1997-01-01

    The change in the US Department of Energy's (DOE) mission from nuclear weapons production to remediation and restoration of its installations, in 1989, challenged all citizens around the nation's weapons complex to get involved in DOE's environmental management decision-making process. The purpose of this study is to determine whether, and to what extent, economic factors and site milestones influence the rise and fall of environmental issues and participation. One might believe that citizen participation would be influenced by economic conditions, particularly with the down-sizing that occurred at many DOE sites. Another factor that might influence salience of environmental issues is the occurrence of crucial events, or site milestones. Important events occurring at DOE installations are well publicized by local and national media, and citizens' interest and opinions are influenced by media. In this study, the authors use the number of comments expressed by the public and Indian tribes as a measure of public involvement and salience of issues. Their study, using multiple regression analysis, examined the relationships between the number of comments expressed and the economic conditions as indicated by monthly unemployment rates, and the relationship between the number of comments expressed and the occurrence of crucial site events or milestones

  8. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  9. Health-related quality of life, developmental milestones, and self-esteem in young adults with bleeding disorders

    NARCIS (Netherlands)

    Limperg, P.F. (P. F.); L. Haverman (Lotte); H. Maurice-Stam (Heleen); M. Coppens; Valk, C. (C.); M.J.H.A. Kruip (Marieke); J.C.J. Eikenboom (Jeroen); M. Peters; M.A. Grootenhuis (Martha)

    2017-01-01

    textabstractBackground: The treatment of bleeding disorders improved in the last decades. However, the effect of growing up with bleeding disorders on developmental, emotional, and social aspects is understudied. Therefore, this study assesses HRQOL, developmental milestones, and self-esteem in

  10. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  11. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  12. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  13. WIN Chapters: Milestones and Future Plans

    Energy Technology Data Exchange (ETDEWEB)

    Castro, P.; Pelegrí, M.

    2015-07-01

    In this paper the WIN Chapters: milestones and future plans are presented. WIN-IAEA has rewarded-in the three last years - to Australia-2014, South-Africa-2013 and Sweden-2012. WIN-Global -specially WiN IAEA- can collaborate a lot with the CTBTO presenting the content of the Treaty on the Non-Proliferation of Nuclear Weapons actually increasing the signatory members in 2015. Historical decisions on NTP are already affecting WiN IAEA. The research reactors or high flux reactors are important in the field of medical applications and other future applications. In Australia women-scientist of OPAL, can become WiN. Between the OPAL applications there is a production of silicon plates to be used in laptops/mobiles. WIN-Europe activities related with the climatic change and with the academic promotion. 2015 is also a very important year due the celebration of 20th Anniversary of WIN-Spain; plans of this Chapter and Conferences of WIN-Global are presented. In addition there are women working in ITER, in some activities in the EU, China, India, Japan, South Korea, USA and Russia both in the academic (R+D) field and into the Industry. (Author)

  14. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  15. Assessing Team Leadership in Emergency Medicine: The Milestones and Beyond

    Science.gov (United States)

    Rosenman, Elizabeth D.; Branzetti, Jeremy B.; Fernandez, Rosemarie

    2016-01-01

    Background Team leadership is a critical skill for emergency medicine physicians that directly affects team performance and the quality of patient care. There exists a robust body of team science research supporting team leadership conceptual models and behavioral skill sets. However, to date, this work has not been widely incorporated into health care team leadership education. Objective This narrative review has 3 aims: (1) to synthesize the team science literature and to translate important concepts and models to health care team leadership; (2) to describe how team leadership is currently represented in the health care literature and in the Accreditation Council for Graduate Medical Education Milestones for emergency medicine; and (3) to propose a novel, evidence-based framework for the assessment of team leadership in emergency medicine. Methods We conducted a narrative review of the team science and health care literature. We summarized our findings and identified a list of team leadership behaviors that were then used to create a framework for team leadership assessment. Results Current health care team leadership measurement tools do not incorporate evidence-based models of leadership concepts from other established domains. The emergency medicine milestones include several team leadership behaviors as part of a larger resident evaluation program. However, they do not offer a comprehensive or cohesive representation of the team leadership construct. Conclusions Despite the importance of team leadership to patient care, there is no standardized approach to team leadership assessment in emergency medicine. Based on the results of our review, we propose a novel team leadership assessment framework that is supported by the team science literature. PMID:27413434

  16. Health-related quality of life, developmental milestones, and self-esteem in young adults with bleeding disorders

    NARCIS (Netherlands)

    Limperg, P. F.; Haverman, L.; Maurice-Stam, H.; Coppens, M.; Valk, C.; Kruip, M. J. H. A.; Eikenboom, J.; Peters, M.; Grootenhuis, M. A.

    2018-01-01

    The treatment of bleeding disorders improved in the last decades. However, the effect of growing up with bleeding disorders on developmental, emotional, and social aspects is understudied. Therefore, this study assesses HRQOL, developmental milestones, and self-esteem in Dutch young adults (YA) with

  17. Real-time-service-based Distributed Scheduling Scheme for IEEE 802.16j Networks

    OpenAIRE

    Kuo-Feng Huang; Shih-Jung Wu

    2013-01-01

    Supporting Quality of Service (QoS) guarantees for diverse multimedia services is the primary concern for IEEE802.16j networks. A scheduling scheme that satisfies the QoS requirements has become more important for wireless communications. We proposed an adaptive nontransparent-based distributed scheduling scheme (ANDS) for IEEE 802.16j networks. ANDS comprises three major components: Priority Assignment, Resource Allocation, Preserved Bandwidth Adjustment. Different service-type connections p...

  18. Hanford Site performance summary -- EM funded programs, July 1995

    International Nuclear Information System (INIS)

    Schultz, E.A.

    1995-07-01

    Performance data for July 1995 reflects a 4% unfavorable schedule variance and is an improvement over June 1995. The majority of the behind schedule condition is attributed to EM-30, (Office of Waste Management). The majority of the EM-30 schedule variance is associated with the Tank Waste Remediation System (TWRS) Program. The TWRS schedule variance is attributed to the delay in obtaining key decision 0 (KD-0) for Project W-314, ''Tank Farm Restoration and Safe Operations'' and the Multi-Function Waste Tank Facility (MWTF) workscope still being a part of the baseline. Baseline Change Requests (BCRs) are in process rebaselining Project W-314 and deleting the MWTF from the TWRS baseline. Once the BCR's are approved and implemented, the overall schedule variance will be reduced to $15.0 million. Seventy-seven enforceable agreement milestones were scheduled FYTD. Seventy-one (92%) of the seventy-seven were completed on or ahead of schedule, two were completed late and four are delinquent. Performance data reflects a continued significant favorable cost variance of $124.3 million (10%). The cost variance is attributed to process improvements/efficiencies, elimination of low-value work, workforce reductions and is expected to continue for the remainder of this fiscal year. A portion of the cost variance is attributed to a delay in billings which should self-correct by fiscal year-end

  19. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  20. TECHNICAL COORDINATION,SCHEDULE AND INTEGRATION

    CERN Document Server

    A. Ball

    A pivotal milestone in CMS underground installation will be reached during this CMS week when the 1920 ton central wheel (YB0) of the iron yoke is lowered into the experimental cavern on Wednesday 28 February. This milestone will be reached on the on the date planned due to the hard work and dedication of many people, on the surface, underground and at supporting sites. Details of the programme for 28 February, visit opportunities and progress updates, can be found on the TC web pages on iCMS. http://cms.cern.ch/iCMS/jsp/page.jsp?mode=cms&ac-tion=url&urlkey=CMS_TC Heavy lowering The build-up to the above event started shortly after the December CMS week, when the YE+2 endcap disk was safely lowered into the cavern, followed by the YE+1 on January 9. The lowering of YE+1 was the most complicated so far because, due to the calorimetry nose, the centre of gravity lies outside the plane of the disk. However, after 10 hours it touched-down safely without any problems. On Jan. 19 the first barrel wheel ...

  1. Multi-User Preemptive Scheduling For Critical Low Latency Communications in 5G Networks

    DEFF Research Database (Denmark)

    Abdul-Mawgood Ali Ali Esswie, Ali; Pedersen, Klaus

    2018-01-01

    5G new radio is envisioned to support three major service classes: enhanced mobile broadband (eMBB), ultrareliable low-latency communications (URLLC), and massive machine type communications. Emerging URLLC services require up to one millisecond of communication latency with 99.999% success...... probability. Though, there is a fundamental trade-off between system spectral efficiency (SE) and achievable latency. This calls for novel scheduling protocols which cross-optimize system performance on user-centric; instead of network-centric basis. In this paper, we develop a joint multi-user preemptive...... scheduling strategy to simultaneously cross-optimize system SE and URLLC latency. At each scheduling opportunity, available URLLC traffic is always given higher priority. When sporadic URLLC traffic appears during a transmission time interval (TTI), proposed scheduler seeks for fitting the URLLC-eMBB traffic...

  2. Revisa milestones report. Task 2.1: development of material models

    International Nuclear Information System (INIS)

    Nicolas, L.

    1998-01-01

    This report is the CEA contribution to the Milestone report of the REVISA project (Task 2.1). This task is particularly devoted to the development of advanced material models. CEA uses two different constitutive concepts. The first model is a coupled damage-visco-plasticity model proposed by Lemaitre and Chaboche. The second model is a non unified visco-plasticity model proposed by Contesti and Cailletaud, where the classical decomposition of the total inelastic strain into a time independent plastic part and a time dependent creep part is assumed. The introduction of isotropic damage in this model is part of the developments presented in this report. (author)

  3. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  4. Piloting a Structured Practice Audit to Assess ACGME Milestones in Written Handoff Communication in Internal Medicine.

    Science.gov (United States)

    Martin, Shannon K; Farnan, Jeanne M; McConville, John F; Arora, Vineet M

    2015-06-01

    Written communication skills are integral to patient care handoffs. Residency programs require feasible assessment tools that provide timely formative and summative feedback, ideally linked to the Accreditation Council for Graduate Medical Education Milestones. We describe the use of 1 such tool-UPDATED-to assess written handoff communication skills in internal medicine interns. During 2012-2013, the authors piloted a structured practice audit at 1 academic institution to audit written sign-outs completed by 45 interns, using the UPDATED tool, which scores 7 aspects of sign-out communication linked to milestones. Intern sign-outs were audited by trained faculty members throughout the year. Results were incorporated into intern performance reviews and Clinical Competency Committees. A total of 136 sign-outs were audited (averaging 3.1 audits per intern). In the first trimester, 14 interns (31%) had satisfactory audit results. Five interns (11%) had critical deficiencies and received immediate feedback, and the remaining 26 (58%) were assigned future audits due to missing audits or unsatisfactory scores. In the second trimester, 21 interns (68%) had satisfactory results, 1 had critical deficiencies, and 9 (29%) required future audits. Nine of the 10 remaining interns in the final trimester had satisfactory audits. Faculty time was estimated at 10 to 15 minutes per sign-out audited. The UPDATED audit is a milestone-based tool that can be used to assess written sign-out communication skills in internal medicine residency programs. Future work is planned to adapt the tool for use by senior supervisory residents to appraise sign-outs in real time.

  5. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  6. Stem Cells of Dental Origin: Current Research Trends and Key Milestones towards Clinical Application

    Directory of Open Access Journals (Sweden)

    Athina Bakopoulou

    2016-01-01

    Full Text Available Dental Mesenchymal Stem Cells (MSCs, including Dental Pulp Stem Cells (DPSCs, Stem Cells from Human Exfoliated Deciduous teeth (SHED, and Stem Cells From Apical Papilla (SCAP, have been extensively studied using highly sophisticated in vitro and in vivo systems, yielding substantially improved understanding of their intriguing biological properties. Their capacity to reconstitute various dental and nondental tissues and the inherent angiogenic, neurogenic, and immunomodulatory properties of their secretome have been a subject of meticulous and costly research by various groups over the past decade. Key milestone achievements have exemplified their clinical utility in Regenerative Dentistry, as surrogate therapeutic modules for conventional biomaterial-based approaches, offering regeneration of damaged oral tissues instead of simply “filling the gaps.” Thus, the essential next step to validate these immense advances is the implementation of well-designed clinical trials paving the way for exploiting these fascinating research achievements for patient well-being: the ultimate aim of this ground breaking technology. This review paper presents a concise overview of the major biological properties of the human dental MSCs, critical for the translational pathway “from bench to clinic.”

