WorldWideScience

Sample records for maintenance project phases

  1. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  2. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  3. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  4. Fuel Rod Consolidation Project: Phase 2, Final report: Volume 5, Operations and maintenance manual

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this manual is to describe the function, installation, operation and maintenance of the Fuel Rod Consolidation System. This Document is preliminary and must be updated to incorporate any modifications to the mechanical and electrical systems that are performed during construction. Any changes and specific references related to the software requirements will be provided as the software is developed in Phase III. Setpoints related to equipment positions as a function of resolver and position transducer readings will also be provided in Phase III. References such as vendor supplied Operating and Maintenance Manuals for vendor components and assemblies are not available until a receipt of a purchase order. These references will become an integral part of this manual during the construction phase

  5. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  6. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  7. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  8. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Harlou, Ulf; Haug, Anders

    2008-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  9. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Hvam, Lars; Harlou, Ulf

    2011-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  10. Energy efficient maintenance. Project report; Energioptimerende vedligehold. Projektrapport

    Energy Technology Data Exchange (ETDEWEB)

    Bjerg, J. (Center for Drift og Vedligehold, Frederici (Denmark)); Dam Wied, M.; Skjershede Nielsen, P.; Holt, J. (NRGi Raadgivning A/S, Aarhus (Denmark)); Dam, M. (Energi Horsens, Horsens (Denmark)); Holk Lauridsen, V. (Teknologisk Institut, Energieffektivisering og Ventilation, Taastrup (Denmark))

    2010-03-15

    Together with four case companies, the project developed and tested a model for energy-efficient maintenance. In each of the companies, the model was adjusted through a cooperation process aiming at combining energy optimisation and maintenance as part of specific production optimisation. When correctly planned, energy-efficient maintenance is interesting for all companies. An overall solution was made, which can facilitate major energy savings and production efficiency improvement. (LN)

  11. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  12. Criteria Document for B-plant's Surveillance and Maintenance Phase Safety Basis Document

    International Nuclear Information System (INIS)

    SCHWEHR, B.A.

    1999-01-01

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S and M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S and M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S and M Phase safety basis document

  13. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  14. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  15. Maintenance of Traffic for Innovative Geometric Design Work Zones

    Science.gov (United States)

    2015-12-01

    Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The res...

  16. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  17. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  18. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Science.gov (United States)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  19. Human Factors in Aviation Maintenance. Phase 1

    Science.gov (United States)

    1991-11-01

    solution is war- more effe-ctive use of human resoUrecs , the neat step Ls to ane- uassol o efogte.S a hr sn tes te de. Af piot progfctram can...and Subtitle 5. Report Date November 1991 Human Factors in Aviation Maintenance - Phase One Progress Report 6. Perfarng Oon z’on Code i8. Perfo-rrng...Independence Avenue, SW 14. Sponsor,mg Agency Code Washington, DC 20591 15. Supplementary Notes 16. Abstract "• This human factors research in aviation

  20. Design of the randomized, Phase III, QUAZAR AML Maintenance trial of CC-486 (oral azacitidine) maintenance therapy in acute myeloid leukemia.

    Science.gov (United States)

    Roboz, Gail J; Montesinos, Pau; Selleslag, Dominik; Wei, Andrew; Jang, Jun-Ho; Falantes, Jose; Voso, Maria T; Sayar, Hamid; Porkka, Kimmo; Marlton, Paula; Almeida, Antonio; Mohan, Sanjay; Ravandi, Farhad; Garcia-Manero, Guillermo; Skikne, Barry; Kantarjian, Hagop

    2016-02-01

    Older patients with acute myeloid leukemia (AML) have worse rates of complete remission and shorter overall survival than younger patients. The epigenetic modifier CC-486 is an oral formulation of azacitidine with promising clinical activity in patients with AML in Phase I studies. The Phase III, randomized, double-blind, placebo-controlled QUAZAR AML Maintenance trial (CC-486-AML-001) examines CC-486 maintenance therapy (300 mg/day for 14 days of 28-day treatment cycles) for patients aged ≥55 years with AML in first complete remission. The primary end point is overall survival. Secondary end points include relapse-free survival, safety, health-related quality of life and healthcare resource utilization. This trial will investigate whether CC-486 maintenance can prolong remission and improve survival for older patients with AML.

  1. Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling

    Science.gov (United States)

    Fryling, Meg

    2010-11-01

    Organisations often make implementation decisions with little consideration for the maintenance phase of an enterprise resource planning (ERP) system, resulting in significant recurring maintenance costs. Poor cost estimations are likely related to the lack of an appropriate framework for enterprise-wide pre-packaged software maintenance, which requires an ongoing relationship with the software vendor (Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4), 42-46). The end result is that critical project decisions are made with little empirical data, resulting in substantial long-term cost impacts. The product of this research is a formal dynamic simulation model that enables theory testing, scenario exploration and policy analysis. The simulation model ERPMAINT1 was developed by combining and extending existing frameworks in several research domains, and by incorporating quantitative and qualitative case study data. The ERPMAINT1 model evaluates tradeoffs between different ERP project management decisions and their impact on post-implementation total cost of ownership (TCO). Through model simulations a variety of dynamic insights were revealed that could assist ERP project managers. Major findings from the simulation show that upfront investments in mentoring and system exposure translate to long-term cost savings. The findings also indicate that in addition to customisations, add-ons have a significant impact on TCO.

  2. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    Science.gov (United States)

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  3. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  4. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  5. Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405

    International Nuclear Information System (INIS)

    Strehlow, M.W.B.

    1994-01-01

    During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950's. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating to maintenance activities, storage areas, and personnel support services. This sub-project will also resolve outstanding findings and/or deficiencies relating to building fire protection, HVAC requirements, lighting replacement/upgrades, and personnel facilities. Compliance with building codes, local labor agreements and safety standards will result

  6. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  7. Two Innovative Steps for Training on Maintenance: 'VIRMAN' Spanish Project based on Virtual Reality 'STARMATE' European Project based on Augmented Reality

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco

    2002-01-01

    This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up the procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual

  8. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  9. Military Family Coping Project - Phase II

    Science.gov (United States)

    2015-05-01

    Anxiety, Life Satisfaction , Addiction, Trauma 4 The Military Family Coping Project reflects two phases. The first consisted of a series of focus...need for and guided the work of the Military Family Coping Project Phase II funded by TATRC. The Military Family Coping Project Phase II was...solidarity. For the purposes of family functioning analyses, married and unmarried soldiers were analyzed separately because marital status affects

  10. Guidelines for Remote Handling Maintenance of ITER Neutral Beam Components

    International Nuclear Information System (INIS)

    Cordier, J.-J.; Hemsworth, R.; Bayetti, P.

    2006-01-01

    Remote handling maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the nuclear phase of exploitation of ITER, and be considered at a very early stage since it significantly impacts on the components design, interfaces management and integration business. A large part of the R/H equipment will be procured by the EU partner, in particular the whole Neutral Beam Remote Handling (RH) equipment package. A great deal of work has already been done in this field during the EDA phase of ITER project, but improvements and alternative option that are now proposed by ITER lead to added RH and maintenance engineering studies. The Neutral Beam Heating -and- Current Drive system 1 is being revisited by the ITER project. The vertical maintenance scheme that is presently considered by ITER, may significantly impact on the reference design of the Neutral Beam (NB) system and associated components and lead to new design of the NB box itself. In addition, revision of both NB cell radiation level zoning and remote handling classification of the beam line injector will also significantly impact on components design and maintenance. Based on the experience gained on the vertical maintenance scheme, developed in detail for the ITER Neutral Beam Test Facility 2 to be built in Europe in a near future, guidelines for the revision of the design and preliminary feasibility study of the remote handling vertical maintenance scheme of beam line components are described in the paper. A maintenance option for the SINGAP3 accelerator is also presented. (author)

  11. Health and Maintenance Status Determination and Predictive Fault Diagnosis System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this project is to demonstrate intelligent health and maintenance status determination and predictive fault diagnosis techniques for NASA rocket...

  12. Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish-Engine Solar Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Qui, Songgang [Temple University; Galbraith, Ross [Infinia

    2013-01-23

    This final report summarizes the final results of the Phase II Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish-Engine Solar Power Generation project being performed by Infinia Corporation for the U.S. Department of Energy under contract DE-FC36-08GO18157 during the project period of September 1, 2009 - August 30, 2012. The primary objective of this project is to demonstrate the practicality of integrating thermal energy storage (TES) modules, using a suitable thermal salt phase-change material (PCM) as its medium, with a dish/Stirling engine; enabling the system to operate during cloud transients and to provide dispatchable power for 4 to 6 hours after sunset. A laboratory prototype designed to provide 3 kW-h of net electrical output was constructed and tested at Infinia's Ogden Headquarters. In the course of the testing, it was determined that the system's heat pipe network - used to transfer incoming heat from the solar receiver to both the Stirling generator heater head and to the phase change salt - did not perform to expectations. The heat pipes had limited capacity to deliver sufficient heat energy to the generator and salt mass while in a charging mode, which was highly dependent on the orientation of the device (vertical versus horizontal). In addition, the TES system was only able to extract about 30 to 40% of the expected amount of energy from the phase change salt once it was fully molten. However, the use of heat pipes to transfer heat energy to and from a thermal energy storage medium is a key technical innovation, and the project team feels that the limitations of the current device could be greatly improved with further development. A detailed study of manufacturing costs using the prototype TES module as a basis indicates that meeting DOE LCOE goals with this hardware requires significant efforts. Improvement can be made by implementing aggressive cost-down initiatives in design and materials

  13. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  14. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  15. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  16. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  17. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  18. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  19. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  20. The Isan Culture Maintenance and Revitalisation Programme's Multilingual Signage Attitude Survey: Phase II

    Science.gov (United States)

    Draper, John

    2016-01-01

    This article contextualises and presents to the academic community the full dataset of the Isan Culture Maintenance and Revitalisation Programme's (ICMRP) multilingual signage survey. The ICMRP is a four-year European Union co-sponsored project in Northeast Thailand. This article focuses on one aspect of the project, four surveys each of 1,500…

  1. A report upon the Grand Coulee Fish Maintenance Project 1939-1947

    Science.gov (United States)

    Fish, F.F.; Hanavan, Mitchell G.

    1948-01-01

    The construction or Grand Coulee Dam, on the upper Columbia River, involved the loss of 1,140 lineal miles of spawning and rearing stream to the production of anadromous fishes. The fact that the annual value of these fish runs to the nation was estimated at $250,000 justified reasonable expenditures to assure their perpetuation. It was found economically infeasible to safely collect and pass adult fish upstream and fingerling fish downstream at the dam because of the tremendous flow of the river and the 320 foot vertical difference in elevation between forebay and tailrace.The Grand Coulee Fish-Maintenance Project, undertaken by the United States Fish and Wildlife Service in 1939, consisted in relocating the anadroumous runs of the upper Columbia River to four major tributaries entering below the Grand Coulee damsite. These streams were believed capable of supporting several times their existing, badly depleted, run. The plan was predicated upon the assumption that the relocated runs, in conformity with their "homing tendency", would return to the lower tributaries rather than attempt to reach their ancestral spawning grounds above Grand Coulee Dam. This interim report covers the history and accomplishments of the Grand Coulee Fish-Maintenance Project through the initial period of relocating the rune as well as the first four years of the permanent program. Results obtained to date indicate conclusive success in diverting the upper Columbia fish runs into the accessible lower tributaries. The results also indicate, less conclusively, that - in spite of many existing handicaps - the upper Columbia salmon and steelhead runs may be rehabilitated through the integrated program of natural and artificial propagation incorporated in the Grand Coulee Fish-Maintenance Project.

  2. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  3. Maintenance phase in psoralen-ultraviolet A phototherapy of early-stage mycosis fungoides. A critically appraised topic.

    Science.gov (United States)

    Grandi, V; Delfino, C; Pileri, A; Pimpinelli, N

    2017-08-01

    A 65-year-old patient affected by mycosis fungoides (MF) stage IB achieved complete remission (CR) after a cycle of PUVA phototherapy. The U.S. Cutaneous Lymphoma Consortium (USCLC) guidelines suggest that the patient should be kept in the maintenance phase, defined as a 'period of gradual decrease of frequency of UVL [ultraviolet light] while in clinical remission before discontinuation of phototherapy' by slowly tapering the number of psoralen-ultraviolet A (PUVA) applications over time up to clinical relapse. The USCLC guidelines also suggest a standardized schedule for the maintenance phase. Alternatively, the patient could end PUVA therapy and go straight to follow-up. The aim of this critically appraised topic (CAT) was to determine if a maintenance phase gives a significant benefit in terms of relapse rate (RR) and RFI in patients affected by early-stage MF who had achieved CR under PUVA phototherapy. Embase, PubMed and TRIP databases were searched for 'mycosis fungoides' AND [('photochemotherapy' OR 'puva') OR 'psoralen'] in June 2016. Three articles matched our inclusion criteria and are discussed in this CAT. In this field of research the literature is poor and the reported level of evidence is low. Only one of the studies was conducted prospectively, and none were randomized. No significant difference in terms of reduction in relapse rate or increase in RFI in patients who underwent a PUVA maintenance phase emerged when compared with those who went for simple follow-up. Further randomized clinical trials (RCTs) are required in order to evaluate maintenance phase vs. no treatment before it can be favoured as the standard protocol of treatment in early-stage MF. At the time of writing this paper, we report an ongoing Austrian multicentre RCT (Clinical Trial.gov identifier: NCT01686594) that will hopefully give useful results in this topic. © 2017 British Association of Dermatologists.

  4. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  5. Streamline Your Project: A Lifecycle Model.

    Science.gov (United States)

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  6. Accounting for maintenance in the design of nuclear power plants

    International Nuclear Information System (INIS)

    Meuwisse, C.; Martin-Mattei, C.; Hamon, L.

    1997-01-01

    The objective of the CIDEM project (French acronym for Design Integrating Availability, Operating Experience and Maintenance) is to control the per-kW production cost of future Electricite de France REP 2000 nuclear plants. In particular, such cost control requires accounting for maintenance and logistic support from the time of design of the future installations. This technical and economic optimization is based on assessment and comparison of possible choices in terms of materials and maintenance, and on the search for potential improvements. In the Basic Design phase, the method involves identifying reference components which are supposed highly similar to the components to be designed. In the Construction phase, it culminates in the early definition of a detailed maintenance and support plant. To be effective, the approach requires realistic tailoring of the studies to be undertaken, and the participation of multidisciplinary teams working in the framework of concurrent engineering. (author)

  7. Effect of Different Training Methods on Stride Parameters in Speed Maintenance Phase of 100-m Sprint Running.

    Science.gov (United States)

    Cetin, Emel; Hindistan, I Ethem; Ozkaya, Y Gul

    2018-05-01

    Cetin, E, Hindistan, IE, Ozkaya, YG. Effect of different training methods on stride parameters in speed maintenance phase of 100-m sprint running. J Strength Cond Res 32(5): 1263-1272, 2018-This study examined the effects of 2 different training methods relevant to sloping surface on stride parameters in speed maintenance phase of 100-m sprint running. Twenty recreationally active students were assigned into one of 3 groups: combined training (Com), horizontal training (H), and control (C) group. Com group performed uphill and downhill training on a sloping surface with an angle of 4°, whereas H group trained on a horizontal surface, 3 days a week for 8 weeks. Speed maintenance and deceleration phases were divided into distances with 10-m intervals, and running time (t), running velocity (RV), step frequency (SF), and step length (SL) were measured at preexercise, and postexercise period. After 8 weeks of training program, t was shortened by 3.97% in Com group, and 2.37% in H group. Running velocity also increased for totally 100 m of running distance by 4.13 and 2.35% in Com, and H groups, respectively. At the speed maintenance phase, although t and maximal RV (RVmax) found to be statistically unaltered during overall phase, t was found to be decreased, and RVmax was preceded by 10 m in distance in both training groups. Step length was increased at 60-70 m, and SF was decreased at 70-80 m in H group. Step length was increased with concomitant decrease in SF at 80-90 m in Com group. Both training groups maintained the RVmax with a great percentage at the speed maintenance phase. In conclusion, although both training methods resulted in an increase in running time and RV, Com training method was more prominently effective method in improving RV, and this improvement was originated from the positive changes in SL during the speed maintaining phase.

  8. Analysis Of Factors Causing Delays On Harun Nafsi - Hm Rifadin Street In Samarinda East Kalimantan Maintenance Project

    Directory of Open Access Journals (Sweden)

    Fadli

    2017-12-01

    Full Text Available This study aims to identify analyze and describe the factors that affect the project maintenance delay on Harun Nafsi - HM. Rifadin Street in Samarinda East Kalimantan. This research uses qualitative research method by utilizing questionnaires. The 30 participating respondents consist of 14 project implementers and 16 field implementers. The data are analyzed by descriptive statistical technique factor analysis and linear regression analysis. The results show that the factors influencing the delay of maintenance project of Harun Nafis - HM Rifadin Street include 1 time factor and workmanship factor 2 human resources and natural factors 3 geographical conditions late approval plans change and labor strikes and 4 non-optimal working levels and changes in the scope of the project during the work are still ongoing. Based on multiple linear regression analysis coefficient of determination value of 0.824 is obtained. It means that the four factors studied affect 82.4 of project delays and the rest of 27.6 is influenced by other variables out of this study. The results of this study also indicate that the dominant factor for road maintenance project delays is the fourth factor of the factors mentioned. The effort that the contractor needs to undertake is not to expand the employment contract if the project is underway or the contractor does not have the capability to complete another project.

  9. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  10. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  11. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  12. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  13. Dynamic modulation of corticospinal excitability and short-latency afferent inhibition during onset and maintenance phase of selective finger movement.

    Science.gov (United States)

    Cho, Hyun Joo; Panyakaew, Pattamon; Thirugnanasambandam, Nivethida; Wu, Tianxia; Hallett, Mark

    2016-06-01

    During highly selective finger movement, corticospinal excitability is reduced in surrounding muscles at the onset of movement but this phenomenon has not been demonstrated during maintenance of movement. Sensorimotor integration may play an important role in selective movement. We sought to investigate how corticospinal excitability and short-latency afferent inhibition changes in active and surrounding muscles during onset and maintenance of selective finger movement. Using transcranial magnetic stimulation (TMS) and paired peripheral stimulation, input-output recruitment curve and short-latency afferent inhibition (SAI) were measured in the first dorsal interosseus and abductor digiti minimi muscles during selective index finger flexion. Motor surround inhibition was present only at the onset phase, but not at the maintenance phase of movement. SAI was reduced at onset but not at the maintenance phase of movement in both active and surrounding muscles. Our study showed dynamic changes in corticospinal excitability and sensorimotor modulation for active and surrounding muscles in different movement states. SAI does not appear to contribute to motor surround inhibition at the movement onset phase. Also, there seems to be different inhibitory circuit(s) other than SAI for the movement maintenance phase in order to delineate the motor output selectively when corticospinal excitability is increased in both active and surrounding muscles. This study enhances our knowledge of dynamic changes in corticospinal excitability and sensorimotor interaction in different movement states to understand normal and disordered movements. Published by Elsevier Ireland Ltd.

  14. A survey of research projects in maintenance optimization for Electricite de France power plants

    International Nuclear Information System (INIS)

    Jacquot, J.P.

    1996-01-01

    Six years ago, Electricite de France launched a Reliability Centered Maintenance (RCM) pilot project to optimize preventive maintenance for its nuclear power plants. After a feasibility study, a Reliability Centered Maintenance (RCM) method was standardized. It is now applied on a large scale to the 50 EDF nuclear units. A RCM workstation based on this standardized method has been developed and is now used in each plant. In the next step, the author will consider whether a risk based approach can be included in this RCM process in order to analyze critical passive components such as pipes and supports. Considering the potential advantages of these optimization techniques, a dedicated process has been also developed for maintenance of future plants, gas turbines, or nuclear units. For these future plants, a Logistic Support Analysis (LSA) will be added to the RCM process to globally evaluate availability, safety and maintenance costs. This paper will present a survey of these different developments of methods and tools

  15. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    Science.gov (United States)

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  16. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    Directory of Open Access Journals (Sweden)

    Christos Antonopoulos

    2016-06-01

    Full Text Available In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes, and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  17. Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets

    Energy Technology Data Exchange (ETDEWEB)

    Chew, S.P.; Dunnett, S.J. [Department of Aeronautical and Automotive Engineering, Loughborough University, Loughborough, Leics (United Kingdom); Andrews, J.D. [Department of Aeronautical and Automotive Engineering, Loughborough University, Loughborough, Leics (United Kingdom)], E-mail: j.d.andrews@lboro.ac.uk

    2008-07-15

    A common scenario in engineering is that of a system which operates throughout several sequential and distinct periods of time, during which the modes and consequences of failure differ from one another. This type of operation is known as a phased mission, and for the mission to be a success the system must successfully operate throughout all of the phases. Examples include a rocket launch and an aeroplane flight. Component or sub-system failures may occur at any time during the mission, yet not affect the system performance until the phase in which their condition is critical. This may mean that the transition from one phase to the next is a critical event that leads to phase and mission failure, with the root cause being a component failure in a previous phase. A series of phased missions with no maintenance may be considered as a maintenance-free operating period (MFOP). This paper describes the use of a Petri net (PN) to model the reliability of the MFOP and phased missions scenario. The model uses Monte-Carlo simulation to obtain its results, and due to the modelling power of PNs, can consider complexities such as component failure rate interdependencies and mission abandonment. The model operates three different types of PN which interact to provide the overall system reliability modelling. The model is demonstrated and validated by considering two simple examples that can be solved analytically.

  18. Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets

    International Nuclear Information System (INIS)

    Chew, S.P.; Dunnett, S.J.; Andrews, J.D.

    2008-01-01

    A common scenario in engineering is that of a system which operates throughout several sequential and distinct periods of time, during which the modes and consequences of failure differ from one another. This type of operation is known as a phased mission, and for the mission to be a success the system must successfully operate throughout all of the phases. Examples include a rocket launch and an aeroplane flight. Component or sub-system failures may occur at any time during the mission, yet not affect the system performance until the phase in which their condition is critical. This may mean that the transition from one phase to the next is a critical event that leads to phase and mission failure, with the root cause being a component failure in a previous phase. A series of phased missions with no maintenance may be considered as a maintenance-free operating period (MFOP). This paper describes the use of a Petri net (PN) to model the reliability of the MFOP and phased missions scenario. The model uses Monte-Carlo simulation to obtain its results, and due to the modelling power of PNs, can consider complexities such as component failure rate interdependencies and mission abandonment. The model operates three different types of PN which interact to provide the overall system reliability modelling. The model is demonstrated and validated by considering two simple examples that can be solved analytically

  19. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  20. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  1. Final report on the maintenance asset management project : phase I.

    Science.gov (United States)

    2012-07-01

    This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT res...

  2. Project Half Double: Current Results of Phase 1 and Phase 2, December 2017

    DEFF Research Database (Denmark)

    Svejvig, Per; Thorp Adland, Karoline; Zippora Klein, Judith Birte

    ’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved) and not as half the time...... of Project Half Double was initiated in June 2015. It is a two-phase project: phase 1 took place from June 2015 to June 2016 with seven pilot projects, and phase 2 is in progress from July 2016 to July 2018 with 10 pilot projects. The Half Double consortium: Implement Consulting Group is the project leader....... 2016, Svejvig et al. 2017). This report’s target group inludes practitioners in Danish industry and society in general. The editorial team from Aarhus University prepared the report from October 2017 to December 2017, which means that data about pilot projects from December 2017 is not included....

  3. The CIDEM project for integrating availability, operating experience and maintenance in the design of future nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1998-01-01

    To minimize the kWh cost of future nuclear plants EDF has decided to implement the CIDEM project (French acronym for Design Integrating Availability, Operating Experience and Maintenance), an analytic and systematic process for studying new projects. The first CIDEM application is centered on the future French nuclear unit construction program, known as the REP 2000 Program but the approach could be applied to other Reactor type. The CIDEM studies at the beginning, were oriented to the issues strongly impacting the availability. They have concerned: planned outages, forced outages and preventive maintenance. The studies were carried out by a team grouping engineers from the 3 EDF's Divisions (Engineering-Generation-Research), and working together in a Concurrent Engineering-Mode. This team works in close collaboration with the vendors and the German Utilities involved in the REP 2000 EPR program. The implementation of the CIDEM process constitutes for EDF a new approach to the study of the new Nuclear Power Plant projects. The studies conducted in the availability field have already highlighted a number of critical points and have made it possible to establish a series of specifications for the REP 2000/EPR project. The integration in the design process of Preventive Maintenance and Logistic Support studies will allow a better control of the maintenance cost. The competitiveness of nuclear energy greatly depends on the success of such an approach. (author)

  4. Yakima Basin Fish Passage Project, Phase 2

    International Nuclear Information System (INIS)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs

  5. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  6. How Project Management Tools Aid in Association to Advance Collegiate Schools of Business (AACSB) International Maintenance of Accreditation

    Science.gov (United States)

    Cann, Cynthia W.; Brumagim, Alan L.

    2008-01-01

    The authors present the case of one business college's use of project management techniques as tools for accomplishing Association to Advance Collegiate Schools of Business (AACSB) International maintenance of accreditation. Using these techniques provides an efficient and effective method of organizing maintenance efforts. In addition, using…

  7. Savanna ecosystem project: phase I summary and phase II progress

    CSIR Research Space (South Africa)

    Huntely, BJ

    1978-07-01

    Full Text Available A summary of the results of the first phase (mid 1974 to mid 1976) of the South African Savanna Ecosystem Project being undertaken at Nylsvley in the northern Transvaal is presented. Phase I of this ten year study of the structure and functioning...

  8. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  9. THE SYSTEM OF PROCESSES AND PROJECTS OF THE AIRCRAFT AIRWORTHINESS MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Alexander A. Itskovich

    2018-01-01

    Full Text Available The concept of the aviation enterprise as a unified system of processes and projects of the aircraft airworthiness maintenance (AAM is presented. The relevance of project management tools usage, including the transport branch, is noted; the examples of successful implementation of the development projects at domestic enterprises manufacturing aircraft engines are given. A scheme for the classification of the AAM projects and processes, reflecting their interrelationship, is proposed. The operational activity of the enterprise is a combination of its business processes. The company selects plans and implements the relevant projects for the business processes optimization. At the same time, the projects themselves are the objects of management based on standardized processes. The processes of project management and the main processes of the enterprise are also interrelated and can be objects included in the unified regulations of its units. Increasing the efficiency of operational processes and processes of the aviation enterprise management is the goal of development projects, which are divided into investment projects and organizational changes projects.Limitation of organizational and financial resources of the company requires the identification and systematization of all projects and processes, while the application of project management standards allows to analyze the opportunities and to determine the sequence of their implementation. The importance of accumulating experience of completed projects is shown; the results can become typical methods for planning, organizing the implementation and monitoring of AAM projects. Specific forms of the project management standards implementation for AN-124-100 constructive modification project in LLC Volga-Dnepr Airlines are demonstrated: the control events plan and the project team formation.

  10. Expert system for compressor maintenance support; Sistema especialista para apoio a manutencao de compressores

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Jonny Carlos da [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica; Caletti, Luciano [KEOHPS - Knowledge Engineering on Hydraulic and Pneumatic System, SC (Brazil); Luna, Paulo de T.M. [Universidade Regional de Blumenau - FURB, SC (Brazil)

    2004-07-01

    The performance of critical machines in industrial processes, such as compressors used in industrial plants, is fundamental for overall company operation. In this context, it becomes strategic the application of methods and tools to support the operation and maintenance of the most relevant process equipment. Among these computational tools are the Expert Systems, which aim to emulate the decision making process of human experts in a specific knowledge domain. In Oil and Gas domain, an example of such tools is the SEGRED project, which combines expert system techniques with dynamic simulation of transport and distribution natural gas networks. The SECOMP project, Expert System for Compressor Maintenance, is considered a spin-off of the SEGRED. Its objective is to develop an expert system to support maintenance activities, aiming to increase reliability, improve performance and reduce maintenance and operational costs. This article presents the first phase of the SECOMP project, which is related to the development of an expert system prototype for corrective maintenance of natural gas reciprocating compressors. The paper discusses the context of this knowledge domain, the prototype development and its potential contribution in an industrial environment. (author)

  11. Adherence to Dietary Recommendations in Maintenance Phase Kidney Transplant Patients.

    Science.gov (United States)

    Ichimaru, N; Nakazawa, S; Yamanaka, K; Kakuta, Y; Abe, T; Kaimori, J-Y; Imamura, R; Nonomura, N; Takahara, S

    2016-04-01

    Current adherence to dietary recommendations for chronic kidney disease was evaluated in kidney transplant patients in the maintenance phase. A total of 268 maintenance phase kidney transplant patients were included in the study. Estimated daily intakes of oral protein and salt were calculated from 24-h urinary excretion of nitrogen and sodium, respectively. Dietary recommendations for chronic kidney disease, as issued in 2014 by the Japanese Society of Nephrology, were used as the basis for assessing diet. The study included 114 female patients and 154 male patients. The mean age, posttransplantation years, body mass index, estimated glomerular filtration rate, and 24-h urinary excretion of protein were 56.3 years, 11.2 years, 22.0 kg/m(2), 42.6 mL/min/1.73 m(2), and 321 mg/d, respectively. Estimated daily protein and salt intakes were 0.98 ± 0.26 g/kg/d and 9.3 ± 3.9 g/d. Only 47 patients (17.5%) in the case of salt intake and 105 patients (39.2%) in the case of protein intake were within reference values. The 24-h urinary protein excretion of the daily salt intake-adherent group (adherence rate to dietary recommendations for chronic kidney disease in kidney transplant patients was low. The 24-h urinary protein excretion of the daily salt intake-adherent group was significantly less than that of the nonadherent group. Dietary therapy for these patients may have the potential to improve kidney graft function and survival. Copyright © 2016 Elsevier Inc. All rights reserved.

  12. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  13. TP Atlas: integration and dissemination of advances in Targeted Proteins Research Program (TPRP)-structural biology project phase II in Japan.

