WorldWideScience

Sample records for maintenance strategies based

  1. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  2. A basic condition-based maintenance strategy for air-cooled turbine generators

    International Nuclear Information System (INIS)

    Laird, T.; Griffith, G.; Hoof, M.

    2005-01-01

    This paper discusses the methods of using condition-based maintenance (CBM) for turbine generators. Even though it is focused on the maintenance strategy for air-cooled generators, all types of power producers can realize benefits from a better maintenance strategy at lower costs. A reliable assessment of the actual unit condition requires detailed knowledge of the unit design, operational weaknesses, cost of maintenance and operational capabilities. (author)

  3. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  4. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  5. Analyzing maintenance strategies by agent-based simulations: A feasibility study

    International Nuclear Information System (INIS)

    Kaegi, M.; Mock, R.; Kroeger, W.

    2009-01-01

    Thoroughly planned and implemented maintenance strategies save time and cost. However, the integration of maintenance work into reliability analysis is difficult as common modeling techniques are often not applicable due to state explosion which calls for restrictive model assumptions and oversimplification. From authors' point of view, agent-based modeling (ABM) of technical and organizational systems is a promising approach to overcome such problems. But since ABM is not well established in reliability analysis its feasibility in this area still has to be demonstrated. For this purpose ABM is compared with Markov chains, namely by analyzing the reliability of a maintained n-unit system with dependent repair events, applying both modeling approaches. Although ABM and Markov chains lead to the same numerical results, the former points out the potentiality of an improved system state handling. This is demonstrated by extending the ABM with operators as additional 'agents' featuring their location (x;y) availability (0;1) and different maintenance strategies. This extension highlights the capability of ABM to analyze complex emergent system behavior and allows a systematic refinement and optimization of the maintenance strategies.

  6. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  7. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  8. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  9. Geometric Process-Based Maintenance and Optimization Strategy for the Energy Storage Batteries

    Directory of Open Access Journals (Sweden)

    Yan Li

    2016-01-01

    Full Text Available Renewable energy is critical for improving energy structure and reducing environment pollution. But its strong fluctuation and randomness have a serious effect on the stability of the microgrid without the coordination of the energy storage batteries. The main factors that influence the development of the energy storage system are the lack of valid operation and maintenance management as well as the cost control. By analyzing the typical characteristics of the energy storage batteries in their life cycle, the geometric process-based model including the deteriorating system and the improving system is firstly built for describing the operation process, the preventive maintenance process, and the corrective maintenance process. In addition, this paper proposes an optimized management strategy, which aims to minimize the long-run average cost of the energy storage batteries by defining the time interval of the detection and preventive maintenance process as well as the optimal corrective maintenance times, subjected to the state of health and the reliability conditions. The simulation is taken under the built model by applying the proposed energy storage batteries’ optimized management strategy, which verifies the effectiveness and applicability of the management strategy, denoting its obvious practicality on the current application.

  10. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  11. Maintenance strategy based on reliability functions for an oil centrifugal pump

    Directory of Open Access Journals (Sweden)

    Denis Carlos Mengue

    2013-06-01

    Full Text Available The purpose of this article was to define the most appropriate maintenance strategy for a centrifugal pump (preventive, predictive, corrective or emergency, based on reliability calculation. The research method was the quantitative modeling, applied in a petroleum plant. The study may contribute to the development of a strategic model for the management of the industrial plant maintenance. In the company's information system, records of eleven years have been gathered on times between failures and times for repair of the equipment. These times were modeled by probability distributions. From the results obtained were calculated Reliability and Maintainability functions R(t and M(t. By combining their expected values (MTBF and MTTR, Av availability was calculated. The figures for MTBF, MTTR and Av were respectively 3,936 hours, 133 hours and 96.73%. The most likely shape factor of the Weibull distribution which modeled the time between failures was 0.69. So, it was possible to affirm that the pump is in the infant mortality phase. The theoretical framework of RCM indicated corrective  maintenance as the strategy for the item. This strategy aims to eliminate the defects of equipment design, reinforce items that usually break and remove the causes of the failures.

  12. A cost effective degradation-based maintenance strategy under imperfect repair

    International Nuclear Information System (INIS)

    Wu, Fan; Niknam, Seyed A.; Kobza, John E.

    2015-01-01

    An optimization model is developed to minimize the total cost of imperfect degradation-based maintenance by determining an optimal interval of condition monitoring and the degradation level after imperfect preventive repairs. The decision model is based on a novel cost model that considers functional relationship between the expected degradation reduction and the cost of preventive repairs. The decision model is applied to simulated vibration signals with a variety of specifications of cost values and degradation model parameters. This study has initiated a new area for the research of cost effective maintenance strategies. The results clearly indicate the significance of the proposed model and the decision variables under the objective of minimal cost. For instance, the results indicate direct relationship between the optimal length of monitoring interval and the monitoring cost. However, longer monitoring interval increases the risk of failure, and therefore, more degradation reduction is needed. By increasing the slope of cumulative degradation, the cost effective strategy advocates taking more frequent monitoring. The optimal degradation level after each preventive repair is not so sensitive to the change in the degradation slope due to the uncertainty associated with degradation patterns. - Highlights: • Discuss the relationship of degradation reduction and maintenance cost. • Determine the optimal interval of condition monitoring with minimal cost. • Identify the optimal degradation level after imperfect preventive repairs. • Discuss the effects of change in the slope of cumulative degradation.

  13. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  14. Optimal Inspection and Maintenance Strategies for Structural Systems

    DEFF Research Database (Denmark)

    Sommer, A. M.

    The aim of this thesis is to give an overview of conventional and optimal reliability-based inspection and maintenance strategies and to examine for specific structures how the cost can be reduced and/or the safety can be improved by using optimal reliability-based inspection strategies....... For structures with several almost similar components it is suggested that individual inspection strategies should be determined for each component or a group of components based on the reliability of the actual component. The benefit of this procedure is assessed in connection with the structures considered....... Furthermore, in relation to the calculations performed the intention is to modify an existing program for determination of optimal inspection strategies. The main purpose of inspection and maintenance of structural systems is to prevent or delay damage or deterioration to protect people, environment...

  15. National Infrastructure Maintenance Strategy and its implementation

    CSIR Research Space (South Africa)

    Wall, K

    2008-10-01

    Full Text Available The National Infrastructure Maintenance Strategy (NIMS) was approved by Cabinet in 2006. This Strategy sets overarching policy for sector-based initiatives and describes the framework for a coordinated programme of actions. It is an essential part...

  16. PRM-based patterns for knowledge formalisation of industrial systems to support maintenance strategies assessment

    International Nuclear Information System (INIS)

    Medina-Oliva, G.; Weber, P.; Iung, B.

    2013-01-01

    The production system and its maintenance system must be now developed on “system thinking” paradigm in order to guarantee that Key Performance Indicators (KPI) will be optimized all along the production system (operation) life. In a recursive way, maintenance system engineering has to integrate also KPI considerations with regards to its own enabling systems. Thus this paper develops a system-based methodology wherein a set of KPIs is computed in order to verify if the objectives of the production and maintenance systems are satisfied. In order to help the decision-making process for maintenance managers, a “unified” generic model have been developed. This model integrates (a) the interactions of the maintenance system with its enabling systems, (b) the impact of the maintenance strategies through the computation of some key performance indicators, and (c) different kinds of knowledge regarding the maintenance system and the system of interest, including quantitative and qualitative knowledge. This methodology is based on an executable unified model built with Probabilistic Relational Model (PRM). PRM allows a modular representation and inferences computation of large size models. The methodology added-value is shown on a test-bench

  17. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  18. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  19. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  20. EHV transmission maintenance. A total asset strategy

    International Nuclear Information System (INIS)

    Bronsdon, J.A.N.

    1996-01-01

    For countries whose economies are rapidly expanding, the demand for power, and in particular electricity, is resulting in rapid expansions of the generation, transmission and distribution of electricity. This means that a new plant is being installed which, apart from some minor post commissioning problems, will be free from major maintenance for several years to come. Consequently, in such cases, maintenance is confined to basic annual shutdown checks and routine online monitoring. As equipment and plant age it is important to commence planning for additional maintenance over and above these basic annual checks; to monitor performance; to monitor faults and defects and to use that information to engineer out design faults, to influence current maintenance techniques and to influence future procurement specifications. Also, provided that sufficient information is available, informed decisions can be taken as to when a power plant should be decommissioned or refurbished. This process can be described as a total asset management strategy covering all decisions from procurement through to commissioning, ongoing maintenance, refurbishment, decommissioning and reappraisal of specifications for future procurement. Based upon the author's experience within the United Kingdom Electricity Supply industry, a total asset strategy will be proposed for EHV transmission plant that will optimise current and future expenditure while maximizing reliability and minimising downtime. 1 ref., 5 figs

  1. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  2. Maintenance grouping strategy for multi-component systems with dynamic contexts

    International Nuclear Information System (INIS)

    Vu, Hai Canh; Do, Phuc; Barros, Anne; Bérenguer, Christophe

    2014-01-01

    This paper presents a dynamic maintenance grouping strategy for multi-component systems with both “positive” and “negative” economic dependencies. Positive dependencies are commonly due to setup cost whereas negative dependencies are related to shutdown cost. Actually, grouping maintenance activities can save part of the setup cost, but can also in the same time increase the shutdown cost. Until now, both types of dependencies have been jointly taken into account only for simple system structures as pure series. The first aim of this paper is to investigate the case of systems with any combination of basic structures (series, parallel or k-out-of n structures). A cost model and a heuristic optimization scheme are proposed since the optimization of maintenance grouping strategy for such multi-component systems leads to a NP-complete problem. Then the second objective is to propose a finite horizon (dynamic) model in order to optimize online the maintenance strategy in the presence of dynamic contexts (change of the environment, the working condition, the production process, etc). A numerical example of a 16-component system is finally introduced to illustrate the use and the advantages of the proposed approach in the maintenance optimization framework. - Highlights: • A dynamic grouping maintenance strategy for complex structure systems is proposed. • Impacts of the system structure on grouping maintenance are investigated. • A grouping approach based on the rolling horizon and GA algorithm is proposed. • Different dynamic contexts and their impacts on grouping maintenance are studied. • The proposed approach can help to update the maintenance planning in dynamic contexts

  3. Maintenance as a corporate strategy.

    Science.gov (United States)

    Clarke, D

    2000-11-01

    As we move towards the 21st century, those Manufacturing Industries that survive, will have changed their "efficiency" focus away from the conventional wisdom of "efficient individual tasks", to focus on the "effectiveness of a total manufacturing process". This seemingly insignificant change of emphasis, (from task to process) must include "the integration of process plant maintenance into the production process". Manufacturing companies, which do not include an effective plant maintenance strategy into their business strategy, will not survive the business environment of the 21st Century.

  4. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  5. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  6. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  7. Probabilistic sensitivity analysis of optimised preventive maintenance strategies for deteriorating infrastructure assets

    International Nuclear Information System (INIS)

    Daneshkhah, A.; Stocks, N.G.; Jeffrey, P.

    2017-01-01

    Efficient life-cycle management of civil infrastructure systems under continuous deterioration can be improved by studying the sensitivity of optimised preventive maintenance decisions with respect to changes in model parameters. Sensitivity analysis in maintenance optimisation problems is important because if the calculation of the cost of preventive maintenance strategies is not sufficiently robust, the use of the maintenance model can generate optimised maintenances strategies that are not cost-effective. Probabilistic sensitivity analysis methods (particularly variance based ones), only partially respond to this issue and their use is limited to evaluating the extent to which uncertainty in each input contributes to the overall output's variance. These methods do not take account of the decision-making problem in a straightforward manner. To address this issue, we use the concept of the Expected Value of Perfect Information (EVPI) to perform decision-informed sensitivity analysis: to identify the key parameters of the problem and quantify the value of learning about certain aspects of the life-cycle management of civil infrastructure system. This approach allows us to quantify the benefits of the maintenance strategies in terms of expected costs and in the light of accumulated information about the model parameters and aspects of the system, such as the ageing process. We use a Gamma process model to represent the uncertainty associated with asset deterioration, illustrating the use of EVPI to perform sensitivity analysis on the optimisation problem for age-based and condition-based preventive maintenance strategies. The evaluation of EVPI indices is computationally demanding and Markov Chain Monte Carlo techniques would not be helpful. To overcome this computational difficulty, we approximate the EVPI indices using Gaussian process emulators. The implications of the worked numerical examples discussed in the context of analytical efficiency and organisational

  8. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  9. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  10. Overview of progress on the European DEMO remote maintenance strategy

    Energy Technology Data Exchange (ETDEWEB)

    Crofts, Oliver, E-mail: oliver.crofts@ccfe.ac.uk [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Loving, Antony; Iglesias, Daniel [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Coleman, Matti [EUROfusion Consortium, PPP& T Department, Boltzmannstraße 2, 85748 Garching (Germany); Siuko, Mikko [VTT Technical Research Centre of Finland, PO Box 1000, FI-02044 VTT, Espoo (Finland); Mittwollen, Martin [KIT Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany); Queral, Vicente [CIEMAT Laboratorio Nacional de Fusión, Edif. 66, Avenida Complutense 40, 28040 Madrid (Spain); Vale, Alberto [IST, Instituto Superior Técnico, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Villedieu, Eric [CEA, IRFM, 13108 St Paul lez Durance (France)

    2016-11-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  11. Overview of progress on the European DEMO remote maintenance strategy

    International Nuclear Information System (INIS)

    Crofts, Oliver; Loving, Antony; Iglesias, Daniel; Coleman, Matti; Siuko, Mikko; Mittwollen, Martin; Queral, Vicente; Vale, Alberto; Villedieu, Eric

    2016-01-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  12. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    Science.gov (United States)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  13. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  14. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  15. A MAINTENANCE STRATEGY MODEL FOR STATIC EQUIPMENT USING INSPECTION METHODOLOGIES AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J.K. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Mechanical equipment used on process plants can be categorised into two main types, namely static and rotating equipment. A brief survey at a number of chemical process plants indicated that a number of maintenance strategies exist and are used for rotating equipment. However, some of these strategies are not directly applicable to static equipment, although the risk-based inspection (RBI methodology has been developed for pressure vessels. A generalised risk-based maintenance strategy for all types of static equipment does not currently exist. This paper describes the development of an optimised model of inspection methodologies, maintenance strategies, and risk management principles that are generically applicable for static equipment. It enables maintenance managers and engineers to select an applicable maintenance strategy and inspection methodology, based on the operational and business risks posed by the individual pieces of equipment.

    AFRIKAANSE OPSOMMING: Meganiese toerusting wat op prosesaanlegte gebruik word kan in twee kategorieë verdeel word, naamlik statiese en roterende toerusting. 'n Bondige ondersoek by 'n aantal chemiese prosesaanlegte het aangedui dat 'n aantal strategieë vir instandhouding van roterende toerusting gebruik word, terwyl die risikogebaseerde inspeksiemetodologie wel vir drukvate gebruik word. 'n Algemene risikogebaseerde instandhoudingstrategie vir alle tipes statiese toerusting is egter nie tans beskikbaar nie. Hierdie artikel beskryf die ontwikkeling van 'n geoptimeerde model van inspeksiemetodologieë, instandhoudingstrategieë, en risikobestuursbeginsels wat algemeen gebruik kan word vir statiese toerusting. Dit stel die instandhouding-bestuurders en -ingenieurs in staat om 'n instandhoudingstrategie en inspeksie-metodologie te kies, gebaseer op die operasionele en besigheidsrisiko's van die individuele toerusting.

  16. An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems

    International Nuclear Information System (INIS)

    Zhou, Yifan; Lin, Tian Ran; Sun, Yong; Bian, Yangqing; Ma, Lin

    2015-01-01

    Maintenance optimisation of series–parallel systems is a research topic of practical significance. Nevertheless, a cost-effective maintenance strategy is difficult to obtain due to the large strategy space for maintenance optimisation of such systems. The heuristic algorithm is often employed to deal with this problem. However, the solution obtained by the heuristic algorithm is not always the global optimum and the algorithm itself can be very time consuming. An alternative method based on linear programming is thus developed in this paper to overcome such difficulties by reducing strategy space of maintenance optimisation. A theoretical proof is provided in the paper to verify that the proposed method is at least as effective as the existing methods for strategy space reduction. Numerical examples for maintenance optimisation of series–parallel systems having multistate components and considering both economic dependence among components and multiple-level imperfect maintenance are also presented. The simulation results confirm that the proposed method is more effective than the existing methods in removing inappropriate maintenance strategies of multistate series–parallel systems. - Highlights: • A new method using linear programming is developed to reduce the strategy space. • The effectiveness of the new method for strategy reduction is theoretically proved. • Imperfect maintenance and economic dependence are considered during optimisation

  17. On Different Maintenance Strategies for Casted Components of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    . This maintenance tool uses Crude Monte Carlo Simulations to estimate the expected maintenance costs. Corrective and preventive maintenance strategies with a constant inspection interval or a condition monitoring system are considered. Furthermore, transportation from shore to the wind turbines by boat...... and transportation strategy. The case study shows that the maintenance expenses of casted components correspond to roughly 5% of the overall expected maintenance costs when using a corrective maintenance strategy. This amount can be decreased to roughly 2% when using a condition monitoring system and following...

  18. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  19. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  20. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  1. Development of high-immersive simulation system for designing maintenance strategy and its application to CLEAR-I

    International Nuclear Information System (INIS)

    Yang, Zihui; He, Tao; Shang, Leiming; Long, Pengcheng; Hu, Liqin

    2015-01-01

    Highlights: • A system was self-developed to simulate and verify the maintenance strategy. • Large-scale 3D radiation scene can be rapidly built and rendered in real-time. • A high efficiency simulation way was provided by tracking 6-DOF body motion. • It has been applied to CLEAR-I and proved maintenance strategy was feasible. - Abstract: The maintenance strategy is imperative and important to be considered in the design process of advanced nuclear reactor as early as possible. The design and validation of the maintenance strategy are key challenges which remain to be resolved due to the complex mechanical structure, the expensive physical mockup, and the potential risk of radiation hazards. In this paper, a high-immersive interactive simulation system has been developed to simulate and verify maintenance strategy by using virtual reality. Main features include: (1) rapid modeling and real-time rendering of the large-scale three-dimensional radiation scene, (2) real-time interactive roaming by tracking the 6-DOF body motion, (3) the interactive disassembly simulation of the mechanism structure were controlled by the hand gestures. The system can provide designers with an intuitive experience environment, an efficient and flexible interactive way as well as the whole process simulation of maintenance strategy. It has been applied to simulate and verify the maintenance strategy of the spallation target proton beam window for China LEAd-based research Reactor (CLEAR-I). The simulation result proved the maintenance strategy of proton beam window was reasonable and feasible. The system was useful to verify maintenance strategy, optimize maintenance operation, reduce intervention time and exposure dose of workers. It provided a high efficiency and low cost way for simulating maintenance strategy to meet the requirements of ALARA rules and can be extended to other nuclear facilities

  2. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  3. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  4. Short and long term maintenance strategy for reactor vessel head penetrations

    International Nuclear Information System (INIS)

    Teissier, A.; Heuze, A.

    1995-01-01

    This paper presents elements based on : surveys, operating inspection, theoretical studies, safety analysis, laboratory results, that enabled to determine maintenance options and short and long term strategies for processing on reactor vessel head leaks. (TEC). 1 tab

  5. A risk based model supporting long term maintenance and reinvestment strategy decision making

    Energy Technology Data Exchange (ETDEWEB)

    Sand, Kjell; Montard, Julien; Tremoen, Tord H.

    2010-02-15

    This Technical Report is a product from the project Risk-Based Distribution System Asset Management (short: RISK DSAM) - Work Package 3 Risk exposure on company/strategic level. In the report a concept for portfolio distribution system asset management is presented. The approach comprises four main steps: 1. Decide the asset base. 2. Divide the asset base into relevant archetypes. 3. Develop or select relevant maintenance and reinvestment strategies for the different archetypes. 4. Estimate risks and costs for each archetype for the relevant strategies. For the different steps guidelines are given and a proposal for implementation of the concept is given in terms of a proposed IT system architecture.To evaluate the feasibility of such a concept, a prototype was developed in by using Visual Basic macros in Excel using real technical data from a small DSO. The experience from using the prototype shows that the concept is realistic. All assets are included and depending of the ambition of the risk analysis both simple simulation models and more advanced might be embedded. Presentations of the concept for a utility engineers have receive positive feedback indicating that the concept is regarded as a practical way to develop risk based asset management strategies for the asset fleet. It should be noted that the concept should be applied on a company strategic level and is thus not designed to be applied for a specific project or asset decisions. For this, more detailed models with area specific information, topology etc. are needed. (Author)

  6. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  7. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  8. Development of an evaluation method for optimization of maintenance strategy in commercial plant

    International Nuclear Information System (INIS)

    Ito, Satoshi; Shiraishi, Natsuki; Yuki, Kazuhisa; Hashizume, Hidetoshi

    2006-01-01

    In this study, a new simulation method is developed for optimization of maintenance strategy in NPP as a multiple-objective optimization problem (MOP). The result of operation is evaluated as the average of the following three measures in 3,000 trials: Cost of Electricity (COE) as economic risk, Frequency of unplanned shutdown as plant reliability, and Unavailability of Regular Service System (RSS) and Engineering Safety Features (ESF) as safety measures. The following maintenance parameters are considered to evaluate several risk in plant operation by changing maintenance strategy: planned outage cycle, surveillance cycle, major inspection cycle, and surveillance cycle depending on the value of Fussel-Vesely importance measure. By using the Decision-Making method based on AHP, there are individual tendencies depending on individual decision-maker. Therefore this study could be useful for resolving the problem of maintenance optimization as a MOP. (author)

  9. Maintenance management sourcing strategies and the condition of ...

    African Journals Online (AJOL)

    In the face of the deplorable state of buildings across the various tertiary institutions in Nigeria, the need to deploy appropriate maintenance management strategy cannot be overemphasized. However, sourcing decision for maintenance services remains a tough one for decision makers as different sourcing option suit ...

  10. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  11. Tools to support maintenance strategies under soft soil conditions

    Directory of Open Access Journals (Sweden)

    J. W. M. Lambert

    2015-11-01

    Full Text Available Costs for maintenance of infrastructure in municipalities with soft soil underground conditions, are estimated to be almost 40 % higher than in others. As a result, these municipalities meet financial problems that cause overdue maintenance. In some cases municipalities are even afraid to be unable to offer a minimum service level in future. In common, traditional practice, roads and sewerage systems have been constructed in trenches that consist of sandy material that replaces the upper meters of the soft soil. Under influence of its weight, this causes accelerated settlements of the construction. A number of alternative constructions have been developed, e.g. using light-weight materials to limit settlement velocity. In order to limit future maintenance costs, improvement of maintenance strategies is desired. Tools have been and will be developed to support municipalities in improving their maintenance strategies and save money by doing that. A model (BALANS that weighs the attractiveness of alternative solutions under different soil, environmental and economic circumstances, will be presented.

  12. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  13. Maintenance strategies and safety on a deregulated market. Mapping of changes in maintenance strategies and their possible consequences

    International Nuclear Information System (INIS)

    Kecklund, Lena

    2004-11-01

    interviewed. The results indicate, in accordance with other research results, that rationalisations and changes must be combined with work development and the participation of the employees to be successful. Outsourcing has been used for some activities. All the companies have established a joint maintenance department for their units. The companies have been moving towards lean organization which has increased the work load of the staff. Therefore more planning is required to get a optimal resource allocation, to avoid problems at work peaks. All the plants have abandoned a downright customer-supplier relation for the benefit of one competent maintenance supplier with a comprehensive view. As a result the contractual undertaking of the maintenance department towards the production units is made on a long term basis. The new maintenance strategy is based on status controls for condition based maintenance and on riskbased analysing methods. There are modern computer-based maintenance systems at all the plants. Computer-based instruments are used direct in the production line where they require a competence shift in the staff. Positive effects that appeared in the interviews are better possibilities for experience feed back and methods development, access to a wider and larger competence and a joint working method. The results show that there are already some positive effects and there are more to be expected. But it is also clear that these effects have neither come as easily nor as fast as was expected. Possible negative effects: there is a risk that the staffing might be too scarce, especially in work peaks, e.g. unexpected shutdowns. A high work load and much overtime work mean greater strain on the staff. Problems with job satisfaction and motivation, chiefly after the change to a matrix organisation. Uncertainties as to responsibility and roles in the new organisation. The practical competence might 'disappear' in the present competence shift focusing on analytical

  14. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  15. Cost modelling in maintenance strategy optimisation for infrastructure assets with limited data

    International Nuclear Information System (INIS)

    Zhang, Wenjuan; Wang, Wenbin

    2014-01-01

    Our paper reports on the use of cost modelling in maintenance strategy optimisation for infrastructure assets. We present an original approach: the possibility of modelling even when the data and information usually required are not sufficient in quantity and quality. Our method makes use of subjective expert knowledge, and requires information gathered for only a small sample of assets to start with. Bayes linear methods are adopted to combine the subjective expert knowledge with the sample data to estimate the unknown model parameters of the cost model. When new information becomes available, Bayes linear methods also prove useful in updating these estimates. We use a case study from the rail industry to demonstrate our methods. The optimal maintenance strategy is obtained via simulation based on the estimated model parameters and the strategy with the least unit time cost is identified. When the optimal strategy is not followed due to insufficient funding, the future costs of recovering the degraded asset condition are estimated

  16. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  17. Heuristic hybrid game approach for fleet condition-based maintenance planning

    International Nuclear Information System (INIS)

    Feng, Qiang; Bi, Xiong; Zhao, Xiujie; Chen, Yiran; Sun, Bo

    2017-01-01

    The condition-based maintenance (CBM) method is commonly used to select appropriate maintenance opportunities according to equipment status over a period of time. The CBM of aircraft fleets is a fleet maintenance planning problem. In this problem, mission requirements, resource constraints, and aircraft statuses are considered to find an optimal strategy set. Given that the maintenance strategies for each aircraft are finite, fleet CBM can be treated as a combinatorial optimization problem. In this study, the process of making a decision on the CBM of military fleets is analyzed. The fleet CBM problem is treated as a two-stage dynamic decision-making problem. Aircraft are divided into dispatch and standby sets; thus, the problem scale is significantly reduced. A heuristic hybrid game (HHG) approach comprising a competition game and a cooperative game is proposed on the basis of heuristic rule. In the dispatch set, a competition game approach is proposed to search for a local optimal strategy matrix. A cooperative game method for the two sets is also proposed to ensure global optimization. Finally, a case study regarding a fleet comprising 20 aircraft is conducted, with the results proving that the approach efficiently generates outcomes that meet the mission risk-oriented schedule requirement. - Highlights: • A new heuristic hybrid game method for fleet condition-based maintenance is proposed. • The problem is simplified by hierarchical solving based on dispatch and standby set. • The local optimal solution is got by competition game algorithm for dispatch set. • The global optimal solution is got by cooperative game algorithm between two sets.

  18. Navy Ship Maintenance: Action Needed to Maximize New Contracting Strategys Potential Benefits

    Science.gov (United States)

    2016-11-01

    implementation of the new strategy, the Navy conducted market research and pilot-tested attributes of the strategy with pilot maintenance periods for a...readiness strategy and, in 2015, introduction of a new contracting strategy for ship repair, referred to as MAC-MO. House Report 114-102 accompanying the...Maintenance Letter 1 Background 3 Market Research and Piloting Helped Inform Roll-out of MAC-MO Strategy, Which Offers Potential Benefits

  19. A Framework to Determine the Effectiveness of Maintenance Strategies Lean Thinking Approach

    Directory of Open Access Journals (Sweden)

    Alireza Irajpour

    2014-01-01

    Full Text Available The purpose of this paper is to provide a framework that can identify and evaluate the effectiveness of a given maintenance strategy and to rank components of maintenance system. The framework is developed using DEMATEL method on maintenance strategy as a guideline. To gain a richer understanding of the framework, a questionnaire is constructed and answered by experts. Then the DEMATEL method is applied to analyze the importance of criteria and the casual relations among the criteria are constructed. The scope of the paper is limited to performance measurement of maintenance strategies. It is found that the framework is applicable and useful for the strategic management of the maintenance function. It is observed that the influencing and preferred infrastructures for designing Learning and Training are three components, that is, optimal maintenance, CMMS, and RCM which are interdependent on each other and are the fundamental components to realize the designed goals of maintenance process. This paper provides an overview of research and developments in the measurement of maintenance performance. Many tools and techniques have been developed in other fields. However, the applicability of those tools to maintenance function has never been tried. In that respect this topic is novel. It helps in managing maintenance more effectively.

  20. Progress with the national infrastructure maintenance strategy

    CSIR Research Space (South Africa)

    Wall, K

    2008-07-01

    Full Text Available infrastructure investment and maintenance that will result from this strategy will not only improve infrastructure performance and underpin services sustainability, but will also contribute significantly towards national and local economic growth and will add...

  1. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  2. Predictive maintenance strategy in the graphics departament of a tobacco company

    Directory of Open Access Journals (Sweden)

    Guilherme Francez Toazza

    2015-09-01

    Full Text Available The purpose of this article was to describe the implementation of a strategy for Predictive Maintenance in the graphics department of the company Souza Cruz SA after the techniques of Vibration Analysis, Thermography, Ferrography and Inspection Sensitive. The research method was the action-research. The proposed study is the application of a management Predictive Maintenance acting strategically within the context in which it is embedded. The article reviews the theoretical concepts and Predictive Maintenance techniques mentioned above. In the survey, were raised in the information system of the company, the rate of breakdown of equipment (downtime, waste energy costs, maintenance costs and availability of H / h (man / hour and availability of equipment for the production the period prior to the implementation of a predictive maintenance management and consistent compared with results after this deployment. From the results obtained, it was evident that only preventive maintenance, combined with a model predictive maintenance is not poor enough to maintain the desired reliability in a department of great importance to your company. So, it is possible to say that the implementation of a predictive maintenance strategy can make the Maintenance sector to work strategically with common goals to the company as a whole.

  3. A review on condition-based maintenance optimization models for stochastically deteriorating system

    International Nuclear Information System (INIS)

    Alaswad, Suzan; Xiang, Yisha

    2017-01-01

    Condition-based maintenance (CBM) is a maintenance strategy that collects and assesses real-time information, and recommends maintenance decisions based on the current condition of the system. In recent decades, research on CBM has been rapidly growing due to the rapid development of computer-based monitoring technologies. Research studies have proven that CBM, if planned properly, can be effective in improving equipment reliability at reduced costs. This paper presents a review of CBM literature with emphasis on mathematical modeling and optimization approaches. We focus this review on important aspects of the CBM, such as optimization criteria, inspection frequency, maintenance degree, solution methodology, etc. Since the modeling choice for the stochastic deterioration process greatly influences CBM strategy decisions, this review classifies the literature on CBM models based on the underlying deterioration processes, namely discrete- and continuous-state deterioration, and proportional hazard model. CBM models for multi-unit systems are also reviewed in this paper. This paper provides useful references for CBM management professionals and researchers working on CBM modeling and optimization. - Highlights: • A review on Condition-based maintenance (CBM) optimization models is presented. • The CBM models are classified based on the underlying deterioration processes. • Existing CBM models for both single- and multi-unit systems are reviewed. • Future essential research directions on CBM are identified.

  4. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  5. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process

    Directory of Open Access Journals (Sweden)

    Aida Azizi

    2014-05-01

    Full Text Available This paper presents an empirical investigation to rank different factors influencing on maintenance strategies on Iranian oil terminals’ company. The study determines four main factors, production quality, reliability, cost and safety. Using fuzzy analytical process, the study determines various factors associated with each main factor and ranks them by performing pair-wise comparisons. The results indicate that reliability ranks first (0.255, followed by production quality (0.252, cost (0.25 and safety (0.244. In terms of reliability, the best utilization of resources is number one priority followed by increase access to maintenance tools, reduction in production interruption are among the most important issues. In terms of production quality, reduction in system failure as well as reworks is the most important factors followed by customer satisfaction and defects. In terms of cost items, ease of access to accessories and consulting are important factors followed by necessary software, hardware and training programs. Finally, in terms of safety factors, external, internal and employee services are the most important issues, which are needed to be considered.