  7. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  8. Collaborative Negotiations: A Successful Approach for Negotiation Compliance Milestones for the transition of the PFP Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    HOPKINS, A.M.

    2003-01-01

    The new approach to negotiations was termed collaborative (win-win) rather than positional (win-lose). Collaborative negotiations were conducted to establish milestones for the decommissioning of the Plutonium Finishing Plant, PFP

  9. Failure to meet language milestones at two years of age is predictive of specific language impairment

    NARCIS (Netherlands)

    Diepeveen, F.B.; Dusseldorp, E.; Bol, G.W.; Oudesluys-Murphy, A.M.; Verkerk, P.H.

    2016-01-01

    This study established predictive properties of single language milestones for specific language impairment (SLI) after the age of four, as these had not previously been reported in the literature. Methods In this nested case-control study, children attending special needs schools for severe speech

  10. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  11. Pharmacological Treatment of Major Depressive Disorder in Adolescents

    Directory of Open Access Journals (Sweden)

    Rachel L. Farley

    2005-01-01

    Full Text Available Major depressive disorder (MDD affects a significant number of adolescents today. Its consequences (including social isolation, failure to achieve crucial developmental milestones, and suicide mandate close attention in clinical practice. While tricyclics and monoamine oxidase inhibitors (MAOIs have been used infrequently and with questionable efficacy, selective serotonin reuptake inhibitors (SSRIs, particularly fluoxetine, consistently have been shown to be of benefit in treating outpatient adolescents with MDD. Despite some success with other drugs in its class, fluoxetine remains the only SSRI that is FDA approved for treatment of children and adolescents with depression. A review of recent studies is presented, including the controversy regarding the relationship of antidepressants and suicidal behavior in this patient population.

  12. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  13. Relationship between cancer-related traumatic stress and family milestone achievement in adolescent and young adult survivors of childhood cancer.

    Science.gov (United States)

    Tillery, Rachel; Beal, Sarah J; Thompson, Aimee N; Pai, Ahna L H

    2018-06-01

    Late physical and emotional effects of cancer treatment pose a burden for adolescent and young adult survivors of childhood cancer, including family milestone achievement. This brief report examined links between ongoing cancer-related post-traumatic stress symptoms (CR-PTSS) and family milestone achievement. Survivors (n = 51; M age  = 24.73, SD = 8.20) completed CR-PTSS and family formation questionnaires. Descriptive statistics, univariate parameter-constraints, and correlation analyses examined relations among study variables. Ongoing intrusive thoughts and hyperarousal were negatively linked to family identity development and family achievement. Findings from the present study provide support that ongoing CR-PTSS may be a barrier to family formation. © 2018 Wiley Periodicals, Inc.

  14. A survey of resident perspectives on surgical case minimums and the impact on milestones, graduation, credentialing, and preparation for practice: AOA critical issues.

    Science.gov (United States)

    Jeray, Kyle J; Frick, Steven L

    2014-12-03

    Residency education continues to evolve. Several major changes have occurred in the past several years, including emphasis on core competencies, duty-hour restrictions, and call. The Accreditation Council for Graduate Medical Education (ACGME) Next Accreditation System (NAS) implemented educational milestones in orthopaedic surgery in July 2013. Additionally, the Residency Review Committee for orthopaedic surgery published suggested surgical case minimums in 2012, which overlap with several of the milestones.We conducted a survey to assess the opinions of orthopaedic residents regarding the ACGME-suggested surgical case minimums and the effects that these may have on resident education and potential future privileges in hospitals. The survey was sent via e-mail to all of the residents participating in the American Orthopaedic Association (AOA) Resident Leadership Forum for both 2011 and 2012. Participants in the Resident Leadership Forum are in either postgraduate year 4 or postgraduate year 5, are selected by the program directors as resident leaders, and represent 80% of the orthopaedic residency programs in the United States. The survey was completed by 157 of the 314 participants. Sixty-nine percent of the participants believed that case logs with minimum numbers of surgical procedures were an effective way to monitor the work but were not necessarily the only way to monitor the educational progress of the residents. Thirty-two percent believed that the minimums should not be required. Overwhelmingly, there was agreement that important cases were missing from the currently proposed sixteen core surgical minimums. Specifically, the residents believed that a minimum number of cases are necessary for distal radial fracture fixation and proximal humeral fracture fixation and possibly have a milestone to reflect the progress of the residents for each fixation.Most residents thought that surgical case minimums are an effective tool in monitoring the progress of

  15. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  16. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  17. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  18. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  20. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  1. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  2. Supply capability creation process: Key milestone criteria and activities

    Energy Technology Data Exchange (ETDEWEB)

    Verrollot, J.; Tolonen, A.; Harkonen, J.; Haapasalo, H.

    2017-07-01

    The article focuses on supply capability creation (SCC) within the new product development (NPD). The purpose is to establish an SCC process describing the main SCC activities and milestone criteria in preparing the supply process for new products Design/methodology/approach: The article analyses the earlier research, carries out current state analysis of six case companies regarding the SCC areas, and proposes a SCC process. Findings: The developed SCC process aims at preparing the operational supply capability for a developed new product based on the preferred, qualified and contracted suppliers and materials along the NPD process, and ultimately at the product ramp-up. Originality/value: This paper introduces a SCC process that has not been presented earlier in the literature, highlighting the important role of the SCC for successful product ramp-ups.

  3. Optimizing Fire Department Operations Through Work Schedule Analysis, Alternative Staffing, and Nonproductive Time Reduction

    Science.gov (United States)

    2014-09-01

    and disadvantages ; for example, although the majority of fire departments in the United States abide by the 24/48- schedule, this schedule also leads...costs. The local bargaining group also falls into these criteria. The local bargaining unit must be agreeable to the policy changes. They cannot... agreeable to the local bargaining group particularly when it is addressed in an article of the current bargaining agreement. Additionally, the local

  4. Cold vacuum drying facility site evaluation report

    International Nuclear Information System (INIS)

    Diebel, J.A.

    1996-01-01

    In order to transport Multi-Canister Overpacks to the Canister Storage Building they must first undergo the Cold Vacuum Drying process. This puts the design, construction and start-up of the Cold Vacuum Drying facility on the critical path of the K Basin fuel removal schedule. This schedule is driven by a Tri-Party Agreement (TPA) milestone requiring all of the spent nuclear fuel to be removed from the K Basins by December, 1999. This site evaluation is an integral part of the Cold Vacuum Drying design process and must be completed expeditiously in order to stay on track for meeting the milestone

  5. Important milestones for the LHC and for integrity

    CERN Document Server

    2015-01-01

    The major news this week is, of course, the start of LHC Run 2. Things went smoothly once the short circuit to ground in sector 3-4 had been resolved on 31 March, and by the time of the morning meeting at the CERN Control Centre on Easter Sunday, everything was ready to thread a beam around the machine. The meeting wrapped up at around 9.45, and by 10.41 the anticlockwise beam had made its first complete orbit. The clockwise beam completed its first turn at 12.27.   There was an atmosphere of excitement in the Control Centre that morning, and the smoothness of proceedings belied the fact that this was the first beam around the LHC for two years. Over that time, the LHC had been transformed, so there was nothing routine about the task in hand, and it’s a great credit to all that things went so well. The schedule now foresees a couple of months of careful commissioning with beam before the start of physics at 13 TeV at the end of May or in early June. It’s traditional to ma...

  6. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  7. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  8. Computing Rates of Small Molecule Diffusion Through Protein Channels Using Markovian Milestoning

    Science.gov (United States)

    Abrams, Cameron

    2014-03-01

    Measuring diffusion rates of ligands plays a key role in understanding the kinetic processes inside proteins. For example, although many molecular simulation studies have reported free energy barriers to infer rates for CO diffusion in myoglobin (Mb), they typically do not include direct calculation of diffusion rates because of the long simulation times needed to infer these rates with statistical accuracy. We show in this talk how to apply Markovian milestoning along minimum free-energy pathways to calculate diffusion rates of CO inside Mb. In Markovian milestoning, one partitions a suitable reaction coordinate space into regions and performs restrained molecular dynamics in each region to accumulate kinetic statistics that, when assembled across regions, provides an estimate of the mean first-passage time between states. The mean escape time for CO directly from the so-called distal pocket (DP) through the histidine gate (HG) is estimated at about 24 ns, confirming the importance of this portal for CO. But Mb is known to contain several internal cavities, and cavity-to-cavity diffusion rates are also computed and used to build a complete kinetic network as a Markov state model. Within this framework, the effective mean time of escape to the solvent through HG increases to 30 ns. Our results suggest that carrier protein structure may have evolved under pressure to modulate dissolved gas release rates using a network of ligand-accessible cavities. Support: NIH R01GM100472.

  9. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  10. Puberty: Maturation, Timing and Adjustment, and Sexual Identity Developmental Milestones among Lesbian, Gay, and Bisexual Youth

    Science.gov (United States)

    Grossman, Arnold H.; Foss, Alexander H.; D'Augelli, Anthony R.

    2014-01-01

    This study examined pubertal maturation, pubertal timing and outcomes, and the relationship of puberty and sexual identity developmental milestones among 507 lesbian, gay, and bisexual youth. The onset of menarche and spermarche occurred at the mean ages of 12.05 and 12.46, respectively. There was no statistically significant difference in…

  11. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  12. Targeted Feedback in the Milestones Era: Utilization of the Ask-Tell-Ask Feedback Model to Promote Reflection and Self-Assessment.

    Science.gov (United States)

    French, Judith C; Colbert, Colleen Y; Pien, Lily C; Dannefer, Elaine F; Taylor, Christine A

    2015-01-01

    The Accreditation Council for Graduate Medical Education's Milestones Project focuses trainee education on the formation of valued behaviors and skills believed to be necessary for trainees to become independent practitioners. The development and refinement of behaviors and skills outlined within the milestones will require learners to monitor, reflect, and assess their own performance over time. External feedback provides an opportunity for learners to recalibrate their self-assessments, thereby enabling them to develop better self-monitoring and self-assessment skills. Yet, feedback to trainees is frequently generic, such as "great job," "nice work," or "you need to read more." In this article, we describe a feedback model that faculty can use to provide specific feedback, while increasing accountability for learners. We offer practical examples of its use in a variety of settings in the milestone era. The Ask-Tell-Ask (ATA) patient communication skills strategy, which was adapted for use as a trainee feedback model 10 years ago at our institution, is a learner-centered approach for reinforcing and modifying behaviors. The model is efficient, promotes learner accountability, and helps trainees develop reflection and self-assessment skills. A feedback agreement further enhances ATA by establishing a shared understanding of goals for the educational encounter. The ATA feedback model, combined with a feedback agreement, encourages learners to self-identify strengths and areas for improvement, before receiving feedback. Personal monitoring, reflection, self-assessment, and increased accountability make ATA an ideal learner-centered feedback model for the milestones era, which focuses on performance improvement over time. We believe the introduction of the ATA feedback model in surgical training programs is a step in the right direction towards meaningful programmatic culture change. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  15. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    International Nuclear Information System (INIS)

    Appel, Gordon John

    2016-01-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  16. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  17. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  18. Quarterly report on program cost and schedule: Second quarter, FY 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report provides a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included is the status of the Nuclear Waste Fund revenues and disbursements. 19 figs

  19. Puberty, sexual milestones and abuse: how are they related in eating disorder patients?

    Science.gov (United States)

    Schmidt, U; Evans, K; Tiller, J; Treasure, J

    1995-03-01

    In order to assess the relationship pubertal development, sexual milestones and childhood sexual abuse in women with eating disorders, 44 patients with restricting anorexia nervosa (RAN), 26 with bulimic anorexia nervosa (BAN), 29 with bulimia nervosa and also with a history of anorexia nervosa (BN/HistAN), and 69 with bulimia nervosa but without a history of anorexia nervosa (BN) completed questionnaires on pubertal and sexual development and unpleasant sexual experiences. Forty-four female college students complete the sexual development questionnaire only. Different eating disorder groups were found to be similar in terms of their pubertal development. All eating disorder groups showed delays in aspects of their psychosexual development (age at first kiss, masturbation, genital fondling and first sexual intercourse) compared with the control group, although to a different degree. The RAN group was delayed on almost all sexual milestones whereas the other groups were delayed on only some. On some variables, most noticeably on first sexual intercourse, restricters also were more delayed than the other eating disorder groups. Similarly, the median number of sexual partners differed significantly between groups (RAN = 1, BAN = 2, BN/HistAN = 4, BN = 4, controls = 5, P masturbation, marriage, children or pregnancy. Of the eating disorder patients 22-31% had been sexually abused during childhood. A history of abuse affected attitudes to masturbation, but did not appear to affect sexual development.