    Science.gov (United States)

    Iwayanagi, Takao; Miyamoto, Sei; Konno, Takeshi; Mizutani, Hisashi; Hirai, Tomohiro; Shigemoto, Yasumasa; Gojobori, Takashi; Sugawara, Hideaki

    2012-09-01

    The Targeted Proteins Research Program (TPRP) promoted by the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan is the phase II of structural biology project (2007-2011) following the Protein 3000 Project (2002-2006) in Japan. While the phase I Protein 3000 Project put partial emphasis on the construction and maintenance of pipelines for structural analyses, the TPRP is dedicated to revealing the structures and functions of the targeted proteins that have great importance in both basic research and industrial applications. To pursue this objective, 35 Targeted Proteins (TP) Projects selected in the three areas of fundamental biology, medicine and pharmacology, and food and environment are tightly collaborated with 10 Advanced Technology (AT) Projects in the four fields of protein production, structural analyses, chemical library and screening, and information platform. Here, the outlines and achievements of the 35 TP Projects are summarized in the system named TP Atlas. Progress in the diversified areas is described in the modules of Graphical Summary, General Summary, Tabular Summary, and Structure Gallery of the TP Atlas in the standard and unified format. Advances in TP Projects owing to novel technologies stemmed from AT Projects and collaborative research among TP Projects are illustrated as a hallmark of the Program. The TP Atlas can be accessed at http://net.genes.nig.ac.jp/tpatlas/index_e.html .

  14. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  15. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  16. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  17. [Pulmonary function of children with acute leukemia in maintenance phase of chemotherapy].

    Science.gov (United States)

    de Macêdo, Thalita Medeiros Fernandes; Campos, Tania Fernandes; Mendes, Raquel Emanuele de França; França, Danielle Corrêa; Chaves, Gabriela Suéllen da Silva; de Mendonça, Karla Morganna Pereira Pinto

    2014-12-01

    The aim of this study was to assess the pulmonary function of children with acute leukemia. Cross-sectional observational analytical study that enrolled 34 children divided into groups A (17 with acute leukemia in the maintenance phase of chemotherapy) and B (17 healthy children). The groups were matched for sex, age and height. Spirometry was measured using a spirometer Microloop Viasys(®) in accordance with American Thoracic Society and European Respiratory Society guidelines. Maximal respiratory pressures were measured with an MVD300 digital manometer (Globalmed(®)). Maximal inspiratory pressures and maximal expiratory pressures were measured from residual volume and total lung capacity, respectively. Group A showed a significant decrease in maximal inspiratory pressures when compared to group B. No significant difference was found between the spirometric values of the two groups, nor was there any difference between maximal inspiratory pressure and maximal expiratory pressure values in group A compared to the lower limit values proposed as reference. Children with acute leukemia, myeloid or lymphoid, during the maintenance phase of chemotherapy exhibited unchanged spirometric variables and maximal expiratory pressure; However, there was a decrease in inspiratory muscle strength. Copyright © 2014 Associação de Pediatria de São Paulo. Publicado por Elsevier Editora Ltda. All rights reserved.

  18. A Portable Cell Maintenance System for Rapid Toxicity Monitoring Final Report CRADA No. TC-02081-04

    Energy Technology Data Exchange (ETDEWEB)

    Kane, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zhou, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-27

    The Phase I STTR research project was targeted at meeting the objectives and requirements stated in STTR solicitation A04-T028 for a Portable Cell Maintenance System for Rapid Toxicity Monitoring. In accordance with the requirements for STTR programs, collaboration was formed between a small business, Kionix, Inc., and The Regents of the University of California, Lawrence Livermore National Laboratory (LLNL). The collaboration included CytoDiscovery, Inc. (CDI) which, in collaboration with Kionix, provided access to membrane chip technology and provided program support and coordination. The objective of the overall program (excerpted from the original solicitation) was: “To develop a small, portable cell maintenance system for the transport, storage, and monitoring of viable vertebrate cells and tissues.” The goal of the Phase I project was to demonstrate the feasibility of achieving the program objectives utilizing a system comprised of a small-size, microfluidic chip-based cell maintenance cartridge (CMC) and a portable cell maintenance system (CMS) capable of housing a minimum of four CMCs. The system was designed to be capable of optimally maintaining multiple vertebrate cell types while supporting a wide variety of cellular assays.

  19. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  20. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  1. Final report on the surface-based investigation phase (phase 1) at the Mizunami Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Matsuoka, Toshiyuki

    2011-03-01

    The Mizunami Underground Research Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal

  2. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  3. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  4. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  5. “Rejecting the inevitability of poverty”: Empower women for sustainable rural livelihoods through community-based employment intensive rural infrastructure maintenance projects

    CSIR Research Space (South Africa)

    Mashiri, M

    2008-11-01

    Full Text Available This paper discuses the extent to which employment-intensive rural infrastructure maintenance projects can be used as a tool to empower women to achieve sustainable rural livelihoods using Siyatentela rural road maintenance program in Mpumalanga...

  6. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  7. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  8. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures

  9. Laser projection using generalized phase contrast

    DEFF Research Database (Denmark)

    Glückstad, Jesper; Palima, Darwin; Rodrigo, Peter John

    2007-01-01

    is introduced. An arbitrary phase shift filter eliminates the need for high-frequency modulation and conjugate phase encoding. This lowers device performance requirements and allows practical implementation with currently available dynamic spatial light modulators. (c) 2007 Optical Society of America.......We demonstrate experimental laser projection of a gray-level photographic image with 74% light efficiency using the generalized phase contrast (GPC) method. In contrast with a previously proposed technique [Alonzo et al., New J. Phys. 9, 132 (2007)], a new approach to image construction via GPC...

  10. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages, Phase 1. Final report

    International Nuclear Information System (INIS)

    Thompson, C.A.

    1978-08-01

    The objective of this project is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements toward reducing its overall duration. Thus, the plant's availability for power production would be increased. Revisions in procedures and some equipment modifications were implemented and evaluated during the Zion Unit 2 refueling/maintenance outage beginning in January 1977. Analysis of the observed data has identified benefits available through improved refueling equipment and also areas where additional new, innovative refueling, or refueling-related equipment should be beneficial. A number of specific design concepts are recommended as a result of Phase 1. In addition, a new master planning mechanism is described for implementation during subsequent planned outages at Zion Station. This final report describes the recommended conceptual designs and planning mechanism and assesses their impact upon future outages. Their effect on savings in refueling time, labor, and radiation exposure is discussed. The estimated economic payoff for these concepts was found to be of such significance that an additional phase of the program is warranted. During this extended phase, a more detailed engineering study should be undertaken to determine the cost of implementation along with more specific estimates of the benefits for PWR plants already in operation or under construction

  11. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    OpenAIRE

    Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...

  12. INCREASING THE AIRCRAFT AIRWORTHINESS MAINTENANCE EFICIENCY BASED ON THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Alexander Abramovich Itskovich

    2017-01-01

    Full Text Available The interrelation between aircraft airworthiness maintenance process (AAMP and the process of project man- agement methodology application is demonstrated.A project portfolio can be formed based on the strategic objectives. The projects with the highest priority are car- ried out, including those which strive to improve the efficiency of AAMP. The proposed approach allows to find the priori- ties of specific projects realization, which are included in the airline project portfolio.The project aimed to improve the efficiency of the AAMP of AN-124-100 of "Volga-Dnepr Airlines" is presented as an example. The statistical data analysis of failures of AN-124-100 fleet has demonstrated that wing components most frequently fail, especially spoiler sections, which are subjected to honeycomb skin mass exfoliation and need to be modi- fied. One of the expected project results should be the К1000 reduction of the wing spoilers not less than for 40 % and, respectively, the plane in total - not less than for 4 %.The work is executed in full compliance with the standards of project management. The passport of the project is given, which contains all the necessary information about the project: its goals, outcomes, results, timelines, action plan, budget and participants. A special attention is paid to the risks of the project, their probability assessment and the actions for overcoming possible consequences. It is shown that the implementation of the project "Introduction of aircraft AN-124-100 spoilers technology modi- fication" allows to improve a number of production and technical efficiency indicators, with material, financial and organi- zational resources optimization.

  13. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  14. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  15. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  16. Natural gas distribution operation and maintenance dissemination project Kaunas City, Lithuania. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The main objective of this project has been to disseminate the results and experiences achieved during the former projects in Kaunas to other Lithuanian gas companies and the gas sector in general. Also new subjects selected in co-operation with Kaunas Gas Company, the Lithuanian Energy Institute and the Lithuanian Gas Training Centre, where improvements were required, have been implemented. The components of the project were the following: (1) A training course in cathodic protection. One course concerning measuring and registration and one course concerning design and implementation. (2) A pilot project to develop methods for measuring cathodic protection on coherent steel pipe network. (3) Analysis of gas losses related to types of gas meters and calibration of meters. (4) A training course and technology transfer concerning relations between gas companies and consumers. (5) Dissemination of the experience of 1998 from the preparation of an operation and maintenance manual for Kaunas Gas Company. Dissemination of the ideas to other Lithuanian gas companies. (EHS)

  17. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  18. The Effect of a Multiple Treatment Program and Maintenance Procedures on Smoking Cessation.

    Science.gov (United States)

    Powell, Don R.

    The efficacy of a multiple treatment smoking cessation program and three maintenance strategies was evaluated. Phases I and II of the study involved 51 subjects who participated in a five-day smoking cessation project consisting of lectures, demonstrations, practice exercises, negative smoking, and the teaching of self-control procedures. At the…

  19. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    Science.gov (United States)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  20. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  3. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  4. Uncertainty in project phases: A framework for organisational change management

    DEFF Research Database (Denmark)

    Kreye, Melanie; Balangalibun, Sarah

    2015-01-01

    in the early stage of the change project but was delayed until later phases. Furthermore, the sources of uncertainty were found to be predominantly within the organisation that initiated the change project and connected to the project scope. Based on these findings, propositions for future research are defined......Uncertainty is an integral challenge when managing organisational change projects (OCPs). Current literature highlights the importance of uncertainty; however, falls short of giving insights into the nature of uncertainty and suggestions for managing it. Specifically, no insights exist on how...... uncertainty develops over the different phases of OCPs. This paper presents case-based evidence on different sources of uncertainty in OCPs and how these develop over the different project phases. The results showed some surprising findings as the majority of the uncertainty did not manifest itself...

  5. Sears Point Tidal Marsh Restoration Project: Phase I

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  6. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  7. Neutron induced activation in the EVEDA accelerator materials: Implications for the accelerator maintenance

    International Nuclear Information System (INIS)

    Sanz, J.; Garcia, M.; Sauvan, P.; Lopez, D.; Moreno, C.; Ibarra, A.; Sedano, L.

    2009-01-01

    The Engineering Validation and Engineering Design Activities (EVEDA) phase of the International Fusion Materials Irradiation Facility project should result in an accelerator prototype for which the analysis of the dose rates evolution during the beam-off phase is a necessary task for radioprotection and maintenance feasibility purposes. Important aspects of the computational methodology to address this problem are discussed, and dose rates for workers inside the accelerator vault are assessed and found to be not negligible.

  8. Neutron induced activation in the EVEDA accelerator materials: Implications for the accelerator maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sanz, J. [Department of Power Engineering, Universidad Nacional de Educacion a Distancia (UNED), C/Juan del Rosal 12, 28040 Madrid (Spain); Institute of Nuclear Fusion, UPM, 28006 Madrid (Spain)], E-mail: jsanz@ind.uned.es; Garcia, M.; Sauvan, P.; Lopez, D. [Department of Power Engineering, Universidad Nacional de Educacion a Distancia (UNED), C/Juan del Rosal 12, 28040 Madrid (Spain); Institute of Nuclear Fusion, UPM, 28006 Madrid (Spain); Moreno, C.; Ibarra, A.; Sedano, L. [CIEMAT, 28040 Madrid (Spain)

    2009-04-30

    The Engineering Validation and Engineering Design Activities (EVEDA) phase of the International Fusion Materials Irradiation Facility project should result in an accelerator prototype for which the analysis of the dose rates evolution during the beam-off phase is a necessary task for radioprotection and maintenance feasibility purposes. Important aspects of the computational methodology to address this problem are discussed, and dose rates for workers inside the accelerator vault are assessed and found to be not negligible.

  9. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Science.gov (United States)

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  10. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Directory of Open Access Journals (Sweden)

    Tiong Kung Leong

    2014-01-01

    Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  11. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    Science.gov (United States)

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  12. An Introduction to Quantitative Measures for Software Maintenance of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jo, Hyun Jun; Seong, Poong Hyun

    2007-01-01

    The I and C system of NPP has changed from the analog system to the digital-based system using microcontrollers and software. Thus, software has become very important for NPP control system. The software life cycle is divided into the development and maintenance phase largely. Because poor software maintenance work introduces new errors and makes software much complex, we have to consider the effective maintenance methods for the reliability and maintainability of NPP software. Function Block Diagram (FBD) is a standard application programming language for the Programmable Logic Controller (PLC) and currently being used in the development of a fully-digitalized reactor protection system (RPS) under the KNICS project. Therefore, the maintenance work will be of great importance in a few years. This paper studies on the measures which give quantitative information to software maintainer and manager before and after modification. The remainder of this paper is organized as follows. Section 2 briefly describes software maintenance types and model. In Section 3-5, we introduce the quantitative measures for software maintenance and characteristics of FBD program. A conclusion is provided in Section 6

  13. A Field Study of Scale Economies in Software Maintenance

    OpenAIRE

    Rajiv D. Banker; Sandra A. Slaughter

    1997-01-01

    Software maintenance is a major concern for organizations. Productivity gains in software maintenance can enable redeployment of Information Systems resources to other activities. Thus, it is important to understand how software maintenance productivity can be improved. In this study, we investigate the relationship between project size and software maintenance productivity. We explore scale economies in software maintenance by examining a number of software enhancement projects at a large fi...

  14. Life cycle - a wide vision of the control valves maintenance; Life cycle - uma visao ampla de manutencao de valvulas de controle

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Jorge Marcos de [Metso Automation do Brasil, ES (Brazil)

    2005-07-01

    Nowadays the industry search more and more contracts which involve the total responsibility by the maintenance of its equipment. What could not be different for the control valves because of its importance and critic to the process. Because of this, the maintenance concept Life Cycle targets to involve all the phases of the life of each control valve, since the project until the day to day maintenance activities, maximizing the performance and generating benefits to the process. (author)

  15. Randomized Phase II trial of paclitaxel and carboplatin followed by gemcitabine switch-maintenance therapy versus gemcitabine and carboplatin followed by gemcitabine continuation-maintenance therapy in previously untreated advanced non-small cell lung cancer

    Directory of Open Access Journals (Sweden)

    Minami Seigo

    2013-01-01

    Full Text Available Abstract Background In recent years, maintenance chemotherapy is increasingly being recognized as a new treatment strategy to improve the outcome of advanced non-small cell lung cancer (NSCLC. However, the optimal maintenance strategy is still controversial. Gemcitabine is a promising candidate for single-agent maintenance therapy because of little toxicity and good tolerability. We have conducted a randomized phase II study to evaluate the validity of single-agent maintenance chemotherapy of gemcitabine and to compare continuation- and switch-maintenance. Methods Chemonaïve patients with stage IIIB/IV NSCLC were randomly assigned 1:1 to either arm A or B. Patients received paclitaxel (200 mg/m2, day 1 plus carboplatin (AUC 6 mg/mL/min, day 1 every 3 weeks in arm A, or gemcitabine (1000 mg/m2, days 1 and 8 plus carboplatin (AUC 5 mg/mL/min, day1 every 3 weeks in arm B. Non-progressive patients following 3 cycles of induction chemotherapy received maintenance gemcitabine (1000 mg/m2, days 1 and 8 every 3 weeks. (Trial registration: UMIN000008252 Results The study was stopped because of delayed accrual at interim analysis. Of the randomly assigned 50 patients, 49 except for one in arm B were evaluable. Median progression-free survival (PFS was 4.6 months for arm A vs. 3.5 months for arm B (HR = 1.03; 95% CI, 0.45–2.27; p = 0.95 and median overall survival (OS was 15.0 months for arm A vs. 14.8 months for arm B (HR = 0.79; 95% CI, 0.40–1.51; p = 0.60, showing no difference between the two arms. The response rate, disease control rate, and the transit rate to maintenance phase were 36.0% (9/25, 64.0% (16/25, and 48% (12/25 for arm A vs. 16.7% (4/24, 50.0% (12/24, and 33% (8/24 for arm B, which were also statistically similar between the two arms (p = 0.13, p = 0.32, and p = 0.30, respectively. Both induction regimens were tolerable, except that more patients experienced peripheral neuropathy in arm A. Toxicities during

  16. PROJECT GOVERNANCE – PHASES AND LIFE CYCLE

    Directory of Open Access Journals (Sweden)

    Robbert Titus DEENEN

    2007-01-01

    Full Text Available When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time.

  17. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  18. Projected phase-change memory devices.

    Science.gov (United States)

    Koelmans, Wabe W; Sebastian, Abu; Jonnalagadda, Vara Prasad; Krebs, Daniel; Dellmann, Laurent; Eleftheriou, Evangelos

    2015-09-03

    Nanoscale memory devices, whose resistance depends on the history of the electric signals applied, could become critical building blocks in new computing paradigms, such as brain-inspired computing and memcomputing. However, there are key challenges to overcome, such as the high programming power required, noise and resistance drift. Here, to address these, we present the concept of a projected memory device, whose distinguishing feature is that the physical mechanism of resistance storage is decoupled from the information-retrieval process. We designed and fabricated projected memory devices based on the phase-change storage mechanism and convincingly demonstrate the concept through detailed experimentation, supported by extensive modelling and finite-element simulations. The projected memory devices exhibit remarkably low drift and excellent noise performance. We also demonstrate active control and customization of the programming characteristics of the device that reliably realize a multitude of resistance states.

  19. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  20. The influence of VKORC1 and CYP2C9 gene sequence variants on the stability of maintenance phase warfarin treatment

    DEFF Research Database (Denmark)

    Skov, Jane; Bladbjerg, Else-Marie; Leppin, Anja

    2013-01-01

    alleles require lower doses and have increased risk of overanticoagulation. METHODS: We investigated the influence of the above sequence variants on stability of maintenance phase warfarin therapy in a prospective study of 300 consecutive patients followed for one year at an anticoagulant clinic. RESULTS...... of common gene sequence variants in CYP2C9 and VKORC1 on stability of maintenance phase warfarin therapy. Patients attending an anticoagulant clinic using computer-assisted dosage were safely monitored regardless of these sequence variants, but for the small subgroup of patients with the CYP2C9 genotype *2...

  1. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  2. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  3. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  4. Framework for Railway Phase-based Planning

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Nielsen, Otto Anker

    spending) to evaluate the project alternatives. The comparison result can identify the most cost-efficient solution in a long run and therefore reduce the overall costs. This article defines a phase-based framework to guide the railway maintenance and renewal project planning at strategic level....... The framework evaluates the project options from a larger LCC scope: The costs from train operation companies and passengers, together with the maintenance and renewal costs from Infrastructure Managers are included in the calculation. The framework simplifies the planning processes and the LCC calculation...... and compared. A case study is introduced in the article to demonstrate how the framework works to compare timber sleepers and concrete sleepers from strategic planning level. Two Life Cycle Cost oriented policies are discussed to illustrate: high quality track is necessity to improve the cost efficiency...

  5. Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

    Science.gov (United States)

    Newman, Walter S.; Fairbridge, Rhodes W.

    This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.

  6. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  7. Qinshan Phase III (CANDU) nuclear power project quality assurance

    International Nuclear Information System (INIS)

    Wang Lingen; Du Jinxiang

    2001-01-01

    The completion and implementation of quality assurance system of Qinshan Phase III (CANDU) nuclear power project are presented. Some comments and understanding with consideration of the project characteristics are put forward

  8. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  9. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  10. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  11. Overcoming challenges: The Koeberg simulator project

    International Nuclear Information System (INIS)

    Marin, J: Bruchental, S.; Lagerwall, J.R.

    2006-01-01

    As the nuclear power simulation training industry matures, the needs of the individual training facilities are becoming increasingly diverse. To respond to this trend, simulation vendors must offer a greater level of customization, and as such, are facing increasingly challenging projects. In 2002, CAE embarked on such a project for South Africas Koeberg nuclear power station. This simulator upgrade project, carried out in two phases, served as a unique exercise in product customization. In the first phase, CAE replaced the simulation servers, the software environment, and re-hosted the existing plant models. In the second phase, CAE replaced several of the existing thermal-hydraulics models to improve simulator fidelity. Throughout this project, CAE overcame a series of challenges stemming from project-specific requirements. In fact, the retention of the legacy software maintenance tools, the preservation of the instructor station package, and the interfacing with the existing hardware panel elements presented a number of opportunities for innovation. In the end, CAE overcame the challenges and acquired invaluable experience in doing so. (author)

  12. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  13. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  14. 24 CFR 266.507 - Maintenance requirements.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.507 Maintenance requirements. The mortgagor must maintain the project in...

  15. Guidelines for remote handling maintenance of ITER neutral beam line components: Proposal of an alternate supporting system

    International Nuclear Information System (INIS)

    Cordier, J.J.; Bayetti, P.; Hemsworth, R.; David, O.; Friconneau, J.P.

    2007-01-01

    Remote handling (R/H) maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the assembly and nuclear phase of exploitation of ITER. It must be considered at a very early stage since it significantly impacts on the components design, interfaces management, assembly, maintenance and integration aspects. A large part of the R/H equipment will be procured by the EU Participating Team, including the whole Neutral Beam R/H Equipment. The Neutral Beam Heating and Current Drive system (NB and CD) design is being revisited by the ITER project. A vertical maintenance scheme is presently considered which may significantly impact on the reference design and associated components and lead to a new design of the NB and CD vacuum tank. In addition, NB line components remote handling solutions are being studied. The neutral beam test facility ITER to be built in Europe in the near future is also based on the vertical NB maintenance scheme of beam line components. New design guidelines compliant for both the ITER NB and CD system and the NB test facility proposed by the CEA association are described in the paper

  16. Multiple Learning Strategies Project. Building Maintenance & Engineering. Visually Impaired.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is designed for visually impaired students in the vocational area of building maintenance and engineering. The twenty-eight learning modules are organized into six units: floor care, general maintenance tasks; restrooms; carpet care; power and hand tools; and cabinet construction. Each module, printed in large block…

  17. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  18. SmartPark Technology Demonstration Project, Phase II: Final Report

    Science.gov (United States)

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  19. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  20. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  1. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  2. Phase accuracy evaluation for phase-shifting fringe projection profilometry based on uniform-phase coded image

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhu, Qian; Zhou, Changquan; Qiao, Jiacheng; Zhang, Lu

    2018-06-01

    Phase-shifting fringe projection profilometry (PSFPP) is a three-dimensional (3D) measurement technique widely adopted in industry measurement. It recovers the 3D profile of measured objects with the aid of the fringe phase. The phase accuracy is among the dominant factors that determine the 3D measurement accuracy. Evaluation of the phase accuracy helps refine adjustable measurement parameters, contributes to evaluating the 3D measurement accuracy, and facilitates improvement of the measurement accuracy. Although PSFPP has been deeply researched, an effective, easy-to-use phase accuracy evaluation method remains to be explored. In this paper, methods based on the uniform-phase coded image (UCI) are presented to accomplish phase accuracy evaluation for PSFPP. These methods work on the principle that the phase value of a UCI can be manually set to be any value, and once the phase value of a UCI pixel is the same as that of a pixel of a corresponding sinusoidal fringe pattern, their phase accuracy values are approximate. The proposed methods provide feasible approaches to evaluating the phase accuracy for PSFPP. Furthermore, they can be used to experimentally research the property of the random and gamma phase errors in PSFPP without the aid of a mathematical model to express random phase error or a large-step phase-shifting algorithm. In this paper, some novel and interesting phenomena are experimentally uncovered with the aid of the proposed methods.

  3. The Unseen Face of E-Business Project Development

    OpenAIRE

    Mesnita, Gabriela; Vasilica, Tiberiu

    2003-01-01

    The purpose of this paper is intent on identify and analyze the unseen factors of successful or failure of e-business project development. The IT managers must take into account both all costs involved in e-business development and all phases (analysis, design, testing, implementation, maintenance and operation) according to principle of project management for software/systems life cycle development. There are many solutions to exceed these factors of failure among could be counted outsourcin...

  4. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  5. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  6. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  7. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  8. Telecentric 3D profilometry based on phase-shifting fringe projection.

    Science.gov (United States)

    Li, Dong; Liu, Chunyang; Tian, Jindong

    2014-12-29

    Three dimensional shape measurement in the microscopic range becomes increasingly important with the development of micro manufacturing technology. Microscopic fringe projection techniques offer a fast, robust, and full-field measurement for field sizes from approximately 1 mm2 to several cm2. However, the depth of field is very small due to the imaging of non-telecentric microscope, which is often not sufficient to measure the complete depth of a 3D-object. And the calibration of phase-to-depth conversion is complicated which need a precision translation stage and a reference plane. In this paper, we propose a novel telecentric phase-shifting projected fringe profilometry for small and thick objects. Telecentric imaging extends the depth of field approximately to millimeter order, which is much larger than that of microscopy. To avoid the complicated phase-to-depth conversion in microscopic fringe projection, we develop a new system calibration method of camera and projector based on telecentric imaging model. Based on these, a 3D reconstruction of telecentric imaging is presented with stereovision aided by fringe phase maps. Experiments demonstrated the feasibility and high measurement accuracy of the proposed system for thick object.

  9. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  10. Sears Point Tidal Marsh Restoration Project: Phase II

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  11. Virtual and augmented reality for training on maintenance

    International Nuclear Information System (INIS)

    Gonzalez, F.

    2001-01-01

    This paper presents two projects focused to support training on maintenance using new technologies. Both projects aims at specifying. designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Virtual Reality (VIRMAN) and Augmented Reality (STARMATE) techniques. VIRMAN project is dedicated to training course development on maintenance using Virtual Reality. It based in the animation of three dimension images for component assembly/de-assembly or equipment movements. STARMATE will rely on Augmented Reality techniques which is a growing area in virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene generated by a computer augmenting the reality with additional information. (Author)

  12. The greenGain project - Biomass from landscape conservation and maintenance work for renewable energy production in the EU

    Science.gov (United States)

    Clalüna, Aline; Baumgarten, Wibke; García Galindo, Daniel; Lenz, Klaus; Doležal, Jan; De Filippi, Federico; Lorenzo, Joaquín; Montagnoli, Louis

    2017-04-01

    The project greenGain is looking for solutions to increase the energy production with regional and local biomass from landscape conservation and maintenance work, which is performed in the public interest. The relevant resources analysed in the greenGain model regions are, among others, biomass residues from clearing invasive vegetation in marginal agricultural lands in Spain, and residues from abandoned vineyards and olive groves in landscape protected areas in Italy. The main target groups are regional and local players who are responsible for maintenance and conservation work and for the biomass residue management in their regions. Moreover, the focus will be on service providers - including farmers and forest owners, their associations, NGOs, energy providers and consumers. Local companies, municipalities and public authorities are collaborating to identify the still underutilised non-food biomass resources and to discuss the way to integrate them into the local and regional biomass markets. Since the start of the three year project in January 2015, the partners from Italy, Spain, Czech Republic and Germany analysed, among other, the biomass feedstock potential coming from landscape maintenance work, and assessed various technological options to utilise this type of biomass. Further, political, legal and environmental aspects as well as awareness raising and public acceptance actions regarding the energetic use of biomass from public areas were assessed. greenGain also facilitates the exchange between model regions and other similar relevant players in the EU and shares examples of good practice. General guidelines will be prepared to guarantee a wide dissemination to other regions in the EU. Thus, the project shows how to build-up reliable knowledge on local availability of this feedstock and provides know-how concerning planning, harvesting, pre-treatment, storage and sustainable conversion pathways to a wide range of stakeholders in the EU.

  13. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  14. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  15. 49 CFR 260.39 - Maintenance standards.

    Science.gov (United States)

    2010-10-01

    ... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Standards for Maintenance of Facilities Involved in the Project... the project. (b) When the proceeds of a direct loan or an obligation guaranteed by the Administrator...

  16. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  17. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  18. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  19. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  20. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  1. Improving Climate Projections by Understanding How Cloud Phase affects Radiation

    Science.gov (United States)

    Cesana, Gregory; Storelvmo, Trude

    2017-01-01

    Whether a cloud is predominantly water or ice strongly influences interactions between clouds and radiation coming down from the Sun or up from the Earth. Being able to simulate cloud phase transitions accurately in climate models based on observational data sets is critical in order to improve confidence in climate projections, because this uncertainty contributes greatly to the overall uncertainty associated with cloud-climate feedbacks. Ultimately, it translates into uncertainties in Earth's sensitivity to higher CO2 levels. While a lot of effort has recently been made toward constraining cloud phase in climate models, more remains to be done to document the radiative properties of clouds according to their phase. Here we discuss the added value of a new satellite data set that advances the field by providing estimates of the cloud radiative effect as a function of cloud phase and the implications for climate projections.

  2. Final report on the surface-based investigation (phase 1) at the Mizunami Underground Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Seno, Yasuhiro; Nakama, Shigeo; Tsuruta, Tadahiko; Amano, Kenji; Takeuchi, Ryuji; Matsuoka, Toshiyuki; Onoe, Hironori; Mizuno, Takashi; Ohyama, Takuya; Hama, Katsuhiro; Sato, Toshinori; Kuji, Masayoshi; Kuroda, Hidetaka; Semba, Takeshi; Uchida, Masahiro; Sugihara, Kozo; Sakamaki, Masanori; Iwatsuki, Teruki

    2007-03-01

    The Mizunami Underground Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal procedure from

  3. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  4. Phase unwrapping algorithm based on multi-frequency fringe projection and fringe background for fringe projection profilometry

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Gu, Feifei; Ma, Yueyang

    2015-01-01

    A phase unwrapping algorithm specially designed for the phase-shifting fringe projection profilometry (FPP) is proposed. It combines a revised dual-frequency fringe projectionalgorithm and a proposed fringe background based quality guided phase unwrapping algorithm (FB-QGPUA). Phase demodulated from the high-frequency fringe patterns is partially unwrapped by that demodulated from the low-frequency ones. Then FB-QGPUA is adopted to further unwrap the partially unwrapped phase. Influences of the phase error on the measurement are researched. Strategy to select the fringe pitch is given. Experiments demonstrate that the proposed method is very robust and efficient. (paper)

  5. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  6. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  7. The international INTRAVAL project. Phase 2, Summary report

    International Nuclear Information System (INIS)

    Larsson, A.; Pers, K.; Skagius, K.; Dverstorp, B.

    1997-01-01

    The international project INTRAVAL addresses the validation of models of transport of radionuclides through groundwater in the geosphere. Such models are used in the assessment of the long-term safety of radioactive waste disposal systems. The second phase of INTRAVAL, which started in 1990, was concluded at the end of 1993. The objective of Phase 2 was to increase the understanding how various geophysical, geohydrological and geochemical phenomena of importance for radionuclide transport from a repository to the biosphere could be described by mathematical models and to study the model validation process. Summarized results from Phase 2 of the INTRAVAL study are presented in this report. (K.A.)

