WorldWideScience

Sample records for major demonstration projects

  1. Tidd PFBC Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  2. A nationwide survey of patient centered medical home demonstration projects.

    Science.gov (United States)

    Bitton, Asaf; Martin, Carina; Landon, Bruce E

    2010-06-01

    The patient centered medical home has received considerable attention as a potential way to improve primary care quality and limit cost growth. Little information exists that systematically compares PCMH pilot projects across the country. Cross-sectional key-informant interviews. Leaders from existing PCMH demonstration projects with external payment reform. We used a semi-structured interview tool with the following domains: project history, organization and participants, practice requirements and selection process, medical home recognition, payment structure, practice transformation, and evaluation design. A total of 26 demonstrations in 18 states were interviewed. Current demonstrations include over 14,000 physicians caring for nearly 5 million patients. A majority of demonstrations are single payer, and most utilize a three component payment model (traditional fee for service, per person per month fixed payments, and bonus performance payments). The median incremental revenue per physician per year was $22,834 (range $720 to $91,146). Two major practice transformation models were identified--consultative and implementation of the chronic care model. A majority of demonstrations did not have well-developed evaluation plans. Current PCMH demonstration projects with external payment reform include large numbers of patients and physicians as well as a wide spectrum of implementation models. Key questions exist around the adequacy of current payment mechanisms and evaluation plans as public and policy interest in the PCMH model grows.

  3. A Nationwide Survey of Patient Centered Medical Home Demonstration Projects

    Science.gov (United States)

    Bitton, Asaf; Martin, Carina

    2010-01-01

    Background The patient centered medical home has received considerable attention as a potential way to improve primary care quality and limit cost growth. Little information exists that systematically compares PCMH pilot projects across the country. Design Cross-sectional key-informant interviews. Participants Leaders from existing PCMH demonstration projects with external payment reform. Measurements We used a semi-structured interview tool with the following domains: project history, organization and participants, practice requirements and selection process, medical home recognition, payment structure, practice transformation, and evaluation design. Results A total of 26 demonstrations in 18 states were interviewed. Current demonstrations include over 14,000 physicians caring for nearly 5 million patients. A majority of demonstrations are single payer, and most utilize a three component payment model (traditional fee for service, per person per month fixed payments, and bonus performance payments). The median incremental revenue per physician per year was $22,834 (range $720 to $91,146). Two major practice transformation models were identified—consultative and implementation of the chronic care model. A majority of demonstrations did not have well-developed evaluation plans. Conclusion Current PCMH demonstration projects with external payment reform include large numbers of patients and physicians as well as a wide spectrum of implementation models. Key questions exist around the adequacy of current payment mechanisms and evaluation plans as public and policy interest in the PCMH model grows. Electronic supplementary material The online version of this article (doi:10.1007/s11606-010-1262-8) contains supplementary material, which is available to authorized users. PMID:20467907

  4. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  5. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  6. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  7. Southern Nevada Alternative Fuels Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Hyde, Dan; Fast, Matthew

    2009-12-31

    The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this

  8. 40 CFR 117.14 - Demonstration projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous substance...

  9. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    International Nuclear Information System (INIS)

    Hinchman, R.R.; Zellmer, S.D.; Brent, J.J.

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely

  10. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  11. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  12. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  13. Photovoltaic demonstration projects 2

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J [Halcrow (William) and Partners, Swindon (UK); Kaut, W [eds.

    1989-01-01

    This book, the proceedings of the third Photovoltaic Contractors' Meeting organised by the Commission of the European Communities, Directorate-General for Energy provides an overview of the photovoltaic demonstration projects which have been supported by the Energy Directorate of the Commission of the European Communities since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984 and 1985, describing progress with their projects. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of houses, villages, recreation centres, water desalination, communications, dairy farms, water pumping and warning systems. (author).

  14. Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Craig [National Rural Electric Cooperative Association, Arlington, VA (United States); Carroll, Paul [National Rural Electric Cooperative Association, Arlington, VA (United States); Bell, Abigail [National Rural Electric Cooperative Association, Arlington, VA (United States)

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  15. 75 FR 31383 - Major Capital Investment Projects

    Science.gov (United States)

    2010-06-03

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCIES: Federal Transit Administration (FTA... current approach to evaluating and rating major capital investment projects (``New Starts'' and ``Small...'' to address identified transportation needs in the corridor without a major capital investment in new...

  16. Irvine Smart Grid Demonstration, a Regional Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Yinger, Robert [Southern California Edison Company, Rosemead, CA (United States); Irwin, Mark [Southern California Edison Company, Rosemead, CA (United States)

    2015-12-29

    ISGD was a comprehensive demonstration that spanned the electricity delivery system and extended into customer homes. The project used phasor measurement technology to enable substation-level situational awareness, and demonstrated SCE’s next-generation substation automation system. It extended beyond the substation to evaluate the latest generation of distribution automation technologies, including looped 12-kV distribution circuit topology using URCIs. The project team used DVVC capabilities to demonstrate CVR. In customer homes, the project evaluated HAN devices such as smart appliances, programmable communicating thermostats, and home energy management components. The homes were also equipped with energy storage, solar PV systems, and a number of energy efficiency measures (EEMs). The team used one block of homes to evaluate strategies and technologies for achieving ZNE. A home achieves ZNE when it produces at least as much renewable energy as the amount of energy it consumes annually. The project also assessed the impact of device-specific demand response (DR), as well as load management capabilities involving energy storage devices and plug-in electric vehicle charging equipment. In addition, the ISGD project sought to better understand the impact of ZNE homes on the electric grid. ISGD’s SENet enabled end-to-end interoperability between multiple vendors’ systems and devices, while also providing a level of cybersecurity that is essential to smart grid development and adoption across the nation. The ISGD project includes a series of sub-projects grouped into four logical technology domains: Smart Energy Customer Solutions, Next-Generation Distribution System, Interoperability and Cybersecurity, and Workforce of the Future. Section 2.3 provides a more detailed overview of these domains.

  17. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  18. The Advanced Linked Extended Reconnaissance & Targeting Technology Demonstration project

    Science.gov (United States)

    Edwards, Mark

    2008-04-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing many operational needs of the future Canadian Army's Surveillance and Reconnaissance forces. Using the surveillance system of the Coyote reconnaissance vehicle as an experimental platform, the ALERT TD project aims to significantly enhance situational awareness by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. The project is exploiting important advances made in computer processing capability, displays technology, digital communications, and sensor technology since the design of the original surveillance system. As the major research area within the project, concepts are discussed for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as from beyond line-of-sight systems such as mini-UAVs and unattended ground sensors. Video-rate image processing has been developed to assist the operator to detect poorly visible targets. As a second major area of research, automatic target cueing capabilities have been added to the system. These include scene change detection, automatic target detection and aided target recognition algorithms processing both IR and visible-band images to draw the operator's attention to possible targets. The merits of incorporating scene change detection algorithms are also discussed. In the area of multi-sensor data fusion, up to Joint Defence Labs level 2 has been demonstrated. The human factors engineering aspects of the user interface in this complex environment are presented, drawing upon multiple user group sessions with military surveillance system operators. The paper concludes with Lessons Learned from the project. The ALERT system has been used in a number of C4ISR

  19. Hydrogen fueling demonstration projects using compact PSA purification

    International Nuclear Information System (INIS)

    Ng, E.; Smith, T.

    2004-01-01

    'Full text:' Hydrogen fueling demonstration projects are critical to the success of hydrogen as an automotive fuel by building public awareness and demonstrating the technology required to produce, store, and dispense hydrogen. Over 75 of these demonstration projects have been undertaken or are in the planning stages world-wide, sponsored by both the public and private sectors. Each of these projects represents a unique combination of sponsors, participants, geographic location, and hydrogen production pathway. QuestAir Technologies Inc., as the industry leader in compact pressure swing adsorption equipment for purifying hydrogen, has participated in four hydrogen fueling demonstration projects with a variety of partners and in North America and Japan. QuestAir's experiences as a participant in the planning, construction, and commissioning of these demonstration projects will be presented in this paper. The unique challenges of each project and the critical success factors that must to be considered for successful deployment of high-profile, international, and multi-vendor collaborations will also be discussed. The paper will also provide insights on the requirements for hydrogen fueling demonstration projects in the future. (author)

  20. Interdisciplinary Project Experiences: Collaboration between Majors and Non-Majors

    Science.gov (United States)

    Smarkusky, Debra L.; Toman, Sharon A.

    2014-01-01

    Students in computer science and information technology should be engaged in solving real-world problems received from government and industry as well as those that expose them to various areas of application. In this paper, we discuss interdisciplinary project experiences between majors and non-majors that offered a creative and innovative…

  1. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1999-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the team of stakeholders; Move the site for the commercial demonstration to LTV Steel, Cleveland, Ohio; Permitting for new site; Site specific engineering; Cost update of the project as it relates to the Cleveland location; FETC update; DCAA audit; and Updated endorsement of Calderon process by Ohio EPA and U.S. EPA, Region 5

  3. Evaluation of rubber modified asphalt demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.

  4. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    Energy Technology Data Exchange (ETDEWEB)

    Gasper, John R. [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory; Wigmosta, Mark S. [PNNL; Voisin, Nathalie [PNNL; Rakowski, Cynthia [PNNL; Coleman, Andre [PNNL; Lowry, Thomas S. [SNL

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  5. West Valley Demonstration Project annual report to Congress

    International Nuclear Information System (INIS)

    1990-01-01

    By the end of the fiscal year, the West Valley Demonstration Project had processed 757,000 litres of liquid high-level waste, removing most of the radioactive constituents by ion exchange. The radioactive ion exchange material is being stored in an underground tank pending its incorporation, along with sludge still in the tank, into borosilicate glass. The decontaminated salt solution was solidified into a cement low-level waste form which has been reviewed and endorsed by the Nuclear Regulatory Commission. Five tests of the waste glass melter system were completed. A Notice of Intent was published to prepare a joint federal/state Environmental Impact Statement. Design of the Vitrification Facility, a major milestone, was completed and construction of the facility enclosure has begun. A Department of Energy Tiger Team and Technical Safety Appraisal of the Project found no undue risks to worker or public health and safety or the environment

  6. Earth Science Capability Demonstration Project

    Science.gov (United States)

    Cobleigh, Brent

    2006-01-01

    A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.

  7. Alderney 5 complex demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, D. [High Performance Energy Systems, Halifax, NS (Canada)

    2008-07-01

    The Halifax Regional Municipality (HRM) is the largest municipality in Atlantic Canada. This presentation described the flagship facility and the energy efficiency retrofit of five HRM-owned buildings called the Alderney 5 complex. The 5 objectives of the demonstration project involved a district-scale cooling project; replacement of chillers with harbour cooling; and replacement of a high exergy system with a low exergy system. Synergies and challenges of the project were also identified. The presentation also referred to borehole thermal energy storage; existing Halifax Harbour cooling; Halifax Harbour temperatures; cold energy geothermal borehole field; and the benefits of advanced concentric boreholes. A project update and progress to date were also provided. The Alderney 5 project represents the first concentric borehole technology for use to store and retrieve cold energy. tabs., figs.

  8. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  9. Town of Edinburg landfill reclamation demonstration project. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County, with majority funding provided by the New York State Energy Research and Development Authority. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified

  10. The development of the human exploration demonstration project (HEDP), a planetary systems testbed

    Science.gov (United States)

    Chevers, Edward S.; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the National Aeronautics and Space Administration's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment will consist of life support systems, physiological monitoring of project crew, a virtual environment workstation, and centralized data acquisition and habitat systems health monitoring. There will be several robotic systems on a simulated planetary landscape external to the habitat environment to provide representative work loads for the crew. This paper describes the status of the HEDP after one year, the major facilities composing the HEDP, the project's role as an Ames Research Center testbed, and the types of demonstration scenarios that will be run to showcase the technologies.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Scott Staley

    2010-03-31

    the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

  12. Supercompaction/grouting demonstration project: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration

  13. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  14. Texas ''Recycled Content''/Advanced Green Builder Demonstration Home Project

    International Nuclear Information System (INIS)

    Fisk, P. III; Vittori, G.

    1993-01-01

    This paper presents an overview of principal issues addressed in the Advanced Green Builder Demonstration Home Project, with units to be constructed in Austin and Laredo. The project's objective is to introduce these distinct communities to a range of ''green'' housing materials and methods, emphasizing opportunities for recycled-content and by-product based construction materials. The project, principally funded by U.S. Department of Energy Oil Overcharge Funds administered by the Texas Governor's Energy Office, also is supported by several state, regional, and municipal agencies. As such, the project reflects a regional process, as open to adaptation to a region's natural resources as it is to its peoples. The design is specifically intended to bridge issues of social and family concerns, such as affordability, expandibility, and economic development. This is a result of a modular-based design framework, coupled with reliance on environmentally-conscious regional manufacture of by-product based materials. Environmental issues are addressed by establishing a user for pollutants considered major contributors to global concerns of acid rain (due to release of sulphur dioxide), global warming (due to release of carbon dioxide), and deforestation. The homes will be built without virgin wood products or portland cement

  15. Pacific Northwest Smart Grid Demonstration Project Technology Performance Report Volume 1: Technology Performance

    Energy Technology Data Exchange (ETDEWEB)

    Melton, Ron [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-06-01

    The Pacific Northwest Smart Grid Demonstration (PNWSGD), a $179 million project that was co-funded by the U.S. Department of Energy (DOE) in late 2009, was one of the largest and most comprehensive demonstrations of electricity grid modernization ever completed. The project was one of 16 regional smart grid demonstrations funded by the American Recovery and Reinvestment Act. It was the only demonstration that included multiple states and cooperation from multiple electric utilities, including rural electric co-ops, investor-owned, municipal, and other public utilities. No fewer than 55 unique instantiations of distinct smart grid systems were demonstrated at the projects’ sites. The local objectives for these systems included improved reliability, energy conservation, improved efficiency, and demand responsiveness. The demonstration developed and deployed an innovative transactive system, unique in the world, that coordinated many of the project’s distributed energy resources and demand-responsive components. With the transactive system, additional regional objectives were also addressed, including the mitigation of renewable energy intermittency and the flattening of system load. Using the transactive system, the project coordinated a regional response across the 11 utilities. This region-wide connection from the transmission system down to individual premises equipment was one of the major successes of the project. The project showed that this can be done and assets at the end points can respond dynamically on a wide scale. In principle, a transactive system of this type might eventually help coordinate electricity supply, transmission, distribution, and end uses by distributing mostly automated control responsibilities among the many distributed smart grid domain members and their smart devices.

  16. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  17. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  18. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the project team-players; Recruiting Koppers Industries as an additional stakeholder; Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and Further progress made in the design of the commercial coking reactor

  19. Multiview Projection Using CADKEY Freeze-Frame Demonstrations.

    Science.gov (United States)

    Kelso, Robert P.; Ziai, M. Reza

    1988-01-01

    Describes a three-dimensional computer aided design software package, CADKEY, for demonstrating orthographic orthodirectional projection theory to a classroom. Provides several figures for showing the demonstrations. (Author/YP)

  20. 78 FR 22527 - TRICARE Access to Care Demonstration Project

    Science.gov (United States)

    2013-04-16

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Access to Care Demonstration Project AGENCY... is to advise interested parties of a 2-year extension of the demonstration project in which the... project will continue through May 4, 2015. ADDRESSES: TRICARE Management Activity, Health Plan Operations...

  1. An overview of waste management systems at the West Valley demonstration project

    International Nuclear Information System (INIS)

    McIntosh, T.W.; Bixby, W.W.; Krauss, J.E.; Leap, D.R.

    1988-01-01

    In 1980, the United States Congress passed into law the West Valley Demonstration Project Act authorizing the Department of Energy (DOE) to conduct a nuclear waste management project at a former commercial nuclear fuel reprocessing facility located in West Valley, New York. The Project's main objective is to solidify approximately two million litres of high-level radioactive liquid waste into a form suitable for transport to a federal repository for final disposal. The majority of the liquid waste was produced as a by-product of the PUREX extraction process and is stored in an underground steel tank. A waste characterization program has shown that the neutralized waste has settled into two distinct layers: a clear alkaline liquid (supernatant) layer and a dense precipitate (sludge) layer. The principle radioactive elements in the waste are cesium 137 (supernatant) and strontium 90 (sludge). This paper describes the overall project strategy, the waste management systems, the present project engineering and construction status and the project schedule leading to radioactive operation

  2. Demonstrating sustainable energy: A review-based model of sustainable energy demonstration projects

    NARCIS (Netherlands)

    Bossink, Bart

    2017-01-01

    This article develops a model of sustainable energy demonstration projects, based on a review of 229 scientific publications on demonstrations in renewable and sustainable energy. The model addresses the basic organizational characteristics (aim, cooperative form, and physical location) and learning

  3. McIntosh Unit 4 PCFB demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, A.M. [Lakeland Electric and Water, FL (United States); Dryden, R.J. [Foster Wheeler Development Corp., San Diego, CA (United States); Morehead, H.T. [Westinghouse Electric Corp., Orlando, FL (United States)

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  4. An overview of the West Valley demonstration project

    International Nuclear Information System (INIS)

    Hannum, W.H.; Boswell, M.B.; De Boer, T.K.; Duckworth, J.P.

    1984-01-01

    This session is titled ''DOE Special Waste Management Projects.'' West Valley and TMI are indeed special projects, in that they represent today's problems. They may well have been the two most visible symbols as to how nuclear wastes can poison the entire civilian nuclear power program. Each in its own way has been perceived as a major threat to the environment and to public health and safety; in both cases this threat has been perceived to be grossly more severe than it has been in fact. It is the Department of Energy' intent that both of these problems be made to disappear. This paper serves to introduce a series of paper describing the status of the West Valley Project. In the West Valley case substantial progress is being made and we believe we are well on the way toward transforming what has been a skeleton along the road to progress into positive and unmistakable evidence that high-level nuclear wastes such as those resulting from reprocessing can be managed, understood, and prepared for disposal by a straightforward adaptation and application of existing technologies. Further, we now have evidence that the costs of doing this are not exorbitant. Subsequent papers will describe waste characterization; the plans and designs for solidification; and the ancillary and supporting programs for handling effluents and wastes, for D and D to utilize existing facilities, and environmental support. In this paper we describe the history of this plant and the wastes being used in the demonstration; the legislation and intent of the Project; the accomplishments to date; and the projected schedule and costs

  5. An analysis of the demonstration projects for renewable energy application buildings in China

    International Nuclear Information System (INIS)

    Liu, Xingmin; Ren, Hong; Wu, Yong; Kong, Deping

    2013-01-01

    During the 2006–2008 period, there were 386 demonstration projects for renewable energy application buildings (REAB) organised by Chinese government, with a total area of approximately 40,420,000 m 2 . By the end of 2011, the vast majority of these projects had been completed and had passed the final acceptance. This paper analyses the measures taken by the Chinese government, including economic incentive mechanisms, organising agencies, application and evaluation systems, online monitoring platforms, acceptance inspections, assessment systems, standard criteria and so forth. This paper then evaluates the policy effects. The paper shows that there has been a satisfactory effect in the development of the REAB market, mobilising the enthusiasm of the government, equipment manufacturers and scientific research institutions, and promoting energy conservation. In addition, this paper analyses the suitability of different technological types in different climatic zones, which provides further guidance for the development of the REAB. Finally, based on the analyses of the problems met in the implementation of the demonstration projects, this paper proposes some policy suggestions concerning standard criteria, technological development, project management, incentive mechanisms and so on, to promote the development of the REAB more effectively in the future in China. - Highlights: • The policy measures to promote the development of renewable energy application buildings in China. • Evaluation of the demonstration policy effects in the market development and other aspects. • Analyses of the regional applicability for renewable energy application buildings in China. • Analyses of problems met in the implementation of the demonstration projects. • Put forward some policy suggestions on standard, technology, management, etc

  6. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  7. 78 FR 1991 - Major Capital Investment Projects

    Science.gov (United States)

    2013-01-09

    ... Administration 49 CFR Part 611 Major Capital Investment Projects; Notice of Availability of Proposed New Starts... Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Final rule. SUMMARY... capital investments seeking funding under the discretionary ``New Starts'' and ``Small Starts'' programs...

  8. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  9. Prototypical consolidation demonstration project - Final fuel recommendation report

    International Nuclear Information System (INIS)

    Piscitella, R.R.; Paskey, W.R.

    1987-01-01

    The Prototypical Consolidation Demonstration (PCD) Project will, in its final phase, conduct a demonstration of the equipment's ability to consolidate actual spent commercial fuel. Since budget and schedule limitations do not allow this demonstration to include all types of fuel assemblies, a selection process was utilized to identify the fuel types that would represent predominate fuel inventories and that would demonstrate the equipment's abilities. The Pressurized Water Reactor (PWR) fuel assemblies that were suggested for use in the PCD Project Hot Demonstration were Babcock and Wilcox (B and W) 15 x 15's, and Westinghouse (WE) 15 x 15's. The Boiling Water Reactor (BWR) fuel suggested was the General Electric (GE) 8 x 8

  10. Medicare Demonstration Projects and Evaluation Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) conducts and sponsors a number of innovative demonstration projects to test and measure the effect of potential...

  11. Project Integration Architecture: A Practical Demonstration of Information Propagation

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  12. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-01-01

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control, decontamination, in

  13. The ethanol heavy-duty truck fleet demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

  14. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  15. District heating demonstration project. Swiecie, Poland. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    In January 1997 the district heating company in Swiecie, Poland, was donated DKK 1.3 Mio. as a part of the environmental related energy sector programme by the Danish government for a demonstration project. The Danish consultancy company Carl Bro a/s was appointed to conduct the work. The project was finished in January 1999. The present final report outlines the activities of the demonstration project. The activities of the project were several. Carl Bro a/s elaborated tender documents and procured 79 heat meters for all the substrations in the city in order to prepare for the new energy law and a changed tariff system which was introduced in January 1999. Carl Bro a/s further supported ZEC Swiecie in the development of their new tariff system through information from Danish district heating companies. The demonstration project was designed in the first phase of the project. During the design period one engineer from Swiecie participated in a study tour to Denmark to learn about technical solutions to present problems in Poland. The training course focused on preparation of hot tap water. The site for the demonstation project was in the centre of Swiecie in a housing society located in Wojska Polskiego. The blocks 75 and 75A were selected for modernisation of the substations, and block no. 73 was appointed as a reference block in which only a heat meter was installed. Further, block 75A was equipped with thermostatic valves at all the radiators in the flats. The registered savings during the monitoring period were between 7% and 14%, and an increased comfort in the flats was observed. The housing society`s board of directors were so pleased with the project that by their initiative block no. 77 was refurbished in the same way as the blocks covered by the demonstration project. However, the activities were extended with individual heat meters and the introduction of a new tariff system for the block. The energy savings from this project were substantial, and today

  16. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    D' Annunzio, Julie [Ford Motor Company, Dearborn, MI (United States); Slezak, Lee [U.S. DOE Office of Energy Efficiency & Renewable Energy, Washington, DC (United States); Conley, John Jason [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2014-03-26

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  17. How is it going? Peformance assessment in major projects

    DEFF Research Database (Denmark)

    Maylor, Harvey; Johnson, Mark; Turner, Neil

    2017-01-01

    an enhanced service performance model. This was then tested using a survey and a structural equation model derived. Development of this yielded new classifications but most importantly, provided a more meaningful method for measuring the performance of operational transformation projects. Specifically......Determining the performance of a major project is a challenge for both practitioners and scholars. In the context of operational change projects the challenge is exacerbated by the service-intensive nature of the transformation, temporal disconnects between contracting and delivery and lack...... management in major projects from an OM perspective....

  18. Tidd PFBC demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Marrocco, M. [American Electric Power, Columbus, OH (United States)

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  19. Accelerated Innovation Deployment (AID) Demonstration Project : Intelligent Compaction and Infrared Scanning Projects

    Science.gov (United States)

    2018-02-01

    This report documents the Missouri Department of Transportation (MoDOT) demonstration grant award for field demonstration projects using intelligent compaction (IC) and infrared scanning (IR) (also called paver-mounted thermal profiles PMTP in the AA...

  20. Opportunities for low-cost CO2 storage demonstration projects in China

    International Nuclear Information System (INIS)

    Meng, Kyle C.; Williams, Robert H.; Celia, Michael A.

    2007-01-01

    Several CO 2 storage demonstration projects are needed in a variety of geological formations worldwide to prove the viability of CO 2 capture and storage as a major option for climate change mitigation. China has several low-cost CO 2 sources at sites that produce NH 3 from coal via gasification. At these plants, CO 2 generated in excess of the amount needed for other purposes (e.g., urea synthesis) is vented as a relatively pure stream. These CO 2 sources would potentially be economically interesting candidates for storage demonstration projects if there are suitable storage sites nearby. In this study a survey was conducted to estimate CO 2 availability at modern Chinese coal-fed ammonia plants. Results indicate that annual quantities of available, relatively pure CO 2 per site range from 0.6 to 1.1 million tonnes. The CO 2 source assessment was complemented by analysis of possible nearby opportunities for CO 2 storage. CO 2 sources were mapped in relation to China's petroliferous sedimentary basins where prospective CO 2 storage reservoirs possibly exist. Four promising pairs of sources and sinks were identified. Project costs for storage in deep saline aquifers were estimated for each pairing ranging from $15-21/t of CO 2 . Potential enhanced oil recovery and enhanced coal bed methane recovery opportunities near each prospective source were also considered

  1. West Valley Demonstration Project annual report

    International Nuclear Information System (INIS)

    1986-01-01

    In FY 1985 the most challenging goal of the Project to date, the start of verification testing of major subsystems of the Vitrification System, was accomplished. Individual testing of subsystems was completed in FY 1985 allowing for the start of integrated testing of all major portions of the Vitrification System. Other accomplishments during this period included completion of cleanup of the first of several former reprocessing cells, the first phase of testing and operation of the system which will solidify low-level liquid wastes and the beginning of construction to support installation of the Supernatant Treatment System which will be used to remove the radioactive fission products from the supernatant

  2. The public visits a nuclear waste site: Survey results from the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1987-01-01

    This paper discusses the results of the 1986 survey taken at the West Valley Demonstration Project Open House where a major nuclear waste cleanup is in progress. Over 1400 people were polled on what they think is most effective in educating the public on nuclear waste. A demographic analysis describes the population attending the event and their major interests in the project. Responses to attitudinal questions are examined to evaluate the importance of radioactive waste cleanup as an environmental issue and a fiscal responsibility. Additionally, nuclear power is evaluated on its public perception as an energy resource. The purpose of the study is to find out who visits a nuclear waste site and why, and to measure their attitudes on nuclear issues

  3. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  4. Clean Coal Diesel Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  5. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  6. Biological restoration of major transportation facilities domestic demonstration and application project (DDAP): technology development at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, James L., Jr. (.,; .); Melton, Brad; Finley, Patrick; Brockman, John; Peyton, Chad E.; Tucker, Mark David; Einfeld, Wayne; Griffith, Richard O.; Brown, Gary Stephen; Lucero, Daniel A.; Betty, Rita G.; McKenna, Sean Andrew; Knowlton, Robert G.; Ho, Pauline

    2006-06-01

    The Bio-Restoration of Major Transportation Facilities Domestic Demonstration and Application Program (DDAP) is a designed to accelerate the restoration of transportation nodes following an attack with a biological warfare agent. This report documents the technology development work done at SNL for this DDAP, which include development of the BROOM tool, an investigation of surface sample collection efficiency, and a flow cytometry study of chlorine dioxide effects on Bacillus anthracis spore viability.

  7. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  8. Project summary, 116-B-6-1 crib ISV [in situ vitrification] demonstration project

    International Nuclear Information System (INIS)

    Koegler, S.S.

    1989-01-01

    The 116-B Crib Demonstration Project is intended to demonstrate the emerging in situ vitrification (ISV) technology to immobilize or destroy hazardous and radioactive chemicals at an actual site. In situ vitrification is the conversion of contaminated soil into a durable glass and crystalline product through joule heating. The 116-B crib site was chosen for the demonstration because it contains both radioactive and hazardous chemicals (e.g., chromium) and presents a potential threat to environment. The project will involve sampling and analysis of the soil beneath the crib, a small-scale ISV test to verify operating parameters, vitrification of the crib, and analysis of the vitrified soil. 5 figs

  9. Radiation safety at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, R.L.

    1997-01-01

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable

  10. 77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings

    Science.gov (United States)

    2012-02-06

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...

  11. 75 FR 77379 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-12-10

    ... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research; Notice #0;#0..., authorizes the Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at... to execute a process and plan to employ the Department's personnel management demonstration project...

  12. International gas trade: Potential major projects

    International Nuclear Information System (INIS)

    Haamsoe, B.; Mashayekhi, A.; Razavi, H.

    1994-01-01

    The present paper reviews some key factors affecting continued expansion of the use and trade of natural gas, with a particular focus on a group of major gas trade and transport projects now in various stages of consideration. The paper begins by outlining the distribution of potential gas supplies, it also sketches the sectorial and regional structures of potential demand for natural gas. It continues by considering current and emerging trends in the international trade of natural gas by pipeline and as liquefied natural gas (LNG). Within the context thus provided, the paper then details a number of significant potential gas trade and transportation projects individually. Finally, the paper comments on the challenges in financing and implementing gas projects, especially with regard to economic, political, and institutional issues in the producing, transit, and consuming countries

  13. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Earle, L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sparn, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Rutter, A. [Sustainability Solutions LLC (Guam); Briggs, D. [Naval Base Guam, Santa Rita (Guam)

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  14. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Science.gov (United States)

    2010-01-01

    ... time on submitted proposals until comparisons can be made with other existing projects or with project... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  15. The HAW project: demonstration facility for the disposal of high-level waste in salt

    International Nuclear Information System (INIS)

    Rothfuchs, T.