  6. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  7. Risk-Based Maintenance Assessment in the Manufacturing Industry: Minimisation of Suboptimal Prioritisation

    Directory of Open Access Journals (Sweden)

    Ratnayake R.M. Chandima

    2017-03-01

    Full Text Available Manufacturing firms continuously strive to increase the efficiency and effectiveness in the maintenance management processes. Focus is placed on eliminating the unexpected failures which cause unnecessary costs and the production losses. Risk-based maintenance (RBM strategies enable to address the above through the identification of probability and consequences of potential failures whilst providing a way for prioritisation of maintenance actions based on the risk of possible failures. Such prioritisations enable to identify the optimal maintenance strategy, intervals of maintenance tasks, and optimal level of spare parts inventory. However, the risk assessment activities are performed with the support of a risk matrix. Suboptimal classifications and/or prioritisations arise due to the inherent nature of the risk matrix. This is caused by the fact that there are no means to incorporate actual circumstances at the boundary of the input ranges or at the levels of linguistic data and risk categories. In this paper, a risk matrix is first developed in collaboration with one of the manufacturing firms in Poland. Then, it illustrates the use of fuzzy logic for minimisation of suboptimal prioritisation and/or classifications using a fuzzy inference system (FIS together with illustrative membership functions and a rule base. Finally, an illustrative risk assessment is also demonstrated to illustrate the methodology.

  8. E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation

    OpenAIRE

    Böttcher, O

    2003-01-01

    The new ST-HM contract E072 for the maintenance of transport and handling equipment is designed to obtain the high operating reliability as required for the LHC installation and to respect the situation of limited resources at CERN at the same time. The contract is based on a dynamic maintenance strategy. It contains a flexible maintenance contingent that is essential to prepare the equipment for extremely important and critical utilization phases that will come up during the LHC installation...

  9. Maintenance strategy for tilting table of rolling mill based on reliability considerations

    International Nuclear Information System (INIS)

    Deshpande, V.S.; Modak, J.P.

    2003-01-01

    tilting tables are 14 scheduled on-condition tasks, 10 scheduled on-restoration tasks, seven scheduled discard task. Whereas for 14 failure modes no scheduled maintenance has been proposed. Existing maintenance schedule for tilting tables indicates the maintenance action as and when required. Hence RCM based schedule specifies that additional preventive maintenance tasks need to be executed as compared to none initially. Cost incurred for this can be offset from the savings accrued from reduction in loss of production due to repetitive breakdowns. The methodology of RCM adopted in western industries cannot be applied as it is to Indian industries because of labour oriented nature, partially computerised information systems, non-availability of the information about cost of loss of production due to breakdown and age-reliability pattern of equipment, insufficient maintenance database. These problems can be overcome by development of sound MMIS, formulation of RCM review group and imparting suitable training to acquire the relevant skills in RCM. Thus RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimisation of preventive maintenance cost. This can further boost up the prospects of Indian industry to offer the products at globally competitive prices

  10. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  11. Development Of Optimum Maintenance amp Rehabilitation Strategies For Urban Bituminous Concrete Surfaced Roads

    Directory of Open Access Journals (Sweden)

    Dr Pardeep Kumar Gupta

    2015-02-01

    Full Text Available ABSTRACT In India the road traffic volume has increased manifolds during the post-independence period. The traffic axle loading may also in many cases be much heavier than the specified limit. As a result of which the existing road network has been subjected to severe deterioration leading to premature failure of the pavements.In such a scenario development of the effective pavement management strategies would furnish useful information to ensure the compatible and cost- effective decisions so as to keep the existing road network intact. The pavement deterioration models can prove to be an effective tool which can assist highway agencies to forecast economic and technical outcome of possible investment decisions regarding maintenance management of pavements. The optimum maintenance and rehabilitation strategies developed in this study would be useful in planning pavement maintenance strategies in a scientific manner and ensuring rational utilization of limited maintenance funds. Once this strategy for urban road network is implemented and made operational this would serve as window to the other urban road network of different regions.

  12. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  13. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  14. An Optimization Method for Condition Based Maintenance of Aircraft Fleet Considering Prognostics Uncertainty

    Directory of Open Access Journals (Sweden)

    Qiang Feng

    2014-01-01

    Full Text Available An optimization method for condition based maintenance (CBM of aircraft fleet considering prognostics uncertainty is proposed. The CBM and dispatch process of aircraft fleet is analyzed first, and the alternative strategy sets for single aircraft are given. Then, the optimization problem of fleet CBM with lower maintenance cost and dispatch risk is translated to the combinatorial optimization problem of single aircraft strategy. Remain useful life (RUL distribution of the key line replaceable Module (LRM has been transformed into the failure probability of the aircraft and the fleet health status matrix is established. And the calculation method of the costs and risks for mission based on health status matrix and maintenance matrix is given. Further, an optimization method for fleet dispatch and CBM under acceptable risk is proposed based on an improved genetic algorithm. Finally, a fleet of 10 aircrafts is studied to verify the proposed method. The results shows that it could realize optimization and control of the aircraft fleet oriented to mission success.

  15. The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways

    Directory of Open Access Journals (Sweden)

    Tetria Yunik Dewi Pamungkas

    2017-01-01

    Full Text Available It is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recommendations for management improvement of track maintenance by researching the track maintenance management system in Network Rail. This research study is based on secondary data. The analysis was conducted by using comparison method which compares the British Railways management and Indonesia railway management related to track maintenance management. The track maintenance management system was studied by using Network Rail. The results were compared with track maintenance management system in Indonesia. The comparison will provide the data differences that evaluated so the problem can be identified. The final result of this analysis was the identification of problems and improvisation that can be done for the development of track maintenance management in Indonesia. Several management issues have been mapped to several groups: finance management, structure organization, and asset management. From the problems that have been mapped, some improvements are recommended as monopolist authority restriction, maintenance system contract extension, re-structuring organization hierarchy, business plan consideration, track monitoring strategy arrangement, and condition based maintenance strategy adoption.

  16. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    Directory of Open Access Journals (Sweden)

    Burhanuddin M. A.

    2011-01-01

    Full Text Available Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it consider two factors only, that is, downtime and frequency of failures. We consider third factor, cost, in this study for failure-based maintenance. The objective of this paper is to introduce the formulae to estimate maintenance cost. Methods. Fish bone analysis conducted with Ishikawa model and Decision Making Grid methods are used in this study to reveal some underlying risk factors that delay failure-based maintenance. The goal of the study is to estimate the risk factor that is, repair cost to fit in the Decision Making Grid model. Decision Making grid model consider two variables, frequency of failure and downtime in the analysis. This paper introduces third variable, repair cost for Decision Making Grid model. This approaches give better result to categorize the machines, reduce cost, and boost the earning for the manufacturing plant. Results. We collected data from one of the food processing factories in Malaysia. From our empirical result, Machine C, Machine D, Machine F, and Machine I must be in the Decision Making Grid model even though their frequency of failures and downtime are less than Machine B and Machine N, based on the costing analysis. The case study and experimental results show that the cost analysis in Decision Making Grid model gives more promising strategies in failure-based maintenance. Conclusions. The improvement of Decision Making Grid model for decision analysis with costing analysis is our contribution in this paper for

  17. Present Status and Future Growth of Advanced Maintenance Technology and Strategy in US Manufacturing.

    Science.gov (United States)

    Jin, Xiaoning; Weiss, Brian A; Siegel, David; Lee, Jay

    2016-01-01

    The goals of this paper are to 1) examine the current practices of diagnostics, prognostics, and maintenance employed by United States (U.S.) manufacturers to achieve productivity and quality targets and 2) to understand the present level of maintenance technologies and strategies that are being incorporated into these practices. A study is performed to contrast the impact of various industry-specific factors on the effectiveness and profitability of the implementation of prognostics and health management technologies, and maintenance strategies using both surveys and case studies on a sample of U.S. manufacturing firms ranging from small to mid-sized enterprises (SMEs) to large-sized manufacturing enterprises in various industries. The results obtained provide important insights on the different impacts of specific factors on the successful adoption of these technologies between SMEs and large manufacturing enterprises. The varying degrees of success with respect to current maintenance programs highlight the opportunity for larger manufacturers to improve maintenance practices and consider the use of advanced prognostics and health management (PHM) technology. This paper also provides the existing gaps, barriers, future trends, and roadmaps for manufacturing PHM technology and maintenance strategy.

  18. Condition-based maintenance effectiveness for series–parallel power generation system—A combined Markovian simulation model

    International Nuclear Information System (INIS)

    Azadeh, A.; Asadzadeh, S.M.; Salehi, N.; Firoozi, M.

    2015-01-01

    Condition-based maintenance (CBM) is an increasingly applicable policy in the competitive marketplace as a means of improving equipment reliability and efficiency. Not only has maintenance a close relationship with safety but its costs also make it even more attractive issue for researchers. This study proposes a model to evaluate the effectiveness of CBM policy compared to two other maintenance policies: Corrective Maintenance (CM) and Preventive Maintenance (PM). Maintenance policies are compared through two system performance indicators: reliability and cost. To estimate the reliability and costs of the system, the proposed Markovian discrete-event simulation model is developed under each of these policies. The applicability and usefulness of the proposed Markovian simulation model is illustrated for a series–parallel power generation system. The simulated characteristics of CBM system include its prognostics efficiency to estimate remaining useful life of the equipment. Results show that with an efficient prognostics, CBM policy is an effective strategy compared to other maintenance strategies. - Highlights: • A model is developed to evaluate the effectiveness of CBM policy. • Maintenance policies are compared through reliability and cost. • A Markovian simulation model is developed. • A series–parallel power generation system is considered. • CBM is an effective strategy compared to others

  19. Check and maintenance strategies and practice

    International Nuclear Information System (INIS)

    Buettner, W.E.

    1982-01-01

    There exists no uniform test and maintenance strategy for instrumentation and control in German nuclear power plants. The procedures vary according to the plant type (PWR or BWR), the utility and the licensing authority responsible for the plant, but there are common aspects and also requirements from regulatory guides. This common main aspects are treated and exemplified in this lecture. The lecture is confined to operational procedures and preoperational or commissioning tests will be not described in spite of the fact that commissioning procedures may look like operational procedures. (orig./RW)

  20. Risk-based equipment removal guide for on-line maintenance at PSE ampersand G

    International Nuclear Information System (INIS)

    Knoll, A.; Smith, C.; Pollock, J.

    1995-01-01

    On-line maintenance plays an important role in achieving safe and reliable power generation in a nuclear power plant. However, maintenance, if not properly planned and performed, may also be an important contributor to plant risk. Therefore, plant-specific procedures are needed for equipment removal from service to enhance the benefits of on-line maintenance and minimize the risks involved. The problem is to identify and implement the most effective on-line maintenance policy in the form of a proceduralized guide to assure plant safety under various operation and maintenance constraints. This paper presents a methodology to develop plant-specific on-line maintenance strategies and acceptance criteria using a multivariate safety approach based on risk assessment. Based on plant-specific data as modeled in the individual plant evaluation (IPE) and the updated probabilistic safety assessment (PSA), the risk-based methodology is currently being applied to the development of proceduralized equipment removal guides at Hope Creek and Salem units 1 and 2 of Public Service Electric and Gas Company (PSE ampersand G)

  1. Review on the Pavement-repairing Measures as a Condition for the Choice of Road-Maintenance Strategy

    Directory of Open Access Journals (Sweden)

    Nedevska Ivana

    2017-01-01

    Full Text Available The road-maintenance strategies vary from one country to another, and even between the road management authorities within a one single country. It is not surprising, as there is not best maintenance method, nor a universal set of strategies that can be applied equally everywhere. Generally, there are strategies acceptable in certain conditions, but the factors influencing the selection process are diverse and very complex. This paper will present a review of the various measures that can be applied on the roads, which is certainly the basic condition of selection of an appropriate maintenance strategy.

  2. National infrastructure maintenance strategy for South Africa

    CSIR Research Space (South Africa)

    Wall, K

    2009-05-01

    Full Text Available Conference, Addis Ababa, Ethiopia, 2009 WATER, SANITATION AND HYGIENE: SUSTAINABLE DEVELOPMENT AND MULTISECTORAL APPROACHES A National Infrastructure Maintenance Strategy for South Africa Kevin Wall, South Africa [OFFICE USE ONLY: REVIEWED...; − effects on human health and economic growth; − lack of effective countermeasures in the event of failure of the service; and − the risk generally to government's growth objectives. Wastewater treatment works are often problematic, as are water...

  3. The safety monitor and RCM workstation as complementary tools in risk based maintenance optimization

    International Nuclear Information System (INIS)

    Rawson, P.D.

    2000-01-01

    Reliability Centred Maintenance (RCM) represents a proven technique for rendering maintenance activities safer, more effective, and less expensive, in terms of systems unavailability and resource management. However, it is believed that RCM can be enhanced by the additional consideration of operational plant risk. This paper discusses how two computer-based tools, i.e., the RCM Workstation and the Safety Monitor, can complement each other in helping to create a living preventive maintenance strategy. (author)

  4. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    Science.gov (United States)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  5. The Comparison of Effectiveness of Cognitive-Behavioral Group Therapy Based on Coping Skills and Methadone Maintenance Treatment in Improvement of Emotional Regulation Strategies and Relapse Prevention

    Directory of Open Access Journals (Sweden)

    Tahereh Ghorbany

    2011-05-01

    Full Text Available Purpose: This study compared the effectiveness of group cognitive-behavioral therapy based on coping skills (CBT and methadone maintenance therapy (MMT in improvement of emotional regulation strategies and prevention of relapse. Method: The method of the present study was semi-experimental research design (pre-test-post-test with witness group. For sampling 45 substance abuse people who had referred to addiction treatment centers were selected and assigned to three groups of cognitive behavior therapy, methadone maintenance treatment and witness group randomly. The participants in all three groups completed the emotional intelligence questionnaire before and after the intervention. Data were analyzed by covariance method. Results: The results showed that cognitive-behavior therapy in comparison to methadone maintenance therapy and witness group led to significant improvement of emotional regulation in substance abusers, but there was no significant difference between the methadone maintenance treatment group and control group. Also, the rate of relapse in individuals who assigned to cognitive-behavior therapy group in comparison to methadone maintenance therapy and the witness group was significantly lower, but there was no significant difference between methadone therapy and witness. Conclusion: Cognitive-behavior therapy was an effective treatment that can change the cognitive and behavioral variables related to substance abuse, such as emotional regulation strategies. Thus, results suggested that drug abuse treatment programs must target these mediator variables.

  6. Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

    Directory of Open Access Journals (Sweden)

    L. Tlili

    2015-01-01

    Full Text Available We consider production systems which generate damage to environment as they get older and degrade. The system is submitted to inspections to assess the generated environmental damage. The inspections can be periodic or nonperiodic. In case an inspection reveals that the environmental degradation level has exceeded the critical level U, the system is considered in an advanced deterioration state and will have generated significant environmental damage. A corrective maintenance action is then performed to renew the system and clean the environment and a penalty has to be paid. In order to prevent such an undesirable situation, a lower threshold level L is considered to trigger a preventive maintenance action to bring back the system to a state as good as new at a lower cost and without paying the penalty. Two inspection policies are considered (periodic and nonperiodic. For each one of them, a mathematical model and a numerical procedure are developed to determine simultaneously the preventive maintenance (PM threshold L∗ and the inspection sequence which minimize the average long-run cost per time unit. Numerical calculations are performed to illustrate the proposed maintenance policies and highlight their main characteristics with respect to relevant input parameters.

  7. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  8. Teachers' High Maintenance Behaviour as Perceived by University Students in Taiwan, and Their Coping Strategies

    Science.gov (United States)

    Hong, Fu-Yuan; Cheng, Kuang-Tsan

    2014-01-01

    Using a questionnaire survey, this study probed into interpersonal cues and characteristics of teachers' high maintenance behaviors perceived by university students and their coping strategies, and then analyzed the relationship between their perceived high maintenance behaviors and the dimensions of their coping strategies. The Scale of Teachers'…

  9. Investigation of an innovative maintenance contracting strategy : the performance-based maintenance contract (PBMC).

    Science.gov (United States)

    2015-06-01

    One of the major responsibilities of state Departments of Transportation (DOTs) is to maintain their road assets so : that road users can travel cost effectively, safely, and in a timely manner. Maintenance projects can be performed : either by using...

  10. Different genome maintenance strategies in human and tobacco cells.

    Science.gov (United States)

    Pelczar, Pawel; Kalck, Véronique; Kovalchuk, Igor

    2003-08-22

    In this work, genome maintenance strategies of organisms belonging to different kingdoms (animals versus plants) but of similar genome size were investigated using a novel, universal double-strand break (DSB) repair assay. Different plasmids linearised with KpnI, Acc65I or EcoRV yielding either 3' or 5' protruding or blunt DNA termini, respectively, were transfected into HeLa cells and Nicotiana plumbaginifolia protoplasts and assayed for the efficiency and fidelity of DSB repair. We show that the mechanism of break sealing is similar but that drastic differences are seen in the fidelity of repair: in HeLa cells, 50-55% DSBs were repaired precisely, compared to as little as 15-30% in tobacco cells. Moreover, the DSB repair in plants resulted in 30-40% longer deletions and significantly shorter insertions. Combined, these led to more than twofold larger net DNA loss in tobacco cells. Our observations point to possible differences in the strategies of DSB repair and genome maintenance in plants and animals.

  11. Analysis of the possibility of applying a condition-based maintenance model on an example of tank weapons

    Directory of Open Access Journals (Sweden)

    Igor J. Epler

    2013-12-01

    Full Text Available For any modern army it is very important to continuously maintain a high degree of operational (combat readiness (availability in order to maximize the effectiveness of the use of technical systems. Since determination and prediction of technical states and failures of technical systems in engineering, especially in armament, are difficult due to the impossibility of continuous condition monitoring with appropriate measuring equipment there is a need for a maintenance model that would be most helpful in taking timely action maintenance. In this paper, the subject of research is a model of maintenance of the M-84 tank  weapoons systems.   IntroductionThe M-84 tank is one of the most promising technical systems in the Serbian Army. Its use and modifications are foreseen in the next ten years. The  M-84 is characterized by good tactical and technical characteristics. It has a powerful 125 mm cannon, coupled 7.62 mm machine gun and 12.7 mm anti-aircraft machine gun. The M-84 tank has an automatic battery charger and a fire control system. The fire control system enables fast target tracking and stabilization of the cannon barrel, which is a prerequisite for timely and favorable effect on the target. There are certain ambiguities in the existing model of maintenance of tank weapons.   Technical diagnostics Technical diagnostics, as a part of the process of condition-based maintenance, should determine technical conditions of components or technical systems with certain accuracy at a point in time.   Maintenance strategy A maintenance strategy can be defined as a variant of a maintenance system determined by a concept, organization and character of maintenance procedures, as well as the relationship between the various levels at which maintenance is performed. It is defined for technical system parts, individual technical systems and for system maintenance as a whole. The basic maintenance strategies implemented today are: -      corrective

  12. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  13. Strategije održavanja tehničkih sistema / Technical system maintenance strategies

    Directory of Open Access Journals (Sweden)

    Petar Stanojević

    2003-11-01

    Full Text Available U ovom radu dat je pregled novih naučnih saznanja koja su dovela do promena u sadržaju strategija koje se mogu primeniti u sistemu održavanja tehničkih sistema. Analizirana je suština relevantnih strategija održavanja, prednosti nedostatci i efekti koje nosi njihova primena. / This paper gives a survey of recent scientific achievements which has brought changes into the strategies applicable in technical system maintenance systems. The essence of relevant maintenance strategies has been analyzed as well as the advantages disadvantages and effects of their application.

  14. Selecting the most appropriate maintenance strategies using fuzzy Analytic Network Process: A case study of Saipa vehicle industry

    Directory of Open Access Journals (Sweden)

    Mina Rahimi

    2014-04-01

    Full Text Available It is necessary for companies and industries to select the most appropriate maintenance strategy to increase the reliability and safety level with reasonable cost. The primary objective of this paper is to assess different maintenance strategies and to select the best and the most appropriate alternatives for Saipa vehicle industry in Tehran, Iran. For this purpose, we simultaneously consider numerous conflicting objectives and constraints. In this study to counter with this conflicting and to consider the dependency among the qualitative and quantitative criteria and sub-criteria, an integration of Analytic Network Process (ANP and fuzzy set theory are considered. Therefore, factors playing important role in selecting the best maintenance strategy are determined by reviewing the research literature and interviewing with the experts by Delphi technique. Considering the relations among different factors, a network with 4 criteria and 28 sub-criteria are proposed. In the next step, ANP technique is applied for ranking effective factors in evolution of appropriate maintenance strategy. Results reveal that the best maintenance strategy for fixture body of pride (setter is corrective maintenance.

  15. Maintenance cost optimization in condition based maintenance: a case study for critical facilities

    OpenAIRE

    Filippo De Carlo; Maria Antonietta Arleo

    2013-01-01

    The increasing availability required to industrial plants and the limited budget often existing to assure it, require a careful formulation of maintenance optimization models. This need is primary for process plants, for which minimization of stops and maximization of their availability, are essential for ensuring targeted production and, therefore, profitability. In this context, the choice of the maintenance strategy is hence fundamental, depending on the system features and then on the eff...

  16. Optimization of maintenance strategies in case of data uncertainties; Optimierung von Instandhaltungsstrategien bei unscharfen Eingangsdaten

    Energy Technology Data Exchange (ETDEWEB)

    Aha, Ulrich

    2013-07-01

    Maintenance strategies are aimed to keep a technical facility functioning in spite of damaging processes (wear, corrosion, fatigue) with simultaneous control of these processes. The project optimization of maintenance strategies in case of data uncertainties is aimed to optimize maintenance measures like preventive measures (lubrication etc.), inspections and replacements to keep the facility/plant operating including the minimization of financial costs. The report covers the following topics: modeling assumptions, model development and optimization procedure, results for a conventional power plant and an oxyfuel plant.

  17. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...

  18. Investigating the Optimal Management Strategy for a Healthcare Facility Maintenance Program

    National Research Council Canada - National Science Library

    Gaillard, Daria

    2004-01-01

    ...: strategic partnering with an equipment management firm. The objective of this study is to create a decision-model for selecting the optimal management strategy for a healthcare organization's facility maintenance program...

  19. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  20. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  1. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  2. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  3. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  4. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  5. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  6. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    OpenAIRE

    G. Waeyenbergh; L. Pintelon; L. Gelders

    2012-01-01

    Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised mainten...

  7. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  8. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  9. Information-Based Maintenance Optimization with Focus on Predictive Maintenance (Informatiegebaseerde onderhoudsoptimalisatie met focus op predictief onderhoud)

    OpenAIRE

    Van Horenbeek, Adriaan

    2013-01-01

    This dissertation presents an information-based maintenance optimization methodology for physical assets; with focus on, but not limited to, predictive maintenance (PdM). The overall concept of information-based maintenance is that of updating maintenance decisions based on evolving knowledge of operation history and anticipated usage of the machinery, as well as the physics and dynamics of material degradation in critical machinery components. Within this concept, predictive maintenance is a...

  10. Analiza efekata uvođenja savremenih strategija održavanja / Effects of introducing modern maintenance strategies and their analysis

    Directory of Open Access Journals (Sweden)

    Petar Stanojević

    2003-07-01

    Full Text Available Često se postavlja pitanje opravdanosti investicija za unapređivanje sistema održavanja. Uvođenje strategija održavanja, kao što su RCM, TPM, održavanje prema stanju i sličnih, danas je svetski trend u usavršavanju sistema održavanja. Na primeru jednog modela taksi preduzeća, uz upotrebu metode simulacije, zasnovane na sistemskoj dinamici, izvršena je analiza efekata koje bi imalo uvođenje savremenih strategija održavanja u taj sistem. Došlo se do zaključaka koji su slični svetskim iskustvima. Najpre se mora izvršiti stabilizacija i pravilno dimenzioniranje sistema održavanja, da bi se zatim pristupilo usavršavanju sistema primenom odgovarajućih strategija. Uvođenje strategija održavanja odgovara prvenstveno sistemima kod kojih tehnička sredstva moraju neprestano da rade, odnosno imaju visok koeficijent eksploatacije. Prosečno, za svakih 10% smanjenja u broju otkaza, vremenu preventivnog održavanja i učestanosti preventivnih akcija, ukupan profit preduzeća raste oko 5%. Poboljšanja u domenu znanja održavaoca i kvaliteta rada donose narednih 5% povećanja profita. / Investments in the improvement of maintenance systems are often brought into question as to whether they are justified or not. Introducing maintenance strategies, eg. RCM, TPM, on-condition maintenance, etc., is nowadays a worldurde tendency in the improvement of maintenance systems. The simulation method based on system dynamics has been applied to a model of a taxi business in order to analyze the effects of introducing modern maintenance strategies into that system. The obtained results show good accordance with experiences wordurde. The stabilization and adequate dimensioning of the maintenance system should proceed the system improvement using adequate strategies. Bringing maintenance strategies into use predominantly suits the systems with a high duty factor, ie. the systems with continually operating elements. Every 10% of reduction in the number

  11. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  12. Weight loss maintenance: A review on dietary related strategies

    Directory of Open Access Journals (Sweden)

    Fatemeh Azizi Soeliman

    2014-01-01

    Full Text Available Background: Weight regain after weight loss is a common problem for all those obese or overweight who have had a recent weight loss. Different cures such as diet therapy, behavioral therapy, exercise or a mixture of them have been advised as solutions. The purpose of this review is to find the best diet or eating pattern to maintain a recent weight loss. Materials and Methods: We searched in PubMed and SCOPUS by using the following key words: Overweight, obesity, weight maintenance, weight regain, and diet therapy. Finally, we assessed 26 articles in the present article. Results: Meal replacement, low carbohydrate-low glycemic index (GI diet, high protein intake, and moderate fat consumption have shown some positive effects on weight maintenance. However, the results are controversial. A Dietary Approach to Stop Hypertension (DASH-type diet seems helpful for weight maintenance although the need for more study has remained. Some special behaviors were associated with less weight regain, such as, not being awake late at night, drinking lower amount of sugar-sweetened beverages, and following a healthy pattern. Some special foods have been suggested for weight maintenance. However, the roles of specific foods are not confirmed. Conclusion: Healthy diets recommend low carbohydrate, low GI, and moderate fat foods, but it is not clear whether they are useful in preventing weight gain. It seems that consuming fewer calories helps people to keep weight loss. Further research to find strategies in obesity management focusing on successful maintenance of weight loss is needed.

  13. Formulation of price strategies in the software sector: outsourcing of development and maintenance software product case

    Directory of Open Access Journals (Sweden)

    Antonio Cezar Bornia

    2008-07-01

    Full Text Available The main goal of this article is to discuss the formulation of price strategies in the software sector. In the intention of reaching the proposed goal, strategies models of prices are introduced along with the procedure to the formulation of price strategies, composed by five stages: external and internal analyses, consolidation, positioning, price strategy formalization and market attendance. As for the methodology, the study is classified as qualitative, exploratory, descriptive, documental, of field and case study, according to the approach of Vergara (1998. In the case study, the model to the formulation of price strategies is applied in a company’s software sector, being analyzed the outsourcing of development and maintenance software product. As main contributions, it is highlighted the price procedure application that emphasizes strategic price logic and prices strategies formulations, with base in the analysis of five main factors: quality, comparison with the competition, company life cycle, product life cycle and characteristics of the segment-objective. Based on the analyzed factors, a possible strategy to be adopted considering the characteristics of the product and the company is the price strategy and superior value. Key-words: Pricing Strategies. Price Formulation. Software Enterprises.

  14. A model for determining condition-based maintenance policies for deteriorating multi-component systems

    NARCIS (Netherlands)

    Hontelez, J.A.M.; Wijnmalen, D.J.D.

    1993-01-01

    We discuss a method to determine strategies for preventive maintenance of systems consisting of gradually deteriorating components. A model has been developed to compute not only the range of conditions inducing a repair action, but also inspection moments based on the last known condition value so

  15. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  16. Probability-based assessment and maintenance of welded joints damaged by fatigue

    International Nuclear Information System (INIS)

    Cremona, C.; Lukic, M.

    1998-01-01

    This paper presents a probabilistic reliability assessment procedure for steel components damaged by fatigue. The study combines the structural reliability theory with a maintenance strategy. The fatigue assessment model is based on a modelisation of the fatigue phenomenon issued from the principles of fracture mechanics theory. The safety margin includes the crack growth propagation and allows to treat fatigue damage in a general manner. Damaging cycles and non damaging cycles are distinguished. The sensitivity study of the different parameters shows that some variables can be taken as deterministic. Applications are made on a welded joint 'stiffener/bottom-plate' of a typical steel bridge. The model is then used for taking into account inspection results. Non destructive inspection (NDI) techniques are also used for updating failure probabilities. The results show their ability to be inserted in a maintenance strategy for optimizing the next inspection time. This has led to define cost functions related to the total maintenance cost; this cost is then minimized for determining the optimal next inspection time. An example of welded joint cracked by fatigue highlights the different concepts. The approach presented in the paper is not only restrained to fatigue problems, but can be applied to a wide variety of degrading phenomena. (orig.)

  17. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    Korea Hydro and Nuclear Power Company has lunched the development of a database system for PSA and Maintenance Rule implementation. It focuses on the easy processing of raw data into a credible and useful database for the risk-informed environment of nuclear power plant operation and maintenance. Even though KHNP had recently completed the PSA for all domestic NPPs as a requirement of the severe accident mitigation strategy, the component failure data were only gathered as a means of quantification purposes for the relevant project. So, the data were not efficient enough for the Living PSA or other generic purposes. Another reason to build a real time database is for the newly adopted Maintenance Rule, which requests the utility to continuously monitor the plant risk based on its operation and maintenance performance. Furthermore, as one of the pre-condition for the Risk Informed Regulation and Application, the nuclear regulatory agency of Korea requests the development and management of domestic database system. KHNP is stacking up data of operation and maintenance on the Enterprise Resource Planning (ERP) system since its first opening on July, 2003. But, so far a systematic review has not been performed to apply the component failure and maintenance history for PSA and other reliability analysis. The data stored in PUMAS before the ERP system is introduced also need to be converted and managed into the new database structure and methodology. This reliability database system is a web-based interface on a UNIX server with Oracle relational database. It is designed to be applicable for all domestic NPPs with a common database structure and the web interfaces, therefore additional program development would not be necessary for data acquisition and processing in the near future. Categorization standards for systems and components have been implemented to analyze all domestic NPPs. For example, SysCode (for a system code) and CpCode (for a component code) were newly

  18. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  19. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    Directory of Open Access Journals (Sweden)

    G. Waeyenbergh

    2012-01-01

    Full Text Available Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised maintenance concept. After describing the general framework and its decision support use, some case experiences are given. This experience covers some elements of the proposed framework.

  20. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  1. On risk-based operation and maintenance of offshore wind turbine components

    International Nuclear Information System (INIS)

    Jessen Nielsen, Jannie; Dalsgaard Sorensen, John

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

  2. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  3. Discounted cost model for condition-based maintenance optimization

    International Nuclear Information System (INIS)

    Weide, J.A.M. van der; Pandey, M.D.; Noortwijk, J.M. van

    2010-01-01

    This paper presents methods to evaluate the reliability and optimize the maintenance of engineering systems that are damaged by shocks or transients arriving randomly in time and overall degradation is modeled as a cumulative stochastic point process. The paper presents a conceptually clear and comprehensive derivation of formulas for computing the discounted cost associated with a maintenance policy combining both condition-based and age-based criteria for preventive maintenance. The proposed discounted cost model provides a more realistic basis for optimizing the maintenance policies than those based on the asymptotic, non-discounted cost rate criterion.