  8. Small car exposure data project. Phase 1 : methodology

    Science.gov (United States)

    1985-10-01

    The Small Car Exposure Data Project represents the first phase of an effort to build a data : base of exposure variables for crash-avoidance studies. Among these are: (1) vehicle make, : model, year, body style, wheel base, weight, and horsepower; (2...

  9. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  10. Horonobe Underground Research Laboratory project. Synthesis of phase II (construction phase) investigations to a depth of 350 m

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; Yokota, Hideharu; Aoyagi, Kazuhei; Ohno, Hirokazu; Shigeta, Naotaka; Hanamuro, Takahiro; Ito, Hiroaki

    2017-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350 m. Integration of work from different disciplines into a 'geosynthesis' ensures that the Phase II goals have been successfully achieved and identifies key issues that need to be addressed in the Phase II investigations. Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. (author)

  11. Deployable bamboo structure project: A building life-cycle report

    Science.gov (United States)

    Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.

    2017-11-01

    Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.

  12. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  13. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  14. Exposure Based Health Issues Project Report: Phase I of High Level Tank Operations, Retrieval, Pretreatment, and Vitrification Exposure Based Health Issues Analysis

    International Nuclear Information System (INIS)

    Stenner, Robert D.; Bowers, Harold N.; Kenoyer, Judson L.; Strenge, Dennis L.; Brady, William H.; Ladue, Buffi; Samuels, Joseph K.

    2001-01-01

    The Department of Energy (DOE) has the responsibility to understand the ''big picture'' of worker health and safety which includes fully recognizing the vulnerabilities and associated programs necessary to protect workers at the various DOE sites across the complex. Exposure analysis and medical surveillance are key aspects for understanding this big picture, as is understanding current health and safety practices and how they may need to change to relate to future health and safety management needs. The exposure-based health issues project was initiated to assemble the components necessary to understand potential exposure situations and their medical surveillance and clinical aspects. Phase I focused only on current Hanford tank farm operations and serves as a starting point for the overall project. It is also anticipated that once the pilot is fully developed for Hanford HLW (i.e., current operations, retrieval, pretreatment, vitrification, and disposal), the process and analysis methods developed will be available and applicable for other DOE operations and sites. The purpose of this Phase I project report is to present the health impact information collected regarding ongoing tank waste maintenance operations, show the various aspects of health and safety involved in protecting workers, introduce the reader to the kinds of information that will need to be analyzed in order to effectively manage worker safety

  15. INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, Y.

    1984-01-01

    The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach

  16. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  17. Current Situation of Highway Daily Maintenance Management in Beijing

    Directory of Open Access Journals (Sweden)

    Pan Feng Ming

    2016-01-01

    Full Text Available Combined with the industry property, characteristics and management needs of highway maintenance project in Beijing, through investigation and research of the highway daily maintenance management, the present situation of highway repair and maintenance is expounded from the aspects such as the determination of maintenance funds and plan, maintenance management mode, and so on. Then in order to explore the new mechanisms for market management of highway maintenance, the advantages and disadvantages of highway maintenance and minor repairment of Beijing are analyzed.

  18. Longitudinal Relationship between Plasma Reactive Oxygen Metabolites and Periodontal Condition in the Maintenance Phase of Periodontal Treatment

    Directory of Open Access Journals (Sweden)

    Tatsuya Machida

    2014-01-01

    Full Text Available Aim. The present cohort study describes the longitudinal relationship between plasma oxidative status and periodontitis progression during the maintenance phase of treatment. Materials and Methods. Forty-five patients (mean age 58.8 years were monitored from 2008 to 2013. Periodontal conditions, including probing pocket depth (PPD and clinical attachment level (CAL, were recorded. Measurements of plasma reactive oxygen metabolites (ROM and biologic antioxidant potential (BAP were performed to evaluate plasma oxidative status. The patients were assigned into 2 groups as low and high plasma ROM level using a cut-off value which was median of plasma ROM level at baseline. Results. In the subjects with low plasma ROM level at baseline, changes in mean CAL were positively correlated with changes in plasma ROM levels, bleeding on probing, and plaque control record, but not with PPD. In the subjects with high plasma ROM at baseline, changes in CAL were significantly associated with only PPD at baseline. On the other hands there were no significant associations between changes in CAL and those in plasma BAP levels. Conclusions. When plasma ROM level in periodontitis patients was low, increases in plasma ROM level were associated with those in CAL during the maintenance phase of treatment.

  19. Brazilian Decimetric Array (BDA) project - Phase II

    Science.gov (United States)

    Faria, C.; Stephany, S.; Sawant, H. S.; Cecatto, J. R.; Fernandes, F. C. R.

    2010-02-01

    The configuration of the second phase of the Brazilian Decimetric Array (BDA), installed at Cachoeira Paulista, Brazil (Longitude 45° 0‧ 20″ W and Latitude 22° 41‧ 19″ S), is a T-shaped array where 21 antennas are being added to existing 5 antennas of the first phase. In the third phase, in each arm of the T array, four more antennas will be added and baselines will be increased to 2.5 × 1.25 km in east-west and south directions, respectively. The antennas will be equally spaced at the distances of 250 meters from the central antenna of the T-array. Also, the frequency range will be increased to 1.2-1.7, 2.8 and 5.6 GHz. The Second phase of the BDA should be operational by the middle of 2010 and will operate in the frequency range of (1.2-1.7) GHz for solar and non solar observations. Here, we present the characteristics of the second phase of the BDA project, details of the array configuration, the u-v coverage, the synthesized beam obtained for the proposed configuration.

  20. Photovoltaic power plants maintenance; El mantenimiento en plantas fotovoltaicas

    Energy Technology Data Exchange (ETDEWEB)

    Suanzes, F.; Rodelgo, I.

    2010-07-01

    It is reviewed the evolution of the maintenance contracts in solar facilities in a young environment and with a large projection. Thus, is described the preventive maintenance in this kind of facilities, and are also analyzed the most relevant cases of corrective maintenance. (Author)

  1. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  2. Summer Student Work Project Report: SCADA Bridge Tool Development Automatically Capturing Data from SCADA to the Maintenance System

    CERN Document Server

    Alhambra-Moron, Alfonso

    2015-01-01

    The main purpose of this report is to summarize the work project I have been doing at CERN during the last 3 months as a Summer Student. My name is Alfonso Alhambra Morón and the 8th of June 2015 I joined the EN-HE-LM team as a summer student supervised by Damien Lafarge in order to collaborate in the automation of the transfer of meter readings from SCADA1 to Infor EAM2, the computerized maintenance management system at CERN. The main objective of my project was to enable the automatic updates of meters in Infor EAM fetching data from SCADA so as to automatize a process which was done manually before and consumed resources in terms of having to consult the meter physically, import this information to Infor EAM by hand and detecting and correcting the errors that can occur when doing all of this manually. This problem is shared by several other teams at CERN apart from the Lift Maintenance team and for this reason the main target I had when developing my solution was flexibility and scalability so as to make...

  3. CLEAN-ROADS project: air quality considerations after the application of a novel MDSS on winter road maintenance activities

    Science.gov (United States)

    Pretto, Ilaria; Malloci, Elisa; Tonidandel, Gabriele; Benedetti, Guido; Di Napoli, Claudia; Piazza, Andrea; Apolloni, Roberto; Cavaliere, Roberto

    2016-04-01

    With this poster we present the environmental benefit on air quality derived by the application of the CLEAN-ROADS pilot project. The CLEAN-ROADS project addresses the problem of the environmental pollution caused by de-icing salts during winter road maintenance activities in the Province of Trento (Italy). A demonstrative Maintenance Decision Support System (MDSS) has been developed in order to improve the intervention procedures of the road management service. Specifically it aims to optimize the efficiency of how available resources (e.g., salt consumption) are currently used while guaranteeing the current level of road safety. The CLEAN-ROADS project has been tested and validated on a test area located in a valley bottom (Adige Valley), where the highest optimization margins are to be expected. The project supports current road maintenance practices, which has proved to be reliable and accurate, with a new scalable and energy-efficient road monitoring system. This system is based on a network of road weather stations (road weather information system, RWIS) installed on the test route. It is capable to collect real-time data about the road conditions and to perform short-term and now-cast road weather forecasts, which actively integrate weather data and bulletins covering the target area [1]. This poster presents the results obtained from a three-year monitoring activity with the aim to (1) determine the impact of de-icing salts on air quality and (2) quantify the improvements obtained by the application of the CLEAN-ROADS project on air quality. The Ambient Air Quality and Cleaner Air for Europe Directive (2008/50/EC) states that contributions to exceedances of particulate matter PM10 limit values that are attributable to road winter salting may be subtracted when assessing compliance with air quality limit values, once provided that reasonable measures have been taken to lower concentrations [2]. As the de-icing salts used in road maintenance are mainly based

  4. CEC project Mirage - Second phase on migration of radionuclides in the geosphere

    International Nuclear Information System (INIS)

    Come, B.

    1989-01-01

    A second phase of the Community coordinated project Mirage (migration of radionuclides in the geosphere) was launched in 1986. The present report brings together reviews of work done in the four research areas of this phase for 1988, and therefore constitues an update of the previous report, ref. EUR 11589. This project is part of the CEC R and D programme on radioactive waste management (1985-89)

  5. High precision capacitive beam phase probe for KHIMA project

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ji-Gwang, E-mail: windy206@hanmail.net [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Yang, Tae-Keun [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Forck, Peter [GSI Helmholtz Centre for Ion Research, Darmstadt 64291, German (Germany)

    2016-11-21

    In the medium energy beam transport (MEBT) line of KHIMA project, a high precision beam phase probe monitor is required for a precise tuning of RF phase and amplitude of Radio Frequency Quadrupole (RFQ) accelerator and IH-DTL linac. It is also used for measuring a kinetic energy of ion beam by time-of-flight (TOF) method using two phase probes. The capacitive beam phase probe has been developed. The electromagnetic design of the high precision phase probe was performed to satisfy the phase resolution of 1° (@200 MHz). It was confirmed by the test result using a wire test bench. The measured phase accuracy of the fabricated phase probe is 1.19 ps. The pre-amplifier electronics with the 0.125 ∼ 1.61 GHz broad-band was designed and fabricated for amplifying the signal strength. The results of RF frequency and beam energy measurement using a proton beam from the cyclotron in KIRAMS is presented.

  6. 18 CFR 12.12 - Maintenance of records.

    Science.gov (United States)

    2010-04-01

    ... Reports and Records § 12.12 Maintenance of records. (a) Kinds of records—1) General rule. Except as... excavation), plans and specifications, inspection and quality control reports, as built construction drawings... maintenance of the project, including continuously maintained tabular records and graphs illustrating the data...

  7. Louisiana DOTD maintenance budget allocation system: final report.

    Science.gov (United States)

    2002-11-01

    This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...

  8. ADS project in the Vinca Institute

    International Nuclear Information System (INIS)

    Pesic, M.; Neskovic, N.; Plecas, I.

    1999-01-01

    Among the six scientific programmes proposed for future research in the Vinca Institute, the nuclear one is connected to the nuclear reactors and waste management activities. One of the projects within the nuclear programme is associated to a proposal for designing a small modern subcritical research reactor driven by an accelerator beam. The idea of this Project is based on the facts that the construction of the Tesla accelerator installation is in the final phase and that a rich experience is gained in design, construction, operation and maintenance of both research reactors in the Institute in the last 40 years. Preliminary scope of the ADS project in the Vinca Institute, including some details and options, are given (author)

  9. Fringe order error in multifrequency fringe projection phase unwrapping: reason and correction.

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhang, Lu

    2015-11-10

    A multifrequency fringe projection phase unwrapping algorithm (MFPPUA) is important to fringe projection profilometry, especially when a discontinuous object is measured. However, a fringe order error (FOE) may occur when MFPPUA is adopted. An FOE will result in error to the unwrapped phase. Although this kind of phase error does not spread, it brings error to the eventual 3D measurement results. Therefore, an FOE or its adverse influence should be obviated. In this paper, reasons for the occurrence of an FOE are theoretically analyzed and experimentally explored. Methods to correct the phase error caused by an FOE are proposed. Experimental results demonstrate that the proposed methods are valid in eliminating the adverse influence of an FOE.

  10. The advanced software development workstation project

    Science.gov (United States)

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  11. Maintenance Approaches for Different Production Methods

    Directory of Open Access Journals (Sweden)

    Mungani, Dzivhuluwani Simon

    2013-11-01

    Full Text Available Various production methods are used in industry to manufacture or produce a variety of products needed by industry and consumers. The nature of a product determines which production method is most suitable or cost-effective. A continuous process is typically used to produce large volumes of liquids or gases. Batch processing is often used for small volumes, such as pharmaceutical products. This paper discusses a research project to determine the relationship between maintenance approaches and production methods. A survey was done to determine to what extent three maintenance approaches reliability-centred maintenance (RCM, total productive maintenance (TPM, and business-centred maintenance (BCM are used for three different processing methods (continuous process, batch process, and a production line method.

  12. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  13. Protracted Administration of L-Asparaginase in Maintenance Phase Is the Risk Factor for Hyperglycemia in Older Patients with Pediatric Acute Lymphoblastic Leukemia

    Science.gov (United States)

    Yoshida, Hideki; Imamura, Toshihiko; Saito, Akiko M.; Takahashi, Yoshihiro; Suenobu, So-ichi; Hasegawa, Daiichiro; Deguchi, Takao; Hashii, Yoshiko; Kawasaki, Hirohide; Endo, Mikiya; Hori, Hiroki; Suzuki, Nobuhiro; Kosaka, Yoshiyuki; Kato, Koji; Yumura-Yagi, Keiko; Hara, Junichi; Oda, Megumi; Sato, Atsushi; Horibe, Keizo

    2015-01-01

    Although L-asparaginase related hyperglycemia is well known adverse event, it is not studied whether the profile of this adverse event is affected by intensification of L-asparaginase administration. Here, we analyzed the profile of L-asparaginase related hyperglycemia in a 1,176 patients with pediatric acute lymphoblastic leukemia treated according to the Japan Association of Childhood Leukemia Study ALL-02 protocol using protracted L-asparaginase administration in maintenance phase. We determined that a total of 75 L-asparaginase related hyperglycemia events occurred in 69 patients. Although 17 events (17/1176, 1.4%) developed in induction phase, which was lower incidence than those (10–15%) in previous reports, 45 events developed during the maintenance phase with protracted L-asparaginase administration. Multivariate analysis showed that older age at onset (≥10 years) was a sole independent risk factor for L-asparaginase-related hyperglycemia (Phyperglycemia. These findings suggest that protracted administration of L-asparaginase is the risk factor for hyperglycemia when treating adolescent and young adult acute lymphoblastic leukemia patients. PMID:26317422

  14. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  15. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  16. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  17. RF Phase Reference Distribution System for the TESLA Technology Based Projects

    CERN Document Server

    Czuba, K; Romaniuk, R S

    2013-01-01

    Since many decades physicists have been building particle accelerators and usually new projects became more advanced, more complicated and larger than predecessors. The importance and complexity of the phase reference distribution systems used in these accelerators have grown significantly during recent years. Amongst the most advanced of currently developed accelerators are projects based on the TESLA technology. These projects require synchronization of many RF devices with accuracy reaching femtosecond levels over kilometre distances. Design of a phase reference distribution system fulfilling such requirements is a challenging scientific task. There are many interdisciplinary problems which must be solved during the system design. Many, usually negligible issues, may became very important in such system. Furthermore, the design of a distribution system on a scale required for the TESLA technology based projects is a new challenge and there is almost no literature sufficiently covering this subject. This th...

  18. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  19. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    Science.gov (United States)

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  20. Multiple Learning Strategies Project. Building Maintenance & Engineering. Regular Vocational. [Vol. 2.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…

  1. Individualized Inservice Teacher Education (Project In-Step). Evaluation Report. Phase III.

    Science.gov (United States)

    Thurber, John C.

    This is a report on the third phase of Project IN-STEP, which was intended to develop a viable model for individualized, multi-media in-service teacher education programs. (Phase I and II are reported in ED 033 905, and ED 042 709). The rationale for Phase III was to see if the model could be successfully transferred to an area other than teaching…

  2. Multiple Learning Strategies Project. Building Maintenance & Engineering. Low Reader. [Vol. 2.

    Science.gov (United States)

    Steinberg, A.; And Others

    This instructional package is one of two designed for low reader students (those reading at grade level 3-6) in the vocational area of building maintenance and engineering. The forty-four learning modules are organized into eleven units: chalkboards; carpet care; office cleaning; grounds; sanitation; boiler maintenance and operation; power and…

  3. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  4. State partnership in environmental health and safety phase of Plowshare projects

    Energy Technology Data Exchange (ETDEWEB)

    Kinsman, S [California State Department of Public Health, Berkeley, CA (United States)

    1969-07-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  5. State partnership in environmental health and safety phase of Plowshare projects

    International Nuclear Information System (INIS)

    Kinsman, S.

    1969-01-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  6. Investigation of an innovative maintenance contracting strategy : the performance-based maintenance contract (PBMC).

    Science.gov (United States)

    2015-06-01

    One of the major responsibilities of state Departments of Transportation (DOTs) is to maintain their road assets so : that road users can travel cost effectively, safely, and in a timely manner. Maintenance projects can be performed : either by using...

  7. Multiple Learning Strategies Project. Building Maintenance & Engineering. Low Reader. [Vol. 1.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of two designed for low reader students (those reading at a 3-6 grade level) in the vocational area of building maintenance and engineering. The forty-six learning modules are organized into three units: floor care; general maintenance tasks; and restrooms. Each module includes these elements: a performance…

  8. Maintenance in nuclear production power plants

    International Nuclear Information System (INIS)

    Lozano, J. M.

    2010-01-01

    This article highlights the importance and quality of maintenance in the complete phases of development, in a sector which has been often questioned by the public opinion, and that is always subject to national and international standards. The aim of maintenance is to guarantee the production of electric power in a reliable, safe, economic and friendly environmentally way, assuring a long-term production. (Author)

  9. Review of maintenance personnel practices at nuclear power plants

    International Nuclear Information System (INIS)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations

  10. Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Science.gov (United States)

    Valoppi, Laura

    2018-04-02

    Wildlife, the Santa Clara Valley Water District, the U.S. Army Corps of Engineers, and the U.S. Fish and Wildlife Service.To implement the AMP, the PMT have selected and funded applied studies and monitoring projects to address key uncertainties. This information is used by the PMT to make decisions about current management of the project area and future restoration actions in order to meet project.This document summarizes the major scientific findings from studies conducted from 2009 to 2016, as part of the science program that was conducted in conjunction with Phase 1 restoration and management actions. Additionally, this report summarizes the management response to the study results under the guidance of the AMP framework and provides a list of suggested studies to be conducted in “Phase 2–A scorecard summarizing the Project’s progress toward meeting the AMP goals for a range of Project objectives.” The scoring to date indicates that the Project is meeting or exceeding expectations for sediment accretion and western snowy plover (Charadrius alexandrinus nivosus) recovery. There is uncertainty with respect to objectives for California gulls (Larus californicus), California least tern (Sternula antillarum), steelhead trout (Oncorhynchus mykiss), and regulatory water quality objectives. Water quality and algal blooms, specifically of the managed ponds, is indicated as trending negative. However, the vast majority of objectives are trending positive, including increased abundance for a number of bird guilds, increasing marsh habitat, maintenance of mudflats, visitor experience, estuarine fish numbers, and special-status marsh species numbers.

  11. Are cognitive "insomnia" processes involved in the development and maintenance of delayed sleep wake phase disorder?

    Science.gov (United States)

    Richardson, Cele E; Gradisar, Michael; Barbero, Sebastian C

    2016-04-01

    Although individuals with delayed sleep wake phase disorder (DSWPD) and chronic insomnia disorder (CID) share many of the same phenomenological experiences, theories relating to the development and maintenance of these disorders are distinct in focus. Unlike CID, theory relating to DSWPD is primarily physiologically based and assumes almost no cognitive pathway. However, recent research findings suggest that individuals with DSWPD also display many of the sleep-disordered cognitive processes that were previously assumed to be unique to the insomnia experience. As such, this review aims to summarise current research findings to address the question "Could cognitive processes be involved in the development and maintenance of DSWPD?" In particular, the presence of cognitive and physiological pre-sleep arousal, sleep-related attentional bias, distorted perception of sleep and daytime functioning, dysfunctional beliefs and safety behaviours will be investigated. As this emerging area of research requires a stronger evidence base, we highlight suggestions for future investigation and provide preliminary practice points for clinicians assessing and treating "insomnia" in patients with DSWPD. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. 7 CFR 654.12 - Financing operations and maintenance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Financing operations and maintenance. 654.12 Section 654.12 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES... Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed to...

  13. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  14. Project inspection using mobile technology - phase II : assessing the impacts of mobile technology on project inspection.

    Science.gov (United States)

    2015-01-01

    As mobile technology becomes widely available and affordable, transportation agencies can use this : technology to streamline operations involved within project inspection. This research, conducted in two : phases, identified opportunities for proces...

  15. The divertor remote maintenance project

    International Nuclear Information System (INIS)

    Maisonnier, D.; Martin, E.; Akou, K.

    2001-01-01

    Remote replacement of the ITER divertor will be required several times during the life of ITER. To facilitate its regular exchange, the divertor is assembled in the ITER vacuum vessel from 60 cassettes. Radial movers transport each cassette along radial rails through the handling ports and into the vessel where a toroidal mover lifts and transports the cassette around a pair of toroidal rails. Once at its final position the cassette is locked to the toroidal rails and is accurately aligned in both poloidal and toroidal directions. A further requirement on the divertor is to minimise the amount of activated waste to be sent to a repository. To this end the cassettes have been designed to allow the remote replacement, in a hot cell, of their plasma facing components. The paper describes the two facilities built at ENEA Brasimone, Italy, whose aim is to demonstrate the reliable remote maintenance of the divertor cassettes. (author)

  16. The divertor remote maintenance project

    International Nuclear Information System (INIS)

    Maisonnier, D.; Martin, E.; Akou, K.

    1999-01-01

    Remote replacement of the ITER divertor will be required several times during the life of ITER. To facilitate its regular exchange, the divertor is assembled in the ITER vacuum vessel from 60 cassettes. Radial movers transport each cassette along radial rails through the handling ports and into the vessel where a toroidal mover lifts and transports the cassette around a pair of toroidal rails. Once at its final position the cassette is locked to the toroidal rails and is accurately aligned in both poloidal and toroidal directions. A further requirement on the divertor is to minimise the amount of activated waste to be sent to a repository. To this end the cassettes have been designed to allow the remote replacement, in a hot cell, of their plasma facing components. The paper describes the two facilities built at ENEA Brasimone, Italy, whose aim is to demonstrate the reliable remote maintenance of the divertor cassettes. (author)

  17. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  18. Individualized In-Service Teacher Education. (Project IN-STEP). Evaluation Report, Phase II.

    Science.gov (United States)

    Thurber, John C.

    Phase 2 of Project IN-STEP was conducted to revise, refine, and conduct further field testing of a new inservice teacher education model. The method developed (in Phase 1--see ED 003 905 for report) is an individualized, multi-media approach. Revision activities, based on feedback provided for Phase 1, include the remaking of six videotape…

  19. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  20. Image/patient registration from (partial) projection data by the Fourier phase matching method

    International Nuclear Information System (INIS)

    Weiguo Lu; You, J.

    1999-01-01

    A technique for 2D or 3D image/patient registration, PFPM (projection based Fourier phase matching method), is proposed. This technique provides image/patient registration directly from sequential tomographic projection data. The method can also deal with image files by generating 2D Radon transforms slice by slice. The registration in projection space is done by calculating a Fourier invariant (FI) descriptor for each one-dimensional projection datum, and then registering the FI descriptor by the Fourier phase matching (FPM) method. The algorithm has been tested on both synthetic and experimental data. When dealing with translated, rotated and uniformly scaled 2D image registration, the performance of the PFPM method is comparable to that of the IFPM (image based Fourier phase matching) method in robustness, efficiency, insensitivity to the offset between images, and registration time. The advantages of the former are that subpixel resolution is feasible, and it is more insensitive to image noise due to the averaging effect of the projection acquisition. Furthermore, the PFPM method offers the ability to generalize to 3D image/patient registration and to register partial projection data. By applying patient registration directly from tomographic projection data, image reconstruction is not needed in the therapy set-up verification, thus reducing computational time and artefacts. In addition, real time registration is feasible. Registration from partial projection data meets the geometry and dose requirements in many application cases and makes dynamic set-up verification possible in tomotherapy. (author)

  1. Phase retrieval with the reverse projection method in the presence of object's scattering

    International Nuclear Information System (INIS)

    Wang, Zhili; Gao, Kun; Wang, Dajiang

    2017-01-01

    X-ray grating interferometry can provide substantially increased contrast over traditional attenuation-based techniques in biomedical applications, and therefore novel and complementary information. Recently, special attention has been paid to quantitative phase retrieval in X-ray grating interferometry, which is mandatory to perform phase tomography, to achieve material identification, etc. An innovative approach, dubbed “Reverse Projection” (RP), has been developed for quantitative phase retrieval. The RP method abandons grating scanning completely, and is thus advantageous in terms of higher efficiency and reduced radiation damage. Therefore, it is expected that this novel method would find its potential in preclinical and clinical implementations. Strictly speaking, the reverse projection method is applicable for objects exhibiting only absorption and refraction. In this contribution, we discuss the phase retrieval with the reverse projection method for general objects with absorption, refraction and scattering simultaneously. Especially, we investigate the influence of the object's scattering on the retrieved refraction signal. Both theoretical analysis and numerical experiments are performed. The results show that the retrieved refraction signal is the product of object's refraction and scattering signals for small values. In the case of a strong scattering, the reverse projection method cannot provide reliable phase retrieval. Those presented results will guide the use of the reverse projection method for future practical applications, and help to explain some possible artifacts in the retrieved images and/or reconstructed slices. - Highlights: • Accurate phase retrieval by the reverse projection method without object's scattering. • Retrieved refraction signal contaminated by the object's scattering. • Refraction signal underestimated by the reverse projection method. • Guide the use of the reverse projection method for

  2. Tofacitinib for induction and maintenance therapy of Crohn's disease: results of two phase IIb randomised placebo-controlled trials.

    Science.gov (United States)

    Panés, Julian; Sandborn, William J; Schreiber, Stefan; Sands, Bruce E; Vermeire, Séverine; D'Haens, Geert; Panaccione, Remo; Higgins, Peter D R; Colombel, Jean-Frederic; Feagan, Brian G; Chan, Gary; Moscariello, Michele; Wang, Wenjin; Niezychowski, Wojciech; Marren, Amy; Healey, Paul; Maller, Eric

    2017-06-01

    Tofacitinib is an oral, small-molecule Janus kinase inhibitor that is being investigated for IBD. We evaluated the efficacy and safety of tofacitinib for induction and maintenance treatment in patients with moderate-to-severe Crohn's disease (CD). We conducted two randomised, double-blind, placebo-controlled, multicentre phase IIb studies. Adult patients with moderate-to-severe CD were randomised to receive induction treatment with placebo, tofacitinib 5 or 10 mg twice daily for 8 weeks. Those achieving clinical response-100 or remission were re-randomised to maintenance treatment with placebo, tofacitinib 5 or 10 mg twice daily for 26 weeks. Primary endpoints were clinical remission at the end of the induction study, and clinical response-100 or remission at the end of the maintenance study. 180/280 patients randomised in the induction study were enrolled in the maintenance study. At week 8 of induction, the proportion of patients with clinical remission was 43.5% and 43.0% with 5 and 10 mg twice daily, respectively, compared with 36.7% in the placebo group (p=0.325 and 0.392 for 5 and 10 mg twice daily vs placebo). At week 26 of maintenance, the proportion of patients with clinical response-100 or remission was 55.8% with tofacitinib 10 mg twice daily compared with 39.5% with tofacitinib 5 mg twice daily and 38.1% with placebo (p=0.130 for 10 mg twice daily vs placebo). Compared with placebo, the change in C-reactive protein from baseline was statistically significant (ptofacitinib. NCT01393626 and NCT01393899. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  3. W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition

    Energy Technology Data Exchange (ETDEWEB)

    Armpriester, Anthony; Smith, Roger; Scheriffius, Jeff; Smyth, Rebecca; Istre, Michael

    2014-02-01

    For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy, Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: • Phase I. Project Definition/Front-End Engineering Design (FEED) • Phase ll. Detailed Engineering, Procurement & Construction • Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and

  4. Considerations in the development and implementation of a maintenance robot for nuclear power facilities

    International Nuclear Information System (INIS)

    Rohrabacher, A.; Carlton, R.; Gelhaus, F.

    1987-01-01

    The Nuclear Power Division of the Electric Power Research Institute (EPRI) began its automated nuclear plant maintenance research (research project 2232) in 1982 with surveys of domestic and Japanese ongoing and potential uses of robotic systems in nuclear power facilities. After studying these potential research areas, EPRI initiated a three-pronged effort. All surveys concluded that a mobile system for general environmental, visual, and auto surveillance would be beneficial, and EPRI contracted for the development and evaluation of the Surveyor robot. Work also began to catalog existing systems and to quantify the methodology that a utility could use to optimally complete the plant-mission, robot-system selection process. The conceptualizing phase of the effort defined the necessary physical attributes for the machine to perform a variety of maintenance tasks. Characteristics such as mobility, strength, conditions of service, materials of construction, tool functional requirements, facility interfaces, and operator interface were defined to the extent practical. Substantial versatility is required for the variability of the targeted maintenance tasks and for the variability of facility layouts and designs found throughout the nuclear industry. A key contribution to this development effort comes from the project's Utility Advisors Group. The contract's host utility provides membership to lead this group, and that company will train in the use of the machine for 6 months prior to utilizing it in their power plant for 2 yr

  5. Rituximab Maintenance Treatment of Relapsed/Resistant Follicular Non-Hodgkin's Lymphoma: Long-Term Outcome of the EORTC 20981 Phase III Randomized Intergroup Study

    NARCIS (Netherlands)

    van Oers, Marinus H. J.; van Glabbeke, Martine; Giurgea, Livia; Klasa, Richard; Marcus, Robert E.; Wolf, Max; Kimby, Eva; van 't Veer, Mars; Vranovsky, Andrej; Holte, Harald; Hagenbeek, Anton

    2010-01-01

    Purpose In 2006, we published the results of the European Organisation for Research and Treatment of Cancer phase III trial EORTC 20981 on the role of rituximab in remission induction and maintenance treatment of relapsed/resistant follicular lymphoma (FL). At that time, the median follow-up for the

  6. L'externalisation de la maintenance

    CERN Document Server

    Véret, Daniele

    2003-01-01

    La maintenance évolue ! De plus en plus d'entreprises externalisent tout ou partie des tâches ou fonctions de la maintenance à des prestataires. Dans ces conditions, une relation d confiance doit s'établir entre le donneur d'ordres et le prestataire, qui se traduira par un contrat respectant les intérêts de chacun. L'externalisation de la maintenance apporte les réponses à toutes les questions qui se posent lors de l'élaboration du cahier des charges et de la phase précontractuelle, afin de bien préciser les exigences à satisfaire. Vous trouverez les réponses à toutes vos questions et même à celles auxquelles vous n'aviez pas pensé ! - Jusqu'où va la notion d'externalisation ? - Quels sont les risques d'une mauvaise définition de la phase précontractuelle ? - Quels modes de relation contractuelle peut-on rencontrer ? - En quoi consistent les astreintes ? - Qu'est-ce que la sous-traitante ? - Qu'est-ce qu'un cahier des charges ? - Quelles sont les relations entre le donneur d'ordres et le p...