    1991-01-01

    This publication is the interim report 1988-89 of the international HAW project performed in the 800 m level of the Asse salt mine in the Federal Republic of Germany. The major objective of this project is the pilot testing and demonstration of safe methods for the final disposal of high-level radioactive waste in geological salt deposits. The HAW-project is carried out by the GSF-Institut fuer Tieflagerung (IFT) in cooperation with the French Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA); the Spanish Empresa Nacional de Residuos Radiactivos S.A. (ENRESA) and the Netherlands Energy Research Foundation (ECN). After some delays in the licensing procedure the emplacement of 30 vitrified highly radioactive canisters (containers) is now envisaged for early 1991. 20 refs.; 92 figs.; 14 tabs

  16. Vitrification facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project's vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project's background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing

  17. Recycling and composting demonstration projects for the Memphis region

    Energy Technology Data Exchange (ETDEWEB)

    Muller, D. [Memphis and Shelby County Div. of Planning and Development, TN (United States)

    1992-05-01

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  18. Recycling and composting demonstration projects for the Memphis region

    Energy Technology Data Exchange (ETDEWEB)

    Muller, D. (Memphis and Shelby County Div. of Planning and Development, TN (United States))

    1992-05-01

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  1. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  2. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1996-01-01

    This project which deals with the demonstration of a full size commercial coking retort using Calderon's proprietary technology for making metallurgical coke ran into a commercialization problem by virtue that the designed retort for two (2) tons of coke/hour necessitates thirty-two (32) retorts to produce the 500,000 tons of coke per year for a commercial plant. Bechtel Mining and Metals prepared a cost estimate of the commercial plant which indicated the commercial plant would not be economically feasible. The activity during this reporting period was directed to making changes to the design of the coking retort in order to reduce the number of retorts required for a 500,000 ton/year commercial coke facility. The result of this activity resulted in the drastic reduction of the number of retorts to eight (8) with each retort projected to produce 8.17 tons of coke/hour. Such decrease in number of retorts makes the Calderon technology quite competitive and therefore commercially feasible

  3. Technical and administrative approach for the West Valley Demonstration Project Safety Program

    International Nuclear Information System (INIS)

    Newsom, P.C.; Roberts, C.J.; Yuchien Yuan; Marchetti, S.

    1987-06-01

    The principal objective of the West Valley Demonstration Project (WVDP) is to vitrify the 2.2 million liters of high-level radioactive waste (HLW) stored at the Western New York Nuclear Service Center (WNYNSC). This simple statement of purpose, however, does not convey a sense of the complexity of the undertaking. The vitrification task is not only complex in and of itself, but requires a myriad of other activities to be accomplished on an intricate and fast paced schedule in order to support it. The West Valley Demonstration Project Act (P.L 96-368), U.S. Department of Energy Order DOE-5481.1A, Idaho Operations Office Order ID-5481.1 and standard nuclear industry practice all require that proposed systems and operations involving hazards not routinely encountered by the general public be analyzed to identify potential hazards and consequences, and to assure that reasonable measures are taken to eliminate, control, or mitigate these potential consequences. Virtually every substantive aspect of the WVDP involves hazards beyond those routinely encountered and accepted by the general public. In order to assure the safety of the public and the workers at the WVDP, a system of hazard identification, categorization, analysis and review has been established. In parallel with this system, a procedure for developing the minimum design specifications and quality assurance requirements has been developed for Project systems, components, and structures which play a role in the safety of a specific major facility or the overall Project. 29 refs., 3 figs., 6 tabs

  4. Hydrogen demonstration projects options in the Netherlands. Final report

    International Nuclear Information System (INIS)

    Bergsma, G.C.; Van der Werff, T.T.; Rooijers, F.J.

    1996-01-01

    Based on a survey of hydrogen demonstration projects, contacts with different actors and discussions in a sounding board for the study on the title subject, it is concluded that a conference can be organized where the possibilities of setting up hydrogen demonstration projects in the Netherlands can be discussed. The following projects offer good chances to be realized in the next few years: large-scale CO 2 storage in the underground, applying enhanced gas recovery. It appears to be a relatively cheap CO 2 emission reduction measure with a large potential. It can be combined with a hydrogen mixing project with the sale of hydrogen as a so-called eco-gas to consumers. There is little interest in the other options for CO 2 storage at coal gasification and the prompt supply of 100% H 2 to small-scale consumers. Hydrogen for cogeneration, fuel cells in the industry, hydrogen in road transport and hydrogen as a storage medium are projects in which some actors are interested. Hydrogen for air transport has a large potential to which only few parties in the Netherlands can anticipate. Hydrogen demonstration projects will show important surplus value when it is supported by a hydrogen research program. Such a program can be carried out in cooperation with several other programmes of the International Energy Agency, in Japan, Germany and a number of research programs of the Netherlands Agency for Energy and the Environment (Novem). 10 figs., 4 tabs., 33 refs

  5. Major gas projects in Latin America. Issues and perspectives

    International Nuclear Information System (INIS)

    Khelil, C.

    1997-01-01

    The Latin American energy demand will reach 677 MTOE by 2010, a 50% increase over 1995. There will be a major shift towards use of natural gas in power generation. US 503 10 9 Dollars will be required over 1995-2010 to discover and develop hydrocarbon reserves, build the pipeline system as well as generate and distribute electricity. US 19 10 9 Dollars will be required for gas pipelines and LNG projects in the region. Improvements in the policy, legal and regulatory framework are required in many countries to attract the needed investments. Several major gas projects are being implemented or planned in the region: Colombia Enron-built pipeline, Peru Camisea project, Chile Nova gas pipeline from Argentina, the Bolivia-Brazil pipeline and others. The World Bank group has been assisting countries in developing a competitive business environment and can provide, when needed, comfort to lenders in project financing through a guarantee scheme in several large complex cross border projects. (au)

  6. Waste Energy Recovery from Natural Gas Distribution Network: CELSIUS Project Demonstrator in Genoa

    Directory of Open Access Journals (Sweden)

    Davide Borelli

    2015-12-01

    Full Text Available Increasing energy efficiency by the smart recovery of waste energy is the scope of the CELSIUS Project (Combined Efficient Large Scale Integrated Urban Systems. The CELSIUS consortium includes a world-leading partnership of outstanding research, innovation and implementation organizations, and gather competence and excellence from five European cities with complementary baseline positions regarding the sustainable use of energy: Cologne, Genoa, Gothenburg, London, and Rotterdam. Lasting four-years and coordinated by the City of Gothenburg, the project faces with an holistic approach technical, economic, administrative, social, legal and political issues concerning smart district heating and cooling, aiming to establish best practice solutions. This will be done through the implementation of twelve new high-reaching demonstration projects, which cover the most major aspects of innovative urban heating and cooling for a smart city. The Genoa demonstrator was designed in order to recover energy from the pressure drop between the main supply line and the city natural gas network. The potential mechanical energy is converted to electricity by a turboexpander/generator system, which has been integrated in a combined heat and power plant to supply a district heating network. The performed energy analysis assessed natural gas saving and greenhouse gas reduction achieved through the smart systems integration.

  7. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  8. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  9. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  10. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman [Consolidated Edison Company Of New York, Inc., NY (United States)

    2014-12-28

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  11. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Science.gov (United States)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  12. West Valley Demonstration Project, West Valley, New York: Annual report

    International Nuclear Information System (INIS)

    1989-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Services Center, West Valley, New York, that resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972, is to be solidified in borosilicate glass and transported to a federal repository for geologic disposal. A major milestone was reached in May 1988 when the Project began reducing the volume of the liquid high-level waste. By the end of 1988, approximately 15 percent of the initial inventory had been processed into two waste streams. The decontaminated low-level liquid waste is being solidified in cement. The high-level waste stream is being stored in an underground tank pending its incorporation into borosilicate glass. Four tests of the waste glass melter system were completed. These tests confirmed equipment operability, control system reliability, and provided samples of waste glass for durability testing. In mid-1988, the Department validated an integrated cost and schedule plan for activities required to complete the production of the waste borosilicate glass. Design of the radioactive Vitrification Facility continued

  13. Dynamic Underground Stripping Demonstration Project

    International Nuclear Information System (INIS)

    Aines, R.; Newmark, R.; McConachie, W.; Rice, D.; Ramirez, A.; Siegel, W.; Buettner, M.; Daily, W.; Krauter, P.; Folsom, E.; Boegel, A.J.; Bishop, D.; udel, K.

    1992-03-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation and underground imaging techniques for use in rapid cleanup of localized underground spills. Called ''Dynamic Stripping'' to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first 8 months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques before moving to the contaminated site in FY 92

  14. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  15. 75 FR 39492 - Major Capital Investment Projects

    Science.gov (United States)

    2010-07-09

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the date, time, and location of an...

  16. 75 FR 33757 - Major Capital Investment Projects

    Science.gov (United States)

    2010-06-15

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the dates, times, and locations of...

  17. 75 FR 55199 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-09-09

    ... customers; and 7. Workforce satisfaction. An evaluation model was developed for the Director, Defense... personnel system under an appropriate demonstration project as defined in section 342(b) of Public Law 103... satisfaction. With some modifications, this project mirrors the STRL personnel management demonstration project...

  18. 78 FR 29335 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2013-05-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal... 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD...

  19. 77 FR 69601 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2012-11-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... to demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act... the NDAA for FY 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects...

  20. The PLX- α project: demonstrating the viability of spherically imploding plasma liners as an MIF driver

    Science.gov (United States)

    Hsu, S. C.; Witherspoon, F. D.; Cassibry, J. T.; Gilmore, M.; Samulyak, R.; Stoltz, P.; the PLX-α Team

    2015-11-01

    Under ARPA-E's ALPHA program, the Plasma Liner Experiment-ALPHA (PLX- α) project aims to demonstrate the viability and scalability of spherically imploding plasma liners as a standoff, high-implosion-velocity magneto-inertial-fusion (MIF) driver that is potentially compatible with both low- and high- β targets. The project has three major objectives: (a) advancing existing contoured-gap coaxial-gun technology to achieve higher operational reliability/precision and better control/reproducibility of plasma-jet properties and profiles; (2) conducting ~ π / 2 -solid-angle plasma-liner experiments with 9 guns to demonstrate (along with extrapolations from modeling) that the jet-merging process leads to Mach-number degradation and liner uniformity that are acceptable for MIF; and (3) conducting 4 π experiments with up to 60 guns to demonstrate the formation of an imploding spherical plasma liner for the first time, and to provide empirical ram-pressure and uniformity scaling data for benchmarking our codes and informing us whether the scalings justify further development beyond ALPHA. This talk will provide an overview of the PLX- α project as well as key research results to date. Supported by ARPA-E's ALPHA program; original PLX construction supported by DOE Fusion Energy Sciences.

  1. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  2. Final Report - Navajo Electrification Demonstration Project - FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  3. The HAW project: demonstration facility for the disposal of high-level waste in salt

    International Nuclear Information System (INIS)

    Rothfuchs, T.

    1991-01-01

    This report is the so-called Synthesis report 1985-1989 of the international HAW project performed in the 800 m level of the ASSE salt mine in the Federal Republic of Germany. The major objective of this project is the pilot testing and demonstration of safe methods for the final disposal of high-level radioactive waste in geological salt-deposits. The HAW-project is carried out by the GSF-Institut fuer Tieflagerung (IFT) in cooperation with the French Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA); the Spanish Empresa Nacional de Residuos Radioactivos S.A (ENRESA) and the Netherlands Energy Research Foundation (ECN). During the years 1985 to 1989 the underground test field was excavated and after some delays in the licensing procedure, the emplacement of 30 vitrified highly radioactive canisters (containers) is now envisaged for early 1991. 32 refs; 76 figs., 11 tabs

  4. Demonstration Project. Consumer reactions to peak prices

    International Nuclear Information System (INIS)

    Lindskoug, Stefan

    2006-06-01

    The purpose and aim of the project is to look at the risk of capacity shortage in the Swedish electricity supply system during excessively cold periods of weather. A risk that has increased in recent years. A growing number of analysts emphasize the importance of high spot prices actually leading to a reduction in demand. Through increased consumer sensitivity as regards pricing, the power system can be run safely with smaller generation reserves. In addition, market price fluctuation is estimated to become more stable and predictable. The purpose of the Demonstration Project is to demonstrate methods or business concepts that lead to the demand for electricity on a national level being reduced at times of high spot prices. The need for the measures to be profitable for the parties involved is an important starting point. A general problem associated with research and development projects is that the participants feel selected and special attention is paid them, hence they will make an extra effort to improve the results. We were aware of this fact when setting up the trials, which is why we introduced the trials as an offer from the electricity supplier to take part in a commercial assessment using a new price list. For this reason we concealed the marked research aim with Elforsk as a backer. Evaluating the results of questionnaires and detailed interviews does not give cause to suppose the results are in any way affected by such conditions. The conclusion of this project is that controlling load at the customer end is an economic alternative to the investment of new production resources

  5. Learning through a portfolio of carbon capture and storage demonstration projects

    Science.gov (United States)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  6. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  7. Education & Collection Facility GSHP Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Joplin, Jeff [Denver Museum of Nature and Science, Denver, CO (United States)

    2015-03-28

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient

  8. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  9. Diesel fueled ship propulsion fuel cell demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Kumm, W.H. [Arctic Energies Ltd., Severna Park, MD (United States)

    1996-12-31

    The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The demonstrated marine propulsion of a USCG cutter will lead to commercial, naval ship and submarine applications as well as on-land applications such as diesel fueled locomotives.

  10. 34 CFR 377.1 - What is the Demonstration Projects to Increase Client Choice Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Demonstration Projects to Increase Client... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM General § 377.1 What is the Demonstration Projects to Increase Client Choice Program? The Demonstration Projects to Increase Client Choice Program is designed to...

  11. 78 FR 32637 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-05-31

    ..., Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of... DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research, Development and...

  12. Project Seahorse evolves into major marine protector | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-10-29

    Oct 29, 2012 ... Project Seahorse evolves into major marine protector ... local people, have greatly improved the prospects of survival for threatened species. ... “We tackle issues on any political level or geographical scale, according to what ...

  13. Major projects for the use of high power linacs

    International Nuclear Information System (INIS)

    Prome, M.

    1996-01-01

    A review of the major projects for high power linacs is given. The field covers the projects aiming at the transmutation of nuclear waste or the production of tritium, as well as the production of neutrons for hybrid reactors or basic research with neutron sources. The technologies which arc common to all the projects are discussed. Comments are made on the technical difficulties encountered by all the projects, and the special problems of the pulsed linacs are mentioned. Elements for a comparison of normal conducting linacs versus superconducting ones are given. Finally the technical developments being made in various laboratories are reviewed. (author)

  14. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    Science.gov (United States)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  15. Catalytic hydrotreatment of refinery waste: Demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The object of this project and report is to produce liquid hydrocarbons by the catalytic hydroprocessing of solid refinery wastes (hard pitches) in order to improve the profitability of deep conversion processes and reduce the excess production of heavy fuels. The project was mostly carried out on the ASVAHL demonstration platform site, at Solaize, and hard pitches were produced primarily by deasphalting of atmospheric or vacuum distillation residues. The project includes two experimental phases and an economic evaluation study phase. In Phase 1, two granular catalysts were used to transform pitch into standard low sulfur fuel oil: a continuously moving bed, with demetallation and conversion catalyst; a fixed bed, with hydrorefining catalyst. In Phase 2 of the project, it was proven that a hydrotreatment process using a finely dispersed catalyst in the feedstock, can, under realistic operating conditions, transform with good yields hard pitch into distillates that can be refined through standard methods. In Phase 3 of the project, it was shown that the economics of such processes are tightly linked to the price differential between white'' and black'' oil products, which is expected to increase in the future. Furthermore, the evolution of environmental constraints will impel the use of such methods, thus avoiding the coproduction of polluting solid residues. 11 figs., 1 tab.

  16. NRC assessment of the Department of Energy annealing demonstration project

    International Nuclear Information System (INIS)

    Jackson, D.A.; Malik, S.N.

    1997-01-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner's Group, Consumers Power, Electricite' de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project

  17. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  18. 78 FR 64204 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-10-28

    ... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research (ONR); Amendment... ONR Personnel Management Demonstration Project (75 FR 77380-77447, December 10, 2010). SUMMARY: On December 10, 2010 (75 FR 77380-77447), DoD published a notice of approval of a personnel management...

  19. MAJOR PROJECTS THAT INFLUENCE WORLD TRADE

    Directory of Open Access Journals (Sweden)

    GEORGE CORNEL DUMITRESCU

    2014-11-01

    Full Text Available In 1869, with the opening of the Suez Canal, world trade entered a new era of development. The commercial routes linking the Far East to the western countries were shortened considerably as compared to the maritime corridor around the Cape of Good Hope. In 1914, the opening of the Panama Canal sealed the new deal in world trade, opening for business the shortest commercial routes around the world. After 145 years from the inauguration of the Suez Canal, world trade is on the eve of a new expansion. Two major projects: the expansion of both the Suez and Panama canals, planned to be completed in the next two years, will double their transit capacity. This paper does a comparative analysis of these two strategic projects, underlining the main benefits for Egypt, Panama and world trade, based on the available statistical data, reports and literature in the field.

  20. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Vance, R.F. [West Valley Nuclear Services Co., Inc., NY (United States)

    1995-02-01

    The West Valley Demonstration Project was established by Public Law 96-368, the {open_quotes}West Valley Demonstration Project Act, {close_quotes} on October 1, l980. Under this act, Congress directed the Department of Energy to carry out a high level radioactive waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The purpose of this project is to demonstrate solidification techniques which can be used for preparing high level radioactive waste for disposal. In addition to developing this technology, the West Valley Demonstration Project Act directs the Department of Energy to: (1) develop containers suitable for permanent disposal of the high level waste; (2) transport the solidified high level waste to a Federal repository; (3) dispose of low level and transuranic waste produced under the project; and (4) decontaminate and decommission the facilities and materials associated with project activities and the storage tanks originally used to store the liquid high level radioactive waste. The process of vitrification will be used to solidify the high level radioactive liquid wastes into borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems which are used in the vitrification process.

  1. Dynamic wall demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Nakatsui, L.; Mayhew, W.

    1990-12-01

    The dynamic wall concept is a ventilation strategy that can be applied to a single family dwelling. With suitable construction, outside air can be admitted through the exterior walls of the house to the interior space to function as ventilation air. The construction and performance monitoring of a demonstration house built to test the dynamic wall concept in Sherwood Park, Alberta, is described. The project had the objectives of demonstrating and assessing the construction methods; determining the cost-effectiveness of the concept in Alberta; analyzing the operation of the dynamic wall system; and determining how other components and systems in the house interact with the dynamic wall. The exterior wall construction consisted of vinyl siding, spun-bonded polyolefin-backed (SBPO) rigid fiberglass sheathing, 38 mm by 89 mm framing, fiberglass batt insulation and 12.7 mm drywall. The mechanical system was designed to operate in the dynamic (negative pressure) mode, however flexibility was provided to allow operation in the static (balanced pressure) mode to permit monitoring of the walls as if they were in a conventional house. The house was monitored by an extensive computerized monitoring system. Dynamic wall operation was dependent on pressure and temperature differentials between indoor and outdoor as well as wind speed and direction. The degree of heat gain was found to be ca 74% of the indoor-outdoor temperature differential. Temperature of incoming dynamic air was significantly affected by solar radiation and measurement of indoor air pollutants found no significant levels. 4 refs., 34 figs., 11 tabs.

  2. Radiological incident preparedness for community hospitals: a demonstration project.

    Science.gov (United States)

    Jafari, Mary Ellen

    2010-08-01

    In November 2007, the Wisconsin Division of Public Health Hospital Disaster Preparedness Program State Expert Panel on Radiation Emergencies issued a report titled The Management of Patients in a Radiological Incident. Gundersen Lutheran Health System was selected to conduct a demonstration project to implement the recommendations in that report. A comprehensive radiological incident response plan was developed and implemented in the hospital's Trauma and Emergency Center, including the purchase and installation of radiation detection and identification equipment, staff education and training, a tabletop exercise, and three mock incident test exercises. The project demonstrated that the State Expert Panel report provides a flexible template that can be implemented at community hospitals using existing staff for an approximate cost of $25,000.

  3. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  4. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  5. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2011-03-07

    ... customers; and 7. Workforce satisfaction with the personnel management system. An evaluation model was... personnel system under an appropriate demonstration project as defined in section 342(b) of Public Law 103... was deleted with the actual construct of pay pools to be further defined in the Demonstration Project...

  6. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  7. Nuclear Desalination Demonstration Project (NDDP) in India

    International Nuclear Information System (INIS)

    Tewari, P.K.; Misra, B.M.

    2001-01-01

    In order to gainfully employ the years of experience and expertise in various aspects of desalination activity, BARC (India) has undertaken installation of a hybrid nuclear desalination plant coupled to 170 MW(e) PHWR station at Kalpakkam, Chennai in the Southeast coast of India. The integrated system, called the Nuclear Desalination Demonstration Project (NDDP), will thus meet the dual needs of process water for nuclear power plant and drinking water for the neighbouring people. NDDP aims for demonstrating the safe and economic production of good quality water by nuclear desalination of seawater. It comprises a 4500 m 3 /d Multistage Flash (MSF) and a 1800 m 3 /d Reverse Osmosis (RO) plant. MSF section uses low pressure steam from Madras Atomic Power Station (MAPS), Kalpakkam. The objectives of the NDDP (Kalpakkam) are as follows: to establish the indigenous capability for the design, manufacture, installation and operation of nuclear desalination plants; to generate necessary design inputs and optimum process parameters for large scale nuclear desalination plant; to serve as a demonstration project to IAEA welcoming participation from interested member states. The hybrid plant is envisaged to have a number of advantages: a part of high purity desalted water produced from MSF plant will be used for the makeup demineralised water requirement (after necessary polishing) for the power station; blending of the product water from RO and MSF plants would provide requisite quality drinking water; the RO plant will continue to be operated to provide the water for drinking purposes during the shutdown of the power station

  8. Brown Grease to Biodiesel Demonstration Project Report

    Energy Technology Data Exchange (ETDEWEB)

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount

  9. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures

  11. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  12. Successful Control of Major Project Budgets

    Directory of Open Access Journals (Sweden)

    Steen Lichtenberg

    2016-07-01

    Full Text Available This paper differs from scientific papers describing current research. In line with the theme of this special issue, it challenges conventional risk management practice against the background of former research results successfully finished decades ago. It is well-known that conventional practice frequently results in budget overruns of large projects. International reviews document that. Severe delays of schedules are also well-known. This paper describes successful research results from almost three decades ago, which successfully challenges this severe problem and has led to new practices. The research involved is an unusual mix: Scandinavian researchers from psychology, statistical theory and engineering economy. The resulting procedure has been widely used since around 1990 and challenges conventional procedures. The procedure is documented to be able to yield statistically correct prognoses, when the “rules of the game” have been correctly followed. After a short summary of the basic situation, this paper summarizes the research, followed by some resulting experiences, focusing on two recent studies each of 40 infrastructures and other major projects. In both sets, the actual final cost largely equaled the expected project cost. This result is a marked change from international past and present experience. Finally, the need for further research and progress is discussed.

  13. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2001-01-01

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO(sub 2) emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO(sub 2) removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge

  14. HyLights: Preparation of the Large-Scale Demonstration Projects on Hydrogen for Transport in Europe

    International Nuclear Information System (INIS)

    Ulrich Bunger; Volker Blandow; Volker Jaensch; Harm Jeeninga; Cristina Morte Gomez

    2006-01-01

    The strategically important project HyLights has been launched by the European Commission in preparation of the large scale demonstration projects in transition to hydrogen as a fuel and long-term renewable energy carrier. HyLights, monitors concluded/ongoing demonstration projects and assists the planning of the next demonstration project phase, putting a clear focus on hydrogen in transport. HyLights is a coordination action that comprises 5 tasks to: 1) develop an assessment framework for concluded/ongoing demonstration projects, 2) analyse individual projects and establish a project database, 3) carry out a gaps analysis and prepare a requirement profile for the next stage projects, 4) assess and identify necessary financial and legal steps in preparation of the new projects, and 5) develop a European Initiative for the Growth of Hydrogen for Transport (EIGHT). (authors)

  15. Stakeholder views on financing carbon capture and storage demonstration projects in China.

    Science.gov (United States)

    Reiner, David; Liang, Xi

    2012-01-17

    Chinese stakeholders (131) from 68 key institutions in 27 provinces were consulted in spring 2009 in an online survey of their perceptions of the barriers and opportunities in financing large-scale carbon dioxide capture and storage (CCS) demonstration projects in China. The online survey was supplemented by 31 follow-up face-to-face interviews. The National Development and Reform Commission (NDRC) was widely perceived as the most important institution in authorizing the first commercial-scale CCS demonstration project and authorization was viewed as more similar to that for a power project than a chemicals project. There were disagreements, however, on the appropriate size for a demonstration plant, the type of capture, and the type of storage. Most stakeholders believed that the international image of the Chinese Government could benefit from demonstrating commercial CCS and that such a project could also create advantages for Chinese companies investing in CCS technologies. In more detailed interviews with 16 financial officials, we found striking disagreements over the perceived risks of demonstrating CCS. The rate of return seen as appropriate for financing demonstration projects was split between stakeholders from development banks (who supported a rate of 5-8%) and those from commercial banks (12-20%). The divergence on rate alone could result in as much as a 40% difference in the cost of CO(2) abatement and 56% higher levelized cost of electricity based on a hypothetical case study of a typical 600-MW new build ultrasupercritical pulverized coal-fired (USCPC) power plant. To finance the extra operational costs, there were sharp divisions over which institutions should bear the brunt of financing although, overall, more than half of the support was expected to come from foreign and Chinese governments.

  16. AN OPTICAL CHARACTER RECOGNITION RESEARCH AND DEMONSTRATION PROJECT.

    Science.gov (United States)

    1968

    RESEARCH AND DEVELOPMENT OF PROTOTYPE LIBRARY SYSTEMS WHICH UTILIZE OPTICAL CHARACTER RECOGNITION INPUT HAS CENTERED AROUND OPTICAL PAGE READERS AND DOCUMENT READERS. THE STATE-OF-THE-ART OF BOTH THESE OPTICAL SCANNERS IS SUCH THAT BOTH ARE ACCEPTABLE FOR LIBRARY INPUT PREPARATION. A DEMONSTRATION PROJECT UTILIZING THE TWO TYPES OF READERS, SINCE…

  17. Business Cases for Major Public Infrastructure Projects in Canada

    Directory of Open Access Journals (Sweden)

    Mario Iacobacci

    2017-11-01

    Full Text Available When governments announce that they are going to spend vast sums of taxpayers’ money on a new public infrastructure project, you can be certain they will praise all the terrific new benefits that the project will bring to citizens, making everyone’s life easier, safer, greener and better. But this does not tell us whether we are better off as a society, after accounting for the cost of these projects borne by taxpayers today and well into the future. In reality, there is a meaningful risk that a project undertaken without a proper business case could end up making citizens’ lives worse. That new commuter train might look sleek and shiny and seem convenient for some, but a close business case analysis of recent transit projects in Canada’s three largest cities suggests that in as many as four cases out of 21 projects, the burden of paying for the projects does not justify the public investment. In a review of thirteen recent public transit projects in the Greater Toronto and Hamilton Area (GTHA, at least three projects had benefits that fell short of the costs. Yet, all three projects went ahead (or have been funded. Only one project showed large net benefits for citizens once all considerations were accounted for. Three projects showed small net benefits – of a size that can be easily offset by a modest cost over-run. The six remaining projects did not have any publicly available business cases. In the Greater Montreal area, a review of three recent major transit projects turned up no evidence of a publicly available business case for any of them. As a result, Montrealers are in the dark as to how much benefit or value destruction the three projects are responsible for. Things are far more encouraging in Vancouver, however, where three out of the five major transit projects undertaken or funded in recent years were backed by business cases showing a net benefit. Only one project did not show a net benefit and one project did not have a

  18. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  19. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  20. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  1. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 8 discusses Control System SOT Tests Results and Analysis Report. This is a continuation of Book 7

  2. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  3. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    International Nuclear Information System (INIS)

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  4. Projeto demonstrativo em epilepsia no Brasil National demonstration project on epilepsy in Brazil

    Directory of Open Access Journals (Sweden)

    Li Li Min

    2003-03-01

    Full Text Available A epilepsia é a condição neurológica grave de maior prevalência no mundo. Infelizmente, a maioria dos pacientes com epilepsia nos países em desenvolvimento não recebem tratamento adequado e sofrem estigmatização pelo diagnóstico. Diante deste cenário, em 1997 foi lançada uma Campanha Global Contra Epilepsia liderada pela Organização Mundial da Saúde, a Internacional League Against Epilepsy, e International Bureau for Epilepsy. A Campanha entrou na sua segunda fase em 2001 com os projetos demonstrativos que estão em curso na China, Zimbábue, Senegal e recentemente no Brasil. A finalidade do projeto demonstrativo é mostrar através de avaliação metodológica que é possível estabelecer um modelo de atendimento integral aos pacientes com epilepsia. O projeto demonstrativo brasileiro tem como regiões de atuação Campinas e São José de Rio Preto. Uma Task Force foi instituída para estudar a expansão da atuação para outras áreas do país.Epilepsy is the most prevalent non-communicable serious neurological condition worldwide. Unfortunately, the majority of people with epilepsy in low-income countries do not receive appropriate treatment. Stigmatisation is the rule. In this setting, the World Health Organisation, the International League against Epilepsy and the International Bureau for Epilepsy launched the Global Campaign against Epilepsy in 1997. This entered its second phase in 2001 and as part of it has set up demonstration projects in the People's Republic of China, Zimbabwe, Senegal and, more recently, in Brazil. The objective of the demonstration projects is to show, through methodological evaluation, that it is possible to establish a model of treatment for people with epilepsy in primary health care settings. The Brazilian demonstration project has targeted regions in Campinas and São Jose do Rio Preto, both in Sao Paulo State. A task force has been established to assess strategies to expand this project

  5. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    Science.gov (United States)

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  6. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, Dale [Missouri Soybean Association, Jefferson City, MO (United States); Hamilton, Jill [Sustainable Energy Strategies, Inc., Fairfax, VA (United States)

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  7. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    International Nuclear Information System (INIS)

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98

  8. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  9. The Plasma Hearth Process demonstration project for mixed waste treatment

    International Nuclear Information System (INIS)

    Geimer, R.; Dwight, C.; McClellan, G.