  20. How do clinical competency committees use different sources of data to assess residents' performance on the internal medicine milestones?A mixed methods pilot study.

    Science.gov (United States)

    Ekpenyong, Andem; Baker, Elizabeth; Harris, Ilene; Tekian, Ara; Abrams, Richard; Reddy, Shalini; Park, Yoon Soo

    2017-10-01

    This study examines how Clinical Competency Committees (CCCs) synthesize assessment data to make judgments about residents' clinical performances. Between 2014 and 2015, after four six-month reporting periods to the Accreditation Council for Graduate Medical Education (ACGME), 7 of 16 CCC faculty at Rush University Medical Center completed questionnaires focused on their perspectives about rating residents on their achievement of the milestones and participated in a focus group. Qualitative data were analyzed using grounded theory. Milestones ratings for two six-month ACGME reporting cycles (n = 100 categorical residents) were also analyzed. CCC members weighted resident rotation ratings highest (weight = 37%), followed by faculty rotation comments (weight = 27%) and personal experience with residents (weight = 14%) for making judgments about learner's milestone levels. Three assessment issues were identified from qualitative analyses: (1) "design issues" (e.g. problems with available data or lack thereof); (2) "synthesis issues" (e.g. factors influencing ratings and decision-making processes) and (3) "impact issues" (e.g. how CCC generated milestones ratings are used). Identifying factors that affect assessment at all stages of the CCC process can contribute to improving assessment systems, including support for faculty development for CCCs. Recognizing challenges in synthesizing first and second-hand assessment data is an important step in understanding the CCC decision-making process.

  1. Supply capability creation process: Key milestone criteria and activities

    Directory of Open Access Journals (Sweden)

    Jordan Verrollot

    2017-09-01

    Full Text Available Purpose: The article focuses on supply capability creation (SCC within the new product development (NPD. The purpose is to establish an SCC process describing the main SCC activities and milestone criteria in preparing the supply process for new products Design/methodology/approach: The article analyses the earlier research, carries out current state analysis of six case companies regarding the SCC areas, and proposes a SCC process. Findings: The developed SCC process aims at preparing the operational supply capability for a developed new product based on the preferred, qualified and contracted suppliers and materials along the NPD process, and ultimately at the product ramp-up. Originality/value: This paper introduces a SCC process that has not been presented earlier in the literature, highlighting the important role of the SCC for successful product ramp-ups.

  2. Optimal trajectory planning and train scheduling for urban rail transit systems

    CERN Document Server

    Wang, Yihui; van den Boom, Ton; De Schutter, Bart

    2016-01-01

    This book contributes to making urban rail transport fast, punctual and energy-efficient –significant factors in the importance of public transportation systems to economic, environmental and social requirements at both municipal and national levels. It proposes new methods for shortening passenger travel times and for reducing energy consumption, addressing two major topics: (1) train trajectory planning: the authors derive a nonlinear model for the operation of trains and present several approaches for calculating optimal and energy-efficient trajectories within a given schedule; and (2) train scheduling: the authors develop a train scheduling model for urban rail systems and optimization approaches with which to balance total passenger travel time with energy efficiency and other costs to the operator. Mixed-integer linear programming and pseudospectral methods are among the new methods proposed for single- and multi-train systems for the solution of the nonlinear trajectory planning problem which involv...

  3. History of pancreaticoduodenectomy: early misconceptions, initial milestones and the pioneers.

    Science.gov (United States)

    Are, Chandrakanth; Dhir, Mashaal; Ravipati, Lavanya

    2011-06-01

    Pancreaticoduodenectomy is one of the most challenging surgical procedures which requires the highest level of surgical expertise. This procedure has constantly evolved over the years through the meticulous efforts of a number of surgeons before reaching its current state. This review navigates through some of the early limitations and misconceptions and highlights the initial milestones which laid the foundation of this procedure. The current review also provides a few excerpts from the lives and illuminates on some of the seminal contributions of the three great surgeons: William Stewart Halsted, Walther Carl Eduard Kausch and Allen Oldfather Whipple. These surgeons pioneered the nascent stages of this procedure and paved the way for the modern day pancreaticoduodenectomy. © 2011 International Hepato-Pancreato-Biliary Association.

  4. Maternal prepregnancy obesity and achievement of infant motor developmental milestones in the upstate KIDS study.

    Science.gov (United States)

    Wylie, Amanda; Sundaram, Rajeshwari; Kus, Christopher; Ghassabian, Akhgar; Yeung, Edwina H

    2015-04-01

    Maternal prepregnancy obesity is associated with several poor infant health outcomes; however, studies that investigated motor development have been inconsistent. Thus, maternal prepregnancy weight status and infants' gross motor development were examined. Participants consisted of 4,901 mother-infant pairs from the Upstate KIDS study, a longitudinal cohort in New York. Mothers indicated dates when infants achieved each of six gross motor milestones when infants were 4, 8, 12, 18, and 24 months old. Failure time modeling under a Weibull distribution was utilized to compare time to achievement across three levels of maternal prepregnancy BMI. Hazard ratios (HR) below one indicate a lower "risk" of achieving the milestone and translate to later achievement. Compared to infants born to thin and normal-weight mothers (BMI obesity (BMI > 30) were slower to sit without support (HR = 0.91, P = 0.03) and crawl on hands and knees (HR = 0.86, P obesity was associated with a slightly longer time for infant to sit and crawl, potentially due to a compromised intrauterine environment or reduced physically active play. © 2015 The Obesity Society.

  5. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  6. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  7. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  8. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions

    Science.gov (United States)

    Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven

    2011-01-01

    monitor the licensee’s diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind. This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH’s exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic

  9. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions.

    Science.gov (United States)

    Ponzio, Todd A; Feindt, Hans; Ferguson, Steven

    2011-09-01

    the licensee's diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind.This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH's exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark

  10. Contagious flexibility? A study on whether schedule flexibility facilitates work-life enrichment.

    Science.gov (United States)

    Pedersen, Vivi Bach; Jeppesen, Hans Jeppe

    2012-08-01

    Schedule flexibility defines an important generating resource for work-life enrichment; however, our knowledge about how such spillovers take place is limited. This multiple case study examines how workers from different working time contexts with varying levels of schedule flexibility experience work-life interplay. Given the adopted explorative design, it is important to interpret the findings in a tentative light. Nonetheless, the study offers important insight into work-life enrichment that may guide future research in this field. The findings indicate that schedule flexibility may act as a boundary-spanning resource owing to the agency potential it offers workers. Thus, it seemed that flexible schedule opportunities enabled workers to engage more fully in personal life activities, which in turn had a positive influence on their work involvement through positive affect. Such positive role engagements appeared, however, to be greatly determined by workers' boundary management and by time conditions of work and family. In conclusion, the major findings and limitation of the study are discussed against existing research and theory. © 2012 The Authors. Scandinavian Journal of Psychology © 2012 The Scandinavian Psychological Associations.

  11. Teaching the Healthcare Economics Milestones to Radiology Residents: Our Pilot Curriculum Experience.

    Science.gov (United States)

    Prober, Allen S; Mehan, William A; Bedi, Harprit S

    2016-07-01

    Since July 2013, the Accreditation Council for Graduate Medical Education (ACGME) has required radiology residency programs to implement a set of educational milestones to track residents' educational advancement in six core competencies, including Systems-based Practice. The healthcare economics subcompetency of Systems-based Practice has traditionally been relatively neglected, and given the new increased ACGME oversight, will specifically require greater focused attention. A multi-institutional health-care economics pilot curriculum combining didactic and practical components was implemented across five residency programs. The didactic portion included a package of online recorded presentations, reading, and testing materials developed by the American College of Radiology (ACR's) Radiology Leadership Institute. The practical component involved a series of local meetings led by program faculty with the production of a deliverable based on research of local reimbursement for a noncontrast head computed tomography. The capstone entailed the presentation of each program's deliverable during a live teleconference webcast with a Radiology Leadership Institute content expert acting as moderator and discussion leader. The pilot curriculum was well received by residents and faculty moderators, with 100% of survey respondents agreeing that the pilot met its objective of introducing how reimbursement works in American radiology in 2015 and how business terminology applies to their particular institutions. A health-care economics curriculum in the style of a Massive Open Online Course has strong potential to serve as many residency programs' method of choice in meeting the health-care economics milestones. Copyright © 2016 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.

  12. ORIGINAL ARTICLES

    African Journals Online (AJOL)

    limited. For mothers the weight-for-age chart, immunisation schedule and ... language. It should contain more information on health matters, adequate space to record weight and infectious diseases, an illustrated milestone chart and an improved . schedule for ..... The success of preschool health monitoring relies solely on.

  13. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  14. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  15. Free energy and scalings for polymer translocation through a nanopore: A molecular dynamics simulation study combined with milestoning

    International Nuclear Information System (INIS)

    Xue, Xiang-Gui; Zhao, Li; Lu, Zhong-Yuan; Li, Ze-Sheng

    2012-01-01

    Coarse-grained molecular dynamics simulations combined with milestoning method are used to study the stochastic process of polymer chain translocation though a nanopore. We find that the scalings for polymer translocation process (the chain is initialized with the first monomer in the nanopore) and for polymer escape process (the chain is initialized with the middle monomer in the nanopore) are different. The translocation process is mainly controlled by the entropic barrier, while the polymer escape process is driven by the effective force due to free energy difference. -- Highlights: ► We study polymer translocating through a nanopore by CGMD combined with milestoning. ► We find that the scalings for polymer translocation and for polymer escape are different. ► The translocation process is mainly controlled by the entropic barrier. ► The polymer escape process is driven by the effective force due to free energy difference.

  16. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  17. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  18. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  19. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  20. SPORT: An Algorithm for Divisible Load Scheduling with Result Collection on Heterogeneous Systems

    Science.gov (United States)

    Ghatpande, Abhay; Nakazato, Hidenori; Beaumont, Olivier; Watanabe, Hiroshi

    Divisible Load Theory (DLT) is an established mathematical framework to study Divisible Load Scheduling (DLS). However, traditional DLT does not address the scheduling of results back to source (i. e., result collection), nor does it comprehensively deal with system heterogeneity. In this paper, the DLSRCHETS (DLS with Result Collection on HET-erogeneous Systems) problem is addressed. The few papers to date that have dealt with DLSRCHETS, proposed simplistic LIFO (Last In, First Out) and FIFO (First In, First Out) type of schedules as solutions to DLSRCHETS. In this paper, a new polynomial time heuristic algorithm, SPORT (System Parameters based Optimized Result Transfer), is proposed as a solution to the DLSRCHETS problem. With the help of simulations, it is proved that the performance of SPORT is significantly better than existing algorithms. The other major contributions of this paper include, for the first time ever, (a) the derivation of the condition to identify the presence of idle time in a FIFO schedule for two processors, (b) the identification of the limiting condition for the optimality of FIFO and LIFO schedules for two processors, and (c) the introduction of the concept of equivalent processor in DLS for heterogeneous systems with result collection.

  1. ITER final design report, cost review and safety analysis (FDR) and relevant documents

    International Nuclear Information System (INIS)

    1999-01-01

    This volume contains the fourth major milestone report and documents associated with its acceptance, review and approval. This ITER Final Design Report, Cost Review and Safety Analysis was presented to the ITER Council at its 13th meeting in February 1998 and was approved at its extraordinary meeting on 25 June 1998. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics and schedule and cost estimates are given

  2. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  3. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  4. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  5. Some Major Issues Influencing Nuclear Energy Prospective

    International Nuclear Information System (INIS)

    Feretic, D.