  7. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  8. Advanced Petroleum-Based Fuels -- Diesel Emissions Control Project (APBF-DEC): Lubricants Project, Phase 2 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    2006-06-01

    This report summarizes the results of the second phase of a lubricants project, which investigated the impact of engine oil formulation on diesel vehicle emissions and the performance of a nitrogen oxide adsorber catalyst (NAC).

  9. Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquat

  10. Maintenance Decision Support System, Phase III

    Science.gov (United States)

    2017-09-01

    The main goal of the project was to address barriers that limit NDOTs ability to implement MDSS and MMS systems. The four project tasks included: Task 1: Develop system for tracking sand and/or deicing material usage: A system that tracks where and w...

  11. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  12. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  13. Planning factors for developing an enterprise-wide picture archiving and communication system maintenance program.

    Science.gov (United States)

    Staley, S; Romlein, J; Chacko, A K; Wider, R

    2000-05-01

    Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.

  14. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    The Maintenance Proficiency Evaluation Test Bank (MPETB) is an Electric Power Research Institute- (EPRJ-) operated, utility-sponsored means of developing, maintaining, and disseminating secure, high-quality written and performance maintenance proficiency tests. EPRTs charter is to ensure that all tests and test items that go into the Test Bank have been validated, screened for reliability, and evaluated to high standards of psychometric excellence. Proficiency tests of maintenance personnel.(mechanics, electricians, and instrumentation and control [I and C] technicians) are most often used to determine if an experienced employee is capable of performing maintenance tasks without further training. Such tests provide objective evidence for decisions to exempt an employee from what, for the employee, is unnecessary training. This leads to considerable savings in training costs and increased productivity because supervisors can assign personnel to tasks at which their competence is proven. The ultimate objective of proficiency evaluation is to ensure that qualified maintenance personnel are available to meet the maintenance requirements of the plant Numerous task-specific MPE tests (both written and performance) have been developed and validated using the EPRI MPE methodology by the utilities participating in the MPETB project A task-specific MPE consists of a multiple-choice written examination and a multi-step performance evaluation that can be used to assess an individual's present knowledge and skill level for a given maintenance task. The MPETB contains MPEs and test items for the mechanical, electrical, and I and C classifications that are readily available to participating utilities. Presently, utilities are placing emphasis on developing MPEs to evaluate outage-related maintenance tasks that demonstrate the competency and qualifications of plant and contractor personnel before the start of outage work. Utilities are also using the MPE methodology and process to

  15. Interest groups, the Lesotho Highlands Water Project Phase 1

    African Journals Online (AJOL)

    interest groups can bring about changes in the water policy arena. ... Lesotho Highlands Water Project Phase 1 as a case study. ... attempts to influence public policy and their representation ... ties concern the relations between state actors and non-state ..... 'bears responsibility here [LHWP], since it is the sponsor of.

  16. A phased approach to cooperative environmental management R ampersand D projects with Russian institutes

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Albert, T.E.

    1994-01-01

    An important aspect of technology exchange between the US and the Former Society Union (FSU) countries is the identification and implementation of cooperative projects that are mutually beneficial. The US Department of Energy (DOE) and its national laboratories have established a four-phase approach to identify and further develop Russian technologies that could contribute to solving DOE environmental management problems. Following an initial screening and identification of potential technologies, the country-to-country interaction is formally initiated in the first phase through a small-scale pilot project study. This phase consists of an evaluation of the specific technology for DOE applications, and provides an opportunity for both US and Russian scientists and engineers to validate the use of the technology for a specific DOE requirement. The successful completion of this phase establishes the basis for continuing the technology development into the second phase, which includes laboratory testing in Russia. In the third phase, the technology is laboratory tested in the US, most likely at those DOE national laboratories having the capability and greatest interest in the particular technology area. The fourth and final phase consist of a commercialization process that establishes a partnership with a US business to finalize development of the technology and to prepare for implementation within the DOE complex. An example of this phased approach is a current high-level waste separation cooperative project between the Khlopin Radium Institute and the DOE through Sandia National Laboratories (SNL) and Science Applications International Corporation (SAIC). This effort has not only enhanced separations technology for the DOE, but has also provided an example of a working process for future cooperative projects

  17. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  18. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  19. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  20. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  1. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  2. Retention factors of management staff in the maintenance phase of their careers in local government

    Directory of Open Access Journals (Sweden)

    Mervin Munsamy

    2009-10-01

    Full Text Available Organisations require an employer value proposition (EVP to attract and retain people in management. This study was undertaken to understand the key retention factors that influence experienced management employees, in the maintenance phase of their careers, to remain employed at a local government organisation. Retention factors inform the organisation’s EVP. A qualitative, empirical-analytical research paradigm with a modernist approach was adopted. Data were obtained through purposive sampling (n = 10 by way of semi-structured interviews. A theoretical framework was used against which data could be deducted and compared. Sixteen key factors were identified, of which Job Aligned with Personal Meaning or Passion emerged as the strongest retention factor among the study’s participants.

  3. The third phase of the OECD/NEA TDB project: TDB III

    International Nuclear Information System (INIS)

    Mompean, F.J.; Illemassene, M.; Perrone, J.

    2005-01-01

    In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)

  4. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  5. The implementation goals of geoinformation support to planning and spatial management at the local level in the framework of the ONIX project

    Directory of Open Access Journals (Sweden)

    Franc J. Zakrajšek

    1999-01-01

    Full Text Available The project objective is to strengthen the development, establishment, maintenance and use of the geographical data bases in the processes of physical planning and urban management on local level. It is a part of the Slovenian environmental project Onix. The current state is the phase of implementation.

  6. Hydrogeological characterization on surface-based investigation phase in the Mizunami underground research laboratory project, in Japan

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Takeuchi, Shinji; Takeuchi, Ryuji; Ohyama, Takuya

    2007-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being carried out by Japan Atomic Energy Agency in the Cretaceous Toki granite in the Tono area, central Japan. The MIU project is a purpose-built generic underground research laboratory project that is planned for a broad scientific study of the deep geological environment as a basis of research and development for geological disposal of nuclear wastes. One of the main goals of the MIU project is to establish comprehensive techniques for investigation, analysis, and assessment of the deep geological environment. The MIU project has three overlapping phases: Surface-based Investigation (Phase I), Construction (Phase II) and Operation (Phase III). Hydrogeological investigations using a stepwise process in Phase I have been carried out in order to obtain information on important properties such as, location of water conducting features, hydraulic conductivity and so on. Hydrogeological modeling and groundwater flow simulations in Phase I have been carried out in order to synthesize these investigation results, to evaluate the uncertainty of the hydrogeological model and to identify the main issues for further investigations. Using the stepwise hydrogeological characterization approach and combining the investigation with modeling and simulation, understanding of the hydrogeological environment has been progressively improved. (authors)

  7. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  8. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  9. Multiple Learning Strategies Project. Building Maintenance & Engineering. Educable Mentally Impaired. [Vol. 2.

    Science.gov (United States)

    Constantini, Debra; And Others

    This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty-four learning modules are organized into six units: general maintenance tasks; restrooms; chalkboards; carpet care; office cleaning; and grounds. Each module includes these elements:…

  10. Remediation of Gremikha Coastal maintenance base - status of the project

    International Nuclear Information System (INIS)

    Pillette-Cousin, L.; Stepennov, B.S.; Gorbatchev, A.

    2008-01-01

    The former coastal maintenance base in Gremikha is located in the Kola Peninsula, along the Barents Sea, about 300 km east from Murmansk. There is no road or railway to get there, therefore the only possible connection is either by sea or by helicopter. Remediation of the Gremikha coastal maintenance base (CMB) is now one of the main priorities for Rosatom (the Agency for Atomic Energy of the Russian Federation) because nuclear and radioactive waste are currently stored in conditions which do not meet the up-to-date safety and regulatory requirements and it might represent an environmental hazard and a risk of misappropriation of the nuclear material stored there. (authors)

  11. Hotspot and sampling analysis for effective maintenance and performance monitoring.

    Science.gov (United States)

    2017-05-01

    In this project, we propose two sampling methods addressing how much and where the agencies need to collect infrastraucture condition data for accurate Level-of-Maintenance (LOM) estimation in maintenance network with single type or multiple ty...

  12. Multiple Learning Strategies Project. Building Maintenance & Engineering. Educable Mentally Impaired. [Vol. 1.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty learning modules are organized into two units: floor care and general maintenance tasks. Each module includes these elements: a performance objective page which tells the student…

  13. Phase 2 of the Nea TDB project and some lessons learned from the use of phase 1 data

    International Nuclear Information System (INIS)

    Spahiu, K.

    2002-01-01

    As the five initial reviews of the TDB Project come to their conclusion, the negotiations for an independently funded continuation of the TDB Project through two meetings of an ad hoc group were completed in late 1997. The participating organisations are ANSTO (Australia), NIRAS/ONDRAF (Belgium), RAWRA (Czech Republic), POSIVA (Finland), ANDRA and IPSN (France), FZK (Germany), JNC/PNC (Japan), ENRESA (Spain), SKB and SKI (Sweden), HSK, NAGRA and PSI (Switzerland), BNFL and NIREX (UK) and the DOE (USA). This project is referred to as the TDB Phase II Project, or simply TDB II. The following new reviews will be performed within this project: - an update of the existing U/Am/Tc/Np/Pu reviews (one review team for all elements); - the inorganic chemistry of Ni; - the inorganic chemistry of Se; - the complexation of selected simple organic ligands (ISA, EDTA, citrate and oxalate) with U, Am, Tc, Np, Pu, Ni, Se, Zr and some selected competing cations; the inorganic chemistry of Zr. These review areas have been decided on taking into account the toxicity, mobility, radioactivity and half-lives of the commonly occurring nuclides in radioactive waste, as well as the particular areas of interest of the funding organisations. To avoid the delays that have plagued Phase I, the organisation of the TDB Project has been restructured, and the funding provided has been calculated to cover all necessary expenses for the project. (author)

  14. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Baldock, Nick [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Sevilla, Fernando [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Redfern, Robin [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Storey, Alexis [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Kempenaar, Anton [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Elkinton, Chris [Garrad Hassan America, Inc., San Diego, CA (United States)

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  15. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  16. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  17. Training survey -- educational profile for Hanford HANDI 2000 project

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    Fluor Daniel Hanford, Inc. (FDH) is currently adopting streamlined business processes through integrated software solutions. Replacing the legacy software (current/replacement systems, attached) also avoids significant maintenance required to resolve Year 2000 issues. This initiative is being referred to as `HANDI 2000`. The software being implemented in the first phase of this project includes Indus International`s PASSPORT Software, Peoplesoft and Primavera P3 Software. The project, which encompasses all the system replacements that will occur, has been named `HANDI 2000.` The PASSPORT applications being implemented are Inventory Management, Purchasing, Contract Management, Accounts Payable, and MSDS (Material Safety Data Sheets).

  18. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  19. The maintenance and the data bank of Spanish NNPP (DACNE SYSTEM)

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    1995-01-01

    New projects and activities appear at Nuclear Industry with the purpose of improving availability and safety of the plants, i.e. Probabilistic Safety Assessment (PSA), maintenance optimization programs or life extension programs. A common characteristic of these projects is that they need collect data from different sources. A multipurpose information system, as Spanish DACNE System, can be useful. Some applicabilities are presented in maintenance area. (Author)

  20. Maintenance therapy in advanced non-small cell lung cancer: current status and future implications.

    Science.gov (United States)

    Stinchcombe, Thomas E; Socinski, Mark A

    2011-01-01

    Maintenance therapy for patients with advanced non-small cell lung cancer has been an area of intense investigation. Maintenance therapy has been divided into two broad categories: continuation maintenance when the chemotherapy or targeted agent was part of a defined number of cycles of combination therapy and in the absence of disease progression is continued as a single agent or switch maintenance when a third agent is initiated after four cycles of platinum-based double-agent chemotherapy in the absence of disease progression. Two monoclonal antibodies, cetuximab and bevacizumab, are used as continuation maintenance, but the incremental benefit of the maintenance therapy with these agents is undetermined. Phase III trials have not revealed an overall survival benefit for continuation maintenance chemotherapy, and this approach should be considered investigational. Phase III trials have demonstrated an improvement in overall survival with switch maintenance therapy with pemetrexed compared with placebo in patients with nonsquamous histology and erlotinib compared with placebo. Phase III trials have not revealed an improvement in quality of life with maintenance therapy. In the trials of maintenance therapy, 30 to 40% of patients enrolled in the observation or placebo arm did not receive second-line therapy, and among the patients who did receive second-line therapy, there was significant heterogeneity in the therapy. The development of maintenance therapy has raised issues about the role of treatment-free intervals in routine clinical care, trial design issues such as the optimal endpoint, the ethics of a placebo arm, and the implications of maintenance therapy for first-line trials.

  1. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  2. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  3. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  4. Bragg projection ptychography on niobium phase domains

    Science.gov (United States)

    Burdet, Nicolas; Shi, Xiaowen; Clark, Jesse N.; Huang, Xiaojing; Harder, Ross; Robinson, Ian

    2017-07-01

    Bragg projection ptychography (BPP) is a coherent x-ray diffraction imaging technique which combines the strengths of scanning microscopy with the phase contrast of x-ray ptychography. Here we apply it for high resolution imaging of the phase-shifted crystalline domains associated with epitaxial growth. The advantages of BPP are that the spatial extent of the sample is arbitrary, it is nondestructive, and it gives potentially diffraction limited spatial resolution. Here we demonstrate the application of BPP for revealing the domain structure caused by epitaxial misfit in a nanostructured metallic thin film. Experimental coherent diffraction data were collected from a niobium thin film, epitaxially grown on a sapphire substrate as the beam was scanned across the sample. The data were analyzed by BPP using a carefully selected combination of refinement procedures. The resulting image shows a close packed array of epitaxial domains, shifted with respect to each other due to misfit between the film and its substrate.

  5. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    Science.gov (United States)

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the

  6. 48 CFR 301.606-73 - Requirements for continuous learning maintenance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements for continuous learning maintenance. 301.606-73 Section 301.606-73 Federal Acquisition Regulations System HEALTH..., and Responsibilities 301.606-73 Requirements for continuous learning maintenance. Designated Project...

  7. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  8. The modification of main steam safety valves in Qinshan phase Ⅱ expansion project

    International Nuclear Information System (INIS)

    Chen Haiqiao

    2012-01-01

    The main steam safety valves of NPP steam system are second- class nuclear safety component. It used to limit the pressure of SG secondary side and main steam system via emitting steam into the environment. At present, the main steam safety valves have mechanical valves and assisted power valves. According to the experience of power plants at home and abroad, including Qinshan Phase Ⅱ unit 1/2 experience feedback, Qinshan Phase Ⅱ expansion project made modification on valve type, setting value and valve body. This paper introduce the characteristics of different safety valve types, the modification of main steam safety valves and the modification analysis on safety issues.security and impact on the other systems in Qinshan Phase Ⅱ expansion project. (author)

  9. Molten salt steam generator subsystem research experiment. Volume I. Phase 1 - Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-10-01

    A study was conducted for Phase 1 of a two-phase project whose objectives were to develop a reliable, cost-effective molten salt steam generating subsystem for solar thermal plants, minimize uncertainty in capital, operating, and maintenance costs, and demonstrate the ability of molten salt to generate high-pressure, high-temperature steam. The Phase 1 study involved the conceptual design of molten salt steam generating subsystems for a nominal 100-MWe net stand-alone solar central receiver electric generating plant, and a nominal 100-MWe net hybrid fossil-fueled electric power generating plant that is 50% repowered by a solar central receiver system. As part of Phase 1, a proposal was prepared for Phase 2, which involves the design, construction, testing and evaluation of a Subsystem Research Experiment of sufficient size to ensure successful operation of the full-size subsystem designed in Phase 1. Evaluation of several concepts resulted in the selection of a four-component (preheater, evaporator, superheater, reheater), natural circulation, vertically oriented, shell and tube (straight) heat exchanger arrangement. Thermal hydraulic analysis of the system included full and part load performance, circulation requirements, stability, and critical heat flux analysis. Flow-induced tube vibration, tube buckling, fatigue evaluation of tubesheet junctions, steady-state tubesheet analysis, and a simplified transient analysis were included in the structural analysis of the system. Operating modes and system dynamic response to load changes were identified. Auxiliary equipment, fabrication, erection, and maintenance requirements were also defined. Installed capital costs and a project schedule were prepared for each design.

  10. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Conde, H. [Uppsala Univ. (Sweden). Dept. of Neutron Research; Gudowski, W. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Reactor and Neutron Physics; Liljenzin, J.O. [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Nuclear Chemistry; Mileikovsky, C. [Pully (Switzerland)

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to `border countries` which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  11. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    International Nuclear Information System (INIS)

    Conde, H.

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to 'border countries' which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  12. Predictive Maintenance (PdM) Centralization for Significant Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Dale

    2010-09-15

    Cost effective predictive maintenance (PdM) technologies and basic energy calculations can mine energy savings form processes or maintenance activities. Centralizing and packaging this information correctly empowers facility maintenance and reliability professionals to build financial justification and support for strategies and personnel to weather global economic downturns and competition. Attendees will learn how to: Systematically build a 'pilot project' for applying PdM and tracking systems; Break down a typical electrical bill to calculate energy savings; Use return on investment (ROI) calculations to identify the best and highest value options, strategies and tips for substantiating your energy reduction maintenance strategies.

  13. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  14. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  15. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    DUNCAN, G.P.

    1999-01-01

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  16. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  17. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  18. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  19. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  20. Analyses in Support of Risk-Informed Natural Gas Vehicle Maintenance Facility Codes and Standards: Phase II.

    Energy Technology Data Exchange (ETDEWEB)

    Blaylock, Myra L.; LaFleur, Chris Bensdotter; Muna, Alice Baca; Ehrhart, Brian David

    2018-03-01

    Safety standards development for maintenance facilities of liquid and compressed natural gas fueled vehicles is required to ensure proper facility design and operating procedures. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase II work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest using risk ranking. Detailed simulations and modeling were performed to estimate the location and behavior of natural gas releases based on these scenarios. Specific code conflicts were identified, and ineffective code requirements were highlighted and resolutions proposed. These include ventilation rate basis on area or volume, as well as a ceiling offset which seems ineffective at protecting against flammable gas concentrations. ACKNOWLEDGEMENTS The authors gratefully acknowledge Bill Houf (SNL -- Retired) for his assistance with the set-up and post-processing of the numerical simulations. The authors also acknowledge Doug Horne (retired) for his helpful discussions. We would also like to acknowledge the support from the Clean Cities program of DOE's Vehicle Technology Office.

  1. Flexible maintenance system (FMS). Background, concept, and results of technical development

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Watanabe, Osami; Takizawa, Yoji; Ohga, Yukiharu; Ohi, Tadashi

    2006-01-01

    Maintenance works of nuclear power plants have been involved with various people and organizations. Thus human errors are apt to be made. Since 2000, the project on development of flexible maintenance system (FMS) has been conducted for five years in order to make maintenance works more rational and reduce human errors probability. Background, concept and results of technical development to upgrade maintenance works and training are reviewed. Advanced technology such as optical viewing equipments, laser holography inspection systems and neural networks shall be applied to maintenance works. (T. Tanaka)

  2. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  3. Horonobe Underground Research Laboratory Project. Plans for surface-based investigations. Phase 1

    International Nuclear Information System (INIS)

    Goto, Junichi; Hama, Katsuhiro

    2003-10-01

    The Horonobe Underground Research Laboratory Project is an investigation project which is planned over 20 years. The investigations are conducted in the three phases: investigations from surface (Phase 1), investigations during construction of the underground facility (Phase 2) and investigations using the facility (Phase 3). Taking into account the results from 'H12: Project of Establish the Scientific and Technical Basis for HLW Disposal in Japan - Second Progress Report on Research and Development for the Geological Disposal of HLW in Japan-' (JNC, 2000), research and development goals for the Horonobe URL project were re-defined as follows; a) Development of investigation technologies for the geological environment, b) Development of monitoring technologies for the geological environment, c) Study on the long-term stability of the geological environment, d) Development of the basis for engineering technologies in deep underground, e) Verification of technologies for engineered barriers, f) Development of detailed designing technologies of the repositories, and g) Improvement of safety assessment methodologies. Investigations for the goals a) to d) and e) to g) are conducted in the 'Geoscientific Research' and 'Research and Development on Geological Disposal', respectively. In Phase 1, a 'laboratory construction area' of a few kilometers square is selected based on the results from early stage investigations. Subsequent investigations are concentrated in the selected area and its periphery. Acquisition of data by surface-based investigations, modeling of the geological environment and predictions of changes in the geological environment caused by the construction of the underground facility, are conducted in a) Development of investigation technologies for the geological environment. Development and installation of monitoring equipments and data acquisition prior to the construction of the underground facility fall under b) Development of monitoring technologies

  4. Reliability considerations of NDT by probability of detection (POD). Determination using ultrasound phased array. Results from a project in frame of the German nuclear safety research program

    International Nuclear Information System (INIS)

    Kurz, Jochen H.; Dugan, Sandra; Juengert, Anne

    2013-01-01

    Reliable assessment procedures are an important aspect of maintenance concepts. Non-destructive testing (NDT) methods are an essential part of a variety of maintenance plans. Fracture mechanical assessments require knowledge of flaw dimensions, loads and material parameters. NDT methods are able to acquire information on all of these areas. However, it has to be considered that the level of detail information depends on the case investigated and therefore on the applicable methods. Reliability aspects of NDT methods are of importance if quantitative information is required. Different design concepts e.g. the damage tolerance approach in aerospace already include reliability criteria of NDT methods applied in maintenance plans. NDT is also an essential part during construction and maintenance of nuclear power plants. In Germany, type and extent of inspection are specified in Safety Standards of the Nuclear Safety Standards Commission (KTA). Only certified inspections are allowed in the nuclear industry. The qualification of NDT is carried out in form of performance demonstrations of the inspection teams and the equipment, witnessed by an authorized inspector. The results of these tests are mainly statements regarding the detection capabilities of certain artificial flaws. In other countries, e.g. the U.S., additional blind tests on test blocks with hidden and unknown flaws may be required, in which a certain percentage of these flaws has to be detected. The knowledge of the probability of detection (POD) curves of specific flaws in specific testing conditions is often not present. This paper shows the results of a research project designed for POD determination of ultrasound phased array inspections of real and artificial cracks. The continuative objective of this project was to generate quantitative POD results. The distribution of the crack sizes of the specimens and the inspection planning is discussed, and results of the ultrasound inspections are presented. In

  5. The radiation protection and its maintenance

    International Nuclear Information System (INIS)

    Brachet, Y.; Mauclert, J.L.

    2003-01-01

    This presentation exposes the different phases of the management of an operation taking into account the dosimetry; Each phase is important; the methodology and the analysis are important. The solutions have to be pragmatic and they depend on the context. Relative to the maintenance and dismantling operations for the oldest of nuclear facilities the existence of a data base is necessary to improve the working conditions of the operators. (N.C.)

  6. Tokamak Fusion Core Experiment maintenance study

    International Nuclear Information System (INIS)

    Snyder, A.M.; Watts, K.D.

    1985-01-01

    The recently completed Tokamak Fusion Core Experiment (TFCX) design project was carried out to investigate potential next generation tokamak concepts. An important aspect of this project was the early development and incorporation of remote maintainability throughout the design process. This early coordination and incorporation of maintenance aspects to the design of the device and facilities would assure that the machine could ultimately be maintained and repaired in an efficient and cost effective manner. To meet this end, a rigorously formatted engineering trade study was performed to determine the preferred configuration for the TFCX reactor based primarily on maintenance requirements. The study indicated that the preferred design was one with an external vacuum vessel and torrodial field coils that could be removed via a simple radial motion. The trade study is presented and the preferred TFCX configuration is described

  7. Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate , part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  8. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  9. Weight Loss Maintenance in African American Women: A Systematic Review of the Behavioral Lifestyle Intervention Literature

    Directory of Open Access Journals (Sweden)

    Lisa M. Tussing-Humphreys

    2013-01-01

    Full Text Available We performed a systematic review of the behavioral lifestyle intervention trials conducted in the United States published between 1990 and 2011 that included a maintenance phase of at least six months, to identify intervention features that promote weight loss maintenance in African American women. Seventeen studies met the inclusion criteria. Generally, African American women lost less weight during the intensive weight loss phase and maintained a lower % of their weight loss compared to Caucasian women. The majority of studies failed to describe the specific strategies used in the delivery of the maintenance intervention, adherence to those strategies, and did not incorporate a maintenance phase process evaluation making it difficult to identify intervention characteristics associated with better weight loss maintenance. However, the inclusion of cultural adaptations, particularly in studies with a mixed ethnicity/race sample, resulted in less % weight regain for African American women. Studies with a formal maintenance intervention and weight management as the primary intervention focus reported more positive weight maintenance outcomes for African American women. Nonetheless, our results present both the difficulty in weight loss and maintenance experienced by African American women in behavioral lifestyle interventions.

  10. An Approach to Integrating Tactical Decision-Making in Industrial Maintenance Balance Scorecards Using Principal Components Analysis and Machine Learning

    Directory of Open Access Journals (Sweden)

    Néstor Rodríguez-Padial

    2017-01-01

    Full Text Available The uncertainty of demand has led production systems to become increasingly complex; this can affect the availability of the machines and thus their maintenance. Therefore, it is necessary to adequately manage the information that facilitates decision-making. This paper presents a system for making decisions related to the design of customized maintenance plans in a production plant. This paper addresses this tactical goal and aims to provide greater knowledge and better predictions by projecting reliable behavior in the medium-term, integrating this new functionality into classic Balance Scorecards, and making it possible to extend their current measuring function to a new aptitude: predicting evolution based on historical data. In the proposed Custom Balance Scorecard design, an exploratory data phase is integrated with another analysis and prediction phase using Principal Component Analysis algorithms and Machine Learning that uses Artificial Neural Network algorithms. This new extension allows better control over the maintenance function of an industrial plant in the medium-term with a yearly horizon taken over monthly intervals which allows the measurement of the indicators of strategic productive areas and the discovery of hidden behavior patterns in work orders. In addition, this extension enables the prediction of indicator outcomes such as overall equipment efficiency and mean time to failure.

  11. The maintenance optimization of structural components in nuclear power plants

    International Nuclear Information System (INIS)

    Bryla, P.; Ardorino, F.; Aufort, P.; Jacquot, J.P.; Magne, L.; Pitner, P.; Verite, B.; Villain, B.; Monnier, B.

    1997-10-01

    An optimization process, called 'OMF-Structures', is developed by Electricite de France (EDF) in order to extend the current 'OMF' Reliability Centered Maintenance to piping structural components. The Auxiliary Feedwater System of a 900 MW French nuclear plant has been studied in order to lay the foundations of the method. This paper presents the currently proposed principles of the process. The principles of the OMF-Structures process include 'Risk-Based Inspection' concepts within an RCM process. Two main phases are identified: The purpose of the first phase is to select the risk-significant failure modes and associated elements. This phase consists of two major steps: potential consequences evaluation and reliability performance evaluation. The second phase consists of the definition of preventive maintenance programs for piping elements that are associated with risk-significant failure modes. (author)

  12. Tofacitinib as Induction and Maintenance Therapy for Ulcerative Colitis

    NARCIS (Netherlands)

    Sandborn, William J.; Su, Chinyu; Sands, Bruce E.; D'Haens, Geert R.; Vermeire, Séverine; Schreiber, Stefan; Danese, Silvio; Feagan, Brian G.; Reinisch, Walter; Niezychowski, Wojciech; Friedman, Gary; Lawendy, Nervin; Yu, Dahong; Woodworth, Deborah; Mukherjee, Arnab; Zhang, Haiying; Healey, Paul; Panés, Julian

    2017-01-01

    Tofacitinib, an oral, small-molecule Janus kinase inhibitor, was shown to have potential efficacy as induction therapy for ulcerative colitis in a phase 2 trial. We further evaluated the efficacy of tofacitinib as induction and maintenance therapy. We conducted three phase 3, randomized,

  13. Mobile devices applied in the maintenance; Dispositivos moveis aplicados na manutencao

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Robison Tirre; Monteiro, Claudio Rogerio; Oliveira, Hudson Texeira de; Pacheco, Rogerio da Silva; Milrad, Shlomo [Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    In natural gas pipeline companies, like TBG (Transportadora Brasileira Gasoduto Bolivia Brasil S.A.), with large extensions of pipes and installations distributed so far from each other it is usual that maintenance personnel go to the field job and sometimes do not come back to the office at the same day. In addition, the need to access the corporate network to input maintenance data in the Maintenance Module of Enterprise Resource Planning means that maintenance registries are something that do not flow easily from field to database. Technicians also spend a lot of time in front of the computer decreasing their productive working hours. Being aware of the importance of data to a consistent integrity pipeline program and to solve the problems related above, TBG implemented Maintenance in the Palm of the Hand project and distributed hand held PCs to all technicians, with software that works like an electronic maintenance work order. This system permits to collect maintenance data in real time and also providing important information to help technicians perform their jobs. If necessary, they can start a maintenance request. At any moment it is possible to connect to the corporate network and download data to CMMS. This project allowed TBG to increase quality and reliability of maintenance data and speed of information flow from field to CMMS, eliminating the need to print work orders and data sheets, increasing the productivity of technicians and reducing the time spent on boring tasks such as taking notes. (author)

  14. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  15. Bavarian liquid hydrogen bus demonstration project - safety, licensing and acceptability aspects

    Energy Technology Data Exchange (ETDEWEB)

    Wurster, R.; Knorr, H.; Pruemm, W.