    1994-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Integrated Program (MWIP). Testing to date has yielded encouraging results in displaying potential applications for the PHP technology. Early tests have shown that a wide range of waste materials can be readily processed in the PHP and converted to a vitreous product. Waste materials can be treated in their original container as received at the treatment facility, without pretreatment. The vitreous product, when cooled, exhibits excellent performance in leach resistance, consistently exceeding the Environmental Protection Agency (EPA) Toxicity Characteristic Leaching Procedure (TCLP) requirements. Performance of the Demonstration System during test operations has been shown to meet emission requirements. An accelerated development phase, being conducted at both bench- and pilot-scale on both nonradioactive and radioactive materials, will confirm the viability of the process. It is anticipated that, as a result of this accelerated technology development and demonstration phase, the PHP will be ready for a final field-level demonstration within three years

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports

  11. Latest Changes to NASA's Laser Communication Relay Demonstration Project

    Science.gov (United States)

    Edwards, Bernard L.; Israel, David J.; Vithlani, Seema K.

    2018-01-01

    Over the last couple of years, NASA has been making changes to the Laser Communications Relay Demonstration Project (LCRD), a joint project between NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). The changes made makes LCRD more like a future Earth relay system that has both high speed optical and radio frequency links. This will allow LCRD to demonstrate a more detailed concept of operations for a future operational mission critical Earth relay. LCRD is expected to launch in June 2019 and is expected to be followed a couple of years later with a prototype user terminal on the International Space Station. LCRD's architecture will allow it to serve as a testbed in space and this paper will provide an update of its planned capabilities and experiments.

  12. Rod consolidation at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Bailey, W.J.

    1986-12-01

    A rod consolidation demonstration with irradiated pressurized water reactor fuel was recently conducted by personnel from Nuclear Assurance Corporation and West Valley Nuclear Services Company at the West Valley Demonstration Project in West Valley, New York. The rod consolidation demonstration involved pulling all of the fuel rods from six fuel Assemblies. In general, the rod pulling proceeded smoothly. The highest compaction ratio attained was 1:8:1. Among the total of 1074 fuel rods were some known degraded rods (they had collapsed cladding, a result of in-reactor fuel densification), but no rods were broken or dropped during the demonstration. One aim was to gather information on the effect of rod consolidation operations on the integrity of the fuel rods during subsequent handling and storage. Another goal was to collect information on the condition and handling of intact, damaged, and failed fuel that has been in storage for an extended period. 9 refs., 8 figs., 1 tab

  13. Hydrogen fueling stations in Japan hydrogen and fuel cell demonstration project

    International Nuclear Information System (INIS)

    Koseki, K.; Tomuro, J.; Sato, H.; Maruyama, S.

    2004-01-01

    A new national demonstration project of fuel cell vehicles, which is called Japan Hydrogen and Fuel Cell Demonstration Project (JHFC Project), has started in FY2002 on a four-year plan. In this new project, ten hydrogen fueling stations have been constructed in Tokyo and Kanagawa area in FY2002-2003. The ten stations adopt the following different types of fuel and fueling methods: LPG reforming, methanol reforming, naphtha reforming, desulfurized-gasoline reforming, kerosene reforming, natural gas reforming, water electrolysis, liquid hydrogen, by-product hydrogen, and commercially available cylinder hydrogen. Approximately fifty fuel cell passenger cars and a fuel cell bus are running on public roads using these stations. In addition, two hydrogen stations will be constructed in FY2004 in Aichi prefecture where The 2005 World Exposition (EXPO 2005) will be held. The stations will service eight fuel cell buses used as pick-up buses for visitors. We, Engineering Advancement Association of Japan (ENAA), are commissioned to construct and operate a total of twelve stations by Ministry of Economy Trade and Industry (METI). We are executing to demonstrate or identify the energy-saving effect, reduction of the environmental footprint, and issues for facilitating the acceptance of hydrogen stations on the basis of the data obtained from the operation of the stations. (author)

  14. Nucla circulating atmospheric fluidized bed demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Keith, Raymond E.

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  15. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  16. WBP: The wood Brazilian BIG-GT demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Carpentieri, E. [Companhia Hidro Eletrica do Sao Francisco, Recife (Brazil)

    1993-12-31

    Brazil is one of the leading countries in the use of renewable energy. Most of its electricity comes from hydro power, about 200,000 barrels a day of ethanol from sugar cane is used as fuel, around 38% of the pig iron, and 20% of the steel production, uses charcoal as a reducing medium. Located in the tropics, with the sun shining all year round, and with its vast territory, the Country may be regarded as having all the basic conditions to develop a modern Biomass for Electricity industry. The conjunction of those characteristics with, the necessity of developing new energy resources for electricity production in the Northeast of the Country, the results of the studies made by Princeton University, Shell and Chesf, the progress achieved by the BIG-GT (Biomass Integrated Gasification Gas Turbine) technology in Europe, and the organization of the Global Environment Facility (GEF), provided the unique opportunity for the implementation of a commercial demonstration in Brazil. This paper describes the idea, the scope, the technical challenges, and actual status of development of the WBP, a project which aims to demonstrate the commercial viability of the BIG-GT technology. It also highlights, the project management structure, the role of the GEF, World Bank and of the United Nations Development Program (UNDP), and the participation of the Brazilian Federal Government, through the Ministry of Science and Technology (MCT). Finally it describes the Participants (ELETROBRAS, CVRD, CIENTEC, SHELL, and CHESF), their role in the project, and how the group was formed and operates.

  17. Demonstrating the sealing of a deep geologic repository: the RECAP project

    International Nuclear Information System (INIS)

    Kuzyk, G.W.; Dixon, D.A.; Martino, J.B.; Kozak, E.T.; Bilinsky, D.M.; Thompson, P.M.

    2006-01-01

    Atomic Energy of Canada Limited (AECL) has operated an Underground Research Laboratory (URL) for twenty-three years (1982-2005). The URL was designed and constructed to carry out in situ geotechnical R and D needed for the Canadian Nuclear Fuel Waste Management program. The facility is now being closed, the final of several phases that have included siting, site evaluation, construction and operation. The closure phase presents a unique opportunity to develop and demonstrate the methodologies needed for closure and site restoration of a deep geologic repository for used nuclear fuel. A wealth of technical background and characterization data, dating back to before the first excavation work was carried out, are available to support closure activities. A number of closure-related activities are being proposed as part of a REpository Closure And Post-closure (RECAP) project. The RECAP project is proposed to include demonstrations of shaft and borehole sealing and monitoring as well as fracture sealing (grouting), room closure and monitoring system decommissioning, all activities that would occur when closing an actual repository. In addition to the closure-related activities, the RECAP project could provide a unique opportunity to conduct intrusion-monitoring demonstrations as part of a repository safeguards demonstration. (author)

  18. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  19. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  20. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  1. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Science.gov (United States)

    2011-12-27

    ... care including minor illness or injury for Active Duty Family Members enrolled in TRICARE Prime or.... Current data indicates that the ADFMs frequently need urgent care while traveling to new duty stations for... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Prime Urgent Care Demonstration Project...

  2. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  3. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Science.gov (United States)

    2010-04-01

    ... administration of the SSI program. These projects will test the advantages of altering certain requirements... demonstration project will have a termination date (up to 10 years from the start of the project). [48 FR 7576...

  4. New capacity and the status of major projects

    International Nuclear Information System (INIS)

    Osborne, R.; Eastman, P.; Bajc, F.; Hawthorne, D.

    2003-01-01

    This session included highlights from from four guest speakers who were asked to comment on new electricity capacity in Ontario and the status of major projects. The summer of 2002 was one of the hottest on record in Ontario and presented a challenge for suppliers of electricity to meet demand. Some of the extra demand was met by interties. Imports provided 5 per cent of consumption in July and 8 per cent in August. TransAlta and ATCO are currently involved in 2 major projects to add generation capacity. In addition, Ontario Power Generation is getting more production from its existing nuclear plants and has made significant investment to get greater efficiency and increase safety margins at the plants. One panelist suggested that nuclear power is a key part of meeting Canada's Kyoto greenhouse reduction obligations. It was emphasized that market participants should allow time to let the market work and let a free market respond to price signals. It was argued that consumers expect and rely too much on low-cost electricity and are therefore not encouraged to conserve energy or look into new generation requirements. figs

  5. Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Steve Bergin

    2005-10-14

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

  6. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Science.gov (United States)

    2011-03-04

    ... parties of a Military Health System (MHS) Demonstration project under the authority of Title 10, U.S. Code... of Service (POS) deductibles and cost shares shall apply to these four unmanaged visits. Additionally... TRICARE authorized provider or UCC without incurring POS deductibles and cost shares. The ADSM and family...

  7. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  8. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  9. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false State systems under demonstration projects..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State... approval of a State system are met under § 403.304 (b)(1)-(10) and § 403.304(c), and, if appropriate § 403...

  10. 78 FR 78342 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF DEFENSE Office of the Secretary Extension of Autism Services Demonstration Project... (the Department) Enhanced Access to Autism Services Demonstration Project (Autism Demonstration) under the Extended Care Health Option (ECHO) for beneficiaries diagnosed with an Autism Spectrum Disorder...

  11. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Andre L. Boehman; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The laboratory studies have included work with a Navistar V-8 turbodiesel engine, demonstration of engine operation on DME-diesel blends and instrumentation for evaluating fuel properties. The field studies have involved performance, efficiency and emissions measurements with the Champion Motorcoach ''Defender'' shuttle bus which will be converted to DME-fueling. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have completed engine combustion studies on DME-diesel blends up to 30 wt% DME addition.

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. 75 FR 8927 - Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended Care Health...

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF DEFENSE Office of the Secretary Autism Services Demonstration Project for TRICARE... Access to Autism Services Demonstration Project under the Extended Care Health Option for beneficiaries diagnosed with an Autism Spectrum Disorder (ASD). Under the demonstration, the Department implemented a...

  14. 76 FR 80903 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2011-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Extension of Autism Services Demonstration Project... Enhanced Access to Autism Services Demonstration Project under the Extended Care Health Option for beneficiaries diagnosed with an Autism Spectrum Disorder (ASD). Under the demonstration, the Department...

  15. Project A+ Elementary Technology Demonstration Schools 1990-91. The First Year.

    Science.gov (United States)

    Marable, Paula; Frazer, Linda

    Project A+ Elementary Technology Demonstration Schools is a program made possible through grants from IBM (International Business Machines Corporation) and Apple, Inc. The primary purpose of the program is to demonstrate the educational effectiveness of technology in accelerating the learning of low achieving at-risk students and enhancing the…

  16. Ultra Low Sulfur Home Heating Oil Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Batey, John E. [Energy Research Center, Inc., Easton, CT (United States); McDonald, Roger [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  17. Demonstration project: Oxy-fuel combustion at Callide-A plant

    Energy Technology Data Exchange (ETDEWEB)

    Makino, Keiji; Misawa, Nobuhiro; Kiga, Takashi; Spero, Chris

    2007-07-01

    Oxy-fuel combustion is expected to be one of the promising systems on CO2 recovery from pulverized-coal power plant, and enable the CO2 to be captured in a more cost-effective manner compared to other CO2 recover process. An Australia-Japan consortium was established in 2004 specifically for the purpose of conducting a feasibility study on the application of oxy-fuel combustion to an existing pulverized-coal power plant that is Callide-A power plant No.4 unit at 30MWe owned by CS Energy in Australia. One of the important components in this study has been the recent comparative testing of three Australian coals under both oxy-fuel and air combustion conditions using the IHI combustion test facilities. The tests have yielded a number of important outcomes including a good comparison of normal air with oxy-fuel combustion, significant reduction in NOx mass emission rates under oxy-fuel combustion. On the basis of the feasibility study, the project under Australia-Japan consortium is now under way for applying oxy-fuel combustion to an existing plant by way of demonstration. In this project, a demonstration plant of oxy-fuel combustion will be completed by the end of 2008. This project aims at recovering CO2 from an actual power plant for storage. (auth)

  18. 75 FR 60091 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-09-29

    ... DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research, Development and... project; correction. SUMMARY: On September 9, 2010 (75 FR 55199), DoD published a notice concerning the...

  19. The role of the state in sustainable energy transitions: A case study of large smart grid demonstration projects in Japan

    International Nuclear Information System (INIS)

    Mah, Daphne Ngar-yin; Wu, Yun-Ying; Ip, Jasper Chi-man; Hills, Peter Ronald

    2013-01-01

    Smart grids represent one of the most significant evolutionary changes in energy management systems as they enable decentralised energy systems, the use of large-scale renewable energy as well as major improvements in demand-side-management. Japan is one of the pioneers in smart grid deployment. The Japanese model is characterised by a government-led, community-oriented, and business-driven approach with the launch of four large-scale smart-community demonstration projects. Our case study of large smart grid demonstration projects in Japan found that the Japanese government has demonstrated its high governing capacity in terms of leadership, recombinative capacity, institutional capacity, enabling capacity, and inducement capacity. However, the major limitations of the government in introducing some critical regulatory changes have constrained the smart grid deployment from advancing to a higher-order form of smart grid developments. This paper calls for more attention to be given to the importance of regulatory changes that are essential to overcome the technological lock-in, and the complementary roles of non-state actors such as the business sector and consumers to strengthen the governing capacity of the state. - Highlights: • Smart grids introduce evolutionary changes in energy management systems. • The Japanese model is government-led, community-oriented, and business-driven. • The Japanese government has demonstrated its high governing capacity. • But the limitations of the government have constrained the smart grid developments. • More attention needs to be given to regulatory changes and non-state actors

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  5. Dynamic underground stripping demonstration project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-04-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation techniques for rapid cleanup of localized underground spills. Called dynamic stripping to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first eight months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques. Tests then began on the contaminated site in FY 1992. This report describes the work at the Clean Site, including design and performance criteria, test results, interpretations, and conclusions. We fielded 'a wide range of new designs and techniques, some successful and some not. In this document, we focus on results and performance, lessons learned, and design and operational changes recommended for work at the contaminated site. Each section focuses on a different aspect of the work and can be considered a self-contained contribution

  6. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report

  7. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 5 discusses the following topics: Lower Cutting System Test Results and Analysis Report; NFBC Loading System Test Results and Analysis Report; Robotic Bridge Transporter Test Results and Analysis Report; RM-10A Remotec Manipulator Test Results and Analysis Report; and Manipulator Transporter Test Results and Analysis Report

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  12. Demonstration of Autonomous Rendezvous Technology (DART) Project Summary

    Science.gov (United States)

    Rumford, TImothy E.

    2003-01-01

    Since the 1960's, NASA has performed numerous rendezvous and docking missions. The common element of all US rendezvous and docking is that the spacecraft has always been piloted by astronauts. Only the Russian Space Program has developed and demonstrated an autonomous capability. The Demonstration of Autonomous Rendezvous Technology (DART) project currently funded under NASA's Space Launch Initiative (SLI) Cycle I, provides a key step in establishing an autonomous rendezvous capability for the United States. DART's objective is to demonstrate, in space, the hardware and software necessary for autonomous rendezvous. Orbital Sciences Corporation intends to integrate an Advanced Video Guidance Sensor and Autonomous Rendezvous and Proximity Operations algorithms into a Pegasus upper stage in order to demonstrate the capability to autonomously rendezvous with a target currently in orbit. The DART mission will occur in April 2004. The launch site will be Vandenburg AFB and the launch vehicle will be a Pegasus XL equipped with a Hydrazine Auxiliary Propulsion System 4th stage. All mission objectives will be completed within a 24 hour period. The paper provides a summary of mission objectives, mission overview and a discussion on the design features of the chase and target vehicles.

  13. Texas LPG fuel cell development and demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units

  14. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  15. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  16. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  17. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  18. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Science.gov (United States)

    2013-09-19

    ... B One-Step (levonorgestrel) emergency contraceptive as an over-the-counter product ``for all women...-Counter Plan B One-Step Emergency Contraceptive (levonorgestrel). (2) OTC availability of Plan B One-Step Emergency Contraceptive (levonorgestrel) through the demonstration project will be at retail dispensing...

  19. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  20. Manufacturing of cells and stacks for SOFC development, test and demonstration projects and SOFC hotbox design development

    Energy Technology Data Exchange (ETDEWEB)

    2008-09-15

    The purpose of this project is to support the continued SOFC development through manufacturing process optimization and manufacturing of SOFC cells and stacks. These cells and stacks will serve as a necessary base for the development activities and for the establishment of a number of test and demonstration activities. The manufacture will also help provide operating experience and reduce manufacturing cost. Another main focus of the manufacturing is to assure technical improvements and reliability. It is imperative to the eventual success of the technology that test and demonstration is carried out in the pre-market conditions that will exist for the next years in the three market segments targeted by TOFC (Distributed generation, micro CHP and APU incl. marine APU). Finally, the project also includes development activities focusing on the stack-system interface (hotbox design development) and on dealing with transients and start up and shut down times, which is of particular importance for APU and micro CHP applications. Three topics are addressed:1) Cell manufacture, including production development, capacity lift and manuf. of cells for test and demonstration; 2) Stack manufacture and test, including a test facility, stack manuf. and test of stacks in a system at HCV; 3) Hotbox design development, including design, prototype construction and testing. The progress of this project is documented. Major achievements are successful manufacture of adequate amounts of cells and stacks according to the application. Furthermore significant over-performance in design, construction and test of a methanol based hotbox prototype as well as publication of this. (au)

  1. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    Science.gov (United States)

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  2. 76 FR 56406 - Science and Technology Reinvention Laboratory Demonstration Project; Department of the Army; Army...

    Science.gov (United States)

    2011-09-13

    ... DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology Reinvention Laboratory Demonstration Project; Department of the Army; Army Research, Development and Engineering Command; Tank... personnel management demonstration project for eligible TARDEC employees. Within that notice the table...

  3. Common Market measures to promote the use of solar energy - The demonstration project

    Science.gov (United States)

    Kaut, W.

    A series of solar technical projects being conducted under the auspices of the Common Market is discussed. The history and legal foundations of this demonstration project, previous proposal requests and their results, and the experiences to date and present status of the project are assessed. Twenty-six projects proposals are being funded; the only German one concerns solar heating of swimming pools. The economic and administrative aspects of these projects are detailed. Problems of the project are discussed, including the allocation of funds between older and newer aspects and financial constraints.

  4. North Village Ground Source Heat Pump Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  5. Task 27 -- Alaskan low-rank coal-water fuel demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the project, and outline a market development plan for meeting those objectives.

  6. Toward Elimination of Dog-Mediated Human Rabies: Experiences from Implementing a Large-scale Demonstration Project in Southern Tanzania.

    Science.gov (United States)

    Mpolya, Emmanuel Abraham; Lembo, Tiziana; Lushasi, Kennedy; Mancy, Rebecca; Mbunda, Eberhard M; Makungu, Selemani; Maziku, Matthew; Sikana, Lwitiko; Jaswant, Gurdeep; Townsend, Sunny; Meslin, François-Xavier; Abela-Ridder, Bernadette; Ngeleja, Chanasa; Changalucha, Joel; Mtema, Zacharia; Sambo, Maganga; Mchau, Geofrey; Rysava, Kristyna; Nanai, Alphoncina; Kazwala, Rudovick; Cleaveland, Sarah; Hampson, Katie

    2017-01-01

    A Rabies Elimination Demonstration Project was implemented in Tanzania from 2010 through to 2015, bringing together government ministries from the health and veterinary sectors, the World Health Organization, and national and international research institutions. Detailed data on mass dog vaccination campaigns, bite exposures, use of post-exposure prophylaxis (PEP), and human rabies deaths were collected throughout the project duration and project areas. Despite no previous experience in dog vaccination within the project areas, district veterinary officers were able to implement district-wide vaccination campaigns that, for most part, progressively increased the numbers of dogs vaccinated with each phase of the project. Bite exposures declined, particularly in the southernmost districts with the smallest dog populations, and health workers successfully transitioned from primarily intramuscular administration of PEP to intradermal administration, resulting in major cost savings. However, even with improved PEP provision, vaccine shortages still occurred in some districts. In laboratory diagnosis, there were several logistical challenges in sample handling and submission but compared to the situation before the project started, there was a moderate increase in the number of laboratory samples submitted and tested for rabies in the project areas with a decrease in the proportion of rabies-positive samples over time. The project had a major impact on public health policy and practice with the formation of a One Health Coordination Unit at the Prime Minister's Office and development of the Tanzania National Rabies Control Strategy, which lays a roadmap for elimination of rabies in Tanzania by 2030 by following the Stepwise Approach towards Rabies Elimination (SARE). Overall, the project generated many important lessons relevant to rabies prevention and control in particular and disease surveillance in general. Lessons include the need for (1) a specific unit in the

  7. Medium Duty Electric Vehicle Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Mackie, Robin J. D. [Smith Electric Vehicles Corporation, Kansas City, MO (United States)

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  8. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  9. Wood to Bio-Methane demonstration project in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Van der Meijden, C.M.; Van der Drift, A.; Rietveld, G. [ECN Biomass and Energy Efficiency, Petten (Netherlands); Koenemann, J.W. [Dahlman Renewable Technology, P.O. Box 438, 3140 AK Maassluis (Netherlands); Sierhuis, W. [HVCgroup, P.O. Box 9199, 1800 GD, Alkmaar (Netherlands)

    2013-06-15

    The Energy research Centre of the Netherlands (ECN) has developed a biomass gasification technology, called the MILENA technology. The Milena gasification technology has a high cold gas efficiency and high methane yield, making it very suitable for gas engine and turbine applications as well as upgrading of the gas into Bio-Methane. An overall efficiency from biomass to power of over 30% is possible, whereas 70% efficiency is achievable from biomass to gas grid quality methane. HVC Group (situated in Alkmaar, North Holland) is a modern public service waste company. HVC converts waste streams which cannot be recycled into usable forms of energy. HVC has a 75 MWth waste wood boiler in operation which produces heat and electricity, and an anaerobic digester which converts domestic fruit, vegetable and garden waste into Bio-Methane. HVC expects an important role for Bio-Methane in the future and HVC has decided to join ECN with the development, demonstration and implementation of the MILENA Bio-Methane technology. Linked to the Bio-Methane demonstration project is the Netherlands Expertise Centre for Biomass Gasification. The MILENA demonstration project and the Gasification Expert Centre are supported by the following companies and organizations: HVC, TAQA, Gasunie, Dahlman, province of North Holland, the Alkmaar municipality and ECN. In 2010 and 2012 extensive lab-scale and pilot scale tests have been executed by ECN and HVC to proof that the gasification and gas cleaning technology is ready for commercial application. The final step in this test program was a duration test in the 800 kWth MILENA pilot plant coupled to the OLGA tar removal unit. The goal was to show high availability. The result of the test was an availability of the gasifier of 96% and an overall availability (including gas cooling and gas cleaning) of 85%. The results of the duration tests convinced HVC and the other partners that the technology is ready for scale-up. The results produced in the

  10. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  11. Cleanup criteria for the West Valley demonstration project

    International Nuclear Information System (INIS)

    Parrott, J.D.

    1999-01-01

    The US Nuclear Regulatory Commission (NRC) is prescribing decontamination and decommissioning (cleanup) criteria for the West Valley Demonstration Project and the West Valley, New York, site. The site is contaminated with various forms of residual radioactive contamination and contains a wide variety of radioactive waste. The NRC is planning to issue cleanup criteria for public comment in Fall 1999. Due to the complexity of the site, and the newness of NRC's cleanup criteria policy, applying NRC's cleanup criteria to this site will be an original regulatory undertaking. (author)

  12. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  13. Final project report for NEET pulsed ion beam project

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, S. O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-11

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurement of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.

  14. A Day in the Life of the Laser Communications Relay Demonstration Project

    Science.gov (United States)

    Edwards, Bernard; Israel, David; Caroglanian, Armen; Spero, James; Roberts, Tom; Moores, John

    2016-01-01

    This paper provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the groundwork for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications' potential to meet NASA's growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

  15. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  16. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  18. The Fort McMurray Demonstration Project in Social Marketing: theory, design, and evaluation.

    Science.gov (United States)

    Guidotti, T L; Ford, L; Wheeler, M

    2000-02-01

    The Fort McMurray Demonstration Project in Social Marketing is a multifaceted program that applies the techniques of social marketing to health and safety. This paper describes the origins of the project and the principles on which it was based. VENUE: Fort McMurray, in the province of Alberta, Canada, was selected because the community had several community initiatives already underway and the project had the opportunity to demonstrate "value added." The project is distinguished from others by a model that attempts to achieve mutually reinforcing effects from social marketing in the community as a whole and from workplace safety promotion in particular. Specific interventions sponsored by the project include a media campaign on cable television, public activities in local schools, a community safety audit, and media appearance by a mascot that provides visual identity to the project, a dinosaur named "Safetysaurus." The project integrated its activities with other community initiatives. The evaluation component emphasizes outcome measures. A final evaluation based on injury rates and attitudinal surveys is underway. Baseline data from the first round of surveys have been compiled and published. In 1995, Fort McMurray became the first city in North America to be given membership in the World Health Organization's Safe Community Network.

  19. MODIL cryocooler producibility demonstration project results

    International Nuclear Information System (INIS)

    Cruz, G.E.; Franks, R.M.

    1993-01-01

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustively tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss observations regarding Industry's current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL's Phase I producibility demonstration project is presented

  20. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  1. Wave Power Demonstration Project at Reedsport, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Downie, Bruce [Project Manager

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  2. Modelling and Simulation of National Electronic Product Code Network Demonstrator Project

    Science.gov (United States)

    Mo, John P. T.

    The National Electronic Product Code (EPC) Network Demonstrator Project (NDP) was the first large scale consumer goods track and trace investigation in the world using full EPC protocol system for applying RFID technology in supply chains. The NDP demonstrated the methods of sharing information securely using EPC Network, providing authentication to interacting parties, and enhancing the ability to track and trace movement of goods within the entire supply chain involving transactions among multiple enterprise. Due to project constraints, the actual run of the NDP was 3 months only and was unable to consolidate with quantitative results. This paper discusses the modelling and simulation of activities in the NDP in a discrete event simulation environment and provides an estimation of the potential benefits that can be derived from the NDP if it was continued for one whole year.

  3. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

    2009-09-09

    Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

  4. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  5. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  6. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  7. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  8. Large-scale decontamination and decommissioning technology demonstration project at a former uranium metal production facility

    International Nuclear Information System (INIS)

    Martineit, R.A.; Borgman, T.D.; Peters, M.S.; Stebbins, L.L.

    1997-01-01

    The Department of Energy's (DOE) Office of Science and Technology Decontamination and Decommissioning (D ampersand D) Focus Area, led by the Federal Energy Technology Center, has been charged with improving upon baseline D ampersand D technologies with the goal of demonstrating and validating more cost-effective and safer technologies to characterize, deactivate, survey, decontaminate, dismantle, and dispose of surplus structures, buildings, and their contents at DOE sites. The D ampersand D Focus Area's approach to verifying the benefits of the improved D ampersand D technologies is to use them in large-scale technology demonstration (LSTD) projects at several DOE sites. The Fernald Environmental Management Project (FEMP) was selected to host one of the first three LSTD's awarded by the D ampersand D Focus Area. The FEMP is a DOE facility near Cincinnati, Ohio, that was formerly engaged in the production of high quality uranium metal. The FEMP is a Superfund site which has completed its RUFS process and is currently undergoing environmental restoration. With the FEMP's selection to host an LSTD, the FEMP was immediately faced with some challenges. The primary challenge was that this LSTD was to be integrated into the FEMP's Plant 1 D ampersand D Project which was an ongoing D ampersand D Project for which a firm fixed price contract had been issued to the D ampersand D Contractor. Thus, interferences with the baseline D ampersand D project could have significant financial implications. Other challenges include defining and selecting meaningful technology demonstrations, finding/selecting technology providers, and integrating the technology into the baseline D ampersand D project. To date, twelve technologies have been selected, and six have been demonstrated. The technology demonstrations have yielded a high proportion of open-quotes winners.close quotes All demonstrated, technologies will be evaluated for incorporation into the FEMP's baseline D ampersand D

  9. Staunton 1 Reclamation Demonstration Project. Progress report for 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation, soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.

  10. Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

    1980-12-01

    A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

  11. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  12. Major infrastructure projects and the foreign policy of the Baltic states in 2010—2014

    Directory of Open Access Journals (Sweden)

    Mezhevich N. M.

    2014-02-01

    Full Text Available At the current stage of social development, particular attention is drawn to studies that assess major infrastructure — and thus political — projects aimed at a qualitative breakthrough in the socio-economic development of the countries under investigation. The scheduled multi-billion investments into energy sector are of political rather than economic nature. The projects to develop alternative power grids and high-speed railways can result in large-scale economic downturns diminishing the prospects of balanced social development. The author addresses the classical concepts of the theory of regional economy and new economic geography and their interpretation of the interconnection between political and economic factors. The article aims to demonstrate the inconsistency between political and economic objectives of the development of the Baltics. The study contributes to a broader set of research into the issues of post-Soviet economic and political development. The Baltic States follow their own political and economic ways. The study proves the hypothesis of low efficiency of large infrastructure project and their political motivation. It is concluded that the disregard of the factor of mutually beneficial economic cooperation with Russia destabilizes the development of national economic of the Baltic States. The author believes that modern infrastructure projects in the Baltic Sea region should be integrated into both western and eastern dimensions.

  13. Increasing seat belt use through state-level demonstration projects : a compendium of initial findings

    Science.gov (United States)

    2008-08-01

    This report summarizes the efforts and results from four of six State-level demonstration projects supported with cooperative agreements from the National Highway Traffic Safety Administration. The projects were intended to increase seat belt use sta...

  14. Learning to make technology work - a study of learning in technology demonstration projects

    DEFF Research Database (Denmark)

    Sutherland Olsen, Dorothy; Andersen, Per Dannemand

    2014-01-01

    Building working demonstrations of new technologies within sustainable energy and transport has become an important activity in the move towards a more energy efficient society. The work involved in building these demonstrations is usually organised in a project with a variety of different partic...