    2012-01-01

    The presentation analyses some issues which are of particular importance for future nuclear power application. These include duration of uranium reserves and high level radioactive waste decay period in function of uranium reserves (determined, assumed and speculative) and type of fuel cycle used. Public acceptance during essential historical milestones of nuclear power use, influence of safety and compatibility evaluations, quantified risk, externalities and nuclear accidents. Short review of major accidents, causes, consequences, impact of LNT and hormesis hypothesis. Particular problem for future of nuclear power is potential shortage of experienced personnel due to long period without plants construction. To address some of problems which may face future investors a brief review of specific events experienced during construction of NPP Krsko is presented. Such events could be of interest to countries planning to construct nuclear power plant.(author).

  6. Where do we go from here? Moving from systems-based practice process measures to true competency via developmental milestones

    Directory of Open Access Journals (Sweden)

    Johanna Martinez

    2014-06-01

    Full Text Available For many educators it has been challenging to meet the Accreditation Council for Graduate Medical Education's requirements for teaching systems-based practice (SBP. An additional layer of complexity for educators is evaluating competency in SBP, despite milestones and entrustable professional activities (EPAs. In order to address this challenge, the authors present the results of a literature review for how SBP is currently being taught and a series of recommendations on how to achieve competency in SBP for graduate medical trainees with the use of milestones. The literature review included 29 articles and demonstrated that only 28% of the articles taught more than one of the six core principles of SBP in a meaningful way. Only 7% of the articles received the highest grade of A. The authors summarize four guiding principles for creating a competency-based curriculum that is in alignment with the Next Accreditation System (NAS: 1 the curriculum needs to include all of the core principles in that competency, 2 the objectives of the curriculum should be driven by clinical outcomes, 3 the teaching modalities need to be interactive and clinically relevant, and 4 the evaluation process should be able to measure competency and be directly reflective of pertinent milestones and/or EPAs. This literature review and the provided guiding principles can guide other residency educators in their development of competency-based curricula that meets the standards of the NAS.

  7. Avoiding Biased-Feeding in the Scheduling of Collaborative Multipath TCP.

    Directory of Open Access Journals (Sweden)

    Meng-Hsun Tsai

    Full Text Available Smartphones have become the major communication and portable computing devices that access the Internet through Wi-Fi or mobile networks. Unfortunately, users without a mobile data subscription can only access the Internet at limited locations, such as hotspots. In this paper, we propose a collaborative bandwidth sharing protocol (CBSP built on top of MultiPath TCP (MPTCP. CBSP enables users to buy bandwidth on demand from neighbors (called Helpers and uses virtual interfaces to bind the subflows of MPTCP to avoid modifying the implementation of MPTCP. However, although MPTCP provides the required multi-homing functionality for bandwidth sharing, the current packet scheduling in collaborative MPTCP (e.g., Co-MPTCP leads to the so-called biased-feeding problem. In this problem, the fastest link might always be selected to send packets whenever it has available cwnd, which results in other links not being fully utilized. In this work, we set out to design an algorithm, called Scheduled Window-based Transmission Control (SWTC, to improve the performance of packet scheduling in MPTCP, and we perform extensive simulations to evaluate its performance.

  8. Avoiding Biased-Feeding in the Scheduling of Collaborative Multipath TCP.

    Science.gov (United States)

    Tsai, Meng-Hsun; Chou, Chien-Ming; Lan, Kun-Chan

    2016-01-01

    Smartphones have become the major communication and portable computing devices that access the Internet through Wi-Fi or mobile networks. Unfortunately, users without a mobile data subscription can only access the Internet at limited locations, such as hotspots. In this paper, we propose a collaborative bandwidth sharing protocol (CBSP) built on top of MultiPath TCP (MPTCP). CBSP enables users to buy bandwidth on demand from neighbors (called Helpers) and uses virtual interfaces to bind the subflows of MPTCP to avoid modifying the implementation of MPTCP. However, although MPTCP provides the required multi-homing functionality for bandwidth sharing, the current packet scheduling in collaborative MPTCP (e.g., Co-MPTCP) leads to the so-called biased-feeding problem. In this problem, the fastest link might always be selected to send packets whenever it has available cwnd, which results in other links not being fully utilized. In this work, we set out to design an algorithm, called Scheduled Window-based Transmission Control (SWTC), to improve the performance of packet scheduling in MPTCP, and we perform extensive simulations to evaluate its performance.

  9. Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques

    Science.gov (United States)

    Stottler, D.

    There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.

  10. The Mixed Waste Management Facility monthly report, April 1995

    International Nuclear Information System (INIS)

    Streit, R.D.

    1995-05-01

    During late April, we modified the budget and work plan for FY95 to reflect a $2000K funding reduction for this fiscal year. These changes incorporate both the delayed start and slow ramp-up due to DOE funding uncertainties, as well as new and real reductions in Project activities. Due to the significant budgeting impact, this report reflects the resulting budget changes (for April). Scope and schedule impact, however, will be documented in the May report due to the additional effort involved in assessing schedule impact. We will combine the May Monthly Report and the Revised FY95 Plan for cost efficiency; we will submit the FY95 Plan Rebaseline for approval by DOE in May. Technical progress continued during April, but was redirected toward the new FY95 Plan. Key changes in the revised plan are to delete MEO from Project scope and wrap up work to date, defer further major procurements for the Project from FY95, delete MSO staff additions (with milestones), and defer work and milestones in other WBS elements. Engineering development, preliminary design, and peer reviews continued in preparation for the Project Preliminary Design Review. The budget reduction is executed to delay the Project Preliminary Design Review until Ql of FY96

  11. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  12. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  13. Assessment of major nuclear technologies with decision and risk analysis

    International Nuclear Information System (INIS)

    Winterfeldt, D. von

    1995-01-01

    Selecting technologies for major nuclear programs involves several complexities, including multiple stakeholders, multiple conflicting objectives, uncertainties, and risk. In addition, the programmatic risks related to the schedule, cost, and performance of these technologies often become major issues in the selection process. This paper describes a decision analysis approach for addressing these complexities in a logical manner

  14. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  15. Workforce scheduling: A new model incorporating human factors

    Directory of Open Access Journals (Sweden)

    Mohammed Othman

    2012-12-01

    Full Text Available Purpose: The majority of a company’s improvement comes when the right workers with the right skills, behaviors and capacities are deployed appropriately throughout a company. This paper considers a workforce scheduling model including human aspects such as skills, training, workers’ personalities, workers’ breaks and workers’ fatigue and recovery levels. This model helps to minimize the hiring, firing, training and overtime costs, minimize the number of fired workers with high performance, minimize the break time and minimize the average worker’s fatigue level.Design/methodology/approach: To achieve this objective, a multi objective mixed integer programming model is developed to determine the amount of hiring, firing, training and overtime for each worker type.Findings: The results indicate that the worker differences should be considered in workforce scheduling to generate realistic plans with minimum costs. This paper also investigates the effects of human fatigue and recovery on the performance of the production systems.Research limitations/implications: In this research, there are some assumptions that might affect the accuracy of the model such as the assumption of certainty of the demand in each period, and the linearity function of Fatigue accumulation and recovery curves. These assumptions can be relaxed in future work.Originality/value: In this research, a new model for integrating workers’ differences with workforce scheduling is proposed. To the authors' knowledge, it is the first time to study the effects of different important human factors such as human personality, skills and fatigue and recovery in the workforce scheduling process. This research shows that considering both technical and human factors together can reduce the costs in manufacturing systems and ensure the safety of the workers.

  16. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  17. Maternal pre-pregnancy obesity and achievement of infant motor developmental milestones in the Upstate KIDS Study

    Science.gov (United States)

    Wylie, Amanda; Sundaram, Rajeshwari; Kus, Christopher; Ghassabian, Akhgar; Yeung, Edwina H.

    2015-01-01

    Objective Maternal pre-pregnancy obesity is associated with several poor infant health outcomes; however studies that investigated motor development have been inconsistent. Thus, we examined maternal pre-pregnancy weight status and infants’ gross motor development. Design and Methods Participants consisted of 4,901 mother-infant pairs from the Upstate KIDS study, a longitudinal cohort in New York. Mothers indicated dates when infants achieved each of six gross motor milestones when infants were 4, 8, 12, 18, and 24 months old. Failure time modeling under a Weibull distribution was utilized to compare time to achievement across three levels of maternal pre-pregnancy BMI. Hazard ratios below one indicate a lower “risk” of achieving the milestone and translate to later achievement. Results Compared to infants born to thin and normal weight mothers (BMI obese mothers (BMI>30) were slower to sit without support [HR=0.91, p=0.03] and crawl on hands and knees [HR=0.86, pobesity was associated with a slightly longer time for infant to sit and crawl, potentially due to a compromised intrauterine environment or reduced physically active play. PMID:25755075

  18. 20 CFR 411.597 - Will SSA periodically review the outcome payment system and the outcome-milestone payment system...

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Will SSA periodically review the outcome payment system and the outcome-milestone payment system for possible modifications? 411.597 Section 411... Employment Network Payment Systems § 411.597 Will SSA periodically review the outcome payment system and the...

  19. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  20. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  1. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  2. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  3. Development of ATC Tower Systems: Electronic Flight Strip System at LKPR and the Implementation of TAXI Milestone to SUM

    Directory of Open Access Journals (Sweden)

    Pavel Černý

    2016-10-01

    Full Text Available This article describes the Electronic Flight Strip System used at Václav Havel Airport Prague and presents the results of an analysis of the clearance input from ATCOs. The outcomes indicate that various clearances are frequently issued together in a common time frame, usually depending on the traffic flow structure. The focus then moves towards the implementation of the TAXI milestone into the Start-Up Manager. The used statistic methods indicate that the amount of TTOT recalculations after AOBT decreases, but not significantly. However, the accuracy of TTOT after TAXI clearance is considerably better. The mean and most common deviation of ATOT from TTOT after the implementation of TAXI milestone is -1 minute. The results are challenged and confirmed by a further analysis of the TTOT-ATOT difference regarding individual stand/RWY pairs. The results may be used to adjust the assumed taxi times.

  4. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  5. Optimization of operating schedule of machines in granite industry using evolutionary algorithms

    International Nuclear Information System (INIS)

    Loganthurai, P.; Rajasekaran, V.; Gnanambal, K.

    2014-01-01

    Highlights: • Operating time of machines in granite industries was studied. • Operating time has been optimized using evolutionary algorithms such as PSO, DE. • The maximum demand has been reduced. • Hence the electricity cost of the industry and feeder stress have been reduced. - Abstract: Electrical energy consumption cost plays an important role in the production cost of any industry. The electrical energy consumption cost is calculated as two part tariff, the first part is maximum demand cost and the second part is energy consumption cost or unit cost (kW h). The maximum demand cost can be reduced without affecting the production. This paper focuses on the reduction of maximum demand by proper operating schedule of major equipments. For this analysis, various granite industries are considered. The major equipments in granite industries are cutting machine, polishing machine and compressor. To reduce the maximum demand, the operating time of polishing machine is rescheduled by optimization techniques such as Differential Evolution (DE) and particle swarm optimization (PSO). The maximum demand costs are calculated before and after rescheduling. The results show that if the machines are optimally operated, the cost is reduced. Both DE and PSO algorithms reduce the maximum demand cost at the same rate for all the granite industries. However, the optimum scheduling obtained by DE reduces the feeder power flow than the PSO scheduling

  6. Meeting the milestones. Strategies for including high-value care education in pulmonary and critical care fellowship training.