    1999-07-01

    A regular 12 m city bus of the MAN SL 202 type with an internal combustion engine adapted to hydrogen operation and auxiliary gasoline operation was demonstrated in the Bavarian cities of Erlangen and Munich between April 1996 and August 1998. Three bus operators, Erlanger Stadtwerke, Stadtwerke Muenchen and Autobus Oberbayern were testing the bus in three different operating schemes. In order to be able to perform this worldwide first public demonstration of a liquid hydrogen (LH{sub 2}) city bus in regular service, several requirements with respect to safety, licensing, training and acceptability had to be fulfilled. These activities were focusing mainly on the hydrogen specific issues such as (a) integration of onboard LH{sub 2} storage vessels, piping and instrumentation, (b) implementation of storage and refueling infrastructure in the operators' yards, (c) adaptation of the maintenance garages, (d) training of operating and maintenance personnel. During phase II of the demonstration activity a poll was performed on passengers traveling onboard the hydrogen-powered city bus in order to determined the level of acceptance among the users of the bus. The bus was designed and manufactured by MAN Nutzfahrzeuge Aktiengesellschaft. The cryogenic fuel storage and the refueling equipment were designed and manufactured by Linde AG. The realization of the hardware was financially supported by the European Commission (EC) within the Euro-Quebec Hydro-Hydrogen Pilot Project. The demonstration phase was financially supported by EC and the Bavarian State Government. Ludwig-Boelkow-Systemtechnik performed project monitoring for both funding organizations. The presentation will summarize the most important results of this demonstration phase and will address the measures undertaken in order to get the bus, the refueling infrastructure and the maintenance and operating procedures approved by the relevant authorities.

  16. Human factors interventions to reduce human errors and improve productivity in maintenance tasks

    International Nuclear Information System (INIS)

    Isoda, Hachiro; Yasutake, J.Y.

    1992-01-01

    This paper describes work in progress to develop interventions to reduce human errors and increase maintenance productivity in nuclear power plants. The effort is part of a two-phased Human Factors research program being conducted jointly by the Central Research Institute of Electric Power Industry (CRIEPI) in Japan and the Electric Power Research Institute (EPRI) in the United States. The overall objective of this joint research program is to identify critical maintenance tasks and to develop, implement and evaluate interventions which have high potential for reducing human errors or increasing maintenance productivity. As a result of the Phase 1 effort, ten critical maintenance tasks were identified. For these tasks, over 25 candidate interventions were identified for potential development. After careful analysis, seven interventions were selected for development during Phase 2. This paper describes the methodology used to analyze and identify the most critical tasks, the process of identifying and developing selected interventions and some of the initial results. (author)

  17. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  18. Monitoring plan and maintenance NPP the Vandellos I and future prospects

    International Nuclear Information System (INIS)

    Margalef Escoda, S.

    2013-01-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  19. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  20. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  1. Phase 2 : evaluation of the national crash experience : comparison of CARDfile national motor vehicle accident projections with projections from other data bases

    Science.gov (United States)

    1997-01-01

    The purpose of this Phase 2 Study is to compare national motor vehicle accident projections : made from the Crash Avoidance Research Data base (CARDfile) with national motor : vehicle accident projections made from other data bases. For the most part...

  2. The Qinshan phase III project-a successful model of sino-canadian cooperation

    International Nuclear Information System (INIS)

    Pang, S.H.H.; Alikhan, S.; Gu Jun

    2005-01-01

    The Qinshan Phase III (CANDU) Project, the largest-scale cooperative project between China and Canada, was completed in 2003 well in advance of the schedule and 10% under budget. The Third Qinshan (Phase III) Nuclear Power Plant (TQNPP) was built in record times: Unit 1 achieved commercial operation on December 31, 2002 and Unit 2 on July 20, 2003, 43 days and 115 days ahead of schedule respectively. Improvements in design and construction methods allowed Unit 1 to be constructed in 51.5 months from First Concrete to Criticality - a record in China for nuclear power plants. The key factors are project management and project management tools, quality assurance, construction methods, electronic documentation with configuration control that provides up-to-date on-line information, CADDS design linked with material management and control. New design and construction techniques were introduced by combining conventional AECL practices with working experiences in China. The most advanced tools and techniques for achieving optimum construction quality, schedule and cost were used. Successful application of advanced project management methods and tools has benefited TQNPC in its subsequent plant operation, and the Chinese contractors in advancing their capabilities in future nuclear projects in China as well as enhancing their opportunities internationally. Excellent co-operation and teamwork within the integrated TQNPC/AECL Commissioning Team with well documented QA program, process and procedures also contributed to the remarkable success of the Project. AECL's initial assessment, based on lessons learned, showed that the project schedule could readily be reduced to 66 months and the capital costs reduced by 25% for a replication project. AECL is building on this experience and successful results of TQNPP in its Advanced CANDU Reactor TM (ACR TM ) ** design. (authors)

  3. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

    2009-09-09

    Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

  4. BPX commitment to total remote maintenance

    International Nuclear Information System (INIS)

    Davis, F.C.; Burgess, T.W.

    1991-01-01

    The Burning Plasma Experiment (BPX), to be located at Princeton Plasma Physics Laboratory, is the next major experimental machine in the US Fusion Program. It will be fueled with deuterium-tritium (D-T) that, when burned, will generate high-energy neutrons. This will activate the various materials used in construction of the machine, which will result in high levels of gamma radiation. Any subsequent maintenance activities on the machine or in the test cell area must be performed remotely. The initial criteria for BPX assumed that failure of toroidal field (TF) coil or poloidal field (PF) coil was an unlikely event. Therefore, no provisions were made for remote replacement. Expected failures were limited to the plasma-facing components and the external auxiliary equipment such as heating systems and diagnostics. Recent coil failures experienced at the Tokamak Fusion Test Reactor (TFTR), the Joint European Torus (JET), JT-60, and Tore Supra caused the BPX project staff to reconsider the need for remote replacement. A study was undertaken to investigate how the project would be affected if the capability to recover from a coil failure were required. Potential effects including configuration changes to the machine and facility, project cost, and project operation were considered. The study revealed that it is indeed feasible to design BPX for remote recovery from any coil failure. However, for this to be accomplished effectively, it is imperative to incorporate the necessary remote maintenance features of the components to be remotely replaced into the original design along with all of the other functional features. The remote maintenance capability cannot be retrofitted after the design is complete or the equipment is built. This paper discusses the impacts of the coil remote replacement study and the subsequent changes to the design. 4 figs., 1 tab

  5. Integrated sign management system : ADOT maintenance group

    Science.gov (United States)

    2003-12-01

    The Arizona Department of Transportation (ADOT) maintains and manages an inventory of roadway signs. Before the implementation of this project, sign technicians maintained inventory records on individual laptops to track their daily sign maintenance ...

  6. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  7. Residual sleep disturbance and risk of relapse during the continuation/maintenance phase treatment of major depressive disorder with the selective serotonin reuptake inhibitor fluoxetine

    Directory of Open Access Journals (Sweden)

    McGrath Patrick J

    2010-02-01

    Full Text Available Abstract Background Relapse of major depressive disorder (MDD is a common clinical problem. This study was designed to determine whether residual sleep disturbance (insomnia and hypersomnia predict risk of relapse during the continuation and maintenance treatment of MDD. Methods A total of 570 patients with MDD were treated with open-label, flexible dose fluoxetine (range 20 to 60 mg; mean dose = 45.8 mg/day; SD = 15.1 for 12 weeks. Under double blind conditions, 262 patients who achieved clinical response were randomly assigned to continue fluoxetine or to switch to placebo for 52 weeks or until relapse. Residual sleep disturbance during the baseline visit of the double-blind phase was assessed using items 4, 5, 6 (insomnia and 22, 23, 24 (hypersomnia of the Hamilton Depression Rating Scale (HDRS. Survival analysis was utilized to determine the effect of residual sleep disturbance on risk of relapse. Results The severities of early (P > 0.05, middle (P > 0.05, late (P > 0.05, or total (P > 0.05 residual insomnia were not found to significantly predict risk of relapse during continuation and maintenance-phase treatment. Similarly, the severities of early bedtime (P > 0.05, oversleeping (P > 0.05, napping (P > 0.05, or total (P > 0.05 residual hypersomnia were not found to significantly predict risk of relapse during continuation and maintenance-phase treatment. Conclusion The present study did not identify the severity of residual sleep disturbance among fluoxetine responders to predict risk of MDD relapse. The size of our sample may have precluded us from identifying more modest effects of residual sleep disturbance on the risk of relapse in MDD patients. Future studies are needed to further explore the relationship between residual sleep disturbance and relapse in MDD. Trial Registration ClinicalTrials.gov Identifier: NCT00427128

  8. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  9. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  10. The ITER Remote Maintenance Management System

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Rolfe, A.C.

    2009-01-01

    A major challenge for the ITER project is to develop and implement a Remote Maintenance System, which can deliver high Tokamak availability within the constraints of the overall ITER programme objectives. Much of the maintenance of ITER will be performed using remote handling methods and some with combined manual and remote activities working together. The organization and management of the ITER remote handling facilities will be of a scale unlike any other remote handling application in the world. The ITER remote handling design and procurement activities will require co-ordination and management across many different sites throughout the world. It will be a major challenge for the ITER project to ensure a consistent quality and technical approach in all of the contributing parties. To address this issue the IO remote handling team are implementing the ITER Maintenance Management Plan (IMMP) comprising an overarching document defining the policies and methodologies (ITER Remote Maintenance Management System or IMMS) and an associated ITER remote handling code of practise (IRHCOP). The IMMS will be in document form available as a pdf file or similar. The IRHCOP will be implemented as a web based application and will provide access to the central resource of the entire code of practise from any location in the world. The IRHCOP data library will be centrally controlled in order that users can be assured of the data relevance and authenticity. This paper will describe the overall approach being taken to deal with this challenge and go on to detail the structure and content of both the IMMS and the IRHCOP.

  11. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  12. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  13. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Gotcheva, N.; Macchi, L.; Oedewald, P.; Eitrheim, M.H.R.; Axelsson, C.; Reiman, T.; Pietikaeinen, E.

    2013-04-01

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  14. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Gotcheva, N.; Macchi, L.; Oedewald, P. [Technical Research Centre of Finland (VTT), Espoo (Finland); Eitrheim, M.H.R. [Institute for Energy Technology (IFE) (Norway); Axelsson, C.; Reiman, T.; Pietikaeinen, E. [Ringhals AB (NPP), Vattenfall AB (Sweden)

    2013-04-15

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  15. Monitoring and evaluation of Blyth Offshore Wind Farm. Projected operation and maintenance costs of UK offshore wind farms based on the experience at Blyth

    Energy Technology Data Exchange (ETDEWEB)

    Greig, E.

    2004-07-01

    This is the fifth of seven reports in this series on specific aspects of the monitoring and evaluation of the Blyth offshore wind farm project. The report assesses the operation and maintenance (O and M) costs for the wind farm in its first full year of operation, and extrapolates these costs to give indicative costs for larger projects. It identifies both planned regular costs and unplanned site maintenance costs; some costs can be attributed to 'troubleshooting' during installation and would not be expected in future years. The Blyth wind farm, the first in the UK, consists of two 2 MW wind turbines installed approximately 1 km from the coast in water about 6 m deep at low tide. The site is exposed to the full impact of the North Sea weather, breaking waves and a significant tidal range (about 5 m). Location, boat availability, weather and insurance are identified as the key factors affecting O and M costs for future offshore wind farms in the UK.

  16. New Models for Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.

    component that was causing a large amount of downtime were identified. Further analysis with the Reliability-Centred Maintenance concept helped determine the most appropriate maintenance strategy. In the final perspective, long-term strategic decisions were the focus. Asset Management and especially Asset...... Life-Cycle Management were studied using a case study. The case study analysis was used to generate strategies to help managers perform maintenance more proactively and to prepare the management of the offshore wind farm turbines for the future. Existing literature on Asset Life-Cycle Management has......Operations and maintenance (O&M) processes are important for keeping offshore wind turbines in operation. Costs related to such activities constitute approximately 30% of the lifetime cost of an offshore wind farm project. Currently, the offshore wind energy industry has shown a rapid increase...

  17. Homogenization of independent inspection criteria of Quality Assurance in the maintenance activities

    International Nuclear Information System (INIS)

    Gomez Cardinanos, R.

    2012-01-01

    Among the official documents governing the operation of Spanish nuclear power plants is the Quality Manual and Quality Assurance. This manual gives a formal answer to the requirements of the regulations and the Nuclear Safety Council. To monitor the compliance of its requirements, the plants are controlled by independent organizations. Since 2007, in nuclear Sta. Maria de Garona is developed a project to improve the performance of the QA inspectors during maintenance activities. Results of the project have been edited data sheets on specific activities of maintenance. The project aims to incorporate sheets that help QA inspectors in their daily inspection.

  18. Development of reliability centered maintenance methods and tools

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Dubreuil-Chambardel, A.; Lannoy, A.; Monnier, B.

    1992-12-01

    This paper recalls the development of the RCM (Reliability Centered Maintenance) approach in the nuclear industry and describes the trial study implemented by EDF in the context of the OMF (RCM) Project. The approach developed is currently being applied to about thirty systems (Industrial Project). On a parallel, R and D efforts are being maintained to improve the selectivity of the analysis methods. These methods use Probabilistic Safety Study models, thereby guaranteeing better selectivity in the identification of safety critical elements and enhancing consistency between Maintenance and Safety studies. They also offer more detailed analysis of operation feedback, invoking for example Bayes' methods combining expert judgement and feedback data. Finally, they propose a functional and material representation of the plant. This dual representation describes both the functions assured by maintenance provisions and the material elements required for their implementation. In the final chapter, the targets of the future OMF workstation are summarized and the latter's insertion in the EDF information system is briefly described. (authors). 5 figs., 2 tabs., 7 refs

  19. Development of a methodology for maintenance optimization at Kozloduy NPP

    International Nuclear Information System (INIS)

    Kitchev, E.

    1997-01-01

    The paper presents the overview of a project for development of an applicable strategy and methods for Kozloduy NPP (KNPP) to optimize its maintenance program in order to meet the current risk based maintenance requirements. The strategy in a format of Integrated Maintenance Program (IMP) manual will define the targets of the optimization process, the major stages and elements of this process and their relationships. IMP embodies the aspects of the US NRC Maintenance Rule compliance and facilitates the integration of KNPP programs and processes which impact the plant maintenance and safety. The methods in a format of IMP Instructions (IM-PI) will define how the different IMP stages can be implemented and the IMP targets can be achieved at KNPP environment. (author). 8 refs

  20. {open_quotes}O{close_quotes} ring sealed process tube, Phase II, test project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.E.

    1951-04-09

    The {open_quotes}O{close_quotes} ring seal has been proposed to replace the van stone flange and the bellows thermal expansion assembly currently used on the existing Hanford piles to achieve water and gas seals, respectively. Possible advantages of the {open_quotes}O{close_quotes} ring seal are: (1) simplification of component parts and elimination of van stone corrosion; (2) simplification of maintenance; (3) lower costs of initial erection; (4) increased strength. This test supplements Test Project No. 27 (a preliminary thermal cycling test) in applying the {open_quotes}O{close_quotes} ring seal assembly to actual pile operating conditions.

  1. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  2. The U.S. Federal Highway Administration winter Maintenance Decision Support System (MDSS) project

    Energy Technology Data Exchange (ETDEWEB)

    Pisano, P.A. [Federal Highway Administration, Road Weather Managment Program, Washington, D.C. (United States); Stern, A.D. [Mitretek Systems, Inc., Oceanic, Atmospheric and Space Systems, Falls Church, VA (United States); Mahoney, W.P. [National Center for Atmospheric Research, Research Applications Program, Boulder, CO (United States)

    2004-07-01

    Managing a winter maintenance program today is an increasingly complex endeavor. Just making sure that a plow blade is at the ready when the first flake falls is only a small part of the task. With tight budgets and the high expectation of the public for keeping roads clear of snow and ice, today's maintenance manager has to be able to handle multiple tasks or risk getting behind the onslaught of winter weather. Good information leads to effective practices, however all of the regulations concerning chemical applications, environmental impacts and multiple, often contradictory weather forecasts can lead to information overload. The United States Department of Transportation (DOT), Federal Highway Administration (FHWA) recognized this potential problem in the late 1990's as part of its Road Weather Management (RWM) program. Generally speaking, there were plenty of weather forecasts, along with a few companies that issued road-specific forecasts, but there was a lack of linkage between the information available and the decisions made by winter maintenance managers. It was this weak link that became the genesis for the winter Maintenance Decision Support System (MDSS). The MDSS has since matured into a functional prototype. During the winter of 2002-2003, the prototype was deployed at several maintenance garages in central Iowa for a field demonstration. This paper will document the implementation of the demonstration, a summary of lessons learned, and technology transfer activities. It will also describe plans for a longer, more comprehensive demonstration during the winter of 2003-2004. (orig.)

  3. Alternatives to lithium and divalproex in the maintenance treatment of bipolar disorder.

    Science.gov (United States)

    Gnanadesikan, Mukund; Freeman, Marlene P; Gelenberg, Alan J

    2003-06-01

    The role of lithium carbonate in the maintenance treatment of bipolar disorder is well established. Unfortunately, many patients fail to respond adequately to this agent or are unable to tolerate its adverse effects. Divalproex has become a commonly used alternative to lithium, but it also is ineffective or poorly tolerated in many patients. This article attempts to review the available data on maintenance therapy in bipolar disorder with a variety of anticonvulsants and antipsychotics (both conventional and novel), with reference to relevant studies in acute mania and bipolar depression as well. Evidence on maintenance therapy and relevant acute-phase data were collected using MEDLINE database searches. Data on maintenance therapy with agents other than lithium and divalproex are sparse, and often derived from open, uncontrolled studies. Implications and flaws of available data are discussed. Other than lithium, there are few robust double-blind data to support the use of a variety of agents in the maintenance phase. However, uncontrolled data suggest that a number of agents merit further study.

  4. TWRS phase 1 infrastructure project (W-519) characterization

    International Nuclear Information System (INIS)

    Mitchell, C.J.

    1998-01-01

    In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a 'demonstration' site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity

  5. Application of isotopes and radiation to increasing agricultural production - Phase 2. Indonesia. Project findings and recommendations

    International Nuclear Information System (INIS)

    1992-01-01

    This Phase 2 Project was primarily aimed at consolidating the advances made during the previous phase, formulating practical agricultural technologies which can be adopted by farmers, disseminating and applying these technologies, and enhancing the capability of the Centre for Application of Isotopes and Radiation (CAIR) to conduct agricultural research using nuclear and related techniques. Outputs generated by this project were generally in accordance with those anticipated in the Project Document. Some outputs have been transferred to the target beneficiaries (farmers) through existing systems of extension, in co-operation with the main implementing agency (BATAN). Other outputs have potential for further assessment, and may lead to practical applications in future. The rest remain as important contributions to scientific knowledge. The project has been managed to assure sustainability after project termination. A strong indication of such sustainability is evident in the on-going research and development work at CAIR and the adoption of transferred technologies by the end-users. To keep up with rapid global advancements in bio-science and technology, a new project on application of nuclear and related techniques in agricultural bio-science and technology would be needed in relation to the second long-term phase of the national development programmes. (author)

  6. Investment feasibility tracking: the importance of measuring and tracking the success level of the project during commercialization phase

    Science.gov (United States)

    Saputra, Y. A.; Setyaningtyas, V. E. D.; Latiffianti, E.; Wijaya, S. H.; Ladamay, O. S. A.

    2018-04-01

    Measuring project success level is a challenging activity. This area of works has attracted many researchers to look deeper into the method of measurement, success factor identification, risk management, and many others relevant topics. However, the project management scope is limited until the project handover stage. After a project handover, the control of a project management changes from Project Management Team to the project owner/commercialization team. From an investor’s point of view, the success of a project delivery needs to be followed by the success of commercialization phase. This paper aims to present an approach on how we track and measure the progress and success level of a project investment in the commercialization phase. This is an interesting topic which probably often being forgotten in many practical case. Our proposed concept modify Freeman and Beale concept by estimating the variance between the Planned Net Present Value / Annual Worth (as it is in the Feasibility Study Document) and the Actual Net Present Value / Annual Worth (until the point time of evaluation). The gap will lead us to the next analysis and give us some important information, especially exposing whether our project investment performs better than the planning or underperformed. Some corrective actions can be suggested based on the provided information. Practical cases to exercise the concept is also provided and discussed; one case in a property sector in the middle of commercialization phase, and another case in a Power Plant investment approaching the end of commercialization phase.

  7. 76 FR 55947 - Industrial Relations Promotion Project, Phase II in Vietnam

    Science.gov (United States)

    2011-09-09

    ... DEPARTMENT OF LABOR Office of the Secretary Industrial Relations Promotion Project, Phase II in... to perform the type of activity to be funded.. DAI, through its Industrial Relations Promotion... provided a letter in support of continued funding of DAI/IRRP based, on part, on the importance of the...

  8. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  9. Clinical trial: factors associated with freedom from relapse of heartburn in patients with healed reflux oesophagitis--results from the maintenance phase of the EXPO study.

    Science.gov (United States)

    Labenz, J; Armstrong, D; Zetterstrand, S; Eklund, S; Leodolter, A

    2009-06-01

    Ability to predict freedom from heartburn relapse during maintenance therapy for healed reflux oesophagitis may facilitate optimal treatment choices for individual patients. To determine factors predicting freedom from heartburn relapse during maintenance proton pump inhibitor therapy in patients with healed reflux oesophagitis. This post-hoc analysis used data from the maintenance phase of the EXPO study (AstraZeneca study code: SH-NEG-0008); 2766 patients with healed reflux oesophagitis and resolved heartburn received once-daily esomeprazole 20 mg or pantoprazole 20 mg for 6 months. Multiple logistic regression analysis determined factors associated with freedom from heartburn relapse. Heartburn relapse rates were lower with esomeprazole than pantoprazole in all subgroups analysed. Esomeprazole treatment was the factor most strongly associated with freedom from heartburn relapse (odds ratio 2.08; P heartburn relapse were Helicobacter pylori infection, greater age, non-obesity, absence of epigastric pain at baseline, pre-treatment nonsevere heartburn and GERD symptom duration heartburn relapse during maintenance proton pump inhibitor therapy for healed reflux oesophagitis, the strongest being choice of proton pump inhibitor. These findings outline the importance of optimizing acid control and identifying predictors of relapse for effective long-term symptom management in reflux oesophagitis patients.

  10. Sustainable resilience in property maintenance: encountering changing weather conditions

    DEFF Research Database (Denmark)

    Cox, Rimante Andrasiunaite; Nielsen, Susanne Balslev

    2014-01-01

    Purpose: The purpose of the study is to develop a methodological approach for project management to integrate sustainability and resilience planning in property maintenance as an incremental strategy for upgrading existing properties to meet new standards for sustainable and climate resilient...... buildings. Background: Current maintenance practice is focused on the technical standard of buildings, with little consideration of sustainability and resilience. There is a need to develop tools for incorporating sustainable resilience into maintenance planning. Approach: The study is primarily theoretical......, developing the concept of sustainable resilience for changing weather conditions Results: The paper suggests a decision support methodology that quantifies sustainable resilience for the analytical stages of property maintenance planning. Practical Implications: The methodology is generic and expected users...

  11. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  12. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  13. A Real-Time Quantitative Condition Alerting and Analysis Support System for Aircraft Maintenance, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Financial constraints and the need for improved operational efficiency are requiring airlines to emphasize "on-condition" maintenance over scheduled maintenance...

  14. Maintenance treatment of Uracil and Tegafur (UFT) in responders following first-line fluorouracil-based chemotherapy in metastatic gastric cancer: a randomized phase II study.

    Science.gov (United States)

    Li, Wenhua; Zhao, Xiaoying; Wang, Huijie; Liu, Xin; Zhao, Xinmin; Huang, Mingzhu; Qiu, Lixin; Zhang, Wen; Chen, Zhiyu; Guo, Weijian; Li, Jin; Zhu, Xiaodong

    2017-06-06

    Maintenance therapy proves to be effective in advanced lung and breast cancer after initial chemotherapy. The purpose of this phase II study was to evaluate the efficacy and safety of Uracil and Tegafur (UFT) maintenance in metastatic gastric cancer patients following the first-line fluorouracil-based chemotherapy. Metastatic gastric cancer patients with stable disease or a better response after the completion of first-line chemotherapy were randomized to oral UFT (360mg/m2 × 2 weeks) every 3 weeks until disease progression/intolerable toxicity or to observation (OBS). The primary endpoint was progression-free survival (PFS); the secondary endpoints were overall survival (OS) and safety. The trial was closed after the interim analysis of the 58 enrolled (120 planned) patients. Median PFS was not improved in the UFT group compared with the OBS group (3.2 months versus 3.6 months, P = 0.752), as well as the median OS (14.2 months for both, P = 0.983). However, subgroup analysis showed that low baseline hemoglobin (maintenance therapy (P = 0.032), while the normal hemoglobin patients benefit from the UFT treatment (P = 0.008). Grade 3 to 4 toxicities in the UFT group were anemia (3.4%), thrombocytopenia (3.4%) and diarrhea (6.9%). This trial did not show superiority of UFT maintenance in non-selected patients responding to fluorouracil-based first-line chemotherapy. The normal hemoglobin level at baseline is a predictive biomarker for favorable patient subsets from the maintenance treatment.

  15. Deactivation, Decontamination and Decommissioning Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, David Shane; Webber, Frank Laverne

    2001-07-01

    This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

  16. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  17. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  18. Measuring compliance during aircraft (Component) redeliveries at KLM engineering & maintenance

    NARCIS (Netherlands)

    Burhani, Shahir; Verhagen, W.J.C.; Curran, Ricky

    2016-01-01

    Aircraft and aircraft components are redelivered to the next operator or owner during the phase-out process. During this process the operator is required by law and contract requirements to show compliance with maintenance procedures. At KLM E&M the phase-out documentation process is under

  19. Jose Cabrera dismantling and decommissioning project

    International Nuclear Information System (INIS)

    Ondaro, Manuel

    2013-01-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  20. Jose Cabrera dismantling and decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Ondaro, Manuel [ENRESA, Madrid (Spain)

    2013-07-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  1. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  2. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  3. Status of maintenance in the US nuclear power industry 1985. Volume 1. Findings and conclusions

    International Nuclear Information System (INIS)

    1986-06-01

    This report presents the findings, conclusions and recommendations derived from activities performed under Phase I of the NRC Maintenance and Surveillance Program (MSP). Findings are based on trends and patterns derived from operational data compiled by the NRC for the period 1980 through 1985, site surveys conducted at eight plants, and questionnaires administered to NRC Resident Inspectors to characterize nuclear power plant maintenance programs and practices. These activities have shown that plant maintenance programs and practices are highly variable from plant-to-plant and are currently undergoing major changes. While measured plant performance has improved overall since 1980, the maintenance-related contribution to reportable events and challenges to safety systems remains high and is increasing by some measures. The findings of Phase I of the MSP confirmed a number of problems in nuclear power plant maintenance which warrant further NRC and industry attention

  4. Regulatory requirements related to maintenance and compliance monitoring

    International Nuclear Information System (INIS)

    Ling, A.K.H.

    1997-01-01

    The maintenance related regulatory requirements are identified in the regulatory documents and licence conditions. Licensee complies with these requirements by operating the nuclear power plant within the safe operating envelope as given in the operating policies and principles and do maintenance according to approved procedures and/or work plans. Safety systems are regularly tested. AECB project officers review and check to ensure that the licensee operates the nuclear power plant in accordance with the regulatory requirements and licence conditions. (author). 6 tabs

  5. A decentralized multidistrict optimization framework for system-wide pavement maintenance resource allocation

    Directory of Open Access Journals (Sweden)

    J. Farhan

    2016-05-01

    Full Text Available Historically, pavement maintenance funds have been allocated based on a centralized programme development process. Such practice, though seemingly convenient, does not lead to optimal allocation of funds since districts generally have different priorities based on the state of development and condition of their respective road networks. This paper proposes a decentralized two-phased optimization framework for pavement maintenance fund allocation considering multiple objectives and cross-district trade-off at the network level. In the proposed two-phased analysis approach, Phase-I focuses on establishing the needs and funds requirements of individual districts given multiple performance targets or objectives, while a system-wide fund appropriation strategy is selected, in Phase-II, given budget and equity constraints across competing districts. The proposed approach is illustrated using a numerical example problem for appropriating funds to three districts. The results indicated that the proposed approach is not only able to evaluate the extent to which various performance targets are achieved at the central and district level, but also maintains equity in distribution of financial resources across districts. Keywords: Pavement maintenance programming, Multiobjective, Multidistrict, Optimized resource allocation, Genetic algorithm, Dynamic programming

  6. Maintenance implications of critical components in ITER CXRS upper port plug design

    NARCIS (Netherlands)

    Koning, J.; Jaspers, R.; Doornink, J.; Ouwehand, B.; Klinkhamer, J.F.F.; Snijders, B.; Sadakov, S.; Heemskerk, C.

    2009-01-01

    Already in the early phase of a design for ITER, the maintenance aspects should be taken into account, since they might have serious implications. This paper presents the arguments in support of the case for the maintainability of the design, notably if this maintenance is to be performed by

  7. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Saegusa, Hiromitsu; Sato, Toshinori; Umeda, Koji; Yasue, Kenichi; Asamori, Koichi; Osawa, Hideaki; Koide, Kaoru; Nagae, Isako; Natsuyama, Ryoko; Mizuno, Takashi; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Yokota, Hideharu; Ishii, Eiichi; Aoyagi, Kazuhei; Nakayama, Masashi; Ito, Hiroaki; Tsusaka, Kimikazu; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2015-08-01

    We have synthesised the research results from Mizunami/Horonobe URLs and geo-stability projects in the second mid-term research phase. It could be used as technical bases for NUMO/Regulator in each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High quality construction techniques and field investigation methods have been developed and implemented and these will be directly applicable to the National Disposal Program (along with general assessments of hazardous natural events and processes). It will be crucial to acquire technical knowledge on decisions of partial backfilling and final closure by actual field experiments in Mizunami/Horonobe URLs as main themes for the next phases. (author)

  8. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  9. Operation and maintenance in the cooling and ventilation group

    OpenAIRE

    Bangert, N

    2003-01-01

    A core team of CERN staff is running the daily operations of the cooling and ventilation equipment at CERN, thus assuring multiple interfaces such as constant contact with the users of existing installations, the project leaders for new installations and intern-divisional communication. As support of this team, re-tendered contracts with external companies for the maintenance and operational tasks have been put into place multiple years ago. Higherlevel maintenance continues to be entrusted t...