  15. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  16. The optimal project position for demonstrating tricuspid annulus in angiography: an experimental study

    International Nuclear Information System (INIS)

    Bai Yuan; Zong Gongjun; Wang Hongru; Qin Yongwen; Huang Xinmiao; Jiang Haibin

    2009-01-01

    Objective: To explore the optimal project position for demonstrating tricuspid annulus angiographically in experimental goats. Methods: Eight healthy goats underwent right atrial angiography by using 6 F pig tail catheters. Under fluoroscopic monitoring the contrast media (total 110 ml, flow rate 12 ml/ s, pressure 800 psi) was injected continuously while a serious exposures were performed from RAO position to LAO position (totally 180 degree rotation). The maximum diameter of the tricuspid annulus in every picture was measured and the results were compared with that obtained from sonography. Results: The procedure was successful in all 8 experimental goats. The optimal project position to display the tricuspid annulus was at 27 degree ± 3 degree in RAO position. Conclusion: In angiography, the tricuspid annulus can be best demonstrated at the project position of 27 degree ± 3 degree in RAO. (authors)

  17. 78 FR 60887 - Expressions of Interest (EOI) for Chemical Defense Demonstration Projects

    Science.gov (United States)

    2013-10-02

    ... CDP. DATES: Submit the completed and signed DHS Form 10088 (9/12), either electronically or in hard... demonstration project will result in, among other things: (a) A review of current community preparedness...

  18. Inventory of demonstration and trail projects in sustainable energy and transport in Scandinavia

    DEFF Research Database (Denmark)

    Andersen, Per Dannemand; Cramer-Petersen, Claus Lundgaard; Harnes, Kristian N.

    This report documents the work of work package 2 of the InnoDemo research project funded by the Research Council of Norway. Partners in the project are The Nordic Institute for Studies in Innovation, Research and Education (NIFU) (project leader), DTU Management Engineering at Technical University...... of Denmark, and CIRCLE at Lund’s University. From a state-of-the-art study in the project’s work package 1, a set of characteristics have been specified to be collected in an inventory of demonstration projects and funding programmes. This data was collected in parallel in Denmark, Norway and Sweden...

  19. Ultra-clean Fischer-Tropsch (F-T) Fuels Production and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Stephen P. Bergin

    2006-06-30

    The objective of the DOE-NETL Fischer-Tropsch (F-T) Production and Demonstration Program was to produce and evaluate F-T fuel derived from domestic natural gas. The project had two primary phases: (1) fuel production of ultra-clean diesel transportation fuels from domestic fossil resources; and (2) demonstration and performance testing of these fuels in engines. The project also included a well-to-wheels economic analysis and a feasibility study of small-footprint F-T plants (SFPs) for remote locations such as rural Alaska. During the fuel production phase, ICRC partnered and cost-shared with Syntroleum Corporation to complete the mechanical design, construction, and operation of a modular SFP that converts natural gas, via F-T and hydro-processing reactions, into hydrogensaturated diesel fuel. Construction of the Tulsa, Oklahoma plant started in August 2002 and culminated in the production of over 100,000 gallons of F-T diesel fuel (S-2) through 2004, specifically for this project. That fuel formed the basis of extensive demonstrations and evaluations that followed. The ultra-clean F-T fuels produced had virtually no sulfur (less than 1 ppm) and were of the highest quality in terms of ignition quality, saturation content, backend volatility, etc. Lubricity concerns were investigated to verify that commercially available lubricity additive treatment would be adequate to protect fuel injection system components. In the fuel demonstration and testing phase, two separate bus fleets were utilized. The Washington DC Metropolitan Area Transit Authority (WMATA) and Denali National Park bus fleets were used because they represented nearly opposite ends of several spectra, including: climate, topography, engine load factor, mean distance between stops, and composition of normally used conventional diesel fuel. Fuel evaluations in addition to bus fleet demonstrations included: bus fleet emission measurements; F-T fuel cold weather performance; controlled engine dynamometer

  20. Strengthening global health security capacity--Vietnam demonstration project, 2013.

    Science.gov (United States)

    Tran, Phu Dac; Vu, Long Ngoc; Nguyen, Hien Tran; Phan, Lan Trong; Lowe, Wayne; McConnell, Michelle S; Iademarco, Michael F; Partridge, Jeffrey M; Kile, James C; Do, Trang; Nadol, Patrick J; Bui, Hien; Vu, Diep; Bond, Kyle; Nelson, David B; Anderson, Lauren; Hunt, Kenneth V; Smith, Nicole; Giannone, Paul; Klena, John; Beauvais, Denise; Becknell, Kristi; Tappero, Jordan W; Dowell, Scott F; Rzeszotarski, Peter; Chu, May; Kinkade, Carl

    2014-01-31

    Over the past decade, Vietnam has successfully responded to global health security (GHS) challenges, including domestic elimination of severe acute respiratory syndrome (SARS) and rapid public health responses to human infections with influenza A(H5N1) virus. However, new threats such as Middle East respiratory syndrome coronavirus (MERS-CoV) and influenza A(H7N9) present continued challenges, reinforcing the need to improve the global capacity to prevent, detect, and respond to public health threats. In June 2012, Vietnam, along with many other nations, obtained a 2-year extension for meeting core surveillance and response requirements of the 2005 International Health Regulations (IHR). During March-September 2013, CDC and the Vietnamese Ministry of Health (MoH) collaborated on a GHS demonstration project to improve public health emergency detection and response capacity. The project aimed to demonstrate, in a short period, that enhancements to Vietnam's health system in surveillance and early detection of and response to diseases and outbreaks could contribute to meeting the IHR core capacities, consistent with the Asia Pacific Strategy for Emerging Diseases. Work focused on enhancements to three interrelated priority areas and included achievements in 1) establishing an emergency operations center (EOC) at the General Department of Preventive Medicine with training of personnel for public health emergency management; 2) improving the nationwide laboratory system, including enhanced testing capability for several priority pathogens (i.e., those in Vietnam most likely to contribute to public health emergencies of international concern); and 3) creating an emergency response information systems platform, including a demonstration of real-time reporting capability. Lessons learned included awareness that integrated functions within the health system for GHS require careful planning, stakeholder buy-in, and intradepartmental and interdepartmental coordination and

  1. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  2. K25/K27 Characterization for Demonstrating Criticality Incredibility K-25 / K-27 D and D Project

    International Nuclear Information System (INIS)

    Haghighi, Mahmoud H.; Howe, Kathleen E.; Chandler, John R.

    2008-01-01

    The K-25 and K-27 Buildings are currently undergoing decontamination and decommissioning (D and D) as part of a non-time critical removal action. When the enrichment process was shut-down, the process gas equipment and piping was purged to remove UF 6 , but the process gas system was not generally chemically treated to remove solid holdup. Generally, chemical treatment was completed it was not very effective in removing the larger deposits. Because of this, uranium deposits continue to reside throughout the process gas system. There is the potential for unreacted UF 6 to be present, as well. A key part of this project is to locate the remaining significant uranium deposits and manage them appropriately. Since some process gas components in the K-25 and K-27 Buildings contain enriched uranium holdup, it is important to ensure nuclear criticality safety during demolition or subsequent loading and transport of waste. Therefore, a major task in preparation for demolition is to demonstrate that 'criticality is incredible (CI)' in each building area. The U.S. Department of Energy (DOE) and Bechtel Jacobs Company LLC (BJC) are in agreement that proper and thorough characterization of fissile holdup material in the K-25 and K-27 process gas components is a key element in achieving and demonstrating that criticality is incredible, as well as in management of demolition wastes and collection of holdup material. While the classic project scheduling wisdom may indicate that performing all of the data quality objectives (DQO) and planning before the field work starts, the size of the K-25 / K-27 D and D Project combined with the evolving decommissioning plans and re-plans have indicated that a fresh look at what further characterization data are needed to meet the current project requirements. Performing a DQO in the middle of the project allowed a much greater degree of accuracy of the real project data needs than was possible even 22 months ago. The outcome of the DQO work

  3. A Day in the Life of the Laser Communications Relay Demonstration (LCRD) Project.

    Science.gov (United States)

    Israel, David; Caroglanian, Armen; Edwards, Bernard; Spero, James; Roberts, Tom; Moores, John

    2016-01-01

    This presentation provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MITLL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the ground work for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications potential to meet NASAs growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  5. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  6. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. Major Events Coordinated Security Solutions: The Application of the Project Management Body of Knowledge for Managing a Science and Technology Project

    Science.gov (United States)

    2011-02-01

    represents the sum of knowledge related to project management and includes best practises and techniques generally accepted by the project...project has demonstrated that the principles of project management can be applied even to those activities that naturally resist the structure and...team and to engender trust in the output. DRDC believes strongly in the application of sound project management principles and uses an abbreviated

  10. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  11. Application of the ALARP principle to a major refurbishment project at Sellafield

    International Nuclear Information System (INIS)

    Hendrickson, W.R.; Coates, R.

    1989-01-01

    A formalised structured approach to the ALARP principle has been developed and is being applied to occupational radiation exposure on a major refurbishment project at Sellafield. The processes consider the conceptual and subsequent detailed design stages, planning and operational control and incorporates a dose feedback and review system. The approach has led to significant dose savings so far on the project, with recorded doses being significantly less than the doses estimated at the preliminary assessment stage. (author)

  12. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  13. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sheppy, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Metzger, I. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cutler, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Holland, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hanada, A. [Naval Facilities Engineering Command, Washington, DC (United States)

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  14. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    Science.gov (United States)

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  17. Public relations work for major railway projects; Oeffentlichkeitsarbeit fuer grosse Bahnprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Guertner, R. [Tram Zuerich West, Verkehrsbetriebe Zuerich (Switzerland); Braun, D.; Steiner, R. [Basler und Hofmann Ingenieure und Planer AG, Zuerich (Switzerland)

    2005-07-01

    Major railway construction projects attract a lot of public attention. They involve heavy investment, and cause local residents a good deal of inconvenience. This tends to obscure the fact that new railway lines and new railway tunnels bring significant improvements for the majority of citizens: better connections, more comfortable travel and frequently also less local noise. Furthermore, only a few people in the know are aware of how much technical and human effort lies behind the new structures. All the more reason therefore to make a serious public relations effort - on the part of the clients as well as the contractors involved. (orig.)

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  20. Bavarian liquid hydrogen bus demonstration project - safety, licensing and acceptability aspects

    Energy Technology Data Exchange (ETDEWEB)

    Wurster, R.; Knorr, H.; Pruemm, W.

    1999-07-01

    A regular 12 m city bus of the MAN SL 202 type with an internal combustion engine adapted to hydrogen operation and auxiliary gasoline operation was demonstrated in the Bavarian cities of Erlangen and Munich between April 1996 and August 1998. Three bus operators, Erlanger Stadtwerke, Stadtwerke Muenchen and Autobus Oberbayern were testing the bus in three different operating schemes. In order to be able to perform this worldwide first public demonstration of a liquid hydrogen (LH{sub 2}) city bus in regular service, several requirements with respect to safety, licensing, training and acceptability had to be fulfilled. These activities were focusing mainly on the hydrogen specific issues such as (a) integration of onboard LH{sub 2} storage vessels, piping and instrumentation, (b) implementation of storage and refueling infrastructure in the operators' yards, (c) adaptation of the maintenance garages, (d) training of operating and maintenance personnel. During phase II of the demonstration activity a poll was performed on passengers traveling onboard the hydrogen-powered city bus in order to determined the level of acceptance among the users of the bus. The bus was designed and manufactured by MAN Nutzfahrzeuge Aktiengesellschaft. The cryogenic fuel storage and the refueling equipment were designed and manufactured by Linde AG. The realization of the hardware was financially supported by the European Commission (EC) within the Euro-Quebec Hydro-Hydrogen Pilot Project. The demonstration phase was financially supported by EC and the Bavarian State Government. Ludwig-Boelkow-Systemtechnik performed project monitoring for both funding organizations. The presentation will summarize the most important results of this demonstration phase and will address the measures undertaken in order to get the bus, the refueling infrastructure and the maintenance and operating procedures approved by the relevant authorities.

  1. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  2. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-09-09

    .... Satisfaction of customers; and 7. Workforce satisfaction with the personnel management system. An evaluation... personnel system under an appropriate demonstration project as defined in section 342(b) of Public Law 103... for the TARDEC mission, adjust the workforce for change, and improve workforce satisfaction. The...

  3. 78 FR 34655 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-06-10

    ... CONTACT: Office of Naval Research: Ms. Margaret J. Mitchell, Director, Human Resources Office, Office of... established position management criteria, and (2) Pay Band V of the S&E Professional Career Track require... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research (ONR); Proposed...

  4. Summary report on the Y-12 Sludge Detoxification Demonstration project

    International Nuclear Information System (INIS)

    Jolley, R.L.; Hollenbeck, P.E.; Kennerly, J.M.; Singh, S.P.N.

    1994-07-01

    The Y-12 Sludge Detoxification Demonstration was conducted in late 1988 at the Oak Ridge Gaseous Diffusion Plant (subsequently renamed the K-25 Site). The erstwhile Waste Management Technology Center (WMTC) managed the conduct of this waste treatment technology to assist the US Department of Energy/Oak Ridge Operations (DOE/ORO) in implementing the DOE Model. This demonstration was the first project selected by the Hazardous Waste Remedial Actions Program (HAZWRAP)(and funded by DOE) in which a private-sector vendor was contracted to demonstrate an innovative treatment process for treating some of the Oak Ridge Site's radioactive mixed wastes to enable their environmentally compliant disposal. Chem-Nuclear Systems, Inc. (CNSI) was the private-sector vendor selected to demonstrate its X*TRAX trademark process. Briefly, the X*TRAX trademark process consisted of thermally treating the sludge in an inert atmosphere (to remove the volatile components) to yield a dry residue (containing the nonvolatilized sludge components) and condensed liquids. The dry residue can then be immobilized in cementitious matrix for delisting and disposal in an industrial landfill; the condensed liquids can be disposed in, for example, an incinerator

  5. IEA low NOx combustion project Stage III. Low NOx combustion and sorbent injection demonstration projects. V.2

    International Nuclear Information System (INIS)

    Payne, R.

    1991-03-01

    This report summarizes the main results from an IES project concerning the demonstration of low-NO x combustion and sorbent injection as techniques for the control of NO x and SO x emissions from pulverized coal fired utility boilers. The project has built upon information generated in two previous stages of activity, where NO x and SO x control processes were evaluated at both fundamental and pilot-scales. The concept for this stage of the project was for a unique collaboration, where the participating countries (Canada, Denmark and Sweden, together with the United States) have pooled information from full scale boiler demonstrations of low-NO x burner and sorbent injection technologies, and have jointly contributed to establishing a common basis for data evaluation. Demonstration testing was successfully carried out on five wall-fired commercial boiler systems which ranged in size from a 20 MW thermal input boiler used for district heating, up to a 300 MW electric utility boiler. All of these units were fired on high-volatile bituminous coals with sulfur contents ranging from 0.6-3.2 percent. At each site the existing burners were either modified or replaced to provide for low-NO x combustion, and provisions were made to inject calcium based sorbent materials into the furnace space for SO 2 emission control. The results of sorbent injection testing showed moderate levels of SO 2 removal which ranged from approximately 15 to 55 percent at an injected calcium to sulfur molar ratio to 2.0 and with boiler operation at nominal full load. Sulfur capture was found to depend upon the combined effects of parameters such as: sorbent type and reactivity; peak sorbent temperature; coal sulfur content; and the thermal characteristics of the boilers. (8 refs., 58 figs., 6 tabs.)

  6. Vehicle to Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  7. Uranium soils integrated demonstration: Soil characterization project report

    International Nuclear Information System (INIS)

    Cunnane, J.C.; Gill, V.R.; Lee, S.Y.; Morris, D.E.; Nickelson, M.D.; Perry, D.L.; Tidwell, V.C.

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP

  8. Uranium soils integrated demonstration: Soil characterization project report

    Energy Technology Data Exchange (ETDEWEB)

    Cunnane, J.C. [Argonne National Lab., IL (United States); Gill, V.R. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Lee, S.Y. [Oak Ridge National Lab., TN (United States); Morris, D.E. [Los Alamos National Lab., NM (United States); Nickelson, M.D. [HAZWRAP, Oak Ridge, TN (United States); Perry, D.L. [Lawrence Berkeley Lab., CA (United States); Tidwell, V.C. [Sandia National Labs., Albuquerque, NM (United States)

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

  9. Isolated elders demonstration project : closer to home - a descriptive evaluation

    OpenAIRE

    Cusack, Sandra A.

    1996-01-01

    The purpose of this demonstration project is to support isolated elders through outreach. The goal is to get seniors "out of their homes" and back into the community, assisting them to make decisions and take action on their own behalf. The process involved training a group of volunteers to interview elders, using a mini-life review technique to encourage reminiscence. In listening to their stories, the volunteer's task was to discover the elder's needs and barriers to socialization, and to l...

  10. A summary of the environmental restoration program retrieval demonstration project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    McQuary, J.

    1991-02-01

    This report provides a summary of the Environmental Restoration Program's Retrieval Demonstration Project at the Idaho National Engineering Laboratory. This project developed concepts for demonstrating facilities and equipment for the retrieval of buried transuranic mixed waste at the INEL. Included is a brief assessment of the viability, cost effectiveness, and safety of retrieval based on the developed concept. Changes made in Revision 1 reflect editorial changes only. 31 refs., 1 fig

  11. Subsurface barrier demonstration test strategy and performance specification

    International Nuclear Information System (INIS)

    Treat, R.L.; Cruse, J.M.

    1994-05-01

    This document was developed to help specify a major demonstration test project of subsurface barrier systems supporting the Tank Waste Remediation System (TWRS) Program. The document focuses discussion on requirements applicable to demonstration of three subsurface barrier concepts: (1) Injected Material, (2) Cryogenic, and (3) Desiccant. Detailed requirements are provided for initial qualification of a technology proposal followed by the pre-demonstration and demonstration test requirements and specifications. Each requirement and specification is accompanied by a discussion of the rationale for it. The document also includes information on the Hanford Site tank farms and related data; the related and currently active technology development projects within the DOE's EM-50 Program; and the overall demonstration test strategy. Procurement activities and other preparations for actual demonstration testing are on hold until a decision is made regarding further development of subsurface barriers. Accordingly, this document is being issued for information only

  12. Ornamental Marine Species Culture in the Coral Triangle: Seahorse Demonstration Project in the Spermonde Islands, Sulawesi, Indonesia

    Science.gov (United States)

    Williams, Susan L.; Janetski, Noel; Abbott, Jessica; Blankenhorn, Sven; Cheng, Brian; Crafton, R. Eliot; Hameed, Sarah O.; Rapi, Saipul; Trockel, Dale

    2014-12-01

    Ornamental marine species (`OMS') provide valuable income for developing nations in the Indo-Pacific Coral Triangle, from which most of the specimens are exported. OMS culture can help diversify livelihoods in the region, in support of management and conservation efforts to reduce destructive fishing and collection practices that threaten coral reef and seagrass ecosystems. Adoption of OMS culture depends on demonstrating its success as a livelihood, yet few studies of OMS culture exist in the region. We present a case study of a land-based culture project for an endangered seahorse ( Hippocampus barbouri) in the Spermonde Islands, Sulawesi, Indonesia. The business model demonstrated that culturing can increase family income by seven times. A Strengths Weaknesses Opportunities Threats (SWOT) analysis indicated good collaboration among diverse stakeholders and opportunities for culturing non-endangered species and for offshoot projects, but complicated permitting was an issue as were threats of market flooding and production declines. The OMS international market is strong, Indonesian exporters expressed great interest in cultured product, and Indonesia is the largest exporting country for H. barbouri. Yet, a comparison of Indonesia ornamental marine fish exports to fish abundance in a single local market indicated that OMS culture cannot replace fishing livelihoods. Nevertheless, seahorse and other OMS culture can play a role in management and conservation by supplementing and diversifying the fishing and collecting livelihoods in the developing nations that provide the majority of the global OMS.

  13. Recent progress of the waste processing and disposal projects within the Underground Storage Tank-Integrated Demonstration

    International Nuclear Information System (INIS)

    Hunt, R.D.; McGinnis, C.P.; Cruse, J.M.

    1994-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration and Waste Remediation has created the Office of Technology Development (OTD) to provide new and improved remediation technologies for the 1 x 10 8 gal of radioactive waste in the underground storage tanks (USTs) at five DOE sites. The OTD established and the Underground Storage Tank-Integrated Demonstration (UST-ID) to perform demonstrations, tests, and evaluations on these new technologies before these processes are transferred to the tank sites for use in full-scale remediation of the USTs. The UST-ID projects are performed by the Characterization and Waste Retrieval Program or the Waste Processing and Disposal Program (WPDP). During FY 1994, the WPDP is funding 12 projects in the areas of supernate processing, sludge processing, nitrate destruction, and final waste forms. The supernate projects are primarily concerned with cesium removal. A mobile evaporator and concentrator for cesium-free supernate is also being demonstrated. The sludge projects are emphasizing sludge dissolution and the evaluation of the TRUEX and diamide solvent extraction processes for transuranic waste streams. One WPDP project is examining both supernate and sludge processes in an effort to develop a system-level plan for handling all UST waste. The other WPDP studies are concerned with nitrate and organic destruction as well as subsequent waste forms. The current status of these WPDP projects is presented

  14. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  15. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  16. The HAW-project: Demonstration facility for the disposal of high-level waste in salt

    International Nuclear Information System (INIS)

    Rothfuchs, T.; Duijves, K.A.

    1990-04-01

    The HAW-project plants the testwise emplacement of 30 vitrified highly radioactive canisters containing Cs-137 and Sr-90 at the 800 m level of the Asse salt mine for a testing period of approximately five years. The major objective of this project is the pilot testing and demonstration of safe methods for the final disposal of high-level radioactive waste (HAW) in geological salt formations. During the years 1985 to 1989 the underground test field was excavated, the measuring equipment installed, and two preceedings inactive electrical tests taken into operation. Furthermore, the components of a system for transportation and emplacement of highly radioactive canisters was fabricated, installed, and preliminarily tested. After some delays in the licensing procedure the emplacement of the 30 radioactive canisters is now envisaged for early 1991. For handling of the radioactive canisters and their emplacement into the boreholes a system consisting of a transport cask, a transport vehicle, a disposal machine, and of a borehole slider has been developed and will be tested. The actual scientific investigation programme is based on the estimation and observation of the interaction between the radioactive canisters and the rock salt. This programme includes measurement of thermally and radiolytically induced water and gas release from the rock salt and the radiolytical decomposition of salt minerals. Also the thermally induced stress and deformation fields in the surrounding rock mass will be investigated carefully. (orig./HP)

  17. A Classroom Demonstration of Potential Biases in the Subjective Interpretation of Projective Tests.

    Science.gov (United States)

    Wiederman, Michael W.

    1999-01-01

    Suggests that instructors teaching psychological assessment can use a demonstration to illustrate potential biases when subjectively interpreting response to projective stimuli. Outlines the classroom procedure, notes styles of learning involved, and presents a summary of student evaluations. (DSK)

  18. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Information Collection: DS-4048, Projected Sales of Major Weapons in Support of Section 25(a)(1) of the Arms... Reduction Act of 1995. Title of Information Collection: Projected Sales of Major Weapons in Support of... automated collection techniques or other forms of technology. Abstract of proposed collection: Section 25(a...

  19. Electric G-Van demonstration and commercial assessment project

    Energy Technology Data Exchange (ETDEWEB)

    Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  20. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  1. From demonstration projects to volume market : Market development for advanced housing renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Prendergast, E.; Rodsjo, A.; Haavik, T.; Parker, P.

    2010-01-01

    How do we get from demonstration projects to a volume market for very low energy demand in advanced housing renovation? The contributors to this report have been working with this issue for many years. Some worked in both IEA SHC Task 28 Sustainable Housing (2000-2005) and in SHC Task 37 Advanced

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. Large-scale demonstration and deployment project at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Brown, S.; McFee, J.; Broom, C.; Dugger, H.; Stallings, E.

    1999-01-01

    Established by the US Department of Energy (DOE) Environmental Management program through its Office of Science and Technology, the Deactivation and Decommissioning Focus Area is developing answers to the technological problems that hinder Environmental Management's extensive cleanup efforts. The optimized application of technologies to ongoing nuclear facility decontamination and dismantlement is critical in meeting the challenge of decommissioning approximately 9,000 buildings and structures within the DOE complex. The significant technical and economic concerns in this area underscore a national imperative for the qualification and timely delivery of cost-reduction technologies and management approaches to meet federal and private needs. At Los Alamos National Laboratory (LANL), a Large-Scale Demonstration and Deployment Project (LSDDP) has been established to facilitate demonstration and deployment of technologies for the characterization, decontamination, and volume reduction of oversized metallic waste, mostly in the form of gloveboxes contaminated with transuranic radionuclides. The LANL LSDDP is being managed by an integrated contractor team (ICT) consisting of IT Corporation, ICF Incorporated, and Florida International University and includes representation from LANL's Environmental Management Program Office. The ICT published in the Commerce Business Daily a solicitation for interest for innovative technologies capable of improving cost and performance of the baseline process. Each expression of interest response was evaluated and demonstration contract negotiations are under way for those technologies expected to be capable of meeting the project objectives. This paper discusses management organization and approach, the results of the technology search, the technology selection methodology, the results of the selection process, and future plans for the program

  5. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program? 425.1 Section 425.1 Education Regulations of the Offices... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General...

  6. 75 FR 27808 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Science.gov (United States)

    2010-05-18

    ... Voucher Program--Demonstration Project of Small Area Fair Market Rents in Certain Metropolitan Areas for.... ACTION: Notice of Demonstration Project of Small Area Fair Market Rents (FMRs) in Selected Metropolitan... topics related to small area FMRs, including how these small areas should be defined. Small area FMRs...

  7. Characteristics of Young Children Exposed to Violence: The Safe Start Demonstration Project

    Science.gov (United States)

    Kaufman, Joy S.; Ortega, Sandra; Schewe, Paul A.; Kracke, Kristen

    2011-01-01

    The Safe Start demonstration projects, funded by the Office of Juvenile Justice and Delinquency Prevention (OJJDP) under the first phase of the Safe Start initiative, are primarily designed to influence change at the systems or macrolevels to reduce the incidence of and impact of exposure to violence for children aged birth to 6 years; direct…

  8. Demonstration of micro-projection enabled short-range communication system for 5G.

    Science.gov (United States)

    Chou, Hsi-Hsir; Tsai, Cheng-Yu

    2016-06-13

    A liquid crystal on silicon (LCoS) based polarization modulated image (PMI) system architecture using red-, green- and blue-based light-emitting diodes (LEDs), which offers simultaneous micro-projection and high-speed data transmission at nearly a gigabit, serving as an alternative short-range communication (SRC) approach for personal communication device (PCD) application in 5G, is proposed and experimentally demonstrated. In order to make the proposed system architecture transparent to the future possible wireless data modulation format, baseband modulation schemes such as multilevel pulse amplitude modulation (M-PAM), M-ary phase shift keying modulation (M-PSK) and M-ary quadrature amplitude modulation (M-QAM) which can be further employed by more advanced multicarrier modulation schemes (such as DMT, OFDM and CAP) were used to investigate the highest possible data transmission rate of the proposed system architecture. The results demonstrated that an aggregative data transmission rate of 892 Mb/s and 900 Mb/s at a BER of 10^(-3) can be achieved by using 16-QAM baseband modulation scheme when data transmission were performed with and without micro-projection simultaneously.

  9. 76 FR 50813 - Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures

    Science.gov (United States)

    2011-08-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures AGENCY: Federal Transit Administration (FTA... Administration (FTA) to publish policy guidance on the New and Small Starts capital project review and evaluation...

  10. West Valley Demonstration Project community relations plan FY 1990/91

    International Nuclear Information System (INIS)

    Damerow, M.W.

    1989-09-01

    The purpose of the Community Relations Plan is to fully inform the community about the West Valley Demonstration Project (WVDP) and provide opportunities for public input. A sound approach to community relations is essential to the creation and maintenance of public awareness and community support. The WVDP is a matter of considerable public interest because it deals with nuclear waste. The mission of the WVDP is to solve an existing environmental concern by solidifying high-level radioactive waste and transporting the solidified waste to a federal repository for permanent disposal. The public requires evidence of the continued commitment and demonstrated progress of the industry and government in carrying out the mission in order to sustain confidence that the WVDP is being managed well and will be discussed successfully completed. For this reason, a comprehensive communication plan is essential for the successful completion of the WVDP

  11. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    Science.gov (United States)

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  12. Rubbertown Next Generation Emission Measurement Demonstration Project Provides Innovative Approaches to Protecting Air Quality

    Science.gov (United States)

    EPA and the Louisville Metro Air Pollution Control District (LMAPCD) are working together on a research project to demonstrate NGEM approaches near facilities in the Rubbertown industrial area of Louisville, KY.

  13. Advanced fuel gas desulfurization (AFGD) demonstration project. Technical progress report No. 19, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The {open_quotes}Advanced Flue Gas Desulfurization (AFGD) Demonstration Project{close_quotes} is a $150.5 million cooperative effort between the U.S. Department of Energy and Pure Air, a general partnership of Air Products and Chemicals, Inc. and Mitsubishi Heavy Industries America, Inc. The AFGD process is one of several alternatives to conventional flue gas desulfurization (FGD) being demonstrated under the Department of Energy`s Clean Coal Technology Demonstration Program. The AFGD demonstration project is located at the Northern Indiana Public Service Company`s Bailly Generating Station, about 12 miles northeast of Gary, Indiana.

  14. Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers

    Science.gov (United States)

    Bachman, Jane T.; Kota, Dena H.; Kota, Aaron J.

    2011-01-01

    Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned

  15. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  16. Developing a research and practice tool to measure walkability: a demonstration project.