    Science.gov (United States)

    Courtright, Katherine R; Weinberger, Steven E; Wagner, Jason

    2015-04-01

    Physician decision making is partially responsible for the roughly 30% of U.S. healthcare expenditures that are wasted annually on low-value care. In response to both the widespread public demand for higher-quality care and the cost crisis, payers are transitioning toward value-based payment models whereby physicians are rewarded for high-value, cost-conscious care. Furthermore, to target physicians in training to practice with cost awareness, the Accreditation Council for Graduate Medical Education has created both individual objective milestones and institutional requirements to incorporate quality improvement and cost awareness into fellowship training. Subsequently, some professional medical societies have initiated high-value care educational campaigns, but the overwhelming majority target either medical students or residents in training. Currently, there are few resources available to help guide subspecialty fellowship programs to successfully design durable high-value care curricula. The resource-intensive nature of pulmonary and critical care medicine offers unique opportunities for the specialty to lead in modeling and teaching high-value care. To ensure that fellows graduate with the capability to practice high-value care, we recommend that fellowship programs focus on four major educational domains. These include fostering a value-based culture, providing a robust didactic experience, engaging trainees in process improvement projects, and encouraging scholarship. In doing so, pulmonary and critical care educators can strive to train future physicians who are prepared to provide care that is both high quality and informed by cost awareness.

  7. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  8. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  9. Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

    International Nuclear Information System (INIS)

    DEFIGH PRICE, C.

    2000-01-01

    Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and technical data. The report also includes discussion of demonstrations conducted and recommendations for additional testing. Tri-Party Agreement Milestones M-45-08A and M-45-08B required design and demonstration of LDMM systems for initial retrieval of SST waste. These specific milestones have recently been deleted as part of the M-45-00A change package. Future LDMM development work has been incorporated into specific technology demonstration milestones and SST waste retrieval milestones in the M-45-03 and M-45-05 milestone series

  10. Feasibility of a shorter Goal Attainment Scaling method for a pediatric spasticity clinic - The 3-milestones GAS.

    Science.gov (United States)

    Krasny-Pacini, A; Pauly, F; Hiebel, J; Godon, S; Isner-Horobeti, M-E; Chevignard, M

    2017-07-01

    Goal Attainment Scaling (GAS) is a method for writing personalized evaluation scales to quantify progress toward defined goals. It is useful in rehabilitation but is hampered by the experience required to adequately "predict" the possible outcomes relating to a particular goal before treatment and the time needed to describe all 5 levels of the scale. Here we aimed to investigate the feasibility of using GAS in a clinical setting of a pediatric spasticity clinic with a shorter method, the "3-milestones" GAS (goal setting with 3 levels and goal rating with the classical 5 levels). Secondary aims were to (1) analyze the types of goals children's therapists set for botulinum toxin treatment and (2) compare the score distribution (and therefore the ability to predict outcome) by goal type. Therapists were trained in GAS writing and prepared GAS scales in the regional spasticity-management clinic they attended with their patients and families. The study included all GAS scales written during a 2-year period. GAS score distribution across the 5 GAS levels was examined to assess whether the therapist could reliably predict outcome and whether the 3-milestones GAS yielded similar distributions as the original GAS method. In total, 541 GAS scales were written and showed the expected score distribution. Most scales (55%) referred to movement quality goals and fewer (29%) to family goals and activity domains. The 3-milestones GAS method was feasible within the time constraints of the spasticity clinic and could be used by local therapists in cooperation with the hospital team. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  11. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  12. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  13. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  14. Quarterly report on program cost and schedule: First quarter FY 1989

    International Nuclear Information System (INIS)

    1989-01-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes performance data through December 1988

  15. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  16. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  17. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  18. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  19. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  20. Refinery production planning and scheduling: the refining core business

    Directory of Open Access Journals (Sweden)

    M. Joly

    2012-06-01

    Full Text Available Intelligent production planning and scheduling are of paramount importance to ensure refinery profitability, logistic reliability and safety at the local and corporate levels. In Brazil, such activities play a particularly critical role, since the Brazilian downstream model is moving towards a demand-driven model rather than a supply-driven one. Moreover, new and specialized non-linear constraints are continuously being incorporated into these large-scale problems: increases in oil prices implying the need for processing poor quality crudes, increasing demand and new demand patterns for petroleum products, new stringent environmental regulations related to clean fuels and start-up of new production technologies embedded into more complex refining schemes. This paper aims at clarifying the central role of refinery planning and scheduling activities in the Petrobras refining business. Major past and present results are outlined and corporate long-term strategies to deal with present and future challenges are presented.

  1. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  2. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  3. Increasing the reliability of production schedules in a pharmaceutical packaging department.

    Science.gov (United States)

    Pacciarelli, Dario; D'Ariano, Andrea

    2012-12-01

    This paper studies quantitative methods for evaluating the potential benefits of introducing new advanced tracking technologies in the pharmaceutical industry with special reference to radio frequency identification (RFID). RFID technology is an effective way for increasing the quality of the data that are used to generate production schedules, but there is a lack of scientific research to quantify the return on investment that can be achieved in practice. In this work, we distinguish two major sources of data unreliability: one is the inherent stochasticity of operations, which cannot be reduced by RFID, and the other one is the data estimation error, which can be significantly reduced by RFID. We focus on the marginal contribution of the latter quantity to the productivity of the packaging department of a pharmaceutical plant, propose a systematic method for assessing this impact and discuss its implementation in a practical test case. Our results confirm that advanced tracking technologies in combination with effective scheduling procedures show a significant potential for improving productivity. Extensions to other production environments and their issues associated with scheduling problems are also discussed.

  4. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  5. 1998 Annual Report - Environmental Restoration Division

    International Nuclear Information System (INIS)

    Davis, L.B.

    1998-01-01

    This is a 1998 annual report for Environmental Restoration. Environmental Restoration's accomplishments were significant in 1998. The division, including its support organizations, completed one year without a lost time accident. It also met 111 enforceable agreement milestones on time, with more than 80% ahead of schedule. Funds used to meet these milestones were effectively utilized and $9.63 million in regulatory scope was added. Twelve new, innovative technologies were deployed, enabling ER to achieve significant progress on major field remediation projects, including: Remediation of 25 acres of radioactive burial ground; Removal of 1,300 batteries for recycling; Removal and safe storage of a radioactive underground tank; Extraction of 115,000 pounds of solvent; and Installation of 9 new recirculation wells and a second GeoSiphon Cell for additional removal of solvent Final Records of Decision were made for 9 base unit sites. No Further Action decisions were made for 61 additional sites

  6. Uniting Evidence-Based Evaluation with the ACGME Plastic Surgery Milestones: A Simple and Reliable Assessment of Resident Operative Performance.

    Science.gov (United States)

    Kobraei, Edward M; Bohnen, Jordan D; George, Brian C; Mullen, John T; Lillemoe, Keith D; Austen, William G; Liao, Eric C

    2016-08-01

    Milestones evaluations in plastic surgery reflect a shift toward competency-based training but have created a number of challenges. The authors have incorporated the smartphone application evaluation tool, System for Improving and Measuring Procedural Learning (SIMPL), that was recently developed by a multi-institutional research collaborative. In this pilot study, the authors hypothesize that SIMPL can improve resident evaluation and also collect granular performance data to simplify compliance with the plastic surgery Milestones. SIMPL was prospectively piloted with a plastic surgery resident and faculty surgeon at Massachusetts General Hospital in this institutional review board-approved study. The study period was a 2-month interval corresponding to the resident's rotation. The resident-faculty combination performed 20 cases together. All cases were evaluated with SIMPL. SIMPL evaluations uniformly took under 1 minute to submit. The average time to completed evaluation from surgery completion was 5 hours (technology will support a shared vocabulary between residents and faculty to enhance intraoperative education.

  7. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  8. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  9. US central station nuclear electric generating units: significant milestones

    International Nuclear Information System (INIS)

    1979-09-01

    Listings of US nuclear power plants include significant dates, reactor type, owners, and net generating capacity. Listings are made by state, region, and utility. Tabulations of status, schedules, and orders are also presented

  10. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  11. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  12. Summary of FY 17 Assessments Sandia National Laboratories: Evaluation of FY16 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John

    2017-03-01

    This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.

  13. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  14. Prenatal smoking exposure, measured as maternal serum cotinine, and children's motor developmental milestones and motor function: a follow-up study

    DEFF Research Database (Denmark)

    Christensen, Line Høgenhof; Bjerre Høyer, Birgit; Pedersen, Henning Sloth

    2016-01-01

    and duration of breastfeeding. Data were stratified by country.ResultsNo statistically significant difference in age at motor milestones was found comparing children of smokers with children of non-smokers. Also, there was no statistically significant difference in motor score (Developmental Coordination...

  15. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  16. ASC Tri-lab Co-design Level 2 Milestone Report 2015

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, Rich [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, Holger [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Keasler, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Neely, Rob [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pearce, Olga [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hammond, Si [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Trott, Christian [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lin, Paul [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Vaughan, Courtenay [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Cook, Jeanine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hoekstra, Rob [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bergen, Ben [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Payne, Josh [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Womeldorff, Geoff [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-09-23

    In 2015, the three Department of Energy (DOE) National Laboratories that make up the Advanced Sci- enti c Computing (ASC) Program (Sandia, Lawrence Livermore, and Los Alamos) collaboratively explored performance portability programming environments in the context of several ASC co-design proxy applica- tions as part of a tri-lab L2 milestone executed by the co-design teams at each laboratory. The programming environments that were studied included Kokkos (developed at Sandia), RAJA (LLNL), and Legion (Stan- ford University). The proxy apps studied included: miniAero, LULESH, CoMD, Kripke, and SNAP. These programming models and proxy-apps are described herein. Each lab focused on a particular combination of abstractions and proxy apps, with the goal of assessing performance portability using those. Performance portability was determined by: a) the ability to run a single application source code on multiple advanced architectures, b) comparing runtime performance between \

  17. Level 4 Milestone (M4): M41UF033201 - Review of Radiolysis of Brines on the Surface of a Waste Package

    Energy Technology Data Exchange (ETDEWEB)

    Sutton, Mark [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-08-12

    This milestone report (M41UF033201) documents a literature review of relevant publications for gamma radiolysis occurring within a droplet of water on the outside of a waste package in a repository environment within the “

  18. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  19. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  20. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    Science.gov (United States)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  1. ASC Trilab L2 Codesign Milestone 2015

    Energy Technology Data Exchange (ETDEWEB)

    Trott, Christian Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hammond, Simon David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dinge, Dennis [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lin, Paul T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Vaughan, Courtenay T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Cook, Jeanine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Edwards, Harold C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rajan, Mahesh [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hoekstra, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    For the FY15 ASC L2 Trilab Codesign milestone Sandia National Laboratories performed two main studies. The first study investigated three topics (performance, cross-platform portability and programmer productivity) when using OpenMP directives and the RAJA and Kokkos programming models available from LLNL and SNL respectively. The focus of this first study was the LULESH mini-application developed and maintained by LLNL. In the coming sections of the report the reader will find performance comparisons (and a demonstration of portability) for a variety of mini-application implementations produced during this study with varying levels of optimization. Of note is that the implementations utilized including optimizations across a number of programming models to help ensure claims that Kokkos can provide native-class application performance are valid. The second study performed during FY15 is a performance assessment of the MiniAero mini-application developed by Sandia. This mini-application was developed by the SIERRA Thermal-Fluid team at Sandia for the purposes of learning the Kokkos programming model and so is available in only a single implementation. For this report we studied its performance and scaling on a number of machines with the intent of providing insight into potential performance issues that may be experienced when similar algorithms are deployed on the forthcoming Trinity ASC ATS platform.

  2. Project Milestone. Analysis of Range Extension Techniques for Battery Electric Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2013-07-01

    This report documents completion of the July 2013 milestone as part of NREL’s Vehicle Technologies Annual Operating Plan with the U.S. Department of Energy. The objective was to perform analysis on range extension techniques for battery electric vehicles (BEVs). This work represents a significant advancement over previous thru-life BEV analyses using NREL’s Battery Ownership Model, FastSim,* and DRIVE.* Herein, the ability of different charging infrastructure to increase achievable travel of BEVs in response to real-world, year-long travel histories is assessed. Effects of battery and cabin thermal response to local climate, battery degradation, and vehicle auxiliary loads are captured. The results reveal the conditions under which different public infrastructure options are most effective, and encourage continued study of fast charging and electric roadway scenarios.

  3. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  4. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  5. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  6. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  7. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  8. Surplus Highly Enriched Uranium Disposition Program plan

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements

  9. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  10. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  11. Schedule and cost reduction of nuclear generating facilities in Ontario study overview

    International Nuclear Information System (INIS)

    Huterer, J.