  4. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  5. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  6. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    Science.gov (United States)

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  7. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    OpenAIRE

    Bo Sun; Qiang Feng; Songjie Li

    2012-01-01

    According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules) based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negoti...

  8. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    Directory of Open Access Journals (Sweden)

    Bo Sun

    2012-01-01

    Full Text Available According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negotiation and independent negotiation is established, and the heuristic rules applied to global and local maintenance decision making is proposed. Based on Contract Net Protocol and the heuristic rules, the maintenance decision making algorithm is put forward. Finally, a fleet consisting of 10 aircrafts on a 3-wave continuous mission is illustrated to verify this method. Simulation results indicate that this method can improve the availability of the fleet, meet mission demands, rationalize the utilization of support resources and provide support for online maintenance decision making among a mission oriented fleet.

  9. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  10. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    International Nuclear Information System (INIS)

    Rolet, S.

    2010-01-01

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  11. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    Science.gov (United States)

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  12. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  13. Knowledge-based machine indexing from natural language text: Knowledge base design, development, and maintenance

    Science.gov (United States)

    Genuardi, Michael T.

    1993-01-01

    One strategy for machine-aided indexing (MAI) is to provide a concept-level analysis of the textual elements of documents or document abstracts. In such systems, natural-language phrases are analyzed in order to identify and classify concepts related to a particular subject domain. The overall performance of these MAI systems is largely dependent on the quality and comprehensiveness of their knowledge bases. These knowledge bases function to (1) define the relations between a controlled indexing vocabulary and natural language expressions; (2) provide a simple mechanism for disambiguation and the determination of relevancy; and (3) allow the extension of concept-hierarchical structure to all elements of the knowledge file. After a brief description of the NASA Machine-Aided Indexing system, concerns related to the development and maintenance of MAI knowledge bases are discussed. Particular emphasis is given to statistically-based text analysis tools designed to aid the knowledge base developer. One such tool, the Knowledge Base Building (KBB) program, presents the domain expert with a well-filtered list of synonyms and conceptually-related phrases for each thesaurus concept. Another tool, the Knowledge Base Maintenance (KBM) program, functions to identify areas of the knowledge base affected by changes in the conceptual domain (for example, the addition of a new thesaurus term). An alternate use of the KBM as an aid in thesaurus construction is also discussed.

  14. Fault Diagnosis approach based on a model-based reasoner and a functional designer for a wind turbine. An approach towards self-maintenance

    Science.gov (United States)

    Echavarria, E.; Tomiyama, T.; van Bussel, G. J. W.

    2007-07-01

    The objective of this on-going research is to develop a design methodology to increase the availability for offshore wind farms, by means of an intelligent maintenance system capable of responding to faults by reconfiguring the system or subsystems, without increasing service visits, complexity, or costs. The idea is to make use of the existing functional redundancies within the system and sub-systems to keep the wind turbine operational, even at a reduced capacity if necessary. Re-configuration is intended to be a built-in capability to be used as a repair strategy, based on these existing functionalities provided by the components. The possible solutions can range from using information from adjacent wind turbines, such as wind speed and direction, to setting up different operational modes, for instance re-wiring, re-connecting, changing parameters or control strategy. The methodology described in this paper is based on qualitative physics and consists of a fault diagnosis system based on a model-based reasoner (MBR), and on a functional redundancy designer (FRD). Both design tools make use of a function-behaviour-state (FBS) model. A design methodology based on the re-configuration concept to achieve self-maintained wind turbines is an interesting and promising approach to reduce stoppage rate, failure events, maintenance visits, and to maintain energy output possibly at reduced rate until the next scheduled maintenance.

  15. Fault Diagnosis approach based on a model-based reasoner and a functional designer for a wind turbine. An approach towards self-maintenance

    International Nuclear Information System (INIS)

    Echavarria, E; Tomiyama, T; Bussel, G J W van

    2007-01-01

    The objective of this on-going research is to develop a design methodology to increase the availability for offshore wind farms, by means of an intelligent maintenance system capable of responding to faults by reconfiguring the system or subsystems, without increasing service visits, complexity, or costs. The idea is to make use of the existing functional redundancies within the system and sub-systems to keep the wind turbine operational, even at a reduced capacity if necessary. Re-configuration is intended to be a built-in capability to be used as a repair strategy, based on these existing functionalities provided by the components. The possible solutions can range from using information from adjacent wind turbines, such as wind speed and direction, to setting up different operational modes, for instance re-wiring, re-connecting, changing parameters or control strategy. The methodology described in this paper is based on qualitative physics and consists of a fault diagnosis system based on a model-based reasoner (MBR), and on a functional redundancy designer (FRD). Both design tools make use of a function-behaviour-state (FBS) model. A design methodology based on the re-configuration concept to achieve self-maintained wind turbines is an interesting and promising approach to reduce stoppage rate, failure events, maintenance visits, and to maintain energy output possibly at reduced rate until the next scheduled maintenance

  16. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  17. The Effects of Relationship Type, Partner Intent, and Gender on the Selection of Relationship Maintenance Strategies.

    Science.gov (United States)

    Shea, B. Christine; Pearson, Judy C.

    1986-01-01

    Indicates that relationship type did not affect the maintenance strategies that partners chose; however, the partners' relationship intent and the sex-composition of the dyad had a significant impact on the selection of directness strategies. Suggests that individuals are not necessarily more likely to select directness strategies than balance or…

  18. An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics

    Directory of Open Access Journals (Sweden)

    Mahmood Shafiee

    2013-01-01

    Full Text Available In offshore wind turbines, the blades are among the most critical and expensive components that suffer from different types of damage due to the harsh maritime environment and high load. The blade damages can be categorized into two types: the minor damage, which only causes a loss in wind capture without resulting in any turbine stoppage, and the major (catastrophic damage, which stops the wind turbine and can only be corrected by replacement. In this paper, we propose an optimal number-dependent preventive maintenance (NDPM strategy, in which a maintenance team is transported with an ordinary or expedited lead time to the offshore platform at the occurrence of the Nth minor damage or the first major damage, whichever comes first. The long-run expected cost of the maintenance strategy is derived, and the necessary conditions for an optimal solution are obtained. Finally, the proposed model is tested on real data collected from an offshore wind farm database. Also, a sensitivity analysis is conducted in order to evaluate the effect of changes in the model parameters on the optimal solution.

  19. A condition-based maintenance of a dependent degradation-threshold-shock model in a system with multiple degradation processes

    International Nuclear Information System (INIS)

    Caballé, N.C.; Castro, I.T.; Pérez, C.J.; Lanza-Gutiérrez, J.M.

    2015-01-01

    This paper proposes a condition-based maintenance strategy for a system subject to two dependent causes of failure: degradation and sudden shocks. The internal degradation is reflected by the presence of multiple degradation processes in the system. Degradation processes start at random times following a Non-homogeneous Poisson process and their growths are modelled by using a gamma process. When the deterioration level of a degradation process exceeds a predetermined value, we assume that a degradation failure occurs. Furthermore, the system is subject to sudden shocks that arrive at the system following a Doubly Stochastic Poisson Process. A sudden shock provokes the total breakdown of the system. Thus, the state of the system is evaluated at inspection times and different maintenance tasks can be carried out. If the system is still working at an inspection time, a preventive maintenance task is performed if the deterioration level of a degradation process exceeds a certain threshold. A corrective maintenance task is performed if the system is down at an inspection time. A preventive (corrective) maintenance task implies the replacement of the system by a new one. Under this maintenance strategy, the expected cost rate function is obtained. A numerical example illustrates the analytical results. - Highlights: • A condition-based maintenance model is proposed. • Two dependent causes of failure are considered: deterioration and external shocks. • Deterioration is given by multiple degradation processes growing by a gamma process. • The initiation of degradation processes follows a Non-homogeneous Poisson process. • External shocks arrive at the system by using a Doubly Stochastic Poisson Process

  20. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  1. Applying reliability centered maintenance analysis principles to inservice testing

    International Nuclear Information System (INIS)

    Flude, J.W.

    1994-01-01

    Federal regulations require nuclear power plants to use inservice test (IST) programs to ensure the operability of safety-related equipment. IST programs are based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. Many of these plants also use Reliability Centered Maintenance (RCM) to optimize system maintenance. ASME Code requirements are hard to change. The process for requesting authority to use an alternate strategy is long and expensive. The difficulties of obtaining this authority make the use of RCM method on safety-related systems not cost effective. An ASME research task force on Risk Based Inservice Testing is investigating changing the Code. The change will allow plants to apply RCM methods to the problem of maintenance strategy selection for safety-related systems. The research task force is working closely with the Codes and Standards sections to develop a process related to the RCM process. Some day plants will be able to use this process to develop more efficient and safer maintenance strategies

  2. Economic evaluation of maintenance strategies for steam generator tubes using probabilistic fracture mechanics and financial method

    International Nuclear Information System (INIS)

    Sagisaka, Mitsuyuki; Isobe, Yoshihiro; Yoshimura, Shinobu; Yagawa, Genki

    2004-01-01

    As an application of probabilistic fracture mechanics (PFM) and a financial method, risk-benefit analyses were performed for the purpose of optimizing maintenance activities of steam generator (SG) tubes used in pressurized water reactors (PWRs). Parameters such as in-service inspection (ISI) detection accuracy, ISI interval, sampling inspection, replacement of SGs and stress corrosion cracking (SCC) allowance operation were selected for sensitivity analyses. In the analysis of the operation introducing maintenance criteria, the effect of quantitative accuracy of the inspection was also taken into account. Although the analyses were mainly conducted for SG tubes made of Inconel 600 mill anneal (MA) materials, the analyses were also performed for SCC-resistant materials with making assumptions on their crack initiation probabilities and crack propagation laws. To justify whether or not it is worth while implementing the selected maintenance strategies in terms of an economic point of view, net present value (NPV) was calculated as an index which is one of the most fundamental financial indices for decision-making based on the discounted cash flow (DCF) method. (author)

  3. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  4. Latent human error analysis and efficient improvement strategies by fuzzy TOPSIS in aviation maintenance tasks.

    Science.gov (United States)

    Chiu, Ming-Chuan; Hsieh, Min-Chih

    2016-05-01

    The purposes of this study were to develop a latent human error analysis process, to explore the factors of latent human error in aviation maintenance tasks, and to provide an efficient improvement strategy for addressing those errors. First, we used HFACS and RCA to define the error factors related to aviation maintenance tasks. Fuzzy TOPSIS with four criteria was applied to evaluate the error factors. Results show that 1) adverse physiological states, 2) physical/mental limitations, and 3) coordination, communication, and planning are the factors related to airline maintenance tasks that could be addressed easily and efficiently. This research establishes a new analytic process for investigating latent human error and provides a strategy for analyzing human error using fuzzy TOPSIS. Our analysis process complements shortages in existing methodologies by incorporating improvement efficiency, and it enhances the depth and broadness of human error analysis methodology. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  5. Implementation strategies and tools for condition based monitoring at nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    There is now an acute need to optimize maintenance to improve both reliability and competitiveness of nuclear power plant operation. There is an increasing tendency to move from the preventive (time based) maintenance concept to one dependent on plant and component conditions. In this context, various on-line and off-line condition monitoring and diagnostics, nondestructive inspection techniques and surveillance are used. Component selection for condition based maintenance, parameter selection for monitoring condition, evaluation of condition monitoring results are issues influencing the effectiveness of condition based maintenance. All these selections of components and parameters to be monitored, monitoring and diagnostics techniques to be used, acceptance criteria and trending for condition evaluation, and the economic aspect of predictive maintenance and condition monitoring should be incorporated into an integrated, effective condition based maintenance programme, which is part of the plant's overall maintenance optimization programme. This publication collects and analyses proven condition based maintenance strategies and techniques (engineering and organizational) in Member States. It includes selected papers on maintenance optimization presented during its preparation. This report was prepared under IAEA project on integrated NPP life cycle management including decommissioning. The main objective of an integrated life cycle management programme is to enable NPP's to compete, without compromising safety, successfully in the changing energy markets throughout their service life and to facilitate life extension and eventual decommissioning through improved engineering, technological, economic and managerial actions. The technical working group on NPP life management and other advisory groups nominated by the Member States provide recommendations on high priority needs of Member States in this area

  6. A new pulmonary rehabilitation maintenance strategy through home-visiting and phone contact in COPD

    Directory of Open Access Journals (Sweden)

    Li Y

    2018-01-01

    Full Text Available Yi Li,1,2 Jing Feng,3,4 Yuechuan Li,2 Wei Jia,2 Hongyu Qian2 1Graduate School, Tianjin Medical University, 2Department of Respiratory and Critical Care Medicine, Tianjin Chest Hospital, 3Respiratory Department, Tianjin Medical University General Hospital, Tianjin, People’s Republic of China; 4Neuropharmacology Section, Laboratory of Toxicology and Pharmacology, National Institute of Environmental Health Sciences, National Institutes of Health, Research Triangle Park, NC, USA Background: The benefit of pulmonary rehabilitation (PR for patients with COPD diminishes over time. We investigated a new strategy involving home-visit and phone contact and compared this to usual care in maintenance of PR benefits.Methods: A total of 172 stable COPD patients receiving 8-week PR program were recruited for this prospective study. Patients were allocated into usual care group (UC and PR maintenance group (PRMG randomly. Patients in PRMG participated in maintenance strategy at home under supervision through home-visit and phone contact. The 6-minute walking test (6MWT, COPD assessment test (CAT, and modified Medical Research Council scale (mMRC scores were evaluated every 3 months.Results: Of the total, 151 patients completed 8-week PR program with satisfactory PR results (p<0.001, and 104 patients finished the follow-up. The clinical improvements in 6MWT, CAT, and mMRC scores were maintained (p<0.001 in PRMG. In comparison, the benefit of PR diminished gradually in UC. The differences in 6MWT, CAT, and mMRC scores between groups were observed 6, 9, and 6 months after PR, respectively (p<0.05. Total frequency of exacerbations in PRMG was lower than UC (p=0.021.Conclusion: Maintenance strategy involving home-visit and phone contact is superior to usual care to preserve PR benefits, and reduces the acute COPD exacerbation rate. Keywords: COPD, pulmonary rehabilitation, 6-minute walking test, COPD assessment test, maintenance 

  7. Model-based fault diagnosis framework for effective predictive maintenance / B.B. Akindele

    OpenAIRE

    Akindele, Babatunde Babajide

    2010-01-01

    Predictive maintenance is a proactive maintenance strategy that is aimed at preventing the unexpected failure of equipment through condition monitoring of the health and performance of the equipment. Incessant equipment outage resulting in low availability of production facilities is a major issue in the Nigerian manufacturing environment. Improving equipment availability in Nigeria industry through institution of a full featured predictive maintenance has been suggested by many authors. T...

  8. International expansion, market maintenance strategy used by French Winemaking Industry

    Directory of Open Access Journals (Sweden)

    Oana BĂRBULESCU

    2016-07-01

    Full Text Available Starting from the theoretical concepts that define the maintenance strategies for the international market, this paper presents the results of a quantitative research survey conducted among Romanian consumers of wine. What is aimed at is to know their attitudes and opinions referring to wine imports in order to identify a strategy for the entrance on the Romanian market of the French wine producer Louis Latour, which is imposed by the need to maintain sales in the context of demand shrinking on the home market. The conclusion of the quantitative research conducted on a sample of 402 people from all country regions reveals the opportunity of entering the Romanian market by using indirect export as a way of entering the market.

  9. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  10. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  11. A genetic algorithm solution for a nuclear power plant risk-cost maintenance model

    International Nuclear Information System (INIS)

    Tong Jiejuan; Mao Dingyuan; Xue Dazhi

    2004-01-01

    Reliability Centered Maintenance (RCM) is one of the popular maintenance optimization methods according to certain kinds of priorities. Traditional RCM usually analyzes and optimizes the maintenance strategy from the viewpoint of component instead of the whole maintenance program impact. Research presented in this paper is a pilot study using PSA techniques in RCM. How to reflect the effect on component unavailability by the maintenance activities such as surveillance testing and preventive maintenance in PSA model is discussed firstly. Based on the discussion, a maintenance risk-cost model is established for global maintenance optimization in a nuclear power plant, and a genetic algorithm (GA) is applied to solve such a model to get the global optimized maintenance strategy. Finally, the result got from a simple test case based on a risk-cost model consisting of 10 components is presented

  12. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    OpenAIRE

    M. A., Burhanuddin; Halawani, Sami M.; Ahmad, A. R.

    2011-01-01

    Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it c...

  13. Application of condition based maintenance to nuclear power plants

    International Nuclear Information System (INIS)

    Sonoda, Yukio; Nakano, Tomohito; Shimizu, Shunichi; Iida, Jun; Atomura, Masakazu; Abe, Masahiro

    2002-01-01

    Device Karte management system which supports application of condition based maintenance to nuclear power plants has been developed. The purpose of this system is to support maintenance personnel in device inspection scheduling based on operating condition monitoring and maintenance histories. There are four functions: field database, degradation estimation, inspection time decision and maintenance planning. The authors have been applying this system to dozens of devices of Onagawa Nuclear Power Station Unit No. 1 for one year. This paper represents the system concept and its application experiences. (author)

  14. A proposed maintenance strategy for generator sets utilised in biogas applications

    OpenAIRE

    2012-01-01

    M. Ing. The overall purpose of this research project was to develop a proposed maintenance strategy for generator sets utilised in biogas applications. One specific biogas application, involving the use of landfill gas (LFG) to generate electrical energy, was the focal point of the research project. This is due to the fact that the author’s organisation is extensively involved with landfills and power generation through the use of LFG.

  15. Maintenance strategies and safety on a deregulated market. Mapping of changes in maintenance strategies and their possible consequences; Underhaallsstrategier och saekerhet paa en avreglerad elmarknad. En kartlaeggning av foeraendrade underhaallsstrategier och dess moejliga konsekvenser

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, Lena [MTO Psykologi AB, Huddinge (Sweden)

    2004-11-01

    of the interviewed. The results indicate, in accordance with other research results, that rationalisations and changes must be combined with work development and the participation of the employees to be successful. Outsourcing has been used for some activities. All the companies have established a joint maintenance department for their units. The companies have been moving towards lean organization which has increased the work load of the staff. Therefore more planning is required to get a optimal resource allocation, to avoid problems at work peaks. All the plants have abandoned a downright customer-supplier relation for the benefit of one competent maintenance supplier with a comprehensive view. As a result the contractual undertaking of the maintenance department towards the production units is made on a long term basis. The new maintenance strategy is based on status controls for condition based maintenance and on riskbased analysing methods. There are modern computer-based maintenance systems at all the plants. Computer-based instruments are used direct in the production line where they require a competence shift in the staff. Positive effects that appeared in the interviews are better possibilities for experience feed back and methods development, access to a wider and larger competence and a joint working method. The results show that there are already some positive effects and there are more to be expected. But it is also clear that these effects have neither come as easily nor as fast as was expected. Possible negative effects: there is a risk that the staffing might be too scarce, especially in work peaks, e.g. unexpected shutdowns. A high work load and much overtime work mean greater strain on the staff. Problems with job satisfaction and motivation, chiefly after the change to a matrix organisation. Uncertainties as to responsibility and roles in the new organisation. The practical competence might 'disappear' in the present competence shift

  16. Virtual maintenance technology for reactor system based on PPR technology

    International Nuclear Information System (INIS)

    Wu Yaxiang; Ma Baiyong

    2009-01-01

    Based on the Product, Process and Resources (PPR) technology, the establishing technology of virtual maintenance environment for the reactor system and the process structure tree for virtual maintenance is studied, and the flow for the maintainability design and simulation for reactor system is put forward. Based on the subsection simulation of maintenance process and layered design of maintenance actions, the leveled structure of the reactor system virtual maintenance task is studied. The relation for the data of product, process and resource is described by Plan Evaluation and Review Technology (PERT) diagram to define the maintenance operation. (authors)

  17. The study of the maintenance for a cryogenics pilot plant in nuclear regime

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2002-01-01

    The Cryogenic Pilot Plant, CPP, has as goal the extraction of tritium from heavy water at the CANDU Reactors in Cernavoda. Its operation allows a continuos nuclear regime. CPP consists in several modules, each of them implying static and dynamical complex equipment in which fluids circulate at cryogenic temperatures. From these reasons it results that the CPP maintenance is essential. The relational structure regarding the integrated maintenance systems in the whole ICSI's activity is presented in the frame of management decision system and contains a procedural program of maintenance (PPM). PPM includes adoption strategy for maintenance activity in the conditions required by the Manuals worked out in compliance with QA of ICSI and specific regulations of operation in nuclear regime. An explanation based on a thorough analysis is given for the strategy of maintenance, the structure of modules and the use of informatics subsystems. The structure of PPM strategy has a flowchart implying: - Reorganization, Scientific background, and Operative Maintenance strategy (inside/outside strategy) as well as PPM stage realization and specifications for maintenance assurance (manuals, cards and subsystems). Also, provided in the maintenance strategy are the PPM preparatory and proper stage conceptions

  18. Redundancy Maintenance and Garbage Collection Strategies in Peer-to-Peer Storage Systems

    Science.gov (United States)

    Liu, Xin; Datta, Anwitaman

    Maintaining redundancy in P2P storage systems is essential for reliability guarantees. Numerous P2P storage system maintenance algorithms have been proposed in the last years, each supposedly improving upon the previous approaches. We perform a systematic comparative study of the various strategies taking also into account the influence of different garbage collection mechanisms, an issue not studied so far. Our experiments show that while some strategies generally perform better than some others, there is no universally best strategy, and their relative superiority depends on various other design choices as well as the specific evaluation criterion. Our results can be used by P2P storage systems designers to make prudent design decisions, and our exploration of the various evaluation metrics also provides a more comprehensive framework to compare algorithms for P2P storage systems. While there are numerous network simulators specifically developed even to simulate peer-to-peer networks, there existed no P2P storage simulators - a byproduct of this work is a generic modular P2P storage system simulator which we provide as open-source. Different redundancy, maintenance, placement, garbage-collection policies, churn scenarios can be easily integrated to the simulator to try out new schemes in future, and provides a common framework to compare (future) p2p storage systems designs - something which has not been possible so far.

  19. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  20. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  1. Maintenance scheduling of a manufacturing system subject to deterioration

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Newby, Martin

    2011-01-01

    This paper presents an integrated model for the joint determination of both optimal inspection strategy and optimal repair policy for a manufacturing system whose resulting output is subject to system state. An appropriate maintenance strategy is essential to optimize revenue from a manufacturing system which is in continuous operation and subject to deterioration. The optimum policy balances the amount of maintenance required to increase availability against the loss of revenue arising from the down time: insufficient maintenance leads to an increase in the number of defective items, low profit and low maintenance cost; excessive maintenance results in a reduction in the proportion of defective items, high profit and high maintenance cost. In this paper, an intensity control model adapted to partial information provides an optimal inspection intensity and repair degree of the system as an optimal control process to yield maximum revenue. The solution is obtained through formulating an equivalent deterministic Hamilton-Jacobi equation. A numerical example is provided to illustrate the behavior of the optimal control process. The optimal control process determines a solution to both optimum inspection frequency and optimal replacement policy which results in an optimal production run length of the system. - Highlights: → We develop an optimum asset management strategy based on the revenue generated by the asset. → The optimum strategy controls the intensity, rate of occurrence, of interruptions to service. → The decisions are based on partial observation of the system and do not need perfect information. There is no need for continuous monitoring of the system.

  2. Regulatory requirements related to risk-based inspection and maintenance

    International Nuclear Information System (INIS)

    Schroeder, H.C.; Kauer, R.

    2003-01-01

    By asking the question why new inspection and maintenance strategies have to be developed one can often be made aware that there is always a continue demand for cost reduction and optimisation. In this framework, general trends involving staff reduction, outsourcing, benchmarking etc. can often be observed nearly everywhere. Since inspection and maintenance are amongst the few cost factors, which could be actively influenced in the short term, and in combination with the recent regulatory fundamental changes (e.g. PED) yielding to considerably greater responsibilities for the operator of a plant, also the demand for documentation and comprehensibility of measures will increase. (orig.)

  3. Influencing factors for condition-based maintenance in railway tracks using knowledge-based approach

    NARCIS (Netherlands)

    Jamshidi, A.; Hajizadeh, S.; Naeimi, M.; Nunez Vicencio, Alfredo; Li, Z.

    2017-01-01

    In this paper, we present a condition-based maintenance decision method using
    knowledge-based approach for rail surface defects. A railway track may contain a considerable number of surface defects which influence track maintenance decisions. The proposed method is based on two sets of

  4. A Bayesian network based approach for integration of condition-based maintenance in strategic offshore wind farm O&M simulation models

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard; Sperstad, Iver Bakken

    2018-01-01

    In the overall decision problem regarding optimization of operation and maintenance (O&M) for offshore wind farms, there are many approaches for solving parts of the overall decision problem. Simulation-based strategy models accurately capture system effects related to logistics, but model...... to generate failures and CBM tasks. An example considering CBM for wind turbine blades demonstrates the feasibility of the approach....

  5. Future-oriented maintenance strategy based on automated processes is finding its way into large astronomical facilities at remote observing sites

    Science.gov (United States)

    Silber, Armin; Gonzalez, Christian; Pino, Francisco; Escarate, Patricio; Gairing, Stefan

    2014-08-01

    With expanding sizes and increasing complexity of large astronomical observatories on remote observing sites, the call for an efficient and recourses saving maintenance concept becomes louder. The increasing number of subsystems on telescopes and instruments forces large observatories, like in industries, to rethink conventional maintenance strategies for reaching this demanding goal. The implementation of full-, or semi-automatic processes for standard service activities can help to keep the number of operating staff on an efficient level and to reduce significantly the consumption of valuable consumables or equipment. In this contribution we will demonstrate on the example of the 80 Cryogenic subsystems of the ALMA Front End instrument, how an implemented automatic service process increases the availability of spare parts and Line Replaceable Units. Furthermore how valuable staff recourses can be freed from continuous repetitive maintenance activities, to allow focusing more on system diagnostic tasks, troubleshooting and the interchanging of line replaceable units. The required service activities are decoupled from the day-to-day work, eliminating dependencies on workload peaks or logistic constrains. The automatic refurbishing processes running in parallel to the operational tasks with constant quality and without compromising the performance of the serviced system components. Consequentially that results in an efficiency increase, less down time and keeps the observing schedule on track. Automatic service processes in combination with proactive maintenance concepts are providing the necessary flexibility for the complex operational work structures of large observatories. The gained planning flexibility is allowing an optimization of operational procedures and sequences by considering the required cost efficiency.

  6. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2009-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  7. How additive manufacturing enables more sustainable end-user maintenance, repair and overhaul (MRO) strategies

    NARCIS (Netherlands)

    Wits, Wessel Willems; Reyes Garcia, José Roberto; Jauregui Becker, Juan Manuel

    2016-01-01

    This paper projects how Maintenance, Repair and Overhaul (MRO) strategies can be optimized to the specific needs of end-users using Additive Manufacturing (AM) technologies. AM can significantly reduce the design and production times for customized parts. This leads to key advantages for MRO

  8. Development of a methodology for maintenance optimization at Kozloduy NPP

    International Nuclear Information System (INIS)

    Kitchev, E.

    1997-01-01

    The paper presents the overview of a project for development of an applicable strategy and methods for Kozloduy NPP (KNPP) to optimize its maintenance program in order to meet the current risk based maintenance requirements. The strategy in a format of Integrated Maintenance Program (IMP) manual will define the targets of the optimization process, the major stages and elements of this process and their relationships. IMP embodies the aspects of the US NRC Maintenance Rule compliance and facilitates the integration of KNPP programs and processes which impact the plant maintenance and safety. The methods in a format of IMP Instructions (IM-PI) will define how the different IMP stages can be implemented and the IMP targets can be achieved at KNPP environment. (author). 8 refs

  9. Forming a cohesive steam generator maintenance strategy

    International Nuclear Information System (INIS)

    Poudroux, G.

    1991-01-01

    In older nuclear plants, steam generator tube bundles are the most fragile part of the reactor coolant system. Steam generator tubes are subject to numerous types of loading, which can lead to severe degradation (corrosion and wear phenomena). Preventive actions, such as reactor coolant temperature reduction or increasing the plugging limit and their associated analyses, can increase steam generator service life. Beyond these preventive actions, the number of affected tubes and the different locations of the degradations that occur often make repair campaigns necessary. Framatome has developed and qualified a wide range of treatment and repair processes. They enable careful management of the repair campaigns, to avoid reaching the maximum steam generator tube plugging limit, while optimizing the costs. Most of the available repair techniques allow a large number of affected tubes to be treated. Here we look only at those techniques that should be taken into account when defining a maintenance strategy. (author)

  10. Maintenance Decision Making based on different types of data fusion

    OpenAIRE

    Galar, D.; Gustafson, A.; Tormos Martínez, Bernardo Vicente; Berges, Luis

    2012-01-01

    [EN] Over the last decade, system integration is applied more as it allows organizations to streamline business processes. A recent development in the asset engineering management is to leverage the investment already made in process control systems. This allows the operations, maintenance, and process control teams to monitor and determine new alarm level based on the physical condition data of the critical machines. Condition-based maintenance (CBM) is a maintenance philosophy base...

  11. The health maintenance organization strategy: a corporate takeover of health services delivery.

    Science.gov (United States)

    Salmon, J W

    1975-01-01

    This paper presents a political economic framework for viewing the social organization of the delivery of health care servies and predicting a qualitatively different institutional configuration involving the health maintenance organization. The principal forces impacting American capitalism today are leading to a fundamental restructuring for increased social efficiency of the entire social welfare sector, including the health services industry. The method to achieve this restructuring involves health policy directed at raising the contribution to the social surplus from the delivery of health care services and eventual corporate domination. The health maintenance organization conceptualization is examined with suggestions as to how the HMO strategy promoted by the state leads to this corporate takeover. The mechanism and extent of the present corporate involvement are examined and implications of health services as a social control mechanism are presented.

  12. Optimizing block-based maintenance under random machine usage

    NARCIS (Netherlands)

    de Jonge, Bram; Jakobsons, Edgars

    Existing studies on maintenance optimization generally assume that machines are either used continuously, or that times until failure do not depend on the actual usage. In practice, however, these assumptions are often not realistic. In this paper, we consider block-based maintenance optimization

  13. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  14. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  15. SYSTMS: Systematic approach for the development of strategies for maintenance and surveillance

    International Nuclear Information System (INIS)

    Yang, J.X.; McCrea, L.; Dam, R.F.; Nickerson, J.H.

    2004-01-01

    As part of AECL's Integrated PLiM program, the SYSTMS TM tool has been developed to assist in applying the Systematic Assessment of Maintenance (SAM) technology. SYSTMS builds upon AECL's experience in this area, capturing lessons learned to result in an efficient and effective assessment of system maintenance in NPPs. An important feature of SYSTMS is that it provides analysts with needed information that is easy to review and select for inclusion in the system maintenance assessment. This is accomplished through the use of maintenance templates which can be built and tracked using SYSTMS or imported from AECL's own Maintenance Template Database. This database was developed originally to capture information gathered in SAM studies for use in future studies. It has grown to become a central tool for organizing and integrating aging related knowledge from both within AECL and from outside resources. The SYSTMS tool and the Maintenance Template Database work together to provide an effective tool for performing SAM assessments. This combination also becomes an integral part of the Asset Management program development and System based Adaptive Maintenance Program applications. This paper looks at the features of the SYSTMS tool and Maintenance Database, and discusses how these tools are an important part of the AECL Integrated PLiM products and services. (author)

  16. The-Abstraction-Hierarchy-based Mobile PC Display Design for NPP Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Kim, Bo Gyung; Seong, Poong Hyun; Ha, Jun Su

    2010-01-01

    Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on abstraction hierarchy (AH) is proposed and its design considerations are discussed in this study. Six levels of abstraction hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using AH, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, AH-based MMA is designed for the maintenance tasks. An experiment is conducted using the AH-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that an AH-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the AH-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, AH-model applied MMAs can be used as an effective maintenance supporting tool

  17. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  18. Prognostics and Condition-Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2004-01-01

    The assumptions used in the design basis of process equipment have always been as much art as science. The usually imprecise boundaries of the equipments' operational envelope provide opportunities for two major improvements in the operations and maintenance (O and M) of process machinery: (a) the actual versus intended machine environment can be understood and brought into much better alignment and (b) the end goal can define O and M strategies in terms of life cycle and economic management of plant assets.Scientists at the Pacific Northwest National Laboratory (PNNL) have performed experiments aimed at understanding and controlling aging of both safety-specific nuclear plant components and the infrastructure that supports essential plant processes. In this paper we examine the development of aging precursor metrics and their correlation with degradation rate and projected machinery failure.Degradation-specific correlations have been developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition-based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest and formulating a deterministic relationship between the stressor intensity and the resulting degradation rate. This precursive relationship between the performance, degradation, and underlying stressor set is used to gain a first-principles approach to prognostic determinations. A holistic infrastructure approach, as applied through a conditions-based maintenance framework, will allow intelligent, automated diagnostic and prognostic programming to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  19. Preventive Maintenance Optimization in Healthcare Domain: Status of Research and Perspective

    OpenAIRE

    Mahfoud, H.; El Barkany, A.; El Biyaali, A.