    Science.gov (United States)

    Giles-Corti, Billie; Macaulay, Gus; Middleton, Nick; Boruff, Bryan; Bull, Fiona; Butterworth, Iain; Badland, Hannah; Mavoa, Suzanne; Roberts, Rebecca; Christian, Hayley

    2014-12-01

    Growing evidence shows that higher-density, mixed-use, pedestrian-friendly neighbourhoods encourage active transport, including transport-related walking. Despite widespread recognition of the benefits of creating more walkable neighbourhoods, there remains a gap between the rhetoric of the need for walkability and the creation of walkable neighbourhoods. Moreover, there is little objective data to benchmark the walkability of neighbourhoods within and between Australian cities in order to monitor planning and design intervention progress and to assess built environment and urban policy interventions required to achieve increased walkability. This paper describes a demonstration project that aimed to develop, trial and validate a 'Walkability Index Tool' that could be used by policy makers and practitioners to assess the walkability of local areas; or by researchers to access geospatial data assessing walkability. The overall aim of the project was to develop an automated geospatial tool capable of creating walkability indices for neighbourhoods at user-specified scales. The tool is based on open-source software architecture, within the Australian Urban Research Infrastructure Network (AURIN) framework, and incorporates key sub-component spatial measures of walkability (street connectivity, density and land use mix). Using state-based data, we demonstrated it was possible to create an automated walkability index. However, due to the lack of availability of consistent of national data measuring land use mix, at this stage it has not been possible to create a national walkability measure. The next stage of the project is to increase useability of the tool within the AURIN portal and to explore options for alternative spatial data sources that will enable the development of a valid national walkability index. AURIN's open-source Walkability Index Tool is a first step in demonstrating the potential benefit of a tool that could measure walkability across Australia. It

  17. Explosives disposal demonstration projects. Progress report, April 12, 1995--June 30, 1995

    International Nuclear Information System (INIS)

    Charbeneau, R.

    1995-01-01

    This report contains quarterly reports on two projects. The first is undertaking the environmental restoration at the Pantex Plant. Research objectives are organized under four general tasks: field testing and produced water treatment, bioremediation of contaminated groundwater and soils, vadose zone remediation, and chromium remediation. The other project goal is to demonstrate generation of diamond by explosive compression of Carbon 60 and Carbon 70 and mixtures of these fullerenes. The intent is to exploit expertise developed by Pantex and other DOE Laboratories in the area of understanding and modeling of explosive compression for initiation of nuclear fission reactions to explosively compress carbon in the form of fullerenes with the goal of transforming the material into the diamond phase

  18. ACSEPT a European project for a new step in the future demonstration of advanced fuel processing

    International Nuclear Information System (INIS)

    Bourg, S.; Hill, C.; Caravaca, C.; Espartero, A.; Rhodes, C.; Taylor, R.; Harrison, M.; EKBERG, C.; GEIST, A.; Modolo, G.; Cassayre, L.; Malmbeck, R.; De Angelis, G.; Bouvet, S.; Klaassen, F.

    2010-01-01

    For more than fifteen years, a European scientific community has joined its effort to develop and optimise processes for the partitioning of actinides from fission products. In an international context of 'nuclear renaissance', the upcoming of a new generation of nuclear reactor (Gen IV) will require the development of associated advanced closed fuel cycles which answer the needs of a sustainable nuclear energy: the minimization of the production of long lived radioactive waste but also the optimization of the use of natural resources with an increased resistance to proliferation. Actually, Partitioning and Transmutation (P and T), associated to a multi-recycling of all transuranics (TRUs), should play a key role in the development of this sustainable nuclear energy. By joining together 34 Partners coming from European universities, nuclear research bodies and major industrial players in a multidisciplinary consortium, the FP7 EURATOM-Fission Collaborative Project ACSEPT (Actinide recycling by Separation and Transmutation), started in 2008 for four year duration, provides the sound basis and fundamental improvements for future demonstrations of fuel treatment in strong connection with fuel fabrication techniques. Consistently with potentially viable recycling strategies, ACSEPT therefore provides a structured R and D framework to develop chemical separation processes compatible with fuel fabrication techniques, with a view to their future demonstration at the pilot level. ACSEPT is organized into three technical domains: (i) Considering technically mature aqueous separation processes, ACSEPT works to optimize and select the most promising ones dedicated either to actinide partitioning or to group actinide separation. (ii) Concerning high temperature pyrochemical separation processes, ACSEPT focuses on the enhancement of the two reference cores of process selected within previous projects. R and D efforts are now devoted to key scientific and technical points

  19. Observations of coastal sediment dynamics of the Tijuana Estuary Fine Sediment Fate and Transport Demonstration Project, Imperial Beach, California

    Science.gov (United States)

    Warrick, Jonathan A.; Rosenberger, Kurt J.; Lam, Angela; Ferreiera, Joanne; Miller, Ian M.; Rippy, Meg; Svejkovsky, Jan; Mustain, Neomi

    2012-01-01

    Coastal restoration and management must address the presence, use, and transportation of fine sediment, yet little information exists on the patterns and/or processes of fine-sediment transport and deposition for these systems. To fill this information gap, a number of State of California, Federal, and private industry partners developed the Tijuana Estuary Fine Sediment Fate and Transport Demonstration Project ("Demonstration Project") with the purpose of monitoring the transport, fate, and impacts of fine sediment from beach-sediment nourishments in 2008 and 2009 near the Tijuana River estuary, Imperial Beach, California. The primary purpose of the Demonstration Project was to collect and provide information about the directions, rates, and processes of fine-sediment transport along and across a California beach and nearshore setting. To achieve these goals, the U.S. Geological Survey monitored water, beach, and seafloor properties during the 2008–2009 Demonstration Project. The project utilized sediment with ~40 percent fine sediment by mass so that the dispersal and transport of fine sediment would be easily recognizable. The purpose of this report is to present and disseminate the data collected during the physical monitoring of the Demonstration Project. These data are available online at the links noted in the "Additional Digital Information" section. Synthesis of these data and results will be provided in subsequent publications.

  20. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  1. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  2. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  3. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  4. U1/U2 crib groundwater biological treatment demonstration project

    International Nuclear Information System (INIS)

    Koegler, S.S.; Brouns, T.M.; Heath, W.O.

    1989-11-01

    The primary objective of the biological treatment project is to develop and demonstrate a process for Hanford groundwater remediation. Biodenitrification using facultative anaerobic microorganisms is a promising technology for the simultaneous removal of nitrates and organics from contaminated aqueous streams. During FY 1988, a consortium of Hanford groundwater microorganisms was shown to degrade both nitrates and carbon tetrachloride (CC1 4 ). A pilot-scale treatment system was designed and constructed based on the results of laboratory-and-bench-scale testing. This report summarizes the results of biological groundwater treatment studies performed during FY 1989 at the pilot-scale. These tests were conducted using a simulated Hanford groundwater with a continuous stirred-tank bioreactor, and a fluidized-bed bioreactor that was added to the pilot-scale treatment system in FY 1989. The pilot-scale system demonstrated continuous degradation of nitrates and CC1 4 in a simulated groundwater. 4 refs., 7 figs., 1 tab

  5. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  6. Texas Telecommunication Satellite Demonstration Project. Planning Effort for Application of Communication Satellites in Education.

    Science.gov (United States)

    Education Service Center Region 4, Houston, TX.

    The primary goal of the Texas Telecommunication Satellite Demonstration consortium is to install, operate, and evaluate a comprehensive communication service delivery system which would provide the citizens of Texas with greater opportunity for equal access to education and information. The four major objectives of the demonstration are (1) to…

  7. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  8. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  9. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  10. Validation of Solar Sail Simulations for the NASA Solar Sail Demonstration Project

    Science.gov (United States)

    Braafladt, Alexander C.; Artusio-Glimpse, Alexandra B.; Heaton, Andrew F.

    2014-01-01

    NASA's Solar Sail Demonstration project partner L'Garde is currently assembling a flight-like sail assembly for a series of ground demonstration tests beginning in 2015. For future missions of this sail that might validate solar sail technology, it is necessary to have an accurate sail thrust model. One of the primary requirements of a proposed potential technology validation mission will be to demonstrate solar sail thrust over a set time period, which for this project is nominally 30 days. This requirement would be met by comparing a L'Garde-developed trajectory simulation to the as-flown trajectory. The current sail simulation baseline for L'Garde is a Systems Tool Kit (STK) plug-in that includes a custom-designed model of the L'Garde sail. The STK simulation has been verified for a flat plate model by comparing it to the NASA-developed Solar Sail Spaceflight Simulation Software (S5). S5 matched STK with a high degree of accuracy and the results of the validation indicate that the L'Garde STK model is accurate enough to meet the potential future mission requirements. Additionally, since the L'Garde sail deviates considerably from a flat plate, a force model for a non-flat sail provided by L'Garde sail was also tested and compared to a flat plate model in S5. This result will be used in the future as a basis of comparison to the non-flat sail model being developed for STK.

  11. DOD Residential Proton Exchange Membrane (PEM) Fuel Cell Demonstration Program. Volume 2. Summary of Fiscal Year 2001-2003 Projects

    Science.gov (United States)

    2005-09-01

    produced many of the Beatles 1970s recordings. This facility was selected to host the UK PEM demonstration project from a selection of four potential sites...funded the Department of Defense (DOD) Residential PEM Demonstration Project to demonstrate domestically-produced, residential Proton Exchange Membrane...PEM) fuel cells at DOD Facilities. The objectives were to: (1) assess PEM fuel cells’ role in supporting sustainability at military installations

  12. NNC - managing major projects and the lessons learned

    International Nuclear Information System (INIS)

    Clements, J.M.

    1989-01-01

    The formation and development of NNC Ltd (formerly National Nuclear Corporation Ltd) is explained. Its role in the building of 16 nuclear power stations in the UK is outlined. For the last two of these, Heysham-B and Torness, NNC's role as station designer and manager of the nuclear island construction and at Torness as whole site overseers is described. The NNC negotiated and placed all the major contracts for the two stations and developed a budgetary control program through which the Central and South of Scotland Electricity Generating Boards were able to participate in the allotment of budget cover for each contract and for any anticipated variations and claims. Each project had a manager and about 20 responsible engineers plus contract engineers. The government decisions to change to PWR type reactors and to privatise the electricity industry have resulted in changes and structural management in NNC Ltd. (UK)

  13. Tumulus Disposal Demonstration Project assessment plan for potential worker exposure: Revision 1

    International Nuclear Information System (INIS)

    Styers, D.R.

    1989-03-01

    The purpose of the ''Assessment Plan for Potential Worker Exposure'' is to determine the potential radiological exposures to the workers as they dispose of low-level radioactive wastes (LLW) on the Tumulus Disposal Demonstration Project (TDDP). An evaluation of the work procedures and precautions will be made so as to maintain the exposure levels As Low As Reasonably Achievable (ALARA). 10 refs., 10 figs

  14. Environmental assessment for the Waste Water Treatment Facility at the West Valley Demonstration Project and finding of no significant impact

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    The possible environmental impacts from the construction and operation of a waste water treatment facility for the West Valley Demonstration Project are presented. The West Valley Project is a demonstration project on the solidification of high-level radioactive wastes. The need for the facility is the result of a rise in the work force needed for the project which rendered the existing sewage treatment plant incapable of meeting the nonradioactive waste water treatment needs.

  15. Environmental assessment for the Waste Water Treatment Facility at the West Valley Demonstration Project and finding of no significant impact

    International Nuclear Information System (INIS)

    1992-01-01

    The possible environmental impacts from the construction and operation of a waste water treatment facility for the West Valley Demonstration Project are presented. The West Valley Project is a demonstration project on the solidification of high-level radioactive wastes. The need for the facility is the result of a rise in the work force needed for the project which rendered the existing sewage treatment plant incapable of meeting the nonradioactive waste water treatment needs

  16. The ORNL (Oak Ridge National Laboratory)/Y-12 sludge detoxification demonstration project

    International Nuclear Information System (INIS)

    Padgett, D.G.

    1988-01-01

    A wide variety of mixed waste streams exist at DOE facilities nation-wide. Currently, most of these wastes are being stored in permitted facilities while methodologies are being developed to handle, treat and dispose of these wastes. The purpose of this demonstration project, conducted at Martin Marietta's K-25 Facility in July and August of 1988, was to gather data on the technical and/or economic feasibility of applying an innovative, experimental technology to the treatment of a mixed waste stream. Specifically the goal of the demonstration is to treat a listed hazardous waste containing depleted uranium and other trace isotopes in such a fashion as to produce a product which could subsequently be delisted and disposed of under current burial practices. This paper describes the methodology used in conducting the demonstration and the technology which was employed

  17. Strategy Guideline: Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Savage, C.; Hunt, A.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  18. Strategy Guideline. Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, A.; Savage, C.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  19. Rural interdisciplinary mental health team building via satellite: a demonstration project.

    Science.gov (United States)

    Cornish, Peter A; Church, Elizabeth; Callanan, Terrence; Bethune, Cheri; Robbins, Carl; Miller, Robert

    2003-01-01

    This paper reports on the results of a demonstration project that examined the role of telehealth/telemedicine (hereafter referred to as telehealth) in providing interdisciplinary mental health training and support to health professionals in a rural region of Atlantic Canada. Special emphasis was placed on addressing the question of how training might affect interdisciplinary collaboration among the rural health professionals. Five urban mental health professionals from three disciplines provided training and support via video-satellite and internet, print and video resources to 34 rural health and community professionals. In order to assess the rural community's needs and the impact of the interventions, questionnaires were administered and on-site interviews were conducted before and after the project. Throughout the project, field notes were recorded and satisfaction ratings were obtained. Satisfaction with the video-satellite presentations was high and stable, with the exception of one session when signal quality was very poor. Rural participants were most satisfied with opportunities for interaction and least satisfied with the variable quality of the video transmission signal. High staff turnover among rural professionals resulted in insufficient power to permit statistical analysis. Positive reports of the project impact included expanded knowledge and heightened sensitivity to mental health issues, increased cross-disciplinary connections, and greater cohesion among professionals. The results suggest that, with some refinements, telehealth technology can be used to facilitate mental health training and promote interdisciplinary collaboration among professionals in a rural setting.

  20. Summary of the evidence file demonstrating completion of the NIF Project Completion Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Haynam, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-04

    This document summarizes the results of performance verification tests on NIF that demonstrate it has met its performance-related Project Completion Criteria (PCC). It includes measurements made on NIF with the NIF diagnostics, the calibration of these diagnostics and the supporting analyses that verify the NIF performance criteria have been met.

  1. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-04-01

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  2. Canada's stature in international research community enhanced with awarding of nine major projects by CFI

    CERN Multimedia

    2002-01-01

    The Canadian Foundation for Innovation has announced it will fund nine major projects aimed at increasing Canadian research infrastructure and providing access for Canadian researchers to international facilities (1 page).

  3. Environmental monitoring six month report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Furnari, J.A.; Craig, P.M.

    1989-05-01

    The Fiscal Year 1989 Six Month Report is the fourth in a series of semi-annual Tumulus Disposal Demonstration Project (TDDP) data summary reports. This data summary spans the time from start of operations in June 1987 through the end of March 1989 with particular emphasis on the last six months: October 1988 through March 1989. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. These data are being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment. Comparisons are made between pre- and post-operational data and data collected during size month period ending March 31, 1989. No significant environmental impacts have been found since operations have begun. 13 refs., 28 figs., 12 tabs

  4. NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

    Science.gov (United States)

    Bull, John S.; Brown, Richard; Friedland, Peter; Wong, Carla M.; Bates, William

    1987-01-01

    A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

  5. Theme II Joint Work Plan -2017 Collaboration and Knowledge Sharing on Large-scale Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiaoliang [World Resources Inst. (WRI), Washington, DC (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-25

    This effort is designed to expedite learnings from existing and planned large demonstration projects and their associated research through effective knowledge sharing among participants in the US and China.

  6. WSF Biodiesel Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  7. DOE's annealing prototype demonstration projects

    International Nuclear Information System (INIS)

    Warren, J.; Nakos, J.; Rochau, G.

    1997-01-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy's Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana's Marble Hill nuclear power plant. The MPR team's annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company's nuclear power plant at Midland, Michigan. This paper describes the Department's annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges

  8. Project to demonstrate potential energy savings from industrial customers. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The full potential for electric load management was determined with respect to the industrial sector by adopting direct load management techniques. Certain options available to regulatory authorities and individual utilities to conserve energy are highlighted. By conducting a demonstration project on a representative sample of primary industrial customers, information could be obtained on the potential impact of direct load management methods and other end-use conservation programs on a system-wide basis or multi-system-wide basis. The study was conducted by the Michigan Public Service Commission in cooperation with the Detroit Edison Company.

  9. Electric vehicle demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Ouellet, M. [National Centre for Advanced Transportation, Saint-Jerome, PQ (Canada)

    2010-07-01

    The desirable characteristics of Canadian projects that demonstrate vehicle use in real-world operation and the appropriate mechanism to collect and disseminate the monitoring data were discussed in this presentation. The scope of the project was on passenger cars and light duty trucks operating in plug-in electric vehicle (PHEV) or battery electric vehicle modes. The presentation also discussed the funding, stakeholders involved, Canadian travel pattern analysis, regulatory framework, current and recent electric vehicle demonstration projects, and project guidelines. It was concluded that some demonstration project activities may have been duplicated as communication between the proponents was insufficient. It was recommended that data monitoring using automatic data logging with minimum reliance on logbooks and other user entry should be emphasized. figs.

  10. Project WAGR: The UK demonstration project for power reactor decommissioning - removing the core and looking to completion

    International Nuclear Information System (INIS)

    Benest, T. G.

    2003-01-01

    delivered the required performance. In such cases, simple tooling and manual intervention have been adopted to maintain the project ahead of programme and below the dose budget. For campaigns where manual intervention was precluded by high dose rates, the contractor has undertaken a risk assessment of each task and elected to develop a number of different tools to cover the most likely risks. Although this strategy incurs costs for tools that may never be utilised, these costs are dwarfed by the project costs of potential delays. Excellent progress has been maintained throughout the remote dismantling with the reliability of the equipment and the experience of the workforce being major contributors to the success. Management arrangements have also contributed to the current excellent programme position. The close working relationship between UKAEA and their prime contractor, and management of the interfaces with the regulators, has enabled problems to be identified early and then dealt with quickly and effectively. The current phase of operations is now planned for completion in early 2005 over 18 months ahead of programme. Currently the WAGR project has operated for over 6 years without a lost time accident to either UKAEA staff or any of the contractor's operatives. In the last 12 months, the maximum radiation dose to an individual was <1.0 mSv. To date, 270 tonnes of graphite and 206 tonnes of steel have been encapsulated. 38 boxes of low level waste have been sent, or are awaiting transport, to BNFL's Drigg site for disposal, and a further 102 boxes of ILW are now stored on-site pending the availability of a national facility. Thus far the UKAEA WAGR project is well ahead of programme, achieving all its objectives and demonstrating to a world-wide audience that a power reactor can be decommissioned safely and efficiently shortly after shutdown

  11. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  12. 20 CFR 404.1599 - Work incentive experiments and rehabilitation demonstration projects in the disability program.

    Science.gov (United States)

    2010-04-01

    ... the advantages and disadvantages of altering certain limitations and conditions that apply to title II... years from the start of the experiment or demonstration project). [48 FR 7575, Feb. 23, 1983, as amended...

  13. Advanced system demonstration for utilization of biomass as an energy source. Volume I. Scope and design criteria and project summary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The information in this document is the result of an intensive engineering effort to demonstrate the feasibility of biomass-fueled boilers in cogeneration applications. This design package is based upon a specific site in the State of Maine. However, the design is generic in nature and could serve as a model for other biomass conversion facilities located anywhere biomass is abundant. The project's purpose and summary information are presented: the plant, its concept of operation; and other overall information are described. The capital cost estimate for the plant, and the basis upon which it was obtained are given; a schedule of key milestones and activities required to construct the plant and put it into operation is presented; and the general findings in areas that affect the viability of the project are discussed. The technical design, biomass study, environmental impact, commercialization, and economic factors are addressed. Each major plant area and the equipment and facilities that each includes are discussed in depth. Some overall plant requirements, including noise control, reliability, maintainability, and safety, are detailed. The results of each study relating to alternatives considered for optimizing plant operation parameters and specific system process schemes are briefly presented. All economic factors that affect the feasibility and viability of the biomass project are defined and evaluated.

  14. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  15. Pre-project study on a demonstration plant for seawater desalination using a nuclear heating reactor in Morocco

    International Nuclear Information System (INIS)

    Achour, M.

    2000-01-01

    This paper gives in the first part detailed information on the pre-project study on a demonstration plant for seawater desalination using heating reactor implemented by both Moroccan and Chinese sides. The main findings of the pre-project study are given in the second part. (author)

  16. Influences on parental acceptance of HPV vaccination in demonstration projects in Uganda and Vietnam.

    Science.gov (United States)

    Galagan, Sean R; Paul, Proma; Menezes, Lysander; LaMontagne, D Scott

    2013-06-26

    This study investigates the effect of communication strategies on human papillomavirus (HPV) vaccine uptake in HPV vaccine demonstration projects in Uganda and Vietnam. Secondary analysis was conducted on data from surveys of a representative sample of parents and guardians of girls eligible for HPV vaccine, measuring three-dose coverage achieved in demonstration projects in 2008-2010. Univariate and multivariate logistic regression analysis calculated the unadjusted and adjusted odds of receiving at least one dose of HPV vaccine depending on exposure to community influencers; information, education, and communication (IEC) channels; and demographic factors. This study found that exposure to community influencers was associated with HPV vaccine uptake in a multivariate model controlling for other factors. Exposure to non-interactive IEC channels was only marginally associated with HPV vaccine uptake. These results underscore the need of HPV vaccine programs in low- and middle-income countries to involve and utilize key community influencers and stakeholders to maximize HPV vaccine uptake. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  18. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  19. 78 FR 33051 - Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson...

    Science.gov (United States)

    2013-06-03

    ... DEPARTMENT OF AGRICULTURE Natural Resources Conservation Service Non-Rock Alternatives to...-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16), Iberia, Jefferson, and... and environmental limitations preclude the use of rock structures. The shoreline protection systems...

  20. West Valley demonstration project: alternative processes for solidifying the high-level wastes

    International Nuclear Information System (INIS)

    Holton, L.K.; Larson, D.E.; Partain, W.L.; Treat, R.L.

    1981-10-01

    In 1980, the US Department of Energy (DOE) established the West Valley Solidification Project as the result of legislation passed by the US Congress. The purpose of this project was to carry out a high level nuclear waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The DOE authorized the Pacific Northwest Laboratory (PNL), which is operated by Battelle Memorial Institute, to assess alternative processes for treatment and solidification of the WNYNSC high-level wastes. The Process Alternatives Study is the suject of this report. Two pretreatment approaches and several waste form processes were selected for evaluation in this study. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied. The terminal waste form processes considered were: borosilicate glass, low-alkali glass, marbles-in-lead matrix, and crystallinolecular potential and molecular dynamics calculations of the effect are yet to be completed. Cous oxide was also investigated. The reaction is first order in nitrite ion, second order in hydrogen ion, and between zero and first order in hydroxylamine monosulfonate, depending on the concentration

  1. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  2. The advanced linked extended reconnaissance and targeting technology demonstration project

    Science.gov (United States)

    Cruickshank, James; de Villers, Yves; Maheux, Jean; Edwards, Mark; Gains, David; Rea, Terry; Banbury, Simon; Gauthier, Michelle

    2007-06-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing key operational needs of the future Canadian Army's Surveillance and Reconnaissance forces by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. We discuss concepts for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as beyond line-of-sight systems such as a mini-UAV and unattended ground sensors. The authors address technical issues associated with the use of fully digital IR and day video cameras and discuss video-rate image processing developed to assist the operator to recognize poorly visible targets. Automatic target detection and recognition algorithms processing both IR and visible-band images have been investigated to draw the operator's attention to possible targets. The machine generated information display requirements are presented with the human factors engineering aspects of the user interface in this complex environment, with a view to establishing user trust in the automation. The paper concludes with a summary of achievements to date and steps to project completion.

  3. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  4. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.

    1991-12-01

    The West Valley Demonstration project was established by an act of Congress in 1980 to solidify the high level radioactive liquid wastes produced from operation of the Western New York Nuclear Services Center from 1966 to 1972. The waste will be solidified as borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems

  5. Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1998-01-01

    The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation

  6. HTI retrieval demonstration project execution plan

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1997-01-01

    This plan describes the process for demonstrating the retrieval of difficult Hanford tank waste forms utilizing commercial technologies and the private sector to conduct the operations. The demonstration is to be conducted in Tank 241-C-106

  7. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA -- USEPA DEMONSTRATION PROJECT AT ROLLINSFORD, NH, SIX MONTH EVALUTION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Rollinsford Water and Sewer District facility in Rollinsford, NH. The objectives of the project are to...

  8. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA, USEPA DEMONSTRATION PROJECT AT RIMROCK, AZ, SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Rimrock, AZ. The objectives of the project are to evaluate the effectiveness of AdEdge Arsenic Package Uni...

  9. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  11. Large scale gas chromatographic demonstration system for hydrogen isotope separation

    International Nuclear Information System (INIS)

    Cheh, C.H.

    1988-01-01

    A large scale demonstration system was designed for a throughput of 3 mol/day equimolar mixture of H,D, and T. The demonstration system was assembled and an experimental program carried out. This project was funded by Kernforschungszentrum Karlsruhe, Canadian Fusion Fuel Technology Projects and Ontario Hydro Research Division. Several major design innovations were successfully implemented in the demonstration system and are discussed in detail. Many experiments were carried out in the demonstration system to study the performance of the system to separate hydrogen isotopes at high throughput. Various temperature programming schemes were tested, heart-cutting operation was evaluated, and very large (up to 138 NL/injection) samples were separated in the system. The results of the experiments showed that the specially designed column performed well as a chromatographic column and good separation could be achieved even when a 138 NL sample was injected

  12. Scaled Vitrification System III (SVS III) Process Development and Laboratory Tests at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Jain, V.; Barnes, S.M.; Bindi, B.G.; Palmer, R.A.

    2000-01-01

    At the West Valley Demonstration Project (WVDP),the Vitrification Facility (VF)is designed to convert the high-level radioactive waste (HLW)stored on the site to a stable glass for disposal at a Department of Energy (DOE)-specified federal repository. The Scaled Vitrification System III (SVS-III)verification tests were conducted between February 1995 and August 1995 as a supplemental means to support the vitrification process flowsheet, but at only one seventh the scale.During these tests,the process flowsheet was refined and optimized. The SVS-III test series was conducted with a focus on confirming the applicability of the Redox Forecasting Model, which was based on the Index of Feed Oxidation (IFO)developed during the Functional and Checkout Testing of Systems (FACTS)and SVS-I tests. Additional goals were to investigate the prototypical feed preparation cycle and test the new target glass composition. Included in this report are the basis and current designs of the major components of the Scale Vitrification System and the results of the SVS-III tests.The major subsystems described are the feed preparation and delivery, melter, and off-gas treatment systems. In addition,the correlation between the melter's operation and its various parameters;which included feed rate,cold cap coverage,oxygen reduction (redox)state of the glass,melter power,plenum temperature,and airlift analysis;were developed

  13. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T.L. [AECOM Canada Limited, Markham, ON (Canada)

    2011-07-01

    Any major project development, including those related to nuclear activities in Canada, will certainly impose a wide range of effects and consequences for a host community and region. These wide ranging effects can be positive as well as negative and last for varying time periods. However, the challenge is not to simply identify effects of a project and then mitigate and/or compensate for them. Rather, we have witnessed a transition in recent years that gaining community social acceptance for projects has taken on new meaning. Specifically, communities have taken a 'longer view' of themselves and are more interested in how the project will enhance their long-term well-being. There is considerable evidence to suggest that assessing and demonstrating effects on community well-being has become the focal point for community understanding and decision-making about how to proceed with any new development. This paper will examine what the term 'community well-being' is and how it applies to gaining social acceptance for major nuclear projects in Canada. Insights and examples will be gathered from a range of cases in Canada and elsewhere to demonstrate its diverse meaning and application. A discussion of its application to gaining social acceptance for nuclear projects will be generic in nature and provide a useful framework that can be adapted to the meet the needs in unique situations. There is extensive literature with a cornucopia of subject headers including: community well-being, sustainable development, sustainability, social capital, social well-being, participatory development, and so on. In many cases, these and other terms are used interchangeably or applied as a sub-set to another term. There is no distinct rule or collective wisdom regarding which term to use under different circumstances or situations. Suffice it to say that the notion of community well-being, sustainable development and the like are not new terms or concepts, even in

  14. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    International Nuclear Information System (INIS)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T.L.

    2011-01-01

    Any major project development, including those related to nuclear activities in Canada, will certainly impose a wide range of effects and consequences for a host community and region. These wide ranging effects can be positive as well as negative and last for varying time periods. However, the challenge is not to simply identify effects of a project and then mitigate and/or compensate for them. Rather, we have witnessed a transition in recent years that gaining community social acceptance for projects has taken on new meaning. Specifically, communities have taken a 'longer view' of themselves and are more interested in how the project will enhance their long-term well-being. There is considerable evidence to suggest that assessing and demonstrating effects on community well-being has become the focal point for community understanding and decision-making about how to proceed with any new development. This paper will examine what the term 'community well-being' is and how it applies to gaining social acceptance for major nuclear projects in Canada. Insights and examples will be gathered from a range of cases in Canada and elsewhere to demonstrate its diverse meaning and application. A discussion of its application to gaining social acceptance for nuclear projects will be generic in nature and provide a useful framework that can be adapted to the meet the needs in unique situations. There is extensive literature with a cornucopia of subject headers including: community well-being, sustainable development, sustainability, social capital, social well-being, participatory development, and so on. In many cases, these and other terms are used interchangeably or applied as a sub-set to another term. There is no distinct rule or collective wisdom regarding which term to use under different circumstances or situations. Suffice it to say that the notion of community well-being, sustainable development and the like are not new terms or concepts, even in

  15. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T. L. [AECOM Canada Limited, Markham, ON (Canada)

    2011-07-01

    Any major project development, including those related to nuclear activities in Canada, will certainly impose a wide range of effects and consequences for a host community and region. These wide ranging effects can be positive as well as negative and last for varying time periods. However, the challenge is not to simply identify effects of a project and then mitigate and/or compensate for them. Rather, we have witnessed a transition in recent years that gaining community social acceptance for projects has taken on new meaning. Specifically, communities have taken a 'longer view' of themselves and are more interested in how the project will enhance their long-term well-being. There is considerable evidence to suggest that assessing and demonstrating effects on community well-being has become the focal point for community understanding and decision-making about how to proceed with any new development. This paper will examine what the term 'community well-being' is and how it applies to gaining social acceptance for major nuclear projects in Canada. Insights and examples will be gathered from a range of cases in Canada and elsewhere to demonstrate its diverse meaning and application. A discussion of its application to gaining social acceptance for nuclear projects will be generic in nature and provide a useful framework that can be adapted to the meet the needs in unique situations. There is extensive literature with a cornucopia of subject headers including: community well-being, sustainable development, sustainability, social capital, social well-being, participatory development, and so on. In many cases, these and other terms are used interchangeably or applied as a sub-set to another term. There is no distinct rule or collective wisdom regarding which term to use under different circumstances or situations. Suffice it to say that the notion of community well-being, sustainable development and the like are not new terms or concepts, even in Canada. Despite the wide

  16. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the

  17. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  18. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  19. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Climax, MN site. The objectives of the project are to evaluate (1) the effectiveness of Kinetico’s Macrolite®...