  10. Economic analysis of radioactive waste storage and disposal projects

    International Nuclear Information System (INIS)

    Kleinen, P.J.; Starnes, R.B.

    1995-01-01

    Radioactive waste storage and disposal efforts present challenging issues for cost and economic analyses. In particular, legal requirements for states and compact areas to develop radioactive waste disposal sites, combined with closure of some sites, have placed urgency on planning, locating, and constructing storage and disposal sites. Cost analyses of potential projects are important to the decision processes. Principal objectives for cost analyses for projects are to identify all activities, covering the entire project life cycle, and to develop costs for those activities using methods that allow direct comparisons between competing project alternatives. For radioactive waste projects, long project lives ranging from tens of years to 100 or more years must be considered. Alternative, and competing, technologies, designs, and operating plans must be evaluated. Thorough base cost estimates must be made for all project phases: planning, development, licensing/permitting, construction, operations, and maintenance, closure, and post-closure/institutional care. Economic analysis procedures need to accommodate the specific features of each project alternative and facilitate cost comparisons between differing alternatives. Economic analysis assumptions must be developed to address the unusually long project lives involved in radioactive waste projects

  11. Bridge maintenance Program for the City of Columbia, Missouri : final report.

    Science.gov (United States)

    2017-09-22

    The goal of this project was to extend the service lives of bridges located in Columbia, Missouri. The objective of the project was to develop guidelines for bridge maintenance and preservation. The guidelines developed are focused on practical and i...

  12. Soil and groundwater remediation using dual-phase extraction technology

    International Nuclear Information System (INIS)

    Miller, A.W.; Gan, D.R.

    1995-01-01

    A gasoline underground storage tank (UST) was formerly used to fuel vehicles for a hospital in Madison, Wisconsin. Elevated concentrations of gasoline range organics (GRO) were observed in soils and groundwater at the site during the tank removal and a subsequent site investigation. Based on the extent of soil and groundwater contamination, a dual-phase extraction technology was selected as the most cost effective alternative to remediate the site. The dual-phase extraction system includes one extraction well functioning both as a soil vapor extraction (SVE) and groundwater recovery well. After six months of operation, samples collected from the groundwater monitoring wells indicated that the groundwater has been cleaned up to levels below the Wisconsin preventative action limits. The dual-phase extraction system effectively remediated the site in a short period of time, saving both operation and maintenance costs and overall project cost

  13. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    International Nuclear Information System (INIS)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL's control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994

  14. The importance of maintainability in maintenance cost management

    International Nuclear Information System (INIS)

    Allen, R.R.

    1996-01-01

    This paper provides specific examples and results from ongoing projects at Power Plants, and for offshore oil platforms. The paper describes the vital role maintainability has on plant availability. How the application of equipment maintainability principles, if addressed using state of the art computer tools and advanced business processes can bring annual return on investment results as high as 15 to 1. The maintenance process of today and for the future must provide for high plant availability at the lowest possible cost. The high cost of obtaining equipment reliability levels necessary to meet required availability demands has not proved to be sustainable. Therefore new business decision processes that address equipment failures as part of the maintenance process have been developed. Repair costs require that equipment failures be selective and controlled so that a high level of safety and plant availability is assurance. This can only be accomplished by the use of advanced computer tools in the hands of well trained maintenance-engineering specialist. The relationship between Reliability Centered Maintenance (RCM), Condition Directed Planned Maintenance (CDPM), and maintainability is also presented

  15. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  16. What's in It for Me? Maintenance of Certification as an Incentive for Faculty Supervision of Resident Quality Improvement Projects.

    Science.gov (United States)

    Rosenbluth, Glenn; Tabas, Jeffrey A; Baron, Robert B

    2016-01-01

    Residents are required to engage in quality improvement (QI) activities, which requires faculty engagement. Because of increasing program requirements and clinical demands, faculty may be resistant to taking on additional teaching and supervisory responsibilities without incentives. The authors sought to create an authentic benefit for University of California, San Francisco (UCSF) Pediatrics Residency Training Program faculty who supervise pediatrics residents' QI projects by offering maintenance of certification (MOC) Part 4 (Performance in Practice) credit. The authors identified MOC as an ideal framework to both more actively engage faculty who were supervising QI projects and provide incentives for doing so. To this end, in 2011, the authors designed an MOC portfolio program which included faculty development, active supervision of residents, and QI projects designed to improve patient care. The UCSF Pediatrics Residency Training Program's Portfolio Sponsor application was approved by the American Board of Pediatrics (ABP) in 2012, and faculty whose projects were included in the application were granted MOC Part 4 credit. As of December 2013, six faculty had received MOC Part 4 credit for their supervision of residents' QI projects. Based largely on the success of this program, UCSF has transitioned to the MOC portfolio program administered through the American Board of Medical Specialties, which allows the organization to offer MOC Part 4 credit from multiple specialty boards including the ABP. This may require refinements to screening, over sight, and reporting structures to ensure the MOC standards are met. Ongoing faculty development will be essential.

  17. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  18. Status of JSFR development in phase I FaCT project

    International Nuclear Information System (INIS)

    Aoto, Kazumi; Chikazawa, Yoshitaka; Kotake, Shoji; Ito, Takaya

    2011-01-01

    The Fast Reactor Cycle Technology Development (FaCT) project is pursuing commercialization of fast reactor cycle system around 2050 under cooperation of MEXT (Ministry of Education, Culture, Sports, Science and Technology), METI (Ministry of Economy, Trade and Industry), utilities, venders and JAEA (Japan Atomic Energy Agency). As results of the FaCT Phase I, the key technologies for Japan Sodium-cooled Fast Reactor (JSFR) has been evaluated. (author)

  19. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    Energy Technology Data Exchange (ETDEWEB)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  20. A Study on Human Factors in Maintenance of a Nuclear Power Plant (NPP)

    International Nuclear Information System (INIS)

    Park, Young Ho; Seong, Poong Hyun

    2006-01-01

    In human factors research, more attention has been devoted to the operation of a nuclear power plant (NPP) than to their maintenance. However, more NPP incidents are caused by inadequate maintenance rather than by faulty operation. There is a trend in NPP toward introducing digital technology into safety and non-safety systems. This lead to changes of maintenance, and support systems such as diagnosis system, augmentation system and handy terminal will be developed. In this context, it is important to identify tasks of human related to each phase of maintenance and their relation in order to apply those to maintenance. However, there are few researches of human factors in maintenance. This paper studies on framework of cognitive task analysis for developing maintenance support systems

  1. Maintenance of nuclear knowledge in an antinuclear environment

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2008-01-01

    In this work authors present the maintenance of nuclear knowledge in an antinuclear environment in Austria. Participation of the TRIGA Mark II research reactor in the Atominstitut in different courses, in research projects and education is presented.

  2. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  3. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  4. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  5. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  6. Direction of Technology Development for Nuclear Power Plants at the O and M Phase

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu; Park, Hwanpyo; Kim, Younghyun [Korea Institute of Construction Technology, Goyang (Korea, Republic of)

    2014-05-15

    Recently, Korea has attempted to advance overseas markets by securing competitive power in nuclear power technology. In order to develop and operate overall construction management systems with Korea's own brand equipped with sufficient applicability and competitive power in the market abroad and to ensure equal competitive power with other foreign advanced companies of nuclear power plants, Korea has launched a project called 'Data Centric Integration/Automation Technology for NP Project Management System' since July 2011. This project is divided into two phases: the first phase from 2012 to 2016 realizes EPCS stage, and the second phase from 2017 to 2020 extends to O and M stage. Appropriate technology development planning must be established if 'Data Centric Integration/Automation Technology for NP Project Management System' conducted at the first phase would extend to O and M stage at the second phase. Therefore, this study aimed at drawing out the direction of technology development based on present analysis of process at the operational phase of nuclear power plants in Korea conducted as previous study. This study analyzed current operation and maintenance systems first, analyzing the results of differences between the operation process of nuclear plants in Korea which was suggested at the previous study and the process of the Korea Hydro and Nuclear Power Co., Ltd. (hereafter referred to as 'KHNP') and drawing out the direction of technology development for nuclear power plants at the operational phase from the viewpoint of life cycle.

  7. Direction of Technology Development for Nuclear Power Plants at the O and M Phase

    International Nuclear Information System (INIS)

    Jung, Insu; Park, Hwanpyo; Kim, Younghyun

    2014-01-01

    Recently, Korea has attempted to advance overseas markets by securing competitive power in nuclear power technology. In order to develop and operate overall construction management systems with Korea's own brand equipped with sufficient applicability and competitive power in the market abroad and to ensure equal competitive power with other foreign advanced companies of nuclear power plants, Korea has launched a project called 'Data Centric Integration/Automation Technology for NP Project Management System' since July 2011. This project is divided into two phases: the first phase from 2012 to 2016 realizes EPCS stage, and the second phase from 2017 to 2020 extends to O and M stage. Appropriate technology development planning must be established if 'Data Centric Integration/Automation Technology for NP Project Management System' conducted at the first phase would extend to O and M stage at the second phase. Therefore, this study aimed at drawing out the direction of technology development based on present analysis of process at the operational phase of nuclear power plants in Korea conducted as previous study. This study analyzed current operation and maintenance systems first, analyzing the results of differences between the operation process of nuclear plants in Korea which was suggested at the previous study and the process of the Korea Hydro and Nuclear Power Co., Ltd. (hereafter referred to as 'KHNP') and drawing out the direction of technology development for nuclear power plants at the operational phase from the viewpoint of life cycle

  8. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  9. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  10. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  11. Small business innovation research. Abstracts of completed 1987 phase 1 projects

    Science.gov (United States)

    1989-01-01

    Non-proprietary summaries of Phase 1 Small Business Innovation Research (SBIR) projects supported by NASA in the 1987 program year are given. Work in the areas of aeronautical propulsion, aerodynamics, acoustics, aircraft systems, materials and structures, teleoperators and robotics, computer sciences, information systems, spacecraft systems, spacecraft power supplies, spacecraft propulsion, bioastronautics, satellite communication, and space processing are covered.

  12. Draft Air Pathway Report: Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-20

    This report summarizes the air pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating historical radiation doses that could have been received by populations near the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the air-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the 10 counties nearest the Hanford Site from atmospheric releases of iodine-131 from the site from 1944--1947. Phase 1 demonstrated the following: HEDR-calculated source-term estimates of iodine-131 releases to the atmosphere were within 20% of previously published estimates; calculated vegetation concentrations of iodine-131 agree well with previously published measurements; the highest of the Phase 1 preliminary dose estimates to the thyroid are consistent with independent, previously published estimates of doses to maximally exposed individuals; and relatively crude, previously published measurements of thyroid burdens for Hanford workers are in the range of average burdens that the HEDR model estimated for similar reference individuals'' for the period 1944--1947. 4 refs., 10 figs., 9 tabs.

  13. Comparing Weight Loss-Maintenance Outcomes of a Worksite-Based Lifestyle Program Delivered via DVD and Face-to-Face: A Randomized Trial.

    Science.gov (United States)

    Ing, Claire Townsend; Miyamoto, Robin E S; Fang, Rui; Antonio, Mapuana; Paloma, Diane; Braun, Kathryn L; Kaholokula, Joseph Keawe'aimoku

    2018-03-01

    Native Hawaiians and other Pacific Islanders have high rates of overweight and obesity compared with other ethnic groups in Hawai'i. Effective weight loss and weight loss-maintenance programs are needed to address obesity and obesity-related health inequities for this group. Compare the effectiveness of a 9-month, worksite-based, weight loss-maintenance intervention delivered via DVD versus face-to-face in continued weight reduction and weight loss maintenance beyond the initial weight loss phase. We tested DVD versus face-to-face delivery of the PILI@Work Program's 9-month, weight loss-maintenance phase in Native Hawaiian-serving organizations. After completing the 3-month weight loss phase, participants ( n = 217) were randomized to receive the weight loss-maintenance phase delivered via trained peer facilitators or DVDs. Participant assessments at randomization and postintervention included weight, height, blood pressure, physical functioning, exercise frequency, and fat intake. Eighty-three face-to-face participants were retained at 12 months (74.1%) compared with 73 DVD participants (69.5%). There was no significant difference between groups in weight loss or weight loss maintenance. The number of lessons attended in Phase 1 of the intervention (β = 0.358, p = .022) and baseline systolic blood pressure (β = -0.038, p = .048) predicted percent weight loss at 12 months. Weight loss maintenance was similar across groups. This suggests that low-cost delivery methods for worksite-based interventions targeting at-risk populations can help address obesity and obesity-related disparities. Additionally, attendance during the weight loss phase and lower baseline systolic blood pressure predicted greater percent weight loss during the weight loss-maintenance phase, suggesting that early engagement and initial physical functioning improve long-term weight loss outcomes.

  14. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  15. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  16. Simplified absolute phase retrieval of dual-frequency fringe patterns in fringe projection profilometry

    Science.gov (United States)

    Lu, Jin; Mo, Rong; Sun, Huibin; Chang, Zhiyong; Zhao, Xiaxia

    2016-04-01

    In fringe projection profilometry, a simplified method is proposed to recover absolute phase maps of two-frequency fringe patterns by using a unique mapping rule. The mapping rule is designed from the rounded phase values to the fringe order of each pixel. Absolute phase can be recovered by the fringe order maps. Unlike the existing techniques, where the lowest frequency of dual- or multiple-frequency fringe patterns must be single, the presented method breaks the limitation and simplifies the procedure of phase unwrapping. Additionally, due to many issues including ambient light, shadow, sharp edges, step height boundaries and surface reflectivity variations, a novel framework of automatically identifying and removing invalid phase values is also proposed. Simulations and experiments have been carried out to validate the performances of the proposed method.

  17. Practical experience with a data collection project: the OREDA project

    International Nuclear Information System (INIS)

    Sandtorv, Helge A.; Hokstad, Per; Thompson, David W.

    1996-01-01

    Experience data on the reliability of equipment has become vital to many types of engineering and maintenance analyses. The consequences of incorrect design or poor maintenance may adversely affect: safety, the environment or cost in most categories of process industries, and, in particular, offshore exploration and production industries. The OREDA project is a data collection programme for the offshore industry which has been operating since the early 80's. A high level of knowledge has been gained from this programme on: specification of data, data collection methods and the utilization of data. Some of the results and the knowledge gained from this project are presented in this paper

  18. Modeling the reliability and maintenance costs of wind turbines using Weibull analysis

    Energy Technology Data Exchange (ETDEWEB)

    Vachon, W.A. [W.A. Vachon & Associates, Inc., Manchester, MA (United States)

    1996-12-31

    A general description is provided of the basic mathematics and use of Weibull statistical models for modeling component failures and maintenance costs as a function of time. The applicability of the model to wind turbine components and subsystems is discussed with illustrative examples of typical component reliabilities drawn from actual field experiences. Example results indicate the dominant role of key subsystems based on a combination of their failure frequency and repair/replacement costs. The value of the model is discussed as a means of defining (1) maintenance practices, (2) areas in which to focus product improvements, (3) spare parts inventory, and (4) long-term trends in maintenance costs as an important element in project cash flow projections used by developers, investors, and lenders. 6 refs., 8 figs., 3 tabs.

  19. 360-degrees profilometry using strip-light projection coupled to Fourier phase-demodulation.

    Science.gov (United States)

    Servin, Manuel; Padilla, Moises; Garnica, Guillermo

    2016-01-11

    360 degrees (360°) digitalization of three dimensional (3D) solids using a projected light-strip is a well-established technique in academic and commercial profilometers. These profilometers project a light-strip over the digitizing solid while the solid is rotated a full revolution or 360-degrees. Then, a computer program typically extracts the centroid of this light-strip, and by triangulation one obtains the shape of the solid. Here instead of using intensity-based light-strip centroid estimation, we propose to use Fourier phase-demodulation for 360° solid digitalization. The advantage of Fourier demodulation over strip-centroid estimation is that the accuracy of phase-demodulation linearly-increases with the fringe density, while in strip-light the centroid-estimation errors are independent. Here we proposed first to construct a carrier-frequency fringe-pattern by closely adding the individual light-strip images recorded while the solid is being rotated. Next, this high-density fringe-pattern is phase-demodulated using the standard Fourier technique. To test the feasibility of this Fourier demodulation approach, we have digitized two solids with increasing topographic complexity: a Rubik's cube and a plastic model of a human-skull. According to our results, phase demodulation based on the Fourier technique is less noisy than triangulation based on centroid light-strip estimation. Moreover, Fourier demodulation also provides the amplitude of the analytic signal which is a valuable information for the visualization of surface details.

  20. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    International Nuclear Information System (INIS)

    Smellie, J.A.T.

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission

  1. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    Energy Technology Data Exchange (ETDEWEB)

    Smellie, J.A.T. [ed.] [Conterra AB, Uppsala (Sweden)

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission.

  2. Profilometry of discontinuous solids by means of co-phased demodulation of projected fringes with RGB encoding

    Science.gov (United States)

    Padilla, J. M.; Servin, M.; Garnica, G.

    2015-05-01

    Here we describe a 2-projectors and 1-camera setup for profilometry of discontinuous solids by means of co-phased demodulation of projected fringes and red, green, and blue (RGB) multichannel operation. The dual projection configuration for this profilometer is proposed to solve efficiently specular regions and self-occluding shadows due to discontinuities, which are the main drawbacks for a 1-projector 1-camera configuration. This is because the regions where shadows and specular reflections are generated, and the fringe contrast drops to zero, are in general different for each projection direction; thus, the resulting fringe patterns will have complementary phase information. Multichannel RGB operation allows us to work simultaneously with both projectors and to record independently the complementary fringe patterns phase-modulated by the 3D profile of the object under study. In other words, color encoding/decoding reduces the acquisition time respect to one-at-a-time grayscale operation and, in principle, enables the study of dynamic phenomena. The co-phased demodulation method implemented in this work benefits from the complex (analytic) nature of the output signals estimated with most phase demodulation methods (such as the Fourier method, and temporal phaseshifting algorithms). This allowed us to straightforwardly generate a single phase-map well-defined for the entire area of interest. Finally we assessed our proposed profilometry setup by measuring a fractured spherical cap made of (uncoated) expanded polystyrene. The results were satisfactory but in the authors' opinion this must be considered a preliminary report.

  3. Dynamic environment for training for maintenance

    International Nuclear Information System (INIS)

    Sanchez, F.; Gonzalez, F.; Marti, F.

    2001-01-01

    The governing board of TECNATOM approved a project for creating a maintenance training center in 1995. The objective was to cover training necessities identified in the maintenance area, mainly in issues related with continuous training, recycling and professional development. A team of instructors in the 3 specialties: mechanical, electrical and instrumentation, was selected. Written training material has been developed. New facilities and adequate mock-ups for training has been acquired, more than 100 didactical units have been developed. The mock-ups are real components from nuclear power plants, they have been adapted to fulfill the didactical function. New courses and mock-ups are being developed as new customer necessities are being identified. (A.C.)

  4. Dynamic environment for training for maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, F.; Gonzalez, F.; Marti, F. [Tecnatom, s.a., Madrid (Spain)

    2001-07-01

    The governing board of TECNATOM approved a project for creating a maintenance training center in 1995. The objective was to cover training necessities identified in the maintenance area, mainly in issues related with continuous training, recycling and professional development. A team of instructors in the 3 specialties: mechanical, electrical and instrumentation, was selected. Written training material has been developed. New facilities and adequate mock-ups for training has been acquired, more than 100 didactical units have been developed. The mock-ups are real components from nuclear power plants, they have been adapted to fulfill the didactical function. New courses and mock-ups are being developed as new customer necessities are being identified. (A.C.)

  5. Point Lepreau Refurbishment Project. Programmable digital comparator (PDC) replacement for SDS1 and SDS2 - update 1

    International Nuclear Information System (INIS)

    Fraser, K.G.; Ichiyen, N.M.; Condor, A.E.; Thompson, P.D.

    2005-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station starting in April 2008. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the Programmable Digital Comparators for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the progress of the Phase 2 ESA program as well as the planned future (Phase 2) work for the PDC replacement for both shutdown systems. (author)

  6. To select the best tool for generating 3D maintenance data and to set the detailed process for obtaining the 3D maintenance data

    Science.gov (United States)

    Prashanth, B. N.; Roy, Kingshuk

    2017-07-01

    Three Dimensional (3D) maintenance data provides a link between design and technical documentation creating interactive 3D graphical training and maintenance material. It becomes difficult for an operator to always go through huge paper manuals or come running to the computer for doing maintenance of a machine which makes the maintenance work fatigue. Above being the case, a 3D animation makes maintenance work very simple since, there is no language barrier. The research deals with the generation of 3D maintenance data of any given machine. The best tool for obtaining the 3D maintenance is selected and the tool is analyzed. Using the same tool, a detailed process for extracting the 3D maintenance data for any machine is set. This project aims at selecting the best tool for obtaining 3D maintenance data and to select the detailed process for obtaining 3D maintenance data. 3D maintenance reduces use of big volumes of manuals which creates human errors and makes the work of an operator fatiguing. Hence 3-D maintenance would help in training and maintenance and would increase productivity. 3Dvia when compared with Cortona 3D and Deep Exploration proves to be better than them. 3Dvia is good in data translation and it has the best renderings compared to the other two 3D maintenance software. 3Dvia is very user friendly and it has various options for creating 3D animations. Its Interactive Electronic Technical Publication (IETP) integration is also better than the other two software. Hence 3Dvia proves to be the best software for obtaining 3D maintenance data of any machine.

  7. Youth's social network structures and peer influences: study protocol MyMovez project - Phase I.

    Science.gov (United States)

    Bevelander, Kirsten E; Smit, Crystal R; van Woudenberg, Thabo J; Buijs, Laura; Burk, William J; Buijzen, Moniek

    2018-04-16

    Youth are an important target group for social network interventions, because they are particularly susceptible to the adaptation of healthy and unhealthy habits and behaviors of others. They are surrounded by 'social influence agents' (i.e., role models such as family, friends and peers) that co-determine their dietary intake and physical activity. However, there is a lack of systematic and comprehensive research on the implementation of a social network approach in health campaigns. The MyMovez research project aims to fill this gap by developing a method for effective social network campaign implementation. This protocol paper describes the design and methods of Phase I of the MyMovez project, aiming to unravel youth's social network structures in combination with individual, psychosocial, and environmental factors related to energy intake and expenditure. In addition, the Wearable Lab is developed to enable an attractive and state-of-the-art way of collecting data and online campaign implementation via social networks. Phase I of the MyMovez project consists of a large-scale cross-sequential cohort study (N = 953; 8-12 and 12-15 y/o). In five waves during a 3-year period (2016-2018), data are collected about youth's social network exposure, media consumption, socialization experiences, psychological determinants of behavior, physical environment, dietary intake (snacking and drinking behavior) and physical activity using the Wearable Lab. The Wearable Lab exists of a smartphone-based research application (app) connected to an activity tracking bracelet, that is developed throughout the duration of the project. It generates peer- and self-reported (e.g., sociometric data and surveys) and experience sampling data, social network beacon data, real-time physical activity data (i.e., steps and cycling), location information, photos and chat conversation data from the app's social media platform Social Buzz. The MyMovez project - Phase I is an innovative cross

  8. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  9. The present status and future growth of maintenance in US manufacturing: results from a pilot survey.

    Science.gov (United States)

    Jin, Xiaoning; Siegel, David; Weiss, Brian A; Gamel, Ellen; Wang, Wei; Lee, Jay; Ni, Jun

    A research study was conducted (1) to examine the practices employed by US manufacturers to achieve productivity goals and (2) to understand what level of intelligent maintenance technologies and strategies are being incorporated into these practices. This study found that the effectiveness and choice of maintenance strategy were strongly correlated to the size of the manufacturing enterprise; there were large differences in adoption of advanced maintenance practices and diagnostics and prognostics technologies between small and medium-sized enterprises (SMEs). Despite their greater adoption of maintenance practices and technologies, large manufacturing organizations have had only modest success with respect to diagnostics and prognostics and preventive maintenance projects. The varying degrees of success with respect to preventative maintenance programs highlight the opportunity for larger manufacturers to improve their maintenance practices and use of advanced prognostics and health management (PHM) technology. The future outlook for manufacturing PHM technology among the manufacturing organizations considered in this study was overwhelmingly positive; many manufacturing organizations have current and planned projects in this area. Given the current modest state of implementation and positive outlook for this technology, gaps, future trends, and roadmaps for manufacturing PHM and maintenance strategy are presented.

  10. Large-scale demonstration of reliability centered maintenance at two nuclear generating stations

    International Nuclear Information System (INIS)

    Gaertner, J.P.; Edgar, C.; Rodin, M.E.

    1989-01-01

    This paper reports that after successful single-system pilot applications of Reliability Centered Maintenance (RCM) at various utilities, EPRI with Rochester Gas and Electric and Southern California Edison is undertaking multiple-system applications of RCM at their respective nuclear plants. The objective is to demonstrate the feasibility and cost-effectiveness of large-scale RCM application. In addition, each utility has plant-specific objectives to improve maintenance and plant availability. Each project has selected a prioritized list of some 15-20 systems on which to perform RCM. Each project is employing somewhat different RCM analysis methods, both of which conform to a global RCM definition applicable to all EPRI RCM work to date. Each project has developed important insights for improving cost and value of future analyses. Both projects will have applied the RCM process, including implementation, on several plant systems by April 1989

  11. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  12. Self-correction of projector nonlinearity in phase-shifting fringe projection profilometry.

    Science.gov (United States)

    Lü, Fuxing; Xing, Shuo; Guo, Hongwei

    2017-09-01

    In phase-shifting fringe projection profilometry, the luminance nonlinearity of the used projector has been recognized as one of the most crucial factors decreasing the measurement accuracy. To solve this problem, this paper presents a self-correcting technique that allows us to suppress the effect of the projector nonlinearity in the absence of any calibration data regarding the projector intensities or regarding the phase errors. In its first step, the standard phase-shifting algorithm is used to recover the phases, as well as the background intensities and the modulations. Using these results enables normalizing the fringe patterns, for ridding them of the effects of the background and modulations. Second, we smooth the calculated phase map by use of a low-pass filter in order to remove the ripple-like phase errors induced by the projector nonlinearity. Third, we determine a polynomial representing the projector nonlinearity by fitting the curve of the normalized fringe intensities against the cosine values of the smoothed phases. Finally, we correct the phase errors using the curve just obtained. Doing these steps in an iterative way eventually results in a phase map and, further, a 3D shape with their artifacts induced by the projector nonlinearity suppressed significantly. Experimental results demonstrate that this technique offers some advantages over others. It does not require a prior calibration of the projector, thus being suitable for dealing with a time-variant nonlinearity; its pointwise operation protects the edges and details of the measurement results from being blurred; and it works well with very few fringe patterns and is efficient in image capturing.

  13. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  14. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  15. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  16. Virtual and augmented reality for training on maintenance; Realidad virutal y aumentada para la formacion en mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, F.

    2001-07-01

    This paper presents two projects focused to support training on maintenance using new technologies. Both projects aims at specifying. designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Virtual Reality (VIRMAN) and Augmented Reality (STARMATE) techniques. VIRMAN project is dedicated to training course development on maintenance using Virtual Reality. It based in the animation of three dimension images for component assembly/de-assembly or equipment movements. STARMATE will rely on Augmented Reality techniques which is a growing area in virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene generated by a computer augmenting the reality with additional information. (Author)

  17. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  18. Randomized, phase III study of gemcitabine or erlotinib maintenance therapy versus observation, with predefined second-line treatment, after cisplatin-gemcitabine induction chemotherapy in advanced non-small-cell lung cancer.

    Science.gov (United States)

    Pérol, Maurice; Chouaid, Christos; Pérol, David; Barlési, Fabrice; Gervais, Radj; Westeel, Virginie; Crequit, Jacky; Léna, Hervé; Vergnenègre, Alain; Zalcman, Gérard; Monnet, Isabelle; Le Caer, Hervé; Fournel, Pierre; Falchero, Lionel; Poudenx, Michel; Vaylet, Fabien; Ségura-Ferlay, Céline; Devouassoux-Shisheboran, Mojgan; Taron, Miquel; Milleron, Bernard

    2012-10-01

    This phase III study investigated whether continuation maintenance with gemcitabine or switch maintenance with erlotinib improves clinical outcome compared with observation in patients with advanced non-small-cell lung cancer (NSCLC) whose disease was controlled after cisplatin-gemcitabine induction chemotherapy. Four hundred sixty-four patients with stage IIIB/IV NSCLC without tumor progression after four cycles of cisplatin-gemcitabine were randomly assigned to observation or to gemcitabine (1,250 mg/m(2) days 1 and 8 of a 3-week cycle) or daily erlotinib (150 mg/day) study arms. On disease progression, patients in all three arms received pemetrexed (500 mg/m(2) once every 21 days) as predefined second-line therapy. The primary end point was progression-free survival (PFS). PFS was significantly prolonged by gemcitabine (median, 3.8 v 1.9 months; hazard ratio [HR], 0.56; 95% CI, 0.44 to 0.72; log-rank P benefit was consistent across all clinical subgroups. Both maintenance strategies resulted in a nonsignificant improvement in overall survival (OS); patients who received second-line pemetrexed or with a performance status of 0 appeared to derive greater benefit. Exploratory analysis showed that magnitude of response to induction chemotherapy may affect the OS benefit as a result of gemcitabine maintenance. Maintenance gemcitabine and erlotinib were well tolerated with no unexpected adverse events. Gemcitabine continuation maintenance or erlotinib switch maintenance significantly reduces disease progression in patients with advanced NSCLC treated with cisplatin-gemcitabine as first-line chemotherapy. Response to induction chemotherapy may affect OS only for continuation maintenance.

  19. Switch maintenance chemotherapy using S-1 with or without bevacizumab in patients with advanced non-small cell lung cancer: a phase II study.