    2016-01-01

    Although medical equipment maintenance has been carefully managed for years, very few in-depth studies have been conducted to evaluate the effectiveness and efficiency of these implemented preventive maintenance strategies, especially after the debate about the credibility of manufacturer’s recommendations has increased in the clinical engineering community. Facing the dilemma of merely following manufactures maintenance manual or establishing an evidence-based maintenance, medical equipment ...

  20. Development of a knowledge-based information management system for plant maintenance

    International Nuclear Information System (INIS)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin; Roh, Eun Chul; Lee, Byung Ine

    2003-01-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance

  1. Development of a knowledge-based information management system for plant maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin [Sungkyunkwan Univ., Seoul (Korea, Republic of); Roh, Eun Chul; Lee, Byung Ine [Pohang Iron and Steel Company, Pohang (Korea, Republic of)

    2003-07-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  2. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  3. A Novel Idea for Optimizing Condition-Based Maintenance Using Genetic Algorithms and Continuous Event Simulation Techniques

    Directory of Open Access Journals (Sweden)

    Mansoor Ahmed Siddiqui

    2017-01-01

    Full Text Available Effective maintenance strategies are of utmost significance for system engineering due to their direct linkage with financial aspects and safety of the plants’ operation. At a point where the state of a system, for instance, level of its deterioration, can be constantly observed, a strategy based on condition-based maintenance (CBM may be affected; wherein upkeep of the system is done progressively on the premise of monitored state of the system. In this article, a multicomponent framework is considered that is continuously kept under observation. In order to decide an optimal deterioration stage for the said system, Genetic Algorithm (GA technique has been utilized that figures out when its preventive maintenance should be carried out. The system is configured into a multiobjective problem that is aimed at optimizing the two desired objectives, namely, profitability and accessibility. For the sake of reality, a prognostic model portraying the advancements of deteriorating system has been employed that will be based on utilization of continuous event simulation techniques. In this regard, Monte Carlo (MC simulation has been shortlisted as it can take into account a wide range of probable options that can help in reducing uncertainty. The inherent benefits proffered by the said simulation technique are fully utilized to display various elements of a deteriorating system working under stressed environment. The proposed synergic model (GA and MC is considered to be more effective due to the employment of “drop-by-drop approach” that permits successful drive of the related search process with regard to the best optimal solutions.

  4. Reliability assessment of power pole infrastructure incorporating deterioration and network maintenance

    International Nuclear Information System (INIS)

    Ryan, Paraic C.; Stewart, Mark G.; Spencer, Nathan; Li, Yue

    2014-01-01

    There is considerable investment in timber utility poles worldwide, and there is a need to examine the structural reliability and probability based management optimisation of these power distribution infrastructure elements. The work presented in this paper builds on the existing studies in this area through assessment of both treated and untreated timber power poles, with the effects of deterioration and network maintenance incorporated in the analysis. This more realistic assessment approach, with deterioration and maintenance considered, was achieved using event-based Monte Carlo simulation. The output from the probabilistic model is used to illustrate the importance of considering network maintenance in the time-dependent structural reliability assessment of timber power poles. Under wind load, treated and untreated poles designed and maintained in accordance with existing Australian standards were found to have similar failure rates. However, untreated pole networks required approximately twice as many maintenance based pole replacements to sustain the same level of reliability. The effect of four different network maintenance strategies on infrastructure performance was also investigated herein. This assessment highlighted the fact that slight alterations to network maintenance practices can lead to significant changes in performance of timber power pole networks. - Highlights: • A time-dependent structural reliability model was developed for timber power poles. • Deterioration and network maintenance were incorporated into this event based model. • Network maintenance had a significant impact on power pole wind vulnerability. • Treated and untreated poles designed to Australian standards had similar reliability. • Minor alterations to maintenance strategies had large effects on network performance

  5. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  6. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  7. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... considering all available information. First, a theoretical damage model is formulated, the model is then updated using condition monitoring data, and the updated model is used as basis for risk-based decision making. Several approaches for solving the decision problems have been considered: various types...

  8. Strategies for the Management of Built Heritage Linked to Maintenance and Monitoring. Case Study of the San Roque Neighborhood, Cuenca, Ecuador

    Science.gov (United States)

    Achig-Balarezo, M. C.; Vázquez, L.; Barsallo, M. G.; Briones, J. C.; Amaya, J.

    2017-10-01

    The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003). At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  9. Availability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval

    Science.gov (United States)

    Kumar, Girish; Jain, Vipul; Gandhi, O. P.

    2018-03-01

    Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availability analysis of mechanical systems that follow condition-based maintenance (CBM) and evaluation of optimal condition monitoring interval. The developed SMP model is solved using two-stage analytical approach for steady-state availability analysis of the system. Also, CBM interval is decided for maximizing system availability using Genetic Algorithm approach. The main contribution of the paper is in the form of a predictive tool for system availability that will help in deciding the optimum CBM policy. The proposed methodology is demonstrated for a centrifugal pump.

  10. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  11. Teachers' Awareness and Usage of Non-Violent Strategies for the Maintenance of Discipline in Nigerian Secondary Schools: A Situational Analysis

    Science.gov (United States)

    Uzoechina, Gladys Oby; Oguegbu, Adaeze; Akachukwu, Esther; Nwasor, Victor Chekume

    2015-01-01

    This study sought to determine teachers' level of awareness and usage of non-violent strategies/interventions for the maintenance of discipline in secondary schools in Anambra State, Nigeria. Corporal punishment has become an unwritten sine qua non for the maintenance of school discipline--often the first thought that comes to the minds of…

  12. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  13. A novel approach for modelling complex maintenance systems using discrete event simulation

    International Nuclear Information System (INIS)

    Alrabghi, Abdullah; Tiwari, Ashutosh

    2016-01-01

    Existing approaches for modelling maintenance rely on oversimplified assumptions which prevent them from reflecting the complexity found in industrial systems. In this paper, we propose a novel approach that enables the modelling of non-identical multi-unit systems without restrictive assumptions on the number of units or their maintenance characteristics. Modelling complex interactions between maintenance strategies and their effects on assets in the system is achieved by accessing event queues in Discrete Event Simulation (DES). The approach utilises the wide success DES has achieved in manufacturing by allowing integration with models that are closely related to maintenance such as production and spare parts systems. Additional advantages of using DES include rapid modelling and visual interactive simulation. The proposed approach is demonstrated in a simulation based optimisation study of a published case. The current research is one of the first to optimise maintenance strategies simultaneously with their parameters while considering production dynamics and spare parts management. The findings of this research provide insights for non-conflicting objectives in maintenance systems. In addition, the proposed approach can be used to facilitate the simulation and optimisation of industrial maintenance systems. - Highlights: • This research is one of the first to optimise maintenance strategies simultaneously. • New insights for non-conflicting objectives in maintenance systems. • The approach can be used to optimise industrial maintenance systems.

  14. Maintenance Decision Based on Data Fusion of Aero Engines

    Directory of Open Access Journals (Sweden)

    Huawei Wang

    2013-01-01

    Full Text Available Maintenance has gained a great importance as a support function for ensuring aero engine reliability and availability. Cost-effectiveness and risk control are two basic criteria for accurate maintenance. Given that aero engines have much condition monitoring data, this paper presents a new condition-based maintenance decision system that employs data fusion for improving accuracy of reliability evaluation. Bayesian linear model has been applied, so that the performance degradation evaluation of aero engines could be realized. A reliability evaluation model has been presented based on gamma process, which achieves the accurate evaluation by information fusion. In reliability evaluation model, the shape parameter is estimated by the performance degradation evaluation result, and the scale parameter is estimated by failure, inspection, and repair information. What is more, with such reliability evaluation as input variables and by using particle swarm optimization (PSO, a stochastic optimization of maintenance decision for aircraft engines has been presented, in which the effectiveness and the accuracy are demonstrated by a numerical example.

  15. Effects of Message Interactivity upon Relational Maintenance Strategy in Digital Communications between Organizations and the Public

    Science.gov (United States)

    Liu, Zhan-Qing

    2012-01-01

    Digital communication between organizations and the public is strategically important in shaping mutual understanding and long term relationship. The primary focus of this project was to investigate the relationship between message interactivity and relational maintenance strategy in the email communication process on organization websites. At…

  16. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  17. Model based decision support for planning of road maintenance

    NARCIS (Netherlands)

    van Harten, Aart; Worm, J.M.; Worm, J.M.

    1996-01-01

    In this article we describe a Decision Support Model, based on Operational Research methods, for the multi-period planning of maintenance of bituminous pavements. This model is a tool for the road manager to assist in generating an optimal maintenance plan for a road. Optimal means: minimising the

  18. STRATEGIES FOR THE MANAGEMENT OF BUILT HERITAGE LINKED TO MAINTENANCE AND MONITORING. CASE STUDY OF THE SAN ROQUE NEIGHBORHOOD, CUENCA, ECUADOR

    Directory of Open Access Journals (Sweden)

    M. C. Achig-Balarezo

    2017-10-01

    Full Text Available The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003. At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  19. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  20. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  1. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  2. Statistical Learning Framework with Adaptive Retraining for Condition-Based Maintenance

    International Nuclear Information System (INIS)

    An, Sang Ha; Chang, Soon Heung; Heo, Gyun Young; Seo, Ho Joon; Kim, Su Young

    2009-01-01

    As systems become more complex and more critical in our daily lives, the need for the maintenance based on the reliable monitoring and diagnosis has become more apparent. However, in reality, the general opinion has been that 'maintenance is a necessary evil' or 'nothing can be done to improve maintenance costs'. Perhaps these were true statements twenty years ago when many of the diagnostic technologies were not fully developed. The developments of microprocessor or computer based instrumentation that can be used to monitor the operating condition of plant equipment, machinery and systems have provided the means to manage the maintenance operation. They have provided the means to reduce or eliminate unnecessary repairs, prevent catastrophic machine failures and reduce the negative impact of the maintenance operation on the profitability of manufacturing and production plants. Condition-based maintenance (CBM) techniques help determine the condition of in-service equipment in order to predict when maintenance should be performed. Most of the statistical learning techniques are only valid as long as the physics of a system does not change. If any significant change such as the replacement of a component or equipment occurs in the system, the statistical learning model should be re-trained or re-developed to adapt the new system. In this research, authors will propose a statistical learning framework which can be applicable for various CBMs, and the concept of the adaptive retraining technique will be described to support the execution of the framework so that the monitoring system does not need to be re-developed or re-trained even though there are any significant changes in the system or component

  3. A concept of distributed architecture for maintenance robot systems

    International Nuclear Information System (INIS)

    Asama, Hajime

    1990-01-01

    Aiming at development of a robot system for maintenance tasks in nuclear power plants, a concept of distributed architecture for autonomous robot systems is discussed. At first, based on investigation of maintenance tasks, requirements for maintenance robots are introduced, and structures to realize multi-functions are discussed. Then, as a new design strategy of maintenance robot system, an autonomous and decentralized robot systems is proposed, which is composed of multiple robots, computers, and equipments, and concept of ACTRESS (ACTor-based Robots and Equipments Synthetic System) including communication framework between robotic components is designed. Finally, as a model of ACTRESS, a experimental system is developed, which deals with object-pushing tasks by two micromice and an environment modeler with communicating with each other. Both of parallel independent motion and cooperative motion based on communication is reconciled, and the efficiency of the distributed architecture is verified. (author)

  4. Applying Systems Engineering to Improve the Main Gas Turbine Exhaust System Maintenance Strategy for the CG-47 Ticonderoga Class Cruiser

    Science.gov (United States)

    2015-09-01

    national security and prosperity (U.S. Navy 2014). In perspective, oceans are the lifeblood of the planet and its entire population . The National...maintenance strategy, reliability-centered maintenance, cost, schedule, performance, growth -work, new-work, optimal fleet response plan, time-directed...76 5. Main Gas Turbine Exhaust System Growth -Work ..................77 E. RECOMMENDATIONS TO IMPROVE THE MAIN GAS TURBINE EXHAUST SYSTEM

  5. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  6. Maintenance and replacement policies under technological obsolescence

    International Nuclear Information System (INIS)

    Clavareau, Julien; Labeau, Pierre-Etienne

    2009-01-01

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur

  7. Maintenance and replacement policies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: pelabeau@ulb.ac.be

    2009-02-15

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur.

  8. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    Energy Technology Data Exchange (ETDEWEB)

    Maples, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); van de Pietermen, R. [Energy Research Center of the Netherlands (Netherlands); Obdam, T. [Energy Research Center of the Netherlands (Netherlands)

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  9. Computational framework for risk-based planning of inspections, maintenance, and condition monitoring using discrete Bayesian networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents a computational framework for risk-based planning of inspections and repairs for deteriorating components. Two distinct types of decision rules are used to model decisions: simple decision rules that depend on constants or observed variables (e.g. inspection outcome...... expecte d life-cycle costs. For advanced decision rules, simulations are performed to estimate the expected costs, and dBNs are used within the simulations for decision-making. Information from inspections and condition monitoring are included if available. An example in the paper demonstrates...... the framework and the implemented strategies and decision rules, including various types of condition-based maintenance. The strategies using advanced decision rules lead to reduced costs compared to the simple decision rules when condition monitoring is applied, and the value of condition monitoring...

  10. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  11. Maintenance strategies to reduce downtime due to machine positional errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, A.P.; Fletcher, S.

    2014-01-01

    Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014 Manufacturing strives to reduce waste and increase Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime competentely and similiarly identify the machines performance. Total productive maintenance (TPM) is a maintenance progr...

  12. Development of electromagnetic induction diagnostics technology for condition based maintenance

    International Nuclear Information System (INIS)

    Mawatari, Shingo; Oeda, Kaoru; Yatogi, Hideo; Fukuchi, Taira; Ueno, Tadashi

    2008-01-01

    In ROKKASHO Reprocessing Plant (below, called 'RRP'), we have applied Condition Based Maintenance to rotating equipment with vibration diagnostics technology. However, a few rotating equipment are difficult to diagnose definitely, because have structural problems which exercise vibrational noise to peripheral and be impossible to install vibratory sensor. Electromagnetic induction diagnostics technology which measure magnetic fields to eddy current which is induced to rotary through static magnetic field, diagnose deterioration behavior such as abrasion and crack. As a result, it has possibilities to clear above problems. Therefore, we started our basic researches with this technology for Condition Based Maintenance. In this paper, it introduces basic data about 'Non-seal pump' that have installed in RRP. As a result, this technology is a possibility that be able to detect Condition Based Maintenance. (author)

  13. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  14. Consistency maintenance for constraint in role-based access control model

    Institute of Scientific and Technical Information of China (English)

    韩伟力; 陈刚; 尹建伟; 董金祥

    2002-01-01

    Constraint is an important aspect of role-based access control and is sometimes argued to be the principal motivation for role-based access control (RBAC). But so far few authors have discussed consistency maintenance for constraint in RBAC model. Based on researches of constraints among roles and types of inconsistency among constraints, this paper introduces corresponding formal rules, rule-based reasoning and corresponding methods to detect, avoid and resolve these inconsistencies. Finally, the paper introduces briefly the application of consistency maintenance in ZD-PDM, an enterprise-oriented product data management (PDM) system.

  15. Bayesian based Diagnostic Model for Condition based Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing...... sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using...... for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions....

  16. A framework for the design of a voice-activated, intelligent, and hypermedia-based aircraft maintenance manual

    Science.gov (United States)

    Patankar, Manoj Shashikant

    Federal Aviation Regulations require Aviation Maintenance Technicians (AMTs) to refer to approved maintenance manuals when performing maintenance on airworthy aircraft. Because these manuals are paper-based, larger the size of the aircraft, more cumbersome are the manuals. Federal Aviation Administration (FAA) recognized the difficulties associated with the use of large manuals and conducted studies on the use of electronic media as an alternative to the traditional paper format. However, these techniques do not employ any artificial intelligence technologies and the user interface is limited to either a keyboard or a stylus pen. The primary emphasis of this research was to design a generic framework that would allow future development of voice-activated, intelligent, and hypermedia-based aircraft maintenance manuals. A prototype (VIHAMS-Voice-activated, Intelligent, and Hypermedia-based Aircraft Maintenance System) was developed, as a secondary emphasis, using the design and development techniques that evolved from this research. An evolutionary software design approach was used to design the proposed framework and the structured rapid prototyping technique was used to produce the VIHAMS prototype. VoiceAssist by Creative Labs was used to provide the voice interface so that the users (AMTs) could keep their hands free to work on the aircraft while maintaining complete control over the computer through discrete voice commands. KnowledgePro for Windows sp{TM}, an expert system shell, provided "intelligence" to the prototype. As a result of this intelligence, the system provided expert guidance to the user. The core information contained in conventional manuals was available in a hypermedia format. The prototype's operating hardware included a notebook computer with a fully functional audio system. An external microphone and the built-in speaker served as the input and output devices (along with the color monitor), respectively. Federal Aviation Administration

  17. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  18. Safety-classified steel cylinder reinforced concrete pipelines: mechanism of corrosion, diagnosis and maintenance strategy

    International Nuclear Information System (INIS)

    Aimonino, J.; Jacq, S.

    2015-01-01

    EDF operates 6 km of safety-classified steel cylinder reinforced concrete pipelines spread over 8 PWR nuclear reactors located on the sea coast. These pipelines, placed in galleries, convey approximately 3000 m 3 /h of sea water under a pressure of 4 bar. They have been in operation since the mid eighties or early nineties. Their service life is limited by different scenarios of corrosion by pitting due to the presence of chlorides from sea water. Pipelines are subjected to frequent visual checks that can lead to immediate temporary reinforcement and subsequent replacement. In addition, a diagnosis methodology was developed in order to better anticipate the maintenance operations and in order to assess the remaining service life of pipelines. This methodology combines autopsies of replaced pipes with periodic campaigns of exhaustive half-cell potential mapping. For exhaustive campaigns, the grid spacing was 30 cm x 30 cm, refined to 10 cm x 10 cm in singular zones, on the entire external concrete surface of pipelines, which represents around 6x10 5 measurement points for 6 km of pipelines. Robust specifications were drawn up for the measurement method and the interpretation of the results, initially based on RILEM and ASTM recommendations and then significantly reinforced based on operational feedback. These specifications ensure the implementation and the interpretation of half-cell potential mapping can be carried out on a very large scale and enable the comparison of results between successive campaigns. The diagnosis methodology was a decisive factor in the planning of a preventive maintenance strategy which would enable a pipeline service life of 60 years. (authors)

  19. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  20. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  1. An implementation of infrared thermography in maintenance plans within a world class manufacturing strategy

    Directory of Open Access Journals (Sweden)

    Todorović Petar M.

    2013-01-01

    Full Text Available The objective of the paper is to show the implementation of infrared thermography within World Class Manufacturing (WCM maintenance strategy. The results from infrared thermography inspections in a food processing and packaging solutions company were presented. Applicability of the infrared thermography, during a two-year period, caused a substantial reduction the potential breakdown in the pilot area. Upon feasibility confirmation, the proposed method was spread to other production equipment of the company.

  2. Risk Based Maintenance in Electricity Network Organisations

    NARCIS (Netherlands)

    Mehairjan, R.P.Y.

    2016-01-01

    Presently, maintenance management of assets in infrastructure utilities such as electricity, gas and water are widely undergoing changes towards new working environments. These are mainly driven against the background of stringent regulatory regimes, an ageing asset base, increased customer demands

  3. Advanced Maintenance Simulation by Means of Hand-Based Haptic Interfaces

    Science.gov (United States)

    Nappi, Michele; Paolino, Luca; Ricciardi, Stefano; Sebillo, Monica; Vitiello, Giuliana

    Aerospace industry has been involved in virtual simulation for design and testing since the birth of virtual reality. Today this industry is showing a growing interest in the development of haptic-based maintenance training applications, which represent the most advanced way to simulate maintenance and repair tasks within a virtual environment by means of a visual-haptic approach. The goal is to allow the trainee to experiment the service procedures not only as a workflow reproduced at a visual level but also in terms of the kinaesthetic feedback involved with the manipulation of tools and components. This study, conducted in collaboration with aerospace industry specialists, is aimed to the development of an immersive virtual capable of immerging the trainees into a virtual environment where mechanics and technicians can perform maintenance simulation or training tasks by directly manipulating 3D virtual models of aircraft parts while perceiving force feedback through the haptic interface. The proposed system is based on ViRstperson, a virtual reality engine under development at the Italian Center for Aerospace Research (CIRA) to support engineering and technical activities such as design-time maintenance procedure validation, and maintenance training. This engine has been extended to support haptic-based interaction, enabling a more complete level of interaction, also in terms of impedance control, and thus fostering the development of haptic knowledge in the user. The user’s “sense of touch” within the immersive virtual environment is simulated through an Immersion CyberForce® hand-based force-feedback device. Preliminary testing of the proposed system seems encouraging.

  4. Assessment of diagnostic and prognostic condition indices for efficient and robust maintenance decision-making of systems subject to stress corrosion cracking

    International Nuclear Information System (INIS)

    Huynh, K.T.; Grall, A.; Bérenguer, C.

    2017-01-01

    Seeking condition indices characterizing the health state of a system is a key problem in condition-based maintenance. For this purpose, diagnostic and prognostic models have been unceasingly developed and improved over the past few decades; nevertheless none of them explains thoroughly the impacts of such indices on the effectiveness of maintenance operations. As a complement to these efforts, this paper analyzes the effectiveness of some well-known diagnostic and prognostic indices for maintenance decision-making. The study is based on a system subject to competing risks due to multiple crack paths. A periodic inspection scheme is used to monitor the system health state. Each inspection returns the perfect diagnostic information: the number of cracks, corresponding crack sizes, and the system failure/working state. Based on this information, two kinds of prognostic condition indices are predicted: the average value and probability law of the system residual useful life. The associated condition-based maintenance strategies and cost models are then developed and compared with the ones whose maintenance decisions are based on diagnostic condition indices. The comparison results allow us to conclude on the performance and on the robustness of these strategies, hence giving some suggestions on the choice of reliable condition indices for maintenance decision-making. - Highlights: • Developing a new and generic degradation and failure model. • Synthesizing diagnostic and prognostic condition indices on the basis of the developed degradation and failure model. • Building diagnosis and prognosis-based maintenance strategies, and developing the associated cost models. • Assessing the performance and robustness of the considered strategies to find out reliable indices.

  5. Reducing costs with optimized maintenance strategies. Energie AG Oberoesterreich's practical experience with computer-aided maintenance planning and order processing; Kostensenkung durch optimale Instandhaltungsstrategien. Einsatzerfahrungen der Energie AG Oberoesterreich mit EDV-gestuetzter IH-Planung und Auftragsabwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Lechner, K.D.; Raffelsberger, K.; Steininger, W. [Energie AG Oberoesterreich (Austria); Roeben, U. [Siemens Power Generation AG, Erlangen (Germany)

    2004-07-01

    With the increasing competition, application of the optimal maintenance strategy is gaining importance. Apart from optimizing direct maintenance costs, the effects on profit (e.g. due to loss of production), follow-up costs in plant operation as well as safety-related aspects and the environmental impact are important factors. Without state-of-the-art plant management and maintenance software, efficiently meeting the resulting requirements is quite impossible. (orig.)

  6. Maintenance modeling and optimization integrating human and material resources

    International Nuclear Information System (INIS)

    Martorell, S.; Villamizar, M.; Carlos, S.; Sanchez, A.

    2010-01-01

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  7. Maintenance modeling and optimization integrating human and material resources

    Energy Technology Data Exchange (ETDEWEB)

    Martorell, S., E-mail: smartore@iqn.upv.e [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Villamizar, M.; Carlos, S. [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Sanchez, A. [Dpto. Estadistica e Investigacion Operativa Aplicadas y Calidad, Universidad Politecnica Valencia (Spain)

    2010-12-15

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  8. The effects of ergonomic stressors on process tool maintenance and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.

    1998-03-31

    This study examines ergonomic stressors associated with front-end process tool maintenance, relates them to decreased machine utilization, and proposes solution strategies to reduce their negative impact on productivity. Member company ergonomists observed technicians performing field maintenance tasks on seven different bottleneck tools and recorded ergonomic stressors using SEMaCheck, a graphics-based, integrated checklist developed by Sandia National Laboratories. The top ten stressors were prioritized according to a cost formula that accounted for difficulty, time, and potential errors. Estimates of additional time on a task caused by ergonomic stressors demonstrated that machine utilization could be increased from 6% to 25%. Optimal solution strategies were formulated based on redesign budget, stressor cost, and estimates of solution costs and benefits

  9. Consistency maintenance for constraint in role-based access control model

    Institute of Scientific and Technical Information of China (English)

    韩伟力; 陈刚; 尹建伟; 董金祥

    2002-01-01

    Constraint is an important aspect of role-based access control and is sometimes argued to be the principal motivation for role-based access control (RBAC). But so far'few authors have discussed consistency maintenance for constraint in RBAC model. Based on researches of constraints among roles and types of inconsistency among constraints, this paper introduces correaponding formal rules, rulebased reasoning and corresponding methods to detect, avoid and resolve these inconsistencies. Finally,the paper introduces briefly the application of consistency maintenance in ZD-PDM, an enterprise-ori-ented product data management (PDM) system.

  10. Selective maintenance for multi-state series–parallel systems under economic dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.; Pandey, Mayank

    2014-01-01

    This paper presents a study on selective maintenance for multi-state series–parallel systems with economically dependent components. In the selective maintenance problem, the maintenance manager has to decide which components should receive maintenance activities within a finite break between missions. All the system reliabilities in the next operating mission, the available budget and the maintenance time for each component from its current state to a higher state are taken into account in the optimization models. In addition, the components in series–parallel systems are considered to be economically dependent. Time and cost savings will be achieved when several components are simultaneously repaired in a selective maintenance strategy. As the number of repaired components increases, the saved time and cost will also increase due to the share of setting up between components and another additional reduction amount resulting from the repair of multiple identical components. Different optimization models are derived to find the best maintenance strategy for multi-state series–parallel systems. A genetic algorithm is used to solve the optimization models. The decision makers may select different components to be repaired to different working states based on the maintenance objective, resource availabilities and how dependent the repair time and cost of each component are

  11. Reliability Assessment and Reliability-Based Inspection and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramirez, José Rangel

    actions are the most relevant and effective means of control of deterioration. The risk-based inspection planning methodology, based on Bayesian decision theory, represents an important tool to identify the suitable strategy to inspect and control the deterioration in structures such as offshore wind...... performance during the life cycle. The deterioration processes, such as fatigue and corrosion, are typically affecting offshore structural systems. This damage decreases the system performance and increases the risk of failure, thus not fulfilling the established safety criteria. Inspection and maintenance...... to their offshore location, no pollution risks and low human risks since they are unmanned. This allows the allocation of lower reliability level compared to e.g. oil & gas installations. With the incursion to water depths between 20 and 50 meters, the use of jacket and tripod structures represents a feasible...

  12. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  13. Knowledge Management for Large Scale Condition Based Maintenance

    Data.gov (United States)

    National Aeronautics and Space Administration — This presentation will review the use of knowledge management in the development and support of Condition Based Maintenance (CBM) systems for complex systems with...

  14. Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value

    International Nuclear Information System (INIS)

    Marais, Karen B.; Saleh, Joseph H.

    2009-01-01

    Maintenance planning and activities have grown dramatically in importance across many industries and are increasingly recognized as drivers of competitiveness if managed appropriately. Correlated with this observation is the proliferation of maintenance optimization techniques in the technical literature. But while all these models deal with the cost of maintenance (as an objective function or a constraint), only a handful addresses the notion of value of maintenance, and seldom in an analytical or quantitative way. In this paper, we propose that maintenance has intrinsic value and argue that existing cost-centric models ignore an important dimension of maintenance, namely its value, and in so doing, they can lead to sub-optimal maintenance strategies. We develop a framework for capturing and quantifying the value of maintenance activities. Our framework is based on four key components. First, we consider systems that deteriorate stochastically and exhibit multi-state failures, and model their state evolution using Markov chains and directed graphs. Second, we consider that the system provides a flow of service per unit time. This flow in turn is 'priced' and a discounted cash flow is calculated resulting in a present value (PV) for each branch of the graph-or 'value trajectory' of the system. Third as the system ages or deteriorates, it migrates towards lower PV branches of the graph, or lower value trajectories. Fourth, we conceptualize maintenance as an operator (in a mathematical sense) that raises the system to a higher PV branch in the graph. We refer to the value of maintenance as the incremental PV between the pre- and post-maintenance branches of the graphs minus the cost of maintenance. The framework presented here offers rich possibilities for future work in benchmarking existing maintenance strategies based on their value implications, and in deriving new maintenance strategies that are 'value-optimized.'

  15. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  16. The ITER EC H and CD Upper Launcher: Maintenance concepts

    International Nuclear Information System (INIS)

    Ronden, D.M.S.; Baar, M. de; Chavan, R.; Elzendoorn, B.S.Q.; Grossetti, G.; Heemskerk, C.J.M.; Koning, J.F.; Landis, J.-D.; Spaeh, P.; Strauss, D.

    2013-01-01

    Highlights: ► We explain how an overall maintenance strategy defines individual maintenance tasks. ► Concepts are presented for replacement strategies of the in-vessel optical components. ► Vertical placement of the Upper Launcher in the Hot Cell may simplify maintenance. -- Abstract: Maintenance of the ITER EC H and CD Upper Launcher (UL) shall be performed through the use of Remote Handling (RH) in the ITER Hot Cell Facility (HCF). The UL design will have to be fully compliant with ITER RH maintenance requirements and the set of RH tooling and services available in the HCF. This paper describes the development of an overall maintenance strategy for the UL, starting from a listing of all conceivable maintenance operations, including hands-on tasks. Components for which design concepts are discussed in this paper are the Blanket Shield Module (BSM), the steering mirror (M4), the mid optics (M1, M2) and the waveguide (WG) feed-through plate. Aspects related to RH documentation, overall maintenance strategy and design concepts for optimizing the maintainability of the UL are presented

  17. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  18. Structuring AHP-based maintenance policy selection

    NARCIS (Netherlands)

    Goossens, Adriaan; Basten, Robertus Johannes Ida; Hummel, J. Marjan; van der Wegen, Leonardus L.M.

    2015-01-01

    We aim to structure the maintenance policy selection process for ships, using the Analytic Hierarchy Process (AHP). Maintenance is an important contributor to reach the intended life-time of capital technical assets, and it is gaining increasing interest and relevance. A maintenance policy is a

  19. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  20. Predictive Maintenance (PdM) Centralization for Significant Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Dale

    2010-09-15

    Cost effective predictive maintenance (PdM) technologies and basic energy calculations can mine energy savings form processes or maintenance activities. Centralizing and packaging this information correctly empowers facility maintenance and reliability professionals to build financial justification and support for strategies and personnel to weather global economic downturns and competition. Attendees will learn how to: Systematically build a 'pilot project' for applying PdM and tracking systems; Break down a typical electrical bill to calculate energy savings; Use return on investment (ROI) calculations to identify the best and highest value options, strategies and tips for substantiating your energy reduction maintenance strategies.