  20. Processing the THOREX waste at the West Valley demonstration project

    International Nuclear Information System (INIS)

    Barnes, S.M.; Schiffhauer, M.A.

    1994-01-01

    This paper focuses on several options for neutralizing the THOREX and combining it with the PUREX wastes. Neutralization testing with simulated wastes (nonradioactive chemicals) was performed to evaluate the neutralization reactions and the reaction product generation. Various methods for neutralizing the THOREX solution were examined to determine their advantages and disadvantages relative to the overall project objectives and compatibility with the existing process. The primary neutralization process selection criteria were safety and minimizing the potential delays prior to vitrification. The THOREX neutralization method selected was direct addition to the high pH PUREX wastes within Tank 8D-2. Laboratory testing with simulated waste has demonstrated rapid neutralization of the THOREX waste acid. Test results for various direct addition scenarios has established the optimum process operating conditions which provide the largest safety margins

  1. Design and analysis of electrical energy storage demonstration projects on UK distribution networks

    International Nuclear Information System (INIS)

    Lyons, P.F.; Wade, N.S.; Jiang, T.; Taylor, P.C.; Hashiesh, F.; Michel, M.; Miller, D.

    2015-01-01

    Highlights: • Results of an EES system demonstration project carried out in the UK. • Approaches to the design of trials for EES and observation on their application. • A formalised methodology for analysis of smart grids trials. • Validated models of energy storage. • Capability of EES to connect larger quantities of heat pumps and PV is evaluated. - Abstract: The UK government’s CO 2 emissions targets will require electrification of much of the country’s infrastructure with low carbon technologies such as photovoltaic panels, electric vehicles and heat pumps. The large scale proliferation of these technologies will necessitate major changes to the planning and operation of distribution networks. Distribution network operators are trialling electrical energy storage (EES) across their networks to increase their understanding of the contribution that it can make to enable the expected paradigm shift in generation and consumption of electricity. In order to evaluate a range of applications for EES, including voltage control and power flow management, installations have taken place at various distribution network locations and voltage levels. This article reports on trial design approaches and their application to a UK trial of an EES system to ensure broad applicability of the results. Results from these trials of an EES system, low carbon technologies and trial distribution networks are used to develop validated power system models. These models are used to evaluate, using a formalised methodology, the impact that EES could have on the design and operation of future distribution networks

  2. Michigan Oncology Medical Home Demonstration Project: First-Year Results.

    Science.gov (United States)

    Kuntz, Gordon; Tozer, Jane; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-03-01

    The Michigan Oncology Medical Home Demonstration Project (MOMHDP) is an innovative multipractice oncology medical home model, supported by payment reform. Sponsored by Priority Health, Physician Resource Management, and ION Solutions, MOMHDP includes four oncology practices and 29 physicians. Oncology practices used existing technologies, with MOMHDP providing evidence-based treatment guideline selection and compliance tracking, automated physician order entry, a patient portal, symptom management/standardized nurse triage, and advance care planning. To support changes in care and administrative models and to focus on quality, MOMHDP modifies provider payments. The program replaces the average sales price payment methodology with a drug acquisition reimbursement plus a care management fee, calculated to increase total drug reimbursement. Additionally, it reimburses for chemotherapy and treatment planning and advance care planning consultation. There is also a shared savings opportunity. MOMHDP will be enhanced in its second year to include a survivorship program, patient distress screening, imaging guidelines, and standardized patient satisfaction surveys. Priority Health patients receiving chemotherapy for a cancer diagnosis were recruited to the program. Results for this group were compared with a control group of patients from a prior period. In addition to the financial results, the project also accomplished the following: (1) adherence to practice-selected guidelines, (2) institution of advance care planning, (3) effective and standardized symptom management; and (4) payment reform. We have identified a number of critical success factors: strong payer/provider collaboration built on trust through transparent use and cost data; timing of clinical standardization must come from the practices, so they can effectively absorb new approaches; having comprehensive, written program documentation and consistently applied training facilitate practice understanding

  3. A Demonstration Project of Speech Training for the Preschool Cleft Palate Child. Final Report.

    Science.gov (United States)

    Harrison, Robert J.

    To ascertain the efficacy of a program of language and speech stimulation for the preschool cleft palate child, a research and demonstration project was conducted using 137 subjects (ages 18 to 72 months) with defects involving the soft palate. Their language and speech skills were matched with those of a noncleft peer group revealing that the…

  4. Biorefinery Demonstration Project Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, David [University of Georgia Research Foundation, Inc., Athens, GA (United States)

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  5. Minerals and energy: major development projects - April 2005 listing

    Energy Technology Data Exchange (ETDEWEB)

    Ian Haine (and others) [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2005-06-01

    The article describes trends in project development and investment in the minerals and energy sector in Australia. It lists competed projects and committed projects. Black coal projects completed during November 2004 to April 2005 were: Dendrobium underground and Mandalong longwall mining expansion projects in New South Wales and development of Curragh North and Eaglefield opencut mine in Queensland. One of the more significant newly listed projects is Macarthur Coal's Queensland Coke Project near Rockhampton. Capital cost and values of projects are included. The full listing of 229 projects is available electronically from ABARE. The list is released around May and November each year. 10 figs., 4 tabs.

  6. Functional description of the West Valley Demonstration Project Vitrification Facility

    International Nuclear Information System (INIS)

    Borisch, R.R.; McMahon, C.L.

    1990-07-01

    The primary objective of the West Valley Demonstration Project (WVDP) is the solidification of approximately 2.1 million liters (560,000 gallons) of high-level radioactive waste (HLW) which resulted from the operation of a nuclear fuel reprocessing plant. Since the original plant was not built to accommodate the processing of waste beyond storage in underground tanks, HLW solidification by vitrification presented numerous engineering challenges. Existing facilities required redesign and conversion to meet their new purpose. Vitrification technology and systems needed to be created and then tested. Equipment modifications, identified from cold test results, were incorporated into the final equipment configuration to be used for radioactive (hot) operations. Cold operations have defined the correct sequence and optimal functioning of the equipment to be used for vitrification and have verified the process by which waste will be solidified into borosilicate glass

  7. Health risk assessment for a MWC ash utilization demonstration project

    International Nuclear Information System (INIS)

    Roffman, H.K.

    1992-01-01

    A Health Risk Assessment (HRA) was conducted for the proposed joint Hennepin County/Municipal Services Corporation (MSC) MSW Ash Utilization Demonstration Project, in which combined HERC ash was shipped to the MSC Pilot Plan near Atlanta, Georgia and used in the production of a synthetic aggregate. The synthetic aggregate, or TAP, will serve as a partial replacement for natural aggregates in a section of bituminous pavement that is proposed to be constructed on Pioneer Trail in the City of Corcoran, Minnesota. In this paper, the assessment compares the following three scenarios: a section of roadway paved using the MSC synthetic aggregate product (TAP) as a replacement for 30 percent of the natural aggregates used in bituminous pavement; a section of regular bituminous (asphalt) pavement; and a section of unpaved road currently in place at the site

  8. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  9. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  10. Training Teens to Teach Agricultural Biotechnology: A National 4-H Science Demonstration Project

    Directory of Open Access Journals (Sweden)

    Chad Ripberger

    2013-12-01

    Full Text Available This article discusses a National 4-H Science agricultural biotechnology demonstration project and the impact of the pilot programs on the teenage leaders and teachers. A total of 82 teenagers were extensively trained, who in turn, engaged 620 youth participants with agricultural biotechnology education in afterschool and summer programs in five states. This article details the national and state level trainings for these teen teachers as well as the content rich partners from agribusinesses, agricultural commodity groups, and universities who supported their involvement. The impact on the content knowledge, science process and life skills, and program development and implementation skills of the teen leaders and teachers was evaluated using multiple instruments over multiple administrations (pre-training, post-training, and post-teaching. Results indicate significant gains in most areas assessed. Project recommendations and future plans are also discussed.

  11. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  12. Measuring radiation damage dynamics by pulsed ion beam irradiation: 2016 project annual report

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, Sergei O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-01-04

    The major goal of this project is to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploits a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. For Year 3, this project had the following two major milestones: (i) the demonstration of the measurement of thermally activated defect-interaction processes by pulsed ion beam techniques and (ii) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, both of these milestones have been met.

  13. ARAMIS project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance.

    Science.gov (United States)

    de Dianous, Valérie; Fiévez, Cécile

    2006-03-31

    Over the last two decades a growing interest for risk analysis has been noted in the industries. The ARAMIS project has defined a methodology for risk assessment. This methodology has been built to help the industrialist to demonstrate that they have a sufficient risk control on their site. Risk analysis consists first in the identification of all the major accidents, assuming that safety functions in place are inefficient. This step of identification of the major accidents uses bow-tie diagrams. Secondly, the safety barriers really implemented on the site are taken into account. The barriers are identified on the bow-ties. An evaluation of their performance (response time, efficiency, and level of confidence) is performed to validate that they are relevant for the expected safety function. At last, the evaluation of their probability of failure enables to assess the frequency of occurrence of the accident. The demonstration of the risk control based on a couple gravity/frequency of occurrence is also possible for all the accident scenarios. During the risk analysis, a practical tool called risk graph is used to assess if the number and the reliability of the safety functions for a given cause are sufficient to reach a good risk control.

  14. A Pilot Project Demonstrating that Combat Medics Can Safely Administer Parenteral Medications in the Emergency Department.

    Science.gov (United States)

    Schauer, Steven G; Cunningham, Cord W; Fisher, Andrew D; DeLorenzo, Robert A

    2017-12-01

    Introduction Select units in the military have improved combat medic training by integrating their functions into routine clinical care activities with measurable improvements in battlefield care. This level of integration is currently limited to special operations units. It is unknown if regular Army units and combat medics can emulate these successes. The goal of this project was to determine whether US Army combat medics can be integrated into routine emergency department (ED) clinical care, specifically medication administration. Project Design This was a quality assurance project that monitored training of combat medics to administer parenteral medications and to ensure patient safety. Combat medics were provided training that included direct supervision during medication administration. Once proficiency was demonstrated, combat medics would prepare the medications under direct supervision, followed by indirect supervision during administration. As part of the quality assurance and safety processes, combat medics were required to document all medication administrations, supervising provider, and unexpected adverse events. Additional quality assurance follow-up occurred via complete chart review by the project lead. Data During the project period, the combat medics administered the following medications: ketamine (n=13), morphine (n=8), ketorolac (n=7), fentanyl (n=5), ondansetron (n=4), and other (n=6). No adverse events or patient safety events were reported by the combat medics or discovered during the quality assurance process. In this limited case series, combat medics safely administered parenteral medications under indirect provider supervision. Future research is needed to further develop this training model for both the military and civilian setting. Schauer SG , Cunningham C W, Fisher AD , DeLorenzo RA . A pilot project demonstrating that combat medics can safely administer parenteral medications in the emergency department. Prehosp Disaster Med. 2017;32(6):679-681.

  15. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTION MEDIA USEPA DEMONSTRATION PROJECT AT BROWN CITY, MI SIX MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project in Brown City, MI. The objectives of the project are to evaluate the effectiveness of Severn Trent Services (...

  16. The Fort McMurray Demonstration Project in Social Marketing: no demonstrable effect on already falling injury rates following intensive community and workplace intervention.

    Science.gov (United States)

    Guidotti, Tee L; Deb, Pooja; Bertera, Robert; Ford, Lynda

    2009-10-01

    The Fort McMurray Demonstration Project in Social Marketing attempted to achieve mutually reinforcing effects from thematically coordinated educational and awareness efforts in the community as a whole and in the workplace and the inclusion of occupational safety within the framework of a community health promotion project. The study community was Fort McMurray, a small, industrial city in northern Alberta. The Mistahiai Health Region, several hundred kilometers to the west and also dominated by one city, Grande Prairie, served as the reference community. The intervention was based on media and events staged at public events, with supporting educational activities in schools and the community. It relied heavily on community-based partners and volunteers. Data on healthcare utilization of selected preventable injuries were obtained from Alberta Health for the time period 1990-1996 for the Regional Health Authorities of Northern Lights, where the only large population centre is Fort McMurray, and Mistahia. Age-adjusted aggregate injury rates were analyzed for evidence of an effect of the intervention. Severity was measured by proxy, using the number of diagnostic claims submitted for reimbursement for medical services in a given year. The communities differed in age-specific injury rates, with Fort McMurray showing higher rates for residents aged less than 55. Young adults and older adolescents showed higher levels of severity. Injury rates fell substantially and at similar rates in both communities over the five-year period. However, in both communities injury rates were already falling before the intervention in Fort McMurray began and continued to fall at about the same rate, slowing toward the end of the period. No evidence was found for an effect of the Project or for acceleration of the reduction in injury frequency in the intervention area. Over the period, fewer medical services were delivered in office settings and more in emergency rooms, in both

  17. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report

  18. Environmental monitoring annual report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Craig, P.M.

    1989-01-01

    The Fiscal Year 1988 Annual Report is the third in a series of semi-annual Tumulus Development Disposal Project data summary reports. The reporting schedule has been modified to correspond to the fiscal years and the subcontractor contract periods. This data summary spans the time from start of operations in June 1987 through the end of September 1988. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. This data is being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment for the TDDP. Approximately one year of pre-operational data were collected prior to operations beginning on April 11, 1988. Comparisons are made between pre- and post-operational data. No significant environmental impacts have been found since operations have begun. 10 refs., 21 figs., 22 tabs

  19. Demonstration project: Load management on the user side at power shortages

    International Nuclear Information System (INIS)

    Lindskoug, Stefan

    2005-10-01

    The risk for power shortages during extreme cold weather has increased in Sweden. Comments are made that high electricity spot prices are important for holding down the demand. Through the consumers' higher price sensitivity, the electricity system can be operated with lower reserve capacity. The objective of the demonstration project is to show methods for reducing the electricity demand at the national level at high spot prices. An important prerequisite is that the measures must be profitable for all parties involved. Four separate studies were made, two concerning households, one industry and one for the district heating sector. The conclusion from the studies is that load management on the customer's side is an economic alternative to investment in new production capacity

  20. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-16

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  1. Energy efficient ventilation based on demand humidity control. Demonstration project with 49 apartments in Soenderborg

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The aim of the project is to demonstrate how the overall energy consumption in apartment buildings can be reduced through a combination of: 1) Energy efficient ventilation based on demand humidity control; 2) Energy efficient design of the building shell including passive solar and seasonally flexible sunspaces; 3) Use of low temperature heating system. The 3 blocks in the project, each with 16 apartments, are furnished with 3 different ventilation systems: 1) Standard exhaust system according to building codes; 2) Ventilation system with humidity control. Each room is furnished with an air inlet valve controlled by a processor, which monitors the humidity; 3) Standard ventilation system with heat recovery. (au)

  2. Photovoltaic demonstration project. Final report

    International Nuclear Information System (INIS)

    Jicarilla Apache Tribe

    2002-01-01

    The Jicarilla Apache Nation is in Rio Arriba County in North Central New Mexico. The photovoltaic project was installed at the Dulce High School in the town of Dulce. Dulce is in the most northern part of the reservation near the New Mexico/Colorado boundary and can be reached from the New Mexico State Capitol in Santa Fe, hence to the town of Chama along U.S. Highway 84 to the junction of U.S. Highway 64. Dulce is about 12 miles west of the junction along U.S. Highway 64. Dulce community is in the mountainous part of the Nation with a population of about 4000. No industry exists in the community, however, a few commercial sites do exist such as a motel, restaurants, gas stations, food and liquor stores

  3. Learning From Demonstration?

    DEFF Research Database (Denmark)

    Koch, Christian; Bertelsen, Niels Haldor

    2014-01-01

    Demonstration projects are often used in the building sector to provide a basis for using new processes and/or products. The climate change agenda implies that construction is not only required to deliver value for the customer, cost reductions and efficiency but also sustainable buildings....... This paper reports on an early demonstration project, the Building of a passive house dormitory in the Central Region of Denmark in 2006-2009. The project was supposed to deliver value, lean design, prefabrication, quality in sustainability, certification according to German standards for passive houses......, and micro combined heat and power using hydrogen. Using sociological and business economic theories of innovation, the paper discusses how early movers of innovation tend to obtain only partial success when demonstrating their products and often feel obstructed by minor details. The empirical work...

  4. Technology Performance Report: Duke Energy Notrees Wind Storage Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wehner, Jeff [Duke Energy Renewables, Charlotte, NC (United States); Mohler, David [Duke Energy Renewables, Charlotte, NC (United States); Gibson, Stuart [Duke Energy Renewables, Charlotte, NC (United States); Clanin, Jason [Duke Energy Renewables, Charlotte, NC (United States); Faris, Don [Duke Energy Renewables, Charlotte, NC (United States); Hooker, Kevin [Duke Energy Renewables, Charlotte, NC (United States); Rowand, Michael [Duke Energy Renewables, Charlotte, NC (United States)

    2015-11-01

    Duke Energy Renewables owns and operates the Notrees Wind Farm in west Texas’s Ector and Winkler counties. The wind farm, which was commissioned in April 2009, has a total capacity of 152.6 MW generated by 55 Vestas V82 turbines, one Vestas 1-V90 experimental turbine, and 40 GE 1.5-MW turbines. The Vestas V82 turbines have a generating capacity of 1.65 MW each, the Vestas V90 turbine has a generating capacity of 1.86 MW, and the GE turbines have a generating capacity of 1.5 MW each. The objective of the Notrees Wind Storage Demonstration Project is to validate that energy storage increases the value and practical application of intermittent wind generation and is commercially viable at utility scale. The project incorporates both new and existing technologies and techniques to evaluate the performance and potential of wind energy storage. In addition, it could serve as a model for others to adopt and replicate. Wind power resources are expected to play a significant part in reducing greenhouse gas emissions from electric power generation by 2030. However, the large variability and intermittent nature of wind presents a barrier to integrating it within electric markets, particularly when competing against conventional generation that is more reliable. In addition, wind power production often peaks at night or other times when demand and electricity prices are lowest. Energy storage systems can overcome those barriers and enable wind to become a valuable asset and equal competitor to conventional fossil fuel generation.

  5. Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.; Brill, B.A.; Carl, D.E.

    1997-06-01

    The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented

  6. Project management in crisis situations

    Directory of Open Access Journals (Sweden)

    Agnieszka Goździewska-Nowicka

    2017-05-01

    Full Text Available In today’s methodologies of project management attention is increasingly paid to the crises-related issues. Modern economy and the turbulent environment cause that an emergingcrisis can pose a serious threat to the implementation of any undertaking. This article focuses on the presentation of the conditions and causes of crisis situations, the essence of projects, and their effective management. The major objective of the paper, however, is to demonstrate how companies implementing projects cope with the occurrence of a crisis situation.

  7. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  8. Technical safety appraisal of the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1989-09-01

    This report presents the results of one in a series of Technical Safety Appraisals (TSAs) being conducted of DOE nuclear operations by the Assistant Secretary for Environment, Safety, and Health Office of Safety Appraisals TSAs are one of the ititiatives announced by the Secretary of Energy on September 18, 1985, to enhance the DOE environment, safety and health program. This report presents the results of a TSA of the West Valley Demonstration Project (WVDP). The appraisal was conducted by a team of exerts assembled by the DOE Office of Safety Appraisal and was conducted during onsite visits of June 26-30 and July 10-21, 1989. West Valley, about 30 miles south of Buffalo, New York is the location of the only commercial nuclear fuel reprocessing facility operated in the United States. Nuclear Fuels Services, Inc. (NFS) operated the plant from 1966 to 1972 and processed about 640 metric tons of spent reactor fuel. The reprocessing operation generated about 560,000 gallons of high-level radioactive waste, which was transferred into underground tanks for storage. In 1972 NFS closed the plant and subsequently decided not to reopen it

  9. Low-cost rural surface alternatives : demonstration project.

    Science.gov (United States)

    2015-06-01

    The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to : granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa....

  10. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Rollinsford, NH, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Rollinsford, New Hampshire. The objectives of the project were to evaluate: 1) the effectiveness of AdEdge Technologies’ AD -33TM media ...

  11. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. U.S. EPA DEMONSTRATION PROJECT AT CLIMAX, MN. FINAL PERFORMANCE EVALUATION REPORT.

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project following one year of operation at the Climax, Minnesota, site. The objectives of the project were to evaluate: (1) the effectiveness of Kin...

  12. Building a partnership to evaluate school-linked health services: the Cincinnati School Health Demonstration Project.

    Science.gov (United States)

    Rose, Barbara L; Mansour, Mona; Kohake, Kelli

    2005-12-01

    The Cincinnati School Health Demonstration Project was a 3-year collaboration that evaluated school-linked health services in 6 urban elementary (kindergarten to eighth grade) schools. Partners from the Cincinnati Health Department, Cincinnati Public Schools, Cincinnati Children's Hospital Medical Center, and The Health Foundation of Greater Cincinnati wanted to determine if levels of school-linked care made a difference in student quality of life, school connectedness, attendance, emergency department use, and volume of referrals to health care specialists. School nurses, principals and school staff, parents and students, upper-level managers, and health service researchers worked together over a 2.5-year period to learn about and use new technology to collect information on student health, well-being, and outcome measures. Varying levels of school health care intervention models were instituted and evaluated. A standard model of care was compared with 2 models of enhanced care and service. The information collected from students, parents, nurses, and the school system provided a rich database on the health of urban children. School facilities, staffing, and computer technology, relationship building among stakeholders, extensive communication, and high student mobility were factors that influenced success and findings of the project. Funding for district-wide computerization and addition of school health staff was not secured by the end of the demonstration project; however, relationships among the partners endured and paved the way for future collaborations designed to better serve urban school children in Cincinnati.

  13. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  14. Staunton 1 Reclamation Demonstration Project. Progress report II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process on a 13.8-ha abandoned deep coal mine refuse site in southwestern Illinois. The procedure included collection of preconstruction environmental data, determination of the site's final land use, and development and implementation of a detailed site development plan. Approximately 9.3 ha of refuse material was recontoured, covered with a minimum of 30 cm of soil obtained on site, and seeded with a mixture of grasses and legumes. Hydrologic investigation indicates some improvement in groundwater quality. Surface water quality also has shown improvement, but development of the aquatic ecosystem in the newly-constructed pond is slow. Revegetation has been successful, and a protective plant cover has been established on most areas of the site. Soil tests indicate that acceptable plant growth media have been constructed; however, continued application of fertilizer and limestone will probably be necessary to maintain the vegetation. The soil microbial community has achieved total numbers equal to those of old fields, but species' diversity is low. Small mammals, birds, reptiles, and amphibians have invaded and are utilizing the site. The economic value of the site and adjacent property has increased substantially, and the area's aesthetic value has been enhanced significantly. The two-year period of intensive monitoring and evaluation has been utilized to develop recommendations for improving the designs of future reclamation efforts.

  15. Theory-based practice in a major medical centre.

    Science.gov (United States)

    Alligood, Martha Raile

    2011-11-01

    This project was designed to improve care quality and nursing staff satisfaction. Nursing theory structures thought and action as demonstrated by evidence of improvement in complex health-care settings. Nursing administrators selected Modelling and Role-Modelling (MRM) for the theory-based practice goal in their strategic plan. An action research approach structured implementation of MRM in a 1-year consultation project in 2001-2002. Quality of health care improved according to national quality assessment ratings, as well as patient satisfaction and nurse satisfaction. Modelling and Role-Modelling demonstrated capacity to structure nursing thought and action in patient care in a major medical centre. Uniformity of patient care language was valued by nurses as well as by allied health providers who wished to learn the holistic MRM style of practice. The processes of MRM and action research contributed to project success. A positive health-care change project was carried out in a large medical centre with action research. Introducing MRM theory-based practice was a beneficial decision by nursing administration that improved care and nurse satisfaction. Attention to nursing practice stimulated career development among the nurses to pursue bachelors, masters, and doctoral degrees. © 2011 Blackwell Publishing Ltd.

  16. Continued maturing of SOFC cell production technology and development and demonstration of SOFC stacks. Final report

    Energy Technology Data Exchange (ETDEWEB)

    2008-08-15

    The overall objective of the 6385 project was to develop stack materials, components and stack technology including industrial relevant manufacturing methods for cells components and stacks. Furthermore, the project should include testing and demonstration of the stacks under relevant operating conditions. A production of 6.829 cells, twenty 75-cell stacks and a number of small stacks was achieved. Major improvements were also made in the manufacturing methods and in stack design. Two test and demonstration activities were included in the project. The first test unit was established at H.C. OErsted power plant at the Copenhagen waterfront in order to perform test of SOFC stacks. The unit will be used for tests in other projects. The second demonstration unit is the alpha prototype demonstration in a system running on natural gas in Finland. The alpha prototype demonstration system with 24 TOFC (Topsoe Fuel Cell) stacks was established and started running in October 2007 and operational experience was gained in the period from October 2007 to February 2008. (auther)

  17. Pilot project - demonstration of capabilities and benefits of bridge load rating through physical testing : tech transfer summary.

    Science.gov (United States)

    2013-08-01

    This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...

  18. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI. Six-Month Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project are to evaluate 1) the effectiveness of Siemen...

  19. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. EPA DEMONSTRATION PROJECT AT QUEEN ANNES COUNTY, MARYLAND SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the community of Prospect Bay at Grasonville in Queen Anne’s County, MD. The objectives of the project were to ev...

  20. Arsenic Removal from Drinking Water by Iron Removal. U.S. EPA Demonstration Project at Sabin, MN. Six-Month Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Sabin, MN. The main objective of the project is to evaluate the effectiveness of the Kinetico FM-248-AS ars...

  1. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Taos, NM, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Town of Taos in New Mexico. The main objective of the project was to evaluate the effectiveness of Severn Trent Services’ (STS) SORB 33™ ad...

  2. Demonstration of advanced combustion NO(sub X) control techniques for a wall-fired boiler. Project performance summary, Clean Coal Technology Demonstration Program

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The project represents a landmark assessment of the potential of low-NO(sub x) burners, advanced overtire air, and neural-network control systems to reduce NO(sub x) emissions within the bounds of acceptable dry-bottom, wall-fired boiler performance. Such boilers were targeted under the Clean Air Act Amendments of 1990 (CAAA). Testing provided valuable input to the Environmental Protection Agency ruling issued in March 1994, which set NO(sub x) emission limits for ''Group 1'' wall-fired boilers at 0.5 lb/10(sup 6) Btu to be met by January 1996. The resultant comprehensive database served to assist utilities in effectively implementing CAAA compliance. The project is part of the U.S. Department of Energy's Clean Coal Technology Demonstration Program established to address energy and environmental concerns related to coal use. Five nationally competed solicitations sought cost-shared partnerships with industry to accelerate commercialization of the most advanced coal-based power generation and pollution control technologies. The Program, valued at over$5 billion, has leveraged federal funding twofold through the resultant partnerships encompassing utilities, technology developers, state governments, and research organizations. This project was one of 16 selected in May 1988 from 55 proposals submitted in response to the Program's second solicitation. Southern Company Services, Inc. (SCS) conducted a comprehensive evaluation of the effects of Foster Wheeler Energy Corporation's (FWEC) advanced overfire air (AOFA), low-NO(sub x) burners (LNB), and LNB/AOFA on wall-fired boiler NO(sub x) emissions and other combustion parameters. SCS also evaluated the effectiveness of an advanced on-line optimization system, the Generic NO(sub x) Control Intelligent System (GNOCIS). Over a six-year period, SCS carried out testing at Georgia Power Company's 500-MWe Plant Hammond Unit 4 in Coosa, Georgia. Tests proceeded in a logical sequence using rigorous statistical analyses to

  3. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  4. Astronomy LITE Demonstrations

    Science.gov (United States)

    Brecher, Kenneth

    2006-12-01

    Project LITE (Light Inquiry Through Experiments) is a materials, software, and curriculum development project. It focuses on light, optics, color and visual perception. According to two recent surveys of college astronomy faculty members, these are among the topics most often included in the large introductory astronomy courses. The project has aimed largely at the design and implementation of hands-on experiences for students. However, it has also included the development of lecture demonstrations that employ novel light sources and materials. In this presentation, we will show some of our new lecture demonstrations concerning geometrical and physical optics, fluorescence, phosphorescence and polarization. We have developed over 200 Flash and Java applets that can be used either by teachers in lecture settings or by students at home. They are all posted on the web at http://lite.bu.edu. For either purpose they can be downloaded directly to the user's computer or run off line. In lecture demonstrations, some of these applets can be used to control the light emitted by video projectors to produce physical effects in materials (e.g. fluorescence). Other applets can be used, for example, to demonstrate that the human percept of color does not have a simple relationship with the physical frequency of the stimulating source of light. Project LITE is supported by Grant #DUE-0125992 from the NSF Division of Undergraduate Education.

  5. 75 FR 71171 - Social Security Disability Program Demonstration Project: Benefit Offset National Demonstration...

    Science.gov (United States)

    2010-11-22

    ... project. Stage 2 Offset and Enhanced Benefits Counseling Treatment Group--We will assign approximately 3... treatment of earnings and the enhanced benefits counseling, depending on their treatment group. Alternate... Treatment Group be eligible for counseling services? A beneficiary assigned to this Stage 2 treatment group...