    1991-01-01

    During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan

  12. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  13. History of heat pumps - Swiss contributions and international milestones

    Energy Technology Data Exchange (ETDEWEB)

    Zogg, M

    2008-05-15

    Compared to conventional boilers, heating by heat pumps cuts down fuel consumption and CO{sub 2} emissions to about 50%. Compared to electric resistance heating, the energy consumption is even reduced up to 80%. Therefore, the impressive market penetration growth of heat pumps will continue. Swiss pioneers were the first to realize functioning vapour recompression plants. The first European heat pumps were realized in Switzerland. To date it remains one of the heat pump champions. Swiss pioneering work in the development of borehole heat exchangers, sewage heat recovery, oil free piston compressors and turbo compressors is well known. The biggest heat pump ever built comes from Switzerland. Although there is a fairly comprehensive natural gas distribution grid, 75% of the new single-family homes built in Switzerland are currently heated by heat pumps. This paper presents some of the highlights of this success story focusing on Swiss developments and relating them to the international milestones. In order to indicate the direction in which the future development might go to, some recent Swiss research projects are presented as well. (author)

  14. Operational Excellence through Schedule Optimization and Production Simulation of Application Specific Integrated Circuits.

    Energy Technology Data Exchange (ETDEWEB)

    Flory, John Andrew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Padilla, Denise D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gauthier, John H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Zwerneman, April Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Miller, Steven P [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performance evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.

  15. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  16. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  17. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  18. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  19. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  20. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  1. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  2. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  3. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  4. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  5. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  6. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  7. Final Review of FY17 ASC CSSE L2 Milestone #6018 entitled "Analyzing Power Usage Characteristics of Workloads Running on Trinity".

    Energy Technology Data Exchange (ETDEWEB)

    Hoekstra, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hammond, Simon David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hemmert, Karl Scott [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gentile, Ann C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Oldfield, Ron A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lang, Mike [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Martin, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    The presentation documented the technical approach of the team and summary of the results with sufficient detail to demonstrate both the value and the completion of the milestone. A separate SAND report was also generated with more detail to supplement the presentation.

  8. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  9. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  10. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  11. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  12. A Method of Flow-Shop Re-Scheduling Dealing with Variation of Productive Capacity

    Directory of Open Access Journals (Sweden)

    Kenzo KURIHARA

    2005-02-01

    Full Text Available We can make optimum scheduling results using various methods that are proposed by many researchers. However, it is very difficult to process the works on time without delaying the schedule. There are two major causes that disturb the planned optimum schedules; they are (1the variation of productive capacity, and (2the variation of products' quantities themselves. In this paper, we deal with the former variation, or productive capacities, at flow-shop works. When production machines in a shop go out of order at flow-shops, we cannot continue to operate the productions and we have to stop the production line. To the contrary, we can continue to operate the shops even if some workers absent themselves. Of course, in this case, the production capacities become lower, because workers need to move from a machine to another to overcome the shortage of workers and some shops cannot be operated because of the worker shortage. We developed a new re-scheduling method based on Branch-and Bound method. We proposed an equation for calculating the lower bound for our Branch-and Bound method in a practical time. Some evaluation experiments are done using practical data of real flow-shop works. We compared our results with those of another simple scheduling method, and we confirmed the total production time of our result is shorter than that of another method by 4%.

  13. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  14. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  15. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  16. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  17. Standards development: status summary report. Quarterly report, April-June 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report gives in summary form, the current schedule plans for development of regulations, guides, reports, petitions and environmental statements. Approved schedules are identified by a T (Target) date below each milestone description on the computerized network. Schedule estimates that have not yet been approved by standards development management are also included and are identified by an E (estimated) date below the approved target date. E dates do not represent approved changes and are printed for information purposes only

  18. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  19. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  20. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  1. FY17 CSSE L2 Milestone Report: Analyzing Power Usage Characteristics of Workloads Running on Trinity.

    Energy Technology Data Exchange (ETDEWEB)

    Pedretti, Kevin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    This report summarizes the work performed as part of a FY17 CSSE L2 milestone to in- vestigate the power usage behavior of ASC workloads running on the ATS-1 Trinity plat- form. Techniques were developed to instrument application code regions of interest using the Power API together with the Kokkos profiling interface and Caliper annotation library. Experiments were performed to understand the power usage behavior of mini-applications and the SNL/ATDM SPARC application running on ATS-1 Trinity Haswell and Knights Landing compute nodes. A taxonomy of power measurement approaches was identified and presented, providing a guide for application developers to follow. Controlled scaling study experiments were performed on up to 2048 nodes of Trinity along with smaller scale ex- periments on Trinity testbed systems. Additionally, power and energy system monitoring information from Trinity was collected and archived for post analysis of "in-the-wild" work- loads. Results were analyzed to assess the sensitivity of the workloads to ATS-1 compute node type (Haswell vs. Knights Landing), CPU frequency control, node-level power capping control, OpenMP configuration, Knights Landing on-package memory configuration, and algorithm/solver configuration. Overall, this milestone lays groundwork for addressing the long-term goal of determining how to best use and operate future ASC platforms to achieve the greatest benefit subject to a constrained power budget.

  2. Dynamic Airline Scheduling: An Analysis of the Potentials of Refleeting and Retiming

    DEFF Research Database (Denmark)

    Warburg, Valdemar; Hansen, Troels G.; Larsen, Allan

    2008-01-01

    We present a Dynamic Airline Scheduling (DAS) technique which is able to change departure times and reassign aircraft types during the booking process to meet fluctuating passenger demands. The procedure is tested on several different days before departure, resulting in a significant profit...... increase for a major European airline. The results also indicate that applying DAS close to departure yields the largest potential....

  3. Dynamic Airline Scheduling: An Analysis of the Potentials of Refleeting and Retiming

    DEFF Research Database (Denmark)

    Warburg, Valdemar; Hansen, Troels G.; Larsen, Allan

    We present a Dynamic Airline Scheduling (DAS) technique which is able to change departure times and reassign aircraft types during the booking process to meet fluctuating passenger demands. The procedure is tested on several different days before departure, resulting in a significant profit...... increase for a major European airline. The results also indicate that applying DAS close to departure yields the largest potential....

  4. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  5. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  6. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  7. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  8. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  9. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  10. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  11. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  12. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  13. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  14. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  15. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  16. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  17. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  18. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  1. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  2. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  3. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  4. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  5. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  6. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  7. Evaluating the marginal utility principle for long-term hydropower scheduling

    International Nuclear Information System (INIS)

    Zhao, Tongtiegang; Zhao, Jianshi; Liu, Pan; Lei, Xiaohui

    2015-01-01

    Highlights: • Analysis of one-, two- and multi-period hydropower scheduling. • Derivation of marginal cost and marginal return of carry-over storage. • Evaluation of the marginal utility principle in a case study of the Three Gorges Reservoir. - Abstract: The conversion of the potential energy of dammed water into hydropower depends on both reservoir storage and release, which are the major difficulties in hydropower reservoir operation. This study evaluates the marginal utility principle, which determines the optimal carry-over storage between periods, for long-term hydropower scheduling. Increasing marginal cost and decreasing marginal return are two important characteristics that determine the marginal utility principle in water supply. However, the notion of decreasing marginal return is inapplicable in hydropower scheduling. Instead, the carry-over storage from one period has an increasing marginal contribution to the power generation in the next period. Although carry-over storage incurs an increasing marginal cost to the power generation in the current period, the marginal return is higher than the marginal cost. The marginal return from the carry-over storage further increases in the multi-period case. These findings suggest saving as much carry-over storage as possible, which is bounded by the operational constraints of storage capacity, environmental flow, and installed capacity in actual hydropower scheduling. The marginal utility principle is evaluated for a case study of the Three Gorges Reservoir, and the effects of the constraints are discussed. Results confirm the theoretical findings and show that the marginal return from carry-over storage is larger than the marginal cost. The operational constraints help determine the optimal carry-over storage.

  8. Remote Handled TRU Waste Status and Activities and Challenges at the Hanford Site

    International Nuclear Information System (INIS)

    MCKENNEY, D.E.

    2000-01-01

    A significant portion of the Department of Energy's forecast volume of remote-handled (RH) transuranic (TRU) waste will originate from the Hanford Site. The forecasted Hanford RH-TRU waste volume of over 2000 cubic meters may constitute over one-third of the forecast inventory of RH-TRU destined for disposal at the Waste Isolation Pilot Plant (WIPP). To date, the Hanford TRU waste program has focused on the retrieval, treatment and certification of the contact-handled transuranic (CH-TRU) wastes. This near-term focus on CH-TRU is consistent with the National TRU Program plans and capabilities. The first shipment of CH-TRU waste from Hanford to the WIPP is scheduled early in Calendar Year 2000. Shipments of RH-TRU from Hanford to the WIPP are scheduled to begin in Fiscal Year 2006 per the National TRU Waste Management Plan. This schedule has been incorporated into milestones within the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). These Tri-Party milestones (designated the ''M-91'' series of milestones) relate to development of project management plans, completion of design efforts, construction and contracting schedules, and initiation of process operations. The milestone allows for modification of an existing facility, construction of a new facility, and/or commercial contracting to provide the capabilities for processing and certification of RH-TRU wastes for disposal at the WIPP. The development of a Project Management Plan (PMP) for TRU waste is the first significant step in the development of a program for disposal of Hanford's RH-TRU waste. This PMP will address the path forward for disposition of waste streams that cannot be prepared for disposal in the Hanford Waste Receiving and Processing facility (a contact-handled, small container facility) or other Site facilities. The PMP development effort has been initiated, and the PMP will be provided to the regulators for their approval by June 30, 2000. This plan will detail the

  9. Industrial advanced turbine systems: Development and demonstration. Quarterly report, October 1--December 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    The US DOE has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The Industrial ATS Development and Demonstration program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program. Phase 3 of the work is separated into two subphases: Phase 3A entails Component Design and Development; Phase 3B will involve Integrated Subsystem Testing. Phase 4 will cover Host Site Testing. Forecasts call for completion of the program within budget as originally estimated. Scheduled completion is forecasted to be approximately 3 years late to original plan. This delay has been intentionally planned in order to better match program tasks to the anticipated availability of DOE funds. To ensure the timely realization of DOE/Solar program goals, the development schedule for the smaller system (Mercury 50) and enabling technologies has been maintained, and commissioning of the field test unit is scheduled for May of 2000. As of the end of the reporting period work on the program is 24.7% complete (22.8% last quarter). Work on the Mercury 50 development and ATS technology development portions of the program (WBS 10000 et seq) is 41.6% complete. Although a great amount of work occurred in the quarter, a significant amount of this work entailed the revision and rerelease of several Mercury 50 drawings. Estimates of percent compete are based upon milestones completed. In order to maintain objectivity in assessing schedule progress, Solar uses a 0/100 percent complete assumption for milestones rather than subjectively estimating progress toward completion of milestones. Cost and schedule variation information is provided in Section 4.0 Program Management.

  10. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  11. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  12. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  13. Fuego/Scefire MPMD Coupling L2 Milestone Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Flint [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tencer, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pautz, Shawn D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Drumm, Clifton R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    This milestone campaign was focused on coupling Sandia physics codes SIERRA low Mach module Fuego and RAMSES Boltzmann transport code Sceptre(Scefire). Fuego enables simulation of low Mach, turbulent, reacting, particle laden flows on unstructured meshes using CVFEM for abnormal thermal environments throughout SNL and the larger national security community. Sceptre provides simulation for photon, neutron, and charged particle transport on unstructured meshes using Discontinuous Galerkin for radiation effects calculations at SNL and elsewhere. Coupling these ”best of breed” codes enables efficient modeling of thermal/fluid environments with radiation transport, including fires (pool, propellant, composite) as well as those with directed radiant fluxes. We seek to improve the experience of Fuego users who require radiation transport capabilities in two ways. The first is performance. We achieve this through leveraging additional computational resources for Scefire, reducing calculation times while leaving unaffected resources for fluid physics. This approach is new to Fuego, which previously utilized the same resources for both fluid and radiation solutions. The second improvement enables new radiation capabilities, including spectral (banded) radiation, beam boundary sources, and alternate radiation solvers (i.e. Pn). This summary provides an overview of these achievements.