  1. Maintenance system improvement in cast iron foundry

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2011-07-01

    Full Text Available The work presents the issue of technical equipment management in an iron foundry basing on the assumptions of the TPM system (Total Productive Maintenance. Exploitation analysis of automatic casting lines has been carried out and their work’s influence on the whole production system’s functioning has been researched. Within maintenance system improvement, implementation of autonomic service and planned lines’ review have been proposed in order to minimize the time of breakdown stoppages. The SMED method was used to optimize changeover time, and the OEE (Overall Equipment Effectiveness was applied to evaluate the level of resources usage before and after implementing changes. Further, the influence of the maintenance strategy of casting devices’ efficiency on own costs of casting manufac- ture was estimated.

  2. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  3. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  4. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  5. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  6. Maintenance contract strategies for reliability at minimum cost

    International Nuclear Information System (INIS)

    Gamman, E.

    1992-01-01

    The conference paper deals with offshore contract philosophies concerning maintenance. The main philosophies of the contract should be built on the following key success factors: Safe operations and correct quality must be sustained at any time; the maintenance contractor should be viewed as a cooperation partner, not only as a supplier; optimum exploitation of learning curve effects and economies of scale. The paper illustrates the importance of each of them in a contract context with a few recommendations

  7. Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: A survey of strategies for harmonizing evolution and accuracy

    International Nuclear Information System (INIS)

    Villanueva, J.F.; Sanchez, A.I.; Carlos, S.; Martorell, S.

    2008-01-01

    This paper presents the results of a survey to show the applicability of an approach based on a combination of distribution-free tolerance interval and genetic algorithms for testing and maintenance optimization of safety-related systems based on unavailability and cost estimation acting as uncertain decision criteria. Several strategies have been checked using a combination of Monte Carlo (simulation)--genetic algorithm (search-evolution). Tolerance intervals for the unavailability and cost estimation are obtained to be used by the genetic algorithms. Both single- and multiple-objective genetic algorithms are used. In general, it is shown that the approach is a robust, fast and powerful tool that performs very favorably in the face of noise in the output (i.e. uncertainty) and it is able to find the optimum over a complicated, high-dimensional nonlinear space in a tiny fraction of the time required for enumeration of the decision space. This approach reduces the computational effort by means of providing appropriate balance between accuracy of simulation and evolution; however, negative effects are also shown when a not well-balanced accuracy-evolution couple is used, which can be avoided or mitigated with the use of a single-objective genetic algorithm or the use of a multiple-objective genetic algorithm with additional statistical information

  8. Multiple Learning Strategies Project. Building Maintenance & Engineering. Visually Impaired.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is designed for visually impaired students in the vocational area of building maintenance and engineering. The twenty-eight learning modules are organized into six units: floor care, general maintenance tasks; restrooms; carpet care; power and hand tools; and cabinet construction. Each module, printed in large block…

  9. Estimation of dynamic treatment strategies for maintenance therapy of children with acute lymphoblastic leukaemia: an application of history-adjusted marginal structural models

    DEFF Research Database (Denmark)

    Rosthøj, Susanne; Keiding, Niels; Schmiegelow, Kjeld

    2012-01-01

    Childhood acute lymphoblastic leukaemia is treated with long-term intensive chemotherapy. During the latter part of the treatment, the maintenance therapy, the patients receive oral doses of two cytostatics. The doses are tailored to blood counts measured on a weekly basis, and the treatment is t...... of the methods in relation to the formulation of alternative dosing strategies for the maintenance therapy....

  10. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  11. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  12. Three AREVA tools for maintenance and outage support

    International Nuclear Information System (INIS)

    Lumpe, A.

    2012-01-01

    WlS is a knowledge-based database for the support of nuclear maintenance for components of different types It is productive since 2004 and has been continuously developed according to customer requirements. WIS allows for a centralized management of maintenance information and knowledge, including strategies, scheduling and reporting. WIS is already utilized in national and international NPPs. lts main advantages are: Support of service documentation for plant and service company employees, Support of integration into already existing IT infrastructure, Support of information and knowledge sharing, Easy and intuitive information usage, Savings by using standardized approach.

  13. Research of nuclear power plant in-service maintenance based on virtual reality

    International Nuclear Information System (INIS)

    Wang Yong; Kuang Weijun

    2015-01-01

    This paper presents a method of constructing nuclear power plant in-service maintenance virtual simulation scene and virtual maintenance process. Taking air baffles dismantling process of CAP1400(China Advanced Passive 1400) nuclear power plant as an instance, this paper discusses ergonomics, space analysis, time assessment based on virtual reality in the process of in-service maintenance. It demonstrates the advantage of using VR technology to design and verify in-service maintenance process of nuclear power plant compared to the conventional way. (author)

  14. Risk-informed optimisation of railway tracks inspection and maintenance procedures

    International Nuclear Information System (INIS)

    Podofillini, Luca; Zio, Enrico; Vatn, Jorn

    2006-01-01

    Nowadays, efforts are being made by the railway industry for the application of reliability-based and risk-informed approaches to maintenance optimisation of railway infrastructures, with the aim of reducing the operation and maintenance expenditures while still assuring high safety standards. In particular, in this paper, we address the use of ultrasonic inspection cars and develop a methodology for the determination of an optimal strategy for their use. A model is developed to calculate the risks and costs associated with an inspection strategy, giving credit to the realistic issues of the rail failure process and including the actual inspection and maintenance procedures followed by the railway company. A multi-objective optimisation viewpoint is adopted in an effort to optimise inspection and maintenance procedures with respect to both economical and safety-related aspects. More precisely, the objective functions here considered are such to drive the search towards solutions characterized by low expenditures and low derailment probability. The optimisation is performed by means of a genetic algorithm. The work has been carried out within a study of the Norwegian National Rail Administration (Jernbaneverket)

  15. Production and Maintenance Planning for a Deteriorating System with Operation-Dependent Defectives

    Directory of Open Access Journals (Sweden)

    Héctor Rivera-Gómez

    2018-01-01

    Full Text Available This paper provides new insights to the area of sustainable manufacturing systems at analyzing the novel paradigm of integrated production logistics, quality, and maintenance design. For this purpose, we investigate the optimal production and repair/major maintenance switching strategy of an unreliable deteriorating manufacturing system. The effects of the deterioration process are mainly observed on the failure intensity and on the quality of the parts produced, where the rate of defectives depends on the production rate. When unplanned failures occur, either a minimal repair or a major maintenance could be conducted. The integration of availability and quality deterioration led us to propose a new stochastic dynamic programming model where optimality conditions are derived through the Hamilton-Jacobi-Bellman equations. The model defined the joint production and repair/major maintenance switching strategies minimizing the total cost over an infinite planning horizon. In the results, the influence of the deterioration process were evident in both the production and maintenances control parameters. A numerical example and an extensive sensitivity analysis were conducted to illustrate the usefulness of the results. Finally, the proposed control policy was compared with alternative strategies based on common assumptions of the literature in order to illustrate its efficiency.

  16. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  17. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    of maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use......, there was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with low back...

  18. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2015-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and information technology, which facilitates the remote collection of condition data. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To

  19. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  20. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  1. A human factors approach to effective maintenance

    International Nuclear Information System (INIS)

    Penington, J.; Shakeri, S.

    2006-01-01

    Traditionally in the field of Human Factors within the nuclear industry, the focus has been to identify the potential for human errors in operating tasks, and develop strategies to prevent their occurrence, provide recovery mechanisms, and mitigate the consequences of error as appropriate. Past experience has demonstrated however a significant number of human errors within the nuclear industry occur during maintenance tasks. It is for this reason, and the fact that our nuclear power plants are ageing and increasingly in need of maintenance, that the industry must pay more attention to maintenance tasks. The purpose of this paper is to present a framework for effective maintenance programs, and based upon this framework discuss an approach (an audit tool) that can be used to both design such a program, and to assess existing programs. In addition, this tool can form the basis of cost benefit decisions relating to priorities for improvements to existing programs. (author)

  2. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  3. Challenges of a community based pragmatic, randomised controlled trial of weight loss maintenance.

    Science.gov (United States)

    Randell, Elizabeth; McNamara, Rachel; Shaw, Christine; Espinasse, Aude; Simpson, Sharon Anne

    2015-12-18

    Randomised controlled trials (RCTs) have a reputation for being inherently difficult to deliver as planned and often face unforeseen challenges and delays, particularly in relation to organisational and governance difficulties, participant interest, constraints due to allocation of costs, local investigator interest and lengthy bureaucracy. Recruitment is often difficult and the challenges faced often impact on the cost and delivery of a successful trial within the funded period. This paper reflects upon the challenges faced in delivering a pragmatic RCT of weight loss maintenance in a community setting and suggests some potential solutions. The weight loss maintenance in adults trial aimed to evaluate the impact of a 12 month, individually tailored weight maintenance intervention on BMI 3 years from randomisation. Participants were recruited primarily from participant identification centres (PICs)-GP surgeries, exercise on referral schemes and slimming world. The intervention was delivered in community settings. A recruitment strategy implementation plan was drafted to address and monitor poor recruitment. Delays in opening and recruitment were experienced early on. Some were beyond the control of the study team such as; disagreement over allocation of national health service costs and PIC classification as well as difficulties in securing support from research networks. That the intervention was delivered in community settings was often at the root of these issues. Key items to address at the design stage of future trials include feasibility of eligibility criteria. The most effective element of the recruitment implementation plan was to refocus sources of recruitment and target only those who could fulfil the eligibility criteria immediately. Learnings from this trial should be kept in mind by those designing similar studies in the future. Considering potential governance, cost and research network support implications at the design stage of pragmatic trials of

  4. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  5. Performance-based maintenance procurement by Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    2004-01-01

    OTB Research institute has established a long-term research program to performance-based maintenance procurement in the technical management of housing stock. Stakeholders: housing associations, contractors and the Dutch Building Research Foundation are directly involved in this research program.

  6. Maintenance strategy and availabity increasing of a gas compression station in the oil industry

    Directory of Open Access Journals (Sweden)

    Nilis Adriano dos Santos

    2016-03-01

    Full Text Available The purpose of this article was to propose a maintenance strategy and a set of improvement actions for increasing the availability in a compression station of waste gases from the petroleum distillation process, composed of two alternative compressors A and B in a plant of the oil industry. The research method was the quantitative modeling. The methodology includes the calculation of the current availability and suggesting actions to raise it. Time to repair (TTR and time between failures (TBF were modeled for the individual compressors and for the gas compression station as a whole. With the average values of the models (MTBF and MTTR were calculated individual availabilities of A and B (32.4% and 83.3%, respectively and global, 96.7%. The data were collected from the company's information system. By the form factors associated with TBF, it was possible to affirm that, despite operating for over twenty years, both machines are in the premature failures phase. This fact is due to the exchange of raw materials, which occurred about five years ago: the plant proceeded to process heavier oil, originated from the pre-salt layer, for which the installation was not designed. Such divergence may be characterized as a design fault, associated with the corrective maintenance strategy. Finally, a list of improvements projects was presented to increase the availability of the post and terminate the phase of premature failures.

  7. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  8. Development of maintenance tools based on tribology for nuclear power plant

    International Nuclear Information System (INIS)

    Iwai, Yoshiro; Honda, Tomomi; Yoshinaga, Shigeki

    2007-01-01

    Many tribological problems occur in the maintenance of nuclear power plants. In this paper, we introduced our developed maintenance tools based on tribology such as a particle counter and wear sensors. Their principals were shown briefly and their usefulness was clarified by the experiments on monitoring of wear. (author)

  9. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    International Nuclear Information System (INIS)

    Sanchez, Ana; Carlos, Sofia; Martorell, Sebastian; Villanueva, Jose F.

    2009-01-01

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral

  10. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Ana [Department of Statistics and Operational Research, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Carlos, Sofia [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Martorell, Sebastian [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)], E-mail: smartore@iqn.upv.es; Villanueva, Jose F. [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)

    2009-01-15

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral.

  11. An Abstraction Hierarchy based mobile PC display design in NPP maintenance considering the level of expertise

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Seong, Poong Hyun

    2011-01-01

    Research highlights: → Six levels of Abstraction Hierarchy based information for maintenance were proposed. → Errors and workload with AH based information display were reduced for LL subjects. → Design concerns discovered can be applied to practical use of mobile maintenance aids. - Abstract: Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on the hierarchy is proposed and its design considerations are discussed in this study. Six levels of hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using the hierarchy, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, a hierarchy-based MMA is designed for the maintenance tasks. An experiment is conducted using the hierarchy-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that a hierarchy-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the hierarchy-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, the hierarchy model applied MMAs can be used as an effective maintenance supporting tool.

  12. Methadone maintenance therapy as evidence based drug abuse ...

    African Journals Online (AJOL)

    Methadone maintenance therapy as evidence based drug abuse planning in ... drugs are being used as artificial problem-solvers such as frustrations, stress or ... Drug use is a problem to users when it begins to cause some damage to their ...

  13. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  14. Space station orbit maintenance

    Science.gov (United States)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  15. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2012-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and ICT technology, so that the condition data can be collected remotely. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To reduce the

  16. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  17. Qualitative study on maintenance management in Moroccan industries

    Science.gov (United States)

    Naji, Amal; El Oumami, Mohamed; Bouksour, Otmane; Beidouri, Zitouni

    2018-05-01

    Maintenance management is, and has been studied in depth, especially for strategies to be implemented in industry, even though, authors note that there is a gap between literature and management adopted by industries. In this paper, we present a qualitative study in five Moroccan industries to investigate “how maintenance is managed” rather than “how it should be”. The questionnaire utilized for the study consists on semi-structured and open-ended questions. We consider factors and variables related to maintenance management and we explore the relationships between those factors. The original contribution of this paper is to provide a «real view »about maintenance management in Moroccan industries, which could help to improve understanding of barriers to implementing maintenance strategy.

  18. Prioritization of pavement maintenance sections using objective based Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Sarfaraz Ahmed

    2017-03-01

    Full Text Available The application of Analytic Hierarchy Process (AHP method for the prioritization of pavement maintenance sections is widespread now-a-days. Although the evaluation of pavement maintenance section through AHP method is simple, where the relative importance (on Saaty’s scale assigned to each parameter in the hierarchy varies between the experts (transportation professionals consulted, which leads to discrepancies in the final rankings of the sections’, due to the subjectivity in the process. Further, experts base their decisions solely on their experience while consideration is not given to the actual quantitative physical condition of the roads. To overcome these difficulties an objective based AHP method is proposed in this study, where pairwise comparison values are assigned based on the collected field data from a road network in Mumbai city, consisting of 28 road sections. The final ranking list of candidate sections takes into consideration the priority weight of alternatives, which reflect the road conditions. The solution of priority ratings of AHP method is compared with the corresponding solution of road condition index method, a traditional pavement maintenance procedure. The findings of the present study suggest that objective based AHP method is more suitable for the prioritization of pavement maintenance of roads. Keywords: Prioritization, Analytic Hierarchy Process, Road condition index, Objective method, Rating and ranking

  19. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  20. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  1. Mechatronics technology in predictive maintenance method

    Science.gov (United States)

    Majid, Nurul Afiqah A.; Muthalif, Asan G. A.

    2017-11-01

    This paper presents recent mechatronics technology that can help to implement predictive maintenance by combining intelligent and predictive maintenance instrument. Vibration Fault Simulation System (VFSS) is an example of mechatronics system. The focus of this study is the prediction on the use of critical machines to detect vibration. Vibration measurement is often used as the key indicator of the state of the machine. This paper shows the choice of the appropriate strategy in the vibration of diagnostic process of the mechanical system, especially rotating machines, in recognition of the failure during the working process. In this paper, the vibration signature analysis is implemented to detect faults in rotary machining that includes imbalance, mechanical looseness, bent shaft, misalignment, missing blade bearing fault, balancing mass and critical speed. In order to perform vibration signature analysis for rotating machinery faults, studies have been made on how mechatronics technology is used as predictive maintenance methods. Vibration Faults Simulation Rig (VFSR) is designed to simulate and understand faults signatures. These techniques are based on the processing of vibrational data in frequency-domain. The LabVIEW-based spectrum analyzer software is developed to acquire and extract frequency contents of faults signals. This system is successfully tested based on the unique vibration fault signatures that always occur in a rotating machinery.

  2. Preventive Maintenance Interval Prediction: a Spare Parts Inventory Cost and Lost Earning Based Model

    Directory of Open Access Journals (Sweden)

    O. A. Adebimpe

    2015-06-01

    Full Text Available In this paper, some preventive maintenance parameters in manufacturing firms were identified and used to develop cost based functions in terms of machine preventive maintenance. The proposed cost based model considers system’s reliability, cost of keeping spare parts inventory and lost earnings in deriving optimal maintenance interval. A case of a manufacturing firm in Nigeria was observed and the data was used to evaluate the model.

  3. Main maintenance operations for Test Blanket Systems in ITER TBM port cells

    Energy Technology Data Exchange (ETDEWEB)

    Pascal, R., E-mail: romain.pascal@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Cortes, P.; Friconneau, J.-P.; Giancarli, L.M.; Gotewal, K.K.; Iseli, M.; Kim, B.Y.; Levesy, B.; Martins, J.-P.; Merola, M. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Patisson, L. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Siarras, A. [Sogetti, Parc de la Duranne, 13857 Aix-en-Provence (France); Tesini, A. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: • The Test Blanket System components layout in Port Cell room is described. • The maintenance of the two Test Blanket Systems in ITER port cell is addressed. • The overall replacement/maintenance strategy is defined. • The main maintenance tasks of the systems are discussed. • The maintenance strategy and required tools are presented. -- Abstract: Each Test Blanket System in ITER is formed by an in-vessel component, the Test Blanket Module, and several associated ancillary systems (coolant and Tritium systems, instrumentation and control systems). The paper describes the overall replacement/maintenance strategy and the main maintenance tasks that have to be considered in the design of the systems. It shows that there are no critical issues.

  4. Intelligent control and maintenance of management integrated system based on multi-agents for coal preparation plant

    Energy Technology Data Exchange (ETDEWEB)

    Meng, F.; Wang, Y. [China University of Mining and technology, Xuzhou (China). School of Information and Electrical Engineering

    2006-06-15

    This paper discusses the progress of computer integrated processing (CIPS) of coal preparation and then presents an intelligence controlled production process, device-maintenance and production-management system of coal preparation based on multi-agents (IICMMS-CP). The construction of the IICMMS-CP, the distributed network control system based on live intelligence control stations and the strategy of implementing a distributed intelligence control system are studied in order to overcome the disadvantages brought about by the wide use of the PLC system by coal preparation plants. The software frame, based on a Multi-Agent Intelligence Control and Maintenance Management integrated system, is studied and the implementation methods of IICMMS-CP are discussed. The characteristics of distributed architecture, cooperation and parallel computing meet the needs of integrated control of coal preparation plants with large-scale spatial production distribution, densely-related processes and complex systems. Its application further improves the reliability and precision of process control, accuracy of fault identification and intelligence of production adjustment, establishes a technical basis for system integration and flexible production. The main function of the system has been tested in a coal preparation plant to good effect in stabilizing product quality, improving efficiency and reducing consumption. 17 refs., 4 figs.

  5. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  6. Laser-Based Maintenance and Repair Technologies for Reactor Components

    International Nuclear Information System (INIS)

    Masaki Yoda; Naruhiko Mukai; Makoto Ochiai; Masataka Tamura; Satoshi Okada; Katsuhiko Sato; Motohiko Kimura; Yuji Sano; Noboru Saito; Seishi Shima; Tetsuo Yamamoto

    2004-01-01

    Toshiba has developed various laser-based maintenance and repair technologies and applied them to existing nuclear power plants. Laser-based technology is considered to be the best tool for remote processing in nuclear power plants, and particularly so for the maintenance and repair of reactor core components. Accessibility could be drastically improved by a simple handling system owing to the absence of reactive force against laser irradiation and the flexible optical fiber. For the preventive maintenance, laser peening (LP) technology was developed and applied to reactor components in operating BWR plants. LP is a novel process to improve residual stress from tensile to compressive on material surface layer by irradiating focused high-power laser pulses in water. We have developed a fiber-delivered LP system as a preventive maintenance measure against stress corrosion cracking (SCC). Laser ultrasonic testing (LUT) has a great potential to be applied to the remote inspection of reactor components. Laser-induced surface acoustic wave (SAW) inspection system was developed using a compact probe with a multi-mode optical fiber and an interferometer. The developed system successfully detected a micro slit of 0.5 mm depth on weld metal and heat-affected zone (HAZ). An artificial SCC was also detected by the system. We are developing a new LP system combined with LUT to treat the inner surface of bottom-mounted instruments (BMI) of PWR plants. Underwater laser seal welding (LSW) technology was also developed to apply surface crack. LSW is expected to isolate the crack tip from corrosive water environment and to stop the propagation of the crack. Rapid heating and cooling of the process minimize the heat effect, which extends the applicability to neutron-irradiated material. This paper describes recent advances in the development and application of such laser-based technologies. (authors)

  7. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used to upd...

  8. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  9. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...... monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution...

  10. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  11. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud

    2017-01-01

    monitoring, fault detection and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  12. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  13. Remediation of Gremikha Coastal maintenance base - status of the project

    International Nuclear Information System (INIS)

    Pillette-Cousin, L.; Stepennov, B.S.; Gorbatchev, A.

    2008-01-01

    The former coastal maintenance base in Gremikha is located in the Kola Peninsula, along the Barents Sea, about 300 km east from Murmansk. There is no road or railway to get there, therefore the only possible connection is either by sea or by helicopter. Remediation of the Gremikha coastal maintenance base (CMB) is now one of the main priorities for Rosatom (the Agency for Atomic Energy of the Russian Federation) because nuclear and radioactive waste are currently stored in conditions which do not meet the up-to-date safety and regulatory requirements and it might represent an environmental hazard and a risk of misappropriation of the nuclear material stored there. (authors)

  14. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  15. Strategies for adding adaptive learning mechanisms to rule-based diagnostic expert systems

    Science.gov (United States)

    Stclair, D. C.; Sabharwal, C. L.; Bond, W. E.; Hacke, Keith

    1988-01-01

    Rule-based diagnostic expert systems can be used to perform many of the diagnostic chores necessary in today's complex space systems. These expert systems typically take a set of symptoms as input and produce diagnostic advice as output. The primary objective of such expert systems is to provide accurate and comprehensive advice which can be used to help return the space system in question to nominal operation. The development and maintenance of diagnostic expert systems is time and labor intensive since the services of both knowledge engineer(s) and domain expert(s) are required. The use of adaptive learning mechanisms to increment evaluate and refine rules promises to reduce both time and labor costs associated with such systems. This paper describes the basic adaptive learning mechanisms of strengthening, weakening, generalization, discrimination, and discovery. Next basic strategies are discussed for adding these learning mechanisms to rule-based diagnostic expert systems. These strategies support the incremental evaluation and refinement of rules in the knowledge base by comparing the set of advice given by the expert system (A) with the correct diagnosis (C). Techniques are described for selecting those rules in the in the knowledge base which should participate in adaptive learning. The strategies presented may be used with a wide variety of learning algorithms. Further, these strategies are applicable to a large number of rule-based diagnostic expert systems. They may be used to provide either immediate or deferred updating of the knowledge base.

  16. Optimization of Reliability Centered Maintenance Bassed on Maintenance Costs and Reliability with Consideration of Location of Components

    Directory of Open Access Journals (Sweden)

    Mahdi Karbasian

    2011-03-01

    Full Text Available The reliability of designing systems such as electrical and electronic circuits, power generation/ distribution networks and mechanical systems, in which the failure of a component may cause the whole system failure, and even the reliability of cellular manufacturing systems that their machines are connected to as series are critically important. So far approaches for improving the reliability of these systems have been mainly based on the enhancement of inherent reliability of any system component or increasing system reliability based on maintenance strategies. Also in some of the resources, only the influence of the location of systems' components on reliability is studied. Therefore, it seems other approaches have been rarely applied. In this paper, a multi criteria model has been proposed to perform a balance among a system's reliability, location costs, and its system maintenance. Finally, a numerical example has been presented and solved by the Lingo software.

  17. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  18. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  19. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  20. Maintenance and test strategies to optimize NPP equipment performance

    International Nuclear Information System (INIS)

    Mayer, S.; Tomic, B.

    2000-01-01

    This paper proposes an approach to maintenance optimization of nuclear power plant components, which can help to increase both safety and availability. In order to evaluate the benefits of preventive maintenance on a quantitative basis, a software code has been developed for component performance and reliability simulation of safety related nuclear power plant equipment. A three state Markov model will be introduced, considering a degraded state in addition to an operational state and a failed state. (author)

  1. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  2. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  3. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  4. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  5. Performance based regulation - The maintenance rule

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Richard P. [NRR/DOTS/TQMP, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, M/S OWFN 10A19, Washington, D.C. 20555 (United States)

    1997-07-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  6. Performance based regulation - The maintenance rule

    International Nuclear Information System (INIS)

    Correia, Richard P.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  7. Corrosion Sensor Development for Condition-Based Maintenance of Aircraft

    Directory of Open Access Journals (Sweden)

    Gino Rinaldi

    2012-01-01

    Full Text Available Aircraft routinely operate in atmospheric environments that, over time, will impact their structural integrity. Material protection and selection schemes notwithstanding, recurrent exposure to chlorides, pollution, temperature gradients, and moisture provide the necessary electrochemical conditions for the development and profusion of corrosion in aircraft structures. For aircraft operators, this becomes an important safety matter as corrosion found in a given aircraft must be assumed to be present in all of that type of aircraft. This safety protocol and its associated unscheduled maintenance requirement drive up the operational costs of the fleet and limit the availability of the aircraft. Hence, there is an opportunity at present for developing novel sensing technologies and schemes to aid in shifting time-based maintenance schedules towards condition-based maintenance procedures. In this work, part of the ongoing development of a multiparameter integrated corrosion sensor is presented. It consists of carbon nanotube/polyaniline polymer sensors and commercial-off-the-shelf sensors. It is being developed primarily for monitoring environmental and material factors for the purpose of providing a means to more accurately assess the structural integrity of aerospace aluminium alloys through fusion of multiparameter sensor data. Preliminary experimental test results are presented for chloride ion concentration, hydrogen gas evolution, humidity variations, and material degradation.

  8. Maintenance Strategies to Reduce Downtime Due to\\ud Machine Positional Errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, Andrew P.; Fletcher, Simon

    2014-01-01

    Manufacturing strives to reduce waste and increase\\ud Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime\\ud competently and similarly identify the machines’ performance.\\ud Total productive maintenance (TPM) is a maintenance program that involves concepts for maintaining plant and equipment effectively. OEE is a pow...

  9. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  10. Maintenance management of railway infrastructures based on reliability analysis

    International Nuclear Information System (INIS)

    Macchi, Marco; Garetti, Marco; Centrone, Domenico; Fumagalli, Luca; Piero Pavirani, Gian

    2012-01-01

    Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

  11. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  12. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  13. Prognostics and Condition Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2002-01-01

    Scientists at the Pacific Northwest National Laboratory (PNNL) have examined the necessity for understanding and controlling the aging process of both safety-specific plant components and the infrastructure that supports these processes. In this paper we examine the preliminary development of aging precursor metrics and their correlation with degradation rate and projected machine failure. Degradation specific correlations are currently being developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest. The derivative relationship between the performance, degradation and the underlying stressor set is used to gain a first principles approach to prognostic determinations. The assumptions used for the design basis of process equipment have always been as much art as science and for this reason have been misused or relegated into obscurity in all but the nuclear industry. The ability to successfully link degradation and expected equipment life to stressor intensity level is valuable in that it quantifies the degree of machine stress for a given production level. This allows two major improvements in the O and M of process machinery: (1) the actual versus intended machine environment can be understood and brought into much better alignment, and (2) the end goal can define operations and maintenance strategies in terms of life cycle and economic management of plant assets. A holistic infrastructure approach, as applied through a CBM framework, will allow intelligent, automated diagnostic and prognostic programs to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  14. Optimizing Maintenance of Constraint-Based Database Caches

    Science.gov (United States)

    Klein, Joachim; Braun, Susanne

    Caching data reduces user-perceived latency and often enhances availability in case of server crashes or network failures. DB caching aims at local processing of declarative queries in a DBMS-managed cache close to the application. Query evaluation must produce the same results as if done at the remote database backend, which implies that all data records needed to process such a query must be present and controlled by the cache, i. e., to achieve “predicate-specific” loading and unloading of such record sets. Hence, cache maintenance must be based on cache constraints such that “predicate completeness” of the caching units currently present can be guaranteed at any point in time. We explore how cache groups can be maintained to provide the data currently needed. Moreover, we design and optimize loading and unloading algorithms for sets of records keeping the caching units complete, before we empirically identify the costs involved in cache maintenance.

  15. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  16. Joint optimization of condition-based maintenance and production lot-sizing

    NARCIS (Netherlands)

    Peng, H.; van Houtum, G.J.J.A.N.

    2016-01-01

    Due to the development of sensor technologies nowadays, condition-based maintenance (CBM) programs can be established and optimized based on the data collected through condition monitoring. The CBM activities can significantly increase the uptime of a machine. However, they should be conducted in a

  17. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm......Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship...

  18. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  19. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  20. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  1. Risk Based Maintenance of Offshore Wind Turbines Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    This paper presents how Bayesian networks can be used to make optimal decisions for repairs of offshore wind turbines. The Bayesian network is an efficient tool for updating a deterioration model whenever new information becomes available from inspections/monitoring. The optimal decision is found...... such that the preventive maintenance effort is balanced against the costs to corrective maintenance including indirect costs to reduced production. The basis for the optimization is the risk based Bayesian decision theory. The method is demonstrated through an application example....

  2. Risk mitigation strategies for operations and maintenance activities.

    Science.gov (United States)

    2012-04-01

    The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...

  3. How safe is defect specific maintenance of steam generator tubes?

    International Nuclear Information System (INIS)

    Dvorsek, T.; Cizelj, L.

    1995-01-01

    Outside diameter stress corrosion cracking at the tube to tube support plate intersections is assessed in the paper. The impact of defect specific maintenance on steam generator operation safety and reliability was investigated. This was performed by comparing efficiencies of defect specific and traditional maintenance strategy. The efficiency was studied through expected primary-to-secondary leak rate and tube rupture probability in a case of postulated accidental operating conditions, and number of tubes which shall be plugged using both maintenance strategies. In general, the efficiency of specific maintenance is function of particular steam generator and operating cycle. (author)

  4. Structural health monitoring methodology for aircraft condition-based maintenance

    Science.gov (United States)

    Saniger, Jordi; Reithler, Livier; Guedra-Degeorges, Didier; Takeda, Nobuo; Dupuis, Jean Pierre

    2001-06-01

    Reducing maintenance costs while keeping a constant level of safety is a major issue for Air Forces and airlines. The long term perspective is to implement condition based maintenance to guarantee a constant safety level while decreasing maintenance costs. On this purpose, the development of a generalized Structural Health Monitoring System (SHMS) is needed. The objective of such a system is to localize the damages and to assess their severity, with enough accuracy to allow low cost corrective actions. The present paper describes a SHMS based on acoustic emission technology. This choice was driven by its reliability and wide use in the aerospace industry. The described SHMS uses a new learning methodology which relies on the generation of artificial acoustic emission events on the structure and an acoustic emission sensor network. The calibrated acoustic emission events picked up by the sensors constitute the knowledge set that the system relies on. With this methodology, the anisotropy of composite structures is taken into account, thus avoiding the major cause of errors of classical localization methods. Moreover, it is adaptive to different structures as it does not rely on any particular model but on measured data. The acquired data is processed and the event's location and corrected amplitude are computed. The methodology has been demonstrated and experimental tests on elementary samples presented a degree of accuracy of 1cm.