  6. Characterization of the Process Mechanical Cell at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Drake, John; Schneider, Ken; Choroser, Jeff; Hughes, Karl

    2003-01-01

    The West Valley Demonstration Project has initiated decontamination and dismantlement (D and D) of the most highly radioactive and contaminated cells in a former spent nuclear fuel reprocessing plant. The goals of the D and D project are to remove loose debris in the cells and estimate the residual radioactivity level of legacy plant equipment. To support accomplishment of these goals, a unique characterization approach was developed to gather the information to meet anticipated Waste Isolation Pilot Plant (WIPP) acceptance criteria for remote-handled transuranic waste, and to facilitate segregation and packaging operations. Implementation of the characterization approach included the development and use of innovative, remote technology for measuring gamma radiation within the hot cell. The technology was used to identify and quantify radiation from individual debris items in radiation fields up to 2,000 R/hr (20 sieverts/hr). Sampling and analysis of the debris were also performed via remote handling means. Significant challenges associated with characterizing the highly radioactive and highly contaminated hot cells were encountered. The innovative solutions for meeting these challenges are applicable throughout the Department of Energy Complex and help support the goal of targeting D and D efforts toward reducing risks to public health and the environment

  7. ARSENIC REMOVAL FROM DRINKING WATER BY PROCESS MODIFICATION TO COAGULATION/FILTRATION. USEPA DEMONSTRATION PROJECT AT LIDGERWOOD, ND. FINAL PERFORMANCE EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Lidgerwood, North Dakota site. The objectives of the project were to evaluate: (1) the effectiveness of process modifications to an e...

  8. The ESDRED project: Engineering studies and demonstration of repository designs

    International Nuclear Information System (INIS)

    Verstricht, J.

    2009-01-01

    The construction, operation and closure of a deep geological repository for spent fuel and long-lived radioactive waste in clay involves specific technologies. The demonstration of these techniques at an industrial scale is being carried out in the frame of a technological integrated project within the sixth Framework Programme of EURATOM. The Belgian design for high level waste disposal is based on the so-called Supercontainer concept. Within this concept, the waste is encased in a carbon steel overpack, which is consequently fitted into a 70 cm thick concrete shell, in its turn enveloped by a stainless steel liner. A Supercontainer measures about 2 m in diameter. In the design of the repository, the Supercontainers will be emplaced, one after the other, in disposal galleries. The space between the Supercontainers and the gallery lining needs to be filled up with a solid material. The most essential function of this component, referred to as backfill, is to prevent a collapse of the gallery. A secondary function is to limit the presence of free oxygen, to limit corrosion. In the ESDRED project EIG EURIDICE, together with SCK-CEN and ONDRAF/NIRAS, investigates technologies to apply the backfill. After testing two techniques to apply the backfill in 2007 at limited scale (unite with granular material and grouting with backfill mortar), grouting was selected as the preferred technique. This technique then should be tested at full-scale (30 m long mock-up). First, a full-scale structure needs to built, including an extensive instrumentation programme. In addition, the logistical needs to ensure a continuous backfill operation have to be worked out. The objective is to have the almost 100 m 3 backfilled in 4 hours

  9. Solar heating and cooling demonstration project at the Florida Solar Energy Center

    Energy Technology Data Exchange (ETDEWEB)

    Hankins, J.D.

    1980-02-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. Information is provided on the system's test, operation, controls, hardware and installation, including detailed drawings. The Center's office building, approximately 5000 square feet of space, with solar air conditioning and heating as a demonstration of the technical feasibility is located just north of Port Canaveral, Florida. The system was designed to supply approximately 70% of the annual cooling and 100% of the heating load. The project provides unique high-temperature, non-imaging, non-tracking, evacuated-tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection.

  10. Cryogenic Barrier Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  11. Idaho Nuclear Technology and Engineering Center Newly Generated Liquid Waste Demonstration Project Feasibility Study

    International Nuclear Information System (INIS)

    Herbst, A.K.

    2000-01-01

    A research, development, and demonstration project for the grouting of newly generated liquid waste (NGLW) at the Idaho Nuclear Technology and Engineering Center is considered feasible. NGLW is expected from process equipment waste, decontamination waste, analytical laboratory waste, fuel storage basin waste water, and high-level liquid waste evaporator condensate. The potential grouted waste would be classed as mixed low-level waste, stabilized and immobilized to meet RCRA LDR disposal in a grouting process in the CPP-604 facility, and then transported to the state

  12. Test plan for in situ bioremediation demonstration of the Savannah River Integrated Demonstration Project DOE/OTD TTP No.: SR 0566-01. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, T.C.

    1991-09-18

    This project is designed to demonstrate in situ bioremediation of groundwater and sediment contaminated with chlorinated solvents. Indigenous microorganisms will be simulated to degrade trichloroethylene (TCE), tetrachloroethylene (PCE) and their daughter products in situ by addition of nutrients to the contaminated zone. in situ biodegradation is a highly attractive technology for remediation because contaminants are destroyed, not simply moved to another location or immobilized, thus decreasing costs, risks, and time, while increasing efficiency and public and regulatory acceptability. Bioremediation has been found to be among the least costly technologies in applications where it will work.

  13. Public demonstration projects and field trials: Accelerating commercialisation of sustainable technology in solar photovoltaics

    International Nuclear Information System (INIS)

    Brown, James; Hendry, Chris

    2009-01-01

    The paper considers the role of government funded demonstration projects and field trials (DTs) in accelerating the commercialisation of new energy technologies that meet a public good but do not have immediate market appeal [Sagar, A.D., van der Zwaan, B., 2006. Technological innovation in the energy sector: R and D, deployment, and learning-by-doing. Energy Policy 34, 2601-2608]. Drawing on an original database of DTs in the EU, Japan and USA from 1973 to 2004, we review the history of DTs in photovoltaic technology for electricity generation, and its subsequent take up as a commercial energy source. We find that DTs that are aimed purely at discovering suitable market opportunities are less successful in achieving diffusion than projects that target a particular application and concentrate resources on it. The former nevertheless have a vital role to play in the learning process, while a targeted focus is often dependent on national industrial and institutional factors.

  14. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL AND ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT STEWART, MN. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project is to evaluate the effectiveness of Siemens¿ Type II AERALA...

  15. Minerals and energy: major development projects - April 2006 listing

    Energy Technology Data Exchange (ETDEWEB)

    William Mollard [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2006-06-15

    ABARE's project list, released around May and November each year, lists completed and committed projects in the minerals and energy sector in Australia. Santos' $200 million Casino gas field project in Bass Strait will produce natural gas and condensate while output from Berwyndale South will be coal seam methane. Five coal projects were completed in the six months to April 2006. The largest of these was Xstrata's Newlands Northern underground mine. In the same region, BMA's (BHP Billiton Mitsubishi Alliance) $102 million Broadmeadow underground mine and BHP/Mitsui Coal's $50 million Poitrel opencut mine, both near Moranbah, were brought into production. In New South Wales, two projects a new mine and a mine infrastructure development, both near Singletonwere commissioned. Xstrata's new Ravensworth West opencut mine will produce up to 1.5 million tonnes a year of thermal coal. Excel Coal's $73 million Wambo Rail project involved building a rail loop and loading facilities at its Wambo operation. Queensland coal mine projects and coal infrastructure developments account for 19 per cent (or $6.3 billion) of the estimated capital cost of $34 billion for all advanced projects. The largest coal mine development is the $1 billion Dawson mine expansion which is expected to add around 12 million tonnes of coking and thermal coal capacity, commencing in early 2007. Anglo Coal/Mitsui is also developing the large new Lake Lindsay opencut mine. Rio Tinto is developing its $440 million Clermont opencut mine. Twelve other advanced coal mine developments in Queensland are expected to raise coal production capacity by around 30 million tonnes a year by 2008. 10 figs., 4 tabs.

  16. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  17. Challenges in the delivery of nutrition services to hospital discharged older adults: the community connections demonstration project.

    Science.gov (United States)

    Sahyoun, Nadine R; Akobundu, Ucheoma; Coray, Kevin; Netterville, Linda

    2009-04-01

    The objective of this project was to explore the effort necessary to transform the Older Americans Act Nutrition Program (OAANP) into core programs within an integrated health care delivery system that serves hospital-discharged older adults in order to assist them in reintegrating into the community. Six OAANPs in six states were funded and provided technical assistance to develop coalitions with hospitals and community organizations. Each demonstration site was unique and faced many challenges in reaching out to a hospitalized vulnerable population. This project also provided opportunities to try out new initiatives and examine their sustainability within the community.

  18. Hydrogen for small-scale energy consumers and CO2-storage. Feasibility study of a demonstration project in the Rijnmond, Netherlands

    International Nuclear Information System (INIS)

    Bergsma, G.C.; Van der Werff, T.T.; Rooijers, F.J.

    1996-01-01

    In the future natural gas can be substituted by hydrogen. In the short term hydrogen can be produced from fossil fuels. Released CO 2 can be stored. In the long run it will be possible to produce hydrogen from renewable energy sources (solar cells and wind turbines), which can be transported to the consumer. In the study on the title subject attention is paid to different methods of hydrogen production from natural gas and from residual oils, costs and problems of hydrogen distribution, hydrogen appliances, and CO 2 storage. From the results it appears that a demonstration project to use hydrogen on a small-scale is feasible, although expensive. The costs of the reconstruction of the present natural gas distribution system to a hydrogen distribution system is higher than expected. The price of hydrogen per GJ is higher than the equal energy content of natural gas, in spite of a reduction of the energy levy. The demonstration project will be 25% cheaper per GJ hydrogen when carried out in a newly built area. A demonstration project in which hydrogen is mixed with natural gas is even a factor 2 cheaper. 17 refs., 7 appendices

  19. Decontamination of the extraction sample aisle at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.

    1986-09-01

    This report describes the decontamination and decommissioning (D and D) of the Extraction Sample Aisle (XSA) at the West Valley Demonstration Project. The XSA is one of several areas in the former reprocessing plant required for use in support of the solidification of high-level waste. The XSA contained three glove boxes which housed sample stations. It became radioactively contaminated during fuel reprocessing from 1966 to 1972. This report describes the work performed to accomplish the D and D objectives of removing existing piping and equipment and of reducing radiation and contamination levels, to As-Low-As-Reasonably-Achievable (ALARA) levels for the installation of new equipment. Also reported are pre- and post-radiological conditions, personnel exposure, radioactive waste volume collected, cost and schedule data, and lessons learned

  20. Low-Level Legacy Waste Processing Experience at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Valenti, P.J.; Rowell, L.E.; Kurasch, D.H.; Moore, H.R.

    2006-01-01

    This paper presents detailed results and lessons learned from the very challenging and highly successful 2005 low level radioactive waste sorting, packaging, and shipping campaign that removed over 95% of the available inventory of 350,000 ft 3 of legacy low level waste at the West Valley Demonstration Project near West Valley, New York. First some programmatic perspective and site history is provided to provide pertinent context for DOE's waste disposal mandates at the site. This is followed by a detailed description of the waste types, the storage locations, the containers, and the varied sorting and packaging facilities used to accomplish the campaign. The overall sorting and packaging protocols for this inventory of wastes are defined. This is followed by detailed sorting data and results concluding with lessons learned. (authors)

  1. GATEWAY Demonstrations: Exterior LED Lighting Projects at Princeton University

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Evans, WIlliam E. [Princeton Univ., NJ (United States); Murphy, Arthur [Princeton Univ., NJ (United States); Perrin, Tess [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-30

    This report focuses on four exterior solid-state lighting projects that have been completed at Princeton since 2008, when the University adopted a comprehensive sustainability plan. Through these initial projects – which include a parking garage, a pedestrian path, and two parking lot installations – the school’s facilities engineering staff learned important lessons about SSL technology and gained experience in dealing with the rapidly changing landscape of lighting manufacturers and their suppliers.

  2. China's precarious synthetic natural gas demonstration

    International Nuclear Information System (INIS)

    Yang, Chi-Jen

    2015-01-01

    In 2013, China's national government abandoned its previous cautious policy and started to promote large-scale deployment of coal-based synthetic natural gas (SNG). Coal-based SNG is both carbon-intensive and very water-intensive. Driven by a smog crisis and the recession of coal industry, China's 2013 policy change is major setback in its long-term efforts in carbon mitigation and water conservation. The government of China made the policy change before the commercial commencement of China's first SNG demonstration plant. Since the commencement of China's SNG demonstration plant, many problems have started to appear. In this article, I discuss the nature of demonstration project and explain the danger in starting a crash program without evaluating the demonstration comprehensively and transparently. - Highlights: • China is promoting large-scale commercialization of synthetic natural gas (SNG) plants. • The push for commercialization started before the startup of its first SNG demonstration. • A crash SNG program is both financially risky and environmental detrimental. • China should reconsider its SNG policy and adopt a more cautious approach

  3. Northwest Open Automated Demand Response Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

    2009-08-01

    Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was

  4. Arsenic Removal from Drinking Water by Absorptive Media-U.S. EPA Demonstration Project at Desert Sands MDWCA, NM Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Desert Sands Mutual Domestic Water Consumers Association (MDWCA) facility in Anthony, NM. The objectives of the project were to evalu...

  5. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Village of Waynesville, IL - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal drinking water treatment technology demonstration project at the Village of Waynesville, IL. The main objective of the project was to evaluate the effectiveness of the Peerless coagu...

  6. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Town of Arnaudville, LA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the United Water Systems’ facility in Arnaudville, LA. The objectives of the project were to evaluate: (1) the effectiveness of K...

  7. 77 FR 3847 - Major Capital Investment Projects

    Science.gov (United States)

    2012-01-25

    ... stating FTA should index or otherwise normalize the cost effectiveness thresholds to differentiate between... effectiveness, environmental benefits, and economic development benefits. a. Cost Effectiveness. All of the... identified by the statute; cost effectiveness is currently the only project justification criterion that...

  8. Coal ash artificial reef demonstration

    International Nuclear Information System (INIS)

    Livingston, R.J.; Brendel, G.F.; Bruzek, D.A.

    1991-01-01

    This experimental project evaluated the use of coal ash to construct artificial reefs. An artificial reef consisting of approximately 33 tons of cement-stabilized coal ash blocks was constructed in approximately 20 feet of water in the Gulf of Mexico approximately 9.3 miles west of Cedar Key, Florida. The project objectives were: (1) demonstrate that a durable coal ash/cement block can be manufactured by commercial block-making machines for use in artificial reefs, and (2) evaluate the possibility that a physically stable and environmentally acceptable coal ash/cement block reef can be constructed as a means of expanding recreational and commercial fisheries. The reef was constructed in February 1988 and biological surveys were made at monthly intervals from May 1988 to April 1989. The project provided information regarding: Development of an optimum design mix, block production and reef construction, chemical composition of block leachate, biological colonization of the reef, potential concentration of metals in the food web associated with the reef, acute bioassays (96-hour LC 50 ). The Cedar Key reef was found to be a habitat that was associated with a relatively rich assemblage of plants and animals. The reef did not appear to be a major source of heavy metals to species at various levels of biological organization. GAI Consultants, Inc (GAI) of Monroeville, Pennsylvania was the prime consultant for the project. The biological monitoring surveys and evaluations were performed by Environmental Planning and Analysis, Inc. of Tallahassee, Florida. The chemical analyses of biological organisms and bioassay elutriates were performed by Savannah Laboratories of Tallahassee, Florida. Florida Power Corporation of St. Petersburg, Florida sponsored the project and supplied ash from their Crystal River Energy Complex

  9. Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Muons, Inc.

    2011-05-24

    The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

  10. The International Polar Year in Portugal: A New National Polar Programme and a Major Education and Outreach project

    Science.gov (United States)

    Mendes-Victor, L.; Vieira, G.; Xavier, J.; Canario, A.

    2008-12-01

    Before the International Polar Year, in Portugal polar research was conducted by a very small group of scientists integrated in foreign projects or research institutions. Portugal was not member of the Scientific Committee for Antarctic Research (SCAR), the European Polar Board (EPB), neither a subscriber of the Antarctic Treaty. In 2004 Portuguese Polar researchers considered the IPY as an opportunity to change this situation and organized the national Committee for the IPY. The objectives were ambitious: to answer the aforementioned issues in defining and proposing a National Polar Programme. In late 2008, close to the end of the IPY, the objectives were attained, except the Antarctic Treaty signature that is, however, in an advanced stage, having been approved by consensus at the National Parliament in early 2007. Portugal joined SCAR in July 2006, the EPB in 2007 and a set of 5 Antarctic research projects forming the roots of the National Polar Programme (ProPolar) have been approved by the Foundation for Science and Technology (FCT-MCTES). Scientifically, the IPY can already be considered a major success in Portugal with an improvement in polar scientific research, in the number of scientists performing field work in the Antarctic, organizing polar science meetings and producing an expected increase in the number of polar science peer- reviewed papers. The Portuguese IPY scientific activities were accompanied by a major education and outreach project funded by the Agencia Ciência Viva (MCTES): LATITUDE60! Education for the Planet in the IPY. This project lead by the universities of Algarve, Lisbon and by the Portuguese Association of Geography Teachers is heavily interdisciplinary, programmed for all ages, from kindergarten to adults, and hoped to bring together scientists and society. LATITUDE60! was a major success and focussed on showing the importance of the polar regions for Earth's environment, emphasising on the implications of polar change for

  11. Decontamination of the Scrap Removal Room at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Bridenbaker, W.A.; Clemons, L.

    1987-02-01

    This report describes the decontamination and decommissioning (D and D) of the Scrap Removal Room (SRR) at the West Valley Demonstration Project (WVDP). The SRR is an area in the former reprocessing plant that is required for use in support of D and D for other plant areas. The SRR contained a 6.8 Mg (7.5-ton) crane for loading waste material into a shielded truck cask. It became radioactively contaminated during fuel reprocessing from 1966 to 1972. This report describes the work performed to accomplish the D and D objectives of removing existing piping and equipment and of reducing radiation and contamination levels, to As-Low-As-Reasonably-Achievable (ALARA) levels for the installation of new equipment. Also reported are pre- and post-radiological conditions, personnel exposure, radioactive waste volume collected, cost and schedule data, and lessons learned

  12. Advanced Biomass Gasification Projects

    Energy Technology Data Exchange (ETDEWEB)

    1997-08-01

    DOE has a major initiative under way to demonstrate two high-efficiency gasification systems for converting biomass into electricity. As this fact sheet explains, the Biomass Power Program is cost-sharing two scale-up projects with industry in Hawaii and Vermont that, if successful, will provide substantial market pull for U.S. biomass technologies, and provide a significant market edge over competing foreign technologies.

  13. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical

  14. Use of targeted medication reviews to deliver preconception care: A demonstration project.

    Science.gov (United States)

    DiPietro Mager, Natalie A; Bright, David R; Markus, Dani; Weis, Lindsey; Hartzell, David M; Gartner, James

    To demonstrate the ability of a statewide network of community pharmacists to provide preconception care services with the use of targeted medication reviews (TMRs). Community pharmacists are well qualified and well positioned to assist in this public health priority; however, there are no documented case studies of pharmacists providing preconception care with the use of TMRs. Through the demonstration project, pharmacists provided educational TMRs focused on 3 elements of preconception care to women aged 15 to 45 years enrolled in a nonprofit managed care plan: (1) medications that may cause fetal harm (category D/X); (2) folic acid use; and (3) immunizations. TMRs were generated and released to the individual pharmacy where that patient had prescriptions filled. Any practicing pharmacist in Ohio participating in the medication therapy management platform with a patient in the sample received a TMR notification. The pharmacists documented and billed for the service through this commercially available platform. Nineteen weeks after implementation of the TMRs, 1149 individual pharmacists from 818 different pharmacies had completed at least 1 TMR. Pharmacists completed 33% of all TMR opportunities with a 65% success rate. Establishing new services that were focused on preconception care resulted in rapid integration into existing medication therapy management processes in hundreds of pharmacies across Ohio. These results may help to provide justification for additional payers to reimburse for similar services. Through demonstrating the impact on preconception care, the role of the community pharmacist may continue to expand to include provision of additional preventive care services following the model developed in this initiative. Copyright © 2017 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.

  15. Solar energy parking canopy demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Cylwik, Joe [City of Big Bear Lake, Big Bear, CA (United States); David, Lawrence [City of Big Bear Lake, Big Bear, CA (United States)

    2015-09-24

    The goal of this pilot/demonstration program is to measure the viability of using solar photovoltaic (PV) technology at three locations in a mountain community environment given the harsh weather conditions. An additional goal is to reduce long-term operational costs, minimize green house gas emissions, lower the dependency on energy produced from fossil fuels, and improve the working environment and health of city employees and residents.

  16. Fiscal 1999 report on results of joint demonstrative project for environmentally benign coal utilization system. Demonstrative project concerning coal preparation technology (China); 1999 nendo kankyo chowagata sekitan riyo system kyodo jissho jigyo seika hokokusho. Sentan gijutsu ni kakawaru jissho jigyo (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the demonstrative project for coal preparation technology, as a part of the measures against environmental pollution due to the structuring of demonstration and dissemination basis for clean coal technologies in China, The results for fiscal 1999 is reported. In the utilization of coal in China, a problem of urgency is the highly efficient selection and removal of sulfur contents in raw coal. Coal production in Chongquing City is yearly 30 million tons, of which 90% contains sulfur contents of 3% or higher. At Jinjia Colliery of Panjiang Coal and Electric Co. Ltd., Guizhou Province, a site for the present project, a number of coal seams are unsuitable for single utilization because of high sulfur contents. The coal preparation technologies to be introduced are expected to improve coal preparation efficiency and desulfurization ratio in terms of both the washability of raw coal and the accuracy of the coal washer. This is the third year of the project, with the following activities performed, namely, research/design, manufacturing/procurement of equipment, design for construction work, training of operators or the like, and documentation. The manufacturing and procurement are for such equipment as vacuum disk filter with accessories, waste water thickener, pressure filter for tailings with accessories, flocculant pump/piping, slurry tank/pump, high-shear mixer with accessories, and electric instrumentation. All the equipment arrived at the site in January, 2001. (NEDO)

  17. 75 FR 59237 - TRICARE Co-Pay Waiver at Captain James A. Lovell Federal Health Care Center Demonstration Project

    Science.gov (United States)

    2010-09-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Co-Pay Waiver at Captain James A. Lovell.... ACTION: Notice of TRICARE Co-Pay waiver at Captain James A. Lovell Federal Health Care Center... ``TRICARE Co-Pay Waiver at Captain James A. Lovell Federal Health Care (FHCC) Demonstration Project.'' Under...

  18. The HADES demonstration and pilot project on radioactive waste disposal in a clay formation

    International Nuclear Information System (INIS)

    Bonne, A.; Beckers, H.; Beaufays, R.; Buyens, M.; Coursier, J.; Bruyn, D. de; Fonteyne, A.; Genicot, J.; Lamy, D.; Meynendonckx, P.; Monsecour, M.; Neerdael, B.; Noynaert, L.; Voet, M.; Volekaert, G.

    1992-01-01

    The overall objective of the HADES programme is the evaluation of the technical feasibility and safety of the disposal of radwaste in a deep clay formation. The pilot phase is aimed at demonstrating the system behaviour for those components of the system and those operations and issues which can be demonstrated directly. The time period considered covers a first phase of the development programme of the pilot project which includes: -The construction of a concrete lined tests drift of about 30 m length with a useful inner diameter of 3.5 m. In the lining, a number of openings or ports are foreseen for emplacing the various tests and sensors for the general auscultation in the host rock; - Mine-by test for the investigation of the response of the surrounding clay on the excavating; - CERBERUS test, a combined heating-irradiation test aiming at evaluating by simulation (electrical heaters and Co-60 radiation source) the impact of a HLW canister on its immediate near field; - Design of a gallery heating test for the demonstration by simulation of the behaviour of a concrete lined gallery structure and of the surrounding clay mass in a temperature field (TEMPPRES code for temperature and pressure evolution simulation). 21 refs

  19. Management Plan: Demonstration testing and evaluation of in situ soil heating

    International Nuclear Information System (INIS)

    Dev, H.

    1993-01-01

    In this project IITRI will demonstrate an in situ soil heating technology for the removal of hazardous organic contaminants present in the soil. In Situ heating will be accomplished by the application of 60 Hz AC power to the soil. The soil will be heated to a temperature of about 90 degree C. This technology is suited for the removal of those organic compounds which have a normal boiling point in the range of 100 degree to 210 degree C, or else for those which exhibit a pure component vapor pressure of at least 10 mm Hg in the 90 degree to 100 degree C temperature range. For example, perchloroethylene, dichlorobenzene, trichlorobenzene, etc. may be removed by in situ AC heating. It is planned to demonstrate the technology by heating approximately 400 tons of soil in the K-1070 Classified Burial Ground located at DOE's K-25 Site located in Oak Ridge, TN. It is estimated that the heating portion of the demonstration will take approximately 3 weeks at an average power input rate of 150 to 175 kill. IITRI expects to spend considerable time in the front end reviewing site characteristics, preparing detail design, developing Health and Safety Plans and other documents needed to obtain regulatory approval for the demonstration, arranging for site sampling, infrastructure development and document preparation. It is anticipated that site activities will begin in approximately 5 to 6 months. This contract was signed on September 30, 1993. IITRI started work on it in October 1993. It is planned to complete the demonstration and submit approved final reports by September 30, 1994. This project has 12 tasks and four major milestones. The major milestones and their planned completion dates are presented

  20. WBP/SIGAME the Brazilian BIG-GT demonstration project actual status and perspectives

    International Nuclear Information System (INIS)

    Carpentier, E.; Silva, A.

    1998-01-01

    Located in the tropics, with the sun shining all year round, and with its vast territory, Brazil may be regarded as having all the basic conditions to develop a modern Biomass for Electricity industry. Those characteristics together with: (a) the necessity of developing new energy resources for electricity production, in the northeast of the country; (b) the results of studies made by various entities, including CHESF; (c) the progress achieved by the BIG-GT technology; (d) the organisation of the Global Environment Facility (GEF); (e) and the support of the Brazilian government, through the Ministry of Science and Technology (MCT), provided the unique opportunity for the implementation of a commercial demonstration of that technology in Brazil. This paper describes the idea, scope, challenges, lessons, and actual status of development of the WBP/SIGAME project. It also highlights some institutional issues, budget figures, and energy prices. (author)

  1. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA - USEPA DEMONSTRATION PROJECT AT DESERT SANDS MDWCA, NM SIX MONTH EVALUATION

    Science.gov (United States)

    This report documents the activities performed during, and the results obtained from, the first six months of the arsenic removal treatment technology demonstration project at the Desert Sands Mutual Domestic Water Consumers Association (MDWCA) facility in Anthony, NM. The object...

  2. Electrodynamic Dust Shield Demonstrator

    Science.gov (United States)

    Stankie, Charles G.

    2013-01-01

    The objective of the project was to design and manufacture a device to demonstrate a new technology developed by NASA's Electrostatics and Surface Physics Laboratory. The technology itself is a system which uses magnetic principles to remove regolith dust from its surface. This project was to create an enclosure that will be used to demonstrate the effectiveness of the invention to The Office of the Chief Technologist. ONE of the most important challenges of space exploration is actually caused by something very small and seemingly insignificant. Dust in space, most notably on the moon and Mars, has caused many unforeseen issues. Dirt and dust on Earth, while a nuisance, can be easily cleaned and kept at bay. However, there is considerably less weathering and erosion in space. As a result, the microscopic particles are extremely rough and abrasive. They are also electrostatically charged, so they cling to everything they make contact with. This was first noted to be a major problem during the Apollo missions. Dust would stick to the spacesuits, and could not be wiped off as predicted. Dust was brought back into the spacecraft, and was even inhaled by astronauts. This is a major health hazard. Atmospheric storms and other events can also cause dust to coat surfaces of spacecraft. This can cause abrasive damage to the craft. The coating can also reduce the effectiveness of thermal insulation and solar panels.' A group of engineers at Kennedy Space Center's Electrostatics and Surface Physics Laboratory have developed a new technology, called the Electrodynamic Dust Shield, to help alleviate these problems. It is based off of the electric curtain concept developed at NASA in 1967. "The EDS is an active dust mitigation technology that uses traveling electric fields to transport electrostatically charged dust particles along surfaces. To generate the traveling electric fields, the EDS consists of a multilayer dielectric coating with an embedded thin electrode grid

  3. Biodiesel Mass Transit Demonstration

    Science.gov (United States)

    2010-04-01

    The Biodiesel Mass Transit Demonstration report is intended for mass transit decision makers and fleet managers considering biodiesel use. This is the final report for the demonstration project implemented by the National Biodiesel Board under a gran...

  4. Arsenic Removal from Drinking Water by Iron Removal and Adsorptive Media U.S. EPA Demonstration Project at Stewart, MN, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the one-year U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project was to evaluate the effectiveness ...

  5. Arsenic Removal from Drinking Water by Coagulation/Filtration, U.S. EPA Demonstration Project at the City of Okanogan, WA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the City of Okanogan, WA facility. The objectives of the project were to evaluate: (1) the effectiveness of Filtronics’ FH-13 Ele...

  6. Navy fuel cell demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Black, Billy D.; Akhil, Abbas Ali

    2008-08-01

    This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

  7. EBR-II spent fuel treatment demonstration project

    International Nuclear Information System (INIS)

    Benedict, R.W.; Henslee, S.P.

    1997-01-01

    For approximately 10 years, Argonne National Laboratory was developed a fast reactor fuel cycle based on dry processing. When the US fast reactor program was canceled in 1994, the fuel processing technology, called the electrometallurgical technique, was adapted for treating unstable spent nuclear fuel for disposal. While this technique, which involves electrorefining fuel in a molten salt bath, is being developed for several different fuel categories, its initial application is for sodium-bonded metallic spent fuel. In June 1996, the Department of Energy (DOE) approved a radiation demonstration program in which 100 spent driver assemblies and 25 spent blanket assemblies from the Experimental Breeder Reactor-II (EBR-II) will be treated over a three-year period. This demonstrated will provide data that address issues in the National Research Council's evaluation of the technology. The planned operations will neutralize the reactive component (elemental sodium) in the fuel and produce a low enriched uranium product, a ceramic waste and a metal waste. The fission products and transuranium elements, which accumulate in the electrorefining salt, will be stabilized in the glass-bonded ceramic waste form. The stainless steel cladding hulls, noble metal fission products, and insoluble residues from the process will be stabilized in a stainless steel/zirconium alloy. Upon completion of a successful demonstration and additional environmental evaluation, the current plans are to process the remainder of the DOE sodium bonded fuel

  8. Urban Options Solar Greenhouse Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  9. Clean Coal Technology Demonstration Program: Program Update 2001

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2002-07-30

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results. Also includes Power Plant Improvement Initiative Projects.