    Science.gov (United States)

    Niho, Seiji; Ohe, Yuichiro; Ohmatsu, Hironobu; Umemura, Shigeki; Matsumoto, Shingo; Yoh, Kiyotaka; Goto, Koichi

    2017-06-01

    We conducted this single-institute; prospective, non-randomized parallel two-arm phase II study to evaluate the efficacy and safety of switch maintenance chemotherapy with S-1 after induction therapy with a platinum-based regimen in patients with advanced non-small cell lung cancer (NSCLC). Patients not showing disease progression after induction platinum-based chemotherapy received S-1 at the dose of 40mg/m 2 twice daily for 14 consecutive days, every three weeks, with or without bevacizumab (Bev) at the dose of 15mg/kg. In cases where the induction chemotherapy regimen contained Bev, Bev was used as continuation maintenance chemotherapy where appropriate. The efficacy/toxicity of switch maintenance chemotherapy with S-1 and S-1+Bev was evaluated separately. The primary end point of this study was the treatment success rate at three months after the start of S-1 treatment. Between July 2010 and January 2014, 79 patients were enrolled, of which 78 were found to be eligible for inclusion in this study. The treatment success rate at three months was 28.2% (90% confidence interval (CI), 7.1-17.1%) in the S-1 group and 64.1% (90% CI, 50.0-76.8%) in the S-1+Bev group. The primary endpoint was met in the S-1+Bev group. The median PFS and OS were 2.6 months and 11.0 months in the S-1 group, and 4.6 months and 19.9 months in the S-1+Bev group, respectively. The most common grade three toxicity was neutropenia (10% incidence in the S-1+Bev group). There were no cases of febrile neutropenia. Switch maintenance chemotherapy with S-1 in combination with continuation maintenance chemotherapy with bevacizumab yielded modest efficacy with mild and acceptable toxicities. Copyright © 2017. Published by Elsevier B.V.

  20. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem

    Directory of Open Access Journals (Sweden)

    Jianfei Ye

    2015-01-01

    Full Text Available In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.

  1. Impacts of building information modeling on facility maintenance management

    Energy Technology Data Exchange (ETDEWEB)

    Ahamed, Shafee; Neelamkavil, Joseph; Canas, Roberto [Centre for Computer-assisted Construction Technologies, National Research Council of Canada, London, Ontario (Canada)

    2010-07-01

    Building information modeling (BIM) is a digital representation of the physical and functional properties of a building; it has been used by construction professionals for a long time and stakeholders are now using it in different aspects of the building lifecycle. This paper intends to present how BIM impacts the construction industry and how it can be used for facility maintenance management. The maintenance and operations of buildings are in most cases still managed through the use of drawings and spreadsheets although life cycle costs of a building are significantly higher than initial investment costs; thus, the use of BIM could help in achieving a higher efficiency and so important benefits. This study is part of an ongoing research project, the nD modeling project, which aims at predicting building energy consumption with better accuracy.

  2. Maintenance cost avoidance through comprehensive condition monitoring

    International Nuclear Information System (INIS)

    Miller, G.P.; McClymonds, S.L.

    1990-01-01

    Condition monitoring, the measurement and trending of a critical parameter for predictive maintenance, has reached new levels of acceptance and application within the utility and manufacturing industry. Commercially available systems extend well beyond traditional vibration-monitoring systems to include such areas as online wear, crack and leak detection, and stress monitoring. The challenge facing industry is to integrate the information generated from condition monitoring. Current studies indicate that the effectiveness of predictive maintenance depends much more on the program that is established to apply the monitoring techniques than on the monitoring equipment itself. This paper presents a five-phase approach to developing a condition monitoring program

  3. A test case of computer aided motion planning for nuclear maintenance operation

    International Nuclear Information System (INIS)

    Schmitzberger, E.; Bouchet, J.L.; Schmitzberger, E.

    2001-01-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  4. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  5. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  6. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  7. LS1 Report: Preparatory phase complete

    CERN Multimedia

    Katy Foraz

    2013-01-01

    The preparatory phase in the LHC which includes electrical and leak test is now completed. The field is now free for consolidation, upgrade and maintenance activities.   Three magnets have been replaced in sector 7-8 and a special intervention team is now connecting new magnets that have been installed. Two magnets of sector 1-2 will be exchanged this week. The R2E project is progressing well: the power converters are being removed at points 1 and 7, while the protection works required prior to any civil engineering works commencing are almost finished at point 5. Moreover, many other activities are taking place in LHC, including the consolidation of the cryo line, and the maintenance of radio-frequency systems and cabling. The activities in the injector complex are also in full gear. Sixteen magnets at the SPS are being exchanged, and the pick-up tank of AD is now back in place. Meanwhile, the PS cranes are being exchanged and the old PS ventilation system is being replaced. The interconnecti...

  8. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  9. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  10. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  11. EX8000 ramps up preparation phase in Horizon oil sands project

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2006-07-15

    This article presented details of Hitachi's EX8000 hydraulic shovel, a key piece of equipment that will be used throughout the extensive mine preparation phase of the Horizon oil sands project. Within 2 years, the project expects to produce over 200,000 barrels of oil per day. However, more than 400 million cubic metres of soil will need to be moved before production can begin. In order to remain on schedule, overburden must be removed in massive volumes. With a 52.3 cubic yard bucket, the Hitachi EX8000 has the capacity to feed a dozen 320 metric tonne haul trucks as well as several smaller 282 metric tonne trucks, and can fill each truck in 4 passes. Material is now being moved by to an area in which dikes are being constructed to house water generated in the refining process. Stockpiling, relocation and reclamation phases will follow as the project progresses. In order to reach the oil, as much as 75 feet of overburden must be removed, including layers of sandstone, limestone, trap rock and other materials. Once the overburden has been removed, oil sand layers are also often intermixed with other materials. The EX8000 can separate the tramp material from the oil sands, improving the overall efficiency of the operation. The Alberta-based North American Construction Group, who have a 10-year contract with Canadian Natural Resources Ltd. for the Horizon project, owns more than 100 Hitachi units in various sizes and has already purchased another EX8000 which is slated for delivery in the Fall of 2006. It was concluded that the company has purchased hundreds of new trucks to handle added volumes of materials being moved as the oil sands industry gains momentum. 3 figs.

  12. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  13. AN ANALYSIS OF MAINTENANCE PERFORMANCE SYSTEMS IN THE SOUTH AFRICAN MINING INDUSTRY

    Directory of Open Access Journals (Sweden)

    Kotze, R. L. M.

    2012-11-01

    Full Text Available The measurement of performance is an essential part of the management process. The planning function usually defines the goals and objectives for the business enterprise or division of the enterprise. The control function should monitor the performance measures and establish corrective action if actual performance deviates significantly from planned performance. Maintenance performance measurement is therefore essential to ensure that maintenance objectives are achieved, and that maintenance adds value for the company. The objective of this paper is to discuss the findings of a project that investigated aspects of the maintenance performance system of a number of mining companies in South Africa. The findings of a survey indicated that maintenance performance management is not yet used to its full potential in the mining industry.

  14. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  15. Maintenance strategy and availabity increasing of a gas compression station in the oil industry

    Directory of Open Access Journals (Sweden)

    Nilis Adriano dos Santos

    2016-03-01

    Full Text Available The purpose of this article was to propose a maintenance strategy and a set of improvement actions for increasing the availability in a compression station of waste gases from the petroleum distillation process, composed of two alternative compressors A and B in a plant of the oil industry. The research method was the quantitative modeling. The methodology includes the calculation of the current availability and suggesting actions to raise it. Time to repair (TTR and time between failures (TBF were modeled for the individual compressors and for the gas compression station as a whole. With the average values of the models (MTBF and MTTR were calculated individual availabilities of A and B (32.4% and 83.3%, respectively and global, 96.7%. The data were collected from the company's information system. By the form factors associated with TBF, it was possible to affirm that, despite operating for over twenty years, both machines are in the premature failures phase. This fact is due to the exchange of raw materials, which occurred about five years ago: the plant proceeded to process heavier oil, originated from the pre-salt layer, for which the installation was not designed. Such divergence may be characterized as a design fault, associated with the corrective maintenance strategy. Finally, a list of improvements projects was presented to increase the availability of the post and terminate the phase of premature failures.

  16. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  17. Maintenance planning for transmission routes with medium voltage overlines - experience within the framework of two pilot projects; Trassenpflegeplanung fuer Mittel- und Hochspannungsfreileitungen - Erfahrungen von zwei Pilotprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Geiges, H. [Ingenieurbuero Geiges, Freiraum- und Landschaftsplanung, Laumersheim (Germany)

    1997-11-03

    On the basis of the `VDEW Orientation Aid for Maintenance Measures in Transmission Routes` two pilot projects were selected in a 110 kV and a 20 kV overhead transmission route. (orig.) [Deutsch] Auf der Grundlage der `VDEW-Orientierungshilfe zu Pflegemassnahmen in Leitungstrassen` wurden Pilotprojekte in einer 110-kV- und in einer 20-kV-Freileitungstrasse im suedlichen Pfaelzerwald ausgewaehlt. (orig.)

  18. Establishing an In-House Wind Maintenance Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  19. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  20. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  1. OECD/NEA Sandia Fuel Project phase I: Benchmark of the ignition testing

    Energy Technology Data Exchange (ETDEWEB)

    Adorni, Martina, E-mail: martina_adorni@hotmail.it [UNIPI (Italy); Herranz, Luis E. [CIEMAT (Spain); Hollands, Thorsten [GRS (Germany); Ahn, Kwang-II [KAERI (Korea, Republic of); Bals, Christine [GRS (Germany); D' Auria, Francesco [UNIPI (Italy); Horvath, Gabor L. [NUBIKI (Hungary); Jaeckel, Bernd S. [PSI (Switzerland); Kim, Han-Chul; Lee, Jung-Jae [KINS (Korea, Republic of); Ogino, Masao [JNES (Japan); Techy, Zsolt [NUBIKI (Hungary); Velazquez-Lozad, Alexander; Zigh, Abdelghani [USNRC (United States); Rehacek, Radomir [OECD/NEA (France)

    2016-10-15

    Highlights: • A unique PWR spent fuel pool experimental project is analytically investigated. • Predictability of fuel clad ignition in case of a complete loss of coolant in SFPs is assessed. • Computer codes reasonably estimate peak cladding temperature and time of ignition. - Abstract: The OECD/NEA Sandia Fuel Project provided unique thermal-hydraulic experimental data associated with Spent Fuel Pool (SFP) complete drain down. The study conducted at Sandia National Laboratories (SNL) was successfully completed (July 2009 to February 2013). The accident conditions of interest for the SFP were simulated in a full scale prototypic fashion (electrically heated, prototypic assemblies in a prototypic SFP rack) so that the experimental results closely represent actual fuel assembly responses. A major impetus for this work was to facilitate severe accident code validation and to reduce modeling uncertainties within the codes. Phase I focused on axial heating and burn propagation in a single PWR 17 × 17 assembly (i.e. “hot neighbors” configuration). Phase II addressed axial and radial heating and zirconium fire propagation including effects of fuel rod ballooning in a 1 × 4 assembly configuration (i.e. single, hot center assembly and four, “cooler neighbors”). This paper summarizes the comparative analysis regarding the final destructive ignition test of the phase I of the project. The objective of the benchmark is to evaluate and compare the predictive capabilities of computer codes concerning the ignition testing of PWR fuel assemblies. Nine institutions from eight different countries were involved in the benchmark calculations. The time to ignition and the maximum temperature are adequately captured by the calculations. It is believed that the benchmark constitutes an enlargement of the validation range for the codes to the conditions tested, thus enhancing the code applicability to other fuel assembly designs and configurations. The comparison of

  2. Ingénierie de la maintenance De la conception à l'exploitation d'un bien

    CERN Document Server

    Francastel, Jean-Claude

    2003-01-01

    La maintenance a évolué : d’abord confinée à l’entretien des équipements “réparer“ les pannes puis élargie à leur surveillance “prévoir” les pannes elle est intégrée aujourd’hui dès la phase de conception du produit avec notamment le concept de “maintenabilité” du produit. L’ingénierie de maintenance désigne ce processus d’accompagnement d’un bien industriel durant toutes les phases de son cycle de vie de la conception au démantèlement qui permet d’optimiser l’exploitation de ce bien et son coût global life cycle cost. Cet ouvrage décrit les différentes phases du cycle de vie en exposant les techniques qui permettent d’intégrer à chaque étape les concepts de maintenance.

  3. Fusion reactor remote maintenance study. Final report

    International Nuclear Information System (INIS)

    Sniderman, M.

    1979-04-01

    An analysis of a major maintenance operation, the remote replacement of a modular sector of a tokamak reactor, was performed in substantial detail. Specific assumptions were developed which included concepts from various existing designs so that the operation which was studied includes some design features generic to any fusion reactor design. Based on the work performed in this study, the principal conclusions are: (1) It appears feasible to design a tokamak fusion reactor plant with availability comparable to existing fossil and fission plants, but this will require diligence and comprehensive planning during the complete design phase. (2) Since the total fusion program is paced by the success of each device, maintenance considerations must be incorporated into each device during design, even if the device is an experimental unit. (3) Innovative approaches, such as automatic computer controlled operations, should be developed so that large step reductions in planned maintenance times can be achieved

  4. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  5. Advanced Ground Systems Maintenance Enterprise Architecture Project

    Science.gov (United States)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  6. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    Energy Technology Data Exchange (ETDEWEB)

    Gasper, John R. [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory; Wigmosta, Mark S. [PNNL; Voisin, Nathalie [PNNL; Rakowski, Cynthia [PNNL; Coleman, Andre [PNNL; Lowry, Thomas S. [SNL

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  7. Supporting developers in addressing maintenance aspects: an empirical study in the industrial equipment manufacturing industry

    NARCIS (Netherlands)

    Mulder, W.

    2016-01-01

    Addressing maintenance aspects has become increasingly important in development projects of industrial equipment. Developers of such equipment need to address the maintenance aspects in order to achieve competitive equipment and service offerings. This research focuses on the identification of the

  8. A training simulator ensures the competence of operating and maintenance staff

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L. [ed.

    1997-11-01

    IVO Generation Services Ltd (IGS) has overall responsibility made on the basis of long-term contracts for the operation and maintenance of the customers` power plants. Partnership is the key concept, and customers are thus able to concentrate on their own specific business activities. Research and development projects are primarily aimed at cutting the customer`s power generation costs and at increasing the efficiency of operation and maintenance

  9. Electrical predictive maintenance at Trillo I Nuclear Power Plant

    International Nuclear Information System (INIS)

    Vicente, L. R.; Fernandez de la Mata, R.; Cano Gonzalez, J. C.

    1998-01-01

    An electrical predictive maintenance plan is currently being put into effect at Trillo I Nuclear Power Plant which is initially being applied to three types of equipment: motors, transformers and motor-driven valves. This paper describes the different phases considered in the implementation of the Predictive Maintenance Plan: study of existing techniques for such equipment (tangoδ, spectral analysis of stator current, chromatographic analysis of gases, spectral analysis of the axial stray magnetic flux, etc), study of the special characteristics of the electrical equipment at Trillo NPP, analysis of applicable techniques (characteristic parameters, alert-alarm values, experience with such techniques, etc), analysis of machine history records, study of the optimum preventive-predictive case, study of applicable frequencies and definition of the computerised predictive maintenance management tool. With the exception of the computerised predictive maintenance management applications which are presently being implemented, all the activities described above have been carried out on the three types of equipment mentioned. (Author)

  10. Intravenous immunoglobulin for maintenance treatment of multifocal motor neuropathy: A multi-center, open-label, 52-week phase 3 trial.

    Science.gov (United States)

    Kuwabara, Satoshi; Misawa, Sonoko; Mori, Masahiro; Iwai, Yuta; Ochi, Kazuhide; Suzuki, Hidekazu; Nodera, Hiroyuki; Tamaoka, Akira; Iijima, Masahiro; Toda, Tatsushi; Yoshikawa, Hiroo; Kanda, Takashi; Sakamoto, Ko; Kusunoki, Susumu; Sobue, Gen; Kaji, Ryuji

    2018-04-10

    Intravenous immunoglobulin (IVIg) therapy is currently the only established treatment in patients with multifocal motor neuropathy (MMN), and many patients have an IVIg-dependent fluctuation. We aimed to investigate the efficacy and safety of every 3 week IVIg (1.0 g/kg) for 52 weeks. This study was an open-label phase 3 clinical trial, enrolling 13 MMN patients. After an induction IVIg therapy (0.4 g/kg/d for 5 consecutive days), maintenance dose (1.0 g/kg) was given every 3 weeks for 52 weeks. The major outcome measures were the Medical Research Council (MRC) sum score and hand-grip strength at week 52. This trial is registered with ClinicalTrials.gov, number NCT01827072. At week 52, 11 of the 13 patients completed the study, and all 11 had a sustained improvement. The mean (SD) MRC sum score was 85.6 (8.7) at the baseline, and 90.6 (12.8) at week 52. The mean grip strength was 39.2 (30.0) kPa at the baseline and 45.2 (32.8) kPa at week 52. Two patients dropped out because of adverse event (dysphagia) and decision of an investigator, respectively. Three patients developed coronary spasm, dysphagia, or inguinal herniation, reported as the serious adverse events, but considered not related with the study drug. The other adverse effects were mild and resolved by the end of the study period. Our results show that maintenance treatment with 1.0 g/kg IVIg every 3 week is safe and efficacious for MMN patients up to 52 weeks. Further studies are required to investigate optimal dose and duration of maintenance IVIg for MMN. © 2018 The Authors. Journal of the Peripheral Nervous System published by Wiley Periodicals, Inc. on behalf of Peripheral Nerve Society.

  11. Point Lepreau refurbishment project programmable digital comparator (PDC) replacement for SDS1 and SDS2

    International Nuclear Information System (INIS)

    Ichiyen, N.M.; Chan, D.; Thompson, P.D.

    2003-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) starting in April 2007. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the PDCs (Programmable Digital Comparators) for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the activities that have taken place in the Phase 2 ESA program as well as the plan for future work for the PDC replacement for SDS 1 (Shutdown System Number One) and SDS2 (Shutdown System Number Two). (author)

  12. Olfactory short-term memory encoding and maintenance - an event-related potential study.

    Science.gov (United States)

    Lenk, Steffen; Bluschke, Annet; Beste, Christian; Iannilli, Emilia; Rößner, Veit; Hummel, Thomas; Bender, Stephan

    2014-09-01

    This study examined whether the memory encoding and short term maintenance of olfactory stimuli is associated with neurophysiological activation patterns which parallel those described for sensory modalities such as vision and auditory. We examined olfactory event-related potentials in an olfactory change detection task in twenty-four healthy adults and compared the measured activation to that found during passive olfactory stimulation. During the early olfactory post-processing phase, we found a sustained negativity over bilateral frontotemporal areas in the passive perception condition which was enhanced in the active memory task. There was no significant lateralization in either experimental condition. During the maintenance interval at the end of the delay period, we still found sustained activation over bilateral frontotemporal areas which was more negative in trials with correct - as compared to incorrect - behavioural responses. This was complemented by a general significantly stronger frontocentral activation. Summarizing, we were able to show that olfactory short term memory involves a parallel sequence of activation as found in other sensory modalities. In addition to olfactory-specific frontotemporal activations in the memory encoding phase, we found slow cortical potentials over frontocentral areas during the memory maintenance phase indicating the activation of a supramodal memory maintenance system. These findings could represent the neurophysiological underpinning of the 'olfactory flacon', the olfactory counter-part to the visual sketchpad and phonological loop embedded in Baddeley's working memory model. Copyright © 2014 Elsevier Inc. All rights reserved.

  13. Shuttle Repair Tools Automate Vehicle Maintenance

    Science.gov (United States)

    2013-01-01

    Successfully building, flying, and maintaining the space shuttles was an immensely complex job that required a high level of detailed, precise engineering. After each shuttle landed, it entered a maintenance, repair, and overhaul (MRO) phase. Each system was thoroughly checked and tested, and worn or damaged parts replaced, before the shuttle was rolled out for its next mission. During the MRO period, workers needed to record exactly what needed replacing and why, as well as follow precise guidelines and procedures in making their repairs. That meant traceability, and with it lots of paperwork. In 2007, the number of reports generated during electrical system repairs was getting out of hand-placing among the top three systems in terms of paperwork volume. Repair specialists at Kennedy Space Center were unhappy spending so much time at a desk and so little time actually working on the shuttle. "Engineers weren't spending their time doing technical work," says Joseph Schuh, an electrical engineer at Kennedy. "Instead, they were busy with repetitive, time-consuming processes that, while important in their own right, provided a low return on time invested." The strain of such inefficiency was bad enough that slow electrical repairs jeopardized rollout on several occasions. Knowing there had to be a way to streamline operations, Kennedy asked Martin Belson, a project manager with 30 years experience as an aerospace contractor, to co-lead a team in developing software that would reduce the effort required to document shuttle repairs. The result was System Maintenance Automated Repair Tasks (SMART) software. SMART is a tool for aggregating and applying information on every aspect of repairs, from procedures and instructions to a vehicle s troubleshooting history. Drawing on that data, SMART largely automates the processes of generating repair instructions and post-repair paperwork. In the case of the space shuttle, this meant that SMART had 30 years worth of operations

  14. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  15. JSS project phase 4: Experimental and modelling studies of HLW glass dissolution in repository environments

    International Nuclear Information System (INIS)

    1987-10-01

    A goal of the JSS project was to develop a scientific basis for understanding the effects of waste package components, groundwater chemistry, and other repository conditions on glass dissolution behaviour, and to develop and refine a model for the processes governing glass dissolution. The fourth phase of the project, which was performed by the Hahn-Meitner-Institut, Berlin, FRG, dealt specifically with model development and application. Phase 4 also adressed whether basaltic glasses could serve as natural analogues for nuclear waste glasses, thus providing a means to test the capability of the model for long-term predictions. Additional experiments were performed in order to complete the data base necessary to model interactions between the glass and bentonite and between glass and steel corrosion products. More data on temperature, S/V, and pH dependence of the glass/water reaction were also collected. In this report, the data acquired during phase 4 are presented and discussed. (orig./DG)

  16. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  17. Sustainable development in city districts: BaLaLuZ project - Gundeldinger Feld - Phase 1; Schlussbericht Quartier Gundeldingerfeld Basel - Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Binz, A.; Voyame, J.-P.

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the first phase of the project in Gundeldinger Feld, Basel. In an analysis of the initial situation in the Gundeldinger Feld, ecological and economical aspects are examined as are questions concerning mobility and urban planning. The various players involved are introduced and their expectations reviewed; work done and the involvement of the local inhabitants in the project are looked at. Measures to be taken to realise the visions proposed are discussed and suggestions for projects are made.

  18. Reliability and risk treatment centered maintenance

    International Nuclear Information System (INIS)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr; Havlu, Vit

    2014-01-01

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  19. Reliability and risk treatment centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr [Czech University of Life Sciences Prague, Kamycka (Czech Republic); Havlu, Vit [Unipetrol A. S, Prague (Czech Republic)

    2014-10-15

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  20. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  1. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  2. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  3. Cyprus natural analogue project (CNAP). Phase III final report

    International Nuclear Information System (INIS)

    Alexander, W.R.; Milodowski, A.E.; Pitty, A.F.

    2012-01-01

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10 5 a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  4. Cyprus natural analogue project (CNAP). Phase III final report

    Energy Technology Data Exchange (ETDEWEB)

    Alexander, W R [Bedrock Geosciences, Auenstein (Switzerland); Milodowski, A E [British Geological Survey, Keyworth (United Kingdom); Pitty, A F [Pitty (EIA) Consulting, Norwich (United Kingdom)

    2012-01-15

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10{sup 5} a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  5. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project (Translated document)

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Onoe, Hironori; Sato, Toshinori; Yasue, Kenichi; Asamori, Koichi; Niwa, Masakazu; Osawa, Hideaki; Nagae, Isako; Natsuyama, Ryoko; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Takeda, Masaki; Aoyagi, Kazuhei; Nakayama, Masashi; Miyakawa, Kazuya; Ito, Hiroaki; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2016-08-01

    We have synthesized the research results from the Mizunami/Horonobe Underground Research Laboratories (URLs) and geo-stability projects in the second mid-term research phase. This report can be used as a technical basis for the Nuclear Waste Management Organization of Japan/Regulator at each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High-quality construction techniques and field investigation methods have been developed and implemented, which will be directly applicable to the National Disposal Program (together with general assessments of hazardous natural events and processes). Acquisition of technical knowledge on decisions of partial backfilling and final closure from actual field experiments in the Mizunami/Horonobe URLs will be crucial as the main theme for the next phases. (author)

  6. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme

    International Nuclear Information System (INIS)

    Sainero Garcia, J.

    1993-01-01

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  7. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  8. Ultrasonic Communication Project, Phase 1, FY1999

    Energy Technology Data Exchange (ETDEWEB)

    Haynes, H.D.; Akerman, M.A.; Baylor, V.M.

    2000-06-01

    This Phase 1 project has been successful in identifying, exploring, and demonstrating methods for ultrasonic-based communication with an emphasis on the application of digital signal processing techniques. During the project, at the direction of the agency project monitor, particular attention was directed at sending and receiving ultrasonic data through air and through pipes that would be commonly found in buildings. Efforts were also focused on development of a method for transmitting computer files ultrasonically. New methods were identified and evaluated for ultrasonic communication. These methods are based on a technique called DFS. With DFS, individual alphanumeric characters are broken down into a sequence of bits, and each bit is used to generate a discrete ultrasonic frequency. Characters are then transmitted one-bit-at-a-time, and reconstructed by the receiver. This technique was put into practice through the development of LabVIEW{trademark}VIs. These VIs were integrated with specially developed electronic circuits to provide a system for demonstrating the transmission and reception/reconstruction of typed messages and computer files. Tests were performed to determine the envelope for ultrasound transmission through pipes (with and without water) versus through air. The practical aspects of connections, efficient electronics, impedance matching, and the effect of damping mechanisms were all investigated. These tests resulted in a considerable number of reference charts that illustrate the absorption of ultrasound through different pipe materials, both with and without water, as a function of distance. Ultrasound was found to be least attenuated by copper pipe and most attenuated by PVC pipe. Water in the pipe provides additional damping and attenuation of ultrasonic signals. Dramatic improvements are observed, however, in ultrasound signal strength if the transducers are directly coupled to the water, rather than simply attaching them to the outside of

  9. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  10. Horonobe Underground Research Laboratory project. Synthesis of phase I investigation 2001-2005. Volume 'geoscientific research'

    International Nuclear Information System (INIS)

    Ota, Kunio; Abe, Hironobu; Kunimaru, Takanori

    2011-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe in Hokkaido, northern Japan. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The present report summarises the results of the Phase I geoscientific research carried out from March 2001 to March 2005. Integration of the results from different disciplines ensures that the Phase I goals have been successfully achieved and identifies key issues that need to be addressed in Phases II and III. More importantly, efforts are made to summarise as many lessons learnt from the Phase I investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. Based on experiences of selecting the URL area and site in Horonobe Town, important factors that should be taken into consideration in such selection processes and their rationale are demonstrated. In the course of stepwise surface-based investigations, a number of achievements have been made, which can eventually provide examples of integrated methodologies for characterising the sedimentary formations. The relevant surface-based investigation techniques have thus been further developed. The Horonobe URL has been designed based on geoscientific information accumulated during the surface-based investigations and the plans for safe construction and operation of the URL have been defined in a feasible manner. In addition, a variety of environmental measures taken during Phase I have proved to be

  11. Catalyst activity maintenance study for the liquid phase dimethyl ether process

    Energy Technology Data Exchange (ETDEWEB)

    Peng, X.D.; Toseland, B.A.; Underwood, R.P. [Air Products and Chemicals, Inc., Allentown, PA (United States)

    1995-12-31

    The co-production of dimethyl ether (DME) and methanol from syngas is a process of considerable commercial attractiveness. DME coproduction can double the productivity of a LPMEOH process when using coal-derived syngas. This in itself may offer chemical producers and power companies increased flexibility and more profitable operation. DME is also known as a clean burning liquid fuel; Amoco and Haldor-Topsoe have recently announced the use of DME as an alternative diesel fuel. Moreover, DME can be an interesting intermediate in the production of chemicals such as olefins and vinyl acetate. The current APCl liquid phase dimethyl ether (LPDME) process utilizes a physical mixture of a commercial methanol synthesis catalyst and a dehydration catalyst (e.g., {gamma}-alumina). While this arrangement provides a synergy that results in much higher syngas conversion per pass compared to the methanol-only process, the stability of the catalyst system suffers. The present project is aimed at reducing catalyst deactivation both by understanding the cause(s) of catalyst deactivation and by developing modified catalyst systems. This paper describes the current understanding of the deactivation mechanism.

  12. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  13. OC5 Project Phase II: Validation of Global Loads of the DeepCwind Floating Semisubmersible Wind Turbine

    DEFF Research Database (Denmark)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    2017-01-01

    This paper summarizes the findings from Phase II of the Offshore Code Comparison, Collaboration, Continued, with Correlation project. The project is run under the International Energy Agency Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems thro...

  14. Condition Based Maintenance of Space Exploration Vehicles Using Structural Health Monitoring, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies proposes to develop an autonomous and automated diagnostic system for condition based maintenance (CBM) of safety critical structures for space...

  15. I. Final Report for DOE SBIR Phase I Project DE-SC0013795 Final Report for DOE SBIR Phase I Project DE-SC0013795 Microtron-based Compact, Portable Gamma-Ray Source

    Energy Technology Data Exchange (ETDEWEB)

    Abrams, Robert J. [Muons Inc., Batavia, IL (United States)

    2017-01-09

    Microtron-based Compact, Portable Gamma-Ray Source. The objective of Phase I of this project was to produce a conceptual design of a prototype compact microtron electron accelerator, which could be designed, built, and demonstrated in Phase II of the project. The conceptual design study included an analysis of the parameters of the microtron and its components, and the expected performance of the prototype microtron as a source of x-rays and/or RF neutrons in the MeV energy range. The major components of the microtron are the magnet, the accelerating system, the power system, the vacuum system, the control system, the beam extraction system and the targets to produce x-rays (and/or neutrons). Our objectives for the design of the prototype were for it to be compact, cost-effective, capable of producing high intensity x-ray (an/or neutron) fluxes. In addition, the prototype was to be easily assembled and disassembled so that components could be easily replaced. The main parameters for the prototype are the following: the range of electron kinetic energies, the output power, the RF frequency band (X-band, C-band, or S-Band), the type of injection (Type I or Type II), the magnet type, i.e. permanent magnet, electromagnet, or a hybrid combination of permanent and electromagnet. The results of the Phase I study and analysis for a prototype microtron are the following: The electron energy range can be varied from below 6 MeV to 9 MeV, the optimal frequency range is S-Band (2-4 GHz) RF frequency, Type II injection (described below), and the magnet type is the hybrid version. The prototype version will be capable of producing gamma ray doses of ~1800 R/min-m and neutron fluxes of up to ~6 x 1010 n/s with appropriate targets. The results of the Phase I study and analysis are provided below. The proposed Phase II plan was to demonstrate the prototype at low beam power. In the subsequent Phase III, high power tests would be performed, and the design of commercial

  16. Just In-Time Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    DR. Alexander G. Parlos

    2002-01-22

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost.