  5. Bayesian Based Diagnostic Model for Condition Based Maintenance of Offshore Wind Farms

    Directory of Open Access Journals (Sweden)

    Masoud Asgarpour

    2018-01-01

    Full Text Available Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using each fault detection method, and second, a diagnosis matrix, representing the individual outcome of each fault detection method. Once the confidence and diagnosis matrices of a component are defined, the individual diagnoses of each fault detection method are combined into a final verdict on the fault state of that component. Furthermore, this paper introduces a Bayesian updating model based on observations collected by inspections to decrease the uncertainty of initial confidence matrix. The framework and implementation of the presented diagnostic model are further explained within a case study for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions.

  6. New Models for Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.

    component that was causing a large amount of downtime were identified. Further analysis with the Reliability-Centred Maintenance concept helped determine the most appropriate maintenance strategy. In the final perspective, long-term strategic decisions were the focus. Asset Management and especially Asset...... Life-Cycle Management were studied using a case study. The case study analysis was used to generate strategies to help managers perform maintenance more proactively and to prepare the management of the offshore wind farm turbines for the future. Existing literature on Asset Life-Cycle Management has......Operations and maintenance (O&M) processes are important for keeping offshore wind turbines in operation. Costs related to such activities constitute approximately 30% of the lifetime cost of an offshore wind farm project. Currently, the offshore wind energy industry has shown a rapid increase...

  7. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  8. Analisis Penerapan Relationship Maintenance Strategy Melalui Penggunaan Media Sosial(Studi Pada Twitter Perbankan di Indonesia

    Directory of Open Access Journals (Sweden)

    Rahmatul Jannatin Naimah

    2016-04-01

    Full Text Available Nowadays, banks are actively using twitter in order to maintain relationships with customers. Unfortunately, the trend of using social media as Relationship Maintenance  Strategy  (RMS  for  the  banking  industry  is  not  supported  by adequate research in the realm of marketing public relation science. Positivity, openness, task sharing, networking, access, and assurance are six dimensions that can be used to measure the application of RMS through twitter. Thus, this research aims to analyze whether there are differences in the implementation of RMS in the Indonesia Banking Industry through content analysis of its offi cial twitter.  The  banks  that  will  be  further  investigated  are  the  three  top  banks belonging  to  Indonesia  Bank  Loyalty  Index  (IBLI  and  Most  Followed  Bank (MFB.  Research  fi ndings  resulted  Banks  belonging  to  IBLI  and  MFB  group  has  a different  level  implementation  of  RMS  through  twitter.  The  overall  level  of implementation were found in two groups are still very low, especially in the task sharing dimension. IBLI banks more implement the dimension of RMS than MFB bank group. Assurance was most widely used on the two banking groups.  Keywords : Relationship  Maintenance  Strategy,  Marketing  Public  Relation,  Banking, Twitter.

  9. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  10. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  11. Earnings with Condition Based Maintenance; Ganhos com manutencao preditiva baseada em dados de processo em tempo real

    Energy Technology Data Exchange (ETDEWEB)

    Barabas, Elizabeth [Softbrasil Automacao, Sao Paulo, SP (Brazil)

    2008-07-01

    Keeping active in perfect functioning is essential for any company. Today, the maintenance has been performed in most of the stops for maintenance. In a modern industrial environment, where the systems provide data and process information in real time, it is possible bring the performance of the plant to a optimized level, through the maintenance based on condition of equipment. This work described the earnings with CBM (Condition Based Maintenance)

  12. Concept design of CFETR superconducting magnet system based on different maintenance ports

    International Nuclear Information System (INIS)

    Zheng, Jinxing; Liu, Xufeng; Song, Yuntao; Wan, Yuanxi; Li, Jiangang; Wu, Sontao; Wan, Baonian; Ye, Minyou; Wei, Jianghua; Xu, Weiwei; Liu, Sumei; Weng, Peide; Lu, Kun; Luo, Zhengping

    2013-01-01

    Highlights: • This article discussed the concept design of the magnet system of CFETR based on different maintenance port cases. • The major and minor radius of plasma is 5.7 m and 1.6 m, and the central magnetic field was designed as 4.5/5.0 T. • The different maintenance ports design have little impact on the design of TF and CS coils’ design, but have certain impact on the PF coils’ design. -- Abstract: CFETR which stands for “China Fusion Engineering Test Reactor” is a new tokamak device. Its magnet system includes the Toroidal Field (TF) winding, Center solenoid winding (CS) and Poloidal Field (PF) winding. The main goal of the project is to build a fusion engineering Tokamak reactor with its fusion power is 50–200 MW and should be self-sufficiency by blanket. In order to ensure the maintenance ports design and maintenance method, this article discussed the concept design of the magnet system based on different maintenance port cases. The paper detailed studied the magnet system of CFETR including the electromagnetic analysis and parameters for TF (CS)PF. Besides, the volt-seconds of ohmic field are presented as detailed as possible in this paper. In addition, the calculations and optimizations of equilibrium field which should guarantee the plasma discharge of single null shape is carried out. The design work reported here illustrates that the present maintenance ports will not have a great impact on the design of the magnet system. The concept design of the magnet system can meet the requirement of the physical target

  13. New optimization strategies of pavement maintenance: A case study for national road network in Indonesia using integrated road management system

    Science.gov (United States)

    Hamdi, Hadiwardoyo, Sigit P.; Correia, A. Gomes; Pereira, Paulo

    2017-06-01

    A road network requires timely maintenance to keep the road surface in good condition onward better services to improve accessibility and mobility. Strategies and maintenance techniques must be chosen in order to maximize road service level through cost-effective interventions. This approach requires an updated database, which the road network in Indonesia is supported by a manual and visual survey, also using NAASRA profiler. Furthermore, in this paper, the deterministic model of deterioration was used. This optimization model uses life cycle cost analysis (LCCA), applied in an integrated manner, using IRI indicator, and allows determining the priority of treatment, type of treatment and its relation to the cost. The purpose of this paper was focussed on the aspects of road maintenance management, i.e., maintenance optimization models for different levels of traffic and various initial of road distress conditions on the national road network in Indonesia. The implementation of Integrated Road Management System (IRMS) can provide a solution to the problem of cost constraints in the maintenance of the national road network. The results from this study found that as the lowest as agency cost, it will affect the increasing of user cost. With the achievement of the target plan scenario Pl000 with initial value IRI 2, it was found that the routine management throughout the year and in early reconstruction and periodic maintenance with a 30 mm thick overlay, will simultaneously provide a higher net benefit value and has the lowest total cost of transportation.

  14. An overview of the recent advances in delay-time-based maintenance modelling

    International Nuclear Information System (INIS)

    Wang, Wenbin

    2012-01-01

    Industrial plant maintenance is an area which has enormous potential to be improved. It is also an area attracted significant attention from mathematical modellers because of the random phenomenon of plant failures. This paper reviews the recent advances in delay-time-based maintenance modelling, which is one of the mathematical techniques for optimising inspection planning and related problems. The delay-time is a concept that divides a plant failure process into two stages: from new until the point of an identifiable defect, and then from this point to failure. The first stage is called the normal working stage and the second stage is called the failure delay-time stage. If the distributions of the two stages can be quantified, the relationship between the number of failures and the inspection interval can be readily established. This can then be used for optimizing the inspection interval and other related decision variables. In this review, we pay particular attention to new methodological developments and industrial applications of the delay-time-based models over the last few decades. The use of the delay-time concept and modeling techniques in other areas rather than in maintenance is also reviewed. Future research directions are also highlighted. - Highlights: ► Reviewed the recent advances in delay-time-based maintenance models and applications. ► Compared the delay-time-based models with other models. ► Focused on methodologies and applications. ► Pointed out future research directions.

  15. Risk-based and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, K.; Nagai, S.; Akikuni, Y.; Fujiwara, T.; Furuya, K.; Matsumoto, S.; Takagi, K.; Kawabata, T.

    2003-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants. (orig.)

  16. Joint optimization of preventive maintenance and spare parts inventory for an optimal production plan with consideration of CO_2 emission

    International Nuclear Information System (INIS)

    Ba, Kader; Dellagi, Sofiene; Rezg, Nidhal; Erray, Walid

    2016-01-01

    This article presents a joint optimization of spare parts inventory and preventive maintenance. While minimizing CO_2 emissions, this approach is based on an optimal production plan achieved thanks to the HMMS model. The process which is studied in this paper only manufactures one type of product. The purpose of the paper is to determine for a random demand over a given period, a cost-effective production plan and a maintenance policy which integrates a spare parts strategy in accordance with environmental requirements and regulations. Our green spare parts management can be defined as a set of actions that are applied in order to decrease the spare parts footprint in its lifetime (Ba et al., 2015) [1]. Indeed, we take into account the spare parts characteristics (new or used) which will be used during maintenance actions (preventive or corrective) to preserve the environment. Consequently, we set up analytical models based on the effect of the production rate on the system deterioration so as to substantially cut the maintenance costs, production costs and CO_2 emissions. To evaluate the performance of our models, we give some illustrative examples. - Highlights: • Establishment of an optimal production plan for a manufacturing process. • Cost-effective maintenance strategy with a green spare parts strategy. • Possibility to choose between used and new spare parts to execute maintenance action.

  17. [PARAMOUNT trial: clinical meaning of continuous maintenance therapy in lung cancer].

    Science.gov (United States)

    Gridelli, Cesare

    2015-05-01

    Non-small cell lung cancer (NSCLC) remains one of the leading causes of cancer related deaths worldwide across both sex. Patients with Advanced -NSCLC (A-NSCLC) do not have curative treatment options, so the primary endpoint of every therapeutic decision aims to prolong survival, improving or maintain a good Quality of Life (QoL). Histology could represent a positive predictive factor for patients with Non squamous NSCLC (Nsq-NSCLC) respect to pemetrexed treatment. Pemetrexed is an antifolate that inhibits primarily thymidylate synthase (TS), together with dihydrofolate reductase and glycinamide ribonucleotide formyl transferase. Pemetrexed in combination with cisplatin is approved in the first line setting and as monotherapy in the switch or continuous maintenance of Non Squamous A-NSCLC. Maintenance therapy is a widely used therapeutic option in other solid and hematologic malignancies, but in the A-NSCLC represent an innovative approach. The rationale in this new setting of patients is based on the evidence that patients who benefit from an initial induction therapy platinum based may benefit from maintenance therapy with the third generation agent dropping the platinum drug after four to six cycles. We can define two types of maintenance therapy: continuation maintenance and switch maintenance. Major results in prolonging Overall Survival (OS) was reported with the continuation maintenance strategy as in the PARAMOUNT trial.

  18. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  19. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  20. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  1. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty

    International Nuclear Information System (INIS)

    Su, Chun; Wang, Xiaolin

    2016-01-01

    In practice, customers can decide whether to buy an extended warranty or not, at the time of item sale or at the end of the basic warranty. In this paper, by taking into account the moments of customers purchasing two-dimensional extended warranty, the optimization of imperfect preventive maintenance for repairable items is investigated from the manufacturer's perspective. A two-dimensional preventive maintenance strategy is proposed, under which the item is preventively maintained according to a specified age interval or usage interval, whichever occurs first. It is highlighted that when the extended warranty is purchased upon the expiration of the basic warranty, the manufacturer faces a two-stage preventive maintenance optimization problem. Moreover, in the second stage, the possibility of reducing the servicing cost over the extended warranty period is explored by classifying customers on the basis of their usage rates and then providing them with customized preventive maintenance programs. Numerical examples show that offering customized preventive maintenance programs can reduce the manufacturer's warranty cost, while a larger saving in warranty cost comes from encouraging customers to buy the extended warranty at the time of item sale. - Highlights: • A two-dimensional PM strategy is investigated. • Imperfect PM strategy is optimized by considering both two-dimensional BW and EW. • Customers are categorized based on their usage rates throughout the BW period. • Servicing cost of the EW is reduced by offering customized PM programs. • Customers buying the EW at the time of sale is preferred for the manufacturer.

  2. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  3. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme

    International Nuclear Information System (INIS)

    Sainero Garcia, J.

    1993-01-01

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  4. A multi-level maintenance policy for a multi-component and multifailure mode system with two independent failure modes

    International Nuclear Information System (INIS)

    Zhu, Wenjin; Fouladirad, Mitra; Bérenguer, Christophe

    2016-01-01

    This paper studies the maintenance modelling of a multi-component system with two independent failure modes with imperfect prediction signal in the context of a system of systems. Each individual system consists of multiple series components and the failure modes of all the components are divided into two classes due to their consequences: hard failure and soft failure, where the former causes system failure while the later results in inferior performance (production reduction) of system. Besides, the system is monitored and can be alerted by imperfect prediction signal before hard failure. Based on an illustration example of offshore wind farm, in this paper three maintenance strategies are considered: periodic routine, reactive and opportunistic maintenance. The periodic routine maintenance is scheduled at fixed period for each individual system in the perspective of system of systems. Between two successive routine maintenances, the reactive maintenance is instructed by the imperfect prediction signal according to two criterion proposed in this study for the system components. Due to the high setup cost and practical restraints of implementing maintenance activities, both routine and reactive maintenance can create the opportunities of maintenance for the other components of an individual system. The life cycle of the system and the cost of the proposed maintenance policies are analytically derived. Restrained by the complexity from both the system failure modelling and maintenance strategies, the performances and application scope of the proposed maintenance model are evaluated by numerical simulations. - Highlights: • We study the life behavior of a complex system with two failure modes. • We consider the imperfect prediction signal of potential failure by monitoring. • We propose an integrated maintenance policy with three levels based on wind turbine. • We derive the mathematical cost formulations for the proposed maintenance policy.

  5. An open-source automated continuous condition-based maintenance platform for commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George

    2016-09-09

    This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.

  6. Optimum analysis of pavement maintenance using multi-objective genetic algorithms

    Directory of Open Access Journals (Sweden)

    Amr A. Elhadidy

    2015-04-01

    Full Text Available Road network expansion in Egypt is considered as a vital issue for the development of the country. This is done while upgrading current road networks to increase the safety and efficiency. A pavement management system (PMS is a set of tools or methods that assist decision makers in finding optimum strategies for providing and maintaining pavements in a serviceable condition over a given period of time. A multi-objective optimization problem for pavement maintenance and rehabilitation strategies on network level is discussed in this paper. A two-objective optimization model considers minimum action costs and maximum condition for used road network. In the proposed approach, Markov-chain models are used for predicting the performance of road pavement and to calculate the expected decline at different periods of time. A genetic-algorithm-based procedure is developed for solving the multi-objective optimization problem. The model searched for the optimum maintenance actions at adequate time to be implemented on an appropriate pavement. Based on the computing results, the Pareto optimal solutions of the two-objective optimization functions are obtained. From the optimal solutions represented by cost and condition, a decision maker can easily obtain the information of the maintenance and rehabilitation planning with minimum action costs and maximum condition. The developed model has been implemented on a network of roads and showed its ability to derive the optimal solution.

  7. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  8. Multiple Learning Strategies Project. Building Maintenance & Engineering. Regular Vocational. [Vol. 2.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…

  9. Risk based maintenance to increase safety and decrease costs

    International Nuclear Information System (INIS)

    Phillips, J.H.

    2000-01-01

    Risk-Based techniques have been developed for commercial nuclear power plants for the last eight years by a team working through the ASME Center for Research and Technology Development (CRTD). System boundaries and success criteria is defined using the Probabilistic Risk Analysis or Probabilistic Safety Analysis developed to meet the Individual Plant Evaluation. Final ranking of components is by a plant expert panel similar to the one developed for the Maintenance Rule. Components are identified as being high risk-significant or low risk-significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of plants. Results from the first risk-based inspection pilot plant indicates safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. Pilot studies on risk-based testing indicate that about 60% of pumps and 25 to 30% of valves in plants are high safety-significant The reduction in inspection and testing reduces the person-rem exposure and resulting in further increases in safety. These techniques have been documented in publications by the ASME CRTD which are referenced. (author)

  10. Measures to reduce maintenance therapy with oral corticosteroid in adults with severe asthma

    DEFF Research Database (Denmark)

    Nguyen, Vivi Q; Ulrik, Charlotte S

    2016-01-01

    BACKGROUND: Maintenance therapy with oral corticosteroid (OCS) is used, although not based on evidence, for patients with severe asthma, but OCS is associated with serious adverse effects; therefore, management strategies aimed at steroid sparing are important. OBJECTIVE: To provide an update...

  11. Effectiveness of Gross Model-Based Emotion Regulation Strategies Training on Anger Reduction in Drug-Dependent Individuals and its Sustainability in Follow-up.

    Science.gov (United States)

    Massah, Omid; Sohrabi, Faramarz; A'azami, Yousef; Doostian, Younes; Farhoudian, Ali; Daneshmand, Reza

    2016-03-01

    Emotion plays an important role in adapting to life changes and stressful events. Difficulty regulating emotions is one of the problems drug abusers often face, and teaching these individuals to express and manage their emotions can be effective on improving their difficult circumstances. The present study aimed to determine the effectiveness of the Gross model-based emotion regulation strategies training on anger reduction in drug-dependent individuals. The present study had a quasi-experimental design wherein pretest-posttest evaluations were applied using a control group. The population under study included addicts attending Marivan's methadone maintenance therapy centers in 2012 - 2013. Convenience sampling was used to select 30 substance-dependent individuals undergoing maintenance treatment who were then randomly assigned to the experiment and control groups. The experiment group received its training in eight two-hour sessions. Data were analyzed using analysis of co-variance and paired t-test. There was significant reduction in anger symptoms of drug-dependent individuals after gross model based emotion regulation training (ERT) (P emotion regulation strategies training. Based on the results of this study, we may conclude that the gross model based emotion regulation strategies training can be applied alongside other therapies to treat drug abusers undergoing rehabilitation.

  12. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  13. The Nordic Maintenance Care Program – An interview study on the use of maintenance care in a selected group of Danish chiropractors

    Directory of Open Access Journals (Sweden)

    Leboeuf-Yde Charlotte

    2009-06-01

    Full Text Available Abstract Background Although maintenance care appears to be relatively commonly used among chiropractors, the indications for its use are incompletely understood. A questionnaire survey was recently carried out among Swedish chiropractors in order to identify their choice of various management strategies, including maintenance care. That study revealed a common pattern of choice of strategies. However, it would be necessary to verify these findings in another study population and to obtain some additional information best collected through an interview. Objectives The main aim of the present study was to attempt to reproduce the findings in the Swedish study and to obtain more information on the use of maintenance care. Method A group of 11 chiropractors were selected because they used maintenance care. They were interviewed using the questionnaire from the previous Swedish survey. The questionnaire consisted of a simple description of a hypothetical patient with low back pain and nine possible ways in which the case could develop ("scenarios". They could choose between six different management strategies for each scenario. In addition, the chiropractors were encouraged to provide their own definition of maintenance care in an open-ended question. Interviews were taped, transcribed and analyzed. For the open-ended question, statements were identified relating to six pre hoc defined topics on the inclusion criteria/rationale for maintenance care, the frequency of treatments, and the duration of the maintenance care program. Results The open-ended question revealed that in patients with low back pain, maintenance care appears to be offered to prevent new events. The rationale was to obtain optimal spinal function. There appears to be no common convention on the frequency of treatments and duration of the treatment program was not mentioned by any of the interviewees. Conclusion The results from the questionnaire in the Danish survey showed that

  14. Multiple Learning Strategies Project. Building Maintenance & Engineering. Low Reader. [Vol. 2.

    Science.gov (United States)

    Steinberg, A.; And Others

    This instructional package is one of two designed for low reader students (those reading at grade level 3-6) in the vocational area of building maintenance and engineering. The forty-four learning modules are organized into eleven units: chalkboards; carpet care; office cleaning; grounds; sanitation; boiler maintenance and operation; power and…

  15. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  16. Multiple Learning Strategies Project. Building Maintenance & Engineering. Low Reader. [Vol. 1.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of two designed for low reader students (those reading at a 3-6 grade level) in the vocational area of building maintenance and engineering. The forty-six learning modules are organized into three units: floor care; general maintenance tasks; and restrooms. Each module includes these elements: a performance…

  17. Simulation based comparison of predictive maintenance policies

    NARCIS (Netherlands)

    Tinga, Tiedo; Janssen, R.H.P.; Steenbergen, R.; van Gelder, P.

    2013-01-01

    When an asset is operated in variable conditions, its operational efficiency can be improved significantly when the maintenance is performed in a dynamic manner. This means that variations in usage and operating environment are taken into account when deciding on the length of the maintenance

  18. Weight maintenance as a tight rope walk - a Grounded Theory study

    Directory of Open Access Journals (Sweden)

    Weinehall Lars

    2010-02-01

    Full Text Available Abstract Background Overweight and obesity are considerable public health problems internationally as well as in Sweden. The long-term results of obesity treatment are modest as reported by other studies. The importance of extending the focus to not only comprise obesity treatment but also prevention of weight gain is therefore being emphasized. However, despite the suggested change in focus there is still no consensus on how to prevent obesity or maintain weight. This study reports findings from a qualitative study focusing on attitudes, behaviors and strategies important for primary weight maintenance in a middle-aged population. Methods In depth interviews were conducted with 23 maintainers and four slight gainers in Sweden. The interviews were transcribed and an analysis of weight maintenance was performed using Grounded Theory. Results Based on the informants' stories, describing attitudes, behaviors and strategies of importance for primary weight maintenance, a model illustrating the main findings, was constructed. Weight maintenance was seen as "a tightrope walk" and four strategies of significance for this "tightrope walk" were described as "to rely on heritage", "to find the joy", "to find the routine" and "to be in control". Eleven "ideal types" were included in the model to illustrate different ways of relating to the main strategies. These "ideal types" described more specific attitudes and behaviors such as; eating food that is both tasteful and nutritious, and choosing exercise that provides joy. However, other somewhat contradictory behaviors were also found such as; only eating nutritious food regardless of taste, and being physically active to control stress and emotions. Conclusion This study show great variety with regards to attitudes, strategies and behaviors important for weight maintenance, and considerations need to be taken before putting the model into practice. However, the results from this study can be used within

  19. Development of system decision support tools for behavioral trends monitoring of machinery maintenance in a competitive environment

    Science.gov (United States)

    Adeyeri, Michael Kanisuru; Mpofu, Khumbulani

    2017-06-01

    The article is centred on software system development for manufacturing company that produces polyethylene bags using mostly conventional machines in a competitive world where each business enterprise desires to stand tall. This is meant to assist in gaining market shares, taking maintenance and production decisions by the dynamism and flexibilities embedded in the package as customers' demand varies under the duress of meeting the set goals. The production and machine condition monitoring software (PMCMS) is programmed in C# and designed in such a way to support hardware integration, real-time machine conditions monitoring, which is based on condition maintenance approach, maintenance decision suggestions and suitable production strategies as the demand for products keeps changing in a highly competitive environment. PMCMS works with an embedded device which feeds it with data from the various machines being monitored at the workstation, and the data are read at the base station through transmission via a wireless transceiver and stored in a database. A case study was used in the implementation of the developed system, and the results show that it can monitor the machine's health condition effectively by displaying machines' health status, gives repair suggestions to probable faults, decides strategy for both production methods and maintenance, and, thus, can enhance maintenance performance obviously.

  20. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  1. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  2. Cognitive Artificial Intelligence Method for Interpreting Transformer Condition Based on Maintenance Data

    Directory of Open Access Journals (Sweden)

    Karel Octavianus Bachri

    2017-07-01

    Full Text Available A3S(Arwin-Adang-Aciek-Sembiring is a method of information fusion at a single observation and OMA3S(Observation Multi-time A3S is a method of information fusion for time-series data. This paper proposes OMA3S-based Cognitive Artificial-Intelligence method for interpreting Transformer Condition, which is calculated based on maintenance data from Indonesia National Electric Company (PLN. First, the proposed method is tested using the previously published data, and then followed by implementation on maintenance data. Maintenance data are fused to obtain part condition, and part conditions are fused to obtain transformer condition. Result shows proposed method is valid for DGA fault identification with the average accuracy of 91.1%. The proposed method not only can interpret the major fault, it can also identify the minor fault occurring along with the major fault, allowing early warning feature. Result also shows part conditions can be interpreted using information fusion on maintenance data, and the transformer condition can be interpreted using information fusion on part conditions. The future works on this research is to gather more data, to elaborate more factors to be fused, and to design a cognitive processor that can be used to implement this concept of intelligent instrumentation.

  3. Modeling of the maintenance policy of an offshore wind farm

    International Nuclear Information System (INIS)

    Maddens, L.; Labeau, P.E.

    2004-01-01

    Wind energy has a key position in the market of renewable electricity production means. Offshore wind farms offer additional surfaces to exploit this form of energy, together with more favourable wind conditions. Yet offshore windmills ask for higher investment and maintenance costs. Optimising the latter costs should therefore turn out to be particularly beneficial for this technology. The present paper summarizes the main modelling aspects of the maintenance of a typical offshore wind farm, such as the accessibility of the wind turbines and the impact of weather conditions, the cost of the different transport resources, the number of maintenance teams, a tolerated unavailability of part of the windmills, the opportunity to combine corrective and preventive maintenance actions on one or several windmills. All these features were embedded in a Petri net model of the maintenance policy of the farm, allowing to estimate the maintenance costs entailed by several strategies. Advantages and drawbacks of using Petri nets for the modelling of such a maintenance strategy are finally discussed. (authors)

  4. Present state of condition based maintenance (CBM) and its future problem

    International Nuclear Information System (INIS)

    Hashimoto, Satoshi; Nogami, Takeki; Sugiyama, Naoki

    2008-01-01

    New inspection system of the nuclear power plant will be introduced from 2008. In this feature, eleven experts from electric utilities, venders and academia described their views or activities about Condition Based Maintenance (CBM) with a new inspection system attracting attention. These are titled as 'Electric utilities view on CBM and its technology', Deployment results of developed CBM technologies', 'Valve diagnostic analysis support system with wireless technology applied', 'Portable vibration checker', 'Tribology diagnosis with no overhaul', 'Infrared thermograph diagnosis', 'Pipewall thinning inspection and management' and, in addition, the US trend and also the development trend of the CBM advancement technology in the vender and university. CBM technology will be introduced step-by-step and contribute to establish reliability based maintenance. (T. Tanaka)

  5. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  6. Guidance for the design and management of a maintenance plan to assure safety and improve the predictability of a DOE nuclear irradiation facility. Final report

    International Nuclear Information System (INIS)

    Booth, R.S.; Kryter, R.C.; Shepard, R.L.; Smith, O.L.; Upadhyaya, B.R.; Rowan, W.J.

    1994-10-01

    A program is recommended for planning the maintenance of DOE nuclear facilities that will help safety and enhance availability throughout a facility's life cycle. While investigating the requirements for maintenance activities, a major difference was identified between the strategy suitable for a conventional power reactor and one for a research reactor facility: the latter should provide a high degree of predicted availability (referred to hereafter as ''predictability'') to its users, whereas the former should maximize total energy production. These differing operating goals necessitate different maintenance strategies. A strategy for scheduling research reactor facility operation and shutdown for maintenance must balance safety, reliability,and predicted availability. The approach developed here is based on three major elements: (1) a probabilistic risk analysis of the balance between assured reliability and predictability (presented in Appendix C), (2) an assessment of the safety and operational impact of maintenance activities applied to various components of the facility, and (3) a data base of historical and operational information on the performance and requirements for maintenance of various components. These factors are integrated into a set of guidelines for designing a new highly maintainable facility, for preparing flexible schedules for improved maintenance of existing facilities, and for anticipating the maintenance required to extend the life of an aging facility. Although tailored to research reactor facilities, the methodology has broader applicability and may therefore be used to improved the maintenance of power reactors, particularly in anticipation of peak load demands

  7. Estimation of component redundancy in optimal age maintenance

    OpenAIRE

    Siopa, Jorge; Garção, José; Silva, Júlio

    2012-01-01

    The classical Optimal Age-Replacement defines the maintenance strategy based on the equipment failure consequences. For severe consequences an early equipment replacement is recommended. For minor consequences the repair after failure is proposed. One way of reducing the failure consequences is the use of redundancies, especially if the equipment failure rate is decreasing over time, since in this case the preventive replacement does not reduce the risk of failure. The estimation of an ac...

  8. Maintenance optimization and prognostics of residual life - A state of the art report

    Energy Technology Data Exchange (ETDEWEB)

    Nystad, Bent

    2006-01-15

    In many industries a huge part of the daily operational costs are related to maintenance. One key function in cutting costs is in optimization of the maintenance efforts. A major task is to change the work culture and work processes from being repair oriented, with focus on repairing breakdowns, to being proactive and maintain critical parts/systems before failures occur. Estimation of residual life distributions is of great need to obtain an optimum preventive maintenance strategy. In this report two approaches for estimation of residual life are discussed. The first model assumes that the residual life follows a Weibull distribution where the parameters are dependent on expert judgement, inspection data, repair data, and technical health trends. The second model is based on a continuous time Markov chain. In maintenance optimization a quantitative approach like the mean residual life estimation is needed in addition to a qualitative approach like the Reliability Centred Maintenance (RCM) methodology to give support for e.g. optimization of the maintenance overhaul intervals.The use of residual life knowledge in opportunistic maintenance is also discussed.(auth)

  9. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  10. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  11. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    Full text: On standby safety systems, nuclear plants have to balance the requirements of demonstrating the reliability of each system, while maintaining the system and plant availability. With the goal of demonstrating statistical reliability, these systems have extensive testing programs, which often makes the system unavailable and this can impact the plant capacity. The inputs to the process are often safety and regulatory related, resulting in programs that provide a high level of scrutiny on the systems being considered. In such cases, the value of the application of a maintenance optimization strategy, such as Reliability Centered Maintenance (RCM), is questioned. Part of the question stems from the use of the word 'Reliability' in RCM, which implies a level of redundancy when applied to a system maintenance program driven by reliability requirements. A deeper look at the RCM process, however, shows that RCM has the goal of ensuring that the system operates 'reliably' through the application of an integrated maintenance strategy. This is a subtle, but important distinction. Although the system reliability requirements are an important part of the strategy evaluation, RCM provides a broader context where testing is only one part of an overall strategy focused on ensuring that component function is maintained through a combination of monitoring technologies (including testing), predictive techniques, and intrusive maintenance strategies. Each strategy is targeted to identify known component degradation mechanisms. The conclusion is that a maintenance program driven by reliability requirements will tend to have testing defined at a frequency intended to support the needed statistics. The testing demonstrates that the desired function is available today. Maintenance driven by functional requirements and known failure causes, as developed through an RCM assessment, will have frequencies tied to industry experience with components and rely on a higher degree of

  12. Economics analysis of fuel cycle cost of fusion–fission hybrid reactors based on different fuel cycle strategies

    Energy Technology Data Exchange (ETDEWEB)

    Zu, Tiejun, E-mail: tiejun@mail.xjtu.edu.cn; Wu, Hongchun; Zheng, Youqi; Cao, Liangzhi

    2015-01-15

    Highlights: • Economics analysis of fuel cycle cost of FFHRs is carried out. • The mass flows of different fuel cycle strategies are established based on the equilibrium fuel cycle model. • The levelized fuel cycle costs of different fuel cycle strategies are calculated, and compared with current once-through fuel cycle. - Abstract: The economics analysis of fuel cycle cost of fusion–fission hybrid reactors has been performed to compare four fuel cycle strategies: light water cooled blanket burning natural uranium (Strategy A) or spent nuclear fuel (Strategy B), sodium cooled blanket burning transuranics (Strategy C) or minor actinides (Strategy D). The levelized fuel cycle costs (LFCC) which does not include the capital cost, operation and maintenance cost have been calculated based on the equilibrium mass flows. The current once-through (OT) cycle strategy has also been analyzed to serve as the reference fuel cycle for comparisons. It is found that Strategy A and Strategy B have lower LFCCs than OT cycle; although the LFCC of Strategy C is higher than that of OT cycle when the uranium price is at its nominal value, it would become comparable to that of OT cycle when the uranium price reaches its historical peak value level; Strategy D shows the highest LFCC, because it needs to reprocess huge mass of spent nuclear fuel; LFCC is sensitive to the discharge burnup of the nuclear fuel.