  10. Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design. Volume 18. Plant Section 2700 - Waste Water Treatment

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-05-01

    Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 18 which reports the design of Plant Section 2700 - Waste Water Treatment. The objective of the Waste Water Treatment system is to collect and treat all plant liquid effluent streams. The system is designed to permit recycle and reuse of the treated waste water. Plant Section 2700 is composed of primary, secondary, and tertiary waste water treatment methods plus an evaporation system which eliminates liquid discharge from the plant. The Waste Water Treatment Section is designed to produce 130 pounds per hour of sludge that is buried in a landfill on the plant site. The evaporated water is condensed and provides a portion of the make-up water to Plant Section 2400 - Cooling Water.

  11. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT VALLEY VISTA, AZ SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Arizona Water Company (AWC) facility in Sedona, AZ, commonly referred to as Valley Vista. The main objective of the...

  12. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project. Technical progress report No. 15, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.

  13. Highway for life demonstration project : LA 511 (70th Street). Research project capsule.

    Science.gov (United States)

    2013-06-01

    The Louisiana Department of Transportation and Development (LADOTD), : has been awarded a Highways for Life (HfL) grant to be used on the LA 511 : widening project in Caddo Parish. The LA 511 corridor is one of the busiest in the : Shreveport, Louisi...

  14. The Canadian Fusion Fuels Technology Project

    International Nuclear Information System (INIS)

    Dautovich, D.P.; Gierszewski, P.J.; Wong, K.Y.; Stasko, R.R.; Burnham, C.D.

    1987-04-01

    The Canadian Fusion Fuels Technology Project (CFFTP) is a national project whose aim is to develop capability in tritium and robotics technologies for application to international fusion development programs. Activities over the first five years have brought substantial interaction with the world's leading projects such as Tokamak Fusion Test Reactor (TFTR), the Joint European Torus (JET), and the Next European Torus (NET), Canadian R and D and engineering services, and hardware are in demand as these major projects prepare for tritium operation leading to the demonstration of energy breakeven around 1990. Global planning is underway for the next generation ignition experiment. It is anticipated this will provide increased opportunity for CFFTP and its contractors among industry, universities and governmental laboratories

  15. [Environmental licensing of major undertakings: possible connection between health and environment].

    Science.gov (United States)

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  16. Programme and activities on nuclear desalination in Morocco. Pre-project study on demonstration plant for seawater desalination using nuclear heating reactor in Morocco

    International Nuclear Information System (INIS)

    Righi, M.

    1998-01-01

    The first part of this paper gives the general information on the pre-project study of a demonstration plant for seawater desalination using a heating reactor being assessed jointly by Morocco and China. The progress of the pre-project study is elaborated in the second part. (author)

  17. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  18. Radiation protection system installation for the accelerator production of tritium/low energy demonstration accelerator project (APT/LEDA)

    CERN Document Server

    Wilmarth, J E; Tomei, T L

    2000-01-01

    The APT/LEDA personnel radiation protection system installation was accomplished using a flexible, modular proven system which satisfied regulatory orders, project design criteria, operational modes, and facility requirements. The goal of providing exclusion and safe access of personnel to areas where prompt radiation in the LEDA facility is produced was achieved with the installation of a DOE-approved Personnel Access Control System (PACS). To satisfy the facility configuration design, the PACS, a major component of the overall radiation safety system, conveniently provided five independent areas of personnel access control. Because of its flexibility and adaptability the Los-Alamos Neutron- Science-Center-(LANSCE)-designed Radiation Security System (RSS) was efficiently configured to provide the desired operational modes and satisfy the APT/LEDA project design criteria. The Backbone Beam Enable (BBE) system based on the LANSCE RSS provided the accelerator beam control functions with redundant, hardwired, ta...

  19. NDT performance demonstration in Spain

    International Nuclear Information System (INIS)

    Bollini, G.J.

    1994-01-01

    The experience obtained from the in-service inspection of reactor pressure vessels (RPV) of Spanish nuclear power plants and the participation in several international programs, such as PISC, has shown the need for a performance demonstration, not only for the ultrasonic inspection techniques of RPV, but also for other ISI non-destructive techniques as in the case of eddy current inspection of steam generator tubing. Section XI of the ASME Code, which is applied in Spain for ISI, has incorporated recently the Appendix VIII for performance demonstration of ultrasonic inspection techniques. As a direct consequence of this, a Spanish project for performance demonstration of ultrasonic inspection techniques has been launched recently, which includes the manufacturing of full-scale mock-ups of nozzle to vessel welds, reactor vessel welds, wrought austenitic piping welds and ferritic piping welds of PWR and BWR nuclear power plants from different suppliers. This considerable technical effort will let the different Spanish organizations which are part of the project to participate and colaborate with similar international projects and in particular with a European initiative for performance demonstration. (Author)

  20. Demonstration of hydrogen society in Nakskov. Final report; Denmark; Demonstratorium - Brintsamfundet i Nakskov. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Bech-Madsen, J. (IRD Fuel Cell Technology, Svendborg (DK)); Krogh Jensen, J. (Baltic Sea Solutions, Bass, Holeby (DK))

    2008-02-15

    This report summarizes results from the 'Demonstration of hydrogen in Nakskov' project. The project has established a demonstration of the Hydrogen Community in Nakskov. The demonstration facility is located at the entrance to Nakskov Genbrugsplads which has a lot of visitors. At this location information boards help visitors get acquainted with the technology and the function of the plant. It is likely that the majority of the citizens of West Lolland has visited the demonstration plant. The demonstration plant includes the following elements: 1) Container buildings for control and monitoring as well as housing of the process equipment. The containers are fully equipped with electricity, water and water treatment systems, drains, ventilation, cooling and heating systems and extensive safety systems. 2) Two fully automated PEM-CHP fuel cell units of 2 kW and 7.5 kW. 3) Two PEM-electrolysers for hydrogen and oxygen production for use in fuel cells and stimulation of aerobe processes in a waste water treatment system. 4) Low pressure storage steel tanks for oxygen and hydrogen. 5) Gas distribution grid for transporting oxygen and hydrogen from the electrolysers to the storage tanks and back to the fuel cells. 6) Official Authority approvals of the total demonstration facility comprising municipal building permission. Approval of zone classification and storage of hydrogen and oxygen, by the Lolland fire chief, February 1. 2007. Environmental evaluation and Environmental Impact assesment screening of the project performed by the regional county (Storstroms Amt), November 13. 2006. Project approval of hydrogen production and fuel cell plant by the Danish Safety Technology Authority, May 2. 2007. (au)

  1. Elder mediation in theory and practice: study results from a national caregiver mediation demonstration project.

    Science.gov (United States)

    Crampton, Alexandra

    2013-01-01

    Mediation is a process through which a third party facilitates discussion among disputing parties to help them identify interests and ideally reach an amicable solution. Elder mediation is a growing subspecialty to address conflicts involving older adults, primarily involving caregiving or finances. Mediation is theorized to empower participants but critics argue that it can exacerbate power imbalances among parties and coerce consensus. These contested claims are examined through study of a national caregiver mediation demonstration project. Study implications underscore the importance of gerontological social work expertise to ensure the empowerment of vulnerable older adults in mediation sessions.

  2. Drilling for improvement : Statoil and Halliburton report significant cost savings and more accurate well placement at the Leismer demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2010-07-15

    This article discussed new improvements in steam assisted gravity drainage (SAGD) made by Statoil and Halliburton at the Leismer demonstration project. The Leismer project is Statoil's inaugural project in oil sands development, and will have a capacity to produce 10,000 barrels per day through 4 separate well pads with 23 well pairs. Challenges to the project included the long lateral sections required for the well pairs to remain parallel to each other while remaining within the target formation. An azimuthal deep resistivity (ADR) tool was used to detect the proximity of the wellbore to shale and water zones. Use of the tool allowed operators to modify the planned well trajectory in order to optimize placements within the reservoir. A rotary steerable system (RSS) was used increase injection times. The project was completed 6 to 8 weeks ahead of schedule. Applications have now been filed for a further 10 phases that will produce 240,000 barrels per day. 1 fig.

  3. Demonstration project in Volgograd on transfer of know-how from the district heating sector in Denmark to Russia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    A demonstration project on district heating know-how has been financed by the Danish Technical Assistance Programme administrated by the Danish Energy Agency. A demonstration project in Volgograd was approved, with a budget of only 200.000 DKK (180.000 Rbl). The administration of the project, from fact finding to the final report, has been very efficient in particular to other technical assistance programmes. Although the total budget is low only around 15% of the manpower has been used on administration. The transfer of specific technical experience can be summarized in the following: Installation of small decentralized heat exchanger units for preparation of hot water; Construction of low-cost decentralized heat exchanger installations for preparation of hot water; Installation of thermostatic valves; Installation of small substations for heating and hot water; Use of drain pumps for draining under constructions of district heating pipes to prevent outside corrosion; Design principles for construction and rehabilitation of concrete duct systems with internal and outside draining; Design principles for preinsulated pipes; Principles for monitoring the quality of supply in a local district heating network at the lowest costs by monitoring the critical differential pressure. (EG)

  4. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Richmond Elementary School in Susanville, CA Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Richmond Elementary School in Susanville, CA. The objectives of the project were to evaluate: (1) the effectiveness of an Aquatic Treatme...

  5. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Woodstock Middle School in Woodstock, CT - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Woodstock Middle School in Woodstock, CT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™ me...

  6. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Geneseo Hills Subdivision, in Geneseo, IL Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Geneseo Hills Subdivision in Geneseo, IL. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies...

  7. Operating experience during high-level waste vitrification at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Valenti, P.J.; Elliott, D.I.

    1999-01-01

    This report provides a summary of operational experiences, component and system performance, and lessons learned associated with the operation of the Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP). The VF was designed to convert stored high-level radioactive waste (HLW) into a stable waste form (borosilicate glass) suitable for disposal in a federal repository. Following successful completion on nonradioactive test, HLW processing began in July 1995. Completion of Phase 1 of HLW processing was reached on 10 June 1998 and represented the processing of 9.32 million curies of cesium-137 (Cs-137) and strontium-90 (Sr-90) to fill 211 canisters with over 436,000 kilograms of glass. With approximately 85% of the total estimated curie content removed from underground waste storage tanks during Phase 1, subsequent operations will focus on removal of tank heel wastes

  8. Soil Remediation Demonstration Project: Biodegradation of Heavy Fuel Oils

    National Research Council Canada - National Science Library

    Reynolds, Charles

    1997-01-01

    .... Low-cost treatments applicable to small-scale spills are needed. The object of this CPAR project was to examine using cost-effective, on-site bioremediation techniques for heavy-oil-contaminated soil in cold regions...

  9. Clean Coal Technology Demonstration Program: Program Update 1998

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    1999-03-01

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  10. The health protection of riparian populations in case of a major oil spill:. The St. Lawrence Vision 2000 Shores project

    International Nuclear Information System (INIS)

    Guerrier, P.; Tardif, G.

    1995-01-01

    Objectives of a research project to protect the health of riparian populations in the event of a major oil spill in the St. Lawrence river were summarized. The project is a part of the health component of the St. Lawrence Vision 2000 (SLV-2000) action plan, which is a product of co-operation among Environment Canada, Health Canada, le ministere de la Sante et des Services sociaux du Quebec, and other government departments, designed to protect and conserve the St. Lawrence river and its environment

  11. Projection of future runoff change using climate elasticity method derived from Budyko framework in major basins across China

    Science.gov (United States)

    Xing, Wanqiu; Wang, Weiguang; Zou, Shan; Deng, Chao

    2018-03-01

    This study established a climate elasticity method based on Budyko hypothesis and enhanced it by selecting the most effective Budyko-type formula to strengthen the runoff change prediction reliability. The spatiotemporal variations in hydrologic variables (i.e., runoff, precipitation and potential evaporation) during historical period were revealed first and the climate elasticities of runoff were investigated. The proposed climate elasticity method was also applied to project the spatiotemporal variations in future runoff and its key influencing factors in 35 watersheds across China. Wherein, the future climate series were retrieved by consulting the historical series, informed by four global climate models (GCMs) under representative concentration pathways from phase five of the Coupled Model Intercomparison Project. Wang-Tang equation was selected as the optimal Budyko-type equation for its best ability in reproducing the runoff change (with a coefficient of determination and mean absolute error of 0.998 and 1.36 mm, respectively). Observed runoff presents significant decreasing trends in the northern and increasing trends in the southern regions of China, and generally its change is identified to be more sensitive to climatic variables in Hai River Basin and lower Yellow River Basin. Compared to the runoff during the reference period, positive change rates in the north and negative change rates in the south of China in the mid-21st century can be practically generalized from the majority of GCMs projections. This maybe resulted from the increasing precipitation, especially in parts of northern basins. Meanwhile, GCMs project a consistently upward trend in potential evaporation although significant decreasing trends occur in the majority of catchments for the historical period. The results indicate that climate change will possibly bring some changes to the water resources over China in the mid-21st century and some countermeasures of water resources planning

  12. Model Projections of Future Fluvial Sediment Delivery to Major Deltas Under Environmental Change

    Science.gov (United States)

    Darby, S. E.; Dunn, F.; Nicholls, R. J.; Cohen, S.; Zarfl, C.

    2017-12-01

    Deltas are important hot spots for climate change impacts on which over half a billion people live worldwide. Most of the world's deltas are sinking as a result of natural and anthropogenic subsidence and due to eustatic sea level rise. The ability to predict rates of delta aggradation is therefore critical to assessments of the extent to which sedimentation can potentially offset sea level rise, but our ability to make such predictions is severely hindered by a lack of insight into future trends of the fluvial sediment load supplied to their deltas by feeder watersheds. To address this gap we investigate fluvial sediment fluxes under future environmental change for a selection (47) of the world's major river deltas. Specifically, we employed the numerical model WBMsed to project future variations in mean annual fluvial sediment loads under a range of environmental change scenarios that account for changes in climate, socio-economics and dam construction. Our projections indicate a clear decrease (by 34 to 41% on average, depending on the specific scenario) in future fluvial sediment supply to most of the 47 deltas. These reductions in sediment delivery are driven primarily by anthropogenic disturbances, with reservoir construction being the most influential factor globally. Our results indicate the importance of developing new management strategies for reservoir construction and operation.

  13. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Seely-Brown Village in Pomfret, CT - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at Seely-Brown Village in Pomfret, CT. The objectives of the project were to evaluate the effectiveness of ArsenXnp adsorption media in...

  14. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  15. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001; Forschung, Entwicklung und Demonstration im Bereich der Energie in der Schweiz. Liste der Projekte 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report.

  16. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT BRUNI, TX, SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) site at Bruni, TX. The main objective of the projec...

  17. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT DUMMERSTON, VT SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months (from June 22, 2005 through December 22, 2005) of the arsenic removal treatment technology demonstration project at Charette Mobile Home Park (CMHP) in Dummerston, Vermont. T...

  18. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT BOW, NH , SIX MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the White Rock Water Company (WRWC) public water system, a small residential drinking water facility in Bo...

  19. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  20. Parents as Teachers Health Literacy Demonstration project: integrating an empowerment model of health literacy promotion into home-based parent education.

    Science.gov (United States)

    Carroll, Lauren N; Smith, Sandra A; Thomson, Nicole R

    2015-03-01

    The Parents as Teachers (PAT) Health Literacy Demonstration project assessed the impact of integrating data-driven reflective practices into the PAT home visitation model to promote maternal health literacy. PAT is a federally approved Maternal, Infant, Early Childhood Home Visiting program with the goal of promoting school readiness and healthy child development. This 2-year demonstration project used an open-cohort longitudinal design to promote parents' interactive and reflective skills, enhance health education, and provide direct assistance to personalize and act on information by integrating an empowerment paradigm into PAT's parent education model. Eight parent educators used the Life Skills Progression instrument to tailor the intervention to each of 103 parent-child dyads. Repeated-measures analysis of variance, paired t tests, and logistic regression combined with qualitative data demonstrated that mothers achieved overall significant improvements in health literacy, and that home visitors are important catalysts for these improvements. These findings support the use of an empowerment model of health education, skill building, and direct information support to enable parents to better manage personal and child health and health care. © 2014 Society for Public Health Education.

  1. Design, construction, and operation of the contact size reduction facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Frank, D.E.; Reeves, S.R.; Valenti, P.J.

    1988-05-01

    This paper describes the design, construction and initial operation of the Contact-Handled Size Reduction Facility (CSRF) at the West Valley Demonstration Project. The facility was constructed to size reduce contaminated tanks, piping, and other metallic scrap and package the scrap for disposal. In addition, the CSRF has the capability to decontaminate scrap prior to disposal. The anticipated result of decontaminating the scrap is to reduce waste classified as transuranic or low-level Class B and C to Class A or release for unrestricted use as nonradioactive equipment. 10 figs., 1 tab

  2. The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

    2013-09-30

    This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

  3. Preliminary design report: Prototypical Spent Fuel Consolidation Equipment Demonstration Project: Phase 1

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Mitchell, J.L.; Winkler, C.J.

    1986-12-01

    This document describes the Westinghouse Preliminary Design for the Prototypical Consolidation Demonstration Project per Department of Energy (DOE) Contract No. DE-AC07-86ID12649 and under direction of the DOE Idaho Operations Office. The preliminary design is the first step to providing the Department of Energy with a fully qualified, licensable, cost-effective spent fuel rod consolidation system. The design was developed using proven technologies and equipment to create an innovative approach to previous rod consolidation concepts. These innovations will better enable the Westinghouse system to: consolidate fuel rods in a precise, fully-controlled, accountable manner; package all rods from two PWR fuel assemblies or from four BWR fuel assemblies in one 8.5 inch square consolidated rods canister; meet all functional requirements; operate with all fuel types common to the US commercial nuclear industry with minimal tooling changeouts; and meet consolidation production process rates, while maintaining operator and public health and safety. This Preliminary Design Report provides both detailed descriptions of the equipment required to perform the rod consolidation process and the supporting analyses to validate the design

  4. Benchmarking the Remote-Handled Waste Facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Mendiratta, O.P.; Ploetz, D.K.

    2000-01-01

    ABSTRACT Facility decontamination activities at the West Valley Demonstration Project (WVDP), the site of a former commercial nuclear spent fuel reprocessing facility near Buffalo, New York, have resulted in the removal of radioactive waste. Due to high dose and/or high contamination levels of this waste, it needs to be handled remotely for processing and repackaging into transport/disposal-ready containers. An initial conceptual design for a Remote-Handled Waste Facility (RHWF), completed in June 1998, was estimated to cost $55 million and take 11 years to process the waste. Benchmarking the RHWF with other facilities around the world, completed in November 1998, identified unique facility design features and innovative waste processing methods. Incorporation of the benchmarking effort has led to a smaller yet fully functional, $31 million facility. To distinguish it from the June 1998 version, the revised design is called the Rescoped Remote-Handled Waste Facility (RRHWF) in this topical report. The conceptual design for the RRHWF was completed in June 1999. A design-build contract was approved by the Department of Energy in September 1999

  5. Benchmarking the Remote-Handled Waste Facility at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    O. P. Mendiratta; D. K. Ploetz

    2000-02-29

    ABSTRACT Facility decontamination activities at the West Valley Demonstration Project (WVDP), the site of a former commercial nuclear spent fuel reprocessing facility near Buffalo, New York, have resulted in the removal of radioactive waste. Due to high dose and/or high contamination levels of this waste, it needs to be handled remotely for processing and repackaging into transport/disposal-ready containers. An initial conceptual design for a Remote-Handled Waste Facility (RHWF), completed in June 1998, was estimated to cost $55 million and take 11 years to process the waste. Benchmarking the RHWF with other facilities around the world, completed in November 1998, identified unique facility design features and innovative waste pro-cessing methods. Incorporation of the benchmarking effort has led to a smaller yet fully functional, $31 million facility. To distinguish it from the June 1998 version, the revised design is called the Rescoped Remote-Handled Waste Facility (RRHWF) in this topical report. The conceptual design for the RRHWF was completed in June 1999. A design-build contract was approved by the Department of Energy in September 1999.

  6. Latest feedback from a major reactor vessel dismantling project

    International Nuclear Information System (INIS)

    Boucau, J.; Segerud, P.; Sanchez, M.; Garcia, R.

    2015-01-01

    Westinghouse performed two large segmentation projects in 2010-2013 and then 2013-2015 at the Jose Cabrera nuclear power plant in Spain. The power plant is located in Almonacid de Zorita, 43 miles east of Madrid, Spain and was in operation between 1968 and 2006. This paper will describe the sequential steps required to prepare, segment, separate, and package the individual component segments using under water mechanical techniques. The paper will also include experiences and lessons learned that Westinghouse has collected from the activities performed during the reactor vessel and vessel internals segmentation projects. (authors)

  7. Shippingport: A relevant decommissioning project

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    Because of Shippingport's low electrical power rating (72 MWe), there has been some misunderstanding on the relevancy of the Shippingport Station Decommissioning Project (SSDP) to a modern 1175 MWe commercial pressurized water reactor (PWR) power station. This paper provides a comparison of the major components of the reactor plant of the 72 MWe Shippingport Atomic Power Station and an 1175 MWe nuclear plant and the relevancy of the Shippingport decommissioning as a demonstration project for the nuclear industry. For the purpose of this comparison, Portland General Electric Company's 1175 MWe Trojan Nuclear Plant at Rainier, Oregon, has been used as the reference nuclear power plant. 2 refs., 2 figs., 1 tab

  8. An aerial radiological survey of the West Valley Demonstration Project and surrounding area, West Valley, New York

    International Nuclear Information System (INIS)

    Berry, H.A.

    1991-09-01

    An aerial radiological survey of the West Valley Demonstration Project and the surrounding area was conducted from mid-August through early September 1984 by EG ampersand G Energy Measurements, Inc. for the United States Department of Energy. The radiological survey was part of the United States Department of Energy Comprehensive Integrated Remote Sensing (CIRS) program, which provides state-of-the-art remote sensing to support the needs of the various DOE facilities. The survey consisted of airborne measurements of both natural and man-made gamma radiation emanating from the terrestrial surface. These measurements allowed an estimate of the distribution of isotopic concentrations in the area surrounding the project site. Results are reported as isopleths superimposed on aerial photographs of the area. Gamma ray energy spectra are also presented for the net man-made radionuclides. 8 refs., 16 figs., 9 tabs

  9. SmartPark Technology Demonstration Project, Phase II: Final Report

    Science.gov (United States)

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  10. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  11. Arsenic Removal from Drinking Water by Iron Removal U.S. EPA Demonstration Project at Sabin, MN Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from January 30, 2006 to April 29, 2007 at the U.S. Environmental Protection Agency (EPA) Arsenic Removal Technology Demonstration site in Sabin, MN. The main objective of the project was to evaluate the eff...

  12. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  13. Photo Z: A Real Research Project for Undergraduate Non-Majors

    Science.gov (United States)

    Rector, Travis A.; Puckett, A. W.; Hinnah, K. D.

    2009-01-01

    Research-Based Science Education (RBSE) is a method of instruction that models the processes of scientific inquiry and exploration used by scientists to discover new knowledge. It is "research-based" in the sense that students work together on a real astronomical research project. In other words, in order to learn science, students are given the opportunity to actually do science. We present "Photo Z," a new RBSE project wherein students search for distant galaxies using data from the NOAO Deep Wide Field Survey (NDWFS). Students download FITS data files from the NDWFS cutout server. They then complete photometry of galaxies in three bands (Bw, V and I) using Polaris, a custom-made plugin written for ImageJ. The photometric color of each galaxy allows an estimate of its redshift as well as its star-formation history. Many student projects are possible. An example is to search for galaxies clustered around high-redshift quasars. An advantage of this project is that the datasets are readily available online. This project is part of an NSF CCLI grant to develop and test RBSE curricula in an undergraduate course setting. The goals of RBSE are fourfold: (1) To teach that science is a process, not just a body of knowledge; (2) To improve retention of science content by using it in a research project; (3) to improve attitudes towards STEM careers, particularly among first-year students; and (4) to develop task-driven skills, such as critical thinking and teamwork skills, that are useful in any career path. These curricula are currently being developed and tested at the University of Alaska Anchorage, Indiana University Bloomington, and Pima Community College.

  14. Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project

    International Nuclear Information System (INIS)

    Gong, Chung; Pelfrey, J.R.

    1993-01-01

    The Bentonite Mat Demonstration Project (BMDP) is a field demonstration study to determine the construction/installation requirements, permeability, and subsidence performance characteristics of a composite barrier. The composite barrier will consist of on-site sandy-clay blanketed by a bentonite mat and a flexible High Density Polyethylene (HDPE) liner (also called flexible membrane liner). Construction of one control test pad and three bentonite test pads are planned. The control test pad will be used to establish baseline data. Underneath the composite clay cap is a four feet thick loose sand layer in which cavities will be created by evacuation of sand. The present work provides a mathematical model for the BMDP. The mathematical model will be used to simulate the mechanical and structural responses of the composite clay cap during the testing processes. Based upon engineering experience and technical references, a set of nominal soil parameters have been selected

  15. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Northeastern Elementary School in Fountain City, IN - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Northeastern Elementary School in Fountain City, IN. The main objective of the project was to evaluate the effectiveness of US Water Sys...

  16. Overview about the fuel cell bus demonstration programs CUTE, ECTOS and STEP

    International Nuclear Information System (INIS)

    Faltenbacher, M.; Fischer, M.; Eyerer, P.; Binder, M.; Schuckert, M.

    2004-01-01

    'Full text:' The paper will give an overview about the CUTE, ECTOS and STEP projects. The aim of the projects is to develop and demonstrate a emission-free and low-noise transport system, including the accompanying energy infrastructure, which has great potential for reducing the global greenhouse effect according to the Kyoto protocol, improving the quality of the atmosphere and life in densely populated areas and conserving fossil resources. For this purpose the application of the innovative hydrogen-based fuel cell technology is established by using fuel cell powered buses in an urban environment together with novel hydrogen production and support systems as part of a European Union wide demonstration scheme. The project demonstrates also to European Society the availability of the FC technology as a safe and reliable transportation technology. The major objectives are as follows: Demonstration of more than 20 fuel cell powered regular service buses over a period of two years in several European inner city areas to illustrate the different operating conditions to be found in Europe; Design, construction and operation of the necessary infrastructure for hydrogen production, including the required refuelling stations; Collection of findings concerning the construction and operating behaviour of hydrogen production for mobile use, and exchange of experiences including bus operation under differing conditions among the numerous participating companies; and, the research work of IKP and PE comprises the ecological analysis of the entire life cycle and comparison with conventional alternatives (diesel driven buses, CNG-buses). It also includes the economical analysis of the hydrogen infrastructure. First experiences from CUTE and ECTOS were presented. (author)

  17. Recovery Act - Demonstration of Sodium Ion Battery for Grid Level Applications

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, Ted [Aquion Energy, Inc., Pittsburgh, PA (United States); Whitacre, Jay [Aquion Energy, Inc., Pittsburgh, PA (United States); Weber, Eric [Aquion Energy, Inc., Pittsburgh, PA (United States); Eshoo, Michael [Aquion Energy, Inc., Pittsburgh, PA (United States); Noland, James [Aquion Energy, Inc., Pittsburgh, PA (United States); Blackwood, David [Aquion Energy, Inc., Pittsburgh, PA (United States); Campbell, Williams [Aquion Energy, Inc., Pittsburgh, PA (United States); Sheen, Eric [Aquion Energy, Inc., Pittsburgh, PA (United States); Spears, Christopher [Aquion Energy, Inc., Pittsburgh, PA (United States); Smith, Christopher [Aquion Energy, Inc., Pittsburgh, PA (United States)

    2012-08-31

    Aquion Energy received a $5.179 million cooperative research agreement under the Department of Energy's Smart Grid Demonstration Program Demonstration of Promising Energy Storage Technologies (Program Area 2.5) of FOA DE-FOE-0000036. The main objective of this project was to demonstrate Aquion's low cost, grid-scale, ambient temperature sodium ion energy storage device. The centerpiece of the technology is a novel hybrid energy storage chemistry that has been proven in a laboratory environment. The objective was to translate these groundbreaking results from the small-batch, small-cell test environment to the pilot scale to enable significant numbers of multiple ampere-hour cells to be manufactured and assembled into test batteries. Aquion developed a proof of concept demonstration unit that showed similar performance and major cost improvement over existing technologies. Beyond minimizing cell and system cost, Aquion built a technology that is safe, environmentally benign and durable over many thousands of cycles as used in a variety of grid support roles.

  18. Demonstration test of in-service inspection methods

    International Nuclear Information System (INIS)

    Takumi, Kenji

    1987-01-01

    The major objectives of the project are: (1) to demonstrate the reliability of a manual ultrasonic flaw detector and techniques that are used in operating light water reactor plants and (2) to demonstrate the performance and reliability of an automatic ultrasonic flaw detector that is designed to shorten the time required for ISI work and reduce the exposure risk of inspection personnel. The test project consists of three stages. In the first stage, which ended in 1982, defects were added intentionally to a model structure the same in size as a typical 1.1 million kW BWR plant and manual ultrasonic flaw detection tensting was performed. In the second stage, completed in 1984, automatic eddy-current flaw detection testing was carried out for defects in heat transfer piping of a PWP steam generator. In the third stage, which started in 1981 and ended in March 1987, a newly developed automatic ultrasonic flaw detector is applied to testing of defects used for the manual detector performance evaluation. Results have shown that the automatic eddy-current flaw detector under test has an adequately stable performance for practical uses, with a very high reproducibility to permit close inspection of secular deterioration in heat transfer pipes. It has also revealed that both the manual and automatic ultrasonic flaw detectors under test can detect all defects that do not comply with the ASME standards. (Nogami, K.)

  19. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001; Forschung, Entwicklung und Demonstration im Bereich der Energie in der Schweiz. Liste der Projekte 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report.

  20. Using Travel Diary Data to Estimate the Emissions Impacts of Transportation Strategies: The Puget Sound Telecommuting Demonstration Project

    OpenAIRE

    Henderson, Dennis K.; Koenig, Brett E.; Mokhtarian, Patricia L.

    1996-01-01

    Transportation control measures are often implemented for their environmental benefits, but there is a need to quantify what benefits actually occur. Telecommuting has the potential to reduce the number of daily trips and miles traveled with personal vehicles and, consequently, the overall emissions resulting from vehicle activity. This search studies the emissions impacts of telecommuting for the participants of the Puget Sound Telecommuting Demonstration Project (PSTDP). The California Air ...