  17. Just In-Time Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Parlos, Alexander G.

    2002-01-01

    The goal of this project has been to develop and demonstrate the feasibility of a new technology for maintenance engineering: a Just-In-Time Maintenance (JITM) system for rotating machines. The JITM system is based on several key developments at Texas A and M over the past ten years in emerging intelligent information technologies, which if integrated into a single system could provide a revolutionary approach in the way maintenance is performed. Rotating machines, such as induction motors, range from a few horse power (hp) to several thousand hp in size, and they are widely used in nuclear power plants and in other industries. Forced outages caused by induction motor failures are the reason for as much as 15% - 40% of production costs to be attributable to maintenance, whereas plant shutdowns caused by induction motor failures result in daily financial losses to the utility and process industries of $1 M or more. The basic components of the JITM system are the available machine sensors, that is electric current sensors and accelerometers, and the computational algorithms used in the analysis and interpretation of the occurring incipient failures. The JITM system can reduce the costs attributable to maintenance by about 40% and it can lower the maintenance budgets of power and process plants by about 35%, while requiring no additional sensor installation. As a result, the JITM system can improve the competitiveness of US nuclear utilities at minimal additional cost

  18. Availability program: Phase I report

    International Nuclear Information System (INIS)

    Thomson, S.L.; Dabiri, A.; Keeton, D.C.; Riemer, B.W.; Waganer, L.M.

    1985-05-01

    An Availability Working Group was formed within the Office of Fusion Energy in March 1984 to consider the establishment of an availability program for magnetic fusion. The scope of this program is defined to include the development of (1) a comprehensive data base, (2) empirical correlations, and (3) analytical methods for application to fusion facilities and devices. The long-term goal of the availability program is to develop a validated, integrated methodology that will provide (1) projections of plant availability and (2) input to design decisions on maintainability and system reliability requirements. The Phase I study group was commissioned to assess the status of work in progress that is relevant to the availability program. The scope of Phase I included surveys of existing data and data collection programs at operating fusion research facilities, the assessment of existing computer models to calculate system availability, and the review of methods to predict and correlate data on component failure and maintenance. The results of these investigations are reported to the Availability Working Group in this document

  19. The Convergence of Heat, Groundwater & Fracture Permeability. Innovative Play Fairway Modelling Applied to the Tularosa Basin Phase 1 Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Carlon R. [Ruby Mountain Inc., Salt Lake City, UT (United States); Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Sorkhabi, Rasoul [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Brandt, Adam [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Barker, Benjamin [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Swanson, Brigitte [Ruby Mountain Inc., Salt Lake City, UT (United States)

    2015-10-16

    This report summarizes the activities and key findings of the project team occurring during Phase 1 (August 2014-October 2015) of the Tularosa Basin Geothermal Play Fairway Analysis Project. The Tularosa Basin Play Fairway Analysis (PFA) project tested two distinct geothermal exploration methodologies covering the entire basin within South Central New Mexico and Far West Texas. Throughout the initial phase of the project, the underexplored basin proved to be a challenging, yet ideal test bed to evaluate effectiveness of the team’s data collection techniques as well as the effectiveness of our innovative PFA. Phase 1 of the effort employed a low-cost, pragmatic approach using two methods to identify potential geothermal plays within the study area and then compared and contrasted the results of each method to rank and evaluate potential plays. Both methods appear to be very effective and highly transferable to other areas.

  20. A decision support system for the maintenance of lights of traffic regulation systems

    NARCIS (Netherlands)

    Duyn Schouten, F.A. van der; Klusener, A.S.; Vlijmen, S.F.M. van; Vos de Wael, S.L.E.

    From October 1994 to June 1995 the authors executed a project, the so called 'Lampremplace' project, in cooperation with Nederland Haarlem, a Dutch constructor and supplier of traffic regulation systems. 'Lampremplace', as it is called in traffic jargon, is the maintenance of lights of traffic

  1. Trimode optimizes hybrid power plants. Final report: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    O`Sullivan, G.A.; O`Sullivan, J.A. [Abacus Controls, Inc., Somerville, NJ (United States)

    1998-07-01

    In the Phase 2 project, Abacus Controls Inc. did research and development of hybrid systems that combine the energy sources from photovoltaics, batteries, and diesel-generators and demonstrated that they are economically feasible for small power plants in many parts of the world. The Trimode Power Processor reduces the fuel consumption of the diesel-generator to its minimum by presenting itself as the perfect electrical load to the generator. A 30-kW three-phase unit was tested at Sandia National Laboratories to prove its worthiness in actual field conditions. The use of photovoltaics at remote locations where reliability of supply requires a diesel-generator will lower costs to operate by reducing the run time of the diesel generator. The numerous benefits include longer times between maintenance for the diesel engine and better power quality from the generator. 32 figs.

  2. Final waste forms project: Performance criteria for phase I treatability studies

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Hutchins, D.A.; Chodak, P. III

    1994-06-01

    This document defines the product performance criteria to be used in Phase I of the Final Waste Forms Project. In Phase I, treatability studies will be performed to provide open-quotes proof-of-principleclose quotes data to establish the viability of stabilization/solidification (S/S) technologies. This information is required by March 1995. In Phase II, further treatability studies, some at the pilot scale, will be performed to provide sufficient data to allow treatment alternatives identified in Phase I to be more fully developed and evaluated, as well as to reduce performance uncertainties for those methods chosen to treat a specific waste. Three main factors influence the development and selection of an optimum waste form formulation and hence affect selection of performance criteria. These factors are regulatory, process-specific, and site-specific waste form standards or requirements. Clearly, the optimum waste form formulation will require consideration of performance criteria constraints from each of the three categories. Phase I will focus only on the regulatory criteria. These criteria may be considered the minimum criteria for an acceptable waste form. In other words, a S/S technology is considered viable only if it meet applicable regulatory criteria. The criteria to be utilized in the Phase I treatability studies were primarily taken from Environmental Protection Agency regulations addressed in 40 CFR 260 through 265 and 268; and Nuclear Regulatory Commission regulations addressed in 10 CFR 61. Thus the majority of the identified criteria are independent of waste form matrix composition (i.e., applicable to cement, glass, organic binders etc.)

  3. Final waste forms project: Performance criteria for phase I treatability studies

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M. [Oak Ridge National Lab., TN (United States); Hutchins, D.A. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States); Chodak, P. III [Massachusetts Institute of Technology (United States)

    1994-06-01

    This document defines the product performance criteria to be used in Phase I of the Final Waste Forms Project. In Phase I, treatability studies will be performed to provide {open_quotes}proof-of-principle{close_quotes} data to establish the viability of stabilization/solidification (S/S) technologies. This information is required by March 1995. In Phase II, further treatability studies, some at the pilot scale, will be performed to provide sufficient data to allow treatment alternatives identified in Phase I to be more fully developed and evaluated, as well as to reduce performance uncertainties for those methods chosen to treat a specific waste. Three main factors influence the development and selection of an optimum waste form formulation and hence affect selection of performance criteria. These factors are regulatory, process-specific, and site-specific waste form standards or requirements. Clearly, the optimum waste form formulation will require consideration of performance criteria constraints from each of the three categories. Phase I will focus only on the regulatory criteria. These criteria may be considered the minimum criteria for an acceptable waste form. In other words, a S/S technology is considered viable only if it meet applicable regulatory criteria. The criteria to be utilized in the Phase I treatability studies were primarily taken from Environmental Protection Agency regulations addressed in 40 CFR 260 through 265 and 268; and Nuclear Regulatory Commission regulations addressed in 10 CFR 61. Thus the majority of the identified criteria are independent of waste form matrix composition (i.e., applicable to cement, glass, organic binders etc.).

  4. Evaluation and Selection of Renewable Energy Technologies for Highway Maintenance Facilities

    Science.gov (United States)

    Andrews, Taylor

    The interest in renewable energy has been increasing in recent years as attempts to reduce energy costs as well the consumption of fossil fuels are becoming more common. Companies and organizations are recognizing the increasing reliance on limited fossil fuels' resources, and as competition and costs for these resources grow, alternative solutions are becoming more appealing. Many federally run buildings and associations also have the added pressure of meeting the mandates of federal energy policies that dictate specific savings or reductions. Federal highway maintenance facilities run by the Department of Transportation fall into this category. To help meet energy saving goals, an investigation into potential renewable energy technologies was completed for the Ohio Department of Transportation. This research examined several types of renewable energy technologies and the major factors that affect their performance and evaluated their potential for implementation at highway maintenance facilities. Facilities energy usage data were provided, and a facility survey and site visits were completed to enhance the evaluation of technologies and the suitability for specific projects. Findings and technology recommendations were presented in the form of selection matrices, which were designed to help make selections in future projects. The benefits of utilization of other tools such as analysis software and life cycle assessments were also highlighted. These selection tools were designed to be helpful guides when beginning the pursuit of a renewable energy technology for highway maintenance facilities, and can be applied to other similar building types and projects. This document further discusses the research strategies and findings as well as the recommendations that were made to the personnel overseeing Ohio's highway maintenance facilities.

  5. The Age-ility Project (Phase 1): Structural and functional imaging and electrophysiological data repository

    NARCIS (Netherlands)

    Karayanidis, F.; Keuken, M.C.; Wong, A.; Rennie, J.L.; de Hollander, G.; Cooper, P.S.; Fulham, W.R.; Lenroot, R.; Parsons, M.; Philips, N.; Michie, P.T.; Forstmann, B.U.

    2015-01-01

    Our understanding of the complex interplay between structural and functional organisation of brain networks is being advanced by the development of novel multi-modal analyses approaches. The Age-ility Project (Phase 1) data repository offers open access to structural MRI, diffusion MRI, and

  6. Strategy for success in maintenance management at Point Lepreau nuclear generating station

    International Nuclear Information System (INIS)

    White, R.M.

    1987-01-01

    Improvements in availability of the station and in productivity of workers were achieved at Point Lepreau Nuclear Generating Station through implementation of a Maintenance Management System, which incorporates work planning and outage management techniques. Eight software systems on a VAX 11/70 minicomputer control work orders, temporary and permanent design changes, parts and material inventories, time keeping, and project management. All maintenance is coordinated through a regular planning meeting

  7. ERC Maintenance Implementation Plan for nuclear facilities

    International Nuclear Information System (INIS)

    Franquero, R.C.

    1997-05-01

    The inactive and surplus facilities assigned to the Environmental Restoration Contractor are shut down and have no operating production processes or production materials except for residual contamination. There is a minimal number of operating systems to support surveillance and maintenance or decontamination and decommissioning activities (D ampersand D). These systems may include heating and ventilation, air conditioning, lighting, and other electrical systems. Inactive and surplus facilities will be subject to periodic long-term surveillance to ensure the integrity of structures until D ampersand D. D ampersand D projects are of relatively short duration and end with all systems deactivated. Therefore, a rigorous in-depth maintenance program such as that required for producing nuclear facilities is not required or cost effective

  8. SWOT Analysis of Urban Greening Maintenance and Management in the Central Pearl River Delta

    Institute of Scientific and Technical Information of China (English)

    Yanning; ZHENG; Fang; JIANG

    2013-01-01

    We take Shunde District,Foshan City in Guangdong Province for example,to carry out SWOT analysis of urban greening maintenance and management.The strengths of greening management and maintenance in Shunde District are as follows:(i)The greening area and quality are continuously improved in the downtown of Shunde District;(ii)The management and maintenance work is carried out well;(iii)The management and maintenance level tends to be increasingly perfected.The weaknesses of greening management and maintenance are as follows:(i)The fees for greening management and maintenance are very low;(ii)There is corner as yet untouched in the junction of some town streets;(iii)The greening management and maintenance technicians are unprofessional;(iv)The greening management is not in place;(v)There is management vacancy phenomenon in the management and maintenance of regional green space;(vi)The design and construction phase is flawed.Finally,based on the analysis of strengths and weaknesses of greening,we put forth the recommendations for the development of management and maintenance in urban green space.

  9. Materials Information for Science and Technology (MIST): Project overview: Phase 1 and 2 and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-11-01

    The National Bureau of Standards and the Department of Energy have embarked on a program to build a demonstration computerized materials data system called Materials Information for Science and Technology (MIST). This report documents the first two phases of the project. The emphasis of the first phase was on determining what information was needed and how it could impact user productivity. The second phase data from the Aerospace Metal Handbook on a set of alloys was digitized and incorporated in the system.

  10. Expert system for maintenance management of a boiling water reactor power plant

    International Nuclear Information System (INIS)

    Hong Shen; Liou, L.W.; Levine, S.; Ray, A.; Detamore, M.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, which must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components

  11. Maintenance methods: Development, Trends and Recommendations[M]; Underhaallsmetoder: Utveckling, Trender och Rekommendationer

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Johan; Sonden, Mikael; Haegg, Maria; Johansson, Bernt Aake; Johansson, Mikael; Aagren, Karoline; Gunnarsson, Haakan; Sandin, Paer

    2006-12-15

    Vaermeforsk has an ambition to map the maintenance management area to improve its decision support to plant owners and increase the level of knowledge in the energy sector. Thus, Inspecta Technology, Fortum and Systecon have been given the task to perform a project with the expressed objectives to: describe the general knowledge level in other sectors of the industry and how the use of improvement methods contributes to the plant reliability; illustrate and recommend improvement methods applicable in the energy industry; and to identify further need for development and make priorities. The project is performed in three steps. The first consists of an inventory of existing methods and strategies. The starting point has been the typical problems you face in the maintenance field. It turns out that there are numerous examples of successful approaches used in other sectors of industry. The next step is an enquiry to describe current status in the energy sector. 21 plants were included in this study and it points out a need both for specific analysis methods and more general strategies for maintenance management. The result from both inventory and enquiry forms the base for development of the guide. The guide is structured from the identified problem areas but also from a notional maintenance process. To improve the basis for Vaermeforsk's priorities, a number of possible development areas are proposed, such as the development of standard performance indicators, pilot projects to emphasize the use of analytical methods and in some cases further development of methods for use within the energy sector.

  12. Maintenance methods: Development, Trends and Recommendations[M]; Underhaallsmetoder: Utveckling, Trender och Rekommendationer

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Johan; Sonden, Mikael; Haegg, Maria; Johansson, Bernt Aake; Johansson, Mikael; Aagren, Karoline; Gunnarsson, Haakan; Sandin, Paer

    2006-12-15

    Vaermeforsk has an ambition to map the maintenance management area to improve its decision support to plant owners and increase the level of knowledge in the energy sector. Thus, Inspecta Technology, Fortum and Systecon have been given the task to perform a project with the expressed objectives to: describe the general knowledge level in other sectors of the industry and how the use of improvement methods contributes to the plant reliability; illustrate and recommend improvement methods applicable in the energy industry; and to identify further need for development and make priorities. The project is performed in three steps. The first consists of an inventory of existing methods and strategies. The starting point has been the typical problems you face in the maintenance field. It turns out that there are numerous examples of successful approaches used in other sectors of industry. The next step is an enquiry to describe current status in the energy sector. 21 plants were included in this study and it points out a need both for specific analysis methods and more general strategies for maintenance management. The result from both inventory and enquiry forms the base for development of the guide. The guide is structured from the identified problem areas but also from a notional maintenance process. To improve the basis for Vaermeforsk's priorities, a number of possible development areas are proposed, such as the development of standard performance indicators, pilot projects to emphasize the use of analytical methods and in some cases further development of methods for use within the energy sector.

  13. An intelligent tele-healthcare environment offering person-centric and wellness-maintenance services.

    Science.gov (United States)

    Abidi, S S

    2001-06-01

    Worldwide healthcare delivery trends are undergoing a subtle paradigm shift--patient centered services as opposed to provider centered services and wellness maintenance as opposed to illness management. In this paper we present a Tele-Healthcare project TIDE--Tele-Healthcare Information and Diagnostic Environment. TIDE manifests an 'intelligent' healthcare environment that aims to ensure lifelong coverage of person-specific health maintenance decision-support services--i.e., both wellness maintenance and illness management services--ubiquitously available via the Internet/WWW. Taking on an all-encompassing health maintenance role--spanning from wellness to illness issues--the functionality of TIDE involves the generation and delivery of (a) Personalized, Pro-active, Persistent, Perpetual, and Present wellness maintenance services, and (b) remote diagnostic services for managing noncritical illnesses. Technically, TIDE is an amalgamation of diverse computer technologies--Artificial Intelligence, Internet, Multimedia, Databases, and Medical Informatics--to implement a sophisticated healthcare delivery infostructure.

  14. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    Energy Technology Data Exchange (ETDEWEB)

    Whaley, Cass [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  15. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  16. Reactor installation and maintenance for the Advanced Neutron Source

    International Nuclear Information System (INIS)

    Smith, B.R.

    1993-01-01

    Advanced Neutron Source (ANS) reactor assembly components have been modeled in great detail in IGRIP in order to realistically simulate preliminary installation and maintenance processes. Animation of these processes has been captured in a 15-minute video with narration. Approximately 90% of the parts were initially translated from CADAM (a two-dimensional drawing package) to IGRIP and then revolved or extruded. IGRIP's IGES translator greatly reduced the time required to perform this operation. The interfacing of devices in the work cell has identified numerous design inconsistencies. Most of the modeled reactor components are devices with a single degree of freedom (DOF) however, some of the slanted experiments required 6 DOF so that they could be removed at an angle in order to clear the reflector vessel flanges. IGRIP's collision detection feature proved to be extremely helpful in determining interferences when removing the experiments. The combination of three-dimensional visualization and collision detection allows engineers to clearly and easily visualize potential design problems before the construction phase of the project

  17. Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, Karl

    2012-11-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work

  18. Kaunas gas, Lithuania. Operation and maintenance report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The main objective of this project was to transfer knowledge accumulated in Denmark about modern techniques of natural gas distribution to employees of the Lithuanian gas sector by informing them about modern measuring equipment and evaluating the results. The main objectives were: To improve the efficiency of maintenance and repair works of the distribution network in Kaunas; To decrease the number of leakages and to improve the operation of the cathodic protection system; To ensure protection of the pipelines and to avoid damages on other constructions and installations. The project consisted of four components which will all exert an influence on the future rehabilitation of steel pipe networks in the gas sector of Lithuania. The components were the following: Preparation of Operation and Maintenance Manual for Kaunas Gas Company; Cathodic measuring and pilot investigation; Analysis and improvement of the organisation of the Kaunas Gas Company; Training material for cathodic protection in Lithaunia. (au)

  19. China prices up, ahead of major rail maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-03-15

    An update is given in China's coal industry. IN a move to keep more of its coal in China, a coal export quota of 38 mt has been set-up. Part. time closure of the Daqin railway line for maintenance is affecting prices. Development projects and mine safety are discussed. 1 photo.

  20. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  1. Implementing a customer focused continual business improvement program to improve the maintenance process

    International Nuclear Information System (INIS)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M.

    2006-01-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  2. Implementing a customer focused continual business improvement program to improve the maintenance process

    Energy Technology Data Exchange (ETDEWEB)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2006-07-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  3. Gamma-ray CT from incomplete projections for two-phase pipe flow.

    Science.gov (United States)

    Xin, S; Wang, H X

    2017-02-01

    A low-energy low-dose γ-ray computed tomography (CT) system used in the gas-liquid two-phase pipe flow measurement has been studied at Tianjin University in recent years. The γ-ray CT system, having a third-generation X-ray CT scanning configuration, is comprised of one 300mCi 241 Am source and 17 CdZnTe detector units and achieves a spatial image resolution of about 7 mm. It is primarily intended to measure the two-phase pipe flow and provide improvement suggestions for industrial CT system. Recently we improve the design for image reconstruction from incomplete projection to optimize the scanning parameters and reduce the radiation dose. First, tomographic problem from incomplete projections is briefly described. Next, a system structure and a hardware circuit design are listed and explained, especially on time parameter setting of the pulse shaper. And then a detailed system analysis is provided in Section II, mainly focusing on spatial resolution, temporal resolution, system noise, and imaging algorithm. Finally, we carry on necessary static and dynamic experiments in a full scan (360°) and two sets of partial scan reconstruction tests to determine the feasibility of this γ-ray CT system for reconstructing the images from insufficient projections. And based on an A-variable algebraic reconstruction technique method, a specially designed algorithm, we evaluate the system performance and noise level of this CT system working quantitatively and qualitatively. Results of dynamic test indicate that the acceptable results can be acquired using a multi-source γ-ray CT system with the same parameters when the flow rate is less than 0.04 m/s and the imaging speed is slower than 33 frames/s.

  4. Integrated fuzzy analytic hierarchy process and VIKOR method in the prioritization of pavement maintenance activities

    Directory of Open Access Journals (Sweden)

    Peyman Babashamsi

    2016-03-01

    Full Text Available Maintenance activities and pavement rehabilitation require the allocation of massive finances. Yet due to budget shortfalls, stakeholders and decision-makers must prioritize projects in maintenance and rehabilitation. This article addresses the prioritization of pavement maintenance alternatives by integrating the fuzzy analytic hierarchy process (AHP with the VIKOR method (which stands for ‘VlseKriterijumska Optimizacija I Kompromisno Resenje,’ meaning multi-criteria optimization and compromise solution for the process of multi-criteria decision analysis (MCDA by considering various pavement network indices. The indices selected include the pavement condition index (PCI, traffic congestion, pavement width, improvement and maintenance costs, and the time required to operate. In order to determine the weights of the indices, the fuzzy AHP is used. Subsequently, the alternatives’ priorities are ranked according to the indices weighted with the VIKOR model. The choice of these two independent methods was motivated by the fact that integrating fuzzy AHP with the VIKOR model can assist decision makers with solving MCDA problems. The case study was conducted on a pavement network within the same particular region in Tehran; three main streets were chosen that have an empirically higher maintenance demand. The most significant factors were evaluated and the project with the highest priority was selected for urgent maintenance. By comparing the index values of the alternative priorities, Delavaran Blvd. was revealed to have higher priority over the other streets in terms of maintenance and rehabilitation activities. Keywords: Maintenance and rehabilitation prioritization, Fuzzy analysis hierarchy process, VIKOR model, Pavement condition index, Multi-criteria decision analysis

  5. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  6. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  7. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    International Nuclear Information System (INIS)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M.

    2008-01-01

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs

  8. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    Energy Technology Data Exchange (ETDEWEB)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M. [Sakhalin Energy, Moscow (Russian Federation)

    2008-09-15

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs.

  9. Maintenance of buildings: Italian examples of deviations between planned and incurred costs

    Science.gov (United States)

    Rebaudengo, Manuela; Piantanida, Paolo

    2018-05-01

    In recent years, drawing up the maintenance plan for a building has proved to be a theoretical practice, which has been expressed in the indication of a multiplicity of interventions more for caution reasons than for real needs. In this way, the document (mandatory by the Italian law both for public and private works) has been interpreted as a formal requirement: it must be part of the project, without any particular operational interest. So, the maintenance plans are more often "standard plans", not directing the user towards a specific maintenance strategy and thus consolidating the common thesis that reality is different. The paper compares, with reference to two xxx of study (offices and residence), the planned maintenance actions and those carried out, with an indication of the difference between expected and incurred costs.

  10. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  11. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  12. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  13. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    Energy Technology Data Exchange (ETDEWEB)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  14. Data requirements and maintenance of records for spent fuel management: A review

    International Nuclear Information System (INIS)

    2006-11-01

    Data collection and maintenance are an essential part of activities required in the lifetime management of spent fuel. Key data on spent fuel are required from the earliest phase of any project. To allow informed decisions for spent fuel management to be made, the data need to be maintained throughout the lifetime of spent fuel management including storage, transport, reprocessing or disposal. This publication is intended to provide a state-of-the-art review of spent fuel data management, including what data need to be gathered for the relevant activities in spent fuel management and how to maintain them by the responsible bodies at various stages of the nuclear fuel cycle. It provides some insights on a rational approach to spent fuel data management, considering the common requirements involved in spent fuel management for any Member State. In this regard, the information provided in these sections is mostly generic. After the introductory Section 1 and the Section 2 on data requirements for spent fuel management, Section 3 examines technical parameters that could specify spent fuel characteristics and associated conditions, followed by Section 4 on life cycle management of spent fuel data which includes the maintenance of records and other issues. Finally, some specific examples of the approaches already developed by a number of utilities and national organisations to characterise and track their spent-fuel data are presented in the Annex

  15. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  16. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  17. Sustainable development in city districts: BaLaLuZ project - Bellevaux Phase 2; Quartiers durables BaLaLuZh. Rapport Lausanne-Bellevaux. Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, D; Nicol, L [Swiss Federal Institute of Technology (EPFL), Laboratoire d' energie solaire et de physique du batiment (LESO-PB), Lausanne (Switzerland); Pattaroni, L [Swiss Federal Institute of Technology (EPFL), Laboratoire de sociologie urbaine (LASUR), Lausanne (Switzerland); Muehll, D von der [Swiss Federal Institute of Technology (EPFL), Laboratoire Choros, Lausanne (Switzerland)

    2007-04-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the second phase of the project in the Bellevaux district of Lausanne. The work done in this second phase is reviewed. The results of phase 1 were followed up in that it was decided to facilitate the renovation of specific buildings where possible. A further aim was to evaluate the extent to which cycling is used as a means of transport as well as to identify possible barriers and solutions to the more widespread use of cycling as a means of transportation. The report describes the work necessary and strategies for specific buildings, including participatory procedures. As far as cycling is concerned, the results of questionnaires are examined and discussed. Communication and animation projects are also looked at.

  18. DNA-thioguanine nucleotide concentration and relapse-free survival during maintenance therapy of childhood acute lymphoblastic leukaemia (NOPHO ALL2008): a prospective substudy of a phase 3 trial.

    Science.gov (United States)

    Nielsen, Stine Nygaard; Grell, Kathrine; Nersting, Jacob; Abrahamsson, Jonas; Lund, Bendik; Kanerva, Jukka; Jónsson, Ólafur Gísli; Vaitkeviciene, Goda; Pruunsild, Kaie; Hjalgrim, Lisa Lyngsie; Schmiegelow, Kjeld

    2017-04-01

    Adjustment of mercaptopurine and methotrexate maintenance therapy of acute lymphoblastic leukaemia by leucocyte count is confounded by natural variations. Cytotoxicity is primarily mediated by DNA-incorporated thioguanine nucleotides (DNA-TGN). The aim of this study was to establish whether DNA-TGN concentrations in blood leucocytes during maintenance therapy are associated with relapse-free survival. In this substudy of the NOPHO ALL2008 phase 3 trial done in 23 hospitals in seven European countries (Denmark, Estonia, Finland, Iceland, Lithuania, Norway, and Sweden), we analysed data from centralised and blinded analyses of 6-mercaptopurine and methotrexate metabolites in blood samples from patients with non-high-risk childhood acute lymphoblastic leukaemia. Eligible patients were aged 1·0-17·9 years; had been diagnosed with non-high-risk precursor B-cell or T-cell leukaemia; had been treated according to the Nordic Society of Pediatric Hematology and Oncology ALL2008 protocol; and had reached maintenance therapy in first remission. Maintenance therapy was (mercaptopurine 75 mg/m 2 once per day and methotrexate 20 mg/m 2 once per week, targeted to a leucocyte count of 1·5-3·0 × 10 9 cells per L). We measured DNA-TGN and erythrocyte concentrations of TGN nucleotides, methylated mercaptopurine metabolites, and methotrexate polyglutamates. The primary objective was the association of DNA-TGN concentrations and 6-mercaptopurine and methotrexate metabolites with relapse-free survival. The secondary endpoint was the assessment of DNA-TGN concentration and 6-mercaptopurine and methotrexate metabolites during maintenance therapy phase 2. Between Nov 26, 2008 and June 14, 2016, 1509 patients from the NOPHO ALL2008 study were assessed for eligibility in the DNA-TGN substudy, of which 918 (89%) of 1026 eligible patients had at least one DNA-TGN measurement and were included in the analyses. Median follow-up was 4·6 years (IQR 3·1-6·1). Relapse-free survival was

  19. X-ray phase radiography and tomography with grating interferometry and the reverse projection technique

    International Nuclear Information System (INIS)

    Wang, Zhili; Gao, Kun; Ge, Xin; Wu, Zhao; Chen, Heng; Wang, Shenghao; Wu, Ziyu; Zhu, Peiping; Yuan, Qingxi; Huang, Wanxia; Zhang, Kai

    2013-01-01

    X-ray grating interferometry provides substantially increased contrast over conventional absorption-based imaging methods, and therefore new and complementary information. Compared with other phase-contrast imaging techniques, x-ray grating interferometry can overcome some of the problems that have impaired the applications of x-ray phase-contrast radiography and phase tomography. Recently, special attention has been paid to the development of quantitative phase retrieval methods, which is mandatory to perform x-ray phase tomography, to achieve material identification, to differentiate distinct tissues, etc. Typically, the phase-stepping approach has been utilized for phase retrieval in grating interferometry. This method requires a grating scanning and acquisition of multiple radiographic projections, and therefore is disadvantageous in terms of imaging speed and radiation damage. Here we present an innovative, highly sensitive approach, dubbed ‘reverse projection’ (RP), for quantitative phase retrieval. Compared with the phase-stepping approach, the present RP method abandons grating scanning completely, and thus is advantageous due to its much higher efficiency and the reduced radiation dose, without the degradation of reconstruction quality. This review presents a detailed explanation of the principle of the RP method. Both radiography and phase tomography experiments are performed to validate the RP method. We believe that this new technique will find widespread applications in biomedical imaging and in vivo studies. (paper)

  20. Engineering systems reliability, safety, and maintenance an integrated approach

    CERN Document Server

    Dhillon, B S

    2017-01-01

    Today, engineering systems are an important element of the world economy and each year billions of dollars are spent to develop, manufacture, operate, and maintain various types of engineering systems around the globe. Many of these systems are highly sophisticated and contain millions of parts. For example, a Boeing jumbo 747 is made up of approximately 4.5 million parts including fasteners. Needless to say, reliability, safety, and maintenance of systems such as this have become more important than ever before.  Global competition and other factors are forcing manufacturers to produce highly reliable, safe, and maintainable engineering products. Therefore, there is a definite need for the reliability, safety, and maintenance professionals to work closely during design and other phases. Engineering Systems Reliability, Safety, and Maintenance: An Integrated Approach eliminates the need to consult many different and diverse sources in the hunt for the information required to design better engineering syste...