  14. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  15. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  16. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  17. IAEA Patient Protection Effort Reaches Key Milestone

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An International Atomic Energy Agency (IAEA) effort to help people track their radiation exposure from medical procedures achieved a significant milestone this week. The Agency received the final approval from a group of medical oversight organizations for the 'Joint Position Statement on the IAEA Patient Radiation Exposure Tracking', a set of principles to guide patient protection efforts at the sub-national, national, and international level. The joint statement endorses the IAEA's three-year-old Smart Card/SmartRadTrack project, which aims to help nations develop systems to track medical radiation procedures and radiation doses. The statement has been agreed by the World Health Organization (WHO), the U.S. Food and Drug Administration (FDA), the European Society of Radiology (ESR), the International Organization for Medical Physics (IOMP), the International Society of Radiographers and Radiological Technologists (ISRRT), and the Conference of Radiation Control Program Directors, USA (CRCPD). 'This system is critical if the medical community is going to keep patients safe when they are being referred for more and more diagnostic scans. These scans, over the years, are made using more and more powerful machines', said Madan Rehani, Radiation Safety Specialist in the IAEA's Radiation Protection of Patients Unit. 'The tracking system will draw doctors' attention to previous radiological examinations, both in terms of clinical information and radiation dose and thus help them assess whether the 11th or 20th CT scan is really appropriate, whether it will do more good than harm.' Advances in radiation-based diagnostic technologies, such as the CT scan, have led to patients receiving such procedures more frequently. The convenience of CT with the added advantage of increased information has resulted in increased usage to the point that there are instances of patients getting tens of CT scans in a few years, not all of which may be justified, or getting CT

  18. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  19. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  20. Management of transuranium-contaminated solid wastes from the Department of Energy nuclear materials production and R and D programs

    International Nuclear Information System (INIS)

    Perge, A.F.; Trice, V.G. Jr.

    1978-01-01

    This plan has been extracted from a master plan that covers management of all types of wastes for which the Department of Energy (DOE) has responsibility. The overall plan has not received approval as policy for the new DOE which came into being in October 1977. Thus, we have to label it as a draft plan, even though our programs, as operating today, are being carried forward in conformance with most of it. Several of our assumptions are controversial and may be modified before the plan is approved. The points we will cover are: A. Goals, B. Scope, C. Assumptions, D. Strategy, E. Specific Objectives, F. Current Activities, and G. Milestones and Schedule. The last point, Milestones and Schedule, was not covered at the meeting. However, it is included here in the proceedings

  1. BR-SIPP: PETROBRAS Integrated Scheduling System; BR-SIPP: Sistema Integrado de Progamacao de Producao da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Cristiane S.; Joly, Marcel; Hassimotto, Marcelo K.; Magalhaes, Marcus Vinicius O. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The lack of a computational aided technology to support short-term scheduling activity in the oil and petrochemical sector has been identified as one of the major obstacles to the harmonic integration of production objectives subsequent to the implementation of the advanced control systems and the consolidation of important benefits at the process unit level. Such technology refers to an analytical tool able to capture plant operational information consistent with the scheduling layer demands, modeling the production system economic performance, and providing mechanisms to consider commercial, operation and technological uncertainties. In this context, PETROBRAS has continuously dedicated effort to develop, implement and enhance its own refinery scheduling solution. Nowadays at its second version, the PETROBRAS Integrated Scheduling System (BR-SIPP - INPI grant 00067400) has become the focus of corporate care, given its critical role on the link between planning objectives and plant operations, according to the hierarchical decision strategy currently adopted by PETROBRAS. This paper presents an overview of the tool and illustrates some real-world applications and main realized benefits. (author)

  2. Quality assurance (QA) for operations of fusion machines as applied to the tandem mirror experiment upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Chargin, A.K.; Damm, C.C.; Turner, W.C.

    1983-01-01

    Even the best QA plan and its successful execution during construction of a typical fusion machine will produce hardware that is inoperative for some fraction of time. Operating a machine with its hardware out of tolerance, with respect to the specifications, does produce data which is the goal of the experiment. However, a majority of such data are difficult to interpret and may not contribute to understanding the behavior of the experiment. In addition, few fusion machines just operate. The majority of the machines are in the process of being rebuilt and/or added to as they operate. These modifications can keep an otherwise operational machine from running. To insure quality in operation of TMX-U, the authors employ a series of QA procedures. They start with technical milestones, schedules, and budgets that are all negotiated with DOE. Within that framework they implement a total management scheme which, in addition to normal schedule and budget controls, includes: detailed experimental run plans, definition of machine configuration required to accomplish the run plan, subsystem work-ups, instrument calibration, verification of subsystem operation, and repetition of standard physics plasma parameters. All of these activities must be completed before taking data for the experimental run plan. If a subsystem is found out of tolerance, a decision must be made either to delay operation and fix the problem or to continue on a contingency-run plan which should still produce the data relevant to the project milestones. In this presentation those QA procedures for TMX-U operations that are applied to minimize the cost and time required to achieve the technical objectives are discussed

  3. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  4. Oak Ridge Reservation Federal Facility Agreement: Quarterly report for the Environmental Restoration Program. Volume 2, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report provides information about ER Program activities conducted on the Oak Ridge Reservation under the Federal Facility Agreement (FFA). Specifically, it includes information on milestones scheduled for completion during the reporting period as well as scheduled for completion during the next reporting period (quarter), accomplishments of the ER Program, concerns related to program work, and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  5. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  6. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  7. Multi-objective group scheduling with learning effect in the cellular manufacturing system

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Taghavi-fard

    2011-01-01

    Full Text Available Group scheduling problem in cellular manufacturing systems consists of two major steps. Sequence of parts in each part-family and the sequence of part-family to enter the cell to be processed. This paper presents a new method for group scheduling problems in flow shop systems where it minimizes makespan (Cmax and total tardiness. In this paper, a position-based learning model in cellular manufacturing system is utilized where processing time for each part-family depends on the entrance sequence of that part. The problem of group scheduling is modeled by minimizing two objectives of position-based learning effect as well as the assumption of setup time depending on the sequence of parts-family. Since the proposed problem is NP-hard, two meta heuristic algorithms are presented based on genetic algorithm, namely: Non-dominated sorting genetic algorithm (NSGA-II and non-dominated rank genetic algorithm (NRGA. The algorithms are tested using randomly generated problems. The results include a set of Pareto solutions and three different evaluation criteria are used to compare the results. The results indicate that the proposed algorithms are quite efficient to solve the problem in a short computational time.

  8. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  9. Simultaneous personnel and vehicle shift scheduling in the waste management sector.

    Science.gov (United States)

    Ghiani, Gianpaolo; Guerriero, Emanuela; Manni, Andrea; Manni, Emanuele; Potenza, Agostino

    2013-07-01

    Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. A suggested emergency medicine boot camp curriculum for medical students based on the mapping of Core Entrustable Professional Activities to Emergency Medicine Level 1 milestones

    Directory of Open Access Journals (Sweden)

    Lamba S

    2016-03-01

    Full Text Available Sangeeta Lamba, Bryan Wilson, Brenda Natal, Roxanne Nagurka, Michael Anana, Harsh Sule Department of Emergency Medicine, Rutgers New Jersey Medical School, Newark, NJ, USA Background: An increasing number of students rank Emergency Medicine (EM as a top specialty choice, requiring medical schools to provide adequate exposure to EM. The Core Entrustable Professional Activities (EPAs for Entering Residency by the Association of American Medical Colleges combined with the Milestone Project for EM residency training has attempted to standardize the undergraduate and graduate medical education goals. However, it remains unclear as to how the EPAs correlate to the milestones, and who owns the process of ensuring that an entering EM resident has competency at a certain minimum level. Recent trends establishing specialty-specific boot camps prepare students for residency and address the variability of skills of students coming from different medical schools. Objective: Our project’s goal was therefore to perform a needs assessment to inform the design of an EM boot camp curriculum. Toward this goal, we 1 mapped the core EPAs for graduating medical students to the EM residency Level 1 milestones in order to identify the possible gaps/needs and 2 conducted a pilot procedure workshop that was designed to address some of the identified gaps/needs in procedural skills. Methods: In order to inform the curriculum of an EM boot camp, we used a systematic approach to 1 identify gaps between the EPAs and EM milestones (Level 1 and 2 determine what essential and supplemental competencies/skills an incoming EM resident should ideally possess. We then piloted a 1-day, three-station advanced ABCs procedure workshop based on the identified needs. A pre-workshop test and survey assessed knowledge, preparedness, confidence, and perceived competence. A post-workshop survey evaluated the program, and a posttest combined with psychomotor skills test using three

  11. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  12. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  13. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  14. LS1 “First Long Shutdown of LHC and its Injector Chains”

    CERN Multimedia

    Foraz, K; Barberan, M; Bernardini, M; Coupard, J; Gilbert, N; Hay, D; Mataguez, S; McFarlane, D

    2014-01-01

    The LHC and its Injectors were stopped in February 2013, in order to maintain, consolidate and upgrade the different equipment of the accelerator chain, with the goal of achieving LHC operation at the design energy of 14 TeV in the centre-of-mass. Prior to the start of this First Long Shutdown (LS1), a major effort of preparation was performed in order to optimize the schedule and the use of resources across the different machines, with the aim of resuming LHC physics in early 2015. The rest of the CERN complex will restart beam operation in the second half of 2014. This paper presents the schedule of the LS1, describes the organizational set-up for the coordination of the works, the main activities, the different main milestones, which have been achieved so far, and the decisions taken in order to mitigate the issues encountered.

  15. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  16. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems.

    Science.gov (United States)

    van de Ven, Hardy A; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-09-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are associated with better sleep, need for recovery, health and performance. Questionnaire data were collected from 491 shift workers of 18 companies with 9 regular (semi)-continuous shift schedules. The shift schedule characteristics were analyzed separately and combined using multilevel linear regression models. The hypothesis was largely not confirmed. Relatively few associations were found, of which the majority was in the direction as expected. In particular early starts of morning shifts and many consecutive shifts seem to be avoided. The healthy worker effect, limited variation between included schedules and the cross-sectional design might explain the paucity of significant results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  18. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  19. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  20. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  1. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  2. Impact of modules on the ACR construction schedule

    International Nuclear Information System (INIS)

    Choy, Ed; Elgohary, Medhat; Fairclough, Neville; Yu, Stephen; Murayama, Kouichi; Miura, Jun; Kawahata, Junichi

    2003-01-01

    The ACR (Advanced CANDU Reactor), developed by Atomic Energy of Canada Ltd. (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. For ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. AECL, recognizing the immense benefit of collective experience, is partnering with Hitachi Ltd in the development of the ACR power plant design. AECL has gained valuable experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China, and Hitachi likewise has enjoyed success in modular construction of ABWRs in Japan. Utilizing these experiences, AECL is developing the ACR nuclear steam plant (NSP) and Hitachi is developing the Turbine Building. An overall construction strategy, which builds on the success of these construction methods from the nuclear power plant developments in China and Japan, has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. Modules and prefabrications are major features of the ACR design, resulting in an excess of 80% of Reactor Building internal work being completed as modules or as very streamlined traditional construction. This paper reviews the ACR construction strategy and provides examples of modules and how they impact on the ACR construction schedule. In conclusion, the ACR-700 is designed using the latest, proven construction methods to achieve a 36 month construction period for the nth replicated unit. (author)

  3. 15th Annual Expeditionary Warfare Conference - Expeditionary Operations - What’s Next

    Science.gov (United States)

    2010-10-07

    kinetic, low-order, high-order neutralization Forensics  Radiographic systems  Post Blast investigation  Wireless transmission/reception* Where...mentoring and partnering; and establishes the conditions for successful introduction of follow-on forces in zone IOT support the expansion of...Readiness Review CDD Spec Development Milestones/ Reviews Follow Vessel Schedule AoA Lead Vessel Schedule DT&E/ OT&E/ LFT&E IOT &E T&E Program

  4. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  5. Gender Still Matters: Effects of Workplace Discrimination on Employment Schedules of Young Professionals

    Directory of Open Access Journals (Sweden)

    Gabriele Plickert

    2017-11-01

    Full Text Available The influx of women into the legal profession has significantly changed the landscape of legal practice. Women lawyers today no longer face the challenges to entering the legal profession they encountered thirty years ago. However, despite these advancements, research continues to demonstrate that there are still gender-based issues women have to face in the legal workplace. Among these issues to date are the difficulties in combining responsibilities of work with responsibilities of families and children that underpin women’s employment and earning disadvantages. Using survey data from a national representative U.S. panel study of lawyers, we examine how work schedules, comparing full-time to part-time work, vary by personal disposition and workplace characteristics. Drawing from prominent explanations of gender inequality in the legal profession, we focus on inquiries of commitment to work, performance, ideal worker expectations, practice settings, and job satisfaction among dimensions of workplace characteristics and examine their effects on women and men lawyers’ work schedules. Logistic regression results show that work schedules significantly vary by gender, parental role, and experience of workplace discrimination. We find that, although all parents experience types of discrimination, there are still major differences in work schedules between mothers and fathers. Our study adds to the gender debate of employment and organizations by examining quantitatively experiences of workplace discrimination.