  13. Feature-based and object-based attention orientation during short-term memory maintenance.

    Science.gov (United States)

    Ku, Yixuan

    2015-12-01

    Top-down attention biases the short-term memory (STM) processing at multiple stages. Orienting attention during the maintenance period of STM by a retrospective cue (retro-cue) strengthens the representation of the cued item and improves the subsequent STM performance. In a recent article, Backer et al. (Backer KC, Binns MA, Alain C. J Neurosci 35: 1307-1318, 2015) extended these findings from the visual to the auditory domain and combined electroencephalography to dissociate neural mechanisms underlying feature-based and object-based attention orientation. Both event-related potentials and neural oscillations explained the behavioral benefits of retro-cues and favored the theory that feature-based and object-based attention orientation were independent. Copyright © 2015 the American Physiological Society.

  14. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  15. Risk-based inspection and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, Kazunari; Nagai, Satoshi; Akikuni, Yasunari; Fujiwara, Toshihiro; Furuya, Kenichiro; Matsumoto, Shigeru; Takagi, Kentaro; Kawabata, Taro

    2004-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants

  16. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  17. Knowledge maintenance in myCBR

    OpenAIRE

    Aul, Vani; Sauer, Christian; Roth-Berghofer, Thomas

    2014-01-01

    CBR systems, being knowledge based systems, process knowledge. Due to changes in the environment a CBR system’s knowledge model can become outdated, thus creating a need for constant maintenance of said knowledge model. In this paper, we describe an implementation of (semi-)automatic knowledge maintenance of two of the four knowledge containers of CBR systems, specifically case base maintenance and maintenance of similarity measures within the CBR system development SDK myCBR. We describe our...

  18. Telomeres and viruses: common themes of genome maintenance

    Science.gov (United States)

    Deng, Zhong; Wang, Zhuo; Lieberman, Paul M.

    2012-01-01

    Genome maintenance mechanisms actively suppress genetic instability associated with cancer and aging. Some viruses provoke genetic instability by subverting the host’s control of genome maintenance. Viruses have their own specialized strategies for genome maintenance, which can mimic and modify host cell processes. Here, we review some of the common features of genome maintenance utilized by viruses and host chromosomes, with a particular focus on terminal repeat (TR) elements. The TRs of cellular chromosomes, better known as telomeres, have well-established roles in cellular chromosome stability. Cellular telomeres are themselves maintained by viral-like mechanisms, including self-propagation by reverse transcription, recombination, and retrotransposition. Viral TR elements, like cellular telomeres, are essential for viral genome stability and propagation. We review the structure and function of viral repeat elements and discuss how they may share telomere-like structures and genome protection functions. We consider how viral infections modulate telomere regulatory factors for viral repurposing and can alter normal host telomere structure and chromosome stability. Understanding the common strategies of viral and cellular genome maintenance may provide new insights into viral–host interactions and the mechanisms driving genetic instability in cancer. PMID:23293769

  19. Spanish strategy on bioeconomy: Towards a knowledge based sustainable innovation.

    Science.gov (United States)

    Lainez, Manuel; González, José Manuel; Aguilar, Alfredo; Vela, Carmen

    2018-01-25

    Spain launched its own strategy on bioeconomy in January 2016 aiming at boosting a bioeconomy based on the sustainable and efficient production and use of biological resources. It highlights global societal challenges related with agricultural and biotechnological sciences in Spain and the great dynamism of the private sectors involved, particularly the agri-food, biotech and biomass sectors. The targeted sectors are food, agriculture and forestry, conditioned by water availability. It also includes the production of those industrial bioproducts and bioenergy obtained from the use and valorisation of wastes and residues and other non-conventional sources of biomass, in a circular economy. The strategy also puts a focus on rural and coastal development through several uses and services linked to ecosystems. The capacity to generate know-how in this area and the promotion of public and private collaboration are important pillars in order to enhance existing value chains and to create new ones. The strategy is led by R&I and Agriculture, Food and Environment policy managers and largely supported at regional level too. The strategic objective is the maintenance of the bioeconomy as an essential part of Spanish economy to contribute to the economic growth by creating new jobs and fostering investments. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  20. Computer-Based Simulations for Maintenance Training: Current ARI Research. Technical Report 544.

    Science.gov (United States)

    Knerr, Bruce W.; And Others

    Three research efforts that used computer-based simulations for maintenance training were in progress when this report was written: Game-Based Learning, which investigated the use of computer-based games to train electronics diagnostic skills; Human Performance in Fault Diagnosis Tasks, which evaluated the use of context-free tasks to train…

  1. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  2. Research on gesture recognition of augmented reality maintenance guiding system based on improved SVM

    Science.gov (United States)

    Zhao, Shouwei; Zhang, Yong; Zhou, Bin; Ma, Dongxi

    2014-09-01

    Interaction is one of the key techniques of augmented reality (AR) maintenance guiding system. Because of the complexity of the maintenance guiding system's image background and the high dimensionality of gesture characteristics, the whole process of gesture recognition can be divided into three stages which are gesture segmentation, gesture characteristic feature modeling and trick recognition. In segmentation stage, for solving the misrecognition of skin-like region, a segmentation algorithm combing background mode and skin color to preclude some skin-like regions is adopted. In gesture characteristic feature modeling of image attributes stage, plenty of characteristic features are analyzed and acquired, such as structure characteristics, Hu invariant moments features and Fourier descriptor. In trick recognition stage, a classifier based on Support Vector Machine (SVM) is introduced into the augmented reality maintenance guiding process. SVM is a novel learning method based on statistical learning theory, processing academic foundation and excellent learning ability, having a lot of issues in machine learning area and special advantages in dealing with small samples, non-linear pattern recognition at high dimension. The gesture recognition of augmented reality maintenance guiding system is realized by SVM after the granulation of all the characteristic features. The experimental results of the simulation of number gesture recognition and its application in augmented reality maintenance guiding system show that the real-time performance and robustness of gesture recognition of AR maintenance guiding system can be greatly enhanced by improved SVM.

  3. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  4. Mobile equipment maintenance at Elk Valley Coal Corporation Fording River

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Major loading and support equipment, haul trucks, and the number of staff and hourly tradesmen working in the maintenance manpower division at Elk Valley Coal are listed. Maintenance strategies are safety, high maintenance of equipment availabilities and reliability, cost reduction, and maximized productivity of assets. Maintenance assets comprise a large shop, shovel and drill crew, machine shop, light vehicle facility, line crew, radio technicians, and cranes. Most maintenance work is completed in- house. Fording River uses a Computerized Maintenance Management System (CMMS) that was developed in-house to match business needs. Several examples of the application of Reliability Centered Maintenance (RCM) are described. 12 figs., 2 tabs.

  5. A maintenance optimization model for mission-oriented systems based on Wiener degradation

    International Nuclear Information System (INIS)

    Guo, Chiming; Wang, Wenbin; Guo, Bo; Si, Xiaosheng

    2013-01-01

    Over the past few decades, condition-based maintenance (CBM) has attracted many researchers because of its effectiveness and practical significance. This paper deals with mission-oriented systems subject to gradual degradation modeled by a Wiener stochastic process within the context of CBM. For a mission-oriented system, the mission usually has constraints on availability/reliability, the opportunity for maintenance actions, and the monitoring type (continuous or discrete). Furthermore, in practice, a mission-oriented system may undertake some preventive maintenance (PM) and after such PM, the system may return to an intermediate state between an as-good-as new state and an as-bad-as old state, i.e., the PM is not perfect and only partially restores the system. However, very few CBM models integrated these mission constraints together with an imperfect nature of the PM into the course of optimizing the PM policy. This paper develops a model to optimize the PM policy in terms of the maintenance related cost jointly considering the mission constraints and the imperfect PM nature. A numerical example is presented to demonstrate the proposed model. The comparison with the simulated results and the sensitivity analysis show the usefulness of the optimization model for mission-oriented system maintenance presented in this paper.

  6. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  7. Routine maintenance: safety term based work selection; Selecao de trabalho baseado no prazo seguro

    Energy Technology Data Exchange (ETDEWEB)

    Camargo, Albair de; Filho, Antnio S.; Brendler, Fabiano E.; Adamatti, Gilberto A.; Naruto, Itiro; Araujo, Luiz C.F.; Puerari, Roberto [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    This work has objective to present the experience of improvement of routine maintenance system in some refineries of the PETROBRAS system, with the purpose to increase the efficiency in the Industrial Maintenance Management (cost), Utilization and HSE (Health, Safety and Environment), key of success of a petroleum company. The new system is based on the implantation of the culture of work selection in the safe period, through elaboration of new maintenance procedure, with emphasis in decisions shared between Operation and Maintenance Team, resulting in reduction of emergencies, making possible contract of services of maintenance for packages and improved allocation of resources. This work treat about improvement of the system in use, in view of that it has already taken in consideration the consequence of fail in the maintenance with participation of the operators. Besides of these challenge, this modification was made without causing riots in the process of implantation of SAP. As main result, financial profits had got better of resources with increase of safety, considering that they are analyzed in a way it that systematized potential risks. (author)

  8. Multiple Learning Strategies Project. Building Maintenance & Engineering. Educable Mentally Impaired. [Vol. 2.

    Science.gov (United States)

    Constantini, Debra; And Others

    This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty-four learning modules are organized into six units: general maintenance tasks; restrooms; chalkboards; carpet care; office cleaning; and grounds. Each module includes these elements:…

  9. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  10. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  11. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Deterioration processes such as fatigue and corrosion are typically affecting offshore structures. To "control" this deterioration, inspection and maintenance activities are developed. Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and control...... the deterioration in structures such as offshore wind turbines (OWT). Besides these methods, the integration of condition monitoring information (CMI) can optimize the mitigation activities as an updating tool. In this paper, a framework for risk-based inspection and maintenance planning (RBI) is applied for OWT....... With the integration of CMI by means Bayesian inference, a slightly change of first inspection times are coming up, influenced by the reduction of the uncertainty and harsher or milder external agents....

  12. ANALYSIS OF GROUP MAINTENANCE STRATEGY -ROAD PAVEMENT AND SEWERAGE PIPES-

    Science.gov (United States)

    Tanimoto, Keishi; Sugimoto, Yasuaki; Miyamoto, Shinya; Nada, Hideki; Hosoi, Yoshihiko

    Recently, it is critical to manage deteriorating sewerage and road facilities efficiently and strategically. Since the sewerage pipes are mostly installed under road pavement, the works for the replacement of the sewerage pipes are partially common to the works for the road. This means that the replacement cost can be saved by coordinating the timing of the replacements by sewerage pipe and road pavement. The purpose of the study is to develop the model based on Markov decision process to derive the optimal group maintenance policy so as to minimize lifecycle cost. Then the model is applied to case study area and demonstrated to estimate the lifecycle cost using statistical data such as pipe replacement cost, road pavement rehabilitation cost, and state of deterioration of pipes and road pavement.

  13. Multiple Learning Strategies Project. Building Maintenance & Engineering. Educable Mentally Impaired. [Vol. 1.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty learning modules are organized into two units: floor care and general maintenance tasks. Each module includes these elements: a performance objective page which tells the student…

  14. Successful factors to a better maintenance effectiveness in Cernavoda NPP 's Unit 1

    International Nuclear Information System (INIS)

    Riedel, M.; Bigu, D.

    2001-01-01

    Two tables are presented titled 'Existing maintenance-specific and maintenance-related plant programs' and 'New programs intended to be developed', respectively. In the first table the following items are indicated and commented: 1. Corrective maintenance program; 2. EQ Program; 3. Equipment maintenance history program; 4. In service inspection program; 5. Lube oil analysis program; 6. MOVs program; 7. Operational test procedures; 8. Performance evaluation program; 9. Preventive maintenance program; 10. Spares management program; 11. Vibration monitoring program. In table 2 the following items are indicated and commented: 1. Check Valves program; 2. Electrical Cable Diagnostics; 3. Erosion-corrosion; 4. Temperature monitoring (infra red thermography; noncontact thermometer); 5. Airborne Ultrasound Detection program; 6. PdM Program. A flowchart is presented in figure 1 showing the maintenance strategies' selection. In figure 2 there is presented a flowchart showing the plants maintenance current approach. Finally, in figure 3 the station maintenance program is presented in a diagram structured on the following fields: concepts, requirements, strategies, specific programs and plans

  15. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  16. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    International Nuclear Information System (INIS)

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  17. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  18. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  19. MOVES: A knowledge-based system for maintenance planning for motor-operated valves

    International Nuclear Information System (INIS)

    Winter, M.

    1987-01-01

    Over the past several years, knowledge-based expert systems have emerged as an important part of the general research area known as artificial intelligence. This paper describes a cooperative effort between faculty members at Iowa State University and engineers at the Duane Arnold Energy Center [a 545-MW(electric) boiling water reactor operated by Iowa Electric Light and Power Company] to explore the development of an advisory system for valve maintenance planning. This knowledge-based program, known as Motor-Operated Valves Expert System (MOVES), has a data base that currently includes safety-related motor-operated valves (∼117 valves). Valve maintenance was selected as the subject for the expert system because of the importance of valves in nuclear plant and their impact of plant availability. MOVES is being developed using the microcomputer-(IBM compatible) based expert system tool INSIGHT2+. The authors have found that the project benefits both the university and the utility

  20. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  1. Maintenance cost savings - snubber elimination with limit stops

    International Nuclear Information System (INIS)

    Cloud, R.L.; Taylor, W.H.

    1993-01-01

    'Active' snubbers can be replaced with 'passive' Limit Stops using two separate strategies. One is a straightforward piping re-analysis to optimize the number of dynamic supports and replace remaining snubbers with Limit Stops. A second approach is to take implicit advantage of the margins afforded by the ASME Code Case N-411 reduced damping ratios and simply replace snubbers one-for-one with no re-analysis. Both methods result in major maintenance cost savings and both have been discussed with the NRC. Approaches to maintenance cost reduction using these strategies are discussed in this paper

  2. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  3. Experimental study on the plant state estimation for the condition-based maintenance

    International Nuclear Information System (INIS)

    Harada, J. I.; Takahashi, M.; Kitamura, M.; Wakabayashi, T.

    2006-01-01

    A framework of maintenance support system based on the plant state estimation using diverse methods has been proposed and the validity of the plant state estimation methods has been experimentally evaluated. The focus has been set on the construction of the BN for the objective system with the scale and complexity as same as real world systems. Another focus has been set on the other functions for maintenance support system such as signal processing tool and similarity matching. The validity of the proposed inference method has been confirmed through numerical experiments. (authors)

  4. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  5. Integrated vibration-based maintenance: an approach for continuous reduction in LCC. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Najjar, B [ER Konsult Utveckling AB, Vaexjoe (Sweden)

    1999-12-31

    The biggest thread in achieving and maintaining high equipment effectiveness can be stated as: whether the improved manufacturing processes capable of producing quality products at a competitive cost. The effect of a new vibration-based maintenance concept, called Total Quality Maintenance (TQMain), is introduced. It aims to make intensive use of the real-time data acquisition and analysis to detect causes behind product quality deviation and failures in machinery, and following defect development at an early stage to increase machine mean effective life and improve company`s economics. The effect of TQMain on LCC of machinery and company`s economics is discussed. A case study to reveal savings in maintenance cost when a vibration-based policy involved, is presented. Using TQMain, company`s economics can be improved effectively through continuous improvement of the technical and economic effectiveness of production processes. (orig.) 14 refs.

  6. Integrated vibration-based maintenance: an approach for continuous reduction in LCC. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Najjar, B. [ER Konsult Utveckling AB, Vaexjoe (Sweden)

    1998-12-31

    The biggest thread in achieving and maintaining high equipment effectiveness can be stated as: whether the improved manufacturing processes capable of producing quality products at a competitive cost. The effect of a new vibration-based maintenance concept, called Total Quality Maintenance (TQMain), is introduced. It aims to make intensive use of the real-time data acquisition and analysis to detect causes behind product quality deviation and failures in machinery, and following defect development at an early stage to increase machine mean effective life and improve company`s economics. The effect of TQMain on LCC of machinery and company`s economics is discussed. A case study to reveal savings in maintenance cost when a vibration-based policy involved, is presented. Using TQMain, company`s economics can be improved effectively through continuous improvement of the technical and economic effectiveness of production processes. (orig.) 14 refs.

  7. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  8. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  9. Reduction rules-based search algorithm for opportunistic replacement strategy of multiple life-limited parts

    Directory of Open Access Journals (Sweden)

    Xuyun FU

    2018-01-01

    Full Text Available The opportunistic replacement of multiple Life-Limited Parts (LLPs is a problem widely existing in industry. The replacement strategy of LLPs has a great impact on the total maintenance cost to a lot of equipment. This article focuses on finding a quick and effective algorithm for this problem. To improve the algorithm efficiency, six reduction rules are suggested from the perspectives of solution feasibility, determination of the replacement of LLPs, determination of the maintenance occasion and solution optimality. Based on these six reduction rules, a search algorithm is proposed. This search algorithm can identify one or several optimal solutions. A numerical experiment shows that these six reduction rules are effective, and the time consumed by the algorithm is less than 38 s if the total life of equipment is shorter than 55000 and the number of LLPs is less than 11. A specific case shows that the algorithm can obtain optimal solutions which are much better than the result of the traditional method in 10 s, and it can provide support for determining to-be-replaced LLPs when determining the maintenance workscope of an aircraft engine. Therefore, the algorithm is applicable to engineering applications concerning opportunistic replacement of multiple LLPs in aircraft engines.

  10. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  11. Basic Concept and Theoretical Study of Condition-based Maintenance for Power Transmission System

    Institute of Scientific and Technical Information of China (English)

    LIMing; HAN Xueshan; YANG Ming; GUO Zhihong

    2011-01-01

    The appropriate maintenance time for the single equipment can be found easily and efficiently under the background of condition-based maintenance. However, from the perspective of the whole power system, discrepancy between equipment individual and the whole power system would appear. Once this discrepancy can not be coordinated, it will certainly cause contradiction and conflict between individual equipment and the whole system, and lose the integral efficiency. To solve this contradiction and conflicts is of significant meaning.

  12. A belief-based evolutionarily stable strategy.

    Science.gov (United States)

    Deng, Xinyang; Wang, Zhen; Liu, Qi; Deng, Yong; Mahadevan, Sankaran

    2014-11-21

    As an equilibrium refinement of the Nash equilibrium, evolutionarily stable strategy (ESS) is a key concept in evolutionary game theory and has attracted growing interest. An ESS can be either a pure strategy or a mixed strategy. Even though the randomness is allowed in mixed strategy, the selection probability of pure strategy in a mixed strategy may fluctuate due to the impact of many factors. The fluctuation can lead to more uncertainty. In this paper, such uncertainty involved in mixed strategy has been further taken into consideration: a belief strategy is proposed in terms of Dempster-Shafer evidence theory. Furthermore, based on the proposed belief strategy, a belief-based ESS has been developed. The belief strategy and belief-based ESS can reduce to the mixed strategy and mixed ESS, which provide more realistic and powerful tools to describe interactions among agents. Copyright © 2014 Elsevier Ltd. All rights reserved.

  13. Automotive Maintenance Data Base for Model Years 1976-1979. Part I

    Science.gov (United States)

    1980-12-01

    An update of the existing data base was developed to include life cycle maintenance costs of representative vehicles for the model years 1976-1979. Repair costs as a function of time are also developed for a passenger car in each of the compact, subc...

  14. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  15. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  16. Utility based maintenance analysis using a Random Sign censoring model

    International Nuclear Information System (INIS)

    Andres Christen, J.; Ruggeri, Fabrizio; Villa, Enrique

    2011-01-01

    Industrial systems subject to failures are usually inspected when there are evident signs of an imminent failure. Maintenance is therefore performed at a random time, somehow dependent on the failure mechanism. A competing risk model, namely a Random Sign model, is considered to relate failure and maintenance times. We propose a novel Bayesian analysis of the model and apply it to actual data from a water pump in an oil refinery. The design of an optimal maintenance policy is then discussed under a formal decision theoretic approach, analyzing the goodness of the current maintenance policy and making decisions about the optimal maintenance time.

  17. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  18. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , and to sequential optimal decision making on planning of OM taking into account new information. Deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially......For offshore wind turbines, costs to operation and maintenance (OM) are substantial. This paper describes a risk-based life cycle approach for optimal planning of OM. The approach is based on pre-posterior Bayesian decision theory, and can be used both to overall, initial planning of OM...... in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  19. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    Science.gov (United States)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  20. Unsupervised Performance Evaluation Strategy for Bridge Superstructure Based on Fuzzy Clustering and Field Data

    Directory of Open Access Journals (Sweden)

    Yubo Jiao

    2013-01-01

    Full Text Available Performance evaluation of a bridge is critical for determining the optimal maintenance strategy. An unsupervised bridge superstructure state assessment method is proposed in this paper based on fuzzy clustering and bridge field measured data. Firstly, the evaluation index system of bridge is constructed. Secondly, a certain number of bridge health monitoring data are selected as clustering samples to obtain the fuzzy similarity matrix and fuzzy equivalent matrix. Finally, different thresholds are selected to form dynamic clustering maps and determine the best classification based on statistic analysis. The clustering result is regarded as a sample base, and the bridge state can be evaluated by calculating the fuzzy nearness between the unknown bridge state data and the sample base. Nanping Bridge in Jilin Province is selected as the engineering project to verify the effectiveness of the proposed method.

  1. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  2. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  3. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  4. Maintenance cost savings - snubber elimination with limit stops

    International Nuclear Information System (INIS)

    Monette, P.; Baltus, R.; Cloud, R.L.

    1995-01-01

    ''Active'' snubbers can be replaced with ''passive'' Limit Stops using two separate strategies. One is a straightforward piping re-analysis to optimize the number of dynamics supports and replace remaining snubbers with Limit Stops. A second approach is to take implicit advantage of the margins afforded by the ASME Code Case N-411 damping ratios and simply replace snubbers one-for-one with no re-analysis. Both methods result in major maintenance cost savings and both have been received favorably by the USNRC (United States Nuclear Regulatory Commission). Approaches to maintenance cost reduction using these strategies are discussed in this paper. (Author). 11 refs., 4 figs

  5. Quantified Risk Ranking Model for Condition-Based Risk and Reliability Centered Maintenance

    Science.gov (United States)

    Chattopadhyaya, Pradip Kumar; Basu, Sushil Kumar; Majumdar, Manik Chandra

    2017-06-01

    In the recent past, risk and reliability centered maintenance (RRCM) framework is introduced with a shift in the methodological focus from reliability and probabilities (expected values) to reliability, uncertainty and risk. In this paper authors explain a novel methodology for risk quantification and ranking the critical items for prioritizing the maintenance actions on the basis of condition-based risk and reliability centered maintenance (CBRRCM). The critical items are identified through criticality analysis of RPN values of items of a system and the maintenance significant precipitating factors (MSPF) of items are evaluated. The criticality of risk is assessed using three risk coefficients. The likelihood risk coefficient treats the probability as a fuzzy number. The abstract risk coefficient deduces risk influenced by uncertainty, sensitivity besides other factors. The third risk coefficient is called hazardous risk coefficient, which is due to anticipated hazards which may occur in the future and the risk is deduced from criteria of consequences on safety, environment, maintenance and economic risks with corresponding cost for consequences. The characteristic values of all the three risk coefficients are obtained with a particular test. With few more tests on the system, the values may change significantly within controlling range of each coefficient, hence `random number simulation' is resorted to obtain one distinctive value for each coefficient. The risk coefficients are statistically added to obtain final risk coefficient of each critical item and then the final rankings of critical items are estimated. The prioritization in ranking of critical items using the developed mathematical model for risk assessment shall be useful in optimization of financial losses and timing of maintenance actions.

  6. Structural maintenance planning based on historical data of corroded deck plates of tankers

    International Nuclear Information System (INIS)

    Garbatov, Y.; Guedes Soares, C.

    2009-01-01

    A probabilistic maintenance and repair analysis of tanker deck plates subjected to general corrosion is presented. The decisions about when to perform maintenance and repair on the structure are studied. Different practical scenarios are analyzed and optimum repair times are proposed. The optimum repair age and intervals are defined based on the statistical analysis of operational data using the Weibull model and some assumptions about the inspection and time needed for repair. The total cost is calculated in normalized form.

  7. Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains

    Science.gov (United States)

    Wang, Jiaxi; Wang, Huasheng; Wang, Zhongkai; Li, Jian; Lin, Ruixi; Xiao, Jie; Wu, Jianping

    2017-01-01

    This paper presents a 0–1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China’s high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers. PMID:28472097

  8. Ageing model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, S.; Sanchez, A.; Serradell, V.

    1998-01-01

    Nowadays, there is some doubt about building new Nuclear Power Plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components as a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions, both environmental and operational, of the equipment. This model may be used to support NPP life management and life extension programs by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters and very important differences are expected to appear under certain circumstance. (Author) 7 refs

  9. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  10. A Condition Based Maintenance Approach to Forecasting B-1 Aircraft Parts

    Science.gov (United States)

    2017-03-23

    Air Force Institute of Technology AFIT Scholar Theses and Dissertations 3-23-2017 A Condition Based Maintenance Approach to Forecasting B-1 Aircraft...component’s life history where reliability forecasts could be stipulated based on a component’s current condition . One of the major issues their report noted...Engine Condition Monitoring System Specification. Contract Number DOT-CG-80513-A. Grand Prairie, TX. Air Force Materiel Command. (2011) Requirements For

  11. Adaptation and Implementation of Predictive Maintenance Technique with Nondestructive Testing for Power Plants

    International Nuclear Information System (INIS)

    Jung, Gye Jo; Jung, Nam Gun

    2010-01-01

    Many forces are pressuring utilities to reduce operating and maintenance costs without cutting back on reliability or availability. Many utility managers are re-evaluating maintenance strategies to meet these demands. To utilities how to reduce maintenance costs and extent the effective operating life of equipment, predictive maintenance technique can be adapted. Predictive maintenance had three types program which are in-house program, engineering company program and mixed program. We can approach successful predictive maintenance program with 'smart trust' concept

  12. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  13. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  14. A risk-based model for maintenance decision support of civil structures using RAMS

    NARCIS (Netherlands)

    Viana Da Rocha, T. C.; Stipanovic, I.; Hartmann, A.; Bakker, J.

    2017-01-01

    As a cornerstone of transportation asset management, risk-based approaches have been used to support maintenance decisions of civil structures. However, ambiguous and subjective risk criteria and inconsistency on the use of risk-based approaches can lead to a fuzzy understanding of the risks

  15. Condition Based Maintenance of Space Exploration Vehicles Using Structural Health Monitoring, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies proposes to develop an autonomous and automated diagnostic system for condition based maintenance (CBM) of safety critical structures for space...

  16. Strategy for success in maintenance management at Point Lepreau nuclear generating station

    International Nuclear Information System (INIS)

    White, R.M.

    1987-01-01

    Improvements in availability of the station and in productivity of workers were achieved at Point Lepreau Nuclear Generating Station through implementation of a Maintenance Management System, which incorporates work planning and outage management techniques. Eight software systems on a VAX 11/70 minicomputer control work orders, temporary and permanent design changes, parts and material inventories, time keeping, and project management. All maintenance is coordinated through a regular planning meeting

  17. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  18. A mixed methods protocol for developing and testing implementation strategies for evidence-based obesity prevention in childcare: a cluster randomized hybrid type III trial.

    Science.gov (United States)

    Swindle, Taren; Johnson, Susan L; Whiteside-Mansell, Leanne; Curran, Geoffrey M

    2017-07-18

    Despite the potential to reach at-risk children in childcare, there is a significant gap between current practices and evidence-based obesity prevention in this setting. There are few investigations of the impact of implementation strategies on the uptake of evidence-based practices (EBPs) for obesity prevention and nutrition promotion. This study protocol describes a three-phase approach to developing and testing implementation strategies to support uptake of EBPs for obesity prevention practices in childcare (i.e., key components of the WISE intervention). Informed by the i-PARIHS framework, we will use a stakeholder-driven evidence-based quality improvement (EBQI) process to apply information gathered in qualitative interviews on barriers and facilitators to practice to inform the design of implementation strategies. Then, a Hybrid Type III cluster randomized trial will compare a basic implementation strategy (i.e., intervention as usual) with an enhanced implementation strategy informed by stakeholders. All Head Start centers (N = 12) within one agency in an urban area in a southern state in the USA will be randomized to receive the basic or enhanced implementation with approximately 20 classrooms per group (40 educators, 400 children per group). The educators involved in the study, the data collectors, and the biostastician will be blinded to the study condition. The basic and enhanced implementation strategies will be compared on outcomes specified by the RE-AIM model (e.g., Reach to families, Effectiveness of impact on child diet and health indicators, Adoption commitment of agency, Implementation fidelity and acceptability, and Maintenance after 6 months). Principles of formative evaluation will be used throughout the hybrid trial. This study will test a stakeholder-driven approach to improve implementation, fidelity, and maintenance of EBPs for obesity prevention in childcare. Further, this study provides an example of a systematic process to develop

  19. An All-Recombinant Protein-Based Culture System Specifically Identifies Hematopoietic Stem Cell Maintenance Factors

    Directory of Open Access Journals (Sweden)

    Aki Ieyasu

    2017-03-01

    Full Text Available Hematopoietic stem cells (HSCs are considered one of the most promising therapeutic targets for the treatment of various blood disorders. However, due to difficulties in establishing stable maintenance and expansion of HSCs in vitro, their insufficient supply is a major constraint to transplantation studies. To solve these problems we have developed a fully defined, all-recombinant protein-based culture system. Through this system, we have identified hemopexin (HPX and interleukin-1α as responsible for HSC maintenance in vitro. Subsequent molecular analysis revealed that HPX reduces intracellular reactive oxygen species levels within cultured HSCs. Furthermore, bone marrow immunostaining and 3D immunohistochemistry revealed that HPX is expressed in non-myelinating Schwann cells, known HSC niche constituents. These results highlight the utility of this fully defined all-recombinant protein-based culture system for reproducible in vitro HSC culture and its potential to contribute to the identification of factors responsible for in vitro maintenance, expansion, and differentiation of stem cell populations.

  20. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  1. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  2. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  3. University of Tennessee - Industry collaborative research and development in preventive maintenance technology

    International Nuclear Information System (INIS)

    Upadhyaya, B.R.

    1992-01-01

    The Preventive Maintenance Engineering Laboratory (PMEL) was inaugurated at the University of Tennessee Nuclear Engineering Department in September 1989. The startup funding was provided by Gilbert/Commonwealth, Inc. The purpose of PMEL is to identify maintenance-related problems in the power and process industries and to find their solutions through the development and application of emerging technologies. These include advanced digital signal processing, applied artificial intelligence (AI), artificial neural networks, and reliability based methods. The Laboratory activities are being expanded by the formation of an industrial consortium within the Measurement and Control Engineering Center at the University of Tennessee. Several research and development projects in preventive maintenance are being carried out. These include condition monitoring of air operated valves, automated diagnostics of motor operated valves, instrument calibration, verification, and estimation of expected residual life of electric motors using applied AI technology and reliability-based methods. The new methodology will be applied to other industrial subsystems. A long-term research and development project is being sponsored by the T.V.A. Nuclear Maintenance Department. The overall objective of the research program is to develop and apply advanced artificial intelligence and information processing methods to the problems of plant performance monitoring and preventive maintenance. The program includes the development of a workstation/PC-based, networking of plant information for easy access to operational and management personnel, implementation of a sensor verification system, monitoring of feedwater flow venturi fouling and heat rate balance, and integration of signal validation, command validation, and fault-tolerant control strategies

  4. Cost-effectiveness of continuation maintenance pemetrexed after cisplatin and pemetrexed chemotherapy for advanced nonsquamous non-small-cell lung cancer: estimates from the perspective of the Chinese health care system.

    Science.gov (United States)

    Zeng, Xiaohui; Peng, Liubao; Li, Jianhe; Chen, Gannong; Tan, Chongqing; Wang, Siying; Wan, Xiaomin; Ouyang, Lihui; Zhao, Ziying

    2013-01-01

    Continuation maintenance treatment with pemetrexed is approved by current clinical guidelines as a category 2A recommendation after induction therapy with cisplatin and pemetrexed chemotherapy (CP strategy) for patients with advanced nonsquamous non-small-cell lung cancer (NSCLC). However, the cost-effectiveness of the treatment remains unclear. We completed a trial-based assessment, from the perspective of the Chinese health care system, of the cost-effectiveness of maintenance pemetrexed treatment after a CP strategy for patients with advanced nonsquamous NSCLC. A Markov model was developed to estimate costs and benefits. It was based on a clinical trial that compared continuation maintenance pemetrexed therapy plus best supportive care (BSC) versus placebo plus BSC after a CP strategy for advanced nonsquamous NSCLC. Sensitivity analyses were conducted to assess the stability of the model. The model base case analysis suggested that continuation maintenance pemetrexed therapy after a CP strategy would increase benefits in a 1-, 2-, 5-, or 10-year time horizon, with incremental costs of $183,589.06, $126,353.16, $124,766.68, and $124,793.12 per quality-adjusted life-year gained, respectively. The most sensitive influential variable in the cost-effectiveness analysis was the utility of the progression-free survival state, followed by proportion of patients with postdiscontinuation therapy in both arms, proportion of BSC costs for PFS versus progressed survival state, and cost of pemetrexed. Probabilistic sensitivity analysis indicated that the cost-effective probability of adding continuation maintenance pemetrexed therapy to BSC was zero. One-way and probabilistic sensitivity analyses revealed that the Markov model was robust. Continuation maintenance of pemetrexed after a CP strategy for patients with advanced nonsquamous NSCLC is not cost-effective based on a recent clinical trial. Decreasing the price or adjusting the dosage of pemetrexed may be a better option

  5. The present status and future growth of maintenance in US manufacturing: results from a pilot survey.

    Science.gov (United States)

    Jin, Xiaoning; Siegel, David; Weiss, Brian A; Gamel, Ellen; Wang, Wei; Lee, Jay; Ni, Jun

    A research study was conducted (1) to examine the practices employed by US manufacturers to achieve productivity goals and (2) to understand what level of intelligent maintenance technologies and strategies are being incorporated into these practices. This study found that the effectiveness and choice of maintenance strategy were strongly correlated to the size of the manufacturing enterprise; there were large differences in adoption of advanced maintenance practices and diagnostics and prognostics technologies between small and medium-sized enterprises (SMEs). Despite their greater adoption of maintenance practices and technologies, large manufacturing organizations have had only modest success with respect to diagnostics and prognostics and preventive maintenance projects. The varying degrees of success with respect to preventative maintenance programs highlight the opportunity for larger manufacturers to improve their maintenance practices and use of advanced prognostics and health management (PHM) technology. The future outlook for manufacturing PHM technology among the manufacturing organizations considered in this study was overwhelmingly positive; many manufacturing organizations have current and planned projects in this area. Given the current modest state of implementation and positive outlook for this technology, gaps, future trends, and roadmaps for manufacturing PHM and maintenance strategy are presented.

  6. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  7. Evaluation of maintenance strategies for steam generator tubes in pressurized waster reactors. 2. Cost and profitability analyses

    International Nuclear Information System (INIS)

    Isobe, Y.; Sagisaka, M.; Yoshimura, S.; Yagawa, G.

    2000-01-01

    As an application of probabilistic fracture mechanics (PFM), risk-benefit analysis was carried out to evaluate maintenance activities of steam generator (SG) tubes used in pressurized water reactors (PWRs). The analysis was conducted for SG tubes made of Inconel 600, and Inconel 690 as well assuming its crack initiation and crack propagation law based on Inconel 600 data. The following results were drawn from the analysis. Improvement of inspection accuracy reduces the maintenance costs significantly and is preferable from the viewpoint of profitability due to reduction of SG tube leakage and rupture. There is a certain region of SCC properties of SG tubes where sampling inspection is effective. (author)

  8. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  9. Improvement of testing and maintenance based on fault tree analysis

    International Nuclear Information System (INIS)

    Cepin, M.

    2000-01-01

    Testing and maintenance of safety equipment is an important issue, which significantly contributes to safe and efficient operation of a nuclear power plant. In this paper a method, which extends the classical fault tree with time, is presented. Its mathematical model is represented by a set of equations, which include time requirements defined in the house event matrix. House events matrix is a representation of house events switched on and off through the discrete points of time. It includes house events, which timely switch on and off parts of the fault tree in accordance with the status of the plant configuration. Time dependent top event probability is calculated by the fault tree evaluations. Arrangement of components outages is determined on base of minimization of mean system unavailability. The results show that application of the method may improve the time placement of testing and maintenance activities of safety equipment. (author)

  10. Improvement of condition-based maintenance technology by utilization of thermography

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2004-01-01

    In the United States, condition-based maintenance technology comprising IR thermography (hereafter ''thermography'' for short) has been regarded in recent years as the established means for effectively improvement the performance of accident-preventive measures for nuclear power stations. As very few nuclear power plants in Japan have been utilizing the technology, measures for allowing power station personnel to use the technology with ease have been studied on an empirical basis. First, in view of improving the measuring efficiency to determine temperatures more accurately with a single measurement, principal factors affecting the measured temperature values have been analyzed. As a result, it has been found effective for accurate temperature measurement to make use of the table to radiation rates that have been determined for each facility coating specification by using a black body tape and to determine the measuring spot by avoiding rear heat sources (influence of reflection ratio) and background noise (influence of scattered light). Concurrently, as a result of determining the IR attenuation in the atmosphere, thermographic measurement has been found feasible without any significant attenuation as long as the distance is below 10 meters. Further, every power station facility (mainly electrical facilities) that is immune to thermography has been identified. These study results have been documented in the form of the ''Thermography Measurement Manual'' by also including in it the descriptions on abnormal thermal images and the judgment criteria at elevated temperatures that have been used in the United States. Based on these accomplishments, condition-based maintenance technology employing thermography has been applied to on-site investigation of nuclear power stations, and the effectiveness of thermography-aided accident-prevention has been demonstrated by detecting locally temperature rising spots of power cable joints. Moreover, with respect to maintenance

  11. Principles of marketing: Setting goals and marketing strategies

    OpenAIRE

    Marjanova Jovanov, Tamara

    2015-01-01

    Presented material to the students: 6.1. The mission of the organization and corporate goals 6.2. Marketing goals 6.3. Classification of marketing strategies 6.4. Generic marketing strategies regarding the wanted competitive advantage. 6.5. Competitive strategies in relation to the competitors and in relation to the environment. 6.6. Growth strategies or investment (intensive growth and integration / diversification) and maintenance strategies or divest (maintenance, harvest...

  12. Research and development strategy and maintenance engineering to strengthen the basis of ageing management

    International Nuclear Information System (INIS)

    Sekimura, Naoto

    2006-01-01

    The major research and development fields for ageing management of complex systems such as nuclear power plants are categorized into the following 4 items; 1) research and development of technologies for inspection, evaluation and repair in the components and materials, 2) engineering information systems, 3) development of codes and standards and 4) synthesized maintenance engineering. The 'synthesized maintenance engineering' field includes methodologies for optimum combination for inspection, maintenance actions and cost, definition of importance of components for maintenance, and performance indicates of a power plant system. Studying and learning these systematic approaches is also indicated in the Road Map as one of the important issues for collaboration of industries, regulatory bodies and universities to keep leading engineers and to improve regulatory systems. (author)

  13. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  14. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  15. Partial maintenance of auditory-based cognitive training benefits in older adults

    Science.gov (United States)

    Anderson, Samira; White-Schwoch, Travis; Choi, Hee Jae; Kraus, Nina

    2014-01-01

    The potential for short-term training to improve cognitive and sensory function in older adults has captured the public’s interest. Initial results have been promising. For example, eight weeks of auditory-based cognitive training decreases peak latencies and peak variability in neural responses to speech presented in a background of noise and instills gains in speed of processing, speech-in-noise recognition, and short-term memory in older adults. But while previous studies have demonstrated short-term plasticity in older adults, we must consider the long-term maintenance of training gains. To evaluate training maintenance, we invited participants from an earlier training study to return for follow-up testing six months after the completion of training. We found that improvements in response peak timing to speech in noise and speed of processing were maintained, but the participants did not maintain speech-in-noise recognition or memory gains. Future studies should consider factors that are important for training maintenance, including the nature of the training, compliance with the training schedule, and the need for booster sessions after the completion of primary training. PMID:25111032

  16. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  17. The business case for condition-based maintenance: a hybrid (non-) financial approach

    NARCIS (Netherlands)

    Tiddens, W.W.; Tinga, T.; Braaksma, A.J.J.; Brouwer, O.; Cepin, Marko; Bris, Radim

    2017-01-01

    Although developing business cases is key for evaluating project success, the costs and benefits of condition-based maintenance (CBM) implementations are often not explicitly defined and evaluated. Using the design science methodology, we developed a hybrid business case approach to help managers

  18. Development and Implementation of a Condition Based Maintenance Program for Geothermal Power Plants; FINAL

    International Nuclear Information System (INIS)

    Steve Miller; Jim Eddy; Murray Grande; Shawn Bratt; Manuchehr Shirmohamadi

    2002-01-01

    This report describes the development of the RCM team, identifying plant assets and developing an asset hierarchy, the development of sample Failure Mode Effects Analysis (FMEAs), identifying and prioritizing plant systems and components for RCM analysis, and identifying RCM/CBM software/hardware vendors. It also includes the Failure Mode Effects Analysis (FMEA) for all Class I Systems, Maintenance Task Assignments, use of Conditioned Based Maintenance (CBM) Tools and Displays of the RCM software System Development to date

  19. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  20. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  1. APPLICATION OF ROUGH SET THEORY TO MAINTENANCE LEVEL DECISION-MAKING FOR AERO-ENGINE MODULES BASED ON INCREMENTAL KNOWLEDGE LEARNING

    Institute of Scientific and Technical Information of China (English)

    陆晓华; 左洪福; 蔡景

    2013-01-01

    The maintenance of an aero-engine usually includes three levels ,and the maintenance cost and period greatly differ depending on the different maintenance levels .To plan a reasonable maintenance budget program , airlines would like to predict the maintenance level of aero-engine before repairing in terms of performance parame-ters ,which can provide more economic benefits .The maintenance level decision rules are mined using the histori-cal maintenance data of a civil aero-engine based on the rough set theory ,and a variety of possible models of upda-ting rules produced by newly increased maintenance cases added to the historical maintenance case database are in-vestigated by the means of incremental machine learning .The continuously updated rules can provide reasonable guidance suggestions for engineers and decision support for planning a maintenance budget program before repai-ring .The results of an example show that the decision rules become more typical and robust ,and they are more accurate to predict the maintenance level of an aero-engine module as the maintenance data increase ,which illus-trates the feasibility of the represented method .

  2. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  3. Age-dependent reliability model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, Sebastian; Sanchez, Ana; Serradell, Vicente

    1999-01-01

    Nowadays, there is some doubt about building new nuclear power plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation, where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components, which, in turn, is a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions of the equipment, both environmental and operational. This model may be used to support NPP life management and life extension programs, by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the example application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters. Then, very important differences are expected to appear under certain circumstances, particularly, in comparison with other models that do not consider maintenance effectiveness and working conditions simultaneously

  4. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  5. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  6. ON THE NECESSITY OF CHANGES IN THE STRATEGY OF UTILIZATION SHIP BOILER TECHNICAL CONDITION MAINTENANCE IN THE ASPECT OF LNG APPLIED AS FUEL

    Directory of Open Access Journals (Sweden)

    Andrzej ADAMKIEWICZ

    2017-01-01

    Full Text Available Heavy oils (HFO fuels used on ships play a part in degradation of technical condition of heat exchange surfaces of utiliza-tion boilers especially on the exhaust gas side. Presence of sulphur in these fuels is the main factor favouring degrada-tion. The upper limit for sulphur content in the fuel used outside the SECA areas equal to 3.5% is currently in force, at least until the year 2020 or 2025. The recommended by classification societies overhauls of utilization boilers are, there-fore characterized by a specially chosen strategy thanks to which it is possible to maintain their appropriate technical condition. The requirement to use fuels with low sulphur content (LSFO, which are significantly more expensive than MDO fuels, in the areas of controlled sulphur emissions also led to a further introduction of alternative fuels, such as methanol and above all liquefied natural gas (LNG, onto ships. That is especially valid for the ship owners whose vessels e.g. ferries sail mainly within SCECA This article analyses the consequences of the introduced fuel change on utilization boiler maintenance. A change in the technical condition maintenance strategy for utilization boilers has been suggested.

  7. Mathematical thinking of maintenance. Problem setting and solving bases

    International Nuclear Information System (INIS)

    2007-01-01

    Plant or mechanical facility for maintenance became more complicated than before and consisted of many subsystems made of various equipments or facilities with parts, which were a system having complicated and hierarchical structure. Maintenance was required to be properly implemented to assure reliability of a system for a long period so as for each equipment to play a specified role for a stable operation of plant. Mathematical thinking using probability theory was rational to optimize maintenance action with failure rate function of system or part of equipment. Reliability function, maintainability function and availability of plant and equipment were defined. Unreliability function was called failure time distribution function (F(t)) and failure rate function (λ(t)) was defined as the ratio of failure time density distribution function (dF(t)/dt) to reliability function (1-F(t)). λ(t) could be expressed as a simple equation with Weibull parameter. Availability at steady state was attributed to ratio of average operating time to sum of operating time and maintenance time, i.e. MTBF/(MTBF+MTTR) where MTBF was mean time between failures and MTTR was mean time to repair. Optimization of system risk and maintenance action was encouraged using computational science simulating material degradation. (T. Tanaka)

  8. NPP component maintenance and life management in Russia

    International Nuclear Information System (INIS)

    Tutnov, I.; Lyssakov, V.

    2002-01-01

    This report represents the conceptual strategies (ideas) on life management programs for nuclear power plants. Use of the optimum programs for NPP's NDE, maintenance service, operation and service life can provide the best economic benefit for the utilities. The paper presents general approaches to life management, maintenance service, and risks of operating and service life of NPPs in Russia. The report offers some optimized ways for the solution of these important tasks

  9. A Tailored Ontology Supporting Sensor Implementation for the Maintenance of Industrial Machines

    Directory of Open Access Journals (Sweden)

    Elaheh Maleki

    2017-09-01

    Full Text Available The longtime productivity of an industrial machine is improved by condition-based maintenance strategies. To do this, the integration of sensors and other cyber-physical devices is necessary in order to capture and analyze a machine’s condition through its lifespan. Thus, choosing the best sensor is a critical step to ensure the efficiency of the maintenance process. Indeed, considering the variety of sensors, and their features and performance, a formal classification of a sensor’s domain knowledge is crucial. This classification facilitates the search for and reuse of solutions during the design of a new maintenance service. Following a Knowledge Management methodology, the paper proposes and develops a new sensor ontology that structures the domain knowledge, covering both theoretical and experimental sensor attributes. An industrial case study is conducted to validate the proposed ontology and to demonstrate its utility as a guideline to ease the search of suitable sensors. Based on the ontology, the final solution will be implemented in a shared repository connected to legacy CAD (computer-aided design systems. The selection of the best sensor is, firstly, obtained by the matching of application requirements and sensor specifications (that are proposed by this sensor repository. Then, it is refined from the experimentation results. The achieved solution is recorded in the sensor repository for future reuse. As a result, the time and cost of the design process of new condition-based maintenance services is reduced.

  10. A Tailored Ontology Supporting Sensor Implementation for the Maintenance of Industrial Machines.

    Science.gov (United States)

    Maleki, Elaheh; Belkadi, Farouk; Ritou, Mathieu; Bernard, Alain

    2017-09-08

    The longtime productivity of an industrial machine is improved by condition-based maintenance strategies. To do this, the integration of sensors and other cyber-physical devices is necessary in order to capture and analyze a machine's condition through its lifespan. Thus, choosing the best sensor is a critical step to ensure the efficiency of the maintenance process. Indeed, considering the variety of sensors, and their features and performance, a formal classification of a sensor's domain knowledge is crucial. This classification facilitates the search for and reuse of solutions during the design of a new maintenance service. Following a Knowledge Management methodology, the paper proposes and develops a new sensor ontology that structures the domain knowledge, covering both theoretical and experimental sensor attributes. An industrial case study is conducted to validate the proposed ontology and to demonstrate its utility as a guideline to ease the search of suitable sensors. Based on the ontology, the final solution will be implemented in a shared repository connected to legacy CAD (computer-aided design) systems. The selection of the best sensor is, firstly, obtained by the matching of application requirements and sensor specifications (that are proposed by this sensor repository). Then, it is refined from the experimentation results. The achieved solution is recorded in the sensor repository for future reuse. As a result, the time and cost of the design process of new condition-based maintenance services is reduced.

  11. Probabilistic analysis of free ways for maintenance

    International Nuclear Information System (INIS)

    Torres V, A.; Rivero O, J.J.

    2004-01-01

    The safety during the maintenance interventions is treated in limited manner and in general independent of the systems of management of the maintenance. This variable is affected by multiple technical or human factors many times subjective and difficult to quantifying, what limits the design of preventive plans. However, some factors constitute common points: the isolation configurations during the free ways (bank drafts in the oil industry) and the human errors associated to their violation. This characteristic allowed to develop the analysis of such situations through the methodology of fault trees that it links faults of teams and human errors cohesively. The methodology has been automated inside the MOSEG Win Ver 1.0 code and the same one can embrace from the analysis of a particular situation of free way until that of a complete strategy of maintenance from the point of view of the safety of the maintenance personal. (Author)

  12. Operation and maintenance of waste incinerators - A comparison of two techniques and strategies; Drift och underhaall av avfallsfoerbraenningsanlaeggningar - En jaemfoerelse av tvaa tekniker och strategier

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Andreas [SP Technical Research Inst. of Sweden, Boraas (Sweden); Hoegskolan i Boraas, Boraas (Sweden); Niklasson, Fredrik [SP Technical Research Inst. of Sweden, Boraas (Sweden); Johnsson, Anders [Boraas Energi och Miljoe, Boraas (Sweden); Fredaeng, Julia [Dalkia, Stockholm (Sweden); Wettergren, Hans [Renova AB, Goeteborg (Sweden)

    2009-06-15

    This work has developed and demonstrated a simple method for comparison of operation and maintenance cost for various waste combustion techniques and plants. The principal of the method is to coarsely and initially divide cost into comparable posts. Post of specific interest is thereafter compared on a more detailed level. This procedure allows comparison with a modest consumption of time and effort. There is a lack of such comparison because of the effort needed to in detail compare the, often for each plant unique, selection of techniques and strategies. A consequence of the lack of comparisons is that success stories become invisible. The same can be said about common research needs. The demonstrated method visualizes the effects of various selections of techniques and strategies. It also points out bottlenecks for further improvement of the investigated units. The method has been simple to use and it is therefore considered as suitable to use in a larger investigation covering several waste combustion units. Thus, the project has accomplished its aims.

  13. Remote maintenance of future fusion reactors - a challenge for rad-hard components and smart control strategies

    International Nuclear Information System (INIS)

    Decreton, M.; Geeter, J. De

    1996-01-01

    The future fusion reactor will need frequent maintenance turns, involving inspection, repair and parts replacement inside the vacuum vessel. These operations will require high payload manipulations in constrained space under very high gamma-radiation dose-rates and temperature. Present research is being undertaken to qualify the components of the handling machine under representative conditions, in the framework of the ITER international consortium. Simultaneously, challenging control strategies will be needed to achieve reliable tasking under very poor viewing conditions and elementary sensing help. The paper reviews the present state of the art on both issues and present results of the ongoing research themes among the partners of the ITER programme. In particular, SCK''centre-dot''CEN coordinates the ITER T252 task on Radiation Tolerance Assessment of Remote Handling Components. (UK)

  14. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  15. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  16. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  17. Preventive maintenance scheduling by variable dimension evolutionary algorithms

    International Nuclear Information System (INIS)

    Limbourg, Philipp; Kochs, Hans-Dieter

    2006-01-01

    Black box optimization strategies have been proven to be useful tools for solving complex maintenance optimization problems. There has been a considerable amount of research on the right choice of optimization strategies for finding optimal preventive maintenance schedules. Much less attention is turned to the representation of the schedule to the algorithm. Either the search space is represented as a binary string leading to highly complex combinatorial problem or maintenance operations are defined by regular intervals which may restrict the search space to suboptimal solutions. An adequate representation however is vitally important for result quality. This work presents several nonstandard input representations and compares them to the standard binary representation. An evolutionary algorithm with extensions to handle variable length genomes is used for the comparison. The results demonstrate that two new representations perform better than the binary representation scheme. A second analysis shows that the performance may be even more increased using modified genetic operators. Thus, the choice of alternative representations leads to better results in the same amount of time and without any loss of accuracy

  18. PSO Based Optimization of Testing and Maintenance Cost in NPPs

    Directory of Open Access Journals (Sweden)

    Qiang Chou

    2014-01-01

    Full Text Available Testing and maintenance activities of safety equipment have drawn much attention in Nuclear Power Plant (NPP to risk and cost control. The testing and maintenance activities are often implemented in compliance with the technical specification and maintenance requirements. Technical specification and maintenance-related parameters, that is, allowed outage time (AOT, maintenance period and duration, and so forth, in NPP are associated with controlling risk level and operating cost which need to be minimized. The above problems can be formulated by a constrained multiobjective optimization model, which is widely used in many other engineering problems. Particle swarm optimizations (PSOs have proved their capability to solve these kinds of problems. In this paper, we adopt PSO as an optimizer to optimize the multiobjective optimization problem by iteratively trying to improve a candidate solution with regard to a given measure of quality. Numerical results have demonstrated the efficiency of our proposed algorithm.

  19. Cost effectiveness of the MDOT preventive maintenance program.

    Science.gov (United States)

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  20. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  1. Maintenance methods: Development, Trends and Recommendations[M]; Underhaallsmetoder: Utveckling, Trender och Rekommendationer

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Johan; Sonden, Mikael; Haegg, Maria; Johansson, Bernt Aake; Johansson, Mikael; Aagren, Karoline; Gunnarsson, Haakan; Sandin, Paer

    2006-12-15

    Vaermeforsk has an ambition to map the maintenance management area to improve its decision support to plant owners and increase the level of knowledge in the energy sector. Thus, Inspecta Technology, Fortum and Systecon have been given the task to perform a project with the expressed objectives to: describe the general knowledge level in other sectors of the industry and how the use of improvement methods contributes to the plant reliability; illustrate and recommend improvement methods applicable in the energy industry; and to identify further need for development and make priorities. The project is performed in three steps. The first consists of an inventory of existing methods and strategies. The starting point has been the typical problems you face in the maintenance field. It turns out that there are numerous examples of successful approaches used in other sectors of industry. The next step is an enquiry to describe current status in the energy sector. 21 plants were included in this study and it points out a need both for specific analysis methods and more general strategies for maintenance management. The result from both inventory and enquiry forms the base for development of the guide. The guide is structured from the identified problem areas but also from a notional maintenance process. To improve the basis for Vaermeforsk's priorities, a number of possible development areas are proposed, such as the development of standard performance indicators, pilot projects to emphasize the use of analytical methods and in some cases further development of methods for use within the energy sector.

  2. Maintenance methods: Development, Trends and Recommendations[M]; Underhaallsmetoder: Utveckling, Trender och Rekommendationer

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Johan; Sonden, Mikael; Haegg, Maria; Johansson, Bernt Aake; Johansson, Mikael; Aagren, Karoline; Gunnarsson, Haakan; Sandin, Paer

    2006-12-15

    Vaermeforsk has an ambition to map the maintenance management area to improve its decision support to plant owners and increase the level of knowledge in the energy sector. Thus, Inspecta Technology, Fortum and Systecon have been given the task to perform a project with the expressed objectives to: describe the general knowledge level in other sectors of the industry and how the use of improvement methods contributes to the plant reliability; illustrate and recommend improvement methods applicable in the energy industry; and to identify further need for development and make priorities. The project is performed in three steps. The first consists of an inventory of existing methods and strategies. The starting point has been the typical problems you face in the maintenance field. It turns out that there are numerous examples of successful approaches used in other sectors of industry. The next step is an enquiry to describe current status in the energy sector. 21 plants were included in this study and it points out a need both for specific analysis methods and more general strategies for maintenance management. The result from both inventory and enquiry forms the base for development of the guide. The guide is structured from the identified problem areas but also from a notional maintenance process. To improve the basis for Vaermeforsk's priorities, a number of possible development areas are proposed, such as the development of standard performance indicators, pilot projects to emphasize the use of analytical methods and in some cases further development of methods for use within the energy sector.

  3. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  4. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  5. Maintenance of neural progenitor cell stemness in 3D hydrogels requires matrix remodelling

    Science.gov (United States)

    Madl, Christopher M.; Lesavage, Bauer L.; Dewi, Ruby E.; Dinh, Cong B.; Stowers, Ryan S.; Khariton, Margarita; Lampe, Kyle J.; Nguyen, Duong; Chaudhuri, Ovijit; Enejder, Annika; Heilshorn, Sarah C.

    2017-12-01

    Neural progenitor cell (NPC) culture within three-dimensional (3D) hydrogels is an attractive strategy for expanding a therapeutically relevant number of stem cells. However, relatively little is known about how 3D material properties such as stiffness and degradability affect the maintenance of NPC stemness in the absence of differentiation factors. Over a physiologically relevant range of stiffness from ~0.5 to 50 kPa, stemness maintenance did not correlate with initial hydrogel stiffness. In contrast, hydrogel degradation was both correlated with, and necessary for, maintenance of NPC stemness. This requirement for degradation was independent of cytoskeletal tension generation and presentation of engineered adhesive ligands, instead relying on matrix remodelling to facilitate cadherin-mediated cell-cell contact and promote β-catenin signalling. In two additional hydrogel systems, permitting NPC-mediated matrix remodelling proved to be a generalizable strategy for stemness maintenance in 3D. Our findings have identified matrix remodelling, in the absence of cytoskeletal tension generation, as a previously unknown strategy to maintain stemness in 3D.

  6. Conceptual design of in-service inspection and maintenance for KALIMER

    International Nuclear Information System (INIS)

    Ju, Y. S.; Kim, S. H.; Koo, K. H.; You, B.

    1999-01-01

    In-service inspection and maintenance are very important for the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this paper the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the Section XI, Division 3, of ASME code and considering the design characteristics of KALIMER

  7. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy : final report.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  8. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability

    International Nuclear Information System (INIS)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu

    1999-01-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  9. A decentralized multidistrict optimization framework for system-wide pavement maintenance resource allocation

    Directory of Open Access Journals (Sweden)

    J. Farhan

    2016-05-01

    Full Text Available Historically, pavement maintenance funds have been allocated based on a centralized programme development process. Such practice, though seemingly convenient, does not lead to optimal allocation of funds since districts generally have different priorities based on the state of development and condition of their respective road networks. This paper proposes a decentralized two-phased optimization framework for pavement maintenance fund allocation considering multiple objectives and cross-district trade-off at the network level. In the proposed two-phased analysis approach, Phase-I focuses on establishing the needs and funds requirements of individual districts given multiple performance targets or objectives, while a system-wide fund appropriation strategy is selected, in Phase-II, given budget and equity constraints across competing districts. The proposed approach is illustrated using a numerical example problem for appropriating funds to three districts. The results indicated that the proposed approach is not only able to evaluate the extent to which various performance targets are achieved at the central and district level, but also maintains equity in distribution of financial resources across districts. Keywords: Pavement maintenance programming, Multiobjective, Multidistrict, Optimized resource allocation, Genetic algorithm, Dynamic programming

  10. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  11. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  12. Performance-based maintenance procurement by Dutch housing associations - Working paper ¿

    NARCIS (Netherlands)

    Straub, A.; van Mossel, H.J.

    2005-01-01

    Maintenance works are component services that are part of the final housing service to the tenant. Because main building maintenance works are designed each time again, it can be compared to product (service) development. With different types of cooperation with maintenance contractors, the degree

  13. Optimization potential in maintenance; Optimierungspotenzial in der Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Janisch, H. [EnBW Kraftwerke AG, Kernkraftwerk Philippsburg (Germany)

    2001-04-01

    Also in the future, the supreme goal of nuclear power plant operation is going to be plant safety. At the same time, the economic component must be taken into account, which has become more important as a consequence of the deregulation in the electricity market. Until now, the electricity generating costs in nuclear power plants have been optimized by increases in electricity generation, and by high plant availabilities in terms of time and capacity. However, these capacity-based influences on the generating costs practically have been exploited to the full extent possible because of the high plant reliability reached. This makes the cost term the focal point in all optimization efforts, i.e. in existing nuclear power plants especially the maintenance costs. At the present high level of safety, which is going to develop even further, growing operating experience will allow a change to be made from preventive maintenance to cost-optimized state-oriented maintenance strategies. Other measures of advanced maintenance strategies are seen in the fields of work organization, personnel management, and personnel and plant use planning for more than one site. Important components in this effort are IT-based plant management systems allowing the complex problems to be planned, executed, controlled, and analyzed. All these measures serve to allow the operation of nuclear power plants at an even higher level of optimization, maximum safety in line with the state of the art, and demonstrably competitive electricity generating costs. (orig.) [German] Oberstes Ziel des Betriebs von Kernkraftwerken wird auch in Zukunft uneingeschraenkt deren Sicherheit sein, bei gleichzeitiger Beruecksichtigung der durch die Liberalisierung des Strommarktes bedeutungsvoller gewordenen wirtschaftlichen Komponente. Bislang wurden die Erzeugungskosten in Kernkraftwerken durch Erhoehung der Stromerzeugungsleistung und durch hohe Zeit- und Arbeitsverfuegbarkeiten optimiert. Auf Grund der erreichten

  14. Sustainable resilience in property maintenance: encountering changing weather conditions

    DEFF Research Database (Denmark)

    Cox, Rimante Andrasiunaite; Nielsen, Susanne Balslev

    2014-01-01

    Purpose: The purpose of the study is to develop a methodological approach for project management to integrate sustainability and resilience planning in property maintenance as an incremental strategy for upgrading existing properties to meet new standards for sustainable and climate resilient...... buildings. Background: Current maintenance practice is focused on the technical standard of buildings, with little consideration of sustainability and resilience. There is a need to develop tools for incorporating sustainable resilience into maintenance planning. Approach: The study is primarily theoretical......, developing the concept of sustainable resilience for changing weather conditions Results: The paper suggests a decision support methodology that quantifies sustainable resilience for the analytical stages of property maintenance planning. Practical Implications: The methodology is generic and expected users...

  15. Optimisation of maintenance in electric power grids; Optimierung der Instandhaltung in elektrischen Netzen

    Energy Technology Data Exchange (ETDEWEB)

    Jeromin, Ingo [Mainova AG, Frankfurt am Main (Germany); Balzer, Gerd [Technische Univ. Darmstadt (Germany). Forschungsgruppe Elektrische Energieversorgung

    2012-10-15

    During the past few years, the regulation efforts in power supply resulted in structuring of maintenance and replacement of operating facilities. Activities in this field are summarized under the heading of asset management. Investigations so far tended to focus on maintenance strategies and neglected the financial aspect, i.e. the total cost of a grid with different groups of operating facilities. The authors show strategies for solving this central problem of asset management.

  16. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  17. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Science.gov (United States)

    2010-10-01

    ... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... the design level of safety and reliability of the equipment; (2) To restore safety and reliability to...

  18. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  19. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    Energy Technology Data Exchange (ETDEWEB)

    Dewan, Ashish; Stehly, Tyler

    2017-06-22

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  20. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)