  6. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  7. Intermittent Metronomic Drug Schedule Is Essential for Activating Antitumor Innate Immunity and Tumor Xenograft Regression

    Directory of Open Access Journals (Sweden)

    Chong-Sheng Chen

    2014-01-01

    Full Text Available Metronomic chemotherapy using cyclophosphamide (CPA is widely associated with antiangiogenesis; however, recent studies implicate other immune-based mechanisms, including antitumor innate immunity, which can induce major tumor regression in implanted brain tumor models. This study demonstrates the critical importance of drug schedule: CPA induced a potent antitumor innate immune response and tumor regression when administered intermittently on a 6-day repeating metronomic schedule but not with the same total exposure to activated CPA administered on an every 3-day schedule or using a daily oral regimen that serves as the basis for many clinical trials of metronomic chemotherapy. Notably, the more frequent metronomic CPA schedules abrogated the antitumor innate immune and therapeutic responses. Further, the innate immune response and antitumor activity both displayed an unusually steep dose-response curve and were not accompanied by antiangiogenesis. The strong recruitment of innate immune cells by the 6-day repeating CPA schedule was not sustained, and tumor regression was abolished, by a moderate (25% reduction in CPA dose. Moreover, an ~20% increase in CPA dose eliminated the partial tumor regression and weak innate immune cell recruitment seen in a subset of the every 6-day treated tumors. Thus, metronomic drug treatment must be at a sufficiently high dose but also sufficiently well spaced in time to induce strong sustained antitumor immune cell recruitment. Many current clinical metronomic chemotherapeutic protocols employ oral daily low-dose schedules that do not meet these requirements, suggesting that they may benefit from optimization designed to maximize antitumor immune responses.

  8. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  9. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  10. 18 CFR 260.1 - FERC Form No. 2, Annual report for Major natural gas companies.

    Science.gov (United States)

    2010-04-01

    ... report for Major natural gas companies. 260.1 Section 260.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.1 FERC Form No. 2, Annual report for Major natural gas companies. (a...

  11. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  12. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  13. Major heat exchanger performance in Ontario Hydro-operated CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Dueck, D.G.

    1980-01-01

    The performance of heat exchangers is described in terms of their impact on the unit in the form of forced outages and deratings as well as incapability due to scheduled outages. Some major problems with heat exchangers are highlighted. (auth)

  14. Proposal for the completion of outstanding work on the installation scheduling and alignment of the SDC central calorimeter

    International Nuclear Information System (INIS)

    Guarino, V.; Hill, N.; Nasiatka, J.; Petereit, E.; Price, L.

    1993-01-01

    The High Energy Physic Division at Argonne National Laboratory was given the task of developing the procedures, fixtures, and schedules for the final assembly of the barrel and endcap calorimeters for the SDC. The work completed led to some major decision about how and where this assembly work would be done. The primary assembly decision was the feasibility of assembling the major detector components (barrel and endcap sub-assemblies) above ground and lowering them into position in the experimental hall, as opposed to assembling the calorimeter directly in the experimental hall. Due to cost of above ground assembly and schedule changes, the in-hall option was adopted. Although no actual hardware was constructed, many conceptual ideas were formalized and brought to workable solutions as a result of the effort put forth at ANL

  15. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  16. Iodine status and associations with feeding practices and psychomotor milestone development in six-month-old South African infants.

    Science.gov (United States)

    Osei, Jennifer; Baumgartner, Jeannine; Rothman, Marinel; Matsungo, Tonderayi M; Covic, Namukolo; Faber, Mieke; Smuts, Cornelius M

    2017-10-01

    Iodine is important for normal growth and psychomotor development. While infants below 6 months of age receive iodine from breast milk or fortified infant formula, the introduction of complementary foods poses a serious risk for deteriorating iodine status. This cross-sectional analysis assessed the iodine status of six-month-old South African infants and explored its associations with feeding practices and psychomotor milestone development. Iodine concentrations were measured in infant (n = 386) and maternal (n = 371) urine (urinary iodine concentration [UIC]), and in breast milk (n = 257 [breast milk iodine concentrations]). Feeding practices and psychomotor milestone development were assessed in all infants. The median (25th-75th percentile) UIC in infants was 345 (213-596) μg/L and was significantly lower in stunted (302 [195-504] μg/L) than non-stunted (366 [225-641] μg/L) infants. Only 6.7% of infants were deficient. Maternal UIC (128 [81-216] μg/L; r s  = 0.218, p psychomotor developmental scores were observed. Our results suggest that iodine intake in the studied six-month-old infants was adequate. Iodine in breast milk and commercial infant cereals potentially contributed to this adequate intake. © 2016 John Wiley & Sons Ltd.

  17. DEVELOPMENT MILESTONES AND TENDENCIES OF BANKING IN THE CZECH LANDS IN THE CONTEXT OF FINANCIAL LITERACY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Zdeněk Hruška

    2015-07-01

    Full Text Available In the paper there are presented the results obtained in the qualitative research in the area of banking with a specific focus on the history, present and development tendencies of banking in the Czech lands. The main target of the paper is to identify, analyze and evaluate the milestones and development tendencies in the banking system area (central banks and commercial banks in the Czech territory since the formation of the independent Czechoslovak state in 1918 until the present, i.e. 2015. The historical development is divided into seven stages when each stage is bordered by important events of a political and economical character which had a significant influence on the form of the banking system. The stages are dated in the years 1918 – 1939, 1939 – 1945, 1945 – 1989, 1989 – 1993, 1993 – 2004, 2004 – 2008 and 2008 – 2015. In the paper important milestones regarding the banking development are described and prediction of the expected banking system development future periods is performed. For each historical stage of banking development the key events which influenced the character of the banking system and the portfolio of offered services on banking market are identified in the paper. Also the main changes in the first stage of the banking system, namely in the central bank, are documented and analyzed.

  18. Development and usage of sportsturf: a survey of major utility areas ...

    African Journals Online (AJOL)

    Journal of Agriculture, Science and Technology ... Several major sports fields within Nairobi city offering playing grounds for soccer, golf, cricket, rugby and hockey were surveyed through direct interviews and ... There is a general lack of schedule of maintenance activities to match demand of expected sports events.

  19. The IJHPR publishes its 100th article, and other momentous milestones.

    Science.gov (United States)

    Rosen, Bruce; Israeli, Avi

    2013-12-19

    The Israel Journal of Health Policy Research (IJHPR) was launched in January 2012 and it is now publishing its 100th article. It was accepted into PubMed after only six months of publication and it has now also been accepted by Thomson Reuters for inclusion in the Web of Science as well as the Social Science Citation Index. It is rare for a new journal to reach these milestones at such an early stage in its development.One of the key factors in the journal's acceptance into these prestigious databases has been its unique national/international approach - exploring both what Israel can learn from health systems in other countries and what other countries can learn from Israeli health care. Another key factor has been its ability to attract high quality contributions from virtually all of the Israeli universities and research centers involved in health policy. A third important factor has been the journal's ability to engage leading international scholars as contributors and/or editorial board members.

  20. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  1. Milestones of mathematical model for business process management related to cost estimate documentation in petroleum industry

    Science.gov (United States)

    Khamidullin, R. I.

    2018-05-01

    The paper is devoted to milestones of the optimal mathematical model for a business process related to cost estimate documentation compiled during construction and reconstruction of oil and gas facilities. It describes the study and analysis of fundamental issues in petroleum industry, which are caused by economic instability and deterioration of a business strategy. Business process management is presented as business process modeling aimed at the improvement of the studied business process, namely main criteria of optimization and recommendations for the improvement of the above-mentioned business model.

  2. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  3. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  4. Using Advanced Mixed Waste Treatment Technology To Meet Accelerated Cleanup Program Milestones

    International Nuclear Information System (INIS)

    Larsen, P.J.; Garcia, J.; Estes, C.H.; Palmer, C.R.; Meyers, G.S.

    2006-01-01

    Some DOE Complex facilities are entering the late stages of facility closure. As waste management operations are completed at these sites, remaining inventories of legacy mixed wastes must be finally disposed. These wastes have unique physical, chemical and radiological properties that have made their management troublesome, and hence why they have remained on site until this late stage of closure. Some of these wastes have had no approved or practical treatment alternative until just recently. Results are provided from using advanced mixed waste treatment technology to perform two treatment campaigns on these legacy wastes. Combinations of macro-encapsulation, vacuum thermal desorption (VTD), and chemical stabilization, with off-site incineration of the organic condensate, provided a complete solution to the problem wastes. One program included approximately 1,900 drums of material from the Fernald Environmental Management Project. Another included approximately 1,200 drums of material from the Accelerated Cleanup Program at the Oak Ridge Reservation. Both of these campaigns were conducted under tight time schedules and demanding specifications, and were performed in a matter of only a few months each. Coordinated rapid waste shipment, flexible permitting and waste acceptance criteria, adequate waste receiving and storage capacity, versatile feed preparation and sorting capability, robust treatment technology with a broad feed specification, and highly reliable operations were all valuable components to successful accomplishment of the project requirements. Descriptions of the waste are provided; material that was difficult or impossible to treat in earlier phases of site closure. These problem wastes included: 1) the combination of special nuclear materials mixed with high organic chemical content and/or mercury, 2) high toxic metal content mixed with high organic chemical content, and 3) very high organic chemical content mixed with debris, solids and sludge

  5. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  6. Progress of EMBarrel assembly

    CERN Multimedia

    Chalifour, M

    2002-01-01

    The assembly of the sixteen "M" modules into a vertical axis cylinder has been achieved last Friday, completing the first wheel of the Electromagnetic Barrel Calorimeter (see picture). With this, an important milestone in the construction of the ATLAS detector has been reached. Future steps are the rotation of the cylinder axis into horizontal position, in order to integrate the presamplers and heat exchangers by the end of October. The transportation of the wheel and its insertion into the cryostat is the next major milestone, and is planned for the beginning of 2003. The construction of the modules (the so-called "P" modules) of the second wheel is ongoing at Saclay, Annecy and CERN, and will be completed in the coming months. The assembly of the second wheel should start at CERN in February, and its insertion in the cryostat is scheduled for June 2003. This achievement is the result of a successful collaboration of all institutes involved in the construction of the EM Barrel, namely Annecy, Saclay and CE...

  7. Exploration as a Mediator of the Relation between the Attainment of Motor Milestones and the Development of Spatial Cognition and Spatial Language

    Science.gov (United States)

    Oudgenoeg-Paz, Ora; Leseman, Paul P. M.; Volman, M. J. M.

    2015-01-01

    The embodied-cognition approach views cognition and language as grounded in daily sensorimotor child-environment interactions. Therefore, the attainment of motor milestones is expected to play a role in cognitive-linguistic development. Early attainment of unsupported sitting and independent walking indeed predict better spatial cognition and…

  8. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  9. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  10. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  11. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  12. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  13. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  14. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  15. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  16. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  17. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  18. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  19. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  20. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock